00:00:00.000 --> 00:00:08.360
 unmuted. Unmute. We've determined that a quorum has been met. The downtown Denton tax increment

00:00:08.360 --> 00:00:13.120
 financing reinvestment zone number one board of the city of Denton, Texas will now convene

00:00:13.120 --> 00:00:20.880
 in a regular meeting at 1207 PM this Wednesday, the 22nd day of July 2020. Our first order

00:00:20.880 --> 00:00:26.320
 of business is one a consider approval and or corrections of the meeting minutes from

00:00:26.320 --> 00:00:32.440
 January 22nd 2020 downtown Denton tax increment financing reinvestment zone number one board

00:00:32.440 --> 00:00:43.240
 of the city of Denton, Texas. Are there any corrections to the minutes as distributed?

00:00:43.240 --> 00:00:53.600
 No corrections. Do we have a motion? Motion to accept. We have a motion to accept from

00:00:53.600 --> 00:00:59.800
 John Rins. Do we have a second? All second from Ben Easley. We have a second from Ben

00:00:59.800 --> 00:01:08.960
 Easley. It is moved and seconded that we accept the approved the minutes as distributed. All

00:01:08.960 --> 00:01:13.800
 those in favor of adopting the motion say well, so I go around the horn. I'm sorry.

00:01:13.800 --> 00:01:20.040
 So yes, and you can go in the order that you see everyone if that helps. Okay. So then

00:01:20.040 --> 00:01:35.720
 easily. Is that a yes or no? Yes. Paul, is it a yes or no? Aye. Aye. Alex? Aye. Can you

00:01:35.720 --> 00:01:51.280
 handle good enough? Aye. Gerard? Aye. I believe. Is that it? It's all I see on my screen. John,

00:01:51.280 --> 00:01:56.360
 did you vote? Aye. Oh, John, I missed you up there. Sorry. Aye. Okay. So it's unanimous.

00:01:56.360 --> 00:02:05.880
 Can we go to the next order of business now? Yes. Okay. Next order of business. We're going

00:02:05.880 --> 00:02:12.360
 to skip to 1C receive report and hold discussion and give staff direction regarding a downtown

00:02:12.360 --> 00:02:17.440
 reinvestment grant for signage for 213 East Hickory Street. The downtown economic development

00:02:17.440 --> 00:02:24.320
 committee recommends a grant in the amount of $7,313. The chair recognizes Jessica Rogers.

00:02:24.320 --> 00:02:30.760
 Right. Well, thank you. We're excited to bring forward a grant and we appreciate the patience

00:02:30.760 --> 00:02:37.560
 of our applicant as his application was interrupted due to COVID and committee is not meeting.

00:02:37.560 --> 00:02:42.840
 So we appreciate his ongoing patience as we've gone through this, but I'm going to actually

00:02:42.840 --> 00:02:47.920
 turn it over to Christina Davis from our team to do the presentation and then we'll open

00:02:47.920 --> 00:02:53.320
 it up for questions. And as you can see, Eric is here with us to answer any questions about

00:02:53.320 --> 00:02:58.720
 the project as well. Excuse me. Are we skipping the previous item? We're just going to go

00:02:58.720 --> 00:03:26.760
 out of order. Oh, okay. So that Eric, for Eric's convenience. I see.

00:03:26.760 --> 00:03:56.740
 Hi, my name is Christina Davis. I'm the economic development specialist. Today I'll give you

00:03:56.740 --> 00:04:01.560
 a presentation regarding the downtown reinvestment grant application for signage at two one three

00:04:01.560 --> 00:04:06.040
 East Hickory Street. The business at this location is Hickory to Oak, also known as

00:04:06.040 --> 00:04:11.200
 H2O. The downtown economic development committee has reviewed the application and recommends

00:04:11.200 --> 00:04:18.000
 a grant in the amount of $7,313. The next step in the approval process for this application

00:04:18.000 --> 00:04:34.600
 is a review on a recommendation by this board. Projects will be reviewed with the following

00:04:34.600 --> 00:04:40.200
 considerations in mind, increase in property valuation or increase in sales tax, historical

00:04:40.200 --> 00:04:47.000
 accuracy or design quality. It improves capacity of water, wastewater or electric service improvements

00:04:47.000 --> 00:04:52.880
 to health and safety results in significant increase in downtown population. Other impacts

00:04:52.880 --> 00:04:58.200
 could include but are not limited to not limited to partners with other businesses such as

00:04:58.200 --> 00:05:03.360
 shared parking is a target business for like groceries or pharmacy, promotes development

00:05:03.360 --> 00:05:10.560
 of arts and entertainments downtown. Additional considerations include removal of slip covers

00:05:10.560 --> 00:05:15.920
 or non-historical added facades, repointing brick or replacing mortar joints, replacing

00:05:15.920 --> 00:05:20.760
 and restoring cornices, removing paint from brick, replacing windows, restoring trance

00:05:20.760 --> 00:05:30.640
 and windows, roof and foundation work. Replacing and adding or repairing awnings and signs.

