1 00:00:00,000 --> 00:00:11,260 All right. Welcome to the July Economic Development Partnership Board meeting. It is 1114 a.m. 2 00:00:11,260 --> 00:00:16,580 My name is Marty Rivers. I want to go ahead and call the meeting to order. And our first 3 00:00:16,580 --> 00:00:24,620 item up for consideration is to consider approval of the minutes from our June 24th, 2020 meeting. 4 00:00:24,620 --> 00:00:33,000 And I would open the floor for any nominations or comments. 5 00:00:33,000 --> 00:00:37,680 Hey Marty, it's Tony. I'll move for approval. 6 00:00:37,680 --> 00:00:44,080 We've got a motion. I'd like to second. 7 00:00:44,080 --> 00:00:45,640 Jill Jester, second. 8 00:00:45,640 --> 00:00:52,120 All right. We have a motion from Tony, a second from Jill. I'm going to ask for any 9 00:00:52,120 --> 00:00:54,720 comments or questions. 10 00:00:54,720 --> 00:01:03,240 All right. Hearing none, I will go around the room and ask for you to say aye or nay, 11 00:01:03,240 --> 00:01:12,120 I guess, if you're opposed. And so get ready to turn your mute off. And Chris, you're first 12 00:01:12,120 --> 00:01:16,240 on my screen here. 13 00:01:16,240 --> 00:01:18,280 Tony? 14 00:01:18,280 --> 00:01:20,360 Aye. 15 00:01:20,360 --> 00:01:22,360 Jesse? 16 00:01:22,360 --> 00:01:24,360 Aye. 17 00:01:24,360 --> 00:01:26,480 Mark? 18 00:01:26,480 --> 00:01:28,480 Aye. 19 00:01:28,480 --> 00:01:30,480 Jill? 20 00:01:30,480 --> 00:01:32,480 Aye. 21 00:01:32,480 --> 00:01:39,240 And I'm an aye myself. So we have a unanimous vote for approval of the minutes. Thank you 22 00:01:39,240 --> 00:01:50,280 so much. And our next item up for consideration is EDP 20-015. Receive a report. Hold the 23 00:01:50,280 --> 00:01:59,920 discussion and give staff direction regarding an incentive application for a team of defenders. 24 00:01:59,920 --> 00:02:04,520 Good morning, everyone. Jessica Rogers, Director of Economic Development. I am going to turn 25 00:02:04,520 --> 00:02:10,400 it over to Erica Sullivan to do the formal staff presentation today. She's giving me 26 00:02:10,400 --> 00:02:16,300 a break, very much appreciated on this one. But I will let you know we do have Mark Sierra 27 00:02:16,300 --> 00:02:21,360 and Nathan Wright with us. And they are the representatives from team of defenders. So 28 00:02:21,360 --> 00:02:26,720 as we get through the presentation, we'll certainly have Mark and Nathan as well as 29 00:02:26,720 --> 00:02:48,960 staff available for questions. And with that, I will turn it over to Erica. 30 00:02:48,960 --> 00:03:14,520 Okay. Got it. I didn't have to talk last time. 31 00:03:14,520 --> 00:03:18,640 Good morning. I'm going to be presenting an incentive application from team of defenders 32 00:03:18,640 --> 00:03:22,360 and my name is Erica Sullivan and I'm the economic development analyst here at the city 33 00:03:22,360 --> 00:03:30,240 of Denton. The objective of this presentation is to provide information on the team of defenders, 34 00:03:30,240 --> 00:03:35,380 provide some background on a tech entrepreneurship initiative that we are working on and consider 35 00:03:35,380 --> 00:03:43,480 possible incentive packages. Team of defenders founded in 2018 is an IT platform technology 36 00:03:43,480 --> 00:03:48,840 and service delivery company. They are focused on innovation, research and development and 37 00:03:48,840 --> 00:03:54,020 deployment. They currently have office space in Stoke but outgrowing their current space 38 00:03:54,020 --> 00:03:58,360 and they are poised for growth or in the process of expanding their hub company through offshoot 39 00:03:58,360 --> 00:04:04,800 spoke companies. And they're using existing talent pipelines for their current and future 40 00:04:04,800 --> 00:04:13,160 staffing needs. Team of defenders is currently seeking investment from private equity investment 41 00:04:13,160 --> 00:04:17,880 banks and angel investors. They are projecting rapid growth in value, revenue, customers 42 00:04:17,880 --> 00:04:27,120 and employees. One Stoke company storage defender, a smart unit for storage is projected to be 43 00:04:27,120 --> 00:04:34,800 in more than 2,500 facilities by 2023. And they have the ability to apply this technology 44 00:04:34,800 --> 00:04:42,720 in other areas such as a boat and RV, smart unit storage as well. And they are rapidly 45 00:04:42,720 --> 00:04:51,640 adding different spoke companies as they move along. About one per year. The goals of the 46 00:04:51,640 --> 00:04:55,760 company are to reduce funding needed from investors to keep more of the company ownership 47 00:04:55,760 --> 00:05:02,080 local. And the reimbursement of costs is needed to relocate offices to secure a larger facility, 48 00:05:02,080 --> 00:05:06,600 recruit and add additional staff, purchase furniture, fixtures and equipment and make 49 00:05:06,600 --> 00:05:15,640 any necessary fiber infrastructure upgrades. Before we move forward, I wanted to provide 50 00:05:15,640 --> 00:05:22,040 a little background since we don't normally look at an application like this. Staff has 51 00:05:22,040 --> 00:05:27,480 met with team of defenders to understand their needs and their business goals. We've researched 52 00:05:27,480 --> 00:05:32,520 similar entrepreneurship, technology and innovation based incentives as well as job based incentives 53 00:05:32,520 --> 00:05:37,440 being used across the country. We've attended entrepreneurship, economic development support 54 00:05:37,440 --> 00:05:41,320 and building successful ecosystem training. You can see some of the ecosystems in our 55 00:05:41,320 --> 00:05:47,680 new strategic plan, our proposed plan. And this has all led to building an entrepreneurship 56 00:05:47,680 --> 00:05:54,760 tech based program around our existing policy and funding mechanisms. So we created an application 57 00:05:54,760 --> 00:05:59,720 in the early part of this year and then we received our first two tech incentive applicants 58 00:05:59,720 --> 00:06:04,080 shortly thereafter. We were going to bring these items forward in March, but were delayed 59 00:06:04,080 --> 00:06:12,440 due to COVID and we're moving forward now. The incentive policy has a number of provisions. 60 00:06:12,440 --> 00:06:18,360 I'm going to briefly go over how this project meets some of these. One of them is diversifying 61 00:06:18,360 --> 00:06:23,840 the tax base, creating quality jobs. In our current policy, we have targeted industry 62 00:06:23,840 --> 00:06:29,180 sectors and this particular application meets to the research and development and the information 63 00:06:29,180 --> 00:06:36,040 technology. In our incentive policy, we have also identified priority considerations that 64 00:06:36,040 --> 00:06:42,360 we will look at and this application meets eight of the 10. Talking about committee investment, 65 00:06:42,360 --> 00:06:47,400 diversifying the tax base, promoting public private partnerships, increasing high wage, 66 00:06:47,400 --> 00:06:53,240 high paid and knowledge based jobs and encouraging startup and small innovation to promote entrepreneurship 67 00:06:53,240 --> 00:07:00,800 and innovation. Under our policy, we also have five programs under chapter 380 grants and 68 00:07:00,800 --> 00:07:08,240 loans and this particular application supports for those. Again, the industry sector directly 69 00:07:08,240 --> 00:07:14,480 with startup and small business to promote entrepreneurship, also for infrastructure, 70 00:07:14,480 --> 00:07:20,680 fiber in this case typically, and then increasing the percentage of jobs paying $75,000 or more 71 00:07:20,680 --> 00:07:27,160 per year. In our policy, we also have additional or other considerations and this application 72 00:07:27,160 --> 00:07:37,960 meets three, including job based grants. The economic development investment fund was 73 00:07:37,960 --> 00:07:44,480 created in 2016 and this program gave us a cash grant. It's paid for by mixed beverage 74 00:07:44,480 --> 00:07:50,080 of $150,000 per year that's put into this fund and this allows us to be more competitive 75 00:07:50,080 --> 00:07:56,000 with other projects. It's geared towards high wage. It's also geared towards investment 76 00:07:56,000 --> 00:08:01,820 and target industries. To be eligible, a company must meet two or three criteria, higher wage 77 00:08:01,820 --> 00:08:08,160 or knowledge based jobs. In this case, $55,000 or greater wage for all of the employees or 78 00:08:08,160 --> 00:08:16,680 25% making $65,000 or more. Substantial capital investment, $15 million in this case and then 79 00:08:16,680 --> 00:08:25,520 recruitment of industry sector targets. This is the innovation in R&D. You can see the 80 00:08:25,520 --> 00:08:31,360 jobs from the application over a five-year period and then summarized it a 10-year period. 81 00:08:31,360 --> 00:08:35,800 When we look at economic development, we usually look about over a 10-year period. The current 82 00:08:35,800 --> 00:08:40,200 employees are two, but we've just been informed that they hired an additional employee during 83 00:08:40,200 --> 00:08:46,680 COVID which is good news. You can see the new employees added through years and then 84 00:08:46,680 --> 00:08:51,200 the cumulative jobs of the employees added including the current jobs for a total of 85 00:08:51,200 --> 00:09:02,840 56. You can see the jobs paying $65,000 or more and then you can see which is a 30 and 86 00:09:02,840 --> 00:09:09,320 then you can see the jobs paying $75,000 or more. To give you an idea, one of the last 87 00:09:09,320 --> 00:09:15,920 grants that we looked at was Tyson and Tyson had 100 jobs and they had 13 making over $65,000 88 00:09:15,920 --> 00:09:25,320 or more. In this table, you can see the wage information, the payroll, the weighted average 89 00:09:25,320 --> 00:09:34,840 annual wage. All the salaries are over the Denton County average wage of $45,900. You 90 00:09:34,840 --> 00:09:40,480 can see the new, all and incentivized and the payroll as well. To give you another comparison 91 00:09:40,480 --> 00:09:46,440 again using Tyson, Tyson for their 100 employees had a payroll of $5.1 million. If you look 92 00:09:46,440 --> 00:09:53,560 at all the 56 jobs, this particular project, Team of Defenders, is almost $4 million and 93 00:09:53,560 --> 00:10:03,000 it's about half the jobs at 56. The incentive proposal is performance based and it's a business 94 00:10:03,000 --> 00:10:08,800 expansion incentive and it combines two main components. The first component is an expansion 95 00:10:08,800 --> 00:10:14,400 grant to reimburse relocation cost, fund additional equipment, make necessary upgrades, site finish 96 00:10:14,400 --> 00:10:19,720 out and any incremental increases in rental costs from the larger facility and this is 97 00:10:19,720 --> 00:10:26,040 all based on demonstrated reimbursed cost. The second component is a stratified job based 98 00:10:26,040 --> 00:10:31,840 incentive and this is into four categories and then we are also giving additional consideration 99 00:10:31,840 --> 00:10:36,360 for employees living in Denton because we definitely want to encourage that. This will 100 00:10:36,360 --> 00:10:41,200 be done via chapter 380 agreement and the economic development investment fund that 101 00:10:41,200 --> 00:10:45,160 we discussed would be the source of funds for this and then the agreement would also 102 00:10:45,160 --> 00:10:53,480 include a term and a cap on the funding amounts. Here's a table of what we are proposing. You 103 00:10:53,480 --> 00:10:59,640 can see there are five years and then they accelerated to 10 and I'll explain that further. 