1 00:00:00,000 --> 00:00:06,640 Welcome to the City of Denton's Planning and Zoning Commission meeting for Wednesday, 2 00:00:06,640 --> 00:00:09,520 November 1, 2023. 3 00:00:09,520 --> 00:00:13,660 This is our special called work session, and with the quorum present, I will call us to 4 00:00:13,660 --> 00:00:15,540 order at 4.08 p.m. 5 00:00:15,540 --> 00:00:21,500 I'll let the record show that Commissioner Villarreal is absent from today's meeting. 6 00:00:21,500 --> 00:00:29,220 We've got one item on our work session today, and it is 1A, receive a report, hold a discussion, 7 00:00:29,220 --> 00:00:35,120 give staff direction regarding the draft goals, objectives, implementation strategies for 8 00:00:35,120 --> 00:00:37,460 the Northeast Denton Area Plan. 9 00:00:37,460 --> 00:00:41,100 We've got a lot of material to cover. 10 00:00:41,100 --> 00:00:42,620 Angie's going to open this meeting. 11 00:00:42,620 --> 00:00:45,780 We are going to get through presentation. 12 00:00:45,780 --> 00:00:50,560 There are breaks in the presentation where we can have questions answered, but we've 13 00:00:50,560 --> 00:00:55,360 got to get through the information before we can get any kind of discussion started. 14 00:00:55,360 --> 00:00:59,200 So I will let Angie take it away, and go from there. 15 00:00:59,200 --> 00:01:01,160 Thank you. 16 00:01:01,160 --> 00:01:02,160 Thank you, Chair. 17 00:01:02,160 --> 00:01:05,680 Good evening, members of the Planning and Zoning Commission, Angie Mangler, Senior Planner 18 00:01:05,680 --> 00:01:07,320 Development Services. 19 00:01:07,320 --> 00:01:12,080 This is a special called meeting to discuss the draft goals, objectives, recommendations, 20 00:01:12,080 --> 00:01:15,000 implementation strategies for the Northeast Denton Area Plan. 21 00:01:15,000 --> 00:01:20,720 Just to give you a little bit of recap as to why we're here at the August 1, 2023 joint 22 00:01:20,720 --> 00:01:24,940 work session with the Northeast Denton Area Plan Steering Committee. 23 00:01:24,940 --> 00:01:29,560 The Planning and Zoning Commission and City Council direction was given to move forward 24 00:01:29,560 --> 00:01:34,240 with scenario two, or what was called the Balancing Act at the time. 25 00:01:34,240 --> 00:01:39,080 From there, draft goals and recommended implementation strategies have been prepared, and that's 26 00:01:39,080 --> 00:01:42,080 what we're here to discuss this afternoon. 27 00:01:42,080 --> 00:01:46,000 So your task today is to get through a hefty amount of material. 28 00:01:46,000 --> 00:01:51,840 As the Chair stated, we have 21 recommended implementation strategies that we will be 29 00:01:51,840 --> 00:01:52,900 discussing. 30 00:01:52,900 --> 00:01:55,960 They fall into five broad categories. 31 00:01:55,960 --> 00:02:01,560 Land development, infrastructure development, economic development, environmental preservation, 32 00:02:01,560 --> 00:02:02,560 and historic preservation. 33 00:02:02,560 --> 00:02:07,640 So in each of those five categories, you're going to find several recommended implementation 34 00:02:07,640 --> 00:02:12,360 strategies that tie back to the goals of the Northeast Denton Area Plan. 35 00:02:12,360 --> 00:02:15,200 Our consultant, Shai, will be presenting the material. 36 00:02:15,200 --> 00:02:18,640 There will be a set of slides for land development, and at the end of that section, we'll take 37 00:02:18,640 --> 00:02:24,320 a brief pause for any questions that came up regarding the land development scenarios, 38 00:02:24,320 --> 00:02:27,720 recommended strategies that were proposed, and then we'll move on to the next, and we'll 39 00:02:27,720 --> 00:02:31,980 do the same with infrastructure, and we'll make our way through the presentation gradually. 40 00:02:31,980 --> 00:02:34,360 It is a lengthy presentation. 41 00:02:34,360 --> 00:02:39,360 At the end, what we would like from you all is we have a matrix of each of the strategies 42 00:02:39,360 --> 00:02:40,360 that is proposed. 43 00:02:40,360 --> 00:02:43,160 Do you generally agree with the strategy? 44 00:02:43,160 --> 00:02:44,160 Do you not? 45 00:02:44,160 --> 00:02:46,520 Does the strategy need some modification? 46 00:02:46,520 --> 00:02:51,740 And the objective of this meeting is at the end of the presentation, and after discussing 47 00:02:51,740 --> 00:02:56,000 through all of the strategies, to receive some form of consensus on each of them, whether 48 00:02:56,000 --> 00:03:00,400 that be agree that this is appropriate for the plan, agree that it's not appropriate 49 00:03:00,400 --> 00:03:05,920 for the plan, or agree that it's okay to move forward, but you have some modifications for 50 00:03:05,920 --> 00:03:07,400 it. 51 00:03:07,400 --> 00:03:08,600 With that, I believe that's all I have. 52 00:03:08,600 --> 00:03:11,600 Tina, did you want to add anything? 53 00:03:11,600 --> 00:03:15,200 There it goes. 54 00:03:15,200 --> 00:03:19,840 Tina Fargans, Deputy Director of Development Services and Planning Director. 55 00:03:19,840 --> 00:03:26,440 Just wanted to add, I know that there may be some questions with respect to the scenario 56 00:03:26,440 --> 00:03:27,520 two plan. 57 00:03:27,520 --> 00:03:30,240 Our purpose here is not to rehash that this evening. 58 00:03:30,240 --> 00:03:33,560 Council gave us direction on that scenario two plan, and so that's what we're moving 59 00:03:33,560 --> 00:03:34,560 forward with. 60 00:03:34,560 --> 00:03:40,240 I would like for you to then focus your discussion, as Angie put it, on the strategies that will 61 00:03:40,240 --> 00:03:42,780 be presented this evening. 62 00:03:42,780 --> 00:03:47,200 Keep in mind, all of this work builds upon itself, based upon past direction that we've 63 00:03:47,200 --> 00:03:51,400 received, and then eventually gets formulated and put into the final plan. 64 00:03:51,400 --> 00:03:53,400 With that, I'll turn it over to the Chair. 65 00:03:53,400 --> 00:03:56,040 If you have anything additional, otherwise we can start with our presentation. 66 00:03:56,040 --> 00:03:57,040 No, I'm good. 67 00:03:57,040 --> 00:03:58,040 I'm ready for it. 68 00:03:58,040 --> 00:03:59,040 All right. 69 00:03:59,040 --> 00:04:00,040 We'll turn it over to Shai, and we will start our presentation. 70 00:04:00,040 --> 00:04:01,040 Thank you all. 71 00:04:01,040 --> 00:04:02,040 Thank you, Angie. 72 00:04:02,040 --> 00:04:09,520 Good afternoon, Chair, members of the Planning and Zoning Commission. 73 00:04:09,520 --> 00:04:11,120 Thank you all so much for your time. 74 00:04:11,120 --> 00:04:17,040 I know your time is very short, so I'm going to just start with our presentation. 75 00:04:17,040 --> 00:04:24,400 So, again, reiterating what Angie said, today we are hoping to receive direction from you 76 00:04:24,400 --> 00:04:30,640 all on the draft goals, objectives, and strategies for the plan, and also any advice you all 77 00:04:30,640 --> 00:04:37,280 have for us on these draft goals and objectives and strategies. 78 00:04:37,280 --> 00:04:42,480 In the end, like she said, we'd like to know which strategies you'd like to keep, remove, 79 00:04:42,480 --> 00:04:46,600 modify, or recommend any changes to. 80 00:04:46,600 --> 00:04:52,360 So, today's agenda, we'll start with a quick little background, and then what the framework 81 00:04:52,360 --> 00:04:58,320 is for these, talk about the goals, objectives, and then go through those recommended strategies, 82 00:04:58,320 --> 00:05:02,560 and then have the direction and discussion at the end. 83 00:05:02,560 --> 00:05:10,460 So, really quick on the background, when we started working on this plan, we received 84 00:05:10,460 --> 00:05:17,600 a lot of the previous planning materials from staff and from the city, and what we did was 85 00:05:17,600 --> 00:05:22,880 we looked at all those previous effort, planning efforts, we've reviewed the comprehensive 86 00:05:22,880 --> 00:05:29,400 plan, we looked at the North Denton Neighborhood Association plan, and a lot of this comes 87 00:05:29,400 --> 00:05:30,400 from that. 88 00:05:30,400 --> 00:05:37,480 Our next step was to go through public engagement to make sure what out of those previous planning 89 00:05:37,480 --> 00:05:44,960 efforts was valid, what still worked, what was still needed and wanted. 90 00:05:44,960 --> 00:05:50,280 All the details about this public engagement are in another presentation on the website 91 00:05:50,280 --> 00:05:56,460 for people who want to know what was the purpose behind each of these and what the results 92 00:05:56,460 --> 00:06:01,400 of each of these were in detail around the website, so I won't go through all of this 93 00:06:01,400 --> 00:06:08,760 again, but summary, we really talked to a lot of people, we talked to the residents, 94 00:06:08,760 --> 00:06:12,800 we talked to the developers, we talked to the landowners, we even talked to people from 95 00:06:12,800 --> 00:06:18,960 all over the city of each age group to make sure that they were all involved in the plan, 96 00:06:18,960 --> 00:06:27,720 and what came out of this was, in short, there were many more that you can see in the presentation, 97 00:06:27,720 --> 00:06:33,800 but in short, people wanted to preserve rural character, wanted to preserve open space, 98 00:06:33,800 --> 00:06:41,360 did not want apartments, wanted a walkable outdoor recreation family place, they did 99 00:06:41,360 --> 00:06:48,120 want to turn this into some kind of a showcase or a legacy area for the region also. 100 00:06:48,120 --> 00:06:55,560 So that's the short summary we did go through, and I've highlighted the main points of the 101 00:06:55,560 --> 00:07:00,320 vision statement so we don't go through the whole long thing, but as you can see, people 102 00:07:00,320 --> 00:07:06,400 wanted rural housing, two to five acre lots, they wanted to look at the standards that 103 00:07:06,400 --> 00:07:13,240 were outlined in the 2040 comp plan, conservation development to retain rural character, protect 104 00:07:13,240 --> 00:07:20,840 open space was main point, another was make the space available for all of Denton to enjoy. 105 00:07:20,840 --> 00:07:28,760 So going forward, August 1st, you all were there at the meeting, we were given the direction 106 00:07:28,760 --> 00:07:36,000 to proceed with scenario two, the next two maps kind of recap what the scenario two land 107 00:07:36,000 --> 00:07:42,680 use and zoning was, the main thing we wanted to point out is there was a gateway land use 108 00:07:42,680 --> 00:07:50,840 description in scenario two, and it caused a little confusion because there's north side 109 00:07:50,840 --> 00:07:57,800 the gateway had recommended multifamily, but the areas of gateway that were shown south 110 00:07:57,800 --> 00:08:04,000 of hardly field did not have multifamily, so because it caused confusion, we divided 111 00:08:04,000 --> 00:08:09,580 it into two and now we're calling it gateway north and gateway south. 112 00:08:09,580 --> 00:08:15,640 So as you can see, we also have hashed the area that is not within the city limits and 113 00:08:15,640 --> 00:08:20,060 therefore not under any city control. 114 00:08:20,060 --> 00:08:26,920 It's in the county, the reason I just want to reiterate that there are proposed recommendations 115 00:08:26,920 --> 00:08:34,360 in this area is so that if anybody in the future wants to annex into the city, the city 116 00:08:34,360 --> 00:08:41,520 will know what zoning or what kind of standards to apply to that property and it will be clear 117 00:08:41,520 --> 00:08:48,200 to the property owner what standards they can expect to have applied to the property. 118 00:08:48,200 --> 00:08:51,400 As mentioned, can you all see the, yeah. 119 00:08:51,400 --> 00:08:59,560 So these two are the gateway north, the pink at the south here and here are gateway south. 120 00:08:59,560 --> 00:09:04,600 One quick thought here, the rural village center which at this point is shown in the 121 00:09:04,600 --> 00:09:05,960 county area. 122 00:09:05,960 --> 00:09:12,800 The purpose of this land use category is so that it can also be applied if needed within 123 00:09:12,800 --> 00:09:18,360 the residential transition or between the residential and rural transition. 124 00:09:18,360 --> 00:09:24,560 The purpose of this is to provide neighborhood type retail uses that people can walk to and 125 00:09:24,560 --> 00:09:29,000 bike to and reduce the car trips. 126 00:09:29,000 --> 00:09:33,620 This is the mobility plan that was being recommended. 127 00:09:33,620 --> 00:09:38,880 We'll talk more in detail about how it differs from the others. 128 00:09:38,880 --> 00:09:45,180 As you can see, there are some roadways recommended in the county area and the reason for that 129 00:09:45,180 --> 00:09:47,600 is not to go building everything right now. 130 00:09:47,600 --> 00:09:54,820 The reason is that we can still do platting in the county and so when we do plat, we can 131 00:09:54,820 --> 00:09:56,680 ask for the right of way. 132 00:09:56,680 --> 00:10:02,040 We don't have to build the roadways if there is no development but at least you'll have 133 00:10:02,040 --> 00:10:07,680 the right of way in case development happens there, we can at least build the roadways 134 00:10:07,680 --> 00:10:11,520 and that's the main purpose for it. 135 00:10:11,520 --> 00:10:18,720 Going forward, the plan or the strategies are framed in five different categories. 136 00:10:18,720 --> 00:10:23,720 Angie went through those so we'll start with the goals. 137 00:10:23,720 --> 00:10:32,600 These goals are exactly the same taken from Denton 2040 comp plan and the North Denton 138 00:10:32,600 --> 00:10:34,400 neighborhood area plan. 139 00:10:34,400 --> 00:10:40,300 It is to have stage growth which is fiscally and environmentally sound and then conservation 140 00:10:40,300 --> 00:10:45,400 development to retain rural character, protect open space and greenways. 141 00:10:45,400 --> 00:10:54,120 So objectives, again, the ones, the highlighted yellow part tells you what text has been exactly 142 00:10:54,120 --> 00:10:57,800 taken from the North Denton area plan. 143 00:10:57,800 --> 00:11:02,000 As you can see, a lot of what they had was really good work. 144 00:11:02,000 --> 00:11:09,200 We've just taken it, enhanced it, and added a way to make it implementable. 145 00:11:09,200 --> 00:11:16,760 And so it's environmental preservation, health safety quality of life, rural character, preserving 146 00:11:16,760 --> 00:11:23,440 historic assets, turning this area into a regional asset and then to foster economic 147 00:11:23,440 --> 00:11:25,320 stability. 148 00:11:25,320 --> 00:11:30,120 Looking at those two goals and these five objectives is how we'd like you to listen 149 00:11:30,120 --> 00:11:33,640 to the strategies moving forward. 150 00:11:33,640 --> 00:11:40,680 So the first strategy is, of course, conservation development and to promote it for all future 151 00:11:40,680 --> 00:11:46,120 developments in this area regardless of what the development is, where it is. 152 00:11:46,120 --> 00:11:51,880 And you can see from these three ideas that the idea is higher the density, more open 153 00:11:51,880 --> 00:11:54,660 space you get for conservation. 154 00:11:54,660 --> 00:12:03,120 The one thing to note is when we say that's open space, that is public open space in addition 155 00:12:03,120 --> 00:12:08,180 to areas like the flood plain, areas that cannot be developed. 156 00:12:08,180 --> 00:12:14,400 This is land that can be developed that we are saying if we give them more density, they 157 00:12:14,400 --> 00:12:19,720 can actually give you the land that they would have otherwise developed to put in a conservation 158 00:12:19,720 --> 00:12:25,660 easement or dedicated as open space, which is public open space. 159 00:12:25,660 --> 00:12:32,240 So all these three scenarios, density is three units per acre. 160 00:12:32,240 --> 00:12:37,080 It's just how it's laid out. 161 00:12:37,080 --> 00:12:42,800 This we'll go through, hopefully you've all read the details of how, why we can come back 162 00:12:42,800 --> 00:12:45,820 to it if you all have questions. 163 00:12:45,820 --> 00:12:55,200 We'll move on to strategy two, that is retail commercial and three units per acre development 164 00:12:55,200 --> 00:13:00,320 being closer to the major roadways on the sides as you can see. 165 00:13:00,320 --> 00:13:06,440 And that way the lower density development towards the big green space conservation area 166 00:13:06,440 --> 00:13:08,640 flood plain to preserve it. 167 00:13:08,640 --> 00:13:15,760 And that is exactly following the plan and the idea that comes out of North Denton Neighborhood 168 00:13:15,760 --> 00:13:18,160 Association plan. 169 00:13:18,160 --> 00:13:23,680 And that's more about how to do it, why to do it. 170 00:13:23,680 --> 00:13:30,760 The third strategy is neighborhood level commercial development at specific nodes, I just talked 171 00:13:30,760 --> 00:13:31,880 about it. 172 00:13:31,880 --> 00:13:39,760 This is kind of a hypothetical rendering, but the idea is to preserve that rural character, 173 00:13:39,760 --> 00:13:45,360 create this little node so people can walk to and not have to drive all over for their 174 00:13:45,360 --> 00:13:52,320 everyday needs to still feel like they're in a rural area, but not have to get in their 175 00:13:52,320 --> 00:14:00,160 car for getting to basic retail or a restaurant or something. 