 Good evening, welcome to the July 11th Special Citizens Bond Advisory Committee meeting.

00:00:13.180 --> 00:00:16.400
 We are going to have a full agenda tonight.

00:00:16.400 --> 00:00:23.360
 The first item on our agenda is to consider approval of the meeting minutes for June 20th,

00:00:23.360 --> 00:00:28.980
 2019, June 27th, the 3 p.m. and 6 p.m.

00:00:28.980 --> 00:00:29.980
 Pardon me.

00:00:29.980 --> 00:00:40.800
 Before we go into that though, we'll first take citizen comments that anyone would like

00:00:40.800 --> 00:00:41.800
 to make.

00:00:41.800 --> 00:00:43.800
 Is there any cards?

00:00:43.800 --> 00:01:03.800
 Is anyone wishing to speak, build out a card?

00:01:03.800 --> 00:01:19.520
 Okay.

00:01:19.520 --> 00:01:25.600
 What?

00:01:25.600 --> 00:01:29.720
 Yes.

00:01:29.720 --> 00:01:33.000
 Wait a minute here.

00:01:33.000 --> 00:01:37.760
 Just while this gentleman is preparing a card, a reminder that each speaker will be given

00:01:37.760 --> 00:01:42.920
 a total of three minutes to address items that he or she wishes to discuss that's listed

00:01:42.920 --> 00:01:45.080
 on the agenda.

00:01:45.080 --> 00:01:52.600
 The committee members are allowed to ask questions of the speaker pertaining to items that we're

00:01:52.600 --> 00:02:08.520
 considering for this Bond Program.

00:02:08.520 --> 00:02:09.520
 Do you have a question, sir?

00:02:09.520 --> 00:02:10.520
 I'm sorry.

00:02:10.520 --> 00:02:15.440
 Do you want questions or comments prior to your time over here?

00:02:15.440 --> 00:02:16.880
 Yes.

00:02:16.880 --> 00:02:22.320
 The first item on the agenda is citizen comments, so this would be the time for citizen comments.

00:02:22.320 --> 00:02:37.960
 Does everyone that intends to speak have a card that they're filling out?

00:02:37.960 --> 00:02:58.840
 I'm sorry, may I ask a question while we're waiting for the citizen comments?

00:02:58.840 --> 00:03:07.720
 This is only for items that are listed on today's agenda items, is that correct?

00:03:07.720 --> 00:03:12.520
 The items for today are pretty broad in the sense that we're talking about all projects

00:03:12.520 --> 00:03:19.520
 in the bond and the timeline for the bond and prioritization, so that really encompasses,

00:03:19.520 --> 00:03:23.520
 as long as the comments are about the bond program or any consideration to the bond program

00:03:23.520 --> 00:03:24.520
 that would apply to the agenda.

00:03:24.520 --> 00:03:41.080
 Okay, to the bond program, as given to the committee, the ramifications and restrictions

00:03:41.080 --> 00:03:42.080
 for the two options that we were given?

00:03:42.080 --> 00:03:43.080
 We really get into each project and we even have considerations for what could be involved

00:03:43.080 --> 00:03:46.800
 in the bond program, so if the comments in any way relate to the bond program, they would

00:03:46.800 --> 00:03:47.800
 be appropriate.

00:03:47.800 --> 00:03:55.520
 Okay, so just anything regarding any kind of, we'd like this to be on the bond?

00:03:55.520 --> 00:03:56.520
 Sure.

00:03:56.520 --> 00:03:59.360
 And we're going to do this for how long?

00:03:59.360 --> 00:04:01.080
 As many people as have comments.

00:04:01.080 --> 00:04:09.280
 Okay, as many people as have comments, three minutes each, right?

00:04:09.280 --> 00:04:10.280
 Correct.

00:04:10.280 --> 00:04:11.280
 Yep.

00:04:11.280 --> 00:04:12.280
 All right.

00:04:12.280 --> 00:04:13.280
 Thank you.

00:04:13.280 --> 00:04:14.800
 Okay, I have two cards.

00:04:14.800 --> 00:04:19.800
 The first individual is Mr. Richard Schanauer.

00:04:19.800 --> 00:04:26.360
 Schanhaus, my apologies.

00:04:26.360 --> 00:04:35.920
 And sir, would you please come up to the podium and speak into the microphone?

00:04:35.920 --> 00:04:44.760
 Well, I'm here tonight because I'm a resident in Argyle.

00:04:44.760 --> 00:05:00.800
 And I'm here tonight because I'm a resident in Argyle, and I'm here tonight because I'm

00:05:00.800 --> 00:05:12.520
 a resident in Argyle, and I'm here tonight because I'm a resident in Argyle, and I'm

00:05:12.520 --> 00:05:19.880
 a resident in Argyle, and I'm here tonight because I'm a resident in Argyle, and I'm

00:05:19.880 --> 00:05:28.920
 a resident in Argyle, and I'm here tonight because I'm a resident in Argyle, and I'm

00:05:28.920 --> 00:05:39.840
 a resident in Argyle, and I'm here tonight because I'm a resident in Argyle, and I'm

00:05:39.840 --> 00:05:52.360
 a resident in Argyle, and I'm a resident in Argyle, and I'm a resident in Argyle, and

00:05:52.360 --> 00:06:08.960
 I'm a resident in Argyle, and I'm a resident in Argyle, and I'm a resident in Argyle,

00:06:08.960 --> 00:06:20.720
 from you guys. All this is we've seen from websites and whether it's text dot or county

00:06:20.720 --> 00:06:27.240
 or city planning that has gone on the nice little six lane divided highway with like

00:06:27.240 --> 00:06:32.960
 office buildings on each side but it's it's not as you know a rule out there. So that's

00:06:32.960 --> 00:06:43.440
 my concern and I'm here tonight to hear is this I understand there's a bond bond election

00:06:43.440 --> 00:06:48.960
 in November that has to go forward before any of this but where's all the money coming

00:06:48.960 --> 00:06:53.440
 from there's a lot of different entities with the North Texas government and the county

00:06:53.440 --> 00:06:58.680
 and the city and text dot and it doesn't seem like all that money is actually put been put

00:06:58.680 --> 00:07:14.660
 together yet so we would just like some clear clarification on what we're facing. West of

00:07:14.660 --> 00:07:29.200
 1830 yes ma'am. West of 1830 between 1830 and 377 it's because brush creek dead ends

00:07:29.200 --> 00:07:35.000
 into 377. I'm on the south side and we're actually closer to the street on the south

00:07:35.000 --> 00:07:40.240
 side than the properties on the north side are but it seems like from the information

00:07:40.240 --> 00:07:44.720
 we found that they're going to they're going to take you know from the middle of the road

00:07:44.720 --> 00:07:53.160
 about 70 feet each way. From the website we've been determined that that kind of footage

00:07:53.160 --> 00:07:59.640
 would be required for maybe even more for a road like that for a highway like that.

00:07:59.640 --> 00:08:12.640
 So yes but there's no road there it goes you have to cut through ranch farmland ranch land

00:08:12.640 --> 00:08:23.480
 some time time we got three minutes up and Diana if you could speak into a microphone

00:08:23.480 --> 00:08:35.520
 so we can hear you thank you. Is there a map that we can be looking at if people are going

00:08:35.520 --> 00:08:58.120
 to be interested in? Yes can you get you a map? Oh thank you very much. We're on Wood Creek

00:08:58.120 --> 00:09:13.680
 Circle which is right behind the Denton Company Club 17 and the side of us in there. But it's

00:09:13.680 --> 00:09:29.120
 my house and my house is right adjacent right along. So some of your questions are what

00:09:29.120 --> 00:09:33.920
 I would say are of a technical nature would it be better for you to sit down with a staff

00:09:33.920 --> 00:09:54.120
 person and talk through that first. Okay all right yes sir. Thank you. Thank you. All right

00:09:54.120 --> 00:10:12.080
 next we have Mr. John Davis. It's been a while since I spoke from this podium and first time

00:10:12.080 --> 00:10:19.000
 I've ever been limited to three minutes. First let me thank you citizen members of this committee

00:10:19.000 --> 00:10:25.280
 here for taking time out of your busy schedules to center these projects for our community

00:10:25.280 --> 00:10:36.440
 here and your efforts are really appreciated. I've spent I have 46 and a half plus years

00:10:36.440 --> 00:10:43.560
 as a civil engineer most of my career was spent planning designing building and maintaining

00:10:43.560 --> 00:10:49.920
 major roadway projects so I couch that with the suggestions and comments that I'm going

00:10:49.920 --> 00:10:56.760
 to give you. One is for your roadway projects that you're considering I believe it's a little

00:10:56.760 --> 00:11:06.040
 bit premature. The city is in the process now of updating the 2015 mobility plan. The

00:11:06.040 --> 00:11:13.480
 mobility plan is to guide priorities of roadway projects for capacity projects in the future

00:11:13.480 --> 00:11:18.620
 they're in the process of updating that and that update is scheduled to be completed in

00:11:18.620 --> 00:11:26.040
 February of 2020 so it would seem that you might want or the city and the committee might

00:11:26.040 --> 00:11:33.080
 want to wait till that mobility plan is updated to look at the roadway projects and prioritize

00:11:33.080 --> 00:11:39.440
 them there and see if that brings any new data that would put the election a year from

00:11:39.440 --> 00:11:50.360
 now. The second thing is on the staff recommended project of Hickory Creek Road extension I'm

00:11:50.360 --> 00:11:57.320
 sorry let me back up a second. Actually with the 2015 plan one of the most highest priority

00:11:57.320 --> 00:12:05.560
 roadways in the southern area would be Hobson Lane to widen Hobson Lane and at that you

00:12:05.560 --> 00:12:12.400
 should be correcting the intersection at Hobson Country Club and Fort Worth Drive those people

00:12:12.400 --> 00:12:18.120
 who drive that area in the afternoon know how much it backs up there but Hobson has

00:12:18.120 --> 00:12:27.160
 a greater current traffic and projected traffic than Ryan or Hickory Creek. Now jumping down

00:12:27.160 --> 00:12:35.400
 to Hickory Creek the congested area of Hickory Creek if you will is east of River Pass between

00:12:35.400 --> 00:12:44.400
 River Pass and Keesley Lane there where the houses are. West of that there is no level

00:12:44.400 --> 00:12:52.080
 of service D it's A if at the very worst I'm sorry probably B at the very worst except

00:12:52.080 --> 00:12:58.460
 at the intersection of Country Club there which at the one time the city had plans to

00:12:58.460 --> 00:13:07.240
 improve that the intersection there that would improve that congestion point there. But with

00:13:07.240 --> 00:13:19.800
 the recommended routing of Hickory Creek straight west to 377. Sir your three minutes are up.

00:13:19.800 --> 00:13:27.720
 Okay the best routing would be northwest through the floodplain farmland there and tied to

00:13:27.720 --> 00:13:35.360
 Vintage Road. That way it would connect with the future widening of loop 288 west and connect

00:13:35.360 --> 00:13:41.600
 to an existing six lane project that's already planned and funded. Thank you for your time.

00:13:41.600 --> 00:13:49.560
 Thank you for your comments. Thank you. Is there any other cards at this time? Alright

00:13:49.560 --> 00:13:59.600
 thank you very much. Alright without any other public comments we'll move on to item 2A I

00:13:59.600 --> 00:14:08.560
 believe David of going over the meeting minutes for the last three meetings. Has everyone

00:14:08.560 --> 00:14:23.440
 had a chance to look at those? Any comments or concerns about meeting minutes? Good evening

00:14:23.440 --> 00:14:35.760
 everyone. I was concerned about I believe I tried to address the May 30th meeting but

00:14:35.760 --> 00:14:44.840
 after that there were concerns because the draft minutes did not reflect but only towards

00:14:44.840 --> 00:14:55.120
 certain people that were already on the committee prior to I've noticed that you know when I

00:14:55.120 --> 00:15:09.520
 tried to convey that there needs to be minutes shown that we voted as a whole committee that

00:15:09.520 --> 00:15:18.400
 should have been on the May 30th minutes and it wasn't and I addressed that at the second

00:15:18.400 --> 00:15:28.740
 meeting that we were at and so I tried to reach out to the director of finance about

00:15:28.740 --> 00:15:38.080
 the minutes and you know notice that I just I had to bring it forward that's what I was

00:15:38.080 --> 00:15:46.120
 told that I had to do and I felt like I had did that anyway on record on the second meeting

00:15:46.120 --> 00:16:00.640
 but again I was not heard and there is another committee member who is you know the same

00:16:00.640 --> 00:16:11.880
 ethnicity as I and she has brought up concerns about an area that was posted publicly that

00:16:11.880 --> 00:16:20.960
 has not been addressed and that would be the southeast Denton location and yet none of

00:16:20.960 --> 00:16:26.600
 her concerns or questions were also a part of the draft meetings but most importantly

00:16:26.600 --> 00:16:36.200
 we did a motion on the first meeting that needs to be reflected in the minutes and that

00:16:36.200 --> 00:16:42.800
 it's not I'm really shocked about the fact that it's not and before this month is over

00:16:42.800 --> 00:16:49.440
 that would need to be corrected and you know it's imperative that I address the concerning

00:16:49.440 --> 00:17:00.480
 issues of the Dent community being that we are a committee, we are not an ad hoc committee,

00:17:00.480 --> 00:17:12.040
 we are a standing committee, we meet regularly and we discuss business in our meetings and

00:17:12.040 --> 00:17:25.560
 when I spoke at the June 27th meeting regarding somehow we are having subcommittees after

00:17:25.560 --> 00:17:32.920
 we made a decision not to have subcommittees and they were labeled as task force committees,

00:17:32.920 --> 00:17:44.240
 they were labeled as aka finance meetings or a finance meeting group and some of our

00:17:44.240 --> 00:17:51.160
 counterparts that are on the committee had noticed that we did not vote on a subcommittee

00:17:51.160 --> 00:18:03.440
 and you know I've noticed that we also came to a conclusion that oh my God an epiphany

00:18:03.440 --> 00:18:12.200
 this really is a subcommittee, it is not what it's supposed to be and I was really taken

00:18:12.200 --> 00:18:23.440
 back because to my face I was told basically a lie that it was not a subcommittee and then

00:18:23.440 --> 00:18:29.680
 in this it's on record saying that really it truly was a subcommittee so the article

00:18:29.680 --> 00:18:37.160
 came out for Denton Chronicle about the situation recently here and I believe that was past

00:18:37.160 --> 00:18:42.640
 Sunday that I didn't know that they were going to show up at the subcommittee but they did

00:18:42.640 --> 00:18:52.880
 and so when they noticed as well that it was labeled as such but really it was a subcommittee,

00:18:52.880 --> 00:19:00.360
 subcommittees I looked up what the subcommittee quorum should be, I don't know if everybody

00:19:00.360 --> 00:19:09.640
 on the committee knows what a quorum is, what it's supposed to have been I believe okay

00:19:09.640 --> 00:19:20.880
 there's 19 of us all together on this committee and so as a body we would have to have half

00:19:20.880 --> 00:19:28.840
 of the people from that committee which would have been 10 and one over to be able to meet

00:19:28.840 --> 00:19:45.280
 quorum and so right now we have a situation where June 27th the chairman says on record

00:19:45.280 --> 00:19:55.840
 that you know we've met twice as you know a task force and well both of those meetings

00:19:55.840 --> 00:19:59.400
 would have had to be posted but that's not the case.

00:19:59.400 --> 00:20:10.360
 The case is when I looked online I did not see but one post for the subcommittee and

00:20:10.360 --> 00:20:18.080
 I don't know if everybody has also went ahead and done and I don't know if everybody received

00:20:18.080 --> 00:20:27.040
 the same email that I got on May 30th but we were told that you would need to be looking

00:20:27.040 --> 00:20:35.120
 at this video to be certified about what's supposed to happen with an open meetings act

00:20:35.120 --> 00:20:45.120
 and so when I looked at the video today all of everything that I have experienced which

00:20:45.120 --> 00:20:54.000
 I will label as abuse of oppression because I felt like I was not heard and other members

00:20:54.000 --> 00:21:01.160
 on the committee have not been heard which would be to me being that the two that were

00:21:01.160 --> 00:21:11.880
 not heard in the draft minutes would be African American descent both of us is discrimination

00:21:11.880 --> 00:21:16.560
 and that is a part of abuse of oppression.

00:21:16.560 --> 00:21:28.240
 I am totally taken back about the opens meeting act because from my understanding it says

00:21:28.240 --> 00:21:39.520
 and I quote in order for members of a governmental body which is us subject to an open meetings

00:21:39.520 --> 00:21:47.320
 act are required to participate in education training sessions pursuant to section 551.005

00:21:47.320 --> 00:21:55.080
 of the Texas government code the training requirement applies to all elected or appointed

00:21:55.080 --> 00:22:03.560
 officials who participate in meetings subject to OMA however it does not apply to public

00:22:03.560 --> 00:22:11.040
 officials who do not conduct business in meetings subject to OMA and further down it says the

00:22:11.040 --> 00:22:18.640
 law requires that the members subject to the OMA complete training within 90 days of taking

00:22:18.640 --> 00:22:28.840
 the oath of office or otherwise assuming the responsibility of office and if you go online

00:22:28.840 --> 00:22:34.920
 you can see this is public information through the Texas attorney general's office.