104 00:10:59,640 --> 00:11:04,160 Because it's a job based grant, we really didn't want to go over five years. The first 105 00:11:04,160 --> 00:11:10,040 item you'll see here is a one-time expansion grant that we discussed and this is $50,000. 106 00:11:10,040 --> 00:11:14,480 The second component is the job based grant and this will be stratified from $500,000 107 00:11:14,480 --> 00:11:22,280 to $5,000 reimbursement for salaries greater than $65,000 to $100,000 in the four categories. 108 00:11:22,280 --> 00:11:28,960 Then we also include a bonus for Denton residency hiring local residents and then you'll see 109 00:11:28,960 --> 00:11:33,320 this accelerated option. We do our analysis on 10 years and our applications based on 110 00:11:33,320 --> 00:11:39,360 10 years and we wanted to give them the opportunity to accelerate and hire additional jobs within 111 00:11:39,360 --> 00:11:44,560 the five-year term. So we estimate the total as the five years to be $80,000 but we are 112 00:11:44,560 --> 00:11:52,840 actually giving it a cap of $106,000 if they accelerate. Some of the qualitative benefits, 113 00:11:52,840 --> 00:11:58,360 I wanted to highlight those. The economic impacts. Typically what we invest in or have 114 00:11:58,360 --> 00:12:04,600 invested in in the past is capital, very large facility projects and equipment and this time 115 00:12:04,600 --> 00:12:09,440 we're going to be investing in human capital and quality jobs. And this goes along with 116 00:12:09,440 --> 00:12:13,440 the pipeline for university training programs and the reduction of brain drain, keeping 117 00:12:13,440 --> 00:12:20,800 our people here. This also is a benefit by keeping a Denton startup, by retaining a local 118 00:12:20,800 --> 00:12:26,600 company, fostering entrepreneurship, diversifying the tax base, development of an economic system 119 00:12:26,600 --> 00:12:31,480 that supports entrepreneurship and locally owned businesses. And then finally the fiscal 120 00:12:31,480 --> 00:12:36,120 impact would be less demand on our utility services and infrastructure because it's not 121 00:12:36,120 --> 00:12:44,640 a capital heavy project. Some of the quantitative benefits are the economic impacts. The direct 122 00:12:44,640 --> 00:12:50,640 impact of jobs created by the event would be $54,000, $56,000 with the current and with 123 00:12:50,640 --> 00:12:57,560 the average wage is $68,959. The ripple effects which include induced and indirect impact 124 00:12:57,560 --> 00:13:05,120 add another 81.8 jobs with an average wage of $36,254. Property tax, sales tax, utility 125 00:13:05,120 --> 00:13:09,040 system revenue generated by the projects and other benefit as well as the attraction of 126 00:13:09,040 --> 00:13:13,920 venture capital and investors. Some of the fiscal impacts is the cost to provide government 127 00:13:13,920 --> 00:13:20,480 and utility services is low. And then a return on investment using our impact model is $22.2. 128 00:13:20,480 --> 00:13:28,480 Our summary and recommendation is again a five year performance based incentive with 129 00:13:28,480 --> 00:13:35,600 a total not to exceed 106,500. This involves the expansion grant, which is a reimbursement 130 00:13:35,600 --> 00:13:41,960 of actual costs, a stratified job grant in those four categories for a total of 29,500, 131 00:13:41,960 --> 00:13:49,200 a possible residency bonus of 500 per employee up to 27,000 if the jobs are accelerated and 132 00:13:49,200 --> 00:13:55,440 then we will be verifying this on the IRS form 9-4-1 and the chapter 3D agreement is 133 00:13:55,440 --> 00:14:02,920 to be funded by the economic development investment fund. The options and recommendations, the 134 00:14:02,920 --> 00:14:08,800 board could approve the staff recommendation, could modify or create a new incentive recommendation 135 00:14:08,800 --> 00:14:19,760 or have a no incentive offer recommendation. And I'd be happy to entertain questions. 136 00:14:19,760 --> 00:14:24,880 Thank you, Erica. That's a good job. Sorry, I got knocked off the computer there for a 137 00:14:24,880 --> 00:14:39,800 second. Anybody have any questions? Raise your hand if you would like to speak. I'm 138 00:14:39,800 --> 00:14:44,920 going to ask some questions while you guys are thinking up your questions. Jill, I did 139 00:14:44,920 --> 00:14:54,500 see your hand raised there. On the $50,000 initial grant that's for some of the infrastructure, 140 00:14:54,500 --> 00:15:01,080 do they install that and we reimburse them? Is that a reimbursement grant? Yes, that will 141 00:15:01,080 --> 00:15:09,720 be a reimbursement grant. And is that limited to certain items? Is that furniture, fixtures, 142 00:15:09,720 --> 00:15:25,520 equipment? We have, let's see, I may have gone too far back. Okay, so relocation costs, 143 00:15:25,520 --> 00:15:29,320 fund additional equipment, which would be your furniture, fixtures and equipment. They 144 00:15:29,320 --> 00:15:36,360 could make necessary site upgrades, finish out even incremental increase in rental costs 145 00:15:36,360 --> 00:15:44,720 for the new larger facility, but these would be actual costs. So it would be reimbursement. 146 00:15:44,720 --> 00:15:57,200 And I'm sure this is going to be our next Amazon type business. But what happens if 147 00:15:57,200 --> 00:16:01,880 on the other items, they don't get any of the funds unless they perform this case, they 148 00:16:01,880 --> 00:16:11,160 could, we could, and I'm not, no offense, Mark and you guys, but if they're not in business 149 00:16:11,160 --> 00:16:19,480 in a year, we've spent $50,000 on moving costs and help somebody finish out an office in 150 00:16:19,480 --> 00:16:26,000 somebody's building somewhere. Is there any free course, I guess, or any way that the 151 00:16:26,000 --> 00:16:32,840 city didn't, didn't just out $50,000? In the contract phase, we would have a recapture 152 00:16:32,840 --> 00:16:38,000 provision where we could recapture typically a portion, like maybe 50%, but it could be 153 00:16:38,000 --> 00:16:45,720 negotiated at that time. Okay. In a scenario where we do this with any company though, 154 00:16:45,720 --> 00:16:50,940 I guess if something, if they were out of business, their likelihood of recapturing 155 00:16:50,940 --> 00:17:02,100 any funds would not be very high. And while I've got the floor, I know Jill's out there 156 00:17:02,100 --> 00:17:11,000 waiting on the occupancy, I guess on the employees that live in Denton, is that tested every 157 00:17:11,000 --> 00:17:14,440 year or is that tested one time? How does that work? 158 00:17:14,440 --> 00:17:22,800 That would be done on an annual basis. All right. Jill had a question. 159 00:17:22,800 --> 00:17:28,040 Thank you. One of my questions got answered. So thank you for your very good question, 160 00:17:28,040 --> 00:17:33,880 Marty. And with that, I would like to hear from the applicants. First of all, we appreciate 161 00:17:33,880 --> 00:17:38,960 you doing business here in Denton and thank you for coming before us today and spending 162 00:17:38,960 --> 00:17:45,440 time. I see the connections with UNT, but since we have you, can you talk to me about 163 00:17:45,440 --> 00:17:52,160 why you've decided to expand here in Denton and speak a little bit to the community involvement 164 00:17:52,160 --> 00:17:56,600 in your planned community involvement? Sure. Absolutely. Thanks for the question. 165 00:17:56,600 --> 00:18:01,560 And all thanks for the opportunity here to come and make this proposal. I also thank 166 00:18:01,560 --> 00:18:04,840 Jessica and Erica. We've been working with them for a while and they really dug in. It's 167 00:18:04,840 --> 00:18:09,920 nice hearing you talk about our business, Erica. That was wonderful. So the answer, 168 00:18:09,920 --> 00:18:17,200 Jill, is Nathan and I established our first office back in 2018 at Stoke. The reason we 169 00:18:17,200 --> 00:18:23,760 did that is we both, first of all, it resides about halfway between where we live, proximity. 170 00:18:23,760 --> 00:18:28,560 But secondly, we have this belief that Denton offers a very unique, we could have went down 171 00:18:28,560 --> 00:18:33,320 to Deep Ellum, we could have went to Frisco. There's other places that we could have went, 172 00:18:33,320 --> 00:18:39,280 but we like the concept of colliding tech with the creative culture of Denton. And we're 173 00:18:39,280 --> 00:18:44,160 looking to create a competitive advantage with our platforms there. So Nathan and I 174 00:18:44,160 --> 00:18:50,040 are both degree engineers. Nathan is the CTO of our partnership and then I'm on the business 175 00:18:50,040 --> 00:18:56,120 developments that I've moved over. Tech, we've got covered very well, but out in the industry, 176 00:18:56,120 --> 00:19:02,800 your real differentiator is user experience. And so we like being part of the community 177 00:19:02,800 --> 00:19:08,000 because we believe there's more, a more creative, more in touchness with actual people and that's 178 00:19:08,000 --> 00:19:11,800 ultimately it's people, consumers and businesses that are actually purchasing solutions. And 179 00:19:11,800 --> 00:19:18,240 we think we have harnessed that and we continue to do so. That's number one, the culture. 