 Good afternoon and welcome to the City of Denton Capital Improvement Advisory Committee

00:00:10.680 --> 00:00:13.760
 meeting on Wednesday, June 25th.

00:00:13.760 --> 00:00:20.200
 I will call this meeting to order with the quorum present at 4.01 p.m.

00:00:20.200 --> 00:00:36.280
 Our only item on the agenda here is Item 1a, CIAC 25-008.

00:00:36.280 --> 00:00:41.800
 And before you start your presentation, for those who are somewhat new to the commission

00:00:41.800 --> 00:00:48.040
 and the role of P&Z in this role, please explain for us.

00:00:48.040 --> 00:00:51.720
 Good evening, Chair and Planning, Zoning, Commissioners.

00:00:51.720 --> 00:00:54.360
 I'm Keisha Siriano, Assistant Plaint Director.

00:00:54.360 --> 00:00:58.600
 I'd just like to provide some guidance for the meeting today as many of you are new sitting

00:00:58.600 --> 00:01:01.320
 at the CIAC in this role.

00:01:01.320 --> 00:01:05.320
 And as Chair mentioned earlier, you see Jason here, so that is a requirement of the ordinance

00:01:05.320 --> 00:01:08.640
 that we have someone representing from our ETJ.

00:01:08.640 --> 00:01:13.160
 So now I'm going to quickly review the responsibilities of the CIAC.

00:01:13.160 --> 00:01:17.480
 So the Advisory Committee serves in an advisory capacity to the City Council and is established

00:01:17.480 --> 00:01:23.160
 to advise and assist the City Council in adopting land use to assumptions, review the Capital

00:01:23.160 --> 00:01:25.600
 Improvements Plan and file written comments.

00:01:25.600 --> 00:01:29.860
 And those written comments will be the minutes that are taken today, monitor and evaluate

00:01:29.860 --> 00:01:34.260
 implementation of the Capital Improvements Plan, file semi-annual reports with respect

00:01:34.260 --> 00:01:39.140
 to the progress of the Capital Improvements Plan, and report to City Council any perceived

00:01:39.140 --> 00:01:43.740
 inequities in implementing the plan or imposing the impact fee.

00:01:43.740 --> 00:01:49.000
 And lastly, advise City Council the need to update or revise the land use assumptions,

00:01:49.000 --> 00:01:51.720
 Capital Improvements Plan and impact fee.

00:01:51.720 --> 00:01:54.480
 And with that, I'll turn it over to Kyle.

00:01:54.480 --> 00:01:55.480
 Good afternoon.

00:01:55.480 --> 00:02:00.400
 I'm Kyle Pedigo, the Planning and Engineering Division Manager for Water Utilities.

00:02:00.400 --> 00:02:05.600
 I'm here today to present our final Water and Wastewater Impact Fee Study and request

00:02:05.600 --> 00:02:14.280
 approval to bring this to Council for adoption of the full proposed impact fees.

00:02:14.280 --> 00:02:18.120
 So a previous version of this was presented to the Capital Improvement Advisory Committee

00:02:18.120 --> 00:02:20.320
 in February of this year.

00:02:20.320 --> 00:02:24.340
 Before bringing it to City Council, we found some language in both the Hunter and Cole

00:02:24.340 --> 00:02:30.220
 operating agreements that needed to be addressed in the adopted study.

00:02:30.220 --> 00:02:34.400
 We worked closely with both our consultant and other city departments to ensure that

00:02:34.400 --> 00:02:40.240
 the requirements detailed in the Texas Local Government Code Section 395 and the Hunter

00:02:40.240 --> 00:02:43.080
 and Cole operating agreements were met.

00:02:43.080 --> 00:02:48.000
 Since the land use service units and Capital Improvement Plans were not altered, I'll

00:02:48.000 --> 00:02:53.000
 briefly explain the process before moving on to the calculated impact fees and Hunter

00:02:53.000 --> 00:02:58.960
 and Cole considerations.

00:02:58.960 --> 00:03:04.680
 Our land use assumptions and population growth projections mirror the Denton 2040 Comprehensive

00:03:04.680 --> 00:03:11.720
 Plan, showing a projected 8.1% growth in the zero to five-year time frame, which tapers

00:03:11.720 --> 00:03:21.680
 off to 3.4% in the five to 10-year time frame.

00:03:21.680 --> 00:03:24.920
 The service units are based on water meter sizing.

