 Good afternoon at 4 1 p.m. on February 12th 2025 I'll call this meeting of the

00:00:10.180 --> 00:00:15.640
 capital improvement advisory committee to order our first order of business is

00:00:15.640 --> 00:00:24.120
 the water and wastewater impact fee update so Kyle actually I think I was

00:00:24.120 --> 00:00:28.480
 gonna start for just a moment so a couple of things so Tina Furgans I'm

00:00:28.480 --> 00:00:33.520
 the deputy director of the services and planning director so first of all

00:00:33.520 --> 00:00:37.520
 planning zoning commission members as you know from time to time you serve as

00:00:37.520 --> 00:00:40.680
 the capital improvements advisory committee since we are going to be

00:00:40.680 --> 00:00:44.700
 discussing water and wastewater impact fees and that applies in our ETJ area

00:00:44.700 --> 00:00:48.560
 we're required to have a representative from the ETJ so hence why we have a new

00:00:48.560 --> 00:00:52.680
 friendly face around our table this afternoon with Jason joining us so he

00:00:52.680 --> 00:00:58.400
 is our ETJ representative I'm also wanted to just share with you what your

00:00:58.400 --> 00:01:03.800
 charge is if you will or responsibility as members of the capital improvements

00:01:03.800 --> 00:01:07.520
 advisory committee so that is first and foremost to advise and assist City

00:01:07.520 --> 00:01:11.360
 Council in adopting their land use assumptions when we work on projects of

00:01:11.360 --> 00:01:15.520
 this nature you have a responsibility to review the capital improvement plans and

00:01:15.520 --> 00:01:18.760
 file written comments so your written comments are typically that will be the

00:01:18.760 --> 00:01:24.480
 minutes that we prepare associated with with this meeting monitoring evaluating

00:01:24.480 --> 00:01:27.720
 implementation of the capital improvements plan so I'm sure Kyle will

00:01:27.720 --> 00:01:31.200
 go through that as part of his presentation with the proposed

00:01:31.200 --> 00:01:36.100
 improvements that are included within that program and then it does say file

00:01:36.100 --> 00:01:39.280
 semi-annual reports with respect to the progress of our capital improvements

00:01:39.280 --> 00:01:43.200
 plan and report to the political subdivision IEB in our city of any

00:01:43.200 --> 00:01:47.320
 perceived inequities and implementing the planner imposing the impact fee so

00:01:47.320 --> 00:01:51.400
 it's again a periodically meeting from time to time just to monitor the

00:01:51.400 --> 00:01:55.560
 implementation of the plan and then also advise council in the need to update or

00:01:55.560 --> 00:01:58.640
 revise the land use assumptions the capital improvements plan and impact fee

00:01:58.640 --> 00:02:01.920
 and I believe in Kyle's presentation he'll go over ideally that the time

00:02:01.920 --> 00:02:06.480
 periods of when we make updates to the the impact fees for the the water and

00:02:06.480 --> 00:02:10.320
 wastewater programs so with that I'm going to turn it over to Kyle Pedigo and

00:02:10.320 --> 00:02:14.400
 allow him to be able to proceed thank you

00:02:18.200 --> 00:02:20.260
 you

00:02:20.260 --> 00:02:30.600
 wastewater impact the update this is updated every five years per the TAC so

00:02:30.600 --> 00:02:34.920
 first are a few of our impact fee study components with this study we start with

00:02:34.920 --> 00:02:40.280
 our land use and growth assumptions then we outline our service units we

00:02:40.280 --> 00:02:46.880
 identify our capital improvement plan we designate our service areas and then we

00:02:46.880 --> 00:02:54.520
 ultimately end up with the impact fee calculation this map shows our phasing

00:02:54.520 --> 00:02:59.640
 and growth assumptions for the impact fee time period this information is

00:02:59.640 --> 00:03:04.480
 drawn from the Denton 2040 comprehensive plan from our 2023

00:03:04.480 --> 00:03:10.680
 wastewater master plan and from the 2024 water master plan so as you can see over

00:03:10.680 --> 00:03:16.040
 the next five years we're anticipating an 8.1 percent annual growth rate in the

00:03:16.040 --> 00:03:21.040
 city and then in the 5 to 10 year window we're expecting that to taper down to

