1 00:00:00,000 --> 00:00:06,120 Welcome to the City of Denton's Planning and Zoning Commission meeting for Wednesday, 2 00:00:06,120 --> 00:00:08,500 June 12, 2024. 3 00:00:08,500 --> 00:00:10,480 This is our work session with a quorum present. 4 00:00:10,480 --> 00:00:15,440 I'll call us to order at 5.01 p.m. 5 00:00:15,440 --> 00:00:19,520 And our first item on agenda is citizen comments on consent agenda items. 6 00:00:19,520 --> 00:00:21,920 I do not see anyone here for that. 7 00:00:21,920 --> 00:00:26,800 So we'll move along to clarification of our agenda for this evening. 8 00:00:26,800 --> 00:00:30,160 The first item being our minutes from the 29th. 9 00:00:30,160 --> 00:00:33,360 Any questions, concerns on those? 10 00:00:33,360 --> 00:00:34,360 Okay. 11 00:00:34,360 --> 00:00:35,920 How about the consent agenda? 12 00:00:35,920 --> 00:00:39,680 We've got one plat on that. 13 00:00:39,680 --> 00:00:41,640 Okay. 14 00:00:41,640 --> 00:00:43,960 Items for individual consideration. 15 00:00:43,960 --> 00:00:48,680 There was an email that came through 4A, which was recommended for denial, is now recommended 16 00:00:48,680 --> 00:00:54,000 for approval, which Angie is going to tell us right now. 17 00:00:54,000 --> 00:01:04,400 This is a final plat for Stella Hills phase one. 18 00:01:04,400 --> 00:01:11,260 It is approximately 177 single family lots and four open space lots. 19 00:01:11,260 --> 00:01:14,080 This was recommended for denial in your packet. 20 00:01:14,080 --> 00:01:16,560 They have since met all of our criteria for approval. 21 00:01:16,560 --> 00:01:23,240 We are now comfortable with recommending approval of this final plat, lot 26X, which was originally 22 00:01:23,240 --> 00:01:27,960 slated to possibly be dedicated to the city via a development agreement. 23 00:01:27,960 --> 00:01:31,360 They went ahead and made that an open space lot with the understanding that parks would 24 00:01:31,360 --> 00:01:34,800 come back and acquire the trail they need through a separate easement. 25 00:01:34,800 --> 00:01:37,120 So they've satisfied all of our comments. 26 00:01:37,120 --> 00:01:38,120 Great. 27 00:01:38,120 --> 00:01:39,720 Any questions for Angie? 28 00:01:39,720 --> 00:01:40,720 Okay. 29 00:01:40,720 --> 00:01:41,720 Thank you very much. 30 00:01:41,720 --> 00:01:45,360 4B is FP 240020. 31 00:01:45,360 --> 00:01:47,800 I think Bryce is here to give us that summary. 32 00:01:47,800 --> 00:01:48,800 Hi. 33 00:01:48,800 --> 00:01:49,800 Good evening, commission. 34 00:01:49,800 --> 00:01:51,920 Bryce Farnarsdale, assistant planner. 35 00:01:51,920 --> 00:01:54,640 This is FP 240020. 36 00:01:54,640 --> 00:01:59,960 It is a final plat of approximately 15.98 acres, which will create a single lot in the 37 00:01:59,960 --> 00:02:01,720 city's ETJ division one. 38 00:02:01,720 --> 00:02:06,360 It is on the southeast corner of Copper Canyon Road and Old Alton Road. 39 00:02:06,360 --> 00:02:10,040 While they do not currently meet our criteria for approval, staff has no objections to the 40 00:02:10,040 --> 00:02:14,760 requests for their extension to a date certain of June 26th, 2024. 41 00:02:14,760 --> 00:02:17,640 I'll stand for any questions. 42 00:02:17,640 --> 00:02:18,640 Questions? 43 00:02:18,640 --> 00:02:21,640 Commissioner Villarreal. 44 00:02:21,640 --> 00:02:23,400 Which extension number is this for them? 45 00:02:23,400 --> 00:02:24,400 The first extension. 46 00:02:24,400 --> 00:02:25,400 Thank you. 47 00:02:25,400 --> 00:02:26,400 Yeah. 48 00:02:26,400 --> 00:02:27,400 Anything else? 49 00:02:27,400 --> 00:02:28,400 Okay. 50 00:02:28,400 --> 00:02:29,400 Thanks, Bryce. 51 00:02:29,400 --> 00:02:30,400 Thank you. 52 00:02:30,400 --> 00:02:39,000 Commissioner Cole is recusing the next four items, C through F. And Cameron is here to 53 00:02:39,000 --> 00:02:40,000 tell us about those. 54 00:02:40,000 --> 00:02:41,000 Hi. 55 00:02:41,000 --> 00:02:42,000 Good evening, commission. 56 00:02:42,000 --> 00:02:44,720 Cameron Robertson, principal planner. 57 00:02:44,720 --> 00:02:48,760 The first final plat you all, that is in front of you all this evening, is Hunter Ranch phase 58 00:02:48,760 --> 00:02:49,760 1A. 59 00:02:49,760 --> 00:02:55,840 It is approximately a 53-acre site, located north of Robson Ranch, just west of Interstate 60 00:02:55,840 --> 00:02:56,840 35 West. 61 00:02:56,840 --> 00:03:02,640 It is going to consist of 95 single-family residential lots and 10 HOA lots. 62 00:03:02,640 --> 00:03:07,280 At this time, staff is recommending denial of the final plat, as it does not meet our 63 00:03:07,280 --> 00:03:08,280 criteria for approval. 64 00:03:08,280 --> 00:03:12,560 But staff has no objection to the second extension to a date certain of June 26th, and I can 65 00:03:12,560 --> 00:03:13,560 stand for any questions. 66 00:03:13,560 --> 00:03:14,560 Thanks. 67 00:03:14,560 --> 00:03:18,000 Are we still waiting on the same thing we've been waiting on? 68 00:03:18,000 --> 00:03:19,000 Yeah. 69 00:03:19,000 --> 00:03:20,000 Okay. 70 00:03:20,000 --> 00:03:25,400 You've got the floor for the next, I'll just let you continue for the next three. 71 00:03:25,400 --> 00:03:26,400 Sounds good. 72 00:03:26,400 --> 00:03:27,960 This is for Hunter Ranch phase 1B. 73 00:03:27,960 --> 00:03:31,080 It's approximately a 53-acre site as well. 74 00:03:31,080 --> 00:03:36,060 It would consist of 180 single-family residential lots and eight HOA lots. 75 00:03:36,060 --> 00:03:40,200 At this time, staff is recommending denial, as it does not meet our criteria for approval. 76 00:03:40,200 --> 00:03:43,920 But staff has no objection to the second extension request to June 26th. 77 00:03:43,920 --> 00:03:45,400 Questions there? 78 00:03:45,400 --> 00:03:46,400 Okay. 79 00:03:46,400 --> 00:03:51,320 Go ahead to the E. 80 00:03:51,320 --> 00:03:54,720 So this is for Hunter Ranch phase 1C. 81 00:03:54,720 --> 00:03:58,480 It's approximately a 68-acre site. 82 00:03:58,480 --> 00:04:04,160 It would consist of 287 single-family residential lots and 10 HOA lots. 83 00:04:04,160 --> 00:04:09,320 Staff recommends denial at this time, as it does not meet our criteria for approval. 84 00:04:09,320 --> 00:04:17,120 But staff has no objection to the second extension to a date certain of June 26th. 85 00:04:17,120 --> 00:04:18,240 Questions? 86 00:04:18,240 --> 00:04:19,240 Thank you very much. 87 00:04:19,240 --> 00:04:22,560 I think I have one more. 88 00:04:22,560 --> 00:04:23,560 I think yes, you do. 89 00:04:23,560 --> 00:04:24,560 You have that. 90 00:04:24,560 --> 00:04:25,560 I'm sorry. 91 00:04:25,560 --> 00:04:26,560 You sure do. 92 00:04:26,560 --> 00:04:28,400 It was on the next page. 93 00:04:28,400 --> 00:04:31,640 This is for the Hunter Ranch phase 1D final plot. 94 00:04:31,640 --> 00:04:34,800 It is approximately a 56-acre site. 95 00:04:34,800 --> 00:04:39,780 It's for 185 single-family residential lots and 8 HOA lots. 96 00:04:39,780 --> 00:04:43,680 Staff is recommending denial at this time, but we have no objection to the second extension 97 00:04:43,680 --> 00:04:46,220 request to a date certain of June 26th. 98 00:04:46,220 --> 00:04:47,220 Okay. 99 00:04:47,220 --> 00:04:48,220 No questions. 100 00:04:48,220 --> 00:04:52,240 Thank you very much for that. 101 00:04:52,240 --> 00:04:53,920 Let's bring Commissioner Cole back in. 102 00:04:53,920 --> 00:04:54,920 Thanks, Jordan. 103 00:04:54,920 --> 00:05:03,080 And we will go into our public hearings for today. 104 00:05:03,080 --> 00:05:07,720 First is 5A PD 240005. 105 00:05:07,720 --> 00:05:13,520 There is some material on your desk, and Mia is going to let us know what's happening. 106 00:05:13,520 --> 00:05:14,520 Hi. 107 00:05:14,520 --> 00:05:15,520 Hello. 108 00:05:15,520 --> 00:05:16,520 Good evening, Chair. 109 00:05:16,520 --> 00:05:19,520 Should I wait a little second? 110 00:05:19,520 --> 00:05:22,440 We should probably wait for one second. 111 00:05:22,440 --> 00:05:25,760 He's further away than we thought. 112 00:05:25,760 --> 00:05:26,760 There we go. 113 00:05:26,760 --> 00:05:27,760 Thank you. 114 00:05:27,760 --> 00:05:30,320 Good evening, Chair, members of the Commission. 115 00:05:30,320 --> 00:05:39,920 So this item, PD 240005, is a request to rezone approximately 53 acres, or 52 and a half acres, 116 00:05:39,920 --> 00:05:41,680 from R62 PDLI. 117 00:05:41,680 --> 00:05:45,200 That's an overlay within Light Industrial Base Zoning. 118 00:05:45,200 --> 00:05:51,240 The property is located just north of Black Road, approximately 800 feet east of Giesling 119 00:05:51,240 --> 00:05:56,240 Road, and it's part of a larger, approximately 86-acre tract. 120 00:05:56,240 --> 00:06:03,200 The PD request would establish a Light Industrial Zoning, whereas it is R6 today, but also establish 121 00:06:03,200 --> 00:06:09,380 some additional conditions, specifically require ESA compliance at ZCP review. 122 00:06:09,380 --> 00:06:14,440 It also requires a 250-foot building setback from the existing residential properties, 123 00:06:14,440 --> 00:06:22,240 as well as Black Road, and then it also requires a 50-foot wide buffer with 50 buffer points 124 00:06:22,240 --> 00:06:25,760 adjacent to the residential properties, as well as Black Road. 125 00:06:25,760 --> 00:06:32,040 That is recommending approval, as the request does meet our criteria for approval, and since 126 00:06:32,040 --> 00:06:34,120 the packet went out, there were a few updates. 127 00:06:34,120 --> 00:06:39,520 One, I've already mentioned that the extension of the 250-foot building setback and the 50-foot 128 00:06:39,520 --> 00:06:45,160 wide landscape buffer is now adjacent to, or applied to, Black Road also, whereas I 129 00:06:45,160 --> 00:06:48,960 think in your backup, it was just shown to be adjacent to the residential properties. 130 00:06:48,960 --> 00:06:55,440 Additionally, we have also received two responses in opposition of the request, and another 131 00:06:55,440 --> 00:07:00,460 one update that I wanted to mention that's not on this slide is that they have added 132 00:07:00,460 --> 00:07:08,600 additional restrictions to Black Road's access that is limiting the ability for trucks to 133 00:07:08,600 --> 00:07:16,560 travel from any proposed driveway on Black Road, and then they have also added a prohibition 134 00:07:16,560 --> 00:07:24,120 against auto fuel cells and major automotive repair within this PD. 135 00:07:24,120 --> 00:07:28,280 So again, staff is recommending approval, and I have the more detailed presentation 136 00:07:28,280 --> 00:07:32,060 in prepared for the regular session, but at this time, I'll take any questions or comments 137 00:07:32,060 --> 00:07:33,060 you have. 138 00:07:33,060 --> 00:07:34,060 Sounds good. 139 00:07:34,060 --> 00:07:35,060 Commissioner Thacker. 140 00:07:35,060 --> 00:07:36,060 Thank you, Chair. 141 00:07:36,060 --> 00:07:42,600 What qualifies major auto repair? 142 00:07:42,600 --> 00:07:48,680 I can pull that definition up exactly, but I think when we get into, I don't know the 143 00:07:48,680 --> 00:07:52,720 distinguish, but I think minor is more the quick lubes, the oil change places, whereas 144 00:07:52,720 --> 00:07:56,600 major works on transmissions and stuff like that, but I could have the definition ready 145 00:07:56,600 --> 00:07:58,760 for you in the regular session if you'd like. 146 00:07:58,760 --> 00:08:03,400 I'm just trying to distinguish between like a parking lot of stagnant cars and cars kind 147 00:08:03,400 --> 00:08:10,360 of coming and going, and a garage shutting every night, you know what I'm saying? 148 00:08:10,360 --> 00:08:11,360 Gotcha. 149 00:08:11,360 --> 00:08:12,360 Yeah. 150 00:08:12,360 --> 00:08:13,360 Thank you. 151 00:08:13,360 --> 00:08:15,560 Any other questions at the moment? 152 00:08:15,560 --> 00:08:16,560 Commissioner Cole. 153 00:08:16,560 --> 00:08:17,560 Thank you, Chair. 154 00:08:17,560 --> 00:08:23,880 I don't know what Commissioner Thacker said, I'd like to know kind of the uses and what 155 00:08:23,880 --> 00:08:26,280 that definition is going to be. 156 00:08:26,280 --> 00:08:27,280 Yeah. 157 00:08:27,280 --> 00:08:28,280 Okay. 158 00:08:28,280 --> 00:08:32,960 Yeah, my thoughts were to honestly eliminate both of them when I had it on my notes, my 159 00:08:32,960 --> 00:08:39,040 personal notes that I can't find at the moment, that I will find. 160 00:08:39,040 --> 00:08:44,920 Yeah, I was hoping to not have an auto wash fuel sales major or minor. 161 00:08:44,920 --> 00:08:49,600 And the applicant will be here also. 162 00:08:49,600 --> 00:08:53,960 I do like that they added those, yeah, that's helpful. 163 00:08:53,960 --> 00:08:59,120 I'm trying to get my, you don't have this up, do you? 164 00:08:59,120 --> 00:09:01,920 I can, yes, I can. 165 00:09:01,920 --> 00:09:04,400 I'm trying to read the access verbiage. 166 00:09:04,400 --> 00:09:08,280 Oh, I do not, no, I do not have the verbiage up there. 167 00:09:08,280 --> 00:09:10,200 That change came much later in the day. 168 00:09:10,200 --> 00:09:11,640 Okay, are you planning to have it in this? 169 00:09:11,640 --> 00:09:12,640 Yes. 170 00:09:12,640 --> 00:09:13,640 Okay, okay, excellent. 171 00:09:13,640 --> 00:09:18,440 Okay, then I'll wrap my head around it between now and then and we can, if I end up with 172 00:09:18,440 --> 00:09:20,720 a question on it, I can ask it there. 173 00:09:20,720 --> 00:09:21,720 Okay. 174 00:09:21,720 --> 00:09:22,720 Yeah. 175 00:09:22,720 --> 00:09:23,720 Okay. 176 00:09:23,720 --> 00:09:24,720 Anybody else? 177 00:09:24,720 --> 00:09:25,720 Commissioner Villareal. 178 00:09:25,720 --> 00:09:26,720 Thank you, Chair. 179 00:09:26,720 --> 00:09:33,040 So I read it in the backup material that during the meeting with neighboring folks in the 180 00:09:33,040 --> 00:09:37,720 area, they mentioned they didn't have any pending development plans or proposed development 181 00:09:37,720 --> 00:09:43,080 plans, but they mentioned as well that they're hoping to put a warehouse here, but they're 182 00:09:43,080 --> 00:09:45,840 not precluded from putting something other than a warehouse. 183 00:09:45,840 --> 00:09:51,720 What was the last, I guess, what is our understanding of what they're planning on putting on this? 184 00:09:51,720 --> 00:09:54,340 So they truly do not know. 185 00:09:54,340 --> 00:09:57,920 The interest that the applicant has expressed that they've received has been leaning towards 186 00:09:57,920 --> 00:10:01,280 warehouse uses, but right now they do not know. 187 00:10:01,280 --> 00:10:08,720 Do you have, excuse me, just a second, do you have a picture where you've got outlined 188 00:10:08,720 --> 00:10:12,160 the parent tract in case people need reference for that? 189 00:10:12,160 --> 00:10:14,480 Yes, I can clarify that in the slides, yeah. 190 00:10:14,480 --> 00:10:20,680 Because there is several other pieces involved, I mean, with the same owner that possibly 191 00:10:20,680 --> 00:10:22,480 might develop everything as one. 192 00:10:22,480 --> 00:10:26,640 So it's not just this little thing that we're looking at today, but I just wanted to make 193 00:10:26,640 --> 00:10:28,640 sure you had that clarity as well. 194 00:10:28,640 --> 00:10:29,640 Okay. 195 00:10:29,640 --> 00:10:30,640 And yes, Tina, go ahead. 196 00:10:30,640 --> 00:10:31,640 Thank you. 197 00:10:31,640 --> 00:10:36,920 In the past, it's my understanding that this property had been considered for residential 198 00:10:36,920 --> 00:10:40,520 development, but because of some of the encumbrances that are associated with the property, particularly 199 00:10:40,520 --> 00:10:44,880 there's overhead transmission lines as well as a gas line, which you can see is evident 200 00:10:44,880 --> 00:10:50,720 on this aerial here, precluded it from being successfully laid out for residential purposes. 201 00:10:50,720 --> 00:10:55,240 So over time, when we updated the Denton 2040 comprehensive plan, we also made some revisions 202 00:10:55,240 --> 00:10:58,980 in this area to reflect the industrial designations. 203 00:10:58,980 --> 00:11:02,280 We've seen properties in this area a handful of times, at least in the time period that 204 00:11:02,280 --> 00:11:07,600 I've been here, where we've rezoned properties to light industrial from this property owner. 205 00:11:07,600 --> 00:11:11,080 There was at one point in time, I believe an Amazon distribution facility that was looking 206 00:11:11,080 --> 00:11:15,680 to occupy the west side of Gisling road, and then having some parking operations on the 207 00:11:15,680 --> 00:11:19,080 east side that did not come to fruition. 208 00:11:19,080 --> 00:11:23,840 And to Mia's point, there's been conversations with respect to warehouse development, obviously 209 00:11:23,840 --> 00:11:26,400 with the light industrial zoning district is the base zoning. 210 00:11:26,400 --> 00:11:30,680 You have to take into consideration all the uses that are allowed, but from what we're 211 00:11:30,680 --> 00:11:35,240 seeing in this area, it's typically in that format of warehouse distribution type uses. 212 00:11:35,240 --> 00:11:41,240 And so with the ownership that they have also here in the area, this is just one more parcel 213 00:11:41,240 --> 00:11:47,960 that allows them to be able to probably develop the larger ownership as either a single user 214 00:11:47,960 --> 00:11:51,000 or multiple buildings that are being constructed there. 215 00:11:51,000 --> 00:11:56,760 - And just following up on that, that staff perhaps discuss with them, since it is gonna 216 00:11:56,760 --> 00:12:00,720 be a PD restricting it to just warehouse uses, is that a conversation that came up with the 217 00:12:00,720 --> 00:12:02,160 applicant at all? 218 00:12:02,160 --> 00:12:08,720 - No, they wanted the flexibility since they are marketing it at this time to not, but 219 00:12:08,720 --> 00:12:13,080 they were okay with, like I said, limiting certain uses like the auto fuel cells and 220 00:12:13,080 --> 00:12:15,040 the major auto repair there. 221 00:12:15,040 --> 00:12:16,680 - Got it, thank you. 222 00:12:16,680 --> 00:12:20,600 - And I guess just to correct, they're not proposing a restricted to just warehouse. 223 00:12:20,600 --> 00:12:23,640 So it would be all the uses that are allowed in the light industrial, okay, I just wanna 224 00:12:23,640 --> 00:12:24,640 make sure you understand. 225 00:12:24,640 --> 00:12:25,640 Okay, perfect. 226 00:12:25,640 --> 00:12:27,520 - Yeah, I think his question was, would they? 227 00:12:27,520 --> 00:12:29,320 - Would they be willing to? 228 00:12:29,320 --> 00:12:30,320 - Oh, yeah. 229 00:12:30,320 --> 00:12:35,800 Okay, and you said the applicant will be here anyway to have further discussion about neighborhood 230 00:12:35,800 --> 00:12:37,240 meetings and whatnot. 231 00:12:37,240 --> 00:12:38,240 - Correct. 232 00:12:38,240 --> 00:12:40,720 - Okay, anything else at the moment for Mia? 233 00:12:40,720 --> 00:12:41,720 - No. 234 00:12:41,720 --> 00:12:44,720 - Okay, thank you very much. 235 00:12:44,720 --> 00:12:52,080 So our next to 5B and C, you probably saw that email come through where that item is 236 00:12:52,080 --> 00:12:56,960 being requested to be postponed until July 24th. 237 00:12:56,960 --> 00:13:01,440 Angie, I'll just let you give that formal. 238 00:13:01,440 --> 00:13:06,760 - Yeah, thank you, Chair, members of the commission, Angie Manglars, Development Review Manager. 239 00:13:06,760 --> 00:13:11,800 Yes, as stated, some infrastructure challenges have come to light that we do need to work 240 00:13:11,800 --> 00:13:14,080 through. 241 00:13:14,080 --> 00:13:19,240 Staff as well as the applicant are requesting to postpone this case to a date certain of 242 00:13:19,240 --> 00:13:21,240 July 24th, 2024. 243 00:13:21,240 --> 00:13:29,800 I say this case, but I mean both Z220018, as well as PD230001. 244 00:13:29,800 --> 00:13:33,720 - And from my understanding is we're going to open the public hearing, right? 245 00:13:33,720 --> 00:13:37,520 Leave it open and then continue to that date certain, correct? 246 00:13:37,520 --> 00:13:39,040 - Yes, ma'am. 247 00:13:39,040 --> 00:13:40,040 - Okay. 248 00:13:40,040 --> 00:13:42,400 Go ahead, Commissioner Villarreal. 249 00:13:42,400 --> 00:13:43,400 - Thank you, Chair. 250 00:13:43,400 --> 00:13:44,480 Just a quick question on process. 251 00:13:44,480 --> 00:13:49,080 The folks who reached out via email about these two projects, were we able to email 252 00:13:49,080 --> 00:13:52,840 them letting them know it was going to be postponed to a date certain? 253 00:13:52,840 --> 00:13:53,840 - Sure. 254 00:13:53,840 --> 00:13:58,720 So I did not go back and respond to each and every individual email I got, but I was in 255 00:13:58,720 --> 00:14:03,960 contact with several very plugged-in neighbors and did let them know this morning of the 256 00:14:03,960 --> 00:14:08,000 request and told them to feel free to forward and share with whoever they felt possible. 257 00:14:08,000 --> 00:14:11,080 I also received probably about five or six phone calls throughout the course of the day 258 00:14:11,080 --> 00:14:15,320 from other people just asking to confirm that, so I do feel like word was gotten out. 259 00:14:15,320 --> 00:14:18,800 I did also make it clear that individuals could still come if they wished, but that 260 00:14:18,800 --> 00:14:19,800 was going to be the request. 261 00:14:19,800 --> 00:14:20,800 - Got it. 262 00:14:20,800 --> 00:14:21,800 Thank you. 263 00:14:21,800 --> 00:14:22,800 - Yes. 264 00:14:22,800 --> 00:14:23,800 - Yes. 265 00:14:23,800 --> 00:14:26,720 And I did as well reach out to anyone who had emailed regarding that to let them know 266 00:14:26,720 --> 00:14:28,520 of that plan as well. 267 00:14:28,520 --> 00:14:29,520 Okay. 268 00:14:29,520 --> 00:14:30,520 Okay. 269 00:14:30,520 --> 00:14:47,000 Let's go to, let's see, 5D, S240003, which goes in tandem with D, I'm sorry, E as well. 270 00:14:47,000 --> 00:14:51,920 Good evening, Chair, members of the commission. 271 00:14:51,920 --> 00:14:57,800 So this is S240003 and S240004 for advanced microbial solutions, and these are similar 272 00:14:57,800 --> 00:15:03,960 applications from the same applicant, so I will be presenting them together. 273 00:15:03,960 --> 00:15:07,780 In summary, this is a request for a specific use permit for a high-impact manufacturing 274 00:15:07,780 --> 00:15:10,280 use on approximately eight acres of land. 275 00:15:10,280 --> 00:15:15,080 The eight acres is outlined on the screen in red, that's S240003, and then an additional 276 00:15:15,080 --> 00:15:20,680 9.5 acres of land, which is S240004, and outlined on your screen in blue. 277 00:15:20,680 --> 00:15:24,160 These sites are generally located on the southwest corner of the intersection of Shelby Lane 278 00:15:24,160 --> 00:15:29,080 and Dakota Lane, and on the west side of Dakota Lane, 800 feet south of Shelby Lane. 279 00:15:29,080 --> 00:15:33,000 The existing zoning is heavy industrial, which is shown on the maps on the left, and the 280 00:15:33,000 --> 00:15:36,560 future land use is industrial commerce, shown on the maps on the right. 281 00:15:36,560 --> 00:15:40,340 And staff does recommend approval as it complies with the criteria for approval, and I'm happy 282 00:15:40,340 --> 00:15:44,240 to answer any questions. 283 00:15:44,240 --> 00:15:45,240 Can you enlighten me? 284 00:15:45,240 --> 00:15:48,040 I think you had a talk with the fire chief yesterday, right? 285 00:15:48,040 --> 00:15:51,800 We have been discussing this with fire and building safety. 286 00:15:51,800 --> 00:15:55,840 They both have a table in their codes about maximum amounts of chemicals, so we were trying 287 00:15:55,840 --> 00:16:00,240 to work through some of that with them, and we did work through that with building safety. 288 00:16:00,240 --> 00:16:05,560 So they will, if the SUP is approved, they will submit with their CO all of the chemicals 289 00:16:05,560 --> 00:16:09,600 that they're storing to building safety, and building safety will approve that. 290 00:16:09,600 --> 00:16:13,920 And they'll also submit that to fire for their hazardous materials permits, and fire will 291 00:16:13,920 --> 00:16:14,920 review that. 292 00:16:14,920 --> 00:16:18,160 And that's where they would also review any needed secondary containment that was not 293 00:16:18,160 --> 00:16:21,640 already there, anything like that. 294 00:16:21,640 --> 00:16:25,160 Thank you. 295 00:16:25,160 --> 00:16:31,920 On that note, the backup material talked about requiring additional permitting that you described 296 00:16:31,920 --> 00:16:35,380 if additional types of chemicals would be stored in the future. 297 00:16:35,380 --> 00:16:46,320 Is there any vehicle for those permits having a cap of the amount as far as, you know, hazardous 298 00:16:46,320 --> 00:16:51,920 materials, once you get over a certain amount of the fire safety becomes a different question, 299 00:16:51,920 --> 00:16:54,100 or is it really just the type of material? 300 00:16:54,100 --> 00:16:58,040 So the way that the table is written, there's each type of chemical and then what type of 301 00:16:58,040 --> 00:17:02,120 that kind of chemical it is, and then they have a certain maximum amount they can have 302 00:17:02,120 --> 00:17:05,520 per their control area, so if they have more than that amount per their control area, they 303 00:17:05,520 --> 00:17:07,200 need to create a new control area. 304 00:17:07,200 --> 00:17:09,400 Okay, and then that would require a new permit? 305 00:17:09,400 --> 00:17:10,400 Yes. 306 00:17:10,400 --> 00:17:11,400 Got it. 307 00:17:11,400 --> 00:17:12,400 Thank you. 308 00:17:12,400 --> 00:17:13,400 Anything else? 309 00:17:13,400 --> 00:17:16,400 Thank you very much. 310 00:17:16,400 --> 00:17:18,200 Thank you. 311 00:17:18,200 --> 00:17:30,080 Let's see, okay, and then we've got final public hearing, and that's item F, DCA 240003. 312 00:17:30,080 --> 00:17:39,760 Hello, Angie Manglars, Development Review Manager. 313 00:17:39,760 --> 00:17:43,200 This is DCA 240003. 314 00:17:43,200 --> 00:17:46,560 This is amendment to the Denton Development Code as it relates to conflicts with other 315 00:17:46,560 --> 00:17:49,400 ordinances and criteria manuals. 316 00:17:49,400 --> 00:17:55,400 So the purpose of this code amendment is to update the DDC subsection 1.3.4 as it relates 317 00:17:55,400 --> 00:17:58,640 to conflicts with other ordinances and criteria manuals. 318 00:17:58,640 --> 00:18:04,840 Specifically, this code amendment is to address the recent adoption of the Denton Design Criteria 319 00:18:04,840 --> 00:18:11,920 Manual, which was adopted by City Council on June 4th, and removing potential conflicts. 320 00:18:11,920 --> 00:18:17,080 The Denton Design Criteria Manual specifies that in the event of a conflict, the DDC shall 321 00:18:17,080 --> 00:18:18,080 control. 322 00:18:18,080 --> 00:18:22,560 As it is today, the DDC says that in the event of a conflict, the Criteria Manual shall control. 323 00:18:22,560 --> 00:18:26,280 So we are going to make sure that those are consistent, so it's not creating any conflicts. 324 00:18:26,280 --> 00:18:31,320 Removing a potential conflict, it's needed to help clarify the Denton Development Code 325 00:18:31,320 --> 00:18:36,800 and who shall govern, as well as we made some name updates to make sure we were referring 326 00:18:36,800 --> 00:18:41,200 to all the right manuals and removing those that we no longer use. 327 00:18:41,200 --> 00:18:45,240 And so for those reasons, we are recommending approval of the code amendments tonight. 328 00:18:45,240 --> 00:18:48,560 I'm happy to talk through any more if you need that. 329 00:18:48,560 --> 00:18:50,560 Any questions? 330 00:18:50,560 --> 00:18:53,520 No, it was presented perfectly in the backup, yes. 331 00:18:53,520 --> 00:18:54,520 Great. 332 00:18:54,520 --> 00:18:55,520 Exactly what we're looking at. 333 00:18:55,520 --> 00:18:56,520 Okay. 334 00:18:56,520 --> 00:18:57,520 Awesome. 335 00:18:57,520 --> 00:18:58,520 Thank you very much, Angie. 336 00:18:58,520 --> 00:18:59,520 Okay. 337 00:18:59,520 --> 00:19:00,520 That is it for our agenda tonight. 338 00:19:00,520 --> 00:19:03,280 We've got two work session reports. 339 00:19:03,280 --> 00:19:07,280 First one being 3A, PZ24089. 340 00:19:07,280 --> 00:19:10,360 That's receive a report, hold a discussion related to amending the Denton Development 341 00:19:10,360 --> 00:19:14,400 Code to establish community engagement agreement participation process. 342 00:19:14,400 --> 00:19:15,400 Hello. 343 00:19:15,400 --> 00:19:18,120 Nice to see you, Chair Ellis, if I could. 344 00:19:18,120 --> 00:19:21,640 So I know some of you had the opportunity to meet Keisha at a previous meeting where 345 00:19:21,640 --> 00:19:25,800 we introduced her at the end of the meeting, but I'm happy to have her join our team because 346 00:19:25,800 --> 00:19:29,560 she's been with us month and a half, two months, almost two months. 347 00:19:29,560 --> 00:19:35,320 So Keisha has nearly 20 years of experience working in local government in a variety of 348 00:19:35,320 --> 00:19:36,320 capacities. 349 00:19:36,320 --> 00:19:39,760 Her most recent employment was with the city of Plano, where she was over their neighborhood 350 00:19:39,760 --> 00:19:42,840 engagement team, as well as some of their housing programs. 351 00:19:42,840 --> 00:19:46,840 And so she has an extensive amount of experience when it comes to public engagement. 352 00:19:46,840 --> 00:19:51,080 So we're excited to tap into her skills and resources that we can employ those here in 353 00:19:51,080 --> 00:19:52,080 Denton. 354 00:19:52,080 --> 00:19:53,080 But she's been a great addition so far. 355 00:19:53,080 --> 00:19:54,680 So I'm going to turn it over to her. 356 00:19:54,680 --> 00:19:55,680 Thank you. 357 00:19:55,680 --> 00:19:56,680 Hi, Keisha. 358 00:19:56,680 --> 00:19:57,680 Good evening, Chair and Commissioner. 359 00:19:57,680 --> 00:20:02,560 I'm Keisha Siriano, Assistant Planning Director, here to speak with you tonight about the possibility 360 00:20:02,560 --> 00:20:07,840 of adding community engagement agreement incentives as an opportunity for our developers to increase 361 00:20:07,840 --> 00:20:09,640 their public engagement. 362 00:20:09,640 --> 00:20:14,800 We understand that City Council, Planning and Zoning Commission, as well as staff, like 363 00:20:14,800 --> 00:20:18,800 to see developers to interact and engage with the community. 364 00:20:18,800 --> 00:20:23,960 So this is an option that we want to present to you today and get your thoughts on. 365 00:20:23,960 --> 00:20:29,640 So the current code does recommend citizen participation, but it's a recommendation, 366 00:20:29,640 --> 00:20:31,640 so it's optional. 367 00:20:31,640 --> 00:20:37,800 There is a citizen participation plan noted in there, as well as a participation report. 368 00:20:37,800 --> 00:20:44,360 The staff provides mailing addresses for those developers who would like to have neighborhood 369 00:20:44,360 --> 00:20:45,360 meetings. 