Nov 18, 2026 Mobility Committee on 2026-11-18 10:00 AM

November 18, 2026 Mobility Committee 409128

Meeting Details
Meeting Date: November 18, 2026
Board: Mobility Committee
Video ID: 409128
Has Transcript: Yes
Has Agenda: Yes
AI Summary by Dentron 3000

Meeting Summary: Mobility Committee Date: November 18, 2026 Location: Council Work Session Room, City Hall, Denton, Texas

1. Approval of Minutes * Item MC26-021: The Committee approved the minutes from the September 30, 2026 meeting.

2. Transportation/Mobility Project Status Report * Item MC26-023: Staff presented updates on major transportation projects. * SH 121/US 287 Corridor: Staff noted that significant traffic disruptions are expected in the first or second quarter of 2027 when main lane construction begins. Staff recommended coordinating with the City’s Public Information Officer (PIO) and Texas Department of Transportation (TxDOT) PIOs to improve public communication regarding traffic control plans. * US 288 Corridor: The project has been divided into three sections. * Section 1 (407 to North of Robson Ranch): Scheduled for a September 2026 let date. * Section 2 (407 South to North of 1171): Scheduled for a Fiscal Year 2028 let date, initially focusing on frontage roads to accommodate development pressure. * Funding: The project is fully funded. Staff are working with TxDOT on right-of-way acquisition costs, as TxDOT’s right-of-way and utility relocation budgets have been reduced. * FM 1173: Negotiations with Crum & Forster (or local entity "Crum") are ongoing regarding parking relocation within the TxDOT right-of-way. The City is exploring purchasing adjacent property to relocate parking, which may delay the schematic approval process. * Outer Loop: Environmental clearance is targeted for Summer 2027, delayed by four months due to federal government shutdown impacts on review agencies. The locally preferred alternative is the southern alignment. * Highway Commission: Staff discussed the potential return to formula-based funding allocations for the Texas Department of Transportation, noting current discretionary funding structures.

3. Capital Projects Communication Outreach * Item MC26-025: Seth Garcia, Director of Capital Projects and Street Operations, presented updates on public communication strategies. * Current Processes: Includes pre-construction public meetings, "Discuss Denton" website updates, and door hangers distributed by contractors. * New Initiatives: * Text Denton: An opt-in text alert system for project-specific updates (road closures, water shutdowns). Piloted during the Neighborhood 2 and 6 projects. * Public Affairs Specialist: The City is hiring a dedicated Public Affairs Specialist for the Capital Projects department to manage "Discuss Denton" updates and coordinate with Marketing and Communications. Interviews are expected to begin after Thanksgiving, with a target start date of January 2027. * Committee Feedback: Members requested that "Discuss Denton" pages include monthly updates even if no major changes occur, and that FAQ sections be maintained to address common questions. Questions were raised regarding multilingual support for text alerts and website content.

4. 2027 Meeting Schedule * Item MC26-026: The Committee reviewed the proposed 2027 meeting schedule, which follows the standard last Wednesday of the month format with adjustments for holidays. * Motion: A motion was made and seconded to approve the 2027 Mobility Committee meeting schedule. * Vote: The motion passed unanimously.

5. Staff Memorandum: Sidewalks and Shade * Item MC26-027: Staff provided updates on the Denton Shopping Center sidewalks and shade additives. * Denton Shopping Center Sidewalks: Staff indicated this project is not a high priority for TxDOT Capital Improvement Program (CIP) funding due to existing sidewalks on the south side, drainage components, and CIP prioritization criteria based on crash fatalities and serious injuries. Staff noted that a prioritized list for City-funded sidewalk and bike lane projects will be presented in December. * Shade Additives: Planning staff explained that new developments are required to plant one shade tree per 30 linear feet of street frontage. The Downtown Denton Plan includes "Cool Streets" initiatives for core pedestrian pathways. Committee members raised concerns about heat safety in established neighborhoods without new development. Staff indicated that broader tree planting initiatives in existing neighborhoods fall under the purview of other departments (e.g., Parks/Environment) but acknowledged the mobility/safety implications. * Future Items Matrix: Staff presented the updated matrix of future items; no action was required.

6. Concluding Items * Personnel Update: Seth Garcia introduced Scott Fettig, the new Deputy Director of Capital Projects, who will assist with construction reports. * Conference Update: A committee member shared insights from the Texas Trails and Active Transportation Conference regarding quick-build projects for pedestrian safety and procurement methods to reduce costs. Staff will follow up to share relevant information.

Agenda Chapters
1. A. MC26-021 Consider approval of the minutes of September 30, 2026.
0:02 - 0:29
2. B. MC26-023 Receive a report and hold a discussion regarding the City of Denton Transportation/Mobility Project Status Report. [Estimated Presentation Time: 30 minutes]
0:29 - 45:57
3. E. MC26-027 Staff Memorandum Denton Shopping Center Sidewalks Shade Additives to Sidewalks Future Items Matrix
45:57 - 54:56
4. 3. CONCLUDING ITEMS
54:56 - 56:35
Transcript
9045 words
[A. MC26-021 Consider approval of the minutes of September 30, 2026.] [B. MC26-023 Receive a report and hold a discussion regarding the City of Denton Transportation/Mobility Project Status Report. [Estimated Presentation Time: 30 minutes]] [00:02:45] >> I WILL JUST TELL YOU THAT IT'S THE WORST PART HASN'T HAPPENED YET, BECAUSE THE MAIN TRAUMA IS WHEN WE COME IN AND DO THE MAIN LANES. SO THEY'RE WORKING TO GET EVERYTHING TO THE OUTSIDE BUILT SO THEY CAN MOVE THE TRAFFIC ONE SIDE AT A TIME. AND REMEMBER, THERE'S GOING TO BE BETWEEN HERE AND 380. THERE'S GOING TO BE NOT ONLY THE MAIN LANES, BUT THE PAVEMENT FOR THE TOLL MANAGED LANES IN THE FUTURE. SO IT'LL BE A IT'S A BIG CHUNK OF ASPHALT THEY'LL BE POURING OUT THERE. SO I DON'T KNOW HOW TO COMMUNICATE IT. BUT I THINK THAT WE NEED TO, AT SOME POINT IN THE VERY NEAR FUTURE, GET A MEETING BETWEEN DENTON'S PIO FOLKS AND TEXAS PIO FOLKS AND JUST LOOK AT THE TRAVEL TRAFFIC. CONTROL CONTROL PLAN SO THAT WE CAN MAKE SURE THAT WE KNOW WHEN THE MORE PROMINENT CHANGES ARE GOING TO HAPPEN BEFORE THEY HAPPEN. >> HELP ME WITH PIO. >> PUBLIC INFORMATION OFFICER. >> OKAY. THANK YOU, >> I, I'M NOT VERY GOOD AT THAT. SO I DON'T KNOW. I DON'T EVEN KNOW HOW TO SPELL THAT. SO, SO THAT I WOULD JUST SUGGEST WE GET THAT ON OUR SCHEDULE IN THE NEAR TERM TO START WORKING SO THAT WE GET MORE TIMELY RESPONSES FROM TXDOT, BECAUSE THEY'LL GIVE YOU A NOTICE LIKE A WEEK OR SO IN ADVANCE. AND ON THE PROJECT OF THIS SIZE, THEY TYPICALLY ARE WILLING TO HELP PROVIDE ADDITIONAL INFORMATION ON MORE TIMELY