00:03:21.040 --> 00:03:29.400
 3.4 percent for our service units for water and wastewater impact fee service

00:03:29.400 --> 00:03:33.320
 units are based off of the installed meter size your installed water meter

00:03:33.320 --> 00:03:38.800
 size for your home or your building so at the city of Denton our base meter

00:03:38.800 --> 00:03:44.400
 size is our 5/8 by 3/4 inch meter and that provides enough water flow to serve

00:03:44.400 --> 00:03:49.880
 a single-family home as a comparison a big box or a retail development may

00:03:49.880 --> 00:03:57.640
 require a 2 inch water meter so that 2 inch water meter can provide up to 8

00:03:57.640 --> 00:04:02.920
 times the flow of our base meter the 5/8 by 3/4 so what that means ultimately is

00:04:02.920 --> 00:04:06.360
 that that retail development that receives a 2 inch meter would be

00:04:06.360 --> 00:04:16.240
 responsible for 8 times the base unit impact fee here's an overview of our

00:04:16.240 --> 00:04:21.240
 this map shows an overview of our water impact fee capital improvement plan so

00:04:21.240 --> 00:04:26.840
 every project they're listed on in blue and outlined in blue our existing

00:04:26.840 --> 00:04:31.760
 infrastructure that has available capacity to accommodate some of this

00:04:31.760 --> 00:04:35.520
 future growth that we're anticipating so the way that's factored into the impact

00:04:35.520 --> 00:04:41.240
 fee calculation is that available capacity is compared to the cost of

00:04:41.240 --> 00:04:44.880
 installation and then that's carried forward into the impact fee update

00:04:44.880 --> 00:04:51.120
 everything outlined in red is conveyance and treatment future conveyance and

00:04:51.120 --> 00:04:54.720
 treatment that we have planned to accommodate the growth in these areas

00:04:54.720 --> 00:04:58.440
 with the future conveyance and treatment we take a hundred percent of that cost

00:04:58.440 --> 00:05:06.440
 the planned cost of installation and calculate that into the impact fee this

00:05:06.440 --> 00:05:11.000
 is the basically the same map but for our wastewater impact fee capital

00:05:11.000 --> 00:05:14.680
 improvement plan all of the existing infrastructure with available capacity

00:05:14.680 --> 00:05:20.640
 is shown in green and all of the future infrastructure to be constructed in the

00:05:20.640 --> 00:05:31.640
 10-year window is shown in red so this is an overlay of our capital improvement

00:05:31.640 --> 00:05:38.520
 plan for our water utility over the top of our existing service area map for

00:05:38.520 --> 00:05:43.560
 our water impact fees so our existing service areas are broken into service

00:05:43.560 --> 00:05:48.240
 area 1a which is our centralized downtown portion 1b which is our loop

00:05:48.240 --> 00:05:53.360
 basically the loop around the city and unit or area 2 which is out to the

00:05:53.360 --> 00:05:57.720
 western portion of the city now we're not with this update we're not planning

00:05:57.720 --> 00:06:04.320
 or proposing any changes to the water impact fee service areas we're planning

00:06:04.320 --> 00:06:12.640
 on keeping that the same however we are proposing changes to the wastewater

00:06:12.640 --> 00:06:16.760
 service area so this is a map showing our existing single wastewater service

00:06:16.760 --> 00:06:20.280
 area this was established because we currently we have a single water

00:06:20.280 --> 00:06:25.960
 reclamation plant which all wastewater effluent in the city flows to however

00:06:25.960 --> 00:06:31.600
 with the wastewater master plan we identified the need for two additional

00:06:31.600 --> 00:06:37.600
 plants to be constructed within the drainage basins so this shows an

00:06:37.600 --> 00:06:44.920
 overlay of the proposed division of that single service area into three

00:06:44.920 --> 00:06:48.800
 individual service areas corresponding with those drainage basins so we have

00:06:48.800 --> 00:06:52.800
 Clear Creek to the north the concrete which is our centralized drainage basin

00:06:52.800 --> 00:06:59.200
 and Hickory Creek which is our to the southwest its best practice with

00:06:59.200 --> 00:07:03.920
 wastewater conveyance to convey it downhill use gravity downhill to your

00:07:03.920 --> 00:07:10.680
 treatment locations so this overlay shows how that conveyance infrastructure

