 Good afternoon at 4.31 p.m. this Wednesday, October 22nd, 2025, I will call this meeting

00:00:12.440 --> 00:00:16.920
 of the work session for the City of Denton Planning and Zoning Commission to order with

00:00:16.920 --> 00:00:20.120
 a quorum present.

00:00:20.120 --> 00:00:26.000
 Our first item is any citizen comments on the consent agenda.

00:00:26.000 --> 00:00:30.600
 I don't see anyone wishing to speak on those.

00:00:30.600 --> 00:00:35.920
 Next we have clarification for items on the agenda.

00:00:35.920 --> 00:00:41.720
 Any questions on the item, on the consent agenda from the commission members?

00:00:41.720 --> 00:00:46.880
 No, okay.

00:00:46.880 --> 00:00:55.760
 Individual consideration items, there were one update here.

00:00:55.760 --> 00:00:59.640
 Any questions on the calendar?

00:00:59.640 --> 00:01:09.880
 Staff does a pretty good job of this, but sometimes we've caught a few things.

00:01:09.880 --> 00:01:19.600
 Okay, let's go ahead and take a look at the consent, I mean, individual consideration

00:01:19.600 --> 00:01:24.720
 item, first one.

00:01:24.720 --> 00:01:28.640
 The plat, correct?

00:01:28.640 --> 00:01:33.520
 Yes, sorry.

00:01:33.520 --> 00:01:36.680
 Good afternoon, Angie Manglars, Assistant Planning Director.

00:01:36.680 --> 00:01:41.760
 This is a final plat for the reserve at Brush Creek.

00:01:41.760 --> 00:01:45.680
 It is a plan development with the base zoning of R4.

00:01:45.680 --> 00:01:50.320
 At this time, this final plat is not meeting our criteria for approval.

00:01:50.320 --> 00:01:55.400
 Staff is recommending denial, but does not have any objection to the request of extension,

00:01:55.400 --> 00:01:57.920
 which could be granted to November 17th.

00:01:57.920 --> 00:02:02.560
 This would be their second extension request, and I'm happy to answer any questions you

00:02:02.560 --> 00:02:05.920
 all may have.

00:02:05.920 --> 00:02:06.920
 Any questions?

00:02:06.920 --> 00:02:10.280
 I don't see any, thank you.

00:02:10.280 --> 00:02:18.840
 Then the second item, 4C, FR250020, good afternoon, Julie.

00:02:18.840 --> 00:02:28.360
 I'm presenting FR250020, it is a replat of the Eden Village development located just

00:02:28.360 --> 00:02:32.120
 on the west side of Loop 288, south of Audra.

00:02:32.120 --> 00:02:35.840
 It is a fourplex development, triplex and fourplex development.

00:02:35.840 --> 00:02:41.560
 They have addressed all of staff's comments, so I don't know if you received that email

00:02:41.560 --> 00:02:47.240
 this afternoon, but staff modified their recommendation to approval, and I will be happy to answer

00:02:47.240 --> 00:02:48.960
 any questions.

00:02:48.960 --> 00:02:51.840
 Any questions on this?

00:02:51.840 --> 00:02:57.960
 The updated plat was sent by email, so okay, I don't see anything, thank you, Julie.

00:02:57.960 --> 00:03:05.160
 Brings us to our public hearings, item 5A, HL250002.

00:03:05.160 --> 00:03:13.440
 Good afternoon, Cameron Robertson, Historic Preservation Officer.

00:03:13.440 --> 00:03:17.540
 For many of y'all, this is the first time you're seeing a historic landmark designation

00:03:17.540 --> 00:03:21.720
 come through, so I just wanted to do a brief education portion, and then I'll go into my

00:03:21.720 --> 00:03:22.720
 summary slide.

00:03:22.720 --> 00:03:27.320
 Just to give you all some background of what a historic landmark is defined as within the

00:03:27.320 --> 00:03:31.960
 city of Denton, it is officially recognized by the city for its outstanding architectural,

00:03:31.960 --> 00:03:37.320
 archaeological, cultural, social, economic, political, historical significance, so it

00:03:37.320 --> 00:03:39.000
 can be any one of those things.

00:03:39.000 --> 00:03:44.640
 Presently, the city of Denton does have 68 local historic landmark designations, three

00:03:44.640 --> 00:03:50.120
 of those which actually came forward to the P&Z during 2024.

00:03:50.120 --> 00:03:53.600
 It is a zoning action, so it is a three-step process.

00:03:53.600 --> 00:03:57.400
 It has already gone to the Historic Landmark Commission, it is now coming forward to the

00:03:57.400 --> 00:04:03.280
 Planning and Zoning Commission, and then it will later go to the city council.

00:04:03.280 --> 00:04:08.560
 Just some benefits of historic landmark designations, it does appreciate a greater rate.

00:04:08.560 --> 00:04:12.560
 Staff has actually done research for this, and it is true, a lot of the times people

00:04:12.560 --> 00:04:15.840
 hear that it's rumor, but it's actually the case.

00:04:15.840 --> 00:04:20.400
 It is eligible for a local historic tax exemption here in Denton, and there's also that visible

00:04:20.400 --> 00:04:23.040
 recognition of the plaque on the property.

00:04:23.040 --> 00:04:28.520
 It does also encourage better design, as sometimes, depending on the work that's being done, the

00:04:28.520 --> 00:04:31.920
 Historic Landmark Commission does review those projects.

00:04:31.920 --> 00:04:40.200
 It protects from swift demolition, and then it also increases community pride and awareness.

00:04:40.200 --> 00:04:45.640
 The request for this evening is a historic landmark designation for 3316 Roselon Drive.

00:04:45.640 --> 00:04:51.240
 It does meet approval criteria 359 and 11 from our Denton Development Code.

00:04:51.240 --> 00:04:54.200
 It is the zoning of R4, so that residential zoning.

00:04:54.200 --> 00:05:01.280
 It meets our goal CC2 of the Denton 2040 Comprehensive Plan, as well as goal number one, policy 1.3

00:05:01.280 --> 00:05:06.400
 of our 2019 Historic Preservation Plan, so staff is recommending approval, as it does

00:05:06.400 --> 00:05:15.280
 apply with the criteria from the Denton Development Code, as well as our two individual plans.

00:05:15.280 --> 00:05:17.760
 Any questions on this item?

00:05:17.760 --> 00:05:19.760
 Commissioner MacDuff?

00:05:19.760 --> 00:05:26.600
 Yes, I'm concerned that this was one of the founders of the Lions Club in Denton, and

00:05:26.600 --> 00:05:29.560
 so I just wanted to get that out there.

00:05:29.560 --> 00:05:31.440
 You know, that's of concern to me.

00:05:31.440 --> 00:05:35.800
 Not really a concern, but I appreciate putting it in there and giving us a perspective and

00:05:35.800 --> 00:05:37.320
 historical perspective on that.

00:05:37.320 --> 00:05:46.360
 My question is, did the owners come to you to make this request, and this was owner driven?

00:05:46.360 --> 00:05:47.360
 Yes.

00:05:47.360 --> 00:05:52.920
 In the e-commit that we had today, there were several, one of the neighbors said there were

00:05:52.920 --> 00:05:57.960
 some other houses in that same circle that could qualify as well on Roselon.

00:05:57.960 --> 00:06:00.120
 That was an interesting point.

00:06:00.120 --> 00:06:04.280
 Original four home locations that came in late, so it caught my eye.

00:06:04.280 --> 00:06:13.880
 But are there cases where the city identifies homes that might qualify for historical designations?

00:06:13.880 --> 00:06:14.920
 That's a great question.

00:06:14.920 --> 00:06:20.560
 So each month in front of the Historic Landmark Commission, the staff does bring forward a

00:06:20.560 --> 00:06:25.000
 reoccurring item where the Historic Landmark Commission can bring forward properties that

00:06:25.000 --> 00:06:30.720
 they believe are eligible for historic designation at the local level.

00:06:30.720 --> 00:06:35.560
 If everyone on the commission does agree that it needs to be added to the list, then staff,

00:06:35.560 --> 00:06:40.080
 myself as a historic preservation officer, sends a letter of designation interest to

00:06:40.080 --> 00:06:44.660
 the property owner, and then the property owner usually at that point tells staff whether

00:06:44.660 --> 00:06:50.440
 or not they want to pursue it, or they usually ask for additional information, at which point

00:06:50.440 --> 00:06:54.800
 staff does additional education and training, and then they can decide whether or not they

00:06:54.800 --> 00:06:57.040
 want to pursue the designation.

00:06:57.040 --> 00:07:01.760
 Is that on a cycle, or do you all do that on a cycle, where you identify?

00:07:01.760 --> 00:07:08.400
 It's just each month, if HLC brings forward a property that they're interested in designating.

00:07:08.400 --> 00:07:09.400
 Thank you.

00:07:09.400 --> 00:07:10.400
 Anything else?

00:07:10.400 --> 00:07:13.520
 I don't see anything.

00:07:13.520 --> 00:07:15.800
 Thank you very much, Cameron.

00:07:15.800 --> 00:07:26.360
 It brings us to second public hearing, PDA 0002.

00:07:26.360 --> 00:07:32.840
 Good evening, Julie Wyatt.

00:07:32.840 --> 00:07:40.100
 So tonight I'm presenting PDA 25-2, it's for a charter school.

00:07:40.100 --> 00:07:43.520
 Just a quick summary of the proposal.

00:07:43.520 --> 00:07:47.880
 So this is in Plan Development 139, it's about 15 acres.

00:07:47.880 --> 00:07:53.600
 It's located on the south side of Vintage, east of 35W.

00:07:53.600 --> 00:07:59.280
 The PD was approved in 1991, so it's one of our older PDs in the city.

00:07:59.280 --> 00:08:03.760
 And the purpose of the request tonight is to modify an approved site plan for the charter

00:08:03.760 --> 00:08:04.760
 school.

00:08:04.760 --> 00:08:13.120
 In 2020, the school came to the city and went through this process to lay out the site.

00:08:13.120 --> 00:08:18.320
 They have made some changes to their site plan, including removing about four and a

00:08:18.320 --> 00:08:23.960
 half acres from the north side of the site, reducing the building footprint and open space.

00:08:23.960 --> 00:08:29.440
 They are removing the high school for the time being, and then reconfiguring the parking

00:08:29.440 --> 00:08:30.440
 and access.

00:08:30.440 --> 00:08:33.720
 So really it is just related to that site plan.

00:08:33.720 --> 00:08:40.200
 Staff does recommend approval of the proposal as it does meet the criteria for approval,

00:08:40.200 --> 00:08:45.200
 and I will be happy to answer any questions.

00:08:45.200 --> 00:08:47.360
 Commissioner Dyer?

00:08:47.360 --> 00:08:55.000
 I'm going to assume that the applicant is obviously aware of the apartments in the new

00:08:55.000 --> 00:09:00.120
 travel gas station area that's going to be there, and they must, I'm assuming they must

00:09:00.120 --> 00:09:01.880
 be okay with that.

00:09:01.880 --> 00:09:07.800
 Having, you know, putting a school next to that, like does that, any of our planning

00:09:07.800 --> 00:09:12.200
 and zoning, like the buffers and things like that, does that conflict with it?

00:09:12.200 --> 00:09:15.760
 I mean, I know you were recommending, so everything must be good, right?

00:09:15.760 --> 00:09:20.600
 It meets all setback requirements and buffering requirements.

00:09:20.600 --> 00:09:26.080
 The apartments are there, so they are aware of that, and then they have been communicating

00:09:26.080 --> 00:09:34.040
 and regarding the other elements to the PD and that commercial use.

00:09:34.040 --> 00:09:39.420
 They went through the TIA process because they did a TIA in 2020, but a lot's changed

00:09:39.420 --> 00:09:42.640
 in the area, the multifamily and the commercial.

00:09:42.640 --> 00:09:48.480
 That's why I asked the question, because 2020, that's five years ago, and those items, you

00:09:48.480 --> 00:09:53.280
 know, the apartments and the travel center may not have been on the horizon then.

00:09:53.280 --> 00:09:58.220
 That is exactly right, and so that's why we had them update that TIA to bring in that

00:09:58.220 --> 00:10:00.240
 additional background traffic.

00:10:00.240 --> 00:10:03.720
 Does that answer your question?

00:10:03.720 --> 00:10:04.720
 Is that good?

00:10:04.720 --> 00:10:05.720
 Okay, good.

00:10:05.720 --> 00:10:06.720
 Anything else?

00:10:06.720 --> 00:10:07.720
 I don't see anything else.

00:10:07.720 --> 00:10:08.720
 Thank you, Julie.

00:10:08.720 --> 00:10:09.720
 All right.

00:10:09.720 --> 00:10:10.720
 Thank you.

00:10:10.720 --> 00:10:28.080
 That brings us to our last public hearing tonight, PD250004.

00:10:28.080 --> 00:10:29.080
 Hello again.

00:10:29.080 --> 00:10:30.080
 Angie Manglaris.

00:10:30.080 --> 00:10:34.160
 This is PD250004, Brush Creek Center.

00:10:34.160 --> 00:10:36.400
 Want to give a little bit of context on this one.

00:10:36.400 --> 00:10:41.080
 We just talked about the reserve at Brush Creek Final Platt, so this is a request for

00:10:41.080 --> 00:10:45.360
 a rezoning that is the remainder of that overall parent tract.

00:10:45.360 --> 00:10:51.320
 The subject property today is located at the intersection of Brush Creek and US377, two

00:10:51.320 --> 00:10:52.320
 primary arterials.

00:10:52.320 --> 00:10:58.640
 It is currently zoned Residential 1, and they are requesting to rezone to Plan Development

00:10:58.640 --> 00:11:00.360
 Suburban Corridor.

00:11:00.360 --> 00:11:07.040
 It's 2.63 acres of land, and really the purpose of the PD overlay is to provide additional

00:11:07.040 --> 00:11:12.960
 use restrictions and development standards to ensure compatibility in the area.

00:11:12.960 --> 00:11:17.360
 Initially, the Brush Creek project actually did come in as one zoning request for the

00:11:17.360 --> 00:11:21.500
 residential portion and the suburban corridor portion, and the Planning and Zoning Commission

00:11:21.500 --> 00:11:27.560
 in 2023 remanded it back to the applicant to take a closer look at what could be done,

00:11:27.560 --> 00:11:31.440
 including buffers and use standards, and so the applicant came back, or they came back

00:11:31.440 --> 00:11:36.120
 in two different waves, first the residential and now the commercial remainder.

00:11:36.120 --> 00:11:39.480
 So overall, this does comply with our criteria for approval.

00:11:39.480 --> 00:11:44.360
 It is consistent with the Comprehensive Plan and that neighborhood mixed use designation.

00:11:44.360 --> 00:11:47.800
 Staff is recommending approval, and I do have a longer presentation to go through during

00:11:47.800 --> 00:11:52.320
 regular session, but I'm happy to answer any questions you all may have now.

00:11:52.320 --> 00:12:01.000
 Any questions? Commissioner MacDuff? Yes, what were the neighbors' concerns when

00:12:01.000 --> 00:12:05.040
 this first went through, and then we opted for an overlay plan development?

00:12:05.040 --> 00:12:11.640
 Sure, so when this first came through in 2023, it was for the entire 18-acre tract.

00:12:11.640 --> 00:12:16.200
 Approximately 15 acres of those were residential, and primarily along this -- I mean, you can

00:12:16.200 --> 00:12:19.880
 see here what is now designated as PDR 4.

00:12:19.880 --> 00:12:23.880
 They were requesting, I believe it was an R6 zoning district at that time, which was

00:12:23.880 --> 00:12:28.200
 a little bit more dense than what is found in the ETJ as you continue to travel east

00:12:28.200 --> 00:12:29.720
 on Brush Creek Road.

00:12:29.720 --> 00:12:33.320
 So a lot of the concerns were related to that new residential use and some of the buffering

00:12:33.320 --> 00:12:35.800
 between existing homes and new homes.

00:12:35.800 --> 00:12:40.240
 So the applicant came back last year with a PDE for that residential portion.

00:12:40.240 --> 00:12:44.080
 The zoning district was residential R4 with a slightly larger lot size than what you would

00:12:44.080 --> 00:12:48.760
 see under today's R4 or standard R4 and some additional buffering.

00:12:48.760 --> 00:12:53.140
 They did choose to leave that commercial corner out, have had several neighborhood meetings.

00:12:53.140 --> 00:12:55.400
 Some of the concerns were what uses could be allowed there.

00:12:55.400 --> 00:12:59.880
 They are requesting suburban corridor, which does allow for some more intensive uses.

00:12:59.880 --> 00:13:05.080
 It is designed to be along roadways like Fort Worth Drive, a more high-traffic corridor.

00:13:05.080 --> 00:13:09.120
 And so by way of this PDE overlay, the applicant is restricting approximately -- I think it's

00:13:09.120 --> 00:13:14.040
 15 uses, and those are typically the more intensive uses that are allowed on suburban

00:13:14.040 --> 00:13:15.360
 corridor.

00:13:15.360 --> 00:13:19.800
 So it reduces some of those incompatibilities by ensuring those more intensive land uses

00:13:19.800 --> 00:13:20.800
 can't go in.

00:13:20.800 --> 00:13:21.800
 >> Okay.

00:13:21.800 --> 00:13:22.800
 Any other questions?

00:13:22.800 --> 00:13:23.800
 I don't see any.

00:13:23.800 --> 00:13:24.800
 Thank you.

00:13:24.800 --> 00:13:41.720
 That brings us to our work sessions for this afternoon.

00:13:41.720 --> 00:13:52.360
 First item is 3A, PZ25-189, report, discussion, and suggestions or recommendations on the

00:13:52.360 --> 00:14:03.920
 City of Denton criteria design criteria manual update.

00:14:03.920 --> 00:14:04.920
 >> Good afternoon.

00:14:04.920 --> 00:14:09.600
 I'm Brett Bourgeois, the City Engineer, and I'm here today to talk to you about our proposed

00:14:09.600 --> 00:14:14.120
 changes to the design criteria manual for the City of Denton.

00:14:14.120 --> 00:14:15.120
 So quick overview.

00:14:15.120 --> 00:14:20.140
 I know a lot of you are new, first time going through this process, so we have an outreach

00:14:20.140 --> 00:14:23.880
 plan that we like to do, kind of go through the background of what the criteria manuals

00:14:23.880 --> 00:14:27.640
 are, discuss some of the highlights of the updates that we're proposing and what our

00:14:27.640 --> 00:14:28.640
 next steps are.

00:14:28.640 --> 00:14:33.000
 These are very technical documents that are used to design all the different infrastructure

00:14:33.000 --> 00:14:34.240
 for the city.

00:14:34.240 --> 00:14:38.900
 So with that in mind, we have a whole staff of technical experts from the city on hand

00:14:38.900 --> 00:14:43.800
 to answer any questions that you may have that I cannot answer myself.

00:14:43.800 --> 00:14:47.400
 So the first thing we want to do is kind of discuss our public outreach plan.

00:14:47.400 --> 00:14:51.840
 It's a very lengthy process because we're impacting not only capital projects, but also

00:14:51.840 --> 00:14:52.840
 development projects.

00:14:52.840 --> 00:14:57.880
 We need buy-in from all the different boards and commissions, and so we started this process

00:14:57.880 --> 00:14:58.880
 off in September.

00:14:58.880 --> 00:15:03.080
 We sent a notice out to the development community that we are starting this revisions to our

00:15:03.080 --> 00:15:04.080
 criteria manual.

00:15:04.080 --> 00:15:08.920
 Today, or this morning, we had a developer town hall where we presented some of the highlights

00:15:08.920 --> 00:15:09.920
 of the revisions.

00:15:09.920 --> 00:15:14.440
 We're here today to present to you some of those highlights as well.

00:15:14.440 --> 00:15:19.440
 On Friday, we'll be posting the revised document online to solicit public comment and feedback

00:15:19.440 --> 00:15:23.320
 from the development community and other engineering communities.

00:15:23.320 --> 00:15:27.800
 In November, we'll be presenting to the Texas Society of Professional Engineers, as well

00:15:27.800 --> 00:15:32.320
 as publishing in the newspaper for a public hearing for the adoption of it.

00:15:32.320 --> 00:15:38.200
 We'll go to Mobility Committee, BUB, and then finally City Council in December with an effective

00:15:38.200 --> 00:15:40.600
 date, planned effective date of January 1st.

00:15:40.600 --> 00:15:48.800
 So it's kind of a big push to get all the information out of what we're proposing.

00:15:48.800 --> 00:15:51.040
 So a little background on how we do this.

00:15:51.040 --> 00:15:56.080
 So the criteria manuals touch many departments, if not all departments within the city.

00:15:56.080 --> 00:15:59.760
 So we had a series of meetings in September where we brought together representatives

00:15:59.760 --> 00:16:03.520
 from all the different departments, directors, and their technical staff.

00:16:03.520 --> 00:16:06.840
 We walked through all the proposed, all the criteria manuals.

00:16:06.840 --> 00:16:11.320
 We had, throughout the year and the course of the time, we collect comments from the

00:16:11.320 --> 00:16:14.580
 different departments and different community that we keep track of.

00:16:14.580 --> 00:16:15.580
 We've made all those edits.

00:16:15.580 --> 00:16:19.080
 We said this is what it would look like, based on all the comments you'll have.

00:16:19.080 --> 00:16:20.080
 Let's talk about it.

00:16:20.080 --> 00:16:23.760
 Let's go through these comments, see ones that work or are conflict with each other.

00:16:23.760 --> 00:16:27.240
 So a series of those meetings.

00:16:27.240 --> 00:16:29.400
 We got a draft document together.

00:16:29.400 --> 00:16:33.560
 Now we are going out for public comment with that draft document and then we're doing all

00:16:33.560 --> 00:16:37.480
 the public outreach, posting online newspaper articles, and then we're going to bring it

00:16:37.480 --> 00:16:43.960
 to all the boards and commissions and city council for public hearing and adoption.

00:16:43.960 --> 00:16:46.720
 The city of Denton has multiple governing documents.

00:16:46.720 --> 00:16:49.520
 So there is a hierarchy to these governing documents.

00:16:49.520 --> 00:16:55.140
 The top document is the Denton Development Code that sets all the regulations and policies

00:16:55.140 --> 00:17:01.160
 and procedures for zoning, subdivisions, different regulations, et cetera.

00:17:01.160 --> 00:17:04.520
 Once that's mainly what you guys all see right with all the planners bringing all that stuff

00:17:04.520 --> 00:17:05.520
 forward.

00:17:05.520 --> 00:17:08.920
 Once all that's been approved, they go into design and that's where our design document

00:17:08.920 --> 00:17:12.120
 comes in where we say this is the type of pipe you need to have.

00:17:12.120 --> 00:17:13.480
 This is the slope we need it to be.

00:17:13.480 --> 00:17:18.360
 This is what you need to consider for your traffic, for your whatever it is.

00:17:18.360 --> 00:17:23.000
 So we go into a much more technical side of the document, the design process.

00:17:23.000 --> 00:17:27.800
 Beyond that, when we go to construction, we have what are called construction specifications.

00:17:27.800 --> 00:17:32.200
 We maintain those as well that says, okay, well, this is how you actually build it now.

00:17:32.200 --> 00:17:33.680
 This is the way you're supposed to install it.

