00:00:00.000 --> 00:00:14.680
 Okay, it is nine o'clock and we do have a quorum, so let's call to order the March 9th, 2020 public utilities board meeting for the City of Denton.

00:00:14.680 --> 00:00:17.600
 The first items are the consent agenda.

00:00:17.600 --> 00:00:24.440
 Does any board member wish to pull one of the items of A through G?

00:00:24.440 --> 00:00:26.600
 >> I'd like to look at item F.

00:00:26.600 --> 00:00:30.760
 >> Item F, any other items?

00:00:30.760 --> 00:00:37.040
 We have a motion to approve A through E and item G.

00:00:37.040 --> 00:00:41.560
 >> So moved.

00:00:41.560 --> 00:00:43.160
 >> Second.

00:00:43.160 --> 00:00:44.580
 >> All in favor, say aye.

00:00:44.580 --> 00:00:45.080
 >> Aye.

00:00:45.080 --> 00:00:47.960
 >> Okay, item F.

00:00:57.600 --> 00:01:01.560
 >> Terry Gator, fleet superintendent.

00:01:01.560 --> 00:01:10.880
 >> Yeah, Terry, first of all, I want you to know I intend to vote to approve this, but I wanted to call out a statement made in the write-up.

00:01:10.880 --> 00:01:18.200
 It says the great all is nearing the end of its useful life, incurring excessive maintenance costs and increased downtime.

00:01:18.200 --> 00:01:24.640
 To me, that statement is like saying it costs too much and it breaks down all the time.

00:01:24.640 --> 00:01:26.400
 Therefore, give us a new one.

00:01:26.400 --> 00:01:28.040
 That doesn't tell us much.

00:01:28.040 --> 00:01:30.920
 Now, you made a very good presentation last time we were here.

00:01:30.920 --> 00:01:39.920
 You have a method to assign a number to the severity of each piece of mobile equipment.

00:01:39.920 --> 00:01:46.840
 I would recommend that we stop writing sentences like this in here,

00:01:46.840 --> 00:01:52.760
 incurring excessive maintenance costs and increased downtime in this description.

00:01:52.760 --> 00:01:58.400
 And instead maybe attach a one page, even a half page, it doesn't have to be a novel,

00:01:58.400 --> 00:02:04.440
 a summary of your method of evaluating the status of each piece of mobile equipment.

00:02:04.440 --> 00:02:14.880
 So that would tell us quantitatively where this thing stacks up instead of excessive maintenance and increased downtime.

00:02:14.880 --> 00:02:24.960
 And also, in this particular case, you're buying a new piece of equipment that's got different design features than the old one.

00:02:24.960 --> 00:02:30.160
 So there's some rationale for that also, so that's all I have.

00:02:30.160 --> 00:02:32.480
 >> So you don't have a question?

00:02:32.480 --> 00:02:36.320
 >> It was a statement.

00:02:36.320 --> 00:02:37.200
 >> It was a statement, okay.

00:02:37.200 --> 00:02:38.400
 >> And a suggestion.

00:02:38.400 --> 00:02:39.760
 >> Okay, and a suggestion.

00:02:39.760 --> 00:02:45.560
 >> Yes, that we get away from the practice of routinely saying,

00:02:45.560 --> 00:02:48.840
 we need a new one because it costs too much and it breaks down all the time.

00:02:48.840 --> 00:02:55.560
 That needs to be quantified better, and he has a way to do that.

00:02:55.560 --> 00:02:56.240
 >> I know.

00:02:56.240 --> 00:02:56.740
 >> Yeah.

00:02:56.740 --> 00:03:00.880
 >> So is that direction from the board, is that what the consensus from the board is?

00:03:00.880 --> 00:03:03.760
 >> Is that consensus from the board to have the criteria?

00:03:03.760 --> 00:03:07.040
 >> I think it's a good idea to see if he helps explain things better.

00:03:07.040 --> 00:03:16.060
 >> Because he did do the entire presentation last time, and it was, I mean, say, this falls in this category, and that's why we chose this, and it's just reliable.

00:03:16.060 --> 00:03:16.560
 >> All right.

00:03:16.560 --> 00:03:18.160
 >> Thank you.

00:03:18.160 --> 00:03:19.800
 >> Do we have a motion to approve this item?

00:03:19.800 --> 00:03:25.220
 >> Second.

00:03:25.220 --> 00:03:26.480
 >> All in favor, say aye.

00:03:26.480 --> 00:03:27.000
 >> Aye.

00:03:27.000 --> 00:03:27.800
 >> Aye.

00:03:27.800 --> 00:03:30.300
 >> [INAUDIBLE]

00:03:30.300 --> 00:03:32.200
 Items for individual consideration.

00:03:32.200 --> 00:03:37.840
 >> Consider the approval of the MINS from the February 24th, 2020 board meeting.

00:03:37.840 --> 00:03:39.320
 Are there any changes or corrections?

00:03:39.320 --> 00:03:43.320
 >> If none, I'll move approval.

00:03:43.320 --> 00:03:44.640
 >> Do we have a motion to approve?

00:03:44.640 --> 00:03:45.520
 Do we have a second?

00:03:45.520 --> 00:03:46.640
 >> Second.

00:03:46.640 --> 00:03:48.200
 >> All in favor, say aye.

00:03:48.200 --> 00:03:48.920
 >> Aye. >> Aye.

00:03:48.920 --> 00:03:49.520
 >> Any opposed?

00:03:49.520 --> 00:03:50.040
 No.

00:03:50.040 --> 00:03:52.320
 >> Assistance.

00:03:52.320 --> 00:03:53.000
 >> Very quick. >> Yeah, yeah.

00:03:53.000 --> 00:03:57.040
 >> Good morning, members of the board.

00:03:57.040 --> 00:04:01.560
 In the ACM update, really the only thing to really cover with you all is the,

00:04:02.360 --> 00:04:05.160
 environmentally preferable purchasing memo and resolution.

00:04:05.160 --> 00:04:11.280
 I think Mr. Stowe had asked that at our last meeting, and so it's been included for your review.

00:04:11.280 --> 00:04:17.400
 If you've got any questions, I believe there is someone for purchasing here, in the back, way in the back.

00:04:17.400 --> 00:04:21.960
 And so we'll be happy to answer any questions we can if there are any.

00:04:21.960 --> 00:04:23.520
 >> Do you have any questions?

00:04:23.520 --> 00:04:24.600
 No? >> Yeah, I have a question.

00:04:28.280 --> 00:04:35.320
 I went back and I actually looked up environmentally preferable purchasing in the handbook.

00:04:35.320 --> 00:04:38.920
 The purchasing handbook that's online.

00:04:38.920 --> 00:04:44.640
 And I was just wondering if there are any guidelines or

00:04:44.640 --> 00:04:51.880
 specific areas that you all look at, I know that's a very broad question.

00:04:51.880 --> 00:05:00.200
 But this is what the memorandum here with the actual ordinance

00:05:00.200 --> 00:05:05.960
 really doesn't say anything about what the city's

00:05:05.960 --> 00:05:11.120
 goals are in regard to environmentally preferential purchasing.

00:05:11.120 --> 00:05:16.400
 And I don't know if this is going to be addressed in the update of the sustainable dentin plan that's coming in April.

00:05:16.400 --> 00:05:21.080
 But I just wondered if now, if you all actually have codified set of criteria for

00:05:21.080 --> 00:05:25.840
 determining whether or not something is environmentally, pardon me, preferable.

00:05:25.840 --> 00:05:37.400
 >> Right now we're actually working with Catherine Barnett with sustainability to put together a policy for that.

00:05:37.400 --> 00:05:40.000
 There are multiple policies already made within each department.

00:05:40.000 --> 00:05:47.480
 Like Fleet has their own policy, and we're going to work to kind of put all that together here soon.

00:05:47.480 --> 00:05:48.160
 >> Great, thank you.

00:05:48.160 --> 00:05:48.660
 >> Yes.

00:05:51.960 --> 00:05:54.440
 >> Nothing else to report.

00:05:54.440 --> 00:05:56.560
 >> Nothing else to report, all right.

00:05:56.560 --> 00:06:03.020
 Including items, does the board member wish to have anything on a future agenda or?

00:06:03.020 --> 00:06:04.080
 >> I do.

00:06:04.080 --> 00:06:05.200
 >> Yes, George.

00:06:05.200 --> 00:06:09.280
 >> In early February, the city of Denton lost a rather substantial lawsuit

00:06:09.280 --> 00:06:16.480
 involving wrongful termination and involving different utilities, employees.

00:06:17.600 --> 00:06:25.900
 To the extent that it affects this group, I'm thinking that we should be briefed on the results of that lawsuit,

00:06:25.900 --> 00:06:33.600
 the implications of that lawsuit, and that may need to be in closed session or open session.

00:06:33.600 --> 00:06:36.880
 But I would like to see that happen.

00:06:36.880 --> 00:06:40.320
 >> And Larry, that would be in closed session, correct?

00:06:40.320 --> 00:06:41.400
 >> Yes.

00:06:41.400 --> 00:06:42.440
 >> Personnel issue.

