1 00:00:00,000 --> 00:00:06,000 Good morning and welcome to the regularly scheduled Public Utilities Board meeting for 2 00:00:06,000 --> 00:00:09,240 August 25th 2025. 3 00:00:09,240 --> 00:00:12,940 It's 9am and we are starting the meeting. 4 00:00:12,940 --> 00:00:18,080 First are there any presentations from the public? 5 00:00:18,080 --> 00:00:21,000 Seeing none we'll move on to the consent agenda. 6 00:00:21,000 --> 00:00:28,240 Does anybody wish to pull an item for discussion? 7 00:00:28,240 --> 00:00:30,440 Seeing none we'll entertain a motion. 8 00:00:30,440 --> 00:00:31,520 Move approval. 9 00:00:31,520 --> 00:00:33,800 Susan moves approval. 10 00:00:33,800 --> 00:00:34,800 Lee seconds. 11 00:00:34,800 --> 00:00:36,680 All in favor say aye. 12 00:00:36,680 --> 00:00:37,680 Aye. 13 00:00:37,680 --> 00:00:41,240 Motion carries unanimously. 14 00:00:41,240 --> 00:00:44,480 Now moving on to items for individual consideration. 15 00:00:44,480 --> 00:00:49,160 Item A is consider approval of the August 11th minutes. 16 00:00:49,160 --> 00:00:52,160 Do we have a motion? 17 00:00:52,160 --> 00:00:53,160 So moved. 18 00:00:53,160 --> 00:00:54,160 We have a motion. 19 00:00:54,160 --> 00:00:55,160 Second. 20 00:00:55,160 --> 00:00:56,160 And a second. 21 00:00:56,160 --> 00:00:57,160 All in favor please say aye. 22 00:00:57,160 --> 00:00:58,160 Aye. 23 00:00:58,160 --> 00:01:01,640 Motion passes unanimously. 24 00:01:01,640 --> 00:01:11,660 Item B is consider adopting a rate schedule for ECALL effective October 15th. 25 00:01:11,660 --> 00:01:17,320 We have a presentation and discussion planned in closed session due to competitive matters 26 00:01:17,320 --> 00:01:18,320 on this. 27 00:01:18,320 --> 00:01:25,580 So we will hold this one until after the work session and the closed session. 28 00:01:25,580 --> 00:01:29,480 Moving on to item C. Let's see. 29 00:01:29,480 --> 00:01:34,840 Consider recommending adoption of a contract with Mayhill renewables for a renewable natural 30 00:01:34,840 --> 00:01:39,320 gas facility at the landfill. 31 00:01:39,320 --> 00:01:44,000 Good morning everyone. 32 00:01:44,000 --> 00:01:49,720 Brenda Haney director of solid waste with the city of Denton. 33 00:01:49,720 --> 00:01:51,520 Happy to be here with you this morning. 34 00:01:51,520 --> 00:01:53,320 Bring this project hopefully home. 35 00:01:53,320 --> 00:01:55,560 It's been a long one. 36 00:01:55,560 --> 00:01:59,680 So just a quick little run down of where we've been on this project. 37 00:01:59,680 --> 00:02:05,280 We have an active gas collection system and we currently flair that and have been doing 38 00:02:05,280 --> 00:02:09,040 so for a period of time. 39 00:02:09,040 --> 00:02:12,920 That is a currently we're treating it a little bit as a liability but we want to turn that 40 00:02:12,920 --> 00:02:14,000 into an asset. 41 00:02:14,000 --> 00:02:18,240 And so we are working to execute this agreement that will move us forward, will give us a 42 00:02:18,240 --> 00:02:25,440 beneficial reuse of that landfill gas, lessen our carbon footprint and turn something beneficial 43 00:02:25,440 --> 00:02:32,520 and profitable out of one of the nuisances of owning and operating a landfill. 44 00:02:32,520 --> 00:02:34,760 So just a little bit of a background. 45 00:02:34,760 --> 00:02:40,280 We had a landfill gas to energy facility that has operated up until 2020. 46 00:02:40,280 --> 00:02:44,760 That facility was shut down and ultimately decommissioned. 47 00:02:44,760 --> 00:02:49,480 We started the process again to look at what our options might be going forward. 48 00:02:49,480 --> 00:02:56,600 And we specifically wanted to go forward with a project to refine that gas and turn it into 49 00:02:56,600 --> 00:02:58,320 a high BTU fuel. 50 00:02:58,320 --> 00:03:05,980 In 2023 we issued an RFP that staled during the negotiation process and now we issued 51 00:03:05,980 --> 00:03:10,240 another one in 2024 and I'm happy to say it's been a long process. 52 00:03:10,240 --> 00:03:15,440 We are here today and we've got representatives from Moro Energy with us so that we can move 53 00:03:15,440 --> 00:03:17,240 forward with this project. 54 00:03:17,240 --> 00:03:20,680 They were selected for this, just a little bit of history. 