 Good afternoon and welcome to the City of Denton Planning and Zoning Commission work

00:00:08.720 --> 00:00:09.720
 session.

00:00:09.720 --> 00:00:18.640
 We'll call us to order at 5.03 p.m. February 26, 2025.

00:00:18.640 --> 00:00:29.120
 The first item that we have on the work session agenda is any comments for the regular session

00:00:29.120 --> 00:00:31.960
 consent agenda.

00:00:31.960 --> 00:00:39.160
 I do not see any members of the public present to comment, so we'll move on.

00:00:39.160 --> 00:00:47.880
 The next item is our clarification of agenda items listed for this meeting.

00:00:47.880 --> 00:00:50.760
 So we have a lot of consent agenda items.

00:00:50.760 --> 00:00:54.720
 Any questions about the consent agenda?

00:00:54.720 --> 00:00:57.460
 No, okay.

00:00:57.460 --> 00:01:07.200
 There was one updated item within that consent agenda that was emailed to you, and then we

00:01:07.200 --> 00:01:14.900
 do have some items for individual consideration this evening.

00:01:14.900 --> 00:01:43.200
 Next one is FP25006.

00:01:43.200 --> 00:01:52.760
 Good evening, Commission.

00:01:52.760 --> 00:01:57.520
 This is a request for a final plot in the ETJ of the City of Denton.

00:01:57.520 --> 00:02:02.080
 It is a final plot that will create three residential lots.

00:02:02.080 --> 00:02:13.760
 It's located about 1,000 feet east of FM2164 on a private road, and about 5,450 feet north

00:02:13.760 --> 00:02:15.460
 of loop 288.

00:02:15.460 --> 00:02:19.680
 It does not meet our criteria for approval at this time, so we're recommending denial.

00:02:19.680 --> 00:02:26.400
 However, we have no objection to their first extension request to a date certain of March

00:02:26.400 --> 00:02:27.400
 19th.

00:02:27.400 --> 00:02:28.400
 Okay.

00:02:28.400 --> 00:02:30.120
 I'm not here to answer any questions.

00:02:30.120 --> 00:02:32.360
 Any questions on this item?

00:02:32.360 --> 00:02:33.360
 No?

00:02:33.360 --> 00:02:34.360
 Okay.

00:02:34.360 --> 00:02:35.360
 Thank you, Matt.

00:02:35.360 --> 00:02:36.360
 Next item, V24.

00:02:36.360 --> 00:02:45.240
 I think this is the first time I've seen a V before one of these items, 0137, Julie.

00:02:45.240 --> 00:02:50.040
 Yes, so this one's a little unique.

00:02:50.040 --> 00:02:58.000
 All right, I'm Julie Wyatt, principal planner, and I'm presenting tonight V24137 to you.

00:02:58.000 --> 00:03:02.000
 This is for an alternative development plan.

00:03:02.000 --> 00:03:06.360
 Just a quick summary, I could go over all the slides if you want to, or I could just

00:03:06.360 --> 00:03:08.280
 do a summary during work session.

00:03:08.280 --> 00:03:14.760
 So Commissioner Pruitt, you may remember, but under our 2002 Denton Development Code,

00:03:14.760 --> 00:03:19.800
 and that was the development code before the code that we have now, we had a process called

00:03:19.800 --> 00:03:22.280
 an alternative development plan.

00:03:22.280 --> 00:03:30.240
 And it allowed for a flexible process for P and Z to approve deviations from site development

00:03:30.240 --> 00:03:36.240
 standards, things like number of parking spaces, or where the parking was going to be installed,

00:03:36.240 --> 00:03:39.120
 maybe building orientation, landscaping.

00:03:39.120 --> 00:03:44.240
 If the applicant couldn't necessarily meet those requirements, they could request planning

00:03:44.240 --> 00:03:48.360
 and zoning commission approval of a site plan.

00:03:48.360 --> 00:03:50.560
 So that was an old process that we had.

00:03:50.560 --> 00:03:58.040
 We just have a few remaining in the city of Denton, but this is a request to modify an

00:03:58.040 --> 00:04:03.540
 approved alternative development plan that the applicant received in 2020.

00:04:03.540 --> 00:04:06.360
 So it's been going on for a while.

00:04:06.360 --> 00:04:08.740
 It's for the Agave Ranch project.

00:04:08.740 --> 00:04:16.040
 It is a single-family residential neighborhood that is currently under development on the

00:04:16.040 --> 00:04:18.240
 east side of FM 428.

00:04:18.240 --> 00:04:23.700
 So platting has been done, and really it's now they're installing the streets and going

00:04:23.700 --> 00:04:27.500
 to start building the houses soon.

00:04:27.500 --> 00:04:34.480
 The original alternative development plan had to do with a variety of things like architecture

00:04:34.480 --> 00:04:40.800
 on the structures and percentages of windows and doors and garage doors.

00:04:40.800 --> 00:04:48.560
 The specifically related to garage doors are the setbacks and then also the percentage

00:04:48.560 --> 00:04:52.840
 that a garage door could occupy in the front of a home.

00:04:52.840 --> 00:04:57.200
 So they did receive that alternative development plan approval in 2020.

00:04:57.200 --> 00:05:01.560
 They would like to tweak those provisions, and so that is the request.

00:05:01.560 --> 00:05:08.560
 So just ultimately the request is to allow the garages to be set back three feet from

00:05:08.560 --> 00:05:16.720
 the building frontage and then allow the two car garages to occupy 45 percent of the frontage

00:05:16.720 --> 00:05:23.500
 instead of 40, and then the three car garages 50 percent of the frontage instead of 40.

00:05:23.500 --> 00:05:25.280
 That's really the request.

00:05:25.280 --> 00:05:26.800
 We're going to have to get through this together.

00:05:26.800 --> 00:05:31.160
 It's going to be a little challenging to go through all of what was previously approved

00:05:31.160 --> 00:05:36.280
 and what's on the table now, but I'll be happy to answer any questions.

00:05:36.280 --> 00:05:39.400
 Any questions at this time?

00:05:39.400 --> 00:05:40.400
 Commissioner Riggs?

00:05:40.400 --> 00:05:48.520
 Yeah, so I was looking at it and one of the questions I had was, staff recommended a tweak

00:05:48.520 --> 00:05:49.520
 to it.

00:05:49.520 --> 00:05:52.280
 Can you kind of explain the tweak that you recommended?

00:05:52.280 --> 00:05:53.280
 Sure.

00:05:53.280 --> 00:05:58.720
 So I'll just skip ahead.

00:05:58.720 --> 00:06:02.360
 For the garage width, let me see which one would be best.

00:06:02.360 --> 00:06:03.680
 We'll look at this one.

00:06:03.680 --> 00:06:12.920
 So for the garage width, the original approval for the ADP allowed the two car garages to

00:06:12.920 --> 00:06:20.520
 occupy 45 percent of the frontage and three car garages to occupy 55 percent of the frontage,

00:06:20.520 --> 00:06:27.800
 but it limited the number of houses that could take advantage of that to 45 percent.

00:06:27.800 --> 00:06:31.240
 Given that that's kind of arbitrary, it's going to be kind of difficult maybe to apply

00:06:31.240 --> 00:06:38.800
 in terms of not only city staff, but also think about the sales staff for the builder

00:06:38.800 --> 00:06:42.140
 as well as buyers for those homes.

00:06:42.140 --> 00:06:51.480
 We felt like the better approach would be to just allow that small expansion of 45 percent

00:06:51.480 --> 00:06:58.560
 for any of the two car garages in Agave Ranch, but limit the three car garages to lots that

00:06:58.560 --> 00:07:01.800
 are 62 feet and wider.

00:07:01.800 --> 00:07:04.560
 So it would only be allowed on larger lots.

00:07:04.560 --> 00:07:09.280
 It seems to be a little more straightforward way to approach it instead of, well, the neighbor

00:07:09.280 --> 00:07:17.240
 got the 45 percent, but we hit 45 percent of the units with that one, so no more can

00:07:17.240 --> 00:07:18.240
 be done.

00:07:18.240 --> 00:07:20.720
 So we felt like it was probably just a fair way to approach it.

00:07:20.720 --> 00:07:23.200
 Did that make any sense?

00:07:23.200 --> 00:07:24.200
 No that did.

00:07:24.200 --> 00:07:28.760
 So does the number of lots that that could go on, is that kind of aligned with the 45

00:07:28.760 --> 00:07:29.760
 percent?

00:07:29.760 --> 00:07:30.760
 You know, I don't know.

00:07:30.760 --> 00:07:31.760
 I can look at it.

00:07:31.760 --> 00:07:34.040
 I would say it might be fewer than that.

00:07:34.040 --> 00:07:38.320
 Most of the lots in Agave Ranch are probably 50 feet wide.

00:07:38.320 --> 00:07:46.200
 They do have some larger lots that are 60 to 80 feet wide, but I could take a look at

00:07:46.200 --> 00:07:49.440
 that and see if we've got just a ballpark idea.

00:07:49.440 --> 00:07:52.440
 I think that's good enough.

00:07:52.440 --> 00:07:57.800
 Any other questions?

00:07:57.800 --> 00:08:00.760
 Okay.

00:08:00.760 --> 00:08:01.760
 Commissioner Dyer.

00:08:01.760 --> 00:08:04.720
 Okay, so I have a question.

00:08:04.720 --> 00:08:05.720
 Sure.

00:08:05.720 --> 00:08:12.960
 And I know I'm new, first night on the job, but when I'm hearing these differences in

00:08:12.960 --> 00:08:16.960
 the frontage, is it because they want to make the garages bigger or they kind of want to

00:08:16.960 --> 00:08:25.640
 shrink the living space on the house, like what's the actual reason for the differences?

00:08:25.640 --> 00:08:29.600
 I prepared a slide just for this question, so I'm excited.

00:08:29.600 --> 00:08:30.680
 All right.

00:08:30.680 --> 00:08:34.800
 So standard two-car garages are 16 feet wide.

00:08:34.800 --> 00:08:37.060
 So each car bay is eight feet wide.

00:08:37.060 --> 00:08:41.380
 So a three-car garage would then be 24 feet wide.

00:08:41.380 --> 00:08:47.920
 When we look at that 40% width regulation, it really is based upon a 50-foot-wide lot

00:08:47.920 --> 00:08:52.520
 with five-foot setbacks, which leaves you a 40-foot building pad.

00:08:52.520 --> 00:08:59.480
 And then that 16 feet is 40% of 40 feet.

00:08:59.480 --> 00:09:07.600
 Their product, the Builder Now, has a few models that are 39 feet wide.

00:09:07.600 --> 00:09:15.920
 So the garage door doesn't get bigger, but the house pad is slightly smaller.

00:09:15.920 --> 00:09:23.760
 And so it now ups that percentage of the area that the garage door, that that 16 feet would

00:09:23.760 --> 00:09:26.560
 accommodate.

00:09:26.560 --> 00:09:31.960
 So then if they're going from a 40-foot pad to a 39, now you've just got, I mean, it's

00:09:31.960 --> 00:09:37.120
 only a foot, but you've got a little bit extra in between the houses, as I said, on these

00:09:37.120 --> 00:09:38.120
 lots.

00:09:38.120 --> 00:09:42.320
 It'd be a larger setback on the side.

00:09:42.320 --> 00:09:43.320
 Okay.

00:09:43.320 --> 00:09:44.320
 Yeah.

00:09:44.320 --> 00:09:45.320
 Okay.

00:09:45.320 --> 00:09:49.320
 My only question, we don't have to answer it now if you already have it in the presentation,

00:09:49.320 --> 00:09:53.460
 but I actually haven't seen one of these yet.

00:09:53.460 --> 00:09:58.320
 So this is brand new to me, well, 2020 was before I was here.

00:09:58.320 --> 00:10:10.760
 But the, we're somewhat familiar with the considerations that we make for zoning changes

00:10:10.760 --> 00:10:16.800
 versus for plats, and I'm not sure exactly what the list is for these alternative development

00:10:16.800 --> 00:10:21.360
 plans because they were in the 2002 code, which we don't see very often.

00:10:21.360 --> 00:10:23.880
 So it looks like we'll see it in the...

00:10:23.880 --> 00:10:34.120
 Yeah, there's a list of criteria that they needed to meet in order to, you know, get

00:10:34.120 --> 00:10:35.120
 staff's recommendation.

00:10:35.120 --> 00:10:37.960
 Ultimately, it's something you all would consider.

00:10:37.960 --> 00:10:38.960
 Okay.

00:10:38.960 --> 00:10:40.480
 Thank you.

00:10:40.480 --> 00:10:42.320
 All right.

00:10:42.320 --> 00:10:44.240
 And we have two public hearings tonight.

00:10:44.240 --> 00:10:51.040
 First one is PD 23-0006.

00:10:51.040 --> 00:10:54.280
 And I see Julie is up for this one as well.

00:10:54.280 --> 00:10:55.280
 Okay.

00:10:55.280 --> 00:10:58.280
 Let me find it.

00:10:58.280 --> 00:11:02.360
 Ah, there it is.

00:11:02.360 --> 00:11:03.360
 Okay.

00:11:03.360 --> 00:11:04.360
 All right.

00:11:04.360 --> 00:11:05.360
 All right.

00:11:05.360 --> 00:11:09.800
 So this is a plan development for the Family Justice Center.

00:11:09.800 --> 00:11:12.320
 So just a quick summary of this proposal.

00:11:12.320 --> 00:11:20.200
 The site is located in the north side of the city on the east side of Bonnie Bray, just

00:11:20.200 --> 00:11:25.040
 south of Riney Road north, kind of between Windsor and Riney.

00:11:25.040 --> 00:11:27.240
 It's that box in yellow.

00:11:27.240 --> 00:11:32.360
 They are proposing to rezone the property from R7 to really a PD with that same base

00:11:32.360 --> 00:11:33.900
 zoning of R7.

00:11:33.900 --> 00:11:39.560
 And the purpose of this is to create or develop a mixed-use community facility.

00:11:39.560 --> 00:11:48.680
 And it would have a range of services, including residential component, office component, counseling

00:11:48.680 --> 00:11:49.680
 component.

00:11:49.680 --> 00:11:57.200
 But it really is intended to be sort of comprehensive to serve families within Denton County.

00:11:57.200 --> 00:12:01.520
 The proposal is consistent with the with the vision statement within our comprehensive

00:12:01.520 --> 00:12:04.080
 plan, as well as the future land use map.

00:12:04.080 --> 00:12:07.600
 And so staff recommends approval of the request.

00:12:07.600 --> 00:12:08.880
 I've got the site plan here.

00:12:08.880 --> 00:12:10.440
 It's a little, little difficult to see.

00:12:10.440 --> 00:12:20.440
 But I'll be happy to answer any questions and that's it.

00:12:20.440 --> 00:12:23.640
 Any questions?

00:12:23.640 --> 00:12:24.640
 I think we'll.

00:12:24.640 --> 00:12:25.640
 Yeah.

00:12:25.640 --> 00:12:28.280
 One from Commissioner Riggs.

00:12:28.280 --> 00:12:31.840
 So they're kind of sharing access, though, right?

00:12:31.840 --> 00:12:33.960
 Is that kind of what I read?

00:12:33.960 --> 00:12:37.380
 Well, that yes, that is that is a good question.

00:12:37.380 --> 00:12:39.360
 So there are three access points.

00:12:39.360 --> 00:12:43.160
 They actually don't have an access point to Bonnie Bray.

00:12:43.160 --> 00:12:46.300
 Their access comes from the north and the south.

00:12:46.300 --> 00:12:50.440
 So there is an emergency access only to the north.

00:12:50.440 --> 00:12:55.180
 Some might remember that that that access driveway to the north is actually related

00:12:55.180 --> 00:12:58.480
 to the Reeves Elementary School that's under construction right now.

00:12:58.480 --> 00:13:02.680
 They have coordinated with Denton ISD and gotten the necessary permissions for that

00:13:02.680 --> 00:13:04.080
 access point.

00:13:04.080 --> 00:13:06.200
 So that would be emergency only access.

00:13:06.200 --> 00:13:09.040
 It's that elementary school's bus loop.

00:13:09.040 --> 00:13:12.080
 Their main access is going to come from the south.

00:13:12.080 --> 00:13:18.760
 And that is is this it's it's a public right of way to that park property.

00:13:18.760 --> 00:13:23.020
 But then that would connect on to to Bonnie Bray.