00:06:42.440 --> 00:06:44.440
 >> Yeah. >> I thought that was still in appeal.

00:06:47.520 --> 00:06:49.160
 We will need you in closed session.

00:06:49.160 --> 00:06:50.440
 >> Yeah. >> Okay, yeah.

00:06:50.440 --> 00:06:52.240
 >> All I know is what I read in the paper.

00:06:52.240 --> 00:06:54.720
 >> That's why I worded it correctly, it was not good.

00:06:54.720 --> 00:06:55.220
 >> Yeah.

00:06:55.220 --> 00:07:01.800
 >> And then my second issue is a question.

00:07:01.800 --> 00:07:06.600
 When will this group review financial statements for

00:07:06.600 --> 00:07:09.720
 Denton Municipal Utilities next?

00:07:09.720 --> 00:07:12.640
 >> Are you speaking about just the budget process?

00:07:12.640 --> 00:07:13.160
 >> Yeah.

00:07:13.160 --> 00:07:16.200
 >> I was talking about actual rather than- >> You mean the results, quarterly results.

00:07:16.200 --> 00:07:17.160
 >> Quarterly results, yeah.

00:07:18.440 --> 00:07:24.120
 >> Let me have David Gaines come up, because those are generated from finance,

00:07:24.120 --> 00:07:27.040
 and those can be included in an upcoming report.

00:07:27.040 --> 00:07:29.920
 >> [INAUDIBLE]

00:07:29.920 --> 00:07:32.480
 >> Well, there's multiple options where you'll see them.

00:07:32.480 --> 00:07:37.400
 First being the quarterly reports that we submit to council into the PUB as we

00:07:37.400 --> 00:07:41.320
 wrap up the quarterly financials, usually a couple months after the quarter end.

00:07:41.320 --> 00:07:42.680
 So you'll see them there.

00:07:42.680 --> 00:07:44.640
 Obviously, we're about to kick off the budget process.

00:07:44.640 --> 00:07:48.200
 Those throughout the budget process will have detailed financials of what happened

00:07:48.200 --> 00:07:50.360
 last year, where we are, year to date this year.

00:07:50.360 --> 00:07:52.920
 As we talk about the decisions to make moving forward.

00:07:52.920 --> 00:07:55.640
 With the DEC specifically, obviously, we have the DEC report that comes out.

00:07:55.640 --> 00:07:58.680
 That'll be on the next PUB's ACM update.

00:07:58.680 --> 00:08:02.640
 So, numerous steps along the way, but I guess as far as the actual financials of

00:08:02.640 --> 00:08:06.280
 where we are, we have our quarterly report that we produce every quarter and

00:08:06.280 --> 00:08:07.720
 that will come to PUB.

00:08:07.720 --> 00:08:11.480
 >> Okay, I think I've been on the, pardon me.

00:08:11.480 --> 00:08:13.120
 >> And that'll be April, right?

00:08:13.120 --> 00:08:15.440
 The March 31st.

00:08:15.440 --> 00:08:18.280
 >> Right, so we had to take a little bit of time to get ready as we close the

00:08:18.280 --> 00:08:20.520
 votes, but yeah, following them.

00:08:20.520 --> 00:08:24.360
 >> I guess my question is, I think I've been on this group for more than a quarter

00:08:24.360 --> 00:08:28.680
 now and haven't seen one of those distributed yet to the PUB.

00:08:28.680 --> 00:08:29.420
 >> Quarterly report.

00:08:29.420 --> 00:08:34.520
 >> We've seen dashboards.

00:08:34.520 --> 00:08:35.040
 >> Sure.

00:08:35.040 --> 00:08:35.960
 >> But not the actual.

00:08:35.960 --> 00:08:39.800
 >> Well, our quarter report is online right now and I believe we've brought it to PUB.

00:08:39.800 --> 00:08:42.440
 We'll go back and check and make sure that it can.

00:08:43.120 --> 00:08:45.080
 >> That is good to have, sure.

00:08:45.080 --> 00:08:47.580
 >> Great.

00:08:47.580 --> 00:08:50.700
 >> Thank you. >> Thank you.

00:08:50.700 --> 00:08:51.760
 >> That's it?

00:08:51.760 --> 00:08:54.920
 All right, then our next item is a work session.

00:08:54.920 --> 00:08:59.440
 Receive a report and hold a discussion and give staff direction regarding DM&E's

00:08:59.440 --> 00:09:02.720
 proposed electric vehicle charging infrastructure strategy.

00:09:02.720 --> 00:09:05.880
 >> Good morning, PUB members.

00:09:05.880 --> 00:09:11.200
 Chris Ludrick, the executive manager of energy services here to introduce

00:09:11.200 --> 00:09:16.380
 a presentation we put together for you for some EV charging station options.

00:09:16.380 --> 00:09:21.160
 In 2013, DM&E placed some charging stations,

00:09:21.160 --> 00:09:25.760
 some blink charging stations at the North Lakes Library, North Lakes Park,

00:09:25.760 --> 00:09:29.840
 South Lakes Library, South Lakes Park, a couple of DM&E, and

00:09:29.840 --> 00:09:34.200
 I believe one other location, no other location, so.

00:09:34.200 --> 00:09:35.720
 So anyway, so I'm here to introduce Chase.

00:09:35.720 --> 00:09:38.280
 So Chase is kind of new to our group.

00:09:38.280 --> 00:09:43.480
 He's our EV specialist, so he's been tasked with putting this presentation

00:09:43.480 --> 00:09:48.800
 together and he'll give you some options for upgrading the chargers that we have.

00:09:48.800 --> 00:09:51.800
 And the state that they're in, and kind of the justification for that.

00:09:51.800 --> 00:09:55.320
 And finally, he'll end with a kind of looking forward.

00:09:55.320 --> 00:09:59.920
 Electric vehicles are gonna be a big challenge for the utilities going forward.

00:09:59.920 --> 00:10:04.560
 So you'll see some of the predictions as the adoption rate increases.

00:10:04.560 --> 00:10:08.360
 They could put a strain on our distribution system that we have to be ready four

00:10:08.360 --> 00:10:09.240
 years in advance.

00:10:09.240 --> 00:10:12.080
 So we're not ready to tackle that issue today.

00:10:12.080 --> 00:10:16.560
 The utilities are still trying to come up with some ideas about how to handle

00:10:16.560 --> 00:10:19.680
 that potential electrical load in the future.

00:10:19.680 --> 00:10:21.920
 And how do you get that to an off peak time?

00:10:21.920 --> 00:10:29.760
 And how do you make sure that it doesn't break your distribution system or

00:10:29.760 --> 00:10:31.160
 put too much stress on it?

00:10:31.160 --> 00:10:34.760
 So with that, I'll introduce Chase Whitman and after that, after he's done,

00:10:34.760 --> 00:10:36.280
 we'll stand for any questions you may have.

00:10:36.280 --> 00:10:45.280
 [BLANK_AUDIO]

00:10:45.280 --> 00:10:46.960
 >> Good morning, PEB members.

00:10:46.960 --> 00:10:50.280
 Like Mr. Lutrick mentioned, my name is Chase Whitman.

00:10:50.280 --> 00:10:52.920
 I'm here with the DME Energy Services Team,

00:10:52.920 --> 00:10:54.560
 presenting our electric vehicle strategy.

00:10:54.560 --> 00:11:00.440
 The sustainability plan gives direction to develop an electric vehicle strategy

00:11:00.440 --> 00:11:02.480
 to address short and long term infrastructure and

00:11:02.480 --> 00:11:05.200
 charging needs as electric vehicle ownership expands.

00:11:05.200 --> 00:11:09.160
 So in conjunction with the sustainability team,

00:11:09.160 --> 00:11:13.520
 we have developed a four phase forward looking electric vehicle strategy

00:11:13.520 --> 00:11:17.800
 to address those short term needs with regard to services that we provide and

00:11:17.800 --> 00:11:21.240
 access to electric vehicle charging infrastructure.

00:11:21.240 --> 00:11:24.600
 As well as look forward and address the long term infrastructure needs and

00:11:24.600 --> 00:11:29.560
 risks that might come about with increased levels of electric vehicle adoption.

00:11:29.560 --> 00:11:35.320
 Our financial premise moving forward is to provide all of these public charging

00:11:35.320 --> 00:11:38.840
 services in a manner that recovers the cost of providing that service.

00:11:38.840 --> 00:11:43.880
 The majority of the time, that will mean that the rate that is billed to customers

00:11:43.880 --> 00:11:48.480
 using our publicly available charging infrastructure will be designed to

00:11:48.480 --> 00:11:52.560
 both cover the ongoing cost of providing that service as well as within a reasonable

00:11:52.560 --> 00:11:56.680
 time frame recover the capital expenditures necessary to implement that infrastructure.

00:11:58.920 --> 00:12:02.920
 In the long term, our priority is to encourage charging behavior that won't

00:12:02.920 --> 00:12:04.400
 compromise the distribution grid.

00:12:04.400 --> 00:12:09.440
 Projections vary pretty widely on the subject since the industry of electric

00:12:09.440 --> 00:12:12.120
 vehicles is quite young and changing very rapidly.

