00:00:00.000 --> 00:00:07.160
 Good evening my name is Rosa Rios and I am your city secretary the time right

00:00:07.160 --> 00:00:12.600
 now is 531 and in the absence of the chair and the vice chair the city

00:00:12.600 --> 00:00:18.600
 secretary will has called the meeting to order under Robert's Rules of Orders the

00:00:18.600 --> 00:00:23.720
 the board does have the ability to appoint a temporary chair the appointment

00:00:23.720 --> 00:00:27.760
 will be for the duration of the meeting and the responsibilities will cease

00:00:27.760 --> 00:00:33.700
 once the meeting is adjourned I will now take nominations on the floor

00:00:33.700 --> 00:00:52.200
 are there any other nominations any other nominations with no other

00:00:52.200 --> 00:00:58.840
 nominations I will now take so we have a man make that a formal motion sir we

00:00:58.840 --> 00:01:06.880
 have a motion and we have a second so there's the nomination for board member

00:01:06.880 --> 00:01:11.440
 Tim Crouch to serve as your temporary chair for this meeting all in favor

00:01:11.440 --> 00:01:20.920
 please raise your right hand all opposed the motion carries with the majority

00:01:20.920 --> 00:01:25.160
 vote your meeting will continue and your next item on the agenda is public

00:01:25.160 --> 00:01:29.080
 comments and individuals are allowed three minutes to speak I'll now turn the

00:01:29.080 --> 00:01:37.760
 meeting over all right and do we have cards we have cards and and let me just

00:01:37.760 --> 00:01:42.240
 remind the committee that that it's important to leave your microphone turned

00:01:42.240 --> 00:01:47.240
 on so don't turn your microphone on and off but leave it turned on so that if

00:01:47.240 --> 00:01:52.640
 you start speaking it gets picked up on the on the streaming and of the meeting

00:01:52.640 --> 00:02:05.160
 here so our the the first person I'd like to call is Rick would Rick would if

00:02:05.160 --> 00:02:09.980
 you would come to the microphone up here at the podium please you have three

00:02:09.980 --> 00:02:22.880
 minutes yeah we'll need your name and address if you would Rick would 80 11

00:02:22.880 --> 00:02:28.000
 Wood Creek Circle Argyle Texas seven six two two six within the Denton city

00:02:28.000 --> 00:02:34.240
 limits and I just want to speak use my three minutes to address some concerns

00:02:34.240 --> 00:02:40.480
 around the current proposal that would involve the widening of brush Creek Road

00:02:40.480 --> 00:02:50.320
 near our neighborhood this will have a significant impact upon the residents of

00:02:50.320 --> 00:02:54.520
 that section of town and we believe a large majority of us believe that it's

00:02:54.520 --> 00:03:01.880
 largely unnecessary and maybe a better use of funds could be applied to fixing

00:03:01.880 --> 00:03:06.640
 the current street conditions within the city according to the Denton record

00:03:06.640 --> 00:03:12.000
 Chronicle in April of last year in an article didn't had a street score of 65

00:03:12.000 --> 00:03:19.040
 compared with a flower mound which had an 81 and Frisco as an example had a

00:03:19.040 --> 00:03:27.000
 score of 95 according to that same article 25% of the 1314 lane miles were

00:03:27.000 --> 00:03:34.760
 in poor condition that's about 328 lane miles Cindy City engineer Todd Estes

00:03:34.760 --> 00:03:39.600
 told the council that there were 200 street segments to rebuild the financing

00:03:39.600 --> 00:03:43.600
 for that was approved through a 44 million dollar combined bond package into

00:03:43.600 --> 00:03:51.000
 2012 and 2014 ultimately the city will need to budget more for maintenance to

00:03:51.000 --> 00:03:59.000
 maintain what we have and the each year and according to mr. Krummer there was a

00:03:59.000 --> 00:04:05.480
 next to an estimated 335 lane miles would cost about 193 million dollars to

00:04:05.480 --> 00:04:10.120
 rebuild today previous bond packages that have gone to the voters were

00:04:10.120 --> 00:04:17.240
 underestimated by 30 to 40 percent if this were to go to an election and to a

00:04:17.240 --> 00:04:22.800
 bond approval we would be concerned that the money used to widen that

00:04:22.800 --> 00:04:28.160
 particular section of road could be better applied against the current

00:04:28.160 --> 00:04:35.440
 infrastructure improvements that are needed around the city today to quote

00:04:35.440 --> 00:04:41.240
 mr. Heilman it's last year in April it's not going to matter how much maintenance

00:04:41.240 --> 00:04:45.560
 funding there is if the roads aren't built right to begin with so instead of

00:04:45.560 --> 00:04:50.440
 widening brush Creek and potentially displacing dozens of residents I would

00:04:50.440 --> 00:04:55.080
 ask the committee to consider reinvesting that money into our current

00:04:55.080 --> 00:05:02.760
 infrastructure and improving the roads we have thank you next Jennifer Lane

00:05:02.760 --> 00:05:12.720
 Jennifer Lane I don't think there'll be an opportunity for public comment on

00:05:12.720 --> 00:05:18.980
 items later if you want to speak you'll need to do that now okay next is Richard

00:05:18.980 --> 00:05:21.600
 Shan house

00:05:21.600 --> 00:05:38.560
 my name is Richard Shan house my address is eight zero zero one Wood Creek Circle

00:05:38.560 --> 00:05:48.280
 in Argyle neighbor for mr. Woods and our interest is in the destruction of

00:05:48.280 --> 00:05:55.600
 property that will happen if you're and I spoke last week as well my garage and

00:05:55.600 --> 00:06:00.640
 my yard will be will be eliminated consequently my whole house will be

00:06:00.640 --> 00:06:09.400
 rendered uninhabitable if a fork if a divided six lane highway with bike paths

00:06:09.400 --> 00:06:19.640
 and and and sidewalks and easement come into come into being so I'm carrying the

00:06:19.640 --> 00:06:25.000
 flag for a number of residents in our area that that are particularly and

00:06:25.000 --> 00:06:31.840
 specifically involved because we would lose our homes and it seemed as though

00:06:31.840 --> 00:06:38.280
 the last time I spoke here you guys at least some of you guys were unaware that

00:06:38.280 --> 00:06:44.280
 that properties would be displaced and you know we put our heart and soul into

00:06:44.280 --> 00:06:48.040
 our properties and it's kind of hard to see the city come along and and and

00:06:48.040 --> 00:06:57.240
 propose a building a wide wide road through an area that is where the

00:06:57.240 --> 00:07:04.600
 traffic is just not doesn't doesn't make sense I think you're the idea from the

00:07:04.600 --> 00:07:09.320
 city from the head engineer was if we build it they will come the traffic and

00:07:09.320 --> 00:07:16.200
 you know brush Creek dead ends into 377 and beyond where and West beyond that is

00:07:16.200 --> 00:07:23.840
 nothing but farmland which would extend to highway 35w where there is no

00:07:23.840 --> 00:07:32.020
 interchange so it's it seems as though that extension and all the displacement

00:07:32.020 --> 00:07:38.680
 and the buying of properties and I would it wouldn't make as much sense as a

00:07:38.680 --> 00:07:44.560
 proposal that we made to the council last week that was in the letter that

00:07:44.560 --> 00:07:53.640
 was sent to the advisory board you guys to to Ryan Adams and others I've got a

00:07:53.640 --> 00:07:59.360
 copy of it if anybody if I can leave it with somebody so that you know refresh

00:07:59.360 --> 00:08:07.840
 your memory about it's very particular about a different proposal that you know

00:08:07.840 --> 00:08:15.880
 seems to you know seems to us so much more meaningful when it comes to how it

00:08:15.880 --> 00:08:24.520
 connects to 35 and how it hooks into joins the proposed loop 288 extension

00:08:24.520 --> 00:08:31.520
 and in joining together with an already proposed widening of a road that up that

00:08:31.520 --> 00:08:45.520
 way if I could leave this with somebody I would like to your time your time is

00:08:45.520 --> 00:08:54.560
 up and again to use that money for roads that are and have been in dire need of

00:08:54.560 --> 00:09:12.840
 denting in other areas thank you thank you next is Dennis Cox I want to begin

00:09:12.840 --> 00:09:17.880
 by thanking all of y'all for that I know the time you put in you have you sit

00:09:17.880 --> 00:09:21.960
 through the meetings everything you hear all the input everybody has their own

00:09:21.960 --> 00:09:27.600
 concerns for whatever is being done to their roads just as we have concerns for

00:09:27.600 --> 00:09:32.400
 ours and I appreciate the time that y'all put in and the consideration that

00:09:32.400 --> 00:09:38.760
 you'll give on what you recommend to the council as far as the road repairs first

00:09:38.760 --> 00:09:44.600
 of all my wife and I walk that Breast Creek Road frequently at different times

00:09:44.600 --> 00:09:50.000
 of the day and I would say on the average in a week of us and we try to

00:09:50.000 --> 00:09:55.240
 walk every day but sometimes it works out to about three days week depending on

00:09:55.240 --> 00:10:01.640
 how hot it is eight to twenty vehicles you know at a maximum pass us when we're

00:10:01.640 --> 00:10:09.420
 walking I don't know what studies have been committed to see what the future

00:10:09.420 --> 00:10:15.800
 traffic would be if it was expanded I for some reason I can in my mind see

00:10:15.800 --> 00:10:22.340
 where it would expand where it would need a six lane divided road so I would

00:10:22.340 --> 00:10:27.120
 hope that somebody is doing all the research and all the calculations to make

00:10:27.120 --> 00:10:34.080
 sure that it's needed and and I agree with with what Rick would said and that

00:10:34.080 --> 00:10:39.180
 is you know there's a lot of city streets and everything that need a lot

00:10:39.180 --> 00:10:42.800
 of attention for that money could be better spent at this time maybe in the

00:10:42.800 --> 00:10:51.040
 future that might be a good idea second of all the two concerns if it does go

00:10:51.040 --> 00:10:56.640
 through it's gonna wipe out the Apple's house and Dick's house and I'm the

00:10:56.640 --> 00:11:01.520
 second house in on the on the cul-de-sac there and even if it doesn't wipe out

00:11:01.520 --> 00:11:07.000
 their house I would be concerned about the the noise and I would wonder if if

00:11:07.000 --> 00:11:14.020
 this bond proposal includes the sound barrier wall that runs down that road

00:11:14.020 --> 00:11:21.320
 to to keep some of the sound away because I know on 2499 they have a nice

00:11:21.320 --> 00:11:25.400
 sound barrier wall down through there so I would hope that something is being

00:11:25.400 --> 00:11:31.600
 included in that another is the drainage I have on the backside of my pool about

00:11:31.600 --> 00:11:37.320
 an 8-foot retaining wall and when they built that development behind us they

00:11:37.320 --> 00:11:44.800
 put in the city put in three pipes that dump into that creek there we've had

00:11:44.800 --> 00:11:49.360
 water come up almost over the top of that retaining wall and we've had a

00:11:49.360 --> 00:11:58.360
 trampoline washed down the stream a brick seat that we sit on down there for

00:11:58.360 --> 00:12:02.480
 little fireplaces washed down through there so I'll be concerned about how

00:12:02.480 --> 00:12:06.680
 this is gonna affect the drainage whether it will or not I don't know I'm

00:12:06.680 --> 00:12:10.320
 sure there's some engineers that would be able to answer that question for you

00:12:10.320 --> 00:12:14.720
 and I would hope that you would inquire about that before making your decision

00:12:14.720 --> 00:12:18.680
 Dennis your time is up would you give your address also please

00:12:18.680 --> 00:12:42.520
 oh it's 8008 Wood Creek Circle thank you very much next up David Yoder my name is

00:12:42.520 --> 00:12:48.200
 David Yoder I live at 940 and 950 brush Creek Road I am technically in the

00:12:48.200 --> 00:12:55.400
 county but I am in Denton's ETJ we've lived there since 1986 and the ideal of

00:12:55.400 --> 00:13:00.200
 six lanes coming down brush Creek Road takes away half my front yard in both

00:13:00.200 --> 00:13:05.640
 pieces of my property and I think part of what we're trying to get clarification

00:13:05.640 --> 00:13:10.520
 is is for for not knowing what y'all are calling it I call it Hicker Creek West

00:13:10.520 --> 00:13:18.320
 and that is from River Pass to 1830 is that in this bond package the next one

00:13:18.320 --> 00:13:23.440
 is from 1830 all the way down brush Creek Road to 377 and the third one is

00:13:23.440 --> 00:13:28.920
 from 377 all the way up to 35 so at this point I'll even know I can't find

00:13:28.920 --> 00:13:33.240
 anything that tells me what all's in the package that you all are proposing or is

00:13:33.240 --> 00:13:38.680
 the piece from River Pass to three 1830 even in this package because if not

00:13:38.680 --> 00:13:41.000
 we're probably talking to the wrong folks you probably need to go talk to

00:13:41.000 --> 00:13:46.600
 the mobility people so I'd like clarification on that and if any of the

00:13:46.600 --> 00:13:51.640
 three projects that are proposed why is it why is it coming in this package

00:13:51.640 --> 00:13:55.360
 instead of waiting on till the mobility study is completed which I understand is

00:13:55.360 --> 00:14:00.600
 supposed to be done in February of 2020 which means then it seems to be getting

00:14:00.600 --> 00:14:06.160
 out ahead of what the city is proposing to do with the package the third one is

00:14:06.160 --> 00:14:11.200
 is can any give us any information I mean basically we're going on state

00:14:11.200 --> 00:14:17.680
 websites county websites city websites nothing shows me what's in the proposal

00:14:17.680 --> 00:14:23.880
 so first thing I think for a lot of us it would be extremely helpful to just

00:14:23.880 --> 00:14:30.240
 know what is being proposed but if if you're going to take 70 feet off the

00:14:30.240 --> 00:14:34.320
 front of my property on two pieces of property you're taking almost a third of

00:14:34.320 --> 00:14:41.160
 my property been there a long time I'm retired I went on found an old windmill

00:14:41.160 --> 00:14:46.080
 restored it put it up make it work I don't want to see it go away thank you

00:14:46.080 --> 00:14:49.240
 thank you

00:14:49.240 --> 00:14:56.480
 next is Troy Fulkerson

00:15:04.880 --> 00:15:11.520
 good afternoon my name is Troy Fulkerson I'm at 8204 Wickwood Court in Argyle and

00:15:11.520 --> 00:15:17.640
 you know my question is is that y'all moved out to Argyle this area about 14

00:15:17.640 --> 00:15:22.500
 years ago was a nice quiet you know Tulane Road been West Creek and I came

00:15:22.500 --> 00:15:25.920
 from Colleyville where Colleyville had the same battle here about ten years ago

00:15:25.920 --> 00:15:29.640
 where they wanted the widened glade road if you guys were familiar with that road

00:15:29.640 --> 00:15:34.280
 from 121 all the way up a policing line it's wonderful several years I don't

00:15:34.280 --> 00:15:37.960
 assure you the traffic on that road on the glade road is probably a hundred

00:15:37.960 --> 00:15:42.040
 times more what it is in West Creek my misunderstanding or maybe not

00:15:42.040 --> 00:15:46.120
 understanding why we want to widened West Creek what's the point we have a

00:15:46.120 --> 00:15:49.600
 county road right down the road which is country club road which just spent you

00:15:49.600 --> 00:15:53.280
 know hundreds of thousands of dollars to make that road that goes all the way 35

00:15:53.280 --> 00:15:58.320
 how about that so why are we spending all these tax dollars on West Creek the

00:15:58.320 --> 00:16:02.000
 county how we spent money on country club road what can't the seat of bitten

00:16:02.000 --> 00:16:05.240
 in the county get together and have a great road is already in the in the

00:16:05.240 --> 00:16:10.400
 infrastructures already there if we want to go any further off off of a country

00:16:10.400 --> 00:16:16.320
 club road we can stand up that direction but my my question this is why that's

00:16:16.320 --> 00:16:19.960
 the whole question why we will spend that kind of taxpayer dollars on a six

00:16:19.960 --> 00:16:24.560
 lane road for a great little neighborhood for what purpose just to

00:16:24.560 --> 00:16:28.800
 spend taxpayer money or can we take this money as the other gentleman said and

00:16:28.800 --> 00:16:32.520
 use it for other purposes but I live in the hills at Argo it's not my properties

00:16:32.520 --> 00:16:36.360
 being ripped out which is the ideal of taxpayer dollars and something that

00:16:36.360 --> 00:16:40.280
 doesn't really need to seem to be done so that being said that's all I gotta

00:16:40.280 --> 00:16:45.160
 say thank you thank you

00:16:45.160 --> 00:16:51.000
 next Gary Davis

00:16:59.320 --> 00:17:06.880
 my name is Gary Davis I live at 970 brush Creek Road in Argyle and what they

00:17:06.880 --> 00:17:11.680
 said to be honest I worked for the city of Keller it took me forever to get here

00:17:11.680 --> 00:17:16.520
 because you can't get here from there with the traffic really we just need I

00:17:16.520 --> 00:17:21.720
 do this same thing for the city of Keller and I know that we're not going

00:17:21.720 --> 00:17:25.600
 to change your mind on the route you're going to go that's already that horse is

00:17:25.600 --> 00:17:30.320
 out of the barn but the thing that I don't know which is what David Yoder said

00:17:30.320 --> 00:17:35.800
 is how many phases are there in this one how far does that take you when do the

00:17:35.800 --> 00:17:42.680
 next phases kick in in a timeline type of format and I don't think that's asking

00:17:42.680 --> 00:17:50.280
 too much and within that format some sort of a map that says you know here's

00:17:50.280 --> 00:17:55.480
 the route it's exactly going to take and here's how much property is going to go

00:17:55.480 --> 00:17:59.440
 from each side I would assume there's going to be some properties that you're

00:17:59.440 --> 00:18:07.520
 going to have to buy out that's okay but none of us really know what that is now

00:18:07.520 --> 00:18:12.560
 the question I have is when you go to the bond election in November I believe

00:18:12.560 --> 00:18:18.760
 it is this if that bond passes is that more than just Denton is that also

00:18:18.760 --> 00:18:23.640
 include County is that also include state whatever funding sources you have

00:18:23.640 --> 00:18:29.880
 is that important does that give you all funding sources if not where the other

00:18:29.880 --> 00:18:35.520
 funding sources kick in also what happens if it doesn't pass I'm sure it's

00:18:35.520 --> 00:18:40.480
 not going to just die you've got to get cars from point A to point B what's plan

00:18:40.480 --> 00:18:46.600
 B what happens when you do pass it what happens if you don't where the funding

00:18:46.600 --> 00:18:50.720
 sources come in and what's the timeline for each one of those that's what I have

00:18:50.720 --> 00:18:56.800
 to do with all of ours have to lay out straight maps aerials always help

00:18:56.800 --> 00:19:00.720
 aerials with dotted lines that show where it's going to go that's what we

00:19:00.720 --> 00:19:08.320
 know with a timeline thank you so much thank you and I have one of the card

00:19:08.320 --> 00:19:16.040
 with but something written on it but I have no name okay

00:19:21.220 --> 00:19:30.760
 good evening my name is Sam Slovak I live at 4905 Argyle Lane which is the

00:19:30.760 --> 00:19:37.520
 corner of Argyle Lane and Brush Creek a six lane major highway cutting through a

00:19:37.520 --> 00:19:43.680
 pristine area of Denton which many of us bought in that area for that very reason

00:19:43.680 --> 00:19:50.480
 will completely change the character of those neighborhoods as you put in a road

00:19:50.480 --> 00:19:55.800
 of this size and I look at the studies that have been issued you know they're

00:19:55.800 --> 00:20:03.120
 still talking about rural culvert for drainage you take drainage off of a six

00:20:03.120 --> 00:20:09.440
 lane highway and and that highway will be on the south side of all of these

00:20:09.440 --> 00:20:17.040
 homes which backs up to a flood zone so you're going to exacerbate the flooding

00:20:17.040 --> 00:20:23.840
 in all of those homes along the north side of that highway again it's been

00:20:23.840 --> 00:20:28.640
 brought up tonight that you put a road in of this size you're going to

00:20:28.640 --> 00:20:34.720
 significantly increase the noise traffic and there are no provisions in the plans

00:20:34.720 --> 00:20:42.560
 that I've seen that address that issue as well so I for one find it absurd to

00:20:42.560 --> 00:20:50.360
 think that you need a road of this size to be able to accommodate traffic out in

00:20:50.360 --> 00:20:55.920
 2035 when you look at the growth of the industry and the growth of the housing

00:20:55.920 --> 00:21:02.320
 is not not lined up with with the path that you propose to take you're taking

00:21:02.320 --> 00:21:09.120
 an easy way out down a floodplain area to build a massive highway that's going

00:21:09.120 --> 00:21:17.320
 to disrupt the lives and homes of some some very nice homes in the Denton area

00:21:17.320 --> 00:21:24.560
 thank you and the last card that I have is Colleen Mitchell

00:21:35.440 --> 00:21:43.160
 hello I'm Colleen Mitchell I live at 1300 Brush Creek Road in Argyle we've

00:21:43.160 --> 00:21:49.440
 lived in on Brush Creek Road since 2002 our property is on 40 acres and the

00:21:49.440 --> 00:21:53.720
 front of it would actually be taken out but it would not affect our home because

00:21:53.720 --> 00:21:57.640
 our house is way at the back of the property but if any of you have driven

00:21:57.640 --> 00:22:02.160
 down Brush Creek Road you'll see and I followed the men who were setting up the

00:22:02.160 --> 00:22:07.960
 that we're doing the surveying and I said what what are you doing and how how

00:22:07.960 --> 00:22:14.680
 are you going to you're marking these and and here's here's utilities right in

00:22:14.680 --> 00:22:17.520
 front of that do you know how many utilities you're gonna have to take out

00:22:17.520 --> 00:22:23.440
 to widen that road does anyone who realized that a six-lane highway is like

00:22:23.440 --> 00:22:30.120
 1171 drive down 1171 and see six lanes there's no way you can do that to brush

00:22:30.120 --> 00:22:34.760
 Creek Road without taking out so much land on this side and so much land on

00:22:34.760 --> 00:22:41.320
 that side it seems insane maybe make it four lanes because I think going straight

00:22:41.320 --> 00:22:47.200
 to 35w would be really a lot easier I mean it's a straight drop through but

00:22:47.200 --> 00:22:51.120
 don't ruin our properties we've all cared about that property we've all

00:22:51.120 --> 00:22:56.120
 taken care of that property for years and I ask for your attention to more

00:22:56.120 --> 00:23:02.360
 detail on what you're going to do and let us know thank you thank you hi those

00:23:02.360 --> 00:23:08.760
 are all the cards that I have what is your name

00:23:08.760 --> 00:23:18.800
 Perry Dyer

00:23:23.320 --> 00:23:27.960
 well good evening and thank you Perry Dyer 4,800 snowsills no show I don't

00:23:27.960 --> 00:23:32.640
 know how we pronounce it but Argyle it's in the hills of Argyle moved out there

00:23:32.640 --> 00:23:35.760
 just about two years ago I'm from a very small town out in Northern California

00:23:35.760 --> 00:23:40.760
 and it has a lot of charm has a lot of loveliness about it I was living over in

00:23:40.760 --> 00:23:44.880
 Corinth before I found this property with my wife and family and decided this

00:23:44.880 --> 00:23:51.160
 is where we want to spend our time acre lots rural close to everything but not

00:23:51.160 --> 00:23:58.360
 very far out if we decide that we need to create a draw to our area the small

00:23:58.360 --> 00:24:02.920
 town of Argyle the rural area of Rush Creek and those areas in there we're

00:24:02.920 --> 00:24:07.040
 gonna create a draw Roanoke is supposed to go insane in the next few years that

00:24:07.040 --> 00:24:10.560
 draw will move all these people up to our area because they'll be looking to

00:24:10.560 --> 00:24:14.600
 try to get out because we're in a unique situation where we have land for most of

00:24:14.600 --> 00:24:18.560
 us we take that land away we've turned ourselves into every other little city

00:24:18.560 --> 00:24:24.040
 around here and ruined all the charm of Denton South Denton in Argyle we don't

00:24:24.040 --> 00:24:27.840
 want to do that we don't need to have that ultimate convenience it takes a

00:24:27.840 --> 00:24:33.480
 good seven eight minutes to get to 35w from our house it takes 15 minutes if I

00:24:33.480 --> 00:24:39.240
 go the other way to go 35e we live in these areas because we'd like to have a

00:24:39.240 --> 00:24:44.520
 little bit of separation okay if I wanted to be five minutes from the

00:24:44.520 --> 00:24:48.640
 grocery store or five minutes from the restaurant I would go move into any of

00:24:48.640 --> 00:24:52.720
 these surrounding areas that are going gangbusters and are like that so I think

00:24:52.720 --> 00:24:57.480
 we need to take a step back and realize that maybe growth isn't exactly what we

00:24:57.480 --> 00:25:02.120
 need in all these areas and just step back and say let's let some rural areas

00:25:02.120 --> 00:25:06.240
 stay rural and not drive a bunch of traffic into areas because frankly if

00:25:06.240 --> 00:25:10.640
 that lane goes through on Brush Creek and it's six lanes I'm moving because I will

00:25:10.640 --> 00:25:15.600
 not be having that kind of noise I'm a half a mile from that road and it will

00:25:15.600 --> 00:25:19.220
 not have that kind of noise because I'd love to sit on my back patio and look at

00:25:19.220 --> 00:25:26.120
 the stars and not hear traffic so thank you for your time okay thank you and I

00:25:26.120 --> 00:25:29.680
 assume there are not any other cards

00:25:29.680 --> 00:25:35.040
 Jesse Calvert I did see your card

00:25:39.640 --> 00:25:45.480
 hello everybody we recently moved to brush Creek I live on 990 brush Creek

00:25:45.480 --> 00:25:49.160
 road right on the corner of Hamilton and brush Creek I want to talk a little bit

00:25:49.160 --> 00:25:55.400
 about the human element I'll walk my kids to the bus stop right there on the

00:25:55.400 --> 00:26:00.280
 corner of brush Creek and Hamilton the bus stops is great you sit on the front

00:26:00.280 --> 00:26:05.000
 porch sit on the back porch we moved from Dallas to get away from this type of

00:26:05.000 --> 00:26:09.920
 thing I've got 50-foot pine trees in the front of my yard that have been there

00:26:09.920 --> 00:26:14.520
 forever that this would take away and there's a lot more questions that other

00:26:14.520 --> 00:26:20.760
 people have broached but it seems like a waste to me is as far as there's

00:26:20.760 --> 00:26:27.520
 Country Club Road down that's wide enough to me anyway there's a golf course

00:26:27.520 --> 00:26:33.480
 that in my opinion could suffer a bit more than the the residents of brush

00:26:33.480 --> 00:26:40.840
 Creek personally my wife is suffering from three forms of cancer and this is

00:26:40.840 --> 00:26:48.040
 a very large inconvenience to say the least for everybody on our street but it

00:26:48.040 --> 00:26:52.920
 affects I feel like it affects our family horribly just getting the

00:26:52.920 --> 00:26:56.560
 notifications in the mail and all these things have really sent her in a

00:26:56.560 --> 00:27:01.520
 downward spiral with her health and just letting everyone know that there are

00:27:01.520 --> 00:27:06.080
 people involved in all this and it's not just getting people from point 8 point

00:27:06.080 --> 00:27:11.600
 B I understand progress but at what cost and that people have bought it brought

