 Okay. Sorry, Billy. All right. Here we go. All right. Hello. Good morning and welcome

00:00:09.080 --> 00:00:17.380
 to the city of public utility board meeting of Monday, February 24th, 2025. We will start

00:00:17.380 --> 00:00:22.060
 with the regular meeting and then we're going to pause. Are there any presentations from

00:00:22.060 --> 00:00:33.120
 members of the public? Nothing? Okay. There is none. We have the consent agenda, which

00:00:33.120 --> 00:00:37.560
 we're going to pause here for a moment and give Mr. Ryback a few minutes. If he doesn't

00:00:37.560 --> 00:01:06.800
 show, we'll get going. She said, yeah, she said we can, but we can we go on with the

00:01:06.800 --> 00:01:11.640
 meeting. I mean, I'd like to give Lee a few minutes. I mean, you can also just wait. Yeah.

00:01:36.800 --> 00:02:04.600
 Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay.

00:02:04.600 --> 00:02:32.400
 Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay.

00:02:32.400 --> 00:03:00.600
 Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay.

00:03:00.600 --> 00:03:27.800
 Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay.

00:03:27.800 --> 00:03:55.800
 Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay.

00:03:55.800 --> 00:04:14.800
 Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay.

00:04:14.800 --> 00:04:29.800
 Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay.

00:04:29.800 --> 00:04:44.800
 Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay.

00:04:44.800 --> 00:05:10.800
 Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay. Okay.

00:05:10.800 --> 00:05:15.360
 money that capacity up this is a 20-year facility it's 20-year money so it makes

00:05:15.360 --> 00:05:20.400
 sense to finish this up closed out that bond and then we can start new capacity.

00:05:20.400 --> 00:05:40.100
 I think it's an excellent use of the funds. I wasn't suspicious about it. I just like this line item number and what is it that's bond money that's great and the second part of my inquiry is so this thing's gonna be a washing system. Correct. So I'm assuming it's under carriage wash, it's gonna flush down, what's gonna happen to the wastewater?

00:05:40.100 --> 00:05:59.120
 The water, it's a recirculation system so basically it's a series of troughs and weirs so water you know wants it under, currently what we have is basically a mud shaker which is a glorified cattle guard. The trucks go over it, drops a lot of mud off of it but it's still very dirty when they leave the landfill.

00:05:59.120 --> 00:06:28.880
 Under carriage wash basically high-pressure water goes up washes all the mud out from underneath it. That water drains into this this weird system and with the gravity and just the flow of water the solids drop out and then we reuse the water so it just keeps recirculating. It's like a gray water system. Yeah it's a gray water system and then you know when the when it's dry we don't have to worry about the mud that we can drain the system let the solids dry we can pull that out use it for cover whatever else we want to do. Okay so you're gonna

00:06:28.880 --> 00:06:58.820
 take that mud essentially yes once it's dry and put it back into the landfill? On top of the landfill correct. Yes. Well those are my questions thank you very much. Thank you. Anybody else feel free. No history with my mind if I remember this correctly it was this is why we only built the lower end wheel wash system before because we knew we'd be having to replace it in a few years. That is correct but again the the lower end that we had

00:06:58.820 --> 00:07:03.140
 previously was still a 12 or 15 year system so we got a lot of life out of it.

00:07:03.140 --> 00:07:06.420
 Currently you know we're operating in the area where the old wheel wash was.

00:07:06.420 --> 00:07:12.620
 It's time for us to put the new one in. Okay great. So the board the chair will

00:07:12.620 --> 00:07:19.500
 entertain a motion. We have a motion from Mr. Ryback and a second from Mr. Rainer.

00:07:19.500 --> 00:07:25.100
 All those in favor please say aye. Aye. Any opposed sign the same. Passes

00:07:25.100 --> 00:07:29.660
 unanimously. Moving on. Thank you. Thank you Brian. Moving on to items for

00:07:29.660 --> 00:07:34.420
 individual consideration. Item A which is the consider of the approval of the

00:07:34.420 --> 00:07:42.980
 February 10th 2025 minutes. Is there a motion to approve? We have a motion do

00:07:42.980 --> 00:07:50.420
 we have a second? We have a second from Mr. Nukus. All those in favor please say

00:07:50.420 --> 00:07:57.100
 aye. Aye. Any opposed sign the same. Passes unanimously. Moving on to item C

00:07:57.100 --> 00:08:26.300
 PUB 25-021. This is the one where I'm gonna walk out. Good morning board members.