370 00:20:45,360 --> 00:20:49,680 The staff does attend those when they're available, but in the last five years, what we found 371 00:20:49,680 --> 00:20:56,400 is we haven't had anyone submit a citizen participation report or a plan. 372 00:20:56,400 --> 00:21:02,880 So we thought, what can we do to possibly entice our development community to have more 373 00:21:02,880 --> 00:21:08,120 engagement with the community, which brings us to our why. 374 00:21:08,120 --> 00:21:13,560 So this is a staff-initiated amendment, again, just wanting to increase engagement between 375 00:21:13,560 --> 00:21:15,920 developers and residents as well. 376 00:21:15,920 --> 00:21:19,840 And we know neighborhood engagement is important, and as I mentioned, it's very important to 377 00:21:19,840 --> 00:21:23,520 our decision-making bodies, as well as staff. 378 00:21:23,520 --> 00:21:28,200 And when developers have the opportunity to speak with residents up front, that kind of 379 00:21:28,200 --> 00:21:32,460 minimizes some of the issues that may come up during a public hearing. 380 00:21:32,460 --> 00:21:36,240 They can hear the concerns that community may have and be able to work some of those 381 00:21:36,240 --> 00:21:43,400 things out beforehand and hopefully minimize any delays they may have with their projects. 382 00:21:43,400 --> 00:21:48,640 So how do we incentivize our applicants to engage with the community? 383 00:21:48,640 --> 00:21:52,580 That's a question we're going to discuss tonight. 384 00:21:52,580 --> 00:21:59,520 So we are considering to offer incentives for developers that move into creating, establishing 385 00:21:59,520 --> 00:22:02,940 a community engagement agreement with neighborhood representatives. 386 00:22:02,940 --> 00:22:09,480 So a community engagement agreement is a document between an applicant, so it'll be with a developer, 387 00:22:09,480 --> 00:22:14,760 an applicant and neighborhoods, and they will work together to try to figure out what does 388 00:22:14,760 --> 00:22:20,640 the neighborhood want and what could the developer possibly provide, whether it's on-site or 389 00:22:20,640 --> 00:22:26,560 off-site, and then in exchange for the developer, the applicant saying, "We'll take care of 390 00:22:26,560 --> 00:22:31,480 these things you're in need of," residents will say, "We'll give their support on your 391 00:22:31,480 --> 00:22:32,480 project." 392 00:22:32,480 --> 00:22:39,480 So here's just a list of examples of some things that they may could discuss such as 393 00:22:39,480 --> 00:22:45,760 providing job training classes, employment opportunities, affordable housing units, providing 394 00:22:45,760 --> 00:22:51,680 open space within their site that the public could use, doing some screening and buffering 395 00:22:51,680 --> 00:22:57,000 adjacent to the neighborhood, architectural designs, a number of different things that 396 00:22:57,000 --> 00:23:02,680 the neighborhood could negotiate with the applicant to provide in exchange for them 397 00:23:02,680 --> 00:23:04,880 supporting their project. 398 00:23:04,880 --> 00:23:07,120 Here's just a couple of local examples. 399 00:23:07,120 --> 00:23:10,960 You all may remember I wasn't here, but some of you may have been here when there was a 400 00:23:10,960 --> 00:23:13,000 380 multifamily project. 401 00:23:13,000 --> 00:23:19,680 The applicant did submit a memorandum of understanding with the neighborhood, the neighborhood was 402 00:23:19,680 --> 00:23:25,840 requesting more architectural design to do more farmhouse design, and in exchange, they 403 00:23:25,840 --> 00:23:27,920 did do that to developer. 404 00:23:27,920 --> 00:23:31,960 They did come to agreement to be able to do those things, and then you also may also remember 405 00:23:31,960 --> 00:23:37,760 the Woodrow multifamily project where they offered the community scholarships in support 406 00:23:37,760 --> 00:23:42,880 of their development. 407 00:23:42,880 --> 00:23:46,260 So this is just a starting list. 408 00:23:46,260 --> 00:23:50,220 There may be other incentives we may, if this gets approved later down the line when we 409 00:23:50,220 --> 00:23:56,680 come back, we may add more incentives, but just to start we were thinking that they could, 410 00:23:56,680 --> 00:24:03,680 if they submit an executed agreement between the neighborhood and the applicant concurrent 411 00:24:03,680 --> 00:24:09,520 submittal of zoning compliance plan as well as a civil engineering plan, and then also 412 00:24:09,520 --> 00:24:15,240 insure, excuse me, of the clearing grade permit after the final plan has been approved. 413 00:24:15,240 --> 00:24:20,800 So what were they, so the items that we have here that they will need in order for them 414 00:24:20,800 --> 00:24:26,080 to receive the incentives, they need to submit that executed agreement, and the agreement 415 00:24:26,080 --> 00:24:32,120 would be with 51%, we're going to require that they reach out to 51% of the property 416 00:24:32,120 --> 00:24:38,280 owners within 500 feet of the project site, and then we're going to also ask them to get 417 00:24:38,280 --> 00:24:44,440 unique signatures from 51% of property owners within the project site. 418 00:24:44,440 --> 00:24:51,840 If there is an HOA within the neighborhood, they can choose to have the HOA represent 419 00:24:51,840 --> 00:24:54,920 them when their negotiations with the applicant. 420 00:24:54,920 --> 00:24:58,760 Can I stop you there? 421 00:24:58,760 --> 00:25:05,400 I'm a little confused on the, like the neighborhood representative and who that would be and how 422 00:25:05,400 --> 00:25:09,040 you would vet signatures and whatnot. 423 00:25:09,040 --> 00:25:10,040 Can you help me there? 424 00:25:10,040 --> 00:25:13,760 I mean, especially if they're, like a neighborhood doesn't have an HOA, then there's not really 425 00:25:13,760 --> 00:25:19,880 a designated body running something in representation of the neighborhood. 426 00:25:19,880 --> 00:25:24,160 We haven't discussed that part, but I'd imagine those addresses that we would send out the 427 00:25:24,160 --> 00:25:28,840 notifications that we would still be responsible for helping the developer do that piece. 428 00:25:28,840 --> 00:25:32,680 And on that sign-in sheet where they will sign and say, "We agree to this project. 429 00:25:32,680 --> 00:25:36,160 We agree to the needs that we've negotiated." 430 00:25:36,160 --> 00:25:40,640 There would need to be, that's why I was saying, unique signature and address tied to those 431 00:25:40,640 --> 00:25:45,080 that list, that's what I'm thinking that'll do, I don't know if Tina has any other thoughts 432 00:25:45,080 --> 00:25:46,600 on how we would verify. 433 00:25:46,600 --> 00:25:51,880 Yes, just like we do on any zoning cases that you all receive, when we receive letters in 434 00:25:51,880 --> 00:25:56,600 opposition or in support, we look to see, okay, are they within the 200 foot notification 435 00:25:56,600 --> 00:26:00,160 that we do in addition to the 500 foot postcards that we send out. 436 00:26:00,160 --> 00:26:04,240 So this process really is no different than what we do on our zoning cases. 437 00:26:04,240 --> 00:26:08,880 The other thing I want to make mention is, and it's on the slide, but Tisha didn't mention 438 00:26:08,880 --> 00:26:13,520 in her words that this agreement option would be submitted concurrently only with zoning 439 00:26:13,520 --> 00:26:16,760 changes or specific use permit applications. 440 00:26:16,760 --> 00:26:22,800 Once properties are already entitled, there's no incentive for the developer to further 441 00:26:22,800 --> 00:26:25,300 meet because they already have their zoning entitlement rights. 442 00:26:25,300 --> 00:26:31,480 So we're trying to further strengthen our engagement process and help provide some incentive 443 00:26:31,480 --> 00:26:36,560 for the development community to be able to engage with those neighborhoods. 444 00:26:36,560 --> 00:26:40,440 And so we're limiting this to zoning change requests or specific use permits. 445 00:26:40,440 --> 00:26:44,000 So those zoning change requests are like plan development district requests that we get, 446 00:26:44,000 --> 00:26:48,920 straight zoning requests, PD overlays that sometimes come through, specific use permits. 447 00:26:48,920 --> 00:26:54,400 Those are all forms of a zoning action where the developer has to go through that entitlement 448 00:26:54,400 --> 00:27:00,400 process because they're ultimately trying to get to approval, right? 449 00:27:00,400 --> 00:27:03,640 And we'd always encourage them to engage with the neighborhoods. 450 00:27:03,640 --> 00:27:08,920 So we were like, okay, what could we do to help with incentivizing them to engage with 451 00:27:08,920 --> 00:27:11,040 those neighborhoods just a little bit more? 452 00:27:11,040 --> 00:27:15,720 And so the other thing we've decided to focus on those items where we can control that process 453 00:27:15,720 --> 00:27:16,720 in terms of those incentives. 454 00:27:16,720 --> 00:27:21,040 And that's why we've linked it to our zoning compliance plan being processed simultaneously 455 00:27:21,040 --> 00:27:22,560 with civil engineering plans. 456 00:27:22,560 --> 00:27:27,720 Our preference normally is that those are kept apart and someone does their zoning compliance 457 00:27:27,720 --> 00:27:28,720 plan first. 458 00:27:28,720 --> 00:27:33,600 And then once they get that step approved, then they come in with their civils. 459 00:27:33,600 --> 00:27:34,600 That's our preference. 460 00:27:34,600 --> 00:27:38,440 However, we find that if someone's going to go through the effort of truly engaging with 461 00:27:38,440 --> 00:27:43,720 the neighborhood and in helping come into a better design project and having agreement, 462 00:27:43,720 --> 00:27:48,080 then what can we do to be able to help on the development side of it to maybe gain a 463 00:27:48,080 --> 00:27:49,640 little bit of that time back. 464 00:27:49,640 --> 00:27:53,040 The other that we think will really be popular with the development community is the issuance 465 00:27:53,040 --> 00:27:57,880 of the clearing grade permit prior to final plan approval, but provided that the civil 466 00:27:57,880 --> 00:28:02,280 engineering plans have been approved. 467 00:28:02,280 --> 00:28:06,560 We will not issue a clearing grade permit today until those CEPs have been approved. 468 00:28:06,560 --> 00:28:11,280 And we typically require the final plat to be recorded, but we feel like we have other 469 00:28:11,280 --> 00:28:15,760 safeguards in place where this is something that we can offer up to be able to allow someone 470 00:28:15,760 --> 00:28:23,120 to start moving dirt on property in exchange for them taking that extra time to make sure 471 00:28:23,120 --> 00:28:25,920 they engage with the community. 472 00:28:25,920 --> 00:28:33,680 It seems slightly scary to allow a clearing grade permit without a final plat and okay. 473 00:28:33,680 --> 00:28:34,680 Right. 474 00:28:34,680 --> 00:28:40,480 So it is, we believe that we have enough other checks and balances in place to be able to 475 00:28:40,480 --> 00:28:41,480 address it. 476 00:28:41,480 --> 00:28:45,120 And the key thing is the civil engineering plans have to be approved because if the civil 477 00:28:45,120 --> 00:28:48,600 engineering plans are not approved, then we're not going to turn anybody loose to start moving 478 00:28:48,600 --> 00:28:49,600 any dirt. 479 00:28:49,600 --> 00:28:51,200 I mean, that's what it comes down to. 480 00:28:51,200 --> 00:28:52,200 Okay. 481 00:28:52,200 --> 00:28:53,200 Questions? 482 00:28:53,200 --> 00:28:54,200 Commissioner Pruitt. 483 00:28:54,200 --> 00:28:55,200 Thank you, Chair. 484 00:28:55,200 --> 00:28:58,640 Just a few things. 485 00:28:58,640 --> 00:29:05,480 So one on the clearing grade permit question, it says, you know, erosion control and tree 486 00:29:05,480 --> 00:29:10,560 protection fencing have been installed and expected. 487 00:29:10,560 --> 00:29:15,860 I believe final plat, one of the requirements is the tree preservation plan, and that flows 488 00:29:15,860 --> 00:29:18,000 into which trees get protected. 489 00:29:18,000 --> 00:29:25,960 So is the proposal that we could allow that clearing grade permit after the tree preservation 490 00:29:25,960 --> 00:29:32,960 plan has been submitted and that fencing is erected, but before the final plat is filed? 491 00:29:32,960 --> 00:29:38,360 So the, in order for us to approve the civil engineering plans, we make sure, and Haley, 492 00:29:38,360 --> 00:29:42,560 correct me if I'm wrong, but before we approve those civil engineering plans, we make sure 493 00:29:42,560 --> 00:29:47,920 that the tree preservation has also been approved because we realize that those go hand in hand, 494 00:29:47,920 --> 00:29:53,800 so as we review civil engineering plans, if there are grading changes that are being made 495 00:29:53,800 --> 00:29:57,840 or utility easements that are being shifted that are gonna impact trees that were originally 496 00:29:57,840 --> 00:30:01,600 designated for preservation, then we have the applicant update their tree preservation 497 00:30:01,600 --> 00:30:03,980 plan because they still have that responsibility. 498 00:30:03,980 --> 00:30:07,640 So that's why we make sure that the tree preservation, that will still be addressed. 499 00:30:07,640 --> 00:30:11,400 It still has to be approved before those CEPs are approved. 500 00:30:11,400 --> 00:30:15,360 The other thing we do is we also make sure that that tree protection fencing is in place 501 00:30:15,360 --> 00:30:20,760 and has been inspected because we're, and that's part of our process today. 502 00:30:20,760 --> 00:30:25,720 So we're just making sure that you don't get to go pass go and start moving dirt unless 503 00:30:25,720 --> 00:30:28,720 you've got your tree protection fencing installed. 504 00:30:28,720 --> 00:30:30,880 So that's just a reaffirmation of what we do today. 505 00:30:30,880 --> 00:30:31,880 - Okay. 506 00:30:31,880 --> 00:30:37,200 And then I guess two questions about sort of the thresholds of engagement. 507 00:30:37,200 --> 00:30:44,480 Can you explain what the thought is to focus on property owners instead of residents or 508 00:30:44,480 --> 00:30:48,440 business proprietors within that area? 509 00:30:48,440 --> 00:30:55,080 - We did, initially we were thinking what she mentioned earlier was HOAs, but understanding 510 00:30:55,080 --> 00:31:00,880 that some neighborhoods don't have one, they don't even have a organized group. 511 00:31:00,880 --> 00:31:05,320 So then we switched and said maybe we just focus on the property owners. 512 00:31:05,320 --> 00:31:06,320 - Okay. 513 00:31:06,320 --> 00:31:13,440 There's a lot of times we get proposals that are nearby to many residents that are not 514 00:31:13,440 --> 00:31:14,600 property owners. 515 00:31:14,600 --> 00:31:19,840 So I'm not saying that that should be changed, I was just curious whether that had come up. 516 00:31:19,840 --> 00:31:28,360 And then can you explain the threshold of 51%, the way it reads it looks like 51% of 517 00:31:28,360 --> 00:31:35,140 the number of property owners, which is a little different than the 20% of land area 518 00:31:35,140 --> 00:31:39,880 within the perimeter, and then the 51% is different than the 20%, right? 519 00:31:39,880 --> 00:31:45,880 So I'm just trying to understand what the thought is, where we came up with that proposal. 520 00:31:45,880 --> 00:31:50,720 - Do you want me to address that or do you want... 521 00:31:50,720 --> 00:31:53,720 - I almost get right to you, but... 522 00:31:53,720 --> 00:31:54,720 - Go right ahead. 523 00:31:54,720 --> 00:31:55,720 Go right ahead. 524 00:31:55,720 --> 00:31:59,920 - 51%, that's the energy, I mean energy, that's the industry standard, it's the majority. 525 00:31:59,920 --> 00:32:02,440 And then what was that a part of your question? 526 00:32:02,440 --> 00:32:10,720 Is the fact that this language seems like it's the majority of the people who own property 527 00:32:10,720 --> 00:32:17,440 within that border, as opposed to the people who represent the majority of the land within 528 00:32:17,440 --> 00:32:25,360 the border, which is the way the triggering language in state law requires super majority 529 00:32:25,360 --> 00:32:29,160 vote at council, for instance, if they're above a 20% denial, right? 530 00:32:29,160 --> 00:32:30,680 - Do you want to... 531 00:32:30,680 --> 00:32:31,680 - Sure thing. 532 00:32:31,680 --> 00:32:33,040 - That's a great question. 533 00:32:33,040 --> 00:32:39,800 So we were focusing on the residents themselves that had the ownership, but you make a good 534 00:32:39,800 --> 00:32:46,160 point that right now on the 200 foot notification, for example, what triggers the super majority 535 00:32:46,160 --> 00:32:51,040 vote at city council is based upon 20% of the ownership within the notification area. 536 00:32:51,040 --> 00:32:59,800 So if that's something that the commission is interested in us modifying, we can do that. 537 00:32:59,800 --> 00:33:01,020 Just need that direction from you. 538 00:33:01,020 --> 00:33:09,960 So if you believe that the property owners that represent 51% or more of the area within 539 00:33:09,960 --> 00:33:19,280 the 500 foot boundary need to be the ones that are carrying heavier weight, I guess, 540 00:33:19,280 --> 00:33:24,040 in the decision-making process, that's something that we can definitely look into. 541 00:33:24,040 --> 00:33:29,080 Our challenge is we have the 200 foot rule that we have to abide by state law, but we 542 00:33:29,080 --> 00:33:35,560 also send out the courtesy postcards to all residents or I guess their utility bill holders 543 00:33:35,560 --> 00:33:39,960 within 500 feet, because we recognize that we have some folks that are not owners of 544 00:33:39,960 --> 00:33:40,960 the land, right? 545 00:33:40,960 --> 00:33:41,960 They're renters. 546 00:33:41,960 --> 00:33:44,220 They don't own the unit that they live within. 547 00:33:44,220 --> 00:33:48,520 So we were trying to draw some parallels there, hence why we laid it on the 500 feet, trying 548 00:33:48,520 --> 00:33:51,840 to go further out to be able to engage the neighborhood. 549 00:33:51,840 --> 00:33:55,800 But happy to receive, if there's concurrence from the commission for us to change that 550 00:33:55,800 --> 00:34:03,920 to be focused on 51% of ownership representative of the land area within the 500 foot zone, 551 00:34:03,920 --> 00:34:05,480 then we're happy to do that. 552 00:34:05,480 --> 00:34:07,400 And that's why we're having this discussion with you. 553 00:34:07,400 --> 00:34:08,400 Sure. 554 00:34:08,400 --> 00:34:09,400 Yeah. 555 00:34:09,400 --> 00:34:15,240 I mean, I was just curious where the proposal came from primarily. 556 00:34:15,240 --> 00:34:22,740 I think the land ownership rule, while it's codified in state law, is limiting and confusing 557 00:34:22,740 --> 00:34:28,480 and gets us into situations where there's a large number of people that don't have 558 00:34:28,480 --> 00:34:34,880 control over very much of the perimeter of the land or the opposite, right? 559 00:34:34,880 --> 00:34:41,120 So my preference, I guess, from a community engagement perspective would be the number 560 00:34:41,120 --> 00:34:51,000 of residents or business operators within that area and not to be land. 561 00:34:51,000 --> 00:34:58,040 But I want to be sensitive that part of the reason for doing this is to make sure they 562 00:34:58,040 --> 00:35:06,000 have an increased success rate, if you will, that there's general agreement once it comes 563 00:35:06,000 --> 00:35:08,540 to planning and zoning and then council. 564 00:35:08,540 --> 00:35:14,640 So I don't want to suggest that we do something that then gives you less of a confidence in 565 00:35:14,640 --> 00:35:15,640 that manner. 566 00:35:15,640 --> 00:35:16,640 Does that make sense? 567 00:35:16,640 --> 00:35:17,640 I think so. 568 00:35:17,640 --> 00:35:18,640 So yeah. 569 00:35:18,640 --> 00:35:25,960 And then the last thing, it just flew out of my head, oh, yes. 570 00:35:25,960 --> 00:35:32,320 In drafting these rules, were there current or previous developers that we reached out 571 00:35:32,320 --> 00:35:40,960 to to try to understand whether the thresholds and the incentives were a package that would 572 00:35:40,960 --> 00:35:42,760 be enticing to them? 573 00:35:42,760 --> 00:35:50,040 We haven't spoken to anyone specifically about this specific but what kind of prompt this 574 00:35:50,040 --> 00:35:54,360 was a member of an understanding I mentioned previously from that developer that actually 575 00:35:54,360 --> 00:36:00,320 was successfully worked out a deal with the community to change their architectural standards. 576 00:36:00,320 --> 00:36:05,880 So that was a question that we thought was going to be asked and we haven't yet, but 577 00:36:05,880 --> 00:36:06,880 we can. 578 00:36:06,880 --> 00:36:07,880 Yeah. 579 00:36:07,880 --> 00:36:10,040 Keshia, this is kind of in brainstorming stage still, isn't it? 580 00:36:10,040 --> 00:36:11,040 Right? 581 00:36:11,040 --> 00:36:12,040 Yes. 582 00:36:12,040 --> 00:36:16,720 So I guess one correction, we did reach out to Amy Bassett because she's done a fair amount 583 00:36:16,720 --> 00:36:20,640 of engagement, particularly because in Keshia's side of this on, I think it was her previous 584 00:36:20,640 --> 00:36:26,560 slide, when we had that multifamily request, I believe it was Mia's zoning case, the 380 585 00:36:26,560 --> 00:36:27,560 multifamily project. 586 00:36:27,560 --> 00:36:32,320 If you recall, Amy mentioned we had a memorandum of understanding. 587 00:36:32,320 --> 00:36:38,960 And in that particular example, I believe it was the HOA representatives were negotiating 588 00:36:38,960 --> 00:36:42,020 on behalf of the neighborhood, but that's the project that started out where they were 589 00:36:42,020 --> 00:36:46,000 trying to rezone a portion of property at MN so they could get the access and then council 590 00:36:46,000 --> 00:36:49,160 sent it back and was interested in more of a planned development district. 591 00:36:49,160 --> 00:36:52,880 And so they pulled all of the property in and then they were able to work with the nearby 592 00:36:52,880 --> 00:36:56,920 neighborhood and Amy had come forth with that memorandum of understanding. 593 00:36:56,920 --> 00:37:00,440 And so we were like, okay, how can we build upon that? 594 00:37:00,440 --> 00:37:03,800 If that seemed to be very well received from the Planning and Zoning Commission as well 595 00:37:03,800 --> 00:37:08,560 as particularly council, so we're like, okay, maybe she's onto something here and how can 596 00:37:08,560 --> 00:37:15,000 we build upon that and be able to put something in our development code that would possibly 597 00:37:15,000 --> 00:37:17,040 entice others to do something similar? 598 00:37:17,040 --> 00:37:18,040 Okay. 599 00:37:18,040 --> 00:37:23,800 Yeah, I think it looks like a good first start. 600 00:37:23,800 --> 00:37:34,640 My only real comment that doesn't seem incorporated is a way to make sure that this is feasible 601 00:37:34,640 --> 00:37:38,960 for smaller developments and smaller zoning changes, if you will. 602 00:37:38,960 --> 00:37:44,440 For instance, if you're talking about a 500 foot border, that's 10 neighbors on either 603 00:37:44,440 --> 00:37:49,440 side, that's like 100 neighbors that you have to talk to. 604 00:37:49,440 --> 00:37:56,080 And if you're just doing a single or a two lot rezoning, that seems burdensome, a little 605 00:37:56,080 --> 00:38:03,080 bit more than what the area might be, but just a thought, so thank you. 606 00:38:03,080 --> 00:38:06,880 Okay, before we move on, do you have more of your presentation? 607 00:38:06,880 --> 00:38:07,880 Yes. 608 00:38:07,880 --> 00:38:12,120 Why don't I let you continue and then just write your questions down just so we don't 609 00:38:12,120 --> 00:38:15,920 get too bogged down before she has told us everything, because a lot of things might 610 00:38:15,920 --> 00:38:17,400 be answered on the next slide. 611 00:38:17,400 --> 00:38:23,520 So just want to discuss briefly the limitations. 612 00:38:23,520 --> 00:38:28,000 So agreements, when they're submitted to us, they must clearly state the terms and conditions 613 00:38:28,000 --> 00:38:32,400 for the timeframe, but when those performance commitments are going to be made, they cannot 614 00:38:32,400 --> 00:38:36,200 conflict with any other regulatory documents within the city. 615 00:38:36,200 --> 00:38:44,200 The city will not be enforcing them, however, if we do hear that the developer has failed 616 00:38:44,200 --> 00:38:49,040 to perform or defaulted on what they promised the neighborhood, that may impact their ability 617 00:38:49,040 --> 00:38:55,480 to apply for eligible for centers in the future. 618 00:38:55,480 --> 00:38:59,280 So neighbor engagement, so we mentioned earlier in our conversation, and we know it's very 619 00:38:59,280 --> 00:39:05,000 important in our community, so we will continue to, citizen participation that's already in 620 00:39:05,000 --> 00:39:10,480 the code, we will still follow those and still encourage our developers to have those neighborhood 621 00:39:10,480 --> 00:39:11,480 meetings. 622 00:39:11,480 --> 00:39:17,040 But one thing we've done recently is we've created a flyer to help developers when they're 623 00:39:17,040 --> 00:39:21,240 communicating with neighborhood residents about their projects. 624 00:39:21,240 --> 00:39:25,720 And so we're planning to get this posted on our website as well as be available at our 625 00:39:25,720 --> 00:39:30,680 front desk and during pre-application meetings and wherever else we find that it could be 626 00:39:30,680 --> 00:39:38,800 a resource for our developer community. 627 00:39:38,800 --> 00:39:42,440 That concludes my presentation, I'm open for questions. 628 00:39:42,440 --> 00:39:49,760 So knowing this is just in like brainstorming capacity and all that, do you have a timeline 629 00:39:49,760 --> 00:39:52,040 of other, like what you want to do from here? 630 00:39:52,040 --> 00:39:55,920 I mean, we're just talking about it now, okay, so here we go. 631 00:39:55,920 --> 00:39:56,920 Yes. 632 00:39:56,920 --> 00:40:01,880 So tonight we want to get your feedback, we'll go back and discuss some of the comments and 633 00:40:01,880 --> 00:40:06,400 items that you've asked us to look into, but we're planning to bring it back to you for 634 00:40:06,400 --> 00:40:11,480 a public hearing July 17 and council August 6th. 635 00:40:11,480 --> 00:40:12,480 For action then? 636 00:40:12,480 --> 00:40:13,480 Yes. 637 00:40:13,480 --> 00:40:14,480 Understood. 638 00:40:14,480 --> 00:40:15,480 Okay. 639 00:40:15,480 --> 00:40:16,480 Question, Commissioner Thacker. 640 00:40:16,480 --> 00:40:21,300 So I've got a few questions, sorry. 641 00:40:21,300 --> 00:40:26,000 So what happens in the event that the HOA representative isn't actually living within 642 00:40:26,000 --> 00:40:30,080 500 feet of the change, right? 643 00:40:30,080 --> 00:40:33,360 So if you have a neighborhood and you have a representative that lives on the other side 644 00:40:33,360 --> 00:40:37,960 of the neighborhood and they're the acting decision maker, but they don't have to look 645 00:40:37,960 --> 00:40:43,680 at it, I think that's something maybe to be considered, right? 646 00:40:43,680 --> 00:40:47,280 The other thing I wanted to ask is who determines what the greatest need of the neighborhood 647 00:40:47,280 --> 00:40:48,280 is? 648 00:40:48,280 --> 00:40:49,280 And that's a twofold issue. 649 00:40:49,280 --> 00:40:56,560 Number one, you want to make sure that, you know, it's whatever is going to benefit the 650 00:40:56,560 --> 00:40:58,240 neighborhood the most, right? 651 00:40:58,240 --> 00:41:01,840 And sorry, something just flew out of my head. 652 00:41:01,840 --> 00:41:07,200 I think it could also, the other part was I think it could also further delay development. 653 00:41:07,200 --> 00:41:10,380 So if you're trying to get consensus with everybody in the neighborhood and everybody 654 00:41:10,380 --> 00:41:14,620 starts out thinking, "Oh, well, I think we should really press for an architectural facade 655 00:41:14,620 --> 00:41:18,880 of a certain building," and then another group is like, "Yeah, we thought about that, but 656 00:41:18,880 --> 00:41:22,520 maybe we should also do this," meanwhile the developer is sitting there waiting to decide 657 00:41:22,520 --> 00:41:25,680 whether or not he's even going to be able to break ground. 658 00:41:25,680 --> 00:41:28,680 And I think in an attempt to make something go faster, we could actually be making it 659 00:41:28,680 --> 00:41:31,480 go much slower. 660 00:41:31,480 --> 00:41:39,240 And then finally, you know, getting 51% of a group of people to agree to something, you 661 00:41:39,240 --> 00:41:43,320 hope that the other 49% are just, you know, don't care, right? 662 00:41:43,320 --> 00:41:48,620 But if they do care and you're setting 51% of a group of people against 49% of a group 663 00:41:48,620 --> 00:41:54,400 of people that live right across the street from each other, then you have an issue. 664 00:41:54,400 --> 00:41:57,720 So those are just things I think maybe we need to consider. 665 00:41:57,720 --> 00:42:02,080 It's one thing for, I don't know, you know, a council to be divided. 666 00:42:02,080 --> 00:42:06,960 It's another thing for a neighborhood that lives right across the street from each other 667 00:42:06,960 --> 00:42:11,540 to not get along because they decided to take a different approach and vote a different 668 00:42:11,540 --> 00:42:13,520 way on how this is organized. 669 00:42:13,520 --> 00:42:20,400 >> If I could offer a response to that, so this really isn't any different than present 670 00:42:20,400 --> 00:42:28,000 day, right, from a standpoint of developer goes and engages with neighborhood and is 671 00:42:28,000 --> 00:42:33,440 dealing with a group of folks that may have differing opinions. 672 00:42:33,440 --> 00:42:34,440 And we saw that. 673 00:42:34,440 --> 00:42:36,520 The St. Mark's zoning case is a good example of that. 674 00:42:36,520 --> 00:42:41,280 We had some folks who, you know, some people were saying, well, you know, the neighborhood 675 00:42:41,280 --> 00:42:45,400 park is used heavily and others were saying, well, no, it's not really. 676 00:42:45,400 --> 00:42:49,400 And yes, we've got these concerns in the neighborhood but others are saying, you know, no, it might. 677 00:42:49,400 --> 00:42:56,200 So any neighborhood engagement potentially has differing viewpoints being expressed. 678 00:42:56,200 --> 00:43:03,520 So you know, the HOA representative, to your point, if they don't live within the 500 feet, 679 00:43:03,520 --> 00:43:08,380 that's up to the neighborhood residents themselves to decide if they want the HOA to represent 680 00:43:08,380 --> 00:43:10,680 them or who from their HOA. 681 00:43:10,680 --> 00:43:15,320 You know, not all neighborhoods in Denton have HOA representation. 682 00:43:15,320 --> 00:43:19,240 So it's really the neighbors themselves, we're trying to put the power in the neighborhoods 683 00:43:19,240 --> 00:43:24,200 for them to decide who is going to speak and represent them. 684 00:43:24,200 --> 00:43:29,040 It's also, you know, but that's no different today when developer comes and is trying to 685 00:43:29,040 --> 00:43:34,920 engage with the neighborhood and, you know, who's going to lead the discussions with the 686 00:43:34,920 --> 00:43:35,920 developer. 