00:22:34.920 --> 00:22:49.520
 So that said that makes the subcommittee that has been having meetings with us hardly because

00:22:49.520 --> 00:22:55.480
 some of the people in the committee did not even know that this is going on so right there

00:22:55.480 --> 00:23:04.520
 is a violation right there the second is that the violation with not posting the meeting

00:23:04.520 --> 00:23:11.040
 for the first time that you guys had met you didn't even list the names in the open meetings

00:23:11.040 --> 00:23:17.560
 act you have to list the name the time and the date of when you guys met online I saw

00:23:17.560 --> 00:23:28.600
 the second meeting for I believe it's July no June I want to say June it's the date in

00:23:28.600 --> 00:23:38.120
 June that I have printed out and it was about the second meeting there was no names listed

00:23:38.120 --> 00:23:46.440
 there was no time and date it had the video but those things were imperative to be a part

00:23:46.440 --> 00:23:54.360
 of the drafting minutes and it was not and according to the open meetings act in order

00:23:54.360 --> 00:24:02.680
 to have such participation you would have to meet quorum you would have to have those

00:24:02.680 --> 00:24:08.840
 dates and times people that you attended and you would have to have exactly everything

00:24:08.840 --> 00:24:15.360
 that was said in that meeting as a requirement in order to do it or you can't present whatever

00:24:15.360 --> 00:24:22.500
 you're trying to present to the committee because it would be considered a violation

00:24:22.500 --> 00:24:31.320
 because the public has to be able to be informed all the time when there's meetings like this

00:24:31.320 --> 00:24:38.920
 that has been brought to our attention and I can't do anything but I can't help but

00:24:38.920 --> 00:24:47.880
 to think who's responsible for allowing these subcommittees to go on even after we had a

00:24:47.880 --> 00:24:55.360
 vote not to have them they were disallowed I was kind of taken back to to notice that

00:24:55.360 --> 00:25:03.600
 somebody an authority had to have allowed that so I looked on the video and I saw that

00:25:03.600 --> 00:25:16.520
 it's the city manager and I saw that you know the director of finance you know was a part

00:25:16.520 --> 00:25:23.400
 of allowing these meetings to continue now I'm sure that they've taken I could be wrong

00:25:23.400 --> 00:25:28.480
 I could be wrong but I'm sure that they've taken these open meetings at training for

00:25:28.480 --> 00:25:35.400
 certification but we also I have I also saw that we also have to take it within 90 days

00:25:35.400 --> 00:25:46.360
 and no May 30th is when we first got word of this so that means June 30th July 30th

00:25:46.360 --> 00:25:57.240
 that's only 60 days I'm like we we have to do this and then we're talking about the cities

00:25:57.240 --> 00:26:07.480
 in debt being in debt about how that article came out about the state giving funds you

00:26:07.480 --> 00:26:15.040
 know to the city and the city has not the city of didn't the citizens have not felt

00:26:15.040 --> 00:26:22.320
 like the money was spent properly and there was nothing that could be squeezed out of

00:26:22.320 --> 00:26:31.400
 that but yet I find out online that the city manager was still able he got he got here

00:26:31.400 --> 00:26:43.800
 in 2016 in 2018 he was able to squeeze out 4% of getting a raise and I thought that we

00:26:43.800 --> 00:26:53.320
 were in debt so I wasn't sure what what what's going on with how we're conducting things

00:26:53.320 --> 00:27:02.360
 we can't go on Mr. Chair I'd like to ask if this is in order because you had minutes

00:27:02.360 --> 00:27:08.240
 minutes for approval on the floor and we don't have any kind of emotion we're just having

00:27:08.240 --> 00:27:17.760
 a speech could could I suggest could I suggest if that's the case if that's the case let's

00:27:17.760 --> 00:27:23.160
 vote on the minutes and then open open the floor for that but we have what is on the

00:27:23.160 --> 00:27:30.840
 floor is a motion on to approve the minutes from the June 27th meeting now there's a specific

00:27:30.840 --> 00:27:37.040
 thing that she wants to admit or to correct in the minutes let's correct the minutes but

00:27:37.040 --> 00:27:41.280
 but right now we're talking about a raise to the city manager which has nothing to do

00:27:41.280 --> 00:27:45.960
 with this bond election and due to the fact that I wasn't here for June 27th I don't

00:27:45.960 --> 00:27:50.120
 know if y'all heard about what happened why I wasn't here but that's why I would like

00:27:50.120 --> 00:27:54.760
 to hear what's going on what we're voting for so I would that's why I want to hear what

00:27:54.760 --> 00:28:05.680
 she has to say okay so this is this is a concern because as a body a governmental body such

00:28:05.680 --> 00:28:16.880
 as this we have issues before us that's brought to our attention and if we're not acting properly

00:28:16.880 --> 00:28:25.000
 towards the act you know we can't call ourselves an ad hoc meeting because it's not like we're

00:28:25.000 --> 00:28:30.760
 trying to do a festival and have you know a bunch of us just thinking about okay what

00:28:30.760 --> 00:28:33.880
 we're going to plan for that meeting and then we're not going to see each other again that's

00:28:33.880 --> 00:28:41.520
 what an ad hoc meeting our committee is but we are actually meeting regularly and conducting

00:28:41.520 --> 00:28:50.360
 business so that's what my concerns were I mean the quorum not being met you know being

00:28:50.360 --> 00:28:58.320
 another question when you say quorum was not met right for the for the full committee no

00:28:58.320 --> 00:29:04.820
 for this that the body members of the committee in order for you to do a subcommittee you

00:29:04.820 --> 00:29:11.880
 would have to have what half of the people from the committee come and then one over

00:29:11.880 --> 00:29:20.720
 so half of 19 is 11 so wait when you did the subcommittee you only had seven people at

00:29:20.720 --> 00:29:29.080
 that yeah so it was like mr. chairman I'm sorry at the May 30th draft minutes it says

00:29:29.080 --> 00:29:36.040
 it was a task force correct what was were the because I was not I can't remember what

00:29:36.040 --> 00:29:44.040
 point I was here were the May 30th minutes approved yes yes so so it was a task force

00:29:44.040 --> 00:29:54.180
 that was created and I'm sorry I don't understand the the going from a task force to now a subcommittee

00:29:54.180 --> 00:29:59.720
 and I'm not sure if that's because in the meetings that I missed if there was a change

00:29:59.720 --> 00:30:08.000
 no thank you is there a chance that somebody could address the open like whether we actually

00:30:08.000 --> 00:30:16.640
 even fall under the open means at or is the city attorney here as he's coming up I will

00:30:16.640 --> 00:30:23.640
 point out that both the June 27th tight finance task force meeting was an open meeting that

00:30:23.640 --> 00:30:28.040
 was posted and we're approving the minutes for that meeting today it was open to all

00:30:28.040 --> 00:30:32.060
 committee members posted for the public obviously recorded for the public and the meeting today

00:30:32.060 --> 00:30:38.480
 for the finance committee the finance task force meeting was again posted open for the

00:30:38.480 --> 00:30:44.060
 open for the public and open for all members of the committee mr. chairman can I read from

00:30:44.060 --> 00:30:50.400
 the May 30th minutes I'm sorry that there is some confusion but these are the minutes

00:30:50.400 --> 00:30:57.440
 that were approved part of them following a discussion on the committee's next direction

00:30:57.440 --> 00:31:03.680
 committee chair Pat Smith call for a motion to form a task force to focus on the bond

00:31:03.680 --> 00:31:08.040
 programs financing where to draw the funding line and based on affordability researching

00:31:08.040 --> 00:31:15.280
 and providing options etc. Tim Crouch made a motion to form a task force focusing on

00:31:15.280 --> 00:31:27.400
 the proposed bond programs financing I seconded the motion and the motion passed unanimously

00:31:27.400 --> 00:31:33.520
 which is what we approved in our minutes from May the 30th you advised mr. Gaines that the

00:31:33.520 --> 00:31:38.520
 task force meetings be scheduled separately from the committee's meetings and offered

00:31:38.520 --> 00:31:49.160
 staffs assistance with posting the meetings they've been posted also chairman Smith invited

00:31:49.160 --> 00:31:55.280
 any of the committee members who wanted to be involved in the task force to participate

00:31:55.280 --> 00:32:01.600
 by contacting Susan Parker so we were all offered the opportunity to serve on the task force

00:32:01.600 --> 00:32:09.360
 committee and the motion was approved unanimously they show a hands of everybody who thought

00:32:09.360 --> 00:32:15.160
 that we voted on as a committee as a whole does everybody remember that or do you guys

00:32:15.160 --> 00:32:22.760
 remember just doing it as a subcommittee yeah so let me let me get me right the task force

00:32:22.760 --> 00:32:27.280
 committee is to take a vote on what we've discussed and bring that back to the whole

00:32:27.280 --> 00:32:32.320
 committee correct correct we go over it right right okay for the point of clarification

00:32:32.320 --> 00:32:37.040
 the task force meetings are open to all committee members there will be no vote at those meetings

00:32:37.040 --> 00:32:40.520
 they will come back whoever attends those meetings I believe the intent and this is

00:32:40.520 --> 00:32:46.040
 from the committee itself is for them just to come back and speak about any considerations

00:32:46.040 --> 00:32:50.360
 that they had during those meetings there is no vote at any of the finance meetings

00:32:50.360 --> 00:32:54.240
 and again those are open to all committee members and we've not taken any vote and

00:32:54.240 --> 00:33:06.160
 you know Queen I have a point of order that if you have a comment on an amendment to meeting

00:33:06.160 --> 00:33:12.880
 minutes that have need to be corrected then make make a motion to amend the meeting minutes

00:33:12.880 --> 00:33:20.600
 I did what's the motion I you made a motion for us to go ahead and have us vote as a whole

00:33:20.600 --> 00:33:26.280
 there was not if that vote that there was a subcommittee after that it was after we

00:33:26.280 --> 00:33:31.560
 voted doesn't make any sense how y'all came it wasn't even like the whole like when I

00:33:31.560 --> 00:33:38.760
 mentioned it even on June 27 not everybody even knew that there was a vote for a subcommittee

00:33:38.760 --> 00:33:43.200
 at all there that's because there wasn't a vote for a subcommittee there was a vote for

00:33:43.200 --> 00:33:48.600
 a task force but people are getting there are really believing that that task force

00:33:48.600 --> 00:33:56.040
 is doing business in the meetings it's nowhere so discussing finance business we're discussing

00:33:56.040 --> 00:34:01.760
 finance business but in and correct me I'm wrong today but we are not taking any vote

00:34:01.760 --> 00:34:08.720
 on any motion which would be considered formal business all we're doing is formulating recommend

00:34:08.720 --> 00:34:14.160
ations multiple recommendations which we intend to present tonight to the entire committee

00:34:14.160 --> 00:34:22.960
 and we were very careful not to vote on anything but simply to bring options to the full committee

00:34:22.960 --> 00:34:28.400
 which we intend to tonight but that opened to me abuse if have you ever done this before

00:34:28.400 --> 00:34:34.480
 that opens the meetings act yes yes so you would know that there would be no way that

00:34:34.480 --> 00:34:41.960
 you could present anything without you didn't have all of your all of not have to have all

00:34:41.960 --> 00:34:48.640
 of us there but you didn't even meet all the the quorum qualifications requirements well

00:34:48.640 --> 00:34:52.920
 I'm going to defer to the city attorney on that topic Larry calls to the city attorney's

00:34:52.920 --> 00:34:58.480
 office what I understand the minutes as they were read I was here for that meeting that's

00:34:58.480 --> 00:35:04.160
 what that's what occurred is that the task force was set up just for additional detailed

00:35:04.160 --> 00:35:10.600
 discussion by members of this body and that no formal action was going to be taken by

00:35:10.600 --> 00:35:15.920
 that body there's recommendations made by this by that task force this committee for

00:35:15.920 --> 00:35:20.400
 recommendation from this committee that else lady council that's all that was going on

00:35:20.400 --> 00:35:25.120
 it was posted to that it was also made available for everybody to show up and that there it

00:35:25.120 --> 00:35:31.440
 wasn't it's not two other it's only one showing for the posting for that for that for the

00:35:31.440 --> 00:35:37.320
 task force I'm just going off the records that I've viewed that have been posted online

00:35:37.320 --> 00:35:41.760
 in that in the minutes that have been approved yeah and unless somebody can point to where

00:35:41.760 --> 00:35:46.200
 there's been a specific violation I'm not seeing anything now that's not for me helping

00:35:46.200 --> 00:35:50.520
 to make the decision on that but I want you to understand is that what what the chair

00:35:50.520 --> 00:35:55.800
 is saying what other members are saying what the minutes reflect is that no decision is

00:35:55.800 --> 00:36:01.960
 being made to that task force task force with respect to the financing options are being

00:36:01.960 --> 00:36:07.800
 presented later they're just recommendations it's open for a full deliberation this evening

00:36:07.800 --> 00:36:14.020
 and so everybody sitting here at this table will have the ability to vote on every option

00:36:14.020 --> 00:36:18.880
 that's either recommended or not recommended by the task force and so you're going to be

00:36:18.880 --> 00:36:26.080
 able to have your opportunity to entertain anything the floor is going to be wide open

00:36:26.080 --> 00:36:32.400
 for it so I just wouldn't recommend it I wouldn't recommend it but I definitely was able to

00:36:32.400 --> 00:36:39.520
 at least point out everything that I saw and you know like I said it's just you're not

00:36:39.520 --> 00:36:48.520
 really supposed to do it but now you know on record that it's been been said and heard

00:36:48.520 --> 00:36:56.120
 but if you continue to do it anyway okay yeah I wouldn't do it though I wouldn't do it

00:36:56.120 --> 00:37:02.000
 I wouldn't wouldn't do it I promise you I wouldn't do it what wouldn't you do I would

00:37:02.000 --> 00:37:08.400
 not I would not present to the committee anything that you've discussed because right now there's

00:37:08.400 --> 00:37:17.400
 no posting of the first meeting that you guys had to be meeting quorum and then the second

00:37:17.400 --> 00:37:24.360
 meeting did not have who was in the meeting the time or the date and that's the requirement

00:37:24.360 --> 00:37:30.720
 through the attorney general I wouldn't do it I wouldn't do it I wouldn't do it noted

00:37:30.720 --> 00:37:35.840
 thank you so I have a question with what she's stating there are several different meetings

00:37:35.840 --> 00:37:41.480
 that we've had that I had some concerns about Southeast Denton was that anywhere in the

00:37:41.480 --> 00:37:50.520
 meetings is that has that been brought up or I think it's in a tonight's meeting yeah

00:37:50.520 --> 00:37:57.520
 item 2d on the next item on the agenda will address Southeast Denton and the projects

00:37:57.520 --> 00:38:02.880
 are associated with shopping sit in the bond program do you agree though that David that's

00:38:02.880 --> 00:38:10.960
 a broad when you sent me that email about that it's for 70 million dollars and it's

00:38:10.960 --> 00:38:16.480
 only saying what's the term they're giving it it didn't name like how you're naming

00:38:16.480 --> 00:38:24.000
 Bonnie Ray Ray okay and how you're naming Hickory you're naming those I think that's

00:38:24.000 --> 00:38:30.620
 a great discussion to have when we get the to be I think okay I would like to move approval

00:38:30.620 --> 00:38:53.200
 of the June 27th meeting all three I'll second that motion any discussion other discussion

00:38:53.200 --> 00:39:01.720
 all in favor approving the June 20th June 27th and June 3 p.m. and June 27th at 6 p.m.

00:39:01.720 --> 00:39:19.400
 meeting minutes raise your right hand all opposed same sign motion passes all right

00:39:19.400 --> 00:39:28.440
 moving on to item to be take your way David good evening committee we're going to take

00:39:28.440 --> 00:39:33.600
 this opportunity to just touch on the projects at a high level and some changes to recent

00:39:33.600 --> 00:39:38.760
 changes that have just kind of changed some of our cost that just happened in the past

00:39:38.760 --> 00:39:44.840
 a couple of days I will say up to this point we've now presented all projects within within

00:39:44.840 --> 00:39:50.400
 the considerations for the bond program so this is obviously an opportunity to ask any

00:39:50.400 --> 00:39:56.800
 questions whether referencing former presentations or questions that you have regarding any program

00:39:56.800 --> 00:40:00.800
 this is a definitely an opportunity for that and we have staff here that could address

00:40:00.800 --> 00:40:06.080
 any of those projects I want to I want to start off the presentation by touching on our

00:40:06.080 --> 00:40:11.960
 public public safety facility projects just in the past couple of days we've had some

00:40:11.960 --> 00:40:17.040
 revisions to our estimates for the public safety facilities and obviously they're significant

00:40:17.040 --> 00:40:21.400
 and we wanted to bring this to the committee as soon as possible we engage in estimating

00:40:21.400 --> 00:40:27.560
 firm peak program value to review all of our all of our costs for these facility projects

00:40:27.560 --> 00:40:32.920
 for the police station renovation for the police substation for in for fire station

00:40:32.920 --> 00:40:37.160
 eight this is now the fourth review we've had of those dollars starting initially with

00:40:37.160 --> 00:40:43.040
 the city staff estimate and then going into our architect X estimate and the architect

00:40:43.040 --> 00:40:48.160
 even used an estimating firm but as we go forward we wanted to make sure that we felt

00:40:48.160 --> 00:40:53.320
 confident in the numbers so we brought in another firm to come in and take a hard look

00:40:53.320 --> 00:40:59.600
 at the cost this is a firm that has a nationwide footprint has worked with Louisville city

00:40:59.600 --> 00:41:03.440
 of Louisville quite a bit is currently working with the city of Richardson so we really take

00:41:03.440 --> 00:41:08.760
 a lot of value in their estimates and their opinion so they took a look at look at the

00:41:08.760 --> 00:41:14.120
 projects and you can see here in total they're recommending that we increase our cost estimates

00:41:14.120 --> 00:41:19.040
 by about twenty one million dollars between the two projects together an increase of close

00:41:19.040 --> 00:41:23.880
 to twelve million dollars for the police renovation and an increase of about nine and a half million

00:41:23.880 --> 00:41:30.400
 dollars for the police substation that increase at twenty one million dollar increase about

00:41:30.400 --> 00:41:35.480
 five million of that is just strictly construction costs so the construction estimates that we

00:41:35.480 --> 00:41:41.320
 had moving forward were pretty close to where we are now with this new estimate the remainder

00:41:41.320 --> 00:41:46.000
 of that delta between the five million and the twenty one million that additional sixteen

00:41:46.000 --> 00:41:51.240
 million is driven by these factors listed here the largest being an increased amount

00:41:51.240 --> 00:41:57.240
 for contingency and for cost inflation over the two three years that the project will

00:41:57.240 --> 00:42:02.600
 actually be going on until completion of the project the initial estimates did have an

00:42:02.600 --> 00:42:08.000
 amount for contingency and inflation but it was definitely a much lower amount than the

00:42:08.000 --> 00:42:11.520
 new estimators that have come in and looked at what we should really consider in these

00:42:11.520 --> 00:42:18.680
 costs should be so we feel more comfortable going with this larger amount for contingency

00:42:18.680 --> 00:42:26.000
 and inflation for these projects but it does have an impact on the total amount total dollar

00:42:26.000 --> 00:42:31.440
 amount I think from a staff perspective the worst thing we could do is go forward with

00:42:31.440 --> 00:42:38.240
 a bond election have a bond election approved eventually and be underfunded on these projects

00:42:38.240 --> 00:42:42.000
 there has been a number of months since our initial initial estimate in February or so

00:42:42.000 --> 00:42:47.440
 or even prior so the time time difference is going to have some some impact on that

00:42:47.440 --> 00:42:52.440
 as costs have increased but also I think it's a philosophical difference in how these estimators

00:42:52.440 --> 00:42:57.900
 have looked at the projects that have driven that increase the other the second second

00:42:57.900 --> 00:43:02.200
 largest increase in the dollar amounts in these estimates compared to the former estimates

00:43:02.200 --> 00:43:07.920
 are for infrastructure for IT security and AV systems these are obviously very significant

00:43:07.920 --> 00:43:14.420
 at any police station or substation and those increases are two to three million dollars

00:43:14.420 --> 00:43:20.880
 more now in this revised estimate than we had previously and given the nature of those

00:43:20.880 --> 00:43:27.320
 items at a police station we feel it's important that we include those those enhanced numbers

00:43:27.320 --> 00:43:32.560
 the remainder of the items here are not as significant as those top two and the construction

00:43:32.560 --> 00:43:38.740
 cost increases but we are now anticipating increased design engineering costs some professional

00:43:38.740 --> 00:43:43.960
 services that weren't included initially for material testing and then increased cost

00:43:43.960 --> 00:43:49.560
 for the furnitures and fixtures that are needed to fill out the buildings so again

00:43:49.560 --> 00:43:53.320
 we wanted to bring this to you as as soon as possible as soon as we got the numbers

00:43:53.320 --> 00:43:58.640
 especially as we're heading into that discussion with the committee of prioritization and ultimately

00:43:58.640 --> 00:44:03.200
 to decisions in the next couple of meetings so I'll open it up for any questions that

00:44:03.200 --> 00:44:13.160
 you have on this right now before before I continue microphone what is the estimated

00:44:13.160 --> 00:44:19.160
 completion of both of these projects in other words knowing the increase we have per month

00:44:19.160 --> 00:44:27.400
 just for roads do you see where this went is this actually enough well we feel like

00:44:27.400 --> 00:44:30.960
 this is enough we feel like we like this is this is a good dollar amount we would issue

00:44:30.960 --> 00:44:36.360
 these funds in 2021 the remainder of these funds in 2020 and 2021 and the project would

00:44:36.360 --> 00:44:45.560
 complete in 2022 thank you they did look at the fire station we have a preliminary estimate

00:44:45.560 --> 00:44:51.840
 on that it may it may vary slightly but it won't be anything anything close to us right

00:44:51.840 --> 00:44:54.840
 oh yes for sure

00:45:15.560 --> 00:45:39.400
 yeah $200,000 $400,000 over a million 1.3 Karen did you have a question Nathan did you

00:45:39.400 --> 00:45:48.120
 have a question John we had earlier talked about building a new police department if

00:45:48.120 --> 00:45:54.120
 you're really asking this kind of costs isn't it not more feasible to go ahead scratch this

00:45:54.120 --> 00:46:03.720
 and build a new police department you figured someone would ask that the our initial estimates

