 - Good afternoon and welcome to our work session

00:00:05.000 --> 00:00:09.060
 of the City of Denton Planning and Zoning Commission.

00:00:09.060 --> 00:00:11.960
 On March 19th, it is 5.03 p.m.

00:00:11.960 --> 00:00:13.160
 We'll call us to order.

00:00:13.160 --> 00:00:19.480
 Our first order of business is citizen comments

00:00:19.480 --> 00:00:24.480
 on the consent agenda and not seeing any comments.

00:00:24.480 --> 00:00:29.760
 We will move forward to the next item,

00:00:29.760 --> 00:00:33.520
 which is the, sorry,

00:00:33.520 --> 00:00:36.440
 questions on the consent agenda from the commission.

00:00:36.440 --> 00:00:41.800
 Seems quiet.

00:00:41.800 --> 00:00:45.200
 I take that as none.

00:00:45.200 --> 00:00:47.800
 So we will move on to the items

00:00:47.800 --> 00:00:49.640
 for individual consideration.

00:00:49.640 --> 00:00:58.840
 Good afternoon.

00:00:58.840 --> 00:01:00.060
 - Good afternoon.

00:01:00.060 --> 00:01:02.920
 Karen Robertson, Prince Will Planner.

00:01:02.920 --> 00:01:11.440
 This is a final plot for a approximately 20 acre property

00:01:11.440 --> 00:01:16.600
 on the northwest corner of I-35 and Robson Ranch Road.

00:01:16.600 --> 00:01:18.940
 Staff is recommending denial at this time

00:01:18.940 --> 00:01:21.020
 for the final plot as it does not comply

00:01:21.020 --> 00:01:23.000
 with our established criteria for approval,

00:01:23.000 --> 00:01:26.000
 but we have no objection to a final extension request

00:01:26.000 --> 00:01:26.960
 of April 9th.

00:01:29.200 --> 00:01:31.440
 - Looks like this is the first extension request.

00:01:31.440 --> 00:01:33.140
 Any questions on this item?

00:01:33.140 --> 00:01:35.840
 No?

00:01:35.840 --> 00:01:37.080
 Yes, Mr. Villarreal.

00:01:37.080 --> 00:01:39.120
 - Do we believe that with the extension request,

00:01:39.120 --> 00:01:42.700
 they'll be able to meet plot requirements by April 9th?

00:01:42.700 --> 00:01:43.540
 - Yes. - Okay.

00:01:43.540 --> 00:01:48.320
 - I see nothing else.

00:01:48.320 --> 00:01:49.160
 Thank you, Cameron.

00:01:49.160 --> 00:01:55.400
 Next item, item, sorry.

00:01:55.400 --> 00:01:59.900
 4B, FP250007.

00:01:59.900 --> 00:02:02.680
 It looks like Angie is up here and me instead.

00:02:02.680 --> 00:02:04.960
 - Yes, good evening.

00:02:04.960 --> 00:02:07.480
 Angie Manglaris, Development Review Manager.

00:02:07.480 --> 00:02:11.520
 I'm gonna be presenting this final plot this evening.

00:02:11.520 --> 00:02:14.560
 This is FP, this is not FP25.

00:02:14.560 --> 00:02:21.040
 This is FP250007.

00:02:21.040 --> 00:02:23.800
 This is a final plot for Elm's Bed Multifamily.

00:02:23.800 --> 00:02:26.400
 It's generally located at the northeast corner

00:02:26.400 --> 00:02:29.140
 of Audre Lane and Nottingham.

00:02:29.140 --> 00:02:31.440
 The intent of this final plot is to create one lot

00:02:31.440 --> 00:02:33.480
 for development of a future multifamily site.

00:02:33.480 --> 00:02:35.400
 At this time, they're not compliant

00:02:35.400 --> 00:02:37.280
 with all of our review criteria.

00:02:37.280 --> 00:02:39.600
 The applicant has requested a extension

00:02:39.600 --> 00:02:41.480
 to a date certain of April 9th.

00:02:41.480 --> 00:02:43.480
 This would be their first extension request.

00:02:43.480 --> 00:02:45.980
 I'm happy to answer any questions you all may have.

00:02:45.980 --> 00:02:53.120
 - Thank you.

00:02:53.120 --> 00:02:55.160
 Is there enough time for them to get this figured out

00:02:55.160 --> 00:02:56.880
 before April 9th?

00:02:56.880 --> 00:03:00.280
 Are they gonna have a final plot for us by April 9th?

00:03:00.280 --> 00:03:01.760
 - It does look like they have a handful

00:03:01.760 --> 00:03:05.120
 of lingering comments, but it is possible

00:03:05.120 --> 00:03:07.000
 that they do all get worked out by April 9th.

00:03:07.000 --> 00:03:10.140
 It's a little difficult for me to speak on their timing.

00:03:10.140 --> 00:03:10.980
 - Thank you.

00:03:10.980 --> 00:03:16.240
 - Seeing nothing else, thank you, Angie.

00:03:16.240 --> 00:03:22.040
 Next is item 4C, FP250009.

00:03:24.120 --> 00:03:26.180
 - Good afternoon, Erins.

00:03:26.180 --> 00:03:28.460
 - Good afternoon.

00:03:28.460 --> 00:03:36.440
 This is FP250009.

00:03:36.440 --> 00:03:38.600
 This is Hilltop Village addition.

00:03:38.600 --> 00:03:41.520
 This is an approximately six acre site located

00:03:41.520 --> 00:03:45.620
 in the ETJ, east of Hilltop Road.

00:03:45.620 --> 00:03:47.940
 At this time, this plot does not meet our criteria

00:03:47.940 --> 00:03:50.160
 for approval and staff is recommending denial,

00:03:50.160 --> 00:03:52.380
 but we have no objection to their requested extension

00:03:52.380 --> 00:03:53.220
 to April 9th.

00:03:53.220 --> 00:03:57.200
 First, this would be a first extension request.

00:03:57.200 --> 00:04:00.160
 - And Commissioner Villarreal.

00:04:00.160 --> 00:04:01.000
 - Thank you.

00:04:01.000 --> 00:04:03.440
 So are we expecting this to be good to go by that time?

00:04:03.440 --> 00:04:04.280
 - I do expect that.

00:04:04.280 --> 00:04:05.960
 - Okay, thank you.

00:04:05.960 --> 00:04:07.820
 - Thank you, Erins.

00:04:07.820 --> 00:04:12.820
 Next is 4E, sorry, my D, thank you.

00:04:12.820 --> 00:04:16.600
 FP250011.

00:04:16.600 --> 00:04:21.040
 Good afternoon, Julie.

00:04:21.040 --> 00:04:23.640
 - Good afternoon, Julie Wyatt, Principal Planner.

00:04:23.640 --> 00:04:24.700
 Let me see if I can.

00:04:24.700 --> 00:04:30.960
 I guess that's gonna stay.

00:04:30.960 --> 00:04:32.720
 Julie Wyatt, Principal Planner.

00:04:32.720 --> 00:04:37.400
 I'm presenting FP2511, this is Villages on McKinney.

00:04:37.400 --> 00:04:42.400
 It is a final plot for 113-0 lot line,

00:04:42.400 --> 00:04:46.080
 single-family residential dwellings.

00:04:46.080 --> 00:04:47.640
 Some of you may remember this.

00:04:47.640 --> 00:04:51.200
 It was a plan development that went forward with zoning

00:04:51.200 --> 00:04:52.560
 recently.

00:04:52.560 --> 00:04:55.480
 They do have a few items that they need to work through,

00:04:55.480 --> 00:04:58.840
 quite a few review comments that they still have to address.

00:04:58.840 --> 00:05:01.640
 So staff is recommending denial at this time.

00:05:01.640 --> 00:05:06.640
 However, we have no objection to their requested extension,

00:05:06.640 --> 00:05:10.960
 and it is the first extension that they requested.

00:05:10.960 --> 00:05:12.260
 Should I go ahead and answer?

00:05:12.260 --> 00:05:13.100
 Yes.

00:05:14.880 --> 00:05:18.160
 - You know, we're working toward getting to that April 9th.

00:05:18.160 --> 00:05:20.720
 They may not be able to address all of those comments

00:05:20.720 --> 00:05:23.640
 by then, but that's certainly a goal that we have.

00:05:23.640 --> 00:05:26.800
 - And I think on this one in particular,

00:05:26.800 --> 00:05:31.800
 there were some additional utility access things

00:05:31.800 --> 00:05:33.240
 that make it a little bit more complex

00:05:33.240 --> 00:05:34.480
 than your average plat, is that--

00:05:34.480 --> 00:05:37.720
 - It is a complicated site as well as plat,

00:05:37.720 --> 00:05:40.320
 so that was one of the reasons for the PD

00:05:40.320 --> 00:05:42.360
 is just the complexity of the site.

00:05:42.360 --> 00:05:44.600
 - Okay, thank you.

00:05:44.600 --> 00:05:45.920
 - Thank you.

00:05:45.920 --> 00:05:48.120
 - Now we are at 4E, FP25.

00:05:48.120 --> 00:05:49.560
 - Can I just interrupt--

00:05:49.560 --> 00:05:51.440
 - Yes, please do, sorry.

00:05:51.440 --> 00:05:54.640
 - So when we're seeing all of these come through

00:05:54.640 --> 00:05:58.520
 and staff is requesting to deny it

00:05:58.520 --> 00:06:00.380
 and that they want the extension,

00:06:00.380 --> 00:06:02.400
 is it just because there's things in place

00:06:02.400 --> 00:06:06.920
 that they haven't finished and we're on a deadline

00:06:06.920 --> 00:06:09.120
 of having to meet some of the requirements,

00:06:09.120 --> 00:06:10.640
 you know, the timelines?

00:06:10.640 --> 00:06:14.160
 - Right, so state law requires us to take action on plat

00:06:14.160 --> 00:06:16.000
 within 30 days, so we either approve them,

00:06:16.000 --> 00:06:19.760
 deny them or approve with conditions

00:06:19.760 --> 00:06:21.640
 could be an option as well.

00:06:21.640 --> 00:06:24.920
 Because of the state obligation to take action,

00:06:24.920 --> 00:06:27.000
 when applicants are not ready

00:06:27.000 --> 00:06:28.640
 to have the final plat approved,

00:06:28.640 --> 00:06:30.240
 keep in mind it's typically synced up

00:06:30.240 --> 00:06:32.480
 also with their civil engineering plans.

00:06:32.480 --> 00:06:34.620
 And so since the state statute allows

00:06:34.620 --> 00:06:38.280
 for essentially unlimited extensions for the applicants,

00:06:38.280 --> 00:06:39.580
 hence why we try to work with them.

00:06:39.580 --> 00:06:42.700
 So it's not uncommon for us to have final plats

00:06:42.700 --> 00:06:44.980
 where they're on that first extension.

00:06:44.980 --> 00:06:46.880
 Most projects usually are able

00:06:46.880 --> 00:06:50.040
 to get their civil engineering plans

00:06:50.040 --> 00:06:53.600
 and their plat wrapped up within that extension timeframe.

00:06:53.600 --> 00:06:55.660
 We have had a handful of projects from time to time

00:06:55.660 --> 00:06:57.720
 that might need a second extension,

00:06:57.720 --> 00:06:59.480
 but what you're saying is not uncommon.

00:06:59.480 --> 00:07:03.200
 - So when I see these extensions,

00:07:03.200 --> 00:07:05.560
 like if we're seeing multiple extensions,

00:07:05.560 --> 00:07:08.680
 then that's like a red flag or not necessarily?

00:07:08.680 --> 00:07:10.720
 - It's not necessarily a red flag.

00:07:10.720 --> 00:07:13.480
 Each site is unique many times

00:07:13.480 --> 00:07:16.640
 and so has unique challenges that have to be worked through.

00:07:16.640 --> 00:07:18.520
 And so a lot of times it's the applicant

00:07:18.520 --> 00:07:20.360
 trying to work with our team

00:07:20.360 --> 00:07:22.840
 on getting resolution of the staff comments

00:07:22.840 --> 00:07:24.320
 because the final plat is linked

00:07:24.320 --> 00:07:26.720
 to the civil engineering plans.

00:07:26.720 --> 00:07:29.040
 Quality engineering doesn't always happen in 60 days.

00:07:29.040 --> 00:07:32.600
 And so hence the extension requests that are provided for.

00:07:32.600 --> 00:07:35.960
 So our goal is to get them to get their projects

00:07:35.960 --> 00:07:37.680
 to compliance so they meet all their standards.

00:07:37.680 --> 00:07:39.640
 So if that means they've got to get an extension

00:07:39.640 --> 00:07:42.120
 on their plat, we don't see any harm in that.

00:07:42.120 --> 00:07:46.000
 - Okay, I just noticed a lot of the recommendation

00:07:46.000 --> 00:07:47.340
 to deny and extend.