00:17:33.680 --> 00:17:35.700
 This is the way that it's supposed to be checked.

00:17:35.700 --> 00:17:39.640
 This is the standards of the materials that we need to meet, all that kind of technical

00:17:39.640 --> 00:17:40.640
 information.

00:17:40.640 --> 00:17:45.560
 And then we also have and maintain a standard set of standard details which show how they're

00:17:45.560 --> 00:17:46.920
 actually supposed to construct it.

00:17:46.920 --> 00:17:52.940
 So we have guidance, we have requirements, we have technical guidance, and we also have

00:17:52.940 --> 00:17:56.840
 graphical pictures of how it's actually supposed to be installed and constructed.

00:17:56.840 --> 00:17:58.040
 So all these documents work together.

00:17:58.040 --> 00:18:02.720
 They all kind of touch different aspects of the development or of a project life cycle.

00:18:02.720 --> 00:18:09.480
 And so the one that we're talking about today is the criteria manual, second one down.

00:18:09.480 --> 00:18:12.920
 So getting to some of the quick highlights.

00:18:12.920 --> 00:18:17.040
 The Solid Waste Criteria Manual only had one revision this year, it's looking at having

00:18:17.040 --> 00:18:21.280
 side load for their enclosures for the properties that they have restrictions, they can't get

00:18:21.280 --> 00:18:22.280
 in front load.

00:18:22.280 --> 00:18:24.080
 They removed that a few years ago.

00:18:24.080 --> 00:18:27.600
 They found that they do have restrictions on some properties still, so we need to get

00:18:27.600 --> 00:18:33.960
 that flexibility for developments that have side load for their garbage collection.

00:18:33.960 --> 00:18:37.800
 For the Stormwater Criteria Manual, we received a lot of feedback from the development community

00:18:37.800 --> 00:18:40.680
 about why do we only use reinforced concrete pipe?

00:18:40.680 --> 00:18:43.240
 Why don't we allow other products?

00:18:43.240 --> 00:18:47.800
 We did a series of brought in vendors with their products.

00:18:47.800 --> 00:18:52.520
 We talked to other municipalities, we went and saw them and saw how they install it,

00:18:52.520 --> 00:18:54.600
 how they operate, got their feedback on it.

00:18:54.600 --> 00:18:59.200
 And after a series of conversations and meetings, we decided to allow polypropylene pipe, which

00:18:59.200 --> 00:19:02.280
 is an alternative to reinforced concrete.

00:19:02.280 --> 00:19:08.160
 This we hope will drive the lower costs overall, because now there's competition in the marketplace.

00:19:08.160 --> 00:19:12.760
 Polypropylene pipe is generally less expensive than reinforced concrete, and we feel very

00:19:12.760 --> 00:19:16.840
 confident it's going to be an equally good product.

00:19:16.840 --> 00:19:20.840
 Then also one of the other revisions that we have this year is that last round we went

00:19:20.840 --> 00:19:28.040
 through, we recommended improvements for larger developments over one acre in size, we asked

00:19:28.040 --> 00:19:32.840
 them to consider treating the water quality of the runoff separately.

00:19:32.840 --> 00:19:36.520
 So we have detention, then we have water quality, so we have a flood protection and then a water

00:19:36.520 --> 00:19:40.080
 quality aspect, before everything was all combined together.

00:19:40.080 --> 00:19:45.480
 We recommended last revision, hey, start considering these two things separately, because that's

00:19:45.480 --> 00:19:50.720
 the regional requirement with I-SWEM, and that's the direction the EPA is going with

00:19:50.720 --> 00:19:56.080
 the federal requirements, and we have an MS4 permit with the federal government that we

00:19:56.080 --> 00:19:58.840
 need to match EPA requirements.

00:19:58.840 --> 00:20:01.040
 So we put this out of the recommendation.

00:20:01.040 --> 00:20:04.240
 Now we're coming around saying, okay, this is now going to be a requirement, it's going

00:20:04.240 --> 00:20:08.440
 to put us in line with the regional guidance and in line with the future EPA update.

00:20:08.440 --> 00:20:11.920
 So we're just kind of getting a little bit ahead of the horse, a little bit ahead of

00:20:11.920 --> 00:20:17.480
 the curve, but we're in line with the regional requirements there.

00:20:17.480 --> 00:20:21.960
 The transportation criteria manual had a pretty big revision this year.

00:20:21.960 --> 00:20:23.920
 We added some new roadway collections.

00:20:23.920 --> 00:20:27.640
 We did some discussion on how to handle school areas.

00:20:27.640 --> 00:20:31.480
 We removed the bike ped traffic impact analysis that we added a couple of years ago, a couple

00:20:31.480 --> 00:20:36.040
 of revisions ago, mainly because it's not industry standard and no one really knew how

00:20:36.040 --> 00:20:38.520
 to apply and how to effectively use it.

00:20:38.520 --> 00:20:42.880
 It was something we created to see if we can improve bike ped access.

00:20:42.880 --> 00:20:43.880
 We can do that other way.

00:20:43.880 --> 00:20:44.880
 So we took that out.

00:20:44.880 --> 00:20:49.680
 It was just a conflicting requirement and our criteria, and we updated other sections

00:20:49.680 --> 00:20:56.400
 on on-street parking and traffic calming measures.

00:20:56.400 --> 00:21:00.840
 For the water waste water, we had a pretty big overhaul, not on the technical side, but

00:21:00.840 --> 00:21:03.040
 of the readability and the organization of it.

00:21:03.040 --> 00:21:07.880
 So a lot of the edits are mainly just changing how the document is read and the order of

00:21:07.880 --> 00:21:08.880
 things.

00:21:08.880 --> 00:21:10.680
 It's mostly the same technical side.

00:21:10.680 --> 00:21:14.960
 On the technical stuff that did change is that we are asking for geotechnical reports

00:21:14.960 --> 00:21:17.760
 and we're asking for cathodic protection design.

00:21:17.760 --> 00:21:22.620
 So soils have corrosive materials, it degrades pipe over time.

00:21:22.620 --> 00:21:26.760
 You can put a cathodic protection on that extends the life of the like the metal ductile

00:21:26.760 --> 00:21:27.800
 iron pipes, et cetera.

00:21:27.800 --> 00:21:30.160
 So we've asked for that to be included in the requirements.

00:21:30.160 --> 00:21:36.240
 We've also did some lift station improvements to provide better design site design requirements

00:21:36.240 --> 00:21:39.640
 for lift stations.

00:21:39.640 --> 00:21:43.680
 For the street lights, one of the things that we we did, we added a new street light pole

00:21:43.680 --> 00:21:45.480
 that was asked for by the developers.

00:21:45.480 --> 00:21:50.720
 We included that in here and we also have clarified the process for adding and removing

00:21:50.720 --> 00:21:57.240
 street lighting and then we also added a new section to the criteria manual this year,

00:21:57.240 --> 00:21:59.600
 one on the environmentally sensitive areas.

00:21:59.600 --> 00:22:05.120
 This is information that was mainly stored just in staff's brains and made it hard if

00:22:05.120 --> 00:22:06.840
 we ever have staff turnover.

00:22:06.840 --> 00:22:09.800
 We don't have a clear way to have this written out, so we went through and we wrote this

00:22:09.800 --> 00:22:14.760
 all out, how to identify an environmentally sensitive area, how to treat it, how to design

00:22:14.760 --> 00:22:16.160
 for it, what you have to do.

00:22:16.160 --> 00:22:21.680
 So that was a whole new section that was added to the criteria manual this year.

00:22:21.680 --> 00:22:27.760
 Again, this slide is actually old as of this morning because we did finish the internal

00:22:27.760 --> 00:22:31.680
 revisions so that's where we're going to be posting it online on Friday.

00:22:31.680 --> 00:22:34.400
 We are asking for public feedback.

00:22:34.400 --> 00:22:37.220
 We are going to be presenting to all these different agencies.

00:22:37.220 --> 00:22:41.120
 The next one up is going to be the Texas Society of Professional Engineers, which is a professional

00:22:41.120 --> 00:22:45.240
 organization of engineers and then we're going to all the different boards and committees

00:22:45.240 --> 00:22:50.640
 with an adoption of effective date of January 1st as our goal.

00:22:50.640 --> 00:22:53.000
 I'll stand for any questions.

00:22:53.000 --> 00:23:00.600
 This is the first time since a few new members, so I'll just let everybody know that this

00:23:00.600 --> 00:23:05.080
 is one of my favorite work sessions of the year, if you can imagine so.

00:23:05.080 --> 00:23:08.400
 This is where the rubber meets the road, I'll put it that way.

00:23:08.400 --> 00:23:09.760
 Commissioner McDuff?

00:23:09.760 --> 00:23:14.400
 I figured we'd hear from you first.

00:23:14.400 --> 00:23:21.080
 Well, this is a lot of engineer speak, but I do understand it conceptually and I appreciate

00:23:21.080 --> 00:23:26.000
 the importance of it and the thoroughness of your staff and you, sir.

00:23:26.000 --> 00:23:27.520
 We certainly do.

00:23:27.520 --> 00:23:35.200
 I guess if we could go back to that, the continuum, how this relates to the development codes,

00:23:35.200 --> 00:23:41.640
 that slide and I'm going to just ask a question, would the comprehensive plan be the block

00:23:41.640 --> 00:23:42.640
 to the left?

00:23:42.640 --> 00:23:47.760
 Yes, it would probably be one of the guiding document that leads to the development codes.

00:23:47.760 --> 00:23:51.800
 That would be another block above the comprehensive plan, correct?

00:23:51.800 --> 00:23:53.600
 Okay, excellent, excellent.

00:23:53.600 --> 00:23:59.600
 My other comment, just in general, how does this translate, this document, if you could

00:23:59.600 --> 00:24:06.480
 just give an overall answer, how does this translate to the quality of life for our citizens?

00:24:06.480 --> 00:24:15.360
 It provides long lasting infrastructure that increases the effectiveness of government

00:24:15.360 --> 00:24:16.360
 funds.

00:24:16.360 --> 00:24:22.240
 We're looking for having good quality of life, long lasting infrastructure that is good steward

00:24:22.240 --> 00:24:24.760
 of government funds to ensure public safety.

00:24:24.760 --> 00:24:30.200
 I might include that in here in one of the opening paragraphs.

00:24:30.200 --> 00:24:39.120
 I was interested in reading that and then just from what the work, if I may, Chair Pruitt,

00:24:39.120 --> 00:24:43.320
 I want to get my comments in before you launch off.

00:24:43.320 --> 00:24:48.560
 I'd like for us to focus on the ESA, I'm proud of us for putting that in there.

00:24:48.560 --> 00:24:54.400
 We've talked about that point in every proposal that we've considered because it's important

00:24:54.400 --> 00:25:01.240
 with all the growth, the environment's important to all of us and so I certainly appreciate

00:25:01.240 --> 00:25:03.440
 having that in there.

00:25:03.440 --> 00:25:11.880
 It's four feet, I'm going to ask a specific question, is four feet the distance from,

00:25:11.880 --> 00:25:13.520
 tell me what the four feet is.

00:25:13.520 --> 00:25:17.160
 Is that just a standard measurement?

00:25:17.160 --> 00:25:21.440
 It says it should not, the protective fencing and then it talks about a minimum of four

00:25:21.440 --> 00:25:22.560
 feet.

00:25:22.560 --> 00:25:26.560
 Four feet is included several spots.

00:25:26.560 --> 00:25:28.440
 I do not have the answer off the top of my head.

00:25:28.440 --> 00:25:33.080
 We can get the response back to you on that with our technical expert in the environmental

00:25:33.080 --> 00:25:35.600
 side.

00:25:35.600 --> 00:25:42.360
 I was just trying to think what size four feet is, not too big, maybe six feet might be better

00:25:42.360 --> 00:25:46.520
 but it seems a little short.

00:25:46.520 --> 00:25:50.520
 I can only speculate, I'm not the expert on that field so I can definitely get a comment

00:25:50.520 --> 00:25:53.040
 back to you or written response back to you if that works.

00:25:53.040 --> 00:25:56.960
 Sure, we're very interested in that and I think as a commission it's come up several

00:25:56.960 --> 00:25:57.960
 times.

00:25:57.960 --> 00:25:58.960
 Understandable.

00:25:58.960 --> 00:25:59.960
 Thank you.

00:25:59.960 --> 00:26:06.440
 Yes, Commissioner Riggs?

00:26:06.440 --> 00:26:11.680
 So we were actually discussing that in the DCRC, the four foot, and my understanding

00:26:11.680 --> 00:26:16.520
 is it's along the fence lines and that's so that it can be surveyed and so essentially

00:26:16.520 --> 00:26:21.280
 you can't survey it if you can't walk through it so essentially that's the minimum space

00:26:21.280 --> 00:26:26.280
 that would be needed in order to do that.

00:26:26.280 --> 00:26:43.040
 Hi, I'm Jennifer Avesi from Environmental Services and Sustainability.

00:26:43.040 --> 00:26:51.240
 I drafted that section with my supervisor, Joetta Daly, the reason we did pick that four

00:26:51.240 --> 00:26:58.460
 foot buffer is for surveying and for the width for equipment.

00:26:58.460 --> 00:27:04.120
 It's very similar to the amount of space that is required for trenching, for silt fencing.

00:27:04.120 --> 00:27:09.640
 So it really is a maintenance consideration, that buffer space.

00:27:09.640 --> 00:27:16.320
 Can I follow up to that?

00:27:16.320 --> 00:27:22.360
 I have another question for you.

00:27:22.360 --> 00:27:26.680
 So without it being the four foot, then it could be wider so essentially we're kind of

00:27:26.680 --> 00:27:31.880
 narrowing them down to a minimum amount that they can disturb with the four foot.

00:27:31.880 --> 00:27:32.880
 Yes.

00:27:32.880 --> 00:27:33.880
 Okay, perfect.

00:27:33.880 --> 00:27:34.880
 Thank you.

00:27:34.880 --> 00:27:35.880
 That's it.

00:27:35.880 --> 00:27:39.640
 I have one more question.

00:27:39.640 --> 00:27:42.200
 Please go.

00:27:42.200 --> 00:27:46.420
 So on the polypropylene pipe, that's not polyethylene, right?

00:27:46.420 --> 00:27:47.420
 No.

00:27:47.420 --> 00:27:48.420
 Okay.

00:27:48.420 --> 00:27:49.420
 Polypropylene.

00:27:49.420 --> 00:27:50.420
 So we did look at other pipes.

00:27:50.420 --> 00:27:56.640
 One of the other common ones is HDPE, high density polyethylene pipe, does not perform

00:27:56.640 --> 00:27:58.540
 as well as polypropylene.

00:27:58.540 --> 00:28:04.280
 So when we did look at them, the polypropylene is a much better product we feel and other

00:28:04.280 --> 00:28:09.820
 municipalities have also accepted that as an alternative side of the polyethylene, HDPE

00:28:09.820 --> 00:28:10.820
 or concrete.

00:28:10.820 --> 00:28:11.820
 Okay, thanks.

00:28:11.820 --> 00:28:12.820
 Yep.

00:28:12.820 --> 00:28:13.820
 Any other questions?

00:28:13.820 --> 00:28:14.820
 A couple.

00:28:14.820 --> 00:28:19.820
 Well, first of all, congratulations.

00:28:19.820 --> 00:28:20.820
 Thank you.

00:28:20.820 --> 00:28:26.200
 I think the last at least four years that we've had an update, it's been dumpster central

00:28:26.200 --> 00:28:29.840
 and it's always been longer, wider, bigger.

00:28:29.840 --> 00:28:36.320
 We want dumpster statues everywhere and now this is some additional flexibility.

00:28:36.320 --> 00:28:37.640
 So I thank you for that.

00:28:37.640 --> 00:28:43.700
 I think when we look at these documents, we have to be mindful that best laid intentions

00:28:43.700 --> 00:28:50.520
 do cost money and we don't want to inadvertently increase the cost of living in our city even

00:28:50.520 --> 00:28:52.320
 more than it already is.

00:28:52.320 --> 00:28:57.800
 I also took a trip recently to a couple different cities and saw dumpsters on wheels, believe

00:28:57.800 --> 00:28:58.800
 it or not.

00:28:58.800 --> 00:29:04.080
 They were about half size of your typical metal dumpster and they were poly something.

00:29:04.080 --> 00:29:09.320
 I couldn't claim to know what type of polymer or plastic they were, but it was an interesting

00:29:09.320 --> 00:29:16.760
 adaptation they had to work around some of their unique challenges.

00:29:16.760 --> 00:29:23.680
 I noticed in the storm water updates that there was a provision for inspections during

00:29:23.680 --> 00:29:30.800
 the development phase to provide a stop work order in certain conditions without getting

00:29:30.800 --> 00:29:34.360
 into specific projects.

00:29:34.360 --> 00:29:43.200
 Does that give us the necessary tools with lessons learned recently to be able to address

00:29:43.200 --> 00:29:47.320
 drainage problems during the development phase when they do occur?

00:29:47.320 --> 00:29:49.200
 Yeah, I believe so.

00:29:49.200 --> 00:29:54.320
 That's part of the intention of it is that we have a watershed inspections department

00:29:54.320 --> 00:29:57.920
 that is responsible and they maintain that contractors and developments are following

00:29:57.920 --> 00:30:01.840
 the proper storm water prevention processes.

00:30:01.840 --> 00:30:05.440
 This gives us some more teeth and more written down documentation that we have the ability

00:30:05.440 --> 00:30:08.640
 to enforce those requirements if they're not being followed.

00:30:08.640 --> 00:30:09.640
 Thank you.

00:30:09.640 --> 00:30:14.440
 I appreciate that.

00:30:14.440 --> 00:30:18.880
 In a similar vein, I think we've all learned a little bit of a thing or two about what

00:30:18.880 --> 00:30:23.800
 happens when a detention area is not maintained.

00:30:23.800 --> 00:30:30.800
 In that section, it didn't really change that much as far as the maintenance agreements

00:30:30.800 --> 00:30:32.520
 and that sort of thing.

00:30:32.520 --> 00:30:38.880
 Did staff talk in this cycle about potential ways in the future to make sure that that

00:30:38.880 --> 00:30:39.880
 maintenance happens?

00:30:39.880 --> 00:30:45.480
 I know that we're limited by staff capacity for inspections and that sort of thing.

00:30:45.480 --> 00:30:47.760
 What's our thinking of that going forward?

00:30:47.760 --> 00:30:50.600
 So you're absolutely right on that thought process.

00:30:50.600 --> 00:30:57.080
 The reason we put that, so what Commissioner or Chair Pruitt mentioned is that in the last

00:30:57.080 --> 00:31:02.760
 revision of the criteria manual, we created and included a storm water maintenance agreement.

00:31:02.760 --> 00:31:06.920
 So whenever a private development comes in and puts in a privately owned and operated

00:31:06.920 --> 00:31:12.440
 flood control structure as a detention pond, previously they'd put it in and walk away

00:31:12.440 --> 00:31:16.400
 and nobody knew who owned it, nobody knew who maintained it, nobody was maintaining

00:31:16.400 --> 00:31:21.080
 it, and we had no ability to come in and fix it.

00:31:21.080 --> 00:31:26.960
 So now we have a new document or new requirement in from our last revision almost two years

00:31:26.960 --> 00:31:32.240
 ago that says any development that's going to have a private detention pond, the attention

00:31:32.240 --> 00:31:36.440
 to an agreement says we understand that we own this, we're going to provide you an operation

00:31:36.440 --> 00:31:40.760
 and maintenance manual that we keep on staff, that we keep on hand, that they're required

00:31:40.760 --> 00:31:44.760
 to maintain and operate it appropriately, and if they don't, the city can come in and

00:31:44.760 --> 00:31:48.740
 fix it and recover costs as necessary.

00:31:48.740 --> 00:31:53.000
 So we did put that in, so a lot of the ones that we're seeing that have come up in the

00:31:53.000 --> 00:31:58.560
 last couple months are old ones that are grandfathered in, so it's very hard for us to go back and

00:31:58.560 --> 00:32:03.920
 require existing properties to adopt a new standard.

00:32:03.920 --> 00:32:07.920
 So that's kind of the gray area going forward, we shouldn't be seeing any of those anymore

00:32:07.920 --> 00:32:11.120
 since that revision went in last time.

00:32:11.120 --> 00:32:15.160
 So we don't anticipate any future problems similar to what we've had.

00:32:15.160 --> 00:32:18.320
 At least in developments that come new.

00:32:18.320 --> 00:32:19.320
 Correct.

00:32:19.320 --> 00:32:24.480
 So we've got a 40 or 50 year time period between now and when most of them are updated.

00:32:24.480 --> 00:32:29.000
 Yeah we're trying to figure out how do we address those ones and make them equitable

00:32:29.000 --> 00:32:32.040
 and fair to make standards.

00:32:32.040 --> 00:32:33.680
 That's good to hear.

00:32:33.680 --> 00:32:41.760
 And then last, I'd just like to hear some more information on the pedestrian bike removal

00:32:41.760 --> 00:32:45.920
 of that travel demand analysis.

00:32:45.920 --> 00:32:54.480
 My understanding before was that it was really designed to catch situations where you have

00:32:54.480 --> 00:33:03.320
 a development that you would expect an increased amount of activity of those modes, where there

00:33:03.320 --> 00:33:12.480
 were existing gaps in the network adjacent or nearby to the proposed development so that

00:33:12.480 --> 00:33:19.280
 we could treat modes of travel other than driving more similar to how we treat driving.

00:33:19.280 --> 00:33:24.360
 Totally understood that hey if that was just too confusing for people and I'm not against

00:33:24.360 --> 00:33:29.840
 removing it, I just want to understand, you mentioned we have other ways that we can handle

00:33:29.840 --> 00:33:36.820
 that, what's the process there and help me understand what that looks like so that our

00:33:36.820 --> 00:33:43.640
 community is not concerned about the removal.

00:33:43.640 --> 00:33:45.640
 Good evening committee and chair.

00:33:45.640 --> 00:33:47.820
 Chandra, city traffic engineer.

00:33:47.820 --> 00:33:51.800
 So we have streamlined the traffic studies right now.

00:33:51.800 --> 00:33:58.280
 We ask for generation numbers when the development comes in and then we go for a traffic scoping

00:33:58.280 --> 00:34:04.600
 meeting with the developers and then we catch all those and if it's a multi-family, if it's

00:34:04.600 --> 00:34:12.240
 next to a railroad, then there will be more people using pedestrians who will commute

00:34:12.240 --> 00:34:18.000
 back and forth so we catch them and we follow the mobility plan that identifies where the

00:34:18.000 --> 00:34:24.040
 bike trails, side paths need so we ask for the ten foot or five feet, all those will

00:34:24.040 --> 00:34:26.360
 be captured in the scoping meeting.

00:34:26.360 --> 00:34:32.880
 Okay and sorry to push on this, it's just this is the type of thing that can lose institutional

00:34:32.880 --> 00:34:39.040
 knowledge as years go forward and you know people change over, is that process within

00:34:39.040 --> 00:34:42.720
 that scoping meeting captured within a checklist or anything?

00:34:42.720 --> 00:34:45.120
 Yes, we have a broad range of checklists.

00:34:45.120 --> 00:34:50.160
 Okay and that includes specifically the ped and bike expected?