00:12:12.120 --> 00:12:16.680
 But estimates from the Department of Energy find that medium to high levels of

00:12:16.680 --> 00:12:20.800
 electric vehicle adoption, which in their projections are about 20 to 30% penetration

00:12:20.800 --> 00:12:25.120
 by 2050, have the potential to increase residential electricity demand by 20 to

00:12:25.120 --> 00:12:27.080
 38% in the coming decades.

00:12:28.640 --> 00:12:30.120
 Without incentives to do otherwise,

00:12:30.120 --> 00:12:33.520
 most electric vehicle drivers plug their vehicle in immediately upon return home

00:12:33.520 --> 00:12:38.160
 from work, coincident with our peak on the distribution system as it is.

00:12:38.160 --> 00:12:43.440
 And such a dramatic increase in our peak electricity demand could have substantial

00:12:43.440 --> 00:12:46.680
 impact to the distribution system that we want to plan for and mitigate.

00:12:46.680 --> 00:12:51.800
 So our plan has four phases, as I mentioned a minute ago.

00:12:51.800 --> 00:12:56.600
 The first three phases focus on the short to medium term issues of access to charging

00:12:56.600 --> 00:13:00.120
 and services that we provide at DME through the upgrading of our existing

00:13:00.120 --> 00:13:05.000
 chargers, establishing a rebate program to share the costs with the private sector

00:13:05.000 --> 00:13:07.880
 to build out electric vehicle charging infrastructure.

00:13:07.880 --> 00:13:12.360
 And to expand the city owned infrastructure where necessary.

00:13:12.360 --> 00:13:16.880
 The fourth phase of our plan is that long term outlook regarding developing

00:13:16.880 --> 00:13:20.880
 a program to encourage charging behaviors that will not compromise the distribution

00:13:20.880 --> 00:13:25.400
 system and find a mutually beneficial arrangement to meet those needs for

00:13:25.400 --> 00:13:27.960
 our customers that will want to drive electric vehicles.

00:13:27.960 --> 00:13:29.400
 As well as take care of our infrastructure.

00:13:29.400 --> 00:13:32.840
 So the first phase of our plan,

00:13:32.840 --> 00:13:35.440
 the modernization of our existing charging infrastructure network.

00:13:35.440 --> 00:13:40.360
 Primarily focuses on the upgrade to a modern charging platform of our existing

00:13:40.360 --> 00:13:43.160
 blink stations that Chris mentioned.

00:13:43.160 --> 00:13:46.960
 As well as looking at the possible installation of a DC fast charger for

00:13:46.960 --> 00:13:50.560
 public use along I-35 located at our Pocker's Page substation.

00:13:51.960 --> 00:13:56.120
 The Texas Emissions Reduction Plan underway from the Texas Commission on

00:13:56.120 --> 00:14:00.320
 Environmental Quality offers grants that can fund up to 50% of the cost of

00:14:00.320 --> 00:14:03.480
 alternative fueling projects for vehicles with electric vehicle charging

00:14:03.480 --> 00:14:05.160
 being one of the focuses there.

00:14:05.160 --> 00:14:07.720
 So we are looking to take advantage of those funding opportunities.

00:14:07.720 --> 00:14:14.360
 So as mentioned a couple minutes ago, our current charger locations that are

00:14:14.360 --> 00:14:18.080
 available to the public are at North Lakes Park, North Branch Library,

00:14:18.080 --> 00:14:20.520
 South Lakes Park, and South Branch Library.

00:14:20.520 --> 00:14:24.600
 As it stands to date since 2013, the chargers at the North locations have

00:14:24.600 --> 00:14:28.720
 accounted for approximately 85% of charger use over time.

00:14:28.720 --> 00:14:33.720
 Due to the data limitations and the information that is provided to us on

00:14:33.720 --> 00:14:36.560
 charger use, we can't really predict or

00:14:36.560 --> 00:14:39.600
 make a determination what we think the cause of that is.

00:14:39.600 --> 00:14:43.160
 So we're looking to continue gathering data and perhaps discern more about why

00:14:43.160 --> 00:14:45.360
 that distribution settles the way that it does.

00:14:45.360 --> 00:14:49.720
 >> Can I ask, so that means people are using it?

00:14:49.720 --> 00:14:50.760
 >> Yes, people are using it.

00:14:50.760 --> 00:14:52.160
 >> Okay, all right.

00:14:52.160 --> 00:14:56.160
 >> When, in 2013 when the chargers were installed, usage was not very high and

00:14:56.160 --> 00:14:58.680
 not very many people had electric vehicles.

00:14:58.680 --> 00:15:03.040
 The charging utilization has been increasing pretty dramatically over time.

00:15:03.040 --> 00:15:04.640
 But that being said,

00:15:04.640 --> 00:15:07.320
 electric vehicles still account for less than 5% of vehicles.

00:15:07.320 --> 00:15:10.200
 So the thing, there isn't a line around the block to use the things, but

00:15:10.200 --> 00:15:11.000
 it's increased.

00:15:11.000 --> 00:15:19.080
 So the installation of modern platform dual port charging infrastructure

00:15:19.080 --> 00:15:20.520
 at each of those locations, so

00:15:20.520 --> 00:15:26.240
 replacing the existing single port chargers that were installed in 2013 with

00:15:26.240 --> 00:15:30.440
 one dual port charger on a modern platform to meet those charging needs and

00:15:30.440 --> 00:15:34.040
 keep charging capabilities and capacity approximately the same,

00:15:34.040 --> 00:15:38.280
 will cost approximately $15,600 between purchase of the new chargers and

00:15:38.280 --> 00:15:42.000
 installation and then removal of the existing chargers.

00:15:42.000 --> 00:15:46.000
 We have the possibility for 50% funding of that project through the TURP grants

00:15:46.000 --> 00:15:47.600
 mentioned a minute ago.

00:15:47.600 --> 00:15:50.800
 Those applications for the grant program are due in the next couple of weeks.

00:15:50.800 --> 00:15:54.720
 Hopefully we will hear back sometime in March or April as to the status of those.

00:15:54.720 --> 00:15:57.880
 And then we'll come forward with hopes to gain authorization to use that grant

00:15:57.880 --> 00:15:59.360
 funding to proceed with that project.

00:15:59.360 --> 00:16:04.080
 In the short term, the rate that is charged for use of the chargers will

00:16:04.080 --> 00:16:07.320
 remain the current rate that is being billed from the existing platform,

00:16:07.320 --> 00:16:09.680
 just not to price shock anybody.

00:16:09.680 --> 00:16:11.000
 It's four cents a minute right now.

00:16:11.000 --> 00:16:17.280
 As it stands, that covers the ongoing costs of the infrastructure that was put

00:16:17.280 --> 00:16:21.760
 in place and as usage is changing pretty rapidly with those, so

00:16:21.760 --> 00:16:26.320
 we will gather some data, make some predictions and then determine on an ongoing basis.

00:16:26.320 --> 00:16:27.320
 Yes sir.

00:16:27.320 --> 00:16:30.960
 >> Four cents a minute, how did that equate to cost per kilowatt hour?

00:16:30.960 --> 00:16:36.520
 >> So the rate of power flow into the batteries

00:16:36.520 --> 00:16:38.800
 varies with the charge level of the battery.

00:16:38.800 --> 00:16:42.960
 So ones that are quite close to full, it's less kilowatt hours flowing.

00:16:42.960 --> 00:16:47.800
 The total charge time at the rate that these chargers charge is about four hours

00:16:47.800 --> 00:16:49.920
 from completely empty to completely full.

00:16:49.920 --> 00:16:52.240
 So that's about 10 kilowatt hours per hour,

00:16:52.240 --> 00:16:54.640
 given the average size of an electric vehicle battery.

00:16:54.640 --> 00:16:58.960
 So some math there, a sixth of a kilowatt hour per minute.

00:16:58.960 --> 00:17:05.240
 But the billing structure is not set to bill by the kilowatt hours.

00:17:05.240 --> 00:17:07.280
 I mentioned it bills on a per minute basis.

00:17:07.280 --> 00:17:11.560
 >> But on average about a sixth of a kilowatt hour per minute.

00:17:11.560 --> 00:17:15.360
 >> And we're charging four cents per minute to use the facility.

00:17:15.360 --> 00:17:19.480
 >> Yes, and with the existing platform, we do not have control over the price that

00:17:19.480 --> 00:17:24.240
 is billed that is set by the system operator, Blink, that installed them for us.

00:17:24.240 --> 00:17:27.680
 That's one of the reasons that we're looking to move to a different platform

00:17:27.680 --> 00:17:30.440
 that allows us to take some price control.

00:17:30.440 --> 00:17:33.920
 That opens up a lot of opportunities, whether it's once we've recovered

00:17:33.920 --> 00:17:37.400
 the capital cost of the chargers and there's only a need to cover ongoing costs,

00:17:37.400 --> 00:17:41.760
 perhaps a price reduction or ensuring that we can cover our costs.

00:17:41.760 --> 00:17:45.120
 There are some interesting programs that have been piloted by Austin Energy and

00:17:45.120 --> 00:17:49.600
 CPS Energy in San Antonio, where customers can pay just a flat rate on their monthly

00:17:49.600 --> 00:17:52.160
 bill for unlimited access to the public charging.

