 - Okay, it is nine o'clock and we do have a quorum.

00:00:05.000 --> 00:00:12.240
 So we'll call to order the February 10th,

00:00:12.240 --> 00:00:16.040
 2020 City of Debt and Public Utilities Board.

00:00:16.040 --> 00:00:18.700
 The first item is receive a report,

00:00:18.700 --> 00:00:20.820
 hold a discussion, and give staff direction

00:00:20.820 --> 00:00:24.560
 regarding credit and collections, performance, and processes.

00:00:24.560 --> 00:00:28.640
 - Madam Chair, board members,

00:00:28.640 --> 00:00:31.040
 Christa Foster, Utility Customer Service,

00:00:31.040 --> 00:00:33.320
 and I'm here this morning just to give some updates

00:00:33.320 --> 00:00:35.960
 on some of our different credit and collections processes.

00:00:35.960 --> 00:00:38.840
 Most importantly, to give an update on the release

00:00:38.840 --> 00:00:43.340
 in year today on outstanding bad debt.

00:00:43.340 --> 00:00:47.680
 As everyone may remember, the new board members

00:00:47.680 --> 00:00:50.080
 are certainly going to get the quick refresher

00:00:50.080 --> 00:00:52.460
 that in February of 2018, we made some changes

00:00:52.460 --> 00:00:54.640
 to our credit and collections practices.

00:00:54.640 --> 00:00:56.360
 We added some additional funds

00:00:56.360 --> 00:00:59.000
 to our plus one utility assistant program.

00:00:59.000 --> 00:01:01.640
 We introduced a couple of new deposit waiver options

00:01:01.640 --> 00:01:02.560
 for customers.

00:01:02.560 --> 00:01:07.680
 Our internal credit score and rating system was modified,

00:01:07.680 --> 00:01:10.160
 which was the largest of these changes.

00:01:10.160 --> 00:01:14.160
 First, interest no longer counted as a credit event.

00:01:14.160 --> 00:01:18.280
 Credit scoring allowed for additional occurrences

00:01:18.280 --> 00:01:20.720
 before it impacted a customer negatively.

00:01:20.720 --> 00:01:23.080
 And we changed our process from requiring

00:01:23.080 --> 00:01:26.040
 a two month deposit on all at-risk accounts

00:01:26.040 --> 00:01:28.000
 to one of our credit tiers

00:01:28.000 --> 00:01:30.600
 requires a one month security deposit.

00:01:30.600 --> 00:01:34.320
 When Navigate Consulting was here in March of 2019,

00:01:34.320 --> 00:01:37.240
 they were reviewing our credit and collections processes

00:01:37.240 --> 00:01:39.160
 and did express some concerns

00:01:39.160 --> 00:01:41.200
 about the growing rate of the bad debt

00:01:41.200 --> 00:01:44.520
 that we had seen since those changes had been put into place.

00:01:44.520 --> 00:01:47.200
 And we made several updates through last spring and summer,

00:01:47.200 --> 00:01:49.800
 with the last being August of 2019,

00:01:49.800 --> 00:01:52.200
 when we provided the bad debt performance update

00:01:52.200 --> 00:01:55.440
 to the public utilities board and the council.

00:01:55.440 --> 00:01:59.160
 Since that time, when we came in August,

00:01:59.160 --> 00:02:01.120
 it was trending in such a way

00:02:01.120 --> 00:02:06.120
 that the FY18-19 bad debt growth was 44% higher

00:02:06.120 --> 00:02:10.680
 than the previous year, which is very alarming.

00:02:10.680 --> 00:02:12.600
 We were tasked to please come back

00:02:12.600 --> 00:02:14.240
 with possible containment strategies

00:02:14.240 --> 00:02:16.040
 if it was continuing to trend that way,

00:02:16.040 --> 00:02:18.440
 but to be sure to monitor that growth.

00:02:18.440 --> 00:02:22.800
 At this time, with the full third quarter included,

00:02:22.800 --> 00:02:25.000
 the growth has slowed somewhat

00:02:25.000 --> 00:02:27.840
 and we are at a total 26% increase

00:02:27.840 --> 00:02:30.120
 over the previous year's bad debt,

00:02:30.120 --> 00:02:35.040
 and that is just over $330,000 for that time period.

00:02:35.040 --> 00:02:39.120
 It's stabilizing somewhat,

00:02:39.120 --> 00:02:41.560
 but it is not fully stable on our debt growth.

00:02:41.560 --> 00:02:44.320
 This is still an area of concern.

00:02:44.320 --> 00:02:46.840
 We are not bringing containment strategies today,

00:02:46.840 --> 00:02:50.280
 but we are still very closely monitoring the situation

00:02:50.280 --> 00:02:53.320
 and requesting that no additional changes be made

00:02:53.320 --> 00:02:55.080
 to our current processes.

00:02:55.080 --> 00:02:58.880
 So the other thing that's important to note

00:02:58.880 --> 00:03:02.080
 is that the very early data that we're beginning to see,

00:03:02.080 --> 00:03:05.680
 we're starting to see that the decrease in bad debt growth

00:03:05.680 --> 00:03:10.680
 as well as late fee assessments is going down,

00:03:10.680 --> 00:03:13.840
 but that trend seems to follow the patterns

00:03:13.840 --> 00:03:15.360
 that we're seeing with the growth

00:03:15.360 --> 00:03:17.320
 in the Pay As You Go program.

00:03:17.320 --> 00:03:20.480
 So we would like to continue focusing our efforts

00:03:20.480 --> 00:03:22.040
 on the Pay As You Go currently

00:03:22.040 --> 00:03:24.000
 as our cost containment strategy.

00:03:24.000 --> 00:03:28.200
 The second reason that I'm here this morning

00:03:28.200 --> 00:03:31.080
 is our Red Flags Rule.

00:03:31.080 --> 00:03:34.800
 We will be bringing to council a Red Flags Rule ordinance

00:03:34.800 --> 00:03:36.840
 to formalize our policy.

00:03:36.840 --> 00:03:40.600
 As a quick summary, Red Flags Rule was enacted in 2008

00:03:40.600 --> 00:03:45.600
 and all creditors were required to be in compliance by 2009.

00:03:45.600 --> 00:03:48.960
 And all this is, the Red Flags Rule is here

00:03:48.960 --> 00:03:52.080
 to formalize the requirement and the obligation

00:03:52.080 --> 00:03:54.760
 that creditors have toward their customers

00:03:54.760 --> 00:03:57.800
 to protect them from identity theft.

00:03:57.800 --> 00:04:01.040
 So we have been following Red Flags practices,

00:04:01.040 --> 00:04:03.800
 but during a review of our program

00:04:03.800 --> 00:04:07.520
 and some of the things internally in our internal directives,

00:04:07.520 --> 00:04:09.880
 we realized that there was never a formalized

00:04:09.880 --> 00:04:12.400
 ordinance or policy brought to council.

00:04:12.400 --> 00:04:14.040
 And so that's what we are doing now.

00:04:14.040 --> 00:04:15.960
 We wanted to go ahead and just do that

00:04:15.960 --> 00:04:17.960
 and get everything put together at once.

00:04:19.440 --> 00:04:23.880
 When the Red Flags Rule first came out in 2008,

00:04:23.880 --> 00:04:26.800
 Texas Municipal League put together a draft policy

00:04:26.800 --> 00:04:29.200
 and program where they help with identifying the Red Flags

00:04:29.200 --> 00:04:33.840
 as they apply to utilities in the municipal areas.

00:04:33.840 --> 00:04:37.240
 We are using that model to create our program

00:04:37.240 --> 00:04:39.200
 and we'll be bringing that back to you.

00:04:39.200 --> 00:04:44.040
 So the next steps that we have is for you guys

00:04:44.040 --> 00:04:46.640
 to review that as it comes back out of legal.

00:04:46.640 --> 00:04:48.520
 We are going to recommend that it be adopted

00:04:48.520 --> 00:04:52.120
 as it stands, that we will continue to monitor

00:04:52.120 --> 00:04:54.240
 our uncollectible debt trend

00:04:54.240 --> 00:04:56.800
 and we will be providing information back

00:04:56.800 --> 00:05:00.880
 at the end of April, whether that be in a staff report,

00:05:00.880 --> 00:05:03.960
 if there's nothing significant to report,

00:05:03.960 --> 00:05:05.560
 but we may again be coming back

00:05:05.560 --> 00:05:07.760
 with cost containment strategies

00:05:07.760 --> 00:05:10.280
 if that changes significantly.

00:05:10.280 --> 00:05:12.920
 That we're gonna continue with our current processes

00:05:12.920 --> 00:05:16.440
 and focus on the growth of our PHUO prepaid utilities.

00:05:19.280 --> 00:05:21.120
 - And with that, are there any questions?

00:05:21.120 --> 00:05:25.680
 - Yes, can we get a copy of the Red Flags provisions?

00:05:25.680 --> 00:05:26.840
 - You will be getting a copy.

00:05:26.840 --> 00:05:29.080
 I had hoped to attach them before this

00:05:29.080 --> 00:05:31.360
 so we could have that kind of discussion.

00:05:31.360 --> 00:05:34.760
 It was still illegal, so we hadn't quite gotten there,

00:05:34.760 --> 00:05:37.400
 but it will be coming in a couple of weeks.

00:05:37.400 --> 00:05:41.160
 But yes, we will make sure that you have a copy of that.

00:05:41.160 --> 00:05:43.600
 - And back on the page with the graphs,

00:05:43.600 --> 00:05:48.120
 I noticed one of the covers, three quarters,

00:05:48.120 --> 00:05:49.720
 and one of them covers years.

00:05:49.720 --> 00:05:51.640
 The dollar amount that's on that,

00:05:51.640 --> 00:05:53.680
 is that the actual write-off

00:05:53.680 --> 00:05:55.520
 or the balance of uncollectible debt?

00:05:55.520 --> 00:05:57.400
 - That is the actual write-off.

00:05:57.400 --> 00:06:00.040
 So as you see, the $448,000,

00:06:00.040 --> 00:06:03.000
 that was the entire amount of written off bad debt

00:06:03.000 --> 00:06:06.440
 for the entire FY17-18 fiscal year,

00:06:06.440 --> 00:06:09.400
 where the 18-19 fiscal year to date

00:06:09.400 --> 00:06:13.400
 is $330,000 for the first three quarters.

00:06:13.400 --> 00:06:16.000
 - But the 18, we're talking about a three quarter period

00:06:16.000 --> 00:06:17.320
 versus a four quarter period?

00:06:17.320 --> 00:06:18.160
 - Correct.

00:06:18.160 --> 00:06:19.000
 - So.

00:06:19.000 --> 00:06:19.840
 - You will see.

00:06:19.840 --> 00:06:20.680
 You will see it in the graph.

00:06:20.680 --> 00:06:22.160
 - So $440,000 is the number,

00:06:22.160 --> 00:06:26.920
 $330,000 times four over three would be $440,000.

00:06:26.920 --> 00:06:30.040
 - Well, the third quarter is actually the lowest,

00:06:30.040 --> 00:06:31.600
 as you can see in each of those graphs.

00:06:31.600 --> 00:06:33.360
 That is the lowest amount of bad debt

00:06:33.360 --> 00:06:35.680
 that we generally produce each year.

00:06:35.680 --> 00:06:37.120
 - So it'll be more than $440,000.

00:06:37.120 --> 00:06:39.480
 - Typically, well last year,

00:06:39.480 --> 00:06:43.600
 the amount of debt in the fourth quarter was $180,000.

00:06:43.600 --> 00:06:47.440
 And as of yet, we have not seen a quarter

00:06:47.440 --> 00:06:51.440
 that has not had some level of growth overall.

00:06:51.440 --> 00:06:54.960
 So it is likely that it will come in above that.

00:06:54.960 --> 00:06:57.160
 - And the three quarters that you're showing

00:06:57.160 --> 00:07:02.160
 on the 2018-19, is that through June 30th?

00:07:02.160 --> 00:07:04.400
 - It would be through the June 30th, yes.

00:07:04.400 --> 00:07:05.640
 - Okay, and what's the number

00:07:05.640 --> 00:07:07.960
 from June 30th through September 30th?

00:07:07.960 --> 00:07:09.440
 - We don't have a number yet.

00:07:09.440 --> 00:07:12.440
 The way bad debt works is it's written off

00:07:12.440 --> 00:07:15.360
 six months after the account closes.

00:07:15.360 --> 00:07:20.040
 So what happens is we won't see those numbers

00:07:20.040 --> 00:07:20.920
 for a delayed period,

00:07:20.920 --> 00:07:24.320
 which is why we're not into the current fiscal year.

00:07:24.320 --> 00:07:27.480
 It has to have been bad debt abandoned for some time.

00:07:27.480 --> 00:07:28.720
 It will be the first of April,

00:07:28.720 --> 00:07:31.800
 but for last year, we'll be completely closed out.

00:07:31.800 --> 00:07:34.220
 - So how does this impact the city budget?

00:07:34.220 --> 00:07:39.200
 Does the city budget have a number in there?

00:07:40.360 --> 00:07:42.600
 - Where's finance? - Okay.

00:07:42.600 --> 00:07:49.600
 - David Haynes, director of finance.

00:07:49.600 --> 00:07:51.040
 As we budget each year,

00:07:51.040 --> 00:07:54.960
 we take into account in our revenue projections, bad debt.