00:46:03.720 --> 00:46:07.560
 on the the new police station was about 20 million dollars more than what we're seeing

00:46:07.560 --> 00:46:11.080
 here so basically what happened when they went through and did the estimating they've

00:46:11.080 --> 00:46:15.800
 got recent bids from the Richardson project and they just finished up one in in Louisville

00:46:15.800 --> 00:46:20.680
 what they're saying is if you're carrying out these projects for the next 36 months

00:46:20.680 --> 00:46:27.760
 you've significantly underestimated the amount of that so I of the carry that you're going

00:46:27.760 --> 00:46:32.920
 to have to see a new the renovation project if we built new you're going to acquire additional

00:46:32.920 --> 00:46:36.160
 land and you're probably looking at another 20 to 25 million above and beyond what you're

00:46:36.160 --> 00:46:42.280
 seeing here it was it was not even a close Delta which is why we decided with the same

00:46:42.280 --> 00:46:46.440
 money back then we were discussing do we go ahead and build the substation so the chiefs

00:46:46.440 --> 00:46:52.560
 cut the ability to to put folks out in the areas out near Robeson and from that area

00:46:52.560 --> 00:46:56.560
 and they're not having to fight to get downtown and get out of their districts that long and

00:46:56.560 --> 00:47:00.400
 centralize it or do you just build a larger station and try and come up with a different

00:47:00.400 --> 00:47:04.760
 solution so when we added the two projects together we were pretty close to building

00:47:04.760 --> 00:47:15.480
 a new station itself I was doing a lot of research and I found in Round Rock for example

00:47:15.480 --> 00:47:21.840
 they use all their fire stations as police substations that would give you seven or eight

00:47:21.840 --> 00:47:29.400
 substations across the city and they do that simply by having small substations that the

00:47:29.400 --> 00:47:34.120
 unit can go to and they can download and do all their data and basically they don't have

00:47:34.120 --> 00:47:41.800
 to assign desks it's more like what you see where they share the desk sure so for Round

00:47:41.800 --> 00:47:45.960
 Rock specifically since I came from central Texas their city is not spread out as much

00:47:45.960 --> 00:47:51.320
 as we are it's a lot more condensed and compact where you can get away with doing that the

00:47:51.320 --> 00:47:56.400
 problem you have having officers working out of fire stations is you don't have a secure

00:47:56.400 --> 00:48:04.080
 way to drop off evidence evidence has to be secured for chain of custody you can't transport

00:48:04.080 --> 00:48:09.880
 prisoners to the substation to a fire station to stop and interview them you can't meet

00:48:09.880 --> 00:48:15.520
 complainants at fire stations to take interviews from or reports from they still have to take

00:48:15.520 --> 00:48:19.800
 all them back to their main police station downtown so because they're not as spread

00:48:19.800 --> 00:48:26.760
 out as we are it's very easy to do that to be able to work out of one police station

00:48:26.760 --> 00:48:31.880
 as we continue to grow it will be virtually impossible for us to do that without having

00:48:31.880 --> 00:48:40.100
 police officers out of their districts for a long period of time that was one of your

00:48:40.100 --> 00:48:45.720
 issues before was they couldn't stop in the parking lot and do their report but they could

00:48:45.720 --> 00:48:56.000
 go to a fire station and do that Chief what's your take on this in terms of cost growth

00:48:56.000 --> 00:49:15.560
 and do you have I defer to David Gaines honest answer for the extra 21 million are we getting

00:49:15.560 --> 00:49:26.680
 exactly what we had estimated or proposed that's it's no no extra benefits thrown in

00:49:26.680 --> 00:49:33.640
 in other words it's still you didn't cut scope to get scope hasn't the scope remained the

00:49:33.640 --> 00:49:39.080
 same and we just simply had new sets of eyes based on brand and most recent pricing says

00:49:39.080 --> 00:49:43.520
 how those were developed in terms of are we getting exactly need I'm gonna leave that

00:49:43.520 --> 00:49:48.240
 up to chief dancers I'm gonna use part of that design yeah definitely we are we are

00:49:48.240 --> 00:49:53.480
 getting exactly and that was a lot of the thought process before we even put together

00:49:53.480 --> 00:49:59.080
 a package to come forward with was to make sure that we wouldn't be recreating this process

00:49:59.080 --> 00:50:11.400
 again we're talking 30 40 years down the road I have one question only because we're looking

00:50:11.400 --> 00:50:17.440
 at this now going to City Council for you know we make a recommendation from this committee

00:50:17.440 --> 00:50:25.960
 to Council and then it goes on the November ballot voted yes or no how much more of an

00:50:25.960 --> 00:50:33.720
 increase between now and November or January when this starts have we looked at those increases

00:50:33.720 --> 00:50:42.080
 as well yes this these numbers were grossed up using current bid numbers and inflationary

00:50:42.080 --> 00:50:47.920
 factors to assume that we would have about a 36-month window so as long as and I've

00:50:47.920 --> 00:50:52.880
 been working with staff in order to move around some of the timing of the projects to make

00:50:52.880 --> 00:50:56.440
 sure that the public safety projects would be the first ones in the gate to try to stem

00:50:56.440 --> 00:51:03.320
 that we feel like we've got in I got a question this earlier today about the the road projects

00:51:03.320 --> 00:51:08.640
 that we definitely feel like we've got adequate contingency and inflationary escalation bill

00:51:08.640 --> 00:51:13.420
 on those based upon our even our most recent bids that we've left so both of those we feel

00:51:13.420 --> 00:51:19.720
 like we're comfortable for the next duration of bond program chief I have a question and

00:51:19.720 --> 00:51:33.200
 I'm sorry if I remember correct we wanted to do the substation first so that then functions

00:51:33.200 --> 00:51:39.120
 at the main station to move out to the substation correct which would then allow a phased renovation

00:51:39.120 --> 00:51:44.560
 of the main police station correct that's still that is still the plan yes sir so there

00:51:44.560 --> 00:51:52.360
 is a there is a linkage between the two if if you deferred the substation my guess is

00:51:52.360 --> 00:51:57.200
 there's going to be some additional cost to the renovation because you're not going to

00:51:57.200 --> 00:52:04.680
 have to create swing space is that a is that a term yeah swing space is a term you have

00:52:04.680 --> 00:52:09.240
 to create swing space for those functions that we're going to renovate to move to you

00:52:09.240 --> 00:52:14.600
 renovate and move them back correct accurate statement that is very accurate if we take

00:52:14.600 --> 00:52:20.040
 the substation out and we're only doing dealing with the station downtown we will have to

00:52:20.040 --> 00:52:26.960
 think of some way to move personnel around while it's being renovated whether it's bringing

00:52:26.960 --> 00:52:36.960
 in you know mobile buildings or repurposing space okay I think I think one of the other

00:52:36.960 --> 00:52:42.280
 things that we've also tried to do is we've been talking about going to a general construction

00:52:42.280 --> 00:52:47.160
 manager risk project contract for both buildings so they can coordinate both subs you know

00:52:47.160 --> 00:52:55.760
 concrete plumbing whatever it is and make the most of those efficiencies so this is

00:52:55.760 --> 00:52:59.320
 a pretty big change in price tag any other questions

00:52:59.320 --> 00:53:12.360
 so the tax rate assumptions were that 210 million was sort of no effect on the tax rate

00:53:12.360 --> 00:53:20.720
 is this now going to affect the tax rate well I will get we'll get into that discussion

00:53:20.720 --> 00:53:27.400
 here if we stay at the 210 we still feel the total tax rate will not go over our current

00:53:27.400 --> 00:53:32.840
 total tax rate and and I can just kind of jump to this quickly and this was in the finance

00:53:32.840 --> 00:53:37.120
 presentation that was sent to everyone along with additional backup information that went

00:53:37.120 --> 00:53:41.840
 along with that finance presentation but you can see if and I think right now we're at

00:53:41.840 --> 00:53:46.280
 a point where we feel comfortable going forward a five percent increase assumption and assessed

00:53:46.280 --> 00:53:51.480
 values that would be a four cent increase a max four cent increase on the debt service

00:53:51.480 --> 00:53:58.400
 tax rate specifically but it would keep us below the total tax rate at 210 if we were

00:53:58.400 --> 00:54:03.200
 were to go up and just add this additional amount and go up to 230 million dollars we're

00:54:03.200 --> 00:54:07.080
 going to run the numbers and get the increase will probably be about five and a half cents

00:54:07.080 --> 00:54:12.600
 on the debt service tax rate side that might take us over that total tax rate in one or

00:54:12.600 --> 00:54:16.800
 two years just for one or two years of that of the six-year window that's something that

00:54:16.800 --> 00:54:20.240
 we're going to run the numbers on to see what the impact on the total tax rate would be

00:54:20.240 --> 00:54:31.760
 how are you all calculating what the tax revenue is going to be when the appraisal district

00:54:31.760 --> 00:54:38.240
 challenges are ongoing and I was notified that mine wouldn't even be scheduled till possibly

00:54:38.240 --> 00:54:46.200
 November we're taken as educated of a guess as I can we we get we get assessed preliminary

00:54:46.200 --> 00:54:51.160
 reports on our assessed value we get 15 preliminary reports before our final report we've met

00:54:51.160 --> 00:54:55.680
 we just got our 15th report last Friday so we have two weeks net from now we'll get our

00:54:55.680 --> 00:55:01.680
 final certified values based on trends and last year how those values have decreased

00:55:01.680 --> 00:55:06.500
 I've made some assumptions on where we might end up in assessed values but it's a variable

00:55:06.500 --> 00:55:12.040
 out there the appraisal district has said they've had the record number of protests

00:55:12.040 --> 00:55:16.640
 so it is something that in two weeks we'll get our certified values and that'll be our

00:55:16.640 --> 00:55:21.600
 final number that we work from but up until that point we are making the best estimate

00:55:21.600 --> 00:55:25.640
 that we can and what the assessed value will be even though it will clearly be changing

00:55:25.640 --> 00:55:31.840
 all the way up to the protests I know they're doing commercial first and residential second

00:55:31.840 --> 00:55:37.080
 so basically the numbers that we have now we have our preliminary value we've reduced

00:55:37.080 --> 00:55:42.520
 that significantly anticipating those drops but you know it could be even more than we

00:55:42.520 --> 00:55:43.520
 anticipated.

00:55:43.520 --> 00:55:56.420
 David would you want to show the historical chart that you showed earlier?

00:55:56.420 --> 00:56:04.720
 So as we're discussing a 5% AV growth assumption here you can see our AV growth since 2008

00:56:04.720 --> 00:56:09.840
 we picked 2008 so that we could see kind of the impact of a recession if it were to come

00:56:09.840 --> 00:56:14.360
 obviously having one in 2008 and you always have somewhat delayed effect on property values

00:56:14.360 --> 00:56:19.440
 after a recession as they drop so you can see that we had that drop there but since

00:56:19.440 --> 00:56:26.240
 2011 we've had steady increases with significant increases from 2014 on currently we're estimating

00:56:26.240 --> 00:56:34.680
 a total increase in AV of about 8.8% if we look at just non-frozen values which obviously

00:56:34.680 --> 00:56:38.320
 we have our we have the tax freeze in place now our second year of the tax freeze it's

00:56:38.320 --> 00:56:44.020
 about 7.3% which is really the number that would be in our forecast so that's 7.3% increase

00:56:44.020 --> 00:56:47.400
 on those non-frozen values that we're looking at right now.

00:56:47.400 --> 00:56:56.680
 And David compared old versus new growth what are those ratios or those amounts?

00:56:56.680 --> 00:57:04.120
 Our new growth is around $420 million, $430 million and our total assessed value is around

00:57:04.120 --> 00:57:08.160
 $11 billion.

00:57:08.160 --> 00:57:16.440
 So new growth is about four tenths of a percent of the total tax base so if you're saying

00:57:16.440 --> 00:57:28.800
 well we've got new growth we're putting an eye dropper in the ocean.

00:57:28.800 --> 00:57:49.560
 Then that average is including the recession is six percent.

00:57:49.560 --> 00:57:59.880
 Alright do you want to go move on to the current project costs?

00:57:59.880 --> 00:58:04.880
 So a lot of numbers up here obviously but I thought it was important to just show from

00:58:04.880 --> 00:58:08.440
 a high level view what this change does to our total options.

00:58:08.440 --> 00:58:12.440
 You can see these are the estimates we've been working on and these numbers have obviously

00:58:12.440 --> 00:58:16.640
 tweaked and changed especially on the roadway project as we've gone through the process

00:58:16.640 --> 00:58:22.400
 notably on Ryan Road which decreased significantly when we saw the impact of Hickory Creek.

00:58:22.400 --> 00:58:29.320
 But you can see in total for our proposition for public safety facilities that estimate

00:58:29.320 --> 00:58:37.780
 has now increased from $45.5 million to $66.9 million including the police station renovation,

00:58:37.780 --> 00:58:42.440
 fire station aid, substation and firing range and I will note the order that we have these

00:58:42.440 --> 00:58:48.520
 in are these are the staff recommended how we would prioritize the projects for each

00:58:48.520 --> 00:58:53.080
 proposition with the renovation first, fire station aid second and then down on the roadways

00:58:53.080 --> 00:58:55.640
 Bonnie Grand, Hickory Creek.

00:58:55.640 --> 00:59:02.160
 So obviously what that does is we're at to stay at the two hundred and ten million dollar

00:59:02.160 --> 00:59:08.480
 mark we would either you know do something different in public safety facilities or do

00:59:08.480 --> 00:59:15.280
 something less in the roadways on one of the roadway projects or we would increase the

00:59:15.280 --> 00:59:20.840
 pie from the two ten to take into account the increased estimate for the public safety

00:59:20.840 --> 00:59:25.560
 facilities.

00:59:25.560 --> 00:59:27.560
 Any questions, comments?

00:59:27.560 --> 00:59:38.880
 So again I just one thing to point out and this is brought up at a previous meeting so

00:59:38.880 --> 00:59:43.680
 as we consider going up over the two hundred and ten our estimate is about fourteen million

00:59:43.680 --> 00:59:48.400
 if we add fourteen million dollars that would equate to a cent on the tax rate for that

00:59:48.400 --> 00:59:53.720
 max increase and again that max increase just means in one year we go that high it doesn't

00:59:53.720 --> 00:59:57.760
 mean we're going to be up to the max each of the six years of the program it's just

00:59:57.760 --> 01:00:02.520
 we hit that in one year but by the nature of debt service that fluctuates down following

01:00:02.520 --> 01:00:03.520
 that.

01:00:03.520 --> 01:00:06.880
 So fourteen million dollars and that's how we got to the point where we say that twenty

01:00:06.880 --> 01:00:12.120
 million is about a cent and a half increase over what we're showing here to say we're

01:00:12.120 --> 01:00:16.600
 at twenty million now so that's fourteen plus the six.

01:00:16.600 --> 01:00:26.440
 Sorry could you go back one slide on the Ryan Road, on the Ryan Road the total cost and

01:00:26.440 --> 01:00:34.480
 then the updated why did it go from ten million ten to twenty five million on the original

01:00:34.480 --> 01:00:38.480
 and then down to four to nineteen million.

01:00:38.480 --> 01:00:43.600
 That amount decreased more than that previously what this is showing here is just the four

01:00:43.600 --> 01:00:48.160
 to nineteen million would be the city funding up the funds in the bond program the additional

01:00:48.160 --> 01:00:51.160
 amount would be funds from other sources.

01:00:51.160 --> 01:00:56.760
 That amount did decrease from other iterations but that old amount's not included on the

01:00:56.760 --> 01:00:57.760
 bond program.

01:00:57.760 --> 01:00:58.760
 Thank you.

01:00:58.760 --> 01:00:59.760
 So I do have a quick question.

01:00:59.760 --> 01:01:00.760
 Sure.

01:01:00.760 --> 01:01:05.760
 On the street rehab program it has seventy million right?

01:01:05.760 --> 01:01:07.840
 Southeast Dent is part of that correct?

01:01:07.840 --> 01:01:08.840
 Correct.

01:01:08.840 --> 01:01:11.920
 How much of that is actually going toward Southeast Dent?

01:01:11.920 --> 01:01:15.500
 Ten point eight million of the seventy million on the street rehab program is going toward

01:01:15.500 --> 01:01:20.000
 Southeast Dent.

01:01:20.000 --> 01:01:25.680
 So if I can just jump to this quickly and give you a view of our estimates right now

01:01:25.680 --> 01:01:31.040
 for the time of the bond program in Southeast Denton we're estimating close to eleven million

01:01:31.040 --> 01:01:35.640
 dollars in the street rehab program about a half million dollars of the twelve million

01:01:35.640 --> 01:01:39.520
 dollar sidewalks program would be devoted to Southeast Denton for a total of eleven

01:01:39.520 --> 01:01:43.200
 point three included in the bond program in Southeast Denton.

01:01:43.200 --> 01:01:47.200
 We've also shown some of the other funding that won't be included in the bond program

01:01:47.200 --> 01:01:48.200
 but especially on the water.

01:01:48.200 --> 01:01:51.520
 Wastewater is really tied to a lot of the projects that would be going on with the street

01:01:51.520 --> 01:01:52.520
 rehab program.

01:01:52.520 --> 01:01:57.000
 We're estimating about twelve point four million dollars in investment from our utility

01:01:57.000 --> 01:02:01.240
 funding would go toward Southeast Denton and then another two point five million dollars

01:02:01.240 --> 01:02:05.560
 just for our regular maintenance that's paid through for our operating street fund would

01:02:05.560 --> 01:02:09.680
 go toward Southeast Denton over the life of this bond.

01:02:09.680 --> 01:02:15.720
 Okay so as being a resident and a business owner in Southeast Denton ten point eight

01:02:15.720 --> 01:02:18.640
 million we pay taxes over there as well.

01:02:18.640 --> 01:02:23.960
 Almost every street in Southeast Denton has potholes, not potholes, potholes and needs

01:02:23.960 --> 01:02:31.300
 repair not just continuing to patch the potholes we need the streets to be repaired.

01:02:31.300 --> 01:02:38.400
 So where does this come in and how much of the bond funds previously have been spent

01:02:38.400 --> 01:02:41.240
 on repairing Southeast Denton?

01:02:41.240 --> 01:02:48.400
 Todd, as the City Engineer as far as what previous bond dollars actually went into Southeast

01:02:48.400 --> 01:02:50.520
 Denton I'd have to go investigate that.

01:02:50.520 --> 01:02:54.000
 I don't know the answer to that one off the top of my head.