BASIS TO THE LOCALS. I THINK WE'RE GOING TO QUICKLY GET TO THAT POINT ON THIS PROJECT. >> QUESTION. YES, MA'AM. >> DO YOU HAVE A BALLPARK OF WHEN THE WORST PART IS GOING TO START? >> I THINK IT'S GOING TO BE ABOUT THE FIRST OR SECOND QUARTER OF NEXT YEAR. >> OKAY, THANKS. >> IT JUST DEPENDS ON IF THEY KEEP ON THE SAME SCHEDULE THEY'RE ON RIGHT NOW. ALL I JUST TOLD YOU WAS IN THAT THEY'RE OKAY. >> MAYHILL AND JOHN JUST JUST TO THAT POINT, JUST FOR THE COMMISSION OR THE COMMITTEE'S AWARENESS THAT WILL WORK WITH OUR TRANSPORTATION TEAM AND OUR PUBLIC INFORMATION OFFICER AND MARKETING TO TO GET THAT SET UP. I THINK THAT'S A GREAT [00:05:01] SUGGESTION SO THAT WE GET THE SAME MESSAGING OUT TO FOLKS ON MULTIPLE CHANNELS. >> AND THE DEAL IS, IS IT'S REALLY HARD TO GET PEOPLE'S ATTENTION ON THESE THINGS UNTIL THEY ARE STUCK IN TRAFFIC. ONE OF THE WAYS A COUPLE OF CITIES THAT I WORK WITH HAVE DONE IT BEFORE IS WHEN THEY KNOW SOMETHING MAJOR IS GOING TO HAPPEN IN ADVANCE, THEY FIND IT. IF THEY CAN GET IT IN TIME, THEY PUT IT OUT IN THEIR WATER BILL. I DON'T KNOW IF THAT'S IF THAT WORKS FOR YOU ALL. GOT SOME KIND OF MESSAGING THERE, BUT YES, I WAS HEARING A CONVERSATION WITH MISS PENN BECAUSE SHE WAS SAYING SHE GOT STUCK IN TRAFFIC BECAUSE ALL THIS ON WINDSOR AND EVERYTHING. AND THAT'S CUSTOMARY FOR PEOPLE WHO AREN'T EVEN THIS CLOSE TO IN THE KNOW. THEY GET STUCK IN TRAFFIC AND THEN THEY THEY THINK WE'RE ALL IDIOTS. SO MAYHILL, THIS IS THE NEXT ONE. IS THAT ME DOING THAT? AM I DOING THAT? I DON'T KNOW, IT DOESN'T MATTER. MAYHILL THIS IS THE SAME ISSUE. YOU'LL SEE THAT IF YOU LOOK WHEN YOU'RE DRIVING THROUGH THERE, YOU DON'T REALLY SEE IT ON THE MAIN LANES BECAUSE THEY'RE BUILDING ALL THE FRONTAGE ROADS BEHIND THE DIRT. SO THOSE FRONTAGE ROADS ARE BEING BUILT RIGHT NOW. AND, AND THEN WHAT THEY'LL DO IS THEY'LL SHIFT THE TRAFFIC, THEY'LL DO TEMPORARY PAVEMENT, AND THEN THEY'RE GOING TO COME IN AND START DOING THE MAIN LANES. REMEMBER THAT MAYHILL BRIDGE IS STILL THERE. WHEN WE'RE DONE IT'S GOING TO BE A BRIDGE BIGGER THAN 288 AT GOLDEN TRIANGLE. SO AGAIN THE TRAUMA IN THIS PROJECT IS STILL IN THE FUTURE. SO WHATEVER HOWEVER BAD IT IS NOW AND I LIVE HERE, IT'S BAD. IT WILL GET DECIDEDLY TRAUMATICALLY WORSE. >> YOUR FUTURE IS A FORTUNE TELLER. IS IS A REALLY SKETCHY. RIGHT ON. >> YEAH. I'M NOT. NEGOTIATION IS NOT MY SKILL SET. ALL RIGHT. SO NOW WE GET TO THE, YOU KNOW, RELATIVELY GOOD NEWS. WE HAVE BROKEN THIS PROJECT INTO ESSENTIALLY THREE PROJECTS NOW 407 TO NORTH OF ROBSON RANCH IS PROJECT NUMBER ONE. IT'S SCHEDULED TO HIT A SEPTEMBER LET DATE. HOPE IT SAYS THAT UP THERE. YES IT DOES. YES. THE SECTION FROM 407 SOUTH TO JUST NORTH OF 1171. THAT PROJECT IS ALSO GOING TO BE LET SOMETIME IN FISCAL YEAR 2028, WHICH STARTS SEPTEMBER 27TH. AND IT WILL JUST BE THE FRONTAGE ROADS INITIALLY. SO WE WON'T DO DENTON CREEK, WE WON'T DO CLEVELAND GIBBS. WE'LL JUST DO THE FRONTAGE ROADS BECAUSE WE HAVE A TIMELINE WE HAVE TO HIT FOR FOR SOME DEVELOPMENT DOWN THERE, AND THEY ONLY NEED THE FRONTAGE ROAD. SO WE'RE PUSHING THAT PROJECT. AND HILLWOOD HAS ALREADY STARTED WANTING TO KNOW WHY WE'RE NOT DOING ALREADY. SO I'M CERTAIN THAT'LL GET SOME ATTENTION HERE PRETTY QUICK FROM THE HIGHWAY COMMISSION. BUT THE GOOD NEWS IS FULLY FUNDED AND NOW WE'VE MOVED THEM INTO LET YEARS. AND IN IN THE MIDDLE SECTION ACTUAL LET MONTH THEY WILL HIT THAT LET DATE IN SEPTEMBER. BECAUSE ONCE YOU GET A LET DATE AT TXDOT, THEY DON'T MOVE IT. THEY OH, FOR HEAVEN OR EARTH, THEY MAKE THAT DATE HIT. AND THAT WE'RE WORKING PRETTY CLOSELY ON ALL THE UTILITIES. WE DON'T SEE ANY REAL DIFFICULTY IN HITTING THAT MARK FOR THE MIDDLE SECTION. WE'RE JUST CONTINUING THE DESIGN. ONE OF THE THINGS WE ARE WORKING WITH THE TEXAN ON IS WE'RE GOING TO, AFTER THE FIRST OF THE YEAR, WHENEVER THE DUST SETTLES ON EVERYTHING, BOTH AT THE HIGHWAY COMMISSION AND FOR THE LEGISLATURE, WE'RE GOING TO LOOK TO SEE IF THERE'S A NEED FOR THE COUNTY TO COME IN AND POTENTIALLY START BUYING RIGHT AWAY OR NOT BUYING IT, PROVIDE FUNDING TO THE STATE TO PURCHASE THE RIGHT OF WAY. BECAUSE RIGHT NOW, TXDOT HAS CONSTRUCTION MONEY, BUT THEY DON'T HAVE RIGHT OF WAY AND UTILITY RELOCATIONS FUNDS. THEIR BUDGETS GOT CUT. SO THEY'RE ASKING THE LOCALS THAT WANT TO PARTICIPATE IN ASSISTING THEM IN MOVING THESE PROJECTS FORWARD, TO PUT ASIDE DOING DESIGN FOR NOW, ALTHOUGH WE'RE ALREADY DOING THE DESIGN, BUT TO HELP THEM WITH THE RIGHT OF WAY ACQUISITION. SO WE'RE WE'RE WORKING WITH THEM ON, ON, ON THE COST ON THAT. AND THEN WE'LL GET BACK WITH YOUR STAFF. ON WHAT SECTIONS YOU ALL THINK WE NEED TO START WITH. BECAUSE WE'LL WE'RE NOT GOING TO BE ABLE TO BUY ALL THE RIGHT OF WAY FOR THIS PROJECT BECAUSE IT'S NEW LOCATION. SO YEAH, THIS IS THE. I CAN'T SAY IT IN PUBLIC. SO IT'S A GOOD PROJECT. YEAH. WE STARTED OUT WITH THE ULTIMATE SCHEMATIC BECAUSE THAT'S WHAT TEX-DOT ASKED US TO [00:10:02] DO THE COUNTY. SO WE DID IT. AND THEN WHAT WE'RE TRYING TO DO IS Y'ALL HAVE A LOT OF DEVELOPMENT PRESSURE ALONG THIS CORRIDOR OF 288, AND WE'RE TRYING TO GET SOMETHING THAT WE CAN GET ON THE GROUND FAST. THE ORIGINAL INTENT WAS GO AHEAD AND DO AN ULTIMATE SCHEMATIC, ULTIMATE, WHATEVER, BUT BETWEEN BASICALLY WHERE THE NEW WINDSOR WILL BE ON AROUND TO BONNIE BRAE, TEXAS ASKED US TO GO BACK AND RE LOOK AT BUILDING A SMALLER VERSION OF AN INTERIM JOB WHERE WE ONLY GET THE FRONTAGE ROADS PUT IN WITHIN EXISTING RIGHT OF WAY, WHEREVER MAXIMALLY POSSIBLE. SO THERE'S A COUPLE PLACES WHERE WE'RE GOING TO NEED TO BUY A RIGHT OF WAY, WE THINK, BUT WE ARE TRYING TO GET SOME PROJECTS THAT WE CAN DO THAT ARE INTERIM AND ARE WITHIN EXISTING RIGHT OF WAY SO THAT Y'ALL CAN START, YOU KNOW, THE DEVELOPMENT THAT'S PUSHING OUT Y'ALL'S DOOR. YOU'LL HAVE ACCESS TO THE FRONTAGE ROADS AS OPPOSED TO THE MAIN LANE. SO THAT WAS KIND OF 180 DEGREE INITIALLY. THEY SAID, WE DON'T WANT ANY THROW AWAY, WHICH MEANS YOU DO ULTIMATE. AND THEN THEY CAME BACK AND SAID, WE DON'T WANT YOU TO TOUCH THE MAIN LANES THAT ARE OUT THERE NOW, AND WE DON'T WANT YOU TO BUY ANY RIGHT OF WAY. SO WE HAD TO BASICALLY PUT IT ON A OZEMPIC DIET, YOU KNOW. >> IS THAT BECAUSE OF FUNDING. >> THEY TIME THEY, THEY, THEY WANT TO GET THEY WANT THESE FRONTAGE ROADS IN SOONER THAN LATER. AND IF THEY DO THEM IN AN INTERIM CONDITION. AND THE OTHER REASON IS, IS, IS WHEN YOU LOOK AT THE TOTAL COST OF THAT ULTIMATE, IT WAS LIKE $1 BILLION. AND THEY DON'T HAVE $1 BILLION. SO SORT OF FUNDING, BUT MOSTLY TIMING. >> YEP. >> DO YOU THINK THERE'S ANY POSSIBILITY THAT THIS WOULD GET SPLIT UP LIKE. THE THE PART THAT'S CONNECTING 380 TO 288 MIGHT GET SEPARATED OUT AND FRONTAGE ROAD SEPARATED OUT. >> WHERE WE'RE FOCUSING PRIMARILY IS GOING TO BE BETWEEN JUST WEST OF LOCUST TO TOWARDS KINGS ROAD. THAT AREA IS WHERE YOU HAVE A LOT OF DEVELOPERS THAT ARE LIKE BANGING ON OUR DOOR RIGHT NOW. AND WE'RE, WE'RE HOLDING THEM OFF WITH PITCHFORKS. SO THAT'S THE PRIMARY AREA WE'RE GOING TO BE FOCUSED ON ASSUMING THAT MEETS Y'ALL'S Y'ALL'S DESIRES AS WELL. >> THANKS. THAT THAT SHOULD NOT IMPACT TRAFFIC, SHOULD IT? >> NO. MAYBE AT THE INTERSECTIONS A LITTLE BIT WHEN THEY'RE COMING IN, BUT ABSOLUTELY, THE MAIN LANES WILL STAY WHERE THEY ARE. AND WE'RE SHORTENING THE WE GOT A NEW DESIGN MANUAL IN 24. AND SO OUR GUYS WERE DESIGNING THIS TO THE NEW DESIGN MANUAL. SO THOSE RAMPS WERE ALMOST AS LONG AS THE THE FRONTAGE ROADS. SO THEY'RE GIVING US A DESIGN EXCEPTION TO SHORTEN THE RAMPS SO THAT WE CAN STAY WITHIN THE EXISTING RIGHT OF WAY. A LOT OF MOVING PARTS, BUT YOUR STAFF IS ON TOP OF IT. AND THEN THIS IS AGAIN, THIS IS PROBABLY ONE OF THE BREAKOUTS WE'LL DO TOWARDS THE END OF THIS PROJECT IS THIS TIE IN OF BONNIE BRAE. BUT YES, WE'LL BREAK THAT THE 288 JOB INTO DIFFERENT SECTIONS. 