00:13:23.020 --> 00:13:26.600
 We also worked with them to make sure that there was adequate pedestrian connectivity

00:13:26.600 --> 00:13:29.240
 because there is an elementary school right next door.

00:13:29.240 --> 00:13:34.440
 It'd be really great to make sure that that there are those connections for students.

00:13:34.440 --> 00:13:38.320
 And so there is a pedestrian connection along that southern property boundary.

00:13:38.320 --> 00:13:43.640
 It's going to connect to a planned trail in the park, which will then connect on to Reeves

00:13:43.640 --> 00:13:44.640
 Elementary.

00:13:44.640 --> 00:13:45.640
 Anything else?

00:13:45.640 --> 00:13:46.640
 All right.

00:13:46.640 --> 00:13:52.540
 We'll see you at the public hearing.

00:13:52.540 --> 00:13:57.560
 And the last public hearing tonight is Z250001.

00:13:57.560 --> 00:14:02.440
 Welcome Erin.

00:14:02.440 --> 00:14:12.560
 OK.

00:14:12.560 --> 00:14:17.840
 This is Sequoia Park rezoning from Residential 3 to Residential 6.

00:14:17.840 --> 00:14:21.160
 So I also just have a summary slide I'll go over and then I'll have a longer presentation

00:14:21.160 --> 00:14:24.700
 with the main session unless you guys have any questions.

00:14:24.700 --> 00:14:29.760
 So this is a request to rezone approximately eight point nine three acres from Residential

00:14:29.760 --> 00:14:31.960
 3 to Residential 6.

00:14:31.960 --> 00:14:41.160
 This is generally located north of Mingo Road, east or west of Nottingham Drive, generally

00:14:41.160 --> 00:14:46.720
 at the corner there and west of the Denton Bible College for reference.

00:14:46.720 --> 00:14:51.560
 The subject site is undeveloped currently and has been undeveloped since at least the early

00:14:51.560 --> 00:14:52.560
 1900s.

00:14:52.560 --> 00:14:56.160
 That was as far back as we could pin it on the aerials.

00:14:56.160 --> 00:15:00.360
 And the purpose of this rezoning is to facilitate future residential development in accordance

00:15:00.360 --> 00:15:02.320
 with our six standards.

00:15:02.320 --> 00:15:06.720
 The proposal is consistent with the overall goals and policies of the comprehensive plan

00:15:06.720 --> 00:15:09.240
 and staff is recommending approval.

00:15:09.240 --> 00:15:15.840
 I'm happy to answer any questions.

00:15:15.840 --> 00:15:20.120
 Seeing none, we'll see you at the public hearing.

00:15:20.120 --> 00:15:21.800
 Thank you.

00:15:21.800 --> 00:15:24.120
 All right.

00:15:24.120 --> 00:15:27.040
 We do have a couple of work session reports this evening.

00:15:27.040 --> 00:15:33.600
 First one is PZ25056, receive a report and hold a discussion regarding the fiscal year

00:15:33.600 --> 00:15:37.160
 planning work plan.

00:15:37.160 --> 00:15:48.120
 Good evening Chair and Commission, I'm Keisha Siriano, Assistant Plaint Director.

00:15:48.120 --> 00:15:53.880
 So the last couple of years, maybe a couple of you have been here when we've been giving

00:15:53.880 --> 00:15:59.040
 you updates on the two area plans, Southeast Denton and Design Downtown Denton.

00:15:59.040 --> 00:16:04.320
 Well we've started implementing both of those plans and Chair Pruitt challenged us last

00:16:04.320 --> 00:16:06.640
 year to hit the ground running and we've been.

00:16:06.640 --> 00:16:12.160
 So we're here tonight to give you some updates, not only on those plans, but what we've been

00:16:12.160 --> 00:16:16.640
 doing with the comp plan as well as some regulatory needs, historic preservation and neighborhood

00:16:16.640 --> 00:16:17.720
 engagement.

00:16:17.720 --> 00:16:22.160
 If you see a star on the slide, it's just to let you know that that item is also a City

00:16:22.160 --> 00:16:24.040
 Council strategic initiative.

00:16:24.040 --> 00:16:29.800
 And also want to let you know the city has a program called Invisio that we use to track

00:16:29.800 --> 00:16:35.480
 progress and all of our plans have been inputted and are now being tracked in that particular

00:16:35.480 --> 00:16:36.480
 program.

00:16:36.480 --> 00:16:39.880
 So if you go on our website, in between us giving you updates and you want to see what's

00:16:39.880 --> 00:16:46.640
 going on with a particular item, feel free to check out our dashboard.

00:16:46.640 --> 00:16:52.440
 So last summer, if you remember, Julie came in August and gave you an update for the comp

00:16:52.440 --> 00:16:56.840
 plan updates for that previous fiscal year and at that time she mentioned we were going

00:16:56.840 --> 00:17:01.480
 to have a road show and at this road show we were going to invite all the city departments

00:17:01.480 --> 00:17:05.920
 to come out and just have a conversation about what the comp plan is.

00:17:05.920 --> 00:17:06.920
 Why do we have it?

00:17:06.920 --> 00:17:07.920
 What does it do?

00:17:07.920 --> 00:17:08.920
 What's the purpose?

00:17:08.920 --> 00:17:13.060
 Go over a little bit their particular action items within their departments and then do

00:17:13.060 --> 00:17:14.400
 some follow ups.

00:17:14.400 --> 00:17:18.880
 So we did that back in November, right now in December we started meeting with each department

00:17:18.880 --> 00:17:24.600
 to go over their specific items, how they can use those items and policy recommendations

00:17:24.600 --> 00:17:27.640
 to put forth their projects and initiatives they want to do.

00:17:27.640 --> 00:17:31.320
 Also doing some checking, there's some things that we've realized some departments may be

00:17:31.320 --> 00:17:35.960
 lead and it really should be a different department so we're also checking those things, sitting

00:17:35.960 --> 00:17:39.600
 with them to see if the items that are proposed, is it still feasible?

00:17:39.600 --> 00:17:41.560
 The time frame, are those still feasible?

00:17:41.560 --> 00:17:46.240
 And so we've started in December, we're still working through each department, it's taking

00:17:46.240 --> 00:17:51.200
 a little bit just due to staff plates sometimes, it goes up and down but we're working and

00:17:51.200 --> 00:17:54.260
 so we'll continue to give updates on that as well.

00:17:54.260 --> 00:17:59.960
 And then we added to our work plan this year to do some quarter planning along I-35 so

00:17:59.960 --> 00:18:03.400
 staff has gone out and looked at their corridor, you know corridors are very important, they're

00:18:03.400 --> 00:18:08.200
 gateways to the city, you want your corridors to be welcoming and engaging and invite people

00:18:08.200 --> 00:18:12.520
 to stop in and check out dentists so we're working on that and checking our codes and

00:18:12.520 --> 00:18:16.040
 everything to see if they think they need to change or shift just based on how things

00:18:16.040 --> 00:18:20.160
 are looking right now.

00:18:20.160 --> 00:18:26.800
 So you challenged us, we had 30, I believe 30 actions Chair Pruitt for the Southeast

00:18:26.800 --> 00:18:31.200
 Dent plan for the first two years and you challenged us to get 15 done this year so

00:18:31.200 --> 00:18:34.140
 we're steadily working, we've hit the ground running.

00:18:34.140 --> 00:18:39.460
 So we started with establishing the overlay districts, we're working on residential and

00:18:39.460 --> 00:18:43.660
 the live work, residential staff has gone out in a windshield survey community, we really

00:18:43.660 --> 00:18:47.420
 want to make sure they preserve the character of the community so we're steadily working

00:18:47.420 --> 00:18:52.320
 on that and live work, remember Prairie Street used to be a black main street and they want

00:18:52.320 --> 00:18:55.720
 more of a live work feel in that area so we're also working on that.

00:18:55.720 --> 00:18:59.960
 So we put out a people economic development survey, we went to the MLK event, got some

00:18:59.960 --> 00:19:05.680
 surveys there, it's on the Discuss Denton, we also have a block party coming up in March

00:19:05.680 --> 00:19:11.240
 where we'll be having some visual preference surveys as well as pushing the live work survey

00:19:11.240 --> 00:19:15.800
 as well for the community and we're having a block party to hopefully encourage people

00:19:15.800 --> 00:19:19.560
 to come out and this thought it may be a fun way for them to socialize, engage with their

00:19:19.560 --> 00:19:25.560
 neighbors as well as give us the feedback that we need to prepare these items.

00:19:25.560 --> 00:19:30.520
 We've also in November helped partner with economic development and community services

00:19:30.520 --> 00:19:36.000
 to hold a small business boot camp, it was taken to Southeast Denton, we didn't get as

00:19:36.000 --> 00:19:40.600
 much participation from there as we wanted but we did get nice participation across the

00:19:40.600 --> 00:19:41.600
 city.

00:19:41.600 --> 00:19:44.680
 We're trying to do some more, the purpose of this people with economic development survey

00:19:44.680 --> 00:19:49.360
 is to really help us figure out what is it they need, what workshops they need, some

00:19:49.360 --> 00:19:53.440
 people may, maybe it's not, they're not ready to buy a home or not ready to start a business

00:19:53.440 --> 00:19:57.600
 but maybe it's more how do I manage my money so we have questions like that on that survey

00:19:57.600 --> 00:19:59.920
 to help inform some of these other items.

00:19:59.920 --> 00:20:04.400
 We also have a partnership right now, community services is doing that, we're in support of

00:20:04.400 --> 00:20:11.280
 with Stoke to provide mentoring at Project HOPE as well as some space for three months

00:20:11.280 --> 00:20:16.380
 for those that need small business assistance in space at actual Stoke so we're excited

00:20:16.380 --> 00:20:21.040
 about that and see how that goes and then I'm happy to report last summer we applied

00:20:21.040 --> 00:20:27.960
 for a grant for $75,000 to do a historic resource survey in Southeast Denton.

00:20:27.960 --> 00:20:33.880
 We saw a press release that we were awarded but we haven't had an official notification

00:20:33.880 --> 00:20:34.880
 so we're not sure.

00:20:34.880 --> 00:20:39.840
 That is a federal grant, everyone knows what's going on there so we'll keep you updated if

00:20:39.840 --> 00:20:46.720
 and when we receive that official notification and then lastly the plan asked for us to start

00:20:46.720 --> 00:20:51.680
 working on neighborhood empowerment zone just establish that initial program statement so

00:20:51.680 --> 00:20:56.240
 we've partnered with ED and community services as well and we've been talking to several

00:20:56.240 --> 00:21:02.320
 cities and so we'll keep you updated on their projects as well.

00:21:02.320 --> 00:21:07.600
 Design downtown Denton, so one of the first items was to adopt a new branding and advertising

00:21:07.600 --> 00:21:08.600
 strategy.

00:21:08.600 --> 00:21:12.960
 I'm not sure if you know the city is actually going through its own process, own branding

00:21:12.960 --> 00:21:17.160
 project should be wrapping up soon so we put this project on hold we do have funding set

00:21:17.160 --> 00:21:21.800
 aside for we put it on hold until the city's branding was done just to make sure everything

00:21:21.800 --> 00:21:27.280
 is cohesive and runs smoothly and then we have some regulatory changes that we're working

00:21:27.280 --> 00:21:28.400
 on.

00:21:28.400 --> 00:21:32.520
 You saw Julie's presentation those that you were here a couple weeks ago with the town

00:21:32.520 --> 00:21:38.360
 home development so that definitely touches this particular plan as well as working on

00:21:38.360 --> 00:21:42.560
 permitting and licensing to allow for balcony overhangs and sidewalk dining in the downtown

00:21:42.560 --> 00:21:48.320
 area as well as starting those initial stages for modifying the MN and MD districts and

00:21:48.320 --> 00:21:54.040
 downtown and you will probably have a presentation on that coming up soon and then lastly I just

00:21:54.040 --> 00:22:00.760
 want to mention both plans we have started trying to collaborate and communicate more

00:22:00.760 --> 00:22:01.760
 with CIP.

00:22:01.760 --> 00:22:06.920
 We've had at least two meetings the last meeting we had a couple weeks ago we did a deep deep

00:22:06.920 --> 00:22:13.240
 dive into both plans excuse me showing them those street cross sections just really want

00:22:13.240 --> 00:22:18.160
 them to be aware gave them a handout that when they receive a project within our two

00:22:18.160 --> 00:22:27.520
 plan areas that they're aware of what the plan recommends as far as the streets go.

00:22:27.520 --> 00:22:33.080
 Neighborhood engagement so we know this is something that is you all encourage city council

00:22:33.080 --> 00:22:38.160
 to encourage we all want more of this so we are on our work excuse me on our work plan

00:22:38.160 --> 00:22:42.200
 we really want to encourage and do more neighborhood engagement this year this is the base year

00:22:42.200 --> 00:22:47.560
 so we're just trying to establish what is that we have so we have a map here right already

00:22:47.560 --> 00:22:52.960
 on our website that shows some existing neighborhoods but we have no idea if those neighborhoods

00:22:52.960 --> 00:22:57.680
 are still operating so we want to deep dive and try to check in and see who those contacts

00:22:57.680 --> 00:23:03.960
 are also encourage later on in the year other groups to form and then at the block part

00:23:03.960 --> 00:23:08.680
 if you see that who was my neighbor that's a magnet and so you see you got your home

00:23:08.680 --> 00:23:12.800
 in the middle and then the ideal is to go around and get the contact information of

00:23:12.800 --> 00:23:15.440
 those around you and put on your refrigerator.

00:23:15.440 --> 00:23:20.160
 Just trying to do more outreach and more engagement and get our neighborhoods more engaged and

00:23:20.160 --> 00:23:24.440
 connected with each not only with each other but also learn more about the city and resources

00:23:24.440 --> 00:23:28.760
 and services that we have plan to do something electronically you see national they national

00:23:28.760 --> 00:23:35.560
 good neighbor day is September 28th so we're hoping to do something for that as well historic

00:23:35.560 --> 00:23:40.960
 preservation so the city does have a historic preservation plan and one of the recommendations

00:23:40.960 --> 00:23:46.320
 the plan is to broaden the tax exemption eligibility so we have a tax exemption program for properties

00:23:46.320 --> 00:23:50.560
 that are locally designated if they spend up to ten thousand dollars I believe over

00:23:50.560 --> 00:23:56.440
 two to three period they can submit and request for 50% tax break on their taxes and so we've

00:23:56.440 --> 00:24:02.160
 been working with our historic landmark commission to see if we want to expand expand that to

00:24:02.160 --> 00:24:07.720
 not only include the his those are designated but those are contributed so if you have a

00:24:07.720 --> 00:24:12.520
 historic district you have some properties in there that may not be designated but they

00:24:12.520 --> 00:24:16.440
 still contribute to the look and feel and character of the neighborhood so that meeting

00:24:16.440 --> 00:24:19.560
 it won't be next meeting it'll be a future meeting but we're working with them to figure

00:24:19.560 --> 00:24:27.080
 out on what options they would like to put forward so here's a couple of regulatory needs

00:24:27.080 --> 00:24:31.680
 I believe this is my last slide so we look at been looking at the tree preservation code

00:24:31.680 --> 00:24:36.000
 is doing assessment to see if there's any things we need to shift any areas of improvement

00:24:36.000 --> 00:24:40.560
 any things that's in there that's difficult to enforce we did have a meeting in January

00:24:40.560 --> 00:24:45.560
 with some landscape design professionals they gave us some great feedback so we're looking

00:24:45.560 --> 00:24:49.840
 at that information and then also looking to see like what design downtown didn't are

00:24:49.840 --> 00:24:55.400
 there any barriers within our tree code that's going to be a prohibit any infield development

00:24:55.400 --> 00:25:00.280
 coming in downtown we're also working teams been working collaboratively so there's another

00:25:00.280 --> 00:25:03.880
 team working on the landscape regulations I've been working together with the tree code

00:25:03.880 --> 00:25:07.600
 just make sure it's an alignment with that assessment as well as an alignment with the

00:25:07.600 --> 00:25:12.960
 city's water efficiency plan update and then if you all heard of a decision which may or

00:25:12.960 --> 00:25:17.880
 may not be a challenge depending on what happens with this legislative but look we're already

00:25:17.880 --> 00:25:23.240
 trying to be proactive with our notification requirements see what we may could do just

00:25:23.240 --> 00:25:27.640
 make sure we're on track with that and maintaining and updating the DDC whenever we have to do

