 Good morning and welcome to the regularly scheduled meeting of the Public Utilities

00:00:06.240 --> 00:00:14.440
 Board. It is 9 a.m. on December 9th, 2024, and we will open our meeting with any presentations

00:00:14.440 --> 00:00:21.960
 from the public. I don't think we have any presentations today. Moving on to the consent

00:00:21.960 --> 00:00:32.760
 agenda, items A, D, E, and F have been pulled for questions, so I'll consider a motion for

00:00:32.760 --> 00:00:46.260
 items B, C, and G. So moved. We have a motion and a second. All in favor? Aye. Opposed? Motion

00:00:46.260 --> 00:00:59.120
 passes. Now, item A. Good morning, everyone. Chris Carroll. I'm the Water Utilities Treatment

00:00:59.120 --> 00:01:04.560
 Division Manager for the City of Denton, and I'm here to talk about the 25% contract amendment

00:01:04.560 --> 00:01:28.600
 to the chemicals that we procure from vendors. So the purpose of this request, two things.

00:01:28.600 --> 00:01:36.600
 We've got extreme chemical cost increases from the vendors, and two, we've got significant

00:01:36.600 --> 00:01:42.880
 demand since 2021 when this contract went into place. Production was approximately six

00:01:42.880 --> 00:01:50.560
 billion gallons in 2021 total for the year. We are now over eight billion gallons a year.

00:01:50.560 --> 00:01:58.760
 And as you can see, we've got the current year in blue. It's averaging five to 10 MGD

00:01:58.760 --> 00:02:04.680
 over the last five-year average, which that's where we come up with that number. Chemical

00:02:04.680 --> 00:02:10.000
 usage, FARIC is our primary coagulant. Due to the increased demand, you can see now we're

00:02:10.000 --> 00:02:14.100
 from four million gallons up to almost five million gallons per year, and this is over

00:02:14.100 --> 00:02:17.920
 a five-year period. I'm sorry, could you slow down? What was that again you were pointing

00:02:17.920 --> 00:02:22.720
 at? This one right here, this is the FARIC, the usage right here, production chemical

00:02:22.720 --> 00:02:28.880
 usage. FARIC sulfate. Yes, correct. Okay. Yeah, and that's our primary coagulant. And

00:02:28.880 --> 00:02:33.920
 then this is over here is where we were talking about the treatment chemical price increases.

00:02:33.920 --> 00:02:40.320
 Our most significant one was sodium hypochlorite, which is used for disinfection. So we went

00:02:40.320 --> 00:02:48.200
 from like 12 cents a gallon all the way up to we're almost at $2 a gallon now. Yeah.

00:02:48.200 --> 00:02:55.600
 Can you tell us what's driving that price increase? It's manufacturing. The supply chain,

00:02:55.600 --> 00:02:59.680
 I think we're all aware of the issues that they've had. So a lot of these chemicals require

00:02:59.680 --> 00:03:04.840
 multiple products to create. And that's what we've been told is supply and then the availability

00:03:04.840 --> 00:03:09.880
 of the chemicals to create them. I mean, that's a very significant increase, much greater

00:03:09.880 --> 00:03:15.240
 than the rate of inflation. I completely agree with you. Currency exchange. Yes. I'm trying

00:03:15.240 --> 00:03:19.320
 to wrap my head around that. Yes, I think we all were when we saw this and it definitely

00:03:19.320 --> 00:03:26.120
 wasn't planned, especially on the sodium hypochlorite. Question? Yes. So it looked like it's not a

00:03:26.120 --> 00:03:30.280
 gradual thing. Is this like they just fell off the cliff as far as the price is going

00:03:30.280 --> 00:03:35.200
 up? Is that? Yeah. And what's interesting, it seems to have leveled off. Could you go

00:03:35.200 --> 00:03:52.400
 back to that? Sure. Let me see. This one right here. A reverse cliff. Yes. A nice hill. And

00:03:52.400 --> 00:03:59.800
 no indication at all. Like I said, it was the quarter three, 2022. We're all aware of

00:03:59.800 --> 00:04:05.340
 the supply chain. I know stuff that I've personally purchased, it's three times, four times as

00:04:05.340 --> 00:04:10.960
 much as it used to pay. And that was the reason that we were given. That's fine. Okay. Yeah,

00:04:10.960 --> 00:04:17.760
 appreciate it. Yeah. Thank you. Just an idea of what the vendors that are included in this

00:04:17.760 --> 00:04:22.960
 chemical contract, some of them can supply the same thing. We use that for redundancy.

00:04:22.960 --> 00:04:27.720
 If one was to run out, I mean, these chemicals are required to treat the water the way we

00:04:27.720 --> 00:04:37.520
 do. So usage forecasting, this production five year annual total on chemicals, it's

00:04:37.520 --> 00:04:41.640
 a little deceiving because when we get into 24, we haven't finished that year out. So

00:04:41.640 --> 00:04:47.920
 the graph's a little skewed, but it's, it's leveled off at least for now. We anticipate

00:04:47.920 --> 00:04:53.340
 though, that it's, it's going to continue that rise just because of the demand in the

00:04:53.340 --> 00:05:01.600
 system. I was going to ask a question about that, increase demand. It seems like the demand

00:05:01.600 --> 00:05:07.520
 has outstripped the growth in population or am I missing something? Has the, has the population

00:05:07.520 --> 00:05:12.760
 increased that, that many fold in just this few years? Well, from what I understand Denton

00:05:12.760 --> 00:05:19.120
 is on an 8% growth. I'm not sure about the industry that's here. Industrial usage can

00:05:19.120 --> 00:05:24.800
 increase that as well. I know there's several large developments, so I would anticipate

00:05:24.800 --> 00:05:29.280
 that we're going to see that gradual increase as we move through the year. And we've got

00:05:29.280 --> 00:05:34.760
 the expansions at Ray Roberts planned to take it all the way up to 50 MGD. We have the expansion

00:05:34.760 --> 00:05:39.480
 at Pecan Creek, which is going to take us to 26 and eventually 30, and then some projects

00:05:39.480 --> 00:05:43.920
 in Clear Creek and Hickory Creek as well. And so those chemicals, we're going to need

00:05:43.920 --> 00:05:48.480
 those chemicals at those sites too. So staff will be looking at that and what that's going

00:05:48.480 --> 00:05:56.120
 to take to budget for that. Okay. But again, it does seem that the demand has outstripped

00:05:56.120 --> 00:06:01.120
 the growth in population. So has something changed in the way we're treating the water?

00:06:01.120 --> 00:06:06.720
 Are we required to use more chemicals or achieve a higher level of quality or something along

00:06:06.720 --> 00:06:12.320
 those lines? Well, we do. We, right now we are, we participate in the total optimization

00:06:12.320 --> 00:06:18.280
 program from TCEQ. That requires us to meet certain turbidity standards. And we also have

00:06:18.280 --> 00:06:23.520
 achieved the Director's Award for the partnership, AWWA Partnership for Safe Drinking Water,

00:06:23.520 --> 00:06:29.480
 which requires we have better raw water treatment all the way through the filters and then out

00:06:29.480 --> 00:06:34.160
 to the system as well. So we do strive to have the best water, which I think we all

00:06:34.160 --> 00:06:41.060
 know that we're second best, at least last year. So we do strive to have a better quality

00:06:41.060 --> 00:06:43.880
 water than what's demanded by regular water quality standards.

