1 00:00:00,000 --> 00:00:12,440 Good afternoon at 4.31 p.m. this Wednesday, October 22nd, 2025, I will call this meeting 2 00:00:12,440 --> 00:00:16,920 of the work session for the City of Denton Planning and Zoning Commission to order with 3 00:00:16,920 --> 00:00:20,120 a quorum present. 4 00:00:20,120 --> 00:00:26,000 Our first item is any citizen comments on the consent agenda. 5 00:00:26,000 --> 00:00:30,600 I don't see anyone wishing to speak on those. 6 00:00:30,600 --> 00:00:35,920 Next we have clarification for items on the agenda. 7 00:00:35,920 --> 00:00:41,720 Any questions on the item, on the consent agenda from the commission members? 8 00:00:41,720 --> 00:00:46,880 No, okay. 9 00:00:46,880 --> 00:00:55,760 Individual consideration items, there were one update here. 10 00:00:55,760 --> 00:00:59,640 Any questions on the calendar? 11 00:00:59,640 --> 00:01:09,880 Staff does a pretty good job of this, but sometimes we've caught a few things. 12 00:01:09,880 --> 00:01:19,600 Okay, let's go ahead and take a look at the consent, I mean, individual consideration 13 00:01:19,600 --> 00:01:24,720 item, first one. 14 00:01:24,720 --> 00:01:28,640 The plat, correct? 15 00:01:28,640 --> 00:01:33,520 Yes, sorry. 16 00:01:33,520 --> 00:01:36,680 Good afternoon, Angie Manglars, Assistant Planning Director. 17 00:01:36,680 --> 00:01:41,760 This is a final plat for the reserve at Brush Creek. 18 00:01:41,760 --> 00:01:45,680 It is a plan development with the base zoning of R4. 19 00:01:45,680 --> 00:01:50,320 At this time, this final plat is not meeting our criteria for approval. 20 00:01:50,320 --> 00:01:55,400 Staff is recommending denial, but does not have any objection to the request of extension, 21 00:01:55,400 --> 00:01:57,920 which could be granted to November 17th. 22 00:01:57,920 --> 00:02:02,560 This would be their second extension request, and I'm happy to answer any questions you 23 00:02:02,560 --> 00:02:05,920 all may have. 24 00:02:05,920 --> 00:02:06,920 Any questions? 25 00:02:06,920 --> 00:02:10,280 I don't see any, thank you. 26 00:02:10,280 --> 00:02:18,840 Then the second item, 4C, FR250020, good afternoon, Julie. 27 00:02:18,840 --> 00:02:28,360 I'm presenting FR250020, it is a replat of the Eden Village development located just 28 00:02:28,360 --> 00:02:32,120 on the west side of Loop 288, south of Audra. 29 00:02:32,120 --> 00:02:35,840 It is a fourplex development, triplex and fourplex development. 30 00:02:35,840 --> 00:02:41,560 They have addressed all of staff's comments, so I don't know if you received that email 31 00:02:41,560 --> 00:02:47,240 this afternoon, but staff modified their recommendation to approval, and I will be happy to answer 32 00:02:47,240 --> 00:02:48,960 any questions. 33 00:02:48,960 --> 00:02:51,840 Any questions on this? 34 00:02:51,840 --> 00:02:57,960 The updated plat was sent by email, so okay, I don't see anything, thank you, Julie. 35 00:02:57,960 --> 00:03:05,160 Brings us to our public hearings, item 5A, HL250002. 36 00:03:05,160 --> 00:03:13,440 Good afternoon, Cameron Robertson, Historic Preservation Officer. 37 00:03:13,440 --> 00:03:17,540 For many of y'all, this is the first time you're seeing a historic landmark designation 38 00:03:17,540 --> 00:03:21,720 come through, so I just wanted to do a brief education portion, and then I'll go into my 39 00:03:21,720 --> 00:03:22,720 summary slide. 40 00:03:22,720 --> 00:03:27,320 Just to give you all some background of what a historic landmark is defined as within the 41 00:03:27,320 --> 00:03:31,960 city of Denton, it is officially recognized by the city for its outstanding architectural, 42 00:03:31,960 --> 00:03:37,320 archaeological, cultural, social, economic, political, historical significance, so it 43 00:03:37,320 --> 00:03:39,000 can be any one of those things. 44 00:03:39,000 --> 00:03:44,640 Presently, the city of Denton does have 68 local historic landmark designations, three 45 00:03:44,640 --> 00:03:50,120 of those which actually came forward to the P&Z during 2024. 46 00:03:50,120 --> 00:03:53,600 It is a zoning action, so it is a three-step process. 47 00:03:53,600 --> 00:03:57,400 It has already gone to the Historic Landmark Commission, it is now coming forward to the 48 00:03:57,400 --> 00:04:03,280 Planning and Zoning Commission, and then it will later go to the city council. 49 00:04:03,280 --> 00:04:08,560 Just some benefits of historic landmark designations, it does appreciate a greater rate. 50 00:04:08,560 --> 00:04:12,560 Staff has actually done research for this, and it is true, a lot of the times people 51 00:04:12,560 --> 00:04:15,840 hear that it's rumor, but it's actually the case. 52 00:04:15,840 --> 00:04:20,400 It is eligible for a local historic tax exemption here in Denton, and there's also that visible 53 00:04:20,400 --> 00:04:23,040 recognition of the plaque on the property. 54 00:04:23,040 --> 00:04:28,520 It does also encourage better design, as sometimes, depending on the work that's being done, the 55 00:04:28,520 --> 00:04:31,920 Historic Landmark Commission does review those projects. 56 00:04:31,920 --> 00:04:40,200 It protects from swift demolition, and then it also increases community pride and awareness. 57 00:04:40,200 --> 00:04:45,640 The request for this evening is a historic landmark designation for 3316 Roselon Drive. 58 00:04:45,640 --> 00:04:51,240 It does meet approval criteria 359 and 11 from our Denton Development Code. 59 00:04:51,240 --> 00:04:54,200 It is the zoning of R4, so that residential zoning. 60 00:04:54,200 --> 00:05:01,280 It meets our goal CC2 of the Denton 2040 Comprehensive Plan, as well as goal number one, policy 1.3 61 00:05:01,280 --> 00:05:06,400 of our 2019 Historic Preservation Plan, so staff is recommending approval, as it does 62 00:05:06,400 --> 00:05:15,280 apply with the criteria from the Denton Development Code, as well as our two individual plans. 63 00:05:15,280 --> 00:05:17,760 Any questions on this item? 64 00:05:17,760 --> 00:05:19,760 Commissioner MacDuff? 65 00:05:19,760 --> 00:05:26,600 Yes, I'm concerned that this was one of the founders of the Lions Club in Denton, and 66 00:05:26,600 --> 00:05:29,560 so I just wanted to get that out there. 67 00:05:29,560 --> 00:05:31,440 You know, that's of concern to me. 68 00:05:31,440 --> 00:05:35,800 Not really a concern, but I appreciate putting it in there and giving us a perspective and 69 00:05:35,800 --> 00:05:37,320 historical perspective on that. 70 00:05:37,320 --> 00:05:46,360 My question is, did the owners come to you to make this request, and this was owner driven? 71 00:05:46,360 --> 00:05:47,360 Yes. 72 00:05:47,360 --> 00:05:52,920 In the e-commit that we had today, there were several, one of the neighbors said there were 73 00:05:52,920 --> 00:05:57,960 some other houses in that same circle that could qualify as well on Roselon. 74 00:05:57,960 --> 00:06:00,120 That was an interesting point. 75 00:06:00,120 --> 00:06:04,280 Original four home locations that came in late, so it caught my eye. 76 00:06:04,280 --> 00:06:13,880 But are there cases where the city identifies homes that might qualify for historical designations? 77 00:06:13,880 --> 00:06:14,920 That's a great question. 78 00:06:14,920 --> 00:06:20,560 So each month in front of the Historic Landmark Commission, the staff does bring forward a 79 00:06:20,560 --> 00:06:25,000 reoccurring item where the Historic Landmark Commission can bring forward properties that 80 00:06:25,000 --> 00:06:30,720 they believe are eligible for historic designation at the local level. 81 00:06:30,720 --> 00:06:35,560 If everyone on the commission does agree that it needs to be added to the list, then staff, 82 00:06:35,560 --> 00:06:40,080 myself as a historic preservation officer, sends a letter of designation interest to 83 00:06:40,080 --> 00:06:44,660 the property owner, and then the property owner usually at that point tells staff whether 84 00:06:44,660 --> 00:06:50,440 or not they want to pursue it, or they usually ask for additional information, at which point 85 00:06:50,440 --> 00:06:54,800 staff does additional education and training, and then they can decide whether or not they 86 00:06:54,800 --> 00:06:57,040 want to pursue the designation. 87 00:06:57,040 --> 00:07:01,760 Is that on a cycle, or do you all do that on a cycle, where you identify? 88 00:07:01,760 --> 00:07:08,400 It's just each month, if HLC brings forward a property that they're interested in designating. 89 00:07:08,400 --> 00:07:09,400 Thank you. 90 00:07:09,400 --> 00:07:10,400 Anything else? 91 00:07:10,400 --> 00:07:13,520 I don't see anything. 92 00:07:13,520 --> 00:07:15,800 Thank you very much, Cameron. 93 00:07:15,800 --> 00:07:26,360 It brings us to second public hearing, PDA 0002. 94 00:07:26,360 --> 00:07:32,840 Good evening, Julie Wyatt. 95 00:07:32,840 --> 00:07:40,100 So tonight I'm presenting PDA 25-2, it's for a charter school. 96 00:07:40,100 --> 00:07:43,520 Just a quick summary of the proposal. 97 00:07:43,520 --> 00:07:47,880 So this is in Plan Development 139, it's about 15 acres. 98 00:07:47,880 --> 00:07:53,600 It's located on the south side of Vintage, east of 35W. 99 00:07:53,600 --> 00:07:59,280 The PD was approved in 1991, so it's one of our older PDs in the city. 100 00:07:59,280 --> 00:08:03,760 And the purpose of the request tonight is to modify an approved site plan for the charter 101 00:08:03,760 --> 00:08:04,760 school. 102 00:08:04,760 --> 00:08:13,120 In 2020, the school came to the city and went through this process to lay out the site. 103 00:08:13,120 --> 00:08:18,320 They have made some changes to their site plan, including removing about four and a 104 00:08:18,320 --> 00:08:23,960 half acres from the north side of the site, reducing the building footprint and open space. 105 00:08:23,960 --> 00:08:29,440 They are removing the high school for the time being, and then reconfiguring the parking 106 00:08:29,440 --> 00:08:30,440 and access. 107 00:08:30,440 --> 00:08:33,720 So really it is just related to that site plan. 108 00:08:33,720 --> 00:08:40,200 Staff does recommend approval of the proposal as it does meet the criteria for approval, 109 00:08:40,200 --> 00:08:45,200 and I will be happy to answer any questions. 110 00:08:45,200 --> 00:08:47,360 Commissioner Dyer? 111 00:08:47,360 --> 00:08:55,000 I'm going to assume that the applicant is obviously aware of the apartments in the new 112 00:08:55,000 --> 00:09:00,120 travel gas station area that's going to be there, and they must, I'm assuming they must 113 00:09:00,120 --> 00:09:01,880 be okay with that. 114 00:09:01,880 --> 00:09:07,800 Having, you know, putting a school next to that, like does that, any of our planning 115 00:09:07,800 --> 00:09:12,200 and zoning, like the buffers and things like that, does that conflict with it? 116 00:09:12,200 --> 00:09:15,760 I mean, I know you were recommending, so everything must be good, right? 117 00:09:15,760 --> 00:09:20,600 It meets all setback requirements and buffering requirements. 118 00:09:20,600 --> 00:09:26,080 The apartments are there, so they are aware of that, and then they have been communicating 119 00:09:26,080 --> 00:09:34,040 and regarding the other elements to the PD and that commercial use. 120 00:09:34,040 --> 00:09:39,420 They went through the TIA process because they did a TIA in 2020, but a lot's changed 121 00:09:39,420 --> 00:09:42,640 in the area, the multifamily and the commercial. 122 00:09:42,640 --> 00:09:48,480 That's why I asked the question, because 2020, that's five years ago, and those items, you 123 00:09:48,480 --> 00:09:53,280 know, the apartments and the travel center may not have been on the horizon then. 124 00:09:53,280 --> 00:09:58,220 That is exactly right, and so that's why we had them update that TIA to bring in that 125 00:09:58,220 --> 00:10:00,240 additional background traffic. 126 00:10:00,240 --> 00:10:03,720 Does that answer your question? 127 00:10:03,720 --> 00:10:04,720 Is that good? 128 00:10:04,720 --> 00:10:05,720 Okay, good. 129 00:10:05,720 --> 00:10:06,720 Anything else? 130 00:10:06,720 --> 00:10:07,720 I don't see anything else. 131 00:10:07,720 --> 00:10:08,720 Thank you, Julie. 132 00:10:08,720 --> 00:10:09,720 All right. 133 00:10:09,720 --> 00:10:10,720 Thank you. 134 00:10:10,720 --> 00:10:28,080 That brings us to our last public hearing tonight, PD250004. 135 00:10:28,080 --> 00:10:29,080 Hello again. 136 00:10:29,080 --> 00:10:30,080 Angie Manglaris. 137 00:10:30,080 --> 00:10:34,160 This is PD250004, Brush Creek Center. 138 00:10:34,160 --> 00:10:36,400 Want to give a little bit of context on this one. 139 00:10:36,400 --> 00:10:41,080 We just talked about the reserve at Brush Creek Final Platt, so this is a request for 140 00:10:41,080 --> 00:10:45,360 a rezoning that is the remainder of that overall parent tract. 141 00:10:45,360 --> 00:10:51,320 The subject property today is located at the intersection of Brush Creek and US377, two 142 00:10:51,320 --> 00:10:52,320 primary arterials. 143 00:10:52,320 --> 00:10:58,640 It is currently zoned Residential 1, and they are requesting to rezone to Plan Development 144 00:10:58,640 --> 00:11:00,360 Suburban Corridor. 145 00:11:00,360 --> 00:11:07,040 It's 2.63 acres of land, and really the purpose of the PD overlay is to provide additional 146 00:11:07,040 --> 00:11:12,960 use restrictions and development standards to ensure compatibility in the area. 147 00:11:12,960 --> 00:11:17,360 Initially, the Brush Creek project actually did come in as one zoning request for the 148 00:11:17,360 --> 00:11:21,500 residential portion and the suburban corridor portion, and the Planning and Zoning Commission 149 00:11:21,500 --> 00:11:27,560 in 2023 remanded it back to the applicant to take a closer look at what could be done, 150 00:11:27,560 --> 00:11:31,440 including buffers and use standards, and so the applicant came back, or they came back 151 00:11:31,440 --> 00:11:36,120 in two different waves, first the residential and now the commercial remainder. 152 00:11:36,120 --> 00:11:39,480 So overall, this does comply with our criteria for approval. 153 00:11:39,480 --> 00:11:44,360 It is consistent with the Comprehensive Plan and that neighborhood mixed use designation. 154 00:11:44,360 --> 00:11:47,800 Staff is recommending approval, and I do have a longer presentation to go through during 155 00:11:47,800 --> 00:11:52,320 regular session, but I'm happy to answer any questions you all may have now. 156 00:11:52,320 --> 00:12:01,000 Any questions? Commissioner MacDuff? Yes, what were the neighbors' concerns when 157 00:12:01,000 --> 00:12:05,040 this first went through, and then we opted for an overlay plan development? 158 00:12:05,040 --> 00:12:11,640 Sure, so when this first came through in 2023, it was for the entire 18-acre tract. 159 00:12:11,640 --> 00:12:16,200 Approximately 15 acres of those were residential, and primarily along this -- I mean, you can 160 00:12:16,200 --> 00:12:19,880 see here what is now designated as PDR 4. 161 00:12:19,880 --> 00:12:23,880 They were requesting, I believe it was an R6 zoning district at that time, which was 162 00:12:23,880 --> 00:12:28,200 a little bit more dense than what is found in the ETJ as you continue to travel east 163 00:12:28,200 --> 00:12:29,720 on Brush Creek Road. 164 00:12:29,720 --> 00:12:33,320 So a lot of the concerns were related to that new residential use and some of the buffering 165 00:12:33,320 --> 00:12:35,800 between existing homes and new homes. 166 00:12:35,800 --> 00:12:40,240 So the applicant came back last year with a PDE for that residential portion. 167 00:12:40,240 --> 00:12:44,080 The zoning district was residential R4 with a slightly larger lot size than what you would 168 00:12:44,080 --> 00:12:48,760 see under today's R4 or standard R4 and some additional buffering. 169 00:12:48,760 --> 00:12:53,140 They did choose to leave that commercial corner out, have had several neighborhood meetings. 170 00:12:53,140 --> 00:12:55,400 Some of the concerns were what uses could be allowed there. 171 00:12:55,400 --> 00:12:59,880 They are requesting suburban corridor, which does allow for some more intensive uses. 172 00:12:59,880 --> 00:13:05,080 It is designed to be along roadways like Fort Worth Drive, a more high-traffic corridor. 173 00:13:05,080 --> 00:13:09,120 And so by way of this PDE overlay, the applicant is restricting approximately -- I think it's 174 00:13:09,120 --> 00:13:14,040 15 uses, and those are typically the more intensive uses that are allowed on suburban 175 00:13:14,040 --> 00:13:15,360 corridor. 176 00:13:15,360 --> 00:13:19,800 So it reduces some of those incompatibilities by ensuring those more intensive land uses 177 00:13:19,800 --> 00:13:20,800 can't go in. 178 00:13:20,800 --> 00:13:21,800 >> Okay. 179 00:13:21,800 --> 00:13:22,800 Any other questions? 180 00:13:22,800 --> 00:13:23,800 I don't see any. 181 00:13:23,800 --> 00:13:24,800 Thank you. 182 00:13:24,800 --> 00:13:41,720 That brings us to our work sessions for this afternoon. 183 00:13:41,720 --> 00:13:52,360 First item is 3A, PZ25-189, report, discussion, and suggestions or recommendations on the 184 00:13:52,360 --> 00:14:03,920 City of Denton criteria design criteria manual update. 185 00:14:03,920 --> 00:14:04,920 >> Good afternoon. 186 00:14:04,920 --> 00:14:09,600 I'm Brett Bourgeois, the City Engineer, and I'm here today to talk to you about our proposed 187 00:14:09,600 --> 00:14:14,120 changes to the design criteria manual for the City of Denton. 188 00:14:14,120 --> 00:14:15,120 So quick overview. 189 00:14:15,120 --> 00:14:20,140 I know a lot of you are new, first time going through this process, so we have an outreach 190 00:14:20,140 --> 00:14:23,880 plan that we like to do, kind of go through the background of what the criteria manuals 191 00:14:23,880 --> 00:14:27,640 are, discuss some of the highlights of the updates that we're proposing and what our 192 00:14:27,640 --> 00:14:28,640 next steps are. 193 00:14:28,640 --> 00:14:33,000 These are very technical documents that are used to design all the different infrastructure 194 00:14:33,000 --> 00:14:34,240 for the city. 195 00:14:34,240 --> 00:14:38,900 So with that in mind, we have a whole staff of technical experts from the city on hand 196 00:14:38,900 --> 00:14:43,800 to answer any questions that you may have that I cannot answer myself. 197 00:14:43,800 --> 00:14:47,400 So the first thing we want to do is kind of discuss our public outreach plan. 198 00:14:47,400 --> 00:14:51,840 It's a very lengthy process because we're impacting not only capital projects, but also 199 00:14:51,840 --> 00:14:52,840 development projects. 200 00:14:52,840 --> 00:14:57,880 We need buy-in from all the different boards and commissions, and so we started this process 201 00:14:57,880 --> 00:14:58,880 off in September. 202 00:14:58,880 --> 00:15:03,080 We sent a notice out to the development community that we are starting this revisions to our 203 00:15:03,080 --> 00:15:04,080 criteria manual. 204 00:15:04,080 --> 00:15:08,920 Today, or this morning, we had a developer town hall where we presented some of the highlights 205 00:15:08,920 --> 00:15:09,920 of the revisions. 206 00:15:09,920 --> 00:15:14,440 We're here today to present to you some of those highlights as well. 207 00:15:14,440 --> 00:15:19,440 On Friday, we'll be posting the revised document online to solicit public comment and feedback 208 00:15:19,440 --> 00:15:23,320 from the development community and other engineering communities. 209 00:15:23,320 --> 00:15:27,800 In November, we'll be presenting to the Texas Society of Professional Engineers, as well 210 00:15:27,800 --> 00:15:32,320 as publishing in the newspaper for a public hearing for the adoption of it. 211 00:15:32,320 --> 00:15:38,200 We'll go to Mobility Committee, BUB, and then finally City Council in December with an effective 212 00:15:38,200 --> 00:15:40,600 date, planned effective date of January 1st. 213 00:15:40,600 --> 00:15:48,800 So it's kind of a big push to get all the information out of what we're proposing. 214 00:15:48,800 --> 00:15:51,040 So a little background on how we do this. 215 00:15:51,040 --> 00:15:56,080 So the criteria manuals touch many departments, if not all departments within the city. 216 00:15:56,080 --> 00:15:59,760 So we had a series of meetings in September where we brought together representatives 217 00:15:59,760 --> 00:16:03,520 from all the different departments, directors, and their technical staff. 218 00:16:03,520 --> 00:16:06,840 We walked through all the proposed, all the criteria manuals. 219 00:16:06,840 --> 00:16:11,320 We had, throughout the year and the course of the time, we collect comments from the 220 00:16:11,320 --> 00:16:14,580 different departments and different community that we keep track of. 221 00:16:14,580 --> 00:16:15,580 We've made all those edits. 222 00:16:15,580 --> 00:16:19,080 We said this is what it would look like, based on all the comments you'll have. 223 00:16:19,080 --> 00:16:20,080 Let's talk about it. 224 00:16:20,080 --> 00:16:23,760 Let's go through these comments, see ones that work or are conflict with each other. 225 00:16:23,760 --> 00:16:27,240 So a series of those meetings. 226 00:16:27,240 --> 00:16:29,400 We got a draft document together. 227 00:16:29,400 --> 00:16:33,560 Now we are going out for public comment with that draft document and then we're doing all 228 00:16:33,560 --> 00:16:37,480 the public outreach, posting online newspaper articles, and then we're going to bring it 229 00:16:37,480 --> 00:16:43,960 to all the boards and commissions and city council for public hearing and adoption. 230 00:16:43,960 --> 00:16:46,720 The city of Denton has multiple governing documents. 231 00:16:46,720 --> 00:16:49,520 So there is a hierarchy to these governing documents. 232 00:16:49,520 --> 00:16:55,140 The top document is the Denton Development Code that sets all the regulations and policies 233 00:16:55,140 --> 00:17:01,160 and procedures for zoning, subdivisions, different regulations, et cetera. 234 00:17:01,160 --> 00:17:04,520 Once that's mainly what you guys all see right with all the planners bringing all that stuff 235 00:17:04,520 --> 00:17:05,520 forward. 236 00:17:05,520 --> 00:17:08,920 Once all that's been approved, they go into design and that's where our design document 237 00:17:08,920 --> 00:17:12,120 comes in where we say this is the type of pipe you need to have. 238 00:17:12,120 --> 00:17:13,480 This is the slope we need it to be. 239 00:17:13,480 --> 00:17:18,360 This is what you need to consider for your traffic, for your whatever it is. 240 00:17:18,360 --> 00:17:23,000 So we go into a much more technical side of the document, the design process. 241 00:17:23,000 --> 00:17:27,800 Beyond that, when we go to construction, we have what are called construction specifications. 242 00:17:27,800 --> 00:17:32,200 We maintain those as well that says, okay, well, this is how you actually build it now. 243 00:17:32,200 --> 00:17:33,680 This is the way you're supposed to install it. 244 00:17:33,680 --> 00:17:35,700 This is the way that it's supposed to be checked. 245 00:17:35,700 --> 00:17:39,640 This is the standards of the materials that we need to meet, all that kind of technical 246 00:17:39,640 --> 00:17:40,640 information. 