00:00:00.000 --> 00:00:06.480
 Good morning.

00:00:06.480 --> 00:00:10.960
 We have a quorum and so I'm going to call this early morning edition of the mobility

00:00:10.960 --> 00:00:14.280
 committee to order.

00:00:14.280 --> 00:00:18.920
 Our first item, item A, is consider the approval of the minutes for the meeting held July 9,

00:00:18.920 --> 00:00:19.920
 2019.

00:00:19.920 --> 00:00:20.920
 I'll entertain a motion.

00:00:20.920 --> 00:00:25.240
 I have no choice but to second.

00:00:25.240 --> 00:00:26.240
 All in favor?

00:00:26.240 --> 00:00:27.240
 Aye.

00:00:27.240 --> 00:00:31.180
 Let's move on to item B, receive a report and hold a discussion regarding Texas Department

00:00:31.180 --> 00:01:01.140
 transportation on system projects in the Denton area.

00:01:01.140 --> 00:01:02.140
 Thank you.

00:01:02.140 --> 00:01:07.780
 My name is John Polster with Innovative Transportation Solutions, Incorporated and we'll get started

00:01:07.780 --> 00:01:11.260
 on the project list of on-system projects.

00:01:11.260 --> 00:01:15.980
 We have some very good news towards the end or the middle, I guess, we can share with

00:01:15.980 --> 00:01:17.740
 you today.

00:01:17.740 --> 00:01:21.340
 The total cost of the projects that we're looking at has been updated.

00:01:21.340 --> 00:01:27.380
 We're now at just under two and a half billion dollars worth of projects that are on our

00:01:27.380 --> 00:01:31.420
 action item list.

00:01:31.420 --> 00:01:37.020
 So that's up about 300 million from the last time you saw this project.

00:01:37.020 --> 00:01:45.620
 2181, while there is no official information on the start date, we do have additional information

00:01:45.620 --> 00:01:54.540
 related to some conversations that Assurity is having with Zachary and so we're looking

00:01:54.540 --> 00:02:01.500
 at maybe knowing something about a start date sometime in the late September, early October

00:02:01.500 --> 00:02:03.700
 time frame.

00:02:03.700 --> 00:02:10.180
 And unfortunately, probably what that means is that TechStat will give back to the Assurity

00:02:10.180 --> 00:02:15.100
 all of the days in the contract, which will extend the time it takes to get the project

00:02:15.100 --> 00:02:21.820
 completed but it will get the project started.

00:02:21.820 --> 00:02:26.420
 So good news, bad news, your Fort Worth drive continues to be under construction.

00:02:26.420 --> 00:02:33.020
 We have the report from TechStat, SEMA has addressed some of the utility issues and they're

00:02:33.020 --> 00:02:42.180
 now doing the pavement for the concrete pavement and they're starting from the frontage roads

00:02:42.180 --> 00:02:43.180
 working south.

00:02:43.180 --> 00:02:48.940
 So it will probably be another month or so before we have that intersection with the

00:02:48.940 --> 00:02:54.220
 turn lane so the traffic can get out onto the frontage road a little quicker but that

00:02:54.220 --> 00:03:00.860
 project is moving well and we had a fairly spirited mobility meeting the other day on

00:03:00.860 --> 00:03:03.660
 System Task Force.

00:03:03.660 --> 00:03:07.180
 Councilman Ryan, for whatever reason, started showing up so I've been getting a lot more

00:03:07.180 --> 00:03:09.260
 better response out of your staff.

00:03:09.260 --> 00:03:12.500
 I've been waiting all week to do that.

00:03:12.500 --> 00:03:16.100
 Well, nice you showed up at least at that.

00:03:16.100 --> 00:03:23.620
 Alright, your 35E Mayhill project, we had a good meeting with your development crew.

00:03:23.620 --> 00:03:31.620
 There is a question about the James Wood right away impacts associated with the remainder

00:03:31.620 --> 00:03:40.540
 and your development department met with us last week and was very helpful in giving us

00:03:40.540 --> 00:03:45.060
 an opportunity to at least try to get out of about a million and a half dollar impact

00:03:45.060 --> 00:03:50.940
 that we'll have to pay on the James Wood site and it's pretty much consistent with your

00:03:50.940 --> 00:03:55.540
 development review policies anyway so it looks like it's a win-win for everybody.

00:03:55.540 --> 00:03:59.100
 So we continue to move forward on the right away acquisition on this project and it has

00:03:59.100 --> 00:04:09.540
 a November 2020 let date and we are still on track to meet that date.

00:04:09.540 --> 00:04:13.500
 Your Luke 28 Brinker project, I don't know if you've driven by there, they are now currently

00:04:13.500 --> 00:04:23.980
 putting the asphalt down for the southbound main lanes at the 288 section, it's still

00:04:23.980 --> 00:04:31.060
 shooting for a September time frame for the southbound Luke 288 exit to be permanent exit

00:04:31.060 --> 00:04:39.020
 to be in place and then the Brinker underpass being open to traffic.

00:04:39.020 --> 00:04:41.900
 It really depends on right now OHL.

00:04:41.900 --> 00:04:49.140
 You may have already been in the process of answering but you said OHL and so for me I

00:04:49.140 --> 00:04:57.700
 know that Brinker, Loop and Teasley and then the on ramp on Dallas Drive, those are all

00:04:57.700 --> 00:05:05.100
 connected correct and so I as well as a lot of other council members and then things we've

00:05:05.100 --> 00:05:10.780
 passing off the staff have been getting several several comments and complaints and requests

00:05:10.780 --> 00:05:17.300
 for Teasley and 288 and so why this slide is up here if you could talk about how these

00:05:17.300 --> 00:05:20.980
 are all connected and at which point are they all going to open at the same time or will

00:05:20.980 --> 00:05:25.300
 one open and then in a month later another will open because I know that they all depend

00:05:25.300 --> 00:05:27.860
 upon each other some form or fashion.

00:05:27.860 --> 00:05:32.540
 So the answer on Dallas Drive is Dallas Drive is one of the last things that opens because

00:05:32.540 --> 00:05:39.860
 it opens when the 288 interchange is completed which is the last thing to be done but in

00:05:39.860 --> 00:05:47.020
 the next 45 days you're going to have the on ramp back in place for the mall so as you're

00:05:47.020 --> 00:05:52.620
 going north you can get on without having to go up to Teasley.

00:05:52.620 --> 00:05:57.940
 That will also fix the exit for the Dallas Drive from one two lanes to one.

00:05:57.940 --> 00:06:05.620
 That same 45 day period the week we could open Brinker today from a geometric standpoint

00:06:05.620 --> 00:06:10.460
 except there would have to be a stock condition on the frontage roads and the temporary off

00:06:10.460 --> 00:06:15.900
 ramp comes and exits right at that location so it's a dangerous situation.

00:06:15.900 --> 00:06:25.300
 So once we get the same 45 day period the new southbound exit for loop 288 or just past

00:06:25.300 --> 00:06:31.500
 loop 288 for Brinker and Mayhill let's exit the Mayhill exit move back north and so the

00:06:31.500 --> 00:06:36.580
 temporary goes away then the only thing left is the signal which is where I was fixing

00:06:36.580 --> 00:06:38.620
 to go.

00:06:38.620 --> 00:06:43.220
 We're ready to go on that the City of Dent's done everything they're supposed to do but

00:06:43.220 --> 00:06:51.300
 OHL isn't shockingly isn't playing ball with us on it so they're the variable on that signal

00:06:51.300 --> 00:06:57.980
 so I think your staff is thinking that if it gets to push to shove don't let me misquote

00:06:57.980 --> 00:07:03.020
 you all that there may be a way for you all to come in and help with the signal installation

00:07:03.020 --> 00:07:07.420
 and I'll let somebody else amplify that.

00:07:07.420 --> 00:07:12.500
 So obviously that's part of the contract for the OHL contractor but in interest to expedite

00:07:12.500 --> 00:07:17.380
 the intersection if we needed to that we have thrown the position out that we might be willing

00:07:17.380 --> 00:07:22.620
 in to go in and install these signals if need be we're still working through that issue

00:07:22.620 --> 00:07:26.540
 that's absolutely something we're exploring and the impact of that from an in-house standpoint

00:07:26.540 --> 00:07:31.180
 what would that mean in a way materials methods and getting the crews out there to actually

00:07:31.180 --> 00:07:32.180
 do that work.

00:07:32.180 --> 00:07:38.180
 So in that same 45-day period what you'd also have is while they're still working underneath

00:07:38.180 --> 00:07:45.140
 loop 288 for the main lanes you'd have both of your u-turns functional so a lot of traffic

00:07:45.140 --> 00:07:50.780
 that's trying to get to say Brinker and the Bucky side they can't cross here they go up

00:07:50.780 --> 00:07:57.660
 sets through the light and turn and come through once we get those in the next 45 days to u-turns

00:07:57.660 --> 00:08:01.660
 they'll be able to come up make the u-turn and come back south and not actually set through

00:08:01.660 --> 00:08:11.300
 the light so you should start to see slight improvements over the horrible condition that's

00:08:11.300 --> 00:08:16.300
 out there in the next 45 days but the opening of Dallas Drive is probably the very last

00:08:16.300 --> 00:08:19.940
 thing southbound that you'll see on this project.

00:08:19.940 --> 00:08:26.460
 So just a recap and for clarification and you step in so within 45 days we will see

00:08:26.460 --> 00:08:34.860
 at least one of these intersections improve or open and then possibly both of them.

00:08:34.860 --> 00:08:42.500
 The asterisk is we're dealing with OHL but that's their schedule and they appear to be

00:08:42.500 --> 00:08:45.860
 doing the things that they said they were going to do in order to make those things

00:08:45.860 --> 00:08:52.860
 happen but I never want to be in the position to defend an OHL for anything but yes that's

00:08:52.860 --> 00:08:57.260
 what and Councilman Ryan was at the meeting we had a fairly spirited conversation about

00:08:57.260 --> 00:09:02.140
 this whole issue.

00:09:02.140 --> 00:09:07.420
 Your staff is very proactive trying to get things done in this area.

00:09:07.420 --> 00:09:11.180
 I appreciate that they're very responsive when we get complaints and there's just a

00:09:11.180 --> 00:09:15.980
 lot of frustration built up from the community right now from this area.

00:09:15.980 --> 00:09:21.300
 Well that's the good news is right as we get this done we'll start doing the same thing

00:09:21.300 --> 00:09:22.300
 to mail.

00:09:22.300 --> 00:09:28.740
 I've got some more news for you too that's going to be same as the one.