176 00:14:00,160 --> 00:14:07,200 And then strategy four is design standards, and design standards that can enhance the 177 00:14:07,200 --> 00:14:09,680 rural character of the area. 178 00:14:09,680 --> 00:14:15,880 We're recommending that a set of standards be developed that are specific to Northeast 179 00:14:15,880 --> 00:14:25,560 Denton area so the development can add and enhance the rural character that is there. 180 00:14:25,560 --> 00:14:32,040 The fifth strategy is development agreements, and as we've talked about it a lot before, 181 00:14:32,040 --> 00:14:41,400 the majority of the study area is in the ETJ, really not much land user zoning control on 182 00:14:41,400 --> 00:14:42,400 this land. 183 00:14:42,400 --> 00:14:49,160 And if you have development agreements, this would be a way to protect this area, so it 184 00:14:49,160 --> 00:14:53,840 would mean that the property owners would voluntarily enter into a development agreement 185 00:14:53,840 --> 00:14:59,800 with the city, which would say that they can develop it as it is a little bit more, but 186 00:14:59,800 --> 00:15:02,240 keep the land use as what it is. 187 00:15:02,240 --> 00:15:08,120 But if in the future they sell it to a developer or they want to do a higher density development, 188 00:15:08,120 --> 00:15:13,480 something different, it would voluntarily come into city limits, and then this plan 189 00:15:13,480 --> 00:15:16,360 and all the other city regulations would apply. 190 00:15:16,360 --> 00:15:22,400 So that would protect all the neighbors around, because then there would be some control on 191 00:15:22,400 --> 00:15:24,160 what goes on to that property. 192 00:15:24,160 --> 00:15:28,520 So that's the whole purpose of development agreement is people who are there, people 193 00:15:28,520 --> 00:15:34,640 who want to keep it open, want to just live there, can stay as is, if at all they plan 194 00:15:34,640 --> 00:15:39,840 to sell it, or in the future their heirs sell it, then the city would have some control, 195 00:15:39,840 --> 00:15:46,440 and the people would have some security of knowing that there will be some control. 196 00:15:46,440 --> 00:15:50,440 So those are the five land use strategies. 197 00:15:50,440 --> 00:15:54,680 I know I rushed through it, but do you all have any questions or clarifications on that 198 00:15:54,680 --> 00:15:55,680 one? 199 00:15:55,680 --> 00:15:56,680 Commissioner Smith. 200 00:15:56,680 --> 00:15:57,680 Thank you, Chair. 201 00:15:57,680 --> 00:16:01,400 On the development agreements, the last piece, how does that done? 202 00:16:01,400 --> 00:16:02,840 Is it done through deed restrictions? 203 00:16:02,840 --> 00:16:09,360 Is it, and essentially the point of my question is how legally binding is that? 204 00:16:09,360 --> 00:16:14,000 So they are done as development agreements, much like we've done development agreements 205 00:16:14,000 --> 00:16:19,400 with some of the municipal utility districts, also we've done non-annexation agreements. 206 00:16:19,400 --> 00:16:23,640 So they would be similar in that regard, where they're entered into, negotiated with the 207 00:16:23,640 --> 00:16:25,080 property owner in the city. 208 00:16:25,080 --> 00:16:30,560 And then there are, typically development agreements are approved by council, and then 209 00:16:30,560 --> 00:16:34,160 we can have them filed a record, so that way they also show up any time a title search 210 00:16:34,160 --> 00:16:35,160 is done. 211 00:16:35,160 --> 00:16:37,640 But it's negotiated between the city and the property owner. 212 00:16:37,640 --> 00:16:41,200 So filed with the title, so I mean this is the most likely scenario. 213 00:16:41,200 --> 00:16:45,360 So this is what's happened in the past when we've seen developments on the north side. 214 00:16:45,360 --> 00:16:51,960 Original landowner, either in older age or in death, a state or inheritors are dealing 215 00:16:51,960 --> 00:16:55,060 with the sale of that land, and they're trying to get rid of it. 216 00:16:55,060 --> 00:16:58,280 They sell it to whoever a developer is looking to buy it, the developer should be doing their 217 00:16:58,280 --> 00:17:01,200 research and pulling and checking title records. 218 00:17:01,200 --> 00:17:04,680 If they don't, they just buy it anyway, so when they go pull title records to be able 219 00:17:04,680 --> 00:17:08,720 to go through and start the development process, they would find that, correct? 220 00:17:08,720 --> 00:17:09,720 Correct. 221 00:17:09,720 --> 00:17:13,360 And then we, the city, also would keep track of those, much like what we do right now with 222 00:17:13,360 --> 00:17:15,160 the non-annexation agreements that we have. 223 00:17:15,160 --> 00:17:21,120 We've got them mapped, and then we're able to, you know, as people come in and raise 224 00:17:21,120 --> 00:17:24,440 questions regarding what they might be able to do with their property longer term, then 225 00:17:24,440 --> 00:17:27,320 we're able to also advise them that the property is subject to this agreement. 226 00:17:27,320 --> 00:17:28,320 Okay. 227 00:17:28,320 --> 00:17:29,320 That's question 1A. 228 00:17:29,320 --> 00:17:30,320 Question 1B. 229 00:17:30,320 --> 00:17:31,320 Who solicits these? 230 00:17:31,320 --> 00:17:36,880 I understand who maintains, but who's going in soliciting these development agreements? 231 00:17:36,880 --> 00:17:40,400 Is it city staff that's going after the landowners over there? 232 00:17:40,400 --> 00:17:44,200 Is it, we hope the neighborhood goes and talks to these owners and say, "Hey, you need to 233 00:17:44,200 --> 00:17:48,080 voluntarily go to the city and ask about a development agreement and do that." 234 00:17:48,080 --> 00:17:49,720 Who's soliciting these? 235 00:17:49,720 --> 00:17:55,520 So typically it would be the property owner, the property owner coming in and having conversations 236 00:17:55,520 --> 00:17:59,440 with city staff about, "Hey, we're interested in developing the property. 237 00:17:59,440 --> 00:18:02,240 What's our longer term options associated with this?" 238 00:18:02,240 --> 00:18:06,040 And we would engage in that conversation, you know, with, particularly with it being 239 00:18:06,040 --> 00:18:08,320 property within the ETJ. 240 00:18:08,320 --> 00:18:12,040 As Shy pointed out, we do have limited regulatory authority within the ETJ when it comes to 241 00:18:12,040 --> 00:18:13,360 regulating land uses. 242 00:18:13,360 --> 00:18:17,520 So it would be, if someone is interested in doing something with their property longer 243 00:18:17,520 --> 00:18:20,700 term, then us engaging in that conversation with them. 244 00:18:20,700 --> 00:18:25,400 How often is the landowner, I mean, this is, that's a step. 245 00:18:25,400 --> 00:18:26,720 It's more than a step. 246 00:18:26,720 --> 00:18:30,680 It's a mile before it comes to our viewpoint. 247 00:18:30,680 --> 00:18:36,240 How often do landowners come in and talk to city staff before they even get into conversations 248 00:18:36,240 --> 00:18:38,600 with the developer or get into conversations with what they want to do? 249 00:18:38,600 --> 00:18:44,040 I mean, I understand a landowner as the developer who bought the land then comes in and talks, 250 00:18:44,040 --> 00:18:49,680 but, you know, Joe Blow Rancher, who's got 300 acres, who comes in and talks that often 251 00:18:49,680 --> 00:18:50,680 about that forehand? 252 00:18:50,680 --> 00:18:52,920 You know, that's really difficult to quantify. 253 00:18:52,920 --> 00:18:58,480 So it's, you know, I believe when we did the non annexation agreements and Scott and Hailey, 254 00:18:58,480 --> 00:18:59,480 correct me if I'm wrong. 255 00:18:59,480 --> 00:19:03,640 I believe the city initiated some of that with respect to the non annexation agreements 256 00:19:03,640 --> 00:19:09,000 to particular to address the donut holes within our city limits. 257 00:19:09,000 --> 00:19:12,760 So maybe we were a little proactive in that regard, but Scott, do you have anything else 258 00:19:12,760 --> 00:19:13,760 to add? 259 00:19:13,760 --> 00:19:17,620 Yeah, I would say over the past five years, we've probably had a half dozen people that 260 00:19:17,620 --> 00:19:21,000 have approached the city to get into an agreement for a variety of reasons. 261 00:19:21,000 --> 00:19:26,480 So it's infrequent, so had a conversation today, actually. 262 00:19:26,480 --> 00:19:30,080 And infrequency doesn't necessarily mean it doesn't, it doesn't happen, right? 263 00:19:30,080 --> 00:19:35,800 Infrequency just means that it wasn't necessarily a necessity earlier on or it wasn't on the 264 00:19:35,800 --> 00:19:36,800 front of the line. 265 00:19:36,800 --> 00:19:39,200 Correct, it's another tool in the toolbox for a property owner and/or staff to be able 266 00:19:39,200 --> 00:19:40,200 to use. 267 00:19:40,200 --> 00:19:46,040 And if it's put out there, if it's advertised, I know this is too early, but one thing that 268 00:19:46,040 --> 00:19:48,800 I think I got a modification I have to come back to on that strategy. 269 00:19:48,800 --> 00:19:51,440 So I don't know if I share it now or... 270 00:19:51,440 --> 00:19:52,440 Nope, we're not there yet. 271 00:19:52,440 --> 00:19:53,440 Got it. 272 00:19:53,440 --> 00:19:56,360 I would just add, you know, one of the other things that's going to drive that conversation 273 00:19:56,360 --> 00:20:01,000 with landowners and is the availability of infrastructure. 274 00:20:01,000 --> 00:20:06,160 Because in many cases, water and sewer is not available, and so they're looking to how 275 00:20:06,160 --> 00:20:09,560 do they get water and sewer extended, and it's not uncommon that development community 276 00:20:09,560 --> 00:20:13,760 is also looking to the city to see if there's any financial resources to be able to contribute 277 00:20:13,760 --> 00:20:15,560 towards that extension of utilities. 278 00:20:15,560 --> 00:20:19,560 So that also helps in being able to solicit and having that conversation, much like with 279 00:20:19,560 --> 00:20:22,640 some of the developments that we're having happen on our west side of town. 280 00:20:22,640 --> 00:20:26,440 They've got an infrastructure cost associated with it, and so they're looking to us to see 281 00:20:26,440 --> 00:20:28,440 if we might be willing to participate in that. 282 00:20:28,440 --> 00:20:36,280 And so the lack of utilities in an area can help with initiating that conversation to 283 00:20:36,280 --> 00:20:37,280 begin with. 284 00:20:37,280 --> 00:20:43,160 And Commissioner, I can later on give you some case studies where we have recommended 285 00:20:43,160 --> 00:20:49,360 this strategy specifically to protect open space and land in two cities in the Metroplex 286 00:20:49,360 --> 00:20:50,800 and how that was done. 287 00:20:50,800 --> 00:20:54,280 We plan to put that in the action steps. 288 00:20:54,280 --> 00:20:57,400 For the sake of time, I don't think I'll necessarily need it if the other commissioners want to 289 00:20:57,400 --> 00:21:01,920 hear it, but I think that if it's been used in the past, I'll trust the experts in the 290 00:21:01,920 --> 00:21:02,920 historical side of things. 291 00:21:02,920 --> 00:21:06,920 I think just maybe for me, it's coming down to a point of notification and awareness, 292 00:21:06,920 --> 00:21:08,920 and so we'll come back to that in modifications. 293 00:21:08,920 --> 00:21:09,920 So thanks. 294 00:21:09,920 --> 00:21:10,920 Thank you. 295 00:21:10,920 --> 00:21:11,920 Commissioner Cole. 296 00:21:11,920 --> 00:21:13,960 Thank you, Chair. 297 00:21:13,960 --> 00:21:22,680 Real quick, Tina, you know, we talked about ETJ1 being able to get brought into the city, 298 00:21:22,680 --> 00:21:28,640 but can't the opposite now work, where ETJ1 can punch out and go the other way? 299 00:21:28,640 --> 00:21:29,640 That is true. 300 00:21:29,640 --> 00:21:33,200 Given the recent changes in the state statute earlier this year, that is true. 301 00:21:33,200 --> 00:21:38,320 Property owners can petition to be removed from the ETJ. 302 00:21:38,320 --> 00:21:42,480 That makes it even more difficult, because when they have removed themselves from the 303 00:21:42,480 --> 00:21:48,520 ETJ, then our subdivision regulations even come into question being able to be applied. 304 00:21:48,520 --> 00:21:50,880 Commissioner Prout. 305 00:21:50,880 --> 00:21:58,560 Yeah, just a question on the, I guess, the overall land development strategies. 306 00:21:58,560 --> 00:22:05,480 I'm trying to remember exactly, early on, there was some development of a projected 307 00:22:05,480 --> 00:22:12,400 growth and therefore amount of homes that we expected in this area. 308 00:22:12,400 --> 00:22:18,520 Would you expect the development pressure within this area to be influenced by the amount 309 00:22:18,520 --> 00:22:22,640 of development that is allowed elsewhere in the city? 310 00:22:22,640 --> 00:22:25,960 In this area, though, not elsewhere in the city. 311 00:22:25,960 --> 00:22:27,520 So let me restate. 312 00:22:27,520 --> 00:22:33,640 Would you expect the development pressure as far as how, yeah, within Northeast Denton 313 00:22:33,640 --> 00:22:39,760 to be increased or decreased, depending on how much development is allowed in the rest 314 00:22:39,760 --> 00:22:41,400 of the city? 315 00:22:41,400 --> 00:22:44,760 How much supply is coming online in other areas? 316 00:22:44,760 --> 00:22:50,160 It's difficult to say, but probably not, because development is locational. 317 00:22:50,160 --> 00:22:56,640 And so, rest of the city, maybe their supply, but with outer looping here, development coming 318 00:22:56,640 --> 00:23:03,560 from Aubrey, 380, 428, those are the factors that the developers really like and the market 319 00:23:03,560 --> 00:23:05,360 likes for development. 320 00:23:05,360 --> 00:23:10,760 And so, that's what's going to drive development here, is people are going to want to live 321 00:23:10,760 --> 00:23:15,560 here, people are going to want to get around the metroplex from here, because this will 322 00:23:15,560 --> 00:23:22,720 be the new area, this will be the fast connecting area, this is where the new things are going 323 00:23:22,720 --> 00:23:29,000 to come because of all the development that's coming from south as well as the east towards 324 00:23:29,000 --> 00:23:30,000 here. 325 00:23:30,000 --> 00:23:34,960 And Shai, if I could add to that also, I think the size of the tracts of land that are available 326 00:23:34,960 --> 00:23:37,640 for development are going to play into that as well, right? 327 00:23:37,640 --> 00:23:41,380 Because some of the larger tracts of land are available more on the periphery areas 328 00:23:41,380 --> 00:23:43,720 of the city compared to the interior. 329 00:23:43,720 --> 00:23:48,560 So I know your email that you had sent to the staff in some past conversations that 330 00:23:48,560 --> 00:23:52,400 we've had, I know you've been interested in trying to focus development more inward 331 00:23:52,400 --> 00:23:59,480 into the city, providing increased densities within the city, but the land inside the loop, 332 00:23:59,480 --> 00:24:03,880 if you will, at least, those are smaller tracts, those larger tracts have already been developed, 333 00:24:03,880 --> 00:24:07,560 and so for developers who are interested in doing larger tract development, particularly 334 00:24:07,560 --> 00:24:12,080 single family residential neighborhoods, hence why they look beyond the loop. 335 00:24:12,080 --> 00:24:19,160 Okay, I understand all that, I'm surprised by the response. 336 00:24:19,160 --> 00:24:23,680 I think what I'm hearing is that staff doesn't believe that will actually happen, that there 337 00:24:23,680 --> 00:24:28,600 will be more development within the core of Denton in the next 20 years, and therefore 338 00:24:28,600 --> 00:24:32,120 we have to plan for this amount of growth out there. 339 00:24:32,120 --> 00:24:40,840 Because certainly, I mean, if in an imaginary situation, 50,000 homes were built in other 340 00:24:40,840 --> 00:24:46,120 areas of Denton, I don't see how that doesn't affect the demand for additional homes in 341 00:24:46,120 --> 00:24:49,320 Northeastern, I just don't understand. 342 00:24:49,320 --> 00:24:53,240 And what we would do, though, is where there are tracts available, try to steer developers 343 00:24:53,240 --> 00:24:58,000 towards that, there may not be as large tracts development that are more into the city. 344 00:24:58,000 --> 00:25:01,760 The other thing is the city would have to have a conversation, and I know our comprehensive 345 00:25:01,760 --> 00:25:05,800 plan addresses this to some extent, regarding if we are going to allow for densification 346 00:25:05,800 --> 00:25:09,120 of development, where does that occur? 