00:03:24.920 --> 00:03:29.880
 The city's smallest water meter, which is the 5/8 by 3/4 inch meter, is adequate to

00:03:29.880 --> 00:03:32.240
 serve a single-family home.

00:03:32.240 --> 00:03:38.320
 In comparison, a retail development would likely require a two-inch water meter.

00:03:38.320 --> 00:03:43.080
 The flow provided by the two-inch water meter is equivalent to eight times that of our smallest

00:03:43.080 --> 00:03:47.760
 meter, so therefore that retail development would be responsible for eight times the base

00:03:47.760 --> 00:03:54.400
 impact fee that we adopt.

00:03:54.400 --> 00:03:57.600
 This is the Water Impact Fee Capital Improvement Plan.

00:03:57.600 --> 00:04:02.880
 This mirrors the infrastructure that is proposed in the Water Master Plan that we plan to adopt

00:04:02.880 --> 00:04:04.920
 in August of this year.

00:04:04.920 --> 00:04:09.440
 The projects shown in blue represent existing infrastructure that still has capacity to

00:04:09.440 --> 00:04:11.160
 serve this projected growth.

00:04:11.160 --> 00:04:17.900
 Therefore, a portion of the installation cost is still recoverable through impact fees.

00:04:17.900 --> 00:04:23.040
 The projects shown in red represent planned infrastructure, which would be 100% recoverable

00:04:23.040 --> 00:04:30.160
 in our impact fee calculations.

00:04:30.160 --> 00:04:33.680
 This is the Wastewater Impact Fee Capital Improvement Plan.

00:04:33.680 --> 00:04:39.620
 This is based off of the 2023 Wastewater Master Plan, which was adopted in May of last year.

00:04:39.620 --> 00:04:44.000
 This is similar to the previous slide, where all of the projects shown in green are existing

00:04:44.000 --> 00:04:49.400
 infrastructure that still has capacity to serve, and therefore a portion of it is recoverable

00:04:49.400 --> 00:04:54.240
 through the impact fee calculation, and everything shown in red is future infrastructure that

00:04:54.240 --> 00:05:01.040
 is 100% recoverable.

00:05:01.040 --> 00:05:08.360
 This impact fee will not alter the existing water service areas, which are shown in this

00:05:08.360 --> 00:05:09.360
 map.

00:05:09.360 --> 00:05:13.520
 So the service areas are 1A, which is the central downtown area, 1B, which is the ring

00:05:13.520 --> 00:05:24.160
 around that area, and 2, which is focused on the west side of the Hickory Creek Basin.

00:05:24.160 --> 00:05:29.920
 Wastewater impact fees currently have a single service area due to our single water reclamation

00:05:29.920 --> 00:05:40.360
 plant, the Pecan Creek Water Reclamation Plant.

00:05:40.360 --> 00:05:45.360
 The new Wastewater Capital Improvement Plan shows the necessity of two additional water

00:05:45.360 --> 00:05:52.600
 reclamation plants to be constructed to accommodate the growth planned in the outlying areas.

00:05:52.600 --> 00:05:57.080
 Since each facility lines an independent drainage basin, Water Utilities is recommending the

00:05:57.080 --> 00:06:01.800
 division of the single wastewater service area into three separate wastewater service

00:06:01.800 --> 00:06:02.800
 areas.

00:06:02.800 --> 00:06:08.040
 This map is an overlay showing the drainage basins, the Clear Creek in blue to the north,

00:06:08.040 --> 00:06:12.840
 the existing Pecan Creek through the center of town in red, and the Hickory Creek to the

00:06:12.840 --> 00:06:18.680
 west in green.

00:06:18.680 --> 00:06:24.600
 To calculate impact fees, the estimated recoverable cost of the Capital Improvement Plan is divided

00:06:24.600 --> 00:06:28.480
 by the estimated number of units served.

00:06:28.480 --> 00:06:33.280
 If separate service areas were not implemented, this chart demonstrates the maximum impact

00:06:33.280 --> 00:06:35.240
 fees that would be eligible citywide.

00:06:35.240 --> 00:06:43.780
 So for water, you have a $583 million Capital Improvement Plan divided by 52,774 service

00:06:43.780 --> 00:06:47.480
 units for $11,046.

