Mar 23, 2022 Mobility Committee on 2022-03-23 9:00 AM

March 23, 2022 Mobility Committee

Full Transcript
16073 words Download SRT Download VTT
- Good morning and welcome to this meeting of the Mobility Committee of the City of Denton. We have a quorum, but we have a full house. So let's begin our items for individual consideration. The first item is consider approval of the minutes of February 16th, 2022. I'll entertain a motion. - I move approval of minutes. - Is there a second? Okay, all in favor, aye. - Aye. - Aye. - The minutes are approved. The next item is a receiver report to hold a discussion regarding the City of Denton transportation/mobility project status report. Mr. Poulster, good morning. - Hello, hello. Is that ready for the meeting to go on? - That means soft. You have to very gently touch it for exactly half of a second. - I just saw that. See, y'all told me that, didn't ya? There you go. Uh-oh, okay. We'll go by Braille. No, no, no, we are in the roll. I got this stuff memorized. So this first sheet, for those of you who are watching, this is a project summary. It goes over the let dates, who's working on it, and then what the construction cost is. And these are essentially the projects in the report that we'll go over today. And it totals, we're chasing about two billion dollars worth of improvements in and around the City of Denton. FM 2181, north-south. - Pardon me, John. I have the number in my head of 2.4 billion for the longest time. - So what happens is as projects come off, like that 1.4 million for the 380 interim, as they come off, we take 'em off the list. - Got it. - So 2181, we have a completion date of October 22. Finally, it's been going on for like 37 years. And it's still looking like October will be complete. And we are in the last throws of our last shift that occurred on March 14th. And so from this point forward, it's just getting the last bit of pavement down. And then I would say sometime in summer, we'll get to what we call substantially complete, which is where you're driving on the lanes in the proper location that you should be. And everything else is just ancillary work, like growing the grass, moving the signal poles, et cetera. So we will definitely be coming back with a party on that one. - I have a question about that one. First of all, I wanna thank staff for pushing out the information about, there was a closure, where was it? At like Ranch Man or Briar Forest, somewhere in that area. And I know that there have been issues with closures in that area in the past. So thank y'all for communicating to residents so clearly about that one. The intersection of Teasley and Robinson is really a wreck. There's a grade difference and it's just dirt. And with the rain we've been having, it's already, the dirt is like washed out and there's like a huge drop-off. And that's a real busy intersection. Can we see about maybe getting like asphalt? - Yeah, we'll get with Travis Campbell. I'll do that as soon as I get out the door. - Great, thanks. Okay, so your I-35E Mayhill job, this is a project from Mayhill up to 288, including the northbound and southbound frontage roads to 288 and a direct connect with, I mean a bypass over Brinker. We are ready to let is September 23. And we are on track for that. If you'll note, we are in the 95% plan review and primarily, yeah, all of this from this point, we see utilities down or all the utilities that we're working on to get relocated by that September 23 timeframe. We believe that we will make that date. TxDOT and City of Dent's been working diligently to ensure that the additional scope of work that we added to the project doesn't impact the city's ability to move their utilities. And like I say, we're on track for September 23. And the difference between the let date and the ready to let is, ready to let is when everything's done. Ready to let is when the money currently is allocated because that's what the date they thought it would be. But once we show them that we can hit the 23 date, the funding is there. It's fully funded at $72 million, so we'll be able to move the project up to the ready to let date. Okay. The big job, the merge, we will be done with the RIDO acquisition at the end of this month. There's one parcel left that we have some legal work to do. The utilities are ongoing in this corridor. They are, you'll see in a second, quite lengthy. And we are pushing for a ready to let of August 23 as well. And again, the design's essentially done. We've been working with TxDOT on the aesthetics for this corridor 'cause we wanna be able to do some things in the corridor that we did in the 35E section where we added some aesthetics. And we are working on that packet to be included in the design and the construction of the project by TxDOT. And then again, here from utilities all the way down to the bottom of the page. These are all the utilities that have to get done, but we believe that we are gonna make that, what was it, August 23 date. The interim, that's done. We just wanted to leave it in one more month 'cause it was a good project to see. And actually, we were waiting for a couple of the polls to be moved. And I did check from our last conversation we had that caution sign they have when there's congestion ahead, it triggers, it's not been triggered on this project since we've done the interim improvements. I don't know what's going on. All right, I-35 North, this is the $763 million one. It'll be ready to let in December 23. Again, it's fully funded. We get to that date, we can move the money, and that'll go all the way up to the county line. Again, lots of utilities. 35W Frontage Road. So we've been waiting for TxDOT to enter into a contract with HNTB to do the design on this project that's environmentally cleared. Apparently, they couldn't get to a number, so TxDOT terminated that negotiations and they're negotiating with an alternate firm. They have not told us who that alternate firm is, but I told them they're running out of time, so we're kind of in a holding pattern on the design until TxDOT gets somebody on contract. You're at 380, 377 Corridor. That's under construction, and we're talking about a completion date. Here it is right here, December of 23. And right now, we're moving a little bit faster into phase two on the westbound side, and we're using daily closures to do that. And we're trying to get the bridges secured, the under abutments secured, so we can put that center median barrier because the accidents that are happening on this section of 380 are crossovers. And once we get the bridges shored up, we can put the physical barrier in the middle and it'll preclude those types of accidents. 380 East, it's under construction. It's basically a lot of the dirt removal and stormwater work and a lot of culverts. And so it's mostly underground work that you're seeing done. And I would just say if you don't have to go out there, don't go out there 'cause it's pretty rough. Okay, the 380 feasibility study has been completed. And it essentially says there was a lot of stuff about the integrated corridor, a lot of stuff about the outer loop in it. And the 380 feasibility says we're gonna build a freeway on the blue section and we need to add frontage roads to the brown section of the loop. And so it's closed out and so we're gonna get back with TxDOT tomorrow and get some clarity on some of the components of your thoroughfare plan and the county's thoroughfare plan to make sure they're consistent with the findings of this report. But there'll be things coming off. For example, we had references to the integrated corridor. That's no longer a thing. And so we're just taking the outer loop all the way across to Milam. And 380 will be the freeway and 288 will be turned into a freeway. And so we'll get with city staff and TxDOT together and then we'll come back to you with recommendations on changing your thoroughfare plan to acknowledge those things. And speaking of Luke 28 West, this takes it from 35 all the way around. We have Chang Patel on contract. And they are doing the design and the design is anticipated to be October 23. We're shooting for a 26 ready to let date because we have a lot of utilities we have to deal with in this corridor and not the least of which are all the natural gas providers out there that we have to avoid. 1515 LTRA is doing that work. We got the reevaluation. Remember we came back after we got environmentally cleared, removed the traffic circle, made some tweaks at the Peterbilt location and some other places. And we've got the reeval done. So now we're able to finalize the design set and go back to hit our schedule for the 1515. 1173, we hired half associates last month. I can't remember to do the PS and E on this job. And what we're trying to do is hit a June of next, this year for 60% plans adequate because when you hit that in June, that allows tech stock to start the utility relocations on this project. And we're trying to get this project to be consistent with the 35 jobs so that when we do the 35 job, we can, for a billion dollars project, you know, 47 million dollars is a rounding error and we're gonna try to get that project built with 35. Almond Locus, so I think we're working internally on that. I'm gonna be quiet at this point. Operator Error. - Yes, John, thank you so much. So we have received plans actually yesterday from TechStot for the Almond Locus corridor that's south of the square. And then we're gonna be meeting internally to review those. The field meetings have been conducted and working through that execution plan and making sure that we're all in agreement with the path forward and the pavement repair in that area. So because the plans are completed, once we can work through those steps of having those internal discussions, turning our comments back over to TechStot, then they'll give us a schedule from there as to what they anticipate to have that area completed. So-- - Pardon me, so how soon would we get to, at least even like a sketchy timetable? This is one of the areas, you know, we get asked about the most. - Sure, we do too, I feel your pain. Definitely, what I would anticipate is once we can have those internal conversations being that we received the plans yesterday and can work through that, I would anticipate that within the next timeframe of when we have the next mobility committee meeting, we could be able to produce you and provide you a schedule at that time. It's gonna take a little bit of time internally for us to have those final conversations, review that set of plans, but I would hope that we would have a rough schedule of that timeframe of when they could actually start the construction through their maintenance contract by the time we have the next mobility committee meeting. - And because it's a maintenance contract, it's more expeditious and, you know, if we get this last part done soon enough, I think