247 00:17:40,640 --> 00:17:45,560 And then we also have and maintain a standard set of standard details which show how they're 248 00:17:45,560 --> 00:17:46,920 actually supposed to construct it. 249 00:17:46,920 --> 00:17:52,940 So we have guidance, we have requirements, we have technical guidance, and we also have 250 00:17:52,940 --> 00:17:56,840 graphical pictures of how it's actually supposed to be installed and constructed. 251 00:17:56,840 --> 00:17:58,040 So all these documents work together. 252 00:17:58,040 --> 00:18:02,720 They all kind of touch different aspects of the development or of a project life cycle. 253 00:18:02,720 --> 00:18:09,480 And so the one that we're talking about today is the criteria manual, second one down. 254 00:18:09,480 --> 00:18:12,920 So getting to some of the quick highlights. 255 00:18:12,920 --> 00:18:17,040 The Solid Waste Criteria Manual only had one revision this year, it's looking at having 256 00:18:17,040 --> 00:18:21,280 side load for their enclosures for the properties that they have restrictions, they can't get 257 00:18:21,280 --> 00:18:22,280 in front load. 258 00:18:22,280 --> 00:18:24,080 They removed that a few years ago. 259 00:18:24,080 --> 00:18:27,600 They found that they do have restrictions on some properties still, so we need to get 260 00:18:27,600 --> 00:18:33,960 that flexibility for developments that have side load for their garbage collection. 261 00:18:33,960 --> 00:18:37,800 For the Stormwater Criteria Manual, we received a lot of feedback from the development community 262 00:18:37,800 --> 00:18:40,680 about why do we only use reinforced concrete pipe? 263 00:18:40,680 --> 00:18:43,240 Why don't we allow other products? 264 00:18:43,240 --> 00:18:47,800 We did a series of brought in vendors with their products. 265 00:18:47,800 --> 00:18:52,520 We talked to other municipalities, we went and saw them and saw how they install it, 266 00:18:52,520 --> 00:18:54,600 how they operate, got their feedback on it. 267 00:18:54,600 --> 00:18:59,200 And after a series of conversations and meetings, we decided to allow polypropylene pipe, which 268 00:18:59,200 --> 00:19:02,280 is an alternative to reinforced concrete. 269 00:19:02,280 --> 00:19:08,160 This we hope will drive the lower costs overall, because now there's competition in the marketplace. 270 00:19:08,160 --> 00:19:12,760 Polypropylene pipe is generally less expensive than reinforced concrete, and we feel very 271 00:19:12,760 --> 00:19:16,840 confident it's going to be an equally good product. 272 00:19:16,840 --> 00:19:20,840 Then also one of the other revisions that we have this year is that last round we went 273 00:19:20,840 --> 00:19:28,040 through, we recommended improvements for larger developments over one acre in size, we asked 274 00:19:28,040 --> 00:19:32,840 them to consider treating the water quality of the runoff separately. 275 00:19:32,840 --> 00:19:36,520 So we have detention, then we have water quality, so we have a flood protection and then a water 276 00:19:36,520 --> 00:19:40,080 quality aspect, before everything was all combined together. 277 00:19:40,080 --> 00:19:45,480 We recommended last revision, hey, start considering these two things separately, because that's 278 00:19:45,480 --> 00:19:50,720 the regional requirement with I-SWEM, and that's the direction the EPA is going with 279 00:19:50,720 --> 00:19:56,080 the federal requirements, and we have an MS4 permit with the federal government that we 280 00:19:56,080 --> 00:19:58,840 need to match EPA requirements. 281 00:19:58,840 --> 00:20:01,040 So we put this out of the recommendation. 282 00:20:01,040 --> 00:20:04,240 Now we're coming around saying, okay, this is now going to be a requirement, it's going 283 00:20:04,240 --> 00:20:08,440 to put us in line with the regional guidance and in line with the future EPA update. 284 00:20:08,440 --> 00:20:11,920 So we're just kind of getting a little bit ahead of the horse, a little bit ahead of 285 00:20:11,920 --> 00:20:17,480 the curve, but we're in line with the regional requirements there. 286 00:20:17,480 --> 00:20:21,960 The transportation criteria manual had a pretty big revision this year. 287 00:20:21,960 --> 00:20:23,920 We added some new roadway collections. 288 00:20:23,920 --> 00:20:27,640 We did some discussion on how to handle school areas. 289 00:20:27,640 --> 00:20:31,480 We removed the bike ped traffic impact analysis that we added a couple of years ago, a couple 290 00:20:31,480 --> 00:20:36,040 of revisions ago, mainly because it's not industry standard and no one really knew how 291 00:20:36,040 --> 00:20:38,520 to apply and how to effectively use it. 292 00:20:38,520 --> 00:20:42,880 It was something we created to see if we can improve bike ped access. 293 00:20:42,880 --> 00:20:43,880 We can do that other way. 294 00:20:43,880 --> 00:20:44,880 So we took that out. 295 00:20:44,880 --> 00:20:49,680 It was just a conflicting requirement and our criteria, and we updated other sections 296 00:20:49,680 --> 00:20:56,400 on on-street parking and traffic calming measures. 297 00:20:56,400 --> 00:21:00,840 For the water waste water, we had a pretty big overhaul, not on the technical side, but 298 00:21:00,840 --> 00:21:03,040 of the readability and the organization of it. 299 00:21:03,040 --> 00:21:07,880 So a lot of the edits are mainly just changing how the document is read and the order of 300 00:21:07,880 --> 00:21:08,880 things. 301 00:21:08,880 --> 00:21:10,680 It's mostly the same technical side. 302 00:21:10,680 --> 00:21:14,960 On the technical stuff that did change is that we are asking for geotechnical reports 303 00:21:14,960 --> 00:21:17,760 and we're asking for cathodic protection design. 304 00:21:17,760 --> 00:21:22,620 So soils have corrosive materials, it degrades pipe over time. 305 00:21:22,620 --> 00:21:26,760 You can put a cathodic protection on that extends the life of the like the metal ductile 306 00:21:26,760 --> 00:21:27,800 iron pipes, et cetera. 307 00:21:27,800 --> 00:21:30,160 So we've asked for that to be included in the requirements. 308 00:21:30,160 --> 00:21:36,240 We've also did some lift station improvements to provide better design site design requirements 309 00:21:36,240 --> 00:21:39,640 for lift stations. 310 00:21:39,640 --> 00:21:43,680 For the street lights, one of the things that we we did, we added a new street light pole 311 00:21:43,680 --> 00:21:45,480 that was asked for by the developers. 312 00:21:45,480 --> 00:21:50,720 We included that in here and we also have clarified the process for adding and removing 313 00:21:50,720 --> 00:21:57,240 street lighting and then we also added a new section to the criteria manual this year, 314 00:21:57,240 --> 00:21:59,600 one on the environmentally sensitive areas. 315 00:21:59,600 --> 00:22:05,120 This is information that was mainly stored just in staff's brains and made it hard if 316 00:22:05,120 --> 00:22:06,840 we ever have staff turnover. 317 00:22:06,840 --> 00:22:09,800 We don't have a clear way to have this written out, so we went through and we wrote this 318 00:22:09,800 --> 00:22:14,760 all out, how to identify an environmentally sensitive area, how to treat it, how to design 319 00:22:14,760 --> 00:22:16,160 for it, what you have to do. 320 00:22:16,160 --> 00:22:21,680 So that was a whole new section that was added to the criteria manual this year. 321 00:22:21,680 --> 00:22:27,760 Again, this slide is actually old as of this morning because we did finish the internal 322 00:22:27,760 --> 00:22:31,680 revisions so that's where we're going to be posting it online on Friday. 323 00:22:31,680 --> 00:22:34,400 We are asking for public feedback. 324 00:22:34,400 --> 00:22:37,220 We are going to be presenting to all these different agencies. 325 00:22:37,220 --> 00:22:41,120 The next one up is going to be the Texas Society of Professional Engineers, which is a professional 326 00:22:41,120 --> 00:22:45,240 organization of engineers and then we're going to all the different boards and committees 327 00:22:45,240 --> 00:22:50,640 with an adoption of effective date of January 1st as our goal. 328 00:22:50,640 --> 00:22:53,000 I'll stand for any questions. 329 00:22:53,000 --> 00:23:00,600 This is the first time since a few new members, so I'll just let everybody know that this 330 00:23:00,600 --> 00:23:05,080 is one of my favorite work sessions of the year, if you can imagine so. 331 00:23:05,080 --> 00:23:08,400 This is where the rubber meets the road, I'll put it that way. 332 00:23:08,400 --> 00:23:09,760 Commissioner McDuff? 333 00:23:09,760 --> 00:23:14,400 I figured we'd hear from you first. 334 00:23:14,400 --> 00:23:21,080 Well, this is a lot of engineer speak, but I do understand it conceptually and I appreciate 335 00:23:21,080 --> 00:23:26,000 the importance of it and the thoroughness of your staff and you, sir. 336 00:23:26,000 --> 00:23:27,520 We certainly do. 337 00:23:27,520 --> 00:23:35,200 I guess if we could go back to that, the continuum, how this relates to the development codes, 338 00:23:35,200 --> 00:23:41,640 that slide and I'm going to just ask a question, would the comprehensive plan be the block 339 00:23:41,640 --> 00:23:42,640 to the left? 340 00:23:42,640 --> 00:23:47,760 Yes, it would probably be one of the guiding document that leads to the development codes. 341 00:23:47,760 --> 00:23:51,800 That would be another block above the comprehensive plan, correct? 342 00:23:51,800 --> 00:23:53,600 Okay, excellent, excellent. 343 00:23:53,600 --> 00:23:59,600 My other comment, just in general, how does this translate, this document, if you could 344 00:23:59,600 --> 00:24:06,480 just give an overall answer, how does this translate to the quality of life for our citizens? 345 00:24:06,480 --> 00:24:15,360 It provides long lasting infrastructure that increases the effectiveness of government 346 00:24:15,360 --> 00:24:16,360 funds. 347 00:24:16,360 --> 00:24:22,240 We're looking for having good quality of life, long lasting infrastructure that is good steward 348 00:24:22,240 --> 00:24:24,760 of government funds to ensure public safety. 349 00:24:24,760 --> 00:24:30,200 I might include that in here in one of the opening paragraphs. 350 00:24:30,200 --> 00:24:39,120 I was interested in reading that and then just from what the work, if I may, Chair Pruitt, 351 00:24:39,120 --> 00:24:43,320 I want to get my comments in before you launch off. 352 00:24:43,320 --> 00:24:48,560 I'd like for us to focus on the ESA, I'm proud of us for putting that in there. 353 00:24:48,560 --> 00:24:54,400 We've talked about that point in every proposal that we've considered because it's important 354 00:24:54,400 --> 00:25:01,240 with all the growth, the environment's important to all of us and so I certainly appreciate 355 00:25:01,240 --> 00:25:03,440 having that in there. 356 00:25:03,440 --> 00:25:11,880 It's four feet, I'm going to ask a specific question, is four feet the distance from, 357 00:25:11,880 --> 00:25:13,520 tell me what the four feet is. 358 00:25:13,520 --> 00:25:17,160 Is that just a standard measurement? 359 00:25:17,160 --> 00:25:21,440 It says it should not, the protective fencing and then it talks about a minimum of four 360 00:25:21,440 --> 00:25:22,560 feet. 361 00:25:22,560 --> 00:25:26,560 Four feet is included several spots. 362 00:25:26,560 --> 00:25:28,440 I do not have the answer off the top of my head. 363 00:25:28,440 --> 00:25:33,080 We can get the response back to you on that with our technical expert in the environmental 364 00:25:33,080 --> 00:25:35,600 side. 365 00:25:35,600 --> 00:25:42,360 I was just trying to think what size four feet is, not too big, maybe six feet might be better 366 00:25:42,360 --> 00:25:46,520 but it seems a little short. 367 00:25:46,520 --> 00:25:50,520 I can only speculate, I'm not the expert on that field so I can definitely get a comment 368 00:25:50,520 --> 00:25:53,040 back to you or written response back to you if that works. 369 00:25:53,040 --> 00:25:56,960 Sure, we're very interested in that and I think as a commission it's come up several 370 00:25:56,960 --> 00:25:57,960 times. 371 00:25:57,960 --> 00:25:58,960 Understandable. 372 00:25:58,960 --> 00:25:59,960 Thank you. 373 00:25:59,960 --> 00:26:06,440 Yes, Commissioner Riggs? 374 00:26:06,440 --> 00:26:11,680 So we were actually discussing that in the DCRC, the four foot, and my understanding 375 00:26:11,680 --> 00:26:16,520 is it's along the fence lines and that's so that it can be surveyed and so essentially 376 00:26:16,520 --> 00:26:21,280 you can't survey it if you can't walk through it so essentially that's the minimum space 377 00:26:21,280 --> 00:26:26,280 that would be needed in order to do that. 378 00:26:26,280 --> 00:26:43,040 Hi, I'm Jennifer Avesi from Environmental Services and Sustainability. 379 00:26:43,040 --> 00:26:51,240 I drafted that section with my supervisor, Joetta Daly, the reason we did pick that four 380 00:26:51,240 --> 00:26:58,460 foot buffer is for surveying and for the width for equipment. 381 00:26:58,460 --> 00:27:04,120 It's very similar to the amount of space that is required for trenching, for silt fencing. 382 00:27:04,120 --> 00:27:09,640 So it really is a maintenance consideration, that buffer space. 383 00:27:09,640 --> 00:27:16,320 Can I follow up to that? 384 00:27:16,320 --> 00:27:22,360 I have another question for you. 385 00:27:22,360 --> 00:27:26,680 So without it being the four foot, then it could be wider so essentially we're kind of 386 00:27:26,680 --> 00:27:31,880 narrowing them down to a minimum amount that they can disturb with the four foot. 387 00:27:31,880 --> 00:27:32,880 Yes. 388 00:27:32,880 --> 00:27:33,880 Okay, perfect. 389 00:27:33,880 --> 00:27:34,880 Thank you. 390 00:27:34,880 --> 00:27:35,880 That's it. 391 00:27:35,880 --> 00:27:39,640 I have one more question. 392 00:27:39,640 --> 00:27:42,200 Please go. 393 00:27:42,200 --> 00:27:46,420 So on the polypropylene pipe, that's not polyethylene, right? 394 00:27:46,420 --> 00:27:47,420 No. 395 00:27:47,420 --> 00:27:48,420 Okay. 396 00:27:48,420 --> 00:27:49,420 Polypropylene. 397 00:27:49,420 --> 00:27:50,420 So we did look at other pipes. 398 00:27:50,420 --> 00:27:56,640 One of the other common ones is HDPE, high density polyethylene pipe, does not perform 399 00:27:56,640 --> 00:27:58,540 as well as polypropylene. 400 00:27:58,540 --> 00:28:04,280 So when we did look at them, the polypropylene is a much better product we feel and other 401 00:28:04,280 --> 00:28:09,820 municipalities have also accepted that as an alternative side of the polyethylene, HDPE 402 00:28:09,820 --> 00:28:10,820 or concrete. 403 00:28:10,820 --> 00:28:11,820 Okay, thanks. 404 00:28:11,820 --> 00:28:12,820 Yep. 405 00:28:12,820 --> 00:28:13,820 Any other questions? 406 00:28:13,820 --> 00:28:14,820 A couple. 407 00:28:14,820 --> 00:28:19,820 Well, first of all, congratulations. 408 00:28:19,820 --> 00:28:20,820 Thank you. 409 00:28:20,820 --> 00:28:26,200 I think the last at least four years that we've had an update, it's been dumpster central 410 00:28:26,200 --> 00:28:29,840 and it's always been longer, wider, bigger. 411 00:28:29,840 --> 00:28:36,320 We want dumpster statues everywhere and now this is some additional flexibility. 412 00:28:36,320 --> 00:28:37,640 So I thank you for that. 413 00:28:37,640 --> 00:28:43,700 I think when we look at these documents, we have to be mindful that best laid intentions 414 00:28:43,700 --> 00:28:50,520 do cost money and we don't want to inadvertently increase the cost of living in our city even 415 00:28:50,520 --> 00:28:52,320 more than it already is. 416 00:28:52,320 --> 00:28:57,800 I also took a trip recently to a couple different cities and saw dumpsters on wheels, believe 417 00:28:57,800 --> 00:28:58,800 it or not. 418 00:28:58,800 --> 00:29:04,080 They were about half size of your typical metal dumpster and they were poly something. 419 00:29:04,080 --> 00:29:09,320 I couldn't claim to know what type of polymer or plastic they were, but it was an interesting 420 00:29:09,320 --> 00:29:16,760 adaptation they had to work around some of their unique challenges. 421 00:29:16,760 --> 00:29:23,680 I noticed in the storm water updates that there was a provision for inspections during 422 00:29:23,680 --> 00:29:30,800 the development phase to provide a stop work order in certain conditions without getting 423 00:29:30,800 --> 00:29:34,360 into specific projects. 424 00:29:34,360 --> 00:29:43,200 Does that give us the necessary tools with lessons learned recently to be able to address 425 00:29:43,200 --> 00:29:47,320 drainage problems during the development phase when they do occur? 426 00:29:47,320 --> 00:29:49,200 Yeah, I believe so. 427 00:29:49,200 --> 00:29:54,320 That's part of the intention of it is that we have a watershed inspections department 428 00:29:54,320 --> 00:29:57,920 that is responsible and they maintain that contractors and developments are following 429 00:29:57,920 --> 00:30:01,840 the proper storm water prevention processes. 430 00:30:01,840 --> 00:30:05,440 This gives us some more teeth and more written down documentation that we have the ability 431 00:30:05,440 --> 00:30:08,640 to enforce those requirements if they're not being followed. 432 00:30:08,640 --> 00:30:09,640 Thank you. 433 00:30:09,640 --> 00:30:14,440 I appreciate that. 434 00:30:14,440 --> 00:30:18,880 In a similar vein, I think we've all learned a little bit of a thing or two about what 435 00:30:18,880 --> 00:30:23,800 happens when a detention area is not maintained. 436 00:30:23,800 --> 00:30:30,800 In that section, it didn't really change that much as far as the maintenance agreements 437 00:30:30,800 --> 00:30:32,520 and that sort of thing. 438 00:30:32,520 --> 00:30:38,880 Did staff talk in this cycle about potential ways in the future to make sure that that 439 00:30:38,880 --> 00:30:39,880 maintenance happens? 440 00:30:39,880 --> 00:30:45,480 I know that we're limited by staff capacity for inspections and that sort of thing. 441 00:30:45,480 --> 00:30:47,760 What's our thinking of that going forward? 442 00:30:47,760 --> 00:30:50,600 So you're absolutely right on that thought process. 443 00:30:50,600 --> 00:30:57,080 The reason we put that, so what Commissioner or Chair Pruitt mentioned is that in the last 444 00:30:57,080 --> 00:31:02,760 revision of the criteria manual, we created and included a storm water maintenance agreement. 445 00:31:02,760 --> 00:31:06,920 So whenever a private development comes in and puts in a privately owned and operated 446 00:31:06,920 --> 00:31:12,440 flood control structure as a detention pond, previously they'd put it in and walk away 447 00:31:12,440 --> 00:31:16,400 and nobody knew who owned it, nobody knew who maintained it, nobody was maintaining 448 00:31:16,400 --> 00:31:21,080 it, and we had no ability to come in and fix it. 449 00:31:21,080 --> 00:31:26,960 So now we have a new document or new requirement in from our last revision almost two years 450 00:31:26,960 --> 00:31:32,240 ago that says any development that's going to have a private detention pond, the attention 451 00:31:32,240 --> 00:31:36,440 to an agreement says we understand that we own this, we're going to provide you an operation 452 00:31:36,440 --> 00:31:40,760 and maintenance manual that we keep on staff, that we keep on hand, that they're required 453 00:31:40,760 --> 00:31:44,760 to maintain and operate it appropriately, and if they don't, the city can come in and 454 00:31:44,760 --> 00:31:48,740 fix it and recover costs as necessary. 455 00:31:48,740 --> 00:31:53,000 So we did put that in, so a lot of the ones that we're seeing that have come up in the 456 00:31:53,000 --> 00:31:58,560 last couple months are old ones that are grandfathered in, so it's very hard for us to go back and 457 00:31:58,560 --> 00:32:03,920 require existing properties to adopt a new standard. 458 00:32:03,920 --> 00:32:07,920 So that's kind of the gray area going forward, we shouldn't be seeing any of those anymore 459 00:32:07,920 --> 00:32:11,120 since that revision went in last time. 460 00:32:11,120 --> 00:32:15,160 So we don't anticipate any future problems similar to what we've had. 461 00:32:15,160 --> 00:32:18,320 At least in developments that come new. 462 00:32:18,320 --> 00:32:19,320 Correct. 463 00:32:19,320 --> 00:32:24,480 So we've got a 40 or 50 year time period between now and when most of them are updated. 464 00:32:24,480 --> 00:32:29,000 Yeah we're trying to figure out how do we address those ones and make them equitable 465 00:32:29,000 --> 00:32:32,040 and fair to make standards. 466 00:32:32,040 --> 00:32:33,680 That's good to hear. 467 00:32:33,680 --> 00:32:41,760 And then last, I'd just like to hear some more information on the pedestrian bike removal 468 00:32:41,760 --> 00:32:45,920 of that travel demand analysis. 469 00:32:45,920 --> 00:32:54,480 My understanding before was that it was really designed to catch situations where you have 470 00:32:54,480 --> 00:33:03,320 a development that you would expect an increased amount of activity of those modes, where there 471 00:33:03,320 --> 00:33:12,480 were existing gaps in the network adjacent or nearby to the proposed development so that 472 00:33:12,480 --> 00:33:19,280 we could treat modes of travel other than driving more similar to how we treat driving. 473 00:33:19,280 --> 00:33:24,360 Totally understood that hey if that was just too confusing for people and I'm not against 474 00:33:24,360 --> 00:33:29,840 removing it, I just want to understand, you mentioned we have other ways that we can handle 475 00:33:29,840 --> 00:33:36,820 that, what's the process there and help me understand what that looks like so that our 476 00:33:36,820 --> 00:33:43,640 community is not concerned about the removal. 477 00:33:43,640 --> 00:33:45,640 Good evening committee and chair. 478 00:33:45,640 --> 00:33:47,820 Chandra, city traffic engineer. 479 00:33:47,820 --> 00:33:51,800 So we have streamlined the traffic studies right now. 480 00:33:51,800 --> 00:33:58,280 We ask for generation numbers when the development comes in and then we go for a traffic scoping 481 00:33:58,280 --> 00:34:04,600 meeting with the developers and then we catch all those and if it's a multi-family, if it's 482 00:34:04,600 --> 00:34:12,240 next to a railroad, then there will be more people using pedestrians who will commute 483 00:34:12,240 --> 00:34:18,000 back and forth so we catch them and we follow the mobility plan that identifies where the 484 00:34:18,000 --> 00:34:24,040 bike trails, side paths need so we ask for the ten foot or five feet, all those will 485 00:34:24,040 --> 00:34:26,360 be captured in the scoping meeting. 486 00:34:26,360 --> 00:34:32,880 Okay and sorry to push on this, it's just this is the type of thing that can lose institutional 487 00:34:32,880 --> 00:34:39,040 knowledge as years go forward and you know people change over, is that process within 488 00:34:39,040 --> 00:34:42,720 that scoping meeting captured within a checklist or anything? 489 00:34:42,720 --> 00:34:45,120 Yes, we have a broad range of checklists. 490 00:34:45,120 --> 00:34:50,160 Okay and that includes specifically the ped and bike expected? 