00:27:11.600 --> 00:27:15.080
 up really good points about flooding and it does flood down brush Creek brush

00:27:15.080 --> 00:27:22.280
 Creek a lot but please put in some thought to what we're dealing with and

00:27:22.280 --> 00:27:26.440
 and the questions we have and what's gonna happen with us and with our

00:27:26.440 --> 00:27:32.280
 property and to the the land it's I see this gentleman walk down the street all

00:27:32.280 --> 00:27:37.120
 the time I'm in my yard every day with my family doing things so please

00:27:37.120 --> 00:27:42.560
 consider all these things whenever this comes up thank you thank you did I miss

00:27:42.560 --> 00:27:48.880
 any other cards all right thank you all very much for your comments next item on

00:27:48.880 --> 00:27:52.200
 our agenda is to receive a report and hold a discussion regarding potential

00:27:52.200 --> 00:27:56.840
 projects financial considerations and other requirements related to the

00:27:56.840 --> 00:28:02.120
 proposed 2019 bond program and before David begins let me just sort of say I

00:28:02.120 --> 00:28:09.120
 think that this is a critical meeting for us tonight I think that that we want

00:28:09.120 --> 00:28:15.700
 to come out of this meeting with a sense of where our priorities are where we

00:28:15.700 --> 00:28:19.400
 believe that we want to make some assumptions on the growth rate and

00:28:19.400 --> 00:28:25.600
 therefore what the impact is on the tax rate so these this is this meeting is

00:28:25.600 --> 00:28:30.880
 one tonight in which we need as the committee to begin to take ownership of

00:28:30.880 --> 00:28:35.680
 this bond package we've had a lot of presentations from staff but over the

00:28:35.680 --> 00:28:41.400
 course of this evening it's it's in our hands and and we need to own this

00:28:41.400 --> 00:28:47.440
 package because ultimately when it comes time to go to the voters we're the ones

00:28:47.440 --> 00:28:52.160
 who are going to have to make the case for this bond package city staff can't

00:28:52.160 --> 00:28:57.160
 make the case and city the city council members cannot make the case it will be

00:28:57.160 --> 00:29:02.000
 this committee that will become a political action committee to work

00:29:02.000 --> 00:29:08.640
 toward the passage of this bond and in order to do that we have to own what

00:29:08.640 --> 00:29:12.600
 this bond is about and that's what tonight is is taking ownership of this

00:29:12.600 --> 00:29:18.080
 so with that I want to turn it over to David good evening committee David gains

00:29:18.080 --> 00:29:22.520
 director of finance for this item we're going we're going to take a step back

00:29:22.520 --> 00:29:26.520
 and look at the projects in total go through many of the financial

00:29:26.520 --> 00:29:29.760
 financial considerations that we've talked through up to this point and some

00:29:29.760 --> 00:29:34.000
 updated scenarios based on feedback from the committee and then after that we'll

00:29:34.000 --> 00:29:38.000
 get into some more detail on the street rehab program to answer a few questions

00:29:38.000 --> 00:29:42.200
 and on Ryan Road as well so that's the purpose of this presentation following

00:29:42.200 --> 00:29:45.360
 this perfect presentation the next item on the agenda is the prioritization

00:29:45.360 --> 00:29:48.920
 presentation which will go over the results of the most recent priority

00:29:48.920 --> 00:29:52.760
 prioritization survey obviously these will go these will really work hand in

00:29:52.760 --> 00:29:59.000
 hand with each other as you all start to make those make those decisions so to

00:29:59.000 --> 00:30:04.640
 set the stage here's our current project cost that we went over last last meeting

00:30:04.640 --> 00:30:08.600
 last week as we got those updates to the police renovation and police stuff

00:30:08.600 --> 00:30:13.280
 six substation projects so you can see the potential bond cost here in the

00:30:13.280 --> 00:30:17.480
 middle our total project costs that we've seen multiple times this total

00:30:17.480 --> 00:30:21.200
 project cost obviously including the other funding sources that come in for

00:30:21.200 --> 00:30:26.720
 those major roadway projects and then a funding option here I've highlighted a

00:30:26.720 --> 00:30:32.240
 few of these projects on the funding option column just because I think these

00:30:32.240 --> 00:30:35.160
 are some of those decision points for the committee to consider especially as

00:30:35.160 --> 00:30:40.280
 we get to that prioritization piece of today's conversation of what funding

00:30:40.280 --> 00:30:44.720
 level the committee wants on these projects Ryan Road is one have plugged

00:30:44.720 --> 00:30:47.920
 four million here obviously we have that four million to 19 million dollar range

00:30:47.920 --> 00:30:51.360
 at the end of this presentation we're gonna have a few slides that really get

00:30:51.360 --> 00:30:55.200
 into the detail of what that means so that you have concrete examples of what

00:30:55.200 --> 00:30:59.040
 is four million mean for that Ryan Road project from a city perspective what is

00:30:59.040 --> 00:31:05.680
 19 million mean from a city perspective so we want to go over some of the

00:31:05.680 --> 00:31:10.740
 financial assumptions that are built into all of our scenarios that we've

00:31:10.740 --> 00:31:14.200
 shown this shown this previously and just go through how we got to the

00:31:14.200 --> 00:31:21.080
 numbers of where we're at beginning with our debt issuance and next next year for

00:31:21.080 --> 00:31:26.880
 FY 1920 we are we do it have in our model to issue the final fourteen point

00:31:26.880 --> 00:31:31.160
 six million dollars of our 2014 bond program this will close that bond

00:31:31.160 --> 00:31:35.640
 program out have no nothing left to issue for the bond program but it is

00:31:35.640 --> 00:31:39.240
 included in all of our all of our models moving forward we also have five million

00:31:39.240 --> 00:31:43.680
 dollars in certificates of obligation for vehicle replacements and facility

00:31:43.680 --> 00:31:48.640
 improvements three moving forward in each of the years that's that's something

00:31:48.640 --> 00:31:53.040
 that we budgeted for multiple years now for annual improvements for our

00:31:53.040 --> 00:31:56.120
 facilities and for those replacements of vehicles and you can see the total

00:31:56.120 --> 00:32:00.200
 there with our vehicle replacements we typically do five-year debt and for

00:32:00.200 --> 00:32:05.360
 facility improvements we tenure down we are utilizing in the first few years of

00:32:05.360 --> 00:32:09.720
 the bond of our bond schedule to draw down a fund balance that is built up in

00:32:09.720 --> 00:32:13.480
 our debt service fund that fund balance really has just built up simply because

00:32:13.480 --> 00:32:18.440
 our assessed values have come in higher than the certified values over the past

00:32:18.440 --> 00:32:22.240
 few years it's built up a balance that's not necessary in our debt service fund

00:32:22.240 --> 00:32:26.360
 so we're able to then use that balance to pay off debt service in the next few

00:32:26.360 --> 00:32:29.820
 years which mitigates some of that increase that we would experience in

00:32:29.820 --> 00:32:35.920
 the tax rate with increased debt service payments for next year we currently have

00:32:35.920 --> 00:32:41.560
 a seven point three percent increase in our non frozen assessed values and we'll

00:32:41.560 --> 00:32:45.000
 talk about a little bit on the next slide but that's up through our last

00:32:45.000 --> 00:32:50.360
 preliminary values from the appraisal district we got those last Friday that'll

00:32:50.360 --> 00:32:53.640
 be those are the last values we get up until next Thursday or Friday when we get

00:32:53.640 --> 00:32:57.200
 our certified values and then we can really put some concrete numbers to what

00:32:57.200 --> 00:33:01.320
 we're expecting next year this is our estimate based on the preliminary values

00:33:01.320 --> 00:33:05.560
 we've received so far I will say the appraisal district has experienced

00:33:05.560 --> 00:33:09.200
 greater number of protests than they've ever experienced so that number has

00:33:09.200 --> 00:33:13.560
 fluctuate quite fluctuated quite a bit we've built in some room in this

00:33:13.560 --> 00:33:17.080
 estimate to anticipate that dropping further next year so we feel comfortable

00:33:17.080 --> 00:33:21.360
 right now at the seven point three percent number in non frozen values on

00:33:21.360 --> 00:33:27.200
 assessed value assessed value increase we'll talk about this on the next slide

00:33:27.200 --> 00:33:30.680
 as well but our assumptions that you'll see moving forward have a five percent

00:33:30.680 --> 00:33:37.800
 growth estimate for assessed value in future years past 19 FY 19 20 and then

00:33:37.800 --> 00:33:41.840
 for our interest rate we're currently assuming next year to have an interest

00:33:41.840 --> 00:33:45.880
 rate of three point seven five percent which is still above we just issued debt

00:33:45.880 --> 00:33:49.440
 this last week at three point seven five percent is above what we just issued

00:33:49.440 --> 00:33:53.760
 because rates are as low as they've been in a long time right now but to be

00:33:53.760 --> 00:33:58.520
 conservative we've kind of anticipated that to inch its way back up and then

00:33:58.520 --> 00:34:02.000
 have four and a half percent as an interest rate in those out years past

00:34:02.000 --> 00:34:20.200
 2020 and that's been an emphasis to it for the city especially over the past

00:34:20.200 --> 00:34:23.440
 year we've really stepped back and take taking a look a hard look at all of our

00:34:23.440 --> 00:34:27.240
 vehicles at our replacement policies we've been able to take some vehicles

00:34:27.240 --> 00:34:31.520
 that were utilized in multiple departments but not utilized very often

00:34:31.520 --> 00:34:34.640
 their utilization wasn't very high combine those and have some sharing

00:34:34.640 --> 00:34:38.640
 across the city so we've been able to reduce that continually to reduce that

00:34:38.640 --> 00:34:42.360
 this fiscal year and next fiscal year so it's possible that three don't need that

00:34:42.360 --> 00:34:45.880
 three and a half every year that may be a conservative number but that's what we

00:34:45.880 --> 00:34:53.800
 have built into the scenarios so obviously the assessed value is one of

00:34:53.800 --> 00:34:57.880
 the the most important of the assumptions that we have whatever number

00:34:57.880 --> 00:35:01.720
 we whatever percentage we pick for assessed value has a direct impact on

00:35:01.720 --> 00:35:05.920
 what that tax rate is needed that the tax rate increase that would be needed

00:35:05.920 --> 00:35:10.240
 on the debt service side to pay for our increased debt service payments so you

00:35:10.240 --> 00:35:15.680
 can see the history of our tax rate since 2014 we have been

00:35:15.680 --> 00:35:21.000
 experienced and really since 2011 2012 we started the growth but since 2014

00:35:21.000 --> 00:35:25.360
 significant growth that our assessed value that's not surprising to anyone and

00:35:25.360 --> 00:35:31.320
 here as you've seen your property values grow and the growth within the city up

00:35:31.320 --> 00:35:36.240
 through for comparison stakes in 2018 and 2019 we've shown our total assessed

00:35:36.240 --> 00:35:40.520
 value the growth of our total assessed value but we've also starting in 2018 had

00:35:40.520 --> 00:35:46.600
 the first impact of our over 65 tax freeze so for comparison sake showed the

00:35:46.600 --> 00:35:50.640
 total but really what what is important right now for our considerations and

00:35:50.640 --> 00:35:55.360
 what the new revenue that's coming into us is a seven point three percent of growth

00:35:55.360 --> 00:36:00.040
 in our non frozen values and David I think this might be a good point for the

00:36:00.040 --> 00:36:08.320
 committee to have some discussion about the assessed value growth that that the

00:36:08.320 --> 00:36:13.760
 task force is recommending but is also in the hands of this committee to decide

00:36:13.760 --> 00:36:19.720
 what do we want what do we want to assume in terms of property growth for

00:36:19.720 --> 00:36:28.480
 the coming years the committee looked at a number of different scenarios when

00:36:28.480 --> 00:36:31.440
 you when you see the growth that's occurring around here there was this

00:36:31.440 --> 00:36:37.520
 question of what's the right number there was some concern within the within

00:36:37.520 --> 00:36:43.560
 the task force that that it's been a while since we've had a recession and

00:36:43.560 --> 00:36:50.840
 what happens if we have a recession and we can look back in an 08 no 9 and 10

00:36:50.840 --> 00:36:57.080
 and we can see the recession numbers that impacted our property values at

00:36:57.080 --> 00:37:03.120
 that point in time so that was one consideration the fact that the we have

00:37:03.120 --> 00:37:08.680
 this much lower increase because of the non frozen values became another

00:37:08.680 --> 00:37:15.400
 consideration and so the the that the task force in looking at that felt that

00:37:15.400 --> 00:37:23.680
 four percent was too low and we looked at six but settled on five and I think

00:37:23.680 --> 00:37:29.760
 that the question that is really before the the bond committee at this point is

00:37:29.760 --> 00:37:34.120
 what are we comfortable with are we comfortable with that five percent

00:37:34.120 --> 00:37:37.320
 assumption do we want to be more aggressive or do we want to be more

00:37:37.320 --> 00:37:42.400
 conservative and so with that I would just sort of turn it over for your

00:37:42.400 --> 00:37:47.120
 comments and and thoughts on this this is one of those pieces we need to own

00:37:47.120 --> 00:37:54.160
 because this will also impact what the what the tax rate increase might be

00:37:54.160 --> 00:38:04.840
 David I know there's been some some bills passed recently state statewide or

00:38:04.840 --> 00:38:10.640
 state level that have affected cities in multiple ways one being taxes I wonder I

00:38:10.640 --> 00:38:15.560
 guess my question is that what is you know does any of that affect some of

00:38:15.560 --> 00:38:19.080
 these values that affect us locally or should we take that into consideration

00:38:19.080 --> 00:38:23.240
 sure it does as far as for the conversation just on the AV goes there's

00:38:23.240 --> 00:38:27.800
 nothing that will affect affect the I think later on and I'll just I'll come

00:38:27.800 --> 00:38:31.160
 back to this slide but just kind of give you a preview of some of the numbers

00:38:31.160 --> 00:38:34.800
 there's a lot of numbers here but one of the pieces I will talk about is the

00:38:34.800 --> 00:38:38.040
 the largest impact to cities right now as far as tax rate is a three and a half

00:38:38.040 --> 00:38:43.320
 percent rollback rate that rollback rate really is focused specifically on for

00:38:43.320 --> 00:38:47.120
 the most part the M&O the operations and maintenance rate so what we do on the

00:38:47.120 --> 00:38:50.520
 debt service side doesn't have a direct is not directly impacted by the three

00:38:50.520 --> 00:38:54.120
 and a half percent rollback so I'll talk about that a little bit later but that

00:38:54.120 --> 00:38:59.280
 that's the biggest impact and it doesn't have a big consideration for what you do

00:38:59.280 --> 00:39:04.320
 with the debt service tax rate thank you not to give you get you off track but

00:39:04.320 --> 00:39:08.400
 I've been requesting some information for the last month a month and a half do

00:39:08.400 --> 00:39:18.720
 we get it today time I got it we will get to that on slide 25 but we have can

00:39:18.720 --> 00:39:24.440
 it can I suggest that we come to that a little bit later let's focus on our

00:39:24.440 --> 00:39:29.080
 assessed value question and and what the assumption is that we want to make as a

00:39:29.080 --> 00:39:36.920
 committee on on the assessed value growth so as more and more of our citizens

00:39:36.920 --> 00:39:44.680
 become over 65 and properties continue to freeze we know we see the spread

00:39:44.680 --> 00:39:50.520
 between seven point three and eight point oh what happens have we thought

00:39:50.520 --> 00:39:56.160
 about that you know consideration it's definitely something it's still someone

00:39:56.160 --> 00:39:59.680
 new for us to try to try to plan for that I think when we first were

00:39:59.680 --> 00:40:02.160
 considering the freeze if you go back and look at some of our projections

00:40:02.160 --> 00:40:06.760
 previously we're expecting more of a gradual hit from the freeze but we

00:40:06.760 --> 00:40:10.720
 really kind of had that up front and now we've seen some gradual growth and what

00:40:10.720 --> 00:40:14.240
 the frozen amounts are as far as more people getting on to the freeze so I

00:40:14.240 --> 00:40:18.240
 think as we continue to see that if that trend plays out it'll allow us to eat

00:40:18.240 --> 00:40:23.680
 more easily project that in the future I think in future years is the gap between

00:40:23.680 --> 00:40:28.200
 those won't be as high because we're still having people add to the freeze

00:40:28.200 --> 00:40:32.360
 right now which I think it makes that gap a little bit wider than it would be I

00:40:32.360 --> 00:40:36.440
 think normally if we were looking at just non frozen versus non frozen and

00:40:36.440 --> 00:40:39.840
 frozen versus frozen it should be about the same so I think it's just I think

00:40:39.840 --> 00:40:42.920
 the majority of that is just because we're still at the beginning of the

00:40:42.920 --> 00:40:50.440
 process okay I trust you okay go ahead Patty then

00:40:50.440 --> 00:40:57.000
 Randy we talk about growth but I think within that growth we need to look at

00:40:57.000 --> 00:41:01.040
 what kind of growth this is what percentage of it is commercial do we

00:41:01.040 --> 00:41:05.360
 project will be business growth commercial industrial which has a very

00:41:05.360 --> 00:41:10.360
 low cost of service compared to residential and especially multifamily so

00:41:10.360 --> 00:41:18.120
 how has that factored into these projections have we considered that at

00:41:18.120 --> 00:41:23.440
 all have we considered cost of service there the our projections have just been

00:41:23.440 --> 00:41:28.560
 at a high level of here's the total AV as it grows as it's growing so we

00:41:28.560 --> 00:41:31.560
 haven't got to the level of commercials growing in X amount residential is

00:41:31.560 --> 00:41:35.040
 growing in X amount because traditionally as we dig into those

00:41:35.040 --> 00:41:39.280
 numbers it all kind of comes back to the high level three four or five percent on

00:41:39.280 --> 00:41:44.600
 the growth it's also difficult to to get to that level and have have validity in

00:41:44.600 --> 00:41:48.200
 those numbers as we get down to that point the cost of service question is

00:41:48.200 --> 00:41:52.480
 one that that we always that we have frequently and it's one that right now

00:41:52.480 --> 00:41:56.180
 we're you know engaging with different consultants to try to understand what is

00:41:56.180 --> 00:41:59.400
 that kind of break-even point but it's a little bit different than this

00:41:59.400 --> 00:42:03.240
 conversation but it is a valid point

00:42:04.600 --> 00:42:15.680
 Randy yeah just question about the so 2019 let's use 8.07 just for comparisons

00:42:15.680 --> 00:42:20.640
 but that's eight billion dollars an increase in property base is that

00:42:20.640 --> 00:42:33.800
 correct eight million you sorry yeah yeah that's the eight yeah eight this is

00:42:33.800 --> 00:42:38.300
 the total amount of the increase that's correct you're right that's a total eight

00:42:38.300 --> 00:42:43.800
 yes that's not a million dollar increase eight billion dollar increase

00:42:43.800 --> 00:42:59.120
 should be about eight hundred eight hundred million dollars I know our total

00:42:59.120 --> 00:43:08.560
 is around 11 to 13 billion so eight hundred million dollar increase so the

00:43:08.560 --> 00:43:15.320
 eight hundred million dollars and I know we've asked we talked about this and the

00:43:15.320 --> 00:43:22.760
 task force deal I just wanted for the committee to hear it but that how much

00:43:22.760 --> 00:43:29.800
 of that growth is new properties that have come on the tax rolls versus an

00:43:29.800 --> 00:43:33.400
 increase in existing properties so this year it's about four hundred and fifteen

00:43:33.400 --> 00:43:43.400
 million of that is new growth of the eight hundred million so about half of

00:43:43.400 --> 00:43:47.900
 strictly the increase yes okay so if we're talking about a five percent

00:43:47.900 --> 00:43:56.540
 increase and I know everybody is seeing all the projections on development the

00:43:56.540 --> 00:44:06.200
 on the around the loop and on the south southwest part of town is that we have

00:44:06.200 --> 00:44:14.120
 any idea what what that would mean to that that increase number we haven't

00:44:14.120 --> 00:44:17.680
 right now in our model essentially we're saying four percent growth and new

00:44:17.680 --> 00:44:24.120
 value and regular and existing value we right now don't have number a different

00:44:24.120 --> 00:44:26.560
 percentage for new growth in those different areas that's definitely

00:44:26.560 --> 00:44:31.200
 something we could look at though okay yeah I just I just want to clarify that

00:44:31.200 --> 00:44:36.720
 you know if there is if there are new properties coming on to the the tax

00:44:36.720 --> 00:44:42.480
 rolls and if it becomes more than the more than 50% of the annual project or

00:44:42.480 --> 00:44:50.600
 the projected increase I think that gives pretty good credence to five percent

00:44:50.600 --> 00:44:59.000
 versus four I'm with I don't think we should get as high as six that's too

00:44:59.000 --> 00:45:04.720
 close to seven point three in my opinion but you know my mind started at four

00:45:04.720 --> 00:45:11.600
 percent in the very beginning so I'm that makes me feel more comfortable with

00:45:11.600 --> 00:45:17.040
 five if we think there's a lot more development and properties that can be

00:45:17.040 --> 00:45:21.520
 added to the tax rolls in the next five years which all indications are it's

00:45:21.520 --> 00:45:30.200
 gonna it is gonna happen that I'm okay with five percent that's just other

00:45:30.200 --> 00:45:33.600
 questions or comments

00:45:39.400 --> 00:45:50.000
 the end of next week day after our next meeting right possibly the day Anna my

00:45:50.000 --> 00:45:57.000
 law firm could run its entire practice on protest for taxes this year just very

00:45:57.000 --> 00:46:02.740
 quick question if we're going to be honest with our citizens about raising

00:46:02.740 --> 00:46:10.880
 taxes what does the five percent mean to them well what let's let's it's about

00:46:10.880 --> 00:46:20.480
 25 about $25 a cent so thank you but I think there's as we'll go through the

00:46:20.480 --> 00:46:23.440
 process is important caveats to them when we say five cents we're not saying

00:46:23.440 --> 00:46:27.680
 five cents every year we say go up to a five cent tax it's in one year if these

00:46:27.680 --> 00:46:36.280
 assumptions fill okay comment I just want to make sure I fully understand this so

00:46:36.280 --> 00:46:41.120
 my understanding is that the growth rate assumption that we assume will then

00:46:41.120 --> 00:46:49.880
 determine how many cents on the tax rate we tell people that this could cause and

00:46:49.880 --> 00:46:55.520
 then it is the city's intention although they are not legally bound to ensure

00:46:55.520 --> 00:47:01.040
 that the debt service rate does not rise above that increase over the period of

00:47:01.040 --> 00:47:06.760
 the bond program is that a reasonable summary yes okay thank you okay Queen

00:47:06.760 --> 00:47:11.400
 did you have something oh no I think somebody said $25 where did I get that

00:47:11.400 --> 00:47:17.760
 from there's something about something you were saying and then for just yeah

00:47:17.760 --> 00:47:22.280
 on average on for our average taxable value on a home it's about $25 per

00:47:22.280 --> 00:47:30.360
 percent that increases okay the questions and comments on the assumptions

00:47:30.360 --> 00:47:32.760
 for the growth rate

00:47:32.760 --> 00:47:50.480
 yeah so would it be but I'll try again please feel free to jump in so sure

00:47:52.280 --> 00:47:59.880
 the July 11 2019 on program financial presentation page five I think that

00:47:59.880 --> 00:48:06.620
 might give a little bit more context so Eric while you're at while you're

00:48:06.620 --> 00:48:11.000
 restating out of a thank you I will run the risk of not looking at paper while

00:48:11.000 --> 00:48:20.400
 I speak so so my understanding is that the growth rate that we assume and also

00:48:20.400 --> 00:48:28.600
 the size of the capital package we asked for determine the projections of the

00:48:28.600 --> 00:48:35.000
 number of cents the tax rate the debt service tax rate may have to increase in

00:48:35.000 --> 00:48:41.840
 order to fund the the bonds right and then it is the city's intention that if

00:48:41.840 --> 00:48:47.720
 you can you go back to the chart with the sorry when it shows the the debt

00:48:47.720 --> 00:48:53.200
 service and or maybe we haven't gotten there yet yeah just that shows the the

00:48:53.200 --> 00:49:01.280
 combination of the debt service and the M&O rate the table sorry yeah yeah so so

00:49:01.280 --> 00:49:05.080
 then it is the city's intention that the second column there the debt service

00:49:05.080 --> 00:49:12.240
 rate would be held to whatever number of cents that is above the current rate of

00:49:12.240 --> 00:49:19.440
 21.5 cents throughout the the term of the bond program and so if economic

00:49:19.440 --> 00:49:24.600
 things change then they would change the issuance of the bonds the schedule or

00:49:24.600 --> 00:49:29.120
 something like that in order to not exceed the number of cents that we told

00:49:29.120 --> 00:49:34.000
 the voters that they might incur yeah isn't that when you when you put it

00:49:34.000 --> 00:49:39.120
 before whoever you buy the bonds from this is what your guarantee is for X

00:49:39.120 --> 00:49:45.840
 number of years of the bond unless it goes down that's a it's a little bit of

00:49:45.840 --> 00:49:49.440
 a different question the target when we're talking about the debt service

00:49:49.440 --> 00:49:52.920
 tax rate increase as Eric was saying that's really a number that we say

00:49:52.920 --> 00:49:57.680
 here's what we anticipate the impact on the debt service tax rate which all the

00:49:57.680 --> 00:50:01.240
 debt service tax rate does is pay our debt service payments so I mean it's

00:50:01.240 --> 00:50:04.320
 involved with that our debt service payments will go up as we issue more

00:50:04.320 --> 00:50:09.840
 bonds we anticipate that on this scenario it won't go up over five cents

00:50:09.840 --> 00:50:14.920
 but as Eric mentioned that's not you know in official language if we there was a

00:50:14.920 --> 00:50:18.200
 point and we had to make considerations we would obviously work through the

00:50:18.200 --> 00:50:21.880
 oversight bond oversight committee and City Council but the intention would be

00:50:21.880 --> 00:50:26.960
 to not cat go over that five cent debt service tax rate that was that was

00:50:26.960 --> 00:50:40.680
 published with with the bond program and the point is if we if we assumed a 7%

00:50:40.680 --> 00:50:45.600
 rate every year then we could say oh it's not gonna go up any more than three

00:50:45.600 --> 00:50:52.320
 cents in the next five years but I think it's it's much better to have a have a

00:50:52.320 --> 00:51:03.360
 somewhat conservative growth estimate and so that we know that this this five

00:51:03.360 --> 00:51:10.280
 cents is gonna be the maximum because we did keep our growth estimate at 5% which

00:51:10.280 --> 00:51:16.600
 hopefully is a conservative number are there are there any other questions or

00:51:16.600 --> 00:51:22.200
 comments if if not I would entertain a motion about what we will use as our

00:51:22.200 --> 00:51:33.680
 assumed property value growth rate assessed value property growth rate I'll

00:51:33.680 --> 00:51:44.080
 make a motion that we assume 5% a B growth is there got a second

00:51:48.280 --> 00:51:55.720
 anyone want to make a speech for or against that seeing none all the way I'm

00:51:55.720 --> 00:52:00.320
 sorry so we can't hold it at four no it's not good it's not doable I'm trying

00:52:00.320 --> 00:52:11.440
 to understand okay maybe I'll just try to add a little bit to what I was

00:52:11.440 --> 00:52:20.200
 explaining before I'm sure I get to the 200% mark the risk that I see if we

00:52:20.200 --> 00:52:26.560
 assume a higher AV growth than materializes is that or an aggressive