that we're coming into a good paving season. You know, it'll just be a matter of us pressuring them to make it a priority. I think they already think it is. - That's what a priority looks like, okay. Can you help us with just like a short explanation or some language to answer the question, why has it taken so long? - Yes, the short answer? - Yeah, not the fully technical one, but when you can tell your neighbor. - Elm and Locust are tech stock project, our roads, but they are roads that were older roads that were basically put on the system when we did some stuff to 377th Street Town. City has always had utilities under the pavement and that causes problems with the pavement and the utilities and this last cycle of where the city needed to come in and do some very significant improvements to the downtown area for the utilities and drainage. Tech stock said, look, at one point a couple years ago, they held our permits hostage 'cause they said, we're not gonna let you do the work until you agree to take it off system. Well, now they've even reversed that and we have to like negotiate to get it off system. And so that held us up for a while and we finally got them to give us the permits and then it was a matter of, oh, we're gonna take it off system but it depends on quality of the road once it's done 'cause right now we're gonna tear it up and we don't wanna go back and do a base repair and full depth on those areas that we mess up and then you come back behind us and tear it all out and fix it to our standards and give it back to us. So there was a negotiated battle that dealt with that for about a year. And so it's just the process of you have a city road, it's a state facility with city utilities in it and they all have different purposes and they all have ways of getting in each other's way. - Trying to think of how to make that simpler. - I would just like to add to that because it's a textile roadway, textile gave us the permit to go ahead and do the construction for the water and sewer underneath the roadway, although it's a textile roadway. There's some terminology that we're still working through because the city from my understandings, understanding was that it was gonna be completely rebuilt and with TechStop working through with a maintenance program, it's going to have more of a rehabilitation type measure. So I'm looking at the types of the useful life of the roadway that's going to be constructed before the city says, yes, that's the path we want to go down. So there's a lot of conversations going back and forth, just simply from the standpoint that yes, we need the roadway completed and we need the roadway fixed, obviously, right? We all know that, we all have that same concern, but I also don't want, and I know Danny Kramer's sitting over in the area over there, but he has the individual with public works over the entire street operation, the city doesn't wanna accept and take a roadway into our system that doesn't meet our standards. And so it's a constant conversation, making sure that what is constructed is something that the city's comfortable with to the standard that we're comfortable with, because the previous conversations were from the understanding that if we did this utility work and drainage work, the roadway was gonna be completely reconstructed. It's now looking as if that's a more of a maintenance rehabilitation. So we're looking at what does that truly mean? And like I said, we got the plans yesterday so that we can now evaluate it. Staffs had multiple field visits, but I myself don't feel comfortable, and I know city manager's office and then of course, street operations, doesn't wanna take something on, nor does Textodot at this time want to put together that agreement that's not something that we can all come to terms with. And ultimately it impacts also, the roadways further north in this area. So it's kind of a catch-22 because they don't typically allow you to have utilities in the roadway. Those are past history. Those things happen probably in the 20s, 40s. I have no idea when that was constructed. So just understand the reason why it's taking a little bit of time is because we wanna make sure if we do say yes, we wanna move forward with that turn back and take that portion of the roadway over, that it's built to a standard that the city is comfortable with. - So let me try, and go ahead, please. - I was gonna wait until you were done. Yeah, I just have, what's circulating in my head is that any citizen that is driving through, of course the complaint is that it's just taking so long versus what they actually see. Big pipes on the road, things opening up. It's obvious that they are expanding because the city is growing. That's what I say. It's road work because the city is growing and they need to put bigger pipes in. That seems to be the basic type of conversation. But now I'm thinking, as I'm hearing, that the utilities are literally under the road, right? Is that what I heard? - Yes, ma'am, that's correct. - Because we're going to be upgrading some utilities under some roads that are in, already here. I appreciate hearing that. So generally, where are the utilities located when a new road is built? - Utilities are always located underneath the roadway. - Yeah, on a city road. - On a city roadway. Elm and Locus are state roads and the state doesn't allow utilities under their pavement. They'd have a 15-foot parkway on either side of the roadway that they allow utilities in and all the drainage for the roadway itself can be under pavement, but the utilities have to be outside in the parkway. - So this, I'm sorry. - No, go ahead. I was just going to say that typically, from the city perspective, what John's describing, that's called the utility accommodation zone. Cities typically don't go within the utility accommodation zone. We purchase, as you're aware of, of course, with the 35 Project, easements that are outside the right-of-way line so that our facilities can go in, water or sewer easements outside the TxDOT roadway. Correct. - But that can't happen on this roadway because it's an older road. - Well, the outside of the roadway is the sidewalk and then outside the sidewalk is the building. - Yeah. - So we are-- - So you're saying what we want. - Yeah, we're restricted. And so the good news is, the reason why I think the maintenance contract is going to go faster than we think is because about two months ago, the commission threw everybody a curve ball and says we may not be interested in turn back anymore. And so we may get the road upgraded, leave the utilities in the ground, and TxDOT come back and later go, we're not going to give it to you. So then you don't have to maintain it. - That's interesting. 'Cause our call, we're clearly voting. I didn't vote for it, but there was a vote on council to say that we would take it. I'm sorry. - Yeah, so I just wanted to, I don't know if now is the appropriate time to bring it up, but I just wanted to kind of, you know me, I like to throw ideas out there regardless of whether they're realistic or not. But given that we've got Paul and Brittany here today, I wonder if now would be a good opportunity to talk about this section of roadway and the section of roadway to the north. I know that the, you know, the phase one area, there aren't currently any bus routes that run on that roadway, but this is, you know, the core of the city. And as bus routes change and evolve over the years, you know, I hope that we'll have an eye toward roadway design that's accommodating of buses. You know, maybe that could include a pull-off or maybe it's just, I mean, I don't know if there are any design standards as far as like the quality of the pavement that needs to be bolstered if there are gonna be buses on it, but something to consider I think. - So if it stays on system, a lot of that, I mean, the pavement thickness is gonna be what the pavement thickness needs to be. But if it's on system, a lot of that stuff to accommodate the transit won't be allowed. That was part of the reason why we wanted to get it off system because once it's off system, you can create it in your own image. - And I would also mention that as we look at the plans that are being evaluated that we received, we also are gonna be looking at how the roadway can be striped, right? We wanna continue to have the two-lane capacity. I realize when you're coming, you know, going northbound on Locust, it's actually three lanes, but what Nathan is evaluating is looking at how we can include bike lanes, pedestrian facilities. TxDOT's not evaluating that because that's not a part of their overall approach, but it's working on that collaboration of what can we do to have the roadway striped appropriately to make sure that that's a corridor, that we do have the pedestrian accommodations and the bicycle accommodations to bring that multimodal approach to that roadway. - So just so you know, the reason why they have terminated turnbacks is because they found out that communities were taking their state facilities, reducing capacity and doing everything that Becky just said. And so that's when they killed it. They took one back from San Antonio that they gave to them in 2014, and they were about to go to construction with it, so. - Because, but what? - How dare a city provide accommodations for a desk fan? - Yeah, because they added facilities? - No, they, because they went from number of lanes to less lanes, and then they turned them into a multimodal facility. So everything you want to do, everything that everybody wants to do are the things they don't want you to do. And I'll be careful on how I say this, but there is some irony, or confusion. Well, someone's listening. They want you to take the road. It would be like buying a house from somebody, and then they tell you, you can't do any remodeling to it, right? After it's yours. - Yeah, that's weird. - That's what we're doing. - You know, I'm sorry to be beating at that horse. I know we got more to cover, but just a couple loose ends on this topic. Am I correct in understanding that the utility work, it's not just a matter of upgrading, it's part of the PEC-4, this is a question, is it part of the PEC-4 deal where, you know, it's, where we've done necessary work to get that area out of the floodplain? Is it connected with that? - The utility work, water and sewer construction, and also the drainage construction is complete. And we are working through what's called a LOMAR process to remove the area for phase one and two out of the floodplain, you are correct. - So it is part of that. So it's, we can talk a little more about it offline, but it's a really good thing. But, and then just to, for me, cap it off. So that, that's a good thing, I understand that. And then it's the status that the really, after the utility work, that there hasn't really been a lot of movement on the ground because we're in