1 00:00:00,000 --> 00:00:08,300 Good morning and welcome to this meeting of the Mobility Committee of the City of Denton. 2 00:00:08,300 --> 00:00:09,900 We have a quorum present. 3 00:00:09,900 --> 00:00:16,100 We're convening at 9.02 and we'll begin with our items for individual consideration, starting 4 00:00:16,100 --> 00:00:20,880 with item A, which is considering approval of the minutes for the September 8th, 2020 5 00:00:20,880 --> 00:00:24,500 meeting and will entertain action. 6 00:00:24,500 --> 00:00:26,500 I will move approval. 7 00:00:26,500 --> 00:00:27,500 Second. 8 00:00:27,500 --> 00:00:28,500 We have a second. 9 00:00:28,500 --> 00:00:29,500 I'll second. 10 00:00:29,500 --> 00:00:30,500 Second. 11 00:00:30,500 --> 00:00:31,500 All in favor? 12 00:00:31,500 --> 00:00:32,500 Aye. 13 00:00:32,500 --> 00:00:33,500 Aye. 14 00:00:33,500 --> 00:00:34,500 Minutes are approved. 15 00:00:34,500 --> 00:00:39,440 Moving on to item B. Receive a report and hold a discussion regarding updates from 16 00:00:39,440 --> 00:00:41,780 the Denton County Transportation Authority. 17 00:00:41,780 --> 00:00:44,500 Well, thank you. 18 00:00:44,500 --> 00:00:45,500 I am Nicole Recker. 19 00:00:45,500 --> 00:00:50,460 I'm the Vice President of Mobility Services and Administration here at DCTA. 20 00:00:50,460 --> 00:00:53,260 And I have a lot to update you. 21 00:00:53,260 --> 00:00:54,260 Good to see you as well. 22 00:00:54,260 --> 00:00:59,740 So we've got a lot of updates to share despite COVID. 23 00:00:59,740 --> 00:01:04,420 We've got a lot of things going on and I'm excited to give everybody an update. 24 00:01:04,420 --> 00:01:10,180 So I did want to provide an update on our COVID-19 procedures. 25 00:01:10,180 --> 00:01:14,940 So we are still the only transit agency in Texas without a positive operator case of 26 00:01:14,940 --> 00:01:19,340 COVID-19, which I always like to say this is not a time to boast. 27 00:01:19,340 --> 00:01:25,380 However, that designation does indicate how above and beyond we are going to make sure 28 00:01:25,380 --> 00:01:32,300 that we are ensuring the safety for our passengers, our operators, and our staff. 29 00:01:32,300 --> 00:01:36,900 Since our last meeting, we have actually installed touchless hand sanitizer units on all of our 30 00:01:36,900 --> 00:01:37,900 vehicles. 31 00:01:37,900 --> 00:01:43,100 And so those are up and running and have received very positive feedback. 32 00:01:43,100 --> 00:01:47,260 We also have a dedicated web page that's been detailing all of the efforts that we have 33 00:01:47,260 --> 00:01:49,020 put into place. 34 00:01:49,020 --> 00:01:53,340 We've created a welcome back riders guide, which is like a quick download document so 35 00:01:53,340 --> 00:01:59,420 that you can see exactly what all of the precautionary measures we've put into place are. 36 00:01:59,420 --> 00:02:02,060 And I mean, obviously, ridership is down due to COVID. 37 00:02:02,060 --> 00:02:07,260 And so we have been promoting a ride safe, stay safe campaign, kind of reinforcing the 38 00:02:07,260 --> 00:02:13,440 return to transit, including some of those behind the scenes footage and photos to kind 39 00:02:13,440 --> 00:02:16,540 of show people exactly the measures that we're going to. 40 00:02:16,540 --> 00:02:22,340 We're also having conversations with the North Texas Council of Governments to talk about 41 00:02:22,340 --> 00:02:28,020 kind of regionally what would it look like to return to transit and what are some of 42 00:02:28,020 --> 00:02:32,140 the efforts that we could do from a regional perspective that would help increase ridership. 43 00:02:32,140 --> 00:02:40,100 So DCTA recently conducted a COVID-19 passenger survey where we are collecting data from folks 44 00:02:40,100 --> 00:02:44,700 asking them when they returned to transit, if they haven't returned to transit, what 45 00:02:44,700 --> 00:02:48,900 are those reasons, you know, do they feel safe on DCTA? 46 00:02:48,900 --> 00:02:53,380 And so we just closed to that survey and we will be looking at that data and we hope to 47 00:02:53,380 --> 00:02:56,380 be sharing that data with our board in January. 48 00:02:56,380 --> 00:03:02,620 So obviously, a lot of activity is going on to make sure that we're ensuring the safety 49 00:03:02,620 --> 00:03:06,020 of our passengers, our operators, and our staff. 50 00:03:06,020 --> 00:03:11,460 In the past, I've given the Mobility Committee an update on the agency's transformation initiative, 51 00:03:11,460 --> 00:03:14,340 and we've made quite a bit of progress. 52 00:03:14,340 --> 00:03:20,740 And so as a reminder, the transformation initiative is an agency-wide study that's board-led that 53 00:03:20,740 --> 00:03:27,140 will develop a cohesive vision for DCTA's future, looking at improving operations, addressing 54 00:03:27,140 --> 00:03:33,700 perceived concerns, responding to evolving markets, technology, and consumer preferences. 55 00:03:33,700 --> 00:03:37,940 So that initiative began in August of 2020. 56 00:03:37,940 --> 00:03:43,460 And so we have been rapidly working on that with Accenture, who is who the board appointed 57 00:03:43,460 --> 00:03:45,460 to conduct that analysis. 58 00:03:45,460 --> 00:03:50,420 And we hope to kind of close out that study by the end of the year. 59 00:03:50,420 --> 00:03:55,380 We actually have a specially called board meeting next week on November 5th, where Accenture 60 00:03:55,380 --> 00:03:59,900 is going to present kind of their current state analysis findings, as well as their 61 00:03:59,900 --> 00:04:02,420 future state recommendations. 62 00:04:02,420 --> 00:04:07,020 And it's those future state recommendations that's really going to kind of inform truly 63 00:04:07,020 --> 00:04:08,740 the future of DCTA. 64 00:04:08,740 --> 00:04:13,660 And so at that specially called meeting, the board will also workshop those future state 65 00:04:13,660 --> 00:04:19,580 recommendations so that they can kind of create a priority list and a list of what efforts 66 00:04:19,580 --> 00:04:26,700 need to be focused on each fiscal year, because obviously there is a price tag associated 67 00:04:26,700 --> 00:04:30,820 with some of the modifications that Accenture might be proposing. 68 00:04:30,820 --> 00:04:35,540 And so we're quite excited to kind of see that final report and to be a part of that 69 00:04:35,540 --> 00:04:39,620 board discussion as they prioritize those recommendations. 70 00:04:39,620 --> 00:04:45,120 As part of that transformation initiative and as part of board direction, staff has 71 00:04:45,120 --> 00:04:51,180 been looking at leveraging our mobility as a service or MAS contracts that we've had 72 00:04:51,180 --> 00:04:57,580 under contract, we've had 32 contractors under contract for about two years. 73 00:04:57,580 --> 00:05:05,160 So staff conducted a mini RFP or a task order within those existing MAS contracts to identify 74 00:05:05,160 --> 00:05:10,580 providers who could deliver on demand service and mobility in member cities as well as contract 75 00:05:10,580 --> 00:05:11,580 cities. 76 00:05:11,580 --> 00:05:16,420 And so really the MAS contracts are on demand services. 77 00:05:16,420 --> 00:05:22,540 We received bids back from several of those providers, but the board approved the staff's 78 00:05:22,540 --> 00:05:27,060 recommendation of awarding the contract to spare labs and to via. 79 00:05:27,060 --> 00:05:31,420 So we are still in conversations with spare labs and via about what type of on demand 80 00:05:31,420 --> 00:05:36,540 services we could launch in our member cities as well as maybe in the future in our contract 81 00:05:36,540 --> 00:05:37,540 cities. 82 00:05:37,540 --> 00:05:42,380 But again, we're really awaiting the discussion on November 5th from our board, reviewing 83 00:05:42,380 --> 00:05:46,940 those future state recommendations before we start working with these providers to kind 84 00:05:46,940 --> 00:05:49,260 of remodel service delivery. 85 00:05:49,260 --> 00:05:54,580 So we've had many discussions at a board level, it could be where we modify our fixed route 86 00:05:54,580 --> 00:05:58,180 some and then we layer on demand services on top of that. 87 00:05:58,180 --> 00:06:05,100 Maybe that looks at kind of expanding the service area where we provide service. 88 00:06:05,100 --> 00:06:09,260 There's a lot of different options, and so we're really just not ready to pull the trigger 89 00:06:09,260 --> 00:06:14,620 until the board provides us with some direction based on those future state recommendations. 90 00:06:14,620 --> 00:06:17,500 But we really feel like that conversation next week is going to open the door for us 91 00:06:17,500 --> 00:06:22,300 to have further discussions with spare labs and via about providing that service. 92 00:06:22,300 --> 00:06:28,780 So I would say hopefully spring of next year we would be looking at conducting a service 93 00:06:28,780 --> 00:06:34,300 change where you would see quite a substantial modification in how DCTA is delivering service, 94 00:06:34,300 --> 00:06:35,300 which is really exciting. 95 00:06:35,300 --> 00:06:41,460 I do want to just give some updates, obviously with COVID we're not getting face to face 96 00:06:41,460 --> 00:06:46,500 as often as we were before, but our social service agency roundtables are still being 97 00:06:46,500 --> 00:06:49,500 held, they're just being held in a virtual setting. 98 00:06:49,500 --> 00:06:54,820 Our meeting in Louisville was yesterday, we have a Denton-focused meeting tomorrow at 99 00:06:54,820 --> 00:07:01,300 9 a.m., so if anybody is interested in attending, anyone is welcome to attend. 100 00:07:01,300 --> 00:07:03,980 It's okay to have your assistant join the meeting. 101 00:07:03,980 --> 00:07:08,460 Yeah, well I do have a little assistant, so thank you. 102 00:07:08,460 --> 00:07:13,900 I also wanted to let you know that our community outreach has changed quite a bit just since 103 00:07:13,900 --> 00:07:19,180 COVID, but that has not stopped us, so we have actually created a community education 104 00:07:19,180 --> 00:07:24,900 resource webpage that is full of coloring pages, activity pages, story time videos, 105 00:07:24,900 --> 00:07:30,740 links to virtual tours that are educational, links to DCTA's educational outreach programs 106 00:07:30,740 --> 00:07:35,740 like Operation Life Saver and Rail Ready, and new content is updated regularly. 107 00:07:35,740 --> 00:07:44,780 And so DCTA has been partnering with schools, teachers, parents, daycares, all sorts of 108 00:07:44,780 --> 00:07:50,380 different organizations to be able to use that content either with at-home instruction 109 00:07:50,380 --> 00:07:52,460 or even in classroom instruction. 110 00:07:52,460 --> 00:07:58,620 And so that has kind of led to some really great partnerships and abilities for us to 111 00:07:58,620 --> 00:08:04,580 kind of still execute our outreach strategies, but just in a different way. 112 00:08:04,580 --> 00:08:11,540 So part of that outreach strategy also is focusing on low-income outreach, and we have 113 00:08:11,540 --> 00:08:19,140 been putting together packets of information, so including copies of like activity pages 114 00:08:19,140 --> 00:08:24,660 and crayons, disposable masks, and information about DCTA, and we've been hand-delivering 115 00:08:24,660 --> 00:08:32,660 those to interested participants as well as like neighborhood associations. 116 00:08:32,660 --> 00:08:38,100 We've been focusing in Denton specifically on the Denia area and the Sedna areas to kind 117 00:08:38,100 --> 00:08:43,220 of hand-deliver those materials, so that one, it gives, you know, kids, I mean, trust me, 118 00:08:43,220 --> 00:08:46,380 I understand what it's like to have a little one at home while you're trying to work or 119 00:08:46,380 --> 00:08:47,380 do other things. 120 00:08:47,380 --> 00:08:52,620 And so those activity pages, you know, certainly can kind of keep the kids busy. 121 00:08:52,620 --> 00:08:57,860 We also realize that not everyone can, you know, afford to purchase PPE in order to do 122 00:08:57,860 --> 00:09:02,300 the things that they need to do, and so we've provided some disposable masks in those bags. 123 00:09:02,300 --> 00:09:09,460 And so if you're aware of any organization or facility that might be interested in some 124 00:09:09,460 --> 00:09:14,460 of those, you know, distro bags, please let me know because we can absolutely put some 125 00:09:14,460 --> 00:09:17,660 together and get them distributed. 126 00:09:17,660 --> 00:09:21,980 We've got a lot of things going on with our rail trail, obviously with, you know, the 127 00:09:21,980 --> 00:09:25,180 modification of service and less people riding. 128 00:09:25,180 --> 00:09:30,220 We've gotten more people walking and running and doing things like that, and so we've got 129 00:09:30,220 --> 00:09:35,660 a lot of good things happening on our trail, our usage is up significantly. 130 00:09:35,660 --> 00:09:39,300 In the past, we have done an event called Rails to Trails, but obviously we had put 131 00:09:39,300 --> 00:09:44,460 that on hold due to COVID, and so we ended up canceling that this year, but we are participating 132 00:09:44,460 --> 00:09:50,140 in the Rails to Trails Conservancy's national campaign, which is #ShareYourTrailMoments. 133 00:09:50,140 --> 00:09:54,660 And so along the entire trail, you'll find signs that are asking you to kind of post 134 00:09:54,660 --> 00:09:59,620 pictures of yourself on the trail and hashtag them with #ShareYourTrailMoments. 135 00:09:59,620 --> 00:10:05,300 And so we've, we will be pulling throughout the year that hashtag report and using some 136 00:10:05,300 --> 00:10:08,100 of those photos and things that we're doing. 137 00:10:08,100 --> 00:10:13,780 We've also created a new A-Train Rail Trail Pocket Guide, right, we have not printed it 138 00:10:13,780 --> 00:10:17,540 simply because we wanted to make sure that if there were any service modifications that 139 00:10:17,540 --> 00:10:22,300 we could make those changes to this really cool guide that's huge, but folds down into 140 00:10:22,300 --> 00:10:25,620 like the size of a credit card. 141 00:10:25,620 --> 00:10:31,140 And so that kind of document right now is available for download on our website, but 142 00:10:31,140 --> 00:10:33,060 it is a comprehensive user guide. 