00:07:47.340 --> 00:07:49.640
 So I just wanted to make sure I had a clear understanding.

00:07:49.640 --> 00:07:51.040
 - Absolutely. - Thank you.

00:07:51.040 --> 00:07:57.160
 - Yeah, I'll just add to that from a lay perspective.

00:07:57.160 --> 00:08:01.240
 That state requirement came in with what we refer to

00:08:01.240 --> 00:08:04.720
 as the shot clock for plat applications,

00:08:04.720 --> 00:08:08.060
 partially as a result of many jurisdictions,

00:08:08.060 --> 00:08:11.660
 either because of capacity or because of desire,

00:08:11.660 --> 00:08:15.560
 taking a very long time to take action on plats.

00:08:15.560 --> 00:08:19.640
 Denton, even before that state law requirement was in place,

00:08:19.640 --> 00:08:22.480
 was fairly expedient on these applications,

00:08:22.480 --> 00:08:27.000
 but the language and how they're presented in the agenda

00:08:27.000 --> 00:08:28.720
 is a function of that state law.

00:08:28.720 --> 00:08:36.760
 Okay, now we will, for EFP250008, welcome.

00:08:38.060 --> 00:08:38.900
 Matt.

00:08:38.900 --> 00:08:43.880
 - There we go.

00:08:43.880 --> 00:08:51.160
 All right, so this is FP250008.

00:08:51.160 --> 00:08:55.840
 This is a final plat for a multifamily dwelling site

00:08:55.840 --> 00:09:00.840
 with a Bay Zoning MN for a 0.265 acre site

00:09:00.840 --> 00:09:03.880
 on the west side of Bryan Street,

00:09:03.880 --> 00:09:06.640
 about 340 feet south of Scripture Street

00:09:06.640 --> 00:09:07.960
 here in the city of Denton.

00:09:07.960 --> 00:09:11.960
 Staff is recommending denial of this final plat,

00:09:11.960 --> 00:09:16.520
 as it does not comply with the criteria for approval.

00:09:16.520 --> 00:09:19.560
 This is the first extension of request

00:09:19.560 --> 00:09:22.360
 the staff has no objection to.

00:09:22.360 --> 00:09:24.040
 Remaining comments are fairly minor,

00:09:24.040 --> 00:09:26.740
 so we do believe that they'll be able to achieve those

00:09:26.740 --> 00:09:30.160
 within this extension review period.

00:09:30.160 --> 00:09:31.960
 We're here to answer any questions.

00:09:31.960 --> 00:09:36.600
 - Seeing none, thank you, Matt.

00:09:36.600 --> 00:09:41.600
 And finally, item 4G, also for Matt, FP25006.

00:09:41.600 --> 00:09:43.200
 - Yes.

00:09:43.200 --> 00:09:49.280
 All right, so this one is closely related to,

00:09:49.280 --> 00:09:51.520
 this one goes along with item 4F,

00:09:51.520 --> 00:09:54.960
 which is a subdivision variance request,

00:09:54.960 --> 00:09:59.320
 which I'll explain more when we go over that one.

00:09:59.320 --> 00:10:03.640
 But this is a final plat in the city of Denton's ETJ.

00:10:03.640 --> 00:10:08.640
 It's about a 9.64 acre site located on a private road

00:10:08.640 --> 00:10:13.880
 about 1,500 feet east of FM 2064, or North Locust Street,

00:10:13.880 --> 00:10:17.340
 and approximately 5,500 feet north of Loop 288.

00:10:17.340 --> 00:10:22.040
 Staff's recommendation depends on

00:10:22.040 --> 00:10:24.880
 how this plan zoning commission rules

00:10:24.880 --> 00:10:27.560
 based on that subdivision variance.

00:10:27.560 --> 00:10:31.200
 If the commission approves said variance,

00:10:31.200 --> 00:10:34.360
 staff recommends approval of this final plat.

00:10:34.360 --> 00:10:36.480
 If the commission decides to deny

00:10:36.480 --> 00:10:37.760
 said subdivision variance,

00:10:37.760 --> 00:10:40.500
 staff then recommends denial of the plat.

00:10:40.500 --> 00:10:44.040
 - Thanks, Matt.

00:10:44.040 --> 00:10:48.460
 I think we understand that.

00:10:48.460 --> 00:10:53.720
 Quick question, I know we'll get to the variance in a minute,

00:10:53.720 --> 00:10:54.720
 but I wanted to call this first,

00:10:54.720 --> 00:10:57.040
 because the language is a little bit different

00:10:57.040 --> 00:11:00.020
 from the denial in that,

00:11:01.360 --> 00:11:05.200
 it, I guess my question would be,

00:11:05.200 --> 00:11:07.240
 if the variance is denied,

00:11:07.240 --> 00:11:12.240
 then is there a length of reapplication

00:11:12.240 --> 00:11:15.480
 that would become troublesome for the applicant

00:11:15.480 --> 00:11:18.580
 based on the plat timing?

00:11:18.580 --> 00:11:22.680
 Because typically they'll repeal it

00:11:22.680 --> 00:11:27.480
 so that they can reapply before that time expires

00:11:27.480 --> 00:11:30.640
 of being able to submit a new plat application or something.

00:11:30.640 --> 00:11:33.120
 Am I confusing everybody?

00:11:33.120 --> 00:11:34.560
 I'm sorry.

00:11:34.560 --> 00:11:37.780
 - So if I understand correctly,

00:11:37.780 --> 00:11:43.520
 you are able to resubmit denied plat after a certain time.

00:11:43.520 --> 00:11:46.800
 I don't know that time off the top of my head.

00:11:46.800 --> 00:11:52.280
 It would be, and I still get this in the variance,

00:11:52.280 --> 00:11:54.160
 it would be difficult, I would say,

00:11:54.160 --> 00:11:59.160
 for them to reach approval if we did not approve it.

00:12:01.200 --> 00:12:03.400
 - Okay, so it may be a non-issue then.

00:12:03.400 --> 00:12:05.640
 Okay, so sorry for jumping ahead,

00:12:05.640 --> 00:12:10.640
 but now we can go to item F, four F, the variance.

00:12:10.640 --> 00:12:13.420
 Sorry, go ahead.

00:12:13.420 --> 00:12:14.520
 - While he's pulling that out,

00:12:14.520 --> 00:12:16.960
 so if the plat were denied,

00:12:16.960 --> 00:12:18.400
 the applicant does have the ability

00:12:18.400 --> 00:12:21.040
 to resubmit a plat application.

00:12:21.040 --> 00:12:22.760
 Plats are not like zoning

00:12:22.760 --> 00:12:25.200
 where we have a minimum time period

00:12:25.200 --> 00:12:27.840
 for resubmission of applications.

00:12:27.840 --> 00:12:29.840
 So if they're wanting to resubmit

00:12:29.840 --> 00:12:31.160
 and pay the application fee,

00:12:31.160 --> 00:12:33.240
 then we'll process the plat once again.

00:12:33.240 --> 00:12:38.240
 So I'll let Matt be able to do his presentation

00:12:38.240 --> 00:12:39.760
 on the variance and then,

00:12:39.760 --> 00:12:41.680
 depending upon how the discussion goes,

00:12:41.680 --> 00:12:44.640
 we can circle back on any plat questions if you have.

00:12:44.640 --> 00:12:45.480
 - Thank you.

00:12:45.480 --> 00:12:46.680
 No, I appreciate that.

00:12:46.680 --> 00:12:48.560
 It's hard to keep all the timelines in my head.

00:12:48.560 --> 00:12:49.660
 (laughing)

00:12:49.660 --> 00:12:51.760
 - Yes, lots of different timelines.

00:12:51.760 --> 00:12:54.320
 (laughing)

00:12:54.320 --> 00:12:57.360
 Yes, so this is a subdivision variance,

00:12:57.360 --> 00:12:59.200
 and since we have a few new commissioners

00:12:59.200 --> 00:13:02.560
 I wanted to just briefly talk about what that is.

00:13:02.560 --> 00:13:05.200
 So we try our best as staff to,

00:13:05.200 --> 00:13:06.440
 when working with applicants,

00:13:06.440 --> 00:13:09.520
 to get them to comply with their development standards.

00:13:09.520 --> 00:13:12.240
 And in a few cases, that's not possible,

00:13:12.240 --> 00:13:13.880
 so they seek a variance.

00:13:13.880 --> 00:13:16.040
 Most of these variances do go through

00:13:16.040 --> 00:13:17.600
 the Zoning Board of Adjustments,

00:13:17.600 --> 00:13:19.600
 but when an applicant wants to vary

00:13:19.600 --> 00:13:21.840
 from our subdivision standards,

00:13:21.840 --> 00:13:24.360
 such as lot planning or lot access,

00:13:24.360 --> 00:13:27.120
 it is this body, the Planning and Zoning Commission,

00:13:27.120 --> 00:13:30.480
 that reviews those variance requests.

00:13:30.480 --> 00:13:32.440
 There are certain criteria

00:13:32.440 --> 00:13:35.100
 that they would have to meet for approval,

00:13:35.100 --> 00:13:38.480
 and I'll get into, I'll go over each one specifically

00:13:38.480 --> 00:13:40.720
 and staff's assessment about those

00:13:40.720 --> 00:13:43.320
 in the overall presentation.

00:13:43.320 --> 00:13:45.200
 But to summarize right now,

00:13:45.200 --> 00:13:48.600
 as mentioned earlier, this is for a plat

00:13:48.600 --> 00:13:50.900
 in the city of Denton, ETJ1,

00:13:50.900 --> 00:13:52.860
 more on the north side of the city,

00:13:53.800 --> 00:13:58.800
 off of FM2164 and north of Loop 288.

00:13:58.800 --> 00:14:02.960
 The plat's purpose is to subdivide

00:14:02.960 --> 00:14:06.560
 that nine-acre track into three lots.

00:14:06.560 --> 00:14:09.080
 Their variance request is to allow

00:14:09.080 --> 00:14:11.120
 more than three residential lots

00:14:11.120 --> 00:14:14.080
 to use a private drive for access.

00:14:14.080 --> 00:14:17.900
 Current requirements limit only three residential lots.

00:14:17.900 --> 00:14:22.000
 Three single-family or town-owned residential lots

00:14:22.000 --> 00:14:25.840
 to use a private access for access to a public street.

00:14:25.840 --> 00:14:27.600
 So they are seeking a variance from that

00:14:27.600 --> 00:14:29.440
 to allow more than said three.

00:14:29.440 --> 00:14:32.840
 Staff is recommending, ultimately,

00:14:32.840 --> 00:14:34.080
 approval of this variance.

00:14:34.080 --> 00:14:36.440
 Some of the considerations that went

00:14:36.440 --> 00:14:41.000
 into that recommendation is that the existing,

00:14:41.000 --> 00:14:44.440
 the peculiar pattern of development

00:14:44.440 --> 00:14:46.840
 in this area has created a situation

00:14:46.840 --> 00:14:49.520
 in which there are more than three,

00:14:49.520 --> 00:14:52.760
 there's seven properties that take access,

00:14:52.760 --> 00:14:55.720
 exclusive access to a public street

00:14:55.720 --> 00:14:58.020
 via this existing access easement.

00:14:58.020 --> 00:15:02.960
 And that at least four of the,

00:15:02.960 --> 00:15:06.760
 at least five of these lots, including the lot in question,

00:15:06.760 --> 00:15:10.100
 have existing single-family residents on them.

00:15:10.100 --> 00:15:12.400
 And so it would be very difficult

00:15:12.400 --> 00:15:14.400
 and it would create a hardship on the owner

00:15:14.400 --> 00:15:19.280
 of this particular tract to subdivide,

00:15:19.280 --> 00:15:22.320
 to plot and then subsequently develop

00:15:22.320 --> 00:15:26.780
 in a manner that's compliant with our development code.

00:15:26.780 --> 00:15:30.680
 And these conditions have been in place

00:15:30.680 --> 00:15:35.680
 since prior to this, to our code restriction being in place.

00:15:35.680 --> 00:15:42.320
 I'll go a little more detail in the main presentation,

00:15:42.320 --> 00:15:44.280
 but if there's any questions or if you want me

00:15:44.280 --> 00:15:47.400
 to go over anything now, happy to do so.

00:15:50.160 --> 00:15:52.560
 - Commissioner Carrillo, Prado Korea.

00:15:52.560 --> 00:15:56.520
 - So can you just give me some background

00:15:56.520 --> 00:15:59.640
 as to why it was set like this,

00:15:59.640 --> 00:16:01.900
 that it would only be three or less?

00:16:01.900 --> 00:16:08.080
 - So in the DDC, let's see.