00:07:54.960 --> 00:07:57.600
 So ultimately, when you look at any utility funds,

00:07:57.600 --> 00:08:00.360
 it's represented in the revenue forecast that we have,

00:08:00.360 --> 00:08:02.640
 and ultimately, the cost of services associated with that

00:08:02.640 --> 00:08:03.860
 on the expense side.

00:08:03.860 --> 00:08:06.620
 - So how much do you budget for

00:08:06.620 --> 00:08:09.620
 in a year's time for bad debt release utility?

00:08:11.200 --> 00:08:14.280
 - We can look at that, and I don't know off the top of my head.

00:08:14.280 --> 00:08:16.680
 I think a figure for you is just part

00:08:16.680 --> 00:08:17.640
 of our revenue projections,

00:08:17.640 --> 00:08:20.120
 but we can come back and estimate that.

00:08:20.120 --> 00:08:22.280
 And it's gonna be in line with what's here

00:08:22.280 --> 00:08:24.180
 distributed amongst the utilities,

00:08:24.180 --> 00:08:28.560
 but we don't necessarily have a line item for bad debt.

00:08:28.560 --> 00:08:32.320
 - And this is just water and wastewater, is that true?

00:08:32.320 --> 00:08:33.880
 - It includes electric as well.

00:08:33.880 --> 00:08:34.720
 - Includes.

00:08:34.720 --> 00:08:40.080
 - What was the impact?

00:08:40.080 --> 00:08:42.560
 Most utilities do the two months deposit,

00:08:42.560 --> 00:08:47.560
 because by the time we know that it's going bad,

00:08:47.560 --> 00:08:49.880
 more than a month has passed.

00:08:49.880 --> 00:08:54.160
 So is that the main reason why we're seeing the increase,

00:08:54.160 --> 00:08:57.320
 and is it both residential and commercial?

00:08:57.320 --> 00:08:59.460
 - It is primarily residential,

00:08:59.460 --> 00:09:02.240
 and it is because we have

00:09:02.240 --> 00:09:05.840
 far fewer residential deposits on file.

00:09:05.840 --> 00:09:09.640
 We saw about an $800,000 decrease

00:09:09.640 --> 00:09:11.800
 in the amount of funds that were attributed

00:09:11.800 --> 00:09:13.900
 to residential departments.

00:09:13.900 --> 00:09:17.680
 - And was that internal direction

00:09:17.680 --> 00:09:19.800
 or direction from city council, or?

00:09:19.800 --> 00:09:21.660
 - This was city council direction.

00:09:21.660 --> 00:09:27.040
 - I was just curious if you had any demographics

00:09:27.040 --> 00:09:31.600
 regarding the debt, particular sectors, students, residents?

00:09:31.600 --> 00:09:35.200
 - Actually, we did provide some demographics

00:09:35.200 --> 00:09:38.400
 in terms of, we took an overlay

00:09:38.400 --> 00:09:42.520
 of the different income areas based on census data,

00:09:42.520 --> 00:09:45.800
 and overlaid that with the uncollectible debt,

00:09:45.800 --> 00:09:48.320
 and found that there was not a specific trend

00:09:48.320 --> 00:09:49.700
 one way or the other.

00:09:49.700 --> 00:09:54.480
 - Any other questions?

00:09:54.480 --> 00:09:58.320
 Did you get what you need from us?

00:09:58.320 --> 00:09:59.160
 - Absolutely.

00:09:59.160 --> 00:10:00.000
 - Okay, thank you.

00:10:00.000 --> 00:10:01.100
 - Thank you very much.

00:10:01.100 --> 00:10:03.560
 - You did have another question, did you?

00:10:03.560 --> 00:10:05.220
 - No. - Okay.

00:10:05.220 --> 00:10:07.600
 - The next item is receive a presentation,

00:10:07.600 --> 00:10:10.000
 and hold and discuss a discussion

00:10:10.000 --> 00:10:13.160
 regarding the water and wastewater cost of service study.

00:10:13.160 --> 00:10:14.920
 - Good morning, PUB Chair,

00:10:14.920 --> 00:10:17.720
 Nick Benson, Assistant Director of Finance.

00:10:17.720 --> 00:10:19.640
 I have a brief presentation for you this morning

00:10:19.640 --> 00:10:21.600
 to review the cost of service and rate design study

00:10:21.600 --> 00:10:23.320
 that we're currently in the process of updating

00:10:23.320 --> 00:10:24.840
 for water and wastewater.

00:10:24.840 --> 00:10:26.640
 If you have any questions, feel free to ask me.

00:10:26.640 --> 00:10:28.400
 I can address there's plenty of staff

00:10:28.400 --> 00:10:30.400
 that you have appeared to address, so.

00:10:30.400 --> 00:10:34.720
 A quick overview of the presentation,

00:10:34.720 --> 00:10:36.640
 so we will walk you through the cost of service

00:10:36.640 --> 00:10:39.160
 and rate design process and what that looks like.

00:10:39.160 --> 00:10:41.120
 We will also identify the process

00:10:41.120 --> 00:10:42.720
 of identifying our revenue requirements.

00:10:42.720 --> 00:10:44.920
 So how much revenue do we need from each customer class

00:10:44.920 --> 00:10:46.720
 from water and wastewater to cover our cost

00:10:46.720 --> 00:10:47.800
 of providing service.

00:10:47.800 --> 00:10:50.440
 We'll also review the pricing objectives

00:10:50.440 --> 00:10:52.400
 that are currently identified in this study,

00:10:52.400 --> 00:10:53.720
 the existing one and the new one

00:10:53.720 --> 00:10:55.640
 that we're currently in the process of updating,

00:10:55.640 --> 00:10:57.640
 and also review the next steps with you.

00:10:57.640 --> 00:11:02.640
 So the cost of service and rate design process

00:11:02.640 --> 00:11:06.120
 in the fall of 2019, the city contacted with TELUS

00:11:06.120 --> 00:11:07.600
 to update the city's cost of service

00:11:07.600 --> 00:11:09.160
 and rate design study,

00:11:09.160 --> 00:11:11.080
 and this study is updated every five years.

00:11:11.080 --> 00:11:12.520
 The current study that is in place

00:11:12.520 --> 00:11:14.520
 in the financial model that we're using

00:11:14.520 --> 00:11:16.800
 must be in place in 2015.

00:11:16.800 --> 00:11:20.440
 The current study period will take us from 2020 to 2025,

00:11:20.440 --> 00:11:22.240
 and the cost of service and rate design study

00:11:22.240 --> 00:11:25.240
 is basically meant to identify the revenue requirements

00:11:25.240 --> 00:11:26.920
 of the water and wastewater utilities

00:11:26.920 --> 00:11:30.120
 where we know what rate to charge to recover our cost.

00:11:30.120 --> 00:11:32.000
 We are also using principles identified

00:11:32.000 --> 00:11:34.000
 by the American Water Works Association,

00:11:34.000 --> 00:11:36.400
 also referred to as AWWA.

00:11:36.400 --> 00:11:38.720
 This organization is used by several utilities

00:11:38.720 --> 00:11:40.040
 on the water and wastewater side

00:11:40.040 --> 00:11:41.880
 when benchmarking their rates

00:11:41.880 --> 00:11:44.040
 with similar municipalities around the area.

00:11:44.040 --> 00:11:49.440
 So the cost of service process,

00:11:49.440 --> 00:11:51.840
 this table writes it down to five simple steps.

00:11:51.840 --> 00:11:54.400
 You can see step number one being at the bottom,

00:11:54.400 --> 00:11:55.920
 step number five being at the top.

00:11:55.920 --> 00:11:59.380
 So we are currently working on step number one through three.

00:11:59.380 --> 00:12:00.220
 Here pretty soon,

00:12:00.220 --> 00:12:02.080
 we will be working on the design and the rate structure.

00:12:02.080 --> 00:12:03.720
 That's why we're here talking to you today

00:12:03.720 --> 00:12:05.520
 about how the rates are structured

00:12:05.520 --> 00:12:07.640
 and what our pricing objectives are.

00:12:07.640 --> 00:12:10.800
 Step number five, we do anticipate finishing the study

00:12:10.800 --> 00:12:13.280
 and bringing it back to the PUV and city council

00:12:13.280 --> 00:12:15.520
 this upcoming summer, so summer of 2020.

00:12:15.520 --> 00:12:22.240
 Now this diagram outlines the different elements

00:12:22.240 --> 00:12:24.560
 that go into identifying the revenue requirements

00:12:24.560 --> 00:12:26.920
 for the different customer classes.

00:12:26.920 --> 00:12:28.360
 So starting on the left-hand side here,

00:12:28.360 --> 00:12:30.200
 you can see the O&M budgets.

00:12:30.200 --> 00:12:31.520
 So over the last couple of months,

00:12:31.520 --> 00:12:33.240
 we have been setting our operating budgets

00:12:33.240 --> 00:12:35.120
 that are approved by the PUV and city council

00:12:35.120 --> 00:12:37.980
 to tell us to update the financial model.

00:12:37.980 --> 00:12:40.880
 We have also sent them our capital budgets

00:12:40.880 --> 00:12:41.980
 for a five-year period.

00:12:41.980 --> 00:12:43.520
 We do budget every capital budget,

00:12:43.520 --> 00:12:46.320
 water and waste water in a five-year period.

00:12:46.320 --> 00:12:48.840
 Transfers to reserves, we do have that built in here also

00:12:48.840 --> 00:12:51.000
 when identifying our revenue requirements.

00:12:51.000 --> 00:12:53.400
 And then we did consider key factors such as inflation,

00:12:53.400 --> 00:12:55.280
 interest rates, and finance in these projects.

00:12:55.280 --> 00:12:57.800
 So as we get further out of that five-year period,

00:12:57.800 --> 00:12:59.840
 the project cost typically increases.

00:12:59.840 --> 00:13:02.660
 So we are building that into the financial model.

00:13:02.660 --> 00:13:04.920
 Financial policies, we also are considering

00:13:04.920 --> 00:13:07.460
 our debt coverage ratio and our financial reserves

00:13:07.460 --> 00:13:09.320
 in water and waste water when looking at our rates

00:13:09.320 --> 00:13:10.560
 that we're setting.

00:13:10.560 --> 00:13:12.520
 Now I think the one important thing to point out too

00:13:12.520 --> 00:13:14.320
 is that both water and waste water have revenue

00:13:14.320 --> 00:13:16.060
 that are non-rate related.

00:13:16.060 --> 00:13:18.240
 We are backing those revenues out of the utilities

00:13:18.240 --> 00:13:21.000
 not to skew the numbers one way or the other.

00:13:21.000 --> 00:13:27.040
 So the current pricing structure and pricing objectives

00:13:27.040 --> 00:13:28.600
 and the main reason we want to talk to you today,

00:13:28.600 --> 00:13:31.040
 so the current pricing model that we have in place

00:13:31.040 --> 00:13:33.360
 has two main pricing objectives.

00:13:33.360 --> 00:13:35.280
 The first will be in a tiered pricing structure

00:13:35.280 --> 00:13:37.520
 to incentivize water conservation

00:13:37.520 --> 00:13:39.000
 and the second one being establishment

00:13:39.000 --> 00:13:40.800
 of cost of service based rates.

00:13:40.800 --> 00:13:42.520
 So this working model that we are currently

00:13:42.520 --> 00:13:45.040
 in the process of updating, we do use it every year

00:13:45.040 --> 00:13:47.280
 to input our operating budgets into

00:13:47.280 --> 00:13:48.800
 and then come up with a cost of service rate

00:13:48.800 --> 00:13:50.720
 that we can use for wholesale customers

00:13:50.720 --> 00:13:53.360
 and residential customers and so forth.

00:13:53.360 --> 00:13:55.320
 I kind of want to give everybody a couple examples

00:13:55.320 --> 00:13:56.600
 of the residential rate structure

00:13:56.600 --> 00:13:59.200
 and how the water conservation comes into play

00:13:59.200 --> 00:14:01.040
 when we set our residential rates.

00:14:01.040 --> 00:14:03.720
 So you can see wastewater customers are here at the top.

00:14:03.720 --> 00:14:05.880
 There are two components to a wastewater bill

00:14:05.880 --> 00:14:07.240
 that are billed each month.

00:14:07.240 --> 00:14:08.720
 The first one being a facility charge

00:14:08.720 --> 00:14:11.560
 which is a fixed fee of $11 a month.

00:14:11.560 --> 00:14:13.160
 You can see that here.

00:14:13.160 --> 00:14:14.640
 And the second one being a volume charge

00:14:14.640 --> 00:14:16.920
 of three per thousand gallons.

00:14:16.920 --> 00:14:20.080
 I want to point out that wastewater is a non-metered service.

00:14:20.080 --> 00:14:21.640
 So what we do to get the volume

00:14:21.640 --> 00:14:23.520
 and the billable volume for wastewater customers

00:14:23.520 --> 00:14:25.880
 is based off their water usage.

00:14:25.880 --> 00:14:29.160
 We actually call that an average daily usage

00:14:29.160 --> 00:14:30.520
 and that's established during the months

00:14:30.520 --> 00:14:33.360
 of December, January, and February.

00:14:33.360 --> 00:14:35.800
 If a household does not have that established usage

00:14:35.800 --> 00:14:38.560
 so someone wants to move in a house in June,

00:14:38.560 --> 00:14:40.800
 we would use a minimum of 5,400 gallons

00:14:40.800 --> 00:14:42.920
 until that average is established.