143 00:10:33,060 --> 00:10:38,460 So it includes like station access, trail access, parking benches, emergency call stations, 144 00:10:38,460 --> 00:10:43,340 bike racks, safety tips, there's a ton of information on there. 145 00:10:43,340 --> 00:10:47,140 And so it's a really great, a really great resource. 146 00:10:47,140 --> 00:10:51,700 And so we have that available, but as soon as we finalize any type of service modification 147 00:10:51,700 --> 00:10:55,820 based on the transformation initiative, then we'll fully update that document and we'll 148 00:10:55,820 --> 00:10:57,460 actually print them for distribution. 149 00:10:57,460 --> 00:11:02,940 So, but it's a really great piece and I know for those who love the trail, it's very helpful 150 00:11:02,940 --> 00:11:09,480 because it really helps you navigate between the stations or trailheads and the trail itself. 151 00:11:09,480 --> 00:11:14,700 And then exciting news, we just installed four new automatic pedestrian and bicycle counters 152 00:11:14,700 --> 00:11:21,300 on the trail itself, so now DCTA has a total of six counters to track rail trail usage. 153 00:11:21,300 --> 00:11:25,900 And the way that it works is that they count pedestrians and cyclists separately with a 154 00:11:25,900 --> 00:11:31,140 single counter, and it can actually detect direction of travel. 155 00:11:31,140 --> 00:11:37,820 So they are installed on these like discrete metal bollard, they look like a little green 156 00:11:37,820 --> 00:11:43,260 post along the trail and so they're, they look natural to the environment, but they're 157 00:11:43,260 --> 00:11:47,260 all encased there so that, you know, weather is not an issue. 158 00:11:47,260 --> 00:11:51,980 But those counters have really come in handy because if you've seen in the news trail usage 159 00:11:51,980 --> 00:11:56,940 across the county and the country has really surged during coronavirus and so for us to 160 00:11:56,940 --> 00:12:03,660 be able to track actual usage has been very beneficial and so we are analyzing kind of 161 00:12:03,660 --> 00:12:09,240 the number of people that use the trail cyclists versus pedestrians, looking at high traffic 162 00:12:09,240 --> 00:12:12,740 along the rail trail and also where people are accessing the trail. 163 00:12:12,740 --> 00:12:17,820 And so we will use that data in order to kind of provide better reporting of rail trail 164 00:12:17,820 --> 00:12:23,660 utilization, but also for us to look at future rail trail amenities and safety enhancements 165 00:12:23,660 --> 00:12:28,140 like signage, mile markers, lighting, benches, and things like that. 166 00:12:28,140 --> 00:12:32,660 So we partnered with COG on those trail counters and we're really excited to have that technology 167 00:12:32,660 --> 00:12:34,940 available. 168 00:12:34,940 --> 00:12:39,940 With election day coming up, we have been offering, oh, yes. 169 00:12:39,940 --> 00:12:44,340 Oh, no, I just hadn't heard, I'm just joking, I just said, is it? 170 00:12:44,340 --> 00:12:45,340 Okay. 171 00:12:45,340 --> 00:12:46,340 Okay. 172 00:12:46,340 --> 00:12:48,300 It is not, when I said I've got a doozy for y'all today, I really meant it. 173 00:12:48,300 --> 00:12:50,660 We've got a lot of info. 174 00:12:50,660 --> 00:12:56,300 So with election day, we have been offering free rides on select services, so no proof 175 00:12:56,300 --> 00:12:58,380 of voter registration is required. 176 00:12:58,380 --> 00:13:03,660 The last day of that free ride program is on November 3rd, so make sure, you know, you 177 00:13:03,660 --> 00:13:08,100 let folks know that if they need to use transit to get to vote, they absolutely can do so 178 00:13:08,100 --> 00:13:10,140 and they can do so free of charge. 179 00:13:10,140 --> 00:13:14,340 And then we're also doing our Veterans Day free ride campaign as well, and so that's 180 00:13:14,340 --> 00:13:20,220 on November 11th, and that's free rides on select services for veterans and active military. 181 00:13:20,220 --> 00:13:24,300 All they have to do is show their military ID, state ID, or their military designation 182 00:13:24,300 --> 00:13:25,980 or discharge papers. 183 00:13:25,980 --> 00:13:31,340 So lots of free ride campaigns going on right now for really good causes, lots of activity 184 00:13:31,340 --> 00:13:36,940 on the rail trail, some big decisions coming out of our board in the next couple of weeks. 185 00:13:36,940 --> 00:13:43,260 It is an extremely busy time at TCTA, and I am happy to answer any questions as I just 186 00:13:43,260 --> 00:13:47,760 regurgitated all of that information to you, and I know that it was a lot, but I'm also 187 00:13:47,760 --> 00:13:52,580 happy to send Becky links to some of this information that she can send out afterward 188 00:13:52,580 --> 00:13:54,100 if you'd like that for review. 189 00:13:54,100 --> 00:14:00,260 It's an amazing amount of activity, I didn't know that any of that was going on. 190 00:14:00,260 --> 00:14:03,740 Questions, councilmembers? 191 00:14:03,740 --> 00:14:08,180 I have a question. 192 00:14:08,180 --> 00:14:09,860 Actually I have a few. 193 00:14:09,860 --> 00:14:11,460 Some are pretty easy. 194 00:14:11,460 --> 00:14:13,500 I was taking notes the whole time. 195 00:14:13,500 --> 00:14:17,420 So we'll start with the trail because that's kind of where we are actually the free votes. 196 00:14:17,420 --> 00:14:18,420 That's where we left off. 197 00:14:18,420 --> 00:14:20,180 I'll kind of go backwards. 198 00:14:20,180 --> 00:14:23,780 Do we know how many have utilized that service yet? 199 00:14:23,780 --> 00:14:26,260 I mean, are you keeping up with that? 200 00:14:26,260 --> 00:14:30,340 So typically for a normal free ride campaign, we would. 201 00:14:30,340 --> 00:14:33,780 The normal free ride campaign, we would have like a code word. 202 00:14:33,780 --> 00:14:38,360 We would ask our operators on both bus and rail to track that information. 203 00:14:38,360 --> 00:14:40,100 This time around we did not. 204 00:14:40,100 --> 00:14:44,900 So typically what we would do is we would look at year over year ridership, but we also 205 00:14:44,900 --> 00:14:48,980 recognize that that's going to be extremely skewed this year because it's pre COVID versus 206 00:14:48,980 --> 00:14:50,620 post COVID. 207 00:14:50,620 --> 00:14:56,780 So we'll have some idea as to ridership, but we will not have exact for the for the free 208 00:14:56,780 --> 00:14:58,900 ride campaigns this year. 209 00:14:58,900 --> 00:15:04,740 Okay, next question about the trails on the counters. 210 00:15:04,740 --> 00:15:10,640 Is that data that you can share with your member cities, especially where people are 211 00:15:10,640 --> 00:15:16,060 using, you know, to get on the ramp and that would be pretty helpful as we look at all 212 00:15:16,060 --> 00:15:22,940 of our plans, our mobility plan and bike industry and absolutely 100% as soon as we start pulling 213 00:15:22,940 --> 00:15:23,940 those reports. 214 00:15:23,940 --> 00:15:25,860 That's something that I'm happy to forward over. 215 00:15:25,860 --> 00:15:30,420 I am sure that we'll include them in our board packets, but I mean, I can forward them over 216 00:15:30,420 --> 00:15:31,900 to y'all directly as well. 217 00:15:31,900 --> 00:15:34,020 Okay, I think that would be helpful. 218 00:15:34,020 --> 00:15:40,220 The next question on the trail and I ask about this is since there is a lot more usage. 219 00:15:40,220 --> 00:15:46,020 Are we any closer to getting lighting on the trail? 220 00:15:46,020 --> 00:15:50,660 Let me talk to our capital project manager and see where we're at on lighting. 221 00:15:50,660 --> 00:15:53,900 I know we have lighting in specific areas and I know that we've got some safety and 222 00:15:53,900 --> 00:15:59,940 security fundings set aside in FY21 for amenities and improvements and let me see if that's 223 00:15:59,940 --> 00:16:00,940 on the list. 224 00:16:00,940 --> 00:16:03,860 If I could follow up with you on that, that way I can get you exact information. 225 00:16:03,860 --> 00:16:11,340 Okay, and also just the other on the trail, I did see people comment about trash along 226 00:16:11,340 --> 00:16:12,340 the trail. 227 00:16:12,340 --> 00:16:18,660 Is that DCTA or the county or city or is that a contract and who holds that contract? 228 00:16:18,660 --> 00:16:19,660 I just didn't know. 229 00:16:19,660 --> 00:16:20,660 Sure, sure. 230 00:16:20,660 --> 00:16:23,420 So it's actually a little confusing. 231 00:16:23,420 --> 00:16:27,860 It is all dependent upon the portion of the trail. 232 00:16:27,860 --> 00:16:35,380 So in most cases, it's the city who will contract out like for like any mowing or landscape 233 00:16:35,380 --> 00:16:41,100 maintenance and trash but if you let me know specifically where the area is, I can check 234 00:16:41,100 --> 00:16:47,500 with our project manager and she can tell me exactly who's responsible. 235 00:16:47,500 --> 00:16:51,860 It's different from one end of the trail to the other and there's like multiple parties 236 00:16:51,860 --> 00:16:55,620 and so but I can get that information for you. 237 00:16:55,620 --> 00:16:56,620 Great thank you. 238 00:16:56,620 --> 00:17:01,060 A quick question, you mentioned November 5th that there's a meeting. 239 00:17:01,060 --> 00:17:06,060 Is that meeting open for individuals if they want to look at the suggestions? 240 00:17:06,060 --> 00:17:12,100 Absolutely, it is posted as a board meeting and so the posting will go up on Friday of 241 00:17:12,100 --> 00:17:16,740 this week and so it is a virtual meeting but you can join it just like you at any other 242 00:17:16,740 --> 00:17:18,220 DCTA public meeting. 243 00:17:18,220 --> 00:17:20,860 Okay, Chair, I have two more questions. 244 00:17:20,860 --> 00:17:27,580 John, do you want to break in or you're okay with just keep going? 245 00:17:27,580 --> 00:17:28,580 Just keep going. 246 00:17:28,580 --> 00:17:29,580 I'm fine. 247 00:17:29,580 --> 00:17:36,620 Okay, on the on-demand service with the contracts you put out for, were any of those or did 248 00:17:36,620 --> 00:17:40,420 you ask for fuel-efficient cars? 249 00:17:40,420 --> 00:17:44,580 Is it kind of like Uber where each individual has their own car or do the companies have 250 00:17:44,580 --> 00:17:45,580 company cars? 251 00:17:45,580 --> 00:17:47,700 So it's a little bit different. 252 00:17:47,700 --> 00:17:54,540 So Spare is actually a software as a service engine where they would leverage maybe like 253 00:17:54,540 --> 00:18:01,020 Lyft and Irving Holdings and they would kind of be a hub for other on-demand partners to 254 00:18:01,020 --> 00:18:10,100 kind of plug in, whereas VIA actually and I get you the exact model of the vehicle but 255 00:18:10,100 --> 00:18:17,100 it's like a Mercedes van that they use and so I'd have to check and see exactly like 256 00:18:17,100 --> 00:18:21,060 what the fuel efficiency is on those but I could send you information about their specific 257 00:18:21,060 --> 00:18:22,060 vehicles. 258 00:18:22,060 --> 00:18:26,740 Okay, but if someone requested an ADA accessible vehicle that that's right. 259 00:18:26,740 --> 00:18:31,900 So yes, all of VIA's vehicles are ADA accessible. 260 00:18:31,900 --> 00:18:38,260 It is when Spare uses their software platform and they plug in the reason that they're recommending 261 00:18:38,260 --> 00:18:44,580 the use of Lyft and Irving Holdings is that Lyft is not required to be ADA accessible 262 00:18:44,580 --> 00:18:49,180 but Irving Holdings is and so we would have like a dedicated Irving Holdings fleet that 263 00:18:49,180 --> 00:18:51,740 would handle all of our ADA accessibility needs. 264 00:18:51,740 --> 00:18:53,380 Okay, it's good to know. 265 00:18:53,380 --> 00:18:58,740 Last question and it's kind of more of a future question and if you're planning for it. 266 00:18:58,740 --> 00:19:03,460 We did recently hear about the speed train from Dallas to Houston and that's more of 267 00:19:03,460 --> 00:19:07,100 a it seems like a reality. 268 00:19:07,100 --> 00:19:12,860 So I'm curious if we are working on or if we're looking at when those connections come 269 00:19:12,860 --> 00:19:13,860 in. 270 00:19:13,860 --> 00:19:22,700 If DCTA is in, you know, contacts or conversations on that to make sure that we are coordinating 271 00:19:22,700 --> 00:19:27,180 those those routes from Dallas to Denton. 272 00:19:27,180 --> 00:19:29,140 Absolutely, absolutely. 273 00:19:29,140 --> 00:19:31,020 So we are involved. 274 00:19:31,020 --> 00:19:36,060 Typically it's through cog is how we is how we get involved as the MPO and so but we stay 275 00:19:36,060 --> 00:19:41,020 completely engaged in all of those conversations and as it would get to a point where there 276 00:19:41,020 --> 00:19:44,300 would be that type of coordination needed. 277 00:19:44,300 --> 00:19:46,180 We would definitely be having those conversations. 278 00:19:46,180 --> 00:19:47,780 Okay, that's good to know. 279 00:19:47,780 --> 00:19:48,780 I'm done. 280 00:19:48,780 --> 00:19:49,780 Thank you. 281 00:19:49,780 --> 00:19:50,780 Very helpful. 282 00:19:50,780 --> 00:19:51,780 Thank you, John. 283 00:19:51,780 --> 00:19:52,780 Anything else? 284 00:19:52,780 --> 00:19:53,780 All is good. 285 00:19:53,780 --> 00:19:54,780 All right, thank you so much, Nicole. 286 00:19:54,780 --> 00:19:55,780 Thank you for your time. 287 00:19:55,780 --> 00:19:56,780 I appreciate it. 288 00:19:56,780 --> 00:20:12,460 Yeah, yours, right, we're gonna move on to item C receiver report and hold the discussion 289 00:20:12,460 --> 00:20:30,940 regarding City of Denton transportation slash mobility project status report in the area. 290 00:20:30,940 --> 00:20:31,940 Thank you. 291 00:20:31,940 --> 00:20:32,940 on mute. 292 00:20:32,940 --> 00:20:45,420 I mean, whoever's presenting yeah, on mute and invisible. 293 00:20:45,420 --> 00:20:55,680 John Polster with Innovative Transportation Solutions, I'll be going over the report. 294 00:20:55,680 --> 00:21:00,820 Can y'all see the report is that or am I supposed to share it or I think you share your share 295 00:21:00,820 --> 00:21:03,260 screen? 296 00:21:03,260 --> 00:21:09,260 This is all new. 297 00:21:09,260 --> 00:21:15,540 Did he put it on the folder or a mask up brand? 298 00:21:15,540 --> 00:21:16,540 I don't see it. 299 00:21:16,540 --> 00:21:17,620 It's a PDF. 300 00:21:17,620 --> 00:21:20,380 No, I don't see it. 301 00:21:20,380 --> 00:21:25,980 It's all from last night. 