00:17:52.160 --> 00:17:55.800
 That's something that if we determined we would like to look into or pilot,

00:17:55.800 --> 00:18:00.080
 we'd have at least the flexibility with a new platform to look into.

00:18:00.080 --> 00:18:01.720
 >> Do you know what that dollar amount is, that flat rate?

00:18:01.720 --> 00:18:05.080
 >> At Austin Energy, I believe it is $60 a year.

00:18:05.080 --> 00:18:10.580
 >> Okay.

00:18:10.580 --> 00:18:14.760
 >> So as mentioned here, just a brief summary and

00:18:14.760 --> 00:18:19.840
 overview of the four locations that we've got, as well as the cost per location,

00:18:19.840 --> 00:18:21.480
 to perform those upgrades.

00:18:21.480 --> 00:18:26.160
 As mentioned, that will be approximately $15,600 all in for the project.

00:18:26.160 --> 00:18:34.480
 The TURP grant program does place special emphasis on the build out of DC fast

00:18:34.480 --> 00:18:36.960
 charging infrastructure along the interstate corridors.

00:18:36.960 --> 00:18:43.800
 They feel that that is one of the motivations to encourage electric vehicle

00:18:43.800 --> 00:18:46.440
 adoption would be improved access, especially for people that are traveling

00:18:46.440 --> 00:18:50.120
 longer distance to not have to take several hours to charge back up.

00:18:50.120 --> 00:18:54.080
 So we do have one location of city owned property right along the interstate

00:18:54.080 --> 00:18:59.400
 frontage at our Pockers Page substation that we are looking to build a DC fast

00:18:59.400 --> 00:19:01.480
 charger to provide access there.

00:19:01.480 --> 00:19:05.760
 That location at the substation provides convenient access to the electric

00:19:05.760 --> 00:19:07.720
 infrastructure that would be needed to power a charger,

00:19:07.720 --> 00:19:10.960
 as well as some city property to actually provide parking.

00:19:10.960 --> 00:19:16.760
 With the project, total estimate cost for that would be about $75,000,

00:19:16.760 --> 00:19:19.560
 with the possibility of 50% funding from the grant program.

00:19:19.560 --> 00:19:24.800
 Our hope is that the rate there, if the project were to be implemented,

00:19:24.800 --> 00:19:32.520
 since the test case here is that those interstate locations gain not only usage

00:19:32.520 --> 00:19:36.760
 from the local community looking for a charge in a pinch, but also travelers

00:19:36.760 --> 00:19:42.520
 passing through on the interstate there, we hope the thesis being tested there

00:19:42.520 --> 00:19:47.160
 would be that spreading those costs across more people and transient chargers

00:19:47.160 --> 00:19:51.600
 would allow to charge a lower rate per kilowatt hour per minute of charging.

00:19:51.600 --> 00:19:57.840
 -Question, I know what a TURP grant is, but how it applies to this I don't understand.

00:19:57.840 --> 00:20:00.280
 Is there an exchange other than the purchase of the equipment?

00:20:00.280 --> 00:20:02.120
 Do you have to take something out?

00:20:02.120 --> 00:20:07.840
 Because in the past TURP grants were, I'll shut down my 1985 diesel and replace it

00:20:07.840 --> 00:20:11.560
 with a 2020 diesel, and then TURP funds a portion of that.

00:20:11.560 --> 00:20:15.600
 -So the TURP program beginning this year for the alternative fueling facilities

00:20:15.600 --> 00:20:21.120
 program funds not only the replacement of existing fossil fuel fueling facilities,

00:20:21.120 --> 00:20:26.760
 but the development of new construction for those alternative fueling facilities.

00:20:26.760 --> 00:20:31.520
 This is a project that would be highly dependent on the grant funding being awarded.

00:20:31.520 --> 00:20:34.080
 So when we learn about the status of that in the next couple months,

00:20:34.080 --> 00:20:36.840
 if we are awarded that grant money, we would build out a more comprehensive plan

00:20:36.840 --> 00:20:41.320
 and come forward to get direction and make a determination to move forward

00:20:41.320 --> 00:20:46.000
 with the project at that time.

00:20:46.000 --> 00:20:49.760
 The second phase of our plan involves the establishment of a rebate program

00:20:49.760 --> 00:20:56.440
 to share costs for the build out of electric vehicle charging infrastructure.

00:20:56.440 --> 00:21:00.360
 When electric vehicle drivers are surveyed, the most common places that they cite

00:21:00.360 --> 00:21:04.720
 a desire to have access to charging infrastructure are retail establishments,

00:21:04.720 --> 00:21:09.080
 restaurants, entertainment venues, places where they spend their leisure time.

00:21:09.080 --> 00:21:13.120
 Since perhaps intuitively most of those locations aren't owned by the city,

00:21:13.120 --> 00:21:17.360
 we do not have much flexibility to provide charging infrastructure at that locations.

00:21:17.360 --> 00:21:22.800
 So we feel that the most effective way to facilitate the development of that infrastructure

00:21:22.800 --> 00:21:25.680
 would be to share some of the costs there.

00:21:25.680 --> 00:21:29.880
 I understood that Cracker Barrel was putting them across the nation.

00:21:29.880 --> 00:21:33.240
 Do we have some at the Cracker Barrel around here?

00:21:33.240 --> 00:21:35.240
 I'm not aware of any at the Cracker Barrel.

00:21:35.240 --> 00:21:38.040
 There are a couple of places that have put in chargers as provision,

00:21:38.040 --> 00:21:39.960
 kind of as a complimentary service to their customers.

00:21:39.960 --> 00:21:42.160
 Cinemark here in Denton is one that comes to mind.

00:21:42.160 --> 00:21:43.800
 They just recently put in chargers.

00:21:43.800 --> 00:21:47.600
 So this is a behavior that you're seeing in very limited amounts as it stands.

00:21:47.600 --> 00:21:51.520
 The idea with a rebate or incentive program would be to further drive

00:21:51.520 --> 00:21:54.240
 the expansion of those types of networks.

00:21:54.240 --> 00:21:55.960
 Just a quick question.

00:21:55.960 --> 00:22:00.360
 You have Tesla with four locations.

00:22:00.360 --> 00:22:06.000
 I know there's six superchargers out just off 35.

00:22:06.000 --> 00:22:08.360
 Is that what's included in these four?

00:22:08.360 --> 00:22:12.560
 So that is each geographic address that holds chargers.

00:22:12.560 --> 00:22:15.160
 So like Southlake and?

00:22:15.160 --> 00:22:17.760
 So some of the Tesla locations, for example,

00:22:17.760 --> 00:22:20.800
 included here would be the chargers located at Razor Ranch

00:22:20.800 --> 00:22:23.000
 as well as the embassy suites, chargers.

00:22:23.000 --> 00:22:25.680
 And there are a couple other two locations on I-35

00:22:25.680 --> 00:22:27.760
 that have Tesla chargers available.

00:22:27.760 --> 00:22:30.760
 So this is just the physical addresses that have chargers present.

00:22:30.760 --> 00:22:34.120
 It's not the number of chargers, it's the address of the chargers.

00:22:34.120 --> 00:22:35.040
 OK, thank you.

00:22:35.040 --> 00:22:36.480
 Yes, sir.

00:22:36.480 --> 00:22:42.120
 So the focus here to attain cost recovery for this program,

00:22:42.120 --> 00:22:45.480
 at least the thesis that would need proving out over time,

00:22:45.480 --> 00:22:48.320
 would be that sharing those costs and providing that rebate,

00:22:48.320 --> 00:22:50.800
 those funds would be recouped over time through electricity sales

00:22:50.800 --> 00:22:51.920
 through the charger.

00:22:51.920 --> 00:22:56.640
 These chargers have, at least with the advancement of the technology,

00:22:56.640 --> 00:23:01.680
 about a five to 10-year useful lifespan before they become outdated.

00:23:01.680 --> 00:23:05.240
 Based on the usages that we see from our publicly owned chargers,

00:23:05.240 --> 00:23:07.320
 that is a sufficient time frame at those usage levels

00:23:07.320 --> 00:23:11.160
 to recover those costs through the electricity sales.

00:23:11.160 --> 00:23:15.120
 We plan to budget $20,000 for fiscal year 2021

00:23:15.120 --> 00:23:17.960
 to provide up to 10 rebates for the installation

00:23:17.960 --> 00:23:19.400
 of those level two chargers,

00:23:19.400 --> 00:23:22.520
 sharing that cost at a rate of up to $2,000.

00:23:22.520 --> 00:23:24.680
 The average cost for a level two charger installation

00:23:24.680 --> 00:23:26.280
 is anywhere from $6,000 to $10,000,

00:23:26.280 --> 00:23:31.480
 so this would be in the 33% to 20% price range that we would cover

00:23:31.480 --> 00:23:34.480
 with the private entity providing the charge and covering the balance.

00:23:34.480 --> 00:23:37.000
 I just had a quick question.

00:23:37.000 --> 00:23:40.520
 What's a level two charger as opposed to other kinds of chargers?

