1 00:00:00,000 --> 00:00:19,020 Great. We'll kick off the meeting of the Bond Oversight Committee and Brandon, if you want 2 00:00:19,020 --> 00:00:27,620 to introduce the first item. I will. Item A is consider the approval of the draft meeting 3 00:00:27,620 --> 00:00:40,960 minutes of January 16, 2020. I hear a motion. I'll move approval. I have a motion. Anyone 4 00:00:40,960 --> 00:00:52,600 second? I'll second. So we have a motion and a second. Any discussion? And then do 5 00:00:52,600 --> 00:01:03,400 we want to just ask for nays? David, is that appropriate? I think that's fine, yes. Is 6 00:01:03,400 --> 00:01:13,600 there anybody that doesn't approve the meeting minutes? Hearing none, motion passes. Item 7 00:01:13,600 --> 00:01:21,640 B, receive nominations and elect a vice chairperson of the Bond Oversight Committee. Good afternoon. 8 00:01:21,640 --> 00:01:29,240 At the last meeting, we did vote on a vice chair, but because we were only posted for 9 00:01:29,240 --> 00:01:34,200 the chairperson, we brought this item back on this agenda so that you could formally 10 00:01:34,200 --> 00:01:41,040 vote on a vice chair. So obviously could welcome any nominations at this time. I'll nominate 11 00:01:41,040 --> 00:01:50,440 Brandon McCleskey. I'll second. So we have a motion and a second to nominate Brandon 12 00:01:50,440 --> 00:02:07,860 McCleskey as vice chairperson. Any discussion? Anybody opposed? Hearing none, motion passes. 13 00:02:07,860 --> 00:02:13,000 Item C, receive a report, hold a discussion and give staff direction regarding the general 14 00:02:13,000 --> 00:02:22,360 obligation funded capital projects. Great. Well, with this item, you had the items that 15 00:02:22,360 --> 00:02:26,440 we traditionally bring forward at each one of the Bond Oversight Committees, the agenda 16 00:02:26,440 --> 00:02:31,960 information sheet, which had had a status update on each one of our bond program projects 17 00:02:31,960 --> 00:02:40,160 from the 2012, 2014, and 2019 bond programs, and our bond oversight report, the spreadsheet 18 00:02:40,160 --> 00:02:45,400 that walks forward our current budgets for each of those projects, our expenditures, 19 00:02:45,400 --> 00:02:50,280 encumbrances, and the remaining balances. We also have our bond issuance timelines that 20 00:02:50,280 --> 00:02:54,240 have been updated that are included in this item. I know it's been obviously a number 21 00:02:54,240 --> 00:03:02,080 of months since we met due to COVID and changing our format of the meeting. So we have a lot 22 00:03:02,080 --> 00:03:06,720 to go through. So what we've done for this item is we have three separate presentations 23 00:03:06,720 --> 00:03:13,240 for our streets projects, our facilities projects, and our parks projects. So we'll have Todd 24 00:03:13,240 --> 00:03:19,440 Estes go through the streets projects in one presentation, Gary Packin for the parks projects, 25 00:03:19,440 --> 00:03:25,440 and then Scott Gray, our director of facilities, will go through the facilities PowerPoint projects. 26 00:03:25,440 --> 00:03:29,800 Obviously we can take questions for each of those presentations as we go through them. 27 00:03:29,800 --> 00:03:35,760 Or if you have any questions on the status reports or the bond oversight report itself, 28 00:03:35,760 --> 00:03:41,280 we have staff available to answer any detailed questions as well. So unless there's any initial 29 00:03:41,280 --> 00:04:09,840 questions, I'll hand it over to Todd Estes I believe will be first and we can go through 30 00:04:09,840 --> 00:04:28,080 them. Is Todd here yet David? 31 00:04:28,080 --> 00:04:35,840 This is Ethan Cox, general manager of public works. I just got a notice from Becky that 32 00:04:35,840 --> 00:04:39,640 Todd is running a little late and be there about 1145. 33 00:04:39,640 --> 00:04:57,320 Okay. Why don't we skip to Gary then. 34 00:04:57,320 --> 00:05:06,800 Okay Gary Packin director of parks and recreation. Can everybody hear me? 35 00:05:06,800 --> 00:05:10,760 We can hear you Gary. Okay, perfect. All right, so we have a number 36 00:05:10,760 --> 00:05:14,520 of staff here as well that they can chime in, but I'm going to go through these slides 37 00:05:14,520 --> 00:05:22,160 and if you have any questions, feel free to ask. Next slide. We've been pretty aggressive 38 00:05:22,160 --> 00:05:29,440 over the past few years with our playgrounds. In 2018, we created a playground replacement 39 00:05:29,440 --> 00:05:34,960 plan that outlines every playground in the park system, what company it is at square 40 00:05:34,960 --> 00:05:41,920 footage, what year it was installed. Typically playgrounds have a 15-year lifespan. So we 41 00:05:41,920 --> 00:05:46,960 use that as the template the follow. Obviously sometimes playgrounds need to replace sooner 42 00:05:46,960 --> 00:05:53,000 based on vandalism. If they're in the sun, they degrade faster and how much use. If they're 43 00:05:53,000 --> 00:05:58,520 in the shade, they may last a little bit longer. So we have playgrounds that are in need of 44 00:05:58,520 --> 00:06:03,440 replacement probably sooner than 15 years. We have some that are older than 15 years 45 00:06:03,440 --> 00:06:10,520 that we could keep pushing forward. It may not need to replace as soon. We have replaced 46 00:06:10,520 --> 00:06:16,840 all the playgrounds in the original bond program except for McKenna. There was some discussion 47 00:06:16,840 --> 00:06:23,440 a few years ago about McKenna being an inclusive playground. With the topography of that site, 48 00:06:23,440 --> 00:06:29,520 we felt that that might not be the best location. And we actually, during our master plan meetings 49 00:06:29,520 --> 00:06:35,760 last year, we met with the community and talked about locations. We talked about Southwest 50 00:06:35,760 --> 00:06:40,920 Park for that inclusive playground and North Lakes Park. And they liked North Lakes Park 51 00:06:40,920 --> 00:06:47,520 better because of its accessibility with a bus route. But regardless of that, McKenna 52 00:06:47,520 --> 00:06:54,760 is under design right now. What you see this blue one on the top is the replacement playground 53 00:06:54,760 --> 00:07:01,840 for McKenna. We have received quotes on that and we're ready to take that to City Council. 54 00:07:01,840 --> 00:07:08,000 So we are moving forward to get that one done. We would like to request in a later item that 55 00:07:08,000 --> 00:07:15,400 the funding for McKenna be redirected to other playgrounds. We do have a lot of our land 56 00:07:15,400 --> 00:07:21,920 dedication and development funds in that park area. So we'd like to use that first and then 57 00:07:21,920 --> 00:07:27,280 reallocate that money for other playgrounds in the park system. And that's another agenda 58 00:07:27,280 --> 00:07:33,720 item for you guys to consider. We are replacing some other playgrounds in addition to the 59 00:07:33,720 --> 00:07:39,600 ones on the bond committee list as well. Joe Skiles being one that's part of that agenda 60 00:07:39,600 --> 00:07:45,720 item and possibly the design for an inclusive play structure, which I can provide in item 61 00:07:45,720 --> 00:07:55,240 E. Next slide. This park improvements, Lake Forest, Milam, they were completed. That money 62 00:07:55,240 --> 00:08:01,560 was actually reallocated to another project for the tennis courts because this was completed 63 00:08:01,560 --> 00:08:09,960 through a donation. Next slide. The South Lakes tennis courts have been, they were designed, 64 00:08:09,960 --> 00:08:16,120 we've been waiting on the completion of the design for the North Lakes tennis center. 65 00:08:16,120 --> 00:08:19,720 We needed to go back and do some additional design on these courts. So that's being done 66 00:08:19,720 --> 00:08:25,160 right now. So there's a slight delay there. So those would get bid out hopefully this 67 00:08:25,160 --> 00:08:31,240 fall. There will be two additional courts there with additional lighting possibly put 68 00:08:31,240 --> 00:08:39,880 on the existing courts pending funding availability. Property acquisition. Last March, we, we were 69 00:08:39,880 --> 00:08:46,000 we began creating a database of land throughout the city that we could use to work from to 70 00:08:46,000 --> 00:08:52,440 identify where we may want to buy land. Right around that same time, city council adopted 71 00:08:52,440 --> 00:09:00,100 a 10 minute walk as a policy for the department. And that initially is giving us guidance to 72 00:09:00,100 --> 00:09:06,200 identify where we need land to make sure that park space is available to every resident 73 00:09:06,200 --> 00:09:12,600 with a 10 minute walk or a half mile. So that's kind of the standard that we're using to help 74 00:09:12,600 --> 00:09:18,960 us identify where we need to, where we need to identify future parkland. So with council, 75 00:09:18,960 --> 00:09:25,040 we went to council last March and provided kind of a philosophy on how we look at land 76 00:09:25,040 --> 00:09:33,720 and how we prioritize land based off of acreage costs, the tree stand, the type of trees on 77 00:09:33,720 --> 00:09:40,600 the property, location to other assets in the city, schools, other parks, trails, those 78 00:09:40,600 --> 00:09:47,320 types of things, and use that to start identifying where that land could be. Then unfortunately, 79 00:09:47,320 --> 00:09:52,700 we hit COVID and we tightened up the budget for the city and that money was kind of put 80 00:09:52,700 --> 00:09:58,200 on hold until further notice. And then just recently we were given approval to move forward 81 00:09:58,200 --> 00:10:04,240 on that. So we are going back to city council in August. We're updating that spreadsheet 82 00:10:04,240 --> 00:10:09,920 and a PowerPoint to provide them a list of properties that we'd like to consider. Some 83 00:10:09,920 --> 00:10:16,040 of those are for purchase and some of those properties are in acquisition through development, 84 00:10:16,040 --> 00:10:20,160 through our land dedication and development process. So some of those will be free to 85 00:10:20,160 --> 00:10:27,120 the city and then some will have to pay. This funding was focused more towards South Denton. 