302 00:21:25,980 --> 00:21:28,460 So it's on the report here. 303 00:21:28,460 --> 00:21:29,460 Yeah. 304 00:21:29,460 --> 00:21:43,860 It's called exhibit two. 305 00:21:43,860 --> 00:22:04,660 My apologies for the technical difficulty. 306 00:22:04,660 --> 00:22:20,580 It looks promising. 307 00:22:20,580 --> 00:22:26,280 If you can make it a little bit smaller, I think. 308 00:22:26,280 --> 00:22:32,220 So while we're doing that, you're going to note that the report's a little, a little 309 00:22:32,220 --> 00:22:35,700 different by working with Becky and her group. 310 00:22:35,700 --> 00:22:45,220 We are consolidating the report into one report that we work on all on and off system projects. 311 00:22:45,220 --> 00:22:48,060 So it'll cover both the on system and off. 312 00:22:48,060 --> 00:22:53,700 And so we changed the name to reflect that it's more of a transportation mobility report 313 00:22:53,700 --> 00:22:58,620 than it is just on system. 314 00:22:58,620 --> 00:23:10,260 Give John Ryan full credit for advocating for that, the off system part. 315 00:23:10,260 --> 00:23:11,260 All right. 316 00:23:11,260 --> 00:23:23,100 You'll go to the page, I guess, where we start with 2181. 317 00:23:23,100 --> 00:23:30,940 So on 2181 we've been working with tech start, we've got some issues related to coordination 318 00:23:30,940 --> 00:23:36,100 and the contractor on some of their inspection processes. 319 00:23:36,100 --> 00:23:43,660 I know that Becky and her team have been working fairly aggressively to address those issues. 320 00:23:43,660 --> 00:23:50,980 And we had a quarterly meeting with the district yesterday afternoon and in light of some of 321 00:23:50,980 --> 00:23:55,420 the comments and concerns that the city's had with the process, they're going to be 322 00:23:55,420 --> 00:24:03,820 changing project managers to bring in somebody a little bit more skilled at the, this type 323 00:24:03,820 --> 00:24:13,100 of project with a new project manager on the, on the project and then bringing in folks 324 00:24:13,100 --> 00:24:19,780 from the Dallas district who have experience working with utility projects inside tech 325 00:24:19,780 --> 00:24:21,100 start roadway projects. 326 00:24:21,100 --> 00:24:27,400 So we're going to bring in new folks and have a little bit more closer coordination on this 327 00:24:27,400 --> 00:24:34,980 project to make sure that we're not having as many issues as we've had in the past. 328 00:24:34,980 --> 00:24:35,980 So that's 2181. 329 00:24:35,980 --> 00:24:39,900 Unless anybody's got any questions, go to the next one. 330 00:24:39,900 --> 00:24:41,620 I do have a quick question. 331 00:24:41,620 --> 00:24:43,140 Yes, ma'am. 332 00:24:43,140 --> 00:24:50,940 On that is the, the 2181 for the project manager, was that something included in the new contract 333 00:24:50,940 --> 00:24:56,860 for tech start or is that like a city utilities contract? 334 00:24:56,860 --> 00:24:58,780 I'm not sure I understand the question. 335 00:24:58,780 --> 00:24:59,780 Okay. 336 00:24:59,780 --> 00:25:04,340 So is it cause city is city of Denton doing the utilities and that's our, is it a project 337 00:25:04,340 --> 00:25:06,620 manager for us or the project manager? 338 00:25:06,620 --> 00:25:09,860 So text that's actually doing the project construction wise. 339 00:25:09,860 --> 00:25:16,180 And so when they let the project, it included the city of Denton's utilities in that project. 340 00:25:16,180 --> 00:25:21,580 So the city of Denton has an advanced funding agreement with tech start, where the city 341 00:25:21,580 --> 00:25:27,900 will provide inspection of those services, but they make those communications and comments 342 00:25:27,900 --> 00:25:33,460 to the tech start and then tech start addresses the issues with the contractor. 343 00:25:33,460 --> 00:25:40,420 This particular contractor, both the prime and the sub are, are difficult to deal with. 344 00:25:40,420 --> 00:25:46,620 And so the project manager that you see is Stacy clack from text that, and then their 345 00:25:46,620 --> 00:25:53,300 inspector, they, they're, I would say young to the business of project management. 346 00:25:53,300 --> 00:25:55,660 So we're bringing in next month. 347 00:25:55,660 --> 00:25:59,780 You'll see it'll be Mark Ross is the project manager for tech start. 348 00:25:59,780 --> 00:26:05,380 And what I was saying is that text that also does a lot of utility construction in the 349 00:26:05,380 --> 00:26:10,540 Dallas area office for the city of Dallas for their water and wastewater. 350 00:26:10,540 --> 00:26:18,060 So though that area office has more experience dealing with the unique issues that are associated 351 00:26:18,060 --> 00:26:19,700 with utilities. 352 00:26:19,700 --> 00:26:25,020 And so we're bringing in people who have a better understanding of what the city's concerns 353 00:26:25,020 --> 00:26:30,220 are and more experienced project managers from this text outside. 354 00:26:30,220 --> 00:26:31,220 Okay. 355 00:26:31,220 --> 00:26:32,220 Okay. 356 00:26:32,220 --> 00:26:38,820 And that's all covered in the contract costs from text that was a bit out. 357 00:26:38,820 --> 00:26:42,980 So I'm not sure what you're asking on that. 358 00:26:42,980 --> 00:26:47,940 There was a, the city is paying an X amount based on the advanced funding agreement and 359 00:26:47,940 --> 00:26:52,540 the project management is, it's just part of the project management for the state to 360 00:26:52,540 --> 00:26:56,300 build a road, which in this particular case includes the utilities. 361 00:26:56,300 --> 00:26:57,300 Okay. 362 00:26:57,300 --> 00:27:02,020 Well, I guess my question is usually when somebody new comes in, it's a different cost 363 00:27:02,020 --> 00:27:04,660 and there's a different change to that. 364 00:27:04,660 --> 00:27:09,100 So I was just making sure that all that was still covered in the original amount that 365 00:27:09,100 --> 00:27:14,700 was just personnel from the, on the text outside, not the city and not the contractor, which 366 00:27:14,700 --> 00:27:18,220 is bringing in people who know more about what, what they're doing than the ones we 367 00:27:18,220 --> 00:27:19,220 currently have. 368 00:27:19,220 --> 00:27:20,220 Okay. 369 00:27:20,220 --> 00:27:21,220 That's good to know. 370 00:27:21,220 --> 00:27:22,220 Thank you. 371 00:27:22,220 --> 00:27:23,220 Okay. 372 00:27:23,220 --> 00:27:29,340 Next one then, John, just real quickly at council member Briggs, just for clarification, 373 00:27:29,340 --> 00:27:32,460 the city does have a project manager on that project. 374 00:27:32,460 --> 00:27:33,980 You see his name listed there. 375 00:27:33,980 --> 00:27:36,380 His name is Kyle pedigo. 376 00:27:36,380 --> 00:27:42,300 And he is working with the internal coordination with tech start and has currently been coordinating 377 00:27:42,300 --> 00:27:47,600 with Stacy clack, but we'll be coordinating with that new project manager. 378 00:27:47,600 --> 00:27:56,520 So the city is managing internally that utility relocation and also providing construction 379 00:27:56,520 --> 00:27:59,900 inspection from our public works inspection department. 380 00:27:59,900 --> 00:28:04,700 But all of those correspondents go through text to the contractor. 381 00:28:04,700 --> 00:28:07,340 So who, because that's who the contract is through. 382 00:28:07,340 --> 00:28:08,340 Okay. 383 00:28:08,340 --> 00:28:09,340 All right. 384 00:28:09,340 --> 00:28:10,340 Thank you. 385 00:28:10,340 --> 00:28:11,340 Absolutely. 386 00:28:11,340 --> 00:28:12,340 Sorry, John, go ahead. 387 00:28:12,340 --> 00:28:18,540 Thanks so the next one is your Fort Worth drive project, and if you'll go to the construction 388 00:28:18,540 --> 00:28:21,300 section. 389 00:28:21,300 --> 00:28:24,660 So we're on the on track for being done. 390 00:28:24,660 --> 00:28:32,820 First part of February of next year, they continue to work on the payment and they had 391 00:28:32,820 --> 00:28:39,820 a traffic switch around the 19th to the northbound side underneath the railroad track. 392 00:28:39,820 --> 00:28:43,140 But again, this project's on track. 393 00:28:43,140 --> 00:28:50,060 And it's a very swiftly with consular and they've text that has farmed this project 394 00:28:50,060 --> 00:28:54,060 out to console or for project management. 395 00:28:54,060 --> 00:28:59,420 And so they're, they're, they're our contact and this is this project seems to be going 396 00:28:59,420 --> 00:29:00,420 fairly well. 397 00:29:00,420 --> 00:29:07,300 If you recall, right before the whole COVID issue hit the city worked with tech start 398 00:29:07,300 --> 00:29:11,760 on this project to allow them to work for a period of time at night. 399 00:29:11,760 --> 00:29:14,700 And that caught them back up on schedule. 400 00:29:14,700 --> 00:29:22,900 And so we're still on track for being substantially complete before Valentine's Day. 401 00:29:22,900 --> 00:29:27,940 So I think that unless there's questions on Fort Worth drive, we go to the next one. 402 00:29:27,940 --> 00:29:31,660 All right, 35 you may hill. 403 00:29:31,660 --> 00:29:37,060 This is a project that the more we get into it, the more it's turning into a utility project 404 00:29:37,060 --> 00:29:38,900 with a little bit of road. 405 00:29:38,900 --> 00:29:42,900 You see a list of those utilities that are there and then on the next page are like three 406 00:29:42,900 --> 00:29:45,300 or four more that we're having to deal with. 407 00:29:45,300 --> 00:29:49,300 I think you jumped it. 408 00:29:49,300 --> 00:29:54,780 Okay, no worries. 409 00:29:54,780 --> 00:29:59,580 So it's a utility project that we're going to build a little bit of road and interchange 410 00:29:59,580 --> 00:30:01,420 on it as well. 411 00:30:01,420 --> 00:30:10,060 If you'll note the dollar amount as I highlighted, it was at about $46 million originally and 412 00:30:10,060 --> 00:30:16,460 adding the northbound frontage road and those improvements up to 288 increased the cost. 413 00:30:16,460 --> 00:30:25,140 And in August and September's commission action and RTC's action and the 10-year plan they 414 00:30:25,140 --> 00:30:33,500 included an additional almost $20 million to bring this project to be fully funded. 415 00:30:33,500 --> 00:30:38,680 So we added another $15, $18 million to the cost of the project. 416 00:30:38,680 --> 00:30:45,780 We're still looking at being a ready to let date of April of '22. 417 00:30:45,780 --> 00:30:50,820 And we anticipate having all the right of way acquired by the end of the year. 418 00:30:50,820 --> 00:30:58,020 The critical path item on this is that we have some like the Exxon gas station there 419 00:30:58,020 --> 00:31:00,540 at the state school. 420 00:31:00,540 --> 00:31:05,060 It has a hazardous materials that we have to address and typically that's done during 421 00:31:05,060 --> 00:31:06,060 construction. 422 00:31:06,060 --> 00:31:13,500 But in this particular case where the hazardous material tanks are is where the utilities 423 00:31:13,500 --> 00:31:14,500 have to relocate. 424 00:31:14,500 --> 00:31:21,900 So we're reorienting that so the textile come in and remove the hazmat issue prior to construction 425 00:31:21,900 --> 00:31:26,300 so that utilities can relocate where they need to relocate. 426 00:31:26,300 --> 00:31:29,300 So again, it's fully funded. 427 00:31:29,300 --> 00:31:38,860 Project is still tracking for a ready to let of April of '22. 428 00:31:38,860 --> 00:31:46,020 And again, this is 12 lanes of traffic underneath as opposed to the 10 that you saw on Luke 429 00:31:46,020 --> 00:31:47,020 288. 430 00:31:47,020 --> 00:31:52,860 Unless you have any questions, we can go to the next one. 431 00:31:52,860 --> 00:31:54,060 Okay. 432 00:31:54,060 --> 00:32:01,140 So your Dallas Drive project, so as you've probably seen, we've got the restriping done 433 00:32:01,140 --> 00:32:05,500 to have the Dallas Drive exit just be one single lane because there was some safety 434 00:32:05,500 --> 00:32:08,780 issues with having the two lanes come into one. 435 00:32:08,780 --> 00:32:12,820 It is been restriped for the single lane. 436 00:32:12,820 --> 00:32:22,000 We are working with the area office and city staff to try to improve the access in that 437 00:32:22,000 --> 00:32:28,980 area by closing the median so that as you're coming off of 35 going north onto Dallas Drive, 438 00:32:28,980 --> 00:32:36,580 you can't make a left turn onto the frontage road because that's where a lot of the traffic 439 00:32:36,580 --> 00:32:38,200 accidents occur. 440 00:32:38,200 --> 00:32:44,460 So we're working on getting that that median opening closed in the interim. 441 00:32:44,460 --> 00:32:50,980 And then as we move forward, we are working with the district on, as you see in this drawing, 442 00:32:50,980 --> 00:32:58,500 what's happening here in the ultimate is you have direct connects from Dallas Drive to 443 00:32:58,500 --> 00:33:04,340 the right side as opposed to the left side of the main lanes and to the to the managed 444 00:33:04,340 --> 00:33:05,340 lanes. 445 00:33:05,340 --> 00:33:08,180 Well, obviously the managed lanes don't exist there at this point. 446 00:33:08,180 --> 00:33:12,660 So we're going to try to figure out how much of this we can pull out and construct so that 447 00:33:12,660 --> 00:33:18,020 we can make the frontage road, northbound frontage road continuous and the access from 448 00:33:18,020 --> 00:33:21,700 Dallas Drive to 35 safer. 449 00:33:21,700 --> 00:33:27,620 But we're still in the process of trying to figure out how to unravel that sweater. 450 00:33:27,620 --> 00:33:34,460 And I think that's unless you get questions on it, go to the next one. 451 00:33:34,460 --> 00:33:41,740 All right, your 35E merge with W. Obviously, again, the dollar amount went up by another 452 00:33:41,740 --> 00:33:48,020 16 million dollars to 335 million in this 10 year plan update. 453 00:33:48,020 --> 00:33:55,900 So it is fully funded and we're still on track for June 22 ready to let and if we get it 454 00:33:55,900 --> 00:34:01,780 done by then, then they'll be able to move the project up from January 23 to sometime 455 00:34:01,780 --> 00:34:05,300 in 22 because it is fully funded. 456 00:34:05,300 --> 00:34:08,420 Next one. 457 00:34:08,420 --> 00:34:15,380 I have a question on that one because we I believe this is the one where the intersection 458 00:34:15,380 --> 00:34:18,420 at 380 and I 35 is included. 