00:00:00.000 --> 00:00:09.280
 Good morning, and welcome to the Public Utility Board meeting of the City of Denton, Monday,

00:00:09.280 --> 00:00:10.280
 August 12, 2024.

00:00:10.280 --> 00:00:19.000
 It is 9 a.m., and we'll see if there is, are there any comments from the public or any

00:00:19.000 --> 00:00:20.000
 comments written down?

00:00:20.000 --> 00:00:24.000
 It doesn't appear to be, so we'll move right on to the regular meeting.

00:00:24.000 --> 00:00:27.160
 There are no presentations from the public.

00:00:27.160 --> 00:00:34.480
 The Consent Agenda, would anyone like to pull any item from the Consent Agenda?

00:00:34.480 --> 00:00:36.480
 Does not appear to be.

00:00:36.480 --> 00:00:37.480
 Nice.

00:00:37.480 --> 00:00:40.120
 We'll move on to items for individual consideration.

00:00:40.120 --> 00:00:50.480
 We do have a, item C and D, I believe, that if there are any questions about the Power

00:00:50.480 --> 00:00:54.520
 Purchase Agreement or the Lease Agreement, then we'll need to go into closed session.

00:00:54.520 --> 00:01:03.240
 Yeah, I'm just, yeah, I'm just, I'm just making sure everybody's aware that if we have any

00:01:03.240 --> 00:01:07.520
 technical questions about those, we need to move, we'll move into closed session for those

00:01:07.520 --> 00:01:08.520
 items.

00:01:08.520 --> 00:01:18.360
 All right, we have item, item A, which is, oh, sorry, skipped right over.

00:01:18.360 --> 00:01:24.080
 So do I have a motion to approve the Consent Agenda?

00:01:24.080 --> 00:01:25.080
 Second.

00:01:25.080 --> 00:01:29.800
 Motion and a second, all those in favor, please say aye.

00:01:29.800 --> 00:01:30.800
 Aye.

00:01:30.800 --> 00:01:31.800
 Any opposed?

00:01:31.800 --> 00:01:32.800
 Okay.

00:01:32.800 --> 00:01:37.640
 As there is none, we will move on to items for individual consideration.

00:01:37.640 --> 00:01:41.840
 Item A, consider approval of the July 22nd, 2024 minutes.

00:01:41.840 --> 00:01:43.640
 Are there any changes?

00:01:43.640 --> 00:01:44.640
 We have a motion.

00:01:44.640 --> 00:01:45.640
 Second.

00:01:45.640 --> 00:01:46.640
 And a second.

00:01:46.640 --> 00:01:48.920
 All those in favor, please say aye.

00:01:48.920 --> 00:01:49.920
 Aye.

00:01:49.920 --> 00:01:50.920
 Any opposed?

00:01:50.920 --> 00:01:51.920
 Sign the same.

00:01:51.920 --> 00:01:57.120
 We'll move on to item B. Consider recommending adoption of an ordinance to the City of Dittin,

00:01:57.120 --> 00:02:00.960
 Texas, approving the execution and delivery of a financing agreement with the Texas Water

00:02:00.960 --> 00:02:08.280
 Development Board.

00:02:08.280 --> 00:02:09.280
 Good morning.

00:02:09.280 --> 00:02:17.600
 I'm Stephen Gay, Director of Water Utilities, and we're, so the project overview is Lake

00:02:17.600 --> 00:02:25.920
 Ray Roberts was constructed in 2002, its current capacity is 20 million gallons a day.

00:02:25.920 --> 00:02:29.920
 And based off of our recent master planning where we looked at our growth projections

00:02:29.920 --> 00:02:35.000
 with the municipal utility districts, the development of hunter coal, and a lot of other

00:02:35.000 --> 00:02:41.480
 growth within our corporate limits, we are anticipating the need for additional water

00:02:41.480 --> 00:02:43.880
 treatment capacity.

00:02:43.880 --> 00:02:48.720
 The planned expansion project will increase the treatment capacity at the site by 20 million

00:02:48.720 --> 00:02:54.760
 gallons a day, and we're reserving capacity an additional 30 million gallons a day so

00:02:54.760 --> 00:02:59.320
 we can add the capacity as we need it as growth demands.

00:02:59.320 --> 00:03:03.680
 So the total new capacity at the site is going to be 50 million gallons, so we currently

00:03:03.680 --> 00:03:04.680
 have 20.

00:03:04.680 --> 00:03:08.300
 We're going to add the 30, or if we have 30, we're going to have 20.

00:03:08.300 --> 00:03:12.720
 And then the combined capacity is going to be right at 70 million gallons a day, and

00:03:12.720 --> 00:03:19.840
 the current cost of the project is roughly 195 million gallons, 195 million dollars.

00:03:19.840 --> 00:03:23.720
 So with that, I'm going to go ahead and I'm going to turn it over to Viz with our finance

00:03:23.720 --> 00:03:30.060
 team and let him go over the financing piece of it.

00:03:30.060 --> 00:03:31.060
 Good morning.

00:03:31.060 --> 00:03:35.600
 I'm Viz Papandavong, ADF Finance, and I'm here to talk about the benefits of the SWIFT

00:03:35.600 --> 00:03:36.600
 loan.