00:34:50.160 --> 00:34:56.640
 For connectivity and we take a look at where bike lanes are that needs to be continued

00:34:56.640 --> 00:34:59.840
 with side paths that needs to be made connections.

00:34:59.840 --> 00:35:02.000
 Okay, very good, thank you.

00:35:02.000 --> 00:35:09.480
 And then just one last question, not transportation related.

00:35:09.480 --> 00:35:14.960
 On the issue of detention ponds and maybe this is something to think about going forward,

00:35:14.960 --> 00:35:24.600
 I know there's been a lot of discussion lately about what type of vegetation is best serves

00:35:24.600 --> 00:35:31.640
 both the environmental needs of or the engineering needs of detention to reduce clogging and

00:35:31.640 --> 00:35:37.760
 that sort of thing but also meets the environmental goals of the community.

00:35:37.760 --> 00:35:43.120
 I didn't see anything specifically in there about you know the more native plantings and

00:35:43.120 --> 00:35:50.520
 where things like that should be focused because my take is the i-swim document really looks

00:35:50.520 --> 00:35:57.360
 more at what's necessary from a flow restriction perspective and doesn't necessarily look at

00:35:57.360 --> 00:35:59.840
 the native plantings aspect of things.

00:35:59.840 --> 00:36:04.080
 Is that something staff has considered or might consider going forward?

00:36:04.080 --> 00:36:08.000
 So one of those things that's kind of hard to quantify and calculate because every different

00:36:08.000 --> 00:36:11.900
 type of material has a different what's called a Manning's number in terms of how it restricts

00:36:11.900 --> 00:36:14.280
 or modifies the flow of water.

00:36:14.280 --> 00:36:19.760
 So usually on detention structure, flood control structures, you're looking for erosion protection,

00:36:19.760 --> 00:36:23.820
 not necessarily for native growth or different types of vegetation unless you're doing like

00:36:23.820 --> 00:36:28.120
 a wetland project or some sort of vernal pool or something like that.

00:36:28.120 --> 00:36:32.480
 So you're looking more for erosion prevention, something that can germinate pretty quickly,

00:36:32.480 --> 00:36:36.840
 provide stability to the soil slopes and the slopes are in such a way that it's able to

00:36:36.840 --> 00:36:38.000
 be mowed and maintained.

00:36:38.000 --> 00:36:42.280
 So I think that's a good idea, I think that's something we can definitely consider and see

00:36:42.280 --> 00:36:46.160
 if we can make any recommendations on that but we basically try to follow the engineering

00:36:46.160 --> 00:36:52.920
 standards of i-swim of we need to prevent these slopes from eroding over time and clogging

00:36:52.920 --> 00:36:53.920
 the drains.

00:36:53.920 --> 00:36:54.920
 Okay.

00:36:54.920 --> 00:36:55.920
 Yeah, understood.

00:36:55.920 --> 00:37:00.920
 I think we do a pretty good job of making sure that the engineering requirements are

00:37:00.920 --> 00:37:07.160
 met because that's kind of the silo where these criteria manuals live.

00:37:07.160 --> 00:37:11.520
 I would just say maybe especially as this gets forward to council, there may be some

00:37:11.520 --> 00:37:17.880
 more interest at that level to get two birds with one stone, if you will.

00:37:17.880 --> 00:37:20.500
 Yeah, we're here to receive comments and make edits.

00:37:20.500 --> 00:37:24.500
 So all your comments, we will go back and watch this and make sure that we can make

00:37:24.500 --> 00:37:29.840
 edits and updates as necessary and bring revised documents forward if that...

00:37:29.840 --> 00:37:30.840
 Okay.

00:37:30.840 --> 00:37:38.840
 Sorry, our floodplain administrator has a comment on this.

00:37:38.840 --> 00:37:41.680
 Good evening, Mike Linder, floodplain administrator.

00:37:41.680 --> 00:37:48.800
 I think something that speaks maybe a little bit to the concern there, in the additional

00:37:48.800 --> 00:37:54.200
 water quality requirements that are included here, what that really does is give developers

00:37:54.200 --> 00:37:56.960
 a lot more options to address that.

00:37:56.960 --> 00:38:01.860
 Previously, they were forced to...if they were doing detention, really the only method

00:38:01.860 --> 00:38:05.360
 that was open to them was extended detention where you're holding onto that water for a

00:38:05.360 --> 00:38:10.800
 longer time to allow the sediment to settle out, draining through these very small openings,

00:38:10.800 --> 00:38:13.360
 which lead to a lot of the clogging problems that we've seen.

00:38:13.360 --> 00:38:18.040
 So by kind of splitting these separately to say you can address the water quality elsewhere

00:38:18.040 --> 00:38:21.960
 on your site through something like a rain garden or a filter strip, or I think there's

00:38:21.960 --> 00:38:26.440
 something like 32 different options listed out in the I-swim manual, and a lot of those

00:38:26.440 --> 00:38:32.920
 do have more focus on the plantings and the vegetation because they're designed for infiltration

00:38:32.920 --> 00:38:37.840
 and water treatment rather than just a flood control structure to protect downstream.

00:38:37.840 --> 00:38:43.800
 So definitely we can look at incorporating more native plantings throughout the manual,

00:38:43.800 --> 00:38:46.920
 but I think that change will speak a little bit to that concern.

00:38:46.920 --> 00:38:47.920
 Okay.

00:38:47.920 --> 00:38:48.920
 Yeah, I appreciate it.

00:38:48.920 --> 00:38:53.640
 I think the reason I bring it up is just that there's a fairly sizable percentage of area

00:38:53.640 --> 00:38:59.680
 that ends up being used for detention, and so if there's an opportunity to, without putting

00:38:59.680 --> 00:39:05.660
 additional cost on the development, but just to guide things toward we know X is what's

00:39:05.660 --> 00:39:10.760
 typically done, if we do Y we can achieve those goals, but actually improve some other

00:39:10.760 --> 00:39:12.040
 things that we want to.

00:39:12.040 --> 00:39:17.080
 I don't know the details of that, but I'd be interested to see if there are opportunities

00:39:17.080 --> 00:39:21.920
 to get multi-use out of those land areas.

00:39:21.920 --> 00:39:22.920
 Absolutely.

00:39:22.920 --> 00:39:26.800
 I just wanted to comment on that.

00:39:26.800 --> 00:39:35.480
 One of the things that we, the intent of this change also, part of what this change we're

00:39:35.480 --> 00:39:39.920
 hoping to do is that because we were requiring, the old criteria required them to hold the

00:39:39.920 --> 00:39:44.160
 water longer, they were oversizing the detention ponds, so the detention ponds had to be larger

00:39:44.160 --> 00:39:47.240
 because they had to hold the water for a longer period of time.

00:39:47.240 --> 00:39:52.120
 By separating those two out you can have the water quality treatment of bio-soils and infiltration

00:39:52.120 --> 00:39:56.800
 gardens, rain gardens, et cetera, separately, and you can reduce the size of the detention

00:39:56.800 --> 00:39:57.800
 pond now.

00:39:57.800 --> 00:40:02.160
 So we're hoping to find that balance where we can reduce the detention pond size, but

00:40:02.160 --> 00:40:06.240
 also treat the water quality at the same time, so we're aware of that.

00:40:06.240 --> 00:40:07.240
 Okay.

00:40:07.240 --> 00:40:08.600
 That's good.

00:40:08.600 --> 00:40:13.540
 And I said that was the last, but I lied, there's one more.

00:40:13.540 --> 00:40:20.660
 This is more just future direction, it's not in scope for this year's updates, but at various

00:40:20.660 --> 00:40:32.080
 times in the past I've heard that there have been interests in providing for regional detention

00:40:32.080 --> 00:40:40.640
 solutions in order to remove some of the barriers of infill, especially as we've done our downtown

00:40:40.640 --> 00:40:48.240
 plan, and we have the stormwater master plan thing still going on.

00:40:48.240 --> 00:40:53.100
 Is that a goal that we're still looking toward and we're just not quite there yet?

00:40:53.100 --> 00:40:57.400
 That is something that we are looking, that we're working on, and it's not in the criteria

00:40:57.400 --> 00:41:00.240
 manual per se.

00:41:00.240 --> 00:41:05.280
 Generally regional detention is a capital project because it's affecting multiple properties.

00:41:05.280 --> 00:41:10.400
 We do have several in the city and we are currently working on another one right now.

00:41:10.400 --> 00:41:15.520
 So we do have regional detention, they follow the same general guide design requirements

00:41:15.520 --> 00:41:20.440
 of detention ponds are just much larger and bringing flows in from other areas.

00:41:20.440 --> 00:41:25.840
 So we do prefer regional detention, but those are generally a capital project and the city

00:41:25.840 --> 00:41:31.240
 would be the ones building that and then getting cost recovery from developers as they contribute

00:41:31.240 --> 00:41:33.360
 to it with their flows.

00:41:33.360 --> 00:41:34.360
 Okay.

00:41:34.360 --> 00:41:35.520
 Thank you very much.

00:41:35.520 --> 00:41:36.520
 Any other questions?

00:41:36.520 --> 00:41:37.520
 Oh, I'm sorry.

00:41:37.520 --> 00:41:42.480
 If you could come up to the mic, sorry, just for the video.

00:41:42.480 --> 00:41:48.280
 Hello, I'm Maria Ferraro with Watershed Protection.

00:41:48.280 --> 00:41:53.040
 We just wanted to add that in the environmentally sensitive areas design criteria section eight

00:41:53.040 --> 00:41:58.120
 that we're adding, we do have in the appendices, we added a vegetation list and that includes

00:41:58.120 --> 00:42:02.480
 the different types of vegetation, including wetland that may add some clarification and

00:42:02.480 --> 00:42:05.040
 help with that native seeding mix.

00:42:05.040 --> 00:42:06.040
 Very good.

00:42:06.040 --> 00:42:07.040
 Thank you.

00:42:07.040 --> 00:42:09.720
 Any other questions from the commission?

00:42:09.720 --> 00:42:10.720
 Commissioner McDuff?

00:42:10.720 --> 00:42:11.720
 Yes.

00:42:11.720 --> 00:42:12.720
 Any other questions?

00:42:12.720 --> 00:42:13.720
 Question, please.

00:42:13.720 --> 00:42:21.120
 Am I correct in knowing that this is an assimilation of the manuals that have been in several departments,

00:42:21.120 --> 00:42:22.720
 spread over several departments?

00:42:22.720 --> 00:42:26.760
 Yes, that was originally the case a couple of years ago.

00:42:26.760 --> 00:42:31.720
 Last year, our last revision we did, we combined all those documents into one to mirror what

00:42:31.720 --> 00:42:37.320
 we have in the tenant development code and provide a more cohesive unified document and

00:42:37.320 --> 00:42:38.960
 so that's what we've been going forward with.

00:42:38.960 --> 00:42:39.960
 Yeah, that's great.

00:42:39.960 --> 00:42:40.960
 Thank you.

00:42:40.960 --> 00:42:41.960
 Thank you.

00:42:41.960 --> 00:42:42.960
 Commissioner Vicks?

00:42:42.960 --> 00:42:50.560
 Yeah, I just have a couple comments and then one question, so I think it would definitely

00:42:50.560 --> 00:42:55.320
 be good if you listed the water quality kind of trade-offs that you're doing in the future

00:42:55.320 --> 00:42:57.440
 presentations because I know that you'll get asked that.

00:42:57.440 --> 00:42:58.440
 Okay.

00:42:58.440 --> 00:43:04.160
 But also, I had a question on the TIAs, it used to be 100 trips, now it's 50 trips.

00:43:04.160 --> 00:43:07.840
 What was the driving force for that?

00:43:07.840 --> 00:43:17.000
 I'm trying to decide between who's going to answer that question.

00:43:17.000 --> 00:43:22.080
 Good evening, Chair and Commissioner.

00:43:22.080 --> 00:43:25.560
 This is Rakibul Alam, the transportation planner.

00:43:25.560 --> 00:43:33.440
 So our checklist has this 50 trips threshold, but our TIA was kind of outdated, so you want

00:43:33.440 --> 00:43:41.440
 to just be consistent with the TIA.

00:43:41.440 --> 00:43:43.360
 Thank you.

00:43:43.360 --> 00:43:44.360
 Consistency is good.

00:43:44.360 --> 00:43:45.360
 Thank you.

00:43:45.360 --> 00:43:47.160
 I don't see any other questions.

00:43:47.160 --> 00:43:50.160
 Thank you very much.

00:43:50.160 --> 00:43:51.160
 Thank you.

00:43:51.160 --> 00:44:05.960
 That brings us to our second work session item, sorry, the PZ25204, hold the discussion,

00:44:05.960 --> 00:44:09.720
 give staff direction regarding Craver Ranch plan development.

00:44:09.720 --> 00:44:13.200
 Good afternoon, Chair and Commission members.

00:44:13.200 --> 00:44:16.440
 Charlie Rosadal, interim director of development services.

00:44:16.440 --> 00:44:21.520
 This item for you today is to introduce the Craver Ranch development, to go over some

00:44:21.520 --> 00:44:27.840
 of the deal points for a project and operating agreement, and then the developer has represented

00:44:27.840 --> 00:44:32.000
 us here as well, and they'll be doing a presentation.

00:44:32.000 --> 00:44:37.480
 Just so you can see down here below, some of the items will be coming before PNZ and

00:44:37.480 --> 00:44:39.320
 City Council in the future.

00:44:39.320 --> 00:44:44.040
 The project and operating agreements will go before City Council on December 2nd.

00:44:44.040 --> 00:44:48.880
 You'll see a plan development zoning case, comprehensive plan amendments, and a mobility

00:44:48.880 --> 00:44:55.000
 plan amendment come before this body on the November 19th meeting.

00:44:55.000 --> 00:45:01.080
 And just see it down here in the lower right section, just to give the PNZ a little background

00:45:01.080 --> 00:45:05.520
 on how the agreements work, we have with the developer.

00:45:05.520 --> 00:45:10.600
 So we would have a project agreement, what's typically considered a development agreement,

00:45:10.600 --> 00:45:16.440
 with the developer, and then they also are intending, they have created and intend to

00:45:16.440 --> 00:45:23.600
 use a municipal management district for the operation of the ranch itself and the project.

00:45:23.600 --> 00:45:31.360
 And then the developer would construct projects and then be reimbursed through the district.

00:45:31.360 --> 00:45:34.640
 So this is an overview of the project site.

00:45:34.640 --> 00:45:40.080
 You can see it's in northern Denton, just south of the Lake Ray Roberts Dam.

00:45:40.080 --> 00:45:48.720
 It's bordered by FM 2164 on the west, well, it's 2153, and you can see 455 here as well.

00:45:48.720 --> 00:45:54.320
 And then on the southern border, it's Gribble Springs and Sheppard Road.

00:45:54.320 --> 00:45:59.560
 A little background on the property itself.

00:45:59.560 --> 00:46:04.440
 So Craver Ranch was annexed into the city in 2008 and 2009.

00:46:04.440 --> 00:46:07.480
 In total, it's 2,870 acres.

00:46:07.480 --> 00:46:11.360
 This project in particular is 2,500 acres.

00:46:11.360 --> 00:46:14.080
 The developer is Old Prosper Partners.

00:46:14.080 --> 00:46:19.160
 We began this process with them in November of 2024.

00:46:19.160 --> 00:46:25.640
 And then the city council took action in March of 2025 to approve consent for a resolution

00:46:25.640 --> 00:46:31.440
 for creation of the municipal management district at the legislature.

00:46:31.440 --> 00:46:36.280
 That consent was contingent on them doing a development agreement with the city so that

00:46:36.280 --> 00:46:41.080
 we can ensure that we walk through the various things that would be needed for the development.

00:46:41.080 --> 00:46:47.680
 So we've been meeting with them since March to go over these different negotiating terms.

00:46:47.680 --> 00:46:52.840
 And we've conducted studies related to these as well as a fiscal impact study, facilities

00:46:52.840 --> 00:46:56.520
 study, a travel demand model in water and wastewater.

00:46:56.520 --> 00:47:02.400
 And a few of these studies are still being finalized.

00:47:02.400 --> 00:47:05.480
 So a little background on what a municipal management district is.

00:47:05.480 --> 00:47:11.700
 It's a separate political subdivision that's created to use property taxes or collect assessments

00:47:11.700 --> 00:47:17.760
 from property owners within a district to fund infrastructure.

00:47:17.760 --> 00:47:23.040
 So this one in particular will levy assessments for properties within the district.

00:47:23.040 --> 00:47:26.280
 And it was created by the Texas legislature.

00:47:26.280 --> 00:47:30.180
 So using the district, the developer would front the cost for the public infrastructure

00:47:30.180 --> 00:47:33.240
 and then be reimbursed through the district.

00:47:33.240 --> 00:47:36.960
 And then those revenues that they receive from the assessments would go back to pay

00:47:36.960 --> 00:47:41.880
 the bonds that are used within that district.

00:47:41.880 --> 00:47:47.520
 Again, this is a 2,500 acre development.

00:47:47.520 --> 00:47:52.160
 In total, they're proposing just under 9,200 residential units.

00:47:52.160 --> 00:47:58.480
 You can see the breakout here between single townhome, zero lot line and multifamily units.

00:47:58.480 --> 00:48:03.880
 In addition to that, they're proposing 1.2 million square feet of commercial space.

00:48:03.880 --> 00:48:09.800
 And then this property also is segmented into two independent school districts on the western

00:48:09.800 --> 00:48:13.400
 portion of the property as it's Sager independent school district.

00:48:13.400 --> 00:48:17.680
 And then on the eastern portion of the property, it's then independent school district.

00:48:17.680 --> 00:48:22.240
 But the entirety of the property is within the city limits of Denton.

00:48:22.240 --> 00:48:27.800
 In total, they're proposing $462 million in public infrastructure and have a 17 year construction

00:48:27.800 --> 00:48:32.360
 timeline.

00:48:32.360 --> 00:48:37.840
 Infrastructure that's being proposed for this development for water, they would use existing

00:48:37.840 --> 00:48:38.840
 infrastructure.

00:48:38.840 --> 00:48:44.080
 The city has a transmission line that runs from the Lake Roberts treatment plant down

00:48:44.080 --> 00:48:45.680
 to loop 288.

00:48:45.680 --> 00:48:49.320
 So they would connect to that water line for their initial phases.

00:48:49.320 --> 00:48:55.040
 And then in the future in the city's capital plan, we have another transmission line that's

00:48:55.040 --> 00:48:57.040
 proposed to go across the property.

00:48:57.040 --> 00:49:01.040
 We've been working with them to provide easements for that line.

00:49:01.040 --> 00:49:05.080
 And then they would connect to that line for future phases of the development.

00:49:05.080 --> 00:49:09.960
 Because of the number of units for this too, it requires an elevated storage tank, which

00:49:09.960 --> 00:49:13.120
 the developer would construct at their cost.

00:49:13.120 --> 00:49:16.920
 And then the city would maintain that infrastructure after it's created.

00:49:16.920 --> 00:49:22.880
 On the wastewater side, the developer would install a sewer line down to a planned Clear

00:49:22.880 --> 00:49:29.240
 Creek interceptor that the city has, and the city would maintain the wastewater infrastructure

00:49:29.240 --> 00:49:31.280
 following the installation.

00:49:31.280 --> 00:49:36.880
 On the roadway side, the developer would construct the roadways within the project and the city

00:49:36.880 --> 00:49:43.520
 would maintain those roadways after construction, except for the fact that the district would

00:49:43.520 --> 00:49:46.960
 maintain the landscaping within those roadways.

00:49:46.960 --> 00:49:53.280
 The roadways surrounding the property are owned by TxDOT or Denton County.

00:49:53.280 --> 00:49:57.840
 But the developer would have to do traffic impacts analysis to determine the capacity

00:49:57.840 --> 00:50:05.560
 of those roadways and the initial travel demand model appears to have the capacity to support

00:50:05.560 --> 00:50:11.400
 the development, but they would do TIAs with each phase of development and make a determination

00:50:11.400 --> 00:50:15.680
 on if any additional improvements are required.

00:50:15.680 --> 00:50:21.360
 For drainage, the developer is required to install drainage infrastructure.

00:50:21.360 --> 00:50:25.080
 So they would have drainage infrastructure within the roadways, and then they would also

00:50:25.080 --> 00:50:28.880
 have detention and drainage that they would need on site.

00:50:28.880 --> 00:50:34.480
 The city would maintain the drainage infrastructure within the right-of-way.

00:50:34.480 --> 00:50:39.520
 You can see here a little more in detail about what the water and wastewater projects are.

00:50:39.520 --> 00:50:45.280
 So here in this top picture, you can see the 60-inch water line that's being proposed from

00:50:45.280 --> 00:50:50.600
 the water treatment plants that would cross the property, and then that elevated storage

00:50:50.600 --> 00:50:54.360
 tank is proposed on the west portion of the property.

00:50:54.360 --> 00:50:59.800
 On the wastewater side, the city is already have plans and design for this Clear Creek

00:50:59.800 --> 00:51:00.800
 Interceptor.

00:51:00.800 --> 00:51:03.280
 I'm sorry, this is the lower picture.

00:51:03.280 --> 00:51:08.640
 The city is in design on this Clear Creek Interceptor and has a proposed treatment plant

00:51:08.640 --> 00:51:14.840
 at Clear Creek, and so the developer would construct wastewater facilities from the project

00:51:14.840 --> 00:51:24.180
 site up here into the north down to that Clear Creek Interceptor.

00:51:24.180 --> 00:51:30.720
 On the park side, so the development is required under the Parksland Dedication Ordinance to

00:51:30.720 --> 00:51:38.600
 dedicate 67 acres of parkland, but in total, they're proposing to have 380 acres of park

00:51:38.600 --> 00:51:41.320
 space within the development.

00:51:41.320 --> 00:51:48.440
 A large portion of that is within the central park, so it's a 358-acre central park.

00:51:48.440 --> 00:51:53.800
 And then there's an additional city park on the western portion of the property, and then

00:51:53.800 --> 00:51:58.000
 you can see here in yellow the three neighborhood parks that are being proposed.

00:51:58.000 --> 00:52:04.600
 Also, they're proposing to include 13.5 miles of trail systems and 18.5 miles of shared

00:52:04.600 --> 00:52:09.040
 use paths along the roadways.

00:52:09.040 --> 00:52:15.240
 Not shown on this is additional amenities, including pocket parks and private HOA amenities

00:52:15.240 --> 00:52:17.360
 that would be included as well.

00:52:17.360 --> 00:52:23.440
 I will mention that in total, they'll meet the city's 10-minute walk goal by having different

00:52:23.440 --> 00:52:27.980
 park systems throughout the entire site.

00:52:27.980 --> 00:52:32.400
 On the park side, the developer is required to construct and maintain all of the park

00:52:32.400 --> 00:52:33.400
 systems.

00:52:33.400 --> 00:52:37.720
 So the mowing the grass in the parks, the maintaining the landscaping within the parks,

00:52:37.720 --> 00:52:43.400
 that would be all funded through the development and not a cost to the city.

00:52:43.400 --> 00:52:50.120
 On the central park itself, in total, it's 358 acres, 338 of that is within a flowage

00:52:50.120 --> 00:52:51.120
 easement.

00:52:51.120 --> 00:52:55.800
 The flowage easement is for the release of the dam at Lake Ray Roberts.

