1 00:00:00,000 --> 00:00:13,100 We do have a quorum. It's 9.02 and we're going to call to order the Public Utilities Board 2 00:00:13,100 --> 00:00:22,600 of the City of Denton for July 27th, 2020. The first item on the agenda and I'm going 3 00:00:22,600 --> 00:00:30,480 to pull item A that will give Billy an opportunity to not vote or abstain from the vote. Does 4 00:00:30,480 --> 00:00:38,360 any board member wish to pull another item? What item did you say, Susan? E. Yeah, C is 5 00:00:38,360 --> 00:00:52,240 in Charlie. And I had a couple of brief questions on A and B. A and D is in Donald? No, B is 6 00:00:52,240 --> 00:01:05,880 in boy. Okay. Oh, and also F. Sorry. All right. So Susan, or I guess Larry, do I need to just 7 00:01:05,880 --> 00:01:10,600 leave the meeting and then get Kim to let me back on after this discussion? Correct. 8 00:01:10,600 --> 00:01:19,800 Okay, so I'm not sure how that's going to work and when she'll tell me it's over. She 9 00:01:19,800 --> 00:01:36,040 can email you or text you. Okay. So. So then we have item D. You wanna go backwards? Could 10 00:01:36,040 --> 00:01:43,480 we approve item D? Motion to approve. I move we approve item D. I'll second. All in favor 11 00:01:43,480 --> 00:01:54,880 say aye. Aye. Opposed? Okay. Why don't we do item E first so that Billy can get off 12 00:01:54,880 --> 00:02:04,320 and then we'll come back in and he can hear the rest of the discussion. I didn't really 13 00:02:04,320 --> 00:02:08,640 have any questions on it. I just knew that we needed to give Billy the opportunity to. 14 00:02:08,640 --> 00:02:15,920 Yeah, I have a question, Susan. Okay. On the spreadsheet that shows a summary of the bid 15 00:02:15,920 --> 00:02:23,920 amounts, there are dollars shown, there are quantities shown, but there are no units of 16 00:02:23,920 --> 00:02:34,640 measure shown. So that needs to be shown. For instance, there are 740 something at a 17 00:02:34,640 --> 00:02:43,120 price of so many dollars, but the units of measure are not described on the sheet. We 18 00:02:43,120 --> 00:02:47,360 have Laurie Huell. She's our purchasing manager. She's on the on the line. She may be able 19 00:02:47,360 --> 00:02:56,120 to give some insight on that. Hi, yes. Laurie Huell, purchasing manager. We can add that 20 00:02:56,120 --> 00:03:02,040 to there and send it out to you. Yeah, we need to see that. That's an important piece 21 00:03:02,040 --> 00:03:15,920 of information. Okay. That's all I had. Do we have a moment to move the item? One silly 22 00:03:15,920 --> 00:03:36,200 question. What does PEC stand for? PEC stands for Pecan Creek. That's just part of a drainage 23 00:03:36,200 --> 00:03:47,020 area within the city. EEC4. Okay. That's just one of the branches of the concrete drainage 24 00:03:47,020 --> 00:03:52,160 ways through the city. I don't feel as stupid for not knowing what that was. That's okay. 25 00:03:52,160 --> 00:04:05,880 I'll move approval. Second. All in favor say aye. Aye. Okay. We can get Billy back on. 26 00:04:05,880 --> 00:04:28,520 I've got it, Doc. Hold on. 27 00:04:28,520 --> 00:04:56,320 Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. 28 00:04:56,320 --> 00:05:25,800 I'm sorry. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. 29 00:05:25,800 --> 00:05:52,000 Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. 30 00:05:52,000 --> 00:06:17,200 Okay. Okay. Okay. Okay. Okay. And he's back. Okay. Item A. Karen, what was your question? 31 00:06:17,200 --> 00:06:22,520 Yeah, I just had a quick question clarification on A and B. So maybe we can vote on both of 32 00:06:22,520 --> 00:06:31,160 those. I just wanted to clarify that if a vendor is on the pre-qualified list that then 33 00:06:31,160 --> 00:06:39,240 it doesn't go out for bids. Is that why these two items didn't go out for bids? Or we don't 34 00:06:39,240 --> 00:06:46,360 have a bid list at any rate. That's correct. Ms. Huell is on the phone as well. She'd be 35 00:06:46,360 --> 00:06:53,520 able to explain that. And we should have someone from solid waste as well. Okay. Just clarification 36 00:06:53,520 --> 00:07:01,000 of policy here. Sure. Yeah, that's correct. When they use the pre-qualified list where 37 00:07:01,000 --> 00:07:07,400 we sent the RFQ request for qualifications out, and then we brought that list to council. 38 00:07:07,400 --> 00:07:14,000 Here's all the firms that were pre-qualified. If they're using someone from the pre-qualified 39 00:07:14,000 --> 00:07:21,120 list, we do not have to do another RFQ. Thanks. Just wanted that sort of to clear my head. 40 00:07:21,120 --> 00:07:26,880 So I would move for approval of A and B, unless anybody else has questions? 41 00:07:26,880 --> 00:07:36,400 Carolee, did you have a question? One quick question on item A. That's a pretty stout 42 00:07:36,400 --> 00:07:42,920 amount for engineering and design services for a project. Do we have a ballpark idea 43 00:07:42,920 --> 00:07:50,720 how much the total expenditure for the public disposal area is going to be? 44 00:07:50,720 --> 00:08:00,640 This is Tina Eck, the senior business analyst for solid waste recycling. Part of the design 45 00:08:00,640 --> 00:08:08,400 process will be to determine that full build, the full construction cost for the facility. 46 00:08:08,400 --> 00:08:13,120 So you don't have a budget number? The budget number would essentially be that 47 00:08:13,120 --> 00:08:18,240 design services, if you estimate that being about eight to 10% of the total construction 48 00:08:18,240 --> 00:08:25,000 cost. Okay. So does that mean that rough numbers 49 00:08:25,000 --> 00:08:34,240 you're thinking about spending a million and a half dollars for a public disposal facility? 50 00:08:34,240 --> 00:08:38,760 That would be our estimate at this time, yes, until we get that design estimate back from 51 00:08:38,760 --> 00:08:45,600 Biggs and Matthews. Okay. I'll just note that that seems like an 52 00:08:45,600 --> 00:08:52,520 awful lot of expenditure for something we already own the land for. And maybe I'm missing 53 00:08:52,520 --> 00:08:57,520 what's included in the design facility, but I am concerned about the level of expenditure 54 00:08:57,520 --> 00:09:02,240 for that. The disposal facility will be where all of 55 00:09:02,240 --> 00:09:07,080 our public traffic is routed. So if you think non-commercial traffic, it's meant to be a 56 00:09:07,080 --> 00:09:12,600 safety improvement as well as a process improvement to get all of our smaller traffic vehicles 57 00:09:12,600 --> 00:09:18,840 away from the booking space site and to have them an area to essentially deliver their 58 00:09:18,840 --> 00:09:24,800 trash to more safely. So it's not just for the, say, recycling drop-off. It'll be more 59 00:09:24,800 --> 00:09:29,720 expensive than that. Mr. Parker, I think there's also going to 60 00:09:29,720 --> 00:09:36,080 be expenses on flat work, concrete work, as Tana mentioned, rerouting that to separate 61 00:09:36,080 --> 00:09:41,160 commercial and residential traffic. So there'll be a lot of concrete work, probably a building 62 00:09:41,160 --> 00:09:46,680 of some sorts to be able to accommodate those folks that come through. So there will be 63 00:09:46,680 --> 00:09:52,120 an expense. So it's probably well over a million and a half dollars to do that kind of work, 64 00:09:52,120 --> 00:09:55,000 even though we own the property, but it's just a construction work that's going to go 65 00:09:55,000 --> 00:09:59,800 along with it. Okay. Thank you. All right. We had a motion 66 00:09:59,800 --> 00:10:02,560 by Karen. Do we have a second? Second. 67 00:10:02,560 --> 00:10:06,000 All in favor, say aye. Aye. 68 00:10:06,000 --> 00:10:11,240 All opposed? I'll go opposed on that, please. 69 00:10:11,240 --> 00:10:17,200 Okay. So just to clarify, my motion was for both 70 00:10:17,200 --> 00:10:25,360 A and B. Right. I think Charlie is just objecting to A. That's correct. 71 00:10:25,360 --> 00:10:33,720 Should we have another vote on B? I'm good with B, if we want to formalize that. 72 00:10:33,720 --> 00:10:36,160 Larry had. Let's just go ahead. Since they were pulled 73 00:10:36,160 --> 00:10:41,560 off consent, take individual votes. Okay. Okay. So I move for approval of B. 74 00:10:41,560 --> 00:10:49,400 Second. Okay. All in favor, say aye. 75 00:10:49,400 --> 00:10:55,400 Aye. Opposed? Okay. Are we good? 76 00:10:55,400 --> 00:11:08,000 Then item C. Yes, I had a question about that. This is not so much about the cost here described, 77 00:11:08,000 --> 00:11:16,240 but rather the event that happened that we had to clean up and repair and so forth. I'd 78 00:11:16,240 --> 00:11:24,680 like to ask some questions about that. Mainly, did we – did anyone ever create any kind 79 00:11:24,680 --> 00:11:33,600 of a root cause analysis or report on why and how that failure happened? That's a question 80 00:11:33,600 --> 00:11:39,880 for management, not really for the purchasing department. Sure. We've got Ken Banks on 81 00:11:39,880 --> 00:11:45,040 the phone who should be able to answer those specifics on what happened in that – on 82 00:11:45,040 --> 00:11:49,680 that incident. Good morning, board members. Can you hear 83 00:11:49,680 --> 00:11:50,680 me? Morning, yes. 84 00:11:50,680 --> 00:11:58,960 Yes, good morning, everyone. To answer the question, yes, we did. We went back and took 85 00:11:58,960 --> 00:12:05,080 a look at exactly what happened. In reconstructing those events, sometimes it's difficult to 86 00:12:05,080 --> 00:12:11,840 tell. We basically had a catastrophic failure at the bell housing of the pump. We believe 87 00:12:11,840 --> 00:12:19,360 that that was caused by a water hammer event that likely happened with an interruption 88 00:12:19,360 --> 00:12:26,120 of electrical service out there briefly and corresponding water hammer event that went 89 00:12:26,120 --> 00:12:32,640 down the line. Basically, those rebounded, came back, and caused the bell housing to 90 00:12:32,640 --> 00:12:40,680 lose integrity. So we believe that that is what caused the problem. I can tell you also 91 00:12:40,680 --> 00:12:47,760 that we have – we've got a brand-new pump station going in there. It's nearing the 92 00:12:47,760 --> 00:12:53,760 end of completion of construction. We've got a few more things to do on the piping. 93 00:12:53,760 --> 00:12:59,880 We've really focused our efforts on trying to ensure that we have redundancy and bypass 94 00:12:59,880 --> 00:13:07,360 options that do not require us to cross Old Alton Street near the bridge. If you recall, 95 00:13:07,360 --> 00:13:14,040 we had to bypass and basically go to the live station for Upper Trinity to pump the waste 96 00:13:14,040 --> 00:13:22,000 until the repair was effective. Now we have a bypass with a direct pipe in that will allow 97 00:13:22,000 --> 00:13:28,540 us to use an on-site emergency pump and continue to operate the force main if we have a catastrophic 98 00:13:28,540 --> 00:13:36,200 failure in the new live station. So we've got a much more redundant system in place 99 00:13:36,200 --> 00:13:42,560 now with the new live station, and we have the ability now to do a very high level of 100 00:13:42,560 --> 00:13:47,800 bypass without having to cross the street. So we feel like we've got a reasonable idea 101 00:13:47,800 --> 00:13:55,720 about what caused the event, and it was something that really couldn't have been managed for 102 00:13:55,720 --> 00:14:01,560 effectively. The new pumps will be able to handle that in a much more better fashion. 103 00:14:01,560 --> 00:14:07,880 And then at the same time, we really focused on ensuring that we had on-site bypass capabilities 104 00:14:07,880 --> 00:14:14,160 so that we could respond to an event like that again much more rapidly and without having 105 00:14:14,160 --> 00:14:19,160 to cause the inconvenience for citizens of us having to cross the street. 106 00:14:19,160 --> 00:14:29,320 Okay. That's good, Ken. I guess my question is more a matter of internal processes and 107 00:14:29,320 --> 00:14:35,760 the department for future – the future knowledge of future employees and so forth here. If 108 00:14:35,760 --> 00:14:42,000 there's something here that can be learned, that can be documented, it would benefit people 109 00:14:42,000 --> 00:14:48,360 down the road to know how this – exactly how this happened, how we think it happened, 110 00:14:48,360 --> 00:14:51,440 and what could be done. 111 00:14:51,440 --> 00:14:58,040 Absolutely. Yeah, and that's definitely something that we can put together. It's – the issue 112 00:14:58,040 --> 00:15:02,880 is it's not going to – with the new live station and the new pumps, we don't feel 113 00:15:02,880 --> 00:15:07,760 like we're going to have a similar event, but we have documented what we felt was the 114 00:15:07,760 --> 00:15:16,000 cause of the situation. And certainly, we're in process now of trying to coalesce all those 115 00:15:16,000 --> 00:15:21,280 post-event documents and really trying to get those into a centralized location. And 116 00:15:21,280 --> 00:15:24,800 this will be one of those documents that we add. 117 00:15:24,800 --> 00:15:30,880 Yeah, I would suggest that if we – if we don't already have a written procedure or 118 00:15:30,880 --> 00:15:37,640 policy about doing a formal root cause analysis whenever we have a failure that results in 119 00:15:37,640 --> 00:15:41,960 a permit violation – this was a permit violation, right, of our – 120 00:15:41,960 --> 00:15:51,880 That – yes, that is correct. It resulted in a sanitary sewer overflow, so it is – absolutely. 