 >> Good evening, ladies and gentlemen, welcome to the planning and zoning commission meeting.

00:00:10.080 --> 00:00:13.680
 This is the work session for Wednesday, May 6, 2020.

00:00:13.680 --> 00:00:17.080
 Seeing that we do have a quorum, I will call this meeting to order at 536.

00:00:17.080 --> 00:00:23.320
 I'll let the record show that Commissioner Cole is not present at the start of the meeting.

00:00:23.320 --> 00:00:29.600
 The first item on our work session is to consider citizens' comment on consent agenda items.

00:00:29.600 --> 00:00:31.600
 There is none to consider.

00:00:31.600 --> 00:00:36.440
 So that moves us right into clarification of agenda items listed on the agenda for the meeting.

00:00:36.440 --> 00:00:41.400
 So that brings us to item 1, the approval of the April 8th meetings.

00:00:41.400 --> 00:00:46.160
 Is there any adjustments that need to be made or comments on the April 8th meeting?

00:00:46.160 --> 00:00:48.680
 Minutes.

00:00:48.680 --> 00:00:50.320
 Seeing none, we'll move on from there.

00:00:50.320 --> 00:00:53.320
 We'll take the vote again in the public session.

00:00:53.320 --> 00:00:56.120
 The second item for business is the consent agenda.

00:00:56.120 --> 00:00:57.280
 We have three items.

00:00:57.280 --> 00:01:01.680
 Does any commissioners need any of those polled for individual consideration?

00:01:01.680 --> 00:01:03.640
 Commissioner Beck.

00:01:03.640 --> 00:01:10.760
 >> Yeah, sorry, I should have raised my hand.

00:01:10.760 --> 00:01:17.160
 Are we still going to have the standard discussion of these items?

00:01:17.160 --> 00:01:18.160
 Or not?

00:01:18.160 --> 00:01:19.960
 >> Well, what we can do is --

00:01:19.960 --> 00:01:20.960
 >> Go ahead.

00:01:20.960 --> 00:01:26.360
 >> Well, we can certainly, if you want to have any presentation on item, have that presentation.

00:01:26.360 --> 00:01:29.680
 But we can also poll one if you want a separate vote.

00:01:29.680 --> 00:01:40.480
 So I'll consider either or, or both if needed.

00:01:40.480 --> 00:01:46.040
 >> When we have presentations from staff, I'd like to just maybe ask some clarifying

00:01:46.040 --> 00:01:48.240
 questions about 2C.

00:01:48.240 --> 00:01:53.160
 Otherwise, I don't have any problems with A or B.

00:01:53.160 --> 00:01:58.760
 So I may or may not request that the appropriate time that to be polled for the regular meeting.

00:01:58.760 --> 00:01:59.760
 >> Okay.

00:01:59.760 --> 00:02:00.760
 Item 2C.

00:02:00.760 --> 00:02:01.760
 >> Yes.

00:02:01.760 --> 00:02:02.760
 >> FR19-0020.

00:02:02.760 --> 00:02:11.280
 Why don't we go ahead -- is Haley or someone available to speak on that item, and then

00:02:11.280 --> 00:02:15.560
 we can -- Commissioner Beck might be able to better ascertain if that needs to be polled?

00:02:15.560 --> 00:02:17.360
 >> Haley's pulling it up now.

00:02:17.360 --> 00:02:18.360
 >> Great.

00:02:18.360 --> 00:02:19.360
 Thank you.

00:02:19.360 --> 00:02:23.960
 >> As she's pulling it up, just if anyone saw the council meeting yesterday, they took

00:02:23.960 --> 00:02:26.000
 votes by roll call.

00:02:26.000 --> 00:02:29.240
 Last plan and zoning meeting we did virtually, we did show of hands.

00:02:29.240 --> 00:02:31.160
 I will be going through the roll call tonight.

00:02:31.160 --> 00:02:37.280
 So all votes, I will call you up by name to consider those votes.

00:02:37.280 --> 00:02:43.880
 Haley, whenever you're ready or whoever's speaking, you have the floor.

00:02:43.880 --> 00:02:45.040
 >> All right.

00:02:45.040 --> 00:02:48.680
 This is an amendment to an already approved replant.

00:02:48.680 --> 00:02:52.520
 So the plat was approved last year, I believe, in 2019.

00:02:52.520 --> 00:02:59.080
 It is a replant of three -- the original replant subdivided one lot into three lots for future

00:02:59.080 --> 00:03:01.040
 commercial development.

00:03:01.040 --> 00:03:06.000
 There was a note on that plat that referenced that all of the trees on lot 6R2 would be

00:03:06.000 --> 00:03:07.560
 preserved.

00:03:07.560 --> 00:03:09.080
 That note was in error.

00:03:09.080 --> 00:03:13.400
 And so after noticing that error before filing the plat, the applicant has requested this

00:03:13.400 --> 00:03:17.960
 amendment be approved to reword that note to correctly indicate that all of the trees

00:03:17.960 --> 00:03:21.600
 on that lot can be removed in accordance with the code.

00:03:21.600 --> 00:03:25.720
 >> Commissioner Bec, do you have any questions for Haley?

00:03:25.720 --> 00:03:26.720
 >> Yeah.

00:03:26.720 --> 00:03:28.600
 So that was the one.

00:03:28.600 --> 00:03:29.600
 And she addressed that one.

00:03:29.600 --> 00:03:34.720
 And the other is -- and I'm just forgetting what was told to us before, and I apologize

00:03:34.720 --> 00:03:36.080
 to staff for that.

00:03:36.080 --> 00:03:41.680
 But I was concerned about the traffic flowing in and out of the back of the school and there

00:03:41.680 --> 00:03:50.320
 out of the fire station, and the traffic reports and the fire people in particular are completely

00:03:50.320 --> 00:04:02.380
 copacetic with building right up onto that road.

00:04:02.380 --> 00:04:08.140
 >> My understanding from being out at that site near the library and fire station is

00:04:08.140 --> 00:04:10.180
 there is some cross-connectivity there.

00:04:10.180 --> 00:04:17.360
 This site, I believe, has an additional driveway on Teasley and also has a driveway connection

00:04:17.360 --> 00:04:19.380
 to Teasley to the north as well.

00:04:19.380 --> 00:04:22.520
 So traffic flow with this replant is not changing.

00:04:22.520 --> 00:04:25.520
 Those points of access are staying the same.

00:04:25.520 --> 00:04:29.640
 And the lot closest to the fire station that you see is lot 6R3 is currently a detention

00:04:29.640 --> 00:04:33.240
 facility that's maintained by the Business Owners Association.

00:04:33.240 --> 00:04:37.560
 So it's not likely that that lot will be developed with any sort of building in the near future

00:04:37.560 --> 00:04:43.720
 as that detention would have to be put underground to do so.

00:04:43.720 --> 00:04:44.720
 >> Okay.

00:04:44.720 --> 00:04:45.720
 Thank you.

00:04:45.720 --> 00:04:46.720
 That was my biggest concern.

00:04:46.720 --> 00:04:48.320
 Chair, I won't need to have that pulled.

00:04:48.320 --> 00:04:49.320
 Thank you.

00:04:49.320 --> 00:04:51.080
 >> Absolutely, Commissioner Beck.

00:04:51.080 --> 00:04:59.900
 Is there any other questions for the consent agenda items to A, B, and C?

00:04:59.900 --> 00:05:02.920
 Before we move to the next item, I'll let the record show that Commissioner Cole has

00:05:02.920 --> 00:05:03.920
 joined us.

00:05:03.920 --> 00:05:06.400
 Welcome, Commissioner Cole.

00:05:06.400 --> 00:05:13.760
 This item for business is item 3A, ZCP20-0002.

00:05:13.760 --> 00:05:16.720
 This item is for individual consideration.

00:05:16.720 --> 00:05:24.280
 And Haley, this is your item for presentation.

00:05:24.280 --> 00:05:35.080
 >> All right.

00:05:35.080 --> 00:05:37.120
 This is case ZCP20-2.

00:05:37.120 --> 00:05:41.200
 It's the site plan for the residences at Razor Ranch.

00:05:41.200 --> 00:05:45.720
 The request is for approval of a site plan for single-family detached and townhome uses.

00:05:45.720 --> 00:05:48.720
 The site is approximately 40 acres.

00:05:48.720 --> 00:05:50.080
 It's outlined in yellow on the map.

00:05:50.080 --> 00:05:55.460
 As you can see, it's located just north of the Razor Ranch Marketplace development.

00:05:55.460 --> 00:06:00.120
 It's important to note that this is a little odd that we're seeing a site plan for residential

00:06:00.120 --> 00:06:01.120
 development.

00:06:01.120 --> 00:06:03.800
 This is unique to the Razor Ranch Overlay District.

00:06:03.800 --> 00:06:07.200
 The preliminary plat has been approved for this entire 40 acres.

00:06:07.200 --> 00:06:13.120
 And the final plat for phase 1 has been approved by this commission as well.

00:06:13.120 --> 00:06:15.840
 So a little bit of background on this.

00:06:15.840 --> 00:06:19.920
 This site plan is further unique because the marketplace was the first part of the Razor

00:06:19.920 --> 00:06:20.920
 Ranch development.

00:06:20.920 --> 00:06:27.560
 So this actually ties back to ordinances from 2008 and 2009 for the site plan approval procedures.

00:06:27.560 --> 00:06:31.860
 So similar to what you've seen before, but slightly different in that building elevations

00:06:31.860 --> 00:06:34.160
 were not a requirement of that ordinance.

00:06:34.160 --> 00:06:38.000
 Some samples have been provided here to give you an idea of what the homes would look like,

00:06:38.000 --> 00:06:44.600
 but those are not part of the approval criteria, just the site plan and landscape plan.

00:06:44.600 --> 00:06:49.380
 The criteria for approval in the 2008 and 2009 ordinances are substantially the same

00:06:49.380 --> 00:06:51.880
 as what you've seen for other Razor Ranch site plans.

00:06:51.880 --> 00:06:56.260
 So it requires compliance with the concept plan, whether there's a compatible arrangement

00:06:56.260 --> 00:07:00.440
 of buildings that would not adversely affect adjoining properties, whether the plan provides

00:07:00.440 --> 00:07:04.680
 for adequate and safe vehicular circulation, and rather it complies with all other sections

00:07:04.680 --> 00:07:07.600
 of the overlay.

00:07:07.600 --> 00:07:11.560
 So just to give you a little bit of background on this site, it does have split zoning.

00:07:11.560 --> 00:07:15.280
 The Razor Ranch overlay, again, references back to the 2002 zoning district.

00:07:15.280 --> 00:07:19.640
 So that is a split of neighborhood residential 3 on the north and neighborhood residential

00:07:19.640 --> 00:07:23.880
 mixed use 12 on the south.

00:07:23.880 --> 00:07:27.720
 This has been designated as a residential sub area of the marketplace since the beginning

00:07:27.720 --> 00:07:31.960
 of Razor Ranch, and it permits a single family and townhome uses, which is what's proposed

00:07:31.960 --> 00:07:34.380
 with this site plan.

00:07:34.380 --> 00:07:39.080
 This particular site is subject to the architectural and landscape standards from exhibit C4 of

00:07:39.080 --> 00:07:43.640
 the overlay district, which was approved through ordinance in 2018.

00:07:43.640 --> 00:07:48.440
 If any of you recall that, you may recall that as part of that approval, the applicant

00:07:48.440 --> 00:07:53.080
 at the time volunteered that this northern part of the NRMU 12 portion of the site would

00:07:53.080 --> 00:07:57.640
 be developed in accordance with NR3 to provide a single family buffer to the existing neighborhood.

00:07:57.640 --> 00:08:04.200
 It further limited the development to 70 single family homes and 230 townhomes, plus an amenity

00:08:04.200 --> 00:08:05.640
 center.

00:08:05.640 --> 00:08:09.960
 The developer at this time has not quite finalized their plans for the amenity center.

00:08:09.960 --> 00:08:13.240
 So that will be coming back before you as a separate site plan in the future once they

00:08:13.240 --> 00:08:17.920
 have those plans firmed up a little bit further.

00:08:17.920 --> 00:08:22.640
 I wanted to show you the 2008 concept plan that this is required to comply with.

00:08:22.640 --> 00:08:26.980
 So this plan, it may be hard to see, but I've outlined in red the property that we're looking

00:08:26.980 --> 00:08:27.980
 at.

00:08:27.980 --> 00:08:33.360
 It reflects a mixture of townhomes and single family detached uses, you may see a substantial

00:08:33.360 --> 00:08:34.960
 portion of open space on that.

00:08:34.960 --> 00:08:39.860
 At the time, it allowed for two gas well drilling and production sites to be on this property.

00:08:39.860 --> 00:08:44.280
 Those were later removed from the razor range overlay once that site on the south side of

00:08:44.280 --> 00:08:46.840
 the campus went into place.

00:08:46.840 --> 00:08:49.440
 So that opened up more of this property for residential use.

00:08:49.440 --> 00:08:52.960
 And since this time, the ordinances have just shown this as being a single family and townhome

00:08:52.960 --> 00:08:55.520
 area.

00:08:55.520 --> 00:08:58.520
 So this is a look at the site plan that they've proposed.

00:08:58.520 --> 00:09:02.680
 It substantially complies with the preliminary plan and the final plan for phase one that

00:09:02.680 --> 00:09:05.000
 the same lot and street configuration.

00:09:05.000 --> 00:09:08.360
 This reflects 65 single family homes.

00:09:08.360 --> 00:09:13.440
 Those again are within the NR3 area and then within this portion of the NRMU 12 that they

00:09:13.440 --> 00:09:18.320
 offered to develop as a buffer between the townhomes and the existing neighborhood.

00:09:18.320 --> 00:09:22.720
 There are 215 townhome lots reflected on the south part of the property.

00:09:22.720 --> 00:09:26.800
 All of these streets and alleys that are shown within the townhome area would be privately

00:09:26.800 --> 00:09:28.100
 maintained.

00:09:28.100 --> 00:09:32.640
 The larger streets that you see going through the single family portion would be public

00:09:32.640 --> 00:09:36.880
 streets.

00:09:36.880 --> 00:09:39.840
 This is a look at their landscape plan that they're proposing.

00:09:39.840 --> 00:09:45.160
 It meets the street tree requirements with over 200 street trees shown on the plan.

00:09:45.160 --> 00:09:50.840
 The single family lots will maintain 50% landscape area on each individual lot that will be looked

00:09:50.840 --> 00:09:54.640
 at individually as those permits come in for those homes, but they've demonstrated that

00:09:54.640 --> 00:09:56.960
 they can comply with that.

00:09:56.960 --> 00:10:01.520
 And then the NRMU 12 portion averages the open space as is allowed by the ordinance

00:10:01.520 --> 00:10:07.800
 and will have a 45% open space across the townhome areas.

00:10:07.800 --> 00:10:10.720
 This is a look at the intended townhome elevations.

00:10:10.720 --> 00:10:14.520
 So they're consistent with what we see in Razor Ranch in terms of neutral color palette,

00:10:14.520 --> 00:10:17.680
 stucco and masonry materials.

00:10:17.680 --> 00:10:21.560
 And then this is samples that were provided of the type of single family detached homes

00:10:21.560 --> 00:10:25.560
 that are intended to be developed on the north side.

00:10:25.560 --> 00:10:31.480
 And staff is recommending approval of this request as it meets the established criteria.

00:10:31.480 --> 00:10:35.520
 And I will minimize this so that you can see if there are any questions.

00:10:35.520 --> 00:10:37.080
 - Commissioner Smith.

00:10:37.080 --> 00:10:39.160
 - Thank you, Chair.

00:10:39.160 --> 00:10:44.840
 Haley, is that property is going to link into that detention pond that's just to the south,

00:10:44.840 --> 00:10:45.840
 correct?

00:10:45.840 --> 00:10:46.840
 - Correct.

00:10:46.840 --> 00:10:49.560
 The drainage into that pond actually flows from the neighborhood to the north through

00:10:49.560 --> 00:10:51.320
 this property and into that pond.

00:10:51.320 --> 00:10:55.480
 So as part of the phase two that hasn't been final plotted yet, they will go through the

00:10:55.480 --> 00:10:59.600
 civil engineering process to make sure that the drainage appropriately goes through this

00:10:59.600 --> 00:11:03.960
 site and to that pond to maintain the functionality of those bioretention ponds.

00:11:03.960 --> 00:11:04.960
 - Okay.

00:11:04.960 --> 00:11:05.960
 Got it.

00:11:05.960 --> 00:11:06.960
 Thank you.

00:11:06.960 --> 00:11:07.960
 Commissioner Anderson.

00:11:07.960 --> 00:11:08.960
 - Thank you, Chair.

00:11:08.960 --> 00:11:09.960
 Quick question, Haley.

00:11:09.960 --> 00:11:15.240
 The neighborhood, the townhomes that are gonna be private roads, are they gonna be gated?

00:11:15.240 --> 00:11:20.160
 - No, the only gate within the development will be on the south side where the driveway

00:11:20.160 --> 00:11:26.200
 connects into the marketplace commercial development that will be gated to control commercial access

00:11:26.200 --> 00:11:27.680
 through the property.

00:11:27.680 --> 00:11:29.400
 Otherwise it won't be gated.

00:11:29.400 --> 00:11:33.840
 But the way it's plotted, those alleyways are not dedicated to the city, they're to

00:11:33.840 --> 00:11:34.840
 the HOA.

00:11:34.840 --> 00:11:35.840
 - Thank you.

00:11:35.840 --> 00:11:36.840
 - Commissioner Beck.

00:11:36.840 --> 00:11:37.840
 - Yeah.

00:11:37.840 --> 00:11:45.000
 Haley, can I get you to pull up the map again and then show me where the connection is?

00:11:45.000 --> 00:11:48.760
 Is it next to the Walmart?

00:11:48.760 --> 00:11:50.760
 - Yes.

00:11:50.760 --> 00:11:53.640
 - And that's gonna be gated?

00:11:53.640 --> 00:11:57.800
 - Yes, the connection is here on the south side.

00:11:57.800 --> 00:12:02.720
 This driveway has been stubbed out from the marketplace, so I believe this is Walmart

00:12:02.720 --> 00:12:05.800
 here and then Sam's.

00:12:05.800 --> 00:12:09.880
 And that will be a gated connection so that the residents could get through to go shopping,

00:12:09.880 --> 00:12:12.900
 but commercial traffic couldn't just freely flow into this development.

00:12:12.900 --> 00:12:16.400
 It would still be funneled out through the entrances in and out of the marketplace on

00:12:16.400 --> 00:12:18.920
 University and Bonnie Bray.

00:12:18.920 --> 00:12:24.120
 - And the Augusta stub on the west, looks like it's just gonna dead end in that connection

00:12:24.120 --> 00:12:26.880
 to the marketplace, right?

00:12:26.880 --> 00:12:31.200
 - Just this street?

00:12:31.200 --> 00:12:38.120
 - So they're gonna connect to the west to Augusta, but then it's gonna dead end in whatever

00:12:38.120 --> 00:12:40.720
 the road into the marketplace is called.

00:12:40.720 --> 00:12:43.080
 I can't read it on the map.

00:12:43.080 --> 00:12:46.620
 - Yes, so that street will, it meanders on purpose.

00:12:46.620 --> 00:12:50.080
 Our engineering department was concerned when they came in with their preliminary plat about

00:12:50.080 --> 00:12:52.000
 this becoming just a straight shot.

00:12:52.000 --> 00:12:53.880
 - Exactly, yes.

00:12:53.880 --> 00:12:55.160
 - The frontage road to Bonnie Bray.

00:12:55.160 --> 00:12:59.080
 So they intentionally meandered that so that people would have two options.

00:12:59.080 --> 00:13:03.360
 They could either come here and turn or they could turn here and make the loop and go through

00:13:03.360 --> 00:13:04.760
 to help slow traffic.

00:13:04.760 --> 00:13:06.120
 - Okay.

00:13:06.120 --> 00:13:07.120
 Those are my questions.

00:13:07.120 --> 00:13:09.840
 Thank you, Haley.

00:13:09.840 --> 00:13:12.120
 Any other questions for Haley?

00:13:12.120 --> 00:13:16.120
 Haley, I do not see any.

00:13:16.120 --> 00:13:20.160
 Thank you very much for the presentation.

00:13:20.160 --> 00:13:22.720
 That brings us to our public hearings.

00:13:22.720 --> 00:13:28.240
 Item 4A has been requested for postponement to a date uncertain.

00:13:28.240 --> 00:13:31.600
 Richard, do we need to take a vote to postpone this?

00:13:31.600 --> 00:13:32.600
 Okay.

00:13:32.600 --> 00:13:36.080
 Christian or Bec, did you have something on item 4A?

00:13:36.080 --> 00:13:37.080
 - Yes, I did.

00:13:37.080 --> 00:13:39.160
 I just had a clarification.

00:13:39.160 --> 00:13:46.160
 So what are the ramifications of postponement to a date uncertain versus the shot clock?

00:13:46.160 --> 00:13:48.400
 I'm just not clear on that.

00:13:48.400 --> 00:13:52.680
 - Richard, you can correct me if I'm wrong, but the shot clock would apply to platting

00:13:52.680 --> 00:13:54.680
 not to zoning changes.

00:13:54.680 --> 00:14:00.960
 So this just provides an indefinite time for the applicant to come back with the presentation.

00:14:00.960 --> 00:14:01.960
 Correct, Richard?

00:14:01.960 --> 00:14:05.640
 - I can't hear you, you're muted.

00:14:05.640 --> 00:14:06.640
 - He's muted.

00:14:06.640 --> 00:14:07.640
 He doesn't know.

00:14:07.640 --> 00:14:08.640
 There we go.

00:14:08.640 --> 00:14:17.080
 - It's two mice in front of me, and I grabbed two mouses.

00:14:17.080 --> 00:14:21.240
 It only relates to plats, and with respect to the postponement, yes, we would need a

00:14:21.240 --> 00:14:22.240
 vote.

00:14:22.240 --> 00:14:23.240
 Sorry about that.

00:14:23.240 --> 00:14:24.240
 - Okay.

00:14:24.240 --> 00:14:25.240
 Great.

00:14:25.240 --> 00:14:29.000
 Are they planning on reposting this?

00:14:29.000 --> 00:14:33.400
 Do we want to open it and take a vote, or are we reposting this entirely?

00:14:33.400 --> 00:14:35.760
 - We'll have to repost it entirely.

00:14:35.760 --> 00:14:36.760
 - Okay.

00:14:36.760 --> 00:14:39.440
 Let's see if I can take a motion without opening it.

00:14:39.440 --> 00:14:41.840
 The chair will understand a motion to postpone this to a date uncertain.

00:14:41.840 --> 00:14:44.840
 - I make that motion.

00:14:44.840 --> 00:14:49.920
 - Christopher, I make the motion to postpone.

00:14:49.920 --> 00:14:50.920
 - To a date uncertain.

00:14:50.920 --> 00:14:51.920
 - To a date uncertain.

00:14:51.920 --> 00:14:52.920
 Thank you.

00:14:52.920 --> 00:14:53.920
 Anyone second the motion?

00:14:53.920 --> 00:14:54.920
 - Why are we doing this in work session?

00:14:54.920 --> 00:14:55.920
 Why are we voting on this?

00:14:55.920 --> 00:14:56.920
 - Oh, yeah.

00:14:56.920 --> 00:14:57.920
 Why am I doing this in work session?

00:14:57.920 --> 00:14:58.920
 - I don't know.

00:14:58.920 --> 00:15:00.920
 Me and Margie both looked really confused for a second.

00:15:00.920 --> 00:15:03.920
 - And I was confused that y'all were confused, because I was like, "Why are we doing this

00:15:03.920 --> 00:15:04.920
 in work session?"

00:15:04.920 --> 00:15:07.640
 - I was confused that y'all were confused, because I was doing this.

00:15:07.640 --> 00:15:09.680
 We're not even going to worry about that.

00:15:09.680 --> 00:15:11.160
 We're just going to get all done right now.

00:15:11.160 --> 00:15:13.480
 Commissioner Smith, thank you for keeping me on task.

00:15:13.480 --> 00:15:14.480
 - You're welcome.

00:15:14.480 --> 00:15:17.000
 - If I had Richard next to me, it would have been helpful.

00:15:17.000 --> 00:15:18.600
 He's in another room.

00:15:18.600 --> 00:15:19.600
 Okay.

00:15:19.600 --> 00:15:21.560
 So we'll move on from 4A.

00:15:21.560 --> 00:15:23.120
 We'll take a vote in public session.

00:15:23.120 --> 00:15:24.480
 Sorry about that.

00:15:24.480 --> 00:15:31.280
 Item 4B is PDA 20-0001, and the item is Julie Wyatt.

00:15:31.280 --> 00:15:33.560
 Is she here to present this item?

00:15:33.560 --> 00:15:34.560
 - She's ready to go.

00:15:34.560 --> 00:15:39.560
 - Perfect.

00:15:39.560 --> 00:15:48.960
 - Sorry, I was muted.

00:15:48.960 --> 00:15:49.960
 Good evening.

00:15:49.960 --> 00:15:51.520
 I'm pulling up my presentation now.

00:15:51.520 --> 00:15:54.960
 - Evening, Julie.

00:15:54.960 --> 00:15:58.400
 - All right.

00:15:58.400 --> 00:16:04.280
 So I'm Julie Wyatt, and I'm presenting PDA 21 Stonehill Center to you.

00:16:04.280 --> 00:16:08.200
 The request is for a detailed plan amendment for PD 142.

00:16:08.200 --> 00:16:10.600
 It's also known as Stonehill Center.

00:16:10.600 --> 00:16:15.040
 The purpose of the request is to add a 30,000 square foot building to accommodate a single

00:16:15.040 --> 00:16:19.120
 tenant workforce solutions of North Texas.

00:16:19.120 --> 00:16:20.720
 The property is outlined in yellow.

00:16:20.720 --> 00:16:23.440
 It's a 19.6 acre site.

00:16:23.440 --> 00:16:31.720
 It's located at the corner of I-35 and West Gate on the east side of I-35.

00:16:31.720 --> 00:16:34.180
 Just a little bit of background on this type of PD.

00:16:34.180 --> 00:16:36.280
 This is one of our legacy PDs.

00:16:36.280 --> 00:16:41.200
 It was in existence prior to the 2002 code being adopted.

00:16:41.200 --> 00:16:45.960
 And there was an ordinance that was approved last fall that said those valid PDs that were

00:16:45.960 --> 00:16:50.600
 in existence prior to the 2019 DDC, they would follow the regulations that were in place

00:16:50.600 --> 00:16:52.200
 when they were adopted.

00:16:52.200 --> 00:16:55.520
 So this follows the 91 code.

00:16:55.520 --> 00:17:01.360
 And if you recall from previous submittals for others of these types of PDs, it's a

00:17:01.360 --> 00:17:02.360
 two-step process.

00:17:02.360 --> 00:17:08.480
 First, we have the general concept plan that establishes the use, the property boundaries,

00:17:08.480 --> 00:17:13.820
 maybe the approximate locations of those uses, street locations, and then development standards.

00:17:13.820 --> 00:17:16.800
 That's kind of the zoning of the property, and that stays in place.

00:17:16.800 --> 00:17:19.400
 The second step is that detail plan.

00:17:19.400 --> 00:17:24.080
 And this is for specific sites and for specific developments.

00:17:24.080 --> 00:17:26.400
 It's very akin to a site plan.

00:17:26.400 --> 00:17:29.920
 It provides all those details associated with development.

00:17:29.920 --> 00:17:35.880
 If construction did not commence within 24 months, then the detail plan would expire.

00:17:35.880 --> 00:17:39.680
 So specifically for PD 142, it was established in 1991.

00:17:39.680 --> 00:17:43.480
 It was a total of 245 acres.

00:17:43.480 --> 00:17:46.960
 And that was when the concept plan was approved, and it included things like the permitted

00:17:46.960 --> 00:17:48.640
 uses and the development standards.

00:17:48.640 --> 00:17:51.000
 So that was that step one.

00:17:51.000 --> 00:17:54.840
 The subject property, that Stonehill Center, is outlined in black, so you can kind of see

00:17:54.840 --> 00:17:59.320
 it sort of nested in the center of PD 142.

00:17:59.320 --> 00:18:04.660
 The first detail plan for this PD was approved in 1992.

00:18:04.660 --> 00:18:06.840
 It depicted four buildings.

00:18:06.840 --> 00:18:08.360
 They were multi-tenant retail buildings.

00:18:08.360 --> 00:18:12.920
 They were arranged in a horseshoe pattern around 806 parking spaces.

00:18:12.920 --> 00:18:18.440
 So this was the step two in the two-step process, so the first step two.

00:18:18.440 --> 00:18:25.040
 There were modifications over the next year or so, and it resulted in this plan from 1993,

00:18:25.040 --> 00:18:27.780
 which depicts five buildings.

00:18:27.780 --> 00:18:31.800
 The buildings two through five, their numbers are in green.

00:18:31.800 --> 00:18:35.040
 Those have been built, so those are existing.

00:18:35.040 --> 00:18:42.160
 Building one was never constructed, and so therefore the approval expired.

00:18:42.160 --> 00:18:48.280
 So the current proposal really is to introduce that building one back into the plan.

00:18:48.280 --> 00:18:52.040
 It would complement that existing four commercial buildings.

00:18:52.040 --> 00:18:58.120
 Those existing buildings range in size from about 26,000 square feet to 47,000 square

00:18:58.120 --> 00:18:59.120
 feet.

00:18:59.120 --> 00:19:03.480
 Currently there are 945 parking spaces on site and three access points, one that connects

00:19:03.480 --> 00:19:09.560
 to Westgate, one that connects to the I-35 frontage road, and then a connection to the

00:19:09.560 --> 00:19:14.660
 adjacent commercial lot, which connects then through Loop 288.

00:19:14.660 --> 00:19:19.680
 As I said, they're proposing this 30,000 square foot building there in yellow.

00:19:19.680 --> 00:19:22.880
 With landscaping, the access would remain unchanged.

00:19:22.880 --> 00:19:28.880
 We'll zoom in a little bit to that site so you could take a look at some of the details.

00:19:28.880 --> 00:19:32.680
 First of all, if you look at that inset aerial, you can see where they're proposing the building

00:19:32.680 --> 00:19:34.260
 has parking spaces on it.

00:19:34.260 --> 00:19:43.060
 So if approved, this would result in a reduction of parking, but it would maintain a parking

00:19:43.060 --> 00:19:49.120
 ratio of about one space for every 206 square feet of gross floor area.

00:19:49.120 --> 00:19:56.880
 The area between the building and the right-of-way would have about 17,800 square feet of landscaping.

00:19:56.880 --> 00:20:02.720
 They would plant 16 large and medium canopy trees, which would result in a canopy increase

00:20:02.720 --> 00:20:08.440
 for the site at maturity of about 16,802 square feet.

00:20:08.440 --> 00:20:15.400
 The parking area that they would like to add in nibbles in a bit to the existing landscaping,

00:20:15.400 --> 00:20:21.040
 so they would replace that screening hedge, and it's in that squiggly red line there.

00:20:21.040 --> 00:20:24.400
 And then the vehicular circulation pattern would remain unchanged.

00:20:24.400 --> 00:20:31.000
 It would follow that existing pattern of the drive aisles being determined by those landscape

00:20:31.000 --> 00:20:36.280
 islands and landscape medians.

00:20:36.280 --> 00:20:40.760
 They are proposing architectural elements that are consistent with what is on site.

00:20:40.760 --> 00:20:46.920
 So the top two pictures are their renderings, and then the bottom two pictures are what

00:20:46.920 --> 00:20:47.920
 is existing.

00:20:47.920 --> 00:20:51.620
 So you can see they're bothering a lot of the themes of what the existing development

00:20:51.620 --> 00:20:53.000
 has.

00:20:53.000 --> 00:20:59.160
 As I stated, we do follow that 1991 ordinance.

00:20:59.160 --> 00:21:07.200
 Section 35-52 laid out the criteria for approval within the '91 ordinance, and we'll go over

00:21:07.200 --> 00:21:09.240
 these individually.

00:21:09.240 --> 00:21:13.000
 So first, does the proposal comply with the concept plan?

00:21:13.000 --> 00:21:18.720
 The purpose of PD 142 was to create an urban center with commercial, retail, office, light

00:21:18.720 --> 00:21:24.480
 industrial-type uses to serve as a hub for economic activity employment there at the

00:21:24.480 --> 00:21:28.460
 intersection of Loop 288 and I-35.

00:21:28.460 --> 00:21:32.140
 Previous detail plans didn't really specify a use.

00:21:32.140 --> 00:21:36.560
 They were more limited to spatial elements, like building arrangement, where the parking

00:21:36.560 --> 00:21:41.120
 areas would be, what kind of signage, and then that landscaping.

00:21:41.120 --> 00:21:43.040
 Just how the PD functions.

00:21:43.040 --> 00:21:49.000
 When a particular tenant would like to move in to one of these buildings and seeks a certificate

00:21:49.000 --> 00:21:53.880
 of occupancy within the PD, we refer to the listing of permitted uses in that concept

00:21:53.880 --> 00:21:57.040
 plan for guidance.

00:21:57.040 --> 00:22:00.720
 But we have looked at the uses that the applicant is proposing.