01:02:54.000 --> 01:03:05.760
 What I can show you is what David was talking about is there are several different avenues

01:03:05.760 --> 01:03:09.600
 that we would go down for every street so not every street in Southeast Denton falls

01:03:09.600 --> 01:03:15.400
 into that below 45 OCI category so it's yes it's got some potholes but there are certain

01:03:15.400 --> 01:03:19.820
 areas where we don't have to rebuild the entire street from the foundation of the roadway

01:03:19.820 --> 01:03:24.120
 all the way to the top where you're seeing a lot of potholes obviously there's something

01:03:24.120 --> 01:03:28.040
 going on but we don't necessarily have to rebuild the street from the bottom up that's

01:03:28.040 --> 01:03:32.880
 where the bond dollars go in that other two and a half million dollars the vast majority

01:03:32.880 --> 01:03:38.040
 of that would be what we would call a mill and overlay so most of those streets are asphalt

01:03:38.040 --> 01:03:43.000
 roadways so a mill and overlay we actually bring in the machine that chews up the entire

01:03:43.000 --> 01:03:46.840
 top layer of the roadway and it can go as deep as six to eight inches which would be

01:03:46.840 --> 01:03:51.960
 well lower than any of the potholes you're seeing out there and then we would rebuild

01:03:51.960 --> 01:03:56.940
 the entire street from that eight inches up those places are those places so you'll see

01:03:56.940 --> 01:03:59.880
 these areas on this map up here I don't know if you can see it all that well from where

01:03:59.880 --> 01:04:06.280
 you're at so any of these lines that are in green are roadways and this was as early or

01:04:06.280 --> 01:04:10.240
 as late as yet just earlier today we went and just double checked to make sure we had

01:04:10.240 --> 01:04:17.880
 the same the right information but the green areas are areas that it just need it needs

01:04:17.880 --> 01:04:22.080
 an oil change kind of like your car needs an oil change just to keep going so some of

01:04:22.080 --> 01:04:26.800
 those areas and you'll see it's it's a fairly small area in that entire southeast

01:04:26.800 --> 01:04:31.040
 dentin area but you're the green lines are where we would come and put a new surface

01:04:31.040 --> 01:04:36.580
 layer very thin layer on top so that it would last a much longer time these areas in yellow

01:04:36.580 --> 01:04:41.380
 probably we're seeing a lot more of the potholes along with the areas in red so these areas

01:04:41.380 --> 01:04:45.920
 in red we would rebuild the entire roadway from the foundation of the roadway which is

01:04:45.920 --> 01:04:52.080
 a good 24 to 30 inches deep in some places all the way back up so it's a brand new road

01:04:52.080 --> 01:04:57.040
 then the areas that you see in yellow the foundation of the road still in good shape

01:04:57.040 --> 01:05:01.880
 but it's that top course that needs to be ground down and replaced so that you don't

01:05:01.880 --> 01:05:05.240
 have that pothole condition and and that would be these areas in yellow

01:05:05.240 --> 01:05:11.040
 well some of the areas that i see that are in yellow and they you say that it's just

01:05:11.040 --> 01:05:16.840
 the top just where the potholes but if you go back and look these are just have been

01:05:16.840 --> 01:05:22.680
 just repaired over and over and i feel like if you stop just repairing it and just fix

01:05:22.680 --> 01:05:25.840
 what needs to be fixed then that'll save as well

01:05:25.840 --> 01:05:30.640
 so a pothole repair is different from a mill and overlay so a pothole repair which you've

01:05:30.640 --> 01:05:36.400
 been saying is i come in fill in that hole and just move on and hope that it lasts for

01:05:36.400 --> 01:05:40.400
 a while that's not what a mill and overlay is mill and overlay i'm gonna come in and

01:05:40.400 --> 01:05:46.080
 do the entire road so that's exactly what we're talking we're rebuilding the entire

01:05:46.080 --> 01:05:51.680
 road what you typically get with a pothole is there's been a crack or something that

01:05:51.680 --> 01:05:56.240
 started to develop a hole you see it throughout denton then over time as cars continue to

01:05:56.240 --> 01:06:00.960
 run over it or we get into the cold weather when we get that one or two freezes a year

01:06:00.960 --> 01:06:04.760
 here i mean we don't get that many but when you get a few of them water gets in there

01:06:04.760 --> 01:06:09.320
 and it sits and then it freezes and when water freezes it expands that makes the roadway

01:06:09.320 --> 01:06:13.440
 tear itself up even faster and then the cars continue to roll over just on and on and on

01:06:13.440 --> 01:06:18.360
 so those potholes just get bigger and if you don't address them when they're really small

01:06:18.360 --> 01:06:21.520
 then you get what you've got right now in so many places in denton you've got just a

01:06:21.520 --> 01:06:28.040
 lot of potholes the bottom of that is still good but that top six to eight inches sometimes

01:06:28.040 --> 01:06:32.440
 it's even nine inches depending on where you're in town that's the part we would be grinding

01:06:32.440 --> 01:06:37.120
 all the way down to the bottom all the way across the entire width of the roadway for

01:06:37.120 --> 01:06:43.040
 the entire length of that roadway and i do understand the difference um and i still feel

01:06:43.040 --> 01:06:50.800
 like a lot of the streets in southeast didn't need to have the total repair um there's you

01:06:50.800 --> 01:06:55.040
 go down one street sometimes you feel like you're going down a hill or up a hill and

01:06:55.040 --> 01:07:01.920
 it's supposed to be a straightaway so there's 15 roughly 15 lane miles that we've identified

01:07:01.920 --> 01:07:07.640
 it's 16 we call it 63 seconds but it's 15 lane miles of roadway in that southeast denton

01:07:07.640 --> 01:07:12.600
 area that absolutely has to be broken all the way down to the foundation rebuild the

01:07:12.600 --> 01:07:17.560
 foundation all the way back up you're 100 right and that's where the vast majority of

01:07:17.560 --> 01:07:22.760
 the bond money spent in this area would go so that nearly 11 million dollars would go

01:07:22.760 --> 01:07:29.480
 to that over that 15 lane miles then you've got about another four lane miles that wouldn't

01:07:29.480 --> 01:07:34.800
 get rebuilt it would get that milling overlay we'd come down nine inches and put nine brand

01:07:34.800 --> 01:07:39.860
 new inches or whatever the width the however deep the actual asphalt is we put a brand

01:07:39.860 --> 01:07:44.760
 new coat across the entire thing the entire width entire length down for the asphalt to

01:07:44.760 --> 01:07:51.320
 the top of the foundation and then you'd have another eight lane miles still in good condition

01:07:51.320 --> 01:07:57.680
 we just need to overtop it and just give it a longer life i had uh previously in previous

01:07:57.680 --> 01:08:03.520
 meetings requested some information um for southeast denton that some say i can find

01:08:03.520 --> 01:08:08.040
 it online but i was advised that it would be given to me i still haven't received that

01:08:08.040 --> 01:08:12.960
 i do i would like to receive it can you remind me what that information is um i asked about

01:08:12.960 --> 01:08:18.840
 when the last time the roads were repaired in southeast denton i did ask as well about

01:08:18.840 --> 01:08:24.480
 when was the how much was spent to repair the roads in southeast denton and um on the

01:08:24.480 --> 01:08:30.520
 out of the bond money previously as well um i was advised at the meeting that i asked well

01:08:30.520 --> 01:08:34.120
 we'll we don't have it now but we'll get it for your next meeting we didn't have it next

01:08:34.120 --> 01:08:39.280
 meeting my sincere apologies we have been doing a lot of things and we missed that one so

01:08:39.280 --> 01:08:44.320
 we will make sure that that gets taken care of therese we can make sure that's in the

01:08:44.320 --> 01:08:44.800
 meeting minutes

01:08:44.800 --> 01:08:51.920
 tog can you explain a little bit what's going to happen to locust and elm over the next year or

01:08:51.920 --> 01:09:02.320
 two yes i'm sorry i'm sorry i thought you were done no come on when i go southeast didn't y'all

01:09:02.320 --> 01:09:11.120
 know i'm stuck for um on the street repair it didn't the 70 million for that area stayed

01:09:11.120 --> 01:09:17.520
 the same with everyone else increasing or why didn't it increase in that area because due to

01:09:17.520 --> 01:09:25.040
 the fact that southeast didn't doesn't have any sidewalks there's no so i understand the new

01:09:25.040 --> 01:09:32.160
 areas being built they want sidewalks but i feel like instead of building sidewalks in areas that

01:09:32.160 --> 01:09:37.680
 really don't need it repair the streets that need to be repaired not only in southeast didn't there's

01:09:37.680 --> 01:09:43.360
 some downtown as well so instead of building sidewalks why don't we repair these streets

01:09:43.360 --> 01:09:47.680
 because the new neighborhoods don't just actually need sidewalks

01:09:47.680 --> 01:09:53.600
 i'm not sure i'm following where you're going if you're asking do you want to address that

01:09:53.600 --> 01:10:01.200
 so the uh so the original dollar amount that we had for the street rehab program

01:10:01.200 --> 01:10:04.880
 when we started the committee was 35 million dollars so we've we've increased that to 70

01:10:04.880 --> 01:10:08.240
 million dollars and that was a result of the previous meeting where we said we want to make

01:10:08.240 --> 01:10:15.680
 sure we get everything below the 20 oci for the bond for the street quality plus the neighborhoods

01:10:15.680 --> 01:10:22.880
 that were specified as far as the discussion between sidewalks and the street rehab program

01:10:22.880 --> 01:10:27.280
 i think that's a discussion for the committee to have as you start talking about prioritizations

01:10:27.280 --> 01:10:32.880
 and and what the ultimate uh recommendation for the bond program is and not to go back but

01:10:32.880 --> 01:10:38.400
 the young man that came up here first that mentioned that he's in a rural area and about

01:10:38.400 --> 01:10:46.240
 adding the streets out there if it's not a lot of traffic out there why aren't why are we repairing

01:10:46.240 --> 01:10:51.280
 and making making streets wider out there in that area when we have streets here that need to be

01:10:51.280 --> 01:10:58.000
 repaired there are quite a few reasons for that it's the growth of the community it's where we're

01:10:58.000 --> 01:11:04.160
 already seeing a lot of traffic but there's also the funding ability to grab to be able to get

01:11:04.160 --> 01:11:09.360
 funds from other resources to help us make that happen so the 36 million we're actually identifying

01:11:09.360 --> 01:11:16.000
 here resolves a tragic scenario that has occurred multiple times over over the last 30 years multiple

01:11:16.000 --> 01:11:22.080
 fatalities multiple accidents they recur that occur annually at the intersection just east of

01:11:22.080 --> 01:11:30.080
 the intersection of um let me call it of 1830 and hickory creek i mean most everybody i believe saw

01:11:30.080 --> 01:11:36.160
 the the news earlier this year and it's it's this segment of hickory creek road that comes to 1830

01:11:36.160 --> 01:11:40.640
 there is a significant amount of traffic that travels that way on a daily basis as they commute

01:11:40.640 --> 01:11:45.120
 to work and then come home as well as trying to get over to the high school on one side and multiple

01:11:45.120 --> 01:11:50.640
 elementary schools in the area it's an area that is growing there's multiple development

01:11:50.640 --> 01:11:55.040
 multiple developments coming into this area they're actively coming in they're

01:11:55.040 --> 01:12:00.640
 coming to council very soon or they are under construction in the area immediately to the north

01:12:00.640 --> 01:12:08.080
 the 36 million we're asking for now that would be in the bond would even if nobody else threw extra

01:12:08.080 --> 01:12:14.560
 money into the kitty to make this thing go further it would construct three lanes brand new with the

01:12:14.560 --> 01:12:21.440
 bridge all the way over to 1830 and resolve a current safety concern as well as improve the

01:12:21.440 --> 01:12:25.440
 capacity and volume in the area so people can get back and forth quicker and safer

01:12:25.440 --> 01:12:32.000
 so that that resolves that but it also unlocks a bunch of funding potential from other entities

01:12:32.000 --> 01:12:36.720
 that help us go further with those dollars now instead of waiting until they got super expensive

01:12:36.720 --> 01:12:45.440
 down the road i know i brought this up previously but everyone in southeast didn't just like everyone

01:12:45.440 --> 01:12:53.120
 else pay taxes southeast didn't didn't get their streets repaired or started working on them until

01:12:53.120 --> 01:13:01.280
 the late 60s early 70s but was paying taxes this whole time right so due to the point that we were

01:13:01.280 --> 01:13:10.240
 paying taxes are we getting that refunded saw that smile sorry no what one of the struggles we have

01:13:10.240 --> 01:13:15.280
 throughout the city didn't because the streets maintenance program was neglected across the city

01:13:15.280 --> 01:13:22.400
 for so long that taxes still over time weren't keeping pace because of the way they were diverted

01:13:22.400 --> 01:13:28.720
 and i can't answer the reasons why i don't know who or what groups made those decisions

01:13:29.520 --> 01:13:34.000
 i can only tell you where we're planning to go right now and that's a recognition that not just

01:13:34.000 --> 01:13:40.240
 because not just because there's an underserved put a portion of the city that infrastructure is

01:13:40.240 --> 01:13:45.120
 old it needs to be replaced just like we have a lot of aging infrastructure throughout the city

01:13:45.120 --> 01:13:48.880
 and it is one of the areas that needs the most attention right now that's why it is one of the

01:13:48.880 --> 01:13:55.040
 prime candidates and has been from the very start of the discussion for this program for this bond

01:13:55.040 --> 01:14:01.280
 program was to have this segment of town be in this bond program it was a prime focus here

01:14:01.280 --> 01:14:06.480
 i have a lot of people that have voiced their concerns about due to the fact that we are in

01:14:06.480 --> 01:14:12.400
 southeast denton we're across the tracks that we forgot about no one cares because we are in

01:14:12.400 --> 01:14:18.720
 southeast denton so okay let's just patch this up and they'll be happy and let's leave them alone

01:14:19.680 --> 01:14:26.880
 so that's how they're it's going way back so that's why it's a big concern southeast is a

01:14:26.880 --> 01:14:32.080
 real concern it's like you know we pay taxes like everyone else and now you're telling out of 70

01:14:32.080 --> 01:14:38.720
 million we're only getting 11 million when taxes have been paid bonds have been done previously

01:14:38.720 --> 01:14:46.400
 and streets need to be repaired we're been without sidewalks okay if get sidewalks fine if not fine

01:14:46.400 --> 01:14:52.080
 but the streets do need to be repaired half the time if you pass a car in one of the streets in

01:14:52.080 --> 01:15:00.480
 southeast denton you have to pull over to the side so one car can go by so that's why my concern is

01:15:00.480 --> 01:15:05.840
 we're worried about these new areas about having sidewalks and all of this what about the areas we

01:15:05.840 --> 01:15:12.560
 have now well and that is where the 70 million is focused on these roadways is on all of these areas

01:15:12.560 --> 01:15:18.000
 because it southeast end is an area of town there are a lot of other areas in town that also have

01:15:18.000 --> 01:15:23.120
 aging infrastructure and they fall into that same category that's a neglect that was prior to me

01:15:23.120 --> 01:15:29.280
 prior to you i mean there was a neglect that was there and how do we start making traction somewhere

01:15:29.280 --> 01:15:35.280
 we have to start at some point that's where we are today previous bond packages didn't even

01:15:35.280 --> 01:15:39.440
 begin to approach 70 million dollars on the transportation side when it came to just these

01:15:39.440 --> 01:15:43.680
 roadways neighborhood streets the local streets this is the first time i've ever seen the city

01:15:43.680 --> 01:15:49.280
 of denton actually go into 70 million dollars targeted to those streets and that is absolutely

01:15:49.280 --> 01:15:55.520
 what the conversation is for you all is as we prioritize this where do you see the priorities

01:15:55.520 --> 01:16:02.240
 where do you as a body want to go because i agree there are so many places to start where do you pick

01:16:03.680 --> 01:16:09.920
 you know you're looking at a program here that would engage full reconstruction of the streets

01:16:09.920 --> 01:16:15.040
 that really are just like anywhere else in town really are in bad shape and need to be completely

01:16:15.040 --> 01:16:20.160
 reconstructed and that includes the water the wastewater the drainage everything and that's

01:16:20.160 --> 01:16:24.000
 what you're seeing here is if you look at the numbers that we were putting together

01:16:32.880 --> 01:16:37.200
 these numbers here reflect a complete reconstruction of infrastructure within

01:16:37.200 --> 01:16:41.680
 that entire neighborhood there are three other neighborhoods that we're also targeting to go

01:16:41.680 --> 01:16:47.280
 into this bond program and then every other street within the city that's 20 oci or less that's in

01:16:47.280 --> 01:16:52.080
 that 70 million dollar number for just the streets but there's other funding sources the water

01:16:52.080 --> 01:16:57.360
 revenue funds wastewater revenue funds that help bolster that number through other ways so the total

01:16:57.360 --> 01:17:02.640
 expense when it comes to infrastructure in these areas has greatly increased beyond just the 10 or

01:17:02.640 --> 01:17:06.880
 11 million dollars to the roadway because that's what it costs to rebuild the road the total

01:17:06.880 --> 01:17:13.600
 investment into southeast denton and other places is a much bigger number so southeast denton goes

01:17:13.600 --> 01:17:20.880
 from 11.3 million to get sidewalks near the school to put in the roadway reconstruction plus

01:17:20.880 --> 01:17:26.320
 maintenance dollars that would go into the entire neighborhood and then you're going to put in

01:17:26.320 --> 01:17:31.680
 additional water wastewater revenue to upgrade all the utilities in that area as well it's aging

01:17:31.680 --> 01:17:36.800
 just as much as the roadway you're talking about a total expense of 25 to 26 million dollars

01:17:36.800 --> 01:17:44.560
 just in that neighborhood if you're asking can we spend more from an engineer's perspective

01:17:44.560 --> 01:17:49.600
 i don't see more to be spent not because you couldn't widen roadways you could but if i'm

01:17:49.600 --> 01:17:52.720
 rebuilding the current roadways that's what it costs to rebuild them

01:17:55.840 --> 01:18:02.720
 you go back to the the one with the all the roads of the yellow and the green and the red

01:18:02.720 --> 01:18:12.960
 you're really you're reconstructing close to 15 lane miles in southeast denton yes right for

01:18:14.400 --> 01:18:26.880
 can't read that number 8.6 million yes have y'all been to southeast this is my neighborhood yeah

01:18:26.880 --> 01:18:33.680
 so my thing of it is some people just drive through there every now and then some of us live

01:18:33.680 --> 01:18:39.040
 there right so to go through there every day and you need the same thing every day i've actually

01:18:39.040 --> 01:18:43.680
 walked down every street in southeast dent and knocked on several doors asking how they felt

01:18:43.680 --> 01:18:53.040
 about the streets and this is why i'm giving the feedback this is what i get i have the elderly i

01:18:53.040 --> 01:18:59.360
 have a woman not too far from she's not too far from walmart she lives in the apartment she's in

01:18:59.360 --> 01:19:04.320
 an electrical wheelchair there's still a dirt road over there that she has to go down with her

01:19:04.320 --> 01:19:11.920
 wheelchair so i'm like hmm wait a minute this this this isn't right so that's why i'm bringing it up

01:19:11.920 --> 01:19:17.680
 i'm bringing up the concerns not just for me but from my neighborhood but in for particular

01:19:17.680 --> 01:19:23.440
 scenarios like that because we have that in a lot of places in town where we have to go investigate

01:19:23.440 --> 01:19:28.400
 is work with the homeowner the property owner and find out what is the condition we have ada

01:19:28.400 --> 01:19:34.240
 resources that need to be provided throughout the city they just they're lacking it's it's years of

01:19:34.240 --> 01:19:40.960
 not taking care of that infrastructure that we're trying to catch up with now as well as i've got to

01:19:40.960 --> 01:19:45.520
 determine how much of where she is right now the particular person you're talking about is

01:19:45.520 --> 01:19:49.840
 is it on private property or is it in public property is it something i've got to go acquire

01:19:49.840 --> 01:19:55.200
 property is it i don't know without talking to that particular person i don't know and so many

01:19:55.200 --> 01:19:59.360
 of those circumstances are just individual conversations and we'd be happy to talk to them

01:19:59.360 --> 01:20:07.040
 absolutely no absolutely talk are you sorry for if i make a comment or question

01:20:08.560 --> 01:20:14.080
 in previous bond packages we've shown where dollars were being spent by district is that

01:20:14.080 --> 01:20:19.600
 something you could bring back next week's meeting sure that way i think would help answer

01:20:19.600 --> 01:20:25.600
 some questions yeah the other question i had earlier is could you explain what's going to

01:20:25.600 --> 01:20:31.280
 happen to locust and elm because i feel like that's something that we're we're not seeing

01:20:31.280 --> 01:20:38.480
 but it's going to have a significant impact on that area of town sure so so locust and elm so

01:20:38.480 --> 01:20:43.520
 eagle is down this way on this map and you got locust and elm going north and south we're redoing

01:20:43.520 --> 01:20:49.280
 all the utilities in that corridor right now so there's a lot of massive drainage infrastructure

01:20:49.280 --> 01:20:54.960
 that has to go in right now and water wastewater infrastructure that is being replaced those items