00:25:27.640 --> 00:25:34.600
 a notification for that and then lastly like I just mentioned we are monitoring those legislators

00:25:34.600 --> 00:25:45.800
 changes and will definitely give you updates as needed moving forward any questions have

00:25:45.800 --> 00:25:53.680
 one there's more of a comment I'm excited to see the live work action in the southeast

00:25:53.680 --> 00:26:01.440
 and plan I would suggest that staff look at the provision that we have in the DDC I believe

00:26:01.440 --> 00:26:11.560
 it actually is opposite of the building code and banking requirements for what's designed

00:26:11.560 --> 00:26:16.480
 as the live work building type that may have just been an oversight when we had the 2019

00:26:16.480 --> 00:26:21.880
 code but be good to get that cleaned up so that we don't do all this work and then have

00:26:21.880 --> 00:26:33.520
 nobody use it because they can't yeah yes Commissioner Padron thank you Keisha a couple

00:26:33.520 --> 00:26:39.720
 questions with the southeast end engagement what types of engagement do you feel have

00:26:39.720 --> 00:26:45.840
 been more successful with engaging like our residents to get more involved or what types

00:26:45.840 --> 00:26:50.640
 of engagement methods have been applied to try to connect with our residents in the area

00:26:50.640 --> 00:26:55.160
 so the the southeast didn't team from what after a lot of engaging with them before I

00:26:55.160 --> 00:27:01.560
 came but from my understanding it was the the one-offs that just walking into restaurants

00:27:01.560 --> 00:27:09.880
 or shops or just catching people out in the park doing just conversations so we've we've

00:27:09.880 --> 00:27:14.960
 connected with southeast the neighborhood association we did at this week and we have

00:27:14.960 --> 00:27:19.480
 brought in this time with the as far as promoting the block party one thing we're going to try

00:27:19.480 --> 00:27:24.240
 this time is actually doing door hangers at each part we've done postcard we're gonna

00:27:24.240 --> 00:27:29.280
 try the door hanger and see how that works in addition to all the other flyers posters

00:27:29.280 --> 00:27:35.980
 large signs in the community so and hopefully we'll get a better idea of what works one

00:27:35.980 --> 00:27:39.960
 plan we have is on the day of is to really track and ask people how did you find out

00:27:39.960 --> 00:27:48.340
 about the event but yeah more grassroots speaking of that thank you I tried to look up more

00:27:48.340 --> 00:27:53.120
 information about the block party online is there a specific location to direct people

00:27:53.120 --> 00:27:57.200
 to find the information it will be on the disgusted and we've been working with more

00:27:57.200 --> 00:28:01.960
 com they just and everything the printers either yesterday or today okay that's probably

00:28:01.960 --> 00:28:08.960
 why you haven't seen anything yet okay thank you

00:28:08.960 --> 00:28:14.120
 commissioner riggs let's have more of a comment too I think all this is great thank you yeah

00:28:14.120 --> 00:28:19.960
 it's exciting to see so thank you one other thing you mentioned the Akuna decision just

00:28:19.960 --> 00:28:26.560
 because that's somewhat new to us could you explain what that is and what the impacts

00:28:26.560 --> 00:28:31.400
 that that might have I know there's still some pending things but I'm just aware of

00:28:31.400 --> 00:28:36.560
 what's going on

00:28:36.560 --> 00:28:43.360
 so it boils down to let's see I've slept since I've read it last but it boils down

00:28:43.360 --> 00:28:47.160
 to whether

00:28:47.160 --> 00:28:54.880
 citywide notice is required before development code changes that aren't zoning code changes

00:28:54.880 --> 00:29:00.880
 or that aren't pardon me that aren't discrete zoning changes because the state statute as

00:29:00.880 --> 00:29:07.120
 you all know has that 200 foot radius requirement and so there's been for a while an open question

00:29:07.120 --> 00:29:13.720
 of like when you're doing something that affects the whole study what is the 200 foot radius

00:29:13.720 --> 00:29:22.040
 and the default has been to do newspaper notice and the Akuna decision which is not yet binding

00:29:22.040 --> 00:29:30.120
 on the city of Denton basically says no that's insufficient direct notice to everyone in

00:29:30.120 --> 00:29:40.920
 the city is required yeah do we know how much it costs to do direct mailing notice to everybody

00:29:40.920 --> 00:29:45.880
 in the city just ballpark

00:29:45.880 --> 00:29:50.320
 this number I came up with I believe was short-term rentals and that may not have even been completely

00:29:50.320 --> 00:29:54.280
 citywide but I think we should have had 16,000 on each round of notifications for short-term

00:29:54.280 --> 00:30:01.160
 rentals and that was believed to our residential districts looking to the experts and them

00:30:01.160 --> 00:30:06.520
 in so less than or slightly probably more than half the city received those and that

00:30:06.520 --> 00:30:15.200
 was 16,000 so okay yeah we'll see what happens there I I know some of the short-term rental

00:30:15.200 --> 00:30:21.400
 notification I think that was a good example of how to inform our residents sometimes because

00:30:21.400 --> 00:30:27.920
 of the postcard format and everything the the 200 and 500 foot notifications can can

00:30:27.920 --> 00:30:35.000
 scare more than inform so as we do go through that that process and see where that lands

00:30:35.000 --> 00:30:42.360
 yeah it's it's always hard to boil down a 400 page document into something that people

00:30:42.360 --> 00:30:48.680
 can understand what's actually changing but we just need to be sensitive to that so thank

00:30:48.680 --> 00:30:59.000
 you very much thank you okay and with that that concludes our work session for this afternoon

00:30:59.000 --> 00:31:09.400
 we will reconvene at 630 oh we do I'm sorry I my brain thought we had done to one more

00:31:09.400 --> 00:31:17.600
 work section report item 3b pz 25072 receive a report and hold a discussion regarding the

00:31:17.600 --> 00:31:22.680
 development process and comprehensive planning we can conclude it if you don't if you don't

00:31:22.680 --> 00:31:30.280
 wanna we don't have to do this today if you don't want to okay good evening chair members

00:31:30.280 --> 00:31:34.960
 of the Commission I'm Mia Hahn senior planner and this is the planning one-on-one boot camp

00:31:34.960 --> 00:31:39.840
 we're going to talk a little bit about the development process as well as the comprehensive

00:31:39.840 --> 00:31:44.400
 planning process what's what goes into the comprehensive plan and things of that nature

00:31:44.400 --> 00:31:49.080
 this is a bit of a little layout of the the various topics that we're planning on bringing

00:31:49.080 --> 00:31:53.680
 to you all over the next few months for some of you Commissioner Pruitt or Chair Pruitt

00:31:53.680 --> 00:31:58.200
 I know that this will be a refresher for some of you newer Commission chairs some of this

00:31:58.200 --> 00:32:04.720
 information might be new these further topics at later dates will get more into the details

00:32:04.720 --> 00:32:11.760
 of like zoning and PDs annexations SUPs this presentation today will basically cover where

00:32:11.760 --> 00:32:15.880
 those kind of exist within the development review process so where we're getting from

00:32:15.880 --> 00:32:21.920
 a feasibility stage all the way to certificate of occupancy and businesses opening and then

00:32:21.920 --> 00:32:27.120
 like I said the later presentations will go more into detail on those so if you have questions

00:32:27.120 --> 00:32:30.960
 about specific details it might be covering in later topics but I'm gonna try to give

00:32:30.960 --> 00:32:39.200
 you a broad overview of some stuff today so the Denton Development Code and overview the

00:32:39.200 --> 00:32:43.640
 purpose of the Denton Development Code is to promote the health safety and welfare of

00:32:43.640 --> 00:32:48.840
 the residents it's to implement the comprehensive plan preserve and protect the natural environment

00:32:48.840 --> 00:32:53.160
 improve the city appearance so we have landscape standards and things of that nature within

00:32:53.160 --> 00:33:01.000
 their screening standards improve mobility so there's a items for or requirements for

00:33:01.000 --> 00:33:08.000
 a bike biking bike parking as well as transportation services and things of that nature facilitate

00:33:08.000 --> 00:33:14.560
 adequate public infrastructure encourage appropriate use of land we have the table of allowed land

00:33:14.560 --> 00:33:19.960
 uses that takes you through what uses are committed within each zoning district and

00:33:19.960 --> 00:33:28.040
 then establish procedures within planning to get to from like I said the feasibility

00:33:28.040 --> 00:33:32.840
 stage to ultimate construction and businesses opening within that planning or within the

00:33:32.840 --> 00:33:39.160
 DDC we have several planning tools zoning platting is one platting I think this body

00:33:39.160 --> 00:33:43.880
 sees the most of we've had a lot of plats on the consent agenda tonight for approval

00:33:43.880 --> 00:33:49.080
 zoning also we have a few of those cases Aaron presented to you a zoning case development

00:33:49.080 --> 00:33:56.120
 standards those are range from environmental requirements parking tree preservation lighting

00:33:56.120 --> 00:34:04.960
 landscaping things of that nature criteria manuals are published with our utility departments

00:34:04.960 --> 00:34:11.300
 that let us know or let developers know specifically what specs engineering specs and things to

00:34:11.300 --> 00:34:19.160
 put to install when they're doing public utilities and then process the ensuring fair treatment

00:34:19.160 --> 00:34:26.000
 consistent with predictable timelines and outcomes really just ensuring that we have

00:34:26.000 --> 00:34:36.800
 a written process for people to follow for zoning and planning purposes the 2019 development

00:34:36.800 --> 00:34:42.080
 code is the code that we are currently adhering to it's our current development code it does

00:34:42.080 --> 00:34:46.560
 have nine sub chapters originally when we adopted this code it had four hundred and

00:34:46.560 --> 00:34:50.840
 eighty pages we're now up to about five hundred and sixty five so just to give you an idea

00:34:50.840 --> 00:34:56.280
 of the things that we add it's a it's a living sort of document that we we bring code amendments

00:34:56.280 --> 00:35:03.760
 to this body and they're passed by council in order for them to be put into the development

00:35:03.760 --> 00:35:09.320
 code and it does include seventeen zoning districts and the regulations and requirements

00:35:09.320 --> 00:35:14.720
 for those zoning districts so a broad overview of the development review or development process

00:35:14.720 --> 00:35:19.680
 we start applicants off with the feasibility stage which is essentially where they get

00:35:19.680 --> 00:35:27.580
 to talk to the city and learn is their project actually feasible will there be zoning changes

00:35:27.580 --> 00:35:33.640
 needed is the use permitted by right what is the process for actually getting from empty

00:35:33.640 --> 00:35:39.640
 ground all the way to construction step two is the application phase that's where once

00:35:39.640 --> 00:35:44.960
 we figured out what it's gonna take we actually start to review applications for entitlement

00:35:44.960 --> 00:35:49.560
 civil engineering plans final planning all that stuff is established that's usually the

00:35:49.560 --> 00:35:54.400
 long longer process I think it requires a lot of back and forth sometimes there's several

00:35:54.400 --> 00:36:00.000
 applications that are required within there where applicants and contractors will submit

00:36:00.000 --> 00:36:04.640
 to the city for review city staff will check that against or for compliance with other

00:36:04.640 --> 00:36:10.700
 codes and criteria manuals and then will will again work with them will provide comments

00:36:10.700 --> 00:36:15.000
 and work with them on revisions and things of that nature once all that is done and all

00:36:15.000 --> 00:36:20.680
 the plans and stuff are submitted and approved we move on to pre-construction where we get

00:36:20.680 --> 00:36:26.640
 development contracts we host pre-construction meetings and give a notice to proceed that's

00:36:26.640 --> 00:36:31.280
 essentially where the contractors and the people that will be building the things meet

00:36:31.280 --> 00:36:40.160
 with the people in the city that will be inspecting the things and talk about what that process

00:36:40.160 --> 00:36:45.080
 looks like as the for the for the building of things next we're in construction so this

00:36:45.080 --> 00:36:50.080
 is when construction is happening permanent is happening inspections are happening and

00:36:50.080 --> 00:36:55.320
 then final stage is project completion where we're closed out and then there's a typically

00:36:55.320 --> 00:37:01.920
 a 24 month maintenance period so who's involved in this process as I was mentioning earlier

00:37:01.920 --> 00:37:09.640
 the reviewers usually they're wrangled together by our development facilitators and that is

00:37:09.640 --> 00:37:16.560
 Michelle Lexi and Miranda they are wonderful individuals who sort of stand in the way or

00:37:16.560 --> 00:37:22.320
 standing between the the planning team the engineering team and the development community

00:37:22.320 --> 00:37:26.600
 and really field all of our emails filter all the things through all the questions and

00:37:26.600 --> 00:37:32.360
 requests for meetings and stuff like that through to help facilitate this whole process

00:37:32.360 --> 00:37:37.220
 there this whole thing that is the development review process so we have our facilitators

00:37:37.220 --> 00:37:42.040
 and then also included in that we have the engineering team the planning team the building

00:37:42.040 --> 00:37:47.200
 safety team public works inspections and depending on the project we pull in or depending on

00:37:47.200 --> 00:37:51.880
 the application review we pull in several subject matters like the fire department watershed

00:37:51.880 --> 00:37:57.800
 parks DME and our consultant engineers as well.

00:37:57.800 --> 00:38:03.760
 So stage one and feasibility I covered this a little bit with that broad overview so during

00:38:03.760 --> 00:38:08.320
 our stage one feasibility what we have and didn't that I love about us is the pre application

00:38:08.320 --> 00:38:14.640
 conference tool which is a it allows for people to submit anything from like a paper napkin

00:38:14.640 --> 00:38:21.180
 drawing all the way to like detailed site plan for free they submitted to the city we

00:38:21.180 --> 00:38:26.920
 put together a development assistant review team of planners engineers all those people

00:38:26.920 --> 00:38:31.800
 that you saw involved in that they we provide sort of preliminary comments we do let them

00:38:31.800 --> 00:38:36.680
 know that they should not substitute them to review the development code they to still

00:38:36.680 --> 00:38:41.880
 familiarize themselves with the code and criteria manuals throughout their review process but

00:38:41.880 --> 00:38:46.760
 we give them comments provide them with comments at this phase on their preliminary drawing

00:38:46.760 --> 00:38:54.280
 so this lets them know if we notice that you know they're proposing a a industrial warehouse

00:38:54.280 --> 00:38:57.800
 on something that zone rule residential where you're going to have to go through a zoning

00:38:57.800 --> 00:39:01.320
 process you're going to have to do a zoning compliance plan this is where we tell all

00:39:01.320 --> 00:39:06.640
 of them all of those applications and those requirements that would be needed.

00:39:06.640 --> 00:39:11.560
 Once we've gotten through that phase we have stage two which is where we actually they

00:39:11.560 --> 00:39:16.260
 actually apply with those major applications so in that example that I just used they would

00:39:16.260 --> 00:39:22.020
 apply at this stage for a zoning change most likely that would come before this body they

00:39:22.020 --> 00:39:27.160
 would apply for a zoning compliance plan that would not depending on where you are would

00:39:27.160 --> 00:39:32.220
 not necessarily come before this body that's typically administrative approved and then

00:39:32.220 --> 00:39:38.360
 following that most likely civil engineering plans to establish any public facilities.

00:39:38.360 --> 00:39:42.600
 Some of the other application types that we have are alternative environmentally sensitive

00:39:42.600 --> 00:39:48.520
 area plans those do typically have to be approved by this body traffic impact analysis again

00:39:48.520 --> 00:39:54.740
 depending on the type of development the volume of traffic that's being brought in by the

00:39:54.740 --> 00:40:00.640
 development variances drainage studies textile permits easements right of way abandonments

00:40:00.640 --> 00:40:08.200
 are all sort of supplementary things that we take into account we assess a project see

00:40:08.200 --> 00:40:16.240
 if those are needed and then they would support them or apply for them at this at this time.

