Jun 08, 2026 Public Utilities Board on 2026-06-08 9:00 AM

June 08, 2026 Public Utilities Board 390252

Meeting Details
Meeting Date: June 08, 2026
Board: Public Utilities Board
Video ID: 390252
Has Transcript: Yes
Has Agenda: Yes
AI Summary by Dentron 3000

Meeting Summary: Public Utilities Board Date: June 8, 2026 Location: City Hall, Council Work Session Room, Denton, Texas

Key Topics and Discussions - Consent Agenda Items A–E: Reviewed without discussion. Items included a contract extension with FX5 Utility Construction LLC, a utilities cost participation agreement with Meritage Homes of Texas, LLC, Change Order No. 5 with Sundt Construction, Inc., rejection of proposals under RFP 8989 for John Deere equipment, and a SCADA system maintenance contract with Open Systems International, Inc. - Consent Agenda Item F (636 Denton Dev Company, LLC Facilities Agreement): Pulled for discussion. Staff addressed the temporary wastewater treatment plant’s operational timeline (approximately 1–1.5 years until the Clear Creek Interceptor completes late 2028/early 2029), infrastructure sizing (water lines sized to the master plan; wastewater lines sized for the development only), confirmation that the agreement does not delay the Clear Creek Interceptor, and options for relocating or disposing of the temporary plant upon decommissioning. - May 18, 2026 Minutes: Reviewed for approval. No corrections or comments were submitted. - Clear Creek Water Reclamation Plant (Carollo Engineers, Inc.): Staff presented the design contract. Discussions covered the 10 MGD capacity (expandable, ~10-year life expectancy before expansion), site location near Harley Field and Collins Road, mitigation of impacts to adjacent mountain bike trails, funding sources (traditional debt, WIFIA, Texas Water Development Board), and project timelines (design through Q4 2028, construction 2028–2032). - Peterbilt Truck Services (Rush Truck Centers of Texas, L.P.): Staff presented the cooperative purchasing contract. Discussions covered the city’s fleet size (~115 Peterbilt trucks), the value of manufacturer-specialized diagnostics, and confirmation that this is a renewal of an existing agreement. - Management Reports: Staff provided updates on the North Masch Branch Sewer, upcoming budget preparation, quarterly water department reporting, and a recap of the city’s renewable energy goals.

Motions, Votes, and Outcomes - Consent Agenda Items A–E: Motion carried unanimously. - Consent Agenda Item F: Motion carried unanimously. - Approval of May 18, 2026 Minutes: Motion carried unanimously. - Carollo Engineers, Inc. Professional Services Agreement: Motion carried unanimously. - Rush Truck Centers of Texas, L.P. Contract: Motion carried unanimously. - Management Reports: No action required.

Decisions Made - Authorized contract extension with FX5 Utility Construction LLC for underground electric installation through November 18, 2027. - Authorized Amended and Restated Water and Wastewater Utilities Oversize Cost Participation Agreement with Meritage Homes of Texas, LLC (not-to-exceed $8,988,869.36). - Authorized Change Order No. 5 with Sundt Construction, Inc. for the Bonnie Brae Phase 3 project (not-to-exceed $1,048,785.81; total contract $43,755,993.44). - Authorized rejection of all competitive proposals under RFP 8989 for heavy-duty John Deere equipment maintenance, repair, and rental. - Authorized contract with Open Systems International, Inc. for SCADA system maintenance and support (3-year not-to-exceed $791,693.00). - Authorized facilities agreement with 636 Denton Dev Company, LLC for the Sundance Development, including construction of temporary water/wastewater facilities, withdrawal of protest for TCEQ Permit No. WQ0016632001, and permit transfer to the City. - Authorized professional services agreement with Carollo Engineers, Inc. for Clear Creek Water Reclamation Plant design (not-to-exceed $45,528,839.00). - Authorized contract with Rush Truck Centers of Texas, L.P. for Peterbilt truck acquisition, repair, and maintenance (1-year term with four 1-year extensions; 5-year not-to-exceed $14,679,000.00). - Approved the May 18, 2026 meeting minutes.