this negotiation over which way it's gonna get rebuilt or, you know. - So just, the guy that works for me, he used to be the area engineer here, and he had an anecdotal story with it. When he did a resurfacing of Elmer Locus at one point, and he, the contractor had, part of the contract was to when he discovered base failure, he was to repair the base failure, and he only had like 15%, whatever. And there was one area of Elmer Locus where they uncovered the pavement, they found a sinkhole big enough to put a car in. - Wow. - There wasn't anything between the pavement and that hole. We weren't sure how the road stayed up. And so what the city wants to make sure is, is that, you know, you got a pretty two inch overlay, it's not on quicksand. - Yeah, yeah. - And I just-- - I'm done, go ahead, did you? - Oh yeah, I'm done. - One last thing I just wanna mention with this entire conversation, we're only talking about the green section on the map, which is phase one. Obviously the blue section on the map, we still have water and wastewater utilities to improve. We still need a large sum of money to do the drainage improvements along that area. And then of course a similar conversation with TxDOT as to how the roadway will be reconstructed. So just wanted to clarify that the conversation we're having is just specifically with the areas of water insert that's already been completed and drainage. South of the courthouse. - Yes, sir. - Great, okay. Thanks for-- - Just for the record, all my reports that I've gone over really fast. When we get to the one for Becky, it takes longer. Oh, now we're done. - Well, actually-- - Actually. - I wonder if, you know, the other one that I hear the most about is Bonnie Bray, especially south of the university. Can we include a status on that when we talk about it? And, you know, it just, it doesn't feel to constituents like we're making any progress there. - So Bonnie Bray, phase four-- - Bonnie Bray, south of the university. - And five, but are you discussing, sir, between 380 and say 35, Bonnie Bray? - Yeah, south of the university. - University and-- - Sure. - So that's actually-- - Yeah, we're down to one lane, you know, big pipes along the side and all that, you know. - Staff can bring you a separate report as part of the staff update. If you'd like to continue to hear updates on the Bonnie Bray project, we don't have an issue with that. It's actually not a part of Mr. Polster's report because he's specifically talking about on-system roadways. - I thought we changed that, that it was, like it had been that for a long, long time. It was just textile. - No, no, for a long time, it was everything, and the stuff that wasn't me, I didn't know anything about, I was just putting it in a report. - Yeah, yeah, 'cause it's, we used to call it the on-system report, but now it's City of Denton Transportation. I thought we would cover our main, just topics of interest. Frankly, this precedes these guys being on here. Senator John Ryan asked for that. - I think the best way-- - It precedes you too, as a matter of fact. - Well, thank you. I think the best way for us to go about that, if you would be amenable to, is to have that as a part of our staff update, because it's a project that the city staff is managing, and it actually is something that we're collaborating with the county and the state on, specifically because of the funding, and of course because of, with COG, but it's not something that Mr. Polster would be able to have an update on. - Okay. - Yeah, if, I would appreciate it if we could get, you know, maybe a standing update each month from our staff, not from, not from John. - On Body, Brain, specifically? - Anyone but John. - Yes, on Body, Brain, specifically. - Sure, that's fine. - Since that's such a, such a big project, and it's so disruptive to a lot of folks, yeah. - Absolutely, we can add that as a part of the staff update. - Thank you. - Do we want to go over the acronyms? - Yes, absolutely. Thank you very much. - I can't turn it off. - Okay. I tend to, you know, I realize I tend to do these without breaks, is that, are you all right with that? Or would you like to take it, take, yeah, yeah, yeah. Okay. Okay, let me know. All right, so we'll move on to the next item. Receive a report and hold a discussion regarding updates from the Potentum County Transportation Authority. - Good morning. - Good morning. - Put my millennial skills to use. Oh, no, not like that. Like that. All right, good morning, Mayor Potem-Melzer, members of the council. My name is Brittany Farr. I'm the Director of Government Relations for Denton County Transportation Authority, and we are here today to provide you with an update of our activities at DCTA. I'll start by introducing our Deputy CEO, Mr. Paul Christina. As you're no doubt aware, Mr. Raymond Suarez submitted his resignation this month. As of April 1st, Mr. Christina will be taking over as our interim CEO. Seeing as how this is both of our first time to address this committee, we're going to tag team it today, safer in numbers. So I'll bring up Mr. Christina. He'll introduce himself, talk a little bit about our efforts around the comprehensive operation and fare structure analysis that's going on, and then I'll come in at the end to provide an overview of the Connect service changes that went into effect a couple of weeks ago on March 14th, as well as provide our response to the inclement weather that struck the region two times in the month of February. And then we'll both be here to answer any questions that you may have for us. So with that, I'll bring Paul up to the podium. Welcome, both of you. - Thank you very much. It's good to be with you. Like Brittany said, my name is Paul Christina, and I've been given the privilege of leading DCTA as an interim CEO beginning April 1st, and so I'm pleased to be with you today to provide the update on how we're moving forward with our comprehensive operations analysis that you all have been seeing in progress for some time. So at the core of what we're doing is that right now we're leveraging ridership data. - Do you want to take questions as you go, or should we hold them till the end? - I'm happy to have a conversation, so if you have questions and would like to raise your hand, please do, and we can talk through it, and that's just fine. Thank you for that. So right now what we're doing is designing an integrated service across all of DCTA's modes, and we're doing that by leveraging ridership data across GoZone and the Connect service in order to be able to make recommendations about the proper levels of service among those modes, fixed route and on demand, enabling us to implement what will be an integrated and complementary multimodal system. Fair pricing is part of that conversation because we believe that we can use the pricing of the GoZone service and the Connect service to cause riders to make decisions that are best for them and for the modes of service that we have available. So this chart here just shows the way that we're going to do that is right now we're in the process of looking at the fixed route network, and you've seen several revisions of that over the course of the last several months, and then as we think about how riders will use those or access those resources, it's through the GoZone app that will enable them to book a ride that uses a GoZone vehicle perhaps for a portion of their trip and a fixed route vehicle for the portion of their trip if that's the way that their trip aligns, and then like I said, we can use pricing, fair structure between those two modes to encourage the most efficient use of those resources and ultimately being able to deploy what is an intermodal solution for riders through the app or through the traditional means of purchasing tickets like they do today. - Does the app show alternate routes and estimated time of journey for each of them? - I think, so we're going to be going through this tomorrow with our board and just where we are in the process. It's going to be a very high level, but what I think you can expect to see is that a rider could put in their current origin, their destination, and provide here's the method by which you can use transit services to get from point A to point B. - The reason I ask that is as with any number of route planning apps that we all use, if the options are presented with the times and number of contacts, doesn't that provide incentive enough for the rider to go, oh, I want to go in the least amount of time or I want the one with the least changes. - Potentially, and I think that that sort of feedback is going to be really good for the public involvement process that we'll have over the course of the next 90 days. And so beginning about in April, again, our board will be briefed on this tomorrow, but there'll be a public comment period where people can provide that sort of feedback that could inform the way that these things get rolled out. Yes, ma'am. - Does that feedback also include comments from employees? - It is going to be an open public comment period that anyone will be able to provide input for, and when those channels are opened up, we're going to do our best effort to disseminate the channels for that far and wide so that everybody who's interested can make such comments. - Okay. So here's sort of a couple of bullets on where we've been and where we're going. It was in the December 2021 board meeting that we had the discussion about a COA that would be presented in the June 2022 meeting here in a few months to talk about the evolution of the service. We have on our team consultant experts from Accenture as well as VIA, who is the on-demand transportation provider for the GoZone project who are working to develop those alternatives. And we will have, like I said, a touch point with our board this month at tomorrow's board meeting to talk about how those things are being developed, then again in April and then again in May prior to the board making a decision in June, and obviously we will continue to use this forum as appropriate to provide updates on how that project progresses. In terms of the fare structure analysis and sort of the conversation that's being had, these are the things that we know. The initial GoZone program had a promotional price of 75 cents a ride, and then like I said before at the outset, the fare structure that we're considering will start there to determine what's the right way to engage riders to use the most efficient sort of trip to get where they're trying to go. We're in the process of that fare structure analysis now on tomorrow's conversation with the board will be more around what are the limits or boundaries of what that fare structure could be. - If I may, I don't know how tuned in you might've been to this process. I'm not quite sure when you joined the organization or whatever, but this body drafted a resolution that was then