00:40:16.240 --> 00:40:23.200
 So again a little broad overview of some of those applications annexations that is when

00:40:23.200 --> 00:40:26.840
 a property is within the city's ECJ or outside of the city's limits and they want to be brought

00:40:26.840 --> 00:40:31.680
 in to the city's limits they will apply for that this body does not see those applications

00:40:31.680 --> 00:40:37.640
 those go straight to council and it does require some public hearings comprehensive plan amendment

00:40:37.640 --> 00:40:44.280
 is another one that we don't see quite often but this is a case where we have usually it's

00:40:44.280 --> 00:40:48.920
 the future land use map that they want to amend within the comprehensive plan to maybe

00:40:48.920 --> 00:40:53.920
 meet some changing conditions some change conditions since we have initially established

00:40:53.920 --> 00:41:00.320
 that future land use map and they have usually there's a project that that is that's following

00:41:00.320 --> 00:41:04.640
 behind this they have a reason for wanting to amend the comprehensive plan and an idea

00:41:04.640 --> 00:41:10.760
 that doesn't directly align with something that is the comprehensive plan currently shows

00:41:10.760 --> 00:41:16.880
 this body does review that make a recommendation and then council has the final say on that.

00:41:16.880 --> 00:41:22.680
 So this map and just these are images for the applications that we just talked about

00:41:22.680 --> 00:41:32.840
 before the ETJ properties excuse me properties within the the ETJ are shown here or ETJ one

00:41:32.840 --> 00:41:37.640
 are shown here in light blue properties within ETJ two are shown within the purple area so

00:41:37.640 --> 00:41:43.000
 for annexations it would be properties that are within those areas that want to come into

00:41:43.000 --> 00:41:47.960
 the core city of didn't limits and then this is the the future land use map of the comprehensive

00:41:47.960 --> 00:41:55.580
 plan that's usually the the the subject of a comprehensive plan amendment zoning compliance

00:41:55.580 --> 00:42:01.080
 plan is another application that they would go through during that process again this body

00:42:01.080 --> 00:42:05.040
 doesn't typically see them in the rare the rare occasion that you do it's because it's

00:42:05.040 --> 00:42:12.840
 come from the razor ranch area off of university and I 35 that area specifically has an overlay

00:42:12.840 --> 00:42:18.940
 that requires that applications be approved by the planning and zoning commission and certain

00:42:18.940 --> 00:42:25.160
 for certain areas so you'll see that one and usually it's a standard I provide you with

00:42:25.160 --> 00:42:30.080
 the site plan I give you the basic you know details of the site plan they include elevations

00:42:30.080 --> 00:42:35.100
 and landscape plan and essentially if it meets the requirements of the razor ranch overlay

00:42:35.100 --> 00:42:41.000
 we approve it another application type are civil engineering plans that doesn't come

00:42:41.000 --> 00:42:45.000
 before this body at all I don't think there's been a case where that's had to come before

00:42:45.000 --> 00:42:50.600
 this body but that is essentially the plans for public improvement so it includes drainage

00:42:50.600 --> 00:42:56.680
 sewer water traffic road if there's any roadway improvements and things of that nature that

00:42:56.680 --> 00:43:02.840
 needs to be included zoning amendments so those are the zoning changes those are the

00:43:02.840 --> 00:43:10.440
 z application types that you all see for zoning amendments those do come before this body

00:43:10.440 --> 00:43:18.240
 for recommendation and then final approval is made by the city council and usually those

00:43:18.240 --> 00:43:22.640
 are zoning straight zoning changes are wanting to go from one zoning district so we have

00:43:22.640 --> 00:43:26.820
 our zoning district shown here in the table of allowed uses one zoning district to another

00:43:26.820 --> 00:43:34.640
 basically another application type we have our plan developments we do have two different

00:43:34.640 --> 00:43:40.440
 types of plan developments we have standard plan developments that includes a basic a

00:43:40.440 --> 00:43:46.520
 site plan or a zoning compliance plan with landscape plans usually and a building footprint

00:43:46.520 --> 00:43:51.240
 or envelope sometimes building elevations I believe are included in there also and a

00:43:51.240 --> 00:43:56.280
 development is essentially oh and PD development standards is included in the standard plan

00:43:56.280 --> 00:44:03.280
 development and these are essentially districts or zonings within forward like specific for

00:44:03.280 --> 00:44:08.800
 a specific area so if a area is under a plan development most likely it does refer to the

00:44:08.800 --> 00:44:14.140
 code in some capacity or form but it usually has either additional restrictions or additional

00:44:14.140 --> 00:44:21.400
 flexibility within the PD that that the code doesn't allow for by right I mean the point

00:44:21.400 --> 00:44:26.960
 of a plan development is it's supposed to be a tool to allow for unique types of developments

00:44:26.960 --> 00:44:33.960
 within the within the city and one example that comes to mind is one that I worked on

00:44:33.960 --> 00:44:39.340
 I believe last year maybe over the past couple of years actually that had a mix of uses a

00:44:39.340 --> 00:44:44.600
 commercial and a residential component as well as identified a street layout it had

00:44:44.600 --> 00:44:49.520
 preliminary drainage or utilities in there including drainage water sewer and electrical

00:44:49.520 --> 00:44:56.040
 and the reason or one of the reasons that it came as a as a PD was because the community

00:44:56.040 --> 00:45:01.240
 surrounding residents wanted some additional protections put in place that otherwise would

00:45:01.240 --> 00:45:06.040
 have would have not had to be the case if it was just under a straight zoning district

00:45:06.040 --> 00:45:12.760
 another application type is a specific use permit this people apply for when the code

00:45:12.760 --> 00:45:18.600
 has a use that essentially we feel might be appropriate within that zoning district but

00:45:18.600 --> 00:45:23.560
 we may want to assess on a case by case basis that's what a specific use permit allows for

00:45:23.560 --> 00:45:31.880
 us to do and usually those do come with site plans and landscape plans and elevations also

00:45:31.880 --> 00:45:36.760
 they also come to this body for recommendation and City Council for final approval and then

00:45:36.760 --> 00:45:41.840
 here's an example I believe this this specific use permit was yeah related to building height

00:45:41.840 --> 00:45:49.040
 so we have in some areas where your building can't exceed a certain height based on what's

00:45:49.040 --> 00:45:53.600
 next to it or based on the zoning that's next to it and so this gave us the opportunity

00:45:53.600 --> 00:45:58.520
 to again assess the building and the use on the sort of case by case basis see how it

00:45:58.520 --> 00:46:04.440
 was oriented on the site and see if it was appropriate in fact for this site another

00:46:04.440 --> 00:46:09.320
 application that does come before this body is the environmental or alternate alternative

00:46:09.320 --> 00:46:13.760
 environmentally sensitive plan that becomes comes before this body for recommendation

00:46:13.760 --> 00:46:24.560
 and council for final decision essentially this application type allows for we have existing

00:46:24.560 --> 00:46:33.760
 environmentally sensitive areas it allows for it's a engineered solution to provide

00:46:33.760 --> 00:46:38.220
 for better treatment of the environmentally sensitive areas what it's what it's intended

00:46:38.220 --> 00:46:47.040
 to do so if a developer has a plan for development and it's supposed to happen over or on within

00:46:47.040 --> 00:46:52.980
 some environmentally sensitive area the alternative ESA plan is supposed to have a better solution

00:46:52.980 --> 00:46:58.080
 for allowing that development to sort of coexist within that area and then better treatment

00:46:58.080 --> 00:47:07.240
 for the environmentally sensitive areas that are there and this is a map showing that that

00:47:07.240 --> 00:47:11.360
 environmentally sensitive those environmentally sensitive areas across the city we do identify

00:47:11.360 --> 00:47:16.380
 across timber upland habitats water related habitats riparian buffers as well as flood

00:47:16.380 --> 00:47:22.880
 plain buffers with that okay so subdivision application types those were all all the application

00:47:22.880 --> 00:47:27.040
 types that I've gone over so far were more entitlement it's it's getting the property

00:47:27.040 --> 00:47:32.440
 into the city and then figuring out from a zoning perspective what land uses and developments

00:47:32.440 --> 00:47:37.960
 are allowed there one of the other application or types of I guess classes of applications

00:47:37.960 --> 00:47:44.040
 that we have is subdivisions that includes preliminary platting final platting replating

00:47:44.040 --> 00:47:51.320
 and vacating plats the preliminary plat is not a is no longer a tool that is required

00:47:51.320 --> 00:47:58.600
 it is an option for a lot of developments I believe it's required for is it ropes what's

00:47:58.600 --> 00:48:03.920
 one of those master plan community hunter it's hunter it's required for hunter so you

00:48:03.920 --> 00:48:10.360
 will see a preliminary plat before you required from from that development one of these days

00:48:10.360 --> 00:48:16.200
 but typically it's those are few apart between no one really uses that tool anymore final

00:48:16.200 --> 00:48:21.400
 plats you all see all the time this body has final approval of that of those we do have

00:48:21.400 --> 00:48:26.280
 minor plat application types that are administratively approved and those are typically if someone

00:48:26.280 --> 00:48:32.120
 is like drawing property lines with with very minor changes or something like that it's

00:48:32.120 --> 00:48:41.420
 one I believe it's one less than I should have noted it less than three lots and no

00:48:41.420 --> 00:48:46.840
 public utilities we have less than four lots of someone if someone is divide subdividing

00:48:46.840 --> 00:48:53.180
 an area or creating less than four plotted lots and they that that plat would not require

00:48:53.180 --> 00:48:58.560
 the extension of public utilities then it can be administratively approved otherwise

00:48:58.560 --> 00:49:03.860
 it does have to come before the playing is only Commission and this is just an example

00:49:03.860 --> 00:49:09.940
 of a plat you've seen them by now many times we have it typically includes the the face

00:49:09.940 --> 00:49:16.200
 of the plat the plat graphic of vicinity map showing where north is in a scale a legend

00:49:16.200 --> 00:49:21.600
 development notes are typically included in their meets and bounds description owner signature

00:49:21.600 --> 00:49:26.820
 and the title block and then the approval block is down here and for plots that that

00:49:26.820 --> 00:49:33.660
 come before this body there is a place for the chair to sign on these plots okay so those

00:49:33.660 --> 00:49:39.180
 are that's step one and two I guess yes I see questions I can stop at this point to

00:49:39.180 --> 00:49:43.540
 answer any okay since I'm a newbie I'm going to ask this question because you said something

00:49:43.540 --> 00:49:50.580
 that like piqued my interest so when you were talking about the plan developments for subdivisions

00:49:50.580 --> 00:49:56.440
 did I hear you correctly that our Commission they approve or deny we don't like recommend

00:49:56.440 --> 00:50:00.400
 in the City Council it moves on that's only if there's an issue and they have to appeal

00:50:00.400 --> 00:50:08.260
 it so for plan developments in this this application type it was it was the last one you just oh

00:50:08.260 --> 00:50:16.300
 for plats for subdivisions yes yes so that's for plat so okay developments are the zoning

00:50:16.300 --> 00:50:21.660
 piece of late like laying out the development for the land the plat is the official property

00:50:21.660 --> 00:50:26.440
 boundaries yes this body approves what can what those official property boundaries are

00:50:26.440 --> 00:50:32.820
 and for the most part is ministerial so it's if it meets the requirements of the code and

00:50:32.820 --> 00:50:48.220
 our checklist we we kind of have to approve it okay yeah just one the in in step two where

00:50:48.220 --> 00:50:58.020
 you talked about all the entitlements can you give us like a general average of understanding

00:50:58.020 --> 00:51:02.700
 what what the different timeline is for someone who needs entitlements versus for someone

00:51:02.700 --> 00:51:08.980
 who's doing a by right development project sure that's a good question so I think it

00:51:08.980 --> 00:51:12.820
 definitely depends on the entitlement because like a plan development has standard plan

00:51:12.820 --> 00:51:18.100
 development includes a complete detailed site plan and PD regulations that we have to review

00:51:18.100 --> 00:51:24.860
 and make sure that we're all okay with before we bring to this body those I would give a

00:51:24.860 --> 00:51:29.180
 lot of four to six months for for plan development and honestly I'm pulling these we when we

00:51:29.180 --> 00:51:34.520
 do the feasibility the pre-application conferences we usually give people a timeline so I'm giving

00:51:34.520 --> 00:51:38.740
 you the timeline that we usually give developers but it varies it depends on it depends on

00:51:38.740 --> 00:51:42.820
 how they submit it depends on how responsive developers are it depends on if we run into

00:51:42.820 --> 00:51:47.820
 issues with the neighborhood meeting it depends you know so it varies but I think for plan

00:51:47.820 --> 00:51:52.420
 developments it's probably about four to six months zoning amendments about three to four

00:51:52.420 --> 00:51:57.140
 months I think the the big hold up on that one is the fact that we have to give notices

00:51:57.140 --> 00:52:01.860
 for public hearings usually zoning amendments are straightforward if they you know are meeting

00:52:01.860 --> 00:52:08.020
 our criteria for approval planning is a we're easy it's easier for us to come to a recommendation

00:52:08.020 --> 00:52:12.080
 and therefore it's not a lot of the back and forth specific use permits are probably along

00:52:12.080 --> 00:52:20.220
 the same lines of plan developments four to six months let's see what else and then alternative

00:52:20.220 --> 00:52:27.100
 essays do you have I would think four to six months also yeah and I think that one PD the

00:52:27.100 --> 00:52:31.900
 you showed the example of 380 took over a year that one took a while and that is one

00:52:31.900 --> 00:52:39.160
 of those those outlier examples because of we really wanted to make sure we had the because

00:52:39.160 --> 00:52:42.700
 this one started off as a zone straight zoning case and we got a lot of feedback from the

00:52:42.700 --> 00:52:46.540
 community we really wanted to make sure that there was and the applicants wanted to make

00:52:46.540 --> 00:52:51.460
 sure that there was buying an agreement with the community before even coming before the

00:52:51.460 --> 00:52:58.340
 planning and zoning Commission again so that one took a second thank you on to number three

00:52:58.340 --> 00:53:03.620
 I think unless sorry Commissioner Riggs I have one question and maybe you'll get to

00:53:03.620 --> 00:53:09.300
 it or but kind of like Commissioner Dyer I'm new to got three meetings or so now but at

00:53:09.300 --> 00:53:15.460
 what point do we do we look at developer agreements DA's yeah okay yeah that I will get to that

00:53:15.460 --> 00:53:25.860
 that is usually in step before I want to you step three oh well okay development agreements

00:53:25.860 --> 00:53:34.380
 for so for like municipal utility districts and things like that we will establish those

00:53:34.380 --> 00:53:41.740
 well before I guess during the app during the feasibility phase for several projects

00:53:41.740 --> 00:53:47.180
 and then maybe during the application phase for other I think it depends on and Haley

00:53:47.180 --> 00:53:50.300
 you may have something to add here I think it depends on what the development agreement

00:53:50.300 --> 00:54:02.500
 is for so if your question was would PNC see those applications that would be no like Mia

00:54:02.500 --> 00:54:07.220
 mentioned sometimes most often for something like a municipal utility district we may enter

00:54:07.220 --> 00:54:11.980
 into a development agreement and those go straight to council once staff kind of negotiates

00:54:11.980 --> 00:54:15.700
 and gets a draft of it work with our city attorney's office make sure everything is

00:54:15.700 --> 00:54:21.620
 up to our legal standard and form and then those go to council for approval thank you

00:54:21.620 --> 00:54:33.900
 okay thank you all right ready for stage three stage three all right yeah okay pre-construction

00:54:33.900 --> 00:54:38.740
 so once we've gotten all the applications out of the way we've reviewed all the plans

00:54:38.740 --> 00:54:43.260
 we've given them the the go-ahead we've recommended approval they've gotten every approval from

00:54:43.260 --> 00:54:46.420
 the commission or the council whoever they need to get approval from and they're ready

00:54:46.420 --> 00:54:51.580
 to start construction there are a few things that they have to submit to the city development

00:54:51.580 --> 00:54:55.740
 contracts are one of them and exhibit a which gives us the estimated cost of construction

00:54:55.740 --> 00:55:00.860
 for them because I think we have some fees that are based on that cost that we collect

00:55:00.860 --> 00:55:06.960
 on our end during that point we get I thought you were referring to development contracts

00:55:06.960 --> 00:55:12.620
 commissioner rigs during that point is when we look at contracts for the development hold

00:55:12.620 --> 00:55:18.500
 harmless agreements for any public improvements that they install and then we also host a

00:55:18.500 --> 00:55:23.480
 pre-construction meeting is a meeting and that's a meeting with public works and the

00:55:23.480 --> 00:55:29.420
 subject matter experts on water lines and sewer lines and drainage and things like that

00:55:29.420 --> 00:55:36.420
 payment of fees and then initial inspections for erosion control great and once the great

00:55:36.420 --> 00:55:42.840
 grading is being done or for the grading to be done in tree protection fencing tree protection