00:16:08.080 --> 00:16:12.240
 So this comes from sub-chapter eight,

00:16:12.240 --> 00:16:14.800
 which is about our subdivision regulations

00:16:14.800 --> 00:16:17.060
 is where that requirement is coming from,

00:16:18.000 --> 00:16:22.080
 which says, up to three single-family detached

00:16:22.080 --> 00:16:24.840
 dwelling units may access a public means

00:16:24.840 --> 00:16:29.480
 by use of a flag drive or within a private access easement.

00:16:29.480 --> 00:16:33.320
 And so those plotting or subdivision requirements

00:16:33.320 --> 00:16:37.280
 do apply in the ETJ and would thus apply to this plat.

00:16:37.280 --> 00:16:44.520
 Those were adopted with the current development code,

00:16:44.520 --> 00:16:46.420
 which was passed in 2019.

00:16:48.360 --> 00:16:52.720
 Which, and this particular track and these properties

00:16:52.720 --> 00:16:57.720
 and this area has developed with more than three lots

00:16:57.720 --> 00:17:03.280
 off of the single access drive prior to 2019.

00:17:03.280 --> 00:17:05.120
 Does that help answer your question?

00:17:05.120 --> 00:17:06.240
 - No, yeah, I understand that.

00:17:06.240 --> 00:17:08.120
 I was just wondering, like, is there,

00:17:08.120 --> 00:17:10.960
 I know you're saying that staff is pro-living

00:17:10.960 --> 00:17:14.280
 towards having this approved, the variance approved,

00:17:14.280 --> 00:17:18.080
 but my question was, why was it set to three?

00:17:18.080 --> 00:17:21.520
 Is there a downfall to it in the case of an emergency

00:17:21.520 --> 00:17:23.640
 for emergency vehicles?

00:17:23.640 --> 00:17:26.980
 Like what's the, why was it decided that three

00:17:26.980 --> 00:17:28.960
 would be the magic number in the first place?

00:17:28.960 --> 00:17:30.480
 - Gotcha, gotcha.

00:17:30.480 --> 00:17:32.600
 Yes, I think Tina will help answer.

00:17:32.600 --> 00:17:34.560
 - So that is a great question.

00:17:34.560 --> 00:17:36.920
 I think probably the only person who probably was here

00:17:36.920 --> 00:17:39.600
 when we adopted the code was Julie,

00:17:39.600 --> 00:17:41.360
 and I'm gonna look to you for a moment.

00:17:41.360 --> 00:17:44.000
 Did this provision exist in the 02 code?

00:17:44.000 --> 00:17:49.000
 Okay, so typically when we provide a limitation

00:17:49.000 --> 00:17:52.480
 like this with three, ideally it's probably the goal

00:17:52.480 --> 00:17:55.080
 at the time or when the codes were written

00:17:55.080 --> 00:17:59.260
 was to have some reasonable number of lots

00:17:59.260 --> 00:18:02.680
 that could take access off of the private street.

00:18:02.680 --> 00:18:05.400
 Sometimes codes don't even have this allowance for them.

00:18:05.400 --> 00:18:07.320
 It just assumes that everybody gets access

00:18:07.320 --> 00:18:08.800
 off of a public street.

00:18:08.800 --> 00:18:11.580
 So we have this allowance.

00:18:11.580 --> 00:18:14.800
 You know, we look for a reasonable means of access.

00:18:14.800 --> 00:18:17.400
 We have this variance provision to allow

00:18:17.400 --> 00:18:19.920
 for consideration of more than three

00:18:19.920 --> 00:18:24.000
 so that we can evaluate existing conditions.

00:18:24.000 --> 00:18:26.360
 Is there something unique associated with it?

00:18:26.360 --> 00:18:28.740
 In this case, there was multiple structures

00:18:28.740 --> 00:18:30.740
 that had already been built in existence

00:18:30.740 --> 00:18:32.520
 because it's out in the county

00:18:32.520 --> 00:18:34.360
 and we don't regulate land use out in the county.

00:18:34.360 --> 00:18:38.720
 So hence why we've got this variance process in place

00:18:38.720 --> 00:18:40.000
 to be able to take into consideration

00:18:40.000 --> 00:18:41.920
 those existing conditions to see whether or not

00:18:41.920 --> 00:18:43.960
 it warrants deviation from it.

00:18:43.960 --> 00:18:45.760
 We typically coordinate with the county

00:18:45.760 --> 00:18:49.660
 and I believe they're fire marshal on the review

00:18:49.660 --> 00:18:51.600
 to make sure that they have no issues with it

00:18:51.600 --> 00:18:53.880
 either since it is dealing with access to properties.

00:18:53.880 --> 00:18:58.880
 So probably, I don't know the full magic answer behind three

00:18:58.880 --> 00:19:01.280
 but I would suspect that those were the considerations

00:19:01.280 --> 00:19:06.040
 that were taken into, or that were, yeah,

00:19:06.040 --> 00:19:09.800
 taken into consideration when that provision was established.

00:19:09.800 --> 00:19:13.680
 - Okay, but being that it's 9.64 acres,

00:19:13.680 --> 00:19:16.960
 I mean, there's ample space that there's not a concern

00:19:16.960 --> 00:19:20.040
 if we were to allow for the variance then, right?

00:19:20.040 --> 00:19:21.760
 - Correct. - Okay.

00:19:21.760 --> 00:19:23.200
 - Yeah, if we had any concerns

00:19:23.200 --> 00:19:25.020
 regarding the variance being requested,

00:19:25.020 --> 00:19:26.680
 then our recommendation would be different.

00:19:26.680 --> 00:19:28.960
 - Okay, perfect, thank you.

00:19:28.960 --> 00:19:31.320
 - Yeah, and to confirm Tina's point,

00:19:31.320 --> 00:19:33.960
 we did reach out to Denton County staff regarding this

00:19:33.960 --> 00:19:37.040
 and their reviewer for fire safety

00:19:37.040 --> 00:19:40.880
 did not have any issues with the proposed plat

00:19:40.880 --> 00:19:42.720
 in this variance.

00:19:42.720 --> 00:19:43.560
 - Thank you.

00:19:43.560 --> 00:19:46.480
 - Commissioner Dive.

00:19:46.480 --> 00:19:50.040
 - Okay, so the plat shows that this nine acres

00:19:50.040 --> 00:19:51.960
 is gonna be divided into three,

00:19:51.960 --> 00:19:53.920
 almost three acre parcels.

00:19:53.920 --> 00:19:54.760
 - Correct. - Correct.

00:19:54.760 --> 00:19:57.280
 And you talked about there's preexisting buildings.

00:19:57.280 --> 00:19:59.720
 Are they homes or just?

00:19:59.720 --> 00:20:02.440
 - Yes, yeah, so they are.

00:20:04.440 --> 00:20:09.080
 - And are they located one on each lot, proposed lot,

00:20:09.080 --> 00:20:11.680
 or are they all located on one of the lots?

00:20:11.680 --> 00:20:14.080
 Is she wanting to build on the others?

00:20:14.080 --> 00:20:18.360
 - So the applicant, she did provide this graphic for us

00:20:18.360 --> 00:20:20.120
 that kind of illustrates her point.

00:20:20.120 --> 00:20:25.440
 In blue is showing their proposed lot boundaries

00:20:25.440 --> 00:20:28.120
 over a Google satellite image.

00:20:28.120 --> 00:20:31.940
 And so the main structures,

00:20:31.940 --> 00:20:34.920
 there's a house here on lot three,

00:20:34.920 --> 00:20:36.200
 a house here on lot two,

00:20:36.200 --> 00:20:41.020
 and then they're proposing to move this residential house

00:20:41.020 --> 00:20:46.020
 onto lot one, as it would right now across the lot boundary

00:20:46.020 --> 00:20:48.360
 that's on them.

00:20:48.360 --> 00:20:51.900
 That is what they're proposing to do.

00:20:51.900 --> 00:20:56.120
 - Is this affecting, I mean, I know that there's one

00:20:56.120 --> 00:20:58.360
 named person, but is this like a family,

00:20:58.360 --> 00:20:59.680
 like a generational family

00:20:59.680 --> 00:21:02.400
 where they're all on the same property?

00:21:02.400 --> 00:21:05.560
 - She did not specify that.

00:21:05.560 --> 00:21:08.640
 All that was said regarding that is that these are,

00:21:08.640 --> 00:21:10.560
 I guess, single family residences.

00:21:10.560 --> 00:21:13.280
 - That would be a question that you could ask

00:21:13.280 --> 00:21:16.280
 of the applicant, if you wish.

00:21:16.280 --> 00:21:20.360
 Just remember also, since the property is out in the county,

00:21:20.360 --> 00:21:22.080
 we cannot regulate land use.

00:21:22.080 --> 00:21:24.400
 So if even she was wanting to,

00:21:24.400 --> 00:21:25.820
 or if the property owner was wanting to use it

00:21:25.820 --> 00:21:27.080
 for different purposes,

00:21:28.240 --> 00:21:30.920
 our review is limited to the proposed land subdivision,

00:21:30.920 --> 00:21:33.280
 making sure it has appropriate access,

00:21:33.280 --> 00:21:36.360
 and then also extension of service for utilities.

00:21:36.360 --> 00:21:37.900
 - Okay, thank you.

00:21:37.900 --> 00:21:43.460
 - I just have one quick one.

00:21:43.460 --> 00:21:47.480
 You mentioned that the county fire marshal reviewed.

00:21:47.480 --> 00:21:52.920
 Is this area serviced by the county or serviced by the city?

00:21:52.920 --> 00:21:57.560
 Or is it just sort of whoever can respond sooner

00:21:57.560 --> 00:21:59.440
 when the call comes in?

00:21:59.440 --> 00:22:00.680
 - I'll let Tina.

00:22:00.680 --> 00:22:03.360
 - So great questions.

00:22:03.360 --> 00:22:04.920
 So typically, it's my understanding

00:22:04.920 --> 00:22:07.640
 the county fire marshal's office would determine

00:22:07.640 --> 00:22:09.320
 which agency would report.

00:22:09.320 --> 00:22:14.320
 So if they have the ability to service this area

00:22:14.320 --> 00:22:17.440
 and be first responders, then they would do so.

00:22:17.440 --> 00:22:20.760
 Otherwise, they can assign it to other municipalities

00:22:20.760 --> 00:22:22.440
 to be part of the response team.

00:22:24.520 --> 00:22:29.320
 It's my understanding in working with our fire chief,

00:22:29.320 --> 00:22:32.000
 as well as others, it's all about many times,

00:22:32.000 --> 00:22:36.720
 it's about when people are in an emergency need

00:22:36.720 --> 00:22:40.940
 and responses needed, whoever's available

00:22:40.940 --> 00:22:42.960
 is the one that is responding.

00:22:42.960 --> 00:22:46.320
 So we do typically have interlocal agreements in place

00:22:46.320 --> 00:22:48.560
 with other communities for response in areas

00:22:48.560 --> 00:22:51.000
 that we cannot serve or where we would be delayed

00:22:51.000 --> 00:22:52.480
 in getting service to.

00:22:52.480 --> 00:22:54.440
 But ultimately, the way I understand it,

00:22:54.440 --> 00:22:56.800
 it's the fire marshal's office at the county

00:22:56.800 --> 00:23:00.560
 who would be the responding entity.

00:23:00.560 --> 00:23:02.780
 - Okay, thank you.

00:23:02.780 --> 00:23:05.300
 Any other questions?

00:23:05.300 --> 00:23:10.000
 Seeing none, we'll look forward to it at the public hearing.

00:23:10.000 --> 00:23:12.880
 I guess also, are there any other questions

00:23:12.880 --> 00:23:16.960
 from a procedural perspective, given the application

00:23:16.960 --> 00:23:19.600
 that comes after this individual consideration item?

00:23:19.600 --> 00:23:23.280
 Okay.

00:23:23.280 --> 00:23:24.680
 All right, thank you, Matt.

00:23:24.680 --> 00:23:34.280
 That brings us to our public hearings.

00:23:34.280 --> 00:23:39.280
 Item 5A is being withdrawn and will be re-noticed,

00:23:39.280 --> 00:23:44.480
 so we will not take action on that item.

00:23:44.480 --> 00:23:49.480
 Item B is S240006.

00:23:49.480 --> 00:23:52.360
 Good afternoon, Erin.

00:23:52.360 --> 00:23:53.400
 - Good afternoon.

00:23:53.400 --> 00:24:03.440
 So this is a specific use permit

00:24:03.440 --> 00:24:05.480
 for national equipment dealers,

00:24:05.480 --> 00:24:07.200
 and I'll just give a brief summary here,

00:24:07.200 --> 00:24:09.680
 and I'll have a longer presentation in the main session,

00:24:09.680 --> 00:24:11.720
 but I'll be happy to answer any questions.

00:24:11.720 --> 00:24:13.960
 This is a request for a specific use permit

00:24:13.960 --> 00:24:16.320
 for equipment sales and rental use

00:24:16.320 --> 00:24:18.360
 to facilitate a national equipment dealer's

00:24:18.360 --> 00:24:19.800
 commercial business.