459 00:34:18,420 --> 00:34:19,420 Correct. 460 00:34:19,420 --> 00:34:20,540 And it may be helpful. 461 00:34:20,540 --> 00:34:24,620 I don't know if if we could pull that out as a separate item because I know there was 462 00:34:24,620 --> 00:34:30,860 an a wreck in an article saying that there was some interim work or solutions being worked 463 00:34:30,860 --> 00:34:31,860 out. 464 00:34:31,860 --> 00:34:34,860 I know that we talk about it almost every time here at mobility. 465 00:34:34,860 --> 00:34:35,860 Right. 466 00:34:35,860 --> 00:34:44,980 Could you go over what those are and the timing of those interim fixes to help that area? 467 00:34:44,980 --> 00:34:50,140 So not great news on that front. 468 00:34:50,140 --> 00:34:56,340 You know, the ultimate plans call for braided ramps in this location because both the entrance 469 00:34:56,340 --> 00:35:01,900 and exit needs for this stretch of highway are in the same location. 470 00:35:01,900 --> 00:35:09,780 So we're going to have to be building braided ramps and text that looked at trying to do 471 00:35:09,780 --> 00:35:16,940 that as an interim breakout project, but they felt like it was by the time they got it ready 472 00:35:16,940 --> 00:35:22,900 to go, they would almost be ready for the entire project to go under construction. 473 00:35:22,900 --> 00:35:27,620 So there's no there's no small fixes. 474 00:35:27,620 --> 00:35:29,820 So all the fixes are large. 475 00:35:29,820 --> 00:35:35,300 And by the time you get those in the queue and ready to work this project, it'll be pretty 476 00:35:35,300 --> 00:35:38,620 close to being ready to let. 477 00:35:38,620 --> 00:35:44,860 So in the interim, I don't think there are any that anybody that I've been able to talk 478 00:35:44,860 --> 00:35:48,420 to and I think we've everybody comes up with the same ideas. 479 00:35:48,420 --> 00:35:56,060 But then when you when you start pulling a thread on it, it it doesn't work. 480 00:35:56,060 --> 00:36:01,020 So I would say I don't think there is an interim solution. 481 00:36:01,020 --> 00:36:03,900 And so I don't think there is. 482 00:36:03,900 --> 00:36:10,660 So there's nothing we could do with like lane markings or exiting or, you know, notification. 483 00:36:10,660 --> 00:36:17,620 The problem is that the exit ramp for 380 is just right there at 380. 484 00:36:17,620 --> 00:36:27,220 And the entrance ramp from 35W to come into the freeway is right there just south of that. 485 00:36:27,220 --> 00:36:34,020 And so there is not enough room to put both movements, even to flip the movements doesn't 486 00:36:34,020 --> 00:36:37,060 work. 487 00:36:37,060 --> 00:36:42,420 So and all the markings that what I've been told by the district is they've maximized 488 00:36:42,420 --> 00:36:48,380 the physical markings in the area as much as they can. 489 00:36:48,380 --> 00:36:55,140 And I think, Brian, you've looked at the signal on that and tried to work on the timing as 490 00:36:55,140 --> 00:36:56,140 best we can. 491 00:36:56,140 --> 00:37:05,580 But it's just too many traffic too much traffic is in an area that's not able to handle it. 492 00:37:05,580 --> 00:37:10,940 So yeah, we can keep looking, but right now, nobody's come up with a solution other than 493 00:37:10,940 --> 00:37:12,980 to build the braided ramps. 494 00:37:12,980 --> 00:37:17,300 And by the time we got those ready, the other the whole project would be ready to go to 495 00:37:17,300 --> 00:37:18,300 construction. 496 00:37:18,300 --> 00:37:23,780 Okay, I just see that 2023 date let date and that's kind of disappointing because I know 497 00:37:23,780 --> 00:37:28,620 that this is really a pain and danger for many people. 498 00:37:28,620 --> 00:37:29,620 So thank you. 499 00:37:29,620 --> 00:37:30,620 Yes, ma'am. 500 00:37:30,620 --> 00:37:31,620 Excuse me, John. 501 00:37:31,620 --> 00:37:40,500 What about adding, you know, I'm sure everything is massively expensive, but it seems like part 502 00:37:40,500 --> 00:37:46,020 of the issue is that you got a lane that goes away from the access road and merges right 503 00:37:46,020 --> 00:37:51,780 into the other traffic coming off the highway from, you know, onto the access road. 504 00:37:51,780 --> 00:37:59,220 What about adding a lane for just that little segment of the access road, you know, of the 505 00:37:59,220 --> 00:38:03,260 exit so that they don't have to merge? 506 00:38:03,260 --> 00:38:04,260 Right. 507 00:38:04,260 --> 00:38:09,380 And they have looked at that, but the argument that the district's making from an operational 508 00:38:09,380 --> 00:38:14,300 standpoint is the problem isn't the fact that that auxiliary lane isn't continuous. 509 00:38:14,300 --> 00:38:20,780 The problem is, is that you have all the traffic from 35W that gets necked down to one lane 510 00:38:20,780 --> 00:38:27,620 and is coming on to 35 exactly at the same location, but all the traffic on 35E that 511 00:38:27,620 --> 00:38:30,820 wants to exit 380 is trying to get off. 512 00:38:30,820 --> 00:38:38,900 So you've got both an on and off situation occurring at exactly the same distance. 513 00:38:38,900 --> 00:38:45,700 And the only way to do that is to flip it, but once you flip it, then it opens up significant 514 00:38:45,700 --> 00:38:48,940 other issues with the main lanes. 515 00:38:48,940 --> 00:38:53,780 And then what's happening is if you look out there, the people are just using those Texas 516 00:38:53,780 --> 00:39:00,420 exit ramps and they're just getting off early, so that we can continue to work on it. 517 00:39:00,420 --> 00:39:05,500 We can continue to work with your staff to try to find something. 518 00:39:05,500 --> 00:39:13,100 But to date, everything, once we get into it far enough to start seeing what the consequences 519 00:39:13,100 --> 00:39:17,660 are, we end up getting to a fatal flaw. 520 00:39:17,660 --> 00:39:20,220 What are the prospects for moving it up? 521 00:39:20,220 --> 00:39:28,380 Well, we're shooting for the June 22 let date, and that's based on all those utilities and 522 00:39:28,380 --> 00:39:29,900 the right-of-way needing to be acquired. 523 00:39:29,900 --> 00:39:34,060 So if we hit those dates, we can move it up. 524 00:39:34,060 --> 00:39:38,380 If we beat those dates, we can move it up, because again, as you see, we're fully funded 525 00:39:38,380 --> 00:39:41,780 at the $335 million. 526 00:39:41,780 --> 00:39:47,380 So the date that it's in, the let date, is just where they've got it slotted, but they 527 00:39:47,380 --> 00:39:51,060 can move it up if we get it ready to let sooner. 528 00:39:51,060 --> 00:39:54,060 And we are meeting city meets. 529 00:39:54,060 --> 00:39:59,820 When we meet with TechStat in our every three-week or so meeting, this is one of the meeting 530 00:39:59,820 --> 00:40:05,380 projects that we go over to make sure it stays on track and/or accelerates. 531 00:40:05,380 --> 00:40:13,060 Is all that acquisition work a kind of thing that could get accelerated if more resources 532 00:40:13,060 --> 00:40:16,860 get put on it, or is it like the same two people? 533 00:40:16,860 --> 00:40:21,820 No, they actually have hired out a right-of-way agents on this. 534 00:40:21,820 --> 00:40:25,820 They've got multiple right-of-way agents working on this. 535 00:40:25,820 --> 00:40:29,620 So I think the right-of-way, we're planning on being done by the end of this year. 536 00:40:29,620 --> 00:40:32,500 So I don't think the right-of-way is really the critical path at that point. 537 00:40:32,500 --> 00:40:38,140 The city's got a significant amount of utilities in this corridor that need to be addressed. 538 00:40:38,140 --> 00:40:44,300 Franchise utilities are all throughout this segment, and I think most of the critical 539 00:40:44,300 --> 00:40:51,580 path items going forward from January 21 on is going to be the 18 months it takes to get 540 00:40:51,580 --> 00:40:53,300 those utilities relocated. 541 00:40:53,300 --> 00:41:02,180 I suspect Councilman Ryan would agree, and you can tell me if you don't, John, but I 542 00:41:02,180 --> 00:41:06,340 think that is the intersection I hear about the most frequently. 543 00:41:06,340 --> 00:41:14,340 So if there are clever ways to work that critical path, I'd certainly be supportive. 544 00:41:14,340 --> 00:41:16,340 Yes, sir. 545 00:41:16,340 --> 00:41:18,020 Yeah, I agree. 546 00:41:18,020 --> 00:41:19,020 I agree. 547 00:41:19,020 --> 00:41:23,020 And I think is there another exit like right before the 380, I think? 548 00:41:23,020 --> 00:41:27,220 Is that what you're talking about when you're talking about flipping them, having one of 549 00:41:27,220 --> 00:41:28,740 those, the exits? 550 00:41:28,740 --> 00:41:34,740 I think there's an exit where it's just on and then having one of the exits where it's 551 00:41:34,740 --> 00:41:38,460 just off instead of one doing both. 552 00:41:38,460 --> 00:41:42,140 So you have an exit ramp for 380 just south of 380. 553 00:41:42,140 --> 00:41:44,660 So it's what we call a diamond interchange. 554 00:41:44,660 --> 00:41:53,460 So you exit the freeway very close to 380, and what transpires is that there's so much 555 00:41:53,460 --> 00:42:00,780 traffic wanting to get off at 380 that it rolls up onto the main lanes and it goes past 556 00:42:00,780 --> 00:42:09,180 that auxiliary lane, and then it starts to encroach in the on ramp or where 35W comes 557 00:42:09,180 --> 00:42:14,740 around, which reduces the single lane, and then it has to merge to get onto the main 558 00:42:14,740 --> 00:42:15,740 lanes. 559 00:42:15,740 --> 00:42:23,700 That traffic that's trying to exit, it's backed up all the way to the entrance ramp for 35W. 560 00:42:23,700 --> 00:42:28,900 And so the reason you can't flip it, right, is because the traffic from 35W has to get 561 00:42:28,900 --> 00:42:35,580 on the freeway somewhere around the merge. 562 00:42:35,580 --> 00:42:42,580 You can't carry them up to like an X ramp where you let them get on the freeway right 563 00:42:42,580 --> 00:42:48,300 before they get to 380 and take the traffic off back by the merge because the traffic 564 00:42:48,300 --> 00:42:56,140 for 35W has to go somewhere immediately because the freeway ends. 565 00:42:56,140 --> 00:43:01,620 It is a horrible scenario, and that's why this project got picked up for clear lanes 566 00:43:01,620 --> 00:43:07,320 and was easily able to pick up another 16 million dollars in this last update because 567 00:43:07,320 --> 00:43:13,980 this is for North Texas, this is probably the worst section of 35 left in North Texas 568 00:43:13,980 --> 00:43:14,980 to resolve. 569 00:43:14,980 --> 00:43:20,460 I wonder why it wasn't sort of more obvious in the design phase that this would be a problem. 570 00:43:20,460 --> 00:43:22,180 Anyway, I'm no expert. 571 00:43:22,180 --> 00:43:29,380 The design phase does pick up the issue, and that's when we put in the braided ramps and 572 00:43:29,380 --> 00:43:32,020 we also add additional capacity. 573 00:43:32,020 --> 00:43:33,020 I mean originally. 574 00:43:33,020 --> 00:43:42,540 Yeah, on the interim project that we just did with AECOM, not AECOM, AGL, it went all 575 00:43:42,540 --> 00:43:49,540 the way to 380, but we had to drop the manage lane south of Denton because of right-of-way 576 00:43:49,540 --> 00:43:50,540 issues. 577 00:43:50,540 --> 00:43:57,380 And so we had to build, we added additional capacity to the main lanes, but we didn't 578 00:43:57,380 --> 00:44:02,940 fix any of the access problems because back then they just didn't have enough money to 579 00:44:02,940 --> 00:44:03,940 do it all. 580 00:44:03,940 --> 00:44:04,940 Yeah. 581 00:44:04,940 --> 00:44:05,940 All right. 582 00:44:05,940 --> 00:44:07,940 Council Member Briggs, you wanted to say something? 583 00:44:07,940 --> 00:44:08,940 Yes. 584 00:44:08,940 --> 00:44:09,940 Yeah. 585 00:44:09,940 --> 00:44:10,940 No, that's what I was going to say. 586 00:44:10,940 --> 00:44:14,620 I mean, that's why you hear people saying it was fine, now it's worse before they tried 587 00:44:14,620 --> 00:44:18,180 to fix it, but I don't know that anyone tried to fix anything. 588 00:44:18,180 --> 00:44:21,340 It's just kind of what happened. 589 00:44:21,340 --> 00:44:28,180 So I am in agreement with the Chair here that if there's anything we can do on the city 590 00:44:28,180 --> 00:44:35,660 side or TxDOT to call attention to this before the next few years, I'd like to try to do 591 00:44:35,660 --> 00:44:36,660 that. 592 00:44:36,660 --> 00:44:45,420 I think we'll all keep it on the list to try to find something to do in the interim. 593 00:44:45,420 --> 00:44:50,860 I think one of the things that has made it worse in the last four or five months is with 594 00:44:50,860 --> 00:44:57,260 the construction on Bonnebray, those who used to exit Bonnebray off of 35E are now trying 595 00:44:57,260 --> 00:45:01,860 to continue on and going up to 380 to get off because of our construction there. 596 00:45:01,860 --> 00:45:07,180 So it's just moving around and the quicker we can get Bonnebray completed, I mean, that's 597 00:45:07,180 --> 00:45:13,180 going to be for city, within the city, it's going to be an alternate route when this goes 598 00:45:13,180 --> 00:45:14,180 under construction. 599 00:45:14,180 --> 00:45:16,940 So that needs to be a top priority for us as well. 600 00:45:16,940 --> 00:45:17,940 Yeah. 601 00:45:17,940 --> 00:45:18,940 That's a really good point. 602 00:45:18,940 --> 00:45:23,700 That is the whole point of the Bonnebray project is to serve that purpose. 603 00:45:23,700 --> 00:45:24,700 Okay. 604 00:45:24,700 --> 00:45:26,700 Carry on, John. 605 00:45:26,700 --> 00:45:27,700 All right. 606 00:45:27,700 --> 00:45:28,700 Next project. 607 00:45:28,700 --> 00:45:29,700 All right. 608 00:45:29,700 --> 00:45:32,340 So this is the northern segment. 609 00:45:32,340 --> 00:45:34,980 This is kind of on its own critical path. 610 00:45:34,980 --> 00:45:44,980 Once you get past 77, it becomes less of an issue for the city, but it did have a cost 611 00:45:44,980 --> 00:45:52,140 under run, so we had to add additional funds and now between the two projects, we're clipping 612 00:45:52,140 --> 00:45:54,940 towards a billion dollars worth of improvements. 