00:08:26.300 --> 00:08:31.020
 Scott Fedig senior project manager with Capital Projects. Here this morning for

00:08:31.020 --> 00:08:36.300
 consideration of a construction phase contract for neighborhood 1B which is a

00:08:36.300 --> 00:08:42.340
 construction manager at risk or CMAR project. Neighborhood 1B is part of the

00:08:42.340 --> 00:08:50.980
 2019 bond program. A little bit of a project overview. This project does take

00:08:50.980 --> 00:08:56.500
 place primarily in the northeast quadrant of the city. With this project

00:08:56.500 --> 00:09:01.380
 we're gonna be placing about 25,000 feet of roadway. Looking to do about 10,000

00:09:01.380 --> 00:09:05.500
 feet of water main replacement. Around 17,000 feet of wastewater replacement.

00:09:05.500 --> 00:09:13.740
 We'll be replacing sidewalks as needed and then also some street lighting. So a

00:09:13.740 --> 00:09:19.140
 little bit about the GMP or guaranteed maximum price process. Neighborhood 1B

00:09:19.140 --> 00:09:24.620
 was broke up into seven different work categories and then those categories

00:09:24.620 --> 00:09:30.100
 were publicly bid by the CMAR for pricing. Once we got those bids back the

00:09:30.100 --> 00:09:34.860
 CMAR along with the City of Denton evaluated all the firms. We selected the

00:09:34.860 --> 00:09:40.060
 highest ranking firms to confirm scope as well with pricing and then

00:09:40.060 --> 00:09:45.940
 provide lump sum packages. Once that was provided Sunt Construction or the CMAR

00:09:45.940 --> 00:09:50.660
 provided a guaranteed maximum price based on the subcontractors bids that

00:09:50.660 --> 00:09:54.820
 we were given along with general condition cost, bonds and insurance and

00:09:54.820 --> 00:10:02.660
 then also the CMAR's contingency and the contractors fee. So cost summary. Total

00:10:02.660 --> 00:10:08.020
 cost of work you can see was just over 23 million. Sunt did win some of the work

00:10:08.020 --> 00:10:13.460
 there as you can see. We also had Jayco Public winning asphalt paving and paving

00:10:13.460 --> 00:10:17.940
 marked with altus and then we had greenscaping for sodding and seating. We

00:10:17.940 --> 00:10:22.140
 had just over 1.1 million dollars worth of allowances for this project. One thing

00:10:22.140 --> 00:10:26.220
 to note on our allowances any of that money that is not used will revert back

00:10:26.220 --> 00:10:30.380
 to the city as a cost savings for the project. Overall project came in just

00:10:30.380 --> 00:10:38.780
 over 30 million dollars. Schedule started this process with the pre-construction

00:10:38.780 --> 00:10:43.740
 services and design phase services in July of 2023. That was a 21 month

00:10:43.740 --> 00:10:49.820
 duration overall. With approval here today and City Council on March 4th we

00:10:49.820 --> 00:10:54.660
 project to start construction in April and then have a project completion in

00:10:54.660 --> 00:11:02.660
 October of 2026. With that staff recommendation is for an approval for a

00:11:02.660 --> 00:11:06.740
 construction contract between City of Denton and Sunt Construction and

00:11:06.740 --> 00:11:10.780
 then not to exceed amount of 31 million eight hundred and seventy two thousand

00:11:10.780 --> 00:11:14.380
 five hundred seventy dollars and two cents. That does include our owner's

00:11:14.380 --> 00:11:19.220
 contingency of nine hundred thousand dollars. And with that I'll open up for

00:11:19.220 --> 00:11:26.980
 any questions. So this is an awful lot of work. Yes sir. What is the life

00:11:26.980 --> 00:11:31.740
 expectancy of a project like this once you've completed it? Ten years, twenty

00:11:31.740 --> 00:11:37.060
 years, thirty years. Yeah so is there a number? I don't know. I'm just curious. So life

00:11:37.060 --> 00:11:42.820
 expectancy for a street between 30 to 50 years depending on how it holds up but

00:11:42.820 --> 00:11:47.140
 but yeah that's at least that long. And then the infrastructure that goes with

00:11:47.140 --> 00:11:51.860
 it? Same if not longer. Typically the PVC that's put in the ground sometimes will

00:11:51.860 --> 00:11:56.180
 last even longer than that. Thank you.

