 Good evening, welcome to the Planning and Zoning Commission Work Session.

00:00:06.620 --> 00:00:10.640
 I'll open the meeting at 5.04.

00:00:10.640 --> 00:00:15.520
 It is Wednesday, June 5th, 2019.

00:00:15.520 --> 00:00:17.360
 First item of business is to receive a report for

00:00:17.360 --> 00:00:19.880
 the Development Code and City Initiated Rezoning.

00:00:19.880 --> 00:00:22.640
 I think Ron McGuint is here to present.

00:00:30.000 --> 00:00:36.320
 >> There it is, Chair, members of the commission.

00:00:36.320 --> 00:00:40.000
 Appreciate the opportunity.

00:00:40.000 --> 00:00:47.680
 This is a presentation just to prelude to what's going to be coming on the 26th of June,

00:00:47.680 --> 00:00:53.440
 is the next City Initiated Rezoning Group 2 is what I'm referring them to.

00:00:55.320 --> 00:01:02.080
 This is the schedule that we have prepared for the City Initiated Rezoning changes.

00:01:02.080 --> 00:01:06.120
 As you can see, we had our first one on May 29th.

00:01:06.120 --> 00:01:09.320
 It will be going to council next week on June 11th.

00:01:09.320 --> 00:01:15.200
 Again, the next upcoming one for the Planning and Zoning Commission would be June 26th and then July 10th.

00:01:15.200 --> 00:01:21.120
 Just want to give the commission an update.

00:01:21.120 --> 00:01:28.280
 We've been meeting with individual stakeholders, recently Denia Ranch Estates.

00:01:28.280 --> 00:01:35.480
 We will be meeting with UNT and other neighborhoods as we continue through the City Initiated Rezonings.

00:01:35.480 --> 00:01:41.960
 Not only to give them an opportunity to provide their feedback or their input, but just to give them notice.

00:01:41.960 --> 00:01:49.240
 It's one thing to receive a notice in the mail, but to have someone explain to them what's really going on at a meeting is helpful.

00:01:49.240 --> 00:01:54.200
 I had a really good meeting with Ranch Estates on last Thursday.

00:01:54.200 --> 00:02:03.760
 They were given an explanation of what we were doing, and they were very pleased, and we'll see that coming forward on the 26th.

00:02:03.760 --> 00:02:08.480
 And these other neighborhoods, we will be meeting with them as well,

00:02:08.480 --> 00:02:14.480
 as we get through the area, through the corridors, and into the neighborhood compatibility areas.

00:02:16.480 --> 00:02:20.880
 This slide here, just to kind of recap, we did hear 23.

00:02:20.880 --> 00:02:24.200
 We did not hear area nine at our last meeting.

00:02:24.200 --> 00:02:27.120
 That will be brought forward with the next group.

00:02:27.120 --> 00:02:31.960
 All 22 was moved forward by the commission.

00:02:31.960 --> 00:02:36.120
 There was one area that was postponed indefinitely, and that was area eight.

00:02:36.120 --> 00:02:42.400
 So this is the group two area that we're taking.

00:02:42.400 --> 00:02:48.000
 As you can see, it pretty much covers the entire city area.

00:02:48.000 --> 00:02:50.080
 I've got other slides here that zooms in.

00:02:50.080 --> 00:02:51.840
 I apologize for the quality of the image.

00:02:51.840 --> 00:02:54.200
 It's not as clear as I hope.

00:02:54.200 --> 00:03:00.240
 We have approximately 21 areas, 350 parcels with this one group.

00:03:00.240 --> 00:03:07.400
 So the first area that we're going to be referring to is what we call I-35 corridor.

00:03:07.400 --> 00:03:14.360
 Again, includes the area nine that was part of group two, now is part, I'm sorry, group one now is part of group two.

00:03:14.360 --> 00:03:19.160
 We will be taking some areas along I-35 by the university.

00:03:19.160 --> 00:03:23.480
 Those will be going to MR.

00:03:23.480 --> 00:03:27.440
 Moving further north on I-35 by 380,

00:03:27.440 --> 00:03:35.320
 between 380 and Ganser Road, upper area of the city, we will be taking a number of areas, as you can see here.

00:03:35.320 --> 00:03:43.000
 One area including the Ranch Estates development or neighborhood, that is proposed to go to an R1.

00:03:43.000 --> 00:03:48.280
 The others are going to G-O and H-C in the areas that you see here.

00:03:48.280 --> 00:03:55.880
 Another area that we'll be looking at is the loop in 380.

00:03:55.880 --> 00:04:03.440
 The majority of these are going to SC, suburban corridor, primarily because of what arterials they are.

00:04:03.440 --> 00:04:06.200
 That again being the loop and 380.

00:04:06.200 --> 00:04:07.600
 >> Commissioner Beck.

00:04:07.600 --> 00:04:08.560
 >> Thank you, Chair.

00:04:08.560 --> 00:04:11.000
 Is that, what is that, area 37?

00:04:11.000 --> 00:04:12.920
 >> Uh-huh. >> Is that that one that was split in three?

00:04:12.920 --> 00:04:15.000
 >> Correct. >> Separate parcel, and now it's all one?

00:04:15.000 --> 00:04:17.640
 >> It is, yeah, we're- >> It's going to be suburban corridor?

00:04:17.640 --> 00:04:18.960
 >> Correct. >> Okay, great, thanks.

00:04:18.960 --> 00:04:23.680
 >> I think this is the last of the groupings.

00:04:23.680 --> 00:04:27.800
 This is an area on the loop between the loop and Mayhill.

00:04:27.800 --> 00:04:33.000
 There are a number of areas that are zoned now for light industrial.

00:04:33.000 --> 00:04:37.800
 I think that the area is more suitable for general office.

00:04:37.800 --> 00:04:43.600
 And that's what you see here with the pairs between again, loop 288 and I-35.

00:04:43.600 --> 00:04:44.680
 And we'll get into the details.

00:04:44.680 --> 00:04:47.520
 I just want to give you all an idea of what's upcoming.

00:04:47.520 --> 00:04:53.040
 Not only for you to kind of think about, but also if you have a potential conflict of interests.

00:04:53.040 --> 00:05:00.920
 Obviously, we want to make sure that we have you make that announcement in front of consideration of these areas.

00:05:02.160 --> 00:05:08.560
 The majority of these will go from SC, GEO, and the last one would be MR, which is the larger area here.

00:05:08.560 --> 00:05:14.360
 The landfill is in this general vicinity, just kind of give you some orientation of where that area is.

00:05:14.360 --> 00:05:17.000
 And that's pretty much it.

00:05:17.000 --> 00:05:22.360
 We had a way of presenting it last, PNZ.

00:05:22.360 --> 00:05:30.080
 We're working, staff's working on a way of making it a little bit more concise, a little bit more shorter, is probably the better word.

00:05:30.080 --> 00:05:34.680
 So we're acknowledging how we did it last time.

00:05:34.680 --> 00:05:38.720
 And we've learned that that's probably something that we probably need to change.

00:05:38.720 --> 00:05:47.400
 So we're going to group them, as you saw here in this presentation, a little bit more higher level, still covering the necessary information.

00:05:47.400 --> 00:05:52.760
 And then as we have done with the last one, it will be a one consideration,

00:05:52.760 --> 00:05:57.720
 meaning one recommendation from the commission with the next group.

00:05:57.720 --> 00:05:59.720
 So anybody have any questions?

00:05:59.720 --> 00:06:01.080
 >> Mr. Beck.

00:06:01.080 --> 00:06:02.200
 >> Thank you, Chair.

00:06:02.200 --> 00:06:05.520
 So we left area eight unsettled last week.

00:06:05.520 --> 00:06:08.200
 Where is that going to fit in as we proceed?

00:06:08.200 --> 00:06:10.680
 >> It will most likely be part of the group three.

00:06:10.680 --> 00:06:11.440
 >> Group three, okay.

00:06:11.440 --> 00:06:16.680
 >> Yeah, we're working on researching other information and we'll bring that as group three.

00:06:16.680 --> 00:06:17.440
 >> Okay, thanks.

00:06:17.440 --> 00:06:20.440
 >> Any other questions for Ron?

00:06:20.440 --> 00:06:23.240
 >> All right, great.

00:06:23.240 --> 00:06:23.880
 >> Great, thank you.

00:06:23.880 --> 00:06:24.380
 >> Thank you.

00:06:24.380 --> 00:06:28.600
 >> So that moves us to the agenda for this evening.

00:06:28.600 --> 00:06:32.240
 A couple of points before we begin, or just one point actually.

00:06:32.240 --> 00:06:40.560
 In the public hearing, item five D, which is kind of attached to five E.

00:06:40.560 --> 00:06:43.240
 It's the Hunters Creek project.

00:06:43.240 --> 00:06:46.440
 They are seeking a continuance on this item.

00:06:46.440 --> 00:06:52.720
 So what we are going to do this evening is move item D and E to item A, B.

00:06:52.720 --> 00:06:57.440
 In case there's any citizens or residents that would like to talk on that, we're just going to move it to the front end so

00:06:57.440 --> 00:06:59.000
 we don't have to wait for a postponement.

00:06:59.000 --> 00:07:07.240
 And then the plan is to open public hearing and see if there is a motion to postpone to a date certain of June 19th.

00:07:07.240 --> 00:07:10.840
 Other than that, the agenda is straightforward, right?

00:07:10.840 --> 00:07:11.340
 >> Correct.

00:07:11.340 --> 00:07:15.160
 >> So that brings us to our minutes.

00:07:15.160 --> 00:07:18.840
 Is there any updates or changes that need to be noted on the minutes by anyone?

00:07:18.840 --> 00:07:25.680
 We'll take those in two separate votes at the meeting tonight.

00:07:25.680 --> 00:07:27.640
 And that moves us to the consent agenda.

00:07:27.640 --> 00:07:31.680
 Is there any questions?

00:07:31.680 --> 00:07:33.800
 Looks like Julie has two and Mark has one.

00:07:33.800 --> 00:07:36.440
 Is there any questions on any of those?

00:07:36.440 --> 00:07:37.480
 Commissioner Beck?

00:07:37.480 --> 00:07:38.720
 >> Just some clarification.

00:07:38.720 --> 00:07:43.160
 I think it's, which one is that?