00:23:40.520 --> 00:23:44.680
 So the electric vehicle charging infrastructure is ranked

00:23:44.680 --> 00:23:46.840
 based on the power output of the chargers.

00:23:46.840 --> 00:23:52.000
 So level one charging is considered to be a 120-volt kind of...

00:23:52.000 --> 00:23:56.120
 If you were to plug charging into the standard wall outlet in your house,

00:23:56.120 --> 00:23:59.160
 that takes about 16 hours for a full charge from empty.

00:23:59.160 --> 00:24:02.040
 Level two charging is 240-volt charging,

00:24:02.040 --> 00:24:04.880
 typically anywhere from 7 to 10 kilowatts of power

00:24:04.880 --> 00:24:07.600
 that can charge a vehicle from empty to full,

00:24:07.600 --> 00:24:09.040
 depending on the size of the vehicle's battery,

00:24:09.040 --> 00:24:10.880
 anywhere from three to six hours.

00:24:10.880 --> 00:24:18.080
 So is there a chance that level two is going to be obsolete in a year?

00:24:18.080 --> 00:24:22.280
 That seems unlikely given the electrical infrastructure limitations.

00:24:22.280 --> 00:24:24.680
 There is some build-out and was just mentioned previously

00:24:24.680 --> 00:24:26.680
 regarding DC fast chargers.

00:24:26.680 --> 00:24:29.680
 As it stands currently, those are about five to six times the cost

00:24:29.680 --> 00:24:36.000
 of level two chargers as well as much more intense infrastructure requirements

00:24:36.000 --> 00:24:39.200
 to provide the power that's needed to charge those.

00:24:39.200 --> 00:24:42.720
 So at least given the data that we have over the last few years across the nation,

00:24:42.720 --> 00:24:47.960
 level two build-out is occurring at a much, much higher level than DC fast charging.

00:24:47.960 --> 00:24:50.840
 Chase, how fast is a fast charger?

00:24:50.840 --> 00:24:53.800
 So I apologize, I meant to mention that in the last slide.

00:24:53.800 --> 00:25:00.640
 A fast charger can charge a vehicle from empty to full typically in 30 to 45 minutes.

00:25:00.640 --> 00:25:06.440
 So industry predictions, you know, kind of estimate that in the 30 to 40-year time frame

00:25:06.440 --> 00:25:10.040
 for mass EV adoption, fast charging would be the kinds of charges

00:25:10.040 --> 00:25:13.040
 that you see replacing gas stations on street corners.

00:25:13.040 --> 00:25:16.920
 However, like I mentioned previously, the infrastructure limitations

00:25:16.920 --> 00:25:20.360
 for those have not been dealt with yet.

00:25:20.360 --> 00:25:22.720
 >> So Buc-E's would have a whole bank of--

00:25:22.720 --> 00:25:25.080
 >> Two or three hundred of them, I suppose.

00:25:25.080 --> 00:25:26.400
 >> Just checking.

00:25:26.400 --> 00:25:32.080
 >> Well, that would be a drain on our system.

00:25:32.080 --> 00:25:35.120
 >> So phase three of our plan involves the expansion

00:25:35.120 --> 00:25:38.040
 of the city's owned public charging network.

00:25:38.040 --> 00:25:41.760
 After a couple years of providing those rebates and facilitating the development

00:25:41.760 --> 00:25:47.640
 of privately-owned charging infrastructure, we will do some analysis, keep our eyes open

00:25:47.640 --> 00:25:51.680
 and engage with the community regarding the areas that they feel are being underserved

00:25:51.680 --> 00:25:54.840
 with that private investment if there is demand for electric vehicle charging

00:25:54.840 --> 00:25:57.360
 that is not being met through private investment.

00:25:57.360 --> 00:26:00.280
 That would be the types of situations that the city would look into building

00:26:00.280 --> 00:26:03.160
 out our city-owned infrastructure network.

00:26:03.160 --> 00:26:06.720
 A couple of places that come to mind are the public parking lots

00:26:06.720 --> 00:26:11.120
 around the downtown square area or neighborhood parks distributed through Denton,

00:26:11.120 --> 00:26:14.680
 particularly in areas with high renter populations if they don't feel

00:26:14.680 --> 00:26:17.640
 that their apartment complexes, what have you,

00:26:17.640 --> 00:26:21.120
 are providing the charging that they wish to have access to.

00:26:21.120 --> 00:26:26.000
 So the grant opportunities for electric vehicles and electric vehicle infrastructure are expanding

00:26:26.000 --> 00:26:30.240
 constantly, so we would always seek to leverage those whenever possible and share some

00:26:30.240 --> 00:26:35.760
 of those costs to provide those services throughout the city at at least cost.

00:26:35.760 --> 00:26:40.680
 Our target date to begin looking at where the rebate program has been successful

00:26:40.680 --> 00:26:47.800
 and where expansion of the publicly-owned network is necessary would be in the 2022-2023 timeframe

00:26:47.800 --> 00:26:51.200
 to see where those rebates have been utilized.

00:26:51.200 --> 00:26:57.640
 The fourth phase of our program takes a longer-term approach regarding infrastructure risk

00:26:57.640 --> 00:27:01.200
 that would arise with high levels of electric vehicle adoption.

00:27:01.200 --> 00:27:06.520
 As mentioned earlier, most EV drivers just plug their car in upon return home from work

00:27:06.520 --> 00:27:09.800
 without a second thought if they don't have an incentive to do otherwise,

00:27:09.800 --> 00:27:12.800
 a coincidence with our electric system peak.

00:27:12.800 --> 00:27:18.760
 In the event that even 20 or 30 percent of people begin driving, just on one street,

00:27:18.760 --> 00:27:22.600
 begin driving electric vehicles and five people, neighbors all come in and plug

00:27:22.600 --> 00:27:26.760
 in their car at the exact same time at 5 p.m., we'd be looking at risk of running

00:27:26.760 --> 00:27:30.080
 into reliability issues and outages potentially.

00:27:30.080 --> 00:27:34.360
 So as electric vehicle adoption increases and since we don't know the timeframe,

00:27:34.360 --> 00:27:39.080
 it would kind of be on an ongoing basis knowing when we need to be prepared for that.

00:27:39.080 --> 00:27:44.520
 But we plan to look at some of the methods that are being tested in the electric utilities industry

00:27:44.520 --> 00:27:49.080
 in order to incentivize people to shift their charging behaviors in a way

00:27:49.080 --> 00:27:52.400
 that isn't too inconvenient but also protects our infrastructure.

00:27:52.400 --> 00:27:56.360
 Some of the methods that have been met with success in pilot so far

00:27:56.360 --> 00:28:00.480
 around the country involve time of use charging rates, whether just for residential energy

00:28:00.480 --> 00:28:02.960
 as a whole or for charging in particular.

00:28:02.960 --> 00:28:07.160
 Since the cars have the ability to program a charge start time, folks can still plug in right

00:28:07.160 --> 00:28:09.960
 when they get home from work but the car won't start charging until 10 p.m. say

00:28:09.960 --> 00:28:13.360
 when their electricity gets cheaper and it won't strain our grid so much.

00:28:13.360 --> 00:28:18.520
 There are other incentive programs that are being tested out to kind of meet those needs

00:28:18.520 --> 00:28:22.840
 such as utilities might do the electrical upgrade or buy a home charger for somebody

00:28:22.840 --> 00:28:27.240
 with the agreement that they won't charge say between 5 and 8 p.m.

00:28:27.240 --> 00:28:28.720
 or other peak hours as determined.

00:28:28.720 --> 00:28:32.880
 So as electrical vehicle adoption increases and we kind of foresee based

00:28:32.880 --> 00:28:37.000
 on the trajectory of point where that might become a pertinent issue or consideration

00:28:37.000 --> 00:28:42.040
 for us, we will kind of communicate that to you all and continue doing our research

00:28:42.040 --> 00:28:47.040
 and begin testing perhaps a pilot program down the line if we deem it appropriate to see

00:28:47.040 --> 00:28:50.880
 which one of these methods might best meet the needs of our community

00:28:50.880 --> 00:28:53.360
 in a mutually beneficial manner.

00:28:53.360 --> 00:28:55.600
 Yes sir.

00:28:55.600 --> 00:28:59.120
 >> How would you deal with or have you thought about, I'm sure you have,

00:28:59.120 --> 00:29:03.240
 what if a home has solar installation on it?

00:29:03.240 --> 00:29:09.280
 >> So that would certainly impact their usage patterns and their demand patterns in a way.

00:29:09.280 --> 00:29:13.400
 We haven't looked at that specific case as far as the electrical ramifications of pairing

00:29:13.400 --> 00:29:16.920
 that at different times with electric vehicle charging.

00:29:16.920 --> 00:29:24.080
 The concern there involves the decline in solar production in the evening

00:29:24.080 --> 00:29:26.560
 as we reach our evening peak.

00:29:26.560 --> 00:29:31.480
 So we distributed solar necessarily on an individual basis

00:29:31.480 --> 00:29:35.320
 and we haven't done any data on it but we would have to determine whether

00:29:35.320 --> 00:29:39.240
 that would reduce the peak at all and protect the distribution system.