00:24:19.800 --> 00:24:23.280
 This is an approximately 4.25-acre site

00:24:23.280 --> 00:24:27.120
 just west of North I-35 and east of the terminus

00:24:27.120 --> 00:24:29.160
 of Jim Crystal Road.

00:24:29.160 --> 00:24:32.400
 You can see here, this is Jim Crystal,

00:24:32.400 --> 00:24:36.240
 and it used to cut through, the road didn't cut through,

00:24:36.240 --> 00:24:38.760
 but it was proposed to cut through.

00:24:38.760 --> 00:24:41.480
 This was abandoned in the year 2000,

00:24:41.480 --> 00:24:45.360
 and so the existing, what looks like a road cutting

00:24:45.360 --> 00:24:48.960
 through the property is actually just utility easement today,

00:24:48.960 --> 00:24:52.720
 and so staff is recommending approval of this request,

00:24:52.720 --> 00:24:54.440
 it complies with all of our criteria,

00:24:54.440 --> 00:24:56.600
 and I'll be happy to answer any questions.

00:24:56.600 --> 00:25:01.600
 - Any questions?

00:25:01.600 --> 00:25:06.640
 Seeing none, thank you, Erin.

00:25:06.640 --> 00:25:15.320
 And then I'll let Bryce say a couple things

00:25:15.320 --> 00:25:20.320
 for item 5C for this application.

00:25:20.320 --> 00:25:23.160
 - Good evening, Commission,

00:25:23.160 --> 00:25:25.040
 Bryce Van Arsdale, Assistant Planner.

00:25:25.040 --> 00:25:29.800
 So with item 5C tonight, it was commercial animal services,

00:25:29.800 --> 00:25:34.800
 it's a DCA 2411, I'm happy to pull up the presentation.

00:25:34.800 --> 00:25:38.840
 We are asking that this item is withdrawn

00:25:38.840 --> 00:25:41.400
 from the agenda tonight, as there was a business

00:25:41.400 --> 00:25:44.920
 that has since moved, since our notices were sent out,

00:25:44.920 --> 00:25:47.040
 and this change was not caught with the addressing,

00:25:47.040 --> 00:25:49.040
 thank you, Chair Pruitt.

00:25:49.040 --> 00:25:52.520
 So we will be noticing this address and this property

00:25:52.520 --> 00:25:55.240
 for an additional hearing in the future.

00:25:55.240 --> 00:25:56.800
 So for that reason, we're asking that tonight,

00:25:56.800 --> 00:25:58.800
 this item is withdrawn from the agenda.

00:25:58.800 --> 00:26:02.760
 - Any questions, sir?

00:26:02.760 --> 00:26:05.480
 Okay, thank you, Bryce.

00:26:05.480 --> 00:26:06.320
 - Thank you.

00:26:10.640 --> 00:26:15.640
 And with that, at 529 p.m.,

00:26:15.640 --> 00:26:18.640
 I will bring our, without objection,

00:26:18.640 --> 00:26:20.600
 I will bring our work session to a close.

00:26:20.600 --> 00:26:26.080
 Thank you, we'll see you at 630 in the main auditorium.

00:26:26.080 --> 00:26:35.920
 - Good evening, at 630 p.m. on Wednesday, March 19th,

00:26:35.920 --> 00:26:39.320
 I will call this regular meeting

00:26:39.320 --> 00:26:42.200
 of the Denton Planning and Zoning Commission to order.

00:26:42.200 --> 00:26:44.840
 Our first order of business is the Pledge of Allegiance

00:26:44.840 --> 00:26:46.880
 to the U.S. and Texas flag.

00:26:46.880 --> 00:26:53.080
 - I pledge allegiance to the flag

00:26:53.080 --> 00:26:55.360
 of the United States of America

00:26:55.360 --> 00:26:58.320
 and to the republic for which it stands,

00:26:58.320 --> 00:27:01.880
 one nation, under God, indivisible,

00:27:01.880 --> 00:27:04.080
 with liberty and justice for all.

00:27:07.200 --> 00:27:12.200
 - Under the Texas flag, I pledge allegiance to the Texas,

00:27:12.200 --> 00:27:16.120
 one state, under God, one, and indivisible.

00:27:16.120 --> 00:27:27.600
 - Our next item is item 2A, PZ25005,

00:27:27.600 --> 00:27:30.520
 consider approval of the February 26th

00:27:30.520 --> 00:27:32.960
 planning and zoning meeting minutes.

00:27:32.960 --> 00:27:34.040
 Commissioner Villarreal.

00:27:34.040 --> 00:27:35.440
 - Move approval.

00:27:35.440 --> 00:27:37.920
 - Commissioner Prodokorio.

00:27:37.920 --> 00:27:38.760
 - Second.

00:27:38.760 --> 00:27:43.640
 - Any questions with that, we'll vote on the board.

00:27:43.640 --> 00:27:51.720
 That item passes 4-0.

00:27:51.720 --> 00:27:53.840
 That brings us to our consent agenda.

00:27:53.840 --> 00:27:58.720
 Commissioner Villarreal.

00:27:58.720 --> 00:27:59.560
 - Move approval.

00:27:59.560 --> 00:28:03.080
 - Commissioner Prodokorio.

00:28:03.080 --> 00:28:05.120
 - I second.

00:28:06.160 --> 00:28:08.840
 - Any discussion or questions?

00:28:08.840 --> 00:28:11.360
 With that, I will call for a vote on the board.

00:28:11.360 --> 00:28:18.480
 That item passes 4-0.

00:28:18.480 --> 00:28:22.840
 That brings us to our items for individual consideration.

00:28:22.840 --> 00:28:27.000
 Item 4A, FP250013.

00:28:27.000 --> 00:28:30.080
 - Good evening, commissioners.

00:28:30.080 --> 00:28:31.920
 Cameron Robertson, principal planner.

00:28:36.160 --> 00:28:37.200
 - There we go.

00:28:37.200 --> 00:28:40.640
 This is for a final plot for the landmark edition.

00:28:40.640 --> 00:28:43.680
 It's approximately 20 acres located on the northwest corner

00:28:43.680 --> 00:28:46.960
 of Robeson Ranch Road and I-35 West.

00:28:46.960 --> 00:28:49.520
 Staff is currently recommending denial,

00:28:49.520 --> 00:28:52.560
 but staff has no objection to a first extension request

00:28:52.560 --> 00:28:53.960
 of April 9th.

00:28:53.960 --> 00:28:55.520
 I can stand for any questions.

00:28:55.520 --> 00:28:59.160
 - Any questions?

00:28:59.160 --> 00:29:04.640
 Seeing none, we have a motion.

00:29:05.920 --> 00:29:08.720
 Or, commissioner Dyer.

00:29:08.720 --> 00:29:11.920
 - I make a motion that we approve the extension.

00:29:11.920 --> 00:29:19.400
 - Can you say to a date certain?

00:29:19.400 --> 00:29:20.960
 That's fine. - Oh, to the April 9th.

00:29:20.960 --> 00:29:21.800
 - Yes.

00:29:21.800 --> 00:29:24.720
 And commissioner Prodokorio.

00:29:24.720 --> 00:29:27.320
 - I second that.

00:29:27.320 --> 00:29:28.160
 - Thank you.

00:29:28.160 --> 00:29:31.280
 And I call for a vote on the board.

00:29:36.440 --> 00:29:40.920
 - That item passes 3-1.

00:29:40.920 --> 00:29:47.240
 The next item is 4B, FP250007.

00:29:47.240 --> 00:29:57.960
 - Good evening, chair, members of the commission.

00:29:57.960 --> 00:30:00.040
 Angie Manglaris, development review manager,

00:30:00.040 --> 00:30:03.120
 here to present FP250007.

00:30:03.120 --> 00:30:06.560
 This is a final plot for Elms Bend Multifamily.

00:30:06.560 --> 00:30:09.200
 It is situated at the northeast corner of Audre Lane

00:30:09.200 --> 00:30:11.600
 and Nottingham Drive at this time.

00:30:11.600 --> 00:30:13.040
 There's still some comments to be worked out

00:30:13.040 --> 00:30:15.360
 and staff is recommending denial of this final plot.

00:30:15.360 --> 00:30:18.280
 However, staff has no objection to the extension request

00:30:18.280 --> 00:30:19.840
 to a date certain of April 9th.

00:30:19.840 --> 00:30:22.200
 Happy to answer any questions you all may have.

00:30:22.200 --> 00:30:28.000
 - Any questions or a motion?

00:30:28.000 --> 00:30:32.240
 Commissioner Prodokorio.

00:30:34.080 --> 00:30:38.480
 - I move that we approve the extension to April 9th.

00:30:38.480 --> 00:30:43.160
 - And commissioner Dyer.

00:30:43.160 --> 00:30:46.760
 There's a second.

00:30:46.760 --> 00:30:50.440
 And I will call for a vote on the board.

00:30:50.440 --> 00:30:59.040
 And that item passes 3-1.

00:31:00.520 --> 00:31:04.920
 Next item is item 4C, FP250009.

00:31:04.920 --> 00:31:08.320
 - Good evening, Aaron Stanley, assistant planner.

00:31:08.320 --> 00:31:13.560
 This is FP250009.

00:31:13.560 --> 00:31:18.280
 This is the Hilltop Village addition located in the ETJ,

00:31:18.280 --> 00:31:20.360
 just east of Hilltop Road.

00:31:20.360 --> 00:31:22.640
 At this time, they have a few more comments to work out

00:31:22.640 --> 00:31:24.080
 and staff is recommending denial,

00:31:24.080 --> 00:31:27.240
 but we have no objection to their requested extension

00:31:27.240 --> 00:31:28.080
 to April 9th.

00:31:30.120 --> 00:31:31.000
 - Thank you, Aaron.

00:31:31.000 --> 00:31:33.080
 Any questions or a motion?

00:31:33.080 --> 00:31:38.160
 Commissioner Prodokorio.

00:31:38.160 --> 00:31:42.040
 - So I approve that we accept the extension to April 9th.

00:31:42.040 --> 00:31:45.240
 - And commissioner Dyer.

00:31:45.240 --> 00:31:46.840
 - I'll go ahead and second that.

00:31:46.840 --> 00:31:51.280
 - Seeing no questions, I'll call for a vote on the board.

00:31:58.680 --> 00:32:01.720
 And that item passes 3-1.

00:32:01.720 --> 00:32:04.720
 That brings us to item 4D.

00:32:04.720 --> 00:32:08.880
 Julie.

00:32:08.880 --> 00:32:11.440
 - Good evening, Julie Wyatt, principal planner.

00:32:11.440 --> 00:32:13.680
 This is a final plat for villages on McKinney.

00:32:13.680 --> 00:32:15.400
 It's about a 12 acre site

00:32:15.400 --> 00:32:17.680
 located on the north side of McKinney.

00:32:17.680 --> 00:32:22.680
 The purpose of the final plat is to create 113

00:32:22.680 --> 00:32:25.880
 zero lot line residential lots.

00:32:25.880 --> 00:32:27.880
 They do have some items they do need to work out

00:32:27.880 --> 00:32:30.240
 in order to meet the criteria for approval.

00:32:30.240 --> 00:32:33.240
 However, staff is, so we are recommending denial.

00:32:33.240 --> 00:32:37.520
 However, staff has no objection

00:32:37.520 --> 00:32:41.200
 to the proposed extension to the April 9th P&Z.

00:32:41.200 --> 00:32:43.320
 And I'll be happy to answer any questions.

00:32:43.320 --> 00:32:47.000
 - I have a question.

00:32:47.000 --> 00:32:48.280
 - Commissioner Dyer.

00:32:48.280 --> 00:32:52.880
 - If we vote not to extend the request to April 9th,

00:32:52.880 --> 00:32:55.320
 like what happens to this process?

00:32:57.080 --> 00:33:00.000
 - So there are kind of three options

00:33:00.000 --> 00:33:02.960
 to approve the extension, to deny the plat,

00:33:02.960 --> 00:33:04.920
 or to approve the plat.

00:33:04.920 --> 00:33:09.920
 So as far as options other than.

00:33:09.920 --> 00:33:12.320
 - I mean, if you were to deny the plat,

00:33:12.320 --> 00:33:15.840
 then it's denied and the applicant would have to resubmit.

00:33:15.840 --> 00:33:17.480
 If you're going to make a motion for denial,

00:33:17.480 --> 00:33:20.400
 you need to cite the reasons as such.

00:33:20.400 --> 00:33:21.600
 Since it is a plat, you know,

00:33:21.600 --> 00:33:23.360
 as we discussed in the work session,

00:33:23.360 --> 00:33:25.400
 the state statute does provide opportunities

00:33:25.400 --> 00:33:27.680
 for the extension and we try to work with applicants

00:33:27.680 --> 00:33:30.560
 to get their engineering plans to an approval state,

00:33:30.560 --> 00:33:32.280
 which has an impact on the plat as well.