00:09:28.740 --> 00:09:32.740
 Yeah I was just going to say just another thing that came out of the meeting is the

00:09:32.740 --> 00:09:39.260
 exit for Brinker that temporary exit will be down for about a week at least that a week

00:09:39.260 --> 00:09:45.260
 is there what they're saying so again OHL works on football time so one week probably

00:09:45.260 --> 00:09:53.500
 means three weeks but we're in order to get to Mayhill exit you will have to actually

00:09:53.500 --> 00:09:56.420
 exit on 288 for that time period.

00:09:56.420 --> 00:10:08.020
 Yes so what happens is thanks about that so you've got your temporary offer up here and

00:10:08.020 --> 00:10:13.460
 your permanent is going to be here and so what they have to do in order to once they

00:10:13.460 --> 00:10:18.580
 build the permanent they got to have that closed in time for them to remove the temporary

00:10:18.580 --> 00:10:24.060
 so there will be a one week gap where if you want to get to Brinker or Mayhill coming from

00:10:24.060 --> 00:10:30.660
 the south from the north you'll have to exit and come through the loop but at that point

00:10:30.660 --> 00:10:35.260
 we should have two lanes of traffic on the frontage road to turn and two lanes to go

00:10:35.260 --> 00:10:41.700
 through and the U-turns in place so we're hoping that we offset the pain with a little

00:10:41.700 --> 00:10:49.600
 bit of capacity but yes there will be a one week period where you won't be able to get

00:10:49.600 --> 00:10:53.860
 to Brinker or Mayhill from the north.

00:10:53.860 --> 00:10:57.700
 To add to that staff will definitely look at the signal timings and add more green for

00:10:57.700 --> 00:11:04.780
 that particular approach so that people are not stuck and back up all the way to the freeway.

00:11:04.780 --> 00:11:16.660
 This is traffic engineering involved theory just like the curbs alright so that's pretty

00:11:16.660 --> 00:11:28.380
 much what I just told you there 35E here's the news so the I-35E 3535W merge in next

00:11:28.380 --> 00:11:33.580
 Thursday or whatever the fourth Thursday of the month is the draft unified transportation

00:11:33.580 --> 00:11:39.140
 plan shows this project being fully funded at three hundred and twenty million dollars

00:11:39.140 --> 00:11:44.540
 so it was a little over what we thought and less than what I thought so this project is

00:11:44.540 --> 00:11:53.140
 fully funded and it's looking for a hit date let date of January 2023 AECOM is doing the

00:11:53.140 --> 00:11:58.180
 design even as we speak they were working on an interim and an ultimate and now they're

00:11:58.180 --> 00:12:05.900
 just going straight for the ultimate so fully funded we got our money so that's additional

00:12:05.900 --> 00:12:15.020
 lanes on 35W going north the weave merge issues with 35E resolved the frontage roads in place

00:12:15.020 --> 00:12:20.580
 all the way to 77 your braided ramps in this area your improvements to the interchange

00:12:20.580 --> 00:12:25.700
 of 380 we're going to work with tech stack because the next project I got good news on

00:12:25.700 --> 00:12:33.620
 as well 1173 tie-in so we can fix this issue up here just north of look 288 which also

00:12:33.620 --> 00:12:45.780
 includes half of the direct connect for loop 288 so 320 million it's draft right now but

00:12:45.780 --> 00:12:51.060
 they've already published it to the public and they'll vote on it this coming next two

00:12:51.060 --> 00:12:56.580
 weeks or Thursday whatever the fourth Thursday of the month is that's bumper bricks so when

00:12:56.580 --> 00:13:01.580
 you say it's fully funded that's good news but is there is there a time limit to use

00:13:01.580 --> 00:13:09.380
 those funds once a project is fully funded yes so these are these are not just text dollars

00:13:09.380 --> 00:13:14.620
 they're clear lane funds and the clear lane funds the reason we were able to get the clear

00:13:14.620 --> 00:13:19.100
 lanes funds is this project's already environmentally clear we're already doing the design and we're

00:13:19.100 --> 00:13:24.020
 already acquiring the right-of-way so there's we that's what Todd and I were talking about

00:13:24.020 --> 00:13:29.540
 the good news is this project is now fully funded the bad news is they're gonna want

00:13:29.540 --> 00:13:35.300
 to hit that date as much as possible which means your Bonnie Bray improvements are now

00:13:35.300 --> 00:13:39.180
 under the bubble just about to ask you when is that supposed to be done improvements are

00:13:39.180 --> 00:13:44.460
 under the bubble and oh by the way if you've got any utilities in that corridor those are

00:13:44.460 --> 00:13:51.120
 under the bubble but I think Todd's been working with that preemptively so I might defer to

00:13:51.120 --> 00:13:55.980
 his wisdom if he wants to expect any of that yeah can you remind us when Bonnie Bray's

00:13:55.980 --> 00:14:02.900
 gonna be all in place so the target for Bonnie Bray is to be complete by the end of 2022

00:14:02.900 --> 00:14:09.580
 so we should be ahead there the challenge now is that Western has a very limited distance

00:14:09.580 --> 00:14:14.900
 that it covers four lanes it goes from Jim Crystal down to FM 1515 which will also be

00:14:14.900 --> 00:14:19.620
 under construction and not too distant future so what we've really got to find is a route

00:14:19.620 --> 00:14:27.740
 that allows Western to operate under this scenario from 380 all the way down to 2449

00:14:27.740 --> 00:14:34.020
 to be that relief route from north to south so as people enter into that merged construction

00:14:34.020 --> 00:14:39.460
 zone they're going to be looking for alternative routes with all of this I-35 construction

00:14:39.460 --> 00:14:44.740
 going on all at the same time our concern is that Bonnie Bray will get overloaded so

00:14:44.740 --> 00:14:50.740
 you really need that auxiliary bypass over off to the west which has not been our rate

00:14:50.740 --> 00:14:57.540
 on our radar until now it was something you know this project had been 2026 in the time

00:14:57.540 --> 00:15:02.020
 frame to start construction and it put us in a time frame bill allows more development

00:15:02.020 --> 00:15:07.260
 to come in potentially impact fees to build and West Park turds to help offset some of

00:15:07.260 --> 00:15:13.780
 the costs in that area along with some other development going on south of FM 1515 help

00:15:13.780 --> 00:15:19.380
 really push that arterial expansion but we may not have that luxury if we want to stay

00:15:19.380 --> 00:15:26.020
 ahead of construction woes may necessitate that we start looking at some other alternatives

00:15:26.020 --> 00:15:29.980
 or as John and I were talking about potentially asking the state could you push that date

00:15:29.980 --> 00:15:35.260
 back a year or two just so that we can figure out how we're going to handle this so we're

00:15:35.260 --> 00:15:41.700
 exploring those alternatives John really wasn't aware that this came down quickly over the

00:15:41.700 --> 00:15:47.300
 last two weeks so we're all still adjusting to what are the impacts from a mobility standpoint

00:15:47.300 --> 00:15:51.940
 and what are our options we're working on that but we don't we don't have all the answers

00:15:51.940 --> 00:15:59.820
 just yet just to follow up on that and for a reminder that this section is the project

00:15:59.820 --> 00:16:06.860
 that's going to help that 380 interchange right that backs up and it's so crazy so if we don't

00:16:06.860 --> 00:16:13.180
 have to postpone it a year or two I would prefer not to do that I would so post not

00:16:13.180 --> 00:16:20.300
 the right word typically okay you let the project on attrition drive it schedule a little

00:16:20.300 --> 00:16:26.380
 further out so these dates are going to be target dates the tech stops gonna really really

00:16:26.380 --> 00:16:32.180
 really try to hit but that typically means that they will slide some from what they think

00:16:32.180 --> 00:16:40.260
 is this is a guess what these steps are going to take so we'll continue like I say I'm I've

00:16:40.260 --> 00:16:44.700
 been around to that long time you got some pretty good horsepower in this room to get

00:16:44.700 --> 00:16:50.420
 this stuff done and I feel confident that we're up to the challenge is there a way to

00:16:50.420 --> 00:16:59.180
 phase it so that the parts we want most happen sooner just like we did on the OHL job absolutely

00:16:59.180 --> 00:17:07.420
 that wasn't what I meant once it's let the contractor has we could put stuff up front

00:17:07.420 --> 00:17:13.020
 which what that's what we need to do we'll meet with the task force and as they're putting

00:17:13.020 --> 00:17:19.420
 together the package we'll put in special provisions that you know like on 35 they couldn't

00:17:19.420 --> 00:17:23.820
 when they were doing the AGL they couldn't do two consecutive interchanges at a time

00:17:23.820 --> 00:17:30.100
 I mean there's things like that that we can do to try to to maximize the potential for

00:17:30.100 --> 00:17:36.420
 getting mobility back in a quarter and minimize the congestion during construction that sounds

00:17:36.420 --> 00:17:42.980
 good so 320 million projects fully funded now we're under the bubble for all kinds of

00:17:42.980 --> 00:17:52.500
 stuff to get done now your 35 north project this one also has been funded at five hundred

00:17:52.500 --> 00:18:00.220
 and forty six million dollars so you're talking about just under a billion dollars which to

00:18:00.220 --> 00:18:08.380
 put that in perspective text that actual dollars in 35e was about 660 million the rest of it

00:18:08.380 --> 00:18:15.180
 was RTR and TIFI alone so they've already got a higher investment in I-35 and the wishbone

00:18:15.180 --> 00:18:19.940
 and all these improvements here than they did in the section to the south so you're

00:18:19.940 --> 00:18:28.620
 talking again this one's a little bit closer because we're we are we've been out there

00:18:28.620 --> 00:18:33.780
 longer this project's been on the table forever and this was the one remember I've kept coming

00:18:33.780 --> 00:18:39.100
 to you going the region did not fund this project because we're playing chicken with

00:18:39.100 --> 00:18:43.980
 Austin to who's going to fund it because they can't not fund this project and so this is

00:18:43.980 --> 00:18:51.860
 now fully funded through clear lanes and category 12 funding so again this project is fully

00:18:51.860 --> 00:18:58.860
 funded and we're on a tighter schedule here there's on the section to the south so that's

00:18:58.860 --> 00:19:08.660
 what the bricks so without a manage lane or with this is recorded right without so can

00:19:08.660 --> 00:19:12.540
 we just take a moment it's a little hard for me to put this all together like how does

00:19:12.540 --> 00:19:19.180
 the timing then work you know and the impacts between this the wishbone and body break right

00:19:19.180 --> 00:19:26.700
 because this hits first and it's gonna back things up more right and there it is all right

00:19:26.700 --> 00:19:29.660
 so the challenge is going to be it's what we've been talking about for a couple years

00:19:29.660 --> 00:19:34.340
 now the challenge is going to be when the 35 construction goes you're going to have

00:19:34.340 --> 00:19:38.900
 a lot of changes in lanes you're going to have some traffic pushed over to frontage