00:14:42.920 --> 00:14:44.360
 The average of 5,400 gallons,

00:14:44.360 --> 00:14:45.560
 if you remember in the budgeting process,

00:14:45.560 --> 00:14:48.560
 we actually decreased it from 6,000 to 5,400

00:14:48.560 --> 00:14:49.720
 about a year and a half ago.

00:14:49.720 --> 00:14:53.160
 So that's what the PDB and city council decided to do.

00:14:53.160 --> 00:14:54.840
 Oh, water is similar to wastewater.

00:14:54.840 --> 00:14:57.680
 We do have a facility charge that you can see here of $16.

00:14:57.680 --> 00:14:59.000
 So a little bit more.

00:14:59.000 --> 00:15:00.680
 This is for a three quarter inch meter.

00:15:00.680 --> 00:15:02.440
 This is the most typical size meter

00:15:02.440 --> 00:15:04.920
 for residential customers in the city.

00:15:04.920 --> 00:15:06.520
 And the volume charge is a little bit different

00:15:06.520 --> 00:15:07.960
 for water customers.

00:15:07.960 --> 00:15:10.520
 We do break it into two different times of the year

00:15:10.520 --> 00:15:12.480
 so you can see a winter rate and a summer rate.

00:15:12.480 --> 00:15:16.320
 So as people start irrigating their yards more in the summer

00:15:16.320 --> 00:15:17.720
 and the rate does increase a little bit

00:15:17.720 --> 00:15:19.800
 as your water usage increases.

00:15:19.800 --> 00:15:22.600
 So you can see a customer using zero to 15,000 gallons

00:15:22.600 --> 00:15:26.040
 is being charged 415 per 1,000 gallon.

00:15:26.040 --> 00:15:30.400
 Over 50,000 gallons, you can see is 1090 per 1,000 gallons.

00:15:30.400 --> 00:15:31.760
 Also kind of want to show everybody

00:15:31.760 --> 00:15:35.320
 where the majority of our customers are in these tiers.

00:15:35.320 --> 00:15:37.320
 You can see the zero to 15,000 gallons

00:15:37.320 --> 00:15:39.520
 is the majority of the customers.

00:15:39.520 --> 00:15:41.520
 This is 2.7 billion gallons.

00:15:41.520 --> 00:15:44.200
 I know this says 2.7 million, but it's in thousands.

00:15:44.200 --> 00:15:46.640
 So 2.7 billion gallons of water

00:15:46.640 --> 00:15:49.240
 in that first tier of zero to 15,000 gallons.

00:15:49.240 --> 00:15:52.680
 It accounts for about 17.4 million in revenue.

00:15:52.680 --> 00:15:59.480
 So the next step, so we are here talking to you today

00:15:59.480 --> 00:16:01.160
 about where we are in the cost of service model.

00:16:01.160 --> 00:16:03.280
 So like I said, we have been working with Retellis

00:16:03.280 --> 00:16:06.960
 since the fall of 2019 to update this model.

00:16:06.960 --> 00:16:09.120
 They will be providing us a financial model

00:16:09.120 --> 00:16:11.320
 we can work with throughout the budgeting year

00:16:11.320 --> 00:16:13.400
 as we come back to you with those budgets each year

00:16:13.400 --> 00:16:15.280
 from the five year period.

00:16:15.280 --> 00:16:18.120
 We do anticipate this to be done around the summer.

00:16:18.120 --> 00:16:20.640
 So June, 2020 coming back to the Public Utility Board

00:16:20.640 --> 00:16:24.080
 and City Council with that final product for your review

00:16:24.080 --> 00:16:25.520
 and then final adoption of the rights

00:16:25.520 --> 00:16:27.720
 will be in September along with the budget.

00:16:27.720 --> 00:16:32.640
 And with that, that concludes the presentation.

00:16:32.640 --> 00:16:33.480
 - Questions?

00:16:33.480 --> 00:16:39.480
 - I was just curious as to what you folks

00:16:39.480 --> 00:16:42.800
 tell people to do to conserve water.

00:16:42.800 --> 00:16:47.800
 Are there publicized policies and suggestions?

00:16:47.800 --> 00:16:50.680
 Anything tied in with the sustainability program,

00:16:50.680 --> 00:16:52.240
 anything like that?

00:16:52.240 --> 00:16:53.800
 - Let me ask Dr. Banks to look here

00:16:53.800 --> 00:16:55.680
 and address that question really quick.

00:16:55.680 --> 00:17:03.960
 - Good morning board members.

00:17:03.960 --> 00:17:06.520
 Ken Banks, General Manager of Utilities.

00:17:06.520 --> 00:17:10.160
 To address your question, the sustainability group

00:17:10.160 --> 00:17:11.680
 has an energy audit program

00:17:11.680 --> 00:17:14.280
 that also includes a water audit.

00:17:14.280 --> 00:17:16.240
 And so typically when we go out,

00:17:16.240 --> 00:17:18.600
 we'll perform both of those services

00:17:18.600 --> 00:17:20.640
 for a requesting individual.

00:17:20.640 --> 00:17:23.600
 And those, the water audit in particular

00:17:23.600 --> 00:17:27.280
 will be focused on irrigation, indoor plumbing,

00:17:27.280 --> 00:17:30.600
 all types of things to help people understand

00:17:30.600 --> 00:17:31.880
 how they can conserve water

00:17:31.880 --> 00:17:33.560
 to manage their systems better.

00:17:33.560 --> 00:17:39.520
 We also have several types of messaging

00:17:39.520 --> 00:17:41.800
 with regards to water conservation.

00:17:41.800 --> 00:17:44.880
 We have a drought contingency plan as well

00:17:44.880 --> 00:17:46.520
 that will enact certain policies

00:17:46.520 --> 00:17:48.840
 if we end up getting into a situation

00:17:48.840 --> 00:17:51.960
 where we have concerns about water usage.

00:17:51.960 --> 00:17:53.880
 Typically we don't get there,

00:17:53.880 --> 00:17:56.880
 but we certainly have those policies in place.

00:17:56.880 --> 00:17:59.320
 So those are a few examples.

00:17:59.320 --> 00:18:02.000
 We put on workshops on water conservation

00:18:02.000 --> 00:18:05.080
 through the sustainability group and sustainable schools.

00:18:05.080 --> 00:18:07.360
 So there's a lot of different elements.

00:18:07.360 --> 00:18:11.120
 And just to point out too, as Nick went over,

00:18:11.120 --> 00:18:13.840
 our entire pricing structure on the water side

00:18:13.840 --> 00:18:16.400
 is geared towards conservation.

00:18:16.400 --> 00:18:20.000
 So the more water you use within those tiers,

00:18:20.000 --> 00:18:23.640
 the more amount you're going to pay on a per-gallon basis.

00:18:23.640 --> 00:18:24.720
 - Thank you. - Sure.

00:18:24.720 --> 00:18:29.480
 - Where did the direction come from

00:18:29.480 --> 00:18:34.360
 to have this tiered pricing in terms of,

00:18:34.360 --> 00:18:38.760
 it seems to me that the low end is extremely cheap

00:18:38.760 --> 00:18:43.080
 if you could get less than 15,000 gallons of water,

00:18:43.080 --> 00:18:47.240
 you've got a way of a deal at the other extreme

00:18:47.240 --> 00:18:52.160
 over a penny a gallon seems pretty high.

00:18:52.160 --> 00:18:54.880
 I also do business in the desert

00:18:54.880 --> 00:18:58.680
 and our rates aren't quite to that level yet

00:18:58.680 --> 00:19:03.360
 where water is truly scarce, right?

00:19:03.360 --> 00:19:05.040
 Who gives you direction in terms of,

00:19:05.040 --> 00:19:08.000
 'cause obviously it's a judgment call at that point

00:19:08.000 --> 00:19:10.400
 to see how punitive you get at the high end

00:19:10.400 --> 00:19:13.160
 and how subsidizing you get the low end.

00:19:13.160 --> 00:19:15.400
 - And that's a conversation we'll have with the consultant

00:19:15.400 --> 00:19:17.720
 when he comes back in the summer of 2020.

00:19:17.720 --> 00:19:18.960
 So who gives us direction?

00:19:18.960 --> 00:19:21.200
 It'll be the Public Utility Board and the City Council.

00:19:21.200 --> 00:19:23.200
 So we work with the consultant to update

00:19:23.200 --> 00:19:24.800
 that financial model, we bring it forward

00:19:24.800 --> 00:19:26.360
 to the Public Utility Board and City Council

00:19:26.360 --> 00:19:27.600
 with further direction.

00:19:27.600 --> 00:19:29.240
 But these two pricing objectives

00:19:29.240 --> 00:19:31.240
 are what that model is based off of.

00:19:31.240 --> 00:19:33.040
 So I think the answer to your question would be,

00:19:33.040 --> 00:19:34.760
 we get that direction from the Public Utility Board

00:19:34.760 --> 00:19:38.440
 and City Council during the budgeting process annually

00:19:38.440 --> 00:19:40.080
 and during the rate setting process annually.

00:19:40.080 --> 00:19:42.400
 So as we kick off that season,

00:19:42.400 --> 00:19:44.720
 May, June time period comes along

00:19:44.720 --> 00:19:46.800
 and those are conversations we'll have with you.

00:19:46.800 --> 00:19:48.640
 And we'll definitely talk about that.

00:19:48.640 --> 00:19:53.520
 - Any other questions?

00:19:53.520 --> 00:19:56.680
 All right, thank you. - Thank you.

00:19:56.680 --> 00:19:59.200
 - And then the next item is receive a report

00:19:59.200 --> 00:20:01.200
 and hold a discussion regarding the following

00:20:01.200 --> 00:20:04.360
 with respect to green tree estates.

00:20:04.360 --> 00:20:07.040
 And there's five alternatives I'm not gonna read them all.

00:20:10.880 --> 00:20:13.560
 (clears throat)

00:20:13.560 --> 00:20:21.080
 - And it is quite a caption sub.

00:20:21.080 --> 00:20:22.320
 Members of the board, Ryan Adams,

00:20:22.320 --> 00:20:24.440
 Deputy Director of Public Affairs.

00:20:24.440 --> 00:20:26.800
 And this presentation is really to give the board

00:20:26.800 --> 00:20:30.600
 an update on the status of the water provision

00:20:30.600 --> 00:20:33.600
 at green tree estates and to walk through

00:20:33.600 --> 00:20:35.800
 some of the recent events and the direction

00:20:35.800 --> 00:20:37.480
 the council provided at the most recent meeting

00:20:37.480 --> 00:20:40.240
 on February 4th, and then also to answer any questions

00:20:40.240 --> 00:20:41.600
 that the board might have.

00:20:41.600 --> 00:20:46.800
 So this was back on February 4th.

00:20:46.800 --> 00:20:48.920
 The staff provided council update

00:20:48.920 --> 00:20:50.480
 on the status of green tree estates.

00:20:50.480 --> 00:20:53.640
 And as a very brief overview,

00:20:53.640 --> 00:20:56.000
 the residents of green tree estates

00:20:56.000 --> 00:21:00.400
 were served by a private water supplier from a well.

00:21:00.400 --> 00:21:03.040
 That water supplier ceased that water supply.

00:21:03.040 --> 00:21:04.560
 They were left without water.

00:21:04.560 --> 00:21:05.560
 Over the course of the fall,

00:21:05.560 --> 00:21:08.000
 the city met with the numerous times

00:21:08.000 --> 00:21:12.680
 and made a determination in November to declare a disaster

00:21:12.680 --> 00:21:16.320
 so that the city could provide water on a temporary basis,

00:21:16.320 --> 00:21:18.720
 three times per week, non-potable water,

00:21:18.720 --> 00:21:20.720
 and then to make potable or drinkable water

00:21:20.720 --> 00:21:22.400
 available to the residents.

00:21:22.400 --> 00:21:26.520
 So on February 4th, staff updated the council

00:21:26.520 --> 00:21:31.360
 on the work session that they held on December 10th.

00:21:31.360 --> 00:21:33.560
 The results of that and the progress staff

00:21:33.560 --> 00:21:37.400
 had made since then, status update was provided.

00:21:37.400 --> 00:21:39.000
 We also described to council

00:21:39.000 --> 00:21:41.360
 what would happen beginning February 13th

00:21:41.360 --> 00:21:43.720
 once the original declaration of disaster

00:21:43.720 --> 00:21:45.640
 was set to expire.

00:21:45.640 --> 00:21:47.320
 We also explained the steps for residents

00:21:47.320 --> 00:21:48.640
 connected to the city water system

00:21:48.640 --> 00:21:50.600
 and just other issues for the council to consider

00:21:50.600 --> 00:21:52.160
 at that meeting, which they did.

00:21:52.160 --> 00:21:58.160
 So as a summary, on December 10th, council directed staff

00:21:58.160 --> 00:22:00.440
 that they would extend the declaration of disaster

00:22:00.440 --> 00:22:03.320
 originally slated to expire on February 12th

00:22:03.320 --> 00:22:04.880
 for an additional 100 days,

00:22:04.880 --> 00:22:07.320
 and that would bring it to May 22nd.

00:22:07.320 --> 00:22:09.640
 That's the last day of that declaration.

00:22:09.640 --> 00:22:12.320
 They also directed staff to begin billing residents

00:22:12.320 --> 00:22:14.840
 beginning February 13th,

00:22:14.840 --> 00:22:18.560
 or day one of that additional 100-day extension.

00:22:18.560 --> 00:22:21.880
 They asked staff to offer voluntary courtesy inspections

00:22:21.880 --> 00:22:23.720
 and to provide code compliance information.