00:33:32.280 --> 00:33:36.520
 So, but again, if you're going to make a motion for denial

00:33:36.520 --> 00:33:38.080
 on it, I would ask for you to cite the reasons

00:33:38.080 --> 00:33:42.360
 why the plat's not being made a motion for,

00:33:42.360 --> 00:33:46.640
 or make sure you cite the provisions within the code

00:33:46.640 --> 00:33:48.520
 as for the motion for denial.

00:33:48.520 --> 00:33:51.360
 - Sure.

00:33:51.360 --> 00:33:53.960
 And just a little reminder, as Tina said,

00:33:53.960 --> 00:33:58.960
 that specifically for plat, the reason for voting against

00:33:58.960 --> 00:34:03.240
 needs to be related to one of the subdivision regulations

00:34:03.240 --> 00:34:04.560
 that was not met.

00:34:04.560 --> 00:34:06.600
 There's less discretion with plat

00:34:06.600 --> 00:34:10.640
 than there are with zoning entitlement decisions.

00:34:10.640 --> 00:34:17.120
 - And just a question for legal.

00:34:20.440 --> 00:34:24.600
 Our procedures provide for essentially,

00:34:24.600 --> 00:34:29.600
 in a case of a tie vote, the item is considered again

00:34:29.600 --> 00:34:33.760
 at the next meeting.

00:34:33.760 --> 00:34:38.160
 How does that interact with the shot clock request?

00:34:38.160 --> 00:34:39.640
 - That's a great question.

00:34:39.640 --> 00:34:41.360
 Tina looks like she might have an answer.

00:34:41.360 --> 00:34:43.320
 I'm gonna verify something real quick.

00:34:43.320 --> 00:34:45.000
 - I was gonna say, if you could please verify,

00:34:45.000 --> 00:34:49.360
 but with the result of the, if a plat had a tie vote,

00:34:49.360 --> 00:34:54.360
 then I believe it by default then is considered not approved.

00:34:54.360 --> 00:34:55.880
 So then it's denied.

00:34:55.880 --> 00:34:59.080
 I would caution us on that for the reasons

00:34:59.080 --> 00:35:01.000
 that Hillary had just cited,

00:35:01.000 --> 00:35:03.240
 particularly with respect to, you know, again,

00:35:03.240 --> 00:35:04.560
 we're trying to get these,

00:35:04.560 --> 00:35:08.400
 we have less subjective abilities with regarding plat,

00:35:08.400 --> 00:35:10.080
 like you do on zoning, for example.

00:35:10.080 --> 00:35:14.800
 So the plat, you know, it either meets all the requirements

00:35:14.800 --> 00:35:15.680
 or it doesn't.

00:35:15.680 --> 00:35:17.240
 Again, we try to work with the applicants

00:35:17.240 --> 00:35:20.400
 to get their plat along with their civil engineering plans

00:35:20.400 --> 00:35:24.240
 in a position of approval-ness.

00:35:24.240 --> 00:35:25.280
 I think I said earlier, you know,

00:35:25.280 --> 00:35:27.400
 quality engineering can't happen in 60 days.

00:35:27.400 --> 00:35:29.200
 My apologies, I should have said 30 days

00:35:29.200 --> 00:35:31.520
 because the 30 day provision is what's provided

00:35:31.520 --> 00:35:32.960
 for in the state statute.

00:35:32.960 --> 00:35:35.360
 But we wanna make sure our projects are designed properly

00:35:35.360 --> 00:35:36.560
 in accordance with our standards.

00:35:36.560 --> 00:35:39.560
 So hence why staff typically supports the extension request.

00:35:39.560 --> 00:35:44.600
 - Any other questions?

00:35:44.600 --> 00:35:46.320
 No?

00:35:46.320 --> 00:35:47.360
 Okay.

00:35:47.360 --> 00:35:48.200
 Commissioner Dyer.

00:35:48.200 --> 00:35:51.680
 - I would like to make a motion to go ahead

00:35:51.680 --> 00:35:53.600
 and extend to the April 9th meeting.

00:35:53.600 --> 00:35:54.440
 - Okay.

00:35:54.440 --> 00:35:56.200
 Commissioner Prover-Carrillo.

00:35:56.200 --> 00:35:57.560
 - I'll second that motion.

00:35:57.560 --> 00:36:00.120
 - Seeing no other questions,

00:36:00.120 --> 00:36:02.280
 I'll call for a vote on the board.

00:36:02.280 --> 00:36:08.720
 And that item passes three, one.

00:36:08.720 --> 00:36:15.960
 That brings us to item four E,

00:36:15.960 --> 00:36:18.360
 FP250008.

00:36:18.360 --> 00:36:28.040
 - Good evening, Commissioner Matt Bodine,

00:36:28.040 --> 00:36:28.960
 Assistant Planner.

00:36:28.960 --> 00:36:33.960
 Here to present a final plat for a .265 acre site

00:36:33.960 --> 00:36:39.360
 on Bryan Street, about 340 feet south of Scripture Street

00:36:39.360 --> 00:36:41.280
 in the city of Denton.

00:36:41.280 --> 00:36:44.640
 At this time, this plat does not meet the criteria

00:36:44.640 --> 00:36:47.200
 for approvals, so we cannot recommend approval.

00:36:47.200 --> 00:36:50.360
 But we have no objection to the request extension

00:36:50.360 --> 00:36:51.960
 to a date certain of April 9th.

00:36:51.960 --> 00:36:55.800
 - Thank you, Matt.

00:36:55.800 --> 00:36:58.680
 Any questions or a motion?

00:36:58.680 --> 00:37:00.240
 Commissioner Prover-Carrillo.

00:37:00.240 --> 00:37:04.200
 - I motion that we approve the extension until April 9th.

00:37:04.200 --> 00:37:05.080
 - Commissioner Dyer.

00:37:05.080 --> 00:37:07.040
 - I will second that.

00:37:07.040 --> 00:37:08.640
 - And seeing no other questions,

00:37:08.640 --> 00:37:10.400
 I'll call for a vote on the board.

00:37:15.480 --> 00:37:19.360
 And that item passes three, one.

00:37:19.360 --> 00:37:24.360
 That brings us to item four FV2500029.

00:37:24.360 --> 00:37:36.560
 - Matt Bodine, Assistant Planner.

00:37:36.560 --> 00:37:39.360
 Here to present a subdivision variance

00:37:39.360 --> 00:37:44.360
 for a final plat FB250006.

00:37:44.680 --> 00:37:46.760
 Which is on today's meeting agenda.

00:37:46.760 --> 00:37:50.240
 So just a reminder.

00:37:50.240 --> 00:37:54.520
 This plat is located in the ETJ1 of the city of Denton.

00:37:54.520 --> 00:37:58.480
 So in the county, in an area where we have

00:37:58.480 --> 00:38:01.360
 planning authority, but any sort of zoning

00:38:01.360 --> 00:38:05.000
 and building permitting is through the county.

00:38:05.000 --> 00:38:10.000
 It's about 5500 feet north of loop 288 on a private road.

00:38:10.000 --> 00:38:14.040
 The tract itself is about nine acre tract.

00:38:14.040 --> 00:38:15.840
 With access to a public street

00:38:15.840 --> 00:38:19.320
 through an existing private access easement.

00:38:19.320 --> 00:38:22.560
 With existing single family residents on it.

00:38:22.560 --> 00:38:26.300
 And the plat is proposing to subdivide into three lots.

00:38:26.300 --> 00:38:31.060
 They are requesting a variance from our lot planning

00:38:31.060 --> 00:38:33.560
 subdivision regulations.

00:38:33.560 --> 00:38:36.600
 Specifically to allow more than three residential lots

00:38:36.600 --> 00:38:38.520
 to access a public street by means

00:38:38.520 --> 00:38:40.440
 of a private access easement.

00:38:41.600 --> 00:38:44.680
 In the consideration, staff found it to be true

00:38:44.680 --> 00:38:47.360
 that granting this variance would not be detrimental

00:38:47.360 --> 00:38:51.000
 to the public safety, health or welfare.

00:38:51.000 --> 00:38:53.560
 Nor would it be injurious to other property owners.

00:38:53.560 --> 00:38:59.080
 Due to Denton County Fire Marshal having no issues

00:38:59.080 --> 00:39:01.840
 and there being no expected increase in traffic.

00:39:01.840 --> 00:39:06.960
 Regarding the consideration of the physical surroundings

00:39:06.960 --> 00:39:09.560
 or conditions of the specific property.

00:39:09.560 --> 00:39:13.280
 Staff did find that the peculiar pattern of development

00:39:13.280 --> 00:39:15.720
 in this area creates a hardship.

00:39:15.720 --> 00:39:18.920
 There are already over, there are seven properties

00:39:18.920 --> 00:39:21.620
 that take access from this private easement.

00:39:21.620 --> 00:39:25.280
 At least five of them have known residential buildings

00:39:25.280 --> 00:39:28.320
 on them and would be considered residential lots.

00:39:28.320 --> 00:39:30.920
 And so whether the property decide to apply as one,

00:39:30.920 --> 00:39:34.840
 three or 10, it would require a variance before you

00:39:34.840 --> 00:39:37.720
 based on the requirement they're seeking a variance from.

00:39:37.720 --> 00:39:41.640
 In any attempt to create a flag drive would be difficult.

00:39:41.640 --> 00:39:44.360
 And that flag drive length would again require

00:39:44.360 --> 00:39:45.720
 a variance from this body.

00:39:45.720 --> 00:39:50.280
 So any way you go about it, a variance would be needed

00:39:50.280 --> 00:39:53.440
 in order for this person to plot

00:39:53.440 --> 00:39:55.920
 and then subsequently develop on this lot.

00:39:55.920 --> 00:40:02.840
 This variance request is not expected to vary

00:40:02.840 --> 00:40:06.600
 the provisions of Denton's codes or plans.

00:40:06.600 --> 00:40:09.720
 It meets all the subdivision requirements

00:40:09.720 --> 00:40:12.620
 except for the requested variance.

00:40:12.620 --> 00:40:17.120
 There is also a future right away easement on the property

00:40:17.120 --> 00:40:21.440
 to preserve a corridor for a future primary material

00:40:21.440 --> 00:40:23.860
 as identified in the mobility plan.

00:40:23.860 --> 00:40:29.920
 Finally, these conditions that lead to this request

00:40:29.920 --> 00:40:34.920
 and hardship have an existence prior to the code requirements.

00:40:35.920 --> 00:40:37.720
 It's been recorded with Denton County

00:40:37.720 --> 00:40:40.240
 this particular lot configuration

00:40:40.240 --> 00:40:44.800
 that is out of compliance since at least 1987,

00:40:44.800 --> 00:40:48.160
 well before our requirement for a maximum three lots

00:40:48.160 --> 00:40:53.160
 was in place and hence not the action of the owner

00:40:53.160 --> 00:40:54.900
 of this piece of land.

00:40:54.900 --> 00:41:01.240
 With these considerations in mind staff does recommend

00:41:01.240 --> 00:41:03.720
 approval of this subdivision variance requests

00:41:03.720 --> 00:41:06.480
 as it complains with the criteria for approval

00:41:06.480 --> 00:41:08.720
 in the Denton development code.

00:41:08.720 --> 00:41:12.040
 At this time, I'm willing to take any questions.

00:41:12.040 --> 00:41:21.120
 - Any questions or motion?

00:41:21.120 --> 00:41:25.840
 Commissioner Prado-Carrillo.

00:41:25.840 --> 00:41:31.200
 - Okay, I move that we approve

00:41:31.200 --> 00:41:33.120
 the subdivision variance request.

00:41:34.640 --> 00:41:39.080
 - Okay, and Commissioner Dyer.

00:41:39.080 --> 00:41:40.120
 - I will second that.

00:41:40.120 --> 00:41:43.720
 - Any discussion or questions?

00:41:43.720 --> 00:41:47.360
 Seeing none, I'll call for a vote on the board.

00:41:47.360 --> 00:41:54.500
 That item passes three one.

00:41:54.500 --> 00:42:00.400
 That brings us to item four G, FP25-0006.

00:42:04.560 --> 00:42:09.560
 - Okay, let's see, there we go.

00:42:09.560 --> 00:42:14.960
 Matt Bodean here presents a final plat

00:42:14.960 --> 00:42:20.040
 for the piece of property that was under question

00:42:20.040 --> 00:42:22.280
 regarding the variance that was just approved.

00:42:22.280 --> 00:42:26.280
 This piece of property is an EGJ.

00:42:26.280 --> 00:42:29.520
 Since planning zoning commission

00:42:29.520 --> 00:42:32.520
 approved the subdivision variance request

00:42:32.520 --> 00:42:33.880
 associated with this final plat,

00:42:33.880 --> 00:42:37.200
 staff is recommending approval of said final plat.