approved by council and was meant to be instruction to our representative at the time who wasn't that interested in representing us. But one of the things that was in our resolution was a request that we, that the idea of a fare free system be evaluated. So if you're evaluating fares. Now, I think at the outset, a person might say, well, that's completely crazy. But let me just say a little bit about why that's not necessarily the case. At the time, we were told that the fare contribution to total DCTA revenue is I believe less than half a percent. So essentially a rounding error. Your revenues are assured because they come from sales tax. It's nothing to do with whether you're efficient or not. The revenue comes in. - Right. - I'll offer you a little bit of a model. We've got the Thinline Festival is starting this weekend and then you've been a sponsor of it in the past and where that used to be a paper drink deal, an $8 thing. And I was on the board when the decision was made and I thought it seemed crazy at first to make it a free festival, but it's a game changer. It's just a different model. It doesn't mean you don't have revenues. It means it changes the model. Now in that case, the model is greater advertising revenue because more people will come to something that are free. For public transit, it takes away the friction so that instead of just providing service carefully to the small number of people who are dependent on transit, it takes away the psychological barrier. Free is a very powerful thing so that even people like the people in this room might go, I know I can get on. There's no friction. I don't have to know how it works. You know, it's something I can do. So that's why I think it's at least worth thinking about how would you configure the product to mitigate against whatever risks you think come with free. Like you have to get out at the end of a ride. Maybe there's a definition of what a ride is. It's unidirectional. But if you wanna meet the real goal of public transit of taking cars off the road and improving air quality, and really having transit be part of our, you know, much bigger part of how our community works, could that be evaluated? It's a long way to get to the end of that question. - I'm gonna jump in as your representative on the DCTA board. I'm well aware of that resolution, which I hope to draft. And this is something that I insisted on at our last board meeting that as one of the options that we consider when we discuss fare pricing options, I wanna see an analysis of eliminating fares, but I'll let Paul elaborate on that. - Wait, one more little, oh sorry, sorry, please go ahead. - And besides, people that make a lot of money and have a lot of money, that can afford a lot of things, they like free. So, and they probably appreciate free more than someone that doesn't have as much. So, if we're talking about taking cars off the road and having them to come to the city for nice free things, you know, this additional opportunity to do that and satisfy all of that, that's why I voted for it, yes. Thank you. - Just one little, before you respond to this onslaught of demand for free things, is there funding that comes to DCTA, federal sources I'm imagining, that's attached to ridership? That's a genuine question, I don't know the answer, but is there a funding benefit to increasing ridership? - I'm not prepared to speak on those details here today, but certainly as we get ready for our conversation tomorrow, we can talk about those sorts of things and we can come back to this forum with more details on that. Obviously, the mission of DCTA is to enhance ridership, that's the reason that we're here. We want as many people to use public transit as possible for all the good reasons that you just laid out. And so, if that's an interest of this body, then we can talk more about that in our board meetings and then here as well. - Well, I hope, you know, if there is a funding angle that can, you know, help in the analysis. - Yes, understood. - Okay, thanks for that. - So obviously, FTA wants to see ridership increase across transportation agencies also. - There you go. - I think that's the answer. Okay, so to answer the question about, is free going to be considered in the process? The answer is yes. We heard that feedback from our board in our last meeting that we would need to evaluate or they would like us to evaluate a no fare option or a no fare alternative on the Connect service. And so, we will be talking about that here in the next few months as we lay out this comprehensive operations analysis. We've started with the GoZone fare pricing and then next month, we'll be bringing, layering in GoZone and fixed route and that's where you'll begin to hear about no fare alternatives on Connect. - To clarify, I meant fixed routes broadly, including the A train. - Okay, very good. - You know, if I can strain your patience a little. Is there a conceptual reason in maybe how the compensation works, the contract works, why the same logic wouldn't apply to GoZone? Why would you say we'll look at fare-free for Connect, but not for GoZone? - I expect that could come out in our conversation with the board tomorrow about that idea. I don't know that we've gotten very far into that idea with our board up to this point. And so, it's definitely a good conversation for us to have as we go through this process. So, we'd like to maybe layer that into our conversation tomorrow. - Thanks for letting us keep you at slide six for 10 minutes. - There's only a couple more, so we're doing great. So, this is just a snapshot of, when we talk about potential pricing structures, the concept is that there are, and again, conceptual discussion only, there are fixed pricing models that no matter how far you go, this is what the fare is. There are variable cost models that kind of like an Uber that says, when you go this far, it's this much money. If you go a little bit farther, it's this much money. And then there's a hybrid fare sort of model that says the first several miles, whatever that might be, are a fixed cost, and then beyond that is a variable cost. And that's really what we're talking about when we talk about the idea of trying to entice riders to use fixed routes when it's possible, if that's the most efficient way for them to make their trip. And so here's a snapshot of the multimodal app that's being developed right now. It would be like you see there, a place where proposals of different, multiple legs of a single journey can be evaluated, and then the rider get to decide what is the best route for them. And again, we'll go into more conversation on this in our board meeting tomorrow, otherwise we'll have the folks from VIA on hand with us to talk through that. - I'm embarrassed that I don't already know this, but are we talking about an update to the current GoZone app or a new app that's being designed? - It's an evolution of the current app. - Okay, thank you. - Yeah, I would just, I'm not to be too repetitive, but do you use Google Maps or anything like that for yourself? - Yes, sir, I do use Waze, Google Maps. - So, I mean, you don't need a price incentive to figure out that you want to do the thing that's most efficient for you. - Correct. - Yeah, okay. - Okay, if no other questions, I'm happy to turn it over to Brittany to talk about the modifications from March. Thank you very much, it's very good to meet you, look forward to working with you. - Of course, thank you. - You'll notice I let Paul take the hard stuff, so. The kid, so I'm here to go over the changes that went into effect with the March service change that was instituted on March 14th. I know Mr. Suarez was here earlier this year to present these changes that were proposed and approved at the December 2nd board meeting. I'll start by giving you an overlay with the blue being what the new routes look like, overlaid with the gray that was the previous service. And then I want to show you this next slide that also lays in the UNT shuttles. So you can see even though some of the service was appeared to be cut in the southern portion that is covered by and large by the UNT shuttles, which are also open to the public and an opportunity for them to ride fixed route as well. Before I start going into the individual changes, there's just a couple of points that I want to make as far as trends that you'll see with the changes that we've made to the fixed route. I know Mr. Suarez has talked to you before about the importance of both frequency and on-time performance in building ridership. People won't take the bus if it doesn't show up often and if it doesn't show up on time. So all of the changes that were put in to the March service changes were done with this in mind. How do we take our resources and maximize them on the segments of ridership that have the highest level of ridership so we can get the bus there more often and we can get the bus there more on time? Another point that I want to make is that these changes were meant to be temporary as we work through the process that Mr. Christina just went over. As we look at GOZONE and the A-Train and the Connect service and the shuttles all working together to create a more integrated multimodal system. So these will be on all likelihood changing with whatever the final service plan the board approves later this summer. - Pardon me. - Yes, sir. - Just so I understand, they're temporary in order to meet what temporary objective, what are you solving for? - Well, three things really. Increasing on time performance, increasing frequency and then also working within the confines of the operational shortages that we have right now. Like DART, like Trinity Metro. Yeah, yeah, that's exactly right. Like many, like the school districts, like many across the country, we are seeing a shortage in operators. And so not being able to make those runs, not being able to put out reliable service is one of the driving factors for modifying these services to be able to ensure that we're meeting the demands of the highest ridership portions and we're getting those buses there on time and as frequently as possible. - So if circumstances change or the offering changed and you're able to recruit, you know, if there's a shift and you're able to recruit more operators, is the thought that you might, you know, re-flesh out the roots? - That's certainly a consideration I think the board would look into when making those service decisions later this summer. And this is a plug, if anyone knows any operators, please send them to ride dcta.net, so. - Do we pay as much as the alternate services that an operator might work for? - You know, sir, I don't know the answer to that question. I can certainly get with our HR department and find out where our starting pay measures with both public providers as well as private providers, which is really one of the industries that is siphoning off as