86 00:10:27,120 --> 00:10:34,200 So those are the, that's the area that we're looking at for this funding. Next slide. Southwest 87 00:10:34,200 --> 00:10:39,180 Park Master Plan and Design. Coincidentally, Drew and I were out at the park this morning 88 00:10:39,180 --> 00:10:45,480 with our consultants walking around and driving on four wheelers, exploring the property with 89 00:10:45,480 --> 00:10:53,040 our development, our design team. We had a kickoff meeting earlier this month. We are 90 00:10:53,040 --> 00:11:00,960 putting together a citizen focus group of neighbors, park users, those types of people 91 00:11:00,960 --> 00:11:05,360 and we'll have a number of focus groups throughout this planning process and then we'll also 92 00:11:05,360 --> 00:11:10,040 have a number of public meetings to gather feedback. We're tentatively scheduled to have 93 00:11:10,040 --> 00:11:17,080 our first focus group meeting on August 20th, our first public meeting on August 27th. That 94 00:11:17,080 --> 00:11:25,960 will be a Zoom public meeting. We have $1.2 million for the total cost of the project 95 00:11:25,960 --> 00:11:36,320 itself. We've done some design work and some survey work. The contract for the actual consultant 96 00:11:36,320 --> 00:11:43,320 is under $200,000. So we are asking for an additional $75,000 be redirected from this 97 00:11:43,320 --> 00:11:50,120 project to our Parks, Recreation and Trail System Master Plan. That is item F on your 98 00:11:50,120 --> 00:11:56,320 agenda so we can talk a little bit more detail when we get to that point. Next slide. The 99 00:11:56,320 --> 00:12:03,740 spray ground. This was completed and dedicated in May of 2018. Very heavily used. Unfortunately, 100 00:12:03,740 --> 00:12:08,320 this year we have not opened it yet because of COVID. It's rather small and you can see 101 00:12:08,320 --> 00:12:13,560 the picture of the dedication down there. That's not quite six foot distancing. So we 102 00:12:13,560 --> 00:12:19,880 have not opened up that facility. Staff has built restrooms adjacent to that. That was 103 00:12:19,880 --> 00:12:34,200 part of a CDBG grant and that was completed this spring. Next slide. Trail system expansion. 104 00:12:34,200 --> 00:12:40,480 This obviously has been completed and is heavily used. It passes our new dog park that we opened 105 00:12:40,480 --> 00:12:46,320 back in December. We really actually designed the dog park around the curvilinear nature 106 00:12:46,320 --> 00:12:53,640 of this trail that goes up to the animal shelter. It goes north up to North Point Park and then 107 00:12:53,640 --> 00:12:59,500 it follows Cooper Creek. We are putting together as part of our Parks, Recreation and Trails 108 00:12:59,500 --> 00:13:07,540 master plan system a number of trails throughout the city. This one would carry along Cooper 109 00:13:07,540 --> 00:13:13,600 Creek. So we're looking forward to communicating with the public and getting some additional 110 00:13:13,600 --> 00:13:20,960 feedback on that in the next few weeks. Next slide. The tennis under construction. This 111 00:13:20,960 --> 00:13:26,560 is broken into two phases. The pro shop is under construction. That will be completed 112 00:13:26,560 --> 00:13:33,320 in early 2021. We went back and forth with USTA a number of times in regards to the design 113 00:13:33,320 --> 00:13:38,800 of the tennis courts to make sure that they were on board with everything we did and they 114 00:13:38,800 --> 00:13:44,760 approved the design. We have reached out to them for a grant of $100,000 that would go 115 00:13:44,760 --> 00:13:50,720 towards new facilities construction. So that is pending. We have not heard yet on that 116 00:13:50,720 --> 00:13:57,400 one. But we were released to move forward on this this month as well. And that is going 117 00:13:57,400 --> 00:14:05,240 to be going out to bid hopefully next 30 days. And this is this is the phase two that I just 118 00:14:05,240 --> 00:14:11,540 talked about the bid process. The bond program did call for 12 courts. We've master planned 119 00:14:11,540 --> 00:14:17,080 more than 12 courts so we could grow into that facility. And we did submit that $100,000 120 00:14:17,080 --> 00:14:21,360 grant. One additional thing, we're working with a public art committee to eventually 121 00:14:21,360 --> 00:14:27,880 put some public art within this facility. That has not been commissioned yet. So that's 122 00:14:27,880 --> 00:14:36,080 on the list of things to do with the public art group. Next slide. Waterworks pool. Again, 123 00:14:36,080 --> 00:14:42,400 this was opened and completed along with the concession stand shortly after. This has been 124 00:14:42,400 --> 00:14:48,200 an operations we did not open our pools this year because of COVID. But it's it's ready 125 00:14:48,200 --> 00:14:57,280 to open and for people to enjoy whenever we get post COVID for sure. Next slide. Bell 126 00:14:57,280 --> 00:15:04,840 athletic complex. This project is completed and being used. We are working on a few last 127 00:15:04,840 --> 00:15:10,640 minute additions to that we purchased some additional garbage cans, just park amenity 128 00:15:10,640 --> 00:15:16,240 items, and we're working on signage, we're going to put an arch, as you can see through 129 00:15:16,240 --> 00:15:20,080 the building, you see the playground down there in the bottom picture, there will be 130 00:15:20,080 --> 00:15:26,800 an arch there that says G Roland Vela athletic complex, and then we'll have a historical 131 00:15:26,800 --> 00:15:32,840 sign to let people know who, who Vela was or who Bella is, and what he did during his 132 00:15:32,840 --> 00:15:39,380 career, as well as a decorative plaque on the building, just commemorating the building 133 00:15:39,380 --> 00:15:46,180 itself when it was built and in those types of notifications. So we're putting some finishing 134 00:15:46,180 --> 00:15:54,320 touches on that project. We will have a balance in that project that balance not all of it, 135 00:15:54,320 --> 00:15:59,920 but some of it is bond committee money. We'll plan on coming back to you at the next meeting 136 00:15:59,920 --> 00:16:05,520 asking for that balance to be relocated to another project. Once everything is completed 137 00:16:05,520 --> 00:16:18,000 at Bella. Next slide. Lake Forest Park, Drew, Drew Huffman, our new assistant director actually, 138 00:16:18,000 --> 00:16:22,960 has been working diligently on this project has been challenging, working with the engineering 139 00:16:22,960 --> 00:16:30,160 on it, getting it ready for bid. The goal here is to dredge it and then to do some renovations 140 00:16:30,160 --> 00:16:35,480 on the dam itself, which is the area on the bottom left of your picture. We do have a 141 00:16:35,480 --> 00:16:41,520 trail that traverses on top of that, and then traverses throughout the entire park. The 142 00:16:41,520 --> 00:16:47,320 pond will be dredged. We do have a lot of vegetation that grows specifically in the 143 00:16:47,320 --> 00:16:52,760 heat of the summer on that northern section and starts to fill in the lake. And I'll let 144 00:16:52,760 --> 00:16:57,920 Drew provide some additional information on Lake Forest Park. This is Drew Huffman, assistant 145 00:16:57,920 --> 00:17:03,320 city director, Parks and Recreation. Like Gary said, we have been working very diligently 146 00:17:03,320 --> 00:17:10,120 on this project. We will receive the final plans tomorrow from the engineers. We'll review 147 00:17:10,120 --> 00:17:15,520 those final plans. Also with those plans will come all the specifications for us to be able 148 00:17:15,520 --> 00:17:22,220 to bid that project out. We are waiting on TCEQ and the Army Corps engineers permitting. 149 00:17:22,220 --> 00:17:26,200 It should be in, we expect those any day now. Those were all submitted back in March and 150 00:17:26,200 --> 00:17:33,280 they normally take around 90 days to 120 days to get them completed. So we're really close 151 00:17:33,280 --> 00:17:39,360 to those timelines. And we don't know exactly how COVID affected those two entities, but 152 00:17:39,360 --> 00:17:44,920 we were told that we were anticipating those permits any day. And as soon as we get those 153 00:17:44,920 --> 00:17:48,920 permits and all the plans are signed off, everything's ready to go for this to go to 154 00:17:48,920 --> 00:17:55,220 bid so we can start construction in the fall. 155 00:17:55,220 --> 00:18:02,080 Next slide. Open Space Land Acquisition. This is actually a 2019 bond program. The photo 156 00:18:02,080 --> 00:18:09,720 that's in the slide is the property on Mills. This was purchased in December of last year 157 00:18:09,720 --> 00:18:18,320 through funding from the Tree Fund. It was over $2 million. It's 70 acres, heavily treed 158 00:18:18,320 --> 00:18:27,400 on about 70% of it or so, 75% ish. Lots of, lots of post oaks on that property, a nice 159 00:18:27,400 --> 00:18:31,720 about four acre pond. Drew did go out there and make sure there were fish in there, just 160 00:18:31,720 --> 00:18:38,480 to kind of demo that. So we're looking forward to this being a future park space. As of right 161 00:18:38,480 --> 00:18:44,240 now, it is not open to the general public. There is an access road that you can see following. 