00:22:00.720 --> 00:22:07.560
 Their proposed use is offices in a public community center, and those uses are permitted,

00:22:07.560 --> 00:22:10.800
 as well as the proposal meets the dimensional requirements.

00:22:10.800 --> 00:22:17.520
 So the proposal does comply with that concept plan and meets the first criterion.

00:22:17.520 --> 00:22:23.460
 The second criterion for approval is, does it provide a compatible arrangement of buildings

00:22:23.460 --> 00:22:27.800
 and uses, and does it adversely affect the adjoining properties outside the plan?

00:22:27.800 --> 00:22:30.820
 So we're going to take both of these elements separately.

00:22:30.820 --> 00:22:35.880
 So first, inside the development, the arrangement of the buildings, the proposed building is

00:22:35.880 --> 00:22:40.480
 consistent with those general building scales, architectural themes, and that established

00:22:40.480 --> 00:22:43.040
 footprint pattern.

00:22:43.040 --> 00:22:48.880
 Essentially it completes that unified development that was established with that original plan.

00:22:48.880 --> 00:22:55.400
 The proposed use is consistent with the types of uses that are already on site at the Stone

00:22:55.400 --> 00:22:56.680
 Hill Center.

00:22:56.680 --> 00:23:02.560
 The daily activities as typically associated with an office create minimal nuisances like

00:23:02.560 --> 00:23:08.360
 noise or odor and also maintains the typical hours of operation that we see at Stone Hill

00:23:08.360 --> 00:23:09.360
 Center.

00:23:09.360 --> 00:23:16.000
 The applicant also provided the ITE trip generation rates for the proposed use, and it would generate

00:23:16.000 --> 00:23:23.640
 approximately 292 trips per 24-hour weekday with 44 morning peak and 43 evening peak,

00:23:23.640 --> 00:23:28.160
 once again consistent with what's on site.

00:23:28.160 --> 00:23:33.080
 And then we looked at what was outside the PD, kind of looked at how it affected those

00:23:33.080 --> 00:23:34.400
 surrounding properties.

00:23:34.400 --> 00:23:39.920
 So before we talk about those, I just want to call your attention to some mobility improvements

00:23:39.920 --> 00:23:42.120
 that are going to be going on in the area.

00:23:42.120 --> 00:23:47.840
 You could see on the map that there is a green hatched line.

00:23:47.840 --> 00:23:55.800
 Only West Gate comes off of the I-35 service road and then stops at the easternmost boundary

00:23:55.800 --> 00:23:57.280
 of the Stone Hill Center.

00:23:57.280 --> 00:24:02.520
 However, in the future, that will actually be extended and become the new Bronco way

00:24:02.520 --> 00:24:06.240
 to accommodate the future Denton High School as well as other developments.

00:24:06.240 --> 00:24:12.280
 So that piece will eventually be completed and connect the I-35 service road to Bonnie

00:24:12.280 --> 00:24:13.640
 Bray.

00:24:13.640 --> 00:24:16.320
 That being said, there are properties around there.

00:24:16.320 --> 00:24:20.080
 First of all, I want to talk about number one, that existing residential.

00:24:20.080 --> 00:24:24.720
 There is southeast of the subject property, an established neighborhood, it's a large

00:24:24.720 --> 00:24:33.040
 lot neighborhood, and their existing West Gate, so that north-south road within that

00:24:33.040 --> 00:24:38.720
 neighborhood will not connect to the future West Gate/Bronco way.

00:24:38.720 --> 00:24:44.120
 So there will not be any direct vehicular connection between the proposed development

00:24:44.120 --> 00:24:50.600
 and that single-family residential neighborhood, so we don't anticipate any adverse impacts.

00:24:50.600 --> 00:24:54.000
 There's quite a bit of physical separation.

00:24:54.000 --> 00:24:57.600
 Second, the future DHS site.

00:24:57.600 --> 00:25:01.760
 The commercial land uses that are proposed are generally compatible with high school campuses.

00:25:01.760 --> 00:25:04.840
 It also, once again, is physically separated.

00:25:04.840 --> 00:25:09.160
 There's a lot of space between the proposed use and the Denton High School.

00:25:09.160 --> 00:25:13.480
 And then third, that future residential north of the Denton High School.

00:25:13.480 --> 00:25:16.180
 You might remember it, it's the King's Ridge development.

00:25:16.180 --> 00:25:21.240
 It's proposed for 368 single-family uses, or dwellings.

00:25:21.240 --> 00:25:24.800
 Once again, it is physically separated from the subject property.

00:25:24.800 --> 00:25:29.040
 There's a vacant lot between there, so there's a good buffer and transition area, so we don't

00:25:29.040 --> 00:25:33.800
 anticipate any adverse impacts.

00:25:33.800 --> 00:25:40.120
 And so the subject request complies with criteria number two.

00:25:40.120 --> 00:25:44.480
 Number three, adequate safe circulation of vehicle vehicular traffic.

00:25:44.480 --> 00:25:47.520
 Once again, we're going to talk about onsite versus offsite.

00:25:47.520 --> 00:25:52.360
 Access to the site will remain unchanged, as I stated, as well as that existing vehicular

00:25:52.360 --> 00:25:55.440
 circulation pattern will remain unchanged.

00:25:55.440 --> 00:25:59.640
 The only real change regarding vehicular traffic onsite would be that decrease in the number

00:25:59.640 --> 00:26:01.640
 of onsite parking spaces.

00:26:01.640 --> 00:26:08.240
 However, the overall ratio will, as I said, be maintained at one space per 206 square

00:26:08.240 --> 00:26:14.400
 feet of building area, and that's really consistent with the minimum parking requirements we typically

00:26:14.400 --> 00:26:18.560
 see for more modern developments within the city of Denton.

00:26:18.560 --> 00:26:22.760
 So we don't anticipate any adverse impacts for that.

00:26:22.760 --> 00:26:29.200
 And then offsite, you can see that I've kind of showing where the highways are and where

00:26:29.200 --> 00:26:30.600
 those arterials are.

00:26:30.600 --> 00:26:37.120
 This is adjacent to I-35 and really, really close to the Loop 288 highway, so as well

00:26:37.120 --> 00:26:45.720
 as the future Bronco Way and Westgate, Bonnie Bray, and Highway 377.

00:26:45.720 --> 00:26:51.440
 So the surrounding arterial network provides adequate access for the existing and future

00:26:51.440 --> 00:26:53.520
 development.

00:26:53.520 --> 00:26:57.760
 And then criterion four, substantial compliance with the landscape sign subdivision and other

00:26:57.760 --> 00:26:59.460
 regulations of the city.

00:26:59.460 --> 00:27:04.120
 So with this request, they're not proposing any additional ground signs, and the property

00:27:04.120 --> 00:27:05.120
 is already subdivided.

00:27:05.120 --> 00:27:07.840
 So what we're really looking at is the landscape plan.

00:27:07.840 --> 00:27:12.760
 And this actually follows the 1988 landscape code, and it's pretty different than what

00:27:12.760 --> 00:27:13.760
 we have today.

00:27:13.760 --> 00:27:18.760
 There really were three elements to that landscape code, street yard landscaping, parking lot

00:27:18.760 --> 00:27:22.140
 landscaping, and then parking lot screening.

00:27:22.140 --> 00:27:25.400
 So first, we'll talk about the street yard landscaping.

00:27:25.400 --> 00:27:32.280
 I've kind of highlighted on the exhibit that you see on your screen.

00:27:32.280 --> 00:27:38.400
 It starts where the front building line begins, and then it goes to the right-of-way.

00:27:38.400 --> 00:27:43.760
 So that blue line, that blue hatch line, anything between that and that right-of-way toward

00:27:43.760 --> 00:27:45.840
 the west is that street yard.

00:27:45.840 --> 00:27:54.760
 The current request has within that 40,000 square feet, and the 1988 code required 20%

00:27:54.760 --> 00:28:00.880
 of that to be landscaped with one tree planted every 2,500 square feet of total street yard.

00:28:00.880 --> 00:28:06.740
 And the applicant is proposing that 17,800 square feet of landscaping plus 16 medium

00:28:06.740 --> 00:28:12.120
 and large canopy trees, and that exceeds or meets those minimum requirements.

00:28:12.120 --> 00:28:14.160
 It also had parking lot landscaping.

00:28:14.160 --> 00:28:20.640
 Within that street yard area, the parking lots had to have 5% of either landscape islands,

00:28:20.640 --> 00:28:21.640
 peninsulas, or medians.

00:28:21.640 --> 00:28:26.560
 Once again, the applicant is providing those in excess of that minimum requirement.

00:28:26.560 --> 00:28:32.520
 They're providing 2,900 square feet, about 2,900 square feet of the parking lot landscaping.

00:28:32.520 --> 00:28:40.020
 And then parking lot screening, that 54 dwarf Beaufort holly shrubs where the red squiggly

00:28:40.020 --> 00:28:44.680
 line is, that would be, would serve for that parking lot screening, and that does meet

00:28:44.680 --> 00:28:47.200
 the minimum requirements.

00:28:47.200 --> 00:28:51.960
 So the proposal complies with Criterion 4.

00:28:51.960 --> 00:28:58.320
 Public outreach was done, a newspaper notice, a newspaper website, there was a sign posted

00:28:58.320 --> 00:28:59.760
 on the property.

00:28:59.760 --> 00:29:04.600
 We have sent out 200 and 500 notices, mailing notices.

00:29:04.600 --> 00:29:08.960
 We haven't received any in return.

00:29:08.960 --> 00:29:13.520
 So staff does recommend approval of the detail plan.

00:29:13.520 --> 00:29:19.880
 The site plan and the landscape plan and then those sample building elevations will be incorporated

00:29:19.880 --> 00:29:20.880
 into the ordinance.

00:29:20.880 --> 00:29:24.120
 We wanted to lay out just what those were.

00:29:24.120 --> 00:29:29.880
 First of all, they're proposing that one single story, 30,000 square foot building, the maximum

00:29:29.880 --> 00:29:32.780
 parking on site of 828 spaces.

00:29:32.780 --> 00:29:37.640
 This is one change to your staff report that was in your backup.

00:29:37.640 --> 00:29:40.040
 They're actually proposing 10 large canopy trees.

00:29:40.040 --> 00:29:47.760
 I believe I typed in 12 in error, so it's actually 10 large canopy trees and six medium

00:29:47.760 --> 00:29:49.040
 canopy trees.

00:29:49.040 --> 00:29:52.700
 And then the architecture for all buildings, they haven't fully designed all of their buildings,

00:29:52.700 --> 00:29:56.880
 but we did want to capture what those architectural elements were so we make sure it's consistent

00:29:56.880 --> 00:29:59.040
 with what's existing out there.

00:29:59.040 --> 00:30:04.240
 And so the colonnade for a minimum of 50% of the facade facing the public areas, that

00:30:04.240 --> 00:30:09.600
 varied roof parapet line, and then the decorative towers on at least two corners.

00:30:09.600 --> 00:30:11.760
 We want to make sure that we capture those.

00:30:11.760 --> 00:30:20.040
 So I'm here for any questions, and the applicant should be here this evening as well.

00:30:20.040 --> 00:30:21.040
 Great.

00:30:21.040 --> 00:30:24.840
 Thank you very much, Julie.

00:30:24.840 --> 00:30:26.840
 Does anyone have any questions for Julie?

00:30:26.840 --> 00:30:31.960
 If you raise your hand, I can call you up.

00:30:31.960 --> 00:30:38.760
 The question I had, Julie, is just on a broader picture question, you said the PD was 142

00:30:38.760 --> 00:30:41.540
 acres, if I heard that correctly.

00:30:41.540 --> 00:30:48.040
 Does the city have any mechanism, or what's the city's plan with the remaining acres that

00:30:48.040 --> 00:30:53.920
 are under a 30-year-old PD, because a lot of that isn't developed, when individuals

00:30:53.920 --> 00:31:01.600
 come in to develop that new land, are they going to have retroactive 30-year grandfathering,

00:31:01.600 --> 00:31:07.440
 or I want to learn more about how we can get the remaining land up to current code or out

00:31:07.440 --> 00:31:09.960
 of the 30-year-old PD.

00:31:09.960 --> 00:31:12.840
 Well, this PD does carry forward.

00:31:12.840 --> 00:31:16.960
 There have been some areas, it was actually originally 245 acres.

00:31:16.960 --> 00:31:17.960
 245.

00:31:17.960 --> 00:31:18.960
 Yeah.

00:31:18.960 --> 00:31:25.400
 So there are some areas that have been zoned out of the PD, but this PD is, it remains

00:31:25.400 --> 00:31:28.640
 in effect as the zoning for this site.

00:31:28.640 --> 00:31:32.960
 I think it would be, I'll look to Richard here to see if he wants to chime in, but it

00:31:32.960 --> 00:31:36.280
 would kind of be up to the property owner to see if they wanted to kind of bring it

00:31:36.280 --> 00:31:44.960
 up to the current standards and develop it outside of the PD.

00:31:44.960 --> 00:31:45.960
 That's correct.

00:31:45.960 --> 00:31:49.400
 It would be just like any other zoning district that they would have applied to them.

00:31:49.400 --> 00:31:54.840
 Now, I, correct me if I'm wrong, I haven't read all the PD language apart from this presentation,

00:31:54.840 --> 00:31:59.400
 but there might be some restrictive things that would be in their benefit to get out

00:31:59.400 --> 00:32:01.880
 of the PD if certain projects were to come in.

00:32:01.880 --> 00:32:08.840
 Right, in fact, unrelated to this, there is, we have some other PDs that are governed by

00:32:08.840 --> 00:32:10.920
 interim regulations.

00:32:10.920 --> 00:32:14.960
 They're actually considering zoning out of that.

00:32:14.960 --> 00:32:20.900
 While the tree standards are obviously much more stricter, it does benefit them in landscaping

00:32:20.900 --> 00:32:24.440
 by preserving a huge swath of post oaks.

00:32:24.440 --> 00:32:28.760
 So I think it's just as we look at it on a case by case basis, there is some benefit

00:32:28.760 --> 00:32:32.400
 to actually zone out of some of these older PDs.

00:32:32.400 --> 00:32:37.440
 I'd certainly hope that the city seeks to, where it makes the most sense, bring it to

00:32:37.440 --> 00:32:38.440
 current standards.

00:32:38.440 --> 00:32:42.120
 We worked really hard to get those updated from 1991.

00:32:42.120 --> 00:32:43.120
 They can be applied.

00:32:43.120 --> 00:32:48.040
 I think that's in the interest of the city.

00:32:48.040 --> 00:32:49.040
 Commissioner Ellis.

00:32:49.040 --> 00:32:50.040
 Thanks, Chair.

00:32:50.040 --> 00:32:56.320
 Hey, Julie, I know you said you didn't get any responses to the mail outs, but did we

00:32:56.320 --> 00:32:58.480
 get an email response on this one?

00:32:58.480 --> 00:33:01.000
 I feel like something came in over the weekend.

00:33:01.000 --> 00:33:05.640
 I just want to make sure if we did that it's on the record that we did.

00:33:05.640 --> 00:33:11.440
 I did speak with someone who wanted to ask about whether that Westgate Road that his

00:33:11.440 --> 00:33:14.840
 neighborhood, he lived within the Westgate neighborhood, if it was going to connect.

00:33:14.840 --> 00:33:16.680
 It was more of a mobility question.

00:33:16.680 --> 00:33:17.680
 Okay.

00:33:17.680 --> 00:33:25.340
 But yeah, so I just provided feedback to him about what, you know, what the future plans

00:33:25.340 --> 00:33:28.880
 are for mobility in the area and also put him in touch with our transportation group

00:33:28.880 --> 00:33:30.720
 to see if he had any further questions.

00:33:30.720 --> 00:33:31.720
 Okay.

00:33:31.720 --> 00:33:32.720
 Perfect.

00:33:32.720 --> 00:33:33.720
 Thank you.

00:33:33.720 --> 00:33:34.720
 You bet.

00:33:34.720 --> 00:33:35.720
 Commissioner Beck.

00:33:35.720 --> 00:33:36.720
 Thank you, Chair.

00:33:36.720 --> 00:33:37.720
 Yeah.

00:33:37.720 --> 00:33:43.800
 Are we going to, this is, this is not really directly related to that, but are we renaming

00:33:43.800 --> 00:33:48.920
 that road Bronco way all the way to the 35 feeder?

00:33:48.920 --> 00:33:50.720
 I believe that is the plan.

00:33:50.720 --> 00:33:59.720
 We're still working with Denton ISD to get that name firmed up, but that would probably

00:33:59.720 --> 00:34:00.720
 be the plan.

00:34:00.720 --> 00:34:01.720
 Yes.

00:34:01.720 --> 00:34:02.720
 Okay.

00:34:02.720 --> 00:34:03.720
 Thank you.

00:34:03.720 --> 00:34:04.720
 You bet.

00:34:04.720 --> 00:34:05.720
 Any other questions for Julie?

00:34:05.720 --> 00:34:08.020
 Looking for a show of hand.

00:34:08.020 --> 00:34:09.640
 I do not see any Julie.

00:34:09.640 --> 00:34:11.680
 Thank you very much for your presentation.

00:34:11.680 --> 00:34:18.920
 The next item of business is item 4C, S19-0015D.

00:34:18.920 --> 00:34:20.960
 It is Cindy Jackson's item.

00:34:20.960 --> 00:34:22.760
 Is Cindy available to present?

00:34:22.760 --> 00:34:23.760
 Yep.

00:34:23.760 --> 00:34:24.760
 She's coming up now.

00:34:24.760 --> 00:34:25.840
 Have a look at it shortly.

00:34:25.840 --> 00:34:26.840
 Great.

00:34:26.840 --> 00:34:49.560
 Thank you.

00:34:49.560 --> 00:35:09.320
 Thank you.

00:35:09.320 --> 00:35:27.640
 Okay.

00:35:27.640 --> 00:35:29.320
 We're all set.

00:35:29.320 --> 00:35:30.320
 Can you see the screen?

00:35:30.320 --> 00:35:31.320
 Not yet.

00:35:31.320 --> 00:35:32.320
 I can't see it.

00:35:32.320 --> 00:35:56.080
 How about, there we go.

00:35:56.080 --> 00:36:00.600
 Good evening.

00:36:00.600 --> 00:36:12.360
 Cindy Jackson here to present S19-0015.

00:36:12.360 --> 00:36:18.920
 This is a request for approval of a specific use permit to permit a communications tower

00:36:18.920 --> 00:36:24.600
 with a maximum height of 810 feet mean sea level for a broadband wireless service.

00:36:24.600 --> 00:36:28.680
 The request was originally for 150 foot tall tower.

00:36:28.680 --> 00:36:34.440
 However, it has since been determined that the site is located in the airport height hazard

00:36:34.440 --> 00:36:36.920
 district.

00:36:36.920 --> 00:36:43.080
 The height of structures located within this height hazard district are limited to 810

00:36:43.080 --> 00:36:51.720
 feet mean sea level per section 4.5.8C3.

00:36:51.720 --> 00:37:00.000
 The applicant has agreed to change the request to an 810 foot mean sea level tall structure.

00:37:00.000 --> 00:37:05.160
 The property is located at 3401 Barcelona street at the southeast corner of the intersection

00:37:05.160 --> 00:37:10.880
 of Barcelona and Worthington.

00:37:10.880 --> 00:37:15.840
 The site is zoned mixed use regional MR.

00:37:15.840 --> 00:37:22.720
 Here you see the full site plan.

00:37:22.720 --> 00:37:25.520
 The full site is actually 4.37 acres.

00:37:25.520 --> 00:37:31.240
 However, the site is constrained by this 140 foot drainage easement.

00:37:31.240 --> 00:37:38.320
 So the development impact area is actually 1.05 acres of the entire site.

00:37:38.320 --> 00:37:42.560
 And here you can see the location, the proposed location of the tower within that development

00:37:42.560 --> 00:37:47.520
 impact area.

00:37:47.520 --> 00:37:50.560
 Here's a close up of the development impact area.

00:37:50.560 --> 00:37:54.520
 And you can see that there is a drive off of Barcelona and it is a shared drive with

00:37:54.520 --> 00:37:59.400
 the property that is to the west of the site.

00:37:59.400 --> 00:38:04.760
 The site actually fronts Barcelona, has parking to the side and rear, and the tower is located

00:38:04.760 --> 00:38:11.200
 to the rear of the building.

00:38:11.200 --> 00:38:12.720
 Here's the landscape plan.

00:38:12.720 --> 00:38:17.680
 The applicant is actually proposing to provide 40% of landscape area in the development impact

00:38:17.680 --> 00:38:19.120
 area.

00:38:19.120 --> 00:38:24.880
 That exceeds the required 25% landscaped area by 15%.

00:38:24.880 --> 00:38:30.760
 Six trees will be planted along Barcelona street and the site will have a 30% tree canopy

00:38:30.760 --> 00:38:38.600
 all in conformance with the requirements of the DDC.

00:38:38.600 --> 00:38:40.880
 The building elevations are as follows.

00:38:40.880 --> 00:38:51.320
 The front elevation of the building is this top elevation right up here.

00:38:51.320 --> 00:38:56.640
 The proposed communications tower, this is what it will look like.

00:38:56.640 --> 00:39:04.400
 The height, as I noted previously, it will have a maximum height of 810 feet mean sea

00:39:04.400 --> 00:39:07.040
 level.

00:39:07.040 --> 00:39:13.880
 The applicant right now has an application under review by the FAA and the FAA will determine

00:39:13.880 --> 00:39:15.840
 what the ultimate height is.

00:39:15.840 --> 00:39:21.400
 Cindy, can I pause you real fast and acknowledge Commissioner Beck with a question?

00:39:21.400 --> 00:39:22.400
 Sure.

00:39:22.400 --> 00:39:23.400
 Thank you, Chair.

00:39:23.400 --> 00:39:25.160
 And it's directly germane to this.

00:39:25.160 --> 00:39:32.280
 Given the 800 and whatever you said, sea level limit, what would be a rough height of the

00:39:32.280 --> 00:39:34.040
 tower from the ground?

00:39:34.040 --> 00:39:35.600
 82 feet.

00:39:35.600 --> 00:39:40.120
 Okay, thank you.

00:39:40.120 --> 00:39:43.120
 Sure.

00:39:43.120 --> 00:39:48.240
 The only difference is the applicant is proposing to put a wooden fence to screen the bottom

00:39:48.240 --> 00:39:49.240
 of it.

00:39:49.240 --> 00:39:57.640
 As you know, we have general criteria for approval of all applications.

00:39:57.640 --> 00:39:59.680
 And I go through that in my staff report.

00:39:59.680 --> 00:40:02.640
 I'm not going to cover it here.

00:40:02.640 --> 00:40:10.960
 We have SUP criteria for approval, which I will go into one by one.

00:40:10.960 --> 00:40:14.120
 Criteria one is compatibility with the surrounding area.

00:40:14.120 --> 00:40:18.000
 The surrounding development is comprised of light manufacturing companies, warehouses

00:40:18.000 --> 00:40:20.520
 and a medical clinic.

00:40:20.520 --> 00:40:24.760
 These are primarily industrial in nature with the exception of the medical clinic.

00:40:24.760 --> 00:40:29.000
 The proposed use is compatible with the surrounding uses.

00:40:29.000 --> 00:40:34.260
 The land criteria two is minimal impacts on future development.

00:40:34.260 --> 00:40:37.360
 The land surrounding the site has already been developed.

00:40:37.360 --> 00:40:41.800
 The proposed communications tower and accompanying office building will have minimal impact on

00:40:41.800 --> 00:40:47.880
 the future development of this area.

00:40:47.880 --> 00:40:52.360
 Criteria three, the use conforms with all standards of the DDC and all applicable city

00:40:52.360 --> 00:40:59.320
 codes and yes, it does conform with all standards of the DDC and applicable codes.

00:40:59.320 --> 00:41:06.480
 Criteria four, impacts associated with access, traffic, emergency services, utilities, parking,

00:41:06.480 --> 00:41:12.320
 refuge areas, glare and odor have been adequately mitigated.

00:41:12.320 --> 00:41:17.560
 The proposed tower has been located on the interior of the lot.

00:41:17.560 --> 00:41:21.860
 It's not located within any building setbacks or easements or right of way.

00:41:21.860 --> 00:41:29.440
 There will be minimal if any glare, noise or odor from the tower.

00:41:29.440 --> 00:41:35.960
 The criteria five is in conformance with the comprehensive plan and any other applicable

00:41:35.960 --> 00:41:37.560
 adopted plans.

00:41:37.560 --> 00:41:40.360
 The only plan in effect on this site is a comprehensive plan.

00:41:40.360 --> 00:41:45.720
 The site is designated a business innovation on the future land use map.

00:41:45.720 --> 00:41:50.800
 Typical uses in this area are offices like manufacturing, research and development.

00:41:50.800 --> 00:41:56.560
 The proposed use is in compliance with the future land use designation.

00:41:56.560 --> 00:42:03.720
 Criteria six, the use adversely impacts the health, safety and welfare of the inhabitants

00:42:03.720 --> 00:42:05.600
 of the area and the city of Denton.

00:42:05.600 --> 00:42:10.760
 The use will not adversely affect the health, safety and welfare of the inhabitants of the

00:42:10.760 --> 00:42:12.900
 area and the city of Denton.

00:42:12.900 --> 00:42:20.540
 This will have to comply with all city of Denton criteria as well as any FAA criteria

00:42:20.540 --> 00:42:30.840
 that is imposed on it to ensure that it doesn't adversely affect any citizens.

00:42:30.840 --> 00:42:36.960
 We sent out notifications within 200 and 500 feet as well as put out a newspaper notice.

00:42:36.960 --> 00:42:40.000
 The sign was posted on the site.

00:42:40.000 --> 00:42:48.000
 We received two responses in opposition which I emailed to all of you this afternoon.

00:42:48.000 --> 00:42:56.360
 They comprise 11% of the area within the 200 foot boundary.

00:42:56.360 --> 00:43:01.040
 We received one in favor but that was the applicant so it doesn't count.

00:43:01.040 --> 00:43:06.400
 No neighborhood meetings were held.

00:43:06.400 --> 00:43:11.040
 Staff recommends approval of the request for a communications tower with a maximum height

00:43:11.040 --> 00:43:19.280
 of 810 feet mean sea level as it conforms with the criteria in section 2.4.5E, section

00:43:19.280 --> 00:43:27.360
 2.5.3D for the approval of a specific use permit and section 4.5.8 of the airport height

00:43:27.360 --> 00:43:28.720
 hazard district.

00:43:28.720 --> 00:43:30.800
 And that concludes my presentation.

00:43:30.800 --> 00:43:36.880
 The applicant will be telephoning in later on to answer any questions.

00:43:36.880 --> 00:43:37.880
 Great.

00:43:37.880 --> 00:43:39.560
 Thank you so much, Cindy.

00:43:39.560 --> 00:43:42.360
 Commissioner back has a question.

00:43:42.360 --> 00:43:43.360
 Thank you, chair.

00:43:43.360 --> 00:43:50.960
 Cindy, there was the three for one rule that was in effect before and obviously with a

00:43:50.960 --> 00:43:58.040
 shorter tower, you know, three for one is shorter now but they're not proposing changing

00:43:58.040 --> 00:44:01.080
 that three foot or that three for one rule, right?

00:44:01.080 --> 00:44:02.080
 That's right.

00:44:02.080 --> 00:44:03.080
 Okay.

00:44:03.080 --> 00:44:04.080
 Thank you.

00:44:04.080 --> 00:44:10.120
 Any other questions for Cindy?

00:44:10.120 --> 00:44:11.940
 Cindy thank you very much.

00:44:11.940 --> 00:44:18.460
 Next item for business is item 4D PD20-0001.

00:44:18.460 --> 00:44:27.760
 This item is Haley Zagurski's and I'll turn it over to her when she's ready.

00:44:27.760 --> 00:44:34.760
 Okay.

00:44:34.760 --> 00:45:02.240
 All right.

00:45:02.240 --> 00:45:03.240
 Good evening.

00:45:03.240 --> 00:45:08.080
 This is PD21 for Sagebrook.

00:45:08.080 --> 00:45:12.320
 The request before you this evening is a dual request.

00:45:12.320 --> 00:45:18.240
 This is for an initial zoning of planned development district on approximately 132 acres and a

00:45:18.240 --> 00:45:24.760
 rezoning from residential six or R6 district to PD on approximately 14 acres that are located

00:45:24.760 --> 00:45:26.720
 adjacent to the railroad.

00:45:26.720 --> 00:45:29.400
 The site is a total of 146 acres.

00:45:29.400 --> 00:45:31.240
 It's outlined in yellow on the map.

00:45:31.240 --> 00:45:35.560
 This may be familiar to you all as this developer did come to a work session earlier this year

00:45:35.560 --> 00:45:37.720
 and present their plans.

00:45:37.720 --> 00:45:41.800
 Since then, they have annexed the property and now that that process is completed, they're

00:45:41.800 --> 00:45:45.040
 seeking the desired zoning.

00:45:45.040 --> 00:45:47.840
 So this is a look at our current zoning map.

00:45:47.840 --> 00:45:51.200
 Properties that have been annexed into the city receive a placeholder designation of

00:45:51.200 --> 00:45:52.200
 rural residential.

00:45:52.200 --> 00:45:54.200
 So that's the RR that you see on the map.

00:45:54.200 --> 00:45:58.560
 The frontage of the railroad track is zoned R6.

00:45:58.560 --> 00:46:03.440
 That was part of an annexation down the Fort Worth Drive corridor in the 1960s.

00:46:03.440 --> 00:46:09.960
 And then you can see the proposed zoning map with the entire site zoned to PD.

00:46:09.960 --> 00:46:13.660
 This is a look at the site layout that was included in your backup.

00:46:13.660 --> 00:46:17.640
 So that is a total of 491 lots.

00:46:17.640 --> 00:46:23.360
 Within the residential portion of the development, there's approximately 9.4 acres that are dedicated

00:46:23.360 --> 00:46:25.800
 to HOA open space areas.

00:46:25.800 --> 00:46:29.600
 That includes the two areas circled in yellow on the southern side would be the primary

00:46:29.600 --> 00:46:30.600
 amenity center.

00:46:30.600 --> 00:46:35.040
 The PD indicates that that would contain a pool, a cabana, and a playground.

00:46:35.040 --> 00:46:38.260
 There would also be walking trails throughout that area.

00:46:38.260 --> 00:46:44.480
 On the north side, there's going to be a pond with walking trails and benches.

00:46:44.480 --> 00:46:48.840
 Circled in blue, there is a central spine through the development that will be kind

00:46:48.840 --> 00:46:53.320
 of a boulevard design with the street going one way on either side of a central median

00:46:53.320 --> 00:46:58.040
 that will have a 10-foot combined hike bike trail that will run from Allred Road to Brush

00:46:58.040 --> 00:47:00.400
 Creek Road.

00:47:00.400 --> 00:47:04.600
 And then south of the future Brush Creek Road extension, there's approximately 18 acres

00:47:04.600 --> 00:47:07.700
 of land that they're proposing to dedicate to the city.

00:47:07.700 --> 00:47:12.720
 That would be potentially used by the Parks Department for future trail extensions.

00:47:12.720 --> 00:47:17.160
 Approximately 14 acres of that is within a floodplain ESA.

00:47:17.160 --> 00:47:21.880
 And then circled in red on this map is a portion of an HOA lot where a plugged gas well is

00:47:21.880 --> 00:47:26.920
 located as in anticipation of this development, the developer did ensure that that well was

00:47:26.920 --> 00:47:31.000
 plugged and would be providing for it to be within an open space lot so that no structure

00:47:31.000 --> 00:47:34.560
 would be built over the well.

00:47:34.560 --> 00:47:37.920
 There is a phasing schedule included as part of this PD.

00:47:37.920 --> 00:47:44.360
 Phase one is the area in green that would establish that north-south connection to connect

00:47:44.360 --> 00:47:49.720
 Allred to Brush Creek and provide two points of access for approximately 143 units as well

00:47:49.720 --> 00:47:52.920
 as the primary amenity lot.

00:47:52.920 --> 00:47:56.580
 Phase two would be to the north of that at the intersection of Allred and Bonnie Brain

00:47:56.580 --> 00:47:59.720
 would be for 133 additional units.

00:47:59.720 --> 00:48:04.360
 And then phase three is about 99 units that would include some further extension of Brush

00:48:04.360 --> 00:48:05.500
 Creek Road.

00:48:05.500 --> 00:48:10.560
 And phase four would complete their portion of Brush Creek Road and have 116 residential

00:48:10.560 --> 00:48:11.560
 units.

00:48:11.560 --> 00:48:15.880
 The developer, it will only be developing their half of Brush Creek that's adjacent

00:48:15.880 --> 00:48:20.640
 to the residential portions, that'd be two lanes of the road from Fort Worth Drive to

00:48:20.640 --> 00:48:25.620
 the western boundary of their property.

00:48:25.620 --> 00:48:30.780
 This table compares the plan development standards that they've proposed with the R6 base zoning

00:48:30.780 --> 00:48:33.880
 that they're basing this PD on.