00:19:38.900 --> 00:19:45.660
 roads I mean it's going to be a variety of things so as pressure builds on the i-35 quarter

00:19:45.660 --> 00:19:51.260
 like you're seeing on i-35e right now going south consistently as you come into the brinker

00:19:51.260 --> 00:19:58.860
 road in the loop 288 area backs up every day all the way up to at least mccormick on sometimes

00:19:58.860 --> 00:20:03.140
 other times it gets to fort worth drive it could go even further you're talking about

00:20:03.140 --> 00:20:08.340
 almost the exact same scenario everybody's trying to get two homes that are off of that

00:20:08.340 --> 00:20:13.580
 university drive exit how do you provide provision for them to get around it as they're working

00:20:13.580 --> 00:20:20.140
 the 380 interchange and try to make that better you're automatically gonna have folks using

00:20:20.140 --> 00:20:24.900
 their ways apps or whatever app they're using on their phone and it's going to drop them

00:20:24.900 --> 00:20:29.820
 down pathways that provide the least amount of resistance so bonnie bray is going to be

00:20:29.820 --> 00:20:34.820
 a key target for that but you know this is an even earlier time frame right we should

00:20:34.820 --> 00:20:41.020
 still be the time frames we currently have with bonnie bray we would be complete with

00:20:41.020 --> 00:20:46.500
 phase six so that's everything north of university drive that would be complete before summer

00:20:46.500 --> 00:20:54.220
 of 2022 so that's the date of september 20 let date of september 2022 basically means

00:20:54.220 --> 00:20:59.380
 that jay wouldn't probably start till the first quarter 2023 right because of the the

00:20:59.380 --> 00:21:04.540
 mobilization and the bonding and the contracting it's usually 60 to 90 days before they come

00:21:04.540 --> 00:21:10.060
 out and so the other special provisions we're going to try to add because of the dollar

00:21:10.060 --> 00:21:14.100
 amount if we can combine these two that's good if not it doesn't matter because they're

00:21:14.100 --> 00:21:20.700
 both fairly large is try to include in the special provisions of the same requirements

00:21:20.700 --> 00:21:26.620
 on them that we had on agl to have a public relations firm and their whole job is to keep

00:21:26.620 --> 00:21:33.820
 the corridor in the public involved in what's going on on a daily basis email alerts daily

00:21:33.820 --> 00:21:38.420
 lane closures etc and stuff like that that's that's all good i just want to if i can just

00:21:38.420 --> 00:21:45.300
 kind of want to get the big picture of the sequencing so so we get the northern part

00:21:45.300 --> 00:21:49.580
 of bonnie bray in place then that hits then we get the southern part of bonnie bray in

00:21:49.580 --> 00:21:56.420
 place then the wishbone construction hits that more or less the the big picture that

00:21:56.420 --> 00:22:01.020
 was our original timeline for bonnie bray was to come back and do phase four and five

00:22:01.020 --> 00:22:07.620
 once six is in place which is that segment between 35e and 380 we're not going to have

00:22:07.620 --> 00:22:14.900
 that luxury going forward so where we're potentially going with the 2019 bond schedule would be

00:22:14.900 --> 00:22:20.380
 all of bonnie bray under construction over the next two and a half years so that we are

00:22:20.380 --> 00:22:25.140
 ahead of this schedule and bonnie bray is done before it takes that were to kick off

00:22:25.140 --> 00:22:31.760
 the 35 construction john you had points just a couple of points one is there's there's

00:22:31.760 --> 00:22:36.220
 crossover between this project and the other that you see this one runs from 380 north

00:22:36.220 --> 00:22:40.460
 and the other one goes all the way up to 77 so you really only have four months difference

00:22:40.460 --> 00:22:45.020
 between the start dates one is september of 22 and one is january yeah good point the

00:22:45.020 --> 00:22:48.700
 wishbone that we were going after we were going after under the assumption that we wouldn't

00:22:48.700 --> 00:22:54.580
 get the funding for this so we do have the funding for both so the limits are actually

00:22:54.580 --> 00:23:04.260
 wishbone to 380 380 to the county line from a csj or project standpoint but we're reporting

00:23:04.260 --> 00:23:10.340
 it because it's all one giant project so so you're going to do that northern part twice

00:23:10.340 --> 00:23:25.940
 well wouldn't be the first time this is recorded right okay all right and so your 35 w main

00:23:25.940 --> 00:23:32.820
 lanes again this is hntv text i've picked them up to do the ultimate improvements from

00:23:32.820 --> 00:23:40.300
 the wishbone where we leave off all the way down to the kyan with tarrant county and and

00:23:40.300 --> 00:23:51.380
 so a little bit more nuance on the managed lanes on the on the section in the 35e project

00:23:51.380 --> 00:23:59.900
 in this area there will be the addition of because there are managed lanes proposed so

00:23:59.900 --> 00:24:05.260
 city of dentons not really have any managed lanes they in the interim they stopped in

00:24:05.260 --> 00:24:10.620
 the lake cities right but in the ultimate project there are managed lanes through the

00:24:10.620 --> 00:24:16.620
 city of denton and they narrow down to a single lane in each direction coming north because

00:24:16.620 --> 00:24:21.540
 the lane balance and they pick up and have two lanes in this area going north and two

00:24:21.540 --> 00:24:30.380
 lanes coming south from 380 so in the ultimate improvements they will build the area for

00:24:30.380 --> 00:24:33.760
 the managed lanes and so if i don't know if you've even noticed it when you go across

00:24:33.760 --> 00:24:41.380
 the bridge over 407 going south that bridge is built for four lanes of managed lanes two

00:24:41.380 --> 00:24:46.020
 in each direction they just simply have a barricaded off right now because we're only

00:24:46.020 --> 00:24:53.100
 using one lane in each direction i mean two lanes contraflow so we will be building the

00:24:53.100 --> 00:25:01.380
 ultimate managed lanes for this section of 35e and 35 as were per the plans that were

00:25:01.380 --> 00:25:08.200
 environmentally cleared so when you get to and there will be no managed lanes in this

00:25:08.200 --> 00:25:15.740
 segment however we're building it as a rural cross section rural cross section has the

00:25:15.740 --> 00:25:25.020
 same footprint as an urban plus or minus urban cross section with managed lanes so we're

00:25:25.020 --> 00:25:35.900
 leaving that option in the future although the proposal here is for a rural freeway so

00:25:35.900 --> 00:25:43.480
 then you get to 35w again it was started out its life as a managed lane project three two

00:25:43.480 --> 00:25:50.420
 two three three general purpose two managed lanes two managed lanes three general purpose

00:25:50.420 --> 00:25:56.860
 but in the political environment we found ourselves in we we converted it in the last

00:25:56.860 --> 00:26:03.020
 mobility plan to a rural freeway so it's just three three but in a larger footprint from

00:26:03.020 --> 00:26:10.100
 a right away standpoint to preserve the corridor so that's what they're doing on this job the

00:26:10.100 --> 00:26:18.620
 critical path time frame is a schematic approval because that ties into this project where

00:26:18.620 --> 00:26:24.700
 we're doing the frontage roads and and what communities along this corridor need right

00:26:24.700 --> 00:26:31.100
 now more than main lanes is frontage roads because you can't develop without them and

00:26:31.100 --> 00:26:36.840
 so if you see what's going on in this section to the south where we're adding frontage roads

00:26:36.840 --> 00:26:42.580
 as development comes in you're already seeing a significant amount of development it's actually

00:26:42.580 --> 00:26:47.460
 one under the knife before we even got these projects finished so the intent is to have

00:26:47.460 --> 00:26:53.240
 frontage roads continuous frontage roads from tarrant counting all the way to that project

00:26:53.240 --> 00:27:00.980
 that we just showed you that's fully funded now and this one is you know 300 million bucks

00:27:00.980 --> 00:27:07.320
 and it's got a what they call ready to let of 2023 which means all the right of ways

00:27:07.320 --> 00:27:13.300
 acquired and utilities are relocated but that's that's a tall order counselor bricks is this

00:27:13.300 --> 00:27:20.980
 the and the area where this committee made the decision regarding vintage and how this

00:27:20.980 --> 00:27:28.220
 freeway is going to exit or are not yet so yes ma'am in where 2449 comes in right around

00:27:28.220 --> 00:27:37.740
 in here I believe we only have grade separations or direct connects I mean from the west to

00:27:37.740 --> 00:27:43.580
 the north and the west to the south there's no vintage grade separations that allow you

00:27:43.580 --> 00:27:47.980
 to free flow onto the freeway you're gonna have to come to the box stop at a light and

00:27:47.980 --> 00:27:56.140
 then go and that was because when we drew out the direct connects to go tie into vintage

00:27:56.140 --> 00:28:02.460
 it went significantly into the neighborhoods and it essentially would have turned vintage

00:28:02.460 --> 00:28:10.980
 into a a arterial loop and I don't think y'all were interested in that so we just chopped

00:28:10.980 --> 00:28:16.380
 off the direct connects and it's a physical stop at a light for vintage but if you're

00:28:16.380 --> 00:28:23.860
 coming from 2449 it's a free flow north and a free flow south on the 35 w that's your

00:28:23.860 --> 00:28:28.620
 question yeah well I just wanted to update I don't know if you were hearing you any of

00:28:28.620 --> 00:28:33.980
 that from that conversation yeah so this is y'all do a lot of work on body brave vintage

00:28:33.980 --> 00:28:42.220
 and what that will encourage is you know easy flow but if you put a mondo direct connect

00:28:42.220 --> 00:28:46.100
 interchange which looks you know pretty much something like that what crosses that it would

00:28:46.100 --> 00:28:51.860
 make it easier for people to use that as a cut through as opposed to going home and so

00:28:51.860 --> 00:28:56.900
 all we did was cut the eastern half of the direct connect off so that you can only go

00:28:56.900 --> 00:29:05.980
 north and south from the west or west from the north and south and again this project

00:29:05.980 --> 00:29:11.500
 we're looking at 2023 to be ready to let they're put it out at 2025 because it's not funded

00:29:11.500 --> 00:29:17.780
 right now and that's just right outside the window that they have to play with but we're

00:29:17.780 --> 00:29:23.980
 moving and so once this project is environmentally cleared after the march 2020 and we get the

00:29:23.980 --> 00:29:29.020
 schematic set what we'll do then is we'll come in if there's a development in this area

00:29:29.020 --> 00:29:32.820
 that needs frontage then we'll just do like we did in the south we'll just build certain

00:29:32.820 --> 00:29:39.560
 sections because once it's clear we can build whatever part we want so it may not be built

00:29:39.560 --> 00:29:47.780
 consecutively as a 300 million dollar job it may be three or four you know 75 million