162 00:18:44,240 --> 00:18:51,120 It's actually in the top right hand corner of your, the photo, I don't know if you can 163 00:18:51,120 --> 00:18:56,240 see my mouse or not, but it follows the tree line down the McKinney. It's a very narrow 164 00:18:56,240 --> 00:19:02,160 driveway. We probably, probably could use it as an alternate entrance or exit, but we're 165 00:19:02,160 --> 00:19:06,840 probably going to have to come off of Mills at some point in time. So we're looking to 166 00:19:06,840 --> 00:19:11,720 get this on our five year capital plan for master planning, and then we'll need funding 167 00:19:11,720 --> 00:19:17,360 for eventual park development at some point. This would be treated similar to Southwest 168 00:19:17,360 --> 00:19:24,400 Park. This one would be more in nature theme, where we're not going to go through and clear 169 00:19:24,400 --> 00:19:30,680 a tree. We're probably going to work around the trees, put in a lot of trails, the pond 170 00:19:30,680 --> 00:19:40,240 enjoyment for people, and just general outdoor experience. But we'll go through an entire 171 00:19:40,240 --> 00:19:44,880 design charrette with a focus group, as well as getting community meetings, getting input 172 00:19:44,880 --> 00:19:53,360 for what those neighbors that live out there, what they want to see in that park long term. 173 00:19:53,360 --> 00:20:03,400 Next slide. So that's, that's a brief overview on our bond related projects from 2014, 2015. 174 00:20:03,400 --> 00:20:06,680 Love to answer any questions you may have about any of those projects or even anything 175 00:20:06,680 --> 00:20:19,200 else within the park system. Tim? Yeah, I just had a question on timeframe for the completion 176 00:20:19,200 --> 00:20:27,960 of the tennis courts at the North Lakes. So we're not 100% sure yet until we get the 177 00:20:27,960 --> 00:20:34,240 bids back. You know, we were thinking it would be eight months or so, but really depends 178 00:20:34,240 --> 00:20:40,000 on on each contractor, what their timelines are. So we're we're thinking they'd be done 179 00:20:40,000 --> 00:20:47,240 somewhere between, you know, roughly by the end of 21. Okay, so you don't expect construction 180 00:20:47,240 --> 00:20:54,120 to start until early 21, sometime in early 21. That's that's that's ballpark. You know, 181 00:20:54,120 --> 00:21:00,480 if we go out to bid, let's say, just say August 1. It typically by time we go through the 182 00:21:00,480 --> 00:21:05,680 bidding process, the evaluation, get it to council, it's two to three months, and then 183 00:21:05,680 --> 00:21:11,440 we get the contract rolling, get them on site. So it probably be, you know, December, November, 184 00:21:11,440 --> 00:21:17,920 December, before we get them on board. So it could be late summer, early fall of 21. 185 00:21:17,920 --> 00:21:22,640 But we can get you definitely a more detailed timeline once we look at the bids that come 186 00:21:22,640 --> 00:21:28,560 in, in their timeframes. And you but you expect the building to be completed at the first 187 00:21:28,560 --> 00:21:33,240 of the year, but but there would be no occupancy or use of the building until the courts are 188 00:21:33,240 --> 00:21:38,400 complete. Is that right? That's correct. We may use it for staff in the meantime, while 189 00:21:38,400 --> 00:21:43,000 we're shuffling people around trying to keep people separated a little bit. But the building 190 00:21:43,000 --> 00:21:54,320 will be done ahead of the tennis courts. That is great. Okay, thank you. Are there any other 191 00:21:54,320 --> 00:22:03,520 questions from the committee members? Not I've got one on the Gary on the Southwest Park 192 00:22:03,520 --> 00:22:16,080 master plan and design. You talked about needing additional requesting an additional $75,000 193 00:22:16,080 --> 00:22:22,320 to finalize the project. Is that going to be on top of the original 100? Or is that 194 00:22:22,320 --> 00:22:28,880 the 75 that just hasn't been spent yet? So originally, I guess it was about a year or 195 00:22:28,880 --> 00:22:35,040 so ago, we asked the committee for $100,000 to be reallocated from Southwest Park to the 196 00:22:35,040 --> 00:22:40,840 Parks and Recreation Trail System master plan. We've used about 25,000 of that that was being 197 00:22:40,840 --> 00:22:47,000 done in house. We did hire some consultants to provide some minimal input on various items 198 00:22:47,000 --> 00:22:53,080 throughout the park system that utilize some of that 25,000. We were doing that internally 199 00:22:53,080 --> 00:23:00,480 with staff between balance of our existing work. And that it took a lot of time, we had 200 00:23:00,480 --> 00:23:07,700 30 public 3035 public meetings. And we've been working on it slowly. That staff member 201 00:23:07,700 --> 00:23:14,480 left the organization in February, then COVID hit. We have been working on the plan, specifically 202 00:23:14,480 --> 00:23:20,240 the trail section of the master plan with UNT during this timeframe. And we're looking 203 00:23:20,240 --> 00:23:27,940 to have that public meeting in August. We had a pre bid meeting with consultants yesterday 204 00:23:27,940 --> 00:23:34,560 to talk about the master plan. Their their bids are due at the first week of August. 205 00:23:34,560 --> 00:23:41,800 At that point in time, we'll go through interview the top three or four companies. And then 206 00:23:41,800 --> 00:23:46,280 once we select one, we'll negotiate pricing. At that point in time, I know exactly what's 207 00:23:46,280 --> 00:23:52,680 going to cost to finish that for us. So we may not need all of that. I hope we don't. 208 00:23:52,680 --> 00:24:00,680 But just because of timing with you guys meeting before we had that number, I asked for $75,000. 209 00:24:00,680 --> 00:24:04,800 We definitely provide an update to you at the next meeting in regards to what that contract 210 00:24:04,800 --> 00:24:08,400 amount is. And then if we need to bring some of that money back, we could definitely do 211 00:24:08,400 --> 00:24:16,120 that. We're not going to spend it if we don't need it for that project. We don't think with 212 00:24:16,120 --> 00:24:22,160 the scope of the work for the Southwest Park master plan that we need $1.2 million, that 213 00:24:22,160 --> 00:24:28,240 is not going to be enough to do this the construction drawings for that park. We do not have funding 214 00:24:28,240 --> 00:24:34,160 for it. We could possibly use some of that money for a phase section of that park. But 215 00:24:34,160 --> 00:24:39,120 until we get that park entirely master plan, I can't tell you exactly what phases will 216 00:24:39,120 --> 00:24:53,360 be first and what estimated cost would be. Okay. I just had one other question too on 217 00:24:53,360 --> 00:25:03,200 the veil of soccer complex and the monuments, sculptures that are going to be constructed 218 00:25:03,200 --> 00:25:09,640 out there. I was looking in the narrative and it was talking about where some of the 219 00:25:09,640 --> 00:25:18,040 different funding was coming from for those projects. So my question was going to be in 220 00:25:18,040 --> 00:25:26,000 line with had the public art committee identified, have they already identified where they're 221 00:25:26,000 --> 00:25:37,840 going to spend their remaining funds from the bond, I believe the 2014 bond. And I know 222 00:25:37,840 --> 00:25:43,000 that we had noticed, I don't know, maybe 10 to 15 different projects they were going to 223 00:25:43,000 --> 00:25:50,960 spend that money on at different places. Can we, if they've already identified that money, 224 00:25:50,960 --> 00:25:57,480 that's one thing. But if they haven't, does it make sense to fund the sculptures out of 225 00:25:57,480 --> 00:26:06,560 the public art committee funds and keep park funds out of that? 226 00:26:06,560 --> 00:26:13,240 So if I'm understanding correctly, if we could use the park funds first on that project and 227 00:26:13,240 --> 00:26:19,680 then let the public art committee use that money for another project, is that what you're 228 00:26:19,680 --> 00:26:28,240 talking about? Exactly the opposite. Okay. Okay. So as of right now, the sculpture portion 229 00:26:28,240 --> 00:26:36,240 of Vela is being paid for by the public art committee. I believe they have some of that 230 00:26:36,240 --> 00:26:41,320 allocated from bonds and then some money from hot funds that we're going to go towards that 231 00:26:41,320 --> 00:26:49,640 sculpture at Vela. If you scroll back to your picture of the park where you kind of have 232 00:26:49,640 --> 00:26:56,240 that alley that goes between the two buildings, there is a cube right there right now, a foundation 233 00:26:56,240 --> 00:27:01,880 that wasn't solved, that's ready for the public art to be placed. The subcommittee from the 234 00:27:01,880 --> 00:27:05,800 public art committee is going through and identifying the artists that they're going 235 00:27:05,800 --> 00:27:14,880 to be interviewing to do that sculpture. But as of right now, all the art is coming from 236 00:27:14,880 --> 00:27:22,760 the public art group. If the cost was higher than the, I think they have $35,000 allocated 237 00:27:22,760 --> 00:27:29,280 towards that based on the thematic approach that they're providing for that direction 238 00:27:29,280 --> 00:27:36,800 of that sculpture idea, it may cost more than 35. We could consider using some of the Vela 239 00:27:36,800 --> 00:27:44,000 money to assist that if it's going to be more, or they could use some of their other allocated 240 00:27:44,000 --> 00:27:46,160 bond money for artwork. 241 00:27:46,160 --> 00:27:52,000 Okay, that makes sense. Thank you for clarifying that. 242 00:27:52,000 --> 00:27:53,600 You're welcome. 243 00:27:53,600 --> 00:27:59,200 Are there any more questions from the subcommittee before we move on? I'm not the subcommittee 244 00:27:59,200 --> 00:28:02,400 of the committee. Okay. 245 00:28:02,400 --> 00:28:15,600 Great, I will hand it over to Todd Essence to go over a capital projects presentation. 