00:03:36.600 --> 00:03:42.680
 So a few things, looking at the slide, divertification of our finance portfolio, and also we're

00:03:42.680 --> 00:03:47.560
 there's a big interest saving component to this loan since it's running through the federal

00:03:47.560 --> 00:03:49.120
 government basically.

00:03:49.120 --> 00:03:55.840
 So we came back a few months ago just on the intention of applying.

00:03:55.840 --> 00:03:59.640
 Now we're here for the actual signing of the financing agreement.

00:03:59.640 --> 00:04:04.880
 This basically provides a commitment with Texas Water Development Board to kind of be

00:04:04.880 --> 00:04:10.880
 committed to getting the loans through them basically pretty much.

00:04:10.880 --> 00:04:14.360
 So a little bit more about the financing agreement this time around.

00:04:14.360 --> 00:04:19.120
 So we're going to basically looking at about $10.1 million loan through the Texas Water

00:04:19.120 --> 00:04:22.480
 Development Board, and this will be done annually.

00:04:22.480 --> 00:04:27.280
 So the city chose to look at it on an annual basis versus committing through the whole five

00:04:27.280 --> 00:04:28.280
 years.

00:04:28.280 --> 00:04:32.040
 So every single year we'll come back and basically look at these dollars, looking at the five

00:04:32.040 --> 00:04:36.560
 year schedule to say, "Hey, do we want to go through with this loan, signing the financing

00:04:36.560 --> 00:04:39.600
 agreement and looking at the terms and saying, "Yes, we want to do this," and kind of move

00:04:39.600 --> 00:04:43.400
 forward.

00:04:43.400 --> 00:04:45.160
 Here is just a little bit of the timeline.

00:04:45.160 --> 00:04:51.920
 So next week we'll go to council and get approval for finance agreement, and here is just the

00:04:51.920 --> 00:04:53.800
 outline of the next few months.

00:04:53.800 --> 00:04:58.720
 So if everything goes well and goes through, then we'll pretty much get the cash sum around

00:04:58.720 --> 00:05:05.240
 at the end of the calendar year.

00:05:05.240 --> 00:05:11.920
 And here are some just the potential penalties if we decide not to go through after signing

00:05:11.920 --> 00:05:13.640
 the finance agreement.

00:05:13.640 --> 00:05:22.200
 We don't anticipate that, but this is just something we want to disclose to the city.

00:05:22.200 --> 00:05:23.200
 And that's it.

00:05:23.200 --> 00:05:24.200
 Any questions?

00:05:24.200 --> 00:05:39.240
 Mr. Neuquist.

00:05:39.240 --> 00:05:43.000
 First year, 10 million, second year, 11 million, 57 million, 87 million.

00:05:43.000 --> 00:05:48.680
 So then it all becomes an accumulation of what was the number that you said ultimately?

00:05:48.680 --> 00:05:49.680
 195.

00:05:49.680 --> 00:05:50.680
 195, I think.

00:05:50.680 --> 00:05:51.680
 195 million.

00:05:51.680 --> 00:05:52.680
 Yes, 195 million.

00:05:52.680 --> 00:05:53.680
 Yes.

00:05:53.680 --> 00:06:00.600
 Well, what is the payment timetable on something like that?

00:06:00.600 --> 00:06:03.520
 So the payment timetable, I think we're looking at 30 years.

00:06:03.520 --> 00:06:05.440
 That's what I'm going to show, a 30-year payout.

00:06:05.440 --> 00:06:08.440
 Yes, sir.

00:06:08.440 --> 00:06:14.000
 Thank you.

00:06:14.000 --> 00:06:20.440
 So is the Texas Water Development Board funding competitive or better than?

00:06:20.440 --> 00:06:21.440
 Yes.

00:06:21.440 --> 00:06:26.240
 So with the loan getting through the Texas Water Development Board, we're getting around

00:06:26.240 --> 00:06:28.040
 a 14% subsidy.

00:06:28.040 --> 00:06:33.040
 And also we get a slight discount on the interest rate just for that reason because it's all

00:06:33.040 --> 00:06:34.480
 going through the federal government.

00:06:34.480 --> 00:06:38.280
 So they're actually issuing the loans on our behalf and we get the loan through them.

00:06:38.280 --> 00:06:44.840
 So we get both like a rebate effectively and then also a lower interest rate?

00:06:44.840 --> 00:06:45.840
 Correct, yes.

00:06:45.840 --> 00:06:51.360
 And then these five years, it'll use market rate kind of each year as we go forward.

00:06:51.360 --> 00:06:52.360
 Yes.

00:06:52.360 --> 00:06:53.360
 Yep.

00:06:53.360 --> 00:06:55.240
 So that's why each year we'll kind of come back and say, hey, you know, here's the finance

00:06:55.240 --> 00:06:59.080
 agreement, sign the finance agreement, and then take a look at the terms.

00:06:59.080 --> 00:07:03.960
 And we work with our bond council and our hilltop advisors when we're looking at these

00:07:03.960 --> 00:07:05.960
 documents every year.