more and more of us order from Amazon Prime and we expect those boxes to be there the next day. Those are the kinds of service, the CDLs that we're competing with, so. But I can certainly look into that and we will be prepared to speak to that at our next presentation at this committee. So with that, this is the new Connect route. You'll remember at the end of December, Denton Connect route one was suspended along with the two routes in Lewisville 21 and 22. Another consistent theme across the scheduling is that the routes tend to start a little bit later and end a little bit sooner. And that's capturing the changing shift in ridership patterns that we're seeing as a result of COVID-19. As more folks work from home or have a hybrid schedule, they're not having those normal rush hour periods. We're actually seeing more travel throughout the midday as folks utilize the fixed route, the GO zone and the A train to accomplish more midday tasks. So we've shifted our schedule to accommodate that. Oh, it went backwards. My millennial skills are failing me. So here's the revisions to Denton Connect route two. By shortening this route and taking out the loop component of it, we've been able to increase the frequency of the bus from running once every 60 minutes to once every 42 minutes. So an 18 minute improvement. That's also allowed us to increase the number of routes that we can run during the day from 13 round trips to 15. I'm gonna go through these kind of quickly since they've already been presented. But if you have any questions, please stop me. So this is route three. This one we've been able to improve the frequency on that from every 46 to 51 minutes, depending on the time of day to consistently running it every 40 minutes. This has been able to increase the number of round trips from 14 to 17. And we've also made some modifications to now serve stops at both Serve Denton and Denton County Health. So route four was trimmed down and now has an improved frequency from every 56 minutes to every 40 minutes. And to make up for that cutoff portion there, we've also put in a new Denton Connect route five. This is a new circular route and it has a frequency of every 30 minutes and makes 22 round trips every day. Route six, we've increased the frequency from 50 minutes to 33 minutes. So significant improvements on the frequency there. And that has allowed us to run this route round trip from 13 trips a day up now to 20 routes a day. And then finally revised route seven. This one has a variable time depending on peak period. So it was running every 30 minutes to every 68 minutes, depending on the time of day. Now it runs every 27 minutes and then the last shift of the day between seven and eight o'clock, it runs at an hour frequency. So significant frequency improvements during that midday and early peak period. We've also been able to increase the number of round trips on this route from 22 a day to 24 a day. Yes, ma'am. (mumbling) Okay. - I apologize if this sounds really just kindergarten level question. For a route like this and for the amount of time that you're saying that it's gonna take to get that route, are there, how many vehicles are on the, that's handling this route? Is this one vehicle that's just going around and around? Are there a couple of vehicles? - I'm not sure how many vehicles are dedicated to each route, but I can certainly take that back and I can figure that out from our operations folks and get back to you how many vehicles we run on each route each day. - 'Cause I'm just hearing varying times, take 18 minutes or 30 minutes to go this route. That's, it just sounds almost kind of impossible for one vehicle to do all of that, so I appreciate that. - Yeah, I'll look into it. Depending on the route, it may have different vehicles on different routes, but that's a very good question. I'll find out and we'll definitely get back to your office, yeah, I agree. - Do you have an office? - I do, I have an office. (laughs) - Or carrier pigeon, whatever motive, whatever, yeah. I'll get the same. And so now, oh, yes sir. - Yeah, before we get off this topic. - Sure. - So how were these changes communicated to the drivers and to the general public? - So we have a variety of methods that we use to communicate to the general public. We did a lot of stuff on our website, social media, but we also use traditional methods of public involvement, so putting it in the newspaper. We've also ordered bags that we have a QR code on them that we put on the stops that were closed that folks could take, that would take them to the trip planner so they would understand. But our marketing and communications department utilized all of the resources available to us to make sure that, most importantly, our traveling public knows of these changes. And then the changes to the routes communicated to the operators were done through our partners at NTMC and the close communication that we have working with the HTG and NTMC entities. - This is sort of anecdotal, but from speaking with operators, the version that was filtered to me was, no idea what's coming, show up one day, get the new lefts and rights. It sounds like kind of skimpy to me. I understand there's an intermediary, but I think ultimately we're still responsible for quality control. I'm just sharing that back to you. - Absolutely, and we'll take that feedback back and make sure that we do a better job of conveying any kind of upcoming changes through our channels as well as through NTMC's channels with any future changes we have, and appreciate that feedback. Any other questions on the March service change before I move into the fund that was February? - I just wanted to address, we were talking about pay, and I wanna make sure that David hears that as our new representative on the NTMC board. Trinity Metro has job postings for brand new trainee who does not have a CDL starts at $17 an hour. With a CDL, they start at $20 an hour and go up to $25 an hour. Dart is starting folks with a CDL at $21.13 an hour. And NTMC is starting folks, it looks like with a CDL, at $14 to $17 an hour. - How does that compare? - So there's, yeah, somebody who has a CDL would have an obvious choice to make. So I think if we're gonna address those staffing shortages at NTMC, we might need to address that. - So if we're serious about having a robust system, you need to have operators. If you're serious about having operators, you've got to offer competitive wages. - We'll take that back, thank you, Council Member McGuire. So for the increment weather response and next steps, I like pictures, not bullets on the slide. So I wanna talk you through our response to the two winter storms that struck the North Texas region in the month of February, go over some of our lessons learned and then talk you through some of our next steps. I apologize, Council Member McGuire, it's gonna be almost verbatim what I provided the board earlier this month. But to begin with, I wanna put a little bit of context around how the decision are made in these kind of increment weather events. When it comes to modifying or suspending any kind of service, that's not something that we take lightly. We recognize that we are a public service agency and that we provide critical lifeline services to many of our customers. Providing transportation is always one of our guiding principles and highest missions. When increment weather strikes the North Texas region, particularly icy weather like we saw through both winter storm Landon and winter storm Oakley, safety has to be our highest priority and transit agencies across the region really have to strike a fine balance between providing those critical lifeline services and then keeping the safety of our staff, our operators, and then our traveling public top of mind. So we look at all kinds of things. We look at weather conditions, we look at road conditions, we look at what our partners across the region are doing, what decisions are being made from DART, Trinity Metro, other providers, and those are all considerations that go into making any kind of service determination, augmentation, or suspension. So we take that very, very seriously. So going into winter storm Landon, which did strike the North Texas region the first week of February, we began that Wednesday meeting regular two-hour periods to evaluate the forecast and start taking the preliminary steps needed to ensure the continuity of service when the weather did hit. Our contractors, Rio Grande Pacific, began that evening by lighting the switch heaters, which is the picture of the rail on fire, which I think is a very cool picture. Those will keep the rail switches from freezing and allow us to continue running A-train operations during prolonged periods of below freezing temperatures. We also had crews out that evening laying out biodegradable ice melt at the DCTA stations and bus stops and sidewalks and parking lots, as well as provided our operators with biodegradable ice melt on their vehicles to spot treat as necessary. That evening, we did make contact with all three of our member cities to evaluate their needs during the incoming inclement weather. We worked closely with the city of Denton on their request to provide shuttle services to the emergency warming centers and shelters at our Daily Bread and across the city of Denton. For the city of Lewisville, we provided a warming bus on standby at one of the rail stations in case they had any emergency needs for warming centers or evacuations like they experienced in February of '21. And then Highland Village politely declined any requests for assistance. So moving into Thursday, we started meeting regularly at 5 a.m. in the morning to evaluate road conditions and start making determinations on service. Our partners at VIA requested that we go ahead and suspend GoZone service. And this was done in accordance with similar decisions made by VIA-provided service at Trinity Metro in the city of Arlington. We did decide to continue running the A train and the Connect service, albeit on a Saturday schedule. And then pair transit service and the emergency shuttle services ran as normal. Moving into Friday, things really got icy. Our friends at DART went ahead and made the decision. And I worked at DART for nine years and never saw it happen to suspend all service on both the train and the buses. And with that decision, that lack of regional connectivity, we made the decision to go ahead and suspend A train operations. We planned on running a limited Connect service, but as road conditions deteriorated Friday morning, operators had a really hard time getting to work and of course, putting their safety first. We went ahead and made the decision to cancel Connect service and shift those services onto providing those critical lifeline services. So those operators were deployed on the emergency shuttle services for the city of Denton and then