1515 WE THINK THAT THERE'S A CHANCE IN THE AT THE IN THE NEXT UTP TO GET TEXAS TO FOCUS ON THIS BECAUSE. ONCE IT'S CONSTRUCTED, IT'S A, YOU KNOW, 30, 30 YEAR, 40 YEAR ROAD. AND IT'S READY TO GO THE RIGHT AWAY IS ACQUIRED UTILITIES RELOCATED. IT'S ENVIRONMENTALLY CLEARED. WE'RE AT 100% DESIGN. SO AND, AND AT SOME POINT WE NEED TO VERIFY IF Y'ALL ARE STILL INTERESTED BECAUSE IT. PREVIOUS YEARS, THE CITY HAS INDICATED THAT THEY WOULD TAKE IT OFF SYSTEM IF THAT WOULD WHICH WOULD ALLOW YOU TO MANAGE THAT ROADWAY. YOU WANT TO MANAGE IT AS OPPOSED TO WHAT THE STATE REQUIRES YOU TO MANAGE IT. AND IF THAT'S STILL THE CASE, THAT'LL BE A GOOD INCENTIVE FOR TXDOT TO COME UP WITH THE. WHAT IS IT, 69, $70 MILLION TO BUILD IT? FM 1173 WE ARE PURSUING. CONTINUING THIS PROJECT, WE. WE'RE IN NEGOTIATIONS WITH CRUM RIGHT NOW. THEY. THEY LOSE THAT PARKING RIGHT IN FRONT OF THEIR OLD TOWN CITY HALL AREA BECAUSE IT'S IN THE TEXAS RIGHT OF WAY. THEY GOT AWAY WITH THAT YEARS AGO. SO WE'RE LOOKING AT TRYING TO REDESIGN A LITTLE BIT IN CRUM. THAT'S KIND OF DELAYING OUR OUR TIMELINE ON THIS PROJECT A LITTLE BIT BECAUSE AS WE EVERY TIME WE CHANGE THE, THE SCHEMATIC, WE HAVE TO ALSO CALCULATE THE ADDITIONAL COST TO RIGHT AWAY AND JUST COST UTILITIES. AND THEN IT PUSHES OUT THE, THE ENVIRONMENTAL PROCESS. SO ONE OF THE THINGS WE'RE LOOKING AT, I JUST GOT AN [00:15:04] EMAIL THIS MORNING. THEY'RE THEY'RE LOOKING AT, WE'RE LOOKING AT, WE'VE DONE THIS BEFORE ON 1170, ON 377 IN ARGYLL, WHERE WE FIND OFF PROPERTY AREAS TO CONSTRUCT, RECONSTRUCT PARKING THAT WE TAKE. SO YOUR BOND COUNTIES, BOND MONEY CAN'T BE USED FOR ANYTHING BUT ROAD IMPROVEMENTS OR ANYTHING ASSOCIATED WITH ROAD IMPROVEMENTS, UTILITY RELOCATIONS, ETC. SO WE'VE CHECKED WITH OUR BOND COUNSEL AND AT THE COUNTY, AND WE'RE GOING TO LOOK AT PURCHASING A PIECE OF PROPERTY SO THAT THE CITY CAN MOVE THEIR PARKING DOWNTOWN. SO THAT'S WE GOT TO GET THAT WORKED OUT BEFORE WE GET THE SCHEMATIC APPROVED. AND THEN THAT SCHEMATIC IS WHAT WE ENVIRONMENTAL DECLARE. SO WE TOOK A HALF STEP BACK ON THIS PROJECT. AND BUT WE'RE TRYING TO BE SENSITIVE TO THE NEEDS OF THE LOCALS. >> WHAT WILL THAT ROADWAY LOOK LIKE? IS IT FOUR LANES. >> SIX LANES? WE DON'T. IF IT'S A I'M A. YES. SO JUST SO YOU KNOW, DENTON COUNTY GOT BURNED BACK IN EARLY 2000 ON 407, WHERE WE LISTENED TO THE LOCALS SAY WE ONLY WANT FOUR LANES ON 407 THROUGH DOUBLE OAK BARTONVILLE AND ALL THAT WORST MISTAKE WE EVER MADE. THAT ROAD CAN'T EVER BE WIDENED AND IS MOST DESPERATELY NEEDS BE WIDENED. SO WHAT THE COUNTY DECIDED AT THE TIME IS THEY'RE NOT GOING TO SUPPORT ANY WIDENING OF ANY STATE ROADS, LESS THAN SIX LANES. SO IF YOU SEE WE'RE WORKING ON IT IN THE COUNTY, IT'S SIX LANES ARE BETTER. >> INTERESTING. >> BUT WHAT WE'LL DO IS WE'LL BUILD FOUR TO THE OUTSIDE LIKE WE DID 24, 99 ACROSS THE LAKE. THAT'S A SIX LANE ROAD IN THE FUTURE, BUT WE BOUGHT THE RIGHT OF WAY FOR SIX. WE ONLY BUILT FOUR. AND WE STILL DON'T NEED THE FIFTH AND SIXTH LANE YET. AND THE BRIDGE STRUCTURES UNDERPINNINGS, THEY'RE BUILT TO ADD ADDITIONAL LANES IN BOTH DIRECTIONS. SO THAT'S WHAT WE'RE PLANNING ON DOING IS SIX LANES HERE. OUTER LOOP. WE ARE IT SAYS ENVIRONMENTAL CLEARANCE SUMMER 2027. NOW, WHEN THE WHEN WE HAD THAT REALLY LONG SHUTDOWN OF THE OF THE FEDERAL GOVERNMENT, IT AFFECTED THE CORPS OF ENGINEERS AND FHWA AND ALL THESE OTHER ENTITIES. FISH AND WILDLIFE ABILITY TO REVIEW OUR DOCUMENTS. IT PUSHED US ABOUT FOUR MONTHS OUT. SO THAT'S WHY WE'RE NOW IN THE SUMMER OF 27 FOR ENVIRONMENTAL CLEARANCE. BUT WE'RE THINKING IN THE NEXT 60 DAYS OR LESS, WE'RE GOING TO BE ABLE TO PUT OUT PER PROCEDURE FOR ENVIRONMENTAL IMPACT STATEMENT, THE DETERMINATION OF THE LOCALLY PREFERRED ALTERNATIVE, WHICH IS BASICALLY THE SOUTHERN ALIGNMENT. SO IT'S PINK IN THE EAST, I GUESS IT'S PINK. WHAT IS THAT? >> YES. >> I'M GOING TO CALL IT BROWN. >> MOSS, MAUVE. >> MAUVE GUYS ONLY CAN SEE FIVE COLORS. YEAH. SO THE SOUTHERN ALIGNMENT IN THE EAST, THE SOUTHERN ALIGNMENT THROUGH AUBREY NOT THE YELLOW ONE. THE THE ONE ALIGNMENT, THE ONLY CORE, THE ONLY PLACE THE CORE ALLOWS CROSS THEIR PROPERTY IS THAT AT 423. AND THEN. DID I SAY 423? I MEANT 428. AND THEN WE HAD WE'RE WORKING WITH THE PROPERTY OWNER BECAUSE THAT'S ONE PROPERTY OWNER IN THE TWO BLUES THAT THEY GOT TO DECIDE THAT WE WANT TO GO BEHIND THEIR HOUSE OR IN FRONT OF THEIR HOUSE. IT'S A BIG PIECE OF PROPERTY. SO THEY ONCE THEY TELL US WHAT THEY WANT AND THEN WE HIT IT. MULLUM MULLUM MULLUM, I GET MY NAME'S CONFUSED AND WE'RE THE 35 JOB ALREADY ACCOMMODATES WHERE WE'RE PLANNING TO TAKE THEM UNDER IT. THEY EXTENDED SOME SPANS ON THAT BRIDGE STRUCTURE TO ALLOW US TO BE ABLE TO GET UNDER. AND IT'S CONSISTENT WITH WHAT THE COUNTY IS PLANNING ON THE WEST SIDE FOR THEIR EXPO. SO A COUPLE OF MONTHS FROM NOW OR LESS, YOU'LL BE ABLE TO TELL PEOPLE, WE'LL UPDATE OUR COUNTY'S THOROUGHFARE PLAN TO SHOW THAT ALIGNMENT, AND YOU'LL BE ABLE TO TELL PEOPLE WHO IS AND WHO ISN'T IMPACTED BECAUSE A LOT OF PEOPLE HAVE ON THE ROAD ARE STILL REALLY UPSET THAT THAT ALIGNMENT SHOWS. BUT THE FEDERAL GOVERNMENT REQUIRES YOU TO TAKE TWO VIABLE ALTERNATIVES COMPLETELY THROUGH THE EIS PROCESS. ON AN ENVIRONMENTAL ASSESSMENT, YOU ONLY TAKE ONE. SO THAT BASICALLY. PISSES OFF TWICE AS MANY PEOPLE AS YOU NORMALLY WOULD BECAUSE THEY WANT TO BE GONE. THEY DON'T WANT THE ROAD AND WE CAN'T. WE TELL THEM WE'RE PRETTY CERTAIN IT WON'T BE THERE, BUT WE CAN'T SAY FOR SURE UNTIL WE SELECT THE LOCALLY PREFERRED ALTERNATIVE. [00:20:01] THAT'S, I THINK, WHERE I'M AT. THE HIGHWAY COMMISSION. IS THEY'RE REVAMPING BECAUSE OBVIOUSLY THERE'S A WHOLE LOT THAT WENT ON FOR FOR THAT IN THE IN THE STATE, THERE ARE TWO COMMISSIONERS THAT CAN WILL BE APPOINTED BY THE NEW GOVERNOR AND THREE THAT WILL ARE TERMS ARE STILL OPERATIONAL. SO WE'RE WE'RE HOPING THAT THERE MIGHT BE SOME MOVEMENT ON GOING BACK TO FORMULA ALLOCATION, BECAUSE OVER THE YEARS, WHEN ABBOTT WAS GOVERNOR, HE KEPT PULLING MORE AND MORE MONEY AWAY FROM THE LOCAL DISCRETION SIDE AND PUTTING IT AT THE COMMISSION'S AUTHORITY LEVEL SO THAT HE COULD PICK WINNERS AND LOSERS. BACK WHEN PERRY WAS GOVERNOR, HE HAD INSTITUTED A FORMULA ALLOCATION. SO EVERY 2 OR 3 YEARS THE THE STATE WOULD DO A CALCULATION. AND NORTH TEXAS IS 36% OF THE POPULATION, 35% OF THE SALES TAX, 39% OF THE VEHICLE MILES TRAVELED. THEY DO A CALCULATION, AND THERE'S EIGHT METROPOLITAN AREAS, AND THEY TAKE THE FUNDING FOR CATEGORY TWO, FOUR, SEVEN, AND NOT 12, BUT NOW 12, BECAUSE THE COMMISSION PUT ALL THE MONEY IN 12, WHICH IS COMMISSION DISCRETIONARY, AND THEY CALCULATE THOSE PERCENTAGES. SO DALLAS FORT WORTH WOULD GET 3,536% OF THE TOTAL FORMULA