613 00:45:54,940 --> 00:45:59,020 We're making to 35 from the merge to the county line. 614 00:45:59,020 --> 00:46:06,780 So hopefully in a few years, it'll be much better than it is now. 615 00:46:06,780 --> 00:46:10,420 I think the next project in case there's any questions. 616 00:46:10,420 --> 00:46:12,220 So we've got the main lanes. 617 00:46:12,220 --> 00:46:13,220 We'll skip this. 618 00:46:13,220 --> 00:46:17,900 The only thing we need to know is the text that's got AT&T on contract to do the design, 619 00:46:17,900 --> 00:46:24,780 but if you go to the next project sheet, the interim frontage road projects are things that 620 00:46:24,780 --> 00:46:33,820 we need to focus on, and we've gotten a request from Hillwood to build part of the frontage 621 00:46:33,820 --> 00:46:38,860 road system from 407 North on the southbound side. 622 00:46:38,860 --> 00:46:44,820 And meeting with text that yesterday, they are starting to begin the process of putting 623 00:46:44,820 --> 00:46:50,400 together the protocol for bringing these projects forward and breakouts. 624 00:46:50,400 --> 00:46:57,740 So I would say probably in the next couple of months, we need to work with staff and 625 00:46:57,740 --> 00:47:06,660 policy officials of the city to identify those areas y'all want us to focus on for interim 626 00:47:06,660 --> 00:47:12,460 projects, because we don't have to build the whole frontage road system in this area once 627 00:47:12,460 --> 00:47:14,580 we can build them where it makes sense. 628 00:47:14,580 --> 00:47:17,700 >> I have a question. 629 00:47:17,700 --> 00:47:23,060 When a developer reaches out and asks for something or has a specific thing, I mean, 630 00:47:23,060 --> 00:47:30,980 I'm kind of going back to where the Bucky situation, do they -- I guess, do they -- can 631 00:47:30,980 --> 00:47:37,100 they pay for that or is that just something if it's already in the text.plans that text.plans 632 00:47:37,100 --> 00:47:42,860 pays for, or would that be something that they could pay to get it done sooner? 633 00:47:42,860 --> 00:47:45,020 >> So they can pay to get it done sooner. 634 00:47:45,020 --> 00:47:56,180 I have not actually seen a developer put money into an interstate, like, for example, on 635 00:47:56,180 --> 00:48:03,340 this project that Hillwood wants to expedite, they've already got H&PB under contract to 636 00:48:03,340 --> 00:48:04,340 do the design. 637 00:48:04,340 --> 00:48:10,700 The project's already environmentally cleared, and so the critical path item is utilities 638 00:48:10,700 --> 00:48:11,700 and right-of-way. 639 00:48:11,700 --> 00:48:16,380 Well, Hillwood owns all the right-of-way for the frontage road that they want built, and 640 00:48:16,380 --> 00:48:22,260 so part of the negotiations that is from a county standpoint, we would argue, is that 641 00:48:22,260 --> 00:48:28,660 if they want us to expedite that segment of frontage road, they need to donate the right-of-way, 642 00:48:28,660 --> 00:48:30,180 and that's a cost to them. 643 00:48:30,180 --> 00:48:33,900 I mean, there's value to that frontage. 644 00:48:33,900 --> 00:48:41,420 And then as a -- and then if we get the right-of-way donated, it starts already doing the design, 645 00:48:41,420 --> 00:48:46,120 the funding is not there for this project yet, and Hillwood did ask if there was a way 646 00:48:46,120 --> 00:48:52,540 to front the money, if they could get paid back, and the answer is no, the state doesn't 647 00:48:52,540 --> 00:48:54,760 have that mechanism. 648 00:48:54,760 --> 00:49:00,460 And so it's just a matter of identifying where we want to move forward on these projects, 649 00:49:00,460 --> 00:49:06,020 and then once I'm told this is where the city wants to start, the right-of-way can be taken 650 00:49:06,020 --> 00:49:10,620 care of if the developer is on board, the utilities will be its own issue, and so it's 651 00:49:10,620 --> 00:49:14,060 just a matter of us going and finding the construction dollars. 652 00:49:14,060 --> 00:49:19,400 Okay, thank you. 653 00:49:19,400 --> 00:49:22,460 So next project, if we don't have any questions. 654 00:49:22,460 --> 00:49:26,740 So this is your 380 project out to 377. 655 00:49:26,740 --> 00:49:29,420 The city has turned in their funding. 656 00:49:29,420 --> 00:49:38,900 We should have a scheduled kickoff meeting probably sometime in November for this project, 657 00:49:38,900 --> 00:49:46,580 and so the next thing you should start seeing is the contractor will provide us with a phase 658 00:49:46,580 --> 00:49:52,140 schedule and we'll be able to start reporting to you the status of the construction of the 659 00:49:52,140 --> 00:49:54,500 project. 660 00:49:54,500 --> 00:50:03,020 So this has gone from project delivery to construction probably in our next meeting. 661 00:50:03,020 --> 00:50:04,700 Next project. 662 00:50:04,700 --> 00:50:18,780 380 East, this is a segment east of 377, and again, the right-of-way has been completed. 663 00:50:18,780 --> 00:50:23,140 Utilities, I think this is the one that's on more than one page. 664 00:50:23,140 --> 00:50:32,860 Utilities are tragic in this area and includes the Denton ISD School District with Braswell, 665 00:50:32,860 --> 00:50:40,720 and so if we go back to the previous page, we've got a ready-to-let date of May at 21, 666 00:50:40,720 --> 00:50:44,820 and that's when it's scheduled, and I'll be honest with you, we're going to be hard-pressed 667 00:50:44,820 --> 00:50:50,020 to make that date just because of the impacts we're having with utilities. 668 00:50:50,020 --> 00:50:55,680 So I look to have this project probably move a little bit. 669 00:50:55,680 --> 00:51:00,380 We had to increase the funding of this project to 140. 670 00:51:00,380 --> 00:51:08,860 It was around 130 last time we met, and yeah, so the utilities are killing us on this project. 671 00:51:08,860 --> 00:51:16,220 Unless you have any questions, we'll go to the next project. 672 00:51:16,220 --> 00:51:23,100 Luke 288 West, okay, so we bought the project environmentally cleared last month, so we're 673 00:51:23,100 --> 00:51:25,100 ready to go into design. 674 00:51:25,100 --> 00:51:32,420 First that's asked the county to pick up the design cost on this project, so depending 675 00:51:32,420 --> 00:51:39,620 upon what we're going to do, we've already started the right-of-way mapping on this project, 676 00:51:39,620 --> 00:51:45,540 so we're going to be acquiring all the right-of-way that's needed for Luke 288 for a controlled 677 00:51:45,540 --> 00:51:51,380 access freeway, but we'll be designing and building just the northbound frontage road 678 00:51:51,380 --> 00:52:01,580 first, but in order to do that, Chang Patel will have to design pretty far along the entire 679 00:52:01,580 --> 00:52:08,820 project so that they know where the northbound frontage road lies in relationship to the 680 00:52:08,820 --> 00:52:14,540 road, and it'll also include, this initial phase will also include grade separations 681 00:52:14,540 --> 00:52:23,300 at 380 and the railroad track so that we'll address those major crossings in its first 682 00:52:23,300 --> 00:52:32,500 phase, so I look to have Chang Patel on contract for the design work probably first quarter 683 00:52:32,500 --> 00:52:41,080 of next year, and that's when we'll start more intense coordination with the city related 684 00:52:41,080 --> 00:52:47,220 to the specific needs they have for that project. 685 00:52:47,220 --> 00:52:50,740 - I have a question. 686 00:52:50,740 --> 00:52:56,500 On this one, because it says environmental clearance was received September 2020, and 687 00:52:56,500 --> 00:53:01,420 I know that we have the first part of this project with the frontage roads, it'll be 688 00:53:01,420 --> 00:53:11,020 a lot sooner, hopefully, than that date, 2026, so does the environmental clearance last 689 00:53:11,020 --> 00:53:19,160 six years or would just starting the project with the frontage roads, how does that work? 690 00:53:19,160 --> 00:53:20,940 - That's a good question. 691 00:53:20,940 --> 00:53:26,260 So back in the day, they used to have shelf life of about three years for these environmental 692 00:53:26,260 --> 00:53:31,840 documents, and then what happened is they would have to go through a process when they 693 00:53:31,840 --> 00:53:39,820 go to construction is identify continuous activity on the project, well, the continuous 694 00:53:39,820 --> 00:53:47,180 activity can include the utility relocations, et cetera, and the right-of-way acquisition, 695 00:53:47,180 --> 00:53:55,540 and so the feds over time relaxed that shelf life issue, and now there's no expiration 696 00:53:55,540 --> 00:54:06,460 on the environmental document, but between September of 2020 and April of 2026, when 697 00:54:06,460 --> 00:54:12,700 we go to go to construction on this project, there will probably be what's called a reevaluation 698 00:54:12,700 --> 00:54:23,260 right before the project is awarded to pick up all the things that they didn't find during 699 00:54:23,260 --> 00:54:28,300 the schematic phase that we find during design, so there'll be areas where we need additional 700 00:54:28,300 --> 00:54:32,860 right-of-way for drainage, there'll be areas where we had to tweak the alignment, and all 701 00:54:32,860 --> 00:54:43,620 of those will be picked up right before the project is awarded through a reevaluation. 702 00:54:43,620 --> 00:54:46,180 - Okay. 703 00:54:46,180 --> 00:54:53,700 - Next project, 1515, this is another project, TxDOT's asked Denton County to do the PS&A 704 00:54:53,700 --> 00:55:01,100 on, so again, first part of next year, we should have LTRA on contract. 705 00:55:01,100 --> 00:55:08,580 We selected them for everything, both Chank Patel and LTRA were selected to do everything, 706 00:55:08,580 --> 00:55:15,620 and so we're just getting a scope from them and a fee to do the PS&A phase, and so we 707 00:55:15,620 --> 00:55:22,620 should have them on contract first part of next year, first quarter. 708 00:55:22,620 --> 00:55:27,340 - On this project, is this the one with the traffic circle? 709 00:55:27,340 --> 00:55:29,820 - Yes, ma'am, at Western. 710 00:55:29,820 --> 00:55:39,100 - Okay, and when you do a project like this, does it include the side paths or sidewalks? 711 00:55:39,100 --> 00:55:40,820 - Yes, ma'am. 712 00:55:40,820 --> 00:55:47,260 In all TxDOT projects now, they do sidewalks, minimum of sidewalks, five-foot sidewalks 713 00:55:47,260 --> 00:55:57,860 on both sides, and I got to go back and check, because we cleared this in August, whether 714 00:55:57,860 --> 00:56:01,780 or not we have a 14-foot outside lane, because that used to be also a requirement to have 715 00:56:01,780 --> 00:56:08,220 a 14-foot outside lane, but I think they've gotten rid of that requirement recently, and 716 00:56:08,220 --> 00:56:10,340 they just go to a 12-foot outside lane. 717 00:56:10,340 --> 00:56:12,940 - Okay, thank you. 718 00:56:12,940 --> 00:56:21,660 - Next, 1173, this is a project into CRUM, we'll continue to work on it, Garver is doing 719 00:56:21,660 --> 00:56:27,740 the environmental clearance, we expect to be cleared March next year, and then we'll 720 00:56:27,740 --> 00:56:33,980 roll into right-of-acquisition and utility relocation, it's a little over $50 million, 721 00:56:33,980 --> 00:56:39,500 we don't have the funding for it, but I'm fairly confident by the time we need it, we'll 722 00:56:39,500 --> 00:56:47,220 have it funded, and it's consistent, the Bartow Road alignment is consistent with what we're 723 00:56:47,220 --> 00:56:54,660 putting in the 35 project that was funded, that we went over earlier for the merge project. 724 00:56:54,660 --> 00:57:02,260 - Next, integrated corridor, I'm going to get you a better map, because I think Becky 725 00:57:02,260 --> 00:57:09,900 received a better update from folks last week, earlier this week, but essentially we'll focus 726 00:57:09,900 --> 00:57:18,900 in on the Denton County portion in general and in the city portion in particular, but 727 00:57:18,900 --> 00:57:27,580 this encompasses loop 288, 428, and the integrated east-west corridor, north and south of 380, 728 00:57:27,580 --> 00:57:33,020 and the outer loop, so it picks up everything, and I think we've got, we had a conversation, 729 00:57:33,020 --> 00:57:35,780 was that yesterday, Becky? 730 00:57:35,780 --> 00:57:47,180 It seems like a long time ago, getting old, and so we'll refine what we present, and the 731 00:57:47,180 --> 00:57:55,020 bottom line is I think that right now the integrated corridor is premature for significant 732 00:57:55,020 --> 00:58:01,780 public involvement, because COG hasn't even run modeling numbers on these alignments, 733 00:58:01,780 --> 00:58:06,100 so they're not even sure if they warrant at this point, so I think we're going to back 734 00:58:06,100 --> 00:58:12,820 up a little bit on the communication side of it, but we're going to be continuing to 735 00:58:12,820 --> 00:58:18,860 pursue it at the staff level with both Tex.com and COG. 736 00:58:18,860 --> 00:58:24,740 Mr. Polster, on this project, is this the one that a lot of it significantly goes through 737 00:58:24,740 --> 00:58:27,900 our greenbelt and ESAs? 738 00:58:27,900 --> 00:58:31,100 Yes, ma'am. 739 00:58:31,100 --> 00:58:38,380 Okay, and we're not, you said we're pulling back on this a little bit, not quite ready, 740 00:58:38,380 --> 00:58:41,740 because I mean, I know that I'm concerned about some of it. 741 00:58:41,740 --> 00:58:47,340 Correct, and I think that at the staff level, policy level, city level, you know, between 742 00:58:47,340 --> 00:58:55,800 the Tex.com and MPO and the city and the county, we all need to have a conversation internally, 743 00:58:55,800 --> 00:59:00,900 but I don't think it's ready for public involvement, because we don't really even know if any of 744 00:59:00,900 --> 00:59:09,980 these warrant, and so we do know that the city and core and the county all have concerns 745 00:59:09,980 --> 00:59:13,340 about the impacts to the greenbelt. 746 00:59:13,340 --> 00:59:17,940 There's a reason why it's there, and so we just think that it's premature, because we 747 00:59:17,940 --> 00:59:23,740 really don't have anything we can tell anybody, the public on this, and people are already 748 00:59:23,740 --> 00:59:27,300 deciding they're not going to plant their spring garden, because they think we're going 749 00:59:27,300 --> 00:59:31,700 to take it for this road, and we're not even anywhere near even knowing what the alignment 750 00:59:31,700 --> 00:59:32,700 is. 751 00:59:32,700 --> 00:59:36,220 So I think when I say pull back, it's the public side of it. 752 00:59:36,220 --> 00:59:42,980 Internally, staffs from all these organizations need to work to vet what we all think about 753 00:59:42,980 --> 00:59:45,460 this integrated corridor concept. 