00:22:23.720 --> 00:22:25.720
 So essentially, let residents know

00:22:25.720 --> 00:22:28.120
 that we're happy to come inspect your house

00:22:28.120 --> 00:22:29.880
 the way we would if we were going to connect

00:22:29.880 --> 00:22:31.240
 to the water system,

00:22:31.240 --> 00:22:33.520
 and to provide any other code compliance information

00:22:33.520 --> 00:22:34.680
 that they needed.

00:22:34.680 --> 00:22:37.800
 And that we would also address life, safety,

00:22:37.800 --> 00:22:40.120
 and health issues with non-occupied structures.

00:22:40.120 --> 00:22:41.640
 And if you go out to Green Tree Estates,

00:22:41.640 --> 00:22:44.560
 there are a number of structures on various properties.

00:22:44.560 --> 00:22:47.040
 They are quite obviously non-occupied.

00:22:47.040 --> 00:22:50.520
 They are very substandard.

00:22:50.520 --> 00:22:54.080
 And so staff began the process of enforcement on those

00:22:54.080 --> 00:22:57.800
 'cause they are clear hazards to the public,

00:22:57.800 --> 00:23:02.240
 and what we would term an attractive nuisance.

00:23:02.240 --> 00:23:07.400
 Also, at that December 10th meeting,

00:23:07.400 --> 00:23:09.560
 the city requested that residents and property owners

00:23:09.560 --> 00:23:13.160
 of Green Tree Estates assist in providing some information,

00:23:13.160 --> 00:23:15.480
 including the confirmation of ownership

00:23:15.480 --> 00:23:18.040
 of all Green Tree Estates roads and easements.

00:23:18.040 --> 00:23:20.800
 And I will note that they did provide

00:23:20.800 --> 00:23:23.320
 what they are going to consider that confirmation

00:23:23.320 --> 00:23:25.520
 just prior to this meeting, so there is an X there,

00:23:25.520 --> 00:23:29.120
 but pay no attention to that X.

00:23:29.120 --> 00:23:31.640
 To confirm ownership of all Green Tree Estates lots,

00:23:31.640 --> 00:23:34.480
 we are in the process of continuing to do that.

00:23:34.480 --> 00:23:36.680
 Confirm which lots are owner-occupied.

00:23:36.680 --> 00:23:40.560
 This is important as we will have to work with all owners

00:23:40.560 --> 00:23:44.000
 to actually connect them to the city water system,

00:23:44.000 --> 00:23:47.000
 but we cannot work with the residents if they rent.

00:23:47.000 --> 00:23:48.760
 Confirm which property owners are interested

00:23:48.760 --> 00:23:51.000
 in connecting to a water meter

00:23:51.000 --> 00:23:53.080
 at the Green Tree Estates boundary.

00:23:53.080 --> 00:23:55.720
 Schedule courtesy inspections and to begin paying for water

00:23:55.720 --> 00:23:57.560
 on February 13th.

00:23:57.560 --> 00:23:59.560
 And just as a little bit of a background,

00:23:59.560 --> 00:24:02.720
 the solution that staff devised to provide permanent water

00:24:02.720 --> 00:24:04.120
 to the residents of Green Tree Estates

00:24:04.120 --> 00:24:07.560
 is to place a meter at the neighborhood boundary.

00:24:07.560 --> 00:24:09.440
 All the property within the neighborhood is private,

00:24:09.440 --> 00:24:11.240
 there are no public rights away,

00:24:11.240 --> 00:24:14.200
 and each individual property owner will be charged

00:24:14.200 --> 00:24:17.120
 to run a service line from the residents

00:24:17.120 --> 00:24:18.880
 all the way to the meter.

00:24:18.880 --> 00:24:22.520
 It could be 40 feet, it could be 200 feet,

00:24:22.520 --> 00:24:24.920
 but it would be essentially a long service line.

00:24:24.920 --> 00:24:32.000
 Staff did engage the residents in two small group meetings

00:24:32.000 --> 00:24:33.240
 between the December 10th

00:24:33.240 --> 00:24:35.320
 and the February 4th council meetings.

00:24:35.320 --> 00:24:38.480
 One on December 19th, where we essentially discussed

00:24:38.480 --> 00:24:40.320
 the courtesy inspections and the results

00:24:40.320 --> 00:24:41.640
 from that December 10th meeting.

00:24:41.640 --> 00:24:43.160
 And we also met with them on February 3rd,

00:24:43.160 --> 00:24:45.920
 just before that February 4th council work session,

00:24:45.920 --> 00:24:49.040
 where we previewed what we would discuss with council,

00:24:49.040 --> 00:24:52.960
 also reviewed how we would prepay for water services,

00:24:52.960 --> 00:24:55.560
 so residents can pay ahead of time,

00:24:55.560 --> 00:24:58.440
 it's a set amount of water they receive, a set cost.

00:24:58.440 --> 00:25:01.760
 This way it does not obligate them to create an account

00:25:01.760 --> 00:25:03.640
 and go through a credit check.

00:25:03.640 --> 00:25:05.640
 And then we also answered any questions that they had,

00:25:05.640 --> 00:25:07.840
 and they had some related to inspections

00:25:07.840 --> 00:25:08.960
 and some other items.

00:25:08.960 --> 00:25:14.480
 So the current status, the city has expended,

00:25:14.480 --> 00:25:17.920
 under the declaration of disaster, just over $30,000

00:25:17.920 --> 00:25:20.760
 to provide water to Greenery estates.

00:25:20.760 --> 00:25:23.400
 This does include some one-time purchases of gallons,

00:25:23.400 --> 00:25:25.840
 or pardon me, 275 gallon tanks,

00:25:25.840 --> 00:25:28.480
 and also some improvements to the roads there,

00:25:28.480 --> 00:25:30.760
 so that we could bring a heavy water truck

00:25:30.760 --> 00:25:32.320
 to deliver that water.

00:25:32.320 --> 00:25:36.240
 It does not include staff time for salaried staff.

00:25:36.240 --> 00:25:40.000
 So we capture the hourly wages of the workers who go,

00:25:40.000 --> 00:25:41.480
 the employees who go and deliver that water,

00:25:41.480 --> 00:25:45.360
 but any other staff time by, say, department directors,

00:25:45.360 --> 00:25:47.680
 that's not captured in that number.

00:25:47.680 --> 00:25:50.880
 The disaster declaration was on the agenda on February 4th.

00:25:50.880 --> 00:25:52.280
 It was approved by council,

00:25:52.280 --> 00:25:54.680
 so it has been extended through May 22nd.

00:25:54.680 --> 00:25:58.480
 The residents are gonna be receiving bills

00:25:58.480 --> 00:25:59.320
 for water service.

00:25:59.320 --> 00:26:02.000
 They started receiving those last week.

00:26:02.000 --> 00:26:05.480
 The city, again, is addressing those non-occupied,

00:26:05.480 --> 00:26:07.560
 attractive nuisances.

00:26:07.560 --> 00:26:09.480
 We have not received, again, all the information

00:26:09.480 --> 00:26:12.680
 that was requested by council, although we have received some

00:26:12.680 --> 00:26:14.360
 and we are continuing to work with the residents

00:26:14.360 --> 00:26:15.480
 to get the rest.

00:26:15.480 --> 00:26:16.600
 - Can I ask a question?

00:26:16.600 --> 00:26:17.440
 - Yes, sir.

00:26:17.440 --> 00:26:19.480
 - What is an attractive nuisance?

00:26:19.480 --> 00:26:24.360
 - So I'm not sure if that is a well-defined term,

00:26:24.360 --> 00:26:28.080
 but it's essentially something used to denote a structure

00:26:28.080 --> 00:26:31.640
 that is substandard, so it is a nuisance,

00:26:31.640 --> 00:26:36.640
 but it is open so that humans on down to,

00:26:36.640 --> 00:26:42.080
 say, small animals can go in there to seek cover from,

00:26:42.080 --> 00:26:43.400
 say, the elements of the weather.

00:26:43.400 --> 00:26:48.400
 So you then have either a disease problem

00:26:48.400 --> 00:26:51.520
 with your small animals or a public health hazard,

00:26:51.520 --> 00:26:54.680
 safety hazard, if people live in these

00:26:54.680 --> 00:26:56.280
 substandard structures.

00:26:56.280 --> 00:26:58.040
 One strong windstorm, they could fall over

00:26:58.040 --> 00:26:59.480
 and crush who's ever inside.

00:26:59.480 --> 00:27:03.160
 So attractive nuisance is a kind of a catch-all term

00:27:03.160 --> 00:27:05.400
 because they all are different in their own ways,

00:27:05.400 --> 00:27:07.720
 but essentially it's a substandard structure

00:27:07.720 --> 00:27:09.440
 that someone can access.

00:27:12.000 --> 00:27:14.040
 - Why don't they just call it that, then?

00:27:14.040 --> 00:27:17.400
 - To be perfectly blunt with you,

00:27:17.400 --> 00:27:18.960
 I may have used attractive nuisance

00:27:18.960 --> 00:27:20.640
 to save space on the PowerPoint.

00:27:20.640 --> 00:27:23.480
 - Okay, thanks.

00:27:23.480 --> 00:27:24.320
 - You got it.

00:27:24.320 --> 00:27:31.920
 And at the time, the city had not received any requests

00:27:31.920 --> 00:27:33.960
 for voluntary inspections.

00:27:33.960 --> 00:27:38.320
 The residents did let us know that they have reached out

00:27:38.320 --> 00:27:40.760
 and are working with a third-party inspector

00:27:40.760 --> 00:27:43.360
 to provide them guidance on what improvements

00:27:43.360 --> 00:27:45.240
 that they may need to make to the residences

00:27:45.240 --> 00:27:46.200
 to connect to city water.

00:27:46.200 --> 00:27:49.080
 Now, the city will not accept those,

00:27:49.080 --> 00:27:52.240
 but it gives them a head start,

00:27:52.240 --> 00:27:54.120
 and the city will come when they want to connect

00:27:54.120 --> 00:27:55.760
 and do our own inspection,

00:27:55.760 --> 00:27:57.520
 as required by state and local law.

00:27:57.520 --> 00:28:01.920
 So beginning February 13th,

00:28:01.920 --> 00:28:04.160
 residents will be billed for water.

00:28:04.160 --> 00:28:05.480
 Again, it's pre-billed.

00:28:05.480 --> 00:28:07.840
 If they do not pay by the due date,

00:28:07.840 --> 00:28:11.920
 they do not receive water delivered to their large tanks.

00:28:11.920 --> 00:28:14.200
 The residents, pardon me,

00:28:14.200 --> 00:28:15.760
 paying late will receive service

00:28:15.760 --> 00:28:18.040
 on the next scheduled delivery dates.

00:28:18.040 --> 00:28:21.000
 The cost per week, although they will be billed monthly,

00:28:21.000 --> 00:28:23.400
 the cost per week is $9.43.

00:28:23.400 --> 00:28:25.960
 If the household has two large containers,

00:28:25.960 --> 00:28:27.920
 just over $5 if they have one,

00:28:27.920 --> 00:28:30.320
 and these are the prevailing water rates of the city.

00:28:30.320 --> 00:28:32.080
 So they pay the same water rate

00:28:32.080 --> 00:28:34.200
 that every other Denver customer does.

00:28:37.680 --> 00:28:39.720
 So this is a very scaled-down,

00:28:39.720 --> 00:28:41.400
 simplified version of the process,

00:28:41.400 --> 00:28:43.040
 but for the residents, pardon me,

00:28:43.040 --> 00:28:44.600
 the property owners of Green Tree States

00:28:44.600 --> 00:28:46.560
 to connect to the water system,

00:28:46.560 --> 00:28:50.920
 they would have to request and pass an initial inspection

00:28:50.920 --> 00:28:53.320
 for us to determine if they can be connected,

00:28:53.320 --> 00:28:56.280
 if it poses no risk to the system,

00:28:56.280 --> 00:28:58.760
 a customer service inspection.

00:28:58.760 --> 00:29:00.040
 They would then contact the city

00:29:00.040 --> 00:29:01.280
 to request that water meter.

00:29:01.280 --> 00:29:03.880
 They would have to pay all service meter and tap fees,

00:29:03.880 --> 00:29:05.320
 just like any other resident

00:29:05.320 --> 00:29:06.920
 who makes that similar request.

00:29:08.000 --> 00:29:11.880
 They would have to receive a permit for the work,

00:29:11.880 --> 00:29:14.480
 have a plumber perform the work

00:29:14.480 --> 00:29:16.240
 for those areas where a plumber is required,

00:29:16.240 --> 00:29:17.680
 a licensed plumber.

00:29:17.680 --> 00:29:21.560
 It must be inspected and must pass inspection by the city.

00:29:21.560 --> 00:29:23.400
 And then they would set up a billing account,

00:29:23.400 --> 00:29:24.960
 just like any other residents,

00:29:24.960 --> 00:29:26.440
 so that they would be billed in arrears.

00:29:26.440 --> 00:29:27.840
 You use this much for a month,

00:29:27.840 --> 00:29:28.880
 you get your bill the next month,

00:29:28.880 --> 00:29:31.400
 and you pay whatever it is you used.

00:29:31.400 --> 00:29:37.640
 So on May 23rd, 2020, currently,

00:29:37.640 --> 00:29:40.400
 the declaration of disaster will expire.

