Jul 21, 2021 Mobility Committee on 2021-07-21 9:00 AM

July 21, 2021 Mobility Committee

Full Transcript
20694 words Download SRT Download VTT
- Good morning and welcome to this meeting of the Mobility Committee. We have a quorum present and we'll dig right into the agenda. First item for individual consideration is item A, MC21-025, consider approval of the minutes of June 16th, 2021 and June 29th, 2021. I'll entertain a motion. - Motion to approve. - You need to use your mic, Council Member. - Motion to approve. - And we have a second. - I second. - All in favor, aye. - Aye. - Okay, the minutes are approved. And item B, MC21-026, receive a report and hold the discussion regarding City of Denton Transportation/Mobility Project status report. Title of that thing gets longer and longer. Good morning, Mr. Poulster. - Good morning. - All right. Good morning, my name is John Poulster with the Innovative Transportation Solutions and I'll be providing you guys with a update on the city's on-system projects throughout the community. So this sheet shows the dollar amounts of the total of the projects that are construction costs that are being tracked by our firm with the city staff that impact the residents on mostly on-system projects. So those are the dollars that we either have committed to a project from the state or in the feds or we'll get. So the first project is 2181 North-South from essentially 2499 in the South up to Lillian Miller to the North. The construction report is provided on each of these projects that have construction work going on. Right now, 2181 is working mostly with subgrade improvements, pavement, subgrade improvements, and then laying of concrete. We've got some minor utility conflicts that occur as we go through the process. They're just essentially utilities that were not where they were said to be on the plans, but they are not things that are really impacting the schedule of the project. And currently we're still on track for summer of next year to be completed with this project. Your Mayhill 35E project, this project, you note that for those of you who are seeing these reports for the second or third time, the yellow items that have changed from the last time you saw the report. So the schedule has been modified to reflect the completion of the utilities in September of 23, and that was pushed because we had to add about four parcels to this project because we're adding that direct connect ramp on Brinker so that you don't have to stop at the signal. So that pushed the schedule out to September 23. The funding for this project is in place, and we're working with several utilities, everything you see there on that list are all the utilities we're working with to get out of the way essentially for that project so that we can construct it in September of 23. So the interim improvements, we met with TechStat last week, and they are going to use one of their maintenance contracts to essentially, the reason the barrels are still out there is there's two lanes that come up from the frontage road to where Calloways is, but when you get to the intersection, it's a right only, so they're gonna stripe off the hatch stripes so that it narrows it down to one lane before you get to that turn. So that everybody knows it's only one lane now. So as soon as that striping is done, the barrels will be pulled up and it'll be essentially, this interim project will be done. Yes ma'am, that was the improvement, was to put the bollards up and to make it a right turn only, and they were able to get that done quickly to stop the movement, but we need to get the traffic control and the striping done to fit the situation now. And once we get that done, we'll pull the barrels. Okay, the Big Kahuna, I don't know why I keep doing that. So this project is the project from the two merges all the way up to 77. The critical path item on this project are the utilities, and we are working with TechStat on a, I would say bi-weekly basis to coordinate the city's utility issues and DME to make sure that we're, the project is accommodating the utilities and the utilities are working with the project as best we can. And so for example, up there at the Presbyterian Hospital, we're working with DME to, 'cause the transmission line crosses there at Oak, and we're rebuilding that interchange. And so that utility has to move so we can do that interchange. And so we're working with DME, the hospital and the county to coordinate those efforts. So there's an ongoing full court press between the city and the county and the state to make sure that the utilities in this corridor do get completed by the August 23, because that's the critical path item on this project. Again, fully funded, just waiting for the utilities to be acquired. The new right away is essentially completed. There's a couple of parcels that have been negotiated and approved, but we have to wait till the new fiscal year before we can actually pay them, because the state ran out of right away money for this fiscal year. So essentially it's done, but they won't close those documents until October. So good news is 380 improvements was let on July 2nd. Jago Public got it. That's 120 working days. And so technically they have till January 22 to get that. So it's about six months to get all those improvements done, but we think it'll be more closer to December for a substantially complete, which means that they're still working on the contract punch list items, but we're driving on it the way we wanna drive on it. So that should do a lot to solve a lot of the problems in that part of the city. - So December 22, 2022. - Six months, let's do it that way. - Yeah, which six months, okay. - This six months from now till December 21, maybe January 22. - That's great, I appreciate the focus on that. - City, your staff really pushed the issue and also was part of the solution for solving the problem. And so they really need to be appreciative of that 'cause they really didn't get in with their sleeves rolled up to resolve that problem. You bet. - Thank you for the reminder. Would you, for the people that are looking, explain that picture. What is all this red and excellent, I mean, Xs and stripes? - Okay, so what we're showing you there is a snapshot of the northern part of the project. But the project goes from essentially scripture all the way up to 380. But if we showed you the whole drawing, it would be so small you couldn't see any of the details. So to keep it on one page, we're just showing you the intersection. But essentially what you have right now is you enter the freeway north of scripture and you exit the freeway just south of 380, right at the intersection, right? Which we exit right there. What we're doing is flipping that process where we're gonna exit down further south and you're gonna enter where the exit ramp is. And so if you look at the drawing here, that exit ramp is the hatch part where you see that goes from main lanes to the frontage road. That's coming out. That's where the current ramp is now. And then the red line's going from the frontage road to the freeway is the on ramp that we're putting on the project so that you can get on the freeway. And then the red you see on the frontage road just south of that old curve is where we're adding pavement so that when you get to the intersection at the 380 and 35, you'll be able to have a longer right turn bay to transition so you're out of the through traffic. And then we're taking that nose at the end of the frontage road at the intersection. We're taking that out so it'll allow for a dual left, which you currently already have a left and a through left. It'll allow us to have two dual lefts and then two throughs. So that'll also put more traffic through the intersection. So we're improving the intersection to have more capacity. We are flipping the ramps so that you get off further south and all your weaving and merging happens on the frontage road at lower speeds and up on the main lanes. And then we're adding an auxiliary lane on the frontage road because we're taking the off ramp off further south, we're adding another lane so that there'll be three lanes of frontage on the frontage road. And then we're adding an auxiliary lane on the main lanes because right now, when you come up 35W, you've got two lanes that merges over that bridge down to one, it's striped. And then you have to get on the freeway as a single lane. That bridge is built for two lanes. So if we add the auxiliary up through this intersection, then 35W will have two lanes coming up across the bridge and onto the highway. So it gets through that funnel at 35W and it takes all the merge and weave and puts it on the frontage road. - And Mr. Poulster, Council Member Byrd, I just wanted to add that city staff has been working on some graphics that are, you know, a little bit more simplified that help explain kind of what's going on in this area. I realize this is a fairly detailed drawing and John did an excellent job of explaining it, but it is a little bit difficult to understand. And so we are working on that in collaboration with Public Affairs, also TxDOT, and then also our Economic Development Department. And we are going to be posting that information on the website. So there's gonna be additional information that's gonna be available and we'll make sure that y'all are aware of those locations. You know, we did have a meeting last Friday to talk through those specific logistics just to help in that nature. - Thank you very much. I mean, I have one question and me personally, I'm curious about is how does a decision made to create a U-turn versus a non U-turn at a major intersection like that? - So-- - 'Cause I don't believe that intersection has a U-turn. - It does. - Oh, it does, okay. - It does, you just can't get to it because there's no transition or de-cell lane there. It's just, you're waiting in line for your chance to either go left or make the U-turn. - Okay. - So the answer is, is in the past, they would put Texas U-turns where they were warranted. Now, every interchange that the state does has Texas U-turns in them. So as you upgrade a project, they use the new paradigm and they come in with the new Texas use. - Someday you'll explain to me why that's only in Texas. - Well, Texas is, I think, one of the only states, if not the only state that does have frontage roads and that takes one movement out of the intersection if you have the U-turn and if you have frontage roads, you need to separate the turning movements. Most states don't have frontage roads, but that's why Texas has a better economy the most 'cause we have more development. Whether you think that's good or bad, I'm just saying we got it. I've been married a long time. All right, 35 North, this is a project from 377 all the way out to the county line. They are gonna be building it in three segments and they think it's pretty close to what you see on the color scheme. And that only is because they wanna keep the dollar amounts per contract at a certain level because it allows a broader spectrum of contractors to bid on it. And we're moving towards a ready-to-let of December 23 and we're still on track for that. The U35W main lanes, again, we're awaiting environmental clearance. We think we're actually gonna get it this month because all we were actually waiting for is conformity to be approved and what conformity is is there's the Clean Air Act and then there's the National Environmental Protection Act for environmental issues. And what conformity requires is for your transportation plan to conform to the concepts and ideas and visions that are included in NEPA and the Clean Air Act. So for example, in North Texas, we have a 10 county area that's in non-attainment for air quality. And so you have to do certain things. And one of those things you have to do is make sure that whatever transportation system you're putting on the ground in the next 20 years has a budget, an emissions budget below the budget set by Clean Air Act. And so you have to, whenever you add a project to the system, you have to go through this air quality process to determine that the vehicle, the fault organic compounds or VOC emissions are below a certain threshold of so many tons per day. And that whole process is called conformity. So we got conformity approval, which means that at the end of the month, the feds will give us an environmental clearance, which means that it actually doesn't mean anything because if you look on the next page, we've already got the exact same footprint cleared back on June 30th of 2020 for the frontage roads, which is the furthest part out on the project. So we've already got the footprint cleared and they're already acquiring right away. And this may be a good time to stop and note that the Houston folks filed lawsuit against TechStop on what they wanna do for the North Houston Highway Improvement Program in their city and county. So TechStop, being the accommodating folks that they are, decided to take $3 billion back from them and they're gonna reallocate that to other projects in the state 'cause they still have to spend the money. So North Texas is the largest metropolitan area, even larger than Houston. And we've got the most number of projects that are eligible for the criteria that's set for that 3 billion and the frontage road project has been submitted to the commission for consideration of funding in the next 18 months or so. So we're acquiring right away now. If we don't get the full dollar amount, we will work with TechStop Dallas and headquarters to at least get some partial funding on it to do the frontage roads from roughly 407 North to the city of Denton-Wishbone. So these dates are critical for us to continue to hit the March 23 and June 24. Now your US 377 project, this is a project that is under construction with TechStop. We've been doing some work on changeable message signs to really push people to slow down. What was gonna actually help solve the safety issue with the road is when we can get a center temporary barrier