00:06:47.480 --> 00:06:55.160
 And for wastewater, you have the $707 million Capital Improvement Plan divided by a similar

00:06:55.160 --> 00:07:06.600
 number of service units for a $13,526 estimated fee.

00:07:06.600 --> 00:07:10.840
 Based on the existing water service areas and the proposed wastewater service areas,

00:07:10.840 --> 00:07:14.900
 this chart shows the proposed maximum impact fees per service area.

00:07:14.900 --> 00:07:21.080
 So for service area 1A for water, it would be a decrease of the existing impact fee of

00:07:21.080 --> 00:07:28.640
 $3,569 to $1,820 because that area is mostly built out.

00:07:28.640 --> 00:07:36.240
 For service area 1B, it would be an increase from $5,352 to $10,745.

00:07:36.240 --> 00:07:45.480
 For service area 2 of water, it would be an increase from $7,638 to $12,139.

00:07:45.480 --> 00:07:53.480
 For wastewater, since we have a current service area as a single unit, we have our current

00:07:53.480 --> 00:07:56.920
 accessible fee as $4,716.

00:07:56.920 --> 00:08:02.440
 Due to the treatment plant construction as the economic driver behind these fees, the

00:08:02.440 --> 00:08:07.440
 Pecan Creek, Hickory Creek, and Clear Creek basins would all see an increase.

00:08:07.440 --> 00:08:18.280
 Pecan Creek would increase to $11,615, Hickory Creek to $12,791, and Clear Creek to $17,916.

00:08:18.280 --> 00:08:23.080
 These are very slightly different from what was presented in February.

00:08:23.080 --> 00:08:28.640
 We found a calculation, we made some adjustments to the calculations.

00:08:28.640 --> 00:08:34.880
 So the Hickory Creek saw a reduction of roughly $1,500 and Clear Creek saw an increase of

00:08:34.880 --> 00:08:41.280
 roughly $80 per service unit.

00:08:41.280 --> 00:08:45.680
 For the Hunter and Coal Ranch considerations, so the City of Denton has existing operating

00:08:45.680 --> 00:08:50.720
 agreements with both the Hunter Ranch District and the Coal Ranch District, with the ordinance

00:08:50.720 --> 00:08:55.480
 numbers listed there, which stipulate certain calculations to be included with the water

00:08:55.480 --> 00:08:58.120
 and wastewater impact fee study.

00:08:58.120 --> 00:09:04.640
 The included appendix in the final study details the impact fee eligible projects considered

00:09:04.640 --> 00:09:09.640
 city off-sites and calculations regarding the impact fee of both the Hunter Ranch and

00:09:09.640 --> 00:09:11.980
 the Coal Ranch developments.

00:09:11.980 --> 00:09:16.640
 So according to the operating agreements, both Hunter and Coal Ranch are going to contribute

00:09:16.640 --> 00:09:24.120
 an additional six cent contract tax in excess of their impact fees toward certain infrastructure

00:09:24.120 --> 00:09:28.040
 on the capital improvement plan, which we list as the city off-sites.

00:09:28.040 --> 00:09:32.800
 The appendix is the agreed upon mechanism to track that collection and expenditure of

00:09:32.800 --> 00:09:41.460
 Hunter and Coal's contributions for their proportionate share of the city off-sites.

00:09:41.460 --> 00:09:46.080
 Staff recommends full adoption of the proposed maximum assessable impact fees for each service

00:09:46.080 --> 00:09:49.480
 area.

00:09:49.480 --> 00:09:56.560
 For next steps, we published the notice for public hearing on June 21st.

00:09:56.560 --> 00:10:00.160
 Today we're meeting with the Capital Improvement Advisory Committee.

00:10:00.160 --> 00:10:06.320
 On July 15th, we're set up for a work session with City Council to set the public hearing

00:10:06.320 --> 00:10:12.280
 meeting date and to review the impact fee study.

00:10:12.280 --> 00:10:18.680
 On July 22nd, we have the public hearing meeting set up with City Council.

00:10:18.680 --> 00:10:25.200
 On August 5th, we have the City Council Ordinance Update Meeting, and then we would follow up,

00:10:25.200 --> 00:10:33.400
 once it's adopted, with a Public Utilities Board memo update on September 22nd.

00:10:33.400 --> 00:10:34.400
 Any questions?

00:10:34.400 --> 00:10:37.400
 - Thank you, Kyle.

00:10:37.400 --> 00:10:41.920
 Let the record show that Commissioner Riggs is now present.