55 00:03:20,680 --> 00:03:26,500 Also at the system out there we have 139 gas wells that are currently in place and that 56 00:03:26,500 --> 00:03:30,560 gas is collected and simply flared off. 57 00:03:30,560 --> 00:03:34,280 So again, I told you this has been a long process. 58 00:03:34,280 --> 00:03:39,360 So we've got Moro Energy, they'll be doing business as Mayhill renewables on our site. 59 00:03:39,360 --> 00:03:43,840 They'll assume the operations of our well field, expand that, I'm assuming expand that 60 00:03:43,840 --> 00:03:49,800 well field, improve the overall gas collection that happens out there and they'll clean and 61 00:03:49,800 --> 00:03:51,440 compress that and sell that. 62 00:03:51,440 --> 00:03:58,660 And the open market, largely as a high BTU fuel, put it in the Atmos line most likely. 63 00:03:58,660 --> 00:04:02,920 So at this point we're asking for approval to execute both the lease agreement and the 64 00:04:02,920 --> 00:04:06,760 gas rights agreement and with that I will stand for any questions. 65 00:04:06,760 --> 00:04:17,800 Susan do you have a question? 66 00:04:17,800 --> 00:04:21,060 Remind me why we stopped doing it in 2020 and decommissioned. 67 00:04:21,060 --> 00:04:22,960 I was on the board, I should remember but I don't. 68 00:04:22,960 --> 00:04:28,440 Well I wasn't here and we were just having issues really where we weren't having a very 69 00:04:28,440 --> 00:04:33,520 effective system and we were having problems with the contractor on that and so we wanted 70 00:04:33,520 --> 00:04:39,520 to get out of that project and get us into a more beneficial project going forward. 71 00:04:39,520 --> 00:04:42,040 So it's kind of obsolete and this is new stuff. 72 00:04:42,040 --> 00:04:43,040 Alright, thank you. 73 00:04:43,040 --> 00:04:50,440 We have an old antiquated flare that we're using now. 74 00:04:50,440 --> 00:04:55,440 This is just a curiosity question but had any consideration ever been given to having 75 00:04:55,440 --> 00:04:58,600 the city vehicles use this gas? 76 00:04:58,600 --> 00:05:01,920 There has been some consideration that was part of what was trying to be done in the 77 00:05:01,920 --> 00:05:05,560 past wasn't terribly successful. 78 00:05:05,560 --> 00:05:12,120 There are a lot of different fueling systems being considered out there for all city vehicles, 79 00:05:12,120 --> 00:05:14,080 garbage trucks in particular. 80 00:05:14,080 --> 00:05:24,160 Right now most are being run on some sort of electric is kind of in vogue right now 81 00:05:24,160 --> 00:05:26,000 and there is some CNG that is out there. 82 00:05:26,000 --> 00:05:30,000 We've had CNG, we've seized operation on that. 83 00:05:30,000 --> 00:05:33,900 If it comes back around to being something that is feasible and practical and something 84 00:05:33,900 --> 00:05:36,120 that we can do, we'll certainly look at that. 85 00:05:36,120 --> 00:05:40,280 I'm just curious, I lived somewhere once where they did that and they took the gas and used 86 00:05:40,280 --> 00:05:41,280 it in their vehicle. 87 00:05:41,280 --> 00:05:42,280 Right. 88 00:05:42,280 --> 00:05:43,280 Thank you. 89 00:05:43,280 --> 00:05:46,400 Yeah, yes sir. 90 00:05:46,400 --> 00:05:47,400 This is somewhat related. 91 00:05:47,400 --> 00:05:51,740 I was curious if the landfill is still operating the ELR system. 92 00:05:51,740 --> 00:05:55,200 We are not currently operating it. 93 00:05:55,200 --> 00:05:59,000 It will be something that we'll consider as we go forward. 94 00:05:59,000 --> 00:06:04,140 I know has been some past controversy about the benefits of that system. 95 00:06:04,140 --> 00:06:11,040 One of the things that happens with the landfill is throughout its life and later in its acceptance 96 00:06:11,040 --> 00:06:16,360 of waste we start to really kick off that gas production and that number goes up. 97 00:06:16,360 --> 00:06:20,720 One of the things that the ELR system allows us to do is accelerate that degradation of 98 00:06:20,720 --> 00:06:25,160 the waste and then capture that gas a little quicker and while we're there. 99 00:06:25,160 --> 00:06:28,060 So that's something that we'll consider as we go forward. 