 Good afternoon at 512 this afternoon, on August 27th, I will call the work session of the

00:00:10.800 --> 00:00:14.440
 Denton Planning and Zoning Commission to order.

00:00:14.440 --> 00:00:29.640
 I don't see any citizen comments on the consent agenda, so we will work through our meeting

00:00:29.640 --> 00:00:36.400
 agenda.

00:00:36.400 --> 00:00:44.160
 Any questions on the consent agenda from the commission?

00:00:44.160 --> 00:00:49.800
 That brings up our individual consideration items.

00:00:49.800 --> 00:00:55.800
 One of these, I have to look up the actual number, there was a request for extension

00:00:55.800 --> 00:01:06.960
 mailed in, item B, thank you, that is item 4B, so that will be requested to be extended

00:01:06.960 --> 00:01:34.880
 to September 9th, sorry, 24th, I'm not doing math this evening, and I guess item 4C, that

00:01:34.880 --> 00:01:40.400
 one has an extension request as well, are there any questions on that one?

00:01:40.400 --> 00:01:43.480
 No, okay.

00:01:43.480 --> 00:01:49.360
 So then we have one public hearing this evening.

00:01:49.360 --> 00:01:56.240
 Good evening, Julie Wyatt, principal planner.

00:01:56.240 --> 00:02:07.960
 Okay, all right, this evening I'm presenting to you Z258 cat 35, we'll just talk about

00:02:07.960 --> 00:02:11.640
 a summary at work session, we can go over any questions that you may have, and I have

00:02:11.640 --> 00:02:14.720
 a fuller presentation at the regular meeting.

00:02:14.720 --> 00:02:20.880
 So this request is to rezone the property from PD 142 Hillcrest Center to plan development

00:02:20.880 --> 00:02:27.460
 general office on approximately 68 acres, and the purpose of this is to facilitate the

00:02:27.460 --> 00:02:33.520
 development of an industrial use, they don't have a user in mind, but warehouse light industrial

00:02:33.520 --> 00:02:40.480
 office type space, but know that any use permitted in GEO, if it's approved, could be developed

00:02:40.480 --> 00:02:42.200
 on the site.

00:02:42.200 --> 00:02:46.040
 Staff is recommending approval of the request as it's consistent with the comprehensive

00:02:46.040 --> 00:02:53.040
 plan, as well as the other criteria for approval in the development code.

00:02:53.040 --> 00:02:56.760
 I'll be happy to answer any questions, and the applicant will be here this evening to

00:02:56.760 --> 00:02:58.440
 answer questions as well.

00:02:58.440 --> 00:02:59.440
 Sure.

00:02:59.440 --> 00:03:00.440
 Commissioner Dyer?

00:03:00.440 --> 00:03:02.200
 How did you know?

00:03:02.200 --> 00:03:06.560
 Okay, so just a really quick question on this.

00:03:06.560 --> 00:03:15.480
 I know that the 288 loop is going to be extended on the west side of 35W, is there any planned

00:03:15.480 --> 00:03:21.660
 construction that's going to be needed on this, just on this east side, on the southern

00:03:21.660 --> 00:03:28.400
 portion of this area, that it might affect what we're deciding today for, because I was

00:03:28.400 --> 00:03:33.160
 noticing some of it talked about the landscaping and, you know, this and that.

00:03:33.160 --> 00:03:40.920
 So I didn't know if there was any, you know, future thinking about that, if some of that

00:03:40.920 --> 00:03:44.560
 road work was happening on this, you know, near east side.

00:03:44.560 --> 00:03:45.760
 That is a great question.

00:03:45.760 --> 00:03:50.480
 So TexDOT has acquired some right of way on the south side of the property.

00:03:50.480 --> 00:03:56.720
 You can see that the property line is a little irregular along this frontage.

00:03:56.720 --> 00:04:00.240
 There are plans for improvements.

00:04:00.240 --> 00:04:08.040
 Loop 288 will have frontage roads at some point, all along the north side of the city.

00:04:08.040 --> 00:04:12.760
 And there will also be a direct connector from loop 288 to 35.

00:04:12.760 --> 00:04:18.720
 So think about one of those highways where you just sort of zoom on to 35.

00:04:18.720 --> 00:04:24.920
 So that will -- that is forthcoming.

00:04:24.920 --> 00:04:27.760
 Like I said, TexDOT has acquired right of way.

00:04:27.760 --> 00:04:29.720
 This project is pretty far in the future.

00:04:29.720 --> 00:04:34.720
 I talked to transportation today and they really don't anticipate any movement until

00:04:34.720 --> 00:04:36.920
 at least 2030.

00:04:36.920 --> 00:04:43.560
 So while the 30-foot and 35-foot landscape buffer will hopefully provide some cushion

00:04:43.560 --> 00:04:50.960
 for that, at this point we can't anticipate that far in the future.

00:04:50.960 --> 00:04:56.640
 But we sort of planned it that TexDOT has acquired the right of way that they need,

00:04:56.640 --> 00:04:58.120
 but with that cushion.

00:04:58.120 --> 00:04:59.120
 >> Yeah.

00:04:59.120 --> 00:05:00.120
 >> Yeah.

00:05:00.120 --> 00:05:11.200
 >> The other words embedded in here were entrance to Denton.

00:05:11.200 --> 00:05:19.560
 What kind of work do you anticipate, Julie, on an entrance to Denton?

00:05:19.560 --> 00:05:25.160
 >> So the comprehensive plan identifies areas that are gateways within the city of Denton.

00:05:25.160 --> 00:05:29.480
 And when you think about it, when you're driving south from the north, this is one of the first

00:05:29.480 --> 00:05:32.220
 areas that you see that are within our city.

00:05:32.220 --> 00:05:39.560
 So that was why we negotiated and worked with the property owner to have these overlay conditions.

00:05:39.560 --> 00:05:44.000
 You know, our future land use map shows this as business center.

00:05:44.000 --> 00:05:48.920
 And GO is one of those zoning districts that falls squarely within business center.

00:05:48.920 --> 00:05:55.120
 So generally we would always recommend approval of GO when there's business center, because

00:05:55.120 --> 00:05:58.360
 it's consistent with the future land use map and the comprehensive plan.

00:05:58.360 --> 00:06:03.300
 But given this site's location, we wanted to make sure there was just a little bit extra

00:06:03.300 --> 00:06:05.840
 on it because of the gateway.

00:06:05.840 --> 00:06:11.940
 And so that's why there's that additional landscape in the front, why those dock doors

00:06:11.940 --> 00:06:15.760
 can't face the street, why we've limited that outdoor storage.

00:06:15.760 --> 00:06:20.120
 Just because we want this site, of course we want to have them flexibility so the site

00:06:20.120 --> 00:06:23.540
 stays active and viable for a very long time.

00:06:23.540 --> 00:06:29.760
 But get those assurances that it's going to look nice for a very long time and be that

00:06:29.760 --> 00:06:31.500
 nice gateway for the city.

00:06:31.500 --> 00:06:36.440
 I don't know if you've driven that way in a long time, but there are other buildings

00:06:36.440 --> 00:06:39.620
 and uses that are similar across 35.

00:06:39.620 --> 00:06:46.340
 So just keeping that theming that we anticipate we're going to see the warehouse, the logistics,

00:06:46.340 --> 00:07:02.160
 this type of use in this area, we want to make sure it looks as good as it can.

00:07:02.160 --> 00:07:10.280
 My only question is, I recall several years ago there was an application for rezoning

00:07:10.280 --> 00:07:17.360
 for some sort of truck stops type use on the northeast side of 77 here.

00:07:17.360 --> 00:07:23.260
 And there was a lot of concern in the community and how that would relate to the MPC just

00:07:23.260 --> 00:07:25.000
 northeast of here.

00:07:25.000 --> 00:07:33.600
 Can you help me understand why the level of concern is very different in these two areas

00:07:33.600 --> 00:07:35.420
 across the street from one another?

00:07:35.420 --> 00:07:37.720
 Well staff recommended approval of that.

00:07:37.720 --> 00:07:41.840
 So staff was always in favor of that.

00:07:41.840 --> 00:07:45.280
 And once again, that was one of those where it was an industrial type use consistent with

00:07:45.280 --> 00:07:51.640
 the comprehensive plan, but we worked with them to get those additional design considerations.

00:07:51.640 --> 00:07:55.080
 So staff's position has remained the same.

00:07:55.080 --> 00:08:03.860
 As far as the position of the area, you know, this property is a little bit different than

00:08:03.860 --> 00:08:08.280
 that other site, and that this really is surrounded by highways.

00:08:08.280 --> 00:08:16.000
 We don't anticipate we're going to see a critical mass of residential and walkable, you know,

00:08:16.000 --> 00:08:17.640
 commercial development.

00:08:17.640 --> 00:08:20.820
 This is kind of a good spot for this type of use.

00:08:20.820 --> 00:08:26.720
 So there are opportunities north of this property to have some of that mix of uses.

00:08:26.720 --> 00:08:33.400
 We feel like because it's kind of stuck between all these highways, this use makes sense.

00:08:33.400 --> 00:08:34.400
 Yeah.

00:08:34.400 --> 00:08:35.760
 Thank you.