00:06:43.880 --> 00:06:48.640
 Okay. So we have an increase in population and an increase in quality of our water.

00:06:48.640 --> 00:06:51.960
 That's correct. Okay. Those are good things to know. Thank you.

00:06:51.960 --> 00:06:57.120
 Yes. So the adjustment that we're asking for is a little over, I think it's 3.3 million.

00:06:57.120 --> 00:07:04.720
 We're going from a not to exceed from 13 to 42 to 16.5. That will get us through the end

00:07:04.720 --> 00:07:10.020
 of this fiscal year. Just checked with staff, we're at probably 99% of the contract spend

00:07:10.020 --> 00:07:16.160
 so far. The anticipation is after the first of the year, we're going to initiate drafting

00:07:16.160 --> 00:07:21.080
 a new contract with these forecasting methods put into place so we're not having to come

00:07:21.080 --> 00:07:30.160
 back and do these amendments. So in conclusion, staff's evaluated the usage,

00:07:30.160 --> 00:07:36.400
 the demand, the costs, and we're looking for a request for approval for this amendment

00:07:36.400 --> 00:07:45.840
 to the contract. Any questions? When we go to renegotiate, so we're going

00:07:45.840 --> 00:07:51.080
 to renegotiate the whole contract come the first year and are we going to just redo it

00:07:51.080 --> 00:07:56.840
 as five on top of the 2026 maturity or do we do it five from next year because the last

00:07:56.840 --> 00:08:02.760
 one was five years? Yeah. I'd have to talk to Lori about the contract.

00:08:02.760 --> 00:08:06.560
 Was it five year with two extensions or was it three with two?

00:08:06.560 --> 00:08:09.680
 Three with two. Okay. So it's three with two. That's something

00:08:09.680 --> 00:08:16.600
 we'll need to look at. I'm assuming we're pricing for multiple vendors

00:08:16.600 --> 00:08:20.960
 or the contract restricts us to just one vendor? No. There's multiple vendors that can bid

00:08:20.960 --> 00:08:24.720
 on those contract items. Okay. And the pricing is consistent across multiple

00:08:24.720 --> 00:08:29.000
 vendors? What I've seen, Lori, do you have any information

00:08:29.000 --> 00:08:34.080
 on that? The idea is to use the best value if we can and if that's not available, then

00:08:34.080 --> 00:08:37.660
 why do we use that? Yeah. When we re-solicit it, we'll probably

00:08:37.660 --> 00:08:42.600
 do a request for proposal. So we'll split it into sections like we did this last time

00:08:42.600 --> 00:08:48.160
 and we award per section to multiple vendors just so we always have someone that can supply

00:08:48.160 --> 00:08:53.000
 it. So price will be a part of it. Normally it's about 40%, sometimes up to 60%, depending

00:08:53.000 --> 00:08:58.040
 on what other evaluations we want to look at, like performance and service and stuff

00:08:58.040 --> 00:09:03.920
 like that. Sometimes it's low price, but sometimes it's overall best value for the city, but

00:09:03.920 --> 00:09:08.960
 we will award by section. So this contract, I think, had 10 different vendors, some in

00:09:08.960 --> 00:09:12.520
 primary positions, some in secondary positions, and we'll probably assume to do the same thing

00:09:12.520 --> 00:09:14.720
 next time. Thank you.

00:09:14.720 --> 00:09:18.880
 Yeah. Any further questions?

00:09:18.880 --> 00:09:20.560
 One final question. Sure.

00:09:20.560 --> 00:09:26.200
 The hypochlorite, that tremendous increase in cost, have y'all evaluated doing onsite

00:09:26.200 --> 00:09:31.420
 generation instead of purchasing it? We have not. It's something that we can look

00:09:31.420 --> 00:09:37.280
 into. Right now, at Ray Roberts, we were using chlorine gas, and the intent was to go away

00:09:37.280 --> 00:09:43.560
 from the gas production of that, and we've got a temporary bleach tank in there right

00:09:43.560 --> 00:09:49.520
 now. The Lake Lewisville had converted several years ago to liquid ammonium sulfate and sodium

00:09:49.520 --> 00:09:55.960
 hypochlorite, much safer for staff. So we will see an increase in cost just because

00:09:55.960 --> 00:10:01.240
 the liquid form is more expensive than the gas, for some reason now that it's shot up

00:10:01.240 --> 00:10:06.880
 to $2, almost $2 a gallon. But that's something we can look into, but definitely be evaluated.

00:10:06.880 --> 00:10:12.200
 Yeah. I know other groups throughout North Texas have moved to that because it's not

00:10:12.200 --> 00:10:16.800
 a hazardous material until you make the hazardous material onsite, so you don't need hazardous

00:10:16.800 --> 00:10:21.800
 shipping. You aren't calling a bunch of water. You're only, you know, you're delivering just

00:10:21.800 --> 00:10:22.800
 your salt. Correct.

00:10:22.800 --> 00:10:25.520
 Your machine turns, you know, adds the water and turns it into-

00:10:25.520 --> 00:10:29.840
 Yeah, I'd like to look at how safe it is for our staff onsite, because I know there are

00:10:29.840 --> 00:10:33.780
 some hazards associated with onsite generation as well.

00:10:33.780 --> 00:10:37.400
 Thank you. That is an excellent point, sir. Thank you.

00:10:37.400 --> 00:10:46.400
 I'd like to move approval of the item. Do we have a motion? Do we have a second?

00:10:46.400 --> 00:10:55.760
 All in favor say aye. All opposed? Same sign. A passes. Now on to D. Do we have a single

00:10:55.760 --> 00:11:00.460
 presentation for D, E, and F? That's correct. And Brandon Hamby is coming

00:11:00.460 --> 00:11:06.840
 up from DME. So we'll introduce items D, E, and F for the

00:11:06.840 --> 00:11:09.600
 presentation. Good morning. My name is Brandon Hamby. I'm

00:11:09.600 --> 00:11:18.160
 the leader and division manager for DME. Let me get this up.

00:11:18.160 --> 00:11:35.800
 And then, all right. That's not a keyboard. All right.

00:11:35.800 --> 00:11:39.740
 For today, we're going over the invitation for bid.

00:11:39.740 --> 00:11:45.480
 It's a renewal of the previous bid that we had, because the previous bid, we've run out

00:11:45.480 --> 00:11:52.240
 of money on a couple of vendors, kind of like they were talking about on the previous presentation.

00:11:52.240 --> 00:11:57.120
 Our bids are broken up into sections. And so we have the meter bid broken up into

00:11:57.120 --> 00:12:02.880
 several sections. And of those sections, two of our vendors have run out of allowable spend.

00:12:02.880 --> 00:12:10.360
 And so after consulting with our procurement department, it was decided to go ahead and

00:12:10.360 --> 00:12:16.360
 do a renewal of the whole bid because of two vendors being out of that spend.

00:12:16.360 --> 00:12:23.200
 So what we did is we went out and we did a new meter bid for the whole meter blanket.