00:48:33.880 --> 00:48:39.440
 This PD would permit only single-family detached dwellings as a primary use along with parks

00:48:39.440 --> 00:48:44.520
 and amenity centers to ensure that future property on the south side can be dedicated

00:48:44.520 --> 00:48:48.840
 for park development and that their amenity center is permitted there, of course.

00:48:48.840 --> 00:48:53.720
 And then they're permitting any of the accessory and temporary uses allowed within the R6 district

00:48:53.720 --> 00:48:56.880
 so that if a resident wanted to install solar panels or something of that nature, that would

00:48:56.880 --> 00:49:00.240
 be permitted.

00:49:00.240 --> 00:49:06.320
 This table shows a comparison of the dimensional standards from the PD to the R6 district.

00:49:06.320 --> 00:49:07.320
 There is one change.

00:49:07.320 --> 00:49:12.520
 The applicant noticed this afternoon that they had typed in a 10-foot side yard setback

00:49:12.520 --> 00:49:13.960
 for all lots within the PD.

00:49:13.960 --> 00:49:18.000
 They intended that only for corner lots to have a 10-foot setback.

00:49:18.000 --> 00:49:22.840
 So for the standard side yard for interior lots, that would be five feet consistent with

00:49:22.840 --> 00:49:25.640
 the R6 district.

00:49:25.640 --> 00:49:30.640
 The only major changes they've proposed in terms of these values is the front yard setback,

00:49:30.640 --> 00:49:34.400
 which would be 20 feet instead of 10 feet, so a little bit larger front yard than what

00:49:34.400 --> 00:49:36.020
 we would normally see.

00:49:36.020 --> 00:49:38.320
 And then they're proposing enhanced landscaping.

00:49:38.320 --> 00:49:43.520
 So whereas a normal subdivision in R6 would have a minimum of one yard tree, they've proposed

00:49:43.520 --> 00:49:48.700
 that for interior lots with two additional ornamental trees on corner lots.

00:49:48.700 --> 00:49:53.440
 And then they've stipulated the minimum standards for front yard landscaping for each home as

00:49:53.440 --> 00:49:59.240
 well as for evergreen screening on the foundations of corner lots.

00:49:59.240 --> 00:50:03.240
 In addition, I do want to note that their minimum open space comes out to 18% overall

00:50:03.240 --> 00:50:05.920
 when you look at the 146 acres.

00:50:05.920 --> 00:50:10.340
 The DDC minimum is 5% dedicated open space for a single-family subdivision with more

00:50:10.340 --> 00:50:15.120
 than 10 lots.

00:50:15.120 --> 00:50:19.560
 As has been noted in the other presentations, there are general criteria applicable to all

00:50:19.560 --> 00:50:20.560
 applications.

00:50:20.560 --> 00:50:23.400
 Those are outlined in detail in your backup, so I won't go through them all here, but did

00:50:23.400 --> 00:50:29.700
 want to note that the proposed PD is in compliance with all of those standards.

00:50:29.700 --> 00:50:35.060
 And then we'll go through each of these specific PD criteria for approval in turn.

00:50:35.060 --> 00:50:39.000
 So criterion one is compliance with the Denton Plan 2030.

00:50:39.000 --> 00:50:43.440
 This subject property is actually a mix of neighborhood mixed use, which is intended

00:50:43.440 --> 00:50:47.680
 for a mixture of commercial and moderate density residential uses.

00:50:47.680 --> 00:50:51.720
 That is, as you can see here on the map, is kind of this entire Bonnie Bray-Fort Worth

00:50:51.720 --> 00:50:56.400
 Drive-Brush Creek intersection has that designation, so that's intended to be a service node for

00:50:56.400 --> 00:50:58.720
 the surrounding residential areas.

00:50:58.720 --> 00:51:02.720
 And then the balance of the property shown in green is designated for rural areas, which

00:51:02.720 --> 00:51:07.320
 is intended for farms, ranches, and very low-density residential development.

00:51:07.320 --> 00:51:11.160
 Generally that is one unit per five acres.

00:51:11.160 --> 00:51:15.800
 But if you look at this broader area, you see this wedge of the pie, if you will, between

00:51:15.800 --> 00:51:19.880
 I-35W and Fort Worth Drive has a wide mixture of uses.

00:51:19.880 --> 00:51:25.400
 We have commercial nodes at 35 and brush are all red, and then over here along Fort Worth

00:51:25.400 --> 00:51:26.400
 Drive.

00:51:26.400 --> 00:51:29.800
 And then to the north of this, we have moderate density residential and a future regional

00:51:29.800 --> 00:51:31.560
 scale park.

00:51:31.560 --> 00:51:35.200
 So it's very unlikely when looking at this little mile and a half wide area that this

00:51:35.200 --> 00:51:39.440
 area will stay rural, especially once the arterial roadway that's intended to go across

00:51:39.440 --> 00:51:41.440
 here is connected.

00:51:41.440 --> 00:51:45.400
 So this is more of a transitional zone, if you will, between the high intensity of the

00:51:45.400 --> 00:51:50.520
 highway across to the east, to where we have this neighborhood service area, and then more

00:51:50.520 --> 00:51:54.920
 rural and low-density residential on the opposite side of Fort Worth Drive.

00:51:54.920 --> 00:52:00.600
 So this PD plan comes in at about 3.3 units per acre and is consistent with the transition

00:52:00.600 --> 00:52:04.680
 that we'd expect to see in this area.

00:52:04.680 --> 00:52:07.880
 The second criterion is whether it complies with the DDC.

00:52:07.880 --> 00:52:11.320
 This table, again, shows that they are meeting or exceeding all of the numerical standards

00:52:11.320 --> 00:52:12.320
 of the code.

00:52:12.320 --> 00:52:16.940
 The PD does specify that for anything not stipulated specifically in the PD, they would

00:52:16.940 --> 00:52:20.640
 meet the DDC standards.

00:52:20.640 --> 00:52:23.960
 Then criterion three is whether it provides for greater building design amenities and

00:52:23.960 --> 00:52:25.360
 connectivity.

00:52:25.360 --> 00:52:29.700
 They are proposing to meet the building design standards within the DDC, and then they would

00:52:29.700 --> 00:52:34.120
 enhance each of those lots aesthetically with some enhanced landscaping, as we looked at

00:52:34.120 --> 00:52:35.120
 earlier.

00:52:35.120 --> 00:52:38.960
 So additional trees and foundation plantings on corner lots, as well as specifying the

00:52:38.960 --> 00:52:42.880
 minimum front yard landscaping for each of those homes in terms of shrubs and ornamental

00:52:42.880 --> 00:52:45.680
 plants.

00:52:45.680 --> 00:52:50.540
 In terms of amenities and open space, as I mentioned, those two large amenity areas account

00:52:50.540 --> 00:52:56.200
 for 6.4% of the residential subdivision area at just over nine acres.

00:52:56.200 --> 00:53:00.920
 Those would feature ponds, walking paths, in addition to the pool and playground amenities.

00:53:00.920 --> 00:53:05.640
 The DDC minimum is 5%, so they are exceeding that.

00:53:05.640 --> 00:53:09.520
 And then rather the development would provide for greater connectivity.

00:53:09.520 --> 00:53:13.840
 We found that it would improve pedestrian and automotive connectivity in this area.

00:53:13.840 --> 00:53:18.440
 The extension of Brush Creek Road will be aiding in the construction of what the city has identified

00:53:18.440 --> 00:53:23.200
 as a high priority roadway, because we do need that east-west connectivity in South

00:53:23.200 --> 00:53:26.440
 Denton that we don't have today in terms of a primary arterial.

00:53:26.440 --> 00:53:28.640
 So this would assist with that.

00:53:28.640 --> 00:53:33.360
 And then on a more local scale, it would provide for pedestrian connectivity between the future

00:53:33.360 --> 00:53:38.120
 park to the north and then the dedicated trail area on the south side of the development

00:53:38.120 --> 00:53:44.520
 with that north-south 10-foot hike and bike trail.

00:53:44.520 --> 00:53:49.560
 Criterion 4 applies to residential uses and seeks to know whether there is a compatible

00:53:49.560 --> 00:53:52.880
 arrangement of buildings' uses and whether it's consistent with the character of the

00:53:52.880 --> 00:53:54.160
 area.

00:53:54.160 --> 00:53:59.240
 So this subdivision is consistent in terms of density and design with other established

00:53:59.240 --> 00:54:02.920
 neighborhoods in South Denton, Country Lakes and Carnegie Ridge are just down the road

00:54:02.920 --> 00:54:04.000
 from here.

00:54:04.000 --> 00:54:07.480
 And it's consistent with the type of moderate density residential development we would expect

00:54:07.480 --> 00:54:11.920
 to see in the portions of Hunter Ranch that are closest to this.

00:54:11.920 --> 00:54:15.560
 The plan and standards that are presented do reflect some additional buffering around

00:54:15.560 --> 00:54:20.640
 the perimeter of the subdivision in terms of landscaping, street trees and fencing that

00:54:20.640 --> 00:54:26.000
 would provide for higher visual aesthetic driving down Brush Creek Road and help screen

00:54:26.000 --> 00:54:30.200
 the subdivision from the railroad right-of-way.

00:54:30.200 --> 00:54:33.640
 The fifth criterion is applicable to non-residential uses.

00:54:33.640 --> 00:54:35.720
 This PD is primarily residential.

00:54:35.720 --> 00:54:39.360
 The only non-residential use is proposed to be parks and open spaces that are compatible

00:54:39.360 --> 00:54:42.760
 with the neighborhood design.

00:54:42.760 --> 00:54:46.240
 The sixth criterion is whether there's the provision of public facilities.

00:54:46.240 --> 00:54:49.600
 And this has several components, so I'll go through each of those in turn.

00:54:49.600 --> 00:54:51.440
 The first of those is schools.

00:54:51.440 --> 00:54:52.920
 We did reach out to Denton ISD.

00:54:52.920 --> 00:54:57.120
 They provided their expected student generation and attendance zones.

00:54:57.120 --> 00:55:02.000
 So 113 elementary school students, 59 middle school students and 74 high school students

00:55:02.000 --> 00:55:05.840
 are expected for a neighborhood of this size.

00:55:05.840 --> 00:55:09.360
 It is zoned into McMath Middle School and Denton High School, which both have capacity

00:55:09.360 --> 00:55:12.880
 at this time to serve all of those students.

00:55:12.880 --> 00:55:18.100
 Denton ISD indicated that at this time, Borman Elementary does not have capacity, but this

00:55:18.100 --> 00:55:21.400
 is expected to be an eight-year build out between those four phases.

00:55:21.400 --> 00:55:26.200
 So there is time for that school to either gain capacity or there's a high likelihood

00:55:26.200 --> 00:55:29.480
 that this would be rezoned into some of the new schools that are planned within the Hunter

00:55:29.480 --> 00:55:33.820
 and Colt Ranch area.

00:55:33.820 --> 00:55:38.360
 In terms of fire and police, there is currently a fire station that you can see here on the

00:55:38.360 --> 00:55:40.760
 north side of the map on Vintage Boulevard.

00:55:40.760 --> 00:55:44.240
 This site is well within that eight-minute response time boundary, which is the standard

00:55:44.240 --> 00:55:46.180
 for the fire department.

00:55:46.180 --> 00:55:50.320
 And then the police department indicated that this is not expected to have a significant

00:55:50.320 --> 00:55:52.720
 or negative impact on their response time.

00:55:52.720 --> 00:55:56.440
 They did want to note that there is a new police facility expected to be built here

00:55:56.440 --> 00:56:01.720
 by the fire station to be operational by 2022 that would increase their ability to respond

00:56:01.720 --> 00:56:05.600
 to this area though.

00:56:05.600 --> 00:56:09.500
 Looking at water and wastewater utilities, the blue lines on the map are the water services

00:56:09.500 --> 00:56:10.500
 that are available.

00:56:10.500 --> 00:56:13.160
 So there's currently water available on Bonnie Bray.

00:56:13.160 --> 00:56:18.280
 However, there is this new line that's been built by the city along All Red.

00:56:18.280 --> 00:56:22.680
 So water services are available and will be extended throughout the site.

00:56:22.680 --> 00:56:24.560
 Wastewater lines are shown in red on the map.

00:56:24.560 --> 00:56:31.000
 You'll notice the closest line is pretty significantly far down Brush Creek.

00:56:31.000 --> 00:56:33.840
 They will be making a connection there at what's called the Graveyard Interceptor and

00:56:33.840 --> 00:56:39.900
 extending that line down Brush Creek to the west across I-35 and the railroad and across

00:56:39.900 --> 00:56:42.440
 this site to provide service to this area.

00:56:42.440 --> 00:56:47.360
 There have been discussions with our engineering department and they're expected to participate

00:56:47.360 --> 00:56:51.400
 with the city to oversize that line to make sure that it can have additional capacity

00:56:51.400 --> 00:56:57.040
 to serve other developments in this area in the future.

00:56:57.040 --> 00:57:01.280
 Looking at streets, of course, our mobility plan reflects Brush Creek Road going across

00:57:01.280 --> 00:57:03.440
 this property as a primary arterial.

00:57:03.440 --> 00:57:07.520
 They will be providing the right-of-way for that road and building two lanes of it on

00:57:07.520 --> 00:57:10.360
 the north side adjacent to the subdivision.

00:57:10.360 --> 00:57:14.200
 The city did a regional traffic study as you may have seen those discussions at City Council

00:57:14.200 --> 00:57:18.120
 over the last year and determined this was the best alignment for that road and that

00:57:18.120 --> 00:57:22.840
 this is a much needed road that is prioritized for South Denton.

00:57:22.840 --> 00:57:27.600
 Looking at the other streets that they have adjacency to, Bonnie Bray, south of All Red,

00:57:27.600 --> 00:57:30.440
 is expected to be closed in the future.

00:57:30.440 --> 00:57:34.120
 With this development and then making the connection at Brush Creek, they're working

00:57:34.120 --> 00:57:38.320
 with the city and the railroad company to close the current unsafe crossing at Bonnie

00:57:38.320 --> 00:57:39.320
 Bray.

00:57:39.320 --> 00:57:41.760
 If you've ever been out there, it connects at a very odd angle.

00:57:41.760 --> 00:57:46.480
 There's not a lot of stacking room for people to get off of the highway to make that turn

00:57:46.480 --> 00:57:48.200
 there across the railroad.

00:57:48.200 --> 00:57:54.400
 So that will be closed and there will be a new properly aligned intersection or a crossing

00:57:54.400 --> 00:57:57.400
 put in there at Brush Creek.

00:57:57.400 --> 00:58:02.280
 All Red Road is expected to be unimproved at this time.

00:58:02.280 --> 00:58:07.000
 The city will improve that street in the future, either when the park develops or when additional

00:58:07.000 --> 00:58:12.960
 development occurs in this area that generates the need for that.

00:58:12.960 --> 00:58:16.560
 Within the site, the primary connection will be off of Brush Creek, so the majority of

00:58:16.560 --> 00:58:19.080
 the traffic will be funneled to that arterial roadway.

00:58:19.080 --> 00:58:23.400
 They will have two additional points of access as options for the residents and for emergency

00:58:23.400 --> 00:58:24.400
 response.

00:58:24.400 --> 00:58:28.560
 One of those will be off of All Red Road and one would be a second point of access further

00:58:28.560 --> 00:58:32.140
 to the west along Brush Creek.

00:58:32.140 --> 00:58:35.960
 This afternoon, I believe you all received an email response that was sent in today that

00:58:35.960 --> 00:58:40.560
 expressed concern about the alignment of Brush Creek, so I wanted to provide this map to give

00:58:40.560 --> 00:58:42.720
 some context to how that decision was made.

00:58:42.720 --> 00:58:47.240
 There were multiple options looked at in the feasibility study, and at the end of the day,

00:58:47.240 --> 00:58:52.240
 it was determined that the most reasonable, once we got some engineering information from

00:58:52.240 --> 00:58:55.560
 this development, the most reasonable alignment was through this property in an angle that

00:58:55.560 --> 00:58:57.940
 follows the floodplain.

00:58:57.940 --> 00:59:01.640
 This is zone A floodplain, so we needed to avoid that.

00:59:01.640 --> 00:59:05.040
 And then we also needed to avoid this gas well site up here so that there wasn't a plugged

00:59:05.040 --> 00:59:09.160
 well under the roadway, which could cause some stability concerns.

00:59:09.160 --> 00:59:14.000
 So that road essentially had to thread the needle between those two obstacles to connect

00:59:14.000 --> 00:59:18.280
 to All Red at a reasonable angle, and so the alignment shown on their plan is the alignment

00:59:18.280 --> 00:59:25.760
 that the city felt was best for this roadway extension.

00:59:25.760 --> 00:59:29.960
 The final component of criterion six is accessibility to parks.

00:59:29.960 --> 00:59:35.800
 So the area shown in green on your map is the future Southwest Park, which will be a

00:59:35.800 --> 00:59:37.800
 regional scale park.

00:59:37.800 --> 00:59:42.300
 The city is currently negotiating with a consultant on that master plan for that park development,

00:59:42.300 --> 00:59:45.680
 so that is coming in the near future.

00:59:45.680 --> 00:59:49.500
 And additionally, as I mentioned earlier, the area south of Brush Creek down here with

00:59:49.500 --> 00:59:53.280
 the floodplain is proposed to be dedicated to the city to provide future trail connectivities

00:59:53.280 --> 00:59:55.420
 through the floodplain.

00:59:55.420 --> 00:59:58.640
 And park dedication and development fees will apply to this at the time of platting and

00:59:58.640 --> 00:59:59.640
 permitting.

00:59:59.640 --> 01:00:00.640
 Hey, can I pause you?

01:00:00.640 --> 01:00:01.640
 Excuse me.

01:00:01.640 --> 01:00:02.640
 Can I pause you real fast?

01:00:02.640 --> 01:00:04.720
 I think Commissioner Beck has a question.

01:00:04.720 --> 01:00:07.640
 Yes, thank you, Chair.

01:00:07.640 --> 01:00:10.120
 Can you go back to the floodplain map?

01:00:10.120 --> 01:00:12.640
 I think that's the previous one.

01:00:12.640 --> 01:00:19.800
 So the emails that you communicated to us, we're the go through the corner of that property.

01:00:19.800 --> 01:00:26.600
 I guess that's not directly related to this individual property, but it's germane.

01:00:26.600 --> 01:00:31.360
 We're going to eminent domain that and the second question is Brush Creek is our road

01:00:31.360 --> 01:00:35.040
 or somebody else's road?

01:00:35.040 --> 01:00:37.720
 Brush Creek is a city road, I believe.

01:00:37.720 --> 01:00:40.920
 So that is a city roadway.

01:00:40.920 --> 01:00:47.760
 When I talked to our city engineering department this afternoon, they communicated that yes,

01:00:47.760 --> 01:00:51.820
 sometime in the future, the city would negotiate with the adjacent property owner to acquire

01:00:51.820 --> 01:00:58.080
 that right of way that's not expected to occur for 10 to 15 years, probably, based on the

01:00:58.080 --> 01:01:02.640
 expected timing of the Hunter Cole Ranch and other developments in this area.

01:01:02.640 --> 01:01:06.840
 So that would be a future negotiation that the city would have to go through to acquire

01:01:06.840 --> 01:01:10.360
 that right of way when the road needs to be expanded.

01:01:10.360 --> 01:01:11.360
 Okay.

01:01:11.360 --> 01:01:17.720
 And can you wiggle your mouse and show me where the access points you were referencing

01:01:17.720 --> 01:01:19.320
 are going to be?

01:01:19.320 --> 01:01:20.320
 Yes.

01:01:20.320 --> 01:01:25.400
 If we need to, we can go back to the site plan.

01:01:25.400 --> 01:01:29.120
 On the north side, their connection will align with what's planned to be the primary entrance

01:01:29.120 --> 01:01:31.200
 to the park along Allred.

01:01:31.200 --> 01:01:35.240
 On the south side, their primary entry would be roughly in this area and then there would

01:01:35.240 --> 01:01:38.000
 be a secondary access point over here on the western side.

01:01:38.000 --> 01:01:39.000
 Okay.

01:01:39.000 --> 01:01:40.000
 Thank you.

01:01:40.000 --> 01:01:45.800
 Commissioners, just seeing the time, being respectful for the public hearing at 630.

01:01:45.800 --> 01:01:50.480
 If we could hold other questions about this item until public hearing, certainly have

01:01:50.480 --> 01:01:54.680
 the discussion, but if we could hold them until public hearing, let Haley wrap up.

01:01:54.680 --> 01:01:57.760
 I think that would be good so we get to public hearing.

01:01:57.760 --> 01:01:59.920
 Haley, please continue.

01:01:59.920 --> 01:02:01.960
 All right.

01:02:01.960 --> 01:02:04.880
 Just a couple more slides here.

01:02:04.880 --> 01:02:08.880
 There was a response submitted online, I believe, regarding the fiscal impacts of this, so I

01:02:08.880 --> 01:02:11.960
 wanted to provide this detail for you all.

01:02:11.960 --> 01:02:15.720
 Just some of the highlights of the fiscal impact analysis that were done as part of

01:02:15.720 --> 01:02:17.840
 the annexation.

01:02:17.840 --> 01:02:21.720
 Currently with the agriculture exemption on the site, the property tax revenue is about

01:02:21.720 --> 01:02:24.240
 $377.

01:02:24.240 --> 01:02:30.200
 The estimated annual tax revenue at build out would be $967,000 roughly.

01:02:30.200 --> 01:02:35.120
 And then the difference when you net out the cost of services would be about $87,000 there.

01:02:35.120 --> 01:02:38.760
 They do have substantial amounts of permit and inspection and impact fees that would

01:02:38.760 --> 01:02:43.500
 be paid for this development at our current rates, that would be about $8.5 million.

01:02:43.500 --> 01:02:48.560
 Fiscal sales tax over the eight years related to the construction of this would be about

01:02:48.560 --> 01:02:50.460
 $1.2 million.

01:02:50.460 --> 01:02:54.280
 But I also wanted to bring this back around to not just the fiscal impacts, but also the

01:02:54.280 --> 01:02:56.640
 qualitative impacts of the development.

01:02:56.640 --> 01:03:02.520
 The developer did plug that gas well in anticipation of bringing this development into the city.

01:03:02.520 --> 01:03:06.720
 They are dedicating a substantial amount of right of way and constructing a significant

01:03:06.720 --> 01:03:10.960
 portion of Rush Creek Road, which is a city asset that we need.

01:03:10.960 --> 01:03:15.880
 And then they are assisting with the improvement of the railroad crossing at 377 that would

01:03:15.880 --> 01:03:20.800
 eliminate that very unsafe crossing we have today at Bonnie Bray in 377.

01:03:20.800 --> 01:03:25.320
 And then also just the amount of park dedication and trails that we would potentially get out

01:03:25.320 --> 01:03:29.080
 of this development and those connections that we would have as the Hunter and Coal

01:03:29.080 --> 01:03:35.720
 Ranch developments occur and provide that greater trail connectivity to the West.

01:03:35.720 --> 01:03:39.720
 Notification was sent regarding this request.

01:03:39.720 --> 01:03:44.840
 Because of the time of this meeting, there had been one response in favor that was provided

01:03:44.840 --> 01:03:46.000
 in your backup.

01:03:46.000 --> 01:03:50.120
 The additional response in opposition was provided via email today, and that was this

01:03:50.120 --> 01:03:52.320
 property immediately to the West.

01:03:52.320 --> 01:03:57.360
 And then I did want to read, I have two additional responses that we found at our office today.

01:03:57.360 --> 01:04:01.200
 That's been closed, so there wasn't a lot of checking of the fax machines, but we did

01:04:01.200 --> 01:04:06.440
 get two additional responses from the properties that are shown in red to the east.

01:04:06.440 --> 01:04:10.520
 Both are opposed as well, and I can read those during the public hearing to put them on the

01:04:10.520 --> 01:04:11.520
 record.

01:04:11.520 --> 01:04:14.840
 The applicant did hold a neighborhood meeting in January and had about 12 attendees at the

01:04:14.840 --> 01:04:21.200
 meeting and they presented the same slides that were shown to you all at the work session.

01:04:21.200 --> 01:04:24.640
 So staff is recommending approval of this request as it complies with both our general

01:04:24.640 --> 01:04:27.720
 and our PD specific criteria for approval.

01:04:27.720 --> 01:04:31.880
 And if this gets a vote from the P&Z tonight, it would move forward to public hearing at

01:04:31.880 --> 01:04:34.400
 City Council on June 2nd.

01:04:34.400 --> 01:04:36.840
 I'm happy to answer any other questions if there's time.

01:04:36.840 --> 01:04:39.920
 Haley, thank you for the presentation.

01:04:39.920 --> 01:04:45.280
 I think we can hold questions to the public hearing if we have any additional.

01:04:45.280 --> 01:04:50.200
 And with that, that concludes our work session agenda for this evening.

01:04:50.200 --> 01:04:55.480
 If it's copacetic with everyone, let's just roll right into the public hearing.

01:04:55.480 --> 01:05:00.320
 We have no need for a break to move into council chambers.

01:05:00.320 --> 01:05:04.560
 So we'll go ahead and roll right into the public hearing.

01:05:04.560 --> 01:05:10.880
 Let me reset my agenda.

01:05:10.880 --> 01:05:17.040
 Just to reset everyone, this is the public hearing for the Planning and Zoning Commission.

01:05:17.040 --> 01:05:20.000
 Actually, check, I need to close that work session.

01:05:20.000 --> 01:05:22.640
 Let's, should I close that work session?

01:05:22.640 --> 01:05:25.480
 Close work and then regular meeting.

01:05:25.480 --> 01:05:26.480
 Perfect.

01:05:26.480 --> 01:05:28.360
 It's a learning curve.

01:05:28.360 --> 01:05:33.640
 I'll close the work session at 6 42.

01:05:33.640 --> 01:05:37.240
 Good evening, ladies and gentlemen, welcome to the Planning and Zoning Commission public

01:05:37.240 --> 01:05:41.560
 hearing meeting for Wednesday, May 6, 2020.

01:05:41.560 --> 01:05:46.440
 Seeing that we do have a quorum, I will call the meeting to order at 6 43.

01:05:46.440 --> 01:05:50.960
 The first item of business is to consider approval of the planning and zoning minutes

01:05:50.960 --> 01:05:55.160
 for April 8th.

01:05:55.160 --> 01:05:56.160
 Commissioner Smith.

01:05:56.160 --> 01:05:58.240
 Make a motion to approve.

01:05:58.240 --> 01:06:01.880
 We have a first for approval.

01:06:01.880 --> 01:06:02.880
 Commissioner Ellis.

01:06:02.880 --> 01:06:03.880
 Second.

01:06:03.880 --> 01:06:06.500
 We have a first and a second for approval.

01:06:06.500 --> 01:06:10.200
 Any discussion on this item?

01:06:10.200 --> 01:06:13.120
 Seeing none, I'll call for a vote via roll call.

01:06:13.120 --> 01:06:14.120
 Commissioner Beck.

01:06:14.120 --> 01:06:15.120
 Aye.

01:06:15.120 --> 01:06:16.120
 Commissioner Ellis.

01:06:16.120 --> 01:06:17.120
 Aye.

01:06:17.120 --> 01:06:18.120
 Commissioner Pernetta.

01:06:18.120 --> 01:06:19.120
 Aye.

01:06:19.120 --> 01:06:20.120
 Commissioner Smith.

01:06:20.120 --> 01:06:21.120
 Aye.

01:06:21.120 --> 01:06:22.120
 Commissioner Cole.

01:06:22.120 --> 01:06:23.120
 Aye.

01:06:23.120 --> 01:06:24.120
 Commissioner Anderson.

01:06:24.120 --> 01:06:25.120
 Aye.

01:06:25.120 --> 01:06:29.800
 Motion carries seven zero.

01:06:29.800 --> 01:06:32.080
 Next item of business is our consent agenda.

01:06:32.080 --> 01:06:36.500
 Chair will entertain a motion, Commissioner Smith.

01:06:36.500 --> 01:06:37.960
 Make a motion to approve.

01:06:37.960 --> 01:06:41.320
 We have a first for approval, Commissioner Anderson.

01:06:41.320 --> 01:06:42.320
 Second the motion.

01:06:42.320 --> 01:06:45.320
 We have a first and a second for approval of the consent agenda.

01:06:45.320 --> 01:06:48.320
 Any discussion?

01:06:48.320 --> 01:06:51.220
 Seeing none, I'll call a vote via roll call.

01:06:51.220 --> 01:06:52.220
 Commissioner Beck.

01:06:52.220 --> 01:06:53.220
 Aye.

01:06:53.220 --> 01:06:54.220
 Commissioner Ellis.

01:06:54.220 --> 01:06:55.220
 Aye.

01:06:55.220 --> 01:06:56.220
 Commissioner Pernetta.

01:06:56.220 --> 01:06:57.220
 Aye.

01:06:57.220 --> 01:06:58.220
 Commissioner Smith.

01:06:58.220 --> 01:06:59.220
 Aye.

01:06:59.220 --> 01:07:00.220
 Commissioner Cole.

01:07:00.220 --> 01:07:01.220
 Aye.

01:07:01.220 --> 01:07:02.680
 Commissioner Anderson.

01:07:02.680 --> 01:07:03.680
 Aye.

01:07:03.680 --> 01:07:06.840
 Consent agenda is approved seven zero.

01:07:06.840 --> 01:07:09.080
 Next item of business is our individual consideration.

01:07:09.080 --> 01:07:17.280
 We'll start, we only have one, item 3A, ZCP20-0002.

01:07:17.280 --> 01:07:28.080
 And Haley, if you could provide a summary of the presentation.

01:07:28.080 --> 01:07:38.160
 All right.

01:07:38.160 --> 01:07:41.500
 So Haley Zagurski with the Planning Department.

01:07:41.500 --> 01:07:46.520
 This is a site plan approval for the Residences at Razor Ranch Subdivision.

01:07:46.520 --> 01:07:51.860
 I'll quickly go through the slides for anyone in the public.

01:07:51.860 --> 01:07:55.760
 So the request before you is for approval of a site plan that features single family

01:07:55.760 --> 01:07:59.520
 detached and single family attached or townhome uses.

01:07:59.520 --> 01:08:03.560
 The property is the 40 acres outlined in yellow on the map that's located just north of the

01:08:03.560 --> 01:08:06.360
 Razor Ranch Marketplace.

01:08:06.360 --> 01:08:09.760
 Preliminary plat has been approved for the entire subdivision and a final plat has been

01:08:09.760 --> 01:08:15.360
 approved for phase one, which is the eastern half of the development.

01:08:15.360 --> 01:08:16.800
 Just a little bit of background.

01:08:16.800 --> 01:08:22.680
 This is in accordance with the 2008 and 2009 Razor Ranch ordinances that required approval

01:08:22.680 --> 01:08:24.720
 of a site plan and landscape plan.

01:08:24.720 --> 01:08:28.320
 Building elevations were excluded from that.

01:08:28.320 --> 01:08:32.560
 The criteria for approval or whether it complies with the concept plan, whether it provides

01:08:32.560 --> 01:08:38.120
 for compatible arrangement of uses and buildings that wouldn't affect neighboring properties,

01:08:38.120 --> 01:08:41.760
 whether it provides for adequate and safe vehicular circulation, and if it complies

01:08:41.760 --> 01:08:45.120
 with the overlay district standards.

01:08:45.120 --> 01:08:51.700
 So with regards to those standards, this site does have a mix of zoning of NR3 and NRMU12.

01:08:51.700 --> 01:08:55.440
 The overlay district permits single family and townhome uses in this area.

01:08:55.440 --> 01:08:58.000
 So both uses proposed are permitted.

01:08:58.000 --> 01:09:02.360
 There are architectural and landscape standards that were adopted in 2018 that this was analyzed

01:09:02.360 --> 01:09:03.960
 for compliance with.

01:09:03.960 --> 01:09:08.920
 Those standards limited this to no more than 70 single family and 230 townhomes plus an

01:09:08.920 --> 01:09:10.880
 amenity center.

01:09:10.880 --> 01:09:12.520
 The unit counts are well within that.

01:09:12.520 --> 01:09:15.800
 I wanted to note the amenity center is not part of this request, and we'll come back

01:09:15.800 --> 01:09:19.380
 as a separate site plan in the future.

01:09:19.380 --> 01:09:22.640
 This is a look at the concept plan that they're required to comply with.

01:09:22.640 --> 01:09:27.000
 It reflected, again, single family and townhome uses, which are what is proposed.

01:09:27.000 --> 01:09:31.960
 This plan had a large amount of open space on it that was intended for gas well drilling

01:09:31.960 --> 01:09:32.960
 sites.

01:09:32.960 --> 01:09:36.520
 Those were removed from the Razor Ranch overlay district and opened up more of this property

01:09:36.520 --> 01:09:39.580
 for residential use.

01:09:39.580 --> 01:09:40.900
 This is a look at the site plan.

01:09:40.900 --> 01:09:45.560
 It is in compliance with the approved layout in terms of lots and streets.

01:09:45.560 --> 01:09:50.900
 You can see 65 single family lots on the north side that provide a buffer and a transition

01:09:50.900 --> 01:09:55.580
 with similar lot sizes for the existing subdivision to the north before you hit the townhomes

01:09:55.580 --> 01:09:58.000
 and commercial development to the south.