00:07:43.160 --> 00:07:49.960
 The consent agenda A, the, well, I left that.

00:07:54.160 --> 00:08:01.120
 >> The senior center, senior living center, is that just the extension of that, what is it, the Brookdale Denton cell?

00:08:01.120 --> 00:08:03.120
 Is that what we're looking at there?

00:08:03.120 --> 00:08:04.640
 >> Julie White, can you answer that one?

00:08:04.640 --> 00:08:09.120
 >> Yeah, I'm sorry.

00:08:09.120 --> 00:08:17.000
 Consent agenda A, PP1803.

00:08:17.000 --> 00:08:20.000
 >> All right, so this is a standalone lot.

00:08:20.000 --> 00:08:23.160
 So it isn't an extension, are you talking about an extension of the.

00:08:23.160 --> 00:08:25.800
 >> Right. >> Of the elderly housing on William Miller?

00:08:25.800 --> 00:08:26.480
 No, sir.

00:08:26.480 --> 00:08:28.800
 >> Because it sits, the area sits right behind it.

00:08:28.800 --> 00:08:34.720
 >> It does, it does, they are connected by a lot line, but it will be a standalone elderly housing use.

00:08:34.720 --> 00:08:37.600
 >> Okay, and they'll access off of William Miller?

00:08:37.600 --> 00:08:44.040
 >> No, sir, there will be fire access, or actually fire access will come from the adjacent property to the north.

00:08:44.040 --> 00:08:49.960
 But they will actually be accessed off of the I-35 access route.

00:08:49.960 --> 00:08:53.280
 >> From the, what would that be, the east end or the south end?

00:08:53.280 --> 00:08:54.600
 >> Kind of the northeast.

00:08:54.600 --> 00:08:56.040
 >> Okay. >> Side of the property.

00:08:56.040 --> 00:08:56.520
 >> Interesting.

00:08:56.520 --> 00:08:57.040
 Okay, thanks.

00:08:57.040 --> 00:09:01.800
 >> Any other questions for the consent agenda?

00:09:01.800 --> 00:09:06.280
 Great.

00:09:06.280 --> 00:09:11.240
 That moves us to individual considerations, item 4A, which is actually Julie White again.

00:09:11.240 --> 00:09:16.600
 I'll call her up for presentation on SP18-54.

00:09:20.200 --> 00:09:26.200
 >> All right, I'm Julie Wyatt, Senior Planner with the City of Denton,

00:09:26.200 --> 00:09:30.000
 and I'm presenting SP18-54, Bel Air Assisted Living.

00:09:30.000 --> 00:09:38.080
 The request before you is to consider approval of an alternative development plan for a proposed elderly housing development.

00:09:38.080 --> 00:09:40.320
 The subject property is outlined here in yellow.

00:09:40.320 --> 00:09:44.240
 It is about 1.83 acres.

00:09:44.240 --> 00:09:48.360
 It's on the north side of McKinney, adjacent to Bel Air Drive.

00:09:48.360 --> 00:09:55.480
 The purpose of the alternative development plan is to deviate from sections 35.13.8 buffer requirements,

00:09:55.480 --> 00:10:03.320
 section 35.13.13.4, non-residential and mixed use buildings in a pedestrian-oriented district.

00:10:03.320 --> 00:10:11.960
 The current zoning of the property is NRMU 12, it does have overlay conditions on it.

00:10:11.960 --> 00:10:18.560
 The zoning was approved in 2015 in order to develop the site with elderly housing.

00:10:18.560 --> 00:10:22.560
 And so those overlay conditions restricted the uses.

00:10:22.560 --> 00:10:26.200
 Elderly housing is one of the permitted uses on the site.

00:10:26.200 --> 00:10:32.200
 It also restricted the maximum amount of building that could be under air conditioning,

00:10:32.200 --> 00:10:39.280
 added a privacy fence to the north and east property lines, also increased the tree canopy overall and also for the parking lot.

00:10:39.280 --> 00:10:43.080
 NRMU 12 is considered one of our pedestrian-oriented districts, so

00:10:43.080 --> 00:10:48.560
 it has additional design guidelines for that pedestrian-oriented development.

00:10:48.560 --> 00:10:54.680
 And the applicant is seeking an ADP to address some design criteria in order to develop that elderly housing use.

00:10:54.680 --> 00:11:05.840
 So just again, ADPs do allow for that flexibility from sub-chapter 13 of the Denton Development Code, and those are the design considerations.

00:11:05.840 --> 00:11:10.320
 So and here are the sections that they would like to deviate from.

00:11:10.320 --> 00:11:18.280
 So the first is that there is a requirement that at least 60% of the street frontage should have buildings within 10 feet of the property line.

00:11:18.280 --> 00:11:24.560
 They're actually proposing to set those buildings back 50 feet from the right of way,

00:11:24.560 --> 00:11:29.120
 in order to provide activity areas for the residents and also to preserve some existing trees.

00:11:30.720 --> 00:11:36.440
 The perimeter fencing, when placed on a property, it's not a requirement in the Denton Development Code, generally.

00:11:36.440 --> 00:11:43.360
 But the code does require that that fencing be placed inside of any landscape buffers,

00:11:43.360 --> 00:11:47.240
 and they're requesting to actually put that fence on the property line.

00:11:47.240 --> 00:11:55.080
 And then they're also requesting a deviation from the buffer requirements on the east property line due to a gas easement.

00:11:55.080 --> 00:11:58.680
 So we'll go over that while looking at their site plan and landscape plans.

00:12:00.000 --> 00:12:03.280
 So here is their proposed site plan.

00:12:03.280 --> 00:12:07.640
 They're proposing four 6,400 square foot buildings.

00:12:07.640 --> 00:12:11.840
 They're proposing to set them back 50 feet from the right of way.

00:12:11.840 --> 00:12:20.760
 The site includes three entrances, one full access entrance in the center, and then two just entrance only.

00:12:20.760 --> 00:12:29.920
 Activity areas are proposed for those front yards, as I said, and decorative fencing will contain those activity areas.

00:12:29.920 --> 00:12:33.560
 They're also proposing front porches on the buildings.

00:12:33.560 --> 00:12:40.720
 And here shows those fencing required by the overlay, and then the parking is proposed for the rear of the site.

00:12:40.720 --> 00:12:52.800
 So if they follow the DDC requirements to move those buildings up within 10 feet of the front property line, this is kind of what it would look like.

00:12:52.800 --> 00:12:54.880
 Here you have your four buildings.

00:12:54.880 --> 00:13:01.120
 That 10 foot -- the orange line is a representation of where that 10 feet would approximately be.

00:13:01.120 --> 00:13:10.480
 The black dash line is actually a 25 foot setback, which is what's required per the plat for the residential properties for the neighborhood adjacent.

00:13:10.480 --> 00:13:16.440
 And then here shows that 50 foot setback, and you can kind of picture what it would look like at the street.

00:13:16.440 --> 00:13:21.800
 They're proposing to actually move that back, once again, to provide -- to activate those front parts of the area.

00:13:21.800 --> 00:13:27.640
 It would actually be more in line with what you typically see in a residential area, and staff feels like it's appropriate.

00:13:27.640 --> 00:13:37.440
 When we talk about the landscape plan and the buffers, if they followed the subchapter 13 requirements,

00:13:37.440 --> 00:13:49.320
 that north fence would be placed in this location here within the landscaping between the fence and the adjacent property owner's fence.

00:13:49.320 --> 00:13:57.480
 Now in our analysis of the case, this is something that you can often see in commercial areas where you've got the fence on the inside of the landscape buffer.

00:13:57.480 --> 00:14:07.840
 But when you're talking about kind of a residential area such as this, that adjacent fence on this single family neighbor's property would really create a corridor.

00:14:07.840 --> 00:14:20.880
 So you would have this landscaping sandwiched in between two fences, making maintenance difficult and really not providing any actual buffer between those two.

00:14:20.880 --> 00:14:28.640
 And there is a type C buffer, and they are proposing to put that type C buffer here, but they just want to make sure that that fence is on the property line in here.

00:14:28.640 --> 00:14:38.720
 And here's showing what it would actually look like if approved, that fence on the north property line within those buffer trees between the building and that fence.

00:14:38.720 --> 00:14:46.480
 Just generally, their landscape plan, they are providing that 50% tree canopy per the ordinance.

00:14:46.480 --> 00:14:53.440
 It would be a total of over 40,000 square feet at maturity, over 34,000 square feet of new trees.

00:14:53.440 --> 00:14:58.080
 They're actually preserving over the minimum, 5,000 square feet over that minimum.

00:14:58.080 --> 00:15:01.000
 They've got the 20% parking lot canopy.

00:15:01.000 --> 00:15:04.320
 They have the privacy fences we talked about.

00:15:04.320 --> 00:15:11.240
 That additional buffer on the east side, here's that gas line easement, which really does prevent any additional plantings.

00:15:11.240 --> 00:15:24.600
 They have strategically located their landscape islands in their parking to take advantage of that existing tree canopy that's there, so they're actually preserving those trees along that eastern property line.

00:15:24.600 --> 00:15:28.680
 We're not really anticipating the use to create nuisances for the adjacent properties.

00:15:28.680 --> 00:15:38.200
 This elderly housing is a residential use, so we think it would function like any other residential, wouldn't provide any nuisances for the adjacent properties.

00:15:38.200 --> 00:15:47.400
 However, there will be headlights for the cars, and so that fencing will definitely mitigate any lights that would shine on the adjacent property.

00:15:47.400 --> 00:15:53.160
 Here's the proposed elevations, the color elevations.

00:15:53.160 --> 00:15:58.240
 The criteria for approval in subchapter 13, the first is it preserve existing neighborhoods.

00:15:58.240 --> 00:16:03.200
 The proposed design and uses are compatible with the adjacent neighborhoods per our analysis.

00:16:03.200 --> 00:16:19.160
 That parking has been located in the rear to reduce those visual impacts, and they've proposed to put those activity areas close to the street that would foster social interaction and provide a nice place for the residents to sit.

00:16:19.160 --> 00:16:25.560
 A share quality development, the request is not to lower design standards, but just to develop that elderly housing use.

00:16:25.560 --> 00:16:38.200
 The setback as proposed would maintain visual consistency with the neighborhood, and the additional tree preservation and planting in front yard would also elevate the design standards of the development.