00:29:47.780 --> 00:29:59.420
 hundred million dollar jobs 380 east okay so these two we're probably at some point

00:29:59.420 --> 00:30:03.260
 in the near future going to break these out into two different projects because text that's

00:30:03.260 --> 00:30:08.620
 saying this project is going to be ready to go to construction faster than this section

00:30:08.620 --> 00:30:14.020
 is and they have a cash flow issue we have to spend some money but remember what I told

00:30:14.020 --> 00:30:19.660
 you there's all this money and all of it's sitting in Dallas County and Collin County

00:30:19.660 --> 00:30:23.660
 but if they can't get their act together they still have to spend the money and so this

00:30:23.660 --> 00:30:28.900
 segment although it's fully funded this segment is going to be ready faster and they have

00:30:28.900 --> 00:30:34.140
 to be able to spend some of that money in that let month so they're talking about working

00:30:34.140 --> 00:30:40.580
 with us to build the green section sooner than the blue because they need to spend the

00:30:40.580 --> 00:30:49.380
 money well that section includes sidewalks sidewalks and Europe and the staff did the

00:30:49.380 --> 00:30:58.300
 trail on that absolutely so February 2021 there may be a date that you're going to see

00:30:58.300 --> 00:31:03.580
 on next mobilities where this is broken out and you'll have an earlier date for the green

00:31:03.580 --> 00:31:10.220
 segment which is literally right around the corner so you won't be able to go south you

00:31:10.220 --> 00:31:16.980
 won't be able to go north and you won't be able to go east stay home go yet West young

00:31:16.980 --> 00:31:29.300
 man Luke 288 again this is a kind of where we were talking about a moment ago the direct

00:31:29.300 --> 00:31:34.100
 connects stop on the western side and they don't tie into vintage there's full interchanges

00:31:34.100 --> 00:31:40.900
 and direct connects at the existing loop 288 we are looking at April 2020 environmental

00:31:40.900 --> 00:31:46.940
 clients will allow us to move forward on this schedule this is a lot longer schedule what

00:31:46.940 --> 00:31:51.340
 they typically put in when they're guessing but because of the gas wells in this area

00:31:51.340 --> 00:31:57.120
 and more importantly the transmission lines in this corridor they have experienced difficulty

00:31:57.120 --> 00:32:02.460
 in this environment before so they're using those dates schedules for the process of getting

00:32:02.460 --> 00:32:08.580
 through those two steps the right away in acquisition which pushes your your project

00:32:08.580 --> 00:32:15.780
 that now with 35 being focused on now the district is the one that's been pushing the

00:32:15.780 --> 00:32:21.060
 loop for a long time so we feel fairly confident that you know as these projects get closer

00:32:21.060 --> 00:32:29.700
 to their maturation that we'll find the where's the dollar amount oh there it is we'll we'll

00:32:29.700 --> 00:32:42.140
 find the 253 million bucks we need to build the project and then FM 1515 we're having

00:32:42.140 --> 00:32:51.900
 a public meeting in August 29 on improvements here it will show a traffic circle into the

00:32:51.900 --> 00:32:59.140
 airport and buzzes back in town from Colorado so he says it's going to show a traffic circle

00:32:59.140 --> 00:33:08.580
 or what do you call it at Western and we're moving forward the schedule to you know be

00:33:08.580 --> 00:33:15.260
 ready to let in a couple years and it's 32 million bucks which sounds like a lot but

00:33:15.260 --> 00:33:20.460
 it's not and I think once we're get the project environmentally cleared we won't be long there

00:33:20.460 --> 00:33:26.220
 after to find the funds because again you the city is entering in an MOU with text out

00:33:26.220 --> 00:33:31.220
 for certain projects where once they're fully constructed to your desires we'll take them

00:33:31.220 --> 00:33:36.500
 off system and turn them into a local street and text up once that as much as you all want

00:33:36.500 --> 00:33:44.120
 it so we feel fairly confident once we get the project closer to its let date that we'll

00:33:44.120 --> 00:33:53.540
 have it funded as well same 1173 once now the 35 is operational for lack of a better

00:33:53.540 --> 00:33:59.980
 word 1173 takes on new life because if we don't get something done 1173 is already underwater

00:33:59.980 --> 00:34:06.580
 not literally in some places but figuratively from a traffic standpoint so we're probably

00:34:06.580 --> 00:34:12.740
 going to be meeting with Garver the contract the engineering firm and text out and finding

00:34:12.740 --> 00:34:19.820
 a way to maybe expedite this project because again 1173 is going to be this is tying into

00:34:19.820 --> 00:34:25.420
 an area that's not functional for lack of a better word right now and once we come in

00:34:25.420 --> 00:34:33.780
 and do the northern segment we'll need FN 1173 operational so we're fairly confident

00:34:33.780 --> 00:34:50.780
 on this job too 428 okay so the RTC in order to get the commission to be interested in

00:34:50.780 --> 00:34:56.060
 the 35s and some other projects in the other region they had to reshuffle chairs on the

00:34:56.060 --> 00:35:04.700
 deck to entice them the dollar amounts that the commission put on 35 and 35e were larger

00:35:04.700 --> 00:35:10.860
 than was anticipated so that means that Michael and RTC had what's called category two funds

00:35:10.860 --> 00:35:15.820
 that were on these projects that if the commission had to pick them up with cat 12 strategic

00:35:15.820 --> 00:35:21.660
 priority and cat 12 clear lanes he would have had to use those funds to make these dates

00:35:21.660 --> 00:35:27.020
 now that they've rolled in and picked these up those category two dollars are now freed

00:35:27.020 --> 00:35:33.940
 up for other things well Michael has been pushing the outer loop in the Collin Denton

00:35:33.940 --> 00:35:38.220
 County area longer than anybody has and when you have all the trauma that we're having

00:35:38.220 --> 00:35:45.620
 on 380 in this area we believe the outer loop because they essentially told us it's now

00:35:45.620 --> 00:35:51.860
 going to go back to being a fairly high priority quickly which drives the fact that 428 is

00:35:51.860 --> 00:35:58.620
 now a critical path item so we're going to be meeting with text up again we're meeting

00:35:58.620 --> 00:36:05.540
 with them in conjunction with your bond program but with the flexibility they now have with

00:36:05.540 --> 00:36:13.140
 the release on the 35 corridor we want to reorient them to this eastern quadrant where

00:36:13.140 --> 00:36:20.260
 you're already having development issues coming down the pack so we got a blank slate

00:36:20.260 --> 00:36:26.340
 right now but I'm thinking that very quickly as things happen in my world this will become

00:36:26.340 --> 00:36:31.100
 operational and we'll be able to give you better information on it going forward and

00:36:31.100 --> 00:36:48.860
 I believe that's it thank you thank you for joining us and thanks for your patience appreciate

00:36:48.860 --> 00:36:57.500
 you coming to visit so I'll call a lot item C receive a report and hold a discussion regarding

00:36:57.500 --> 00:37:05.900
 updates from the den county transportation authority thank you oh yeah oh receive report

00:37:05.900 --> 00:37:11.500
 hold the discussion no decisions well good morning and it's nice to be here Nicole usually

00:37:11.500 --> 00:37:18.380
 provides the update she's she's been out for a while she's recovering she's been ill for

00:37:18.380 --> 00:37:23.580
 a few months but she sends her best to you she says she misses you and can't wait to

00:37:23.580 --> 00:37:27.180
 come back so she it's not too often that people are really wanting to come back to work but

00:37:27.180 --> 00:37:31.380
 she's actually very very excited to come back soon so here she's not well I wasn't aware

00:37:31.380 --> 00:37:37.340
 of that yes thank you appreciate it well I'm here to talk to you about quiet zones so there's

00:37:37.340 --> 00:37:43.660
 10 quiet zones that recently the FRA came in and conducted a visit let's start with

00:37:43.660 --> 00:37:49.660
 kind of what is a quiet zone with regard to the railroad so in order to establish a quiet

00:37:49.660 --> 00:37:57.340
 zone the city actually submits a form to the FRA requesting the implementation of a quiet

00:37:57.340 --> 00:38:05.900
 zone a quiet zone is basically additional safety precautions that are put around a intersection

00:38:05.900 --> 00:38:13.020
 to basically allow the the engineer that's operating the train to not blow the horn as

00:38:13.020 --> 00:38:19.100
 they come into the approach of a of an intersection they typically start blowing the horn depending

00:38:19.100 --> 00:38:24.860
 on the speed about 15 seconds prior to entering the quiet zone they have to continue to sound

00:38:24.860 --> 00:38:29.940
 the horn as you can imagine that creates a lot of noise but it's a safety warning precaution

00:38:29.940 --> 00:38:37.460
 for pedestrians cyclists and and motorists as they cross requires basically to protect

00:38:37.460 --> 00:38:43.620
 the entire zone which is typically a four quadrant zone or four quadrant gate there's

00:38:43.620 --> 00:38:50.780
 directional horns that are localized sound that that carries down the corridor to notify

00:38:50.780 --> 00:38:57.820
 pedestrians and vehicular traffic warning of approach of a of a train and in addition

00:38:57.820 --> 00:39:04.860
 to that there's additional striping that's typically put on to the roadways that indicate

00:39:04.860 --> 00:39:09.780
 that you're approaching the railroad they're outside of what's called the right of way

00:39:09.780 --> 00:39:14.780
 which is typically 50 to 100 feet from the centerline of the track and that's the zone

00:39:14.780 --> 00:39:21.260
 that agency is usually responsible for so the city because the striping and the signage

00:39:21.260 --> 00:39:27.580
 as you approach a zone is responsible for the signage and striping and of course over

00:39:27.580 --> 00:39:35.660
 time these these warning striping and paint tend to wear and the original implementation

00:39:35.660 --> 00:39:44.740
 of the quiet zones was done at the implementation of the the a train service it is required

00:39:44.740 --> 00:39:51.460
 every five years to reapply for certification of the of the safety zone and here's some

00:39:51.460 --> 00:39:56.540
 some some of the safety measures that are typically put in place as you can see in the

00:39:56.540 --> 00:40:04.720
 top left that's the four quadrant gates the the railroad crossing pavement paint that

00:40:04.720 --> 00:40:09.440
 you see as you approach in the kind of bottom center and then some of the other precautions

00:40:09.440 --> 00:40:15.520
 that you can put in is subdividing the roads with medians and then approaching warning

00:40:15.520 --> 00:40:23.380
 signs that indicate whether the first one with the railroad crossing is to indicate

00:40:23.380 --> 00:40:28.180
 that there's no sounding of the horns as the train comes into the approach and so there's

00:40:28.180 --> 00:40:33.280
 different variations of protection that you can put along the street and of course as

00:40:33.280 --> 00:40:39.380
 you introduce trails it becomes more complicated because then you have not only traffic that's

00:40:39.380 --> 00:40:45.820
 coming up to the approach of across then you have traffic that's running parallel to the

00:40:45.820 --> 00:40:51.780
 to the railroad and so there's different safety precautions that that DCTA has to follow as

00:40:51.780 --> 00:40:57.380
 we're crossing intersections but we also work with the city's once a safety zone has been

00:40:57.380 --> 00:41:03.740
 put in or quiet zone in this case has been put in to make sure that we're protecting

00:41:03.740 --> 00:41:09.540
 pedestrians traffic have a question for you in regards to the paint because you said it's

00:41:09.540 --> 00:41:15.380
 the city's responsibility to maintain that paint is it the city's responsibility to notice

00:41:15.380 --> 00:41:20.580
 that it needs to be repainted or does DCTA reach out and say it's time we need our you

00:41:20.580 --> 00:41:25.500
 know or do we have a process for that to make sure that you know it's getting done that

00:41:25.500 --> 00:41:33.540
 is a phenomenal question thank you typically DCTA hires inspectors and they're on the railroad

00:41:33.540 --> 00:41:41.940
 almost every day looking for everything from railroad ties bridge the quality of the bridge

00:41:41.940 --> 00:41:48.780
 and the health of the ride and all of these things signal systems the crossings.