ALLOCATION. HOUSTON WOULD GET 29. AND SO YOU KNEW YOU KNEW WHAT YOU WERE GOING TO GET ONCE YOU KNEW THE TOTAL NUMBER, BECAUSE YOU KNEW YOUR PERCENTAGE THAT WENT AWAY UNDER ABBOTT. AND WE'VE BEEN, YOU KNOW, HAMSTRUNG ON THAT FOR A LONG TIME. SO WE'RE THE OUR REGIONAL TRANSPORTATION COUNCIL, WHICH IS NOW THE METROPOLITAN PLANNING ORGANIZATION. IS REALLY LOOKING TO TRY TO GET BACK TO FORMULA ALLOCATIONS. >> WHAT REPLACED THAT FORMULA, HAS ANYTHING POLITICS. >> IT WAS A IT WAS AN INTENT TO GET PEOPLE TO TOE THE LINE, RIGHT? WHATEVER LINE THAT WAS, THEY THEY THEY WANTED YOU TO TOE THE LINE IN ORDER TO GET FUNDING. SO THEY HAD A SO WHEN, WHEN, WHEN, WHEN PERRY LEFT THE CATEGORY 12 COMMISSION, DISCRETIONARY FUNDING HAD JUST UNDER $1 BILLION IN IT. AND THAT'S FOR STUFF LIKE WHEN A HURRICANE HITS IN GALVESTON OR HOUSTON OR WHATEVER, AND THEY HAVE A BRIDGE GETS KNOCKED OVER AND THEY HAVE THE EMERGENCY FUND IT TO GET IT BUILT. THAT WAS WHAT THE COMMISSION DISCRETIONARY WAS SUPPOSED TO DO WHEN THIS LAST UTP, THE. CATEGORY 12, HAD $20 BILLION IN IT. AND THE REASON IT HAD $20 BILLION IN IT IS BECAUSE THE LEGISLATURE, IN AN ATTEMPT TO MINIMIZE THE COMMISSION'S ABILITY TO JUST PUT THE MONEY INTO COMMISSION, DISCRETIONARY AND THEN CHOOSE THEIR OWN PROJECTS, THEY SAID THAT THE COMMISSION COULDN'T PUT MORE THAN 10% OF THEIR BUDGET IN THE COMMISSION DISCRETIONARY ACCOUNT. WELL. THE LEGISLATORS AREN'T THAT SMART AND THEY GOT USE THE WRONG WORDS. AND SO THE COMMISSION AND THE GOVERNOR SAID, OKAY, BUDGET MEANS THE ENTIRE BUDGET, NOT THE CONSTRUCTION BUDGET. RIGHT. THAT'S WHAT THEY WERE TRYING TO GET TO WAS THE CONSTRUCTION BUDGET. SO THAT THE ANNUAL TWO YEAR PROGRAM WAS $200 BILLION. SO THEY PUT 20 BILLION IN. CATEGORY 12. SO WE'RE HOPING THERE'S SOME REMEDIAL WORK ON THAT IN JANUARY. SO ALL THAT TO SAY, THERE'S A LOT OF DUST GOT TO SETTLE. THERE'S A LOT OF THINGS THAT ARE ON THE MOVE, AND I THINK IT BEHOOVE US AT SOME POINT, ONE OF THESE MEETINGS SCHEDULED, NOT JUST AN UPDATE ON THE REPORTS, BUT AN UPDATE ON THE STRUCTURAL CHANGES WE SEE IN AUSTIN THAT COULD IMPACT THESE ROADS. >> OKAY. >> AND THAT'S I'M DONE. >> A NOTE OF THAT. THANK YOU. >> THANK YOU. >> ANY QUESTIONS? ANY QUESTIONS OF MR. POLLSTER? >> I'M WILLING IT. >> IT WORKED. >> THANK YOU. NEXT IS ITEM CPC26-025. RECEIVE REPORT AND HOLD A DISCUSSION REGARDING CAPITAL PROJECT PROJECTS, COMMUNICATION OUTREACH. GOOD MORNING. >> GOOD MORNING, CHAIR COMMITTEE MEMBERS SETH GARCIA, DIRECTOR OF CAPITAL PROJECTS AND STREET OPERATIONS. SO THIS HAS BEEN A LITTLE WHILE COMING. I'M EXCITED TO TELL YOU ABOUT THINGS THAT WE'VE BEEN DOING AND THEN SOME NEW THINGS THAT ARE COMING IN THE FUTURE FOR CHANGES TO OUR DEPARTMENT, WITH HOW WE'RE GOING TO IMPROVE OUR COMMUNICATION, OUTREACH, OR ATTEMPT TO DO SO. SO I WANTED TO KIND OF START OFF WITH WHAT OUR CURRENT PROCESS LOOKS LIKE. SO DURING PRE-CONSTRUCTION [00:25:04] COMMUNICATIONS, WE HEAVILY RELY ON DISCUSSED DENTON ON OUR DISCUSSED DENTON PAGE, YOU'LL BE ABLE TO FIND INFORMATION ABOUT WHAT THE PROJECT SCOPE IS, TENTATIVE TIMELINES, AND DURING OUR UPDATES, WE TRY TO PROVIDE THOSE AT VARIOUS MILESTONES. SO WHETHER THAT BE A 30, 60, OR 90% DESIGN, WHEN WE'RE MOVING INTO LARGE PHASES OF THE PROJECT, WHETHER THAT BE RIGHT OF WAY ACQUISITION, FRANCHISE UTILITY RELOCATIONS, WE WANT TO BE ABLE TO GIVE THE PUBLIC A, HEY, WE'RE STILL WORKING ON THIS, BUT YOU'RE NOT SEEING US YET IN CONSTRUCTION. THE OTHER BIG PRE-CONSTRUCTION PROCESS THAT WE DO IS WE HOLD A PRE-CONSTRUCTION PUBLIC MEETING. THIS IS TYPICALLY CONDUCTED AFTER CONTRACT AWARD. AND SO AT THAT MEETING, AGAIN, WE'RE GOING TO GO THROUGH THE SCOPE, THE SCHEDULE, THE BUDGET. WHEN WE ACTUALLY HAVE A CONTRACTOR SELECTED. AND MOST IMPORTANTLY, WE'RE GIVING OUT CONTACT INFORMATION. THAT CONTACT INFORMATION IS GOING TO BE CONTRACTOR CONTACTS, WHO YOUR PROJECT MANAGER IS, WHO INSPECTIONS PERSONNEL WILL BE THAT WILL BE OUT THERE EACH AND EVERY DAY. SO AGAIN, THAT'S A GREAT TOUCH POINT FOR RESIDENTS WHO ARE GOING TO BE IMPACTED BY THE PROJECT DIRECTLY, NOT TRAVELING PUBLIC, BUT YOU LIVE ON A ROADWAY. WE'RE RECONSTRUCTING. WE'RE TRYING TO GET THAT COMFORT, THAT CONTACT INFORMATION IN YOUR HAND BEFORE WE START. NEXT, WE MOVE INTO KIND OF OUR CONSTRUCTION COMMUNICATION. SO AGAIN, HEAVY PUSH THE LAST COUPLE YEARS TO GET PEOPLE TO GO TO DISCUSS DENTON. THERE YOU HAVE OUR PROJECT MANAGER CONTACT INFORMATION THAT YOU CAN REACH OUT DIRECTLY. SO WE, I WOULD SAY THAT'S PROBABLY THE MOST PRIMARY WAY THAT WE GET REACHED OUT TO DURING CONSTRUCTION PROCESS. WE ALSO, IN OUR SPECIFICATIONS, REQUIRE OUR CONTRACTORS TO PUT OUT DOOR HANGERS. SO A DOOR HANGER IS AGAIN, SOMETHING THE LITTLE THINGS THAT YOU MAY HAVE GOTTEN THEM ON YOUR DOOR BEFORE. WE'RE ACTUALLY LOOKING TO INCREASE THE FREQUENCY OF HOW OFTEN THOSE GO OUT TO WHERE GENERALLY IT'S AT THE START OF CONSTRUCTION, OR IF WE DEMOBILIZE AND COME BACK TO DO A DIFFERENT SCOPE OF WORK, YOU'LL YOU'LL GET ONE OF THOSE WITH NEIGHBORHOOD TWO AND SIX. WE ACTUALLY PILOTED A NEW PROGRAM TO WHERE EVERY TIME WE WERE BRINGING IN A NEW CREW THAT WAS PERFORMING A DIFFERENT SCOPE OF WORK, WE WERE PROVIDING A NEW DOOR HANGER. THIS WAS GIVING KIND OF PHASE SPECIFIC PROJECT INFORMATION THAT WAS, HEY, WE'VE TRANSLATED FROM THE UTILITY PHASE TO THE ROADWAY WORK. SO HERE'S OUR TIMELINE FOR SUBGRADE AND CONCRETE. IT SEEMED TO GET SOME GOOD FEEDBACK. SO WE'RE GOING TO CONTINUE TRYING THAT WITH OUR NEIGHBORHOOD REPLACEMENT PROJECTS. AGAIN, JUST WITH THE GOAL OF GIVING PEOPLE REALISTIC EXPECTATIONS OF NOT GENERAL PROJECT TIMELINES. BUT HERE'S WHAT YOU'RE GOING TO SEE OVER THE NEXT 30 DAYS OR 60 DAYS AS WE MOVE THROUGH THE VARIOUS PHASES. ANOTHER THING THAT WE'VE BEEN PILOTING WITH OUR MARCOM GROUP IS OUR TEX DENTON PLATFORM. SO I'LL GET INTO THAT A LITTLE BIT MORE HERE IN A FUTURE SLIDE. BUT ESSENTIALLY WHAT WE'RE LOOKING FOR IS MAJOR UPDATES, ROADWAY CLOSURES, WATER SHUTDOWNS. SO AGAIN, IT'S GOING TO BE A BRIEF COUPLE LITTLE SENTENCES WITH A LINK TO OUR DENTON PAGE. WE'RE NOT TRYING TO SPAM PEOPLE WITH A BUNCH OF OF TEXT MESSAGES, BUT IT CURRENTLY IS AN OPT IN SYSTEM THAT I'LL GET INTO, LIKE I SAID IN THE NEXT COUPLE SLIDES. BUT AGAIN, JUST TRYING TO PROVIDE ANOTHER OPPORTUNITY TO GET INFORMATION OUT TO THE GENERAL PUBLIC. AND THEN LASTLY, IN THE PAST, WE'VE DONE DIFFERENT PROJECT VIDEOS AND SOCIAL MEDIA POSTS FOR VARIOUS LANE CLOSURES OR BIG PROJECT UPDATES. WE'RE GOING TO BE LOOKING TO PARTNER WITH MARCOM AND DO SOME MORE OF THOSE, NOT ONLY FOR THOSE PIECES, BUT ALSO TO TELL SOME OF THE GREAT WORK THAT OUR GROUP IS DOING. SO AGAIN, MORE INFORMATIONAL AND HORROR STORIES THAN, HEY, WE'RE ABOUT TO FLIP ALL THE TRAFFIC AROUND AND GET EVERYBODY CONFUSED AND UPSET. >> SO PARDON ME, WHAT? WHAT RANGE ARE DOOR HANGERS DISTRIBUTED AROUND A GIVEN CONSTRUCTION PROJECT? >> GREAT QUESTION. SO TYPICALLY THEY'RE DISTRIBUTED TO ANYBODY DIRECTLY IMPACTED. AND THEN POTENTIALLY LIKE THE CORNER HOUSES ON ADJACENT STREETS THAT MAY HAVE A DRIVEWAY CONNECTION OR SOMETHING. ONE OF THE PIECES THAT WE WE MISS OUT ON QUITE FREQUENTLY IS IF YOU LIVE ONE BLOCK OVER, SO YOU'RE GOING TO BE DRIVING THROUGH THE CONSTRUCTION SITE, BUT YOU'RE NOT