491 00:34:50,160 --> 00:34:56,640 For connectivity and we take a look at where bike lanes are that needs to be continued 492 00:34:56,640 --> 00:34:59,840 with side paths that needs to be made connections. 493 00:34:59,840 --> 00:35:02,000 Okay, very good, thank you. 494 00:35:02,000 --> 00:35:09,480 And then just one last question, not transportation related. 495 00:35:09,480 --> 00:35:14,960 On the issue of detention ponds and maybe this is something to think about going forward, 496 00:35:14,960 --> 00:35:24,600 I know there's been a lot of discussion lately about what type of vegetation is best serves 497 00:35:24,600 --> 00:35:31,640 both the environmental needs of or the engineering needs of detention to reduce clogging and 498 00:35:31,640 --> 00:35:37,760 that sort of thing but also meets the environmental goals of the community. 499 00:35:37,760 --> 00:35:43,120 I didn't see anything specifically in there about you know the more native plantings and 500 00:35:43,120 --> 00:35:50,520 where things like that should be focused because my take is the i-swim document really looks 501 00:35:50,520 --> 00:35:57,360 more at what's necessary from a flow restriction perspective and doesn't necessarily look at 502 00:35:57,360 --> 00:35:59,840 the native plantings aspect of things. 503 00:35:59,840 --> 00:36:04,080 Is that something staff has considered or might consider going forward? 504 00:36:04,080 --> 00:36:08,000 So one of those things that's kind of hard to quantify and calculate because every different 505 00:36:08,000 --> 00:36:11,900 type of material has a different what's called a Manning's number in terms of how it restricts 506 00:36:11,900 --> 00:36:14,280 or modifies the flow of water. 507 00:36:14,280 --> 00:36:19,760 So usually on detention structure, flood control structures, you're looking for erosion protection, 508 00:36:19,760 --> 00:36:23,820 not necessarily for native growth or different types of vegetation unless you're doing like 509 00:36:23,820 --> 00:36:28,120 a wetland project or some sort of vernal pool or something like that. 510 00:36:28,120 --> 00:36:32,480 So you're looking more for erosion prevention, something that can germinate pretty quickly, 511 00:36:32,480 --> 00:36:36,840 provide stability to the soil slopes and the slopes are in such a way that it's able to 512 00:36:36,840 --> 00:36:38,000 be mowed and maintained. 513 00:36:38,000 --> 00:36:42,280 So I think that's a good idea, I think that's something we can definitely consider and see 514 00:36:42,280 --> 00:36:46,160 if we can make any recommendations on that but we basically try to follow the engineering 515 00:36:46,160 --> 00:36:52,920 standards of i-swim of we need to prevent these slopes from eroding over time and clogging 516 00:36:52,920 --> 00:36:53,920 the drains. 517 00:36:53,920 --> 00:36:54,920 Okay. 518 00:36:54,920 --> 00:36:55,920 Yeah, understood. 519 00:36:55,920 --> 00:37:00,920 I think we do a pretty good job of making sure that the engineering requirements are 520 00:37:00,920 --> 00:37:07,160 met because that's kind of the silo where these criteria manuals live. 521 00:37:07,160 --> 00:37:11,520 I would just say maybe especially as this gets forward to council, there may be some 522 00:37:11,520 --> 00:37:17,880 more interest at that level to get two birds with one stone, if you will. 523 00:37:17,880 --> 00:37:20,500 Yeah, we're here to receive comments and make edits. 524 00:37:20,500 --> 00:37:24,500 So all your comments, we will go back and watch this and make sure that we can make 525 00:37:24,500 --> 00:37:29,840 edits and updates as necessary and bring revised documents forward if that... 526 00:37:29,840 --> 00:37:30,840 Okay. 527 00:37:30,840 --> 00:37:38,840 Sorry, our floodplain administrator has a comment on this. 528 00:37:38,840 --> 00:37:41,680 Good evening, Mike Linder, floodplain administrator. 529 00:37:41,680 --> 00:37:48,800 I think something that speaks maybe a little bit to the concern there, in the additional 530 00:37:48,800 --> 00:37:54,200 water quality requirements that are included here, what that really does is give developers 531 00:37:54,200 --> 00:37:56,960 a lot more options to address that. 532 00:37:56,960 --> 00:38:01,860 Previously, they were forced to...if they were doing detention, really the only method 533 00:38:01,860 --> 00:38:05,360 that was open to them was extended detention where you're holding onto that water for a 534 00:38:05,360 --> 00:38:10,800 longer time to allow the sediment to settle out, draining through these very small openings, 535 00:38:10,800 --> 00:38:13,360 which lead to a lot of the clogging problems that we've seen. 536 00:38:13,360 --> 00:38:18,040 So by kind of splitting these separately to say you can address the water quality elsewhere 537 00:38:18,040 --> 00:38:21,960 on your site through something like a rain garden or a filter strip, or I think there's 538 00:38:21,960 --> 00:38:26,440 something like 32 different options listed out in the I-swim manual, and a lot of those 539 00:38:26,440 --> 00:38:32,920 do have more focus on the plantings and the vegetation because they're designed for infiltration 540 00:38:32,920 --> 00:38:37,840 and water treatment rather than just a flood control structure to protect downstream. 541 00:38:37,840 --> 00:38:43,800 So definitely we can look at incorporating more native plantings throughout the manual, 542 00:38:43,800 --> 00:38:46,920 but I think that change will speak a little bit to that concern. 543 00:38:46,920 --> 00:38:47,920 Okay. 544 00:38:47,920 --> 00:38:48,920 Yeah, I appreciate it. 545 00:38:48,920 --> 00:38:53,640 I think the reason I bring it up is just that there's a fairly sizable percentage of area 546 00:38:53,640 --> 00:38:59,680 that ends up being used for detention, and so if there's an opportunity to, without putting 547 00:38:59,680 --> 00:39:05,660 additional cost on the development, but just to guide things toward we know X is what's 548 00:39:05,660 --> 00:39:10,760 typically done, if we do Y we can achieve those goals, but actually improve some other 549 00:39:10,760 --> 00:39:12,040 things that we want to. 550 00:39:12,040 --> 00:39:17,080 I don't know the details of that, but I'd be interested to see if there are opportunities 551 00:39:17,080 --> 00:39:21,920 to get multi-use out of those land areas. 552 00:39:21,920 --> 00:39:22,920 Absolutely. 553 00:39:22,920 --> 00:39:26,800 I just wanted to comment on that. 554 00:39:26,800 --> 00:39:35,480 One of the things that we, the intent of this change also, part of what this change we're 555 00:39:35,480 --> 00:39:39,920 hoping to do is that because we were requiring, the old criteria required them to hold the 556 00:39:39,920 --> 00:39:44,160 water longer, they were oversizing the detention ponds, so the detention ponds had to be larger 557 00:39:44,160 --> 00:39:47,240 because they had to hold the water for a longer period of time. 558 00:39:47,240 --> 00:39:52,120 By separating those two out you can have the water quality treatment of bio-soils and infiltration 559 00:39:52,120 --> 00:39:56,800 gardens, rain gardens, et cetera, separately, and you can reduce the size of the detention 560 00:39:56,800 --> 00:39:57,800 pond now. 561 00:39:57,800 --> 00:40:02,160 So we're hoping to find that balance where we can reduce the detention pond size, but 562 00:40:02,160 --> 00:40:06,240 also treat the water quality at the same time, so we're aware of that. 563 00:40:06,240 --> 00:40:07,240 Okay. 564 00:40:07,240 --> 00:40:08,600 That's good. 565 00:40:08,600 --> 00:40:13,540 And I said that was the last, but I lied, there's one more. 566 00:40:13,540 --> 00:40:20,660 This is more just future direction, it's not in scope for this year's updates, but at various 567 00:40:20,660 --> 00:40:32,080 times in the past I've heard that there have been interests in providing for regional detention 568 00:40:32,080 --> 00:40:40,640 solutions in order to remove some of the barriers of infill, especially as we've done our downtown 569 00:40:40,640 --> 00:40:48,240 plan, and we have the stormwater master plan thing still going on. 570 00:40:48,240 --> 00:40:53,100 Is that a goal that we're still looking toward and we're just not quite there yet? 571 00:40:53,100 --> 00:40:57,400 That is something that we are looking, that we're working on, and it's not in the criteria 572 00:40:57,400 --> 00:41:00,240 manual per se. 573 00:41:00,240 --> 00:41:05,280 Generally regional detention is a capital project because it's affecting multiple properties. 574 00:41:05,280 --> 00:41:10,400 We do have several in the city and we are currently working on another one right now. 575 00:41:10,400 --> 00:41:15,520 So we do have regional detention, they follow the same general guide design requirements 576 00:41:15,520 --> 00:41:20,440 of detention ponds are just much larger and bringing flows in from other areas. 577 00:41:20,440 --> 00:41:25,840 So we do prefer regional detention, but those are generally a capital project and the city 578 00:41:25,840 --> 00:41:31,240 would be the ones building that and then getting cost recovery from developers as they contribute 579 00:41:31,240 --> 00:41:33,360 to it with their flows. 580 00:41:33,360 --> 00:41:34,360 Okay. 581 00:41:34,360 --> 00:41:35,520 Thank you very much. 582 00:41:35,520 --> 00:41:36,520 Any other questions? 583 00:41:36,520 --> 00:41:37,520 Oh, I'm sorry. 584 00:41:37,520 --> 00:41:42,480 If you could come up to the mic, sorry, just for the video. 585 00:41:42,480 --> 00:41:48,280 Hello, I'm Maria Ferraro with Watershed Protection. 586 00:41:48,280 --> 00:41:53,040 We just wanted to add that in the environmentally sensitive areas design criteria section eight 587 00:41:53,040 --> 00:41:58,120 that we're adding, we do have in the appendices, we added a vegetation list and that includes 588 00:41:58,120 --> 00:42:02,480 the different types of vegetation, including wetland that may add some clarification and 589 00:42:02,480 --> 00:42:05,040 help with that native seeding mix. 590 00:42:05,040 --> 00:42:06,040 Very good. 591 00:42:06,040 --> 00:42:07,040 Thank you. 592 00:42:07,040 --> 00:42:09,720 Any other questions from the commission? 593 00:42:09,720 --> 00:42:10,720 Commissioner McDuff? 594 00:42:10,720 --> 00:42:11,720 Yes. 595 00:42:11,720 --> 00:42:12,720 Any other questions? 596 00:42:12,720 --> 00:42:13,720 Question, please. 597 00:42:13,720 --> 00:42:21,120 Am I correct in knowing that this is an assimilation of the manuals that have been in several departments, 598 00:42:21,120 --> 00:42:22,720 spread over several departments? 599 00:42:22,720 --> 00:42:26,760 Yes, that was originally the case a couple of years ago. 600 00:42:26,760 --> 00:42:31,720 Last year, our last revision we did, we combined all those documents into one to mirror what 601 00:42:31,720 --> 00:42:37,320 we have in the tenant development code and provide a more cohesive unified document and 602 00:42:37,320 --> 00:42:38,960 so that's what we've been going forward with. 603 00:42:38,960 --> 00:42:39,960 Yeah, that's great. 604 00:42:39,960 --> 00:42:40,960 Thank you. 605 00:42:40,960 --> 00:42:41,960 Thank you. 606 00:42:41,960 --> 00:42:42,960 Commissioner Vicks? 607 00:42:42,960 --> 00:42:50,560 Yeah, I just have a couple comments and then one question, so I think it would definitely 608 00:42:50,560 --> 00:42:55,320 be good if you listed the water quality kind of trade-offs that you're doing in the future 609 00:42:55,320 --> 00:42:57,440 presentations because I know that you'll get asked that. 610 00:42:57,440 --> 00:42:58,440 Okay. 611 00:42:58,440 --> 00:43:04,160 But also, I had a question on the TIAs, it used to be 100 trips, now it's 50 trips. 612 00:43:04,160 --> 00:43:07,840 What was the driving force for that? 613 00:43:07,840 --> 00:43:17,000 I'm trying to decide between who's going to answer that question. 614 00:43:17,000 --> 00:43:22,080 Good evening, Chair and Commissioner. 615 00:43:22,080 --> 00:43:25,560 This is Rakibul Alam, the transportation planner. 616 00:43:25,560 --> 00:43:33,440 So our checklist has this 50 trips threshold, but our TIA was kind of outdated, so you want 617 00:43:33,440 --> 00:43:41,440 to just be consistent with the TIA. 618 00:43:41,440 --> 00:43:43,360 Thank you. 619 00:43:43,360 --> 00:43:44,360 Consistency is good. 620 00:43:44,360 --> 00:43:45,360 Thank you. 621 00:43:45,360 --> 00:43:47,160 I don't see any other questions. 622 00:43:47,160 --> 00:43:50,160 Thank you very much. 623 00:43:50,160 --> 00:43:51,160 Thank you. 624 00:43:51,160 --> 00:44:05,960 That brings us to our second work session item, sorry, the PZ25204, hold the discussion, 625 00:44:05,960 --> 00:44:09,720 give staff direction regarding Craver Ranch plan development. 626 00:44:09,720 --> 00:44:13,200 Good afternoon, Chair and Commission members. 627 00:44:13,200 --> 00:44:16,440 Charlie Rosadal, interim director of development services. 628 00:44:16,440 --> 00:44:21,520 This item for you today is to introduce the Craver Ranch development, to go over some 629 00:44:21,520 --> 00:44:27,840 of the deal points for a project and operating agreement, and then the developer has represented 630 00:44:27,840 --> 00:44:32,000 us here as well, and they'll be doing a presentation. 631 00:44:32,000 --> 00:44:37,480 Just so you can see down here below, some of the items will be coming before PNZ and 632 00:44:37,480 --> 00:44:39,320 City Council in the future. 633 00:44:39,320 --> 00:44:44,040 The project and operating agreements will go before City Council on December 2nd. 634 00:44:44,040 --> 00:44:48,880 You'll see a plan development zoning case, comprehensive plan amendments, and a mobility 635 00:44:48,880 --> 00:44:55,000 plan amendment come before this body on the November 19th meeting. 636 00:44:55,000 --> 00:45:01,080 And just see it down here in the lower right section, just to give the PNZ a little background 637 00:45:01,080 --> 00:45:05,520 on how the agreements work, we have with the developer. 638 00:45:05,520 --> 00:45:10,600 So we would have a project agreement, what's typically considered a development agreement, 639 00:45:10,600 --> 00:45:16,440 with the developer, and then they also are intending, they have created and intend to 640 00:45:16,440 --> 00:45:23,600 use a municipal management district for the operation of the ranch itself and the project. 641 00:45:23,600 --> 00:45:31,360 And then the developer would construct projects and then be reimbursed through the district. 642 00:45:31,360 --> 00:45:34,640 So this is an overview of the project site. 643 00:45:34,640 --> 00:45:40,080 You can see it's in northern Denton, just south of the Lake Ray Roberts Dam. 644 00:45:40,080 --> 00:45:48,720 It's bordered by FM 2164 on the west, well, it's 2153, and you can see 455 here as well. 645 00:45:48,720 --> 00:45:54,320 And then on the southern border, it's Gribble Springs and Sheppard Road. 646 00:45:54,320 --> 00:45:59,560 A little background on the property itself. 647 00:45:59,560 --> 00:46:04,440 So Craver Ranch was annexed into the city in 2008 and 2009. 648 00:46:04,440 --> 00:46:07,480 In total, it's 2,870 acres. 649 00:46:07,480 --> 00:46:11,360 This project in particular is 2,500 acres. 650 00:46:11,360 --> 00:46:14,080 The developer is Old Prosper Partners. 651 00:46:14,080 --> 00:46:19,160 We began this process with them in November of 2024. 652 00:46:19,160 --> 00:46:25,640 And then the city council took action in March of 2025 to approve consent for a resolution 653 00:46:25,640 --> 00:46:31,440 for creation of the municipal management district at the legislature. 654 00:46:31,440 --> 00:46:36,280 That consent was contingent on them doing a development agreement with the city so that 655 00:46:36,280 --> 00:46:41,080 we can ensure that we walk through the various things that would be needed for the development. 656 00:46:41,080 --> 00:46:47,680 So we've been meeting with them since March to go over these different negotiating terms. 657 00:46:47,680 --> 00:46:52,840 And we've conducted studies related to these as well as a fiscal impact study, facilities 658 00:46:52,840 --> 00:46:56,520 study, a travel demand model in water and wastewater. 659 00:46:56,520 --> 00:47:02,400 And a few of these studies are still being finalized. 660 00:47:02,400 --> 00:47:05,480 So a little background on what a municipal management district is. 661 00:47:05,480 --> 00:47:11,700 It's a separate political subdivision that's created to use property taxes or collect assessments 662 00:47:11,700 --> 00:47:17,760 from property owners within a district to fund infrastructure. 663 00:47:17,760 --> 00:47:23,040 So this one in particular will levy assessments for properties within the district. 664 00:47:23,040 --> 00:47:26,280 And it was created by the Texas legislature. 665 00:47:26,280 --> 00:47:30,180 So using the district, the developer would front the cost for the public infrastructure 666 00:47:30,180 --> 00:47:33,240 and then be reimbursed through the district. 667 00:47:33,240 --> 00:47:36,960 And then those revenues that they receive from the assessments would go back to pay 668 00:47:36,960 --> 00:47:41,880 the bonds that are used within that district. 669 00:47:41,880 --> 00:47:47,520 Again, this is a 2,500 acre development. 670 00:47:47,520 --> 00:47:52,160 In total, they're proposing just under 9,200 residential units. 671 00:47:52,160 --> 00:47:58,480 You can see the breakout here between single townhome, zero lot line and multifamily units. 672 00:47:58,480 --> 00:48:03,880 In addition to that, they're proposing 1.2 million square feet of commercial space. 673 00:48:03,880 --> 00:48:09,800 And then this property also is segmented into two independent school districts on the western 674 00:48:09,800 --> 00:48:13,400 portion of the property as it's Sager independent school district. 675 00:48:13,400 --> 00:48:17,680 And then on the eastern portion of the property, it's then independent school district. 676 00:48:17,680 --> 00:48:22,240 But the entirety of the property is within the city limits of Denton. 677 00:48:22,240 --> 00:48:27,800 In total, they're proposing $462 million in public infrastructure and have a 17 year construction 678 00:48:27,800 --> 00:48:32,360 timeline. 679 00:48:32,360 --> 00:48:37,840 Infrastructure that's being proposed for this development for water, they would use existing 680 00:48:37,840 --> 00:48:38,840 infrastructure. 681 00:48:38,840 --> 00:48:44,080 The city has a transmission line that runs from the Lake Roberts treatment plant down 682 00:48:44,080 --> 00:48:45,680 to loop 288. 683 00:48:45,680 --> 00:48:49,320 So they would connect to that water line for their initial phases. 684 00:48:49,320 --> 00:48:55,040 And then in the future in the city's capital plan, we have another transmission line that's 685 00:48:55,040 --> 00:48:57,040 proposed to go across the property. 686 00:48:57,040 --> 00:49:01,040 We've been working with them to provide easements for that line. 687 00:49:01,040 --> 00:49:05,080 And then they would connect to that line for future phases of the development. 688 00:49:05,080 --> 00:49:09,960 Because of the number of units for this too, it requires an elevated storage tank, which 689 00:49:09,960 --> 00:49:13,120 the developer would construct at their cost. 690 00:49:13,120 --> 00:49:16,920 And then the city would maintain that infrastructure after it's created. 691 00:49:16,920 --> 00:49:22,880 On the wastewater side, the developer would install a sewer line down to a planned Clear 692 00:49:22,880 --> 00:49:29,240 Creek interceptor that the city has, and the city would maintain the wastewater infrastructure 693 00:49:29,240 --> 00:49:31,280 following the installation. 694 00:49:31,280 --> 00:49:36,880 On the roadway side, the developer would construct the roadways within the project and the city 695 00:49:36,880 --> 00:49:43,520 would maintain those roadways after construction, except for the fact that the district would 696 00:49:43,520 --> 00:49:46,960 maintain the landscaping within those roadways. 697 00:49:46,960 --> 00:49:53,280 The roadways surrounding the property are owned by TxDOT or Denton County. 698 00:49:53,280 --> 00:49:57,840 But the developer would have to do traffic impacts analysis to determine the capacity 699 00:49:57,840 --> 00:50:05,560 of those roadways and the initial travel demand model appears to have the capacity to support 700 00:50:05,560 --> 00:50:11,400 the development, but they would do TIAs with each phase of development and make a determination 701 00:50:11,400 --> 00:50:15,680 on if any additional improvements are required. 702 00:50:15,680 --> 00:50:21,360 For drainage, the developer is required to install drainage infrastructure. 703 00:50:21,360 --> 00:50:25,080 So they would have drainage infrastructure within the roadways, and then they would also 704 00:50:25,080 --> 00:50:28,880 have detention and drainage that they would need on site. 705 00:50:28,880 --> 00:50:34,480 The city would maintain the drainage infrastructure within the right-of-way. 706 00:50:34,480 --> 00:50:39,520 You can see here a little more in detail about what the water and wastewater projects are. 707 00:50:39,520 --> 00:50:45,280 So here in this top picture, you can see the 60-inch water line that's being proposed from 708 00:50:45,280 --> 00:50:50,600 the water treatment plants that would cross the property, and then that elevated storage 709 00:50:50,600 --> 00:50:54,360 tank is proposed on the west portion of the property. 710 00:50:54,360 --> 00:50:59,800 On the wastewater side, the city is already have plans and design for this Clear Creek 711 00:50:59,800 --> 00:51:00,800 Interceptor. 712 00:51:00,800 --> 00:51:03,280 I'm sorry, this is the lower picture. 713 00:51:03,280 --> 00:51:08,640 The city is in design on this Clear Creek Interceptor and has a proposed treatment plant 714 00:51:08,640 --> 00:51:14,840 at Clear Creek, and so the developer would construct wastewater facilities from the project 715 00:51:14,840 --> 00:51:24,180 site up here into the north down to that Clear Creek Interceptor. 716 00:51:24,180 --> 00:51:30,720 On the park side, so the development is required under the Parksland Dedication Ordinance to 717 00:51:30,720 --> 00:51:38,600 dedicate 67 acres of parkland, but in total, they're proposing to have 380 acres of park 718 00:51:38,600 --> 00:51:41,320 space within the development. 719 00:51:41,320 --> 00:51:48,440 A large portion of that is within the central park, so it's a 358-acre central park. 720 00:51:48,440 --> 00:51:53,800 And then there's an additional city park on the western portion of the property, and then 721 00:51:53,800 --> 00:51:58,000 you can see here in yellow the three neighborhood parks that are being proposed. 722 00:51:58,000 --> 00:52:04,600 Also, they're proposing to include 13.5 miles of trail systems and 18.5 miles of shared 723 00:52:04,600 --> 00:52:09,040 use paths along the roadways. 724 00:52:09,040 --> 00:52:15,240 Not shown on this is additional amenities, including pocket parks and private HOA amenities 725 00:52:15,240 --> 00:52:17,360 that would be included as well. 726 00:52:17,360 --> 00:52:23,440 I will mention that in total, they'll meet the city's 10-minute walk goal by having different 727 00:52:23,440 --> 00:52:27,980 park systems throughout the entire site. 728 00:52:27,980 --> 00:52:32,400 On the park side, the developer is required to construct and maintain all of the park 729 00:52:32,400 --> 00:52:33,400 systems. 