00:41:48.780 --> 00:41:54.540
 Since the inception of the train system we tend to take care of everything that's within

00:41:54.540 --> 00:42:02.320
 that 50 feet because it's the paint is on the streets our inspectors have not been asked

00:42:02.320 --> 00:42:07.220
 to look at that in the past in a new railroad you typically it's like buying a brand new

00:42:07.220 --> 00:42:11.860
 car right you tend to not worry too much about maintenance as it starts getting older you

00:42:11.860 --> 00:42:14.980
 have to make sure that you're maintaining it and of course you should be looking at

00:42:14.980 --> 00:42:21.980
 it every every few years so it's something that that the city staff and DCTA have discussed

00:42:21.980 --> 00:42:27.220
 that we need to make sure that we have a good process in place the inspection every five

00:42:27.220 --> 00:42:33.660
 years by the FRA and the the actually they come in more often than that the the recertification

00:42:33.660 --> 00:42:40.820
 every five years is to ensure that we are looking at at those types of quality issues

00:42:40.820 --> 00:42:49.820
 that may spur a need for a project so in 2017 DCT actually hired a contractor to come in

00:42:49.820 --> 00:42:56.020
 and recertify the quiet zones we did they inspect them at the time apparently the inspection

00:42:56.020 --> 00:43:01.020
 did not indicate that the wear was at the point that they needed to be replaced it wasn't

00:43:01.020 --> 00:43:09.100
 until July 30th after the event with the cyclist the bicycle incident that the FRA sent inspectors

00:43:09.100 --> 00:43:14.700
 in and that's commonplace that when there's incidents they did it a few years prior and

00:43:14.700 --> 00:43:19.140
 it's very commonplace when there's incidents along the railroad that they'll send their

00:43:19.140 --> 00:43:25.860
 inspection team to do a review so they met with city staff DCTA staff they went to Brinker

00:43:25.860 --> 00:43:32.220
 they looked at a couple of other locations and as part of that process since the recertification

00:43:32.220 --> 00:43:41.700
 in 2017 they indicated that the the the pavement paint restriping needed to be redone as you

00:43:41.700 --> 00:43:47.580
 can imagine with foliage it tends to grow over signage over time we've had a lot of

00:43:47.580 --> 00:43:54.180
 rain over the last few years but the railroad typically focuses on what they call the right

00:43:54.180 --> 00:43:59.380
 away of the railroad and then we work with the city hand-in-hand to make sure that all

00:43:59.380 --> 00:44:03.700
 the approach and signage and painting and everything needs to be taken care of and so

00:44:03.700 --> 00:44:09.300
 this really caught us off guard a little bit with the FRA not that and it's not that they

00:44:09.300 --> 00:44:15.300
 caught us off guard it's just that they they will continuously do unscheduled visits and

00:44:15.300 --> 00:44:21.260
 in this case they notified us that they were coming pre-tem was there were several folks

00:44:21.260 --> 00:44:27.900
 from the city from DCTA and they usually do a great job of of adding advice as they look

00:44:27.900 --> 00:44:34.260
 at things and suggestions of things that we need to work on so I'd like to add to that

00:44:34.260 --> 00:44:39.100
 in the past city has not had a program per se to go and look at all these quiet zones

00:44:39.100 --> 00:44:44.460
 as we move forward to implementing more quiet zones with the Union Pacific Railroad line

00:44:44.460 --> 00:44:51.060
 as well as DCTA we will have a program in place starting now we will start reviewing

00:44:51.060 --> 00:44:57.940
 all these quiet zones markings and signs on a regular basis most likely it might be every

00:44:57.940 --> 00:45:04.700
 two years we were not sure at this point what timeline but we will have frequent and periodical

00:45:04.700 --> 00:45:08.500
 inspections to make sure that everything is lined similar to what we're doing with the

00:45:08.500 --> 00:45:16.420
 crosswalks throughout the city thank you and so I assume that there's not really a budget

00:45:16.420 --> 00:45:22.940
 for that right now as far as and so we'll need to do look for right away for the areas

00:45:22.940 --> 00:45:29.100
 for the signs to trim that back as well and the painting so it will be to it will be covered

00:45:29.100 --> 00:45:34.300
 under our operation and maintenance cost o and m costs for the traffic operations group

00:45:34.300 --> 00:45:41.460
 they do that all around the city maintain markings and signs clear signs so it's more

00:45:41.460 --> 00:45:47.300
 of a proactive approach especially with the quiet zones and we already have one for the

00:45:47.300 --> 00:45:52.500
 for the crosswalks okay thank you and we'll be looking at our procedures as well to make

00:45:52.500 --> 00:45:56.260
 sure that our inspectors as they're inspecting the rail line are looking for those types

00:45:56.260 --> 00:46:06.500
 of issues as they come up I think this is what the mayor calls scar tissue as I mentioned

00:46:06.500 --> 00:46:13.100
 in 2017 all the quiet zones in Denton were recertified by the FRA so literally two years

00:46:13.100 --> 00:46:17.400
 ago there wasn't any indication that there was an issue again this has to do with with

00:46:17.400 --> 00:46:22.140
 wear and tear it's not to say that that condition didn't exist it just didn't come up as part

00:46:22.140 --> 00:46:28.860
 of the recertification program so I'm gonna move this conversation along so on the on

00:46:28.860 --> 00:46:36.500
 the 30th we received the notice if there's more than one or two crossings if it's a crossing

00:46:36.500 --> 00:46:41.540
 typically they'll give you notice and they'll give you some time to rectify the situation

00:46:41.540 --> 00:46:45.020
 when there are multiple crossings as you can imagine all these areas were painted at the

00:46:45.020 --> 00:46:50.900
 same time so you likely all the paint is going to start deteriorating relatively at the same

00:46:50.900 --> 00:46:58.220
 time and that was the case so what they did is they decertified all ten crossings but

00:46:58.220 --> 00:47:02.700
 some of the crossings didn't have an issue it's just a process that you have to follow

00:47:02.700 --> 00:47:07.700
 so the city immediately turned back in a few days and said well there's four crossings

00:47:07.700 --> 00:47:12.740
 that don't have an issue we were but we needed to make sure that we had consistency so that

00:47:12.740 --> 00:47:18.180
 we we could start not blowing the horn as we went through some of these crossings I

00:47:18.180 --> 00:47:26.740
 want to thank city staff the the speed at which they took care of it the cooperation

00:47:26.740 --> 00:47:32.100
 that we had between our staff and the city staff was quite impressive I'm glad to say

00:47:32.100 --> 00:47:39.180
 that from July 30th as of yesterday we stopped blowing horns at all crossings the staff really

00:47:39.180 --> 00:47:43.460
 focused on it did an exceptional job so thank you for that and there's a couple of more

00:47:43.460 --> 00:47:48.300
 crossings that we need to address and I'm going to move through some of these unless

00:47:48.300 --> 00:47:52.900
 you have questions so here are the list of them all the crossings that they said were

00:47:52.900 --> 00:47:59.340
 deficient but as you can see at pockers page there was no deficiency there was a recommendation

00:47:59.340 --> 00:48:05.900
 that we turn the trees back some of the others had no deficiencies they did suggest that

00:48:05.900 --> 00:48:15.620
 Colorado Boulevard and Brinker that the approach of the trail kind of comes to a tee to sidewalk

00:48:15.620 --> 00:48:22.500
 because there's no cut through the median that allows the trail to continue and it's

00:48:22.500 --> 00:48:29.580
 what it has caused is it creates some innovative approaches from the folks that are on bicycles

00:48:29.580 --> 00:48:35.780
 to get around not having to get off of their bike across the street or take a left or right

00:48:35.780 --> 00:48:43.340
 go to the controlled intersection and back over and I can tell you that the imagination

00:48:43.340 --> 00:48:48.080
 that people use to not get off their bike is pretty impressive we've had we've installed

00:48:48.080 --> 00:48:52.780
 we've hired a consulting engineering firm to look at the entire railroad end to end

00:48:52.780 --> 00:48:58.060
 or the entire crossing and as it crosses the railroad and make recommendations for safety

00:48:58.060 --> 00:49:03.500
 improvements which we have made significant improvements over the last two years and by

00:49:03.500 --> 00:49:10.580
 installing Z crossings which requires the cyclist to maneuver through chain link fence

00:49:10.580 --> 00:49:15.660
 so that they're actually looking hopefully both ways before they cross the railroad but

00:49:15.660 --> 00:49:22.260
 as you can imagine we've installed those we met some opposition from the cycling community

00:49:22.260 --> 00:49:27.220
 because it does cause them to and I can understand as a cyclist you don't want to break your

00:49:27.220 --> 00:49:33.020
 rhythm but it does require you to break your rhythm and pay attention to the rail crossing

00:49:33.020 --> 00:49:38.740
 while we're seeing where they're managing to get all the way around the Z crossings

00:49:38.740 --> 00:49:44.460
 and so it's a constant challenge to try to help people be safe but it's not always the

00:49:44.460 --> 00:49:51.260
 safest thing in this case the FRA did come in and recommend suggests that we make cuts

00:49:51.260 --> 00:49:58.100
 through the medium so that the folks that are on bicycles and pushing their kids on

00:49:58.100 --> 00:50:03.340
 strollers can make a better transition across those two intersections and we're working

00:50:03.340 --> 00:50:07.620
 with the city and believe the engineering is almost complete on those two cut sections

00:50:07.620 --> 00:50:14.140
 DCTA is actually going to fund those and hire the contractor so that we can get those done

00:50:14.140 --> 00:50:17.940
 as soon as we can.