00:07:05.960 --> 00:07:10.320
 So the interest rates for, let's say, the first year, that would be a 30-year payout.

00:07:10.320 --> 00:07:11.840
 Is that a fixed rate?

00:07:11.840 --> 00:07:12.840
 Yes.

00:07:12.840 --> 00:07:17.080
 And then for the second year, the 11 million, that could be a different rate depending on

00:07:17.080 --> 00:07:18.080
 it.

00:07:18.080 --> 00:07:19.080
 Exactly.

00:07:19.080 --> 00:07:26.160
 So that's a flexible, in a sense it looks like, of an interest rate or a combined average

00:07:26.160 --> 00:07:28.760
 is what we're looking at, hoping that everything is low.

00:07:28.760 --> 00:07:30.560
 But all of those are fixed rates.

00:07:30.560 --> 00:07:31.560
 Correct, yes.

00:07:31.560 --> 00:07:32.560
 Okay, thank you.

00:07:32.560 --> 00:07:33.560
 Yes.

00:07:33.560 --> 00:07:36.720
 And just to keep in mind, each year when we go through the finance agreement, Texas Water

00:07:36.720 --> 00:07:39.280
 Development Board gives us that 14% subsidy.

00:07:39.280 --> 00:07:42.800
 So whatever market rate is, you'll get 40% less because you're going through the federal

00:07:42.800 --> 00:07:43.800
 government.

00:07:43.800 --> 00:07:44.800
 Definitely, yeah.

00:07:44.800 --> 00:07:45.800
 But you're correct.

00:07:45.800 --> 00:07:50.400
 And then on the penalty page.

00:07:50.400 --> 00:07:52.220
 Yes.

00:07:52.220 --> 00:08:00.060
 So if these were paid off early, like 20 years, we refund for a better interest rate or something

00:08:00.060 --> 00:08:06.480
 like that, this seems kind of pretty onerous for an early payment.

00:08:06.480 --> 00:08:07.800
 Is that correct?

00:08:07.800 --> 00:08:14.160
 Or is the termination different than an early payback?

00:08:14.160 --> 00:08:19.720
 Steven Gay, Director of Water Utilities.

00:08:19.720 --> 00:08:20.720
 It's different.

00:08:20.720 --> 00:08:25.840
 That's only if we, these penalties are if we choose to not accept the monies.

00:08:25.840 --> 00:08:30.920
 So it's anticipation of them issuing the debt, and so the further along they get down the

00:08:30.920 --> 00:08:34.720
 path of issuing the debt, the more egregious those penalties are.

00:08:34.720 --> 00:08:38.520
 So that's why we're coming to you now, getting the approval, we're going to get the finance

00:08:38.520 --> 00:08:41.320
 agreement, we'll review it, and in plenty of time.

00:08:41.320 --> 00:08:44.400
 So if we want to back out, we're going to mitigate our liability.

00:08:44.400 --> 00:08:45.400
 Does that make sense?

00:08:45.400 --> 00:08:47.080
 And did that answer your question?

00:08:47.080 --> 00:08:48.080
 Yeah.

00:08:48.080 --> 00:08:53.600
 So that this doesn't affect like early refund the bonds in 2040 or something like that.

00:08:53.600 --> 00:08:56.000
 And then one, actually, one last question regarding water supply.

00:08:56.000 --> 00:09:04.040
 Is this increase to 70 MGD, about what year does that put our next capacity expansion

00:09:04.040 --> 00:09:05.040
 at?

00:09:05.040 --> 00:09:06.040
 Oh, that's a good question.

00:09:06.040 --> 00:09:10.920
 I might have to get back with you on that because I'm trying to think, I want to say

00:09:10.920 --> 00:09:15.760
 just 2050 is the number that comes to mind, but I have to verify that.

00:09:15.760 --> 00:09:21.360
 So this is like an expansion capacity for about the next 10 to 15 years.

00:09:21.360 --> 00:09:22.360
 Easily.

00:09:22.360 --> 00:09:24.080
 And that's why we're building it the way we're doing right now.

00:09:24.080 --> 00:09:25.880
 So we know we're going to need the additional capacity.

00:09:25.880 --> 00:09:30.160
 So we're building the building for up to 50 million gallons a day, but we're only putting

00:09:30.160 --> 00:09:33.800
 in 20 today because that's what our immediate demand is.

00:09:33.800 --> 00:09:38.340
 And then we can kind of mark, we can monitor the market and the growth patterns and things

00:09:38.340 --> 00:09:42.640
 like that, and then we'll be set up more easily to add the capacity.

00:09:42.640 --> 00:09:46.560
 So it's more or less adding equipment and not concrete and infrastructure and wiring

00:09:46.560 --> 00:09:47.560
 and things like that.

00:09:47.560 --> 00:09:48.560
 Thank you.

00:09:48.560 --> 00:09:49.560
 Yes, sir.

00:09:49.560 --> 00:09:50.560
 I'm so excited.

00:09:50.560 --> 00:09:51.560
 Thank you.

00:09:51.560 --> 00:09:52.560
 Thank you, sir.

00:09:52.560 --> 00:09:53.560
 Oh, yeah.