00:08:35.760 --> 00:08:38.760
 Any other questions?

00:08:38.760 --> 00:08:41.480
 We'll look forward to the full presentation.

00:08:41.480 --> 00:08:44.720
 Thank you.

00:08:44.720 --> 00:08:56.040
 That brings us to our one work session, I believe, if I'm tracking here.

00:08:56.040 --> 00:09:05.160
 Question PZ25171 on traffic impact analysis, it's your favorite topic, Matt, I'm sure.

00:09:05.160 --> 00:09:07.160
 Oh, of course.

00:09:07.160 --> 00:09:09.160
 Love them.

00:09:09.160 --> 00:09:11.160
 All right.

00:09:11.160 --> 00:09:13.160
 Okay.

00:09:13.160 --> 00:09:15.160
 Good.

00:09:15.160 --> 00:09:18.800
 Good evening, Planning Commission.

00:09:18.800 --> 00:09:21.440
 My name is Matt Burdeen, Assistant Planner.

00:09:21.440 --> 00:09:27.480
 So this is part of our Planning Boot Camp series, so they're a series of informational

00:09:27.480 --> 00:09:38.640
 presentations on various planning and development related topics to help you for your understanding.

00:09:38.640 --> 00:09:44.840
 Today's topic is, as I said, traffic impact analysis.

00:09:44.840 --> 00:09:51.040
 So we're going to keep today's confer discussion fairly high level, but on the agenda we're

00:09:51.040 --> 00:09:56.000
 going to look at what is a traffic impact analysis, TIA, its purpose, what goes into

00:09:56.000 --> 00:10:02.320
 it, how does it fit in our overall development review process, and then look at an example

00:10:02.320 --> 00:10:06.840
 project that involved the TIA here in the city.

00:10:06.840 --> 00:10:11.760
 So there's a lot of text on this slide, but the ones to focus on are those bolded ones.

00:10:11.760 --> 00:10:13.240
 And so what is a TIA?

00:10:13.240 --> 00:10:19.800
 So this is a study that developers will do as part of any new project, and it determines

00:10:19.800 --> 00:10:25.320
 the impact of additional traffic generated by proposed development on a city's transportation

00:10:25.320 --> 00:10:26.320
 system.

00:10:26.320 --> 00:10:32.120
 And so the purpose of that TIA can be summed up in this sentence, and that is to protect

00:10:32.120 --> 00:10:36.960
 the community's investment in its own transportation system.

00:10:36.960 --> 00:10:44.520
 So as, you know, it does this by identifying and evaluating the impacts that new development

00:10:44.520 --> 00:10:52.680
 will have on traffic, mainly traffic congestion, as well as traffic safety in the city, and

00:10:52.680 --> 00:10:58.520
 it will make recommendations for addressing the pressure points that that new development

00:10:58.520 --> 00:11:04.760
 will create in order to mitigate any impacts that the new development will have on our

00:11:04.760 --> 00:11:05.840
 city.

00:11:05.840 --> 00:11:11.720
 And so this helps keep our transportation system growing and up to date as new development

00:11:11.720 --> 00:11:15.920
 in the city overall grows as well.

00:11:15.920 --> 00:11:18.320
 So the components are what goes into a TIA.

00:11:18.320 --> 00:11:23.040
 They can be mainly split into, I guess, two different groups.

00:11:23.040 --> 00:11:26.400
 There's the stuff that goes into the TIA and then the parts that come out.

00:11:26.400 --> 00:11:32.720
 And so the stuff that goes in is the input data and parameters.

00:11:32.720 --> 00:11:38.200
 This can be site-specific, so what are the access points for a particular development,

00:11:38.200 --> 00:11:43.720
 what are they proposing to do, and the anticipated traffic development from that.

00:11:43.720 --> 00:11:48.680
 There's also like area-wide or city-wide data and parameters that go into it.

00:11:48.680 --> 00:11:54.260
 What does the mobility plan look like around their site, as well as just general projected

00:11:54.260 --> 00:12:01.720
 population growth and that effect they'll have on our transportation system.

00:12:01.720 --> 00:12:08.740
 All this comes together is calibrated and tabulated and we have the analysis is what

00:12:08.740 --> 00:12:10.080
 comes out of it.

00:12:10.080 --> 00:12:17.000
 It looks at various aspects of our roadways, intersections, the roads themselves, level

00:12:17.000 --> 00:12:22.220
 of service, and then it makes recommended mitigation measures.

00:12:22.220 --> 00:12:27.920
 And those are the things that you'll often see or often comes out, things such as they

00:12:27.920 --> 00:12:33.440
 may be required to add in turn lanes, they may be required to put in signals at intersections

00:12:33.440 --> 00:12:38.600
 or build out roads.

00:12:38.600 --> 00:12:45.220
 So not all developments that we see require a TIA, especially smaller ones like a couple

00:12:45.220 --> 00:12:51.400
 of duplexes, don't really create the traffic that really requires the need for a TIA.

00:12:51.400 --> 00:12:55.320
 We can absorb that pretty quickly.

00:12:55.320 --> 00:13:02.840
 And so here are the seven criteria that if a development meets, we require them to have

00:13:02.840 --> 00:13:04.360
 a TIA.

00:13:04.360 --> 00:13:09.320
 The top three that are highlighted are the ones we see most often are the common and

00:13:09.320 --> 00:13:10.320
 common.

00:13:10.320 --> 00:13:18.080
 Those are if a development creates more or equal to 100 peak hour vehicle trips, so 100

00:13:18.080 --> 00:13:25.760
 trips in an hour, equal to more than 1,000 vehicle trips in a day, or it takes access

00:13:25.760 --> 00:13:34.320
 from a TXDOT roadway and in that case, then they have to re-subject them to TXDOT's TIA

00:13:34.320 --> 00:13:35.320
 requirements.

00:13:35.320 --> 00:13:41.200
 Unlike some other stuff, other applications, a development only really needs to meet one

00:13:41.200 --> 00:13:46.920
 of these criteria in order for us to require them a TIA, but sometimes they meet multiple

00:13:46.920 --> 00:13:51.720
 of them.

00:13:51.720 --> 00:13:57.400
 So how it fits in our overall development review process.

00:13:57.400 --> 00:14:01.640
 So first is the trip generation calculations.

00:14:01.640 --> 00:14:08.200
 So this is where we determine if a TIA analysis is needed in the first place.

00:14:08.200 --> 00:14:15.360
 And so what this is, it's an approximate number of vehicle trips that their project will develop

00:14:15.360 --> 00:14:18.080
 based on their land use.

00:14:18.080 --> 00:14:26.880
 And these calculations come from the IT or International Transportation Engineers manual.

00:14:26.880 --> 00:14:33.080
 Based on that, as well as their criteria, if they need a TIA, we'll ask them to meet

00:14:33.080 --> 00:14:36.640
 with us in what's called a traffic scoping meeting.

00:14:36.640 --> 00:14:40.720
 This is where we go over with the applicant those components.

00:14:40.720 --> 00:14:47.080
 So we make sure that the input data and parameters they're setting on that TIA are correct.

00:14:47.080 --> 00:14:54.780
 They match what we require of them, so that the analysis in the end is correct.

00:14:54.780 --> 00:15:00.900
 And finally, they do the analysis and we review and approve that as well.

00:15:00.900 --> 00:15:06.920
 Those recommendations, as mentioned, get incorporated into any site plans that go along with the

00:15:06.920 --> 00:15:07.920
 project.

00:15:07.920 --> 00:15:15.840
 Additionally, that TIA gets reviewed fairly early on in our development review process.

00:15:15.840 --> 00:15:17.960
 An example is shown on the screen.

00:15:17.960 --> 00:15:26.720
 If zoning has already been established that they are in compliance with, we'll require

00:15:26.720 --> 00:15:33.200
 a TIA with the zoning compliance plan or the site plan, which is first.

00:15:33.200 --> 00:15:38.280
 If they need a planned development, if they're doing a planned development application or

00:15:38.280 --> 00:15:45.040
 a specific use permit, a TIA may be reviewed at the same time of those applications.

00:15:45.040 --> 00:15:53.120
 It is up to staff, they may defer the actual review of such applications for the PD and

00:15:53.120 --> 00:15:57.840
 SUPs at a later date with the civil engineering plans.

00:15:57.840 --> 00:16:00.800
 And that's kind of done at a case-by-case basis.

00:16:00.800 --> 00:16:08.200
 So there is some flexibility with those applications as to when the TIA is reviewed.

00:16:08.200 --> 00:16:16.800
 Regarding where you all fit in to this general process, those recommendations, either signaling,

00:16:16.800 --> 00:16:24.560
 turn lanes, road build out, you may see those in site plans or the ordinances of PD applications

00:16:24.560 --> 00:16:28.080
 or SUP applications, they'd be reflected in there.

00:16:28.080 --> 00:16:33.920
 Additionally, for all other applications, if there is a right-of-way dedication that's

00:16:33.920 --> 00:16:39.640
 required specific to the TIA, that would show up in the final plat.

00:16:39.640 --> 00:16:45.320
 And so that would go before you for your approval there.

00:16:45.320 --> 00:16:47.480
 So fairly light.

00:16:47.480 --> 00:16:53.880
 All right, we're breezing through this.