00:29:40.400 --> 00:29:42.040
 The city's water service,

00:29:42.040 --> 00:29:44.480
 the temporary water service will cease,

00:29:44.480 --> 00:29:46.200
 and the city will lose its ability

00:29:46.200 --> 00:29:48.880
 to lawfully access the properties to deliver water.

00:29:48.880 --> 00:29:53.480
 The resident representatives of Green Tree States

00:29:53.480 --> 00:29:56.200
 did request to council that they would like to see

00:29:56.200 --> 00:29:58.360
 the declaration of disaster extended.

00:29:58.360 --> 00:30:02.440
 The date they gave was to May of 2021.

00:30:02.440 --> 00:30:05.400
 Council received that request,

00:30:05.400 --> 00:30:08.440
 but did not discuss it and did not act on it at that meeting.

00:30:08.440 --> 00:30:16.720
 We also presented several issues to consider.

00:30:16.720 --> 00:30:17.720
 What happens, of course,

00:30:17.720 --> 00:30:19.200
 is residents do not pay for water.

00:30:19.200 --> 00:30:20.640
 As I previously mentioned,

00:30:20.640 --> 00:30:23.800
 they will receive no temporary water service.

00:30:23.800 --> 00:30:25.960
 If they do not receive any courtesy inspections,

00:30:25.960 --> 00:30:28.920
 they do so, again, at their own risk,

00:30:28.920 --> 00:30:30.920
 because the city, when we do our initial inspection,

00:30:30.920 --> 00:30:33.840
 may find something that their third-party inspector

00:30:33.840 --> 00:30:36.320
 did not find that they would have to then comply with

00:30:36.320 --> 00:30:38.720
 in order to connect with the city water system.

00:30:38.720 --> 00:30:41.760
 What happens if they do not make code improvements

00:30:41.760 --> 00:30:42.600
 as required?

00:30:42.600 --> 00:30:45.520
 Simply, they cannot connect to city water.

00:30:45.520 --> 00:30:46.840
 And what happens if property owners

00:30:46.840 --> 00:30:48.200
 do not initiate private connections

00:30:48.200 --> 00:30:50.320
 to the city water system?

00:30:50.320 --> 00:30:53.000
 At all, we would then have to enforce our code.

00:30:53.000 --> 00:30:58.040
 And what that means is we would have to view them

00:30:58.040 --> 00:31:01.080
 as potentially being a substandard structure

00:31:01.080 --> 00:31:04.760
 for lack of running water to the facility.

00:31:04.760 --> 00:31:08.320
 And we are bringing this issue

00:31:08.320 --> 00:31:11.760
 and a couple others back to the council next week

00:31:11.760 --> 00:31:14.360
 to give them clarification on it.

00:31:14.360 --> 00:31:17.120
 So, the final issue to consider was,

00:31:17.120 --> 00:31:19.520
 what happens if less than all 14 property owners

00:31:19.520 --> 00:31:21.040
 initiate private connections?

00:31:21.040 --> 00:31:24.760
 So, we had provided some numbers on December 10th.

00:31:24.760 --> 00:31:26.280
 They were estimates of what the cost would be

00:31:26.280 --> 00:31:27.800
 to connect to the city.

00:31:27.800 --> 00:31:29.760
 In addition to the meter fees,

00:31:29.760 --> 00:31:31.680
 which are standard across the city,

00:31:31.680 --> 00:31:33.520
 the line that they would receive water from

00:31:33.520 --> 00:31:35.720
 does not extend all the way to Green Tree Estates.

00:31:35.720 --> 00:31:38.000
 There's a small gap there.

00:31:38.000 --> 00:31:40.920
 Just like any other property owner or developer,

00:31:40.920 --> 00:31:42.760
 they would have to, once connecting,

00:31:42.760 --> 00:31:45.040
 would have to cover the cost of extending that line

00:31:45.040 --> 00:31:47.240
 from its current location

00:31:47.240 --> 00:31:49.480
 to the Green Tree Estates boundary.

00:31:49.480 --> 00:31:54.320
 And there is a cost to that that all the new connections

00:31:54.320 --> 00:31:56.160
 would be required to share.

00:31:56.160 --> 00:31:59.280
 When we met with council last week,

00:31:59.280 --> 00:32:03.640
 we presented them this table,

00:32:03.640 --> 00:32:07.400
 which showed the cost based on the number of meters

00:32:07.400 --> 00:32:10.120
 that were requested from the residents.

00:32:10.120 --> 00:32:11.680
 At council's request,

00:32:11.680 --> 00:32:14.640
 staff is currently developing several options

00:32:14.640 --> 00:32:17.320
 to bring back to council based on pro rata agreements

00:32:17.320 --> 00:32:19.920
 to see if we can create a scenario

00:32:19.920 --> 00:32:22.880
 where a single or a group of residents

00:32:22.880 --> 00:32:27.000
 would not have to pay all these costs upfront,

00:32:27.000 --> 00:32:28.840
 particularly if other residents would come in

00:32:28.840 --> 00:32:31.400
 afterwards to connect to the city.

00:32:31.400 --> 00:32:34.920
 Council requested that come back to them on February 18th.

00:32:34.920 --> 00:32:40.520
 - Quick question while we're back on the table.

00:32:40.520 --> 00:32:45.480
 Obviously the cost of extending the line is 92.04.

00:32:45.480 --> 00:32:47.200
 - That's the measurement, sir.

00:32:47.200 --> 00:32:48.040
 - Getting back.

00:32:48.040 --> 00:32:53.520
 How much of the tap meter and impact fee

00:32:53.520 --> 00:32:55.120
 is the impact fee per se,

00:32:55.120 --> 00:32:57.240
 and how much of it is the cost of a tap

00:32:57.240 --> 00:32:58.920
 and a meter and installation?

00:32:58.920 --> 00:33:01.400
 - I'm gonna refer to Dr. Banks if I can.

00:33:01.400 --> 00:33:02.240
 - Testament's fine.

00:33:02.240 --> 00:33:10.720
 - I believe that the impact fee on that was around $5,900,

00:33:10.720 --> 00:33:13.840
 but I'd need to go back and check that.

00:33:13.840 --> 00:33:17.040
 - So it's about $1,000 of residents to get 'em hooked up,

00:33:17.040 --> 00:33:20.080
 and the rest is impact on the larger fixed cost structure.

00:33:20.080 --> 00:33:21.440
 - That's correct, but keep in mind,

00:33:21.440 --> 00:33:23.960
 you're also talking about a meter set fee,

00:33:23.960 --> 00:33:27.160
 the meter itself, some valve work.

00:33:27.160 --> 00:33:28.000
 That kind of stuff.

00:33:28.000 --> 00:33:31.280
 So that's all rolled into that at 69.38.

00:33:31.280 --> 00:33:34.000
 - Okay, so you've got 1,000 for the meter setter

00:33:34.000 --> 00:33:38.560
 and meter and that, and you've got 5,900 for the impacts

00:33:38.560 --> 00:33:41.360
 to the larger system and the fixed cost.

00:33:41.360 --> 00:33:42.200
 - That's correct.

00:33:42.200 --> 00:33:49.920
 - And this is just a map of all the residences

00:33:49.920 --> 00:33:52.360
 who we do provide temporary water to.

00:33:52.360 --> 00:33:54.480
 Most of them are in the middle

00:33:54.480 --> 00:33:57.320
 or towards the east side of the property.

00:33:57.320 --> 00:34:00.400
 If we did connect, and can everybody see my mouse right there?

00:34:00.400 --> 00:34:01.240
 Excellent.

00:34:01.240 --> 00:34:05.200
 The meters would be set on the eastern edge,

00:34:05.200 --> 00:34:09.120
 and then service lines would then run, preferably,

00:34:09.120 --> 00:34:11.920
 in the jointly owned roads

00:34:11.920 --> 00:34:13.920
 and make their way to each residence.

00:34:13.920 --> 00:34:16.720
 Although, this is an area where the city only

00:34:16.720 --> 00:34:22.240
 permits and inspects, so we would not make decisions

00:34:22.240 --> 00:34:24.480
 beyond that regarding placement,

00:34:24.480 --> 00:34:29.040
 other than what is required from state law or local law.

00:34:29.040 --> 00:34:31.680
 So we will not take an active part in the planning

00:34:31.680 --> 00:34:32.640
 where those lines goes.

00:34:32.640 --> 00:34:34.720
 We will simply permit and inspect

00:34:34.720 --> 00:34:36.280
 to make sure that they comply.

00:34:36.280 --> 00:34:40.400
 - I have a question about the history of this development.

00:34:40.400 --> 00:34:41.240
 - I'll do my best.

00:34:41.240 --> 00:34:42.320
 - Okay.

00:34:42.320 --> 00:34:47.240
 Green Tree Estates was, before it was an entity as such,

00:34:47.240 --> 00:34:49.560
 was it within the city limits?

00:34:51.560 --> 00:34:53.920
 - It was annexed in 2013.

00:34:53.920 --> 00:34:54.760
 - 2013.

00:34:54.760 --> 00:34:55.600
 - Exactly.

00:34:55.600 --> 00:34:58.320
 But it existed quite a few decades prior to that,

00:34:58.320 --> 00:34:59.760
 just out in the county.

00:34:59.760 --> 00:35:05.640
 - When it was annexed, were the lots,

00:35:05.640 --> 00:35:08.200
 do you know, were the lots divided up?

00:35:08.200 --> 00:35:09.200
 - Yes, they were.

00:35:09.200 --> 00:35:11.200
 They had been subdivided at that point.

00:35:11.200 --> 00:35:14.680
 - Okay.

00:35:14.680 --> 00:35:15.520
 - They had already been subdivided.

00:35:15.520 --> 00:35:18.000
 - They had already been subdivided at that point.

00:35:18.000 --> 00:35:19.640
 - And when it was annexed,

00:35:19.640 --> 00:35:21.720
 the city part of the water supply

00:35:21.720 --> 00:35:26.720
 was still not run up to the boundary of that annexed land,

00:35:26.720 --> 00:35:27.960
 correct?

00:35:27.960 --> 00:35:28.800
 - Correct.

00:35:28.800 --> 00:35:32.680
 So we set out a plan, the service plan for the annexation,

00:35:32.680 --> 00:35:35.520
 prescribed a process by which the owner

00:35:35.520 --> 00:35:38.200
 of the Green Tree Estates water system at the time

00:35:38.200 --> 00:35:39.440
 could connect to the city water

00:35:39.440 --> 00:35:40.760
 and then convey that water

00:35:40.760 --> 00:35:43.480
 to the residents of Green Tree Estates.

00:35:43.480 --> 00:35:47.840
 The cost of that was gonna be borne on that water supplier,

00:35:47.840 --> 00:35:50.280
 the person who owned the well.

00:35:50.280 --> 00:35:54.600
 So the process was laid out, the costs were defined.

00:35:54.600 --> 00:35:57.880
 However, the water supplier did not choose

00:35:57.880 --> 00:35:59.440
 to connect to the city water

00:35:59.440 --> 00:36:02.520
 and opted to continue to provide residents of water

00:36:02.520 --> 00:36:05.200
 from the well that he owned

00:36:05.200 --> 00:36:09.120
 until he decided to cease that provision in November.

00:36:09.120 --> 00:36:13.680
 So we gave them the pathway

00:36:14.920 --> 00:36:19.920
 and then waited for him to act on it.

00:36:19.920 --> 00:36:22.880
 - The lots that are not marked,

00:36:22.880 --> 00:36:25.480
 are those predominantly owned by the same person

00:36:25.480 --> 00:36:29.400
 that owns the water well and perhaps subdivided?

00:36:29.400 --> 00:36:32.520
 - For the most part, for the most part, yes.

00:36:32.520 --> 00:36:34.680
 - And did he or she have to be annexed

00:36:34.680 --> 00:36:37.720
 or did the city take an active step

00:36:37.720 --> 00:36:40.720
 to annex his land into the city?

00:36:40.720 --> 00:36:42.640
 - I'm gonna again defer to Dr. Banks on that one.

00:36:42.640 --> 00:36:46.440
 He is a lot more familiar with those that were in the sign.

00:36:46.440 --> 00:36:48.000
 - I was hoping I'd have another chance

00:36:48.000 --> 00:36:51.480
 because the impact fee is $5,352.

00:36:51.480 --> 00:36:56.640
 So when a property like this is annexed

00:36:56.640 --> 00:36:59.080
 and it exists in the county,

00:36:59.080 --> 00:37:04.000
 the county is required to establish a three-person committee

00:37:04.000 --> 00:37:08.920
 to represent the residents that are in the annexed areas.

00:37:08.920 --> 00:37:10.880
 This particular one was an interesting one

00:37:10.880 --> 00:37:14.240
 because there was a private distribution system

00:37:14.240 --> 00:37:17.280
 in place already that was providing service

00:37:17.280 --> 00:37:19.360
 to all of these lots.

00:37:19.360 --> 00:37:22.120
 And because we could not take over

00:37:22.120 --> 00:37:23.800
 the private distribution system,

00:37:23.800 --> 00:37:26.320
 what was contemplated was an extension of service

00:37:26.320 --> 00:37:31.200
 to actually provide city water

00:37:31.200 --> 00:37:32.920
 to the above ground storage tank

00:37:32.920 --> 00:37:35.720
 that was being used with the well.

00:37:35.720 --> 00:37:37.240
 And then the above ground storage tank

00:37:37.240 --> 00:37:38.360
 would actually distribute it

00:37:38.360 --> 00:37:40.280
 to the rest of the residents.