00:05:30.640 --> 00:05:35.440
 Signs may include sign boards, projecting signs and pedestrian signage, which includes

00:05:35.440 --> 00:05:44.620
 window signs, hanging signs and awning or canopy signs. Also reimbursement for city

00:05:44.620 --> 00:05:50.800
 of Denton water and wastewater impact fees, upgrades to water, wastewater, electric service,

00:05:50.800 --> 00:05:56.920
 including interior upgrades as well as exterior service upgrades, as best as mold evapement,

00:05:56.920 --> 00:06:05.240
 fire suppression systems and ADA compliance. Hickory Oak also known as H2O is a multi-building

00:06:05.240 --> 00:06:17.840
 project with access from both East Hickory and East Oak streets in downtown. This grant

00:06:17.840 --> 00:06:23.560
 application for the coffin race mural in metal and neon blade sign is specific for the 213

00:06:23.560 --> 00:06:27.200
 East Hickory Street address of the project directly across the street from the city's

00:06:27.200 --> 00:06:33.380
 Hickory Street public parking lot. The mural featuring a day of the dead themed skeleton

00:06:33.380 --> 00:06:37.720
 driving a coffin is a celebration of one of the most noteworthy annual events in the Hickory

00:06:37.720 --> 00:06:45.860
 Street area downtown on Denton's day of the dead festival. The 68 by 72 inch double sided

00:06:45.860 --> 00:06:50.520
 metal blade sign which features exposed neon will help revitalize the building to be another

00:06:50.520 --> 00:06:58.640
 addition of rebirth in the area. Total improvements for this project include signage. In 2013

00:06:58.640 --> 00:07:05.120
 the property at 211 East Hickory was awarded a $10,000 grant for facade awning and paint

00:07:05.120 --> 00:07:12.820
 improvements. Current grant guidelines allow for up to $25,000 per property. Because addresses

00:07:12.820 --> 00:07:19.080
 of 211, 213 and 215 East Hickory are now one real property plan, this property is eligible

00:07:19.080 --> 00:07:24.920
 to receive up to $15,000 in grant awards through the program. On July 7th the downtown economic

00:07:24.920 --> 00:07:29.200
 development committee reviewed and scored the grant program application. The application

00:07:29.200 --> 00:07:35.320
 received a score of 22 which allows for a recommendation of up to $10,000. Estimated

00:07:35.320 --> 00:07:43.160
 expenses submitted for the new signs and the allowable project cost is $14,625. Under the

00:07:43.160 --> 00:07:49.060
 grant guidelines applicants can request 50% of the allowable project costs up to $50,000.

00:07:49.060 --> 00:07:59.160
 This grant request is for $7,313. The downtown economic development committee has recommended

00:07:59.160 --> 00:08:05.160
 approval to the tourist number one board for a grant request of $7,313 with a unanimous

00:08:05.160 --> 00:08:10.800
 vote of 8 to 0. To assist you in your discussion we provided three options for recommendations

00:08:10.800 --> 00:08:15.800
 from this board to the city council. Option one is make a recommendation to the Denton

00:08:15.800 --> 00:08:21.880
 City Council to approve the grant requested from Hickory to Oak in the amount of $7,313

00:08:21.880 --> 00:08:26.400
 and as recommended by the downtown economic development committee. Option two would be

00:08:26.400 --> 00:08:30.800
 make a recommendation to the Denton City Council to approve the grant request but in another

00:08:30.800 --> 00:08:37.600
 amount and option three would be to make no recommendation to the Denton City Council.

00:08:37.600 --> 00:08:41.460
 This ends my presentation but the grant applicant Eric Polito is in attendance to answer any

00:08:41.460 --> 00:08:55.800
 questions you may have. I recognize John. Eric what is the target date at this point?

00:08:55.800 --> 00:09:02.120
 Hey John we're loosely trying to look at fall obviously you know like everyone we're kind

00:09:02.120 --> 00:09:08.280
 of just seeing what what changes it's we haven't got our CO yet either and we kind of it's

00:09:08.280 --> 00:09:14.640
 on a slow you know track right now but we are close to finishing it's just trying to

00:09:14.640 --> 00:09:19.620
 figure out when is the best time you know to launch it just because as you know so much

00:09:19.620 --> 00:09:25.320
 is put in up front we're trying to figure out when that best timing would be. Okay are

00:09:25.320 --> 00:09:30.040
 there any external issues that could prevent you guys from opening up given all the COVID

00:09:30.040 --> 00:09:35.080
 stuff or is it really just internal decision making as it relates to COVID and the market

00:09:35.080 --> 00:09:40.500
 and so forth. Yeah I think it's it's more that of course you know we we want to be able

00:09:40.500 --> 00:09:45.880
 to offer what we're going to offer long term and with everything going on and as many restaurants

00:09:45.880 --> 00:09:51.600
 have done things are kind of sized down and so I guess the question would be do we open

00:09:51.600 --> 00:09:58.840
 but with a size down offering and operation and footprint really because we don't have

00:09:58.840 --> 00:10:04.280
 the need for more. So those are some of the things that we're considering or do you just

00:10:04.280 --> 00:10:09.320
 wait until it's good and safe to do the full thing that you know was imagined from the

00:10:09.320 --> 00:10:13.480
 beginning so. So it's really just the internal things you talked about you don't see any

00:10:13.480 --> 00:10:25.000
 external things that could come in the way. Okay. No. That's all I've got. Thank you.

00:10:25.000 --> 00:10:35.240
 I recognize Ben. Is it I feel like in the past we've we've heard the overall costs

00:10:35.240 --> 00:10:41.080
 of some projects. Eric do you feel comfortable telling us the overall cost that you all have

00:10:41.080 --> 00:10:46.560
 incurred on this so far. I don't know that exact number Ben I could I could get more

00:10:46.560 --> 00:10:53.720
 information but I could tell you it's it's a lot more than this piece and I wish that

00:10:53.720 --> 00:10:58.920
 we would have done a better job of getting some of the other facade renovations that

00:10:58.920 --> 00:11:04.760
 we were needing to do and did do into this program as well with like awnings and such

00:11:04.760 --> 00:11:08.720
 and obviously some of those buildings are new structures as well like where the bathrooms

00:11:08.720 --> 00:11:14.640
 are where that that day of the dead mural is. But thanks to Christina we were able at

00:11:14.640 --> 00:11:18.280
 least you know get a couple of these things in there especially because it applied more

00:11:18.280 --> 00:11:26.000
 to to signage you know. Yeah. Yeah. And I think when when I had walked in there oh man