180 00:19:18,240 --> 00:19:24,640 Two is we have leveraged UNT. We've hired, I'm happy to say that we've hired two UNT 181 00:19:24,640 --> 00:19:29,000 grads as interns and made them full-time employees in our software development and we'll continue 182 00:19:29,000 --> 00:19:33,560 to do so while we have not been able to find an established internship program. We've done 183 00:19:33,560 --> 00:19:38,240 pretty good job working with them and finding what we've needed. And the reason for that 184 00:19:38,240 --> 00:19:45,520 is point three is we work with one of the advisors in our company actually is the head 185 00:19:45,520 --> 00:19:52,440 of the, Nathan help me what his title is again. He chairs, he's on the chair of the computer 186 00:19:52,440 --> 00:19:58,240 and engineering and science advisory committee for UNT. So he's an advisor in the company 187 00:19:58,240 --> 00:20:04,400 and we believe working with a first rate university is a great feeder program, but we're also 188 00:20:04,400 --> 00:20:07,800 leveraging, we've talked to some of the professors about some of their technology and how we 189 00:20:07,800 --> 00:20:11,920 might be able to work with them and use that. And then thirdly, we've been highly involved 190 00:20:11,920 --> 00:20:20,000 with UN, NCTC. We love the tech hire grant program. And so I think we have, we're trying 191 00:20:20,000 --> 00:20:25,560 to leverage the local universities. We're trying to leverage, of course, and contribute 192 00:20:25,560 --> 00:20:31,080 to the culture. We've spoken in at Stoke, we're an active member at Stoke and we've 193 00:20:31,080 --> 00:20:34,720 done a lot in the entrepreneurial community. I've done speaking engagements at Stoke and 194 00:20:34,720 --> 00:20:41,720 at UNT. We just feel that Denton is a bit special. And, you know, we think that we can 195 00:20:41,720 --> 00:20:45,560 also potentially be shapers, not only consumers. 196 00:20:45,560 --> 00:20:54,200 Well, thank you. Thank you very much. I'm super glad to have you. My husband's an IT 197 00:20:54,200 --> 00:20:58,140 technician. I know all the possibilities that are out there and I'm sure Texas Women's University 198 00:20:58,140 --> 00:21:04,640 would love to speak to you as well. There is a lot of opportunity there. And as far 199 00:21:04,640 --> 00:21:10,720 as what is the interest in community involvement as far as, you know, giving back to the community, 200 00:21:10,720 --> 00:21:17,960 is there anything in the plan for that? Yeah, I mean, I think with us, I mean, happy 201 00:21:17,960 --> 00:21:23,400 to talk about that. Number one, there's different ways to give. One of the things that we give 202 00:21:23,400 --> 00:21:29,160 is we've hired three people from Denton to work in our company. So we've chosen our 203 00:21:29,160 --> 00:21:35,360 most recent hire was well above the minimum threshold. We hired a top developer in Denton. 204 00:21:35,360 --> 00:21:41,680 So one is to actually employ Denton residents. That's one way we give to the community. Two, 205 00:21:41,680 --> 00:21:48,480 we engage, we do mentoring. We do, you know, like I said, with our interests in STEM and 206 00:21:48,480 --> 00:21:54,440 sciences we've done work with young students. We were supposed to do an engagement with 207 00:21:54,440 --> 00:21:59,520 what's the name of that program, Nathan, for the high school program at UNT, where high 208 00:21:59,520 --> 00:22:04,400 school students go to UNT. I can't think of the name of it. It eludes me where they take 209 00:22:04,400 --> 00:22:11,800 in high school students and we were going to host a TAMS. What was that? TAMS. Yes, 210 00:22:11,800 --> 00:22:15,120 we were talking to some of the students with TAMS and we were going to have a lunch and 211 00:22:15,120 --> 00:22:19,800 learn with them. And again, to talk about tech and to really pour into, you know, the 212 00:22:19,800 --> 00:22:26,400 students. And then aside from that, Nathan and I, on the charitable side, we do have 213 00:22:26,400 --> 00:22:31,720 a portion of our business that we are going to donate a portion of our profit once we 214 00:22:31,720 --> 00:22:37,660 get to profitability to funds that we feel moved to do. And obviously we would expect 215 00:22:37,660 --> 00:22:41,480 that a portion of that would go to the community that we're in. But that's part of our bylaws 216 00:22:41,480 --> 00:22:47,440 and what we've set up as a company. Really great. Thank you so much. You're welcome. 217 00:22:47,440 --> 00:22:54,880 Thanks for the questions, Jill. All right. Anybody else have any questions or comments? 218 00:22:54,880 --> 00:23:03,960 Chris? The initial $50,000 was going to come out of that mixed beverage fund. What would 219 00:23:03,960 --> 00:23:14,360 the balance be in that fund after this project? That'll be a little under $800,000. Okay. 220 00:23:14,360 --> 00:23:33,600 Thank you. $772,780.21. Okay. Any comments? Questions? It's a little bit different than 221 00:23:33,600 --> 00:23:42,560 what we're used to looking at and kind of an exciting opportunity. With no more comments 222 00:23:42,560 --> 00:23:47,120 or questions, I guess I would open it up to the floor. Our job today would then be to 223 00:23:47,120 --> 00:23:55,120 make a recommendation to city council if we so choose. So I would open the floor for any 224 00:23:55,120 --> 00:24:01,240 motions recommendations or comments. Marty, this is Mark. I'm happy to make that 225 00:24:01,240 --> 00:24:08,040 recommendation and the positive to support this. Okay. We have a motion from Mark that 226 00:24:08,040 --> 00:24:16,080 we, I'm going to put words in your mouth, recommend to city council the staff recommendation 227 00:24:16,080 --> 00:24:24,120 for the incentive. Yes. Would anybody like to second that? I'll second that. Jill Jester. 228 00:24:24,120 --> 00:24:32,880 We have a motion and a second. Any further discussion? All right. I'm going to go around 229 00:24:32,880 --> 00:24:56,840 the horn again. Chris. I think that was an aye. Tony. Aye. Jesse. Aye. Steve. Aye. Mark. 230 00:24:56,840 --> 00:25:07,240 Aye. Jill. Aye. And Marty is an aye as well. So we have a unanimous consent. John Baines 231 00:25:07,240 --> 00:25:15,360 joined you during the presentation. John joins us. Did you get enough of that? I did not. 232 00:25:15,360 --> 00:25:21,060 So I'm just going to abstain and allow the majority to vote. Thank you. All right. Thanks 233 00:25:21,060 --> 00:25:27,760 for joining us. I saw that. Sorry, I missed you. Thank you. So motion carries. We'll make 234 00:25:27,760 --> 00:25:34,400 a recommendation to city council and let them take that up there next or whenever that gets 235 00:25:34,400 --> 00:25:40,240 on the agenda. And I want to thank Nathan and Mark for attending today. You're welcome 236 00:25:40,240 --> 00:25:46,120 to stick around and enjoy this wonderful conversation we're having, but certainly understand if 237 00:25:46,120 --> 00:25:57,380 you have other things to do. All right. Our next item is to, I'm not going to read this 238 00:25:57,380 --> 00:26:06,840 whole paragraph, but it's EDP 20-025 and we'll get an update from tip strategies on our strategic 239 00:26:06,840 --> 00:26:14,840 plan that we've been working on. And we'll let Tom and Jacqueline take it from here. 240 00:26:14,840 --> 00:26:27,200 Thanks for being here, guys. You bet. And can everyone see the slide deck? Yeah, we're 241 00:26:27,200 --> 00:26:33,600 going to keep the slide deck pretty brief today so that we allow enough time for any 242 00:26:33,600 --> 00:26:41,920 discussion that they actually want to document itself. But I appreciate the fact that Jacqueline 243 00:26:41,920 --> 00:26:48,840 and I were able to be included at the first part of your meeting to get to hear the incentives 244 00:26:48,840 --> 00:26:57,320 application. We actually couldn't have really scripted it better in terms of fitting within 245 00:26:57,320 --> 00:27:02,880 some of the recommendations that were outlined in the plan and are very encouraged that you 246 00:27:02,880 --> 00:27:07,000 guys are willing to take that step and kind of get outside of some of the traditional 247 00:27:07,000 --> 00:27:14,020 ways of thinking about how you incentivize projects. So that's all good. And if you don't 248 00:27:14,020 --> 00:27:22,480 mind, Erica, do you have the slide deck? Okay. Yeah, if you don't mind, go ahead and advance. 249 00:27:22,480 --> 00:27:28,880 So I'm going to make a brief reintroduction of the concept of the strategic growth areas. 250 00:27:28,880 --> 00:27:35,840 And then I think Chris and a couple of you asked last time if we could gather some information 251 00:27:35,840 --> 00:27:40,840 about what some of the other communities are doing in terms of their sales tax and the 252 00:27:40,840 --> 00:27:45,320 competitive environment. So we did that and we'll talk about that briefly and then talk 253 00:27:45,320 --> 00:27:56,440 about next steps. So the next slide, reminder that the goals accelerating recovery is the 254 00:27:56,440 --> 00:28:02,920 first priority based on the current environment that we're in. Second priority is making sure 255 00:28:02,920 --> 00:28:10,600 that you don't pause on doing economic development. You continue to market the community around 256 00:28:10,600 --> 00:28:18,240 the four different areas that we saw as strategic growth areas. And then the third is that making 257 00:28:18,240 --> 00:28:24,040 sure as you go forward, as you think about economic development, you're thinking of it 258 00:28:24,040 --> 00:28:28,640 not just how do we fill up the business park, but how do we support the universities? How 259 00:28:28,640 --> 00:28:33,640 do we support workforce development? How do we support keeping and attracting talent in 260 00:28:33,640 --> 00:28:42,160 the community? Next slide. So the four, a reminder that four growth areas, the first 261 00:28:42,160 --> 00:28:50,480 one being the most traditional being transportation logistics. That's where attracting, helping 262 00:28:50,480 --> 00:28:55,240 Chris off on Peterbilt, making sure he's got his suppliers, making sure that your business 263 00:28:55,240 --> 00:29:03,160 park is in those that are investing, you know, highly from a capital standpoint, creating 