primarily on our paratransit services. And on that Friday, which was arguably the iciest, most dangerous day, the day that DART shut down, our operators took nearly two dozen people to their dialysis appointments. And I know that two dozen people for some of the larger agencies doesn't sound like a whole lot, but to me, that's 22 people that could have potentially suffered life-threatening ramifications had we not got there. And it's a point of pride for me that we got those 22 people there and I am so proud of our operators and our staff for getting those 22 people where they needed to go. That's why we get up and come to work every day, is to make sure those 22 people have the services they need. So the shuttles, the UNT shuttles were suspended 'cause campus was of course closed. Via the GoZone service also did not run on Friday. Moving into Saturday, we had a little bit of break from the ice. It was still a hard freeze in the morning, which made getting operators to work to mark up a little bit difficult. But this was GoZone's ability to really step up and shine and demonstrate their flexibility. As the roads began to thaw, as the temperatures did increase throughout the day, we were able to launch the GoZone service beginning at noon and running until seven o'clock when the roads started to refreeze. And in that time, we completed nearly 1,100 trips on the GoZone service. By Sunday, we were back to normal, all modes operating regularly and we all took a big sigh of relief, which lasted for about two weeks until winter storm Oakley showed up. When that storm struck at the end of February, very similar protocols began meeting every two hours, reached out to the cities, again, got the request from the city of Denton to provide the emergency shuttle and warming center, which we were able to accommodate. As the ice began to fall that Wednesday afternoon, UNT made the decision to cancel classes early, so we went ahead and suspended the UNT shuttles. And then as the roads really started to slick as the sun went down, we went ahead and suspended the GoZone service at 5 p.m. But the A-Train and the Connect service did finish their regularly scheduled routes for that day. Moving into Thursday, we also had the request from VIA to suspend the GoZone service, again, in conjunction with similar decisions that were made at Trinity Metro in the city of Arlington. We had planned that Thursday to run a regular Connect service, albeit started a little bit later at 10 a.m. to give the roads an opportunity to freeze, which they did not unfreeze. And so we did have an operator shortage and once again made that determination that those resources would be better shifted onto providing those emergency services, those lifeline services. And then we did continue Route 7, which was still showing some ridership as well. The A-Train operations also continued that day. By Friday, luckily, this was not as long in duration as Winter Storm Land, and so by Friday, we were back to normal and everything was running as per usual. And we tried to do our best, and I think we were very successful in communicating these changes frequently to the board member, again, I apologize for all the emails, the traveling public, and then to the cities as well. So as we're moving into March now, and as we've already seen this week, hopefully we're moving out of winter weather season and straight into tornado season. So, but we're not waiting until next winter to already start dissecting what we've done with our winter weather response. We've already been meeting both internally and with our partners to evaluate our lessons learned and start thinking about next steps. A few things that we learned from the two opportunities February gave us to respond to winter weather is the value of making decisions on a day-by-day basis. There's a saying here in Texas, if you don't like the weather, wait 15 minutes and it will change. And that doesn't stop during winter weather events. So the ability, as much as some of us were a little cranky and uncaffeinated at those 5 a.m. meetings, the ability to meet every day, to meet with that kind of frequency allowed us to be flexible and nimble and make decisions as they were presented to us. And so short-term decisions, meeting regularly, standard operating procedures were definitely one of the lessons learned, the best practice takeaways that we had. Another one is being able to communicate regularly with our partners. So including VIA, including Rio Grande Pacific, including NTMC in our decision-making process allows us, again, to be flexible, to know what their limitations are and then to respond as appropriate. And then the last best practice lesson learned is communication, communication, communication. I cannot overstate the importance of communicating, whether it be with this council, whether it be with our partners at our different agencies, but especially with our traveling public and letting them know what's going on and what goes into the decision-making process, that these decisions aren't made in a vacuum. As we look towards the next winter season, we're already starting to take a look at things that we could do better. So how can we start being proactive in a way that allows us to continue operations as much as we can, again, always with that safety component top of mind. And then we also know that the City of Denton has been interested in having conversations with transportation needs for individuals to emergency warming centers and shelters, even when it's not icy. So those are conversations that we're happy to engage with with the city as we start planning for next February. So with that, that's really all I have on the winter weather response. And if there are any questions, I'm happy to answer them. - Great performance, I mean, with the service. - Yeah, and I said this at our last board meeting, but I wanna say it here as well, that thank you to DCTA staff. I know that our staff here at the city also did outstanding work during both of those storms to keep folks safe and maintain those essential services. It was a tricky situation. Safety always comes first, obviously, and that's a balancing act. No, you don't want vehicles on the road unnecessarily, but as you said, there are folks who need to get to dialysis. And I think that y'all did an excellent job of balancing those concerns. - Thank you, ma'am. - All right, well, with that, that concludes our presentation. Thank you again. - No, don't leave, don't leave. - Aw, man. - Any questions, sorry. I figured, you know, DCTA is on the slide, therefore we could ask anything related to DCTA. I hope that's right. - That's fair game. - We like long meetings here in Denton. - I was wondering, Paul, could you maybe share with my colleagues a little bit about what's going on with the A train? Because there are so many exciting plans in the works for the A train with Corinth and Carrollton and positive train controls and maybe double tracking. - Sure, glad to. So in our last board meeting, we provided, I provided a briefing on opportunities to enhance the value of the A train, that really the value that the A train provides to our member cities and our broader Denton County community. The basis of the presentation was, we have opportunities for new member cities, potentially in Corinth. We have opportunities to be in further partnership with Dallas area rapid transit to get the A train down to Carrollton. And we have opportunities to partner with the private development community, as well as leverage our own land resources to do transit oriented development. All three of those different things we believe would lead to increased ridership on the A train and again, causing it to be of greater value for our communities. And so the vision that was set forth in that meeting was the opportunity or the need really to evaluate all the different infrastructure components that are required to make those things happen. And that's enhanced capacity primarily through, by increasing speeds, we can increase speeds and capacity by doing things like improving our positive train control system, which is the automated safety overlay that sits over top that train to make sure that it operates within its boundaries as safely as possible. Also the addition of track segments in different places be a siding so that two trains can pass one another or double tracking so that two trains can operate in the same space simultaneously as they go in opposite directions. The old, if a train leaves station A at this time and a train leaves station B at this time, where do they meet? That's the kind of analysis that we're talking about. And so the board provided signals that it is interested in moving forward with understanding what that would take. And so we've been in conversation with our consultant partners who have evaluated different pieces of that puzzle over time. Like what would it take to add a station at Corinth and not degrade performance? What would it take to enhance our PTC system? But we have not done that evaluation altogether because the system of the railroad depends on all those different pieces. And if we wanna really determine what are the most cost effective ways to achieve those outcomes, we should look at them altogether. So since that board meeting had a call with our consultant team as recently as yesterday to continue to refine the scope of services that we can bring back to our board here in the near future to say, here's a path forward should we choose to take it. So thank you for the question. - I have several questions about via GoZone. If I can hold you a little bit. - Sure. - Do we have safety expectations in our contract? Are there metrics about accidents and frequency and so on? Any kind of service level definition related to safety? - I would like to be able to really digest the contract with these sorts of questions in mind. - I'll give you the questions. You do not expect me to answer something like that. - Okay, great. So safety metrics. - Okay, yeah. - And then obviously the rejoinder is how are we doing? How's that looking? Do we have average wait time expectations with service level metrics in our contract and how are we doing? - Okay. - And last one I wanna in that vein is do we have specific service level metrics related to having rides available for disabled customers? In other words, how many times do we provide a vehicle that is, that can take someone with a wheelchair or a walk or whatever when it's asked? - Right. - Is there a correctly equipped vehicle available? And obviously these questions are coming from a concern that maybe we're not meeting those standards or that there aren't standards built into the relationship. So, you wanna know, I wanna know. - Yeah. - We'll talk about it when-- - So we will in the conversation that we'll have tomorrow at our board meeting, we are gonna talk about performance metrics like