up because most of the accidents that have happened out there have been crossover accidents. But what they have to do first is those bridges are only rated for so much weight. And even if you put a barrel out there, the barrel is filled with water and it has a weight capacity to it. So they're under pinning the bridge structure as we speak, evaluating which columns need to be shored up. And once they get certified, that it can carry the additional weight, they'll put a center barrier throughout the corridor to preclude the crossover issues, which should go a long way to solving the problem we have right now, which the ultimate project will solve because it'll have a raised median. And everything I just said is in there on the report. You can. - When they put the barrier up, the temporary barrier, is it just gonna be in certain locations or is this gonna expand the whole? - Well, it will essentially cover the limits of the project with the exception of where you have cross streets that have to cross over and turn left. So it'll be mostly continuous. - And that's gonna be that low concrete wall type barrier? - It could either be the low concrete ones or those orange, they're the same shape, they're made out of plastic filled with water. Both of them do the same thing. It's just one's a little bit lighter. - Thank you. - So then your 380 East project further on, for those of you that drive that way, we've been told by TechStot to go ahead, if you remember our last report where it says the let date, it was an asterisk because we weren't sure. What TechStot's decided to do, they've got the certifications from all of these utilities here that they will have the utilities completed by December of this year. But when they looked at where the utilities are working versus where the contract can work, there's significant portions of the road where the contract can work where the utilities are already relocated. So they're gonna let the project in August with special notes, special provisions saying you can work in these from station to station. So when they bid it, they're bidding it knowing that they can't work in these areas before December so we'll get comparable bids. So it will go in August, which means that September, October, late September, early October, the contractor has about 60 days to mobilize. You'll be seeing work out there anyway because the utilities will be out there but the contractor themselves should be out there sometime in the October, November timeframe. And this project adds, just like the previous one does, additional lanes. So currently you have a four-lane with a flush median and the project that's under construction out here, you got four lanes with flush median. When we're done, you'll have six lanes with a raised median and you'll have grade separations at NAVO, TEAL, Legacy, 423 and 720. So it'll act like a semi-freeway. Okay, so feasibility study for 380, they are gonna be coming out saying that 380 needs to be a freeway but they're not gonna finish the report till the fall. And again, the reason they're not finishing the report till fall, 'cause they're already done, is they ran out of develop authority until the next fiscal year, which starts September 1st. So HDR has to wait until they get a second notice to proceed to do the final public meeting just from a financial standpoint. They'll close it out and we're already, the city and the county, we're already working with TechStat to begin the environmental clearance right now on a freeway 'cause it's already needed. Luke 288. So Denton County will be putting the contract for Chang, Patel and Yerby on their court agenda for July 27th. That's a little over $5 million for the plan specifications and estimates. The project is environmentally cleared. They're acquiring right away and we will be designing the project and this is another because it's a loop. It's eligible for both clear lanes and because we're environmentally cleared and we're acquiring right away and we're starting design, it's also eligible for being submitted as a candidate project for that $3 billion. So right now we've got very little funding allocated to the project but this is a project that is critical for both city of Denton and the county. TechStat was one that asked us to revive it because it's part of the future outer loop and then the region because it's part of the outer loop. - Excuse me, John, if you don't mind going back one. When you say it needs to be a freeway, which I would agree is eminently true, what does that physically mean to you when you say it needs to be a freeway? Elevated? - Yeah, so what happens is it's not necessarily elevated, although parts of it will be. It's that it's controlled access. So you have frontage roads. So you have frontage roads and grade separations and free flow main lanes. And to put this in perspective, I think the average daily traffic out there is a little over 70,000 cars and 55,000 or more, you get to where you should be in a freeway scenario and 12 years, 15 years from now, it's pushed to be like 90,000. So even that's after we plug in the outer loop as a limited access facility or freeway. So that traffic that's gonna come from the fact that we're building the toll road right now to Grayson County, it's under construction, that traffic is gonna come south. And if the outer loop is there, they'll take that in west because it's a quicker move around the corner. But if that's, even with that there, 380 goes to 90,000 in 2035 or something like that. - But controlled access is the core thought and frontage roads, but then when you say great separation. - That's a bridge over. So when you pull up to 423 coming out of Frisco, you go north, when you hit 380, 380 is gonna go over, you'll go under-- - Overpasses and underpasses. - Over and underpasses. - Got it, great explanation, thank you. - I'll take the two great separations in the appendix glossary. So in that note, Loop 288 is proposed as a actual physical controlled access facility. So it'll have frontage roads and freeway main lanes and great overpasses and underpasses at the cross streets. So again, we've already, today's the 21st, so yes, it is, right? Okay, so yesterday, Commissioners Court approved the LTRA design packet for doing the design on this project as well. It was about just under two million bucks and we are working with city staff to make sure again, because this is primarily a road that impacts all of the industrial area in that area, that we'll coordinate with the city to make sure that what we design is what the city wants to see happen. 1173, so right now we're awaiting environmental clearance and we're also, it was part of conformity and we were told last Friday that it will be cleared because it has received conformity, so 1173 will be cleared this month as well. There is negotiations and conversations between the county and TechStock on who picks up the next phase of the project where on the design and at some point, well, the county's decided they're gonna go out for a bond program next November and we're already working with city staff to coordinate your efforts on that and probably this will be one of those projects that you see on the bond program where the county goes ahead and moves forward with all of the design documents, the 10% right away match and then any construction dollars that TechStock says they may need on the project. So this is gonna become fairly more active fairly quickly. Okay, so Alma Locus and I'm gonna be out of my depth real fast on this, but essentially we've been working, I know that's not surprising to anybody. We've been working with TechStock on how to deal with Alma Locus for years and we think we have a tentative agreement. City's gone in from the courthouse south and all those improvements and the road is in a certain degree of state of disrepair that we were talking about on Friday that TechStock needs to find a quick remedy to get that pavement back to a navigable surface in the interim, but ultimately to reconstruct it and at that point, TechStock inquires to the city's desire to take Alma Locus off system and the thinking is if you take it off system after they fix it, right, where it's a real road again, that you'll be able to use the road as you see fit and make it into your own image as opposed to something that TechStock says you can and can't do. So I don't know how much I butchered that, but I'm looking for salvation. - Well, I'd like to understand why there's discussion of two steps, you know, making it quickly navigable and reconstructing it. Why are we just doing it? I think that'll be really confusing to people. Like they fix it and then they tore it up again. That's the thing that makes people laugh. - What we're talking about is the milling overlay so that you're not looking like you're in the Kosovo, right? So we just wanna get at something that's drivable, that's quick and easy because the reconstruct where you come in and you do the subgrade improvements and you put the road back so that it lasts a long time so that if you do take it, you're getting a quality product as opposed to something with paint on it, essentially. - What's the time interval between milling overlay and just reconstructing it again? - A long time for people. It's a minute for TechStock, but it's a long time for humans. I'm still looking for help. - No, you're fine, I was waiting for you to be finished. Mayor Pro Temelter, I just mentioned that this is something that we are actively working on with TechStock. Our concern is we are gonna be completed with all of our project in the very near future and that is the water and sewer and storm drain improvements basically from the courthouse south, as John mentioned. And I think our concern is that that road has been patched so that it still has a drivable surface. And some of the discussion, and this is a constant conversation that we're having at this time, is previous staff have looked into taking this roadway infrastructure over at such time that is repaired and reconstructed to a standard of which we feel like we're comfortable with taking over. A milling overlay would be something that would be an interim step that could be completed maybe through a maintenance contract with TechStock versus a full reconstruct which would have to actually be bid and a process would have to go through. - And designed. - And designed. And so there may be this interim step simply from the standpoint that the city is not interested in taking over the roadway permanently until it's reconstructed to the standard of which we are willing to accept. So I think the purpose of the mill and overlay is simply from the standpoint that currently that roadway infrastructure is not designed and also not a programmed project that they currently have that they're working through. So those are interim conversations that we've been having over the last few weeks. TechStock's committed to working with us to come up with a plan. And so I would say that that mill and overlay that John mentioned is just simply from the standpoint that we don't want there to be a large gap of time in between the time that the utilities and the storm drain is completed until they can actually come in and do that reconstruction. So-- - Forgive me, I'm a bit baffled 'cause it's gotta be a good year ago or more that council voted to take those over when it was put in condition to be worthy of being taken over. So why isn't it being bid now so that after utilities, the reconstruct happens? I don't understand the gap. - Well, I'm gonna answer that 'cause I don't want her to answer that. What happened at TechStock is they have turnover there as all organizations do. And the people that are there now did not get communicated properly with. But the intent was we come along right behind them. So somewhere along the way that, and I'm gonna take responsibility for that. Somewhere along the way when the transition of staff at TechStock occurred, that communication didn't get made. And when we were talking to the folks that we think they're gonna start showing a really good focus for city of Denton, with the folks that got there now are there long-term and they're very capable. We essentially started that conversation on Friday. So I'm gonna call that on me. - Yeah, I appreciate you owning that. That's, I guess I'd ask you offline to think about it. How could I possibly avoid the future? That's a big miss. - Yes, sir. But the mill and overlay is simply, they came in with a machine, they mill it flat, get it as smooth as possible without impacting any of the substructures. And then they come in with a two-inch overlay. And that's like a coat of paint. And that will last about as long as it takes us to get the other project designed and bid and awarded. So we'd have to do that anyway. But if the city wanted to just take it over after that, I would fight you hammer and tongue 'cause the substructure's not good. - Yeah, we wanna make sure that when we take that infrastructure over that it's to the standard of which we believe it should be. And that will be part of the MOU. My understanding that all of the MOU, and I wasn't in this position at that time, but the MOU that has been processed and has been evaluated was not completed. And so we still need to bring that back to council. We're looking at bringing that back in pieces. And this is one of the projects that is highest of interest of staff, simply because we see the improvements that have been made south of the courthouse, but it's also very much on our radar. And the reason why you also see it on this graphic and why John's included in the report is now we want to come up with the plan. And like he mentioned, the new area engineer and his team, we are having monthly meetings with, and sometimes we're even talking weekly or daily on different things that are happening throughout the city, but we want to come up with the plan also to execute from now the courthouse north to 380 in a more succinct manner that's more of a programmatic matter. So I would say that at this