00:11:56.180 --> 00:12:02.860
 Do you have one? You go. Could you go back to the map for me? Sure.

00:12:02.860 --> 00:12:16.380
 To dovetail with you Mr. Ryback. That's a lot of roads. Yes sir. Yep. There are about

00:12:16.380 --> 00:12:21.620
 45 street segments. Some of the major streets in that that are in pretty bad

00:12:21.620 --> 00:12:24.940
 need of that. Redstone. I don't know if you've been up in that area. Hercules.

00:12:24.940 --> 00:12:29.340
 That road is in pretty dire shape for some repair along with Juneau, Neptune,

00:12:29.340 --> 00:12:34.100
 all those connecting streets. Yellowstone is also needing some some major help and

00:12:34.100 --> 00:12:39.700
 it's in this package as well. So like the Royal Acres, Wellington area and then

00:12:39.700 --> 00:12:44.660
 we'll also be doing a Nottingham and then which is kind of down there at the

00:12:44.660 --> 00:12:49.900
 bottom running east and west just south of Windsor. Yep and then another one

00:12:49.900 --> 00:12:55.420
 that's the Dell, Riney area right there. And is the one down on the bottom right

00:12:55.420 --> 00:13:00.900
 corner that you just is that part of the is that off of Emerson? The this this

00:13:00.900 --> 00:13:04.140
 section here? No I was looking further over to your right. Oh that's out of this

00:13:04.140 --> 00:13:07.660
 that's out of the quadrant nevermind. Yes sir that'll be a different project.

00:13:07.660 --> 00:13:14.740
 Thank you. Yes sir. So as we evaluate these CMAR projects we kind of talked

00:13:14.740 --> 00:13:17.780
 about this before more just for edification than anything. We've got a

00:13:17.780 --> 00:13:22.820
 31 million dollar project CMARD by Sunt who's performing 18 and a half

00:13:22.820 --> 00:13:26.460
 million of that project so the lion's share. Which may sound like a criticism

00:13:26.460 --> 00:13:34.780
 however I guess I would ask am I reasonable then to say as a positive by

00:13:34.780 --> 00:13:38.900
 performing that much work it's more likely they'd be able to tie into their

00:13:38.900 --> 00:13:45.580
 own things right they're performing the work and perhaps provide an efficiency as

00:13:45.580 --> 00:13:50.820
 far as cost savings on top of that in addition to time savings i.e. hoping we

00:13:50.820 --> 00:13:56.980
 get done on time and below budget is that a pretty is this a pretty good

00:13:56.980 --> 00:14:01.740
 example of why we're CMARing these projects now? Yes absolutely and then you

00:14:01.740 --> 00:14:06.780
 said them being in control of more of that is does allow them to expedite on

00:14:06.780 --> 00:14:11.220
 schedule you're not relying on your subs to follow in behind you to do the work

00:14:11.220 --> 00:14:15.500
 we've seen with neighborhood two and six which is also a CMAR that Sunt's

00:14:15.500 --> 00:14:19.520
 performing that we've had excellent results with them you know performing

00:14:19.520 --> 00:14:23.260
 that work staying ahead of schedule actual cost savings you know we're

00:14:23.260 --> 00:14:27.540
 seeing close to half a million dollars coming back for our first GMP with that

00:14:27.540 --> 00:14:30.540
 package going to be coming back to the city with cost savings with you know

00:14:30.540 --> 00:14:35.380
 between contingency fee and allowances so we're seeing some really good results

00:14:35.380 --> 00:14:39.860
 as well as the constructability and the product that they're putting out. Sounds

00:14:39.860 --> 00:14:42.580
 good thank you very much.