00:11:26.000 --> 00:11:32.280
 this was it seems like it was yesterday but it's COVID world right now. Y'all had really

00:11:32.280 --> 00:11:38.440
 done some work on that entire property. Yeah. There's 1700 to drop in the bucket here. There's

00:11:38.440 --> 00:11:43.120
 a lot of work that's been done and we've really tried to preserve a lot of the the history

00:11:43.120 --> 00:11:48.120
 that's in the building. We repurposed a lot of the lights to get them to work and be hung

00:11:48.120 --> 00:11:54.240
 again. We exposed a mural that's inside that was all kind of blocked by just you know stucco

00:11:54.240 --> 00:12:00.160
 like type you know coverage of brick like they used to do. And yeah the family still

00:12:00.160 --> 00:12:06.680
 owns the property as well. So that's a cool aspect that we wanted to touch upon. I know

00:12:06.680 --> 00:12:10.520
 that's a tangent but but yeah there is a lot of cool reinvestment that we feel like we've

00:12:10.520 --> 00:12:17.640
 done in the building and can't wait to have folks in there. Right on. That's all I've

00:12:17.640 --> 00:12:31.880
 got. Recognize Paul. Yeah. Hey Paul. Am I on mute. I don't even know how I heard this.

00:12:31.880 --> 00:12:37.920
 Some kind of rumor but is it is it true that you've actually got a for real preserve Quaker

00:12:37.920 --> 00:12:44.400
 Town house on the property. Well we have the property that was across the street at the

00:12:44.400 --> 00:12:48.800
 law firm. They were going to demolish it and they basically offered it up to us for free

00:12:48.800 --> 00:12:57.360
 to use if we paid to have it moved. So that is from from you know the HLC at the time

00:12:57.360 --> 00:13:03.280
 that was what was presumed that that house that was at the law firm that wasn't its original

00:13:03.280 --> 00:13:07.600
 spot either and that it would maybe structure that was brought there and then we brought

00:13:07.600 --> 00:13:12.160
 it over. We're not using it right now. It's just kind of sitting on the concrete plat

00:13:12.160 --> 00:13:19.080
 that's next to the main concept that we have. But we had hoped to use it and repurpose it

00:13:19.080 --> 00:13:23.400
 for an outside structure. But yeah you're correct. There's there's some history there

00:13:23.400 --> 00:13:27.480
 and we didn't want it to get demolished. So it was cool to get to use it. Just cost a

00:13:27.480 --> 00:13:35.960
 little bit of money to move it. Yeah. Well I appreciate that. Thanks. Anyone else have

00:13:35.960 --> 00:13:50.760
 questions. Am I accepting a motion or. So but there can be discussion after the motion

00:13:50.760 --> 00:13:55.480
 as well. I thought we were just we're just talking to the applicant but we could have

00:13:55.480 --> 00:14:11.980
 deliberation even after a motion. Yes. So are we taking a motion to approve or to vote

00:14:11.980 --> 00:14:20.200
 or Paul do you still want a discussion. Well do you want to pull up the three possible.

00:14:20.200 --> 00:14:27.400
 Yeah I'm happy to hear you know I have things I want to ask and talk about. But I'm happy

00:14:27.400 --> 00:14:33.200
 to hear other folks deliberation first. I'm not ready to go straight to the vote. I have

00:14:33.200 --> 00:14:42.960
 a question that if I missed it I apologize. I'm sorry. Yeah. Could the downtown economic

00:14:42.960 --> 00:14:50.100
 development group that I serve on but was not present for the last meeting I assume

00:14:50.100 --> 00:14:57.080
 made a recommendation of the amount stated. Maybe someone could clarify as to what what

00:14:57.080 --> 00:15:03.800
 their position was and why the amount. If I missed that part I apologize. Can you review

00:15:03.800 --> 00:15:10.600
 that for. Yes. So the downtown economic development committee as you're aware scores the applications

00:15:10.600 --> 00:15:17.120
 and so the average score that this application received was twenty two based on that scoring

00:15:17.120 --> 00:15:21.920
 criteria and of course you know as a member of that committee that each individual member

00:15:21.920 --> 00:15:27.000
 has a scoring sheet but has the ability to score based on how they feel it meets the

00:15:27.000 --> 00:15:33.040
 criteria. So the consensus again was an average of twenty two which makes the project eligible

00:15:33.040 --> 00:15:38.120
 of up to ten thousand dollars. This project is was requesting less than that amount. So

00:15:38.120 --> 00:15:44.360
 it's equal to 50 percent of their expenses. So in this case they were eligible for 14.

00:15:44.360 --> 00:15:48.000
 The project expenses that were eligible were fourteen thousand. I don't have the number

00:15:48.000 --> 00:15:54.360
 in front of me but the amount they were recommending from the DEDC was seven thousand three hundred

00:15:54.360 --> 00:16:03.680
 and thirteen which is 50 percent of their project expenses. Okay. I'm going back and

00:16:03.680 --> 00:16:11.960
 reading there. Okay this is for signs. So they might they didn't apply for other other

00:16:11.960 --> 00:16:20.560
 eligible expenses on this building. They didn't feel the need to. If I could answer that Alex

00:16:20.560 --> 00:16:28.120
 so we were because of the cadence and process that that you need to go through to qualify

00:16:28.120 --> 00:16:34.840
 for any type of assistance we weren't able to apply for those things because they were

00:16:34.840 --> 00:16:42.280
 already done and we had to submit before we commenced work on these things which in the

00:16:42.280 --> 00:16:47.560
 case of the mural and the signage we did submit before we commenced work and the other things

00:16:47.560 --> 00:16:52.160
 we did not. I got you. Okay. Otherwise we would have been yeah I would have qualified

00:16:52.160 --> 00:17:06.500
 for a lot more certainly. Okay that's all I have. Other questions for Eric or staff.