00:42:37.200 --> 00:42:42.080
 - Commissioner Villarreal.

00:42:42.080 --> 00:42:42.920
 - Move approval.

00:42:42.920 --> 00:42:48.920
 - Commissioner Prado-Carrillo.

00:42:48.920 --> 00:42:50.320
 - I second.

00:42:50.320 --> 00:42:52.420
 - Any discussion or questions?

00:42:52.420 --> 00:42:56.440
 Seeing none, I'll call for a vote on the board.

00:43:01.620 --> 00:43:03.240
 That item passes four zero.

00:43:03.240 --> 00:43:08.720
 That brings us to our public hearings.

00:43:08.720 --> 00:43:13.720
 The first item, five A, is requested to be withdrawn.

00:43:13.720 --> 00:43:17.880
 It'll be re-noticed for a future meeting.

00:43:17.880 --> 00:43:23.920
 That brings us to item five B, S24-0006.

00:43:30.520 --> 00:43:35.520
 - Good evening, this is a specific use permit request

00:43:35.520 --> 00:43:37.280
 for national equipment dealers,

00:43:37.280 --> 00:43:38.880
 Aaron Stanley, assistant planner.

00:43:38.880 --> 00:43:43.360
 This is a request for an equipment sales and rental use

00:43:43.360 --> 00:43:46.160
 to allow the development of a national equipment dealers

00:43:46.160 --> 00:43:47.860
 commercial business.

00:43:47.860 --> 00:43:51.560
 This business will facilitate the sale of construction

00:43:51.560 --> 00:43:54.400
 and agriculture equipment such as earth moving

00:43:54.400 --> 00:43:58.240
 carrier equipment, excavators, bulldozers, dump trucks,

00:43:58.240 --> 00:44:00.820
 compactors, pavers, things like that.

00:44:00.820 --> 00:44:04.760
 And this site is generally located west of I-35

00:44:04.760 --> 00:44:08.440
 and east of the terminus of Jim Crystal Road,

00:44:08.440 --> 00:44:11.560
 right where the portion of Jim Crystal was abandoned

00:44:11.560 --> 00:44:16.160
 in the year 2000 and a utility easement lies today.

00:44:16.160 --> 00:44:19.080
 The subject site is zoned light industrial today

00:44:19.080 --> 00:44:22.320
 and the future land use is regional mixed use.

00:44:22.320 --> 00:44:26.980
 So here is the proposed site plan.

00:44:28.400 --> 00:44:32.740
 The specific use permit is proposing one 12,000

00:44:32.740 --> 00:44:36.160
 square foot building that would have the sales area

00:44:36.160 --> 00:44:39.320
 as well as office space and have 7,000 square feet

00:44:39.320 --> 00:44:42.720
 of warehouse space that's associated with maintaining

00:44:42.720 --> 00:44:45.600
 and storing some of the equipment that they sell on site.

00:44:45.600 --> 00:44:51.800
 There is also an equipment display area circled in purple.

00:44:51.800 --> 00:44:56.360
 This is an outdoor area that is adjacent to the right of way

00:44:56.360 --> 00:45:00.040
 is about 42,000 square feet and would have all of

00:45:00.040 --> 00:45:03.880
 the equipment that they're selling, any outdoor storage

00:45:03.880 --> 00:45:07.640
 of parts or any other things that are not for immediate sale

00:45:07.640 --> 00:45:09.680
 would need to be opaquely screened.

00:45:09.680 --> 00:45:15.960
 And the building is approximately 31.5 feet

00:45:15.960 --> 00:45:18.560
 and they are proposing 24 vehicular spaces

00:45:18.560 --> 00:45:20.960
 circled in yellow.

00:45:20.960 --> 00:45:23.200
 The easement that I mentioned in the previous slide

00:45:23.200 --> 00:45:27.800
 is in red additionally, there's a 60 foot utility easement

00:45:27.800 --> 00:45:32.280
 and then there's gas easement and electric lines there.

00:45:32.280 --> 00:45:36.040
 So this is about 90 feet of area that they are proposing

00:45:36.040 --> 00:45:40.480
 their storage or their equipment display area

00:45:40.480 --> 00:45:43.260
 and their parking, so all paved surfaces.

00:45:43.260 --> 00:45:48.880
 Their landscape area here, so the requirement

00:45:48.880 --> 00:45:50.800
 is 15% landscape area.

00:45:50.800 --> 00:45:54.760
 They are proposing 27.6, including the detention pond

00:45:54.760 --> 00:45:57.600
 that's over, this is the south side of the site

00:45:57.600 --> 00:46:03.720
 and 23.4% tree canopy out of a 20% requirement.

00:46:03.720 --> 00:46:07.320
 A landscape compatibility buffer was required

00:46:07.320 --> 00:46:10.720
 on the north side of the site, it's circled in green.

00:46:10.720 --> 00:46:13.080
 This is to buffer from the self storage use

00:46:13.080 --> 00:46:14.600
 that is to the north of the site

00:46:14.600 --> 00:46:16.800
 and is classified as an industrial use.

00:46:16.800 --> 00:46:20.340
 And then there are a few landscape alternatives

00:46:20.340 --> 00:46:24.560
 that staff did approve in reviewing this plan.

00:46:24.560 --> 00:46:26.820
 Street trees are required for all of our sites

00:46:26.820 --> 00:46:28.440
 and with this being a textile roadway

00:46:28.440 --> 00:46:30.680
 and having a good amount of utility easement

00:46:30.680 --> 00:46:33.160
 along the right of way, they did move these further back

00:46:33.160 --> 00:46:35.460
 on site and one street tree was relocated

00:46:35.460 --> 00:46:37.620
 to the rear parking area, circled in blue.

00:46:37.620 --> 00:46:41.660
 And then a few trees from their parking lot landscaping

00:46:41.660 --> 00:46:44.160
 were also relocated to the rear of the site

00:46:44.160 --> 00:46:45.640
 due to these utility easements

00:46:45.640 --> 00:46:47.920
 and not allowing trees in this area.

00:46:51.200 --> 00:46:53.840
 This project does meet the criteria for approval

00:46:53.840 --> 00:46:55.840
 set out in the DDC.

00:46:55.840 --> 00:46:58.440
 It meets the goals of the comprehensive plan

00:46:58.440 --> 00:47:00.000
 and the future land use map.

00:47:00.000 --> 00:47:02.960
 Some of these goals are to reinvest, revitalize

00:47:02.960 --> 00:47:05.460
 and redevelop key growth corridors,

00:47:05.460 --> 00:47:09.460
 which this would do as this is a currently undeveloped lot.

00:47:09.460 --> 00:47:13.780
 Another goal is to increase the city's job to worker ratio

00:47:13.780 --> 00:47:17.200
 and increase specifically jobs within the agricultural

00:47:17.200 --> 00:47:21.220
 construction and retail sectors, which this would do as well.

00:47:21.220 --> 00:47:26.560
 The proposal is also consistent with the LI zoning district

00:47:26.560 --> 00:47:29.600
 and is not expected to generate any adverse fiscal,

00:47:29.600 --> 00:47:33.160
 environmental or infrastructure impacts.

00:47:33.160 --> 00:47:36.260
 And utilities do already serve and cross the property.

00:47:36.260 --> 00:47:40.880
 Public outreach was conducted in accordance

00:47:40.880 --> 00:47:43.760
 with state law in the DDC and staff did receive

00:47:43.760 --> 00:47:45.800
 one response in favor from the property

00:47:45.800 --> 00:47:48.500
 to the south of this subject area.

00:47:48.500 --> 00:47:53.720
 And staff is recommending approval of the SUP

00:47:53.720 --> 00:47:55.880
 with the following conditions.

00:47:55.880 --> 00:47:58.240
 To go through them real quickly, the first one is that

00:47:58.240 --> 00:48:01.160
 the development does need to substantially comply

00:48:01.160 --> 00:48:04.140
 with the attached site plan and landscape plan.

00:48:04.140 --> 00:48:09.200
 There are a few ways that it could change.

00:48:09.200 --> 00:48:12.200
 They would not be allowed to increase equipment sales

00:48:12.200 --> 00:48:15.140
 and rental use area, not be allowed to change

00:48:15.140 --> 00:48:19.240
 parking requirements, reduce buffering or screening,

00:48:19.240 --> 00:48:23.260
 or decrease the total landscape area by more than 5%.

00:48:23.260 --> 00:48:27.640
 Number two on these conditions does require that

00:48:27.640 --> 00:48:29.240
 even if they're not doing any of these things,

00:48:29.240 --> 00:48:32.360
 staff can say that the change to the specific use permit

00:48:32.360 --> 00:48:34.820
 would warrant coming before this body again.

00:48:34.820 --> 00:48:38.920
 The third is just acknowledging that this is

00:48:38.920 --> 00:48:40.880
 a TxDOT roadway they are adjacent to.

00:48:40.880 --> 00:48:43.320
 TxDOT is making some changes along I-35,

00:48:43.320 --> 00:48:47.040
 so if TxDOT does need them to change their access,

00:48:47.040 --> 00:48:50.540
 as long as it still matches on site, that can be done.

00:48:50.540 --> 00:48:55.480
 And the fourth is talking about the outdoor storage.

00:48:55.480 --> 00:48:58.040
 So at this time, the applicant is not proposing

00:48:58.040 --> 00:48:59.280
 any outdoor storage.

00:48:59.280 --> 00:49:03.360
 If that changes as they develop, they would be able

00:49:03.360 --> 00:49:05.960
 to make the necessary changes to their fencing

00:49:05.960 --> 00:49:08.220
 to be able to screen that outdoor storage

00:49:08.220 --> 00:49:09.500
 from the rights of way.

00:49:10.560 --> 00:49:13.400
 And number five is just that the zoning map

00:49:13.400 --> 00:49:15.380
 will reflect the specific use permit.

00:49:15.380 --> 00:49:19.760
 So their next steps would be city council on April 15th,

00:49:19.760 --> 00:49:21.600
 and I will stand for any questions.

00:49:21.600 --> 00:49:26.040
 - Thank you, Erin.

00:49:26.040 --> 00:49:32.660
 Any questions for staff at this time?

00:49:32.660 --> 00:49:38.200
 I will open the public hearing at this time.

00:49:38.200 --> 00:49:40.680
 I don't have any cards wishing to speak,

00:49:40.680 --> 00:49:42.340
 but this is a public hearing.

00:49:42.340 --> 00:49:45.600
 If you would like to come down and share any thoughts,

00:49:45.600 --> 00:49:46.520
 you're welcome to.

00:49:46.520 --> 00:49:54.240
 Seeing no movement.

00:49:54.240 --> 00:49:57.000
 I do have a question, I don't know if it's better

00:49:57.000 --> 00:49:58.580
 for staff or the applicant.

00:49:58.580 --> 00:50:02.960
 Condition three, if you can flip back to your condition,

00:50:02.960 --> 00:50:04.960
 it's a recommended conditions slide.

00:50:07.280 --> 00:50:08.640
 So let me set the stage for this.

00:50:08.640 --> 00:50:11.440
 I noticed that, as you said, the street trees

00:50:11.440 --> 00:50:13.320
 are moved back to behind the easement,

00:50:13.320 --> 00:50:18.720
 and condition three is worded as if tech stop plans

00:50:18.720 --> 00:50:22.080
 on widening or changing.

00:50:22.080 --> 00:50:25.120
 And my understanding is there's an approved funded project

00:50:25.120 --> 00:50:30.120
 for this 35 EW I-35Y, so I imagine changes are coming.

00:50:30.120 --> 00:50:37.160
 So I'm just, I'm wondering whether that project

00:50:37.160 --> 00:50:39.160
 is far enough along that we've had discussions

00:50:39.160 --> 00:50:42.600
 with tech stop to understand whether the widening

00:50:42.600 --> 00:50:46.160
 of the right of way would cause all the trees

00:50:46.160 --> 00:50:48.240
 that we're planning to be cut down.

00:50:48.240 --> 00:50:49.080
 Does that make sense?

00:50:49.080 --> 00:50:51.680
 - No, the applicant has, it does make sense, yes.

00:50:51.680 --> 00:50:54.000
 We have been working with tech stop on this project,

00:50:54.000 --> 00:50:57.720
 and so it is worded that if the plans for widening

00:50:57.720 --> 00:51:01.680
 impact the subject property, we don't anticipate

00:51:01.680 --> 00:51:04.000
 that they will, and the applicant has been talking

00:51:04.000 --> 00:51:08.280
 with tech stop and is aware of how tech stop updates

00:51:08.280 --> 00:51:11.080
 will impact the subject property.

00:51:11.080 --> 00:51:14.160
 This is just kind of a carve out in case things change,

00:51:14.160 --> 00:51:17.800
 but the applicant is aware of what tech stop plans

00:51:17.800 --> 00:51:18.640
 are right now.