687 00:43:35,920 --> 00:43:41,920 So, you know, for us to try and put forth an opportunity for an agreement, you know, 688 00:43:41,920 --> 00:43:46,160 we had to establish some sort of parameters and we had a fair amount of conversation on 689 00:43:46,160 --> 00:43:52,200 this last week also because previously we didn't set a geographic area to it. 690 00:43:52,200 --> 00:43:55,360 But to your point, it's like, okay, well, then who all gets to participate, right? 691 00:43:55,360 --> 00:44:03,720 So we decided, all right, we need to define a geographic area to represent who is in support 692 00:44:03,720 --> 00:44:08,000 or not at least for when it comes to this agreement. 693 00:44:08,000 --> 00:44:11,360 Doing all of this neighborhood engagement, yes, it does lengthen process. 694 00:44:11,360 --> 00:44:13,600 I mean, we've seen that with projects. 695 00:44:13,600 --> 00:44:17,320 This had spoken to that as well when she did the memorandum of understanding. 696 00:44:17,320 --> 00:44:23,160 I think they did 14 months worth of public engagement that, you know, she was -- their 697 00:44:23,160 --> 00:44:26,120 team was going to be doing that public engagement regardless, right? 698 00:44:26,120 --> 00:44:31,960 So, you know, they're -- in talking with her, and I'm not trying to put words in her mouth, 699 00:44:31,960 --> 00:44:35,960 but the way that we understood it from our conversations with her is that there is an 700 00:44:35,960 --> 00:44:40,520 opportunity then if we're going to go through this extensive public engagement process and 701 00:44:40,520 --> 00:44:45,360 really try to be responsive to the neighborhood, is there something that we could potentially 702 00:44:45,360 --> 00:44:51,880 get in return to offset the length of time that might have been spent? 703 00:44:51,880 --> 00:44:55,360 So for us, that's why we looked at from a process standpoint, what can we offer from 704 00:44:55,360 --> 00:44:56,360 a process? 705 00:44:56,360 --> 00:45:00,360 And so, you know, hence the clearing grade, we get requests all the time on a regular 706 00:45:00,360 --> 00:45:01,360 basis. 707 00:45:01,360 --> 00:45:02,360 Can we get under construction sooner? 708 00:45:02,360 --> 00:45:04,000 Can we move dirt sooner? 709 00:45:04,000 --> 00:45:09,480 So we're like, okay, maybe we leverage that clearing grade permit to encourage folks to 710 00:45:09,480 --> 00:45:14,080 -- or to encourage the development community to do the public engagement. 711 00:45:14,080 --> 00:45:18,680 And we tell them on a regular basis, and I bet, you know, my -- the peanut gallery in 712 00:45:18,680 --> 00:45:20,600 the back there would all shake their heads, yes. 713 00:45:20,600 --> 00:45:24,440 You know, when we do pre-application conferences with people, we tell them, look, it's imperative 714 00:45:24,440 --> 00:45:28,320 you engage the neighborhood or, you know, especially anything near ranch estates. 715 00:45:28,320 --> 00:45:31,960 We know some of the challenges there, the Denia neighborhood, right? 716 00:45:31,960 --> 00:45:36,280 But all the neighborhoods, we tell folks, make sure you engage the neighborhoods. 717 00:45:36,280 --> 00:45:41,400 Do your public engagement efforts, and, you know, we've seen some applicants come before 718 00:45:41,400 --> 00:45:45,620 the Planning and Zoning Commission who did not do any engagement despite what we told 719 00:45:45,620 --> 00:45:49,440 them to, and you all sent them packing and said, go back and go do the neighborhood engagement 720 00:45:49,440 --> 00:45:51,320 before you come back with your request. 721 00:45:51,320 --> 00:45:55,800 So we're -- you know, we continue to push on that front, but our thought was, what can 722 00:45:55,800 --> 00:46:02,760 we do to help better support in -- and encourage that development community to do the neighborhood 723 00:46:02,760 --> 00:46:03,760 engagement? 724 00:46:03,760 --> 00:46:07,240 And so that's why we thought, you know, there might be some value to putting this in there. 725 00:46:07,240 --> 00:46:11,160 You know, right now we have in the code the Citizen Participation Plan, but nobody utilizes 726 00:46:11,160 --> 00:46:12,160 it. 727 00:46:12,160 --> 00:46:14,440 It's all encouraged and recommendations, right? 728 00:46:14,440 --> 00:46:17,960 So it was like, okay, what can we do just to help entice the development community to 729 00:46:17,960 --> 00:46:22,280 give them something in exchange for doing the neighborhood engagement? 730 00:46:22,280 --> 00:46:27,880 Just as a follow up -- Sure. 731 00:46:27,880 --> 00:46:33,320 -- what happens in the event that they go so far as to entertain this idea until they 732 00:46:33,320 --> 00:46:36,680 get the permit, and then, you know, they're left in the dust, the neighborhoods left in 733 00:46:36,680 --> 00:46:38,040 the dust? 734 00:46:38,040 --> 00:46:39,040 So that's a great question. 735 00:46:39,040 --> 00:46:42,040 Keisha, do you want to take a first attempt at that, or do you want me to? 736 00:46:42,040 --> 00:46:44,080 I think that was on the previous slide where they would -- 737 00:46:44,080 --> 00:46:45,080 Yeah, it was on the slide. 738 00:46:45,080 --> 00:46:46,080 Yeah, where they would not be entitled. 739 00:46:46,080 --> 00:46:51,160 We're not going to enforce, but we do -- we are proposing to add in here. 740 00:46:51,160 --> 00:46:57,680 If we hear that the developer did not do what they said they were going to do, that that 741 00:46:57,680 --> 00:47:01,200 would impact their ability to apply for incentives in the future. 742 00:47:01,200 --> 00:47:02,200 Okay. 743 00:47:02,200 --> 00:47:07,320 Is there -- to anyone else, is there just the mildest hint that we're trying to like 744 00:47:07,320 --> 00:47:09,360 legislate behavior here? 745 00:47:09,360 --> 00:47:12,480 Sorry, I just didn't -- No, you're good. 746 00:47:12,480 --> 00:47:13,480 Okay. 747 00:47:13,480 --> 00:47:14,480 I'm going to let somebody else speak. 748 00:47:14,480 --> 00:47:15,480 Commissioner Cole. 749 00:47:15,480 --> 00:47:16,480 Thank you, Chair. 750 00:47:16,480 --> 00:47:21,140 I mean, this, in my mind, is a solution looking for a problem. 751 00:47:21,140 --> 00:47:23,200 We already go through this. 752 00:47:23,200 --> 00:47:31,040 I mean, this is just adding a process -- we are already the most process-heavy municipality 753 00:47:31,040 --> 00:47:38,120 in development in the Metroplex, if not the state, of our size. 754 00:47:38,120 --> 00:47:41,920 And this is adding another hurdle. 755 00:47:41,920 --> 00:47:48,640 And I mean, if we let neighborhoods veto development, it would still be like we were in 1963. 756 00:47:48,640 --> 00:47:54,680 Well, I don't think this necessarily -- I realize that, but I'm getting extraordinary 757 00:47:54,680 --> 00:48:01,800 a little bit on my -- but I just think this is a redundancy that's unnecessary. 758 00:48:01,800 --> 00:48:06,760 Why would we make it more difficult for someone to develop? 759 00:48:06,760 --> 00:48:10,040 I mean, we already are difficult. 760 00:48:10,040 --> 00:48:13,600 We already have this long process. 761 00:48:13,600 --> 00:48:15,360 Why would we add onto it? 762 00:48:15,360 --> 00:48:19,180 We already take these things into consideration; there's just no teeth in it. 763 00:48:19,180 --> 00:48:24,200 I guess maybe this adds teeth to that. 764 00:48:24,200 --> 00:48:27,000 But we already do it. 765 00:48:27,000 --> 00:48:36,560 And I'm just worried that we're just sitting here just going to wake up a year from now 766 00:48:36,560 --> 00:48:40,560 and who's going to come in here and do a project? 767 00:48:40,560 --> 00:48:47,800 I mean, some will, but we're -- I mean, we got Dinton-centric -- we got Dinton, small 768 00:48:47,800 --> 00:48:52,200 business owners, that are construction companies that will not take a Dinton project. 769 00:48:52,200 --> 00:48:53,200 Okay. 770 00:48:53,200 --> 00:48:54,200 I don't want to get off-topic. 771 00:48:54,200 --> 00:48:55,200 Okay. 772 00:48:55,200 --> 00:48:56,200 Let's see. 773 00:48:56,200 --> 00:48:57,200 Yeah, I agree. 774 00:48:57,200 --> 00:48:58,200 Okay. 775 00:48:58,200 --> 00:48:59,320 But I just think this is a solution looking for a problem. 776 00:48:59,320 --> 00:49:07,760 I don't think this forces anybody to do anything, but what I didn't hear answered, and maybe 777 00:49:07,760 --> 00:49:12,620 I missed it at the beginning, is why are we doing this? 778 00:49:12,620 --> 00:49:20,800 Because we do -- I think since we have started to kind of press a little bit more to have 779 00:49:20,800 --> 00:49:26,140 neighborhood engagement, I think we have had more neighborhood engagement. 780 00:49:26,140 --> 00:49:34,320 So I'm trying to understand exactly, I mean, do we really think that we don't have enough 781 00:49:34,320 --> 00:49:39,660 so that offering incentives is going to get more engagement? 782 00:49:39,660 --> 00:49:44,320 Is that why we would be doing this? 783 00:49:44,320 --> 00:49:46,380 So great question. 784 00:49:46,380 --> 00:49:52,720 We are trying to help incentivize developers to make sure that they're going and engaging 785 00:49:52,720 --> 00:49:53,720 the community. 786 00:49:53,720 --> 00:49:57,340 At the end of the day, I mean, they don't have to. 787 00:49:57,340 --> 00:50:01,800 This agreement would not prevent somebody from submitting a zoning application. 788 00:50:01,800 --> 00:50:06,240 If they can still move forward with the zoning application, they could still come forth to 789 00:50:06,240 --> 00:50:10,320 the Planning and Zoning Commission and Council without an agreement, right? 790 00:50:10,320 --> 00:50:16,500 So it's just like today, you've had zoning cases in the past where you've taken action 791 00:50:16,500 --> 00:50:19,600 on them and haven't had neighborhood agreement. 792 00:50:19,600 --> 00:50:25,800 So it's not preventing anybody, to your point, with concerns about delaying somebody further. 793 00:50:25,800 --> 00:50:31,560 So we were trying to offer an incentive that we know it's important from the Planning and 794 00:50:31,560 --> 00:50:34,600 Zoning Commission, City Council, to engage the community. 795 00:50:34,600 --> 00:50:41,000 So what can we offer to the development community that might help save them a little bit of 796 00:50:41,000 --> 00:50:44,320 time on the backside for the engagement efforts that they've done? 797 00:50:44,320 --> 00:50:50,440 So it is to get, you're thinking it's to get more engagement that you think we're not getting 798 00:50:50,440 --> 00:50:51,440 currently? 799 00:50:51,440 --> 00:50:52,440 Yes? 800 00:50:52,440 --> 00:50:53,440 Correct. 801 00:50:53,440 --> 00:50:59,840 Because, you know, and I think the other thing you have is people that are, people that want 802 00:50:59,840 --> 00:51:02,080 to be engaged will be engaged, right? 803 00:51:02,080 --> 00:51:06,480 If someone's truly concerned about a project, then they're the ones that are going to be 804 00:51:06,480 --> 00:51:07,480 involved. 805 00:51:07,480 --> 00:51:12,760 A lot of times we have projects that come forth where people don't care, right? 806 00:51:12,760 --> 00:51:17,120 They're apathetic or they have no issue associated with it. 807 00:51:17,120 --> 00:51:23,000 I would say we are a well-engaged community in that our residents are very interested 808 00:51:23,000 --> 00:51:24,000 in what happens. 809 00:51:24,000 --> 00:51:28,520 I mean, we've put forth a variety of different notification tools that we utilize to be able 810 00:51:28,520 --> 00:51:32,320 to help the community understand what's happening near them. 811 00:51:32,320 --> 00:51:36,800 I mean, we've done the website, right, where people can go in and put their information 812 00:51:36,800 --> 00:51:41,560 and select a distance to get updates regarding any projects within a certain distance of 813 00:51:41,560 --> 00:51:42,560 them, right? 814 00:51:42,560 --> 00:51:51,040 So it's a means of, again, what can we do to possibly encourage the developer to do 815 00:51:51,040 --> 00:51:57,320 more public engagement and in exchange for doing public engagement, then how can we help 816 00:51:57,320 --> 00:51:59,440 you on the backside a little bit? 817 00:51:59,440 --> 00:52:03,440 And about like being able to issue that clearing grade permit and then also processing those 818 00:52:03,440 --> 00:52:10,720 zoning compliance plans and the CEPs concurrently might be an opportunity that helps extend 819 00:52:10,720 --> 00:52:14,080 an olive branch to them for the troubles of their engagement, if you want to look at it 820 00:52:14,080 --> 00:52:15,080 from that perspective. 821 00:52:15,080 --> 00:52:20,160 Honestly, with the zoning compliance plan and CEPs, you're more savvy developers. 822 00:52:20,160 --> 00:52:24,720 They will be the ones that will try to utilize that process. 823 00:52:24,720 --> 00:52:29,920 I think for more complex sites, they'll probably split those apart, but where it really helps 824 00:52:29,920 --> 00:52:35,240 them gain a little bit of time in our development approval process is by issuing that clearing 825 00:52:35,240 --> 00:52:40,840 grade permit following the approval of the CEPs and I believe we need to correct our 826 00:52:40,840 --> 00:52:45,280 slide because it said prior to final plan approval, I believe our intention was we were 827 00:52:45,280 --> 00:52:49,600 going to have final plan approval, but prior to filing because right now we require that 828 00:52:49,600 --> 00:52:54,500 plat to be filed before someone can go move dirt. 829 00:52:54,500 --> 00:53:00,480 Many other communities allow for the final plat to be filed of record after all the public 830 00:53:00,480 --> 00:53:02,760 improvements have been constructed. 831 00:53:02,760 --> 00:53:05,480 That's where we are different from other communities. 832 00:53:05,480 --> 00:53:08,680 The state statute does now allow for that. 833 00:53:08,680 --> 00:53:12,720 We're trying to also work on making some updates to sub chapter two as a result of House Bill 834 00:53:12,720 --> 00:53:14,760 3699. 835 00:53:14,760 --> 00:53:19,040 That's taken us longer to be able to get through that process, but one of the things that came 836 00:53:19,040 --> 00:53:23,920 out of the last legislative session is more flexibility on the platting side of things 837 00:53:23,920 --> 00:53:29,720 where we can approve them administratively, also being able to approve extensions administratively 838 00:53:29,720 --> 00:53:32,840 without having to put them on your agenda. 839 00:53:32,840 --> 00:53:40,360 We're trying to utilize tools that we have that state law allows that might be an opportunity 840 00:53:40,360 --> 00:53:44,600 to save someone time on their development process with us and using that. 841 00:53:44,600 --> 00:53:52,360 I have to figure out like weighing the time of what are they really saving with those 842 00:53:52,360 --> 00:53:59,280 incentives and what is it costing them to get these signatures and go through that part, 843 00:53:59,280 --> 00:54:07,080 which makes it a little more complicated than we even have now, just engaging with the community. 844 00:54:07,080 --> 00:54:10,600 >> Considering the presentation that was presented, is there any data that shows which pockets 845 00:54:10,600 --> 00:54:14,640 of the community are more engaged than the other areas? 846 00:54:14,640 --> 00:54:17,840 So more engaged versus more less engaged? 847 00:54:17,840 --> 00:54:22,840 >> I don't think she had that on this slide. 848 00:54:22,840 --> 00:54:24,360 >> We didn't present that information. 849 00:54:24,360 --> 00:54:28,160 I'm not sure we can look and see if we have something and bring it back. 850 00:54:28,160 --> 00:54:32,800 >> We know from experience certain things, which we could certainly share with you, just 851 00:54:32,800 --> 00:54:38,120 from years of being here and seeing communities, but certainly can share with you. 852 00:54:38,120 --> 00:54:40,440 Does anyone else have anything for Keisha right now? 853 00:54:40,440 --> 00:54:43,800 >> I have a couple. 854 00:54:43,800 --> 00:54:48,000 Going back to the best practices that were presented, was there any data that was used 855 00:54:48,000 --> 00:54:50,480 or sourced to develop those best practices? 856 00:54:50,480 --> 00:54:51,480 >> Yes. 857 00:54:51,480 --> 00:54:52,480 Yes. 858 00:54:52,480 --> 00:54:58,520 I can't call them off the top of my head, but yes, we did look at best practices, also 859 00:54:58,520 --> 00:55:03,760 looked at various different what other cities have done to encourage development and just 860 00:55:03,760 --> 00:55:08,400 their own personal experience interacting with the community and public engagement. 861 00:55:08,400 --> 00:55:11,760 That's what we used to create that flyer. 862 00:55:11,760 --> 00:55:16,280 >> Could you go back to the flyer if possible? 863 00:55:16,280 --> 00:55:21,040 With that, if you do have data that demonstrates neighborhoods or pockets of the community 864 00:55:21,040 --> 00:55:29,600 that are more highly engaged, it may be a point to explore if the recommendations could 865 00:55:29,600 --> 00:55:34,560 include best practices for those neighborhoods that are more highly engaged and best practices 866 00:55:34,560 --> 00:55:39,360 that are listed for those neighborhoods that aren't as highly engaged to determine, again, 867 00:55:39,360 --> 00:55:45,280 if the point is to increase engagement, how can we better target those areas of the community 868 00:55:45,280 --> 00:55:47,160 that aren't as engaged? 869 00:55:47,160 --> 00:55:48,680 Is there something that we haven't considered? 870 00:55:48,680 --> 00:55:52,200 Is there something that seems to work a little bit more? 871 00:55:52,200 --> 00:55:59,680 On the best practices list, is there anything that suggests any written materials in different 872 00:55:59,680 --> 00:56:03,400 languages that are reflective of the demographics of the communities? 873 00:56:03,400 --> 00:56:04,400 >> Yes. 874 00:56:04,400 --> 00:56:05,400 Yes, there is. 875 00:56:05,400 --> 00:56:11,920 And even mentioned having a translator at meetings, if possible, if need be. 876 00:56:11,920 --> 00:56:12,920 Yes. 877 00:56:12,920 --> 00:56:13,920 >> Okay. 878 00:56:13,920 --> 00:56:17,960 I'm just checking my list. 879 00:56:17,960 --> 00:56:22,320 One of the other things I just want to state is while I recognize that there might be specific 880 00:56:22,320 --> 00:56:28,000 challenges to what's being presented, I think that for me, what I see is education. 881 00:56:28,000 --> 00:56:31,880 I think there is a comment that was made that those who want to engage will engage, but 882 00:56:31,880 --> 00:56:35,760 we also have to consider that there may be those that don't know how to engage, and so 883 00:56:35,760 --> 00:56:41,160 this could be the first type of possibility in which they can engage just by looking at 884 00:56:41,160 --> 00:56:42,160 things a little bit differently. 885 00:56:42,160 --> 00:56:48,120 And so I do think that their experiences are important to consider, and so I would stress 886 00:56:48,120 --> 00:56:53,200 to kind of take the lens of this could be a possibility for education to increase that 887 00:56:53,200 --> 00:56:54,200 civic engagement. 888 00:56:54,200 --> 00:56:55,200 >> Thank you. 889 00:56:55,200 --> 00:56:56,200 Thanks. 890 00:56:56,200 --> 00:56:57,200 Commissioner Villareal. 891 00:56:57,200 --> 00:56:59,900 >> Thank you, Chair, and thank you for the presentation. 892 00:56:59,900 --> 00:57:05,160 I'm in favor of anything that improves and pushes for additional community engagement, 893 00:57:05,160 --> 00:57:07,240 so thank you for putting this forward. 894 00:57:07,240 --> 00:57:13,160 I do want to just -- I know this was mentioned briefly during the conversation with Vice 895 00:57:13,160 --> 00:57:21,840 Chair Pruitt, but if we could perhaps change it from property owners to residents/business 896 00:57:21,840 --> 00:57:25,440 proprietors, I would be in favor of that change. 897 00:57:25,440 --> 00:57:29,400 I just wanted to go on the record and say I'm in favor of changing it to that. 898 00:57:29,400 --> 00:57:30,400 Thank you. 899 00:57:30,400 --> 00:57:31,400 >> Thank you. 900 00:57:31,400 --> 00:57:33,160 >> And I'm not sure you can do residents, because I don't know that they would have 901 00:57:33,160 --> 00:57:41,520 a legal stake in a signature, because a resident could be a tenant, and I don't know if a tenant 902 00:57:41,520 --> 00:57:42,520 -- 903 00:57:42,520 --> 00:57:43,520 >> Okay. 904 00:57:43,520 --> 00:57:44,520 >> Right. 905 00:57:44,520 --> 00:57:45,520 Yeah. 906 00:57:45,520 --> 00:57:46,760 >> That makes sense. 907 00:57:46,760 --> 00:57:50,260 >> That's what comes off the top of my head when we're talking about like validating signatures, 908 00:57:50,260 --> 00:57:51,260 you know? 909 00:57:51,260 --> 00:57:55,080 I don't know exactly where that fits. 910 00:57:55,080 --> 00:58:03,560 I think since none of us saw any of this until like right now, between now and when you want 911 00:58:03,560 --> 00:58:14,320 us to actually take action, can we get this delivered to our email when you think it's 912 00:58:14,320 --> 00:58:20,320 ready for us to look at so that we can maybe offer more comments and get a little bit better 913 00:58:20,320 --> 00:58:27,280 hand, you know, it's kind of a lot in a very short amount of time, and, you know, everybody's 914 00:58:27,280 --> 00:58:33,800 kind of putting things together in their head, and helpful to -- you know, it's hard for 915 00:58:33,800 --> 00:58:36,880 us to give you direction on something that we're seeing for the first time. 916 00:58:36,880 --> 00:58:43,320 I mean, that's how I feel, and from the varying questions and concerns, I'm not sure anybody's 917 00:58:43,320 --> 00:58:50,320 ready to say, oh, we'll change this and do this because we just haven't wrapped our brains 918 00:58:50,320 --> 00:58:51,320 around it. 919 00:58:51,320 --> 00:58:52,320 >> Absolutely. 920 00:58:52,320 --> 00:58:53,320 No, I see what you're saying. 921 00:58:53,320 --> 00:58:57,400 And I know originally we thought we were -- let's see. 922 00:58:57,400 --> 00:59:02,920 We might be able to have a draft ordinance to have in a work session discussion at the 923 00:59:02,920 --> 00:59:07,600 next planning and zoning commission meeting to give you -- let us look at that. 924 00:59:07,600 --> 00:59:10,280 But if we can do that, we'll try and do so. 925 00:59:10,280 --> 00:59:15,320 Because we were trying to bring this for a public hearing in July, but it may be that 926 00:59:15,320 --> 00:59:20,360 since we've got our second June meeting, maybe we can put it -- if our draft is in good shape, 927 00:59:20,360 --> 00:59:27,640 we can put that on your agenda for a work session conversation, and so that way you 928 00:59:27,640 --> 00:59:31,880 all can start looking at the language and seeing if there's anything that we need to 929 00:59:31,880 --> 00:59:36,480 modify that might be of interest, and -- but, yeah, we'll definitely look into it. 930 00:59:36,480 --> 00:59:40,880 >> And probably even just even the presentation, just having this again in front of us to be 931 00:59:40,880 --> 00:59:46,120 able to read and reread, you know, where we can get with our thoughts and whatnot. 932 00:59:46,120 --> 00:59:47,120 >> Sure. 933 00:59:47,120 --> 00:59:48,120 >> Okay. 934 00:59:48,120 --> 00:59:49,120 Commissioner Pruitt. 935 00:59:49,120 --> 00:59:54,720 >> Briefly, I just want to summarize because I've rambled before. 936 00:59:54,720 --> 01:00:01,200 Generally in favor, I hear the concerns and I share them about let's not slow things down. 937 01:00:01,200 --> 01:00:05,580 The way I see this going is you're either going to have it onerous enough that nobody 938 01:00:05,580 --> 01:00:10,000 still takes advantage of it and so it doesn't matter, right? 939 01:00:10,000 --> 01:00:17,800 Or enticing enough that the projects where it makes financial sense to go through this 940 01:00:17,800 --> 01:00:21,440 step will do it, right? 941 01:00:21,440 --> 01:00:30,880 The concern I have along the line of are we creating a system where you kind of have to 942 01:00:30,880 --> 01:00:39,160 do this to get it through council is that we already just by nature of how projects 943 01:00:39,160 --> 01:00:50,360 go and the scale of financing incentivize larger projects that have a bigger impact 944 01:00:50,360 --> 01:00:53,400 to the community. 945 01:00:53,400 --> 01:01:02,420 And I'd like to make sure that as we do this, we make it a more equitable process from a 946 01:01:02,420 --> 01:01:10,160 big giant $800 million development down to the, hey, I've got a building south of downtown 947 01:01:10,160 --> 01:01:16,680 and I need so and so and I have $50,000, right? 948 01:01:16,680 --> 01:01:18,120 So I'm sensitive to that. 949 01:01:18,120 --> 01:01:19,120 So thank you. 950 01:01:19,120 --> 01:01:20,120 >> Thank you. 951 01:01:20,120 --> 01:01:21,120 >> Thank you. 952 01:01:21,120 --> 01:01:22,120 >> Thank you. 953 01:01:22,120 --> 01:01:23,960 >> Thank you very much. 954 01:01:23,960 --> 01:01:28,720 I know we've got one more work session report. 955 01:01:28,720 --> 01:01:32,220 Do you want to continue or break for food and then continue? 956 01:01:32,220 --> 01:01:33,720 I'm going to get a consensus. 957 01:01:33,720 --> 01:01:35,720 How is everybody doing? 958 01:01:35,720 --> 01:01:36,720 Everybody okay? 959 01:01:36,720 --> 01:01:39,960 Because I think Keisha, this is yours, yes? 960 01:01:39,960 --> 01:01:40,960 >> Yes. 961 01:01:40,960 --> 01:01:41,960 >> Okay. 962 01:01:41,960 --> 01:01:42,960 Then you've got it ready to go. 963 01:01:42,960 --> 01:01:49,320 Let's go ahead and call 3B, PZ24090, receive a report, hold a discussion regarding the 964 01:01:49,320 --> 01:01:54,800 process of PNZ commission operational procedures as it relates to reconsideration. 965 01:01:54,800 --> 01:01:58,320 >> Good evening again, Chair and commissioners. 966 01:01:58,320 --> 01:02:07,000 I'm here before you to discuss possibility of adding a procedure in our code for planning 967 01:02:07,000 --> 01:02:10,800 a zoning commission to have a reconsideration process. 968 01:02:10,800 --> 01:02:16,840 This is again is a staff initiated request due to challenges with the prior reconsideration 969 01:02:16,840 --> 01:02:23,240 last summer and confirm the need that you all need your own codified process. 970 01:02:23,240 --> 01:02:29,240 I think currently right now you're following City Council's reconsideration process which 971 01:02:29,240 --> 01:02:34,160 allows for you to request from the director that an item be reconsidered prior to your 972 01:02:34,160 --> 01:02:38,840 next meeting date and if the item is already -- but if the item is already presented to 973 01:02:38,840 --> 01:02:44,280 City Council agenda, excuse me, then you have to appear before City Council and make that 974 01:02:44,280 --> 01:02:50,720 request at the public hearing and City Council would have to then agree to send the item 975 01:02:50,720 --> 01:02:53,080 back to planning a zoning commission. 976 01:02:53,080 --> 01:03:00,440 So we want to create a process for you all to be able to reconsider items and have that 977 01:03:00,440 --> 01:03:03,520 code -- and have that, excuse me, codified in our code. 978 01:03:03,520 --> 01:03:06,800 So here is the process that we are recommending. 979 01:03:06,800 --> 01:03:09,080 So the first item, there's no change, right? 980 01:03:09,080 --> 01:03:13,320 So you will still make the request of someone that's on the prevailing side of a vote will 981 01:03:13,320 --> 01:03:15,760 make a request to the director. 982 01:03:15,760 --> 01:03:18,360 The only thing that's going to change is the timeframe. 983 01:03:18,360 --> 01:03:23,840 So currently you can make that request and you have up to a week and a half prior to 984 01:03:23,840 --> 01:03:26,440 your next meeting to make the request. 985 01:03:26,440 --> 01:03:33,040 Due to sometimes items are fast-tracked and staff needs time to alert the city secretary's 986 01:03:33,040 --> 01:03:38,440 office that an item needs to be pulled from the council agenda if there's been an item 987 01:03:38,440 --> 01:03:41,400 pulled that you've requested to be reconsidered. 988 01:03:41,400 --> 01:03:46,200 We need that request by 10 a.m. on Friday after your meeting. 989 01:03:46,200 --> 01:03:58,080 So that is changing from a week and a half down to one and a half days. 990 01:03:58,080 --> 01:04:01,920 So just to continue with the process, I'm sure you're all familiar. 991 01:04:01,920 --> 01:04:08,440 So items presented to you and if it is voted -- excuse me, if we receive it, we will put 992 01:04:08,440 --> 01:04:12,920 it back on the agenda as an item for consideration, the commission will have the opportunity to 993 01:04:12,920 --> 01:04:15,560 vote to reconsider the item or not. 994 01:04:15,560 --> 01:04:22,280 If it is, then we'll go through the proper protocols to get the item publicly noticed 995 01:04:22,280 --> 01:04:24,600 and then back on for public hearing. 996 01:04:24,600 --> 01:04:28,640 If it fails, then staff will work through the processes to get it back on city council's 997 01:04:28,640 --> 01:04:33,280 agenda for their public hearing. 998 01:04:33,280 --> 01:04:35,520 This is just a calendar so you can visually see. 999 01:04:35,520 --> 01:04:40,640 I know I'm a visual person so you can visually see what this change would do. 1000 01:04:40,640 --> 01:04:41,640 So let's look at August. 1001 01:04:41,640 --> 01:04:45,600 So you look at August 14, you make an original vote. 1002 01:04:45,600 --> 01:04:50,120 Someone on the prevailing side requests to reconsider to the director and that would 1003 01:04:50,120 --> 01:04:54,880 have to be submitted by that Friday on the 16th at 10 a.m. 1004 01:04:54,880 --> 01:04:59,680 So previously you would have had until the 28th, but with this change it will be the 1005 01:04:59,680 --> 01:05:00,680 16th. 1006 01:05:00,680 --> 01:05:08,360 So it's all items, whether it's fast-tracked or not. 1007 01:05:08,360 --> 01:05:09,360 That's the end of my presentation. 1008 01:05:09,360 --> 01:05:11,360 I'm open for questions or comments. 1009 01:05:11,360 --> 01:05:12,360 >> Okay. 1010 01:05:12,360 --> 01:05:14,680 So let's go back to that visual. 1011 01:05:14,680 --> 01:05:15,680 >> Okay. 1012 01:05:15,680 --> 01:05:21,840 >> So what you're saying is the reconsideration any time has to be done on the Friday after 1013 01:05:21,840 --> 01:05:22,840 the meeting. 1014 01:05:22,840 --> 01:05:23,840 Is that? 1015 01:05:23,840 --> 01:05:24,840 >> Yes, ma'am. 1016 01:05:24,840 --> 01:05:30,560 >> That's what -- and so if it would be fast-tracked to the city council meeting the next week, 1017 01:05:30,560 --> 01:05:33,140 that wouldn't even work. 1018 01:05:33,140 --> 01:05:38,120 >> If we're able to receive it by 10 a.m., that gives us time to let the secretary office 1019 01:05:38,120 --> 01:05:39,120 know. 1020 01:05:39,120 --> 01:05:40,120 >> Oh, you would pull it? 1021 01:05:40,120 --> 01:05:41,120 >> Yes. 1022 01:05:41,120 --> 01:05:42,120 >> You would pull it. 1023 01:05:42,120 --> 01:05:43,120 I see. 1024 01:05:43,120 --> 01:05:44,120 Okay. 1025 01:05:44,120 --> 01:05:46,720 >> That fast-track thing is really what we were hoping to balance, but keep going. 1026 01:05:46,720 --> 01:05:47,720 >> Right. 1027 01:05:47,720 --> 01:05:52,320 And so the knowledge of it being a fast-track item, we would know about on that day that 1028 01:05:52,320 --> 01:05:54,360 we would take a vote? 1029 01:05:54,360 --> 01:05:55,360 >> Yes. 1030 01:05:55,360 --> 01:05:56,360 >> Okay. 1031 01:05:56,360 --> 01:05:58,680 Commissioner Villarreal, I think you had your hand up. 1032 01:05:58,680 --> 01:06:00,320 >> Thank you, Chair. 