00:16:53.880 --> 00:16:57.460
 So when I look at an example or a TIA in action.

00:16:57.460 --> 00:17:02.740
 So what we have here is, so this is the Denton Grove Apartments, they're a fairly new apartment

00:17:02.740 --> 00:17:09.320
 complex off of Loop 288, just a bit south of McKinney and in between, yeah, and just

00:17:09.320 --> 00:17:11.320
 north of Dutchess Drive.

00:17:11.320 --> 00:17:17.080
 So back in 2020, they were approved for a specific use permit to allow for multi-family

00:17:17.080 --> 00:17:19.000
 dwelling use.

00:17:19.000 --> 00:17:26.660
 They did have to do a TIA, they met both the peak hour requirement as well as just daily

00:17:26.660 --> 00:17:31.800
 vehicle trips, and they took access from a tech set road.

00:17:31.800 --> 00:17:35.780
 So three of the most common three.

00:17:35.780 --> 00:17:40.820
 Based on that TIA, it was recommended that a signal be added at the intersection of Dutchess

00:17:40.820 --> 00:17:43.240
 Drive and Loop 288.

00:17:43.240 --> 00:17:48.360
 And so as part of approval of the development plans, they agreed to proportionally fund

00:17:48.360 --> 00:17:53.880
 their impact for the installation of a traffic signal at that intersection.

00:17:53.880 --> 00:17:59.160
 So to help improve the safety as well as flow of traffic in the area.

00:17:59.160 --> 00:18:08.800
 Finally, there's several resources that speak to roadways, transportation, specifically

00:18:08.800 --> 00:18:16.400
 if you want to look a little bit more into TIAs, our design criteria manual outlines

00:18:16.400 --> 00:18:24.200
 those requirements for when we require it and what goes into those analysis.

00:18:24.200 --> 00:18:42.800
 And that is, for me, fairly high level, but happy to answer any questions.

00:18:42.800 --> 00:18:49.400
 I just had a comment, I want to thank you for preparing this for us tonight, man I appreciate

00:18:49.400 --> 00:18:50.400
 that.

00:18:50.400 --> 00:18:57.640
 And it helps me too when we get the slides, the slide deck the next day, and I can study

00:18:57.640 --> 00:19:01.800
 it and go back into my resources, but good job on that.

00:19:01.800 --> 00:19:03.440
 You're welcome.

00:19:03.440 --> 00:19:13.160
 I'm curious the taking access or adjacent to a TxDOT right of way, is that a TxDOT requirement

00:19:13.160 --> 00:19:19.840
 that basically in order to do the access study on whether curb warrant or not and all that,

00:19:19.840 --> 00:19:24.400
 that they require it, or is that a city requirement given that we know questions are going to

00:19:24.400 --> 00:19:27.160
 come when TxDOT is involved?

00:19:27.160 --> 00:19:33.160
 Generally that's a result of TxDOT asking for a TIA, I don't believe everything that

00:19:33.160 --> 00:19:40.160
 takes access off of the roadways requires a TIA, but a lot do, and so we just give them

00:19:40.160 --> 00:19:44.240
 that flag that hey, TxDOT might need you.

00:19:44.240 --> 00:19:47.800
 The development community is not surprised when they come through an application and

00:19:47.800 --> 00:19:57.080
 hear that from TxDOT themselves, does that make sense?

00:19:57.080 --> 00:20:06.560
 I guess, and feel free to defer, but I know that some of our work on the TIA process a

00:20:06.560 --> 00:20:16.760
 couple of years ago instituted in addition to vehicle daily trips that there's a pedestrian

00:20:16.760 --> 00:20:23.440
 TIA as well in areas where we expect higher pedestrian volume, is that something that

00:20:23.440 --> 00:20:24.440
 is still ongoing?

00:20:24.440 --> 00:20:28.080
 I know we've had a lot of staff turnover in that department and that sort of thing.

00:20:28.080 --> 00:20:34.760
 That is a great question, I know our transportation team are definitely on a day to day basis

00:20:34.760 --> 00:20:40.480
 involved with the TIA and all that sort of stuff, so we can't answer your question for

00:20:40.480 --> 00:20:42.640
 sure, but we can look into it.

00:20:42.640 --> 00:20:50.400
 I will say that a lot of sidewalk improvements, a lot of those are handled through a requirement

00:20:50.400 --> 00:20:55.600
 for perimeter street improvements, so just by boarding a road they have to improve the

00:20:55.600 --> 00:21:00.520
 sidewalk if deemed necessary, so I know a lot of that is captured that way, I'm not

00:21:00.520 --> 00:21:04.560
 sure of anything beyond that, and so we can check.

00:21:04.560 --> 00:21:11.960
 I think specifically one thing I hear from the community is for historical reasons I

00:21:11.960 --> 00:21:18.560
 gather of ADA requirements and all these other things, we frequently see infrastructure put

00:21:18.560 --> 00:21:24.280
 in place where an ADA ramp will be installed because it was adjacent on a roadway, but

00:21:24.280 --> 00:21:31.520
 then it stops at the grass and the sidewalk continues, and I know that certainly we wouldn't

00:21:31.520 --> 00:21:40.520
 approve a new development to have access off of a roadway when the street between their

00:21:40.520 --> 00:21:46.160
 perimeter and the rest of the street network either doesn't exist or doesn't conform to

00:21:46.160 --> 00:21:49.960
 the standards sufficient to carry the expected traffic.

00:21:49.960 --> 00:21:58.600
 So I think the question I hear from the community just for future reference is are there examples

00:21:58.600 --> 00:22:07.800
 or triggers that we have that would lead toward more of a network improvement from a sidewalk

00:22:07.800 --> 00:22:13.880
 perspective in targeted areas where we do expect people to walk, not necessarily in

00:22:13.880 --> 00:22:24.080
 the triangle bordered by highways, but in areas where we do, are we taking advantage

00:22:24.080 --> 00:22:31.560
 of the activity that does go on to really take a hard look at that, so obviously understand

00:22:31.560 --> 00:22:36.920
 that it's more of a transportation question, but that would be interesting to understand

00:22:36.920 --> 00:22:39.920
 as that team gets reestablished.

00:22:39.920 --> 00:22:44.000
 We'll definitely ask them.

00:22:44.000 --> 00:22:47.600
 Any other questions?

00:22:47.600 --> 00:22:48.600
 Thank you so much, Matt.

00:22:48.600 --> 00:22:53.700
 You're welcome.

00:22:53.700 --> 00:23:00.300
 And I believe that is our last work session report.

00:23:00.300 --> 00:23:14.160
 So with that at 5.35 p.m., we will recess from our work session, and we will see everyone

00:23:14.160 --> 00:23:18.440
 at 6.30 p.m. in the council chambers for the regular session.

00:23:18.440 --> 00:23:26.160
 Thank you.

00:23:26.160 --> 00:23:33.900
 Good evening, with the quorum present at 6.30 p.m. on August 27, 2025, I will call this

00:23:33.900 --> 00:23:37.640
 meeting of the Denton Planning and Zoning Commission to order.

00:23:37.640 --> 00:23:45.480
 Our first order of business is to stand and pledge allegiance to the U.S. and Texas flags.

00:23:45.480 --> 00:23:56.520
 I pledge allegiance to the flag of the United States of America, and to the republic for

00:23:56.520 --> 00:24:03.040
 which it stands, one nation, under God, indivisible, with liberty and justice for all.

00:24:03.040 --> 00:24:19.840
 Honored the Texas flag, I pledge allegiance to the Texas, one state, under God, one, indivisible.

00:24:19.840 --> 00:24:26.560
 That brings us to Item 2A, PZ25-167, consider approval of the Planning and Zoning Commission

00:24:26.560 --> 00:24:27.560
 minutes.

00:24:27.560 --> 00:24:36.240
 Any discussion or motion, Commissioner MacDuff?

00:24:36.240 --> 00:24:42.200
 To approve the minutes of August 13, 2025, planning and zoning meeting minutes.

00:24:42.200 --> 00:24:43.840
 Thank you.

00:24:43.840 --> 00:24:44.840
 Commissioner Dyer?

00:24:44.840 --> 00:24:46.720
 I will second that motion.

00:24:46.720 --> 00:24:47.720
 Very good.

00:24:47.720 --> 00:24:55.920
 Seeing no discussion, I'll call for a vote on the board.

00:24:55.920 --> 00:24:57.960
 That item passes 4-0.

00:24:57.960 --> 00:25:03.520
 Brings us to our consent agenda.

00:25:03.520 --> 00:25:20.160
 Any open the floor for a motion or discussion?

00:25:20.160 --> 00:25:21.160
 Commissioner MacDuff?

00:25:21.160 --> 00:25:27.560
 Yes, I'd like to make a motion to approve this final plan as it meets the established

00:25:27.560 --> 00:25:30.400
 criteria for approval.

00:25:30.400 --> 00:25:33.200
 Except for the entire consent agenda?

00:25:33.200 --> 00:25:37.280
 I'd be glad to do that.

00:25:37.280 --> 00:25:38.760
 And Commissioner Garland?

00:25:38.760 --> 00:25:43.120
 I second to approve.