point, we are looking for measures to make improvements to the roadway on that temporary or interim basis before that complete project can be reconstructed to the standard of which the city would then be interested in accepting it. - Yeah, I've said what I needed to say about it. Any other comments? Okay. - Sorry. Fortunately for me, I think I'm done. Any questions? - Any questions? - Got a question. Would you please explain this, still on Elm and Locust phase two, it was so much going on with that conversation. For this red line, what does this mean to the people? - So this was a conversation we had on Friday, and I told my staff, hey, we need to get it in the report so we can talk about it, throw something in there so we can have a conversation. So this will be upgraded to a far better graphic and details the next time you see it. But essentially, the city's doing the work in phases. Courthouse south is essentially fixing to be done. Courthouse north has some challenges from a financial standpoint that we need to discuss, and we're gonna coordinate and memorialize with text what Ms. Devaney was saying in a more programmatic manner so that we do the northern part better than the southern part. - And the same thing that's happening in the southern part that's going to happen in the northern part, but it's gonna be-- - Better, better. - Yes, yes, ma'am. - Is that, you can't expand that world all the way out. - Well, I mean-- - The utilities need to be-- - There's not a lot of right of way there. It's very tight, which is why I think the city would be better off having control of it because you don't have to follow state standards. You just have to follow AASHTO or your own city standards, and you can make it more of a origin destination route as opposed to a state facility. - Yeah, and I would just mention that the same utility improvements that were made south of the courthouse need to be made north of the courthouse, so that's water, wastewater, and drainage infrastructure. As Mr. Polster mentioned, there are funding gaps, and I know you've seen this in some of our CIP presentations where we are looking for drainage funding for that portion of the project, and we're working with TxDOT on some creative ideas to help solve some of those issues. And then ultimately, that roadway being built to the standard of which the city would then be able to accept it from that standpoint. I would like to mention also that it's very interesting, and we run into this many times. There are six TxDOT roadways throughout the city of Denton that are TxDOT responsibility and maintenance, and we also have some maintenance agreements that we're gonna be working through with them in the near future. They showed us a preview of that last Thursday. I say that to tell you that typically on TxDOT roadways, utility infrastructure is not allowed underneath the main lanes, and so that's another very interesting reason as to why it would be in the city's best interest to take over these roadways once the infrastructure is completed and reconstructed to the standard of which we would accept. And really, that boils into on normal, and I say normal in quotes, but standard TxDOT projects would be that utilities would be located either in the utility accommodation zone, which typically is the last three to 10 feet on the outside of the right away, or in a private easement that is purchased by the city of Denton for those utility infrastructure. So this is a little bit different standard, and so I think that's another major reason why it's in the city's best interest to look at. I'm taking over this from the infrastructure standpoint with the needs of the water and wastewater in this area. - Closer in and around the courthouse, back of curb is sidewalk. Back of sidewalk is building all the time, so everything has to be under the pavement, and that's something that we've had to, it's always been a pain whenever we wanna do utility improvements on Locust and Elm because it's under pavement of a state facility, and you gotta take it all the way to Austin and back every time. - I have one last thing I just wanted to mention. I know Council Member Byrd, you asked specifically about the red lines. Some of that area is very interesting. One of the things that we are working on educating residents about really is that portion of EGLE that's on the left graph, that's the very last line that you see that's running east-west, that portion of EGLE between Elm and Locust is actually textile maintained. So some of those things are things that we're working through because that also is in a similar state of disrepair. I know they've done some recent potholes, but that's part of the outreach. This not only impacts the city infrastructure, but then I would say even from winter weather, who's going to provide the snow and ice maintenance measures, whether it's sanding or putting out the chemical that they do to help with the ice. So these are some things that we see that are on our radar that we also are working with the streets department on. So I mentioned that just to say that, from a resident standpoint, you're driving Donegal, you assume it's a city roadway, but it's actually maintained by Text-dot in that area. So those are some of the things that we're working to kind of coordinate with Text-dot on it and per se clean up to make sure that those roadways are built to the city specifications and standards. - Thank you. - No problem. - Do I stop, oh, go ahead. - Oh, okay, so I shared this thought with Ms. Devaney and Ms. Wood in our meeting last week. Sorry if this is a harebrained idea, but I just want to throw it out there while the 35 project is in the design phase, or before the design phase, whatever it is. So I love the overpass, the bridge across 35E at North Texas Boulevard. I would love to see the other overpasses that are being built have a similar kind of design. I know that there's one that's gonna go from Windsor. And in the interest of improved connectivity, especially for pedestrians and cyclists, I would love to see a similar overpass at Scripture and 35. - We can look at the approved, 'cause the environmental schematic's already done, so we can look to see what's there. The North Texas Boulevard and similar, as you go down through Lewisville, we see those aesthetic improvements. There's a certain threshold that Text-dot will include naturally in a project, and we had to, the cities along the corridor had to agree to a palette of colors and standardized form liners, and they could be emphasis areas. So you have, Denton has North Texas as the green color mixed in. Lewisville had the lake with the blue, and we had further south, Old Town area, Carrollton had a kind of a brown type palette, so we have a palette that we're gonna be working aesthetically with on this project. But then when it comes to like those medallions that are at North Texas Boulevard, back then, the city staff came to the aesthetic conversation a little bit later than Lewisville did. Lewisville was early on, so we had to redesign some stuff for that wall to be wired and structured so it can hold that 18-foot medallion. - So I guess I should clarify, the aesthetics are very nice, but what I mean is that it's very pedestrian-friendly. - Okay, so the bridge deck, again, everything that was done to North Texas Boulevard was a negotiation between the city staff, the city and Text-dot and the county, and whatever the county could press the state to include from an infrastructure standpoint or a structural standpoint, we did that from the county standpoint, and then the city came in and would partner with the color patterns, the separated pedestrian facilities, all that was negotiated, and if there was anything that had to be above and beyond at the time, the city paid for the Delta. So we're doing that for all of the other projects on the ultimate as well, so I would say you're right. It's not a crazy idea. Now's the time while we're designing the project because we can incorporate fractured fin, if you want. We can do certain types of aesthetic form liners that you want, and if you want to do specific form liners, as long as you keep it to a minimum of, say, five or six different form liners for, so Louisville had to pay for half the form liners for all those fish and boats and whatever because there was a certain number of form liners that the contractor was gonna have to use anyway just for the fractured fin format, so they work it out on a negotiation, and then they incorporate that into the design so the contractor will build it when they're building the facility as opposed to after the fact, which is what the medallions were. The up part was negotiated early on, but everything, I think the question was asked once before. There are places in the interim project now where there are sidewalks on 35, and there are places where there aren't, and the answer is the places where they are, we've done something to the road. Those places where we have it because that's a new paradigm didn't. What we're doing from the merge north is all new construction, and I think, I'm remembering, I could have a dream, but I think Tech Start's saying right now it stops short, just short of North Texas Boulevard, that I think the district wants to go ahead and extend that 35E leg to pick up North Texas Boulevard, to widen that structure, right, and we get a second shot at making the bottom look as good as the top. - And I would just mention to Council Member McGuire and the Parks Department is looking at the different aesthetics from medallions, different types of forms, and so that's something that we're coordinating with Tech Start. It's not at the local office, it's actually at the Dallas District Office, and some of those things they may even be bringing forward to the Public Art Committee, and so that is a constant conversation. I think what I heard you say, and I just wanna confirm specifically, and I know this was what we talked about in our meeting on Friday, is that you're looking at some type of bridge or structure that could possibly be constructed where Scripture would actually go over 35 and connect to the west near the Jim Crystal area. - Possibly, yes, and I know that there, you know, there were some questions about whether it would be feasible to extend Jim Crystal Road to meet Scripture. You know, in the absence of that, if that turns out to not be feasible, I would also love to just see Scripture go across, have a nice sort of pedestrian-friendly intersection there where folks could access the frontage road on the west side of 35 as well. - So I'm expendable, that's why I'm here, but if there's not a bridge structure already included in the project, I have to crush your hopes horribly right now 'cause they won't add it. It's too far along. So I don't know what's in it. If there's a structure there, we can make it as appealing as you want, but if there's not one there now, which now I'm starting to remember, I don't think there is because we're doing a braided ramp in that location, northbound at least. So all these things we're doing on interim improvements there all get pulled out because the ultimate has the on-ramp and the off-ramp in the exact same location and the ultimate, which is if you go down to Western Center Boulevard, down towards Fort Worth on 35W, where you see those big giant exit and entrance at the same place, it's called a braided ramp, that's what you'll have at least on the northbound side of 35 in that area. - Okay, so the off-ramp is gonna be to the south of scripture from 35 North? - The interim or the ultimate, interim or ultimate? - Ultimate. - North. - Okay. - So essentially between scripture and 380, almost dead center there is where the braid will be so that you'll exit the main lanes and go straight to 380. And if you're on the frontage road south of there, you'll enter the freeway right there. And I'm not, I can't remember 'cause I think we flipped the stack, whether the exit is that grade or the entrance is that grade. It's typically the exits that grade because you want those people on the ground as quickly as possible so they can turn into the development. But I don't know off the top of my head. - Okay, all right. - With all that's on the website, keepitmovingdallas.com, you can go look at it or we can go run it to ground for you. - Okay, yes, I appreciate you clarifying that. I totally understand if a bridge at scripture is, if it's too late in the process to add something like that, I just thought I'd throw it out. - I think there's a really helpful thing to be aware of for us that when bridges are planned, we can talk about having pedestrian faculties on them. If only we had a bike pad ADA coordinator to be on the lookout for things like that. - That's right. - Maybe we'll talk about that later in the meeting. - Danielle, you still have one of those? - Wish they started Monday. I think they, our ADA person started on yesterday for the first time. - He's sitting in the front row. - Oh, is he? There he is. I had a question about, oh, I'm a pioneer woman, Texas Women's University alum, and I seem like Texas Women's University should be represented somewhere along the corridor of I-35 as it is a major employer and user of the city. Can we speak to those folks or bring that in as part of the new process? It's front door is on 380. - We are actually already in the works with that. The Parks Department is already looking at ways to incorporate possibly something from TW and also something to show when you're coming from the Oklahoma area into town that you're entering Denton. So those types of conversations are in the works with our Parks Department currently. No problem. - So unlike I was taught in kindergarten, I'm gonna stop sharing, right? - So we're good, we're all done? Yep. Okay, thank you very much. Let's move on now to item C, MC21-027. I never used to read the numbers, but the mayor does it, so I'll do it too. Receive a report and hold the discussion regarding updates from the Denton County Transportation