754 00:59:45,460 --> 00:59:47,740 Well, thank you for the clarification. 755 00:59:47,740 --> 00:59:51,980 I know I've heard a lot of people concerned, so I appreciate you speaking to it. 756 00:59:51,980 --> 00:59:52,980 Yes, ma'am. 757 00:59:52,980 --> 00:59:59,300 It really does make you wonder what exactly is the huge pressing demand that this will 758 00:59:59,300 --> 01:00:04,580 meet that will make our lives better, that's better than what we will lose. 759 01:00:04,580 --> 01:00:09,340 Okay, so excellent question, and that's why we're going to get you some more detailed 760 01:00:09,340 --> 01:00:16,780 information on your report, but the 2045 projections for 380, which is that D alignment, the purple 761 01:00:16,780 --> 01:00:23,940 one where the 380 currently exists, where we're coming in and doing a $140 million super 762 01:00:23,940 --> 01:00:29,420 street where we're adding a sixth, fifth and sixth lane and grade separations at five locations, 763 01:00:29,420 --> 01:00:33,820 that doesn't, that won't carry the traffic that's needed, because the traffic projections 764 01:00:33,820 --> 01:00:40,020 are in the 80,000 vehicles per day, which is freeway volumes. 765 01:00:40,020 --> 01:00:46,820 And so technically speaking, 380 shouldn't be an arterial or a super street, it should 766 01:00:46,820 --> 01:00:52,180 be a freeway with frontage roads and main lanes. 767 01:00:52,180 --> 01:01:00,660 But that would decimate all of the development east of 377 as it goes north and all of 380, 768 01:01:00,660 --> 01:01:04,540 that whole corridor would just have to be torn down and started over. 769 01:01:04,540 --> 01:01:06,340 And nobody's got the stomach for that. 770 01:01:06,340 --> 01:01:11,940 So we got to find some thing that carries the traffic east-west in this area that's 771 01:01:11,940 --> 01:01:19,020 not 380 and that's not as far north as that blue line, which is the outer loop. 772 01:01:19,020 --> 01:01:25,420 Or we just ignore it and don't do anything, which, you know, who knows what's going to 773 01:01:25,420 --> 01:01:26,420 happen. 774 01:01:26,420 --> 01:01:31,820 But there's a driving, there's a drive, there's a need for some additional infrastructure 775 01:01:31,820 --> 01:01:38,340 in this area and what County's thoroughfare plan demonstrated is that you need all three 776 01:01:38,340 --> 01:01:39,340 of these corridors. 777 01:01:39,340 --> 01:01:42,840 You need to make the improvements to 380 that are proposed. 778 01:01:42,840 --> 01:01:48,420 You need the outer loop, but you also need a mid-range project somewhere between the 779 01:01:48,420 --> 01:01:49,420 two. 780 01:01:49,420 --> 01:01:53,300 That's another one where you wonder, I mean, I don't know if I would have been smart enough 781 01:01:53,300 --> 01:01:59,260 to see it, but, you know, if we could have all seen that eventually this is going to 782 01:01:59,260 --> 01:02:02,980 be needed, then maybe we wouldn't have built the strip malls right up close to the narrow 783 01:02:02,980 --> 01:02:03,980 road. 784 01:02:03,980 --> 01:02:06,020 So Denton County saw the issue back. 785 01:02:06,020 --> 01:02:12,860 This was back when Cynthia Watt was the County Commissioner and we put in a policy and we 786 01:02:12,860 --> 01:02:18,900 tried to protect it, that corridor, not tell how that corridor developed the way it did, 787 01:02:18,900 --> 01:02:28,660 but developers went around the County, those communities out there, they had those districts 788 01:02:28,660 --> 01:02:36,580 that were created without our consent and yeah, we tried to stop them, but we were, 789 01:02:36,580 --> 01:02:44,220 we had, we don't, the County level at the point didn't have the power to stop it and 790 01:02:44,220 --> 01:02:52,860 text that doesn't stop those things. 791 01:02:52,860 --> 01:02:59,700 Next, here we get into the more city type projects. 792 01:02:59,700 --> 01:03:09,100 So Bonnie Bray phase six is the section that we're working with the MPO on for funding 793 01:03:09,100 --> 01:03:17,660 and timing on it and so we continue to move forward with this project as a total package 794 01:03:17,660 --> 01:03:23,860 for all of Bonnie Bray and this is the one that we're focused on right now. 795 01:03:23,860 --> 01:03:32,860 Now what the city is focusing on, just generally speaking, as we go forward in these projects 796 01:03:32,860 --> 01:03:42,300 is getting funding for Bonnie Bray, Hickory, Crete, and the backfill on May Hill and so 797 01:03:42,300 --> 01:03:46,980 Bonnie Bray is the one that we got to work on the most, I guess, because we've gotten 798 01:03:46,980 --> 01:03:48,740 some successes on the other two. 799 01:03:48,740 --> 01:03:56,260 So I think first quarter next year, we should be able to give you a better idea on the successes 800 01:03:56,260 --> 01:04:00,660 we've had with the funding on these Bonnie Bray phases. 801 01:04:00,660 --> 01:04:02,820 We want to go to the next one. 802 01:04:02,820 --> 01:04:11,920 This is phase seven and this is a segment north of 77 and COG has committed again in 803 01:04:11,920 --> 01:04:17,560 our last meeting with them that they are aware that this is theirs to fund. 804 01:04:17,560 --> 01:04:24,420 So that $10 million that it'll take to do those improvements, COG has said that this 805 01:04:24,420 --> 01:04:34,500 is on their column to do, there won't be any city funding requests for this. 806 01:04:34,500 --> 01:04:43,700 So if you go to the next one, okay, so May Hill, last Friday, the 23rd, the city submitted 807 01:04:43,700 --> 01:04:48,500 a tip modification to COG. 808 01:04:48,500 --> 01:04:58,460 We've already been prior approved for an additional $4 million in construction on that the green 809 01:04:58,460 --> 01:05:02,540 segment, I believe, it doesn't matter. 810 01:05:02,540 --> 01:05:09,660 We needed another $4 million and we submitted that tip mod last Friday and once it goes 811 01:05:09,660 --> 01:05:13,340 through the process, those funds will be made available to the city, they'll be wired to 812 01:05:13,340 --> 01:05:15,380 you and we'll be able to finish this project. 813 01:05:15,380 --> 01:05:19,380 So we were told to submit it the way we submitted it. 814 01:05:19,380 --> 01:05:25,060 So I'm fairly confident the COG staff will get it approved at the RTC level. 815 01:05:25,060 --> 01:05:31,020 And once it's approved at the RTC level, that means we have the money and it's just a matter 816 01:05:31,020 --> 01:05:35,420 of getting the state and the feds put it in their system. 817 01:05:35,420 --> 01:05:39,940 So good news on the three projects that we're trying to get funded, May Hill, Hicker Creek 818 01:05:39,940 --> 01:05:45,860 and Bonnebrae, today we can tell you that that tip mod that we submitted basically closes 819 01:05:45,860 --> 01:05:52,740 out the financial books for May Hill so we don't have to worry about the additional funding 820 01:05:52,740 --> 01:05:53,740 from the city. 821 01:05:53,740 --> 01:05:54,740 - Mr. Polster? 822 01:05:54,740 --> 01:05:55,740 - Yes, ma'am. 823 01:05:55,740 --> 01:06:01,260 - On this one, on the green, is this the section where you had to work with Medical City? 824 01:06:01,260 --> 01:06:07,420 I know that they had a lot of questions about right away and stuff. 825 01:06:07,420 --> 01:06:15,000 Is that this area and has that been communicated and taken care of or is this a different project? 826 01:06:15,000 --> 01:06:20,580 - So the stuff that we're working with Medical City on was for the May Hill interchange in 827 01:06:20,580 --> 01:06:24,580 the frontage road that goes along the front of their building where we had to have them 828 01:06:24,580 --> 01:06:25,740 move their sign. 829 01:06:25,740 --> 01:06:32,980 So there is some impacts to the hospital on the May Hill portion, but it only goes back 830 01:06:32,980 --> 01:06:34,620 so far. 831 01:06:34,620 --> 01:06:40,100 So in this particular segment, the impacts that we had with the hospital were due to 832 01:06:40,100 --> 01:06:46,260 the interchange project that we were doing with TechStop that's a breakout project. 833 01:06:46,260 --> 01:06:48,260 - Okay. 834 01:06:48,260 --> 01:06:50,620 - So we'll move to the next one. 835 01:06:50,620 --> 01:06:55,620 So McKinney, we continue to develop this project. 836 01:06:55,620 --> 01:06:56,860 We're just putting in the report. 837 01:06:56,860 --> 01:07:04,900 I think if you got questions, the staff will have to give you an update on it. 838 01:07:04,900 --> 01:07:07,500 If not, that's where we're at. 839 01:07:07,500 --> 01:07:08,660 - I have a question. 840 01:07:08,660 --> 01:07:12,140 I didn't get to ask it yesterday. 841 01:07:12,140 --> 01:07:21,260 I did see kids trying to cross McKinney there at the Ryan entrance because the construction 842 01:07:21,260 --> 01:07:25,540 has taken away the sidewalk there on the Ryan side. 843 01:07:25,540 --> 01:07:31,780 So kids are actually trying to, they're moving over to the other side and trying to cross 844 01:07:31,780 --> 01:07:32,780 the street. 845 01:07:32,780 --> 01:07:39,380 But I don't think that there is a crosswalk button or anything there for their safety 846 01:07:39,380 --> 01:07:42,740 except for the red light to change. 847 01:07:42,740 --> 01:07:49,420 In the future, is that planned for a better intersection there for pedestrians to cross? 848 01:07:49,420 --> 01:07:55,820 Because I think that bus stop is on that side of the road too. 849 01:07:55,820 --> 01:08:01,500 - Council Member Briggs, we will have to look into that and look at that actual intersection 850 01:08:01,500 --> 01:08:07,780 and make sure that we have evaluated what's gonna happen as far as the crosswalk at Ryan 851 01:08:07,780 --> 01:08:10,980 High School and we can report back to you on that. 852 01:08:10,980 --> 01:08:11,980 - Okay. 853 01:08:11,980 --> 01:08:12,980 Thank you. 854 01:08:12,980 --> 01:08:15,980 - Yes, ma'am. 855 01:08:15,980 --> 01:08:26,380 - Okay, so Hickory Creek, good news at the ESTAC meeting on Friday, one of the requests 856 01:08:26,380 --> 01:08:31,900 the city made in the interim, 'cause we're doing this in multiple phases was an additional 857 01:08:31,900 --> 01:08:37,900 $10 million on the blue section. 858 01:08:37,900 --> 01:08:41,220 And so we're eating this a little bit at a time. 859 01:08:41,220 --> 01:08:47,420 And so the most recent request from the city to cog was for additional $10 million in that 860 01:08:47,420 --> 01:08:48,420 blue segment. 861 01:08:48,420 --> 01:08:56,660 And at ESTAC, the technical committee approved the additional $10 million for this project 862 01:08:56,660 --> 01:09:01,780 and we'll go to RTC in two weeks once it's approved. 863 01:09:01,780 --> 01:09:06,140 Then it's just a matter of getting it in the state plan and the fed plan. 864 01:09:06,140 --> 01:09:12,540 But what we'll be able to tell you next month once RTC approves it, that we've got the additional 865 01:09:12,540 --> 01:09:20,700 10 million for this project that we were asking cog for. 866 01:09:20,700 --> 01:09:26,860 So we'll be fleshing this out as we get the information. 867 01:09:26,860 --> 01:09:28,380 This is a working document. 868 01:09:28,380 --> 01:09:33,840 We just put all the off-system projects in this report, so we'll be filling this stuff 869 01:09:33,840 --> 01:09:37,180 out with more detail as we develop the report. 870 01:09:37,180 --> 01:09:43,940 So, and then that's it for my report. 871 01:09:43,940 --> 01:09:48,680 I don't have any questions. 872 01:09:48,680 --> 01:09:53,340 - Anyone, or should we, ready to move on? 873 01:09:53,340 --> 01:09:57,580 I think you got your questions along the way. 874 01:09:57,580 --> 01:09:58,580 So thank you very much. 875 01:09:58,580 --> 01:10:07,460 - Now what happens, do we keep, is there more, you know, on the off-system? 876 01:10:07,460 --> 01:10:11,460 - No, sir. 877 01:10:11,460 --> 01:10:14,860 He's completed with his report and we can move on to the next agenda item. 878 01:10:14,860 --> 01:10:15,860 - Okay. 879 01:10:15,860 --> 01:10:16,860 Very good. 880 01:10:16,860 --> 01:10:18,900 Thanks for clarifying that. 881 01:10:18,900 --> 01:10:25,420 So that concludes item C. We'll now move to item D, staff update regarding bollards for 882 01:10:25,420 --> 01:10:30,100 closing downtown streets, Alice University pedestrian access, election day polling location 883 01:10:30,100 --> 01:10:35,100 accessibility slash detour plans, and senior transportation planner slash ADA coordinator 884 01:10:35,100 --> 01:10:36,980 position status. 885 01:10:36,980 --> 01:10:43,100 - Good morning everyone, Brian Jahn, city traffic engineer. 886 01:10:43,100 --> 01:10:58,900 Let me find, okay, I'm not gonna be able to make this full screen, Billy, so I'm just 887 01:10:58,900 --> 01:11:00,620 gonna go through it. 888 01:11:00,620 --> 01:11:02,580 So we have four topics today. 889 01:11:02,580 --> 01:11:06,660 The first one is the bollards for closing downtown. 890 01:11:06,660 --> 01:11:11,740 This has been on our list for quite some time and basically what I put together is a kind 891 01:11:11,740 --> 01:11:12,740 of a summary. 892 01:11:12,740 --> 01:11:21,820 We don't, we don't have a plan, but this will allow us to develop a plan to move forward. 893 01:11:21,820 --> 01:11:27,820 So four types of bollards, four purposes, embedded bollards, surface mounted bollards, 894 01:11:27,820 --> 01:11:30,860 rebounding bollards, and then the retractable and removable. 895 01:11:30,860 --> 01:11:36,180 So for our discussion purposes, we're talking about the operations around the downtown square. 896 01:11:36,180 --> 01:11:41,840 Currently, we use either vehicles or barricades to block those roadways when we have a function 897 01:11:41,840 --> 01:11:42,840 around the square. 898 01:11:42,840 --> 01:11:51,740 And we're, the purpose of this item was to identify a safer and a little bit more appropriate 899 01:11:51,740 --> 01:11:55,080 way to block those streets on a regular basis. 