347 00:25:09,120 --> 00:25:12,440 As you're well aware of, we're going on the downtown plan, if we're looking at trying 348 00:25:12,440 --> 00:25:17,560 to attract higher density development to be able to support businesses that are within 349 00:25:17,560 --> 00:25:21,280 the downtown area, then is it appropriate to increase the density? 350 00:25:21,280 --> 00:25:22,720 It possibly is. 351 00:25:22,720 --> 00:25:26,240 But we would have to look at other areas of the city to see where does it make sense to 352 00:25:26,240 --> 00:25:30,320 be able to add those housing options, and what do those housing options look like? 353 00:25:30,320 --> 00:25:33,840 Because the housing options that are offered more towards the interior of the city, especially 354 00:25:33,840 --> 00:25:38,400 if they're greater density and development, are likely going to be different compared 355 00:25:38,400 --> 00:25:44,320 to where you may see in other areas of the city, such as in Northeast Dunton. 356 00:25:44,320 --> 00:25:50,760 And there's future strategies here to do what you are alluding to, so the city would have 357 00:25:50,760 --> 00:25:56,240 to take certain actions to drive a lot of it towards there. 358 00:25:56,240 --> 00:26:00,680 Completely understand that there's a whole bunch of stuff that's out of scope of the 359 00:26:00,680 --> 00:26:01,680 Northeast area. 360 00:26:01,680 --> 00:26:06,000 I'm just trying to understand what are the trade-offs and push-pull situations. 361 00:26:06,000 --> 00:26:08,520 Thank you. 362 00:26:08,520 --> 00:26:10,320 Anybody else at this break? 363 00:26:10,320 --> 00:26:11,320 No? 364 00:26:11,320 --> 00:26:12,320 Okay. 365 00:26:12,320 --> 00:26:13,320 Go ahead. 366 00:26:13,320 --> 00:26:17,600 So, infrastructure development strategies. 367 00:26:17,600 --> 00:26:22,140 The first one is complete streets, context-sensitive street designs. 368 00:26:22,140 --> 00:26:29,200 Complete streets just means all modes, not just the car, but walking, biking, maybe even 369 00:26:29,200 --> 00:26:30,200 transit. 370 00:26:30,200 --> 00:26:37,120 Street-sensitive usually has been used in an urban context, but this is a rural context, 371 00:26:37,120 --> 00:26:43,720 so as you can see, all it means is what is the area wanting to be, and let's design our 372 00:26:43,720 --> 00:26:47,720 roadways and cross-sections to be compatible with it. 373 00:26:47,720 --> 00:26:53,640 Three-lane divided or undivided with curb and gutter is not going to give you the feel 374 00:26:53,640 --> 00:27:02,560 of a rural area, whereas maybe travel lanes with bioswales in between trees, larger open 375 00:27:02,560 --> 00:27:09,780 spaces next to the walking paths, those are the kind of things that will create that context 376 00:27:09,780 --> 00:27:16,060 of a rural environment, so that's to maintain that character and then also to promote safety 377 00:27:16,060 --> 00:27:18,880 in biking and walking in the area. 378 00:27:18,880 --> 00:27:22,520 People have told us that that's what they would love to do in the area, and they're 379 00:27:22,520 --> 00:27:26,360 already very upset about not being safe. 380 00:27:26,360 --> 00:27:31,960 They remember being kids and riding their bikes, and so this is a strategy to help with 381 00:27:31,960 --> 00:27:34,220 that. 382 00:27:34,220 --> 00:27:42,040 Just a connected strategy to this is to amend the traditional cross-section, street cross-sections 383 00:27:42,040 --> 00:27:48,900 that are all over Denton and frankly all over the Metroplex into creating that rural character 384 00:27:48,900 --> 00:27:58,720 and context-sensitive area that is compatible with the feel and the vision that people have, 385 00:27:58,720 --> 00:28:01,880 and that just means, again, adding bioswales. 386 00:28:01,880 --> 00:28:07,280 You can see what the street looks like now, and then if you just, you've got the right 387 00:28:07,280 --> 00:28:12,440 of way, if you just added bioswales instead of that curb and gutter and just flat land 388 00:28:12,440 --> 00:28:19,120 and put trees, it'll give you the feeling of being nestled in this natural tree line, 389 00:28:19,120 --> 00:28:20,360 things like that. 390 00:28:20,360 --> 00:28:26,120 So that's your strategy seven is to amend that transportation manual. 391 00:28:26,120 --> 00:28:32,600 And then strategy eight is to develop a network of trails to connect people and places in 392 00:28:32,600 --> 00:28:39,680 the community to create safety, to provide opportunities for outdoor recreation, and 393 00:28:39,680 --> 00:28:47,440 of course, healthy lifestyles and site impact is increased value for the nearby properties. 394 00:28:47,440 --> 00:28:55,100 So we've all seen that the value of property next to these off-street trails is quite higher 395 00:28:55,100 --> 00:28:58,280 than ones that are not close to it. 396 00:28:58,280 --> 00:29:05,340 Again, you can see in every strategy we're putting what page of the North Denton Neighborhood 397 00:29:05,340 --> 00:29:12,760 Association plan, these ideas were mentioned, and we're just talking about how you can actually 398 00:29:12,760 --> 00:29:14,400 get it done. 399 00:29:14,400 --> 00:29:22,360 And so strategy nine, we have to expand transit options both in the employment centers in 400 00:29:22,360 --> 00:29:30,240 the southern portion, but also if we are trying to turn this into a legacy regional asset 401 00:29:30,240 --> 00:29:35,960 or a legacy for the outdoor community, then you're going to have a lot of those weekend 402 00:29:35,960 --> 00:29:41,920 visitors to the nature center or the mountain bike trail or any other open spaces that are 403 00:29:41,920 --> 00:29:48,240 created in this area, at which time you're going to have cars inundating this area. 404 00:29:48,240 --> 00:29:55,200 So having public transit and making sure that people do get to the area, but don't bring 405 00:29:55,200 --> 00:29:58,520 the negative impact of coming to the area. 406 00:29:58,520 --> 00:30:04,920 So that's the reason behind this strategy is to provide for that. 407 00:30:04,920 --> 00:30:09,360 So strategy 10, this is where we'll talk a little bit about that plan. 408 00:30:09,360 --> 00:30:14,920 This is to ensure that traffic does not negatively impact existing residential. 409 00:30:14,920 --> 00:30:21,740 Whatever the future developments happen in the area, we want to take care of the development. 410 00:30:21,740 --> 00:30:31,080 So one of the things, this is the on your left side is the existing thoroughfare plan. 411 00:30:31,080 --> 00:30:32,960 Right side is what we're proposing. 412 00:30:32,960 --> 00:30:40,020 So first thing is we've taken down the primary arterials and turned them into secondary arterials. 413 00:30:40,020 --> 00:30:45,840 So we're taking down the classification for 28 has been moved from freeway classification 414 00:30:45,840 --> 00:30:51,440 to the primary arterial classification. 415 00:30:51,440 --> 00:30:55,600 And then you can see this east west roadway has just been stopped. 416 00:30:55,600 --> 00:30:59,420 It's not continuing on and connecting. 417 00:30:59,420 --> 00:31:03,640 We do have up here, we've added more streets. 418 00:31:03,640 --> 00:31:06,280 The idea is not to go start building them. 419 00:31:06,280 --> 00:31:15,400 The idea is depending on what the proposed outer loop alignment's going to be and then 420 00:31:15,400 --> 00:31:20,960 when it is going to be built and then what type of developments coming in, that's when 421 00:31:20,960 --> 00:31:23,560 you would want to build those. 422 00:31:23,560 --> 00:31:30,240 Right now, same here, if this big tract here does develop, well then you're going to need 423 00:31:30,240 --> 00:31:32,960 a connection here. 424 00:31:32,960 --> 00:31:40,060 But we would recommend that you build this little network right next to say loop 288 425 00:31:40,060 --> 00:31:45,400 and 428 because right now already there's a traffic issue right here and this is the 426 00:31:45,400 --> 00:31:50,200 roadways that will help ease that traffic congestion there. 427 00:31:50,200 --> 00:31:58,560 So down here in the employment area, industrial area, making these few connections is going 428 00:31:58,560 --> 00:32:07,040 to make it a little easier for those trucks to move around and not idle around on the 429 00:32:07,040 --> 00:32:08,040 roadways. 430 00:32:08,040 --> 00:32:16,360 So that's the ten strategies, five strategies for infrastructure. 431 00:32:16,360 --> 00:32:17,360 Commissioner Smith. 432 00:32:17,360 --> 00:32:19,720 Thank you, Chair. 433 00:32:19,720 --> 00:32:25,360 How does changing 428 from being a highway classification, a primary, I should say how, 434 00:32:25,360 --> 00:32:33,080 does changing it and this change how TxDOT might view that road? 435 00:32:33,080 --> 00:32:35,080 They're the ones that have given us that direction. 436 00:32:35,080 --> 00:32:40,280 So shortly, you know, when we went through the mobility update in 2022 and adopted our 437 00:32:40,280 --> 00:32:45,480 mobility plan, at that time we were advised that they were going to make it freeway status. 438 00:32:45,480 --> 00:32:50,240 So we reflected that on our mobility plan and less than a year after having our mobility 439 00:32:50,240 --> 00:32:54,920 plan adopted, they came back and informed us that they decided that that would be primary 440 00:32:54,920 --> 00:32:56,160 arterial status. 441 00:32:56,160 --> 00:33:02,280 So hence the primary arterial status on this plan recommendation to get that updated. 442 00:33:02,280 --> 00:33:11,120 Is that a harbinger for how they feel that road should be improved in the future? 443 00:33:11,120 --> 00:33:16,320 From our indications, it's yes, that's what they're anticipating, is that it would be 444 00:33:16,320 --> 00:33:21,520 that primary arterial, which is typically that six lane divided roadway status. 445 00:33:21,520 --> 00:33:25,120 And David is on our consultant team and on the transportation aspect and may have more 446 00:33:25,120 --> 00:33:26,120 to add. 447 00:33:26,120 --> 00:33:29,240 Before David answers, I'll just say I'll stop beating around the bush and just say what 448 00:33:29,240 --> 00:33:30,240 it is. 449 00:33:30,240 --> 00:33:36,840 If it's called a highway and it's exact same status it is today, two lane undivided and 450 00:33:36,840 --> 00:33:41,600 it goes from being highway classification in TxDOT's mind and now on our mobility plan 451 00:33:41,600 --> 00:33:46,920 to being primary arterial and still the exact same as it is today. 452 00:33:46,920 --> 00:33:50,640 Is that making it less likely that they will come in with a capital improvement project 453 00:33:50,640 --> 00:33:52,720 sooner to improve that roadway? 454 00:33:52,720 --> 00:33:56,320 I guess we do need to classify, the classification is different here. 455 00:33:56,320 --> 00:33:59,040 We've got the city of Denton classification and then you have the classification from 456 00:33:59,040 --> 00:34:00,040 TxDOT. 457 00:34:00,040 --> 00:34:06,800 So TxDOT already identifies 428 as an arterial, not necessarily as a freeway or a other highway 458 00:34:06,800 --> 00:34:10,280 which would be kind of a higher magnitude. 459 00:34:10,280 --> 00:34:16,320 So that's one item and just to note, the TxDOT, at least Dallas district policy on FM roads 460 00:34:16,320 --> 00:34:21,720 has been more proactive where they are looking at any future improvements, they're looking 461 00:34:21,720 --> 00:34:26,360 at how can we make sure that it is a six lane facility and not just a four lane facility 462 00:34:26,360 --> 00:34:30,880 so they're trying to maximize the amount of right of way footprint and that preclude future 463 00:34:30,880 --> 00:34:35,040 improvements in these areas and they're doing that for all the FM roads within the Collin 464 00:34:35,040 --> 00:34:39,000 County and Denton area as we speak now. 465 00:34:39,000 --> 00:34:43,400 But the fact that it's not, the fact that it's a two lane undivided road now, and they 466 00:34:43,400 --> 00:34:46,800 originally said it's highway, it's not a highway. 467 00:34:46,800 --> 00:34:50,680 If it's now a primary arterial in their mind, does that make it less likely that there would 468 00:34:50,680 --> 00:34:54,520 be addressing the expansion of 428 sooner? 469 00:34:54,520 --> 00:34:57,200 Does that make sense that if it's, hey we think that's a highway and the highway I'm 470 00:34:57,200 --> 00:35:01,820 guessing, I'm just going to make it up, is an eight lane divided road and right now it's 471 00:35:01,820 --> 00:35:08,240 freeway sorry, and right now it's two lane undivided, therefore it's so far out of compliance 472 00:35:08,240 --> 00:35:12,760 for their mobility plan, we need to address that sooner, but now they reclassify it as 473 00:35:12,760 --> 00:35:18,800 being a primary arterial which is a three lane divided and it's right now it's two 474 00:35:18,800 --> 00:35:23,280 lane undivided because we changed it from being a freeway down to being primary arterial, 475 00:35:23,280 --> 00:35:27,920 they're deprioritizing the improvement of that road, does that make sense? 476 00:35:27,920 --> 00:35:35,200 I would say not necessarily, you know we work extensively with TechStop regarding roadways 477 00:35:35,200 --> 00:35:47,480 that are in need of attention and working with them on which areas are priorities for 478 00:35:47,480 --> 00:35:48,480 the community. 479 00:35:48,480 --> 00:35:54,440 So it's, I mean we meet with them regularly, they do seek our feedback, I mean we're working 480 00:35:54,440 --> 00:36:01,320 with them extensively on the 380 direct connector, also we've been influential in working with 481 00:36:01,320 --> 00:36:05,920 them on what we believe our needs are as it relates to loop 288 and the need for frontage 482 00:36:05,920 --> 00:36:15,160 roads there, so the timing of the growth that happens within an area also influences the 483 00:36:15,160 --> 00:36:21,480 timing of highway improvements being completed or freeway improvements or even improvements 484 00:36:21,480 --> 00:36:25,040 probably to you know FM roads that TechStop has. 485 00:36:25,040 --> 00:36:32,820 So it's you know they're taken into consideration regional growth that happens and then also 486 00:36:32,820 --> 00:36:37,480 funding sources that are available in another community that I worked in. 487 00:36:37,480 --> 00:36:45,120 The phase two widening of I-35 was escalated about 20 years because the voters of Texas 488 00:36:45,120 --> 00:36:54,480 approved additional funding in a previous election many years ago that accelerated funding 489 00:36:54,480 --> 00:36:59,320 being available and then because of the amount of traffic, the significance of the road within 490 00:36:59,320 --> 00:37:05,440 the area there were all these various different factors that went into them moving that expansion 491 00:37:05,440 --> 00:37:09,760 to the forefront and a road that we thought wasn't going to be touched until the year 492 00:37:09,760 --> 00:37:15,360 2030 all of a sudden is getting addressed in the year 2020. 493 00:37:15,360 --> 00:37:20,680 Yeah I think the bottom line is the classification isn't the only driving factor, correct? 494 00:37:20,680 --> 00:37:25,800 Yeah originally TechStop didn't have funding for 428 and to my knowledge they haven't 495 00:37:25,800 --> 00:37:30,800 added or changed any added funding to 428 when it got put down to an arterial. 496 00:37:30,800 --> 00:37:31,800 Okay thank you. 497 00:37:31,800 --> 00:37:38,480 And the only reason to have this in the plan is so that the property owners along the site 498 00:37:38,480 --> 00:37:44,480 know what to expect so the type of development they would have planned for if it was a freeway 499 00:37:44,480 --> 00:37:49,640 versus if it's an arterial then that gets different. 500 00:37:49,640 --> 00:37:52,000 Thank you. 501 00:37:52,000 --> 00:37:57,160 Anybody else on this round of strategies, questions or clarification? 502 00:37:57,160 --> 00:37:58,160 Commissioner Pruitt? 503 00:37:58,160 --> 00:38:00,680 Thank you Chair. 504 00:38:00,680 --> 00:38:06,240 First just in general on the infrastructure strategies I didn't see anything in here 505 00:38:06,240 --> 00:38:13,520 about some of the utility things that are sort of non-road infrastructure. 506 00:38:13,520 --> 00:38:23,080 Help me understand why that's not a big concern for this area. 507 00:38:23,080 --> 00:38:30,200 So it is and we've looked at well you cannot answer too but let me quickly answer we looked 508 00:38:30,200 --> 00:38:38,680 at it and we've looked at the city's five-year capital plan there are water sewer lines planned 509 00:38:38,680 --> 00:38:45,320 but they're way far off so if the idea is to preserve this area then you don't want 510 00:38:45,320 --> 00:38:49,080 to recommend water sewer being provided. 511 00:38:49,080 --> 00:38:55,920 The only reason this area has not exploded like Aubrey has is because there's no water 512 00:38:55,920 --> 00:38:56,920 sewer. 513 00:38:56,920 --> 00:39:00,360 So that's one of the reasons we did not go there. 