00:52:55.800 --> 00:53:01.440
 The U.S. Army Corps of Engineers has an easement through the property that restricts what can

00:53:01.440 --> 00:53:04.160
 be built within that.

00:53:04.160 --> 00:53:10.240
 And so the main point of that flowage easement is there's no habitable structures.

00:53:10.240 --> 00:53:15.360
 But there can be park amenities within there with approval by the Corps.

00:53:15.360 --> 00:53:20.680
 It's important to note that that's -- so a lot of this flowage easement is outside of

00:53:20.680 --> 00:53:22.140
 the 100-year floodplain.

00:53:22.140 --> 00:53:27.480
 So 181 acres of that is outside of what we typically consider floodplain.

00:53:27.480 --> 00:53:33.840
 So they have the ability also to work with the Corps of Engineers to reduce that.

00:53:33.840 --> 00:53:41.600
 But there will be a minimum of 250 acres within that central park.

00:53:41.600 --> 00:53:46.180
 This commission will see more detail on the zoning request as it comes forward in November.

00:53:46.180 --> 00:53:53.040
 But at a high level, they're proposing a moderate density residential with mixed use at key intersections

00:53:53.040 --> 00:53:58.080
 throughout the development that you can see here in the different shading on the map.

00:53:58.080 --> 00:54:02.160
 They're also proposing to generally follow the development code with some additional deviations

00:54:02.160 --> 00:54:06.440
 and enhancements that include standards for zero lot line homes.

00:54:06.440 --> 00:54:11.720
 They have an established mix of residential uses with maximum numbers and dimensions for

00:54:11.720 --> 00:54:16.520
 lot sizes that the developer will have in their presentation.

00:54:16.520 --> 00:54:21.680
 They also have established increases for landscaping, fencing, and building standards.

00:54:21.680 --> 00:54:27.240
 And they're providing for unique roadway cross-sections.

00:54:27.240 --> 00:54:31.600
 In addition to the zoning change, this commission will consider a comprehensive plan amendment

00:54:31.600 --> 00:54:33.600
 and mobility plan amendments.

00:54:33.600 --> 00:54:38.440
 So the comprehensive plan amendment is to change it from the agricultural use that it

00:54:38.440 --> 00:54:43.760
 received when it was annexed into the city to match the zoning that's being proposed.

00:54:43.760 --> 00:54:51.640
 And then the mobility plan amendment is to correct for a deviation on this portion of

00:54:51.640 --> 00:54:54.460
 the design that you can see here.

00:54:54.460 --> 00:55:00.840
 The original mobility plan amendment had this east-west roadway going through this large

00:55:00.840 --> 00:55:05.960
 floodplain area that would have required a large bridge expanse to cross it.

00:55:05.960 --> 00:55:11.400
 So the developer is proposing to move this roadway further south and then cross at a

00:55:11.400 --> 00:55:14.420
 different point of this floodplain.

00:55:14.420 --> 00:55:18.320
 In addition to that, the travel demand model that was done supports the ability to make

00:55:18.320 --> 00:55:22.200
 that change.

00:55:22.200 --> 00:55:25.040
 So overall, what are the benefits to the city?

00:55:25.040 --> 00:55:30.480
 In the agreements that we've negotiated, they would have funding contributions of $7.5 million

00:55:30.480 --> 00:55:37.600
 to the city that you can see here, $2.5 million for emergency services, $2 million for a public

00:55:37.600 --> 00:55:42.840
 works facility to be located near this area in the future, and then $3 million towards

00:55:42.840 --> 00:55:45.840
 the city's affordable housing program.

00:55:45.840 --> 00:55:52.340
 In total, land conveyance of 48.5 acres, so that would be six acres for fire stations,

00:55:52.340 --> 00:55:57.240
 and then 42.5 acres for parks outside of the flow of easement.

00:55:57.240 --> 00:56:01.920
 It's important to note here that the additional parks and trail systems would have a public

00:56:01.920 --> 00:56:07.820
 access easement, so while they would not be deeded over to the city, they would be publicly

00:56:07.820 --> 00:56:12.920
 accessible for anybody in the area to use.

00:56:12.920 --> 00:56:19.960
 And then also, I'll point out that they're doing 315 acres more than what's required

00:56:19.960 --> 00:56:22.000
 by the Parkland Dedication Ordinance.

00:56:22.000 --> 00:56:27.480
 Again, I mentioned that 13.5 miles of trails, they are providing for a right of way for

00:56:27.480 --> 00:56:31.400
 our water line, and then constructing the elevated storage tank.

00:56:31.400 --> 00:56:35.800
 Also, they're generally following the city's typical development process with those few

00:56:35.800 --> 00:56:39.260
 deviations that I mentioned on the zoning slide.

00:56:39.260 --> 00:56:44.520
 And then the economic benefits is they're providing 9,200 homes for the city, 1.2 million

00:56:44.520 --> 00:56:50.960
 square feet of commercial space, over $5 billion in assessed value at build out, and an approximate

00:56:50.960 --> 00:56:58.240
 $38 million in net revenue to the city over 40 years.

00:56:58.240 --> 00:57:03.080
 So next steps, the developer representative will come up and present, and then we'll have

00:57:03.080 --> 00:57:04.720
 an opportunity for questions.

00:57:04.720 --> 00:57:10.440
 But we're seeking this commission's feedback on this as the item moves forward.

00:57:10.440 --> 00:57:14.760
 This will come back before the board on November 19th for the Zoning Comprehensive and Mobility

00:57:14.760 --> 00:57:16.840
 Plan public hearings.

00:57:16.840 --> 00:57:21.680
 And then on December 2nd, city council will consider the agreements, and then the Zoning

00:57:21.680 --> 00:57:24.880
 Comprehensive Plan and Mobility Plan.

00:57:24.880 --> 00:57:31.800
 And with that, I'll let Alexa Knight come and go through their slides.

00:57:31.800 --> 00:57:37.360
 Good evening, Mr. Chairman, commissioners.

00:57:37.360 --> 00:57:38.480
 My name is Alexa Knight.

00:57:38.480 --> 00:57:44.420
 I'm with Dakey Law in representing Old Prosper Partners on this zoning case.

00:57:44.420 --> 00:57:46.280
 So thank you for your time this evening.

00:57:46.280 --> 00:57:51.400
 We know that it is valuable time, but this is a very large and complicated project which

00:57:51.400 --> 00:57:53.680
 has a lot of moving parts.

00:57:53.680 --> 00:57:59.880
 Charlie and I have been herding cats on both sides with regard to all the various pieces

00:57:59.880 --> 00:58:01.440
 associated with it.

00:58:01.440 --> 00:58:04.560
 So I'm going to give an overview, try not to repeat what Charlie has said because he's

00:58:04.560 --> 00:58:08.760
 done a very detailed report, but we do have the entire development team here.

00:58:08.760 --> 00:58:14.320
 So if you have specific questions on engineering, traffic, environmental, what have you, developer,

00:58:14.320 --> 00:58:17.640
 we've got somebody here to be able to answer those questions for you.

00:58:17.640 --> 00:58:24.960
 Okay, so this is a vicinity map and just shows the 2,500 acres which, as Charlie said, is

00:58:24.960 --> 00:58:27.080
 in the northern part of the city of Denton.

00:58:27.080 --> 00:58:34.520
 It is within the full purpose city limits, and it was annexed back in 2008 and 2009.

00:58:34.520 --> 00:58:39.020
 When it is fully built out, it's a $5.1 billion value project.

00:58:39.020 --> 00:58:44.400
 It's not small potatoes, it's something to be taken seriously for certain.

00:58:44.400 --> 00:58:49.440
 It's going to be like nothing else that you all have seen with regard to a well-planned

00:58:49.440 --> 00:58:51.040
 master plan community.

00:58:51.040 --> 00:58:55.760
 And what that means, it's building that fabric for that overall community.

00:58:55.760 --> 00:58:57.800
 It's creating a sense of place.

00:58:57.800 --> 00:59:02.240
 It's creating that sense of place where people may come in at entry level and be able to

00:59:02.240 --> 00:59:03.960
 move up and stay within the community.

00:59:03.960 --> 00:59:07.920
 It's not, you know, what we don't want people to do is to move away, right?

00:59:07.920 --> 00:59:11.880
 We want people to stay and remain in the community.

00:59:11.880 --> 00:59:15.480
 And some of the benefits of that is having a trail system.

00:59:15.480 --> 00:59:21.000
 We're heavy on public parks, open space, community centers, public schools, supporting retail

00:59:21.000 --> 00:59:23.600
 and fire and police stations.

00:59:23.600 --> 00:59:27.800
 Charlie pointed out the infrastructure, the roadway infrastructure that's around it.

00:59:27.800 --> 00:59:31.920
 You have what we believe will be the outer loop coming to the south of it.

00:59:31.920 --> 00:59:39.000
 And then we have 2164 on the west, I-35 even further west, and then 2153 on the east and

00:59:39.000 --> 00:59:41.560
 coming along the north side.

00:59:41.560 --> 00:59:50.880
 Along the southern side is Shepherd and Gribble Springs Road.

00:59:50.880 --> 00:59:54.320
 With regard to not repeating things, I do want to repeat these because they are worth

00:59:54.320 --> 00:59:57.240
 repeating.

00:59:57.240 --> 01:00:00.520
 These are the benefits for supporting this master plan community.

01:00:00.520 --> 01:00:05.180
 It is a benefit for the city and the surrounding community and the developer.

01:00:05.180 --> 01:00:06.680
 It's a win-win for everybody.

01:00:06.680 --> 01:00:11.120
 And why I say that for the community and for the City of Denton also is because with the

01:00:11.120 --> 01:00:17.520
 master plan community, we are able to do all the planning, majority of the planning up

01:00:17.520 --> 01:00:18.520
 front, right?

01:00:18.520 --> 01:00:22.080
 The City of Denton has a lot of requirements for a developer when they come in just for

01:00:22.080 --> 01:00:23.080
 a zoning case.

01:00:23.080 --> 01:00:26.280
 It's not like other municipalities where you just come in and ask for a zoning case.

01:00:26.280 --> 01:00:29.200
 There's a lot of due diligence up front.

01:00:29.200 --> 01:00:33.540
 And so because of that, we had a couple of community meetings.

01:00:33.540 --> 01:00:39.280
 Even though the surrounding acreage and neighbors are in the ETJ, we've invited them and we

01:00:39.280 --> 01:00:42.360
 had a good turnout for both meetings.

01:00:42.360 --> 01:00:44.680
 Not everybody was a repeat.

01:00:44.680 --> 01:00:49.480
 And so we were able to explain to them what a master plan community is, what would be

01:00:49.480 --> 01:00:50.780
 coming.

01:00:50.780 --> 01:00:54.400
 And so with an approval of a master plan community, you know what you're going to get.

01:00:54.400 --> 01:00:57.360
 The city knows what they're going to get for the next 20 years.

01:00:57.360 --> 01:01:01.120
 It's not piece milled, it's not cut up in a hundred different, you know, a hundred acre

01:01:01.120 --> 01:01:04.980
 parcels and you're, because that's difficult for a city, right?

01:01:04.980 --> 01:01:08.680
 Trying to weave that plan together that you want to see.

01:01:08.680 --> 01:01:12.880
 If you have the opportunity that a developer is able to spend the dollars to come in and

01:01:12.880 --> 01:01:17.720
 do all the due diligence up front and plan that community, you know, that's better for

01:01:17.720 --> 01:01:19.280
 the city also.

01:01:19.280 --> 01:01:21.580
 So that's what we define as smart growth.

01:01:21.580 --> 01:01:24.640
 The neighbors know what is being planned next door.

01:01:24.640 --> 01:01:30.920
 It's a well thought out and designed community with an HOA within heavy on the green space

01:01:30.920 --> 01:01:33.040
 and parkland and open space.

01:01:33.040 --> 01:01:40.880
 It has the, we'll be bringing in the, the utility service to the area and at build out,

01:01:40.880 --> 01:01:47.720
 we will be $5.1 billion in total assessed value, 1.2 billion in debt and tax revenue.

01:01:47.720 --> 01:01:54.480
 And at build out annually, it'll be a $30.3 million tax revenue for the city.

01:01:54.480 --> 01:02:01.360
 The funding contributions that the developer is doing on top of he escrowed close to $600,000

01:02:01.360 --> 01:02:07.480
 to pay for the city consultants to help analyze all of the agreements, all of the studies

01:02:07.480 --> 01:02:08.680
 and everything.

01:02:08.680 --> 01:02:16.440
 On top of that, there's seven and a half million in police and fire to me equates to two and

01:02:16.440 --> 01:02:20.400
 a half million for police and fire, two million for public works, but there'll be an offsite

01:02:20.400 --> 01:02:23.960
 facility, three million to affordable housing.

01:02:23.960 --> 01:02:27.280
 On top of that, there are land gifts.

01:02:27.280 --> 01:02:32.360
 So two fire stations, total of six acres, the city parkland again, the requirement is

01:02:32.360 --> 01:02:40.040
 only 67 acres, but the dedication would be just over 380, 13 and a half miles of trails

01:02:40.040 --> 01:02:43.400
 easement for water transmission line, elevated storage tank.

01:02:43.400 --> 01:02:45.560
 And this number is already outdated.

01:02:45.560 --> 01:02:48.920
 It's actually 16 million for an offsite wastewater improvements.

01:02:48.920 --> 01:02:54.720
 There are two trunk lines that come up to the south portion of the tract.

01:02:54.720 --> 01:02:55.840
 All right.

01:02:55.840 --> 01:02:56.840
 Planning and zoning.

01:02:56.840 --> 01:03:03.880
 So this is your bread and butter, your comprehensive plan, which was approved back in 2022.

01:03:03.880 --> 01:03:05.120
 This is a picture of that.

01:03:05.120 --> 01:03:07.720
 This yellow star represents where the property is.

01:03:07.720 --> 01:03:13.480
 As you can see, it's shown as ag and that's what it's been sitting on the books since

01:03:13.480 --> 01:03:15.720
 2008 and nine.

01:03:15.720 --> 01:03:20.640
 So in everything that's crosshatched, that's around it, that all represents ETJ.

01:03:20.640 --> 01:03:26.960
 So we are the northern portion of it.

01:03:26.960 --> 01:03:32.000
 Council member Beck had a question and concern last night that came up with regard to, you

01:03:32.000 --> 01:03:34.280
 know, the leapfrog development.

01:03:34.280 --> 01:03:39.760
 And what he was referring to was, you know, this piece right here, because the development

01:03:39.760 --> 01:03:41.840
 today to the city comes out to here.

01:03:41.840 --> 01:03:46.080
 So it was an interesting point, went home, did a little bit more due diligence on that,

01:03:46.080 --> 01:03:51.240
 pulled up the city GIS system and all this flow down here.

01:03:51.240 --> 01:03:54.680
 I mean, this is basically riddled with floodplain.

01:03:54.680 --> 01:04:01.400
 So with regard to the leapfrog, it's the existing edge of development today leaping over a bunch

01:04:01.400 --> 01:04:02.720
 of floodplain.

01:04:02.720 --> 01:04:05.720
 And then we are the next logical development area.

01:04:05.720 --> 01:04:12.520
 So the next 2500 acres up to the north.

01:04:12.520 --> 01:04:16.920
 So this is a slide that we showed to the neighbors and we explained everything that goes along

01:04:16.920 --> 01:04:18.560
 with zoning.

01:04:18.560 --> 01:04:22.340
 It is, again, just the tip of the iceberg here in the city of Denton and there's quite

01:04:22.340 --> 01:04:25.200
 a bit that goes along with it.

01:04:25.200 --> 01:04:29.800
 We had, as Charlie mentioned, the pre-application meeting a year ago.

01:04:29.800 --> 01:04:32.440
 We submitted a zoning application.

01:04:32.440 --> 01:04:38.400
 And then with that, obviously, because it's shown as ag and it's RR, it will be rezoning

01:04:38.400 --> 01:04:41.460
 to a PD, the comp plan has to be changed.

01:04:41.460 --> 01:04:42.640
 So we have a comp plan amendment.

01:04:42.640 --> 01:04:45.800
 We also have a thoroughfare plan amendment that I'll touch on.

01:04:45.800 --> 01:04:49.540
 We've done our traffic assessment, the TSC was approved.

01:04:49.540 --> 01:04:52.160
 We have the environmental assessment that was also approved.

01:04:52.160 --> 01:04:55.200
 And then we have two agreements, the project agreement and the operating agreement that

01:04:55.200 --> 01:04:59.000
 goes along with the deal and with the district.

01:04:59.000 --> 01:05:02.640
 That's not the last you'll see of us with each phase we come through.

01:05:02.640 --> 01:05:07.120
 Of course, we'll have the traffic, the drainage environment assessment and the civil engineering

01:05:07.120 --> 01:05:09.900
 and the final plat for each phase.

01:05:09.900 --> 01:05:15.440
 The zoning that's proposed there, we have low density with the R4 and then we have moderate

01:05:15.440 --> 01:05:17.320
 density of R7.

01:05:17.320 --> 01:05:19.160
 Then we have the neighborhood commercial.

01:05:19.160 --> 01:05:28.560
 And then along the more the greater arterials, we'll have the regional commercial.

01:05:28.560 --> 01:05:33.020
 The rooftops have to come first, then you have to have the commercial.

01:05:33.020 --> 01:05:37.640
 One for a good master plan community would like to have the commercial embedded into

01:05:37.640 --> 01:05:45.240
 the community so that you're not having to get in your car and drive to services.

01:05:45.240 --> 01:05:48.240
 All right.

01:05:48.240 --> 01:05:53.280
 This is our development plan, which again shows the different zoning categories here,

01:05:53.280 --> 01:05:54.280
 the R4 and R7.

01:05:54.280 --> 01:06:00.640
 It is a residential community and we have 26 phases in here.

01:06:00.640 --> 01:06:05.560
 We take for granted because we do this on a daily basis, but 2,500 acres is quite a

01:06:05.560 --> 01:06:11.920
 bit and that's again one of the things that we told the neighbors is you're looking at

01:06:11.920 --> 01:06:15.120
 a 20 year life as far as build out in here.

01:06:15.120 --> 01:06:18.800
 It's not like this is going to plunk down tomorrow and you're going to have 7,000 single

01:06:18.800 --> 01:06:20.720
 family rooftops out there.

01:06:20.720 --> 01:06:29.720
 The underwriting is about 400 homes per year and that of course depends on market demand.

01:06:29.720 --> 01:06:34.840
 One of the important things to note of a quality master plan community like this is it's providing

01:06:34.840 --> 01:06:40.600
 the fabric of land use within the community and it's creating that community.

01:06:40.600 --> 01:06:46.520
 It is adding to the City of Denton and everything that the City of Denton residents want in their

01:06:46.520 --> 01:06:47.520
 communities.

01:06:47.520 --> 01:06:54.480
 So that has to do with the trail system and the open parks and the open space and importantly

01:06:54.480 --> 01:06:57.160
 we want to provide a variety of residential products.

01:06:57.160 --> 01:07:00.120
 So that includes town homes and it includes the multi-family.

01:07:00.120 --> 01:07:02.760
 We have about 1,500 multi-family units.

01:07:02.760 --> 01:07:05.600
 We've set that cap on it.

01:07:05.600 --> 01:07:07.560
 That's about four multi-family deals.

01:07:07.560 --> 01:07:10.000
 Certainly wouldn't start off the bat.

01:07:10.000 --> 01:07:12.400
 It would start with single family homes.

01:07:12.400 --> 01:07:19.300
 We have the three school districts, two school districts, three schools.

01:07:19.300 --> 01:07:26.560
 We have the elementary shown down here for DISD, the middle school up here and then this

01:07:26.560 --> 01:07:30.000
 is the Sanger Elementary School over here.

01:07:30.000 --> 01:07:32.160
 The Central Park runs through here.

01:07:32.160 --> 01:07:36.920
 There's also a beautiful open space, that green space so it runs along the western side

01:07:36.920 --> 01:07:40.960
 of the property as well.

01:07:40.960 --> 01:07:44.160
 These are some of the architectural product types that you might see.

01:07:44.160 --> 01:07:49.760
 These represent 50, 60, and 70 foot wide lots.

01:07:49.760 --> 01:07:53.840
 These could represent the 40 foot wide lots.

01:07:53.840 --> 01:07:59.540
 This is a cottage product with a central esplanade.

01:07:59.540 --> 01:08:06.240
 As the project becomes more developed, this could be options for the different town homes

01:08:06.240 --> 01:08:10.560
 and live work components.

01:08:10.560 --> 01:08:14.320
 The commercial, this is a scale.

01:08:14.320 --> 01:08:19.600
 Again, as the project develops, this is some of the multi-family product that could be

01:08:19.600 --> 01:08:22.300
 envisioned for the project.

01:08:22.300 --> 01:08:30.560
 Those will be embedded in the MN zoning locations.

01:08:30.560 --> 01:08:36.040
 This is really the crown jewel for the project and that has to do with the parks.

01:08:36.040 --> 01:08:45.640
 We have over 483 acres of green space so that includes, the green space includes the open

01:08:45.640 --> 01:08:50.560
 space, the park land and it excludes any of the additional trails and the neighborhood

01:08:50.560 --> 01:08:53.040
 pocket parks that Charlie discussed.

01:08:53.040 --> 01:08:57.840
 We are meeting the requirement of the half mile radius of every home.

01:08:57.840 --> 01:09:03.000
 I think that's an excellent requirement within a community, especially one of this size.

01:09:03.000 --> 01:09:06.840
 We don't want people to spend a lot of time in their cars, like when they come home, let's

01:09:06.840 --> 01:09:13.320
 get out, let's get on to the shared bike paths, whether you're running or walking or riding

01:09:13.320 --> 01:09:17.560
 your bike, you can navigate your way through this community.

01:09:17.560 --> 01:09:22.480
 The dash line represents the 13 and a half miles of trail space.

01:09:22.480 --> 01:09:28.640
 I also shared with the community when we had the meetings, I used to run quite a bit and

01:09:28.640 --> 01:09:31.240
 run marathons and then got into trail running.

01:09:31.240 --> 01:09:37.920
 I live in the city of Dallas and I'd have to commute an hour to be able to find a trail

01:09:37.920 --> 01:09:38.920
 system.

01:09:38.920 --> 01:09:41.960
 To be able to have this sort of amenity in your backyard where you can get out on the

01:09:41.960 --> 01:09:48.680
 sidewalk and then go find a trail, that's a huge amenity.

01:09:48.680 --> 01:09:53.400
 We have identified on here the school sites in blue.

01:09:53.400 --> 01:09:57.280
 These represent the private amenity centers.

01:09:57.280 --> 01:10:02.000
 This is the over 102 acres of green space on the western side.

01:10:02.000 --> 01:10:06.800
 The eastern side, this is the 338 acre central park.

01:10:06.800 --> 01:10:14.040
 These green areas represent the public parks also, as do these smaller yellow, which is

01:10:14.040 --> 01:10:19.420
 about 12 acres total.

01:10:19.420 --> 01:10:24.640
 We had a couple meetings with the parks department and we really wanted to focus on the central

01:10:24.640 --> 01:10:29.400
 park area, and one of the things that, this was actually a slide that we used with the

01:10:29.400 --> 01:10:34.720
 neighbors because it's hard to envision what 338 acres is for the lay person, right?