1033 01:06:00,320 --> 01:06:07,160 So I'm a little confused as to why items that aren't fast-tracked also have to be submitted 1034 01:06:07,160 --> 01:06:11,920 on this fast-track basis. 1035 01:06:11,920 --> 01:06:16,000 If they're not considering it at the next council meeting, why do we have to submit 1036 01:06:16,000 --> 01:06:19,800 our reconsideration request a day and a half later? 1037 01:06:19,800 --> 01:06:24,400 I mean, sometimes there are things that come up the week after, there are conversations 1038 01:06:24,400 --> 01:06:30,160 that are had, you know, additional information rises to the surface. 1039 01:06:30,160 --> 01:06:34,280 I'm not sure I'm in favor of having every single reconsideration have to be done by 1040 01:06:34,280 --> 01:06:36,480 the fast-track date and time. 1041 01:06:36,480 --> 01:06:38,760 I understand for fast-track items, of course. 1042 01:06:38,760 --> 01:06:39,760 Thank you. 1043 01:06:39,760 --> 01:06:45,320 >> We were trying to just be consistent and not have two separate calendars of information. 1044 01:06:45,320 --> 01:06:49,200 So that was the reason why we were proposing just to have the one process. 1045 01:06:49,200 --> 01:06:50,200 >> Yeah. 1046 01:06:50,200 --> 01:06:53,320 I mean, Keisha's right. 1047 01:06:53,320 --> 01:06:57,600 We were trying to have a standardized process because also there are some factors that come 1048 01:06:57,600 --> 01:07:02,360 into play, like for example, depending upon when the meetings are scheduled. 1049 01:07:02,360 --> 01:07:08,920 I mean, most of the time we've got a fair amount of advance notice, but it's on our 1050 01:07:08,920 --> 01:07:09,920 meeting dates. 1051 01:07:09,920 --> 01:07:13,800 But we're just -- we struggled through this -- or not, I shouldn't say struggled. 1052 01:07:13,800 --> 01:07:19,540 We discussed this extensively on how best to -- you know, do we have two separate processes 1053 01:07:19,540 --> 01:07:21,080 versus just one? 1054 01:07:21,080 --> 01:07:26,040 We were concerned that trying to come up with two separate processes was -- would be more 1055 01:07:26,040 --> 01:07:27,220 confusing. 1056 01:07:27,220 --> 01:07:34,320 And so hence why we landed on the -- a streamlined process of -- we figured if you had an issue 1057 01:07:34,320 --> 01:07:38,640 with the vote, particularly those that might have been on the prevailing side where you 1058 01:07:38,640 --> 01:07:42,880 believe a reconsideration is necessary, that your gut's probably going to tell you sooner 1059 01:07:42,880 --> 01:07:46,960 than later and that it's going to be on the sooner side. 1060 01:07:46,960 --> 01:07:52,120 Because keep in mind when an item is also being reconsidered, then we're having to process 1061 01:07:52,120 --> 01:07:57,680 it and getting it back on the Planning and Zoning Commission's agenda as soon as we can. 1062 01:07:57,680 --> 01:08:03,480 But the one factor that was challenging for us to be able to work through and hence why 1063 01:08:03,480 --> 01:08:08,600 we landed on where we did was in particular those items that have to be fast-tracked to 1064 01:08:08,600 --> 01:08:09,600 city council. 1065 01:08:09,600 --> 01:08:17,360 And, you know, we even discussed -- you know, the reason why we need to be able to preserve 1066 01:08:17,360 --> 01:08:22,840 being able to move an item to city council faster than the normal three weeks in between 1067 01:08:22,840 --> 01:08:28,440 when it goes to P&Z and council is let's say, for example, we had an error on our part. 1068 01:08:28,440 --> 01:08:33,480 You know, an applicant shouldn't be penalized for an error that staff made. 1069 01:08:33,480 --> 01:08:38,320 We tried to make sure that we don't make those errors, but when it does happen, then we tried 1070 01:08:38,320 --> 01:08:44,440 to be able to make it right by the applicant to be able to get it moved forward. 1071 01:08:44,440 --> 01:08:49,120 You know, if you all feel -- if the concurrence of the commission -- yeah, if the concurrence 1072 01:08:49,120 --> 01:08:53,220 of the commission is that we need to have two separate processes, then we can go back 1073 01:08:53,220 --> 01:08:57,680 and explore that further and see what we can come up with and hopefully not -- and hopefully 1074 01:08:57,680 --> 01:09:02,560 have it a streamlined language that we can put in a proposed draft for your consideration. 1075 01:09:02,560 --> 01:09:05,080 But, you know, open to your thoughts on it. 1076 01:09:05,080 --> 01:09:06,760 That's why we're having this conversation. 1077 01:09:06,760 --> 01:09:07,760 >> Okay. 1078 01:09:07,760 --> 01:09:10,400 Is there anybody else with -- yep. 1079 01:09:10,400 --> 01:09:11,400 Mr. Pruitt. 1080 01:09:11,400 --> 01:09:15,840 >> Thank you, Chair. 1081 01:09:15,840 --> 01:09:22,840 Just a couple of factual questions so I'm not spewing. 1082 01:09:22,840 --> 01:09:33,920 Is there a legal problem to notice a public hearing if a motion to reconsider causes 1083 01:09:33,920 --> 01:09:37,200 that public hearing to not occur? 1084 01:09:37,200 --> 01:09:47,000 >> So we've had some jurisdictional conversation in this -- and, Hillary, feel free to add 1085 01:09:47,000 --> 01:09:51,880 to this, but this was part of the challenge, I think, we ran into last August, right, when 1086 01:09:51,880 --> 01:09:56,760 we had this, is once the commission takes action on an item, you lose jurisdiction on 1087 01:09:56,760 --> 01:09:59,120 it because you've already made a decision. 1088 01:09:59,120 --> 01:10:05,080 So we've -- if we've noticed and we're trying to put it on council's agenda, then we got 1089 01:10:05,080 --> 01:10:10,060 caught in this somewhat of a quandary gray area, whatever you want to call it, in terms 1090 01:10:10,060 --> 01:10:16,280 of who's court is the ball in, right? 1091 01:10:16,280 --> 01:10:19,680 You know, who has the jurisdiction now to consider the item? 1092 01:10:19,680 --> 01:10:23,520 You know, in that particular case, I believe we had already posted it on the council's 1093 01:10:23,520 --> 01:10:26,280 agenda, so it was clearly in the council's court. 1094 01:10:26,280 --> 01:10:31,840 We had also already noticed for the public hearing, so felt it was in council's court 1095 01:10:31,840 --> 01:10:39,660 on that as well, but the fact that the commission had already taken action on the item means 1096 01:10:39,660 --> 01:10:45,800 that your jurisdiction or your ability to act on the item has now -- that window has 1097 01:10:45,800 --> 01:10:46,800 closed. 1098 01:10:46,800 --> 01:10:50,800 But, Hillary, any additional insight to add? 1099 01:10:50,800 --> 01:10:55,480 >> If I may, just add some color so that you're not like, what is he talking about? 1100 01:10:55,480 --> 01:11:01,520 I'm trying to think through Commissioner Villarreal's comment of, hey, that seems kind of short, 1101 01:11:01,520 --> 01:11:06,840 and I'm also thinking in my context of, while I think this is a tool that should be used 1102 01:11:06,840 --> 01:11:19,000 sparingly, I hate the idea of, you know, us causing a minimum of a one-month delay, right? 1103 01:11:19,000 --> 01:11:24,040 Because two weeks later, we vote to reconsider, and then two or three weeks after that, we 1104 01:11:24,040 --> 01:11:25,840 have the original vote, and then it moves forward. 1105 01:11:25,840 --> 01:11:27,760 >> Right, because we have to re-notice. 1106 01:11:27,760 --> 01:11:33,480 And so I'm wondering whether if we have a shortened timeline to reconsider, whether 1107 01:11:33,480 --> 01:11:38,040 that would give us the opportunity to say, hey, look, let's just go ahead and re-notice 1108 01:11:38,040 --> 01:11:43,720 so that in this example, we can vote to reconsider on the 28th and then hold the public hearing 1109 01:11:43,720 --> 01:11:47,680 on the 28th so that it's not as much of a delay that's incurred in that case. 1110 01:11:47,680 --> 01:11:48,680 Does that make sense? 1111 01:11:48,680 --> 01:11:49,680 >> Oh, yeah. 1112 01:11:49,680 --> 01:11:55,220 I think we won't be able to meet our notification requirements. 1113 01:11:55,220 --> 01:11:59,760 So because of when -- >> Because it's more than 12 days. 1114 01:11:59,760 --> 01:12:05,080 >> Right, because it's -- we have to send out notices the day before the 10th day preceding 1115 01:12:05,080 --> 01:12:06,760 the Planning and Zoning Commission meeting. 1116 01:12:06,760 --> 01:12:11,680 So we would not be able to get the noticing accomplished because we've got to be able 1117 01:12:11,680 --> 01:12:17,520 to process our mail notices, you know, one, make sure we can meet the calendar, but then 1118 01:12:17,520 --> 01:12:21,280 two, be able to get our administrative tasks accomplished behind the scenes so we can get 1119 01:12:21,280 --> 01:12:24,000 that all taken care of. 1120 01:12:24,000 --> 01:12:29,920 Next amendments also require noticing to be published in the newspaper. 1121 01:12:29,920 --> 01:12:32,360 So we have lead time that we have to factor in on that. 1122 01:12:32,360 --> 01:12:39,360 So while I appreciate your creativity, we just can't meet the other legal obligations 1123 01:12:39,360 --> 01:12:41,080 that we have to address. 1124 01:12:41,080 --> 01:12:42,080 >> Okay. 1125 01:12:42,080 --> 01:12:43,080 Thank you. 1126 01:12:43,080 --> 01:12:50,200 >> But to your point, reconsideration, when an item is reconsidered, we -- when you vote 1127 01:12:50,200 --> 01:12:58,000 to reconsider an item and if the motion is passed, then we have to go back through the 1128 01:12:58,000 --> 01:13:02,680 public notification process and meet the state statute requirements in order to put it back 1129 01:13:02,680 --> 01:13:04,860 on your agenda for action. 1130 01:13:04,860 --> 01:13:09,320 Because again, you've already taken a preceding action, so you've lost jurisdiction, so we 1131 01:13:09,320 --> 01:13:14,760 have to do the re-noticing to put it legally back in your camp for consideration, if that 1132 01:13:14,760 --> 01:13:15,760 makes sense. 1133 01:13:15,760 --> 01:13:16,760 >> Yeah. 1134 01:13:16,760 --> 01:13:17,760 Thank you. 1135 01:13:17,760 --> 01:13:19,920 >> And that state statute is just -- we have no choice. 1136 01:13:19,920 --> 01:13:20,920 Mr. Cole. 1137 01:13:20,920 --> 01:13:21,920 >> Thank you, Chair. 1138 01:13:21,920 --> 01:13:27,960 Yeah, I was just going through my memory banks of six years and how many reconsiderations 1139 01:13:27,960 --> 01:13:30,120 we've had and I can only think of two. 1140 01:13:30,120 --> 01:13:31,120 >> Two. 1141 01:13:31,120 --> 01:13:32,120 In eight years. 1142 01:13:32,120 --> 01:13:33,120 >> Yeah. 1143 01:13:33,120 --> 01:13:34,120 Right? 1144 01:13:34,120 --> 01:13:40,520 So -- and a day and a half is kind of -- I mean, we do have a right to reconsider and 1145 01:13:40,520 --> 01:13:43,000 it shouldn't just be a day and a half. 1146 01:13:43,000 --> 01:13:44,000 You know what I mean? 1147 01:13:44,000 --> 01:13:51,520 I mean, because if that would have been -- then both the ones -- Chair and I wanted to reconsider 1148 01:13:51,520 --> 01:13:55,440 wouldn't have been done because it was after a day and a half. 1149 01:13:55,440 --> 01:14:07,040 I know mine was, so I -- you know, I don't know, it just -- a day and a half just doesn't 1150 01:14:07,040 --> 01:14:12,720 seem very thorough or -- I mean, because facts on the ground can change and you learn new 1151 01:14:12,720 --> 01:14:19,560 things, you know, it just -- I think it needs to be a little more flexible than that. 1152 01:14:19,560 --> 01:14:29,040 >> Yeah, maybe we need to look at having a true fast track item, you know, date and having 1153 01:14:29,040 --> 01:14:34,040 what the true procedure is because we don't really have -- fast track is not a regular 1154 01:14:34,040 --> 01:14:37,200 thing that we do. 1155 01:14:37,200 --> 01:14:41,120 So it seems like that wouldn't happen as often, so it's almost like we should have what the 1156 01:14:41,120 --> 01:14:48,760 procedure is and then asterisk, if it's a fast track item, this is what it is. 1157 01:14:48,760 --> 01:14:49,760 >> Okay. 1158 01:14:49,760 --> 01:14:50,760 We can definitely look into that. 1159 01:14:50,760 --> 01:14:52,440 That's the concurrence of the group, absolutely. 1160 01:14:52,440 --> 01:14:54,240 >> And then this -- you're bringing this back. 1161 01:14:54,240 --> 01:14:58,360 Is this something we would have to -- >> This is a code amendment, so -- 1162 01:14:58,360 --> 01:15:03,560 >> So this would require public hearing, yeah, that's what I figured. 1163 01:15:03,560 --> 01:15:04,560 Okay. 1164 01:15:04,560 --> 01:15:05,560 Yeah. 1165 01:15:05,560 --> 01:15:11,080 Yeah, so maybe look at that and maybe, yeah, send it out again or press the look at or 1166 01:15:11,080 --> 01:15:12,080 -- 1167 01:15:12,080 --> 01:15:13,080 >> Sure thing. 1168 01:15:13,080 --> 01:15:14,080 >> Well, I mean, I guess it would be -- it would be in the backup. 1169 01:15:14,080 --> 01:15:15,080 >> It will be in the backup material. 1170 01:15:15,080 --> 01:15:16,080 >> Yeah, sorry. 1171 01:15:16,080 --> 01:15:17,080 >> So it would be in your normal packet. 1172 01:15:17,080 --> 01:15:18,080 >> Yeah. 1173 01:15:18,080 --> 01:15:20,840 >> I know the other item is a little more complicated, but if we have the ability to 1174 01:15:20,840 --> 01:15:23,360 get you something in advance, we'll try. 1175 01:15:23,360 --> 01:15:25,440 >> Is that good direction? 1176 01:15:25,440 --> 01:15:27,800 Is that anything -- okay. 1177 01:15:27,800 --> 01:15:30,880 Kiesha, thank you. 1178 01:15:30,880 --> 01:15:32,280 Okay. 1179 01:15:32,280 --> 01:15:38,640 That concludes our work session, so we'll go ahead and adjourn at 616 and reconvene as 1180 01:15:38,640 --> 01:15:46,120 close to 630 as possible in Council Chambers. 1181 01:15:46,120 --> 01:15:49,400 >> Good evening, and welcome to the City of Denton's Planning and Zoning Commission meeting 1182 01:15:49,400 --> 01:15:53,000 for Wednesday, June 12, 2024. 1183 01:15:53,000 --> 01:15:58,000 With the quorum present, I will call us to order at 642 p.m. 1184 01:15:58,000 --> 01:16:00,120 Thank you for your patience. 1185 01:16:00,120 --> 01:16:15,200 Our first item on our agenda is Pledge of Allegiance to the U.S. and Texas Flags. 1186 01:16:15,200 --> 01:16:32,260 Thank you. 1187 01:16:32,260 --> 01:16:37,960 Our next item is to consider the approval of our Planning and Zoning minutes from May 1188 01:16:37,960 --> 01:16:39,320 29th. 1189 01:16:39,320 --> 01:16:40,320 Commissioner Villarreal. 1190 01:16:40,320 --> 01:16:41,800 >> Move approval. 1191 01:16:41,800 --> 01:16:42,800 >> Commissioner Thaggard. 1192 01:16:42,800 --> 01:16:43,800 >> Second. 1193 01:16:43,800 --> 01:16:45,620 >> Got a first and a second for approval. 1194 01:16:45,620 --> 01:16:46,620 Any discussion? 1195 01:16:46,620 --> 01:16:47,620 Okay. 1196 01:16:47,620 --> 01:16:56,720 Let's go ahead and vote on the board, please. 1197 01:16:56,720 --> 01:16:58,200 That motion carries 6-0. 1198 01:16:58,200 --> 01:17:02,280 That'll take us to our Consent Agenda this evening. 1199 01:17:02,280 --> 01:17:03,280 Commissioner Villarreal. 1200 01:17:03,280 --> 01:17:04,680 >> Move approval. 1201 01:17:04,680 --> 01:17:05,680 >> Commissioner Thaggard. 1202 01:17:05,680 --> 01:17:06,680 >> Second. 1203 01:17:06,680 --> 01:17:10,400 >> Got a first and a second for approval of the Consent Agenda discussion. 1204 01:17:10,400 --> 01:17:18,860 Let's vote, please. 1205 01:17:18,860 --> 01:17:20,960 That motion carries 6-0. 1206 01:17:20,960 --> 01:17:24,860 That will move us into our items for individual consideration. 1207 01:17:24,860 --> 01:17:31,180 And let me pause here just for a moment in case there's anyone in the audience or listening 1208 01:17:31,180 --> 01:17:38,960 that are here for public hearing items 5B and C. That is the zoning change with regard 1209 01:17:38,960 --> 01:17:41,040 to Corbin Road. 1210 01:17:41,040 --> 01:17:46,440 That is going to be postponed and we won't be taking action on that item today. 1211 01:17:46,440 --> 01:17:50,840 So I just wanted to make sure everybody has a heads up ahead of time, 5B and 5C will not 1212 01:17:50,840 --> 01:17:53,360 be heard today. 1213 01:17:53,360 --> 01:17:58,200 So our first item for individual consideration is 4A, FP240011. 1214 01:17:58,200 --> 01:18:01,600 Angie is here for presentation. 1215 01:18:01,600 --> 01:18:02,600 Hi. 1216 01:18:02,600 --> 01:18:06,120 >> Good evening, Chair, members of the Commission. 1217 01:18:06,120 --> 01:18:08,940 Angie Mangleris, Development Review Manager. 1218 01:18:08,940 --> 01:18:12,040 This is FP240011B. 1219 01:18:12,040 --> 01:18:14,400 This is a final plan for Stella Hills Phase 1. 1220 01:18:14,400 --> 01:18:19,640 It is located just south of McKinney Street where McKinney Street and Laney Circle intersect. 1221 01:18:19,640 --> 01:18:24,760 There's approximately 177 single family lots and four open space lots. 1222 01:18:24,760 --> 01:18:26,520 The zoning is R6. 1223 01:18:26,520 --> 01:18:29,480 At the time the packet went out, they did not meet all the criteria for approval. 1224 01:18:29,480 --> 01:18:33,240 However, the plot does now satisfy all of our criteria and staff as recommending approval 1225 01:18:33,240 --> 01:18:34,360 of the plot as presented. 1226 01:18:34,360 --> 01:18:36,000 Happy to answer any questions. 1227 01:18:36,000 --> 01:18:37,000 >> Thank you, Angie. 1228 01:18:37,000 --> 01:18:40,160 >> Any questions for Angie? 1229 01:18:40,160 --> 01:18:45,160 Thank you. 1230 01:18:45,160 --> 01:18:52,160 Chair can entertain a motion or discussion at this time. 1231 01:18:52,160 --> 01:18:56,440 I will move approval of that item. 1232 01:18:56,440 --> 01:18:57,440 Vice Chair approve it. 1233 01:18:57,440 --> 01:18:58,440 >> Second. 1234 01:18:58,440 --> 01:18:59,440 >> Okay. 1235 01:18:59,440 --> 01:19:00,440 We've got a first and a second for approval. 1236 01:19:00,440 --> 01:19:01,440 Is there any discussion? 1237 01:19:01,440 --> 01:19:02,440 Okay. 1238 01:19:02,440 --> 01:19:08,520 Let's vote, please. 1239 01:19:08,520 --> 01:19:10,400 That motion carries 6-0. 1240 01:19:10,400 --> 01:19:15,720 That takes us to 4B, FP240020. 1241 01:19:15,720 --> 01:19:17,120 Bryce is here for that item. 1242 01:19:17,120 --> 01:19:18,120 Hello. 1243 01:19:18,120 --> 01:19:21,440 >> Good evening, Chair, members of the commission, Bryce Van Arsdale, Assistant Planner. 1244 01:19:21,440 --> 01:19:27,680 This is a final plot for approximately 15.98 acres on the southeast corner of the intersection 1245 01:19:27,680 --> 01:19:30,820 of Copper Canyon Road and Old Alton Road. 1246 01:19:30,820 --> 01:19:34,360 This plot will create one single lot, and while it does not meet our current criteria 1247 01:19:34,360 --> 01:19:38,880 for approval, staff has no objection to the requested extension date certain to a date 1248 01:19:38,880 --> 01:19:40,720 certain of June 26th, 2024. 1249 01:19:40,720 --> 01:19:42,920 I'll stand for any questions. 1250 01:19:42,920 --> 01:19:43,920 >> Thank you, Bryce. 1251 01:19:43,920 --> 01:19:45,920 I do not see any questions. 1252 01:19:45,920 --> 01:19:47,280 Appreciate it. 1253 01:19:47,280 --> 01:19:48,280 Commissioner Villarreal. 1254 01:19:48,280 --> 01:19:53,840 >> Move approval of the extension request to a date certain of June 26th, 2024. 1255 01:19:53,840 --> 01:19:54,840 >> Thank you. 1256 01:19:54,840 --> 01:19:55,840 Commissioner Thaggard? 1257 01:19:55,840 --> 01:19:56,840 >> Second. 1258 01:19:56,840 --> 01:20:03,720 >> Second to grant the extension request to a date certain of June 26th, 2024. 1259 01:20:03,720 --> 01:20:04,720 Any discussion? 1260 01:20:04,720 --> 01:20:05,720 Okay. 1261 01:20:05,720 --> 01:20:14,000 Let's go ahead and vote, please. 1262 01:20:14,000 --> 01:20:17,160 That motion carries 6-0. 1263 01:20:17,160 --> 01:20:21,680 The next four items, Commissioner Cole is going to recuse himself, so I'm going to let 1264 01:20:21,680 --> 01:20:24,120 him leave the dais. 1265 01:20:24,120 --> 01:20:31,020 And then Cameron is here for the first one of 4CFP240012. 1266 01:20:31,020 --> 01:20:34,620 >> Thank you, Chair and Commission, Cameron Robertson, principal planner. 1267 01:20:34,620 --> 01:20:38,480 This is a final plot for Hunter Ranch Phase 1A. 1268 01:20:38,480 --> 01:20:45,120 It's for approximately 53 acres, located just north of Robeson Ranch Road and west of Interstate 1269 01:20:45,120 --> 01:20:46,800 35 West. 1270 01:20:46,800 --> 01:20:53,080 It is to consist of 95 single-family residential lots as well as 10 HOA lots. 1271 01:20:53,080 --> 01:20:57,440 Staff is recommending denial at this time, but staff has no objection to the second extension 1272 01:20:57,440 --> 01:21:03,600 request date certain of June 26th, 2024, and I can stand for any questions. 1273 01:21:03,600 --> 01:21:04,600 >> Thank you. 1274 01:21:04,600 --> 01:21:06,200 I do not see any questions. 1275 01:21:06,200 --> 01:21:07,200 Commissioner Villarreal? 1276 01:21:07,200 --> 01:21:11,320 >> Move approval of the extension request to a date certain of June 26th, 2024. 1277 01:21:11,320 --> 01:21:12,320 >> Okay. 1278 01:21:12,320 --> 01:21:13,320 Thank you. 1279 01:21:13,320 --> 01:21:14,320 Commissioner Thaggard? 1280 01:21:14,320 --> 01:21:15,320 >> Second. 1281 01:21:15,320 --> 01:21:18,080 >> We've got a first and a second to grant the extension request to a date certain of 1282 01:21:18,080 --> 01:21:21,640 June 26th, 2024. 1283 01:21:21,640 --> 01:21:32,800 Seeing no discussion, let's vote, please. 1284 01:21:32,800 --> 01:21:37,200 That motion carries 5-0. 1285 01:21:37,200 --> 01:21:43,600 Next item is 4DFP240013. 1286 01:21:43,600 --> 01:21:45,320 >> Thank you so much, Chair and Commission. 1287 01:21:45,320 --> 01:21:47,600 This is for Hunter Ranch Phase 1B. 1288 01:21:47,600 --> 01:21:53,480 It's approximately 50-acre site, it would consist of 180 single-family residential lots 1289 01:21:53,480 --> 01:21:55,640 and 8 HOA lots. 1290 01:21:55,640 --> 01:21:59,480 Staff is recommending denial at this time, but staff has no objection to the second extension 1291 01:21:59,480 --> 01:22:03,600 request to a date certain of June 26th, 2024, and I can stand for any questions. 1292 01:22:03,600 --> 01:22:05,640 >> Thanks, Cameron. 1293 01:22:05,640 --> 01:22:06,960 I do not see any questions. 1294 01:22:06,960 --> 01:22:08,440 Thank you very much. 1295 01:22:08,440 --> 01:22:09,440 Commissioner Villarreal? 1296 01:22:09,440 --> 01:22:13,880 >> Move approval of the extension request to a date certain of June 26th, 2024. 1297 01:22:13,880 --> 01:22:14,880 >> Thank you. 1298 01:22:14,880 --> 01:22:15,880 Commissioner Perot? 1299 01:22:15,880 --> 01:22:16,880 >> Second. 1300 01:22:16,880 --> 01:22:20,160 >> Okay, we've got a first and a second to grant the extension request to a date certain 1301 01:22:20,160 --> 01:22:23,600 of June 26th, 2024. 1302 01:22:23,600 --> 01:22:32,800 Let's go ahead and vote, please. 1303 01:22:32,800 --> 01:22:34,280 That motion carries 5-0. 1304 01:22:34,280 --> 01:22:40,600 That'll take us to 4EFP240014. 1305 01:22:40,600 --> 01:22:41,600 >> Thank you so much. 1306 01:22:41,600 --> 01:22:44,120 This is for our final plot for Hunter Ranch Phase 1C. 1307 01:22:44,120 --> 01:22:51,120 It's for approximately 68-acre site to consist of 287 single-family residential lots and 10 1308 01:22:51,120 --> 01:22:52,240 HOA lots. 1309 01:22:52,240 --> 01:22:56,200 Staff is recommending denial at this time, but staff has no objection to the second extension 1310 01:22:56,200 --> 01:23:00,160 request to a date certain of June 26th, 2024, and I can stand for any questions. 1311 01:23:00,160 --> 01:23:01,160 >> Thanks, Cameron. 1312 01:23:01,160 --> 01:23:03,820 I do not see any questions. 1313 01:23:03,820 --> 01:23:04,820 Thank you. 1314 01:23:04,820 --> 01:23:05,820 Commissioner Villarreal? 1315 01:23:05,820 --> 01:23:10,440 >> Move approval of the extension request to a date certain of June 26th, 2024. 1316 01:23:10,440 --> 01:23:11,440 >> Commissioner Thaggard? 1317 01:23:11,440 --> 01:23:12,440 >> Second. 1318 01:23:12,440 --> 01:23:18,280 >> Okay, first and a second to grant the extension request to a date certain of June 26th, 2024. 1319 01:23:18,280 --> 01:23:26,000 Let's go ahead and vote, please. 1320 01:23:26,000 --> 01:23:27,760 That motion carries 5-0. 1321 01:23:27,760 --> 01:23:32,920 That will take us to 4FFP240015. 1322 01:23:32,920 --> 01:23:33,920 >> Thank you. 1323 01:23:33,920 --> 01:23:36,080 This is a final plot for Hunter Ranch Phase 1D. 1324 01:23:36,080 --> 01:23:37,960 It's approximately 50-acre site. 1325 01:23:37,960 --> 01:23:43,400 I'm consisting of 185 single-family residential lots and 8 HOA lots. 1326 01:23:43,400 --> 01:23:47,600 Staff is recommending denial at this time, but staff has no objection to the second extension 1327 01:23:47,600 --> 01:23:53,600 request date to a date certain of June 26th, 2024, and I can stand for any questions. 1328 01:23:53,600 --> 01:23:54,600 >> Thank you. 1329 01:23:54,600 --> 01:24:01,860 I do not see any -- thank you so much, Cameron. 1330 01:24:01,860 --> 01:24:02,860 Commissioner Villarreal? 1331 01:24:02,860 --> 01:24:07,320 >> Move approval of the extension request to a date certain of June 26th, 2024. 1332 01:24:07,320 --> 01:24:08,320 >> Thank you. 1333 01:24:08,320 --> 01:24:09,320 Commissioner Thaggard? 1334 01:24:09,320 --> 01:24:10,320 >> Second. 1335 01:24:10,320 --> 01:24:13,160 >> We've got a first and a second to approve the extension request to a date certain of 1336 01:24:13,160 --> 01:24:16,840 June 26th, 2024. 1337 01:24:16,840 --> 01:24:24,240 Let's go ahead and vote, please. 1338 01:24:24,240 --> 01:24:26,880 That motion carries 5-0. 1339 01:24:26,880 --> 01:24:34,120 We'll let Commissioner Cole enter back in, and I will call Item 5A of our public hearings 1340 01:24:34,120 --> 01:24:37,120 as PD240005. 1341 01:24:37,120 --> 01:24:41,560 I'll open the public hearing, and Mia is here for presentation. 1342 01:24:41,560 --> 01:24:50,080 >> Good evening, Chair, members of the commission. 1343 01:24:50,080 --> 01:24:56,760 Mia Hines, senior planner, and this item is a PD24-0005. 1344 01:24:56,760 --> 01:25:03,760 The request is to rezone approximately 52 1/2 acres from R6 to PDLI, which is an overlay 1345 01:25:03,760 --> 01:25:06,520 PD with a light industrial-based zoning. 1346 01:25:06,520 --> 01:25:12,640 The request or the subject site is a part of a larger 86-acre site, and I've highlighted 1347 01:25:12,640 --> 01:25:17,640 that here in yellow on your screen, so you can see that that site is -- or the subject 1348 01:25:17,640 --> 01:25:22,840 property is a part of that larger site, which has access off of Black, Geesling, and also 1349 01:25:22,840 --> 01:25:24,680 touches US380. 1350 01:25:24,680 --> 01:25:27,440 The request would establish a light industrial zoning. 1351 01:25:27,440 --> 01:25:31,680 It would require ESA compliance at zoning compliance plan review. 1352 01:25:31,680 --> 01:25:36,060 It would also require a 250-foot building setback from residential properties and Black 1353 01:25:36,060 --> 01:25:37,060 Road. 1354 01:25:37,060 --> 01:25:42,960 It would require a 50-foot wide landscape buffer from -- with 50 buffer points from 1355 01:25:42,960 --> 01:25:46,200 -- adjacent to the residential properties and Black Road. 1356 01:25:46,200 --> 01:25:52,440 It would also restrict truck traffic access onto Black Road from any driveways that are 1357 01:25:52,440 --> 01:25:54,840 proposed as a part of future developments. 1358 01:25:54,840 --> 01:25:59,200 It also would prohibit automotive fuel cells and major auto repair, and I do apologize, 1359 01:25:59,200 --> 01:26:00,200 there is one more. 1360 01:26:00,200 --> 01:26:05,200 It limits the building height for structures within this PD to 55 feet as opposed to the 1361 01:26:05,200 --> 01:26:10,840 75 feet that is allowed in our -- or currently permitted in our light industrial zoning district. 1362 01:26:10,840 --> 01:26:16,680 So just to give you a broad overview, this is a PD overlay, and our code does allow for 1363 01:26:16,680 --> 01:26:20,080 applicants to apply for an overlay PD and a standard PD. 1364 01:26:20,080 --> 01:26:24,480 The standard PD usually comes with a development plan, and it's usually utilized when an applicant 1365 01:26:24,480 --> 01:26:28,960 or property owner has a more fleshed-out idea of their development. 1366 01:26:28,960 --> 01:26:34,280 In this case, they are wanting to get their zoning title to be consistent with the rest 1367 01:26:34,280 --> 01:26:38,800 of the property and be able to develop and come forward through our development processes 1368 01:26:38,800 --> 01:26:40,680 at a later time. 1369 01:26:40,680 --> 01:26:44,160 So this is an overlay PD as opposed to a standard PD. 1370 01:26:44,160 --> 01:26:47,960 So we did, of course, put this up against our criteria for approval, and I'll get into 1371 01:26:47,960 --> 01:26:49,800 those points here in a second. 1372 01:26:49,800 --> 01:26:54,400 Just highlights, the new PD would be -- is compliant with our criteria for approval. 1373 01:26:54,400 --> 01:26:59,520 It would be subject to the LI development standards of our current development code, 1374 01:26:59,520 --> 01:27:04,960 and as amended, it would require ESA compliance at zoning compliance plan, whereas we're most 1375 01:27:04,960 --> 01:27:11,800 usually flexible with that for -- sometimes it's deferred to CEPs or later in the process, 1376 01:27:11,800 --> 01:27:16,080 but this requires them to have those answers ahead of time. 1377 01:27:16,080 --> 01:27:21,080 The proposed PD builds in additional buffers to minimize adverse impacts on the surrounding 1378 01:27:21,080 --> 01:27:22,640 less intense uses. 1379 01:27:22,640 --> 01:27:27,560 Additionally, light industrial flume designation is intended to allow for development of light 1380 01:27:27,560 --> 01:27:32,320 manufacturing and assembling in warehouses on these tracks, and that is the future land 1381 01:27:32,320 --> 01:27:34,440 use designation on this property. 1382 01:27:34,440 --> 01:27:38,880 There's also an overlay or an overlap of a little bit of low residential future land use 1383 01:27:38,880 --> 01:27:44,080 that map designation on this property, and this PD does take that into consideration. 1384 01:27:44,080 --> 01:27:47,600 Specifically in those areas, like I said, adjacent to the residential zoning district, and this 1385 01:27:47,600 --> 01:27:54,000 is just that future land use map that shows that light industrial future land use on the 1386 01:27:54,000 --> 01:27:59,840 majority of the property with a low residential overlap along the fringes there, and again, 1387 01:27:59,840 --> 01:28:06,160 where the applicant is proposing those overlay buffers, that is within that area. 1388 01:28:06,160 --> 01:28:12,280 So the proposed PD development standards, like I said, include a minimum side yard setback 1389 01:28:12,280 --> 01:28:16,720 compared to the existing light industrial zoning district, where we would only require 1390 01:28:16,720 --> 01:28:20,760 a minimum five foot building setback under LI. 1391 01:28:20,760 --> 01:28:25,800 The proposed ... This development would ... Or any subsequent developments would have to respect 1392 01:28:25,800 --> 01:28:32,720 the 250 foot residential ... I'm sorry, building setback from those residential properties. 