00:12:23.200 --> 00:12:28.360
 So and that's kind of what we talked about here. Previous spend for section A, because

00:12:28.360 --> 00:12:33.800
 I think that's why Mr. Ryback had pulled this, was the questions about section A of the metering

00:12:33.800 --> 00:12:37.880
 section. So far, we had spent $4.9 million with that

00:12:37.880 --> 00:12:43.760
 section. But the total allowable spend for that section was $8 million.

00:12:43.760 --> 00:12:50.340
 So we hadn't spent that whole section of that one, but we have that there for just in case,

00:12:50.340 --> 00:12:54.960
 because we have, like I said, 8% growth. We've been adding about 3,000 electrometers

00:12:54.960 --> 00:12:58.840
 per year. And we also have a maintenance program where we have to change out all the meters

00:12:58.840 --> 00:13:03.280
 that need to be changed out because of our aging meter population from when we first

00:13:03.280 --> 00:13:08.520
 did our AMI system back in 2010. So we have some meters that are older and the electronics

00:13:08.520 --> 00:13:13.480
 are getting older and we're having to exchange some of those meters as well.

00:13:13.480 --> 00:13:19.440
 Overall our system overall, as of when I did this PowerPoint, we had 67,000 electric meters

00:13:19.440 --> 00:13:24.800
 in the city. Most of those are residential, about 63,000 of those. And on the AMI system,

00:13:24.800 --> 00:13:29.840
 we have 13 customers that have chosen the opt-out and do not do the AMI, which means

00:13:29.840 --> 00:13:39.760
 we have to manually read those every month. And then we have about 4,700 commercial meters.

00:13:39.760 --> 00:13:45.460
 The beta was broken up into five sections. And Techline was awarded section A for the

00:13:45.460 --> 00:13:52.520
 electric meters. Texas Electric Co-ops for sections B, C, and D for electric meter sockets.

00:13:52.520 --> 00:13:56.080
 Primary Instrument Rated Transformers and Primary Instrument Rated Transformers. And

00:13:56.080 --> 00:14:01.160
 then section E was Tray Networks Inc. for our AMI equipment.

00:14:01.160 --> 00:14:18.680
 I'm curious if you would go back. Where's the previous? Secure Mesh. Could you tell

00:14:18.680 --> 00:14:25.560
 us what that is? Yes, sir. There's different technologies for automated metering infrastructure.

00:14:25.560 --> 00:14:28.600
 And there's point to point. And then there's what they call Secure Mesh. And then they

00:14:28.600 --> 00:14:36.680
 have Powerline Carrier, PLC. Secure Mesh is radio. It's basically in the, it's going

00:14:36.680 --> 00:14:43.880
 to, all the meters are going to communicate via radio from the meter point to the extender

00:14:43.880 --> 00:14:49.640
 bridge, the collector we have, and then from the collector back to the gateway. And so,

00:14:49.640 --> 00:14:57.000
 and all the, all the passing of that information is encrypted. It's got 128 bit encryption

00:14:57.000 --> 00:15:01.160
 on it. And so that's why it's called Secure Mesh. So if anybody was to try to intercept

00:15:01.160 --> 00:15:04.960
 and try to get any of those transmissions, they would need our encryption key to get

00:15:04.960 --> 00:15:12.960
 the information inside. Okay. So we have 72,000, 73,000 total meters.

00:15:12.960 --> 00:15:17.360
 How many extender bridges do we have? We have 78 extender bridges in two games.

00:15:17.360 --> 00:15:18.360
 78? Yes, sir.

00:15:18.360 --> 00:15:20.360
 That's all? Yes, sir.

00:15:20.360 --> 00:15:25.600
 Wow. That's impressive. I would have thought it had been many hundreds.

00:15:25.600 --> 00:15:29.240
 We have 78. It is growing though, because the city is growing. So we will be looking

00:15:29.240 --> 00:15:35.720
 to add some more. But we generally try to keep about 2000 meters per extender bridge.

00:15:35.720 --> 00:15:39.760
 So that we have failover. All the extender bridges are set strategically. So if one was

00:15:39.760 --> 00:15:45.040
 to go down, the others in that area could pick up those meters. A total, an extender

00:15:45.040 --> 00:15:49.400
 bridge can run about 5,000 meters total on it. But we try to keep them around 2,000 so

00:15:49.400 --> 00:15:55.840
 that we have that failover. Just in case, like I said, whatever happens, we've had poles

00:15:55.840 --> 00:16:00.920
 crashed into or stuff happen where we've lost extender bridges, lightning. Lightning happens

00:16:00.920 --> 00:16:05.520
 a lot sometimes where we lose one. So if we lose one, in the meantime, the others can pull

00:16:05.520 --> 00:16:10.680
 in all those reeds and keep our system up and robust and going with that failover.

00:16:10.680 --> 00:16:17.820
 So what radio band are they working at? So the meters themselves are 2.4 gigahertz band.

00:16:17.820 --> 00:16:26.440
 And then the extender bridges run 5.8 gigahertz. And they're in the open band, where it's unlicensed.

00:16:26.440 --> 00:16:30.280
 Some AMI systems have licensed bands. And then you have to pay for that license. And

00:16:30.280 --> 00:16:35.780
 that's an ongoing fee to pay for that license. Ours is the unlicensed band. And that's the

00:16:35.780 --> 00:16:46.880
 encryption. Unlicensed, but encrypted? Yes. OK. Yes, sir. All right. So that's kind of

00:16:46.880 --> 00:16:52.440
 what comes to questions, which those are very good questions. And any other questions that

00:16:52.440 --> 00:17:11.040
 we have? Yes, sir. To this one or back? Just got it. Go towards the ending. OK, thank you.

00:17:11.040 --> 00:17:18.060
 There, breathe. OK. So you're asking then for an additional what? This is not additional.

00:17:18.060 --> 00:17:25.400
 This is to take the place of our current bid. OK. Our current bid, sections B, C, and D,

00:17:25.400 --> 00:17:30.960
 that vendor TEC, and then section E, the trend, those were out of spend. And so when they're

00:17:30.960 --> 00:17:36.120
 out of spend, the recommendation was to bring the whole bid back to have the whole thing

00:17:36.120 --> 00:17:42.040
 rebid again instead of just certain sections of it. And so we came-- we've come back about

00:17:42.040 --> 00:17:46.320
 a year earlier than what we were expecting to come back, just because we ran out of spend.

00:17:46.320 --> 00:17:50.400
 And part of that is just because the costs of prices keep going up. Every time that we

00:17:50.400 --> 00:17:55.360
 do an order, we'd end up having to do an amendment for pricing, because we go out for pricing,

00:17:55.360 --> 00:17:59.400
 which I do the order in the same app. Pricing has changed again. You all need to do an amendment.