01:10:34.720 --> 01:10:37.920
 That's the size of 256 football fields.

01:10:37.920 --> 01:10:39.800
 It's a huge area.

01:10:39.800 --> 01:10:45.280
 This picture is taken where the yellow star is located, so right in the center here.

01:10:45.280 --> 01:10:50.120
 I'll get to the thoroughfare plan amendment, but this is the reason why we're asking for

01:10:50.120 --> 01:10:55.080
 the thoroughfare plan amendment, is this beautiful central park area.

01:10:55.080 --> 01:11:00.040
 When we met with the parks department, they too were having difficulty understanding the

01:11:00.040 --> 01:11:04.960
 concept of the size and what you could really do with this acreage.

01:11:04.960 --> 01:11:06.620
 This is not the plan.

01:11:06.620 --> 01:11:12.300
 This is an exercise only to figure out, okay, well, what can we fit in there?

01:11:12.300 --> 01:11:15.680
 This is within that 20 acres of uplands area.

01:11:15.680 --> 01:11:18.440
 One of the things that was very important for the parks department was to have a rec

01:11:18.440 --> 01:11:23.320
 center up here, the ability to have one, and that's a 60,000 square foot building.

01:11:23.320 --> 01:11:27.680
 That too is not very small, and that's what's represented right here, plenty of area for

01:11:27.680 --> 01:11:35.280
 parking around it, but that way you have ball fields here, soccer fields, amphitheater over

01:11:35.280 --> 01:11:40.640
 here, other parking, trail systems all through along here, trail heads.

01:11:40.640 --> 01:11:47.680
 This is a plan that satisfied the parks department that in the future that we could work together

01:11:47.680 --> 01:11:52.600
 when we plan out each phase, lot out each phase, that we can then take this to the parks

01:11:52.600 --> 01:11:57.600
 board, they would take this to the parks board with regard to a plan specific to that park

01:11:57.600 --> 01:11:58.600
 area.

01:11:58.600 --> 01:12:05.800
 These are examples that we showed the community with regard to trail heads, and this represents

01:12:05.800 --> 01:12:12.280
 the half mile radius around each home, and we certainly meet that, and with regard to

01:12:12.280 --> 01:12:18.560
 the active and passive different amenities that could be envisioned within the overall

01:12:18.560 --> 01:12:21.400
 project.

01:12:21.400 --> 01:12:26.720
 This is the mobility plan and the thoroughfare plan that would come before you.

01:12:26.720 --> 01:12:31.240
 What's in the upper left hand corner there represents that is your thoroughfare plan,

01:12:31.240 --> 01:12:36.400
 and so it's a nicely gridded out H of arterials.

01:12:36.400 --> 01:12:40.440
 Well unfortunately that H goes right through that central park, right through that pond

01:12:40.440 --> 01:12:42.440
 at the widest point.

01:12:42.440 --> 01:12:46.480
 From an environmental perspective, you don't want that.

01:12:46.480 --> 01:12:48.800
 From a land planning perspective, you don't want that.

01:12:48.800 --> 01:12:53.760
 So you want something that's a little softer, more curvilinear, slows traffic down, so that's

01:12:53.760 --> 01:12:59.080
 why this road is the way it is, and this orange piece here is the portion that's outside the

01:12:59.080 --> 01:13:06.520
 1,000 foot buffer that the city code allows you to move the roadways, and so that is the

01:13:06.520 --> 01:13:11.040
 portion that would need a variance, and city staff is supporting that.

01:13:11.040 --> 01:13:18.640
 We run our TTIA in addition to a TDM associated with all the trips out here, and this does

01:13:18.640 --> 01:13:23.160
 not cause any problem with those.

01:13:23.160 --> 01:13:26.080
 These are the typical cross sections.

01:13:26.080 --> 01:13:31.480
 The biggest thing I want to show this group of course is the 10 foot shared use pathways

01:13:31.480 --> 01:13:35.800
 that we have in both of these roadway cross sections.

01:13:35.800 --> 01:13:43.640
 You'll also notice that on the 65 foot right of way on the collector sections, that 10

01:13:43.640 --> 01:13:48.680
 foot shared path actually goes outside of the right of way, so we are adding to the

01:13:48.680 --> 01:13:49.680
 right of way.

01:13:49.680 --> 01:13:54.680
 So we have 65 feet of right of way, but then we're adding a 10 foot landscape buffer outside

01:13:54.680 --> 01:13:58.760
 of that that would be covered under an easement, and what that allows is you don't have to

01:13:58.760 --> 01:14:03.200
 crowd everything, you don't have to crowd that 10 foot shared path way in your right

01:14:03.200 --> 01:14:07.900
 of way, but it allows us to meander around trees as we go out there and we do the planning

01:14:07.900 --> 01:14:15.160
 of each one of the phases, and it's wide enough for everybody to bike, run, walk, and utilize

01:14:15.160 --> 01:14:19.080
 those throughout the project.

01:14:19.080 --> 01:14:24.040
 And finally I'm going to hit this again, the benefit of this master plan community, I mean

01:14:24.040 --> 01:14:27.560
 it's really going to be something excellent.

01:14:27.560 --> 01:14:32.680
 It is smart growth, it is something good for the city because you all know exactly what

01:14:32.680 --> 01:14:34.000
 you're getting.

01:14:34.000 --> 01:14:38.760
 And again it's a 20 year build out, you don't have to look at 25 different applications

01:14:38.760 --> 01:14:48.440
 and try to dovetail that into something that you want to see as part of your comp plan.

01:14:48.440 --> 01:14:56.040
 Again at build out you've got $5.1 billion of total assessed value, and then $30.3 million

01:14:56.040 --> 01:14:58.720
 annually coming in to the city.

01:14:58.720 --> 01:15:05.400
 Gifting contributions, $7.5 million, and then for the city we're gifting these land areas

01:15:05.400 --> 01:15:10.560
 again 67 acres of that should be only what's required for parkland, but we're giving over

01:15:10.560 --> 01:15:16.720
 380 acres, 13.5 miles of trails, 6 acres for the fire and police stations, those would

01:15:16.720 --> 01:15:23.400
 be joint facilities, and $16 million with offsite utilities.

01:15:23.400 --> 01:15:27.600
 So with that we're here to answer any questions that you may all have.

01:15:27.600 --> 01:15:30.000
 Thank you.

01:15:30.000 --> 01:15:31.000
 Questions?

01:15:31.000 --> 01:15:32.000
 Commissioner Riggs.

01:15:32.000 --> 01:15:36.440
 So I just want full disclosure, the firm I work for is helping out with the traffic impact

01:15:36.440 --> 01:15:40.280
 analysis on this, and so I don't feel like I need to get up and leave the room since

01:15:40.280 --> 01:15:46.720
 we're not voting on anything tonight, but I'm just not going to have any comments.

01:15:46.720 --> 01:15:49.720
 Thank you.

01:15:49.720 --> 01:15:52.560
 Commissioner McDade?

01:15:52.560 --> 01:15:59.840
 This is a whole lot, but I was wondering on the 3 million that you were, you're donating

01:15:59.840 --> 01:16:06.400
 $3 million to the city for affordable housing, or will you have affordable housing in your

01:16:06.400 --> 01:16:07.400
 plans?

01:16:07.400 --> 01:16:13.280
 It's a donation to the city affordable housing fund so that you can use it as you see fit.

01:16:13.280 --> 01:16:15.400
 But you will have multifamily out there?

01:16:15.400 --> 01:16:22.840
 Yes, ma'am, in addition to town home product, yes.

01:16:22.840 --> 01:16:23.840
 Commissioner McDuff?

01:16:23.840 --> 01:16:28.640
 Well, I agree with Commissioner McDate, it's a lot, it's about everything I can see except

01:16:28.640 --> 01:16:33.640
 a Nordstrom's and a bigger Dillard's, and if it had that I'd be glad.

01:16:33.640 --> 01:16:40.880
 But I will say that just again commenting, Chair Pruitt, on our thread that we've been

01:16:40.880 --> 01:16:52.800
 talking about, and that is the tiny homes and the different types of houses and different

01:16:52.800 --> 01:16:58.720
 models and a thread throughout our discussion since I've been on the commission, and the

01:16:58.720 --> 01:17:07.960
 need for more town homes and not so many multifamily builds.

01:17:07.960 --> 01:17:15.960
 Many of our citizens feel like we have enough multifamily builds, and it's time to focus

01:17:15.960 --> 01:17:24.520
 down and get a townhouse, so I'm just sharing that, that we might, instead of 15, 15 multifamily

01:17:24.520 --> 01:17:33.160
 units, we might come a little closer and have some more town homes, a few more than 584.

01:17:33.160 --> 01:17:34.160
 Thank you for that.

01:17:34.160 --> 01:17:41.240
 Commissioner Meyer?

01:17:41.240 --> 01:17:48.000
 I would like to second Commissioner McDuff's thoughts as well, because that was one of

01:17:48.000 --> 01:17:49.940
 the things I noticed.

01:17:49.940 --> 01:17:56.320
 1,500 multifamily units is a lot, especially when we hear from the citizens that they're

01:17:56.320 --> 01:18:01.400
 tired of apartments, and I think currently, even though we don't have numbers, it seems

01:18:01.400 --> 01:18:06.840
 like there are a lot of empty apartment units now, and I know we can't predict the future

01:18:06.840 --> 01:18:10.560
 on what's happening and what the needs of the community are going to be, especially

01:18:10.560 --> 01:18:18.280
 when you're looking at a 17-year build timeframe.

01:18:18.280 --> 01:18:24.440
 But definitely, you hear, not only in North Texas, not only in Denton County, but even

01:18:24.440 --> 01:18:31.120
 throughout the United States, that our younger generation, and I bought my first house when

01:18:31.120 --> 01:18:33.560
 I was 20.

01:18:33.560 --> 01:18:42.320
 And I know that's odd, that's not the norm, but that was in 1992 when I paid like $34,000

01:18:42.320 --> 01:18:43.320
 for a house.

01:18:43.320 --> 01:18:45.600
 Now, granted, I didn't.

01:18:45.600 --> 01:18:53.040
 My ex-husband and I, we were one income family and only made like $25,000 a year with a kid,

01:18:53.040 --> 01:18:55.720
 but that's what it was back then.

01:18:55.720 --> 01:19:02.320
 We're trying to figure out a way to work with the home builders,

01:19:02.320 --> 01:19:08.280
 because I've sat in the industry that I work in, I've sat in enough meetings and

01:19:08.280 --> 01:19:13.120
 discussions that part of the problem with the cost of housing

01:19:13.120 --> 01:19:17.360
 that's gone up is because the cost of land is going up.

01:19:17.360 --> 01:19:22.320
 And so trying to figure out a way where cities and developers and

01:19:22.320 --> 01:19:31.280
 builders can work to have affordable housing where our younger generation.

01:19:31.280 --> 01:19:35.360
 because this is really going to be the kids in elementary school.

01:19:35.360 --> 01:19:37.680
 This is going to be your first time home buyers.

01:19:37.680 --> 01:19:44.160
 So we're really looking at these kids that don't even know they're going to build a house.

01:19:44.160 --> 01:19:49.160
 And making sure that when they hit their 20s and 30s, that there is something that they can build.

01:19:49.160 --> 01:19:56.040
 And that they're not just having to get an apartment, because that's the only thing they can afford.

01:19:56.040 --> 01:20:00.560
 I'm not a huge fan of the zero lot line personally,

01:20:00.560 --> 01:20:04.720
 just because then you look out into a sea of rooftops.

01:20:04.720 --> 01:20:11.280
 So again, it's finding that balance of making sure that you are,

01:20:11.280 --> 01:20:18.240
 a developer's making the money on their return, because there is that aspect of it.

01:20:18.240 --> 01:20:21.160
 But also making sure that people can afford it.

01:20:21.160 --> 01:20:27.240
 I noticed that, I know it has the Denton County outer loop,

01:20:27.240 --> 01:20:33.280
 but it's in the maps here, it's being called the proposed regional outer loop.

01:20:33.280 --> 01:20:36.560
 Are we for sure that's where the location is going to be?

01:20:36.560 --> 01:20:41.040
 And it's not going to interfere with this development.

01:20:41.040 --> 01:20:45.280
 And that when you're building some of these houses, you're not going to be,

01:20:47.280 --> 01:20:49.680
 their backyards aren't going to be looking at.

01:20:49.680 --> 01:20:54.200
 >> So we have our traffic engineer here and she can speak to that, but no, we are not for sure.

01:20:54.200 --> 01:20:56.200
 No one is for certain where the alignments are.

01:20:56.200 --> 01:20:57.400
 >> Where it's going to end up at?

01:20:57.400 --> 01:21:02.560
 >> Right, this is a slide that Wes would put together that shows the options for the loop.

01:21:02.560 --> 01:21:11.880
 But we feel strongly that it'll probably be on the southern route, but no one knows 100%.

01:21:11.880 --> 01:21:15.680
 >> So A could go right through the middle of it, is that what I'm seeing?

01:21:15.680 --> 01:21:17.440
 >> Correct.

01:21:17.440 --> 01:21:19.880
 >> I have not seen an exact alignment on that.

01:21:19.880 --> 01:21:21.360
 This is still a feasibility.

01:21:21.360 --> 01:21:24.360
 >> Yeah, sorry, if you could come to the mic, please.

01:21:24.360 --> 01:21:34.560
 >> So when, I guess I need to get closer to the mic.

01:21:34.560 --> 01:21:37.120
 All right, so this is still in the feasibility stage.

01:21:37.120 --> 01:21:43.360
 Once it passes the feasibility stage, that's when they select the alignment and then go into schematic.

01:21:43.360 --> 01:21:48.960
 I have not seen exactly where that A is because it's a broad range.

01:21:48.960 --> 01:21:53.640
 Like even when they're looking at it, it's not like, oh, this is our 200 foot section.

01:21:53.640 --> 01:21:55.840
 They're looking at a five to 1,000 foot section.

01:21:55.840 --> 01:21:59.560
 It's kind of a massive location.

01:21:59.560 --> 01:22:11.240
 >> So when you're looking at the phases, like on slide five, when you're comparing it to this map, if, depending on the route,

01:22:11.240 --> 01:22:16.000
 that could be like phase 15, phase 13, 14, 9.

01:22:16.000 --> 01:22:24.760
 Does that mean that if TechStat decides that's the route that you're going to be working as a developer,

01:22:24.760 --> 01:22:29.800
 working with the city and might have to reconfigure what that could potentially look like?

01:22:29.800 --> 01:22:34.320
 >> Potentially, but once a route's selected, they go to schematic phase.

01:22:34.320 --> 01:22:42.840
 During the schematic phase, the engineers work with the developments alongside the city and things get changed.

01:22:42.840 --> 01:22:51.240
 From experience, the state loop 288 alignment was changed several times to avoid the developments that were in there.

01:22:51.240 --> 01:22:54.080
 >> And my next question, I think this is my final one.

01:22:54.080 --> 01:22:58.880
 This might be a question for city staff as well as kind of for the developer.

01:22:58.880 --> 01:23:04.640
 We're looking at 15,000 homes between Hunter and Coal Ranch and

01:23:04.640 --> 01:23:10.360
 now another potential 9,100, almost 9,200 units here in Craver.

01:23:10.360 --> 01:23:18.440
 Are we projecting that the growth, I mean I know we grow by about 100 people a day in Denton County.

01:23:18.440 --> 01:23:27.920
 But are we looking that we're going to be able to sustain three large developments between Landmark, Coal Ranch, and now Craver?

01:23:28.960 --> 01:23:37.560
 >> Yeah, so this area was identified as part of the future comprehensive plan.

01:23:37.560 --> 01:23:42.480
 This is an area within the city, so with regard to the housing, then yes,

01:23:42.480 --> 01:23:46.920
 it was contemplated that this area would develop in the future.

01:23:46.920 --> 01:23:53.080
 And then I will also add to that there's some additional

01:23:53.080 --> 01:23:57.520
 pressure from development external to the city too that we have along with the muds and stuff.

01:23:57.520 --> 01:24:03.640
 So we are bringing an update to the comprehensive plan amendment in the next couple of years and

01:24:03.640 --> 01:24:06.440
 we'll be looking at all of that information again as well.

01:24:06.440 --> 01:24:10.200
 >> You mean external, like the developers are demanding, like we need more space, like?

01:24:10.200 --> 01:24:13.440
 >> No, no, like external, outside of city limits.

01:24:13.440 --> 01:24:18.600
 We've got areas in Denton County that are on our periphery that are developing as well.

01:24:18.600 --> 01:24:19.560
 >> Okay, thank you.

01:24:19.560 --> 01:24:20.060
 >> Mm-hm.

01:24:23.760 --> 01:24:28.720
 >> I'd also want to add, with regard to this community, a couple things.

01:24:28.720 --> 01:24:34.600
 So creating that fabric that I talked about in the sense of place is providing also the different product types.

01:24:34.600 --> 01:24:40.840
 So the 1,500 multifamily units, while it may sound like a lot of units, that really is only four deals.

01:24:40.840 --> 01:24:47.640
 And over the 2,500 acres and the different MN zones here, which is where that multifamily would go.

01:24:47.640 --> 01:24:51.160
 That's the reason why we chose that.

01:24:51.160 --> 01:24:56.400
 I mean, it could have been a lot, I mean, a lot of deals you come in and it's a heck of a lot larger.

01:24:56.400 --> 01:25:01.840
 And so having all those different product types was important for us to have in the community.

01:25:01.840 --> 01:25:06.800
 With regard to looking at, one of the things I discussed last night with council is,

01:25:06.800 --> 01:25:10.920
 let's look at the macro here in the United States of what's happening.

01:25:10.920 --> 01:25:15.040
 And if you look at the coasts of west and the east coast, while some of those states are wonderful and

01:25:15.040 --> 01:25:19.160
 sure to live in, they're very expensive, and the land is very expensive.

01:25:19.160 --> 01:25:22.040
 It's expensive to do business, it's expensive to live.

01:25:22.040 --> 01:25:27.080
 So we have been seeing and experiencing here in Texas that influx of people.

01:25:27.080 --> 01:25:30.600
 And North Denton is, I mean, it's coming.

01:25:30.600 --> 01:25:36.840
 So to support the other two master plan communities and this one, they're in different regions,

01:25:36.840 --> 01:25:39.640
 there are different reasons why that each would succeed.

01:25:39.640 --> 01:25:45.280
 But again, we're underwriting 400 units a year, it's not a bajillion units either.

01:25:45.280 --> 01:25:49.240
 So as with any sort of development, they complement one another and

01:25:49.240 --> 01:25:52.600
 the reasons why you may want to live in one and I might want to live in another.

01:25:52.600 --> 01:26:00.240
 >> Excuse me, my name is Jim Knight, my company is the engineer for the project.

01:26:00.240 --> 01:26:01.760
 I wanted to add a couple things to help.

01:26:01.760 --> 01:26:07.680
 We, and Jennifer addressed this appropriately on that proposed outer loop alignment.

01:26:07.680 --> 01:26:12.600
 What we do know is that the crossing at I-35 is at Milam Road.

01:26:12.600 --> 01:26:17.720
 The crossing at Milam Road does not allow the path to go north of where we have it

01:26:17.720 --> 01:26:21.360
 shown on the map, so we know for a fact where it's gonna cross.

01:26:21.360 --> 01:26:24.720
 Now, it's just the geometry that lays it out there.

01:26:24.720 --> 01:26:28.040
 The other thing I would suggest on the multifamily, and Mrs.

01:26:28.040 --> 01:26:31.280
 Knight is correct, is our current performer,

01:26:31.280 --> 01:26:34.600
 we don't show any multifamily in here being delivered for ten years.

01:26:34.600 --> 01:26:39.760
 I mean, she addressed it earlier in presentation, this is against a single

01:26:39.760 --> 01:26:44.760
 family driven, but we need the breadth of product to be able to keep it a vibrant and

01:26:44.760 --> 01:26:46.680
 fabric driven community.

01:26:46.680 --> 01:26:49.180
 Thank you.

01:26:49.180 --> 01:26:59.720
 >> Other questions, Commissioner Ketchersid, is that appropriate?

01:26:59.720 --> 01:27:02.200
 I'm sorry, this is our first meeting together, so.

01:27:02.200 --> 01:27:03.360
 >> No, Ketchersid is right.

01:27:03.360 --> 01:27:04.600
 >> Very good.

01:27:04.600 --> 01:27:13.800
 So, my question is, you had said that there's a lot of green space.

01:27:13.800 --> 01:27:18.560
 Where it's at, how is that going to stay green?

01:27:18.560 --> 01:27:20.640
 Like, where's the water gonna come from?

01:27:20.640 --> 01:27:26.600
 >> As far as where's the water gonna come from,

01:27:26.600 --> 01:27:28.880
 can you explain a little bit more what you mean there?

01:27:28.880 --> 01:27:33.080
 >> Well, there's a lot of parks, right?

01:27:33.080 --> 01:27:38.320
 So we're gonna have to water the grass,

01:27:38.320 --> 01:27:41.080
 keep those things green for it to be green space.

01:27:41.080 --> 01:27:42.080
 >> I understand.

01:27:42.080 --> 01:27:46.320
 Yeah, so the development is proposing to have wells that would

01:27:46.320 --> 01:27:48.920
 be used for irrigation only on the property.

01:27:48.920 --> 01:27:51.480
 >> Very good, thank you.

01:27:51.480 --> 01:27:56.760
 >> Yeah, and we do have the option in our agreements to have reclaimed water.

01:27:56.760 --> 01:27:59.680
 So part of the, thank you for that, Alexa.

01:27:59.680 --> 01:28:04.640
 So part of the strategy for water utility team is when we're constructing or

01:28:04.640 --> 01:28:08.800
 making improvements to our current treatment plants.

01:28:08.800 --> 01:28:15.320
 That we would allow for purple pipe or to be reclaimed water to be used for irrigation.

01:28:15.320 --> 01:28:21.360
 So the long term plan for the city is that we would, at the treatment plants,

01:28:21.360 --> 01:28:27.720
 run pipe back up to allow that water to be used for irrigation.

01:28:29.760 --> 01:28:30.600
 >> Very good, thank you.

01:28:30.600 --> 01:28:42.880
 >> I got a couple, you mentioned that the perimeter streets

01:28:42.880 --> 01:28:47.800
 that are on the border between city and county land.

01:28:47.800 --> 01:28:54.480
 The reason I wanna poke at this is just that we've had situations in our southern

01:28:54.480 --> 01:28:59.240
 border where nobody really knew who was gonna

01:28:59.240 --> 01:29:03.640
 maintain the street and it went for decades without being maintained at all.

01:29:03.640 --> 01:29:06.160
 Obviously, this would have a lot more eyes on it and

01:29:06.160 --> 01:29:08.520
 there's a developer agreement and that sort of thing.

01:29:08.520 --> 01:29:14.920
 Has that been talked about with the county yet or is that still in flux?

01:29:14.920 --> 01:29:18.440
 >> Yeah, so we've actually been talking with the developer about this.

01:29:18.440 --> 01:29:22.840
 What would happen on at least the county's portion of roadways adjacent to

01:29:22.840 --> 01:29:27.120
 the property is the developer would construct improvements adjacent to

01:29:27.120 --> 01:29:32.040
 the property to the textile roadways to the west and east of the property.