00:14:42.580 --> 00:14:59.500
 Thank you so much all in favor of this sign the same motion or entertain a

00:14:59.500 --> 00:15:08.500
 motion I apologize. Second. Second. All in favor aye. Opposed? Have it

00:15:08.500 --> 00:15:13.300
 unanimously. Thank you.

00:15:39.100 --> 00:15:46.620
 Yes item Dean. PUB 25-022 consider recommending adoption of orders to the

00:15:46.620 --> 00:15:49.860
 city of Denton to Texas home rule municipal corporation authorizing the

00:15:49.860 --> 00:15:54.740
 city manager to execute execute contract with Romco equipment. Good morning Tom

00:15:54.740 --> 00:16:00.540
 Gramer director of facilities and fleet services. Looking for a Romco cooperative

00:16:00.540 --> 00:16:04.380
 contract the city of Denton fleet services we purchase repair and

00:16:04.380 --> 00:16:08.060
 maintain and rent various types of oval construction equipment utilized by

00:16:08.060 --> 00:16:11.780
 several departments that support city services construction equipment is

00:16:11.780 --> 00:16:14.860
 utilized by the multiple departments to provide various services including the

00:16:14.860 --> 00:16:19.740
 bulk material movement by loaders and excavators. The proposed contract allows

00:16:19.740 --> 00:16:23.260
 for the purchased rental and repair of assets utilized by these departments

00:16:23.260 --> 00:16:27.700
 such as beneficial reused wastewater drainage and solid waste. The repair

00:16:27.700 --> 00:16:31.620
 services provided by this contract ensure that all these assets remain up

00:16:31.620 --> 00:16:35.940
 and running utilizing specialized diagnostic equipment the technical

00:16:35.940 --> 00:16:40.060
 knowledge and the OEM support. All vehicle acquisitions will be processed

00:16:40.060 --> 00:16:43.780
 through the city's budgeting processes and the city is only paying for services

00:16:43.780 --> 00:16:48.460
 rendered and is not obligated to pay the full contract amount unless needed. Here

00:16:48.460 --> 00:16:52.020
 there's graph breakdowns of exactly where the money is being spent who is

00:16:52.020 --> 00:17:00.780
 utilizing it per fund type. On the right hand side of the screen you'll see a

00:17:00.780 --> 00:17:07.380
 acquisition example 2024 we purchased a large wheel loader about $330,000 so you

00:17:07.380 --> 00:17:12.900
 can see the magnitude of each piece of equipment. Staffs recommendation is to

00:17:12.900 --> 00:17:16.020
 approve a one-year contract with four additional one-year extensions in the

00:17:16.020 --> 00:17:20.020
 total of five year not to exceed amount with Romco. Romco equipment for five

00:17:20.020 --> 00:17:27.860
 million three and thirteen thousand dollars total. Any questions? Okay. Is any

00:17:27.860 --> 00:17:31.580
 of this equipment utilized in departments outside this board's purview

00:17:31.580 --> 00:17:35.420
 and if so we have inter-department financial transfers that happen to

00:17:35.420 --> 00:17:38.900
 reverse this show how's that work? So traditionally all the equipment that is

00:17:38.900 --> 00:17:43.300
 purchased by the department specifically will be utilized by the department

00:17:43.300 --> 00:17:48.340
 specifically if at any point the asset moves between departments we do ensure

00:17:48.340 --> 00:17:54.220
 that the funding type is adjusted to support it. Thanks. I was curious this

00:17:54.220 --> 00:17:58.500
 company Romco are they someone that we've been dealing with previously for

00:17:58.500 --> 00:18:02.780
 these services? Yes sir we've we've utilized their services from the moment

00:18:02.780 --> 00:18:05.900
 we bought the first piece of Volvo equipment. Volvo has a proprietary

00:18:05.900 --> 00:18:10.540
 technology that requires the designated dealership to work on it that's why we

00:18:10.540 --> 00:18:14.300
 continue to utilize Romco for these services. So this is just to work on the

00:18:14.300 --> 00:18:20.220
 Volvo equipment not the other equipment? Correct. Oh okay so I thought it was much