100 00:06:28,060 --> 00:06:32,280 We're going to reassess whether there's some validity to moving forward with an ELR system 101 00:06:32,280 --> 00:06:33,280 again. 102 00:06:33,280 --> 00:06:34,280 Okay. 103 00:06:34,280 --> 00:06:37,520 Thank you. 104 00:06:37,520 --> 00:06:43,880 Any further questions to entertain a motion? 105 00:06:43,880 --> 00:06:46,800 I'll move approval. 106 00:06:46,800 --> 00:06:48,920 We have a motion and a second. 107 00:06:48,920 --> 00:06:50,520 All in favor please say aye. 108 00:06:50,520 --> 00:06:51,520 Aye. 109 00:06:51,520 --> 00:06:52,520 Any opposed? 110 00:06:52,520 --> 00:06:54,520 The motion carries unanimously. 111 00:06:54,520 --> 00:06:55,520 Awesome. 112 00:06:55,520 --> 00:06:56,520 Thank you. 113 00:06:56,520 --> 00:06:57,520 Thank you. 114 00:06:57,520 --> 00:06:58,520 Thank you. 115 00:06:58,520 --> 00:07:05,840 And now we'll move on to section D management reports. 116 00:07:05,840 --> 00:07:06,920 Good morning. 117 00:07:06,920 --> 00:07:18,800 There are no future agenda items nor are there any new business items listed. 118 00:07:18,800 --> 00:07:42,160 If nobody is requesting any new items we'll move on to our work session. 119 00:07:42,160 --> 00:07:47,160 Chair board members, Krista Foster, customer service manager and I'm here to give you a 120 00:07:47,160 --> 00:07:49,280 utility billing update. 121 00:07:49,280 --> 00:07:54,400 So as part of our background last year city council approved funding for us to conduct 122 00:07:54,400 --> 00:08:00,160 a review on our billing practices and collections policies and so we brought in an independent 123 00:08:00,160 --> 00:08:05,440 consultant who conducted staff interviews, did call evaluations, looked at our performance 124 00:08:05,440 --> 00:08:09,960 over time, collected some of our policies and then compared those against benchmarks 125 00:08:09,960 --> 00:08:11,240 in the industry. 126 00:08:11,240 --> 00:08:16,640 So what we're going to do is a high level review on the benchmarking and revenue trends. 127 00:08:16,640 --> 00:08:22,120 And we're going to look closely at our commercial deposit practices, payment arrangements and 128 00:08:22,120 --> 00:08:23,120 leak adjustments. 129 00:08:23,120 --> 00:08:28,800 We'll do a quick summary at the end and then open up for questions and discussion. 130 00:08:28,800 --> 00:08:35,000 So as you can see over the last five years Denton has performed very consistently and 131 00:08:35,000 --> 00:08:41,340 against the benchmark standards of the industry Denton is outperforming those industry leaders. 132 00:08:41,340 --> 00:08:48,560 So we have provided very consistent revenue and collections performance over time with 133 00:08:48,560 --> 00:08:53,680 exception of the pandemic you can see that slight uptick during the pandemic. 134 00:08:53,680 --> 00:09:00,900 This is comparing us against 100 different U.S. utilities and 22 of those being Texas. 135 00:09:00,900 --> 00:09:06,400 So in reviewing commercial deposits what we ask is that she look at it and see how do 136 00:09:06,400 --> 00:09:12,240 we compare with what private industry is doing what other municipals that provide electric 137 00:09:12,240 --> 00:09:17,400 are doing and what we found is our calculation is consistent. 138 00:09:17,400 --> 00:09:23,720 Our application of supplying deposit interest is consistent that our retention period is 139 00:09:23,720 --> 00:09:29,840 not aligned with the majority of the cities and that our current ordinance is written 140 00:09:29,840 --> 00:09:35,040 in such a way that it requires us to manually screen every account before we can do a refund 141 00:09:35,040 --> 00:09:36,460 of a deposit. 142 00:09:36,460 --> 00:09:42,480 So what is being recommended is that we retain residential deposits at 12 months as we do 143 00:09:42,480 --> 00:09:49,080 today that for commercial deposits that we refund at 24 months of good payment history 144 00:09:49,080 --> 00:09:53,720 and there are qualifications instead of no late payments no disconnections no whatever 145 00:09:53,720 --> 00:09:59,240 are an A credit rating with our system no disconnections no meter tampering and that 146 00:09:59,240 --> 00:10:01,680 your account is current. 