01:20:54.960 --> 01:21:00.640
 are actually under construction now they've just gotten started with the relocation of the franchise

01:21:00.640 --> 01:21:05.280
 utilities so we've we've already had a couple of times we've had to close a couple of roadways

01:21:05.280 --> 01:21:12.480
 because we found a gas line we didn't know was there so we're working that area ahead of tex dot

01:21:12.480 --> 01:21:16.720
 coming in as soon as we relocate those utilities tex dot will come in and they will reconstruct

01:21:16.720 --> 01:21:21.120
 elm and locust and they're not just starting going to the downtown area they're going to go

01:21:21.120 --> 01:21:27.040
 all the way up to university drive upon completion of that project so we have an add-on to what's

01:21:27.040 --> 01:21:31.760
 going on here on the south side of downtown we're also going to be going to the north side for about

01:21:31.760 --> 01:21:36.400
 90 through the plans on that one where we'll be relocating all the utilities and providing drainage

01:21:36.400 --> 01:21:42.640
 infrastructure there with tex dot coming in right behind us as quickly as I can to repave all those

01:21:42.640 --> 01:21:50.240
 roadways so utility reconstruction will last into next year roadway will start to get reconstructed

01:21:50.240 --> 01:21:55.280
 through probably towards the end of next summer provided that the weather works with us and we're

01:21:55.280 --> 01:22:00.560
 not fighting the weather like we have been they'll start repaving locust they'll work north university

01:22:00.560 --> 01:22:05.760
 drive about that time we'll finish up utilities on elm and they'll turn around and they'll repave elm

01:22:05.760 --> 01:22:09.600
 once both things are done then they will turn both those roads over to the city

01:22:09.600 --> 01:22:16.000
 and they will become city roads for us to work with long term currently right now where we are is

01:22:16.000 --> 01:22:20.640
 everything we want to do within that right away whether it's parking whether it's sidewalks it's

01:22:20.640 --> 01:22:25.440
 drainage infrastructure other utilities we have to work with tex dot and get a permit or special

01:22:25.440 --> 01:22:31.520
 permission to be in that area to do work going forward we'll have much greater control over our

01:22:31.520 --> 01:22:38.160
 own destiny throughout the core of our town so what are the plans for robertson street robertson

01:22:38.160 --> 01:22:44.000
 so you can see several areas on robertson where we've already gone through and taken a look at

01:22:44.000 --> 01:22:49.520
 there is a segment that is a full reconstruction what's not on here is because it's a gis map it

01:22:49.520 --> 01:22:54.160
 likes to draw from this point to this point the reconstruction of robertson actually extends

01:22:54.160 --> 01:22:58.560
 further both directions because that's where utility lines will get torn up so we'll take

01:22:58.560 --> 01:23:02.720
 all those utility lines up and then we'll repay that entire roadway rebuild it from bottom up

01:23:02.720 --> 01:23:08.240
 and then other parts of robertson where the utilities aren't but the roadway still needs

01:23:08.240 --> 01:23:14.000
 that kind of attention we'll do either mill and overlay or we'll also or we'll do the other just

01:23:14.000 --> 01:23:19.680
 surface treatment so much of what we're doing throughout the city is also reflected in and

01:23:19.680 --> 01:23:25.440
 danny knows a lot more than he's engrossed in something but danny has a truck that's

01:23:25.440 --> 01:23:29.360
 going to come throughout the entire city of denton later this fall and that vehicle

01:23:29.360 --> 01:23:34.400
 assesses the pavement its quality its condition it double checks these ocis that we've presented

01:23:34.400 --> 01:23:39.840
 earlier what kind of condition are they in and it is across the city what we're actually going

01:23:39.840 --> 01:23:44.560
 to have is more streets than we had from the previous one because there's been so much

01:23:44.560 --> 01:23:49.440
 development in the interim since 2015 when the last survey was done so we'll get a chance to

01:23:49.440 --> 01:23:54.960
 double check how right we are on where that oci is and it may change some of this some of that

01:23:54.960 --> 01:24:09.200
 reconstruction may evolve yes darling would you say that 70 million dollars is this to be david or no

01:24:09.200 --> 01:24:18.640
 is is it are we at where you wanted me to look yes oh okay because i'm not seeing it add up to

01:24:18.640 --> 01:24:29.760
 70 million it's only like i did um it's only saying 26.1 million so 70 million it encompasses

01:24:29.760 --> 01:24:35.120
 the entire city so a few weeks back and i don't know if we still have a map up here okay i don't

01:24:35.120 --> 01:24:44.960
 see it uh we showed a map of the entire city and their ocis so that 70 million addresses three

01:24:44.960 --> 01:24:48.960
 neighborhoods or four neighborhoods three neighborhoods including southeast denton

01:24:48.960 --> 01:24:55.760
 where it's ocis that are greater than 20 because we want to address the entire neighborhood at one

01:24:55.760 --> 01:25:00.400
 time instead of what we've done in the past whereas you know we we worked here we worked there we went

01:25:00.400 --> 01:25:03.840
 over here and we went down here and we didn't connect the dots in between so now you got

01:25:03.840 --> 01:25:07.920
 neighbors who are extremely frustrated that well you were here then you went over here then you

01:25:07.920 --> 01:25:11.120
 disappeared for two or three years and now you came back and you're in my front yard again

01:25:11.680 --> 01:25:16.000
 what's going on so we're trying to put together a much better program to say if i'm going to be in

01:25:16.000 --> 01:25:20.160
 the neighborhood i'm going to do the whole neighborhood at one time all utilities all

01:25:20.160 --> 01:25:25.520
 infrastructure done not have to come back but for minor maintenance over the next 30 to 40 years

01:25:25.520 --> 01:25:29.920
 so that's the goal that's across the city regardless of where you are

01:25:29.920 --> 01:25:36.800
 now the problem we have is is if i just isolate those three neighborhoods that's about 35 million

01:25:36.800 --> 01:25:42.160
 dollars worth of roadway work between those three neighborhoods when you expand that to the water

01:25:42.160 --> 01:25:48.960
 wastewater infrastructure that almost doubles the cost the entire 70 million is citywide so we've

01:25:48.960 --> 01:25:54.320
 isolated three neighborhoods and said okay we're going to do those regardless of what the oci is

01:25:54.320 --> 01:26:01.920
 if it tells us if anything from a 45 oci and below tells us that needs to be totally reconstructed

01:26:01.920 --> 01:26:09.040
 foundation up so those three neighborhoods would get that and then we would be looking at the

01:26:09.040 --> 01:26:14.160
 remainder of the city's roadways that are under a 20 oci which means they're degrading rapidly

01:26:14.160 --> 01:26:20.880
 so those roadways across the city would also get that pick and choose kind of methodology that was

01:26:20.880 --> 01:26:25.200
 involved in the previous bond programs where we'd go hit this one and go hit that one and do this one

01:26:25.200 --> 01:26:31.120
 and just all over the city that's where the other 35 million comes from so across the board we're

01:26:31.120 --> 01:26:37.440
 taking care of all of the streets in the city of denton that have an oci of 20 or less and then

01:26:37.440 --> 01:26:41.920
 we're targeting these neighborhoods because overall these three neighborhoods are in the worst overall

01:26:41.920 --> 01:26:45.840
 condition and doing those three neighbors so we don't have to come back other than maintenance

01:26:45.840 --> 01:26:53.600
 we don't have to come back and redo that sooner did you find it you knew the date and everything

01:26:53.600 --> 01:26:56.800
 of course you did

01:27:01.120 --> 01:27:12.560
 yes okay perfect

01:27:12.560 --> 01:27:21.040
 so you can see these one of the options that we presented on the 20th was multiple options

01:27:21.040 --> 01:27:25.440
 for how you reconstruct streets throughout the city and how much do you want to go i mean that's

01:27:25.440 --> 01:27:29.760
 that's another option that you all have is how much do you want to recommend to council

01:27:29.760 --> 01:27:36.160
 that we incorporate into just this segment of the of the roadway pond so one of the options was in

01:27:36.160 --> 01:27:42.160
 the past we had done that kind of shotgun approach right we just wherever it was the lowest oci we

01:27:42.160 --> 01:27:45.680
 went and did that and cut it off at a dollar amount and that's as far as we're going to go

01:27:45.680 --> 01:27:51.360
 and that presented the problems that we're still working through today so staff's recommendation

01:27:51.360 --> 01:27:57.440
 was that we go with a more of a hybrid approach between the two whereas that is we took the the

01:27:57.440 --> 01:28:03.680
 seven different neighborhoods throughout the city that had the lowest overall oci and then we were

01:28:03.680 --> 01:28:08.960
 looking at those to how far could those dollars go so if you did just those seven neighborhoods

01:28:08.960 --> 01:28:14.000
 and didn't focus on any other street in the city you're at about 70 million dollars in roadway

01:28:14.000 --> 01:28:20.240
 costs for all seven neighborhoods now the problem with that is that neglects a lot of roadways

01:28:20.240 --> 01:28:26.160
 throughout the rest of the city that are at a 20 oci and lower some of those are in those more

01:28:26.160 --> 01:28:30.000
 rural neighborhoods just on the border of the town some of them are in the older parts of the

01:28:30.000 --> 01:28:35.840
 of the city where this roads have just been there for a long time without enough attention so those

01:28:35.840 --> 01:28:41.600
 roadways would get neglected and they would just continue to degrade to the point where it would be

01:28:41.600 --> 01:28:47.120
 just that much more expensive to redo those roads five or six years from now when another bond

01:28:47.120 --> 01:28:54.720
 program might become the next option where we went with this as a staff was to come back and say

01:28:55.280 --> 01:29:01.040
 let's propose a hybrid scenario where we take three neighborhoods or four whatever we could

01:29:01.040 --> 01:29:08.240
 really work into a 70 million dollar focus on local streets work those three neighborhoods

01:29:08.240 --> 01:29:15.680
 and again we chose those these right these over here these numbers were not by priority of worst

01:29:15.680 --> 01:29:20.080
 while they were was just when we drew the map somebody said that's one two three and that's

01:29:20.080 --> 01:29:25.600
 where it came from so if you actually looked at the overall ocis these three were the lowest ocis

01:29:25.600 --> 01:29:34.160
 in it as far as a neighborhood overall oci then when you combine that with the 20 and under oci

01:29:34.160 --> 01:29:39.840
 street so those roads that have a health score of 20 or less that would round out to another

01:29:39.840 --> 01:29:47.520
 30 million dollars so between these three we got to 70 million dollars in total expenses to read

01:29:47.520 --> 01:29:54.000
 to read reconstruct those roadways so the 70 million for just southeast end you're right it

01:29:54.000 --> 01:29:59.680
 doesn't equate because it is one component of the entire city that extends all the way out to its

01:29:59.680 --> 01:30:06.240
 city limits thanks you know probably need that slide later on

01:30:06.240 --> 01:30:14.240
 all right any other comments questions on southeast end

01:30:16.880 --> 01:30:18.240
 okay do we all move on to mckinney

01:30:18.240 --> 01:30:23.680
 thanks i appreciate that

01:30:23.680 --> 01:30:32.800
 so last meeting we had some questions about mckinney and what it would cost to extend mckinney even

01:30:32.800 --> 01:30:40.400
 further into the downtown area which we had also addressed we're working everything east of loop 288

01:30:40.400 --> 01:30:46.400
 because that's where the dollars we have currently funded we can reconstruct that piece of mckinney

01:30:46.400 --> 01:30:52.480
 with the dollars available the problem that we have is when you bring loop 280 in 288 or go from

01:30:52.480 --> 01:30:59.200
 loop 288 all the way over to woodrow the cost to rebuild that roadway today if we had dollars today

01:30:59.200 --> 01:31:06.720
 would be roughly 22 million just in construction for that roadway now when i show this 53 million

01:31:06.720 --> 01:31:11.680
 dollar number down here that's a lot of other things thrown into it that's an assumption that

01:31:11.680 --> 01:31:16.320
 we wouldn't get to the constraint the actual construction of that for another 42 months if you

01:31:16.320 --> 01:31:22.560
 gave me the dollars today so we've inflated that one percent per month over 42 months if you roll

01:31:22.560 --> 01:31:28.000
 that back let's say i got construction i got construction dollars or approval to go to

01:31:28.000 --> 01:31:32.480
 construction next year because it would take me at least a year to acquire all the rightaways at a

01:31:32.480 --> 01:31:36.720
 minimum all the properties that we would need to get the right away full width all the way to woodrow

01:31:37.280 --> 01:31:42.720
 it would take me a year at a minimum i'm going to add roughly three million dollars to that overall

01:31:42.720 --> 01:31:50.320
 construction cost is that if you look at an annual rate one percent per month localized in the economy

01:31:50.320 --> 01:31:55.600
 again we kind of talked about that before the inflational rate locally is roughly one percent

01:31:55.600 --> 01:32:02.000
 per month that equates out to 12 and a half to 12.7 percent annually in total growth of the

01:32:02.000 --> 01:32:08.000
 construction cost on just a one-year basis so one year out i'd be looking at adding roughly three

01:32:08.000 --> 01:32:14.240
 million dollars to that construction cost then you add in the right away acquisition cost of about

01:32:14.240 --> 01:32:18.720
 six million dollars that's an estimated cost there's nothing more than us having taken a good

01:32:18.720 --> 01:32:25.680
 estimated you know a pretty good educated guess at it that's where we see that right away expense

01:32:25.680 --> 01:32:31.920
 going once you start rolling in design costs as well as other factors that go into it staff time

01:32:32.320 --> 01:32:39.120
 the variety of other expenses that go into just delivering a project qaqc survey geotech all the

01:32:39.120 --> 01:32:45.120
 other items that's where you come up with roughly a 53 million dollar price tag to get this particular

01:32:45.120 --> 01:32:55.520
 roadway in from loop 288 over to woodrow lane now there are some options yes ma'am so

01:32:59.120 --> 01:33:06.240
 sorry i didn't realize i sounded so bad so in general what you're seeing here is

01:33:06.240 --> 01:33:11.120
 what we'll still work to try to get additional funding from cog or some other players to make

01:33:11.120 --> 01:33:16.640
 this work part of what we're also up against is when we go to the regional transportation council

01:33:16.640 --> 01:33:22.720
 which is a council a subcommittee basically the national of the north central texas council of

01:33:22.720 --> 01:33:27.920
 governments our metropolitan planning organization they they govern a lot of funding sources and

01:33:27.920 --> 01:33:33.120
 avenues to funding that's where we're getting money for hickory creek for bonnie bray several

01:33:33.120 --> 01:33:38.080
 other projects that we currently have like mayhill uh the southern end of bonnie bray mckinney right

01:33:38.080 --> 01:33:44.000
 now they all funded those projects part of where their concern is is until you come up with a plan

01:33:44.000 --> 01:33:48.400
 and you give me a timeline to actually require the right away because that's not going to be

01:33:48.400 --> 01:33:51.120
 something they're going to throw money in for there'd be something we would have to find

01:33:51.120 --> 01:33:56.640
 when you have all those items lined up and i can see your path to completion

01:33:56.640 --> 01:34:01.520
 then i might consider it but they're also waiting to see if we actually do what we say we're going

01:34:01.520 --> 01:34:08.880
 to do on mckinney east of loop 288 because east of loop 288 they were they were we were getting

01:34:08.880 --> 01:34:13.200
 close to the point where they were going to pull that funding back and they had the authority to

01:34:13.200 --> 01:34:19.680
 do that there was a 10-year window for those dollars to be spent on construction and we were

01:34:19.680 --> 01:34:24.800
 right up against that window all the way up to was it september of this year so september of this

01:34:24.800 --> 01:34:32.080
 year so we we beat that and started construction earlier this year but right now what there's what

01:34:32.080 --> 01:34:37.120
 we're hearing just the rumblings in the background is i want to see you get this done before you start

01:34:37.120 --> 01:34:40.880
 coming and asking me for more money out here they're not saying they won't but before they

01:34:40.880 --> 01:34:45.360
 commit to that because this is all the other cities in the north central texas area that are

01:34:45.360 --> 01:34:51.120
 a member of cog those groups are the same groups we got to go to bat with other folks to get the

01:34:51.120 --> 01:34:56.000
 this kind of funding so we're competing with them they also have to be able to say because each city

01:34:56.000 --> 01:35:02.240
 or large area because some areas compromise comprise multiple cities just because their

01:35:02.240 --> 01:35:08.080
 communities are smaller they have a vote at the table on this council and they get to steer where

01:35:08.080 --> 01:35:14.080
 that money goes so we definitely want to have projects that are valid ready to go so that we

01:35:14.080 --> 01:35:19.760
 stand up against everybody else so that's where we are with mckinney as we look for where we go in

01:35:19.760 --> 01:35:24.400
 the future it's absolutely on the radar we don't know that right now is where we can actually

01:35:24.400 --> 01:35:27.200
 capitalize on getting those dollars to go as far as we can

01:35:27.200 --> 01:35:39.360
 any questions i think my only question i guess would be um i did believe that state had most of

01:35:39.360 --> 01:35:50.000
 right away for a lot of that in their acquisition you say this is the ls e are worse so it's as far

01:35:50.000 --> 01:35:54.000
 as all the streets you brought to our attention is this the worst one because it seems like you've

01:35:54.000 --> 01:36:00.480
 been talking these a lot this is me these are what our current estimates are at the intersections

01:36:00.480 --> 01:36:06.480
 yeah so at the ends of the roadway where i basically have to construct my staff hates me

01:36:06.480 --> 01:36:09.760
 hearing me say this especially the traffic engineers we're constructing parking lots to

01:36:09.760 --> 01:36:16.320
 handle the traffic signal so i put it on red you got a parking somewhere but when you get to that

01:36:16.320 --> 01:36:21.520
 point i'm at a level of service e throughout this quarter but especially at the two signals on both

01:36:21.520 --> 01:36:27.440
 ends so a lot of that is the functionality of what the actual intersection is doing so part of these

01:36:27.440 --> 01:36:31.520
 projects would be upgrading the intersection significantly to the point where we don't have

01:36:31.520 --> 01:36:39.680
 that control problem okay but it is the worst street you presented to us as far as the intersections

01:36:39.680 --> 01:36:44.720
 involves operationally yes i wanted to clarify that because that's what i've been saying this

01:36:44.720 --> 01:36:49.120
 whole time and that's why i was really concerned that you didn't want to bring that to the committee

01:36:49.120 --> 01:36:55.920
 no it was no it wasn't that i mean the the reality of that roadway is the funding constraints

01:36:55.920 --> 01:37:00.160
 are a little tighter on that roadway than what we could get for other places because the other

01:37:00.160 --> 01:37:06.080
 places they have a regional connection that really speaks to the regional transportation council

01:37:06.080 --> 01:37:11.200
 where they're very interested in putting that that same amount of dollars they'll go a lot

01:37:11.200 --> 01:37:16.480
 further with it because there is that impact and when you're having to work with multiple other

01:37:16.480 --> 01:37:21.360
 cities and communities and agencies that are tied into that same council and they have a vote

01:37:21.360 --> 01:37:27.120
 it's where is that council really going to let us go one of the issues that we have here with this

01:37:27.120 --> 01:37:35.280
 roadway is you have constraints at the intersections today the limit for future capacity i have to get

01:37:35.280 --> 01:37:39.360
 into it with pre-tem i'm not going to make a presumption but its growth is is not the same

01:37:39.360 --> 01:37:43.840
 as what you're going to see down south so just because we see a level of service d today does

01:37:43.840 --> 01:37:48.560
 not mean that's what we're going to see 20 years from now 10 years from now i mean you have a lot

01:37:48.560 --> 01:37:54.400
 of development coming so we can choose to do one of two things we can react to the realities of today

01:37:55.360 --> 01:37:58.560
 and then we hear a lot of what we're hearing today in the public which is there's a lot of