00:29:39.240 --> 00:29:43.520
 It's something to look at though.

00:29:43.520 --> 00:29:47.920
 So in summary, given the direction of the sustainability plan to take these

00:29:47.920 --> 00:29:53.720
 into consideration, our electric vehicle plan looking forward addresses the short term needs

00:29:53.720 --> 00:29:59.040
 for charging access and infrastructure as well as looking forward with regards

00:29:59.040 --> 00:30:03.240
 to the risk posed by high levels of electric vehicle adoption and ways to mitigate

00:30:03.240 --> 00:30:07.080
 that possible risk to our distribution system.

00:30:07.080 --> 00:30:10.160
 We hope that in the long term, as electric vehicle adoption does rise,

00:30:10.160 --> 00:30:15.000
 we can find a mutually beneficial way for the utility to pair with our residents

00:30:15.000 --> 00:30:19.400
 and avoid those risks without penalizing those that drive electric vehicles.

00:30:19.400 --> 00:30:23.720
 So that's our plan.

00:30:23.720 --> 00:30:26.360
 >> Ed, I'm surprised you don't have more questions.

00:30:26.360 --> 00:30:31.000
 >> I have a question.

00:30:31.000 --> 00:30:38.240
 Do you have any data on for any charging location what the use is compared

00:30:38.240 --> 00:30:42.000
 to the installed electrical capacity for that station?

00:30:42.000 --> 00:30:46.760
 >> We do not have any data really available regarding that.

00:30:46.760 --> 00:30:53.960
 >> Oh, speaking of Ed, so the Tesla chargers are specific to Teslas

00:30:53.960 --> 00:30:58.560
 and presumably the city would not be installing any of those.

00:30:58.560 --> 00:31:05.480
 So if everybody who's buying new electric vehicles bought a Tesla,

00:31:05.480 --> 00:31:10.560
 how would the city react to those charging needs?

00:31:10.560 --> 00:31:15.520
 >> So the charging platforms that we plan to roll out, not Tesla brand,

00:31:15.520 --> 00:31:18.880
 but they do have cross compatibility with Tesla chargers.

00:31:18.880 --> 00:31:22.360
 So Tesla drivers could make use of those stations.

00:31:22.360 --> 00:31:25.040
 Tesla does provide a pretty strong financial incentive to a lot

00:31:25.040 --> 00:31:27.280
 of their drivers to use their charging stations.

00:31:27.280 --> 00:31:31.480
 That is just something that, you know, plans would need to be adjusted

00:31:31.480 --> 00:31:33.120
 as electric vehicle adoption increases.

00:31:33.120 --> 00:31:37.000
 If 90% of people are getting Teslas and Tesla keeps building out stations,

00:31:37.000 --> 00:31:40.760
 then our involvement might not necessitate developing as many stations.

00:31:40.760 --> 00:31:42.760
 >> But they'd still be pulling from the grid.

00:31:42.760 --> 00:31:43.640
 >> That is correct.

00:31:43.640 --> 00:31:43.920
 >> Yeah.

00:31:43.920 --> 00:31:46.480
 >> And that's where the role of the financial incentives

00:31:46.480 --> 00:31:51.240
 and rate structures would come into play more so.

00:31:51.240 --> 00:32:00.520
 I know with the Tesla that they provide an adapter so that as a Tesla driver,

00:32:00.520 --> 00:32:04.000
 you can use a blinker anyplace else because of the adapter.

00:32:04.000 --> 00:32:08.240
 So I wonder if there might be some leeway from the opposite side of that

00:32:08.240 --> 00:32:13.640
 where a person-- a Tesla adapter could be--

00:32:13.640 --> 00:32:17.360
 a person could have a Tesla adapter so that even though they didn't have a Tesla,

00:32:17.360 --> 00:32:19.160
 they could use a Tesla charging station.

00:32:19.160 --> 00:32:22.600
 I don't know if that's getting into the weeds a little bit I guess.

00:32:22.600 --> 00:32:26.760
 >> I'm not aware of any system that allows for that.

00:32:26.760 --> 00:32:32.400
 Tesla is notoriously kind of protective regarding their charging network,

00:32:32.400 --> 00:32:36.920
 but it's something that would theoretically technically be totally possible.

00:32:36.920 --> 00:32:39.880
 >> Which is why we have to have non-Tesla charging stations

00:32:39.880 --> 00:32:43.000
 because I mean that's proprietary for them.

00:32:43.000 --> 00:32:43.960
 So, yeah.

00:32:43.960 --> 00:32:45.880
 >> You know Steve Jobs on that?

00:32:45.880 --> 00:32:47.800
 >> Yeah. Yes, they did.

00:32:47.800 --> 00:32:53.720
 >> I have a Tesla and it took-- have taken a couple of trips, long trips

00:32:53.720 --> 00:32:58.120
 and the network is incredible, the charging network.

00:32:58.120 --> 00:33:01.520
 And I talked to some people there at a restaurant

00:33:01.520 --> 00:33:04.360
 where they had a-- in Ardmore, Oklahoma.

00:33:04.360 --> 00:33:07.480
 And they loved it because the people would put their cars on the charger

00:33:07.480 --> 00:33:15.160
 and come in and have lunch, have, you know, get coffee and so there are other trickle

00:33:15.160 --> 00:33:21.000
 down economic benefits to this too that I think is real important to stress.

00:33:21.000 --> 00:33:25.840
 >> What do they think the adoption is going to be of the electric vehicles

00:33:25.840 --> 00:33:28.680
 in the next-- let's just say decade now?

00:33:28.680 --> 00:33:35.240
 >> So, in the next decade, it will rely pretty heavily on when that tipping point is reached

00:33:35.240 --> 00:33:40.080
 that the upfront total cost of buying kind of a standard electric vehicle matches

00:33:40.080 --> 00:33:43.800
 and then drops below that of a standard internal combustion engine vehicle.

00:33:43.800 --> 00:33:48.520
 Most industry estimates suggest that that will happen sometime between now and 2025.

00:33:48.520 --> 00:33:52.880
 But since virtually every automaker is at least rolling out one

00:33:52.880 --> 00:33:55.560
 or two electric vehicle models in the next couple model years,

00:33:55.560 --> 00:33:58.160
 it will depend where those price points fall.

00:33:58.160 --> 00:34:01.280
 If in the next couple years, electric vehicles are cheaper

00:34:01.280 --> 00:34:04.120
 than an ICE internal combustion engine car,

00:34:04.120 --> 00:34:07.120
 we might see really dramatic short-term adoption.

00:34:07.120 --> 00:34:11.280
 If it takes until 2025 or 2026 for them to get cheaper, we might be looking at lower levels

00:34:11.280 --> 00:34:13.920
 of adoption within the decade.

00:34:13.920 --> 00:34:18.000
 But a lot of those projections estimate that at least regarding new car sales

00:34:18.000 --> 00:34:21.280
 by 2030, they're looking at somewhere near 10%.

00:34:21.280 --> 00:34:23.760
 >> Oh, okay.

00:34:23.760 --> 00:34:28.080
 >> I'm a big promoter of this stuff.

00:34:28.080 --> 00:34:33.280
 What I found that the upfront cost for Tesla can be considerable depending

00:34:33.280 --> 00:34:35.760
 on how many bells and whistles you have.

00:34:35.760 --> 00:34:42.000
 But the savings in maintenance costs, it's like our last meeting talking

00:34:42.000 --> 00:34:46.240
 about electric powered lawnmowers and how the maintenance costs were

00:34:46.240 --> 00:34:49.520
 so drastically reduced that it made up for the cost.

00:34:49.520 --> 00:34:50.800
 It's the same way with the Tesla.

00:34:50.800 --> 00:34:57.920
 And if you go in price of an SUV, it's got, you know, cup warmers and nose blowers

00:34:57.920 --> 00:35:00.480
 and everything possible.

00:35:00.480 --> 00:35:03.880
 >> Use that a lot.

00:35:03.880 --> 00:35:08.680
 >> I mean, your expenses are guaranteed to stay constant

00:35:08.680 --> 00:35:10.600
 and probably go up your maintenance costs.

00:35:10.600 --> 00:35:16.160
 So in the long run, an electric vehicle, especially now with the extended ranges

00:35:16.160 --> 00:35:18.640
 that they're coming out with, it's just amazing.

00:35:18.640 --> 00:35:20.240
 So that's my plug for it.

00:35:20.240 --> 00:35:20.520
 Thank you.

00:35:20.520 --> 00:35:22.040
 >> They just don't-- they don't rattle as much.

00:35:22.040 --> 00:35:22.280
 I mean, it's true.

00:35:22.280 --> 00:35:23.080
 >> They don't rattle?

00:35:23.080 --> 00:35:23.840
 I have a--

00:35:23.840 --> 00:35:25.000
 >> They don't put a lot of terror on them.

00:35:25.000 --> 00:35:27.120
 >> No, I have a thing on mine where I can actually--

00:35:27.120 --> 00:35:27.800
 >> Quiet.

00:35:27.800 --> 00:35:30.800
 >> Push a button and it sounds like a Ferrari.