264 00:29:03,160 --> 00:29:10,400 revenue for the community. Creativity, that's where the incentive application you just heard 265 00:29:10,400 --> 00:29:15,480 fits very neatly. Also taking advantage on the sustainability side, the fact that you 266 00:29:15,480 --> 00:29:22,560 guys have your electric utility and sustainability has been a goal for the city for a long time. 267 00:29:22,560 --> 00:29:29,080 And then that fourth box competitiveness is where, you know, the Class A office space 268 00:29:29,080 --> 00:29:35,480 as the coal hunter ranch starts to develop over time, that's where a lot of those strategies 269 00:29:35,480 --> 00:29:42,720 would fit. So each one of these strategic growth areas, and Erica, I'm not going to 270 00:29:42,720 --> 00:29:50,280 spend much time on each one of these, but go ahead to the next one. Connectivity, the 271 00:29:50,280 --> 00:29:56,880 common idea that I'll point out here is this idea that over time you take advantage of 272 00:29:56,880 --> 00:30:03,200 what you have going with UNT and logistics and create a kind of a center of excellence 273 00:30:03,200 --> 00:30:09,040 around that that includes your employers and other assets in the community. Go to the next 274 00:30:09,040 --> 00:30:20,080 slide. Creativity side, I think we've called out EdTech as a particular target for the 275 00:30:20,080 --> 00:30:30,800 region based on your educational assets along with technology growth. The next slide. Sustainability, 276 00:30:30,800 --> 00:30:38,240 I think I mentioned that up front. Having your economic development sort of align with 277 00:30:38,240 --> 00:30:43,920 your sustainable development goals and your current, you know, simply sustainable strategic 278 00:30:43,920 --> 00:30:57,640 plan that the city's been working on. The last, next slide. Competitiveness, as I mentioned 279 00:30:57,640 --> 00:31:01,520 last time, I think I was asked a question about budgeting and really, you know, you 280 00:31:01,520 --> 00:31:10,360 could dedicate one or two staff specifically for the properties along 35 West. Continuing 281 00:31:10,360 --> 00:31:19,240 to promote downtown development, that's one of your biggest assets. And as the gentleman 282 00:31:19,240 --> 00:31:25,920 applying for the incentives mentioned previously, the culture was a big part of their decision 283 00:31:25,920 --> 00:31:32,960 in your downtown, the universities there really capture that culture. And so just making sure 284 00:31:32,960 --> 00:31:40,240 that you pay attention to that. And then professional office space, I don't have a crystal ball 285 00:31:40,240 --> 00:31:49,360 about how this environment is going to play out in terms of the next Class A office spaces 286 00:31:49,360 --> 00:31:55,280 that are built. The guys from Hillwood and others can answer that better than I can. 287 00:31:55,280 --> 00:32:01,460 We're monitoring closely what this means in a COVID environment and as we go forward, 288 00:32:01,460 --> 00:32:04,680 what the demand for office space is going to be and what that's going to look like. 289 00:32:04,680 --> 00:32:11,440 But that still needs to be a part of your areas that you focus on for the long term. 290 00:32:11,440 --> 00:32:19,480 Next slide. So I just have a couple more slides here. As we talked last time, we think that 291 00:32:19,480 --> 00:32:28,800 in order for Denton to remain competitive while the beverage tax, the $150,000 that 292 00:32:28,800 --> 00:32:33,560 you guys are putting into your fund and the $800,000 that you currently have remaining, 293 00:32:33,560 --> 00:32:38,540 as you mentioned Erica, are really important. The competitive environment for you guys in 294 00:32:38,540 --> 00:32:44,480 order to actually embrace the plan that we've helped lay out here is going to require not 295 00:32:44,480 --> 00:32:51,400 only a larger operating budget, but it's going to require what we think of as a catalyst 296 00:32:51,400 --> 00:32:57,520 fund so that the right projects that come along. I don't think, I'll show you some numbers 297 00:32:57,520 --> 00:33:03,200 here in a second, but competing head to head with Frisco is probably not what you're going 298 00:33:03,200 --> 00:33:08,600 to find yourself doing. So you may not need the same cash that they do, but you do need 299 00:33:08,600 --> 00:33:14,560 something that's, that at least gets you to the table for some of these projects. And 300 00:33:14,560 --> 00:33:24,700 so Jacqueline is the next slide. Go ahead, Erica. If you don't mind Jacqueline, maybe 301 00:33:24,700 --> 00:33:34,120 remind folks that we had looked at sales tax and what the numbers look like. 302 00:33:34,120 --> 00:33:40,400 Sure. So we presented this a couple of months ago, but this just gives you a sense of some 303 00:33:40,400 --> 00:33:48,220 surrounding DFW communities who either have type A or type B sales tax they put into an 304 00:33:48,220 --> 00:33:56,420 economic development corporation. So you can see that this sort of EDC structure is commonly 305 00:33:56,420 --> 00:34:02,600 used by other communities to help fund economic development, particularly in the DFW metropolitan. 306 00:34:02,600 --> 00:34:26,000 So they're surrounded by communities dedicated funds to economic development. Next slide. 307 00:34:26,000 --> 00:34:33,120 So this, we pulled some information based off of questions during the last meeting. 308 00:34:33,120 --> 00:34:39,360 This gives you a sense of how much revenue is flowing into those economic development 309 00:34:39,360 --> 00:34:46,760 corporations for a couple of surrounding communities. You kind of get a sense of the amount that, 310 00:34:46,760 --> 00:34:52,340 you know, your, your neighbors are, are devoting to economic development. And then on the right 311 00:34:52,340 --> 00:35:01,080 side, I pulled out a summary from, from the Texas Comptroller about type A, type B, and 312 00:35:01,080 --> 00:35:06,720 what kind of projects can be funded through those just for extra information. But this 313 00:35:06,720 --> 00:35:11,560 gives you a little bit more of a sense of what we're talking about in terms of fund 314 00:35:11,560 --> 00:35:19,040 sizes and kind of amounts that other communities are setting aside for economic development. 315 00:35:19,040 --> 00:35:28,840 Yeah. If you don't mind, Eric, go back to that slide for just a moment. Yeah. And so, 316 00:35:28,840 --> 00:35:33,960 you know, what this doesn't capture is how much some of these communities have in the 317 00:35:33,960 --> 00:35:41,520 bank right now. In other words, these are the actual annual revenues that they bring 318 00:35:41,520 --> 00:35:47,040 in based on the sales tax. And so I don't think it would be too difficult. Typically 319 00:35:47,040 --> 00:35:53,520 the, you know, Frisco, these guys will share with a phone call just what they're currently 320 00:35:53,520 --> 00:36:00,920 sitting on. And many times they'll also share what is obligated out of those revenues based 321 00:36:00,920 --> 00:36:06,560 on current projects. Just because Allen is bringing in 13 and a half million doesn't 322 00:36:06,560 --> 00:36:10,600 mean they have 13 and a half million to spend every year because then they have half of 323 00:36:10,600 --> 00:36:16,440 that or three quarters of that already obligated to specific projects. So really you have to 324 00:36:16,440 --> 00:36:20,040 pay attention to, you know, what is their net in a year and what they have available 325 00:36:20,040 --> 00:36:27,940 to use. But many times they're also, they're also sitting on a significant amount of cash. 326 00:36:27,940 --> 00:36:35,720 So just give you an idea of what's out there right now. Marty, can I ask a quick question 327 00:36:35,720 --> 00:36:42,640 on this slide? Thank you. Jill Jester. Tom, thank you. This information right here that 328 00:36:42,640 --> 00:36:46,560 we're looking at, I assume that this is public information and that's where it was gathered 329 00:36:46,560 --> 00:36:55,240 from. Yes, the Comptroller reports out what each group, what the revenues are every year. 330 00:36:55,240 --> 00:37:00,180 Okay. I just want to know what information I can share with others and which I can't. 331 00:37:00,180 --> 00:37:08,840 Thank you. So another thing to keep in mind is that EDCs like cities have to have CAFERS 332 00:37:08,840 --> 00:37:16,040 that are publicly adopted by their boards and city councils. So any of their revenues 333 00:37:16,040 --> 00:37:24,880 or funds that they have are publicly available. If you want to read a bunch of CAFERS, Jill. 334 00:37:24,880 --> 00:37:35,360 Marty, I have a quick question. Go ahead. Yeah. So on that chart you guys are looking at, 335 00:37:35,360 --> 00:37:40,440 it shows two different sources of economic development funds. So I'm assuming you would 336 00:37:40,440 --> 00:37:45,220 add those two numbers together and that's the total amount of revenue that each community 337 00:37:45,220 --> 00:37:52,960 that you've noted raises and then the way those funds are distributed kind of are detailed 338 00:37:52,960 --> 00:37:59,200 to the right of that chart. Is that a good way to look at it, Tom? Yeah, those are the 339 00:37:59,200 --> 00:38:10,680 categories that the Comptroller says are how the money can be used from each of those. 