246 00:28:15,600 --> 00:28:19,440 While Todd's coming up, the majority of the presentation that Todd's going to go over 247 00:28:19,440 --> 00:28:25,480 was presented to council a couple of weeks ago, just as a capital projects update to 248 00:28:25,480 --> 00:28:30,760 council as well. And so give that update to them and obviously wanted to come back and 249 00:28:30,760 --> 00:28:34,600 give a very similar update to the committee. And that's going to be something we'll be 250 00:28:34,600 --> 00:28:40,600 updating council on moving forward on a regular basis. I think we'll start off on a monthly 251 00:28:40,600 --> 00:28:44,120 basis going back to council with these updates and obviously bringing them to the committee 252 00:28:44,120 --> 00:29:02,440 every time we meet. Like you're on mute, Todd. If that had happened five times a week, it 253 00:29:02,440 --> 00:29:06,800 wouldn't be often enough to capture how many times it happens to me. So I apologize for 254 00:29:06,800 --> 00:29:10,840 running a little bit late this morning. It's appropriate that we're talking about roads 255 00:29:10,840 --> 00:29:15,700 when I had a car that didn't want to get on one this morning. So here we go. As David 256 00:29:15,700 --> 00:29:20,440 said, we did present the vast majority of this presentation to council here recently 257 00:29:20,440 --> 00:29:25,800 as an update. We are going to council on a monthly basis to update them on the status 258 00:29:25,800 --> 00:29:33,160 of projects. So as we run through this quickly, we just want to start with the 2012 and 2014 259 00:29:33,160 --> 00:29:38,640 bond program. And just to remind some of us, most of us are intimately aware of this one 260 00:29:38,640 --> 00:29:43,800 that in the 2012 bond election, it was primarily a streets bond. You had a little bit of public 261 00:29:43,800 --> 00:29:49,400 art component, but it's $20 million towards roadway or street reconstruction. And then 262 00:29:49,400 --> 00:29:55,820 2014, you've got this list of both in proposition one streets, which a large portion of that, 263 00:29:55,820 --> 00:30:01,280 another 20 to $24 million was street reconstruction. And then you had a myriad of items that were 264 00:30:01,280 --> 00:30:07,240 transportation related, broken out. And then in proposition three, did quite a few drainage 265 00:30:07,240 --> 00:30:14,880 improvements that were also included in that bond. So just to give you a snapshot of where 266 00:30:14,880 --> 00:30:20,360 we are with the 2012 bond program currently, and you'll see these colors pretty thematically 267 00:30:20,360 --> 00:30:24,000 throughout the presentation that blue, that kind of light blue color is always going to 268 00:30:24,000 --> 00:30:30,560 be projects in design, orange construction, pretty obviously. And then if it's completed, 269 00:30:30,560 --> 00:30:34,960 we've grayed it out. We're using the other colors of the rainbow for other things. And 270 00:30:34,960 --> 00:30:41,720 we'll talk about that here shortly. So currently we have about 30 segments to that to the 208 271 00:30:41,720 --> 00:30:46,580 segments that was originally in the 2012 bond program. We have about 30 left in design. 272 00:30:46,580 --> 00:30:52,440 They're being designed currently. We have 31 in construction and 147 complete. And we'll 273 00:30:52,440 --> 00:30:58,660 talk about why that design component is really important here in just a few minutes. The 274 00:30:58,660 --> 00:31:04,400 2014 bond program, you had another 195 segments that were added to the overall street reconstruction 275 00:31:04,400 --> 00:31:11,040 program. We've completed 119. You have 18 that are actively in construction, another 276 00:31:11,040 --> 00:31:15,640 49 in design. And at the time this presentation was put together, we had nine in the bid and 277 00:31:15,640 --> 00:31:24,400 award phase that has since been bid and it's going through the award process. And then 278 00:31:24,400 --> 00:31:30,640 in 2018, we issued CEOs that did two things. It attempted to round out what we understood 279 00:31:30,640 --> 00:31:37,640 the cost to deliver the 2012 and 2014 bond program, the street reconstruction segments. 280 00:31:37,640 --> 00:31:44,160 That's that 4.5 million. At the time, that was our best estimate of what it would cost. 281 00:31:44,160 --> 00:31:49,560 We've talked as a group multiple times about how we're seeing construction inflation, cost 282 00:31:49,560 --> 00:31:54,120 of construction inflation ramping up about 1% per month. And we have not seen that slow 283 00:31:54,120 --> 00:31:59,800 down even through the current economic scenario. It's still paying out to be true. Now we are 284 00:31:59,800 --> 00:32:04,680 starting to see that erode just a little bit as we see some more current projects come 285 00:32:04,680 --> 00:32:09,720 to bid and they're coming in significantly under what we anticipated, but it's still 286 00:32:09,720 --> 00:32:17,200 holding fairly true. And then we added as part of that 2018 CO issuance, we added another 287 00:32:17,200 --> 00:32:24,400 37 segments. Now if you recall, part of that effort was to recognize that in 2012 and 2014, 288 00:32:24,400 --> 00:32:30,520 the focus was on roadways that had OCI's or overall condition index assessment scores 289 00:32:30,520 --> 00:32:37,960 of 40 or less. So you had a lot of segments. Over the summer last year when we were talking 290 00:32:37,960 --> 00:32:42,360 about the 2019 bond, we were talking about that shotgun approach. It was, I don't care 291 00:32:42,360 --> 00:32:46,680 where it is in town. If it's a low on the OCI, we'll go fix it. Well, that left a lot 292 00:32:46,680 --> 00:32:52,200 of segments that were just on the borderline in between segments. It left them undone. 293 00:32:52,200 --> 00:32:56,560 So then we're coming back in successive years and impacting that neighborhood over and over 294 00:32:56,560 --> 00:33:02,600 again. It also was a very myopic view of what's actually in the right away as it was really 295 00:33:02,600 --> 00:33:07,680 focused on street segments without concern or consideration of what's going on with water 296 00:33:07,680 --> 00:33:12,080 and wastewater and some other facets in the infrastructure that we need to make sure we 297 00:33:12,080 --> 00:33:18,480 took into account holistically. So we added another 6.5 million in that 2018 CO issuance 298 00:33:18,480 --> 00:33:22,760 to make sure that we could help get a little further along away from that shotgun approach 299 00:33:22,760 --> 00:33:31,000 and more into that more neighborhood centric approach and get these projects done holistically. 300 00:33:31,000 --> 00:33:36,080 And then just briefly, the 2019 bond program as part of the street reconstruction component, 301 00:33:36,080 --> 00:33:41,120 there was another $70 million authorized by the voters to go ahead and go forward with 302 00:33:41,120 --> 00:33:46,520 street reconstruction. At the time that we were planning, that was 376 segments. We're 303 00:33:46,520 --> 00:33:51,760 still looking at that neighborhood focused approach. But we've also over the last year 304 00:33:51,760 --> 00:33:57,640 been working through a couple of issues, mostly tying in the water and wastewater component, 305 00:33:57,640 --> 00:34:03,760 make sure that we deliver all of those items cohesively and holistically. And that's also 306 00:34:03,760 --> 00:34:07,760 been an issue as we worked through, okay, what does that delivery schedule look like? 307 00:34:07,760 --> 00:34:11,520 And then you throw COVID on top of this and we're struggling to figure out what are we 308 00:34:11,520 --> 00:34:16,440 doing here? And that did put a little bit of a dynamic in this that we had not anticipated. 309 00:34:16,440 --> 00:34:23,040 So we anticipate the next time that this committee meets that we'll have a program, programmatic 310 00:34:23,040 --> 00:34:27,840 plan set out to set for you side to side for you so that you can see how we're actually 311 00:34:27,840 --> 00:34:36,400 going to deliver that 2019 program. One of the things that we did talk to council 312 00:34:36,400 --> 00:34:41,960 about were those cost overruns. And this is that design component of 2012 and 2014, along 313 00:34:41,960 --> 00:34:46,040 with several other factors that we wanted to bring to your attention. We did go back 314 00:34:46,040 --> 00:34:52,280 to council and asked for an additional CO issuance of 8.9 million to complete the 2012 315 00:34:52,280 --> 00:34:58,880 and 2014 bond program. There were a lot of contributing factors to that. And I'm going 316 00:34:58,880 --> 00:35:04,040 to flip to the next slide. We can come back to this later if you have questions. But one 317 00:35:04,040 --> 00:35:09,380 of those drivers, those prime drivers that we ran into was a lot of these street segments 318 00:35:09,380 --> 00:35:14,480 were anticipated to be done through in-house crews or contracts that we already had. And 319 00:35:14,480 --> 00:35:21,520 that pricing was used to develop what we thought we were going to have to have on hand in 2018. 