514 00:39:00,360 --> 00:39:04,520 People are still driving so we had to talk about the roads. 515 00:39:04,520 --> 00:39:08,000 It wasn't shown on the typicals but typically the typical section allows for those utility 516 00:39:08,000 --> 00:39:14,600 corridors to run adjacent to those facilities so that would be incorporated as well in there. 517 00:39:14,600 --> 00:39:20,040 Sure from a right-of-way availability perspective I'm thinking more from a capital improvement 518 00:39:20,040 --> 00:39:26,880 perspective right near this area there's been a you know proposed project of an additional 519 00:39:26,880 --> 00:39:33,160 water treatment plant or sewage treatment plant sorry to mix my terms and I'm not a 520 00:39:33,160 --> 00:39:44,560 civil engineer here but the I guess I'm trying to understand I don't want to go into detail. 521 00:39:44,560 --> 00:39:51,680 It seems to me like the decisions that we make going forward for this area there may 522 00:39:51,680 --> 00:39:59,460 be certain step sizes of amount of intensity or homes in certain areas that would trigger 523 00:39:59,460 --> 00:40:05,560 additional lift stations additional sewage treatment plants that would be helpful to 524 00:40:05,560 --> 00:40:11,160 understand just from a optimization perspective if that makes sense so I was I was just surprised 525 00:40:11,160 --> 00:40:12,160 to not see it. 526 00:40:12,160 --> 00:40:19,120 So the strategy here is to discourage development okay so if the city's not planning anything 527 00:40:19,120 --> 00:40:24,720 then people know that okay if you're going to develop oh sorry if you're going to develop 528 00:40:24,720 --> 00:40:29,980 then you're going to spend that kind of money to build that infrastructure or at least to 529 00:40:29,980 --> 00:40:39,480 know that it's not planned so okay that was a typical strategy to prevent okay sorry and 530 00:40:39,480 --> 00:40:46,160 Eric if I can add to that also one of the things that our water wastewater utility team 531 00:40:46,160 --> 00:40:52,960 is doing is they are working on a water and wastewater master plan they work very closely 532 00:40:52,960 --> 00:40:58,160 with us to understand development conditions that are happening within the area and to 533 00:40:58,160 --> 00:41:03,680 be able to plan accordingly so you know we continue to work with them and advise them 534 00:41:03,680 --> 00:41:10,140 of you know here's what we're seeing happening within the ETJ where we can't control the 535 00:41:10,140 --> 00:41:15,440 land use but this is what we're seeing happen within the areas of the city limits here the 536 00:41:15,440 --> 00:41:21,960 land uses that are being recommended or in this case you know strong preservation of 537 00:41:21,960 --> 00:41:27,080 environmental resources and preservation of land and so they're able to factor that into 538 00:41:27,080 --> 00:41:32,280 their assumptions and then they continue to monitor that over time as well okay and as 539 00:41:32,280 --> 00:41:42,960 you can see all the city land here is pretty close to the existing utilities and so we 540 00:41:42,960 --> 00:41:50,000 didn't want to actually provide reason for people to yeah so I think now that I'm parsing 541 00:41:50,000 --> 00:41:58,720 the words a little bit better the right way to message it correct me if I'm wrong is that 542 00:41:58,720 --> 00:42:04,360 we have things on our long-term plans but we have no funded projects to go out ourselves 543 00:42:04,360 --> 00:42:11,440 and build that infrastructure such that as development occurs in different areas we have 544 00:42:11,440 --> 00:42:18,720 a tool to require connection through a particular route and and size of pipe and that sort of 545 00:42:18,720 --> 00:42:24,040 thing but we we're not actively looking at going out and preemptively putting in that 546 00:42:24,040 --> 00:42:34,760 infrastructure so correct okay thank you and then quick question to staff the the transit 547 00:42:34,760 --> 00:42:41,880 thing seems a little bit out of place from a rural thing but then I see employment centers 548 00:42:41,880 --> 00:42:49,160 I understand there's an area you know south of the railroad tracks just north of 380 I 549 00:42:49,160 --> 00:43:02,480 my question is does the staff feel that having that sorry terminology a strategy thank you 550 00:43:02,480 --> 00:43:16,100 within this plan is is beneficial rather than distractive from transit discussions that 551 00:43:16,100 --> 00:43:23,260 might be more near term and and higher priority does that make sense I don't want to dilute 552 00:43:23,260 --> 00:43:30,840 the amount of effort that we have to spend on improving transit citywide by adding stuff 553 00:43:30,840 --> 00:43:37,440 in places where it might not be needed for 20 years does that make sense I think so and 554 00:43:37,440 --> 00:43:41,900 I think I understand what you're getting at I guess and I know we had several discussions 555 00:43:41,900 --> 00:43:50,280 internally about transit and hence why we were more inclined to think about the employment 556 00:43:50,280 --> 00:44:00,100 centers more on the southern end and so you know if you feel that this is a strategy that 557 00:44:00,100 --> 00:44:05,000 does not need to be included then would be looking for that direction at that time let's 558 00:44:05,000 --> 00:44:13,040 circle back to that discussion given direction yeah yeah I'm good thank you okay anybody 559 00:44:13,040 --> 00:44:20,880 else we got an or the next list of strategies at the moment okay so the next list is economic 560 00:44:20,880 --> 00:44:26,920 development strategies that are four of those we heard a lot about how Denton is unique 561 00:44:26,920 --> 00:44:34,640 and we wanted small businesses that were unique mom and pop kind of businesses in this area 562 00:44:34,640 --> 00:44:40,680 and also in Denton and if we are giving it wanting a rural character that's more in line 563 00:44:40,680 --> 00:44:46,440 with it so this strategy is to create economic development programs and incentives to promote 564 00:44:46,440 --> 00:44:53,520 that small business development in the city and and in the implementation action steps 565 00:44:53,520 --> 00:45:02,080 we will put in how to do that in the different steps but that's why this strategy is here 566 00:45:02,080 --> 00:45:07,080 proactive approach instead of just sitting around and thinking people will open small 567 00:45:07,080 --> 00:45:12,260 business if we have a small business office and incentives it's more likely to get those 568 00:45:12,260 --> 00:45:20,800 kind of businesses this is one of those strategies that we were talking about Commissioner Pruitt 569 00:45:20,800 --> 00:45:28,360 where you said how can we move development somewhere else instead of here so economic 570 00:45:28,360 --> 00:45:34,720 development policies to promote open space conservation and management in this area so 571 00:45:34,720 --> 00:45:39,280 we've got this whole transfer of development rights there are many other ways to do it 572 00:45:39,280 --> 00:45:45,960 like tax incentives for landowners to preserve taxes transfer of development rights land 573 00:45:45,960 --> 00:45:52,440 banking public acquisition but this one we're talking about transfer of development rights 574 00:45:52,440 --> 00:46:00,040 here where you can designate selling areas and you can designate buying area so for example 575 00:46:00,040 --> 00:46:10,520 if this was to be your buying area well it's in the city limits it's got three any any 576 00:46:10,520 --> 00:46:19,760 like this one sorry is three units an acre is your buying area your selling area is can 577 00:46:19,760 --> 00:46:29,040 now sell that for example if everything for example we just say this whole area you can 578 00:46:29,040 --> 00:46:34,000 have three units an acre but we don't want a certain area to develop so we say you can 579 00:46:34,000 --> 00:46:41,680 sell your density to that property up there now they can do five units an acre but you 580 00:46:41,680 --> 00:46:46,560 then put your land in conservation easement so now they cannot develop that land so we're 581 00:46:46,560 --> 00:46:52,800 trying to see if first we start with land in the etj because that we have no control 582 00:46:52,800 --> 00:46:58,720 over so if that can get the selling area that will be good you could do the land around 583 00:46:58,720 --> 00:47:07,040 288 as the buying area and then this northeast ending could be the selling area so then you 584 00:47:07,040 --> 00:47:13,520 can give more density along the loop and then leave this area into a conservation so that's 585 00:47:13,520 --> 00:47:19,440 kind of the concept of transfer development rights this is just a concept we have not 586 00:47:19,440 --> 00:47:25,360 developed this this will need a lot more work to decide what's your base density where are 587 00:47:25,360 --> 00:47:31,440 those selling areas where are those buying areas do we want to do this within this area 588 00:47:31,440 --> 00:47:38,040 or you know some property maybe more you're going to have to look at property values you're 589 00:47:38,040 --> 00:47:43,960 gonna have to look at which property has access to infrastructure which does not all of those 590 00:47:43,960 --> 00:47:49,240 things will have to be taken into consideration when you create this program but this is one 591 00:47:49,240 --> 00:47:55,080 program where you can put this as an example of the selling area you can keep this land 592 00:47:55,080 --> 00:48:02,520 open if this area would buy that in lieu of say landscaping they don't have enough space 593 00:48:02,520 --> 00:48:10,520 to landscape they've they can buy that use the mic oh i'm sorry that's okay because we're 594 00:48:10,520 --> 00:48:18,920 streaming so oh sorry so that's the idea here is to give incentives to people to not develop 595 00:48:18,920 --> 00:48:24,680 their property mostly we do incentives to develop and this is a strategy to give incentives 596 00:48:24,680 --> 00:48:30,520 to people to not develop their property that way you're not taking their property by letting 597 00:48:30,520 --> 00:48:37,720 them not develop you're still letting them get use out of their property and then strategy 13 is 598 00:48:37,720 --> 00:48:44,360 the design standards so each if we can have economic development policies for each of these 599 00:48:44,360 --> 00:48:52,280 land use character areas that is specific to that character area what we want to see in that area 600 00:48:52,280 --> 00:49:00,120 and then we can basically say here's an incentive in return for meeting all these design standards 601 00:49:00,520 --> 00:49:07,720 so as you all know texas legislation has taken away a lot of city's rights to do a lot of things 602 00:49:07,720 --> 00:49:15,640 but you can always give incentives and encourage people to do a development that matches what 603 00:49:15,640 --> 00:49:24,600 you all want to see so that's the strategy here and then strategy 14 is right now especially after 604 00:49:24,600 --> 00:49:31,960 covid we've got a lot of nomadic workforce people can work from anywhere they're looking for open 605 00:49:31,960 --> 00:49:39,080 space and this is a specific demographic that is younger demographic that are very environmentally 606 00:49:39,080 --> 00:49:48,760 conscious they volunteer a lot and they like working and living in rural environments and so 607 00:49:48,760 --> 00:49:57,160 if we actually go looking for them create certain developments for them solicit that recruit those 608 00:49:57,160 --> 00:50:03,240 businesses and amenities that these people like you'll find that they'll be volunteering to take 609 00:50:03,240 --> 00:50:10,680 care of the floodplain and cleaning things up and making sure that they're volunteering to keep the 610 00:50:10,680 --> 00:50:16,760 open space open and preserving the environment so that's the only reason for this is this area look 611 00:50:16,760 --> 00:50:23,160 like a perfect area to if if people are going to move into this area then let's recruit people who 612 00:50:23,160 --> 00:50:31,000 appreciate the area and that was it commissioner smith can i just get clarification on strategy 12 613 00:50:31,000 --> 00:50:36,680 if you can go back to the first second so i know it's not a fully fleshed out policy or standard 614 00:50:36,680 --> 00:50:39,960 within there but just so i can understand what you're trying to say within that 615 00:50:39,960 --> 00:50:44,760 i thought it was more of as i was read through this before the meeting i thought it was more of 616 00:50:45,320 --> 00:50:51,480 we're going to incentivize people to buy in the area something like a you know a tax improvement 617 00:50:51,480 --> 00:50:56,680 district or something like that and then we're going to de-incentivize the selling area from 618 00:50:56,680 --> 00:51:00,840 whatever development agreements things like that we've already talked about what you're saying is 619 00:51:00,840 --> 00:51:06,600 that if somebody exists in the buying area and they can't meet the landscape requirements that 620 00:51:06,600 --> 00:51:10,200 are laid out or density they want more density they want more density or something like that 621 00:51:10,760 --> 00:51:16,600 they have to go talk to a totally separate owner and buy the land and then put into a conservation 622 00:51:16,600 --> 00:51:22,600 easement so what they would do is they would buy the units so that's how you would define it you 623 00:51:22,600 --> 00:51:29,960 know certain units so they would buy a certain amount of units from that buying person and that 624 00:51:29,960 --> 00:51:35,560 much land that buying person would have to put into a conservation easement that they can no longer 625 00:51:35,560 --> 00:51:39,560 develop that land because they've sold the development but they are physically buying the 626 00:51:39,560 --> 00:51:45,960 land from a they're so it's more like it's more like our our park dedication fund piece things 627 00:51:45,960 --> 00:51:49,880 right where it's like you have to dedicate a certain amount of units some amount of acres per 628 00:51:49,880 --> 00:51:58,520 unit you're developing or in lieu give us money somewhat similar but it's different because it's 629 00:51:58,520 --> 00:52:04,920 dealing with the land use right so maybe another way to explain this would be is if i own a piece 630 00:52:04,920 --> 00:52:10,840 of property and let's say i can put a thousand units on it given its existing zoning or if it 631 00:52:10,840 --> 00:52:15,880 was out in the etj and i wanted to bring it in and the city's plan says residential you know this 632 00:52:15,880 --> 00:52:20,840 density recommendation but bottom line i've figured out i could put a thousand units on the property 633 00:52:20,840 --> 00:52:27,800 but i am open to conserving my property and putting a conservation easement on it because 634 00:52:27,800 --> 00:52:31,560 let's say i've got some cool feature on my property right that would be really neat to 635 00:52:31,560 --> 00:52:37,560 preserve but i know you tim you know neighbor down the street has a piece of property you're 636 00:52:37,560 --> 00:52:42,360 wanting to develop and you would love to have additional units you'd love to have my thousand 637 00:52:42,360 --> 00:52:50,200 units right then we would enter into an agreement i believe the city would be this is where i'm a 638 00:52:50,200 --> 00:52:54,120 little unknown on this the city would probably be involved because there would probably be some sort 639 00:52:54,120 --> 00:52:58,440 of development agreement especially if we're involving land in etj but there would be some 640 00:52:58,440 --> 00:53:04,120 sort of agreement in addition to any conservation easement put on my property but that would speak 641 00:53:04,120 --> 00:53:09,960 to you being able to receive my thousand units and being able to develop that on your property 642 00:53:09,960 --> 00:53:17,080 but then protections being put in place that my property continues to have that conservation 643 00:53:17,080 --> 00:53:21,400 easement and or whatever what other strategy might have been used to ensure that my property 644 00:53:21,400 --> 00:53:27,160 doesn't develop transfer of development rights in my experience is not something that has been 645 00:53:27,160 --> 00:53:31,880 necessarily readily used probably throughout texas most of my experiences predominantly in the north 646 00:53:31,880 --> 00:53:38,840 dallas area so i can't speak to some other areas of the state i know in other parts of the country 647 00:53:38,840 --> 00:53:45,960 this is a popular strategy that's used especially in much more urban densities shy might know some 648 00:53:45,960 --> 00:53:52,840 other examples but this this is a a tool that's out there it's just not something that is probably 649 00:53:52,840 --> 00:53:57,800 exercised regularly just because of the complexities but also needing to have finding 650 00:53:57,800 --> 00:54:02,440 those two property owners that want to have that relationship because the other thing is if i'm 651 00:54:02,440 --> 00:54:06,840 giving up some development rights