00:17:59.400 --> 00:18:04.320
 And so we have these ongoing price raises happening over the last couple of years on

00:18:04.320 --> 00:18:09.480
 all this equipment. Thank you. And Mr. Rybeck, this is the annual amount. What you're considering

00:18:09.480 --> 00:18:13.520
 today is a five-year amount. So you get to multiply this times five, each of these times

00:18:13.520 --> 00:18:18.000
 five, to get to the contract amount. So take those numbers times five, you're saying--

00:18:18.000 --> 00:18:21.960
 Yeah, correct. If you look at the agenda, it's a five-year award. He's just showing

00:18:21.960 --> 00:18:30.480
 this on an annual basis. Thank you. Right. So we're looking at $10, $11, $12 million

00:18:30.480 --> 00:18:36.000
 roughly for the whole package? That'd be correct. OK. Over the five-year period? Over a five-year

00:18:36.000 --> 00:18:40.360
 period. And we try to build in some contingency there, because we've looked at historical

00:18:40.360 --> 00:18:44.920
 rising cost of prices and what the vendors have been coming back with because of manufacturers

00:18:44.920 --> 00:18:51.520
 gone up on prices. When we first started our bid that we are currently in back in 2021,

00:18:51.520 --> 00:18:56.000
 we look at the prices there to the prices now. And there's many products that have doubled

00:18:56.000 --> 00:19:01.120
 in price that are twice as much as what they were. And we're still-- So what are you projecting

00:19:01.120 --> 00:19:07.040
 here over the five-year period for pricing? We built a 5% increase per year. I thought

00:19:07.040 --> 00:19:14.000
 that that was modest, but we needed to account for something. Well, I guess in some cases,

00:19:14.000 --> 00:19:18.960
 they've already doubled, so how much more can they go up? I would hope not much more,

00:19:18.960 --> 00:19:27.040
 but we've yet to see them level out. Oh, really? Every time that we've gone back in every order,

00:19:27.040 --> 00:19:33.320
 even in this last year, prices have continued to rise. So we're hoping that levels out.

00:19:33.320 --> 00:19:40.280
 We've not seen this before the pandemic, 2020, of how this dramatic a price increases. I've

00:19:40.280 --> 00:19:45.120
 been here 24 years. I've never seen prices increases like this, but it certainly ran

00:19:45.120 --> 00:19:52.360
 our contracts out of money quickly. OK, so it's potentially going to be required for

00:19:52.360 --> 00:19:58.000
 you to come back and ask for additional increases on this contract, pending additional price

00:19:58.000 --> 00:20:03.520
 increases in equipment and material. We've tried to build a contingency in there for

00:20:03.520 --> 00:20:07.600
 that, and we hope that that can cover that. But if it doesn't, then, yes, we would be

00:20:07.600 --> 00:20:13.120
 back for that. Yeah, Mr. Rybak, unlike what you heard the Water Department say, we continue

00:20:13.120 --> 00:20:18.640
 to see prices across the electric industry continue to escalate. And so we've not seen

00:20:18.640 --> 00:20:23.880
 any kind of flattening. It just continues to just build up across the entire equipment

00:20:23.880 --> 00:20:28.200
 system that we have. Well, I can appreciate that. Our food bills

00:20:28.200 --> 00:20:34.240
 up about 50 percent over two years ago. I looked at the national average between 2020

00:20:34.240 --> 00:20:42.440
 and 2024 just on inflation, and it's 20 percent in the last several years. Just on that, I

00:20:42.440 --> 00:20:48.840
 think 2021 was 4 point something, 2022 is 8 percent something, and then 2023 was 8.

00:20:48.840 --> 00:20:55.680
 And then this year is 2.6 or something like that. So we're not over that. The last quarter,

00:20:55.680 --> 00:21:01.680
 it was at 2.6 on inflation. So national inflation, we've gone up about 20 percent since our previous

00:21:01.680 --> 00:21:07.960
 contract till now. Unfortunate, but true. Thank you.

00:21:07.960 --> 00:21:13.560
 Yes, sir. Historically, and there were a number of

00:21:13.560 --> 00:21:17.640
 debt and bids in this, are debt and firms able to even compete on this stuff? Have we

00:21:17.640 --> 00:21:22.280
 been able to engage with them? In this case, we didn't get any in this one, but just for

00:21:22.280 --> 00:21:27.320
 my background knowledge. I talk about competing for the products.

00:21:27.320 --> 00:21:32.280
 With electric metering, there's usually only a handful of, say, meter manufacturers. There's

00:21:32.280 --> 00:21:36.600
 only about five in the whole United States. And then to find the ones that actually work

00:21:36.600 --> 00:21:42.080
 with our AMI system module, we're down to two out of those five. As far as other equipment

00:21:42.080 --> 00:21:48.160
 like the current transformers, potential transformers, there's also a limited number of manufacturers

00:21:48.160 --> 00:21:54.120
 to those in the United States. So a lot of this equipment, there's just a handful of

00:21:54.120 --> 00:21:58.960
 manufacturers that kind of hold the whole industry, and you're kind of limited to working

00:21:58.960 --> 00:22:05.120
 with those manufacturers and the distributors for those manufacturers.

00:22:05.120 --> 00:22:10.100
 But we would welcome more competition if someone was to bring it, because that would certainly

00:22:10.100 --> 00:22:14.400
 help with the pricing, if they had some more competition than what they have.

00:22:14.400 --> 00:22:25.920
 Mr. Chairman. So you've had a 5% increase, hoping that that would cover it. It looks

00:22:25.920 --> 00:22:32.000
 like it's not going to. Is it your thought that next year, when we start this again,

00:22:32.000 --> 00:22:38.040
 you feel comfortable with the 5% knowing that you'd possibly be coming back to us with more

00:22:38.040 --> 00:22:45.520
 alterations, or are you thinking about going to a higher number than the 5% for protection?

00:22:45.520 --> 00:22:49.880
 I think in the current contract that we're in, we didn't have that, the current meter

00:22:49.880 --> 00:22:53.840
 bid that we ran out of money. And so we tried to build that into this one so that we would

00:22:53.840 --> 00:23:01.240
 have that and in the hopes that it would be enough to cover that. And like I said, all

00:23:01.240 --> 00:23:07.440
 we can do is project and go off of our best projection without looking to the future.

00:23:07.440 --> 00:23:13.120
 It's unknown, but we just look at our historicals and try to go off of what we've seen in the

00:23:13.120 --> 00:23:17.800
 last couple of years. But also knowing the last couple of years is a departure from what

00:23:17.800 --> 00:23:23.200
 everything was before those years as far as pricing and hoping that we will level out

00:23:23.200 --> 00:23:29.600
 at some point. That's the hope that these prices don't continue, hoping there's going

00:23:29.600 --> 00:23:34.120
 to be a leveling. And if it will level out in price and kind of hold a closer price,

00:23:34.120 --> 00:23:36.960
 then yes, this money will be enough.

00:23:36.960 --> 00:23:41.760
 So you feel comfortable with going with this procedure and then possibly seeing us more

00:23:41.760 --> 00:23:46.160
 often than we've seen you before just because of the market?

00:23:46.160 --> 00:23:48.400
 That could be possible. I'd be comfortable coming back and talking to you.

00:23:48.400 --> 00:23:52.040
 Well, I'm just saying, right back and made that come in. I have no problem with it. It's

00:23:52.040 --> 00:23:53.040
 good to see you. Just curious.

00:23:53.040 --> 00:23:57.560
 Well, Mr. Rainer, that's one of the reasons why we do an initial three-year contract.

00:23:57.560 --> 00:24:02.000
 If we see prices escalate too much, if we see more demand than we anticipated that we

00:24:02.000 --> 00:24:06.200
 think might be worthwhile, us going out for rebid, we can do that after the additional

00:24:06.200 --> 00:24:08.600
 term of three years. Yes, sir.