00:17:06.500 --> 00:17:19.200
 The next part looking at the three potential deliberations. Christina is going to share

00:17:19.200 --> 00:17:45.840
 that slide. Just takes one second to get it pulled up. So those are the three options

00:17:45.840 --> 00:17:50.640
 that you're seeing on your screen right now is option one. Make a recommendation to the

00:17:50.640 --> 00:17:57.500
 city council that concurs with the downtown economic development committee. Make a recommendation

00:17:57.500 --> 00:18:04.400
 of a separate amount or make don't make a recommendation to approve the grant. Are you

00:18:04.400 --> 00:18:12.420
 ready for a motion. I believe we're ready for a recommendation. I'll make a motion to

00:18:12.420 --> 00:18:20.980
 for option one to approve the amount requested of seventy three thirteen. I'll second the

00:18:20.980 --> 00:18:45.680
 motion. First from Alex a second from Ben. Paul do you have a question. Yes I do. Wait

00:18:45.680 --> 00:18:53.480
 are we allowed a question at this point. Yes. Yes. Okay go ahead. Yeah I guess you know

00:18:53.480 --> 00:19:03.400
 a question potentially some comment. So my question is under what what considerations

00:19:03.400 --> 00:19:12.960
 can apply to to make the recommendation different than the requested amount if all the expenses

00:19:12.960 --> 00:19:23.460
 is qualified. And here and let me give you some context. You know I weigh very heavily

00:19:23.460 --> 00:19:27.160
 and seriously it's not a huge amount of money here we're talking about but I still weigh

00:19:27.160 --> 00:19:33.680
 very seriously public benefit benefit versus private benefit. We can only spend taxpayer

00:19:33.680 --> 00:19:41.080
 money for public benefit and the whole purpose of the downtown TIF and the reinvestment grants

00:19:41.080 --> 00:19:47.720
 is that it's a public benefit to revitalize the downtown area and to invest in it. And

00:19:47.720 --> 00:19:53.960
 boy if there was ever a project that fits the bill perfectly you know this sure does

00:19:53.960 --> 00:19:59.520
 on the whole and I you know just as a citizen like I really appreciate what they're doing

00:19:59.520 --> 00:20:10.640
 with the property where where I you know have some concern is you've got two different components

00:20:10.640 --> 00:20:13.640
 that went into the cost and I acknowledge what Alex said it could have been a whole

00:20:13.640 --> 00:20:17.360
 lot of other things that they submitted for the timing had been different but such you

00:20:17.360 --> 00:20:25.880
 know but be that as it may the mural supporting you know kind of a debt in public event and

00:20:25.880 --> 00:20:31.000
 decorative you know kind of on the street and all seems to be seems to very clearly

00:20:31.000 --> 00:20:39.120
 square with the public purpose intended. Now the sign for the individual business itself

00:20:39.120 --> 00:20:47.680
 clearly qualifies by the way it's laid out in the presentation it's signage and that's

00:20:47.680 --> 00:20:56.000
 a sign but that's why I'm asking like what are the criteria that we're sort of allowed

00:20:56.000 --> 00:21:01.840
 to judge on because if I if I weigh is that really I'm very happy to you know be instructed

00:21:01.840 --> 00:21:09.640
 by my colleagues but but the question I ask myself is that really public benefit or primarily

00:21:09.640 --> 00:21:15.960
 or private benefit and we weigh those things that that that scale for like every parks

00:21:15.960 --> 00:21:22.880
 program yeah that's an official framework that we use to evaluate things how much of

00:21:22.880 --> 00:21:28.040
 it to what degrees of public to what degrees of private it just feels much more you know

00:21:28.040 --> 00:21:34.520
 the sign advertising your business you know strikes me as much more private benefit so

00:21:34.520 --> 00:21:42.840
 so despite the fact that I think the total project is so bang on right you know I would

00:21:42.840 --> 00:21:49.920
 be more inclined to you know give the grant essentially for the to cover 50% of the mural

00:21:49.920 --> 00:21:57.760
 cost that that but I don't know really how we're meant to apply the criteria so that's

00:21:57.760 --> 00:22:06.760
 all one with Alex leading the TIF or the Dead Sea board he might be able to speak to that

00:22:06.760 --> 00:22:15.840
 really well and then I think it might be appropriate also to sort of revisit why it starts at the

00:22:15.840 --> 00:22:27.400
 Dead Sea level to bring to hers that be appropriate sure so I so Melissa's reference the former

00:22:27.400 --> 00:22:32.160
 downtown task force is the downtown economic development committee is the committee she's

00:22:32.160 --> 00:22:38.280
 referencing and that scores the application the criteria that they score on are the criteria

00:22:38.280 --> 00:22:45.360
 that are adopted by City Council by ordinance included in that is awnings and signs as a

00:22:45.360 --> 00:22:50.120
 specific criteria of which they consider eligible funding so that's a they were provided that

00:22:50.120 --> 00:22:57.080
 guidance by the ordinance adopted by City Council but I'll let Alex maybe talk to the

00:22:57.080 --> 00:23:02.040
 staff doesn't score the application we just make sure that it complies with the ordinance

00:23:02.040 --> 00:23:06.920
 as adopted in the criteria that were given and so maybe Alex or Melissa can speak to

00:23:06.920 --> 00:23:12.800
 what process they go through or what evaluation they take into perspective as they score an

00:23:12.800 --> 00:23:20.160
 application yeah I'm glad to weigh in and raise my hand it's just I don't I don't want

00:23:20.160 --> 00:23:25.600
 to get into a theoretical debate if we can avoid it but the whole nature of this program

00:23:25.600 --> 00:23:32.320
 and this application and the eligible expenses if you if you if they were to have applied