Authority. Nicole, hi, Nicole. - Good morning. - Can everyone hear me okay? - Sorry? - Can everyone hear me okay? - Oh, yes. - Yes. Ish? - Yeah. - Okay, well, I'm Nicole Recker. I'm the VP of Mobility Services and Administration at DCTA. And I also have with me Christina Holcomb, who is DCTA's Deputy CEO. City staff asked that we present about our trip program. So Christina is gonna cover off on that and answer any questions. And then I just have just a couple updates to share. I will let the committee know that we do have another pending meeting at 10 a.m. that both Christina and I are in. And so we will do our best to answer any questions, but we might have some scheduling conflicts. And so with that, I'll go ahead and share my screen. And then Christina can begin. - Thank you, Nicole. Good morning. I wanted to provide a very brief overview of the Transportation Reinvestment Program per staff's request. The TRIP program is a new program to DCTA and is a new version of a former program we used to have, which was called ELAP. Next slide, please. Just to give a brief overview of what TRIP is all about, it's really focused on providing funding to the cities to implement projects which are consistent with the DCTA's long-range service plan. We do have a long-range service plan from 2012. You can see the key objectives for that plan on the screen. So any project that the city might have that meets these goals, it is something that DCTA may be able to assist with funding. Kind of go back a little bit, just a very high-level education as just to confirm that you are aware that DCTA operates off of half-cent sales tax from each of our member cities. So city of Denton, we get a half-cent sales tax, and that is what is used to operate and maintain DCTA assets, fleet, and operations. So in a way to partner with our member cities, we take a portion of that money and provide that in partnership to the city to execute projects that, again, might meet these goals and objectives. Next page, please. So in looking at the funding, how it is determined, how much that funding is, is the annual TRIP budget is based on 15% of DCTA's net available cash from the previous fiscal year. And I will say, sometimes we think we know what the final tax receipts are in a year, but then there's always a true up at the end of the year. So we have found in this first year of having this TRIP program that we have had to make some adjustments along the way on the total final amount. And I'll show you what those numbers look like. For this initial year, which was this past year, FY21, we did infuse, the board wanted to infuse an extra $2 million on top of the 15% net available cash into this first year of TRIP projects. Then we take out 5% of the overall budget to allocate towards DCTA's program administration. So we have had to use one of our on-call engineering firms to assist us in administering this program. We guessed at 5%, we weren't really sure exactly how much we might need for the administration portion. Again, first year, so this policy is expected to be updated for the next year. So when you look at the different member city allocations, we have three member cities, Denton, Louisville, and Highland Village, all collect and administer different levels of sales tax, right? It's all a half cent, but clearly the bigger the city, the bigger the sales tax contribution. So the formulas on the screen about how we determine how much each member city will get out of that bucket of dollars. Any dollars that are not spent by a city at the end of the fiscal year may roll over to the next fiscal year for three years. So that way, if you have a bigger project you know is coming up in FY23, you don't have to spend as much in FY21 and FY22 because you can roll it over and kind of save up your, make your bank bigger for the FY23 projects that you might have slated. Again, that last bullet, I do anticipate that the board will be amending the trip policy based on this first year of programming. Some of the timing didn't quite work out right, so we will work through some of those amendments. Next page, please. So we do have an annual call for projects. So how a city will seek funding from DCTA is in January, we announced that we'll have an annual call for projects. We have an application that city staff completes for us. Then they submit it within about 90 days. Staff reviews that information, confirms that all of the requested projects for funding meet the goals and objectives of the Long Range Service Plan that the agency has. And then we take those projects to the board. So this, we actually just, for this fiscal year, the first year of trip, we took all of the call for projects that were submitted to the board this past month in June. And the board reviews those projects and then they approve them for project funding. And it is a reimbursement basis. So the city will basically go through, execute their project. Our staff and consultants will check in from time to time to ensure that all of the processes are being followed that are outlined in the policy. And then, so in June, the board did approve projects. So on the next page, let's talk a little bit about eligibility and selection. As I mentioned, it must meet Long Range Service goals, must be financially sound. We do have a policy that your staff should have that they can look through and probably share a copy of it with you to get the nitty-gritty. But since we're on a time restriction, I won't go into this in much more detail. Next page. So let's talk dollars. For FY21, the total allocation to the trip program for distribution to the three member cities was 7.7 million. Now, I will say that is more than the 15% budget allocation but the net available fund balance because this first year, the board wanted to infuse that extra $2 million. So the total came to 7.7 million. Denton's portion is 3.4 million. When we had the anal proffer projects, that number was not that high because we had to make some adjustments. Again, the final sales tax dollars did not come in. So the total amount ended up being 3.4. Now that we've already completed the anal proffer projects, the city of Denton does have an extra $900,000, so almost a million dollars to use this year if there are additional projects that the city has that meet those goals and objectives. So kind of next steps, those will roll over into the next fiscal year and be added to the ones that will be added for the FY22 budget. To give you an idea of what we're looking at for FY22, again, just an estimate 'cause we are currently in the budgeting process but the proposed budget that will be presented to the board does include 7.1 million for trip projects for the three member cities. So very similar to what you received in FY21, a little bit less, but then you also have this extra almost a million dollars to add to your pot for FY22. I said that really quick. I'm sure there are questions. I can maybe answer a couple or if you want to email those to me, maybe we can respond. That way it gives Nicole the opportunity to answer your questions regarding the GoZone service or whatever questions you have for her before we have to jump off in less than 60 seconds. - You're right on 10 o'clock. Anything real quick? - And this is the list of projects that your staff did submit to DCTA and these are the ones that were funded and the amount that they requested for those particular projects are listed. So it really is a great partnership. Clearly crosswalks and sidewalks benefit transit travel and then the bike path. So these were excellent projects and very well aligned with our longway service plan. - This isn't a question, but I would just like to thank Nicole for her service to DCTA these last few years. I know that she's moving on to other opportunities and Nicole, I just want to wish you the best of luck. - I didn't catch that. Nicole's-- - Thank you. That's actually one of my announcements today. - Oh, wow, I don't know how-- - Sorry to steal your thunder. - Councilmember McGuire has the secret source of news. - Yeah, I know. - Wow, yeah, let me add my good wishes to you. - Same here, Nicole, thank you. - Just quickly on this, on the trip projects, just not generally, even if you have to drop off, I'm kind of more speaking to any of the general public listening. Unlike most things we do, DCTA is not funded based on figuring out what the needs are and then developing a budget and funding that. It's funded based on just what the sales tax revenue is. So whether the ridership is going up or going down, it's just, it's not responsive to that. So the fact that this program helps bring some of that money that isn't going into literally mass transit, back into the community in a related way, I think is very smart and much appreciated. - Well, and I would say that if you have any questions about the trip program, like Christina mentioned, feel free to email those over to me. We can make sure that we get those answered and submitted back to the committee. I know Christina has to jump off. I'll show up fashionably late to the meeting, Christina. - I'll cover for you while you're gone. - Thank you all. I did want to update the committee just on some progress on the GoZone proposal that is going to the DCTA board tomorrow. - We were talking about that just recently. We were talking about that just recently. - You might've heard. - I've slept since then, yes. Yeah, so we are expecting the resolution from the city of Denton and we will forward that to our board of directors prior to tomorrow's meeting. But the board will be considering approval on a variety of items related to GoZone. So I'm sure that we will submit a written update to city staff after the Thursday meeting just to kind of keep everyone on the same page. And so just thank you again for your continued conversation about GoZone and your feedback. I know I speak on behalf of staff. We have found it extremely helpful to have, you know, kind of a vibrant conversation about some of these changes for the community and we'll certainly be in touch after our board has some lengthy discussion and makes a decision about next steps regarding any sort of service modification. And then I did just wanna let the committee know that my last day at DCTA will be August 4th. I have served a very happy seven years at DCTA and although I am sad to leave, I am sure that DCTA has such amazing things ahead of it. And I just wanted to thank the committee for providing DCTA with a platform to talk about, you know, our services and our programs and our projects during my tenure here at DCTA. And I will certainly make sure that, you know, you have a representative who will still come and attend monthly. So hopefully you will not go without any representation, but I just wanted to personally thank each one of you for being invested in transportation for the city of Denton and providing your feedback. I have found it extremely educational and I've really enjoyed my time working with this committee. - Well, you have been just a crackerjack representative for DCTA to us and I really appreciate your preparation and your clarity and you're leaving big shoes to fill. And you can only do well in what you do next, I fully expect. I have just related back to GoZone. I'll just, if I may, I want to underscore some things that might not be obvious from just the headline that if you take into account the full conversation and the full proceedings that actually all seven members of council voted in some form or another for an extended parallel test to optimize the mix. All seven members voted at one point or another for consideration of elimination affairs and evaluation of that opportunity. All seven members voted at one point or another for consideration of right sizing the fleet in terms of the vehicles themselves on the fixed routes and a super majority did vote for some form of keeping the workforce whole. So I hope that helps the discussion, knowing kind of what council has expressed. Other comments? We're good? Okay, thank you. - Oh, I do have a question. - Thank you. - Please. - All right, I do. - I do have a question. She mentioned something about the funds being rolled over into the next year for three years. - Yes. - And what my question in my head was, well, what would make a city not use the funds for three years? What kind of circumstance would an area have to be under to not to take advantage of using those funds? And then what happens to those funds after three years? Are they dispersed to other cities to use? Tell me a little bit about that. - Sure. So the purpose, and there's really two main purposes in allowing the funds to roll over. So the first purpose would be much like Christina showed on that slide, that the city submits a number of projects, they're approved, but they don't spend the total allocation for the year. And so you have a bit of a fund balance that then you can roll. The second purpose would be that if the city had the intent of submitting a project that required more funding and was available for one singular fiscal year, and they decided to roll a portion or that entire funding over to the following year to basically combine annual funds so that they would have enough money for the project. So it provides the city with just a little bit more flexibility as to how they want to submit for projects. They can do many low dollar projects, or they could do something that's much larger and requires more funding. And it just gives the city flexibility to use that funding based on their needs. After the three-year period of time, the fund balance then just rolls back down to our cash bottom line. And so it would be represented in the following fiscal year, that 15% of overall cash balance at the end of the fiscal year, it would be represented there. And so it's highly possible that the city would just get a slightly increased portion because that balance has rolled down to the cash. - What, when does, tell me again, when are these decisions made as to how to use those funds? When does that come up? - So we do an annual