00:37:40.280 --> 00:37:45.280
 And so in terms of the representation

00:37:45.280 --> 00:37:49.240
 in the annexation that's done by the committee,

00:37:49.240 --> 00:37:53.040
 there is always an opportunity for someone to come in

00:37:53.040 --> 00:37:57.400
 and ask to not be annexed in as a part of that process.

00:37:57.400 --> 00:38:00.080
 That didn't happen in this particular case.

00:38:00.080 --> 00:38:03.200
 - I guess my question was, did the city come say,

00:38:03.200 --> 00:38:07.080
 we're going to take you in and establish that committee,

00:38:07.080 --> 00:38:11.080
 or did the landowners say, come take us into the city?

00:38:11.080 --> 00:38:12.920
 Who initiated the annexation?

00:38:12.920 --> 00:38:17.000
 - The annexation encompassed a much larger area

00:38:17.000 --> 00:38:18.920
 than this particular place,

00:38:18.920 --> 00:38:22.240
 and it was instigated by the city.

00:38:22.240 --> 00:38:24.640
 - Okay, so the city said, we're going to come

00:38:24.640 --> 00:38:26.440
 take you into the city. - That's correct.

00:38:26.440 --> 00:38:28.160
 - As opposed to the landowners saying,

00:38:28.160 --> 00:38:29.480
 please come take us. - That's correct.

00:38:29.480 --> 00:38:30.320
 - Thanks.

00:38:30.320 --> 00:38:32.600
 - Could I ask one question?

00:38:32.600 --> 00:38:33.440
 - Yes, sir.

00:38:33.440 --> 00:38:35.000
 - Are there any other communities

00:38:36.400 --> 00:38:39.320
 where this same situation could happen?

00:38:39.320 --> 00:38:42.160
 - So there are other communities

00:38:42.160 --> 00:38:44.680
 that are served by private wells.

00:38:44.680 --> 00:38:47.760
 Either they're small enough to not be regulated by the state

00:38:47.760 --> 00:38:51.080
 or they're large enough that they do have a state regulation

00:38:51.080 --> 00:38:53.400
 and a public large supply designation.

00:38:53.400 --> 00:38:58.120
 At this point in time, staff is aware of them.

00:38:58.120 --> 00:39:03.120
 We don't think any would immediately replicate this,

00:39:03.120 --> 00:39:06.040
 but it could always happen in the future

00:39:06.040 --> 00:39:07.560
 with anyone or any group

00:39:07.560 --> 00:39:09.000
 that are being served by a private well

00:39:09.000 --> 00:39:14.000
 for that private well supplier to cease that supply,

00:39:14.000 --> 00:39:17.720
 and residents would be required

00:39:17.720 --> 00:39:20.240
 to connect to some other water source,

00:39:20.240 --> 00:39:21.840
 whether it be their own well,

00:39:21.840 --> 00:39:23.040
 if their wells are large enough

00:39:23.040 --> 00:39:24.560
 and they can meet all the requirements,

00:39:24.560 --> 00:39:25.840
 or to connect to the city.

00:39:25.840 --> 00:39:32.040
 - And the owner of this water company really is,

00:39:34.760 --> 00:39:38.760
 does he or she have any responsibilities at all now?

00:39:38.760 --> 00:39:41.000
 Are they off the hook as well?

00:39:41.000 --> 00:39:42.360
 - So what we had determined,

00:39:42.360 --> 00:39:47.360
 and we did a lot of asking and questions,

00:39:47.360 --> 00:39:49.920
 a lot of questions to the state,

00:39:49.920 --> 00:39:53.200
 particularly the TCEQ and PUC, Public Utility Commission,

00:39:53.200 --> 00:39:55.840
 and what they had determined

00:39:55.840 --> 00:40:00.840
 was that it was not large enough to warrant their regulation.

00:40:01.720 --> 00:40:06.000
 So they saw it as just a private relationship

00:40:06.000 --> 00:40:09.400
 between a supplier and a purchaser.

00:40:09.400 --> 00:40:12.880
 The city, however, armed with evidence,

00:40:12.880 --> 00:40:14.880
 presented a case to the contrary

00:40:14.880 --> 00:40:15.960
 that it should have been,

00:40:15.960 --> 00:40:17.120
 and it should have been for a while,

00:40:17.120 --> 00:40:18.880
 regulated by the state.

00:40:18.880 --> 00:40:22.240
 We submitted that to the PUC and the TCEQ.

00:40:22.240 --> 00:40:25.280
 We were told we would receive an official response.

00:40:25.280 --> 00:40:27.240
 Based on that information submitted,

00:40:27.240 --> 00:40:30.560
 to date we have not received a response.

00:40:30.560 --> 00:40:31.800
 - And how long has it been

00:40:31.800 --> 00:40:36.120
 since we've supplied that information approximately?

00:40:36.120 --> 00:40:37.760
 - At least two months.

00:40:37.760 --> 00:40:41.840
 - And what's the determining factor?

00:40:41.840 --> 00:40:44.480
 Number of households, 25?

00:40:44.480 --> 00:40:47.360
 - Number of households and/or number of connections

00:40:47.360 --> 00:40:48.600
 and number of quotients served,

00:40:48.600 --> 00:40:51.120
 depending on which entity you're working with.

00:40:51.120 --> 00:40:52.120
 - Okay, thanks.

00:40:52.120 --> 00:40:55.320
 - Thanks.

00:40:55.320 --> 00:40:56.560
 - You got it.

00:40:56.560 --> 00:40:59.440
 - I have one comment I'd like to make.

00:40:59.440 --> 00:41:01.440
 I had a little time yesterday morning in the group,

00:41:01.440 --> 00:41:03.400
 I saw what it is,

00:41:03.400 --> 00:41:07.280
 and the code violations that are in place in some,

00:41:07.280 --> 00:41:09.320
 but not all, of these properties

00:41:09.320 --> 00:41:11.880
 are at a level that I would call obscene.

00:41:11.880 --> 00:41:16.160
 They are extremely bad.

00:41:16.160 --> 00:41:22.000
 And I would hope that the city

00:41:22.000 --> 00:41:24.240
 and the city manager's office

00:41:24.240 --> 00:41:27.400
 would have, since it's been since November,

00:41:27.400 --> 00:41:31.600
 been aware of those and have coded enforcement actions

00:41:31.600 --> 00:41:32.880
 well underway.

00:41:32.880 --> 00:41:36.000
 It's as extreme as I've ever seen.

00:41:36.000 --> 00:41:38.360
 I've been in a mold on markets, so I,

00:41:38.360 --> 00:41:41.640
 these are really, really awful

00:41:41.640 --> 00:41:44.240
 and it needs some action taken on that.

00:41:44.240 --> 00:41:47.280
 I realize we have public utilities working on that,

00:41:47.280 --> 00:41:49.680
 but it looks to me, my observation is,

00:41:49.680 --> 00:41:52.520
 there are some single family residences

00:41:52.520 --> 00:41:55.080
 that are in need of our help,

00:41:55.080 --> 00:41:56.640
 and then there's some other properties

00:41:56.640 --> 00:41:59.960
 that are completely neglected,

00:41:59.960 --> 00:42:03.800
 causing a real safety problem,

00:42:03.800 --> 00:42:07.160
 and we're right next to concrete elementary,

00:42:07.160 --> 00:42:08.240
 10th of a mile.

00:42:08.240 --> 00:42:13.320
 So it is, in my opinion, a severe problem.

00:42:13.320 --> 00:42:15.240
 - A severe health risk.

00:42:15.240 --> 00:42:16.080
 Health and safety.

00:42:16.080 --> 00:42:23.080
 - This was not shown on any slide in prior to this meeting.

00:42:23.080 --> 00:42:24.520
 Just to summarize the council,

00:42:24.520 --> 00:42:27.120
 the direction we received on the fourth

00:42:27.120 --> 00:42:28.440
 was that we would, again,

00:42:28.440 --> 00:42:30.760
 continue to ask for previous direction from the tent,

00:42:30.760 --> 00:42:33.240
 particularly with the provision of temporary water

00:42:33.240 --> 00:42:34.480
 and working with the residents

00:42:34.480 --> 00:42:36.600
 to just gather as much information we can

00:42:36.600 --> 00:42:39.000
 on the future intentions of each property,

00:42:39.000 --> 00:42:42.560
 whether they want to connect to the system or not.

00:42:42.560 --> 00:42:45.320
 We are going to continue to communicate

00:42:45.320 --> 00:42:46.760
 connection requirements,

00:42:46.760 --> 00:42:49.360
 and pay queues, letters, door-to-door,

00:42:49.360 --> 00:42:51.160
 whatever we need just so that they know

00:42:51.160 --> 00:42:53.000
 what is required of them in detail,

00:42:53.000 --> 00:42:54.960
 and, of course, to make ourselves available

00:42:54.960 --> 00:42:58.520
 as much as we can in dual language,

00:42:58.520 --> 00:42:59.920
 Spanish language and English language,

00:42:59.920 --> 00:43:01.960
 because most of the folks living out there

00:43:01.960 --> 00:43:03.800
 are Spanish speakers.

00:43:03.800 --> 00:43:08.080
 We are scheduling a council discussion

00:43:08.080 --> 00:43:11.080
 on the feasibility of a per-ad agreement

00:43:11.080 --> 00:43:11.960
 and what that might look like.

00:43:11.960 --> 00:43:13.240
 This was requested by the council

00:43:13.240 --> 00:43:17.280
 and is currently scheduled for the 18th of February.

00:43:17.280 --> 00:43:19.120
 And then we're gonna provide additional information

00:43:19.120 --> 00:43:20.320
 to council that they requested

00:43:20.320 --> 00:43:23.280
 regarding inspection requirements.

00:43:23.280 --> 00:43:26.040
 Do those look like what exactly do we have to inspect

00:43:26.040 --> 00:43:27.960
 when someone connects to the water system?

00:43:27.960 --> 00:43:30.920
 And also our code requirements, generally,

00:43:30.920 --> 00:43:32.960
 particularly for those residents

00:43:32.960 --> 00:43:35.080
 who want to do some of the plumbing work themselves.

00:43:35.080 --> 00:43:36.600
 We at least want to have an idea

00:43:36.600 --> 00:43:39.480
 of what would be required if they do hire a licensed plumber

00:43:39.480 --> 00:43:43.080
 to provide a little more detail with the council as well.

00:43:43.080 --> 00:43:45.400
 And then we are scheduled to update council

00:43:45.400 --> 00:43:49.360
 one month prior to the May 22nd expiration.

00:43:49.360 --> 00:43:52.760
 So somewhere on or about April 23rd,

00:43:52.760 --> 00:43:53.800
 we will give them an update

00:43:53.800 --> 00:43:55.440
 on where the residents are at,

00:43:55.440 --> 00:43:58.760
 how many are interested in connecting to the city,

00:43:58.760 --> 00:44:00.880
 and how far along they feel they are

00:44:00.880 --> 00:44:02.680
 to be ready to connect to the city.

00:44:02.680 --> 00:44:05.840
 And with that, I'm happy to answer

00:44:05.840 --> 00:44:08.200
 any of the questions that you may have.

00:44:08.200 --> 00:44:10.000
 - Any others?

00:44:10.000 --> 00:44:11.920
 - Just a comment here.

00:44:11.920 --> 00:44:14.080
 It seems to me that there's a lot of lessons

00:44:14.080 --> 00:44:18.200
 to be learned here from this episode in Denton City.

00:44:19.400 --> 00:44:22.640
 The city initiated the annexation.

00:44:22.640 --> 00:44:24.040
 The residents did not.

00:44:24.040 --> 00:44:30.080
 And in doing so, the city, perhaps unawarely,

00:44:30.080 --> 00:44:34.680
 unknowingly, took on some financial liability

00:44:34.680 --> 00:44:37.760
 that they didn't realize it was going to have.

00:44:37.760 --> 00:44:42.600
 So maybe somebody should take a look

00:44:42.600 --> 00:44:47.600
 at all these other similar areas like they had mentioned,

00:44:48.200 --> 00:44:53.200
 and do some kind of a preliminary cost analysis.

00:44:53.200 --> 00:44:56.720
 If you duplicate this same scenario

00:44:56.720 --> 00:44:59.280
 in these other locations,

00:44:59.280 --> 00:45:03.120
 if they're the ones that were annexed,

00:45:03.120 --> 00:45:06.560
 one of the residents of those spots did not request it,

00:45:06.560 --> 00:45:11.120
 but the city wanted to include them in the city loans.

00:45:11.120 --> 00:45:15.200
 So this is an opportunity to think these things through,

00:45:15.200 --> 00:45:17.240
 I think, in more detail.

00:45:18.960 --> 00:45:21.400
 - And if I can, I think you're absolutely right.

00:45:21.400 --> 00:45:23.400
 This is a unique situation

00:45:23.400 --> 00:45:25.000
 that the city has learned a lot from,

00:45:25.000 --> 00:45:26.400
 but one of the things that we have done

00:45:26.400 --> 00:45:28.880
 is to begin the process of understanding more

00:45:28.880 --> 00:45:32.640
 about what other neighborhoods might present

00:45:32.640 --> 00:45:36.560
 a similar situation, probably not exactly,

00:45:36.560 --> 00:45:38.640
 but a similar situation in the future,

00:45:38.640 --> 00:45:41.800
 or have the possibility of that being an option

00:45:41.800 --> 00:45:44.120
 in the future, and to be prepared for that.