00:35:30.800 --> 00:35:41.160
 [ Laughter ]

00:35:41.160 --> 00:35:46.880
 >> I have a question about how we can quantify the actual number of electric vehicles here.

00:35:46.880 --> 00:35:53.440
 And does DMV categorize when it comes time to renew your license?

00:35:53.440 --> 00:35:56.720
 Does DMV ask if it's an electric vehicle?

00:35:56.720 --> 00:36:02.400
 Is there anything in the registration process that ask you if it's an electric vehicle?

00:36:02.400 --> 00:36:03.400
 >> I don't think so.

00:36:03.400 --> 00:36:09.000
 And the reason I'm informed on that is because I keep up on transportation politics a lot.

00:36:09.000 --> 00:36:09.040
 >> No.

00:36:09.040 --> 00:36:10.200
 >> Yeah, right.

00:36:10.200 --> 00:36:14.800
 So, you know, that's another concern is that how are they going to pay for the roads

00:36:14.800 --> 00:36:19.560
 because right now we pay for our roads through fuel tax mostly and oil and gas taxes.

00:36:19.560 --> 00:36:23.160
 So, you know, there's lots of talk about going to a mileage.

00:36:23.160 --> 00:36:27.720
 So when you do register your vehicle at the DMV, you pay a fuel tax on your mileage

00:36:27.720 --> 00:36:29.040
 if you drive an electric vehicle.

00:36:29.040 --> 00:36:31.160
 >> Let's just taxi electrons.

00:36:31.160 --> 00:36:32.840
 >> Yeah, right, taxi electrons.

00:36:32.840 --> 00:36:34.760
 I mean, I don't know how they're going to do it.

00:36:34.760 --> 00:36:37.720
 Because people are going to figure out a way to get around it.

00:36:37.720 --> 00:36:39.640
 They always have.

00:36:39.640 --> 00:36:43.360
 It's like selling your vehicle and saying, "Well, I've sold it for 1500 bucks."

00:36:43.360 --> 00:36:46.240
 When you sold it for 5 grand.

00:36:46.240 --> 00:36:47.240
 >> Charlie, did you have a question?

00:36:47.240 --> 00:36:48.920
 >> I just had a comment.

00:36:48.920 --> 00:36:53.360
 One, it sounds like some of your strategies are centered

00:36:53.360 --> 00:36:58.720
 around having DMV being somewhat involved in the business of charging.

00:36:58.720 --> 00:37:02.680
 It seems to me that we would serve the public better.

00:37:02.680 --> 00:37:05.840
 The logical places for this are all in the private sector.

00:37:05.840 --> 00:37:12.440
 Hotels, movie theaters, restaurants all seem to be really logical places that if

00:37:12.440 --> 00:37:15.840
 that infrastructure is in place, it's good.

00:37:15.840 --> 00:37:19.160
 And I would encourage you to consider rather than throwing rebates

00:37:19.160 --> 00:37:22.760
 to the public sector or to the private sector, excuse me,

00:37:22.760 --> 00:37:26.800
 that you just make it easy to implement the system.

00:37:26.800 --> 00:37:31.120
 That there's a package in place and it has a minimum of approvals and details

00:37:31.120 --> 00:37:35.880
 and zoning and building permits and things like that so that we've got those

00:37:35.880 --> 00:37:41.080
 in parking places where it makes sense to charge as opposed to trying

00:37:41.080 --> 00:37:44.920
 to get the city to do it in public places.

00:37:44.920 --> 00:37:48.240
 The other benefit obviously being those places are paying

00:37:48.240 --> 00:37:51.560
 or generating sales tax, property tax revenue

00:37:51.560 --> 00:37:54.480
 and typically the private sector is going

00:37:54.480 --> 00:37:57.720
 to do things much more efficiently than the public sector.

00:37:57.720 --> 00:38:03.040
 So that would be my encouragement is to get that into existing businesses

00:38:03.040 --> 00:38:07.760
 or new businesses rather than city parks and libraries

00:38:07.760 --> 00:38:10.160
 and places that are exempt from those taxes.

00:38:10.160 --> 00:38:14.880
 >> Yes, and that is something that some jurisdictions have been looking at.

00:38:14.880 --> 00:38:18.240
 One of the hurdles to that development is our jurisdictional monopoly

00:38:18.240 --> 00:38:21.440
 on the sale of electricity within our service territory.

00:38:21.440 --> 00:38:25.840
 So that poses a lot of policy questions whether or not it is legal for private entities

00:38:25.840 --> 00:38:29.640
 to put in their own charger and charge by the kilowatt hour for charging services.

00:38:29.640 --> 00:38:30.600
 But that's something--

00:38:30.600 --> 00:38:33.280
 >> If they're buying it and then selling it, right?

00:38:33.280 --> 00:38:35.120
 They still have to buy it from us.

00:38:35.120 --> 00:38:39.200
 >> That is true and I'm not entirely versed on the policy aspects of that.

00:38:39.200 --> 00:38:45.160
 Perhaps Mr. Littrick or Terry might be better able to speak to that but--

00:38:45.160 --> 00:38:53.280
 >> Yes, so we don't-- so in our service territory,

00:38:53.280 --> 00:38:56.000
 we don't allow anyone to resell electricity.

00:38:56.000 --> 00:39:02.960
 So for this-- for the public policy or the publicly accessible private chargers,

00:39:02.960 --> 00:39:06.600
 all of those chargers that you go use are at no charge.

00:39:06.600 --> 00:39:09.120
 So the businesses are using them to get people in there.

00:39:09.120 --> 00:39:11.800
 So that power that we're selling them is their standard rate

00:39:11.800 --> 00:39:13.440
 that their power is going through.

00:39:13.440 --> 00:39:17.040
 They're not reselling that to their customers.

00:39:17.040 --> 00:39:20.760
 >> Is there a conversation going forward about that issue?

00:39:20.760 --> 00:39:25.400
 >> There could be but that's a can of worms that we have to think

00:39:25.400 --> 00:39:28.240
 about before we open that up is allowing people

00:39:28.240 --> 00:39:31.400
 to resell power in our service territory.

00:39:31.400 --> 00:39:37.720
 >> What would be the can of worms with respect to fixing electric vehicle charging?

00:39:37.720 --> 00:39:40.880
 >> Obviously reselling is a different matter but I'm just talking

00:39:40.880 --> 00:39:44.760
 about the EV charging issue getting the city ordinance or--

00:39:44.760 --> 00:39:46.880
 is it a state ordinance or a city ordinance?

00:39:46.880 --> 00:39:49.360
 >> I believe that would be a state ordinance.

00:39:49.360 --> 00:39:52.960
 That'd be for the PUCT and that'd be a state law.

00:39:52.960 --> 00:39:56.000
 >> Surely, it wouldn't be hard to get that fixed.

00:39:56.000 --> 00:39:59.520
 >> That's the PUCT says we can't resell or people can't resell--

00:39:59.520 --> 00:40:00.400
 >> Correct, correct.

00:40:00.400 --> 00:40:05.080
 That's a-- that's put in place to protect the utilities.

00:40:05.080 --> 00:40:07.640
 And I don't think we want to do that.

00:40:07.640 --> 00:40:08.480
 >> Yeah.

00:40:08.480 --> 00:40:09.800
 >> I'm not talking about in general.

00:40:09.800 --> 00:40:14.040
 I'm talking about public-- charging of public-- of electric vehicles.

00:40:14.040 --> 00:40:18.240
 >> But then I think we'd be in a position

00:40:18.240 --> 00:40:25.560
 where you would have maybe land some tenants, so some landowners or property owners

00:40:25.560 --> 00:40:27.760
 that are, you know, paying electricity at a rate

00:40:27.760 --> 00:40:31.640
 and then really jacking that rate up to their tenants.

00:40:31.640 --> 00:40:33.040
 >> That's my-- that was my next question.

00:40:33.040 --> 00:40:37.960
 I was about to say there are some all bills paid apartment complexes and--

00:40:37.960 --> 00:40:38.360
 >> Correct.

00:40:38.360 --> 00:40:39.160
 >> -- technically they're selling--

00:40:39.160 --> 00:40:40.600
 >> That's how they get around that, yes, sir.

00:40:40.600 --> 00:40:40.960
 Yes, sir.

00:40:40.960 --> 00:40:46.720
 >> My caveat would be for the purposes of vehicle charging, that is a different--

00:40:46.720 --> 00:40:47.600
 >> In public places.

00:40:47.600 --> 00:40:48.200
 >> I agree.

00:40:48.200 --> 00:40:50.920
 We don't want to open that up.

00:40:50.920 --> 00:40:54.960
 But for charging of vehicles, that's kind of a no-brainer.

00:40:54.960 --> 00:41:00.720
 I can't envision any reason to oppose that part of resale.

00:41:00.720 --> 00:41:06.560
 >> I think what we could probably do so there's some hardware issues there.

00:41:06.560 --> 00:41:10.440
 So if we had all of these charging stations that were individually metered,

00:41:10.440 --> 00:41:14.920
 we could easily set up a rate that would promote the EV charging.

00:41:14.920 --> 00:41:16.920
 So that's something that we'll look into.