730 00:52:33,400 --> 00:52:37,720 So the mowing the grass in the parks, the maintaining the landscaping within the parks, 731 00:52:37,720 --> 00:52:43,400 that would be all funded through the development and not a cost to the city. 732 00:52:43,400 --> 00:52:50,120 On the central park itself, in total, it's 358 acres, 338 of that is within a flowage 733 00:52:50,120 --> 00:52:51,120 easement. 734 00:52:51,120 --> 00:52:55,800 The flowage easement is for the release of the dam at Lake Ray Roberts. 735 00:52:55,800 --> 00:53:01,440 The U.S. Army Corps of Engineers has an easement through the property that restricts what can 736 00:53:01,440 --> 00:53:04,160 be built within that. 737 00:53:04,160 --> 00:53:10,240 And so the main point of that flowage easement is there's no habitable structures. 738 00:53:10,240 --> 00:53:15,360 But there can be park amenities within there with approval by the Corps. 739 00:53:15,360 --> 00:53:20,680 It's important to note that that's -- so a lot of this flowage easement is outside of 740 00:53:20,680 --> 00:53:22,140 the 100-year floodplain. 741 00:53:22,140 --> 00:53:27,480 So 181 acres of that is outside of what we typically consider floodplain. 742 00:53:27,480 --> 00:53:33,840 So they have the ability also to work with the Corps of Engineers to reduce that. 743 00:53:33,840 --> 00:53:41,600 But there will be a minimum of 250 acres within that central park. 744 00:53:41,600 --> 00:53:46,180 This commission will see more detail on the zoning request as it comes forward in November. 745 00:53:46,180 --> 00:53:53,040 But at a high level, they're proposing a moderate density residential with mixed use at key intersections 746 00:53:53,040 --> 00:53:58,080 throughout the development that you can see here in the different shading on the map. 747 00:53:58,080 --> 00:54:02,160 They're also proposing to generally follow the development code with some additional deviations 748 00:54:02,160 --> 00:54:06,440 and enhancements that include standards for zero lot line homes. 749 00:54:06,440 --> 00:54:11,720 They have an established mix of residential uses with maximum numbers and dimensions for 750 00:54:11,720 --> 00:54:16,520 lot sizes that the developer will have in their presentation. 751 00:54:16,520 --> 00:54:21,680 They also have established increases for landscaping, fencing, and building standards. 752 00:54:21,680 --> 00:54:27,240 And they're providing for unique roadway cross-sections. 753 00:54:27,240 --> 00:54:31,600 In addition to the zoning change, this commission will consider a comprehensive plan amendment 754 00:54:31,600 --> 00:54:33,600 and mobility plan amendments. 755 00:54:33,600 --> 00:54:38,440 So the comprehensive plan amendment is to change it from the agricultural use that it 756 00:54:38,440 --> 00:54:43,760 received when it was annexed into the city to match the zoning that's being proposed. 757 00:54:43,760 --> 00:54:51,640 And then the mobility plan amendment is to correct for a deviation on this portion of 758 00:54:51,640 --> 00:54:54,460 the design that you can see here. 759 00:54:54,460 --> 00:55:00,840 The original mobility plan amendment had this east-west roadway going through this large 760 00:55:00,840 --> 00:55:05,960 floodplain area that would have required a large bridge expanse to cross it. 761 00:55:05,960 --> 00:55:11,400 So the developer is proposing to move this roadway further south and then cross at a 762 00:55:11,400 --> 00:55:14,420 different point of this floodplain. 763 00:55:14,420 --> 00:55:18,320 In addition to that, the travel demand model that was done supports the ability to make 764 00:55:18,320 --> 00:55:22,200 that change. 765 00:55:22,200 --> 00:55:25,040 So overall, what are the benefits to the city? 766 00:55:25,040 --> 00:55:30,480 In the agreements that we've negotiated, they would have funding contributions of $7.5 million 767 00:55:30,480 --> 00:55:37,600 to the city that you can see here, $2.5 million for emergency services, $2 million for a public 768 00:55:37,600 --> 00:55:42,840 works facility to be located near this area in the future, and then $3 million towards 769 00:55:42,840 --> 00:55:45,840 the city's affordable housing program. 770 00:55:45,840 --> 00:55:52,340 In total, land conveyance of 48.5 acres, so that would be six acres for fire stations, 771 00:55:52,340 --> 00:55:57,240 and then 42.5 acres for parks outside of the flow of easement. 772 00:55:57,240 --> 00:56:01,920 It's important to note here that the additional parks and trail systems would have a public 773 00:56:01,920 --> 00:56:07,820 access easement, so while they would not be deeded over to the city, they would be publicly 774 00:56:07,820 --> 00:56:12,920 accessible for anybody in the area to use. 775 00:56:12,920 --> 00:56:19,960 And then also, I'll point out that they're doing 315 acres more than what's required 776 00:56:19,960 --> 00:56:22,000 by the Parkland Dedication Ordinance. 777 00:56:22,000 --> 00:56:27,480 Again, I mentioned that 13.5 miles of trails, they are providing for a right of way for 778 00:56:27,480 --> 00:56:31,400 our water line, and then constructing the elevated storage tank. 779 00:56:31,400 --> 00:56:35,800 Also, they're generally following the city's typical development process with those few 780 00:56:35,800 --> 00:56:39,260 deviations that I mentioned on the zoning slide. 781 00:56:39,260 --> 00:56:44,520 And then the economic benefits is they're providing 9,200 homes for the city, 1.2 million 782 00:56:44,520 --> 00:56:50,960 square feet of commercial space, over $5 billion in assessed value at build out, and an approximate 783 00:56:50,960 --> 00:56:58,240 $38 million in net revenue to the city over 40 years. 784 00:56:58,240 --> 00:57:03,080 So next steps, the developer representative will come up and present, and then we'll have 785 00:57:03,080 --> 00:57:04,720 an opportunity for questions. 786 00:57:04,720 --> 00:57:10,440 But we're seeking this commission's feedback on this as the item moves forward. 787 00:57:10,440 --> 00:57:14,760 This will come back before the board on November 19th for the Zoning Comprehensive and Mobility 788 00:57:14,760 --> 00:57:16,840 Plan public hearings. 789 00:57:16,840 --> 00:57:21,680 And then on December 2nd, city council will consider the agreements, and then the Zoning 790 00:57:21,680 --> 00:57:24,880 Comprehensive Plan and Mobility Plan. 791 00:57:24,880 --> 00:57:31,800 And with that, I'll let Alexa Knight come and go through their slides. 792 00:57:31,800 --> 00:57:37,360 Good evening, Mr. Chairman, commissioners. 793 00:57:37,360 --> 00:57:38,480 My name is Alexa Knight. 794 00:57:38,480 --> 00:57:44,420 I'm with Dakey Law in representing Old Prosper Partners on this zoning case. 795 00:57:44,420 --> 00:57:46,280 So thank you for your time this evening. 796 00:57:46,280 --> 00:57:51,400 We know that it is valuable time, but this is a very large and complicated project which 797 00:57:51,400 --> 00:57:53,680 has a lot of moving parts. 798 00:57:53,680 --> 00:57:59,880 Charlie and I have been herding cats on both sides with regard to all the various pieces 799 00:57:59,880 --> 00:58:01,440 associated with it. 800 00:58:01,440 --> 00:58:04,560 So I'm going to give an overview, try not to repeat what Charlie has said because he's 801 00:58:04,560 --> 00:58:08,760 done a very detailed report, but we do have the entire development team here. 802 00:58:08,760 --> 00:58:14,320 So if you have specific questions on engineering, traffic, environmental, what have you, developer, 803 00:58:14,320 --> 00:58:17,640 we've got somebody here to be able to answer those questions for you. 804 00:58:17,640 --> 00:58:24,960 Okay, so this is a vicinity map and just shows the 2,500 acres which, as Charlie said, is 805 00:58:24,960 --> 00:58:27,080 in the northern part of the city of Denton. 806 00:58:27,080 --> 00:58:34,520 It is within the full purpose city limits, and it was annexed back in 2008 and 2009. 807 00:58:34,520 --> 00:58:39,020 When it is fully built out, it's a $5.1 billion value project. 808 00:58:39,020 --> 00:58:44,400 It's not small potatoes, it's something to be taken seriously for certain. 809 00:58:44,400 --> 00:58:49,440 It's going to be like nothing else that you all have seen with regard to a well-planned 810 00:58:49,440 --> 00:58:51,040 master plan community. 811 00:58:51,040 --> 00:58:55,760 And what that means, it's building that fabric for that overall community. 812 00:58:55,760 --> 00:58:57,800 It's creating a sense of place. 813 00:58:57,800 --> 00:59:02,240 It's creating that sense of place where people may come in at entry level and be able to 814 00:59:02,240 --> 00:59:03,960 move up and stay within the community. 815 00:59:03,960 --> 00:59:07,920 It's not, you know, what we don't want people to do is to move away, right? 816 00:59:07,920 --> 00:59:11,880 We want people to stay and remain in the community. 817 00:59:11,880 --> 00:59:15,480 And some of the benefits of that is having a trail system. 818 00:59:15,480 --> 00:59:21,000 We're heavy on public parks, open space, community centers, public schools, supporting retail 819 00:59:21,000 --> 00:59:23,600 and fire and police stations. 820 00:59:23,600 --> 00:59:27,800 Charlie pointed out the infrastructure, the roadway infrastructure that's around it. 821 00:59:27,800 --> 00:59:31,920 You have what we believe will be the outer loop coming to the south of it. 822 00:59:31,920 --> 00:59:39,000 And then we have 2164 on the west, I-35 even further west, and then 2153 on the east and 823 00:59:39,000 --> 00:59:41,560 coming along the north side. 824 00:59:41,560 --> 00:59:50,880 Along the southern side is Shepherd and Gribble Springs Road. 825 00:59:50,880 --> 00:59:54,320 With regard to not repeating things, I do want to repeat these because they are worth 826 00:59:54,320 --> 00:59:57,240 repeating. 827 00:59:57,240 --> 01:00:00,520 These are the benefits for supporting this master plan community. 828 01:00:00,520 --> 01:00:05,180 It is a benefit for the city and the surrounding community and the developer. 829 01:00:05,180 --> 01:00:06,680 It's a win-win for everybody. 830 01:00:06,680 --> 01:00:11,120 And why I say that for the community and for the City of Denton also is because with the 831 01:00:11,120 --> 01:00:17,520 master plan community, we are able to do all the planning, majority of the planning up 832 01:00:17,520 --> 01:00:18,520 front, right? 833 01:00:18,520 --> 01:00:22,080 The City of Denton has a lot of requirements for a developer when they come in just for 834 01:00:22,080 --> 01:00:23,080 a zoning case. 835 01:00:23,080 --> 01:00:26,280 It's not like other municipalities where you just come in and ask for a zoning case. 836 01:00:26,280 --> 01:00:29,200 There's a lot of due diligence up front. 837 01:00:29,200 --> 01:00:33,540 And so because of that, we had a couple of community meetings. 838 01:00:33,540 --> 01:00:39,280 Even though the surrounding acreage and neighbors are in the ETJ, we've invited them and we 839 01:00:39,280 --> 01:00:42,360 had a good turnout for both meetings. 840 01:00:42,360 --> 01:00:44,680 Not everybody was a repeat. 841 01:00:44,680 --> 01:00:49,480 And so we were able to explain to them what a master plan community is, what would be 842 01:00:49,480 --> 01:00:50,780 coming. 843 01:00:50,780 --> 01:00:54,400 And so with an approval of a master plan community, you know what you're going to get. 844 01:00:54,400 --> 01:00:57,360 The city knows what they're going to get for the next 20 years. 845 01:00:57,360 --> 01:01:01,120 It's not piece milled, it's not cut up in a hundred different, you know, a hundred acre 846 01:01:01,120 --> 01:01:04,980 parcels and you're, because that's difficult for a city, right? 847 01:01:04,980 --> 01:01:08,680 Trying to weave that plan together that you want to see. 848 01:01:08,680 --> 01:01:12,880 If you have the opportunity that a developer is able to spend the dollars to come in and 849 01:01:12,880 --> 01:01:17,720 do all the due diligence up front and plan that community, you know, that's better for 850 01:01:17,720 --> 01:01:19,280 the city also. 851 01:01:19,280 --> 01:01:21,580 So that's what we define as smart growth. 852 01:01:21,580 --> 01:01:24,640 The neighbors know what is being planned next door. 853 01:01:24,640 --> 01:01:30,920 It's a well thought out and designed community with an HOA within heavy on the green space 854 01:01:30,920 --> 01:01:33,040 and parkland and open space. 855 01:01:33,040 --> 01:01:40,880 It has the, we'll be bringing in the, the utility service to the area and at build out, 856 01:01:40,880 --> 01:01:47,720 we will be $5.1 billion in total assessed value, 1.2 billion in debt and tax revenue. 857 01:01:47,720 --> 01:01:54,480 And at build out annually, it'll be a $30.3 million tax revenue for the city. 858 01:01:54,480 --> 01:02:01,360 The funding contributions that the developer is doing on top of he escrowed close to $600,000 859 01:02:01,360 --> 01:02:07,480 to pay for the city consultants to help analyze all of the agreements, all of the studies 860 01:02:07,480 --> 01:02:08,680 and everything. 861 01:02:08,680 --> 01:02:16,440 On top of that, there's seven and a half million in police and fire to me equates to two and 862 01:02:16,440 --> 01:02:20,400 a half million for police and fire, two million for public works, but there'll be an offsite 863 01:02:20,400 --> 01:02:23,960 facility, three million to affordable housing. 864 01:02:23,960 --> 01:02:27,280 On top of that, there are land gifts. 865 01:02:27,280 --> 01:02:32,360 So two fire stations, total of six acres, the city parkland again, the requirement is 866 01:02:32,360 --> 01:02:40,040 only 67 acres, but the dedication would be just over 380, 13 and a half miles of trails 867 01:02:40,040 --> 01:02:43,400 easement for water transmission line, elevated storage tank. 868 01:02:43,400 --> 01:02:45,560 And this number is already outdated. 869 01:02:45,560 --> 01:02:48,920 It's actually 16 million for an offsite wastewater improvements. 870 01:02:48,920 --> 01:02:54,720 There are two trunk lines that come up to the south portion of the tract. 871 01:02:54,720 --> 01:02:55,840 All right. 872 01:02:55,840 --> 01:02:56,840 Planning and zoning. 873 01:02:56,840 --> 01:03:03,880 So this is your bread and butter, your comprehensive plan, which was approved back in 2022. 874 01:03:03,880 --> 01:03:05,120 This is a picture of that. 875 01:03:05,120 --> 01:03:07,720 This yellow star represents where the property is. 876 01:03:07,720 --> 01:03:13,480 As you can see, it's shown as ag and that's what it's been sitting on the books since 877 01:03:13,480 --> 01:03:15,720 2008 and nine. 878 01:03:15,720 --> 01:03:20,640 So in everything that's crosshatched, that's around it, that all represents ETJ. 879 01:03:20,640 --> 01:03:26,960 So we are the northern portion of it. 880 01:03:26,960 --> 01:03:32,000 Council member Beck had a question and concern last night that came up with regard to, you 881 01:03:32,000 --> 01:03:34,280 know, the leapfrog development. 882 01:03:34,280 --> 01:03:39,760 And what he was referring to was, you know, this piece right here, because the development 883 01:03:39,760 --> 01:03:41,840 today to the city comes out to here. 884 01:03:41,840 --> 01:03:46,080 So it was an interesting point, went home, did a little bit more due diligence on that, 885 01:03:46,080 --> 01:03:51,240 pulled up the city GIS system and all this flow down here. 886 01:03:51,240 --> 01:03:54,680 I mean, this is basically riddled with floodplain. 887 01:03:54,680 --> 01:04:01,400 So with regard to the leapfrog, it's the existing edge of development today leaping over a bunch 888 01:04:01,400 --> 01:04:02,720 of floodplain. 889 01:04:02,720 --> 01:04:05,720 And then we are the next logical development area. 890 01:04:05,720 --> 01:04:12,520 So the next 2500 acres up to the north. 891 01:04:12,520 --> 01:04:16,920 So this is a slide that we showed to the neighbors and we explained everything that goes along 892 01:04:16,920 --> 01:04:18,560 with zoning. 893 01:04:18,560 --> 01:04:22,340 It is, again, just the tip of the iceberg here in the city of Denton and there's quite 894 01:04:22,340 --> 01:04:25,200 a bit that goes along with it. 895 01:04:25,200 --> 01:04:29,800 We had, as Charlie mentioned, the pre-application meeting a year ago. 896 01:04:29,800 --> 01:04:32,440 We submitted a zoning application. 897 01:04:32,440 --> 01:04:38,400 And then with that, obviously, because it's shown as ag and it's RR, it will be rezoning 898 01:04:38,400 --> 01:04:41,460 to a PD, the comp plan has to be changed. 899 01:04:41,460 --> 01:04:42,640 So we have a comp plan amendment. 900 01:04:42,640 --> 01:04:45,800 We also have a thoroughfare plan amendment that I'll touch on. 901 01:04:45,800 --> 01:04:49,540 We've done our traffic assessment, the TSC was approved. 902 01:04:49,540 --> 01:04:52,160 We have the environmental assessment that was also approved. 903 01:04:52,160 --> 01:04:55,200 And then we have two agreements, the project agreement and the operating agreement that 904 01:04:55,200 --> 01:04:59,000 goes along with the deal and with the district. 905 01:04:59,000 --> 01:05:02,640 That's not the last you'll see of us with each phase we come through. 906 01:05:02,640 --> 01:05:07,120 Of course, we'll have the traffic, the drainage environment assessment and the civil engineering 907 01:05:07,120 --> 01:05:09,900 and the final plat for each phase. 908 01:05:09,900 --> 01:05:15,440 The zoning that's proposed there, we have low density with the R4 and then we have moderate 909 01:05:15,440 --> 01:05:17,320 density of R7. 910 01:05:17,320 --> 01:05:19,160 Then we have the neighborhood commercial. 911 01:05:19,160 --> 01:05:28,560 And then along the more the greater arterials, we'll have the regional commercial. 912 01:05:28,560 --> 01:05:33,020 The rooftops have to come first, then you have to have the commercial. 913 01:05:33,020 --> 01:05:37,640 One for a good master plan community would like to have the commercial embedded into 914 01:05:37,640 --> 01:05:45,240 the community so that you're not having to get in your car and drive to services. 915 01:05:45,240 --> 01:05:48,240 All right. 916 01:05:48,240 --> 01:05:53,280 This is our development plan, which again shows the different zoning categories here, 917 01:05:53,280 --> 01:05:54,280 the R4 and R7. 918 01:05:54,280 --> 01:06:00,640 It is a residential community and we have 26 phases in here. 919 01:06:00,640 --> 01:06:05,560 We take for granted because we do this on a daily basis, but 2,500 acres is quite a 920 01:06:05,560 --> 01:06:11,920 bit and that's again one of the things that we told the neighbors is you're looking at 921 01:06:11,920 --> 01:06:15,120 a 20 year life as far as build out in here. 922 01:06:15,120 --> 01:06:18,800 It's not like this is going to plunk down tomorrow and you're going to have 7,000 single 923 01:06:18,800 --> 01:06:20,720 family rooftops out there. 924 01:06:20,720 --> 01:06:29,720 The underwriting is about 400 homes per year and that of course depends on market demand. 925 01:06:29,720 --> 01:06:34,840 One of the important things to note of a quality master plan community like this is it's providing 926 01:06:34,840 --> 01:06:40,600 the fabric of land use within the community and it's creating that community. 927 01:06:40,600 --> 01:06:46,520 It is adding to the City of Denton and everything that the City of Denton residents want in their 928 01:06:46,520 --> 01:06:47,520 communities. 929 01:06:47,520 --> 01:06:54,480 So that has to do with the trail system and the open parks and the open space and importantly 930 01:06:54,480 --> 01:06:57,160 we want to provide a variety of residential products. 931 01:06:57,160 --> 01:07:00,120 So that includes town homes and it includes the multi-family. 932 01:07:00,120 --> 01:07:02,760 We have about 1,500 multi-family units. 933 01:07:02,760 --> 01:07:05,600 We've set that cap on it. 934 01:07:05,600 --> 01:07:07,560 That's about four multi-family deals. 935 01:07:07,560 --> 01:07:10,000 Certainly wouldn't start off the bat. 936 01:07:10,000 --> 01:07:12,400 It would start with single family homes. 937 01:07:12,400 --> 01:07:19,300 We have the three school districts, two school districts, three schools. 938 01:07:19,300 --> 01:07:26,560 We have the elementary shown down here for DISD, the middle school up here and then this 939 01:07:26,560 --> 01:07:30,000 is the Sanger Elementary School over here. 940 01:07:30,000 --> 01:07:32,160 The Central Park runs through here. 941 01:07:32,160 --> 01:07:36,920 There's also a beautiful open space, that green space so it runs along the western side 942 01:07:36,920 --> 01:07:40,960 of the property as well. 943 01:07:40,960 --> 01:07:44,160 These are some of the architectural product types that you might see. 944 01:07:44,160 --> 01:07:49,760 These represent 50, 60, and 70 foot wide lots. 945 01:07:49,760 --> 01:07:53,840 These could represent the 40 foot wide lots. 946 01:07:53,840 --> 01:07:59,540 This is a cottage product with a central esplanade. 947 01:07:59,540 --> 01:08:06,240 As the project becomes more developed, this could be options for the different town homes 948 01:08:06,240 --> 01:08:10,560 and live work components. 949 01:08:10,560 --> 01:08:14,320 The commercial, this is a scale. 950 01:08:14,320 --> 01:08:19,600 Again, as the project develops, this is some of the multi-family product that could be 951 01:08:19,600 --> 01:08:22,300 envisioned for the project. 952 01:08:22,300 --> 01:08:30,560 Those will be embedded in the MN zoning locations. 953 01:08:30,560 --> 01:08:36,040 This is really the crown jewel for the project and that has to do with the parks. 954 01:08:36,040 --> 01:08:45,640 We have over 483 acres of green space so that includes, the green space includes the open 955 01:08:45,640 --> 01:08:50,560 space, the park land and it excludes any of the additional trails and the neighborhood 956 01:08:50,560 --> 01:08:53,040 pocket parks that Charlie discussed. 957 01:08:53,040 --> 01:08:57,840 We are meeting the requirement of the half mile radius of every home. 958 01:08:57,840 --> 01:09:03,000 I think that's an excellent requirement within a community, especially one of this size. 959 01:09:03,000 --> 01:09:06,840 We don't want people to spend a lot of time in their cars, like when they come home, let's 960 01:09:06,840 --> 01:09:13,320 get out, let's get on to the shared bike paths, whether you're running or walking or riding 961 01:09:13,320 --> 01:09:17,560 your bike, you can navigate your way through this community. 962 01:09:17,560 --> 01:09:22,480 The dash line represents the 13 and a half miles of trail space. 963 01:09:22,480 --> 01:09:28,640 I also shared with the community when we had the meetings, I used to run quite a bit and 964 01:09:28,640 --> 01:09:31,240 run marathons and then got into trail running. 965 01:09:31,240 --> 01:09:37,920 I live in the city of Dallas and I'd have to commute an hour to be able to find a trail 966 01:09:37,920 --> 01:09:38,920 system. 967 01:09:38,920 --> 01:09:41,960 To be able to have this sort of amenity in your backyard where you can get out on the 968 01:09:41,960 --> 01:09:48,680 sidewalk and then go find a trail, that's a huge amenity. 