00:24:08.600 --> 00:24:09.600
 Commissioner Ruddick.

00:24:09.600 --> 00:24:14.280
 Yes. I was wondering, so we're committed to this Trillion Network, obviously, for this

00:24:14.280 --> 00:24:21.880
 data gathering. So really don't have much leverage over them in terms of seeking another

00:24:21.880 --> 00:24:22.880
 vendor or competition for that.

00:24:22.880 --> 00:24:28.520
 Right. They kind of have a monopoly on their equipment and then the modules that go in

00:24:28.520 --> 00:24:31.240
 the meters for that equipment.

00:24:31.240 --> 00:24:34.480
 Have their rate increases been a little more moderate?

00:24:34.480 --> 00:24:39.120
 Yours has not been all that bad in the pricing. When I looked at theirs, actually their price

00:24:39.120 --> 00:24:44.440
 increases have been only about 3% per year and stuff like that. And so it hasn't been

00:24:44.440 --> 00:24:50.160
 as high a jumps as we've seen, particularly with meter basis and current transformers

00:24:50.160 --> 00:24:54.200
 and potential transformers. That's where we saw the biggest increases where things are

00:24:54.200 --> 00:25:00.120
 double in price from where our current contract is to the proposal of this one.

00:25:00.120 --> 00:25:06.760
 Mr. Ruddick, the AMI system is something that DME implemented, what, 10 years ago, 20 years

00:25:06.760 --> 00:25:07.760
 ago now, I guess.

00:25:07.760 --> 00:25:13.600
 Starting 2010 is a five-year rollout. We completed it. It had 100% complete in 2015.

00:25:13.600 --> 00:25:21.600
 So we do have in our CIP out in the out years $40 million to look at a new AMI system. We

00:25:21.600 --> 00:25:26.760
 continue to push that out because the system is doing what we need it to do. But at some

00:25:26.760 --> 00:25:32.280
 point, we probably need to look at just refreshing that and maybe looking at another system because

00:25:32.280 --> 00:25:36.540
 there have been technology improvements. The water department is currently looking and

00:25:36.540 --> 00:25:40.600
 implementing AMI as well. So there might be some opportunities there for us to leverage

00:25:40.600 --> 00:25:45.400
 with them. But again, I think right now the cheaper route is to continue to keep the system

00:25:45.400 --> 00:25:49.040
 that we have. It's doing the work that we need it to do and postpone that $40 million.

00:25:49.040 --> 00:25:57.280
 As long as their rate increases have been more normal and acceptable. Some of the rate

00:25:57.280 --> 00:26:05.560
 increases we saw with the chemicals, it was eight times in one year. That's big. Anyway,

00:26:05.560 --> 00:26:09.600
 I don't have anything else. Thank you.

00:26:09.600 --> 00:26:18.480
 Any further questions? We'll consider these items individually. I would take a motion

00:26:18.480 --> 00:26:29.040
 for item D. So moved. Mr. Ryback moves. Second. Anybody? Mr. Plotk seconds. All in favor?

00:26:29.040 --> 00:26:40.560
 All are. The vote is unanimous for item E. I would consider a motion. Second. Motion

00:26:40.560 --> 00:26:52.000
 is second. All in favor? Unanimously again. And for item E, a motion? I'm sorry. Item

00:26:52.000 --> 00:27:02.400
 F. You're right. Who's the motion? I'm sorry. Oh, okay. Commissioner Plotk, second. All

00:27:02.400 --> 00:27:11.720
 in favor? Also passes unanimously. Moving on to items for individual consideration. Item

00:27:11.720 --> 00:27:23.960
 A, consider approval of the November 18, 2024 minutes. Is there a motion? Commissioner Newquist

00:27:23.960 --> 00:27:33.480
 and second by Ryback. All in favor? All are. Passes. And item B, consider adoption of an

00:27:33.480 --> 00:27:38.560
 ordinance from the city of Denton authorizing city manager to execute a CMAR guaranteed

00:27:38.560 --> 00:27:48.000
 maximum price contract, price amendment number three to CMAR contract with Sunt Construction

00:27:48.000 --> 00:27:53.000
 for let's see, construction phase services of the third work package for neighborhood

00:27:53.000 --> 00:27:58.600
 two and six improvements. Good morning board members. Scott Feddick, senior project manager

00:27:58.600 --> 00:28:04.760
 with capital projects. As you stated here this morning for consideration for an amendment

00:28:04.760 --> 00:28:10.040
 to the contract for neighborhood two and six for GMP three or guaranteed maximum price

00:28:10.040 --> 00:28:17.800
 number three. Neighborhood two and six is part of the 2019 bond program. So a little

00:28:17.800 --> 00:28:23.840
 bit about two and six project. The area that we're taking place for three you can see on

00:28:23.840 --> 00:28:30.200
 the map is indicated by the dotted black line. This overall project takes place primarily

00:28:30.200 --> 00:28:35.520
 in the southwest quadrant of the city of Denton. Some of the major streets with package three

00:28:35.520 --> 00:28:43.720
 will be Sunset, Cordell, Congress and Scripture. With this project we'll be doing 49 roadway

00:28:43.720 --> 00:28:49.280
 segments for reconstruction. There's about 11,000 feet of water main replacements, 8,300

00:28:49.280 --> 00:28:54.280
 feet of wastewater replacement, about 3,000 square yards of sidewalk replacement and then

00:28:54.280 --> 00:29:02.120
 we'll also be looking at doing some sidewalk lighting and installation. So the GMP three

00:29:02.120 --> 00:29:08.100
 overall cost, cost of work was just over 21 million. We had the contingencies for owner

00:29:08.100 --> 00:29:20.760
 and Seymour with allowances. Total contract amount was 28 million, 145, 415 cents. Kind

00:29:20.760 --> 00:29:28.920
 of a little bit about the... Could you go back please? Yes sir. What is the CMR's contingency?

00:29:28.920 --> 00:29:34.820
 So that is, that is an allowance that allows them to use money that is for items that come

00:29:34.820 --> 00:29:39.800
 up within the project that are related to the project. So just for a simple example,

00:29:39.800 --> 00:29:45.320
 when we're working in the UNT area, we started noticing that students are trying to get into

00:29:45.320 --> 00:29:51.280
 the construction area. We didn't perceive that so they needed to get some fencing to

00:29:51.280 --> 00:29:55.600
 put up and UNT requested fencing so we allowed them to use that contingency to go out and

00:29:55.600 --> 00:30:00.960
 rent some chain link fencing and areas to protect the students in the project area.