00:09:53.560 --> 00:09:54.560
 Okay.

00:09:54.560 --> 00:09:55.560
 Anybody else?

00:09:55.560 --> 00:10:11.520
 Oh, so we can do an early payoff and there's no penalty.

00:10:11.520 --> 00:10:20.080
 And is it the history of this city that we do strive to make those early payoffs?

00:10:20.080 --> 00:10:25.240
 I would defer to our finance team for that, but I would say yes.

00:10:25.240 --> 00:10:29.000
 That just depends, like I said, you know, we have to work with our hilltop advisor just

00:10:29.000 --> 00:10:33.080
 to get understanding if that's beneficial, you know, from a finance perspective.

00:10:33.080 --> 00:10:34.080
 So...

00:10:34.080 --> 00:10:40.120
 Well, I would think from a real estate thing, if I could pay off a note sooner, I'm better

00:10:40.120 --> 00:10:44.160
 off eventually, because I know the city's already set and the pipeline's going, but

00:10:44.160 --> 00:10:49.200
 if we could pay it off early, I can't imagine a scenario where that would not be appropriate.

00:10:49.200 --> 00:10:50.560
 But just my own opinion.

00:10:50.560 --> 00:10:51.560
 Thank you so much.

00:10:51.560 --> 00:10:55.320
 Okay.

00:10:55.320 --> 00:10:57.320
 My question is this.

00:10:57.320 --> 00:11:08.320
 So the payback of this is based upon utility rates, impact fees, I would imagine, right?

00:11:08.320 --> 00:11:14.440
 Is there any MUD district contribution rather than usage?

00:11:14.440 --> 00:11:20.820
 In the development agreements that we are negotiating with the MUDs, we have provisions

00:11:20.820 --> 00:11:25.440
 in there that they will pay impact fees for their impact to our system, and that's going

00:11:25.440 --> 00:11:31.280
 to be consistent with what the development community within our corporate limits would

00:11:31.280 --> 00:11:38.520
 be paying, and furthermore, services outside of our corporate limits are charged at a premium,

00:11:38.520 --> 00:11:42.680
 so we have an additional, I guess, a rider on top of that, because it's outside of the

00:11:42.680 --> 00:11:43.680
 corporate limits.

00:11:43.680 --> 00:11:45.360
 Does that answer your question?

00:11:45.360 --> 00:11:51.400
 Yes, and it just brought up more questions in my head about MUD districts, which may

00:11:51.400 --> 00:11:59.240
 not be on the subject too much, but I'm curious for the residents that would be outside of

00:11:59.240 --> 00:12:07.400
 our district or our area that have already paid their MUD district and already built

00:12:07.400 --> 00:12:16.440
 their homes, and they're able to get onto our system, that's just going to be usage

00:12:16.440 --> 00:12:20.880
 income, correct?

00:12:20.880 --> 00:12:21.880
 Can you restate the question?

00:12:21.880 --> 00:12:22.880
 I want to make sure I understand.

00:12:22.880 --> 00:12:30.480
 I buy a house in a MUD district who does not have an agreement with Denton currently.

00:12:30.480 --> 00:12:37.320
 I pay my MUD district impact fee, or whatever they call that, when you buy your house, and

00:12:37.320 --> 00:12:43.920
 I've already built my home, so therefore, I've paid all impact fees that were necessary.

00:12:43.920 --> 00:12:47.800
 Of course, MUD's going to hit them every year for a while.

00:12:47.800 --> 00:12:51.560
 Do you pick up those MUD districts that have been sitting there that weren't currently?

00:12:51.560 --> 00:12:54.000
 No, we're negotiating with all of them.

00:12:54.000 --> 00:12:57.880
 If you did, it'd be a whole different ordeal, right?

00:12:57.880 --> 00:13:00.600
 We'd have a different agreement, a structure with them.

00:13:00.600 --> 00:13:03.480
 What MUD districts do you currently have agreements with?

00:13:03.480 --> 00:13:07.600
 We don't have an agreement, well, Legends, but it's not a MUD.

00:13:07.600 --> 00:13:08.600
 Where's Legends?

00:13:08.600 --> 00:13:17.920
 Legends is kind of up on the west of the 35 above University, 380, it's one of the newer

00:13:17.920 --> 00:13:20.280
 districts out there.

00:13:20.280 --> 00:13:27.280
 We don't have a wastewater agreement with any of the MUDs currently.

00:13:27.280 --> 00:13:33.040
 We're under negotiations and discussions with them, but nothing has been inked.

00:13:33.040 --> 00:13:36.880
 I hope I didn't get off discussion, but it was mentioned in this, and I didn't think

00:13:36.880 --> 00:13:38.600
 about MUDs being part of this.

00:13:38.600 --> 00:13:45.840
 When we look at our growth, we want to look at our entire ETJ, Extraterritorial Jurisdiction,

00:13:45.840 --> 00:13:48.440
 to ensure that we're prepared for anything.