NECESSARILY GETTING THE DOOR HANGER THAT WE'RE WORKING IN FRONT OF YOUR HOUSE. SO THAT'S ONE OF THOSE AREAS THAT WE'RE TRYING TO GET MORE TEXT UPDATES OUT FOR PEOPLE TO SIGN INTO. SO YOU'RE AWARE OF WHAT'S GOING ON, MAYBE ONE, TWO, THREE STREETS ADJACENT TO YOU THAT COULD IMPACT YOUR TRAVEL. >> OKAY. AND IS THAT SOMETHING THE DISTRIBUTION, ACTUAL DISTRIBUTION, IS THAT DONE IN HOUSE OR DOES THE CONTRACTOR DO THAT? >> SO WE'VE DONE IT BOTH WAYS. RIGHT NOW IT'S CURRENTLY REQUIRED FOR THE CONTRACTOR TO DO IT. AND WE HAVE OUR INSPECTION STAFF MONITOR AND MAKE SURE THAT THEY'RE ACTUALLY PASSING THOSE OUT 48 HOURS IN ADVANCE OF WORK HAPPENING. >> OKAY. VERY GOOD, VERY GOOD. >> OKAY, SO A LITTLE BIT ABOUT TEX DENTON. SO THIS IS OUR NEW CITY WIDE INFORMATION SYSTEM. [00:30:07] AS YOU CAN SEE THERE. WE DO CITY WIDE ALERTS AND NEIGHBORHOOD ALERTS. YOU CAN GO INTO THE CITY OF DENTON.COM/TEX DENTON THAT I'M GOING TO GET INTO ON THE NEXT SLIDE AND SIGN UP FOR VARIOUS DIFFERENT THINGS. ONE OF THE THINGS THAT WE WANT TO FOCUS ON IS THOSE PROJECT BASED ALERTS. SO YOU'RE ABLE TO GO IN AND SIGN UP FOR, FOR INSTANCE, WE JUST FINISHED UP NEIGHBORHOOD TWO AND SIX. YOU CAN SIGN UP FOR SPECIFIC NEIGHBORHOOD TWO AND SIX PROJECT ALERTS. AND SO THAT'S WHEN WE HAVE A NEW ROADWAY CLOSURE, A SIGNIFICANT CHANGE OR POTENTIALLY A WATER SHUTDOWN THAT'S GOING TO IMPACT YOUR AREA. YOU'LL GET A TEXT MESSAGE, AGAIN, WITH A COUPLE OF SENTENCES THAT SAYS THE WORK THAT'S HAPPENING, AND THEN A LINK TO EITHER DISCUSS DENTON OR SOME OTHER MULTIMEDIA FORM THAT'S GOING TO TELL YOU WHAT MORE INFORMATION ABOUT WHAT THE TEXT MESSAGE SAYS. SO AGAIN, I MENTIONED CONSTRUCTION UPDATES AND ROADWAY WORK NOTIFICATIONS. WE'RE GOING TO GET INTO HOLIDAY CLOSURES AND SPECIAL OPERATING HOURS FOR CITY FACILITIES AND OTHER THINGS, CITYWIDE EVENT INFORMATION. SO THERE'S A LOT OF CAPABILITIES JUST OUTSIDE OF PROJECT INFORMATION THAT WE'RE WORKING WITH MARK ON, ON TO GET CITYWIDE ALERTS OUT. SO HERE'S THAT INFORMATION. I'M GOING TO PLUG IT AND DISCUSS DENTON IN THIS PRESENTATION JUST FOR THE VIEWERS IN CASE ANYBODY WANTS TO SIGN UP. SO THAT TO GET THE CITYWIDE ALERTS, YOU CAN TEXT THE WORD DENTON TO THE PHONE NUMBER THAT YOU SEE THERE, OR YOU CAN GO TO THAT LINK AND SEE ALL THE DIFFERENT NEIGHBORHOODS, PROJECTS, INFORMATION TO GET SIGNED UP FOR. AGAIN, THIS DID NOT REPLACE OUR ALERT. DENTON, OUR EMERGENCY NOTIFICATION. SO ALWAYS WANT TO HIGHLIGHT THAT THEY ARE TWO SEPARATE SYSTEMS THAT YOU WOULD NEED TO SIGN UP INDEPENDENTLY FOR. >> YES, MA'AM. >> YES, MA'AM. >> SO DO YOU HAVE ANY IDEA HOW MUCH UPTAKE THERE'S BEEN ON TEXT DENTON SO FAR? >> I DO NOT, I CAN I CAN TRY AND FIND OUT THOSE METRICS AND SEE WHAT WE GOT FOR TWO AND SIX. >> I CAN ASK KAYLA. YEAH. SHE PROBABLY KNOWS. HAVE HAVE YOU ALL HAS YOUR TEAM DONE ANY ALERTS THROUGH OR NOT ALERTS, NOTIFICATIONS THROUGH TEXT. AND YET. >> WE DID SO TOWARDS THE END OF NEIGHBORHOOD TWO AND SIX. WE DID PILOT IT WITH THE FEW PEOPLE THAT WE HAD SIGNED UP. WE GOT SOME GOOD FEEDBACK FROM THOSE THAT WERE THERE. AGAIN, I THINK ONE OF THE THINGS THAT WE'RE LOOKING AT IS HOW TO GET MORE INFORMATION OUT THERE, BECAUSE IT IS AN OPT IN SYSTEM TO GET PEOPLE SIGNED UP. SO WE'RE GOING TO BE ABLE TO NOW IN THOSE PRE-CONSTRUCTION MEETINGS BEFORE CONSTRUCTION STARTS, HAVE THAT INFORMATION AND BE ABLE TO PROVIDE THAT TO ALL THE RESIDENTS. AND IN THE POSTCARDS SAYING, IF YOU'RE NOT ABLE TO ATTEND THE MEETING BUT YOU WANT TO RECEIVE THE NOTIFICATIONS, HERE'S THE TEXT DIDN'T SPOT AND THEN TRY AND GET MORE INFORMATION OUT THAT WAY. >> GOTCHA. AND I GUESS IT'S PROBABLY A LITTLE TOO EARLY FOR YOU TO KNOW KIND OF WHAT THE CHALLENGES ARE Y'ALL ARE HAVING WITH TEXTING BECAUSE IT'S NOT, IT'S NOT GOING TO BE A PERFECT SYSTEM. SO HAVE Y'ALL RUN INTO ANY CHALLENGES BESIDES JUST NOT HAVING MANY PEOPLE SIGNED UP? >> THE SO THE BIGGEST THING THAT WE HEARD FROM KIND OF THE LITTLE FOCUS GROUP THAT WE HAD WORKED ON, IT WAS, WE DON'T WANT TO SPAM PEOPLE WITH TOO MANY THINGS. SO KEEPING IT TO REALLY RELEVANT, PERTINENT INFORMATION LIKE THIS IS A NEW ROAD CLOSURE OR THIS IS A WATER SHUTDOWN, AND NOT JUST GENERAL UPDATES THAT WE CAN GET FROM DISGUST. DENTON. AGAIN, WE'RE HOPING THAT THAT WILL KEEP PEOPLE REGISTERED IN THE PROGRAM AND NOT, HEY, I'M CONSTANTLY GETTING SPAMMED BY UPDATES THAT I DON'T WANT. >> RIGHT. I THINK THAT'S A GOOD APPROACH BECAUSE, YOU KNOW, FOR PERTINENT, IMMEDIATE, MORE URGENT TYPES OF THINGS, YES, TEXT ME. BUT OTHERWISE I'M SIGNED UP FOR THE EMAILS THROUGH DISGUST. AND WHEN THOSE UPDATES COME OUT, WHICH IS LESS URGENT TO ME. SO I THINK THAT MAKES SENSE. THANKS. >> YES, MA'AM. >> THIS IS GREAT. I'M I'M EXCITED TO SEE, YOU KNOW, THE OUTREACH I THINK HAS BEEN REALLY HELPFUL. I KNOW THAT OUR WEBSITE HAS OPTIONS FOR DIFFERENT TRANSLATIONS. AND I WAS CURIOUS IF THERE IS AN OPTION FOR FOLKS, IF THEY ARE SIGNING UP FOR THE TEXTING, IF THEY CAN GET THAT IN ANOTHER LANGUAGE, IS THAT A POTENTIAL THING WE COULD DO? >> JUST THAT IS A GREAT QUESTION. I WILL FIND OUT. I DO NOT KNOW THE ANSWER, BUT WE'LL GET WITH MARKETING COMMUNICATIONS AND FIND OUT. >> YEAH, I THINK AND I'M TRYING TO THINK, I DON'T KNOW IF THE SIGNS OR THE DOOR HANGERS. I FEEL LIKE SOMETIMES THE DOOR HANGERS ARE SOMETIMES ALSO IN SPANISH. THEY ARE. OKAY, GOOD. SO I JUST WOULD SAY I WOULD ENCOURAGE I MEAN, SPANISH IS A IS A MAJOR OTHER LANGUAGE HERE, BUT WE ALSO HAVE, I THINK IT WOULD BE HELPFUL TO, FOR THE CITY TO POSSIBLY OFFER OTHER LANGUAGES, IF THAT'S SOMETHING THAT THAT WE COULD SEE IF THAT'S HELPFUL. >> NO, ABSOLUTELY. >> OKAY. GREAT. >> THANKS. I'LL PASS THAT ALONG. OKAY. OKAY. DISCUSS DENTON. SO AGAIN, THIS IS OUR ONLINE PLATFORM. TYPICALLY EACH PROJECT WILL HAVE A PROJECT PAGE THAT WILL GIVE AGAIN RELEVANT INFORMATION TO THE SCOPE, THE SCHEDULE, THE BUDGET OF WHAT WE'RE LOOKING AT FOR SPECIFIC PROJECTS, AND MOST IMPORTANTLY, CONTACT INFORMATION FOR IF YOU'RE EXPERIENCING AN ISSUE, HERE'S THE PROJECT MANAGER THAT'S WORKING ON IT. YOU ALSO HAVE THE OPPORTUNITY TO SUBMIT [00:35:04] QUESTIONS AND VIA EMAIL. OUR OLD ONE USED TO HAVE A REALLY NEAT FEATURE THAT WHERE YOU COULD ASK THE PM A QUESTION DIRECTLY ON THERE AND WE COULD WE COULD GET THAT. WE'VE LOST A LITTLE BIT OF THAT FUNCTIONALITY WITH THE NEW PLATFORM, BUT AGAIN, CONTACT INFORMATION WITH PHONE NUMBERS, EMAILS, AND A PICTURE OF THE PROJECT MANAGER. LIKE I SAID EARLIER, THIS IS ONE OF THE WAYS THAT WE GET THE MAJORITY OF COMMENTS, CONCERNS, COMPLAINTS, ESPECIALLY WHEN WE'RE NOT IN CONSTRUCTION, IS THROUGH OUR DISCUSSED DENTON SITE. AGAIN, YOU CAN SIGN UP TO GET LIKE COUNCIL MEMBER RUMOHR SAID UPDATES EVERY TIME THAT WE PUT AN UPDATE ON THERE. YOU CAN ALSO SIGN UP ON THE MAIN PAGE TO GET ANY UPDATES. SO IF YOU. IF YOU SIGN UP ON THE MAIN PAGE, YOU'LL GET ANY TIME A AN UPDATE IS POSTED THAT WILL COME TO YOU. OTHERWISE YOU HAVE TO GO TO YOUR PROJECT SPECIFIC PAGE AND SIGN UP FOR THOSE ALERTS. THERE. AGAIN, SOME OF THE BENEFITS. THIS IS ONE CENTRALIZED SOURCE FOR PROJECT INFORMATION. OUR GOAL IS TO INCREASE TRANSPARENCY AND ACCESSIBILITY, AND THEN JUST GET MORE COMMUNITY AWARENESS OUT THERE. AND ENGAGEMENT. >> JUST HAD A FOLLOW UP QUESTION. YES, MA'AM. SO I THINK THIS IS