00:16:38.200 --> 00:16:43.120
 Any fencing and buffers would mitigate light and noise for those adjacent properties.

00:16:43.120 --> 00:16:50.240
 Another criteria is to focus new development activity centers, this is an infill lot, so it's not contributing to sprawl.

00:16:50.240 --> 00:16:53.680
 Number four, ensure infrastructure can accommodate development.

00:16:53.680 --> 00:17:04.040
 The necessary infrastructure is in place, water, sewer, as well as roadways, and it would result in a high quality development meeting the intent of the standards.

00:17:04.040 --> 00:17:09.120
 That uniform 50 foot setback would create that visual consistency along the street.

00:17:09.120 --> 00:17:15.840
 The activity areas in the front yard would also contribute to livability for the site.

00:17:15.840 --> 00:17:28.640
 They're proposing, well, they're required as part of the development, pedestrian improvements, and that includes sidewalks and street trees, and then the 50% tree canopy on site would be consistent with residential development.

00:17:28.640 --> 00:17:37.920
 Based upon the criteria for approval, staff recommends the request as it meets subchapter 13, and I'll stand for any questions.

00:17:37.920 --> 00:17:39.680
 >> Thank you, Chair.

00:17:39.680 --> 00:17:41.080
 Thanks, Julie.

00:17:41.080 --> 00:17:52.720
 When we talk about elderly housing, these, looking at the plans for them, it looks like they're single room only type occupancy buildings where they got their bedrooms, but there's a common area.

00:17:52.720 --> 00:17:56.280
 So we're not talking about elderly that require medical attention or anything like that.

00:17:56.280 --> 00:17:58.160
 >> This would be more of an assisted living.

00:17:58.160 --> 00:18:07.480
 >> Oh, it is. >> So it's going to be a little more intensive than a, you know, because elderly housing in our development code runs the gamut, and this would be more of the assisted living.

00:18:07.480 --> 00:18:18.840
 >> Okay, is one of the things that we're going to align, let me go find it here.

00:18:18.840 --> 00:18:27.960
 The maximum, it said, the maximum of 25,000 total square feet of gross air conditioned floor area.

00:18:27.960 --> 00:18:37.000
 But you said that there's going to be four buildings of 6,454, and that comes out to about 800 square feet over, so is-

00:18:37.000 --> 00:18:38.800
 >> That includes porch area.

00:18:38.800 --> 00:18:42.720
 So the overlay just was for air conditioned area.

00:18:42.720 --> 00:18:43.280
 >> Okay.

00:18:43.280 --> 00:18:54.560
 And just for my own notification, gas lines, underground gas lines, is there a distance that they have to be from residential units?

00:18:54.560 --> 00:18:56.960
 We don't put residences on top of them.

00:18:56.960 --> 00:19:00.040
 >> We don't, but the easement would- >> Right.

00:19:00.040 --> 00:19:01.520
 >> They have that easement taking care of.

00:19:01.520 --> 00:19:07.160
 >> On a minimum, okay, just curious about that, I think, thanks.

00:19:07.160 --> 00:19:07.920
 >> Any other questions?

00:19:07.920 --> 00:19:10.680
 >> Thank you, Julie.

00:19:10.680 --> 00:19:14.800
 >> Next item for business is item 4B, presented by Sean Jacobson.

00:19:14.800 --> 00:19:16.800
 It's ADP 19-5.

00:19:32.120 --> 00:19:36.240
 >> All right, good evening, Chair and members of the Planning and Zoning Commission.

00:19:36.240 --> 00:19:45.600
 Tonight, we're presenting ADP 19-0005, which is an alternative development plan for the Fred Moore Park.

00:19:45.600 --> 00:19:53.720
 So this is located at the corner of Wilson and Lakey Street, that northwest corner, northeast corner, I'm sorry.

00:19:53.720 --> 00:20:00.080
 It's on a plot of about 3.639 acres, primarily NR2 with a little bit of NR4.

00:20:00.080 --> 00:20:04.120
 And what's proposed is essentially an expansion park building.

00:20:04.120 --> 00:20:13.880
 So this is the culmination of a design that was presented to city council last year and was given consensus support by them.

00:20:13.880 --> 00:20:18.840
 But in the process of reviewing it, because we do have those non-residential and

00:20:18.840 --> 00:20:23.640
 mixed use buildings in a pedestrian oriented district, they apply because this is NR2.

00:20:23.640 --> 00:20:29.360
 Some of that design ran into some provisions of those standards, and so this ADP is to allow for some deviations.

00:20:31.080 --> 00:20:33.080
 And these are those four deviations.

00:20:33.080 --> 00:20:47.240
 So it would be that requirement for 25% windows, doors, or display areas when within 10 feet of a side street, a sidewall is within 10 feet of a street.

00:20:47.240 --> 00:20:53.080
 Requirement for 60% of the street frontage to have buildings within 10 feet of the front property line.

00:20:53.080 --> 00:21:03.960
 Requirement that developments have a minimum floor to area ratio of 0.4, which is that building area or pedestrian area is divided by that overall.

00:21:03.960 --> 00:21:09.840
 And then the requirement that windows require an architectural surround not be flush with the exterior wall.

00:21:09.840 --> 00:21:16.200
 So we'll talk through how those four deviations kind of fit into the overall design as we go forward.

00:21:16.200 --> 00:21:22.120
 Just to give you an idea of what's in place right now, this is actually one of our older park buildings.

00:21:22.120 --> 00:21:26.480
 I've been at an event there and it's quite small for what they're getting done there.

00:21:26.480 --> 00:21:28.360
 And so we have an opportunity to upgrade that.

00:21:28.360 --> 00:21:36.480
 You can also see the front there, it's primarily just grass and cement at this point, not a lot of additional landscaping and just beautiful.

00:21:36.480 --> 00:21:40.200
 On that side there, we have those dumpsters right along the street.

00:21:40.200 --> 00:21:42.200
 And again, you have a much older building.

00:21:42.200 --> 00:21:47.600
 You can see those air conditioning units on screen from the street there.

00:21:47.600 --> 00:21:52.800
 Overhead, we'll just zoom in there so you can see that is the existing building to the south there.

00:21:52.800 --> 00:22:01.160
 That as well as the two covered patio areas, all of that is proposed to be demolished.

00:22:01.160 --> 00:22:09.920
 And that would be replaced by a new building that would actually connect directly to that existing building to the north.

00:22:09.920 --> 00:22:16.800
 So one of those deviations, that proximity to the street by having a slightly larger setback there,

00:22:16.800 --> 00:22:25.360
 that allows the new building to align more closely with the existing building and kind of create the aesthetic of one building rather than two separate.

00:22:25.360 --> 00:22:29.400
 In addition there, you can see that this overall lot is primarily park.

00:22:29.400 --> 00:22:35.120
 And so therefore, that deviation from the minimum Florida area ratio to meet that,

00:22:35.120 --> 00:22:40.160
 we would have to dramatically expand the amount of building and pedestrian areas on that.

00:22:40.160 --> 00:22:42.320
 And that just wouldn't fit the character of a park.

00:22:42.320 --> 00:22:48.640
 So what's proposed is to keep that low and thereby preserve that natural park feeling.

00:22:48.640 --> 00:22:53.000
 In addition, so that's that building area there.

00:22:53.000 --> 00:22:58.120
 As part of this overall development, numerous additional trees are going to be planted.

00:22:58.120 --> 00:23:05.280
 And part of moving that building back a little bit farther than what's required enables additional trees to be there,

00:23:05.280 --> 00:23:11.200
 screen that building from what's across the street and create a much more attractive view for those folks across there.

00:23:11.200 --> 00:23:16.680
 And in particular, if you see that dumpster area there, rather than sitting right along the street as they do now,

00:23:16.680 --> 00:23:21.680
 we've worked with the applicant, with Parks Department, with the designers to move that back from the street,

00:23:21.680 --> 00:23:27.560
 to swing it to the side and to put about 400 square feet of landscaping around it as well as numerous trees,

00:23:27.560 --> 00:23:31.440
 screening that essentially from all directions, making that very hard to see.

00:23:31.440 --> 00:23:35.960
 So big improvement for the neighborhood across the street there.

00:23:35.960 --> 00:23:43.920
 With the windows, so you can see, and I'm sorry we couldn't get a better illustration in this,

00:23:43.920 --> 00:23:49.440
 but to the south you can see what's existing now and then the proposed elevation.

00:23:49.440 --> 00:23:53.680
 The windows proposed are designed to fit better with the aesthetic of the overall building,

00:23:53.680 --> 00:23:58.080
 rather than putting large windows that would be looking into a kitchen and a storage area,

00:23:58.080 --> 00:24:05.720
 proposing to limit the size of those windows and match the design more to the overall aesthetic of the building.

00:24:05.720 --> 00:24:11.800
 And then just so you can see from that front elevation there, what's current versus what is proposed,

00:24:11.800 --> 00:24:17.000
 be a nice open entryway and then we'll have landscaping and trees in there in between.

00:24:17.000 --> 00:24:23.640
 So again, much more pleasant view for the folks across the street there.

00:24:23.640 --> 00:24:26.920
 So the criteria we use for assessing this, preserve existing neighborhoods,

00:24:26.920 --> 00:24:33.640
 in this case with the additional landscaping and screening for both the neighborhoods across the street in Lakey and Wilson,

00:24:33.640 --> 00:24:36.640
 will be an improvement for them. Assuring quality development.

00:24:36.640 --> 00:24:40.840
 These deviations are part of creating better aesthetic alignment,

00:24:40.840 --> 00:24:50.000
 making the new building fit better with the adjacent building and preserving that park character, keeping it as natural as possible.

00:24:50.000 --> 00:24:52.320
 This is not an expansion outside the established park.

00:24:52.320 --> 00:24:57.920
 It's barely an expansion outside the current building footprint, so you wouldn't have any sprawl with that.

00:24:57.920 --> 00:25:02.600
 Ensure that infrastructure is capable, infrastructure is already in place for the building that's there.

00:25:02.600 --> 00:25:08.600
 And big thing there is ensure that what's being brought forward, this alternative is a high quality development.

00:25:08.600 --> 00:25:14.360
 Again, I've just highlighted that change there for the dumpster, vast improvement over what's in place there.