00:55:42.840 --> 00:55:46.900
 tree preservation is a really big deal here and didn't so we take that a little we take

00:55:46.900 --> 00:55:53.900
 that very seriously and ensure that that that that stuff is laid out before we clear for

00:55:53.900 --> 00:55:59.800
 construction of buildings and projects going vertical and then we give a notice to proceed

00:55:59.800 --> 00:56:06.700
 which let's let's them begin construction stage four is construction so that's when

00:56:06.700 --> 00:56:13.100
 they are contractors are out there building our team is or city side is doing on site

00:56:13.100 --> 00:56:17.420
 inspection there's any follow-up questions or any change orders that happen I just got

00:56:17.420 --> 00:56:25.940
 a call today there was a rail that's too close to a fire lane for retaining wall and these

00:56:25.940 --> 00:56:31.060
 things happen on the field so it's it's once they get out there and they start construction

00:56:31.060 --> 00:56:36.140
 if there's any change orders they would they would submit them during this stage of construction

00:56:36.140 --> 00:56:44.040
 and then we final finalize it finalize the projects we do final walkthroughs final acceptance

00:56:44.040 --> 00:56:50.420
 of public infrastructure and then the contractors apply and we issue certificates of occupancy

00:56:50.420 --> 00:56:56.120
 for businesses to open up and that is pretty much the construction or the development review

00:56:56.120 --> 00:57:03.140
 process like I said the longest process is that stage to that application we tried our

00:57:03.140 --> 00:57:08.340
 best to let people know ahead of time what that's going to look like what that timeline

00:57:08.340 --> 00:57:13.260
 is going to look like so that they have that built into their budget and things but that

00:57:13.260 --> 00:57:17.460
 pretty much concludes the the development process are there any overall questions on

00:57:17.460 --> 00:57:30.620
 that end just just one I'm curious do we track the the number of by right projects that happen

00:57:30.620 --> 00:57:38.620
 versus the the number of projects that seek entitlements we could maybe get it well I'm

00:57:38.620 --> 00:57:43.540
 just curious it doesn't have to be a specific number I just don't know whether it's 50%

00:57:43.540 --> 00:57:50.660
 or 5% we could probably deduce it by pulling like building permit numbers versus zoning

00:57:50.660 --> 00:57:55.020
 cases maybe but I think even then you might get into a it might be a little weird because

00:57:55.020 --> 00:57:59.940
 some zoning cases include a bunch of different building permits right I don't know we could

00:57:59.940 --> 00:58:04.780
 see if we could get that that number for you it's nothing urgent maybe maybe when we do

00:58:04.780 --> 00:58:15.620
 our next yearly review I'd find that interesting so okay seeing nothing else Mia I have I have

00:58:15.620 --> 00:58:20.620
 a second part I'm sorry we're going to get into I just keep getting ahead of ourselves

00:58:20.620 --> 00:58:26.340
 I apologize this will be shorter this is just an overview of what comprehensive planning

00:58:26.340 --> 00:58:33.620
 is so the comprehensive plan sets policies and goals for the for the city it helps us

00:58:33.620 --> 00:58:38.220
 manage growth it helps us promote reinvest investment and reinvestment into the city

00:58:38.220 --> 00:58:45.580
 and in developments and improve the overall quality of life for the city of Denton it

00:58:45.580 --> 00:58:49.940
 is a guiding document a policy document it is not the didn't development code which has

00:58:49.940 --> 00:58:56.620
 the requirements and standards and things that we just discussed this document is really

00:58:56.620 --> 00:59:01.420
 a policy document and it's one one thing to be considered amongst a lot of things a lot

00:59:01.420 --> 00:59:06.460
 of goals and things within the city but it does try to be or it is it is as comprehensive

00:59:06.460 --> 00:59:18.580
 as you can think of it includes ten elements which are not showing here well it includes

00:59:18.580 --> 00:59:30.140
 mobility it includes land use it includes economic development it includes various various

00:59:30.140 --> 00:59:34.300
 elements various components of of planning everything that you I think everything that

00:59:34.300 --> 00:59:40.220
 you think of housing affordability there are quite a few things in there so we did update

00:59:40.220 --> 00:59:48.140
 the didn't twenty or plan didn't comprehensive plan in March of twenty twenty two we had

00:59:48.140 --> 00:59:51.820
 the didn't plan twenty thirty we now have the didn't plan twenty forty and we typically

00:59:51.820 --> 00:59:56.660
 I think update comprehensive plans every five to seven years to reflect changes in the current

00:59:56.660 --> 01:00:03.140
 and anticipated conditions address major local issues ensure compliance with you know changing

01:00:03.140 --> 01:00:08.860
 state legislation we have to keep updated with that and accommodate changes for unforeseen

01:00:08.860 --> 01:00:13.980
 circumstance like text that decides to randomly put a highway through your your city you got

01:00:13.980 --> 01:00:20.860
 to have to update your comp plan for that typical comp plan update fate our schedule

01:00:20.860 --> 01:00:26.860
 usually there's project initiation again feasibility where we try to assess what it's all going

01:00:26.860 --> 01:00:37.300
 to take phase two is usually phase two three and four is usually what we do a lot of engagement

01:00:37.300 --> 01:00:42.140
 and trying to assess where the community is what's happening what's going on in the community

01:00:42.140 --> 01:00:48.780
 as well as what their goals and desires are step or phase five is usually the we're getting

01:00:48.780 --> 01:00:56.740
 into adoption where we're talking to this body as well as council on the final document

01:00:56.740 --> 01:01:04.840
 and then phase six is adoption of the actual plan so within the comprehensive plan we have

01:01:04.840 --> 01:01:10.900
 implementation items their specific action items that we have established in the comprehensive

01:01:10.900 --> 01:01:16.100
 plan it identifies areas where we need to focus and sort of do some area planning it

01:01:16.100 --> 01:01:23.420
 also has elements of neighborhood planning population projections it also gives us planning

01:01:23.420 --> 01:01:28.800
 department some projects to coordinate with other departments on and local and regional

01:01:28.800 --> 01:01:38.500
 entities and then updates the plans and codes of the city or recommendations for updates

01:01:38.500 --> 01:01:44.900
 to plans and codes of the city as well as annexation and special study focus areas like

01:01:44.900 --> 01:01:50.140
 I mentioned earlier this is that element slide that I was looking for earlier so the plan

01:01:50.140 --> 01:01:56.220
 includes a framework of the comprehensive plan it includes items related to land use

01:01:56.220 --> 01:02:04.420
 it includes fiscal and economic vitality community character and urban design parks conservation

01:02:04.420 --> 01:02:10.460
 environment mobility items housing and neighborhoods community health safety services infrastructure

01:02:10.460 --> 01:02:15.660
 and utilities implementation and monitoring so it's a it's a it is what it is named it

01:02:15.660 --> 01:02:22.780
 is a very comprehensive document a comprehensive plan and policy goal for the for the city

01:02:22.780 --> 01:02:26.460
 and within the goal I just want to or within the comprehensive plan I wanted to give you

01:02:26.460 --> 01:02:33.700
 a sort of idea of the the actions that that come out of that I think within the Denton

01:02:33.700 --> 01:02:38.880
 2040 plan we have 272 actions and just two of them was to establish area plans which

01:02:38.880 --> 01:02:45.660
 also resulted in 53 actions for South East and then 23 specific actions for downtown

01:02:45.660 --> 01:02:51.960
 so it's it is our really our guiding document as far for the planning department that lets

01:02:51.960 --> 01:02:55.500
 us know the sort of things that we're supposed to be doing on a day-to-day and how we're

01:02:55.500 --> 01:03:01.940
 supposed to be supporting the various application types that we just talked about so within

01:03:01.940 --> 01:03:07.620
 the development review process the comprehensive plan like I said is one component that that

01:03:07.620 --> 01:03:13.220
 sort of informs what our our thought and how our vision should should flow and in response

01:03:13.220 --> 01:03:18.820
 to some of those applications we look at it when we are performing recommendations to

01:03:18.820 --> 01:03:24.920
 prepare for this body if you look at your backup for any zoning cases we do assess how

01:03:24.920 --> 01:03:31.180
 those requests adhere or align with the comprehensive plan so it is a a policy document in that

01:03:31.180 --> 01:03:36.460
 form and that is pretty much all I have for development review process and comprehensive

01:03:36.460 --> 01:03:55.580
 planning are there any questions seeing none thank you any more parts thank you very much

01:03:55.580 --> 01:04:02.980
 so with no objection and we'll bring our work session to a close and we will reconvene

01:04:02.980 --> 01:04:20.980
 at 630 in council chambers for our regular meeting it's good evening at 633 p.m. I will

01:04:20.980 --> 01:04:28.260
 call this regular meeting of the planning and zoning commission of Denton to order our

01:04:28.260 --> 01:04:35.940
 first order of business is the pledge of allegiance to the u.s. and Texas flags

01:04:35.940 --> 01:04:58.700
 to the flag of the United States of America and to the republic for which it stands one

01:04:58.700 --> 01:05:17.420
 indivisible next item is PZ 25004 consider approving the minutes for both the capital

01:05:17.420 --> 01:05:25.320
 improvement advisory committee and the planning and zoning meeting on February 12th a commissioner

01:05:25.320 --> 01:05:40.220
 padrone move approval commissioner Riggs second and let's vote on the board

01:05:40.220 --> 01:05:52.300
 that passes 4-0 next we have our consent agenda commissioner padrone move approval the consent

01:05:52.300 --> 01:06:05.580
 agenda commissioner Riggs second any questions let's vote on the board then

01:06:05.580 --> 01:06:13.820
 that also passes 4-0 next item that brings us to our items for individual consideration

01:06:13.820 --> 01:06:30.540
 first item for a is FP 25006 welcome Matt

01:06:30.540 --> 01:06:35.820
 good evening chair and commission Matt Bodine assistant planner here to present a request

01:06:35.820 --> 01:06:43.060
 for approval of a final plot in the city of Denton's ETJ one this plot would create three

01:06:43.060 --> 01:06:49.700
 residential lots the tract in question is located approximately 1200 feet east of FM

01:06:49.700 --> 01:06:57.460
 2164 along the private road and about 5500 feet north of loop 288 at this time staff

01:06:57.460 --> 01:07:02.340
 cannot recommend approval because it does not meet our criteria however we have no objection

01:07:02.340 --> 01:07:17.940
 to their extension request to a date certain of March 19 2025 any questions or emotion

01:07:17.940 --> 01:07:28.100
 commissioner padrone move to approve the extension request to a date certain of March 19th commissioner

01:07:28.100 --> 01:07:41.180
 Riggs second and let's call for a vote on the board

01:07:41.180 --> 01:07:52.780
 second item for that passes 4-0 next item for individual consideration for BV 24-0137

01:07:52.780 --> 01:08:00.380
 take us through this fearless leader Julie why the March down history lane good evening

01:08:00.380 --> 01:08:10.260
 Julie Wyatt principal planner and I'm presenting V 24-0137 agave ranch alternative development

01:08:10.260 --> 01:08:17.340
 plan so before I get into this specific request I just wanted to take a brief moment to talk

01:08:17.340 --> 01:08:22.580
 about alternative development plans generally so as we talked about in the work session

01:08:22.580 --> 01:08:28.140
 these are a process that this was a process that we had in the 2002 didn't development

01:08:28.140 --> 01:08:33.580
 code it is not something we carried forward to our current code so it's not something

01:08:33.580 --> 01:08:38.540
 you're going to see very often it is very limited and it would just be related to projects

01:08:38.540 --> 01:08:43.940
 that predated our current code and what it did is it authorized the planning zoning commission

01:08:43.940 --> 01:08:49.180
 to approve an alternative design to allow for flexibility I just have just a sample

01:08:49.180 --> 01:08:56.180
 on screen things like building orientation or maybe the number of parking spaces or buffers

01:08:56.180 --> 01:09:02.420
 those are the kinds of things that were generally requested as part of an alternative development

01:09:02.420 --> 01:09:07.820
 plan it's not included in the current code because we have other options for flexibility

01:09:07.820 --> 01:09:14.460
 now so that's why we didn't take this forward and I did want to let you know ADP's did

01:09:14.460 --> 01:09:20.260
 not include an expiration date so those approvals remain in effect to today and would control

01:09:20.260 --> 01:09:24.420
 over any conflicting provisions within our current codes so now we're going to get to

01:09:24.420 --> 01:09:31.340
 the the substance of this request so the agave ranch project is was a single-family residential

01:09:31.340 --> 01:09:39.440
 development it was platted with 239 single-family detached lots and 18 common area lots it's

01:09:39.440 --> 01:09:45.780
 located in the northeast part of town just east of 428 Sherman Drive the property is

01:09:45.780 --> 01:09:51.300
 outlined in black it has gone through the plotting process so it's near its nearing

01:09:51.300 --> 01:09:57.220
 going vertical in development I think they're working on public infrastructure right now

01:09:57.220 --> 01:10:03.300
 there was an ADP that was approved in 2020 because this was developed under our 2002

01:10:03.300 --> 01:10:10.740
 didn't development code and it was really to accommodate two specific builders plans

01:10:10.740 --> 01:10:15.540
 and it was and specifically what we're talking about tonight is those front entry garages

01:10:15.540 --> 01:10:19.940
 there were some other elements related to the ADP those are remaining in place it's

01:10:19.940 --> 01:10:24.580
 really that front entry garage we're talking about under the 2002 didn't development code

01:10:24.580 --> 01:10:29.900
 we had two provisions related to garages one is they could not be extend forward to the

01:10:29.900 --> 01:10:34.940
 front building line and the other is that the garage door could not occupy more than

01:10:34.940 --> 01:10:42.460
 40 percent of the building frontage that approved modification allowed the garages to move forward

01:10:42.460 --> 01:10:49.580
 a little bit up to six feet from the building plane or or 11 feet from a from a recessed

01:10:49.580 --> 01:10:56.980
 front door also allowed an eight-foot setback and then it also allowed a little larger width

01:10:56.980 --> 01:11:03.880
 with 45 percent of the total building frontage for two car garages and then 55 percent for

01:11:03.880 --> 01:11:10.220
 three car garages it did add a limitation on both of those that only 45 percent of the

01:11:10.220 --> 01:11:15.620
 products in agave ranch could avail themselves of this of this alternative development plan

01:11:15.620 --> 01:11:21.020
 and as I mentioned all other provisions related to the zoning the ADP all of those are in

01:11:21.020 --> 01:11:25.780
 place tonight we're just talking about these two provisions so now we're going to talk

01:11:25.780 --> 01:11:33.420
 about the request so the proposal is to revise that ADP to just simplify the language and

01:11:33.420 --> 01:11:38.260
 require the front entry garages be set back a minimum of three feet from the front face

01:11:38.260 --> 01:11:42.820
 of the building this is actually more consistent with the current standards our current standards

01:11:42.820 --> 01:11:48.140
 require just a three-foot offset so whether it's forward or behind that building garages

01:11:48.140 --> 01:11:53.860
 need to be offset has to allow some visual interest for the front of the homes and so

01:11:53.860 --> 01:11:58.300
 this is just slightly different and that it would set the garages back three feet from

01:11:58.300 --> 01:12:03.300
 the front building plane we feel like this is clear language it is more consistent with

01:12:03.300 --> 01:12:10.840
 the current builder who is developing the agave range development it also sets the garages

01:12:10.840 --> 01:12:16.460
 back just a little bit so it could potentially reduce the perceived size of the garage so

01:12:16.460 --> 01:12:22.140
 you could see a site plan on your screen I've got the yellow that is where that that front

01:12:22.140 --> 01:12:27.060
 plane of the house and you could see this garage is set back in this instance it's set

01:12:27.060 --> 01:12:31.500
 back 12 feet and you could see how that would kind of a similar product would look in real

01:12:31.500 --> 01:12:38.700
 life the second item I want to talk about is the front entry garage percentage so we're

01:12:38.700 --> 01:12:46.420
 proposing to revise that ADP to keep that 45 percent maximum on the two car garages

01:12:46.420 --> 01:12:52.980
 but remove that maximum number of dwelling units just for clarity for ease of use in

01:12:52.980 --> 01:12:57.880
 terms of not only city staff reviewing that not not having to maintain a list of what

01:12:57.880 --> 01:13:03.260
 percentage we're at but also for those in in consumers so it's just clear and understandable

01:13:03.260 --> 01:13:10.940
 for to apply we're also their request also would reduce that maximum percentage for three