00:23:32.320 --> 00:23:36.320
 for this on the basis of all the work they've done if that had if that had happened in the

00:23:36.320 --> 00:23:44.600
 right timing it's hard to make an argument that much of these cause much of the cost

00:23:44.600 --> 00:23:54.440
 that we typically award on our public benefit you know impact fees you know utility upgrades

00:23:54.440 --> 00:23:58.520
 which oftentimes that we're not talking about in the street they might be but most times

00:23:58.520 --> 00:24:03.280
 we're talking about utility upgrades to the building itself interior code improvements

00:24:03.280 --> 00:24:07.880
 to the building itself those are the things that they've done in this case and would would

00:24:07.880 --> 00:24:14.320
 have scored you know a $25,000 grant easily and so but if you try to make the argument

00:24:14.320 --> 00:24:19.600
 how much this is public benefit I mean I don't know it's more that that's where we're getting

00:24:19.600 --> 00:24:26.280
 the philosophical argument so to break this one down on that basis would be to me open

00:24:26.280 --> 00:24:34.480
 it up you could have that argument and and do this every single time so and again it

00:24:34.480 --> 00:24:40.760
 is economic development let's hope that this is a a you know successful project that we're

00:24:40.760 --> 00:24:45.280
 back to normal business and there's lots of people down there patronizing this business

00:24:45.280 --> 00:24:51.240
 and and enjoying themselves and then spending tax dollars that spending dollars that equate

00:24:51.240 --> 00:24:56.400
 to sales tax dollars for the city and can be used for the public benefit so and like

00:24:56.400 --> 00:25:02.440
 I said in that so in the sense that you know you're just going to pick out and do that

00:25:02.440 --> 00:25:09.960
 with signage is I think unfair I don't know if I accomplished what I was asked to but

00:25:09.960 --> 00:25:16.040
 that's what I wanted to state John I see that your hand is raised Christina I'd like to

00:25:16.040 --> 00:25:23.440
 ask you before I moved to have John take the floor could you bring up the Dead Sea scoring

00:25:23.440 --> 00:25:34.120
 criteria that was that in the deck she did have a slide on the project considerations

00:25:34.120 --> 00:25:38.360
 at the very beginning of what are the items that could be taken into consideration but

00:25:38.360 --> 00:25:45.360
 I don't think we have the sample score sheet with this item we have it with the next item

00:25:45.360 --> 00:25:51.560
 we may be able to bring it up historic accuracy any of the y'all just have that just sort

00:25:51.560 --> 00:26:00.700
 of as a yes so in your backup with their full application it has the table that has it broken

00:26:00.700 --> 00:26:05.560
 down and the items that are taken into account on the scoring system or economic impact historic

00:26:05.560 --> 00:26:11.720
 accuracy and design upgrades to utilities or impact fees increases in population interior

00:26:11.720 --> 00:26:16.400
 code improvements and then there is an other category that includes partnerships with other

00:26:16.400 --> 00:26:21.440
 businesses such as shared parking the project is a targeted business such as a grocery store

00:26:21.440 --> 00:26:27.200
 pharmacy or a locally owned business that it promotes didn't development excuse me promotes

00:26:27.200 --> 00:26:31.160
 development of Denton Arts and Entertainment and then the longevity of the business so

00:26:31.160 --> 00:26:36.480
 that's the scoring sheet and then Christina included in her presentation a slide that outlined

00:26:36.480 --> 00:26:42.680
 the guidance that is provided in the ordinance adopting the program and it states that projects

00:26:42.680 --> 00:26:47.440
 will be reviewed and ranked with the following consideration so increase in a property value

00:26:47.440 --> 00:26:53.080
 or generation of sales tax project rehabilitation that reflects historic accuracy improves the

00:26:53.080 --> 00:26:59.080
 capacity of water wastewater or electric utility services provides improvements to health and

00:26:59.080 --> 00:27:04.480
 safety water wastewater impact fees are assessed and the project will result in a significant

00:27:04.480 --> 00:27:09.200
 increase in downtown population either day or night or other appropriate impacts may

00:27:09.200 --> 00:27:13.360
 be considered on a case-by-case basis including but not limited to partnerships with other

00:27:13.360 --> 00:27:20.200
 businesses targeted businesses and promotion of arts and entertainment so those are yes

00:27:20.200 --> 00:27:28.120
 those are the criteria that are reviewed thank you John so a bit of a question bit of a statement

00:27:28.120 --> 00:27:35.760
 um this to me isn't part of the broad scope of TURS in its budget but a segment of it

00:27:35.760 --> 00:27:40.960
 is the grant program so i'm just bringing that up paul that if this was in the broader

00:27:40.960 --> 00:27:46.800
 scope maybe some of those questions come into play but this is the separate grant program

00:27:46.800 --> 00:27:51.400
 and we probably should we should be that probably we should be looking at it from that perspective

00:27:51.400 --> 00:28:06.520
 in those criteria because that is am i correct yeah i agree i agree okay any further discussion

00:28:06.520 --> 00:28:17.520
 or questions we had a motion and a second on the table do we now just go around the

00:28:17.520 --> 00:28:26.480
 horn for yeah um yes if there's no more discussion i don't see any hand raised so we'll go around

00:28:26.480 --> 00:28:40.080
 the horn too with a yay or nay john yay then yay alex yay paul yeah on balance it's compelling

00:28:40.080 --> 00:28:51.960
 so i'm a i'm an aye aye aye gerard all right melissa's an aye as well the recommendation

00:28:51.960 --> 00:28:58.320
 carries unanimously we unanimously vote yes so we'll be moving this forward as fast as

00:28:58.320 --> 00:29:02.880
 we can to the city council and we'll coordinate with eric to make sure he gets to join us

00:29:02.880 --> 00:29:11.160
 for one more meeting thank you eric thanks for coming eric of course good luck with everything