900 01:11:55,080 --> 01:12:01,220 So based on that, any kind of a permanent bollard really doesn't apply. 901 01:12:01,220 --> 01:12:06,140 And certainly the rebounding bollards, which is something that we use along our bike lanes 902 01:12:06,140 --> 01:12:07,780 now, doesn't apply. 903 01:12:07,780 --> 01:12:11,700 So we're really only looking at that last section of retractable removal. 904 01:12:11,700 --> 01:12:16,380 So it's kind of a decision, do we want to have a permanent bollard that either retracts 905 01:12:16,380 --> 01:12:21,220 into the roadway, or do we want to have a base that stays in the roadway and we simply 906 01:12:21,220 --> 01:12:23,100 attach a bollard to it? 907 01:12:23,100 --> 01:12:26,180 So I'll move through this really quickly. 908 01:12:26,180 --> 01:12:37,140 Okay, so the, they're really, the design is to allow the city to designate whether or 909 01:12:37,140 --> 01:12:40,420 not a vehicle can traverse this piece of roadway. 910 01:12:40,420 --> 01:12:48,140 Again, the two kinds are a retractable, which is typically a hydraulic system, fairly expensive, 911 01:12:48,140 --> 01:12:53,340 difficult to, not difficult, but expensive to install and expensive to maintain. 912 01:12:53,340 --> 01:13:01,420 If we are operating something like the feds where you've got an emergency type of bollard, 913 01:13:01,420 --> 01:13:05,620 or you want to keep traffic out of an area at all times, except when somebody's doing 914 01:13:05,620 --> 01:13:10,620 a garage or you need a delivery, then those retractables are the appropriate type of bollard. 915 01:13:10,620 --> 01:13:13,980 However, our events are fairly spread out. 916 01:13:13,980 --> 01:13:17,020 We don't, they're not on a weekly or a daily basis. 917 01:13:17,020 --> 01:13:21,780 So our recommendation is to really go with something more along the lines of the retractable 918 01:13:21,780 --> 01:13:22,780 bollard. 919 01:13:22,780 --> 01:13:25,300 And I've got some exhibits here that show you the difference. 920 01:13:25,300 --> 01:13:32,260 Here's a, here's a retractable bollard, you've got a base that is permanent and you simply 921 01:13:32,260 --> 01:13:36,980 have a truck or a trailer with a bunch of bollards and these are installed manually. 922 01:13:36,980 --> 01:13:39,500 You lock them down. 923 01:13:39,500 --> 01:13:45,700 I've seen this number of places, the city of Fort Worth uses this at Royal Rogers Coliseum 924 01:13:45,700 --> 01:13:49,900 during the stock show rodeo where they want to change the traffic pattern. 925 01:13:49,900 --> 01:13:56,140 They can just simply install these bollards fairly quickly and, but you do have to have 926 01:13:56,140 --> 01:14:00,220 a place to store them and you do have to have a crew to install them and then remove them. 927 01:14:00,220 --> 01:14:02,620 And that's the downside of the retractable. 928 01:14:02,620 --> 01:14:06,980 So on the right hand side, you see these, the removal bread on the right hand side of 929 01:14:06,980 --> 01:14:07,980 the screen. 930 01:14:07,980 --> 01:14:13,660 You see the retractables, very extensive construction, again, typically hydraulic. 931 01:14:13,660 --> 01:14:18,540 And so they come with a maintenance component that the removals don't have. 932 01:14:18,540 --> 01:14:24,020 Our recommendation, if we want to move forward with bollards are permanent is to go with 933 01:14:24,020 --> 01:14:30,020 the removable, we still have to have some construction effort. 934 01:14:30,020 --> 01:14:38,380 But for 90% of the time, it's simply a smooth roadway surface and when we want to close 935 01:14:38,380 --> 01:14:44,000 those roadways, we send a crew out with a trailer full of bollards and we close whatever. 936 01:14:44,000 --> 01:14:50,300 So moving forward, what we would need is, this begs another discussion of where do we 937 01:14:50,300 --> 01:14:58,940 want to be able to close the roadways because once we make the decision to move to a bollard, 938 01:14:58,940 --> 01:15:03,000 we don't have the flexibility that we have with barricades or vehicles. 939 01:15:03,000 --> 01:15:04,580 They're in the same place every time. 940 01:15:04,580 --> 01:15:09,700 So we really need to spend some time and discuss where we want to put these bollards, how far 941 01:15:09,700 --> 01:15:10,700 away from the square? 942 01:15:10,700 --> 01:15:14,020 Is it just the first roadways around the square? 943 01:15:14,020 --> 01:15:17,860 Do we want to go back one or do we want to have a system of bollards? 944 01:15:17,860 --> 01:15:23,300 But those are some questions that we would have and we need some further discussion if 945 01:15:23,300 --> 01:15:25,060 that would please the committee. 946 01:15:25,060 --> 01:15:30,420 >> If I could ask -- >> So the second item is, we've talked about 947 01:15:30,420 --> 01:15:31,420 this for a while. 948 01:15:31,420 --> 01:15:32,420 >> I have a question. 949 01:15:32,420 --> 01:15:37,020 >> Especially with this committee and especially with traffic safety, is the pedestrian access 950 01:15:37,020 --> 01:15:39,360 at Allison University. 951 01:15:39,360 --> 01:15:40,360 >> Can you pause for questions? 952 01:15:40,360 --> 01:15:46,620 >> If anyone is familiar with -- oh, okay. 953 01:15:46,620 --> 01:15:48,500 >> Yeah, Councilmember Briggs. 954 01:15:48,500 --> 01:15:49,500 >> Okay. 955 01:15:49,500 --> 01:15:50,500 Questions? 956 01:15:50,500 --> 01:15:51,500 >> Yeah, sorry. 957 01:15:51,500 --> 01:15:52,500 Thank you. 958 01:15:52,500 --> 01:15:58,180 >> This is one of the things that I have been asking about for a while, and I appreciate 959 01:15:58,180 --> 01:15:59,180 the presentation. 960 01:15:59,180 --> 01:16:05,140 My question is, because normally we do have the large giant fire trucks or barricades 961 01:16:05,140 --> 01:16:11,500 manned by officers, which our public safety could be -- our trucks could be used in other 962 01:16:11,500 --> 01:16:13,620 purposes, other places. 963 01:16:13,620 --> 01:16:17,700 Do the removable bollards actually stop vehicles? 964 01:16:17,700 --> 01:16:22,140 Because one of my concerns for wanting to do this was to stop vehicles from plowing 965 01:16:22,140 --> 01:16:23,620 down large crowds. 966 01:16:23,620 --> 01:16:26,740 >> And it would depend on the type of bollard. 967 01:16:26,740 --> 01:16:28,860 There are light duty and heavy duty. 968 01:16:28,860 --> 01:16:37,500 So some of them are actually very stout and they extend into a base. 969 01:16:37,500 --> 01:16:43,260 So instead of a light duty bollard, which was the image I showed, simply bolting or 970 01:16:43,260 --> 01:16:49,140 locking into a lightweight plate, basically you have a cover and then you have a sleeve 971 01:16:49,140 --> 01:16:54,420 that goes down several feet into the roadway and you put a very strong, very robust bollard 972 01:16:54,420 --> 01:16:58,140 and those will stop most vehicles. 973 01:16:58,140 --> 01:17:04,020 Obviously if you have a concrete truck, we're out of luck, but for most passenger vehicles, 974 01:17:04,020 --> 01:17:05,020 those are enough. 975 01:17:05,020 --> 01:17:10,460 And it also depends on the spacing, you have to have the bollards close enough so that 976 01:17:10,460 --> 01:17:12,820 they actually impact more than one bollard. 977 01:17:12,820 --> 01:17:18,940 But yes, there are systems that will in fact prevent that vehicle from perversing beyond 978 01:17:18,940 --> 01:17:19,940 the bollard. 979 01:17:19,940 --> 01:17:20,940 >> Okay. 980 01:17:20,940 --> 01:17:23,540 Well, I personally am interested in exploring this further. 981 01:17:23,540 --> 01:17:29,660 I know we have several events, outdoor events where we close down the square, you know, 982 01:17:29,660 --> 01:17:37,220 pre-COVID and also when the weather gets nice where I think it would be worthy of more discussion. 983 01:17:37,220 --> 01:17:43,660 I don't know how that moves on or if this committee agrees to that or not, but that's 984 01:17:43,660 --> 01:17:44,660 my input. 985 01:17:44,660 --> 01:17:52,980 >> So if you have a desire, we can put together a true agenda item and not just a staff update 986 01:17:52,980 --> 01:17:59,020 and really start discussing where we want these bollards, again, a little bit more maybe 987 01:17:59,020 --> 01:18:03,780 about the type of bollard and the function that we want to do if we don't be able to 988 01:18:03,780 --> 01:18:08,180 stop a vehicle or if it's just we want to deter people from driving, those are two different 989 01:18:08,180 --> 01:18:09,180 functions. 990 01:18:09,180 --> 01:18:13,060 So we can bring that back as a full agenda item in a month or two. 991 01:18:13,060 --> 01:18:18,500 >> Yeah, I would support that if you want to, you know, get a majority. 992 01:18:18,500 --> 01:18:25,180 And just as a preliminary thought on where, I'm sure with more thought you'll refine this, 993 01:18:25,180 --> 01:18:30,900 but it seems like on the first blush you'd need to have it at each of the four sides 994 01:18:30,900 --> 01:18:37,060 of the intersections on each of the corners of the square, right, because, you know, it's 995 01:18:37,060 --> 01:18:42,340 going to vary when you need to shut down, you know, by event which throughout you need 996 01:18:42,340 --> 01:18:43,340 to preserve. 997 01:18:43,340 --> 01:18:50,700 So, you know, unless you -- yeah, I think it have to -- and then there may be application 998 01:18:50,700 --> 01:18:53,840 further down Hickory and industrial as well. 999 01:18:53,840 --> 01:18:55,700 >> Yeah, I agree with that. 1000 01:18:55,700 --> 01:19:00,380 I'm thinking about the car shows where it goes all the way, you know, to the corners 1001 01:19:00,380 --> 01:19:05,100 there for the -- just at the four corners around the square. 1002 01:19:05,100 --> 01:19:07,500 But then, you know, we have our downtown main street. 1003 01:19:07,500 --> 01:19:12,940 We have a lot of the boards and stuff, too, for downtown to look into this. 1004 01:19:12,940 --> 01:19:18,420 And so there's, you know, different possibilities for funding and input. 1005 01:19:18,420 --> 01:19:25,800 >> Yeah, I think I'd like to see a little bit more data on where we have been blocking 1006 01:19:25,800 --> 01:19:27,500 off for different functions in the past. 1007 01:19:27,500 --> 01:19:34,620 Is there specific places that get used, you know, 50% of the time or 70% of the time, 1008 01:19:34,620 --> 01:19:37,700 or is it always all over the place? 1009 01:19:37,700 --> 01:19:43,100 >> Yeah, Chamber of Main Street Association would probably be really useful. 1010 01:19:43,100 --> 01:19:49,860 But, yeah, the data and the input, yeah, maybe it's always out to the corners, but it just 1011 01:19:49,860 --> 01:19:54,700 seems to me that there are some situations where, for instance, you might want to keep 1012 01:19:54,700 --> 01:19:59,140 Elm and Locust open. 1013 01:19:59,140 --> 01:20:05,580 And maybe I'm making that up, but, you know, you're just cutting off the Oak and Hickory 1014 01:20:05,580 --> 01:20:11,140 parts, in which case then that changes where the bollards would have to be. 1015 01:20:11,140 --> 01:20:17,540 >> Okay, we're ready to continue. 1016 01:20:17,540 --> 01:20:20,380 >> Okay, carry on. 1017 01:20:20,380 --> 01:20:26,060 >> Okay, so back on the Alice -- this is the pedestrian access in the northeast corner 1018 01:20:26,060 --> 01:20:32,140 of Allison University, so if you're not familiar with this is what it looks like today, and 1019 01:20:32,140 --> 01:20:35,140 this photo is looking west. 1020 01:20:35,140 --> 01:20:40,900 So if you'll see, we've got a no pedestrian crossing here, but we've got PED indications 1021 01:20:40,900 --> 01:20:46,820 to go across university, but once they get to this university, there's literally nowhere 1022 01:20:46,820 --> 01:20:48,060 for them to go. 1023 01:20:48,060 --> 01:20:52,700 There's a raised curve behind, there's no sidewalk in either direction. 1024 01:20:52,700 --> 01:20:56,900 So it's kind of a trap, and it's been a problem for quite some time. 1025 01:20:56,900 --> 01:21:01,820 We've worked with Textot and the property owners over the last several months and have 1026 01:21:01,820 --> 01:21:09,060 developed a plan, which you can see here, which will allow somebody to cross the university, 1027 01:21:09,060 --> 01:21:15,060 travel east a little ways, and then this area, this becomes a landing ramp and allows them 1028 01:21:15,060 --> 01:21:18,300 to proceed into the retail area. 1029 01:21:18,300 --> 01:21:24,340 So again, we've been working with the property owners, everybody is on board with this, and 1030 01:21:24,340 --> 01:21:30,460 we are ready to move forward with construction, and it's a very inexpensive project, but again, 1031 01:21:30,460 --> 01:21:34,260 most of the concrete, most of the flat work is done, we're simply building the accessible 1032 01:21:34,260 --> 01:21:41,620 ramp, and we may -- I think there's another page of that, and after this, we do have some 1033 01:21:41,620 --> 01:21:47,700 markings, some paint behind this just to create kind of a safe zone and allow them to move 1034 01:21:47,700 --> 01:21:50,540 forward into the parking lot. 1035 01:21:50,540 --> 01:21:54,820 It's not a permanent solution, but it does at least get the -- someone's in a wheelchair 1036 01:21:54,820 --> 01:22:01,300 or a power chair, it gets them an opportunity to get off the roadway and continue on to 1037 01:22:01,300 --> 01:22:03,820 the destinations in that retail area. 1038 01:22:03,820 --> 01:22:07,500 Are there any questions? 1039 01:22:07,500 --> 01:22:08,500 >> No questions. 1040 01:22:08,500 --> 01:22:09,500 Just thank you. 1041 01:22:09,500 --> 01:22:12,140 Just a thank you for working on this. 1042 01:22:12,140 --> 01:22:13,140 >> This is a problem. 1043 01:22:13,140 --> 01:22:17,820 If it is a trap for pedestrians, especially if you're not that familiar with the area, 1044 01:22:17,820 --> 01:22:26,180 or you're unsighted, then there is literally nowhere for somebody to cross as they access 1045 01:22:26,180 --> 01:22:32,160 that Northside University. 1046 01:22:32,160 --> 01:22:36,300 So the next one is some of the project that we were working on a couple weeks ago, we've 1047 01:22:36,300 --> 01:22:42,700 got the early polling places done, basically preparing some maps because of the construction 1048 01:22:42,700 --> 01:22:49,820 and because of a lot of other access restrictions that we've been placing on ourselves, we developed 1049 01:22:49,820 --> 01:22:57,820 some maps to -- where they're on the website to direct travelers to the polling location. 