00:13:48.440 --> 00:13:55.400
 When we do our impact fee analysis, we're allowed to, through I think it's 395 of the

00:13:55.400 --> 00:14:03.480
 TAC, we're allowed to look at our Extraterritorial Jurisdiction, and I guess identify an impact

00:14:03.480 --> 00:14:07.080
 fee in those areas, and that's what we're doing currently.

00:14:07.080 --> 00:14:09.320
 We're doing that analysis right now.

00:14:09.320 --> 00:14:15.600
 Quite a few moons ago, maybe 15 to 20 years ago, we did have the situation come up where

00:14:15.600 --> 00:14:24.560
 we did stop expansion of our Pecan Creek, because we had predicted of that entire subdivision.

00:14:24.560 --> 00:14:27.840
 Well, Pecan Creek is actually almost at capacity.

00:14:27.840 --> 00:14:32.760
 We can only discharge about 30 million gallons a day at that site, and with the current project,

00:14:32.760 --> 00:14:35.880
 we're going to get right up to 30 million gallons a day.

00:14:35.880 --> 00:14:39.660
 On the wastewater side of the equation, that's why we're looking at those, basically looking

00:14:39.660 --> 00:14:44.280
 at by basins, the Hickory Creek Basin, the Pecan Creek Basin, and the Clear Creek Basin,

00:14:44.280 --> 00:14:47.200
 and having a plant in each one of those.

00:14:47.200 --> 00:14:48.200
 Okay.

00:14:48.200 --> 00:14:49.200
 All right.

00:14:49.200 --> 00:14:50.200
 Yes, sir?

00:14:50.200 --> 00:14:54.520
 Payments, monthly, quarterly, annually.

00:14:54.520 --> 00:14:58.200
 Payments are semi-annually, so basically twice a year.

00:14:58.200 --> 00:14:59.200
 Great.

00:14:59.200 --> 00:15:00.200
 Thank you.

00:15:00.200 --> 00:15:01.200
 All right.

00:15:01.200 --> 00:15:02.200
 Anything further?

00:15:02.200 --> 00:15:05.720
 Do we need action on this item?

00:15:05.720 --> 00:15:06.720
 Yes.

00:15:06.720 --> 00:15:07.720
 All right.

00:15:07.720 --> 00:15:18.960
 Well, if there is not any further discussion, we'll entertain a motion.

00:15:18.960 --> 00:15:19.960
 Second.

00:15:19.960 --> 00:15:24.800
 We have a motion, and a second, did you get those?

00:15:24.800 --> 00:15:25.800
 Okay.

00:15:25.800 --> 00:15:26.800
 Any further discussion?

00:15:26.800 --> 00:15:29.760
 If not, all those in favor, please say aye.

00:15:29.760 --> 00:15:30.760
 Aye.

00:15:30.760 --> 00:15:32.520
 Opposed, sign the same.

00:15:32.520 --> 00:15:33.520
 None.

00:15:33.520 --> 00:15:34.520
 Pass unanimously.

00:15:34.520 --> 00:15:39.480
 Item C, consider recommending adoption of the ordinance for the City of Denton at Texas

00:15:39.480 --> 00:15:43.520
 Home Rule Corporation, authorizing the city manager to execute amendment number three

00:15:43.520 --> 00:15:49.840
 to the power purchase agreement between the city and Core Scientific.

00:15:49.840 --> 00:15:55.640
 Could you read item D in as well, please?

00:15:55.640 --> 00:16:01.600
 This is item D, PUB 24-128, consider recommending adoption of an ordinance of the City of Denton

00:16:01.600 --> 00:16:05.680
 at Texas Home Rule Corporation, authorizing the city manager to execute amendment number

00:16:05.680 --> 00:16:10.320
 two to the lease agreement between the city and Core Scientific, a Delaware corporation

00:16:10.320 --> 00:16:12.400
 providing for an effective date.

00:16:12.400 --> 00:16:13.840
 Thank you.

00:16:13.840 --> 00:16:14.840
 Happy now?

00:16:14.840 --> 00:16:15.840
 Yes, sir.

00:16:15.840 --> 00:16:16.840
 Thank you.

00:16:16.840 --> 00:16:19.840
 Thank you to the assistant general manager at DME.

00:16:19.840 --> 00:16:25.600
 So today we're here to talk about an amendment to the power purchase agreement with Core

00:16:25.600 --> 00:16:31.440
 Scientific and a lease amendment as well with the same entity.

00:16:31.440 --> 00:16:36.040
 I'll give you a quick update on the project status.

00:16:36.040 --> 00:16:41.600
 As you can see from the aerial, this is the Core Scientific project at the Denton Energy

00:16:41.600 --> 00:16:42.600
 Center.

00:16:42.600 --> 00:16:45.560
 The Denton Energy Center is here in the center.

00:16:45.560 --> 00:16:48.320
 Our substation is here.

00:16:48.320 --> 00:16:52.280
 Phase one, phase two, and phase three.

00:16:52.280 --> 00:16:54.640
 So phase two, phase one complete.

00:16:54.640 --> 00:16:56.680
 Phase two, about 80 percent.

00:16:56.680 --> 00:17:06.520
 And phase three was the phase that was impacted by the bankruptcy in 2021.