call for projects. This year, the annual call for projects was in April, and then reviewed by our board in May, and then approved in June. So there's an annual call for projects, and then we work with city staff to let them know that timing, and then city staff has their own internal process for determining what projects are submitted. - And if I may, Mr. Chair, we will certainly make a commitment to not run into the issue of leaving funds available for other cities to potentially be able to avail themselves to. So we will be bringing back very soon a plan for that additional roughly $900,000. That was great news for us whenever we found it out. We've actually got a couple of projects that, the numbers actually work out really well, projects that we've already submitted for the first round of trip to fund the design. It will help bridge the gap that we needed for construction dollars as well. So we'll be bringing that back at a future mobility committee meeting, and then we're strategizing right now, and we're delighted to have our new senior transportation planner on board. But what does that process for vetting potential projects for the 2022 cycle look like? - I'll just let you know right now, what we're looking at primarily focusing in on is the gap sidewalks in front of schools. And so this is gonna be a great way to augment that $12 million that we had approved as part of the 2019 bond, to fully fund those Safe Routes to School projects, where unfortunately we haven't gotten some of the text dot dollars that we've gotten in the past to fund that program. So we will be coming back to you within the next couple of months, talking about our strategy, talking about the vetting process for potential projects. And we do plan on having our application ready to go in January, which is the same timing that we had last year. City Council, once we've got the list vetted through this committee and Traffic Safety Commission, then City Council will adopt a resolution endorsing the application. And so we wanna make sure as soon as April comes, we've got that resolution approved, and we're ready to submit our application to DCTA. - Great, thank you. Anything else? You look like you have something you wanna say, no? - That's just my face. - Okay. - That's perfectly acceptable face. So, okay. Thank you so much, Nicole. We'll miss you. - Thank you. - Moving on. Let's open item D, MC21-028. Receive a report and hold the discussion regarding the City of Denton's proposed expenditure funds in the amount of $70,553 to TxDOT's Highway Improvement Safety Program. - Good morning, everyone. I'm Chandra with Traffic Engineering. I'm here to provide an overview of HSIP program, which is short and form for Highway Safety Improvement Program. HSIP is an annual textile program to improve safety of intersections or corridors along roadways in the City of Denton or statewide highways in Texas. The project selection criteria is based on mostly the fatal or serious injuries in highways. There are two categories on projects awarded is based on on-system and off-system. On-system are the TxDOT roadways that has owned or maintained by city and county-owned roadways. In case of on-system roadways, TxDOT pays for 100% of the construction cost and city is up for design, review fees, and any additional overages at the time of construction. Off-system projects are slightly different in the way of the dollar amount. TxDOT pays for 90% of the construction and city pays for 10% matching funds for construction, as well as design, overages, and any review fees from TxDOT. In this project, we have three locations. One is, as you see on the map, the north arrow is to the left, Kingsrow at Loop 288, Loop 288 at 380 interchange, and McKinney at Loop 288. This project was submitted back in 2018 with an estimate funds for improving the signal heads that was 20 years or older. For pedestrian access, putting in all the new controller cabinets, battery backups, adding signage, and also increasing intersection stripings. The location at Loop 288 in Kingsrow is to modernize mainly the traffic signal. Permanent fixtures, right now it's on a mast arm, so they will change it out to put in from the span wire to mast arm with luminaries, also controller cabinet and communication equipment with the latest technologies to optimize efficiency and safety at the intersection. This will also improve pedestrian crossings, which is not available right now, and they will deploy radar and all the grid smarts cameras to monitor activities so we can improve functions remotely. Similarly, at Loop 288 at 380, the intersection and the controllers were pretty old, so they are upgrading all the communication equipments, changing the lightings to LEDs, and also the latest cameras that we can control remotely. At Loop 288 at McKinney, it's similar, we are upgrading all the controllers and detection equipments so we can optimize and monitor remotely. At the time back, the previous staff submitted the initial estimate based on 2018 dollars. It was costing a little more than, a little less than 700,000 based on TechStat's 100% construction cost. Citi was up for a little less than $30,000 for TechStat plan reviews, and in the process between 2018 and '19, we hired Lee Engineering as a designer for the three intersections at a cost of $88,250 for design, and when we completed the design and submitted for TechStat for bidding, the actual bid results came out to be around approximately $768,000, and since Citi will have to match any overage costs from the initial estimate in 2018 to 2021, we are on the hook for $70,000. When we submitted the project, we were on hook for 17% of the total cost of the entire project, and with the additional overage of $70,000, it's mainly, we are on right now at 25%, we're still getting one to three dollars. For one Citi dollar, we are getting three TechStat dollars spent on the Citi Road base, and the additional $70,000 is mainly accounted for in the inflation as well as the project scope. Right now at King's Row at 288, there is no pedestrian crossing across the loop, so with this project, they will be adding crosswalks, and also with the new equipments, they will be able to control the intersection efficiently that will enable the delays on King's Road to be optimized, and we can minimize the delays. Also, at the same time, provide safe crossing for pedestrians on either side of loop 288. With this project, we're still getting good bucks spent on Citi dollars, even with spending the additional $70,000 that came out of the bid results in May of 2021. With that, if you have any questions. - Councilmember McGuire, you look like you have something to say. - Oh, sorry, what? - I said, you look like you have something to say. - I do have something to say. So you sort of alluded to this in your mention of the traffic congestion at King's Row and 288. Did you see the video that a citizen showed last night at the council meeting of that intersection? Okay, just want to make sure that you were aware of that footage and sort of taking that particular issue into account. It sounds like you are, but. - Yes. - Councilmember Byrd. - Yes, I have a question about the loop 288 in King's Row area. Am I, let me see, let me phrase this because what I have in my head is, what is a mast arm? - It's the signal indication that's on a cantilever arm, the permanent structures. - Just kind of leaning over like that? - Yes. - That's a mast arm? - Yes. - Versus the little line that goes across with the? - Yes, it's on a wire, currently it's on span wire, so if there is a wind or any hail or any kind of environmental forces, those kind of like literally move, but with mast arms, it's literally, you can see in one place. - You know, 288 is a very fast-- - That's right. - Roadway, and in my mind right now, I just can't imagine having a crosswalk, you know, across that roadway. I've seen people run the light there on that roadway, and maybe you don't have anything to do with this part, this may have been for the question for the other gentlemen about an additional, I guess they're gonna be widening that roadway, they're gonna be doing something there, where those cars, to which you alluded to, can, they run out into the roadway, I mean, they run out into literally on 288 to wait their turn. - Currently, currently they are all backed up with the delays, because one is the capacity issue on 288, and the school traffic that we are aware of from 2019 that it's backing up onto the freeway. With this project, we could add more timings to the cross street, which is Kingsrow in this case, and Loop 280, as you all know, it's a non-system facility, and Techstart have plans to improve as well, and they recently added medians along 288, so that will give some protection for pedestrian crossings in the future. And with this improvements, the signal optimization and the error in functioning can be controlled. At the same time, the indications would be slightly bigger than what it is right now in field. - So with that being said, and the timing, is that gonna change throughout the year, based on when the school session is in? - Yes, we have the flexibility with this, we can have multiple patterns within a day, and we can have it for school time, we can have it for weekends, we can even have it for morning and evening, so we have a lot more flexibility to adjust. - Thank you, while we're on the subject of Kingsrow, do you think that the signal timing is enough, does that represent a kind of a comprehensive solution to what we've been hearing from the public about that intersection, or is there more to it to address the concerns, the backups at Hodge? - Mayor Pritam, Chair, I believe that the signal project is going to improve, as Chandra mentioned, the timing in this area. I would say specifically related to that development, that's not on the posting for the agenda today, so we would have to discuss that at a later time. But we do know that the signal timing in that area is going to be improved by this project. We also know that, as Council Member McGuire alluded to, there are concerns in this area, so we know this project will help improve in that area. I would also mention that staff is evaluating these improvements that are going to be made, and also evaluating the timing of the signal in this area. We are also looking into, from the timing perspective and the school district, we understand that many individuals in this area were actually driving their children to school, versus having them ride the school bus due to COVID, and so we are evaluating that, and seeing if that does need, additional improvements need to be made from a timing perspective. So this is specifically a project that's already been planned, regardless of anything else that's going on in the area. - I'll sneak it in under E5 anyway, so that's all right. I did specifically mention the signaling in my comments, but I take your stern correction there. - I also want to mention that this is proposed to go to Council on August 10th, for adoption and approval through the City Council. So this is something that TxDOT is very interested in us moving through the process, as the way that they actually bid these projects, it's not just the City of Denton, it's also the City of McKinney. So they're very interested in getting this completed so that they can have the contractor go out and do the improvements to these signals for these multiple cities. - I think it's great, thank you so much. Have you presented to us before? - No, this is my first presentation. - I thought so, congratulations. - Thank you, thank you. - Are we good? - Yeah, we're good. - Yeah, okay. (laughing) - Yes, you had to look like, there was a thing I wanted to say and you neglected to ask me. (laughing) - I just finished my talk, you heard me. - Yeah, wow, I want some of that. Okay, so moving on to item E, MC21-029 staff report. - Wonderful, well thank you so much. I know all of you know me, but I am Becky Devaney, the City Engineer and Director of Capital Projects and I have an exciting announcement. I know this is a much awaited position. And so the first item on our agenda today is for Mr. Nathan George to come up to the podium. (applauding) And introduce himself. Nathan is going to explain to you some of his education, experience, technical background. Nathan started with us on Monday and he is our new Senior Planner, Bicycle Pedestrian and ADA Coordinator. And so I'm gonna turn this over to Nathan so he can visit with you briefly. And I know there's gonna be much more opportunity for us to have other conversations. And so he is at the point, I guess it's been three days, so I would say he probably could mention to you that he is drinking from a fire hose, as they say from this point. But he's ready to go and already tackled a few things for us and been in the field. So we're very delighted to have him and I'm gonna turn it over to Nathan. - All right, so my name is Nathan George. I'm very happy to be here. When I told people I am moving to Denton, Texas, the first question people asked me was why are you moving to Texas? Do you have family there? I am an East Coast based individual. So I come to you from Washington, D.C. Worked in the consulting field. I've spent almost 20 years in this field working transportation, land development and the bulk of my time has been in the transportation sector. So the reason that really drew me here was that I was looking for a new opportunity. I wanted to transition out of the private sector into the public sector and put a lot of my experience to use during the types of projects that I was able to glean from a lot of research on the city that are of interest, bicycle and pedestrian access, safety, all those things that are really the subjects that generated a lot of interest in this position. So when I started to do some research, I realized there was a really good fit with your interest and with mine. So to give you a little background on myself, I have an undergraduate degree in environmental management from