Action Items or Next Steps - City Manager or designee to execute all approved contracts and ordinances. - City staff to prepare and present budget materials to the Board in upcoming meetings. - Water Utilities Department to deliver the next quarterly report on July 13, 2026. - Capital Projects and Water Utilities departments to continue coordination on the Clear Creek Interceptor and Clear Creek Water Reclamation Plant projects per established design and construction timelines. - 636 Denton Dev Company, LLC to proceed with planning, design, and construction of temporary wastewater and water facilities for the Sundance Development per the approved agreement.

Agenda Chapters
1. 2. CONSENT AGENDA
0:15 - 0:55
2. F. PUB26-089 Consider recommendation of an ordinance of the City of Denton, Texas, a home-rule municipal corporation, authorizing the City Manager, or their designee, to execute a facilities agreement with 636 Denton Dev Company, LLC, wherein the Developer will plan, design, and construct a temporary wastewater treatment plant, city water line, and other water and wastewater facilities necessary to serve the Sundance Development generally located west of the intersection of Farm-to-Market Road 2164 and Milam Road East; requiring the City’s withdrawal of its protest of Texas Pollutant Discharge Elimination System Permit No. WQ0016632001; providing for the City’s ownership and operation of water and wastewater facilities, including the wastewater treatment plant; requiring transfer of Texas Pollutant Discharge Elimination System Permit No. WQ0016632001, when issued, from the Developer to the City; providing a capacity reservation to the Developer; and providing an effective date.
0:55 - 6:54
3. A. PUB26-092 Consider approval of the May 18, 2026 minutes.
6:54 - 7:14
4. B. PUB26-065 Consider recommending adoption of an ordinance of the City of Denton, a Texas home-rule municipal corporation, authorizing the City Manager to execute a Professional Services Agreement with Carollo Engineers, Inc., for engineering services for Clear Creek Water Reclamation Plant for the Water Utilities Department as set forth in the contract; providing for the expenditure of funds therefor; and providing an effective date (RFQ 8213-019 - Professional Services Agreement for engineering services awarded to Carollo Engineers, Inc., in the not-to-exceed amount of $45,528,839.00).
7:14 - 19:35
5. C. PUB26-078 Consider recommending adoption of an ordinance of the City of Denton, a Texas home-rule municipal corporation, authorizing the City Manager to execute a contract with Rush Truck Centers of Texas, L.P., through the Buy Board Cooperative Purchasing Network Contract No. 723-23, for the acquisition, repairs, and maintenance of Peterbilt Trucks for the Fleet Services Department; providing for the expenditure of funds therefor; and providing an effective date (File 9009 - awarded to Rush Truck Centers of Texas, L.P., for one (1) year, with the option for four (4) additional one (1) year extensions, in the total five (5) year not-to-exceed amount of $14,679,000.00).
19:35 - 23:19
6. D. PUB26-094 Management Reports 1. North Masch Branch Sewer 2. Future Agenda Items 3. New Business Action Items
23:19 - 24:39
Transcript
3695 words
- Good morning and welcome to the regularly scheduled public utilities board meeting for the city of Denton. Today is Monday, June 8th and it is 9 a.m. Our meeting is called to order. Do we have any public comments? Moving on to our next item on the agenda, consent agenda. Would any member like to pull an item for discussion? I have a few questions on item F. So I'd like to receive a presentation on that after we work through the rest of the consent agenda. - On the approval of A through E. - We have a motion for approval of the consent agenda. - Second. - Items A through E and a second. All in favor say aye. - Aye. - Any opposed? Motion carries unanimously. And now item F. (murmuring) - Good morning board. My name is Charlie Rosenthal. I'm the director of development services for the city of Denton. I don't have a presentation, but I do have some answers to some of the questions you ask. And so I just go through the list of questions here and then if anybody else has any questions, I'd be happy to answer those too. So the first one was really related to how temporary this temporary wastewater treatment facility would be. And so we're expecting the Clear Creek interceptor to be ready by the end of 2028 or early 2029. And so this developer would start the process of development after city council considers and approves the development agreement on the 16th. And so it's really dependent on how quickly they move following council approval. But at most, it's a two year timeline between now and then and with their development timeline, the plant would be online for roughly a year, a year and a half. And then the next question was if the water and wastewater was sized for future development and particularly around Craver Ranch. So this development is building a water line that's sized to our master plan. They would have to build a wastewater line and it's in a different basin than what the Clear Creek development