on my property i'm probably looking to for you to pay me for those 652 00:54:06,840 --> 00:54:13,000 as well so there's that component that comes into play okay so i understand it more like how i know 653 00:54:13,000 --> 00:54:18,280 how um ev regulation is going in some states like california for example you have to sell a certain 654 00:54:18,280 --> 00:54:23,320 amount of units amount of you if you sell 100 units from a dealership in one month 50 of those 655 00:54:23,320 --> 00:54:29,080 units have to be electric vehicles have to be evs if you don't have evs as a dealer you can buy ev 656 00:54:29,080 --> 00:54:33,400 credits from another dealership so you can go buy those ev a lot of times they're buying it from 657 00:54:33,400 --> 00:54:36,520 tesla and that's how tesla makes a bunch of money so it sounds like it's very similar to that where 658 00:54:36,520 --> 00:54:42,920 it's like we have a commodity in the sense of units of conservation and i can buy and trade my 659 00:54:42,920 --> 00:54:48,120 units of conservation in exchange for units of density back and forth to be able to fall into 660 00:54:48,120 --> 00:54:52,600 regulations is that is that a good summation of understanding what that is i'm going to defer to 661 00:54:52,600 --> 00:54:57,480 shy on this one does that the only the only only concern i have on that or understanding is that 662 00:54:57,480 --> 00:55:02,760 how does that fall into zoning regulation you i won't use a thousand let's say there's 100 acres 663 00:55:02,760 --> 00:55:07,880 and the zoning on that land is five units per acre so technically you could do 500 units 664 00:55:09,000 --> 00:55:14,440 but i want to do this exchange right i actually want to do 700 units you've got 200 units you're 665 00:55:14,440 --> 00:55:20,040 willing to you know sell to me i buy it off of you in exchange for conservation units and cash 666 00:55:20,040 --> 00:55:25,480 and that kind of stuff right i'm now going to be developing or have the right to develop them at a 667 00:55:25,480 --> 00:55:31,160 seven unit per acre density even though my zoning is five units per acre i would anticipate that we 668 00:55:31,160 --> 00:55:35,240 would change the zoning also to be able to address that but i'm going to defer to shy because she's 669 00:55:35,240 --> 00:55:40,760 got more knowledge on this than i do so the way you would write the ordinance would be your base 670 00:55:40,760 --> 00:55:48,840 zoning is this many units and if you were to be able because you're in a buying area you can max 671 00:55:48,840 --> 00:55:57,640 buy up to these many units so you can go a low and a high and you say you can buy up to this much 672 00:55:57,640 --> 00:56:05,000 and in the selling part the because they're selling it then we they have to put it into a conservation 673 00:56:05,000 --> 00:56:12,200 easement that much area so we would define how much land equals how many units okay that's all 674 00:56:12,200 --> 00:56:17,720 questions i have thank you chair okay you're welcome anyone else okay 675 00:56:17,720 --> 00:56:26,920 so those were our economic development strategies uh michael will you take on the environmental 676 00:56:26,920 --> 00:56:33,960 strategies thank you good evening commissioner chair 677 00:56:33,960 --> 00:56:41,160 so with environmental preservation strategies we have five specific strategies that we'll review 678 00:56:41,160 --> 00:56:50,360 get that up there there we go and we're going to start with strategy 15 which is adopt regulations 679 00:56:50,360 --> 00:56:57,160 that provide for appropriate vegetative riparian buffers along all major streams and tributaries 680 00:56:57,160 --> 00:57:04,680 this section is a nice illustration of what a healthy riparian corridor looks like where you have 681 00:57:04,680 --> 00:57:13,960 essentially a natural condition within the main channel and then that gradually transitions out 682 00:57:14,680 --> 00:57:23,160 to developed areas in between the creek and the development areas you're providing what we call 683 00:57:23,160 --> 00:57:29,480 green infrastructure nature-based infrastructure that mitigates any of the impacts of development 684 00:57:29,480 --> 00:57:39,320 adjacent to the creeks and so when we look at the northeast area most of the creeks have established 685 00:57:39,320 --> 00:57:44,440 flood plains that are mapped through fema but many of the tributaries have not been mapped as 686 00:57:44,440 --> 00:57:50,840 fema flood plain but those are also significant in terms of riparian corridors so this applies 687 00:57:50,840 --> 00:57:54,440 to all the tributaries not just the major streams 688 00:57:54,440 --> 00:58:09,960 so linked to that is also tying it to prioritizing bike pedestrian and equestrian transportation 689 00:58:09,960 --> 00:58:15,560 corridors along and within the riparian buffers to create a connected greenway system so it kind 690 00:58:15,560 --> 00:58:22,440 of lumps in stacks the functionality of your riparian corridors where the riparian buffers 691 00:58:22,440 --> 00:58:28,360 are established now within the city of denton as environmentally sensitive areas it really just 692 00:58:28,360 --> 00:58:36,040 designates a 50 foot or 100 foot width away from the banks but it doesn't get into the details about 693 00:58:36,040 --> 00:58:43,400 what goes in that buffer so this strategy would be developing a more detailed structure you can 694 00:58:43,400 --> 00:58:49,720 think of it like a like a roadway section so what is in your riparian corridor section 695 00:58:49,720 --> 00:58:56,120 and that could include both paved and unpaved pedestrian trails equestrian trails but it would 696 00:58:56,120 --> 00:59:01,560 be linked up with this nature-based infrastructure that would mitigate any impacts within that 697 00:59:01,560 --> 00:59:06,680 corridor so you can look at the trail as that's development so you want to mitigate the water 698 00:59:06,680 --> 00:59:16,680 that's coming off that new hardscape within the buffer this creates a large network of greenways 699 00:59:16,680 --> 00:59:24,600 throughout northeast denton and keep in mind that this wouldn't be your only trails depending on 700 00:59:24,600 --> 00:59:30,440 what development comes in you would want pedestrian connectivity into your major greenway system 701 00:59:30,440 --> 00:59:35,480 so obviously you would probably have one along clear creek which is the larger riparian corridor 702 00:59:35,480 --> 00:59:41,880 but you would also want that pedestrian connectivity along the roadways and within 703 00:59:41,880 --> 00:59:46,280 the public open spaces that connect you to the creek so you don't just have the hike and bike 704 00:59:46,280 --> 00:59:52,360 corridors in the floodplain and in the riparian corridors that expand and extends out into the 705 00:59:52,360 --> 01:00:01,880 development so adding on to that and this is something that could exist within the riparian 706 01:00:01,880 --> 01:00:09,640 corridors but it would also exist in any proposed development and it's prioritizing what I call 707 01:00:09,640 --> 01:00:14,840 shared use and multi-benefit nature-based infrastructure that would include best 708 01:00:14,840 --> 01:00:21,800 management practices such as bioswales bioretention enhanced swells enhanced stormwater detention and 709 01:00:21,800 --> 01:00:27,640 retention and that could be located within the riparian buffers and it could also be located 710 01:00:27,640 --> 01:00:32,760 within open spaces if you have a development that is draining to that open space that isn't 711 01:00:32,760 --> 01:00:38,440 necessarily in a creek corridor you would have a shared open space that also provides the stormwater 712 01:00:38,440 --> 01:00:45,320 management infrastructure but it also allows you to begin to look at restorative practices to 713 01:00:45,320 --> 01:00:51,800 restore riparian vegetation increase canopy to start looking at and we'll talk about this in the 714 01:00:51,800 --> 01:00:58,360 next strategy restoring the tall grass prairie and protecting the tall grass prairie that that already 715 01:00:58,360 --> 01:01:05,560 exists so when you think about stormwater management I know many of you have seen 716 01:01:05,560 --> 01:01:11,400 developments that have like a detention pond that generally is going to be off to the back of a 717 01:01:11,400 --> 01:01:17,720 property those don't provide a lot of stacked functionality it serves the purpose of managing 718 01:01:17,720 --> 01:01:22,840 the flood volumes it serves some purposes of treating the water quality of the development 719 01:01:22,840 --> 01:01:28,680 runoff but it's not necessarily somewhere that you want to go recreate around so this strategy 720 01:01:28,680 --> 01:01:34,600 would help the city develop a very detailed 721 01:01:37,080 --> 01:01:42,120 section of when you're looking at these stormwater management facilities and prioritizing making 722 01:01:42,120 --> 01:01:47,000 sure that they provide multiple benefits and they're not just there to manage stormwater 723 01:01:47,000 --> 01:01:57,800 and shy I think you wanted to talk a little bit about this yes so you can see on the right hand 724 01:01:57,800 --> 01:02:07,400 side is a example of tall grass prairie restoration this is a development in next to denver colorado 725 01:02:07,400 --> 01:02:13,880 it's called central park neighborhood and I toured it recently just last month actually 726 01:02:13,880 --> 01:02:20,440 and this was something I looked at and I thought this is amazing as a development because what they 727 01:02:20,440 --> 01:02:28,840 did was it was twofold it's full of parks it's this is what every house sees from their front 728 01:02:28,840 --> 01:02:36,440 door every house in that neighborhood sees this main central park area which is a restored prairie 729 01:02:36,440 --> 01:02:43,240 tall grass prairie development they do have other parks in the area but this is how they have 730 01:02:43,960 --> 01:02:52,920 been able to develop housing development with this and the fact was because the developer 731 01:02:52,920 --> 01:02:59,000 got to be a got to develop the density of and it's all single-family homes in that neighborhood 732 01:02:59,000 --> 01:03:05,240 but they're not five acres so they're small next to each other but because he got that they were 733 01:03:05,240 --> 01:03:11,480 able to spend the money in developing this park system and making sure that that feel of the 734 01:03:11,480 --> 01:03:19,240 rural environment where every door looks out into this as well as they maintain they built it and 735 01:03:19,240 --> 01:03:25,240 gave it to the city the main park but then eight other parks they maintain the development does 736 01:03:25,240 --> 01:03:32,040 and this is the part that Michael was talking about was that multiple function 737 01:03:33,160 --> 01:03:42,440 all their parks have stormwater detention retention elements in it but they are 738 01:03:42,440 --> 01:03:48,840 recreation elements they don't look like just developing the water so i just wanted to say 739 01:03:48,840 --> 01:03:53,160 anybody who has a chance please go take a look at that central park neighborhood 740 01:03:53,160 --> 01:03:57,480 and how it's been developed i think brookfield developers did that one 741 01:04:00,280 --> 01:04:07,640 i think shy and both the tall grass prairie areas there are existing areas where it's 742 01:04:07,640 --> 01:04:13,880 fairly healthy within northeastern area and there are areas where it's remnant tall grass prairie 743 01:04:13,880 --> 01:04:21,480 and it's been impacted by agricultural processes over over time so you have opportunities to be 744 01:04:21,480 --> 01:04:26,680 restorative throughout the area and that would be tied to developer agreements exchange of development 745 01:04:26,680 --> 01:04:32,440 rights and all that but it would be dictated by the city for example let's say you had a property 746 01:04:32,440 --> 01:04:40,360 that had two acres of remnant tall grass prairie as identified in the esa's you could have requirements 747 01:04:40,360 --> 01:04:46,760 for that development to either preserve that existing tall grass prairie or restore it the 748 01:04:46,760 --> 01:04:53,320 idea is we're trying to increase the amount of tall grass prairie and then bundle it into shared 749 01:04:53,320 --> 01:05:04,920 public open spaces the final strategy is related to the many existing stock ponds 750 01:05:04,920 --> 01:05:14,200 throughout the area stock ponds were initially constructed to provide irrigation water water 751 01:05:14,200 --> 01:05:21,560 for livestock etc but also to manage sediment flowing downstream getting into the river 752 01:05:22,360 --> 01:05:25,320 getting into lake louisville etc 753 01:05:25,320 --> 01:05:34,840 they're not designed to mitigate impacts of development so they would require updates 754 01:05:34,840 --> 01:05:44,520 a good example to look at locally would be looking at the nrcs lakes in the city of mckinney 755 01:05:44,520 --> 01:05:51,000 they created requirements for development to upgrade those to provide more benefits 756 01:05:51,880 --> 01:05:53,160 and enhance water quality 757 01:05:53,160 --> 01:06:07,720 open up for questions commissioner brett thank you chair several of these strategies as well 758 01:06:07,720 --> 01:06:12,600 as the transfer development rights and that sort of thing to my mind presupposes that 759 01:06:13,880 --> 01:06:23,560 we have some method or rubric system point system to identify what areas specifically are high 760 01:06:23,560 --> 01:06:29,000 priority targets and which areas are not is that something that you see 761 01:06:29,000 --> 01:06:35,400 wrapped into the final plan and it would be incorporated within the given strategies or 762 01:06:35,400 --> 01:06:40,360 is that something that that we need to have more focus on the strategy really directs for further 763 01:06:41,400 --> 01:06:46,120 evaluation of all the natural systems so it would be like a stormwater master plan where 764 01:06:46,120 --> 01:06:49,640 you look at all the creeks and the pipes and everything and you determine where do we have 765 01:06:49,640 --> 01:06:54,760 issues where do we have flooding all that kind of thing this would be more it would be expanding 766 01:06:54,760 --> 01:06:59,640 on the esa is that you you currently have and it's taking a more detailed look so you could look at 767 01:06:59,640 --> 01:07:05,400 an area and you could say it let's say clear creek and there's you know erosion is natural 768 01:07:05,400 --> 01:07:10,280 erosion is happening there in their areas where there are trees that are probably at risk so you 769 01:07:10,280 --> 01:07:16,040 could evaluate that stream system on that property and determine you know what is the erosion 770 01:07:16,040 --> 01:07:21,400 potential of it erosion hazard potential many cities across the metroplex have done this 771 01:07:21,400 --> 01:07:28,120 fort worth for example they studied all their creeks citywide to determine what creeks are at 772 01:07:28,120 --> 01:07:36,360 risk for erosion so going beyond just the flood portion of it so it's really getting a detailed 773 01:07:36,360 --> 01:07:42,760 understanding of the health of all the systems within the northeast area okay and then prioritizing 774 01:07:42,760 --> 01:07:48,680 those so you envision that would be part of the implementation phase of yeah a plan like this 775 01:07:48,680 --> 01:07:56,440 yeah okay yeah and then secondly uh early this summer i think it was tim will hit me and remind 776 01:07:56,440 --> 01:08:03,160 me um i think there was a supreme court case about wetland areas that are not wet all the time 777 01:08:03,160 --> 01:08:14,040 and you can fill in the actual terms given that um do do we still have sufficient 778 01:08:14,040 --> 01:08:23,160 protective capability on those smaller tributaries uh within this area so that you referred to the 779 01:08:23,160 --> 01:08:28,680 waters of the u.s rule yes and that's something that's been in flux for the better part of a 780 01:08:28,680 --> 01:08:34,840 decade if not longer um and there's still going to be back and forth about what constitutes a 781 01:08:34,840 --> 01:08:41,880 high quality wetland is it connected to the main creek system is it not that probably isn't going 782 01:08:41,880 --> 01:08:45,880 to change at the federal level for quite some time it's going to be in the courts most likely 783 01:08:45,880 --> 01:08:53,000 already is actually but as part of the city of dentons development ordinance 784 01:08:54,200 --> 01:09:01,000 the stormwater management plan for the city and stormwater regulations those could be you know 785 01:09:01,000 --> 01:09:05,880 protected if they're identified you have to identify them first but then that would roll 786 01:09:05,880 --> 01:09:12,040 into you know if you have what's considered let's say a medium quality wetland on your property 787 01:09:12,040 --> 01:09:16,440 that you could potentially with the letter of the law the waters of the u.s you could 788 01:09:16,440 --> 01:09:23,080 potentially fill that