340 00:38:10,680 --> 00:38:17,440 There is some flexibility to move money toward different projects one way or the other. You 341 00:38:17,440 --> 00:38:26,800 can take type B money and use it for type A projects. Sometimes the actual election 342 00:38:26,800 --> 00:38:33,800 is required in order to do something or a council vote is required to be able to move 343 00:38:33,800 --> 00:38:40,640 the monies around. But typically type A is... Go ahead, Tom. One thing that's not noted, 344 00:38:40,640 --> 00:38:48,720 I guess we know the percentage of sales tax that they charge for each type. Is that fairly 345 00:38:48,720 --> 00:38:57,280 easy to determine? Yeah, that's also available. They typically range from half a percent down 346 00:38:57,280 --> 00:39:08,440 to an eighth of a percent for each one of them. Yeah, gotcha. Thank you. So the last 347 00:39:08,440 --> 00:39:23,680 slide, Erica. Move ahead. We'll open it up for discussion. So in terms of the process, 348 00:39:23,680 --> 00:39:29,640 I talked to staff this morning. There may be some adjustments and when this would go 349 00:39:29,640 --> 00:39:37,840 before city council, but from working with you guys, our hope is to get feedback from 350 00:39:37,840 --> 00:39:45,680 you about the plan generally, and then begin working. If you guys are good with the structure, 351 00:39:45,680 --> 00:39:55,000 then the next step for us would be to take this and put it into an implementation by 352 00:39:55,000 --> 00:40:06,320 matrix that we would then start filling out timeframes. And then we will also take a look 353 00:40:06,320 --> 00:40:11,880 at how... We've got a couple of other tasks. One would be to take a look at your current 354 00:40:11,880 --> 00:40:19,200 incentives policy and see how that would align with the plan itself and if any adjustments 355 00:40:19,200 --> 00:40:24,000 need to be made. Because one of the things that I noted is, Erica, as you were going 356 00:40:24,000 --> 00:40:32,120 through your incentives policy, the target industries are one of yours. And so for us, 357 00:40:32,120 --> 00:40:36,240 our target industries are structured a little bit differently. And so we would need to maybe 358 00:40:36,240 --> 00:40:42,040 make some adjustments there and a couple of other places. But that's a next step for us. 359 00:40:42,040 --> 00:40:51,280 But really, that's where we are right now. So if you guys, now that you've had a little 360 00:40:51,280 --> 00:40:55,360 more time with the plan, if you have any questions or concerns or things that you think would 361 00:40:55,360 --> 00:40:59,480 be nice to have a little more detail here or there, obviously some of that we'll get 362 00:40:59,480 --> 00:41:05,400 to when we get to the implementation component of this, which would be the next step for 363 00:41:05,400 --> 00:41:08,720 us, if you guys feel like we're on the right track. 364 00:41:08,720 --> 00:41:13,120 Marty, I'll hand it back to you. 365 00:41:13,120 --> 00:41:15,160 All right, Tony. 366 00:41:15,160 --> 00:41:21,920 Yeah. Hey, I would just like to ask Jesse, if he can share with us maybe a little bit 367 00:41:21,920 --> 00:41:29,780 of his thoughts relative to the discussions at the city council level on where you guys 368 00:41:29,780 --> 00:41:35,400 are, because I'm assuming there's been several meetings over the last few months, kind of 369 00:41:35,400 --> 00:41:40,920 the attitude maybe of the city council on this whole project and where it's going and 370 00:41:40,920 --> 00:41:45,160 the funding mechanism and those things, if you could share some of that with us, maybe 371 00:41:45,160 --> 00:41:48,440 some of it is confidential, but curious your thoughts. 372 00:41:48,440 --> 00:41:55,760 Sure. I'll do my best. I have to warn you ahead of time though, I'm going to be, the 373 00:41:55,760 --> 00:42:00,640 answer is probably going to be a little disappointing and vague. I can speak only for myself being 374 00:42:00,640 --> 00:42:07,600 one of seven members. As far as the overall project, I can tell you that there's enthusiasm 375 00:42:07,600 --> 00:42:15,240 on the council for an updated economic development strategy. I know that as these things come 376 00:42:15,240 --> 00:42:22,680 up kind of project by project, we're looking for some additional guidance and a better, 377 00:42:22,680 --> 00:42:27,440 more up-to-date kind of touchstone for what our overall strategy is, so we can better 378 00:42:27,440 --> 00:42:35,600 evaluate individual projects as they come through. As far as a funding mechanism for 379 00:42:35,600 --> 00:42:40,600 an ED fund, I think you would probably find seven different opinions on the best way to 380 00:42:40,600 --> 00:42:46,880 go forward with that. I have my own thoughts. I'll kind of keep those to myself for now 381 00:42:46,880 --> 00:42:53,200 because I do want to hear from my colleagues and really from this group what we think is 382 00:42:53,200 --> 00:42:58,680 most feasible and then also, I don't want to go lean real heavy into one strategy and 383 00:42:58,680 --> 00:43:04,560 then find out from city staff and the council meets that my bright idea is patently illegal 384 00:43:04,560 --> 00:43:11,280 or fiscally irresponsible or whatever, so I can tell you the council would like to hear 385 00:43:11,280 --> 00:43:18,160 from this group in a recommendation on this strategy and this plan where you want us to 386 00:43:18,160 --> 00:43:24,720 lean in and where you think it needs to lean in and how aggressive we need to be. I personally, 387 00:43:24,720 --> 00:43:28,160 y'all know this already, I personally think we need to be aggressive about funding an 388 00:43:28,160 --> 00:43:33,600 ED fund, and if this group feels the same way, I think the council needs to hear you 389 00:43:33,600 --> 00:43:38,520 on that. If you want to be a little more cautious or less aggressive, then we need to hear that 390 00:43:38,520 --> 00:43:39,520 also. 391 00:43:39,520 --> 00:43:42,400 Thank you. That's fair. Thank you for that. 392 00:43:42,400 --> 00:43:48,880 Good question. I think the overriding consensus, if I could speak for everybody over the years, 393 00:43:48,880 --> 00:43:54,400 is that we want more money to do more things with and then how we get there has always 394 00:43:54,400 --> 00:44:03,920 been the challenging part of it, so we're capped at, we can't, this may be preaching 395 00:44:03,920 --> 00:44:09,200 to the choir, but we can't go add anything more to our sales tax collection because we're 396 00:44:09,200 --> 00:44:20,160 spending the money on DCTA, and so we're having to use what we can. The DME suggestion is 397 00:44:20,160 --> 00:44:27,360 another alternative way of getting there as well, so probably whatever is the best way 398 00:44:27,360 --> 00:44:34,280 for council to think about how to get some funds, but we're way behind the curve compared 399 00:44:34,280 --> 00:44:38,520 to what our other cities are doing, and it's pretty sobering to look at that graph and 400 00:44:38,520 --> 00:44:44,560 look at some of our neighbors, how much money that they have to deal with and what they 401 00:44:44,560 --> 00:44:53,960 can do, so good question. Bring that up. Anybody have any other questions or comments? 402 00:44:53,960 --> 00:44:54,960 Chris? 403 00:44:54,960 --> 00:45:04,840 That was part of what I was trying to get at last time was looking at what all the competition 404 00:45:04,840 --> 00:45:08,440 has at their disposal, and I knew what those numbers were going to look like because we've 405 00:45:08,440 --> 00:45:14,760 dealt with many of those cities here in the last few years, and we've expanded into another 406 00:45:14,760 --> 00:45:20,480 part of the Metroplex, but the other question that I had last week is, based on that and 407 00:45:20,480 --> 00:45:25,320 based on the planet that you're working on here, and I really like it, I finally did 408 00:45:25,320 --> 00:45:31,440 get a chance to go through the whole thing. I really think it's pretty solid, but it's 409 00:45:31,440 --> 00:45:35,960 not going to do anything without money. It's going to do nothing without money, and so 410 00:45:35,960 --> 00:45:41,700 I guess the other question was, based on your experience in similar sized cities, in similar 411 00:45:41,700 --> 00:45:47,080 sized competitive markets with cities that have those funds that they do, what should 412 00:45:47,080 --> 00:45:52,520 the debt number be? Forget how it will get there, but before you can put a plan together 413 00:45:52,520 --> 00:45:58,920 to get there, you got to know what there is, so is there $5 million or is there $10 million? 414 00:45:58,920 --> 00:46:06,360 In your assessment, that's got what I was looking for as the second piece. 415 00:46:06,360 --> 00:46:19,000 Yeah, and I think that the $10 million number, if you feel like you want to compete on, especially 416 00:46:19,000 --> 00:46:26,760 when you get into manufacturing companies, let's, for example, Chris, if you guys had 417 00:46:26,760 --> 00:46:32,920 a supplier that was going to create 200 jobs and was going to put in $50 million in equipment 418 00:46:32,920 --> 00:46:40,080 and everything else, in the current environment over the next two years, three years, as you 419 00:46:40,080 --> 00:46:48,600 know, you probably have this money thrown at you too, it's going to be significant, 420 00:46:48,600 --> 00:46:55,520 and that still may not get you in the hunt for a lot of projects, but that's probably 421 00:46:55,520 --> 00:47:03,360 a good number to think about, to stretch you a little bit. In the short term, if you had 422 00:47:03,360 --> 00:47:08,000 an incremental goal, saying, look, we really want to get to a couple of million dollars 423 00:47:08,000 --> 00:47:13,560 in the bank so that we can at least start saying that we have a fund, and if you've 424 00:47:13,560 --> 00:47:19,280 got 800 to start with and you need another 1.2 that you thought the utility could put 425 00:47:19,280 --> 00:47:23,720 some into and that you could rave some from the private sector and maybe there's some 426 00:47:23,720 --> 00:47:31,560 other source out there that we haven't thought of, but having an intermediate goal of getting 427 00:47:31,560 --> 00:47:38,960 $2 million in the bank, but your longer term goal being $10 million. And there are interesting 428 00:47:38,960 --> 00:47:45,320 strategies we've seen communities put together out there, some of the larger ones typically 429 00:47:45,320 --> 00:47:55,600 will call their capital campaign Opportunity Austin, Opportunity Houston, and they will 430 00:47:55,600 --> 00:48:02,520 sometimes tie their fundraising to specific efforts, like if they know that marketing 431 00:48:02,520 --> 00:48:09,640 is something that is harder for the city to raise funds for specifically, depending on 432 00:48:09,640 --> 00:48:14,580 how you're going to do it, that that's a private sector, you know, you end up with some private 433 00:48:14,580 --> 00:48:18,360 sector investors who say, yeah, we know if this is going to be used specifically for 434 00:48:18,360 --> 00:48:23,520 this fund, you know, this part of what we're doing, we're willing to put money in, or if 435 00:48:23,520 --> 00:48:28,520 you're going to fund these types of projects, we'll put money into it. But we're happy to 436 00:48:28,520 --> 00:48:35,400 continue as we get into the implementation discussion, providing, you know, more information 437 00:48:35,400 --> 00:48:39,640 on what some others are doing and how they're doing it. 438 00:48:39,640 --> 00:48:47,080 When you talk about a catalyst fund, that however you get there, is that overseen by 439 00:48:47,080 --> 00:48:55,720 the city? Because you're looking at DME city funds and private funds. Currently, we do 440 00:48:55,720 --> 00:49:01,200 a little different, we have private funds that fund part of our overall marketing budget. 