00:25:14.360 --> 00:25:22.000
 And again, you've seen we're taking an older building and put in place great improvement, many more trees, much more landscaping.

00:25:22.000 --> 00:25:27.520
 So overall, it's a very pedestrian welcoming, which is really the intent of the provisions that we're deviating from.

00:25:27.520 --> 00:25:35.680
 But in a park environment, this is really more welcoming to pedestrians to have that additional landscape.

00:25:35.680 --> 00:25:42.160
 So with that, staff recommends approval of this request as it meets our requirements for an ADP and I'll stand for any questions.

00:25:42.160 --> 00:25:48.160
 Any questions? Perfect. Thanks, Sean.

00:25:48.160 --> 00:25:50.840
 Next item for business is moving into our public hearings.

00:25:50.840 --> 00:26:00.840
 First item will be 5A, which again will be actually 5C this evening, but Haley can present FR19-0001.

00:26:00.840 --> 00:26:09.240
 All right. Good evening.

00:26:09.240 --> 00:26:15.600
 This is a replant that some of you may remember for St. John Paul, the Second Pastoral Center.

00:26:15.600 --> 00:26:22.320
 The property is located on McCormick Street between Eagle and Fannin, just south of the UNT campus.

00:26:22.320 --> 00:26:28.360
 This replant is intended to combine three lots that were subdivided by the red lines you can see on the screen into one lot,

00:26:28.360 --> 00:26:34.640
 which is outlined in blue with the intent of building a pastoral center for students close to the campus.

00:26:34.640 --> 00:26:40.640
 The replant was originally approved in 2016 since that time it has expired without being filed.

00:26:40.640 --> 00:26:46.720
 Also a new replant had to be reviewed for this property in order for them to begin work on the site.

00:26:46.720 --> 00:26:49.840
 And happy to answer any questions.

00:26:49.840 --> 00:26:56.640
 Any questions on this replant? Easy peasy. Thanks, Haley.

00:26:56.640 --> 00:27:04.240
 Next is item 5B, which will move to 5D this evening and Sean has this item.

00:27:04.240 --> 00:27:11.280
 This is going to look super familiar.

00:27:11.280 --> 00:27:16.840
 So this is Fred Moore Park site again, and as part of this project, we take the opportunity to clean up.

00:27:16.840 --> 00:27:22.960
 So right now, as you can see there, we have two platted lots, the original Fred Moore one,

00:27:22.960 --> 00:27:29.640
 as well as part of the Jasper addition here and then a large section of unplatted property here.

00:27:29.640 --> 00:27:37.960
 All of this makes up the park, and so with this replant, we would be bringing all of that into one plat,

00:27:37.960 --> 00:27:42.280
 taking that large section of the park all together, it cleans up some unplatted lots,

00:27:42.280 --> 00:27:45.720
 and it also deals with some issues we were having with the ADP.

00:27:45.720 --> 00:27:49.360
 We just approved where you had an issue of like, well, we have a setback distance.

00:27:49.360 --> 00:27:54.640
 Well, we have all of this park. It's just being, we had issues created by unnecessary lot lines.

00:27:54.640 --> 00:28:00.080
 This will clean all of that up. Put the park on one plat.

00:28:00.080 --> 00:28:06.000
 We did notice this. We received one letter of concern when I called her and explained what was going on.

00:28:06.000 --> 00:28:08.760
 She was no longer in opposition to the replant.

00:28:08.760 --> 00:28:13.920
 So staff recommends approval, and I'll stand for any questions.

00:28:13.920 --> 00:28:17.040
 Can you go back to that overhead?

00:28:17.040 --> 00:28:29.320
 No, no, no. The aerial. Yes. The park goes north and east of that, up to the baseball diamond.

00:28:29.320 --> 00:28:40.760
 Why is that not being taken into, and even east over to Bradshaw, why is all that not being platted into one?

00:28:40.760 --> 00:28:43.680
 We had discussed that, and that is something that can be done in the future.

00:28:43.680 --> 00:28:50.400
 But at the point where we were, it was just, we didn't want to cause any additional delay for those folks to get their senior center.

00:28:50.400 --> 00:28:53.360
 Got it. So we move forward. But that's definitely something we can do in the future.

00:28:53.360 --> 00:29:01.240
 Okay. Any other questions for Sean? Great. Thank you.

00:29:01.240 --> 00:29:26.520
 Thank you. Next item is Haley's, it's 5C, which is moving to 5E for this evening.

00:29:26.520 --> 00:29:32.720
 All right. Good evening. This is an amendment to the previously approved Rainier Road Apartments SUP.

00:29:32.720 --> 00:29:41.800
 So the request for you is to hold the public hearing, consider making a recommendation to council regarding an amendment to ordinance 2017-222,

00:29:41.800 --> 00:29:52.720
 which allowed for a multifamily use on this property that is just under one acre located at the intersection of Rainier Road and Rainier Court on the south side of Elm Street.

00:29:52.720 --> 00:29:56.200
 So here's a look at the originally approved SUP site plan.

00:29:56.200 --> 00:30:02.320
 This ordinance from 2017 included a very specific site plan, landscape plan, and building elevations.

00:30:02.320 --> 00:30:06.040
 As you can see here, the approved plan specified two buildings.

00:30:06.040 --> 00:30:11.320
 They're townhome style, so each unit has an individual front door and rear yard.

00:30:11.320 --> 00:30:14.360
 There are five units per building for a total of ten.

00:30:14.360 --> 00:30:21.360
 It also includes a storage building here on kind of the northwest side of the property and 23 parking spaces.

00:30:21.360 --> 00:30:31.040
 Along with this were building elevations that very specifically nailed down the amount of brick and stucco that had to be on each wall of each building.

00:30:31.040 --> 00:30:39.600
 There was a condition attached to the SUP ordinance that said the proposed development shall substantially comply with the site plan, landscape plan, and elevations.

00:30:39.600 --> 00:30:42.680
 Since 2017, the site has changed ownership.

00:30:42.680 --> 00:30:44.920
 They stuck with the original site plan and landscape plan.

00:30:44.920 --> 00:30:51.440
 They have a permit issued and are under construction, but the new owners hired a different architect and wanted to enhance the visuals of the building.

00:30:51.440 --> 00:30:56.600
 So now we'll look at those elevations that they're proposing to amend.

00:30:56.600 --> 00:30:59.880
 Just for reference here, the criteria for approval of an SUP.

00:30:59.880 --> 00:31:04.400
 These are outlined in your backup, but I didn't go into great detail because the site is already approved.

00:31:04.400 --> 00:31:12.160
 So we're really just looking at the similarity in scale, bulk, and coverage and the architectural compatibility criteria.

00:31:12.160 --> 00:31:20.720
 So here's a comparison of the 2017 facade versus what's now proposed for building one, which is the southernmost building on the site.

00:31:20.720 --> 00:31:25.840
 I chose to show the rear elevations because that's really what will be seen from both of the adjoining roadways.

00:31:25.840 --> 00:31:32.800
 But overall, you can see in 2017, there was an average of 30 to 50% stucco on each side of building one.

00:31:32.800 --> 00:31:41.880
 What they're proposing now lowers that to anywhere from 3% to 20% stucco, but then adds an element of stone to give more visual interest to the building.

00:31:41.880 --> 00:31:47.160
 And the stone would comprise 30 to 45% of building one.

00:31:47.160 --> 00:31:52.600
 Similarly on building two, I'm showing the rear elevation that would be visible along North Elm Street.

00:31:52.600 --> 00:31:58.880
 So a similar case where stucco was originally 40 to 50% of the front and rear sides of the building.

00:31:58.880 --> 00:32:05.200
 That's now being reduced to about 26% on the front and as low as 2% on the rear side.

00:32:05.200 --> 00:32:12.600
 Whereas stone is being added and it will account for 30 to 50% of the building facade on the front and rear side.

00:32:12.600 --> 00:32:18.080
 So as I mentioned, the use itself as well as the site plan and landscaping were approved in 2017.

00:32:18.080 --> 00:32:22.600
 At that time, the use was found to be consistent with all the criteria for approval.

00:32:22.600 --> 00:32:25.500
 There are no changes proposed to those plans at this time.

00:32:25.500 --> 00:32:32.840
 So the compatibility buffers, the existing tree preservation, all of that remains as it was in 2017.

00:32:32.840 --> 00:32:35.680
 And similarly, the style of the buildings is not being proposed to change.

00:32:35.680 --> 00:32:39.800
 They'll still be townhome style and look more consistent with single family.

00:32:39.800 --> 00:32:44.080
 This proposed change would not cause any nuisance or impacts to the property that we can identify.

00:32:44.080 --> 00:32:48.560
 Notification was sent, no responses have been received to date.

00:32:48.560 --> 00:32:54.040
 And with that, staff is recommending approval of the SUP amendment with one condition,

00:32:54.040 --> 00:32:59.200
 that the proposed building elevations as provided in your backup shall replace those that were approved with and

00:32:59.200 --> 00:33:05.480
 attached to Ordinance 2017 222, all other provisions of that ordinance shall remain as adopted.

00:33:05.480 --> 00:33:07.360
 Happy to stand for any questions.

00:33:07.360 --> 00:33:08.920
 >> Chris, you're back.

00:33:08.920 --> 00:33:10.000
 >> Thank you, Chair.

00:33:10.000 --> 00:33:15.320
 The elevation that faces North Hill, there's not a fence there, we're not requiring a fence there.

00:33:15.320 --> 00:33:17.560
 >> Each of the, let's see if this plan shows it.

00:33:17.560 --> 00:33:24.000
 Each of the townhomes has a small rear yard to allow for, I presume, pets or kids to play safely in the backyard.

00:33:24.000 --> 00:33:29.200
 So there would be a low, three to four foot high fence on the back of each unit, giving them each a small rear yard.

00:33:29.200 --> 00:33:30.600
 >> But not a six or eight foot.

00:33:30.600 --> 00:33:31.840
 >> No, sir. >> Great, thanks.

00:33:31.840 --> 00:33:34.860
 >> Any other questions for Haley?

00:33:34.860 --> 00:33:38.920
 Great, thank you very much.

00:33:38.920 --> 00:33:39.420
 >> Thank you.