00:52:26.560 --> 00:52:31.480
 goal in other words would be that it's more likely that the city would either

00:52:31.480 --> 00:52:39.640
 have to change how quickly those bonds are issued to stay under the the

00:52:39.640 --> 00:52:45.640
 projection of how many cents it rises or that the city would have to renege on

00:52:45.640 --> 00:52:51.520
 that projection and raise it above that amount of sense is that accurate I say

00:52:51.520 --> 00:52:54.560
 the third option would be to not do a project I mean obviously the leader

00:52:54.560 --> 00:52:58.600
 laying the project or not doing okay but most likely would just be delaying the

00:52:58.600 --> 00:53:06.920
 project and fitting it into our issue and schedule if we delay a project that

00:53:06.920 --> 00:53:14.600
 gives more opportunity for inflation and and cost overruns when we finally are

00:53:14.600 --> 00:53:19.400
 able to do that correct which is why the goal is to set a rate set a tax rate

00:53:19.400 --> 00:53:23.920
 increase that we feel comfortable with that we don't end up in that situation I

00:53:23.920 --> 00:53:29.000
 think you know we have this slide later where we talked through this was a

00:53:29.000 --> 00:53:34.580
 question that was brought up last time of our last three bond programs did we go

00:53:34.580 --> 00:53:39.480
 over that max rate and we did not we've stayed significantly under that rate so

00:53:39.480 --> 00:53:44.040
 in 2005 bond program we said we were gonna have up to a four cent tax rate

00:53:44.040 --> 00:53:47.560
 increase so I'll just kind of describe what these lines are here this black and

00:53:47.560 --> 00:53:53.400
 black and blue line is our debt service tax rate since 20 2005 and the dotted

00:53:53.400 --> 00:53:58.280
 blue line above it is our max tax rate so as we go forward if we say you want a

00:53:58.280 --> 00:54:01.720
 four we go with a program that's a four or five cent that then becomes our max

00:54:01.720 --> 00:54:06.540
 starting next year so you can see throughout the 2005 bond program we

00:54:06.540 --> 00:54:12.360
 stayed well under our are the max four cents that we could have issued through

00:54:12.360 --> 00:54:16.480
 that program in 2012 the only reason it comes down here is because in 2012 we

00:54:16.480 --> 00:54:20.560
 went into a program that had had no anticipated no tax rate increase so

00:54:20.560 --> 00:54:24.560
 those just essentially stayed the same in 2014 we said we would have a four

00:54:24.560 --> 00:54:28.160
 cent tax rate increase and we're at a point now where we haven't used that

00:54:28.160 --> 00:54:32.540
 force those four cents because assessed values came in higher than we projected

00:54:32.540 --> 00:54:36.240
 so if we say we want five percent and that's equated to a four or five cent

00:54:36.240 --> 00:54:40.600
 tax increase but we get we get rates like we just saw worth eight percent to

00:54:40.600 --> 00:54:45.080
 ten percent over the six years of this program we're gonna stay you know well

00:54:45.080 --> 00:54:50.360
 below or not even increase the debt service tax rate to get there what rate

00:54:50.360 --> 00:55:02.480
 did we assume growth during five twelve and fourteen percent four percent so and

00:55:02.480 --> 00:55:06.640
 I'm running numbers because I'm trying to think of having the commercial

00:55:06.640 --> 00:55:10.640
 businesses residential and all these tax increases so I'm trying to get the

00:55:10.640 --> 00:55:26.720
 numbers right I'm sorry guys but I do think it's good on four I do come I see

00:55:26.720 --> 00:55:31.280
 where it is on five as well I don't know I'm just gonna get these numbers right

00:55:31.280 --> 00:55:34.480
 so you want to go to a different side were you looking at could you please I

00:55:34.480 --> 00:55:38.960
 think the one thing I would want to add at four we will have to assume a greater

00:55:38.960 --> 00:55:42.760
 tax rate increase and that's what we would have to take to the voters and

00:55:42.760 --> 00:55:48.160
 with the voters authorize a bigger tax rate increase and at five we kind of

00:55:48.160 --> 00:55:53.200
 split the difference potential potential right but we have to tell them what it

00:55:53.200 --> 00:55:55.960
 potentially could be

00:56:00.520 --> 00:56:09.680
 we have to really guess based on this alive Mike yeah based on past experience

00:56:09.680 --> 00:56:16.000
 and whatever brains in education we can bring to it because the AV is essentially

00:56:16.000 --> 00:56:36.800
 set by the county it's not but it's not a city unit the city is not setting its

00:56:36.800 --> 00:56:43.000
 own valuations so really what we have to do here is base a lot of our decisions

00:56:43.000 --> 00:56:59.160
 on a guess so how comfortable does the city and the staff fill with the five

00:56:59.160 --> 00:57:05.640
 percent right because we were initially given a four percent right we've used

00:57:05.640 --> 00:57:13.120
 four percent of the past can we get your kind of feel I ultimately we felt we're

00:57:13.120 --> 00:57:16.480
 comfortable with the five percent I think if if we weren't comfortable that

00:57:16.480 --> 00:57:20.600
 we would definitely give us raise alarms and I think I mean I think if we started

00:57:20.600 --> 00:57:24.960
 talking about six or seven percent we definitely want to have a detailed

00:57:24.960 --> 00:57:28.240
 discussion on that but five percent is something and it comes back to the new

00:57:28.240 --> 00:57:34.600
 growth and in the trends that we're seeing so we do have a motion and a

00:57:34.600 --> 00:57:39.720
 second on the floor is there any other discussion seeing none all in favor of

00:57:39.720 --> 00:57:44.640
 supporting the motion for a five percent assumption on the assessed value growth

00:57:44.640 --> 00:57:52.320
 please say aye do you need a you need a you need a handbook okay all right raise

00:57:52.320 --> 00:58:05.000
 your right hand or your left hand I don't care great all right so as we move

00:58:05.000 --> 00:58:09.440
 forward now we'll work from the assumption of a five percent growth rate

00:58:09.440 --> 00:58:15.480
 and what the impact would be with the various aspects of this and and David

00:58:15.480 --> 00:58:19.600
 one of the things that I think that you indicated to me earlier today was that

00:58:19.600 --> 00:58:25.240
 that you all have kind of rerun some numbers in terms of what five percent

00:58:25.240 --> 00:58:29.560
 might mean at different levels and I think that's what this slide is about it

00:58:29.560 --> 00:58:32.720
 is so this kind of leads into the forecast assumptions you know the other

00:58:32.720 --> 00:58:37.440
 the other variable that that plays a part in the total tax rate and the whole

00:58:37.440 --> 00:58:41.080
 plan itself is when do we issue the debt when do when do we need these when do

00:58:41.080 --> 00:58:44.320
 we get dollars for the program so we step back with our financial advisors

00:58:44.320 --> 00:58:48.480
 and looked at what how can we time the issue it says so we can get the projects

00:58:48.480 --> 00:58:53.640
 done but also at a issuance rate that has the least impacts on the tax rate

00:58:53.640 --> 00:58:57.320
 so that's what we're that's what we're presenting here you know obviously as we

00:58:57.320 --> 00:59:00.400
 look forward on this program we're gonna have a lot of cost in those first couple

00:59:00.400 --> 00:59:03.600
 years as you've seen the schedule for the police station the police for

00:59:03.600 --> 00:59:07.640
 innovation and a couple of those major projects so there is a big impact in

00:59:07.640 --> 00:59:11.360
 those first few years to our debt service that is where we're also helped

00:59:11.360 --> 00:59:14.240
 by that having that debt service fund balance that we're able to utilize in

00:59:14.240 --> 00:59:18.360
 those first few years to mitigate that impact from the debt service on the debt

00:59:18.360 --> 00:59:21.800
 service tax rate from what we have to pay with debt service so all those are

00:59:21.800 --> 00:59:26.360
 the factors that really play into it but we will by doing that and by taking that

00:59:26.360 --> 00:59:32.160
 look we're able to come here and say we have a five cent increase right under a

00:59:32.160 --> 00:59:36.520
 five cent increase on the two hundred thirty five million dollar project we

00:59:36.520 --> 00:59:42.280
 this was discussed if you would would you update the committee on the action

00:59:42.280 --> 00:59:49.240
 that the council took so obviously following last Thursday meeting last

00:59:49.240 --> 00:59:53.000
 Thursday's committee meeting one of the action items was to go to the City

00:59:53.000 --> 00:59:57.000
 Council and request that would they revise the resolution that that formed

00:59:57.000 --> 01:00:01.360
 the committee which had a not to exceed amount of 210 million dollars that

01:00:01.360 --> 01:00:05.880
 amount has now been increased to 235 million dollars there was some

01:00:05.880 --> 01:00:10.320
 discussion during the work session we presented the item to City Council a lot

01:00:10.320 --> 01:00:13.920
 of positive conversation from that from that meeting and they ultimately

01:00:13.920 --> 01:00:17.920
 approved it on their agenda and I think the the intent from them to approve it

01:00:17.920 --> 01:00:21.480
 was to just give the committee all the capacity they needed to have a full

01:00:21.480 --> 01:00:29.280
 discussion of the projects as presented all right thank you any other questions

01:00:29.280 --> 01:00:43.320
 in terms of this particular slide yes I was yeah I was agreeing with you were

01:00:43.320 --> 01:00:48.080
 saying we were at four point four four percent and then if that change had

01:00:48.080 --> 01:00:54.080
 happened today so I was just concerned you know hope you don't mind that yeah I

01:00:54.080 --> 01:00:59.400
 was just really concerned because we did say four percent sounds like oh my

01:00:59.400 --> 01:01:04.480
 goodness when we changed to five percent it rattled me a little bit because I was

01:01:04.480 --> 01:01:12.960
 really stuck on that does that make sense I don't know okay all right let's

01:01:12.960 --> 01:01:19.040
 move on to the next slide so this is a slide that was developed early from

01:01:19.040 --> 01:01:22.960
 conversations with the committee of different pieces that everyone wanted to

01:01:22.960 --> 01:01:27.040
 see with each of the scenarios so I'm gonna go through I'll go through fairly

01:01:27.040 --> 01:01:30.280
 quickly because there's a lot of numbers here and I'll hit on some of the the

01:01:30.280 --> 01:01:33.440
 numbers that I think we're of most interest but definitely can answer any

01:01:33.440 --> 01:01:39.960
 questions as we go through but for the 235 million dollar program we anticipate

01:01:39.960 --> 01:01:44.680
 a five cent increase in the debt service tax rate and you can see that on the

01:01:44.680 --> 01:01:48.880
 debt service tax rate here the second column that's bolded of how it how it

01:01:48.880 --> 01:01:53.480
 increases through the years where we really gradually come up to our largest

01:01:53.480 --> 01:01:59.280
 increases in FY 23 and 24 and through 26 and then it'll start going down after

01:01:59.280 --> 01:02:03.800
 that we also show our total tax rate which is a combination of our

01:02:03.800 --> 01:02:07.000
 maintenance and operations rate with our debt service tax rate and this is our

01:02:07.000 --> 01:02:11.040
 maintenance operations rate at the effective level for the entirety of the

01:02:11.040 --> 01:02:15.760
 program and then have shown here the three and a half percent rollback rate

01:02:15.760 --> 01:02:21.000
 and this again doesn't have a lot is not impacted very much by this bond program

01:02:21.000 --> 01:02:24.520
 itself other than some maintenance costs associated with any of the projects as

01:02:24.520 --> 01:02:28.600
 they move forward but wanted to show this here for context but three and a

01:02:28.600 --> 01:02:32.200
 half percent rollback rate is a new is new in the legislation that was just

01:02:32.200 --> 01:02:36.280
 passed by the Texas Legislature this year it'll go into effect next fiscal

01:02:36.280 --> 01:02:42.640
 year for us in our budget considerations for FY 2021 and what it says is we can't

01:02:42.640 --> 01:02:48.680
 go over three and a half percent of our maintenance and operations rate that's

01:02:48.680 --> 01:02:53.480
 actually that's paid by existing values so of the values that have assessed

01:02:53.480 --> 01:02:59.160
 value right now if they're if their assessed values increase what is the tax

01:02:59.160 --> 01:03:03.960
 rate next year that would be that would be needed to pay the same amount of taxes

01:03:03.960 --> 01:03:07.720
 they're paying yes this year and that's how that's that's based on three and a

01:03:07.720 --> 01:03:11.320
 percent over that I know that can be a little bit complicated so I can

01:03:11.320 --> 01:03:15.200
 definitely answer any more questions on that piece but I think it doesn't have a

01:03:15.200 --> 01:03:19.040
 direct impact on us here but it is an important consideration for us as a city

01:03:19.040 --> 01:03:23.240
 as we move forward over the next year six years of this program and after that

01:03:23.240 --> 01:03:27.960
 of how we pay for our ongoing operations and maintenance costs that are increasing

01:03:27.960 --> 01:03:41.240
 but also deal with the three and a half percent rollback rate yeah I did not the

01:03:41.240 --> 01:03:45.680
 currently it's eight percent or currently the the eight percent is the

01:03:45.680 --> 01:03:49.280
 rollback rate and the Texas the legislature has now moved that back to

01:03:49.280 --> 01:03:52.880
 three and a half percent and it's based just on the maintenance and operations

01:03:52.880 --> 01:03:58.200
 rate it's what existing homes the value that would be amount of property taxes

01:03:58.200 --> 01:04:02.160
 we get for maintenance and operations from existing homes this year what

01:04:02.160 --> 01:04:07.520
 would the rate be next year to get that same value and that becomes essentially

01:04:07.520 --> 01:04:11.520
 an effective tax rate and then we can't go three and a half percent over that

01:04:11.520 --> 01:04:20.440
 that rate without going to the voters to get approval for that new rate this is

01:04:20.440 --> 01:04:24.600
 essentially saying in this year based on projections we have now we could only

01:04:24.600 --> 01:04:31.240
 increase the maintenance in operations rate 1.3 cents before we'd have to go we

01:04:31.240 --> 01:04:35.040
 be over that three now I these are based on a lot of projections the first year

01:04:35.040 --> 01:04:37.960
 we're doing this so that I think that number is probably between one and two

01:04:37.960 --> 01:04:44.480
 cents in some range but it's there for consideration all right you want to look

01:04:44.480 --> 01:04:50.440
 at the next scenario we had another question and it may be one you can't

01:04:50.440 --> 01:04:55.080
 answer because it's a future question does the city anticipate having any more

01:04:55.080 --> 01:05:01.320
 bonds going forward in the next few years so I think that comes back to the

01:05:01.320 --> 01:05:07.120
 assumptions question if we're a five percent assessed value growth and we say

01:05:07.120 --> 01:05:11.360
 we get five percent every year of this program I don't think it would be

01:05:11.360 --> 01:05:16.680
 difficult to go back out and ask the voters to do another increase but if we

01:05:16.680 --> 01:05:19.760
 have a percent and ten percent and there's there's room there within the

01:05:19.760 --> 01:05:22.520
 debt service tax rate I think that's when the considerations would happen I

01:05:22.520 --> 01:05:26.120
 think it's also a very safe assumption if we're gonna grow the way we're

01:05:26.120 --> 01:05:30.560
 growing we're gonna have more bond packages in the future

01:05:31.320 --> 01:05:40.160
 so David I have a question for clarification it sounded like in your

01:05:40.160 --> 01:05:44.480
 procedural description of the three and a half rollback rate that that only

01:05:44.480 --> 01:05:48.520
 applies to the M in a row rate the way I see this table the three and a half

01:05:48.520 --> 01:05:55.480
 rollback difference really looks like the difference between the your total

01:05:55.480 --> 01:06:01.160
 tax rate that we're planning on and the three and a half percent rollback rate

01:06:01.160 --> 01:06:05.280
 that's computed over the entire yes is that correct you're right I was trying

01:06:05.280 --> 01:06:09.520
 not to confuse everyone no it's okay I just I just want to clarify so really

01:06:09.520 --> 01:06:14.120
 what that means is that this is sort of a benchmark target that we're trying to

01:06:14.120 --> 01:06:18.440
 hit to stay below that three and a half percent rollback rate for the entire tax

01:06:18.440 --> 01:06:26.480
 rate however legally what is required by the recent legislation is that the city

01:06:26.480 --> 01:06:33.640
 must go to the voters if just the first column of the M&O rate right so when you

01:06:33.640 --> 01:06:38.160
 collect the roll when you when you calculate the rollback rate you take the

01:06:38.160 --> 01:06:41.560
 maintenance and operate the effective maintenance operations rate you three

01:06:41.560 --> 01:06:44.560
 and a half percent above that right and then you add in what your debt service

01:06:44.560 --> 01:06:49.320
 tax rate is so the actual rollback rate is the total it's just only impacted by

01:06:49.320 --> 01:06:52.480
 the maintenance and operations okay so I did not confuse so the number that's

01:06:52.480 --> 01:06:59.680
 presented is is the complete amount okay so is that column that says three and a

01:06:59.680 --> 01:07:02.400
 half rollback difference is that computed the way that you just described

01:07:02.400 --> 01:07:07.040
 correct okay thank you so I think we're going to go through a couple other

01:07:07.040 --> 01:07:14.280
 scenarios here this is that this is assuming this is at 235 million which is

01:07:14.280 --> 01:07:19.440
 the cap of what we could do and it would be a five cent tax rate increase if we

01:07:19.440 --> 01:07:24.360
 did a smaller package at 210 which was the original number I think that's our

01:07:24.360 --> 01:07:27.880
 next slide it is I do want to point out as we look at all these scenarios and

01:07:27.880 --> 01:07:31.920
 this was one of the emphasis is from City Council as we went into the program

01:07:31.920 --> 01:07:36.040
 was to not have a program that would exceed our total our current total tax

01:07:36.040 --> 01:07:39.600
 rate and obviously the 235 is going to be our largest program that we look at

01:07:39.600 --> 01:07:43.520
 and it it does not exceed the total tax rate that we current have currently have

01:07:43.520 --> 01:07:49.400
 and none of the scenarios moving forward do it either understanding those are

01:07:49.400 --> 01:07:53.400
 all with our operations maintenance rate at our effective tax rate which is a

01:07:53.400 --> 01:08:00.240
 different discussion with council each year on the operation side the 210

01:08:00.240 --> 01:08:04.080
 million dollar program which has been the somewhat of the benchmark as we that

01:08:04.080 --> 01:08:08.920
 we've looked at throughout this process you can see again the debt service tax

01:08:08.920 --> 01:08:13.520
 rate here all the other numbers as we talked about previously that service

01:08:13.520 --> 01:08:18.020
 tax rate going up a little bit under under four cents so we would say the

01:08:18.020 --> 01:08:22.680
 max tax rate that we could see in this program at 210 million dollars would be

01:08:22.680 --> 01:08:28.920
 a four cent tax rate increase but you can see the total tax rate here remaining

01:08:28.920 --> 01:08:33.400
 under our current tax rate throughout the life of the program and so four cents

01:08:33.400 --> 01:08:38.080
 would fall in line with what previous bond packages had as as the high high

01:08:38.080 --> 01:08:49.000
 total of potential taxing 2005 and 2012 and 2014 5 and 2014 4 in 2014 2005 and 2014

01:08:49.000 --> 01:09:02.280
 they Queen is just asking about we'll be addressing some of the some of the

01:09:02.280 --> 01:09:08.040
 specific projects later after we get to get through the some of these important

01:09:08.040 --> 01:09:17.080
 discussions so the next scenario to that the committee asked for last week was a

01:09:17.080 --> 01:09:20.880
 hundred eighty million dollar scenario and really these scenarios worked out

01:09:20.880 --> 01:09:26.000
 fairly cleanly where it kind of went a cent per scenario 180 million dollar

01:09:26.000 --> 01:09:30.640
 scenario was equated to a three percent increase at some point in the debt

01:09:30.640 --> 01:09:35.760
 service tax in in the six-year program and again it just to emphasize even when

01:09:35.760 --> 01:09:39.800
 we say six cents here you're not really experiencing that until 2023 2024 it's

01:09:39.800 --> 01:09:44.920
 not every year you're gonna be over that amount and so one of our selling points

01:09:44.920 --> 01:09:51.600
 here and what the council gave us was that there's there would be no impact on

01:09:51.600 --> 01:09:56.680
 the effective tax rate for homeowners on whatever scenario we work with is that

01:09:56.680 --> 01:10:04.200
 right on the 100 million dollar scenario the goal the goal was to keep the

01:10:04.200 --> 01:10:08.400
 effective rate where it is which is basically where we are in total when you

01:10:08.400 --> 01:10:11.080
 look at the kind of the way that the hundred million dollar scenario works

01:10:11.080 --> 01:10:17.440
 out on the because the effective rate on the the total effective rate is just the

01:10:17.440 --> 01:10:21.000
 tax rate that effective rate will increase as we increase the debt service

01:10:21.000 --> 01:10:25.320
 tax rate but on the maintenance operation side we've kept that rate at

01:10:25.320 --> 01:10:35.920
 the okay thank you so 180 million three cents increase and then the hundred

01:10:35.920 --> 01:10:39.440
 million dollars has no tax rate increase on the debt service tax rate and actually

01:10:39.440 --> 01:10:43.880
 as you get to the the final years of this we are of this program we actually

01:10:43.880 --> 01:10:48.400
 our tax rate then goes on the debt service side below our current tax rate

01:10:48.400 --> 01:10:52.440
 I I think it's important to talk about the hundred million dollar scenario

01:10:52.440 --> 01:10:57.200
 because obviously when we spread a hundred million dollars out for six

01:10:57.200 --> 01:11:02.000
 years that's true we wanted apples to apples comparisons if we wanted to go

01:11:02.000 --> 01:11:05.760
 forward with a hundred million dollars in program we would really need to step

01:11:05.760 --> 01:11:09.880
 back and have a different discussion because to do the police station to the

01:11:09.880 --> 01:11:13.220
 renovation the substation and some of these street projects where we need a

01:11:13.220 --> 01:11:17.440
 lot of dollar dollars up front that may become a four-year program that does

01:11:17.440 --> 01:11:21.600
 have a debt service tax rate increase so we've shown this here and obviously we

01:11:21.600 --> 01:11:25.880
 could you know we would take a detailed look at how we would issue a hundred

01:11:25.880 --> 01:11:30.920
 million dollars but it would not be the same way that we would issue the other

01:11:30.920 --> 01:11:38.600
 scenarios okay we showed this chart previously just showing that gap between

01:11:38.600 --> 01:11:44.160
 the max tax rate and our history on the debt service tax rate side and that's

01:11:44.160 --> 01:11:47.440
 the chart that shows that we did four cents previous right so we have the four

01:11:47.440 --> 01:11:52.040
 cents there in 2005 and the gap between that and in 2014 we had the four cent

01:11:52.040 --> 01:11:55.800
 max that's that service tax rate increase and we stayed below that through

01:11:55.800 --> 01:12:04.680
 the life of that program so over these not these next few slides of show some

01:12:04.680 --> 01:12:10.120
 of the same information but just show the impact to our debt service tax rate

01:12:10.120 --> 01:12:14.880
 our debt service payments for each year of the different scenarios this came up

01:12:14.880 --> 01:12:19.160
 last week as we talked about the number of our total debt our total debt

01:12:19.160 --> 01:12:23.520
 outstanding versus what the debt we would issue would be and how all that

01:12:23.520 --> 01:12:27.560
 debt doesn't hit us at once that we have debt falling off as new debt arises so

01:12:27.560 --> 01:12:31.640
 our debt service payments are that obviously the payments we make each year

01:12:31.640 --> 01:12:37.280
 on our general government debt so this year about 25 million dollars in debt

01:12:37.280 --> 01:12:40.440
 service payments in general government and you can see if we were not to issue

01:12:40.440 --> 01:12:46.560
 anything going forward how it would drop off over the next 20 years and just

01:12:46.560 --> 01:12:50.720
 similar to a home payment where you have your interest out front and then you're

01:12:50.720 --> 01:12:55.560
 paying more principal later in the program so there are quite a few lines

01:12:55.560 --> 01:13:00.700
 here but I think there I can explain them fairly easily to everyone the red

01:13:00.700 --> 01:13:03.720
 line is all right what we just saw that's essentially our existing debt

01:13:03.720 --> 01:13:09.400
 service over the 20 years and you can see how it falls off the greed that the

01:13:09.400 --> 01:13:17.000
 blue line is that we just issued debt this this week with City Council to for

01:13:17.000 --> 01:13:21.680
 some certificates of obligation and for our 2014 bond program so you can see

01:13:21.680 --> 01:13:27.200
 that already increases that red line to our starting point the green air the

01:13:27.200 --> 01:13:32.160
 green line is the deditions I mentioned earlier the 2014 the fourteen point six

01:13:32.160 --> 01:13:37.360
 million dollars will be issuing and then the orange yellow line is are the

01:13:37.360 --> 01:13:40.840
 certificates of obligations I mentioned that will be issuing each of those years

01:13:40.840 --> 01:13:46.080
 for facility maintenance and and the vehicle replacement so essentially this

01:13:46.080 --> 01:13:51.200
 this yellow line becomes if we were to do not do a program at all and not do a

01:13:51.200 --> 01:13:56.840
 program any bond program over the life of you know the next 20-25 years what

01:13:56.840 --> 01:14:01.160
 would the impact be so if we were to do no bond programs for 25 years here's how

01:14:01.160 --> 01:14:07.400
 the debt service rate would decrease with the 235 million dollar number you

01:14:07.400 --> 01:14:10.520
 235 billion dollar program you can see how that debt service tax rate does

01:14:10.520 --> 01:14:14.320
 increase as we start as we issue those bonds and then starts decreasing as

01:14:14.320 --> 01:14:19.720
 we're just paying those those bonds off but to kind of tie it back to the

01:14:19.720 --> 01:14:24.040
 earlier conversations in this scenario essentially what we're saying is the

01:14:24.040 --> 01:14:31.860
 additional five cents max could pay for the difference between this blue line

01:14:31.860 --> 01:14:38.400
 and the purple line so that the tax rate increase does also pay for some of the

01:14:38.400 --> 01:14:42.440
 other debt will be issuing in future years and can you remind the committee

01:14:42.440 --> 01:14:47.240
 what the current total debt that the city has it's supported by property tax

01:14:47.240 --> 01:14:52.280
 sure I mean I'll pull it up to be exact about 260 million dollars but I have it

01:14:52.280 --> 01:15:00.440
 on this other presentation so 260 million dollars is our current outstanding debt

01:15:00.440 --> 01:15:04.600
 and so this would be if we did a 210 million dollar program we showed last

01:15:04.600 --> 01:15:09.240
 last week if you with the interest on that over the life of the debt we were

01:15:09.240 --> 01:15:13.480
 anticipating that would be about a 316 million dollar program so when you look

01:15:13.480 --> 01:15:17.400
 at those numbers side-by-side it looks like we're doubling our debt but because

01:15:17.400 --> 01:15:21.360
 as we showed the debt service is falling off on that existing debt and then is

01:15:21.360 --> 01:15:25.520
 getting to plan and obviously going above our current debt service amount but

01:15:25.520 --> 01:15:30.480
 that's how that interplay works and I think you said last week about 98

01:15:30.480 --> 01:15:35.580
 million would be retired over the life of this this current bond proposal yeah

01:15:35.580 --> 01:15:38.680
 over the six years of the bond program about 98 million of our current debt

01:15:38.680 --> 01:15:41.720
 would be retired

01:15:49.240 --> 01:15:53.440
 so the remaining slides just kind of emphasize the point on the debt service