00:10:41.920 --> 00:10:42.920
 Questions?

00:10:42.920 --> 00:10:45.920
 Commissioner McTuffin.

00:10:45.920 --> 00:10:54.160
 - I couldn't repeat any of this out loud, but I understand everything, Kyle.

00:10:54.160 --> 00:10:56.240
 It's very well done.

00:10:56.240 --> 00:11:02.880
 May I ask if this is the maximum impact fee that we can charge legally?

00:11:02.880 --> 00:11:03.880
 - Yes.

00:11:03.880 --> 00:11:10.400
 So, due to the calculations, once we assembled the capital improvement plan and estimated

00:11:10.400 --> 00:11:13.800
 the service units, this is the maximum that we can charge.

00:11:13.800 --> 00:11:14.800
 - Okay.

00:11:14.800 --> 00:11:15.800
 Thank you.

00:11:15.800 --> 00:11:20.840
 And then I just had another comment on the criticality of this, I appreciate this, only

00:11:20.840 --> 00:11:27.240
 because of every day we have to have our water, and then we have to dispose of our wastewater,

00:11:27.240 --> 00:11:32.760
 so I realize, I think we all realize the criticality of this, so well done.

00:11:32.760 --> 00:11:33.760
 Thank you.

00:11:33.760 --> 00:11:34.760
 - Thank you.

00:11:34.760 --> 00:11:38.280
 - I had a question, Kyle.

00:11:38.280 --> 00:11:44.400
 If you could go back to the slide with the map of the wastewater projects, please?

00:11:44.400 --> 00:11:45.400
 - Yep.

00:11:45.400 --> 00:11:46.600
 - This one?

00:11:46.600 --> 00:11:47.600
 With the service areas?

00:11:47.600 --> 00:11:48.600
 - Yes.

00:11:48.600 --> 00:11:49.600
 Thank you.

00:11:49.600 --> 00:11:56.240
 - It's wonderfully all white anyway on the screen, but I think we get the idea from the

00:11:56.240 --> 00:11:58.280
 back up.

00:11:58.280 --> 00:12:06.160
 I guess when I look at this, the majority of the projects in the Pecan Creek section,

00:12:06.160 --> 00:12:16.160
 right, seem to be out in the mostly undeveloped low residential future land map area east

00:12:16.160 --> 00:12:17.640
 of Mayhill Road.

00:12:17.640 --> 00:12:18.920
 Is that accurate?

00:12:18.920 --> 00:12:22.120
 - That's correct for the conveyance.

00:12:22.120 --> 00:12:24.960
 - Okay.

00:12:24.960 --> 00:12:30.840
 It seems like that wastewater impact fee went up dramatically.

00:12:30.840 --> 00:12:35.960
 I know maybe three or four years ago when the CIAC was considering some roadway impact

00:12:35.960 --> 00:12:45.880
 fees, there was talk about some infill overlays or something to handle, even though it's in

00:12:45.880 --> 00:12:49.520
 the same drainage basin, right?

00:12:49.520 --> 00:12:53.800
 Most of the projects that it looks like we're building are for future buildout, not for

00:12:53.800 --> 00:13:01.080
 areas that already have the infrastructure, as you said, on the water side of the zone

00:13:01.080 --> 00:13:02.080
 1A.

00:13:02.080 --> 00:13:09.840
 I guess I'm just wondering, are we expecting some follow-ups in the future to offset or

00:13:09.840 --> 00:13:17.840
 handle the increased wastewater impact fee in the core where we already have infrastructure

00:13:17.840 --> 00:13:21.320
 so that we don't dissuade reinvestment in the core?

00:13:21.320 --> 00:13:25.680
 - The primary cost driver for that increase within the Pecan Creek Basin, which is the

00:13:25.680 --> 00:13:30.520
 core of the city, is not the conveyance shown here, the red lines.

00:13:30.520 --> 00:13:35.720
 It's the reconstruction of the Pecan Creek water reclamation plant.

00:13:35.720 --> 00:13:41.680
 That plant is near on 50 years old and near the end of its useful life cycle, and we're

00:13:41.680 --> 00:13:48.120
 currently performing a CMAR, a construction manager at risk project, to rebuild and expand

00:13:48.120 --> 00:13:53.080
 that plant.

00:13:53.080 --> 00:13:57.400
 That's the cost driver for that increase.