1393 01:28:32,720 --> 01:28:38,400 Additionally, as far as land use compatibility buffers, we do require in our current DDC 1394 01:28:38,400 --> 01:28:44,080 a minimum of 30 feet landscape buffer with 50 points from DDC table 7.E, and this of 1395 01:28:44,080 --> 01:28:48,800 course increases that requirement to a minimum of 50 feet. 1396 01:28:48,800 --> 01:28:54,480 Again, ESA compliance plan review comes at the zoning compliance plan stage, and permitted 1397 01:28:54,480 --> 01:28:59,000 uses where the LI district does permit ... I'm sorry, the base LI zoning district would of 1398 01:28:59,000 --> 01:29:03,240 course permit all of those permitted uses that are listed in our table of allowed uses 1399 01:29:03,240 --> 01:29:05,480 under LI. 1400 01:29:05,480 --> 01:29:12,520 This overlay district does prohibit automotive fuel sales and major auto repair. 1401 01:29:12,520 --> 01:29:17,820 So those uses, whereas they would be allowed under regular LI, would not be allowed within 1402 01:29:17,820 --> 01:29:21,880 this portion of the PD. 1403 01:29:21,880 --> 01:29:25,440 Since it was discussed in work session, I did add the definition of those prohibited 1404 01:29:25,440 --> 01:29:26,440 uses. 1405 01:29:26,440 --> 01:29:32,080 Automotive repair major is an establishment engaged in providing major automotive repair 1406 01:29:32,080 --> 01:29:37,360 services such as engine and drive train repair, body work, mechanical services, and painting. 1407 01:29:37,360 --> 01:29:42,440 So when those items that are highlighted there, the engine, drive train, repair, body work, 1408 01:29:42,440 --> 01:29:46,760 mechanical servicing, and/or painting, when those come into the equation, it's considered 1409 01:29:46,760 --> 01:29:48,920 major auto repair. 1410 01:29:48,920 --> 01:29:56,160 As far as access and circulation, that stipulation is written there, and again, the purpose or 1411 01:29:56,160 --> 01:30:02,920 the intent behind this requirement or this addition to the PD is to restrict truck traffic 1412 01:30:02,920 --> 01:30:07,280 from Black Road given the existing residences, the existing condition of that road. 1413 01:30:07,280 --> 01:30:12,400 We felt that if that was possible, we could limit some potential conflicts in vehicular 1414 01:30:12,400 --> 01:30:14,400 traffic there. 1415 01:30:14,400 --> 01:30:18,800 We did perform public outreach per our development code. 1416 01:30:18,800 --> 01:30:24,960 We did receive two letters in opposition expressing concerns of drainage and land use compatibility. 1417 01:30:24,960 --> 01:30:26,880 Sorry about that. 1418 01:30:26,880 --> 01:30:32,920 That equates to just over 11% in opposition for those curious about the supermajority 1419 01:30:32,920 --> 01:30:35,920 requirement at council. 1420 01:30:35,920 --> 01:30:41,840 The applicant did perform a few neighborhood meetings which they are here and could potentially 1421 01:30:41,840 --> 01:30:44,720 speak to as well. 1422 01:30:44,720 --> 01:30:48,800 So with that, staff is recommending approval of this request as it complies with the criteria 1423 01:30:48,800 --> 01:30:54,480 for approval in our DDC, and I will take any questions or comments that you have at this 1424 01:30:54,480 --> 01:30:55,480 time. 1425 01:30:55,480 --> 01:30:56,480 Thank you very much, Mia. 1426 01:30:56,480 --> 01:30:58,520 Anybody have any questions? 1427 01:30:58,520 --> 01:31:04,120 Mia, my question that I couldn't come up with in work session with regarding to that verbiage, 1428 01:31:04,120 --> 01:31:12,540 which I like, but it talks about having signage on the property, like do not exit. 1429 01:31:12,540 --> 01:31:15,240 What about entering the driveway on Black? 1430 01:31:15,240 --> 01:31:22,880 I mean, ideally we don't want truck -- I mean, prefer not to have truck traffic on Black. 1431 01:31:22,880 --> 01:31:29,640 So if we've got an internal sign saying, okay, do not exit, what's keeping them from entering? 1432 01:31:29,640 --> 01:31:30,920 So we could add that restriction. 1433 01:31:30,920 --> 01:31:35,740 I think the goal here was tried -- because this is the use or the warehouse use would 1434 01:31:35,740 --> 01:31:43,800 be on this property, the goal was to try to permit -- prevent, rather, the truck traffic 1435 01:31:43,800 --> 01:31:49,000 that would be using this property from going on to Black Road, but I think that that could 1436 01:31:49,000 --> 01:31:53,680 be a condition that we could add also to add that signage outside so that trucks traveling 1437 01:31:53,680 --> 01:31:58,360 from outside into the property would know not to use that also, but at that point they 1438 01:31:58,360 --> 01:31:59,840 would already be on Black Road. 1439 01:31:59,840 --> 01:32:00,840 That's true. 1440 01:32:00,840 --> 01:32:01,840 Yeah. 1441 01:32:01,840 --> 01:32:02,840 I'm not sure the best way to do that. 1442 01:32:02,840 --> 01:32:03,840 Okay. 1443 01:32:03,840 --> 01:32:04,840 That's just my brain working. 1444 01:32:04,840 --> 01:32:05,840 Go ahead, Tina. 1445 01:32:05,840 --> 01:32:06,840 Yeah. 1446 01:32:06,840 --> 01:32:07,840 Thank you. 1447 01:32:07,840 --> 01:32:12,080 One of the things that we could look at, if that's desired by the commission, we could 1448 01:32:12,080 --> 01:32:15,880 -- between the Planning and Zoning Commission meeting, if you were to approve this this evening 1449 01:32:15,880 --> 01:32:20,880 or recommend approval, excuse me, between now and when it goes to council next week, 1450 01:32:20,880 --> 01:32:26,560 we could talk to our transportation services team to see if there is any value to possibly 1451 01:32:26,560 --> 01:32:32,320 limiting truck traffic on that portion of Black Road, if that's a concern of the commission. 1452 01:32:32,320 --> 01:32:34,320 If not, you know, just tell us. 1453 01:32:34,320 --> 01:32:36,320 With just, like, signage, you mean? 1454 01:32:36,320 --> 01:32:41,200 Well, we'd have to look at probably from intersection to intersection, and in all likelihood it's 1455 01:32:41,200 --> 01:32:45,560 from a major, you know, a more prominent intersection to a more prominent intersection to be able 1456 01:32:45,560 --> 01:32:50,880 to look at whether or not prohibiting -- in order for us to prevent trucks from entering 1457 01:32:50,880 --> 01:32:51,880 the site. 1458 01:32:51,880 --> 01:32:55,040 I mean, we could have them post a sign, but if the truck is already on Black Road, it's 1459 01:32:55,040 --> 01:32:56,440 already on Black Road, right? 1460 01:32:56,440 --> 01:33:03,480 So that's why I said, yeah, we'd have to evaluate a larger section of it, but again, just whatever 1461 01:33:03,480 --> 01:33:04,480 the commission's desire is. 1462 01:33:04,480 --> 01:33:05,480 I keep thinking about that. 1463 01:33:05,480 --> 01:33:06,480 Okay. 1464 01:33:06,480 --> 01:33:07,480 And thank you, Tina. 1465 01:33:07,480 --> 01:33:09,360 I did fail to mention that this is one of those cases that is being fast-tracked. 1466 01:33:09,360 --> 01:33:13,520 It will be on City Council agenda or plans for City Council agenda next week. 1467 01:33:13,520 --> 01:33:14,520 Okay. 1468 01:33:14,520 --> 01:33:15,520 Thank you for that. 1469 01:33:15,520 --> 01:33:16,520 Okay. 1470 01:33:16,520 --> 01:33:18,280 Appreciate it. 1471 01:33:18,280 --> 01:33:19,280 This is a public hearing. 1472 01:33:19,280 --> 01:33:23,920 I have one card at the moment to speak, and it is the applicant, and it is Amy Bissett. 1473 01:33:23,920 --> 01:33:26,960 I will invite her up to speak. 1474 01:33:26,960 --> 01:33:27,960 Hello. 1475 01:33:27,960 --> 01:33:28,960 Hello. 1476 01:33:28,960 --> 01:33:29,960 Thank you. 1477 01:33:29,960 --> 01:33:30,960 Thank you, Mia. 1478 01:33:30,960 --> 01:33:34,600 Good evening, Commissioners and Chair Ellis. 1479 01:33:34,600 --> 01:33:37,360 I appreciate the opportunity to be in front of you this evening. 1480 01:33:37,360 --> 01:33:40,480 If I can get my slides to work, that would be great. 1481 01:33:40,480 --> 01:33:41,480 There we go. 1482 01:33:41,480 --> 01:33:46,480 I do want to start by saying that I did watch the work session, and I'm going to address 1483 01:33:46,480 --> 01:33:49,120 some of those questions in my presentation tonight. 1484 01:33:49,120 --> 01:33:56,440 And in a little bit of irony, the property owner, my client, is going to be here tonight, 1485 01:33:56,440 --> 01:34:02,760 but he's currently stuck in traffic on 380, so he should be walking in any minute now. 1486 01:34:02,760 --> 01:34:08,400 But speaking of the property owner, I do want to share anecdotally that Mr. Walker and Mr. 1487 01:34:08,400 --> 01:34:12,520 Martin, who own this property today, have owned it for nearly 40 years now. 1488 01:34:12,520 --> 01:34:18,500 They bought it in 1986 with the intent to develop it residentially, and have had a tremendous 1489 01:34:18,500 --> 01:34:25,200 number of problems with the site, with the number of utilities that bisect the site. 1490 01:34:25,200 --> 01:34:32,500 And it's just over the course of the years, the nature of 380 and the location have changed 1491 01:34:32,500 --> 01:34:39,760 to where the suitability for residential has not improved during their time of ownership. 1492 01:34:39,760 --> 01:34:41,200 And just thought I would share that. 1493 01:34:41,200 --> 01:34:47,360 So this is the entire property you can see here, a portion of the property. 1494 01:34:47,360 --> 01:34:49,040 This is the zoning map today. 1495 01:34:49,040 --> 01:34:53,000 The northwest portion of the property was actually rezoned in 2021, some of you may 1496 01:34:53,000 --> 01:34:59,440 remember that, to facilitate a project that ultimately did not materialize. 1497 01:34:59,440 --> 01:35:04,560 The current property owners, Mr. Walker and Mr. Martin, are seeking to market the property 1498 01:35:04,560 --> 01:35:05,760 for sale. 1499 01:35:05,760 --> 01:35:12,640 They've had multiple developers interested since 2021, but just the number of challenges 1500 01:35:12,640 --> 01:35:19,160 associated with it, and the fact that it's split zoning today, has caused them to seek 1501 01:35:19,160 --> 01:35:23,160 out an attempt to rezone it ahead of a sale. 1502 01:35:23,160 --> 01:35:28,680 The site does include electric transmission lines, an Atmos gas pipeline, and is adjacent 1503 01:35:28,680 --> 01:35:34,080 to a substation, which are some of the challenges associated with it. 1504 01:35:34,080 --> 01:35:39,960 I won't capture this again, but it is, future land use is mostly light industrial, but we 1505 01:35:39,960 --> 01:35:45,920 are attempting to be respectful of the adjacency of low residential as well. 1506 01:35:45,920 --> 01:35:49,640 The initial conditions that we proposed when we submitted the zoning application were an 1507 01:35:49,640 --> 01:35:55,160 increased building setback along the eastern property line specifically, and then the ESA 1508 01:35:55,160 --> 01:35:57,600 field assessment requirement. 1509 01:35:57,600 --> 01:36:00,600 We then went into neighborhood engagement. 1510 01:36:00,600 --> 01:36:06,120 We held two virtual meetings in May, and the neighbors indicated that they wanted to meet 1511 01:36:06,120 --> 01:36:10,140 amongst themselves, and many of them are here tonight, which I very much appreciate. 1512 01:36:10,140 --> 01:36:13,080 They've been a pleasure to work with. 1513 01:36:13,080 --> 01:36:17,320 And then they followed up with us and asked for some additional conversation. 1514 01:36:17,320 --> 01:36:21,800 We had a follow-up meeting on June 7th with a couple of the neighbors specifically related 1515 01:36:21,800 --> 01:36:23,600 to issues on Black Road. 1516 01:36:23,600 --> 01:36:28,840 And then I had an additional discussion last night with a neighborhood representative making 1517 01:36:28,840 --> 01:36:33,940 some additional requests, so we'll kind of walk through what some of those are that we've 1518 01:36:33,940 --> 01:36:38,680 addressed within the conditions today, and some that you could potentially put additional 1519 01:36:38,680 --> 01:36:41,600 conditions on tonight. 1520 01:36:41,600 --> 01:36:46,340 So here's a highlighted map of the property owners that I know I've personally spoken 1521 01:36:46,340 --> 01:36:47,340 with. 1522 01:36:47,340 --> 01:36:50,080 I know there's some here this evening that are not highlighted here, but I just wanted 1523 01:36:50,080 --> 01:36:54,640 you to see that we have really tried to have a good representation of the residential property 1524 01:36:54,640 --> 01:36:57,640 owners in the area. 1525 01:36:57,640 --> 01:37:05,040 So the neighborhood requests and the additional conditions that we've agreed to, as Mia mentioned, 1526 01:37:05,040 --> 01:37:11,880 now the setback and the landscape buffer encompass the entire area highlighted in yellow here. 1527 01:37:11,880 --> 01:37:16,440 We've reduced the maximum building height from 75 feet to 55 feet. 1528 01:37:16,440 --> 01:37:18,360 We had originally agreed to 60 feet. 1529 01:37:18,360 --> 01:37:20,220 The neighborhood was asking for 50. 1530 01:37:20,220 --> 01:37:27,440 I did a quick analysis on recent industrial project heights, and 55 seemed to be the max, 1531 01:37:27,440 --> 01:37:37,200 and without putting a limitation on a potential buyer, we felt like 55 was reasonable to kind 1532 01:37:37,200 --> 01:37:41,700 of meet in the middle and still not limit potential developers. 1533 01:37:41,700 --> 01:37:45,960 We have also agreed to restrict Black Road to no truck traffic and employee entrance 1534 01:37:45,960 --> 01:37:52,080 only to your question, Chair Ellis, about how do you keep them from coming onto Black Road. 1535 01:37:52,080 --> 01:37:56,920 We've handled this in a couple of different cases in the past on zoning cases where we 1536 01:37:56,920 --> 01:38:02,440 wanted truck traffic to go into a particular location and not others, and depending on 1537 01:38:02,440 --> 01:38:07,720 the developer, they can certainly configure the site to discourage that. 1538 01:38:07,720 --> 01:38:10,840 Trucks really want the easiest way in and out to start with, and so if they make it 1539 01:38:10,840 --> 01:38:15,780 more difficult, that helps with that, but I agree that a conversation with transportation 1540 01:38:15,780 --> 01:38:19,280 would be helpful between now and when we go to city council. 1541 01:38:19,280 --> 01:38:23,600 We have agreed to prohibit major auto repair and fueling stations. 1542 01:38:23,600 --> 01:38:28,400 I did listen to the work session, and there were some conversations about some additional 1543 01:38:28,400 --> 01:38:34,460 prohibitions, and so I want to cover those options as well this evening. 1544 01:38:34,460 --> 01:38:38,400 Before I get to that, though, I want to talk about a couple of specific requests from the 1545 01:38:38,400 --> 01:38:42,280 neighbors that we are not opposed to, but might be a little challenging from a wording 1546 01:38:42,280 --> 01:38:44,800 standpoint in the zoning ordinance. 1547 01:38:44,800 --> 01:38:51,800 The neighbors prefer to have a 25-foot wide natural buffer area from their property where 1548 01:38:51,800 --> 01:38:56,440 we basically don't touch what's there today, and then a screening wall, and then another 1549 01:38:56,440 --> 01:39:03,080 25 feet, so it still meets the 50-foot width and all of the elements associated with it. 1550 01:39:03,080 --> 01:39:08,120 We are fine with that being codified in the ordinance, if that's the wish of the council. 1551 01:39:08,120 --> 01:39:13,960 I did speak with the neighbor about how that may create some vermin-type situations or 1552 01:39:13,960 --> 01:39:16,920 something where there's a little bit of a no man's land where something might not get 1553 01:39:16,920 --> 01:39:22,440 maintained well, and their preference was that that's how it is today, and they would 1554 01:39:22,440 --> 01:39:26,040 like for it to stay that way because it's a natural buffer. 1555 01:39:26,040 --> 01:39:34,200 We've also heard considerable conversation about a drainage, and specifically there is 1556 01:39:34,200 --> 01:39:42,240 a potential ESA that comes through the northeast side of the property here, and there's really 1557 01:39:42,240 --> 01:39:46,160 not a whole lot we can do from a zoning standpoint to address drainage. 1558 01:39:46,160 --> 01:39:52,840 I think it's well addressed in the design criteria manual for drainage design in that 1559 01:39:52,840 --> 01:39:58,280 we're not permitted to increase runoff from what it is today, and we have to detain for 1560 01:39:58,280 --> 01:40:01,000 water quality volume as well. 1561 01:40:01,000 --> 01:40:08,760 However, there are some existing drainage issues across Black Road draining to the south, 1562 01:40:08,760 --> 01:40:12,460 and there's some concerns about contamination of water runoff. 1563 01:40:12,460 --> 01:40:15,320 I just want to acknowledge those here in front of you all today. 1564 01:40:15,320 --> 01:40:21,160 I don't know that we have a solution other than following the criteria manual when the 1565 01:40:21,160 --> 01:40:26,920 property does develop, and hopefully we would be involved with that developer at that time 1566 01:40:26,920 --> 01:40:31,760 and can help encourage them to work with the neighbors to solve some of those issues. 1567 01:40:31,760 --> 01:40:37,640 There's also concern about landscaping being irrigated and maintained, and we've covered 1568 01:40:37,640 --> 01:40:44,040 the requirement that the landscape buffer would require irrigation and that any landscaping 1569 01:40:44,040 --> 01:40:50,800 that did not survive within the first couple of years would be required to be replaced. 1570 01:40:50,800 --> 01:40:57,000 As it relates to allowable land uses, these are the industrial category allowable land 1571 01:40:57,000 --> 01:41:00,480 uses that would be permitted under LI. 1572 01:41:00,480 --> 01:41:03,880 Just the highlighted ones are the only ones that are permitted by right. 1573 01:41:03,880 --> 01:41:08,800 Those that have an S beside them would require a specific use permit, which would require 1574 01:41:08,800 --> 01:41:11,100 us to come back before you again. 1575 01:41:11,100 --> 01:41:15,040 Those with an X are not permitted in light industrial. 1576 01:41:15,040 --> 01:41:18,520 I personally don't see anything on this list that would be objectionable. 1577 01:41:18,520 --> 01:41:23,000 However, if any of you do, we are open to discussion on those. 1578 01:41:23,000 --> 01:41:27,880 I think what I heard from the work session is really more of a concern of the auto or 1579 01:41:27,880 --> 01:41:35,880 the vehicle related uses that are highlighted here, auto wash, fuel sales, auto repair shop, 1580 01:41:35,880 --> 01:41:37,560 minor and major. 1581 01:41:37,560 --> 01:41:44,880 We have no issue eliminating all of those as land uses on this property, and just highlighted 1582 01:41:44,880 --> 01:41:53,640 a few others here that you may want to point out or seek further prohibitions on. 1583 01:41:53,640 --> 01:41:57,360 My client is open to any of those. 1584 01:41:57,360 --> 01:42:04,720 He's basically seeking true light industrial warehousing uses on this site. 1585 01:42:04,720 --> 01:42:05,720 That concludes my presentation. 1586 01:42:05,720 --> 01:42:08,080 I'm happy to answer any questions that you have. 1587 01:42:08,080 --> 01:42:09,080 Thank you. 1588 01:42:09,080 --> 01:42:10,920 Thank you very much. 1589 01:42:10,920 --> 01:42:15,920 I'm waiting for my screen to come up here to see if we've got any questions. 1590 01:42:15,920 --> 01:42:16,920 Vice Chair Perot. 1591 01:42:16,920 --> 01:42:17,920 Thank you, Chair. 1592 01:42:17,920 --> 01:42:19,920 Just a couple of things. 1593 01:42:19,920 --> 01:42:30,640 I wasn't able to pull up the topo information quickly with the desire of the 25 foot natural 1594 01:42:30,640 --> 01:42:37,640 barrier and then the further 25 feet being where the buffer points are spent essentially 1595 01:42:37,640 --> 01:42:45,960 to create the natural buffer or the landscape buffer. 1596 01:42:45,960 --> 01:42:52,120 Is there a considerable rise or fall from the adjacent properties inland or inward to 1597 01:42:52,120 --> 01:43:02,400 the site that would cause a buffer to be more height guarding, if you will, if it were closer 1598 01:43:02,400 --> 01:43:04,600 than further away? 1599 01:43:04,600 --> 01:43:13,920 The low points on this site are near the east, southeast corner, and then south along Black. 1600 01:43:13,920 --> 01:43:16,680 Anything falls to the southeast. 1601 01:43:16,680 --> 01:43:22,080 I don't know that having it closer or further away is necessarily going to affect the visual 1602 01:43:22,080 --> 01:43:23,080 buffer. 1603 01:43:23,080 --> 01:43:24,080 Okay. 1604 01:43:24,080 --> 01:43:30,440 Then secondly, I appreciate you looking into the typical heights of developments and that 1605 01:43:30,440 --> 01:43:31,440 sort of thing. 1606 01:43:31,440 --> 01:43:40,920 I'm really not very familiar with the economic cost jumps, if you will, in industrial type 1607 01:43:40,920 --> 01:43:44,200 large building construction. 1608 01:43:44,200 --> 01:43:51,320 What I'm wondering is, does setting 55 feet for the entire, I mean, not the entire highlighted 1609 01:43:51,320 --> 01:43:57,240 parcel you're there, but the parcel that we're talking about in this rezoning, it's fairly 1610 01:43:57,240 --> 01:43:59,280 tall and wide, right? 1611 01:43:59,280 --> 01:44:06,500 There's some places there that are more than 1,000 feet from the adjacent properties. 1612 01:44:06,500 --> 01:44:14,400 I wouldn't want a 55 foot height limit carte blanche in that region to cause the development 1613 01:44:14,400 --> 01:44:22,880 to move closer to the adjacent residential sites if allowing 65 feet or something else, 1614 01:44:22,880 --> 01:44:28,360 if it made more sense from a construction dollars perspective on the northern and western 1615 01:44:28,360 --> 01:44:35,800 side of the site would allow them the flexibility, if you would, to not encroach as close as 1616 01:44:35,800 --> 01:44:36,800 possible. 1617 01:44:36,800 --> 01:44:37,800 Does that make sense? 1618 01:44:37,800 --> 01:44:38,800 Sure. 1619 01:44:38,800 --> 01:44:40,080 I'll do my best to address that question. 1620 01:44:40,080 --> 01:44:45,520 The height that we arrived at, 55 feet, is really driven by clearance heights for the 1621 01:44:45,520 --> 01:44:49,160 various uses that warehouses typically have. 1622 01:44:49,160 --> 01:44:54,160 You're going to have dock doors and bays where you may have equipment moving in and out, 1623 01:44:54,160 --> 01:45:00,120 open span areas for storage and maneuvering of equipment inside the building. 1624 01:45:00,120 --> 01:45:02,600 That's really where the 55 feet came from. 1625 01:45:02,600 --> 01:45:08,280 I don't know that there's a direct correlation between square footage versus height. 1626 01:45:08,280 --> 01:45:13,460 It's more about what's functioning in the building and how much clearance span they 1627 01:45:13,460 --> 01:45:20,000 need to be able to maneuver inside the building and in and out of the building. 1628 01:45:20,000 --> 01:45:26,480 The 55 feet seem to be of the projects that I looked at in the recent year that have been 1629 01:45:26,480 --> 01:45:36,080 permitted 55 feet seem to be the highest that I found, and so most are right at 50 feet. 1630 01:45:36,080 --> 01:45:37,080 Okay. 1631 01:45:37,080 --> 01:45:38,080 Thanks. 1632 01:45:38,080 --> 01:45:39,080 That does help. 1633 01:45:39,080 --> 01:45:40,080 Thank you. 1634 01:45:40,080 --> 01:45:41,080 Thank you. 1635 01:45:41,080 --> 01:45:42,080 Any other questions at the moment? 1636 01:45:42,080 --> 01:45:43,080 Thank you very much. 1637 01:45:43,080 --> 01:45:44,080 Thank you. 1638 01:45:44,080 --> 01:45:45,080 Appreciate it. 1639 01:45:45,080 --> 01:45:48,640 I don't have any cards in front of me, but this is a public hearing. 1640 01:45:48,640 --> 01:45:51,680 Is there anyone wishing to come speak on this item? 1641 01:45:51,680 --> 01:46:01,800 Yep, come on down. 1642 01:46:01,800 --> 01:46:04,480 If you will state your name and address, your time will begin. 1643 01:46:04,480 --> 01:46:05,960 Yes, I'm Debbie Brooks. 1644 01:46:05,960 --> 01:46:09,680 I live at 5585 Black Road. 1645 01:46:09,680 --> 01:46:12,560 My concern is about the barrier structure. 1646 01:46:12,560 --> 01:46:21,360 It needs to be substantial enough to last years, decades, five, 10 decades, because 1647 01:46:21,360 --> 01:46:26,240 the sum of structures as we know, they look substantial initially, and yet they deteriorate 1648 01:46:26,240 --> 01:46:27,240 in attrition. 1649 01:46:27,240 --> 01:46:31,120 It looks horrible after just a few years. 1650 01:46:31,120 --> 01:46:37,160 So if that can be addressed about the quality and the sustainability of that barrier, I 1651 01:46:37,160 --> 01:46:38,520 would appreciate it. 1652 01:46:38,520 --> 01:46:39,800 Thank you. 1653 01:46:39,800 --> 01:46:40,800 Let me ask you a question. 1654 01:46:40,800 --> 01:46:41,800 Yes. 1655 01:46:41,800 --> 01:46:42,800 If I could, please. 1656 01:46:42,800 --> 01:46:44,600 You're talking about the buffering, like that 250 foot buffer. 1657 01:46:44,600 --> 01:46:45,600 Is that what you're referring to? 1658 01:46:45,600 --> 01:46:50,280 Well, there's a 25 foot, and then a barrier is my understanding, and then another 25 feet. 1659 01:46:50,280 --> 01:46:52,960 In what Ms. Bissett just presented. 1660 01:46:52,960 --> 01:46:56,760 Yes, so that barrier, a physical barrier is my understanding. 1661 01:46:56,760 --> 01:46:58,480 Is that yours as well? 1662 01:46:58,480 --> 01:47:03,640 I think that was a little bit different than the material that we had right in front of 1663 01:47:03,640 --> 01:47:04,640 us. 1664 01:47:04,640 --> 01:47:08,720 So I'll probably ask her to bring that back up, and we can discuss that a little bit further. 1665 01:47:08,720 --> 01:47:10,320 Thank you for sharing your concerns. 1666 01:47:10,320 --> 01:47:11,920 Appreciate it. 1667 01:47:11,920 --> 01:47:15,780 Is there anyone else wishing to speak on this item? 1668 01:47:15,780 --> 01:47:23,400 Come on down, if you'll state your name and address, your time will begin. 1669 01:47:23,400 --> 01:47:24,400 Thank you. 1670 01:47:24,400 --> 01:47:25,400 Jonathan Brooks. 1671 01:47:25,400 --> 01:47:28,760 I'm at 5579 Black Road. 1672 01:47:28,760 --> 01:47:32,760 There were several things that I discussed with Amy about the property. 1673 01:47:32,760 --> 01:47:35,120 It seems that most of those have been addressed here. 1674 01:47:35,120 --> 01:47:39,120 I'm happy with what she came up with. 1675 01:47:39,120 --> 01:47:44,360 I think there is some concern, I'll reiterate, mostly just for the records you hear from 1676 01:47:44,360 --> 01:47:45,360 me. 1677 01:47:45,360 --> 01:47:46,360 There's a concern about drainage. 1678 01:47:46,360 --> 01:47:49,400 I've done a bit of research on it, asked some friends who are in the know about it. 1679 01:47:49,400 --> 01:47:57,080 And it seems as though the natural drainage will drain off the southwest of the property 1680 01:47:57,080 --> 01:48:08,640 towards Blag and into some county land that's owned by Gary, who's not here today. 1681 01:48:08,640 --> 01:48:10,600 How is draining addressed? 1682 01:48:10,600 --> 01:48:12,800 That's the first question when it comes to planning and zoning. 1683 01:48:12,800 --> 01:48:16,520 If anybody could fill me in on how that will be addressed as a whole. 1684 01:48:16,520 --> 01:48:19,920 And then the only other question I had was on the ESA itself. 1685 01:48:19,920 --> 01:48:28,160 What are the regulatory bodies who will make sure that that ESA doesn't get polluted? 1686 01:48:28,160 --> 01:48:33,520 Because many of our homes, either when that ESA floods or if there's rain, it comes into 1687 01:48:33,520 --> 01:48:34,520 our properties. 1688 01:48:34,520 --> 01:48:37,720 Those are the only two that I had, at least right now. 1689 01:48:37,720 --> 01:48:42,200 Thank you very much for sharing your concerns. 1690 01:48:42,200 --> 01:48:50,520 I might ask Mia to come up, just so those questions is fresh in the mind. 1691 01:48:50,520 --> 01:48:54,560 Can you address either of those concerns publicly for us, please? 1692 01:48:54,560 --> 01:48:58,920 So drainage review will be done when we review their civil engineering plans. 1693 01:48:58,920 --> 01:49:03,960 Of course, we'll make sure that they are meeting our criteria, manuals, and code, and also 1694 01:49:03,960 --> 01:49:10,200 state law, which I think Amy stated, prohibits properties from creating a drainage flow that 1695 01:49:10,200 --> 01:49:16,160 is, or a rate that is greater than what was existing with any development. 1696 01:49:16,160 --> 01:49:20,320 And then as far as the ESA review, that is, again, another review that staff does. 1697 01:49:20,320 --> 01:49:25,780 The alternative ESA plans do come before this body, if it comes to that. 1698 01:49:25,780 --> 01:49:32,960 But ESA compliance is a staff review, and I don't know... 1699 01:49:32,960 --> 01:49:40,320 As far as, I think, maybe Tina could speak to what happens after the ESA review, but 1700 01:49:40,320 --> 01:49:48,640 I know that that's also done at civil engineering plan review, end zone compliance plan review. 1701 01:49:48,640 --> 01:49:49,640 We have one... 1702 01:49:49,640 --> 01:49:50,640 Christy is here. 1703 01:49:50,640 --> 01:49:51,640 Excellent. 1704 01:49:51,640 --> 01:49:52,640 Awesome. 1705 01:49:52,640 --> 01:49:53,640 Yeah. 1706 01:49:53,640 --> 01:49:54,640 Awesome. 1707 01:49:54,640 --> 01:49:55,640 Hello, Christy. 1708 01:49:55,640 --> 01:49:58,440 Hi, Christy Upton, environmental compliance coordinator, and I am the main staff who reviews 1709 01:49:58,440 --> 01:50:05,120 environmentally sensitive areas when there is a property where there's environmentally 1710 01:50:05,120 --> 01:50:09,880 sensitive areas, I'm heavily involved in that process. 1711 01:50:09,880 --> 01:50:17,120 So in this case of this property, there was a field assessment in the past where we confirmed 1712 01:50:17,120 --> 01:50:24,640 that there is a riparian buffer or a zone of vegetation that spans 50 feet on either 1713 01:50:24,640 --> 01:50:28,360 side of the waterway itself. 1714 01:50:28,360 --> 01:50:36,440 The regulatory protection is just focused on the vegetation and is not a part of drainage 1715 01:50:36,440 --> 01:50:38,540 and drainage control. 1716 01:50:38,540 --> 01:50:45,960 So that distinction needs to be in the minds of the reviewers and the applicant. 1717 01:50:45,960 --> 01:50:53,040 And then in addition to that, any drainage issues should be addressed through the civil 1718 01:50:53,040 --> 01:50:56,120 plans or through drainage reviews. 1719 01:50:56,120 --> 01:50:57,120 Okay. 1720 01:50:57,120 --> 01:50:58,120 Thank you. 1721 01:50:58,120 --> 01:50:59,120 That does help. 1722 01:50:59,120 --> 01:51:00,120 I appreciate it, Christy. 1723 01:51:00,120 --> 01:51:01,120 Thank you. 1724 01:51:01,120 --> 01:51:02,120 Okay. 1725 01:51:02,120 --> 01:51:03,480 This is a public hearing. 1726 01:51:03,480 --> 01:51:05,840 Is there anyone else wishing to come and speak? 1727 01:51:05,840 --> 01:51:11,200 Who has not? 1728 01:51:11,200 --> 01:51:12,200 Hello there. 1729 01:51:12,200 --> 01:51:13,200 Hi. 1730 01:51:13,200 --> 01:51:19,800 My name's Tom Brooks, not related to the other Brookses, but I'm on 6801 Appaloosa Court. 1731 01:51:19,800 --> 01:51:28,480 And so my property is adjacent on the east side of this new proposed piece of property, 1732 01:51:28,480 --> 01:51:34,400 and that ESA that we're all talking about runs through a part of my property and the 1733 01:51:34,400 --> 01:51:36,280 rest of my neighborhood. 