00:25:43.120 --> 00:25:51.080
 Seeing no discussion, I'll call for a vote on the board.

00:25:51.080 --> 00:25:54.120
 That item passes 4-0.

00:25:54.120 --> 00:25:57.120
 Brings us to items for individual consideration.

00:25:57.120 --> 00:26:05.800
 Item 4A, PZ25-168, elect a vice chair to the Planning and Zoning Commission.

00:26:05.800 --> 00:26:14.240
 I will say on this item, certainly welcome to entertain any nominations.

00:26:14.240 --> 00:26:19.800
 I did speak to Commissioner Riggs and he said that if you all would like him, he's willing

00:26:19.800 --> 00:26:21.280
 to serve.

00:26:21.280 --> 00:26:25.000
 The other thing I will point out is that I'm actually going to be out on business travel

00:26:25.000 --> 00:26:32.520
 the next two meetings in September, so whoever gets this lovely job will have some time to

00:26:32.520 --> 00:26:35.480
 practice in the next two meetings.

00:26:35.480 --> 00:26:36.480
 Any discussion?

00:26:36.480 --> 00:26:37.480
 Commissioner MacDuff?

00:26:37.480 --> 00:26:45.040
 Yes, I'd like to make a motion to nominate Commissioner Clay Riggs as vice chair, Planning

00:26:45.040 --> 00:26:47.360
 and Zoning Commission.

00:26:47.360 --> 00:26:52.360
 I'd like to speak to his credentials, and he's a long-time Denton citizen, as well as

00:26:52.360 --> 00:26:59.320
 a retired employee, a long-time director of Public Works, and so he is very familiar with

00:26:59.320 --> 00:27:04.520
 goings-on of planning and zoning, and I appreciate his assistance.

00:27:04.520 --> 00:27:05.640
 Sure.

00:27:05.640 --> 00:27:06.640
 Commissioner Dyer?

00:27:06.640 --> 00:27:10.000
 I will second that motion.

00:27:10.000 --> 00:27:11.080
 Okay.

00:27:11.080 --> 00:27:18.280
 Seeing no discussion, I'll call for a vote on the board.

00:27:18.280 --> 00:27:21.560
 Item passes 4-0.

00:27:21.560 --> 00:27:26.480
 Next item is 4B, FP 25-0018B.

00:27:26.480 --> 00:27:30.160
 Good evening.

00:27:30.160 --> 00:27:44.760
 Good evening, Chair and members of the Commission, Erin Stanley, Assistant Planner.

00:27:44.760 --> 00:27:47.840
 I'm presenting this for Mia Hines tonight.

00:27:47.840 --> 00:27:51.240
 This is FP 25-18.

00:27:51.240 --> 00:27:54.660
 This is a final plat for Hickory Grove Phase 4.

00:27:54.660 --> 00:28:01.160
 This is approximately 114 acres, generally located south of Jackson Road and east of

00:28:01.160 --> 00:28:05.000
 the intersection of Nail Road and Jackson Road.

00:28:05.000 --> 00:28:10.260
 This has been approved by this body back in June, and then as they were working to file

00:28:10.260 --> 00:28:16.280
 the plat, they noticed a few other things that they needed to add, one HOA lot and add

00:28:16.280 --> 00:28:20.460
 an easement to the plat, so that is back before you tonight.

00:28:20.460 --> 00:28:24.720
 At this time, it does not meet our criteria for approval, and staff is recommending denial,

00:28:24.720 --> 00:28:33.720
 but we have no objection to the first extension to September, I think that should be 24th,

00:28:33.720 --> 00:28:35.800
 2025.

00:28:35.800 --> 00:28:43.440
 And the request for extension, I think, was emailed to all of us earlier.

00:28:43.440 --> 00:28:45.920
 Commissioner Dyer?

00:28:45.920 --> 00:28:53.960
 I would like to make a motion that we go ahead and approve the extension of this particular

00:28:53.960 --> 00:28:57.680
 plat until the 24th of September.

00:28:57.680 --> 00:28:58.760
 Thank you.

00:28:58.760 --> 00:28:59.760
 Commissioner MacDuff?

00:28:59.760 --> 00:29:06.960
 Yes, I'd like to second Commissioner Dyer's motion to approve this extension, would be

00:29:06.960 --> 00:29:12.240
 the first extension to date certain of September 24th, 2025.

00:29:12.240 --> 00:29:13.800
 Thank you.

00:29:13.800 --> 00:29:22.040
 Seeing no discussion, I'll call for a vote on the board on the motion to continue.

00:29:22.040 --> 00:29:28.360
 That item passes 4-0, brings us to item 4C, PP 25-0003.

00:29:28.360 --> 00:29:35.280
 Good evening again, Erin Stanley, assistant planner.

00:29:35.280 --> 00:29:43.600
 This is FP, or not FP, preliminary plat, PP 25-0003.

00:29:43.600 --> 00:29:49.680
 This is a preliminary plat for CORE 5 LC Razor Ranch Edition.

00:29:49.680 --> 00:29:57.120
 This is located south of US 380, approximately 900 feet west of I-35, and 600 feet north

00:29:57.120 --> 00:29:59.200
 of Jim Crystal Road.

00:29:59.200 --> 00:30:03.540
 At this time, this plat does not meet our criteria for approval, but we have no objection

00:30:03.540 --> 00:30:06.400
 to the requested first extension to September 24th.

00:30:06.400 --> 00:30:08.480
 I'll stand for any questions.

00:30:08.480 --> 00:30:09.880
 Thank you.

00:30:09.880 --> 00:30:13.520
 Any questions or a motion?

00:30:13.520 --> 00:30:16.280
 Commissioner MacDuff?

00:30:16.280 --> 00:30:26.000
 Yes, I'd like to make a motion for approval of this first extension request to date certain

00:30:26.000 --> 00:30:30.400
 of September 24th, 2025.

00:30:30.400 --> 00:30:31.400
 Thank you.

00:30:31.400 --> 00:30:34.240
 And Commissioner Garland?

00:30:34.240 --> 00:30:35.880
 And I'll second the motion.

00:30:35.880 --> 00:30:37.920
 Thank you.

00:30:37.920 --> 00:30:42.240
 With the motion and a second, and seeing no discussion, I'll call for a vote on the board

00:30:42.240 --> 00:30:56.120
 that item passes 4-0, brings us to our one public hearing today, item 5A-Z25-0008.

00:30:56.120 --> 00:31:00.920
 Good evening.

00:31:00.920 --> 00:31:13.080
 All right, good evening, I'm Julie Wyatt, principal planner with the City of Denton,

00:31:13.080 --> 00:31:17.400
 and I am presenting Z258 Cat 35.

00:31:17.400 --> 00:31:25.360
 The request before you is a rezoning of 68 acres from PD 142 Hillcrest Center to a planned

00:31:25.360 --> 00:31:26.680
 development general office.

00:31:26.680 --> 00:31:31.360
 It is a PD overlay, is what we're looking at tonight.

00:31:31.360 --> 00:31:37.320
 The purpose is to facilitate an employment use development, things like warehouse, light

00:31:37.320 --> 00:31:44.240
 industrial, and office uses, but if it was approved, any use that is allowed in the district

00:31:44.240 --> 00:31:46.160
 could be developed.

00:31:46.160 --> 00:31:50.800
 The site is located on the north side of town at the northern gateway of Denton, we talked

00:31:50.800 --> 00:31:55.360
 about that in the work session, and it's at the confluence of three major highways.

00:31:55.360 --> 00:32:01.800
 You've got Highway 77 on the north, 35 on the west side, and then loop 288 along the

00:32:01.800 --> 00:32:04.960
 south side.

00:32:04.960 --> 00:32:07.900
 So as I mentioned, the current zoning is PD 142.

00:32:07.900 --> 00:32:10.520
 This PD is one of our older PDs.

00:32:10.520 --> 00:32:12.920
 We don't have many of them left, but this is one of them.

00:32:12.920 --> 00:32:19.600
 It was established in 1991 as an urban center intended to create a concentration of employment

00:32:19.600 --> 00:32:25.960
 type uses in commercial development, kind of as a hub right here next to all of these

00:32:25.960 --> 00:32:26.960
 highways.

00:32:26.960 --> 00:32:32.720
 The PD had permitted uses, and just on your screen you'll see offices, light industrial,

00:32:32.720 --> 00:32:34.000
 and warehouse were permitted.

00:32:34.000 --> 00:32:38.960
 So if the property developed under its current PD, the uses that they are proposing would

00:32:38.960 --> 00:32:40.960
 be allowed.

00:32:40.960 --> 00:32:45.440
 The development standards, however, were kind of 1991 standards, so they are proposing to

00:32:45.440 --> 00:32:54.080
 rezone to something a little more current, a little more modern, and apply current standards.

00:32:54.080 --> 00:32:58.080
 The map on your screen is the development plan for the Hillcrest Center.

00:32:58.080 --> 00:33:01.280
 You can see the only thing that really is developed out of this PD is the Stonehill

00:33:01.280 --> 00:33:05.420
 Center, which we're all familiar with.

00:33:05.420 --> 00:33:08.080
 So we'll go briefly over their proposal.