01:29:32.040 --> 01:29:37.120
 The traffic demand modeling shows just a few hundred trips in between those

01:29:37.120 --> 01:29:42.360
 sections, so the improvements would be limited to the areas adjacent to

01:29:42.360 --> 01:29:46.400
 the property and to the east and west to 2153 and 2164.

01:29:46.400 --> 01:29:49.640
 >> Okay, but they're both textile roadways, they're not county roads.

01:29:49.640 --> 01:29:53.760
 >> Yeah, just the southern boundary is a county road, so

01:29:53.760 --> 01:29:55.840
 it's Gribble Springs and Shepherd Road here.

01:29:55.840 --> 01:29:57.360
 >> Okay, thank you.

01:29:57.360 --> 01:30:01.680
 If you could go back to your infrastructure slide.

01:30:01.680 --> 01:30:05.200
 We had all the bullets of, yes, perfect.

01:30:05.200 --> 01:30:12.580
 Just so that we can all learn how this is different or the same as, I think,

01:30:12.580 --> 01:30:18.000
 one of the, like a county mud municipal utility district that you mentioned.

01:30:18.000 --> 01:30:21.920
 Could you briefly cover how this would be different

01:30:21.920 --> 01:30:25.760
 if in 2008 this land was not annexed?

01:30:25.760 --> 01:30:31.280
 And we were sitting here learning about a county mud proposal that was in the ETJ.

01:30:31.280 --> 01:30:37.400
 >> Yeah, I think the biggest difference would be property tax collection.

01:30:37.400 --> 01:30:39.000
 So that's the obvious one.

01:30:39.000 --> 01:30:41.400
 So the fact that this is in the city limits,

01:30:41.400 --> 01:30:46.080
 it would be subject to the city property tax and that's a revenue source for us.

01:30:46.080 --> 01:30:50.080
 This is within our certificate of convenience and necessity.

01:30:50.080 --> 01:30:55.960
 So that means that the city has an obligation to provide water and

01:30:55.960 --> 01:30:58.400
 wastewater service to the area.

01:30:58.400 --> 01:31:07.040
 So what we've been doing with municipal utility districts in the recent past is

01:31:07.040 --> 01:31:13.040
 that one of our goals as a city is to promote regionalism and

01:31:13.040 --> 01:31:21.200
 to prevent the use of groundwater for developments to use for their potable water.

01:31:21.200 --> 01:31:28.200
 And so one of our strategies is to work with communities that are going to develop on

01:31:28.200 --> 01:31:34.000
 the edge of our city limits to get into agreements with them so

01:31:34.000 --> 01:31:37.840
 that we can have them use city services where it's applicable.

01:31:37.840 --> 01:31:43.880
 So in the instance of this, where it's different is they're helping to construct

01:31:43.880 --> 01:31:46.800
 some of the infrastructure to get there.

01:31:46.800 --> 01:31:51.520
 But other than that, the larger difference is the fact that they're part of the city.

01:31:51.520 --> 01:31:53.880
 There'll be a fabric of the city of Denton in the future and

01:31:53.880 --> 01:31:55.880
 that we collect property tax from it.

01:31:55.880 --> 01:32:03.120
 >> Okay, and am I correct in imagining that maybe it's different with different

01:32:03.120 --> 01:32:08.400
 developer agreements, but in that case, the waterline, for instance,

01:32:08.400 --> 01:32:13.240
 would be the developer's responsibility to build out to the property,

01:32:13.240 --> 01:32:14.120
 to the subject property?

01:32:14.120 --> 01:32:17.600
 >> So it depends.

01:32:17.600 --> 01:32:23.480
 So the responsibility of the developer is if it's in the city's impact fee

01:32:23.480 --> 01:32:27.800
 schedule, then if they construct improvements on that schedule,

01:32:27.800 --> 01:32:30.520
 then it would be eligible for impact fee credits.

01:32:30.520 --> 01:32:36.240
 If it wasn't something that the city plans to build, then it wouldn't be.

01:32:36.240 --> 01:32:41.440
 >> Okay, and then when you say, obviously we wouldn't get city tax revenue,

01:32:41.440 --> 01:32:46.040
 the roadways and drainage, that would not be the city's liability for

01:32:46.040 --> 01:32:49.160
 maintenance and replacement as well, right?

01:32:49.160 --> 01:32:54.800
 >> Yeah, it would be cut, well, mostly in the mud districts, then the municipal

01:32:54.800 --> 01:32:58.920
 utility district itself would fund the maintenance of the drainage and

01:32:58.920 --> 01:32:59.960
 roadway infrastructure.

01:32:59.960 --> 01:33:02.800
 >> Thank you.

01:33:02.800 --> 01:33:11.400
 The, okay, a couple comments concerning the comp plan.

01:33:11.400 --> 01:33:16.720
 I appreciate your comments on what you view as smart growth and

01:33:16.720 --> 01:33:17.880
 leapfrog development.

01:33:17.880 --> 01:33:24.080
 All the conversations I've seen here at PNZ and

01:33:24.080 --> 01:33:29.040
 council in the last ten years have been about how we don't want leapfrog

01:33:29.040 --> 01:33:38.560
 development and therefore we try to make sure that we're allowing development

01:33:38.560 --> 01:33:42.880
 closer to town, has that policy changed?

01:33:42.880 --> 01:33:48.000
 >> No, I don't think the policy has changed.

01:33:48.000 --> 01:33:52.640
 I think this one is different in the instance that this was annexed as part of

01:33:52.640 --> 01:33:55.680
 the city and intended to be developed in the future.

01:33:55.680 --> 01:34:01.480
 There's the area that's within the southern portion north of the city,

01:34:01.480 --> 01:34:06.400
 that area in the ETJ, but the city in 2008, 2009 took action

01:34:06.400 --> 01:34:10.040
 specifically to annex this portion of the city with the intent that it was going to

01:34:10.040 --> 01:34:11.520
 develop in the future.

01:34:11.520 --> 01:34:17.440
 >> Okay, and sorry.

01:34:17.440 --> 01:34:20.520
 >> And I'll just, if I can, I'll just add a little bit more.

01:34:20.520 --> 01:34:25.760
 Even in the infrastructure portion, with the improvements to the Lake Ray Roberts

01:34:25.760 --> 01:34:29.320
 treatment plant, the transmission line that's running in the northern part of

01:34:29.320 --> 01:34:33.880
 the city through this property, and the Clear Creek interceptor that's being

01:34:33.880 --> 01:34:39.960
 developed, it's with the intention that we are seeing development pressure

01:34:39.960 --> 01:34:46.400
 to the north of Lute 288, and then especially along the I-35 corridor.

01:34:46.400 --> 01:34:50.040
 So we're seeing that that's a trend in development going that way, and

01:34:50.040 --> 01:34:54.640
 this is, so the city's preparing for that to become a reality in the future.

01:34:54.640 --> 01:34:55.240
 >> Okay.

01:34:55.240 --> 01:34:59.240
 >> [INAUDIBLE]

01:34:59.240 --> 01:35:09.320
 >> Okay, with regard to the leapfrog development.

01:35:09.320 --> 01:35:13.760
 And I apologize for, when we come see you, we will have a proper map that really

01:35:13.760 --> 01:35:17.840
 shows, I mean, it really blows it up and shows this area.

01:35:17.840 --> 01:35:20.100
 And so what I meant by leapfrog development, yes,

01:35:20.100 --> 01:35:22.240
 it seems like it's a leapfrog development.

01:35:22.240 --> 01:35:27.840
 But when this was annexed in 2008 and 9, they basically went up the roadway here

01:35:27.840 --> 01:35:30.680
 and went 1,000 feet on either side of the roadway, right, and

01:35:30.680 --> 01:35:32.440
 just grabbed those little parcels.

01:35:32.440 --> 01:35:36.360
 But all of this area is in, there's a huge amount of floodplain here, so

01:35:36.360 --> 01:35:39.800
 it's not developable, so we are the next development.

01:35:39.800 --> 01:35:45.840
 So it's really not leapfrog development, it's the next acreage to be developed.

01:35:45.840 --> 01:35:48.320
 Which is why I think the city annexed it and

01:35:48.320 --> 01:35:51.040
 why they envisioned that it would be developed.

01:35:51.040 --> 01:35:54.720
 Now it's been sitting on the books as ag for 17 years, but now there's an opportunity

01:35:54.720 --> 01:36:01.440
 to take in all 2,500 acres as a revenue generating service for your city.

01:36:01.440 --> 01:36:02.160
 >> Okay.

01:36:02.160 --> 01:36:03.160
 No, I appreciate that.

01:36:03.160 --> 01:36:11.160
 I think I would just like some clarification,

01:36:11.160 --> 01:36:16.760
 not right now, but in the future from staff, our comp plan says,

01:36:16.760 --> 01:36:20.240
 in the land use element, it says the availability of green field land coupled

01:36:20.240 --> 01:36:24.760
 with the demand for large single family detached dwelling residential subdivisions

01:36:24.760 --> 01:36:29.240
 has facilitated development that outwardly expanded the suburban fringe

01:36:29.240 --> 01:36:32.240
 at a relatively low density and intensity.

01:36:32.240 --> 01:36:36.880
 This trend has resulted in a land use pattern that has tended to further extend

01:36:36.880 --> 01:36:41.040
 distances between where people live, work, and shop, resulting in a rate of land

01:36:41.040 --> 01:36:47.920
 consumption and sprawl which grew faster than the underlying growth of the population,

01:36:47.920 --> 01:36:52.920
 producing an unsustainable trend that is costly for the city and taxpayers alike.

01:36:52.920 --> 01:36:57.160
 Meanwhile, considerably more vacant land exists within the present city limits,

01:36:57.160 --> 01:37:01.840
 both unplatted tracks and already planned and approved master plan communities

01:37:01.840 --> 01:37:05.240
 than can be absorbed by the city's projected population growth over the next

01:37:05.240 --> 01:37:06.680
 two decades and beyond.

01:37:06.680 --> 01:37:10.400
 So like you said, maybe that's false now, I don't know.

01:37:10.400 --> 01:37:13.920
 But I would just like some staff response to that over the next few weeks.

01:37:13.920 --> 01:37:16.480
 - We'll bring it back with a comprehensive plan amendment discussion.

01:37:16.480 --> 01:37:25.960
 - And yeah, I did want to, just for our commission understanding,

01:37:25.960 --> 01:37:31.240
 a lot of these terms get confusing and I'm probably the worst about just

01:37:31.240 --> 01:37:34.400
 throwing out a term.

01:37:34.400 --> 01:37:37.840
 Certainly, everybody's free to define terms however they want.

01:37:37.840 --> 01:37:44.280
 But the American Planning Association, how they define smart growth as they say,

01:37:44.280 --> 01:37:48.760
 compact transit accessible pedestrian oriented mixed use development patterns

01:37:48.760 --> 01:37:55.560
 and land reuse epitomize the application of principles of smart growth.

01:37:55.560 --> 01:38:00.400
 In contrast to prevalent development practices, smart growth reinforces

01:38:00.400 --> 01:38:05.200
 a larger share of regional growth within central cities, urbanized areas,

01:38:05.200 --> 01:38:11.360
 inner suburbs and areas that are already served by infrastructure, I think it goes on.

01:38:11.360 --> 01:38:16.880
 So just for context of some other definitions.

01:38:16.880 --> 01:38:23.280
 Yeah, I'll say this looks like a superbly designed sort of bedroom residential

01:38:23.280 --> 01:38:30.840
 community that a lot of people would want to live in that I have no problem with that.

01:38:30.840 --> 01:38:34.440
 The concern I have is from a fiscal perspective, so I'll be interested to see

01:38:34.440 --> 01:38:40.080
 once that fiscal analysis is complete and really see what that looks like

01:38:40.080 --> 01:38:44.960
 from a bottoms up roll up of can we afford to maintain the streets

01:38:44.960 --> 01:38:46.520
 and replace them when they fail.

01:38:46.520 --> 01:38:48.040
 - Okay. - So thank you.

01:38:48.040 --> 01:38:54.760
 Any other questions from the commission or comments?

01:38:54.760 --> 01:38:56.280
 Commissioner MacDuff.

01:38:56.280 --> 01:39:02.040
 - I just want to make sure that our comment, my comment and Commissioner Dyer's comment

01:39:02.040 --> 01:39:09.200
 about the ratio of the town homes versus the multifamily is included in the staff

01:39:09.200 --> 01:39:12.280
 commentary that we'll see later on.

01:39:12.280 --> 01:39:15.280
 - Yeah, I think Haley will have that note.

01:39:15.280 --> 01:39:19.960
 Yeah, and I do want to make another comment too that I think those are maximums

01:39:19.960 --> 01:39:21.120
 in the zoning ordinance.

01:39:21.120 --> 01:39:26.080
 And so as this thing builds out over the next 20 years that it's not necessarily

01:39:26.080 --> 01:39:29.640
 set that yes, there will be this exact number of multifamily.

01:39:29.640 --> 01:39:44.560
 That's a maximum so there could be no multifamily in this project as it moves forward.

01:39:44.560 --> 01:39:46.520
 - Okay, not seeing any other questions.

01:39:46.520 --> 01:39:51.640
 Thank you very much.

01:39:51.640 --> 01:40:01.200
 That concludes our work sessions for this afternoon at 6.11 p.m. we will break for dinner

01:40:01.200 --> 01:40:03.600
 and we'll be back in council chambers at 6.30.

01:40:03.600 --> 01:40:11.680
 Thank you.

01:40:11.680 --> 01:40:12.520
 - Good evening.

01:40:12.520 --> 01:40:20.160
 At 6.33 p.m. this Wednesday, October 22nd, 2025, I will call the regular meeting of the

01:40:20.160 --> 01:40:22.480
 Denton Planning and Zoning Commission to order.

01:40:22.480 --> 01:40:27.000
 Our first order of business is to stand and say the Pledge of Allegiance to the US and

01:40:27.000 --> 01:40:32.000
 Texas Flag.

01:40:32.000 --> 01:40:52.640
 I pledge allegiance to the flag of the United States of America and to the republic for

01:40:52.640 --> 01:40:53.640
 which it stands, one nation under God, indivisible, with liberty and justice for all.

01:40:53.640 --> 01:40:54.640
 - I pledge allegiance to the flag of the United States of America and to the republic for

01:40:54.640 --> 01:40:55.640
 which it stands, one nation under God, indivisible, with liberty and justice for all.

01:40:55.640 --> 01:40:56.640
 - I pledge allegiance to the flag of the United States of America and to the republic

01:40:56.640 --> 01:40:57.640
 for which it stands, one nation under God, indivisible, with liberty and justice for

01:40:57.640 --> 01:40:58.640
 all.

01:40:58.640 --> 01:40:59.640
 - I pledge allegiance to the flag of the United States of America and to the republic

01:40:59.640 --> 01:41:00.640
 for which it stands, one nation under God, indivisible, with liberty and justice for

01:41:00.640 --> 01:41:01.640
 all.

01:41:01.640 --> 01:41:10.240
 That brings us to item 2, PZ 25-197, consider approval of the planning and zoning minutes

01:41:10.240 --> 01:41:12.480
 from October 8th.

01:41:12.480 --> 01:41:21.920
 Any questions or motion from the commission?

01:41:21.920 --> 01:41:22.920
 Commissioner McDade?

01:41:22.920 --> 01:41:26.760
 Motion to approve.

01:41:26.760 --> 01:41:28.860
 That's a motion to approve.

01:41:28.860 --> 01:41:29.860
 And Commissioner Riggs?

01:41:29.860 --> 01:41:30.860
 I second.

01:41:30.860 --> 01:41:40.360
 Seeing no questions, I'll call for a vote on the board.

01:41:40.360 --> 01:41:42.960
 That item passes 7-0.

01:41:42.960 --> 01:41:52.560
 Brings us to our consent agenda, item 3A, FR 25-001-0A, is the only item.

01:41:52.560 --> 01:41:59.760
 Any questions or a motion on the consent agenda?

01:41:59.760 --> 01:42:01.320
 Commissioner Riggs?

01:42:01.320 --> 01:42:04.680
 Make a motion to approve the consent agenda.

01:42:04.680 --> 01:42:07.560
 And Commissioner Garland?

01:42:07.560 --> 01:42:10.560
 And I second to move forward with the consent agenda.

01:42:10.560 --> 01:42:23.120
 With the motion as second, seeing no other questions, I'll call for a vote on the board.

01:42:23.120 --> 01:42:25.780
 That item passes 7-0.

01:42:25.780 --> 01:42:41.860
 Brings us to our items for individual consideration PZ 25-196.

01:42:41.860 --> 01:42:46.360
 So this item is just consideration of your calendar for next year.

01:42:46.360 --> 01:42:50.360
 We did our best to keep meetings on the second and fourth Tuesdays, which was the pattern

01:42:50.360 --> 01:42:54.760
 we had this year, but there are a few exceptions for holidays accommodating for the school

01:42:54.760 --> 01:42:56.560
 district spring break and things of that sort.

01:42:56.560 --> 01:43:01.660
 But if you all have any concerns with the calendar, we can consider making modifications

01:43:01.660 --> 01:43:05.640
 to it as needed.

01:43:05.640 --> 01:43:09.440
 Any questions?

01:43:09.440 --> 01:43:13.040
 Just to clarify, just for the record, I believe you said on Tuesdays, but I think you meant

01:43:13.040 --> 01:43:14.040
 Wednesdays.

01:43:14.040 --> 01:43:16.760
 Yes, you're correct.

01:43:16.760 --> 01:43:23.720
 We almost got an update to the council, the first city to have dueling councils.

01:43:23.720 --> 01:43:27.200
 Okay.

01:43:27.200 --> 01:43:31.680
 Any other questions or a motion?

01:43:31.680 --> 01:43:34.480
 Commissioner Dyer?

01:43:34.480 --> 01:43:40.660
 I make a motion that we approve the 2026 Planning and Zoning Commission as it sits before us.

01:43:40.660 --> 01:43:45.280
 And the calendar, right?

01:43:45.280 --> 01:43:46.280
 The calendar.

01:43:46.280 --> 01:43:47.280
 What did I, did I not say calendar?

01:43:47.280 --> 01:43:48.880
 Just to approve the commission.

01:43:48.880 --> 01:43:49.880
 Oh, sorry.

01:43:49.880 --> 01:43:50.880
 I think.

01:43:50.880 --> 01:43:51.880
 Yes.

01:43:51.880 --> 01:43:52.880
 Yes, calendar.

01:43:52.880 --> 01:43:53.880
 Okay.

01:43:53.880 --> 01:43:55.000
 Commissioner Garland.

01:43:55.000 --> 01:43:59.680
 And I second the approval of the 2026 Planning and Zoning Commission calendar.

01:43:59.680 --> 01:44:01.360
 Thank you.

01:44:01.360 --> 01:44:14.120
 With a motion and a second and no questions, I call for a vote on the board.

01:44:14.120 --> 01:44:25.360
 That item passes 7-0, brings us to our second item for individual consideration, FP250028.

01:44:25.360 --> 01:44:26.360
 Welcome Angie.

01:44:26.360 --> 01:44:31.080
 Good evening chair and members of the commission.

01:44:31.080 --> 01:44:36.120
 Angie Manglaris, assistant planning director here to present FP250028.

01:44:36.120 --> 01:44:38.960
 This is a final plat for the reserve at Brush Creek.

01:44:38.960 --> 01:44:44.840
 It is a single family residential subdivision situated the northeast corner of Brush Creek

01:44:44.840 --> 01:44:45.840
 and US377.

01:44:45.840 --> 01:44:51.120
 At this time, the final plat does not meet all of our criteria for approval, but staff

01:44:51.120 --> 01:44:56.440
 has no objection to the requested extension that could be granted to date certain of November

01:44:56.440 --> 01:44:57.440
 17th.

01:44:57.440 --> 01:45:04.520
 I'm happy to answer any questions you all may have.

01:45:04.520 --> 01:45:08.520
 Any questions from the commission?

01:45:08.520 --> 01:45:21.680
 Or a motion?

01:45:21.680 --> 01:45:22.680
 Commissioner Dyer.

01:45:22.680 --> 01:45:31.840
 I make a motion that we go ahead and delay the approval of this to deny it today, but

01:45:31.840 --> 01:45:37.120
 to go ahead and approve the extension for November 17th.

01:45:37.120 --> 01:45:39.160
 Commissioner Riggs.

01:45:39.160 --> 01:45:41.800
 I second that.

01:45:41.800 --> 01:45:42.800
 Very good.

01:45:42.800 --> 01:45:54.680
 Seeing no more questions, I'll call for a vote on the board.

01:45:54.680 --> 01:46:13.080
 And that item passes 7-0.

01:46:13.080 --> 01:46:17.240
 Brings us to our last item of individual consideration.

01:46:17.240 --> 01:46:21.120
 Commissioner McDade, if you want to recuse, you may.

01:46:21.120 --> 01:46:28.520
 At the record show, Commissioner McDade is recusing herself and Commissioner Riggs as

01:46:28.520 --> 01:46:34.800
 well on item 4C, FR25-0020.

01:46:34.800 --> 01:46:45.600
 Good evening, I'm Julie Wyatt, presenting FR2520.

01:46:45.600 --> 01:46:53.640
 This is a replat of a four-plex development located just west of Loop 288, south of Audra.

01:46:53.640 --> 01:47:00.000
 Originally, in your packet, the staff recommended denial with a proposed extension.

01:47:00.000 --> 01:47:05.800
 However, staff and the applicant worked together and they resolved all comments, and so staff

01:47:05.800 --> 01:47:09.120
 has modified the recommendation to approval.

01:47:09.120 --> 01:47:12.920
 I'll be happy to answer any questions.

01:47:12.920 --> 01:47:23.640
 Glad to see this coming through, it's been a while.

01:47:23.640 --> 01:47:30.040
 Yeah, I'm not sure which one of these will be three-plexes and four-plexes, but I will

01:47:30.040 --> 01:47:37.680
 point out that this is very near to our 2,000 square foot minimum proposed for DDC amendments

01:47:37.680 --> 01:47:49.440
 for the townhomes, and so the parking requirement that we have for sale townhomes does limit

01:47:49.440 --> 01:47:53.920
 how small of a townhome you can build for purchase.

01:47:53.920 --> 01:47:54.920
 Any other?

01:47:54.920 --> 01:47:55.920
 Commissioner McDuff.

01:47:55.920 --> 01:48:03.600
 Oh, yes, I'd like to agree with the staff and make a motion to approve the request by

01:48:03.600 --> 01:48:07.800
 ECM Eden Village LP.

01:48:07.800 --> 01:48:11.440
 Make that approval, please.

01:48:11.440 --> 01:48:13.860
 And Commissioner Ketreson.

01:48:13.860 --> 01:48:16.960
 I'll second that.

01:48:16.960 --> 01:48:19.120
 Very well.

01:48:19.120 --> 01:48:37.080
 Seeing no questions further, I'll call for a vote on the board.

01:48:37.080 --> 01:48:45.040
 That item passes 5-0 with two recusals.

01:48:45.040 --> 01:48:51.520
 Let the record show that Commissioner Riggs and Commissioner McDade are rejoining us for

01:48:51.520 --> 01:48:56.440
 our first public hearing, item 5A, HL 25-0002.

01:48:56.440 --> 01:49:02.080
 Thank you, Chair and Commission, Cameron Robertson, Historic Preservation Officer.