320 00:35:21,520 --> 00:35:27,800 What we saw significantly in 2019 was absolutely there was a lot of variable left in these 321 00:35:27,800 --> 00:35:32,760 projects. And as we had to bid them, not through the traditional contracts that we had used 322 00:35:32,760 --> 00:35:39,280 10, 20, 30 years in the past, but we're up to speed. We're getting these contracts as 323 00:35:39,280 --> 00:35:44,760 they're appropriately as it meets all the requirements of our procurement department 324 00:35:44,760 --> 00:35:52,560 in the state law. We definitely saw some impacts to pricing. Now that was lack of some details 325 00:35:52,560 --> 00:35:57,160 that could have been in those bid packages. And that's absolutely where the design helps 326 00:35:57,160 --> 00:36:02,920 that component. So not incorporating design into earlier bid packages absolutely impacted 327 00:36:02,920 --> 00:36:08,240 where we went last year. That pushed some schedules out. We're currently not anticipating 328 00:36:08,240 --> 00:36:14,200 2012 and 2014 being fully complete until the end of 2022, very beginning of 2023 at the 329 00:36:14,200 --> 00:36:22,680 latest. We also had significant increases in variety of sectors in the market. Plus 330 00:36:22,680 --> 00:36:27,320 the competition for labor in the construction market's been unreal over the last four or 331 00:36:27,320 --> 00:36:32,880 five years. That has definitely led to labor costs going up and overall pricing to go up. 332 00:36:32,880 --> 00:36:38,440 So that's just a snapshot of what occurred between 2018 when we thought we had it fully 333 00:36:38,440 --> 00:36:46,400 budgeted and where we are today. So over time, initially we started with 208 street segments 334 00:36:46,400 --> 00:36:52,280 in the 2012 bond election. That when 2014 came along, it brought us back to 403. And 335 00:36:52,280 --> 00:36:57,140 today we're currently working through that 440 segments. Before I move on to the rest 336 00:36:57,140 --> 00:37:03,080 of these projects, are there any questions that the committee would like to address at 337 00:37:03,080 --> 00:37:10,760 this point? Todd, you'll need to take down the slide there. I think we under the open 338 00:37:10,760 --> 00:37:18,560 meetings act, we have to show whoever is talking to us. Okay. Are there any questions from 339 00:37:18,560 --> 00:37:35,560 the committee? Sure. Go for it, Todd. All right. All right. So we move forward to more 340 00:37:35,560 --> 00:37:40,760 individualized projects and especially related to the bond program. One of the things you're 341 00:37:40,760 --> 00:37:47,120 going to see as a theme on the subsequent slides and in future presentations is a snapshot 342 00:37:47,120 --> 00:37:52,520 of where we are with these projects. So just to kind of lay out the map for you just a 343 00:37:52,520 --> 00:37:59,160 little bit here, you're going to see again that blue is always going to represent the 344 00:37:59,160 --> 00:38:03,320 projects that are under design. If it's in orange, then it's in construction. Now, one 345 00:38:03,320 --> 00:38:06,520 of the things you'll see here is obviously we've got a schedule here at the top that 346 00:38:06,520 --> 00:38:14,160 refers to the years. So while we may be in design, say in May of a year, we're going 347 00:38:14,160 --> 00:38:18,080 to go to construction that same year. So the whole year shows up as construction. It doesn't 348 00:38:18,080 --> 00:38:23,120 necessarily mean we, it's not an intent to nail down timeframes here. It's just to give 349 00:38:23,120 --> 00:38:27,320 you an idea that within that year, that's what's going to happen. Absolutely. We have 350 00:38:27,320 --> 00:38:32,360 those schedules, but this is just for representation purposes. It gives you a better idea of where 351 00:38:32,360 --> 00:38:38,000 we are. If you see a project in purple, it's on hold for construction or maybe on hold 352 00:38:38,000 --> 00:38:41,800 for design. There may be a variety of reasons for that and we can talk through those issues 353 00:38:41,800 --> 00:38:47,160 as we come upon them. This dash blue line right down the middle here, that's just to 354 00:38:47,160 --> 00:38:51,680 give you a frame of reference of where we are in time. So where we are throughout that 355 00:38:51,680 --> 00:38:57,280 year and where that is in relation to the project and its delivery. On the far left, 356 00:38:57,280 --> 00:39:02,040 you'll see the project name, the proposition it was under, as well as here, scope, schedule 357 00:39:02,040 --> 00:39:06,160 and budget, the three legs of the stool for any project. We understand their health of 358 00:39:06,160 --> 00:39:12,960 that project by where we are within those three spectrums. So scope, if you see scope, 359 00:39:12,960 --> 00:39:17,540 schedule or budget with a green dot, that means things are moving forward as expected. 360 00:39:17,540 --> 00:39:22,160 We have no real major issues that we're working through, nothing that would seem to be impacting 361 00:39:22,160 --> 00:39:26,720 either scope, schedule or budget, wherever that lands. If you see it in yellow, that 362 00:39:26,720 --> 00:39:32,040 means there is a risk or an opportunity that staff is working through to resolve. It may 363 00:39:32,040 --> 00:39:35,760 have an impact to the project. It may not. It may just be something that we're working 364 00:39:35,760 --> 00:39:41,400 through embedding, but as quickly as we identify those moving into that yellow category, we 365 00:39:41,400 --> 00:39:44,640 want to bring them to everybody's attention so that you're aware we're working through 366 00:39:44,640 --> 00:39:49,400 those issues, but we haven't fully resolved them just yet. And then anything that shows 367 00:39:49,400 --> 00:39:55,000 up in red, that is a definitive impact. It only goes back to green once we have a full 368 00:39:55,000 --> 00:39:58,600 resolution of that issue. So some of what you're seeing here is the presentation that 369 00:39:58,600 --> 00:40:03,040 we gave to council. There have been a few minor updates, but this is what we presented 370 00:40:03,040 --> 00:40:07,800 to council at the end of June. So just walking through here, and I don't want to go through 371 00:40:07,800 --> 00:40:12,680 every project because if it's in green, then we're proceeding forward as you see here. 372 00:40:12,680 --> 00:40:16,120 This is the schedule that we anticipate and we're not seeing any major issues at this 373 00:40:16,120 --> 00:40:20,800 time. But if you look at the first two, the Quiet Zones projects, there has been some 374 00:40:20,800 --> 00:40:27,280 motion on those here recently. We are about 95% to 100%, depending on the intersection, 375 00:40:27,280 --> 00:40:32,560 complete on design. We're working through the logistics of getting those to construction. 376 00:40:32,560 --> 00:40:38,480 We are waiting on one crossing for UP's approval. And to date, we just have one document that 377 00:40:38,480 --> 00:40:43,680 we're waiting on, which is the update of pricing that they had given to us initially. So as 378 00:40:43,680 --> 00:40:48,520 soon as that moves through the system, we anticipate that to move here in the next 30 379 00:40:48,520 --> 00:40:53,160 days to 45 days. We're working hand in hand with council governments to keep moving in 380 00:40:53,160 --> 00:41:00,080 that conversation with UP and move those four projects along much faster and those four 381 00:41:00,080 --> 00:41:05,160 intersections in that project. There are also in that Quiet Zone package three more projects 382 00:41:05,160 --> 00:41:10,440 that are much further north. We're not pushing those forward as quickly right now, primarily 383 00:41:10,440 --> 00:41:14,960 because we really need to get the middle segment, which is everything from McKinney Street all 384 00:41:14,960 --> 00:41:19,720 the way up to Old North. Those crossings also need to be done before anything's really effective 385 00:41:19,720 --> 00:41:24,900 the further north you get. So we're working through those, but for sure the downtown crossings 386 00:41:24,900 --> 00:41:30,160 and Quiet Zones, that's what we are anticipating to see motion on that project here shortly. 387 00:41:30,160 --> 00:41:33,720 So the next time you see this update, we should have a schedule up there and we'll give you 388 00:41:33,720 --> 00:41:40,520 an idea of where we are on the delivery of it. If I'm looking through these different 389 00:41:40,520 --> 00:41:46,720 projects, I'm going to jump down to the 2020 street bundle. You'll see yellow here. My 390 00:41:46,720 --> 00:41:53,840 apologies. Trying to get rid of a screen that's popped up all of a sudden. That yellow dot 391 00:41:53,840 --> 00:42:00,320 there under schedule is really from a change in an effort to minimize costs. That 2020 392 00:42:00,320 --> 00:42:04,400 street bundle, we were going to send out to design through a consultant contract. That 393 00:42:04,400 --> 00:42:09,240 contract was on the order of two to two and a half million dollars, which was within the 394 00:42:09,240 --> 00:42:14,000 range you would expect for a project that's a 20 to $22 million construction project. 395 00:42:14,000 --> 00:42:21,120 But in an order to save some money and allow some of this money to be pushed to other projects, 396 00:42:21,120 --> 00:42:26,360 especially other street reconstruction projects, we brought this design in house. Now the trade 397 00:42:26,360 --> 00:42:31,520 off with design in house is the cost does come down substantially, about half or less 398 00:42:31,520 --> 00:42:37,240 the cost of what we would send outsourced. But there's a time trade off. We definitely 399 00:42:37,240 --> 00:42:42,960 don't have 50 or 60 engineers waiting to just jump on a design project and get all into 400 00:42:42,960 --> 00:42:49,160 the weeds with it. We have two engineers and four design technicians and it just elongates 401 00:42:49,160 --> 00:42:54,520 the time frame for that design to be completed. So the risk here, why you see it in yellow, 402 00:42:54,520 --> 00:43:01,280 is really driven by the timeline. So it may take us a little longer to design these projects 403 00:43:01,280 --> 00:43:06,200 so that could have some construction cost impacts, but we're working to minimize that 404 00:43:06,200 --> 00:43:11,640 through some other measures. So that's an effort in progress. One of the things I didn't 405 00:43:11,640 --> 00:43:16,240 mention earlier is if you see on the far left here, some of these rows are highlighted in 406 00:43:16,240 --> 00:43:21,200 either orange or a green. Green would mean that it's complete and you'll see that on 407 00:43:21,200 --> 00:43:27,080 a couple of slides here. Orange means we're bidding that project, that project is bid. 408 00:43:27,080 --> 00:43:31,800 This project at the time we went to council was being bid. It has already come in. It's 409 00:43:31,800 --> 00:43:39,400 going to council for award. Next project on this list was Hickory Creek Road phase two. 410 00:43:39,400 --> 00:43:44,440 We do have some budget concerns there. It's more nailing down costs for some unforeseen 411 00:43:44,440 --> 00:43:49,360 utility issues that occurred out in