00:07:10.680 --> 00:07:17.060
 is also pretty cleanly divided between these drainage basins for your Clear

00:07:17.060 --> 00:07:26.000
 Creek Hickory Creek and Pecan Creek basins that brings us to the estimated

00:07:26.000 --> 00:07:29.440
 maximum assessable impact fee calculation so to calculate this amount

00:07:29.440 --> 00:07:35.120
 we take our 10-year recoverable cost of impact fee capital improvement plan and

00:07:35.120 --> 00:07:40.400
 we divide that by our projected our 10-year service unit projection

00:07:40.400 --> 00:07:45.800
 number so as you can see for water we're anticipating our 10-year capital

00:07:45.800 --> 00:07:54.280
 improvement investment to be 582 million divided by our 52,774 projected service

00:07:54.280 --> 00:08:02.200
 units which brings us to our maximum assessable fee of $11,046 similarly for

00:08:02.200 --> 00:08:05.840
 wastewater we have slightly higher investment due to the addition of those

00:08:05.840 --> 00:08:10.480
 the requirement of those two new treatment plants so that brings us to

00:08:10.480 --> 00:08:16.160
 760 million dollars divided by our 52,276 service units for our maximum

00:08:16.160 --> 00:08:21.040
 assessable fee of $14,551

00:08:21.040 --> 00:08:26.600
 once we get that number we divide it among our service areas based on the

00:08:26.600 --> 00:08:32.440
 infrastructure that's located within those areas so for our water the in blue

00:08:32.440 --> 00:08:40.440
 the chart showing our 2018 update versus our 2024 proposed rates service area 1a

00:08:40.440 --> 00:08:43.400
 which is that centralized downtown portion actually sees a reduction in

00:08:43.400 --> 00:08:47.120
 impact fee because it's mostly if you look at it the infrastructure there is

00:08:47.120 --> 00:08:50.400
 mostly built out there's not very much needed to accommodate growth in that

00:08:50.400 --> 00:08:55.400
 area versus service area 1b and 2 where we have their largest larger service

00:08:55.400 --> 00:09:00.760
 areas and more infrastructure is required in those areas so both 1b and

00:09:00.760 --> 00:09:06.200
 2c a significant significant increase now our wastewater impact fee comparison

00:09:06.200 --> 00:09:11.880
 in 2018 we had that single service area so in the entire service area it was

00:09:11.880 --> 00:09:18.080
 four thousand seven hundred sixteen dollars for a base impact fee amount and

00:09:18.080 --> 00:09:23.840
 you can see that we divided that into the three separate drainage basins again

00:09:23.840 --> 00:09:29.040
 corresponding to the infrastructure within those basins we have reviewed

00:09:29.040 --> 00:09:33.680
 these numbers with developers in the area so with the larger developers known

00:09:33.680 --> 00:09:41.000
 developments the hunter ranch coal ranch and the TCCI mud and we've integrated

00:09:41.000 --> 00:09:52.080
 their comments and feedback into the study so next steps water utilities is

00:09:52.080 --> 00:10:00.320
 proposing that we seek a hundred percent adoption of our of our impact fee rate

00:10:00.320 --> 00:10:06.080
 a hundred percent recovery so pending the results of today's meeting we could

00:10:06.080 --> 00:10:10.560
 begin advertisement after today's meeting for our City Council public

00:10:10.560 --> 00:10:14.240
 hearing the next date for our City Council public hearing would be March

00:10:14.240 --> 00:10:21.440
 25th and then for the City Council ordinance adoption would be April 1st any

00:10:21.440 --> 00:10:28.920
 questions thank you Kyle just because this is I think the first time for a

00:10:28.920 --> 00:10:34.200
 CIAC meeting for all the four members here I'm gonna ask a couple of sort of

00:10:34.200 --> 00:10:38.920
 general level setting questions and then I want to hear other questions from from

00:10:38.920 --> 00:10:47.840
 the committee within this process I believe there's an option of assuming a

00:10:47.840 --> 00:10:52.600
 50% utilization and recovery rate or doing a cost of service with financing

00:10:52.600 --> 00:10:59.720
 study can can you explain one which one we chose and what the goals of that

00:10:59.720 --> 00:11:05.200
 study is our our and the reason I ask is that sometimes we talk about hundred