121 00:15:51,880 --> 00:15:58,800 So I guess my suggestion is simply this. If we don't have a formal written policy or 122 00:15:58,800 --> 00:16:06,240 procedure for initiating an investigation on something like this, then I think we should 123 00:16:06,240 --> 00:16:12,880 think about creating a policy or a procedure that would require it to be done whenever 124 00:16:12,880 --> 00:16:18,760 there's a failure like this that results in a permit violation or some other big event 125 00:16:18,760 --> 00:16:24,040 that happens. That's my – that's really my thought and my suggestion in this. 126 00:16:24,040 --> 00:16:29,840 Yes, absolutely. We have – we definitely have standard operating procedures that require 127 00:16:29,840 --> 00:16:36,640 an investigation for any on-site sanitary sewer overflow that we have. I will review 128 00:16:36,640 --> 00:16:41,440 those and make sure that we have something in there that talks about lift station failures 129 00:16:41,440 --> 00:16:46,680 in particular. I am pretty sure that we do, but I will go back and verify that. If we 130 00:16:46,680 --> 00:16:50,360 don't, we'll get that added to our existing SOP. 131 00:16:50,360 --> 00:16:54,720 Yeah, okay. That's my only concern. With that said, I move – 132 00:16:54,720 --> 00:17:01,280 Wait, Barbara has her hand up. Now, wasn't Hickory Creek the one we just 133 00:17:01,280 --> 00:17:07,920 did a lot of work on and replacing stuff? Am I – is my timeframe correct or is the 134 00:17:07,920 --> 00:17:13,880 work not completed? Yes, ma'am, you're absolutely correct. We've 135 00:17:13,880 --> 00:17:22,600 got a new lift station there now. It is in – it is nearing completion for its construction. 136 00:17:22,600 --> 00:17:28,240 We anticipate on having that online. We're doing a few more bypass options, so it's 137 00:17:28,240 --> 00:17:33,280 taking a little bit longer. We had originally thought that it would be done at the – near 138 00:17:33,280 --> 00:17:38,280 the end of the summer. We're looking at a date now of into the fall, and that's simply 139 00:17:38,280 --> 00:17:43,000 because we're adding a couple more options to that system to allow us to more effectively 140 00:17:43,000 --> 00:17:46,560 bypass. Okay, and secondly, I didn't see anything 141 00:17:46,560 --> 00:17:55,320 about a fine, which usually – was it because it was reported so quickly or – 142 00:17:55,320 --> 00:18:00,760 We have not received any information from the TCQ indicating that we have – we will 143 00:18:00,760 --> 00:18:07,880 incur a fine. They have taken all of the information. We were in contact with them during the entire 144 00:18:07,880 --> 00:18:14,440 event from the – right after it happened through all of the information exchanged with 145 00:18:14,440 --> 00:18:20,560 them as we facilitated the repair. We feel that we did a very good and very responsive 146 00:18:20,560 --> 00:18:25,880 job. I believe they feel that as well. So we have not gotten any communication from 147 00:18:25,880 --> 00:18:32,920 them since the event that they are anticipating a fine. It's a possibility. It always is, 148 00:18:32,920 --> 00:18:38,600 but I think that it's likely the look at this is just simply a force – or a catastrophic 149 00:18:38,600 --> 00:18:44,280 event that we had no control over. Well, that's good. I was also glad to see 150 00:18:44,280 --> 00:18:50,760 that local vendors were used on this job. I always like to see that. 151 00:18:50,760 --> 00:18:54,120 Yes, ma'am. Ed has a question. 152 00:18:54,120 --> 00:19:00,360 Yeah. Ken, I have a question. You used the term – I think you said water hammer? 153 00:19:00,360 --> 00:19:03,800 Yes. What – can you tell me what a water hammer 154 00:19:03,800 --> 00:19:10,080 is, please? Yes, it's a pressure wave that is caused by 155 00:19:10,080 --> 00:19:20,040 a quick turnoff and turn on, if you will, of the flow of water through a pipe. It creates 156 00:19:20,040 --> 00:19:26,240 a pressure wave that has a tendency to move down the pipe and then come back and can cause 157 00:19:26,240 --> 00:19:32,920 some pretty significant pressure on the pipe when it encounters the – a valve, for example, 158 00:19:32,920 --> 00:19:38,920 or any other type of obstruction of flow. An example would be if you've ever had a 159 00:19:38,920 --> 00:19:43,760 bathtub where you turn on the hot water and turn it on real – or turn it off real fast 160 00:19:43,760 --> 00:19:47,680 in the pipe rattles. That's a small water hammer. 161 00:19:47,680 --> 00:19:52,160 Okay. Thank you very much. Sure. 162 00:19:52,160 --> 00:19:55,480 Any other questions? Charlie? 163 00:19:55,480 --> 00:20:02,000 I would like to move approval, and I would also ask that we note our thanks to the people 164 00:20:02,000 --> 00:20:07,360 who dealt with the triage on this event. I'm guessing there was some really nasty work 165 00:20:07,360 --> 00:20:12,720 that took place, and on behalf of the citizens, tell those people thanks. 166 00:20:12,720 --> 00:20:18,000 Second. All right. We have a motion and a second. 167 00:20:18,000 --> 00:20:20,800 All in favor, say aye. Aye. 168 00:20:20,800 --> 00:20:25,520 Ghost? Carries. I can't remember who pulled F. Is that you, Russ? 169 00:20:25,520 --> 00:20:33,600 No, that was me. I'm sure Russ has a question as well. But I just had a quick – another 170 00:20:33,600 --> 00:20:43,080 quick clarification. So for this contract with Genscape, I was just wondering if there 171 00:20:43,080 --> 00:20:47,080 was any software involved that would need tech support, or if tech support was part 172 00:20:47,080 --> 00:20:55,880 of the contract. I didn't notice it listed. Or is this just a sort of information feed 173 00:20:55,880 --> 00:21:05,360 that we're contracting them for? And the software is our own responsibility. 174 00:21:05,360 --> 00:21:11,640 Terry Lutrick – excuse me. Terry Nolte, excuse me, will be able to give you some insight 175 00:21:11,640 --> 00:21:18,720 on that as well. You're muted. 176 00:21:18,720 --> 00:21:24,160 Good morning, Terry Nolte, Assistant General Manager, Amy. So Genscape is a data feed. 177 00:21:24,160 --> 00:21:33,200 It provides us with relevant market information about the generating status of all the generation 178 00:21:33,200 --> 00:21:41,920 units in haircut market. It's a piece of software that we have had under contract for 179 00:21:41,920 --> 00:21:46,280 a number of years, and this is a renewal of that contract. It's critical information 180 00:21:46,280 --> 00:21:51,640 for us to put together our bids and offers into the day ahead in real-time markets. 181 00:21:51,640 --> 00:21:59,920 Yeah. So is – I mean, do you anticipate any need for tech support or upgrades or anything 182 00:21:59,920 --> 00:22:02,440 like that? I think this is a four-year contract. 183 00:22:02,440 --> 00:22:11,080 Yes, it is a – I believe it's a three-year with two one-year extensions. As I said, we've 184 00:22:11,080 --> 00:22:15,480 had this piece of software in place for a number of years. It's the kind of Cadillac 185 00:22:15,480 --> 00:22:25,000 of systems available in – throughout North America, and it's supported primarily by 186 00:22:25,000 --> 00:22:29,880 the vendor. Any software upgrades are just pushed to us by the vendor. 187 00:22:29,880 --> 00:22:33,200 Okay. So it does include upgrades and – 188 00:22:33,200 --> 00:22:34,200 Yes, ma'am. 189 00:22:34,200 --> 00:22:39,040 Okay. Thank you. Any other questions? 190 00:22:39,040 --> 00:22:46,760 Honestly, I do have a question. Terry, this – it's described as a sole source. The 191 00:22:46,760 --> 00:22:51,760 only ones that can do this, that's this group here, do they not have any competition 192 00:22:51,760 --> 00:22:59,920 at all? Because I'm wondering if, from what I read in the description, they're taking 193 00:22:59,920 --> 00:23:06,880 information that's available from other locations and basically compiling it and making it easier 194 00:23:06,880 --> 00:23:10,120 and quicker for you to use. Is that right? 195 00:23:10,120 --> 00:23:17,440 That's partially what they do, Mr. Bafford. But one of the unique things that Genscape 196 00:23:17,440 --> 00:23:27,080 does is they actually have field-located meters that measure the magnetic fields around the 197 00:23:27,080 --> 00:23:34,880 transmission systems that are exiting each of these power plants. And so while information 198 00:23:34,880 --> 00:23:42,880 that is publicly available as to the status of the facilities, Genscape provides real-time 199 00:23:42,880 --> 00:23:48,640 information where we can get that information quicker than through ERCOT or other publicly 200 00:23:48,640 --> 00:23:57,280 available means. And in our business, since prices change every five minutes, having that 201 00:23:57,280 --> 00:23:59,960 real-time information is critically important. 202 00:23:59,960 --> 00:24:02,040 Okay. Thank you. 203 00:24:02,040 --> 00:24:03,040 You're welcome. 204 00:24:03,040 --> 00:24:06,680 All right. Do we have a motion to approve? 205 00:24:06,680 --> 00:24:07,680 So moved. 206 00:24:07,680 --> 00:24:08,680 Second. 207 00:24:08,680 --> 00:24:10,240 All in favor say aye. 208 00:24:10,240 --> 00:24:11,240 Aye. 209 00:24:11,240 --> 00:24:15,560 I'm sorry, Ed, did you have a question or you just? 210 00:24:15,560 --> 00:24:19,320 No, I was second or I was second. 211 00:24:19,320 --> 00:24:26,640 Okay. All right. So the next item is consider approval of the minutes of July 13th, 2020. 212 00:24:26,640 --> 00:24:30,640 Does anyone have any corrections or changes? 213 00:24:30,640 --> 00:24:42,200 The attachment that I received was for June 22nd. Does anybody have the minutes of July 214 00:24:42,200 --> 00:24:46,360 13th? I'm just looking at something weird. 215 00:24:46,360 --> 00:24:49,800 Huh. I thought I read July 13th. 216 00:24:49,800 --> 00:24:54,000 Yeah, but the actual attachment says June 22nd. 217 00:24:54,000 --> 00:24:55,000 Oh. 218 00:24:55,000 --> 00:24:57,000 Yeah, you're correct. 219 00:24:57,000 --> 00:25:04,400 Since I missed that one, I was curious about it. 220 00:25:04,400 --> 00:25:07,920 Looks like there may be an attachment error. So we may need to postpone that vote until 221 00:25:07,920 --> 00:25:14,280 the following meeting. I may ask the city attorney to weigh in on that since the wrong 222 00:25:14,280 --> 00:25:16,560 attachment was included in the item. 223 00:25:16,560 --> 00:25:20,520 Moved to table until the next meeting. 224 00:25:20,520 --> 00:25:21,520 Second. 225 00:25:21,520 --> 00:25:24,080 Okay. All in favor say aye. 226 00:25:24,080 --> 00:25:25,080 Aye. 227 00:25:25,080 --> 00:25:27,600 Okay. I got to leave again. 228 00:25:27,600 --> 00:25:29,680 Yes, you do. 229 00:25:29,680 --> 00:25:36,720 So Larry, I'll sign off and then ask to join and you can just let me on afterwards. How 230 00:25:36,720 --> 00:25:37,720 about that? 231 00:25:37,720 --> 00:25:38,720 Okay. 232 00:25:38,720 --> 00:25:39,720 Barbara? 233 00:25:39,720 --> 00:25:40,720 Question of Billy before he leaves. 234 00:25:40,720 --> 00:25:41,720 Yes, ma'am. 235 00:25:41,720 --> 00:25:45,720 What is a fire hydrant lateral? 236 00:25:45,720 --> 00:25:51,720 The lateral line coming from the fire hydrant. It goes laterally. It's just a term for a 237 00:25:51,720 --> 00:25:55,240 fire hydrant attack, you know, the water line attached to the fire hydrant. 238 00:25:55,240 --> 00:25:56,240 Okay. Thank you. 239 00:25:56,240 --> 00:25:59,000 Keep it. Okay. I'm out now. 240 00:25:59,000 --> 00:26:00,000 Bye. 241 00:26:00,000 --> 00:26:08,160 All right. Who's presenting this one, Mario? 242 00:26:08,160 --> 00:26:13,800 That's a good question. I believe we've got Trevor Cain on the line along with Becky DeVine. 243 00:26:13,800 --> 00:26:18,360 So I'm going to reach out to them. 244 00:26:18,360 --> 00:26:23,280 Yeah, I'm here. This is Trevor Cain. Can you hear me? 245 00:26:23,280 --> 00:26:24,280 Yes. 246 00:26:24,280 --> 00:26:29,560 You may need to call them the caption, Susan. 247 00:26:29,560 --> 00:26:33,200 I'm sorry. Oh, you want me to read the caption? 248 00:26:33,200 --> 00:26:34,200 Yes, ma'am. 249 00:26:34,200 --> 00:26:38,440 Consider recommending the adoption of an ordinance for the city of Denton, a Texas home rule 250 00:26:38,440 --> 00:26:44,840 municipal corporation, authorizing the city manager to execute a contract with Jagle Public 251 00:26:44,840 --> 00:26:49,760 Company for the construction of the McKinney Street/Mayhill intersection project for the 252 00:26:49,760 --> 00:26:54,440 city of Denton, providing the expenditure of funds, therefore providing an effective 253 00:26:54,440 --> 00:27:03,360 date award to the company and not to exceed $4,391,631.04. 254 00:27:03,360 --> 00:27:10,320 Susan, before we get started, Trevor, is someone supposed to be bringing the presentation up 255 00:27:10,320 --> 00:27:15,960 here on site or do you have the controls remotely? 256 00:27:15,960 --> 00:27:20,960 I do not. I was told just to call in. 257 00:27:20,960 --> 00:27:29,640 Okay. All right. Can we take just a five minute break so we can kind of get our act together 258 00:27:29,640 --> 00:27:41,040 here on site, if that's okay? Could we do that just for a few moments? 259 00:27:41,040 --> 00:27:51,880 Okay. We're back from our five minute break and we're going on to the item for the McKinney 260 00:27:51,880 --> 00:27:56,440 Street/Mayhill intersection project. Go ahead, Trevor. 261 00:27:56,440 --> 00:28:02,360 All right. Good morning. I'm sorry for the mix-up here, but we'll make it work. So y'all 262 00:28:02,360 --> 00:28:08,360 should be looking at the title slide, the McKinney/Mayhill intersection improvement. 263 00:28:08,360 --> 00:28:15,680 We can go ahead and go to the second slide. It shows the project overview. This project 264 00:28:15,680 --> 00:28:22,760 is the actual McKinney Street/Mayhill intersection. It includes traffic control, paving, drainage, 265 00:28:22,760 --> 00:28:27,700 sidewalks, street lights, traffic signals, pavement markings, and water and wastewater 266 00:28:27,700 --> 00:28:34,520 improvements. In essence, it's just the actual intersection and about 300 or 600 feet each 267 00:28:34,520 --> 00:28:41,400 way. It ties in in the middle of the current McKinney Street widening phase 2 project that's 268 00:28:41,400 --> 00:28:49,680 currently underway. We can move to the next slide. These are the bids that we received. 