1734 01:51:36,280 --> 01:51:43,880 So I have serious concerns about drainage off that land, into that creek, into my property, 1735 01:51:43,880 --> 01:51:46,600 and through the rest of my neighborhood. 1736 01:51:46,600 --> 01:51:49,360 I think she briefly mentioned a detention pond. 1737 01:51:49,360 --> 01:51:53,480 I don't know if it was specifically stated, but I'm not even sure that a detention pond 1738 01:51:53,480 --> 01:51:54,480 is going to be enough. 1739 01:51:54,480 --> 01:52:01,320 Depending on what type of structure is being built on that, I heard me say that a study 1740 01:52:01,320 --> 01:52:06,360 would be done after a decision was made on what type of structure would be built. 1741 01:52:06,360 --> 01:52:10,200 I think a study needs to be done now. 1742 01:52:10,200 --> 01:52:15,800 There's serious drainage concerns into that creek, into that ESA currently. 1743 01:52:15,800 --> 01:52:21,360 And there's two properties that haven't been built in Lakeview Ranch, and it's because 1744 01:52:21,360 --> 01:52:26,240 of the issues of that creek and the drainage from that property. 1745 01:52:26,240 --> 01:52:30,600 They've talked about the drainage being southwest or south towards Blag, but a good portion 1746 01:52:30,600 --> 01:52:37,680 of this newly rezoned proposed land drains eastward towards that creek. 1747 01:52:37,680 --> 01:52:42,320 So any significant structure that gets built there is going to cause significant drainage 1748 01:52:42,320 --> 01:52:45,720 into that creek, which already floods. 1749 01:52:45,720 --> 01:52:50,000 And it's on my property, a good portion of that, you'll see that property line, a good 1750 01:52:50,000 --> 01:52:52,520 portion of that property is my property. 1751 01:52:52,520 --> 01:52:56,560 And so I have serious concerns if anything gets built there, and no study being done 1752 01:52:56,560 --> 01:53:01,160 until after a decision has been made of what's being built there. 1753 01:53:01,160 --> 01:53:02,160 That's a serious problem. 1754 01:53:02,160 --> 01:53:04,800 And I don't know if a detention pond is enough. 1755 01:53:04,800 --> 01:53:09,040 I think a retention pond at the minimum has to be built. 1756 01:53:09,040 --> 01:53:12,720 And you don't even know what size a retention pond needs to be built if you don't know what 1757 01:53:12,720 --> 01:53:15,600 structure is going to be built there. 1758 01:53:15,600 --> 01:53:24,680 So I'd like that to be seriously considered by this committee before anything's decided. 1759 01:53:24,680 --> 01:53:30,820 The other concern I think has been addressed here as far as the traffic on Blag Road. 1760 01:53:30,820 --> 01:53:33,360 I'm not sure how familiar you guys are with Blag Road. 1761 01:53:33,360 --> 01:53:36,200 It's a narrow two-lane road currently. 1762 01:53:36,200 --> 01:53:41,420 It cannot support any kind of trucks driving on that currently. 1763 01:53:41,420 --> 01:53:45,840 You get driven off the road if any significant vehicle comes down that road the opposite 1764 01:53:45,840 --> 01:53:46,840 direction. 1765 01:53:46,840 --> 01:53:50,680 So I'm not sure how you're going to propose to prevent any trucks coming down Blag. 1766 01:53:50,680 --> 01:53:59,520 I mean, even if you're preventing entrance or exit from that property onto Blag, they 1767 01:53:59,520 --> 01:54:03,280 can still exit via Geesling and get to Blag. 1768 01:54:03,280 --> 01:54:10,040 So I mean, if you're familiar with 380 now and how this property is structured, the only 1769 01:54:10,040 --> 01:54:14,280 way you can get out of there is to go east on 380. 1770 01:54:14,280 --> 01:54:19,160 What's the proposed solution for any truck wanting to go the other direction? 1771 01:54:19,160 --> 01:54:25,720 They're going to go down Geesling onto Blag and it's going to cause more issues. 1772 01:54:25,720 --> 01:54:29,360 I'm surprised there's not more people that live on Blag that aren't complaining about 1773 01:54:29,360 --> 01:54:30,520 this. 1774 01:54:30,520 --> 01:54:35,280 That's a significant issue that needs to be addressed before anything is built, before 1775 01:54:35,280 --> 01:54:38,240 zoning is changed. 1776 01:54:38,240 --> 01:54:42,520 And I'm not sure what type of structures can be built underneath those power lines and 1777 01:54:42,520 --> 01:54:49,520 over that gas line underground, but you know, I'm not sure why we're even having a discussion 1778 01:54:49,520 --> 01:54:55,160 of rezoning that piece of property at this point in time. 1779 01:54:55,160 --> 01:54:58,160 Any questions for me? 1780 01:54:58,160 --> 01:55:03,880 I do not see any, but thank you for sharing your concern. 1781 01:55:03,880 --> 01:55:07,000 When will anything be addressed about that ESA, because it's been brought up a number 1782 01:55:07,000 --> 01:55:13,400 of times, but nothing's been said about what would be addressed. 1783 01:55:13,400 --> 01:55:17,440 That 50 foot buffer that she talked about on each side of the creek, it's actually larger 1784 01:55:17,440 --> 01:55:24,720 than that, the tree canopy, so I would like that to not be disturbed at all. 1785 01:55:24,720 --> 01:55:25,720 Is that my time? 1786 01:55:25,720 --> 01:55:26,720 It is. 1787 01:55:26,720 --> 01:55:27,720 Thank you very much. 1788 01:55:27,720 --> 01:55:28,720 Appreciate it. 1789 01:55:28,720 --> 01:55:31,600 All right. 1790 01:55:31,600 --> 01:55:37,360 This is a public hearing, come on down. 1791 01:55:37,360 --> 01:55:39,680 Good evening. 1792 01:55:39,680 --> 01:55:41,520 My name is Cynthia Porter. 1793 01:55:41,520 --> 01:55:47,800 I live at 5511 Black Road with my husband and my daughter and my four-year-old granddaughter. 1794 01:55:47,800 --> 01:55:53,760 I ask for your consideration to protect the interests of my family and our neighbors. 1795 01:55:53,760 --> 01:55:54,760 I love Denton. 1796 01:55:54,760 --> 01:56:00,200 I've earned two degrees at the University of North Texas, bachelor's in education and 1797 01:56:00,200 --> 01:56:01,960 educational administration. 1798 01:56:01,960 --> 01:56:09,880 I retired from public education just two years ago, after 32 years, 18 of which I was a campus 1799 01:56:09,880 --> 01:56:17,480 administrator, so I understand how difficult it is to be in your position to make decisions. 1800 01:56:17,480 --> 01:56:21,840 Each day when I go home at night, to know that I made those decisions based upon what 1801 01:56:21,840 --> 01:56:26,880 was on the best interest of my kids made me sleep well at night, and to know I did the 1802 01:56:26,880 --> 01:56:34,080 wrong thing, the right thing, no matter how difficult that it was, putting the kids first. 1803 01:56:34,080 --> 01:56:40,160 And so I ask that you also put yourself in that shoes in putting our neighborhood and 1804 01:56:40,160 --> 01:56:46,200 our neighbors first above businesses that haven't even developed an ownership and plans 1805 01:56:46,200 --> 01:56:55,640 that haven't even come to fruition after decades, decades of being a residentially zoned area. 1806 01:56:55,640 --> 01:57:00,200 We purchased our home in March of 2007. 1807 01:57:00,200 --> 01:57:04,920 I believe I'm one of the longest residents that have lived on Black Road adjacent to 1808 01:57:04,920 --> 01:57:09,280 that property. 1809 01:57:09,280 --> 01:57:14,400 My daughter grew up and went to school here for 13 years, attends Texas Women's University. 1810 01:57:14,400 --> 01:57:18,020 We are vested citizens in this community. 1811 01:57:18,020 --> 01:57:26,480 We may not be business owners, but we pay our taxes and we love our neighborhood. 1812 01:57:26,480 --> 01:57:30,860 It's part of the American dream to come out here and to build and own property. 1813 01:57:30,860 --> 01:57:36,720 As you look at a map, the smallest acreage in that neighborhood is three acres. 1814 01:57:36,720 --> 01:57:39,380 We're on the outskirts of Denton. 1815 01:57:39,380 --> 01:57:47,360 We chose to live in a nice community where we had space, we had breathing room. 1816 01:57:47,360 --> 01:57:51,520 Out of the seven homes that are on Black Road, five of them have been built within the past 1817 01:57:51,520 --> 01:57:53,720 10 years. 1818 01:57:53,720 --> 01:57:54,920 They're newer homes. 1819 01:57:54,920 --> 01:58:00,920 People have invested themselves into coming and living and being a part of this area and 1820 01:58:00,920 --> 01:58:05,080 to have a little breathing space and a little breathing room. 1821 01:58:05,080 --> 01:58:09,720 You've looked at maps probably from above and seen plots and drawings, but if you've 1822 01:58:09,720 --> 01:58:13,700 never driven the neighborhood, it is very unique. 1823 01:58:13,700 --> 01:58:15,640 There are no cookie cutter homes. 1824 01:58:15,640 --> 01:58:16,640 They're all custom. 1825 01:58:16,640 --> 01:58:17,640 They're all different. 1826 01:58:17,640 --> 01:58:19,180 There's no comps. 1827 01:58:19,180 --> 01:58:23,800 Real estate experts will tell you there's no comps for my home in the area. 1828 01:58:23,800 --> 01:58:26,820 It's different and it's special. 1829 01:58:26,820 --> 01:58:33,640 I love looking out my back patio onto this adjacent property that is currently trees 1830 01:58:33,640 --> 01:58:40,340 and canopies and have lots of wildlife, wild boars, deer, coyotes, all that comes with 1831 01:58:40,340 --> 01:58:42,460 that. 1832 01:58:42,460 --> 01:58:48,400 Why would we move our families and invest in this area that has been residentially zoned 1833 01:58:48,400 --> 01:58:54,720 for decades to have it now be changed to light industrial? 1834 01:58:54,720 --> 01:58:57,760 We've invested our time and our family. 1835 01:58:57,760 --> 01:59:07,160 I understand the staff analysts, they have all of the electrical work, the gas pipelines. 1836 01:59:07,160 --> 01:59:12,960 It can't be built residential on that adjacent property, but that's not our burden to bear. 1837 01:59:12,960 --> 01:59:18,840 That's not our fault to have to compromise our property values, our tax values, my well 1838 01:59:18,840 --> 01:59:20,440 water, my well system. 1839 01:59:20,440 --> 01:59:23,280 We're all on well water out there. 1840 01:59:23,280 --> 01:59:25,640 That's not our burden to bear. 1841 01:59:25,640 --> 01:59:29,480 It's not our burden to bear to have to tie those plots up with a nice little bow and 1842 01:59:29,480 --> 01:59:35,320 make them all unanimous zoning because some are light industrial and some are residential. 1843 01:59:35,320 --> 01:59:37,280 That's not my burden to bear. 1844 01:59:37,280 --> 01:59:43,520 My burden to bear is to raise my family and to enjoy my investment in the city of Den. 1845 01:59:43,520 --> 01:59:48,240 I know it's a difficult decision when they're looking at fiscal investments and $8 billion, 1846 01:59:48,240 --> 01:59:49,240 million dollars. 1847 01:59:49,240 --> 01:59:56,360 I can't compete with that, but I do ask that you do consider that we have our own investment 1848 01:59:56,360 --> 01:59:59,980 in our own families and the being good community citizens. 1849 01:59:59,980 --> 02:00:00,980 Thank you. 1850 02:00:00,980 --> 02:00:01,980 Thank you. 1851 02:00:01,980 --> 02:00:02,980 Appreciate it. 1852 02:00:02,980 --> 02:00:10,680 Commissioner Pruitt, I know I had seen your name and I did not call on you before that 1853 02:00:10,680 --> 02:00:11,680 speaker. 1854 02:00:11,680 --> 02:00:12,680 Did you have something to add? 1855 02:00:12,680 --> 02:00:13,680 Yeah. 1856 02:00:13,680 --> 02:00:14,680 I had a late question for the previous speaker. 1857 02:00:14,680 --> 02:00:15,680 Okay. 1858 02:00:15,680 --> 02:00:16,680 If it's possible for them to come back. 1859 02:00:16,680 --> 02:00:17,680 Of course. 1860 02:00:17,680 --> 02:00:18,680 Yes. 1861 02:00:18,680 --> 02:00:19,680 Yes. 1862 02:00:19,680 --> 02:00:22,680 Yes, please. 1863 02:00:22,680 --> 02:00:28,480 Thank you for coming and speaking to give clarity of the types of things you're concerned 1864 02:00:28,480 --> 02:00:30,800 about. 1865 02:00:30,800 --> 02:00:38,240 It strikes me that sometimes when we have ESAs and we do the ESA plans for that, the 1866 02:00:38,240 --> 02:00:44,360 type of buffering that we do, whether it's natural plantings or a wall or that sort of 1867 02:00:44,360 --> 02:00:52,040 thing is limited for the reasons of maintaining the natural order of that ESA buffer. 1868 02:00:52,040 --> 02:00:58,680 I'm wondering is ... I'm anticipating that we may talk a little bit about what that buffer 1869 02:00:58,680 --> 02:01:04,500 and fence and wall might look like, and I want to make sure that your perspective is 1870 02:01:04,500 --> 02:01:16,140 heard from a stance of is a wall or fence preferred, and if so, what does that look 1871 02:01:16,140 --> 02:01:22,680 like or is it really just let's keep the natural order the way things are and focus on giving 1872 02:01:22,680 --> 02:01:26,400 flexibility to provide a buffer visually there. 1873 02:01:26,400 --> 02:01:27,400 Does that make sense? 1874 02:01:27,400 --> 02:01:36,360 Yes, so luckily for me, the tree canopy that surrounds the creek, that ESA, kind of runs 1875 02:01:36,360 --> 02:01:42,560 down my property line, but there's two properties next to me that are exposed directly to the 1876 02:01:42,560 --> 02:01:54,160 lots, to this property that we're speaking about, and so they will have more of an impact. 1877 02:01:54,160 --> 02:02:01,280 For me, the existing canopy, if it's not changed harm or damaged in any way, is enough of a 1878 02:02:01,280 --> 02:02:08,400 buffer that I won't see anything beyond that, but the bigger concern for me is obviously 1879 02:02:08,400 --> 02:02:14,600 the drainage and anything that comes towards that creek. 1880 02:02:14,600 --> 02:02:16,800 Amy had mentioned a detention pond. 1881 02:02:16,800 --> 02:02:22,440 I'm not sure ... There's been no discussion about where that would even be located, how 1882 02:02:22,440 --> 02:02:27,360 large it would be, making sure ... I mean, if no study's been done on the type of drainage, 1883 02:02:27,360 --> 02:02:34,040 how much drainage, what direction the drainage, nobody knows where and how large that would 1884 02:02:34,040 --> 02:02:35,760 be, right? 1885 02:02:35,760 --> 02:02:36,800 I don't even know if it's enough. 1886 02:02:36,800 --> 02:02:43,440 Like I mentioned, I think a retention pond would probably be more appropriate, but I 1887 02:02:43,440 --> 02:02:44,440 don't even know that. 1888 02:02:44,440 --> 02:02:49,540 I would love for whoever's responsible for this ESA and any drainage towards it to do 1889 02:02:49,540 --> 02:02:52,000 a study and understand that prior to. 1890 02:02:52,000 --> 02:02:53,000 Thank you. 1891 02:02:53,000 --> 02:02:54,000 Yeah. 1892 02:02:54,000 --> 02:03:01,000 I mean, as far as the buffer, I think it would be obviously the folks on the black side of 1893 02:03:01,000 --> 02:03:05,320 the property and the other two next to me that would have more of an idea of what would 1894 02:03:05,320 --> 02:03:08,200 be better to obscure that view. 1895 02:03:08,200 --> 02:03:09,200 Okay. 1896 02:03:09,200 --> 02:03:10,200 Thank you. 1897 02:03:10,200 --> 02:03:11,200 Thank you very much. 1898 02:03:11,200 --> 02:03:12,200 Okay. 1899 02:03:12,200 --> 02:03:13,200 This is a public hearing. 1900 02:03:13,200 --> 02:03:22,480 Is there anyone else wishing to speak who has not already? 1901 02:03:22,480 --> 02:03:25,480 Hello. 1902 02:03:25,480 --> 02:03:26,480 Hi. 1903 02:03:26,480 --> 02:03:27,480 Do I need to state my name again? 1904 02:03:27,480 --> 02:03:28,480 You do. 1905 02:03:28,480 --> 02:03:29,480 All right. 1906 02:03:29,480 --> 02:03:30,480 I'm Deborah Brooks. 1907 02:03:30,480 --> 02:03:31,480 I live at 5585 Black Brook. 1908 02:03:31,480 --> 02:03:32,840 And you did speak once, right? 1909 02:03:32,840 --> 02:03:33,840 Yes. 1910 02:03:33,840 --> 02:03:34,840 Okay. 1911 02:03:34,840 --> 02:03:35,840 May I speak twice? 1912 02:03:35,840 --> 02:03:38,440 I was under four minutes. 1913 02:03:38,440 --> 02:03:40,640 I will go ahead and let you have the floor for ... 1914 02:03:40,640 --> 02:03:41,640 Thank you. 1915 02:03:41,640 --> 02:03:42,640 Yes. 1916 02:03:42,640 --> 02:03:43,640 Thank you. 1917 02:03:43,640 --> 02:03:44,640 Just cross my mind as we were sitting here. 1918 02:03:44,640 --> 02:03:48,040 You know how sometimes light industrial areas or industrial areas do have these lights that 1919 02:03:48,040 --> 02:03:52,760 just glow like something from outer space. 1920 02:03:52,760 --> 02:04:00,600 I would think light pollution might be something that needs to be addressed as well so that 1921 02:04:00,600 --> 02:04:03,280 it's more pleasant in our neighborhood. 1922 02:04:03,280 --> 02:04:07,160 That's all I have to say. 1923 02:04:07,160 --> 02:04:08,160 Commissioner Thacker. 1924 02:04:08,160 --> 02:04:09,160 Thank you, Chair. 1925 02:04:09,160 --> 02:04:10,160 Quick question. 1926 02:04:10,160 --> 02:04:15,520 I'm looking at some of those of you that gave public comment and thank you for participating 1927 02:04:15,520 --> 02:04:19,840 in your community and coming and speaking for your area. 1928 02:04:19,840 --> 02:04:27,160 I'm looking at some of your addresses in relation to where the Black Road and Giesling Road 1929 02:04:27,160 --> 02:04:28,160 are at. 1930 02:04:28,160 --> 02:04:32,560 And it looks like there's already some industrial areas that are established there. 1931 02:04:32,560 --> 02:04:39,760 And in addition, speaking to the lighting, those electric units, are those not already 1932 02:04:39,760 --> 02:04:41,520 highly lit at night? 1933 02:04:41,520 --> 02:04:44,480 Are you talking about the electric area? 1934 02:04:44,480 --> 02:04:45,480 Yeah. 1935 02:04:45,480 --> 02:04:46,480 The grids there? 1936 02:04:46,480 --> 02:04:47,480 Yes. 1937 02:04:47,480 --> 02:04:53,600 And they were quite invasive, and I believe, Johnna, called the city or whoever it is, 1938 02:04:53,600 --> 02:04:54,600 is in charge of those. 1939 02:04:54,600 --> 02:04:56,560 And they asked them to redirect those lights. 1940 02:04:56,560 --> 02:05:03,240 But there are some lights that even glow more than that, where if they're on really high 1941 02:05:03,240 --> 02:05:11,680 poles, that it's just illuminated tremendously at 24/7. 1942 02:05:11,680 --> 02:05:18,360 And I understand for security purposes why that might exist, but in keeping with neighborhoods 1943 02:05:18,360 --> 02:05:21,400 being right there, too, that something might want to be considered. 1944 02:05:21,400 --> 02:05:22,400 Right. 1945 02:05:22,400 --> 02:05:23,400 Okay. 1946 02:05:23,400 --> 02:05:24,400 One other quick question. 1947 02:05:24,400 --> 02:05:25,400 Yes. 1948 02:05:25,400 --> 02:05:31,720 So while the owners may have issues selling it as a residential area to investors, that 1949 02:05:31,720 --> 02:05:36,200 doesn't mean if we were to keep it zoned residential that they might not eventually 1950 02:05:36,200 --> 02:05:38,400 sell it as a residential area. 1951 02:05:38,400 --> 02:05:41,000 I'm not certain what you're saying. 1952 02:05:41,000 --> 02:05:45,200 Well, it's zoned for residential, and if we're wanting to rezone it. 1953 02:05:45,200 --> 02:05:49,480 So I think about some of the issues that were discussed tonight, everything ranging from 1954 02:05:49,480 --> 02:05:58,920 the lighting to runoff to pollution to traffic, if in fact it remains residential and we don't 1955 02:05:58,920 --> 02:06:06,520 rezone it, and eventually it's sold to a large developer, my concern is that things like 1956 02:06:06,520 --> 02:06:12,680 lighting and traffic and runoff would be even more prevalent if you had lots of families 1957 02:06:12,680 --> 02:06:13,680 in that area. 1958 02:06:13,680 --> 02:06:16,160 So those are just kind of my feedback there. 1959 02:06:16,160 --> 02:06:17,640 I didn't know if you had thought about that. 1960 02:06:17,640 --> 02:06:20,200 I'm not totally opposed to what's being proposed. 1961 02:06:20,200 --> 02:06:21,200 Okay. 1962 02:06:21,200 --> 02:06:22,200 All right. 1963 02:06:22,200 --> 02:06:26,800 I'm just saying that these maybe need to be a consideration that buffer wall, and this 1964 02:06:26,800 --> 02:06:37,120 is what's being presented tonight, and that considering those would eliminate future problems 1965 02:06:37,120 --> 02:06:45,560 and expense on the part of the developer if our considerations are taken into account. 1966 02:06:45,560 --> 02:06:46,560 Fair enough? 1967 02:06:46,560 --> 02:06:47,560 Okay. 1968 02:06:47,560 --> 02:06:48,560 Fair enough. 1969 02:06:48,560 --> 02:06:49,560 Thank you. 1970 02:06:49,560 --> 02:06:50,560 Thank you. 1971 02:06:50,560 --> 02:06:52,280 Thank you very much. 1972 02:06:52,280 --> 02:06:53,800 This is a public hearing. 1973 02:06:53,800 --> 02:06:58,640 Is there anyone else wishing to speak who has not already done so? 1974 02:06:58,640 --> 02:07:05,400 Yep, come on down. 1975 02:07:05,400 --> 02:07:11,120 Hello. 1976 02:07:11,120 --> 02:07:12,720 My name is Eric Janssen. 1977 02:07:12,720 --> 02:07:19,880 I live at 3617 Falcon Court in South Denton, but I do own 46 and 47 and a half acres of 1978 02:07:19,880 --> 02:07:23,080 land on the south side of Black. 1979 02:07:23,080 --> 02:07:29,840 My northwest little stick piece of 15-foot gravel lane connects to Black Road, and that's 1980 02:07:29,840 --> 02:07:34,600 why I'm within 200 feet, 15 feet wide connecting to the subject property. 1981 02:07:34,600 --> 02:07:40,240 But to my immediate west is Gary Castro, and he regrets not being able to be here tonight. 1982 02:07:40,240 --> 02:07:44,560 So I just want to speak on his behalf in regards to the runoff. 1983 02:07:44,560 --> 02:07:50,560 He gave Mia, and we appreciate the time that Mia Hines has given us in preparation, but 1984 02:07:50,560 --> 02:07:57,840 he showed her some pictures of the culvert that he has that he had to put lots of money 1985 02:07:57,840 --> 02:08:06,600 into for rock because of the drainage that already comes off of the native land of this 1986 02:08:06,600 --> 02:08:09,240 subject property on the north side of Black. 1987 02:08:09,240 --> 02:08:14,640 That water comes through a culvert and spouts directly onto his property and runs down through 1988 02:08:14,640 --> 02:08:18,880 the heart of his property down to the creek, down to Cooper Creek. 1989 02:08:18,880 --> 02:08:24,400 And so he was very, very concerned, just as the other Mr. Brooks mentioned about runoff. 1990 02:08:24,400 --> 02:08:29,920 If there's streets, warehouses, parking lots, etc., then that really is going to be a major 1991 02:08:29,920 --> 02:08:37,720 concern of water being shed underneath Black and directly onto Mr. Castro's property. 1992 02:08:37,720 --> 02:08:41,840 Second thing is, I want to commend Amy of Land 97. 1993 02:08:41,840 --> 02:08:47,360 It seems like she's engaged the neighbors considerably, and there have been modifications 1994 02:08:47,360 --> 02:08:56,320 to that 250-foot setback buffer and where it was, and so that's good to see. 1995 02:08:56,320 --> 02:09:00,160 Light industrial seems to be coming to this area more. 1996 02:09:00,160 --> 02:09:02,340 There's more warehouses being built. 1997 02:09:02,340 --> 02:09:08,360 Geesling is supposed to be a major north-south connector based off of Denton's mobility plan, 1998 02:09:08,360 --> 02:09:13,800 and so I would presume that vehicular traffic leaving the site would go onto Geesling, and 1999 02:09:13,800 --> 02:09:17,280 Geesling at 380 will have to have a traffic light. 2000 02:09:17,280 --> 02:09:22,320 So vehicular traffic going west will want to go to Geesling and then up to the traffic 2001 02:09:22,320 --> 02:09:23,880 light on 380. 2002 02:09:23,880 --> 02:09:31,360 Truck traffic going east would end up going the university exit to go east, would make 2003 02:09:31,360 --> 02:09:34,360 the most sense. 2004 02:09:34,360 --> 02:09:40,840 Sewer drainage, I don't even know where they're planning on sewer exactly. 2005 02:09:40,840 --> 02:09:46,720 Sewage drainage has always been a difficult problem for this part of the city, but that's 2006 02:09:46,720 --> 02:09:49,280 not part of the zoning. 2007 02:09:49,280 --> 02:09:50,880 Storm drainage. 2008 02:09:50,880 --> 02:09:58,600 The lighting issue that Ms. Brooks mentioned, I don't know whether there's a way to restrict 2009 02:09:58,600 --> 02:10:04,400 lighting so that the shields around the light do not permit the light to go beyond the property 2010 02:10:04,400 --> 02:10:11,200 line, but it seems to me that something like that might be addressed or considered. 2011 02:10:11,200 --> 02:10:14,640 That's about it, really. 2012 02:10:14,640 --> 02:10:15,640 Appreciate the time. 2013 02:10:15,640 --> 02:10:16,640 Appreciate the interest. 2014 02:10:16,640 --> 02:10:26,840 I know Mr. Martin for 22 years, just acquaintance-wise, and he supported me in my rezoning when the 2015 02:10:26,840 --> 02:10:33,200 city was trying to involuntarily rezone my property many years ago, and they were considerate 2016 02:10:33,200 --> 02:10:34,800 and respectful. 2017 02:10:34,800 --> 02:10:38,620 He was in that process, and I know they have worked for a long time trying to figure out 2018 02:10:38,620 --> 02:10:43,040 exactly what the best utilization of this property is with the power lines across it, 2019 02:10:43,040 --> 02:10:45,420 the gaseous underneath it, et cetera. 2020 02:10:45,420 --> 02:10:49,360 So I know it's a tough nut to crack, and I wish you the best, but I really encourage 2021 02:10:49,360 --> 02:10:55,600 you to give consideration to each of these neighbors because they do cherish the rural 2022 02:10:55,600 --> 02:10:58,440 atmosphere out there in East Denton. 2023 02:10:58,440 --> 02:11:01,960 They cherish that, and they want to preserve that as best they can. 2024 02:11:01,960 --> 02:11:08,880 So managing the PD in such a way as to make sure you line up in the industrial site right 2025 02:11:08,880 --> 02:11:15,560 next to these rural residential areas would be most appreciated by all the neighbors. 2026 02:11:15,560 --> 02:11:16,560 Thank you. 2027 02:11:16,560 --> 02:11:17,560 Any questions? 2028 02:11:17,560 --> 02:11:18,560 Thank you. 2029 02:11:18,560 --> 02:11:19,560 Thank you. 2030 02:11:19,560 --> 02:11:20,560 I do not see any. 2031 02:11:20,560 --> 02:11:21,680 Thank you very much. 2032 02:11:21,680 --> 02:11:28,920 Is there anyone else wishing to speak who has not done so already? 2033 02:11:28,920 --> 02:11:32,640 Okay. 2034 02:11:32,640 --> 02:11:36,880 Seeing none, I will go ahead and close the public hearing, and I will open up the dais 2035 02:11:36,880 --> 02:11:38,960 for more discussion or motion. 2036 02:11:38,960 --> 02:11:39,960 Commissioner Villareal. 2037 02:11:39,960 --> 02:11:40,960 Thank you, Chair. 2038 02:11:40,960 --> 02:11:43,920 I just had a quick question for Amy. 2039 02:11:43,920 --> 02:11:48,640 I know you mentioned earlier during the presentation y'all would be willing to restrict the PD further 2040 02:11:48,640 --> 02:11:50,960 to exclude all auto uses. 2041 02:11:50,960 --> 02:11:58,480 I believe you put travel plaza as well as parking lot and hotel motel. 2042 02:11:58,480 --> 02:12:03,640 Would that be included in the PD if this is passed today going to council? 2043 02:12:03,640 --> 02:12:10,600 That would be up to you all in terms of what conditions you put on the PD. 2044 02:12:10,600 --> 02:12:17,360 I was specifically highlighting and pointing out that the vehicle uses, we really have 2045 02:12:17,360 --> 02:12:21,880 no interest in those uses, so eliminating all of those would be fine. 2046 02:12:21,880 --> 02:12:26,240 I don't know that a hotel or motel would be appropriately located here regardless, so 2047 02:12:26,240 --> 02:12:30,880 I think that's probably a relevant conversation, but if you wanted to exclude them, you all 2048 02:12:30,880 --> 02:12:32,040 have an issue with that? 2049 02:12:32,040 --> 02:12:33,040 There you go. 2050 02:12:33,040 --> 02:12:38,160 You can exclude everything that's highlighted on this page if you would like. 2051 02:12:38,160 --> 02:12:42,280 Just a question for Chair, is there a way we could have that included as a friendly 2052 02:12:42,280 --> 02:12:43,280 amendment too? 2053 02:12:43,280 --> 02:12:49,880 Yeah, so in any kind of motion, that could be tacked on to already what staff has on 2054 02:12:49,880 --> 02:12:50,880 for condition. 2055 02:12:50,880 --> 02:12:51,880 Got it. 2056 02:12:51,880 --> 02:12:52,880 Thank you. 2057 02:12:52,880 --> 02:12:58,440 And we actually have a couple of potential amendments based on what we've heard tonight 2058 02:12:58,440 --> 02:13:01,920 if now would be an okay time to propose those. 2059 02:13:01,920 --> 02:13:05,720 In a moment, if you could, well, and maybe, no, maybe, I will let you do that because 2060 02:13:05,720 --> 02:13:09,160 it might address my question actually, so yeah, go ahead. 2061 02:13:09,160 --> 02:13:12,800 So I would propose the following additional conditions. 2062 02:13:12,800 --> 02:13:16,920 One, that an alternative ESA plan would not be permitted. 2063 02:13:16,920 --> 02:13:25,360 In other words, we could not come to you all and request encroachment into that ESA buffer. 2064 02:13:25,360 --> 02:13:31,640 And two, that the 50 points for the landscape buffer include an eight-foot masonry wall 2065 02:13:31,640 --> 02:13:38,560 that is structurally designed so that it's sound and has footings. 2066 02:13:38,560 --> 02:13:44,680 I don't necessarily, I don't know that it's a good idea to locate it at exactly 25 feet 2067 02:13:44,680 --> 02:13:50,080 from the property line just for a number of reasons, tree preservation being one, encroachment 2068 02:13:50,080 --> 02:13:56,040 into the ESA being another, and potential maintenance issues, but if we could have that 2069 02:13:56,040 --> 02:14:01,080 be a part of the 50-point requirement, at least the neighborhood would have the assurance 2070 02:14:01,080 --> 02:14:08,200 that the wall would be there and that it would be structurally engineered to last as Ms. 2071 02:14:08,200 --> 02:14:10,640 Brooks was requesting. 2072 02:14:10,640 --> 02:14:19,520 And then the other thing that I just wanted to say is that, and I think that maybe you 2073 02:14:19,520 --> 02:14:27,800 know this, if I was coming up here representing a Hillwood or an Amazon or a large industrial 2074 02:14:27,800 --> 02:14:34,760 developer, these conditions would be well above and beyond what I think they would propose. 2075 02:14:34,760 --> 02:14:40,680 And so I know it's hard for you all and the neighborhood to not have a concept plan and 2076 02:14:40,680 --> 02:14:43,680 know exactly what's going here. 2077 02:14:43,680 --> 02:14:49,080 My hope is that these conditions are great enough that it protects the neighborhood in 2078 02:14:49,080 --> 02:14:55,400 a way that if a developer was standing right here right now trying to do this, they would 2079 02:14:55,400 --> 02:15:00,600 push harder on this. 2080 02:15:00,600 --> 02:15:01,600 Go ahead, Tina. 2081 02:15:01,600 --> 02:15:02,680 I think Tina's got a question. 2082 02:15:02,680 --> 02:15:07,600 So I just want to make sure we understand the conditions that you're proposing. 2083 02:15:07,600 --> 02:15:14,520 So because we distributed an amended plan development district ordinance before the meeting, and 2084 02:15:14,520 --> 02:15:18,800 you had presented some other options within your presentation. 