average wait time, seat unavailability, those sorts of things. We'll have a conversation with the board about what are the inputs that can be had to improve those things. And so we can certainly come back to this body with more details around the more robust set of metrics that you've just laid out. - I'll tell you, the driver safety thing, if the anecdotes bear out, that's a really serious concern. If there's something systemic in the way that they're compensated or managed that is leading to a problem there, I'm gonna stay from Missouri, you'll tell me, but if that is a reality, that's gotta go to the top of the list, right? - Understood. - Okay, that's great, thank you very much. I really appreciate you coming in, sharing with us. - Oh, please. - I wanna preface this by saying that I was on Nextdoor, you know the Nextdoor app? So there's all kinds of things that are going on. But one of the questions that came up and it seemed a bit petty. And as a city council person, I always wanna just jump on there and say something, you know, to these people. But I know that it has to be in a way that, you know. So I just choose not to indulge. But the question came up and the concern in the, and I'll use this term loosely, the pettiness came up as to why the GoZone cars do not have the State of Texas registration tags on them. And so they're concerned that the vehicles may not be safe as if they were not, you know, that's serious, but it was just kinda, you know, a first thought that, well, what does this matter? But it does if we're talking about people riding in State of Texas examined vehicles, you know, we have to have our cars inspected before we get our registration. And if we're seeing a lot of cars coming out of Florida or wherever these tags are from that's, they didn't say that. I'm adding that particular part on there that it's a safety factor as well. So Mayor Pro Tem, I appreciate you bringing that conversation up, you know, that topic up of safety. This also goes along with that. How can we assure our riders that they are in the safest vehicles possible, especially by having those vehicles registered with the State of Texas? I don't think I've seen one that shown that it was a Texas registered vehicle, which thereby means that it's been inspected and, you know, and allowed to be on the road. - Understood. - Thank you. - Yeah, you know, if you can, you know, if the general safety issue is substantiated, then I'm sure there are many tools you're gonna want to look at. How are they recruited? What are the standards? What's the training, right? So obvious management stuff. Yeah, thank you so much. - Okay, thank you. - All right, we're on to MC22-08 staff report. (door thudding) All righty, well, thank you very much for having me to allow me to do the staff report today. So the first thing that I wanted to start off with, I know last month we introduced Brett, our new deputy city engineer. Trevor also is new to our department and is taking the position that Rachel Wood previously held. And so I wanted to give Trevor a chance to come up and introduce himself, talk to y'all a little bit about his different roles he's played within the department. And we're gonna start off with that. So Trevor. - Good morning, thanks for having me. So my name's Trevor Crane and I'm the Deputy Director of Capital Projects. I've been with the city almost three years now. I originally came in October of 2019 as a project manager in the Capital Improvements Department. Close to about 10 months ago, I was promoted to the Public Works Inspections Manager, and I've been in that role since, or I guess up to about a month now I've been in this role. So I'm excited to move into this role. I worked with Rachel very closely when I was a project manager in that department. I was involved in a lot of those policies and procedures that we built. So I'm excited to be back with that team and keep moving this forward. - Welcome. - Thank you. - Thank you, Trevor. The unfortunate part is we now have a Public Works Inspection Manager position to fill. But I am glad to have Trevor in the position that he's in. He's doing a fantastic job already. So the next item that we wanted to go through was the Parkway Street and then the Locust Elm intersections. I know Mayor Pro Tem, I believe you asked for some additional information. We do have individuals from the Traffic Operations Team present today that helped work with us on this. So specifically, you asked the question about when the traffic signal analysis was completed, when the signals were brought down, and kind of what that process was. So I'm gonna paraphrase, but of course you have the backup in your information. So June 2019, staff did construct a traffic signal warrant analysis and determined that they thought it was best to remove the signals at those intersections. And that deactivation occurred in January of 2020. And then it kept in that same operation until December 8th of 2021. During that time frame, that intersection operated with a side street stop on Parkway. So if you can envision, you're only stopping at Parkway at both Elm and Locust. So there was free flow of traffic traversing up and down Elm and Locust. October 8th, our team, along with James Andrews and Danny Kramer, Traffic Operations, Street Operations, worked through to install that all-way stop. So now envision that now we have stop signs both at Elm and Locust. Then James actually worked to install the red flashing beacon. And that's actually just at the intersection of Elm. What we found, and James did some of this evaluation, was folks that are coming northbound on Locust, they've just come through the intersection at McKinney, so they're not accelerating as quickly, and they're noticing that there's a stop sign almost immediately. Folks that are coming down Elm Street, unfortunately, they haven't had a signal since 380. They could have picked up a decent rate of speed, and we're not always noticing those stop signs that were installed at Elm. So red flashing beacons are located at that location. We did work with PD to assemble crash data, and we're working to complete all of that. I know we mentioned that we're gonna have that crash data available. Nathan has some preliminary, which he just stepped out of the room, preliminary data. One of the things that we're working through is collecting all of that so that we can provide that information to you. So something that we're continuing to work with PD on. We ourselves, because we're now housed right at the corner of that intersection, have seen several crashes. The data is not exactly adding up with the information that we've seen. So we're working through that so that we can bring that back to the committee. And then, of course, we're continuing to evaluate the operations. I do feel like from the current perspective that we see that the all-way stop is working in a much better fashion than just the stop in the direction of Parkway. So wanted to bring that forward. Of course, as usual, we provide you the information where that was provided in previous Friday reports. There was one in October that we provided information about the warning signs and the stop signs. Any additional questions on that item? - Yes, I have one question. - Sure. - I travel that, I travel those roads 'cause I live kind of on the north side. Are there any warning signs to prelude the stop signs that are going south on Elm? Do we get a warning back here that there are stop signs? - Well, I travel that every day, too, and I'll have to be honest with you. I don't know that I've ever noticed that. James says yes. James, would you like to come up and speak where those locations are? (man speaking faintly) - Okay. - The stop ahead signs, that's what they're called. - Yes, ma'am. So sounds like they're stop ahead signs. I would assume they're several hundred feet from the intersection north of the intersection that actually tell people that there is going to be a stop sign ahead. And we can look at those exact locations, too, if you'd like to know this. - Well, I'm gonna drive. - Okay. - I gotta go that way anyway when I leave here. - Well, great. - So I'm gonna come back on Elm because my next meeting is over across the way at your building. So I will see that for myself because I don't have it in my head as to whether or not I'm told that there's a stop sign. - Sure. - Ahead, other than then seeing the flashing lights. - Absolutely. - So, yeah, I'll do that. - Okay, great. Wonderful. So on that item specifically, hopefully we've addressed the questions. The only thing that we have still we're working through with PD is just that crash data specifically on the Parkway and Locust and Parkway and Elm. Like I mentioned, Nathan is working with the police department to continue to collect all of that in a fashion that we can present that information to you. So we will bring that crash data back at the next meeting. The next item that was a part of our staff report from last month was to get an update kind of on, and I think it was quoted saying kind of what's going on in the Dearwood, Kingsway, Kingsrow area. And so we are working with the development services team to provide you information that shows you the existing configurations in that area, what the mobility plan now shows for that area, and then specifically what the development was required to do in that area, or asked to do in that area as a part of that PD. So that'll be a presentation that'll be brought back at the April meeting. Is there anything else specifically that you'd like for us to drill down on that individual item? Okay. - I just have another question here. - Sure. - Speaking with the State of Texas group and connecting with our city, I mean our development issue that we had over there, I know that one of the primary concerns was whether or not that frontage road would be ready, you know, when this development came through. And I think that that was one of the things that it was highlighted pretty heavily, you know, at that point. And as we were having that conversation, I was trying to connect whether or not if we did the service to that community, and trying to figure out the timeframe that a frontage road would be put in, versus the timeframe when the development would be there. So the issue is still there, because some of the conversation came through as to the lot size and all of that other stuff. So would you all look into that? You know, how closely would the development be done versus being able to have a true frontage road? - Sure, we can absolutely bring that forward. I will mention to you, Mr. Polster made that as a part of his presentation. You saw where they're just in the very beginning stages. So those frontage roads, it's gonna be sometime before those are constructed. What you will hear in the presentation is that the developer, actually myself, TexDOT, several on our staff, and TexDOT