00:17:06.520 --> 00:17:11.920
 They've successfully come out of bankruptcy and are now looking to finish out the construction

00:17:11.920 --> 00:17:15.160
 on phase three.

00:17:15.160 --> 00:17:21.640
 Phase three is intended now to be converted from cryptocurrency mining to a traditional

00:17:21.640 --> 00:17:30.320
 -- sorry, traditional tier three data center, which is a constant load.

00:17:30.320 --> 00:17:38.200
 Unlike the cryptocurrency operation, this load would not be subject to price sensitivity.

00:17:38.200 --> 00:17:40.840
 So they will run around the clock.

00:17:40.840 --> 00:17:52.480
 The purpose of this entity is to begin doing artificial intelligence computations.

00:17:52.480 --> 00:17:59.160
 So not only are we suggesting to -- or requesting a change to the power purchase agreement because

00:17:59.160 --> 00:18:06.040
 of that different load profile, we have to provide for our protection and for there's

00:18:06.040 --> 00:18:11.960
 a fixed price rate for this part of the operation.

00:18:11.960 --> 00:18:17.240
 But we're also including an expansion of the leased area.

00:18:17.240 --> 00:18:26.120
 And the expansion of the leased area is shown over here, these black rectangles.

00:18:26.120 --> 00:18:30.780
 Those are standby generators.

00:18:30.780 --> 00:18:37.120
 Those will be either diesel or gas fire generators to back up critical operations at the high

00:18:37.120 --> 00:18:40.520
 performance computing phase three.

00:18:40.520 --> 00:18:47.440
 The mauve colored rectangles here are heat exchangers.

00:18:47.440 --> 00:18:53.160
 Currently the cryptocurrency operation runs using air cooled.

00:18:53.160 --> 00:18:58.720
 So it takes ambient air and passes it through the processors and then exhausts the hotter

00:18:58.720 --> 00:19:01.380
 air out through the top of the building.

00:19:01.380 --> 00:19:07.080
 As a tier three data center, this will be an environment controlled building.

00:19:07.080 --> 00:19:19.940
 So there will be space heating and cooling in these buildings once they're converted.

00:19:19.940 --> 00:19:26.200
 So as a jurisdictional monopoly, DME is required to serve these loads.

00:19:26.200 --> 00:19:33.400
 We're the only provider and as long as we can meet the demands without upgrading our

00:19:33.400 --> 00:19:38.200
 transmission or distribution system, we have to serve the load.

00:19:38.200 --> 00:19:45.400
 So what we're asking today is to modify the power purchase agreement to convert this high

00:19:45.400 --> 00:19:49.120
 performance computing section to a firm tariff price.

00:19:49.120 --> 00:19:56.960
 It will only be subject to ERCOT mandated load shed events or DME outages due to distribution

00:19:56.960 --> 00:20:00.920
 or transmission system issues.

00:20:00.920 --> 00:20:05.420
 The tariff price that we are proposing is one that is a cost of service base to recover

00:20:05.420 --> 00:20:08.880
 all of our costs to serve this customer.

00:20:08.880 --> 00:20:13.000
 And it will be a renewable energy supply.

00:20:13.000 --> 00:20:20.200
 For the immediate term, we will be doing forward hedges in the market, buying the power we

00:20:20.200 --> 00:20:22.760
 need to serve this entity.

00:20:22.760 --> 00:20:27.520
 Longer term, we'll be discussing that with you at a later date as part of the debt and

00:20:27.520 --> 00:20:35.520
 renewable resource plan chapter two.

00:20:35.520 --> 00:20:42.680
 One thing that I think is important to understand that this is our forecasted peak demand.

00:20:42.680 --> 00:20:50.340
 The orange line at the bottom is our forecasted peak demand for the system without the core

00:20:50.340 --> 00:20:53.840
 phase three HPC operation.

00:20:53.840 --> 00:21:00.320
 The blue line is with the HPC operation and then the purple line is kind of the upper

00:21:00.320 --> 00:21:05.800
 bounds of where we could potentially be at as a system if we continue to see the high

00:21:05.800 --> 00:21:14.440
 growth rates that we've been seeing over the last two to three years.

00:21:14.440 --> 00:21:19.640
 So as I'm looking at this, is it fair to say that your 56% would that be the blue line

00:21:19.640 --> 00:21:24.000
 and the 84 being the purple or do they have any correlation to those colors at all?

00:21:24.000 --> 00:21:25.000
 That is correct.

00:21:25.000 --> 00:21:28.000
 Oh, wonderful.

00:21:28.000 --> 00:21:33.200
 So at the bottom you see the gray bars, that's the debt and energy center, the 225 megawatts

00:21:33.200 --> 00:21:36.320
 of firm capacity that we have.

00:21:36.320 --> 00:21:43.680
 The rest of our energy is filled from renewable energy power purchase agreements and or bilateral

00:21:43.680 --> 00:21:50.320
 agreements with counterparties in the market.

00:21:50.320 --> 00:21:59.640
 So the changes, we've established a new demand based rate for the HPC operations in phase

00:21:59.640 --> 00:22:00.640
 three.