01:15:53.440 --> 01:15:57.880
 tax rate as we have each scenario you can see that the jump there isn't quite

01:15:57.880 --> 01:16:03.280
 as much as we as we come down but a similar story and for the 180 and I

01:16:03.280 --> 01:16:07.040
 think it's I think just to point out even with this hundred million dollar

01:16:07.040 --> 01:16:11.920
 hundred million dollar program which we've looked at for comparison and we're

01:16:11.920 --> 01:16:15.160
 saying that would have no debt service tax or an increase and in fact a

01:16:15.160 --> 01:16:21.240
 decrease in latter years you still have it going up but what this increase in

01:16:21.240 --> 01:16:25.040
 assessed value that we're going to experience the debt service rate needed

01:16:25.040 --> 01:16:34.280
 to pay off is doesn't increase any questions on any of that

01:16:40.840 --> 01:16:45.640
 yeah so each so you can see it kind of as it goes up each year it's in 2020

01:16:45.640 --> 01:16:50.560
 we're issuing issuing our first round of issuance for bonds for the for the

01:16:50.560 --> 01:16:55.280
 program in 2021 we're issuing our next round and then all the way up to 2025 26

01:16:55.280 --> 01:16:59.160
 where we've issued the all of our bonds for the program and then it starts

01:16:59.160 --> 01:17:02.560
 decreasing because we're simply just paying the debt service down at that

01:17:02.560 --> 01:17:11.720
 point so keep this all in mind as we move here shortly to what what the

01:17:11.720 --> 01:17:16.640
 prioritization list is and where that running total is because that will be

01:17:16.640 --> 01:17:21.360
 part of what we ultimately are going to take up here in just a little bit David

01:17:21.360 --> 01:17:27.960
 you want to continue I I'll go through these slides but obviously Todd essence

01:17:27.960 --> 01:17:35.400
 here as we go through it we wanted to touch on the street rehab program and

01:17:35.400 --> 01:17:38.840
 the neighborhood streets and just make sure obviously this is a discussion

01:17:38.840 --> 01:17:43.100
 we've had previously but just to make sure everyone understands how what the

01:17:43.100 --> 01:17:47.680
 plan right now is just to spend that 70 million dollars and how it breaks down

01:17:47.680 --> 01:17:54.640
 for district and in different areas of the city so our neighbor the neighbor

01:17:54.640 --> 01:17:58.920
 one of the one of the opportunity the plans that we had as we move for look in

01:17:58.920 --> 01:18:02.880
 our street rehab program was to focus on neighborhood streets like neighborhood

01:18:02.880 --> 01:18:07.640
 street neighborhoods throughout the community and have that be the basis

01:18:07.640 --> 01:18:13.080
 that we that we that we that we did our street rehab program this year as we had

01:18:13.080 --> 01:18:17.000
 conversations with the committee and considered other alternatives we

01:18:17.000 --> 01:18:19.840
 ultimately decided to do the hybrid approach where we said we're going to

01:18:19.840 --> 01:18:24.560
 focus on these neighborhoods that we gain efficiencies on by having the roads

01:18:24.560 --> 01:18:27.760
 near each other having those connector streets able to do water or wastewater

01:18:27.760 --> 01:18:32.320
 improvements along with the street improvements along with the next slide

01:18:32.320 --> 01:18:35.880
 which will show the focus with the other half of the street rehab dollars on

01:18:35.880 --> 01:18:43.400
 those low OCI those the streets in the in the city with the lowest quality so

01:18:43.400 --> 01:18:47.480
 I'll just touch on the financials here quickly and then turn it over to Todd on

01:18:47.480 --> 01:18:50.840
 the neighborhoods on the neighborhood streets you can see with the

01:18:50.840 --> 01:18:55.040
 recommendation right now street the neighborhoods one three and four are

01:18:55.040 --> 01:19:01.160
 included in the 70 million dollars and I'll turn over to Todd to kind of go through those neighborhoods

01:19:01.160 --> 01:19:11.520
 Todd Estes City Engineer we've been through this just briefly but hopefully

01:19:11.520 --> 01:19:15.080
 just a little bit more detail and what the city staff has been working through

01:19:15.080 --> 01:19:19.840
 as we try to prioritize what goes into these neighborhoods this neighborhood

01:19:19.840 --> 01:19:23.800
 program as we would call it so we're looking at several different neighborhoods

01:19:23.800 --> 01:19:27.440
 in the area there's no again no prioritization assigned to these numbers

01:19:27.440 --> 01:19:30.480
 that was just when we numbered it we started at the top and we numbered going

01:19:30.480 --> 01:19:34.840
 down to the bottom it was one two three four five six seven that circle back up

01:19:34.840 --> 01:19:38.720
 to the middle there's no rhyme or reason to the numbers but we are going to roll

01:19:38.720 --> 01:19:42.520
 through just what these neighborhoods look like that we're proposing as the

01:19:42.520 --> 01:19:45.960
 top three neighborhoods that be included in this and and they do as we've talked

01:19:45.960 --> 01:19:51.480
 about before realize the actual lowest average OCI throughout those

01:19:51.480 --> 01:19:56.520
 neighborhoods of all those seven that we had considered these were the seven

01:19:56.520 --> 01:20:00.480
 worst as a neighborhood considered average OCI so the top three are the

01:20:00.480 --> 01:20:05.440
 ones that we were nominating to go forward in this program so as we look

01:20:05.440 --> 01:20:08.760
 into these streets and these neighborhoods so neighborhood four was

01:20:08.760 --> 01:20:12.880
 actually our lowest average OCI that is the southeast Denton there in

01:20:12.880 --> 01:20:17.080
 neighborhood area so if you look at that area we talked about last week that's

01:20:17.080 --> 01:20:20.960
 about twelve point eight lane miles of roadway that would be totally

01:20:20.960 --> 01:20:27.360
 reconstructed combined with that would be water wastewater improvements a lot

01:20:27.360 --> 01:20:31.520
 of aging infrastructure that needs to be improved all at the same time plus

01:20:31.520 --> 01:20:36.240
 there's another seven to thirteen lane miles of maintenance that needs to be

01:20:36.240 --> 01:20:42.480
 done with those roadways that are not in that 45 OCI and under they're over that

01:20:42.480 --> 01:20:46.880
 45 benchmark so that's still in the area where we would be doing maintenance I

01:20:46.880 --> 01:20:49.840
 don't care where you're on the city we'd be doing maintenance of different scales

01:20:49.840 --> 01:20:57.360
 different amounts over time to prolong their life the next neighborhood this

01:20:57.360 --> 01:21:01.400
 neighborhood once upon the north side of town through previous bond packages this

01:21:01.400 --> 01:21:05.240
 is one of those neighborhoods that really fell into that shotgun approach

01:21:05.240 --> 01:21:09.680
 we talked about in the past where we took the absolute lowest OCI we tackled

01:21:09.680 --> 01:21:15.200
 those in the bond program and then in an effort to try to stem some of the

01:21:15.200 --> 01:21:19.240
 frustration that the neighbors felt in those areas we came in with O&M money

01:21:19.240 --> 01:21:23.480
 and tried to tie those segments together so there were roadway pieces in that

01:21:23.480 --> 01:21:27.280
 neighborhood that were left out this closes the gap on that neighborhood so

01:21:27.280 --> 01:21:31.760
 that we're not coming back in the next 20 25 years working on roadways that we

01:21:31.760 --> 01:21:35.400
 did 30 years ago and then five years after that coming back and doing the

01:21:35.400 --> 01:21:39.720
 roads we could have done again so this closes that neighborhood that neighborhood

01:21:39.720 --> 01:21:46.240
 still on average has the lowest overall OCI up from the southeast Denton

01:21:46.240 --> 01:21:50.280
 neighborhood area so this would be the same and that we would be tackling all

01:21:50.280 --> 01:21:54.160
 of those infrastructure needs at one time the water wastewater drainage and

01:21:54.160 --> 01:22:02.240
 streets at the same time and then the next is neighborhood three that's really

01:22:02.240 --> 01:22:08.120
 over South University Drive more in that area around Denton High School just

01:22:08.120 --> 01:22:13.040
 north of North Texas north of the Hickory and Oak area this area still has

01:22:13.040 --> 01:22:19.120
 quite a few holes left in it from an overall OCI plus a lot of aging water

01:22:19.120 --> 01:22:22.680
 wastewater infrastructure that just needs to be addressed so that was where

01:22:22.680 --> 01:22:30.360
 number three came on staff's list as the top three projects those three round

01:22:30.360 --> 01:22:36.440
 out to about 39 million dollars combined when it just in roadway improvements

01:22:36.440 --> 01:22:39.160
 when you add in the water wastewater improvements it almost doubles that

01:22:39.160 --> 01:22:44.200
 number it's a nearly 70 to 80 million dollars worth of investment in those

01:22:44.200 --> 01:22:48.840
 neighborhoods that does not include the O&M costs that would also be associated

01:22:48.840 --> 01:22:55.680
 over time for those roadways that don't fall into this category of needing to be

01:22:55.680 --> 01:23:03.160
 totally reconstruction 45 or less so then the remainder of those roads were

01:23:03.160 --> 01:23:08.680
 what we've looked at how do we get to a 70 million dollar somebody had mentioned

01:23:08.680 --> 01:23:12.240
 as we got some savings out of Ryan Road somebody on this committee asked what if

01:23:12.240 --> 01:23:15.960
 we took to get up 70 million dollars so that we can round out that number to 210

01:23:15.960 --> 01:23:20.080
 again or some other things have happened for that numbers being considered to be

01:23:20.080 --> 01:23:25.240
 larger so at 70 million dollars the cutoff point for if we kind of do this

01:23:25.240 --> 01:23:29.520
 hybrid approach of we we tackle three neighborhoods that are in need

01:23:29.520 --> 01:23:35.120
 holistically and then address all of the worst roadways left we could get up to

01:23:35.120 --> 01:23:40.160
 about those roadways that are at 20 OCI and less so they're really on the lower

01:23:40.160 --> 01:23:44.960
 end spectrum of the OCI scale again that OCI goes from 100 being the best zero

01:23:44.960 --> 01:23:49.480
 being the worst 20 really becoming a safety problem as well as a maintenance

01:23:49.480 --> 01:23:54.960
 problem for us just consistently going out and doing things when you add those

01:23:54.960 --> 01:23:59.760
 elements back in that brings back up brings the total amount to roughly 70

01:23:59.760 --> 01:24:05.560
 million dollars it's 69.8 so round it a little bit as engineers we love to get

01:24:05.560 --> 01:24:10.360
 into significant figures and that's where we ended up at 69.8 but it's 70

01:24:10.360 --> 01:24:13.320
 I can take into account some other things you can get there so this map

01:24:13.320 --> 01:24:19.000
 shows one of the questions we had what does what does the 70 million dollars do

01:24:19.000 --> 01:24:23.840
 from a council district perspective how many of those roadways how many lane

01:24:23.840 --> 01:24:28.160
 miles how much money is going to each district so what this chart really shows

01:24:28.160 --> 01:24:33.040
 you is that and I don't know why the average OCI is popping up here that was

01:24:33.040 --> 01:24:39.480
 left over that has nothing to do with this up here my apologies for that these

01:24:39.480 --> 01:24:43.460
 when you look at this we were broken into two groups so you've got the

01:24:43.460 --> 01:24:49.880
 neighborhoods which are these lines in blue so they still contribute to how

01:24:49.880 --> 01:24:54.240
 much money of that 70 million we would be putting into that into this bond

01:24:54.240 --> 01:24:59.000
 package so we group them by district so if you see an N next to the number

01:24:59.000 --> 01:25:03.120
 district one N is that neighborhood so that's that southeast Denton

01:25:03.120 --> 01:25:08.120
 neighborhood for district one looking at roughly 11 million dollars in roadway

01:25:08.120 --> 01:25:14.120
 cost of that 70 million and then there's another 6.3 miles lane miles of work to

01:25:14.120 --> 01:25:19.160
 be done in the 20 and under OCI category that doesn't lie just within that

01:25:19.160 --> 01:25:24.080
 neighborhood so that brings it total investment in that area to roughly 17

01:25:24.080 --> 01:25:28.620
 million dollars so that's really how you read this chart the total comes up to

01:25:28.620 --> 01:25:33.160
 70 million dollars but anytime you see that in it's that neighborhood and of

01:25:33.160 --> 01:25:37.640
 course see in district for we're not proposing a neighborhood at this time to

01:25:37.640 --> 01:25:43.360
 go into this program by and large most of those streets will be handled by the

01:25:43.360 --> 01:25:47.860
 current ongoing maintenance program that we have and then at a later date there

01:25:47.860 --> 01:25:53.120
 will be roadways that fall under a future bond package then you've also got

01:25:53.120 --> 01:25:59.080
 3.9 million in low OCI roadways in district for so any questions about what

01:25:59.080 --> 01:26:03.840
 this charts show and this map

01:26:03.840 --> 01:26:12.560
 does this include streets that have OCI of 20 or less that will be reconstructed already with previous bond funding no it's

01:26:12.560 --> 01:26:20.920
 correct and does this include streets of 20 or less that will be funded in this

01:26:20.920 --> 01:26:24.080
 bond program but don't fit within one of those one two three or four

01:26:24.080 --> 01:26:28.400
 neighborhoods yes that's why the separation between those two lines so

01:26:28.400 --> 01:26:33.600
 there are streets that fall 20 unless 25 unless they're in that neighborhood so

01:26:33.600 --> 01:26:38.300
 the two categories are separate from each other so yeah so I'm speaking like

01:26:38.300 --> 01:26:42.480
 for instance if I just look at the map there's one street just south of Windsor

01:26:42.480 --> 01:26:49.040
 on the west side of town next to I-35 way west oh back over here yes that's

01:26:49.040 --> 01:26:53.120
 not in any one of the four neighborhoods that you've identified right now you can

01:26:53.120 --> 01:26:57.560
 see the neighborhoods we've identified yeah they are the blue lines so here's

01:26:57.560 --> 01:27:01.800
 this is number four neighborhood four this is neighborhood three and this is

01:27:01.800 --> 01:27:05.760
 neighborhood one those are those blue lines okay so these kind of purpley pink

01:27:05.760 --> 01:27:10.800
 lines those are all the other streets that are under a 20 OCI yes everywhere

01:27:10.800 --> 01:27:14.720
 else in the city understood and are those pink lines it elsewhere in the

01:27:14.720 --> 01:27:18.800
 city are those included in this table that's that's what this second line is

01:27:18.800 --> 01:27:24.360
 right here those are all the OCI is these pink lines okay those are the low

01:27:24.360 --> 01:27:30.680
 OCI streets 20 and under that are within district 1 and then here the same thing

01:27:30.680 --> 01:27:36.920
 for district 2 okay I'll have to go back to a previous presentation because I in

01:27:36.920 --> 01:27:40.560
 my notes I had that it was about a hundred and one or a hundred and two lane

01:27:40.560 --> 01:27:49.800
 miles for the total reconstruction program I know there are segments 102

01:27:49.800 --> 01:27:55.320
 segments maybe confusing segments and lane miles okay thank you very much

01:27:55.320 --> 01:28:01.160
 what's the one what's one in where's that where are we handling so district one

01:28:01.160 --> 01:28:05.240
 is here okay so one in is the neighborhood we're proposing as far as

01:28:05.240 --> 01:28:08.720
 back in so that's that southeast end in the neighborhood that's all these lines

01:28:08.720 --> 01:28:13.600
 in blue and then there are other roads within district one that are also under

01:28:13.600 --> 01:28:19.080
 20 OCI and they are these pinkish purple lines within district one that's what

01:28:19.080 --> 01:28:21.920
 the second line shows

01:28:21.920 --> 01:28:34.800
 other questions or let's move on to the next slide so just reiterating how we

01:28:34.800 --> 01:28:38.960
 kind of arrived at this program it really is a hybrid of what we've done in

01:28:38.960 --> 01:28:42.200
 the past where we would like to go is more the neighborhood approach so we

01:28:42.200 --> 01:28:46.160
 really impact a neighborhood one time and then not have to come back other

01:28:46.160 --> 01:28:50.760
 than minor maintenance for a good 30 to 40 years longer if we get that lifespan

01:28:50.760 --> 01:28:54.320
 how that roadway through the robust maintenance program that we have right

01:28:54.320 --> 01:28:58.520
 now so that would be the goal but recognizing we still have a lot of

01:28:58.520 --> 01:29:03.040
 streets that need that attention that are leftover from a lot of inattention

01:29:03.040 --> 01:29:08.960
 over years we're combining that with the old shotgun approach which has been the

01:29:08.960 --> 01:29:13.760
 the preferred preferred model from the previous bond packages so we're marrying

01:29:13.760 --> 01:29:16.560
 the two together

01:29:16.560 --> 01:29:31.560
 do we have so the neighborhood approach takes OCI 40 below do we have a map that

01:29:31.560 --> 01:29:37.960
 shows every 40 below street in the city yeah we actually have every street

01:29:37.960 --> 01:29:42.240
 within the city and it's current OCI mapped and then we'll be double

01:29:42.240 --> 01:29:48.600
 checking that degradation model surveyed in 2015 we'll be doing that again this

01:29:48.600 --> 01:29:52.760
 fall so that we can check our models to make sure they're accurate and what

01:29:52.760 --> 01:29:58.480
 they're predicting is that I'm sure it's probably not available tonight but I

01:29:58.480 --> 01:30:09.400
 would be curious to see that just just to see I like the neighborhood approach

01:30:09.400 --> 01:30:22.360
 David will do the technical okay we do have that mapping and we did show it at

01:30:22.360 --> 01:30:26.800
 a previous presentation where it showed all the streets within the city and we

01:30:26.800 --> 01:30:31.720
 can break it down all the way down to a one-point difference it's hard to read

01:30:31.720 --> 01:30:35.480
 the map what we had broken down was arranged very much like this where it's

01:30:35.480 --> 01:30:39.280
 color-coded we can see all the streets that we we know of throughout the city

01:30:39.280 --> 01:30:43.480
 of it now this does not include new developments that have been placed since

01:30:43.480 --> 01:30:47.000
 2015 that's what the new survey will also capture is all those new

01:30:47.000 --> 01:30:52.840
 developments as well right any any guess if we did the neighborhood approach and

01:30:52.840 --> 01:31:03.080
 instead of 20 OCI we took it to 30 OCI I guess yes it's hard to get an idea of

01:31:03.080 --> 01:31:09.520
 how bad an OCI 20 Street is so if you go to a third and agree I mean once you

01:31:09.520 --> 01:31:17.240
 start getting below 40 it's difficult it's varying degrees of bad so a street

01:31:17.240 --> 01:31:21.860
 that falls into a 20 OCI may have a variety of issues with it one what we

01:31:21.860 --> 01:31:26.240
 would call base failure but you would see it as several segments of the road

01:31:26.240 --> 01:31:30.400
 really dropping beyond another segment of road we might see some heave where

01:31:30.400 --> 01:31:33.800
 one piece of the road elevates over the others you see a lot of large potholes

01:31:33.800 --> 01:31:38.040
 you'd see a lot of what we would call alligator cracking it looks just like an

01:31:38.040 --> 01:31:43.480
 alligator scales across the pavement as those get wider water infiltrates into

01:31:43.480 --> 01:31:47.320
 them then you start running into issues or whether roadway tires on the roadways

01:31:47.320 --> 01:31:51.320
 start pulling them up as they hit them if we go through any kind of freeze

01:31:51.320 --> 01:31:56.480
 thaw cycle the once or twice in a year we get here if there's water in those

01:31:56.480 --> 01:32:00.720
 points they also get in there water expands pulls that stuff up and then you

01:32:00.720 --> 01:32:04.800
 get your next pothole so they may also be base failures there's a there's a

01:32:04.800 --> 01:32:10.480
 whole host of things that could happen once you get below that 30 OCI but it

01:32:10.480 --> 01:32:15.520
 from a number standpoint our estimate has been about 95 million just to

01:32:15.520 --> 01:32:23.200
 address 30 and less that doesn't include the neighborhood right right okay so if

01:32:23.200 --> 01:32:29.440
 I'm reading this correctly so zero to 20 is 35 so the neighborhood approach is

01:32:29.440 --> 01:32:33.720
 about 35 and we've refined that since since why these numbers are just a

01:32:33.720 --> 01:32:37.080
 little bit different now we continue to refine that number it's actually just a

01:32:37.080 --> 01:32:44.400
 little over so if we wanted to raise the standard to zero to 25 plus the

01:32:44.400 --> 01:32:49.580
 neighborhood it'd be another 25 million dollars yes okay that's that's where I

01:32:49.580 --> 01:32:57.120
 was trying okay I have a question about the roads and everything because this

01:32:57.120 --> 01:33:01.880
 afternoon actually this morning as I came back into my house there was a

01:33:01.880 --> 01:33:07.320
 water main break underneath the road on Locust anybody trying to go north on

01:33:07.320 --> 01:33:14.160
 Locust yeah sorry but so when you're looking at the OCI you're looking at the

01:33:14.160 --> 01:33:18.840
 top layer obviously yes and then the banks and are you looking at the water

01:33:18.840 --> 01:33:23.960
 mains underneath it and the age of those water mains so we were it doesn't fall

01:33:23.960 --> 01:33:28.940
 into the OCI because that strictly is a pavement assessment but the water

01:33:28.940 --> 01:33:33.400
 department the wastewater department has a similar so categories that they line

01:33:33.400 --> 01:33:36.360
 up all that grade all their infrastructure similarly and then we

01:33:36.360 --> 01:33:41.040
 work with them Danny is it quarterly monthly that y'all are talking about

01:33:41.040 --> 01:33:47.120
 your next 30 60 90 and then five-year outlook monthly they're working closely

01:33:47.120 --> 01:33:54.520
 together to make sure that water with it being under pressure when a pipe gets to

01:33:54.520 --> 01:33:59.160
 be 20 30 years old or there could be other things coming online if just a lot

01:33:59.160 --> 01:34:04.880
 of different things that could happen in the 1940s right yeah because that I mean

01:34:04.880 --> 01:34:09.480
 that affects those three neighborhoods too that we've looked at that's one of

01:34:09.480 --> 01:34:14.880
 many reasons why some of those roads are so bad is the underlying and that's

01:34:14.880 --> 01:34:18.600
 exactly why we want to go to this more holistic neighborhood approach is we

01:34:18.600 --> 01:34:23.220
 want to replace everything in that roadway so that it's not that problem

01:34:23.220 --> 01:34:25.840
 going forward

01:34:39.480 --> 01:34:49.760
 there is I mean from one standpoint we can actually contract a lot of this

01:34:49.760 --> 01:34:54.840
 work out to a general contractor and he handles we get a lot of economies of

01:34:54.840 --> 01:34:59.520
 scale so we can get the price points better we can get the work done faster

01:34:59.520 --> 01:35:04.040
 because the general contractor is in control of all of those facets the water

01:35:04.040 --> 01:35:08.640
 the wastewater the drainage the roadway he can schedule it it's his task to be

01:35:08.640 --> 01:35:14.280
 done city crews what typically happens for our crews is we get called from one

01:35:14.280 --> 01:35:17.680
 construction site to an emergency and then another emergency and then we

01:35:17.680 --> 01:35:21.360
 disappear from a construction site not because we don't want to be there but

01:35:21.360 --> 01:35:25.120
 because there's another emergency like a water main break on locust that we've

01:35:25.120 --> 01:35:29.200
 got to go and what people don't realize is as soon as the water department goes

01:35:29.200 --> 01:35:33.680
 then following right behind them is the street department is they've got to come

01:35:33.680 --> 01:35:37.680
 in they've got to fix that roadway piece now that had to be torn up just to get

01:35:37.680 --> 01:35:43.240
 to the waterline so you get better economies of scale just from a price

01:35:43.240 --> 01:35:47.360
 point and then how quickly we can get the work done because we're not so

01:35:47.360 --> 01:35:51.160
 distracted and distractions not because we're not focused on the work it's just

01:35:51.160 --> 01:35:56.280
 there's so much work to be done and very few crew members to actually go do the

01:35:56.280 --> 01:36:01.360
 work internally it's a better use of staff time and resources as well as

01:36:01.360 --> 01:36:04.640
 taxpayer dollars to let them do what they're really good at we can put them

01:36:04.640 --> 01:36:07.960
 where the emergency and the high priority is but not keep them focused for

01:36:07.960 --> 01:36:14.520
 months on end right there if I could suggest let's let's try to finish this

01:36:14.520 --> 01:36:19.560
 part of the presentation and then we'll be taking we'll take a short break but

01:36:19.560 --> 01:36:24.500
 let's get through the rest of the of the initial presentation and when we come

01:36:24.500 --> 01:36:28.960
 back we'll be moving into the prioritization list

01:36:34.640 --> 01:36:46.040
 okay so any more questions on the neighborhood streets okay so the next

01:36:46.040 --> 01:36:51.200
 next item that we took as a task this last week was give you an idea of what

01:36:51.200 --> 01:36:56.320
 does say a 10 million dollar Ryan Road look like versus a 25 million dollar

01:36:56.320 --> 01:37:11.120
 Ryan Road look like so really the difference between those two spectrums

01:37:11.120 --> 01:37:17.760
 was how much do we want to invest today into Ryan Road our current area study

01:37:17.760 --> 01:37:24.200
 for that area shows that the demand for Ryan while still the roadway needs to be

01:37:24.200 --> 01:37:28.020
 improved it doesn't need to be improved to a four lane divided roadway which

01:37:28.020 --> 01:37:33.280
 also helps us on some of the cost it shows that long term up to 2040 our

01:37:33.280 --> 01:37:37.080
 current projections are you really don't need more than a three lane roadway and

01:37:37.080 --> 01:37:40.520
 that's to help with the vast majority of these neighborhoods that are come have

01:37:40.520 --> 01:37:44.960
 come in over time where the roadways don't line up as intersections which

01:37:44.960 --> 01:37:49.240
 allows us to put in a four lane divided roadway or a two lane divided if you

01:37:49.240 --> 01:37:53.240
 ever had a chance to need one where I can put in a left turn bay and get

01:37:53.240 --> 01:37:58.580
 people off the travel lane to make their left turn when you have so many left

01:37:58.580 --> 01:38:02.840
 turns all the way throughout a corridor then the best thing to do is to put in

01:38:02.840 --> 01:38:06.680
 that middle lane to where you can allow people to get out of the travel lanes

01:38:06.680 --> 01:38:10.920
 and get in the middle you see the similar effect when you build a four

01:38:10.920 --> 01:38:16.280
 lane roadway with no median a four lane roadway works almost exactly like a

01:38:16.280 --> 01:38:20.560
 three lane roadway because what happens is as you develop you get the same thing

01:38:20.560 --> 01:38:24.520
 the inside lanes become left turn lanes that's where people sit and wait to turn

01:38:24.520 --> 01:38:29.760
 and now you've only got the outside lanes left so where we've pushed is as

01:38:29.760 --> 01:38:35.960
 we start looking at more of a truly contact sensitive roadway where I'm gonna

01:38:35.960 --> 01:38:40.440
 put in all modes of transportation is how much roadway do I really need for a

01:38:40.440 --> 01:38:44.920
 vehicle for the motorist and how much room do I could I also use not to build

01:38:44.920 --> 01:38:48.880
 a very big road and a lot of expense going into the road but also put in

01:38:48.880 --> 01:38:52.420
 pedestrian infrastructure bicycle infrastructure take care of the