147 00:10:01,680 --> 00:10:07,040 The reason that we're looking at 24 months for that deposit retention is that commercial 148 00:10:07,040 --> 00:10:14,340 new commercial businesses carry a higher risk 72 percent of commercial new commercial businesses 149 00:10:14,340 --> 00:10:16,940 and didn't close within two years. 150 00:10:16,940 --> 00:10:24,380 So this would hold the retention rate to cover that risk and that is consistent with the 151 00:10:24,380 --> 00:10:32,840 overall community that they have those who refund deposits average at 21 months. 152 00:10:32,840 --> 00:10:38,920 So payment arrangements what we found is in the review that the way that the ordinance 153 00:10:38,920 --> 00:10:44,320 is written we have date calculation that's manual so it increases the likelihood of human 154 00:10:44,320 --> 00:10:45,320 error. 155 00:10:45,320 --> 00:10:51,140 It creates an arbitrary date for a customer to remember that our eligibility and administration 156 00:10:51,140 --> 00:10:59,600 is restrictive because we only allow one adjustment or one arrangement per six months and any 157 00:10:59,600 --> 00:11:05,400 deviation to that ordinance guideline would require council action. 158 00:11:05,400 --> 00:11:10,020 So if that customer has had one arrangement in the last six months they've now experienced 159 00:11:10,020 --> 00:11:13,560 a water leak and have a two thousand dollar bill. 160 00:11:13,560 --> 00:11:17,720 We would have to go to city council to be able to do something to work with that person. 161 00:11:17,720 --> 00:11:23,200 So what we are looking at recommending is moving the due date to be your current bill 162 00:11:23,200 --> 00:11:29,200 date that way it's always clearly marked on your bill customer has easy access to it. 163 00:11:29,200 --> 00:11:33,960 It's already on the screens that the representatives are using so there's no manual calculation 164 00:11:33,960 --> 00:11:40,040 of dates that we remove the number of restrictions on from being this is how many arrangements 165 00:11:40,040 --> 00:11:45,960 you can have to instead you can have as many arrangements as you need as long as you're 166 00:11:45,960 --> 00:11:47,360 fulfilling them. 167 00:11:47,360 --> 00:11:51,360 If you're failing to fulfill them this is when we have to apply additional work with 168 00:11:51,360 --> 00:11:55,920 the fields and with staff on trying to now remedy that account. 169 00:11:55,920 --> 00:12:02,400 So if you failed two agreements in a 12 month period of time that you have a 12 month restriction 170 00:12:02,400 --> 00:12:06,800 of not being able to set an agreement and then we will allow you to do that again so 171 00:12:06,800 --> 00:12:09,640 that there you're holding them accountable. 172 00:12:09,640 --> 00:12:14,640 Then we want to look at updating the ordinance to authorize the program authority to the 173 00:12:14,640 --> 00:12:21,480 manager and then discretion to the department head for anything that would be a exception 174 00:12:21,480 --> 00:12:28,800 to the rule and then make sure that we ensure that city council has full notification before 175 00:12:28,800 --> 00:12:33,120 any program changes are made through something like a Friday report so that they can bring 176 00:12:33,120 --> 00:12:37,840 things back in if there are questions or concerns so that city council would still maintain 177 00:12:37,840 --> 00:12:41,320 oversight on that program. 178 00:12:41,320 --> 00:12:46,800 And then leak adjustments we ran into some inadvertent wording problems from when this 179 00:12:46,800 --> 00:12:51,600 came through a couple of years ago so we want to make sure that we get those corrected and 180 00:12:51,600 --> 00:12:54,040 make sure we're in alignment with other cities. 181 00:12:54,040 --> 00:13:00,240 So what we found is the places that we are not aligned with other cities is the process 182 00:13:00,240 --> 00:13:03,740 for a leak adjustment is hard coded in city ordinance. 183 00:13:03,740 --> 00:13:09,840 So any deviation to it would require council intervention that they found that our filing 184 00:13:09,840 --> 00:13:16,000 time was a little shorter than what the benchmark showed and that we had a little bit of a restrictive 185 00:13:16,000 --> 00:13:17,880 policy in comparison. 