01:09:58.000 --> 01:10:01.880
 There are 215 townhome lots and 31 HOA lots.

01:10:01.880 --> 01:10:07.360
 Those HOA lots do include the private alleyways that serve as access to the townhomes.

01:10:07.360 --> 01:10:11.440
 The other streets serving the single family homes and providing those primary corridors

01:10:11.440 --> 01:10:15.440
 from east to west through the site are public streets.

01:10:15.440 --> 01:10:18.960
 They would connect at Augusta Drive and provide that stub out that then meanders through the

01:10:18.960 --> 01:10:20.720
 site to get to Bonnie Bray.

01:10:20.720 --> 01:10:24.920
 They do have a connection point to the driveway stub coming from the marketplace that would

01:10:24.920 --> 01:10:29.560
 be gated to restrict access so that commercial access could not enter this site to cut through

01:10:29.560 --> 01:10:32.480
 to Bonnie Bray.

01:10:32.480 --> 01:10:34.800
 This is the proposed landscape plan.

01:10:34.800 --> 01:10:39.100
 Since this is primarily residential development, the details of individual lot landscaping

01:10:39.100 --> 01:10:42.040
 will come with permitting.

01:10:42.040 --> 01:10:45.480
 The lots do have to comply with the overlay district, which requires street trees at one

01:10:45.480 --> 01:10:49.920
 per 45 feet, and that is shown here on the plan.

01:10:49.920 --> 01:10:52.840
 And then they had minimum landscaping for the zoning.

01:10:52.840 --> 01:10:56.280
 So each single family lot will have to maintain 50% landscaping.

01:10:56.280 --> 01:11:01.680
 The NRMU 12 area required 40% landscaping averaged across the entire townhome area,

01:11:01.680 --> 01:11:05.240
 and they are at 45% with this plan.

01:11:05.240 --> 01:11:09.720
 These are the sample townhome elevations reflecting consistency with the razor ranch standards

01:11:09.720 --> 01:11:13.080
 for neutral color palette and masonry materials.

01:11:13.080 --> 01:11:16.040
 And then these are some of the samples of the types of single family homes that are

01:11:16.040 --> 01:11:17.980
 intended to be developed here.

01:11:17.980 --> 01:11:22.180
 And staff is recommending approval of this request as it meets the established requirements.

01:11:22.180 --> 01:11:26.440
 And I believe the applicant has called into the meeting and would be available for questions

01:11:26.440 --> 01:11:27.440
 as well.

01:11:27.440 --> 01:11:33.360
 >> Great, thank you so much, Haley, is there any questions for Haley?

01:11:33.360 --> 01:11:34.360
 Chris or Beck?

01:11:34.360 --> 01:11:39.000
 >> Yeah, I forgot to ask this at work session, but is there going to be pedestrian access

01:11:39.000 --> 01:11:47.860
 along that connection to the razor ranch?

01:11:47.860 --> 01:11:51.960
 >> When I last asked the developer about that, they did not want to provide gated pedestrian

01:11:51.960 --> 01:11:52.960
 access there.

01:11:52.960 --> 01:11:57.200
 They thought there could be some security concerns, but I believe they might be amenable

01:11:57.200 --> 01:12:02.440
 to that if you wanted to direct that question to the applicant.

01:12:02.440 --> 01:12:10.720
 >> Yeah, I'm just concerned about pedestrians going down the west road whose name escapes

01:12:10.720 --> 01:12:16.280
 me at the moment or down Bonnie Bray to get around to shopping, which would be adjacent,

01:12:16.280 --> 01:12:22.000
 which would seem very convenient, but with no pedestrian access, they'd have to drive.

01:12:22.000 --> 01:12:26.280
 >> Correct, there's that vehicular access there, but the plan currently does not reflect

01:12:26.280 --> 01:12:28.800
 the gated pedestrian access.

01:12:28.800 --> 01:12:32.840
 >> Okay, thank you.

01:12:32.840 --> 01:12:41.520
 >> Any other questions for Haley or the applicant?

01:12:41.520 --> 01:12:47.480
 Okay, seeing none, the chair will entertain a motion.

01:12:47.480 --> 01:12:48.480
 Commissioner Smith?

01:12:48.480 --> 01:12:51.240
 >> I make a motion to approve.

01:12:51.240 --> 01:12:52.240
 >> We have a first for approval.

01:12:52.240 --> 01:12:56.400
 Commissioner Pernetta, did I see your hand pop up?

01:12:56.400 --> 01:12:57.400
 >> Yes, I second.

01:12:57.400 --> 01:12:59.280
 >> Perfect, we have a first and a second for approval.

01:12:59.280 --> 01:13:03.480
 Is there any discussion on this item?

01:13:03.480 --> 01:13:06.200
 Seeing none, I will call a vote via roll call.

01:13:06.200 --> 01:13:07.200
 Commissioner Beck?

01:13:07.200 --> 01:13:08.200
 >> Aye.

01:13:08.200 --> 01:13:09.200
 >> Commissioner Ellis?

01:13:09.200 --> 01:13:10.200
 >> Aye.

01:13:10.200 --> 01:13:11.200
 >> Commissioner Smith?

01:13:11.200 --> 01:13:12.200
 >> Aye.

01:13:12.200 --> 01:13:13.200
 >> Commissioner Cole?

01:13:13.200 --> 01:13:14.200
 >> Aye.

01:13:14.200 --> 01:13:15.200
 >> Commissioner Anderson?

01:13:15.200 --> 01:13:16.200
 >> Aye.

01:13:16.200 --> 01:13:17.360
 >> Commissioner Pernetta?

01:13:17.360 --> 01:13:18.360
 >> Aye.

01:13:18.360 --> 01:13:24.480
 >> The motion carries 7-0, the next item of business is our public hearing items, we'll

01:13:24.480 --> 01:13:33.300
 start with item 4A, Z20-0005, the applicant is asking to postpone this indefinitely.

01:13:33.300 --> 01:13:40.600
 We talked in work session to a date uncertain, but we're needing a motion for postponement

01:13:40.600 --> 01:13:41.600
 indefinitely.

01:13:41.600 --> 01:13:42.600
 Commissioner Smith?

01:13:42.600 --> 01:13:48.940
 >> Make a motion to postpone a date uncertain.

01:13:48.940 --> 01:13:51.720
 >> Commissioner Smith, are you amenable to postponing indefinitely?

01:13:51.720 --> 01:13:54.720
 >> A date indefinitely is fine.

01:13:54.720 --> 01:13:55.720
 >> Perfect.

01:13:55.720 --> 01:13:56.720
 Commissioner Beck, did I see your hand?

01:13:56.720 --> 01:13:57.720
 >> Yes, I second.

01:13:57.720 --> 01:14:04.680
 >> We have a first and a second to postpone indefinitely, any discussion?

01:14:04.680 --> 01:14:07.900
 Seeing none, I will call for a vote via roll call.

01:14:07.900 --> 01:14:08.900
 Commissioner Beck?

01:14:08.900 --> 01:14:09.900
 >> Aye.

01:14:09.900 --> 01:14:10.900
 >> Commissioner Ellis?

01:14:10.900 --> 01:14:11.900
 >> Aye.

01:14:11.900 --> 01:14:12.900
 >> Commissioner Smith?

01:14:12.900 --> 01:14:13.900
 >> Aye.

01:14:13.900 --> 01:14:14.900
 >> Commissioner Cole?

01:14:14.900 --> 01:14:15.900
 >> Aye.

01:14:15.900 --> 01:14:16.900
 >> Commissioner Anderson?

01:14:16.900 --> 01:14:17.900
 >> Aye.

01:14:17.900 --> 01:14:18.900
 >> Commissioner Pernetta?

01:14:18.900 --> 01:14:19.900
 >> Aye.

01:14:19.900 --> 01:14:32.400
 >> Motion carries 7-0, the next item of business is item 4B, PDA 20-0001, this item is Julie

01:14:32.400 --> 01:14:52.400
 Wyatt and I will invite her for presentation.

01:14:52.400 --> 01:14:58.280
 So I'm presenting PDA 21 Stonehill Center, the request is for a detailed plan amendment

01:14:58.280 --> 01:15:04.820
 for plan development 142, also known as Stonehill Center, the intent is to add a 30,000 square

01:15:04.820 --> 01:15:10.280
 foot building for a single tenant to accommodate the workforce solutions of North Texas.

01:15:10.280 --> 01:15:17.160
 The subject property is outlined in yellow, it is a 19.6 acre site located on the east

01:15:17.160 --> 01:15:22.640
 side of I-35 and west gate drive, north of west gate drive.

01:15:22.640 --> 01:15:30.560
 PDs prior to 2019 per an ordinance that was approved last fall follow the regulations

01:15:30.560 --> 01:15:38.000
 that were in place when they were adopted, so in this case the PD 142 follows the 1991

01:15:38.000 --> 01:15:39.000
 development code.

01:15:39.000 --> 01:15:43.840
 The 1991 development code had a two-step process for plan developments, first the general concept

01:15:43.840 --> 01:15:50.240
 plan that established the PD, created the permitted land uses, development standards

01:15:50.240 --> 01:15:54.800
 and project boundaries, that remains in place, it is the zoning for the property.

01:15:54.800 --> 01:15:59.920
 The second step is the detailed plan, it's essentially a site plan, it is particular

01:15:59.920 --> 01:16:08.720
 to an individual site and an individual development, talks about landscaping, the building placement,

01:16:08.720 --> 01:16:11.840
 parking access, those sorts of elements.

01:16:11.840 --> 01:16:18.800
 So the concept plan for PD 142 was approved in 1991, the original PD boundaries took in

01:16:18.800 --> 01:16:25.040
 245 acres, there has been some rezoned out of that PD, but it does maintain those boundaries

01:16:25.040 --> 01:16:31.260
 that are outlined in the dark blue hatch line.

01:16:31.260 --> 01:16:37.360
 That original PD did lay out the permitted uses and development standards within PD 142,

01:16:37.360 --> 01:16:43.560
 and you can see that Stonehill center outlined in black is central to that PD, it's in the

01:16:43.560 --> 01:16:44.560
 middle of it.

01:16:44.560 --> 01:16:51.040
 A detailed plan was originally approved for the site in 1992, it included four multi-tenant

01:16:51.040 --> 01:16:55.880
 retail buildings and 806 parking spaces.

01:16:55.880 --> 01:17:01.960
 There were subsequent modifications to that detail plan, and this culminating in the 1993

01:17:01.960 --> 01:17:08.200
 detail plan, it added an additional building so that there were five buildings, two through

01:17:08.200 --> 01:17:17.640
 five were eventually built along with 945 parking spaces, building one was never built,

01:17:17.640 --> 01:17:21.920
 so the approval for that building has expired.

01:17:21.920 --> 01:17:27.920
 So the subject request really is adding back in that building one, the existing buildings

01:17:27.920 --> 01:17:34.200
 range in size from about 26,000 square feet to 47,000 square feet, as I said, 945 parking

01:17:34.200 --> 01:17:41.800
 spaces are on site, and three access points, one to the south to Westgate, one to the west

01:17:41.800 --> 01:17:47.680
 to the I-35 frontage road, and then the site connects to loop 288 through the adjacent

01:17:47.680 --> 01:17:51.180
 commercial lot, it's a restaurant, I believe.

01:17:51.180 --> 01:17:57.080
 The proposal would add, as I said, that 30,000 square foot building, it's outlined in yellow,

01:17:57.080 --> 01:18:01.040
 plus some landscaping and access would remain the same.

01:18:01.040 --> 01:18:08.400
 When we zoom in to the specific area, you see that building in yellow again, it would

01:18:08.400 --> 01:18:16.560
 reduce the on-site parking to 828 spaces, and it would include about 17,000 square foot

01:18:16.560 --> 01:18:22.840
 of landscaping, planting of 16 large and medium canopy trees, which would increase the on-site

01:18:22.840 --> 01:18:28.980
 canopy to about 16,802 square feet at maturity.

01:18:28.980 --> 01:18:34.980
 They will also, if approved, replace the screen hedge that's existing now, it will be similar

01:18:34.980 --> 01:18:40.440
 to what's existing now, that sort of undulating hedge, and the vehicular circulation pattern

01:18:40.440 --> 01:18:43.600
 would remain unchanged.

01:18:43.600 --> 01:18:48.400
 The architectural elements, the pictures on the top, those are the renderings of what

01:18:48.400 --> 01:18:53.760
 they're proposing, and they are very similar in detail and styling to the existing development,

01:18:53.760 --> 01:19:01.480
 which is the two pictures to the south, so they've borrowed a lot of those details from

01:19:01.480 --> 01:19:03.920
 what is existing.

01:19:03.920 --> 01:19:07.640
 The criteria for approval are in the 91 ordinates, and there are four of them, and we'll go over

01:19:07.640 --> 01:19:09.880
 them individually.

01:19:09.880 --> 01:19:15.280
 First is the, does the proposal comply with the concept plan that was adopted?

01:19:15.280 --> 01:19:21.680
 The purpose of PD 142 was to create an urban center, a hub of activity, employment and

01:19:21.680 --> 01:19:27.840
 economic activity there at the intersection of loop 288 and I-35.

01:19:27.840 --> 01:19:32.760
 Previous detail plans were not use specific, they were kind of limited to that building

01:19:32.760 --> 01:19:36.800
 arrangement and the parking signage and landscaping.

01:19:36.800 --> 01:19:43.080
 When a particular tenant seeks a certificate of occupancy in PD 142, we refer to that,

01:19:43.080 --> 01:19:47.940
 those permitted uses in that original concept plan for guidance.

01:19:47.940 --> 01:19:54.360
 We have checked the proposed uses against that concept plan, and they are permitted,

01:19:54.360 --> 01:19:57.800
 kind of that office use with the community center.

01:19:57.800 --> 01:20:03.400
 And then the dimensions, the proposed dimensions are also consistent with the concept plan,

01:20:03.400 --> 01:20:07.160
 so it does meet the first criteria for approval.

01:20:07.160 --> 01:20:12.940
 The second criterion for approval is compatible arrangement of the buildings and uses on site,

01:20:12.940 --> 01:20:18.260
 and then if the proposal would adversely affect the adjoining property.

01:20:18.260 --> 01:20:24.040
 So first we'll look at on site, the building arrangement, the proposed building is consistent

01:20:24.040 --> 01:20:27.300
 with the general building scale and architectural themes.

01:20:27.300 --> 01:20:31.240
 It also completes that unified development pattern that was established with the original

01:20:31.240 --> 01:20:32.240
 plan.

01:20:32.240 --> 01:20:39.940
 The daily activities associated with the proposed use are consistent with the existing daily

01:20:39.940 --> 01:20:45.560
 activities on the site as well as those existing uses, so we don't anticipate any adverse or

01:20:45.560 --> 01:20:47.360
 negative impacts.

01:20:47.360 --> 01:20:51.480
 And then the applicant did provide the traffic generation rates for the proposal, it would

01:20:51.480 --> 01:20:59.840
 generate approximately 292 trips per day, 44 morning peak and then 33 evening peak consistent

01:20:59.840 --> 01:21:03.000
 with what is on the site.

01:21:03.000 --> 01:21:08.400
 Outside of the plan, first we'll look at the mobility improvements in the area that will

01:21:08.400 --> 01:21:10.560
 be coming in the future.

01:21:10.560 --> 01:21:17.040
 The Westgate Road that is currently improved on the south side of the property but ends

01:21:17.040 --> 01:21:21.920
 at the eastern edge will be extended at some point in the future to connect all the way

01:21:21.920 --> 01:21:27.280
 to Bonnie Bray, that will provide additional connectivity to the site.

01:21:27.280 --> 01:21:32.000
 When we look at that additional connectivity and the surrounding development, we see first

01:21:32.000 --> 01:21:36.720
 there's an existing residential neighborhood to the southeast of the site, it's an established

01:21:36.720 --> 01:21:43.160
 neighborhood, large lot, however that neighborhood will not connect to that future Westgate slash

01:21:43.160 --> 01:21:52.360
 Bronco way to the north, so there won't be a direct vehicular connection to the subject

01:21:52.360 --> 01:21:57.200
 property, creating that physical separation between the subject site and that neighborhood,

01:21:57.200 --> 01:22:03.640
 so we anticipate no adverse impacts for that neighborhood with the proposal.

01:22:03.640 --> 01:22:09.320
 There's also the future Denton High School campus that's located south of that future

01:22:09.320 --> 01:22:13.480
 Bronco way, which is kind of that Westgate piece now.

01:22:13.480 --> 01:22:18.000
 Commercial land uses are generally compatible with high school campuses, you often see both

01:22:18.000 --> 01:22:22.880
 of those things on arterial roadways and we do not anticipate any adverse impacts and

01:22:22.880 --> 01:22:27.720
 then finally there is a new residential subdivision north of the future Bronco way.

01:22:27.720 --> 01:22:32.280
 There is once again a physical separation, there's a vacant piece of property between

01:22:32.280 --> 01:22:38.440
 the subject site and that future residential neighborhood and we do not anticipate adverse

01:22:38.440 --> 01:22:40.720
 impacts.

01:22:40.720 --> 01:22:45.160
 The third criterion for approval is adequate safe circulation of vehicular traffic.

01:22:45.160 --> 01:22:51.600
 So onsite, the access will remain unchanged as well as that existing circulation pattern.

01:22:51.600 --> 01:22:58.040
 The onsite parking spaces will go down, but they still will maintain an overall ratio

01:22:58.040 --> 01:23:02.380
 that is consistent with what we typically see for similar developments under the current

01:23:02.380 --> 01:23:03.920
 code.

01:23:03.920 --> 01:23:10.120
 And then offsite, there is a surrounding arterial network, not only two highways, but also a

01:23:10.120 --> 01:23:17.520
 secondary arterial and that future Westgate/Bronco way and then the highway 377 as well as Bonnie

01:23:17.520 --> 01:23:18.520
 Braze.

01:23:18.520 --> 01:23:24.160
 So there's a lot of connectivity in the area and so there is adequate access for the existing

01:23:24.160 --> 01:23:26.800
 and future development.

01:23:26.800 --> 01:23:31.860
 Finally the fourth criterion is substantial compliance with the landscape sign subdivision

01:23:31.860 --> 01:23:39.600
 and other regulations of the city.

01:23:39.600 --> 01:23:44.600
 The proposal follows the 1988 landscape code, which is a little different than what we have

01:23:44.600 --> 01:23:45.600
 today.

01:23:45.600 --> 01:23:47.920
 There were three essential elements.

01:23:47.920 --> 01:23:51.720
 First of all, street yard landscaping, parking lot landscaping, and then finally parking

01:23:51.720 --> 01:23:52.920
 lot screening.

01:23:52.920 --> 01:23:57.520
 The street yard is something we don't often talk about under current regulations, but

01:23:57.520 --> 01:24:03.000
 it was that area between the front building line of the buildings and the right-of-way.

01:24:03.000 --> 01:24:09.080
 The subject request has about 40,000 square feet within its street yard, which required

01:24:09.080 --> 01:24:11.520
 a minimum of 20% landscaping.

01:24:11.520 --> 01:24:17.880
 The applicant is proposing about 17,000 square feet of landscaping, well above the required

01:24:17.880 --> 01:24:20.080
 8,000 square feet of landscaping.

01:24:20.080 --> 01:24:25.260
 They're also proposing 16 trees, which is consistent with the requirement of one tree

01:24:25.260 --> 01:24:29.440
 per 2,500 square feet of total street yard.

01:24:29.440 --> 01:24:36.840
 Parking lot landscaping, the parking lot areas in the street yard have to provide 5% of landscaping

01:24:36.840 --> 01:24:40.520
 with landscape islands, peninsulas, medians, that sort of thing.

01:24:40.520 --> 01:24:45.960
 The applicant is proposing 2,900 square feet of parking lot landscaping.

01:24:45.960 --> 01:24:51.600
 And then parking lot screening, parking lots had to be screened with either a berm, a masonry

01:24:51.600 --> 01:24:53.480
 wall, or an evergreen hedge.

01:24:53.480 --> 01:24:58.600
 There is an existing evergreen hedge, and they will replace that with 54 dwarf Buford

01:24:58.600 --> 01:25:07.480
 holly shrubs, which is consistent with the existing plant pallet and landscape design.

01:25:07.480 --> 01:25:10.240
 Public outreach was done in accordance with the code.

01:25:10.240 --> 01:25:15.760
 The newspaper website and assigned posting, mailed notices were sent to property owners

01:25:15.760 --> 01:25:19.800
 within 200 feet, and courtesy notices within 500 feet.

01:25:19.800 --> 01:25:24.480
 We have not received any responses either in opposition or in favor to the request,

01:25:24.480 --> 01:25:28.120
 and they did not hold a public meeting.

01:25:28.120 --> 01:25:33.400
 Staff recommends approval of the detail plan amendment because it is consistent with the

01:25:33.400 --> 01:25:35.680
 criteria for approval in the 91 code.

01:25:35.680 --> 01:25:41.400
 The site plan and landscape plan and sample building elevations will be attached to the

01:25:41.400 --> 01:25:44.880
 ordinance.

01:25:44.880 --> 01:25:52.440
 And they do enumerate the following, one single story 30,000 square foot building would be

01:25:52.440 --> 01:25:56.160
 constructed in addition to those existing four buildings.

01:25:56.160 --> 01:26:01.120
 The maximum parking on site could be 828 spaces.

01:26:01.120 --> 01:26:07.540
 They are proposing 10 large canopy and 6 medium canopy trees, and just to alert you,

01:26:07.540 --> 01:26:11.200
 that is different than the staff report.

01:26:11.200 --> 01:26:17.120
 There was an error on that staff report, so it's the 10 large canopy and 6 medium canopy.

01:26:17.120 --> 01:26:22.560
 And then the architecture for all the buildings need to maintain the consistent themes with

01:26:22.560 --> 01:26:28.880
 the following elements, the colonnade for 50% of the façade, the varied roof parapet

01:26:28.880 --> 01:26:34.960
 for 50% of the façade facing the public areas, and then those at least two decorative towers

01:26:34.960 --> 01:26:40.120
 that have to be at least five feet taller than the surrounding roof line.

01:26:40.120 --> 01:26:47.720
 I'll be available for questions, and I believe the applicant, we're going to try to get them

01:26:47.720 --> 01:26:51.520
 called in as well.

01:26:51.520 --> 01:26:52.520
 >> Thank you so much, Julie.

01:26:52.520 --> 01:26:55.840
 It looks like we have Krister back as a question.

01:26:55.840 --> 01:27:03.040
 Julie, I think you mentioned this, but who owns the property with a vacant lot to the

01:27:03.040 --> 01:27:04.040
 east?

01:27:04.040 --> 01:27:09.080
 >> No, I don't know who the property owner is of that vacant lot to the east.

01:27:09.080 --> 01:27:11.160
 >> Is it a different owner?

01:27:11.160 --> 01:27:13.040
 >> I suspect it is a different owner.

01:27:13.040 --> 01:27:16.880
 Let me see if I can look that up really quickly, though.

01:27:16.880 --> 01:27:17.880
 I'm going to try.

01:27:17.880 --> 01:27:23.520
 >> And I'll say the reason I asked that question is one of the rationales for the development

01:27:23.520 --> 01:27:30.000
 was we don't expect a lot of change, but then the chair also brought up that there's lots

01:27:30.000 --> 01:27:39.400
 of 30-year-old code going into this property and vicinity, and it would be at least informative

01:27:39.400 --> 01:27:47.200
 to know maybe how that vacant lot is, maybe what intentions are for it, at least at the

01:27:47.200 --> 01:27:48.200
 moment.

01:27:48.200 --> 01:27:57.000
 So I do show that as a different owner, just to alert you that it is within a plan development.

01:27:57.000 --> 01:28:02.600
 So prior to development of that site, it would have to go through this whole process.

01:28:02.600 --> 01:28:08.240
 So it would require a detailed plan amendment and the criteria for approval with that.

01:28:08.240 --> 01:28:15.400
 And one of those, as we talked about tonight, is that adverse impacts to adjacent property.

01:28:15.400 --> 01:28:22.920
 So it will still require this additional scrutiny and review by the planning and zoning commission,

01:28:22.920 --> 01:28:25.920
 a recommendation, and then approval by council.

01:28:25.920 --> 01:28:33.760
 So I don't know of any applications that are pending right now or any proposals, but it

01:28:33.760 --> 01:28:37.120
 would have to -- it would have to go before you, before you could -- before it would be

01:28:37.120 --> 01:28:38.120
 developed.

01:28:38.120 --> 01:28:39.120
 >> Okay.

01:28:39.120 --> 01:28:40.120
 Thank you very much.

01:28:40.120 --> 01:28:42.120
 >> You bet.

01:28:42.120 --> 01:28:45.800
 And just to reiterate, I'm not sure if I mentioned it before, I wanted to make sure the public

01:28:45.800 --> 01:28:47.520
 hearing is open.

01:28:47.520 --> 01:28:48.520
 This is a public hearing.

01:28:48.520 --> 01:28:54.800
 So we certainly invite anyone to speak on this item or have any questions, we'll certainly

01:28:54.800 --> 01:28:55.800
 hear those.

01:28:55.800 --> 01:28:58.600
 Does the applicant have a presentation?

01:28:58.600 --> 01:28:59.600
 Commissioner Anderson.

01:28:59.600 --> 01:29:00.600
 >> Sure.

01:29:00.600 --> 01:29:03.920
 I have a quick question for the staff.

01:29:03.920 --> 01:29:06.800
 Is this going to -- I mean, they're going to build that building, is they going to take

01:29:06.800 --> 01:29:10.520
 away parking for the existing -- like the horny toad cafe, is it going to have an adverse

01:29:10.520 --> 01:29:15.120
 impact on their business, because I know they have customers that park there presently?

01:29:15.120 --> 01:29:16.120
 >> Sure.

01:29:16.120 --> 01:29:22.360
 There is -- so the adjacent commercial restaurant use has its own parking on site.

01:29:22.360 --> 01:29:29.320
 This would reduce parking, but it is -- you know, under current DDC standards, something

01:29:29.320 --> 01:29:36.240
 like this office use would -- we would only require one space per 450 square feet, and

01:29:36.240 --> 01:29:39.760
 they're actually parked at one space per 206 square feet.

01:29:39.760 --> 01:29:49.840
 So it's got ample parking, which is over what we would require, and under today's standards.

01:29:49.840 --> 01:29:53.440
 So I believe there's sufficient parking on site.

01:29:53.440 --> 01:29:54.440
 >> Okay.

01:29:54.440 --> 01:29:58.800
 I would just hate to -- you know, hurt another existing business that's out there by themselves

01:29:58.800 --> 01:30:06.640
 right now, and, you know, surviving alone presently, so.

01:30:06.640 --> 01:30:09.840
 Does the applicant have a presentation or this here for questions, it looks like I might

01:30:09.840 --> 01:30:13.540
 have seen their name pop up at the top.

01:30:13.540 --> 01:30:14.540
 >> She does have a --

01:30:14.540 --> 01:30:15.540
 >> We are here.

01:30:15.540 --> 01:30:16.540
 >> Perfect.

01:30:16.540 --> 01:30:20.960
 If you -- it looks like Alex and Amy, but if you could state your full name and address,

01:30:20.960 --> 01:30:24.960
 and then we'll be happy to listen to your presentation.

01:30:24.960 --> 01:30:26.160
 >> Great.

01:30:26.160 --> 01:30:27.160
 This is Alex Payne.

01:30:27.160 --> 01:30:31.200
 I'm at 2304 Cavendish Lane, Argyle, Texas.

01:30:31.200 --> 01:30:38.520
 I am one of the property owners and our company manages and leases the facility.

01:30:38.520 --> 01:30:47.320
 I have a kind of a -- I guess brief -- a brief statement in that -- to Mr. Anderson's question

01:30:47.320 --> 01:30:50.980
 in that the Horny Toad Cafe purchased their lot.

01:30:50.980 --> 01:30:58.280
 It does have a huge parking lot to the east of it, and I think they'll welcome the arrival

01:30:58.280 --> 01:31:09.840
 of 200 new employees and a number of visitors daily to that location, so.

01:31:09.840 --> 01:31:15.400
 The property itself has been in current ownership for about four years, and we have been in

01:31:15.400 --> 01:31:21.200
 the process of trying to, you know, work with the existing tenants that have been there

01:31:21.200 --> 01:31:26.840
 for many years to keep the property well maintained, but then reposition a lot of the vacancy.

01:31:26.840 --> 01:31:31.360
 It was 30% occupied when we took over.

01:31:31.360 --> 01:31:36.880
 It's sitting around 90% today before the construction of this proposed building.

01:31:36.880 --> 01:31:43.280
 So a lot of the tenants that we have put in, some are retail-type tenants.

01:31:43.280 --> 01:31:51.760
 Several though have been kind of your back office, call centers, we've got a dental management

01:31:51.760 --> 01:31:56.720
 group that owns a bunch of dental clinics, and they have 25,000 feet there.

01:31:56.720 --> 01:32:00.920
 We have the Census Bureau is currently officeing there.

01:32:00.920 --> 01:32:05.920
 University of Behavioral Health has an administrative office there, and like I said, this is a new

01:32:05.920 --> 01:32:08.440
 proposed government office center.

01:32:08.440 --> 01:32:14.120
 So I'll read kind of a statement from Workforce Solutions, and I know it and refer to it as

01:32:14.120 --> 01:32:19.520
 Texas Workforce Commission, but the Workforce Solutions for North Texas, they provide a

01:32:19.520 --> 01:32:24.760
 variety of services to employers and career seekers through a network of workforce centers

01:32:24.760 --> 01:32:29.080
 in the North Central Texas, 14-county area.

01:32:29.080 --> 01:32:34.360
 So they provide services to employers offering assistance related to job postings and openings,

01:32:34.360 --> 01:32:38.800
 recruitment efforts, and connecting the employers to career seekers looking for employment.

01:32:38.800 --> 01:32:44.560
 They also provide services to career-seeking customers offering career coaching, employment

01:32:44.560 --> 01:32:49.620
 preparation, educational and skills training, as well as tuition support and other services

01:32:49.620 --> 01:32:53.200
 to support the efforts in finding employment.

01:32:53.200 --> 01:33:00.680
 In addition to those functions, they have a partner agency that provides vocational rehabilitation,

01:33:00.680 --> 01:33:07.120
 which prepares for, finds, and retains employment if you have a disability through their partnership.

01:33:07.120 --> 01:33:14.040
 And so we're excited to have them, and you know, we started working on this project before

01:33:14.040 --> 01:33:21.280
 the current economic environment we're in, but this has, you know, really amplified the

01:33:21.280 --> 01:33:28.780
 need for their growth and expansion of their services and size of their facility.

01:33:28.780 --> 01:33:34.400
 As I think I mentioned already, they expect approximately 200 employees in this facility

01:33:34.400 --> 01:33:40.760
 of their agency, and then they look to place, you know, people in our county into jobs in

01:33:40.760 --> 01:33:41.760
 the area.

01:33:41.760 --> 01:33:47.280
 So, you know, I'll answer more questions later if need be.

01:33:47.280 --> 01:33:52.160
 Amy Bissett also has some more information on our proposed development.

01:33:52.160 --> 01:33:53.800
 I'll let her speak now.

01:33:53.800 --> 01:33:55.560
 Good evening, commissioners.

01:33:55.560 --> 01:34:02.880
 This is Amy Bissett, 1117 Joshua Tree in Salina.

01:34:02.880 --> 01:34:04.920
 Can you all hear me?

01:34:04.920 --> 01:34:05.920
 Yes.

01:34:05.920 --> 01:34:09.260
 Okay, great.

01:34:09.260 --> 01:34:14.620
 I want to start by addressing a couple of questions that were brought up in the work

01:34:14.620 --> 01:34:19.480
 session to just to make sure those are covered.

01:34:19.480 --> 01:34:25.240
 Commissioner Ellis, you specifically asked about the notices that went out to neighbors

01:34:25.240 --> 01:34:28.880
 and whether or not we received any responses.

01:34:28.880 --> 01:34:36.360
 I do want to share with the commission that I got a call from Judy Smith with Rose Costumes.

01:34:36.360 --> 01:34:41.640
 She was just interested in knowing what the proposed use was and what we were going to

01:34:41.640 --> 01:34:46.720
 do in terms of building architecture, and so I sent her the site plan and the renderings

01:34:46.720 --> 01:34:49.160
 and answered her questions.

01:34:49.160 --> 01:34:51.760
 Apparently, she was satisfied with that.

01:34:51.760 --> 01:34:57.800
 I think she's excited to see more, just more tenants and more density in that area.

01:34:57.800 --> 01:35:03.680
 And I think that speaks to Commissioner Anderson's question as well about parking for the restaurant

01:35:03.680 --> 01:35:04.680
 to the north.

01:35:04.680 --> 01:35:12.800
 I think the density of employees up in that area will hopefully be a boost to their restaurant

01:35:12.800 --> 01:35:13.800
 business.

01:35:13.800 --> 01:35:17.960
 Julie, will you go ahead and go to the first slide, please?

01:35:17.960 --> 01:35:24.080
 I have a couple of slides that will be very quick.