00:13:57.400 --> 00:14:01.960
 It is an increase in that area, but it is also lower than the outlying areas because

00:14:01.960 --> 00:14:07.680
 there's not nearly as much conveyance to construct, if that answers your question.

00:14:07.680 --> 00:14:11.160
 - Yeah, I think that helps.

00:14:11.160 --> 00:14:18.600
 That begs other questions about why we have an aging plant and no revenue to replace it

00:14:18.600 --> 00:14:25.120
 without growing more, but I'll leave that be.

00:14:25.120 --> 00:14:26.120
 Any other questions?

00:14:26.120 --> 00:14:27.120
 Commissioner Riggs?

00:14:27.120 --> 00:14:34.760
 - Yeah, I would say that this is a pretty common fee assessed by communities to essentially

00:14:34.760 --> 00:14:39.600
 fund that future infrastructure, and the idea is that you would want this infrastructure

00:14:39.600 --> 00:14:46.240
 in place before the development comes, so that way, development can actually happen.

00:14:46.240 --> 00:14:51.040
 But most of this, whenever we're looking at the land use, we're kind of assuming that

00:14:51.040 --> 00:14:56.080
 this is going to be assessed on basically the vacant properties, undeveloped properties.

00:14:56.080 --> 00:14:57.080
 - Correct.

00:14:57.080 --> 00:14:58.080
 - Okay.

00:14:58.080 --> 00:14:59.080
 Well done.

00:14:59.080 --> 00:15:00.080
 - Thank you.

00:15:00.080 --> 00:15:01.080
 - Any other questions?

00:15:01.080 --> 00:15:16.080
 I'm seeing none, so they do need direction from us on the amount.

00:15:16.080 --> 00:15:20.680
 I think the first time this came through, I guess specifically, any questions about the

00:15:20.680 --> 00:15:29.880
 Hunter Cole that's a new appendix, new confusion, a little bit, new accounting.

00:15:29.880 --> 00:15:37.640
 Okay, so you do need direction from us on what fee to recommend, and Steph is recommending

00:15:37.640 --> 00:15:41.600
 the full calculated fee, correct?

00:15:41.600 --> 00:15:42.600
 - Correct.

00:15:42.600 --> 00:15:44.680
 So we're recommending the fees shown on this slide.

00:15:44.680 --> 00:15:45.680
 - Okay.

00:15:45.680 --> 00:15:46.680
 So, Commissioner Riggs?

00:15:46.680 --> 00:15:53.320
 - So I don't know if it was in your presentation, I apologize for being late, but do you have

00:15:53.320 --> 00:16:00.280
 maybe some comparisons of what an impact fee might be to a development of a different type,

00:16:00.280 --> 00:16:05.480
 say like fast food restaurant versus residential or something of that nature?

00:16:05.480 --> 00:16:06.960
 We can get an idea.

00:16:06.960 --> 00:16:07.960
 - Yes.

00:16:07.960 --> 00:16:14.120
 So the service unit where the impact fees are calculated off of is the size of the water

00:16:14.120 --> 00:16:15.920
 meter installed for the establishment.

00:16:15.920 --> 00:16:21.780
 So our base water meter size for our single family, that was enough to serve a single

00:16:21.780 --> 00:16:28.520
 family home is our 5/8 by 3/4, which is the base impact fee that we're adopting.

00:16:28.520 --> 00:16:38.400
 For a large retail development of a big box store, mall type area, they would likely require

00:16:38.400 --> 00:16:39.760
 a two inch meter.

00:16:39.760 --> 00:16:43.880
 So we take and we compare the flow of that two inch meter to our base unit.

00:16:43.880 --> 00:16:47.900
 So that two inch meter can handle eight times the flow of our base unit.

00:16:47.900 --> 00:16:54.760
 So then that development would be responsible for eight times our base impact fee.

00:16:54.760 --> 00:17:02.400
 Then the two inch, I mean for a smaller development, we have, there's graduated meter sizing up

00:17:02.400 --> 00:17:05.620
 to that level.

00:17:05.620 --> 00:17:10.080
 - So a big box development, would that be like a Home Depot, Costco, something like that?

00:17:10.080 --> 00:17:18.140
 - Yeah, like a Home Depot and surrounding area.

00:17:18.140 --> 00:17:19.480
 Commissioner Dyer.

00:17:19.480 --> 00:17:27.160
 - Would you mind going back to the fee structure with the different, yes.