would be. And so they would be building a wastewater line that's sized for their development. We don't have anything in the master plan in the near term for that area as far as where that wastewater line would go . And so water, yes, it would be built to serve that region in accordance with the master plan, but wastewater, it would just be for their development. - And is that just because of, so the wastewater master plan includes all of the various future developments. Like I know Craver Ranch is up there, there used to be a development in process called Hills of Denton North and there are a few others. So that the master plan already includes all of that kind of expected development in that area. - Correct, and the Clear Creek Interceptor runs through the Hills of Denton property. This one's a little further north off of Milam Road and there's not been a ton of development interest out that way. And then Craver Ranch is actually further east of this development. And we've been discussing with them extensions of their wastewater infrastructure in accordance with the agreement the city had for them, but it's not really in line with where this development's occurring. - Okay, so this, but this, their contributions in construction there will be appropriate for the master plan, maybe not affected by Craver Ranch. - Yeah, at least the water portion would be, wastewater would be sized for their development. I think the next question was if this delays anything with the Clear Creek Interceptor, it does not. So the way the development agreement for this would work is they would be allowed to construct a temporary plant that the city would own and operate that would come off of line when the Clear Creek Interceptors completed. And so that project's still moving forward and doesn't affect the timeline of that project at all. - Are there any other questions from the board? I have one follow-up question. The temporary water treatment plant or water reclamation facility, if it'll be any use for two years and it'll become city of Denton property, at that point, is it like a package plant that we could then sell or would it stay just parked non-operational at the site? What's the plan for disposal of this capital? - So really it would be up to our water team's decision at that point, so the way the agreement is written is it's at their cost to remove it and the city has the option either for them to remove it and dispose of it in accordance with state law or they can remove it and move it to a location of the city's choosing. So I think if we have a need for another temporary plan in another location, then we could ask them to move it to that location if there's a future city use for it or for sale or anything like that. But that's something we would consider at the time that the plan's removed, but it's at our option. - Okay, thank you, Chairman. Excuse me, good morning. Have we done such a situation like that occur? Have we done that before? - Not that I-- - So this is a first? - That's correct, yeah. - Who said that? Over the back row? (laughing) - Tony getting upset and me answering something from the gallery, Stephen Gay, General Manager of Water Utilities. We not exactly like this, but if you think back to the Robeson community, it's very similar to that, right? Where they built a plant to help their development and the city took over operation of it. And now we're leveraging that plant and part of our larger system and converting it into a lift station. So we'd have the similar option there as well. - Great, I appreciate it. I thought there was something else, but I wasn't sure. Thanks for being here. - Thank you, Mr. Chairman. - Any further questions? Okay. With that, I'll move approval of item F from our consent agenda. - Aye. - We have a motion and a second. All in favor, say aye. - Aye. - Any opposed? Motion carries unanimously. Now we will move on to our items for individual consideration. Our first item is approval of the May 18th minutes. Are there any corrections or comments? We have a motion. - Second. - And a second. All in favor, say aye. - Aye. - Motion carries unanimously. Our next item for individual consideration is item B. Consider recommending adoption of an ordinance authorizing the city manager to execute a professional services agreement with Corolla Engineers for the Clear Creek Water Reclamation Plant for a total not to exceed of $45,528,839. - Good morning, I'm David Brown, Water Utilities Project Manager. Today I'm here to request the approval of the design contract for the Clear Creek Water Reclamation Plant. This facility will help water utilities regionalize services in the Clear Creek Drainage Basin. The Clear Creek Drainage Basin is located just north of the Loop 288 area. You can see by this map we have together here is the Clear Creek Sewer Interceptor and the Clear Creek Water Reclamation Plant. They're noticed by the star. The Clear Creek Drainage Basin Plant, like I said, was located just north of Loop 288 and compared with previous studies, we have seen accelerated development in this area compared to other areas around the city. Currently, wastewater is collected from the