00:51:18.640 --> 00:51:20.520
 - It looks like maybe the, if you can come down

00:51:20.520 --> 00:51:24.520
 and identify yourself and feel free to speak.

00:51:24.520 --> 00:51:27.280
 - Mack Mackey with Kimley Horn, 100 West Oak Street,

00:51:27.280 --> 00:51:30.680
 Suite 203, Denton, Texas.

00:51:30.680 --> 00:51:34.120
 So, do you have the site plan that we could open?

00:51:34.120 --> 00:51:43.680
 Yeah, so essentially the thick black line that you see

00:51:43.680 --> 00:51:47.080
 on the top of this site plan, that's the ultimate

00:51:47.080 --> 00:51:50.160
 tech stop taking right of way that has already happened,

00:51:50.160 --> 00:51:54.280
 and then there's a 20 foot PUE on the eastern side

00:51:54.280 --> 00:51:55.880
 of the site, so the taking has already happened,

00:51:55.880 --> 00:51:59.000
 and the PUE is already in place for the current improvements

00:51:59.000 --> 00:52:02.000
 that are currently designed and in construction, so.

00:52:02.000 --> 00:52:03.760
 - Okay, thank you, that answered my question.

00:52:03.760 --> 00:52:05.640
 I just wanted to make sure that we weren't gonna set up

00:52:05.640 --> 00:52:09.480
 a situation where you would, by that provision three,

00:52:09.480 --> 00:52:12.440
 you would be forced to come back for a new SUP

00:52:12.440 --> 00:52:14.560
 just because a position of a tree changed.

00:52:14.560 --> 00:52:16.480
 - Yeah, I can't speak to what tech stop's gonna do

00:52:16.480 --> 00:52:19.520
 in 2040, but the current plan, that is the taking,

00:52:19.520 --> 00:52:20.800
 and that is the PUE, so.

00:52:20.800 --> 00:52:21.800
 - Thank you very much.

00:52:25.960 --> 00:52:29.600
 At this point, any other public wishing to speak

00:52:29.600 --> 00:52:30.480
 on this item?

00:52:30.480 --> 00:52:35.160
 Seeing none, I will close the public hearing.

00:52:35.160 --> 00:52:39.480
 Any questions from the commission or a motion?

00:52:39.480 --> 00:52:46.880
 Or discussion?

00:52:46.880 --> 00:52:53.000
 Commissioner Prodokorio?

00:52:55.880 --> 00:52:58.320
 - I'll make a motion that we approve the SUP

00:52:58.320 --> 00:53:00.120
 with the conditions listed.

00:53:00.120 --> 00:53:01.280
 - Okay, thank you.

00:53:01.280 --> 00:53:05.320
 Commissioner Dyer?

00:53:05.320 --> 00:53:08.280
 Thank you.

00:53:08.280 --> 00:53:10.640
 It's a second from Commissioner Dyer.

00:53:10.640 --> 00:53:13.360
 And any discussion?

00:53:13.360 --> 00:53:16.520
 More questions?

00:53:16.520 --> 00:53:21.400
 I'll just say, you know, 35 is a big,

00:53:23.720 --> 00:53:27.120
 you know, a human-made divider.

00:53:27.120 --> 00:53:30.200
 You know, we have lots of industrial uses

00:53:30.200 --> 00:53:31.360
 to the west of here.

00:53:31.360 --> 00:53:36.720
 And, you know, there's other places on the other side

00:53:36.720 --> 00:53:38.800
 of the freeway where this may not make sense,

00:53:38.800 --> 00:53:41.200
 but I think it makes sense here.

00:53:41.200 --> 00:53:46.440
 So I'm comforted that the qualities of the SUP

00:53:46.440 --> 00:53:47.800
 are satisfied, so.

00:53:47.800 --> 00:53:51.200
 Seeing no other questions,

00:53:51.200 --> 00:53:53.040
 I will call for a vote on the board.

00:53:53.720 --> 00:53:54.560
 Okay.

00:53:54.560 --> 00:54:00.200
 That item passes four, zero.

00:54:00.200 --> 00:54:04.920
 That brings us to our last public hearing,

00:54:04.920 --> 00:54:09.840
 item 5C, DCA 25-0011.

00:54:09.840 --> 00:54:12.080
 - Good evening, Commission.

00:54:12.080 --> 00:54:13.880
 Bryce Van Arsdale, Assistant Planner.

00:54:13.880 --> 00:54:17.400
 Staff is requesting withdrawal of this item

00:54:17.400 --> 00:54:20.040
 from the agenda tonight in order to ensure

00:54:20.040 --> 00:54:22.360
 that all state-required noticing standards

00:54:22.360 --> 00:54:24.280
 are met prior to the public hearing.

00:54:24.280 --> 00:54:27.600
 - Thank you, Bryce.

00:54:27.600 --> 00:54:32.040
 This is a public hearing.

00:54:32.040 --> 00:54:34.280
 I haven't opened it yet because we're planning

00:54:34.280 --> 00:54:37.520
 on re-noticing it, but I do see a couple

00:54:37.520 --> 00:54:39.800
 of attendees in the audience.

00:54:39.800 --> 00:54:47.760
 Do we need to open the public hearing?

00:54:47.760 --> 00:54:48.600
 Okay.

00:54:52.640 --> 00:54:55.560
 (faintly speaking)

00:54:55.560 --> 00:54:59.800
 Yeah, if you did come because you're interested

00:54:59.800 --> 00:55:02.520
 in this particular case, I would suggest

00:55:02.520 --> 00:55:05.720
 that you get with Bryce or other staff

00:55:05.720 --> 00:55:06.880
 immediately following this.

00:55:06.880 --> 00:55:11.160
 I think this is the last main item on the meeting agenda.

00:55:11.160 --> 00:55:13.400
 It should be coming up here, I would assume,

00:55:13.400 --> 00:55:17.000
 within about a month for the noticing timeline.

00:55:17.000 --> 00:55:18.000
 - April 23rd.

00:55:18.000 --> 00:55:19.000
 - Okay, April 23rd.

00:55:19.000 --> 00:55:19.840
 Thank you, Bryce.

00:55:21.720 --> 00:55:24.080
 So we will not take action on this item,

00:55:24.080 --> 00:55:30.000
 and that brings us to item 6A,

00:55:30.000 --> 00:55:34.680
 the PZ25017, the Planning and Zoning Commission Matrix.

00:55:34.680 --> 00:55:37.480
 - Thank you, Chair Pruitt.

00:55:37.480 --> 00:55:38.880
 Let me get to my notes here.

00:55:38.880 --> 00:55:48.400
 Okay, a couple of items to report on.

00:55:48.400 --> 00:55:51.960
 So let me get this down.

00:55:51.960 --> 00:55:56.240
 First of all, in terms of, so for commissioners

00:55:56.240 --> 00:55:59.680
 that are new, typically during this particular item,

00:55:59.680 --> 00:56:03.200
 we report, really staff reports on action

00:56:03.200 --> 00:56:06.200
 that council took on cases that the commission

00:56:06.200 --> 00:56:07.520
 would have seen previously.

00:56:07.520 --> 00:56:10.440
 So since your meeting on February 26th,

00:56:10.440 --> 00:56:12.320
 we have not had any zoning requests

00:56:12.320 --> 00:56:14.280
 or specific use permits or anything else

00:56:14.280 --> 00:56:17.440
 that this body might have seen since that time.

00:56:17.440 --> 00:56:21.400
 So our meeting calendar's been a little different

00:56:21.400 --> 00:56:23.440
 and not nearly many items scheduled,

00:56:23.440 --> 00:56:26.920
 so hence why there's been no action there.

00:56:26.920 --> 00:56:28.920
 Regarding the matrix document itself,

00:56:28.920 --> 00:56:32.560
 so we did remove the planning work program item

00:56:32.560 --> 00:56:33.400
 that was on there.

00:56:33.400 --> 00:56:35.040
 If you recall, Keisha gave a presentation

00:56:35.040 --> 00:56:37.120
 back on February 26th.

00:56:37.120 --> 00:56:38.800
 It's my understanding also at that last meeting

00:56:38.800 --> 00:56:40.160
 that there was a request for updates

00:56:40.160 --> 00:56:42.720
 regarding annexations that are approved by council.

00:56:42.720 --> 00:56:45.200
 I normally do that as part of my matrix report,

00:56:45.200 --> 00:56:47.120
 so I did not add that to this report,

00:56:47.120 --> 00:56:50.640
 but if you're wanting to see it reflected on there,

00:56:50.640 --> 00:56:53.560
 happy to do so, but since it was just

00:56:53.560 --> 00:56:56.920
 kind of a normal practice, hence why we did not add it.

00:56:56.920 --> 00:56:59.080
 And then lastly, I would like to take an opportunity

00:56:59.080 --> 00:57:00.760
 to recognize Commissioner Villarreal

00:57:00.760 --> 00:57:02.680
 with this being his last meeting here

00:57:02.680 --> 00:57:04.880
 for the Planning and Zoning Commission.

00:57:04.880 --> 00:57:07.040
 We appreciate his three and a half years of service

00:57:07.040 --> 00:57:09.120
 that he has provided to us.

00:57:09.120 --> 00:57:12.080
 If you're not familiar with Commissioner Villarreal's

00:57:12.080 --> 00:57:13.320
 efforts, he also joins us for the

00:57:13.320 --> 00:57:15.560
 Development Code Review Committee,

00:57:15.560 --> 00:57:18.120
 so he takes time out of his schedule for that as well.

00:57:18.120 --> 00:57:20.840
 So looking back on some of the projects

00:57:20.840 --> 00:57:22.360
 that you've been involved in,

00:57:22.360 --> 00:57:23.920
 unfortunately we did not get to

00:57:23.920 --> 00:57:25.360
 what I would call parking 2.0,

00:57:25.360 --> 00:57:28.200
 which was the request for removing parking,

00:57:28.200 --> 00:57:29.160
 minimum parking requirements,

00:57:29.160 --> 00:57:30.520
 but it's still on the Development Code Review

00:57:30.520 --> 00:57:33.640
 Committee's work program, so we haven't forgotten.

00:57:33.640 --> 00:57:35.200
 But I do want to acknowledge,

00:57:35.200 --> 00:57:37.320
 I know you were very instrumental in providing feedback

00:57:37.320 --> 00:57:39.160
 with respect to our short-term rentals ordinance

00:57:39.160 --> 00:57:42.520
 that we worked on, being very concerned

00:57:42.520 --> 00:57:44.240
 regarding implications on single-family

00:57:44.240 --> 00:57:46.440
 residential neighborhoods and being very concerned

00:57:46.440 --> 00:57:50.200
 about that, and I know you had acknowledged

00:57:50.200 --> 00:57:52.440
 even when the commission was considering

00:57:52.440 --> 00:57:56.200
 that ordinance, some of the different perspectives

00:57:56.200 --> 00:57:59.800
 that you had considered and kind of moved off

00:57:59.800 --> 00:58:01.840
 of your position in the interest of some compromise,

00:58:01.840 --> 00:58:03.600
 and so you always have single-family

00:58:03.600 --> 00:58:06.040
 residential neighborhoods first and foremost,

00:58:06.040 --> 00:58:08.160
 just given whether it was on short-term rentals

00:58:08.160 --> 00:58:10.000
 or even on other development requests

00:58:10.000 --> 00:58:11.320
 that have come before the commission,

00:58:11.320 --> 00:58:12.840
 particularly in a zoning matter

00:58:12.840 --> 00:58:14.840
 when they're requesting those entitlements.

00:58:14.840 --> 00:58:17.040
 But also kind of looking back on some other

00:58:17.040 --> 00:58:18.800
 more significant projects you've been involved in,

00:58:18.800 --> 00:58:20.920
 obviously the adoption of the comprehensive plan

00:58:20.920 --> 00:58:24.160
 that we did in March 2022, that was on your watch.

00:58:24.160 --> 00:58:26.960
 Same with the mobility plan, we did that same night.

00:58:26.960 --> 00:58:29.280
 You were also very involved in the adoption

00:58:29.280 --> 00:58:30.640
 of the Southeast Denton area plan

00:58:30.640 --> 00:58:34.800
 and providing constructive comments

00:58:34.800 --> 00:58:37.280
 and interested in the public engagement

00:58:37.280 --> 00:58:39.520
 and then the action items that were recommended.

00:58:39.520 --> 00:58:41.920
 Same with the design downtown Denton plan as well

00:58:41.920 --> 00:58:44.440
 and being involved in that aspect.

00:58:44.440 --> 00:58:45.640
 I know we had made some amendments

00:58:45.640 --> 00:58:46.960
 to the Denton Development Code.