01:49:02.080 --> 01:49:07.840
 This is for a historic landmark designation of 3316 Roseland Drive.

01:49:07.840 --> 01:49:12.760
 The property is located at the northeast corner of Roseland Drive and Roseland Circle.

01:49:12.760 --> 01:49:15.180
 The owner is Lee Ann Todd.

01:49:15.180 --> 01:49:23.120
 Construction dates range from approximately 1870s to the 1960s in a multi-phase construction.

01:49:23.120 --> 01:49:27.000
 As I stated, this is a request for a historic landmark designation.

01:49:27.000 --> 01:49:32.800
 It is zoned R4, and it is a single-family residence.

01:49:32.800 --> 01:49:37.760
 Just to go through some photos of the property itself, this shows on the left-hand side that

01:49:37.760 --> 01:49:47.640
 front south facade and the rear north facades, the east and west facades of the property,

01:49:47.640 --> 01:49:52.400
 south and west facade view of the property, because it's pretty large, and then the circa

01:49:52.400 --> 01:49:55.920
 1960s pool and cabana in the rear.

01:49:55.920 --> 01:50:02.640
 This is a survey of the property, which it is the one that is bordered in red.

01:50:02.640 --> 01:50:08.480
 I did look at the Denton Development Code section 2.9.4b, specifically stating that

01:50:08.480 --> 01:50:15.080
 3316 Roseland Drive meets following criteria of 3, 5, 9, and 11.

01:50:15.080 --> 01:50:17.640
 I'm not going to read those out loud.

01:50:17.640 --> 01:50:22.880
 They were in your backup packet, but looking at approval criteria 3 and 9, it's really

01:50:22.880 --> 01:50:26.080
 concentrated more on that architectural style.

01:50:26.080 --> 01:50:32.560
 The home itself has a lot of Victorian influences for architecture, ranging from that late Victorian

01:50:32.560 --> 01:50:36.480
 vernacular to those mid-century influences.

01:50:36.480 --> 01:50:40.680
 You can see the example of the Italianate and the Greek Revival, which was highlighted

01:50:40.680 --> 01:50:44.760
 a little bit more in your backup packet, but you can see both of those influences on that

01:50:44.760 --> 01:50:48.080
 3316 Roseland Drive property.

01:50:48.080 --> 01:50:56.880
 As I stated in the criteria 9, it is that cumulative history of architecture over time.

01:50:56.880 --> 01:51:00.200
 In criteria 5, it was constructed in three phases.

01:51:00.200 --> 01:51:06.560
 We have that side gabled hall and parlor type residence, which is that pre-1880.

01:51:06.560 --> 01:51:10.280
 We have a vernacular addition that was added to that front south facade, which is highlighted

01:51:10.280 --> 01:51:14.560
 in that center photo, which is 1880 to 1910.

01:51:14.560 --> 01:51:20.320
 Then we have that influence of the Greek and Italianate Revival addition at that front facade,

01:51:20.320 --> 01:51:25.840
 with some additional architectural detailing along the roof and the eaves.

01:51:25.840 --> 01:51:31.960
 In addition, we have that pool and cabana construction in the rear in the 1960s.

01:51:31.960 --> 01:51:33.960
 We're also looking at criteria 11.

01:51:33.960 --> 01:51:38.880
 Dr. Harold Brenholtz, he is the eighth owner of this property, or he was the eighth owner

01:51:38.880 --> 01:51:40.100
 of this property.

01:51:40.100 --> 01:51:44.400
 He taught at North Texas State University, which is now University of North Texas.

01:51:44.400 --> 01:51:49.120
 He was a professor of education from 1923 to 1960.

01:51:49.120 --> 01:51:54.360
 He actually helped launch the school's education doctoral program.

01:51:54.360 --> 01:52:00.520
 He was one of the original organizers of the Denton Lions Club, which is an international

01:52:00.520 --> 01:52:01.520
 service club.

01:52:01.520 --> 01:52:05.400
 He also served the Denton community as a scoutmaster.

01:52:05.400 --> 01:52:09.960
 You can see the arrows pointing to him in some of the photos and just some of the different

01:52:09.960 --> 01:52:14.000
 articles in the staff directory.

01:52:14.000 --> 01:52:18.720
 Looking not only at the criteria, staff analysis also looked at the 2019 Historic Preservation

01:52:18.720 --> 01:52:25.360
 Plan, goal number one, policy 1.3, which looks at prioritizing and designing eligible buildings

01:52:25.360 --> 01:52:28.640
 and areas for potential landmarks and historic districts.

01:52:28.640 --> 01:52:33.640
 Then also our Denton 2040 Comprehensive Plan, goal CC2, which preserves and maintain the

01:52:33.640 --> 01:52:36.920
 unique character of Denton.

01:52:36.920 --> 01:52:42.740
 There was public outreach done, both newspaper, website, property sign posted.

01:52:42.740 --> 01:52:50.000
 We did receive one response in favor, as you all got that email earlier today.

01:52:50.000 --> 01:52:56.840
 Staff is recommending approval for the property at 3316 Rose Lawn Drive, as the designation

01:52:56.840 --> 01:53:00.680
 is consistent with the goals and objectives of our Denton 2040 Comprehensive Plan, as

01:53:00.680 --> 01:53:05.520
 well as the Denton Development Code and our 2019 Historic Preservation Plan.

01:53:05.520 --> 01:53:10.080
 Historic Landmark Commission did review this, and they recommended approval for zero.

01:53:10.080 --> 01:53:12.720
 It will go forward to City Council on December 2nd.

01:53:12.720 --> 01:53:13.720
 I can stand for any questions.

01:53:13.720 --> 01:53:20.200
 The applicant is here if you have any questions for her as well.

01:53:20.200 --> 01:53:22.100
 Any questions from the commission?

01:53:22.100 --> 01:53:23.200
 This is a public hearing.

01:53:23.200 --> 01:53:30.640
 I will open the public hearing at this time.

01:53:30.640 --> 01:53:35.640
 I don't have any cards filled out to speak yet, but it is a public hearing.

01:53:35.640 --> 01:53:46.680
 You're welcome to come down and share your thoughts if you want to, for anyone here.

01:53:46.680 --> 01:53:55.680
 Seeing no one ... It's up to you.

01:53:55.680 --> 01:53:59.960
 Okay.

01:53:59.960 --> 01:54:05.160
 I'll close the public hearing at this time.

01:54:05.160 --> 01:54:08.520
 Any questions before ... Okay.

01:54:08.520 --> 01:54:09.520
 Commissioner McDuff?

01:54:09.520 --> 01:54:18.280
 I'm proud to make a motion to agree with the staff and our historical landmark officer

01:54:18.280 --> 01:54:23.680
 for the approval of the recommendation to the City Council regarding a request by Lee

01:54:23.680 --> 01:54:29.640
 and Todd, the property owner, for historic landmark designation in accordance with Section

01:54:29.640 --> 01:54:39.640
 2.9.4 of the Denton Development Code for the property located at 3316 Roseland Drive.

01:54:39.640 --> 01:54:41.320
 Commissioner Garland?

01:54:41.320 --> 01:54:45.760
 I will second the motion to approve staff recommendation.

01:54:45.760 --> 01:54:51.000
 You have a beautiful home.

01:54:51.000 --> 01:54:54.400
 Any other discussion from the commission?

01:54:54.400 --> 01:55:08.000
 Yeah, I'll just say I have conflicted thoughts with many of the historic preservation applications,

01:55:08.000 --> 01:55:12.800
 not because I don't believe in historic preservation, but because I want to make sure we're focusing

01:55:12.800 --> 01:55:24.480
 our energy on places that will yield public benefit from an educational or appreciation

01:55:24.480 --> 01:55:25.480
 perspective.

01:55:25.480 --> 01:55:31.040
 I think the history of the historic designations of many of the older homes on Oak and Hickory

01:55:31.040 --> 01:55:37.940
 Street is a great testament to something that I would gander to say almost everybody in

01:55:37.940 --> 01:55:42.000
 our community knows about, right, because it's so visible.

01:55:42.000 --> 01:55:47.920
 But in this case, it's, you know, there's not really a, it's not in central Denton,

01:55:47.920 --> 01:55:55.400
 it's not, doesn't have any redevelopment potential really, and so I think that it's a fair application

01:55:55.400 --> 01:56:07.320
 of the tools that we have to make sure that unique architecture stays in good repair.

01:56:07.320 --> 01:56:21.360
 Seeing no other questions, I'll call for a vote on the board.

01:56:21.360 --> 01:56:24.560
 And that item passes 7-0.

01:56:24.560 --> 01:56:40.760
 That brings us to our second public hearing item, PDA 25-0002.

01:56:40.760 --> 01:56:41.760
 Good evening.

01:56:41.760 --> 01:56:46.440
 I'm Julie Wyatt, Principal Planner with the City of Denton, and I am presenting PDA 25-2,

01:56:46.440 --> 01:56:49.000
 which is a charter school.

01:56:49.000 --> 01:56:55.360
 So the request before you is a plan development amendment to one of our older PDs, PD 139.

01:56:55.360 --> 01:57:01.480
 The purpose of it is to allow a use that's been approved to move forward with development

01:57:01.480 --> 01:57:02.480
 of the property.

01:57:02.480 --> 01:57:10.300
 In 2020, the site plan was approved for a charter school through this plan development

01:57:10.300 --> 01:57:11.300
 amendment process.

01:57:11.300 --> 01:57:13.720
 However, there have been some changes.

01:57:13.720 --> 01:57:18.820
 They want to modify that site plan, and so they're coming back to you in order to do

01:57:18.820 --> 01:57:20.800
 so.

01:57:20.800 --> 01:57:25.880
 So they are proposing to modify the site plan that was approved, which includes removing

01:57:25.880 --> 01:57:32.960
 approximately 4.4 acres, reducing the building footprint and open space, removing the proposed

01:57:32.960 --> 01:57:34.280
 high school for now.

01:57:34.280 --> 01:57:40.560
 They may put that in later phases, and then reconfigure the parking and access areas.

01:57:40.560 --> 01:57:49.840
 The subject property is located on the south side of Vintage, just east of 35W.

01:57:49.840 --> 01:57:54.600
 Just a little bit of background about PD 139, it is one of our older PDs.

01:57:54.600 --> 01:58:02.980
 As I mentioned, it was established in 1991 as a 450-acre business village, and that permitted

01:58:02.980 --> 01:58:05.800
 the proposed institutional use.

01:58:05.800 --> 01:58:12.000
 It's been amended several times since it was originally created.

01:58:12.000 --> 01:58:16.320
 First of all, the Vintage neighborhood, just to the east of the subject property.

01:58:16.320 --> 01:58:20.820
 There was a request for gas well development, and that was approved.

01:58:20.820 --> 01:58:24.080
 And then the proposed charter school in 2020.

01:58:24.080 --> 01:58:29.280
 Since 2020, there's also been a multifamily development approved, just adjacent to the

01:58:29.280 --> 01:58:32.600
 west of the subject property, and a commercial use.

01:58:32.600 --> 01:58:38.500
 It's under development now, but it is proposed for that corner at 35 and Vintage.

01:58:38.500 --> 01:58:45.240
 It's also important to note that the 450 acres has shrunk, and that 213 of those acres have

01:58:45.240 --> 01:58:51.920
 been rezoned out of the PD and into just based zoning districts.

01:58:51.920 --> 01:58:55.800
 So the request before you, sorry, there's a lot on this slide, but just wanted to allow

01:58:55.800 --> 01:58:59.960
 you to kind of compare what was approved and what they're proposing.

01:58:59.960 --> 01:59:04.800
 We won't go a lot into the approved plan, but you could see the campus took up a much

01:59:04.800 --> 01:59:09.760
 larger footprint, included a high school at that time.

01:59:09.760 --> 01:59:12.560
 They extended all the way north to Vintage.

01:59:12.560 --> 01:59:18.880
 There was a driveway access point to Vintage, which will remain in the revision, as well

01:59:18.880 --> 01:59:22.520
 as one access point to John Payne.

01:59:22.520 --> 01:59:28.440
 The proposed plan, which is on the right, would meet all PD setbacks, building heights,

01:59:28.440 --> 01:59:29.960
 not coverage.

01:59:29.960 --> 01:59:33.440
 They are only proposing the K-8 at this time.

01:59:33.440 --> 01:59:37.440
 Once again, the high school may come forward, but it would require another plan development

01:59:37.440 --> 01:59:38.920
 amendment.

01:59:38.920 --> 01:59:41.000
 They are proposing 130 spaces.

01:59:41.000 --> 01:59:43.480
 There are a lot more spaces shown on the site plan.

01:59:43.480 --> 01:59:48.880
 Those are ghosted in, kind of grayed out, and that's just to see where that parking

01:59:48.880 --> 01:59:52.320
 would potentially go with the high school.

01:59:52.320 --> 01:59:56.880
 And then, as I mentioned, there's also space for that high school, as well as athletic

01:59:56.880 --> 01:59:59.640
 fields, to support that.

01:59:59.640 --> 02:00:04.280
 Access has changed a little bit in that there is still that same access point on the north

02:00:04.280 --> 02:00:10.240
 side, but then there are two proposed access points on John Payne, which allows vehicle

02:00:10.240 --> 02:00:11.520
 circulation.

02:00:11.520 --> 02:00:14.000
 And just to point out, John Payne isn't there right now.

02:00:14.000 --> 02:00:15.760
 It is a mobility plan road.

02:00:15.760 --> 02:00:18.460
 It's intended for a secondary arterial.

02:00:18.460 --> 02:00:22.100
 This is kind of the first leg of it on the north side.

02:00:22.100 --> 02:00:25.040
 It will eventually connect south.

02:00:25.040 --> 02:00:29.740
 So this is kind of the first part of it in this area.

02:00:29.740 --> 02:00:34.600
 And then you could see the buildings, the proposed buildings, outlined in blue, as well

02:00:34.600 --> 02:00:36.740
 as the play area.

02:00:36.740 --> 02:00:41.960
 The line in pink shows kind of where those drive aisles are.

02:00:41.960 --> 02:00:45.800
 A little bit about transportation and traffic management, because it's always something

02:00:45.800 --> 02:00:48.960
 that comes up, especially when we're talking about schools.

02:00:48.960 --> 02:00:53.720
 They did update their TIA that was originally approved in 2020.

02:00:53.720 --> 02:00:57.400
 There have been some changes in the area, as we discussed in work session.

02:00:57.400 --> 02:00:59.440
 The multifamily has been constructed.

02:00:59.440 --> 02:01:01.080
 There's commercial development.

02:01:01.080 --> 02:01:02.600
 Just a lot of differences in the area.

02:01:02.600 --> 02:01:05.720
 So they needed to update that TIA.

02:01:05.720 --> 02:01:08.840
 Our transportation folks have reviewed it and approved it.

02:01:08.840 --> 02:01:16.680
 And those lines in red are the system improvements that they need to make for this project.

02:01:16.680 --> 02:01:23.020
 So they rely on those turn lanes to allow parents or people entering the site to get

02:01:23.020 --> 02:01:27.240
 out of those lanes of traffic so they can make safe turning movements.

02:01:27.240 --> 02:01:33.360
 So both a left turn lane and a right turn lane off of Vintage onto John Payne.

02:01:33.360 --> 02:01:38.160
 And then two turn lanes into the school site off of John Payne.

02:01:38.160 --> 02:01:42.520
 And then one on John Payne, as one would turn right onto Vintage.

02:01:42.520 --> 02:01:48.040
 It's important to note that they have looked at the circulation on site.

02:01:48.040 --> 02:01:53.440
 The Northern driveway would not be available to parents during drop off or pick up.

02:01:53.440 --> 02:01:57.160
 That is something that they are going to disallow.

02:01:57.160 --> 02:02:04.520
 And that the parents will have to navigate through a loop system off of the John Payne

02:02:04.520 --> 02:02:06.080
 exit or entrance.

02:02:06.080 --> 02:02:11.320
 And you can see that they've done that analysis for the queuing to ensure that there's sufficient

02:02:11.320 --> 02:02:12.320
 space.

02:02:12.320 --> 02:02:17.200
 The criteria for approval for a plan development amendment are in subchapter two.

02:02:17.200 --> 02:02:22.000
 We won't go over all of them today because it is really kind of just that site plan approval.

02:02:22.000 --> 02:02:26.400
 But it is consistent with the criteria for approval, both the general and specific.

02:02:26.400 --> 02:02:34.800
 And just kind of highlighting that, it's consistent with our Denton 2040 comprehensive plan, both

02:02:34.800 --> 02:02:40.320
 in the future land use as well as in our economic vitality goals and our mobility policies.

02:02:40.320 --> 02:02:47.160
 It meets the PD development standards, provides that adequate roadway improvements, that queuing

02:02:47.160 --> 02:02:50.160
 the traffic management.

02:02:50.160 --> 02:02:56.440
 Any future additions to the site would require additional public hearings or potentially

02:02:56.440 --> 02:03:01.280
 zoning the property out of the PD if that's what they choose to do in the future.

02:03:01.280 --> 02:03:05.920
 And then it just provides another educational opportunity in this part of Denton.

02:03:05.920 --> 02:03:11.560
 So when you look at the DISD schools, there's not a lot of them are just really close.

02:03:11.560 --> 02:03:15.920
 So it'll provide an additional educational opportunity.

02:03:15.920 --> 02:03:17.640
 Public outreach was sent out.

02:03:17.640 --> 02:03:19.840
 We didn't receive any letters back.

02:03:19.840 --> 02:03:25.680
 I believe there was a comment that was provided today and was sent to you in favor of the

02:03:25.680 --> 02:03:26.680
 request.

02:03:26.680 --> 02:03:31.120
 And so staff recommends approval of the request as it complies with the applicable criteria.

02:03:31.120 --> 02:03:37.000
 If it moves forward tonight with a recommendation, it would go to city council public hearing

02:03:37.000 --> 02:03:40.240
 on November 18th, so next month.

02:03:40.240 --> 02:03:41.800
 I'll be happy to answer any questions.

02:03:41.800 --> 02:03:47.760
 The applicant is also here and will be available to answer any questions.

02:03:47.760 --> 02:03:51.160
 Any questions for staff?

02:03:51.160 --> 02:03:54.880
 I will open the public hearing at this time.

02:03:54.880 --> 02:03:58.560
 Yeah, Commissioner MacDuff.

02:03:58.560 --> 02:04:01.880
 Yes, I'm sure it's in here.

02:04:01.880 --> 02:04:07.600
 I can't recall it immediately, but why are we removing the proposed high school?

02:04:07.600 --> 02:04:09.800
 It's just something that they're not.

02:04:09.800 --> 02:04:12.120
 They're phasing the project.

02:04:12.120 --> 02:04:17.040
 They do anticipate, and the applicant is here, they do anticipate that it will come in the

02:04:17.040 --> 02:04:18.040
 future.

02:04:18.040 --> 02:04:19.040
 It's just this first phase.

02:04:19.040 --> 02:04:21.880
 They're not ready to move forward with those plans just yet.

02:04:21.880 --> 02:04:25.680
 Okay, thank you.

02:04:25.680 --> 02:04:34.360
 And I have a question, Julie.

02:04:34.360 --> 02:04:40.960
 I'm just trying to make sure I'm interpreting the PD development plan correctly.

02:04:40.960 --> 02:04:47.240
 Because the northern, I believe north is up on the site plan, right?

02:04:47.240 --> 02:04:48.240
 Correct.

02:04:48.240 --> 02:04:56.360
 Because the northern lot, that lot two is segmented out for later, normally I think

02:04:56.360 --> 02:05:02.040
 we wouldn't require perimeter street improvements on a lot that's not being developed.

02:05:02.040 --> 02:05:08.320
 In this case, are we requiring that sidewalk along that eastern driveway to be done with

02:05:08.320 --> 02:05:09.320
 this phase?

02:05:09.320 --> 02:05:11.680
 That is a great question, yes.

02:05:11.680 --> 02:05:18.360
 With this development, they will have to build half of John Payne Road and dedicate the necessary

02:05:18.360 --> 02:05:19.360
 right of way.

02:05:19.360 --> 02:05:25.000
 They'll also have to build that sidewalk, the pedestrian pathway from vintage to their

02:05:25.000 --> 02:05:29.280
 entrance to their property to provide the connectivity for students if students were

02:05:29.280 --> 02:05:30.280
 local.

02:05:30.280 --> 02:05:35.520
 Okay, thank you.

02:05:35.520 --> 02:05:36.520
 This is a public hearing.

02:05:36.520 --> 02:05:44.040
 I don't have any cards filled out at this time, but if anybody would like to say something,

02:05:44.040 --> 02:05:47.040
 you're welcome to.

02:05:47.040 --> 02:05:51.440
 I actually have a question for the applicant if you'd like to come up just to answer a

02:05:51.440 --> 02:05:52.440
 question.

02:05:52.440 --> 02:05:55.520
 You're welcome to share it more as well, if you could identify yourself.

02:05:55.520 --> 02:05:59.320
 Yes, my name's Matthew Bull, how are you doing today, sir?

02:05:59.320 --> 02:06:05.200
 You may not be aware of this because it's in esoteric details of how code gets developed,

02:06:05.200 --> 02:06:10.400
 but a couple of years ago at the request of the Denton Independent School District, we

02:06:10.400 --> 02:06:17.960
 actually increased the number of parking spaces that we require for various school types.

02:06:17.960 --> 02:06:29.080
 Then we made sure that we had a provision in the code to allow schools to provide alternate

02:06:29.080 --> 02:06:33.280
 documentation if they didn't need that many parking spaces, for instance.

02:06:33.280 --> 02:06:37.640
 Was that brought up during the development process with staff, and was that something

02:06:37.640 --> 02:06:38.840
 you pursued or chose not to?

02:06:38.840 --> 02:06:42.040
 It has not been brought up with me yet, but if that was something that I could honestly

02:06:42.040 --> 02:06:48.120
 talk to Mr. Westlake about and make sure that we have everything that you all need for that.

02:06:48.120 --> 02:06:51.160
 To be clear, I trust you all to decide the right things.

02:06:51.160 --> 02:06:56.360
 I just don't want to inadvertently increase the cost of education by building parking spaces

02:06:56.360 --> 02:06:57.360
 that aren't needed.

02:06:57.360 --> 02:07:00.440
 No, we want to do whatever we want, this has been a long time coming for us.

02:07:00.440 --> 02:07:04.920
 I don't know if you all know the whole history of Denton Classical, but this is not the first

02:07:04.920 --> 02:07:09.660
 location we've purchased, and so we're excited to be here, we're excited to grow, and we're

02:07:09.660 --> 02:07:15.520
 excited to move forward with the next steps for our students, so yes.

02:07:15.520 --> 02:07:17.520
 Any questions for the applicant?

02:07:17.520 --> 02:07:18.640
 I haven't seen any.

02:07:18.640 --> 02:07:19.640
 Thank you very much.

02:07:19.640 --> 02:07:23.680
 Thank you so much.

02:07:23.680 --> 02:07:28.240
 Any other members of the public wanting to speak, not seeing any movement, I'll close

02:07:28.240 --> 02:07:30.720
 the public hearing and open the floor.

02:07:30.720 --> 02:07:33.120
 We have a motion, Commissioner Riggs.

02:07:33.120 --> 02:07:39.020
 Yes, I'll make a motion to recommend this to council as recommended by staff.