969 01:09:48,680 --> 01:09:53,400 We have identified on here the school sites in blue. 970 01:09:53,400 --> 01:09:57,280 These represent the private amenity centers. 971 01:09:57,280 --> 01:10:02,000 This is the over 102 acres of green space on the western side. 972 01:10:02,000 --> 01:10:06,800 The eastern side, this is the 338 acre central park. 973 01:10:06,800 --> 01:10:14,040 These green areas represent the public parks also, as do these smaller yellow, which is 974 01:10:14,040 --> 01:10:19,420 about 12 acres total. 975 01:10:19,420 --> 01:10:24,640 We had a couple meetings with the parks department and we really wanted to focus on the central 976 01:10:24,640 --> 01:10:29,400 park area, and one of the things that, this was actually a slide that we used with the 977 01:10:29,400 --> 01:10:34,720 neighbors because it's hard to envision what 338 acres is for the lay person, right? 978 01:10:34,720 --> 01:10:37,920 That's the size of 256 football fields. 979 01:10:37,920 --> 01:10:39,800 It's a huge area. 980 01:10:39,800 --> 01:10:45,280 This picture is taken where the yellow star is located, so right in the center here. 981 01:10:45,280 --> 01:10:50,120 I'll get to the thoroughfare plan amendment, but this is the reason why we're asking for 982 01:10:50,120 --> 01:10:55,080 the thoroughfare plan amendment, is this beautiful central park area. 983 01:10:55,080 --> 01:11:00,040 When we met with the parks department, they too were having difficulty understanding the 984 01:11:00,040 --> 01:11:04,960 concept of the size and what you could really do with this acreage. 985 01:11:04,960 --> 01:11:06,620 This is not the plan. 986 01:11:06,620 --> 01:11:12,300 This is an exercise only to figure out, okay, well, what can we fit in there? 987 01:11:12,300 --> 01:11:15,680 This is within that 20 acres of uplands area. 988 01:11:15,680 --> 01:11:18,440 One of the things that was very important for the parks department was to have a rec 989 01:11:18,440 --> 01:11:23,320 center up here, the ability to have one, and that's a 60,000 square foot building. 990 01:11:23,320 --> 01:11:27,680 That too is not very small, and that's what's represented right here, plenty of area for 991 01:11:27,680 --> 01:11:35,280 parking around it, but that way you have ball fields here, soccer fields, amphitheater over 992 01:11:35,280 --> 01:11:40,640 here, other parking, trail systems all through along here, trail heads. 993 01:11:40,640 --> 01:11:47,680 This is a plan that satisfied the parks department that in the future that we could work together 994 01:11:47,680 --> 01:11:52,600 when we plan out each phase, lot out each phase, that we can then take this to the parks 995 01:11:52,600 --> 01:11:57,600 board, they would take this to the parks board with regard to a plan specific to that park 996 01:11:57,600 --> 01:11:58,600 area. 997 01:11:58,600 --> 01:12:05,800 These are examples that we showed the community with regard to trail heads, and this represents 998 01:12:05,800 --> 01:12:12,280 the half mile radius around each home, and we certainly meet that, and with regard to 999 01:12:12,280 --> 01:12:18,560 the active and passive different amenities that could be envisioned within the overall 1000 01:12:18,560 --> 01:12:21,400 project. 1001 01:12:21,400 --> 01:12:26,720 This is the mobility plan and the thoroughfare plan that would come before you. 1002 01:12:26,720 --> 01:12:31,240 What's in the upper left hand corner there represents that is your thoroughfare plan, 1003 01:12:31,240 --> 01:12:36,400 and so it's a nicely gridded out H of arterials. 1004 01:12:36,400 --> 01:12:40,440 Well unfortunately that H goes right through that central park, right through that pond 1005 01:12:40,440 --> 01:12:42,440 at the widest point. 1006 01:12:42,440 --> 01:12:46,480 From an environmental perspective, you don't want that. 1007 01:12:46,480 --> 01:12:48,800 From a land planning perspective, you don't want that. 1008 01:12:48,800 --> 01:12:53,760 So you want something that's a little softer, more curvilinear, slows traffic down, so that's 1009 01:12:53,760 --> 01:12:59,080 why this road is the way it is, and this orange piece here is the portion that's outside the 1010 01:12:59,080 --> 01:13:06,520 1,000 foot buffer that the city code allows you to move the roadways, and so that is the 1011 01:13:06,520 --> 01:13:11,040 portion that would need a variance, and city staff is supporting that. 1012 01:13:11,040 --> 01:13:18,640 We run our TTIA in addition to a TDM associated with all the trips out here, and this does 1013 01:13:18,640 --> 01:13:23,160 not cause any problem with those. 1014 01:13:23,160 --> 01:13:26,080 These are the typical cross sections. 1015 01:13:26,080 --> 01:13:31,480 The biggest thing I want to show this group of course is the 10 foot shared use pathways 1016 01:13:31,480 --> 01:13:35,800 that we have in both of these roadway cross sections. 1017 01:13:35,800 --> 01:13:43,640 You'll also notice that on the 65 foot right of way on the collector sections, that 10 1018 01:13:43,640 --> 01:13:48,680 foot shared path actually goes outside of the right of way, so we are adding to the 1019 01:13:48,680 --> 01:13:49,680 right of way. 1020 01:13:49,680 --> 01:13:54,680 So we have 65 feet of right of way, but then we're adding a 10 foot landscape buffer outside 1021 01:13:54,680 --> 01:13:58,760 of that that would be covered under an easement, and what that allows is you don't have to 1022 01:13:58,760 --> 01:14:03,200 crowd everything, you don't have to crowd that 10 foot shared path way in your right 1023 01:14:03,200 --> 01:14:07,900 of way, but it allows us to meander around trees as we go out there and we do the planning 1024 01:14:07,900 --> 01:14:15,160 of each one of the phases, and it's wide enough for everybody to bike, run, walk, and utilize 1025 01:14:15,160 --> 01:14:19,080 those throughout the project. 1026 01:14:19,080 --> 01:14:24,040 And finally I'm going to hit this again, the benefit of this master plan community, I mean 1027 01:14:24,040 --> 01:14:27,560 it's really going to be something excellent. 1028 01:14:27,560 --> 01:14:32,680 It is smart growth, it is something good for the city because you all know exactly what 1029 01:14:32,680 --> 01:14:34,000 you're getting. 1030 01:14:34,000 --> 01:14:38,760 And again it's a 20 year build out, you don't have to look at 25 different applications 1031 01:14:38,760 --> 01:14:48,440 and try to dovetail that into something that you want to see as part of your comp plan. 1032 01:14:48,440 --> 01:14:56,040 Again at build out you've got $5.1 billion of total assessed value, and then $30.3 million 1033 01:14:56,040 --> 01:14:58,720 annually coming in to the city. 1034 01:14:58,720 --> 01:15:05,400 Gifting contributions, $7.5 million, and then for the city we're gifting these land areas 1035 01:15:05,400 --> 01:15:10,560 again 67 acres of that should be only what's required for parkland, but we're giving over 1036 01:15:10,560 --> 01:15:16,720 380 acres, 13.5 miles of trails, 6 acres for the fire and police stations, those would 1037 01:15:16,720 --> 01:15:23,400 be joint facilities, and $16 million with offsite utilities. 1038 01:15:23,400 --> 01:15:27,600 So with that we're here to answer any questions that you may all have. 1039 01:15:27,600 --> 01:15:30,000 Thank you. 1040 01:15:30,000 --> 01:15:31,000 Questions? 1041 01:15:31,000 --> 01:15:32,000 Commissioner Riggs. 1042 01:15:32,000 --> 01:15:36,440 So I just want full disclosure, the firm I work for is helping out with the traffic impact 1043 01:15:36,440 --> 01:15:40,280 analysis on this, and so I don't feel like I need to get up and leave the room since 1044 01:15:40,280 --> 01:15:46,720 we're not voting on anything tonight, but I'm just not going to have any comments. 1045 01:15:46,720 --> 01:15:49,720 Thank you. 1046 01:15:49,720 --> 01:15:52,560 Commissioner McDade? 1047 01:15:52,560 --> 01:15:59,840 This is a whole lot, but I was wondering on the 3 million that you were, you're donating 1048 01:15:59,840 --> 01:16:06,400 $3 million to the city for affordable housing, or will you have affordable housing in your 1049 01:16:06,400 --> 01:16:07,400 plans? 1050 01:16:07,400 --> 01:16:13,280 It's a donation to the city affordable housing fund so that you can use it as you see fit. 1051 01:16:13,280 --> 01:16:15,400 But you will have multifamily out there? 1052 01:16:15,400 --> 01:16:22,840 Yes, ma'am, in addition to town home product, yes. 1053 01:16:22,840 --> 01:16:23,840 Commissioner McDuff? 1054 01:16:23,840 --> 01:16:28,640 Well, I agree with Commissioner McDate, it's a lot, it's about everything I can see except 1055 01:16:28,640 --> 01:16:33,640 a Nordstrom's and a bigger Dillard's, and if it had that I'd be glad. 1056 01:16:33,640 --> 01:16:40,880 But I will say that just again commenting, Chair Pruitt, on our thread that we've been 1057 01:16:40,880 --> 01:16:52,800 talking about, and that is the tiny homes and the different types of houses and different 1058 01:16:52,800 --> 01:16:58,720 models and a thread throughout our discussion since I've been on the commission, and the 1059 01:16:58,720 --> 01:17:07,960 need for more town homes and not so many multifamily builds. 1060 01:17:07,960 --> 01:17:15,960 Many of our citizens feel like we have enough multifamily builds, and it's time to focus 1061 01:17:15,960 --> 01:17:24,520 down and get a townhouse, so I'm just sharing that, that we might, instead of 15, 15 multifamily 1062 01:17:24,520 --> 01:17:33,160 units, we might come a little closer and have some more town homes, a few more than 584. 1063 01:17:33,160 --> 01:17:34,160 Thank you for that. 1064 01:17:34,160 --> 01:17:41,240 Commissioner Meyer? 1065 01:17:41,240 --> 01:17:48,000 I would like to second Commissioner McDuff's thoughts as well, because that was one of 1066 01:17:48,000 --> 01:17:49,940 the things I noticed. 1067 01:17:49,940 --> 01:17:56,320 1,500 multifamily units is a lot, especially when we hear from the citizens that they're 1068 01:17:56,320 --> 01:18:01,400 tired of apartments, and I think currently, even though we don't have numbers, it seems 1069 01:18:01,400 --> 01:18:06,840 like there are a lot of empty apartment units now, and I know we can't predict the future 1070 01:18:06,840 --> 01:18:10,560 on what's happening and what the needs of the community are going to be, especially 1071 01:18:10,560 --> 01:18:18,280 when you're looking at a 17-year build timeframe. 1072 01:18:18,280 --> 01:18:24,440 But definitely, you hear, not only in North Texas, not only in Denton County, but even 1073 01:18:24,440 --> 01:18:31,120 throughout the United States, that our younger generation, and I bought my first house when 1074 01:18:31,120 --> 01:18:33,560 I was 20. 1075 01:18:33,560 --> 01:18:42,320 And I know that's odd, that's not the norm, but that was in 1992 when I paid like $34,000 1076 01:18:42,320 --> 01:18:43,320 for a house. 1077 01:18:43,320 --> 01:18:45,600 Now, granted, I didn't. 1078 01:18:45,600 --> 01:18:53,040 My ex-husband and I, we were one income family and only made like $25,000 a year with a kid, 1079 01:18:53,040 --> 01:18:55,720 but that's what it was back then. 1080 01:18:55,720 --> 01:19:02,320 We're trying to figure out a way to work with the home builders, 1081 01:19:02,320 --> 01:19:08,280 because I've sat in the industry that I work in, I've sat in enough meetings and 1082 01:19:08,280 --> 01:19:13,120 discussions that part of the problem with the cost of housing 1083 01:19:13,120 --> 01:19:17,360 that's gone up is because the cost of land is going up. 1084 01:19:17,360 --> 01:19:22,320 And so trying to figure out a way where cities and developers and 1085 01:19:22,320 --> 01:19:31,280 builders can work to have affordable housing where our younger generation. 1086 01:19:31,280 --> 01:19:35,360 because this is really going to be the kids in elementary school. 1087 01:19:35,360 --> 01:19:37,680 This is going to be your first time home buyers. 1088 01:19:37,680 --> 01:19:44,160 So we're really looking at these kids that don't even know they're going to build a house. 1089 01:19:44,160 --> 01:19:49,160 And making sure that when they hit their 20s and 30s, that there is something that they can build. 1090 01:19:49,160 --> 01:19:56,040 And that they're not just having to get an apartment, because that's the only thing they can afford. 1091 01:19:56,040 --> 01:20:00,560 I'm not a huge fan of the zero lot line personally, 1092 01:20:00,560 --> 01:20:04,720 just because then you look out into a sea of rooftops. 1093 01:20:04,720 --> 01:20:11,280 So again, it's finding that balance of making sure that you are, 1094 01:20:11,280 --> 01:20:18,240 a developer's making the money on their return, because there is that aspect of it. 1095 01:20:18,240 --> 01:20:21,160 But also making sure that people can afford it. 1096 01:20:21,160 --> 01:20:27,240 I noticed that, I know it has the Denton County outer loop, 1097 01:20:27,240 --> 01:20:33,280 but it's in the maps here, it's being called the proposed regional outer loop. 1098 01:20:33,280 --> 01:20:36,560 Are we for sure that's where the location is going to be? 1099 01:20:36,560 --> 01:20:41,040 And it's not going to interfere with this development. 1100 01:20:41,040 --> 01:20:45,280 And that when you're building some of these houses, you're not going to be, 1101 01:20:47,280 --> 01:20:49,680 their backyards aren't going to be looking at. 1102 01:20:49,680 --> 01:20:54,200 >> So we have our traffic engineer here and she can speak to that, but no, we are not for sure. 1103 01:20:54,200 --> 01:20:56,200 No one is for certain where the alignments are. 1104 01:20:56,200 --> 01:20:57,400 >> Where it's going to end up at? 1105 01:20:57,400 --> 01:21:02,560 >> Right, this is a slide that Wes would put together that shows the options for the loop. 1106 01:21:02,560 --> 01:21:11,880 But we feel strongly that it'll probably be on the southern route, but no one knows 100%. 1107 01:21:11,880 --> 01:21:15,680 >> So A could go right through the middle of it, is that what I'm seeing? 1108 01:21:15,680 --> 01:21:17,440 >> Correct. 1109 01:21:17,440 --> 01:21:19,880 >> I have not seen an exact alignment on that. 1110 01:21:19,880 --> 01:21:21,360 This is still a feasibility. 1111 01:21:21,360 --> 01:21:24,360 >> Yeah, sorry, if you could come to the mic, please. 1112 01:21:24,360 --> 01:21:34,560 >> So when, I guess I need to get closer to the mic. 1113 01:21:34,560 --> 01:21:37,120 All right, so this is still in the feasibility stage. 1114 01:21:37,120 --> 01:21:43,360 Once it passes the feasibility stage, that's when they select the alignment and then go into schematic. 1115 01:21:43,360 --> 01:21:48,960 I have not seen exactly where that A is because it's a broad range. 1116 01:21:48,960 --> 01:21:53,640 Like even when they're looking at it, it's not like, oh, this is our 200 foot section. 1117 01:21:53,640 --> 01:21:55,840 They're looking at a five to 1,000 foot section. 1118 01:21:55,840 --> 01:21:59,560 It's kind of a massive location. 1119 01:21:59,560 --> 01:22:11,240 >> So when you're looking at the phases, like on slide five, when you're comparing it to this map, if, depending on the route, 1120 01:22:11,240 --> 01:22:16,000 that could be like phase 15, phase 13, 14, 9. 1121 01:22:16,000 --> 01:22:24,760 Does that mean that if TechStat decides that's the route that you're going to be working as a developer, 1122 01:22:24,760 --> 01:22:29,800 working with the city and might have to reconfigure what that could potentially look like? 1123 01:22:29,800 --> 01:22:34,320 >> Potentially, but once a route's selected, they go to schematic phase. 1124 01:22:34,320 --> 01:22:42,840 During the schematic phase, the engineers work with the developments alongside the city and things get changed. 1125 01:22:42,840 --> 01:22:51,240 From experience, the state loop 288 alignment was changed several times to avoid the developments that were in there. 1126 01:22:51,240 --> 01:22:54,080 >> And my next question, I think this is my final one. 1127 01:22:54,080 --> 01:22:58,880 This might be a question for city staff as well as kind of for the developer. 1128 01:22:58,880 --> 01:23:04,640 We're looking at 15,000 homes between Hunter and Coal Ranch and 1129 01:23:04,640 --> 01:23:10,360 now another potential 9,100, almost 9,200 units here in Craver. 1130 01:23:10,360 --> 01:23:18,440 Are we projecting that the growth, I mean I know we grow by about 100 people a day in Denton County. 1131 01:23:18,440 --> 01:23:27,920 But are we looking that we're going to be able to sustain three large developments between Landmark, Coal Ranch, and now Craver? 1132 01:23:28,960 --> 01:23:37,560 >> Yeah, so this area was identified as part of the future comprehensive plan. 1133 01:23:37,560 --> 01:23:42,480 This is an area within the city, so with regard to the housing, then yes, 1134 01:23:42,480 --> 01:23:46,920 it was contemplated that this area would develop in the future. 1135 01:23:46,920 --> 01:23:53,080 And then I will also add to that there's some additional 1136 01:23:53,080 --> 01:23:57,520 pressure from development external to the city too that we have along with the muds and stuff. 1137 01:23:57,520 --> 01:24:03,640 So we are bringing an update to the comprehensive plan amendment in the next couple of years and 1138 01:24:03,640 --> 01:24:06,440 we'll be looking at all of that information again as well. 1139 01:24:06,440 --> 01:24:10,200 >> You mean external, like the developers are demanding, like we need more space, like? 1140 01:24:10,200 --> 01:24:13,440 >> No, no, like external, outside of city limits. 1141 01:24:13,440 --> 01:24:18,600 We've got areas in Denton County that are on our periphery that are developing as well. 1142 01:24:18,600 --> 01:24:19,560 >> Okay, thank you. 1143 01:24:19,560 --> 01:24:20,060 >> Mm-hm. 1144 01:24:23,760 --> 01:24:28,720 >> I'd also want to add, with regard to this community, a couple things. 1145 01:24:28,720 --> 01:24:34,600 So creating that fabric that I talked about in the sense of place is providing also the different product types. 1146 01:24:34,600 --> 01:24:40,840 So the 1,500 multifamily units, while it may sound like a lot of units, that really is only four deals. 1147 01:24:40,840 --> 01:24:47,640 And over the 2,500 acres and the different MN zones here, which is where that multifamily would go. 1148 01:24:47,640 --> 01:24:51,160 That's the reason why we chose that. 1149 01:24:51,160 --> 01:24:56,400 I mean, it could have been a lot, I mean, a lot of deals you come in and it's a heck of a lot larger. 1150 01:24:56,400 --> 01:25:01,840 And so having all those different product types was important for us to have in the community. 1151 01:25:01,840 --> 01:25:06,800 With regard to looking at, one of the things I discussed last night with council is, 1152 01:25:06,800 --> 01:25:10,920 let's look at the macro here in the United States of what's happening. 1153 01:25:10,920 --> 01:25:15,040 And if you look at the coasts of west and the east coast, while some of those states are wonderful and 1154 01:25:15,040 --> 01:25:19,160 sure to live in, they're very expensive, and the land is very expensive. 1155 01:25:19,160 --> 01:25:22,040 It's expensive to do business, it's expensive to live. 1156 01:25:22,040 --> 01:25:27,080 So we have been seeing and experiencing here in Texas that influx of people. 1157 01:25:27,080 --> 01:25:30,600 And North Denton is, I mean, it's coming. 1158 01:25:30,600 --> 01:25:36,840 So to support the other two master plan communities and this one, they're in different regions, 1159 01:25:36,840 --> 01:25:39,640 there are different reasons why that each would succeed. 1160 01:25:39,640 --> 01:25:45,280 But again, we're underwriting 400 units a year, it's not a bajillion units either. 1161 01:25:45,280 --> 01:25:49,240 So as with any sort of development, they complement one another and 1162 01:25:49,240 --> 01:25:52,600 the reasons why you may want to live in one and I might want to live in another. 1163 01:25:52,600 --> 01:26:00,240 >> Excuse me, my name is Jim Knight, my company is the engineer for the project. 1164 01:26:00,240 --> 01:26:01,760 I wanted to add a couple things to help. 1165 01:26:01,760 --> 01:26:07,680 We, and Jennifer addressed this appropriately on that proposed outer loop alignment. 1166 01:26:07,680 --> 01:26:12,600 What we do know is that the crossing at I-35 is at Milam Road. 1167 01:26:12,600 --> 01:26:17,720 The crossing at Milam Road does not allow the path to go north of where we have it 1168 01:26:17,720 --> 01:26:21,360 shown on the map, so we know for a fact where it's gonna cross. 1169 01:26:21,360 --> 01:26:24,720 Now, it's just the geometry that lays it out there. 1170 01:26:24,720 --> 01:26:28,040 The other thing I would suggest on the multifamily, and Mrs. 1171 01:26:28,040 --> 01:26:31,280 Knight is correct, is our current performer, 1172 01:26:31,280 --> 01:26:34,600 we don't show any multifamily in here being delivered for ten years. 1173 01:26:34,600 --> 01:26:39,760 I mean, she addressed it earlier in presentation, this is against a single 1174 01:26:39,760 --> 01:26:44,760 family driven, but we need the breadth of product to be able to keep it a vibrant and 1175 01:26:44,760 --> 01:26:46,680 fabric driven community. 1176 01:26:46,680 --> 01:26:49,180 Thank you. 1177 01:26:49,180 --> 01:26:59,720 >> Other questions, Commissioner Ketchersid, is that appropriate? 1178 01:26:59,720 --> 01:27:02,200 I'm sorry, this is our first meeting together, so. 1179 01:27:02,200 --> 01:27:03,360 >> No, Ketchersid is right. 1180 01:27:03,360 --> 01:27:04,600 >> Very good. 1181 01:27:04,600 --> 01:27:13,800 So, my question is, you had said that there's a lot of green space. 1182 01:27:13,800 --> 01:27:18,560 Where it's at, how is that going to stay green? 1183 01:27:18,560 --> 01:27:20,640 Like, where's the water gonna come from? 1184 01:27:20,640 --> 01:27:26,600 >> As far as where's the water gonna come from, 1185 01:27:26,600 --> 01:27:28,880 can you explain a little bit more what you mean there? 1186 01:27:28,880 --> 01:27:33,080 >> Well, there's a lot of parks, right? 1187 01:27:33,080 --> 01:27:38,320 So we're gonna have to water the grass, 1188 01:27:38,320 --> 01:27:41,080 keep those things green for it to be green space. 1189 01:27:41,080 --> 01:27:42,080 >> I understand. 1190 01:27:42,080 --> 01:27:46,320 Yeah, so the development is proposing to have wells that would 1191 01:27:46,320 --> 01:27:48,920 be used for irrigation only on the property. 1192 01:27:48,920 --> 01:27:51,480 >> Very good, thank you. 1193 01:27:51,480 --> 01:27:56,760 >> Yeah, and we do have the option in our agreements to have reclaimed water. 1194 01:27:56,760 --> 01:27:59,680 So part of the, thank you for that, Alexa. 1195 01:27:59,680 --> 01:28:04,640 So part of the strategy for water utility team is when we're constructing or 1196 01:28:04,640 --> 01:28:08,800 making improvements to our current treatment plants. 1197 01:28:08,800 --> 01:28:15,320 That we would allow for purple pipe or to be reclaimed water to be used for irrigation. 1198 01:28:15,320 --> 01:28:21,360 So the long term plan for the city is that we would, at the treatment plants, 1199 01:28:21,360 --> 01:28:27,720 run pipe back up to allow that water to be used for irrigation. 