WONDERFUL AS WELL. LIKE YOU SAID, WITHOUT, I NOTICED THAT CHANGE WITHOUT SEEING LIKE PUBLIC COMMENTS. IN SOME WAYS THAT COULD BE CHALLENGING, I'M SURE FOR STAFF FOR TO SEE SOME COMMENTS. BUT I THINK AS A NEIGHBOR, SOMETIMES THAT COULD BE ENCOURAGING TO SEE LIKE, OH, SOMEONE ELSE HAS ALREADY ASKED THAT QUESTION. OR THERE ARE A LOT OF FOLKS ASKING THE SAME QUESTION. IS THERE A WAY? IS THERE A WAY? I GUESS NOW, SINCE IT'S JUST MOSTLY GOING TO EMAIL, HOW IS THERE A WAY THAT PEOPLE COULD SEE, LIKE, WHAT KINDS OF QUESTIONS ARE BEING ASKED OR WHAT ANSWERS? AND I NOTICED ON LIKE THE SAFE ROUTES TO SCHOOL, YOU'VE GOT THE FAQ ON THERE. SO IS THAT, IS THAT KIND OF HOW YOU'RE ADDRESSING THOSE QUESTIONS SO THAT PEOPLE COULD SEE KIND OF AN UPDATE? YEAH. OKAY. >> YEAH. SO I'M GOING TO PASS IT TO MEGAN DAVIDSON, OUR CAPITAL PROJECTS ADMIN MANAGER. >> OKAY. AWESOME. >> HI. MEGAN DAVIDSON CAPITAL PROJECTS ADMINISTRATION MANAGER. SO THE COMMENTS THAT WE USED TO HAVE WERE, YOU USED TO BE ABLE TO ASK THE PM. WE ARE STILL WORKING THROUGH THAT PROCESS WITH MARKETING AND COMMUNICATIONS. THAT IS SOMETHING THAT WE ARE WANTING THIS NEW DISCUSSED DENTON TO HAVE AVAILABLE. THE CURRENT ISSUE WITH THE SYSTEM IS THAT IT IS NOT NOTIFYING THE PROJECT MANAGER WHEN ANYONE COMMENTS OR ASKS A QUESTION. SO IT'S BETTER RIGHT NOW TO MANAGE THOSE QUESTIONS COMING IN DIRECTLY TO THE PM. BUT THE FAQ. THAT WAS A VERY INFORMATIVE MEETING AND A LOT OF QUESTIONS DID COME OUT OF THAT, BOTH DURING THE MEETING AND AFTER. AND SO THAT IS WHY THE PROJECT MANAGER DID THE FAQ PAGE. SO I DO THINK FOR THE TIME BEING, THAT'S PROBABLY A GOOD OPTION FOR US TO CONTINUE WITH. >> I THINK THAT MAKES SENSE. I THINK THAT'S HELPFUL THAT I WOULD JUST. >> I THINK THAT'S HELPFUL FOR NOT ONLY THE NEIGHBORS OR PEOPLE WHO ARE INTERESTED TO SEE. HOPEFULLY THEY'LL GO THROUGH AND SEE LIKE, OH, THIS HAS ALREADY BEEN ANSWERED AND THAT SAVES STAFF TIME. AND I THINK THAT THAT THAT'S, THAT'S HELPS WITH THE TRANSPARENCY PART OF LIKE, OKAY, WE'VE PEOPLE, THE CITY IS AWARE THAT THIS IS A QUESTION THAT PEOPLE HAVE. SO I THINK THE FAQ, WHETHER OR NOT THE COMMENT THING WORKS OUT, I THINK THE FAQ IS JUST, I THINK HAVING THE TEXT ON THERE, BECAUSE THEN PEOPLE COULD EVEN SEARCH IT AND MAYBE IT'LL POP UP. SO I'M ALL FOR THAT. AND I WOULD JUST SAY AGAIN, MAKING SURE I HAVEN'T CHECKED, BUT MAKING SURE THAT DISCUSSED DENTON IS ACCESSIBLE IN OTHER LANGUAGES AS WELL WOULD BE GOOD. YES. >> ANYONE ELSE? YES. YES, MA'AM. >> I LOVE DISCUSSED DENTON. IT'S ALWAYS THE FIRST PLACE I GO. WHEN I GET A QUESTION, I SEE CAN I ANSWER IT BASED ON DISCUSSED DENTON. SO BASED ON THAT EXPERIENCE, WHAT I. ONE THING THAT WOULD BE HELPFUL IS IT. ONCE A PROJECT HAS BEGUN. SO IT'S UNDER CONSTRUCTION OR THERE'S ACTIVE WORK HAPPENING. IF THERE WAS A MINIMUM OF MONTHLY UPDATES, EVEN IF THERE'S NO UPDATE, IT'S NICE TO KNOW THERE'S A DELAY. AND HERE'S WHY, RIGHT? BECAUSE THAT WAY IF I GET A QUESTION, I CAN JUST GO THERE AND SEND IT TO THE PERSON, OR THEY CAN BE SIGNED UP FOR NOTIFICATIONS. BUT IN THOSE MONTHLY UPDATES, I THINK WHAT THE COMMUNITY GENERALLY WANTS TO KNOW IS WHAT'S HAPPENING RIGHT NOW, WHAT'S ABOUT TO HAPPEN AND WHEN. SO THE WINDS AND I KNOW THINGS CAN SHIFT, BUT YOU CAN ALWAYS PUT IN LANGUAGE OF APPROXIMATELY, YOU KNOW, THIS TIME RANGE, SOMETHING LIKE THAT. SO MINIMUM MONTHLY, I DO APPRECIATE THE NEIGHBORHOOD TWO AND SIX THAT THAT WAS EVERY OTHER EVERY OTHER WEEK, EVERY OTHER WEEK THAT THAT WAS GOOD FOR THAT PROJECT. BUT I THINK MOST MONTHLY IS GOOD ENOUGH. AND THE ONLY OTHER THING IS THERE'S BEEN A COUPLE TIMES I'VE GONE INTO SOME PROJECTS TO TRY TO ANSWER A QUESTION, AND I DIDN'T FIND ANY TIMELINE OR THE TIMELINE WAS WAY OFF OR SOMETHING LIKE THAT. SO IF POSSIBLE, INCLUDING DOCUMENTATION OF THE TIMELINE, BONUS POINTS IF WE HAVE A MORE DETAILED TIMELINE. SO I THINK ON NEIGHBORHOOD TWO AND SIX, I DUG THROUGH A CONTRACT AND FOUND THE VERY DETAILED TIMELINE. AND IT'S A [00:40:02] COMPLICATED DOCUMENT TO LOOK AT, BUT IT HELPED ME TO UNDERSTAND, LIKE WHEN CERTAIN ROADS WERE ANTICIPATED FOR CONSTRUCTION, ALL THE WORK THAT WAS GOING TO HAPPEN. AND SO THAT MAY BE TOO COMPLICATED TO PUT OUT IN THE PUBLIC LIKE THAT. SO THAT, YOU KNOW, I'LL LET STAFF KIND OF DECIDE THAT. BUT IF WE HAVE SOMETHING A LITTLE MORE DETAILED OF WHEN SPECIFIC WORK IS INTENDED TO HAPPEN BASED ON WHAT THE CONTRACTOR PROPOSED, I FIND THAT HELPFUL BECAUSE I KEEP CLICKING ON THE CONSTRUCTION PLANNING DOCUMENT UNDER SUPPORTING DOCUMENTS, AND IT'S JUST A GENERIC, NOT A PROJECT SPECIFIC DOCUMENT. AND I KEEP THINKING THAT'S WHAT'S GOING TO BE IN THERE. OKAY. BUT OTHERWISE IT'S BEEN REALLY GREAT AND I'M GLAD THAT YOU ALL ARE STILL KIND OF TRYING TO WORK THROUGH SOME OF THE FUNCTIONALITY AND MAKE IT AS, AS GOOD AS POSSIBLE. BUT I THINK THIS IS A REALLY GREAT TOOL. >> AWESOME. THANK YOU. THANK YOU FOR THE FEEDBACK. OKAY, SO JUST REALLY QUICK AGAIN, HERE IS WHERE YOU CAN GO TO SUBSCRIBE AGAIN ON THAT IMPROVING DENTON.COM. YOU CAN SUBSCRIBE AT THE BOTTOM OF THE FIRST PAGE TO GET ALL OF THOSE UPDATE EMAILS. OR YOU CAN GO TO THE PROJECT SPECIFIC PAGES AND SIGN UP JUST FOR THE PROJECTS THAT YOU ARE CONCERNED ABOUT. AND SO LASTLY, I JUST WANTED TO TALK ON SOME PROCESS UPDATES, SOME THINGS THAT WE'RE DOING TO IMPROVE THIS GOING INTO THE NEXT YEAR, SOME OF THE GOALS FROM THE DEPARTMENT. SO ONE OF THE THINGS THAT WE'RE CURRENTLY WORKING ON IS WE HAVE RECLASSED, A VACANT FTE TO BE A DEDICATED PUBLIC AFFAIRS SPECIALIST FOR CIP THAT IS NOW GOING TO BE HOUSED UNDERNEATH US AND WORK IN CLOSE COORDINATION WITH MARKETING AND COMMUNICATIONS. SO FOR THOSE OF YOU THAT DON'T KNOW RIGHT NOW, ALL OF OUR INDIVIDUAL PROJECT MANAGERS RUN THEIR OWN PAGES ON DISCUSSED DENTON, WHICH MAKES IT EXTREMELY TEDIOUS ON TOP OF ALL OF THE OTHER DUTIES THAT THEY'RE TRYING TO DO. SO NOW, WE ARE TRYING TO CONSOLIDATE THAT INTO ONE PERSON. THAT THIS IS THEIR KIND OF NEW JOB IS TO SERVE AS THE LIAISON BETWEEN THE DEPARTMENT AND THE COMMUNITY. SO ONE OF THE FIRST THINGS THAT THEY'RE GOING TO BE TASKED WITH IS LEARNING. DISCUSS DENTON. AND NOT ONLY LEARNING IT, BUT PROVIDING THOSE UPDATES IN A MORE CONSISTENT BRANDED THING FROM CAPITAL PROJECTS. SO THIS POSITION IS CURRENTLY OUT THERE ADVERTISING ON THE WEBSITE. WE'RE ABOUT TO START PHONE INTERVIEWS. I'M CRAZY EXCITED ABOUT THIS. WE WE WERE ABLE TO GET THE SUPPORT OF OUR CITY MANAGER'S OFFICE TO GET THIS IMPLEMENTED. SO AGAIN, I THINK MOVING INTO THE NEW YEAR, THIS IS GOING TO BE A HUGE GAME CHANGER FOR OUR GROUP AND HAVING ONE PERSON KIND OF ASSIGNED TO UPDATING THE WEBSITE. AGAIN, I THINK THIS IS GOING TO LEAD INTO MORE OPPORTUNITIES FOR VIDEOS AND SOCIAL MEDIA POSTS. AGAIN, REALLY TO GET THE STORY OF ALL THE GOOD WORK THAT WE'RE DOING OUT THERE AND TO MAKE SURE IT'S STAYING UPDATED ON THE WEBSITE. SO AGAIN, JUST THERE AT THE BOTTOM ARE INITIATIVES FOR THE DEPARTMENT IS TO INCREASE AND IMPROVE THAT PROJECT SPECIFIC UPDATES ACROSS ALL OF OUR SOCIAL MEDIA PLATFORMS AND DISCUSS DENTON. AND THEN ULTIMATELY LOOK AT EXPANDING TEXT DENTON TO PROVIDE MORE TIMELY CONSTRUCTION UPDATES. SO WE'RE GOING TO BE ROLLING THAT OUT TO ALL THE PROJECTS THAT WE FIND IT VALUABLE FOR, ESPECIALLY ANYTHING