00:45:44.120 --> 00:45:45.400
 So you're absolutely right.

00:45:45.400 --> 00:45:50.400
 And that is starting to look into that as well.

00:45:50.400 --> 00:45:53.280
 - Thank you. - Thank you.

00:45:53.280 --> 00:45:55.240
 - The next item is the consent agenda.

00:45:55.240 --> 00:45:58.240
 We have items A through E.

00:45:58.240 --> 00:46:03.040
 Does any board member wish to pull one of the items?

00:46:03.040 --> 00:46:04.560
 - Got a question on B.

00:46:04.560 --> 00:46:05.840
 - On B, all right.

00:46:05.840 --> 00:46:09.080
 - It's an easy one.

00:46:09.080 --> 00:46:11.200
 - All right, yes.

00:46:11.200 --> 00:46:15.280
 We have a motion to approve A, C, D, and E.

00:46:16.080 --> 00:46:18.360
 - Almost approved.

00:46:18.360 --> 00:46:19.200
 - That's it.

00:46:19.200 --> 00:46:20.600
 - All in favor, say aye.

00:46:20.600 --> 00:46:21.440
 - Aye.

00:46:21.440 --> 00:46:22.880
 - All in favor, say aye. - Aye.

00:46:22.880 --> 00:46:23.720
 - Here it is.

00:46:23.720 --> 00:46:24.560
 Item B.

00:46:24.560 --> 00:46:31.400
 And it's RFP for utilities, scale, size, and work.

00:46:31.400 --> 00:46:32.240
 - Okay.

00:46:32.240 --> 00:46:33.080
 - And it's D.

00:46:33.080 --> 00:46:40.840
 - Good morning, you got a target

00:46:40.840 --> 00:46:42.960
 on duty, assistant general manager, DME.

00:46:42.960 --> 00:46:43.800
 - Yeah.

00:46:43.800 --> 00:46:47.560
 - All right, Terry, this is perhaps a silly question.

00:46:47.560 --> 00:46:52.560
 What in the world is a utility scale for solar energy?

00:46:52.560 --> 00:46:54.200
 - Not a silly question.

00:46:54.200 --> 00:46:58.920
 I think anything over a megawatt

00:46:58.920 --> 00:47:02.960
 is considered a utility scale solar installation.

00:47:02.960 --> 00:47:08.920
 We're seeking to reject this bid because, as you recall,

00:47:11.240 --> 00:47:13.880
 we now are attaining our 100%,

00:47:13.880 --> 00:47:16.760
 we've got under contract, 100% renewal.

00:47:16.760 --> 00:47:19.800
 This was a long-term contract

00:47:19.800 --> 00:47:23.320
 that was done at the end of 2000,

00:47:23.320 --> 00:47:26.720
 RFP that was done at the end of 2018.

00:47:26.720 --> 00:47:31.080
 And I think as we discussed before,

00:47:31.080 --> 00:47:33.240
 we're looking to get some temporal diversity

00:47:33.240 --> 00:47:36.560
 into the portfolio of some shorter-term contracts.

00:47:36.560 --> 00:47:40.920
 We have bids that will be opening here in the next week.

00:47:41.720 --> 00:47:46.000
 That will be alternatives to this particular requisition

00:47:46.000 --> 00:47:48.000
 that will enable us to be able to get both.

00:47:48.000 --> 00:47:52.400
 We can dial in the volumes we want

00:47:52.400 --> 00:47:54.880
 and dial in terms that we want.

00:47:54.880 --> 00:47:55.840
 - Okay.

00:47:55.840 --> 00:48:00.600
 So this is really just requesting an order

00:48:00.600 --> 00:48:03.080
 is to reject the proposal you received.

00:48:03.080 --> 00:48:03.920
 - Correct.

00:48:03.920 --> 00:48:05.200
 - Because they're not favorable.

00:48:05.200 --> 00:48:07.040
 My end up was a scale,

00:48:07.040 --> 00:48:10.000
 I thought you were measuring it the way the staff takes.

00:48:11.200 --> 00:48:14.400
 - And you also weighed solar energy quite a bit.

00:48:14.400 --> 00:48:16.440
 - Okay, I get it.

00:48:16.440 --> 00:48:18.600
 - I have one more question.

00:48:18.600 --> 00:48:25.240
 Would this energy be in the form of REX?

00:48:25.240 --> 00:48:29.560
 - This particular one was specified in the RFP

00:48:29.560 --> 00:48:32.040
 as both energy and REX.

00:48:32.040 --> 00:48:35.800
 So unlike the Whitetail contract,

00:48:35.800 --> 00:48:39.960
 which has a bifurcation of energy and REX,

00:48:39.960 --> 00:48:44.200
 this one was a combined energy and REX.

00:48:44.200 --> 00:48:47.800
 - And the new contracts that you proposed

00:48:47.800 --> 00:48:51.480
 that you're just putting out, what happened?

00:48:51.480 --> 00:48:53.000
 - They would be combined as well.

00:48:53.000 --> 00:48:54.320
 - Okay.

00:48:54.320 --> 00:48:58.120
 A little question just to educate myself.

00:48:58.120 --> 00:49:01.360
 Is there a limited number of REX in the system

00:49:01.360 --> 00:49:06.360
 or does ERCOT say we can only carry this much

00:49:06.360 --> 00:49:07.680
 in the portfolio?

00:49:08.640 --> 00:49:10.240
 - There's no limit.

00:49:10.240 --> 00:49:14.600
 As long as a renewable energy generator

00:49:14.600 --> 00:49:18.080
 is permitted to interconnect with the grid,

00:49:18.080 --> 00:49:20.040
 it is eligible to receive REX.

00:49:20.040 --> 00:49:21.920
 - Thank you.

00:49:21.920 --> 00:49:26.160
 - Do we have a motion to approve IDB?

00:49:26.160 --> 00:49:29.840
 - I second.

00:49:29.840 --> 00:49:31.200
 - All in favor say aye.

00:49:31.200 --> 00:49:32.280
 - Aye.

00:49:32.280 --> 00:49:34.000
 - Opposed, motion carries.

00:49:34.000 --> 00:49:38.040
 Next item is consider approval of the minutes

00:49:38.040 --> 00:49:41.200
 of January 27th, 2020.

00:49:41.200 --> 00:49:42.720
 Does anyone have any changes?

00:49:42.720 --> 00:49:45.560
 - Approved.

00:49:45.560 --> 00:49:46.400
 - Second.

00:49:46.400 --> 00:49:47.240
 - Okay.

00:49:47.240 --> 00:49:48.080
 All in favor say aye.

00:49:48.080 --> 00:49:48.920
 - Aye.

00:49:48.920 --> 00:49:50.880
 - I have a B.

00:49:50.880 --> 00:49:52.600
 - I have a comment.

00:49:52.600 --> 00:49:54.200
 - Sure you can, of course.

00:49:54.200 --> 00:49:58.600
 - I just wanted to congratulate the minute taker

00:49:58.600 --> 00:50:02.080
 on the format for this and that the responses

00:50:02.080 --> 00:50:04.120
 are actually done in bolder faces.

00:50:04.120 --> 00:50:05.960
 A lot easier to read.

00:50:05.960 --> 00:50:06.800
 Thanks.

00:50:08.680 --> 00:50:10.520
 - No, thank you.

00:50:10.520 --> 00:50:13.960
 - Okay, item B is consider the adoption of an ordinance

00:50:13.960 --> 00:50:16.840
 for the construction of the North-South Watermain

00:50:16.840 --> 00:50:17.880
 phase three project.

00:50:17.880 --> 00:50:28.120
 - Good morning, Madam Chair, members of the board.

00:50:28.120 --> 00:50:29.160
 My name is Seth Garcia.

00:50:29.160 --> 00:50:31.880
 I'm a project manager with Capital Projects.

00:50:31.880 --> 00:50:33.680
 Today I'll be doing a short presentation

00:50:33.680 --> 00:50:35.920
 on the award of construction contract

00:50:35.920 --> 00:50:38.440
 for North-South Watermain phase three.

00:50:38.440 --> 00:50:45.640
 A little project overview and a little background.

00:50:45.640 --> 00:50:49.800
 Phase one of this project was completed in 2011.

00:50:49.800 --> 00:50:52.440
 It runs from the northern extent of this project

00:50:52.440 --> 00:50:55.120
 all the way to loop 288.

00:50:55.120 --> 00:50:57.680
 Phase two of this project is currently under construction

00:50:57.680 --> 00:50:59.920
 and runs from Rose Lawn all the way

00:50:59.920 --> 00:51:01.840
 to the southern end of this project.

00:51:01.840 --> 00:51:05.120
 So phase three ultimately will tie the two pieces together

00:51:05.120 --> 00:51:07.560
 and provide a 42-inch transmission lane

00:51:07.560 --> 00:51:10.840
 from north of loop 288 all the way to Rose Lawn,

00:51:10.840 --> 00:51:11.680
 south of town.

00:51:11.680 --> 00:51:16.040
 This particular phase consists of a project

00:51:16.040 --> 00:51:20.800
 that is 4,200 feet of 42-inch poly-coated steel main

00:51:20.800 --> 00:51:23.840
 as well as 900 feet of 12-inch water main

00:51:23.840 --> 00:51:26.200
 that needs to be relocated along Bonnie Break

00:51:26.200 --> 00:51:28.640
 for the installation of this line.

00:51:28.640 --> 00:51:32.680
 The extents for this is completely on Bonnie Break itself

00:51:32.680 --> 00:51:36.200
 from basically the Tex-Dot area office

00:51:36.200 --> 00:51:38.600
 just north of the I-35 service road

00:51:38.600 --> 00:51:40.600
 to just south of the Panhandle.

00:51:40.600 --> 00:51:47.800
 The solicitation was sent to 296 bidders.

00:51:47.800 --> 00:51:50.120
 We received eight bids,

00:51:50.120 --> 00:51:52.840
 the lowest being S&J Construction Company

00:51:52.840 --> 00:51:55.480
 at $4,551.

00:51:55.480 --> 00:52:00.520
 A little breakdown of our schedule.

00:52:00.520 --> 00:52:02.400
 With your approval, we'll go for Councilor Moore

00:52:02.400 --> 00:52:04.280
 next week, February 18th.

00:52:04.280 --> 00:52:07.400
 A notice to proceed will be issued shortly after that

00:52:07.400 --> 00:52:11.280
 and construction will be completed by February 2021.

00:52:11.280 --> 00:52:18.640
 Staff recommends accepting the competitive little bid

00:52:18.640 --> 00:52:21.880
 to S&J Construction for the north-south water main phase three

00:52:21.880 --> 00:52:26.040
 in the amount of $4,551.18.

00:52:26.040 --> 00:52:29.840
 Any questions? - Questions.

00:52:29.840 --> 00:52:32.640
 - Yeah, I have a question. Has this firm done work

00:52:32.640 --> 00:52:34.200
 for Denton before?

00:52:34.200 --> 00:52:37.560
 - This is the first time this firm has done work in Denton.

00:52:37.560 --> 00:52:40.040
 Most recently, as one of their references,

00:52:40.040 --> 00:52:41.960
 they did some work for Wichita Falls

00:52:41.960 --> 00:52:44.720
 with their reuse issue.

00:52:44.720 --> 00:52:47.760
 They laid a lot of the reuse line for that.

00:52:47.760 --> 00:52:49.560
 - Okay, that's the follow-up question.

00:52:49.560 --> 00:52:52.000
 What is the process within your department

00:52:52.000 --> 00:52:55.120
 for evaluating new contractors like this?

00:52:55.120 --> 00:52:58.240
 - So with this one, we actually took some precautions

00:52:58.240 --> 00:53:00.720
 just because of the type of pipe that it is.

00:53:00.720 --> 00:53:02.240
 It's not a very common pipe.

00:53:02.240 --> 00:53:04.400
 It's 42-inch poly-coated steel.

00:53:04.400 --> 00:53:06.960
 There's only generally a handful of contractors

00:53:06.960 --> 00:53:08.800
 that are doing this around.

00:53:08.800 --> 00:53:12.840
 So our engineering firm actually reached out

00:53:12.840 --> 00:53:15.440
 to the three references listed.

00:53:15.440 --> 00:53:17.800
 All three gave favorable references.

00:53:17.800 --> 00:53:22.520
 Through purchasing, we got some clarification on a few things

00:53:22.520 --> 00:53:26.520
 and our engineer felt comfortable recommending them

00:53:26.520 --> 00:53:29.040
 for the construction contract.

00:53:29.040 --> 00:53:33.520
 - Move to approve.

00:53:33.520 --> 00:53:34.360
 - All right.

00:53:34.360 --> 00:53:35.200
 - Second.

00:53:35.200 --> 00:53:36.360
 - All in favor say aye.

00:53:36.360 --> 00:53:37.200
 - Aye.

00:53:37.200 --> 00:53:38.520
 - Motion carries.

00:53:38.520 --> 00:53:39.360
 - Thank you.

00:53:39.360 --> 00:53:42.720
 - Next item is consider recommending adoption

00:53:42.720 --> 00:53:46.920
 of a new ordinance for the city of Denton

00:53:46.920 --> 00:53:50.240
 to execute a contract with quality excavation LLC

00:53:50.240 --> 00:53:53.840
 for the 2019 street reconstruction projects.

00:53:56.520 --> 00:53:59.360
 (papers rustling)

00:53:59.360 --> 00:54:06.440
 - Justin, you put a normal thing over here?