269 00:28:49,680 --> 00:28:57,560 We actually got three on this project. To the far left you'll see Hewitt dollars, OPC. 270 00:28:57,560 --> 00:29:02,320 Jago Public Company was the low bidder. They actually came in a little bit lower than what 271 00:29:02,320 --> 00:29:09,280 we were looking at, but pretty much right on budget what we were looking at. We can 272 00:29:09,280 --> 00:29:15,280 move to the next slide. This is our construction schedule. We go to council tomorrow pending 273 00:29:15,280 --> 00:29:23,160 a decision here. Notice to proceed, we're looking at middle of August and it's a one 274 00:29:23,160 --> 00:29:31,260 year contract. So we're looking at August 18, 2021 to be completed with this project. 275 00:29:31,260 --> 00:29:35,560 The next slide is just the recommendation. We recommend adoption of an ordinance accepting 276 00:29:35,560 --> 00:29:39,680 the competitive low bid that award a public works contract for construction on McKinney 277 00:29:39,680 --> 00:29:51,300 Street/Mayhill intersection project to Jago in the amount of $4,108,575 plus a contingency 278 00:29:51,300 --> 00:30:06,880 in the amount of $209,125.29. For the total not to exceed amount of $391,631.04. The next 279 00:30:06,880 --> 00:30:13,280 slide is just the question slide and that's the end of the presentation. I can take any 280 00:30:13,280 --> 00:30:22,040 questions that anybody has. Barbara, go ahead. Yes. Give me an example of a contingency at 281 00:30:22,040 --> 00:30:28,600 the city's discretion. What would that be like? So this 5% is something we're starting 282 00:30:28,600 --> 00:30:36,600 to add to contract. It's really just a mechanism for us to do if there's a quantity adjustments 283 00:30:36,600 --> 00:30:44,880 or change orders that fall underneath so that we don't have to go back to count, these will 284 00:30:44,880 --> 00:30:55,240 be things, you know, some items to that nature. Okay. Thanks, Matt. Yeah, I have a question. 285 00:30:55,240 --> 00:31:03,880 On the agenda information sheet, it says it makes reference to 600 liner feet. What is 286 00:31:03,880 --> 00:31:15,360 a liner foot? That's probably a typo. It should be linear feet. I would suggest when we deal 287 00:31:15,360 --> 00:31:20,240 with something that involves this much money, we have somebody proofread these dimensions 288 00:31:20,240 --> 00:31:27,140 because I can guess what it means and usually come pretty close, but it should be very clear. 289 00:31:27,140 --> 00:31:35,440 Another thing, another question. You mentioned 600 linear feet. Is that 600 feet west of 290 00:31:35,440 --> 00:31:42,040 Mayhill and 600 feet east of Mayhill? Is that what that means? Yes, sir. 600 linear feet 291 00:31:42,040 --> 00:31:52,480 east and west of the intersection. Okay. Thank you. Yes, sir. Other questions? Do we have 292 00:31:52,480 --> 00:32:06,480 a motion to approve? I move, we approve. Second. Okay. All in favor say aye. Aye. All right. 293 00:32:06,480 --> 00:32:12,380 Management reports. Yes, Madam Chair, members of the board, good morning. You have a number 294 00:32:12,380 --> 00:32:17,680 of attachments in the management report. You've got that. Do you want to wait for Billy? Oh, 295 00:32:17,680 --> 00:32:28,080 I forgot. Good point, Larry. Yes, Barbara? Charlie asked the question about all the verbiage 296 00:32:28,080 --> 00:32:35,960 in the agenda and to answer your question, yes, it has been since I was on here another 297 00:32:35,960 --> 00:32:43,760 time. There's verbiage at the beginning of everyone and Mario maybe cannot tell us why, 298 00:32:43,760 --> 00:32:48,180 but they consider recommending the adoption of the ordinance, home rule, municipal, blah, 299 00:32:48,180 --> 00:32:58,720 blah, blah. Why is that at the beginning of every agenda item? It did not feel like that. 300 00:32:58,720 --> 00:33:07,320 I'm not following your question, Barbara. Okay. At each, on the agenda, each one starts 301 00:33:07,320 --> 00:33:11,520 off with consider recommending the adoption of the ordinance of the city of Denton at 302 00:33:11,520 --> 00:33:17,160 Texas home rule municipal corporation or raising the city manager or his designated to execute 303 00:33:17,160 --> 00:33:25,520 the contract with. And that that verbiage is at the beginning of every item. And what 304 00:33:25,520 --> 00:33:36,160 is the reason for that? Larry? I can jump in. So, PUB is just making 305 00:33:36,160 --> 00:33:42,480 a recommendation and it's to comply with the open meetings act about what the PUB is doing. 306 00:33:42,480 --> 00:33:48,080 So you're considering making a recommendation for council to take an action. We've added 307 00:33:48,080 --> 00:33:54,000 city of Denton, Texas home rule municipal corporation. That's the official legal description 308 00:33:54,000 --> 00:34:01,000 of the city. And that's why we've done that. The charter is strange in that Texas in that 309 00:34:01,000 --> 00:34:05,280 Denton is just known as the city of Denton. It's not known as the city of Denton, Texas. 310 00:34:05,280 --> 00:34:11,460 And so that's why we go ahead and add all that. Could that be added at the beginning 311 00:34:11,460 --> 00:34:20,320 before before it just said the following items are considered recommending instead of each 312 00:34:20,320 --> 00:34:26,000 time, because every time, you know, you have to quickly sift through that because oh, yeah, 313 00:34:26,000 --> 00:34:31,120 they printed that again. Could you just put that once at the beginning of the agenda to 314 00:34:31,120 --> 00:34:37,880 all items that it applied to and not have to constantly be skipping over that because 315 00:34:37,880 --> 00:34:43,760 you've already read it on the first, second, third and fourth items? 316 00:34:43,760 --> 00:34:47,880 We can look at that. The bigger issue is one of complying with the Texas Open Meetings 317 00:34:47,880 --> 00:34:54,800 Act. One item, one action. And that may look like you're taking like with consent. We're 318 00:34:54,800 --> 00:35:01,080 able to do that because we're stating on consent. It's all being acted on. We can look at it 319 00:35:01,080 --> 00:35:06,280 I'll be honest with you. It's always been done that way. And no, we're the first part. 320 00:35:06,280 --> 00:35:10,020 Well, it's always been done that way since I've been here. And so there may have been 321 00:35:10,020 --> 00:35:15,840 another way we can certainly look at that. Well, before you were here, it did not. It 322 00:35:15,840 --> 00:35:21,400 was not done like that. Oh, just saying. Well, I can give you a little brief history. 323 00:35:21,400 --> 00:35:28,120 There have been council members since I have been here that have wanted to have great detail 324 00:35:28,120 --> 00:35:36,080 put in the captions that is really way beyond what the Open Meetings Act requires. But that's 325 00:35:36,080 --> 00:35:41,280 the direction they've asked us to go. And we've accommodated that. 326 00:35:41,280 --> 00:35:49,800 Understand. All right. Management reports, Murray. All right, I'll start over. Madam 327 00:35:49,800 --> 00:35:54,880 chair, members of the board. Good morning. You do have a number of items listed and in 328 00:35:54,880 --> 00:36:01,000 this month, or excuse me, this meetings report, we've got the energy center informal staff 329 00:36:01,000 --> 00:36:05,560 report and dashboard. I know the board has requested that on a number of occasions. And 330 00:36:05,560 --> 00:36:11,560 this is the latest version of that. And we've got staff from DME that can respond to those 331 00:36:11,560 --> 00:36:17,720 questions along with finance if you have any. And then we've got the identity theft prevention 332 00:36:17,720 --> 00:36:25,000 program during the emergency declaration. Got information on that. Krista Foster should 333 00:36:25,000 --> 00:36:30,920 be on the line to be able to answer any questions that you may have. And then the environmental 334 00:36:30,920 --> 00:36:34,960 preferred procurement request. That was a request that had been made previously, I believe, 335 00:36:34,960 --> 00:36:40,080 by Mr. Soph. And we're providing you all what we've done so far. I know that our staff is 336 00:36:40,080 --> 00:36:47,720 looking over the next coming months to be able to add additional components to the environmental 337 00:36:47,720 --> 00:36:53,080 preferred procurement policy. So that will be coming forward to the committee on the 338 00:36:53,080 --> 00:36:58,400 environment here in the near future and then ultimately adoption by city council. As far 339 00:36:58,400 --> 00:37:06,400 as future agenda items, you have those listed there. And then as far as today, we would 340 00:37:06,400 --> 00:37:12,520 have been covering items regarding the budget on the utilities. And I believe we are covering 341 00:37:12,520 --> 00:37:19,600 a few. But the majority of those would be covered next Tuesday, excuse me, next Monday 342 00:37:19,600 --> 00:37:24,920 on special called meeting. And then lastly, it's just any new business items that we have 343 00:37:24,920 --> 00:37:33,160 on your report. Any questions that you may have on any of these reports that we can get 344 00:37:33,160 --> 00:37:40,600 staff on the line for? Yes, I have one. Ed's hands up, too. So we'll go to Ed first, then 345 00:37:40,600 --> 00:37:52,000 you, then Gerald. I had a question regarding the DEC report. And that question is, in keeping 346 00:37:52,000 --> 00:38:02,440 with Denton's sustainability goals, is there a policy or initiative in place to offset 347 00:38:02,440 --> 00:38:15,880 the DEC's greenhouse gas emissions? Terry Nolte will be able to answer that. And I believe 348 00:38:15,880 --> 00:38:25,840 Ken Banks is on the line as well. Good morning. Terry Nolte, Assistant General Manager. There 349 00:38:25,840 --> 00:38:35,240 is no current policy at DME with regard to offsetting those carbon emissions. I think 350 00:38:35,240 --> 00:38:45,480 as the board knows, as 100% renewable supplied utility, the metric that we use for determining 351 00:38:45,480 --> 00:38:53,520 that 100% renewable is based on the renewable energy credits that we have associated with 352 00:38:53,520 --> 00:39:01,120 contracted renewable energy resources, those equal the total load that served over the 353 00:39:01,120 --> 00:39:09,200 year. And therefore, we net to kind of a zero sum game on carbon to serve the load. However, 354 00:39:09,200 --> 00:39:17,280 we do not have any active program to account for those carbon emissions that take place 355 00:39:17,280 --> 00:39:23,920 from the DEC. We are looking at a number of technologies. Recently, there's been a lot 356 00:39:23,920 --> 00:39:33,920 of work on introducing hydrogen into natural gas pipelines as a measure or a means to offset 357 00:39:33,920 --> 00:39:39,440 some of those carbon emissions. If you combust hydrogen, there are no carbon emissions from 358 00:39:39,440 --> 00:39:48,740 hydrogen. However, that is in its infancy across the United States. Interestingly, the 359 00:39:48,740 --> 00:40:02,000 Wurzilla engines at the DEC do have the capability of processing natural gas combined with hydrogen. 360 00:40:02,000 --> 00:40:08,640 Is there any – do you think, Terry, there's any interest between, say, DME working with 361 00:40:08,640 --> 00:40:18,600 the sustainability folks in working out some sort of means of offsets until there is a 362 00:40:18,600 --> 00:40:22,280 technological advance where the emissions are reduced? 363 00:40:22,280 --> 00:40:29,920 We'd be glad to work with sustainability on what the options are and determine whether 364 00:40:29,920 --> 00:40:37,080 that's something that the PUB or the council would be willing to pursue and what the cost 365 00:40:37,080 --> 00:40:38,920 would be. 366 00:40:38,920 --> 00:40:46,800 I hope you can go forward with that and keep us apprised of any progress. 367 00:40:46,800 --> 00:40:51,000 All right. Russ, you had a question? 368 00:40:51,000 --> 00:41:00,040 Yes, I do. On the DEC report, the line item that says insurance, we're spending roughly 369 00:41:00,040 --> 00:41:06,400 twice the amount budgeted for insurance. And I know part of that – that's a $580,000 370 00:41:06,400 --> 00:41:13,520 increase, I believe. And part of that is because of the outage insurance we agreed to purchase. 371 00:41:13,520 --> 00:41:21,240 But I don't remember how much the cost was for that outage insurance. 372 00:41:21,240 --> 00:41:27,400 My memory – I don't have the exact number – somewhere around $280,000 was the bill 373 00:41:27,400 --> 00:41:33,300 for that. We did not budget that as an insurance item. We actually budgeted that as a – one 374 00:41:33,300 --> 00:41:41,220 of the costs of power supply in the Energy Management Office. The balance of the increase 375 00:41:41,220 --> 00:41:50,000 is due to a very large premium increase in our property and business interruption insurance 376 00:41:50,000 --> 00:41:58,200 that took place this year. We renew those policies each year. It's premised upon kind 377 00:41:58,200 --> 00:42:06,040 of the market that's being offered in – for that particular type of service. 378 00:42:06,040 --> 00:42:12,280 And as I know, Bafford, you've got a background in power generation. So, you know, each year 379 00:42:12,280 --> 00:42:20,100 the carrier comes out, reviews metrics, performance, and then assesses its reinsurance options 380 00:42:20,100 --> 00:42:26,080 in the marketplace. And for some reason, this year, across the industry, we've seen about 381 00:42:26,080 --> 00:42:36,120 a 30 to 40 percent increase in business interruption and property and casualty insurance for these 382 00:42:36,120 --> 00:42:38,040 types of generating facilities. 