00:30:00.960 --> 00:30:06.240
 So things like that that benefit the project. Okay so are allowances then from previous

00:30:06.240 --> 00:30:12.120
 risk contingency expenditures? Yeah so allowances, yeah so when we, we look at what the risk

00:30:12.120 --> 00:30:18.720
 may be so just for example like say mailboxes, a bunch of mailboxes along the side of a street

00:30:18.720 --> 00:30:21.400
 that we could possibly damage as we go down through there but we don't know that we're

00:30:21.400 --> 00:30:26.960
 going to for sure. So we put that in an allowance so if that would happen, we have individual

00:30:26.960 --> 00:30:31.700
 lines that could use that money to fix that mailbox and if we don't use any of it, that

00:30:31.700 --> 00:30:36.080
 money all reverts back to the city. That allows us to bring that money back versus have a

00:30:36.080 --> 00:30:42.040
 line item that would get paid out in full for something we may or may not do. Okay so

00:30:42.040 --> 00:30:50.920
 if you'll excuse me just working through this, so the construction fee is not the same as

00:30:50.920 --> 00:30:56.400
 the general condition so the general contractor is being paid for their general conditions,

00:30:56.400 --> 00:31:02.080
 the construction fee goes to the CMR? Yes so it's, yeah it's a figure on the total cost

00:31:02.080 --> 00:31:06.120
 of the project and then yes and then anything that's not used for that percentage would

00:31:06.120 --> 00:31:15.240
 also revert back to the city and then the project for the construction fee. Okay thank

00:31:15.240 --> 00:31:21.920
 you. Mr. Chair, so if I understand on the contingency that would let's say the chain

00:31:21.920 --> 00:31:27.520
 link fence as you mentioned, but the mailboxes fall under the allowances? Right, right. It

00:31:27.520 --> 00:31:33.200
 is a risk that we identified, you know the allowances are risks that we identified during

00:31:33.200 --> 00:31:38.600
 the project design. So as you're aware with the CMR, we bring on the CMR design firm and

00:31:38.600 --> 00:31:43.000
 we all do it together. So constructability they're looking at, well this is a possibility

00:31:43.000 --> 00:31:48.680
 we might have to do this or you know sweeping or whatever you know that we may or may not

00:31:48.680 --> 00:31:55.560
 have to do is added as an allowance versus a solid bid on that line on them. So an event

00:31:55.560 --> 00:32:00.800
 like the chain link fence just caught everybody by surprise because of the clientele in the

00:32:00.800 --> 00:32:04.760
 neighborhood? Right that wasn't really expected. Students or students? Right, wasn't really

00:32:04.760 --> 00:32:11.480
 expected so that is a way allowed to use contingency. Thank you for that. Mr. Chair, concerning

00:32:11.480 --> 00:32:17.520
 the contingency what you said the word we permit them to access the contingency, is

00:32:17.520 --> 00:32:21.200
 there a comeback process to us to where they're telling us hey we're going or do they have

00:32:21.200 --> 00:32:25.320
 some unilateral discretion to go ahead and access it? How does that work? How do we know

00:32:25.320 --> 00:32:30.280
 when they're tapping that? Yes, so we are required to let us know what they're going

00:32:30.280 --> 00:32:35.360
 to use it for, vet out, give us cost, they provide the cost estimates and everything

00:32:35.360 --> 00:32:46.640
 to us and then we say okay yeah we agree this is a valid use of contingency. Good. All right

00:32:46.640 --> 00:32:51.400
 so a little bit about our project schedule. Like I said this is the third and final GMP

00:32:51.400 --> 00:32:59.640
 for this project. GMP number one we started construction in November of 23, sorry December

00:32:59.640 --> 00:33:07.760
 of 23. GMP number two we started construction in May of 24. We are with an approval here

00:33:07.760 --> 00:33:14.280
 we're going to go to council on the 17th and with that if we get an approval we would start

00:33:14.280 --> 00:33:21.000
 GMP construction probably sometime in January quarter one of 2025. Overall project we are

00:33:21.000 --> 00:33:29.960
 expecting a total completion of the project in quarter four of 2026. So will that be the

00:33:29.960 --> 00:33:35.400
 complete expenditure then of the 2019 bond? Will that complete it? We'll not complete

00:33:35.400 --> 00:33:42.760
 the bond just this project. Okay and how much more of the bond is left to be executed? So

00:33:42.760 --> 00:33:47.720
 we do have a few more projects left. There's the neighborhood 5A project, we've got the

00:33:47.720 --> 00:33:54.480
 neighborhood 5B and also the Oakland drainage is part of that project. There's a still in

00:33:54.480 --> 00:33:58.800
 in progress the neighborhood four project. We have a few projects that were associated

00:33:58.800 --> 00:34:06.920
 with it that we have on hold right now with funding and they may get pushed but so majority

00:34:06.920 --> 00:34:12.960
 of it we're getting there so we're getting the majority of it is under construction or

00:34:12.960 --> 00:34:18.640
 in design. Okay so that 2019 bond when do we more or less anticipate that those projects

00:34:18.640 --> 00:34:26.640
 will be completed? I think with the Oakland 5B Seth you may have to help me this is 28

00:34:26.640 --> 00:34:38.120
 27 I know for sure into 27 28 for that project. I just want to get a general idea. Okay with

00:34:38.120 --> 00:34:43.440
 that staff recommendation would be an amendment to the contract with Sunt Construction for

00:34:43.440 --> 00:34:52.200
 the GMP number three total not to exceed amount of $28,145,400.15 that does include the owners

00:34:52.200 --> 00:35:03.400
 contingency of one million dollars. And any additional questions? Any further questions?

00:35:03.400 --> 00:35:20.240
 Or a motion? Mr. Ryback moves second. Nucleus seconds. All in favor? Aye. Opposed? None.

00:35:20.240 --> 00:35:27.280
 Motion B passes. Now we'll move to item C. Consider recommending adoption of an ordinance

00:35:27.280 --> 00:35:33.480
 to the city of Denton authorizing the city manager to execute a contact with Tiseo Paving

00:35:33.480 --> 00:35:40.640
 for construction of Bonnie Bray phase six improvement project for a total amount not

00:35:40.640 --> 00:36:02.360
 to exceed $38,688,093.66. Good morning public utility board members my name is Jesus Perez

00:36:02.360 --> 00:36:07.520
 I'm a project manager with capital projects and I'll be introducing the Bonnie Bray phase

00:36:07.520 --> 00:36:12.800
 six improvement project to you and the utilities that we will construct within its project

00:36:12.800 --> 00:36:21.280
 limits. On Bonnie Bray the scope will be to widen to a four-lane divided roadway from

00:36:21.280 --> 00:36:27.800
 University Drive all the way to Elm Street and within those project limits there will

00:36:27.800 --> 00:36:36.760
 be a total of 2,600 linear feet of new water mains and also a total of 11,600 linear feet

00:36:36.760 --> 00:36:43.200
 of new stormwater mains. On the scope on Rainey Road of course it would be to widen it to

00:36:43.200 --> 00:36:49.600
 three lane a three lane roadway meaning there will be a turn lane in between from the Bonnie

00:36:49.600 --> 00:36:58.600
 Bray intersection and Rainey Road to about 120 feet west of the Hardaway Road intersection.

00:36:58.600 --> 00:37:03.240
 Within those project limits we will install about a thousand linear feet of new water

00:37:03.240 --> 00:37:13.400
 mains and also a total of 800 feet of stormwater upgrades. The bid opening for this project

00:37:13.400 --> 00:37:20.560
 was conducted on August 28th 2024. At the time there was only two bids that were received

00:37:20.560 --> 00:37:28.960
 and opened by procurement. The lowest bidder at the time it was from Tizio Paving Company.