00:33:39.420 --> 00:33:46.080
 >> Item 5D and 5E are seeking a continuance to June 19th.

00:33:46.080 --> 00:33:52.880
 So we've notified residents of this potential change and we're not going to be hearing the presentation in the work session this evening.

00:33:52.880 --> 00:33:56.000
 So with that, I will close, do we have anything else?

00:33:56.000 --> 00:33:59.360
 Okay, with that, I will close the work session at 538.

00:33:59.360 --> 00:34:01.600
 We'll reconvene in council chambers at 630.

00:34:01.600 --> 00:34:09.720
 >> Good evening, ladies and gentlemen.

00:34:09.720 --> 00:34:14.240
 Welcome to the Planning and Zoning Commission meeting for June 5th, 2019.

00:34:14.240 --> 00:34:18.360
 I'll call the meeting to order, seeing that we have a quorum at 630.

00:34:18.360 --> 00:34:22.840
 The first item of business is to stand, if able, and give the Pledge of Allegiance to the US and Texas flag.

00:34:22.840 --> 00:34:30.840
 >> I pledge allegiance to the flag of the United States of America, and to the Republic for

00:34:30.840 --> 00:34:36.960
 which it stands, one nation, under God, indivisible, with liberty and justice for all.

00:34:36.960 --> 00:34:40.760
 >> Honor the Texas flag.

00:34:40.760 --> 00:34:46.360
 I pledge allegiance to the Texas, one state, under God, one and indivisible.

00:34:49.360 --> 00:34:54.960
 >> Before we go to the next item, which will be the minutes, I wanted just to provide an update on the agenda tonight.

00:34:54.960 --> 00:35:03.760
 Item 5D and E, which are the Hunter's Creek Project, is seeking a postponement to a date certain of June 19th.

00:35:03.760 --> 00:35:10.560
 So this evening, there will not be a presentation pending the vote of 5D and E.

00:35:10.560 --> 00:35:14.640
 And we'll just take those out of order when we get to the public hearing section this evening.

00:35:14.640 --> 00:35:17.440
 With that, the next item for business is consideration of the minutes.

00:35:17.440 --> 00:35:21.120
 Because of an absence, we'll take these in two different votes.

00:35:21.120 --> 00:35:24.160
 So I'll ask for a motion for the minutes for May 1st.

00:35:24.160 --> 00:35:25.560
 Commissioner Beck?

00:35:25.560 --> 00:35:27.760
 >> Move to approve minutes for May 1st.

00:35:27.760 --> 00:35:28.920
 >> We have a first for approval.

00:35:28.920 --> 00:35:29.840
 Commissioner Pernetta?

00:35:29.840 --> 00:35:30.640
 >> Second.

00:35:30.640 --> 00:35:32.840
 >> We have a first and a second for approval.

00:35:32.840 --> 00:35:34.520
 Seeing no discussion, I'll call for a vote on the board.

00:35:34.520 --> 00:35:45.400
 Motion carries 5-0.

00:35:45.400 --> 00:35:48.120
 Next item is minutes for May 15th.

00:35:48.120 --> 00:35:49.400
 Commissioner Pernetta?

00:35:49.400 --> 00:35:50.920
 >> Move to approve.

00:35:50.920 --> 00:35:51.880
 >> We have a first for approval.

00:35:51.880 --> 00:35:52.640
 Commissioner Cole?

00:35:52.640 --> 00:35:53.360
 >> Second.

00:35:53.360 --> 00:35:55.360
 >> We have a first and a second for approval.

00:35:55.360 --> 00:35:56.920
 Seeing no discussion, I'll call for a vote on the board.

00:35:56.920 --> 00:36:08.800
 Motion carries 4-0 with one abstain.

00:36:08.800 --> 00:36:12.000
 Next item for business is the consent agenda.

00:36:12.000 --> 00:36:13.280
 Chair will entertain a motion.

00:36:13.280 --> 00:36:14.440
 Commissioner Beck?

00:36:14.440 --> 00:36:16.640
 >> Move to approve consent agenda.

00:36:16.640 --> 00:36:17.520
 >> We have a first for approval.

00:36:17.520 --> 00:36:18.240
 Commissioner Cole?

00:36:18.240 --> 00:36:19.240
 >> Second.

00:36:19.240 --> 00:36:22.880
 >> We have a first and a second for approval of the consent agenda.

00:36:22.880 --> 00:36:24.640
 Seeing no discussion, I'll call for a vote on the board.

00:36:24.640 --> 00:36:33.400
 Motion carries 5-0.

00:36:33.400 --> 00:36:36.320
 Next item for business is items for individual consideration.

00:36:36.320 --> 00:36:40.320
 First item before ASP 18-0054.

00:36:40.320 --> 00:36:41.840
 I'll invite Julie Wyatt for presentation.

00:36:44.440 --> 00:36:54.600
 >> Good evening, I'm Julie Wyatt, Senior Planner with the City of Denton.

00:36:54.600 --> 00:36:57.400
 And I'm presenting SP18-54 to you this evening.

00:36:57.400 --> 00:37:04.080
 The request is for an alternative development plan for a proposed elderly housing development.

00:37:04.080 --> 00:37:10.080
 The subject property is located on the northeast corner of McKinney and Bel Air.

00:37:10.080 --> 00:37:16.640
 And the purpose of the ADP is to deviate from sections 35.13(8) buffer requirements and

00:37:16.640 --> 00:37:22.240
 35.13(13(4) non-residential and mixed use buildings in a pedestrian-oriented district.

00:37:22.240 --> 00:37:28.360
 The subject property has a zoning designation of NRMU 12 with overlay conditions.

00:37:28.360 --> 00:37:32.400
 That zoning was approved in 2015 with those overlay conditions

00:37:32.400 --> 00:37:36.240
 in order to facilitate the development of an elderly housing use.

00:37:36.240 --> 00:37:40.160
 It did limit the amount of square footage that could be put on the property,

00:37:40.160 --> 00:37:43.800
 as well as required privacy fences on the north and east property lines.

00:37:43.800 --> 00:37:47.440
 Additional tree canopy was also required as a result of it.

00:37:47.440 --> 00:37:50.600
 NRMU 12 is one of our pedestrian-oriented districts and

00:37:50.600 --> 00:37:55.680
 therefore has different site design regulations than what you typically see in

00:37:55.680 --> 00:37:58.200
 a commercial or institutional building.

00:37:58.200 --> 00:38:02.120
 And the applicant is seeking an alternative development plan to address some design criteria.

00:38:05.080 --> 00:38:10.440
 So an ADP is a process, it's a flexible discretionary process that the Denton

00:38:10.440 --> 00:38:16.080
 development code allows that permits applicants to deviate from sub-chapter 13

00:38:16.080 --> 00:38:20.040
 site design requirements if approved by the Planning and Zoning Commission.

00:38:20.040 --> 00:38:23.520
 The sections that the applicant would like to deviate from, there are three of them.

00:38:23.520 --> 00:38:27.520
 The first one would require at least 60% of the street frontage

00:38:27.520 --> 00:38:30.600
 to have buildings within 10 feet of the front property line.

00:38:30.600 --> 00:38:34.160
 The applicant is actually proposing to move those buildings back 50 feet.

00:38:35.360 --> 00:38:40.360
 They also are asking to deviate from the perimeter fencing that would be

00:38:40.360 --> 00:38:44.840
 required to be located inside the boundary of a required landscape buffer.

00:38:44.840 --> 00:38:48.320
 The applicant would actually like to put that fence on the perimeter of the site and

00:38:48.320 --> 00:38:51.880
 still provide that buffer, but put the fence on the perimeter.

00:38:51.880 --> 00:38:56.800
 And then there's a type C buffer that's required on the east property line,

00:38:56.800 --> 00:38:58.960
 which would require a certain amount of plannings.

00:38:58.960 --> 00:39:03.720
 There is a gas line easement in that location, which really prevents that planting.

00:39:03.720 --> 00:39:08.280
 They are proposing to put that fence there required by the zoning,

00:39:08.280 --> 00:39:10.240
 as well as preserve some existing trees.

00:39:10.240 --> 00:39:13.800
 So the proposed site plan is shown here.

00:39:13.800 --> 00:39:16.840
 There are four buildings proposed.

00:39:16.840 --> 00:39:20.120
 They are proposed to be set back 50 feet from the street.

00:39:20.120 --> 00:39:21.640
 That's that blue line right here.

00:39:21.640 --> 00:39:26.160
 There are three driveways associated with the development.

00:39:26.160 --> 00:39:30.320
 One full access and then two just entrances.

00:39:31.360 --> 00:39:34.400
 There are activities proposed for the front yard, and

00:39:34.400 --> 00:39:38.600
 that would allow a preservation of existing mature tree canopy.

00:39:38.600 --> 00:39:43.880
 And that there are decorative fences proposed for those front yard areas.

00:39:43.880 --> 00:39:48.480
 And then that privacy fence is shown here, and then the parking would be in the rear.

00:39:48.480 --> 00:39:49.640
 This is Bel Air Drive here.

00:39:49.640 --> 00:39:57.880
 So when we look at what the DDC requirements would be for setbacks, we show that

00:39:59.200 --> 00:40:02.760
 generally that ten foot setback would be this orange line right here.

00:40:02.760 --> 00:40:09.720
 A 25 foot setback is what the existing structures in the neighborhood,

00:40:09.720 --> 00:40:15.000
 those residential structures are required to meet per their plat when it was platted.

00:40:15.000 --> 00:40:19.480
 And then this blue line shows the 50 foot setback that the applicant is requesting.

00:40:19.480 --> 00:40:22.400
 So if those buildings were moved forward to that 10 feet,

00:40:22.400 --> 00:40:24.480
 you could see how that would look on the street.

00:40:24.480 --> 00:40:30.200
 It would be out of character with what that existing development pattern shows and

00:40:30.200 --> 00:40:34.600
 would potentially interrupt that visual sight line on the street.

00:40:34.600 --> 00:40:38.840
 What the applicant is proposing is to move those back 50 feet.

00:40:38.840 --> 00:40:42.760
 It would provide visual consistency not only on the subject property, but

00:40:42.760 --> 00:40:46.080
 then it would be a little more consistent with the surrounding neighborhood.

00:40:48.680 --> 00:40:54.720
 The DDC requirements for landscaping include that fencing here.