383 00:42:38,040 --> 00:42:46,400 Yeah, I understand that. Given how really few hours we operate those engines compared 384 00:42:46,400 --> 00:42:53,640 to the total hours in a year, our interruption, I would think, wouldn't be all that much. 385 00:42:53,640 --> 00:42:59,240 And it's a new facility. So my only suggestion is it might be time to think about shopping 386 00:42:59,240 --> 00:43:07,280 for some insurance. You ever shop for different carriers? 387 00:43:07,280 --> 00:43:14,160 In fact, this year we just switched brokers, and that happened during a transition period 388 00:43:14,160 --> 00:43:20,600 where we – where the risk department was transitioning from one manager to another. 389 00:43:20,600 --> 00:43:28,940 And the prior insurance carrier provided us a quote. We are currently shopping that property 390 00:43:28,940 --> 00:43:34,920 and casualty and business interruption insurance. And to the extent we can find a provider that 391 00:43:34,920 --> 00:43:41,640 would provide us with comparable coverage at a lower rate, under the current trend – the 392 00:43:41,640 --> 00:43:47,560 current policy, we can seek, and they will reimburse us for the unused portion. So we 393 00:43:47,560 --> 00:43:51,840 are actively trying to find a way to lower that cost. 394 00:43:51,840 --> 00:43:56,040 Yeah, that's good. That's all I had on that one. 395 00:43:56,040 --> 00:44:04,880 Charlie, you had your hand up earlier, right? You're on mute. 396 00:44:04,880 --> 00:44:14,280 Sorry. Back on the red flags rule briefing, thank you for that. I just wanted to make 397 00:44:14,280 --> 00:44:20,840 one comment on that. I think our City customer service does an excellent job of balancing 398 00:44:20,840 --> 00:44:28,200 preventing identity theft and giving customer service to people. I really am grateful for 399 00:44:28,200 --> 00:44:35,080 the good job they do. I just – as we implement this formally rather than informally, I think 400 00:44:35,080 --> 00:44:41,360 it's important to remember where identity theft is a risk, perhaps new accounts, and 401 00:44:41,360 --> 00:44:46,480 where it's probably not a risk, and that we don't add a lot of red tape to our staff 402 00:44:46,480 --> 00:44:52,960 and to our customers. I think that could be a bad thing as we implement a formal policy 403 00:44:52,960 --> 00:45:01,000 rather than just good common sense. Thanks. Billy, did you have your hand up? No. Ed, 404 00:45:01,000 --> 00:45:09,040 did you? Yep, go ahead. I just wanted to request, if it's handy, 405 00:45:09,040 --> 00:45:23,760 I would like to receive a DEC emissions report that the cumulative amounts of all emissions 406 00:45:23,760 --> 00:45:33,760 since the plant began operation, would that be possible to receive? Like a year to date 407 00:45:33,760 --> 00:45:40,720 from the initial operation of the plant when it was first fired up? Absolutely, we can 408 00:45:40,720 --> 00:45:43,200 certainly do that. Mario, this is Chris Ludrick. I think I can 409 00:45:43,200 --> 00:45:47,680 answer that question. Please do. 410 00:45:47,680 --> 00:45:55,080 I didn't know if you could hear me or not. Yes, Mr. So, on our webpage, we have summaries 411 00:45:55,080 --> 00:45:58,600 from 2018 and 2019. Okay. 412 00:45:58,600 --> 00:46:06,320 Those emissions on the tonnage are year to date. So, the 2019 annual summary will have 413 00:46:06,320 --> 00:46:09,680 those figures you're looking for, and if you would like, we could add them together and 414 00:46:09,680 --> 00:46:14,120 send them to you, but those figures are available on the webpage. 415 00:46:14,120 --> 00:46:17,680 Okay, thank you, Chris. You're welcome. 416 00:46:17,680 --> 00:46:23,720 I have a question about the procurement program, too. Is this the right time to ask? 417 00:46:23,720 --> 00:46:30,680 It's under your environmental preferred? Yes, absolutely. Go ahead. 418 00:46:30,680 --> 00:46:40,840 Okay. Let me see here. I just want, the first question is, is Staples the sole environmentally 419 00:46:40,840 --> 00:46:51,080 conscious vendor that the city uses for all its eco products? 420 00:46:51,080 --> 00:46:57,120 This is Cassie Ogden, well, previous director of procurement and compliance. Yes, the Staples 421 00:46:57,120 --> 00:47:04,800 is our sole provider of office supplies, and so they do report on those items. We can request 422 00:47:04,800 --> 00:47:11,480 the report as often as we would like, but we've opted to do the report annually. 423 00:47:11,480 --> 00:47:22,080 Thank you. Does the city ever issue purchasing requests or send bids out for environmentally 424 00:47:22,080 --> 00:47:29,160 preferred products, like very often the DME does for when it has construction work done? 425 00:47:29,160 --> 00:47:35,880 In other words, have you actually, or has the city explored other venues for purchasing 426 00:47:35,880 --> 00:47:43,640 these products, especially with businesses and distributors who deal exclusively in that 427 00:47:43,640 --> 00:47:50,960 sort of product? Not to my knowledge, like I said in the memo, 428 00:47:50,960 --> 00:47:57,440 our purchasing records were very limited prior to 2017. We changed the requirements in 2017 429 00:47:57,440 --> 00:48:01,720 for the records that we were required to keep and how they were organized. So those were 430 00:48:01,720 --> 00:48:07,380 the only items that I was able to find. Catherine Barnett might be able to give you some more 431 00:48:07,380 --> 00:48:15,960 context to that, but we are working to draft a policy, should be coming to you in the fall, 432 00:48:15,960 --> 00:48:21,800 that will give us more parameters when we do go out to bid on items that we can include 433 00:48:21,800 --> 00:48:26,680 and kind of give us some targets to hit for those recyclable items. 434 00:48:26,680 --> 00:48:32,440 Okay. The reason I ask, and I don't know if there's anybody from sustainability on 435 00:48:32,440 --> 00:48:42,340 the line, but with a program that was instituted in 2007, the results, according to the pie 436 00:48:42,340 --> 00:48:50,640 charts that are included in the backup material, are not very encouraging in terms of the percentages 437 00:48:50,640 --> 00:48:59,600 of how much of the product that are supplies that the city uses, furniture, et cetera, 438 00:48:59,600 --> 00:49:06,680 the small percentage of that, which is eco-friendly. And you can see that in the pie chart that 439 00:49:06,680 --> 00:49:11,320 provided. So I'm wondering if part of the problem for 440 00:49:11,320 --> 00:49:18,360 what is clearly perhaps a lack of progress over these 13 years might be the fact that 441 00:49:18,360 --> 00:49:24,360 the city has been relying on one vendor for all of this and the limitations that could 442 00:49:24,360 --> 00:49:32,120 be imposed upon possible purchases by the fact that the city is only using one vendor. 443 00:49:32,120 --> 00:49:37,720 We have Catherine Barnett, she's with sustainability on the line. 444 00:49:37,720 --> 00:49:45,840 Hi Ed, this is Catherine, sustainability manager. Like Cassie said, they were only able to go 445 00:49:45,840 --> 00:49:52,880 back and confirm some of the records to 2017. Staples is just our vendor for office supplies, 446 00:49:52,880 --> 00:50:00,640 so that's just going to be our typical office used paper, those type of items. Now we've 447 00:50:00,640 --> 00:50:06,880 done green cement, you probably remember that, several years ago we had that whenever we 448 00:50:06,880 --> 00:50:15,520 were trying to use some of the kilns that had already made the environmental improvements. 449 00:50:15,520 --> 00:50:21,520 There's an air quality preference that's in some of our bid specs, and then of course 450 00:50:21,520 --> 00:50:27,560 we have the local preference. So there have been a few bid items, but Staples is just 451 00:50:27,560 --> 00:50:37,200 a small part of what we do. We've done janitorial supplies that were environmentally preferable. 452 00:50:37,200 --> 00:50:44,880 And this is, unfortunately we're relying on my memory for some of this, but office supplies 453 00:50:44,880 --> 00:50:50,240 definitely aren't the only thing that we've done, but there there is room to embed more 454 00:50:50,240 --> 00:50:55,920 in our policies. Yeah, and as someone mentioned, a forthcoming 455 00:50:55,920 --> 00:51:02,600 document that's going to flesh out what the policies, what the city's policies are on 456 00:51:02,600 --> 00:51:07,280 a sustainable procurement program. Is that true? Because as it is now, there's really 457 00:51:07,280 --> 00:51:13,280 nothing solely dealing with it. It's dealt very, very briefly in the city procurement 458 00:51:13,280 --> 00:51:22,800 manual on page 61, but there really is no standout document that really outlines everything 459 00:51:22,800 --> 00:51:28,040 from plastics to air quality, which you know what I'm talking about, and a comprehensive 460 00:51:28,040 --> 00:51:35,320 document that puts goals and accomplishments in place. 461 00:51:35,320 --> 00:51:39,880 Yeah, and I can elaborate, that is going to be bringing, being brought forward to the 462 00:51:39,880 --> 00:51:45,000 Committee on the Environment, that'll go along with the, this is the Simple Sustainability 463 00:51:45,000 --> 00:51:51,040 Strategy Plan. Along the way, the city has, through city council, has embraced a number 464 00:51:51,040 --> 00:51:57,480 of new policies like the integrated pest management program. That is a program that is a lot further 465 00:51:57,480 --> 00:52:03,000 along than what it was before as far as the use of sustainable products out in our fields 466 00:52:03,000 --> 00:52:10,240 that when we maintain our ball fields, medians, et cetera, and also the utilization of pesticides 467 00:52:10,240 --> 00:52:15,120 when they're used inside city buildings, et cetera. So the city has come a long way. I 468 00:52:15,120 --> 00:52:20,080 mean, there is a lot to be done. And quite honestly, you never really arrive because 469 00:52:20,080 --> 00:52:24,320 the marketplace dictates a lot of these things when it comes to fixtures, when it comes to 470 00:52:24,320 --> 00:52:30,300 plumbing fixtures, and as a city adopts energy codes, those things have just become much 471 00:52:30,300 --> 00:52:37,520 more ubiquitous across a lot of different aspects of the, not only the community organization 472 00:52:37,520 --> 00:52:44,520 itself, but across the community as development occurs. So there's more to come. And so certainly 473 00:52:44,520 --> 00:52:49,720 we as staff recognize that it's, we've only scratched the surface when it comes to this. 474 00:52:49,720 --> 00:52:55,640 And so we're also taking a concerted effort to up our game when it comes to these types 475 00:52:55,640 --> 00:53:01,960 of products and practices. - Thank you. I appreciate that very much. 476 00:53:01,960 --> 00:53:07,280 - Any other questions? - Yes, I have one. 477 00:53:07,280 --> 00:53:11,800 - Yes, go ahead, Russ. - Item number five, action items. There's 478 00:53:11,800 --> 00:53:19,240 an item on there says that today, July 27th, we'd receive some kind of a presentation about 479 00:53:19,240 --> 00:53:29,960 why our capital budget items that we've identified and funded and budgeted for cannot get done. 480 00:53:29,960 --> 00:53:38,640 And that was a question I had pre-COVID days. This predates the COVID thing that overwhelmed 481 00:53:38,640 --> 00:53:42,400 everybody. So I'd just like to follow up on that. 482 00:53:42,400 --> 00:53:46,160 - Are you talking about item number four on the capital utilities? 483 00:53:46,160 --> 00:53:52,800 - Yes. Let's see. Yeah, the one that's got my name by it. 484 00:53:52,800 --> 00:53:58,320 - Sure. That would have been presented today as part of your budget overview. However, 485 00:53:58,320 --> 00:54:03,420 it's not scheduled today. It'll be scheduled next Monday. You all have a special call meeting 486 00:54:03,420 --> 00:54:09,160 next Monday to go over all the utility budgets. So with that will be a presentation that gives 487 00:54:09,160 --> 00:54:14,660 you an overview of the progress on our capital improvement plan for the utilities. 488 00:54:14,660 --> 00:54:17,080 - Thank you. - You heard your hand up. 489 00:54:17,080 --> 00:54:24,680 - I did. Item one on the new business action items. About four and a half months ago, I 490 00:54:24,680 --> 00:54:30,940 requested a briefing on a lawsuit lost by the city of Denton involving the determination 491 00:54:30,940 --> 00:54:37,840 of two DME employees. Nothing's happened since I requested the briefing. Barbara kindly brought 492 00:54:37,840 --> 00:54:44,040 it up last meeting and still nothing has happened. If staff thinks this request is outside of 493 00:54:44,040 --> 00:54:49,880 the PUB's purview, or if it's best handled in a closed meeting, that's fine. Just say 494 00:54:49,880 --> 00:54:56,280 so. However, we're dealing with an enormous lawsuit with implications both to DME personnel 495 00:54:56,280 --> 00:55:01,660 and to the budget. So I think it's both relevant and time sensitive. And I would ask staff 496 00:55:01,660 --> 00:55:10,680 to respond at the next meeting. - Okay. Larry, do you want to say anything? 497 00:55:10,680 --> 00:55:15,560 - At this point, we can probably put something together. 498 00:55:15,560 --> 00:55:22,560 - We'll put something together. - Thank you. Any other questions? All right. 499 00:55:22,560 --> 00:55:28,000 On to concluding items. Does a board member wish to have anything added to a future agenda 500 00:55:28,000 --> 00:55:36,440 or have comments for staff? - What Charlie's comments and questions just 501 00:55:36,440 --> 00:55:44,880 work as far as that goes. The DME employee situation is starting to go in that category 502 00:55:44,880 --> 00:55:50,680 better than where we were. - Yeah. I would like to congratulate Mario 503 00:55:50,680 --> 00:55:55,520 and thank you for his service to Denton. You'll be missed. 