00:11:05.200 --> 00:11:11.080
 percent and then we say well we want it to be a fair split but my understanding

00:11:11.080 --> 00:11:17.200
 is that that study looks at how much of this infrastructure will be used or

00:11:17.200 --> 00:11:21.920
 necessary because of the new development versus because of existing developed

00:11:21.920 --> 00:11:26.680
 properties correct and so we chose to go with the financial study and that's if

00:11:26.680 --> 00:11:31.080
 you if you look in the report that's where we break down basically the

00:11:31.080 --> 00:11:35.160
 utilization percentage of the existing infrastructure in the ground to carry

00:11:35.160 --> 00:11:39.760
 forward versus to carry forward for that's that would accommodate the new

00:11:39.760 --> 00:11:45.880
 development versus the brand new infrastructure for conveyance there so

00:11:45.880 --> 00:11:51.640
 that's that's why we perform that study and are recommending 100% cost of

00:11:51.640 --> 00:12:00.200
 recovery on this okay thank you questions it's a lot of information so

00:12:00.200 --> 00:12:05.080
 do you mind going back to the slide that compared the the rates from before to

00:12:05.080 --> 00:12:10.480
 now so the the wastewater is going up quite a bit and you said you you talked

00:12:10.480 --> 00:12:15.040
 to the developers yes we've had several update meetings with developers on this

00:12:15.040 --> 00:12:21.200
 and we've presented them with the same information and explained showed the

00:12:21.200 --> 00:12:26.280
 maps that are outlined our capital improvement plan showed the need for

00:12:26.280 --> 00:12:36.400
 those separate treatment locations to get their feedback they're not happy

00:12:36.400 --> 00:12:40.000
 with the increase but at the same time they understand with the amount of

00:12:40.000 --> 00:12:43.960
 infrastructure involved to bring service to that area that an increase is

00:12:43.960 --> 00:12:47.800
 necessary yeah because particularly with the Hickory Creek and Clear Creek you

00:12:47.800 --> 00:12:52.960
 don't have the treatment plants and that's a big expense right so yeah shown

00:12:52.960 --> 00:12:56.160
 on that map you can see you hit the Hickory Creek and Clear Creek have the

00:12:56.160 --> 00:13:00.640
 largest number of new build projects

00:13:00.640 --> 00:13:10.680
 other questions

00:13:14.000 --> 00:13:19.560
 I have a couple on the I guess can you go all the way back to the growth

00:13:19.560 --> 00:13:26.160
 assumptions and then I've got a couple on the the wastewater projects so you

00:13:26.160 --> 00:13:31.120
 said that these this came from a combination of the comprehensive plan

00:13:31.120 --> 00:13:36.920
 and a couple of the the water and wastewater studies going forward I don't

00:13:36.920 --> 00:13:44.320
 recall seeing a map like this with the pink and blue areas outlined as places

00:13:44.320 --> 00:13:48.260
 we think are gonna grow in the next five or ten years can you let us know where

00:13:48.260 --> 00:13:52.320
 specifically you got that data from that comes from our wastewater master plan

00:13:52.320 --> 00:13:56.200
 which was adopted last year and the water master plan which we plan on

00:13:56.200 --> 00:14:01.560
 adopting quarter one of this year so with that we took the land use

00:14:01.560 --> 00:14:08.080
 assumptions from the 2040 comprehensive master or comprehensive plan and then we

00:14:08.080 --> 00:14:12.900
 combined it with outreach with development services with outlining the

00:14:12.900 --> 00:14:17.340
 boundaries of known developments and basically the pink and blue show are

00:14:17.340 --> 00:14:24.000
 different expected infill rates within those boundaries so each each of these

00:14:24.000 --> 00:14:29.780
 outlined areas are planned developments known developments or where where the

00:14:29.780 --> 00:14:39.320
 study shows that development is likely within that tenure window okay just

00:14:39.320 --> 00:14:44.820
 looking at the map this may be more of a question to planning but you know I see

00:14:44.820 --> 00:14:50.480
 a large northeast in an area on there and and that plan is kind of on hiatus

00:14:50.480 --> 00:14:59.040
 until we do something else and I don't see very much from a downtown