2085 02:15:18,800 --> 02:15:26,080 So are you, what you just spoke to regarding excluding the auto-related uses, eliminating 2086 02:15:26,080 --> 02:15:32,160 hotel motel, I think also on that slide is parking lot as a principal use and travel 2087 02:15:32,160 --> 02:15:33,160 plaza. 2088 02:15:33,160 --> 02:15:36,720 So I heard you say those uses that are highlighted in yellow on that slide are what you were 2089 02:15:36,720 --> 02:15:38,940 willing to restrict. 2090 02:15:38,940 --> 02:15:39,940 So you add that. 2091 02:15:39,940 --> 02:15:42,520 And then we have the alt ESA plan not being permitted. 2092 02:15:42,520 --> 02:15:47,480 And then the 50 points for the landscape buffer, including an eight foot tall masonry wall, 2093 02:15:47,480 --> 02:15:53,280 that no placement restrictions on that to give your client flexibility to be able to 2094 02:15:53,280 --> 02:15:58,160 address tree preservation and other site conditions that might need to be addressed. 2095 02:15:58,160 --> 02:16:00,720 So and that that wall be structurally engineered. 2096 02:16:00,720 --> 02:16:05,620 But are those the only conditions that you're proposing to offer? 2097 02:16:05,620 --> 02:16:09,600 In addition to the ones that were already within the ordinance, yes. 2098 02:16:09,600 --> 02:16:13,400 I'm open to others if y'all have specific ones that you would like to discuss. 2099 02:16:13,400 --> 02:16:14,400 Okay. 2100 02:16:14,400 --> 02:16:18,760 But I just want to make sure that we understood on the record and then I summarize the conditions 2101 02:16:18,760 --> 02:16:22,120 that you were offering up in addition to the document that we gave the commission this 2102 02:16:22,120 --> 02:16:23,120 afternoon. 2103 02:16:23,120 --> 02:16:24,120 Yes. 2104 02:16:24,120 --> 02:16:25,120 Okay. 2105 02:16:25,120 --> 02:16:26,120 Thank you. 2106 02:16:26,120 --> 02:16:27,120 Thank you. 2107 02:16:27,120 --> 02:16:29,100 So going back to the masonry wall. 2108 02:16:29,100 --> 02:16:43,660 So earlier you had a where yes, I mean a big concern for those who spoke today and was 2109 02:16:43,660 --> 02:16:49,400 one concern I had brought up to staff earlier this week was leaving as much of that natural 2110 02:16:49,400 --> 02:16:53,160 buffer as could be. 2111 02:16:53,160 --> 02:17:00,000 I don't really know exactly what can be left and how far of that 250 foot buffer it can 2112 02:17:00,000 --> 02:17:06,320 be and I guess we won't know that answer, I assume. 2113 02:17:06,320 --> 02:17:10,520 I know you have 25 foot up but is that just? 2114 02:17:10,520 --> 02:17:14,320 So that was the request of the neighborhood representative that I spoke with. 2115 02:17:14,320 --> 02:17:15,720 We're not opposed to it. 2116 02:17:15,720 --> 02:17:22,240 I think that it could potentially create some unintended consequences specifically related 2117 02:17:22,240 --> 02:17:26,360 to tree preservation and maintenance issues. 2118 02:17:26,360 --> 02:17:33,480 And so we're open to that being the condition that a wall is placed 25 feet from the property 2119 02:17:33,480 --> 02:17:38,100 line and left in a natural condition. 2120 02:17:38,100 --> 02:17:42,680 There's a possibility that you've got a heritage tree right at that 25 foot mark that has to 2121 02:17:42,680 --> 02:17:44,880 be preserved by code. 2122 02:17:44,880 --> 02:17:50,700 And so then we would kind of be in a bit of a predicament there and so having some flexibility 2123 02:17:50,700 --> 02:17:56,200 in where that wall is placed, maybe there's a statement in there that says leaving at 2124 02:17:56,200 --> 02:18:01,440 least 50% natural in its natural state. 2125 02:18:01,440 --> 02:18:05,560 Something along those lines I think gives a little more flexibility regarding the placement 2126 02:18:05,560 --> 02:18:09,040 of the wall and tree preservation. 2127 02:18:09,040 --> 02:18:17,320 I'm just trying to not box us into an issue where we can't comply in the future. 2128 02:18:17,320 --> 02:18:22,440 And I'll also point out that the ESA on the northeast corner is going to be wider than 2129 02:18:22,440 --> 02:18:27,880 that 50 foot landscape buffer so any wall will have to be outside of that in that location 2130 02:18:27,880 --> 02:18:35,960 as well, so I'm hesitant to box us in so much that it creates a problem down the road. 2131 02:18:35,960 --> 02:18:43,800 But however you all want to word that condition, we don't have a problem with. 2132 02:18:43,800 --> 02:18:46,240 I think we, Commissioner Villarreal, do you still have a question? 2133 02:18:46,240 --> 02:18:50,880 Yeah, just one more and you've answered a lot of the concerns the neighborhood folks 2134 02:18:50,880 --> 02:18:52,760 from the neighborhood brought today. 2135 02:18:52,760 --> 02:18:57,080 Just one concern that wasn't addressed regarding light pollution. 2136 02:18:57,080 --> 02:19:02,880 Have you all considered ways to negate light pollution or reduce it to assist the neighbors 2137 02:19:02,880 --> 02:19:03,880 with this change? 2138 02:19:03,880 --> 02:19:04,880 Sure, absolutely. 2139 02:19:04,880 --> 02:19:05,880 That's a great question. 2140 02:19:05,880 --> 02:19:08,560 So it's a conversation that we had during the neighborhood meetings. 2141 02:19:08,560 --> 02:19:14,160 There's specific requirements within the development code regarding lighting for both parking lots 2142 02:19:14,160 --> 02:19:20,960 and building that prevent the light from crossing the property line by more than half a foot 2143 02:19:20,960 --> 02:19:27,360 candle, if I recall correctly, so the actual light is measured at the property line and 2144 02:19:27,360 --> 02:19:32,680 the direction of parking lot lighting must be aimed down and cannot be taller than 25 2145 02:19:32,680 --> 02:19:37,760 feet, I believe, and then all building lighting must be aimed at the building or towards the 2146 02:19:37,760 --> 02:19:44,800 ground and so the light pollution issue is really addressed within the code already. 2147 02:19:44,800 --> 02:19:49,680 One of the neighbors brought up Ryan High School and when the stadium lights are on, 2148 02:19:49,680 --> 02:19:54,960 which stadium lighting is a whole separate animal, this development would have to comply 2149 02:19:54,960 --> 02:20:01,800 with lighting standards for just the development standards in subchapter 7, which would prevent 2150 02:20:01,800 --> 02:20:06,440 light pollution automatically. 2151 02:20:06,440 --> 02:20:07,440 Commissioner Pritt. 2152 02:20:07,440 --> 02:20:08,440 Thank you, Chair. 2153 02:20:08,440 --> 02:20:12,480 One question for you, Amy, and then one for staff. 2154 02:20:12,480 --> 02:20:21,240 Can you help me understand in the discussions that you've had with the community just the 2155 02:20:21,240 --> 02:20:31,600 general concern that a wall or opaque fence alleviates versus the vegetation barrier? 2156 02:20:31,600 --> 02:20:42,760 Yes, so the conversation was had with Mr. Jonathan Brooks yesterday evening and he explained 2157 02:20:42,760 --> 02:20:47,240 that right now everything is already in its natural state and the preference of the neighbors 2158 02:20:47,240 --> 02:20:52,560 is that it remain in its natural state, so in terms of creating a maintenance issue, 2159 02:20:52,560 --> 02:20:58,400 they were not concerned with a wall basically creating a barrier where the developer could 2160 02:20:58,400 --> 02:21:02,380 not get in there and maintain necessarily. 2161 02:21:02,380 --> 02:21:05,920 Their preference was that there would be no maintenance within that area. 2162 02:21:05,920 --> 02:21:11,960 I do want to clarify that that would not apply to the property along Black Road. 2163 02:21:11,960 --> 02:21:17,080 Obviously, Black Road itself needs to be landscaped and doesn't need to have a big masonry wall 2164 02:21:17,080 --> 02:21:25,340 in front of it, but all the rest of the buffer, we would not be opposed to maintaining as 2165 02:21:25,340 --> 02:21:28,580 much of it in its natural state as possible. 2166 02:21:28,580 --> 02:21:33,440 I just brought up with him at the time that I've seen it create maintenance issues and 2167 02:21:33,440 --> 02:21:38,480 other development projects in similar situations. 2168 02:21:38,480 --> 02:21:39,480 That helps. 2169 02:21:39,480 --> 02:21:46,820 I'm just trying to understand whether it would alleviate more of the concerns if it is placed 2170 02:21:46,820 --> 02:21:54,680 closer to the existing residential properties or further away in respect to the vegetation 2171 02:21:54,680 --> 02:21:55,680 barrier. 2172 02:21:55,680 --> 02:21:58,200 Does that make sense? 2173 02:21:58,200 --> 02:22:04,840 Maybe there's a condition that the masonry wall is required, but it has to be at least 2174 02:22:04,840 --> 02:22:10,680 25 feet away from the property line and what's left in between is natural vegetative state. 2175 02:22:10,680 --> 02:22:15,480 That way it can move a little bit based upon tree preservation and other conditions that 2176 02:22:15,480 --> 02:22:17,000 might require it. 2177 02:22:17,000 --> 02:22:18,000 Thank you. 2178 02:22:18,000 --> 02:22:22,320 Then for staff, as always, we get questions about drainage. 2179 02:22:22,320 --> 02:22:25,600 I'm not sure if this is Christy or somebody else. 2180 02:22:25,600 --> 02:22:33,240 I'm specifically wondering, in our code I know that we require the outflow to not exceed 2181 02:22:33,240 --> 02:22:35,240 the outflow before development. 2182 02:22:35,240 --> 02:22:41,120 However, I'm not certain what happens when there are two separate outflow locations on 2183 02:22:41,120 --> 02:22:42,120 a single property. 2184 02:22:42,120 --> 02:22:48,560 In other words, is it the cumulative outflow that gets regulated or at each outflow location 2185 02:22:48,560 --> 02:22:53,000 may it not exceed what it was pre-development? 2186 02:22:53,000 --> 02:22:57,320 I may defer to Christy on this if she knows anything that I don't. 2187 02:22:57,320 --> 02:23:02,080 In general, the requirement is no negative impacts to adjacent properties. 2188 02:23:02,080 --> 02:23:06,720 Whatever existing drainage conditions are on site, they cannot worsen that on any of 2189 02:23:06,720 --> 02:23:10,000 those adjacent properties. 2190 02:23:10,000 --> 02:23:15,240 If they could engineer the two different drainage areas to all flow one direction versus another, 2191 02:23:15,240 --> 02:23:20,600 that's something that we could work with them on through the civil engineering plan process. 2192 02:23:20,600 --> 02:23:25,320 My understanding is, at the end of the day, the rule is no negative impact whatsoever. 2193 02:23:25,320 --> 02:23:30,400 What's leaving the site today in terms of the amount of water, the velocity of the water, 2194 02:23:30,400 --> 02:23:34,000 can't be increased to negatively impact the neighboring properties. 2195 02:23:34,000 --> 02:23:39,200 They would have to hold it all on site and release it into the storm source system or 2196 02:23:39,200 --> 02:23:42,520 into a natural ... Sometimes we're allowed to release into the floodplain if they can 2197 02:23:42,520 --> 02:23:46,800 manage to do so at a rate that would not negatively impact other properties. 2198 02:23:46,800 --> 02:23:47,800 Okay. 2199 02:23:47,800 --> 02:23:48,800 Thank you. 2200 02:23:48,800 --> 02:23:49,800 Thanks, Haley. 2201 02:23:49,800 --> 02:24:15,520 I don't see any questions in front of me at the moment from the dance. 2202 02:24:15,520 --> 02:24:23,540 I'm trying to wrap my head around exactly what we have just discussed to make sure we've 2203 02:24:23,540 --> 02:24:27,000 got it all. 2204 02:24:27,000 --> 02:24:33,040 You gave the synopsis of what Amy proposed. 2205 02:24:33,040 --> 02:24:42,240 We just had discussion about the masonry wall language of it possibly being at least 25 2206 02:24:42,240 --> 02:24:47,560 feet from the buffer line. 2207 02:24:47,560 --> 02:24:49,560 Staff would like to be able to address that. 2208 02:24:49,560 --> 02:24:52,520 I was going to say, Mia, I didn't know if you were doing that, or Haley, so if you've 2209 02:24:52,520 --> 02:24:57,600 got that suggestion regarding the issue with the tree preservation, the natural buffer, 2210 02:24:57,600 --> 02:25:00,680 the placement of the wall, did you want to address that? 2211 02:25:00,680 --> 02:25:02,480 I'll bring Haley out to answer that one. 2212 02:25:02,480 --> 02:25:07,200 I didn't know if we were ready for conditions, and I'm welcome to add anything to the screen. 2213 02:25:07,200 --> 02:25:08,200 Thank you. 2214 02:25:08,200 --> 02:25:09,200 Okay. 2215 02:25:09,200 --> 02:25:13,660 I don't know that we could wordsmith anything appropriate here, so I'd like to have some 2216 02:25:13,660 --> 02:25:17,640 flexibility if we could to continue crafting this before it goes to council. 2217 02:25:17,640 --> 02:25:21,440 If the commission does wish to require a wall, which is always an option in a buffer, but 2218 02:25:21,440 --> 02:25:25,160 it's not required, so if the commission wanted to impose a requirement, I would ask that 2219 02:25:25,160 --> 02:25:29,960 we be left the flexibility to also address tree preservation and ESA preservation within 2220 02:25:29,960 --> 02:25:36,000 that buffer area so that we're not requiring inadvertently removal of trees and impact to 2221 02:25:36,000 --> 02:25:40,440 the natural buffer that already exists along those property lines, just to add a masonry 2222 02:25:40,440 --> 02:25:41,440 wall. 2223 02:25:41,440 --> 02:25:42,440 Completely agree. 2224 02:25:42,440 --> 02:25:45,920 Because any eight-foot wall, and I'm not an engineer, don't play one on TV, but any 2225 02:25:45,920 --> 02:25:49,720 eight-foot wall would require some sort of footing be dug into the ground that would 2226 02:25:49,720 --> 02:25:53,960 impact the roots of adjacent trees, and my understanding from our experts on staff is 2227 02:25:53,960 --> 02:25:58,200 that really any impact to the roots within the drip line of the tree, so within the canopy 2228 02:25:58,200 --> 02:26:03,520 area going straight down, could potentially do long-term damage to those trees, especially 2229 02:26:03,520 --> 02:26:09,160 if they're post oaks or pecan or other more sensitive native species. 2230 02:26:09,160 --> 02:26:14,800 We'd like to avoid that potential impact by imposing a strict location for any wall that 2231 02:26:14,800 --> 02:26:18,760 the commission may wish to see on-site. 2232 02:26:18,760 --> 02:26:31,020 What you're saying is incorporated as it would be on-site as part of the buffer in some placement? 2233 02:26:31,020 --> 02:26:33,560 I would say dictating a location would be hard. 2234 02:26:33,560 --> 02:26:37,520 If we could craft something, and I don't know, Amy, we can talk about this more. 2235 02:26:37,520 --> 02:26:42,480 My thought was if we say that the goal is tree preservation of everything that's within 2236 02:26:42,480 --> 02:26:49,440 the 50-foot buffer and a wall is required around the south and east perimeters so that 2237 02:26:49,440 --> 02:26:52,840 it does not affect those trees, something in that nature, I think, was really the intent 2238 02:26:52,840 --> 02:26:54,120 of what everyone's wanting. 2239 02:26:54,120 --> 02:26:57,520 I'm just not quite sure how we would word that at this time. 2240 02:26:57,520 --> 02:26:58,520 Right. 2241 02:26:58,520 --> 02:26:59,520 I agree. 2242 02:26:59,520 --> 02:27:04,040 That's where we're not going to be able to do it up here at this time. 2243 02:27:04,040 --> 02:27:09,480 If the commission wishes, though, that is something you could direct us to work on and 2244 02:27:09,480 --> 02:27:12,800 come up with wording, obviously, before it gets to council next week if you wanted to 2245 02:27:12,800 --> 02:27:14,760 keep this moving forward. 2246 02:27:14,760 --> 02:27:22,520 I'd have to ask Haley how we would actually make that. 2247 02:27:22,520 --> 02:27:23,520 Sure. 2248 02:27:23,520 --> 02:27:25,440 How we would do that. 2249 02:27:25,440 --> 02:27:36,320 My suggestion might be to consider tabling this, hearing the next public hearing item. 2250 02:27:36,320 --> 02:27:41,800 In that intervening time, perhaps staff can put something together, and then coming back 2251 02:27:41,800 --> 02:27:49,160 to this item so that we're not considering speculative conditions. 2252 02:27:49,160 --> 02:27:50,160 Right. 2253 02:27:50,160 --> 02:27:55,480 If we're missing something that we've taught, there's been so many things, and even on top 2254 02:27:55,480 --> 02:28:01,340 of what we were presented with at work session, that, yeah, it would be great if somebody 2255 02:28:01,340 --> 02:28:05,520 could have the time to type it all up of what was discussed. 2256 02:28:05,520 --> 02:28:13,560 Alternatively, we could come back at a subsequent meeting, but I think there's an appetite to 2257 02:28:13,560 --> 02:28:15,400 try and avoid that if possible. 2258 02:28:15,400 --> 02:28:20,000 It has been noticed for council, so Tina, I don't know if you know anything additional. 2259 02:28:20,000 --> 02:28:25,260 I was just talking with the applicant's representative, so Amy, you can confirm her if you want to 2260 02:28:25,260 --> 02:28:29,960 come to the podium or shake your head, but I had asked her about a continuance, and I 2261 02:28:29,960 --> 02:28:30,960 think we're to the point. 2262 02:28:30,960 --> 02:28:35,880 We're given the way we're crafting conditions that we do need to continue this item. 2263 02:28:35,880 --> 02:28:38,920 I would ask Mia, Haley, do you think this is something that we could continue to the 2264 02:28:38,920 --> 02:28:43,240 next planning and zoning commission meeting to give us a chance to work on that language, 2265 02:28:43,240 --> 02:28:48,840 and then being that your council date is scheduled for next week, we would have council then continue 2266 02:28:48,840 --> 02:28:53,280 to the next appropriate council meeting to allow the commission to take action. 2267 02:28:53,280 --> 02:28:54,840 I think we're fine with that. 2268 02:28:54,840 --> 02:28:55,840 Okay. 2269 02:28:55,840 --> 02:28:56,840 Thank you. 2270 02:28:56,840 --> 02:28:57,840 Thank you. 2271 02:28:57,840 --> 02:29:04,840 Appreciate that. 2272 02:29:04,840 --> 02:29:05,840 Commissioner Peruzza. 2273 02:29:05,840 --> 02:29:12,000 Thank you, Chair, and thanks for that direction and clarification on what the preferred option 2274 02:29:12,000 --> 02:29:14,520 is. 2275 02:29:14,520 --> 02:29:22,160 You know, with that, I'll move to table to the date certain of the next planning and 2276 02:29:22,160 --> 02:29:28,240 zoning commission with the following recommendations, and I invite my colleagues to add anything 2277 02:29:28,240 --> 02:29:30,640 else I've forgotten. 2278 02:29:30,640 --> 02:29:36,080 One is to restrict the automotive major and minor uses instead of just the major uses, 2279 02:29:36,080 --> 02:29:40,960 hotel, motel, and parking lot as primary use. 2280 02:29:40,960 --> 02:29:47,360 On the fence and the buffer area, my proposal, which may not be the will of the rest of the 2281 02:29:47,360 --> 02:29:55,920 commission, would be to stipulate that any fence erected along these borders to the residential 2282 02:29:55,920 --> 02:30:05,360 areas be compliant with table 7.H in our development code for the fences listed for front yard 2283 02:30:05,360 --> 02:30:12,480 fences in industrial areas, that it lists masonry wall in there, it also lists some 2284 02:30:12,480 --> 02:30:20,320 other types of fences that would be long standing and kind of alleviates the problem of having 2285 02:30:20,320 --> 02:30:23,400 a chain link fence or something like that. 2286 02:30:23,400 --> 02:30:30,720 And then as far as placement, my proposal would be that we give wide latitude as to 2287 02:30:30,720 --> 02:30:31,720 where it's placed. 2288 02:30:31,720 --> 02:30:35,440 I think the applicant and the community have worked really well together and I don't want 2289 02:30:35,440 --> 02:30:43,360 to hamstring them from working out these final details, such that any position from 25 feet 2290 02:30:43,360 --> 02:30:49,800 away all the way up to 200, 250 feet away at the edge of the setback would be permissible 2291 02:30:49,800 --> 02:30:55,480 for a fence if they wish to place one there. 2292 02:30:55,480 --> 02:31:00,840 And if it's further than the 50 foot standard buffer area, it would still count toward the 2293 02:31:00,840 --> 02:31:04,120 buffer points. 2294 02:31:04,120 --> 02:31:07,840 Is that clear, Tina? 2295 02:31:07,840 --> 02:31:10,640 I don't think it's necessarily part of your motion, correct? 2296 02:31:10,640 --> 02:31:11,640 Your motion? 2297 02:31:11,640 --> 02:31:12,640 No. 2298 02:31:12,640 --> 02:31:13,640 You're giving a recommendation. 2299 02:31:13,640 --> 02:31:14,640 Okay. 2300 02:31:14,640 --> 02:31:15,640 Exactly. 2301 02:31:15,640 --> 02:31:16,640 Yeah. 2302 02:31:16,640 --> 02:31:20,000 Motion is simply to continue and I wanted to kind of capture my thoughts and invite 2303 02:31:20,000 --> 02:31:21,000 others to you as well. 2304 02:31:21,000 --> 02:31:23,000 Was that the end of your thoughts? 2305 02:31:23,000 --> 02:31:24,000 Yes. 2306 02:31:24,000 --> 02:31:25,000 Okay. 2307 02:31:25,000 --> 02:31:26,000 Thank you. 2308 02:31:26,000 --> 02:31:27,000 All right. 2309 02:31:27,000 --> 02:31:28,000 Can I have some clarification? 2310 02:31:28,000 --> 02:31:29,000 You can. 2311 02:31:29,000 --> 02:31:30,000 Commissioner Pruitt. 2312 02:31:30,000 --> 02:31:37,760 If the fence or wall is beyond a 50 foot setback from what the residential properties and the 2313 02:31:37,760 --> 02:31:43,720 ETJ properties, then that fence or wall would be still allowed to count towards the 50 points 2314 02:31:43,720 --> 02:31:44,720 within the buffer? 2315 02:31:44,720 --> 02:31:45,720 Exactly. 2316 02:31:45,720 --> 02:31:46,720 Okay. 2317 02:31:46,720 --> 02:31:47,720 Thank you. 2318 02:31:47,720 --> 02:31:48,720 Okay. 2319 02:31:48,720 --> 02:31:54,200 So the motion on the floor is to table the item to a date certain of? 2320 02:31:54,200 --> 02:31:56,020 The next planning and zoning meeting? 2321 02:31:56,020 --> 02:31:57,020 That would be June 26. 2322 02:31:57,020 --> 02:31:58,020 Thank you. 2323 02:31:58,020 --> 02:31:59,020 June 26. 2324 02:31:59,020 --> 02:32:00,020 Good. 2325 02:32:00,020 --> 02:32:01,020 Okay. 2326 02:32:01,020 --> 02:32:02,020 Commissioner Thaggard. 2327 02:32:02,020 --> 02:32:03,020 I second tabling the item. 2328 02:32:03,020 --> 02:32:04,020 Okay. 2329 02:32:04,020 --> 02:32:07,880 We've got a first and a second to table the item to a date certain of June 26. 2330 02:32:07,880 --> 02:32:11,040 Is there any other discussion? 2331 02:32:11,040 --> 02:32:19,480 If we could get possibly the transportation talk a little bit, like can we get signage 2332 02:32:19,480 --> 02:32:20,480 somewhere? 2333 02:32:20,480 --> 02:32:26,840 I don't know if we can have an answer by then, but if we can, that would be super helpful. 2334 02:32:26,840 --> 02:32:32,200 And then yeah, just basically getting, it's a great discussion we had tonight. 2335 02:32:32,200 --> 02:32:37,840 Obviously I want to commend you on engaging the neighborhood and listening and hearing. 2336 02:32:37,840 --> 02:32:40,320 All of this is difficult, I know, for everyone. 2337 02:32:40,320 --> 02:32:47,600 So I feel comfortable that we are tabling because we changed so much tonight, I think 2338 02:32:47,600 --> 02:32:50,520 for the better, exactly what we're looking at. 2339 02:32:50,520 --> 02:32:57,480 I know this would be a lot easier if we had an actual plan in place and I know you're 2340 02:32:57,480 --> 02:33:03,080 working your best to work all around that except to have that. 2341 02:33:03,080 --> 02:33:04,080 And yeah, thank you staff. 2342 02:33:04,080 --> 02:33:08,560 Yeah, so if you'll be able to the next time have all of these things written down so we 2343 02:33:08,560 --> 02:33:13,000 know exactly what we're looking at and what we're voting on and going from there. 2344 02:33:13,000 --> 02:33:14,000 Okay. 2345 02:33:14,000 --> 02:33:15,000 Commissioner Pruitt, I think you have another point. 2346 02:33:15,000 --> 02:33:16,600 I apologize for double speaking here. 2347 02:33:16,600 --> 02:33:17,600 That's okay. 2348 02:33:17,600 --> 02:33:25,600 I brought up the transportation issues that were raised by some of the residents. 2349 02:33:25,600 --> 02:33:32,280 It's not entirely clear to me what the plan, if there is a plan yet for the bypass that 2350 02:33:32,280 --> 02:33:37,040 starts right around Geesling Road from TxDOT's perspective. 2351 02:33:37,040 --> 02:33:46,160 I'd like to understand whether northbound traffic from Geesling will be navigable toward 2352 02:33:46,160 --> 02:33:55,920 Loop 288 Northwest around town or not, just when we come back after the continuance. 2353 02:33:55,920 --> 02:33:57,360 Thank you. 2354 02:33:57,360 --> 02:33:58,360 Anything else? 2355 02:33:58,360 --> 02:33:59,360 Okay. 2356 02:33:59,360 --> 02:34:07,360 Let's go ahead and vote, please. 2357 02:34:07,360 --> 02:34:09,080 That motion carries 6-0. 2358 02:34:09,080 --> 02:34:13,000 See you at the next meeting. 2359 02:34:13,000 --> 02:34:24,860 Our next item is 5BZ220018, which is in tandem with 5CPD230001. 2360 02:34:24,860 --> 02:34:30,120 I'm going to go ahead and open both of those public hearings and invite Angie up to clarify 2361 02:34:30,120 --> 02:34:33,840 discussion on that item. 2362 02:34:33,840 --> 02:34:34,840 Hi. 2363 02:34:34,840 --> 02:34:35,840 Hi. 2364 02:34:35,840 --> 02:34:36,840 Good evening. 2365 02:34:36,840 --> 02:34:47,120 I'm Angie, review manager, both Z220018 and PD230001 are being requested to be continued 2366 02:34:47,120 --> 02:34:53,360 to the planning and zoning commission meeting on July 24th, 2024, as there have been some 2367 02:34:53,360 --> 02:34:57,680 infrastructure issues that have come to light in the last couple of days that the additional 2368 02:34:57,680 --> 02:34:59,680 time is needed to work those out. 2369 02:34:59,680 --> 02:35:07,920 The request is for July 24, 2024, for both Z220018 and PD230001. 2370 02:35:07,920 --> 02:35:09,160 Happy to answer any questions. 2371 02:35:09,160 --> 02:35:10,160 Thank you, Angie. 2372 02:35:10,160 --> 02:35:11,160 Appreciate that. 2373 02:35:11,160 --> 02:35:12,160 Any questions? 2374 02:35:12,160 --> 02:35:13,160 Okay. 2375 02:35:13,160 --> 02:35:18,880 Chair can entertain a motion or discussion. 2376 02:35:18,880 --> 02:35:34,680 I will go ahead and make a motion to postpone item 5BZ220018 and 5CPD230001 to a date certain 2377 02:35:34,680 --> 02:35:42,520 of July 24th, 2024, with the public hearing being left open on both of those items. 2378 02:35:42,520 --> 02:35:43,520 Commissioner Pedro? 2379 02:35:43,520 --> 02:35:44,520 I second. 2380 02:35:44,520 --> 02:35:45,520 Okay. 2381 02:35:45,520 --> 02:35:46,520 We've got a first and a second. 2382 02:35:46,520 --> 02:35:49,040 Is there any discussion? 2383 02:35:49,040 --> 02:35:50,320 Okay. 2384 02:35:50,320 --> 02:35:53,200 Let's go ahead and vote, please. 2385 02:35:53,200 --> 02:36:01,240 And with this, the vote would be for both of those items together. 2386 02:36:01,240 --> 02:36:03,280 Motion carries 6-0. 2387 02:36:03,280 --> 02:36:04,840 Okay. 2388 02:36:04,840 --> 02:36:16,400 That will then take us to 5D-S240003, which is in tandem with 5E-S240004. 2389 02:36:16,400 --> 02:36:21,400 I will open both of those public hearings, and Ashley is here for presentation. 2390 02:36:21,400 --> 02:36:26,000 Good evening, Chair, members of the commission, Ashley Eckstead, Associate Planner. 2391 02:36:26,000 --> 02:36:31,320 This is S24-3 and S24-4, Advanced Microbial Solutions, and I will be presenting both of 2392 02:36:31,320 --> 02:36:33,900 these cases together. 2393 02:36:33,900 --> 02:36:37,720 This request is for a specific use permit to allow a high-impact manufacturing use 2394 02:36:37,720 --> 02:36:43,160 on approximately 8 acres of land, and that is S24-3, which is outlined in red, and an 2395 02:36:43,160 --> 02:36:46,920 additional 9 1/2 acres of land, S24-4. 2396 02:36:46,920 --> 02:36:50,280 They are generally located on the southwest corner of the intersection of Shelby Lane 2397 02:36:50,280 --> 02:36:54,800 and Dakota Lane, and on the west side of Dakota Lane, 800 feet south of Shelby. 2398 02:36:54,800 --> 02:36:58,520 The existing zoning is the HI, which is shown in light purple, and the future land use is 2399 02:36:58,520 --> 02:37:02,320 industrial commerce, which is shown in dark purple. 2400 02:37:02,320 --> 02:37:06,600 Just to briefly go over the site history, in 2011, they applied for a certificate of 2401 02:37:06,600 --> 02:37:12,720 occupancy for 4951 Dakota, which is the southernmost building outlined in blue. 2402 02:37:12,720 --> 02:37:16,760 They have that certificate of occupancy that was issued for a heavy manufacturing use. 2403 02:37:16,760 --> 02:37:21,880 In 2016, they applied for a certificate of occupancy at 5001 Dakota, which is the middle 2404 02:37:21,880 --> 02:37:26,200 building outlined in blue, and they have that as a warehouse use. 2405 02:37:26,200 --> 02:37:31,960 In 2002, they applied for a certificate of occupancy for 5071, which is the northernmost 2406 02:37:31,960 --> 02:37:36,720 building outlined in blue, and that has been issued as a warehouse use as well. 2407 02:37:36,720 --> 02:37:41,480 Earlier this year, they requested a certificate of occupancy for 3650 Shelby, which is outlined 2408 02:37:41,480 --> 02:37:46,500 in red, and staff realized the intensive nature of this use, and we notified the applicant 2409 02:37:46,500 --> 02:37:50,840 that a specific use permit would be required to continue operations and to begin operations 2410 02:37:50,840 --> 02:37:54,560 at the building on Shelby. 2411 02:37:54,560 --> 02:37:58,100 To briefly go over their business operations, high-impact manufacturing, which is why we're 2412 02:37:58,100 --> 02:38:03,280 having this conversation today, the definition includes businesses that use hazardous inputs 2413 02:38:03,280 --> 02:38:07,280 in the course of their manufacturing, and it also includes fertilizer manufacturing 2414 02:38:07,280 --> 02:38:11,880 from organic matter, which both of those apply to this use. 2415 02:38:11,880 --> 02:38:15,520 Manufacturing and outdoor storage of finished product do occur in the southernmost building 2416 02:38:15,520 --> 02:38:17,940 and the middle building outlined in blue. 2417 02:38:17,940 --> 02:38:22,840 That is also proposed to occur in the northernmost building, the single lot outlined in red, and 2418 02:38:22,840 --> 02:38:27,400 the finished product is a non-hazardous that is stored outside. 2419 02:38:27,400 --> 02:38:31,640 The majority of the inputs are stored in the northernmost building on the three-lot site, 2420 02:38:31,640 --> 02:38:35,440 but they do have additional storage in the other buildings as well. 2421 02:38:35,440 --> 02:38:39,540 They do have operational controls in place, which include trenches to contain spills inside 2422 02:38:39,540 --> 02:38:42,320 the buildings, secondary containment where necessary. 2423 02:38:42,320 --> 02:38:47,200 They have a safety plan, an emergency response plan, and the outdoor storage tanks are appropriately 2424 02:38:47,200 --> 02:38:51,440 constructed for the product and the hazard rating. 2425 02:38:51,440 --> 02:38:56,500 Land use-wise, the proposed and existing operations are located within an industrial park with 2426 02:38:56,500 --> 02:39:03,440 similar types of uses, similar outdoor storage, similar types of vehicles, and similar operations. 