01:35:24.080 --> 01:35:30.800
 I want to start by saying that, just to give you an idea, Alex already went over this,

01:35:30.800 --> 01:35:35.440
 but this is just under 20 acres with a PD that was approved in the early '90s.

01:35:35.440 --> 01:35:43.480
 There are four existing buildings with a number of tenants, as you can see in the slide presentation,

01:35:43.480 --> 01:35:45.800
 if you're able to see that.

01:35:45.800 --> 01:35:52.280
 This includes Rose Costumes and Explorium Denton, the Children's Museum, and some antique

01:35:52.280 --> 01:35:53.280
 and retail shops.

01:35:53.280 --> 01:35:59.040
 And there's, Julie, if you can advance now to slides three and four, I just want to show

01:35:59.040 --> 01:36:08.160
 you all the aerial of what the project looks like today and some of the architecture that

01:36:08.160 --> 01:36:09.160
 is there today.

01:36:09.160 --> 01:36:14.840
 What we are proposing basically is consistent with the original PD.

01:36:14.840 --> 01:36:20.760
 The change here is that the building is slightly smaller than what the original PD approved.

01:36:20.760 --> 01:36:25.880
 But generally speaking, if you'll go to slide five, Julie, we're looking at a net increase

01:36:25.880 --> 01:36:30.880
 of almost 3,000 square feet in landscaping and a net increase of 10 trees.

01:36:30.880 --> 01:36:38.620
 We'll be planting 16 new trees, but there's some on the site that we'll be able to keep

01:36:38.620 --> 01:36:44.000
 there as well, but some will have to come down to accommodate the building.

01:36:44.000 --> 01:36:50.120
 And then finally, Julie has already shared the renderings with you on slides six and

01:36:50.120 --> 01:36:51.120
 seven.

01:36:51.120 --> 01:36:56.560
 So that's the summary of what we're looking for, and I'll be glad to answer any questions.

01:36:56.560 --> 01:37:00.980
 And Alex is here as well to answer any questions.

01:37:00.980 --> 01:37:01.980
 Thank you, Amy.

01:37:01.980 --> 01:37:02.980
 Thank you, Alex.

01:37:02.980 --> 01:37:03.980
 Does anyone have any questions?

01:37:03.980 --> 01:37:09.720
 I don't see any hands raised right now, so I think we're good.

01:37:09.720 --> 01:37:13.720
 I appreciate you calling in and working with us virtually to present to us.

01:37:13.720 --> 01:37:14.720
 Thank you.

01:37:14.720 --> 01:37:15.720
 Absolutely.

01:37:15.720 --> 01:37:19.920
 We're glad to do it.

01:37:19.920 --> 01:37:23.920
 Is there any looking at city, any call ins for comments?

01:37:23.920 --> 01:37:25.880
 I don't see any.

01:37:25.880 --> 01:37:29.160
 And so with that, I will close the public hearing.

01:37:29.160 --> 01:37:33.120
 And it looks like Commissioner Smith was the first one I saw there.

01:37:33.120 --> 01:37:35.920
 Make a motion to approve.

01:37:35.920 --> 01:37:37.280
 We have a first for approval.

01:37:37.280 --> 01:37:38.280
 And Commissioner Ellis?

01:37:38.280 --> 01:37:39.280
 Second.

01:37:39.280 --> 01:37:42.400
 We have a first and a second for approval.

01:37:42.400 --> 01:37:47.280
 Is there any discussion on this item?

01:37:47.280 --> 01:37:50.280
 Seeing none, I'll call for a vote via roll call.

01:37:50.280 --> 01:37:51.640
 Commissioner Ellis?

01:37:51.640 --> 01:37:52.640
 Aye.

01:37:52.640 --> 01:37:54.400
 Commissioner Smith?

01:37:54.400 --> 01:37:55.400
 Aye.

01:37:55.400 --> 01:37:56.960
 Commissioner Cole?

01:37:56.960 --> 01:37:57.960
 Aye.

01:37:57.960 --> 01:37:59.440
 Commissioner Anderson?

01:37:59.440 --> 01:38:00.440
 Aye.

01:38:00.440 --> 01:38:01.880
 Commissioner Pernetta?

01:38:01.880 --> 01:38:02.880
 Aye.

01:38:02.880 --> 01:38:04.200
 Commissioner Beck?

01:38:04.200 --> 01:38:05.200
 Aye.

01:38:05.200 --> 01:38:07.160
 And the chair votes in favor.

01:38:07.160 --> 01:38:10.560
 That means it carries seven, zero.

01:38:10.560 --> 01:38:17.160
 Next item of business is item 4C, S19-0015D.

01:38:17.160 --> 01:38:33.320
 I will open the public hearing and invite Cindy Jackson for presentation.

01:38:33.320 --> 01:39:00.880
 Okay, so I'll put this up for your hearing.

01:39:00.880 --> 01:39:20.800
 I don't see it here.

01:39:20.800 --> 01:39:29.440
 Damn, it's down here.

01:39:29.440 --> 01:39:31.440
 Okay.

01:39:31.440 --> 01:39:33.440
 Okay.

01:39:33.440 --> 01:40:00.440
 Okay.

01:40:00.440 --> 01:40:28.960
 I don't think it's my revised one.

01:40:28.960 --> 01:40:54.480
 It will be just a minute.

01:40:54.480 --> 01:41:02.480
 Perfect.

01:41:02.480 --> 01:41:13.480
 Here.

01:41:13.480 --> 01:41:24.400
 Okay.

01:41:24.400 --> 01:41:25.400
 Sorry about that.

01:41:25.400 --> 01:41:27.460
 We lost the presentation.

01:41:27.460 --> 01:41:28.460
 Okay.

01:41:28.460 --> 01:41:34.880
 For the record, this is Cindy Jackson with the planning and development, the planning

01:41:34.880 --> 01:41:36.920
 division.

01:41:36.920 --> 01:41:44.320
 S19-0015 is a request for approval of a specific use permit to permit communications tower

01:41:44.320 --> 01:41:53.120
 with a maximum height of 810 feet mean sea level for broadband wireless service.

01:41:53.120 --> 01:41:56.280
 The request was originally for 150 foot tower.

01:41:56.280 --> 01:42:01.480
 However, it's been determined that the subject site is actually located within the airport

01:42:01.480 --> 01:42:03.760
 height hazard district.

01:42:03.760 --> 01:42:10.480
 The height of structures located in this area, the maximum height permitted is 810 feet mean

01:42:10.480 --> 01:42:19.000
 sea level per section 4.5.8C3, which translates to 82 feet as a maximum permitted height for

01:42:19.000 --> 01:42:24.140
 the tower.

01:42:24.140 --> 01:42:33.640
 The site is zoned mixed use regional MR.

01:42:33.640 --> 01:42:39.960
 The proposed tower and accompanying office is located on 4.37 acre lot.

01:42:39.960 --> 01:42:46.680
 However, the lot is encumbered by 140 foot wide drainage easement on the west side.

01:42:46.680 --> 01:42:52.460
 With this map, particularly the north, is to the right.

01:42:52.460 --> 01:42:58.760
 This shows you the impact area, which is 1.05 acres, and the proposed tower location in

01:42:58.760 --> 01:43:05.680
 relation to the entire site.

01:43:05.680 --> 01:43:10.880
 This is a close up of the proposed development site plan, the impact area.

01:43:10.880 --> 01:43:15.080
 You can see that the site will take access on Barcelona Street, and it has a shared access

01:43:15.080 --> 01:43:20.720
 with the property that's located to the west, and this tower is proposed to be located right

01:43:20.720 --> 01:43:27.800
 here.

01:43:27.800 --> 01:43:36.800
 The proposed landscape plan has providing 40% landscape area, which is 15% above the

01:43:36.800 --> 01:43:39.500
 required 25%.

01:43:39.500 --> 01:43:46.360
 Six street trees are proposed along Barcelona Street along with a hedge, and the site meets

01:43:46.360 --> 01:43:53.960
 the required 30% tree canopy coverage.

01:43:53.960 --> 01:43:57.800
 Here you see the building elevations that are proposed, and the elevation that is on

01:43:57.800 --> 01:44:06.300
 the top here is the elevation proposed that will face Barcelona Street.

01:44:06.300 --> 01:44:10.480
 This is a photo of a tower similar to the one that is proposed.

01:44:10.480 --> 01:44:19.480
 The only difference would be that rather than the chain link, we will have a wooden fence

01:44:19.480 --> 01:44:25.520
 around the bottom of the structure.

01:44:25.520 --> 01:44:30.620
 General criteria for approval is in section 2.4.5E.

01:44:30.620 --> 01:44:36.520
 This site complies with all criteria for approval as noted in the staff report.

01:44:36.520 --> 01:44:45.440
 The SUP criteria for approval in section 2.5.3D I will go into in more detail.

01:44:45.440 --> 01:44:48.600
 Criteria one, compatibility with the surrounding area.

01:44:48.600 --> 01:44:52.080
 The surrounding development is comprised of light manufacturing companies, warehouses

01:44:52.080 --> 01:44:56.440
 and a medical clinic, which are primarily industrial in nature.

01:44:56.440 --> 01:45:03.480
 The proposed use of the site is compatible with the surrounding uses.

01:45:03.480 --> 01:45:08.000
 Criteria two, minimal impacts on future development.

01:45:08.000 --> 01:45:10.560
 The land surrounding the site is already developed.

01:45:10.560 --> 01:45:16.000
 The proposed communications tower and accompanying office building will have minimal impact on

01:45:16.000 --> 01:45:21.560
 the future development in the area.

01:45:21.560 --> 01:45:27.020
 Criteria three, proposed use conforms with all other standards of the DDC and all other

01:45:27.020 --> 01:45:29.300
 applicable city codes.

01:45:29.300 --> 01:45:34.420
 The proposed communications tower and accompanying office building meet all the applicable requirements

01:45:34.420 --> 01:45:38.040
 in the DDC and other city codes.

01:45:38.040 --> 01:45:42.920
 Criteria four, impacts associated with access traffic, emergency services, utilities, parking

01:45:42.920 --> 01:45:47.600
 refuge areas, glare and odor have been adequately mitigated.

01:45:47.600 --> 01:45:53.040
 The proposed communications tower is located on the interior of the platted lot outside

01:45:53.040 --> 01:45:56.320
 of any building setbacks, easements and right of way.

01:45:56.320 --> 01:45:59.680
 The utilities are already in place.

01:45:59.680 --> 01:46:09.720
 There is adequate transportation infrastructure that will be minimal if any glare, noise or

01:46:09.720 --> 01:46:10.720
 odor from the tower.

01:46:10.720 --> 01:46:17.200
 It will have minimal impacts.

01:46:17.200 --> 01:46:22.440
 Criteria five, the use is in conformance with the comprehensive plan and other adopted applicable

01:46:22.440 --> 01:46:24.020
 plans.

01:46:24.020 --> 01:46:28.800
 There is no other adopted plan for this site other than the comprehensive plan.

01:46:28.800 --> 01:46:33.360
 The site is designated business innovation on the future land use map.

01:46:33.360 --> 01:46:39.320
 Typical uses in this area include offices, light manufacturing and research and development.

01:46:39.320 --> 01:46:45.040
 The proposed use is for a broadband company's office and communication tower and it conforms

01:46:45.040 --> 01:46:50.560
 with this designation.

01:46:50.560 --> 01:46:55.640
 Criteria six, the use adversely impacts the health, safety and welfare of the inhabitants

01:46:55.640 --> 01:46:58.760
 of the area and the city of Denton.

01:46:58.760 --> 01:47:03.160
 The use will not adversely affect the health, safety and welfare of the inhabitants of the

01:47:03.160 --> 01:47:11.480
 city of Denton.

01:47:11.480 --> 01:47:20.520
 We sent out notification within 200 feet, a newspaper ad was posted and a sign was posted

01:47:20.520 --> 01:47:21.800
 on the site.

01:47:21.800 --> 01:47:27.960
 We have received two responses in opposition to this request.

01:47:27.960 --> 01:47:32.200
 They are located on the other side of the railroad track here.

01:47:32.200 --> 01:47:36.400
 And they represent 11% of the area within the 20 foot buffer.

01:47:36.400 --> 01:47:41.560
 We did receive one notice in favor which was from the property owner, however, that was

01:47:41.560 --> 01:47:46.400
 not counted.

01:47:46.400 --> 01:47:50.280
 Staff recommends approval of this request for a communications tower with a maximum

01:47:50.280 --> 01:47:59.400
 height of 810 feet mean sea level as it conforms with the criteria in section 2.4.5e.

01:47:59.400 --> 01:48:08.160
 The criteria in section 2.5.3d for approval of a specific use permit and section 4.5.8

01:48:08.160 --> 01:48:10.640
 of the air height hazard district.

01:48:10.640 --> 01:48:14.040
 And that concludes my presentation.

01:48:14.040 --> 01:48:17.800
 I believe the applicant has called in to answer any questions.

01:48:17.800 --> 01:48:18.800
 Great.

01:48:18.800 --> 01:48:22.040
 Thank you so much for your presentation, Cindy.

01:48:22.040 --> 01:48:23.040
 Commissioner Beck.

01:48:23.040 --> 01:48:24.040
 Yes.

01:48:24.040 --> 01:48:25.120
 Thank you, chair.

01:48:25.120 --> 01:48:32.200
 Can the applicant say whether there will be any changes in range from having the height

01:48:32.200 --> 01:48:34.720
 of the tower?

01:48:34.720 --> 01:48:36.720
 In terms of service range?

01:48:36.720 --> 01:48:42.560
 How do we get the applicant?

01:48:42.560 --> 01:48:43.560
 DTV?

01:48:43.560 --> 01:48:56.920
 If we want to have the applicant, I don't know if Mark or John, if you want to handle

01:48:56.920 --> 01:49:01.920
 that question?

01:49:01.920 --> 01:49:06.160
 Thank you.

01:49:06.160 --> 01:49:08.480
 This is Mark Martin, 100 West Oak Street.

01:49:08.480 --> 01:49:09.480
 Can you hear me?

01:49:09.480 --> 01:49:10.480
 Yes, sir.

01:49:10.480 --> 01:49:11.480
 Okay.

01:49:11.480 --> 01:49:12.480
 Excellent.

01:49:12.480 --> 01:49:22.200
 To answer Mr. Beck's question, yes, the height does make a difference, so the taller that

01:49:22.200 --> 01:49:28.440
 we can get the tower, obviously, the better, but as Cindy had mentioned, we are somewhat

01:49:28.440 --> 01:49:35.600
 limited by the airport restrictions at this point, at least.

01:49:35.600 --> 01:49:41.440
 I don't know if John's on the line, but if he needs to add something to that, please

01:49:41.440 --> 01:49:42.440
 go ahead.

01:49:42.440 --> 01:49:48.280
 Hello, this is John Hall, can you hear me?

01:49:48.280 --> 01:49:49.280
 We can, John.

01:49:49.280 --> 01:49:50.280
 Yes, John.

01:49:50.280 --> 01:49:51.280
 Oh, good.

01:49:51.280 --> 01:49:52.280
 There we go.

01:49:52.280 --> 01:49:53.280
 Okay.

01:49:53.280 --> 01:49:54.280
 Yeah, Mark is correct.

01:49:54.280 --> 01:49:59.640
 Obviously, the taller the tower, the better for us, and for all other providers that would

01:49:59.640 --> 01:50:04.280
 have access to that tower as well, we've leased out space to 18T of horizon.

01:50:04.280 --> 01:50:11.420
 However, with the current restriction, we're facing a deadline to get this project going

01:50:11.420 --> 01:50:16.680
 so we're willing to press forward at this point in time to get our SEP and get our building

01:50:16.680 --> 01:50:25.040
 permit and get shovels to the ground and start this project.

01:50:25.040 --> 01:50:26.040
 Okay, thank you.

01:50:26.040 --> 01:50:36.400
 Is there any other questions for Cindy or the applicant?

01:50:36.400 --> 01:50:39.840
 I don't see any at this time, Mark and John, I appreciate you being here.

01:50:39.840 --> 01:50:43.960
 Cindy, do I need to get them to state their address or did we get that when they called

01:50:43.960 --> 01:50:44.960
 in?

01:50:44.960 --> 01:50:45.960
 Do we have that information?

01:50:45.960 --> 01:50:48.280
 Yes, I do need to state their address.

01:50:48.280 --> 01:50:54.720
 Yeah, John, can you just state your name again and your address as well as Mark?

01:50:54.720 --> 01:50:56.280
 Yeah, correct.

01:50:56.280 --> 01:51:03.440
 John Hall, 1310 Chimney Rock Drive, Keller, Texas.

01:51:03.440 --> 01:51:08.720
 And Mark Martin, 100 West Oak Street, Suite 201, Denton, Texas.

01:51:08.720 --> 01:51:10.460
 I appreciate that for both of you.

01:51:10.460 --> 01:51:12.080
 Is there any public comments coming in?

01:51:12.080 --> 01:51:15.800
 I don't see anyone from the public wanting to speak on this item.

01:51:15.800 --> 01:51:19.040
 With that, I will close the public hearing and turn to motion or discussion.

01:51:19.040 --> 01:51:20.040
 Commissioner Anderson.

01:51:20.040 --> 01:51:21.040
 I make a motion to approve.

01:51:21.040 --> 01:51:23.080
 We have a first for approval.

01:51:23.080 --> 01:51:24.080
 Commissioner Pernetta?

01:51:24.080 --> 01:51:25.080
 Second.

01:51:25.080 --> 01:51:27.480
 We have a first and a second for approval.

01:51:27.480 --> 01:51:30.840
 Is there any discussion on this item?

01:51:30.840 --> 01:51:33.800
 Seeing none, I'll call a vote via roll call.

01:51:33.800 --> 01:51:34.800
 Commissioner Ellis?

01:51:34.800 --> 01:51:35.800
 Aye.

01:51:35.800 --> 01:51:36.800
 Commissioner Smith?

01:51:36.800 --> 01:51:37.800
 Aye.

01:51:37.800 --> 01:51:38.800
 Commissioner Colle?

01:51:38.800 --> 01:51:39.800
 Aye.

01:51:39.800 --> 01:51:40.800
 Commissioner Anderson?

01:51:40.800 --> 01:51:41.800
 Aye.

01:51:41.800 --> 01:51:42.800
 Commissioner Bek?

01:51:42.800 --> 01:51:43.800
 Aye.

01:51:43.800 --> 01:51:44.800
 Commissioner Pernetta?

01:51:44.800 --> 01:51:45.800
 Aye.

01:51:45.800 --> 01:51:48.880
 The chair is an aye.

01:51:48.880 --> 01:51:52.400
 Motion carries 7-0.

01:51:52.400 --> 01:51:58.760
 Next item of business is item 4D, PD 20-0001.

01:51:58.760 --> 01:52:16.280
 I'll invite Haley Zagurski for presentation and open the public hearing.

01:52:16.280 --> 01:52:30.280
 Good evening.

01:52:30.280 --> 01:52:37.240
 This is case PD 20-0001 for Sagebrook.

01:52:37.240 --> 01:52:39.920
 The request before you is twofold.

01:52:39.920 --> 01:52:47.760
 It is an initial zoning request for plan development district on approximately 132 acres.

01:52:47.760 --> 01:52:54.400
 It is a rezoning request from the residential 6 or R6 district to PD on the remaining 14

01:52:54.400 --> 01:52:55.400
 acres.

01:52:55.400 --> 01:52:58.000
 The site is a total of approximately 146 acres.

01:52:58.000 --> 01:53:00.080
 It's outlined in yellow on the map.

01:53:00.080 --> 01:53:06.600
 It has frontage on Allred Road on the north, Bonnie Bray to the east, and is located along

01:53:06.600 --> 01:53:11.660
 the railroad tracks parallel to Fort Worth Drive on the east side as well.

01:53:11.660 --> 01:53:16.960
 This is a look at the current zoning map that shows the R6 district along the railroad frontage

01:53:16.960 --> 01:53:18.360
 there along Fort Worth Drive.

01:53:18.360 --> 01:53:23.920
 That was part of a strip annexation down the highway in the 1960s.

01:53:23.920 --> 01:53:28.460
 The balance of the property is shown as RR, which is our rural residential district.

01:53:28.460 --> 01:53:32.760
 After a property is annexed, it receives that placeholder designation until it is initially

01:53:32.760 --> 01:53:33.760
 zoned.

01:53:33.760 --> 01:53:39.960
 This property completed the annexation process in March of this year.

01:53:39.960 --> 01:53:43.960
 This is a look at the site layout exhibit that's included as part of the PD.

01:53:43.960 --> 01:53:47.120
 It shows 491 residential lots.

01:53:47.120 --> 01:53:53.520
 There are approximately 9.4 acres of dedicated HOA open space that includes the amenity center

01:53:53.520 --> 01:53:56.080
 on the south side that's circled in yellow.

01:53:56.080 --> 01:54:01.160
 That area also includes a pond and walking trails as well as some play features.

01:54:01.160 --> 01:54:05.240
 And then the other site circled in yellow on the northeast corner of the property is

01:54:05.240 --> 01:54:11.160
 another larger HOA area that would feature a pond with trails and benches as well.

01:54:11.160 --> 01:54:15.720
 Outlined in blue is the kind of central north-south spine through the development.

01:54:15.720 --> 01:54:20.040
 That road is designed more like a boulevard with traffic divided to go one way in each

01:54:20.040 --> 01:54:23.360
 direction on either side of a central median.

01:54:23.360 --> 01:54:27.120
 That median will feature enhanced landscaping as well as a 10-foot wide combined hike bike

01:54:27.120 --> 01:54:33.080
 trail that will allow for pedestrian connectivity from Allred Road down to Brush Creek Road on

01:54:33.080 --> 01:54:34.720
 the south.

01:54:34.720 --> 01:54:38.760
 Brush Creek is a future primary arterial.

01:54:38.760 --> 01:54:44.240
 The right-of-way width for that would be dedicated and the developer would construct two lanes

01:54:44.240 --> 01:54:49.840
 of that road with each phase of their development adjacent to their property.

01:54:49.840 --> 01:54:53.520
 South of Brush Creek is an area that's approximately 18 acres total.

01:54:53.520 --> 01:54:57.600
 Fourteen of that is floodplain and ESA.

01:54:57.600 --> 01:55:00.960
 That area is proposed to be dedicated to the city for the development of future trails by

01:55:00.960 --> 01:55:03.240
 our Parks Department.

01:55:03.240 --> 01:55:06.880
 And then circled in red on the map is another feature I wanted to call out, which is the

01:55:06.880 --> 01:55:09.440
 location of a plugged gas well.

01:55:09.440 --> 01:55:13.120
 Up until the last year or so, there was an active gas well on this site and the developer

01:55:13.120 --> 01:55:16.040
 did plug that in anticipation of this development.

01:55:16.040 --> 01:55:21.600
 And it's shown in an open space so that nothing would be built over that well.

01:55:21.600 --> 01:55:25.680
 This plan is intended to show the phasing that's proposed for this development.

01:55:25.680 --> 01:55:31.520
 It's proposed as four phases, with phase one being the largest of those with 143 units

01:55:31.520 --> 01:55:33.440
 as well as the amenity center.

01:55:33.440 --> 01:55:39.680
 With phase one, the connection of Brush Creek to Fort Worth Drive would be established.

01:55:39.680 --> 01:55:43.680
 That includes the relocation of the railroad crossing that's currently at South Pawnee

01:55:43.680 --> 01:55:49.000
 Bray and Fort Worth Drive, which is at a very odd angle and fairly unsafe today with limited

01:55:49.000 --> 01:55:53.720
 stacking distance for cars turning off of 377.

01:55:53.720 --> 01:55:59.280
 That intersection would be closed and that crossing would be relocated and properly aligned

01:55:59.280 --> 01:56:00.280
 down at Brush Creek.

01:56:00.280 --> 01:56:04.000
 And they are coordinating that with the city and the railroad company so that that can

01:56:04.000 --> 01:56:05.640
 occur with phase one.

01:56:05.640 --> 01:56:09.800
 Phase one also includes that primary north-south boulevard so that there are two points of

01:56:09.800 --> 01:56:11.960
 connection for phase one.

01:56:11.960 --> 01:56:16.400
 Phase two would be to the north of that and have approximately 133 units.

01:56:16.400 --> 01:56:20.100
 Phase three would be on the west side and would continue the extension of Brush Creek

01:56:20.100 --> 01:56:23.440
 Road as well as 99 residential units.

01:56:23.440 --> 01:56:27.760
 And the north of that would be phase four, closing this out with another 116 units and

01:56:27.760 --> 01:56:33.660
 that final portion of Brush Creek that falls within this property.

01:56:33.660 --> 01:56:38.640
 This chart just shows a comparison of the proposed PD to the base zoning of R6 that

01:56:38.640 --> 01:56:40.600
 they've based this on.

01:56:40.600 --> 01:56:45.480
 This takes out many of the uses that are permitted in R6 and allows only single-family detached

01:56:45.480 --> 01:56:50.000
 dwellings, parks, playgrounds, open space, and amenity centers as well as the accessory

01:56:50.000 --> 01:56:55.560
 and temporary uses as they're permitted within R6.

01:56:55.560 --> 01:57:00.460
 This table then shows the comparison of the dimensional standards and some of the landscaping

01:57:00.460 --> 01:57:04.840
 standards between the PD and the R6 district.

01:57:04.840 --> 01:57:06.320
 Largely they are the same.

01:57:06.320 --> 01:57:10.520
 They are proposing an enhanced front yard with an additional 10 feet of depth for a

01:57:10.520 --> 01:57:12.640
 total of 20 feet.

01:57:12.640 --> 01:57:18.180
 I did want to note up until today the plans reflected a 10-foot side yard.

01:57:18.180 --> 01:57:22.760
 That was an error they intended for that 10-foot side yard to be only on the corner lots.

01:57:22.760 --> 01:57:27.760
 That was carried throughout and that is proposed to be amended to 5 feet to meet the R6 standard

01:57:27.760 --> 01:57:31.560
 on the interior lots.

01:57:31.560 --> 01:57:36.440
 The other primary enhancement from our DDC standards is with respect to landscaping.

01:57:36.440 --> 01:57:40.760
 The code only specifies one tree per yard for residential uses.

01:57:40.760 --> 01:57:45.700
 They would propose one tree per front yard, an additional two ornamental trees on each

01:57:45.700 --> 01:57:51.640
 corner lot, and then a standard of 12 shrubs and 10 other ornamental plants for interior

01:57:51.640 --> 01:57:57.880
 lots as well as evergreen screening along the foundations for those corner properties.

01:57:57.880 --> 01:58:00.440
 They do have an overall enhancement in open space.

01:58:00.440 --> 01:58:05.360
 The DDC requires a minimum of 5% of the area be open space.

01:58:05.360 --> 01:58:10.840
 For the entire development they are at 18%.

01:58:10.840 --> 01:58:14.520
 There are general criteria for approval that are applicable to all applications in the

01:58:14.520 --> 01:58:16.560
 DDC.

01:58:16.560 --> 01:58:19.560
 The plan does comply with all of these, so I won't go through them in detail, but they

01:58:19.560 --> 01:58:21.920
 are outlined in your backup.

01:58:21.920 --> 01:58:26.960
 And then I will go through each of these PD specific criteria for approval in turn.

01:58:26.960 --> 01:58:36.240
 Criteria 1 is compliance with the plan 2030, when looking at our future land use map, this

01:58:36.240 --> 01:58:43.000
 site has a...

01:58:43.000 --> 01:58:44.000
 We lost...

01:58:44.000 --> 01:58:45.000
 There we go.

01:58:45.000 --> 01:58:48.000
 Haley, are you back?

01:58:48.000 --> 01:58:49.000
 Okay, yes.

01:58:49.000 --> 01:58:50.800
 It shows I'm unmuted now.

01:58:50.800 --> 01:58:51.800
 Okay.

01:58:51.800 --> 01:58:52.800
 All right.

01:58:52.800 --> 01:58:57.200
 So this has the neighborhood mixed use designation on the east part of the property.

01:58:57.200 --> 01:59:02.400
 You can see on the map that area in the dark pink color is a node of neighborhood service

01:59:02.400 --> 01:59:07.560
 uses, commercial uses and moderate density residential that's expected where Bonnie Bray

01:59:07.560 --> 01:59:11.880
 and Brush Creek intersect with highway 377.

01:59:11.880 --> 01:59:15.400
 The balance of the property is designated as rural areas.

01:59:15.400 --> 01:59:20.000
 Most of the properties that are within the city's ETJ or donut holes are designated on

01:59:20.000 --> 01:59:21.600
 our map as rural areas.

01:59:21.600 --> 01:59:24.160
 This is consistent with that.

01:59:24.160 --> 01:59:28.320
 This area is highly transitional though, if you look at the broader...

01:59:28.320 --> 01:59:35.760
 The wedge of this pie between where 35 bisects the city on the west side, and then 377 creates

01:59:35.760 --> 01:59:40.000
 a very stark dividing line with the railroad tracks to the east.

01:59:40.000 --> 01:59:43.080
 All of this is within about a mile and a half span here.

01:59:43.080 --> 01:59:46.920
 So it's very unlikely that once another primary arterial goes through, this would remain rural

01:59:46.920 --> 01:59:48.920
 in character.

01:59:48.920 --> 01:59:53.080
 So it's important to look at this broader area and see the light pink here is community

01:59:53.080 --> 01:59:58.320
 mixed use, which is intended for higher density residential, more intensive commercial uses

01:59:58.320 --> 02:00:02.720
 where Brush Creek or All Red Road will meet I-35.

02:00:02.720 --> 02:00:05.960
 And then moderate density residential is designated to the north.

02:00:05.960 --> 02:00:09.960
 That allows between four and 12 dwelling units per acre.

02:00:09.960 --> 02:00:14.080
 And then we have, of course, a regional park just to the north of this property.

02:00:14.080 --> 02:00:18.400
 So with the proposed development being at about 3.3 units per acre, it does fit comfortably

02:00:18.400 --> 02:00:23.000
 within this transition where we see the more intensive uses on the highway, transitioning

02:00:23.000 --> 02:00:27.720
 to lower intensity uses as we get closer to 377.

02:00:27.720 --> 02:00:32.760
 And then allowing for that transition to the low residential and rural areas that are developed

02:00:32.760 --> 02:00:37.240
 on the east side of highway 377.

02:00:37.240 --> 02:00:39.840
 Criterion two is compliance with the DDC.

02:00:39.840 --> 02:00:44.080
 This table is a repeat of what we saw earlier, just showing that they do intend to either

02:00:44.080 --> 02:00:48.440
 comply with or have enhanced standards compared to the R-6 district.

02:00:48.440 --> 02:00:54.920
 For anything not specified in the PD, they would default back to the DDC standards.

02:00:54.920 --> 02:00:58.640
 Criterion three is whether there's greater building design amenities and connectivity.

02:00:58.640 --> 02:01:03.120
 For building design and architecture, they're proposing compliance with the DDC minimum

02:01:03.120 --> 02:01:04.120
 standards.

02:01:04.120 --> 02:01:08.120
 They are proposing to enhance these lots and residential units with that additional landscaping

02:01:08.120 --> 02:01:13.600
 that I mentioned earlier in terms of additional trees and foundation plantings.

02:01:13.600 --> 02:01:18.240
 In terms of open space and amenities, they're proposing a greater enhancement above the

02:01:18.240 --> 02:01:23.360
 5% minimum, just within those two areas that I called out on their site plan earlier around

02:01:23.360 --> 02:01:28.160
 the amenity center and the ponds, they have 6.4% open space.

02:01:28.160 --> 02:01:32.680
 And then in terms of connectivity, this would substantially improve automotive and pedestrian

02:01:32.680 --> 02:01:35.000
 connectivity in this area of the city.

02:01:35.000 --> 02:01:38.880
 Brush Creek Road is a much needed east-west connection through South Denton, and they

02:01:38.880 --> 02:01:41.080
 would be aiding in the construction of that.

02:01:41.080 --> 02:01:46.120
 And then for pedestrians, within their subdivision, they're proposing that a 10-foot north-south

02:01:46.120 --> 02:01:50.400
 hike bike trail that would allow pedestrians and bikers to connect from the future park

02:01:50.400 --> 02:01:55.000
 to the north to the intended trails that the parks department would eventually develop

02:01:55.000 --> 02:02:02.320
 to the south of here within the flood plain as part of our parks trail system master plan.

02:02:02.320 --> 02:02:06.080
 Criterion four is applicable to residential uses, and that's rather there's compatible

02:02:06.080 --> 02:02:09.400
 buildings, uses, and consistency with the character of the area.

02:02:09.400 --> 02:02:13.580
 This subdivision in terms of density layout and the type of homes that are proposed is

02:02:13.580 --> 02:02:16.960
 consistent with other neighborhoods in Southern Denton, such as Country Lakes and Carnegie

02:02:16.960 --> 02:02:18.300
 Ridge.

02:02:18.300 --> 02:02:22.160
 It's also consistent with the density and housing types that are expected to occur within

02:02:22.160 --> 02:02:25.440
 Hunter and Cole Ranch.

02:02:25.440 --> 02:02:29.500
 The plan does reflect enhancements around the perimeter of the subdivision that would help

02:02:29.500 --> 02:02:34.140
 with that consistency with the character of the area as well as buffering from the railroad,

02:02:34.140 --> 02:02:38.280
 and then includes a variety of perimeter fencing as well as enhanced landscaping and street

02:02:38.280 --> 02:02:41.240
 trees.