IN A NEIGHBORHOOD THAT'S HAPPENING OR SOME OF THE LARGER ARTERIALS. SO AGAIN, JUST CONTINUING TO BUILD OFF THE MOMENTUM THAT WE HAD TOWARDS THE END OF NEIGHBORHOOD TWO AND SIX. >> OKAY. >> WHEN, WHEN. >> WHEN DO YOU EXPECT TO HIRE SOMEONE FOR THAT POSITION? >> SO HOPEFULLY IN DECEMBER, WE'RE, WE'RE GOING TO BE STARTING THE ACTUAL INTERVIEW PROCESS RIGHT AFTER THANKSGIVING. AND MY HOPE IS FIRST OF THE YEAR THAT THAT PERSON IS IN THAT POSITION, IT'S GOING TO BE HOUSED UNDER MISS MEGAN ON OUR ADMIN TEAM. AND SO JANUARY WILL, WILL, WILL KICK THAT OFF. COOL. >> YEAH. AND I THINK TO WHAT COUNCIL MEMBER RUMOHR SAID THAT WILL HELP AS WELL WITH SOME OF THE THINGS YOU WERE JUST DESCRIBING, LIKE SOME PAGES ARE MISSING THINGS. SO I THINK THAT'S GOING TO BE FABULOUS FOR JUST TO HAVE A COHESIVE FEEL TO IT. SO I'M VERY EXCITED FOR YOU ALL. >> COMPLETELY AGREE. AND JUST TO TAG ON TO THAT. SO WE ARE WORKING VERY CLOSELY WITH KAYLA AND MARKETING COMMUNICATIONS ARE ACTUALLY ON THE INTERVIEW PANEL TO, TO HELP US WITH THIS HIRING. SO THERE'S GOING TO BE A LOT OF OPPORTUNITIES THERE FOR US TO, AGAIN, NOT JUST GET BETTER, BUT ALSO GROW OUR COMMUNICATIONS THAT I'M EXCITED ABOUT. >> YEAH. AND I JUST WANT TO ADD TO THAT, THAT I'M VERY EXCITED AND I APPRECIATE WHOEVER'S IDEA THIS WAS TO HAVE THIS POSITION BECAUSE IT IS A LITTLE CHALLENGING TO HAVE SOMEBODY THAT'S REALLY GOOD AT PROJECT MANAGEMENT. THEY MAY NOT BE GOOD AT WRITTEN COMMUNICATION, FOR EXAMPLE. THAT'S JUST NOT ONE OF THEIR BEST SKILLS. SO IT'LL BE NICE TO HAVE SOMEBODY WITH A TARGETED SKILL FOR THAT. AND I HOPE THAT THEY ARE A LITTLE ANNOYING, BUT VERY PLEASANT IN TERMS. I THINK THEY'RE GOING TO BE POKING ALL THE PROJECT MANAGERS FOR UPDATES. SO ABSOLUTELY, I HOPE, I HOPE THE PROJECT MANAGERS LIKE THEM. THANKS. >> ANYONE ELSE. >> THAT IS THE END. >> VERY GOOD. >> AWESOME. >> GOOD REPORT. >> THANK YOU, THANK YOU, THANK YOU. >> NEXT ITEM D MC 26-026. RECEIVE A REPORT, HOLD A DISCUSSION AND APPROVE THE 2027 MOBILITY COMMITTEE MEETING SCHEDULE. >> AND SO, CHAIR HAALAND, WE'RE [00:45:06] REALLY JUST LOOKING FOR THE COMMITTEE'S FEEDBACK ON THE PROPOSED SCHEDULE HERE. WE'RE LOOKING AT THE LAST WEDNESDAY OF THE MONTH LIKE WE TYPICALLY HAVE FOR THIS COMMITTEE. AND IF THERE'S ANY FEEDBACK THIS WE'RE ASKING FOR APPROVAL ALSO. SO TO TAKE A VOTE ON APPROVING THE SCHEDULE. >> THAT DOESN'T THAT DOESN'T CHANGE THE LAST WEDNESDAY UNTIL NOVEMBER AND DECEMBER. >> YEAH, YEAH. WE MADE SOME ADJUSTMENTS FOR HOLIDAYS. >> MEMBERS. >> YEAH. >> I MOTION TO APPROVE THE MEETING SCHEDULE. >> I'LL SECOND. >> OKAY. A MOTION AND A SECOND. ANY DISCUSSION. THOSE IN FAVOR I I VERY GOOD. AND OUR NEXT MEMBER NEXT MEETING IS DECEMBER 16TH. THANK YOU VERY MUCH. >> ALL RIGHT. AND WE HAVE ONE LAST ITEM ON THE AGENDA. [E. MC26-027 Staff Memorandum Denton Shopping Center Sidewalks Shade Additives to Sidewalks Future Items Matrix] >> OH ON THE OTHER SIDE. >> EMC26-027. STAFF MEMORANDUM DENTON SHOPPING CENTER SIDEWALK SHADED SHADE ADDITIVES TO SIDEWALKS. FUTURE MATRIX. >> SO YEAH, HERE ON THE THE MEMORANDUM, WE'RE SHOWING UPDATES ON TWO OF THE LAST ITEMS THAT WE HAD REGARDING THE DOWNTOWN SHOPPING CENTER SIDEWALKS, AND ALSO THE SHADE ADDITIVES TO SIDEWALKS. >> GOOD MORNING. >> GOOD MORNING, CHAIR AND COMMITTEE MEMBERS. BUT DIRECTOR OF TRANSPORTATION, I AM HAPPY TO ADDRESS ANY QUESTIONS ON THIS. >> I HAVE A QUESTION HERE, PLEASE. >> ON THE FIRST THE FIRST SECTION I UNDERSTAND THIS IS THIS THIS WOULD BE A HUGE SCOPE PROJECT. WHAT WHAT DOES IT MEAN BY IT'S NOT A HIGH PRIORITY SAFETY NEED FOR THIS AREA. >> SINCE THERE IS FROM CIP STANDPOINT, THE SAFETY NEEDS IS PRIORITIZED BASED ON CRASH FATALITIES. AND THEN IF THERE ARE ALTERNATIVES AVAILABLE, FOR EXAMPLE, IN THIS CASE, THE SOUTH SIDE HAS SIDEWALK. AND SO FROM THAT STANDPOINT, AND GIVEN THE DRAINAGE COMPONENT IN THE PROJECT, VERY LIKELY TXDOT WILL NOT PRIORITIZE IT BECAUSE OF THESE THREE COMPONENTS. AND WE HAD A DISCUSSION WITH THEM. AND IT LOOKS LIKE IT'S NOT A PRIORITY. >> OKAY. AND THAT'S BASED ON THE FATALITIES, BUT NOT ON OTHER CRASHES. >> FATALITY. IT'S A MIX FATALITIES PLUS HOW MUCH BUDGET IT WOULD COST BECAUSE WE WHEN WE SUBMIT THIS CIP APPLICATION, IT IS COMPETING WITH APPLICATIONS FROM STATEWIDE. AND SO IT WITH THIS MUCH BUDGET AND DRAINAGE COMPONENT, TXDOT MAINTAINING THE RIGHT OF WAY. ALL OF THESE FACTORS, PLUS CIP ZONE CRITERIA BASED ON FATALITIES AND SERIOUS INCAPACITATING INJURIES, IT BECOMES A CHALLENGE WHEN IT COMES TO OTHER APPLICATIONS COMPETING WITH OTHER APPLICATIONS. >> ARE THERE OTHER JUST IF IF IF IT WAS DETERMINED, IF WE IF THE CITY DETERMINED THAT THERE WAS RISK OR A NEED FOR THAT, ARE THERE OTHER FUNDING SOURCES BESIDES CIP, COULD THERE BE SOMETHING WITH NTC COG, OR COULD THE CITY DECIDE IN A FUTURE BUDGET TO SAY, THIS IS SOMETHING THAT WE WANT? WE SEE THAT THERE'S PEOPLE WALKING WITHOUT SIDEWALKS, EVEN IF THERE IS AN OPTION ON THE SOUTH SIDE OF THE ROAD. >> WE HAVE A PRIORITIZED LIST FOR SIDEWALK AND BIKE LANES THAT WE ARE. STAFF IS PLANNING TO PRESENT IN DECEMBER'S MOBILITY COMMITTEE. SO WHEN IT COMES TO CITY'S PROJECTS, WE ARE STICKING TO AND CIP BUDGETS ALLOCATED FOR THOSE PROJECTS. WE ARE STICKING TO THE PRIORITIZED LIST. AND THAT CRITERIA IS PRETTY STANDARD, AND WE ARE JUST PARSING ALL THE PROJECTS THROUGH THAT CRITERIA AND WHATEVER COMES ON THE TOP PRIORITY. WE ARE WORKING ON THAT. OKAY, THANKS. >> ANYTHING ELSE? >> I, I JUST HAVE ONE MORE QUESTION. GO AHEAD. >> OKAY, SO ABOUT THE TREES OR ABOUT THE SHADE. I HAD A COUPLE QUESTIONS ON THAT. >> YES, WE HAVE OUR PLANNING TEAM HERE. >> SO AWESOME. I WAS WONDERING, AM I IT MIGHT START GOING INTO THIS. SO WE'VE GOT A STANDARD. I'M WONDERING, DO WE HAVE HAVE WE DOCUMENTED THE GAPS OF WHERE WE DON'T HAVE SHADE IN DENTON? >> SURE. GOOD MORNING, COMMITTEE MEMBERS. I DON'T THINK I'VE MET SOME OF YOU. MY NAME IS ANGIE MINGUS, ASSISTANT PLANNING DIRECTOR. SO WHEN WE LOOK AT STREET TREES FROM THE [00:50:03] PLANNING SIDE, WE'RE PREDOMINANTLY LOOKING AT NEW DEVELOPMENTS COMING IN. WE DO HAVE THE REQUIREMENT, AS OUTLINED IN YOUR MEMO HERE. SO ANY ANY NEW DEVELOPMENT YOU SEE IN THE CITY OF DENTON IS REQUIRED TO PROVIDE ONE SHADE TREE PER EVERY 30 LINEAR FEET OF STREET FRONTAGE. SO THAT'S FOR ALL NEW DEVELOPMENTS. AND THEN CODE HAS CHANGED OVER TIME. SO THE REQUIREMENTS HAVE CHANGED OVER TIME. AS FAR AS LOOKING AT AND ASSESSING, YOU KNOW, GAPS IN CITY INFRASTRUCTURE WHEN OPPORTUNITIES ARISE, WHEN NEW PROJECTS COME IN, WHETHER THAT BE, YOU KNOW, NEW SIDEWALK PROVISIONS, PLANNING STAFF DOES LOOK AT THOSE AS WHERE ARE THERE OPPORTUNITIES TO MAYBE PROVIDE SHADE TREES? IN ADDITION, YOU KNOW, WE DO HAVE THE NEW, THE DOWNTOWN DESIGN DOWNTOWN DENTON PLAN. AND THAT ALSO CALLED FOR LOOKING AT SOME OF OUR CORE STREETS WITHIN THE DOWNTOWN AREA THAT ARE KNOWN PEDESTRIAN PATHWAYS AND LINKAGES TO, TO PROVIDE WHAT WE CALL COOL STREETS, WHICH IS LOOKING AT OPPORTUNITIES WHERE WHERE CAN WE PROVIDE ADDITIONAL SHADE VIA ADDITIONAL PLANTINGS OR OTHER MECHANISMS? SO IT IS SOMETHING THAT THAT WE LOOK AT, BUT LARGELY WHERE WE'RE LOOKING AT ADDING NEW NEW TREES FOR, FOR STREET SHADE IS THOSE OPPORTUNITIES COME WITH NEW DEVELOPMENT BECAUSE THAT'S A REQUIREMENT