Clear Creek Drainage Basin and flows down in pumps into Pecan Creek Water Reclamation Plant. The Clear Creek Water Reclamation Plant, where it's treated there, treating the wastewater at that plant does have some capacity constraints. So with the development and construction of a wastewater treatment plant there at Clear Creek will help alleviate some of the constraints there at Pecan Creek. To prevent degradation of the surface water areas in that area, Denton is using a regionalization, sorry, a regionalization strategy to limit the number of small package plants, just like we talked about, in that area that is often used by developers. We'll want them to tie into our Clear Creek Interceptor and be able to treat the water there. Two critical projects, like I spoke about, are the Clear Creek Interceptor Sewer Interceptor, which is at about 60%, Charlie talked about it's on the way , it's at about 60% design, working through alignment and easements, and also today we're talking about the Clear Creek Water Reclamation Plant. The Clear Creek Water Reclamation Plant is located, will be located on city owned property near the intersection of Harley Field and Collins Road, as shown in the picture here. For clarity, I want to go ahead and show, like we put on here in gold, the Clear Creek Interceptor, which is in design, and it'll collect all the wastewater throughout the drainage basin and convey it down to the Water Reclamation Plant. Let's talk about the site. The site is permitted for a Water Reclamation Plant and a lift station, and it currently has a permit of 10 million gallons per day . If we want to look through this, here's just a rendering from 2002 when we first started to design it, and let's look at the timeline. In 1998, a wastewater treatment planning report came through, and then in 2000 we purchased the property, the city did. In 2002, we had a PDR and a preliminary design report, and we're granted a .95 MGD, a partial discharge permit there. In 2003, with a downturn of development in that area, we paused because of that downturn in 2003. In 2025, we were granted a full 10 MGD TCQ discharge permit . Oh, I might have skipped one here, I don't know, maybe not. So this will, let me talk about, this will be an Advanced Water Reclamation Plant, MBR plant . With that, high efficiency screening, grit removal, a biological nutrient removal, also called BNR, we'll refer to that as BNR, membrane bioreactor, MBR, odor control system, ultraviolet disinfection, and also architectural components on operations building. Estimated construction cost now is $455 million, and you can see our timelines. Design services starting as soon as possible and ending in quarter four of 2028. Construction services start in quarter four of 2028 and run through 2032. Given the location of the proposed plant site, we wanna minimize the impact on the mountain bike trails in that area, and it's a top priority of the utility. The plant, as you can see in yellow, will utilize the lower portion of the property so we could be able to use the rest of property for other designated things that may go on. Impacted trails will be rerouted, and we are exploring adding additional educational items along the fence so those visitors who come out there could get an education on wastewater treatment in the municipal, at the municipal level. (mouse clicking) Six firms were evaluated through our pre-qualified list, 8312, and we have selected Corolla Engineering. Corolla was selected due to the multifunctionality and efficiency of the proposed site plan. They took into consideration the mountain bike trails and put a site plan that we liked, and just the process that they conveyed in order to minimize the impact at the current site. As you can see here, design contract proposal is $45,528,839, and that is roughly at about 10% of estimated construction costs that we're seeing designed with construction costs, and we are gonna utilize the construction manager at risk to see more coordination, four-year base contract, and two-year special services. Funding breakdown, traditional debt, up to 51% will utilize, and we are also applied for the WIFIA, Water Infrastructure Finance Innovation Act, that we currently applied for, and that could fund up to 49% of the debt there. And also we applied for Texas Water Development Board Clean Water State Revolving Fund. There you can see it's in progress up to $400 million, low-interest loans, with a possibility of up to $60 million per year. With that, staff recommends the adoption of a professional service contract between the City of Denton and Corolla Engineers for design and construction-faith services for the Clear Creek Water Reclamation Plant, not to exceed the amount of $45,528,839. And I will stand for any questions. - Could you go to slide four, please? - Yes, sir. - Thank you. That's it. What is the projected capacity for that 10 million gallon daily? Obviously we're not at that stage now. What's the life expectancy of that, do you think? - I think the life expectancy would be 10 years, I think. That's what we're estimating. - And then what happens after that? - We expand it. And we are, actually the