01:37:58.560 --> 01:38:03.760
 construction going on and you're tearing up my roadway i'm having to fight around that construction

01:38:03.760 --> 01:38:10.720
 or we can elect to look forward as strategically as possible and get ahead of it when now i don't have

01:38:10.720 --> 01:38:17.200
 the same constraint but i can see what's coming and that's what we see in these areas hickory creek

01:38:17.200 --> 01:38:22.400
 one of the biggest issues you have with hickory creek is when that road is widened then concerns

01:38:22.400 --> 01:38:27.200
 we heard some concerns tonight about ryan and hobson some other roadways it allows those people

01:38:27.200 --> 01:38:32.560
 who are absolutely using those roadways to go north to make a connection to come back south

01:38:32.560 --> 01:38:37.760
 they they go straight south to hickory creek and they go to the sides and do where they need to go

01:38:37.760 --> 01:38:43.360
 that's where we see the long-term benefit of that roadway versus a mckinney that's fairly landlocked

01:38:43.360 --> 01:38:46.400
 a lot of the development already is what it is

01:38:49.280 --> 01:38:54.960
 i mean and i agree and disagree but there's there's a lot of land south of mckinney that's

01:38:54.960 --> 01:38:58.640
 going to be developed and there's a huge apartment complex going on probably i have to have an

01:38:58.640 --> 01:39:06.800
 intersection it's kind of signal light there but it's there's just state actually has it designed

01:39:06.800 --> 01:39:11.680
 to be six lanes so that was why i'm surprised the city is backing it down a lot of the reasons why

01:39:11.680 --> 01:39:15.840
 the state had that designed at six lanes is there were some other things that were also considering

01:39:15.840 --> 01:39:20.240
 your long-term planning they didn't have a expanded mayhill when they were looking at

01:39:20.240 --> 01:39:25.920
 it as a six lane facility they had a lot of other things plugged in that were just hey this is what

01:39:25.920 --> 01:39:30.800
 it is and it's not going to get any bigger there's no other connections coming that was what their

01:39:30.800 --> 01:39:36.400
 plan was at the time now even they look at go back and relook at this thing periodically to make sure

01:39:36.400 --> 01:39:40.960
 that hey long-term projections change i mean roadways that we thought years ago would have needed

01:39:40.960 --> 01:39:45.680
 to be six lanes you look at it now and it really needs to be two to three lanes other roadways

01:39:45.680 --> 01:39:52.160
 that we thought long term would be two lanes they're now needing to be today six lanes so is

01:39:52.160 --> 01:39:58.000
 this a project that you are recommending beyond a bond five years from now is that what you're

01:39:58.000 --> 01:40:05.120
 where we are right now yes and you're hoping by then you'll have but i i will tell you this that

01:40:05.120 --> 01:40:13.440
 is also the that is what this body is for if if you guys want to push that into this mix then

01:40:13.440 --> 01:40:18.400
 absolutely that's a recommendation you can make i agree it's a roadway that at some point

01:40:18.400 --> 01:40:24.080
 absolutely needs to be done and that's something that you can recommend as a body to change into

01:40:24.080 --> 01:40:32.480
 this mix of priorities i don't think i have any questions thank you yeah i have a question so how

01:40:32.480 --> 01:40:37.280
 long is the construction of the east side of the thing going to take and is there anything we could

01:40:37.280 --> 01:40:43.680
 do in this bond package that doesn't fully fund it but maybe get it ready for you know however

01:40:43.680 --> 01:40:50.960
 long it takes to finish the east side or we can make a serious push to or can you pull the

01:40:50.960 --> 01:40:58.320
 microphones here say it again so your question my question was twofold how long is the construction

01:40:58.320 --> 01:41:05.760
 green light there it is how long is the construction on the east side of mckinney going to take

01:41:05.760 --> 01:41:12.800
 and is there anything that we can do that would make us in a better position to petition the cog

01:41:12.800 --> 01:41:18.640
 whenever that is complete in this bond without fully funding it so that that's an ongoing concern

01:41:18.640 --> 01:41:25.360
 that we have you know some of the concerns i've heard about how would you fund growth to the south

01:41:25.360 --> 01:41:31.360
 of mckinney well some of that would come back through other avenues whether it's sir uh roadway

01:41:31.360 --> 01:41:36.800
 impact fees that would be required by the development to pay that as well as a perimeter

01:41:36.800 --> 01:41:41.440
 street requirement the city currently has that they provide the perimeter streets or at least

01:41:41.440 --> 01:41:45.920
 half of the perimeter streets when they put in their development along with other things we are

01:41:45.920 --> 01:41:51.200
 currently designing 30 up to 30 percent designed that mckinney street all the way at the carol

01:41:51.200 --> 01:41:56.320
 boulevard well beyond woodrow just for exactly what you're talking about when those opportunities

01:41:56.320 --> 01:42:00.880
 present to be able to capitalize on those as quickly as possible there are some other avenues

01:42:00.880 --> 01:42:05.360
 that we're we're looking at as well which would be federal funding some other projects that would

01:42:05.360 --> 01:42:11.200
 help to push this along even further so we're looking at all of our options i don't want to

01:42:11.200 --> 01:42:17.840
 sit on this project for five years absolutely not but the reality is we've got to explore all of our

01:42:17.840 --> 01:42:23.520
 options and right now the outlook is we could get more funding quicker by not going the route

01:42:23.520 --> 01:42:29.440
 of rtr funds or some of the other funds that would commit itself we'd be looking at some federal

01:42:29.440 --> 01:42:34.400
 dollars and some other avenues plus allowing the development community to pay their way into this

01:42:34.400 --> 01:42:39.600
 so we are doing the design work now and i answer your first question about the length of time that

01:42:39.600 --> 01:42:44.720
 east the east half or the east side of mckinney is going to be under construction or under

01:42:44.720 --> 01:42:50.160
 construction now you're looking at roughly two years of construction until it's complete thank you

01:42:52.720 --> 01:43:03.200
 diane when we had a chat at paul's town hall i asked what it would take

01:43:03.200 --> 01:43:11.280
 for five years and you said 300 million so going forward to the next five years if we if we fund

01:43:11.280 --> 01:43:16.960
 this very worthy project in with our bond how many more bonds is the city going to have to present

01:43:16.960 --> 01:43:21.680
 uh going forward five years are we going to have to do one every year do you think

01:43:22.400 --> 01:43:27.920
 we can't i mean just talk to david about that one he's he's the finance guy i just know how

01:43:27.920 --> 01:43:36.320
 to spend it he's the one who finds the money i just spend it so no i'm saying that facetiously

01:43:36.320 --> 01:43:40.720
 you know i'm very cognizant i live here and i pay taxes here as well so i'm very cognizant about

01:43:40.720 --> 01:43:47.040
 where those dollars go one of the concerns that we have going forward is is it's really up to

01:43:47.040 --> 01:43:53.280
 the citizens of dentin how far do you want to go which is why i'm asking so so if we if we could

01:43:53.280 --> 01:43:59.520
 put it into a pretty package with a bow because so far i have not heard how much our taxes would go

01:43:59.520 --> 01:44:07.680
 up a year my my my weird little attorney friend who loves numbers said oh let me crunch it and

01:44:07.680 --> 01:44:17.680
 so we're looking at maybe 60 to 80 right so um i think this might be the easiest way to show it

01:44:17.680 --> 01:44:25.360
 so right now we're looking at a four cent uh four cents max debt rate that service tax rate

01:44:25.360 --> 01:44:30.160
 increase on a hundred thousand dollar home that's forty dollars a year so a two hundred thousand

01:44:30.160 --> 01:44:34.960
 dollar home is eighty dollars a year our average home close to two hundred fifty thousand dollars

01:44:34.960 --> 01:44:40.320
 would be you know a hundred dollars a year yeah which which is almost nothing you know in the

01:44:40.320 --> 01:44:46.560
 grand scheme oh nobody nobody be annoyed that i just said that by the way because where i'm going

01:44:46.560 --> 01:44:53.600
 is i've been here 10 years i've been in denton county 30 years and i know the numbers for the

01:44:53.600 --> 01:44:59.520
 county because of certain experiences i had last year so i know what the projected growth is here

01:45:00.160 --> 01:45:06.960
 and and it's it's going to come whether whether we like it or not so this isn't the only

01:45:06.960 --> 01:45:11.840
 other project you have that you'd like to have rolled in to this bond correct

01:45:11.840 --> 01:45:21.040
 it's okay time from an engineer's perspective i would love to go build all of it there you go

01:45:21.040 --> 01:45:27.280
 that's what i want 100 i would love to go do it tomorrow the realities of both the marketplace

01:45:27.280 --> 01:45:32.720
 the availability of contractors do limit us i know but if you're asking what i would just love to do

01:45:32.720 --> 01:45:38.400
 and i had my wish yes i'd love to go build it all today okay so i'm i'm going to take it from a to

01:45:38.400 --> 01:45:44.720
 z then okay so what would it what would it take to present a bond package to the citizens of denton

01:45:44.720 --> 01:45:53.200
 that would fix our roads bring in lighting i know the crime stats for mayhill now right to protect

01:45:53.200 --> 01:45:59.360
 the citizens of denton ensure their quality of life we're the ones paying the taxes for now

01:45:59.360 --> 01:46:05.840
 and the future tell me how to do it that's your job well that's david's job

01:46:05.840 --> 01:46:17.520
 you know i mean i ultimately that's gonna the conversation on what the total amount of debt

01:46:17.520 --> 01:46:21.200
 that the committee is comfortable with is going to be a conversation for the committee to have

01:46:21.920 --> 01:46:25.840
 obviously the charge from the city council was to come forward with a 210 million dollar

01:46:25.840 --> 01:46:32.800
 program they the the starting point for that was to say what what number can we have to stay under

01:46:32.800 --> 01:46:38.960
 our total tax rate so you know if the desire from the committee was to go over up to whatever number

01:46:38.960 --> 01:46:44.800
 ultimately you want to go up to there would just be the increase over our total tax rate and then

01:46:44.800 --> 01:46:49.760
 the increase over the debt service tax rate but i will point out you know as even when we talk

01:46:49.760 --> 01:46:54.240
 about a four percent tax rate increase as i mentioned earlier that doesn't mean every

01:46:54.240 --> 01:46:58.400
 single year of the program it's going to be a four percent four cent tax rate increase that's just

01:46:58.400 --> 01:47:03.520
 at some at one point during one year based on our current assumptions we may get up to that point

01:47:03.520 --> 01:47:08.960
 so just as a caveat to say it's not like you're going to have the hundred dollars every single

01:47:08.960 --> 01:47:14.080
 year of the program but as far as the total high that we're looking at the total bucket of dollars

01:47:14.080 --> 01:47:18.880
 that's ultimately just a level of of first with the committee for your recommendation to council

01:47:18.880 --> 01:47:24.480
 of what how how large you want to go and council's ultimate decision on what is on the election and

01:47:24.480 --> 01:47:29.280
 then up to the voters on if they're comfortable with going up to that amount in the ensuing tax

01:47:29.280 --> 01:47:35.040
 rate that would be required i've also um i'll get with you todd i've also found some grants

01:47:35.040 --> 01:47:40.560
 that i'll bet you haven't looked at yet okay thank you so much

01:47:43.440 --> 01:47:52.320
 okay any more discussion on uh mckinney or southeast denton i just have one question for

01:47:52.320 --> 01:47:58.240
 todd on mckinney what is it about that section of and this is maybe just a stupid question but

01:47:58.240 --> 01:48:05.040
 that section of mckinney between the loop and woodrow that makes it potentially eligible for

01:48:05.040 --> 01:48:12.400
 cog money how does it meet parameters that well and that's you've hit on a challenge there for us

01:48:12.400 --> 01:48:18.800
 to get to woodrow it has to fall into certain specific categories because it's not tying into

01:48:18.800 --> 01:48:23.040
 a state road from a state road so that's where we've been pushing it all the way over to element

01:48:23.040 --> 01:48:28.240
 locus because right now there's still state roads which would be an even bigger number than what

01:48:28.240 --> 01:48:34.080
 you're seeing here so that's the other challenge is those avenues that we'd be looking at funding

01:48:34.080 --> 01:48:39.840
 from the cog would be more in the way of active transportation some of the sidewalk more sidewalk

01:48:39.840 --> 01:48:44.080
 context-sensitive grants that are out there and it would be cobbling a lot of things together to

01:48:44.080 --> 01:48:49.920
 make it work does that answer your question i was wondering is if i mean if it went on over

01:48:49.920 --> 01:48:56.960
 to element locus you could right see it and that's why we're designing it what's the timeline there

01:48:56.960 --> 01:49:04.640
 would we have taken possession of those two roads before that's the challenge this cog

01:49:04.640 --> 01:49:10.080
 yes most likely yes because at the pace we're going with them and locust we should have those

01:49:10.080 --> 01:49:14.720
 reconstructed in the next two two and a half years about the same time we'd be ready to go to construction

01:49:14.720 --> 01:49:23.200
 i'll render grants on that refund right

01:49:24.800 --> 01:49:40.480
 free you just brought up a point about five years three years whatever it's going to be

01:49:40.480 --> 01:49:46.800
 the whole push to get cogs may be you know a lost cause at that point so we've

01:49:46.800 --> 01:49:52.400
 waited for nothing it costs an increase but when you drive down that road i all the time

01:49:52.400 --> 01:49:58.720
 i always see bicyclists uh people walking and they don't have sidewalks on most of that street

01:49:58.720 --> 01:50:02.800
 true they're on the shoulders and that's that's the challenge for a cog when you're trying to get

01:50:02.800 --> 01:50:09.280
 that kind of money it needs to be connected and it's that whole area has for the cog to really

01:50:09.280 --> 01:50:15.520
 buy into putting that kind of money on it onto a project it has to have been designed which is

01:50:15.520 --> 01:50:21.920
 really my reasoning for saying we shouldn't wait for cogs because by the time you do that we will

01:50:21.920 --> 01:50:26.560
 no longer have 77 so there won't be a connection and cogs probably won't do it so i mean it's

01:50:26.560 --> 01:50:31.440
 for me this section between woodrow and luke 28 is really the important section

01:50:31.440 --> 01:50:36.560
 the other section the city's been putting in sidewalks upgrading the sides i mean i remember

01:50:36.560 --> 01:50:41.280
 we did that four or five years ago so now there's some nice sidewalks over there so i mean it's it's

01:50:41.280 --> 01:50:47.360
 you know could still be improved of course like everything but the really major sections between

01:50:47.360 --> 01:50:55.200
 woodrow and 288 that's the dangerous part um and i would really suggest beyond this one well

01:50:55.200 --> 01:51:05.520
 that's a topic for the next item on the agenda so david and it will move on to item 2c which is

01:51:05.520 --> 01:51:13.360
 report receive report hold discussion and give staff direction regarding um 2019 bond program

01:51:13.360 --> 01:51:24.640
 prioritization so this agenda item is is really an offshoot of the conversation that you just had

01:51:24.640 --> 01:51:30.400
 uh just to give give the committee the first your first opportunity to discuss amongst yourself

01:51:30.400 --> 01:51:37.120
 where you how you prioritize the project um you know in advance of us of the discussion of what

01:51:37.120 --> 01:51:42.400
 is where's the line of what's above the line of a little line uh for whatever the total funding

01:51:42.400 --> 01:51:49.680
 amount is so that's the intent of this of this item prior obviously prior to the meeting today

01:51:49.680 --> 01:51:56.160
 i sent out a um a survey an online survey to everyone to complete um the the intent of that

01:51:56.160 --> 01:52:03.600
 survey was was nothing more than to have to have the following slide that gives everyone a baseline

01:52:03.600 --> 01:52:09.680
 for your discussion it was only meant to enhance your discussion nothing final about the online

01:52:09.680 --> 01:52:16.240
 survey um so we have the results of the survey on the next slide 15 of the 19 members completed

01:52:16.240 --> 01:52:23.200
 the survey as of uh just before the meeting today and obviously the aggregate results of the survey

01:52:23.200 --> 01:52:28.480
 are next we'll make one note uh the only of dollar amount essentially that's not included on the

01:52:28.480 --> 01:52:34.080
 survey was public art uh you know ultimately for the recommendation to council you discussed public

01:52:34.080 --> 01:52:39.440
 art last time that will be a factor in the total amount dollar amount that we look toward so public

01:52:39.440 --> 01:52:43.600
 art is a consideration to take into account as you're considering all the other projects

01:52:43.600 --> 01:52:49.200
 but that wasn't on the survey that was sent out can i ask on the public art

01:52:49.200 --> 01:52:57.280
 we said to stay at two percent and our other alternative is no public art or four percent right

01:52:57.280 --> 01:53:03.280
 those are or or we or four percent we also said you can change the um we could recommend changes

01:53:03.280 --> 01:53:13.280
 to the policy so that really opens up some other options so here are the results of the survey i

01:53:13.280 --> 01:53:18.160
 just want to emphasize the 15 of the 19 this is not the entire committee that that took the survey

01:53:18.160 --> 01:53:25.280
 but um and again just intended to to to enhance your conversation today but you can see the top

01:53:25.280 --> 01:53:29.360
 you know five or six items are the ones that we've been discussing quite a bit uh police station

01:53:29.360 --> 01:53:34.240
 renovation number one fire station eight number two uh then the substation and then you can see

01:53:34.240 --> 01:53:40.240
 the street rehab program uh was the fourth uh highest ranked amongst the committee um and i

01:53:40.240 --> 01:53:44.880
 think as we've had the discussions we've seen the importance importance of that and bonny bray and

01:53:44.880 --> 01:53:51.040
 hickory creek following um and you can see the rest of the items there so again this was um just

01:53:51.040 --> 01:53:56.960
 just an aggregate of the of those who took the survey and um hopefully will help your your

01:53:56.960 --> 01:54:01.840
 prioritization conversation uh i'll kind of open it up to the committee amongst yourself have the

01:54:01.840 --> 01:54:06.320
 discussion obviously we're available for any questions i was just wondering how you got you

01:54:06.320 --> 01:54:12.800
 know the numbers are like everybody's number one got a certain number of yeah yeah it was essentially

01:54:12.800 --> 01:54:17.840
 the the basic survey monkey kind of algorithm and number one got a certain number of points number

01:54:17.840 --> 01:54:21.440
 two got a certain number of points and then there were aggregate points and then it was ranked on

01:54:21.440 --> 01:54:29.760
 this point doesn't add up to 15 in any way right yeah yeah so one question i have for the committee

01:54:29.760 --> 01:54:38.640
 is this these survey results are based on the previous known estimates for the police station

01:54:38.640 --> 01:54:45.840
 renovation and police substation so i think one of the questions we have to ask ourselves knowing

01:54:45.840 --> 01:54:53.680
 what we know today that's new information what are your thoughts on how does that impact the

01:54:53.680 --> 01:55:04.240
 this uh prioritization with these results not not for me that's it you just i agree with you

01:55:04.240 --> 01:55:12.960
 i do i i'm in favor of the police station and the fire department only though i don't know

01:55:12.960 --> 01:55:18.880
 i don't know i just can't do it because i can't see a breakdown for the street rehab program to

01:55:18.880 --> 01:55:26.800
 justify body ray gray and history hickory creek again they're getting more money poured into those

01:55:26.800 --> 01:55:34.480
 streets than everybody else i just i'm not in favor or ryan i don't get it okay um i have a question

01:55:35.200 --> 01:55:46.800
 hickory creek is receiving city funds county funds state funds so if the city does not fund

01:55:46.800 --> 01:55:54.480
 hickory creek creek they've lost everything else right so and is it true for bonnie bray as well

01:55:54.480 --> 01:56:02.720
 yes correct so those two and queen i understand where you're coming from with that but if not

01:56:03.280 --> 01:56:13.280
 funding means that we're losing other funding then that's not good for our city but it shouldn't have

01:56:13.280 --> 01:56:18.400
 been in the first place i don't know what you mean but it shouldn't be in the first place this is