00:17:27.160 --> 00:17:31.960
 I'm sure you said this and just, you know, trying to process all this information.

00:17:31.960 --> 00:17:38.680
 On the wastewater side of things, why is Clear Creek so much higher than the other two?

00:17:38.680 --> 00:17:42.960
 - So if this map should give a good comparison.

00:17:42.960 --> 00:17:48.720
 So if you see on Pecan Creek with the green is the lowest, the green is all of our existing

00:17:48.720 --> 00:17:52.920
 infrastructure that's already built out, that only has a portion that's recoverable and

00:17:52.920 --> 00:17:55.160
 the red is the new infrastructure.

00:17:55.160 --> 00:18:00.380
 And Hickory Creek is lower than Clear because we already have some infrastructure out there.

00:18:00.380 --> 00:18:04.280
 With Clear Creek, we have almost no infrastructure up in that area.

00:18:04.280 --> 00:18:10.120
 So it would be a completely independent plant, water reclamation plant, plus all of the conveyance

00:18:10.120 --> 00:18:11.120
 upstream of that.

00:18:11.120 --> 00:18:12.120
 - Okay.

00:18:12.120 --> 00:18:13.120
 You're going from scratch.

00:18:13.120 --> 00:18:14.120
 - Going from scratch.

00:18:14.120 --> 00:18:18.560
 And then it's also compared on the number of service units.

00:18:18.560 --> 00:18:24.960
 So I know that there's a higher density out in Hickory Creek per acre of housing than

00:18:24.960 --> 00:18:27.360
 would probably be installed in the Clear Creek Basin.

00:18:27.360 --> 00:18:33.640
 - And have you guys calculated how long you think it's gonna take to have the funds to

00:18:33.640 --> 00:18:40.080
 be able to build these like, I mean, will there come a time where in those zones and

00:18:40.080 --> 00:18:45.640
 those areas of development, where you'll be able to lower the costs to the developers

00:18:45.640 --> 00:18:46.640
 to the fees?

00:18:46.640 --> 00:18:48.720
 Like, do we look at this again in five years?

00:18:48.720 --> 00:18:50.040
 Like what's the cycle?

00:18:50.040 --> 00:18:51.040
 - Potentially.

00:18:51.040 --> 00:18:54.400
 So this is a five year process where we recalculate and update.

00:18:54.400 --> 00:18:57.740
 And what we do is we take and we examine a 10 year window.

00:18:57.740 --> 00:19:03.360
 So these fees are based off of the infrastructure we expect to be built within 10 years.

00:19:03.360 --> 00:19:07.240
 - So that population that you were showing us, the five year and then the 10 year projections.

00:19:07.240 --> 00:19:08.240
 - Correct.

00:19:08.240 --> 00:19:12.280
 So then we come back in five years and then we redo it for the next 10 year window, redo

00:19:12.280 --> 00:19:13.280
 our calculations.

00:19:13.280 --> 00:19:14.280
 - Okay.

00:19:14.280 --> 00:19:15.280
 Thank you.

00:19:15.280 --> 00:19:16.280
 - Yes.

00:19:16.280 --> 00:19:20.880
 - I'd like to just touch on a couple of things.

00:19:20.880 --> 00:19:25.960
 One thing you said, something when you were comparing the Hickory Creek to the Clear Creek

00:19:25.960 --> 00:19:33.160
 Basin, that the future land use in the Hickory Creek is a little bit higher.

00:19:33.160 --> 00:19:35.040
 It's per acre, I guess.

00:19:35.040 --> 00:19:40.160
 And that would have the effect of lowering the capital cost per unit, essentially?

00:19:40.160 --> 00:19:41.160
 - Correct.

00:19:41.160 --> 00:19:42.160
 For the conveyance.

00:19:42.160 --> 00:19:49.280
 So because that area is a little further along in development, we know of developments that

00:19:49.280 --> 00:19:53.680
 we could calculate the density per acre and by increasing the number of units that are

00:19:53.680 --> 00:19:57.160
 served off of infrastructure, that lowers the price somewhat.

00:19:57.160 --> 00:19:58.160
 - Okay.

00:19:58.160 --> 00:20:06.480
 And I guess just to touch on my earlier point of the increased fee in the section where

00:20:06.480 --> 00:20:12.040
 we already have some conveyance, but we have an aging reclamation plant.