in as a developer the city could provide some incentives to protect that 789 01:09:23,720 --> 01:09:27,000 and also require it as part of the development agreement okay thank you 790 01:09:27,000 --> 01:09:36,200 commissioner colt thank you chair uh michael right yes okay great um could you go back to the 791 01:09:36,200 --> 01:09:47,880 riparian buffer diagram please sir sorry i have a lot of slides to go through sorry about that 792 01:09:51,800 --> 01:09:55,000 there we go that's better much easier 793 01:09:55,000 --> 01:10:04,520 that one oh perfect thank you okay so it's clear creek that's clear creek 794 01:10:04,520 --> 01:10:14,280 so it looks like we have 1575 95 feet of buffer on each side of the creek correct 795 01:10:15,080 --> 01:10:22,200 that and this is free yeah but you can develop up to 90 feet away from that creek due to this diagram 796 01:10:22,200 --> 01:10:27,800 correct it's it's going to be based on one it's going to be based on floodplain first floodplain 797 01:10:27,800 --> 01:10:33,640 and floodway so in some cases the riparian buffer may extend out beyond what the floodplain is 798 01:10:33,640 --> 01:10:41,480 in most cases it's probably going to be within the floodplain okay and the idea is that you know 799 01:10:41,480 --> 01:10:47,800 that's providing you sufficient space we see the cowl on the right side there um just imagine that 800 01:10:47,800 --> 01:10:53,240 being a development that you've got an adequate buffer between that development and the creek 801 01:10:53,240 --> 01:10:58,840 system where you could also include your hike and bike trails or other public open spaces that are 802 01:10:58,840 --> 01:11:05,640 activated um another way to look at buffers is that there's absolutely no build allowed at all 803 01:11:06,840 --> 01:11:13,000 but that doesn't really provide any of the the opportunities to restore what may have already 804 01:11:13,000 --> 01:11:20,600 been impacted in the buffer i mean we all have our different hot buttons on this on these very this 805 01:11:20,600 --> 01:11:29,080 whole thing this is mine because i've spent a lot of time in clear creek fishing hunting camping 806 01:11:29,720 --> 01:11:36,680 and i can tell you it is an i-35 for wildlife okay yep and 90 feet 807 01:11:36,680 --> 01:11:48,040 that's not enough i i can promise you that and i i think that's part of that further evaluation 808 01:11:48,040 --> 01:11:55,320 of all the creek systems uh from from a kind of a detailed detailed hydraulic and hydrologic 809 01:11:55,320 --> 01:12:02,520 perspective which was not part of this um the 100 foot buffer and the 50 foot buffer 810 01:12:02,520 --> 01:12:09,400 that's what's been established as the esas right now so that certainly could be further evaluated 811 01:12:09,400 --> 01:12:16,680 i i with clear creek the floodplain is so wide and there's a lot of opportunities to bring back 812 01:12:16,680 --> 01:12:22,680 riparian vegetation within that floodplain so you you could end up having a larger buffer 813 01:12:22,680 --> 01:12:27,800 yeah i'm mostly worried about the impact of wildlife because there's such diverse wildlife 814 01:12:27,800 --> 01:12:34,360 down there i mean you know what's going to happen with otters you know if they're only 815 01:12:34,360 --> 01:12:42,120 it's just in in my mind it's not a big enough corridor for wildlife at all not even close 816 01:12:42,120 --> 01:12:50,280 and that's my concern um well i assume that picture is an example right that's an example 817 01:12:50,280 --> 01:12:55,560 it's not anything that's part of a plan or anything at this point yeah okay thank you all 818 01:12:55,560 --> 01:13:00,760 appreciate it and further clarification the current esa is that 100 foot and the 50 foot 819 01:13:00,760 --> 01:13:07,480 that's based on the amount of area draining to that particular point in the creek so as you get to 820 01:13:07,480 --> 01:13:12,280 larger drainage area you're obviously going to have wider floodplains so that buffer becomes 821 01:13:12,280 --> 01:13:19,080 larger uh and again right now that buffer is just essentially a no touch uh so this strategy that 822 01:13:19,080 --> 01:13:25,160 we talked about would kind of advance that a little bit and get a little more uh opportunity 823 01:13:25,160 --> 01:13:30,760 out of the buffer so you get the water quality benefits you maintaining that habitat connectivity 824 01:13:30,760 --> 01:13:32,920 i think is going to be super important as well 825 01:13:37,160 --> 01:13:53,240 anybody else okay thank you so we have two more strategies um we've got two historic 826 01:13:53,240 --> 01:13:59,400 preservation strategies the first is to conduct a historic resource survey and seek the historic 827 01:13:59,400 --> 01:14:07,000 designation of vital historic assets in the area so we heard from the people that there are a lot 828 01:14:07,000 --> 01:14:16,040 of historic assets here culturally historic assets but whatever it is right now there is no 829 01:14:16,040 --> 01:14:22,680 designation i will put in a plug for this uh strategy for the staff is you only have one 830 01:14:22,680 --> 01:14:29,080 historic preservation officer in this city and to do something like this and to have a historic 831 01:14:29,080 --> 01:14:38,120 designation program and manage your assets you will need more staff cameron cannot do this alone so 832 01:14:38,120 --> 01:14:46,520 just putting it out there for the budget time second strategy is to seek cultural landscape status 833 01:14:46,520 --> 01:14:56,600 for heartley airfield this is a different kind of designation heartley airfield seems to be 834 01:14:56,600 --> 01:15:01,640 uh really very well loved in the area thought of it's got historic 835 01:15:01,640 --> 01:15:12,760 even if it's not a building but it's got historic aspects to it that the people in the community 836 01:15:12,760 --> 01:15:20,120 really love and so the one way to preserve this would be to seek that cultural landscape status 837 01:15:20,120 --> 01:15:27,640 if you do there is some you can also get grants for it so one thing to keep in mind is that heartley 838 01:15:27,640 --> 01:15:34,520 field is on private property owned by private individuals so those funds might be used to 839 01:15:34,520 --> 01:15:41,080 incentivize to for them to seek this cultural landscape status but you would have to have the 840 01:15:41,080 --> 01:15:48,840 property owners consent to do anything on their property and so but that's something we should 841 01:15:48,840 --> 01:15:55,640 look for similar to you know do we want to go after development agreements in the etj so someone 842 01:15:55,640 --> 01:16:04,440 has to take uh take that step who would be the person or the entity to do it similar to that 843 01:16:04,440 --> 01:16:10,200 some entity has to take on negotiating with the property owner or giving them some incentives to 844 01:16:10,200 --> 01:16:17,160 go seek this cultural landscape status but that's one way to preserve this historic asset in the area 845 01:16:18,600 --> 01:16:27,960 so with that any other questions questions are on those last two strategies 846 01:16:27,960 --> 01:16:30,440 okay 847 01:16:30,440 --> 01:16:43,560 so direction and discussion um we are hoping to get some and i'll just make it this way 848 01:16:47,960 --> 01:16:56,840 so i can do it in real time you put sorry commissioner smith thank you uh you put that 849 01:16:56,840 --> 01:17:01,320 in like that's that's that's strategy one strategy two strategy you put them in order 850 01:17:01,320 --> 01:17:05,000 yes okay that's just i was about to say you're making this hard i mean i gotta go back and look 851 01:17:05,000 --> 01:17:08,520 at all the names of the strategies rather than just saying strategy one strategy two strategy three 852 01:17:12,200 --> 01:17:19,880 i uh the only i think the easier uh i don't chair i don't know how you want to do this i've got just 853 01:17:19,880 --> 01:17:24,040 like random stuff like strategy five okay let's not let's not do that that would be way too 854 01:17:24,040 --> 01:17:31,000 confusing so i assume you've got these in order yes yeah so i think what we need to do is go 855 01:17:31,000 --> 01:17:36,120 through them in order and we can get everybody's feedback if you have it if you don't have it that's 856 01:17:36,120 --> 01:17:41,080 fine too um and then we'll go from there if you can keep your notes in order that way does that work 857 01:17:41,080 --> 01:17:47,640 i guess like no comment does it keep well yeah or you can say keep yeah does that work shai does 858 01:17:47,640 --> 01:17:57,240 that work for you yes okay okay so strategy one is uh conservation development patterns uh to 859 01:17:57,240 --> 01:18:01,720 promote that for all future residential developments in the northeastern area 860 01:18:03,720 --> 01:18:10,920 commissioner puett thank you chair um so i think this is crucial um you know our our purview based 861 01:18:10,920 --> 01:18:23,960 on um staff's direction that you know council gave direction for for this basically amount of 862 01:18:23,960 --> 01:18:31,080 homes up here right the the biggest change to me is that we've got about a thousand acres 863 01:18:31,080 --> 01:18:37,720 that's re-identified as uh transition residential so that's about four thousand or sorry three 864 01:18:37,720 --> 01:18:44,840 thousand homes um and and so the the question then is how do you develop those in a manner that 865 01:18:44,840 --> 01:18:51,800 that achieves the other goals of this plan that are are very laudable um 866 01:18:51,800 --> 01:18:59,480 i'm very concerned about the 30 number that it was in the slide maybe it got taken out in a 867 01:19:00,200 --> 01:19:06,600 in an amendment i'm i didn't catch it as we were reading um i think that's far too low uh you know 868 01:19:06,600 --> 01:19:12,680 as as we saw pictures of the example um development colorado i guarantee you they 869 01:19:12,680 --> 01:19:19,960 were not at 30 percent they had to be probably 60 70 80 percent in order to get all the homes 870 01:19:19,960 --> 01:19:30,040 fronting a place like that um so so my direction is to modify this up way up and the only 871 01:19:30,040 --> 01:19:38,120 thing reason we started at 30 was to keep the density lower so the more you so base densities 872 01:19:38,120 --> 01:19:44,520 three units per acre right so the more you want open space the higher you have to give the density 873 01:19:44,520 --> 01:19:51,800 absolutely that's a trade-off i'll just say that all of all of the um examples of pds that we've 874 01:19:51,800 --> 01:20:00,760 seen come in that used the provision in our code to do this have used it to basically preserve areas 875 01:20:00,760 --> 01:20:05,720 that were already floodplain which i i understand that's that would be tweaked here so that it didn't 876 01:20:05,720 --> 01:20:13,800 apply um and and lot sizes went from 6000 square feet to 5600 square feet and it was still basically 877 01:20:13,800 --> 01:20:19,000 a subdivision and i don't think that's what anybody wants up there so i think that the 878 01:20:19,000 --> 01:20:22,600 percentage needs to be considerably higher than 30 in order to achieve something that's 879 01:20:22,600 --> 01:20:31,320 functionally unique so let me ask you this then but are you in agreement though with the strategy 880 01:20:31,320 --> 01:20:38,680 we just need to look at refining the the amount of land set aside for preservation yeah and i just 881 01:20:38,680 --> 01:20:47,160 think finding the right target and maybe a minimum is crucial to making sure that the implementation 882 01:20:47,160 --> 01:20:57,080 is as the pretty pictures will portend and we can also require not to have it like a typical 883 01:20:57,080 --> 01:21:02,920 subdivision we can put some design criteria in addition for that higher density 884 01:21:02,920 --> 01:21:11,720 okay anyone else on strategy one 885 01:21:14,520 --> 01:21:17,400 are we good to ask for that modification 886 01:21:17,400 --> 01:21:20,920 okay let's move on 887 01:21:20,920 --> 01:21:31,320 so second was to scale from higher density towards the freeways and 888 01:21:31,320 --> 01:21:34,920 going towards lower density to the center of the area 889 01:21:39,240 --> 01:21:48,280 yep uh third was to allow promote neighborhood level commercial development at specific 890 01:21:48,280 --> 01:21:55,880 nodes that um and to allow that within residential transition or as a transition between rural 891 01:21:55,880 --> 01:22:04,840 residential and okay yeah i think my only comment here as it relates to strategy three it also 892 01:22:04,840 --> 01:22:14,120 relates to um strategy 13 um the whole gateway north thing to me is i have a big question mark 893 01:22:14,120 --> 01:22:19,640 with that we have no idea what that looks like we don't even have an inner loop let alone to 894 01:22:19,640 --> 01:22:27,640 an outer loop i mean so designating that as this north gateway with this commercial i'm really 895 01:22:28,600 --> 01:22:35,160 just very apprehensive to do that at this point i just think it is an unknown and i know that 896 01:22:35,160 --> 01:22:42,040 this plan is going to need to be looked at again i mean if it does get done and it does 897 01:22:42,040 --> 01:22:45,800 get implemented i mean five years from now we're going to have to look at it again 898 01:22:45,800 --> 01:22:53,240 because things will have happened and we will need to tweak things and to me to to designate 899 01:22:53,240 --> 01:23:03,480 that north part as as it is presented um i just i would leave that honestly as a as a big question 900 01:23:03,480 --> 01:23:13,320 mark would you be okay if we said if outer loop at this level oh tina's gonna answer that well 901 01:23:13,320 --> 01:23:18,040 i was just saying i mean to that point you're right um this is something that we're gonna have 902 01:23:18,040 --> 01:23:22,600 to monitor and update with the comprehensive plan so you know we're we're trying to 903 01:23:23,240 --> 01:23:28,040 plan for growth and development based upon the known factors that we have today we're working 904 01:23:28,040 --> 01:23:34,040 diligently with textile on the outer loop um you know it may be 20 years out when that thing is 905 01:23:34,040 --> 01:23:39,000 built but we know we're planning for it and so we're trying to be smart in our land planning 906 01:23:39,000 --> 01:23:44,440 if that project for whatever reason goes away then we would be revisiting the land use designations 907 01:23:44,440 --> 01:23:49,000 that are out in this area so you know just shy's point into your point this will be something that 908 01:23:49,000 --> 01:23:54,200 we'll have to monitor and we'll have to update our comprehensive plan every five to ten years to make 909 01:23:54,200 --> 01:24:00,280 sure everything within the plan is still relevant true but that's why i don't want to designate it 910 01:24:00,280 --> 01:24:06,760 now the way it is in this plan because it's going to be way harder to go backwards so if we if we 911 01:24:06,760 --> 01:24:11,800 say hey this northern area we've got it we've got this section set up for this commercial development 912 01:24:11,800 --> 01:24:16,680 whether the outer loop happens or i don't know if it's going to happen but i know that if it's 913 01:24:16,680 --> 01:24:22,360 designated on this plan this plan is going to keep getting referred to just like our comprehensive 914 01:24:22,360 --> 01:24:27,640 plan gets referred to and it's going to say well this area they all looked at this back in 2023 915 01:24:27,640 --> 01:24:33,320 and they said this area is supposed to be commercial so it's just harder to go backwards 916 01:24:33,320 --> 01:24:37,160 and suddenly say well it shouldn't be developed as commercial it should be 917 01:24:39,000 --> 01:24:46,520 conserved so that's why i think it needs to be left out honestly because you know and not i 918 01:24:46,520 --> 01:24:51,480 understand what you're saying but it's it's it's the area that we're dealing with right now 919 01:24:51,480 --> 01:24:59,080 and and yes planning is is is a great idea and if we were inside the loop and and we had this 920 01:24:59,080 --> 01:25:05,000 piece that was undeveloped we know that's coming it's such a question mark up there and it's it 921 01:25:06,760 --> 01:25:10,440 i i don't even know how many of us will be on this planet when that actually happens 922 01:25:10,440 --> 01:25:15,320 i mean we can't again we can't even get the loop finished and i lived here for 30 years 923 01:25:15,320 --> 01:25:22,600 well and keep in mind so this is on the scenario two plan that council gave us direction to move 924 01:25:22,600 --> 01:25:30,840 forward with so the the land use designation has our we've already been given that direction so 925 01:25:30,840 --> 01:25:37,400 then we're looking at okay do these strategies make sense for implementing the plan so like this 926 01:25:37,400 --> 01:25:43,480 strategy number three if you recall was back more towards the discussion on the rural village concept 927 01:25:43,480 --> 01:25:49,880 and being able to apply