186 00:13:17,880 --> 00:13:23,240 We didn't have consideration at that time for AMI metering for water and lower customer 187 00:13:23,240 --> 00:13:30,600 eligibility because we had an again oversight that the language excluded renters because 188 00:13:30,600 --> 00:13:32,620 they cannot pull a permit. 189 00:13:32,620 --> 00:13:39,260 So what we're looking for is we're going to revise the restrictions so that residential 190 00:13:39,260 --> 00:13:45,380 customers there would be no cap but commercial customers would cap their loss at one hundred 191 00:13:45,380 --> 00:13:46,880 thousand gallons. 192 00:13:46,880 --> 00:13:52,360 We've been asked to add a provision for sprinklers and pools but we would cap that at five thousand 193 00:13:52,360 --> 00:13:57,520 gallons and at a reduced rate over what a normal leak adjustment would be. 194 00:13:57,520 --> 00:14:02,240 So that way there is some provision for those customers but it is going to protect the city 195 00:14:02,240 --> 00:14:05,160 from significant cost. 196 00:14:05,160 --> 00:14:10,640 We will increase our submission deadline to 60 days and then we need to update the ordinance 197 00:14:10,640 --> 00:14:16,320 to make sure that the provision for renters is included and again authorizing program 198 00:14:16,320 --> 00:14:22,420 authority to city manager discretion to customer service head of customer service and then 199 00:14:22,420 --> 00:14:31,120 council getting provisions for any changes are made and add language for AMI metering. 200 00:14:31,120 --> 00:14:38,940 So in summary collections is performing better than the industry and it's doing so consistently 201 00:14:38,940 --> 00:14:44,240 and more effective and cost efficient and then we want to say our recommendations is 202 00:14:44,240 --> 00:14:49,920 to work on being more responsible responsive to customer needs in the way that we're doing 203 00:14:49,920 --> 00:14:55,000 commercial deposits payment arrangements and leak adjustments and with that I'll answer 204 00:14:55,000 --> 00:14:58,000 questions. 205 00:14:58,000 --> 00:15:01,920 Do we have any questions. 206 00:15:01,920 --> 00:15:05,400 Customer service there are always questions going back a few slides where you're talking 207 00:15:05,400 --> 00:15:10,200 about your deposit requirements and you have the credit rating of a what are you using 208 00:15:10,200 --> 00:15:11,560 to determine that credit rating. 209 00:15:11,560 --> 00:15:18,200 So it is an internal scoring system that evaluates the number of late payments disconnections 210 00:15:18,200 --> 00:15:21,680 and other payment anomalies. 211 00:15:21,680 --> 00:15:25,520 So it is calculated automatically on a 12 month rolling period. 212 00:15:25,520 --> 00:15:31,320 So it's an internal metric based on our correct and it is defined in city ordinance. 213 00:15:31,320 --> 00:15:35,920 And if customers don't need that credit rating are they able to get an understanding of why 214 00:15:35,920 --> 00:15:43,840 they're not meeting that if yes yes we can go back and be able to explain that. 215 00:15:43,840 --> 00:15:53,000 Yes I'm curiosity back on page prior to the summary it appears that the program authority 216 00:15:53,000 --> 00:15:59,080 goes to the city manager and then the head of customer service whereas on the other remarks 217 00:15:59,080 --> 00:16:02,120 it went from the city manager to the department head. 218 00:16:02,120 --> 00:16:07,400 This is the same the head of customer service that department head but that doesn't include 219 00:16:07,400 --> 00:16:11,600 the department head just a city manager. 220 00:16:11,600 --> 00:16:19,680 So I'm curious should the department head also have that discretion rather than wait 221 00:16:19,680 --> 00:16:25,720 for the city manager considering the breadth of that person's duties. 222 00:16:25,720 --> 00:16:31,080 What's listed is program authority to city manager meaning the city manager can approve 223 00:16:31,080 --> 00:16:35,320 like what the program guidelines are oh changes to the right. 224 00:16:35,320 --> 00:16:39,920 I'm sorry my apology I was thinking in terms of you know actual approvals whereas before 225 00:16:39,920 --> 00:16:48,840 you know that would go through the department head very well thank you. 226 00:16:48,840 --> 00:16:56,720 Any further questions. 