00:14:59.040 --> 00:15:03.960
 perspective and we just did the downtown plan so I'm just trying to understand do

00:15:03.960 --> 00:15:09.120
 we expect the downtown plan growth to happen after that 10-year window help me

00:15:09.120 --> 00:15:14.680
 understand Scott McDonald director of development services so what you see

00:15:14.680 --> 00:15:18.920
 here which is different than the comprehensive plan is when we crafted

00:15:18.920 --> 00:15:23.820
 and drafted the the comprehensive plan we didn't expect the growth that we've

00:15:23.820 --> 00:15:30.320
 experienced to date and so what you're seeing to the west to the southwest and

00:15:30.320 --> 00:15:34.760
 to the north is just incredible growth that's actual development on the ground

00:15:34.760 --> 00:15:39.920
 and development that's in review so when they were going through the wastewater

00:15:39.920 --> 00:15:45.600
 master plan they worked with planning to just to see what those unit counts were

00:15:45.600 --> 00:15:51.560
 and ultimately came up with what this is so this is truth to facts on the ground

00:15:51.560 --> 00:15:58.560
 what you see in the Northeast area is reflective of what has been proposed at

00:15:58.560 --> 00:16:04.400
 the time that we were doing that and recognizing that that is paused doesn't

00:16:04.400 --> 00:16:08.720
 change the fact that that wastewater facility will be going in and that

00:16:08.720 --> 00:16:12.940
 interceptor line is going all the way over to 35 to accommodate for that basin

00:16:12.940 --> 00:16:18.120
 so it's a much grander area than just what's shaded and then I think for the

00:16:18.120 --> 00:16:22.920
 downtown the infill components of it will really be treated as a result of

00:16:22.920 --> 00:16:28.280
 when these other facilities are put into into service that will have less impact

00:16:28.280 --> 00:16:34.280
 on the Clear Creek or the a concrete thank you facility which will be able to

00:16:34.280 --> 00:16:39.520
 accommodate so if that helps yeah thank you no it does make sense just in

00:16:39.520 --> 00:16:43.600
 general that you know utilization rates I think on I think this was the water

00:16:43.600 --> 00:16:48.480
 instead of the wastewater for some of the mains underneath Locust Street were

00:16:48.480 --> 00:16:56.240
 under 20% so we've got a large amount of capacity remaining can you go to the map

00:16:56.240 --> 00:17:04.360
 with all the pipes and projects for me for water or wastewater wastewater I

00:17:04.360 --> 00:17:10.080
 noticed that the pecan Creek reclamation plant is slated for an increase in

00:17:10.080 --> 00:17:15.240
 capacity as well as the other two new plants from I think like six million

00:17:15.240 --> 00:17:19.840
 gallons per day up to 24 or something like that so our current treatment

00:17:19.840 --> 00:17:24.440
 capacity at pecan Creek is 21 million gallons per day we're okay we're

00:17:24.440 --> 00:17:28.320
 upgrading it to 26 million yeah okay I must have read that wrong because it it

00:17:28.320 --> 00:17:39.800
 struck me as a much larger increase at that time okay and then I guess I'm

00:17:39.800 --> 00:17:46.200
 trying to understand if you want to go back or go forward to the the

00:17:46.200 --> 00:17:56.960
 recommended in impact fee tables there you know the service area 1a is not

00:17:56.960 --> 00:18:03.040
 exactly the same as pecan Creek but it you know it's similar in that sense can

00:18:03.040 --> 00:18:09.160
 you speak to what is driving that larger impact fee for the wastewater in that

00:18:09.160 --> 00:18:16.360
 area versus the water so the biggest driver in the pecan Creek Basin is the

00:18:16.360 --> 00:18:21.400
 reconstruction of the pecan Creek water reclamation facility so that the

00:18:21.400 --> 00:18:26.840
 facility again we're expanding we're adding 5 million gallons per day

00:18:26.840 --> 00:18:33.760
 capacity but we're also reconstructing facility I think it's 50 years old yeah

00:18:33.760 --> 00:18:36.760
 50 it's a 50 year old wastewater facility that's nearing the end of its

00:18:36.760 --> 00:18:43.000
 life so this it's not just conveyance it's it's the reconstruction of the

00:18:43.000 --> 00:18:48.160
 plant okay so even though it's only an increase in capacity of something like