that also within residential transition area in locations 928 01:25:49,880 --> 01:25:55,400 where it's appropriate to do so so i understand your concern and where you're coming from but 929 01:25:56,440 --> 01:26:02,120 that part of this project is not debatable i would say at this time because of the direction that 930 01:26:02,120 --> 01:26:06,600 council had given us that that's on the the scenario i'm not debating the strategy i'm 931 01:26:06,600 --> 01:26:15,000 debating that particular designation in this part of the the area period i'm not so no i don't think 932 01:26:15,000 --> 01:26:19,880 it goes against council at all i think that and and they can they're obviously in the end going to do 933 01:26:19,880 --> 01:26:26,360 what it is i'm giving my opinion as i see it in looking at what is presented in front of us today 934 01:26:26,600 --> 01:26:33,880 um and i'm sorry i just i didn't mean to cut you but i actually have a solution to it the one 935 01:26:33,880 --> 01:26:41,480 thing i will say is um we had the same issue in burleson uh many years ago when 121 was coming 936 01:26:41,480 --> 01:26:47,640 through we did not want and we had the same conversation didn't want to designate it before 937 01:26:47,640 --> 01:26:55,320 it came well right before it came people put in these really bad looking um storage unit kind of 938 01:26:55,320 --> 01:27:02,600 things it was in the etj was uh some was in the city limits but then the etj built the storage 939 01:27:02,600 --> 01:27:09,000 unit so the pnz and council could say nothing to the gentleman right next door and then came the 940 01:27:09,000 --> 01:27:16,920 fancy looking 121 and today you will see the gateway into burleson off of 121 is this really 941 01:27:16,920 --> 01:27:25,400 bad looking outdoors those storage climate control storage unit places but i understand your issue too 942 01:27:25,400 --> 01:27:34,600 one thing we can do in the plan is to say until the loop is set this will be as is preservation 943 01:27:34,600 --> 01:27:42,840 area and if that outer loop is uh whenever the outer loop alignment is set this is what it will 944 01:27:42,840 --> 01:27:48,840 be when the alignment happens and that way we're covered if it doesn't happen for 20 years nothing 945 01:27:48,840 --> 01:27:55,640 needs to change if it does come people know what they can build there you know another thing we 946 01:27:55,640 --> 01:28:01,400 can also add as a strategy is something with respect of trying to minimize leapfrog development 947 01:28:01,400 --> 01:28:07,560 because in in all reality there are other issues that are going to come into play such as availability 948 01:28:07,560 --> 01:28:13,880 of utilities to be able to serve that area in in that that's going to be the greater cause i mean 949 01:28:13,880 --> 01:28:18,840 we we've had conversations with property owners between the loop and out there and you know they're 950 01:28:18,840 --> 01:28:24,920 looking for financial support from the city we had a property much farther north large track that 951 01:28:24,920 --> 01:28:30,440 was looking for a potential pit or a tiff district in that area and the city was not interested in 952 01:28:30,440 --> 01:28:34,040 supporting that so this i think there are other things that are going to be able to control your 953 01:28:34,040 --> 01:28:40,920 concern i like shy suggestion that until the outer loop is more reaffirmed that this area would 954 01:28:40,920 --> 01:28:45,160 continue in a preservation status let me get other this is just my opinion anyway let me just get 955 01:28:45,160 --> 01:28:50,200 other commissioners involved in this commissioner cole thank you chair um i think the it's more 956 01:28:50,200 --> 01:28:55,560 imminent than we think because collin county's already complete finished segments of the outer 957 01:28:55,560 --> 01:29:06,840 loop already so i think it's closer than you know is is it's imminent and when you have that much 958 01:29:06,840 --> 01:29:11,560 of it done in collin county it's just a matter of time i don't think it's that far off 959 01:29:11,560 --> 01:29:19,240 because i do know they're negotiating right now with landowners on the west side of town 960 01:29:20,120 --> 01:29:27,000 for the loop so it's it's more imminent and i think is being portrayed right and i might add 961 01:29:27,000 --> 01:29:34,520 that the mpo also has funding associated for the outer loop and dentin so and you were mentioning 962 01:29:34,520 --> 01:29:40,360 428 there's no funding associated 428 improvements for relative this glad to know 963 01:29:40,360 --> 01:29:49,080 commissioner smith i'll be quick i'd rather have a vision for we want to see there than not have 964 01:29:49,080 --> 01:29:53,480 a vision for it at all i like the idea of designating as conservation till a certain 965 01:29:53,480 --> 01:29:58,440 point in time i even have the idea of saying it's going to be this vision and for the next 966 01:29:58,440 --> 01:30:02,360 certain amount of years until this happens i'm cool with that for that modification i think that 967 01:30:02,360 --> 01:30:07,560 that your modification recommendation makes sense we shouldn't just 100 lock down something but i 968 01:30:07,560 --> 01:30:13,720 think having no vision for the area for that specific area is more dangerous than than not 969 01:30:13,720 --> 01:30:19,800 having it so um or then having it yeah i think i would be okay with it if it was attached to 970 01:30:19,800 --> 01:30:28,600 actual road development out there uh and not have it be part of it not connected so not attached to 971 01:30:28,600 --> 01:30:33,960 that because again then we develop something out there and we just we we're just kind of we're 972 01:30:33,960 --> 01:30:40,760 doing this and that's not what to me that's not what this should be okay anybody else commission 973 01:30:40,760 --> 01:30:47,880 for it thank you yeah i'll just say i'm no fan of text dot planning our land use for us 974 01:30:47,880 --> 01:30:55,960 and that's what it looks like um you know at the same time i i'm pessimistic maybe five percent 975 01:30:55,960 --> 01:31:02,280 chance that if we say it's going to be conserved and then we want it to be this vision that that 976 01:31:02,280 --> 01:31:11,800 would actually happen um but by setting something forward there's a five percent chance instead of 977 01:31:11,800 --> 01:31:20,520 a zero percent chance so i'm okay with it commissioner smith do you want to run through 978 01:31:20,520 --> 01:31:30,280 all your thoughts um no um yeah i think anything else here i have um i can email okay yeah i think 979 01:31:30,280 --> 01:31:39,080 we'll be okay um okay so we are on so that's two are we good anybody else i'm sorry three yes 980 01:31:39,080 --> 01:31:48,440 yes so do we add that little yes that modification yeah okay i got so we are on 981 01:31:48,440 --> 01:31:58,280 uh number four create design standards to enhance uh for future developments uh to enhance rural 982 01:31:58,280 --> 01:32:07,720 character of the area add design standards in northeast and specific to the area okay yes 983 01:32:07,720 --> 01:32:15,720 and then development agreements number five i'd like to i'd like to see if we can make a 984 01:32:15,720 --> 01:32:21,560 modification just to have some sort of notification to landowners on development agreements um in that 985 01:32:21,560 --> 01:32:27,000 plan having something that's included within there that says in this strategy um maybe notifying land 986 01:32:27,000 --> 01:32:31,880 owners and letting them know hey this is in the plan's been approved it's been done if you are 987 01:32:31,880 --> 01:32:35,800 wanting to do a development agreement this is what development agreement is this is how you should 988 01:32:35,800 --> 01:32:40,840 start that conversation uh really a better way to hear my recommendation for a modification is to 989 01:32:40,840 --> 01:32:49,080 include a marketing plan so in the action steps for this will include uh send out a notification 990 01:32:49,080 --> 01:32:58,280 to invite property owners cool that's all i got commissioner hole i want to follow up 991 01:32:58,280 --> 01:33:03,320 with commissioner smith i i agree totally with that and i'd like to see it i retract my statement 992 01:33:03,320 --> 01:33:12,360 okay we're good okay let's go to six 993 01:33:16,680 --> 01:33:19,240 sorry 994 01:33:19,240 --> 01:33:28,680 infrastructure complete streets and uh context-sensitive design for streets 995 01:33:28,680 --> 01:33:37,400 so multimodal street design so to basically to change your thoroughfare plan to have 996 01:33:37,400 --> 01:33:45,480 different cross-sections so six and seven are actually one uh strategy saying yes to six and 997 01:33:45,480 --> 01:33:53,160 no to seven won't work right we have to say yes to both yeah commissioner perot yeah i'll just say 998 01:33:53,160 --> 01:34:01,320 in sorry i'm eight keep going okay we're good with six and seven okay 999 01:34:01,320 --> 01:34:05,320 well let's let's go to eight 1000 01:34:05,320 --> 01:34:11,800 eight was that's the trails yeah trails 1001 01:34:16,360 --> 01:34:20,200 wait strategy eight is develop a network trail that connects residential commercial 1002 01:34:20,200 --> 01:34:22,760 open spaces form an active transportation network 1003 01:34:22,760 --> 01:34:31,160 everybody everyone's good anything on that okay and then nine dcta yeah 1004 01:34:31,160 --> 01:34:42,040 yeah okay do we want to put it as long-term uh goal 1005 01:34:42,680 --> 01:34:50,200 in the action plan i i sorry go ahead commissioner go ahead i completely trust staff on how to 1006 01:34:50,200 --> 01:34:56,120 prioritize these things i just don't want people to get bogged down in action items 1007 01:34:56,120 --> 01:35:02,760 and that keep us from doing what staff knows is highest priority for the whole city from a transit 1008 01:35:02,760 --> 01:35:09,320 perspective so i'm okay with it yeah i mean i agree strategy nine to me it's certainly low priority 1009 01:35:09,320 --> 01:35:16,120 in this plan um i think i mean we we have we need so much more improvement within this 1010 01:35:16,120 --> 01:35:23,720 the loop of the city with when it comes to dcta that i don't i don't even see this happening in 1011 01:35:23,720 --> 01:35:31,480 any kind of near future so it just seems very very low priority and and we usually try to put it 1012 01:35:31,480 --> 01:35:37,160 because it's a 20-year plan just in case suddenly somebody has money and something happens then we 1013 01:35:37,160 --> 01:35:43,720 want to be able to grab it and say it was in the plan yeah sure and then this one is the mobility 1014 01:35:43,720 --> 01:35:49,160 plan the thoroughfare plan where we recommended different roadways the connectivity if you all 1015 01:35:49,160 --> 01:35:55,400 remember we will be putting in there again that it will go with the development and not 1016 01:35:58,040 --> 01:36:09,320 be built thank you chairs so my brief comment on this nine and ten i think um i understand and i 1017 01:36:09,320 --> 01:36:16,920 support both of them i get really scared when i see a four lane divided highway in the slides 1018 01:36:16,920 --> 01:36:24,200 i would just ask that as we go through the implementation of this we take a hard look at 1019 01:36:25,080 --> 01:36:35,080 you know it's a rural area if it's 600 cars per day we don't need a four lane road so and 1020 01:36:35,080 --> 01:36:39,640 we monitor that as part of our development projects right and we recognize that roads are 1021 01:36:39,640 --> 01:36:47,000 maybe in an interim state until they are in their full built-out condition i mean we do that today 1022 01:36:47,000 --> 01:36:56,920 as we're working on projects yeah so i mean i yeah enough said okay 1023 01:36:56,920 --> 01:37:10,440 okay we are on uh 12 i think i'm sorry 11 right yes 11 11 economic development 1024 01:37:11,240 --> 01:37:17,880 for small business unique that's a good strategy to keep for sure everyone 1025 01:37:17,880 --> 01:37:27,320 next is uh the open space conservation and management transfer of development rights 1026 01:37:27,320 --> 01:37:35,240 commissioner smith i'm a big hard no on this one as of right now um i just and i know this 1027 01:37:35,240 --> 01:37:43,000 is a 30 000 foot level view plan and this is a 30 000 foot level idea um maybe i shouldn't call it 1028 01:37:43,000 --> 01:37:49,800 an absolute remove but i i don't know how to modify it i don't know how to make a recommendation for 1029 01:37:49,800 --> 01:37:55,160 a modification i feel like it's the biggest issue for me is not about the idea of being able to 1030 01:37:55,160 --> 01:38:00,920 exchange units in exchange for density and conservation and encourage conservation through 1031 01:38:00,920 --> 01:38:06,040 economic development and i'm not a curmudgeon for a change i understand other states and other areas 1032 01:38:06,040 --> 01:38:10,920 probably do this and it's probably a well-developed plan elsewhere somewhere in the country it just 1033 01:38:10,920 --> 01:38:21,160 feels to me like there is too much risk to allowing flexibility in density on zoning which i think city 1034 01:38:21,160 --> 01:38:26,120 staff knows i'm a big huge proponent for flexibility and development code and flexibility in a lot of 1035 01:38:26,120 --> 01:38:33,560 areas but if it's approved as a base zoning of zone four of r4 but because of this unit plan idea 1036 01:38:33,560 --> 01:38:39,080 we can exchange it in somehow some way neighborhood looks up and it's really a density of you know not 1037 01:38:39,080 --> 01:38:44,680 even r7 it's a density of five or six it's like how did that happen oh this really complicated 1038 01:38:44,680 --> 01:38:49,560 indexing method that we used for exchange of conservation land for a piece of property you 1039 01:38:49,560 --> 01:38:54,760 can't see that's three miles behind us that you don't understand oh but i know how that happened 1040 01:38:54,760 --> 01:38:59,720 it seems too too complicated there's probably a simpler more clearly defined way in which we can 1041 01:38:59,720 --> 01:39:05,080 encourage conservation through economic development but i don't think this this is it yeah and i'm 1042 01:39:05,080 --> 01:39:11,480 gonna piggyback on that i'm a hard no on that too because i think it could absolutely invite 1043 01:39:11,480 --> 01:39:18,440 density to where it's unwanted i mean it's like it's supposed to be this but oh well with this 1044 01:39:18,440 --> 01:39:25,320 little transfer of stuff and oh now suddenly this one development is way bigger than anyone 1045 01:39:25,320 --> 01:39:35,800 anticipated and and it's from how i understand it and see it right now i see no reason for it 1046 01:39:35,800 --> 01:39:44,600 to be here other than to play games and shenanigans with with density that is zoned a certain way and 1047 01:39:44,600 --> 01:39:51,400 it's gonna be something else commissioner i'm gonna know on that as well yeah if if maybe it 1048 01:39:51,400 --> 01:39:59,160 could be brought forward to where it can be to where are the fears are are are not there but i 1049 01:39:59,160 --> 01:40:05,240 i don't i don't see it as being or to make it positive i mean as it's as it's currently sorry 1050 01:40:05,240 --> 01:40:12,360 as it's currently lined out it's it is general so i guess i i i get that because as programs and 1051 01:40:12,360 --> 01:40:16,040 policies can be created off our landlords have said not develop their property in return checked 1052 01:40:16,040 --> 01:40:23,720 up in spaces so it is vague um but it it once again i think there's maybe just a different way 1053 01:40:23,720 --> 01:40:29,560 in which that can be that can be reworded and re-revisioned to where it it isn't it is something 1054 01:40:29,560 --> 01:40:37,800 totally different than strategy 11 or totally different than even strategy 13 which both are 1055 01:40:38,360 --> 01:40:46,120 trying to address the same piece but this opens up some sort of as a result selling landowners can 1056 01:40:46,120 --> 01:40:50,040 generate income and keep partial parcels of land intact to possibly reduce the property tax without 1057 01:40:50,040 --> 01:40:54,120 developing their property it just it seems like it's this money-making strategy it's inside of 1058 01:40:54,120 --> 01:40:58,760 there that i don't think it's a shell game that needs to be included in the plan agreed are you 1059 01:40:58,760 --> 01:41:06,440 sorry i was gonna ask are you all uh only against if the density selling area and the buying area 1060 01:41:06,440 --> 01:41:12,360 was in northeast or are you okay with a northeast being the selling area and somewhere else in the 1061 01:41:12,360 --> 01:41:20,520 city being the buying area the thing is we want to make sure the property owners in northeast 1062 01:41:20,520 --> 01:41:27,640 can actually not say you're taking their property by not letting them develop they can at least use 1063 01:41:27,640 --> 01:41:32,440 their property make money off of their property but not develop their property that's the idea 1064 01:41:33,160 --> 