02:02:41.240 --> 02:02:44.640
 Criterion five is for PDs proposing non-residential uses.

02:02:44.640 --> 02:02:48.600
 The only of those that are proposed here are the parks and open spaces, which are typical

02:02:48.600 --> 02:02:54.400
 for and encouraged for a residential development such as this.

02:02:54.400 --> 02:02:58.640
 Criterion six has several subcomponents related to the provision of public facilities to support

02:02:58.640 --> 02:03:01.720
 the development, so I'll go through each of those individually.

02:03:01.720 --> 02:03:04.600
 The first is with respect to schools.

02:03:04.600 --> 02:03:10.120
 The expected student generation, according to Denton ISD, is 113 elementary students,

02:03:10.120 --> 02:03:13.760
 59 middle school students, and 74 high schoolers.

02:03:13.760 --> 02:03:16.900
 This property is currently zoned in to McMath Middle School and Denton High School, which

02:03:16.900 --> 02:03:20.160
 both have capacity to support that number of students.

02:03:20.160 --> 02:03:23.720
 It's currently zoned for Borman Elementary School, which does not have capacity at this

02:03:23.720 --> 02:03:28.760
 time, but this development is expected to occur in phases over eight years, so there's

02:03:28.760 --> 02:03:33.360
 the chance for enhanced capacity at that school within that timeframe or for the school to

02:03:33.360 --> 02:03:35.720
 be rezoned to a different attendance zone.

02:03:35.720 --> 02:03:38.960
 There are multiple schools proposed within Hunter and Cole Ranch that would be closer

02:03:38.960 --> 02:03:44.540
 to this property than Borman currently is.

02:03:44.540 --> 02:03:49.160
 Criterion six also includes fire and police provisions.

02:03:49.160 --> 02:03:53.480
 With respect to fire, the closest fire station is just north of here on Vintage Boulevard.

02:03:53.480 --> 02:03:55.380
 It's shown in red on the map.

02:03:55.380 --> 02:03:57.880
 That is well within the eight minute or less response time boundary.

02:03:57.880 --> 02:04:00.000
 That's the standard for our fire department.

02:04:00.000 --> 02:04:04.120
 I reached out to the Denton Police Department, and they indicated this is not expected to

02:04:04.120 --> 02:04:08.240
 have a significant or negative impact on their response times, and they did note that a new

02:04:08.240 --> 02:04:12.240
 police facility will be coming much closer to this in the near future.

02:04:12.240 --> 02:04:15.800
 Near that fire station, there is an additional police facility expected to be operational

02:04:15.800 --> 02:04:19.860
 by 2022.

02:04:19.860 --> 02:04:24.040
 For utilities, the blue lines on this map represent the water lines.

02:04:24.040 --> 02:04:26.120
 There's currently water available along Bonnie Braith.

02:04:26.120 --> 02:04:30.180
 The city also had a major water line extension along Allred.

02:04:30.180 --> 02:04:34.280
 Those lines will be tied into and water services carried throughout the development.

02:04:34.280 --> 02:04:36.700
 The wastewater lines are shown in red on the map.

02:04:36.700 --> 02:04:42.540
 The closest line for them to tie to is to the east of here down Brush Creek Road at what's

02:04:42.540 --> 02:04:43.940
 called the Graveyard Interceptor.

02:04:43.940 --> 02:04:47.400
 They would make a connection at that point and extend the line down Brush Creek across

02:04:47.400 --> 02:04:53.360
 the railroad tracks and across the site and throughout to serve the development.

02:04:53.360 --> 02:04:56.620
 That main line extension down Brush Creek, they are expected to participate with the

02:04:56.620 --> 02:05:00.920
 city to oversize that line to make sure it can accommodate the capacity and demand of

02:05:00.920 --> 02:05:06.080
 this area as future development occurs.

02:05:06.080 --> 02:05:10.160
 With respect to streets, there's several major roadways at play here.

02:05:10.160 --> 02:05:12.100
 The first of those would be Brush Creek Road.

02:05:12.100 --> 02:05:16.920
 As I mentioned earlier, they would be dedicating the 120 feet of right-of-way width for that

02:05:16.920 --> 02:05:19.080
 primary arterial to be extended.

02:05:19.080 --> 02:05:23.040
 They would be responsible for constructing half of that, so two lanes adjacent to their

02:05:23.040 --> 02:05:26.340
 development to provide access in the interim.

02:05:26.340 --> 02:05:31.240
 The city did conduct a regional traffic study within the last year to look at this road

02:05:31.240 --> 02:05:34.000
 and its possible alignments.

02:05:34.000 --> 02:05:38.480
 As a result of that study and some of the specific site engineering that we were able

02:05:38.480 --> 02:05:42.580
 to look at with this development, the potential alignment for that was determined and that's

02:05:42.580 --> 02:05:45.680
 what's reflected on the plans for this development.

02:05:45.680 --> 02:05:51.120
 That alignment really came down to needing to kind of thread the needle between the major

02:05:51.120 --> 02:05:56.240
 features on this site, that being the floodplain, which is zone A floodplain along the tributary

02:05:56.240 --> 02:06:02.200
 to the south that's shown in blue on this map and then the gas well that I mentioned

02:06:02.200 --> 02:06:07.360
 on the northwest corner of this property that plugged well did not need to be within city

02:06:07.360 --> 02:06:10.480
 right-of-way or underneath the roadway, so they had to squeeze in between those two with

02:06:10.480 --> 02:06:14.880
 this road and that's what's reflected on the plans.

02:06:14.880 --> 02:06:19.180
 The other roadways that this property has connection to are Bonnie Bray Street.

02:06:19.180 --> 02:06:22.840
 The very southern end of that is on the east side of this property.

02:06:22.840 --> 02:06:26.860
 When they make that railroad connection at Brush Creek, as part of that getting that

02:06:26.860 --> 02:06:32.300
 new connection, the city does have to close the crossing at Bonnie Bray, which is currently

02:06:32.300 --> 02:06:36.980
 considered very unsafe because of the limited stacking space and the odd and very sharp

02:06:36.980 --> 02:06:41.700
 angle of that connection, so that would be south Bonnie Bray would be closed south of

02:06:41.700 --> 02:06:45.160
 Allred Road at that point in time.

02:06:45.160 --> 02:06:49.560
 Allred Road to the north side of this property would not be improved at this time.

02:06:49.560 --> 02:06:53.600
 Its current status is sufficient to serve this development for the initial phase.

02:06:53.600 --> 02:06:57.780
 The city is expected to make those improvements in the future, either when the park develops

02:06:57.780 --> 02:07:01.560
 or when an additional development occurs in this area that would generate the need for

02:07:01.560 --> 02:07:03.360
 those improvements.

02:07:03.360 --> 02:07:07.560
 The primary entrance to this site, as we saw on the plan earlier, is near that amenity

02:07:07.560 --> 02:07:08.560
 center.

02:07:08.560 --> 02:07:11.160
 It would occur on Brush Creek roughly in this part of the property and then they would have

02:07:11.160 --> 02:07:15.080
 secondary access further to the west on Brush Creek as well as one point of access to the

02:07:15.080 --> 02:07:21.960
 north at Allred that would align with the primary entrance to the park.

02:07:21.960 --> 02:07:23.680
 Parks are the final component of this.

02:07:23.680 --> 02:07:28.920
 The area in green is the area of that future southwest park that I mentioned earlier that

02:07:28.920 --> 02:07:33.280
 is a regional scale city park, so think North Lakes Park or something of that nature in

02:07:33.280 --> 02:07:35.560
 terms of amenities that will be there.

02:07:35.560 --> 02:07:40.200
 The city is currently negotiating with a consultant to develop the master plan for that park,

02:07:40.200 --> 02:07:44.980
 so it is underway and in development at this time.

02:07:44.980 --> 02:07:49.200
 In addition, as I mentioned earlier, the developer is proposing to dedicate the land area south

02:07:49.200 --> 02:07:53.680
 of Brush Creek Road for future trail connections by the parks department.

02:07:53.680 --> 02:07:56.840
 As part of the trails master plan, they are focusing on providing trails throughout the

02:07:56.840 --> 02:08:00.720
 city in our floodplain areas, so this would tie into that.

02:08:00.720 --> 02:08:04.400
 And then park dedication and development fees would apply to this project at the time of

02:08:04.400 --> 02:08:07.880
 platting and permitting.

02:08:07.880 --> 02:08:12.960
 I wanted to mention briefly the fiscal impact analysis that was done as part of the annexation

02:08:12.960 --> 02:08:18.440
 of this property, just to give you some estimates with its current agricultural use.

02:08:18.440 --> 02:08:22.600
 Its current property tax revenue is about $377 a year.

02:08:22.600 --> 02:08:29.140
 The estimated annual tax revenue at full build out would be $967,000 roughly.

02:08:29.140 --> 02:08:34.160
 And then when you look at the cost of service, that nets out to about $87,000 in incremental

02:08:34.160 --> 02:08:36.000
 tax revenue.

02:08:36.000 --> 02:08:41.320
 The construction fees and sales taxes would be significant for this development.

02:08:41.320 --> 02:08:46.680
 Our current rates permitting inspections and impact fees would come out to about $8.5 million.

02:08:46.680 --> 02:08:50.280
 Local sales tax related to the construction of this subdivision would come out to about

02:08:50.280 --> 02:08:53.800
 $1.2 million over that eight-year build out.

02:08:53.800 --> 02:08:58.320
 In addition to those quantitative impacts, though, it's also important to just kind of

02:08:58.320 --> 02:09:02.400
 think about the qualitative impact, so I want to summarize some of those before we get into

02:09:02.400 --> 02:09:05.040
 the conclusion of this and move on to comments.

02:09:05.040 --> 02:09:08.920
 A gas well was plugged in anticipation of this development.

02:09:08.920 --> 02:09:13.820
 The developer will be contributing a significant amount of benefit to the city in terms of

02:09:13.820 --> 02:09:18.120
 Brush Creek being extended and the right of way dedicated across this property.

02:09:18.120 --> 02:09:24.160
 The railroad crossing at 377 will be significantly improved and made safer with this development.

02:09:24.160 --> 02:09:28.480
 Extending Brush Creek Road, because that unsafe crossing at Bonnie Bray would be closed.

02:09:28.480 --> 02:09:32.220
 And then there is a significant amount of contribution to our park system and our trail

02:09:32.220 --> 02:09:38.720
 system with the dedications and the hike and bike trail through the subdivision.

02:09:38.720 --> 02:09:41.960
 Notification was provided for this zoning case.

02:09:41.960 --> 02:09:46.840
 We received one response in favor that's from the current property owner, the Birch family.

02:09:46.840 --> 02:09:49.560
 Three oppositions were recorded just today.

02:09:49.560 --> 02:09:51.680
 One of those was emailed to you all earlier.

02:09:51.680 --> 02:09:56.880
 And then two additional ones we located at City Hall that were delivered by mail.

02:09:56.880 --> 02:10:00.640
 I wanted to read those into the record to make sure they get recorded.

02:10:00.640 --> 02:10:04.560
 The first is from Morgan Trail at 4789 South Bonnie Bray Street.

02:10:04.560 --> 02:10:09.640
 She is opposed and her comments were to quit trying to put neighborhoods near us.

02:10:09.640 --> 02:10:14.880
 She says they all want to, they all start out wanting to rezone only to sell out to

02:10:14.880 --> 02:10:18.000
 other developers, keep Argyle rural.

02:10:18.000 --> 02:10:22.680
 And then Brian Trail also at 4789 South Bonnie Bray is opposed and said, no more requests

02:10:22.680 --> 02:10:24.060
 for neighborhoods.

02:10:24.060 --> 02:10:26.720
 We live right across the street from this one.

02:10:26.720 --> 02:10:31.160
 I also wanted to note in your backup, there were six additional responses provided that

02:10:31.160 --> 02:10:36.160
 were in favor of this request from areas outside of the scope of these notices.

02:10:36.160 --> 02:10:40.360
 Those responses were provided to the developer when he first started the annexation process

02:10:40.360 --> 02:10:41.760
 for this subdivision.

02:10:41.760 --> 02:10:45.280
 So those weren't directly tied to the notices that the city sent, but I wanted to mention

02:10:45.280 --> 02:10:48.080
 that those were in your backup as well.

02:10:48.080 --> 02:10:51.080
 There was a neighborhood meeting held on January 31st.

02:10:51.080 --> 02:10:55.280
 There were approximately 12 attendees at that meeting.

02:10:55.280 --> 02:10:59.380
 And staff is recommending approval of this request as it complies with the general criteria

02:10:59.380 --> 02:11:03.320
 as well as the PD specific criteria for approval.

02:11:03.320 --> 02:11:08.640
 And if this progresses for tonight, it would be scheduled for city council on June 2nd.

02:11:08.640 --> 02:11:12.600
 And I believe the developers here and they do have a presentation that they would like

02:11:12.600 --> 02:11:13.600
 to give as well.

02:11:13.600 --> 02:11:14.600
 Great.

02:11:14.600 --> 02:11:17.640
 Thank you so much for that.

02:11:17.640 --> 02:11:20.120
 You did say the applicant has a presentation, correct?

02:11:20.120 --> 02:11:21.120
 Correct.

02:11:21.120 --> 02:11:22.120
 Okay.

02:11:22.120 --> 02:11:23.120
 Let's start with that.

02:11:23.120 --> 02:11:26.240
 Or is there any questions for Haley right now?

02:11:26.240 --> 02:11:29.640
 Thank you, chair.

02:11:29.640 --> 02:11:31.040
 Hey, Haley.

02:11:31.040 --> 02:11:36.960
 We've had a couple of projects recently where DISD after their analysis said elementary

02:11:36.960 --> 02:11:39.040
 schools did not have capacity.

02:11:39.040 --> 02:11:48.320
 Do they offer any other feedback to you other than the numbers and capacity or not?

02:11:48.320 --> 02:11:49.320
 Typically not.

02:11:49.320 --> 02:11:53.960
 In some cases, like one of our recent rezoning on Ryan road, they indicated that they could

02:11:53.960 --> 02:11:56.760
 zone that into another school relatively easily.

02:11:56.760 --> 02:11:59.760
 They actually kept in contact with me after that.

02:11:59.760 --> 02:12:03.200
 And within a month, they had changed the attendance zone for that project.

02:12:03.200 --> 02:12:08.560
 So I think as development comes in, they adapt and respond pretty quickly to those changes.

02:12:08.560 --> 02:12:09.560
 Okay.

02:12:09.560 --> 02:12:10.560
 Very good.

02:12:10.560 --> 02:12:11.560
 Thanks.

02:12:11.560 --> 02:12:12.560
 Commissioner Beck.

02:12:12.560 --> 02:12:17.280
 Yeah, this exactly falls on Commissioner Ellis's question.

02:12:17.280 --> 02:12:31.000
 And that is, does the district, the school district, when they adapt and are forced to

02:12:31.000 --> 02:12:38.080
 switch the school zones around, do they give you any estimate of general capacity in the

02:12:38.080 --> 02:12:44.560
 south and southwest that for, it just follows exactly on from Commissioner Ellis's question.

02:12:44.560 --> 02:12:48.680
 It seems like we're cramming a lot of elementary kids into these areas and the school district

02:12:48.680 --> 02:12:52.280
 keeps saying, no, we can't do that.

02:12:52.280 --> 02:12:58.760
 And they kind of, we kind of make them make it work by continuing to have development.

02:12:58.760 --> 02:13:00.920
 And that concerns me.

02:13:00.920 --> 02:13:10.000
 Do they talk about their general southwest capacity for students when you talk to them?

02:13:10.000 --> 02:13:11.000
 They did not.

02:13:11.000 --> 02:13:13.640
 They didn't indicate opposition to this case necessarily.

02:13:13.640 --> 02:13:17.520
 They just provided us the data and let us know their current capacity.

02:13:17.520 --> 02:13:21.280
 But again, I think it's important to keep in mind that those are current capacities

02:13:21.280 --> 02:13:25.500
 that they're looking at and this, that amount of students wouldn't potentially be there

02:13:25.500 --> 02:13:30.840
 until eight years or more in the future based on the phasing for this subdivision.

02:13:30.840 --> 02:13:35.480
 And then as we recently saw with Hunter and Cole Ranch being approved, there are properties

02:13:35.480 --> 02:13:40.860
 slated for other elementary schools in the south and western part of Denton in the near

02:13:40.860 --> 02:13:45.120
 future as well.

02:13:45.120 --> 02:13:46.120
 Thank you.

02:13:46.120 --> 02:13:52.480
 Haley, I had one question really quickly, if it's possible to share your screen again

02:13:52.480 --> 02:14:04.480
 and go back to the fiscal impact.

02:14:04.480 --> 02:14:05.480
 Thank you.

02:14:05.480 --> 02:14:12.360
 It's very enlightening to see these numbers, even if they're kind of rough estimates.

02:14:12.360 --> 02:14:17.520
 But I had one specific question on the calculation for our own edification.

02:14:17.520 --> 02:14:22.320
 On the left-hand side, it says local sales tax over the eight years is 1.2 million.

02:14:22.320 --> 02:14:27.120
 And then on the table on the right side of the screen under direct effects from construction,

02:14:27.120 --> 02:14:39.800
 it says construction materials purchased locally would be 31,443,000 is one is locally defined

02:14:39.800 --> 02:14:44.000
 as city of Denton because over at the 1.2, it says local sales tax.

02:14:44.000 --> 02:14:48.320
 So I'm wondering how geographically specific locally means.

02:14:48.320 --> 02:14:53.880
 And if that is the city of Denton, is the taxes on that construction material taken

02:14:53.880 --> 02:14:58.360
 into consideration on the local sales tax number of 1.2?

02:14:58.360 --> 02:15:04.920
 Or any sales tax on that 31 million would be additional revenue potentially for the

02:15:04.920 --> 02:15:14.520
 city not reflected on the left-hand side of this slide.

02:15:14.520 --> 02:15:19.600
 I was trying to look through the analysis and see if they specified or defined the term

02:15:19.600 --> 02:15:21.600
 local.

02:15:21.600 --> 02:15:26.400
 I don't know that they do other than it references the Denton area.

02:15:26.400 --> 02:15:27.400
 Okay.

02:15:27.400 --> 02:15:32.800
 Well, let's not worry about if it's 100% or 10%.

02:15:32.800 --> 02:15:38.640
 The taxes that the city would obtain off whatever that number would be of construction materials

02:15:38.640 --> 02:15:44.280
 that sold in the city, that's additional revenue not reflected on the summary of the left-hand

02:15:44.280 --> 02:15:49.680
 side of the screen, am I correct?

02:15:49.680 --> 02:15:57.160
 I believe the local sales tax total is inclusive of the construction materials.

02:15:57.160 --> 02:15:59.760
 That was my understanding of the analysis.

02:15:59.760 --> 02:16:02.040
 Okay.

02:16:02.040 --> 02:16:05.720
 That is the clarification that I was hoping for.

02:16:05.720 --> 02:16:07.720
 Commissioner Beck.

02:16:07.720 --> 02:16:09.320
 Thank you, Chair.

02:16:09.320 --> 02:16:18.440
 Haley, can you educate me on how drainage and floodplain is included in the calculation

02:16:18.440 --> 02:16:25.200
 of green space and parks for developments?

02:16:25.200 --> 02:16:27.760
 I am not an expert on our parks ordinance.

02:16:27.760 --> 02:16:34.200
 I believe for areas that are floodplain, there is kind of a multiplier there.

02:16:34.200 --> 02:16:38.320
 I think, Richard, do you know there's a 50% credit for those areas?

02:16:38.320 --> 02:16:39.880
 I don't know.

02:16:39.880 --> 02:16:45.340
 I believe it's either a 25% or a 50% credit that they can receive for those areas.

02:16:45.340 --> 02:16:49.900
 If there was eight acres of park dedication needed and they had 16 acres of floodplain,

02:16:49.900 --> 02:16:52.240
 I think that would be somewhat equivalent.

02:16:52.240 --> 02:16:53.240
 There's a multiplier in there.

02:16:53.240 --> 02:17:00.360
 I don't recall the exact amount, but it is a reduced value, if you will, for floodplain

02:17:00.360 --> 02:17:03.280
 within our current parks ordinance.

02:17:03.280 --> 02:17:07.440
 That can certainly still be dedicated to the city because our parks master plan is relying

02:17:07.440 --> 02:17:13.040
 heavily upon floodplain areas to provide those trail connections throughout the city because

02:17:13.040 --> 02:17:20.680
 our riparian corridors do spider, you know, across the majority of the city, so they would

02:17:20.680 --> 02:17:26.840
 provide some useful avenues for connectivity in areas such as this.

02:17:26.840 --> 02:17:29.680
 I'm not sure, Richard, were you able to?

02:17:29.680 --> 02:17:32.440
 Yeah, I'm looking for it right now.

02:17:32.440 --> 02:17:40.200
 While he looks that up, I have sort of a related question, and that is, does the police facility

02:17:40.200 --> 02:17:47.340
 there north of the new park, that's the firing range that's going to put us in compliance

02:17:47.340 --> 02:17:50.040
 with the response time?

02:17:50.040 --> 02:17:56.120
 Yes, I believe that is a training facility as well as a police station where officers

02:17:56.120 --> 02:18:00.860
 would be stationed out of, but yes, I believe that does include the firing range as part

02:18:00.860 --> 02:18:02.440
 of that training facility.

02:18:02.440 --> 02:18:08.120
 But I guess that's, you sort of, I think answered that question, is there will actually be stationed

02:18:08.120 --> 02:18:10.400
 officers in that facility?

02:18:10.400 --> 02:18:16.440
 It's not just a training facility, they would be able to respond out of that facility.

02:18:16.440 --> 02:18:22.320
 That was my understanding from the police department's response when I asked about this.

02:18:22.320 --> 02:18:27.200
 Any other questions for Haley?

02:18:27.200 --> 02:18:29.760
 Right now I'm sure there might be more, but...

02:18:29.760 --> 02:18:34.680
 Just to respond on the floodplain acreage, it's a three to one, so floodplain acreage

02:18:34.680 --> 02:18:40.040
 may be dedicated at a ratio of three to one in lieu of non-floodplain property.

02:18:40.040 --> 02:18:45.680
 So if I can clarify that, three acres, they get a credit for one?

02:18:45.680 --> 02:18:46.680
 Correct.

02:18:46.680 --> 02:18:49.520
 Okay, thank you.

02:18:49.520 --> 02:18:55.840
 At this time, I understand the applicant does have a presentation, so I'll invite them to

02:18:55.840 --> 02:18:59.680
 be unmuted and present, if you could, whoever is presenting, if they could just state their

02:18:59.680 --> 02:19:17.280
 name and address for the record.

02:19:17.280 --> 02:19:42.280
 It should be either Randy Rivera or Doug Powell with McAdams, and then Rob Betancur representing

02:19:42.280 --> 02:19:45.800
 Zena, if that helps.

02:19:45.800 --> 02:19:47.960
 Hi, this is Randy.

02:19:47.960 --> 02:19:50.040
 Good evening.

02:19:50.040 --> 02:19:51.040
 I think I started...

02:19:51.040 --> 02:19:52.040
 Good evening.

02:19:52.040 --> 02:19:58.120
 I think I started talking a little too early, but okay, so yes, Randy Rivera, I'm a planner

02:19:58.120 --> 02:20:05.120
 with McAdams at 111 Hillside Drive in Lewisville, Texas.

02:20:05.120 --> 02:20:12.120
 Doug Powell is another planner on this project, and he is here with me, and also on the phone

02:20:12.120 --> 02:20:22.440
 is Rob Betancur, our client and the developer with Zena Land Development out of Grapevine.

02:20:22.440 --> 02:20:32.040
 And we are happy and glad to be able to present to you tonight this request for this 146 acres.

02:20:32.040 --> 02:20:38.840
 We have had the pleasure of working with Haley and the planning staff and the other departments.

02:20:38.840 --> 02:20:46.120
 Over the course of almost a couple of years now, and we were able to come in with P&Z

02:20:46.120 --> 02:20:54.680
 to do a work session in late January to really kind of introduce this project to you prior

02:20:54.680 --> 02:20:58.320
 to tonight.

02:20:58.320 --> 02:21:05.440
 And so our application was submitted for initially, not necessarily for the zoning, but when we

02:21:05.440 --> 02:21:10.800
 were in the ETJ, we turned in our first application in December of 2018.

02:21:10.800 --> 02:21:15.240
 And so we have been around for a little while, working through the different code updates

02:21:15.240 --> 02:21:17.240
 and making changes as needed.

02:21:17.240 --> 02:21:23.840
 And it's been a very enjoyable experience working with staff, and we're glad to finally

02:21:23.840 --> 02:21:26.720
 be able to be in front of you tonight for this request.

02:21:26.720 --> 02:21:34.040
 So I'll start off, and Haley, I'll just number which slide to jump to, because I do not want

02:21:34.040 --> 02:21:38.640
 to spend time, you know, going over things that you did a great job already covering

02:21:38.640 --> 02:21:39.640
 in detail.

02:21:39.640 --> 02:21:49.560
 And so Sagebrook, again, is a, you know, 491 lot subdivision and the, you know, the style

02:21:49.560 --> 02:21:55.360
 and the theme and the entry features are pretty reminiscent of, like, a Texas country style

02:21:55.360 --> 02:22:00.720
 using some natural elements and that we wanted to pull from this area.

02:22:00.720 --> 02:22:05.520
 And if you can go ahead and go to slide two.

02:22:05.520 --> 02:22:11.880
 And this is taken off of the city's map, just showing, again, this donut area that we talked

02:22:11.880 --> 02:22:17.680
 that Haley talked about too, of ETJ land in the southwest part of the city.

02:22:17.680 --> 02:22:23.120
 And Sagebrook is highlighted in yellow, I think you know where it is at this point,

02:22:23.120 --> 02:22:29.760
 and that we are asking for a zoning change for all 146 acres for this PD to be consistent

02:22:29.760 --> 02:22:32.520
 with our six uses.

02:22:32.520 --> 02:22:39.120
 I'd like to go ahead and jump to slide, actually the next one, slide three, please.

02:22:39.120 --> 02:22:44.360
 Showing a location of our property, you know, with 35 being so close, it really is about

02:22:44.360 --> 02:22:48.680
 a quarter mile from our northwest corner.

02:22:48.680 --> 02:22:57.040
 And then with a railroad to the east, it really acts as a kind of a dividing line, you know,

02:22:57.040 --> 02:23:02.080
 from dividing the east to the west, and, you know, that this area is treated a little bit

02:23:02.080 --> 02:23:09.840
 differently than the properties up and down 377 on the east side that aren't constrained

02:23:09.840 --> 02:23:14.560
 by that railroad crossing, which limits the access.

02:23:14.560 --> 02:23:17.480
 Slide four will be the next one.

02:23:17.480 --> 02:23:24.760
 And what we did here is we overlaid the city boundaries so that, you know, you can clearly

02:23:24.760 --> 02:23:28.520
 see this land has been left over in the ETJ.

02:23:28.520 --> 02:23:34.120
 And I think it's a safe, you know, kind of guess at this point that at some point in

02:23:34.120 --> 02:23:38.640
 the future, this land will be annexed into the city of Denton since it's completely surrounded

02:23:38.640 --> 02:23:39.640
 by it.

02:23:39.640 --> 02:23:44.800
 It's just kind of how we fit in there and you can see the 14 acres that's already within

02:23:44.800 --> 02:23:48.200
 the city that is the zone R6.

02:23:48.200 --> 02:23:59.880
 Slide five will be the next one, and we wanted to show how our 146 acres fit into the context

02:23:59.880 --> 02:24:06.740
 of these enormous master plan communities with Hunter and Coal Ranch.

02:24:06.740 --> 02:24:12.040
 And on this graphic, you can also see the Brush Creek extension that follows the flood

02:24:12.040 --> 02:24:22.120
 plain and then intersects with 377, but this plan here had a lot to do with the proposal

02:24:22.120 --> 02:24:28.400
 before you tonight and that, you know, to match up with similar uses in the area to

02:24:28.400 --> 02:24:34.000
 be consistent with what's expected, what people are seeing, what the city is seeing, the community

02:24:34.000 --> 02:24:36.000
 and the neighbors.

02:24:36.000 --> 02:24:44.400
 And so you can see as we transition from Hunter-Coal's MN zoning district, which is the nearest to

02:24:44.400 --> 02:24:53.560
 be developed areas of those MPCs to Sagebrook, we transition into an R6 density as we get

02:24:53.560 --> 02:25:00.280
 to the railroad and 377 as Haley talked about this being a highly transitional area.

02:25:00.280 --> 02:25:06.560
 And that is exactly the plan that we're proposing that works, it's very, it's feasible.

02:25:06.560 --> 02:25:12.920
 And again, it just fits into the context of the surrounding PDs as well as Hunter-Coal.

02:25:12.920 --> 02:25:20.320
 Slide six shows the parts and amenities of Hunter-Coal on the left.

02:25:20.320 --> 02:25:28.200
 And then on the right are the regional and kind of local trails.

02:25:28.200 --> 02:25:33.360
 And what we think is significant and the reason for sharing this with you, just the context

02:25:33.360 --> 02:25:39.480
 of this, how it applies to Sagebrook, is the interconnectedness of all of the greenways

02:25:39.480 --> 02:25:47.840
 as those are natural linkages to provide for pedestrian opportunities and activities, cyclists

02:25:47.840 --> 02:25:54.600
 and all of those types of activities to enjoy in these green belts that connect the community

02:25:54.600 --> 02:25:56.120
 together.

02:25:56.120 --> 02:26:05.560
 And the benefit of Sagebrook's location is we are able to provide a link to residents

02:26:05.560 --> 02:26:12.800
 from Hunter-Coal, from Country Lakes to come up through these trail systems into Sagebrook

02:26:12.800 --> 02:26:19.800
 and eventually into Southwest Regional Park there for the sports activities that they'll

02:26:19.800 --> 02:26:23.680
 be doing with their kids and families.

02:26:23.680 --> 02:26:30.720
 And that magenta line that you see on the right, the dashed magenta in the yellow box,

02:26:30.720 --> 02:26:33.560
 that's the proposed trail linkage.

02:26:33.560 --> 02:26:39.880
 We're providing a piece of that, but the idea again is to create consistent connectivity

02:26:39.880 --> 02:26:45.560
 for people to access Southwest Park through Sagebrook.

02:26:45.560 --> 02:26:55.000
 I would like to go ahead and jump to slide 10 and slide 10 shows the existing site characteristics

02:26:55.000 --> 02:27:04.000
 of the property and kind of what we were working with in our canvas and as designers, working

02:27:04.000 --> 02:27:10.440
 with what the land has given you to work around features that are worth preserving and identifying

02:27:10.440 --> 02:27:15.000
 those before we really put any pencil to paper.

02:27:15.000 --> 02:27:21.640
 This slide here shows you of course the flood in the southwest corner, it's 14 acres of

02:27:21.640 --> 02:27:29.200
 zone A floodplain, and then the terrain on here, it's a pretty consistent slope from

02:27:29.200 --> 02:27:33.920
 the north and northwest down to the southeast corner.

02:27:33.920 --> 02:27:41.120
 And there's about a 30-foot average fall of terrain from those two points to the southeast

02:27:41.120 --> 02:27:47.520
 corner, which makes sense and why the floodplain is where it is.

02:27:47.520 --> 02:27:52.800
 And so looking at this, looking at the tree cover canopy that's there on the property

02:27:52.800 --> 02:28:01.560
 today, the mature and protected trees, the nice trees that are located in that southeast

02:28:01.560 --> 02:28:06.400
 corner, which makes sense, that's where most of the drainage is going.

02:28:06.400 --> 02:28:13.280
 And so we wanted to work around those elements as we came up with the design here.

02:28:13.280 --> 02:28:18.400
 And the rest of the gas well being plugged with a huge, huge plus that we could work

02:28:18.400 --> 02:28:20.720
 around that.

02:28:20.720 --> 02:28:26.840
 But with this blank canvas, what do we do to create an interesting design?

02:28:26.840 --> 02:28:32.440
 And that has a lot to do with why we're proposing this meandering north-south boulevard.

02:28:32.440 --> 02:28:38.080
 So if you can go ahead and go to slide 11, please.

02:28:38.080 --> 02:28:48.880
 The concept plan that Haley showed, too, the signifying feature of Sagebrook is the open

02:28:48.880 --> 02:28:54.400
 space that we're providing, that 18 percent of open space throughout the community, but

02:28:54.400 --> 02:29:02.400
 also this public accessible corridor through the middle of it from north to south at the

02:29:02.400 --> 02:29:10.640
 length of about 1,200 to 1,500 feet in length, that acts as kind of a theme and it brings

02:29:10.640 --> 02:29:19.680
 the community together and a focal point for the residents and an access for public community

02:29:19.680 --> 02:29:25.360
 members to be able, again, to traverse up this trail up to Southwest Park.

02:29:25.360 --> 02:29:30.360
 And so that was kind of our starting point in the design as well as what we were saving.

02:29:30.360 --> 02:29:36.900
 You see the pond in the southeast corner, wanted to save that natural open space area.