1200 01:28:29,760 --> 01:28:30,600 >> Very good, thank you. 1201 01:28:30,600 --> 01:28:42,880 >> I got a couple, you mentioned that the perimeter streets 1202 01:28:42,880 --> 01:28:47,800 that are on the border between city and county land. 1203 01:28:47,800 --> 01:28:54,480 The reason I wanna poke at this is just that we've had situations in our southern 1204 01:28:54,480 --> 01:28:59,240 border where nobody really knew who was gonna 1205 01:28:59,240 --> 01:29:03,640 maintain the street and it went for decades without being maintained at all. 1206 01:29:03,640 --> 01:29:06,160 Obviously, this would have a lot more eyes on it and 1207 01:29:06,160 --> 01:29:08,520 there's a developer agreement and that sort of thing. 1208 01:29:08,520 --> 01:29:14,920 Has that been talked about with the county yet or is that still in flux? 1209 01:29:14,920 --> 01:29:18,440 >> Yeah, so we've actually been talking with the developer about this. 1210 01:29:18,440 --> 01:29:22,840 What would happen on at least the county's portion of roadways adjacent to 1211 01:29:22,840 --> 01:29:27,120 the property is the developer would construct improvements adjacent to 1212 01:29:27,120 --> 01:29:32,040 the property to the textile roadways to the west and east of the property. 1213 01:29:32,040 --> 01:29:37,120 The traffic demand modeling shows just a few hundred trips in between those 1214 01:29:37,120 --> 01:29:42,360 sections, so the improvements would be limited to the areas adjacent to 1215 01:29:42,360 --> 01:29:46,400 the property and to the east and west to 2153 and 2164. 1216 01:29:46,400 --> 01:29:49,640 >> Okay, but they're both textile roadways, they're not county roads. 1217 01:29:49,640 --> 01:29:53,760 >> Yeah, just the southern boundary is a county road, so 1218 01:29:53,760 --> 01:29:55,840 it's Gribble Springs and Shepherd Road here. 1219 01:29:55,840 --> 01:29:57,360 >> Okay, thank you. 1220 01:29:57,360 --> 01:30:01,680 If you could go back to your infrastructure slide. 1221 01:30:01,680 --> 01:30:05,200 We had all the bullets of, yes, perfect. 1222 01:30:05,200 --> 01:30:12,580 Just so that we can all learn how this is different or the same as, I think, 1223 01:30:12,580 --> 01:30:18,000 one of the, like a county mud municipal utility district that you mentioned. 1224 01:30:18,000 --> 01:30:21,920 Could you briefly cover how this would be different 1225 01:30:21,920 --> 01:30:25,760 if in 2008 this land was not annexed? 1226 01:30:25,760 --> 01:30:31,280 And we were sitting here learning about a county mud proposal that was in the ETJ. 1227 01:30:31,280 --> 01:30:37,400 >> Yeah, I think the biggest difference would be property tax collection. 1228 01:30:37,400 --> 01:30:39,000 So that's the obvious one. 1229 01:30:39,000 --> 01:30:41,400 So the fact that this is in the city limits, 1230 01:30:41,400 --> 01:30:46,080 it would be subject to the city property tax and that's a revenue source for us. 1231 01:30:46,080 --> 01:30:50,080 This is within our certificate of convenience and necessity. 1232 01:30:50,080 --> 01:30:55,960 So that means that the city has an obligation to provide water and 1233 01:30:55,960 --> 01:30:58,400 wastewater service to the area. 1234 01:30:58,400 --> 01:31:07,040 So what we've been doing with municipal utility districts in the recent past is 1235 01:31:07,040 --> 01:31:13,040 that one of our goals as a city is to promote regionalism and 1236 01:31:13,040 --> 01:31:21,200 to prevent the use of groundwater for developments to use for their potable water. 1237 01:31:21,200 --> 01:31:28,200 And so one of our strategies is to work with communities that are going to develop on 1238 01:31:28,200 --> 01:31:34,000 the edge of our city limits to get into agreements with them so 1239 01:31:34,000 --> 01:31:37,840 that we can have them use city services where it's applicable. 1240 01:31:37,840 --> 01:31:43,880 So in the instance of this, where it's different is they're helping to construct 1241 01:31:43,880 --> 01:31:46,800 some of the infrastructure to get there. 1242 01:31:46,800 --> 01:31:51,520 But other than that, the larger difference is the fact that they're part of the city. 1243 01:31:51,520 --> 01:31:53,880 There'll be a fabric of the city of Denton in the future and 1244 01:31:53,880 --> 01:31:55,880 that we collect property tax from it. 1245 01:31:55,880 --> 01:32:03,120 >> Okay, and am I correct in imagining that maybe it's different with different 1246 01:32:03,120 --> 01:32:08,400 developer agreements, but in that case, the waterline, for instance, 1247 01:32:08,400 --> 01:32:13,240 would be the developer's responsibility to build out to the property, 1248 01:32:13,240 --> 01:32:14,120 to the subject property? 1249 01:32:14,120 --> 01:32:17,600 >> So it depends. 1250 01:32:17,600 --> 01:32:23,480 So the responsibility of the developer is if it's in the city's impact fee 1251 01:32:23,480 --> 01:32:27,800 schedule, then if they construct improvements on that schedule, 1252 01:32:27,800 --> 01:32:30,520 then it would be eligible for impact fee credits. 1253 01:32:30,520 --> 01:32:36,240 If it wasn't something that the city plans to build, then it wouldn't be. 1254 01:32:36,240 --> 01:32:41,440 >> Okay, and then when you say, obviously we wouldn't get city tax revenue, 1255 01:32:41,440 --> 01:32:46,040 the roadways and drainage, that would not be the city's liability for 1256 01:32:46,040 --> 01:32:49,160 maintenance and replacement as well, right? 1257 01:32:49,160 --> 01:32:54,800 >> Yeah, it would be cut, well, mostly in the mud districts, then the municipal 1258 01:32:54,800 --> 01:32:58,920 utility district itself would fund the maintenance of the drainage and 1259 01:32:58,920 --> 01:32:59,960 roadway infrastructure. 1260 01:32:59,960 --> 01:33:02,800 >> Thank you. 1261 01:33:02,800 --> 01:33:11,400 The, okay, a couple comments concerning the comp plan. 1262 01:33:11,400 --> 01:33:16,720 I appreciate your comments on what you view as smart growth and 1263 01:33:16,720 --> 01:33:17,880 leapfrog development. 1264 01:33:17,880 --> 01:33:24,080 All the conversations I've seen here at PNZ and 1265 01:33:24,080 --> 01:33:29,040 council in the last ten years have been about how we don't want leapfrog 1266 01:33:29,040 --> 01:33:38,560 development and therefore we try to make sure that we're allowing development 1267 01:33:38,560 --> 01:33:42,880 closer to town, has that policy changed? 1268 01:33:42,880 --> 01:33:48,000 >> No, I don't think the policy has changed. 1269 01:33:48,000 --> 01:33:52,640 I think this one is different in the instance that this was annexed as part of 1270 01:33:52,640 --> 01:33:55,680 the city and intended to be developed in the future. 1271 01:33:55,680 --> 01:34:01,480 There's the area that's within the southern portion north of the city, 1272 01:34:01,480 --> 01:34:06,400 that area in the ETJ, but the city in 2008, 2009 took action 1273 01:34:06,400 --> 01:34:10,040 specifically to annex this portion of the city with the intent that it was going to 1274 01:34:10,040 --> 01:34:11,520 develop in the future. 1275 01:34:11,520 --> 01:34:17,440 >> Okay, and sorry. 1276 01:34:17,440 --> 01:34:20,520 >> And I'll just, if I can, I'll just add a little bit more. 1277 01:34:20,520 --> 01:34:25,760 Even in the infrastructure portion, with the improvements to the Lake Ray Roberts 1278 01:34:25,760 --> 01:34:29,320 treatment plant, the transmission line that's running in the northern part of 1279 01:34:29,320 --> 01:34:33,880 the city through this property, and the Clear Creek interceptor that's being 1280 01:34:33,880 --> 01:34:39,960 developed, it's with the intention that we are seeing development pressure 1281 01:34:39,960 --> 01:34:46,400 to the north of Lute 288, and then especially along the I-35 corridor. 1282 01:34:46,400 --> 01:34:50,040 So we're seeing that that's a trend in development going that way, and 1283 01:34:50,040 --> 01:34:54,640 this is, so the city's preparing for that to become a reality in the future. 1284 01:34:54,640 --> 01:34:55,240 >> Okay. 1285 01:34:55,240 --> 01:34:59,240 >> [INAUDIBLE] 1286 01:34:59,240 --> 01:35:09,320 >> Okay, with regard to the leapfrog development. 1287 01:35:09,320 --> 01:35:13,760 And I apologize for, when we come see you, we will have a proper map that really 1288 01:35:13,760 --> 01:35:17,840 shows, I mean, it really blows it up and shows this area. 1289 01:35:17,840 --> 01:35:20,100 And so what I meant by leapfrog development, yes, 1290 01:35:20,100 --> 01:35:22,240 it seems like it's a leapfrog development. 1291 01:35:22,240 --> 01:35:27,840 But when this was annexed in 2008 and 9, they basically went up the roadway here 1292 01:35:27,840 --> 01:35:30,680 and went 1,000 feet on either side of the roadway, right, and 1293 01:35:30,680 --> 01:35:32,440 just grabbed those little parcels. 1294 01:35:32,440 --> 01:35:36,360 But all of this area is in, there's a huge amount of floodplain here, so 1295 01:35:36,360 --> 01:35:39,800 it's not developable, so we are the next development. 1296 01:35:39,800 --> 01:35:45,840 So it's really not leapfrog development, it's the next acreage to be developed. 1297 01:35:45,840 --> 01:35:48,320 Which is why I think the city annexed it and 1298 01:35:48,320 --> 01:35:51,040 why they envisioned that it would be developed. 1299 01:35:51,040 --> 01:35:54,720 Now it's been sitting on the books as ag for 17 years, but now there's an opportunity 1300 01:35:54,720 --> 01:36:01,440 to take in all 2,500 acres as a revenue generating service for your city. 1301 01:36:01,440 --> 01:36:02,160 >> Okay. 1302 01:36:02,160 --> 01:36:03,160 No, I appreciate that. 1303 01:36:03,160 --> 01:36:11,160 I think I would just like some clarification, 1304 01:36:11,160 --> 01:36:16,760 not right now, but in the future from staff, our comp plan says, 1305 01:36:16,760 --> 01:36:20,240 in the land use element, it says the availability of green field land coupled 1306 01:36:20,240 --> 01:36:24,760 with the demand for large single family detached dwelling residential subdivisions 1307 01:36:24,760 --> 01:36:29,240 has facilitated development that outwardly expanded the suburban fringe 1308 01:36:29,240 --> 01:36:32,240 at a relatively low density and intensity. 1309 01:36:32,240 --> 01:36:36,880 This trend has resulted in a land use pattern that has tended to further extend 1310 01:36:36,880 --> 01:36:41,040 distances between where people live, work, and shop, resulting in a rate of land 1311 01:36:41,040 --> 01:36:47,920 consumption and sprawl which grew faster than the underlying growth of the population, 1312 01:36:47,920 --> 01:36:52,920 producing an unsustainable trend that is costly for the city and taxpayers alike. 1313 01:36:52,920 --> 01:36:57,160 Meanwhile, considerably more vacant land exists within the present city limits, 1314 01:36:57,160 --> 01:37:01,840 both unplatted tracks and already planned and approved master plan communities 1315 01:37:01,840 --> 01:37:05,240 than can be absorbed by the city's projected population growth over the next 1316 01:37:05,240 --> 01:37:06,680 two decades and beyond. 1317 01:37:06,680 --> 01:37:10,400 So like you said, maybe that's false now, I don't know. 1318 01:37:10,400 --> 01:37:13,920 But I would just like some staff response to that over the next few weeks. 1319 01:37:13,920 --> 01:37:16,480 - We'll bring it back with a comprehensive plan amendment discussion. 1320 01:37:16,480 --> 01:37:25,960 - And yeah, I did want to, just for our commission understanding, 1321 01:37:25,960 --> 01:37:31,240 a lot of these terms get confusing and I'm probably the worst about just 1322 01:37:31,240 --> 01:37:34,400 throwing out a term. 1323 01:37:34,400 --> 01:37:37,840 Certainly, everybody's free to define terms however they want. 1324 01:37:37,840 --> 01:37:44,280 But the American Planning Association, how they define smart growth as they say, 1325 01:37:44,280 --> 01:37:48,760 compact transit accessible pedestrian oriented mixed use development patterns 1326 01:37:48,760 --> 01:37:55,560 and land reuse epitomize the application of principles of smart growth. 1327 01:37:55,560 --> 01:38:00,400 In contrast to prevalent development practices, smart growth reinforces 1328 01:38:00,400 --> 01:38:05,200 a larger share of regional growth within central cities, urbanized areas, 1329 01:38:05,200 --> 01:38:11,360 inner suburbs and areas that are already served by infrastructure, I think it goes on. 1330 01:38:11,360 --> 01:38:16,880 So just for context of some other definitions. 1331 01:38:16,880 --> 01:38:23,280 Yeah, I'll say this looks like a superbly designed sort of bedroom residential 1332 01:38:23,280 --> 01:38:30,840 community that a lot of people would want to live in that I have no problem with that. 1333 01:38:30,840 --> 01:38:34,440 The concern I have is from a fiscal perspective, so I'll be interested to see 1334 01:38:34,440 --> 01:38:40,080 once that fiscal analysis is complete and really see what that looks like 1335 01:38:40,080 --> 01:38:44,960 from a bottoms up roll up of can we afford to maintain the streets 1336 01:38:44,960 --> 01:38:46,520 and replace them when they fail. 1337 01:38:46,520 --> 01:38:48,040 - Okay. - So thank you. 1338 01:38:48,040 --> 01:38:54,760 Any other questions from the commission or comments? 1339 01:38:54,760 --> 01:38:56,280 Commissioner MacDuff. 1340 01:38:56,280 --> 01:39:02,040 - I just want to make sure that our comment, my comment and Commissioner Dyer's comment 1341 01:39:02,040 --> 01:39:09,200 about the ratio of the town homes versus the multifamily is included in the staff 1342 01:39:09,200 --> 01:39:12,280 commentary that we'll see later on. 1343 01:39:12,280 --> 01:39:15,280 - Yeah, I think Haley will have that note. 1344 01:39:15,280 --> 01:39:19,960 Yeah, and I do want to make another comment too that I think those are maximums 1345 01:39:19,960 --> 01:39:21,120 in the zoning ordinance. 1346 01:39:21,120 --> 01:39:26,080 And so as this thing builds out over the next 20 years that it's not necessarily 1347 01:39:26,080 --> 01:39:29,640 set that yes, there will be this exact number of multifamily. 1348 01:39:29,640 --> 01:39:44,560 That's a maximum so there could be no multifamily in this project as it moves forward. 1349 01:39:44,560 --> 01:39:46,520 - Okay, not seeing any other questions. 1350 01:39:46,520 --> 01:39:51,640 Thank you very much. 1351 01:39:51,640 --> 01:40:01,200 That concludes our work sessions for this afternoon at 6.11 p.m. we will break for dinner 1352 01:40:01,200 --> 01:40:03,600 and we'll be back in council chambers at 6.30. 1353 01:40:03,600 --> 01:40:11,680 Thank you. 1354 01:40:11,680 --> 01:40:12,520 - Good evening. 1355 01:40:12,520 --> 01:40:20,160 At 6.33 p.m. this Wednesday, October 22nd, 2025, I will call the regular meeting of the 1356 01:40:20,160 --> 01:40:22,480 Denton Planning and Zoning Commission to order. 1357 01:40:22,480 --> 01:40:27,000 Our first order of business is to stand and say the Pledge of Allegiance to the US and 1358 01:40:27,000 --> 01:40:32,000 Texas Flag. 1359 01:40:32,000 --> 01:40:52,640 I pledge allegiance to the flag of the United States of America and to the republic for 1360 01:40:52,640 --> 01:40:53,640 which it stands, one nation under God, indivisible, with liberty and justice for all. 1361 01:40:53,640 --> 01:40:54,640 - I pledge allegiance to the flag of the United States of America and to the republic for 1362 01:40:54,640 --> 01:40:55,640 which it stands, one nation under God, indivisible, with liberty and justice for all. 1363 01:40:55,640 --> 01:40:56,640 - I pledge allegiance to the flag of the United States of America and to the republic 1364 01:40:56,640 --> 01:40:57,640 for which it stands, one nation under God, indivisible, with liberty and justice for 1365 01:40:57,640 --> 01:40:58,640 all. 1366 01:40:58,640 --> 01:40:59,640 - I pledge allegiance to the flag of the United States of America and to the republic 1367 01:40:59,640 --> 01:41:00,640 for which it stands, one nation under God, indivisible, with liberty and justice for 1368 01:41:00,640 --> 01:41:01,640 all. 1369 01:41:01,640 --> 01:41:10,240 That brings us to item 2, PZ 25-197, consider approval of the planning and zoning minutes 1370 01:41:10,240 --> 01:41:12,480 from October 8th. 1371 01:41:12,480 --> 01:41:21,920 Any questions or motion from the commission? 1372 01:41:21,920 --> 01:41:22,920 Commissioner McDade? 1373 01:41:22,920 --> 01:41:26,760 Motion to approve. 1374 01:41:26,760 --> 01:41:28,860 That's a motion to approve. 1375 01:41:28,860 --> 01:41:29,860 And Commissioner Riggs? 1376 01:41:29,860 --> 01:41:30,860 I second. 1377 01:41:30,860 --> 01:41:40,360 Seeing no questions, I'll call for a vote on the board. 1378 01:41:40,360 --> 01:41:42,960 That item passes 7-0. 1379 01:41:42,960 --> 01:41:52,560 Brings us to our consent agenda, item 3A, FR 25-001-0A, is the only item. 1380 01:41:52,560 --> 01:41:59,760 Any questions or a motion on the consent agenda? 1381 01:41:59,760 --> 01:42:01,320 Commissioner Riggs? 1382 01:42:01,320 --> 01:42:04,680 Make a motion to approve the consent agenda. 1383 01:42:04,680 --> 01:42:07,560 And Commissioner Garland? 1384 01:42:07,560 --> 01:42:10,560 And I second to move forward with the consent agenda. 1385 01:42:10,560 --> 01:42:23,120 With the motion as second, seeing no other questions, I'll call for a vote on the board. 1386 01:42:23,120 --> 01:42:25,780 That item passes 7-0. 1387 01:42:25,780 --> 01:42:41,860 Brings us to our items for individual consideration PZ 25-196. 1388 01:42:41,860 --> 01:42:46,360 So this item is just consideration of your calendar for next year. 1389 01:42:46,360 --> 01:42:50,360 We did our best to keep meetings on the second and fourth Tuesdays, which was the pattern 1390 01:42:50,360 --> 01:42:54,760 we had this year, but there are a few exceptions for holidays accommodating for the school 1391 01:42:54,760 --> 01:42:56,560 district spring break and things of that sort. 1392 01:42:56,560 --> 01:43:01,660 But if you all have any concerns with the calendar, we can consider making modifications 1393 01:43:01,660 --> 01:43:05,640 to it as needed. 1394 01:43:05,640 --> 01:43:09,440 Any questions? 1395 01:43:09,440 --> 01:43:13,040 Just to clarify, just for the record, I believe you said on Tuesdays, but I think you meant 1396 01:43:13,040 --> 01:43:14,040 Wednesdays. 1397 01:43:14,040 --> 01:43:16,760 Yes, you're correct. 1398 01:43:16,760 --> 01:43:23,720 We almost got an update to the council, the first city to have dueling councils. 1399 01:43:23,720 --> 01:43:27,200 Okay. 1400 01:43:27,200 --> 01:43:31,680 Any other questions or a motion? 1401 01:43:31,680 --> 01:43:34,480 Commissioner Dyer? 1402 01:43:34,480 --> 01:43:40,660 I make a motion that we approve the 2026 Planning and Zoning Commission as it sits before us. 1403 01:43:40,660 --> 01:43:45,280 And the calendar, right? 1404 01:43:45,280 --> 01:43:46,280 The calendar. 1405 01:43:46,280 --> 01:43:47,280 What did I, did I not say calendar? 1406 01:43:47,280 --> 01:43:48,880 Just to approve the commission. 1407 01:43:48,880 --> 01:43:49,880 Oh, sorry. 1408 01:43:49,880 --> 01:43:50,880 I think. 1409 01:43:50,880 --> 01:43:51,880 Yes. 1410 01:43:51,880 --> 01:43:52,880 Yes, calendar. 1411 01:43:52,880 --> 01:43:53,880 Okay. 1412 01:43:53,880 --> 01:43:55,000 Commissioner Garland. 1413 01:43:55,000 --> 01:43:59,680 And I second the approval of the 2026 Planning and Zoning Commission calendar. 1414 01:43:59,680 --> 01:44:01,360 Thank you. 1415 01:44:01,360 --> 01:44:14,120 With a motion and a second and no questions, I call for a vote on the board. 1416 01:44:14,120 --> 01:44:25,360 That item passes 7-0, brings us to our second item for individual consideration, FP250028. 1417 01:44:25,360 --> 01:44:26,360 Welcome Angie. 1418 01:44:26,360 --> 01:44:31,080 Good evening chair and members of the commission. 1419 01:44:31,080 --> 01:44:36,120 Angie Manglaris, assistant planning director here to present FP250028. 1420 01:44:36,120 --> 01:44:38,960 This is a final plat for the reserve at Brush Creek. 1421 01:44:38,960 --> 01:44:44,840 It is a single family residential subdivision situated the northeast corner of Brush Creek 1422 01:44:44,840 --> 01:44:45,840 and US377. 1423 01:44:45,840 --> 01:44:51,120 At this time, the final plat does not meet all of our criteria for approval, but staff 1424 01:44:51,120 --> 01:44:56,440 has no objection to the requested extension that could be granted to date certain of November 1425 01:44:56,440 --> 01:44:57,440 17th. 1426 01:44:57,440 --> 01:45:04,520 I'm happy to answer any questions you all may have. 1427 01:45:04,520 --> 01:45:08,520 Any questions from the commission? 1428 01:45:08,520 --> 01:45:21,680 Or a motion? 1429 01:45:21,680 --> 01:45:22,680 Commissioner Dyer. 1430 01:45:22,680 --> 01:45:31,840 I make a motion that we go ahead and delay the approval of this to deny it today, but 1431 01:45:31,840 --> 01:45:37,120 to go ahead and approve the extension for November 17th. 1432 01:45:37,120 --> 01:45:39,160 Commissioner Riggs. 1433 01:45:39,160 --> 01:45:41,800 I second that. 1434 01:45:41,800 --> 01:45:42,800 Very good. 1435 01:45:42,800 --> 01:45:54,680 Seeing no more questions, I'll call for a vote on the board. 1436 01:45:54,680 --> 01:46:13,080 And that item passes 7-0. 1437 01:46:13,080 --> 01:46:17,240 Brings us to our last item of individual consideration. 1438 01:46:17,240 --> 01:46:21,120 Commissioner McDade, if you want to recuse, you may. 1439 01:46:21,120 --> 01:46:28,520 At the record show, Commissioner McDade is recusing herself and Commissioner Riggs as 1440 01:46:28,520 --> 01:46:34,800 well on item 4C, FR25-0020. 1441 01:46:34,800 --> 01:46:45,600 Good evening, I'm Julie Wyatt, presenting FR2520. 1442 01:46:45,600 --> 01:46:53,640 This is a replat of a four-plex development located just west of Loop 288, south of Audra. 1443 01:46:53,640 --> 01:47:00,000 Originally, in your packet, the staff recommended denial with a proposed extension. 1444 01:47:00,000 --> 01:47:05,800 However, staff and the applicant worked together and they resolved all comments, and so staff 1445 01:47:05,800 --> 01:47:09,120 has modified the recommendation to approval. 1446 01:47:09,120 --> 01:47:12,920 I'll be happy to answer any questions. 1447 01:47:12,920 --> 01:47:23,640 Glad to see this coming through, it's been a while. 1448 01:47:23,640 --> 01:47:30,040 Yeah, I'm not sure which one of these will be three-plexes and four-plexes, but I will 1449 01:47:30,040 --> 01:47:37,680 point out that this is very near to our 2,000 square foot minimum proposed for DDC amendments 1450 01:47:37,680 --> 01:47:49,440 for the townhomes, and so the parking requirement that we have for sale townhomes does limit 1451 01:47:49,440 --> 01:47:53,920 how small of a townhome you can build for purchase. 1452 01:47:53,920 --> 01:47:54,920 Any other? 1453 01:47:54,920 --> 01:47:55,920 Commissioner McDuff. 1454 01:47:55,920 --> 01:48:03,600 Oh, yes, I'd like to agree with the staff and make a motion to approve the request by 1455 01:48:03,600 --> 01:48:07,800 ECM Eden Village LP. 1456 01:48:07,800 --> 01:48:11,440 Make that approval, please. 1457 01:48:11,440 --> 01:48:13,860 And Commissioner Ketreson. 1458 01:48:13,860 --> 01:48:16,960 I'll second that. 1459 01:48:16,960 --> 01:48:19,120 Very well. 1460 01:48:19,120 --> 01:48:37,080 Seeing no questions further, I'll call for a vote on the board. 