227 00:16:56,720 --> 00:17:03,120 So I think this you know looks like a good plan removing that requirement of having to 228 00:17:03,120 --> 00:17:08,280 go to city council putting that authority in staff I think is appropriate these programs 229 00:17:08,280 --> 00:17:15,640 probably need to get adjusted you know every few years based on changes in the market changes 230 00:17:15,640 --> 00:17:21,500 in the community so I think I feel like that's an appropriate plan. 231 00:17:21,500 --> 00:17:24,400 Anybody else have any guidance to staff. 232 00:17:24,400 --> 00:17:29,680 Do we need to approve this to move forward or this is just informational yeah and any 233 00:17:29,680 --> 00:17:31,400 guidance anything that you'd like to see. 234 00:17:31,400 --> 00:17:35,760 I mean I think that's impressive the results that you guys have had thank you compared 235 00:17:35,760 --> 00:17:47,160 to the industry average. 236 00:17:47,160 --> 00:17:55,560 And now we will move into our closed session the public utilities board at 917 a.m. will 237 00:17:55,560 --> 00:18:00,640 convene in closed session to deliberate the closed meeting items set forth in the agenda 238 00:18:00,640 --> 00:18:06,800 which are the following pub 25153 deliberations regarding certain public power utilities competitive 239 00:18:06,800 --> 00:18:17,520 matters under Texas government code section five five one dot zero eight six. 240 00:18:17,520 --> 00:18:23,960 The public utility board has now at 927 a.m. reconvened from closed closed session and no 241 00:18:23,960 --> 00:18:26,220 official action was taken. 242 00:18:26,220 --> 00:18:33,840 We will now consider individual item for individual consideration item B adoption of an ordinance 243 00:18:33,840 --> 00:18:47,240 establishing the schedule of rates for electric service for ECL. 244 00:18:47,240 --> 00:18:52,640 Our transmission cost recovery factor so just a quick overview of our current rates our 245 00:18:52,640 --> 00:18:58,720 native load ECA is set at point zero four six two cents per KWH does provide a buffer 246 00:18:58,720 --> 00:19:03,080 of plus or minus twenty million dollars for our ECA balance and we're not recommending 247 00:19:03,080 --> 00:19:04,680 any changes for this. 248 00:19:04,680 --> 00:19:10,560 Our large load ECA is currently at point zero five one five cents per KWH buffer of zero 249 00:19:10,560 --> 00:19:15,360 to twenty million dollars and our transmission cost recovery factor rates are shown here 250 00:19:15,360 --> 00:19:18,980 and we're not recommending any changes for this. 251 00:19:18,980 --> 00:19:23,800 So our large load ECA we are recommending an increase to point zero five seven seven 252 00:19:23,800 --> 00:19:32,440 cents effective October 15th our native load ECA forecasted account balance is shown here. 253 00:19:32,440 --> 00:19:36,640 If we maintain the rate of point zero four six two cents we will have a balance of nineteen 254 00:19:36,640 --> 00:19:41,660 point six million dollars by June of twenty twenty six again that account balance buffers 255 00:19:41,660 --> 00:19:47,760 plus or minus twenty million and our TCRF forecasted account balance as long as we maintain 256 00:19:47,760 --> 00:19:52,160 our current rate of point zero one seven six we will have a balance of six hundred and 257 00:19:52,160 --> 00:19:58,840 twenty three thousand by June of twenty twenty six. 258 00:19:58,840 --> 00:20:04,680 So our staff recommends an increase to our large load ECA effective October 15th again 259 00:20:04,680 --> 00:20:09,920 that's increasing it to point zero five seven seven cents and we would need a vote on this 260 00:20:09,920 --> 00:20:14,100 ordinance today. 261 00:20:14,100 --> 00:20:22,480 Is there any discussion or questions. 262 00:20:22,480 --> 00:20:29,840 Chair would entertain a motion like a motion from Mr. Newquist and second from Mr. Rybak 263 00:20:29,840 --> 00:20:33,960 all in favor of approval please say aye. 264 00:20:33,960 --> 00:20:35,440 Any opposed. 265 00:20:35,440 --> 00:20:38,420 Motion carries unanimously. 266 00:20:38,420 --> 00:20:44,440 We have no further business so we are adjourned.