00:40:54.720 --> 00:40:57.520
 This is that north property line fence.

00:40:57.520 --> 00:41:01.880
 If they met some Chapter 13 requirements, that fence would be required to be pushed

00:41:01.880 --> 00:41:06.120
 in with that landscaping on the outside of that fence.

00:41:06.120 --> 00:41:09.800
 However, because of the residential nature of the area, there is an existing fence here.

00:41:09.800 --> 00:41:11.240
 There's the neighbor's fence.

00:41:11.240 --> 00:41:15.400
 And it really would create sort of a pinched corridor, making maintenance of that buffer

00:41:16.680 --> 00:41:19.880
 difficult, and really reducing the effectiveness on that buffer.

00:41:19.880 --> 00:41:25.880
 The applicant is proposing to move that fence to that property line,

00:41:25.880 --> 00:41:31.480
 still adding those buffer elements there between the building and that fence.

00:41:31.480 --> 00:41:33.440
 But to move it to that property line.

00:41:33.440 --> 00:41:36.280
 Just some other elements regarding their proposed landscape plan.

00:41:36.280 --> 00:41:41.080
 They're proposing street trees along Bel Air in accordance with the DIN development code.

00:41:41.080 --> 00:41:44.640
 That overlay condition requires 50% tree canopy,

00:41:44.640 --> 00:41:51.080
 which would result in over 40,000 square feet of canopy at maturity.

00:41:51.080 --> 00:41:56.040
 And that would include 34,000 square feet of new trees, as well as over 5,000 square feet

00:41:56.040 --> 00:42:00.400
 of preserved trees in addition to the minimum preservation requirements.

00:42:00.400 --> 00:42:02.600
 They're required parking lot tree canopy.

00:42:02.600 --> 00:42:06.000
 Also, they have that privacy fence.

00:42:06.000 --> 00:42:10.480
 This yellow shows that gas line easement, which really does restrict any plantings in

00:42:10.480 --> 00:42:12.960
 that back portion of the property.

00:42:12.960 --> 00:42:17.880
 And as you can see, these green circles here show those preserved trees that they're proposing.

00:42:17.880 --> 00:42:22.120
 And they've put their landscape islands strategically to capture those trees.

00:42:22.120 --> 00:42:29.040
 We feel that the proposed buffers, the fencing, and then those existing as well as

00:42:29.040 --> 00:42:33.200
 proposed trees, would mitigate any nuisances that would be caused from this property.

00:42:33.200 --> 00:42:36.240
 It really is a residential use in a residential area.

00:42:36.240 --> 00:42:39.400
 Really don't anticipate a lot of negative impacts.

00:42:39.400 --> 00:42:45.360
 With the proposed elevations, the criteria for approval in sub-chapter 13 of the DIN

00:42:45.360 --> 00:42:48.400
 development code, first, does it preserve existing neighborhoods?

00:42:48.400 --> 00:42:53.920
 The proposed design and use are compatible with the adjacent neighborhoods.

00:42:53.920 --> 00:42:58.160
 And that parking is placed in order to reduce those visual impacts.

00:42:58.160 --> 00:43:02.760
 And then having those activity areas close to the street really do foster social interaction

00:43:02.760 --> 00:43:11.000
 and really do help use to operate in a way that's consistent with a residential neighborhood.

00:43:11.000 --> 00:43:15.760
 A share quality development, the request is not intended to lower design standards, but

00:43:15.760 --> 00:43:20.960
 to allow them to maintain the visual consistency with the setback and to provide additional

00:43:20.960 --> 00:43:24.040
 tree preservation and planting in the front yard areas.

00:43:24.040 --> 00:43:27.960
 Focused new development and activity centers, this is an infill lot, wouldn't contribute

00:43:27.960 --> 00:43:29.840
 to sprawl.

00:43:29.840 --> 00:43:33.200
 Under infrastructure is adequate to accommodate development.

00:43:33.200 --> 00:43:35.920
 There is necessary infrastructure in place.

00:43:35.920 --> 00:43:39.280
 And would result in a high quality development meeting the intent of the standards.

00:43:39.280 --> 00:43:43.360
 This uniform 50 foot setback creates visual consistency.

00:43:43.360 --> 00:43:48.720
 The additional tree plantings, the fencing, all of it would make sure that it is compatible

00:43:48.720 --> 00:43:50.680
 with the surrounding property.

00:43:50.680 --> 00:43:55.660
 Also pedestrian improvements associated with the development would complete that sidewalk

00:43:55.660 --> 00:43:58.760
 network on that side of the street.

00:43:58.760 --> 00:44:03.200
 Also staff does recommend approval of the request as it does meet the criteria in Subject

00:44:03.200 --> 00:44:04.960
 13 of the Denton Development Code.

00:44:04.960 --> 00:44:08.840
 I'll stand for any questions and the applicant is here.

00:44:08.840 --> 00:44:09.840
 Thank you, Julie.

00:44:09.840 --> 00:44:12.660
 I do not see any questions.

00:44:12.660 --> 00:44:18.600
 This is an individual-considerated item, so we're not going to have a public hearing opportunity.

00:44:18.600 --> 00:44:23.360
 Is there any discussion or motion from the commission?

00:44:23.360 --> 00:44:30.080
 Commissioner Beck?

00:44:30.080 --> 00:44:32.080
 We have a motion to approve.

00:44:32.080 --> 00:44:33.080
 Commissioner Sanchez?

00:44:33.080 --> 00:44:34.080
 I second it.

00:44:34.080 --> 00:44:35.880
 We have a first and a second for approval.

00:44:35.880 --> 00:44:36.880
 Any discussion?

00:44:36.880 --> 00:44:45.700
 Seeing none, I'll call for a vote on the board.

00:44:45.700 --> 00:44:48.880
 Motion carries 5-0.

00:44:48.880 --> 00:45:02.720
 Next item for business is item 4B, ADP 19-0005, and I'll invite Sean Jacobson for presentation.

00:45:02.720 --> 00:45:05.440
 Thank you, Mr. Chair and members of the Planning and Zoning Commission.

00:45:05.440 --> 00:45:09.800
 My name is Sean Jacobson, Assistant Planner with the Planning Department, and I'm here

00:45:09.800 --> 00:45:16.400
 tonight to present a request for an ADP for the American Legion Center at Fredmore Park,

00:45:16.400 --> 00:45:21.960
 and this is a request to deviate from section 3513 for non-residential mixed-use buildings

00:45:21.960 --> 00:45:23.960
 in a pedestrian-oriented district.

00:45:23.960 --> 00:45:30.840
 The site is about 3.639 acres that northeast corner of Lakey and Wilson Street, primarily

00:45:30.840 --> 00:45:37.400
 zoned NR2, a little bit of NR4, and this ADP is to facilitate construction of an expansion

00:45:37.400 --> 00:45:43.340
 of the existing American Legion Senior Center.

00:45:43.340 --> 00:45:48.880
 Those four areas of deviation we mentioned, one is that walls facing side streets must

00:45:48.880 --> 00:45:54.960
 be at least 25% windows, display areas, or doors; second is that 60% of the street frontage

00:45:54.960 --> 00:45:58.880
 must have buildings within 10 feet of the front property line; third is a requirement

00:45:58.880 --> 00:46:03.920
 for the development to have a minimum floor area ratio of .4; and the fourth is that windows

00:46:03.920 --> 00:46:07.080
 require architectural surround, not be flush with the exterior wall.

00:46:07.080 --> 00:46:11.600
 So we'll go through where those deviations fit in the overall plan as we go forward.

00:46:11.600 --> 00:46:17.120
 Just to give you a sense, this is the existing building, one of our older park buildings.

00:46:17.120 --> 00:46:21.440
 Primarily you're seeing cement and grass at the front there.

00:46:21.440 --> 00:46:26.440
 On the side there we have dumpsters that are essentially right along the street, you have

00:46:26.440 --> 00:46:30.520
 unscreened air conditioning units.

00:46:30.520 --> 00:46:34.000
 From above, we'll just zoom in there, you can see what would be removed would be that

00:46:34.000 --> 00:46:42.560
 building to the south as well as the covered patios to the north and west there.

00:46:42.560 --> 00:46:47.000
 And the proposal would be to replace that with a new building that will actually connect

00:46:47.000 --> 00:46:49.280
 directly to the building to the north there.

00:46:49.280 --> 00:46:54.840
 So that's one of the reasons for the larger setback, rather than being close to the road

00:46:54.840 --> 00:46:59.040
 there, moving it back allows it to more closely align with the building to the north, be attached

00:46:59.040 --> 00:47:00.040
 there.

00:47:00.040 --> 00:47:09.880
 It also allows for, as you can see, the addition of trees and a landscape area in front of

00:47:09.880 --> 00:47:13.040
 the building, provides greater screen for that neighborhood across the street.

00:47:13.040 --> 00:47:17.640
 You can also see around the dumpster area there, that's been moved off the street back,

00:47:17.640 --> 00:47:21.120
 so now the doors are facing away from the neighborhood, it has screening around that

00:47:21.120 --> 00:47:27.180
 landscaping and trees, and that again, benefit to the neighborhood across the street there.

00:47:27.180 --> 00:47:32.840
 With the Florida area ratio, not requiring that minimum, that ensures that we're not

00:47:32.840 --> 00:47:36.900
 having to add large amounts of additional building and pavement to the park, instead

00:47:36.900 --> 00:47:40.800
 we're preserving that natural environment with a lower Florida area ratio.

00:47:40.800 --> 00:47:46.560
 And then with the two window related requirements, as you can see, this is the south elevation,

00:47:46.560 --> 00:47:53.920
 so the existing is below there, what's proposed allows for not having large windows that look

00:47:53.920 --> 00:47:58.400
 into a kitchen and storage area, and the windows proposed better fit with the overall aesthetic

00:47:58.400 --> 00:48:04.320
 of the building, so that you have one kind of unified appearance throughout.

00:48:04.320 --> 00:48:08.960
 And just so you can see at the front of the building there, currently, again, there's

00:48:08.960 --> 00:48:13.400
 almost no landscaping or trees there, what's proposed will have a much more pleasant park-like

00:48:13.400 --> 00:48:17.400
 appearance for the folks across the street.