00:20:12.040 --> 00:20:19.640
 I'm pretty sure, gosh, more than 10 years ago now, the water department was moving toward

00:20:19.640 --> 00:20:28.040
 100% replacement schedule of capital infrastructure on revenue instead of depending on bond money.

00:20:28.040 --> 00:20:34.080
 Not for expansion of the system, obviously, but just for replacement, right?

00:20:34.080 --> 00:20:37.480
 Is that something we're looking at for the wastewater side of things?

00:20:37.480 --> 00:20:41.200
 I know there is a wastewater charge on the utility bill, right?

00:20:41.200 --> 00:20:47.140
 - Well, part of what these impact fees do is they reduce the amount of bond money.

00:20:47.140 --> 00:20:53.840
 By collecting the impact fee and having, letting development help pay for this infrastructure,

00:20:53.840 --> 00:20:59.800
 it reduces that amount of bond money that needs to be spent to replace the same infrastructure

00:20:59.800 --> 00:21:01.320
 that's aging.

00:21:01.320 --> 00:21:09.960
 - Okay, so then if we move forward with this and we get enough development to pay for replacing

00:21:09.960 --> 00:21:19.840
 the aging concrete water reclamation plant, then in 2080 when the new one is getting old,

00:21:19.840 --> 00:21:23.680
 we'll need additional development in order to be able to replace it and serve our existing

00:21:23.680 --> 00:21:24.680
 citizens?

00:21:24.680 --> 00:21:30.880
 - No, and Steven might be able to speak more towards our future plans or what we had in

00:21:30.880 --> 00:21:38.360
 the past with the revenue planning.

00:21:38.360 --> 00:21:41.720
 - Steven Gage, General Manager, Water Utilities and Street Operations.

00:21:41.720 --> 00:21:48.560
 Yes, we're absolutely moving towards a fully revenue funded scenario.

00:21:48.560 --> 00:21:57.600
 This is, the best way to put it is the previous leadership had all of the great intentions

00:21:57.600 --> 00:22:03.320
 of doing this the right way, but didn't execute as well, right?

00:22:03.320 --> 00:22:06.800
 And so we're coming back and we're doing the assessments and we're saying let's take

00:22:06.800 --> 00:22:14.920
 our time, let's build this infrastructure well, let's put in place asset management

00:22:14.920 --> 00:22:19.320
 programs so we can actually maintain it, so we can meet and/or exceed the useful life

00:22:19.320 --> 00:22:26.000
 of the assets, and let's diversify our financial portfolio so we're not just relying on debt.

00:22:26.000 --> 00:22:30.300
 And when we do rely on debt, it's not just issuing bonds, we're actually leveraging

00:22:30.300 --> 00:22:35.880
 programs like the Bureau of Reclamation has a lot of bond or actually grant funding that's

00:22:35.880 --> 00:22:40.580
 available that we can pursue to help offset the cost of this, and so we're working with

00:22:40.580 --> 00:22:45.800
 our grants department to identify those opportunities and pursue them.

00:22:45.800 --> 00:22:51.640
 We're also working with WIFIA, which is Water Infrastructure Innovation and Funding Act.

00:22:51.640 --> 00:22:56.640
 That's a federal program that allows us to utilize the federal government's bond rating,

00:22:56.640 --> 00:23:01.720
 which saves us in debt, so even though we're issuing debt, we're saving basically two basis

00:23:01.720 --> 00:23:07.000
 points off of the money that we're borrowing, so to put it in perspective, we did this very

00:23:07.000 --> 00:23:11.840
 similar thing to up at Ray Roberts when we did it, we're doing the expansion, and we

00:23:11.840 --> 00:23:17.020
 borrowed $195 million from the Texas Water Development Board, well by borrowing that

00:23:17.020 --> 00:23:22.480
 money from them and leveraging their debt or their credit rating, that project actually

00:23:22.480 --> 00:23:29.080
 saved the city about $48 million in long-term debt services, so those are the things that

00:23:29.080 --> 00:23:30.080
 we're doing.