00:33:08.080 --> 00:33:11.800
 As I mentioned, this is an overlay PD, and what that means is there isn't a site plan

00:33:11.800 --> 00:33:13.040
 associated with it.

00:33:13.040 --> 00:33:17.360
 There's just some parameters in text for the PD.

00:33:17.360 --> 00:33:20.880
 As the base zoning, they are proposing general office.

00:33:20.880 --> 00:33:26.000
 There are five elements that the PD includes where they modify some of the standards in

00:33:26.000 --> 00:33:27.360
 the debt and development code.

00:33:27.360 --> 00:33:32.640
 First of all, that screening at the right of way, the 30 to 35 foot screening at the

00:33:32.640 --> 00:33:40.120
 right of way, 30 feet along loop 288 and highway 77 and then 35 feet along I-35.

00:33:40.120 --> 00:33:44.400
 This will allow that buffer to have them put all of those landscaping elements that we

00:33:44.400 --> 00:33:52.060
 want to see on developments, in developments, sufficient room to put that in.

00:33:52.060 --> 00:33:55.440
 They are also proposing a deviation of parking.

00:33:55.440 --> 00:33:59.920
 Because they don't have an end user and they want flexibility as this project or as this

00:33:59.920 --> 00:34:10.100
 site evolves over the years, so they are proposing a minimum maximum of 2,000 square feet or

00:34:10.100 --> 00:34:13.800
 500 square feet to 2,000 square feet maximum.

00:34:13.800 --> 00:34:19.280
 Also allowing the director to make determination on parking standards if there's some nuances

00:34:19.280 --> 00:34:20.720
 associated with it.

00:34:20.720 --> 00:34:23.980
 That just gives them some flexibility as they move forward.

00:34:23.980 --> 00:34:30.400
 They're proposing to enhance our building design standards with that 30% windows along

00:34:30.400 --> 00:34:37.960
 that entrance to the development as well as modifying our minimum breaks from 50 feet

00:34:37.960 --> 00:34:44.800
 to 100 feet, given the skies and scale of the building to increase that interval size.

00:34:44.800 --> 00:34:49.880
 They are proposing that dock doors cannot face directly face any right of way.

00:34:49.880 --> 00:34:52.560
 It would also be prohibited in front yards.

00:34:52.560 --> 00:34:57.080
 And they have to be screened by walls, building projections, wing walls, retaining walls,

00:34:57.080 --> 00:35:00.520
 something other so that you can't see it from the right of way.

00:35:00.520 --> 00:35:03.600
 And then a limitation on outdoor storage.

00:35:03.600 --> 00:35:08.400
 Walls other than trailer parking would be limited to 30% of truck court areas and those

00:35:08.400 --> 00:35:12.280
 are those areas behind the building screened.

00:35:12.280 --> 00:35:16.160
 Just to make sure that once again any visual impacts associated with outdoor storage would

00:35:16.160 --> 00:35:22.840
 be either limited, minimized, or hopefully negated completely.

00:35:22.840 --> 00:35:27.680
 Criteria for approval for any rezoning is in the development code, subchapter 2.

00:35:27.680 --> 00:35:29.240
 I won't go over all of them.

00:35:29.240 --> 00:35:31.560
 We'll just talk about some highlights.

00:35:31.560 --> 00:35:35.640
 Basically in summary, it is consistent with the comprehensive plan both in future land

00:35:35.640 --> 00:35:38.640
 use and in our goals and policies.

00:35:38.640 --> 00:35:43.400
 The development, if approved, any development would have to comply with Denton Development

00:35:43.400 --> 00:35:48.840
 Code requirements except for where they have deviated in the PD.

00:35:48.840 --> 00:35:52.600
 Staff's analysis is that the development is appropriate for the area and location and

00:35:52.600 --> 00:35:56.440
 planning given all the highway to access.

00:35:56.440 --> 00:36:00.760
 And it's not expected to generate adverse impacts to compatibility infrastructure or

00:36:00.760 --> 00:36:02.800
 fiscal impacts.

00:36:02.800 --> 00:36:05.560
 We'll talk about a couple things just a little more in depth.

00:36:05.560 --> 00:36:09.640
 First of all, the comprehensive plan, the future land use business center, that's envisioned

00:36:09.640 --> 00:36:15.440
 to be our employment centers, things like offices, maybe some light industrial, a range

00:36:15.440 --> 00:36:17.600
 of businesses and sizes.

00:36:17.600 --> 00:36:20.600
 The proposed GEO district is consistent.

00:36:20.600 --> 00:36:24.840
 In fact, GEO is one of those districts that we typically find within business center that

00:36:24.840 --> 00:36:29.400
 we like to see.

00:36:29.400 --> 00:36:35.520
 But the overlay also provides additional enhancements given the site's location at the gateway.

00:36:35.520 --> 00:36:40.800
 And those are those enhancements we talked about, the screening, the landscaping, making

00:36:40.800 --> 00:36:45.040
 sure that it's a higher quality development here at the gateway of Denton.

00:36:45.040 --> 00:36:50.860
 And that helps us achieve goal CC4 which achieves exemplary urban design.

00:36:50.860 --> 00:36:58.360
 Site location makes sense and the site design standards also screen those loading docks

00:36:58.360 --> 00:37:02.240
 and the things that we don't want to see from the right away.

00:37:02.240 --> 00:37:05.800
 The proposal also provides a greater level of design.

00:37:05.800 --> 00:37:07.520
 Once again, it enhances that landscaping.

00:37:07.520 --> 00:37:13.280
 It reduces the visual impacts of the dock doors, provides the flexibility in parking,

00:37:13.280 --> 00:37:19.800
 it increases those architectural standards for really requiring additional architecture

00:37:19.800 --> 00:37:26.280
 there at the entrance of any building, and it also limits the amount of permitted locations

00:37:26.280 --> 00:37:29.640
 of accessory outdoor storage.

00:37:29.640 --> 00:37:31.960
 Notification was sent out.

00:37:31.960 --> 00:37:35.800
 We received one letter in favor.

00:37:35.800 --> 00:37:42.840
 It was this property just to the northeast of the subject site.

00:37:42.840 --> 00:37:46.040
 So based upon the criteria for approval, staff recommends approval.

00:37:46.040 --> 00:37:50.200
 I'll be happy to answer any questions, and the applicant is here with a brief presentation

00:37:50.200 --> 00:37:54.880
 and to also answer your questions.

00:37:54.880 --> 00:38:05.320
 >> Any questions for staff at this time?

00:38:05.320 --> 00:38:06.320
 Commissioner McDuff?

00:38:06.320 --> 00:38:08.400
 >> Yes, Ms. White.

00:38:08.400 --> 00:38:12.040
 Would you elaborate some more on the gateway concept?

00:38:12.040 --> 00:38:13.040
 >> Sure.

00:38:13.040 --> 00:38:21.240
 So the comprehensive plan designates this area as a gateway.

00:38:21.240 --> 00:38:25.440
 As you drive south on 35, this is one of the first parts of Denton that you see, and we

00:38:25.440 --> 00:38:31.000
 want to make sure that the urban design meets an elevated standard in this area.

00:38:31.000 --> 00:38:36.000
 So not only in terms of public infrastructure in our highways and our roadways, but also

00:38:36.000 --> 00:38:37.240
 our developments.

00:38:37.240 --> 00:38:41.240
 And that was the impetus for the PD overlay.

00:38:41.240 --> 00:38:48.260
 And so we coordinated with the applicant, kind of worked back and forth to find those

00:38:48.260 --> 00:38:53.200
 overlay conditions that kind of work for their project, but also where that higher quality

00:38:53.200 --> 00:38:56.000
 design that the City of Denton wants to see on the gateway.

00:38:56.000 --> 00:39:03.880
 So that really is the gateway location is the reason for the overlay.

00:39:03.880 --> 00:39:04.880
 >> Commissioner Dyer?

00:39:04.880 --> 00:39:11.360
 >> I know you answered this in the workshop, but just for those citizens who are only viewing

00:39:11.360 --> 00:39:18.700
 this meeting, could you just kind of explain when you look at the 288 expansion that's

00:39:18.700 --> 00:39:27.640
 about to happen on the west side of 35, is there going to be any sort of updating to

00:39:27.640 --> 00:39:35.480
 that 288 loop just on this east side of 35 that the owner might have to think about when

00:39:35.480 --> 00:39:41.480
 putting in the development here and the buildings and the landscaping and all that stuff?

00:39:41.480 --> 00:39:42.480
 >> That is a great question.

00:39:42.480 --> 00:39:48.520
 So this part of town is going to look a whole lot different in about 10 years.

00:39:48.520 --> 00:39:49.800
 TxDOT has plans.

00:39:49.800 --> 00:39:51.600
 You are exactly correct.

00:39:51.600 --> 00:40:01.600
 Loop 288 will get frontage roads all along the northern arc of Loop 288.

00:40:01.600 --> 00:40:08.440
 Also a direct connector will connect the main lanes of Loop 288 to 35, both going north

00:40:08.440 --> 00:40:10.440
 and south and east and west.

00:40:10.440 --> 00:40:15.400
 So it's going to look a lot different.

00:40:15.400 --> 00:40:21.400
 Our transportation folks, this project is not underway yet.