WE HAVE IN THE CODE, AND THOSE DEVELOPERS ARE RESPONSIBLE FOR PLANTING AND MAINTAINING THOSE UNTIL THEY'RE ESTABLISHED. >> AND I YEAH, I MEAN, I THINK THAT THAT'S A GREAT THAT'S A GREAT START WHERE I'M CONCERNED. AND I DON'T KNOW HOW CODE WOULD WORK FOR THIS, BUT WE HAVE SO MANY OLDER NEIGHBORHOODS THAT ARE ESTABLISHED. THE PLOTS ARE THERE. NO NEW DEVELOPMENT IS EVER GOING TO HAPPEN. AND WE'VE GOT FOLKS, YOU KNOW, WALKING WHERE IT'S REALLY, REALLY HOT. I THINK ABOUT THE KIDS IN MY NEIGHBORHOOD THAT WALK IT'S AND IT'S A PRIVATELY OWNED PROPERTY OWNED BY A CHURCH, YOU KNOW, AND SO THAT CHURCH, THERE'S NO NEW DEVELOPMENT EVER GOING TO HAPPEN. BUT KIDS ARE WALKING ON, ON THE STREET WHERE IT'S SUPER HOT. SO HOW ARE THERE OTHER MAYBE THIS IS A BIGGER QUESTION, BUT I'M CURIOUS IF WE'VE DETERMINED LIKE TREES HELP. COOL STREETS ARE A THING WE WANT TO DO. COOL STREETS IN DOWNTOWN CORRIDOR. HOW CAN WE EXPAND THAT SCOPE AND SAY, HEY, WE'VE DETERMINED WE WANT TO MAKE AREAS WHERE KIDS ARE WALKING TO SCHOOL A COOL STREET, OR WE WANT TO MAKE EVEN PLACES THAT ARE NOT NECESSARILY PEDESTRIAN HEAVY, BUT ARE MAJOR ARTERIALS, EVEN LIKE 380, LIKE WE, WHERE COULD WE PUT, COULD WE PUT SOME TREES THERE? I KNOW WE HAVE TREE GIVEAWAY PROGRAMS, BUT AGAIN, WE HOW, HOW CAN WE GET MORE TREES IN THE PLACES THAT ARE NOT NEW DEVELOPMENT? >> YEAH, I THINK I CAN HELP ANSWER THAT ONE. I DON'T KNOW IF THAT'S REALLY A MOBILITY COMMITTEE SPECIFIC QUESTION OR MORE GEARED TOWARDS ANOTHER COMMITTEE THAT'S MORE, YOU KNOW, ENVIRONMENTALLY FOCUSED OR, OR SUSTAINABILITY IN OUR IN OUR TREE FOLKS, BUT WE CAN DEFINITELY GET WITH THEM TO SEE IF THERE'S ANY INITIATIVES ON THEIR SIDE TO SEE IF THAT'S SOMETHING THAT COULD BE DONE. >> YEAH, I MEAN, I WOULD SAY IT'S STILL A MOBILITY ISSUE. IT'S PEOPLE MOVING AND, AND THEY'RE NOT GOING TO GO ANYWHERE IF IT'S I MEAN, I'VE DOCUMENTED THAT THAT THE SIDEWALK IS 140 DEGREES. SO THAT'S A SAFETY ISSUE. AND WE'VE GOT, WE'VE, YOU COULD HAVE A HEAT RELATED ILLNESS IF YOU ARE TRYING TO WALK SOMEWHERE AND YOU DON'T HAVE A CAR, THAT'S, THAT'S A MOBILITY ISSUE. AND AS IT COMES TO ACTUAL HUMAN SAFETY. SO I THINK IT'S A LITTLE BIT OF BOTH. I DON'T I JUST THINK AS WE IT'S GREAT THAT WE'RE LIKE, WE'RE PUTTING IN NEW INFRASTRUCTURE FOR OUR SIDEWALKS, WE'RE PUTTING IN NEW INFRASTRUCTURE FOR OUR BIKE LANES. BUT IF IT'S STILL 140 DEGREES AND IT'S UNSAFE TO EVEN USE THAT SIDEWALK, WE'RE REALLY MISSING OUT. WE'RE NOT GOING TO BE SEEING PEOPLE USE THOSE FACILITIES. AND AS SOMEONE THAT IS AN ADVOCATE FOR FOR THOSE FACILITIES, IT CAN BE FRUSTRATING. THEN WHEN I HAVE NEIGHBORS SAY, WELL, I DON'T SEE ANYBODY EVEN USING THE SIDEWALK, WHY ARE WE SPENDING MILLIONS OF DOLLARS TO PUT IN A SIDEWALK? AGAIN, HUMANS AREN'T GOING TO USE IT IF THEY DON'T FEEL SAFE, OR IF THEY DON'T FEEL LIKE THEY CAN EVEN ENJOYABLY USE THAT FACILITY. SO I'M JUST GOING TO SAY THAT AS WELL. I THINK I THINK IT'S A LITTLE BIT OF BOTH FOR SURE, BUT I APPRECIATE YOU ANSWERING THE QUESTION. THANK YOU. >> OKAY. >> ANYTHING ELSE? WHAT ABOUT THE MATRIX? >> WE DON'T HAVE TO TAKE ANY ACTION ON THE MATRIX. WE'VE SHOWN THE ITEMS HERE THAT WE'RE PLANNING ON REMOVING, AND THEN WE'VE GOT A FEW ADDITIONAL ITEMS THAT WE'LL BE BRINGING BACK TO YOU IN FUTURE MEETINGS. >> ANY COMMENTS ABOUT THE MATRIX MEMBERS? OKAY. OKAY. ANYTHING ELSE? CONCLUDING ITEMS? [3. CONCLUDING ITEMS] [00:55:03] YES. >> I DID WANT TO MENTION ONE THING BECAUSE I FORGOT EARLIER. SO FOR THE LAST ABOUT 18 MONTHS, I'VE BEEN A ONE MAN SHOW IN THE CAPITAL PROJECTS DEPARTMENT. RECENTLY, I WAS ABLE TO HIRE A DEPUTY DIRECTOR AND GET SOME HELP. SO HE'S HERE WITH ME TODAY. MR. SCOTT FETTIG, HE WAS ONE OF OUR SENIOR PROJECT MANAGERS. SO YOU'RE GOING TO SEE HIM STARTING TO DO SOME OF THE CONSTRUCTION REPORTS FOR MOBILITY COMMITTEE IN THE COMING MONTHS. SO HE'S BEEN WITH ME FOR ABOUT FIVE YEARS, I THINK, IN THE CIP DEPARTMENT. SO I DID WANT TO ACKNOWLEDGE THAT THAT HE'S HERE AND YOU'LL START SEEING A NEW FACE AS WELL IN THESE MEETINGS. >> VERY GOOD. WELCOME, WELCOME. >> THANK. >> THAT'S IT. YEAH. >> AND I HEAR THAT SCOTT HAS ALREADY GIVEN SOME STRONG WORDS TO SOMEBODY OF SOMETHING THAT HAPPENED THIS WEEK. SO THANK YOU, SCOTT, FOR THAT. I GUESS I'LL BE VAGUE THERE SOMEWHERE IN MY DISTRICT. I'LL HELP YOU A LITTLE BIT. I JUST DID WANT TO SAY THAT LAST WEEK I ATTENDED THE TEXAS TRAILS AND ACTIVE TRANSPORTATION CONFERENCE. I KNOW WE HAD ONE CITY STAFF MEMBER THERE, SO I DID ATTEND SOME MEETINGS ABOUT QUICK BUILD PROJECTS TO SLOW DOWN SPEEDS AND IMPROVE PEDESTRIAN SAFETY. I ATTENDED ONE ABOUT TRYING TO BRING DOWN THE COST OF DOING THESE THINGS THROUGH DIFFERENT PROCUREMENT METHODS, SO I'D BE HAPPY TO GET STAFF IN CONTACT WITH SOME OF THE THE STAFF WHO WERE PRESENTING SOME OF THESE PRESENTATIONS, A COUPLE OF THEM NEW. FARHAN, ACTUALLY, I THINK YOU'RE GREAT. SO JUST WANTED TO, TO SHARE THAT, THAT YOU'LL PROBABLY HEAR FROM ME OR I'LL TRY TO GET Y'ALL IN CONTACT TO SHARE IDEAS. THANK YOU. >> OKAY, OKAY. ANYTHING ELSE? IT'S JUST A MINUTE OR SO BEFORE 11:00. SO * This transcript was compiled from uncorrected Closed Captioning.
Agenda
2 pages
City of Denton City Hall 215 E. McKinney St. Denton, Texas 76201 www.cityofdenton.com Meeting Agenda Mobility Committee Wednesday, November 18, 2026 10:00 AM Council Work Session Room After determining that a quorum is present, the Mobility Committee of the City of Denton, Texas will convene in a Regular Meeting on Wednesday, November 18, 2026 at 10:00 a.m. in the Council Work Session Room at City Hall, 215 E. McKinney Street, Denton, Texas at which the following items will be considered: 1. CITIZEN COMMENTS ON AGENDA ITEMS This section of the agenda allows citizens to speak on any individual consideration item on the agenda. Individuals are only able to comment one time per agenda item Each speaker will be given a total of three (3) minutes per agenda item. A Request to Speak Card must be completed and returned to the Staff Liaison before the Committee considers the item. 2. ITEMS FOR INDIVIDUAL CONSIDERATION A. MC26-021 Consider approval of the minutes of September 30, 2026. Attachments: Exhibit 1 - Minutes B. MC26-023 Receive a report and hold a discussion regarding the City of Denton Transportation/Mobility Project Status Report. [Estimated Presentation Time: 30 minutes] Attachments: Exhibit 1 - Agenda Information Sheet Exhibit 2 - City of Denton Transportation/Mobility Project Status Report C. MC26-025 Receive a report and hold a discussion regarding Capital Projects Communication Outreach. [Estimated Presentation Time: 30 minutes] Attachments: Exhibit 1 - Agenda Information Sheet Exhibit 2 - Presentation D. MC26-026 Receive a report, hold a discussion, and approve the 2027 Mobility Committee meeting schedule. [Estimated Presentation Time: 5 minutes] Attachments: Exhibit 1 - Agenda Information Sheet Exhibit 2 - Proposed 2027 Meeting Schedule Exhibit 3 - Ordinance 19-2865 Page 1 Printed on 11/13/2026 Mobility Committee Meeting Agenda November 18, 2026 E. MC26-027 Staff Memorandum Denton Shopping Center Sidewalks Shade Additives to Sidewalks Future Items Matrix …

... (truncated, showing first 2000 characters)

Back to Search