504 00:55:55,520 --> 00:55:57,720 - Thank you. - Their gain is our loss. 505 00:55:57,720 --> 00:56:01,080 - Well, I appreciated this. It's going to be my last PUB meeting, even though you do 506 00:56:01,080 --> 00:56:07,360 have a special call one, but we'll miss staff and certainly the board and appreciate all 507 00:56:07,360 --> 00:56:12,440 your, certainly your patience today and past meetings when we've had issues brought before, 508 00:56:12,440 --> 00:56:16,480 you appreciate your professionalism and just your ability to support city staff and city 509 00:56:16,480 --> 00:56:23,660 operations. With that being said, at the next meeting, Tony Puente will be the staff liaison 510 00:56:23,660 --> 00:56:29,920 between the city and the public utilities board. You know Tony well, so it's a familiar face. 511 00:56:29,920 --> 00:56:34,160 And so I know he'll do a great job. - Best wishes to you. 512 00:56:34,160 --> 00:56:36,920 - Thank you very much. - Yes. Mario, for those of us who live in 513 00:56:36,920 --> 00:56:42,980 the dark sometimes, where are you going? - Well, I will be, I have been appointed the 514 00:56:42,980 --> 00:56:48,240 city manager of Nacogdoches, Texas, which is in East Texas. I went to college and I'm 515 00:56:48,240 --> 00:56:54,200 from the Dallas-Fort Worth area, but I went to undergrad as Stephen F. Austin. And so 516 00:56:54,200 --> 00:56:57,960 I'll be being their next city manager starting August 10th. 517 00:56:57,960 --> 00:57:00,320 - Great, congratulations. - Appreciate it. 518 00:57:00,320 --> 00:57:06,360 - So you're going to be lumberjack, right? - Go Jacks, go Jacks. Yes, ma'am. 519 00:57:06,360 --> 00:57:09,120 - Good luck. - Thank you. 520 00:57:09,120 --> 00:57:13,160 - All right, so now we're going into work session. We're going to receive a report, 521 00:57:13,160 --> 00:57:19,920 hold a discussion and give direction regarding the electric fiscal year 2021 proposed budget 522 00:57:19,920 --> 00:57:24,400 capital improvement program and the five-year financial summary. 523 00:57:24,400 --> 00:57:32,680 - Good morning, PB members, chairs, Nick Benson, assistant director of finance. Can you hear 524 00:57:32,680 --> 00:57:34,160 me okay? - Yes. 525 00:57:34,160 --> 00:57:39,880 - Perfect. Let me get the presentation pulled up and then I'll do a quick introduction to 526 00:57:39,880 --> 00:57:44,240 Tony who will take over the operational discussion of the presentation. But to facilitate the 527 00:57:44,240 --> 00:57:47,720 online meeting, we've actually broken the discussion up into two parts. The first part 528 00:57:47,720 --> 00:57:52,400 of the presentation will be an operating discussion to cover really the goals and accomplishments 529 00:57:52,400 --> 00:57:56,920 of the electric department. About halfway through, there will be a slide to allow for 530 00:57:56,920 --> 00:58:02,120 questions. You can ask Tony any questions that you may have regarding the operations. 531 00:58:02,120 --> 00:58:05,840 After it gets done, I'll come back up and present the financial portion of the presentation, 532 00:58:05,840 --> 00:58:10,560 and then of course we'll finish out with questions regarding the financial section. A couple 533 00:58:10,560 --> 00:58:14,120 of things. When you read to the financial presentation today, this is an abbreviated 534 00:58:14,120 --> 00:58:18,200 presentation of the budget. Our full intent is to circle back to the public utility board 535 00:58:18,200 --> 00:58:22,520 this winter in November and December to have a detailed budget discussion with both the 536 00:58:22,520 --> 00:58:27,800 public utility board and city council. This will allow us time to have those high revenue 537 00:58:27,800 --> 00:58:31,680 months for the utilities of July and August. So actually this is July, but we'll also have 538 00:58:31,680 --> 00:58:37,640 August also and fully understand the COVID impact to the city utilities to further those 539 00:58:37,640 --> 00:58:43,760 discussions with both the PB and city council. With that, I'll turn it over to Tony and he 540 00:58:43,760 --> 00:59:02,280 will take the presentation over. Oh, let me go back. Sorry about that. I just realized 541 00:59:02,280 --> 00:59:05,320 you couldn't see me. So now you can't see me. Hang on a second. I'll turn it over to 542 00:59:05,320 --> 00:59:31,240 Tony. We can't hear you, Tony. Here we go. So Madam Chair and members of the PB, some 543 00:59:31,240 --> 00:59:35,480 of the changes in the organization, I recently assumed the position of executive manager 544 00:59:35,480 --> 00:59:41,800 of utilities. And so I'll be providing management oversight of all the utilities as well as 545 00:59:41,800 --> 00:59:46,920 being the liaison to the sports. I certainly look forward to that. But with those changes, 546 00:59:46,920 --> 00:59:50,560 I will continue to serve as the DME general manager. And that's the reason why I'm doing 547 00:59:50,560 --> 00:59:55,000 the presentation today. Obviously Terry Nolte is also in the room in case I get into any 548 00:59:55,000 --> 00:59:59,240 trouble, or there's any questions that you may have. So with that, I'll go ahead and 549 00:59:59,240 --> 01:00:08,920 shift over to the presentation and get the operational component going. So the first 550 01:00:08,920 --> 01:00:14,400 thing that I want to say before we get started, obviously this past year has been a challenging 551 01:00:14,400 --> 01:00:19,160 one. I certainly want to thank all our staff for all the work that they've done. Really 552 01:00:19,160 --> 01:00:24,920 unprecedented times, as you know, across not just the utilities, but our state or city 553 01:00:24,920 --> 01:00:29,680 and certainly the country. But I do want to thank them for all the work they've done. 554 01:00:29,680 --> 01:00:34,280 I will report to you that our staff is in good shape. We've been able to continue to 555 01:00:34,280 --> 01:00:40,880 keep the lights on and serve the community. And as well, through this process, we also 556 01:00:40,880 --> 01:00:45,800 had the opportunity, if you want to call it that, to respond to a F-1 tornado that tore 557 01:00:45,800 --> 01:00:51,440 through downtown Bowie. And so we provided mutual aid during that time. And so I really 558 01:00:51,440 --> 01:00:57,320 just want to thank Brad Watts and some of our other line operations staff that responded 559 01:00:57,320 --> 01:01:02,560 to that. And just let me say that there was no shortage of volunteers. The staff has been 560 01:01:02,560 --> 01:01:08,080 very responsive to those situations where we respond to mutual aid. And so I just report 561 01:01:08,080 --> 01:01:12,480 to you that we continue to do that. And we're happy to help out our neighbors through that, 562 01:01:12,480 --> 01:01:16,320 because again, we never know when we may need that same kind of help. So I just want to 563 01:01:16,320 --> 01:01:20,160 thank them for all the work they've done over the last year. So I want to go through just 564 01:01:20,160 --> 01:01:24,000 a couple of these accomplishments and goals. Certainly, I'm not going to cover every single 565 01:01:24,000 --> 01:01:29,960 one of these. But the one that I wanted to point out is number two that you see on there. 566 01:01:29,960 --> 01:01:34,720 And we did a lot of work over the last year with the Hunter and Coal Ranch developments. 567 01:01:34,720 --> 01:01:42,040 I'll report to you that every location where we could serve that development, if it was 568 01:01:42,040 --> 01:01:52,960 monthly certified, we were... What's that? The presentation isn't up on the screen. All 569 01:01:52,960 --> 01:02:11,880 right. Sorry about that. It's okay. Rookie mistake. Sorry about that. So as I said, with 570 01:02:11,880 --> 01:02:17,700 the Hunter and Coal Ranch, every area that was available for us to serve, we did get 571 01:02:17,700 --> 01:02:22,720 a commitment, a contract commitment for those developers to serve that area. We estimate 572 01:02:22,720 --> 01:02:28,080 that's going to be about four to 6,000 new customers over that build out period. Now, 573 01:02:28,080 --> 01:02:34,200 that is a 30-year build out period. But through those negotiations, we were also able to... 574 01:02:34,200 --> 01:02:42,360 Over 10 acres that were donated to the city that we are working through the title transfer. 575 01:02:42,360 --> 01:02:47,920 That property will be utilized to site the Underwood substation, which will primarily 576 01:02:47,920 --> 01:02:53,960 serve that development, but certainly that area as we continue to expand that southwest 577 01:02:53,960 --> 01:03:01,920 sector of the city. The next item that I wanted to talk about is there on number three. And 578 01:03:01,920 --> 01:03:05,600 I'll talk a little bit more about this when we get into the FT accounts, but we continue 579 01:03:05,600 --> 01:03:10,400 to look at our organization. We had an external review that was done and we've been restructuring 580 01:03:10,400 --> 01:03:19,900 DME over the last year. Currently, in this phase one, we've concentrated on our engineering 581 01:03:19,900 --> 01:03:26,440 department and also our metering department. Certainly, the voluntary separation program 582 01:03:26,440 --> 01:03:33,240 has also assisted in helping us take a look at our organization and where FT's are found 583 01:03:33,240 --> 01:03:41,360 and try just to be more efficient, more conscious of our labor costs. And so that is something 584 01:03:41,360 --> 01:03:46,440 that we've done. We no longer have two separate engineering groups. We've combined those into 585 01:03:46,440 --> 01:03:50,880 a single engineering group under a single manager. And also we've made some changes 586 01:03:50,880 --> 01:03:55,760 and continue to look for some additional changes over the next year, year and a half in our 587 01:03:55,760 --> 01:04:01,800 metering shop. Currently, we provide water metering services for our water department. 588 01:04:01,800 --> 01:04:07,840 And so we're looking at potential transitions, looking at technology that could further reduce 589 01:04:07,840 --> 01:04:12,420 some of the headcount or at least transfer the headcount over to the water department. 590 01:04:12,420 --> 01:04:17,200 The last item that I'll kind of touch base with you is number seven on here is that's 591 01:04:17,200 --> 01:04:22,160 the achieving the 100% renewable power supplies. You know, we had a lot of discussions with 592 01:04:22,160 --> 01:04:27,800 the PAB and certainly with the council. Terry Nolte kind of led us through those discussions. 593 01:04:27,800 --> 01:04:35,940 But I'll report to you that based on the Denton renewable plan, resource renewable plan, we 594 01:04:35,940 --> 01:04:43,320 will be 100% renewable under contract by the end of this year. So we will, and we have 595 01:04:43,320 --> 01:04:49,320 a slide after this that will just talk a little bit more about kind of where we are as far 596 01:04:49,320 --> 01:04:56,760 as those goals. Future goals. So we want to talk a little bit about number three here. 597 01:04:56,760 --> 01:05:03,120 So we continue to look for additional opportunities for, you know, short term and long term PPAs. 598 01:05:03,120 --> 01:05:08,880 Currently have three RFPs that that are being evaluated. We anticipate bringing those back 599 01:05:08,880 --> 01:05:14,620 to the PAB and then the council sometime in August, maybe towards the end of August. Those 600 01:05:14,620 --> 01:05:22,840 include additional coastal wind, solar, and also a smaller solar with battery. We're currently, 601 01:05:22,840 --> 01:05:27,960 like I said, evaluating those and we will be bringing that back to you for consideration. 602 01:05:27,960 --> 01:05:34,680 Again, that will help us as some of our other contracts begin to roll off in 2024, that 603 01:05:34,680 --> 01:05:42,460 these will then come online so that we continue with that 100% goal in mind. And then finally, 604 01:05:42,460 --> 01:05:49,760 I'll touch base on number six. So next to our people, data is our next biggest resource. 605 01:05:49,760 --> 01:05:54,720 We continue to look at our metering data. DME spent a lot of money over the last few 606 01:05:54,720 --> 01:06:02,200 years to automate our meters. And so making sure that we have access to that interval 607 01:06:02,200 --> 01:06:10,320 data will not just help our EMO in purchasing power for our customers, but certainly be 608 01:06:10,320 --> 01:06:16,920 able to give us some additional rate opportunities to offer time of use rates and other types 609 01:06:16,920 --> 01:06:22,040 of rates to our customers, as well as giving them more access and more control to their 610 01:06:22,040 --> 01:06:27,720 consumption in their residence. And so that's certainly something that we look forward to. 611 01:06:27,720 --> 01:06:33,440 We've been working towards already, but we anticipate that going into next year we'll 612 01:06:33,440 --> 01:06:40,000 continue to make progress. So just some philosophical changes. Certainly over the last year, we've 613 01:06:40,000 --> 01:06:48,560 been focusing on reducing rate pressures. We've looked at our capital improvement program. 