00:50:17.940 --> 00:50:21.220
 The other quiet zones that we're working on is that outside this list?

00:50:21.220 --> 00:50:22.220
 Correct.

00:50:22.220 --> 00:50:27.020
 Okay so is there a way to pull sort of an extra win out of this little setback by just

00:50:27.020 --> 00:50:32.500
 because of the fact that we've got their attention and to maybe use this moment to move forward

00:50:32.500 --> 00:50:35.540
 on the other quiet zones we're trying to achieve?

00:50:35.540 --> 00:50:39.420
 So the other quiet zones are on Union Pacific Railroad.

00:50:39.420 --> 00:50:45.220
 It's a whole different system, different ballgames, different corridor, completely different.

00:50:45.220 --> 00:50:48.660
 Okay no competition between the two?

00:50:48.660 --> 00:50:52.340
 And by the way the FRA wasn't picking on the city of Denton.

00:50:52.340 --> 00:50:56.060
 They've already notified the city of Louisville and like Dallas and everyone along the corridor

00:50:56.060 --> 00:51:01.660
 that they're coming through making these these inspections and once they start seeing some

00:51:01.660 --> 00:51:07.340
 deterioration and they're focused on a corridor they actually and it's a great partnership

00:51:07.340 --> 00:51:08.340
 with the FRA.

00:51:08.340 --> 00:51:12.860
 We've always had a really good relationship with them and they come in and they suggest

00:51:12.860 --> 00:51:18.500
 and they advise and in this case they said as soon as you've made the repairs you don't

00:51:18.500 --> 00:51:23.460
 have to file a report just send us an email so you can stop blowing the horn because they

00:51:23.460 --> 00:51:27.660
 do care a lot not only about passenger safety but working in partnership with the cities

00:51:27.660 --> 00:51:32.180
 and the railroads and so my thanks actually goes out to the FRA as well for for their

00:51:32.180 --> 00:51:35.220
 cooperation and partnership.

00:51:35.220 --> 00:51:43.300
 So that concludes the the presentation on the quiet zones unless there's something else

00:51:43.300 --> 00:51:47.060
 that you would like to know or have questions about.

00:51:47.060 --> 00:51:56.520
 And then I had one other thing I was asked to to quickly respond to a bus stop at West

00:51:56.520 --> 00:52:01.580
 Bound University at Bell we had a contractor we'd asked to move it we had some stakeholder

00:52:01.580 --> 00:52:04.140
 input about the stop.

00:52:04.140 --> 00:52:08.900
 I'm hearing today this morning that it was actually a stop and I'm going to ask Troy

00:52:08.900 --> 00:52:14.700
 to come in come up and speak to this particular issue but we moved the stop we started getting

00:52:14.700 --> 00:52:20.860
 complaints because crime started going up it caused some additional traffic, congestion

00:52:20.860 --> 00:52:26.740
 and so what we decided to do is move the stop back but I'm hearing this morning that maybe

00:52:26.740 --> 00:52:31.100
 our contractor moved the wrong stop which happens every once in a while Troy?

00:52:31.100 --> 00:52:42.620
 Yeah go ahead and it'll be easier for you at the mic better press first of all I think

00:52:42.620 --> 00:52:45.780
 we need to clarify what the problem is.

00:52:45.780 --> 00:52:50.900
 I went out and observed the intersection and the problem isn't the westbound traffic in

00:52:50.900 --> 00:52:57.260
 the westbound stop it's the one going northbound Bell when they stop to pick someone up the

00:52:57.260 --> 00:53:03.660
 people heading north on Bell back up into the intersection of University and that obstructs

00:53:03.660 --> 00:53:08.220
 the westbound traffic so it's actually a different stop that's the problem.

00:53:08.220 --> 00:53:12.220
 So we're going to move that stop we've got to go through a notification process there

00:53:12.220 --> 00:53:18.540
 is quite a bit of ridership at that stop and they'll have to go north 400 feet to the next

00:53:18.540 --> 00:53:23.580
 stop and that gives you enough payment for it because it is just one lane there so if

00:53:23.580 --> 00:53:29.580
 you've got people behind the bus at the south side of University trying to go north then

00:53:29.580 --> 00:53:35.220
 we've got to give them enough room to get up in there in the bus to load if that makes

00:53:35.220 --> 00:53:42.700
 sense. So we're working on it and we hope to have it moved in the next 30 days and then

00:53:42.700 --> 00:53:48.300
 this problem should relieve itself okay thank you.

00:53:48.300 --> 00:53:50.660
 No further questions all right thank you very much.

00:53:50.660 --> 00:53:57.140
 I do have one because I know you you got a phone call from our city staff this last week

00:53:57.140 --> 00:54:06.020
 with I think she might actually be here today but a concern with all the construction going

00:54:06.020 --> 00:54:12.820
 on yes and the rerouting of route 7 that no longer goes past Fraser Ranch has that been

00:54:12.820 --> 00:54:17.620
 have we worked on those routes? Actually fortuitously Troy has actually been

00:54:17.620 --> 00:54:22.420
 reaching out I don't Troy do you want to speak to that real quick sorry to make you talk

00:54:22.420 --> 00:54:33.220
 again but as it stands right now we don't have a good path we have to touch Presbyterian

00:54:33.220 --> 00:54:39.260
 Hospital because we have a lot of clients that go to the various medical establishments

00:54:39.260 --> 00:55:06.180
 on that campus.

00:55:06.180 --> 00:55:10.900
 As it stands we've got to touch this area out here and currently we've got a lot of ridership

00:55:10.900 --> 00:55:16.460
 that goes to medical establishments here on scripture but the 35 foot bus does not make

00:55:16.460 --> 00:55:24.220
 it down that street so we're having to drop those people on those passengers on the parking

00:55:24.220 --> 00:55:31.180
 lot at Presby and we've got a small vehicle stationed there every day to transport those

00:55:31.180 --> 00:55:36.780
 people back down to MHMR because a lot of them can't walk that distance back down the

00:55:36.780 --> 00:55:43.180
 street so at this time we can't move and not being able to go up Bonnie Bray we're having

00:55:43.180 --> 00:55:48.580
 to go up the service road and it's going to continue that way until Bonnie Bray opens

00:55:48.580 --> 00:55:58.300
 up all the way from Oak to University but I think the concern was that you then go back

00:55:58.300 --> 00:56:08.620
 up by the old hospital up on the west side of 35 and then turn around and come back well

00:56:08.620 --> 00:56:16.800
 anybody that was previously getting off at Razor Ranch at one of those stops now has

00:56:16.800 --> 00:56:21.740
 to get off on the other side of 35 and walk back across.

00:56:21.740 --> 00:56:28.420
 And to address that problem what we've done is in the August 26 schedule they can catch

00:56:28.420 --> 00:56:35.060
 Route 4 and come back there's a transfer point right out there there's a dialysis clinic

00:56:35.060 --> 00:56:39.640
 or some other medical establishments out there in that area that's what the ridership that's

00:56:39.640 --> 00:56:46.140
 why we touch that area but in August 26 we've changed the schedule so that they have time

00:56:46.140 --> 00:56:51.700
 to transfer they can remain on the bus until the other bus arrives and then they can transfer

00:56:51.700 --> 00:56:56.820
 to Route 4 and get back down University you know I kind of applause for a little housekeeping

00:56:56.820 --> 00:57:00.940
 just because we're closing in on the bottom there do you have any flexibility on the ending

00:57:00.940 --> 00:57:10.420
 time for 15 more minutes okay and and we've got a citizen wishing to speak but it this

00:57:10.420 --> 00:57:16.420
 notes that you're looking to speak on the on 05 3 which was the decent which is the

00:57:16.420 --> 00:57:25.200
 on system that you wanted to speak on this item okay all right so when we complete the

00:57:25.200 --> 00:57:33.500
 presentation then I'll have you come up okay sorry might I suggest that we allow her to

00:57:33.500 --> 00:57:40.180
 speak so that we can we can understand the issue yes Troy has I had asked Troy personally

00:57:40.180 --> 00:57:45.940
 to reach out to you to understand exactly what the issue is so that we can try to address

00:57:45.940 --> 00:57:53.260
 it I don't even know who you're addressing yet so you know so okay if you come up to

00:57:53.260 --> 00:57:59.500
 the mic thank you state your name and address you know three minutes and what's no right

00:57:59.500 --> 00:58:05.180
 up here and yeah yep and after you state your name and address your time will begin thank

00:58:05.180 --> 00:58:15.100
 you Eva Greco 802 West Oak Street in Denton I ride that I work on University in the razor

00:58:15.100 --> 00:58:24.260
 ranch area I ride the seven bus every day unfortunately it stops running and when I

00:58:24.260 --> 00:58:34.140
 get out of work so I have to look for transportation or take an uber home the way the bus is running

00:58:34.140 --> 00:58:41.100
 now I have to get off I left work early yesterday and it was just plain heat exhaustion because

00:58:41.100 --> 00:58:50.060
 every day I have to get off behind the Waffle House and walk back towards University to

00:58:50.060 --> 00:58:57.140
 get to my job it's very very dangerous and it's not just myself it's other passengers

00:58:57.140 --> 00:59:05.740
 also with this heat it's really horrible it's just horrible as far as connecting with the

00:59:05.740 --> 00:59:14.540
 number four bus before the schedule was changed the number four bus was there waiting okay

00:59:14.540 --> 00:59:21.900
 now if I get off behind Waffle House let's say the number four next number four bus is

00:59:21.900 --> 00:59:30.780
 not for 40 minutes as it is now because of the new bus schedule change I have to leave

00:59:30.780 --> 00:59:41.960
 my house now at least an hour before I have to be at work the buses the schedule keeps

00:59:41.960 --> 00:59:52.780
 changing which is a big problem for everyday passengers okay there is no communication

00:59:52.780 --> 01:00:05.100
 with DCTA at all the communication is horrible traffic is rerouted to come down panhandle

01:00:05.100 --> 01:00:11.340
 every time there's construction you know buses are rerouted onto the side streets and I live

01:00:11.340 --> 01:00:16.460
 right in the middle of the historic district so it's been rerouted quite a few times comes

01:00:16.460 --> 01:00:25.420
 right past my apartment and I don't see why the bus can't take the side streets I know

01:00:25.420 --> 01:00:33.220
 there's infrastructure issues but right now you have and I have seen it tractor trailers

01:00:33.220 --> 01:00:39.660
 coming through the side streets because of the you know closing off and I'm sorry excuse

01:00:39.660 --> 01:00:47.980
 my back everyone um you have heavy vehicles coming through the side streets now because

01:00:47.980 --> 01:00:54.380
 of the construction and we just can't see you have minimum seven bus stops that are