the field once we started construction and then closing 412 00:43:49,360 --> 00:43:57,400 the budget costs for the signal that will go in at Montecito and Hickory Creek Road. 413 00:43:57,400 --> 00:44:04,440 Morse Street is, and there's an item later on in the agenda to talk about Morse, we started 414 00:44:04,440 --> 00:44:08,680 looking at what projects had the highest priority needs to make sure they can continue to go 415 00:44:08,680 --> 00:44:13,840 forward. And obviously West Hickory had the greatest need to really get pushed forward, 416 00:44:13,840 --> 00:44:20,200 but it had some budget constraints. As streetlights were added, as sidewalks were added, then 417 00:44:20,200 --> 00:44:24,920 the drainage component once we got into design, that also needed to be done. That increased 418 00:44:24,920 --> 00:44:30,080 the cost of that project to almost 2.9 million up from what we originally thought of almost 419 00:44:30,080 --> 00:44:36,840 a million dollar project. The thought process here was let's take a look at Morse. Morse 420 00:44:36,840 --> 00:44:42,980 really doesn't have a need to expand as quickly. Now that has changed some and we are working 421 00:44:42,980 --> 00:44:47,960 with the county on that one as they've taken over the former Sallie Beauty building. But 422 00:44:47,960 --> 00:44:53,160 the street itself is actually in usable condition. It still needs to be done. The project is 423 00:44:53,160 --> 00:44:56,900 definitely not off of our radar. We're still pushing forward. We're just looking for avenues 424 00:44:56,900 --> 00:45:01,280 to fund that project. So that's why you see it on hold on the far right. You also see 425 00:45:01,280 --> 00:45:06,080 the schedule and the budget in red. That project is on hold until we nail down where those 426 00:45:06,080 --> 00:45:11,920 funds are coming from to finish out that project. That project also grew from just what was 427 00:45:11,920 --> 00:45:19,720 in the bond program to extending the old two lanes of Morse Street, which is still asphalt, 428 00:45:19,720 --> 00:45:25,160 and redoing the entire stretch from 288 all the way over to Mayhill. So that's some more 429 00:45:25,160 --> 00:45:30,040 of the issues came from as well from a budget side. So we're working through that issue 430 00:45:30,040 --> 00:45:34,160 and we'll have an update soon or the next time this committee meets for sure we'll have 431 00:45:34,160 --> 00:45:40,640 that path forward. And then the Riddell extension at Mingo, if you recall, a couple years ago 432 00:45:40,640 --> 00:45:47,600 we talked about really where we need to focus that money is the design efforts into Mingo 433 00:45:47,600 --> 00:45:52,160 Road as a whole from Bell all the way up to Old North, including Riddell. And then let's 434 00:45:52,160 --> 00:45:57,120 figure out what does that intersection look like at Riddell and Mingo. So the area the 435 00:45:57,120 --> 00:46:02,400 traffic study for the entire area is complete. We're working through the draft comments right 436 00:46:02,400 --> 00:46:07,480 now and finalizing that that will lead into the design phase. So right now we're nailing 437 00:46:07,480 --> 00:46:12,080 down scope as we work through this and we'll be able to give you a better idea where we 438 00:46:12,080 --> 00:46:19,840 recommend that project going and then we can put a schedule to it going forward from there. 439 00:46:19,840 --> 00:46:23,800 Following and if you have this presentation, your backup, you'll see a lot of things we 440 00:46:23,800 --> 00:46:29,280 just talked about on the following page that was just for your reference and we can absolutely 441 00:46:29,280 --> 00:46:34,560 come back to this here in a minute. As we move into proposition three, so we broke this 442 00:46:34,560 --> 00:46:39,000 out a little bit. This is still part of the 2014 bond program. These are those drainage 443 00:46:39,000 --> 00:46:45,080 projects that were in the bond program. You see two of the green. Those projects are complete. 444 00:46:45,080 --> 00:46:51,120 Then you have two up here. Phase one of that downtown storm sewer trunk line. That project 445 00:46:51,120 --> 00:46:56,320 is bidding and we'll be going out to construction this year. It's still on target in all phases. 446 00:46:56,320 --> 00:47:00,640 It's green across, but you've got this phase two where we're running into an issue working 447 00:47:00,640 --> 00:47:06,240 with UP that we do anticipate being resolved here very shortly. Now that we've got council 448 00:47:06,240 --> 00:47:11,980 of governments helping us work through this issue with UP, there's an easement that was 449 00:47:11,980 --> 00:47:17,240 needed to get into that project, get into the railroad right away to be able to put 450 00:47:17,240 --> 00:47:21,320 that project into the ground. There's also a couple of driveways that have to be moved. 451 00:47:21,320 --> 00:47:24,920 We're working through some of the budget constraints that we're dealing with now as we've worked 452 00:47:24,920 --> 00:47:35,440 through the time lag on this. Before I move on to the 2019 bond program, are there any 453 00:47:35,440 --> 00:47:40,680 questions that I can answer at this point? Eric? 454 00:47:40,680 --> 00:47:50,960 Hey Todd. Just a couple quick things. When you talk about Riddell looking at that as 455 00:47:50,960 --> 00:47:58,080 a holistic project, but then you also talked about the quiet zone progress that we've made, 456 00:47:58,080 --> 00:48:04,240 so thank you for that with UP and the cog. I'm assuming, but I'd like to confirm just 457 00:48:04,240 --> 00:48:11,040 that the crossings near Riddell that might be changed as a factor of, or as a result 458 00:48:11,040 --> 00:48:17,580 of the Riddell project would be kind of pushed back on those plans from a funding perspective. 459 00:48:17,580 --> 00:48:22,440 That plan set, having the benefit of us being able to plan this on our own this time, this 460 00:48:22,440 --> 00:48:26,320 is one of the few projects where we've really gotten to stretch our own wings on this. Yes, 461 00:48:26,320 --> 00:48:31,320 the quiet zones would be incorporated into the project. As we work through the design, 462 00:48:31,320 --> 00:48:34,640 we would be working with the railroad to make that happen as well. 463 00:48:34,640 --> 00:48:56,160 Okay. Thank you. Any more questions? Okay. All right, 2019 bond program. So the 2019 464 00:48:56,160 --> 00:49:00,800 bond program, there were three propositions. The one I'm going to focus on is proposition 465 00:49:00,800 --> 00:49:06,800 one, which is the roadways component. Similar to what we've seen earlier, you see the street 466 00:49:06,800 --> 00:49:10,880 reconstruction programs, primarily in purple. The only reason that's in purple right now 467 00:49:10,880 --> 00:49:14,960 is that we're working through that programming piece. So we do anticipate that by the end 468 00:49:14,960 --> 00:49:17,860 of the summer, we'll know what that program looks like, and we'll be able to give you 469 00:49:17,860 --> 00:49:22,560 a schedule. We'll also be able to clear out the yellows and give you an idea of where 470 00:49:22,560 --> 00:49:28,960 that project lands. Sidewalk improvements, schedule and budget. One of the things that 471 00:49:28,960 --> 00:49:35,360 really could be changed is this 2020 block. Since the last time we talked to council, 472 00:49:35,360 --> 00:49:39,400 we have two years worth of construction already designed. So that money's already being put 473 00:49:39,400 --> 00:49:46,360 to work to build sidewalks that were designed in 2018 and 2019. So those are moving forward. 474 00:49:46,360 --> 00:49:50,660 The schedule and the budget constraints, those are really just as we work through the right 475 00:49:50,660 --> 00:49:56,440 away issues. The biggest unknown for any of these sidewalk projects is that temporary 476 00:49:56,440 --> 00:50:01,480 construction easements, as you work with individual property owners and you start working through 477 00:50:01,480 --> 00:50:05,080 what it actually costs to acquire right away where you didn't have it before or you're 478 00:50:05,080 --> 00:50:11,200 working around landscaping or a variety of other things that are out there, it can make 479 00:50:11,200 --> 00:50:15,440 that cost and schedule go up a little bit. It can also contract it depending on who you're 480 00:50:15,440 --> 00:50:18,880 working with. So that's why you see those in yellows. We're working through every one 481 00:50:18,880 --> 00:50:23,780 of those issues as they come up. The Bonnie Bray phase five, you'll see the yellow there 482 00:50:23,780 --> 00:50:28,960 for schedule and budget. That really comes down to the fact that we were looking to reduce 483 00:50:28,960 --> 00:50:33,680 some of the cost incurred by that project by bringing in the design in-house. So instead 484 00:50:33,680 --> 00:50:37,400 of going out and getting another million, a million and a half dollar contract to design 485 00:50:37,400 --> 00:50:42,200 that project, we're designing that one in-house that can have similar trade-offs as we talked 486 00:50:42,200 --> 00:50:47,160 about earlier where because we're designing in-house, there's a limited amount of staff 487 00:50:47,160 --> 00:50:51,000 that can push the schedule out, but we are working to minimize that impact as well. So 488 00:50:51,000 --> 00:50:56,780 we do anticipate overall the budget should stay much leaner on the design side. Now right 489 00:50:56,780 --> 00:51:04,480 away in construction costs, that'll be the number that we're working through. And I think 490 00:51:04,480 --> 00:51:12,000 that is it. Yes. Any questions? 