01:13:10.940 --> 01:13:18.180
 car garages from 55 percent to 50 percent but limit the three car garages just to those

01:13:18.180 --> 01:13:23.760
 lot widths that are 62 feet wide and larger and we feel like this is is just clearer more

01:13:23.760 --> 01:13:28.580
 straightforward allows variation for building sizes and facades as we talked in the work

01:13:28.580 --> 01:13:35.540
 session that garage door width is pretty standard at 16 feet just allows for some variability

01:13:35.540 --> 01:13:43.780
 in the house size the width of the house giving that more diversity and design and it also

01:13:43.780 --> 01:13:48.260
 kind of removes that limitation once again for that clarity so there is specific criteria

01:13:48.260 --> 01:13:53.700
 for approval outlined in the 2002 Denton Development Code I won't read all this to you but we'll

01:13:53.700 --> 01:13:58.380
 just kind of talk through it briefly first preserve existing neighborhoods this request

01:13:58.380 --> 01:14:02.740
 is just specific to these this individual project it's not going to extend into other

01:14:02.740 --> 01:14:08.380
 neighborhoods and any visual impacts associated with it would be internal to this development

01:14:08.380 --> 01:14:13.980
 so it would be just contained within this development assure quality development that

01:14:13.980 --> 01:14:18.620
 fits in with the character of Denton apart from those deviations requesting all other

01:14:18.620 --> 01:14:25.060
 site design standards would apply for focus new development to activity centers to curb

01:14:25.060 --> 01:14:30.020
 strip development at urban straw sprawl once again this is just specific to this to this

01:14:30.020 --> 01:14:35.260
 development it's it's not going to extend out or increase the number of homes ensure

01:14:35.260 --> 01:14:38.980
 infrastructure is capable of comedy development this has gone through the platting process

01:14:38.980 --> 01:14:43.540
 so they've already demonstrated that the that the infrastructure is in place capacity

01:14:43.540 --> 01:14:50.100
 is there and they're going to be building the roads and sewers and water lines and ensure

01:14:50.100 --> 01:14:54.060
 that the developers alternative proposal results in a high quality development meeting the

01:14:54.060 --> 01:14:59.100
 intent of the standards so why do we have this why do we have these limitations on front

01:14:59.100 --> 01:15:04.700
 garages it's really to ensure that those garage doors don't overwhelm the front facade of

01:15:04.700 --> 01:15:09.020
 the residential homes think about maybe some homes you've seen where there have been really

01:15:09.020 --> 01:15:15.220
 large garages and it really is just to minimize that visual impact however some variations

01:15:15.220 --> 01:15:21.380
 can be appropriate to allow that diverse housing type also diversity in design and this is

01:15:21.380 --> 01:15:26.260
 really consistent with our comprehensive plan because our comprehensive plan encourages

01:15:26.260 --> 01:15:32.180
 diversity not only in housing types throughout the city but within communities to to have

01:15:32.180 --> 01:15:38.180
 dynamic places and diverse and diverse places with a variety of architectural styles and

01:15:38.180 --> 01:15:46.300
 and facades the proposed garage door is it'll provide additional design options for for

01:15:46.300 --> 01:15:53.340
 future residents and once again provide that diversity we are of course we want to make

01:15:53.340 --> 01:15:57.860
 sure that the visual impacts are addressed so that's where that setback comes in as well

01:15:57.860 --> 01:16:03.500
 as the as well as the reduced width of the of the three car garages and and the larger

01:16:03.500 --> 01:16:08.980
 lot size for the three car garages and then once again just removing that 45 cap just

01:16:08.980 --> 01:16:14.780
 to make sure it's real clear for for future buyers and and reviewers so with that staff

01:16:14.780 --> 01:16:24.220
 recommends approval of the request I'll be happy to answer any questions any questions

01:16:24.220 --> 01:16:35.180
 on this one okay so I just it kind of piggybacks on our questions in the work session so when

01:16:35.180 --> 01:16:41.380
 you push back the garage three feet are they taking away from the square footage of the

01:16:41.380 --> 01:16:48.060
 inside of the house number one number two will the square footage of the house still

01:16:48.060 --> 01:16:54.860
 fall within the city's guidelines the recommendations the requirements for this development and

01:16:54.860 --> 01:17:00.140
 then number three does that push back push the house back on the lot so you have you

01:17:00.140 --> 01:17:07.860
 know that final between the back of the house and the fence line does that affect that footage

01:17:07.860 --> 01:17:14.380
 there well I can answer so the city of Denton doesn't have a minimum lots or minimum single

01:17:14.380 --> 01:17:21.820
 family dwelling unit size so so we it it doesn't run afoul of any of those regulations in terms

01:17:21.820 --> 01:17:29.660
 of that setback this meets their their house designs so it is consistent with you know

01:17:29.660 --> 01:17:36.220
 what what they feel is is appropriate for the for their their buyers so I'm I'm I don't

01:17:36.220 --> 01:17:41.100
 know if it takes away from those individual homes but it is consistent with what they

01:17:41.100 --> 01:17:48.060
 intend to build out there and then in terms of the rear of the of the rear so we do have

01:17:48.060 --> 01:17:55.940
 a ten foot building line for rear lots in fact you could see it on this on this site

01:17:55.940 --> 01:18:00.180
 plan that's really consistent with with our residential districts throughout the city

01:18:00.180 --> 01:18:06.800
 and so any any property owner could build up to that ten foot building line I don't

01:18:06.800 --> 01:18:17.340
 know how many do but it is a possibility so did I answer the question okay good anything

01:18:17.340 --> 01:18:30.700
 else Commissioner Riggs so do I have to say the motion or can I just say make a motion

01:18:30.700 --> 01:18:37.500
 to approve as staff recommended and with the changes staff recommended Commissioner

01:18:37.500 --> 01:18:53.340
 for drone I second very well let's vote on the board and that passes for zero brings

01:18:53.340 --> 01:19:07.020
 us to our first public hearing item 5a PD 23 - 0 0 0 6 and I will open the public hearing

01:19:07.020 --> 01:19:36.900
 before we get carried away here how do we okay sorry all right here we go Julie Wyatt

01:19:36.900 --> 01:19:43.260
 principal planner and I am presenting PD 23 6 Family Justice Center all right so the request

01:19:43.260 --> 01:19:49.340
 before you is to rezone the property from our seven district to PD our seven district

01:19:49.340 --> 01:19:54.180
 to develop the site with a mixed use community facility to serve Denton County with a range

01:19:54.180 --> 01:19:59.980
 of services for persons and families experienced it experiencing domestic violence you could

01:19:59.980 --> 01:20:04.180
 see I want to talk about a couple maps on your screen first of all we'll talk about

01:20:04.180 --> 01:20:10.880
 the the large one so the property is located kind of on the north side of town on the east

01:20:10.880 --> 01:20:18.340
 side of Bonnie Bray just south of loop 288 and north of Windsor so it's it's in that

01:20:18.340 --> 01:20:23.740
 part of town there are a variety of uses surrounding it so we've got Denton High School across

01:20:23.740 --> 01:20:28.300
 Bonnie Bray we've got an elementary school under construction just to the northeast of

01:20:28.300 --> 01:20:35.340
 the south of the site there's a park just to the east and south of the property commercial

01:20:35.340 --> 01:20:41.420
 development along to loop 288 it's about a mile from the site and then we have a variety

01:20:41.420 --> 01:20:46.260
 of residential uses in the area we're ranging from single-family horizontal multifamily

01:20:46.260 --> 01:20:54.900
 to traditional multifamily town home so variety of residential uses there is Bonnie Bray is

01:20:54.900 --> 01:20:59.860
 a secondary arterial as well as Windsor is also a secondary arterial and then you've

01:20:59.860 --> 01:21:07.140
 got highway 77 to the north which is a primary arterial and then and then as I said the property

01:21:07.140 --> 01:21:14.500
 is zoned r7 and it's shown on your screen so we'll talk about the development plan that

01:21:14.500 --> 01:21:20.940
 they're proposing so as as you know a plan development is something where they can create

01:21:20.940 --> 01:21:25.980
 kind of that specialized zoning for the use especially if it's a unique use like the subject

01:21:25.980 --> 01:21:32.180
 like the property and the project it includes not only development standards but also a

01:21:32.180 --> 01:21:38.620
 development plan and these two things go hand-in-hand so as I mentioned the uses in work session

01:21:38.620 --> 01:21:44.500
 that the uses include residential it's a transitional housing there's a daycare administrative and

01:21:44.500 --> 01:21:50.900
 professional offices medical offices they have a pet kennel for residents on-site dining

01:21:50.900 --> 01:21:57.820
 so it's it's pretty comprehensive and what is included in the building and is designed

01:21:57.820 --> 01:22:02.580
 to the the building is designed to house all of these activities in this secure environment

01:22:02.580 --> 01:22:07.300
 and you could see kind of on your screen it has a kind of a wagon wheel look to it the

01:22:07.300 --> 01:22:14.260
 building is highlighted in yellow and it creates that that wheel with the with the the social

01:22:14.260 --> 01:22:21.660
 space the plaza area in the center there are there's a security gating on a portion of

01:22:21.660 --> 01:22:28.420
 the property and then as we talked about in in work session there are our three access

01:22:28.420 --> 01:22:34.580
 points emergency access to the north connects to that bus loop for the elementary school

01:22:34.580 --> 01:22:40.540
 and then two full access points to the south as well as you could see the the purple on

01:22:40.540 --> 01:22:45.420
 your screen those are pedestrian walkways throughout the site also connecting to the

01:22:45.420 --> 01:22:49.820
 to the park property to the east which will connect to a future trail and on to the elementary

01:22:49.820 --> 01:22:59.540
 school to allow safe route for school for for any children who might be using this facility

01:22:59.540 --> 01:23:04.900
 there's also a landscape plan associated with it right now the property is pretty flat there

01:23:04.900 --> 01:23:10.460
 aren't any trees on the site if you're familiar with bonnie bray you know there's some pretty

01:23:10.460 --> 01:23:17.260
 tall power lines running along the east side of bonnie bray so that kind of informed their

01:23:17.260 --> 01:23:22.580
 landscape plan especially along bonnie bray and that we've got some berms and some naturalized

01:23:22.580 --> 01:23:27.860
 prairie area along that we don't want any trees within that that utility line easement

01:23:27.860 --> 01:23:33.360
 so it'll just provide that naturalized area as a gate as a kind of a front door trees

01:23:33.360 --> 01:23:37.540
 throughout the parking area street trees along the park access road which is on the south

01:23:37.540 --> 01:23:44.820
 side they also have a dog yard and dogway station in the secure area for the residents

01:23:44.820 --> 01:23:49.940
 so with any project we look at the comprehensive plan first to see what it says in this instance

01:23:49.940 --> 01:23:54.180
 this proposal conforms to the vision and goals of the comprehensive plan to provide those

01:23:54.180 --> 01:23:59.460
 community programs to meet the the needs of underserved groups in denton also provide

01:23:59.460 --> 01:24:05.060
 needs for neighborhood and social services within the community it's also consistent

01:24:05.060 --> 01:24:09.460
 with our moderate density residential future land use designation which is what the property

01:24:09.460 --> 01:24:14.300
 is designated and it provides that community service to support residents in an appropriate

01:24:14.300 --> 01:24:19.380
 location since this is on an arterial it really is that appropriate location for this this

01:24:19.380 --> 01:24:24.700
 a little more intensive use that this institutional use bonnie bray being that arterial roadway

01:24:24.700 --> 01:24:32.300
 it provides that adequate access as well as supports that scale of development we also

01:24:32.300 --> 01:24:38.700
 analyze the use the design and location the proposed uses within this plan are intended

01:24:38.700 --> 01:24:45.740
 to support the organization's mission i did want to point out that this is a plan development

01:24:45.740 --> 01:24:51.340
 and so the plan development establishes the permitted use and development scale within

01:24:51.340 --> 01:24:57.260
 it's not tied to necessarily the user it's tied to the land so any user could come in

01:24:57.260 --> 01:25:05.100
 if this is approved and and and use these development standards for their for their

01:25:05.100 --> 01:25:09.860
 development but i did want to let you know that we have an amendment process within the

01:25:09.860 --> 01:25:15.460
 denton development code so any any substantial change to the mix of uses on the side or the

01:25:15.460 --> 01:25:21.020
 scale of development or changes to substantial changes to the site plan would require that

01:25:21.020 --> 01:25:25.860
 development to come back through the planning and zoning and city council approval processes

01:25:25.860 --> 01:25:33.340
 all over again so that's part of that pd process the design of the site balances that safety

01:25:33.340 --> 01:25:39.540
 with those with the aesthetics so that the as as a development it meets all of our development

01:25:39.540 --> 01:25:44.460
 standards for commercial or institutional buildings so that it will it will it will be

01:25:44.460 --> 01:25:50.620
 developed in in a manner in which we typically see for commercial and institutional buildings

01:25:50.620 --> 01:25:55.780
 and it is nearby that residential commercial and institutional growth and so that proximity

01:25:55.780 --> 01:26:01.940
 to schools and services and residential will be will provide those opportunities for residents

01:26:01.940 --> 01:26:08.820
 within within the project providing things like employment shopping as well as residential

01:26:08.820 --> 01:26:15.820
 opportunities if and when they move out of the facility and then there are upcoming improvements

01:26:15.820 --> 01:26:21.260
 to north bonnie bray street which will improve the experience for all users especially those

01:26:21.260 --> 01:26:27.700
 who are right now trying to get to denton high school on a daily basis so the improvements

01:26:27.700 --> 01:26:33.100
 to bonnie bray are coming public outreach was sent out we've received one letter in

01:26:33.100 --> 01:26:38.860
 support of the proposal it's just the property to the north and so based upon the criteria

01:26:38.860 --> 01:26:45.260
 for approval staff recommends approval of the request we have an anticipated council

01:26:45.260 --> 01:26:48.420
 date of march 25th if it moves forward from the planning and zoning commission i'll be

01:26:48.420 --> 01:26:52.500
 happy to answer any questions and the applicant is here and i do believe they have a presentation

01:26:52.500 --> 01:27:05.460
 as well any questions for staff okay thanks thank you i have a card from the applicant

01:27:05.460 --> 01:27:13.020
 representative amy bissett good evening commissioners chair pruett nice to see you all i'll introduce

01:27:13.020 --> 01:27:19.980
 myself while i open my slides amy bissett with 97 land company we are a local development

01:27:19.980 --> 01:27:25.060
 consultant with those of you who are new and haven't seen us here yet before we're on the

01:27:25.060 --> 01:27:30.220
 square next door to cartwrights and we're frequent flyers here so you'll see us on a

01:27:30.220 --> 01:27:38.500
 regular basis and i just i want to open by saying that our client tony johnson simpson

01:27:38.500 --> 01:27:42.740
 who is the executive director for denton county friends of the family is here and it's her

01:27:42.740 --> 01:27:48.180
 birthday so be nice to her please she and i are going to tag team this a little bit and

01:27:48.180 --> 01:27:52.020
 she's going to get up and speak as well i want to start with a little bit of um just

01:27:52.020 --> 01:27:57.860
 context for for this proposal um we've been working on this plan development since 2023

01:27:57.860 --> 01:28:05.180
 we've been through seven rounds of reviews with city staff and um the land has been donated

01:28:05.180 --> 01:28:10.780
 to the non-profit organization by the razor family and just recently within the last 30

01:28:10.780 --> 01:28:16.420
 days denton county um awarded a grant amount of eight million dollars to construct this

01:28:16.420 --> 01:28:22.980
 facility so um it's getting a lot of traction quickly and i'm honored to be here representing

01:28:22.980 --> 01:28:30.940
 it tonight and um appreciate your time i will not review the location map other than to

01:28:30.940 --> 01:28:37.020
 re-emphasize um the proximity to north lakes park as well as denton high school and the

01:28:37.020 --> 01:28:41.300
 elementary school that is under construction today that i'll talk a little bit more about

01:28:41.300 --> 01:28:48.940
 in a little bit um we are maintaining the base zoning district of r7 and um proposing

01:28:48.940 --> 01:28:55.380
 some plan development standards to layer on top of that to enhance um the the overall

01:28:55.380 --> 01:29:04.700
 campus um and and to basically set a higher standard for for the development it is uh

01:29:04.700 --> 01:29:08.940
 the future land use is moderate residential julie reviewed that and how this proposal

01:29:08.940 --> 01:29:14.940
 is consistent with the future land use plan and we are proposing the plan development