University of Maryland. It's now called Global Campus, but University of Maryland University College when I went there. And I was working in the transportation sector as a traffic engineer for about a decade that I was designing intersections and signals and things like that. And I didn't really, I wasn't an engineer. I didn't really wanna stay in that career field. So I was looking for an opportunity to put my skills into practice in something. I was a little more specialized, found myself really gravitating to pedestrian safety as a big issue that's very important to me. So a lot of people hear bike in my title and they gravitate towards the bike side, but I actually like to focus on the ped side and ped safety is really my area of specialty. And I also really have worked on a lot of innovative bike designs around Washington DC and the mid Atlantic area. So I have a lot of experience there as well. So I have a really robust and full background of experience that I'm bringing to the city. I'm really excited to put that to work. I'm really excited to work directly with leadership to bring some of those innovative ideas to the city and try and work out and solve some of the challenges that come up on projects as they naturally do. And happy to give you guys more background. You'll get to know me a lot because I'll be here. Our family is moving here next month, but I'll be here permanently and looking forward to collaborating with city staff, with the entire leadership of the city and to making these projects very successful and achieving your goals because we're here to work together. So if you have any questions, I'll be happy to answer. - You know me. So obviously you're aware of the fact that you know the issues that you're gonna be dealing with are things that are very high priority for council, very high priority for the community. I would say that we are sort of in a period of transition where we were sort of semi-rural slash suburban and we're really looking to be you know more of a dense, urban, walkable, bikeable type environment. So you've got your work cut out for you for sure and we're very excited to have you. I'm curious if you could speak to your experience with ADA related issues. What kind of training do you have in that area? - Okay, yeah, ADA is a very comprehensive area within the field of transportation. A lot of my work was focused on intersection improvements and you know I've had to from a planning and design perspective. So I've had to work through development of programs to you know to bring facilities into compliance at a county wide ADA transition plan for a transit system for example. So you know a lot of my work did involve making all of our transportation facilities compliant on transportation side. So you know not building that sort of experience and throughout that time you know this goes back to 2008 when I officially became transportation specific focus in my career. I've had a ton of training, worked through a lot of project specific and design specific work that centered around ADA and then you know ADA pairs with a lot of the other types of improvements that we designed so you know that naturally comes along with traffic controls and the innovations that have come into practice in our field over that time. So you know I'm not just looking at projects from the ADA compliant perspective and making sure that we're addressing those needs but also looking at how can we improve traffic controls, how does that influence safety. So looking at it as a more robust and holistic sort of approach and trying to make sure that we're navigating the process so that we're achieving sort of multiply benefits if you will. Segregating users, there's been a lot of work recently where we're looking at like dedicated bike facilities and how does that influence the multimodal not just ADA but how those multiple modes are addressed and we identify conflicts and mitigate them. So there's a, we can talk four hours about that so I'll just leave it there. - Oh we will. - Oh we will, yes. (laughing) - Council Member Perkins. - I am so happy to see you. My background is health and safety as well but environmental management and all of that good stuff so I'm very excited to know that there's someone here that's gonna be dedicated to the safety and well being of our bikers and our multiple able people here in the city. And just knowing that this is a city that has two major universities in it where the majority of the people that live there and live around there are biking, walking people. So I'm glad you're here. This is like a breath of fresh air. I'll move on with my question. What makes a street qualified to have a sidewalk on it? - How do we determine where to put a sidewalk? - That is a quite nuanced question and we have been looking at the sidewalk program this week since I arrived and I got a nice briefing on that yesterday. Typically I would tell you that a sidewalk should belong on any urban street. That's my personal opinion. There are going to be some nuanced details to that but certainly when you're in an urban environment sidewalk should be provided. It's part of a complete streets environment unless drivers truly wanna be sharing the street with pedestrians or bicyclists we really need to accommodate those users outside of the roadway. So that's where there will be some nuance and I personally live on a more suburban street that has no sidewalks. There are cases where you don't have a lot of traffic, traffic volumes are low, speeds are low. So it's really a character assessment what are the characteristics of the road, the nature of the traffic and that's going to help influence when we should provide those dedicated facilities versus when it might function a little bit better as a shared street. But those are certainly conversations we'll have a lot as we're trying to figure out where to put sidewalks in the city, how to prioritize those needs because that's a theme that I've heard talking with staff. So we'll certainly be trying to figure out the answers to those questions on each street segment throughout the city as we try and put a response to good use. - And Council Member Byrd, I think I would just mention that there are city standard details that show what the cross section of a roadway should be, whether it's a residential street section, a primary arterial, secondary arterial or a collector status. And so what our goal is is to be able to bring Nathan into the design of those different types of roadways, whether it's a brand new project or a brand new roadway being constructed or a roadway that is being rehabilitated and using his expertise to see what makes the most sense from that multimodal perspective. So it's very much, I would say in general, what we've seen and what Nathan and I've talked in great detail about is we're very much interested in getting the roadway reconstructed, right? So, and I think that there is definitely a interest to take into consideration all those other modes such as sidewalks and bicycle. And so I definitely think that Nathan's gonna be able to help provide that technical expertise to our team, which we're very excited about. I would mention, there are always gonna be challenges that we're gonna run into. In many cases, I think from a sidewalk perspective, as long as the right-of-way is available, it makes it much easier to construct. But there are cases and we receive citizen comments that come through that say, I don't want a sidewalk on my property. And so that does happen quite a bit and more often than you actually probably would realize. And so the other thing is many times easements have to be acquired just to be able to put sidewalk within them. So those are some of the challenges that we are super excited to have Nathan on board to take his background and his expertise and look at that roadway cross-section between Chandra and Nathan from that transportation traffic engineering perspective, and then also including that sidewalk perspective. So just thought I would add that just because it's a typical cross-section doesn't necessarily always mean that that's going to be the method of which we move forward. We have to do what makes sense. And I also don't want to look at it from the perspective, and I know Nathan doesn't either, of a singular road. We want to take the opportunity to look at it more globally. And I think you see that from our team as we bring things more to you in a programmatic approach versus just focusing on an individual roadway, so. - Well, I'm going to express my, of course, biasness to my area, District One. It is the urban, you know, more of the urban type. It's the closer-knit, smaller road area. And I have seen some sidewalks in that area that could definitely use some immediate attention. So when you all get started, would you all consider that area, you know, as a priority area, it's more denser than the other areas. So I'd like to see that, you know, as part of your priority area that you look at. - Sure, I think we absolutely can take any requests that come in into consideration. I will tell you, another one of our project managers has worked to develop an entire sidewalk work plan program. And so we have really an executed, well-thought-out plan and how we take those sidewalks and incorporate them into projects such as the 2019 Bond Program. So definitely interested in looking at any improvement areas of which need additional sidewalks. So, you know, I definitely think that there's always opportunity to see how we can do things better. - Wes? If I can turn my mic on, there it is. So you mentioned, you know, that it's not unusual to have residential areas where property owners have said that they don't want sidewalks on their property. And I've heard that quite a bit in D4. And an area that comes to mind is Southridge. I've heard from a lot of Southridge residents that, you know, they wouldn't mind sidewalks, but you know, maybe it's not a high priority for them, or maybe they don't want to give up, you know, yard space for that. So the thought has crossed my mind, and sorry to get into like real specifics, but for example, an area like Pennsylvania Drive, where in some places the roadway is very wide and there are no sidewalks. - Would you mind if I ask you to hold it for item five, I'll just feel a little bit better about the unposting. - Yes, I will hold. - Thanks. I hate to do that, but you know. Yeah, and I'll just say, Nathan, welcome. - Thank you. - You've come to a really great community. I think you'll enjoy living here. I'll instruct you, if I may, that the correct answer, if you're asked, are you from Texas, is I came as soon as I could. - Okay, I came as soon as I could. - Well done, well done. Fast learner, fast learner. And yeah, I think you really enjoy living here, and you have come at a great time, where there's lots of support, I would say, you know, demand even for becoming more multimodal, as other members have said, and I look forward to you helping puncture our ableism and help us be, you know, as accessible of a community as we can possibly be. - Thanks for that. I would definitely, I do wanna put in a plug, is it engaged in, or the, I wanna make sure that, you know, folks, as they're out and they see problems, let us know through that system, because that's gonna be one way that we're going to find some of those challenges, and also, we're working through the ADA transition plan, so we do have a good background that I'll be working through, that I've already started taking a look at. So I'm looking forward to putting my skills to work, and it's been a pleasure to meet you all, and I look forward to seeing a lot more of you in the months and years to come. - Great. - Thanks. - Thank you. - Awesome, thank you, Nathan. So as you could tell, we're very pleased to have Nathan on board. So he's had a fast, quick three days, and so thank you, Nathan, for taking that time. The next item that we wanted to bring forward last, Mobility Committee meeting, there was a question asked, and we received several questions kind of over the 2012 Bike Denton plan, and we just wanted to let the committee know, now that Nathan is on board, we are currently reviewing that plan that was presented back in 2012, evaluating it, looking at it in relation to the existing capital projects, and then also coordinating, really, with Nathan on future projects. So definitely something that I know many folks brought to our attention and our radar, and so we appreciate that, and we're gonna be working through and coordinating that. So hopefully that answers some of the questions that had existed. No problem, sir, happy to do so. We actually have been meeting with North Texas in relation to the 2012 bike plan, also. So just, you know, there's a lot of conversations going on, and now that we have the right folks at the, and I guess they say on the seats on the bus, we're ready to rock and roll. The next item I wanted to bring forward, and I know, Chair, this is something that's definitely been on your radar. I know you've asked me about this multiple times, and so we did receive your request, and we have reviewed the resurfacing and street reconstruction plans. There's currently not an existing project coordinated with Oak Street between Bradley and Thomas. The new overall condition index for the streets has come in, so this is a recent, I know we were using 2015 data, and Streets Department has let us know that that new information has come in within the last couple of weeks. - Are you gonna tell us what it is on that stretch? - I don't have that number available, but I absolutely can get that number for you, but we are going to be working through how to program that street in the future based on its overall condition index. So definitely something that we wanna take from the concern and try to work it into the overall program. - Or charge admission to it. (laughing) - Well, yes, sir. So, and then I think the last item really we had on the staff update before we go to future agenda items is Council Member