00:18:48.160 --> 00:18:52.360
 20% it's it's really a rebuild so it's a hundred and twenty percent of the

00:18:52.360 --> 00:18:58.280
 existing capacity being constructed if you will okay that helps and then last

00:18:58.280 --> 00:19:03.880
 question and and this may be a longer term question so I'm not sure who was

00:19:03.880 --> 00:19:10.200
 here this long ago I remember seeing an ISR way back around 2013-2014 time frame

00:19:10.200 --> 00:19:19.040
 where the the water utilities services were were seeking to move toward a

00:19:19.040 --> 00:19:23.160
 hundred percent revenue replacement model for at least the pipe

00:19:23.160 --> 00:19:28.360
 infrastructure and then I noticed in this last year's budget that had drifted

00:19:28.360 --> 00:19:35.680
 down to 30% from revenue and 70% from revenue bonds can you speak to that at

00:19:35.680 --> 00:19:42.720
 all and and help explain what how that impacts this impact fee calculation

00:19:42.720 --> 00:19:46.400
 that's a little beyond my time frame but Stephen should be able to speak that

00:19:46.400 --> 00:19:52.880
 thank you good afternoon Stephen Gage general manager water utilities and

00:19:52.880 --> 00:19:58.560
 street operations it's actually before my time as well I got here in 2021 but

00:19:58.560 --> 00:20:03.640
 what I can tell you is that we are we are reevaluating our financial models

00:20:03.640 --> 00:20:08.760
 and diversifying our the way that we fund projects historically we would issue

00:20:08.760 --> 00:20:13.800
 debt and then we would have to either put that debt right to use or start

00:20:13.800 --> 00:20:17.920
 paying on it and you may hear a term called WIFIA so it's a water

00:20:17.920 --> 00:20:23.360
 infrastructure innovate funding Innovation Act which is a federal program and so we

00:20:23.360 --> 00:20:27.320
 have an application moving forward for those funds and those dollars allow us

00:20:27.320 --> 00:20:34.360
 to actually defer the repayment of the loan so we take out WIFIA funds once we

00:20:34.360 --> 00:20:39.040
 finish the project we get about a substantial completion there's a five

00:20:39.040 --> 00:20:44.080
 year window before we have to begin debt services so what that allows us to do is

00:20:44.080 --> 00:20:48.200
 basically you know I guess fortify the generational equity piece of the

00:20:48.200 --> 00:20:54.160
 equation and and it's actually moving us closer to that that cash funding

00:20:54.160 --> 00:20:58.880
 because we're able to add customers generate revenue and then cash fund the

00:20:58.880 --> 00:21:03.280
 majority of it so I can't speak to the memo that you're referring to but I can

00:21:03.280 --> 00:21:07.000
 tell you that we are even if we've slipped a bit we're gonna get back on

00:21:07.000 --> 00:21:12.920
 track okay thank you that's all I had any more questions now that we've talked

00:21:12.920 --> 00:21:19.480
 through more of this okay well we'll see if if any come up in discussion thank

00:21:19.480 --> 00:21:22.240
 you Kyle okay

00:21:22.240 --> 00:21:35.680
 yeah oh yeah we're looking for formal recommendation from the Commission so I

00:21:35.680 --> 00:21:44.680
 would recommend a motion okay so yeah if you can leave the proposed impact fee

00:21:44.680 --> 00:21:48.880
 update their slide up there so this is what staff is recommending is that

00:21:48.880 --> 00:21:55.280
 correct correct okay so thoughts of direction or concerns or everything

00:21:55.280 --> 00:22:03.640
 looks okay that's good to me I'll make a motion feel free to can I just say to

00:22:03.640 --> 00:22:13.120
 recommend to as a as presented okay a motion by Commissioner Riggs is there a

00:22:13.120 --> 00:22:27.280
 second okay second by member Kalachek thank you I guess I will call for a vote

00:22:27.280 --> 00:22:34.320
 all those in favor raise your hands that we can get a count and that passes

00:22:34.320 --> 00:22:42.600
 unanimously five with one absence thank you Kyle thank you

00:22:42.600 --> 00:22:50.400
 without objection I will adjourn this meeting of the capital impact advisory

00:22:50.400 --> 00:22:56.720
 committee of Denton thank you 424