00:58:46.960 --> 00:58:49.960
 The list was long, so I picked a few with that,

00:58:49.960 --> 00:58:52.400
 but horizontal multi-family living,

00:58:52.400 --> 00:58:54.200
 that was a new land use type

00:58:54.200 --> 00:58:55.680
 that we were seeing more and more of,

00:58:55.680 --> 00:58:57.560
 and so we had done some amendments to the code

00:58:57.560 --> 00:58:59.360
 to be able to accommodate that.

00:58:59.360 --> 00:59:00.720
 Data centers, I know you were involved

00:59:00.720 --> 00:59:02.440
 in that conversation as well,

00:59:02.440 --> 00:59:04.520
 because that was something our ordinance did not address

00:59:04.520 --> 00:59:07.360
 and seeing more of that happening within our community.

00:59:07.360 --> 00:59:10.400
 Reasonable accommodations in how we address

00:59:10.400 --> 00:59:13.840
 community homes and group homes, both from a DCRC perspective

00:59:13.840 --> 00:59:15.760
 but also the Planning and Zoning Commission,

00:59:15.760 --> 00:59:18.800
 and then also many property rezonings.

00:59:18.800 --> 00:59:21.240
 So I know particularly multi-family developments,

00:59:21.240 --> 00:59:22.640
 particularly where they were adjacent

00:59:22.640 --> 00:59:24.560
 to single-family residential neighborhoods.

00:59:24.560 --> 00:59:27.400
 You're always very interested in what the impacts

00:59:27.400 --> 00:59:29.800
 to the single-family residential neighborhoods would be.

00:59:29.800 --> 00:59:33.400
 And I'd be remiss if I didn't, or if I left off,

00:59:33.400 --> 00:59:36.120
 you'll definitely be known for plat extension requests,

00:59:36.120 --> 00:59:37.320
 how many are being requested.

00:59:37.320 --> 00:59:39.640
 So I know that's a common question.

00:59:39.640 --> 00:59:41.000
 And then like I said, the other item,

00:59:41.000 --> 00:59:44.120
 just being listening to neighborhood concerns,

00:59:44.120 --> 00:59:46.560
 especially when people are here in opposition

00:59:46.560 --> 00:59:49.320
 and trying to push the developer

00:59:49.320 --> 00:59:52.040
 to find the compromise where feasible.

00:59:52.040 --> 00:59:54.600
 So with that, we thank you for your service.

00:59:54.600 --> 00:59:56.880
 We do have a certificate here for you,

00:59:56.880 --> 00:59:58.920
 so your token of appreciation.

00:59:58.920 --> 01:00:01.240
 And that concludes my report, so thank you.

01:00:01.240 --> 01:00:06.200
 (audience applauding)

01:00:06.920 --> 01:00:10.200
 - Yeah, I think I'll just add to that that

01:00:10.200 --> 01:00:12.840
 I've learned a great deal from you, Jordan,

01:00:12.840 --> 01:00:17.840
 and appreciate your ability to think larger picture

01:00:17.840 --> 01:00:24.840
 about all of those who may have concerns that either can't

01:00:24.840 --> 01:00:27.520
 or didn't know about, can't attend

01:00:27.520 --> 01:00:30.080
 or didn't know about the hearings that we have.

01:00:30.080 --> 01:00:36.360
 Keeping those in mind throughout the public process

01:00:36.360 --> 01:00:38.640
 is very important, especially your focus

01:00:38.640 --> 01:00:43.640
 on Southeast Denton and District One wide,

01:00:43.640 --> 01:00:46.280
 about the concentration of housing types that are there

01:00:46.280 --> 01:00:51.280
 versus the rest of the city and how that area grows

01:00:51.280 --> 01:00:55.560
 and morphs over the coming decades.

01:00:55.560 --> 01:00:57.000
 So I really appreciate that.

01:00:57.000 --> 01:01:00.640
 I think many of those thoughts will continue in my mind

01:01:00.640 --> 01:01:03.640
 as we hear things upcoming.

01:01:03.640 --> 01:01:08.640
 And I hope to do you a good service

01:01:08.640 --> 01:01:11.920
 by making sure that the Southeast Denton plan

01:01:11.920 --> 01:01:13.520
 moves forward in implementation,

01:01:13.520 --> 01:01:18.520
 but also in such a way that we move from

01:01:18.520 --> 01:01:24.680
 an attitude of concern of disenfranchisement

01:01:24.680 --> 01:01:27.160
 from past actions in that area

01:01:27.160 --> 01:01:30.240
 to an attitude of, hey, we gave our input

01:01:30.240 --> 01:01:35.240
 and the city heard us and has now done the necessary things

01:01:35.240 --> 01:01:40.480
 to do what we wanted as opposed to what we didn't want.

01:01:40.480 --> 01:01:42.880
 So let me know if I'm going astray from that

01:01:42.880 --> 01:01:44.640
 'cause that's certainly my desire.

01:01:44.640 --> 01:01:51.680
 And Jordan, will you?

01:01:51.680 --> 01:01:53.840
 - If I could say a few words.

01:01:53.840 --> 01:01:56.200
 I just wanna first off thank Councilwoman Byrd

01:01:56.200 --> 01:01:58.280
 and former Councilwoman McGuire for providing me

01:01:58.280 --> 01:02:00.760
 the opportunity to serve the people of Denton

01:02:00.760 --> 01:02:02.760
 these past three and a half years.

01:02:02.760 --> 01:02:05.000
 It's been an honor to fight for neighborhood preservation

01:02:05.000 --> 01:02:07.840
 and citizen input, which I think y'all put

01:02:07.840 --> 01:02:09.960
 into good words there, and always fighting back

01:02:09.960 --> 01:02:12.240
 against overdevelopment, gentrification,

01:02:12.240 --> 01:02:14.560
 and untoward influence.

01:02:14.560 --> 01:02:17.960
 I will always fight for the community first

01:02:17.960 --> 01:02:19.280
 and I wanna thank the council members

01:02:19.280 --> 01:02:20.960
 for giving me that opportunity.

01:02:20.960 --> 01:02:23.280
 I also wanna thank Chairman Pruitt,

01:02:23.280 --> 01:02:26.320
 former Chairwoman Ellis, and my fellow commissioners

01:02:26.320 --> 01:02:28.040
 and the staff for their service.

01:02:28.040 --> 01:02:30.280
 It's been a pleasure serving you as your vice chair

01:02:30.280 --> 01:02:32.760
 these past few months and as your fellow colleague

01:02:32.760 --> 01:02:34.080
 these past several years.

01:02:34.080 --> 01:02:37.840
 With that, I hope that council and city management

01:02:37.840 --> 01:02:40.280
 are able to institute practices that would prevent

01:02:40.280 --> 01:02:43.000
 a forced resignation like this in the future.

01:02:43.000 --> 01:02:45.680
 It's unfortunate I have to leave at this moment,

01:02:45.680 --> 01:02:47.840
 but I cannot execute my duties here

01:02:47.840 --> 01:02:49.920
 while also working at the state capitol

01:02:49.920 --> 01:02:51.440
 during the legislative session.

01:02:51.440 --> 01:02:54.480
 So I hope staff or city management and our council

01:02:54.480 --> 01:02:57.760
 are able to find some resolution there.

01:02:58.320 --> 01:03:00.400
 With that, I pray my colleagues continue to strive

01:03:00.400 --> 01:03:02.000
 to make Denton a better place to live,

01:03:02.000 --> 01:03:03.760
 not just a bigger place to live.

01:03:03.760 --> 01:03:05.840
 It's been an honor to serve the people of Denton

01:03:05.840 --> 01:03:07.960
 and I look forward to serving y'all in a future capacity.

01:03:07.960 --> 01:03:08.800
 Thank you.

01:03:08.800 --> 01:03:13.680
 - Thank you, Jordan.

01:03:13.680 --> 01:03:20.240
 That brings us to our last item, item seven,

01:03:20.240 --> 01:03:22.760
 the concluding items.

01:03:22.760 --> 01:03:24.360
 - I realized in my matrix report

01:03:24.360 --> 01:03:25.840
 that I forgot to acknowledge

01:03:25.840 --> 01:03:27.680
 we actually have a block party.

01:03:27.680 --> 01:03:29.480
 All this conversation about Southeast Denton

01:03:29.480 --> 01:03:30.640
 made me think of the block party

01:03:30.640 --> 01:03:32.240
 that the team is working on.

01:03:32.240 --> 01:03:35.360
 So we've done a tremendous effort

01:03:35.360 --> 01:03:36.320
 on trying to get the word out

01:03:36.320 --> 01:03:37.640
 for the residents in Southeast Denton

01:03:37.640 --> 01:03:39.160
 to join us in our block party.

01:03:39.160 --> 01:03:43.120
 That is tomorrow afternoon from 5 p.m. to 7 p.m.

01:03:43.120 --> 01:03:46.920
 and Keisha, I'm drawing a blank on the name of the park.

01:03:46.920 --> 01:03:49.400
 Fredmore Park, thank you.

01:03:49.400 --> 01:03:51.520
 So I'm like, it's by the American Legion Center

01:03:51.520 --> 01:03:53.680
 and I can see all of the improvements around it.

01:03:53.680 --> 01:03:55.880
 But anyway, if anybody is interested in joining us

01:03:55.880 --> 01:03:58.440
 for the block party, we encourage you to do so.

01:03:58.440 --> 01:04:00.960
 Again, it's at Fredmore Park from five to seven.

01:04:00.960 --> 01:04:03.560
 We will have a variety of activities.

01:04:03.560 --> 01:04:05.560
 We'll have food there as well.

01:04:05.560 --> 01:04:07.800
 More importantly though, we are looking for public feedback

01:04:07.800 --> 01:04:09.960
 on some initiatives associated with implementation

01:04:09.960 --> 01:04:11.800
 of the Southeast Denton area plan

01:04:11.800 --> 01:04:15.240
 and looking to validate what we heard from the community

01:04:15.240 --> 01:04:16.920
 on certain action items

01:04:16.920 --> 01:04:18.840
 because it's continuing to provide the foundation

01:04:18.840 --> 01:04:20.880
 as we move forward on implementation

01:04:20.880 --> 01:04:21.960
 of some of those actions.

01:04:21.960 --> 01:04:24.960
 So if you have friends, family that are in Southeast Denton,

01:04:24.960 --> 01:04:26.600
 we encourage you to try and get the word out

01:04:26.600 --> 01:04:29.120
 and have them come join us again from five to 7 p.m.

01:04:29.120 --> 01:04:29.960
 So thank you.

01:04:29.960 --> 01:04:34.040
 - Thank you, Tina.

01:04:34.040 --> 01:04:36.480
 I'm excited to hear that.

01:04:36.480 --> 01:04:41.320
 I'll just offer a memory of mine early on

01:04:41.320 --> 01:04:44.440
 when I was on this commission three and a half years ago

01:04:44.440 --> 01:04:47.440
 or so as we were getting into some public engagement

01:04:47.440 --> 01:04:52.080
 for at that time, I think it was, I don't remember now,

01:04:52.080 --> 01:04:54.300
 may have been the mobility plan updates.

01:04:55.880 --> 01:05:00.880
 Yeah, and I made the comment that bridging the divide

01:05:00.880 --> 01:05:06.800
 between the busy lives that all of our residents lead

01:05:06.800 --> 01:05:11.800
 and the strange and jargon-filled things

01:05:11.800 --> 01:05:24.000
 that the city does here to be able to put the future

01:05:25.080 --> 01:05:28.000
 plans into action is always a challenge.

01:05:28.000 --> 01:05:30.200
 And I made the comment at that time

01:05:30.200 --> 01:05:32.160
 that I hoped that more of our engagement

01:05:32.160 --> 01:05:35.880
 would move toward meeting residents where they are

01:05:35.880 --> 01:05:39.120
 by having block parties and bringing food.

01:05:39.120 --> 01:05:42.800
 And I think this is a welcome addition.

01:05:42.800 --> 01:05:46.680
 I think our team really over the last two years or so

01:05:46.680 --> 01:05:50.960
 as we've delved into the small area plans

01:05:50.960 --> 01:05:54.200
 and other efforts has really taken that to heart.

01:05:54.200 --> 01:05:55.320
 And I just thank you.

01:05:55.320 --> 01:05:57.520
 I think it's always a challenge.

01:05:57.520 --> 01:06:00.860
 We can always do better, but it shows, so thank you.

01:06:00.860 --> 01:06:03.980
 Any other concluding items?

01:06:03.980 --> 01:06:09.740
 I'll just say, Jordan, good luck at the state ledge.

01:06:09.740 --> 01:06:14.400
 Hopefully, whereas there's a lot going on,

01:06:14.400 --> 01:06:19.400
 so thank you for your service in all the ways that you do.

01:06:22.520 --> 01:06:27.480
 With that, seeing no objection, I will adjourn this meeting

01:06:27.480 --> 01:06:30.760
 of the Denton Planning and Zoning Commission at 7, 10 p.m.

01:06:30.760 --> 01:06:31.580
 Thank you.