614 01:06:48,560 --> 01:06:54,120 As you may recall, that for the current year, we did reduce the amount of debt that we issued 615 01:06:54,120 --> 01:07:00,160 by about $10 million. That was really just taking a fresh look at the CIP program that 616 01:07:00,160 --> 01:07:07,240 was in place. We'll continue to do that in the next year. And so we anticipate that if 617 01:07:07,240 --> 01:07:12,200 there are opportunities for us to put off some things, maybe do things a little bit 618 01:07:12,200 --> 01:07:17,080 differently, reevaluate some of our projects, we'll continue to do that. One of the examples 619 01:07:17,080 --> 01:07:23,200 that I'll put out there that we've discussed is with the two GIS substations that we're 620 01:07:23,200 --> 01:07:31,120 planning, the Hickory GIS substation, the Eagle. We made a recommendation that taking 621 01:07:31,120 --> 01:07:37,440 a fresh look at the Eagle substation, we think that that substation may be somewhat premature, 622 01:07:37,440 --> 01:07:44,680 and so we anticipate about $17 million in deferred cost by not doing that substation. 623 01:07:44,680 --> 01:07:48,640 But we do anticipate a little bit of additional cost on the Hickory substations to be able 624 01:07:48,640 --> 01:07:54,320 to serve the UNT load. That's something that we continue to have conversations and anticipate 625 01:07:54,320 --> 01:08:00,040 having conversations with the University of North Texas as well. The other item on here 626 01:08:00,040 --> 01:08:05,080 is just evaluating distributed generation policies. As you know, we've come to you 627 01:08:05,080 --> 01:08:10,000 and also with the council to discuss our rooftop solar program, both on the rebate side and 628 01:08:10,000 --> 01:08:14,840 also on the utility side. We've gotten some good information. We're doing some additional 629 01:08:14,840 --> 01:08:19,520 research based on the questions that we've gotten, and we anticipate coming back to you 630 01:08:19,520 --> 01:08:26,040 probably sometime next month to continue to have those conversations on where we may go 631 01:08:26,040 --> 01:08:33,140 with those types of policies. And then finally, certainly as a result of the current pandemic, 632 01:08:33,140 --> 01:08:38,560 we've had some opportunities to look at telecommuting in our organization. And so if you walk onto 633 01:08:38,560 --> 01:08:44,080 the DME campus today, you'll find that there's a lot of buildings with not a lot of people 634 01:08:44,080 --> 01:08:48,680 in them. And so we have a lot of folks that are working from home and have been doing 635 01:08:48,680 --> 01:08:55,080 so very effectively. And so we've seen no impacts to our service level, certainly not 636 01:08:55,080 --> 01:08:59,400 as a result of that telecommuting. As a matter of fact, I think we've had a lot more productivity 637 01:08:59,400 --> 01:09:04,240 from our staff as a result of them being able to work from home. And so we'll continue to 638 01:09:04,240 --> 01:09:10,960 evaluate that and continue to look at what spaces we may have currently at DME. We certainly 639 01:09:10,960 --> 01:09:16,160 have some needs, certainly for our operational folks by way of locker rooms and restrooms 640 01:09:16,160 --> 01:09:20,520 and other adequate training areas. So we'll be looking at that over the next year, but 641 01:09:20,520 --> 01:09:26,480 certainly the pandemic is forced us to look at these sorts of things. And so it is one 642 01:09:26,480 --> 01:09:33,520 of the positive things, if you will, that's come out of the current challenges. So just 643 01:09:33,520 --> 01:09:38,840 a couple of metrics that I'll cover. This is certainly, I already spoke about the renewable 644 01:09:38,840 --> 01:09:47,800 energy and this is really how do we sustain that goal going out beyond even 2023. So as 645 01:09:47,800 --> 01:09:52,600 I mentioned earlier, we've already achieved the goal that's outlined in the Renewable 646 01:09:52,600 --> 01:10:00,000 Plan, but certainly being able to sustain that over the long haul. We do have the lawn 647 01:10:00,000 --> 01:10:05,320 draw project that has been somewhat delayed, but we anticipate that there will be back 648 01:10:05,320 --> 01:10:10,720 online and certainly they've had some challenges with getting materials from China and other 649 01:10:10,720 --> 01:10:17,640 places and so, but we anticipate that that project will be back on schedule. And then 650 01:10:17,640 --> 01:10:21,480 the other item that I'll mention, which is one that we've talked with you about is the 651 01:10:21,480 --> 01:10:28,600 Whitetail contract. That contract will expire in December of 2023 and so that is the reason 652 01:10:28,600 --> 01:10:34,680 for the current RFPs that we have, that we're currently evaluating. Our hope is to be able 653 01:10:34,680 --> 01:10:41,480 to have something in place so that when Whitetail expires, it will have a new resource in place 654 01:10:41,480 --> 01:10:51,600 to continue down the path of 100% renewable or more. And as I mentioned earlier, we did 655 01:10:51,600 --> 01:10:59,720 issue a smaller five megawatt RFP for a solar project that's combined with battery storage. 656 01:10:59,720 --> 01:11:05,440 We would anticipate that that would be located somewhere in the city. We've had positive 657 01:11:05,440 --> 01:11:09,460 conversations with the University of North Texas as a property that they may have and 658 01:11:09,460 --> 01:11:15,520 so we'll continue to evaluate that and be ready to discuss that with you in more detail 659 01:11:15,520 --> 01:11:22,280 over the next month or so. You know, certainly one of the things that we're very proud of 660 01:11:22,280 --> 01:11:28,260 is DME's reliability. As you can see here and this national average is a little dated, 661 01:11:28,260 --> 01:11:33,720 but again I think it's a good measuring stick for us. The national average is about 139 662 01:11:33,720 --> 01:11:38,360 minutes worth of outage. As you can see over the last four years, we've certainly been 663 01:11:38,360 --> 01:11:47,880 well below that. 2019, our average outage was about 39 minutes and so certainly if you 664 01:11:47,880 --> 01:11:53,560 are a DME customer, you know that there's very few times that your electricity is out 665 01:11:53,560 --> 01:11:59,400 and when it is out, we get you back up in pretty short order. So we're very proud of 666 01:11:59,400 --> 01:12:07,320 this reliability measure. It is something that we're recognized routinely for our accomplishments 667 01:12:07,320 --> 01:12:13,880 there. And then competitive rates, this is a little bit dated. As Nick mentioned, we 668 01:12:13,880 --> 01:12:19,440 will be coming back to you in November after we've closed out the fiscal year and having 669 01:12:19,440 --> 01:12:26,000 a much broader discussion with you about where we are financially. Certainly the month of 670 01:12:26,000 --> 01:12:33,480 August and September are busy months, both from a demand standpoint, but also we're hopeful 671 01:12:33,480 --> 01:12:40,400 that also for that the deck is up and running during that time period. And so we think that 672 01:12:40,400 --> 01:12:43,760 making sure that we have a closed out year to be able to have a good discussion with 673 01:12:43,760 --> 01:12:48,480 the PV and with the council about rates, but kind of based on where we are and where we've 674 01:12:48,480 --> 01:12:56,120 been, I think historically we've been about the midpoint when we compare to some of the 675 01:12:56,120 --> 01:13:02,200 other municipally owned utilities, we're now recommending any changes to our base rate. 676 01:13:02,200 --> 01:13:10,200 So $124.80, which is the average over that 12 month period is where we anticipate remaining 677 01:13:10,200 --> 01:13:14,880 going forward, at least to the beginning of the fiscal year. And certainly we'll evaluate 678 01:13:14,880 --> 01:13:23,880 that going after that in November. And this is just comparison to other municipally owned 679 01:13:23,880 --> 01:13:30,480 utilities, we'll refresh this data for you in November and as well as comparing it to 680 01:13:30,480 --> 01:13:41,920 some of the private IOUs as well. So the next item here is our FTE summary. As you can see, 681 01:13:41,920 --> 01:13:51,760 I did want to point out that the total for FY 2021 is actually 169 FTEs. And so if you 682 01:13:51,760 --> 01:14:02,120 compare that from our 19-20, that's a 20 FTE reduction. I did go back and I looked in FY 683 01:14:02,120 --> 01:14:10,520 17-18 as an example, we were at 199 FTEs. Now 10 of those FTEs were related to a transfer 684 01:14:10,520 --> 01:14:18,120 of a tech operation, a tech services operation. And so the cost is still embedded as a transfer 685 01:14:18,120 --> 01:14:24,880 for DME, but the FTEs don't show up here. Some of these positions that have been reduced 686 01:14:24,880 --> 01:14:31,000 were directly related to the voluntary separation program. Some of those positions we've not 687 01:14:31,000 --> 01:14:38,120 requested to refill. A couple of examples, we had a superintendent that oversaw our metering 688 01:14:38,120 --> 01:14:45,280 division. We've opted to not refill that position and instead, we'll have a manager that is 689 01:14:45,280 --> 01:14:51,560 already in the division that will continue to run that. But that superintendent will 690 01:14:51,560 --> 01:14:56,280 not be replaced. I already mentioned to you that we've combined our two engineering groups. 691 01:14:56,280 --> 01:15:00,680 We had a transmission engineering group and a distribution engineering group. We've now 692 01:15:00,680 --> 01:15:06,480 combined those under a single engineering manager. That would be Jerry Fiedler, but 693 01:15:06,480 --> 01:15:12,440 we've not refilled the other position. So those are just a couple of examples, but certainly 694 01:15:12,440 --> 01:15:19,480 we have a reconciliation of those 20 positions across DME. We think that based on the FTE 695 01:15:19,480 --> 01:15:25,920 accounts that we have going into 2021, that we'll be in good shape. Certainly if things 696 01:15:25,920 --> 01:15:32,480 change, if there's service issues that we run against or other demands, we'll be happy 697 01:15:32,480 --> 01:15:37,800 to come back to the PB and to the council and justify additional FTEs either mid-year 698 01:15:37,800 --> 01:15:44,600 or going into 21, 22. But currently with the 169 FTEs, we feel pretty comfortable going 699 01:15:44,600 --> 01:15:53,360 into that year as far as labor. And then just briefly, my final slide here is just what 700 01:15:53,360 --> 01:15:59,760 the current organizational chart looks like. As you know, Terry Nolte is our assistant 701 01:15:59,760 --> 01:16:05,600 general manager. He oversees a number of areas, including our safety and training program 702 01:16:05,600 --> 01:16:12,960 that we are working to revamp and working with the city as well through an outside contract. 703 01:16:12,960 --> 01:16:18,400 And over the next six months, we'll continue to evaluate that program and our needs. And 704 01:16:18,400 --> 01:16:24,000 then we have Chris Lutrick, who's our executive manager of energy services. And among the 705 01:16:24,000 --> 01:16:29,900 things that Chris oversees currently is the metering division. Again, working closely 706 01:16:29,900 --> 01:16:37,240 with those folks to really make improvements in that area. And I'll mention as well, Terry 707 01:16:37,240 --> 01:16:41,160 also oversees our engineering group and is working very closely with them as we continue 708 01:16:41,160 --> 01:16:47,840 to merge those two divisions. And then some of the other folks that we have on here, currently 709 01:16:47,840 --> 01:16:53,040 Smith Day oversees most of our cyber and physical security, our risk management office, and 710 01:16:53,040 --> 01:16:58,080 also we've recently combined our administrative assistance into an administrative pool to 711 01:16:58,080 --> 01:17:04,920 provide better service across all our divisions of DME. And then presently, the line operations 712 01:17:04,920 --> 01:17:12,160 groups under Brad Watts and Rowdy Patterson and also our substation group under Sam Bridges, 713 01:17:12,160 --> 01:17:17,200 they currently report to me as the general manager. I will tell you that over the next 714 01:17:17,200 --> 01:17:25,760 few weeks, we'll be looking at this organization as I look at across all our utilities on where 715 01:17:25,760 --> 01:17:31,560 my time need to be spent. And so we may update this chart in the next few weeks. If we do 716 01:17:31,560 --> 01:17:38,000 that, we'll get that back out to you. So you're aware on what the organizational chart will 717 01:17:38,000 --> 01:17:46,640 look like going forward. So with that, that concludes my portion of the operational section 718 01:17:46,640 --> 01:17:54,400 and I'm happy to answer any questions or we can certainly go to the financial section 719 01:17:54,400 --> 01:18:06,360 with Nick. Madam Chair, what is your pleasure? You'll need to minimize the presentation, 720 01:18:06,360 --> 01:18:15,240 Tony. I'm trying to do that. I think people do already have questions and I want to note 721 01:18:15,240 --> 01:18:22,280 that Billy Cheek needed to hop off. He had a 1030 meeting, so I should make sure that's 722 01:18:22,280 --> 01:18:31,480 in the minutes. Okay, Charlie, you had your hand up first. Quick question on the employment 723 01:18:31,480 --> 01:18:41,480 summary on page six. I see that you have 189 full-time equivalent employees right now and 724 01:18:41,480 --> 01:18:51,840 then the vacant of 43. Does that mean you have 43 places you could fill, making it 232? 725 01:18:51,840 --> 01:19:02,560 Or does that mean that you currently have 146 employees? So we have 189 positions budgeted. 726 01:19:02,560 --> 01:19:11,280 Got it. Going into this, we had 43 vacancies, but we've refilled 19 of those vacancies. 