00:29:11.160 --> 00:29:20.080
 thank you eric appreciate everything now we'll um come back to 1b which is receive a report

00:29:20.080 --> 00:29:24.360
 hold a session and give staff direction regarding amendments to the downtown reinvestment grant

00:29:24.360 --> 00:29:33.640
 program policy like uh jessica and christina too yes so we have a very quick presentation

00:29:33.640 --> 00:29:38.120
 christina is going to pull it up for me and drive for me so that i don't have to keep

00:29:38.120 --> 00:30:04.920
 moving around i apologize for the delay here we're switching presentations all right so

00:30:04.920 --> 00:30:10.760
 i'll just do a quick overview of a couple conversations that we've had since january

00:30:10.760 --> 00:30:18.440
 so next slide so today we'll just have the discussion and receive direction regarding

00:30:18.440 --> 00:30:25.800
 updates to the downtown reinvestment grant policy next slide so to remind everyone we

00:30:25.800 --> 00:30:32.640
 have been working on this for a while uh back in january we received or we held a discussion

00:30:32.640 --> 00:30:39.840
 about making an amendment to the downtown reinvestment grant policy to include ada improvements

00:30:39.840 --> 00:30:45.240
 as interior code improvements as eligible expenses in that category of the policy and

00:30:45.240 --> 00:30:50.720
 also amend the scoring sheet to specifically list ada improvements under the interior code

00:30:50.720 --> 00:30:56.600
 improvement section as an eligible scoring item the terse board provided staff direction

00:30:56.600 --> 00:31:01.280
 that you wanted direction from the downtown economic development committee prior to your

00:31:01.280 --> 00:31:06.320
 consideration of changes so on february 6th which does seem like a very long time ago

00:31:06.320 --> 00:31:12.640
 now we actually took this item to the downtown committee and they concurred with the terse

00:31:12.640 --> 00:31:17.160
 board's recommendations following that up we were scheduled to go to the committee on

00:31:17.160 --> 00:31:22.200
 persons with disabilities in march that was one of the committees that was cancelled as

00:31:22.200 --> 00:31:27.160
 the start of the covid pandemic started so we weren't able to get with them until their

00:31:27.160 --> 00:31:32.640
 next meeting which was july 16th i presented the item to them and they also concurred with

00:31:32.640 --> 00:31:39.400
 the terse board recommendations and they appreciated being part of the process and so next slide

00:31:39.400 --> 00:31:45.080
 so the proposed amendments and i've included both a red line and a clean version of the

00:31:45.080 --> 00:31:50.880
 policy for your consideration would be to amend the interior code improvement section

00:31:50.880 --> 00:31:57.120
 and the on both the project descriptions and the scoring sheet and i have another slide

00:31:57.120 --> 00:32:02.040
 on that in just one second as well as we went through the policy to make administrative

00:32:02.040 --> 00:32:06.560
 updates which included changing the references to the downtown task force to its new name

00:32:06.560 --> 00:32:11.200
 the downtown economic development committee we also updated the contact information and

00:32:11.200 --> 00:32:15.640
 staff references and some of the checklist items that applicants have to go through to

00:32:15.640 --> 00:32:21.000
 make sure that that information stays up to date we also provided little bits of clarification

00:32:21.000 --> 00:32:25.840
 where needed nothing major just making sure that the process was clearly outlined where

00:32:25.840 --> 00:32:30.040
 we had been getting questions and then we just corrected some formatting and grammar

00:32:30.040 --> 00:32:36.040
 issues that came up in the process and if you go to the next slide this is the amendment

00:32:36.040 --> 00:32:41.600
 that this committee specifically recommended back in january which was to add the statements

00:32:41.600 --> 00:32:46.920
 under the interior code improvement section that states and improvements made as required

00:32:46.920 --> 00:32:52.740
 by or in accordance with the americans with disabilities act as amended so it's specifically

00:32:52.740 --> 00:32:59.160
 now listed in the definition as an eligible project type and that is i believe all i have

00:32:59.160 --> 00:33:19.320
 and so we can open it up for discussion like to open up for a discussion or question doesn't

00:33:19.320 --> 00:33:27.160
 look like there's any discussions or questions yeah i think we kind of we made that call

00:33:27.160 --> 00:33:32.840
 at that meeting so it's great seats in there yeah yeah i think for what it's worth i'm

00:33:32.840 --> 00:33:39.720
 good with it and it doesn't seem that this is something

00:33:39.720 --> 00:33:44.400
 that needs to be voted on we do need a motion a recommendation because the policy is adopted

00:33:44.400 --> 00:33:48.720
 by ordinance so we'll be drafting a ordinance to amend the policy and taking that to city

00:33:48.720 --> 00:33:54.360
 council so we would like this board's recommendation to go with that okay would anybody like to

00:33:54.360 --> 00:34:02.680
 make a motion i'll make a motion to approve i'll second

00:34:02.680 --> 00:34:09.880
 so we have a motion and a second i don't see everybody is john still there yeah i'm here

00:34:09.880 --> 00:34:19.800
 oh there you are yeah john i seconded uh second sorry vote yay or nay

00:34:19.800 --> 00:34:39.800
 i vote yay then yay yeah alex yay paul yay yes and i thank you gerard yay elissa yay

00:34:39.800 --> 00:34:47.160
 the right board passes the unanimous vote yes and we will be bringing that forward to city

00:34:47.160 --> 00:34:51.720
 council and we'll make sure to update the board once that gets adopted by city council

00:34:51.720 --> 00:35:02.120
 great thank you that takes us to 1d correct receive a report hold a discussion and give

00:35:02.120 --> 00:35:08.600
 staff direction regarding the fiscal year 2020 2021 downtown denton tax increment refinancing

00:35:08.600 --> 00:35:15.160
 zone number one budget yes it's that time of year again that we are going to be discussing