00:48:17.400 --> 00:48:20.800
 So when we assess an ADP, we have a number of criteria for approval.

00:48:20.800 --> 00:48:24.720
 First of all, does it preserve existing neighborhoods, and as we've discussed, you're getting quite

00:48:24.720 --> 00:48:30.080
 a bit of additional screening and trees, more attractive landscaping for neighborhoods across

00:48:30.080 --> 00:48:34.200
 Lakey and Wilson Street, and the building is being moved a little bit farther away from

00:48:34.200 --> 00:48:35.200
 those houses.

00:48:35.200 --> 00:48:40.560
 Ensuring quality development, these deviations allow for overall unified aesthetic between

00:48:40.560 --> 00:48:43.880
 these two buildings, the expansion and the existing building.

00:48:43.880 --> 00:48:47.480
 It would not expand beyond the boundaries of the park there, so you're not getting sprawl

00:48:47.480 --> 00:48:50.440
 because of this.

00:48:50.440 --> 00:48:55.180
 We have infrastructure for the existing park building, so that's ready to go.

00:48:55.180 --> 00:48:58.520
 And then the most important one, ensuring that developers alternative proposal results

00:48:58.520 --> 00:49:03.520
 in a high-quality development, and we're really happy about the amount of additional trees

00:49:03.520 --> 00:49:07.240
 and landscaping we're getting through this, getting those dumpsters off the street there

00:49:07.240 --> 00:49:11.360
 for the neighborhood, and having really a continuous building design rather than two

00:49:11.360 --> 00:49:12.360
 separate buildings.

00:49:12.360 --> 00:49:18.000
 It's going to be a benefit to the neighborhood.

00:49:18.000 --> 00:49:22.160
 So with that, we do recommend approval, and if you have any questions, I'd be happy to

00:49:22.160 --> 00:49:23.160
 answer those.

00:49:23.160 --> 00:49:24.160
 We do have one question.

00:49:24.160 --> 00:49:25.160
 Commissioner Beck.

00:49:25.160 --> 00:49:26.160
 Thank you, John.

00:49:26.160 --> 00:49:32.560
 Just out of curiosity, this is city park buildings we're talking about, city-owned, city-financed.

00:49:32.560 --> 00:49:38.680
 What's the history behind that sign-out front that says American Legion Senior Center?

00:49:38.680 --> 00:49:41.880
 You know, that is a good question.

00:49:41.880 --> 00:49:46.040
 I don't know the precise history there, but I believe it may have been in the beginning

00:49:46.040 --> 00:49:48.480
 that it was also an American Legion meeting site.

00:49:48.480 --> 00:49:51.680
 It may have been a sponsorship, but I just don't know the answer to that.

00:49:51.680 --> 00:49:52.680
 I'm sorry.

00:49:52.680 --> 00:49:53.680
 Okay.

00:49:53.680 --> 00:49:54.680
 It's all right.

00:49:54.680 --> 00:49:55.680
 Thank you.

00:49:55.680 --> 00:49:56.680
 So many questions you have.

00:49:56.680 --> 00:49:57.680
 Thanks, Sean.

00:49:57.680 --> 00:49:58.680
 Thank you.

00:49:58.680 --> 00:50:02.840
 Just like the previous item, this is not a public hearing, so chair will entertain motion

00:50:02.840 --> 00:50:08.720
 or discussion.

00:50:08.720 --> 00:50:17.920
 Commissioner Beck.

00:50:17.920 --> 00:50:20.920
 We have a first, and Commissioner Preneta, do you have a second?

00:50:20.920 --> 00:50:21.920
 I'll second.

00:50:21.920 --> 00:50:29.200
 So we have a first for Commissioner Beck, second from Commissioner Preneta.

00:50:29.200 --> 00:50:33.480
 For approval of ADP 19-005, any discussion?

00:50:33.480 --> 00:50:38.480
 Seeing none, I'll call for a vote on the board.

00:50:38.480 --> 00:50:42.960
 Motion carries 5-0.

00:50:42.960 --> 00:50:47.680
 That moves us into a public hearing.

00:50:47.680 --> 00:50:50.920
 As I mentioned earlier, we're going to take two items out of order this evening.

00:50:50.920 --> 00:51:00.200
 So instead of going to 5-A, we're going to skip to 5-D, item Z18-0025A, and open the

00:51:00.200 --> 00:51:08.920
 public hearing and ask a commissioner for a vote to postpone to a date certain of June

00:51:08.920 --> 00:51:10.360
 19th.

00:51:10.360 --> 00:51:12.520
 Commissioner Beck.

00:51:12.520 --> 00:51:14.120
 Thank you, chair.

00:51:14.120 --> 00:51:18.840
 Move to postpone this to a date certain of June 19th.

00:51:18.840 --> 00:51:19.840
 Commissioner Preneta.

00:51:19.840 --> 00:51:20.840
 Second the motion.

00:51:20.840 --> 00:51:26.040
 We have a first and a second for postponement of Z18-0025A.

00:51:26.040 --> 00:51:27.040
 Any discussion?

00:51:27.040 --> 00:51:29.880
 Seeing none, I'll call for a vote on the board.

00:51:29.880 --> 00:51:39.080
 Motion carries 5-0.

00:51:39.080 --> 00:51:48.040
 Next item for business is item 5-E. I'll open the public hearing for S19-0004A and ask the

00:51:48.040 --> 00:51:51.720
 commissioner for a motion to postpone to a date certain of June 19th.

00:51:51.720 --> 00:51:52.720
 Commissioner Preneta.

00:51:52.720 --> 00:51:55.940
 Motion to postpone to a date certain of June 19th.

00:51:55.940 --> 00:51:58.080
 We have a first for approval.

00:51:58.080 --> 00:51:59.080
 Commissioner Sanchez.

00:51:59.080 --> 00:52:00.080
 Second.

00:52:00.080 --> 00:52:04.880
 We have a first and a second to postpone or approve the vote to postpone.

00:52:04.880 --> 00:52:07.760
 See any discussion?

00:52:07.760 --> 00:52:15.160
 Seeing none, I'll call for a vote on the board.

00:52:15.160 --> 00:52:17.880
 Motion carries 5-0.

00:52:17.880 --> 00:52:23.080
 Next item for business this evening will be 5A, FR19-0001.

00:52:23.080 --> 00:52:31.320
 I'll invite Haley for presentation.

00:52:31.320 --> 00:52:37.880
 Good evening.

00:52:37.880 --> 00:52:42.480
 This is a replat for lot 2R of the FMDARN ALL edition.

00:52:42.480 --> 00:52:47.900
 The replat is a combination of lots 2, 3, and 4 of the same edition.

00:52:47.900 --> 00:52:51.760
 You can see on the map here the red lines representing the former property lines that

00:52:51.760 --> 00:52:57.200
 would be abandoned by this plat and the blue outline representing the new larger lot boundary.

00:52:57.200 --> 00:53:01.280
 The intent is to develop this site with a pastoral center for UNT students.

00:53:01.280 --> 00:53:06.200
 It's located just south of the campus between Eagle Drive and Fannin Street along McCormick

00:53:06.200 --> 00:53:07.200
 Street.

00:53:07.200 --> 00:53:09.800
 With that, I'm happy to answer any questions you may have.

00:53:09.800 --> 00:53:11.800
 Thank you, Haley.

00:53:11.800 --> 00:53:14.440
 I do not see any questions.

00:53:14.440 --> 00:53:15.440
 This is a public hearing.

00:53:15.440 --> 00:53:19.600
 Anyone wishing to speak may certainly do so on this item.

00:53:19.600 --> 00:53:22.640
 Seeing none, I'll close the public hearing.

00:53:22.640 --> 00:53:23.640
 Commissioner Pernetta?

00:53:23.640 --> 00:53:25.120
 A motion to approve.

00:53:25.120 --> 00:53:27.280
 We have a first for approval.

00:53:27.280 --> 00:53:28.280
 Commissioner Sanchez?

00:53:28.280 --> 00:53:29.280
 Second.

00:53:29.280 --> 00:53:32.040
 We have a first and a second for approval.

00:53:32.040 --> 00:53:34.240
 Any discussion?

00:53:34.240 --> 00:53:42.800
 Seeing none, I'll call for a vote on the board.

00:53:42.800 --> 00:53:44.960
 Motion carries 5-0.

00:53:44.960 --> 00:53:51.040
 The next item for business is item 5B, FR19-0005.

00:53:51.040 --> 00:53:57.760
 I'll invite Sean Jacobson for presentation and open the public hearing.

00:53:57.760 --> 00:54:08.980
 Good evening, Mr. Chair and members of the commission.

00:54:08.980 --> 00:54:12.960
 This will look familiar because, again, we're back at Fred Moore Park.

00:54:12.960 --> 00:54:16.660
 As part of this process, as we were going through the ADP, we realized we also had the

00:54:16.660 --> 00:54:22.840
 opportunity to clean up what is currently two platted lots that are part of the park

00:54:22.840 --> 00:54:27.200
 as well as a number of unplatted lots and a drainage plot there.

00:54:27.200 --> 00:54:32.240
 What's proposed is a final replat to take all of that property and bring that into one

00:54:32.240 --> 00:54:35.520
 lot, Fred Moore Park.

00:54:35.520 --> 00:54:39.800
 That would just remove a lot of unnecessary lot lines, put that part of the park all on

00:54:39.800 --> 00:54:42.800
 one plot.

00:54:42.800 --> 00:54:45.100
 We did notice this proposed replat.

00:54:45.100 --> 00:54:48.640
 We received a letter from one property owner, but when staff spoke with her and explained

00:54:48.640 --> 00:54:53.400
 the nature of the request, she had no concerns.

00:54:53.400 --> 00:54:57.680
 Staff recommends approval of this request as it meets our criteria for a final replat.

00:54:57.680 --> 00:54:58.680
 Thank you, Sean.

00:54:58.680 --> 00:55:02.200
 I do not see any questions for you.

00:55:02.200 --> 00:55:03.200
 This is a public hearing.

00:55:03.200 --> 00:55:06.560
 Anyone wishing to speak may certainly do so.

00:55:06.560 --> 00:55:08.000
 Seeing none, I'll close the public hearing.

00:55:08.000 --> 00:55:14.720
 Mr. Sanchez, I make a motion to approve FR19005.