727 01:19:11,280 --> 01:19:19,320 And so the difference there, that's what 165. Okay. That's correct. So going into next fiscal 728 01:19:19,320 --> 01:19:26,280 year, 165, that's what we anticipate having as far as labor. Okay. So the labor is essentially 729 01:19:26,280 --> 01:19:33,960 a no change. From where we are currently, that's correct. But from the budget, it is 730 01:19:33,960 --> 01:19:42,480 a reduction of 20 FTEs. Absolutely. Thank you. Yes, sir. Russ, go ahead. Yes, 20. In 731 01:19:42,480 --> 01:19:48,720 looking at the utility rate cost per megawatt hour graph that you had up there, I think 732 01:19:48,720 --> 01:19:59,000 on slide five, something like that, I noticed that Garland and Bryan had lower rates than 733 01:19:59,000 --> 01:20:04,960 the city of Denton. And Garland and Bryan were also in the Texas municipal power agency, 734 01:20:04,960 --> 01:20:11,120 correct? That's correct. So what I'm wondering is, do you know, maybe there's no answer to 735 01:20:11,120 --> 01:20:16,160 this right now. I don't want to belabor the point, but do you know why their average rates 736 01:20:16,160 --> 01:20:22,040 are lower than ours? Well, certainly, I think, you know, one of the explanations is they 737 01:20:22,040 --> 01:20:28,040 have more customers than we do. And so they have a much broader base for them to spread 738 01:20:28,040 --> 01:20:32,880 their costs and be able to have lower rates. But they also have a slightly different operation 739 01:20:32,880 --> 01:20:37,080 when it comes to EML and their QSC services. And so they have a little bit more diversity 740 01:20:37,080 --> 01:20:42,480 and in some of their non base rate revenue that comes into their utility, that also helps 741 01:20:42,480 --> 01:20:48,120 prop some of those base rates down for those utilities. We can certainly take a closer 742 01:20:48,120 --> 01:20:52,120 look at that. And then when we come back in November, we can certainly give you a little 743 01:20:52,120 --> 01:20:56,680 bit more insights into why that may be. Okay, thank you. Yes, sir. 744 01:20:56,680 --> 01:21:05,000 Any other questions? I have one, Tony. Can you remind me what the percentage of our underground 745 01:21:05,000 --> 01:21:12,440 electric, I mean, that always helps with our outage management. So hold on, I'm looking 746 01:21:12,440 --> 01:21:19,920 at Terry, see if Terry, Terry has that percentage. I don't have the exact percentage. Just approximate, 747 01:21:19,920 --> 01:21:27,400 you know? Yeah, it's about, I think it's about 40% underground. About 20%? 40. About 40%. 748 01:21:27,400 --> 01:21:33,400 Okay. All right. And then as we're developing, we're doing underground. And any new developments 749 01:21:33,400 --> 01:21:38,600 are required to have underground, yes ma'am. So all of Hunter Cole Ranch will, as an example, 750 01:21:38,600 --> 01:21:44,080 will all be underground. Okay. All right. Thank you. I guess there's no other questions. 751 01:21:44,080 --> 01:22:02,080 Okay, with that, I'll turn it over to Nick. Thank you, Tony. Pull this back up. All right. 752 01:22:02,080 --> 01:22:11,680 Can everybody see that? Yes. Okay. So real quick, we'll go over the financial assumptions 753 01:22:11,680 --> 01:22:16,500 that are currently covered in this five-year forecast. Be certain. I can answer questions 754 01:22:16,500 --> 01:22:20,080 at the end if you have any when we get that slide. I think there's four or five slides 755 01:22:20,080 --> 01:22:23,120 to cover the financials. And like I said, we'll circle back in November, December with 756 01:22:23,120 --> 01:22:27,920 a detailed budget discussion for DME. So on the revenue side, we are currently, we do 757 01:22:27,920 --> 01:22:34,840 have a low growth of 3.2% forecasted for the five-year period. Our T-cost allowed rate 758 01:22:34,840 --> 01:22:42,400 of return. We are currently showing a 28.04% through 2022. To be conservative, we are showing 759 01:22:42,400 --> 01:22:48,440 this to decrease to 16% starting in 2023 through 2025. And I'll review that with you on the 760 01:22:48,440 --> 01:22:54,400 five-year forecast here shortly. Expenses, we do have the ROI. So city council recently 761 01:22:54,400 --> 01:23:01,400 approved rate of return increased to 3.5% to 6% for the electric utility to transfer 762 01:23:01,400 --> 01:23:05,600 to the general fund. I'll review this with you on the forecast here shortly. And this 763 01:23:05,600 --> 01:23:11,720 does account for about 11.7 million over the five-year period. We are not forecasting any 764 01:23:11,720 --> 01:23:17,240 sale to Gibbons Creek facility. We do have some money built in for the decommissioning 765 01:23:17,240 --> 01:23:22,020 of that site over the five-year period. That does make up $21 million. It's currently included 766 01:23:22,020 --> 01:23:27,920 in purchase power. And then ultimately, Tony reviewed the position changes with you. That 767 01:23:27,920 --> 01:23:35,280 does account for 1.7 million in savings starting in 2021. 768 01:23:35,280 --> 01:23:38,600 This is the five-year forecast for the electric fund. I will do my best to walk you through 769 01:23:38,600 --> 01:23:45,240 this from the left-hand side. You can see the adopted 2020 budget here in this column. 770 01:23:45,240 --> 01:23:51,600 We did have budget use of reserves of $6.9 million. As you move down the page, you can 771 01:23:51,600 --> 01:23:56,360 see, of course, we had no rate increase included in the adopted budget. Finally, down here 772 01:23:56,360 --> 01:24:01,720 in the yellow, you can see what we were forecasting the reserves to be at the end of the fiscal 773 01:24:01,720 --> 01:24:08,280 or the beginning of the fiscal year, so when we adopted the 2020 budget of $48.6. Moving 774 01:24:08,280 --> 01:24:12,040 to your right here, you can see the estimate column of 2020. We are forecasting to use 775 01:24:12,040 --> 01:24:17,120 a little bit less than reserves, about $3.4 million. So coming in a little bit better 776 01:24:17,120 --> 01:24:22,120 than we originally budgeted. Still see no rate increases. We are forecasting a little 777 01:24:22,120 --> 01:24:29,720 bit better ending fund balance of $73.2 million coming in this fiscal year. And then finally, 778 01:24:29,720 --> 01:24:34,160 here in the dotted line, you can see the proposed 2021 budget. We are not forecasting to use 779 01:24:34,160 --> 01:24:39,160 any reserves. We actually have all the reserve usage taken out. We are showing a net income 780 01:24:39,160 --> 01:24:45,080 of $295,000 for the proposed budget. No rate increases, as Tony has previously mentioned 781 01:24:45,080 --> 01:24:50,920 in his part of the presentation. And then the ending fund balance is $73.5 million. 782 01:24:50,920 --> 01:24:53,860 A couple of other things I want to point out on this slide, you can see the debt coverage 783 01:24:53,860 --> 01:25:00,880 ratio is 1.4. We currently have an internal policy of 1.25. And then you can see the reserve 784 01:25:00,880 --> 01:25:06,040 requirement. So in the electric fund, we budget a minimum of 60 days, which represents 16% 785 01:25:06,040 --> 01:25:12,120 of expenses. Our maximum target is 75 days, which represents 21% of expenses. So you can 786 01:25:12,120 --> 01:25:17,320 see that reserve of $73.5 million is definitely above that maximum. So we do have a healthy 787 01:25:17,320 --> 01:25:21,240 fund balance in the electric fund. A couple of other things I want to point out. So as 788 01:25:21,240 --> 01:25:26,320 I said on the previous slide, we do have no sell for the TNPA facility. We are accounting 789 01:25:26,320 --> 01:25:31,720 for $21 million in decommissioning expenses associated with that facility. That number 790 01:25:31,720 --> 01:25:36,200 is included in this purchase power number that you see. A couple other things that stand 791 01:25:36,200 --> 01:25:40,400 out on this reform I want to show you really quick. The rate of return, you can see it 792 01:25:40,400 --> 01:25:45,540 does increase. So we had $16 million in the adopted budget. We do show it coming in over 793 01:25:45,540 --> 01:25:52,060 budget $18.8 million. That is half of the year at the 6% rate of return for the general 794 01:25:52,060 --> 01:25:56,800 fund. I mean, you can see it continuing on. It does end in 2022 and 2023. It goes back 795 01:25:56,800 --> 01:26:04,320 down to $16.3. And then one other on the revenues, jumping back up here to the top really quick, 796 01:26:04,320 --> 01:26:11,440 that no rate revenues. You can't see the decrease between '22 and '23. And that is the decrease 797 01:26:11,440 --> 01:26:18,380 in the rate of return for those transmission assets. This is the deck pro forma. So this 798 01:26:18,380 --> 01:26:22,400 number is included in the previous pro forma that you saw. So total revenues for the electric 799 01:26:22,400 --> 01:26:27,920 fund. You can see the deck revenues are $24.5 million in the proposed budget. We do have 800 01:26:27,920 --> 01:26:33,880 expenses including debt service of $33.2 million. So we are currently budgeting a loss for the 801 01:26:33,880 --> 01:26:39,120 deck of $8.6 million. A couple things I want to point out. We did put a note in here at 802 01:26:39,120 --> 01:26:45,320 the bottom. The net income for the deck is decreasing. The Ford market is showing energy 803 01:26:45,320 --> 01:26:52,240 to cost less than the future, which is less need for the deck to produce energy for the 804 01:26:52,240 --> 01:26:57,120 city. So you can see as you track across here, it actually goes from $24.5 million in the 805 01:26:57,120 --> 01:27:01,520 current proposed budget to $11.5 million in the future years. We wanted to be sure to 806 01:27:01,520 --> 01:27:14,360 put that note on there for an explanation. This is the five-year CIP for the electric 807 01:27:14,360 --> 01:27:20,000 fund. A couple things I want to point out. We are budgeting about $6.8 million for distribution 808 01:27:20,000 --> 01:27:24,680 substations in this budget. We do have some street lighting funding in here. This is something 809 01:27:24,680 --> 01:27:29,000 Tony had previously communicated to city council we had budget for moving forward. So we do 810 01:27:29,000 --> 01:27:33,400 have $3 million in street lighting budget for the electric fund. Distribution total 811 01:27:33,400 --> 01:27:40,040 is about $32.2 million in bond funded projects. Transmission is about $32.8 million. This 812 01:27:40,040 --> 01:27:45,920 is that Hickory substation that Tony had mentioned. Total is $65 million in projects. Over the 813 01:27:45,920 --> 01:27:52,400 five-year period, you can see it's $237.6 million. And all this is accounted for in the five-year 814 01:27:52,400 --> 01:28:00,520 forecast that I just showed you. Electric rates. We're not looking to make any substantial 815 01:28:00,520 --> 01:28:04,560 changes to the electric rates. We will be bringing the rate ordinance back to you for 816 01:28:04,560 --> 01:28:08,820 adoption. What we would like to do leading up to the conversation in November and December 817 01:28:08,820 --> 01:28:13,440 is make minimum updates to the electric rate ordinance. Currently, we are proposing to 818 01:28:13,440 --> 01:28:17,280 change the following rates that are included in this table. The first one being the residential 819 01:28:17,280 --> 01:28:23,180 renewable energy services rider. Also referred to as the RG. All customers now receive 100% 820 01:28:23,180 --> 01:28:27,920 renewable energy. So we are just looking to take this out of the rate ordinance. Weekend 821 01:28:27,920 --> 01:28:33,000 services. This is another one we're looking to do away with. We actually in a recent audit, 822 01:28:33,000 --> 01:28:37,500 we did reveal that customers were hitting their monthly peak during the week instead 823 01:28:37,500 --> 01:28:43,080 of the weekends. Downtown decorative lighting. This rating is known or applicable. So we 824 01:28:43,080 --> 01:28:50,000 are looking to take this out. The dark fiber. This rate is currently in the electric ordinance. 825 01:28:50,000 --> 01:28:54,600 This will move over to tech services and tech services will show on their schedule of fees. 826 01:28:54,600 --> 01:28:58,080 So we are coordinating with them currently to make sure that makes its way into their 827 01:28:58,080 --> 01:29:02,880 fees. The banner install fee. We are working with development services to take this out 828 01:29:02,880 --> 01:29:09,520 of the electric ordinance. We should have a consensus among staff soon, but we are currently 829 01:29:09,520 --> 01:29:14,440 recommending to take it out of the electric rate ordinance. Commercial renewable energy 830 01:29:14,440 --> 01:29:19,440 services. CGR. Also similar to the residential renewable. We are looking to take this out. 831 01:29:19,440 --> 01:29:25,240 All customers do receive 100% renewable energy. And then the independent wholesale generator 832 01:29:25,240 --> 01:29:33,360 IWG. We are also looking to do away with that rate. And then for reference, if anybody had 833 01:29:33,360 --> 01:29:37,960 this question, there's 186 residential customers currently on the RG rate, which is average 834 01:29:37,960 --> 01:29:45,960 annual savings of 47.36. Next step. So as Tony has previously communicated, we do have 835 01:29:45,960 --> 01:29:51,800 a special called meeting with you on August 3rd to talk about the remainder of the utilities. 836 01:29:51,800 --> 01:29:56,600 We will discuss water, wastewater and solid waste during that meeting. So we'll be bringing 837 01:29:56,600 --> 01:30:01,080 that back forward to you. This actually will go forward to city council on July 30th. This 838 01:30:01,080 --> 01:30:05,240 does say July 28th. So that is a typo. That should be the 30th. We will discuss this with 839 01:30:05,240 --> 01:30:11,120 the city council during a budget work session. We will circle back with the PBB on August 840 01:30:11,120 --> 01:30:17,720 10th to review the budget one final time and seek your approval for that in the rates and 841 01:30:17,720 --> 01:30:22,720 then September 15th this year, the city council was scheduled to adopt the budget, the tax 842 01:30:22,720 --> 01:30:26,560 rate and the capital improvement plan. And then as Tony has mentioned November, December 843 01:30:26,560 --> 01:30:30,720 timeframe, we will circle back to the PBB and city council for a detailed rate and budget 844 01:30:30,720 --> 01:30:36,440 discussion. But that that'll conclude the financial portion of the presentation. And 845 01:30:36,440 --> 01:30:43,520 if you give me a second, I will pull it down or you can ask questions. Okay. Questions. 