491 00:51:12,000 --> 00:51:16,360 I would add just one thing to Todd's presentation there at the end as we talked about the street 492 00:51:16,360 --> 00:51:21,840 reconstruction program for 2019. And this was indicated in the backup as well. As we're 493 00:51:21,840 --> 00:51:26,920 focusing on closing out the 2012 and 2014 program and issuing that additional eight 494 00:51:26,920 --> 00:51:32,120 to nine million dollars of CO debt next year to close those programs, we are focused now 495 00:51:32,120 --> 00:51:37,400 on design at least for the next two years for the 2019 program. And if you look at the 496 00:51:37,400 --> 00:51:42,140 issuance schedule we have, we have pushed out the issuance one year to extend a year 497 00:51:42,140 --> 00:51:47,080 to the 2019 program from what we considered during the committee process just as we focus 498 00:51:47,080 --> 00:51:51,320 on 12 and 14. But as Todd indicated, we'll be coming back to the committee with more 499 00:51:51,320 --> 00:51:55,920 detailed schedules for each of those. But I did want to make sure that was clear in 500 00:51:55,920 --> 00:52:00,520 the information that was presented. 501 00:52:00,520 --> 00:52:10,200 All right. Thank you very much. I appreciate your time. 502 00:52:10,200 --> 00:52:15,600 Now we have Scott Gray, our director of facilities to go over our facilities projects including 503 00:52:15,600 --> 00:52:22,000 the police police projects for the 2019 bond program. So Scott, we can take it away. Kevin 504 00:52:22,000 --> 00:52:24,880 Ann will pull up the presentation. 505 00:52:24,880 --> 00:52:30,540 Thank you, David. And good afternoon, everyone. I am, as David said, the new director of facilities 506 00:52:30,540 --> 00:52:36,840 management have been in the position since just about COVID hit in middle of March. So 507 00:52:36,840 --> 00:52:43,120 I'll do my best to fill in some of the blanks for you today on a couple of projects. The 508 00:52:43,120 --> 00:52:48,480 presentation you just saw by Todd's explanation of the color coding is the same thing I used 509 00:52:48,480 --> 00:52:53,400 in my presentation. So it saves me some time having to explain that. So, Kevin Ann, you 510 00:52:53,400 --> 00:52:59,120 can move to the next slide. Again, we're going to do a presentation on the two bond projects 511 00:52:59,120 --> 00:53:07,680 that are in '14 and '19 for you today. So the first project under the 2014 bond proposition 512 00:53:07,680 --> 00:53:12,560 number two is fire station number three. And again, the same color coding at the top of 513 00:53:12,560 --> 00:53:17,960 the slide there of where we're at and the vertical line of where we're at as well. So 514 00:53:17,960 --> 00:53:22,320 just wanted a couple of things. First of all, the picture on the right-hand side is the 515 00:53:22,320 --> 00:53:27,920 existing facility. And the one on the bottom there is the architectural rendering that 516 00:53:27,920 --> 00:53:33,040 was provided by Kirkpatrick architectural studios of what the new one will look like. 517 00:53:33,040 --> 00:53:38,760 This project is currently in construction. It was awarded to behavior contractors for 518 00:53:38,760 --> 00:53:45,840 the amount of approximately $6.3 million. That construction began in May of 2019. And 519 00:53:45,840 --> 00:53:51,600 as you see by the red dot under schedule, we are behind in the schedule primarily due 520 00:53:51,600 --> 00:53:59,660 to weather delays, extensive amount of rain in the last six months or so that has caused 521 00:53:59,660 --> 00:54:05,000 some delays. There's been a couple of construction related issues as well. It was originally 522 00:54:05,000 --> 00:54:11,400 proposed to be completed in April of this year. It is now looking like it will be October 523 00:54:11,400 --> 00:54:18,960 of this year for that completion of the new building. There's a second phase of this project, 524 00:54:18,960 --> 00:54:23,500 which is actually the demolition of the old station, which will happen just after the 525 00:54:23,500 --> 00:54:28,720 new station opens. That'll include the demolition and then some various landscaping related 526 00:54:28,720 --> 00:54:36,040 issues. So as you notice that the budget dot is yellow as well. If you look at the budget 527 00:54:36,040 --> 00:54:41,040 numbers we have, the total funding for the project, which is some bond fund and some 528 00:54:41,040 --> 00:54:48,640 CO is about 9.5 or excuse me, $9.4 million. We're just under that encumbrances to date. 529 00:54:48,640 --> 00:54:53,280 We believe we're going to be fairly close to that number, but just want to highlight 530 00:54:53,280 --> 00:55:00,520 it. We are at about 80% construction on that project. Don't foresee too many other issues, 531 00:55:00,520 --> 00:55:05,760 but as we complete that project and then get into the demo, hopefully we won't notice any 532 00:55:05,760 --> 00:55:11,840 additional expenditures for this particular project. So very quick update on where we're 533 00:55:11,840 --> 00:55:17,200 at with that one. Certainly everybody's looking forward to getting this building online. The 534 00:55:17,200 --> 00:55:22,340 original building is about 5,500 square feet. You can see it's fairly small. The new building 535 00:55:22,340 --> 00:55:28,880 is nearly three times that at 15,800 square feet, which certainly is necessary to meet 536 00:55:28,880 --> 00:55:38,000 the demands of that particular response location for that facility. So the next is the 2019 537 00:55:38,000 --> 00:55:44,440 bond program and this project, next slide, is relevant to the public safety bond issuance 538 00:55:44,440 --> 00:55:52,040 or proposition one, I believe. This was for the police headquarters renovation and the 539 00:55:52,040 --> 00:55:56,740 police substation and firing range, which is out on vintage Boulevard. There's a couple 540 00:55:56,740 --> 00:56:02,240 of pictures there. I'll show you kind of where it's been. These have been presented to the 541 00:56:02,240 --> 00:56:08,040 council in some cases a couple of times with some various changes and you probably barely 542 00:56:08,040 --> 00:56:12,720 see the notes that are on some of these pictures. That's what was presented to the council. 543 00:56:12,720 --> 00:56:19,680 Just some changes to the exterior configuration of the headquarters there and then some depictions 544 00:56:19,680 --> 00:56:26,080 of some changes to the police substation and the firing range there on the bottom. Where 545 00:56:26,080 --> 00:56:32,040 we're at right now, you can see that everything's green, which is great to be. All these projects 546 00:56:32,040 --> 00:56:39,400 are in that. Right now we're in the design phase. We have received 90% construction documents 547 00:56:39,400 --> 00:56:46,180 and should have 100% construction documents here next month that will allow our construction 548 00:56:46,180 --> 00:56:52,480 manager at risk to work through that, get bids and then provide to the city in the end 549 00:56:52,480 --> 00:57:01,200 of October for council approval our guaranteed maximum price for all three of these buildings. 550 00:57:01,200 --> 00:57:07,360 As you can see right now, we are anticipating scope, schedule and budget are on track. Again, 551 00:57:07,360 --> 00:57:17,320 we're in the early phase, I would say, because the design effort will take us up to that 552 00:57:17,320 --> 00:57:24,400 release in October. We'll then start construction shortly thereafter, November timeframe. And 553 00:57:24,400 --> 00:57:28,480 then all three of these buildings have slightly a different phase, but they'll all be completed 554 00:57:28,480 --> 00:57:37,100 by the second quarter of 2022. Just as a reminder on the budget, the bond issuance was for approximately 555 00:57:37,100 --> 00:57:43,040 $62 million. We've expended to date about $1.5 million and projected about $4 million 556 00:57:43,040 --> 00:57:47,760 for the rest of this fiscal year, primarily finishing off the final design and then starting 557 00:57:47,760 --> 00:57:54,360 the construction phase of this project. I'd be happy to answer any questions I can on 558 00:57:54,360 --> 00:57:59,280 this project. Again, we're excited to get this thing moving. Certainly don't anticipate 559 00:57:59,280 --> 00:58:04,240 any snags at this point, but usually that happens when we begin the construction phase 560 00:58:04,240 --> 00:58:09,360 and start to find any possible unknowns, especially with the remodel on the headquarters building. 561 00:58:09,360 --> 00:58:14,960 And then subsequently the new construction will start immediately thereafter. 562 00:58:14,960 --> 00:58:24,320 Are there any questions for Gary? Scott? 563 00:58:24,320 --> 00:58:31,720 I would add one thing to Scott's presentation. As you saw, the police facility, we're only 564 00:58:31,720 --> 00:58:36,440 issuing the $4 million this year. And the reason we're able to do that and essentially 565 00:58:36,440 --> 00:58:40,720 match up our debt issuance with cash flow is we went to council with a commercial paper 566 00:58:40,720 --> 00:58:45,840 program, but since our last meets, since our last bond oversight committee, which they 567 00:58:45,840 --> 00:58:50,360 approved and essentially what that's functionally allowed us to do is issue that debt when we 568 00:58:50,360 --> 00:58:56,440 actually need the cash flow versus issuing the debt to enter into contract. So if we 569 00:58:56,440 --> 00:59:00,000 didn't have the commercial paper program, it's possible we would have had to issue the 570 00:59:00,000 --> 00:59:04,880 entire $62 million this fiscal year, obviously, which would have put some constraints on our 571 00:59:04,880 --> 00:59:09,560 tax rate. So it's really helped us layer in those issuances moving forward. So you'll 572 00:59:09,560 --> 00:59:19,920 see that on that issuance timeline as well. 573 00:59:19,920 --> 00:59:45,480 There's no questions. I guess we can move on. Is that the end of the? 574 00:59:45,480 --> 00:59:52,400 It is. We can move to the next item if there's no more questions. 575 00:59:52,400 --> 01:00:00,560 All right. Thank y'all for that report. Moving on to item D is receive a report, hold a discussion 576 01:00:00,560 --> 01:00:06,520 and give staff direction regarding the reallocation of project funds from the Moore Street expansion 577 01:00:06,520 --> 01:00:07,520 project. 