00:54:06.440 --> 00:54:07.280
 - Mm-hmm.

00:54:07.280 --> 00:54:11.000
 - Justin, you put a normal thing over here?

00:54:11.000 --> 00:54:16.320
 I'm sorry, I'm out of time.

00:54:16.320 --> 00:54:19.160
 (papers rustling)

00:54:19.160 --> 00:54:23.280
 (coughing)

00:54:26.840 --> 00:54:27.680
 - Go.

00:54:27.680 --> 00:54:36.520
 - All right, good morning.

00:54:36.520 --> 00:54:37.480
 My name is Trevor Cranny.

00:54:37.480 --> 00:54:40.520
 I'm a project manager in the capital projects.

00:54:40.520 --> 00:54:42.920
 Today, we're gonna be talking about

00:54:42.920 --> 00:54:45.600
 the 2019 street reconstruction project.

00:54:45.600 --> 00:54:50.520
 We're looking to award contract to quality excavation.

00:54:55.160 --> 00:54:57.400
 So a small overview of this project.

00:54:57.400 --> 00:55:00.040
 As you can see, it's kinda spread out throughout the city.

00:55:00.040 --> 00:55:03.880
 What we did was pick those four main areas

00:55:03.880 --> 00:55:07.920
 that consist of roadway water and wastewater improvements

00:55:07.920 --> 00:55:09.560
 on a section of Hercules Lane,

00:55:09.560 --> 00:55:12.560
 Scripture Street, Thomas Street, and Mary Drive.

00:55:12.560 --> 00:55:18.560
 The breakdown on that is we have on Scripture,

00:55:18.560 --> 00:55:21.040
 we're doing street and some sewer work.

00:55:21.040 --> 00:55:24.200
 On Windsor, we're doing street and water and sewer.

00:55:24.200 --> 00:55:26.160
 On the other two streets, Hercules and Thomas,

00:55:26.160 --> 00:55:28.440
 we're just doing some street reconstruction.

00:55:28.440 --> 00:55:35.360
 So we got four bids on this one.

00:55:35.360 --> 00:55:38.560
 As you can see, quality excavation was a low bid

00:55:38.560 --> 00:55:39.880
 by almost $2 million.

00:55:39.880 --> 00:55:42.880
 We did go through their bid

00:55:42.880 --> 00:55:45.040
 'cause it was a pretty big difference.

00:55:45.040 --> 00:55:47.520
 A lot of that difference is due to mobilization.

00:55:47.520 --> 00:55:52.480
 Quality excavation does have a site here pretty close,

00:55:52.480 --> 00:55:57.480
 so that kinda made a difference of where they made their low bid.

00:55:57.480 --> 00:56:02.920
 Construction schedule, this is actually,

00:56:02.920 --> 00:56:05.840
 we were shooting a little far in the future,

00:56:05.840 --> 00:56:07.600
 but we're looking at a council next week

00:56:07.600 --> 00:56:09.440
 if we get approved here.

00:56:09.440 --> 00:56:11.520
 So this will actually move up a little bit.

00:56:11.520 --> 00:56:13.320
 But it's a two-year contract.

00:56:13.320 --> 00:56:15.520
 There are some schools located in these areas,

00:56:15.520 --> 00:56:17.520
 so we wanna make sure we give them time

00:56:17.520 --> 00:56:20.640
 to work on those schools during summer,

00:56:20.640 --> 00:56:22.760
 when that is dictated in the contract.

00:56:22.760 --> 00:56:28.960
 So we're recommending an adoption of an ordinance

00:56:28.960 --> 00:56:30.680
 to accept a competitive low bid

00:56:30.680 --> 00:56:32.560
 and awarding a public works contract

00:56:32.560 --> 00:56:36.640
 for the construction of the 2019 Street Reconstruction Project,

00:56:36.640 --> 00:56:39.080
 quality excavation, and not to exceed the amount

00:56:39.080 --> 00:56:43.160
 of $10 million, $202,355.45.

00:56:43.160 --> 00:56:48.200
 - Questions?

00:56:48.200 --> 00:56:52.560
 DSF, what is your quality control process

00:56:52.560 --> 00:56:54.480
 for a project like this?

00:56:54.480 --> 00:56:57.200
 - Quality control, like as far as the construction itself?

00:56:57.200 --> 00:56:58.120
 - Correct.

00:56:58.120 --> 00:57:01.560
 - So in these contracts, we require the contractor

00:57:01.560 --> 00:57:05.920
 to provide testing, to get a testing lab on one site,

00:57:05.920 --> 00:57:08.600
 to test their materials.

00:57:08.600 --> 00:57:11.680
 They have to do material testing,

00:57:11.680 --> 00:57:13.960
 compaction testing, all those type of things.

00:57:13.960 --> 00:57:17.000
 We also get a PO with the testing lab

00:57:17.000 --> 00:57:21.160
 as far as the state's concern to spot check their testing.

00:57:21.160 --> 00:57:24.440
 - So the contractor releases himself

00:57:24.440 --> 00:57:26.880
 on whether he is attaining the right compaction.

00:57:26.880 --> 00:57:28.720
 - That's correct.

00:57:28.720 --> 00:57:29.560
 - I can answer that.

00:57:29.560 --> 00:57:30.840
 My name is Dustin Roper.

00:57:30.840 --> 00:57:34.240
 The program I get probably is,

00:57:34.240 --> 00:57:36.040
 as we said, it's probably south in the states

00:57:36.040 --> 00:57:37.920
 on this job, four hours to a minimum,

00:57:37.920 --> 00:57:39.880
 four day out every day.

00:57:39.880 --> 00:57:41.960
 Every time the last sample test,

00:57:41.960 --> 00:57:44.400
 we'll even know that the contractor does provide

00:57:44.400 --> 00:57:48.600
 the testing, the representative will sit in his letter.

00:57:48.600 --> 00:57:51.800
 Every time the test, we'll give it up.

00:57:51.800 --> 00:57:55.880
 Sorry, I don't know what this is, I'm cracking it up.

00:57:55.880 --> 00:57:57.440
 In the other minute, for the worst of it,

00:57:57.440 --> 00:57:59.120
 I'll be there, I'll probably be the manager

00:57:59.120 --> 00:58:03.440
 or myself, go out and basically watch something like this.

00:58:03.440 --> 00:58:06.600
 - One thing is specifically in the soil compaction,

00:58:06.600 --> 00:58:08.240
 prior to placing the pavement.

00:58:08.240 --> 00:58:11.520
 If a pavement breaks and fails,

00:58:11.520 --> 00:58:13.280
 the year after, we put it down.

00:58:13.280 --> 00:58:17.280
 Often times, that's because the soil wasn't prepared for that.

00:58:17.280 --> 00:58:21.400
 And the nuclear density meter can be used to check

00:58:21.400 --> 00:58:25.120
 compaction and you know the results now.

00:58:25.120 --> 00:58:25.960
 Is that what you do?

00:58:25.960 --> 00:58:26.800
 - Yes, sir.

00:58:26.800 --> 00:58:27.640
 - That's correct.

00:58:27.640 --> 00:58:29.120
 - It's also the water moisture content problem,

00:58:29.120 --> 00:58:30.640
 what you're gonna do.

00:58:30.640 --> 00:58:33.720
 It's also required to set a period of four or five days

00:58:33.720 --> 00:58:37.000
 before we pay to make sure that there is no,

00:58:37.000 --> 00:58:38.800
 when they're cracking, and so forth.

00:58:38.800 --> 00:58:41.440
 Yes, sir, and now?

00:58:41.440 --> 00:58:43.120
 - So that is a good point.

00:58:43.120 --> 00:58:44.400
 As every building is celebrating,

00:58:44.400 --> 00:58:47.280
 we also put in a small list of what we test each week,

00:58:47.280 --> 00:58:50.520
 so we don't have as many cracking that we have to hold.

00:58:50.520 --> 00:58:55.520
 - Right, our respects do dictate the width

00:58:55.520 --> 00:58:57.840
 that they have to compact in,

00:58:57.840 --> 00:59:00.400
 what the materials have to be underneath the pipe,

00:59:00.400 --> 00:59:04.040
 as far as the top of the pipe is concerned.

00:59:04.040 --> 00:59:07.760
 - Any other questions?

00:59:07.760 --> 00:59:10.080
 I was gonna ask a question about almost two million

00:59:10.080 --> 00:59:12.320
 that you beat me to it, so.

00:59:12.320 --> 00:59:13.240
 You knew that didn't you?

00:59:13.240 --> 00:59:15.960
 - Yeah, they did have a couple other items,

00:59:15.960 --> 00:59:19.240
 mainly on the water and wastewater that were a little lower,

00:59:19.240 --> 00:59:22.360
 but the majority of the bulldozer they should cost that,

00:59:22.360 --> 00:59:24.280
 whether it kind of be everybody else.

00:59:24.280 --> 00:59:27.520
 - I have a motion to approve.

00:59:27.520 --> 00:59:30.160
 - I move to approve.

00:59:30.160 --> 00:59:31.360
 - I'll second.

00:59:31.360 --> 00:59:32.840
 - All in favor say aye.

00:59:32.840 --> 00:59:33.920
 - Aye.

00:59:33.920 --> 00:59:35.280
 - Motion carries.

00:59:35.280 --> 00:59:37.120
 Assistant manager R.P.

00:59:37.120 --> 00:59:37.960
 Yes, sir.

00:59:37.960 --> 00:59:41.440
 - Board members, we have a few items

00:59:41.440 --> 00:59:44.240
 that are included in the ACM updates.

00:59:44.240 --> 00:59:49.160
 The first one is the solid waste management study,

00:59:49.160 --> 00:59:53.640
 and that is just an item for your information.

00:59:53.640 --> 00:59:55.760
 This item is out on the street right now,

00:59:55.760 --> 00:59:57.720
 it will be coming back to you

00:59:57.720 --> 01:00:00.360
 once the evaluations have been done.

01:00:00.360 --> 01:00:02.200
 Let's have one to provide that information

01:00:02.200 --> 01:00:03.920
 to you ahead of time so you can come see

01:00:03.920 --> 01:00:05.760
 what elements exist.

01:00:05.760 --> 01:00:07.720
 Brian Burner is here if you have any questions

01:00:07.720 --> 01:00:09.080
 about that particular item.

01:00:12.440 --> 01:00:16.760
 - Okay, the next item is a development agreement

01:00:16.760 --> 01:00:19.600
 for a development called Sagebrook,

01:00:19.600 --> 01:00:23.200
 and what it will be is basically,

01:00:23.200 --> 01:00:26.360
 oh, I'm so sorry, I almost did it.

01:00:26.360 --> 01:00:31.360
 What it will be is essentially a development agreement

01:00:31.360 --> 01:00:36.680
 for an area that's being voluntarily annexed into the city.

01:00:36.680 --> 01:00:41.400
 The development agreement will be put in place

01:00:41.400 --> 01:00:46.120
 we expect due to the location's preliminary conversations

01:00:46.120 --> 01:00:47.760
 that we've been having with the developer

01:00:47.760 --> 01:00:50.200
 that there will be an oversized participation agreement

01:00:50.200 --> 01:00:52.840
 for wastewater services coming off of that,

01:00:52.840 --> 01:00:55.680
 and so if that happens, and it likely will,

01:00:55.680 --> 01:00:57.560
 you'll be seeing that item coming forward.

01:00:57.560 --> 01:00:59.440
 We just wanted to give you a little context

01:00:59.440 --> 01:01:04.440
 on what Sagebrook was and why this was coming forward

01:01:04.440 --> 01:01:06.280
 with this development agreement.

01:01:10.120 --> 01:01:15.120
 The future PUD items, we have just a couple on there.

01:01:15.120 --> 01:01:21.320
 So the wastewater rate study you've received today,

01:01:21.320 --> 01:01:24.480
 it's my understanding that the energy center dashboard

01:01:24.480 --> 01:01:26.440
 had to be moved, there were a few more elements

01:01:26.440 --> 01:01:29.280
 to be completed on it, and it is anticipated

01:01:29.280 --> 01:01:32.040
 to be at the PUD meeting on the 24th.

01:01:32.040 --> 01:01:37.000
 And then moving on to new business action items,

01:01:37.000 --> 01:01:42.000
 so we head to the tour of the recycling center for crack,

01:01:42.000 --> 01:01:44.360
 and it's my understanding that it's scheduled

01:01:44.360 --> 01:01:46.440
 for this Wednesday the 12th.

01:01:46.440 --> 01:01:50.200
 So I wish everybody a good tour on that,

01:01:50.200 --> 01:01:54.080
 it's always an exciting thing to see.

01:01:54.080 --> 01:01:58.200
 And then we're member of effort had asked about

01:01:58.200 --> 01:02:02.440
 the process for equipment replacement

01:02:02.440 --> 01:02:05.760
 that is scheduled for the next meeting on the 24th,

01:02:05.760 --> 01:02:09.560
 and we can figure it all out, and that's all I have.

01:02:09.560 --> 01:02:10.960
 - Thank you.

01:02:10.960 --> 01:02:13.040
 All right, concluding items.

01:02:13.040 --> 01:02:15.080
 Does the board now wish to have anything added

01:02:15.080 --> 01:02:18.560
 to the future agenda or any comments?

01:02:18.560 --> 01:02:23.680
 Do I have a motion to adjourn?

01:02:23.680 --> 01:02:27.680
 All right, I'll adjourn.