01:00:54.380 --> 01:01:02.460
 being bypassed passengers are not made aware of this when this first happened you're standing

01:01:02.460 --> 01:01:10.480
 at a bus stop and waiting and waiting and a bus is never coming because it's been rerouted

01:01:10.480 --> 01:01:17.340
 there is no signage there is no notification there is I still have a January schedule there

01:01:17.340 --> 01:01:25.980
 is no note schedules are not up on the buses you know okay thank you I really appreciate

01:01:25.980 --> 01:01:31.500
 you taking the time to come to two public meetings to make us aware I hope you feel

01:01:31.500 --> 01:01:35.500
 that you know you're gonna you're gonna hear response from like the president of DCTA

01:01:35.500 --> 01:01:39.940
 somebody was supposed to call me back last week and nobody's called me yeah so so so

01:01:39.940 --> 01:01:50.500
 so when so once you go if you'll leave the mic to those folks let's let's get a response

01:01:50.500 --> 01:01:55.900
 do you want to give any response now for us um let me see if I can where are you coming

01:01:55.900 --> 01:01:59.860
 from ma'am where you where are you coming from what's your origination of your trip

01:01:59.860 --> 01:02:06.300
 where are you getting on to the route seven um I get out by uh West Oak and Desing Street

01:02:06.300 --> 01:02:12.180
 in front of Dr. Simms office okay we're still going down that corridor right seven still

01:02:12.180 --> 01:02:20.100
 goes down that corridor yes it does so your issue is is getting from and we can do this

01:02:20.100 --> 01:02:24.740
 offline if y'all want let's do this I mean I'd like you to if you can't address the parts

01:02:24.740 --> 01:02:30.620
 that are you know general general you know impact like so notification about route changes

01:02:30.620 --> 01:02:35.460
 and yes the general issues yes thank you I'll try to wrap it up quickly but we will if you'll

01:02:35.460 --> 01:02:38.820
 stay with us we will meet offline thank you I'm glad you're here today because we have

01:02:38.820 --> 01:02:44.740
 been trying to reach you so that we could address the issue there is a an application

01:02:44.740 --> 01:02:48.860
 that you can download that will notify you it's not even an application you can just

01:02:48.860 --> 01:02:54.780
 subscribe to our rider alerts that anybody that's using our service will get alerted

01:02:54.780 --> 01:03:02.420
 as to when we're making service changes not only service changes but if there is a a reroute

01:03:02.420 --> 01:03:09.580
 of our buses which can happen without a lot of notice to us university can also put barricades

01:03:09.580 --> 01:03:15.940
 in and so we you're correct we are seems like we're always rerouting somewhere our our method

01:03:15.940 --> 01:03:20.860
 to reach out to people quickly is through our rider alert service and that'll at least

01:03:20.860 --> 01:03:28.500
 inform you when we're having to make changes because we travel through these roads as frequently

01:03:28.500 --> 01:03:35.420
 as eight minutes 15 minutes there's a tremendous amount of frequency of these vehicles having

01:03:35.420 --> 01:03:39.740
 to get up and down roads and what we need to make sure of is not only that we can get

01:03:39.740 --> 01:03:44.920
 down a road but that we can get down and make the appropriate turn so that we have the ability

01:03:44.920 --> 01:03:50.100
 to continue on our route when we get into neighborhoods it definitely creates a dangerous

01:03:50.100 --> 01:03:56.540
 situation and because we have so much frequency and we don't have the luxury much like an

01:03:56.540 --> 01:04:00.180
 18-wheeler deciding when they're actually going to go down one of those side streets

01:04:00.180 --> 01:04:06.100
 that's a very dangerous practice but safety is at the top of our priority we want to make

01:04:06.100 --> 01:04:10.220
 sure that we're not disrupting people that are living in these neighborhoods so to start

01:04:10.220 --> 01:04:14.900
 rerouting a lot of buses through the neighborhoods we have to take a lot of concern we also have

01:04:14.900 --> 01:04:19.120
 to make sure that if a bus could actually turn down the street depending on whether

01:04:19.120 --> 01:04:23.460
 it's turning right or left whether we can actually do that safely because it's not creating

01:04:23.460 --> 01:04:30.860
 a blind spot and you do that so often whereas maybe a heavy truck does it once we're doing

01:04:30.860 --> 01:04:37.100
 it every day five to six times a week it becomes a concern for us so there's only so many ways

01:04:37.100 --> 01:04:41.940
 we can maneuver in a neighborhood to get where we need to go but we'll do a better job and

01:04:41.940 --> 01:04:46.240
 I'll make sure that we meet with you offline on those particular issues that you're bringing

01:04:46.240 --> 01:04:47.240
 to concern.

01:04:47.240 --> 01:04:49.380
 Committee members are getting restless to get a couple questions in.

01:04:49.380 --> 01:04:54.120
 Councilmember Ryan.

01:04:54.120 --> 01:04:58.500
 Just a suggestion because I didn't I knew that timing on the route is a big thing so

01:04:58.500 --> 01:05:01.740
 trying to and trying to make a u-turn is a big thing but now finding out that you all

01:05:01.740 --> 01:05:06.940
 have another bus that sets at Presbyterian a small bus that sits there and takes them

01:05:06.940 --> 01:05:13.460
 throughout the medical could you.

01:05:13.460 --> 01:05:14.820
 Because we can't get our bus down.

01:05:14.820 --> 01:05:21.900
 Okay yeah okay but in that area that because of the cycle time of that bus route could

01:05:21.900 --> 01:05:27.980
 that bus also pick up people that need to go to razor run through you know run them

01:05:27.980 --> 01:05:32.180
 over there again a small bus can turn around easier than a big bus keeps your big bus on

01:05:32.180 --> 01:05:34.620
 time that bus driver is already sitting there.

01:05:34.620 --> 01:05:44.780
 I don't know what how to take a look at it sure if you could look at the time yeah right

01:05:44.780 --> 01:05:51.700
 sorry you began hearing let's move the mic I don't know because at the same time you're

01:05:51.700 --> 01:05:56.300
 not dropping off people at razor you're also not picking up people at razor and councilmember

01:05:56.300 --> 01:06:02.020
 Briggs did you have something you wanted to okay I'd like to get a staff report as a follow-up

01:06:02.020 --> 01:06:09.460
 on just what the procedure is for for informing riders of route changes yeah I think that's

01:06:09.460 --> 01:06:16.740
 we go through a very rigorous we're required to by the FTA to go through a very rigorous

01:06:16.740 --> 01:06:23.600
 process where we actually hold stakeholder forms we put notifications in the paper we

01:06:23.600 --> 01:06:29.780
 have open we try to reach or go to places where we can impact the most people and notify

01:06:29.780 --> 01:06:35.740
 them the DTC libraries different places post postings at the bus stop sign post postings

01:06:35.740 --> 01:06:40.500
 I don't I don't know that we put a posting on every bus stop sign we have 400 plus bus

01:06:40.500 --> 01:06:47.180
 stop signs but nobody but I mean at the at the pardon me understand and I'm not here

01:06:47.180 --> 01:06:54.980
 to you know I'm just responding to what I'm hearing you know the sort of clear suggestion

01:06:54.980 --> 01:07:02.100
 of the situation if it's as it sounds is that on the bypass stops you'd want to have something

01:07:02.100 --> 01:07:08.300
 present to let you know this isn't active now you know right like if that if it's the

01:07:08.300 --> 01:07:12.460
 way just the way it sounds to me I'm just hearing what we're hearing if seven seven

01:07:12.460 --> 01:07:15.660
 stops are passed you wouldn't want people standing there not knowing that nothing's

01:07:15.660 --> 01:07:25.420
 gonna come sure don't walk so far away the only stops that were not active at this point

01:07:25.420 --> 01:07:31.420
 are the ones that are on Bonnie Bray we still have service to the other stops on the university

01:07:31.420 --> 01:07:37.140
 seven doesn't go through there obviously the four still go through there so you're talking

01:07:37.140 --> 01:07:42.500
 just a handful of stops that we are no longer served yeah more to this point maybe we can

01:07:42.500 --> 01:07:47.980
 put some kind of bag over that says not signs not active yeah even if it's one right this

01:07:47.980 --> 01:07:52.180
 you know don't wait here suggestion because we're breaks did you want to add something

01:07:52.180 --> 01:07:58.020
 now all right are we are we good for today and then you'll be following up with the speakers

01:07:58.020 --> 01:08:03.460
 thank you thank you very much all right we've got to do a little housekeeping we have six

01:08:03.460 --> 01:08:09.860
 more borrowed minutes potentially what our staff priorities are councilman Briggs so

01:08:09.860 --> 01:08:15.820
 I requested the vision zero presentation mostly as a step to get it to council so that we

01:08:15.820 --> 01:08:21.980
 could pass a resolution so if it's okay with this committee we just can move that presentation

01:08:21.980 --> 01:08:28.260
 up to a work session or get it somehow if because I'm completely in favor of it especially

01:08:28.260 --> 01:08:32.820
 with all the traffic and everything and the construction we have going on I think it would

01:08:32.820 --> 01:08:43.700
 be a good consideration no objection okay so is can can you move forward with that and

01:08:43.700 --> 01:08:52.900
 then then we would just move on to E if you do do you want to do item E with us in the

01:08:52.900 --> 01:08:58.940
 time we have is that is that adequate can we do e pre temp yes okay so open so we're

01:08:58.940 --> 01:09:03.300
 going to move item D up to work session and I'll open item E receive a report and hold

01:09:03.300 --> 01:09:07.520
 the discussion regarding the city of Denton mobility plan work completed and plan future

01:09:07.520 --> 01:09:17.340
 task items and the market set Pam will she's going to slip skip over a few slides so that

01:09:17.340 --> 01:09:31.420
 I will talk quickly I just noticed yours 14 okay so basically the update is we had a technical

01:09:31.420 --> 01:09:36.980
 stakeholder committee meeting on July 11th we had our first round of public meetings

01:09:36.980 --> 01:09:44.020
 we had two we are scheduling a third one this month on the 22nd we the consultant collected

01:09:44.020 --> 01:09:51.740
 a lot of data we're looking at existing conditions I wanted to share some of the boards we had

01:09:51.740 --> 01:09:58.460
 set up at the public meetings the timeline basically what is a mobility plan so these

01:09:58.460 --> 01:10:04.820
 are the boards we received feedback on bicycle facilities and we will be sharing the results

01:10:04.820 --> 01:10:11.140
 next month and this is some of the data the consultants pulled for existing conditions

01:10:11.140 --> 01:10:19.620
 roadways bicycle pedestrians this is all saved online so you can look at those numbers later

01:10:19.620 --> 01:10:25.620
 this next month the biggest push is we're going to continue collecting citizen feedback