01:38:52.420 --> 01:38:57.880
 drainage issues and floodplain issues that exist so one option would be if we

01:38:57.880 --> 01:39:03.080
 went with the ten million dollar option would be that we would go to the state

01:39:03.080 --> 01:39:06.880
 for the intersection improvements on both ends of Ryan so they they have a

01:39:06.880 --> 01:39:12.700
 policy of within 600 feet of an intersection that the state engages in

01:39:12.700 --> 01:39:17.880
 intersection improvements so that is an a hurdle that we are working with the

01:39:17.880 --> 01:39:23.360
 state on just to get that piece done as they work 2181 and 1830 they have

01:39:23.360 --> 01:39:27.220
 dollars for both we know that exactly for 2181 because everybody's seen the

01:39:27.220 --> 01:39:32.440
 cone still sitting out there and then 1830 they are we're working with them

01:39:32.440 --> 01:39:36.960
 currently on what is 1830 look like as they have dollars coming to the table

01:39:36.960 --> 01:39:42.560
 over the next two years to spend on that roadway so those two projects and where

01:39:42.560 --> 01:39:47.320
 we're pulling about six million dollars off of the overall budget whether you're

01:39:47.320 --> 01:39:50.960
 doing the 10 million or 25 million dollar option that's intersection

01:39:50.960 --> 01:39:57.280
 improvements purely so the remainder is how far would you like to go to put some

01:39:57.280 --> 01:40:01.040
 improvement into Ryan Road so that 4 million would allow us to basically

01:40:01.040 --> 01:40:06.240
 construct three lanes but really not a whole lot else out there so we could put

01:40:06.240 --> 01:40:12.280
 the three-lane roadway in but the other amenities the side paths bicycle paths

01:40:12.280 --> 01:40:17.040
 walking paths a lot of the street lights and you'll see that on the next slide

01:40:17.040 --> 01:40:23.200
 you know street lights the street trees kind of give it a much more accessible

01:40:23.200 --> 01:40:29.320
 feel a more aesthetic feel that scenario would be more of the 20 million or the

01:40:29.320 --> 01:40:32.920
 19 million dollar investment on our side because it does address a lot of other

01:40:32.920 --> 01:40:37.760
 issues one of the other driving factors here is your drainage of improvements

01:40:37.760 --> 01:40:42.040
 you really I know this graphic shows curb and gutter on both sides it would

01:40:42.040 --> 01:40:47.320
 not be curb and gutter is one of the largest pieces from a cost perspective

01:40:47.320 --> 01:40:51.760
 in any one of these roadway projects is drainage and if I'm only having to focus

01:40:51.760 --> 01:40:55.860
 on the low spots on the road improve that culvert and build it up so that it

01:40:55.860 --> 01:40:59.760
 does handle the hundred-year storm but I don't have to put in curb and gutter

01:40:59.760 --> 01:41:06.080
 storm inlets storm drain pipes down the entire length of the roadway my cost goes

01:41:06.080 --> 01:41:10.780
 down substantially so I'm relying on bar ditches at that point and it still has

01:41:10.780 --> 01:41:15.480
 much more of that rural feel to it similar to what's out there today so

01:41:15.480 --> 01:41:20.040
 that's the biggest jump in cost when we start going down that pathway this would

01:41:20.040 --> 01:41:24.680
 also the this 10 million dollar option would also not be three lanes the entire

01:41:24.680 --> 01:41:28.960
 length it would be through segments where it made the most sense so it'd be like

01:41:28.960 --> 01:41:32.400
 segments in front of the school to make sure that there was plenty of room for

01:41:32.400 --> 01:41:36.040
 queuing of vehicles for pedestrians and students to get where they need to go

01:41:36.040 --> 01:41:40.840
 and then some of the other places along that area which we were still in the

01:41:40.840 --> 01:41:45.460
 process of figuring out where exactly would those locations be the overall 25

01:41:45.460 --> 01:41:48.760
 million dollar project would get you the three lanes the entire length with all

01:41:48.760 --> 01:41:55.360
 the other amenities so that just gives you a snapshot of what is really the

01:41:55.360 --> 01:42:02.080
 difference between these two projects any questions yes ma'am two questions one

01:42:02.080 --> 01:42:07.520
 sidewalks in front of the school not an option right there have to have sidewalks

01:42:07.520 --> 01:42:10.880
 in front of this we don't disagree with you on that one and that's not where we

01:42:10.880 --> 01:42:14.840
 would be talking about not doing that that would absolutely be part of our

01:42:14.840 --> 01:42:20.040
 safe rest the school program as well so that would be a yeah yeah yeah aren't

01:42:20.040 --> 01:42:23.760
 they already there I think are in front of that school I think so

01:42:23.760 --> 01:42:36.200
 Ryan they're only on Ryan but they're not from the neighborhood so it would be

01:42:36.200 --> 01:42:41.640
 nice if we could complete that but my other my other question is Teasley which

01:42:41.640 --> 01:42:48.920
 part of Teasley is kind of constructed like God help us it is the segment from

01:42:48.920 --> 01:42:53.720
 Teasley and Teasley where Lillian Miller then takes off north and then go and it's

01:42:53.720 --> 01:42:59.120
 all the way south to right around the corner of Geier high school so all of

01:42:59.120 --> 01:43:04.640
 Teasley yes and I know it's going to be two to three years before pretty much

01:43:04.640 --> 01:43:10.040
 before that's before it's completed so that project is has a challenge right

01:43:10.040 --> 01:43:14.240
 now from the standpoint that the contractor that text on had contractor

01:43:14.240 --> 01:43:18.800
 with went bankrupt right so they terminated that contract we do understand

01:43:18.800 --> 01:43:22.140
 from text out that they have a new contractor coming on board through their

01:43:22.140 --> 01:43:26.320
 bonding company and they're negotiating terms with that as far as a timeline of

01:43:26.320 --> 01:43:31.960
 when they get started I don't know okay because how would that impact the

01:43:31.960 --> 01:43:38.280
 construction of Ryan Road it wouldn't miss well I mean any construction has an

01:43:38.280 --> 01:43:42.840
 impact but as far as timing it wouldn't necessarily impact the Ryan Road

01:43:42.840 --> 01:43:48.040
 construction even in the intersections on both ends is typically when we're

01:43:48.040 --> 01:43:50.680
 working with the state there's always the fundamental question if their state

01:43:50.680 --> 01:43:54.840
 funds tied to it of are you building it or am I building it and then we enter

01:43:54.840 --> 01:43:58.360
 into what's called a local project advanced funding agreement and we

01:43:58.360 --> 01:44:03.360
 determine who's building who's doing what and that would go to council as far

01:44:03.360 --> 01:44:07.680
 as would we build that piece I would say we probably would that would be our

01:44:07.680 --> 01:44:11.600
 posture at the point but until we really negotiate the terms of that agreement I

01:44:11.600 --> 01:44:19.880
 wouldn't tell you where it landed I had a question about the sidewalks and things

01:44:19.880 --> 01:44:24.920
 on Ryan Road and I understand on both sides you would need to do the drainage

01:44:24.920 --> 01:44:28.680
 and you would do sidewalks on both sides and that's what's bringing it up to that

01:44:28.680 --> 01:44:34.840
 cost of 19 million right because the neighborhoods the housing primarily is

01:44:34.840 --> 01:44:41.400
 on the one side and then the school is on the other side so you kind of need

01:44:41.400 --> 01:44:47.200
 that the sidewalks getting from the neighborhoods and everything so you'd

01:44:47.200 --> 01:44:52.160
 want to have sidewalks on both sides right if you wouldn't just do sidewalks

01:44:52.160 --> 01:44:57.080
 on one side of Ryan for the 25 million we wouldn't that would be sidewalks on

01:44:57.080 --> 01:45:16.280
 both sides yes it wouldn't be anywhere near that price I mean sidewalks is not

01:45:16.280 --> 01:45:20.480
 a cost differentiator and it could be something that would be rolled into the

01:45:20.480 --> 01:45:26.800
 sidewalk program in general just because of the elementary school because of the

01:45:26.800 --> 01:45:30.480
 neighborhoods because that's where the retirement village is that's where

01:45:30.480 --> 01:45:48.200
 Wrigley Park is I mean there's a lot of walking that's done on yes and I believe

01:45:48.200 --> 01:45:52.560
 the sidewalk actually exists from Forest Ridge all the way over to the school so

01:45:52.560 --> 01:46:02.880
 that is in place right it's continuing and the challenge here is you've also

01:46:02.880 --> 01:46:08.560
 got a division in the school district here so when you follow El Paseo these

01:46:08.560 --> 01:46:14.120
 homes all filter to Ryan everything to the north of it all goes to Sam Houston

01:46:14.120 --> 01:46:17.080
 and they're in the same boat there's really not a sidewalk network over on

01:46:17.080 --> 01:46:24.200
 that side for children to walk over that way so there are several ways to get

01:46:24.200 --> 01:46:28.080
 there our first focus would be looking at safe routes to the school program and

01:46:28.080 --> 01:46:33.000
 that tends to be where we get the biggest bang for our buck

01:46:33.000 --> 01:46:45.760
 so a question in the past it had come up as to how much money had been spent the

01:46:45.760 --> 01:46:51.040
 southeast Denton neighborhood area and this just gives you an idea of the

01:46:51.040 --> 01:46:57.600
 funding from the 2014 bond segments that was actually put in to the southeast

01:46:57.600 --> 01:47:01.520
 Denton area one of the areas that I know is under construction currently this

01:47:01.520 --> 01:47:07.760
 curling right water and wastewater and then the roadway comes after that so

01:47:07.760 --> 01:47:13.800
 that's currently under construction right now and then you've got a list of

01:47:13.800 --> 01:47:19.280
 the different streets here where we've done some work within that area over the

01:47:19.280 --> 01:47:24.360
 in the previous bonds the question was asked that where it is we're absolutely

01:47:24.360 --> 01:47:29.560
 looking forward in 2019 to be able to put a vast majority of resources into

01:47:29.560 --> 01:47:33.320
 that area and bring it up to where it should be so do we plan on having these

01:47:33.320 --> 01:47:39.880
 streets that are remaining completed by 2019 I'm sorry can you tell me that

01:47:39.880 --> 01:47:44.320
 again I'm some of the streets in southeast Denton that are on those 2014

01:47:44.320 --> 01:47:48.440
 that are left remaining to be fixed are we planning on having them complete it

01:47:48.440 --> 01:47:53.200
 this year next year it'd be 2020 I believe it's what the last on that

01:47:53.200 --> 01:47:56.600
 streets segments would be from the last time we looked at that prioritization it

01:47:56.600 --> 01:48:00.040
 would just it'd be 2020 we have a whole host of roadway segments that will last

01:48:00.040 --> 01:48:06.840
 linger into 2020 to complete the 2014 bond so this is the amount that's

01:48:06.840 --> 01:48:12.760
 actually been spent on repairing southeast didn't on it from the 2014

01:48:12.760 --> 01:48:20.280
 bond right 2012 and 2014 right did you have the maintenance numbers overall

01:48:20.280 --> 01:48:23.320
 man is that what this is okay so that's the street maintenance we put in you

01:48:23.320 --> 01:48:27.920
 remember how many lane miles that was so maintenance dollars typically go a lot

01:48:27.920 --> 01:48:34.760
 further then total reconstruct dollars so from a maintenance standpoint we can

01:48:34.760 --> 01:48:38.200
 tell you of the actual distances but that is the amount of money understood

01:48:38.200 --> 01:48:41.560
 that was a question before and we can get more detail if you would like that

01:48:41.560 --> 01:48:46.520
 the actual dollar spent that is where it is okay yes I would now I do have a

01:48:46.520 --> 01:48:53.400
 question um with southeast didn't we have a lot of streets that need to be

01:48:53.400 --> 01:48:59.520
 repaired but we're trying to do an area over here by Argyle where the residents

01:48:59.520 --> 01:49:04.560
 haven't even agreed to it yet when we can either cut it down go a different

01:49:04.560 --> 01:49:09.400
 direction and spend this in southeast didn't or central didn't to where we

01:49:09.400 --> 01:49:13.640
 don't take them out for their property or cutting to their property or we can

01:49:13.640 --> 01:49:20.200
 push it for further back I mean push it back to where we can wait and do it

01:49:20.200 --> 01:49:23.880
 another time like in April of 2020 instead of right now because these are

01:49:23.880 --> 01:49:27.240
 other areas that need to be fixed why haven't we done why aren't we

01:49:27.240 --> 01:49:31.320
 considering that that is the purview of this committee this was our starting

01:49:31.320 --> 01:49:36.320
 point this is the purview that committee to have that conversation when we come

01:49:36.320 --> 01:49:40.080
 back after the break we're going to go into those specific projects and that'll

01:49:40.080 --> 01:49:48.080
 be the appropriate time to really dig into that okay that's fine okay so with

01:49:48.080 --> 01:49:52.480
 the bond that we have now we're looking at ten point eight million for southeast

01:49:52.480 --> 01:50:01.880
 in yes ma'am right I know in the bond reconstruction dollars right for streets

01:50:01.880 --> 01:50:05.880
 that's just for streets the water wastewater dollars approach almost 13

01:50:05.880 --> 01:50:08.720
 million dollars and then overall maintenance for the other roadways that

01:50:08.720 --> 01:50:12.760
 don't fall into the 45 and under category that's another two million

01:50:12.760 --> 01:50:16.360
 dollars two and a half million dollars that gets put into southeast Denton as

01:50:16.360 --> 01:50:26.400
 well there was a street that was just fixed bushy bushy Street in southeast

01:50:26.400 --> 01:50:29.920
 didn't there was nothing wrong with it can we tell can you tell me why was it

01:50:29.920 --> 01:50:36.920
 redone I'd have to look into the particulars I don't know and I'm asking

01:50:36.920 --> 01:50:39.760
 about this tree because it's a block away from me and I drive down this

01:50:39.760 --> 01:50:46.720
 street everyday I couldn't tell you what was actually the impetus there it could

01:50:46.720 --> 01:50:51.520
 have been a host of reasons and I don't know a lot of times reconstruction also

01:50:51.520 --> 01:50:56.280
 gets confused with I know my wife did this with one project where on our

01:50:56.280 --> 01:50:59.680
 street they blocked off the entire street after having rebuilt the entire

01:50:59.680 --> 01:51:02.680
 roadway about a year and a half before and they came out blocked off the whole

01:51:02.680 --> 01:51:06.120
 street and then they were gone by the end of the day but not after five phone

01:51:06.120 --> 01:51:09.120
 calls from her telling me you're out here building the roadway again and what

01:51:09.120 --> 01:51:12.760
 they were doing was maintenance on that roadway so that's why I stopped and

01:51:12.760 --> 01:51:21.080
 talked to the guys and I asked them was there any water leakage or anything or

01:51:21.080 --> 01:51:25.120
 the pipes or why they were actually fixing that stream they told me no we

01:51:25.120 --> 01:51:30.000
 just wanted we just came out to fix it really I have his name written down so

01:51:30.000 --> 01:51:33.360
 that would be good if you let me know how it is but I'd have to look into that

01:51:33.360 --> 01:51:41.760
 okay anything else that we need to address with Tom before we take a break

01:51:41.760 --> 01:51:50.640
 here yeah yeah and it says five minutes so let's take a break five minutes we

01:51:50.640 --> 01:51:54.480
 do have quite a bit of work still to do and we'll come back and we'll get into

01:51:54.480 --> 01:52:04.280
 the prioritization way as return as we return to our meeting of the bond

01:52:04.280 --> 01:52:10.080
 committee we're going to move into prioritization questions and to start

01:52:10.080 --> 01:52:15.680
 off this part of our meeting we'll turn back to Todd we've had obviously a lot

01:52:15.680 --> 01:52:20.240
 of questions about Hickory Creek Road and and let's try to address those

01:52:20.240 --> 01:52:29.200
 questions all right so Hickory Creek Road it was a hot button earlier this year

01:52:29.200 --> 01:52:36.160
 and it still continues to be that so one of the issues that I've heard raised so

01:52:36.160 --> 01:52:40.840
 far is why the six lane facility well six lane facility was on the 2015

01:52:40.840 --> 01:52:46.240
 mobility plan the traffic demand model used to develop that had shown Brush

01:52:46.240 --> 01:52:52.840
 Creek Hickory Creek going all the way over to 35 W you have it up so this is

01:52:52.840 --> 01:52:58.960
 the 2015 mobility plan this is what was approved in 2015 these red lines are

01:52:58.960 --> 01:53:02.880
 primary roadways they're arterial roadways they would be up to a six lane

01:53:02.880 --> 01:53:07.520
 roadway it was contemplated in 15 that these roadways with this is Brush Creek

01:53:07.520 --> 01:53:12.440
 here all red continuing over and then ultimately as development progressed on

01:53:12.440 --> 01:53:16.480
 the west side of 35 W there would be an interchange in frontage roads and you are

01:53:16.480 --> 01:53:20.600
 seeing that today with text dot now bringing the project forward to build

01:53:20.600 --> 01:53:26.920
 frontage roads on I 35 W that's the next step in this 35 W improvement so as the

01:53:26.920 --> 01:53:30.040
 frontage roads come they will build that piece and then the main lanes get

01:53:30.040 --> 01:53:33.680
 improved along with all of these improvements to the interchange is so

01:53:33.680 --> 01:53:41.280
 that long term already does become an interchange now one of the concerns I've

01:53:41.280 --> 01:53:48.000
 heard raised it has been why a four lane or a six lane roadway could we squeeze

01:53:48.000 --> 01:53:51.920
 it down to a four lane absolutely that is absolutely where our study tells us

01:53:51.920 --> 01:53:59.120
 we did an area study because we didn't know exactly where the 2015 model came

01:53:59.120 --> 01:54:02.440
 from when it was really looking at its connectivity points where these points

01:54:02.440 --> 01:54:08.100
 were ties into the highway it the models only as good as those tying points so as

01:54:08.100 --> 01:54:13.520
 we start looking at alternatives this 2015 mobility plan is one alternative the

01:54:13.520 --> 01:54:17.600
 other alternative would be bringing a Hickory Creek over the floodplain

01:54:17.600 --> 01:54:22.920
 straightening out this roadway bringing it all the way across at 35 which does I

01:54:22.920 --> 01:54:28.320
 know it sounds a little reverse and the logic but yes a lot of people travel

01:54:28.320 --> 01:54:34.720
 1830 and 377 and 2181 today because they have no other option north they could

01:54:34.720 --> 01:54:38.600
 travel those two lane roadways but where they're trying to get to takes them

01:54:38.600 --> 01:54:42.360
 north which is also causing some of the increased traffic we see on roads like

01:54:42.360 --> 01:54:47.200
 Hobson Road and Ryan there's people trying to get north to ultimately go

01:54:47.200 --> 01:54:53.440
 south whether it's 377 or 35 W or 35 E as Hickory Creek becomes a true

01:54:53.440 --> 01:54:57.720
 connection and not just a jump to a roadway and then skip to another roadway

01:54:57.720 --> 01:55:01.880
 if it's a true connection that would ends up happening at that point is the

01:55:01.880 --> 01:55:08.400
 demand to the north comes south as people try to get to 35 W or 35 E so

01:55:08.400 --> 01:55:12.840
 that's where our projections came from as we were looking through where does

01:55:12.840 --> 01:55:18.760
 this roadway go again it still follows the 2015 mobility plan now all that

01:55:18.760 --> 01:55:24.320
 being said we are not designing this in a vacuum we were given design dollars

01:55:24.320 --> 01:55:30.160
 earlier this year after the fatality accident that occurred on Hickory Creek

01:55:30.160 --> 01:55:35.020
 Road down in this area city council gave us three million dollars to look at

01:55:35.020 --> 01:55:40.240
 alternatives and one of the keys that we went to is as we start talking to our

01:55:40.240 --> 01:55:47.720
 local partners whether it's the county the state city of Argyle also the

01:55:47.720 --> 01:55:51.520
 Council of Governments we're looking for alternative funding sort of sources so

01:55:51.520 --> 01:55:56.600
 that we can start planning this roadway and putting it in place so the 30 is a

01:55:56.600 --> 01:56:02.760
 34 35 34 million dollars that we are talking about as part of our bond

01:56:02.760 --> 01:56:07.120
 program leverages it's our match so to get those other dollars the city has to

01:56:07.120 --> 01:56:12.320
 put in some amount of money to leverage those dollars further so that 34 million

01:56:12.320 --> 01:56:19.480
 is our piece of that ultimate 160 million dollar project so what 36 million

01:56:19.480 --> 01:56:24.360
 say those things don't pan out say we don't get the funding for some reason

01:56:24.360 --> 01:56:29.320
 then what that does do with that 36 million dollars is it builds one bridge

01:56:29.320 --> 01:56:34.480
 of ultimately two bridges so there would be two three lane bridges that would go

01:56:34.480 --> 01:56:39.080
 over the floodplain that builds one of them so instead of having two parallel I

01:56:39.080 --> 01:56:43.960
 would just build one and then we'd put a three lane roadway in that covers the

01:56:43.960 --> 01:56:49.120
 cost of a three lane roadway with no help that's a right away that's the

01:56:49.120 --> 01:56:53.240
 infrastructure to support it that takes care of everything to get us over to

01:56:53.240 --> 01:56:57.680
 1830 from River Pass it also goes over the railroad tracks so you don't have

01:56:57.680 --> 01:57:03.720
 the concern of vehicles pedestrians cars intersecting a train as it goes through

01:57:03.720 --> 01:57:07.640
 it separates the two and takes us up over the railroad tracks and then

01:57:07.640 --> 01:57:13.100
 continues across the floodplain over to 1830 so it takes those fatality chances

01:57:13.100 --> 01:57:20.240
 almost to a negligible point then as we continue to go west what we're cognizant

01:57:20.240 --> 01:57:23.840
 of is one of the things we talked about earlier is development is coming in this

01:57:23.840 --> 01:57:27.440
 area so there's a significant amount of development that has submitted for

01:57:27.440 --> 01:57:31.360
 application is currently under construction or we've already had

01:57:31.360 --> 01:57:36.320
 multiple conversations with developers who own parcels or properties out that

01:57:36.320 --> 01:57:41.920
 way that are building that does not mean that we're just gonna go put in a six

01:57:41.920 --> 01:57:47.040
 lane roadway for the fun of putting a six lane roadway in our charge has been

01:57:47.040 --> 01:57:51.640
 to dot design this in the most context-sensitive way as possible we do

01:57:51.640 --> 01:57:54.800
 that with every street we're doing and that means we take into account what is

01:57:54.800 --> 01:58:00.680
 the setting is it more rural in nature is it more residential in nature is it

01:58:00.680 --> 01:58:05.120
 more of a commercial industrial district each of those has a very different feel

01:58:05.120 --> 01:58:08.760
 a very different amount of transportation in different modes so a

01:58:08.760 --> 01:58:14.200
 lot of pedestrians cyclists vehicles in a much more neighborhood type setting

01:58:14.200 --> 01:58:17.600
 versus an industrial sector where I have a lot of public transit that brings

01:58:17.600 --> 01:58:21.880
 workers to work so my sidewalks are there just to get you from the bus stop

01:58:21.880 --> 01:58:26.360
 essentially to get you to where you're working and then a lot of room for big

01:58:26.360 --> 01:58:30.320
 trucks to drive through so a heavier duty pavement wider areas so that a truck

01:58:30.320 --> 01:58:34.120
 can move back and forth as it needs to be so as we look at Hickory Creek Road

01:58:34.120 --> 01:58:39.000
 and we look at its ultimate design going forward we are going to be very

01:58:39.000 --> 01:58:44.120
 interested in what areas of this roadway might need to be a little narrower

01:58:44.120 --> 01:58:48.360
 because they are in that rural area they're in an area that the potential

01:58:48.360 --> 01:58:51.800
 for growth may be less than in other areas where we've got a lot of homes

01:58:51.800 --> 01:58:56.840
 coming in right on top of each other so those areas there's absolutely room for

01:58:56.840 --> 01:59:03.240
 a narrower roadway for not having to have as much right-of-way taken and I'm

01:59:03.240 --> 01:59:09.040
 thinking exactly of the Brush Creek area when you start getting into that

01:59:09.040 --> 01:59:14.680
 area there is room for both to coexist our current traffic demand model for

01:59:14.680 --> 01:59:19.180
 this area the revised model when we looked at Hickory Creek and would be

01:59:19.180 --> 01:59:26.440
 incorporated into the ultimate mobility plan update looks at this area as being

01:59:26.440 --> 01:59:31.680
 my you can help me out where I start to falter with words there pretend because

01:59:31.680 --> 01:59:37.760
 he's the traffic guru we're looking at that area as it's rural I don't know

01:59:37.760 --> 01:59:40.880
 you've got one acre homes there established homes you're absolutely

01:59:40.880 --> 01:59:45.320
 right we don't want to come through that area and just cut a wide swath of right

01:59:45.320 --> 01:59:50.000
 away through there that we're not going to need for 40 years our study goes out

01:59:50.000 --> 01:59:54.960
 to 2040 and even at 2040 we're not seeing a projected need for anything

01:59:54.960 --> 02:00:00.260
 beyond four lanes so much further into the distant future that might be an

02:00:00.260 --> 02:00:04.840
 occurrence where you'd need six so what we would typically do on roadways where

02:00:04.840 --> 02:00:08.580
 we've already said at some point you will need the six lanes maybe it's 40

02:00:08.580 --> 02:00:13.200
 years 50 years out we would get the right away width for six lanes

02:00:13.200 --> 02:00:17.040
 especially if we have a lot of commercial development a lot of heavy

02:00:17.040 --> 02:00:20.400
 small residential coming in the area where you're gonna have a lot of traffic

02:00:20.400 --> 02:00:24.640
 I mean in these six lanes a lot faster so what I might do is build the roadway

02:00:24.640 --> 02:00:29.200
 where I've built my two outside lanes and that very wide median so I could

02:00:29.200 --> 02:00:34.960
 impact traffic less when I do have to build those into inside two lanes what I

02:00:34.960 --> 02:00:39.280
 may be able to do in other areas and this is why a lot of letters have been

02:00:39.280 --> 02:00:43.320
 have gone out about the city wanting to come and talk to property owners about

02:00:43.320 --> 02:00:47.920
 property and where the roadway would align is we haven't nailed down to the

02:00:47.920 --> 02:00:52.920
 nth degree where's the center line of that road going to go over the next year

02:00:52.920 --> 02:00:58.040
 there is a lot of conversation we had with property owners about the impacts

02:00:58.040 --> 02:01:01.720
 to them the impacts to where that right away would go where the road would go

02:01:01.720 --> 02:01:05.240
 we're doing an environmental analysis on the entire stretch of the roadway

02:01:05.240 --> 02:01:10.120
 including the warrants of a sound wall so we're looking at all those impacts and

02:01:10.120 --> 02:01:16.840
 how that would impact the overall design this is an evolving process and when

02:01:16.840 --> 02:01:21.440
 we've gone out and done the survey work today what we've done is just simply

02:01:21.440 --> 02:01:25.280
 gathered the upfront information so we can start having the conversation with

02:01:25.280 --> 02:01:33.360
 folks about where we go what challenges are ahead of us long term even in 2015

02:01:33.360 --> 02:01:36.920
 but going forward we still see the need for that roadway to be a prime

02:01:36.920 --> 02:01:42.480
 connection to 35w if we miss too many more chances like we've missed on East

02:01:42.480 --> 02:01:46.080
 Denton on the east side of Denton where Mayhills going in where loop 28 is a