00:40:21.400 --> 00:40:25.980
 There's a concept out there, but it's not finalized.

00:40:25.980 --> 00:40:31.640
 So we don't anticipate that anything at the very earliest would start would be 2030, but

00:40:31.640 --> 00:40:35.120
 I wouldn't even promise that.

00:40:35.120 --> 00:40:41.480
 Part of that additional landscape buffer, TxDOT has acquired right-of-way, but if the

00:40:41.480 --> 00:40:46.740
 design changes and TxDOT needs additional right-of-way, that landscape buffer will provide

00:40:46.740 --> 00:40:51.360
 that additional room to give some flexibility and some breathing room to allow the landscaping,

00:40:51.360 --> 00:40:56.840
 the screening, the kinds of things that we want to see at the right-of-way, room to stay

00:40:56.840 --> 00:41:00.700
 and not be taken out by any right-of-way.

00:41:00.700 --> 00:41:01.960
 So we don't have a crystal ball.

00:41:01.960 --> 00:41:06.920
 We don't know what is going to happen, but that 30- and 35-foot landscape buffer will

00:41:06.920 --> 00:41:10.360
 give some breathing room, yes, ma'am.

00:41:10.360 --> 00:41:16.580
 So as a follow-on to that, then, what would happen if TxDOT did take more right-of-way

00:41:16.580 --> 00:41:21.840
 than everybody is thinking they're going to and that ate into some of the landscaping?

00:41:21.840 --> 00:41:26.240
 With the overlay on here, does the city have a right to go back to the property owner to

00:41:26.240 --> 00:41:31.840
 say, "Hey, you need to add some more landscaping here to make it pretty for the gateway"?

00:41:31.840 --> 00:41:37.120
 The Denton Development Code speaks to that, and we typically do not require developers

00:41:37.120 --> 00:41:44.840
 to put back the landscaping or the things that were put in place as required by the

00:41:44.840 --> 00:41:46.200
 Denton Development Code.

00:41:46.200 --> 00:41:52.080
 Now, often, property owners, if TxDOT comes in and acquires right-of-way, have to reconfigure

00:41:52.080 --> 00:41:56.960
 their sites, their parking, maybe they'll lose parking, they lose that frontage.

00:41:56.960 --> 00:42:02.240
 At that time, if they reconfigure, we coordinate with them to get it as close to the requirements

00:42:02.240 --> 00:42:03.240
 as possible.

00:42:03.240 --> 00:42:04.240
 Okay.

00:42:04.240 --> 00:42:11.340
 I don't see any other questions yet.

00:42:11.340 --> 00:42:13.640
 Thank you.

00:42:13.640 --> 00:42:14.640
 This is a public hearing.

00:42:14.640 --> 00:42:17.520
 I will open the public hearing at this time.

00:42:17.520 --> 00:42:24.000
 I don't have a card, so you'll have to fill out one.

00:42:24.000 --> 00:42:25.960
 That's certainly fine.

00:42:25.960 --> 00:42:27.320
 We can get you a card here.

00:42:27.320 --> 00:42:32.760
 But if you want to come forward and share anything about this application, you're certainly

00:42:32.760 --> 00:42:38.320
 welcome to just name and address, and the secretary can get you a card afterwards.

00:42:38.320 --> 00:42:39.720
 There we go.

00:42:39.720 --> 00:42:41.040
 Yeah, good evening.

00:42:41.040 --> 00:42:46.200
 Miles Terry, 5710 Ben Oak Place in Dallas, Texas.

00:42:46.200 --> 00:42:48.600
 Thank you, commissioners and chair, for the opportunity to speak tonight.

00:42:48.600 --> 00:42:52.480
 I'll keep it brief, because Julie did a wonderful job summarizing what we're planning here.

00:42:52.480 --> 00:42:57.360
 I'll just quickly tell you about ourselves as a developer, maybe touch on the site plan

00:42:57.360 --> 00:42:59.360
 that we have so you guys can see that.

00:42:59.360 --> 00:43:04.360
 As you can see on the screen, this is a proposed building design for the building on I-35,

00:43:04.360 --> 00:43:09.200
 so enhanced building design, we'll talk about that, and then we always engage a third-party

00:43:09.200 --> 00:43:15.400
 economic consultant to determine tax revenue that the city should expect and jobs that

00:43:15.400 --> 00:43:16.400
 you should expect.

00:43:16.400 --> 00:43:18.960
 So I'll just touch on those three things.

00:43:18.960 --> 00:43:23.360
 So just by way of background, I'm with Jackson Shaw, I run our North Texas Division.

00:43:23.360 --> 00:43:25.600
 We have three lines of business.

00:43:25.600 --> 00:43:31.760
 We've been around for 53 years based in Dallas, your hospitality development, residential

00:43:31.760 --> 00:43:34.140
 lot development, and then also we do business parks.

00:43:34.140 --> 00:43:38.760
 So what you see here, and that entails we'll go find anywhere from 10 to 300 acres, and

00:43:38.760 --> 00:43:44.640
 we may do one to 15 buildings, and we try to create a business park in its employment

00:43:44.640 --> 00:43:48.160
 zone and draw the type of tenants that the city will be proud of.

00:43:48.160 --> 00:43:52.180
 I'll show you some example projects through this as well.

00:43:52.180 --> 00:43:55.800
 As I said, we've been around for 53 years.

00:43:55.800 --> 00:44:02.920
 Our owners here, Louis Shaw, he's always instilled a sense of just elevated design in everything

00:44:02.920 --> 00:44:04.080
 that we do.

00:44:04.080 --> 00:44:08.120
 You can see some example projects of business parks that we do here.

00:44:08.120 --> 00:44:12.080
 There's always going to be more glass, we're going to be more sensitive to many of the

00:44:12.080 --> 00:44:16.000
 things that Julie touched on, just where dock doors are, the type and size of buildings

00:44:16.000 --> 00:44:17.000
 that you do.

00:44:17.000 --> 00:44:20.320
 We want to bring in the right tenants to any place we're going to do business.

00:44:20.320 --> 00:44:22.160
 This is a two-phase project.

00:44:22.160 --> 00:44:27.000
 We plan on being, you know, developing and leasing and owning here for a minimum of six

00:44:27.000 --> 00:44:28.000
 or seven years.

00:44:28.000 --> 00:44:29.000
 So that's a long time.

00:44:29.000 --> 00:44:30.280
 We need to make sure we do it the right way.

00:44:30.280 --> 00:44:35.600
 And then we've been in Dallas for 53 years already, and so the opportunity to do it again

00:44:35.600 --> 00:44:39.520
 when we come talk to other municipalities, we know that you can go drive those projects.

00:44:39.520 --> 00:44:42.480
 So we want to make sure it's a project that everybody's proud of.

00:44:42.480 --> 00:44:46.080
 So example projects here, you're going to typically notice from the type of business

00:44:46.080 --> 00:44:51.640
 parks that we do, you're going to see elevated entries with more glass, more articulation.

00:44:51.640 --> 00:44:55.160
 This is a stained concrete that was pretty unique, and here's a few different projects,

00:44:55.160 --> 00:44:57.780
 and I'll show you some of the additionals as well.

00:44:57.780 --> 00:45:01.200
 We also always try to really engage with the community.

00:45:01.200 --> 00:45:04.880
 Specific to a South Fort Worth project we did, this was just one example.

00:45:04.880 --> 00:45:10.000
 This was done, it's called 46 Ranch, it's in South Fort Worth.

00:45:10.000 --> 00:45:15.080
 As a result of that project and where we were, we've been engaged in, I guess that's seven

00:45:15.080 --> 00:45:20.160
 or eight different philanthropic, different activities, and continue to do even though

00:45:20.160 --> 00:45:22.800
 we've built that project four or five years ago.

00:45:22.800 --> 00:45:26.720
 So that's something I think that you'll see from us as we get more involved in Denton

00:45:26.720 --> 00:45:28.800
 and engaged in this community.

00:45:28.800 --> 00:45:30.240
 We'll do more than just build a project.

00:45:30.240 --> 00:45:33.960
 So we'll find various causes that are important to the community, important to members like

00:45:33.960 --> 00:45:39.120
 yourself, and find a way to contribute time and/or dollars during the project, so just

00:45:39.120 --> 00:45:41.480
 a few examples here.

00:45:41.480 --> 00:45:45.560
 Our team, as I talked about us, we've got Kimley Horne, so I think you guys know Mack,

00:45:45.560 --> 00:45:46.960
 he's the engineer on the project.

00:45:46.960 --> 00:45:49.340
 Kimley Horne's also the landscape architect.

00:45:49.340 --> 00:45:54.280
 We have an architect out of California that they wrote the book for NAOP, if you guys

00:45:54.280 --> 00:45:59.160
 are familiar with NAOP, on kind of business, park, industrial, real estate, do some really

00:45:59.160 --> 00:46:08.280
 cool projects, and then we hired Pettit Economic Development for the jobs and tax revenue study.

00:46:08.280 --> 00:46:09.280
 You've seen the site.

00:46:09.280 --> 00:46:12.120
 We obviously talked about the zoning, so I'll breeze through this.

00:46:12.120 --> 00:46:13.120
 I think this was important.