02:07:39.020 --> 02:07:40.020
 And Commissioner MacDuff.

02:07:40.020 --> 02:07:49.000
 Yes, I'll second that motion to Commissioner Riggs.

02:07:49.000 --> 02:08:00.160
 Very good, I'll just say I'm glad that this is able to move forward, glad that the sidewalk

02:08:00.160 --> 02:08:09.160
 provision is there, I do yearn for a day when the backs of residential subdivisions would

02:08:09.160 --> 02:08:14.840
 have permeability so that people wouldn't have to walk around onto Vintage to get here,

02:08:14.840 --> 02:08:21.760
 but that was a while ago that that was decided.

02:08:21.760 --> 02:08:27.400
 Not seeing any other questions, sorry.

02:08:27.400 --> 02:08:35.560
 Yes, on the board is the agenda item, and we have a motion to approve.

02:08:35.560 --> 02:08:44.200
 Yeah, I think it updated when the motion was made.

02:08:44.200 --> 02:08:46.480
 Any other questions?

02:08:46.480 --> 02:09:14.680
 Not seeing any, I'll call for a vote on the board.

02:09:14.680 --> 02:09:21.960
 And that item passes 7-0, brings us to our last public hearing of the evening.

02:09:21.960 --> 02:09:23.960
 Item 5C, PD25-0004.

02:09:23.960 --> 02:09:38.760
 Okay, good evening Chair, members of the commission, Angie Manglaris, Assistant Planning Director

02:09:38.760 --> 02:09:42.920
 here to present PD25-0004, Brush Creek Center.

02:09:42.920 --> 02:09:47.800
 A little bit of background on this project, this is a request to rezone from Residential

02:09:47.800 --> 02:09:52.520
 1 to plan development with a base zoning of suburban corridor.

02:09:52.520 --> 02:09:56.780
 This is a plan development overlay, so with this they are imposing some additional conditions

02:09:56.780 --> 02:10:00.520
 upon themselves, but it's not that detailed site plan like we just saw with the charter

02:10:00.520 --> 02:10:02.440
 school plan development.

02:10:02.440 --> 02:10:08.600
 This is a 2.63 acre site, it is located at the northeast intersection of US 377 and Brush

02:10:08.600 --> 02:10:09.600
 Creek Road.

02:10:09.600 --> 02:10:13.040
 Currently, it is unimproved and consists of open pasture.

02:10:13.040 --> 02:10:18.840
 It is part of a larger 18 acre tract that is situated at that northeast corner.

02:10:18.840 --> 02:10:24.560
 The remainder is zoned PDR4 and that zoning change occurred late last year.

02:10:24.560 --> 02:10:28.120
 The future land use, we'll get more into it, but it is designated as neighborhood mixed

02:10:28.120 --> 02:10:33.360
 use and surrounding it is existing PD to the east, north, and west, as well as some R2

02:10:33.360 --> 02:10:35.600
 to the south.

02:10:35.600 --> 02:10:40.800
 This is situated at the northeast intersection of US 377 and Brush Creek Road.

02:10:40.800 --> 02:10:45.120
 US 377 is a north-south roadway owned and maintained by TechStat.

02:10:45.120 --> 02:10:51.160
 It is designated as a primary arterial with a planned build out of six lanes undivided.

02:10:51.160 --> 02:10:53.400
 And Brush Creek Road runs east-west.

02:10:53.400 --> 02:10:56.200
 It is situated along the south of the property line.

02:10:56.200 --> 02:11:01.080
 It is also designated as a primary arterial and will serve as a regional east-west connection

02:11:01.080 --> 02:11:06.920
 throughout the entire city, ultimately connecting to I-35W.

02:11:06.920 --> 02:11:10.960
 Staff did review this project against our criteria for approval and do find that it

02:11:10.960 --> 02:11:13.120
 meets these criteria.

02:11:13.120 --> 02:11:18.680
 More specifically, this particular area is primarily designated neighborhood mixed use.

02:11:18.680 --> 02:11:23.320
 It does call for the predominant use to be residential, but also notes that local serving

02:11:23.320 --> 02:11:28.560
 retail and service uses are appropriate in this area, particularly where there are areas

02:11:28.560 --> 02:11:32.640
 of future development as we see this area of the city continue to grow.

02:11:32.640 --> 02:11:37.320
 This will provide neighborhood serving retail and services that are critical to achieving

02:11:37.320 --> 02:11:39.880
 our balance and accessible neighborhoods.

02:11:39.880 --> 02:11:44.480
 The SC Zoning District is designed to be situated along moderate to high intensity corridors

02:11:44.480 --> 02:11:48.040
 and provide commercial, office, and retail uses.

02:11:48.040 --> 02:11:53.120
 As part of this PD overlay, they are prohibiting the more intensive land uses that would otherwise

02:11:53.120 --> 02:11:57.480
 be allowed in the Suburban Corridor Zoning District, helping to ensure compatibility

02:11:57.480 --> 02:12:03.080
 between that future use and existing and developing single-family residential in the vicinity

02:12:03.080 --> 02:12:05.360
 of the project.

02:12:05.360 --> 02:12:10.560
 This is an example of what you found in your backup as part of the PD overlay standards.

02:12:10.560 --> 02:12:15.000
 So the intent of the PD overlay is really to ensure that this is consistent with land

02:12:15.000 --> 02:12:20.480
 use patterns that you would expect to find along US 377 and won't introduce any incompatible

02:12:20.480 --> 02:12:22.320
 activities to the area.

02:12:22.320 --> 02:12:28.800
 The applicant is proposing to explicitly prohibit about 15 land uses in the SC Zoning District

02:12:28.800 --> 02:12:31.760
 that are typically associated with a little bit higher intensity.

02:12:31.760 --> 02:12:38.520
 So those uses that you see in that third column there are being prohibited from being developed

02:12:38.520 --> 02:12:42.840
 on this particular property, whereas they would otherwise be allowable in the SC Zoning

02:12:42.840 --> 02:12:43.840
 District.

02:12:43.840 --> 02:12:48.280
 Additionally, the applicant has provided some provisions for the location of the dumpster

02:12:48.280 --> 02:12:53.240
 enclosure and screening, ensuring that it's a minimum of 75 feet away from any residential

02:12:53.240 --> 02:12:56.600
 structure in addition to our typical screening requirements.

02:12:56.600 --> 02:13:02.480
 It does provide for a 10-foot landscape buffer along the northbound shoulder of 377 that

02:13:02.480 --> 02:13:07.240
 needs to be outside of the right-of-way, as well as any future public utility easements,

02:13:07.240 --> 02:13:12.200
 and does allow for continuity of existing roadway conditions for non-motorized users

02:13:12.200 --> 02:13:15.720
 of US 377.

02:13:15.720 --> 02:13:20.560
 Public outreach was conducted in accordance with state law, as well as city ordinances.

02:13:20.560 --> 02:13:23.340
 We did receive three responses in favor.

02:13:23.340 --> 02:13:27.440
 Those were one owner who owns multiple parcels within the area.

02:13:27.440 --> 02:13:34.040
 The applicant did hold three neighborhood meetings since April of 2025 of this year.

02:13:34.040 --> 02:13:37.240
 And staff is recommending approval of this request as it complies with their criteria

02:13:37.240 --> 02:13:38.240
 for approval.

02:13:38.240 --> 02:13:42.920
 It is tentatively scheduled for city council on December 2nd, and I'm happy to answer any

02:13:42.920 --> 02:13:44.400
 questions you may have.

02:13:44.400 --> 02:13:48.720
 The applicant is also here and I believe has a brief presentation for you all.

02:13:48.720 --> 02:13:49.720
 Okay.

02:13:49.720 --> 02:13:51.920
 Any questions for staff at this time?

02:13:51.920 --> 02:13:58.160
 I don't see it.

02:13:58.160 --> 02:14:04.960
 I will open the public hearing at this time and ask Mr. Trey Jacobson, is that correct?

02:14:04.960 --> 02:14:07.440
 You can come down.

02:14:07.440 --> 02:14:13.480
 And as the applicant representative, you and whoever else would like to speak on behalf

02:14:13.480 --> 02:14:18.700
 of the applicant have a total of 20 minutes, however you want to divvy that up.

02:14:18.700 --> 02:14:19.700
 Well thank you, Chair.

02:14:19.700 --> 02:14:25.400
 I promise not to take that 20 minutes from you, just Chair and members of the commission.

02:14:25.400 --> 02:14:26.400
 My name is Trey Jacobson.

02:14:26.400 --> 02:14:31.160
 I'm a land use consultant, and for the record, I'm addressed at 124 East Edgewood Place in

02:14:31.160 --> 02:14:33.240
 San Antonio, Texas.

02:14:33.240 --> 02:14:36.600
 And I'm representing the prospective buyer and developer of this site.

02:14:36.600 --> 02:14:40.640
 I should also mention we have the consulting engineers from Anhard here if there's any

02:14:40.640 --> 02:14:42.680
 particular questions that you may have.

02:14:42.680 --> 02:14:48.600
 Angie did such a good job with her presentation, I'm going to go ahead and really skip to the

02:14:48.600 --> 02:14:49.600
 aspects of it.

02:14:49.600 --> 02:14:55.840
 I did want to stress that while this is not yet a future major intersection, this is where

02:14:55.840 --> 02:15:01.540
 two major thoroughfares are going to cross and it will be in the not too distant future.

02:15:01.540 --> 02:15:07.080
 So just stepping back from a land use standpoint, the fact that it is at that major intersection

02:15:07.080 --> 02:15:11.040
 and as it's consistent with the future land use plans, there's no environmentally sensitive

02:15:11.040 --> 02:15:12.040
 areas in it.

02:15:12.040 --> 02:15:16.960
 This kind of makes it, just from a pure land use standpoint, a perfect commercial corner,

02:15:16.960 --> 02:15:19.800
 which is one of the things that has attracted the interest in this project.

02:15:19.800 --> 02:15:24.720
 And we're simply looking at more of a highway, as you would see on Forward Drive, a highway

02:15:24.720 --> 02:15:26.680
 oriented commercial retail center.

02:15:26.680 --> 02:15:30.480
 I can't tell you who's going to be there, and I don't know the exact configuration,

02:15:30.480 --> 02:15:34.040
 and we needed that flexibility as this site is ultimately developed.

02:15:34.040 --> 02:15:37.880
 And that's why we originally went with straight SC.

02:15:37.880 --> 02:15:43.000
 Now we ultimately rolled that back to a PD overlay, because we agree, in fact, we propose

02:15:43.000 --> 02:15:44.760
 that there's a lot of incompatibility.

02:15:44.760 --> 02:15:47.880
 So this is more like SC light, as we were proposing it.

02:15:47.880 --> 02:15:52.480
 But as this is a conceptual site plan that we've been working with the neighborhood on,

02:15:52.480 --> 02:15:57.360
 this shows that two entry points that are permissible, given the entryways, as well

02:15:57.360 --> 02:16:01.480
 as the right of way dedications that are ultimately going to be required, there's a lot of infrastructure

02:16:01.480 --> 02:16:06.520
 that's ultimately going to be built, including roadway and turn lane expansion from 377.

02:16:06.520 --> 02:16:11.480
 We have to build the north half of Brush Creek, again, as a major arterial, and improve it

02:16:11.480 --> 02:16:15.480
 along with all the pedestrian mobility and landscaping that's going to go on.

02:16:15.480 --> 02:16:17.480
 That will be part of this project.

02:16:17.480 --> 02:16:22.480
 This shows a single 13,700 square foot building.

02:16:22.480 --> 02:16:28.200
 Now this is just meant to be a contemplative analysis around how much could theoretically

02:16:28.200 --> 02:16:31.960
 you put on the site with all the required parking, and for a sense of scale, if you're

02:16:31.960 --> 02:16:37.080
 wondering what that looks like, that's like a Walgreens, a CVS, a Trader Joe's.

02:16:37.080 --> 02:16:38.200
 That's the size.

02:16:38.200 --> 02:16:39.520
 So that's the maximum potential.

02:16:39.520 --> 02:16:42.920
 But that's really not what's envisioned here.

02:16:42.920 --> 02:16:49.960
 We're envisioning more of a multi-tenant retail with upgraded aesthetics to it.

02:16:49.960 --> 02:16:52.800
 We let our architectural team run wild.

02:16:52.800 --> 02:16:53.960
 This is one concept.

02:16:53.960 --> 02:16:54.960
 This is another concept.

02:16:54.960 --> 02:16:58.920
 This just shows a four bay type of approach.

02:16:58.920 --> 02:17:03.800
 Just to, again, this is not ultimately what it's going to look like, or how we could ultimately

02:17:03.800 --> 02:17:04.800
 defect.

02:17:04.800 --> 02:17:06.960
 This one shows the division between the two buildings.

02:17:06.960 --> 02:17:10.760
 So there's a lot of flexibility that could ultimately take place.

02:17:10.760 --> 02:17:13.120
 So we already talked about the PD overlay.

02:17:13.120 --> 02:17:18.240
 If you're familiar with the Viridian project, which is at 500 Fort Worth Drive, this is also

02:17:18.240 --> 02:17:19.400
 SC zoning.

02:17:19.400 --> 02:17:20.400
 This is a straight SC.

02:17:20.400 --> 02:17:25.480
 But this kind of gives you a sense of a comparable sized type of project like that to give you

02:17:25.480 --> 02:17:29.240
 a sense of flavor for how it would fit in with the site.

02:17:29.240 --> 02:17:33.000
 I think it's important to talk about the community engagement, and Angie mentioned in her presentation

02:17:33.000 --> 02:17:34.000
 we had a number of meetings.

02:17:34.000 --> 02:17:37.400
 We've been engaging with the community all the way back to January in this, including

02:17:37.400 --> 02:17:42.360
 surveys of the neighbors within 500 feet, asking them for their input on their concerns

02:17:42.360 --> 02:17:43.360
 on the site.

02:17:43.360 --> 02:17:44.680
 We've taken those.

02:17:44.680 --> 02:17:48.200
 We worked with them in designing the site, explaining how this is done.

02:17:48.200 --> 02:17:53.760
 We also went through some of the zoning options, hearing what their concerns are around land

02:17:53.760 --> 02:17:54.760
 use and compatibility.

02:17:54.760 --> 02:17:58.760
 A lot of the -- a number of the uses that are on the list of what are prohibited uses

02:17:58.760 --> 02:18:02.160
 actually came from the neighbors, and we really appreciated all their engagement.

02:18:02.160 --> 02:18:06.640
 And even we had a meeting just a few weeks ago as this was starting to head to P&Z.

02:18:06.640 --> 02:18:10.640
 So the list, I think, was already shown to -- and it's in your packet.

02:18:10.640 --> 02:18:11.640
 I won't belabor that.

02:18:11.640 --> 02:18:13.360
 I'm happy to go back if you'd like.

02:18:13.360 --> 02:18:15.760
 And we just talked about some of the development standards.

02:18:15.760 --> 02:18:21.520
 So I don't want to take any more time, but really, Angie did such a great job with the

02:18:21.520 --> 02:18:22.520
 presentation.

02:18:22.520 --> 02:18:29.200
 So if you could answer any questions, you all might have.

02:18:29.200 --> 02:18:35.160
 Any questions from the commission?

02:18:35.160 --> 02:18:36.160
 Commissioner MacDuff?

02:18:36.160 --> 02:18:41.440
 Yes, I just have a comment, and of course, yes, certainly the staff has done a great

02:18:41.440 --> 02:18:42.440
 job on this.

02:18:42.440 --> 02:18:49.760
 I think this is an exemplary model for use of an overlay plan development.

02:18:49.760 --> 02:18:51.920
 So thank you, Mr. Jacobson, for this.

02:18:51.920 --> 02:18:53.500
 I appreciate that.

02:18:53.500 --> 02:19:06.600
 And certainly a relevant way to address the neighbors' concerns.

02:19:06.600 --> 02:19:08.520
 This is a public hearing.

02:19:08.520 --> 02:19:16.280
 If anyone else would like to come and speak, you're welcome to -- oh, I'm sorry, is this

02:19:16.280 --> 02:19:17.280
 Andrew Belter?

02:19:17.280 --> 02:19:18.280
 Yes, this is Andrew Belter.

02:19:18.280 --> 02:19:22.240
 I'm going to consult an engineer for this, and I'm just here to answer any questions

02:19:22.240 --> 02:19:24.400
 you have on the engineering side of things.

02:19:24.400 --> 02:19:25.400
 Thank you.

02:19:25.400 --> 02:19:26.880
 Appreciate you being here.

02:19:26.880 --> 02:19:29.960
 Any questions for the applicant's engineering representative?

02:19:29.960 --> 02:19:35.840
 I don't see any.

02:19:35.840 --> 02:19:38.280
 Thank you.

02:19:38.280 --> 02:19:40.560
 With that, I will close the public hearing.

02:19:40.560 --> 02:19:42.240
 We have a motion on the board.

02:19:42.240 --> 02:19:43.240
 Commissioner Garland?

02:19:43.240 --> 02:19:51.880
 I would like to make a motion to approve the zoning change as recommended by city staff.

02:19:51.880 --> 02:19:54.160
 Thank you.

02:19:54.160 --> 02:19:55.480
 And Commissioner Ketreson?

02:19:55.480 --> 02:19:57.080
 I second.

02:19:57.080 --> 02:19:59.420
 Commissioner Garland?

02:19:59.420 --> 02:20:00.420
 Thank you.

02:20:00.420 --> 02:20:02.000
 So we have a motion to approve on the board.

02:20:02.000 --> 02:20:05.000
 Any discussion?

02:20:05.000 --> 02:20:11.560
 Yeah, I don't have a problem with this.

02:20:11.560 --> 02:20:21.640
 I'll just say that we should be careful when we describe the list of uses that are stripped

02:20:21.640 --> 02:20:35.360
 out from a -- when we describe the stripped-out uses as more intense, I would not expect multifamily

02:20:35.360 --> 02:20:41.880
 housing to be more intense than a 24-hour automotive fuel sales, for instance.

02:20:41.880 --> 02:20:49.260
 I understand that happens because of negotiations with nearby property owners, but let's just

02:20:49.260 --> 02:20:52.280
 be careful how we message that.

02:20:52.280 --> 02:20:58.960
 Any other questions on the commission?

02:20:58.960 --> 02:20:59.960
 Not seeing any.

02:20:59.960 --> 02:21:08.000
 We'll call for a vote on the board.

02:21:08.000 --> 02:21:09.880
 And the item passes 7-0.

02:21:09.880 --> 02:21:14.000
 Thank you.

02:21:14.000 --> 02:21:24.840
 That brings us to item 6A, the planning and zoning commission matrix.

02:21:24.840 --> 02:21:25.840
 Good evening.

02:21:25.840 --> 02:21:30.660
 With respect to the matrix, I believe we captured all of the recently requested items on there,

02:21:30.660 --> 02:21:34.280
 so we will get to work on addressing those.

02:21:34.280 --> 02:21:37.840
 A couple of council updates for you all.

02:21:37.840 --> 02:21:43.280
 The Comprehensive Plan Amendment that was recently presented at 380 -- along the 380

02:21:43.280 --> 02:21:49.240
 corridor was approved by council, as well as the two recent zoning change requests for

02:21:49.240 --> 02:21:54.000
 Suburban Corridor up at Loop 288 and Sherman.

02:21:54.000 --> 02:21:55.240
 Those were approved as well.

02:21:55.240 --> 02:21:59.640
 And then last night, we were very happy to get a unanimous approval from council for

02:21:59.640 --> 02:22:05.720
 the downtown rezoning, so a great step forward for our Design Downtown Denton plan and its

02:22:05.720 --> 02:22:07.620
 implementation.

02:22:07.620 --> 02:22:12.280
 And then one item I did want to note for everyone, because I don't know if you heard the discussions

02:22:12.280 --> 02:22:17.240
 after the work session, you all received an invitation this evening that was forwarded

02:22:17.240 --> 02:22:22.740
 to the city for an event associated with the landmark development.

02:22:22.740 --> 02:22:27.920
 Because that event is not a public type event that the city can post a notice of possible

02:22:27.920 --> 02:22:32.520
 quorum for, we would ask that you all monitor yourselves if you choose to go and make sure

02:22:32.520 --> 02:22:36.000
 that four of you are not in attendance at the same time at that meeting.

02:22:36.000 --> 02:22:40.520
 So limit it to only three of you should you choose to go to the event, please.

02:22:40.520 --> 02:22:43.440
 And that is all I have.

02:22:43.440 --> 02:22:47.520
 And I believe that event is probably a come and go sort of thing.

02:22:47.520 --> 02:22:58.600
 So just to avoid any extended discussions or roaming quorums, would it be appropriate

02:22:58.600 --> 02:23:04.040
 for us to notify the secretary if we plan to go so that she can monitor if there's an

02:23:04.040 --> 02:23:05.040
 issue?

02:23:05.040 --> 02:23:09.960
 I just, I don't necessarily want to, I'm happy to, but I don't want to suggest that people

02:23:09.960 --> 02:23:13.360
 should contact me if I'm setting up an issue then.

02:23:13.360 --> 02:23:21.640
 I mean, I would say it's a come and go, I don't know, because I've been to some of their

02:23:21.640 --> 02:23:28.640
 events when they opened up like Pecan Square, Treeline, sometimes they say a few words and

02:23:28.640 --> 02:23:29.880
 they talk about things.

02:23:29.880 --> 02:23:36.360
 So I mean, it is four to seven, that's three hours, that is a long event, but I don't,

02:23:36.360 --> 02:23:37.760
 it could go either way.

02:23:37.760 --> 02:23:38.760
 Okay.

02:23:38.760 --> 02:23:43.720
 Sure, so yes, if you all do want to email myself or Kathy, we can let you know if we

02:23:43.720 --> 02:23:46.480
 hear from more than three who plan to attend.

02:23:46.480 --> 02:23:49.660
 And in that instance, I would just ask that those of you that are present kind of coordinate

02:23:49.660 --> 02:23:53.040
 amongst yourselves to see who would be willing to step out.

02:23:53.040 --> 02:23:54.040
 Thank you.

02:23:54.040 --> 02:23:56.240
 I appreciate that.

02:23:56.240 --> 02:24:03.560
 Any items to add to the matrix from the commission?

02:24:03.560 --> 02:24:07.800
 Seeing none, that brings us to item seven, concluding items.

02:24:07.800 --> 02:24:15.240
 Any concluding items to remind us of?

02:24:15.240 --> 02:24:25.840
 I have one, early voting, I believe, is going on now until through Saturday the 30th.

02:24:25.840 --> 02:24:29.360
 I'm going to mess this up, I should have booked this up, I apologize.

02:24:29.360 --> 02:24:32.200
 Somebody who's more civic than me, tell me what the right thing is.

02:24:32.200 --> 02:24:42.440
 I believe it's through next Friday, through the 31st of October, and then election day

02:24:42.440 --> 02:24:45.680
 is on November 4th.

02:24:45.680 --> 02:24:52.080
 So do your duty and privilege as you may.

02:24:52.080 --> 02:24:57.160
 Seeing nothing else, I will adjourn our meeting of the Planning and Zoning Commission.

02:24:57.160 --> 02:24:58.160
 Thank you everyone.

02:24:58.160 --> 02:24:59.280
 At seven, eight.