00:35:15.160 --> 00:35:22.120
 budgets and so prior to the city manager's start of budget excuse me prior to the start

00:35:22.120 --> 00:35:25.880
 of the presentations and the city manager's presentation in the next few weeks to city

00:35:25.880 --> 00:35:31.640
 council we wanted to bring the terz board um budget item forward so i'm going to turn

00:35:31.640 --> 00:35:35.800
 it over to nick vincent nick is our assistant director of finance who is going to present

00:35:35.800 --> 00:35:48.760
 this item thank you jessica can everybody see the presentation no okay

00:35:48.760 --> 00:36:05.320
 okay can you see that yes perfect so as jessica said i'm nick vincent

00:36:05.320 --> 00:36:11.000
 assistant director of finance i have a brief presentation to review the 2021 proposed downtown

00:36:11.000 --> 00:36:16.920
 terz budget with you um chair if it's okay there's only two two or three slides if we

00:36:16.920 --> 00:36:20.120
 could get through the presentation ask questions if that's okay with you

00:36:20.120 --> 00:36:30.760
 so this slide summarizes the adopted 1920 budget you can see it here in this column so the terz

00:36:30.760 --> 00:36:38.280
 fund currently has 739 000 in revenue we currently have 150 000 in expenses in the current budget

00:36:38.280 --> 00:36:42.520
 and we are forecasting both of those to be at budget ending this fiscal year

00:36:42.520 --> 00:36:49.240
 and you can see the preliminary 2021 budget we are forecasting 801 000 in revenue for the

00:36:49.240 --> 00:36:56.040
 downtown terz fund and then we have 100 000 in expenses forecasted a couple things i want to

00:36:56.040 --> 00:37:01.960
 review with you so the 2021 revenue assumptions you can see the base value for the terz fund

00:37:01.960 --> 00:37:08.360
 and i'll review with you on the next slide of 79.3 million we are currently forecasting the 2020

00:37:08.360 --> 00:37:14.760
 value for the terz fund to come in at 227.3 million and this currently assumes an eight percent growth

00:37:14.760 --> 00:37:21.240
 in assessed values in the city of denton we will receive certified estimates this coming friday

00:37:21.880 --> 00:37:25.960
 and this year is a little bit different than previous years we will not actually get a certified

00:37:25.960 --> 00:37:31.640
 total the 24th of july this year we'll actually get certified estimates so we'll continue to keep

00:37:31.640 --> 00:37:37.080
 the downtown terz board updated as we progress through the budgeting cycle circle back with you

00:37:37.080 --> 00:37:41.320
 in august or september with the updated values but for the time being we currently have an eight

00:37:41.320 --> 00:37:47.320
 percent increase in assessed values plugged in as you can see the estimated revenues as i've

00:37:47.320 --> 00:37:53.320
 reviewed up in the table is 801 000 uh we do use 95 percent of the incremental value above the base

00:37:53.320 --> 00:38:01.080
 value um so basically the difference between the 227 and the 79.3 million represents 148 million

00:38:01.080 --> 00:38:09.800
 dollars of growth um 95 percent of that value is 140.6 million and then the 2021 expenses we do have

00:38:09.800 --> 00:38:18.360
 a hundred thousand dollars in grant reimbursement plugged into the budget this is the table we show

00:38:18.360 --> 00:38:23.160
 each year when we're presenting the downtown terz budget and you can see in 2010 when that initial

00:38:23.160 --> 00:38:29.880
 value was established at 79.4 million and you can see that value here and you can see the forecasted

00:38:29.880 --> 00:38:36.680
 value that's revert reviewed with you on the previous slide of 227.37 million so you can see

00:38:36.680 --> 00:38:43.000
 over this 10 year period the terz district has increased in value and of course you can see the

00:38:43.000 --> 00:38:53.800
 forecasted revenue down here at the bottom of 801 000 so next steps we are looking for direction

00:38:53.800 --> 00:39:00.520
 today from the terz board the denton cad will release certified estimates this friday the 24th

00:39:00.520 --> 00:39:05.960
 we get estimates for the entire city so assessed values the downtown area in the city of denton so

00:39:05.960 --> 00:39:10.680
 for the terz district and then the proposed budget the city manager's budget as jessica

00:39:10.680 --> 00:39:14.440
 had mentioned is going to be presented to the city council on august the sixth

00:39:14.440 --> 00:39:23.160
 and that concludes the presentation and i will pull it down really quick to allow for questions

00:39:31.880 --> 00:39:40.120
 okay i have a question yes sir do the certified estimates consider um property

00:39:40.120 --> 00:39:48.280
 owners um contesting their tax bills is this considered after that or could it be adjusted

00:39:48.280 --> 00:39:54.200
 after people are contesting uh that's a great question uh so the certified estimate can be

00:39:54.200 --> 00:40:01.160
 adjusted after this coming friday and there could possible possibility be a property still in protest

00:40:01.160 --> 00:40:06.760
 so uh there is some uncertainty with it until we get those certified totals which this year we won't

00:40:06.760 --> 00:40:11.400
 actually receive certified totals in september um so we'll get those in september and circle back

00:40:11.400 --> 00:40:16.680
 with the terz board and city council once we get them but we will be working off certified estimates

00:40:16.680 --> 00:40:22.120
 coming this friday and as we have those budget discussions the city council in august one other

00:40:22.120 --> 00:40:29.960
 question um thank you one other question where are we at um the consulting firm and bringing

00:40:29.960 --> 00:40:36.280
 together a proposal for what we've been talking about as far as a larger game plan i don't know

00:40:36.280 --> 00:40:42.600
 if we want to dive into this here but it certainly seems to fit the budget talk um we had a presentation

00:40:42.600 --> 00:40:49.240
 from a gentleman you know six months ago what is the status right now sure so like many things it