02:29:36.900 --> 02:29:43.240
 It will create for a very nice driving experience, a long brush creek, and also a natural setting

02:29:43.240 --> 02:29:46.880
 for the residents to enjoy.

02:29:46.880 --> 02:29:51.160
 And then in the northeast corner is another detention pond.

02:29:51.160 --> 02:29:58.560
 There is a little bit of the way the site is, the fall of the site, some of it goes

02:29:58.560 --> 02:30:04.600
 to that corner, so it's necessary to put a detention facility there.

02:30:04.600 --> 02:30:11.960
 And so those were kind of the design focal points that we wanted to include in this layout

02:30:11.960 --> 02:30:18.000
 to make it unique, working with the land and coming up with something that was creative.

02:30:18.000 --> 02:30:22.400
 And so here you can see all the things that Haley kind of already touched on.

02:30:22.400 --> 02:30:27.520
 We are dedicating about 12 acres of perimeter right away, and within the Sagebrook community

02:30:27.520 --> 02:30:33.720
 there is about nine acres of open space in the x-lots, but that doesn't include the landscape

02:30:33.720 --> 02:30:41.400
 buffers along the future brush creek extension or all red.

02:30:41.400 --> 02:30:45.880
 And so let's go ahead and go to slide 12, please.

02:30:45.880 --> 02:30:53.440
 I apologize for that, I just wanted to check in, it is my fault for not starting a proper

02:30:53.440 --> 02:30:57.960
 clock when you began, but typically applicants have 10 minutes to present, and so I want

02:30:57.960 --> 02:31:01.440
 to be mindful of that for the individual I think who is waiting on the phone to do public

02:31:01.440 --> 02:31:02.600
 comment as well.

02:31:02.600 --> 02:31:06.880
 So I certainly want to be respectful of your presentation, but we have been at about 12

02:31:06.880 --> 02:31:11.160
 minutes right now, so if we can get to high points and then we can certainly follow up

02:31:11.160 --> 02:31:13.200
 with questions, that might be helpful.

02:31:13.200 --> 02:31:19.360
 Okay, well I think the next high point would probably be slide 20, again that's showing

02:31:19.360 --> 02:31:24.280
 representative examples of what the homes will look like, these are 50-foot lots, so

02:31:24.280 --> 02:31:31.600
 the products will be 40 feet wide, and the average price point here is around $340, and

02:31:31.600 --> 02:31:38.360
 they'll start at the low or the high $200 and go up to the high $300.

02:31:38.360 --> 02:31:45.880
 And then I think the next important slide that I just wanted to touch on is, we can

02:31:45.880 --> 02:31:50.200
 go ahead and go to slide 26, and then I can conclude after that.

02:31:50.200 --> 02:31:51.200
 Great, thank you.

02:31:51.200 --> 02:31:56.240
 Slide 26, you're welcome, and thank you so much for letting me know I wasn't aware we

02:31:56.240 --> 02:31:57.240
 had 10 minutes.

02:31:57.240 --> 02:32:00.160
 Yeah, that was my fault, no worries.

02:32:00.160 --> 02:32:02.680
 Okay, give me some grace on that.

02:32:02.680 --> 02:32:07.400
 Okay, so the public benefits again, we're dedicating with the development 120 feet of

02:32:07.400 --> 02:32:11.080
 the right of way for the Brush Creek extension, that's 9.2 acres of land that's going to

02:32:11.080 --> 02:32:17.640
 be dedicated when we plot, and then we have agreed to develop and construct two of those

02:32:17.640 --> 02:32:21.640
 lanes per the phases that come online.

02:32:21.640 --> 02:32:27.120
 We have worked with Union Pacific Railroad on the changing the crossing from Bonnie Bray

02:32:27.120 --> 02:32:32.600
 to this location, they have told us that they will not permit a new additional crossing

02:32:32.600 --> 02:32:40.800
 along 377, but we have to replace crossings that are already there, and this one has been

02:32:40.800 --> 02:32:47.040
 identified as an unsafe crossing on Bonnie Bray, and it makes sense to replace it to

02:32:47.040 --> 02:32:51.840
 come down here on a brush on brush Creek extension where there's going to be more motorists and

02:32:51.840 --> 02:32:53.600
 more traffic there.

02:32:53.600 --> 02:33:00.160
 And then the last thing and then I'm done is extending about 3500 feet of sanitary sewer

02:33:00.160 --> 02:33:02.600
 from the graveyard interceptor.

02:33:02.600 --> 02:33:06.320
 And like Haley mentioned, this will be up sized as necessary, we'll work with the city

02:33:06.320 --> 02:33:12.360
 on our developers agreement, and it will service an area of about 580 acres, and so Sagebrook

02:33:12.360 --> 02:33:15.160
 is really only a quarter of that.

02:33:15.160 --> 02:33:20.720
 And so I will wrap up, I'll be glad to wrap up, and we're also here for any questions

02:33:20.720 --> 02:33:24.480
 of the council and the chairman, if you see fit.

02:33:24.480 --> 02:33:29.120
 I certainly appreciate your presentation and your perspective and context of the project,

02:33:29.120 --> 02:33:30.120
 thank you very much.

02:33:30.120 --> 02:33:36.560
 Do you have any questions right now for the applicant?

02:33:36.560 --> 02:33:41.640
 I don't see any hands raised, so we're going to proceed forward.

02:33:41.640 --> 02:33:49.200
 For this item PD 20-001, we had one person make comments using our online form.

02:33:49.200 --> 02:33:53.800
 There was zero in support for the item and one against.

02:33:53.800 --> 02:33:58.480
 All these comment forms were emailed to the city secretary to be recorded, and additionally

02:33:58.480 --> 02:34:03.240
 there is one individual who has requested to speak over the phone on this item, and

02:34:03.240 --> 02:34:10.360
 staff is currently loading up the phone line for that caller.

02:34:10.360 --> 02:34:25.840
 Hello, caller, welcome to the planning and zoning commission meeting, can you please

02:34:25.840 --> 02:34:29.640
 state your name and address, and you'll have four minutes to speak on this item.

02:34:29.640 --> 02:34:35.800
 Yes, it is Angela Dominguez, and I reside at 6250 Allred Road.

02:34:35.800 --> 02:34:39.760
 Thank you for taking my call and giving me the opportunity to speak.

02:34:39.760 --> 02:34:45.760
 My husband and I live on the 35 acres bordering the western property line of the proposed

02:34:45.760 --> 02:34:51.560
 Sagebrook development, and we own and farm 96 acres bordering the southern property line

02:34:51.560 --> 02:34:53.560
 of the proposed development.

02:34:53.560 --> 02:34:58.380
 No one will be impacted more by this development than me and my husband.

02:34:58.380 --> 02:35:03.800
 We are opposing the zoning change request to allow more time to discuss the alignment

02:35:03.800 --> 02:35:09.520
 of the Brush Creek extension with the city and the developer, and to verify the reasons

02:35:09.520 --> 02:35:14.080
 for the alignment by an engineer or qualified third party.

02:35:14.080 --> 02:35:21.520
 In July 2019, we received a notice for the Hickory Creek road feasibility study and a

02:35:21.520 --> 02:35:27.040
 request by the city of Denton for right-of-way entry to our property.

02:35:27.040 --> 02:35:31.700
 An exhibit was included with a notice that showed two proposed alignments of the Brush

02:35:31.700 --> 02:35:37.240
 Creek extension labeled 3A, 3E, and 3H.

02:35:37.240 --> 02:35:41.680
 Both proposed alignments showed Brush Creek intersecting Allred Road to the east of our

02:35:41.680 --> 02:35:46.440
 property line at the northwest corner of the subject property.

02:35:46.440 --> 02:35:52.920
 I called Mr. Jim Jenkins, who was Senior Engineer of Capital Projects at the time, to discuss

02:35:52.920 --> 02:35:59.320
 the proposed alignment, and he confirmed that the exhibit accurately represented the future

02:35:59.320 --> 02:36:02.080
 alignment of Brush Creek at that time.

02:36:02.080 --> 02:36:07.960
 I thanked him for the information and granted right of entry to our property for the feasibility

02:36:07.960 --> 02:36:09.920
 study.

02:36:09.920 --> 02:36:15.200
 When the notice of public hearing signs for Sagebrook were posted on Allred Road, I noted

02:36:15.200 --> 02:36:18.280
 them and fully intended to listen to this hearing.

02:36:18.280 --> 02:36:23.560
 However, the signs and the notice that we received in the mail referenced a request

02:36:23.560 --> 02:36:29.160
 for a zoning change, not a future extension of Brush Creek Road.

02:36:29.160 --> 02:36:35.920
 So I was very surprised when I reviewed the agenda and related exhibits to see a new proposed

02:36:35.920 --> 02:36:39.080
 alignment of the Brush Creek extension.

02:36:39.080 --> 02:36:46.720
 The new alignment shown on the Sagebrook exhibit cuts off the northeast corner of our property,

02:36:46.720 --> 02:36:52.280
 of our residence, and places the roadway squarely through my husband's shop that he uses to

02:36:52.280 --> 02:36:54.600
 store his farming implements.

02:36:54.600 --> 02:37:00.000
 When I saw this, I called Mr. Jenkins immediately and received a voicemail message that he was

02:37:00.000 --> 02:37:02.240
 no longer with the City of Denton.

02:37:02.240 --> 02:37:05.320
 I called and emailed Ms. Zygarski.

02:37:05.320 --> 02:37:09.320
 She called me back promptly and informed me that the new alignment was made after the

02:37:09.320 --> 02:37:15.000
 feasibility study, and she provided various reasons from the study for the alignment.

02:37:15.000 --> 02:37:19.040
 The Brush Creek extension could have been placed anywhere on the proposed Sagebrook

02:37:19.040 --> 02:37:23.880
 development to avoid impact to our property, but unfortunately, it was not.

02:37:23.880 --> 02:37:28.600
 I see in the exhibits that there was a neighborhood meeting to discuss the development, but we

02:37:28.600 --> 02:37:30.720
 did not receive a notice.

02:37:30.720 --> 02:37:35.680
 The developer did not contact us specifically to discuss the roadway alignment and receive

02:37:35.680 --> 02:37:37.000
 our input.

02:37:37.000 --> 02:37:43.400
 Furthermore, we believe the decision on the alignment was made based on inaccurate information

02:37:43.400 --> 02:37:46.560
 related to a gas well that no longer exists.

02:37:46.560 --> 02:37:52.800
 Again, we oppose the zoning change request to allow more time to discuss the alignment

02:37:52.800 --> 02:37:58.000
 of the Brush Creek extension with the city and the developer and to verify the reasons

02:37:58.000 --> 02:38:09.720
 for the alignment by an engineer or qualified third party.

02:38:09.720 --> 02:38:17.560
 Thank you so much for calling in and being patient and holding to bring us that perspective

02:38:17.560 --> 02:38:18.560
 of your property.

02:38:18.560 --> 02:38:21.920
 Do we have any questions for...

02:38:21.920 --> 02:38:23.200
 Is it Dominguez?

02:38:23.200 --> 02:38:25.160
 Yes, Angela Dominguez.

02:38:25.160 --> 02:38:27.800
 Ms. Dominguez, do we have any questions for her?

02:38:27.800 --> 02:38:34.160
 Ms. Dominguez, I don't see any questions at this time, but I certainly appreciate you

02:38:34.160 --> 02:38:35.160
 calling in.

02:38:35.160 --> 02:38:37.320
 Just one second, Commissioner Beck.

02:38:37.320 --> 02:38:43.040
 This is not for Ms. Dominguez, but it is related to materials she brought up.

02:38:43.040 --> 02:38:46.560
 Thank you, Chair, by the way.

02:38:46.560 --> 02:38:53.920
 Maybe it's a question for the city and engineer, but can you educate us why we felt the Brush

02:38:53.920 --> 02:39:00.280
 Creek couldn't go through the gas well property region, especially considering it's being

02:39:00.280 --> 02:39:04.920
 disused now?

02:39:04.920 --> 02:39:06.520
 Anyone at city?

02:39:06.520 --> 02:39:10.760
 Yeah, I can attempt to answer that.

02:39:10.760 --> 02:39:13.920
 A lot of it is due to lack of information.

02:39:13.920 --> 02:39:19.360
 There's not a lot of studies or information out there regarding development over gas wells,

02:39:19.360 --> 02:39:22.480
 especially for something as dynamic as a roadway.

02:39:22.480 --> 02:39:27.280
 The well is capped at a fairly shallow distance below the surface in accordance with the Railroad

02:39:27.280 --> 02:39:33.600
 Commission standards, so there would be a potential need to reopen that well and do

02:39:33.600 --> 02:39:40.160
 whatever workover is necessary to adjust that for the paving and construction of the base

02:39:40.160 --> 02:39:42.680
 for the roadway.

02:39:42.680 --> 02:39:48.600
 In general, just due to the lack of knowledge of what really occurs when something is put

02:39:48.600 --> 02:39:55.720
 over a well over a long term and has the constant use of a well of a roadway, there was just

02:39:55.720 --> 02:39:59.800
 a lot of uncertainty on the city's part of not wanting to put that directly underneath

02:39:59.800 --> 02:40:05.200
 a very costly and highly anticipated Ush Road.

02:40:05.200 --> 02:40:11.120
 I don't know if there's anything else you want to add to that.

02:40:11.120 --> 02:40:17.480
 The only other that I would add is I think you hit it, Haley, when we touched on, I should

02:40:17.480 --> 02:40:22.880
 say, when you went through your presentation, it was sort of sandwiched between the flood

02:40:22.880 --> 02:40:27.840
 plain to the south, and so really it was to have the road kind of hug that flood plain

02:40:27.840 --> 02:40:32.920
 as much as possible for the continuity of the park trail so it can continue through.

02:40:32.920 --> 02:40:38.760
 But again, it was not any intention of the city to have a plugged gas well under any

02:40:38.760 --> 02:40:45.800
 even a local street, let alone a future six-lane arterial.

02:40:45.800 --> 02:40:50.200
 I guess if there's a lack of knowledge, that doesn't mean it's something that can't be

02:40:50.200 --> 02:40:51.200
 done.

02:40:51.200 --> 02:40:53.700
 It means that there's a concern, which I appreciate.

02:40:53.700 --> 02:41:04.360
 We should take cautions and concerns, that there's no standards for removal of gas lines,

02:41:04.360 --> 02:41:11.460
 plugging of things such that building can be done on top of these kinds of things.

02:41:11.460 --> 02:41:15.840
 Certainly this is not the only gas well in existence that's ever wanted to have development

02:41:15.840 --> 02:41:22.400
 near it.

02:41:22.400 --> 02:41:28.600
 I feel like the lack of information is insufficient to make a judgment on that.

02:41:28.600 --> 02:41:32.560
 Yeah, I understand that concern.

02:41:32.560 --> 02:41:37.120
 Staff has researched this topic extensively due to a council request that still hasn't

02:41:37.120 --> 02:41:40.280
 gone to a work session regarding plugged wells.

02:41:40.280 --> 02:41:45.880
 There are very limited studies nationwide regarding this topic.

02:41:45.880 --> 02:41:51.300
 Just speaking from experience with other projects where wells have been plugged, the plugging

02:41:51.300 --> 02:41:53.480
 is done in accordance with Railroad Commission standards.

02:41:53.480 --> 02:41:57.160
 It's typically about 10 feet below the surface where the well is capped.

02:41:57.160 --> 02:42:03.240
 It would be a significant process for anyone, the city or private developer, to adjust that

02:42:03.240 --> 02:42:04.240
 once the well is capped.

02:42:04.240 --> 02:42:09.360
 You would have to go in, remove all the casing and materials that were used to cap the well,

02:42:09.360 --> 02:42:14.720
 put the well off further below the surface, recap it, and then there's ultimately just

02:42:14.720 --> 02:42:20.180
 still the unknown of any potential hazards of that well casing cracking or anything like

02:42:20.180 --> 02:42:26.080
 that with the added pressure and activity above ground with a roadway above it.

02:42:26.080 --> 02:42:31.080
 I understand that, but when we do floodplains, when we do drainages, when we build next to

02:42:31.080 --> 02:42:39.840
 a lake, when we build next to any geological feature, there are risks that need to be mitigated

02:42:39.840 --> 02:42:43.840
 along with that, regardless of what that was.

02:42:43.840 --> 02:42:48.720
 Build next to a volcano, you've got to mitigate for the volcano.

02:42:48.720 --> 02:42:57.080
 The question I have is, those are risks that are associated with development by the developer

02:42:57.080 --> 02:43:05.200
 when they have a feature on their property that they wish to develop, and in concern

02:43:05.200 --> 02:43:09.760
 that we have a lack of knowledge that I said earlier.

02:43:09.760 --> 02:43:17.060
 I feel like we're being asked to make a decision about both for the mobility plan and for this

02:43:17.060 --> 02:43:24.200
 property and zoning, and they all impact where we have a lack of knowledge about future roadways,

02:43:24.200 --> 02:43:28.040
 and of course, that impacts all the surrounding properties.

02:43:28.040 --> 02:43:31.280
 Thank you, Commissioner Beck.

02:43:31.280 --> 02:43:32.280
 Commissioner Anderson?

02:43:32.280 --> 02:43:33.280
 Thank you, Chair.

02:43:33.280 --> 02:43:39.160
 I thought they spoke earlier that there was nothing going to be built over the cat well.

02:43:39.160 --> 02:43:40.800
 Is that correct?

02:43:40.800 --> 02:43:41.800
 Yes.

02:43:41.800 --> 02:43:48.880
 As part of the review process, staff indicated to the developer that we would not accept

02:43:48.880 --> 02:43:55.580
 the gas well being underneath the city street of any type, as Richard indicated, and although

02:43:55.580 --> 02:43:59.200
 we have no standards in the code, we asked the developer and they voluntarily complied

02:43:59.200 --> 02:44:03.460
 with our request to have that well situated on an open space lot so that nothing was built

02:44:03.460 --> 02:44:04.460
 over the top of it.

02:44:04.460 --> 02:44:05.460
 Thank you very much.

02:44:05.460 --> 02:44:12.080
 Commissioner Burnett, I want to get to you real quickly, is there any other questions

02:44:12.080 --> 02:44:19.800
 for the citizen, Ms. Dominguez, I'd like to do is if not, go ahead and close public comment,

02:44:19.800 --> 02:44:26.460
 move into discussion for the commission.

02:44:26.460 --> 02:44:33.200
 Seeing none, I'm going to go ahead and close the public hearing for this item and acknowledge

02:44:33.200 --> 02:44:35.400
 Commissioner Burnett.

02:44:35.400 --> 02:44:39.560
 My question was covered by Commissioner Anderson.

02:44:39.560 --> 02:44:52.980
 Mr. Smith, any motion to approve first for approval, Mr. Anderson, I'll second his motion.

02:44:52.980 --> 02:44:53.980
 Okay.

02:44:53.980 --> 02:44:54.980
 Any discussion on the item?

02:44:54.980 --> 02:44:57.160
 Christian or back.

02:44:57.160 --> 02:45:02.400
 So I, I actually had some additional discussion I'd like to ask the city before we go to the

02:45:02.400 --> 02:45:03.400
 motion if that's proper.

02:45:03.400 --> 02:45:11.440
 Yeah, and in fact, it's it's preference to have the motion on the table and then discuss

02:45:11.440 --> 02:45:12.440
 around that motion.

02:45:12.440 --> 02:45:14.200
 So you're you're good questioner back.

02:45:14.200 --> 02:45:15.200
 Okay.

02:45:15.200 --> 02:45:16.640
 Thank you, chair.

02:45:16.640 --> 02:45:24.920
 So I have a question about sort of Criterion for and that is the, the nearby consistency

02:45:24.920 --> 02:45:33.880
 Criterion, essentially, and that is what concerns me is that we are using, we use this development

02:45:33.880 --> 02:45:39.500
 the development north of the park, I forget the name of it, right south of the range along

02:45:39.500 --> 02:45:47.680
 the creek, as well as the PD to the southwest of this as justification for Hunter Cole.

02:45:47.680 --> 02:45:52.240
 And then we're using Hunter Cole as justification for these properties.

02:45:52.240 --> 02:45:58.600
 And and all four or five properties that I've just mentioned are well outside the general

02:45:58.600 --> 02:46:04.740
 bound they're in they're in the city, but they're outside the sort of consistent boundaries

02:46:04.740 --> 02:46:08.400
 of what we would call development in our city.

02:46:08.400 --> 02:46:15.200
 And so I feel like we're sort of forcing these into place and using recursively to justify

02:46:15.200 --> 02:46:16.400
 each other.

02:46:16.400 --> 02:46:22.280
 And and so I'm not at all convinced that we're meeting Criterion for and in the slightest.

02:46:22.280 --> 02:46:29.440
 And I'm also not convinced that we're meeting the Denton 2030 plan for centralized development

02:46:29.440 --> 02:46:36.680
 that again we're using we're using these external development opportunities to to try to justify

02:46:36.680 --> 02:46:40.240
 themselves in sort of a circular recursive nature.

02:46:40.240 --> 02:46:46.760
 And that doesn't it feel at all to me that we're being I think it's 2.4 maybe I forget

02:46:46.760 --> 02:46:48.720
 the exact chapter.

02:46:48.720 --> 02:46:57.480
 But we're we're the the subsection that that's governed the 2030 plan to sort of mitigate

02:46:57.480 --> 02:47:02.820
 sprawl and and keep our density in the central corridor or higher.

02:47:02.820 --> 02:47:08.880
 We discussed this at a number of different opportunities and so this this greatly concerns

02:47:08.880 --> 02:47:16.320
 me that we're promoting sprawl where we're not looking at development opportunities for

02:47:16.320 --> 02:47:22.320
 these for these guests are not the road through the gas wells and therefore we're impacting

02:47:22.320 --> 02:47:29.400
 other surrounding properties and and I and then you know the the information that was

02:47:29.400 --> 02:47:34.960
 brought up by some of our commentators about the fiscal impacts seem like they're they're

02:47:34.960 --> 02:47:37.460
 not at all completely justified.

02:47:37.460 --> 02:47:44.240
 So I'm I'm not at all I'm I'm not opposed to the the nature of the proposed plan for

02:47:44.240 --> 02:47:45.960
 this property were to go through.

02:47:45.960 --> 02:47:52.160
 I'm concerned that we are not meeting our criteria for our overall development goals

02:47:52.160 --> 02:47:59.800
 and and that's the great concern to me for this property and surrounding properties.

02:47:59.800 --> 02:48:08.920
 Thank you Mr. Beck I'm going to jump in and add kind of my thoughts on this.

02:48:08.920 --> 02:48:17.000
 I given that the there's a city park right north of this it seems to me a really unique

02:48:17.000 --> 02:48:21.400
 place to have a neighborhood next to the park a lot of our most cherished neighborhoods

02:48:21.400 --> 02:48:28.320
 and didn't in my my opinion are embedded in close parks whether that's Nettie Schultz

02:48:28.320 --> 02:48:33.960
 or Eureka or North Lakes those are I think some of our most desired neighborhoods in

02:48:33.960 --> 02:48:40.120
 town and so the idea of putting a neighborhood just south of this park and and embedding

02:48:40.120 --> 02:48:44.120
 it into a trail system is certainly of interest to me.

02:48:44.120 --> 02:48:48.520
 The only really concern I have is that I want to talk more about the mobility plan and and

02:48:48.520 --> 02:48:54.080
 maybe further acknowledge Mr. Mingus's concerns without speculating too much about my ignorance

02:48:54.080 --> 02:49:00.480
 and mobility was it not possible to for this property or for the mobility plan to bring

02:49:00.480 --> 02:49:06.240
 in Allred and Brush Creek further to the east and looking at it that s-curve for a six lane

02:49:06.240 --> 02:49:10.320
 road might have been tight and you might have been running to the same angle as Bonnie Bray

02:49:10.320 --> 02:49:15.640
 currently presents itself and so in my finite mind I'm thinking that's the reason we didn't

02:49:15.640 --> 02:49:22.040
 just do two right angles and cut this property right in half with a six lane or two or arterial

02:49:22.040 --> 02:49:26.280
 but I just want a confirmation that I know Haley said we're kind of thread the needle

02:49:26.280 --> 02:49:33.960
 between flood zone and the gassed the capped gas and just so I state this I'm not in favor

02:49:33.960 --> 02:49:39.320
 of putting a road over a capped gas I know I agree with Commissioner Beck that more information

02:49:39.320 --> 02:49:44.400
 is probably needed in that study but just innately that seems a little unstable but

02:49:44.400 --> 02:49:50.480
 nevertheless Haley mentioned threading the needle in between the the capped gas well

02:49:50.480 --> 02:49:57.720
 and the floodplain but there wasn't any mention on going east on the property closer to the

02:49:57.720 --> 02:50:02.240
 park and maybe they don't want to city has one a six lane road next to the park I'm just

02:50:02.240 --> 02:50:09.280
 trying to understand why an eastern route was not part of the finalized mobility plan

02:50:09.280 --> 02:50:14.440
 any insight staff could give on that would be appreciated.

02:50:14.440 --> 02:50:21.160
 Yeah I think you touched on a lot of the reasons for that as the the citizen referenced when

02:50:21.160 --> 02:50:27.040
 the city when the city initiated this feasibility study they looked at I believe six or seven

02:50:27.040 --> 02:50:31.640
 options probably I think it was like options A through H for potential alignments for this

02:50:31.640 --> 02:50:38.440
 roadway they're looking at all of those factors the topography of the land you know with that

02:50:38.440 --> 02:50:43.800
 significant fall was part of that as well as like I said avoidance of the floodplain

02:50:43.800 --> 02:50:48.040
 and the gas well I think you're exactly right on the eastern part of the property that those

02:50:48.040 --> 02:50:53.840
 angles between the railroad and hitting all red would have been a bit sharper than what

02:50:53.840 --> 02:50:59.400
 are allowed for a road of this type that would have this potential speed on it but I know

02:50:59.400 --> 02:51:04.240
 that study was reviewed extensively by our engineering staff as well as with the City

02:51:04.240 --> 02:51:09.640
 Council before an alignment was was eventually settled on this developer as they mentioned

02:51:09.640 --> 02:51:15.480
 has been working with us since 2018 at some point so they've been involved in those discussions

02:51:15.480 --> 02:51:20.840
 and and ultimately it was determined that this roadway in the alignment that they proposed

02:51:20.840 --> 02:51:26.120
 was was the best deal that we could get to get this road across you know with all the

02:51:26.120 --> 02:51:34.080
 challenges involved sure that was my my assumptions but I wanted to clarify it this project makes

02:51:34.080 --> 02:51:40.000
 a lot of sense to me I think it's a high quality project that is needed or at least a desired

02:51:40.000 --> 02:51:48.120
 project south of town however it certainly gives me some pause seeing that the the plan

02:51:48.120 --> 02:51:53.440
 provided in the deck we saw tonight shows a potential road going right into Mr. Mingus

02:51:53.440 --> 02:51:58.160
 said a shop looks kind of a house is a big structure and so I just want to be sensitive

02:51:58.160 --> 02:52:05.560
 to the decision we make tonight potentially is going to put a homeowner in a really undesirable

02:52:05.560 --> 02:52:10.760
 position as she stated herself so I just wanted to clarify and ensure that when we think about

02:52:10.760 --> 02:52:16.200
 the extension of mobility in our city we're thinking about all assets to ensure that we're

02:52:16.200 --> 02:52:22.360
 not displacing citizens unnecessarily if there's another option and so Haley I appreciate you

02:52:22.360 --> 02:52:28.600
 confirming some of my assumptions and trying to look at this road from a different angle

02:52:28.600 --> 02:52:34.200
 Commissioner Ellis I'll turn to you thank you chair and thank you for bringing up this further

02:52:34.200 --> 02:52:42.760
 discussion on this when again was the feasibility study done I believe it was started last summer

02:52:42.760 --> 02:52:49.960
 I think the letters to property owners went out in July of 2019 and I don't know more

02:52:49.960 --> 02:52:53.820
 specifically on that I was looking to Richard to see if he had a better date as to to when

02:52:53.820 --> 02:53:00.520
 that wrapped up I don't recall the exact date that it that it wrapped up but there was a

02:53:00.520 --> 02:53:07.920
 work session that was done at City Council on February 11th part of that work session

02:53:07.920 --> 02:53:15.720
 one of the main discussions was that alignment for the east west there were a number of alternatives

02:53:15.720 --> 02:53:21.920
 that were presented I don't have the ability to pull the presentation up right now but

02:53:21.920 --> 02:53:28.400
 I want to say they looked at four different alignment options and so again this is this

02:53:28.400 --> 02:53:36.680
 is looking at connecting this from 35w all the way over to 2499 so this will connect

02:53:36.680 --> 02:53:44.720
 into Hickory Creek and so I think it has an estimated daily trips 2045 of 15 I think it

02:53:44.720 --> 02:53:52.080
 was 15,000 vehicles which is a substantial increase from today but there are there they

02:53:52.080 --> 02:54:03.760
 went through a number of alignments as associated with that and so it I believe it was discussed

02:54:03.760 --> 02:54:10.560
 you believe what was discussed the the alignment as it's presented okay so do you know that

02:54:10.560 --> 02:54:16.860
 in that study if to chairs point was it ever discussed to bring that alignment into this

02:54:16.860 --> 02:54:21.480
 property that we are discussing I think it maybe step back a little bit and think about

02:54:21.480 --> 02:54:27.560
 what a what the feasibility analysis is all it does is just shows a straight line so it

02:54:27.560 --> 02:54:33.000
 doesn't necessarily give a direct route there's no engineering it's just hey we've got a six

02:54:33.000 --> 02:54:38.480
 lane road what are the major obstacles that we have to overcome to bring this road through

02:54:38.480 --> 02:54:43.960
 and so that's really that's really kind of how it said how it really framed it and then

02:54:43.960 --> 02:54:48.780
 like anything and until development comes in we really start looking at how it how it

02:54:48.780 --> 02:54:53.520
 how it starts to shape up and so through the conclusion or through the not even the conclusion

02:54:53.520 --> 02:54:58.560
 but as that was being developed this project came in and obviously we've been working through

02:54:58.560 --> 02:55:03.840
 and they could probably attest to this this alignment as well as a number of other issues

02:55:03.840 --> 02:55:08.600
 that we ultimately work through to get to where we are today but that's that's where

02:55:08.600 --> 02:55:14.760
 it was essentially what staff agreed to as the best location long term for that for that

02:55:14.760 --> 02:55:20.360
 six lane road and I mean I agree that it's certainly will be an asset when that road

02:55:20.360 --> 02:55:28.400
 is in I do hate impacting a property owner the way that it appears we are they're losing

02:55:28.400 --> 02:55:36.920
 a sizable and I mean usable sizable expensive structure and while I understand them in a

02:55:36.920 --> 02:55:45.360
 domain and all of that will be worked out it's it still impacts them their life which

02:55:45.360 --> 02:55:46.360
 is concerning

02:55:46.360 --> 02:56:02.000
 Mr. Anderson could I rescind my second after looking at this map I'm starting to understand

02:56:02.000 --> 02:56:07.840
 I I was just looking at the the square of the properties but now I do see what Mr. Mingus

02:56:07.840 --> 02:56:15.240
 is talking about and to Commissioner Ellis's point I mean they're going to lose a substantial

02:56:15.240 --> 02:56:22.780
 northeastern part of their property and I don't know if this is something that the developer

02:56:22.780 --> 02:56:28.600
 could rethink about turning it back to the north earlier than going through their property

02:56:28.600 --> 02:56:33.120
 like you discussed to go east of the well somehow but I mean I know they're going to

02:56:33.120 --> 02:56:38.680
 lose some you know lots that they can sell for property but but you got to think of the

02:56:38.680 --> 02:56:43.800
 neighbors and you got to be cognizant of their you know their well-being as well and that's

02:56:43.800 --> 02:56:47.440
 something after looking at this a little bit more in detail that of the points you guys

02:56:47.440 --> 02:56:55.400
 brought up you commissioners brought up I do see and that it would be a drastic chunk

02:56:55.400 --> 02:57:01.080
 of their property and you know I'd like to rescind my second until I hear more that that's

02:57:01.080 --> 02:57:08.860
 okay yeah I definitely can Christian Smith Haley can you remind me on PD's the plenary

02:57:08.860 --> 02:57:14.120
 plot there's be a plenary file with the PD right and then that has some binding natures

02:57:14.120 --> 02:57:20.700
 to it correct the conceptual plans that you're tonight yeah those would be tied to the ordinance

02:57:20.700 --> 02:57:25.680
 all of the exhibits provided in your backup the you know the concept landscape plans all

02:57:25.680 --> 02:57:32.120
 of that go as part of the ordinance we had a we had a case Jim strange had brought up

02:57:32.120 --> 02:57:38.860
 it was gosh it was called a bridge ridge month or something like that over there off of Ryan

02:57:38.860 --> 02:57:44.000
 Road where same deal concerns from them from the neighborhoods to south of the property

02:57:44.000 --> 02:57:52.080
 that it was a plan development that they worked out a changing of the conceptual plan to make

02:57:52.080 --> 02:57:57.760
 that work with traffic for that neighborhood between us and planning and us in City Council

02:57:57.760 --> 02:58:05.920
 I don't know how I'm going to navigate this via zoom but but have how much how much work