00:22:00.640 --> 00:22:07.440
 We've added an early termination fee to protect our customers if for some reason the core

00:22:07.440 --> 00:22:10.240
 HPC load were to go away.

00:22:10.240 --> 00:22:16.340
 We are adding some telemetry requirements to know the status of the backup generation

00:22:16.340 --> 00:22:22.040
 and we're amending the load shed language to be consistent with their protocols.

00:22:22.040 --> 00:22:28.440
 For the lease, we're amending the lease to add an additional 5.5 acres which is required

00:22:28.440 --> 00:22:34.360
 for those backup generators and heat exchangers.

00:22:34.360 --> 00:22:37.640
 And with that I'll be glad to answer any questions you might have.

00:22:37.640 --> 00:22:42.240
 Mr. Rayner?

00:22:42.240 --> 00:22:45.560
 The last slide you had on the 5.5, is that a ground lease?

00:22:45.560 --> 00:22:46.560
 It is.

00:22:46.560 --> 00:22:48.480
 It is a ground lease.

00:22:48.480 --> 00:22:52.640
 So we already have a ground lease out there for 31.5 acres.

00:22:52.640 --> 00:22:54.640
 We're just adding another 5.5 to that.

00:22:54.640 --> 00:22:56.600
 And what is the term on that?

00:22:56.600 --> 00:23:01.080
 That's 14 years with a 14-year option to extend.

00:23:01.080 --> 00:23:06.120
 And it's coincident with the existing lease.

00:23:06.120 --> 00:23:08.880
 And then my other question is on the early termination.

00:23:08.880 --> 00:23:15.960
 So I understand Core, Core Scientific, did they go into bankruptcy or were they involved

00:23:15.960 --> 00:23:16.960
 with that?

00:23:16.960 --> 00:23:17.960
 They were.

00:23:17.960 --> 00:23:22.080
 In late 2021 they declared Chapter 11 bankruptcy.

00:23:22.080 --> 00:23:26.400
 They have emerged as quite a strong entity now.

00:23:26.400 --> 00:23:31.840
 And I'll just point out that even through the bankruptcy, the city was able to collect

00:23:31.840 --> 00:23:32.840
 all amounts due.

00:23:32.840 --> 00:23:35.800
 There was no loss as a result of that.

00:23:35.800 --> 00:23:40.280
 And that's what I was curious, because of already having that strike, rightfully so

00:23:40.280 --> 00:23:45.640
 or not, as the early termination fee, was it, would it be fair to say it was beefed

00:23:45.640 --> 00:23:48.160
 up a little bit because of that situation?

00:23:48.160 --> 00:23:49.160
 It was.

00:23:49.160 --> 00:23:51.940
 So it's specific to the Phase 3 operation.

00:23:51.940 --> 00:23:52.940
 Only?

00:23:52.940 --> 00:23:54.600
 Only to the Phase 3 operation.

00:23:54.600 --> 00:23:55.600
 We beefed that up.

00:23:55.600 --> 00:24:00.480
 That's where we have the most price risk, since it is a more of a fixed-price offer

00:24:00.480 --> 00:24:02.600
 like our normal load that we-- I got you.

00:24:02.600 --> 00:24:03.600
 Thank you.

00:24:03.600 --> 00:24:04.600
 Question?

00:24:04.600 --> 00:24:05.600
 Mr. Taylor?

00:24:05.600 --> 00:24:06.600
 Good morning.

00:24:06.600 --> 00:24:07.600
 Morning.

00:24:07.600 --> 00:24:17.280
 You know, I see all those generators, and I think that that might be a really good opportunity

00:24:17.280 --> 00:24:22.000
 for demand response or behind-the-meter load reduction.

00:24:22.000 --> 00:24:27.880
 And I just want to make sure that we're offering our large customers terms that would allow

00:24:27.880 --> 00:24:33.560
 them to do that and maybe split the revenue or split the savings in cases that prices

00:24:33.560 --> 00:24:34.560
 do get really high.

00:24:34.560 --> 00:24:41.260
 You know, we could-- DME could allow them to reduce their load, and we could sell back

00:24:41.260 --> 00:24:48.120
 some of our forward purchases while the customer could avoid, you know, or get paid basically

00:24:48.120 --> 00:24:49.720
 to run their own equipment.

00:24:49.720 --> 00:24:51.240
 That's a great idea.

00:24:51.240 --> 00:24:53.600
 And yeah, we are pursuing that.

00:24:53.600 --> 00:24:59.440
 Obviously, what CORE wants to do is get this lease and the PPA amendment in place.

00:24:59.440 --> 00:25:07.280
 They have a contract with a large, high-tech business to try to get this thing up and running.

00:25:07.280 --> 00:25:12.680
 Those types of arrangements on the demand side-- obviously, there are demand-side programs

00:25:12.680 --> 00:25:13.960
 in ERCOT.

00:25:13.960 --> 00:25:19.200
 Unfortunately, right now, there's very little incentive for people to participate, because

00:25:19.200 --> 00:25:25.120
 unless the utility-- in the-- I should put it this way-- in the competitive markets,

00:25:25.120 --> 00:25:27.400
 there is more of an incentive.