00:40:49.240 --> 00:40:56.040
 got delayed due to the covid pandemic as staff staff had to shift um on some other high priority

00:40:56.040 --> 00:41:02.520
 items but we have resumed the study and we intend to bring it back as soon as it gets completed

00:41:02.520 --> 00:41:07.080
 we're missing i would say maybe five to ten percent of the data we need to finish it up

00:41:07.080 --> 00:41:10.840
 and then bring it back so our intention is it will be back to the board very quickly

00:41:10.840 --> 00:41:19.640
 and is the payment for that consultant coming from the general fund yes this was not paid out

00:41:19.640 --> 00:41:27.240
 of terse funds that's correct that's all i've got any other questions or discussion

00:41:27.240 --> 00:41:36.200
 okay

00:41:45.560 --> 00:41:52.520
 jessica yes you had some input no no no i was just telling you you were muted okay thank you

00:41:52.520 --> 00:42:01.000
 so we'll look for a motion about the budget as presented

00:42:06.040 --> 00:42:15.720
 i guess motion to accept it do we have a second i'll second it okay moved and seconded that we

00:42:15.720 --> 00:42:23.240
 accept the budget as presented by nick all those in favor well not all those in favor so go around

00:42:23.240 --> 00:42:35.080
 a horn to get a yay or nay or yes or no john yes then yes alex yes paul i

00:42:36.360 --> 00:42:40.280
 jeward yes alissa yes

00:42:40.280 --> 00:42:52.520
 so the it is uh the motion passes by unanimous vote yes so nick will build that into the

00:42:52.520 --> 00:42:56.680
 recommended budget that will be taken to city council and we'll keep you updated on that

00:42:56.680 --> 00:43:02.200
 process as you know the budget must be adopted by city council so we will come back to you if we

00:43:02.200 --> 00:43:06.120
 have any changes thank you thank you

00:43:06.120 --> 00:43:15.800
 next order of businesses to receive staff activity report where we will also discuss the next meeting

00:43:15.800 --> 00:43:22.600
 date and we'll invite christina back for that one

00:43:25.720 --> 00:43:33.160
 for staff reports openings we have a dentin sports crowd practic they're located in the

00:43:33.160 --> 00:43:38.920
 in a shared building that will also have a call center which will be really interesting for us

00:43:38.920 --> 00:43:47.560
 at 235 west hickory red's yard is open at 410 north bell they advertise that they specialize

00:43:47.560 --> 00:43:52.840
 in eating drinking and chilling out with yard games and picnic tables out on their open spaced

00:43:52.840 --> 00:43:59.640
 area cookie crave is down south locust and they will bring you warm cookies and ice cream or milk

00:43:59.640 --> 00:44:05.960
 until 3 a.m so if you get a craving you can give them a call salon indigo and vinyl lounge have

00:44:05.960 --> 00:44:13.160
 both opened down in the former dentin record chronicle building and so they have some

00:44:13.160 --> 00:44:19.400
 really great services there vinyl lounge is serving up some groovy tunes and cool cocktails

00:44:19.400 --> 00:44:24.120
 so if you get thirsty and want to listen to some records you're you're all set and three wishes

00:44:24.120 --> 00:44:30.280
 also opened in the former market on oak space on 108 west oak and they have home decor and

00:44:30.280 --> 00:44:35.880
 collectibles on our closings we have we do have a good list of closings we have the market on oak

00:44:35.880 --> 00:44:43.400
 which is at 108 west oak nift which was a secondhand clothing it was at north austin street

00:44:44.200 --> 00:44:51.480
 scrap is now closed freaks and geeks source gaming lounge cryptozoology escape in the square

00:44:51.480 --> 00:44:59.240
 mad world records denton trading wine squared and juice lab so the last two are are closing

00:44:59.240 --> 00:45:05.880
 up at the end of the month but they are they're on the way moving we look forward to seeing h2o

00:45:05.880 --> 00:45:13.240
 open soon caskies which is on 311 north elm and then more fun toys is planning to move into the

00:45:13.240 --> 00:45:21.240
 former mad records location so that'll be nice to have a toy store on the out on the square

00:45:21.240 --> 00:45:27.320
 since you do review grants i do have a couple updates for you on the grants the 109 west

00:45:27.320 --> 00:45:34.360
 walnut for the movement lab he opened right as soon as covet allowed so he's opened there and

00:45:34.360 --> 00:45:41.240
 processed and then went by 104 west mckinney this morning which is chai dow's location it looks to be

00:45:41.240 --> 00:45:45.960
 completed in there but i haven't heard anything from him but i'll be checking up on him to see

00:45:45.960 --> 00:45:53.240
 how how far along he is or if he's ready to to close out his grant as well the next meeting date

00:45:53.240 --> 00:46:01.880
 i have listed for us is september 23rd so any questions i think on the meeting date we were

00:46:01.880 --> 00:46:11.880
 trying to capture the uh consultant report yes so our discussion with the consultant has been that

00:46:11.880 --> 00:46:18.520
 that's our goal um but if we finish early we may ask the terse board if you would like to call a

00:46:18.520 --> 00:46:25.080
 special called meeting um prior to that september date since that's pretty far away but we'll get

00:46:25.080 --> 00:46:29.240
 back with you on that we'll just keep that date since that one's set and then if we need to get

00:46:29.240 --> 00:46:36.120
 back together early i'll send out a note to everyone and get your availability great okay

00:46:36.120 --> 00:46:39.560
 christine is that all

00:46:39.560 --> 00:46:43.640
 yes okay that's all

00:46:43.640 --> 00:46:51.240
 the final order of business is concluding items is there any other business to discuss

00:46:56.200 --> 00:47:07.400
 wow if there's no other business the regular meeting is adjourned at 12 53 pm thank you