McGuire had asked for a list of overpasses for the 35 widening. And so we did provide that in the Friday report on July 2nd, but you'll see in your backup information, really all the different intersections. What I could tell you is based on kind of what we are looking at overall, the existing over or underpasses basically are being replaced or reconstructed. The only one that we're aware of to date that is new is that Windsor. And I think you've seen that come for you before with the Westgate presentation. So that is the one that we are aware of at this time. So if anybody has any questions on that, I'd be happy to answer. If not, we can move on to future items. - Oh, I just want to express my disappointment that I missed the boat on that scripture. - So we're good on four for the moment, yeah. And then, but why don't you go ahead, we're on five now. You had some items that you wanted to look for focus on. - We actually, let's see, on the future staff reports, I do believe that we have request, we have actually been working through several of these. If you'd like, I can go through and update on each one of these and then we can see if there's any additional requests. So update on the senior planner, that was the first item. So we've tackled that. The third item is the traffic engineering request, I can't speak, in regards to and related to Engage Denton. And we're kind of working through that for a potential heat map. I think some of this actually we're working on in coordination with the process of moving from the Engage Denton to the 311 system. So that's ongoing, it's definitely something on our radar. The 2012 bike plan, I know I just spoke to this and that's something that we did provide an update in the Friday report. The list of overpasses, that's been completed. And then the future plans for West Oak between Bradley and Thomas, and we just gave you that information. I think, I guess what we could add to that is you'd like to see what the OCI rating is based on the new data from that. I gleaned that from the smile that I saw on your face. So definitely something that we can look at and get from the streets department is that information for that cross section. So with that, I will open it up and y'all can let us know other future agenda items you'd like for us to look into. - Okay, so I would like this looked into, but perhaps you can also provide a little bit of insight regarding feasibility. So as I mentioned, I have heard that concern from residents of Southridge in particular and to a lesser extent in Denia, the idea that sidewalks would be fine, but they don't necessarily wanna give that right of way. But for example, Pennsylvania Drive is a very wide roadway that doesn't have sidewalks along the entire length of it. Would it be feasible to, at some point in the future, redesign that roadway to be narrower so that sidewalks can, we can add sidewalks without doing right of way acquisition? Sorry, I couldn't get myself unmuted. I think I could talk loud enough without the microphone. But I think definitely that's a roadway cross section that we could look at. We would have to pull plat information to see what right of way was dedicated and what was constructed in that area. I think many of the concerns or questions that we get are specifically related to the fact that folks believe and citizens, residents believe that where the back of curb is located is really where the right of way stops. And in many cases, that's truly not true. The right of way does go into their private property, their private property line and the right of way above each other. And so I think in order to look at that, we would just have to evaluate it from an approach of where is the existing right of way line and then evaluate what measures could be taken if that's something that's an interest as to whether the existing right of way already is available for sidewalk to be constructed, even if it was on one side and not on both sides. The other options are, like you mentioned, looking at that roadway cross section to see if it's wider than it shall be and if there's ways to improve that. So typically those roadway reconstruction projects really are based on the OCI, the overall condition index. And so that would be another evaluation that would be done as we look through the work plan and what roadways need to be completed. Obviously looking at the infrastructure under the ground too that needs to be completed. So definitely there's several different options that can be looked into there, but we would have to have the background information to see the survey, where the actual right of way line is. I brought up the conversation about the location of sidewalks just simply from the standpoint that some of the things that we hear on some of the recent sidewalk projects that we've been under construction on is a misunderstanding that actually the right of way line, like I mentioned, is the back of curve where the right of way line actually goes into individuals. They think it's their property because they mow it and they maintain it and they water it and sprinkle it, but actually in many cases that is not necessarily the case. - I appreciate you making that point and I would add too that like particularly in the case of Pennsylvania Drive that there have been concerns about speeding and I would posit that that's probably, there is speeding on Pennsylvania Drive for sure and that the kind of excessive width of the roadway might be contributing to that. And I was gonna say something else, but I forgot what it was, so I will hand it off to Council Member Byrd who I believe had something else to ask. - He'll come back. - Speaking of speeding, I know that Moore Street is a thoroughfare now apparently and I'm always getting notices from the community about Moore Street is a very wide road, so I know that there's going to be some utility work done and I would like to see something to slow that road down. I've been on that road and I've even caught myself kind of going over the speed limit a little bit, but it's a easy road to speed down, so would you add that one please to the list? Lakey Street, that's not a particularly wide road and that may be just a community, something that the community needs to work out with them themselves is to take care of some of those roads, but Moore Street for sure is a road that I'm particularly concerned about. But my question is for that area, I know that we've already talked about the upgrades and the utility upgrades, can you give us the date when that's gonna start? Is that a fall project and where are we gonna start with the utility upgrade for that area? - And what street are we gonna start with? Is it Robertson Street? - So that's something that we're actually working through right now is the actual construction. The construction began on Monday. Okay, here comes Rachel, she's gonna correct me. I know we began construction. - Just to clarify, construction did begin on Monday, but that was for the MCFC and Loft streets that don't include any utilities and are not in Southeast Denton. So Southeast Denton construction will be beginning in early calendar year 2022. And we are still working through the sequencing on what specific streets that will be. - 'Cause I'm sure they're asking. - Sure, and I would say on the Seymour actually was something that happened the last weekend. I'm sorry, I was getting confused. I know Rachel and I were celebrating that portions of the bond package construction, but those were the ones that did not include utilities, which I know have very interesting names of MCFC and Loft. So that's really just the first initial of those roadways. But the actual 2019 bond specific to the Sedna area is something that we're using the Seymour approach. And so that actually, we received those, and you could go into greater detail if you'd like. - Sure, so we've got the two packages currently in Southeast Denton. We've got phase A and phase B. So phase B is what Becky's describing. It's got the construction manager at risk where we're actually reviewing those submittals that we got two weeks ago for that right now. Phase A is currently wrapping up design, and that's what will be initiating construction early calendar year 2022. So before we actually go to construction, we will have another community meeting, and we're happy to provide, because by our next mobility committee meeting, we should have more finite information on sequencing. We can talk to you specifically about what that first street or first series of streets is going to be, and we can bring that back to you either myself or the project manager, Seth Garcia, can give you those dates. But we do have movement in both the Southeast Denton phase A and phase B projects, both of which will be under construction within the next year. Right now we're just kind of working through the sequencing. - Okay. - And we do need to select a contractor for Southeast Denton phase A. So that's gonna be kind of the next leg. We're wrapping up the design right now. Hopefully by the end of this calendar, well actually by the end of quarter three, we plan to bring forward to the construction contract to consider what contractor we're gonna hire, and then that construction would begin early calendar year of 2022. - Thank you. - You're welcome. - And one other thing, just observation on Nottingham. We could see where those beautiful lawns are being, sidewalks are being put over those beautiful lawns, you know how you were talking about earlier? 380 and Nottingham North. I was just driving through there the other day and saw where the sidewalks were being laid for an area that actually needed a lot, needed the sidewalks. - Sure. - So, and as you were going through and saying that, you know, that doesn't really belong to the home, but to the city, you know, that was just a revelation. And so that's gonna help with the bike path 'cause there's also a little fake mini bike path kind of going down through that way as well. That's also a very fast street because it's on a hill. So, you know, it's working, it's coming along. Thank you very much. - No problem. And I would mention that the project manager on that sidewalk project has been in close coordination with the residents as, you know, they have different questions that come up. And so I definitely know that she's been sending us quite a bit of updates even in regards to some cardinals that were in the area and another bush that was in the, you know, to that level of detail. You know, obviously, as you're working with residents, it's very much important to us that we're communicating and coordinating so that they understand the expectation, definitely so. I did wanna circle back to the Moore Street. So I was given information by Logan, our management analyst, that she let me know that the actual Moore Street, and I was on vacation this day, but Moore Street actually was in the Friday report on February 2nd. And so we'll go back and see if there's anything additional we need to add, but I believe we've answered some of those questions in that Friday report, so. And thank you, Rachel, for coming to my rescue. So I appreciate that. There are 90 different projects going on, so I don't pretend to remember every single thing that's going on within the City of Denton. So we have great folks that were helping get the projects moving along, so. - I find I can remember three. And so if you can have the other 87 on a list, that's usually helpful. - Okay, well, maybe we can, like, test each other in some kinda quiz or something. - I have a couple of items to add. - Sure, yes, sir. - Actually, it was, you know, Council Member Byrd made the, you know, eminently sensible comment to me earlier, you know, my sharing that, you know, we would not necessarily have heard about how troubled that area around Hodges had there not been the prospect of future development. So that leads to two points. One is, as I tried to tee up earlier, is there a more comprehensive approach needed in addition to the signal improvements at Kingsway and 288 to alleviate that situation? I don't expect to have the answer, but I'm putting it on the list. - Sure, no, absolutely. And I will tell you that Chandra and I have had this on our radar since about March, and not specifically related to the development in that area, and I'm, you know, open to having some of that conversation, and definitely know that there needs to be additional conversation based on the posting last night. What I will tell you is Chandra and I have been evaluating that Hodge Elementary and coordinating with DISD. We understood that there was a greater presence of parents or caretakers that were actually taking their children to school, simply from the standpoint that they didn't want their children to be riding the school bus due to COVID. So definitely we had improvement measures that we were looking at, even making specifically around Hodge Elementary that we were gonna be coordinating with DISD on, even looking at, in some areas, some one-way traffic just to keep traffic flow during the school hours and putting up proper posting. What we decided and evaluated and made the decision to do is wait to see to the new school year, because it was something that was basically gonna be enacted for about six weeks, and knowing that the overall situation due to COVID, we were hoping to improve and change. And so when the new school year comes through, we are committed to looking at that, evaluating that if we need to perform additional studies in that area, traffic count studies, we will do so. And specifically regarding that development with the traffic impact analysis that was performed in that area, and this is some of the information that will be provided in that presentation with the development. There are measures that we have been working on, and Chandra's reviewed that traffic impact analysis three times, so they submitted three different times. And we did work through with them some improvement measures that could be made, such as additional turn, a