00:41:16.920 --> 00:41:21.120
 The issue is a lot of these chargers aren't metered individually.

00:41:21.120 --> 00:41:25.280
 So the power that we're selling them is flowing through their main meter on their business.

00:41:25.280 --> 00:41:29.560
 There's not an individual meter on the charger itself.

00:41:29.560 --> 00:41:31.320
 >> Why is that a problem?

00:41:31.320 --> 00:41:34.800
 >> Well, then the rate we'd give them, we don't know if what the power is going

00:41:34.800 --> 00:41:37.720
 to the building or is it going to the charger.

00:41:37.720 --> 00:41:38.840
 So if we wanted to set up a--

00:41:38.840 --> 00:41:40.480
 >> Why do we need to have a special rate?

00:41:40.480 --> 00:41:43.240
 >> If we wanted to set up a special rate, I thought that was your question.

00:41:43.240 --> 00:41:46.840
 If you wanted to set up a special rate to encourage the-- these chargers--

00:41:46.840 --> 00:41:53.240
 >> No, to make it easier, the administrative hassle, the building permits, the zoning clearances,

00:41:53.240 --> 00:41:56.600
 all the things that people fuss about city services.

00:41:56.600 --> 00:41:57.080
 >> Oh, got you.

00:41:57.080 --> 00:41:57.640
 Not on the rate side.

00:41:57.640 --> 00:42:03.240
 >> Right side, I would discourage rebates and special prices.

00:42:03.240 --> 00:42:03.840
 >> We can reach--

00:42:03.840 --> 00:42:05.680
 >> Our prices should be what our prices are.

00:42:05.680 --> 00:42:07.600
 >> I'm sorry, I misunderstood you there.

00:42:07.600 --> 00:42:08.560
 We can reach out to them.

00:42:08.560 --> 00:42:14.560
 We haven't heard any pushback from installers like the Tesla stations

00:42:14.560 --> 00:42:17.600
 and the larger stations do take some electrical infrastructure.

00:42:17.600 --> 00:42:20.480
 But we really haven't heard a big pushback on--

00:42:20.480 --> 00:42:25.520
 from the development community on any hurdles they have on getting those installed.

00:42:25.520 --> 00:42:30.720
 If it comes to us, which would have the big say in that, yeah, we can take the--

00:42:30.720 --> 00:42:35.680
 not the easy road, but we can make sure that there's not any hurdles

00:42:35.680 --> 00:42:39.800
 to these businesses getting these chargers installed.

00:42:39.800 --> 00:42:40.960
 >> I misunderstood you too.

00:42:40.960 --> 00:42:42.120
 >> Yeah.

00:42:42.120 --> 00:42:43.720
 >> Which probably means I misspoke.

00:42:43.720 --> 00:42:44.200
 I apologize.

00:42:44.200 --> 00:42:47.760
 >> It's a Monday morning after daylight savings time.

00:42:47.760 --> 00:42:48.760
 >> That's right.

00:42:48.760 --> 00:42:50.240
 We're all still tired.

00:42:50.240 --> 00:42:50.880
 >> Any other questions?

00:42:50.880 --> 00:42:53.240
 >> Other questions?

00:42:53.240 --> 00:42:53.880
 All right.

00:42:53.880 --> 00:42:56.120
 I guess one thing we do need is direction.

00:42:56.120 --> 00:42:59.640
 So we are taking this on to the council.

00:42:59.640 --> 00:43:02.520
 So just any recommendations you might have?

00:43:02.520 --> 00:43:04.800
 >> So consensus, I--

00:43:04.800 --> 00:43:06.840
 >> Sounds like you guys are ahead of the game here.

00:43:06.840 --> 00:43:07.120
 >> Yeah.

00:43:07.120 --> 00:43:08.080
 >> I appreciate that.

00:43:08.080 --> 00:43:08.480
 >> Okay.

00:43:08.480 --> 00:43:12.200
 >> Yeah. And I'm happy to see that it's being used.

00:43:12.200 --> 00:43:14.800
 So if it wasn't being used, I'd have a different--

00:43:14.800 --> 00:43:18.800
 >> And with the new system, we'll have access to that so the--

00:43:18.800 --> 00:43:21.080
 we can start to gather the data that we're lacking.

00:43:21.080 --> 00:43:24.440
 It's just the blink system is very proprietary to them.

00:43:24.440 --> 00:43:28.040
 We're not able to see other than kilowatt hours used in a month.

00:43:28.040 --> 00:43:29.480
 Once we get this new system,

00:43:29.480 --> 00:43:31.560
 we'll be able to see the individual users.

00:43:31.560 --> 00:43:34.000
 They can track them and then that's--

00:43:34.000 --> 00:43:38.520
 you asked about Austin and their flat rate

00:43:38.520 --> 00:43:40.360
 and San Antonio's flat rate.

00:43:40.360 --> 00:43:43.320
 They're doing that at a loss but they're getting the data.

00:43:43.320 --> 00:43:45.280
 So that's why they're-- that's why they're--

00:43:45.280 --> 00:43:47.320
 >> They're promoting the program that way.

00:43:47.320 --> 00:43:49.480
 >> The data is worth more to them

00:43:49.480 --> 00:43:50.640
 than a little bit of electricity.

00:43:50.640 --> 00:43:53.320
 >> One more question and this is regarding the TURP

00:43:53.320 --> 00:43:54.280
 and it's just occurred to me

00:43:54.280 --> 00:43:57.600
 that in the past we haven't used TURP for the city.

00:43:57.600 --> 00:43:59.280
 Is the reason that we're able to use TURP is

00:43:59.280 --> 00:44:02.680
 because it's DME and it's a public-- and it's a utility?

00:44:02.680 --> 00:44:04.040
 >> I'll have to--

00:44:04.040 --> 00:44:05.480
 >> Because we were unable to--

00:44:05.480 --> 00:44:07.080
 it's my understanding that we were unable to use it

00:44:07.080 --> 00:44:11.240
 as a city to buy equipment in the past, the TURP grants.

00:44:11.240 --> 00:44:12.280
 >> Was that a draft?

00:44:12.280 --> 00:44:13.080
 >> Yeah.

00:44:13.080 --> 00:44:16.800
 [ Pause ]

00:44:16.800 --> 00:44:20.040
 >> So I'm not necessarily familiar with the past history

00:44:20.040 --> 00:44:21.440
 of the TURP program.

00:44:21.440 --> 00:44:22.800
 Myself and one of the other analysts

00:44:22.800 --> 00:44:25.480
 at the energy services team attended a TCEQ workshop

00:44:25.480 --> 00:44:27.880
 on the TURP grant and it was very clear

00:44:27.880 --> 00:44:32.640
 and made abundantly clear that public utilities as well as cities

00:44:32.640 --> 00:44:34.600
 and municipalities themselves are eligible

00:44:34.600 --> 00:44:36.320
 at least for the alternative fueling facilities.

00:44:36.320 --> 00:44:38.080
 >> At least for the--

00:44:38.080 --> 00:44:40.360
 >> Sorry, this aspect of the TURP grants.

00:44:40.360 --> 00:44:41.720
 >> The electrical part?

00:44:41.720 --> 00:44:41.960
 >> Yes.

00:44:41.960 --> 00:44:42.760
 >> Portion then, okay.

00:44:42.760 --> 00:44:44.080
 All right.

00:44:44.080 --> 00:44:47.640
 That's probably-- yeah, that's probably a question for fleet anyway.

00:44:47.640 --> 00:44:48.440
 Thank you.

00:44:48.440 --> 00:44:51.920
 >> One final comment, you outlined several alternatives there

00:44:51.920 --> 00:44:54.080
 that were good and as you go forward,

00:44:54.080 --> 00:44:58.600
 I would just encourage you to pursue all of those alternatives

00:44:58.600 --> 00:45:02.400
 as you think this thing through and not get

00:45:02.400 --> 00:45:03.920
 on one track necessarily

00:45:03.920 --> 00:45:07.600
 because technology change is pretty quick in this area.

00:45:07.600 --> 00:45:08.560
 >> Yes, sir.

00:45:08.560 --> 00:45:10.280
 It's a very fast-moving industry.

00:45:10.280 --> 00:45:13.320
 >> All right, so consensus is to move forward as presented.

00:45:13.320 --> 00:45:14.280
 Is that correct?

00:45:14.280 --> 00:45:16.080
 Okay. All right.

00:45:16.080 --> 00:45:16.680
 >> Thank you very much.

00:45:16.680 --> 00:45:19.360
 >> Thank you, Chase.

00:45:19.360 --> 00:45:20.920
 Well, that is the agenda.

00:45:20.920 --> 00:45:23.040
 Do we have a motion to--

00:45:23.040 --> 00:45:25.720
 >> Adjourn, please.

00:45:25.720 --> 00:45:26.240
 >> Thank you.

00:45:26.240 --> 00:45:29.000
 [ Laughter ]

00:45:29.000 --> 00:45:31.080
 Quit came to mind and I knew that wasn't right.

00:45:31.080 --> 00:45:32.440
 [ Laughter ]

00:45:32.440 --> 00:45:33.000
 >> That's fine.