02:01:46.080 --> 02:01:52.400
 bottleneck if we miss too many more chances anywhere then we will have a

02:01:52.400 --> 02:01:56.580
 locked-up navigate a transportation system across the board and we'll be

02:01:56.580 --> 02:02:02.800
 fighting the same scenario of gridlock and places where it's very difficult to

02:02:02.800 --> 02:02:06.160
 get around you got a lot of signals where you're just stopped at so you know

02:02:06.160 --> 02:02:10.920
 I'm not a traffic engineer by trade I've learned a lot over the last 10 years of

02:02:10.920 --> 02:02:14.360
 how to become a traffic engineer I'm a stormwater engineer so I hear the

02:02:14.360 --> 02:02:18.480
 concerns about floodplain and I immediately go there every time we start

02:02:18.480 --> 02:02:24.400
 one of these projects but what I do know is that when I look at these projects

02:02:24.400 --> 02:02:27.880
 we've got to start planning for the future we have to draw that line

02:02:27.880 --> 02:02:33.360
 somewhere from staffs recommendation this is the alignment that makes sense

02:02:33.360 --> 02:02:39.480
 it doesn't mean that we bolted it down that it's not going to vary we absolutely

02:02:39.480 --> 02:02:42.840
 are sensitive to the context of where we're going to be in this area so there

02:02:42.840 --> 02:02:46.040
 is a lot of conversation to be had between now and when this project were

02:02:46.040 --> 02:02:50.280
 to actually go forward if this group chooses to keep this project on the bond

02:02:50.280 --> 02:03:02.680
 list how much of that Hickory Creek are you asking us to recommend in this bond

02:03:02.680 --> 02:03:09.960
 package all the way over to 377 the 34 million dollars would if no other

02:03:09.960 --> 02:03:14.840
 financial partner came in would construct from River Pass to 1830 it

02:03:14.840 --> 02:03:22.920
 would also get the design all the way over to 35 W now if our partners agree

02:03:22.920 --> 02:03:27.040
 to continue down this pathway with us we could go to construction much faster than

02:03:27.040 --> 02:03:35.920
 the entire length could you put up a map and show us where the outer loop is

02:03:35.920 --> 02:03:44.440
 projected to come out or loop 288 huh outer loop or loop 288 well loop to it

02:03:44.440 --> 02:03:57.920
 okay alright it's taking a minute to reset but loop 288 on the west side

02:03:57.920 --> 02:04:05.840
 comes down into 24 9 24 49 and then over to 35 W here at vintage and then it

02:04:05.840 --> 02:04:12.240
 would have said four cents of direct connect that basically peel off the six

02:04:12.240 --> 02:04:15.480
 lanes that would be out here to just four lanes coming across the bridge to

02:04:15.480 --> 02:04:19.080
 vintage and those we call them direct next their flyovers or you've seen a

02:04:19.080 --> 02:04:23.960
 word on I 35 and dollars for worth we get in a lane and you fly over a ramp

02:04:23.960 --> 02:04:28.360
 and down tie directly into the intersection or to the interstate okay I

02:04:28.360 --> 02:04:35.240
 have we've been told and heard for some years that vintage was projected to be

02:04:35.240 --> 02:04:42.560
 six lanes in the 20 I'd have to go back and look at the mobility plan shows for

02:04:42.560 --> 02:04:46.080
 2015 I know that our current area study shows nothing more than four lanes

02:04:46.080 --> 02:04:52.760
 divided and I think the 2015 shows that it's a four lane divided roadway that's

02:04:52.760 --> 02:04:57.200
 what the funding was set up for actually look at different propositions and

02:04:57.200 --> 02:05:02.360
 agreements it was all for a four lane divided roadway which it is great well

02:05:02.360 --> 02:05:06.360
 it's it's a three it's a two lane divided roadway and then we're going to

02:05:06.360 --> 02:05:12.600
 build here later this year the outside two lanes so if 288 is going to come

02:05:12.600 --> 02:05:20.080
 around and hook up with vintage doesn't it make sense for that to continue all

02:05:20.080 --> 02:05:30.080
 the way over to Taysley the either Ryan or Hickory Cree you have a lot of

02:05:30.080 --> 02:05:35.920
 disadvantages and one would just be could you do it sure there anything is

02:05:35.920 --> 02:05:42.600
 possible 100% the reality is as soon as you bring vintage over to tie into Ryan

02:05:42.600 --> 02:05:48.080
 you have the intersection of two rail crossings so at this rail crossing we

02:05:48.080 --> 02:05:52.760
 would have to go over one and leave one at grade so there's a potential safety

02:05:52.760 --> 02:05:58.040
 issue there I would not want to have a signalized intersection right next to

02:05:58.040 --> 02:06:01.560
 two railways because you have to do what we call preemption which is I got to

02:06:01.560 --> 02:06:05.720
 allow some cars to pass when the trains come in now I've got two legs that have

02:06:05.720 --> 02:06:10.280
 to do that the exact same time opposing each other and that's a scary scenario

02:06:10.280 --> 02:06:14.200
 anyway you look at it so one would have to go over the other so we would either

02:06:14.200 --> 02:06:18.520
 need to pull Ryan further to the north and get it away from that intersection

02:06:18.520 --> 02:06:22.840
 so they had plenty of room so we'd be cutting through this area and then going

02:06:22.840 --> 02:06:27.800
 across to Ryan or we'd need to elevate which would mean we'd have to drop

02:06:27.800 --> 02:06:32.680
 lanes on both sides probably starting right back over in this area maybe even

02:06:32.680 --> 02:06:35.680
 a little closer to the school you got to start and drop a lane on both sides

02:06:35.680 --> 02:06:38.800
 essentially a frontage road to the bridge it would ultimately go over and

02:06:38.800 --> 02:06:41.840
 then depending on how wide you make it you would have to make it four lanes

02:06:41.840 --> 02:06:47.640
 divided all the way down Ryan because of the incoming traffic over to 2181 so

02:06:47.640 --> 02:06:51.520
 Hickory Creek does a couple of things for us that Ryan doesn't do Ryan's

02:06:51.520 --> 02:06:58.320
 disjointed when it gets over to 2181 so it stops at 2181 it causes another

02:06:58.320 --> 02:07:03.320
 problem so if you add additional traffic onto Ryan by bringing them off the

02:07:03.320 --> 02:07:07.800
 interstate then now I've got additional potential traffic over here all the way

02:07:07.800 --> 02:07:12.240
 on to 2181 that's trying to get to Robinson or wherever else they're trying

02:07:12.240 --> 02:07:16.240
 to go they're making a lot of decisions at that point Hickory Creek does allow

02:07:16.240 --> 02:07:22.240
 you to get all the way over to 2499 at one time all from 35 W all the way

02:07:22.240 --> 02:07:28.480
 across so from a traffic perspective from a transportation perspective it

02:07:28.480 --> 02:07:33.460
 makes the most sense for getting people around from my perspective but again

02:07:33.460 --> 02:07:37.120
 that's just the purview of this committee is to make that choice in that

02:07:37.120 --> 02:07:42.840
 recommendation of where this goes of course if you went to Ryan even though

02:07:42.840 --> 02:07:51.280
 it didn't wouldn't go on over to 24 to 2181 you would have fewer lane miles to

02:07:51.280 --> 02:07:57.760
 have to build with that offset some cost of elevation it could potentially I'd

02:07:57.760 --> 02:08:01.640
 have to run further numbers on that one but you have a longer bridge crossing to

02:08:01.640 --> 02:08:05.880
 get over the floodplain plus we would have to go back and re-evaluate the

02:08:05.880 --> 02:08:10.240
 ultimate configuration of vintage back to that six lane and it has cost

02:08:10.240 --> 02:08:14.960
 implications at that point as well so as far as the actual number I can get you a

02:08:14.960 --> 02:08:18.040
 budget number on that to let you know what that would look like cost from a

02:08:18.040 --> 02:08:22.600
 cost difference standpoint another proposal was to take Hickory Creek over

02:08:22.600 --> 02:08:27.600
 to 1830 and then skirt the floodplain a lot of that floodplain is in a floodway

02:08:27.600 --> 02:08:31.160
 so the Stark area is in the floodway I cannot get into that area unless I'm

02:08:31.160 --> 02:08:36.760
 going to go over it then in the floodplain to make it a true regional

02:08:36.760 --> 02:08:39.880
 connector I've got to elevate the whole roadway out of the hundred-year floodplain

02:08:39.880 --> 02:08:43.240
 so I'm going to be bringing a lot of dirt there's a lot of potential impacts

02:08:43.240 --> 02:08:48.080
 to the floodplain upstream and downstream that could result in further construction

02:08:48.080 --> 02:08:52.640
 just to bring that roadway over another reason why Hickory Creek we were

02:08:52.640 --> 02:08:57.920
 looking to just span the floodplain one time and then we would still need to

02:08:57.920 --> 02:09:01.440
 build the drainage infrastructure to handle the hundred-year flood all the

02:09:01.440 --> 02:09:05.120
 way down brush Creek and all red which would be done with that project and as

02:09:05.120 --> 02:09:09.560
 part of the current design but those are some of the things that can be addressed

02:09:09.560 --> 02:09:15.160
 much more quickly and cost-effectively than trying to skirt the floodplain well

02:09:15.160 --> 02:09:20.680
 it seems like we're not going to solve this today but and there's still going

02:09:20.680 --> 02:09:26.360
 to be a lot of conversation about it yes and of course I would like to see us

02:09:26.360 --> 02:09:36.360
 not impact homes impossible so there's there's but let's let's speak for a

02:09:36.360 --> 02:09:42.080
 moment about the public safety question and the desk that occurred there that's

02:09:42.080 --> 02:09:48.760
 what could be addressed by building the bridge is that right yes and and that

02:09:48.760 --> 02:09:52.640
 was one of the drivers are going straight there was its cost it gets us

02:09:52.640 --> 02:09:56.800
 over the floodplain quicker but it eliminates the potential for those types

02:09:56.800 --> 02:10:01.080
 of fatalities and accidents that have occurred over the last 20 to 30 years at

02:10:01.080 --> 02:10:06.600
 a minimum so we know well we haven't we haven't tried out the guardrail which is

02:10:06.600 --> 02:10:13.240
 now up and I would hope nobody wouldn't that be a factor to help deter it

02:10:13.240 --> 02:10:17.720
 definitely helps kinds of accidents that have been fatality accidents so we're

02:10:17.720 --> 02:10:22.240
 talking about switching the focus to Ryan off of Hickory Creek in terms of

02:10:22.240 --> 02:10:27.760
 matching dollars that we could get from outside sources what type of an impact

02:10:27.760 --> 02:10:32.200
 would it have on you know Ryan versus Hickory I mean are we able to leverage

02:10:32.200 --> 02:10:37.160
 Hickory Creek more so than we are Ryan yes you do get much more leverage

02:10:37.160 --> 02:10:40.880
 capacity out of it because this roadways we've already identified in the mobility

02:10:40.880 --> 02:10:45.520
 plan that are now eligible for that help in funding long term whereas with Ryan

02:10:45.520 --> 02:10:49.520
 we're basically fitting the bill for the vast majority of it but this area through

02:10:49.520 --> 02:11:00.400
 here yes ma'am I know currently there are no streetlights all along Hickory Creek

02:11:00.400 --> 02:11:06.840
 would lighting be part of yes this package this would be bicycle lanes

02:11:06.840 --> 02:11:10.560
 would be bicycle trail it wouldn't be on the lanes it'd be separated from the

02:11:10.560 --> 02:11:14.760
 roadway bicycle trail on both sides would be sidewalks tied into the parks

02:11:14.760 --> 02:11:20.160
 network trail system it'd be streetlights and then it'd be of course

02:11:20.160 --> 02:11:23.680
 signals or whatever other intersection controls might be needed throughout the

02:11:23.680 --> 02:11:35.560
 entire corridor could you show us where Brush Creek ties into so Brush Creek

02:11:35.560 --> 02:11:41.000
 ties in right here so if you look at where we're going currently we're

02:11:41.000 --> 02:11:44.640
 talking about taking Hickory Creek over so the current Hickory Creek alignment

02:11:44.640 --> 02:11:50.280
 if you've driven it has a very sharp incline it's also a place where we have

02:11:50.280 --> 02:11:55.200
 other accidents occur at that intersection because it's hard to get up

02:11:55.200 --> 02:11:58.840
 it's difficult to get up that incline and you've got a lot of commuter traffic

02:11:58.840 --> 02:12:03.680
 that's going north and south on 1830 as people are commuting back and forth so

02:12:03.680 --> 02:12:07.200
 this would take it straight across the floodplain over the railroad tracks

02:12:07.200 --> 02:12:12.000
 eliminate multiple safety concerns and then bring it across now what we're

02:12:12.000 --> 02:12:17.240
 working with TxDOT on is if this is the alignment that stays then we would be

02:12:17.240 --> 02:12:21.880
 working with them on where does 1830 tie into this so they have money available

02:12:21.880 --> 02:12:27.760
 right now to improve 1830 all the way down to 407 what they're what they're

02:12:27.760 --> 02:12:30.760
 looking to do right now just because Argyle is really not interested in

02:12:30.760 --> 02:12:34.920
 utilizing those dollars they are very interested in what do we want to do with

02:12:34.920 --> 02:12:40.920
 1830 from Hickory Creek North so it's that four lane divided roadway six lane

02:12:40.920 --> 02:12:43.840
 divided where are we going with that roadway and that's the conversation

02:12:43.840 --> 02:12:47.020
 we're having with them that absolutely impacts this intersection the other

02:12:47.020 --> 02:12:52.160
 concern at this intersection even when Country Club Road was redone there is a

02:12:52.160 --> 02:12:56.000
 steep curve as you go around almost looks like a NASCAR racetrack right and

02:12:56.000 --> 02:13:01.960
 that's to keep those 55 mile an hour traffic on the road the problem is is

02:13:01.960 --> 02:13:06.000
 that's not a good transition to Country Club if you're trying to get to 35 W

02:13:06.000 --> 02:13:09.620
 unless you really slow down now they have tried to put a right turn lane to

02:13:09.620 --> 02:13:13.340
 pull off and that does help because you got to slow down and get out of traffic

02:13:13.340 --> 02:13:16.720
 and get over but you're still going up and over and then if you're coming up

02:13:16.720 --> 02:13:22.640
 Crawford so you're coming this way up Country Club Road from Crawford then

02:13:22.640 --> 02:13:27.000
 you've got to go up and over the crest of that embankment to get left or right

02:13:27.000 --> 02:13:30.440
 makes it very difficult to see who's coming and going because there are

02:13:30.440 --> 02:13:36.480
 significant declines in the roadway going both directions so one of the

02:13:36.480 --> 02:13:39.880
 things that we have been talking about is with this alignment we've been

02:13:39.880 --> 02:13:45.480
 working with the city of Argyle and the I guess town of Argyle and the county

02:13:45.480 --> 02:13:50.040
 along with Gog is potentially realigning Country Club Road to where it would tee

02:13:50.040 --> 02:13:57.280
 into the Hickory Creek Road when we push this and make it a much safer scenario

02:13:57.280 --> 02:14:01.640
 so you've got a lot of drivers here that we're also trying to resolve some

02:14:01.640 --> 02:14:11.840
 current existing issues with this one project okay so repeat your answer what

02:14:11.840 --> 02:14:19.720
 you're asking the rest to do is recommend the extension of Hickory

02:14:19.720 --> 02:14:30.240
 Creek across straightening it out to 1830 and then the rest of that would be a

02:14:30.240 --> 02:14:37.360
 steady if our if our partners our funding partners for whatever reason

02:14:37.360 --> 02:14:40.980
 didn't and that's not the inclination we've heard from any of them as we go

02:14:40.980 --> 02:14:47.040
 forward to the election we would be getting that noted and documented

02:14:47.040 --> 02:14:51.360
 in a way that people understand that is a reality if that were to just not

02:14:51.360 --> 02:14:57.200
 happen then yes the project would carry three lanes of roadway over to 1830 and

02:14:57.200 --> 02:15:01.180
 build two three-lane bridges one three-lane bridge over the railroad

02:15:01.180 --> 02:15:05.480
 tracks and one over over the floodplain and then the other bridges would have to

02:15:05.480 --> 02:15:12.400
 come in at a later date when it gets expanded I believe one of the gentleman

02:15:12.400 --> 02:15:18.920
 asked about phases and when the timing and anticipated completion can you dress

02:15:18.920 --> 02:15:24.640
 that so the phases so much depend on when those funding partners come to the

02:15:24.640 --> 02:15:31.520
 table so if we continue down this path and our partners do commit what they're

02:15:31.520 --> 02:15:35.760
 just in verbal discussion and in meetings there they seem like they're

02:15:35.760 --> 02:15:40.840
 going to commit to if they commit to that then we could begin phasing this

02:15:40.840 --> 02:15:47.720
 entire project in a five to six year span all the way over to 35 W it could

02:15:47.720 --> 02:15:53.440
 be accomplished in that time frame now if they don't come forward for whatever

02:15:53.440 --> 02:16:00.200
 reason then we still would be able to get to 1830 over the next three years

02:16:00.200 --> 02:16:10.720
 we as a city do not are not committed to six lines on Bruce Creek Road no right

02:16:10.720 --> 02:16:16.160
 no the only part that we're building provision for a six lane facility is on

02:16:16.160 --> 02:16:20.600
 the bridges knowing that at some point in the distant future six lanes most

02:16:20.600 --> 02:16:25.160
 likely is required it's beyond 2040 timeframe which is why we're not

02:16:25.160 --> 02:16:29.880
 recommending that they get built the entire length but the bridges absolutely

02:16:29.880 --> 02:16:33.880
 need to be built to six lanes there is a very small piece between the two bridges

02:16:33.880 --> 02:16:37.440
 between the railroad crossing and the floodplain crossing where it touches

02:16:37.440 --> 02:16:42.040
 down just briefly and that area it's actually right in here that area right

02:16:42.040 --> 02:16:46.880
 there we would build six lanes a roadway which stripe it for four but we built

02:16:46.880 --> 02:16:50.120
 six lanes because it ties into both bridges that make any sense to make you

02:16:50.120 --> 02:16:58.360
 whip over and then went back where the city limits in terms of Brush Creek so

02:16:58.360 --> 02:17:03.480
 it's not all in Denton no not currently so it follows along the center line of

02:17:03.480 --> 02:17:07.520
 Brush Creek Road all the way to just past the hills of Argyle and then comes

02:17:07.520 --> 02:17:14.160
 up to the north and down and then back over so the gray is Argyle and the

02:17:14.160 --> 02:17:19.360
 yellowish is Denton unnecessarily most of the time the gray is it's

02:17:19.360 --> 02:17:27.160
 unincorporated so it's in our EJJ technically it's still in the county

02:17:27.160 --> 02:17:38.080
 guess I'm gonna advocate for the people that live on Bushy or so when are you

02:17:38.080 --> 02:17:44.200
 guys gonna help out with the flooding too because there's issues now I'm sure

02:17:44.200 --> 02:17:48.240
 you've gotten complaints already when are you guys gonna start addressing those

02:17:48.240 --> 02:17:52.160
 issues that this project would address those issues because those all get

02:17:52.160 --> 02:17:56.480
 resolved with draft with the actual roadway project so that's part of the

02:17:56.480 --> 02:18:00.080
 hundred sixty million dollar project is we'd be resolving all the floodplain

02:18:00.080 --> 02:18:04.040
 issues that we would come across out there as well without that we don't

02:18:04.040 --> 02:18:08.440
 currently have a time frame because the funding is not there at the moment for

02:18:08.440 --> 02:18:13.840
 those drainage scenarios so that would be the proposition that we want voters

02:18:13.840 --> 02:18:22.520
 to vote on okay this is what they would be voting towards I'm sorry do we as a

02:18:22.520 --> 02:18:27.360
 city if we're gonna lobby for that hundred and sixty million dollars and

02:18:27.360 --> 02:18:35.560
 get it do we have a say so in how wide the street is or the road is on brush

02:18:35.560 --> 02:18:40.120
 creek yes absolutely and that's part of now we're getting most of the money from

02:18:40.120 --> 02:18:47.160
 I mean but it's it's the city's decision and so the funding sources we're going

02:18:47.160 --> 02:18:50.840
 to it's not like what happened in Fort Worth about five years ago you saw it on

02:18:50.840 --> 02:18:56.400
 the news Rosedale was built to six lanes it was federally funded the federal

02:18:56.400 --> 02:18:59.600
 government said if we're gonna build it and we're gonna fund it it's gonna be

02:18:59.600 --> 02:19:07.240
 six lanes city of Fort Worth said okay but then right afterwards their traffic

02:19:07.240 --> 02:19:10.760
 model showed they didn't need six lanes they could not convince the state or

02:19:10.760 --> 02:19:14.120
 federal government that they didn't need six lanes so to get the money for the

02:19:14.120 --> 02:19:18.200
 taxpayers they built six lanes and then they immediately put the roadway on a

02:19:18.200 --> 02:19:23.080
 road diet so they built a lot of parking on street they put landscape islands

02:19:23.080 --> 02:19:27.160
 once it was turned over to the city so that is not this scenario we haven't

02:19:27.160 --> 02:19:31.480
 gone into this discussion with anybody in in that similar vein it has been

02:19:31.480 --> 02:19:36.120
 purely what the results of our traffic study has shown the entire we looked at

02:19:36.120 --> 02:19:42.080
 the entire area and that area study shows that we for the next 20 years plus

02:19:42.080 --> 02:19:48.360
 we don't need anything more than four lanes now you get beyond that that's why

02:19:48.360 --> 02:19:52.680
 we redo these studies they do them redo the mobility plan and updated every four

02:19:52.680 --> 02:19:58.200
 to five years is development and traffic patterns change over time so every four

02:19:58.200 --> 02:20:01.880
 to five years we revisit these studies so that we can see what's really happening

02:20:01.880 --> 02:20:05.800
 it could be that five years from now we need to add the other two lanes because

02:20:05.800 --> 02:20:09.920
 there's that much traffic demand out there I don't know right now our current

02:20:09.920 --> 02:20:15.480
 projections is that we only need four for the question specifically about this

02:20:15.480 --> 02:20:24.040
 project yeah I have some thoughts I I have no doubt in our city staff that

02:20:24.040 --> 02:20:29.320
 they're able to figure out where and how best to plan a regional connector in this

02:20:29.320 --> 02:20:33.880
 region and work through all the floodplain issues I think they do an

02:20:33.880 --> 02:20:39.680
 astounding job most of my concerns are more just whether or not the the

02:20:39.680 --> 02:20:45.280
 residents of our town actually want a regional connector in this region would

02:20:45.280 --> 02:20:52.080
 I don't know if you can pull up the current future land use map I don't know

02:20:52.080 --> 02:20:59.080
 if it's on the public GIS or not but it it's on the website if it's not there

02:21:00.040 --> 02:21:07.240
 as you look for that I'll just start to say some things so so first of all thank

02:21:07.240 --> 02:21:10.680
 you for bringing up the the recent safety issues I think that that's

02:21:10.680 --> 02:21:17.640
 important to keep in mind you know with recent community comments and I think

02:21:17.640 --> 02:21:21.440
 one person on the committee last week mentioned the Denton 2030 plan so I

02:21:21.440 --> 02:21:27.600
 actually went home and read it it's it's only 415 pages so but I won't read the

02:21:27.600 --> 02:21:33.520
 whole thing to you but I have pulled up several quotes from it that I think are

02:21:33.520 --> 02:21:39.760
 help for people who maybe weren't present through that process orient them

02:21:39.760 --> 02:21:48.040
 to what the current long-range plan of the city says so I'll summarize some of

02:21:48.040 --> 02:21:51.320
 this and then I'll get into some of the details but basically the plan went

02:21:51.320 --> 02:21:57.920
 through a variety of different thank you so so I think right here you can kind of

02:21:57.920 --> 02:22:02.880
 see the the city limits down there where we were talking at the sort of the

02:22:02.880 --> 02:22:10.600
 intersection between the ETJ green area and the city limits so my understanding

02:22:10.600 --> 02:22:17.020
 is that that entire green section is earmarked as a rural area right which

02:22:17.020 --> 02:22:22.760
 with our zoning would typically be agricultural use or homes on five acre

02:22:22.760 --> 02:22:31.560
 or larger lots so anyway so the the the 2030 plan they presented several

02:22:31.560 --> 02:22:38.840
 different growth scenarios so I said the starting point for the development of

02:22:38.840 --> 02:22:43.320
 land use concepts was the depiction of the growth trend scenario the likely

02:22:43.320 --> 02:22:48.240
 pattern of growth and development in 15 to 20 years if there were no changes in

02:22:48.240 --> 02:22:52.920
 policy to alter present trends the preferred growth concept was developed

02:22:52.920 --> 02:22:58.160
 to present a conceptual vision for the form character and general location of

02:22:58.160 --> 02:23:02.800
 development for Denton that reflected the input and expressed preferences of

02:23:02.800 --> 02:23:07.240
 the community the general location of the new development and areas for

02:23:07.240 --> 02:23:11.400
 intensification was the basis for the development of the future land use map

02:23:11.400 --> 02:23:17.280
 and then through that process the the growth trend scenario which was sort of

02:23:17.280 --> 02:23:22.680
 the business as usual more stuff got about twelve percent of the community

02:23:22.680 --> 02:23:31.360
 votes it was the lowest one and then so then on land use policy it goes on it

02:23:31.360 --> 02:23:37.960
 says the availability of rural that's getting tongue twisters here rural raw

02:23:37.960 --> 02:23:42.480
 land coupled with an incumbent an accommodating development approval

02:23:42.480 --> 02:23:48.720
 process has facilitated development in Denton that outwardly expanded the

02:23:48.720 --> 02:23:53.360
 suburban fringe at a relatively low density and intensity this trend has

02:23:53.360 --> 02:23:58.240
 resulted in a land use pattern that has tended to further extend distances

02:23:58.240 --> 02:24:04.600
 between people between where people live work and shop resulting in a rate of land

02:24:04.600 --> 02:24:09.880
 consumption and spreading out which is faster than the underlying growth of the

02:24:09.880 --> 02:24:15.240
 population producing an unsustainable trend that is costly for the city and

02:24:15.240 --> 02:24:19.560
 taxpayers alike the consequences of this spreading out trend has been

02:24:19.560 --> 02:24:24.880
 experienced in longer auto trip lengths greater levels of congestion strained

02:24:24.880 --> 02:24:29.160
 environmental and fiscal resources and challenges for public services and

02:24:29.160 --> 02:24:34.120
 facilities to keep up with the demands of this rapidly enlarging development

02:24:34.120 --> 02:24:40.360
 footprint it goes on to talk about some suggested changes and tempering of the

02:24:40.360 --> 02:24:45.920
 current city's annexation plan in light of that then it has some things to say

02:24:45.920 --> 02:24:51.820
 about infrastructure infrastructure planning says another important citywide

02:24:51.820 --> 02:24:55.920
 land use consideration is to foster greater coordination between land use

02:24:55.920 --> 02:25:01.120
 policies and policies for mobility and infrastructure Denton plan 2030 should

02:25:01.120 --> 02:25:05.920
 become the key policy document to which future revisions of all plans and

02:25:05.920 --> 02:25:12.000
 programs like a bond among all city department plans and policies should be

02:25:12.000 --> 02:25:16.760
 revised for consistency to ensure coordination of land use mobility and

02:25:16.760 --> 02:25:27.960
 infrastructure planning so and then it goes on says the preferred growth