00:18:20.220 --> 00:18:24.500
 broader. No they have specifically Romco works on Volvo we find the best return

00:18:24.500 --> 00:18:28.460
 on our investment here we can utilize other construction companies equipment

00:18:28.460 --> 00:18:32.260
 companies to repair the equipment but there's a point where just like if you

00:18:32.260 --> 00:18:35.040
 owned a Dodge pickup truck you wouldn't be able to take it to Ford to have the

00:18:35.040 --> 00:18:39.280
 computer diagnosed diagnosed so we stick with the specific manufacturers to see

00:18:39.280 --> 00:18:43.660
 that the best technical knowledge to repair these items. So how much of our

00:18:43.660 --> 00:18:49.660
 fleet of this type of heavy equipment is Volvo? I mean just ballpark? In the

00:18:49.660 --> 00:18:55.780
 agenda information sheet there is a quantity I believe it's 22 items that we

00:18:55.780 --> 00:18:59.500
 own that are Volvo but in the agenda information sheet summary it will say

00:18:59.500 --> 00:19:04.460
 the specific quantity that we have. I did miss that thank you. No worries yeah.

00:19:04.460 --> 00:19:15.500
 All right there appears to be no further discussion we will entertain a motion we

00:19:15.500 --> 00:19:20.540
 have a motion to approve by Mr. Newquist and second by Mr. Rybak. All those in

00:19:20.540 --> 00:19:25.540
 favor please say aye. Aye. Any opposed sign the same it passes unanimously. Thank you

00:19:25.540 --> 00:19:33.500
 very much. Thank you. All right that's pretty much moving right along. So you

00:19:33.500 --> 00:19:39.220
 want to call the next item. Management reports. Mr. Chair, members of the PBA so just the

00:19:39.220 --> 00:19:43.100
 first item to go through is the future agenda items I previously gave you the

00:19:43.100 --> 00:19:48.620
 dates for the upcoming budget items now they're on on this list here for you

00:19:48.620 --> 00:19:54.780
 just as a reminder June 23rd will be a financial update July 14th will actually

00:19:54.780 --> 00:19:59.700
 be a budget workshop that the the budget office and finance is planning to have

00:19:59.700 --> 00:20:02.940
 with you a very similar I think to the structure that they do with the City

00:20:02.940 --> 00:20:09.100
 Council and in July 28th we'll be asking you to make a recommendation to the City

00:20:09.100 --> 00:20:14.500
 Council on the budget and the rates which is kind of a normal process. Next

00:20:14.500 --> 00:20:21.220
 item is on your new business action items we still have one item that Mr. Rybak

00:20:21.220 --> 00:20:26.220
 asked regarding a specific contract we are working through that Mr. Rainer

00:20:26.220 --> 00:20:30.220
 asked a very good question and so we're having to go through that in a little

00:20:30.220 --> 00:20:35.460
 more detail that I had anticipated but hope to have that to you for the March

00:20:35.460 --> 00:20:41.460
 10th a date and then the only other quick item that I'll mention Stephen Gay

00:20:41.460 --> 00:20:47.200
 and I will be kind of alternating going forward in this particular seat here so

00:20:47.200 --> 00:20:51.260
 he and I'll be kind of working through that so next week will he be the next

00:20:51.260 --> 00:20:54.660
 meeting will be his first opportunity so please make it as difficult as you can

00:20:54.660 --> 00:21:02.180
 for him. All those in favor please say aye. Good training opportunity for him but

00:21:02.180 --> 00:21:05.460
 we'll be working through that so I just want to make you aware so with that

00:21:05.460 --> 00:21:09.860
 happy to answer any questions you may have. Any questions anybody like to

00:21:09.860 --> 00:21:18.540
 recommend a new action item? Doesn't appear so. Make it easy for everybody

00:21:18.540 --> 00:21:24.100
 looks like I don't think we have anything in the closed meeting so with

00:21:24.100 --> 00:21:30.980
 that we'll entertain a motion to shut this thing down. Got it? Second. All those

00:21:30.980 --> 00:21:38.140
 in favor say aye. We are adjourned.