2427 02:39:03,440 --> 02:39:06,080 To briefly go over the site layouts, these are existing buildings. 2428 02:39:06,080 --> 02:39:10,140 They are not proposing any changes to the buildings or the sites. 2429 02:39:10,140 --> 02:39:15,120 The buildings range in size from approximately 40,000 to 61,000 square feet, and the outdoor 2430 02:39:15,120 --> 02:39:18,820 storage tanks, which are highlighted on the plan in red. 2431 02:39:18,820 --> 02:39:24,680 On the existing outdoor storage tanks, which is the southernmost lot in the middle building 2432 02:39:24,680 --> 02:39:29,360 that was outlined in blue, it's the three-lot SUP, and then they are proposing additional 2433 02:39:29,360 --> 02:39:34,720 outdoor storage, which is outlined in red on the left, and that is S243, the single 2434 02:39:34,720 --> 02:39:37,760 building SUP. 2435 02:39:37,760 --> 02:39:39,720 It does meet the criteria for approval. 2436 02:39:39,720 --> 02:39:43,680 It's consistent with the goals and policies of the Denton 2040 comprehensive plan and 2437 02:39:43,680 --> 02:39:45,080 the future land use map. 2438 02:39:45,080 --> 02:39:49,280 It's compatible with the surrounding area, and approval of this SUP is not expected to 2439 02:39:49,280 --> 02:39:53,800 generate significant adverse environmental or fiscal impacts. 2440 02:39:53,800 --> 02:39:57,240 Public outreach was done, an ad was posted in the newspaper on the website, and a sign 2441 02:39:57,240 --> 02:39:58,600 was posted on the property. 2442 02:39:58,600 --> 02:40:01,280 We mailed out notices to everyone within 500 feet. 2443 02:40:01,280 --> 02:40:04,660 We did not receive any responses in opposition or in favor. 2444 02:40:04,660 --> 02:40:07,840 The applicant also discussed this project with the neighbors and delivered letters in 2445 02:40:07,840 --> 02:40:08,840 person. 2446 02:40:08,840 --> 02:40:15,400 The addresses is within 500 feet, and we performed notices for both individually. 2447 02:40:15,400 --> 02:40:19,680 To go through the conditions, I'll go through S243 first, and this is the northernmost lot 2448 02:40:19,680 --> 02:40:22,000 that is just the single lot. 2449 02:40:22,000 --> 02:40:26,000 They'll need to maintain compliance with the Texas Multisector Stormwater General Permit 2450 02:40:26,000 --> 02:40:28,680 and update their certification as required. 2451 02:40:28,680 --> 02:40:32,520 They'll also need to maintain a spill response team that requires staff training at least 2452 02:40:32,520 --> 02:40:33,960 once a year. 2453 02:40:33,960 --> 02:40:37,720 The outdoor storage tanks, and these are the outdoor storage tanks that are proposed, they'll 2454 02:40:37,720 --> 02:40:41,360 need to be screened from the right of way with an eight-foot wood fence and evergreen 2455 02:40:41,360 --> 02:40:44,960 trees with a minimum 30-foot mature height. 2456 02:40:44,960 --> 02:40:50,240 Additionally, all stored hazardous chemicals shall be located inside the building only, 2457 02:40:50,240 --> 02:40:54,040 and they are currently doing that, so the outdoor storage tanks shown on the plans are 2458 02:40:54,040 --> 02:40:56,720 not permitted to hold the hazardous materials. 2459 02:40:56,720 --> 02:41:01,040 In condition six, this was added to your conditions that we sent out to you through email earlier 2460 02:41:01,040 --> 02:41:04,720 today, and this was after discussions with building safety. 2461 02:41:04,720 --> 02:41:08,840 They will need to obtain all necessary permits within 90 days to achieve the proper storage 2462 02:41:08,840 --> 02:41:13,440 and placement of materials or chemicals within the control areas according to the building 2463 02:41:13,440 --> 02:41:14,440 code. 2464 02:41:14,440 --> 02:41:17,780 They'll also need to obtain the permits from the fire department for all the hazardous 2465 02:41:17,780 --> 02:41:20,560 chemicals stored on site. 2466 02:41:20,560 --> 02:41:24,320 Prior to any manufacturing, the wastewater discharge being connected to the city's wastewater 2467 02:41:24,320 --> 02:41:27,880 collection system, they'll need building permits to hook up to the city's wastewater 2468 02:41:27,880 --> 02:41:31,080 system on their manufacturing floor. 2469 02:41:31,080 --> 02:41:35,400 So S24-3, this is the three lots, and some of these conditions are the same, so I won't 2470 02:41:35,400 --> 02:41:36,560 reread those to you. 2471 02:41:36,560 --> 02:41:40,080 There are a few conditions that are different. 2472 02:41:40,080 --> 02:41:46,680 The southernmost lot, it does contain floodplain, so the chiller that is currently located there 2473 02:41:46,680 --> 02:41:51,760 will need to be relocated outside of the floodway and the 100-year floodplain, and all mechanical 2474 02:41:51,760 --> 02:41:55,760 equipment has to remain outside of the floodway and floodplain. 2475 02:41:55,760 --> 02:42:01,880 No outdoor storage is permitted within the floodway or floodplain as well. 2476 02:42:01,880 --> 02:42:05,560 Highlighted in red is additional changes to the conditions that we sent you earlier after 2477 02:42:05,560 --> 02:42:06,840 talking with the fire department. 2478 02:42:06,840 --> 02:42:12,520 We did add a 90-day timeframe to condition six to get the necessary permits for the storage 2479 02:42:12,520 --> 02:42:17,160 of hazardous materials, and we do have the same condition from building safety to obtain 2480 02:42:17,160 --> 02:42:23,040 any permits needed from them in accordance with the building code. 2481 02:42:23,040 --> 02:42:28,160 Staff recommendations, we do recommend approval of S24-3, which is the northernmost lot, and 2482 02:42:28,160 --> 02:42:30,760 S24-4, which is the three lots. 2483 02:42:30,760 --> 02:42:34,680 I'm happy to answer any questions, and the applicant is also here with the presentation. 2484 02:42:34,680 --> 02:42:35,680 Thank you very much, Ashley. 2485 02:42:35,680 --> 02:42:36,680 Any questions? 2486 02:42:36,680 --> 02:42:37,680 I do not see any. 2487 02:42:37,680 --> 02:42:38,680 Thank you very much. 2488 02:42:38,680 --> 02:42:46,420 Okay, I do not have a card for the applicant, but I'll go ahead and invite you up, and you 2489 02:42:46,420 --> 02:42:47,880 can give us your name and address, and . . . 2490 02:42:47,880 --> 02:43:08,640 All right. 2491 02:43:08,640 --> 02:43:09,640 Good evening, commissioners, chair. 2492 02:43:09,640 --> 02:43:16,400 My name is Jesse Copeland, 500 Winstead Building, 2728 North Harwood Street, Dallas, Texas, 2493 02:43:16,400 --> 02:43:17,400 75201. 2494 02:43:17,400 --> 02:43:21,800 I'm here representing the applicant in this request. 2495 02:43:21,800 --> 02:43:28,000 So I want to quickly thank all of staff, specifically Ashley, for reviewing, communicating, and 2496 02:43:28,000 --> 02:43:34,460 processing all this material for these two applications very quickly and efficiently. 2497 02:43:34,460 --> 02:43:35,660 I'll be brief. 2498 02:43:35,660 --> 02:43:40,640 A lot of our presentations are duplicative of Ashley's, but I just want to run through 2499 02:43:40,640 --> 02:43:43,140 a couple things. 2500 02:43:43,140 --> 02:43:44,600 Here's the site that you've seen. 2501 02:43:44,600 --> 02:43:54,500 This is for S24-3, located at 3650 Shelby Lane, an aerial, it's outlined in yellow here. 2502 02:43:54,500 --> 02:43:59,920 And here's a street view of the site facing southwest on the corner of Shelby and Dakota 2503 02:43:59,920 --> 02:44:03,440 Lane. 2504 02:44:03,440 --> 02:44:07,720 As you know, this request is for a specific use permit for high-impact manufacturing, 2505 02:44:07,720 --> 02:44:13,880 specifically, the production of a non-hazardous agricultural fertilizer that's used as a soil 2506 02:44:13,880 --> 02:44:18,980 amendment to assist with nitrogen use efficiency in row crops. 2507 02:44:18,980 --> 02:44:24,720 This is probably a good time to mention that the applicant is here to help explain and 2508 02:44:24,720 --> 02:44:32,080 answer any technical and operational questions that the commissioners may have. 2509 02:44:32,080 --> 02:44:37,560 Going forward, I'd like to just briefly outline the existing site conditions and some of the 2510 02:44:37,560 --> 02:44:39,240 background on this site. 2511 02:44:39,240 --> 02:44:46,840 As mentioned before, in 2024, the applicant entered into a lease at the site, which is 2512 02:44:46,840 --> 02:44:52,840 their fourth in the immediate area, and this site will be used to produce the applicant's 2513 02:44:52,840 --> 02:44:55,440 newest bio-stimulant technology. 2514 02:44:55,440 --> 02:44:59,200 It was during the CO process for this site that the city notified the applicant the proposed 2515 02:44:59,200 --> 02:45:06,080 use will be considered a high-impact manufacturing and that the SUP would be required. 2516 02:45:06,080 --> 02:45:12,920 It's also important to note that this use is consistent with the future land use element 2517 02:45:12,920 --> 02:45:16,960 of the Denton 2040 Comprehensive Plan. 2518 02:45:16,960 --> 02:45:22,440 As mentioned before, the site is surrounded entirely by land zone heavy industrial, and 2519 02:45:22,440 --> 02:45:27,760 the uses of the site consist of the industrial uses like light manufacturing, distribution, 2520 02:45:27,760 --> 02:45:37,000 warehousing, gas well production, as well as a trade school to the east. 2521 02:45:37,000 --> 02:45:44,280 Lastly we did want to touch a little bit on our community outreach. 2522 02:45:44,280 --> 02:45:50,840 The applicant and business owner personally delivered letters to the neighboring properties 2523 02:45:50,840 --> 02:45:57,400 that we got from the list provided by staff. 2524 02:45:57,400 --> 02:46:04,600 All but five of those addresses were made personal contact with, and the feedback was 2525 02:46:04,600 --> 02:46:10,200 overwhelmingly positive, including a few folks that mentioned that they were happy to see 2526 02:46:10,200 --> 02:46:14,480 that our business was expanding. 2527 02:46:14,480 --> 02:46:33,880 I'll move on to S24-4. 2528 02:46:33,880 --> 02:46:42,400 Again here's an aerial of the sites located within this request, 4951 here at the bottom, 2529 02:46:42,400 --> 02:46:50,400 5001 in the middle, and 5071 at the top. 2530 02:46:50,400 --> 02:47:04,840 More street views of the sites facing southwest, here's 4951, 5001, and 5071 to Codelane. 2531 02:47:04,840 --> 02:47:10,120 There's no need for me to rehash a lot of this as it's very similar to the previous 2532 02:47:10,120 --> 02:47:11,120 request. 2533 02:47:11,120 --> 02:47:16,600 However, I will clarify for this request, the SCP will offer production of the fertilizers 2534 02:47:16,600 --> 02:47:23,840 and bio-stimulant products at 4951 and 5001 Codelane, whereas 5071 Codelane will be utilized 2535 02:47:23,840 --> 02:47:33,680 to store empty totes, raw materials, and other finished bio-stimulant products in totes containers. 2536 02:47:33,680 --> 02:47:39,260 It is a part of this overall manufacturing and distribution process, which is why it's 2537 02:47:39,260 --> 02:47:44,040 being considered in this request. 2538 02:47:44,040 --> 02:47:50,960 I actually spoke to this and I'll just bring it back up. 2539 02:47:50,960 --> 02:47:57,800 The history of 4951, the applicant initially leased 4951 to Codelane in 2011 with the plan 2540 02:47:57,800 --> 02:48:01,440 to build a production system to produce its original bio-stimulant product. 2541 02:48:01,440 --> 02:48:08,240 At this time, the building had a CEO for heavy manufacturing that related back to the buildings 2542 02:48:08,240 --> 02:48:10,320 used prior to the annexation. 2543 02:48:10,320 --> 02:48:16,560 In 2016, the applicant expanded and leased its second building at 5001 Dakota and followed 2544 02:48:16,560 --> 02:48:19,120 the same CEO process that it had for the first building. 2545 02:48:19,120 --> 02:48:24,080 The applicant initially uses property for storage, but starting in late 2017, it constructed 2546 02:48:24,080 --> 02:48:28,320 production systems for its newer bio-stimulant technologies. 2547 02:48:28,320 --> 02:48:32,600 These production systems are similar to the ones used in 4951. 2548 02:48:32,600 --> 02:48:39,880 Finally, in 2022, the applicant expanded again and leased its third building at 5071 Dakota 2549 02:48:39,880 --> 02:48:46,000 to use solely for storage of empty totes, which are material containers, raw materials 2550 02:48:46,000 --> 02:48:52,720 used to produce the company's products, and final finished bio-stimulant products. 2551 02:48:52,720 --> 02:48:59,880 Again, the uses in these sites are consistent with the future land use element of the comprehensive 2552 02:48:59,880 --> 02:49:02,240 plan. 2553 02:49:02,240 --> 02:49:06,920 Once again, these sites are surrounded by heavy industrial, with the exception of the 2554 02:49:06,920 --> 02:49:13,520 ETJ to the south, as well as various industrial uses, including light manufacturing, distribution, 2555 02:49:13,520 --> 02:49:21,040 warehousing, automotive repair, and that same trade school now to the northeast. 2556 02:49:21,040 --> 02:49:28,000 Again, the neighborhood outreach was done for these sites in conjunction with the site 2557 02:49:28,000 --> 02:49:34,040 for S24-3, and feedback was still positive. 2558 02:49:34,040 --> 02:49:40,720 As I mentioned earlier, the applicant business owner is here to answer technical operational 2559 02:49:40,720 --> 02:49:44,520 questions, and I'll be here as well. 2560 02:49:44,520 --> 02:49:47,640 Thank you, Mr. Griffin. 2561 02:49:47,640 --> 02:49:48,640 Questions at the moment? 2562 02:49:48,640 --> 02:49:55,160 I think I've got a question just about this bio-stimulant, if I could ask one. 2563 02:49:55,160 --> 02:49:56,160 Sure. 2564 02:49:56,160 --> 02:50:04,040 You said it's newer, so I'm wondering what the difference is, and if it can be done in 2565 02:50:04,040 --> 02:50:07,360 a not-super-technical way that we could understand. 2566 02:50:07,360 --> 02:50:14,080 I don't know if that's a question that can be done like that or not. 2567 02:50:14,080 --> 02:50:15,080 Hi. 2568 02:50:15,080 --> 02:50:16,080 My name is John Wolfe. 2569 02:50:16,080 --> 02:50:21,160 I'm the chief operating officer of Advanced Microbial Solutions. 2570 02:50:21,160 --> 02:50:26,200 Basically the difference here is these are fermentation tanks that are serialized so 2571 02:50:26,200 --> 02:50:31,240 that water flows from one tank to the next, and it consumes whatever organic feedstock 2572 02:50:31,240 --> 02:50:32,400 you put in there. 2573 02:50:32,400 --> 02:50:37,100 We direct these to make certain kinds of microbes that do different things. 2574 02:50:37,100 --> 02:50:43,760 This newest one is just designed to help us get corn, primarily corn plants to fix nitrogen 2575 02:50:43,760 --> 02:50:49,080 from the atmosphere, reduce the amount of nitrogen we apply to corn crops. 2576 02:50:49,080 --> 02:50:50,080 I think you did very well. 2577 02:50:50,080 --> 02:50:51,560 I actually understood that. 2578 02:50:51,560 --> 02:50:52,560 All right. 2579 02:50:52,560 --> 02:50:57,480 I have to explain it to my son a lot so that if I can do that, it helps. 2580 02:50:57,480 --> 02:50:58,480 Any other questions? 2581 02:50:58,480 --> 02:50:59,480 Yeah. 2582 02:50:59,480 --> 02:51:00,480 I don't think so. 2583 02:51:00,480 --> 02:51:01,480 Thank you very much for that. 2584 02:51:01,480 --> 02:51:02,480 Appreciate that. 2585 02:51:02,480 --> 02:51:06,160 I don't have any other cards in front of me. 2586 02:51:06,160 --> 02:51:08,880 Is there anyone else wishing to speak who has not? 2587 02:51:08,880 --> 02:51:12,400 There should be like one only person here, okay? 2588 02:51:12,400 --> 02:51:13,400 Very good. 2589 02:51:13,400 --> 02:51:14,400 Very good. 2590 02:51:14,400 --> 02:51:28,360 Okay, with that, I will go ahead and close the public hearing for 5D S240003 and 5E S240004, 2591 02:51:28,360 --> 02:51:31,600 and I will open the floor for a motion or discussion. 2592 02:51:31,600 --> 02:51:32,600 Commissioner Cole. 2593 02:51:32,600 --> 02:51:35,880 I'll make a motion to approve. 2594 02:51:35,880 --> 02:51:36,880 Commissioner Pruitt? 2595 02:51:36,880 --> 02:51:37,880 Second. 2596 02:51:37,880 --> 02:51:38,880 Okay. 2597 02:51:38,880 --> 02:51:49,840 I need to clarify, because these had differing conditions, I should have said that before 2598 02:51:49,840 --> 02:51:50,840 that. 2599 02:51:50,840 --> 02:51:52,880 We need to take these one motion at a time. 2600 02:51:52,880 --> 02:51:56,280 So we're looking at 5D here. 2601 02:51:56,280 --> 02:51:59,880 I will ask S240003. 2602 02:51:59,880 --> 02:52:05,480 So Commissioner Cole, are you good with your to approve 5D? 2603 02:52:05,480 --> 02:52:06,480 Commissioner Pruitt? 2604 02:52:06,480 --> 02:52:07,480 Yes. 2605 02:52:07,480 --> 02:52:08,480 So second. 2606 02:52:08,480 --> 02:52:19,240 I will make a motion to approve 5D S240003 with staff's conditions as presented. 2607 02:52:19,240 --> 02:52:21,000 Okay. 2608 02:52:21,000 --> 02:52:23,120 Any discussion? 2609 02:52:23,120 --> 02:52:25,440 Before we vote, can I just say thank you, Ashley. 2610 02:52:25,440 --> 02:52:26,440 Thank you, Mr. Copeland. 2611 02:52:26,440 --> 02:52:28,720 The backup material was fantastic on this. 2612 02:52:28,720 --> 02:52:34,040 I will say when I first read just the AIS, I was like, oh, my gosh, you know, what is 2613 02:52:34,040 --> 02:52:38,240 -- and as I delved into it, and it was still -- I mean, it took a minute. 2614 02:52:38,240 --> 02:52:43,720 But you presented it so well, the narrative was great, so that we really could understand 2615 02:52:43,720 --> 02:52:45,620 exactly what was being asked. 2616 02:52:45,620 --> 02:52:46,620 So well done. 2617 02:52:46,620 --> 02:52:47,880 Thank you very much. 2618 02:52:47,880 --> 02:52:56,040 Let's go ahead and vote, please. 2619 02:52:56,040 --> 02:52:57,640 That motion will carry 6-0. 2620 02:52:57,640 --> 02:53:03,080 That will take us to then the vote on 5E, S240004. 2621 02:53:03,080 --> 02:53:04,080 Commissioner Thaggard? 2622 02:53:04,080 --> 02:53:05,080 I make a motion to approve. 2623 02:53:05,080 --> 02:53:09,280 Is that with staff's conditions as presented? 2624 02:53:09,280 --> 02:53:10,280 Commissioner Pergero? 2625 02:53:10,280 --> 02:53:11,280 I second. 2626 02:53:11,280 --> 02:53:12,280 Okay. 2627 02:53:12,280 --> 02:53:18,320 We've got a first and a second for approval of item 5E, S240004. 2628 02:53:18,320 --> 02:53:19,920 Any discussion? 2629 02:53:19,920 --> 02:53:21,020 Okay. 2630 02:53:21,020 --> 02:53:28,800 Let's go ahead and vote, please. 2631 02:53:28,800 --> 02:53:31,960 That motion carries 6-0. 2632 02:53:31,960 --> 02:53:39,920 And that will take us to our final public hearing item for the night, which is 5F, DCA240003. 2633 02:53:39,920 --> 02:53:43,880 I will open the public hearing, and Angie is here for presentation. 2634 02:53:43,880 --> 02:53:45,480 Thank you. 2635 02:53:45,480 --> 02:53:48,480 Thank you, Chair. 2636 02:53:48,480 --> 02:53:51,640 Just one second. 2637 02:53:51,640 --> 02:53:52,640 Good evening. 2638 02:53:52,640 --> 02:53:54,140 Angie Manglaris, Development Review Manager. 2639 02:53:54,140 --> 02:54:01,560 This is DCA240003, amendments to the Debt and Development Code as it relates to conflicts 2640 02:54:01,560 --> 02:54:04,660 with other ordinances and criteria manuals. 2641 02:54:04,660 --> 02:54:06,560 So a little bit of background on this proposal. 2642 02:54:06,560 --> 02:54:11,400 This is amendments to sections 1.3.4 of the DDC. 2643 02:54:11,400 --> 02:54:15,760 This is the section that spells out really conflicts with other ordinances as well as 2644 02:54:15,760 --> 02:54:19,040 criteria manuals in the Denton Development Code. 2645 02:54:19,040 --> 02:54:24,440 On June 4th, 2024, the City Council adopted the new Denton Design Criteria Manual. 2646 02:54:24,440 --> 02:54:29,640 The Denton Design Criteria Manual consolidates our existing criteria manuals into one comprehensive 2647 02:54:29,640 --> 02:54:34,360 manual and also specifies that in the event of conflict between the Denton Design Criteria 2648 02:54:34,360 --> 02:54:38,800 Manual and the Denton Development Code, the Denton Design Criteria Manual shall not supersede 2649 02:54:38,800 --> 02:54:40,120 the DDC. 2650 02:54:40,120 --> 02:54:42,640 As it is today, we do have some conflicting language. 2651 02:54:42,640 --> 02:54:48,400 As section 1.3.4 specifies that in the event of conflict with the DDC and criteria manuals, 2652 02:54:48,400 --> 02:54:50,800 the criteria manuals shall govern. 2653 02:54:50,800 --> 02:54:55,560 And really the purpose of the DDC is to establish the subdivision and design standards for land 2654 02:54:55,560 --> 02:54:59,200 regulations to carry out the goals of the comprehensive plan. 2655 02:54:59,200 --> 02:55:03,080 The new manuals are intended to provide the supplemental technical detail that we need 2656 02:55:03,080 --> 02:55:05,480 to carry out the provisions of the DDC. 2657 02:55:05,480 --> 02:55:11,640 So we do really want the DDC and its regulations to control in the event of conflict. 2658 02:55:11,640 --> 02:55:15,480 While we're in this section of the DDC, there are just some additional amendments that needed 2659 02:55:15,480 --> 02:55:19,840 to be made to remove references to manuals that we no longer use as well as just clean 2660 02:55:19,840 --> 02:55:21,060 up some names. 2661 02:55:21,060 --> 02:55:24,080 So the proposed amendments are here before you. 2662 02:55:24,080 --> 02:55:29,000 Again, correcting that the Denton Development Code shall govern in the event of conflict 2663 02:55:29,000 --> 02:55:35,320 as well as calling out that our criteria manuals are now in one consolidated manual. 2664 02:55:35,320 --> 02:55:38,720 Although I do apologize, this needs to be indented in a little bit further. 2665 02:55:38,720 --> 02:55:42,460 But this does address the creation of the Denton Design Criteria Manual, which houses 2666 02:55:42,460 --> 02:55:47,880 all of our existing criteria manuals and also moves to amending these criteria manuals as 2667 02:55:47,880 --> 02:55:48,880 needed. 2668 02:55:48,880 --> 02:55:52,000 I believe before it was called out as a yearly basis, so we're shifting that to when the 2669 02:55:52,000 --> 02:55:55,760 need arises for criteria manual amendments. 2670 02:55:55,760 --> 02:55:59,580 Having said all of that, this is consistent with our criteria for approval for text amendments 2671 02:55:59,580 --> 02:56:03,840 and staff is recommending approval as the amendments as presented and the next step 2672 02:56:03,840 --> 02:56:05,600 is City Council in July. 2673 02:56:05,600 --> 02:56:10,200 I'm happy to answer any questions you may have. 2674 02:56:10,200 --> 02:56:13,040 Questions for Angie? 2675 02:56:13,040 --> 02:56:14,040 Thank you very much. 2676 02:56:14,040 --> 02:56:15,040 Thank you. 2677 02:56:15,040 --> 02:56:16,040 Okay. 2678 02:56:16,040 --> 02:56:17,040 This is a public hearing. 2679 02:56:17,040 --> 02:56:21,880 There is no one but staff left in front of me, so I'm going to go ahead and close the 2680 02:56:21,880 --> 02:56:30,740 public hearing and open the floor for a motion or discussion on the item. 2681 02:56:30,740 --> 02:56:31,740 Commissioner Villarreal. 2682 02:56:31,740 --> 02:56:33,740 Move approval. 2683 02:56:33,740 --> 02:56:34,740 Commissioner Cole? 2684 02:56:34,740 --> 02:56:35,740 Second. 2685 02:56:35,740 --> 02:56:36,740 Okay. 2686 02:56:36,740 --> 02:56:38,600 Got a first and a second for approval discussion. 2687 02:56:38,600 --> 02:56:39,600 Okay. 2688 02:56:39,600 --> 02:56:46,920 Let's go ahead and vote, please. 2689 02:56:46,920 --> 02:56:48,520 That motion carries 6-0. 2690 02:56:48,520 --> 02:56:54,520 That will take us to our matrix, item 6-A, and I will turn it over to Tina. 2691 02:56:54,520 --> 02:56:56,640 Thank you, Chair Ellis. 2692 02:56:56,640 --> 02:57:00,600 So with respect to the matrix, there were no additional items added at your last meeting, 2693 02:57:00,600 --> 02:57:05,920 so that remained as is given that we had the discussion regarding the P&Z reconsideration 2694 02:57:05,920 --> 02:57:09,680 process and the matrix will go ahead and remove that as we continue to move that item forward 2695 02:57:09,680 --> 02:57:12,360 from a public hearing perspective. 2696 02:57:12,360 --> 02:57:14,080 Several updates for you. 2697 02:57:14,080 --> 02:57:20,200 So the Southeast Denton area plan, we are in the final stretch of trying to wrap up 2698 02:57:20,200 --> 02:57:21,200 that project. 2699 02:57:21,200 --> 02:57:24,520 So a few items that you might be interested in. 2700 02:57:24,520 --> 02:57:30,760 So we're trying to get our steering committee to be able to meet on June 20th, so we anticipate 2701 02:57:30,760 --> 02:57:32,240 that occurring. 2702 02:57:32,240 --> 02:57:36,220 The team is going to be doing additional engagement activities with the Juneteenth celebrations 2703 02:57:36,220 --> 02:57:37,680 that are happening this weekend. 2704 02:57:37,680 --> 02:57:42,700 Excuse me just a moment. 2705 02:57:42,700 --> 02:57:48,740 We also have slated for July 17th a special called Planning and Zoning Commission meeting 2706 02:57:48,740 --> 02:57:50,800 to be able to consider this item. 2707 02:57:50,800 --> 02:57:59,680 So we're proposing to bring forth the draft plan for your consideration and we also have 2708 02:57:59,680 --> 02:58:00,680 -- oh, I skipped a date. 2709 02:58:00,680 --> 02:58:01,680 Hold on. 2710 02:58:01,680 --> 02:58:02,680 Before we get to that. 2711 02:58:02,680 --> 02:58:07,480 So we'll have a P&Z discussion on June 26th, because we promised you at our joint meeting 2712 02:58:07,480 --> 02:58:10,920 that we would bring the action items before the commission for your consideration, so 2713 02:58:10,920 --> 02:58:12,440 we'll be doing that in the work session. 2714 02:58:12,440 --> 02:58:14,840 So I'm presuming all of that goes well. 2715 02:58:14,840 --> 02:58:20,160 Then we're proposing to then bring the plan forward for the July 7th special called meeting. 2716 02:58:20,160 --> 02:58:23,800 If you have not done so, if you could please let Kathy know your availability so we can 2717 02:58:23,800 --> 02:58:25,720 ensure that we've got quorum. 2718 02:58:25,720 --> 02:58:30,200 Also we may be scheduling some additional public hearings for that meeting as well since 2719 02:58:30,200 --> 02:58:37,600 we've asked you to come in for that, but we'll start July 17th and that is a Wednesday. 2720 02:58:37,600 --> 02:58:42,360 But anyway, so hopefully we'll be able to have that project before you on the 17th. 2721 02:58:42,360 --> 02:58:47,020 With all of our intention, we're currently reviewing the final draft -- or the draft 2722 02:58:47,020 --> 02:58:48,020 document. 2723 02:58:48,020 --> 02:58:52,600 I'm looking at Mia, so she and Julia put so much hard work into this, but we anticipate 2724 02:58:52,600 --> 02:58:53,880 being able to move forward with that. 2725 02:58:53,880 --> 02:58:58,600 And then once we have -- if the commission is able to successfully recommend approval 2726 02:58:58,600 --> 02:59:03,320 at your meeting on the 17th of July, then we would get that scheduled for council and 2727 02:59:03,320 --> 02:59:08,920 I believe the date we're targeting for that is July 23rd for that project. 2728 02:59:08,920 --> 02:59:13,120 It's kind of a race between Mia and Julia and Cameron and Sean, so with the two projects 2729 02:59:13,120 --> 02:59:14,120 going on. 2730 02:59:14,120 --> 02:59:17,720 Downtown, you know, we continue to work on that. 2731 02:59:17,720 --> 02:59:23,400 That one -- we just received the draft document plan on that as well and so we've pretty much 2732 02:59:23,400 --> 02:59:26,000 finished our work, I believe, with the steering committee. 2733 02:59:26,000 --> 02:59:30,880 We will be looking forward to bringing that to the commission here in the very near future 2734 02:59:30,880 --> 02:59:33,520 also for your consideration. 2735 02:59:33,520 --> 02:59:39,600 And right now I believe we are targeting your July 24th meeting date for that. 2736 02:59:39,600 --> 02:59:45,460 In terms of projects that you all took action on at your last meeting and their outcome 2737 02:59:45,460 --> 02:59:49,920 at council, so if you recall, Mia worked on an amendment to the debt and development code 2738 02:59:49,920 --> 02:59:52,360 to address donation boxes. 2739 02:59:52,360 --> 02:59:56,840 Council did approve those ordinance amendments as presented, which was as recommended by 2740 02:59:56,840 --> 02:59:57,840 the commission. 2741 02:59:57,840 --> 03:00:02,480 Short-term rentals continues to live on. 2742 03:00:02,480 --> 03:00:08,840 That went before council and they continued that to the July 23rd meeting date to allow 2743 03:00:08,840 --> 03:00:12,240 staff to be able to meet with local realtors group. 2744 03:00:12,240 --> 03:00:16,520 There's some concern amongst local realtors that the proposed registration requirement 2745 03:00:16,520 --> 03:00:21,360 will lead to a rental registration program here within the city for all rental properties. 2746 03:00:21,360 --> 03:00:29,480 So I believe we have that meeting scheduled for July 20th and so we'll be meeting with 2747 03:00:29,480 --> 03:00:33,460 them and then going back to council on July 23rd. 2748 03:00:33,460 --> 03:00:35,600 That concludes my report, so thank you. 2749 03:00:35,600 --> 03:00:37,280 Thank you. 2750 03:00:37,280 --> 03:00:39,040 Anything to add to the matrix? 2751 03:00:39,040 --> 03:00:40,040 Commissioner Pruitt. 2752 03:00:40,040 --> 03:00:44,600 So nothing specifically to add, but I know earlier in the work session today we had talked 2753 03:00:44,600 --> 03:00:52,840 about the community engagement incentives policy and method of doing that. 2754 03:00:52,840 --> 03:01:00,560 And we talked about pushing or bringing that back at the next meeting on June 26th. 2755 03:01:00,560 --> 03:01:07,200 I think our agenda is stacking up to be pretty full with lots of public hearing on June 26th. 2756 03:01:07,200 --> 03:01:12,540 So I was just going to offer a suggestion that if it makes more sense to hold that after 2757 03:01:12,540 --> 03:01:22,340 the Southeast Denton discussion ... You're still not on. 2758 03:01:22,340 --> 03:01:28,720 On our special call meeting on July 17th, if that gives staff more time to prepare and 2759 03:01:28,720 --> 03:01:35,400 removes the schedule pressure of a full agenda, I think that's fine with me anyway. 2760 03:01:35,400 --> 03:01:37,040 Yeah, I appreciate that suggestion. 2761 03:01:37,040 --> 03:01:40,840 I think we're in a position where we could at least bring that item back for a work session 2762 03:01:40,840 --> 03:01:46,100 discussion because I know we've got a good solid draft already assembled. 2763 03:01:46,100 --> 03:01:49,960 We were not able to get it completed in time for this meeting, but I think we'll be in 2764 03:01:49,960 --> 03:01:50,960 good shape. 2765 03:01:50,960 --> 03:01:54,960 So it's good to know that that offer is out there. 2766 03:01:54,960 --> 03:01:55,960 Thank you. 2767 03:01:55,960 --> 03:01:56,960 Yes. 2768 03:01:56,960 --> 03:01:58,600 Anything else for the matrix? 2769 03:01:58,600 --> 03:01:59,600 Concluding items? 2770 03:01:59,600 --> 03:02:00,600 Okay. 2771 03:02:00,600 --> 03:02:09,120 Well, with that, I want to thank you all, thank staff for being awesome, and I will 2772 03:02:09,120 --> 03:02:10,920 adjourn us at 8.28 PM. 2773 03:02:10,920 --> 03:02:13,120 See you at the next one.