00:23:30.080 --> 00:23:33.940
 It's gonna take us a little while to turn that ship back around, but that's definitely

00:23:33.940 --> 00:23:39.360
 the direction that we're going, and you'll also see that we're doing rate and fee studies

00:23:39.360 --> 00:23:43.820
 because we've been undercharging for the services that we've been delivering for years, and

00:23:43.820 --> 00:23:49.000
 so we're trying to level set there as well, so it's not about making money, it's about

00:23:49.000 --> 00:23:54.480
 recovering the cost associated with the services that we're delivering, and once we reach that

00:23:54.480 --> 00:24:01.040
 point where we're receiving those revenues, then we can revenue fund all this great investment

00:24:01.040 --> 00:24:04.180
 in infrastructure, and hopefully that answered your question, sir.

00:24:04.180 --> 00:24:09.960
 Yeah, it does, thank you, I understand it takes a long time to move, if there's anything

00:24:09.960 --> 00:24:17.200
 that we as a body can do to ensure that the best laid plans get moved through to fruition,

00:24:17.200 --> 00:24:18.200
 please let us know.

00:24:18.200 --> 00:24:19.200
 Absolutely, thank you.

00:24:19.200 --> 00:24:20.200
 Thank you.

00:24:20.200 --> 00:24:26.280
 So, any other questions, I don't know how everybody's thinking, you know, the first

00:24:26.280 --> 00:24:32.720
 time this came through, we did recommend the 100% fee collection as recommended by staff,

00:24:32.720 --> 00:24:39.360
 does anybody else have any other thoughts, different direction beyond that, or just general

00:24:39.360 --> 00:24:40.360
 comments?

00:24:40.360 --> 00:24:47.280
 So, I personally think that, obviously from my break, investing in your infrastructure

00:24:47.280 --> 00:24:53.320
 is super important, and the more funding sources that we can find keeps rates lower, you know,

00:24:53.320 --> 00:24:57.720
 so if this were all revenue funded, then the rates would be through the roof, and so I

00:24:57.720 --> 00:25:02.520
 really like what Stephen had to say about looking at WIFIA and all the grant packages,

00:25:02.520 --> 00:25:09.080
 but, you know, when we don't do 100%, then that means it's not 100% funded, so we have

00:25:09.080 --> 00:25:14.680
 to figure out how to fund that by other means, so I think it should go up 100%.

00:25:14.680 --> 00:25:19.640
 Okay, anyone else, Commissioner MacDuff?

00:25:19.640 --> 00:25:21.240
 Are you ready for a recommendation?

00:25:21.240 --> 00:25:22.240
 Sure.

00:25:22.240 --> 00:25:29.880
 I'd like to move approval to accept this report and to approve the 100% funding for the impact

00:25:29.880 --> 00:25:30.880
 fee.

00:25:30.880 --> 00:25:31.880
 Okay.

00:25:31.880 --> 00:25:32.880
 Is there a second?

00:25:32.880 --> 00:25:33.880
 I'll second.

00:25:33.880 --> 00:25:34.880
 Thank you.

00:25:34.880 --> 00:25:39.800
 Commissioner Riggs, any other comments or questions?

00:25:39.800 --> 00:25:43.520
 Okay.

00:25:43.520 --> 00:25:46.000
 We are posted for a vote on this, right?

00:25:46.000 --> 00:25:51.800
 Yeah, so, we'll take a voice vote, and just go down the line, so Commissioner MacDuff,

00:25:51.800 --> 00:25:52.800
 I'll say you.

00:25:52.800 --> 00:25:53.800
 Aye.

00:25:53.800 --> 00:25:54.800
 Commissioner Riggs.

00:25:54.800 --> 00:25:55.800
 Aye.

00:25:55.800 --> 00:25:56.800
 Commissioner McDade.

00:25:56.800 --> 00:25:57.800
 Aye.

00:25:57.800 --> 00:25:58.800
 Commissioner Dyer.

00:25:58.800 --> 00:25:59.800
 Aye.

00:25:59.800 --> 00:26:00.800
 Commissioner Kalaszczuk.

00:26:00.800 --> 00:26:01.800
 Aye.

00:26:01.800 --> 00:26:06.840
 And the Chair is an aye, so that passes 6-0.

00:26:06.840 --> 00:26:07.840
 Thank you very much.

00:26:07.840 --> 00:26:09.680
 Thank you.

00:26:09.680 --> 00:26:15.840
 And that will bring us to a close of our Capital Improvement Advisory Committee meeting.

00:26:15.840 --> 00:26:22.240
 Thank you, and we will reconvene as the Planning and Zoning Commission at 5 p.m. for the work

00:26:22.240 --> 00:26:22.640
 session.