02:58:05.920 --> 02:58:12.720
 if it has been discussed about trying to avoid this this property and then maybe I can point

02:58:12.720 --> 02:58:20.720
 this that question maybe to to Randy and your staff down there Randy about you know how

02:58:20.720 --> 02:58:24.160
 you guys built that out in that conceptual plan and how much work can be done to be able

02:58:24.160 --> 02:58:29.600
 to move that road around I get the concerns but I don't know how much how much leeway

02:58:29.600 --> 02:58:34.400
 we can give right now to be able to move that that road during the the conceptual plan inside

02:58:34.400 --> 02:58:45.680
 the PD that could definitely be an option it the PD you reference they did rearrange

02:58:45.680 --> 02:58:49.400
 the the street configuration and presented a second option to City Council that ultimately

02:58:49.400 --> 02:58:53.600
 got approved I think that would be a little more significant impact on this development

02:58:53.600 --> 02:58:58.960
 given the the hundred and twenty feet of width for that right of way during initial discussions

02:58:58.960 --> 02:59:04.200
 we we did discuss with them some some other alignments that can find it within their property

02:59:04.200 --> 02:59:09.560
 which is what they can the you know schematic line on the mobility plan originally showed

02:59:09.560 --> 02:59:14.040
 but ultimately like Richard said this this worked out to be the most feasible option

02:59:14.040 --> 02:59:19.760
 for that street that we could see through about a year and a half or so of working with

02:59:19.760 --> 02:59:24.480
 them and our engineering staff but at this point you know I can definitely let Randy

02:59:24.480 --> 02:59:29.600
 and her team address the impact that that would have on them the only thing I would

02:59:29.600 --> 02:59:34.160
 add I think it's also important to note that well I don't believe they set the design speed

02:59:34.160 --> 02:59:40.920
 for this road typically six lane arterials are at least 45 to 50 miles an hour and so

02:59:40.920 --> 02:59:48.080
 those those curves for the road or those turns have to be within a certain within a certain

02:59:48.080 --> 02:59:54.080
 geometry so I'm I'm not sure if that hard if a hard right or a hard bend to go north

02:59:54.080 --> 02:59:59.880
 to go east of that well could be possible then to realign back up with with all red

02:59:59.880 --> 03:00:06.160
 to that existing road but so there's there's also a number of other factors to look at

03:00:06.160 --> 03:00:11.960
 yeah my concern is one we have an outstanding motion without a second I don't I want to

03:00:11.960 --> 03:00:20.960
 make sure we wrap that up the two it does seem it most likely that the mobility plan

03:00:20.960 --> 03:00:27.040
 is going to have that road go through that property if it cannot go over a well or and

03:00:27.040 --> 03:00:33.360
 it can't go to the east and so even if we we don't approve this particular item that

03:00:33.360 --> 03:00:38.120
 doesn't necessarily protect the homeowner because 100 coal come in that six lane arterial

03:00:38.120 --> 03:00:45.680
 it's it's going to happen and so the the understanding that the feasibility and the engineers found

03:00:45.680 --> 03:00:52.120
 it fit and I trust our city staff that it needs to go the direction they found it makes

03:00:52.120 --> 03:00:58.880
 me inclined to to support this project because it's a sound project they've done years worth

03:00:58.880 --> 03:01:08.680
 of work on it and and I don't I don't see that if the road going there is is a a foregone

03:01:08.680 --> 03:01:13.680
 conclusion to to deny a project before I open for more discussion commissioner Smith you

03:01:13.680 --> 03:01:22.680
 had the motion on the table is there a second for the motion I will second it so we have

03:01:22.680 --> 03:01:29.520
 a first and a second for approval commissioner back thank you chair so I guess following

03:01:29.520 --> 03:01:36.720
 directly on your comments I mean if we had Haley mentioned and Richard mentioned some

03:01:36.720 --> 03:01:42.520
 some other plans and I'm not second guessing our engineers either I would like to see maybe

03:01:42.520 --> 03:01:48.040
 what were the impacts of those so you can rank sort a series of plans and and say well

03:01:48.040 --> 03:01:53.360
 we think this is the best one but if the top three are not that different in terms of impact

03:01:53.360 --> 03:01:59.160
 then and three has I'm just making things up now hypothetically and number three moves

03:01:59.160 --> 03:02:06.480
 to the east and costs plat developments in the property but saves the Dominguez property

03:02:06.480 --> 03:02:13.540
 for the mobility plan I'd like to see those options before I personally would feel comfortable

03:02:13.540 --> 03:02:18.520
 voting through and I'd also like to see you know more of the you know I agree with you

03:02:18.520 --> 03:02:24.560
 that you don't want to build a road on top of a an engineered structure underground but

03:02:24.560 --> 03:02:29.160
 at the same token I'd like to see some of the results of that before I felt comfortable

03:02:29.160 --> 03:02:34.300
 saying yep we should definitely punch through the Dominguez property and make this happen

03:02:34.300 --> 03:02:39.160
 I just don't feel comfortable doing either one of those thank you Richard did you have

03:02:39.160 --> 03:02:44.760
 something to say yeah where I'm trying to we're trying to pull in pre tam Deshmukh our deputy

03:02:44.760 --> 03:02:49.200
 director of engineering so he can provide some more insight with respect to the to the

03:02:49.200 --> 03:02:53.280
 alignment if you'll just bear with me absolutely that would be worth the wait commissioner

03:02:53.280 --> 03:03:00.920
 Ellis thank you chair do we have the applicant still here did she want to add anything to

03:03:00.920 --> 03:03:17.480
 this discussion hello this is Doug Powell with McAdams I've I'm a planner is Randy Doug

03:03:17.480 --> 03:03:24.960
 you there yes okay my name is that's why my name is Doug Powell I'm a planner but we have

03:03:24.960 --> 03:03:30.240
 a background in transportation planning and Richards Wright what happens if you move the

03:03:30.240 --> 03:03:38.880
 road to the east then you have to curve it back at the south so you have an s curve and

03:03:38.880 --> 03:03:46.200
 because you can't bring that that roadway into the railroad crossing you have to have

03:03:46.200 --> 03:03:56.120
 a straightaway so if you look at the map you can't get back up into the west two curves

03:03:56.120 --> 03:04:00.640
 right now we've got a gentle curve and a and a kind of a sharper one off the property but

03:04:00.640 --> 03:04:08.600
 you can't put two curves it'd be an s curve and I don't think it would work and especially

03:04:08.600 --> 03:04:16.920
 given that it's there to carry traffic with the speeds Richard was was mentioning it just

03:04:16.920 --> 03:04:30.640
 doesn't make make sense I appreciate you Doug weighing in on that I like I said I in my

03:04:30.640 --> 03:04:37.800
 limited scope it seems like that's a that's a tough move it's not a lot of space there

03:04:37.800 --> 03:04:57.120
 we are currently waiting to see if our engineers city engineer is able to speak just one moment

03:04:57.120 --> 03:05:00.640
 sure would it help if we pulled the if we brought the PowerPoint presentation back up

03:05:00.640 --> 03:05:06.440
 to show that alignment would that help with the discussion certainly I don't know who

03:05:06.440 --> 03:05:11.400
 has it pulled up or or not I have it in front of me but yeah we can pull it up to have a

03:05:11.400 --> 03:05:39.080
 shared screen so at least be great Richard can you confirm this conceptual plan shows

03:05:39.080 --> 03:05:44.000
 the full hundred and twenty feet right away that's represented to scale of the right away

03:05:44.000 --> 03:05:55.120
 needed for the road it does okay so if we were to conceptually try to bend that road

03:05:55.120 --> 03:06:16.960
 we'd use that same kind of width correct okay sure Chris are back so looking at the layout

03:06:16.960 --> 03:06:23.600
 that that Richard has on the screen is one of the concerns that they're trying to keep

03:06:23.600 --> 03:06:28.840
 the central corridor and I understand that's a it's a fundamental feature of the development

03:06:28.840 --> 03:06:35.800
 but if they're trying to keep the central north-south corridor no I don't think is

03:06:35.800 --> 03:06:39.880
 that correct no I mean I think an s-curve would completely change their development

03:06:39.880 --> 03:06:45.800
 I think the concern now is if given where all right is east to west and where brush

03:06:45.800 --> 03:06:51.920
 creek comes in can you get a hundred and twenty foot right away with two different radiuses

03:06:51.920 --> 03:07:00.680
 or radii at a 50 mile per hour speed on on the height or the depth rather of this property

03:07:00.680 --> 03:07:07.920
 can can you have a a 90 and a 90 degree turn on a on a six lane arterial I don't think

03:07:07.920 --> 03:07:13.920
 so it can 245 fit I think that's the question is regardless of their conception if I would

03:07:13.920 --> 03:07:17.960
 imagine if all red becomes an s-curve through their property their entire conceptual plan

03:07:17.960 --> 03:07:23.680
 needs to be started a hundred percent over we're just looking at the feasibility in general

03:07:23.680 --> 03:07:29.520
 of being able to move future brush creek extension to cut through their property because I think

03:07:29.520 --> 03:07:35.440
 the the the presentation from Haley suggests that based on the mobility plan the current

03:07:35.440 --> 03:07:54.320
 location of the road is the only location for the road

03:07:54.320 --> 03:08:01.040
 I believe pre-tem is available oh fantastic pre-tem if you can hear me and if you're unmuted

03:08:01.040 --> 03:08:11.800
 I can you are you aware of the question being proposed or can I restate that to you I am

03:08:11.800 --> 03:08:18.000
 this pre-tem deputy city engineer I'm I'm not sure if I heard your question completely

03:08:18.000 --> 03:08:25.840
 I've just got into the last of it and I was muted I think I'm unmuted at this point you

03:08:25.840 --> 03:08:32.480
 are the question I think that the that all the commissioners has is the rationale or

03:08:32.480 --> 03:08:41.320
 the the logic behind putting the brush creek expansion or extension road where it currently

03:08:41.320 --> 03:08:48.520
 is rather than trying to have brush creek and all red meet more to the east we're wanting

03:08:48.520 --> 03:08:56.600
 to know if it's possible that the future brush creek extension be moved at all or if it is

03:08:56.600 --> 03:09:07.400
 where it has to be typically I think I think typically when a site is designed there are

03:09:07.400 --> 03:09:15.240
 places that you definitely look for an ideal location one of the features for this particular

03:09:15.240 --> 03:09:22.000
 road was to extend and continue the trail system through the existing floodplain that

03:09:22.000 --> 03:09:29.080
 was one of the consideration that was taken into account we have a continuous trail extending

03:09:29.080 --> 03:09:36.960
 on the rest of the hickory creek alignment all the way it connects back into some of

03:09:36.960 --> 03:09:46.000
 the existing trails along hickory creek near the elementary school back there I want to

03:09:46.000 --> 03:09:56.040
 say that this design was based on the way the profile is the drainage plans and the

03:09:56.040 --> 03:10:05.040
 grading as well as the slopes and everything associated with this typically what happens

03:10:05.040 --> 03:10:11.000
 there are a couple things when we get into getting into the nitty-gritty of design and

03:10:11.000 --> 03:10:16.000
 getting into the weeds of it it's slightly different than where you're conceptually planning

03:10:16.000 --> 03:10:23.600
 stuff conceptually you can draw lines on mobility plans as well as some other plans but when

03:10:23.600 --> 03:10:33.240
 you actually get into the design component you want it to be at a location where it couple

03:10:33.240 --> 03:10:38.400
 things safety is important when you lay these roads out you have a community that split

03:10:38.400 --> 03:10:47.800
 and a six lane arterial goes through the community crossings and having an access to trail system

03:10:47.800 --> 03:10:55.840
 and all that becomes an issue can it be done can it be laid differently within the site

03:10:55.840 --> 03:11:05.680
 absolutely I mean we can engineer everything there are issues with the back to back s curve

03:11:05.680 --> 03:11:14.520
 that may be of concern you have a gas site on the north with the little red area between

03:11:14.520 --> 03:11:25.040
 that and the 90 degree connection to go over the railroad and connected 377 that may be

03:11:25.040 --> 03:11:30.120
 an issue typically that's another concern safety wise when you're traveling at those

03:11:30.120 --> 03:11:39.980
 speeds you do not want curves in your layout so you'd rather lay roadway segments as much

03:11:39.980 --> 03:11:47.840
 as you can plan them and lay them that they have minimal curves and extensions just in

03:11:47.840 --> 03:11:55.040
 the future I mean it's basically planning you plan the best safety alternative so can

03:11:55.040 --> 03:12:01.720
 we look into options going through back to back s curves ideally not recommended in this

03:12:01.720 --> 03:12:09.120
 side because it's very close but can we engineer it we can safety wise not a better option

03:12:09.120 --> 03:12:18.760
 than what's going to aid I hope that covers well I appreciate you hopping on and providing

03:12:18.760 --> 03:12:26.480
 that context and let's see if any commissioners have any questions for you commissioner beck

03:12:26.480 --> 03:12:34.040
 yeah so I'm there's some vagueness in the language and I and I appreciate that you're

03:12:34.040 --> 03:12:38.960
 trying to provide options but I guess one of my questions is and it seems like some

03:12:38.960 --> 03:12:43.440
 of the other commissioners have some of the same questions is is it something that can

03:12:43.440 --> 03:12:55.480
 be done and meet code and therefore mitigate potential property issues on the west or is

03:12:55.480 --> 03:13:04.120
 it you know something that that absolutely cannot be done by safety code yes it can be

03:13:04.120 --> 03:13:13.120
 done we can engineer a different alignment it may be expensive it may be it may create

03:13:13.120 --> 03:13:20.400
 issues related to safety that we have to mitigate at a later date and then as far as the way

03:13:20.400 --> 03:13:26.080
 it goes and connects on the other side of the property at this point that connection

03:13:26.080 --> 03:13:33.500
 and alignment is just in the plans we do not have any plans to extend or have this built

03:13:33.500 --> 03:13:41.680
 anytime in the near future it is purely as properties come up as parcels develop we continue

03:13:41.680 --> 03:13:50.900
 to make sure that we create an alignment that is least encroaching as well as we work with

03:13:50.900 --> 03:13:56.240
 different parcels so yes engineering wise to answer your question we can definitely

03:13:56.240 --> 03:14:05.680
 engineer it as far as safety and other concerns that will pop up as a result the new design

03:14:05.680 --> 03:14:11.200
 we currently don't know we've not explored that option so and can I follow that up with

03:14:11.200 --> 03:14:16.000
 can you you may not know the answer to that and that'd be perfectly fine but can you enlighten

03:14:16.000 --> 03:14:22.800
 us as to the issues that we brought up earlier that you may not have heard of of can you

03:14:22.800 --> 03:14:35.400
 retrofit a capped gas well to put a road open um engineering wise you can engineer anything

03:14:35.400 --> 03:14:43.080
 it's the amount of money and the physics it's a benefit cost analysis that has to be run

03:14:43.080 --> 03:14:51.800
 so what how much are we going to spend in order to have a roadway laid in safely and

03:14:51.800 --> 03:15:02.200
 which is a public facility so yes we have to if we have to explore the option it may

03:15:02.200 --> 03:15:11.600
 be that that might be an expensive alternative but it's something that is potentially feasible

03:15:11.600 --> 03:15:22.320
 if if the source of money were to come into play it's not something that's forbidden or

03:15:22.320 --> 03:15:29.840
 against rules or guidelines it's more of an yeah at this point I mean this is the last

03:15:29.840 --> 03:15:34.040
 minute question but there are two materials I'm not really familiar with that particular

03:15:34.040 --> 03:15:40.560
 site so I'm not sure if I can be specific and say yes this is a great thing or the yes

03:15:40.560 --> 03:15:48.160
 I can do it we definitely have to get into the details of it I can't really answer that

03:15:48.160 --> 03:16:00.080
 question a yes or no at this time okay thank you so any other questions for pre-tim or

03:16:00.080 --> 03:16:17.600
 staff we do have a motion and a second but I want to make sure all discussion all right

03:16:17.600 --> 03:16:24.160
 seeing no discussion I will call for oh Commissioner Ellis sorry about that thank you chair I believe

03:16:24.160 --> 03:16:31.960
 Commissioner Cole had his hand up Commissioner Cole thank you yeah do we know if that what

03:16:31.960 --> 03:16:41.360
 particular kind of well that is is that a horizontal or a vertical I am not entirely

03:16:41.360 --> 03:16:45.320
 sure I believe it's old enough that it was most likely just a vertical well rather than

03:16:45.320 --> 03:16:56.600
 a horizontal I can look into that more with the Railroad Commission Trisha Ellis thank

03:16:56.600 --> 03:17:00.720
 you chair I guess just a couple of thoughts here I'm really struggling here because I

03:17:00.720 --> 03:17:08.680
 really like this development but I don't like that we're being forced to we've got some

03:17:08.680 --> 03:17:13.760
 things on the answer with what was brought up today with this future alignment so it's

03:17:13.760 --> 03:17:19.480
 like if we vote on this project that's effectively saying we're going to align this road like

03:17:19.480 --> 03:17:27.280
 that and pre-tim said there are possible other alternatives possible I just don't like throwing

03:17:27.280 --> 03:17:30.760
 this property owner is like the sacrificial lamb for this development and that's what

03:17:30.760 --> 03:17:38.160
 it feels like to me so that's where my struggle is I don't know if anybody would be up for

03:17:38.160 --> 03:17:42.800
 postponing if the applicant would be up to postponing just to get a little bit more clarity

03:17:42.800 --> 03:17:50.080
 on some of the things that were brought up today that was just share my thoughts thank

03:17:50.080 --> 03:17:57.040
 you Mr. Ellis I think in response to those comments I I certainly without any lack of

03:17:57.040 --> 03:18:04.920
 gravity to miss Dominguez and her family understand that impact but in the same vein we just approved

03:18:04.920 --> 03:18:12.760
 a hundred foot cell tower in someone's backyard off University a lot of the decisions we have

03:18:12.760 --> 03:18:19.640
 do isolate one individual and potentially put them at a disadvantage or or changes their

03:18:19.640 --> 03:18:25.880
 enjoyment of their property for for me the brush Creek and all red represent a southern

03:18:25.880 --> 03:18:29.480
 road for our city that's eventually going to connect east and west all the way over

03:18:29.480 --> 03:18:36.960
 to Hickory Creek through coal ranch and hunter ranch and the idea of adding an s curve or

03:18:36.960 --> 03:18:43.200
 45s to a 50 mile power road makes me think of 1830 right at Hickory Creek in between

03:18:43.200 --> 03:18:47.840
 brush Creek now and just because we can engineer anything which I trust pretends to be able

03:18:47.840 --> 03:18:52.400
 to engineer anything the the mobility impact the safety impact the bifurcation of a neighborhood

03:18:52.400 --> 03:18:58.520
 the impact of trails put it right next to the brand new park I I believe that the road

03:18:58.520 --> 03:19:05.000
 given all the information that I've been provided is in is in the correct place it's where that

03:19:05.000 --> 03:19:11.200
 mobility is the best connector and it does appear that it doesn't imminently put miss

03:19:11.200 --> 03:19:18.040
 Dominguez's family at at at any kind of disposition it's going to be years decades before that

03:19:18.040 --> 03:19:24.640
 road even extends into the property which is a small concession I'll concede that but

03:19:24.640 --> 03:19:29.720
 nevertheless it's it's not and within a year that her shop or her property is going to

03:19:29.720 --> 03:19:35.080
 be impacted a lot of hands up I want to go I think I saw Commissioner Anderson first

03:19:35.080 --> 03:19:41.440
 uh the staff know thank you chair first uh but does the staff know or is Mr Dominguez

03:19:41.440 --> 03:19:47.640
 still on the phone how many acres we're looking at you know taking from the family because

03:19:47.640 --> 03:19:53.200
 if they if they own 100 acres right there and we're only taking three that's not I don't

03:19:53.200 --> 03:19:57.880
 see a big issue with that but if they own three uh five acres and we're taking two and

03:19:57.880 --> 03:20:02.440
 a half I mean I could see a big impact there but I didn't know staff knew how many acres

03:20:02.440 --> 03:20:14.680
 that we would be uh taken to build the road

03:20:14.680 --> 03:20:36.280
 I'm going to just try to give a rough rough estimate if you let me just

03:20:36.280 --> 03:20:40.640
 I mean I agree with chair this is it's going to be years down the road before we see a

03:20:40.640 --> 03:20:48.880
 major impact but I just just percentages for me it's just you know if we're taking the

03:20:48.880 --> 03:20:52.560
 majority of the property I'd you know I feel horrible but if we're only taking a small

03:20:52.560 --> 03:21:07.520
 percentage or something to you know to do this um so I just did a just a quick uh calculation

03:21:07.520 --> 03:21:15.440
 or or a polygon of a rectangle it's roughly 300 feet uh maybe Haley if you can pull that

03:21:15.440 --> 03:21:30.400
 back up it'll at least give some context so from the corner of their the northeast corner

03:21:30.400 --> 03:21:40.120
 of their property if you go over about 300 feet um which is uh approximately right where

03:21:40.120 --> 03:21:48.480
 the road starts where it kind of tees in we're all red tees in and then down about 630 feet

03:21:48.480 --> 03:21:58.240
 is about uh four and a quarter acres but do we know how much they own I mean I mean it's

03:21:58.240 --> 03:22:04.080
 she had stated earlier I thought it was a 96 acres okay all right I thought that's what

03:22:04.080 --> 03:22:15.000
 she said okay thanks rich uh the next hand I saw was Christa back so so one of the things

03:22:15.000 --> 03:22:24.160
 that concerns me about this is um the development costs maybe should be explored by the developers

03:22:24.160 --> 03:22:34.120
 um but also I'm concerned by um have we so two questions have we explored a potential

03:22:34.120 --> 03:22:40.520
 pathway through the other surrounding properties um to commissioner Ellis's or Anderson's

03:22:40.520 --> 03:22:49.560
 uh point um if we take less of a of a piece of the Dominguez property and and and explore

03:22:49.560 --> 03:22:55.960
 the properties to the north a little bit uh you know sacrifice a corner of the park whatever

03:22:55.960 --> 03:23:03.200
 then you have a potential uh uh shared impact as it were from from moving the potential

03:23:03.200 --> 03:23:09.080
 road around um the other thing that that so I'll bring them both up because I think they're

03:23:09.080 --> 03:23:13.960
 related the other question I have is related to chair's comment and that is um we're talking

03:23:13.960 --> 03:23:17.400
 about splitting a neighborhood we're talking about splitting a neighborhood if you want

03:23:17.400 --> 03:23:22.320
 to develop homes on both sides of the neighborhood if you say that I want to expand the trail

03:23:22.320 --> 03:23:28.220
 and park system to the southwest by moving the road to the east and have instead of whatever

03:23:28.220 --> 03:23:37.220
 150 homes I am going to have 120 homes uh then again that's that's a cost born as risk

03:23:37.220 --> 03:23:41.680
 and risk abatement by the developers uh not by the city and not by the surrounding property

03:23:41.680 --> 03:23:51.800
 owners so I guess the first question is have we explored the potential for uh other roots

03:23:51.800 --> 03:23:57.520
 and other pieces of property

03:23:57.520 --> 03:24:00.640
 commissioner Ellis I wanted to circle back to you real fast one commissioner was that

03:24:00.640 --> 03:24:06.480
 a question or is that a kind of the question is staff okay I'll let them answer yeah and

03:24:06.480 --> 03:24:10.280
 I don't know if pre-temp still on the call but I think that that was part of that analysis

03:24:10.280 --> 03:24:15.400
 they did when they looked at four or five different alignments but again a lot of that

03:24:15.400 --> 03:24:21.860
 ties to that crossing and aligning it with brush creek okay thank you I can I can jump

03:24:21.860 --> 03:24:29.240
 in I have a quick couple sentences we looked at we started with actually during the feasibility

03:24:29.240 --> 03:24:35.580
 study it's very preliminary planning level we started with close to 13 alternatives and

03:24:35.580 --> 03:24:49.560
 we dwindled down on different levels for feasibility primarily focusing on the terrain the constraints

03:24:49.560 --> 03:24:56.600
 floodplain was one of the main one and the constraints and then also looked at the most

03:24:56.600 --> 03:25:01.840
 direct route if you have a circuitous route that goes different angles and goes further

03:25:01.840 --> 03:25:09.240
 away and swings away people are most likely not going to use that so in order to have

03:25:09.240 --> 03:25:15.840
 something that is an arterial level six lane divided you need to have a most direct route

03:25:15.840 --> 03:25:24.280
 and I think we out of all those alternatives this was one of the alignment that was pretty

03:25:24.280 --> 03:25:36.400
 much distilled down to thank you commissioner Alice I want to follow back up with you I

03:25:36.400 --> 03:25:41.280
 don't know if your hand is up or not you had mentioned about looking to postpone were you

03:25:41.280 --> 03:25:45.080
 interested in making a subsidiary motion or were you just kind of thrown it out seeing

03:25:45.080 --> 03:25:52.360
 if someone else was doing I just wanted to respect that comment well I was trying I was

03:25:52.360 --> 03:26:00.520
 trying to get possibly thoughts from the applicant on that and other commissioners thoughts but

03:26:00.520 --> 03:26:07.440
 I mean the issue is is I'm not an engineer but good points have been brought up tonight

03:26:07.440 --> 03:26:16.840
 that we can't get answered tonight I don't understand deciding to necessarily line a

03:26:16.840 --> 03:26:24.340
 road right through a developed piece of someone's property when we had vacant land I understand

03:26:24.340 --> 03:26:29.560
 we're discussing a project on it now but we did have vacant land and it just seems odd

03:26:29.560 --> 03:26:36.440
 that we didn't and again I haven't seen the study that we didn't that wasn't part of our

03:26:36.440 --> 03:26:40.960
 backup or anything here it's just good points have been brought brought up that we can't

03:26:40.960 --> 03:26:49.520
 get answered and so I'm I would have a really hard time supporting this without getting

03:26:49.520 --> 03:27:01.000
 some of that answered so I guess at this point I will make a motion to postpone to the next

03:27:01.000 --> 03:27:05.320
 I'm not sure when our next PNZ meeting is in the world we're living in but to the next

03:27:05.320 --> 03:27:15.260
 PNZ meeting we have a motion to postpone to a date certain of next PNZ meeting I will

03:27:15.260 --> 03:27:24.480
 let Richard pop quiz tell us that date Mr. Cole I saw your hand yeah second that okay

03:27:24.480 --> 03:27:29.480
 the next the sorry the next meeting would be May 20th I just want to make sure we have

03:27:29.480 --> 03:27:37.960
 enough time to look at what what we're being asked to look at that gives us about a one

03:27:37.960 --> 03:27:44.960
 week to turn it or to turn everything around and specifically Commissioner Ellis and other

03:27:44.960 --> 03:27:49.720
 commissioners is the main request to maybe look at those 13 different alternatives that

03:27:49.720 --> 03:27:54.320
 engineering came up with and understand the rationale it seems like that would be probably

03:27:54.320 --> 03:27:59.560
 the most helpful thing to review it would be very helpful to I would like that too yeah

03:27:59.560 --> 03:28:05.440
 to understand why I mean the structure is on the property and why I would love to see

03:28:05.440 --> 03:28:12.520
 why that was the best idea was to go through someone's developed piece of property Richard

03:28:12.520 --> 03:28:17.480
 can we go date uncertain and then just be followed back up with when the applicant and

03:28:17.480 --> 03:28:30.520
 city can choreograph a meeting

03:28:30.520 --> 03:28:37.440
 I think we can have it back by next by the next meeting on the 20th I love the confidence

03:28:37.440 --> 03:28:43.460
 so we have just to have a great staff just to clarify Christian Ellis are you okay with

03:28:43.460 --> 03:28:51.400
 the date certain of May 20th I am and Commissioner Cole do you second a date certain of May 20th

03:28:51.400 --> 03:28:58.040
 yes this is a superseding motion to the motion on the table so we will have this vote first

03:28:58.040 --> 03:29:06.500
 is there any discussion on the motion seeing none I'll call for a vote to postpone this

03:29:06.500 --> 03:29:14.560
 item to a date certain of May 20th be a roll call Christian Ellis I Christian Cole I Christian

03:29:14.560 --> 03:29:25.720
 Beck I Christian Anderson I Christian Pernetta I Christian Smith I chair votes in favor motion

03:29:25.720 --> 03:29:34.120
 carries seven zero looking forward to have this back the next item on our agenda for

03:29:34.120 --> 03:29:39.640
 business is item five the planning and zoning Commission project matrix I will turn this

03:29:39.640 --> 03:29:46.440
 over to Richard for any updates and then discussion I don't have really any updates at this point

03:29:46.440 --> 03:29:53.000
 on on the matrix I matrix items just wanted to give a quick update I know we've had it's

03:29:53.000 --> 03:29:58.600
 almost been a month I think since we since we met although we haven't been accepting

03:29:58.600 --> 03:30:07.400
 applications that has now changed where starting today really council lifted that that that

03:30:07.400 --> 03:30:13.000
 part of the order on Tuesday and with good news we had about nine new submittals came

03:30:13.000 --> 03:30:18.680
 in today so as soon as that was lifted yesterday we had nine new submittals come in and the

03:30:18.680 --> 03:30:25.960
 day before we had ten resubmittals and so with that PNC will continue meeting twice

03:30:25.960 --> 03:30:33.140
 a month so I think that's at least good news in seeing that people are still looking at

03:30:33.140 --> 03:30:39.280
 finishing projects and and moving forward with projects that they had in the hopper

03:30:39.280 --> 03:30:44.840
 council did approve last night the rezoning at I-35 for the offices if you recall just

03:30:44.840 --> 03:30:52.040
 south of Windsor that was the rezoning with the conditions so that was approved unanimously

03:30:52.040 --> 03:30:58.040
 in addition we while it didn't come in front of PNZ council approved an interim mud or

03:30:58.040 --> 03:31:03.880
 or Paul municipal utility district policy what I will do is I will make sure everybody

03:31:03.880 --> 03:31:09.920
 has both the materials that were provided for the work session on the 30th and then

03:31:09.920 --> 03:31:17.680
 what was approved last night and if so wish if anybody desires or wish wishes I'd be happy

03:31:17.680 --> 03:31:23.280
 at least to give a brief overview at at one of the next work sessions just what that means

03:31:23.280 --> 03:31:29.800
 and and what it is but we are seeing quite a number of these municipal utility districts

03:31:29.800 --> 03:31:40.280
 spring up in our ETJ thanks Richard Kushner back yeah Richard can I follow up on that

03:31:40.280 --> 03:31:48.480
 so with the with the application starting today coupled with the small number that trickled

03:31:48.480 --> 03:31:54.720
 through on the previous pipeline when are we I mean we're basically going to start meeting

03:31:54.720 --> 03:32:00.120
 normal schedule is that what you're saying correct we'll go back to our normal schedule

03:32:00.120 --> 03:32:06.640
 so the next meeting will be the 20th and then it'll continue the twice a month for the time

03:32:06.640 --> 03:32:12.800
 being I don't know when we'll be meeting in person anytime soon but I do know that we'll

03:32:12.800 --> 03:32:24.640
 be proceeding like we are today thank you hey Richard I was talking to Jim strange and

03:32:24.640 --> 03:32:31.680
 he said that his project on Ryan Road was retroactively approved I had never heard even

03:32:31.680 --> 03:32:37.640
 of that term can you help me out he said he he had a date that it was going to be approved

03:32:37.640 --> 03:32:41.140
 then he got a letter saying that had been approved I'm assuming that's shot clock related

03:32:41.140 --> 03:32:47.280
 but I'd love to know the mechanism of how his project was retroactively approved that's

03:32:47.280 --> 03:32:53.600
 the one off Ryan that Ryan road that Tim yeah and it might be the the the wrong you might

03:32:53.600 --> 03:32:59.960
 be using the wrong the wrong terminology there was a as part of the council meeting there

03:32:59.960 --> 03:33:08.320
 was an exhibit that was modified as part of that discussion with the community that exhibit

03:33:08.320 --> 03:33:15.040
 wasn't correctly updated and so what happened was the although while the ordinance was passed

03:33:15.040 --> 03:33:25.840
 it came back I want to say two weeks later if I'm oh I'm sorry I'm I was thinking with

03:33:25.840 --> 03:33:34.680
 the number it was the plat because the meeting was cancelled so under the shot clock it automatically

03:33:34.680 --> 03:33:39.280
 got approved automatically got approved that's what I assumed and but when Jim was not aware

03:33:39.280 --> 03:33:43.480
 of the shot clock he would notice the speed on that so I was I think it was shot clock

03:33:43.480 --> 03:33:46.800
 he's like I don't I don't know what it was and I was like well I'm now confused and so

03:33:46.800 --> 03:33:51.280
 as did I and we had I hadn't seen any personally shot clock issues where this automatic approval

03:33:51.280 --> 03:33:57.920
 happens so thanks for that clarification that's what I imagined happened any other items for

03:33:57.920 --> 03:34:06.680
 Richard or staff do you put on the matrix upcoming well that's fantastic guys thanks

03:34:06.680 --> 03:34:11.640
 for a great meeting this evening I think they'll only get smoother from here at nine ten I

03:34:11.640 --> 03:34:13.600
 will close the meeting y'all be safe