00:37:28.960 --> 00:37:35.560
 All the bids and supporting documentation was collected by procurement and then sent

00:37:35.560 --> 00:37:41.880
 to the Texas Department of Transportation for their approval. Once we received approval

00:37:41.880 --> 00:37:50.920
 we had the go ahead to move towards construction. The base bid submitted by Tizio Paving at

00:37:50.920 --> 00:38:05.840
 that time was for $36,845,803.49. The funding sources for this project are coming from a

00:38:05.840 --> 00:38:12.040
 couple of different sources. The first one being the 2019 General Obligation Fund. There

00:38:12.040 --> 00:38:19.680
 is some Federal Highway Administration funding and there is Denton ISD funding that's coming

00:38:19.680 --> 00:38:27.640
 through an ILA, Interlocal Agreement between the City and the school for the Riney Road

00:38:27.640 --> 00:38:36.320
 segment. The upcoming schedule for the project of course will be to go before City Council

00:38:36.320 --> 00:38:43.880
 on December 17th to recommend award to the contractor. Shortly thereafter we will issue

00:38:43.880 --> 00:38:50.040
 a partial notice to proceed for the contractor to start ordering materials with a lot of

00:38:50.040 --> 00:38:56.840
 lead time. Once we are in January the City will issue the full notice to proceed to the

00:38:56.840 --> 00:39:04.760
 contractor so he can begin full mobilization into the areas that we need them to. What

00:39:04.760 --> 00:39:11.920
 I mean by that is that we have built in milestones into the project manual. There's three key

00:39:11.920 --> 00:39:21.720
 milestones that he must meet time frame so that time is of the essence. The contractor

00:39:21.720 --> 00:39:28.680
 asked for the total project, the contractor will have a total of two and a half years

00:39:28.680 --> 00:39:38.440
 to complete. I have a couple of quick questions. The contractor that we plan to award to Tizio

00:39:38.440 --> 00:39:47.000
 Paving does the City have any experience working with them? No sir. Asking around with my project

00:39:47.000 --> 00:39:53.000
 manager team, I have not had any experience with them and neither has my team. The only

00:39:53.000 --> 00:40:00.440
 person that I met that has had previous experience with Tizio Paving was the public works inspector

00:40:00.440 --> 00:40:09.960
 supervisor and he's dealt with them so I guess we will all have our first experience

00:40:09.960 --> 00:40:15.000
 with them. Okay well I'm curious because their bid was significantly lower than the other

00:40:15.000 --> 00:40:22.520
 bidder. About 30 something percent. It's always a little scary. It's good for the taxpayer

00:40:22.520 --> 00:40:26.480
 but it could be scary for performance. And the other thing I was wondering, you mentioned

00:40:26.480 --> 00:40:32.440
 Riley Road. I didn't see that on the map that you showed us. Did I miss it? It's a very

00:40:32.440 --> 00:40:40.640
 short segment. It's where the drive in theater used to be. I'll have to take your word for

00:40:40.640 --> 00:40:52.320
 that. That's where I saw Rambo. Oh there it is. Right there. That little, right by the

00:40:52.320 --> 00:41:00.960
 high school. Well the new elementary school. Like I said earlier the interlocal agreement

00:41:00.960 --> 00:41:07.120
 is basically the agreement between the City and Denton ISD to construct Rainey Road. So

00:41:07.120 --> 00:41:12.840
 right in front of the new elementary school frontage it goes actually from three lanes

00:41:12.840 --> 00:41:20.060
 to four lanes. So the project kind of builds a deceleration lane into their first driveway.

00:41:20.060 --> 00:41:26.880
 So that's where I talk about that is the little section of Rainey Road that we are constructing.

00:41:26.880 --> 00:41:34.920
 Okay so it's just that little leg that's why I missed it. Thank you. Mr. Chair a couple

00:41:34.920 --> 00:41:45.500
 of questions. To dovetail Mr. Rayback on were both of these companies, are they, so one

00:41:45.500 --> 00:41:52.120
 is not on our LSER approved list per se. This is a brand new venture with him. What about

00:41:52.120 --> 00:42:00.040
 Ed Bell? Are they in our primary, secondary, are they on the list? Where are they? I've

00:42:00.040 --> 00:42:06.100
 only been here with the City of Denton for two years and in the Metroplex so I have no

00:42:06.100 --> 00:42:12.520
 experience with contractors that would submit their bids so I have also no information for

00:42:12.520 --> 00:42:19.560
 Ed Bell construction but I'll let Seth. Good morning board members. Seth Garcia, Deputy

00:42:19.560 --> 00:42:23.960
 Director of Cal4Project. So both are very well qualified contractors. They do a lot

00:42:23.960 --> 00:42:28.580
 of work in the Metroplex. As work shrinking in the Metroplex we're seeing some of them

00:42:28.580 --> 00:42:34.200
 continue to come north as we're continuing to put out projects. Mr. Rayback to your point

00:42:34.200 --> 00:42:41.060
 I think Ed Bell's construction number is actually high and what we had the OPC was closer to

00:42:41.060 --> 00:42:48.400
 Tizio Paving so really we were within I think less than a percent of our engineers estimate

00:42:48.400 --> 00:42:54.620
 for Tizio's number. Those FHWA funds that we have received for this project put additional

00:42:54.620 --> 00:42:59.760
 stipulations on the contractors that we think weeded out some of the bids that we would

00:42:59.760 --> 00:43:04.580
 normally receive from some of our normal players so again getting two on a project this size

00:43:04.580 --> 00:43:11.040
 and complexity we felt comfortable with these numbers. So if I may ask then on another point

00:43:11.040 --> 00:43:22.040
 on the Denton ISD and the federal housing funding housing highway pardon me no my occupation

00:43:22.040 --> 00:43:30.680
 are those costs include are those included in this? Yes sir so part of let me switch

00:43:30.680 --> 00:43:35.920
 over to his funding. I'm just looking are we getting a little relief from those? Absolutely

00:43:35.920 --> 00:43:40.840
 so I believe so it's gonna be more than the 36. The contract amount is correct the city

00:43:40.840 --> 00:43:45.840
's portion of that contract amount is what is less so from Denton ISD I believe we got

00:43:45.840 --> 00:43:51.800
 a little over 1.5 million to build their portion of Riney Road again the L.A. calls for a true

00:43:51.800 --> 00:43:57.000
 up process so once we actually receive bids we'll true up against the number that they

00:43:57.000 --> 00:44:01.220
 fronted us to make sure they're covering all portions of costs and anything that they go

00:44:01.220 --> 00:44:07.200
 over for their portion they will reimburse back to the city. The FHWA funds was a little

00:44:07.200 --> 00:44:14.360
 over 9 million dollars for construction and total we had 11.9 million so add those together

00:44:14.360 --> 00:44:19.760
 the city's portions roughly 25 million. That helps a lot. Absolutely sorry we didn't break

00:44:19.760 --> 00:44:26.440
 that down a little bit clearer. Thank you. Question please. Go ahead. When that FHA money

00:44:26.440 --> 00:44:31.400
 that federal highway when does that come is that on progress are they in first and we're

00:44:31.400 --> 00:44:36.980
 in last how's that work? Yep so it's reimbursable the 2 million of that came through right away

00:44:36.980 --> 00:44:44.320
 so again once we procure and issue the funds we show we submit it to our transportation

00:44:44.320 --> 00:44:49.980
 consultant who provides it to TxDOT the local area office reviews it it goes to Austin for