1461 01:48:37,080 --> 01:48:45,040 That item passes 5-0 with two recusals. 1462 01:48:45,040 --> 01:48:51,520 Let the record show that Commissioner Riggs and Commissioner McDade are rejoining us for 1463 01:48:51,520 --> 01:48:56,440 our first public hearing, item 5A, HL 25-0002. 1464 01:48:56,440 --> 01:49:02,080 Thank you, Chair and Commission, Cameron Robertson, Historic Preservation Officer. 1465 01:49:02,080 --> 01:49:07,840 This is for a historic landmark designation of 3316 Roseland Drive. 1466 01:49:07,840 --> 01:49:12,760 The property is located at the northeast corner of Roseland Drive and Roseland Circle. 1467 01:49:12,760 --> 01:49:15,180 The owner is Lee Ann Todd. 1468 01:49:15,180 --> 01:49:23,120 Construction dates range from approximately 1870s to the 1960s in a multi-phase construction. 1469 01:49:23,120 --> 01:49:27,000 As I stated, this is a request for a historic landmark designation. 1470 01:49:27,000 --> 01:49:32,800 It is zoned R4, and it is a single-family residence. 1471 01:49:32,800 --> 01:49:37,760 Just to go through some photos of the property itself, this shows on the left-hand side that 1472 01:49:37,760 --> 01:49:47,640 front south facade and the rear north facades, the east and west facades of the property, 1473 01:49:47,640 --> 01:49:52,400 south and west facade view of the property, because it's pretty large, and then the circa 1474 01:49:52,400 --> 01:49:55,920 1960s pool and cabana in the rear. 1475 01:49:55,920 --> 01:50:02,640 This is a survey of the property, which it is the one that is bordered in red. 1476 01:50:02,640 --> 01:50:08,480 I did look at the Denton Development Code section 2.9.4b, specifically stating that 1477 01:50:08,480 --> 01:50:15,080 3316 Roseland Drive meets following criteria of 3, 5, 9, and 11. 1478 01:50:15,080 --> 01:50:17,640 I'm not going to read those out loud. 1479 01:50:17,640 --> 01:50:22,880 They were in your backup packet, but looking at approval criteria 3 and 9, it's really 1480 01:50:22,880 --> 01:50:26,080 concentrated more on that architectural style. 1481 01:50:26,080 --> 01:50:32,560 The home itself has a lot of Victorian influences for architecture, ranging from that late Victorian 1482 01:50:32,560 --> 01:50:36,480 vernacular to those mid-century influences. 1483 01:50:36,480 --> 01:50:40,680 You can see the example of the Italianate and the Greek Revival, which was highlighted 1484 01:50:40,680 --> 01:50:44,760 a little bit more in your backup packet, but you can see both of those influences on that 1485 01:50:44,760 --> 01:50:48,080 3316 Roseland Drive property. 1486 01:50:48,080 --> 01:50:56,880 As I stated in the criteria 9, it is that cumulative history of architecture over time. 1487 01:50:56,880 --> 01:51:00,200 In criteria 5, it was constructed in three phases. 1488 01:51:00,200 --> 01:51:06,560 We have that side gabled hall and parlor type residence, which is that pre-1880. 1489 01:51:06,560 --> 01:51:10,280 We have a vernacular addition that was added to that front south facade, which is highlighted 1490 01:51:10,280 --> 01:51:14,560 in that center photo, which is 1880 to 1910. 1491 01:51:14,560 --> 01:51:20,320 Then we have that influence of the Greek and Italianate Revival addition at that front facade, 1492 01:51:20,320 --> 01:51:25,840 with some additional architectural detailing along the roof and the eaves. 1493 01:51:25,840 --> 01:51:31,960 In addition, we have that pool and cabana construction in the rear in the 1960s. 1494 01:51:31,960 --> 01:51:33,960 We're also looking at criteria 11. 1495 01:51:33,960 --> 01:51:38,880 Dr. Harold Brenholtz, he is the eighth owner of this property, or he was the eighth owner 1496 01:51:38,880 --> 01:51:40,100 of this property. 1497 01:51:40,100 --> 01:51:44,400 He taught at North Texas State University, which is now University of North Texas. 1498 01:51:44,400 --> 01:51:49,120 He was a professor of education from 1923 to 1960. 1499 01:51:49,120 --> 01:51:54,360 He actually helped launch the school's education doctoral program. 1500 01:51:54,360 --> 01:52:00,520 He was one of the original organizers of the Denton Lions Club, which is an international 1501 01:52:00,520 --> 01:52:01,520 service club. 1502 01:52:01,520 --> 01:52:05,400 He also served the Denton community as a scoutmaster. 1503 01:52:05,400 --> 01:52:09,960 You can see the arrows pointing to him in some of the photos and just some of the different 1504 01:52:09,960 --> 01:52:14,000 articles in the staff directory. 1505 01:52:14,000 --> 01:52:18,720 Looking not only at the criteria, staff analysis also looked at the 2019 Historic Preservation 1506 01:52:18,720 --> 01:52:25,360 Plan, goal number one, policy 1.3, which looks at prioritizing and designing eligible buildings 1507 01:52:25,360 --> 01:52:28,640 and areas for potential landmarks and historic districts. 1508 01:52:28,640 --> 01:52:33,640 Then also our Denton 2040 Comprehensive Plan, goal CC2, which preserves and maintain the 1509 01:52:33,640 --> 01:52:36,920 unique character of Denton. 1510 01:52:36,920 --> 01:52:42,740 There was public outreach done, both newspaper, website, property sign posted. 1511 01:52:42,740 --> 01:52:50,000 We did receive one response in favor, as you all got that email earlier today. 1512 01:52:50,000 --> 01:52:56,840 Staff is recommending approval for the property at 3316 Rose Lawn Drive, as the designation 1513 01:52:56,840 --> 01:53:00,680 is consistent with the goals and objectives of our Denton 2040 Comprehensive Plan, as 1514 01:53:00,680 --> 01:53:05,520 well as the Denton Development Code and our 2019 Historic Preservation Plan. 1515 01:53:05,520 --> 01:53:10,080 Historic Landmark Commission did review this, and they recommended approval for zero. 1516 01:53:10,080 --> 01:53:12,720 It will go forward to City Council on December 2nd. 1517 01:53:12,720 --> 01:53:13,720 I can stand for any questions. 1518 01:53:13,720 --> 01:53:20,200 The applicant is here if you have any questions for her as well. 1519 01:53:20,200 --> 01:53:22,100 Any questions from the commission? 1520 01:53:22,100 --> 01:53:23,200 This is a public hearing. 1521 01:53:23,200 --> 01:53:30,640 I will open the public hearing at this time. 1522 01:53:30,640 --> 01:53:35,640 I don't have any cards filled out to speak yet, but it is a public hearing. 1523 01:53:35,640 --> 01:53:46,680 You're welcome to come down and share your thoughts if you want to, for anyone here. 1524 01:53:46,680 --> 01:53:55,680 Seeing no one ... It's up to you. 1525 01:53:55,680 --> 01:53:59,960 Okay. 1526 01:53:59,960 --> 01:54:05,160 I'll close the public hearing at this time. 1527 01:54:05,160 --> 01:54:08,520 Any questions before ... Okay. 1528 01:54:08,520 --> 01:54:09,520 Commissioner McDuff? 1529 01:54:09,520 --> 01:54:18,280 I'm proud to make a motion to agree with the staff and our historical landmark officer 1530 01:54:18,280 --> 01:54:23,680 for the approval of the recommendation to the City Council regarding a request by Lee 1531 01:54:23,680 --> 01:54:29,640 and Todd, the property owner, for historic landmark designation in accordance with Section 1532 01:54:29,640 --> 01:54:39,640 2.9.4 of the Denton Development Code for the property located at 3316 Roseland Drive. 1533 01:54:39,640 --> 01:54:41,320 Commissioner Garland? 1534 01:54:41,320 --> 01:54:45,760 I will second the motion to approve staff recommendation. 1535 01:54:45,760 --> 01:54:51,000 You have a beautiful home. 1536 01:54:51,000 --> 01:54:54,400 Any other discussion from the commission? 1537 01:54:54,400 --> 01:55:08,000 Yeah, I'll just say I have conflicted thoughts with many of the historic preservation applications, 1538 01:55:08,000 --> 01:55:12,800 not because I don't believe in historic preservation, but because I want to make sure we're focusing 1539 01:55:12,800 --> 01:55:24,480 our energy on places that will yield public benefit from an educational or appreciation 1540 01:55:24,480 --> 01:55:25,480 perspective. 1541 01:55:25,480 --> 01:55:31,040 I think the history of the historic designations of many of the older homes on Oak and Hickory 1542 01:55:31,040 --> 01:55:37,940 Street is a great testament to something that I would gander to say almost everybody in 1543 01:55:37,940 --> 01:55:42,000 our community knows about, right, because it's so visible. 1544 01:55:42,000 --> 01:55:47,920 But in this case, it's, you know, there's not really a, it's not in central Denton, 1545 01:55:47,920 --> 01:55:55,400 it's not, doesn't have any redevelopment potential really, and so I think that it's a fair application 1546 01:55:55,400 --> 01:56:07,320 of the tools that we have to make sure that unique architecture stays in good repair. 1547 01:56:07,320 --> 01:56:21,360 Seeing no other questions, I'll call for a vote on the board. 1548 01:56:21,360 --> 01:56:24,560 And that item passes 7-0. 1549 01:56:24,560 --> 01:56:40,760 That brings us to our second public hearing item, PDA 25-0002. 1550 01:56:40,760 --> 01:56:41,760 Good evening. 1551 01:56:41,760 --> 01:56:46,440 I'm Julie Wyatt, Principal Planner with the City of Denton, and I am presenting PDA 25-2, 1552 01:56:46,440 --> 01:56:49,000 which is a charter school. 1553 01:56:49,000 --> 01:56:55,360 So the request before you is a plan development amendment to one of our older PDs, PD 139. 1554 01:56:55,360 --> 01:57:01,480 The purpose of it is to allow a use that's been approved to move forward with development 1555 01:57:01,480 --> 01:57:02,480 of the property. 1556 01:57:02,480 --> 01:57:10,300 In 2020, the site plan was approved for a charter school through this plan development 1557 01:57:10,300 --> 01:57:11,300 amendment process. 1558 01:57:11,300 --> 01:57:13,720 However, there have been some changes. 1559 01:57:13,720 --> 01:57:18,820 They want to modify that site plan, and so they're coming back to you in order to do 1560 01:57:18,820 --> 01:57:20,800 so. 1561 01:57:20,800 --> 01:57:25,880 So they are proposing to modify the site plan that was approved, which includes removing 1562 01:57:25,880 --> 01:57:32,960 approximately 4.4 acres, reducing the building footprint and open space, removing the proposed 1563 01:57:32,960 --> 01:57:34,280 high school for now. 1564 01:57:34,280 --> 01:57:40,560 They may put that in later phases, and then reconfigure the parking and access areas. 1565 01:57:40,560 --> 01:57:49,840 The subject property is located on the south side of Vintage, just east of 35W. 1566 01:57:49,840 --> 01:57:54,600 Just a little bit of background about PD 139, it is one of our older PDs. 1567 01:57:54,600 --> 01:58:02,980 As I mentioned, it was established in 1991 as a 450-acre business village, and that permitted 1568 01:58:02,980 --> 01:58:05,800 the proposed institutional use. 1569 01:58:05,800 --> 01:58:12,000 It's been amended several times since it was originally created. 1570 01:58:12,000 --> 01:58:16,320 First of all, the Vintage neighborhood, just to the east of the subject property. 1571 01:58:16,320 --> 01:58:20,820 There was a request for gas well development, and that was approved. 1572 01:58:20,820 --> 01:58:24,080 And then the proposed charter school in 2020. 1573 01:58:24,080 --> 01:58:29,280 Since 2020, there's also been a multifamily development approved, just adjacent to the 1574 01:58:29,280 --> 01:58:32,600 west of the subject property, and a commercial use. 1575 01:58:32,600 --> 01:58:38,500 It's under development now, but it is proposed for that corner at 35 and Vintage. 1576 01:58:38,500 --> 01:58:45,240 It's also important to note that the 450 acres has shrunk, and that 213 of those acres have 1577 01:58:45,240 --> 01:58:51,920 been rezoned out of the PD and into just based zoning districts. 1578 01:58:51,920 --> 01:58:55,800 So the request before you, sorry, there's a lot on this slide, but just wanted to allow 1579 01:58:55,800 --> 01:58:59,960 you to kind of compare what was approved and what they're proposing. 1580 01:58:59,960 --> 01:59:04,800 We won't go a lot into the approved plan, but you could see the campus took up a much 1581 01:59:04,800 --> 01:59:09,760 larger footprint, included a high school at that time. 1582 01:59:09,760 --> 01:59:12,560 They extended all the way north to Vintage. 1583 01:59:12,560 --> 01:59:18,880 There was a driveway access point to Vintage, which will remain in the revision, as well 1584 01:59:18,880 --> 01:59:22,520 as one access point to John Payne. 1585 01:59:22,520 --> 01:59:28,440 The proposed plan, which is on the right, would meet all PD setbacks, building heights, 1586 01:59:28,440 --> 01:59:29,960 not coverage. 1587 01:59:29,960 --> 01:59:33,440 They are only proposing the K-8 at this time. 1588 01:59:33,440 --> 01:59:37,440 Once again, the high school may come forward, but it would require another plan development 1589 01:59:37,440 --> 01:59:38,920 amendment. 1590 01:59:38,920 --> 01:59:41,000 They are proposing 130 spaces. 1591 01:59:41,000 --> 01:59:43,480 There are a lot more spaces shown on the site plan. 1592 01:59:43,480 --> 01:59:48,880 Those are ghosted in, kind of grayed out, and that's just to see where that parking 1593 01:59:48,880 --> 01:59:52,320 would potentially go with the high school. 1594 01:59:52,320 --> 01:59:56,880 And then, as I mentioned, there's also space for that high school, as well as athletic 1595 01:59:56,880 --> 01:59:59,640 fields, to support that. 1596 01:59:59,640 --> 02:00:04,280 Access has changed a little bit in that there is still that same access point on the north 1597 02:00:04,280 --> 02:00:10,240 side, but then there are two proposed access points on John Payne, which allows vehicle 1598 02:00:10,240 --> 02:00:11,520 circulation. 1599 02:00:11,520 --> 02:00:14,000 And just to point out, John Payne isn't there right now. 1600 02:00:14,000 --> 02:00:15,760 It is a mobility plan road. 1601 02:00:15,760 --> 02:00:18,460 It's intended for a secondary arterial. 1602 02:00:18,460 --> 02:00:22,100 This is kind of the first leg of it on the north side. 1603 02:00:22,100 --> 02:00:25,040 It will eventually connect south. 1604 02:00:25,040 --> 02:00:29,740 So this is kind of the first part of it in this area. 1605 02:00:29,740 --> 02:00:34,600 And then you could see the buildings, the proposed buildings, outlined in blue, as well 1606 02:00:34,600 --> 02:00:36,740 as the play area. 1607 02:00:36,740 --> 02:00:41,960 The line in pink shows kind of where those drive aisles are. 1608 02:00:41,960 --> 02:00:45,800 A little bit about transportation and traffic management, because it's always something 1609 02:00:45,800 --> 02:00:48,960 that comes up, especially when we're talking about schools. 1610 02:00:48,960 --> 02:00:53,720 They did update their TIA that was originally approved in 2020. 1611 02:00:53,720 --> 02:00:57,400 There have been some changes in the area, as we discussed in work session. 1612 02:00:57,400 --> 02:00:59,440 The multifamily has been constructed. 1613 02:00:59,440 --> 02:01:01,080 There's commercial development. 1614 02:01:01,080 --> 02:01:02,600 Just a lot of differences in the area. 1615 02:01:02,600 --> 02:01:05,720 So they needed to update that TIA. 1616 02:01:05,720 --> 02:01:08,840 Our transportation folks have reviewed it and approved it. 1617 02:01:08,840 --> 02:01:16,680 And those lines in red are the system improvements that they need to make for this project. 1618 02:01:16,680 --> 02:01:23,020 So they rely on those turn lanes to allow parents or people entering the site to get 1619 02:01:23,020 --> 02:01:27,240 out of those lanes of traffic so they can make safe turning movements. 1620 02:01:27,240 --> 02:01:33,360 So both a left turn lane and a right turn lane off of Vintage onto John Payne. 1621 02:01:33,360 --> 02:01:38,160 And then two turn lanes into the school site off of John Payne. 1622 02:01:38,160 --> 02:01:42,520 And then one on John Payne, as one would turn right onto Vintage. 1623 02:01:42,520 --> 02:01:48,040 It's important to note that they have looked at the circulation on site. 1624 02:01:48,040 --> 02:01:53,440 The Northern driveway would not be available to parents during drop off or pick up. 1625 02:01:53,440 --> 02:01:57,160 That is something that they are going to disallow. 1626 02:01:57,160 --> 02:02:04,520 And that the parents will have to navigate through a loop system off of the John Payne 1627 02:02:04,520 --> 02:02:06,080 exit or entrance. 1628 02:02:06,080 --> 02:02:11,320 And you can see that they've done that analysis for the queuing to ensure that there's sufficient 1629 02:02:11,320 --> 02:02:12,320 space. 1630 02:02:12,320 --> 02:02:17,200 The criteria for approval for a plan development amendment are in subchapter two. 1631 02:02:17,200 --> 02:02:22,000 We won't go over all of them today because it is really kind of just that site plan approval. 1632 02:02:22,000 --> 02:02:26,400 But it is consistent with the criteria for approval, both the general and specific. 1633 02:02:26,400 --> 02:02:34,800 And just kind of highlighting that, it's consistent with our Denton 2040 comprehensive plan, both 1634 02:02:34,800 --> 02:02:40,320 in the future land use as well as in our economic vitality goals and our mobility policies. 1635 02:02:40,320 --> 02:02:47,160 It meets the PD development standards, provides that adequate roadway improvements, that queuing 1636 02:02:47,160 --> 02:02:50,160 the traffic management. 1637 02:02:50,160 --> 02:02:56,440 Any future additions to the site would require additional public hearings or potentially 1638 02:02:56,440 --> 02:03:01,280 zoning the property out of the PD if that's what they choose to do in the future. 1639 02:03:01,280 --> 02:03:05,920 And then it just provides another educational opportunity in this part of Denton. 1640 02:03:05,920 --> 02:03:11,560 So when you look at the DISD schools, there's not a lot of them are just really close. 1641 02:03:11,560 --> 02:03:15,920 So it'll provide an additional educational opportunity. 1642 02:03:15,920 --> 02:03:17,640 Public outreach was sent out. 1643 02:03:17,640 --> 02:03:19,840 We didn't receive any letters back. 1644 02:03:19,840 --> 02:03:25,680 I believe there was a comment that was provided today and was sent to you in favor of the 1645 02:03:25,680 --> 02:03:26,680 request. 1646 02:03:26,680 --> 02:03:31,120 And so staff recommends approval of the request as it complies with the applicable criteria. 1647 02:03:31,120 --> 02:03:37,000 If it moves forward tonight with a recommendation, it would go to city council public hearing 1648 02:03:37,000 --> 02:03:40,240 on November 18th, so next month. 1649 02:03:40,240 --> 02:03:41,800 I'll be happy to answer any questions. 1650 02:03:41,800 --> 02:03:47,760 The applicant is also here and will be available to answer any questions. 1651 02:03:47,760 --> 02:03:51,160 Any questions for staff? 1652 02:03:51,160 --> 02:03:54,880 I will open the public hearing at this time. 1653 02:03:54,880 --> 02:03:58,560 Yeah, Commissioner MacDuff. 1654 02:03:58,560 --> 02:04:01,880 Yes, I'm sure it's in here. 1655 02:04:01,880 --> 02:04:07,600 I can't recall it immediately, but why are we removing the proposed high school? 1656 02:04:07,600 --> 02:04:09,800 It's just something that they're not. 1657 02:04:09,800 --> 02:04:12,120 They're phasing the project. 1658 02:04:12,120 --> 02:04:17,040 They do anticipate, and the applicant is here, they do anticipate that it will come in the 1659 02:04:17,040 --> 02:04:18,040 future. 1660 02:04:18,040 --> 02:04:19,040 It's just this first phase. 1661 02:04:19,040 --> 02:04:21,880 They're not ready to move forward with those plans just yet. 1662 02:04:21,880 --> 02:04:25,680 Okay, thank you. 1663 02:04:25,680 --> 02:04:34,360 And I have a question, Julie. 1664 02:04:34,360 --> 02:04:40,960 I'm just trying to make sure I'm interpreting the PD development plan correctly. 1665 02:04:40,960 --> 02:04:47,240 Because the northern, I believe north is up on the site plan, right? 1666 02:04:47,240 --> 02:04:48,240 Correct. 1667 02:04:48,240 --> 02:04:56,360 Because the northern lot, that lot two is segmented out for later, normally I think 1668 02:04:56,360 --> 02:05:02,040 we wouldn't require perimeter street improvements on a lot that's not being developed. 1669 02:05:02,040 --> 02:05:08,320 In this case, are we requiring that sidewalk along that eastern driveway to be done with 1670 02:05:08,320 --> 02:05:09,320 this phase? 1671 02:05:09,320 --> 02:05:11,680 That is a great question, yes. 1672 02:05:11,680 --> 02:05:18,360 With this development, they will have to build half of John Payne Road and dedicate the necessary 1673 02:05:18,360 --> 02:05:19,360 right of way. 1674 02:05:19,360 --> 02:05:25,000 They'll also have to build that sidewalk, the pedestrian pathway from vintage to their 1675 02:05:25,000 --> 02:05:29,280 entrance to their property to provide the connectivity for students if students were 1676 02:05:29,280 --> 02:05:30,280 local. 1677 02:05:30,280 --> 02:05:35,520 Okay, thank you. 1678 02:05:35,520 --> 02:05:36,520 This is a public hearing. 1679 02:05:36,520 --> 02:05:44,040 I don't have any cards filled out at this time, but if anybody would like to say something, 1680 02:05:44,040 --> 02:05:47,040 you're welcome to. 1681 02:05:47,040 --> 02:05:51,440 I actually have a question for the applicant if you'd like to come up just to answer a 1682 02:05:51,440 --> 02:05:52,440 question. 1683 02:05:52,440 --> 02:05:55,520 You're welcome to share it more as well, if you could identify yourself. 1684 02:05:55,520 --> 02:05:59,320 Yes, my name's Matthew Bull, how are you doing today, sir? 1685 02:05:59,320 --> 02:06:05,200 You may not be aware of this because it's in esoteric details of how code gets developed, 1686 02:06:05,200 --> 02:06:10,400 but a couple of years ago at the request of the Denton Independent School District, we 1687 02:06:10,400 --> 02:06:17,960 actually increased the number of parking spaces that we require for various school types. 1688 02:06:17,960 --> 02:06:29,080 Then we made sure that we had a provision in the code to allow schools to provide alternate 1689 02:06:29,080 --> 02:06:33,280 documentation if they didn't need that many parking spaces, for instance. 1690 02:06:33,280 --> 02:06:37,640 Was that brought up during the development process with staff, and was that something 1691 02:06:37,640 --> 02:06:38,840 you pursued or chose not to? 1692 02:06:38,840 --> 02:06:42,040 It has not been brought up with me yet, but if that was something that I could honestly 1693 02:06:42,040 --> 02:06:48,120 talk to Mr. Westlake about and make sure that we have everything that you all need for that. 1694 02:06:48,120 --> 02:06:51,160 To be clear, I trust you all to decide the right things. 1695 02:06:51,160 --> 02:06:56,360 I just don't want to inadvertently increase the cost of education by building parking spaces 1696 02:06:56,360 --> 02:06:57,360 that aren't needed. 1697 02:06:57,360 --> 02:07:00,440 No, we want to do whatever we want, this has been a long time coming for us. 1698 02:07:00,440 --> 02:07:04,920 I don't know if you all know the whole history of Denton Classical, but this is not the first 1699 02:07:04,920 --> 02:07:09,660 location we've purchased, and so we're excited to be here, we're excited to grow, and we're 1700 02:07:09,660 --> 02:07:15,520 excited to move forward with the next steps for our students, so yes. 1701 02:07:15,520 --> 02:07:17,520 Any questions for the applicant? 