01:29:14.940 --> 01:29:20.020
 with the purpose to be facilitating a mixed use campus for comprehensive services for

01:29:20.020 --> 01:29:25.440
 denton county friends of the family this does include both both residential and non-residential

01:29:25.440 --> 01:29:31.620
 uses and and i will walk you through the site plan in a little more detail than julie did

01:29:31.620 --> 01:29:37.260
 just so you can kind of see how it's going to function and lay out

01:29:37.260 --> 01:29:42.540
 i i want to point this out first this is another view of the campus um i want to note a couple

01:29:42.540 --> 01:29:48.620
 of things to note here um the buildings are designed um to be connected between each other

01:29:48.620 --> 01:29:56.300
 to to create a security uh sense of security for the residents and the central courtyard

01:29:56.300 --> 01:30:02.860
 is secured as well and will include a number of residential amenities so let me walk you

01:30:02.860 --> 01:30:07.260
 through the details of the site plan here quickly um everything that you see highlighted

01:30:07.260 --> 01:30:13.500
 in blue is a non-residential use we have um client services partner services training

01:30:13.500 --> 01:30:20.100
 child care kitchen and admin offices an event hall and a pet kennel as um julie pointed

01:30:20.100 --> 01:30:25.620
 out i do want to say something a little more about that um families that are in this situation

01:30:25.620 --> 01:30:31.900
 and needing to seek help often will be reluctant to do so because of having to leave pets behind

01:30:31.900 --> 01:30:37.020
 and so this is an important component of this development to have pet services available

01:30:37.020 --> 01:30:46.100
 and a very um an amenitized and large dog park for for that um specific um need in the

01:30:46.100 --> 01:30:52.620
 community i also want to point out here um everything outlined in red that you see is

01:30:52.620 --> 01:30:58.800
 a security fence so essentially what happens is that um everything behind the security

01:30:58.800 --> 01:31:05.120
 fence is is designed to be accessed by residents and staff only and then um and so the the

01:31:05.120 --> 01:31:11.100
 back side of the parking lot is secured and fenced off and those those fencing connections

01:31:11.100 --> 01:31:17.660
 connect to buildings to provide um fully secured site and then the the buildings that are closer

01:31:17.660 --> 01:31:24.820
 to bonnie bray are those that um non-residents would come in to receive services or um there

01:31:24.820 --> 01:31:32.100
 may be other types of meetings that are held there

01:31:32.100 --> 01:31:36.340
 here's another version of this that's done by phasing um you'll see phase one to the

01:31:36.340 --> 01:31:42.360
 bottom right is in blue and that is um residential services a small admin office and kitchen

01:31:42.360 --> 01:31:48.460
 and dining um phase two is on the north side and that is all residential um phase three

01:31:48.460 --> 01:31:54.900
 is the majority of the non-residential uses and then phase four is the um community recreation

01:31:54.900 --> 01:32:01.700
 center or event center i i also want to point out two things that i think julie covered to

01:32:01.700 --> 01:32:08.140
 an extent um on the north side the access point is emergency access only that was determined

01:32:08.140 --> 01:32:13.660
 in multiple meetings and collaboration with the isd to make sure that their bus lane was

01:32:13.660 --> 01:32:19.220
 free and clear and was not conflicting with any of our traffic and so we'll have a public

01:32:19.220 --> 01:32:24.820
 access easement for fire and emergency personnel to access the site from that location but

01:32:24.820 --> 01:32:31.660
 all other traffic will be directed to the park road that is um it is dedicated right

01:32:31.660 --> 01:32:36.100
 of way on the south side and the development will be dedicating right of way as well to

01:32:36.100 --> 01:32:42.180
 expand that park road fire access there is an emergency fire access that will be available

01:32:42.180 --> 01:32:46.540
 to get to the interior courtyard if necessary on the south side of the building it will

01:32:46.540 --> 01:32:54.020
 be gated and and have a knocks box lock on it as well

01:32:54.020 --> 01:32:57.420
 back up just a minute i missed one of these i want to talk about the permitted land uses

01:32:57.420 --> 01:33:03.220
 here um so the the planned development standards list out what land uses will be permitted

01:33:03.220 --> 01:33:08.100
 and which will not be permitted and of the land uses that will be permitted housing child

01:33:08.100 --> 01:33:14.740
 care admin offices dining hall recreation medical office kennel vet clinic laundry service

01:33:14.740 --> 01:33:18.700
 the only things that are not permitted there by right today are your kennel and your vet

01:33:18.700 --> 01:33:24.500
 clinic and these would be only for residential use and then the self-service laundry would

01:33:24.500 --> 01:33:30.080
 if it was a standalone use would require a specific use permit all other land uses are

01:33:30.080 --> 01:33:37.220
 prohibited within the within the pd standards and we do have a an extensive amenity plan

01:33:37.220 --> 01:33:42.260
 that includes a dog park pollinator gardens uh two playgrounds one for the child care

01:33:42.260 --> 01:33:49.940
 facility one for residential um area uh lawn and picnic area seating plaza splash pad and

01:33:49.940 --> 01:33:53.860
 which is the only piece that will be built in phase two everything else will be built

01:33:53.860 --> 01:34:02.020
 in phase one and a staff grilling area here's a rendering of an interior courtyard uh just

01:34:02.020 --> 01:34:07.420
 a couple of highlights on the pd standards there's a 52 foot maximum building height

01:34:07.420 --> 01:34:13.540
 this is um equates to three stories is essentially what we're proposing uh 25 minimum landscape

01:34:13.540 --> 01:34:20.340
 um 35 minimum tree canopy and we are proposing the alternative landscape um for bonnie bray

01:34:20.340 --> 01:34:25.300
 because we can't plant trees in that very large um transmission easement and then we

01:34:25.300 --> 01:34:30.820
 have an exemption to exterior lighting restrictions there's a provision in the code that that

01:34:30.820 --> 01:34:36.260
 with residential uses your parking lot lighting can't um can't illuminate the residences

01:34:36.260 --> 01:34:42.660
 and we have written that out of this code for additional security purposes we did attempt

01:34:42.660 --> 01:34:47.020
 neighborhood engagement we sent out invitations for four neighborhood meetings over the course

01:34:47.020 --> 01:34:52.700
 of a year but we did not receive any responses um we did meet in person with denton isd and

01:34:52.700 --> 01:34:57.260
 coordinated with them on the driveways traffic routes and civil plans and we've met with

01:34:57.260 --> 01:35:01.620
 the parks department to provide the trail connection um for the residents to be able

01:35:01.620 --> 01:35:08.740
 to access north lakes park directly um preliminary drainage plans i'm not going to go into any

01:35:08.740 --> 01:35:13.420
 detail on this or traffic study recommendations but if you have specific questions about it

01:35:13.420 --> 01:35:17.460
 then i will um i'll come back up for that but i'd like to have tony come up and speak

01:35:17.460 --> 01:35:34.980
 a little more broadly about the organization thank you

01:35:34.980 --> 01:35:38.660
 thank you commissioners my name is tony johnson simpson i've served as the executive director

01:35:38.660 --> 01:35:42.900
 of denton county friends of the family for 20 years um the agency has existed since uh

01:35:42.900 --> 01:35:49.220
 1980 we'll celebrate our 45th year in service this year we currently operate um a variety

01:35:49.220 --> 01:35:52.860
 of facilities in the community and what happens with the family justice center is it means

01:35:52.860 --> 01:35:57.940
 that all those locations will really come together under one location that provides

01:35:57.940 --> 01:36:02.300
 those people who are accessing our services the opportunity to come to one location receive

01:36:02.300 --> 01:36:07.540
 services but telling their story one time allows for partner um community agencies law

01:36:07.540 --> 01:36:17.380
 enforcement officers and different organizations to also be under the same collaborative campus

01:36:17.380 --> 01:36:21.860
 reduces uh as we said as i said reduces the number of times that a victim needs to tell

01:36:21.860 --> 01:36:27.300
 their story and really increases the uh access that they have um for those families that

01:36:27.300 --> 01:36:32.420
 are in need of our services so we talk about what is this what is the problem the problem

01:36:32.420 --> 01:36:37.060
 here in denton county of course we have our some uh traffic issues um we have a county

01:36:37.060 --> 01:36:42.060
 that's growing very much so this ease is that issue for those families that are accessing

01:36:42.060 --> 01:36:49.740
 our services um it allows for them to be able to have the the cope of location of other

01:36:49.740 --> 01:36:54.580
 organizations that can also be there do it prevents duplication of services because we

01:36:54.580 --> 01:37:00.580
 don't have to have families going around to different organizations for that and amy shared

01:37:00.580 --> 01:37:05.980
 with you a picture of the preview of the campus that's the artist rendering and it looks beautiful

01:37:05.980 --> 01:37:10.520
 we expect for it to look very similar to that as we uh move into it we've taken a lot of

01:37:10.520 --> 01:37:15.060
 uh i guess the artist running doesn't demonstrate some of the security precautions that we've

01:37:15.060 --> 01:37:20.580
 taken with the property as we think about that of course our the security and safety

01:37:20.580 --> 01:37:27.580
 of our families and of our staff and our volunteers is at the utmost importance to us and we will

01:37:27.580 --> 01:37:32.420
 take all those efforts and measures that are necessary to do so if you have any questions

01:37:32.420 --> 01:37:46.580
 for us we'd love to have them any questions commissioner padron yes hi thank you so much

01:37:46.580 --> 01:37:50.500
 for your presentation um for the transitional housing how many clients would you be able

01:37:50.500 --> 01:37:56.740
 to support we're really talking about um at any one time about 40 families is going to

01:37:56.740 --> 01:38:01.180
 max out and they could be there from different amounts of time some people may need to stay

01:38:01.180 --> 01:38:05.500
 for a month or three months and others may need to stay for longer periods of time but

01:38:05.500 --> 01:38:10.140
 we look at family households then we're talking about about 40 households at a time thank

01:38:10.140 --> 01:38:20.060
 you max yes any other questions uh i have one it may be more for amy you mentioned the

01:38:20.060 --> 01:38:25.180
 street trees along bonnie bray were not able to be planted because of the electricity easement

01:38:25.180 --> 01:38:32.300
 um i when i look at the site plan it looks like there's about 20 25 feet between the

01:38:32.300 --> 01:38:38.240
 property line and where that easement starts am i reading the the plan wrong or or is there

01:38:38.240 --> 01:38:44.380
 a larger distance required if you um look at the exhibit above everything that's in

01:38:44.380 --> 01:38:49.540
 yellow here is within an easement so even our first row of parking is within the easement

01:38:49.540 --> 01:38:55.860
 all the way out to the existing bonnie bray um we really explored a number of options

01:38:55.860 --> 01:39:01.500
 for how we could potentially accommodate that including with the widening of bonnie bray

01:39:01.500 --> 01:39:07.220
 would we might be able to add trees at that point in time but with with that not being

01:39:07.220 --> 01:39:13.100
 imminent or or known um there's just the provision for an alternative landscape plan home we just

01:39:13.100 --> 01:39:19.900
 simply can't plant those trees along the street and i want to say that that entire width is

01:39:19.900 --> 01:39:25.980
 about 75 feet um and then we've got the same issue on the the other side of the development

01:39:25.980 --> 01:39:31.220
 where that everything outside of the security fence is a water line easement as well okay

01:39:31.220 --> 01:39:38.900
 thank you i don't see any other questions uh this is you're completed you're finished

01:39:38.900 --> 01:39:44.140
 okay thank you this is a public hearing i don't have any cards uh registered to speak

01:39:44.140 --> 01:39:51.300
 on this item but uh you may certainly come down and speak fill out a card later if you

01:39:51.300 --> 01:40:00.500
 have any comments on this item seeing nobody making a mad rush i will close the public

01:40:00.500 --> 01:40:10.220
 hearing uh and open it up for discussion or questions uh from the commission or a motion

01:40:10.220 --> 01:40:24.220
 if if anybody's so inclined commissioner padrone i move approval commissioner riggs yeah i

01:40:24.220 --> 01:40:29.500
 move approval and i just want to make a stick or second that sorry i don't make move um

01:40:29.500 --> 01:40:32.760
 but i do want to make a statement when we're looking at pds you know i think it's always

01:40:32.760 --> 01:40:38.780
 important to think of what can go in there for some reason this this were to go you know

01:40:38.780 --> 01:40:43.660
 just not come to fruition so kind of what what rights are we granting with that and

01:40:43.660 --> 01:40:49.060
 i don't have any problem with the additional rights that are being asked for yeah that's

01:40:49.060 --> 01:40:56.380
 a good point to keep keep in mind right as we grant rights through zoning changes what

01:40:56.380 --> 01:41:02.500
 uh what could happen so i i i share your thoughts commissioner riggs and uh with that i'll call

01:41:02.500 --> 01:41:11.980
 for a vote on the board

01:41:11.980 --> 01:41:17.900
 that passes four zero uh that brings us to our second public hearing for the evening

01:41:17.900 --> 01:41:34.860
 item 5b z25-0001 welcome erin good evening

01:41:34.860 --> 01:41:43.820
 erin stanley assistant planner i'll be presenting z25-0001 sequoia park rezoning so this is

01:41:43.820 --> 01:41:52.140
 a request to rezone um approximately 8.93 acres from r3 to r6 district generally located

01:41:52.140 --> 01:41:58.220
 north of mingo road and west of nonningham drive um the property is undeveloped and has

01:41:58.220 --> 01:42:03.100
 been since the early 1900s and the purpose is to facilitate residential development consistent

01:42:03.100 --> 01:42:08.740
 with the r6 standards there has been previous action on this property so it was final plotted

01:42:08.740 --> 01:42:15.980
 um back in 1958 and we will get into that in the next slide so you can see the part

01:42:15.980 --> 01:42:21.620
 of the final plot on the left side of the screen um includes the subject property the

01:42:21.620 --> 01:42:28.380
 original final plot was for approximately 40 acres and included this part of the subject

01:42:28.380 --> 01:42:38.260
 property in 1980 um two replats were approved so shown in yellow and in red that were adjacent

01:42:38.260 --> 01:42:46.980
 to this subject tract these replats the yellow portion did replat um we did realign the single

01:42:46.980 --> 01:42:52.900
 family lots there to change access to the subject property originally access would have

01:42:52.900 --> 01:42:58.380
 been taken off of shawnee street um and today that is not possible due to those residences

01:42:58.380 --> 01:43:02.740
 residences there but the property still has sufficient access which today would just be

01:43:02.740 --> 01:43:10.260
 taken off of mingo road whenever they come in to develop the property is currently zoned

01:43:10.260 --> 01:43:21.020
 r3 district and they are proposing r6 and so with all rezoning requests staff reviews

01:43:21.020 --> 01:43:26.660
 the general criteria for approval as well as the specific rezoning criteria um with

01:43:26.660 --> 01:43:32.820
 this the subject property the proposed the purpose of the rezoning is consistent with

01:43:32.820 --> 01:43:37.260
 the r6 purpose statement the proposal is also generally consistent with the comprehensive

01:43:37.260 --> 01:43:43.580
 plan goals and policies and the future and land use map designation uh it will be required

01:43:43.580 --> 01:43:47.900
 to comply with all ddc standards when they do come forward for development that's not

01:43:47.900 --> 01:43:53.180
 something we evaluate really with just the rezoning and then it is not expected to generate

01:43:53.180 --> 01:44:02.180
 any significant adverse environmental infrastructure or fiscal impacts so to start with consistency

01:44:02.180 --> 01:44:08.480
 with the r6 purpose statement uh the proposed zoning will is intended to accommodate a variety

01:44:08.480 --> 01:44:14.260
 of housing types and share existing character is maintained uh and serve as a transition

01:44:14.260 --> 01:44:19.420
 between established single family neighborhoods and adjacent commercial uses mixed uses and

01:44:19.420 --> 01:44:26.140
 key corridors those are the goals of r6 um the allowed uses within r6 would be single

01:44:26.140 --> 01:44:33.420
 family as well as townhome duplex triplex and fourplex uses and with evaluating the

01:44:33.420 --> 01:44:38.740
 request staff looks at these uses and sees what um their requirements for development

01:44:38.740 --> 01:44:44.660
 would be so with the checked items here so these uses would all still be required the

01:44:44.660 --> 01:44:51.180
 same architectural design as any single family home would be um things like covered front

01:44:51.180 --> 01:44:57.540
 porches or stoops or recessed entries those would all be required for these other types