1050 01:22:57,820 --> 01:23:02,260 So this is a typical -- basically you click on that and you'll be able to see your direction 1051 01:23:02,260 --> 01:23:09,220 of preferred direction of travel if you want to access the civic center in this case, and 1052 01:23:09,220 --> 01:23:13,580 these are the primary roadways that we recommend. 1053 01:23:13,580 --> 01:23:31,980 And so we have those for each and every polling location, and I think -- here's the -- we'll 1054 01:23:31,980 --> 01:23:36,460 have a list of the polling locations and you click on those and you get a directional map. 1055 01:23:36,460 --> 01:23:41,260 So this is something that we're developing for this year, and I think we'll probably 1056 01:23:41,260 --> 01:23:47,940 want to continue that for all of the Election Day activities moving forward. 1057 01:23:47,940 --> 01:23:57,100 And then the last one I have is the Senior Transportation Planner/ADA coordinator position 1058 01:23:57,100 --> 01:23:58,540 update. 1059 01:23:58,540 --> 01:24:06,780 We were positioned to go to posting the week of the 19th of October, however, we're reworking, 1060 01:24:06,780 --> 01:24:14,620 retuning the titling of this so that we can -- there are some grant funding opportunities 1061 01:24:14,620 --> 01:24:20,140 that are linked to a title that has the word "bicycle" or "bike" in it, so we're going 1062 01:24:20,140 --> 01:24:25,300 to add that element, and then we will be posting this position the first week of November, 1063 01:24:25,300 --> 01:24:28,540 I believe, early in November. 1064 01:24:28,540 --> 01:24:33,900 Again, this is going to be a difficult position to fill, so we will leave this open until 1065 01:24:33,900 --> 01:24:39,800 we actually fill it so that we can have the maximum exposure to the candidate pool, but 1066 01:24:39,800 --> 01:24:42,420 -- >> Why do you think it's going to be difficult 1067 01:24:42,420 --> 01:24:44,620 to fill? 1068 01:24:44,620 --> 01:24:47,840 >> It's an unusual combination of skill sets. 1069 01:24:47,840 --> 01:24:55,260 What we're trying to do is add the ADA coordinator as a specific requirement in addition to the 1070 01:24:55,260 --> 01:25:01,020 bike ped and some more standard transportation planning elements. 1071 01:25:01,020 --> 01:25:10,420 We're trying to beef up the -- well, I have a better word, the skill set, the tools that 1072 01:25:10,420 --> 01:25:19,180 this person brings, we're adding some responsibilities and some duties that we currently don't have 1073 01:25:19,180 --> 01:25:20,180 in our toolbox. 1074 01:25:20,180 --> 01:25:26,740 So we need a dedicated transportation planner that also does bike and ped coordination, 1075 01:25:26,740 --> 01:25:33,820 and that can do ADA review and ADA planning for the city in the right of way. 1076 01:25:33,820 --> 01:25:39,580 This particular ADA coordinator would be responsible for public right of way, not facilities and 1077 01:25:39,580 --> 01:25:40,580 not parks. 1078 01:25:40,580 --> 01:25:43,100 So it's the roadway right of way. 1079 01:25:43,100 --> 01:25:49,820 How do we make sure that our pedestrian and bicycle infrastructure is adequate? 1080 01:25:49,820 --> 01:25:56,100 We talked a little bit last time about the ADA transition plan that we have in the past, 1081 01:25:56,100 --> 01:26:00,700 and that's an element that will certainly be in the purview of this person, and it's 1082 01:26:00,700 --> 01:26:06,300 the execution of the improvements that are required to bring our existing pedestrian 1083 01:26:06,300 --> 01:26:09,780 and ADA infrastructure into compliance. 1084 01:26:09,780 --> 01:26:15,780 So again, we're just adding some responsibilities and some different duties that this position 1085 01:26:15,780 --> 01:26:22,740 didn't have before, and so it's -- and they're all important, and so the bike/ped is obviously 1086 01:26:22,740 --> 01:26:27,380 important, the ADA coordinator part is important, and that transportation planner, we're talking 1087 01:26:27,380 --> 01:26:32,460 about roadway projects and bringing all that complete street elements and the vision zero 1088 01:26:32,460 --> 01:26:35,460 elements in. 1089 01:26:35,460 --> 01:26:42,260 It's a limited pool of applicants who are going to have all of these skill sets. 1090 01:26:42,260 --> 01:26:46,620 I have a question, Brian -- or, Chair, may I? 1091 01:26:46,620 --> 01:26:47,620 Okay. 1092 01:26:47,620 --> 01:26:48,620 Go ahead. 1093 01:26:48,620 --> 01:26:49,620 Okay. 1094 01:26:49,620 --> 01:26:50,620 Thank you for adding to this. 1095 01:26:50,620 --> 01:26:55,980 I know that we had some questions and concerns about not having that bike/ped part in there 1096 01:26:55,980 --> 01:27:01,620 where we couldn't get funding or designation for a bicycle-friendly community, which, you 1097 01:27:01,620 --> 01:27:05,780 know, if we're looking at livability, that's one of the things that we've discovered is, 1098 01:27:05,780 --> 01:27:10,020 you know, a priority for some people. 1099 01:27:10,020 --> 01:27:15,580 Is it possible because -- I mean, this could be, you know, a staffing issue, but since 1100 01:27:15,580 --> 01:27:22,460 it's hard to find both of those in one person, is it possible to have the bike person under 1101 01:27:22,460 --> 01:27:23,460 the ADA person? 1102 01:27:23,460 --> 01:27:30,700 I mean, are we trying to create something that doesn't exist with this job listing? 1103 01:27:30,700 --> 01:27:35,820 I mean, it would be -- if we're making it more difficult to hire somebody, I'm just 1104 01:27:35,820 --> 01:27:36,820 -- I'm curious. 1105 01:27:36,820 --> 01:27:42,260 But would it be easier to have two or try to push it? 1106 01:27:42,260 --> 01:27:46,820 I'd like three, but we have -- that's our problem is we're limited right now to one 1107 01:27:46,820 --> 01:27:56,940 FTE, one position, and I don't think any of those three categories is a full-time job, 1108 01:27:56,940 --> 01:28:03,300 and the only concern I have is if we start adding and we have all three of them in there, 1109 01:28:03,300 --> 01:28:07,740 that does become a very full position, very -- a lot of responsibilities. 1110 01:28:07,740 --> 01:28:14,900 So the answer to your question would be yes, it would be better if we had two, but I don't 1111 01:28:14,900 --> 01:28:15,900 believe we do. 1112 01:28:15,900 --> 01:28:23,380 And so we're trying to add as much as we can and still make that job doable. 1113 01:28:23,380 --> 01:28:24,380 I think it's worth a try. 1114 01:28:24,380 --> 01:28:31,060 It's not a pure unicorn, because it's like basically all the non-automotive right now. 1115 01:28:31,060 --> 01:28:34,340 >> I imagine that does come up elsewhere, too. 1116 01:28:34,340 --> 01:28:43,580 >> One of the reasons we wanted to add the planner portion to it is because if we listed 1117 01:28:43,580 --> 01:28:48,740 it as a bike/ped coordinator, then the people who have the skill set that we're looking 1118 01:28:48,740 --> 01:28:52,960 for probably won't apply, because it's not -- that's not what they want to do. 1119 01:28:52,960 --> 01:28:54,660 That's not what their skill set is. 1120 01:28:54,660 --> 01:28:59,500 They're more -- they're planners with the transportation specialization, yes, they can 1121 01:28:59,500 --> 01:29:03,780 do bike/ped, because that's all the complete streets, context-sensitive, vision zero stuff 1122 01:29:03,780 --> 01:29:09,660 that they do, but then we're also adding that ADA coordinator piece, and that's the part 1123 01:29:09,660 --> 01:29:16,760 that most planners won't have, and so we're going to have to find -- I know of two people 1124 01:29:16,760 --> 01:29:22,860 that are probably adequate and their skill set is enough to fill what we're looking for, 1125 01:29:22,860 --> 01:29:28,020 but it's -- the transportation planner piece really does incorporate the bike/ped stuff, 1126 01:29:28,020 --> 01:29:33,020 so I'm not -- I don't have a problem with the title and making sure that we include that, 1127 01:29:33,020 --> 01:29:37,620 but most transportation planners are not ADA specialists, so that's the unicorn, if there 1128 01:29:37,620 --> 01:29:43,700 is one, of a piece that makes it kind of a unicorn is that adding that ADA coordinator, 1129 01:29:43,700 --> 01:29:51,700 but that is an important piece for our -- this position, that's a -- we need an ADA coordinator 1130 01:29:51,700 --> 01:29:57,420 who will be looking at all the developments that's coming in, our city projects, and managing 1131 01:29:57,420 --> 01:30:03,020 that ADA transition plan to bring our infrastructure into compliance. 1132 01:30:03,020 --> 01:30:04,580 >> So chair -- question? 1133 01:30:04,580 --> 01:30:05,580 >> Okay. 1134 01:30:05,580 --> 01:30:06,580 >> Okay. 1135 01:30:06,580 --> 01:30:11,740 So I know my -- part of my concern is the timing, because, you know, we've been without 1136 01:30:11,740 --> 01:30:15,580 for a little bit, and then all the plans are coming up, and it's a good time to have somebody 1137 01:30:15,580 --> 01:30:19,500 here to help us review them. 1138 01:30:19,500 --> 01:30:27,100 You talked about the ADA coordination, or how difficult is that to get? 1139 01:30:27,100 --> 01:30:32,540 Would it be, like, you could hire somebody who has mostly everything, but is -- I mean, 1140 01:30:32,540 --> 01:30:34,780 is it like a four-year college? 1141 01:30:34,780 --> 01:30:38,420 I just -- I don't know about the certification for that. 1142 01:30:38,420 --> 01:30:41,660 Is it a difficult thing to get? 1143 01:30:41,660 --> 01:30:42,660 >> It is -- it's not. 1144 01:30:42,660 --> 01:30:47,180 It's just -- and we talked a little bit about this at the Committee on Persons with Disabilities 1145 01:30:47,180 --> 01:30:55,580 last month, and I think we got agreement that those certifications is -- that's something 1146 01:30:55,580 --> 01:30:58,580 that we can teach to the right person. 1147 01:30:58,580 --> 01:31:03,380 If we can find the right candidate who has the skill set and has the basic knowledge 1148 01:31:03,380 --> 01:31:06,340 of ADA, we can get those certifications. 1149 01:31:06,340 --> 01:31:09,780 It might take several months to get the ones that -- all of the certifications that we 1150 01:31:09,780 --> 01:31:11,700 want, or maybe even longer. 1151 01:31:11,700 --> 01:31:15,380 It just depends on when they're available for application, when they can attend those 1152 01:31:15,380 --> 01:31:19,540 certifications, but certainly something that's teachable. 1153 01:31:19,540 --> 01:31:23,820 It's really just -- if we could find somebody that has all three, great. 1154 01:31:23,820 --> 01:31:28,820 If we can't, then I think the direction we got from the Committee was, well, find the 1155 01:31:28,820 --> 01:31:34,900 right person who has the bike/ped stuff, who is a transportation planner, who knows the 1156 01:31:34,900 --> 01:31:39,700 mobility part of it, and then we will train them on the ADA coordinator piece. 1157 01:31:39,700 --> 01:31:40,700 >> Okay. 1158 01:31:40,700 --> 01:31:42,580 Thank you for sharing their comments. 1159 01:31:42,580 --> 01:31:43,580 Appreciate it. 1160 01:31:43,580 --> 01:31:49,660 >> You need to be a good community outreach person, too, just vocalizing certificates. 1161 01:31:49,660 --> 01:31:52,580 >> That was one of our requirements is personality. 1162 01:31:52,580 --> 01:31:57,480 How well does this person deal with crowds and making presentations, et cetera, and that's 1163 01:31:57,480 --> 01:31:58,820 an important piece as well. 1164 01:31:58,820 --> 01:32:03,420 Somebody -- there's got to be somebody who can interact with this community. 1165 01:32:03,420 --> 01:32:07,220 >> These are two of the toughest crowds in Nascar traffic. 1166 01:32:07,220 --> 01:32:10,980 Two of the toughest crowds in Denver. 1167 01:32:10,980 --> 01:32:13,600 >> Yes, they are. 1168 01:32:13,600 --> 01:32:14,600 That's all I had. 1169 01:32:14,600 --> 01:32:19,460 >> Any other questions before we go to concluding items? 1170 01:32:19,460 --> 01:32:20,460 >> No. 1171 01:32:20,460 --> 01:32:21,460 That was a lot. 1172 01:32:21,460 --> 01:32:22,460 Thank you. 1173 01:32:22,460 --> 01:32:23,460 >> Great. 1174 01:32:23,460 --> 01:32:24,460 Lots of progress. 1175 01:32:24,460 --> 01:32:25,460 Okay. 1176 01:32:25,460 --> 01:32:29,180 Anybody have any concluding items? 1177 01:32:29,180 --> 01:32:30,180 >> I do. 1178 01:32:30,180 --> 01:32:31,180 >> Please. 1179 01:32:31,180 --> 01:32:32,780 >> Of course. 1180 01:32:32,780 --> 01:32:39,500 So I've seen pictures of cars continuing to park on Hickory Street in the bike lane, and 1181 01:32:39,500 --> 01:32:43,260 the bollards are spread out pretty far. 1182 01:32:43,260 --> 01:32:48,860 I'm just wondering what we could do to add a few more bollards there to -- I mean, if 1183 01:32:48,860 --> 01:32:55,080 they're there to keep cars out and keep bikes safe, then obviously there's something not 1184 01:32:55,080 --> 01:32:56,820 working. 1185 01:32:56,820 --> 01:32:57,820 What would that take? 1186 01:32:57,820 --> 01:33:02,900 Does that have to come back through this committee, or is it a funding issue? 1187 01:33:02,900 --> 01:33:06,020 Just a little bit -- maybe a report on that. 1188 01:33:06,020 --> 01:33:10,860 And then the next thing is the Carroll Boulevard Road Diet. 1189 01:33:10,860 --> 01:33:17,220 I know it was on the matrix for a while, and we kind of glanced over it a little bit in 1190 01:33:17,220 --> 01:33:25,820 the one-way street discussion, but we never really had a full presentation on it. 1191 01:33:25,820 --> 01:33:28,120 And I'm just wondering a date on that. 1192 01:33:28,120 --> 01:33:35,260 Maybe it's after the mobility plan, or just a timeline on when a good time to have that 1193 01:33:35,260 --> 01:33:37,900 discussion would be. 1194 01:33:37,900 --> 01:33:39,260 That's it. 1195 01:33:39,260 --> 01:33:40,660 >> Okay. 1196 01:33:40,660 --> 01:33:42,260 John, anything? 1197 01:33:42,260 --> 01:33:43,260 >> No. 1198 01:33:43,260 --> 01:33:44,260 I'm good. 1199 01:33:44,260 --> 01:33:45,260 >> Good. 1200 01:33:45,260 --> 01:33:49,220 All right. 1201 01:33:49,220 --> 01:33:52,140 I had one, but Kaley did it already. 1202 01:33:52,140 --> 01:33:55,860 So let's adjourn at 10.35. 1203 01:33:55,860 --> 01:33:56,860 Bye. 1204 01:33:56,860 --> 01:33:57,860 >> Bye. 1205 01:33:57,860 --> 01:33:59,860 Thank you.