00:55:14.720 --> 00:55:16.520
 We have a first for approval.

00:55:16.520 --> 00:55:17.520
 Commissioner Fernetta?

00:55:17.520 --> 00:55:18.520
 Second the motion.

00:55:18.520 --> 00:55:20.680
 We have a first and a second for approval.

00:55:20.680 --> 00:55:21.680
 Any discussion?

00:55:21.680 --> 00:55:29.640
 Seeing none, I'll call for a vote on the board.

00:55:29.640 --> 00:55:31.840
 Motion carries 5-0.

00:55:31.840 --> 00:55:36.960
 The next item for business is item 5C, S19-0008.

00:55:36.960 --> 00:55:49.240
 I will invite Haley for presentation and open public hearing.

00:55:49.240 --> 00:55:56.720
 Good evening.

00:55:56.720 --> 00:56:02.000
 This is case S19-8 for an amendment to the Riney Road Apartments SUP.

00:56:02.000 --> 00:56:05.520
 The request before you is to hold a public hearing and consider making a recommendation

00:56:05.520 --> 00:56:12.800
 to council regarding a request to amend SUP ordinance 2017-222 to allow for changes to

00:56:12.800 --> 00:56:15.920
 the approved building facades for a multifamily development.

00:56:15.920 --> 00:56:18.240
 The site is located on the south side of North Elm Street.

00:56:18.240 --> 00:56:20.080
 You can see it outlined in yellow on the map.

00:56:20.080 --> 00:56:24.000
 It is just under one acre in size.

00:56:24.000 --> 00:56:29.240
 In 2017, an SUP was approved for this site allowing a multifamily development that ordinance

00:56:29.240 --> 00:56:34.440
 included a very specific site plan, landscape plan, and building elevations and had a condition

00:56:34.440 --> 00:56:39.780
 that the proposed development had to substantially comply with all of those plans in the future.

00:56:39.780 --> 00:56:44.200
 You can see here the approved landscape plan so it includes two buildings.

00:56:44.200 --> 00:56:48.600
 They are town home style so the units each have a separate front entry and they do have

00:56:48.600 --> 00:56:53.240
 small rear yards that will include fences that you can see here on the back sides of

00:56:53.240 --> 00:56:54.240
 the building.

00:56:54.240 --> 00:56:59.160
 There is a total of ten units, 23 parking spaces, and then a detached storage building

00:56:59.160 --> 00:57:00.500
 on the site.

00:57:00.500 --> 00:57:03.920
 If you've driven by this property, you'll notice that it is currently under construction

00:57:03.920 --> 00:57:08.520
 with foundations recently poured for these as their permit has been issued.

00:57:08.520 --> 00:57:12.280
 They could develop today in accordance with that approved SUP, but the new owner of the

00:57:12.280 --> 00:57:16.760
 property is seeking to make some architectural enhancements.

00:57:16.760 --> 00:57:20.400
 For reference here, the criteria for approval of an SUP, these were all discussed in your

00:57:20.400 --> 00:57:21.400
 backup.

00:57:21.400 --> 00:57:25.700
 The most applicable to this amendment are the requirements for similarity and scale

00:57:25.700 --> 00:57:32.120
 bulk and coverage and architectural compatibility with the impacted area.

00:57:32.120 --> 00:57:36.120
 Looking at building one now to look at those proposed changes, you can see on the left

00:57:36.120 --> 00:57:38.720
 side what was approved in 2017.

00:57:38.720 --> 00:57:43.880
 This is the rear side of building one so this would be what fronts Riney Court.

00:57:43.880 --> 00:57:46.300
 And then on the right side of the screen is what's proposed.

00:57:46.300 --> 00:57:51.320
 So the major difference, as I mentioned, is the addition of stone to the facades.

00:57:51.320 --> 00:57:56.920
 Previously it was all stucco and brick, anywhere from 30 to 47% stucco on the original elevations.

00:57:56.920 --> 00:58:01.080
 That would be reduced to around 20% on the front and rear.

00:58:01.080 --> 00:58:05.720
 And then the stone elements would account for 30 to 45% of those larger building facades

00:58:05.720 --> 00:58:08.640
 on the front and back.

00:58:08.640 --> 00:58:12.400
 Similar story with building two, this is the rear side of the building that would be visible

00:58:12.400 --> 00:58:14.320
 driving along North Elm Street.

00:58:14.320 --> 00:58:19.360
 So similar case where previously it was 40 to 50% stucco on the front and rear, that'll

00:58:19.360 --> 00:58:24.820
 now be reduced to 25% on the front, less than 5% on all other sides.

00:58:24.820 --> 00:58:29.780
 And the stone elements would account for 30 to 40% of the building facade.

00:58:29.780 --> 00:58:33.960
 When doing our analysis, staff considered that there are no changes being proposed to

00:58:33.960 --> 00:58:35.620
 the development of the site.

00:58:35.620 --> 00:58:38.760
 Everything is still in accordance with the approved site plan and landscape plan, which

00:58:38.760 --> 00:58:42.640
 was found to be consistent with the criteria for approval and the underlying zoning in

00:58:42.640 --> 00:58:44.240
 2017.

00:58:44.240 --> 00:58:47.840
 These proposed change in material would make the buildings perhaps more consistent with

00:58:47.840 --> 00:58:51.760
 residential style development as stone is a common material and would not result in

00:58:51.760 --> 00:58:56.200
 any nuisance or impact to the surrounding properties.

00:58:56.200 --> 00:59:00.160
 Question was sent out regarding this request, we've received no responses to date.

00:59:00.160 --> 00:59:03.920
 And staff is recommending approval of the SUP amendment with one condition, that the

00:59:03.920 --> 00:59:10.320
 proposed elevations would replace those approved with and attached to Ordinance 2017-222.

00:59:10.320 --> 00:59:12.600
 All other provisions of that ordinance would remain as adopted.

00:59:12.600 --> 00:59:15.200
 And I'm happy to stand for any questions.

00:59:15.200 --> 00:59:17.160
 Thank you, Haley.

00:59:17.160 --> 00:59:20.080
 I do not see any questions.

00:59:20.080 --> 00:59:21.080
 This is a public hearing.

00:59:21.080 --> 00:59:25.560
 Anyone wishing to speak may certainly do so.

00:59:25.560 --> 00:59:29.720
 Seeing none, I will close the public hearing and turn to the days for discussion or motion.

00:59:29.720 --> 00:59:31.200
 Commissioner Beck.

00:59:31.200 --> 00:59:37.200
 Thank you, Chair, I move to approve S19-0008.

00:59:37.200 --> 00:59:38.640
 We have a first for approval.

00:59:38.640 --> 00:59:39.640
 Commissioner Cole.

00:59:39.640 --> 00:59:40.640
 Second.

00:59:40.640 --> 00:59:41.640
 We have a first and a second for approval.

00:59:41.640 --> 00:59:44.480
 Any discussion on the item?

00:59:44.480 --> 00:59:49.480
 Seeing none, I'll call for a vote on the board.

00:59:49.480 --> 00:59:58.880
 Motion carries 5-0.

00:59:58.880 --> 01:00:03.000
 With 5-D and 5-E already being heard this evening, that moves our next item to business

01:00:03.000 --> 01:00:05.720
 to the plan and zoning project matrix.

01:00:05.720 --> 01:00:09.040
 I'll let Richard start and we can have discussion.

01:00:09.040 --> 01:00:13.000
 Just wanted to provide one quick update.

01:00:13.000 --> 01:00:17.280
 I know we had a lot to be determined on this.

01:00:17.280 --> 01:00:22.880
 Just given the number of items being scheduled, we weren't sure some of these dates.

01:00:22.880 --> 01:00:30.320
 I did hear from Deborah and Christy earlier this afternoon and it looks like we will be

01:00:30.320 --> 01:00:37.120
 bringing the upland habitat item at the July 17th meeting along with the criteria manual

01:00:37.120 --> 01:00:38.120
 for the east.

01:00:38.120 --> 01:00:43.200
 I know they're going through the committee on the environment now and so what they're

01:00:43.200 --> 01:00:48.520
 projecting is once it gets out of committee they'll be ready for the July 17th meeting.

01:00:48.520 --> 01:00:54.200
 Did want to let everyone know for the next meeting we'll probably start early.

01:00:54.200 --> 01:01:00.560
 Right now we've got nine consent items which really shouldn't be too bad but we do have

01:01:00.560 --> 01:01:07.720
 right now tentatively seven public hearing items and obviously the two from tonight at

01:01:07.720 --> 01:01:14.280
 the next P&Z so it will be a full agenda.

01:01:14.280 --> 01:01:20.040
 Just to give a quick update on some of the council actions on the items, at the 521 city

01:01:20.040 --> 01:01:26.520
 council meeting they did approve the razor ranch south mixed use district.

01:01:26.520 --> 01:01:29.280
 There was one additional condition that was added.

01:01:29.280 --> 01:01:38.440
 If you recall they were doing these cottage style single family homes and with the reduction

01:01:38.440 --> 01:01:43.400
 in parking they did limit those units to one bedroom so that was something that council

01:01:43.400 --> 01:01:48.120
 put in place and then if you recall that the prairie parcel that was the rezoning of that

01:01:48.120 --> 01:01:54.160
 small lot there was an overlay restriction also put on that property limiting it to just

01:01:54.160 --> 01:02:01.040
 a single family home but also allowing for an accessory dwelling or structure.

01:02:01.040 --> 01:02:07.960
 At last night's council meeting they did approve unanimously the text amendment for the treatment

01:02:07.960 --> 01:02:14.480
 facility as well as the solutions of north Texas related SUP.

01:02:14.480 --> 01:02:21.440
 Both the rezoning and SUP were approved unanimously for Denton bank and the downtown design standards

01:02:21.440 --> 01:02:25.920
 were also approved last night so just a quick update on those items that carried forward

01:02:25.920 --> 01:02:26.920
 to the city council.

01:02:26.920 --> 01:02:28.920
 Great thank you for the update.

01:02:28.920 --> 01:02:34.600
 Is there any questions or additions to add to the matrix this evening?

01:02:34.600 --> 01:02:36.040
 Fantastic.

01:02:36.040 --> 01:02:40.200
 With that I will close the planning and zoning commission for June 5th at 658.