1702 02:07:17,520 --> 02:07:18,640 I haven't seen any. 1703 02:07:18,640 --> 02:07:19,640 Thank you very much. 1704 02:07:19,640 --> 02:07:23,680 Thank you so much. 1705 02:07:23,680 --> 02:07:28,240 Any other members of the public wanting to speak, not seeing any movement, I'll close 1706 02:07:28,240 --> 02:07:30,720 the public hearing and open the floor. 1707 02:07:30,720 --> 02:07:33,120 We have a motion, Commissioner Riggs. 1708 02:07:33,120 --> 02:07:39,020 Yes, I'll make a motion to recommend this to council as recommended by staff. 1709 02:07:39,020 --> 02:07:40,020 And Commissioner MacDuff. 1710 02:07:40,020 --> 02:07:49,000 Yes, I'll second that motion to Commissioner Riggs. 1711 02:07:49,000 --> 02:08:00,160 Very good, I'll just say I'm glad that this is able to move forward, glad that the sidewalk 1712 02:08:00,160 --> 02:08:09,160 provision is there, I do yearn for a day when the backs of residential subdivisions would 1713 02:08:09,160 --> 02:08:14,840 have permeability so that people wouldn't have to walk around onto Vintage to get here, 1714 02:08:14,840 --> 02:08:21,760 but that was a while ago that that was decided. 1715 02:08:21,760 --> 02:08:27,400 Not seeing any other questions, sorry. 1716 02:08:27,400 --> 02:08:35,560 Yes, on the board is the agenda item, and we have a motion to approve. 1717 02:08:35,560 --> 02:08:44,200 Yeah, I think it updated when the motion was made. 1718 02:08:44,200 --> 02:08:46,480 Any other questions? 1719 02:08:46,480 --> 02:09:14,680 Not seeing any, I'll call for a vote on the board. 1720 02:09:14,680 --> 02:09:21,960 And that item passes 7-0, brings us to our last public hearing of the evening. 1721 02:09:21,960 --> 02:09:23,960 Item 5C, PD25-0004. 1722 02:09:23,960 --> 02:09:38,760 Okay, good evening Chair, members of the commission, Angie Manglaris, Assistant Planning Director 1723 02:09:38,760 --> 02:09:42,920 here to present PD25-0004, Brush Creek Center. 1724 02:09:42,920 --> 02:09:47,800 A little bit of background on this project, this is a request to rezone from Residential 1725 02:09:47,800 --> 02:09:52,520 1 to plan development with a base zoning of suburban corridor. 1726 02:09:52,520 --> 02:09:56,780 This is a plan development overlay, so with this they are imposing some additional conditions 1727 02:09:56,780 --> 02:10:00,520 upon themselves, but it's not that detailed site plan like we just saw with the charter 1728 02:10:00,520 --> 02:10:02,440 school plan development. 1729 02:10:02,440 --> 02:10:08,600 This is a 2.63 acre site, it is located at the northeast intersection of US 377 and Brush 1730 02:10:08,600 --> 02:10:09,600 Creek Road. 1731 02:10:09,600 --> 02:10:13,040 Currently, it is unimproved and consists of open pasture. 1732 02:10:13,040 --> 02:10:18,840 It is part of a larger 18 acre tract that is situated at that northeast corner. 1733 02:10:18,840 --> 02:10:24,560 The remainder is zoned PDR4 and that zoning change occurred late last year. 1734 02:10:24,560 --> 02:10:28,120 The future land use, we'll get more into it, but it is designated as neighborhood mixed 1735 02:10:28,120 --> 02:10:33,360 use and surrounding it is existing PD to the east, north, and west, as well as some R2 1736 02:10:33,360 --> 02:10:35,600 to the south. 1737 02:10:35,600 --> 02:10:40,800 This is situated at the northeast intersection of US 377 and Brush Creek Road. 1738 02:10:40,800 --> 02:10:45,120 US 377 is a north-south roadway owned and maintained by TechStat. 1739 02:10:45,120 --> 02:10:51,160 It is designated as a primary arterial with a planned build out of six lanes undivided. 1740 02:10:51,160 --> 02:10:53,400 And Brush Creek Road runs east-west. 1741 02:10:53,400 --> 02:10:56,200 It is situated along the south of the property line. 1742 02:10:56,200 --> 02:11:01,080 It is also designated as a primary arterial and will serve as a regional east-west connection 1743 02:11:01,080 --> 02:11:06,920 throughout the entire city, ultimately connecting to I-35W. 1744 02:11:06,920 --> 02:11:10,960 Staff did review this project against our criteria for approval and do find that it 1745 02:11:10,960 --> 02:11:13,120 meets these criteria. 1746 02:11:13,120 --> 02:11:18,680 More specifically, this particular area is primarily designated neighborhood mixed use. 1747 02:11:18,680 --> 02:11:23,320 It does call for the predominant use to be residential, but also notes that local serving 1748 02:11:23,320 --> 02:11:28,560 retail and service uses are appropriate in this area, particularly where there are areas 1749 02:11:28,560 --> 02:11:32,640 of future development as we see this area of the city continue to grow. 1750 02:11:32,640 --> 02:11:37,320 This will provide neighborhood serving retail and services that are critical to achieving 1751 02:11:37,320 --> 02:11:39,880 our balance and accessible neighborhoods. 1752 02:11:39,880 --> 02:11:44,480 The SC Zoning District is designed to be situated along moderate to high intensity corridors 1753 02:11:44,480 --> 02:11:48,040 and provide commercial, office, and retail uses. 1754 02:11:48,040 --> 02:11:53,120 As part of this PD overlay, they are prohibiting the more intensive land uses that would otherwise 1755 02:11:53,120 --> 02:11:57,480 be allowed in the Suburban Corridor Zoning District, helping to ensure compatibility 1756 02:11:57,480 --> 02:12:03,080 between that future use and existing and developing single-family residential in the vicinity 1757 02:12:03,080 --> 02:12:05,360 of the project. 1758 02:12:05,360 --> 02:12:10,560 This is an example of what you found in your backup as part of the PD overlay standards. 1759 02:12:10,560 --> 02:12:15,000 So the intent of the PD overlay is really to ensure that this is consistent with land 1760 02:12:15,000 --> 02:12:20,480 use patterns that you would expect to find along US 377 and won't introduce any incompatible 1761 02:12:20,480 --> 02:12:22,320 activities to the area. 1762 02:12:22,320 --> 02:12:28,800 The applicant is proposing to explicitly prohibit about 15 land uses in the SC Zoning District 1763 02:12:28,800 --> 02:12:31,760 that are typically associated with a little bit higher intensity. 1764 02:12:31,760 --> 02:12:38,520 So those uses that you see in that third column there are being prohibited from being developed 1765 02:12:38,520 --> 02:12:42,840 on this particular property, whereas they would otherwise be allowable in the SC Zoning 1766 02:12:42,840 --> 02:12:43,840 District. 1767 02:12:43,840 --> 02:12:48,280 Additionally, the applicant has provided some provisions for the location of the dumpster 1768 02:12:48,280 --> 02:12:53,240 enclosure and screening, ensuring that it's a minimum of 75 feet away from any residential 1769 02:12:53,240 --> 02:12:56,600 structure in addition to our typical screening requirements. 1770 02:12:56,600 --> 02:13:02,480 It does provide for a 10-foot landscape buffer along the northbound shoulder of 377 that 1771 02:13:02,480 --> 02:13:07,240 needs to be outside of the right-of-way, as well as any future public utility easements, 1772 02:13:07,240 --> 02:13:12,200 and does allow for continuity of existing roadway conditions for non-motorized users 1773 02:13:12,200 --> 02:13:15,720 of US 377. 1774 02:13:15,720 --> 02:13:20,560 Public outreach was conducted in accordance with state law, as well as city ordinances. 1775 02:13:20,560 --> 02:13:23,340 We did receive three responses in favor. 1776 02:13:23,340 --> 02:13:27,440 Those were one owner who owns multiple parcels within the area. 1777 02:13:27,440 --> 02:13:34,040 The applicant did hold three neighborhood meetings since April of 2025 of this year. 1778 02:13:34,040 --> 02:13:37,240 And staff is recommending approval of this request as it complies with their criteria 1779 02:13:37,240 --> 02:13:38,240 for approval. 1780 02:13:38,240 --> 02:13:42,920 It is tentatively scheduled for city council on December 2nd, and I'm happy to answer any 1781 02:13:42,920 --> 02:13:44,400 questions you may have. 1782 02:13:44,400 --> 02:13:48,720 The applicant is also here and I believe has a brief presentation for you all. 1783 02:13:48,720 --> 02:13:49,720 Okay. 1784 02:13:49,720 --> 02:13:51,920 Any questions for staff at this time? 1785 02:13:51,920 --> 02:13:58,160 I don't see it. 1786 02:13:58,160 --> 02:14:04,960 I will open the public hearing at this time and ask Mr. Trey Jacobson, is that correct? 1787 02:14:04,960 --> 02:14:07,440 You can come down. 1788 02:14:07,440 --> 02:14:13,480 And as the applicant representative, you and whoever else would like to speak on behalf 1789 02:14:13,480 --> 02:14:18,700 of the applicant have a total of 20 minutes, however you want to divvy that up. 1790 02:14:18,700 --> 02:14:19,700 Well thank you, Chair. 1791 02:14:19,700 --> 02:14:25,400 I promise not to take that 20 minutes from you, just Chair and members of the commission. 1792 02:14:25,400 --> 02:14:26,400 My name is Trey Jacobson. 1793 02:14:26,400 --> 02:14:31,160 I'm a land use consultant, and for the record, I'm addressed at 124 East Edgewood Place in 1794 02:14:31,160 --> 02:14:33,240 San Antonio, Texas. 1795 02:14:33,240 --> 02:14:36,600 And I'm representing the prospective buyer and developer of this site. 1796 02:14:36,600 --> 02:14:40,640 I should also mention we have the consulting engineers from Anhard here if there's any 1797 02:14:40,640 --> 02:14:42,680 particular questions that you may have. 1798 02:14:42,680 --> 02:14:48,600 Angie did such a good job with her presentation, I'm going to go ahead and really skip to the 1799 02:14:48,600 --> 02:14:49,600 aspects of it. 1800 02:14:49,600 --> 02:14:55,840 I did want to stress that while this is not yet a future major intersection, this is where 1801 02:14:55,840 --> 02:15:01,540 two major thoroughfares are going to cross and it will be in the not too distant future. 1802 02:15:01,540 --> 02:15:07,080 So just stepping back from a land use standpoint, the fact that it is at that major intersection 1803 02:15:07,080 --> 02:15:11,040 and as it's consistent with the future land use plans, there's no environmentally sensitive 1804 02:15:11,040 --> 02:15:12,040 areas in it. 1805 02:15:12,040 --> 02:15:16,960 This kind of makes it, just from a pure land use standpoint, a perfect commercial corner, 1806 02:15:16,960 --> 02:15:19,800 which is one of the things that has attracted the interest in this project. 1807 02:15:19,800 --> 02:15:24,720 And we're simply looking at more of a highway, as you would see on Forward Drive, a highway 1808 02:15:24,720 --> 02:15:26,680 oriented commercial retail center. 1809 02:15:26,680 --> 02:15:30,480 I can't tell you who's going to be there, and I don't know the exact configuration, 1810 02:15:30,480 --> 02:15:34,040 and we needed that flexibility as this site is ultimately developed. 1811 02:15:34,040 --> 02:15:37,880 And that's why we originally went with straight SC. 1812 02:15:37,880 --> 02:15:43,000 Now we ultimately rolled that back to a PD overlay, because we agree, in fact, we propose 1813 02:15:43,000 --> 02:15:44,760 that there's a lot of incompatibility. 1814 02:15:44,760 --> 02:15:47,880 So this is more like SC light, as we were proposing it. 1815 02:15:47,880 --> 02:15:52,480 But as this is a conceptual site plan that we've been working with the neighborhood on, 1816 02:15:52,480 --> 02:15:57,360 this shows that two entry points that are permissible, given the entryways, as well 1817 02:15:57,360 --> 02:16:01,480 as the right of way dedications that are ultimately going to be required, there's a lot of infrastructure 1818 02:16:01,480 --> 02:16:06,520 that's ultimately going to be built, including roadway and turn lane expansion from 377. 1819 02:16:06,520 --> 02:16:11,480 We have to build the north half of Brush Creek, again, as a major arterial, and improve it 1820 02:16:11,480 --> 02:16:15,480 along with all the pedestrian mobility and landscaping that's going to go on. 1821 02:16:15,480 --> 02:16:17,480 That will be part of this project. 1822 02:16:17,480 --> 02:16:22,480 This shows a single 13,700 square foot building. 1823 02:16:22,480 --> 02:16:28,200 Now this is just meant to be a contemplative analysis around how much could theoretically 1824 02:16:28,200 --> 02:16:31,960 you put on the site with all the required parking, and for a sense of scale, if you're 1825 02:16:31,960 --> 02:16:37,080 wondering what that looks like, that's like a Walgreens, a CVS, a Trader Joe's. 1826 02:16:37,080 --> 02:16:38,200 That's the size. 1827 02:16:38,200 --> 02:16:39,520 So that's the maximum potential. 1828 02:16:39,520 --> 02:16:42,920 But that's really not what's envisioned here. 1829 02:16:42,920 --> 02:16:49,960 We're envisioning more of a multi-tenant retail with upgraded aesthetics to it. 1830 02:16:49,960 --> 02:16:52,800 We let our architectural team run wild. 1831 02:16:52,800 --> 02:16:53,960 This is one concept. 1832 02:16:53,960 --> 02:16:54,960 This is another concept. 1833 02:16:54,960 --> 02:16:58,920 This just shows a four bay type of approach. 1834 02:16:58,920 --> 02:17:03,800 Just to, again, this is not ultimately what it's going to look like, or how we could ultimately 1835 02:17:03,800 --> 02:17:04,800 defect. 1836 02:17:04,800 --> 02:17:06,960 This one shows the division between the two buildings. 1837 02:17:06,960 --> 02:17:10,760 So there's a lot of flexibility that could ultimately take place. 1838 02:17:10,760 --> 02:17:13,120 So we already talked about the PD overlay. 1839 02:17:13,120 --> 02:17:18,240 If you're familiar with the Viridian project, which is at 500 Fort Worth Drive, this is also 1840 02:17:18,240 --> 02:17:19,400 SC zoning. 1841 02:17:19,400 --> 02:17:20,400 This is a straight SC. 1842 02:17:20,400 --> 02:17:25,480 But this kind of gives you a sense of a comparable sized type of project like that to give you 1843 02:17:25,480 --> 02:17:29,240 a sense of flavor for how it would fit in with the site. 1844 02:17:29,240 --> 02:17:33,000 I think it's important to talk about the community engagement, and Angie mentioned in her presentation 1845 02:17:33,000 --> 02:17:34,000 we had a number of meetings. 1846 02:17:34,000 --> 02:17:37,400 We've been engaging with the community all the way back to January in this, including 1847 02:17:37,400 --> 02:17:42,360 surveys of the neighbors within 500 feet, asking them for their input on their concerns 1848 02:17:42,360 --> 02:17:43,360 on the site. 1849 02:17:43,360 --> 02:17:44,680 We've taken those. 1850 02:17:44,680 --> 02:17:48,200 We worked with them in designing the site, explaining how this is done. 1851 02:17:48,200 --> 02:17:53,760 We also went through some of the zoning options, hearing what their concerns are around land 1852 02:17:53,760 --> 02:17:54,760 use and compatibility. 1853 02:17:54,760 --> 02:17:58,760 A lot of the -- a number of the uses that are on the list of what are prohibited uses 1854 02:17:58,760 --> 02:18:02,160 actually came from the neighbors, and we really appreciated all their engagement. 1855 02:18:02,160 --> 02:18:06,640 And even we had a meeting just a few weeks ago as this was starting to head to P&Z. 1856 02:18:06,640 --> 02:18:10,640 So the list, I think, was already shown to -- and it's in your packet. 1857 02:18:10,640 --> 02:18:11,640 I won't belabor that. 1858 02:18:11,640 --> 02:18:13,360 I'm happy to go back if you'd like. 1859 02:18:13,360 --> 02:18:15,760 And we just talked about some of the development standards. 1860 02:18:15,760 --> 02:18:21,520 So I don't want to take any more time, but really, Angie did such a great job with the 1861 02:18:21,520 --> 02:18:22,520 presentation. 1862 02:18:22,520 --> 02:18:29,200 So if you could answer any questions, you all might have. 1863 02:18:29,200 --> 02:18:35,160 Any questions from the commission? 1864 02:18:35,160 --> 02:18:36,160 Commissioner MacDuff? 1865 02:18:36,160 --> 02:18:41,440 Yes, I just have a comment, and of course, yes, certainly the staff has done a great 1866 02:18:41,440 --> 02:18:42,440 job on this. 1867 02:18:42,440 --> 02:18:49,760 I think this is an exemplary model for use of an overlay plan development. 1868 02:18:49,760 --> 02:18:51,920 So thank you, Mr. Jacobson, for this. 1869 02:18:51,920 --> 02:18:53,500 I appreciate that. 1870 02:18:53,500 --> 02:19:06,600 And certainly a relevant way to address the neighbors' concerns. 1871 02:19:06,600 --> 02:19:08,520 This is a public hearing. 1872 02:19:08,520 --> 02:19:16,280 If anyone else would like to come and speak, you're welcome to -- oh, I'm sorry, is this 1873 02:19:16,280 --> 02:19:17,280 Andrew Belter? 1874 02:19:17,280 --> 02:19:18,280 Yes, this is Andrew Belter. 1875 02:19:18,280 --> 02:19:22,240 I'm going to consult an engineer for this, and I'm just here to answer any questions 1876 02:19:22,240 --> 02:19:24,400 you have on the engineering side of things. 1877 02:19:24,400 --> 02:19:25,400 Thank you. 1878 02:19:25,400 --> 02:19:26,880 Appreciate you being here. 1879 02:19:26,880 --> 02:19:29,960 Any questions for the applicant's engineering representative? 1880 02:19:29,960 --> 02:19:35,840 I don't see any. 1881 02:19:35,840 --> 02:19:38,280 Thank you. 1882 02:19:38,280 --> 02:19:40,560 With that, I will close the public hearing. 1883 02:19:40,560 --> 02:19:42,240 We have a motion on the board. 1884 02:19:42,240 --> 02:19:43,240 Commissioner Garland? 1885 02:19:43,240 --> 02:19:51,880 I would like to make a motion to approve the zoning change as recommended by city staff. 1886 02:19:51,880 --> 02:19:54,160 Thank you. 1887 02:19:54,160 --> 02:19:55,480 And Commissioner Ketreson? 1888 02:19:55,480 --> 02:19:57,080 I second. 1889 02:19:57,080 --> 02:19:59,420 Commissioner Garland? 1890 02:19:59,420 --> 02:20:00,420 Thank you. 1891 02:20:00,420 --> 02:20:02,000 So we have a motion to approve on the board. 1892 02:20:02,000 --> 02:20:05,000 Any discussion? 1893 02:20:05,000 --> 02:20:11,560 Yeah, I don't have a problem with this. 1894 02:20:11,560 --> 02:20:21,640 I'll just say that we should be careful when we describe the list of uses that are stripped 1895 02:20:21,640 --> 02:20:35,360 out from a -- when we describe the stripped-out uses as more intense, I would not expect multifamily 1896 02:20:35,360 --> 02:20:41,880 housing to be more intense than a 24-hour automotive fuel sales, for instance. 1897 02:20:41,880 --> 02:20:49,260 I understand that happens because of negotiations with nearby property owners, but let's just 1898 02:20:49,260 --> 02:20:52,280 be careful how we message that. 1899 02:20:52,280 --> 02:20:58,960 Any other questions on the commission? 1900 02:20:58,960 --> 02:20:59,960 Not seeing any. 1901 02:20:59,960 --> 02:21:08,000 We'll call for a vote on the board. 1902 02:21:08,000 --> 02:21:09,880 And the item passes 7-0. 1903 02:21:09,880 --> 02:21:14,000 Thank you. 1904 02:21:14,000 --> 02:21:24,840 That brings us to item 6A, the planning and zoning commission matrix. 1905 02:21:24,840 --> 02:21:25,840 Good evening. 1906 02:21:25,840 --> 02:21:30,660 With respect to the matrix, I believe we captured all of the recently requested items on there, 1907 02:21:30,660 --> 02:21:34,280 so we will get to work on addressing those. 1908 02:21:34,280 --> 02:21:37,840 A couple of council updates for you all. 1909 02:21:37,840 --> 02:21:43,280 The Comprehensive Plan Amendment that was recently presented at 380 -- along the 380 1910 02:21:43,280 --> 02:21:49,240 corridor was approved by council, as well as the two recent zoning change requests for 1911 02:21:49,240 --> 02:21:54,000 Suburban Corridor up at Loop 288 and Sherman. 1912 02:21:54,000 --> 02:21:55,240 Those were approved as well. 1913 02:21:55,240 --> 02:21:59,640 And then last night, we were very happy to get a unanimous approval from council for 1914 02:21:59,640 --> 02:22:05,720 the downtown rezoning, so a great step forward for our Design Downtown Denton plan and its 1915 02:22:05,720 --> 02:22:07,620 implementation. 1916 02:22:07,620 --> 02:22:12,280 And then one item I did want to note for everyone, because I don't know if you heard the discussions 1917 02:22:12,280 --> 02:22:17,240 after the work session, you all received an invitation this evening that was forwarded 1918 02:22:17,240 --> 02:22:22,740 to the city for an event associated with the landmark development. 1919 02:22:22,740 --> 02:22:27,920 Because that event is not a public type event that the city can post a notice of possible 1920 02:22:27,920 --> 02:22:32,520 quorum for, we would ask that you all monitor yourselves if you choose to go and make sure 1921 02:22:32,520 --> 02:22:36,000 that four of you are not in attendance at the same time at that meeting. 1922 02:22:36,000 --> 02:22:40,520 So limit it to only three of you should you choose to go to the event, please. 1923 02:22:40,520 --> 02:22:43,440 And that is all I have. 1924 02:22:43,440 --> 02:22:47,520 And I believe that event is probably a come and go sort of thing. 1925 02:22:47,520 --> 02:22:58,600 So just to avoid any extended discussions or roaming quorums, would it be appropriate 1926 02:22:58,600 --> 02:23:04,040 for us to notify the secretary if we plan to go so that she can monitor if there's an 1927 02:23:04,040 --> 02:23:05,040 issue? 1928 02:23:05,040 --> 02:23:09,960 I just, I don't necessarily want to, I'm happy to, but I don't want to suggest that people 1929 02:23:09,960 --> 02:23:13,360 should contact me if I'm setting up an issue then. 1930 02:23:13,360 --> 02:23:21,640 I mean, I would say it's a come and go, I don't know, because I've been to some of their 1931 02:23:21,640 --> 02:23:28,640 events when they opened up like Pecan Square, Treeline, sometimes they say a few words and 1932 02:23:28,640 --> 02:23:29,880 they talk about things. 1933 02:23:29,880 --> 02:23:36,360 So I mean, it is four to seven, that's three hours, that is a long event, but I don't, 1934 02:23:36,360 --> 02:23:37,760 it could go either way. 1935 02:23:37,760 --> 02:23:38,760 Okay. 1936 02:23:38,760 --> 02:23:43,720 Sure, so yes, if you all do want to email myself or Kathy, we can let you know if we 1937 02:23:43,720 --> 02:23:46,480 hear from more than three who plan to attend. 1938 02:23:46,480 --> 02:23:49,660 And in that instance, I would just ask that those of you that are present kind of coordinate 1939 02:23:49,660 --> 02:23:53,040 amongst yourselves to see who would be willing to step out. 1940 02:23:53,040 --> 02:23:54,040 Thank you. 1941 02:23:54,040 --> 02:23:56,240 I appreciate that. 1942 02:23:56,240 --> 02:24:03,560 Any items to add to the matrix from the commission? 1943 02:24:03,560 --> 02:24:07,800 Seeing none, that brings us to item seven, concluding items. 1944 02:24:07,800 --> 02:24:15,240 Any concluding items to remind us of? 1945 02:24:15,240 --> 02:24:25,840 I have one, early voting, I believe, is going on now until through Saturday the 30th. 1946 02:24:25,840 --> 02:24:29,360 I'm going to mess this up, I should have booked this up, I apologize. 1947 02:24:29,360 --> 02:24:32,200 Somebody who's more civic than me, tell me what the right thing is. 1948 02:24:32,200 --> 02:24:42,440 I believe it's through next Friday, through the 31st of October, and then election day 1949 02:24:42,440 --> 02:24:45,680 is on November 4th. 1950 02:24:45,680 --> 02:24:52,080 So do your duty and privilege as you may. 1951 02:24:52,080 --> 02:24:57,160 Seeing nothing else, I will adjourn our meeting of the Planning and Zoning Commission. 1952 02:24:57,160 --> 02:24:58,160 Thank you everyone. 1953 02:24:58,160 --> 02:24:59,280 At seven, eight.