01:44:57.540 --> 01:45:03.820
 of residential uses these would also all see internal street networks providing that neighborhood

01:45:03.820 --> 01:45:10.500
 character design um and and network throughout the subdivision and r6 would also provide

01:45:10.500 --> 01:45:16.020
 a buffer from mingo as well as the multi-family to the south and the uh religious private

01:45:16.020 --> 01:45:21.900
 school use to the east um this would be an appropriate buffer from that more denser dense

01:45:21.900 --> 01:45:32.300
 use to the single family to the north and west so with the uh future land use map this

01:45:32.300 --> 01:45:37.220
 property is designated as low residential and this is intended to prime predominantly

01:45:37.220 --> 01:45:42.380
 be single family neighborhoods up to five units per acre and have a distinct subdivision

01:45:42.380 --> 01:45:51.380
 development style um while r6 does allow slightly denser than five units per acre staff did

01:45:51.380 --> 01:45:57.700
 look at their surrounding area and the properties to the directly to the north um do have a

01:45:57.700 --> 01:46:04.860
 slightly denser pattern already than r3 does um it's not quite as dense as what is proposed

01:46:04.860 --> 01:46:10.180
 for r6 but it is closer to that it doesn't meet that uh five units per acre density that

01:46:10.180 --> 01:46:19.580
 of low residential and see this is also a unique um location having two other future

01:46:19.580 --> 01:46:25.540
 land uses designations in proximity so the moderate residential designation just to the

01:46:25.540 --> 01:46:32.060
 south um is intended to be a transition area and between single family neighborhoods and

01:46:32.060 --> 01:46:37.860
 mixed use or commercial areas and the pink shaded color of mixed use community mixed use

01:46:37.860 --> 01:46:42.620
 is also intended to have those supporting uses for residential be a bit higher density

01:46:42.620 --> 01:46:47.060
 mixed housing types so these are important things to consider um in evaluating their

01:46:47.060 --> 01:46:53.860
 quest and rezonings do not have to comply a hundred percent with their lower their future

01:46:53.860 --> 01:47:00.060
 land use designation um as long as they still further overall goals of the comprehensive

01:47:00.060 --> 01:47:06.580
 plan this is looked at more holistically so some of those goals that we will get into

01:47:06.580 --> 01:47:13.180
 the first one um is to grow compactly with in coordination with transportation and infrastructure

01:47:13.180 --> 01:47:18.540
 so the subject property is located at the corner of mingo and noddingham and our comprehensive

01:47:18.540 --> 01:47:24.340
 plan designates both of these streets as arterial roadways so arterial roadways are intended

01:47:24.340 --> 01:47:31.100
 to serve as major routes into and throughout the city um making this more of a place that's

01:47:31.100 --> 01:47:41.180
 more appropriate for that higher density um mixed type uses and in the 2023 bond mingo

01:47:41.180 --> 01:47:46.140
 improvements were approved including what you see here to have a continuous left turn

01:47:46.140 --> 01:47:53.620
 lane as well as a 10 foot side path that would run along the southern boundary of this property

01:47:53.620 --> 01:47:57.980
 and then some distances i'd like to point out um this is in very close proximity to

01:47:57.980 --> 01:48:03.900
 texas women's university it's about a 1.2 mile walk along mingo to get to the center

01:48:03.900 --> 01:48:11.060
 of twu campus and it's about a third of a mile walk to get to sequoia park that's outlined

01:48:11.060 --> 01:48:19.780
 in the in the upper right hand map the property also already does have public water and sewer

01:48:19.780 --> 01:48:28.140
 that already runs along or through the property two other goals um these two touch on the

01:48:28.140 --> 01:48:35.260
 need for diverse housing stock in terms of type cost and location and the first goal

01:48:35.260 --> 01:48:40.820
 specifically calls out the uses that are allowed in r6 as potentially compatible with single

01:48:40.820 --> 01:48:50.180
 family neighborhoods staff did send out notifications and notification uh or the signs were posted

01:48:50.180 --> 01:48:56.860
 on the property um we have received four responses in opposition within the 200 foot buffer uh

01:48:56.860 --> 01:49:02.580
 totaling 8.72 percent and the applicant did have a neighborhood meeting um last week in

01:49:02.580 --> 01:49:09.580
 which five people attended and he is here to speak as well with that staff is recommending

01:49:09.580 --> 01:49:13.900
 approval of the zoning change as it complies with the criteria for approval and i will

01:49:13.900 --> 01:49:25.700
 be happy to answer any questions any questions just just one i think we had a um a written

01:49:25.700 --> 01:49:31.100
 comment uh from the public that talked about please know multifamily here is multifamily

01:49:31.100 --> 01:49:37.700
 a permitted use within r6 no okay it would not be permitted okay thank you i will open

01:49:37.700 --> 01:49:46.900
 the public hearing because i think i failed to do that earlier i have a card from uh miss

01:49:46.900 --> 01:49:56.900
 nancy sorrels oh i'm sorry is you said the applicant is here um does the applicant wish

01:49:56.900 --> 01:50:06.260
 to speak or not um it doesn't look like there are any questions at the time if uh if you'd

01:50:06.260 --> 01:50:15.620
 like to to come up after the the public has an opportunity i think that'd be fine um okay

01:50:15.620 --> 01:50:21.620
 nancy sorrels please come down state your name and address for the record and then you'll

01:50:21.620 --> 01:50:30.140
 have four minutes to speak hello commissioners i'm nancy sorrels i live at 3501 rose lawn

01:50:30.140 --> 01:50:35.780
 drive i'm actually the current owner of this property i've had it under contract a number

01:50:35.780 --> 01:50:43.260
 of times but no one can develop it due to the zoning that it's in now and due to some

01:50:43.260 --> 01:50:48.780
 of the issues with the property with houses built places where maybe they don't belong

01:50:48.780 --> 01:50:55.220
 etc so i'm very much for this change in zoning and i'm hopeful that we'll be able to get

01:50:55.220 --> 01:51:01.940
 this accomplished i also sent in responses um in support but apparently it didn't make

01:51:01.940 --> 01:51:09.220
 it through the mail so um i've sent those in as well thank you thank you any questions

01:51:09.220 --> 01:51:18.500
 okay this is a public hearing if anybody would like to speak i do have one uh card in opposition

01:51:18.500 --> 01:51:25.220
 to this item uh not wishing to speak so that will be entered into the record in addition

01:51:25.220 --> 01:51:32.420
 to the the four properties that you saw in the presentation but it is a public hearing

01:51:32.420 --> 01:51:40.580
 if anybody has any thoughts to offer or questions for staff or the applicant feel free to come

01:51:40.580 --> 01:51:56.420
 forward not seeing any i will close the public hearing um any questions for staff or comments

01:51:56.420 --> 01:52:08.980
 um i guess i have one erin um as i look at the the gis map i don't see any isa's mentioned

01:52:08.980 --> 01:52:15.300
 but there is a creek drainage creek that runs through it yes i'm trying to understand obviously

01:52:15.300 --> 01:52:20.660
 not you know we're talking about a straight zoning change but when i look at that it looks

01:52:20.660 --> 01:52:26.100
 to me like you would have to take two points of access off of mingo in order to serve the

01:52:26.100 --> 01:52:33.700
 entire property is that a a reasonable conjecture um the applicant has looked at some some conceptual

01:52:33.700 --> 01:52:39.460
 plans and in conceptual plans the area that is east of it's a drainage easement um this

01:52:39.460 --> 01:52:45.700
 kind of shown here it's a 30 foot wide drainage easement so it is not isa okay um but in conceptual

01:52:45.700 --> 01:52:51.540
 plans they are preserving everything east uh you are correct it would take some some engineering

01:52:51.540 --> 01:52:56.900
 to get across that necessarily um but it could be possible okay thank you

01:52:59.620 --> 01:53:08.180
 any questions from the commission or a motion i do have a question yes it's commissioner for

01:53:08.180 --> 01:53:16.100
 staff so uh looking at the permitted uses going from r3 to r6 looks like town homes duplexes

01:53:16.100 --> 01:53:22.260
 triplexes and fourplexes are permitted uses are those on the table is part of what the

01:53:22.260 --> 01:53:28.580
 development's going to look like or um i will let the applicant answer that if you would like

01:53:28.580 --> 01:53:39.300
 perfect primarily there's two reasons we're looking for a zone change the first one is

01:53:39.300 --> 01:53:46.740
 r3 versus r6 in typical lot width and lot depth as well as lot size is a lot of bigger of a lot

01:53:46.740 --> 01:53:52.340
 in r3 so what we're hoping with r6 is even if we do single family for example we can do a typical

01:53:52.340 --> 01:53:58.020
 50 by 110 lot which is what home developers are looking for in terms of duplex triplex fourplex

01:53:58.020 --> 01:54:05.780
 that's not what we would do we would either go single family or town homes by a deed restriction

01:54:05.780 --> 01:54:10.660
 as well we can only do single family so that's single family sales so even if we did town homes

01:54:10.660 --> 01:54:15.540
 we couldn't necessarily do a bill to rent unless someone wanted to go in and buy every single

01:54:15.540 --> 01:54:19.220
 individual home which we can't stop them but they would have to be a for sale product

01:54:19.220 --> 01:54:25.780
 so if i understand right you're saying like a duplex or triplex would be

01:54:26.500 --> 01:54:31.380
 we could do like a twin home okay but we wouldn't yeah we wouldn't we wouldn't do something like that

01:54:31.380 --> 01:54:38.260
 okay and that that's because of the deed restrictions on the property currently not

01:54:38.260 --> 01:54:44.260
 because of the zoning correct correct yeah um also there's not really a big demand here for that

01:54:44.260 --> 01:54:50.340
 so we're looking more of individual for sale product for the for consumer okay uh commissioner

01:54:50.340 --> 01:54:57.700
 dyer so when you're talking about the rezoning would allow you to do smaller lots about how many

01:54:57.700 --> 01:55:04.340
 home sites can you fit on this property today based on current zoning based on if this got approved

01:55:04.340 --> 01:55:11.940
 oh and the smaller lots about 36 to 38 would be probably the most as erin pointed out there is a

01:55:11.940 --> 01:55:16.820
 drainage easement on top of that there's tree preservation that would have to be considered

01:55:17.380 --> 01:55:23.220
 buffers we were also working currently with traffic uh here they would like us to dedicate

01:55:23.220 --> 01:55:28.500
 about a 35 foot easement in the front for that future mingo expansion so there's a lot of things

01:55:28.500 --> 01:55:33.700
 adversely affecting this that would would shrink our yield down significantly okay thank you

01:55:33.700 --> 01:55:43.460
 any other questions okay thank you thank you

01:55:47.380 --> 01:55:51.460
 discussion or emotion

01:55:51.460 --> 01:56:01.940
 i don't necessarily have an issue if this is essentially the only way that the

01:56:01.940 --> 01:56:06.180
 property is going to be developed if others have tried and can't can't make it work

01:56:06.180 --> 01:56:11.460
 i don't necessarily have an issue with that it still remains single family so kind of my thoughts

01:56:13.220 --> 01:56:19.380
 okay commissioner dire but there's no guarantee i mean there's no guarantee that it would remain

01:56:19.380 --> 01:56:24.340
 single family because they could put town homes essentially they could put any of those up there

01:56:24.340 --> 01:56:32.260
 but in the end you know as the current property owner states she's attempted multiple times to

01:56:32.260 --> 01:56:37.380
 sell this and this sounds like it's probably the only way that the deal is going to get done

01:56:40.980 --> 01:56:45.780
 can i ask a question to staff just for clarification for the nearby residents

01:56:45.780 --> 01:56:52.340
 i think we we kind of jumped over the terminology of of what the zoning allows versus what the deed

01:56:52.340 --> 01:56:58.820
 restriction allows can you explain the difference between those and also what the process if you're

01:56:58.820 --> 01:57:04.900
 aware would be to change or remove the deed restriction because it doesn't come before us

01:57:04.900 --> 01:57:10.820
 is my understanding no it would not um staff does not regulate those deed restrictions that's more

01:57:10.820 --> 01:57:17.700
 private agreements with with the property owner and it would just be up to anyone another resident

01:57:17.700 --> 01:57:25.460
 to enforce that essentially and just report i guess um the process of changing those i would

01:57:25.460 --> 01:57:30.900
 you they would need to consult like a land use eternity attorney so not not us not this body

01:57:30.900 --> 01:57:35.220
 okay thank you commissioner padron

01:57:38.900 --> 01:57:44.100
 i just wanted to say that i agree with commissioner riggs um on uh just the context of the of the

01:57:44.100 --> 01:57:49.860
 property um the limitations with being able to move forward with it and then finding a way to

01:57:49.860 --> 01:58:00.100
 move forward with this proposal yeah i'll just say that i um i'm happy to see uh however many

01:58:00.100 --> 01:58:07.140
 homes that it would be go here instead of uh you know three miles away outside the loop creating

01:58:07.140 --> 01:58:11.620
 more traffic for the rest of our residents as they as they get to stores and that sort of thing

01:58:11.620 --> 01:58:21.780
 i'll entertain a motion if anybody has one commissioner padron move approval

01:58:21.780 --> 01:58:27.140
 commissioner riggs second and i will call for a vote on the board

01:58:35.060 --> 01:58:38.100
 and that passes four to zero thank you

01:58:38.100 --> 01:58:48.660
 that is our last public hearing brings us to item six a the planning and zoning commission project

01:58:48.660 --> 01:58:58.340
 matrix hayley that's good evening um just in terms of updates since our last meeting um city council

01:58:58.340 --> 01:59:03.460
 did meet last week and the coal ranch master plan community amendments that you all had considered

01:59:03.460 --> 01:59:08.260
 uh were approved i believe that was the only action that they took that directly related to

01:59:08.260 --> 01:59:13.380
 anything this body has been working on um and i don't believe we had any significant changes

01:59:13.380 --> 01:59:17.060
 to your matrix but i'm happy to add anything that you all might be interested in

01:59:25.460 --> 01:59:34.260
 i don't think this is something specifically um to be reported on uh but uh as we were doing our work

01:59:34.260 --> 01:59:41.780
 session uh earlier today we we saw that that the planning and zoning commission doesn't see uh

01:59:41.780 --> 01:59:52.900
 applications for um um admission into the city why can i not think of this word right now

01:59:52.900 --> 01:59:58.900
 annexation thank you uh uh and so we don't see those but sometimes we see zoning requests

01:59:58.900 --> 02:00:07.060
 after that um it might help us just to get some preview in the future if uh the council actions

02:00:07.060 --> 02:00:12.580
 would include any annexations in addition to to final action that they took on items we've

02:00:12.580 --> 02:00:17.380
 already seen certainly we can do that okay um and in the spirit of that i will say if you're

02:00:17.380 --> 02:00:22.900
 interested the last council meeting there were three uh projects that were requesting resolutions

02:00:22.900 --> 02:00:28.260
 in support of low income housing tax credits i anticipate if those are awarded at least one

02:00:28.260 --> 02:00:35.300
 of those will come before this body for a specific use permit request okay good to know uh

02:00:35.300 --> 02:00:42.660
 that brings us to our final item concluding items anyone have anything

02:00:45.060 --> 02:00:51.540
 excited for denton oh actually i do have something so so last friday i had the opportunity of going

02:00:51.540 --> 02:00:58.100
 to focus north texas uh actually you know accompanied staff to that that was really

02:00:58.100 --> 02:01:01.620
 really eye-opening and i would encourage anyone who gets a chance to go next year

02:01:01.620 --> 02:01:12.020
 very good uh and and i have oh commissioner dire thank you all for being so welcoming um to me on

02:01:12.020 --> 02:01:18.100
 my very first meeting thank you for being here with us we uh we look forward to learning together

02:01:18.100 --> 02:01:25.460
 so thank you um i do have one and i'm looking up the date to make sure that i don't misstate it

02:01:25.460 --> 02:01:33.540
 um it is not this saturday but next saturday uh afternoon is the winter warmer

02:01:33.540 --> 02:01:41.300
 um have some some staff and others that are very involved in supporting this fundraiser for

02:01:42.020 --> 02:01:49.540
 our students here in town so look that up and please attend and and uh it's a great time so

02:01:49.540 --> 02:01:56.180
 with that with no objection i will uh

02:01:56.180 --> 02:02:05.860
 adjourn our meeting of the planning and zoning commission at 7 31 p.m thank you