01:56:18.400 --> 01:56:25.280
 three different governmental bodies are deciding local governments municipality local government

01:56:25.280 --> 01:56:31.280
 county and state government but they're the city's requesting help from these different governments

01:56:32.080 --> 01:56:38.080
 to get money and what they should have been trying to do is give money for the underserved

01:56:38.080 --> 01:56:44.720
 they would have definitely poured out more money no the county would not have poured out money for

01:56:44.720 --> 01:56:51.040
 a city in no for a city straight there are 44 cities in denton county and every single one of

01:56:51.040 --> 01:56:58.400
 them would have been asking for it hickory creek road was given out for a particular need that was

01:56:58.400 --> 01:57:04.400
 seen as both municipal and county and that was due to county commissioner hugh colman

01:57:04.400 --> 01:57:11.920
 that was his road money that he put in because of the deaths that occurred on hickory creek

01:57:11.920 --> 01:57:18.400
 and you can go back and look at the discussions on commissioner's court in order to understand

01:57:18.400 --> 01:57:24.560
 why that one in particular now bonnie bray that's a whole other there's a whole lot of other reasons

01:57:24.560 --> 01:57:31.680
 by the way that road construction is interrupting my life right now as i'm trying to get from my

01:57:31.680 --> 01:57:38.560
 house to presbyterian but i'm doing it but it works it's that circle that they're putting in

01:57:38.560 --> 01:57:46.960
 it's a whole lot more that's going on there but one of the things that i think we need to keep in

01:57:46.960 --> 01:57:56.960
 mind is all the other monies that are brought in because the city is considering or is in the

01:57:56.960 --> 01:58:04.720
 process of with these roads and as a committee we need to remember that well it's it's letting you

01:58:04.720 --> 01:58:13.040
 leverage the dollars so you if you can spend 27 million and get 111 million dollars in roads

01:58:13.760 --> 01:58:19.920
 that's pretty good leverage of your money and then that's kind of what pushes those up

01:58:19.920 --> 01:58:29.680
 right absolutely so i i think this is really very helpful to our work um and uh what i would love to

01:58:29.680 --> 01:58:37.600
 see uh perhaps for our next meeting is taking this chart assigning the dollar figure for each piece

01:58:37.600 --> 01:58:43.680
 with a running total in the next column so that we begin to see where those lines might fall

01:58:43.680 --> 01:58:49.440
 i think that will help us get to the decisions that need to be made

01:58:49.440 --> 01:58:58.880
 i i do think that in light of the conversation that it is uh earlier that it is appropriate to

01:58:58.880 --> 01:59:06.160
 put a below the line uh series of things into this that if we want to put below the line mckinney

01:59:06.160 --> 01:59:12.800
 and say okay here's here's 50 million dollars for mckinney that if you want to factor it in this is

01:59:12.800 --> 01:59:18.560
 what it's going to take that number to but but we've got we've got a line here that i think we

01:59:18.560 --> 01:59:24.720
 want to be looking at and then we ask if there's anything that that we want to to move above the

01:59:24.720 --> 01:59:32.240
 line or move below the line we can we can definitely do definitely do that um we need to do it based on

01:59:32.240 --> 01:59:36.480
 this on the rankings that we have here or if there's as a result of this good discussion

01:59:36.480 --> 01:59:39.920
 anything moves around we can we can do that

01:59:39.920 --> 01:59:46.000
 i have a question i wound up going back to the net 2030 plan recently and i was reading through that

01:59:46.000 --> 01:59:52.880
 and uh guys it was i have the page written down at page 173 they were suggesting to include the

01:59:52.880 --> 01:59:57.520
 cost of regular road maintenance and rehabilitation and estimating the cost of building and widening

01:59:57.520 --> 02:00:02.640
 roads can you susan can you move closer to the bike please yes for sure try to say it again

02:00:02.640 --> 02:00:09.680
 so what it said on page 173 of the dent 2030 plan it was you know a suggestion

02:00:09.680 --> 02:00:13.840
 was to include the cost of regular road maintenance and rehabilitation

02:00:13.840 --> 02:00:18.880
 and estimating the cost of building and widening roads is that something that we've been doing

02:00:18.880 --> 02:00:24.640
 i didn't miss that did i uh quite uh some conversations of that offline

02:00:28.080 --> 02:00:34.880
 so let me make sure i just understand where you're going so if you're asking are we factoring in to

02:00:34.880 --> 02:00:39.680
 account that there's an ongoing maintenance piece to every single road that goes into the ground

02:00:39.680 --> 02:00:45.680
 yes that there are growth predictions that's a council work session item that we actually had

02:00:45.680 --> 02:00:51.680
 last year uh some of what diane was talking about earlier the 300 million dollars we had

02:00:51.680 --> 02:00:57.680
 talked to council about was also tied to that as you improve those roadways you would also need to

02:00:57.680 --> 02:01:02.800
 increase the roadway maintenance budget on an annual basis from 15 million to 20 to 25

02:01:02.800 --> 02:01:08.400
 over time as those roadways were rebuilt and we got to the point where we were only ever dealing

02:01:08.400 --> 02:01:14.720
 with 10 of our roads in a reconstructed state instead of 20 to 25 like we are today so that

02:01:14.720 --> 02:01:20.480
 300 million would shoot all those roadways to the point where we only have about 20 to 25 percent

02:01:20.480 --> 02:01:24.160
 roadways to the point where we only have about 10 percent of our roads that are ever in need of

02:01:24.160 --> 02:01:31.680
 reconstruction but it has that associated long-term cost of the overall budget for the street maintenance

02:01:31.680 --> 02:01:36.400
 would continue to go up as those roadways come in and then of course as continued development comes

02:01:36.400 --> 02:01:44.480
 into place those things have to factor into that equation as well but but maintenance is not part

02:01:44.480 --> 02:01:50.400
 of the bond the bond is one time yes it's kind of a separate issue yeah maintenance is really where

02:01:50.400 --> 02:01:55.040
 you see the vast majority of those tax dollars go is into the maintenance it's that recurring cost

02:01:55.040 --> 02:02:01.520
 year over year whereas the bond dollars are that one time completely overhaul it or fix it that we

02:02:01.520 --> 02:02:07.120
 have a a much more robust streets maintenance program like we do currently but we didn't for

02:02:07.120 --> 02:02:16.720
 years then your actual expense over time for reconstructing roadways will go down now inflation

02:02:16.720 --> 02:02:21.360
 and other things will offset some of that but your overall total reconstruction and a bond package

02:02:21.360 --> 02:02:26.000
 would go down if you could hold it in today's dollars at some point you would see more of a

02:02:26.000 --> 02:02:31.840
 steady state provided you didn't have continued growth i guess i guess kind of where my concern

02:02:31.840 --> 02:02:37.200
 has been is kind of and i know we're behind on fixing up our streets it just almost feels like

02:02:37.200 --> 02:02:43.200
 maybe we don't have the money to keep up with what we have so i'm just not sure if we're bringing in

02:02:43.200 --> 02:02:48.400
 enough new revenue to pay for you know future maintenance costs so you know yeah we can build

02:02:48.400 --> 02:02:52.560
 them but will we be able to maintain them further down the line adding more streets to what already

02:02:52.560 --> 02:02:57.920
 looks like a pretty heavy load so the vast majority of our just one thing to consider the vast majority

02:02:57.920 --> 02:03:02.720
 of the lane miles that get added are when these residential neighborhoods come into the city so

02:03:02.720 --> 02:03:07.760
 brand new neighborhoods build more roadway than we build to connect them and really what we're

02:03:07.760 --> 02:03:12.560
 building in these bond packages are those connectors because if we don't then what ends up happening is

02:03:12.560 --> 02:03:16.720
 people go through the neighborhoods and they over utilize that pavement for the same volume of

02:03:16.720 --> 02:03:22.400
 traffic that's trying to get through these level of service e intersections d's and f's we do have

02:03:22.400 --> 02:03:28.960
 some throughout town as well so that traffic just tries to find a different pathway now and you see

02:03:28.960 --> 02:03:33.760
 that especially in in south denton where neighborhoods were utilized as a way of

02:03:33.760 --> 02:03:41.440
 maybe i'll put in a lot of cut through traffic and make it very hard to wind through so that i can

02:03:41.440 --> 02:03:45.920
 keep people from cutting through it's had the reverse effect especially with gps and ways and

02:03:45.920 --> 02:03:49.360
 all these other things that now people use on their phone to say well i don't want to sit at

02:03:49.360 --> 02:03:53.920
 this traffic light because there's a lot of stopping but my gps tells me now i can go through

02:03:53.920 --> 02:03:59.360
 this neighborhood and wind my way all the way over to here i don't live here i just want to get over

02:03:59.360 --> 02:04:05.280
 to here and we see that a lot so what we don't have especially on the south side of town but

02:04:05.280 --> 02:04:09.600
 throughout denton there's a good network of arterials and collector roadways which is what

02:04:09.600 --> 02:04:15.440
 we're talking about with hickory creek and bonnie bray mckinney i mean there's a whole host of

02:04:15.440 --> 02:04:21.840
 roadways beyond just that that tie those together and relieve the parking lot scenario at a red

02:04:21.840 --> 02:04:27.760
 light so that people do stay on those roadways that are built for that traffic and keep them out of

02:04:27.760 --> 02:04:33.440
 our subdivisions so it's as much a safety concern it helps to minimize the total maintenance dollars

02:04:33.440 --> 02:04:38.800
 that goes on the larger portion of our roadways which is in those neighborhoods from just a pure

02:04:38.800 --> 02:04:45.040
 amount of them and localize them onto a select few that collect the vast majority of traffic and

02:04:45.040 --> 02:04:54.080
 put the dollars there does that help yes it does okay okay so one question that came up earlier

02:04:54.080 --> 02:05:00.320
 today is knowing we know now about the police station renovation and the police substation

02:05:00.320 --> 02:05:08.480
 we were given direction of looking at a couple different options 100 million to 210 million

02:05:08.480 --> 02:05:18.400
 dollars so i know we know today about those costs going up i think the question is do we have to look

02:05:18.400 --> 02:05:27.040
 at going to a higher number as an option a 230-ish number and likewise should we look at

02:05:27.040 --> 02:05:35.920
 do we look at something lower in the 180s or 190s realizing you know whatever we just recommend to

02:05:35.920 --> 02:05:42.160
 city council is going to you know if we add 20 million dollars to the package that's about a

02:05:42.160 --> 02:05:52.080
 one and a half cent increase to the overall tax rate for debt service or do we go lower

02:05:52.080 --> 02:06:00.960
 and stay well below that effective tax rate and keep it in the four to three and a half cent

02:06:00.960 --> 02:06:07.200
 you know realize we have to sell this package to the citizens so any discussion on that

02:06:07.200 --> 02:06:16.000
 i would like that this is related but as we look at what we're going to spend we also need to look

02:06:16.000 --> 02:06:23.360
 at how we're going to pay for it and the legislature took a bite out of ways that we used to be able to

02:06:23.360 --> 02:06:31.120
 get creative paying off bonds can you just give us the cliff notes version of that

02:06:31.120 --> 02:06:35.280
 you're talking about the three and a half percent rollback or

02:06:35.280 --> 02:06:42.720
 well yeah and i'm talking about accelerated stripping us of the opportunity to pay off

02:06:42.720 --> 02:06:49.440
 debt early and so refund yeah advanced advanced refundings that is that is just change as we make

02:06:49.440 --> 02:06:56.880
 our do our financial planning that was a part of the 2017 tax law nationwide we no longer can do

02:06:56.880 --> 02:07:01.680
 advanced refunding so that does limit our capabilities when interest rates get low on

02:07:01.680 --> 02:07:05.760
 options we can do to free up some of our debt service so that definitely is something that all

02:07:05.760 --> 02:07:10.000
 cities have been dealing with for the past couple years and will continue to be a constraint on our

02:07:10.000 --> 02:07:14.880
 flexibility in regards to the i'm just assuming you're talking about the three and a half percent

02:07:14.880 --> 02:07:21.040
 rollback that doesn't have a direct impact on the debt service rate because the rollback rate is

02:07:21.040 --> 02:07:27.120
 calculated specifically on our m and o rate our maintenance and operations rate so it does have

02:07:27.120 --> 02:07:31.120
 some knock-on effects obviously with our debt service tax rate on the maintenance that goes

02:07:31.120 --> 02:07:36.080
 along with with some of these projects as we look at a police substation a police station

02:07:36.080 --> 02:07:41.360
 we have other other demands that are that are increasing the amount of officers that we need

02:07:41.360 --> 02:07:45.040
 so there are plenty of discussions that we're going to be having on our m and o rate over the

02:07:45.040 --> 02:07:48.960
 next few years and constraints that the three and a half percent rollback will have on us

02:07:48.960 --> 02:07:52.720
 but the debt that we issue does not have that direct impact because the

02:07:52.720 --> 02:08:01.200
 rollback rate is is directly related to the m and o rate and we also can't refinance like we used to

02:08:07.120 --> 02:08:13.600
 david i think that um it might be good just to mention how much current debt the city has

02:08:13.600 --> 02:08:18.960
 and how much of that will be paid off by the end of this particular package

02:08:18.960 --> 02:08:23.840
 not not not adding new debt but what we currently carry

02:08:23.840 --> 02:08:27.280
 and what the what the payoff will be over the course of the next six years

02:08:36.400 --> 02:08:42.960
 so here's an example of some documentation that that we that we can choose to put forward with

02:08:42.960 --> 02:08:48.640
 our bond program this year this is information that will be required by the legislature at least

02:08:48.640 --> 02:08:53.200
 some version of this this is a draft form that we developed internally in future bond elections

02:08:53.200 --> 02:09:00.240
 by the state this is not we are we do not have to abide by the new legislation with this bond

02:09:00.240 --> 02:09:06.000
 package because we're calling the election before september 1st but it's an example to hit on the

02:09:06.000 --> 02:09:12.800
 question that you asked exactly our total debt service on all of our outstanding debt property

02:09:12.800 --> 02:09:19.280
 tax paid debt is 261 million dollars and that means that's the debt service principal and interest

02:09:19.280 --> 02:09:25.120
 that will pay over the next 20 years to retire all of our all of our debt and you can see here

02:09:25.120 --> 02:09:31.920
 that the amount of debt and interest will will issue with the hundred and 210 million dollar package

02:09:31.920 --> 02:09:41.040
 is about 316 million so those are those are just the total numbers the way that that actually

02:09:41.040 --> 02:09:46.480
 impacts us is right now our debt service on that total debt that we have outstanding for property

02:09:46.480 --> 02:09:53.200
 tax back debt is about 25 million dollars that's what we pay annually in our debt service payments

02:09:53.200 --> 02:09:58.640
 for that debt you can see and this is just our outstanding debt that amount continues to fall

02:09:59.360 --> 02:10:05.040
 each year until we get to that until we get to 20 years out where we retire all of our outstanding

02:10:05.040 --> 02:10:11.280
 debt and ultimately what happens is you know as we get as we start going down and we decrease our

02:10:11.280 --> 02:10:16.400
 debt service payments for our outstanding debt we would then make up that difference and stay

02:10:16.400 --> 02:10:20.720
 about at that 25 million dollar range with the new debt issuances and obviously go a little go

02:10:20.720 --> 02:10:26.560
 above that 25 million dollar range as we talk start talking about the increased debt service tax rate

02:10:27.520 --> 02:10:32.480
 but i think one of the things that we heard was that by at that six years from now of the existing

02:10:32.480 --> 02:10:38.080
 debt about 98 million would be paid off over the course of the next six years over the course of

02:10:38.080 --> 02:10:42.880
 the next year so about 98 million dollars paid off in six years and then the important follow

02:10:42.880 --> 02:10:49.200
 on to that is the the entire 210 million dollars obviously is not going to be issued the first year

02:10:49.200 --> 02:10:53.920
 it's going to be issued gradually so you're going to have 98 over six years 98 million dollars

02:10:53.920 --> 02:10:59.040
 gradually coming off of our debt service payments and then we'll be adding that 210 million dollars

02:10:59.040 --> 02:11:06.320
 in total issuance over those six years as well so that's why it's not all just doubling our total

02:11:06.320 --> 02:11:11.600
 debt uh debt service is not doubling it's it's a gradual effect that keeps us around our debt

02:11:11.600 --> 02:11:16.640
 service tax uh total debt service tax so it's a great point when considering our total bond issuance

02:11:20.240 --> 02:11:31.600
 that clear to everyone yeah we we've asked david to come back next time showing maybe a third color

02:11:31.600 --> 02:11:38.800
 what that if you phased in the new debt what that would look like absolutely

02:11:38.800 --> 02:11:46.800
 yes i'll pick a different one than blue and red green another question

02:11:48.000 --> 02:11:52.880
 i'd like to echo mr davis who spoke earlier i've kind of wondered this myself i think i know the

02:11:52.880 --> 02:11:57.040
 answer but i'm going to ask it anyway um so considering that we're currently

02:11:57.040 --> 02:12:01.600
 updating the mobility plan why are we widening streets prior to updating that

02:12:01.600 --> 02:12:15.040
 so there are several things going on all at one time so we did do an area study where we looked

02:12:15.040 --> 02:12:22.640
 at the entire quadrant from 2181 all the way back over to 35w we went from vintage and hobson all

02:12:22.640 --> 02:12:30.800
 the way south to crofford road yeah so we looked at the entire area inclusively because we we knew

02:12:30.800 --> 02:12:35.520
 where that was going and the other thing to consider as well uh i know i heard concerns earlier about

02:12:35.520 --> 02:12:39.520
 well why are you widening a brush creek road when you're getting ready to do a mobility plan update

02:12:40.400 --> 02:12:46.160
 on the current mobility plan brush creek road is a major arterial it's listed that way today that's

02:12:46.160 --> 02:12:50.320
 not going to change the only thing that changes is the connection directly from hickory creek over to

02:12:50.320 --> 02:12:56.240
 brush creek and there are vast majority reasons for that one is it is the shortest distance to

02:12:56.240 --> 02:13:01.840
 span over the floodplain plus that's where the vast majority of development is coming in today

02:13:01.840 --> 02:13:07.760
 i mean we're seeing those act and i think that map is still over here where you can see development

02:13:07.760 --> 02:13:12.720
 coming in and it still doesn't reference developments that are coming in that we are having

02:13:12.720 --> 02:13:17.040
 ongoing meetings with but they just haven't submitted an application so there's development

02:13:17.040 --> 02:13:21.840
 coming into this area that absolutely ties into that and went into that study that projects all

02:13:21.840 --> 02:13:28.720
 the way out to 2040 what does traffic look like so the mobility plan in that area is not going to

02:13:28.720 --> 02:13:34.320
 change dramatically but it does look at our regional partners as well argyle to the south

02:13:34.320 --> 02:13:41.360
 the impacts to crofford road and what they're just able to maintain long term as a city same with the

02:13:41.360 --> 02:13:46.400
 county uh text on as well they're all at the table as we're discussing what does this area look like

02:13:46.400 --> 02:13:51.360
 so this was definitely not done in a vacuum uh the results that are in this area study would also be

02:13:51.360 --> 02:13:55.360
 going into the future mobility study that's currently ongoing it's not like it would be

02:13:55.360 --> 02:13:58.480
 thrown away as a separate study it would be conclusively part of it

02:14:01.920 --> 02:14:07.360
 on that uh on that traffic study you mentioned yes do you happen to know what the projected

02:14:07.360 --> 02:14:11.680
 population is in that south dentin area that the traffic study was based on

02:14:11.680 --> 02:14:18.400
 i can get that for you off the top of my head no i don't it also plugs into some

02:14:18.400 --> 02:14:23.440
 projected development that would be on the west side of i-35w as well and that would be a prime

02:14:23.440 --> 02:14:28.880
 connector in that area too sure we can get that number for you it's in the no that's fine i think