441 00:49:01,200 --> 00:49:09,160 But do you, in this scenario, do private investors, businesses put money into a fund that's then 442 00:49:09,160 --> 00:49:14,960 managed by the city? Or how does that? That seems like that would be challenging. 443 00:49:14,960 --> 00:49:23,360 Yeah, I know, I'll have to do some more research, Marty, on how to best structure in an environment 444 00:49:23,360 --> 00:49:28,360 where you have your utility might be that the funds and the way that they're actually 445 00:49:28,360 --> 00:49:36,200 distributed, have some caveats to account for that. So that if city, city money is going 446 00:49:36,200 --> 00:49:41,480 to be used as part of an investment, then obviously the city is controlling that. 447 00:49:41,480 --> 00:49:50,720 I've also seen, for example, the Greater Houston Partnership, we did a large workforce project 448 00:49:50,720 --> 00:49:57,080 for them that was essentially funded from their capital campaign. And they had investors 449 00:49:57,080 --> 00:50:03,320 who specifically said, I want my funds to go into the talent development part of that. 450 00:50:03,320 --> 00:50:07,000 And so it could be that maybe just get structured that the private sector is going to put up 451 00:50:07,000 --> 00:50:15,640 funds that there are some strings attached to how that gets used. But I know, Charlie, 452 00:50:15,640 --> 00:50:19,280 you've worked with other groups, too, like Round Rock and others, if you've got anything 453 00:50:19,280 --> 00:50:22,280 to add there. 454 00:50:22,280 --> 00:50:32,760 Yes, there's, I mean, there's a number of ways that people have done this. And I think 455 00:50:32,760 --> 00:50:39,800 Tom's right, we probably need to look at what are the what best fits Denton and how it would 456 00:50:39,800 --> 00:50:48,080 operate. But a number of communities do this where, as Tom said, but that money is usually 457 00:50:48,080 --> 00:50:55,920 specified for specific purposes in an overall economic development plan. But I'd be glad 458 00:50:55,920 --> 00:51:03,480 to pull together some of those in conjunction with Tom to bring back to you. 459 00:51:03,480 --> 00:51:10,520 All right. Jill raised her hand. 460 00:51:10,520 --> 00:51:19,640 Well, so as far as the input I have, I have a few points. First, I would say that I think 461 00:51:19,640 --> 00:51:25,320 the philosophy is is on track. I don't think there's any major red flags. In my opinion, 462 00:51:25,320 --> 00:51:29,160 I think you're going to get a consensus that we're in the right direction and let's move 463 00:51:29,160 --> 00:51:33,600 forward. Although COVID-19 has slowed some things down, things are still moving very 464 00:51:33,600 --> 00:51:38,680 fast in the North Texas area. And we certainly don't want to miss out on opportunities that 465 00:51:38,680 --> 00:51:46,760 we might if we slow things down in any way. Second, I would say one of the most helpful 466 00:51:46,760 --> 00:51:52,040 things as well as kind of putting these philosophies together is looking at the real numbers and 467 00:51:52,040 --> 00:51:58,120 comparables. I think it's going to be very helpful for people that maybe have not looked 468 00:51:58,120 --> 00:52:03,920 at the philosophy around economic development to see what our competition is, even within 469 00:52:03,920 --> 00:52:09,240 Denton County, to where they could enjoy some of the culture of Denton, but not necessarily 470 00:52:09,240 --> 00:52:14,440 do business here because of the opportunities that are set up with these type A and type 471 00:52:14,440 --> 00:52:20,760 B funds very close by. So I think some of those and helping us understand what real 472 00:52:20,760 --> 00:52:29,080 numbers are just down the street is incredibly helpful for determining what the next steps 473 00:52:29,080 --> 00:52:35,480 Denton needs to take. I think in order to stay strategic and intentional, we do need 474 00:52:35,480 --> 00:52:40,960 to not take anything off of the table as far as funding for this catalyst fund. So whether 475 00:52:40,960 --> 00:52:48,760 that's the A train, whether that's DME, whether that's private investment, I think everything 476 00:52:48,760 --> 00:52:55,400 should be on the table and open for consideration, understanding what current disadvantage we 477 00:52:55,400 --> 00:53:01,440 are at and competing for the best businesses for our residents and to help sustain our 478 00:53:01,440 --> 00:53:09,640 city. And lastly, I would say that I think the sooner the better, as far as moving forward 479 00:53:09,640 --> 00:53:15,920 or giving you what you need in order to come forward with the implementation matrix, we 480 00:53:15,920 --> 00:53:21,920 as we all know, our contract between the chamber and city regarding economic development has 481 00:53:21,920 --> 00:53:27,680 expired and we are talking about what that is going to look like if that continues, if 482 00:53:27,680 --> 00:53:32,440 it continues, what that's going to look like. And we certainly are relying a lot on all 483 00:53:32,440 --> 00:53:37,280 of this input from all of these different sectors, as well as this report and trying 484 00:53:37,280 --> 00:53:44,000 to determine what is best for the city and who should be doing what. So my vote would 485 00:53:44,000 --> 00:53:49,720 be to, even if you feel like we're jumping the gun, trying to get that matrix together. 486 00:53:49,720 --> 00:53:55,560 I think, like I said, I've not heard a red flag yet as far as what you've put pen to 487 00:53:55,560 --> 00:54:00,720 paper and been able to put in a document as far as where we've been, where we are, and 488 00:54:00,720 --> 00:54:07,000 where we might be able to go and the way we want to go. So I think that the sooner the 489 00:54:07,000 --> 00:54:15,000 better so that we can determine the partnership between the private and the public sector 490 00:54:15,000 --> 00:54:22,400 would be helpful. And I just it's been a real pleasure to be involved in the entire process 491 00:54:22,400 --> 00:54:30,800 and learn more. And just being a part of I truly believe this is of the utmost importance 492 00:54:30,800 --> 00:54:40,080 for the city of Denton. So thank you very much. Thanks, Jill. Any other comments or 493 00:54:40,080 --> 00:54:50,160 questions for Tom? Marty, I did have a question, please. Okay. I'm sorry, gang, to come to 494 00:54:50,160 --> 00:54:55,800 the party a little late, but we've been without email and without internet for two days. And 495 00:54:55,800 --> 00:55:06,520 we put some bubble gum wire and chewing gum together and here I am. So a couple of things. 496 00:55:06,520 --> 00:55:10,120 And I know we're not supposed to speak to people directly, but I'm going to do it as 497 00:55:10,120 --> 00:55:17,480 gently as I can. Councilman Davis, I would like to see, this is my personal feeling, 498 00:55:17,480 --> 00:55:21,840 I'd kind of like to see the council show their hand a little bit. I feel like we're in a 499 00:55:21,840 --> 00:55:30,280 poker game and nobody's showing their hand. As far as kind of what we want to do as far 500 00:55:30,280 --> 00:55:38,680 as an investment. And I'll elaborate a little bit more. Another example. As a young boy, 501 00:55:38,680 --> 00:55:43,520 I lived in a foreign country and I didn't know what to expect there. But when I got 502 00:55:43,520 --> 00:55:49,640 with some experienced people, I was able to travel and enjoy the foreign country because 503 00:55:49,640 --> 00:55:54,760 I was with some experienced people. And I feel like that right now, we need to do something, 504 00:55:54,760 --> 00:56:00,800 but I've never been here before. So I'm relying on the people with experience to tell us how 505 00:56:00,800 --> 00:56:06,520 much money do we need? I need a number on the table and possibly a number one, a number 506 00:56:06,520 --> 00:56:12,200 two and a number three, as far as an option. Choices. This would be our first choice, second 507 00:56:12,200 --> 00:56:18,240 choice, third choice. So I don't know how we integrate that into what we're doing here, 508 00:56:18,240 --> 00:56:24,760 but I kind of like to at least have a ballpark of what we think we need and then develop 509 00:56:24,760 --> 00:56:29,680 a plan to go and get there. Thank you for allowing me to have that input. 510 00:56:29,680 --> 00:56:40,480 >> And Marty, if you don't mind me jumping in. John, I think your points are great. I 511 00:56:40,480 --> 00:56:47,040 don't think it's helpful to ask the city council to brainstorm this. I think that we've got 512 00:56:47,040 --> 00:56:54,600 a lot of talent in this group and what would be more helpful, I think, to lay this issue 513 00:56:54,600 --> 00:56:58,040 out to them and to get their feedback that you're asking for. And I think we all want 514 00:56:58,040 --> 00:57:03,400 that. It's not particularly helpful for me as the city manager to see what other cities 515 00:57:03,400 --> 00:57:08,260 have to work with. I think that we can put together those dollars. I mean, we're limited 516 00:57:08,260 --> 00:57:16,160 by our imagination. Quite frankly, the sales tax from DCTA, it's not coming back to us 517 00:57:16,160 --> 00:57:21,360 right now, so we need to kind of ground ourselves in some reality. And I think, Tom, it would 518 00:57:21,360 --> 00:57:27,280 be helpful to understand, you know, what you see is really necessary to move us forward 519 00:57:27,280 --> 00:57:33,400 the next step or two over the next couple of years. We can certainly put together financing 520 00:57:33,400 --> 00:57:38,400 plans right now for the council to take a look at, but they need to know what they're 521 00:57:38,400 --> 00:57:44,280 debating and why. You know, and I think if we can structure it that way and get it back 522 00:57:44,280 --> 00:57:49,560 in front of this group, just say, look, here's two, three, four different options. What do 523 00:57:49,560 --> 00:57:55,640 you think? You want to recommend some things, as long as it's tied up in strategy and projects. 