02:25:27.960 --> 02:25:32.400
 concept seeks to use areas of Denton with the infrastructure capacity to

02:25:32.400 --> 02:25:36.480
 absorb additional development to support increased density potentially creating a

02:25:36.480 --> 02:25:41.320
 more fiscally balanced or profitable land use mixture given the revenue

02:25:41.320 --> 02:25:46.160
 structure and capital demands of land uses in the city the best means to

02:25:46.160 --> 02:25:50.680
 maintain fiscal sustainability is to diversify and intensify the developed

02:25:50.680 --> 02:25:58.000
 core and at the end it gives some information about how this plan should

02:25:58.000 --> 02:26:08.640
 be looked at in the future and amended if necessary says basically plan

02:26:08.640 --> 02:26:16.520
 amendments are periodic substantive changes to the Denton 2030 plan and its

02:26:16.520 --> 02:26:20.560
 associated goals policies and actions as well as changes to the future land use

02:26:20.560 --> 02:26:26.040
 map which are necessary to accommodate changes for unforeseen circumstances in

02:26:26.040 --> 02:26:30.320
 a manner consistent with the public interest the planning and zoning

02:26:30.320 --> 02:26:34.120
 commission and City Council will accept applications for plan amendments in a

02:26:34.120 --> 02:26:40.200
 biannual basis via staff requests so so that's kind of just some some snippets

02:26:40.200 --> 02:26:50.840
 out of the 2030 plan that I found I think as I look at this the the traffic

02:26:50.840 --> 02:26:57.320
 studies in the regional area as I understand them assume a density of

02:26:57.320 --> 02:27:01.000
 development in this area that is much higher than the current future land use

02:27:01.000 --> 02:27:06.040
 map would that be an accurate statement Todd I'd have to go back and take a look

02:27:06.040 --> 02:27:10.760
 at what we actually went into that off top of my head I don't know what it was

02:27:10.760 --> 02:27:15.340
 referenced in the task of that model was to look at what's currently going in so

02:27:15.340 --> 02:27:19.000
 there have been a lot of zoning cases over several years last several years in

02:27:19.000 --> 02:27:24.240
 applications where density is different so that is the reality of what we as

02:27:24.240 --> 02:27:27.880
 traffic engineers and as transportation engineers are trying to adjust for is

02:27:27.880 --> 02:27:32.760
 that what we may have set out one way in 2015 at both the time the mobility plan

02:27:32.760 --> 02:27:40.680
 and the 2030 vision plan was things change and evolve over time and that's

02:27:40.680 --> 02:27:45.480
 where our struggle is is to make sure that we adjust to what's coming and where

02:27:45.480 --> 02:27:50.040
 we're going yeah so I mean maybe I'm not aware of all of them but most of the

02:27:50.040 --> 02:27:56.840
 plats and and P&Z requests I think have been in sort of the yellow area northeast

02:27:56.840 --> 02:28:01.640
 of the floodplain right that's more accessible to 2181 and that sort of thing

02:28:01.640 --> 02:28:06.560
 so we're saying we haven't had a lot of infill in this area and then we are

02:28:06.560 --> 02:28:12.600
 getting more and more applications in this area okay the nearer to 35 W okay

02:28:12.600 --> 02:28:22.920
 thank you that helps I'll just say that to me this project risks using a an

02:28:22.920 --> 02:28:28.840
 infrastructure project to modify the future land use map and that seems

02:28:28.840 --> 02:28:34.120
 potentially the wrong order I understand that the coordination of those things is

02:28:34.120 --> 02:28:39.520
 very difficult because on the one hand you you don't get to have the public

02:28:39.520 --> 02:28:43.880
 input and debate over what is important for the city do we want to move away

02:28:43.880 --> 02:28:49.000
 from the compact growth that we thought would make us fiscally stronger but on

02:28:49.000 --> 02:28:53.400
 the other hand if growth happens and you don't come in in time to Todd's point

02:28:53.400 --> 02:28:59.840
 you you end up not being able to make the connections because you can't get

02:28:59.840 --> 02:29:07.040
 the right of way right so I I just have a hard time with the chicken and egg

02:29:07.040 --> 02:29:13.400
 thing here because I I see the benefits certainly to this regional connection if

02:29:13.400 --> 02:29:19.020
 this area were to develop at sort of a three units per acre or greater certainly

02:29:19.020 --> 02:29:23.440
 it would be needed but the current plan as I read it says that's not what we

02:29:23.440 --> 02:29:29.840
 want to do so you know I I would just pose to the rest of the committee

02:29:29.840 --> 02:29:36.440
 members you know is it is it wise to propose a project like this when you

02:29:36.440 --> 02:29:42.880
 know the the map not the map but the 2030 plan just five years ago citizens

02:29:42.880 --> 02:29:52.440
 said that's that's not the way we want to grow yeah yeah I think a lot of what

02:29:52.440 --> 02:29:56.440
 you're saying is it's all true it's in the plan I think the difference with the

02:29:56.440 --> 02:30:02.960
 Texas plans or their aspirational many states they're legal and so it's a it's

02:30:02.960 --> 02:30:06.240
 a very real difference you're absolutely right with what's in that plan the fact

02:30:06.240 --> 02:30:10.000
 of the matter is and the reason this is being brought to you is even though we'd

02:30:10.000 --> 02:30:14.520
 like you know that plan you know wanted to see more intense growth infill that

02:30:14.520 --> 02:30:18.800
 sort of thing for all the reasons you articulated we are actually having

02:30:18.800 --> 02:30:23.520
 planning and development meetings almost on a monthly basis we're watching the

02:30:23.520 --> 02:30:29.800
 these smaller more dense are forward our six subdivisions wanting to come in an

02:30:29.800 --> 02:30:37.100
 infill between 35 and 377 so really the question is this for the same dollars we

02:30:37.100 --> 02:30:40.640
 can either solve a safety problem we've had people you know killed out there in

02:30:40.640 --> 02:30:44.720
 the last few years and in terms of the guardrail that guardrail gets hit so

02:30:44.720 --> 02:30:50.600
 often you know I live over that area and it's tore out constantly and I think the

02:30:50.600 --> 02:30:55.520
 question really is is that the solution long term if the committee if the

02:30:55.520 --> 02:30:58.480
 committee basically said it's gonna cost you the same money to either do the

02:30:58.480 --> 02:31:03.600
 interconnection or just go to 2181 there's not really a right answer the

02:31:03.600 --> 02:31:08.640
 only reason this project was brought forward is it there's no question in the

02:31:08.640 --> 02:31:11.940
 next five to ten years those opportunities are gone for the

02:31:11.940 --> 02:31:15.400
 regional connection because there's gonna be so many platted homes the city

02:31:15.400 --> 02:31:18.640
 would never be able to afford to go in and condemn the right away again and

02:31:18.640 --> 02:31:23.240
 we're having to provide answers to development community right now where

02:31:23.240 --> 02:31:26.620
 that where that alignment might go so they know what to dedicate to us in

02:31:26.620 --> 02:31:32.520
 terms of right away so your policy the policy issue is is it's a good analysis

02:31:32.520 --> 02:31:38.280
 of the plan we're seeing we've seen dozens of dozens of properties come in

02:31:38.280 --> 02:31:43.480
 directly contradicting the 2030 plan in my tenure here I've never once seen

02:31:43.480 --> 02:31:47.320
 development turned down because it was out of compliance with that plan so

02:31:47.320 --> 02:32:04.600
 that's interesting so that's one question I would like answered is that

02:32:04.600 --> 02:32:10.860
 specific provision that you read do you know if that was in the revised 2030 or

02:32:10.860 --> 02:32:15.600
 if that was dated predated back to the 1999 version so the way I read it it was

02:32:15.600 --> 02:32:20.760
 not a revision but it was a new plan I mean it referred to the old plan in a

02:32:20.760 --> 02:32:28.240
 couple of key areas actually on page 28 and 29 of the planet yeah it says how to

02:32:28.240 --> 02:32:34.400
 use the plan and what the paragraph that I'm reading is on 20 page 29 says as

02:32:34.400 --> 02:32:37.800
 many policies and actions are reoccurring and reinforced in many of

02:32:37.800 --> 02:32:42.120
 the elements policies and actions that overlap or cross-referenced in parentheses

02:32:42.120 --> 02:32:46.440
 so that implement implementation policies and actions that address

02:32:46.440 --> 02:32:50.920
 multiple goals may be accomplished through a single measure the policies

02:32:50.920 --> 02:32:55.520
 and actions that are being referenced as continuations of the 1999 Denton plan

02:32:55.520 --> 02:33:00.160
 are noted parenthetically citing the page number of the previous Denton plan

02:33:00.160 --> 02:33:09.400
 I or EG DP page 122 this is to reinforce that the Denton plan 2030 is an update

02:33:09.400 --> 02:33:16.480
 of the 1999 Denton plan okay thank you so so it's which theoretically went to

02:33:16.480 --> 02:33:22.320
 2020 yeah and we're not there yet yeah and basically what what was going on

02:33:22.320 --> 02:33:28.760
 because I was around at this time too and knowing what was going on in 99 it's

02:33:28.760 --> 02:33:34.640
 always the aspiration as you pointed out these are what we'd like to see and then

02:33:34.640 --> 02:33:38.840
 oh by the way people buy land and they put bring in companies and you know I

02:33:38.840 --> 02:33:44.080
 got a whatever that I want to put in and then City Council and the planning

02:33:44.080 --> 02:33:49.200
 department and everybody has to go is that really gonna be best for us because

02:33:49.200 --> 02:33:54.520
 we don't know yet and then we just went through the City Council you just

02:33:54.520 --> 02:33:59.720
 approved the whole new how we say these are what kinds of buildings can go into

02:33:59.720 --> 02:34:04.240
 this neighborhood yeah and that was actually an outcropping of the 2030

02:34:04.240 --> 02:34:10.800
 right specifically asked for an update in the zoning code yeah and I think I

02:34:10.800 --> 02:34:14.880
 think it's important that that you brought that up and it's important to

02:34:14.880 --> 02:34:19.200
 know what's there for the 2030 plan but it's also important to know like what

02:34:19.200 --> 02:34:25.120
 you said talk where do we want to go in the future because if we don't have any

02:34:25.120 --> 02:34:29.680
 clue then we're gonna have really bad roads and hopscotch here there in the

02:34:29.680 --> 02:34:33.560
 other place and I don't know and so that's why it's important to have these

02:34:33.560 --> 02:34:37.160
 conversations certainly yeah I mean personally I just wanted to kind of get

02:34:37.160 --> 02:34:40.520
 some feedback but personally I I understand the need to plan for the

02:34:40.520 --> 02:34:45.720
 future so having these conversations with some of the landowners getting some

02:34:45.720 --> 02:34:49.520
 easements or right-of-ways in place that makes complete sense to me right

02:34:49.520 --> 02:34:56.360
 because 60 years from now we don't know right but within the near term it it

02:34:56.360 --> 02:35:04.280
 seems to me like even for lanes assumes a density of growth that the current plan

02:35:04.280 --> 02:35:08.880
 says we're not supposed to do yet I mean it basically says you know that another

02:35:08.880 --> 02:35:13.240
 quote I didn't read said proposed developments or uses that clearly

02:35:13.240 --> 02:35:17.400
 support implementation of the plan should be approved conversely rezonings

02:35:17.400 --> 02:35:21.120
 for developments or uses that are inconsistent with the plan should not be

02:35:21.120 --> 02:35:25.640
 granted approval until and unless the policies of the plan are amended based

02:35:25.640 --> 02:35:29.480
 on the findings of fact that clearly demonstrate the need for modification so

02:35:29.480 --> 02:35:33.680
 I understand your point that in practice that hasn't happened right but that's

02:35:33.680 --> 02:35:38.360
 what I read is this is the community came together and said this is what we

02:35:38.360 --> 02:36:00.880
 want back in 2014 2015 and everybody did choose more I forget which one they

02:36:00.880 --> 02:36:04.040
 chose higher but I know that the business is usual it was the lowest in

02:36:04.040 --> 02:36:08.800
 the 2014 2015 public input meetings I think there were at least two from it

02:36:08.800 --> 02:36:11.600
 actually found a Facebook group where you can see like all the stuff they

02:36:11.600 --> 02:36:19.720
 looked at there's like a whole album of picture and our point is there's not a

02:36:19.720 --> 02:36:23.600
 right answer to this question there's just an opportunity to potentially plan

02:36:23.600 --> 02:36:29.320
 that route to I 35 if the committee feels that it changes the character the

02:36:29.320 --> 02:36:34.480
 community too much and go out there that's fine but you know Todd's job is

02:36:34.480 --> 02:36:38.120
 to challenge your thinking and to say we might not have this opportunity again

02:36:38.120 --> 02:36:41.520
 that doesn't mean it won't be here the next time there's a bond election that

02:36:41.520 --> 02:36:45.760
 we're coming together but you certainly you know his point is trying to

02:36:45.760 --> 02:36:49.760
 leverage the dollars if you want to take advantage of it today if not we're

02:36:49.760 --> 02:36:53.600
 possibly still recommending straight down Hickory Creek and not have to deal

02:36:53.600 --> 02:36:58.800
 with any more kids in the creek out there and we're continuing to still see

02:36:58.800 --> 02:37:04.640
 infill in fact we've been in recent development meetings with more property

02:37:04.640 --> 02:37:08.220
 owners that are bringing developments in south of Thistle Hill between Hickory

02:37:08.220 --> 02:37:13.000
 Creek and Creedale so it's going to continue infilling there and that's the

02:37:13.000 --> 02:37:16.800
 only point so I anytime I see an engineer being put on the spot with the

02:37:16.800 --> 02:37:21.320
 planning question I want to go over and save him but anyway there really there

02:37:21.320 --> 02:37:25.680
 really is no right answer it's only what you think is the right answer now so but

02:37:25.680 --> 02:37:29.640
 but what I do hear you saying is that the right the right answer is to

02:37:29.640 --> 02:37:33.480
 straighten out Hickory Creek definitely and that's a 34 million dollar project

02:37:33.480 --> 02:37:37.560
 yes because because of the it's driven because of the floodplain and the and

02:37:37.560 --> 02:37:43.160
 going over that railroad track okay well I thought I heard 34 million dollars

02:37:43.160 --> 02:37:51.040
 includes design charges to take it on over to 35 w so the design money was

02:37:51.040 --> 02:37:55.240
 already approved by counselor this year that's not in the 34 million that

02:37:55.240 --> 02:38:01.480
 project that 34 million is the construction only yes to 1830 that yes

02:38:01.480 --> 02:38:06.480
 if we don't get the other dollars and we're told not to then obviously it'll

02:38:06.480 --> 02:38:11.560
 just go to 1830 it also includes any parcels that we do have to acquire the

02:38:11.560 --> 02:38:16.160
 other parts of a project the design piece part of the reason we're planning

02:38:16.160 --> 02:38:22.360
 all the way out to 1830 or to I 35 W is that when development comes in we do

02:38:22.360 --> 02:38:26.440
 have the alignment that's already been settled upon these conversations boy

02:38:26.440 --> 02:38:31.360
 have and and development doesn't get to choose where those roadways go they go

02:38:31.360 --> 02:38:37.520
 there but once you have those dollars approved for a bond election you could

02:38:37.520 --> 02:38:44.480
 change the the alignment that changed the direction move it a little here and

02:38:44.480 --> 02:38:50.680
 there and so forth right it's not locked in with a large change would have to go

02:38:50.680 --> 02:38:57.400
 back to council yeah to avoid a tree or to avoid a driveway yes I can do that

02:38:57.400 --> 02:39:05.400
 but even if it went back to council it would still be within yes yeah because I

02:39:05.400 --> 02:39:10.040
 didn't really realize that we all signed on to be cheerleaders for this until you

02:39:10.040 --> 02:39:17.640
 said so but we have to have a project here that we believe in that we can sell

02:39:17.640 --> 02:39:22.140
 and so so let me suggest that I think we've gotten a lot of information on

02:39:22.140 --> 02:39:27.520
 this project and then we really want to move toward prioritization and we need

02:39:27.520 --> 02:39:32.220
 to look at the list as we have it and then and then I think that's where we

02:39:32.220 --> 02:39:37.000
 begin to talk about where does this fall on our list and it gives us the

02:39:37.000 --> 02:39:43.360
 opportunity to talk specifically about about the order and and what the dollar

02:39:43.360 --> 02:39:50.160
 figures are in that order David

02:40:09.680 --> 02:40:13.720
 hey well this presentation will go over the results of the most recent

02:40:13.720 --> 02:40:17.960
 prioritization survey this part this is the second survey that we've done

02:40:17.960 --> 02:40:21.880
 obviously at the last meeting we presented the initial survey and the

02:40:21.880 --> 02:40:25.920
 committee asked to afford another survey after some additional information and to

02:40:25.920 --> 02:40:30.280
 see if there were any changes to the survey itself as I as I went over last

02:40:30.280 --> 02:40:35.240
 time I want to emphasize the survey is only intended to contribute to the

02:40:35.240 --> 02:40:39.160
 conversation you're about to have this is not any kind of staff recommendation

02:40:39.160 --> 02:40:44.160
 but I hope that it does contribute to that conversation we also in a later

02:40:44.160 --> 02:40:49.420
 slide you'll see we have tied these survey results to dot to aggregate

02:40:49.420 --> 02:40:53.760
 dollar amounts to help facilitate that conversation of the scenarios we looked

02:40:53.760 --> 02:40:57.480
 at earlier those different dollar amounts what projects could you fit in

02:40:57.480 --> 02:41:01.960
 based on this summary obviously as we go through this process we can talk through

02:41:01.960 --> 02:41:05.920
 different options if we moved other other projects under each of those

02:41:05.920 --> 02:41:11.120
 thresholds what it would look like and I think ultimately from this conversation

02:41:11.120 --> 02:41:14.520
 we get to that point where the committee gets comfortable with an ultimate

02:41:14.520 --> 02:41:22.120
 recommendation we had 17 of the 19 members respond to the survey in total

02:41:22.120 --> 02:41:26.080
 and you can see the unit their rankings here we have them on the next slide too

02:41:26.080 --> 02:41:30.960
 if this is difficult to see for everyone but obviously a police station renovation

02:41:30.960 --> 02:41:35.040
 number one fire station 8 and then the police substation those three public

02:41:35.040 --> 02:41:40.480
 facility projects public safety facility projects for the top three in the street

02:41:40.480 --> 02:41:45.840
 rehab program Bonnie Bray and Hickory Creek rounding out the top six from

02:41:45.840 --> 02:41:51.040
 there there is somewhat of a depth to sidewalks street lighting and Ryan Road

02:41:51.040 --> 02:41:56.080
 and later on we'll get to the there's also the additional question asked on

02:41:56.080 --> 02:41:59.840
 Ryan Road so I'll go through these slides and touch on that Ryan Road piece

02:41:59.840 --> 02:42:09.440
 and then lead into the conversation I hope you all have here's that chart

02:42:09.440 --> 02:42:14.880
 showing the aggregate amount and where those lines those lines form on for the

02:42:14.880 --> 02:42:18.200
 different dollar amounts and we have this in the next slide where you can see it

02:42:18.200 --> 02:42:22.800
 broken out actually by dollar amount but just I think this graph does a good job

02:42:22.800 --> 02:42:27.320
 of illustrating you know as you as you start increasing the projects here's

02:42:27.320 --> 02:42:30.280
 what you could do at a hundred million dollars you get those first three

02:42:30.280 --> 02:42:35.080
 projects and then some of the street rehab obviously street rehabs a large

02:42:35.080 --> 02:42:40.400
 amount so it takes up a good chunk and then when 180 million dollar projects

02:42:40.400 --> 02:42:43.560
 which we look we looked at the impacts of that previously and we can as you're

02:42:43.560 --> 02:42:47.840
 having the conversation go back to those slides to highlight what those what

02:42:47.840 --> 02:42:51.680
 those differences are with each of the projects you get up to that Hickory Creek

02:42:51.680 --> 02:42:56.080
 project and then 210 million dollars right up to where street lighting fell

02:42:56.080 --> 02:43:00.960
 at number eight which was right in front of Ryan Road Robinson in the firing

02:43:00.960 --> 02:43:07.500
 range a 235 million dollar project gets you those additional it's your Ryan Road

02:43:07.500 --> 02:43:15.920
 Robinson in the firing range here are those broken down you can see the the

02:43:15.920 --> 02:43:19.600
 project funding I'll just point out a couple of those variables that are still

02:43:19.600 --> 02:43:22.440
 out there that we just have plugged these in for planning purposes for your

02:43:22.440 --> 02:43:26.720
 conversation we have an excel sheet we can get we can manipulate these as we go

02:43:26.720 --> 02:43:29.760
 through the conversation have just thrown four million dollars in for Ryan

02:43:29.760 --> 02:43:33.400
 Road 10 million for street lighting and 10 million for open space for this

02:43:33.400 --> 02:43:37.800
 conversation I will note we have public art down here and I think this is a

02:43:37.800 --> 02:43:41.840
 great time to have that conversation on public art we put it in the survey just

02:43:41.840 --> 02:43:45.600
 for comparison state sakes and we've shown that 2% of the total funding

02:43:45.600 --> 02:43:49.040
 obviously that increase as we increase the cost of public safety facilities I

02:43:49.040 --> 02:43:52.920
 do think it's appropriate to think about that a little separately from the actual

02:43:52.920 --> 02:43:59.400
 ranking it's good to see it there but to know that if we look at adjusting what

02:43:59.400 --> 02:44:03.920
 we do with public art it could involve a change to the public art policy which we

02:44:03.920 --> 02:44:11.520
 could go to council with but open that up for y'all's discussion I think the

02:44:11.520 --> 02:44:21.940
 survey was set up such that you couldn't really give public art a number as such

02:44:21.940 --> 02:44:27.280
 because it's tied into number one two and three and I think it pretty much

02:44:27.280 --> 02:44:32.440
 goes there whether we pick it or not because that's our policy that's a city

02:44:32.440 --> 02:44:38.640
 council policy unless you wanted to ask them to adjust no we already voted not

02:44:38.640 --> 02:44:48.960
 to yeah well two things one is we have 300 almost $300,000 sitting in the

02:44:48.960 --> 02:44:56.280
 public art fund right now from the 2012-2014 bond election that is unspent

02:44:56.280 --> 02:45:02.680
 also there is a project in progress now by Paula Collins our nationally

02:45:02.680 --> 02:45:07.140
 recognized brick artist who did the Quaker town brick mural in the Civic

02:45:07.140 --> 02:45:16.480
 Center locally and other projects and it is it is carved it is completed it is

02:45:16.480 --> 02:45:22.560
 waiting to be fired and it will go in at the police station on Hickory and I have

02:45:22.560 --> 02:45:26.960
 can you show this

02:45:26.960 --> 02:45:35.400
 David I didn't I don't have that page where you were saying about the

02:45:35.400 --> 02:46:01.360
 prioritization survey might have seen 13 of 19 I don't see how well I mean not

02:46:01.360 --> 02:46:05.200
 that we don't in general I'm just saying on this particular circumstance

02:46:05.200 --> 02:46:12.000
 is the 2% in light of the fact that we already have money sitting unused right

02:46:12.000 --> 02:46:18.480
 now and there is this and it's a significant project right going in at

02:46:18.480 --> 02:46:24.680
 the police station it's 220 foot murals carved of the history of the Denton

02:46:24.680 --> 02:46:32.440
 Police Department and the other buildings that the other vertical bills on this

02:46:32.440 --> 02:46:37.520
 bond election are not buildings that the public is going to be using a lot it's

02:46:37.520 --> 02:46:44.440
 not they're not rec centers they're not city halls they're not civic centers I

02:46:44.440 --> 02:46:50.880
 I personally have a real problem with throwing 1.3 million at public art in

02:46:50.880 --> 02:47:05.160
 this bond proposal can you clarify that David 300,000 sure I can pull up a the

02:47:05.160 --> 02:47:09.760
 previous public art presentation we did kind of show the funding as it was I

02:47:09.760 --> 02:47:23.480
 think it's $274,000 David could you just not sell the bonds the 1.3 so that means

02:47:23.480 --> 02:47:44.400
 1.3 won't go to something else I think policy I think the final bring it back

02:47:44.400 --> 02:47:47.880
 back up obviously it was discussed previously was that the amount increased

02:47:47.880 --> 02:47:51.080
 significantly so just wanted to make sure because we are gonna have that

02:47:51.080 --> 02:47:55.640
 conversation of what's included in the total that at least everyone was aware of

02:47:55.640 --> 02:48:06.240
 that that figure came out of the public art committee back up last week yes yeah

02:48:06.240 --> 02:48:13.440
 we're originally looking at 900,000 because of the original amount we were

02:48:13.440 --> 02:48:25.360
 discussing so that's why I can't see if it's 2012 62,000 65,000 unallocated

02:48:25.360 --> 02:48:34.720
 there and then 40,000 unallocated so so the reality is there's really 65,000

02:48:34.720 --> 02:48:43.560
 that's on an allocator is that right did I do there and then also 74 and from the

02:48:43.560 --> 02:48:52.320
 2012 program so close to 200 now I will say some of these projects these are the

02:48:52.320 --> 02:48:56.240
 allocation for these projects it doesn't mean these projects have been complete

02:48:56.240 --> 02:49:00.840
 or are nearing completion so I just we just put the total here I don't have the

02:49:00.840 --> 02:49:04.520
 status of all these projects I know some of them have money allocated toward them

02:49:04.520 --> 02:49:09.680
 but they're not complete so and I believe that in the 2012 those were

02:49:09.680 --> 02:49:14.240
 intended to be signage areas around overpasses some of which have been done

02:49:14.240 --> 02:49:20.800
 but the other there's obviously still construction at 288 and and some of

02:49:20.800 --> 02:49:25.120
 those areas where you might end up with those kinds of medallions or whatever

02:49:25.120 --> 02:49:39.200
 you want to call yeah yeah 2012 was just on the street right and I think that's one of those pieces where the money has been allocated for that project but it has not been completed so it's

02:49:39.200 --> 02:49:42.800
 unspent dollars but we've shown it here is just it has been allocated toward that

02:49:42.800 --> 02:49:46.760
 project and I think the public art committee is having conversations on that

02:49:46.760 --> 02:49:55.440
 project specifically so there was a vote taken by this committee 2% 2% right under

02:49:55.440 --> 02:50:02.760
 option one right so so in order to have that conversation of whether or not to

02:50:02.760 --> 02:50:07.040
 change that vote or have another vote we need to have a motion to say hey we'd

02:50:07.040 --> 02:50:12.360
 like to have another proper our proper process on that would be a motion to

02:50:12.360 --> 02:50:20.000
 reconsider and it can only come from someone who voted in favor of the 2% he

02:50:20.000 --> 02:50:24.640
 voted against the 2% you can't make that motion well I wasn't here so I didn't

02:50:24.640 --> 02:50:29.120
 vote so I can't do it it was also not a binding vote because it was not on the

02:50:29.120 --> 02:50:36.440
 agenda for action it was effectively a straw poll I believe it's recorded in

02:50:36.440 --> 02:50:57.120
 the minutes otherwise my fair is if you start making exceptions now then it

02:50:57.120 --> 02:51:02.560
 impacts the future and all of a sudden we're without public art which is really

02:51:02.560 --> 02:51:09.400
 critical and important to the city and to it is important but this isn't our

02:51:09.400 --> 02:51:14.640
 last bond election that we will ever have no it's not and it's when you start