Dallas district office, along with the planning department, development services team, coordinated with TexDOT to see what could be constructed since it will be sometime from the frontage road. And that's what some of the options were that Ms. Wyatt presented at that meeting. So we can bring that forward so you can kinda understand what the conversations were that we had with TexDOT. That's gonna be a similar conversation anywhere along the Loop 288 corridor from 380 all the way to 35, and really actually even to the west side of 35, where what we call the paper clips are until Loop 288 west is connected. In that particular area, because it's a controlled access freeway, direct connection because folks are driving 60 miles per hour is prohibited. So we're not going to, along with ourselves and TexDOT, allow connection directly to Loop 288. So that's why some sort of frontage road will be constructed when folks need to do so. So we can bring that back to you, no problem. So timing on the actual construction of those frontage roads is quite a ways out based on Mr. Polster's report. The next question that was asked was specifically related to Southeast Denton, seeing the trucks go through to get to Duncan. And I know this is something that Mr. Kramer led the charge on with help from some of our engineering staff and then also our transportation planning staff. I think Council Member Byrd, this is one of the ones that you brought forward asking questions about trucks going through to get to Duncan and some signs that might need to be installed. Traffic operations through James' team actually did observe the street sign and determined that it needed to be replaced. So that happened on March 14th. And then you can also see additional information that was provided in the Friday report in December of 2021. So I think that from the street department, public works and traffic operations department, they feel as if they've installed the additional traffic sign measures in that area. And I'm not aware of any additional concerns that we've received in that area at this time. Okay, okay. And then of course, the last question that came up was kind of talking about the citywide speed study. Nathan is leading the charge on the citywide speed study for our team. And so I would just mention that we're currently in the data collection phase. That's the exciting part 'cause we're getting all of the data collected. Nathan actually did a fantastic job of actually developing a GIS system that shows actual points of where the data is gonna be collected along with kind of an overview that shows the information that will be collected. You can see in the report that traffic speed and volume counts are being conducted. I mean, he's also looking at crash data and several other measures so that when we look at the speed of the particular roadways, there's more data that's going into those conversations in that collection. We anticipate that that will be completed by late May. So typically you wanna collect not when it's spring break and not when school's out of season. So right now we're working to collect the data from now until basically late May. Once that data is completed, then our staff along with transportation planning in development services team will work to coordinate and evaluate all of the data to draft a speed study report that will be presented not only to this committee but then also to city council in that late summer, early fall timeframe, August, September to get direction from council. And of course we completed several Friday report items on speed reduction. So I wanted to make sure you saw that that was in the June and the July Friday reports. And then with that, we are gonna move over to our matrix that Ms. Logan has provided for us. So on the first item, which is the construction of Bonnie Bray and the timing, we believed that we had addressed that concern at the February meeting. But as of today, I think that based Mayor Pro Tem on your feedback, you'd like to hear a reoccurring conversation just to give a brief status update as a part of the overall report at each one of the mobility committee meetings. - Yes, and with specific focus on the torn up area kind of from Oak Street South there. And I wonder if you'd be able to get something into a Friday report before our next mobility committee meeting, even two or three sentences. It just helped me out, you know, try answering these questions, you know, when you have a slightly annoyed person behind a door that you've knocked on and they're trying to close it, you know, that's the kind of answer I need. - Sure, we can put something, we can work to even maybe try to get something in the Friday report this week, if not next week. We actually have a change order that'll be coming through the system. It goes to PUB on Monday and to council on April 5th. That'll talk about some of the improvements that are gonna be made to expedite some of the pavement repairs in that area. So definitely something we can bring forward. We can, Trevor and I can work on making sure that that's in a Friday report. So that's not an issue at all. - Most recent email I got about that from a constituent referenced a car-sized pothole. I don't know if you got that one, yeah. - Well, if you'll continue to bring those to our attention, you know, we received word yesterday from TXOT about some concerns on their driveway entrance because that's one of the only ways in and out of their facility and they drive larger trucks through that area. If those concerns are brought to our attention, whether it's through the project manager, engaged it and et cetera, we'll be happy to have the contractor go out and evaluate those concerns. I know there's been several that Danny assisted with during some of the ice and some of the weather conditions. So if we're aware of those, we'll work to address them. Obviously we understand the roadway needs to be repaved. We're working to complete the utility. The next item on the Parkway Locust, I'm gonna leave that on the overall agenda because I wanna make sure that we bring back that crash data. Nathan's gonna work to collect that and present it to you in a manner that we can share that information. The Kingsrow, we already discussed that. That'll come back at the April 20th meeting. I guess Council Member Byrd, would you like for us to leave the Southeast in the neighborhood until you have an opportunity to discuss with constituents if they're still concerned in that area? - I'll be speaking with them on Monday at their neighborhood meeting and we'll have that conversation. By the way, I did notice a nice brand new Dunkin' sign up there off of... When you cross over Dallas Drive, I think it's called Shady Oaks or something like that. I never could get the name of that street right. But I did notice a brand new sign, but I did not notice any signs notifying drivers of larger vehicles that this is not a through street area. I need to check with that. So I'll talk to them on Monday and I'll get back with you. - No, that'd be fantastic. Actually, if you have that opportunity to speak with them and then could provide that information to us, we'll make sure that we address it at our next mobility committee meeting. Yes, ma'am, thank you. And then of course, the citywide speed study, we've given you an update. Is that something that you still want us to continue to give you a monthly update on or do you feel like since we're in the middle of data collection, we can wait until the time that data has been collected and of course, we're ready to kind of do that draft plan or is that something you're wanting us to continue to bring back to you? - Comments, sorry. - I think I can wait. - How about you, do you need a continuous update or ready to wait until there's something to report? - At least I could be able to let my constituents know that we're working on a speed study. - Yes, ma'am. It's gonna be several months to collect that data so we don't anticipate even having that data in until late May. So we wanna work through the school year because that's when normal travel patterns are happening and so it'll be late May before Nathan has that data in. - I'm happy to wait until there's something to report. - Okay, perfect. - And also-- - Without objection. - Excuse me, sir. Also, is this speed study, is it including that South Indian version of the evil ways that you've renovated? - There will be roadways that are included. Keep in mind that this is only for roadways and that's something we could report on, but this is only for roadways where posted speed limit is not 30 miles per hour. So there's specific lists that were provided previously that we evaluated and then Nathan also evaluated additional roadways that he wanted to study based on conversations that we had or questions that come in maybe from a speeding perspective, et cetera. So definitely roadways that may be traversing that area, but not specifically residential streets in that downtown area. So with that, that is all that we currently have on the staff report. Is there anything additional that either one of you would like to add for us to bring back at the April meeting? - Yes, I'd like to add a street to the report. It's gonna be Swisher Road that's off of Shady Shores Road. Yes, it's in the city of Denton. - Portions are and portions are not. - Right, so this particular portion is there beautiful homes on the street, but the road is not conducive to what they need right now. - Okay. - Some culvert issues, drainage, and I've driven out there and spoken with homeowners in that area. So that road doesn't have any lights. Pavement is worn down. So we'll just have to give that road some attention. - Okay, well we can look and see if it's scheduled or planned as any part of any bond package or upcoming CIP. If not, we can work with Danny's. Okay, perfect. So what we'll do is bring back to you what phase of 2019 that's in and then also when that is scheduled and what the anticipation. So that'll be a very easy question to answer. Absolutely, we can do that. I don't have the map in front of me, but we all have this handy dandy PDF that we keep on our desktop so that we can answer those questions. So we absolutely can bring that back to you, no problem. That'll be very simple. - Councilmember McGuire, anything you want to add to the list? - I'm going over my long list of things that I'm thinking about, but I don't see anything currently that's relevant here. - I think we've done it. - Well, wonderful. Thank you very much. Well, we look forward to bringing back these future items to you and look forward to hearing from you about the Southeast Denton area. And then with that, I guess we're done with the staff report. - All right, thank you. - Thank you very much. - All that remains is concluding items. Does anyone have any concluding items? Seeing none, we are adjourned at 1039.
Back to Meeting