00:25:27.400 --> 00:25:32.700
 In the MOU markets, like Denton, where everything is vertically integrated, there really is

00:25:32.700 --> 00:25:34.480
 very little incentive.

00:25:34.480 --> 00:25:39.920
 However, for these types of facilities that have this backup generation, we will be exploring

00:25:39.920 --> 00:25:42.040
 those types of options.

00:25:42.040 --> 00:25:46.840
 We just don't have any big customers right now on the system that would be able to participate

00:25:46.840 --> 00:25:47.840
 in a meaningful way.

00:25:47.840 --> 00:25:52.160
 Thank you.

00:25:52.160 --> 00:26:01.740
 So that was along the same lines as the question I was going to ask was-- are they-- this may

00:26:01.740 --> 00:26:03.120
 be a closed session item.

00:26:03.120 --> 00:26:06.720
 I'll just not ask it, because that really answered my question.

00:26:06.720 --> 00:26:07.720
 Thanks, Terry.

00:26:07.720 --> 00:26:08.720
 You're welcome.

00:26:08.720 --> 00:26:09.720
 I just said it.

00:26:09.720 --> 00:26:10.720
 I'm thinking through it.

00:26:10.720 --> 00:26:11.720
 All right.

00:26:11.720 --> 00:26:12.720
 Any other questions?

00:26:12.720 --> 00:26:23.680
 It doesn't look like we're going into closed session, so can we-- you want to do them separately?

00:26:23.680 --> 00:26:24.680
 Yes.

00:26:24.680 --> 00:26:25.680
 OK.

00:26:25.680 --> 00:26:32.600
 With the presentation last meeting and this meeting, I think I've satisfied all my questions

00:26:32.600 --> 00:26:36.040
 regarding the revised PPA.

00:26:36.040 --> 00:26:41.240
 So I move approval of item C, the revised PPA for phase three.

00:26:41.240 --> 00:26:42.240
 OK.

00:26:42.240 --> 00:26:44.120
 I have a motion.

00:26:44.120 --> 00:26:45.320
 Any second?

00:26:45.320 --> 00:26:46.320
 Second.

00:26:46.320 --> 00:26:49.120
 I have a second for Mr. Rayner.

00:26:49.120 --> 00:26:51.360
 Any further discussion?

00:26:51.360 --> 00:26:54.040
 There being none.

00:26:54.040 --> 00:26:56.960
 All those in favor of item C, please say aye.

00:26:56.960 --> 00:26:57.960
 Aye.

00:26:57.960 --> 00:26:58.960
 Any opposed?

00:26:58.960 --> 00:26:59.960
 Sign the same.

00:26:59.960 --> 00:27:00.960
 There are none.

00:27:00.960 --> 00:27:01.960
 All right.

00:27:01.960 --> 00:27:04.120
 Is there a motion for item D?

00:27:04.120 --> 00:27:08.080
 I think there are package deals, so I'll move for approval of item D.

00:27:08.080 --> 00:27:09.080
 I have a motion.

00:27:09.080 --> 00:27:10.080
 Second.

00:27:10.080 --> 00:27:13.880
 I have a second for Mr. Newquist.

00:27:13.880 --> 00:27:15.760
 All those in favor, please say aye.

00:27:15.760 --> 00:27:16.760
 Aye.

00:27:16.760 --> 00:27:17.760
 Any opposed?

00:27:17.760 --> 00:27:18.760
 Sign the same.

00:27:18.760 --> 00:27:21.200
 There being none, we'll move on to item E, management reports.

00:27:21.200 --> 00:27:22.200
 Mr. Puentes.

00:27:22.200 --> 00:27:28.160
 Mr. Chair, members of the board, just to your future agenda items, we don't have anything

00:27:28.160 --> 00:27:29.160
 listed on there.

00:27:29.160 --> 00:27:32.820
 That means that we won't have items on the agenda, but certainly not any items at this

00:27:32.820 --> 00:27:36.160
 point that we want to specifically highlight for you.

00:27:36.160 --> 00:27:39.760
 And then on the new business action matrix, we still have the one item for fleet.

00:27:39.760 --> 00:27:44.560
 I have been in communication with the fleet manager, and he is working on that and anticipates

00:27:44.560 --> 00:27:47.320
 having that to you before that October date.

00:27:47.320 --> 00:27:51.400
 So with that, if you have any other questions or any other requests, I'm really happy to

00:27:51.400 --> 00:27:53.800
 talk through with you.

00:27:53.800 --> 00:27:54.800
 Anyone?

00:27:54.800 --> 00:27:55.800
 Bueller?

00:27:55.800 --> 00:27:56.800
 No?

00:27:56.800 --> 00:27:57.800
 All right.

00:27:57.800 --> 00:28:02.240
 Looks like we've made it through.

00:28:02.240 --> 00:28:07.640
 If there is no further discussion, I'll entertain a motion to adjourn.

00:28:07.640 --> 00:28:08.640
 I'll move.

00:28:08.640 --> 00:28:09.640
 All right.

00:28:09.640 --> 00:28:14.800
 I don't think we all have to be in favor, so we'll be adjourned.

00:28:14.800 --> 00:28:15.000
 Thank you.