846 01:30:43,520 --> 01:30:52,160 Go ahead, Russ. Yeah. What is the biggest risk factor in your opinion to hitting the 847 01:30:52,160 --> 01:30:57,520 projected budgeted numbers you have for the coming year? All of these assumptions have 848 01:30:57,520 --> 01:31:03,000 some amount of risk to them. What do you think is the most risky assumption that you've made 849 01:31:03,000 --> 01:31:10,520 in your budget for the coming year? Um, do you mean to do directly related to the pandemic 850 01:31:10,520 --> 01:31:16,600 or just the load forecast that we currently have plugged in or or is it both? All of them. 851 01:31:16,600 --> 01:31:22,720 All of the factors that go into making your annual budget projection. Let me, let me, 852 01:31:22,720 --> 01:31:25,620 let me answer one part of it and then I'll turn it over to Terry Nolte. They'll address 853 01:31:25,620 --> 01:31:30,200 the load factor of it. Um, the first part is so the COVID pandemic on the utilities, 854 01:31:30,200 --> 01:31:33,680 we are currently monitoring that for each of the utilities to see what the financial 855 01:31:33,680 --> 01:31:39,560 impact will be. And we do have a revenue loss assumption in the electric proforma now. That 856 01:31:39,560 --> 01:31:43,240 is one reason we want to circle back with you November and December. So around the October 857 01:31:43,240 --> 01:31:47,280 timeframe, we'll actually get that hard data of how the pandemic has impacted the utilities 858 01:31:47,280 --> 01:31:51,480 from a billing standpoint. So we'll be able to true that number up in the proforma when 859 01:31:51,480 --> 01:31:55,120 we come back to you. Um, now with that being said, let me turn it over to Terry for the 860 01:31:55,120 --> 01:32:05,280 load portion of it. I mean, he can address that question. 861 01:32:05,280 --> 01:32:11,280 So financially, the, uh, the largest risk that we always face is the, uh, the price 862 01:32:11,280 --> 01:32:18,520 formation in the air cop market. Um, you know, each year we project, uh, our revenues and 863 01:32:18,520 --> 01:32:26,120 our, our, uh, our expenses, expenses being loved, uh, the expenses to purchase energy 864 01:32:26,120 --> 01:32:33,100 from the market, uh, to serve the load and, uh, the estimates of what we, what revenues 865 01:32:33,100 --> 01:32:39,700 will achieve from the sales of renewable energy and deck energy to the market. Uh, those forecasts 866 01:32:39,700 --> 01:32:46,660 are based upon visibly traded forward markets, which change like the stock market does from 867 01:32:46,660 --> 01:32:53,820 hour to hour, day to day. Uh, we do have a hedge plan that we, uh, are executing against 868 01:32:53,820 --> 01:33:02,160 in order to, uh, try to stabilize those revenues and, uh, those expenses as best as possible. 869 01:33:02,160 --> 01:33:07,580 But we, uh, because of our, the nature of our portfolio, which is heavily driven by 870 01:33:07,580 --> 01:33:15,440 weather events, mainly wind and, and solar intensity, there's a large portion of the 871 01:33:15,440 --> 01:33:22,280 supply that we cannot forward hedge because we don't know, uh, exactly what the output 872 01:33:22,280 --> 01:33:30,280 would be. So that's the biggest single risk, uh, looking forward financially, the biggest, 873 01:33:30,280 --> 01:33:36,520 one of the bigger risks. Uh, and we've, as Nick mentioned, we've, uh, we've conservatively 874 01:33:36,520 --> 01:33:46,300 forecasted our T-cost revenues. Uh, T-cost returns are 28.04%. Uh, last year, uh, provided 875 01:33:46,300 --> 01:33:54,980 about 17, a little over $17 million of incremental, uh, non-rate revenue for the benefit of customers 876 01:33:54,980 --> 01:34:01,900 to the extent that that T-cost revenue, uh, diminishes as a result of a, a filing that 877 01:34:01,900 --> 01:34:07,520 we would be called in to make, uh, and lower the allowed rate of return. That would have 878 01:34:07,520 --> 01:34:14,320 a significant impact in the out years. We don't anticipate such a call, uh, for at least 879 01:34:14,320 --> 01:34:19,520 two to three years. Uh, but to be prudent, we are including that reduction. So those 880 01:34:19,520 --> 01:34:23,040 are the two biggest financial risks, uh, that we face. 881 01:34:23,040 --> 01:34:29,480 Is that an interesting question? It does. I was just, one other thing, uh, 882 01:34:29,480 --> 01:34:36,440 I was curious about the, uh, the demand on ERCOT. Uh, people are, are moving into Texas. 883 01:34:36,440 --> 01:34:42,760 That's generally known. So I would think the demand on ERCOT as a system is going to increase 884 01:34:42,760 --> 01:34:47,520 in the next year compared to what it is this year. Is there a, is there an estimate on 885 01:34:47,520 --> 01:34:56,560 what the system demand increase might be in terms of percentage or megawatt hours or whatever? 886 01:34:56,560 --> 01:35:01,560 I think as a market, the market is growing at about two to two and a half percent per 887 01:35:01,560 --> 01:35:08,640 year on annual, on peak demand. That would be the instantaneous hourly peak demand across 888 01:35:08,640 --> 01:35:15,560 the market. Uh, but we are seeing, uh, as, as our forecast shows about three and a half, 889 01:35:15,560 --> 01:35:22,760 3.2 to three and a half percent, uh, annual energy increase. So across the year, the total 890 01:35:22,760 --> 01:35:29,440 kilowatt hours, uh, consumed by customers is increasing at a greater rate than the peak 891 01:35:29,440 --> 01:35:37,280 demand is. The peak demand, uh, is met, uh, through capacity additions in the marketplace, 892 01:35:37,280 --> 01:35:46,520 which are primarily renewables, wind and solar, uh, which, uh, the solar tends to be very 893 01:35:46,520 --> 01:35:53,360 highly correlated with peak demand, summer, hottest day of the summer. Uh, but the wind 894 01:35:53,360 --> 01:35:59,640 is not as well correlated. It doesn't necessarily show up as we saw, uh, last summer on the 895 01:35:59,640 --> 01:36:04,560 hottest day of the year. Uh, there was very little wind output in West Texas and that 896 01:36:04,560 --> 01:36:11,440 caused prices to go up. And, uh, that, uh, goes to the issue that I mentioned before, 897 01:36:11,440 --> 01:36:17,480 which is that price formation. Um, no one has a crystal ball. That's, that's, uh, clear 898 01:36:17,480 --> 01:36:25,640 enough to predict what each hourly price is going to, uh, show up as in the future and 899 01:36:25,640 --> 01:36:31,920 very high prices while, while they have benefits for the deck revenue and debt gross margin, 900 01:36:31,920 --> 01:36:38,840 uh, they have an offsetting effect of high purchase power costs to, to meet the load. 901 01:36:38,840 --> 01:36:44,920 So, uh, as we've mentioned to you before, the deck acts as an insurance policy to insulate 902 01:36:44,920 --> 01:36:52,080 the load from those super high prices, but it generally nets out. Uh, we receive $9,000 903 01:36:52,080 --> 01:36:57,840 for energy delivered from the deck and we purchase energy at $9,000 so that nets out, 904 01:36:57,840 --> 01:37:02,920 but customers aren't exposed to that. So, uh, that's the benefit of our portfolio and 905 01:37:02,920 --> 01:37:09,100 having that, that component in the supply portfolio to kind of insulate our, our customers 906 01:37:09,100 --> 01:37:26,720 from those high price periods. Okay. Thank you. Questions. All right. So what do you 907 01:37:26,720 --> 01:37:34,960 need from us, Mario? Just really nothing. Uh, madam chair, it's just a presentation 908 01:37:34,960 --> 01:37:39,440 like we typically do during the budget cycle. So it's really just to be able to bring those 909 01:37:39,440 --> 01:37:44,160 in that those pieces of information to you all, allow you all to ask whatever questions 910 01:37:44,160 --> 01:37:49,280 you have of staff and, and, uh, if the council asks questions about the, what the thoughts 911 01:37:49,280 --> 01:37:54,320 with the pub, we'll be able to relate those to them as well. And you'll be seeing similar 912 01:37:54,320 --> 01:37:58,840 presentations from the other utilities, uh, next Monday at your special meeting. I believe 913 01:37:58,840 --> 01:38:06,720 that said eight 30 or started eight 30 on Monday, the third. Yep. And, um, Billy cheek 914 01:38:06,720 --> 01:38:11,000 did say that he will not have to leave early next Monday. He has to leave, he had to leave 915 01:38:11,000 --> 01:38:18,280 early this Monday. So, okay. And I think before we, I don't want to get in if we are adjourning 916 01:38:18,280 --> 01:38:26,720 soon, I believe Mr. Collister may have a question or a statement to make. Yes. I make sure. 917 01:38:26,720 --> 01:38:31,080 I was talking to the city attorney and we just, we discussed this before the lawsuit 918 01:38:31,080 --> 01:38:35,140 is a personnel matter, which is really, which is outside the purview of the PB under the 919 01:38:35,140 --> 01:38:41,400 charter and there has not been a judgment entered yet by the court. Once the judgment 920 01:38:41,400 --> 01:38:46,720 is entered, you'll be able to take the, uh, impact of that judgment consideration with 921 01:38:46,720 --> 01:38:53,840 a budget. And that's as far as we can go right now. Absent council providing direction, uh, 922 01:38:53,840 --> 01:38:58,360 for us to give you all a briefing. And if you want to make a request to council to go 923 01:38:58,360 --> 01:39:07,880 into the details of the lawsuit, that can be done. Okay. Do we, how does the board feel? 924 01:39:07,880 --> 01:39:13,480 Do they want, do you want to make a request to city council? Yeah, I would personally 925 01:39:13,480 --> 01:39:18,700 like to know what's going on there. And if there's, if it's going to require any kind 926 01:39:18,700 --> 01:39:23,720 of a change in policy with the utilities, the way they handle personnel or anything 927 01:39:23,720 --> 01:39:31,200 like that, perhaps we could discuss that. I know there's feeling, I know how Charlie 928 01:39:31,200 --> 01:39:40,200 feels Barbara. Yes, I agree. Okay. Karen. I understand the reasons why we can't be, 929 01:39:40,200 --> 01:39:46,400 you know, apprised of details. I mean, yeah, I think I brought this up when it first started 930 01:39:46,400 --> 01:39:52,320 hitting the newspaper quite a while ago. And so I'm satisfied with the fact that, you know, 931 01:39:52,320 --> 01:40:14,000 it's a personnel matter that we can't really throw. Yeah. And sorry. Yeah. I agree with 932 01:40:14,000 --> 01:40:21,080 Karen's assessment of the situation. So kind of a split here. Cause I, I understand it's 933 01:40:21,080 --> 01:40:26,560 a personnel matter and I'm waiting, I'm willing to wait until the court puts in a judgment. 934 01:40:26,560 --> 01:40:33,840 I don't see any reason at this point to put staff through that work. When we, when it, 935 01:40:33,840 --> 01:40:38,840 when, once it's settled, we can get the big picture. Larry, when you say the judgment 936 01:40:38,840 --> 01:40:46,040 has not been entered, I learned from the paper that the jury has found against the city of 937 01:40:46,040 --> 01:40:54,000 Denton and the city, is this on appeal or has the judgment itself not been? The judgment 938 01:40:54,000 --> 01:40:59,580 itself has not been entered. There was a discussion among both sides on the form of the judgment 939 01:40:59,580 --> 01:41:07,200 and it's been going on for quite a while. And the, and the state has also entered in 940 01:41:07,200 --> 01:41:13,480 to lawsuit with respect to caps on the judgment amounts and the court has ruled in their favor 941 01:41:13,480 --> 01:41:19,160 on that. There, there's a lot more to be done. The court has ruled in his favor. The court 942 01:41:19,160 --> 01:41:22,800 ruled in the favor of the state, which is essentially in favor of the city about putting 943 01:41:22,800 --> 01:41:32,160 limitations on the damage caps. Okay. I would argue these are the kinds of things that help 944 01:41:32,160 --> 01:41:44,280 us stay up to speed on that. The other question is what, what fund do you anticipate resolving 945 01:41:44,280 --> 01:42:00,120 the costs of this litigation and judgment? Let Finance answer that question. Nick Vinson, 946 01:42:00,120 --> 01:42:04,680 assistant director of finance. This would come from the electric fund. I'm taking your 947 01:42:04,680 --> 01:42:11,360 question. Okay. Then I would renew my mention that it's relevant to the public utilities 948 01:42:11,360 --> 01:42:21,760 board. Thanks. Well, maybe we should discuss it again on the third, since Billy's not here 949 01:42:21,760 --> 01:42:28,480 and can't weigh in and we were basically split. So, so what we'll do is we'll go, we'll go 950 01:42:28,480 --> 01:42:35,520 ahead and keep it on the matrix like it has. And so we'll, I'll ask Kim Mankin to go ahead 951 01:42:35,520 --> 01:42:40,840 and put a management report item like we normally would for a normal meeting. And that way, 952 01:42:40,840 --> 01:42:46,960 if you do have a seven or an odd number, that way the board can give direction one way or 953 01:42:46,960 --> 01:42:52,480 the other on how you would like to proceed since you're tied three, three, it is an important 954 01:42:52,480 --> 01:43:00,040 subject. I am not saying that that it's not, it, it impacts the utility greatly. Just it's 955 01:43:00,040 --> 01:43:08,160 not settled yet. So, all right. With that, do we have a motion to adjourn? So I move. 956 01:43:08,160 --> 01:43:12,920 All right. I guess we're adjourned. Have a great one. Take care. Thank you.