00:46:13.120 --> 00:46:19.560
 I noticed this in the presentation on the 5th from Stephen, they actually had this area.

00:46:19.560 --> 00:46:22.480
 In his presentation, it was actually designated as industrial in the future.

00:46:22.480 --> 00:46:26.040
 I know it's the business innovation, but this is how it was listed there.

00:46:26.040 --> 00:46:30.600
 It was just something we thought was interesting, and we included it here.

00:46:30.600 --> 00:46:32.000
 Julie touched on this great.

00:46:32.000 --> 00:46:35.240
 We've been really thoughtful about our site plan, and the way we've designed this is all

00:46:35.240 --> 00:46:39.960
 our truck courts are all screened by buildings, kind of corner pods on each building.

00:46:39.960 --> 00:46:40.960
 We've got screen walls as well.

00:46:40.960 --> 00:46:44.000
 You're going to see enhanced design, as you see from this picture.

00:46:44.000 --> 00:46:49.400
 This isn't final, but this is one of the elevation designs that we're contemplating.

00:46:49.400 --> 00:46:51.720
 Our owner here has been very thoughtful.

00:46:51.720 --> 00:46:52.720
 They know Jackson Shaw.

00:46:52.720 --> 00:46:56.680
 They know our reputation as a really quality developer, and so that's one of the reasons

00:46:56.680 --> 00:46:59.360
 we got the opportunity to be in front of you today.

00:46:59.360 --> 00:47:00.680
 Enhanced landscaping, she talked about.

00:47:00.680 --> 00:47:01.680
 We've got buffering.

00:47:01.680 --> 00:47:07.680
 We've got a product type that typically lends itself to higher office, more jobs and tenants,

00:47:07.680 --> 00:47:11.720
 employees within there, and then generally less truck traffic.

00:47:11.720 --> 00:47:15.320
 You've seen some of the bigger buildings that might be 500 to a million square feet throughout

00:47:15.320 --> 00:47:17.300
 town with a lot of dock doors.

00:47:17.300 --> 00:47:18.480
 This isn't that type of product.

00:47:18.480 --> 00:47:21.880
 Our largest building's 260,000 square feet.

00:47:21.880 --> 00:47:26.600
 Our 30,000 to 100,000 square feet tenants is what we're targeting.

00:47:26.600 --> 00:47:27.600
 Bypass.

00:47:27.600 --> 00:47:29.000
 Here's a site plan example.

00:47:29.000 --> 00:47:33.880
 So 35 is on plan left, 288 on the south.

00:47:33.880 --> 00:47:35.820
 There's three buildings in phase one.

00:47:35.820 --> 00:47:38.840
 It's roughly 540,000 square feet.

00:47:38.840 --> 00:47:43.360
 Phase two is three buildings as well, roughly 368,000 square feet.

00:47:43.360 --> 00:47:47.040
 As you can see here, we've got ... I mean, all your docks and your truck courts are internal

00:47:47.040 --> 00:47:50.280
 to the site, same here, same here, and same here.

00:47:50.280 --> 00:47:54.800
 So what you're going to see is back to an elevation like this.

00:47:54.800 --> 00:47:59.960
 You're going to see something from, as you're going by on 35 or 288 or 77, it's going to

00:47:59.960 --> 00:48:05.640
 look and feel a lot like an office complex, an office building, but it has the modern

00:48:05.640 --> 00:48:11.440
 functionality of dock doors and ramps in the back of the building.

00:48:11.440 --> 00:48:14.200
 Continue to breeze through some of this stuff.

00:48:14.200 --> 00:48:15.280
 So the economic impact.

00:48:15.280 --> 00:48:16.760
 We always think this is important.

00:48:16.760 --> 00:48:20.640
 This is a site that's in ag today.

00:48:20.640 --> 00:48:23.360
 Property values at $1,100, as you can see there.

00:48:23.360 --> 00:48:28.240
 I think it produces like seven or eight dollars to the city right now in city taxes.

00:48:28.240 --> 00:48:33.000
 And so without development, that would be the continued future is some sort of ag exemption.

00:48:33.000 --> 00:48:35.440
 They have cattle on it from time to time.

00:48:35.440 --> 00:48:39.000
 So David Pettit did an analysis.

00:48:39.000 --> 00:48:42.000
 We plan to deliver the first phase in 27.

00:48:42.000 --> 00:48:44.760
 The second phase would deliver in 2029.

00:48:44.760 --> 00:48:50.080
 So the first year after a full build out, you're looking at based on comparables around Denton,

00:48:50.080 --> 00:48:53.040
 roughly a hundred million dollars in appraised value.

00:48:53.040 --> 00:48:59.660
 So you'll see on this next slide over a 25 year period, they estimated 39 million dollars

00:48:59.660 --> 00:49:05.200
 of tax revenue for the city and an overall 128 million if you factor in the county in

00:49:05.200 --> 00:49:06.200
 the school.

00:49:06.200 --> 00:49:08.720
 So significant tax revenue to the city.

00:49:08.720 --> 00:49:09.720
 I know that's important.

00:49:09.720 --> 00:49:13.240
 I've sat through a few of these now and seen some of the budget considerations and things

00:49:13.240 --> 00:49:14.240
 that are ongoing.

00:49:14.240 --> 00:49:16.000
 So I think this would make a big impact.

00:49:16.000 --> 00:49:21.120
 It also generates almost two million dollars in fees between the impact fees, permit fees,

00:49:21.120 --> 00:49:22.120
 review fees.

00:49:22.120 --> 00:49:27.800
 So it is substantial dollars being invested back into the city.

00:49:27.800 --> 00:49:33.260
 Specific to jobs, let's jump there.

00:49:33.260 --> 00:49:39.920
 We estimate 616 jobs would be created from this project as based on typical assumptions

00:49:39.920 --> 00:49:45.960
 of labor data that they see, type of tenants that we expect with an average wage of about

00:49:45.960 --> 00:49:47.360
 $63,000 a year.

00:49:47.360 --> 00:49:49.520
 So you'll see that flex up and down.

00:49:49.520 --> 00:49:53.560
 Our project, we completed a project in Benbrook.

00:49:53.560 --> 00:49:54.560
 Kind of fast forward.

00:49:54.560 --> 00:49:57.140
 Here's some tenants that you, you know, happy to share this.

00:49:57.140 --> 00:50:02.200
 This is tenants that we have on our projects across the country, many of these in Texas.

00:50:02.200 --> 00:50:03.780
 And here's some quick example projects.

00:50:03.780 --> 00:50:06.680
 This is one we did in Richardson.

00:50:06.680 --> 00:50:07.680
 This was also a zoning case.

00:50:07.680 --> 00:50:11.720
 It had a residential adjacency and so there was, you know, it was contentious at times,

00:50:11.720 --> 00:50:12.720
 right?

00:50:12.720 --> 00:50:15.520
 It was approved from the city, excuse me.

00:50:15.520 --> 00:50:18.800
 And then ultimately it won commercial real estate project of the year, a couple of years

00:50:18.800 --> 00:50:20.960
 after we had built it from the city.

00:50:20.960 --> 00:50:24.720
 It was a great example to a lot of tech tenants that came into the area.

00:50:24.720 --> 00:50:26.720
 You can see some of the design there.

00:50:26.720 --> 00:50:29.800
 This is one we completed about a year ago in Benbrook, which is just southwest Fort

00:50:29.800 --> 00:50:30.800
 Worth.

00:50:30.800 --> 00:50:34.640
 You saw these designs on the second page, but we've had two different headquarters moving

00:50:34.640 --> 00:50:35.720
 to this project already.

00:50:35.720 --> 00:50:38.800
 One on this Tandy Leather, if you guys are familiar with that organization out of Fort

00:50:38.800 --> 00:50:40.720
 Worth, it's been around for about a hundred years.

00:50:40.720 --> 00:50:45.000
 So you're seeing a lot of these different companies that are bringing their headquarters

00:50:45.000 --> 00:50:49.780
 with all their executive employees, HR functions, also with their distribution staff, so synergies

00:50:49.780 --> 00:50:51.320
 under the same building.

00:50:51.320 --> 00:50:53.280
 We think you can see a lot of the same thing with this project.

00:50:53.280 --> 00:50:56.960
 The front, you know, the front edge of the visibility, so you've got great branding opportunities.

00:50:56.960 --> 00:51:02.400
 It's going to look and feel like a business park, office park versus a distribution center.

00:51:02.400 --> 00:51:04.420
 This is one we just completed in Lakeview.

00:51:04.420 --> 00:51:06.920
 Also another zoning case.

00:51:06.920 --> 00:51:09.720
 This whole project, when it's done, will be almost two million square feet.

00:51:09.720 --> 00:51:14.720
 You know, this is your phase one that we just delivered within the last kind of 60 days.

00:51:14.720 --> 00:51:19.280
 We also built a build-to-suit, which isn't on here for a group called SAF Holland.

00:51:19.280 --> 00:51:24.880
 They're an automotive manufacturer, roughly 250 jobs, 260,000 square foot build-to-suit,

00:51:24.880 --> 00:51:28.540
 and so they're going to be doing automotive manufacturing at that facility.

00:51:28.540 --> 00:51:32.240
 I think the average pays $101,000, so a really good quality job.