02:14:28.880 --> 02:14:37.360
 what i'm wondering is whether the uh the amount of population that the traffic study is assuming

02:14:37.360 --> 02:14:46.080
 is aligned with the amount of growth that the uh financial projections are doing and that sort

02:14:46.080 --> 02:14:52.800
 of thing or whether those are are disparate so i'd have to get a little bit more finite on your

02:14:52.800 --> 02:14:59.040
 question as far as growth goes i know the projected volumes we use are in line with what the council

02:14:59.040 --> 02:15:04.960
 of governments uses and that has traditionally been very very conservative we typically see growth

02:15:04.960 --> 02:15:10.240
 at a much greater rate than what it actually goes into the study so we're projecting lower

02:15:10.240 --> 02:15:14.880
 than what most likely will happen and much like david was talking about in the future expenses

02:15:14.880 --> 02:15:19.760
 along with debt service and everything else that gets combined it's the same thing where we're

02:15:19.760 --> 02:15:25.600
 trying to project traffic volumes i mean we the studies that we utilize today the growth patterns

02:15:25.600 --> 02:15:29.840
 we're using today are based on what's happened over the last five years we typically update

02:15:29.840 --> 02:15:34.640
 that every five years it could be a little bit longer depending on where you are we're running

02:15:34.640 --> 02:15:39.920
 off of a very conservative estimate but what we have seen over the last 10 to 15 years is that

02:15:39.920 --> 02:15:46.400
 growth rate is faster than what we're actually anticipating so instead of doing what you're

02:15:46.400 --> 02:15:51.680
 absolutely seeing tex dot do right now so they're they're widening roadways after the fact we're

02:15:51.680 --> 02:15:55.600
 trying to be very strategic and that's why we're not saying well let's widen every single road in

02:15:55.600 --> 02:16:00.960
 the city of denton to four lanes we're saying where are those prime drivers where are they coming

02:16:00.960 --> 02:16:08.080
 we're seeing development coming we have to get ahead of it so if i don't know exactly what you're

02:16:08.080 --> 02:16:13.120
 looking for specifically at the moment and i don't know if that's david answering it or me okay

02:16:15.360 --> 02:16:20.160
 i think we can definitely i think we to your point we could bring back and just show in that

02:16:20.160 --> 02:16:24.240
 area what is the growth assumptions in that document and obviously compare them to the

02:16:24.240 --> 02:16:30.480
 growth assumption that we're using for for our total ab and just and see what that is i think

02:16:30.480 --> 02:16:35.520
 the difficulty it's not going to be as precise as we know we don't get with our a rss value projections

02:16:35.520 --> 02:16:40.960
 down to that quadrant but i think we can definitely at least show what they're projecting in that in

02:16:40.960 --> 02:16:46.480
 that area versus our total projections and look at other other factors involved in the plan as well

02:16:46.480 --> 02:16:51.920
 as far as growth compared to what we're projecting yeah i think that would do that my my concern is

02:16:51.920 --> 02:16:57.600
 that if if you overestimate the growth for the traffic needs then you end up overbuilding sooner

02:16:57.600 --> 02:17:04.640
 than you need to to some of the citizen comments earlier and if you uh on the other side if you

02:17:05.280 --> 02:17:12.240
 underestimate or rather if you overestimate how much the assessed value is going to grow compared

02:17:12.240 --> 02:17:17.440
 to the roads then then you run into funding issues so i just want to understand if those are in line

02:17:17.440 --> 02:17:22.160
 with each other we we can definitely do that i would just is not an exact science it won't be

02:17:22.160 --> 02:17:34.320
 question david what is what is the uh the interest rate that's paid on the bonds what

02:17:34.320 --> 02:17:39.360
 is the benchmark rate for that is it based on treasuries or what what what are we kind of

02:17:39.360 --> 02:17:46.240
 looking at for those well it's based so it's right now we have in 2020 a three uh 3.75 interest rate

02:17:46.240 --> 02:17:52.960
 and then 4.5 in the out years 2021 on and it's really just based on our bondage which is right

02:17:52.960 --> 02:17:58.720
 now we have a bond issuance next week um where we're getting very low rates so that's why we

02:17:58.720 --> 02:18:03.840
 kind of we've said okay if we go um just an increase on what we're getting now next year

02:18:03.840 --> 02:18:08.880
 and then from two years two years from now it would be we don't want to we don't want to be

02:18:08.880 --> 02:18:13.120
 too aggressive and think that we're going to keep these low rates we have now over the life of the

02:18:13.120 --> 02:18:18.160
 bonds or the of us selling the bond so that's that's where we are right now but right now

02:18:18.160 --> 02:18:24.400
 for what we're selling next week is even is lower than that 3.75 that was one of my my thoughts about

02:18:24.400 --> 02:18:29.600
 the question that pat had asked is do we want to raise the amount of the bond or lower it

02:18:29.600 --> 02:18:33.920
 my kind of high level thought is you know debt has never been cheaper than it is today

02:18:33.920 --> 02:18:41.600
 costs are going up you know exponentially as time goes on the growth is coming uh highways are being

02:18:41.600 --> 02:18:46.800
 expanded you know outer loops are being proposed so the growth is going to be here whether you know

02:18:46.800 --> 02:18:52.000
 we like it or not and there's no time like the present to fund projects that that you know are

02:18:52.000 --> 02:18:56.800
 cheaper now than they ever will be now i'll just use that as an opportunity also to just kind of

02:18:56.800 --> 02:19:00.720
 reinforce you know when we say 210 million dollars and we estimate when we're going to sell those

02:19:00.720 --> 02:19:06.160
 bonds over six years say our av growth next year is higher than five percent or those interest rates

02:19:06.160 --> 02:19:10.800
 are still even lower than we're projecting it gives us some of that balance to issue more

02:19:10.800 --> 02:19:15.680
 next year depending on the projects and those discussions are we one ones that we have with

02:19:15.680 --> 02:19:25.200
 city council every year as we look to issue debt great point has the city ever considered many bonds

02:19:27.440 --> 02:19:38.560
 um like a large number of bonds no it's actually where the citizens contribute

02:19:38.560 --> 02:19:42.240
 to the bond so they actually fund their own community just like we did in the war bonds

02:19:42.240 --> 02:19:51.920
 i actually did one of those way way back it it's it's kind of fun so that citizens can

02:19:51.920 --> 02:19:58.160
 can change it's a nightmare to manage yes just go out and ask because it seems to be a growing

02:19:58.160 --> 02:20:03.520
 concept across the country again and like i said it's a great i think it's a great way for the

02:20:03.520 --> 02:20:09.600
 citizens to buy in but it's hard to manage i'm i'm not familiar so i can't speak to them right now

02:20:09.600 --> 02:20:20.160
 but we can definitely look into sure yeah it's kind of cool okay any other comments or questions

02:20:20.160 --> 02:20:32.080
 regarding the 230 option or the 180 option the reason i'm i feel like we need to

02:20:32.080 --> 02:20:40.080
 get some you know feedback on that is and thank you nathan is if we're going to give staff

02:20:40.080 --> 02:20:48.080
 direction to bring back some variants of options for us to consider um you know using what tim

02:20:48.080 --> 02:20:55.120
 laid out which i think is prudent i think would be helpful to get a sense are we willing to go

02:20:55.120 --> 02:21:04.720
 above 210 or do we want to stay at 210 can we take a straw bill wait wait wait i'm only kidding

02:21:04.720 --> 02:21:10.000
 no you're only kidding i mean we can i mean we can in the committee we can basically do anything

02:21:10.000 --> 02:21:14.720
 we want until we make our final recommendation and that's you know so yeah we could do a straw

02:21:14.720 --> 02:21:25.440
 bill but my my question is did the council give us a firm number like we should not go above 210

02:21:25.440 --> 02:21:33.040
 or is that something that we in the committee can adjust the the resolution itself forming

02:21:33.040 --> 02:21:38.560
 the committee said to uh to look at a bond package not to exceed 210 million dollars

02:21:38.560 --> 02:21:44.000
 but the um the message that we received from council as we talked through the process was

02:21:44.000 --> 02:21:49.200
 if the committee wanted to go above that there would be that additional step of going back to

02:21:49.200 --> 02:21:53.680
 the the council and asking them to amend the resolution so that would be the mechanism to

02:21:53.680 --> 02:21:59.840
 get there right okay so that that was my question because i couldn't remember what if it was a

02:21:59.840 --> 02:22:06.160
 hard and fast 210 or if it was we'd just have to take that extra step to say hey we've had these

02:22:06.160 --> 02:22:14.320
 discussions because of west mckinney or various other states so southeast dent and do we have

02:22:14.320 --> 02:22:21.280
 the time to take that extra step to go back to council to amend the resolution uh we're very

02:22:21.280 --> 02:22:25.120
 close and like i'm bring up the schedule i can bring it up now or wait till the next item but

02:22:25.120 --> 02:22:29.520
 we're very close on time all the way around if we were going to do that it would be to happen

02:22:29.520 --> 02:22:35.200
 at the next meeting were we also tasked to come up with a 100 million dollar option

02:22:35.920 --> 02:22:40.720
 the the task was to consider 100 million dollar option uh previously we've we've shown kind of

02:22:40.720 --> 02:22:44.320
 what that would look like we can definitely bring that back that could be it's running

02:22:44.320 --> 02:22:48.960
 different scenarios at different amounts is no no problem so we could bring back 100 we could kind

02:22:48.960 --> 02:22:55.280
 of bring say you want that forwardization list we could do 100 150 180 210 as many as you'd like

02:22:55.280 --> 02:23:01.440
 if it would assist your conversation and so the intent of the 100 million dollars that that was

02:23:01.440 --> 02:23:05.920
 derived from saying that would keep us at our effective tax rate throughout the life of the

02:23:05.920 --> 02:23:12.720
 program whereas the 210 would keep us below our total tax rate i think one of the things that

02:23:12.720 --> 02:23:20.240
 might also be helpful to the committee is if we could have some historical data on what previous

02:23:20.240 --> 02:23:30.000
 bonds have uh suggested as the tax rate increase because if we're going to have a bond that is at

02:23:30.960 --> 02:23:37.280
 five cents six cents is what the what that number might be how does that compare with what we've

02:23:37.280 --> 02:23:45.120
 asked for previously um because i that needs to be a factor in terms of our decision of

02:23:45.120 --> 02:23:51.680
 what will the voters support and and there's going to be a there's going to be a pretty

02:23:51.680 --> 02:23:56.960
 important line that we'll have to determine as to what we think the voters will support

02:23:59.680 --> 02:24:04.240
 we can bring that back obviously previously we discussed the three cent that was associated with

02:24:04.240 --> 02:24:11.120
 right i think not only what was asked for what was suggested what actually actually happened

02:24:11.120 --> 02:24:21.840
 did we actually end up raising taxes and and and my only my only differentiation on that is

02:24:21.840 --> 02:24:28.400
 because of when the voters went to vote they were off they were they were going in with a three cent

02:24:28.400 --> 02:24:35.280
 in mind or whatever that number might be we may not have done that but if it was if we're talking

02:24:35.280 --> 02:24:40.080
 about something it might double what we've ever asked for before how will the we i think we have

02:24:40.080 --> 02:24:47.760
 to ask how will the voters respond to that i would also like to see how those items were listed on the

02:24:47.760 --> 02:24:54.640
 ballot how those bond proposals were worded on the ballot along with whatever the numbers are

02:24:56.240 --> 02:25:03.600
 and how we propose i know this one is proposed to be broken down to a certain point it's not just

02:25:03.600 --> 02:25:08.080
 all or nothing right two propositions public safety facilities and roadway infrastructure

02:25:08.080 --> 02:25:13.440
 so in 2012 it was only only a street rehab program so that was just one proposition

02:25:13.440 --> 02:25:18.640
 whereas in 2014 we had four propositions that we've gone through previously in that

02:25:18.640 --> 02:25:23.120
 right here so we can we can bring that back and show you in more detail exactly what the language

02:25:23.120 --> 02:25:29.280
 looked like and just kind of of 2014 we had that three three cent tax increase that we didn't

02:25:29.280 --> 02:25:36.240
 realize because our assessed value came in higher than our anticipations the worst case scenario

02:25:36.240 --> 02:25:42.560
 and in 2005 it was four four cents that we estimated to go to

02:25:42.560 --> 02:25:52.720
 so just to summarize tam asked for historically what we've asked for in the past in terms of tax

02:25:52.720 --> 02:26:00.240
 increase right right and then patty you asked how the exact wording that was used in the previous

02:26:00.240 --> 02:26:06.640
 bond elections and then randy's and then randy what actually happened right yeah right

02:26:06.640 --> 02:26:12.240
 are you so there's a lot of different language you have election ordinances bond language

02:26:12.240 --> 02:26:17.120
 proposition language are you most concerned with the bond language itself i'm i'm interested in

02:26:17.120 --> 02:26:22.720
 what's on the ballot ballot line because that's what john q voter is going to read what we have

02:26:22.720 --> 02:26:32.480
 to sell yeah okay because how things are worded can be very important okay we can bring that back

02:26:32.480 --> 02:26:33.680
 tracy good with all that

02:26:33.680 --> 02:26:39.200
 okay

02:26:39.200 --> 02:26:46.240
 any other army class yeah if i could real quick just get your feedback on something you probably

02:26:46.240 --> 02:26:51.920
 have a window to to get something to the council next tuesday it's gonna be the last time

02:26:51.920 --> 02:26:58.400
 they're gonna meet before you can you meet again and are you wanting us to take a resolution there

02:26:58.400 --> 02:27:03.280
 and get their feedback as to whether the committee should be looking at or is is able to consider

02:27:03.280 --> 02:27:08.320
 something over the 210 because because of the wording of the resolution if so we'll get that

02:27:08.320 --> 02:27:17.040
 done tomorrow but i think to be to do our our duty which is to consider in my opinion to give

02:27:17.040 --> 02:27:23.920
 our law enforcement and fire department the resources maybe do the job we have to at least

02:27:23.920 --> 02:27:30.560
 consider it if we can't if we need a resolution to go above 210 then i think we need to ask

02:27:31.280 --> 02:27:38.160
 for permission to do that yeah will you all agree with that statement anybody disagree we're not not

02:27:38.160 --> 02:27:44.160
 making a recommendation i'm just asking mother may i okay we'll get that handled tomorrow then

02:27:44.160 --> 02:27:50.480
 okay thanks in light of the the new in light of the new figures that have come in i think

02:27:50.480 --> 02:28:00.480
 we would be remiss if we didn't ask to consider more and that already includes the 100 to 210 so

02:28:00.480 --> 02:28:09.200
 the request to go if it's more than 210 that's correct okay great thanks okay

02:28:09.200 --> 02:28:17.680
 all right uh we think we have one more agenda i don't i already have it up based on the discussion

02:28:17.680 --> 02:28:31.200
 so if you want to move over to that agenda so uh next week we have uh more discussion more public

02:28:31.200 --> 02:28:40.160
 comment um earlier today we discussed do we need as a finance task force and everyone's

02:28:40.160 --> 02:28:48.880
 in welcome to attend i will if you show up i will buy you lunch uh well

02:28:48.880 --> 02:28:57.520
 so the question we had earlier today is do we need does that finance task force need to meet again

02:28:57.520 --> 02:29:06.720
 my suspicion at this point is probably not would you all agree and i'm asking the whole committee

02:29:06.720 --> 02:29:13.120
 here you want to i think we're going to get enough information for the full committee to have the

02:29:13.120 --> 02:29:17.040
 conversation we need to have can we all the information discussed earlier i can bring to

02:29:17.040 --> 02:29:24.560
 them okay so six o'clock meeting i just saved you a meeting david i appreciate it um and so we meet

02:29:24.560 --> 02:29:33.040
 the 18th and then the 25th is hard yeah date where we have i think i think we can feel certain we

02:29:33.040 --> 02:29:38.480
 won't have action next week um but i think we'll have a lot of good discussion and then the 25th

02:29:38.480 --> 02:29:47.920
 is really our our hard deadline um to to get to a point of a of a decision so um yeah hopefully we

02:29:47.920 --> 02:29:52.880
 have a good conversation next week to get there okay i would just like to say i i'd like to see

02:29:52.880 --> 02:30:01.760
 us at this next meeting be at a point that we have a preliminary uh plan that we will take final

02:30:01.760 --> 02:30:08.000
 action on on the 25th and i i think we ought to get we ought to attempt at this next meeting to

02:30:08.000 --> 02:30:24.960
 get pretty far down the road to that final decision right so then should then we kind of have a lot on

02:30:24.960 --> 02:30:30.560
 the plate right so i mean if you're not if we're not going to have a task force meeting then

02:30:30.560 --> 02:30:37.040
 should we maybe consider allotting more time or allowing for an earlier start time i mean

02:30:37.040 --> 02:30:45.600
 just the amount of time just a thought any thoughts on that

02:30:45.600 --> 02:30:53.040
 six o'clock is that a hard is there anything early or hard for someone else to make

02:30:55.360 --> 02:31:07.360
 five o'clock you couldn't or could not can you do 530 okay all right 530 would be better all right

02:31:07.360 --> 02:31:17.280
 let's do 530 okay unless you're strongly object to 530 we'll go for 530 great perfect okay all

02:31:17.280 --> 02:31:29.200
 right are we voting on each project individually is that how we're going to do it and say we're

02:31:29.200 --> 02:31:34.560
 going to do this and we're not going to do it because i feel like we need to be going through

02:31:34.560 --> 02:31:39.200
 it like that because well i want to put east bikini on there obviously but i i want to find

02:31:39.200 --> 02:31:44.800
 out maybe ryan for example at the bottom of kind of that list of what people were rating maybe

02:31:44.800 --> 02:31:51.520
 ryan is one that can be removed to put on another project or to keep our costs within a certain

02:31:51.520 --> 02:31:55.600
 budget or thing so that's why i'm wondering that we're doing the next meeting we're going to actually

02:31:55.600 --> 02:32:01.040
 could i if i could speak to that what i think will happen because what if we get the projects

02:32:01.040 --> 02:32:08.800
 with the dollar amounts in the order that we have here then then we see this is where the line is at

02:32:08.800 --> 02:32:15.040
 180 this is the line at 210 230 then we're able to get to exactly what you what you're talking about

02:32:15.040 --> 02:32:21.760
 i don't think we have to necessarily be debating the top items on the on that unless there's some

02:32:21.760 --> 02:32:28.000
 driving reason to do that but we can get to what are the what are the ones that that are above or

02:32:28.000 --> 02:32:35.120
 below the line so with that question can we do one more survey that includes mckinney street

02:32:36.320 --> 02:32:39.680
 i'd like to know kind of kind of where it would rank in the list

02:32:39.680 --> 02:32:44.560
 if the committee would like that i can i can send another survey

02:32:44.560 --> 02:32:59.200
 include what the price amount is yes that that yeah

02:33:06.560 --> 02:33:11.200
 i don't think it's going to change anything but it's okay is that make sure that is everyone

02:33:11.200 --> 02:33:15.920
 comfortable with the way the survey was handled as far as just seeing kind of a summary view not

02:33:15.920 --> 02:33:20.960
 anonymous to some degree obviously when you when you all get together the discussion

02:33:20.960 --> 02:33:29.040
 amongst everyone is open okay great for instance on ryan road there's a range right on ryan road

02:33:29.040 --> 02:33:35.520
 and we didn't really have a chance the way the survey was the last time to you know put ourselves

02:33:35.520 --> 02:33:44.000
 into a range at the four million or the 14 million i could do different amounts four to four to four

02:33:44.000 --> 02:33:49.920
 to eight eight to twelve thank you okay everyone track with what he just said

02:33:49.920 --> 02:34:00.560
 okay all right any other questions comments concerns all right i'll take a motion to adjourn

02:34:02.560 --> 02:34:07.840
 second have a nice evening thanks everyone