524 00:57:55,640 --> 00:58:00,680 And you know, I think it gives Jesse and the rest of the council the ability to jump off. 525 00:58:00,680 --> 00:58:07,480 We can solve the money if they want to, but it's just sort of where are you seeing in 526 00:58:07,480 --> 00:58:12,280 the implementation plan that our, you know, first few million dollars need to be spent? 527 00:58:12,280 --> 00:58:16,560 Where are you seeing that we need to have, you know, that capital fund set aside for 528 00:58:16,560 --> 00:58:21,200 opportunities because we can certainly make recommendations to them. And I know that we'll 529 00:58:21,200 --> 00:58:25,760 listen to them, but we need to go to them very specific plan. If we don't, it's really 530 00:58:25,760 --> 00:58:29,760 not fair for them to sit there. They don't know the budget like we do and some of the 531 00:58:29,760 --> 00:58:34,280 opportunities like we do, but as long as we frame it, we'll get that feedback from you. 532 00:58:34,280 --> 00:58:38,760 But it's got to be more targeted. You know, what do we need for new companies? Where do 533 00:58:38,760 --> 00:58:43,160 you see us, you know, maybe needing to invest in some infrastructure, that sort of thing, 534 00:58:43,160 --> 00:58:47,320 and what would be a good starting point? I think this group's kind of gotten tripped 535 00:58:47,320 --> 00:58:53,320 up over the last year in terms of how much money that we need and we don't have an option. 536 00:58:53,320 --> 00:58:58,280 We have a lot of options that we can offer. It's just what are we trying to solve for? 537 00:58:58,280 --> 00:59:03,520 I think we can help you get some compact recommendations for council. And as long as we're going to 538 00:59:03,520 --> 00:59:08,960 them with the financial side, sort of, you know, a menu there, I think we'll get them 539 00:59:08,960 --> 00:59:14,720 to listen and give you some really solid input. But John, your point's right on, but we have 540 00:59:14,720 --> 00:59:19,040 to have that data first to give them, you know, to talk through the options with them. 541 00:59:19,040 --> 00:59:25,240 Well Todd, while you and I are talking, I just wanted to say that I was uncertain who 542 00:59:25,240 --> 00:59:29,000 was going to put the stake in the ground. Somebody's got to put the stake in the ground 543 00:59:29,000 --> 00:59:32,240 and say, this is what we're going to go for. I thought it was the council, but if you're 544 00:59:32,240 --> 00:59:39,520 saying it's us as the think tank, I'm more than happy. But once again, I don't really 545 00:59:39,520 --> 00:59:47,040 know what's reasonable. So somehow we've got to find a goal that's both reasonable and 546 00:59:47,040 --> 00:59:52,600 doable and we'll achieve the goals that we want. So I don't even know how to start that. 547 00:59:52,600 --> 00:59:58,000 I think I'm happy driving the stake out, you know, in providing the options. We just need 548 00:59:58,000 --> 01:00:04,440 a little more specificity with Tom. This conversation will go nowhere with council if all we do is 549 01:00:04,440 --> 01:00:09,020 show them what other cities have to work with. I mean, if we go in basically saying, look, 550 01:00:09,020 --> 01:00:14,440 here's our strategy. We've got an implementation plan for the next couple of years. We really 551 01:00:14,440 --> 01:00:20,040 need to have X amount aside, you know, in a fund to retain or go after jobs if they 552 01:00:20,040 --> 01:00:25,040 present. We've got X amount that we need to invest out there. We'll put the plan together 553 01:00:25,040 --> 01:00:32,040 and run it by you. And I just find that you get much better feedback from the council, 554 01:00:32,040 --> 01:00:37,840 you know, when they have three or four realistic options where the financing's there. You know, 555 01:00:37,840 --> 01:00:42,120 don't forget that this group has got, they go through hundreds and hundreds of things 556 01:00:42,120 --> 01:00:47,040 every month. And so the more compact and better we can package it for them, the better the 557 01:00:47,040 --> 01:00:52,180 feedback you're going to get from them. So I'm happy to have staff work with Tom, bring 558 01:00:52,180 --> 01:00:58,840 something back to the group. We don't need to rush to the 28th of July and maybe next 559 01:00:58,840 --> 01:01:03,040 month we say, hey, here's some ideas we had, here's some targets over the next two years, 560 01:01:03,040 --> 01:01:09,800 five years, here's some ways we could get there and then run that by you and if you're 561 01:01:09,800 --> 01:01:15,200 comfortable with it, get it to council. But I think that thought process there, we just, 562 01:01:15,200 --> 01:01:20,160 both the council and the EDP, we get frozen because we're not coming there with solutions 563 01:01:20,160 --> 01:01:25,520 for you to respond to. Thank you. Thank you. I needed that. 564 01:01:25,520 --> 01:01:32,240 And Jess, if you want to jump in. Sure. I think I'm mostly going to echo exactly 565 01:01:32,240 --> 01:01:39,800 what you said. In my experience, I agree with Tom. I think asking council just kind of workshop 566 01:01:39,800 --> 01:01:46,320 on this idea would lead us down about a thousand rabbit trails without really converging on 567 01:01:46,320 --> 01:01:54,160 a meaningful goal. I think giving us some realistic and attainable options and some 568 01:01:54,160 --> 01:01:58,480 ways to get there, some ideas on how to get there. Even, you know, the most out of the 569 01:01:58,480 --> 01:02:03,160 box idea I've heard yet is the DME thing. I don't think that we've really truly examined 570 01:02:03,160 --> 01:02:09,280 that as a city, but ultimately it's a policy choice, right? The council decides how you 571 01:02:09,280 --> 01:02:15,580 get there and they do that with the best advice they can get. I can tell you, speaking again 572 01:02:15,580 --> 01:02:20,280 only for myself, but with an idea of who my colleagues are, we are not equipped to have 573 01:02:20,280 --> 01:02:26,520 that conversation in the same way that this group is equipped to have that conversation. 574 01:02:26,520 --> 01:02:32,360 Bringing something forward to us that leans heavily on Tom's experience and this group 575 01:02:32,360 --> 01:02:37,840 vetting out what Tom brings, that puts us in a much better position to make meaningful 576 01:02:37,840 --> 01:02:53,880 and realistic decisions. Thank you. Anyone else has any questions, comments? I'm gonna, 577 01:02:53,880 --> 01:02:59,640 I guess just to ask Jessica, does there kind of remind us what our next steps are? I know 578 01:02:59,640 --> 01:03:06,360 there was a timeline in there. Sure. We're asking for public input right now on the website. 579 01:03:06,360 --> 01:03:14,080 So we've, we're hosting an online public comment session in lieu of a community meeting. So 580 01:03:14,080 --> 01:03:19,280 we have been pushing out the message on social media saying, community, give us your ideas 581 01:03:19,280 --> 01:03:26,200 and your feedback, really focused on, again, the broad general concepts and the ideas that 582 01:03:26,200 --> 01:03:30,880 we've put forward to the board. I did talk to Tom this morning and let him know that 583 01:03:30,880 --> 01:03:36,560 we were gonna push back the timeline just a little bit instead of rushing to July, that 584 01:03:36,560 --> 01:03:42,480 we were likely going to council sometime later in August. What I've heard today is that Tom 585 01:03:42,480 --> 01:03:48,600 and Jacqueline and I have a lot of work to do and kind of working through scenarios and 586 01:03:48,600 --> 01:03:53,000 budgets and ideas. There's some additional work that I have been doing that I can share 587 01:03:53,000 --> 01:04:00,040 with them on that and additional analysis as it relates to kind of possible scenarios. 588 01:04:00,040 --> 01:04:05,160 And then maybe that's what we'll bring back to this group at your August meeting and get 589 01:04:05,160 --> 01:04:10,520 feedback. Because what I'm hearing consensus generally about the strategies in the plan, 590 01:04:10,520 --> 01:04:15,800 what I'm hearing is we need more specificity in particular on the fund and how that fund 591 01:04:15,800 --> 01:04:21,560 relates back to the tasks identified in the plan. And so putting actual dollars and cents 592 01:04:21,560 --> 01:04:26,760 to some of those tasks and how the, how the fund can be used to help accomplish that plan. 593 01:04:26,760 --> 01:04:31,640 So if, if we have a month to work on that, then that's what we'll bring back in August 594 01:04:31,640 --> 01:04:37,400 and we can go from there. That was a lot. Does that all make sense to everyone? 595 01:04:37,400 --> 01:04:45,480 It does. Thank you. Anybody have any questions or comments for Jessica? All right. If not, 596 01:04:45,480 --> 01:04:54,880 we'll move on to our next agenda item, which is to EDP 20-026, receive a report, hold discussion, 597 01:04:54,880 --> 01:05:01,280 give staff direction regarding the nominations for the annual business awards. 598 01:05:01,280 --> 01:05:06,880 Thank you guys very much. We're going to sign off. Thanks, Tom. Got our marching orders. 599 01:05:06,880 --> 01:05:14,280 Thank you guys. I'm sure they're getting right to work. 600 01:05:14,280 --> 01:05:21,040 So we usually have an annual awards breakfast, as many of you all know, where different city 601 01:05:21,040 --> 01:05:27,760 departments, as well as boards provide awards to various businesses for different reasons. 