01:10:25.620 --> 01:10:32.240
 we're going to be developing the results sharing the next month and then starting some travel

01:10:32.240 --> 01:10:39.420
 demand modeling Ryan and Stephanie have done a fabulous job they've created a page online

01:10:39.420 --> 01:10:48.340
 there's the link and in there you will find the survey which has 20 very quick 25 questions

01:10:48.340 --> 01:10:54.980
 and there's an interactive map people can leave comments on for things to collect and

01:10:54.980 --> 01:11:03.060
 will the staff will the team will look into those as we move forward and that's it thank

01:11:03.060 --> 01:11:14.060
 you there's a couple of record I pointed out to Sarah and the committee what is it called

01:11:14.060 --> 01:11:18.540
 committee on citizen engagement just there are a couple of logic flaws in the mobility

01:11:18.540 --> 01:11:24.300
 plan survey where it asks when you bike you know there are a few questions about when

01:11:24.300 --> 01:11:29.300
 you bike so there's no opportunity if you don't bike to respond or say NA or something

01:11:29.300 --> 01:11:35.700
 and similarly there's a section on how you feel about your children going to school and

01:11:35.700 --> 01:11:42.180
 not everyone has children going to school so you need a logic path for that other comments

01:11:42.180 --> 01:11:47.740
 or questions just a question so I see that there's the survey and then there's the map

01:11:47.740 --> 01:11:53.420
 but is there within the survey a section just to leave another comment yes at the end and

01:11:53.420 --> 01:12:01.300
 a lot of those questions were kind of general we definitely put an option to type in additional

01:12:01.300 --> 01:12:05.500
 feedback so there's definitely several questions at the end of the survey that provide just

01:12:05.500 --> 01:12:12.340
 general questions it's just a comment just the safety and crash data was very informative

01:12:12.340 --> 01:12:21.540
 which adds to the reason why vision zero would be a really great thing for us to do so I

01:12:21.540 --> 01:12:28.580
 do want to add we are having a meeting next week as part of the mobility plan it's on

01:12:28.580 --> 01:12:36.140
 August 22nd 22nd it's at the student ministry center at Argyle United Methodist Church from

01:12:36.140 --> 01:12:41.220
 six to seven thirty and that's related to the Hickory Creek alignment where we had a

01:12:41.220 --> 01:12:47.100
 lot of citizen feedback and input about the alignment so we're going to meet them out

01:12:47.100 --> 01:12:53.500
 there look at different alignments we're going to have almost five or six alternatives receive

01:12:53.500 --> 01:12:57.900
 feedback which alignment is better and then we'll bring it as a council work session

01:12:57.900 --> 01:13:02.960
 item saying this is what we heard from the citizens this is what the alignments are pros

01:13:02.960 --> 01:13:09.260
 and cons and then recommendations great John can you send that time and date location out

01:13:09.260 --> 01:13:16.140
 to the committee yes we will if we can close that item I have a couple of items that I'd

01:13:16.140 --> 01:13:21.220
 like to see if they belong on the matrix or not but I'll take others first if you all

01:13:21.220 --> 01:13:29.340
 have matrix items I don't have matrix but I do have the construction report Forest Ridge

01:13:29.340 --> 01:13:33.140
 is not showing up on there the signs are out there right now saying that they're going

01:13:33.140 --> 01:13:40.940
 to start on the 19th but it's not on the street report on upcoming or existing projects I'll

01:13:40.940 --> 01:13:51.660
 check into that but that is definitely on the schedule okay my mind were still the conversation

01:13:51.660 --> 01:13:56.780
 on the taking back Elm and Locust and there was another question about why when is text

01:13:56.780 --> 01:14:00.540
 on or when the city going to redo them there's I guess some sections that are pretty bad

01:14:00.540 --> 01:14:06.660
 the pavement and my response was well I think they have to fix it before we take it back

01:14:06.660 --> 01:14:10.300
 and I don't know if that's correct or not and if there's a timeline on that but I did

01:14:10.300 --> 01:14:13.940
 notice it's still on the matrix and so I feel like that'll come back to us when we have

01:14:13.940 --> 01:14:20.060
 more information and then the crosswalks that the repainting of them when there's some schools

01:14:20.060 --> 01:14:23.980
 coming back in session I didn't know I saw that also on the matrix but I didn't know

01:14:23.980 --> 01:14:28.540
 another time so I was thinking so I think the first one Todd has an answer but with

01:14:28.540 --> 01:14:35.820
 the crosswalks one of the things that happened they were on schedule to be done for UNT campus

01:14:35.820 --> 01:14:40.700
 all the crosswalks around the campus as well as TWU and it includes the crosswalks that

01:14:40.700 --> 01:14:46.140
 are mentioned on the university at Bell and the other two locations with the DCT Quiet

01:14:46.140 --> 01:14:51.860
 Zone coming online and we felt that that was an important issue to address immediately

01:14:51.860 --> 01:14:57.460
 so we had to kind of move resources around but the sidewalk the crosswalks are still

01:14:57.460 --> 01:15:02.340
 on the plan and I think we've pushed that for a week or a couple weeks but we're getting

01:15:02.340 --> 01:15:11.620
 time on that definitely and Todd has a better answer with the turn back so oh sorry go ahead

01:15:11.620 --> 01:15:16.960
 we're currently in discussion with text out on the finalization of the MOU that would

01:15:16.960 --> 01:15:21.300
 involve all the turn back items and Elvin Locust is one piece of that but it's actually

01:15:21.300 --> 01:15:31.700
 all of 77 from I-35E north to 35 then it also includes FM 1515 pieces of 428 all those are

01:15:31.700 --> 01:15:37.180
 coming together we're doing the utility relocations right now on south Elmin Locust that has to

01:15:37.180 --> 01:15:42.100
 be done before we get any of the roadway work done and then we're finishing up plans for

01:15:42.100 --> 01:15:47.900
 all the north pieces of Elmin Locust up to University Drive for the utility relocations

01:15:47.900 --> 01:15:52.540
 we'll do the same thing we'll get ahead of text out they're just simply waiting on us

01:15:52.540 --> 01:15:58.340
 to get all the utilities moved and there are a lot of them in that right away water wastewater

01:15:58.340 --> 01:16:03.820
 storm water as soon as those are shifted and moved which is part of the pack four project

01:16:03.820 --> 01:16:08.860
 and then we have a subsequent one coming this coming year that'll go to construction then

01:16:08.860 --> 01:16:13.420
 text I can pave and they'll most likely start with Locust and go north all the way up to

01:16:13.420 --> 01:16:19.140
 University Drive from Eagle and then turn around and come down Elm and do it at that

01:16:19.140 --> 01:16:25.500
 time so we're gonna be tearing up the roadway places where there are bad spots currently

01:16:25.500 --> 01:16:31.680
 big potholes and such we'll temporarily patch them cover those until such time that takes

01:16:31.680 --> 01:16:38.860
 that redo redos the whole road thanks so we're in double overtime I'll just briefly say I'd

01:16:38.860 --> 01:16:48.300
 like to have a discussion in a future meeting just about the what happened regarding the

01:16:48.300 --> 01:16:57.540
 McKenna Park area with the roundabout with the trees with the house just you know I sit

01:16:57.540 --> 01:17:03.980
 on Committee on the Environment with this you know same group and well yeah and you

01:17:03.980 --> 01:17:07.700
 know I've seen the reports but I just would like to have a conversation about it and then

01:17:07.700 --> 01:17:15.140
 the other one is I don't know where it falls kind of seems to maybe fall between two stools

01:17:15.140 --> 01:17:22.100
 but I'd like to know whether there's an opportunity to look at adding to the rail trail signs

01:17:22.100 --> 01:17:26.880
 that you know there's a couple of pedestals that don't have signs on them deliberately

01:17:26.880 --> 01:17:31.740
 so so that we could add and I wonder you know where we might generate ideas for additional

01:17:31.740 --> 01:17:37.140
 ones and also there's a correction that needs to be made to one I say that as the person

01:17:37.140 --> 01:17:42.700
 who wrote them and I will personally pay for that one one sign that needs to be changed

01:17:42.700 --> 01:17:51.700
 where someone was left off of the women's interracial fellowship marker we're like now

01:17:51.700 --> 01:17:57.140
 in triple of overtime but go ahead can I just ask for staff's clarification when you're

01:17:57.140 --> 01:18:03.300
 wanting a conversation about trees for the location of the body brace scripture intersection

01:18:03.300 --> 01:18:09.480
 trees well can I get clarification just so that we know better what it is you're exactly

01:18:09.480 --> 01:18:13.940
 asked for what are you wanting there because well what's our procedure right because you

01:18:13.940 --> 01:18:19.580
 know I know that okay so forgive me for taking a little time to have a bit of the conversation

01:18:19.580 --> 01:18:29.580
 but I you know we made took special pains and committee on the environment to say that

01:18:29.580 --> 01:18:34.900
 the tree ordinance would apply to to the city as well but then there you know it doesn't

01:18:34.900 --> 01:18:40.460
 seem that there was a procedure that required us to do a tree survey in that area right

01:18:40.460 --> 01:18:44.740
 and then you know the outcome is different than I would have expected but also our knowledge

01:18:44.740 --> 01:18:51.940
 of you know the pre and of the preconditions in that area we didn't seem to have it so

01:18:51.940 --> 01:18:57.620
 so what is our process was it different than what it should be should it be changed also

01:18:57.620 --> 01:19:03.260
 what is the actual you know yeah just in kind of what was the sequence of events and so

01:19:03.260 --> 01:19:08.100
 to be clear you're wanting to know the sequence of events that led to that intersection and

01:19:08.100 --> 01:19:15.980
 then what we do to the removal of the trees and to end and and without plants without

01:19:15.980 --> 01:19:20.580
 knowing what trees without a survey the trees that are there or plan to mitigate as far

01:19:20.580 --> 01:19:24.580
 as I know maybe there is but you know I don't have visibility into all that so there is

01:19:24.580 --> 01:19:31.140
 a landscape plan coming that replaces I'm aware that and and takes care of those issues

01:19:31.140 --> 01:19:36.820
 the original alignment of Bonnie Bray I just were like I get that I truly want to have

01:19:36.820 --> 01:19:41.300
 this to hear your reply and that's fine we can do that I just need to know exactly what

01:19:41.300 --> 01:19:46.400
 it is we're addressing yeah I think you're you know you already have the information

01:19:46.400 --> 01:19:50.580
 you know I don't hope I'm not asking for anything you know new to go create but just want to

01:19:50.580 --> 01:19:56.660
 have the conversation okay add mobility or an indifferent venue I think I think it belongs

01:19:56.660 --> 01:20:18.660
 to me yeah okay okay thanks okay so entertain a motion to adjourn well then I bloody adjourn