578 01:00:07,520 --> 01:00:13,120 So each of the three remaining items were addressed during the presentations from both 579 01:00:13,120 --> 01:00:19,700 Gary and Todd in the previous item. So I can surely answer any additional questions you 580 01:00:19,700 --> 01:00:24,760 might have. This first one, as Todd mentioned, is reallocating funds from the Moore Street 581 01:00:24,760 --> 01:00:29,840 project to the Hickory Street project. So if there are any questions, we're here to answer 582 01:00:29,840 --> 01:00:34,840 them or any action that the committee has. 583 01:00:34,840 --> 01:00:45,200 Are there any questions regarding item D from the committee? 584 01:00:45,200 --> 01:00:46,200 Eric? 585 01:00:46,200 --> 01:00:53,320 Yeah, I just wanted to say I'm glad that the Hickory Street project is moving forward and 586 01:00:53,320 --> 01:00:58,240 that we're finding creative ways to get it done. I think that's really important. I did 587 01:00:58,240 --> 01:01:04,120 have one question just with the amount of funding that's moving there. I just wanted 588 01:01:04,120 --> 01:01:11,520 to ask whether that's all street work or if some of that is utility work, how does that 589 01:01:11,520 --> 01:01:15,560 breakdown work for the Hickory project? 590 01:01:15,560 --> 01:01:19,720 The funds that are moving because they're bond funds, they have to be used for streets. 591 01:01:19,720 --> 01:01:24,080 So that portion that's moving will only be used for street. Any of the utility work is 592 01:01:24,080 --> 01:01:28,320 handled in our utility budgets and would be budgeted separately. But especially because 593 01:01:28,320 --> 01:01:31,440 they're bond funds, they're restricted to only streets funding. 594 01:01:31,440 --> 01:01:36,160 Okay, thank you. It just seemed like a lot of money, but I guess it's because the base 595 01:01:36,160 --> 01:01:41,360 is probably so destroyed that it costs a lot to redo it to a deep depth, right? 596 01:01:41,360 --> 01:01:48,400 Yeah, it's a big, big project. 597 01:01:48,400 --> 01:01:51,360 Any more questions on item D? 598 01:01:51,360 --> 01:01:55,840 I'll move to approve. 599 01:01:55,840 --> 01:02:01,760 I'll second. 600 01:02:01,760 --> 01:02:09,640 All right. Got a motion and a second to reallocate the project funds from the Moore Street expansion 601 01:02:09,640 --> 01:02:21,160 project. Any discussion? Any opposed? None. Motion passes. 602 01:02:21,160 --> 01:02:31,600 Item E is regarding the reallocation of the project funds to the Joe Skiles Park playground. 603 01:02:31,600 --> 01:02:40,160 We have any questions on that? 604 01:02:40,160 --> 01:02:55,800 No questions. I'll move approval. 605 01:02:55,800 --> 01:02:56,800 We got a motion. 606 01:02:56,800 --> 01:02:59,800 I'll second. It's Randy. 607 01:02:59,800 --> 01:03:08,360 All right, Randy. So we've got a motion and a second. Any discussion? 608 01:03:08,360 --> 01:03:12,360 Any opposed? 609 01:03:12,360 --> 01:03:16,800 Hearing none, motion passes. Thank you. 610 01:03:16,800 --> 01:03:22,360 Item F, discussion regarding the reallocation of the project funds from the Southwest master 611 01:03:22,360 --> 01:03:40,680 plan. If there aren't any questions on that, I'll entertain a motion as well. 612 01:03:40,680 --> 01:03:44,780 Moved. Second. 613 01:03:44,780 --> 01:03:49,280 We have a motion and a second. Any discussion? 614 01:03:49,280 --> 01:03:55,400 Any opposed? Motion passes. 615 01:03:55,400 --> 01:04:04,400 Thank you all. 616 01:04:04,400 --> 01:04:11,280 David, is there anything else we need to discuss? 617 01:04:11,280 --> 01:04:16,080 The next item would be concluding items. So if we move to concluding items, which would 618 01:04:16,080 --> 01:04:20,240 be a time if there's anything from the committee that you would like to see in particular at 619 01:04:20,240 --> 01:04:27,280 the next committee meeting. If not, obviously we would, as always, bring back those status 620 01:04:27,280 --> 01:04:32,560 reports and we would have any presentations for reallocation of funds and likely bring 621 01:04:32,560 --> 01:04:36,080 a very similar capital projects presentation for sure to give an update on those street 622 01:04:36,080 --> 01:04:37,920 projects. 623 01:04:37,920 --> 01:04:46,520 Susan? Could you next time bring back how the property 624 01:04:46,520 --> 01:04:52,160 tax appraisals are fitting if it's moving the way that we thought it was going to? 625 01:04:52,160 --> 01:04:57,640 Absolutely. And I can just give a quick highlight on that and bring more detail back where we'll 626 01:04:57,640 --> 01:05:03,440 get our certified estimates next week for the next fiscal year. And they are trending 627 01:05:03,440 --> 01:05:09,760 higher than our projections currently. We have a 7 to 8% appraised value increase in 628 01:05:09,760 --> 01:05:14,400 our budget, but those are going to be firmed up tomorrow and then as we move forward. So 629 01:05:14,400 --> 01:05:18,240 we'll surely bring an update of that at the next meeting. That's great. 630 01:05:18,240 --> 01:05:19,240 Thank you. 631 01:05:19,240 --> 01:05:26,860 You can already see Tim saying that we undershot again. I can already read his mind. 632 01:05:26,860 --> 01:05:32,440 I think the one thing, though, and I'm glad you asked that, Susan, I think the one thing 633 01:05:32,440 --> 01:05:36,440 we're a little concerned about is we've gone through and studied trends after the last 634 01:05:36,440 --> 01:05:43,640 few recessions and the appraisal district's usually a year or two behind that. So we are, 635 01:05:43,640 --> 01:05:48,960 we have significantly downgraded our 2021 estimates just based on we think we're going 636 01:05:48,960 --> 01:05:53,880 to be well above our assumption this year. Next year, though, we're pretty sure that 637 01:05:53,880 --> 01:05:57,520 we're going to see that drop a little bit, although it's going to be interesting to see 638 01:05:57,520 --> 01:06:02,600 how they how they handle this. But every time the last few recessions, we've seen a decrease. 639 01:06:02,600 --> 01:06:07,000 In fact, there was a couple of times it went negative in 2008 or nine. I think it was the 640 01:06:07,000 --> 01:06:16,480 last time that happened. So we're monitoring it closely. 641 01:06:16,480 --> 01:06:20,640 Thank you. Any, any, any other requests? Eric? 642 01:06:20,640 --> 01:06:28,080 Yeah, I guess to follow on on that, David, when you bring the report back next time, 643 01:06:28,080 --> 01:06:39,480 I'd like to understand how the 10 percent growth cap on AV for residences factors into 644 01:06:39,480 --> 01:06:46,840 what the AV growth we report is. Does that make sense, such that if AV grows, if the 645 01:06:46,840 --> 01:06:52,720 actual assessed value grows slower, but some properties were capped previously, then the 646 01:06:52,720 --> 01:06:56,160 amount of tax revenue that comes in from those properties would continue to grow, even though 647 01:06:56,160 --> 01:07:02,720 perhaps their assessed value is not growing. That's one of those complications. I'd like 648 01:07:02,720 --> 01:07:05,560 to understand better. I think we have a, I think we have a budget 649 01:07:05,560 --> 01:07:11,040 slide that we're taking to council here. And we are may have already done that to kind of 650 01:07:11,040 --> 01:07:15,500 shed some light on that, even though we're at we're actually presenting effective rate 651 01:07:15,500 --> 01:07:21,320 budget in our initial estimates below it, but the value of the homes is still pushing 652 01:07:21,320 --> 01:07:25,280 out pressure on that. So I think that's a good discussion to have. Does council have 653 01:07:25,280 --> 01:07:29,760 the same questions? OK, absolutely. Yeah, we can bring them. 654 01:07:29,760 --> 01:07:38,380 And then secondly, I recall during the discussion of initiating the commercial paper program, 655 01:07:38,380 --> 01:07:45,700 one of the risks that was highlighted was in a constricted credit market, the convertibility 656 01:07:45,700 --> 01:07:51,720 of the long term commercial paper may be a little bit of a concern. So I don't think 657 01:07:51,720 --> 01:07:56,960 we've run into nearly the credit crisis we had back in 2008. But I'd be interested to 658 01:07:56,960 --> 01:08:01,120 know whether how that market is going right now and if that has any implications on how 659 01:08:01,120 --> 01:08:05,540 we're operating the program. Sure. We'll bring a full finance presentation 660 01:08:05,540 --> 01:08:10,640 to the next one and touch on all those pieces. I would just very quickly make clear that 661 01:08:10,640 --> 01:08:14,440 what we're doing with the commercial paper program right now is using it for appropriation 662 01:08:14,440 --> 01:08:18,920 purposes, but we have no intent to actually issue any commercial paper. So that wouldn't 663 01:08:18,920 --> 01:08:23,280 be relevant to us right now. But I think it's it would be great to kind of give you guys 664 01:08:23,280 --> 01:08:27,560 a full a full scope of what that program is and how we're using it. 665 01:08:27,560 --> 01:08:32,880 And I think we're going through a we have a ratings call. Did we have one recently or 666 01:08:32,880 --> 01:08:39,640 do we have one coming up? Yeah, we just had two ratings calls last week that that both 667 01:08:39,640 --> 01:08:43,160 of those ratings will be coming out here in the next couple of weeks for our debt issuance 668 01:08:43,160 --> 01:08:55,240 metal probably be more key to the conversation than anything. Absolutely. Yeah. Okay. Anymore 669 01:08:55,240 --> 01:09:04,280 comments from the committee requests. All right. Well thank you everybody for your participation 670 01:09:04,280 --> 01:09:18,240 today. Thanks to Todd and the staff. Appreciate you guys. Your motion to adjourn. I'll move. 671 01:09:18,240 --> 01:09:27,360 Is that a second? Tim, your smile. Thanks, everyone. Thanks. Great to see him.