design will be expandable. It's not just capped at that 10 MGD. - That's what I was curious about. - We're gonna design it for expansion. - Thank you. And then slide five, please. I was curious on the estimated, the 455 million, is this 45 million part of that 455 million? - No, sir. - No, that's separate. - Yes, sir. - Okay. Thank you very much. - Thank you. - I took my questions. (laughing) - I went over there earlier and read our notes. (laughing) - So I just wanted to, going back to consent agenda item F, that interceptor, that's already a separate project that's already kind of in process. - Yes, sir. Capital projects is delivering that one. So we're coordinating with them. - And that basically leads to this. Like it connects to this plan. - Yes, sir. - Okay. And I do wanna comment, could you go back to the timeline? I think maybe it was slide four. - Go backwards here, I'm sorry. - No problem. Well, yeah, that one and also the mountain bike path. I just wanted to point out, this has been planned for almost 30 years. Yeah, like, you know. And I think it was a really, the purchase property in 2000 and it's been able to be used for the mountain bike trails and other uses. And I think the utility department was really receptive to that idea and really helped allow, you know, it was really magnanimous perhaps to allow that secondary use on this property. I know there's people that were really concerned that that whole mountain bike trail system was gonna be destroyed and they're gonna kind of kicked off the property. But the property was purchased with this, you know, use in mind. And so I think it's really great that we've been able to, that hopefully Corolla will be able to work through and y'all will be able to work through allowing as much of that mountain bike use to stay there while still achieving the primary objective of this property. I just wanted to put that out. - I wanted to share that one of the things that Corolla brought was the idea for the mountain bike trails and how important they knew that was gonna be important. And they have some people on board that are, I guess they're called mountain bikers. So they know the people that like that type stuff and we wanna be cognizant of their concerns and we're gonna do our best. - And I have one final question, just I think the very first slide with the map or maybe the second slide with the map. - I gotta learn how to go back. Sorry. Yes, I'm gonna learn that today. - I'm assuming that outlined area in the North Denton area, that is what this will serve? - Yes, sir. - And is that the end of, on the East side, is that the end of Denton or is there actually more of Denton on the East side of Elm Fork, I guess that is? - There's more of Denton on that side, but as far as service area, I don't know exactly where it stops. - Okay. - So this is basically, I don't say a new basin, but it's gonna be a new basin that we collect from and actually go to a plant. We've been collecting some from that basin. If you go up 428 Sherman Drive and some of those developments up there, those are actually in the Clear Creek basin, but we've been serving them through the Pecan Creek and pumping them to the Pecan Interceptor and sending it south to our Pecan Creek. So we'll be able to utilize the Clear Creek Interceptor, not just for those north of the Interceptor, but also just a little bit south there along Agave Ranch and those types. We have some plans in place to serve those so there's no lift stations. And as a system, we wanna get rid of lift stations. - Yeah, I think that's really great. I know this is a little off topic. I was just curious if the other side of Elm Fork, I guess you'd probably be able to boost it across Elm Fork if needed, kind of lift it over as growth happens over there. All right, thank you. - I have just one. Have we worked with Correlo before? Or is this? - Yes, we have. - All right. - Yes. We have a couple of projects with them right now. - If there are no further questions, the Chair would entertain a motion. - So moved. - We have a motion for approval. Do we have a second? - Second. - Motion and a second. All in favor, say aye. - Aye. - The motion carries unanimously. Moving on to items for individual consideration. Item C, consider recommending adoption of an ordinance with the City of Denton with Rush Truck Centers through a buy board cooperative purchase agreement for five, for four, sorry, for one year with four additional years, total of five years for a cost of $14,679,000. - Correct, hi, good morning board. I'm Nicole Brasher, the administration manager for Fleet and Facilities. Here today seeking your recommendation for the approval of a contract through buy board with Rush Truck Center Crane, or Centers of Texas, sorry, for the five year not to exceed 14.6 million. Okay, the City of Denton Fleet Services purchases and repairs and maintains various types of heavy duty equipment utilized by departments like Solid Waste, Streets, Wastewater. They all support city services like street cleaning, refuse truck cleanup, or refuse pickups, sorry, and debris removal, as well as waterline flushing. Repair services provided by this