00:51:32.240 --> 00:51:35.940
 You're seeing a lot of manufacturing move to Texas right now, and we think this project's

00:51:35.940 --> 00:51:37.920
 going to benefit from that.

00:51:37.920 --> 00:51:42.200
 Outside of that, I think I've taken enough time.

00:51:42.200 --> 00:51:44.260
 So this is just some of the stuff we pulled from your EDC.

00:51:44.260 --> 00:51:47.120
 We think it fits with what the city's trying to bring to the community.

00:51:47.120 --> 00:51:52.120
 Obviously, Julie touched on kind of the future land use and what's going on there, so I'll

00:51:52.120 --> 00:51:53.120
 answer any questions.

00:51:53.120 --> 00:51:54.120
 Thank you for the time.

00:51:54.120 --> 00:51:55.120
 >> Thank you.

00:51:55.120 --> 00:51:56.120
 >> Of course.

00:51:56.120 --> 00:52:00.320
 >> Any questions for the applicant this time?

00:52:00.320 --> 00:52:04.000
 >> Commissioner MacDuff?

00:52:04.000 --> 00:52:05.480
 >> Not a question, but a comment.

00:52:05.480 --> 00:52:10.280
 What strikes me is that it would be a wonderful location for an entry-level sign for public

00:52:10.280 --> 00:52:12.480
 image for Denton, Texas.

00:52:12.480 --> 00:52:19.720
 You all talk about being community contributors, and that's impressive, I think.

00:52:19.720 --> 00:52:25.000
 >> Thank you, thank you.

00:52:25.000 --> 00:52:26.000
 >> Commissioner Dyer?

00:52:26.000 --> 00:52:27.000
 >> I like the fountain.

00:52:27.000 --> 00:52:29.800
 That would be a nice gateway touch.

00:52:29.800 --> 00:52:33.320
 >> Is there room to put -- like you did in Benbrook?

00:52:33.320 --> 00:52:35.360
 Not that you have to.

00:52:35.360 --> 00:52:36.360
 >> Maybe.

00:52:36.360 --> 00:52:39.640
 >> That was a nice little touch right there in that corner.

00:52:39.640 --> 00:52:40.640
 >> The fountain looks awesome.

00:52:40.640 --> 00:52:43.360
 >> I know it takes up a lot of space.

00:52:43.360 --> 00:52:48.280
 >> It takes up space, and we've learned a lot about putting in fountains and wet ponds.

00:52:48.280 --> 00:52:50.840
 >> Hopefully for the better.

00:52:50.840 --> 00:52:54.160
 >> It's been a giant headache.

00:52:54.160 --> 00:52:55.800
 That's the first wet pond we've ever done.

00:52:55.800 --> 00:52:59.280
 It's at the front of the city, it's on I-20 as well.

00:52:59.280 --> 00:53:01.920
 It's right at the front entrance of the park, too.

00:53:01.920 --> 00:53:05.520
 We've considered it here, but we've learned some lessons on that one in Benbrook.

00:53:05.520 --> 00:53:08.240
 I wouldn't want to promise it and not do it.

00:53:08.240 --> 00:53:09.240
 >> But don't rule it out.

00:53:09.240 --> 00:53:10.240
 >> Okay.

00:53:10.240 --> 00:53:11.240
 Sounds good.

00:53:11.240 --> 00:53:12.240
 It's a good question.

00:53:12.240 --> 00:53:15.240
 I do like the way it looks.

00:53:15.240 --> 00:53:16.240
 >> Okay.

00:53:16.240 --> 00:53:17.240
 I don't see any other questions.

00:53:17.240 --> 00:53:18.240
 Thank you.

00:53:18.240 --> 00:53:19.240
 >> Okay.

00:53:19.240 --> 00:53:20.240
 Thank you.

00:53:20.240 --> 00:53:21.240
 >> This is a public hearing.

00:53:21.240 --> 00:53:27.140
 If anyone else would like to speak, you're more than welcome to.

00:53:27.140 --> 00:53:33.080
 Not seeing any sudden motion, I will close the public hearing.

00:53:33.080 --> 00:53:35.460
 Commissioner Dio.

00:53:35.460 --> 00:53:43.360
 >> I would like to make a motion that we move forward and approve the rezoning to plan development

00:53:43.360 --> 00:53:46.400
 general office for this location.

00:53:46.400 --> 00:53:48.400
 >> Okay.

00:53:48.400 --> 00:53:50.680
 Commissioner Garland.

00:53:50.680 --> 00:53:52.720
 >> And I will second that motion.

00:53:52.720 --> 00:53:53.720
 >> Okay.

00:53:53.720 --> 00:54:01.200
 Yeah, I'll just share that I've watched a lot of discussions about this northwest corner

00:54:01.200 --> 00:54:10.640
 of our city over the last six to eight years, and this ticks a lot of the boxes as far as

00:54:10.640 --> 00:54:21.560
 concern over some of the less desirable visual impacts of industrial development.

00:54:21.560 --> 00:54:27.480
 It brings future development into our modern code with our new tree code, that sort of

00:54:27.480 --> 00:54:28.480
 thing.

00:54:28.480 --> 00:54:32.940
 So there is some tree cover on the southeast portion of this site that I know our residents

00:54:32.940 --> 00:54:37.840
 care about, so that better protects that.

00:54:37.840 --> 00:54:48.800
 And I think that in addition, especially in areas where we have highways or future freeways

00:54:48.800 --> 00:54:58.040
 existing and a lot of stuff going on, I think that these types of uses lend themselves to

00:54:58.040 --> 00:55:06.800
 that sort of placement, primarily so that you don't try to mix, you know, people trying

00:55:06.800 --> 00:55:15.080
 to get local access to high volume sort of businesses and high density living situations

00:55:15.080 --> 00:55:22.040
 right next to a freeway where people are also trying to drive 90 miles an hour, so I'm appreciative

00:55:22.040 --> 00:55:24.800
 of the project as well.

00:55:24.800 --> 00:55:26.680
 Any other discussion?

00:55:26.680 --> 00:55:27.680
 >> I think you're right.

00:55:27.680 --> 00:55:32.200
 I think this would be a nice compliment, especially a compliment to what's on the other side of

00:55:32.200 --> 00:55:38.160
 35 where you have a little bit more industrial warehouse, and this will kind of elevate that

00:55:38.160 --> 00:55:41.160
 area.

00:55:41.160 --> 00:55:45.080
 >> Okay.

00:55:45.080 --> 00:55:52.280
 Seeing no more discussion, I'll call for a vote on the board.

00:55:52.280 --> 00:55:55.720
 That item passes 4-0.

00:55:55.720 --> 00:56:03.440
 That brings us to item 6A, the planning and zoning commission matrix.

00:56:03.440 --> 00:56:04.440
 Thank you.

00:56:04.440 --> 00:56:13.000
 >> Good evening, and I do have a few updates for you all, so let me get to my notes.

00:56:13.000 --> 00:56:16.640
 Since our last meeting, council has met and did take action on a few items that have been

00:56:16.640 --> 00:56:23.480
 before you all, so the oak street boardinghouse specific use permit was approved, the industrial

00:56:23.480 --> 00:56:30.360
 rezoning on springside near Corbin road was also approved by council, and then the if

00:56:30.360 --> 00:56:34.480
 you remember a few weeks ago, the MN zoning for the nonconforming commercial property

00:56:34.480 --> 00:56:39.440
 out on the west side of 380 was also approved by council at their last meeting.

00:56:39.440 --> 00:56:44.960
 I believe we did update the matrix to include your request from last meeting, Commissioner

00:56:44.960 --> 00:56:53.880
 McDuff, and then Chair Pruitt, you had requested that we pass along to the mobility committee,

00:56:53.880 --> 00:56:58.000
 just a request that they look into how parking prohibitions in residential areas and other

00:56:58.000 --> 00:57:01.680
 similar things could be handled without requiring council action.

00:57:01.680 --> 00:57:06.960
 I discussed that with our director of transportation services, and he indicated that the mobility

00:57:06.960 --> 00:57:11.920
 committee actually tasked staff with a very similar request over the summer, and they

00:57:11.920 --> 00:57:15.520
 are hoping to have an update to them in September on that item.

00:57:15.520 --> 00:57:16.520
 >> Good.

00:57:16.520 --> 00:57:17.520
 Thank you.

00:57:17.520 --> 00:57:19.080
 >> I believe that is all I have for you all.

00:57:19.080 --> 00:57:20.080
 >> Okay.

00:57:20.080 --> 00:57:26.280
 Any other requests or items to add to the matrix at this time?

00:57:26.280 --> 00:57:28.120
 Not seeing any.

00:57:28.120 --> 00:57:36.640
 Our last item is item 7 concluding remarks concluding items, sorry.

00:57:36.640 --> 00:57:41.040
 Any concluding items?

00:57:41.040 --> 00:57:46.280
 I guess enjoy the cooler weather the rest of this week.

00:57:46.280 --> 00:57:51.520
 Don't get too used to it, because then maybe the heat will come back.

00:57:51.520 --> 00:57:52.520
 Thank you very much.

00:57:52.520 --> 00:57:59.440
 With that, at 7.04 this evening, I will call our meeting to a close.