02:51:14.640 --> 02:51:18.720
 making exceptions and after the 2012 we made an exception that it had to be

02:51:18.720 --> 02:51:23.120
 vertical construction and then I think the argument would be now we want to make

02:51:23.120 --> 02:51:27.120
 an exception that we're going to reduce the percentage so that's that would be

02:51:27.120 --> 02:51:32.480
 the argument there and we're moving away from I have a question just I wanted to

02:51:32.480 --> 02:51:37.840
 clarify the 1.3 million we're talking about is that required my understanding

02:51:37.840 --> 02:51:42.680
 is it's required to be spent at those three locations no it is yeah I thought

02:51:42.680 --> 02:51:47.480
 that was be spent for public safety buildings but not those three locations

02:51:47.480 --> 02:51:52.440
 any public safety building any public safety building in the city what's

02:51:52.440 --> 02:52:00.440
 considered a public safety building it's not restricted to these three Tony so

02:52:00.440 --> 02:52:05.580
 Tony point the chief financial officer it's just to clarify so the calculation

02:52:05.580 --> 02:52:10.880
 of that 2% 4% is based on vertical construction so if so obviously here

02:52:10.880 --> 02:52:14.840
 it's based on public safety facilities and so if that's if that dollar amount

02:52:14.840 --> 02:52:20.560
 that 1.3 million is all put in the public safety proposition then as long

02:52:20.560 --> 02:52:24.360
 as that public guard is in any public safety facility doesn't have to be the

02:52:24.360 --> 02:52:28.000
 ones that are being proposed it could be any fire station any public safety

02:52:28.000 --> 02:52:34.040
 facility you're fine I just want to be very clear to that although the 2% is

02:52:34.040 --> 02:52:38.360
 being calculated about vertical construction that's only in the public

02:52:38.360 --> 02:52:43.040
 safety sector this committee could recommend to put all that 1.3 million

02:52:43.040 --> 02:52:47.560
 in the street proposition or a portion of it and so I just want to again those

02:52:47.560 --> 02:52:51.920
 are things that the committee needs to consider now once once public art is in

02:52:51.920 --> 02:52:55.520
 a proposition and it gets passed then we're limited to only being able to

02:52:55.520 --> 02:53:00.440
 spend those dollars in within that proposition in streets or in public

02:53:00.440 --> 02:53:04.000
 safety now if it's a standalone proposition I know you guys already

02:53:04.000 --> 02:53:10.200
 talked about and that's a whole different story so sorry that that helps

02:53:10.200 --> 02:53:13.440
 clarify some confusion I had before I guess so you're saying that we could

02:53:13.440 --> 02:53:18.780
 take the 2% of vertical construction and assign it to either one of the

02:53:18.780 --> 02:53:23.760
 propositions that we choose yes because the calculation is off of vertical

02:53:23.760 --> 02:53:28.200
 construction now where it gets allocated is purely up to the committee and then

02:53:28.200 --> 02:53:34.280
 the proposition for clarification I think the the way that the non public

02:53:34.280 --> 02:53:38.680
 safety proposition is written it includes parks and open space so if it

02:53:38.680 --> 02:53:42.280
 were included in that resolution would it have the ability to be spent by a

02:53:42.280 --> 02:53:48.520
 parks department in spaces so again it all depends on on what projects certainly

02:53:48.520 --> 02:53:51.960
 if there is going to be an open space component to this program likely there

02:53:51.960 --> 02:53:55.640
 will be a separate proposition right that's that's related to park

02:53:55.640 --> 02:53:59.960
 improvements it wouldn't be necessarily part of the streets or public safety so

02:53:59.960 --> 02:54:03.880
 there could be a component of public art that could go into that open space

02:54:03.880 --> 02:54:20.320
 theoretical proposition well I guess it comes down to is lighting public art or

02:54:20.320 --> 02:54:35.600
 not so if that 1.3 million goes into the street proposition then whatever public

02:54:35.600 --> 02:54:41.200
 art needs to be their component or tied to some type of street infrastructure

02:54:41.200 --> 02:54:48.040
 project it could be some of these calming art pieces it could be part of

02:54:48.040 --> 02:54:52.000
 retreat a retaining wall there's a number of things that the public art

02:54:52.000 --> 02:54:57.760
 committee could consider but again the tie is it has to be tied to a street or

02:54:57.760 --> 02:55:03.480
 transportation infrastructure speaking of lights like in like in Waco when you

02:55:03.480 --> 02:55:07.120
 go through Waco they built the bridge there by the McLean Stadium they're lit

02:55:07.120 --> 02:55:10.720
 up with lights that they change colors for different times of year fourth of

02:55:10.720 --> 02:55:15.240
 July was red white and blue it's green when they have games but is that

02:55:15.240 --> 02:55:19.800
 considered public art when you have LED lights and I was saying wouldn't that

02:55:19.800 --> 02:55:22.960
 then be something you could put into the street lighting so that you might might

02:55:22.960 --> 02:55:26.520
 not be a street but it would be a bridge or whatever is your lighting

02:55:26.520 --> 02:55:33.600
 I would just want to suggest I don't know that we need to be doing the public

02:55:33.600 --> 02:55:38.600
 arts committee's job in this yeah determining what is and isn't public

02:55:38.600 --> 02:55:43.200
 art I do think it gives us some options to be able to consider putting this in

02:55:43.200 --> 02:55:51.960
 into the second proposition I I would like to see us not request the 2% I

02:55:51.960 --> 02:55:58.800
 would like to see us request a variation in the policy and not have the 2% go to

02:55:58.800 --> 02:56:02.800
 public art in this bond election because we have needs that are so much more

02:56:02.800 --> 02:56:05.920
 critical right now

02:56:09.280 --> 02:56:15.600
 I'm sorry the last thing in the world you do is tell art teacher that we don't

02:56:15.600 --> 02:56:21.280
 want public art we live here in Denton we need to have a quality of life that's

02:56:21.280 --> 02:56:27.600
 attached to whatever it is we do whether it's public safety or the beauty of our

02:56:27.600 --> 02:56:32.600
 trees or whatever so I really appreciate what Tony said because I think that's a

02:56:32.600 --> 02:56:39.600
 wonderful use of that money is to put it into you know our streets and by the way

02:56:39.600 --> 02:56:48.680
 there are cities yes I research that do have contests for street lights I'd like

02:56:48.680 --> 02:56:55.800
 to make a motion all right can can we move that that million free be divided

02:56:55.800 --> 02:57:03.320
 proportionately between the police and public safety proposal and the streets

02:57:03.320 --> 02:57:10.480
 and based on not just well it's computed based on vertical but that it be

02:57:10.480 --> 02:57:17.920
 allocated to both the police and the street propositions based on their

02:57:17.920 --> 02:57:26.240
 percentage dollars well hang on so you let's just clarify you're making a

02:57:26.240 --> 02:57:33.760
 motion to spread the the 2% out over the two propositions that's correct and is

02:57:33.760 --> 02:57:49.720
 there a second no because we're still this this motion is still at 2% okay okay

02:57:49.720 --> 02:57:56.280
 so did I think Queen Queen's Queen got her hand up first as a as the second on

02:57:56.280 --> 02:58:03.800
 this okay this is not a motion to reconsider this is a motion for how to

02:58:03.800 --> 02:58:10.600
 spread the 2% out and so we have a motion and a second now discussion pay

02:58:10.600 --> 02:58:20.760
 just what I said I think our streets I know it's only 2% but 2% can you know

02:58:20.760 --> 02:58:27.640
 that's a million dollars effectively or more and that's real money and it can be

02:58:27.640 --> 02:58:33.480
 put to better use in this particular bond election at this particular time in

02:58:33.480 --> 02:58:38.640
 either streets or the vertical construction Patty would you have a

02:58:38.640 --> 02:58:42.160
 suggestion for a compromise amount perhaps it seems like there's several

02:58:42.160 --> 02:58:46.840
 members of the committee who are staunch advocates of public art money and others

02:58:46.840 --> 02:58:51.360
 who think that this bond package is pretty large already I wonder what you

02:58:51.360 --> 02:58:55.520
 would say to that well I think we have a motion on the floor right now so I think

02:58:55.520 --> 02:59:00.680
 we have to deal with it first this motion does not change the 2%

02:59:07.160 --> 02:59:22.840
 that's part of my problem again it is you know by being by being tied to

02:59:22.840 --> 02:59:28.040
 streets it can be in lots of different places where there would be traffic that

02:59:28.040 --> 02:59:37.920
 would see that it could be in multiple places around the city there's not it's

02:59:37.920 --> 02:59:41.880
 not limiting to that to these construction projects so that people can

02:59:41.880 --> 02:59:48.960
 see it it was proportionately based on the number of dollars in the in the

02:59:48.960 --> 02:59:57.400
 proposition so it would not say so you got 40 60 million out of the 230 so

02:59:57.400 --> 03:00:04.680
 sixty two hundred and thirties times 1.3 would go to the first pop to first

03:00:04.680 --> 03:00:11.400
 proposition I just have to ask how many public safety buildings are buildings

03:00:11.400 --> 03:00:15.640
 that the public generally goes to

03:00:27.400 --> 03:00:35.520
 that happens to be the police station when you go to the court

03:00:35.520 --> 03:00:43.320
 thinking of are you pretty much drive by it there's not really a lot of walking

03:00:43.320 --> 03:00:48.200
 traffic so it's harder for people to really stop and appreciate it you're

03:00:48.200 --> 03:00:52.480
 going too fast to really notice it so I just feel like there'd be maybe more

03:00:52.480 --> 03:00:55.960
 enjoyment if it were you know closer to the street or because I know a lot of

03:00:55.960 --> 03:01:02.680
 the safety facilities are little have a bit of a setback in a lot of cases let

03:01:02.680 --> 03:01:06.840
 me tell you where I think we are on this I think that that we can continue to

03:01:06.840 --> 03:01:11.320
 talk conceptually about it but I think we need to if you are if you have a

03:01:11.320 --> 03:01:14.920
 speech you want to make against the motion or a speech you want to make in

03:01:14.920 --> 03:01:19.480
 favor of it we need to we need to focus in on that area right now because we do

03:01:19.480 --> 03:01:24.880
 have a motion on the floor so I would go to if there is a speech in favor if

03:01:24.880 --> 03:01:28.480
 anybody would like to make that at this point or if there is a speech in

03:01:28.480 --> 03:01:33.160
 opposition to the motion can I ask a clarifying question about rules of

03:01:33.160 --> 03:01:40.920
 order okay what would be the proper procedural method to to seek an

03:01:40.920 --> 03:01:46.840
 amendment of the public art policy at this point well that's currently not on

03:01:46.840 --> 03:01:51.840
 the floor I understand and so to do that would require another motion a separate

03:01:51.840 --> 03:01:56.280
 motion and could that motion be made at this time or does it have to wait we

03:01:56.280 --> 03:02:01.160
 have to deal with this motion that's on the floor first question on the

03:02:01.160 --> 03:02:08.200
 structure of the proposition so if if you had public art based upon vertical

03:02:08.200 --> 03:02:15.440
 structures at 2% how would those be divided within the propositions just

03:02:15.440 --> 03:02:23.040
 however the committee because I recall the vote we had before straw poll or we

03:02:23.040 --> 03:02:28.360
 don't call it was was more about where where would public art be in a

03:02:28.360 --> 03:02:32.960
 proposition should be a separate proposition or should it be within the

03:02:32.960 --> 03:02:39.160
 in the public safety proposition and that's how we vote I don't I don't know

03:02:39.160 --> 03:02:47.200
 that it was what could be what I'm saying is there was a vote whether we

03:02:47.200 --> 03:02:54.200
 have it as a separate proposition and I know this is kind of getting off-subject

03:02:54.200 --> 03:03:02.000
 tail but it has a little bit of bearing on how I'm looking at it it's a it's a

03:03:02.000 --> 03:03:09.120
 much larger I'm all for public art but I don't it's a much larger number than we

03:03:09.120 --> 03:03:18.480
 have ever looked at from a public art standpoint and so being that much it

03:03:18.480 --> 03:03:25.260
 would be I'd be more comfortable if the voters decided that we wanted to have

03:03:25.260 --> 03:03:31.400
 the public art so you're proposing it be a separate line yeah but that's that's

03:03:31.400 --> 03:03:35.680
 that goes that has to we have to deal with the motions on the floor now

03:03:35.680 --> 03:03:41.280
 basically we'd have to vote motion down and then make another motion right I

03:03:41.280 --> 03:03:49.400
 would be okay withdraw yeah and then make another motion with this motion we

03:03:49.400 --> 03:03:54.960
 don't have to ask the City Council to change the policy right and we can

03:03:54.960 --> 03:04:04.200
 allocate it in other ways other than I have no problem with asking the City

03:04:04.200 --> 03:04:13.400
 Council to change policy they can do is say no on the 27th David I think it was

03:04:13.400 --> 03:04:20.640
 on the 27th so proportionally the what the motion you made is about 30% of this

03:04:20.640 --> 03:04:25.760
 would be spent on public safety facilities and about 70% on the second

03:04:25.760 --> 03:04:35.680
 proposition and I think on if we do 230 million that's what about 345,000 on

03:04:35.680 --> 03:04:44.420
 public safety yeah go down yeah but I need to see what the recommendation was

03:04:44.420 --> 03:04:49.600
 the paragraph Smith asked on the direction to include the following of

03:04:49.600 --> 03:04:56.320
 potential recommendation funding and be included in public safety facilities so

03:04:56.320 --> 03:05:00.560
 we'd have to we can't even have this conversation we can't have this vote

03:05:00.560 --> 03:05:07.360
 without doing a revision to that one I think the way I'm not a minute I think

03:05:07.360 --> 03:05:12.560
 the way this reads would be Pat made this motion but then Tim made a second

03:05:12.560 --> 03:05:23.000
 motion that just said 2% but it says calculated from vertical structure

03:05:23.000 --> 03:05:29.240
 construction has stipulated in the current policy and public safety

03:05:29.240 --> 03:05:39.600
 facilities proposition without it being on the agenda as an action item it is

03:05:39.600 --> 03:05:44.760
 not a binding vote and I think I call the point of order on this for that very

03:05:44.760 --> 03:05:56.880
 reason I would recommend that take whatever whatever we need to do to

03:05:56.880 --> 03:05:59.880
 preface it and just take a moat make a motion on whatever the committee

03:05:59.880 --> 03:06:04.800
 desires at this time and we can just as you start the motion say superseding any

03:06:04.800 --> 03:06:12.260
 previous motion this now takes effect okay we could go that route and that

03:06:12.260 --> 03:06:15.080
 would require the maker of the motion to withdraw the motion the maker of the

03:06:15.080 --> 03:06:28.200
 second to say okay I withdraw my motion and are you okay with that you know what

03:06:28.200 --> 03:06:34.480
 y'all have to excuse me because this is my first time so yeah I second the

03:06:34.480 --> 03:06:45.560
 motion to withdraw correct you're just agree to that motion oh okay okay now is

03:06:45.560 --> 03:06:52.640
 there is there a new motion that someone would like to put on the floor I move

03:06:52.640 --> 03:06:57.480
 that we ask the City Council to revise the policy or make an exception to the

03:06:57.480 --> 03:07:03.880
 policy so that the 2% that has been previously applied to public art in

03:07:03.880 --> 03:07:08.320
 vertical construction on bond elections not be applied to vertical construction

03:07:08.320 --> 03:07:17.960
 but to go into the the bond to the vertical construction itself or be

03:07:17.960 --> 03:07:28.240
 divided between that in streets I think your motion is a little vague right now

03:07:28.240 --> 03:07:32.800
 let's let's see if we can if we can find a way to tighten that up a little bit

03:07:32.800 --> 03:07:36.400
 let me see if I find well go ahead

03:07:36.400 --> 03:07:51.960
 in this election we have too many streets that need too much repair okay

03:07:51.960 --> 03:08:01.680
 so that is not what we had talked about having the motion to be so I think so if

03:08:01.680 --> 03:08:06.360
 I may what I'm hearing is potentially there would be some compromise if the

03:08:06.360 --> 03:08:12.060
 amount were reduced from 2% but that would require council action to make an

03:08:12.060 --> 03:08:19.360
 exception or modify the policy and then the choice of whether we assign it to

03:08:19.360 --> 03:08:29.480
 one or the other proposition or would be up to us but if we wanted to as sorry

03:08:29.480 --> 03:08:37.800
 sorry just past you yes no not just past Janet okay Randy as Randy suggested

03:08:37.800 --> 03:08:43.760
 potentially again reconsidering having it as a third proposition that would

03:08:43.760 --> 03:08:49.960
 also require an amendment to the policy is that accurate okay so I would like to

03:08:49.960 --> 03:08:58.960
 move that we I'd like to move that we ask council to amend the policy either

03:08:58.960 --> 03:09:06.760
 temporarily or permanently so that we could consider a value down to 1% and

03:09:06.760 --> 03:09:16.200
 that we would have the freedom to assign it to an individual bond item sorry

03:09:16.200 --> 03:09:22.600
 proposal if that's what the committee decides we already have that freedom we

03:09:22.600 --> 03:09:26.480
 can we can say we want it to be a standalone proposition okay then then

03:09:26.480 --> 03:09:32.320
 just strike the last clause of that and just say that I move to ask council to

03:09:32.320 --> 03:09:37.960
 make a an amendment to the to the proposal so that we could consider an

03:09:37.960 --> 03:09:44.660
 amount down to 1% just the the change would be to the policy itself not to the

03:09:44.660 --> 03:09:49.400
 establishing resolution of the committee yes so it's oh I think to do that you

03:09:49.400 --> 03:09:53.240
 would need to have a percent because right now says two to four so yeah okay

03:09:53.240 --> 03:10:00.000
 thank you so I move thank you for your patience I move that we ask council to

03:10:00.000 --> 03:10:07.400
 change the policy so that an amount for public art can be considered from the

03:10:07.400 --> 03:10:11.200
 range of one to four percent as opposed to two to four percent which is the

03:10:11.200 --> 03:10:18.620
 current policy would you be willing to make that a standalone item so that the

03:10:18.620 --> 03:10:22.800
 voters can decide that's an option that's before the committee already this

03:10:22.800 --> 03:10:27.520
 yeah we're just asking that we're asking the the count the council to change a

03:10:27.520 --> 03:10:34.360
 policy it where his motion is to change the policy to as low as 1% the

03:10:34.360 --> 03:10:42.160
 standalone proposition is something that's still at our discretion just a

03:10:42.160 --> 03:10:48.080
 very quick comment you know certainly the committee has a limited time so in

03:10:48.080 --> 03:10:51.720
 order for do kind of what you're saying we can certainly do that I think the

03:10:51.720 --> 03:10:55.400
 easiest way would be that if the committee is really wanting to consider

03:10:55.400 --> 03:11:00.520
 1% that part of your proposal back to the council along with amending that

03:11:00.520 --> 03:11:06.840
 policy is that you've submitted to them a 1% of public art to go into one of

03:11:06.840 --> 03:11:10.960
 these propositions or a standalone proposition and I think that that would

03:11:10.960 --> 03:11:15.560
 cover you and it would avoid us having to go to the council next week have this

03:11:15.560 --> 03:11:19.240
 conversation and that way it's all just packaged together so I think I think

03:11:19.240 --> 03:11:24.580
 your your recommendation is a valid one I would just encourage you to if it's

03:11:24.580 --> 03:11:29.040
 gonna be 1% where would you want that in which proposition or would it be a

03:11:29.040 --> 03:11:33.480
 standalone that does that make sense yes it's a bit it sounds like your

03:11:33.480 --> 03:11:37.480
 suggestion is that we don't need to ask for the policy to be amended we can just

03:11:37.480 --> 03:11:40.600
 decide what we'd like to do and then make that as part of our final proposal

03:11:40.600 --> 03:11:44.600
 certainly and if the council does not want to amend the public art proposition

03:11:44.600 --> 03:11:49.160
 then either council just drops public art entirely or the council could come

03:11:49.160 --> 03:12:00.080
 up with a different allocation okay okay so I think I think we needed we we need

03:12:00.080 --> 03:12:05.880
 a motion that that addresses that and I think your motion is your motion would

03:12:05.880 --> 03:12:16.040
 be that that we suggest that there were that you would move a 1% rather than 2%

03:12:16.040 --> 03:12:21.400
 yes and and my primary reasoning for that is that I was more comfortable with

03:12:21.400 --> 03:12:26.240
 2% when the vertical construction total was around 40 million and now it's up to

03:12:26.240 --> 03:12:33.520
 60 million so so is there a second

03:12:42.520 --> 03:12:45.680
 so I think the right I think the right way to start that off is that you're

03:12:45.680 --> 03:12:51.280
 moving to include in our final recommendation insert whatever it is

03:12:51.280 --> 03:12:56.240
 that you would like to have in final recommendation then we all vote on that

03:12:56.240 --> 03:13:11.600
 okay so so so I'll move to include for public art a total of 1% for vertical

03:13:11.600 --> 03:13:18.560
 construction but distribute that between the well I'm sorry I withdraw my motion

03:13:18.560 --> 03:13:23.160
 I don't feel like we've finished the discussion about how we would want to

03:13:23.160 --> 03:13:27.520
 allocate this I've heard several different ideas

03:13:27.520 --> 03:13:32.920
 why don't we shift the focus of our conversation why don't we table public

03:13:32.920 --> 03:13:35.880
 art for now because we're not making much progress on that let's get to some

03:13:35.880 --> 03:13:41.120
 of the other not to say that they're more important but the more higher dollar

03:13:41.120 --> 03:13:56.200
 value items on our plate at this moment so we can get through all this I think

03:13:56.200 --> 03:14:00.320
 I think ultimately when we come back next week obviously we're gonna be trying

03:14:00.320 --> 03:14:04.360
 to get to a decision so we're gonna come in with with three or four action items

03:14:04.360 --> 03:14:08.720
 of let's decide public art let's decide the total amount dollar amount let's

03:14:08.720 --> 03:14:12.440
 decide the projects and then make that ultimate recommendation so we could just

03:14:12.440 --> 03:14:15.840
 roll that into that I think this is obviously a good conversation in advance

03:14:15.840 --> 03:14:19.760
 of that and that way we don't have to do a motion that you've got to try to figure

03:14:19.760 --> 03:14:24.080
 out what what what it is we mean we expect the best motion that any of us

03:14:24.080 --> 03:14:40.880
 have seen an entire committee next time my hope was we were going to get to the

03:14:40.880 --> 03:14:58.880
 prioritization list and how late do you all want to stay and I know for many

03:14:58.880 --> 03:15:07.200
 others as well and it's yeah my day is not over yet can I actually make a

03:15:07.200 --> 03:15:11.600
 motion yes and it's gonna be crazy y'all are gonna think I just want us in this

03:15:11.600 --> 03:15:15.960
 thing but I'm gonna make a motion that this bond committee recommends to the

03:15:15.960 --> 03:15:22.400
 City Council items 1 through 10 the police station the fire station the

03:15:22.400 --> 03:15:26.560
 substation the street we have added the rehab program of 70 million Bonnie break

03:15:26.560 --> 03:15:31.960
 Hickory Creek right at 34 million sidewalks at 12 mean street lights at

03:15:31.960 --> 03:15:38.280
 13.8 million actually and Ryan road right at he's making a motion yes Ryan

03:15:38.280 --> 03:15:45.080
 road at 4 million and Robinson road at 12.3 that's exactly 235 million dollars

03:15:45.080 --> 03:15:49.560
 with no funding for public art

03:15:49.560 --> 03:15:58.320
 was that the bad one okay retractable no funding public art but if the public

03:15:58.320 --> 03:16:04.400
 art has to be taken out of that number then it's still one through ten and it's

03:16:04.400 --> 03:16:07.800
 still one through ten but maybe maybe the street lighting or the sidewalk

03:16:07.800 --> 03:16:14.600
 problem has to be addressed all right there's a motion is there a second

03:16:18.840 --> 03:16:29.400
 I think that motion is gonna die second I had to try I like the way you're

03:16:29.400 --> 03:16:35.960
 thinking I would like to make a motion that we make a recommendation of items

03:16:35.960 --> 03:16:48.480
 1 through 6 1 through 6 exactly as presented and then we're gonna have to

03:16:48.480 --> 03:16:52.080
 discuss about the rest of it I don't know how to put that into my motion

03:16:52.080 --> 03:16:57.920
 though but I would like to have a at least that we can agree and not have to

03:16:57.920 --> 03:17:03.160
 sit here and go a line by line by line by line so my motion is to first make a

03:17:03.160 --> 03:17:08.360
 recommendation of 1 through 6 those be included that those definitely be

03:17:08.360 --> 03:17:15.320
 included no discussion we're done let's go there's a second for that motion I'd

03:17:15.320 --> 03:17:19.440
 like to offer a friendly amendment is it possible after the second you know

03:17:19.440 --> 03:17:24.360
 according to Roberts rules there's no such thing as a friendly amendment so

03:17:24.360 --> 03:17:30.360
 what do you want to do I think there's probably more disagreement on Hickory

03:17:30.360 --> 03:17:34.380
 Creek than the other five projects so would you be willing to just say one

03:17:34.380 --> 03:17:42.200
 through five for now and then then have that discussion for the conversation yes

03:17:42.200 --> 03:17:49.720
 I will change my motion to one to five and I will agree to that to be included

03:17:49.720 --> 03:18:02.480
 in our final recommendation all right there is a motion there is a second is

03:18:02.480 --> 03:18:08.480
 there any further discussion so let me ask question if we if we approve this

03:18:08.480 --> 03:18:14.720
 motion 1 through 5 is there any change that can be done on the first five not

03:18:14.720 --> 03:18:19.480
 taking them out for reducing but increasing yeah it's like Tim said so the

03:18:19.480 --> 03:18:23.640
 someone who originally votes on this in the future would have to come back and

03:18:23.640 --> 03:18:36.720
 make a motion okay any any other discussion seeing none all in favor of

03:18:36.720 --> 03:18:41.800
 the motion to make one through five part of this bond package would you please

03:18:41.800 --> 03:18:59.520
 raise your right hand opposed did you get it or not what okay all right so

03:18:59.520 --> 03:19:09.760
 that motion does pass the we can go on or we can take up the rest of it next

03:19:09.760 --> 03:19:17.640
 week what's your preference can I just make one note about next week next week

03:19:17.640 --> 03:19:22.240
 that I think the intent of next week will will be to just kind of jump

03:19:22.240 --> 03:19:25.760
 straight into this conversation and the public conversation if you have questions

03:19:25.760 --> 03:19:29.240
 on projects we can answer if we answer them but there won't be a formal

03:19:29.240 --> 03:19:32.640
 presentation on on any other projects we're just kind of getting straight to

03:19:32.640 --> 03:19:36.920
 this so that we can get that action because last next Thursday is really our

03:19:36.920 --> 03:19:42.720
 firm deadline okay David when we come back can we also have it was on an

03:19:42.720 --> 03:19:49.120
 early presentation I think it's in the first or second meeting of what the

03:19:49.120 --> 03:19:57.000
 leverage factor is on the rest of these let me just suggest maybe that on the

03:19:57.000 --> 03:20:02.320
 spreadsheet to sort of show that as a separate column that way we need to have

03:20:02.320 --> 03:20:05.640
 a presentation or discussion about it just to see that yeah just put the

03:20:05.640 --> 03:20:12.200
 visual up there is a motion to adjourn is there a second all in favor

03:20:12.200 --> 03:20:18.960
 opposed that motion is carried