contract ensure that the assets requiring specialized diagnostic equipment and technical knowledge remain operational. All vehicles and equipment additions will be processed through the city's annual budget process. The city will only pay for services rendered and is not obligated to pay the full contract amount unless needed. The charts highlight the contract's estimated cost breakdown by fiscal year, projected acquisition schedule based on the addition and replacement of assets needed, and the utilization rate by fund for acquisitions and services, all of which are routed through the city's collaborative budget process. Staff recommends approval of the one year with four additional one year extensions in the total five year, not to exceed amount of the rest trucks center of Texas for 14,679,000. Oops, sorry. Any questions? - Do we have any questions? Mr. Rayner? - How many Peterbilt trucks do we have? - Roughly 115. - So they're primary purchaser, we purchase, no? - No, they're just one of the options that we can buy the bodies from. - And so this particular company, their specialty is Peterbilt trucks? - Yes, they do more than that. - And so do we have others that have specialties for whatever the other vehicles are? - Correct, so any branded vehicle can be specialized diagnostics by that seller, essentially the manufacturer. - And the purpose to have that specialty on that person is better for the city than if we had just a regular, pardon the expression, a mechanic that can cover them all. - We do that as well, yeah. Fleet Services does. - So you cover everything, you got all of it? - Pretty much, we try to open up our capacity and authority for all the options as needed to optimize our acquisition process, get trucks into service as fast as we can. - And have we had a Peterbilt specialist before? - Yes, we've used this contract before. - And so is this the same company we're renewing on? - Correct. - Okay, thank you, that helps, appreciate it. Any further questions? Do we have a motion? We have a motion for approval and a second? All in favor say aye. - Thank you. - Motion carries unanimously. And now we'll move on to item D, management reports. - Mr. Chair, members of the board, we do have a follow-up item from Seth Garcia. This is a couple of questions that Mr. Rybak had, he's not here today, but Seth is here, if anyone has any follow-up questions on that particular item. Okay, and then for future agenda items, of course just again, another reminder, budget, budget, budget, right? That's coming up here pretty quick for you. Certainly looking forward to those discussions, our budget team will be bringing that forward to you guys. And then nothing on the new business action item other than the update on the quarterly reports that the water department's doing. I think the next was scheduled for July 13th. And then finally, I did send you guys an email with a recap of the den renewable goal. Certainly if you have any questions today, or if we need to put it on the next agenda for further discussion, I'm happy to do that. That's all we have. - Okay, with that, we stand adjourned.
Agenda
5 pages
City of Denton City Hall 215 E. McKinney St. Denton, Texas 76201 www.cityofdenton.com Meeting Agenda Public Utilities Board Monday, June 8, 2026 9:00 AM Council Work Session Room REGISTRATION GUIDELINES FOR ADDRESSING THE PUBLIC UTILITIES BOARD Citizens will be able to participate in the following way: • eComment – The agenda was posted online at https://tx-denton.civicplus.com/242/ Public-Meetings-Agendas. Once the agenda is posted, a link to make virtual comments using the eComment module will be made available next to the meeting listing on the Upcoming Events Calendar. Using eComment, Individuals may indicate support or opposition and submit a brief comment about a specific agenda item. eComments may be submitted up until the start of the meeting at which time the ability to make an eComment will be closed. eComments will be sent directly to members of the Public Utilities Board immediately upon submission and recorded by the Secretary into the Minutes of the Meeting. After determining that a quorum is present, the Public Utilities Board of the City of Denton, Texas will convene in a Regular Meeting on Monday, June 8, 2026 at 9:00 a.m. in the Council Work Session Room at City Hall, 215 E. McKinney Street, Denton, Texas at which the following items will be considered: REGULAR MEETING 1. PRESENTATIONS FROM MEMBERS OF THE PUBLIC This section of the agenda permits a person to make comments regarding public business on items as listed on the agenda. Each speaker will be allowed a maximum of four (4) minutes. Such person(s) shall have registered under the REGISTRATION GUIDELINES FOR ADDRESSING THE PUBLIC UTILITIES BOARD detailed at the beginning of this agenda. Registration is required prior to the time this agenda item is read into the record. 2. CONSENT AGENDA Each of the items on the Consent Agenda is recommended by the Staff and approval thereof will be strictly on the basis of the Staff recommendations. Approval of the Consent Agenda authorizes the City Manager …

... (truncated, showing first 2000 characters)