left turn lane into that Deerwood area, along with we already knew we had the signal improvement, the pedestrian improvements in that area. So definitely something that's on our radar, but maybe was escalated due to the fact that there was a development in that area, if that helps answer the question. - Yep, and yes, it does. - Okay, good. - What it also points to, to me, is the fact that sometimes unless something is really screaming, flaming, and burning, the public comes to us en masse, it's not necessarily on our radar, but it may be on yours, but I'm wondering, are there other situations like that, that, you know, but for some new development, we might not hear about, you know, are we aware of the other Hodges, if there are any, around the city, so that, you know, we're kind of proactively on top of them? And how do we know? - So I think that kind of goes into not only looking at things when they're brought to our attention, either through an engaged in council request, a citizen request, or even something that we hear, you know, just from other individuals within other departments and other users of the roadway network system. I would say that we definitely look into different, whether it's a traffic impact analysis that needs to happen, or a traffic study, and we have a budget that's set aside, and you'll see even some supplemental requests when we present our operating budget to ask for additional funding, to look at particular areas of which we want to focus in on, or areas we want to improve. Ultimately, the solution is, such as you see the HSIP, to make some signal upgrades. There may be some other areas where turn lanes are needed, or, you know, striping signaling's needed. But ultimately, our goal is to turn those things into capital projects. If they are in coordination with a capital project, that's fantastic. If they need to be a standalone project to do intersection improvements, we have two currently that the project managers are delivering, one's the 2018, and one's the 2019. So definitely there's areas that we receive the heightened alert about, or we evaluate ourself. - That's really my question. It's not the response, which, you know, we're very systematic about, it's, how do we know, are we, you know, is there any way that we can know proactively without, you know, before people have to say, hey, aren't you aware that there's a screaming, burning, flaming problem, you know? - Sure, and I think that's where we take the mobility plan and look at those future roadway networks based on the land use assumptions, and that's why it's so important that the comp plan and those future land use assumptions take into consideration, you know, what is programmed for those land use assumptions, how we look at the roadway network that makes sense with those land use assumptions, and then evaluate those, and ultimately, our goal would be to take projects that are on the mobility plan and turn them into capital projects, and there are different studies and evaluations we do based on level of service, and those would be performed through a traffic impact analysis. So I will tell you, you know, certain areas that we see that need to have improvements made, many of the measures that will need to be made is either through a traffic impact analysis or an actual traffic study, and we are proactively looking at those and working through then trying to put them into an actual project. Westgate is another example of an area where we are looking at what are improvements that need to be made, how do we conform to the mobility plan, you know, what does the traffic impact analysis show or the traffic studies show in this area? - Well, I'm gonna take inspiration from Council Member McGuire being willing to tee up, you know, a potentially harebrained thought. (laughing) - Sure. - And, you know, maybe, you know, you can build onto it into a reasonable one. You know, if we had chopper seven, you know, traffic on the ones or whatever, and then we'd hear about all the time where the pileups are, but we don't. We're not that big yet. - The harebrained ideas, you know, would it ever make sense to fly a drone around during peak traffic times and see empirically where problems seem to be? - Definitely. - Do you agree that that is harebrained sounding? - Oh, no, sir. I'm not ever gonna say any idea you have is harebrained. But I definitely do know that we have drones within the city of Denton and licensed drone operators. I think that's something that we could get an evaluation, I think, to get the actual data that we would need to make the determination. It's in our best interest to perform a traffic study because it looks at the counts, but I think-- - I mean, to give you, you know, clues where to look. - Sure, sure. And I will tell you too, ultimately, our goal, you heard me mention the sidewalk work plan. Ultimately, our goal is also to have work plans for all those different areas and then, you know, have all of the different needs, whether it be intersection improvements, whether it be sidewalk, whether it be bike lane, use the mobility plan and those different sidewalk, bicycle and thoroughfare plans within the mobility plan as kind of that planning tool, but then ultimately taking it from that, putting it in an actual work plan with a programmatic approach as to how we execute those and then actually completing those projects. So I don't think it's a bad idea at all and I know I'm more than happy to talk to Chandra about it. I know Chandra and I are aware of several intersections that we already have concerns about and so that's what we're doing is looking at how do we make improvements to those and I would say many of these intersections are being improved through the HSIP program 'cause there are a handful of them that are already under construction and then even a few more that we are seeing come through. So I guess the other thing I would mention is once the land use assumptions are completed from the comp plan and we can work to finalize the mobility plan, we can also look at what is the existing roadway system, network on a specific roadway and what is it to be and when is that timing so we can work on planning that in more of a capital perspective because that also impacts utilities, sidewalk, street light, there's a whole lot of things that go into that and that'll help us package up and plan those projects so. - I have one more. - Sure. - I know this item's been running long, we're almost out. I think it's gonna be really annoying to the public to see Elm, was it Elm and Locust that have to get mill and overlay and then undone and reconstructed? - Yes sir. And I don't have a solution, but my request is for at least a conversation to occur, but this is sort of like your kind of CIP planning project that you're doing, but to have a conversation occur between y'all and public communications about how to communicate to the public. It is bound to just really make people nuts when they see it fixed and then undone and then done again. And I think just kinda looking the other way is probably not the right answer, it might be, but I think a conversation oughta happen. That's the last one I have on that. So anyone else have anything on the additional items? - I just have a comment on the Hodge Elementary situation. - Yes ma'am. - It just so happens that I'm a substitute teacher, a retired teacher and started studying and Hodge Elementary is one of my preferred schools to go to, so I've had opportunities to put kids in cars. Being a teacher, you go out there and you load the kids up and everything. And it is a revelation that it was more so of a problem because of the COVID than it is on any other regular day that I've experienced going there. I probably go to that school more than any other school that I attend, I like that school. And it's still the same way, it's still a long, it's a backup all the way, like what we saw, but I don't think that it was something that extensive. So that's probably why we hadn't heard about it. Because the parents were used to just kinda being in line, but the line flowed. You know, as the kids were getting into the cars, they always made sure that those kids were ready to hop in those cars when the parents pulled up. So, but it is, it should have been, should have been looked at a long time ago. But I think because of the parents bringing the kids, you know, more so now because of the COVID situation, that that's what we saw. So I'm glad, I'm just glad we just finally addressing that and also connecting with the school and Didn't ISD to even make some different kind of arrangements as to how they put the kids in the cars. I don't know if they can go around the school or change the bus section to the, 'cause you notice the buses were coming from a different direction than the cars, you know, coming back out of the neighborhood. So maybe that might need to be adjusted. I'm not sure how you all or if you all are, I'm sure you gotta be sitting down with Didn't ISD and the school itself to see how that might be rerouted as well, so they, anything can help. But I just wanted to just, you know, put that in, put that on the table that it does still get backed up even if it wasn't COVID. - Oh sure. - But not to that extent that we saw with cars driving on sidewalks because they're frustrated about waiting. - Sure, and I understand that and I would say that overall when individuals are picking their children up from school, there's always going to be a line of cars. I mean, I've experienced that myself with my own children. And so, you know, I think the fact of the matter is, is that for a short period of time, you know, but is it to a level that is something that there is a actual transportation issue that can be resolved? And that's really what we're most interested in as we know school is gonna be starting back up in a few weeks and doing that evaluation. So, you know, seeing if there's anything and Chandra had already come up with a great plan to look at some one-way traffic and we do meet with DISD monthly. And so those are definitely things that we will bring to their attention once we have additional data to show that that is a need, but we're really waiting to see kind of what happens with the COVID. So, and Chair, I wanted to bring up to you to I do understand your concern about Elm and Locust. I think from the city staff concern is that currently that reconstruction is not programmed and they're looking at ways to evaluate that and ways to actually do the project that was to be, to happen with that final reconstruction. And I do understand that there will be public outreach that's needed. I think from a city staff perspective, we're more concerned about the fact that that roadway could stay in existing condition and if a mill and overlay did not happen, it could be a year in order for that project to be able to be designed and then work through the bidding process, funding process and construction. So although the stop gap may not be the solution that would have been preferred from our perspective, we are more concerned about the fact that that roadway will be in a state of disrepair for a longer period of time. So that was really an interim step. - Not mutually exclusive to do the right thing and have good communication about it, right? - Yeah, no, and I think that would be our goal is to be able to communicate and really honestly, that's our goal with everything because even temporary patch that's put down many times or permanent patch that's put down is torn back up and then a roadway is reconstructed and a lot of that just goes for the education piece. So I'm definitely happy to look into, just wanted to let you know that the timing is really what is more of our concern. And wanna make sure that that's addressed because if not, I know it's going to be something that we definitely are going to hear about and we want to take the opportunity to work with TxDOT to try to address. - I remembered what I was gonna say. - Sure. - It was about OCI. I had wanted to acknowledge that in terms of Pennsylvania Drive, I'm sure like OCI, it's not a super high priority. But I was just using that as an example of, you know, I'd like to see us considering, especially with those older residential streets, the possibility of narrowing them as like a traffic calming measure and as a way to make them more pedestrian friendly. - Awesome, I appreciate that update. - We all good on the future items? Yep, so we're on to concluding items. Anyone else have any concluding items? (indistinct) - Okay, I have two. First, I wanna thank City Engineer DeViney and whatever her incredibly long title is, Rachel, for helping on my town hall and fielding questions on the spot about this stuff. That's how you know that people go nuts about things getting done twice. But super job and second item is, comments have been made regarding the special session that we had. And I just want to underscore my view that first of all is terrific management of the process from staff to have there be a way for council to express as a body, you know, our guidance to our DCTA rep. And furthermore, I just think you did an outstanding job of managing the special session. It's not an unusual, it was not a usual situation. It was a special situation. And I would say that when it's sort of high stake stuff that really matters and there's time pressure on it, what that looks like, having spent 30 years in the private sector, I would say that looks like work, that's how work looks. That's how teamwork looks when it's done. It's really hard and complicated and takes a lot of focus and you just did great. And I think the proof is in the pudding that there was a very clear communication to council of the intention and it ultimately achieved a super majority so they were able to vote on it. So thank you very much for working in an unusual way and I underscore the word working. Not always comfortable, that's what work looks like. - Thank you. With that, I'll close the meeting. Thank you, we're adjourning at 11.15.
Back to Meeting