00:44:49.980 --> 00:44:55.720
 final approval and then we receive reimbursement back. So essentially we'll use a portion of

00:44:55.720 --> 00:45:00.900
 the 25 million we have set into the project to front the money and then we'll do reimbursements

00:45:00.900 --> 00:45:11.360
 on a monthly basis as we go through. Any further questions? Thank you sir. So this project is

00:45:11.360 --> 00:45:15.880
 adjacent to the Denton High School which has a couple of thousand cars a day entering and

00:45:15.880 --> 00:45:20.040
 leaving and then it's also next to the new elementary school. Is the new elementary school

00:45:20.040 --> 00:45:26.700
 being constructed? It's in the same alignment Bronco West of the intersection of Rainey

00:45:26.700 --> 00:45:32.240
 Road and Bronco Way. You go on Bronco Way to the high school and then if you go east

00:45:32.240 --> 00:45:37.200
 of the intersection you will be arriving at the new elementary school that is to open

00:45:37.200 --> 00:45:44.480
 on August 20 August 2025. Okay so there there is a lot of traffic like very heavy daily

00:45:44.480 --> 00:45:49.320
 traffic to consider here. I'm assuming there's there's a phasing plan that allows all of

00:45:49.320 --> 00:45:57.720
 that traffic to to flow without creating. Yes and that's what I spoke earlier about

00:45:57.720 --> 00:46:03.440
 the milestones that were built into the project the project manual. So the intersection of

00:46:03.440 --> 00:46:09.460
 Rainey Road and Bonnie Bray in essence becomes the most important the most critical intersection.

00:46:09.460 --> 00:46:17.680
 So there will be a temporary asphalt pavement built on the west side of the intersection.

00:46:17.680 --> 00:46:22.920
 So as that is being built the traffic that is approaching the intersection will be allowed

00:46:22.920 --> 00:46:30.260
 to go westbound eastbound and still northbound. They'll still have the same way of the same

00:46:30.260 --> 00:46:36.380
 pattern as we built this temporary asphalt pavement around it. So once the temporary

00:46:36.380 --> 00:46:42.280
 asphalt pavement is ready we'll flip the traffic and now the traffic will now be on the temporary

00:46:42.280 --> 00:46:47.840
 pavement going around the intersection and the contractor will fully close the intersection

00:46:47.840 --> 00:46:55.800
 and completely tear tear up and start rebuilding the road and into a much wider because Rainey

00:46:55.800 --> 00:47:02.160
 Road will be a traffic controlled light intersection. I'm glad to hear I was afraid it was going

00:47:02.160 --> 00:47:15.360
 to be a four-way stop sign. All right thank you. Yes let me so I think this is the slide

00:47:15.360 --> 00:47:21.800
 that I was in. So the staff recommendation would be to authorize the construction contract

00:47:21.800 --> 00:47:28.000
 with Tizio Paving both for the base bid and the owner's contingency of five percent. So

00:47:28.000 --> 00:47:33.560
 the total contract notice not to exceed amount will be thirty eight million six hundred and

00:47:33.560 --> 00:47:40.840
 eighty eight thousand and ninety three dollars and sixty six cents. And any open up for any

00:47:40.840 --> 00:47:47.280
 further questions that you might have any further questions. It's one last school related

00:47:47.280 --> 00:47:54.920
 question are there sidewalks in the plan along Bonnie Bray and Rainey Road. Yes the the whole

00:47:54.920 --> 00:48:04.360
 length of Bonnie Bray there we have plans to widen to the eight foot walking path. I

00:48:04.360 --> 00:48:10.320
 on both sides I believe and Rainey Road also on Rainey Road on the south side of running

00:48:10.320 --> 00:48:21.520
 road going to the intersection also gets a eight foot walking path. Thank you. Yeah can

00:48:21.520 --> 00:48:37.160
 you go back to the time frame. There are no further questions. Chair would entertain a

00:48:37.160 --> 00:48:46.960
 motion to move. We have a motion. Second. All in favor. Any opposed. Motion carries

00:48:46.960 --> 00:48:54.840
 unanimously on to management reports Mr. Chair. We have a couple of items that we've provided

00:48:54.840 --> 00:49:01.360
 to you as follow ups. There was a memo on customer distribution for DMA. I think Mr.

00:49:01.360 --> 00:49:05.960
 Taylor had requested that there was also a follow up memo to a question that Mr. Ryback

00:49:05.960 --> 00:49:13.740
 had and we have staff here. If there's any questions you have on either those memos questions

00:49:13.740 --> 00:49:22.260
 first. Oh yeah so I appreciate the information and I noticed the categories were residential

00:49:22.260 --> 00:49:29.120
 commercial industrial. I assume industrial is just the size of peak load or size of demand.

00:49:29.120 --> 00:49:37.800
 That's correct. Okay. Thank you. Yes I have a question about the memo. I'm sorry go ahead.

00:49:37.800 --> 00:49:45.720
 What is a miscellaneous account in the pie chart. Let me ask Melissa to get up here and

00:49:45.720 --> 00:49:52.240
 give you that answer. Good morning members. My name is Melissa with DME. Miscellaneous

00:49:52.240 --> 00:49:57.760
 is essentially broken up between lighting and then we also have like the temporary service

00:49:57.760 --> 00:50:11.560
 meters as well. It's just a break up of those. Any other questions on that one. Thank you.

00:50:11.560 --> 00:50:17.720
 Yes I'm the one who requested the information regarding the filter repairs at Lewisville

00:50:17.720 --> 00:50:24.280
 plant and I noticed that there was no start date as to when that occurred and was start

00:50:24.280 --> 00:50:31.080
 date for the water restrictions. Is anybody from the water department here who can. Yeah

00:50:31.080 --> 00:50:36.480
 I don't see anybody from the water department here. I do apologize for that. But I'll go

00:50:36.480 --> 00:50:40.480
 ahead and take your question and we'll get get a response back to you on that. The reason

00:50:40.480 --> 00:50:45.560
 for my asking is when we were first reported to us this failure had occurred and there

00:50:45.560 --> 00:50:50.080
 was a repair of the contractor who was doing that work was going to be kept on site and

00:50:50.080 --> 00:50:54.360
 the whole thing would be wrapped up in a couple of weeks. Well it doesn't look like it was

00:50:54.360 --> 00:51:00.000
 a couple of weeks. So maybe we need to know more about why it took longer to take place.

00:51:00.000 --> 00:51:04.640
 Yeah we'll get with with Stephen and Chris Carroll to get your response on that. Appreciate

00:51:04.640 --> 00:51:16.800
 that. Thank you. Yeah so the only other items that we have on here. So today's the final

00:51:16.800 --> 00:51:26.560
 meeting of 2024. Your next meeting scheduled for January 13th and we'll try to populate

00:51:26.560 --> 00:51:32.520
 that calendar for you. But shortly after the beginning of the year we begin the budget

00:51:32.520 --> 00:51:37.640
 process and we'll be back in the whole process for all the utilities and look forward to

00:51:37.640 --> 00:51:42.640
 having conversations with you about about the next year's budget. So with that happy

00:51:42.640 --> 00:51:49.680
 answer any other questions you may have. Okay seeing no more questions chair would entertain

00:51:49.680 --> 00:51:54.040
 a motion to adjourn. We are adjourned.