602 01:05:27,760 --> 01:05:35,040 This year, unfortunately, we won't be able to hold that awards breakfast, really out of concern, 603 01:05:35,040 --> 01:05:41,440 again, for safety. We don't want to plan to hold an event in September, knowing that large events 604 01:05:41,440 --> 01:05:48,960 are definitely discouraged at this moment. So we have been brainstorming ways to do online awards 605 01:05:48,960 --> 01:05:53,920 or virtual awards, and we're still working out all of the issues related to that. But we definitely 606 01:05:53,920 --> 01:05:59,600 wanted to make sure that this board had an opportunity to continue to nominate and select 607 01:05:59,600 --> 01:06:06,000 award recipients. And so we wanted this item on the agenda to allow for the first discussion 608 01:06:06,000 --> 01:06:15,040 of nominations or how we could move forward, definitely open to ideas of ways we can move 609 01:06:15,040 --> 01:06:21,200 forward. But certainly, this has been an incredibly tough year on our businesses. And I think that any 610 01:06:21,200 --> 01:06:26,720 way that we can demonstrate support to them, knowing that many of them have undertaken 611 01:06:26,720 --> 01:06:34,800 great efforts to assist individuals as well as their employees or even other businesses 612 01:06:34,800 --> 01:06:42,080 in this time. So the board normally does two awards. We added the small business award last 613 01:06:42,080 --> 01:06:48,800 year. So the first award was just the EDP business award. And that was for an employer over 100 614 01:06:48,800 --> 01:06:55,280 employees. And then last year, we added the small business award. In your packet, we had outlined 615 01:06:55,280 --> 01:07:00,880 the award recipients from past years. Last year, the large business award went to embassy suites, 616 01:07:00,880 --> 01:07:07,920 and the small business award went to LA's TECA. So I will just open it up to the board for questions 617 01:07:07,920 --> 01:07:16,640 or discussion and know that we're still in progress. Any comments, questions? 618 01:07:16,640 --> 01:07:23,920 This is Jill Jester. Can you walk us through the timeline of what we need to do? At what point do 619 01:07:23,920 --> 01:07:30,080 we need to start submitting nominees? What information do we need to include in those 620 01:07:30,080 --> 01:07:35,520 nominations at the next meeting? Where should we be in the process? Just so that we kind of, 621 01:07:35,520 --> 01:07:41,200 with everything swirling around, we know when we need to be doing things. Sure. So typically, 622 01:07:41,200 --> 01:07:46,400 we would be having the awards breakfast in September. So we'd use the July, August, 623 01:07:46,400 --> 01:07:51,440 and September meetings to select or to nominate, review the nominations, and make the final 624 01:07:51,440 --> 01:07:55,920 selection of the award recipients. Since we don't have that deadline, we have a little bit more 625 01:07:55,920 --> 01:08:02,080 flexibility. So what I was thinking is that this will kind of kick off the nomination process. 626 01:08:03,280 --> 01:08:08,720 Any board member could submit a nomination between now and the August meeting. At the 627 01:08:08,720 --> 01:08:16,880 August meeting, then we could bring back the research that we normally do. In your packet, 628 01:08:16,880 --> 01:08:23,600 you have the business recognition award criteria sheets. And that staff then goes through the 629 01:08:23,600 --> 01:08:30,160 nominees and evaluates them based on those criteria. And then we bring those back to the 630 01:08:30,160 --> 01:08:35,760 board to review and discuss. So I'm thinking that could happen at the August meeting if we get some 631 01:08:35,760 --> 01:08:40,320 nominations between now and then. Obviously, if not, if we need a little bit more time, 632 01:08:40,320 --> 01:08:45,600 we can have that. Does that answer your question, Jill? Yes, it does. Thank you. 633 01:08:45,600 --> 01:08:56,800 So in for our August meeting, we'll ask the board members to give you any names or suggestions to 634 01:08:56,800 --> 01:09:03,200 to visit about at our next meeting. And then I would also ask staff to bring some names together. 635 01:09:03,200 --> 01:09:08,080 You guys generally do a pretty good job of having the pulse of what's going on. And that's that's 636 01:09:08,080 --> 01:09:17,760 helpful as well. Sure. We can do that. So if the board could send us nominations, if you think of 637 01:09:17,760 --> 01:09:25,760 someone, send it to myself via email, or I'm sure I will see many of you at least remotely between 638 01:09:25,760 --> 01:09:30,720 before the August meeting. And we'll get that work done and then have the 639 01:09:30,720 --> 01:09:34,960 criteria sheets for those nominations at the August meeting. 640 01:09:34,960 --> 01:09:45,440 All right, our next item is EDP 20-019, Receiver Report, 641 01:09:45,440 --> 01:09:49,200 Hold Discussion Regarding the Downtown Economic Development Committee. 642 01:09:49,200 --> 01:09:54,400 I'm not sure who's going to talk about that. 643 01:09:56,240 --> 01:10:02,400 I think Christina has the update for the downtown economic. Christina is shaking her head no, 644 01:10:02,400 --> 01:10:10,240 but she prepared the report. So reports out there. Yeah, we had a meeting the first quarter, 645 01:10:10,240 --> 01:10:15,360 we had a couple meetings and we asked and then we took two months off. We actually met last week 646 01:10:15,360 --> 01:10:24,560 to look at give some feedback on streeteries and parklets and one way traffic versus two way 647 01:10:24,560 --> 01:10:31,680 traffic and had a pretty good discussion on that in the past. So the reports out there, 648 01:10:31,680 --> 01:10:36,320 if anybody has any questions or continuing to meet, that'll meet 649 01:10:36,320 --> 01:10:45,280 next week or two weeks from now. Yes, I think we're meeting the second week of August. We had to 650 01:10:45,280 --> 01:10:51,440 move our meeting. Yes, but just want to, you know, brief update for the committee. Just know that 651 01:10:51,440 --> 01:10:56,080 the downtown economic development committee did take a long break. I think they were one of the 652 01:10:56,080 --> 01:11:01,520 last committees to meet in March and they just started meeting again in July. But after July 653 01:11:01,520 --> 01:11:07,680 meeting, they did have a grant application come forward for H2OAK. And so that was recommended 654 01:11:07,680 --> 01:11:13,360 for approval and that will move on to the TURS board next. And then we, in the report that 655 01:11:13,360 --> 01:11:20,960 Christina did provide to you, it included some updates on the existing grants that used to come 656 01:11:20,960 --> 01:11:24,880 before this board and now have transitioned to the other board. So we'll continue to provide that 657 01:11:24,880 --> 01:11:31,840 information just so that this board remains aware of the grant funding that goes through now directly 658 01:11:31,840 --> 01:11:42,240 from the downtown committee to the TURS board. Comments or questions? 659 01:11:45,440 --> 01:11:54,080 All right. Our last item is EDP 20-027 and that is staff report. So we'll get an update from 660 01:11:54,080 --> 01:12:04,000 Jessica or Christina. Do you guys want to chime in? We did not provide an additional city 661 01:12:04,000 --> 01:12:10,720 report. Our last report that you got about two weeks ago still covers all the items that we 662 01:12:10,720 --> 01:12:19,680 were working for. So I'll let Charlie talk about his report. Yeah, the June reports in your packet 663 01:12:19,680 --> 01:12:28,880 kind of describes what we've been up to. We've been doing a lot of work on our website and 664 01:12:28,880 --> 01:12:35,760 getting that updated and getting it rearranged where it's more easily accessible, particularly 665 01:12:35,760 --> 01:12:43,600 for site locators. We've been doing a lot of research on digital marketing since that's going 666 01:12:43,600 --> 01:12:50,080 to be the future of where we're going and how we can get there and what are some of the things 667 01:12:50,080 --> 01:13:00,320 we need to do to be better prepared for the digital marketing age. We also have 668 01:13:00,320 --> 01:13:07,760 been, during the month of June, we've been handling all of the RFPs for the state and Dallas chamber 669 01:13:07,760 --> 01:13:17,040 and Fort Worth chamber. We submitted nine RFPs during the month of June, then had a visit, 670 01:13:17,040 --> 01:13:26,480 I mean a phone visit with a company that's looking to build a facility for a company in California 671 01:13:27,440 --> 01:13:37,520 that they're trying to get to move. It was a direct call to us and we'll be hosting 672 01:13:37,520 --> 01:13:44,560 one of their company representatives tomorrow afternoon. He just called last night and said, 673 01:13:44,560 --> 01:13:51,040 "I want to come see some sites tomorrow." So we'll be doing that as well as just staying in touch 674 01:13:51,040 --> 01:13:56,800 with a lot of our developers and brokers and finding out where they are with a lot of their 675 01:13:58,400 --> 01:14:01,840 we have, as you know, we have three buildings under construction right now 676 01:14:01,840 --> 01:14:09,360 and just trying to stay on top of those because so many of the RFPs that we get are requiring 677 01:14:09,360 --> 01:14:17,040 existing buildings. So now that we have those, that's going to be a real asset to Denton to 678 01:14:17,040 --> 01:14:24,400 be able to show that we have a building available, be available at a certain point in time and so 679 01:14:25,040 --> 01:14:32,000 we're really excited about that. That's going to be a great deal. Our EDP industrial license 680 01:14:32,000 --> 01:14:43,520 committee met. This is the fundraising group and we met during, we met during, on Zoom during the 681 01:14:43,520 --> 01:14:51,280 month and in providing them with some some marketing material to help provide additional 682 01:14:51,280 --> 01:14:58,320 investors. So we're moving along and staying very busy. Thank you. Any questions? 683 01:14:58,320 --> 01:15:11,120 All right. Thank you, Charlie. I think that's our last item to discuss and before we adjourn, 684 01:15:11,120 --> 01:15:16,000 I want to make sure we recognize a couple of folks that are working behind the scenes. 685 01:15:16,000 --> 01:15:22,960 Billy Matthews is helping record all of this and Rachel drew the short straw to get to listen to 686 01:15:22,960 --> 01:15:29,040 all this all day. She probably does Zoom meetings all day long now and thank you for being here and 687 01:15:29,040 --> 01:15:35,920 helping make sure things are going smoothly as I look at your picture over here on that side. But 688 01:15:35,920 --> 01:15:42,000 our next meeting is Wednesday, August 12th. Make sure that's on your calendar and 689 01:15:43,440 --> 01:15:49,120 we'll just plan on that being Zoom until we hear otherwise. But appreciate everybody 690 01:15:49,120 --> 01:15:56,720 blogging on today and all your efforts and helping the city of Denton. So with that, 691 01:15:56,720 --> 01:15:59,040 I'll take a motion for adjournment. 692 01:15:59,040 --> 01:16:11,440 Come on. I'll move. All right. We're adjourned. Everybody can log off. Go back to your real job. 693 01:16:11,440 --> 01:16:18,080 So thank you so much. Look forward to seeing everybody soon. Thank you. Bye, everyone.