Mobility Committee Meeting Summary – May 24, 2023
1. Citizen Comments on Agenda Items
- No citizens requested to speak on agenda items.
2. Items for Individual Consideration
- MC23-013: Approved the minutes from the February 22, 2023 meeting.
- MC23-011: Received a report and held a discussion on the City of Denton Transportation/Mobility Project Status Report. Key points included:
- 2181 N/S Road is open to traffic with ongoing lane adjustments and erosion control.
- 35 North project (CSJs 081, 074, and 081) is on track, with utility relocations progressing to enable a November let date (originally September 23).
- Merge project (77 South to 35 split) faces utility issues but aims for a September let date, fully funded in the UTP.
- Mayhill project is preparing for a December 2023 completion, funded and on schedule.
- Frontage road projects (407 to 2449) are in design, with a focus on addressing utility and floodplain challenges.
- 380 East to 288 connection is being designed for future freeway integration.
- Outer Loop project (US 77 to Loop) is undergoing a public meeting series, with environmental clearance targeting summer 2026.
- Alman Locust corridor improvements are in negotiation with the county and TextDOT, aiming for a summer 2026 environmental clearance.
- Bonnie Bray and Hickory Creek Road projects are progressing, with temporary pavement completed on Bonnie Bray and phase three of Hickory Creek Road set for Q1 2025.
- MC23-014: Discussed moving the Mobility Committee meeting time from 10:00 AM to 11:00 AM. The request was postponed pending potential changes in committee membership.
- MC23-016: Received a staff memorandum covering:
- Bonnie Bray Updates: Phase three opening today, phase six to be bid after acquiring necessary authority; both with two-year construction timelines.
- Hickory Creek Road Phase Three: Continues with minor utility issues, targeting Q1 2025 completion.
- Future Items:
- Monthly updates on Bonnie Bray and Hickory Creek Road.
- Ryan Road on hold until Hickory Creek Phase Three completes.
- TextDOT citywide speed study requiring updated maps and mile markers; timeline pending.
- Construction guide and education initiatives for clearer project communication.
3. Concluding Items
- Under Texas Open Meetings Act, responded to inquiries and provided community interest reports.
- Discussed bicycle ballot deployment status and the recent departure of a transportation employee, with plans to provide updates at the next meeting.
4. Action Items / Next Steps
- Continue monthly Bonnie Bray and Hickory Creek Road updates.
- Await TextDOT citywide speed study feedback and provide updates at the June 27 meeting.
- Prepare presentations on bicycle ballot rollout and hiring status for the next meeting.
- Monitor committee membership changes before deciding on the meeting time adjustment.
Meeting Adjourned at 10:45 AM.