01:41:37,480 yeah i understand the idea and i think i think part of that is there's a there's a there's a 1065 01:41:37,480 --> 01:41:42,600 certain flexibility that results in a finality that i don't agree with either that hey with 1066 01:41:42,600 --> 01:41:46,680 flexibility for current landowner to not develop this and turn it into a conservation easement 1067 01:41:46,680 --> 01:41:53,320 okay that's cool for now and it's cool for the next 20 years but those conservation easements are 1068 01:41:53,320 --> 01:41:58,600 forever they're for forever and i can remember if they were 100 they're 100 years or they're 1069 01:41:58,600 --> 01:42:03,480 perpetual it's like forever they're perpetual then i mean we are we're taking a flexibility for an 1070 01:42:03,480 --> 01:42:08,840 idea being thrown around now that locks it up for forever yeah and i'm not saying that we want to 1071 01:42:08,840 --> 01:42:15,240 turn that area into concrete city but i also don't want to speak for dentin 100 years from now 1072 01:42:15,240 --> 01:42:21,080 and who knows what's going to be needed at that time it just it's it's flexibility leading to 1073 01:42:21,080 --> 01:42:26,280 finality that scares me within that well and i think and that's fine and this is why we wanted 1074 01:42:26,280 --> 01:42:32,600 your feedback so i mean if the if the consensus of the group is to exclude especially the transfer 1075 01:42:32,600 --> 01:42:41,000 development rights and in the buying and selling we can still work towards trying to create policies 1076 01:42:41,000 --> 01:42:47,560 that incur the open space conservation and management i was looking back to our strategies 1077 01:42:47,560 --> 01:42:52,440 under the land development management so i think we can we can work to refine those other strategies 1078 01:42:52,440 --> 01:42:59,560 under the the land development but um but not invest time and effort on this transfer development 1079 01:42:59,560 --> 01:43:05,000 rights and buying and selling because it is complex right and and to your point um it 1080 01:43:05,000 --> 01:43:12,040 if if we're struggling with it here and and how we might navigate through it then i can understand 1081 01:43:12,040 --> 01:43:16,520 members of the public may also um to your point and concern so that that's okay and that's why 1082 01:43:16,520 --> 01:43:20,120 we want to have this conversation is to find out where your concerns lie so i'm gonna invite 1083 01:43:20,120 --> 01:43:23,800 commissioner pruett in because i know he's got a differing opinion i think thank you chair 1084 01:43:23,800 --> 01:43:33,400 you know i i'm just trying to imagine the future here um and i want to make sure we're not throwing 1085 01:43:33,400 --> 01:43:38,040 the baby out with the bath water to to borrow an analogy that's probably not quite right um 1086 01:43:38,040 --> 01:43:47,800 the part of me that loves simplicity and clarity is is 100 aligned with the three of you however 1087 01:43:49,720 --> 01:43:57,160 this is not a simple area the thing i worry about without some sort of tool like this maybe there 1088 01:43:57,160 --> 01:44:05,480 are other options that would be more amenable um is that then you see the type of piecemeal 1089 01:44:05,480 --> 01:44:11,560 development that we've seen in other areas of the city just because so and so did wanted to develop 1090 01:44:11,560 --> 01:44:19,080 their property and a different person did not um and and by not having some sort of tool like this 1091 01:44:19,080 --> 01:44:27,160 i worry that the the in in the presentation we were talking about prioritization and and 1092 01:44:27,160 --> 01:44:35,400 metrics of areas that we want to be preserved i could just see how easily this ends up being 1093 01:44:35,400 --> 01:44:40,600 a an area where we preserve places by accident just because of where the borders are drawn 1094 01:44:40,600 --> 01:44:46,360 between different landowners as opposed to preserving areas that are valuable to preserve 1095 01:44:46,920 --> 01:44:53,400 so i don't know if there's a different tool or not but there's got to be something that gets us 1096 01:44:53,400 --> 01:45:02,440 away from the lines on the platting map and toward the areas for ecological and and historical and 1097 01:45:02,440 --> 01:45:09,080 all the other reasons that the whole rest of the draft talks about says here's the areas we want 1098 01:45:09,080 --> 01:45:17,320 to focus and if you don't have a transfer flexible piece then there's no way to kind of you know 1099 01:45:17,320 --> 01:45:27,160 manage that preservation on a different owner's piece of land right yeah understood and yeah point 1100 01:45:27,160 --> 01:45:31,800 well taken i just i wonder if there's a different way to incentivize conservation versus 1101 01:45:33,560 --> 01:45:41,080 a slippery slope of possibly especially in the same area of of getting just way higher density 1102 01:45:41,080 --> 01:45:45,960 by doing this and it's this kind of smoke and mirrors kind of thing that just doesn't feel right 1103 01:45:45,960 --> 01:45:50,680 so i will say that during the presentation we heard that most of the time when something like 1104 01:45:50,680 --> 01:45:59,960 this is codified it's codified by a base uh you know um development right of of a gross density 1105 01:45:59,960 --> 01:46:05,480 with a cap of here's how much you can get above that through this mechanism so it's not 1106 01:46:05,480 --> 01:46:14,280 all bars loose we have an opportunity sorry yeah yes just to the point that what was heard very 1107 01:46:14,280 --> 01:46:19,880 clearly for me is the majority doesn't want this to be included to answer your specific question 1108 01:46:19,880 --> 01:46:25,400 that yes there are other tools and vehicles that we can achieve the same thing and it doesn't mean 1109 01:46:25,400 --> 01:46:31,640 that um it's dead because we kill it right here right now but the detail isn't there so for us 1110 01:46:31,640 --> 01:46:36,600 just to to take that and say okay we're going to remove this doesn't mean that it doesn't come back 1111 01:46:36,600 --> 01:46:42,920 in some other form or fashion when we can distill a little better so okay thank you commissioner 1112 01:46:42,920 --> 01:46:48,840 mcdave thank you chair yeah i was gonna say i'm also a no on this for the simple fact that it is 1113 01:46:48,840 --> 01:46:57,160 complicated but to uh piggyback on what tina said somewhere in the future if you get the wording 1114 01:46:57,160 --> 01:47:03,960 so it's not only understandable by the the property owner but by joe public 1115 01:47:03,960 --> 01:47:10,520 because if this happens and they go okay we have no idea you know explain it to us you want to make 1116 01:47:10,520 --> 01:47:16,760 everyone not just the property owners and and the buyer you want to make the whole city aware of how 1117 01:47:16,760 --> 01:47:23,400 this how this works instead of just leaving it to the property owners too so that's why right now 1118 01:47:23,400 --> 01:47:29,080 in a few years you know you reword it and make it easier to understand because that was a very 1119 01:47:29,080 --> 01:47:37,480 complicated uh strategy there so at the right now i i'm a no on this one and you do have to study it 1120 01:47:37,480 --> 01:47:43,400 in detail because somebody in the city is going to be upset even if you say oh we're going to put 1121 01:47:43,400 --> 01:47:50,280 apartments or higher density a long loop 288 the people that have homes backing up to 288 are not 1122 01:47:50,280 --> 01:47:56,280 going to like it so you have to really study where and how much density you're going to put it nobody 1123 01:47:56,280 --> 01:48:04,040 is going to be happy with it so you're right somebody's going to be upset that's my life 1124 01:48:04,040 --> 01:48:12,200 shall we go so we'll remove this transfer of development rights there were some other things 1125 01:48:12,200 --> 01:48:20,120 like conservation district will keep and then um incentives to ensure design standards are met by 1126 01:48:20,120 --> 01:48:30,200 character area is that something we are good with and then how about recruiting those uh 1127 01:48:30,840 --> 01:48:43,320 nomadic workforce do we want to do that now commissioner cole okay yeah okay oh 1128 01:48:43,320 --> 01:48:51,320 and i think i'm gonna pause you right there um and i know we've got a few more strategies that 1129 01:48:51,320 --> 01:48:58,360 that took us through 14 i think yes yep so i'm gonna pause i'm going to uh due to a prior 1130 01:48:58,360 --> 01:49:03,160 commitment i have to buy out about out of the meeting commissioner vice chair smith is going 1131 01:49:03,160 --> 01:49:12,680 to take over and run the meeting so we will um adjourn at 557 p.m and do you all want to 1132 01:49:12,680 --> 01:49:19,320 come right back or maybe get your food or whatever you decide do we have food there is oh okay yeah 1133 01:49:19,320 --> 01:49:22,840 why don't you all get your food and then you can reset yeah that works okay five minutes let's 1134 01:49:22,840 --> 01:49:34,200 adjourn at 558 p.m thank you very much for the recess and welcome back to the planning and zoning 1135 01:49:34,200 --> 01:49:39,960 special call work session i will re-convene our meeting at 605 and continue with presentation 1136 01:49:39,960 --> 01:49:48,600 from our consultant shy we are on strategy 15 good evening everyone again um starting strategy 1137 01:49:48,600 --> 01:49:56,200 15 environmental preservation so adopt regulations that provide for appropriate vegetative riparian 1138 01:49:56,200 --> 01:50:03,400 buffers along all major streams and tributaries i just want to point we said along all michael had 1139 01:50:03,400 --> 01:50:09,960 mentioned that every one of them does not have a floodplain studied floodplain but we're recommending 1140 01:50:09,960 --> 01:50:12,680 we do vegetative buffers along all 1141 01:50:16,040 --> 01:50:19,240 all right looks like we're all good to keep it 1142 01:50:19,240 --> 01:50:27,640 uh strategy 16 uh creating an active uh bike and pedestrian transportation corridors 1143 01:50:27,640 --> 01:50:32,680 within the riparian buffers right now nothing's allowed in it correct 1144 01:50:36,600 --> 01:50:46,200 commissioner prudit sorry i on the previous one um given the direction of the city in a city-wide 1145 01:50:46,200 --> 01:50:51,080 perspective and the discussion that we had earlier about habitats and that sort of thing maybe we 1146 01:50:51,080 --> 01:51:00,360 want to modify that to include um habitat widths based on the the local area in addition to just 1147 01:51:00,360 --> 01:51:05,800 the riparian distances for the flora and fauna or for the fauna in addition to the flora does 1148 01:51:05,800 --> 01:51:10,840 that make sense well and i was going to ask would that be more of an action item in support of this 1149 01:51:10,840 --> 01:51:16,040 strategy shy or would that be something that would be appropriate to include in the wording of this 1150 01:51:16,040 --> 01:51:23,560 strategy or michael do you mean like a like a new strategy in addition no i was talking about so um 1151 01:51:23,560 --> 01:51:29,400 the these strategies that have been identified they will have supporting action items to implement 1152 01:51:29,400 --> 01:51:34,840 the strategy so um so that's why i was asking i didn't know if that would be what your suggestion 1153 01:51:34,840 --> 01:51:38,680 especially taking into consideration the widths of these riparian buffers and depending upon the 1154 01:51:38,680 --> 01:51:45,880 condition of each of the creeks or streams um an action item would be to um you know study those 1155 01:51:45,880 --> 01:51:51,080 streams and evaluate the appropriate riparian buffer widths so that the action item becomes 1156 01:51:51,080 --> 01:51:56,600 more specific to support the strategy so that's the only reason why i was asking so because um 1157 01:51:56,600 --> 01:52:03,640 because if you get too specified on the strategy then that might inadvertently rule out some other 1158 01:52:03,640 --> 01:52:08,440 action items that could support that so that that's the only reason why i ask yeah definitely an 1159 01:52:08,440 --> 01:52:13,160 action item and it would expand to look at the habitat and the connectivity too so this would be 1160 01:52:13,160 --> 01:52:18,360 something that would be explored in detail with let's say an ecologist or environmental engineer 1161 01:52:18,360 --> 01:52:23,880 combined does that address your question yeah and commissioner cole are you okay with that okay 1162 01:52:23,880 --> 01:52:31,480 all right so we'll leave that strategy as worded then number 15 got it back to 16 um i think we 1163 01:52:31,480 --> 01:52:38,440 set set general consensus of a yes on this uh only thing i'd add in as an action item on this would 1164 01:52:38,440 --> 01:52:45,560 be uh to add in a sub trail master plan or a subsection to the trail master plan within there 1165 01:52:45,560 --> 01:52:49,800 that if we're adding those adding in it sounds like the way that strategy is worded is is to 1166 01:52:49,800 --> 01:52:56,920 create code for allow for pedestrian walkway and you know usage in riparian buffers i think 1167 01:52:56,920 --> 01:53:02,360 as an action item in that and that's and that 16 would be to then add that into our our master 1168 01:53:02,360 --> 01:53:12,920 plan our trails master plan we have for parks okay okay anything else is 16 good to go 1169 01:53:12,920 --> 01:53:20,680 okay 17 prioritized shared use and multi-benefit nature-based infrastructure including 1170 01:53:20,680 --> 01:53:27,560 best management practices such as bioswales bioretention enhanced swales um and the action 1171 01:53:27,560 --> 01:53:36,680 item would be which of the uh mass uh design criteria manuals you might need to change in the 1172 01:53:36,680 --> 01:53:44,200 city to add that in but the strategy is to prioritize that okay we're good looks like 1173 01:53:44,200 --> 01:53:50,520 we're a general consensus of yes that's good and then uh prioritize the protection restoration 1174 01:53:50,520 --> 01:53:57,240 expansion of the tall grass prairie and connected woodland spaces in the area okay everyone's good 1175 01:53:57,240 --> 01:54:08,120 there uh evaluate the efficacy of retrofitting existing stock bonds um to create i'm just going 1176 01:54:08,120 --> 01:54:16,600 to paraphrase it to create a overall stormwater quantity and quality mitigation system yep looks 1177 01:54:16,600 --> 01:54:26,280 good so one of the action items of this would be to look at a area wide uh stormwater management 1178 01:54:26,280 --> 01:54:34,440 plan and then two more historic preservation um strategies that's to conduct a historic resource 1179 01:54:34,440 --> 01:54:40,840 survey and seek historic designation of vital assets in the area is that a study everyone 1180 01:54:40,840 --> 01:54:47,560 i think we're on board for that oh commissioner prudit thank you chair i'm not against this but 1181 01:54:47,560 --> 01:54:56,520 i'm very sensitive to our capacity as a city to actually implement this plan um given the the 1182 01:54:56,520 --> 01:55:04,200 comments of the the staff needs and that sort of thing i would just ask that the action items be 1183 01:55:04,840 --> 01:55:14,680 drafted in a manner that gives us clear you know low effort high return items um 1184 01:55:14,680 --> 01:55:23,800 so that we make sure we with our limited capacity we make the most progress in this as possible 1185 01:55:23,800 --> 01:55:28,040 well and if i could add to that um and i didn't weigh on the comment previously but 1186 01:55:28,040 --> 01:55:34,600 you know that we have other resources that we may be able to utilize to accomplish this 1187 01:55:34,600 --> 01:55:42,040 so while i know shy put a plug for additional staff on my historic preservation team know that 1188 01:55:42,040 --> 01:55:46,520 we could potentially have resources available to utilize consultant services with to help us with 1189 01:55:46,520 --> 01:55:51,160 historic resource surveys we've done that in the past so that's not something that is foreign to us 1190 01:55:51,160 --> 01:55:58,040 that gives us that additional manpower to be able to be able to accomplish that objective so i think 1191 01:55:58,040 --> 01:56:05,160 the i think the strategy is important to keep um but we can focus on what the necessary action 1192 01:56:05,160 --> 01:56:17,960 items are to support that okay good we'll give more detail on in during the action items and then 1193 01:56:17,960 --> 01:56:24,120 seek cultural landscape status for hurtly field yeah i think we're all good there 1194 01:56:27,000 --> 01:56:32,920 thank you all so much we are thank you shy uh then uh next steps uh city staff you guys can give us 1195 01:56:32,920 --> 01:56:38,280 the next steps everyone who's watching at home uh what where we go from here right so when we 1196 01:56:38,280 --> 01:56:43,000 put these materials together we were anticipating that these strategies would also we would have a 1197 01:56:43,000 --> 01:56:51,080 discussion with council on the 14th um we've retooled our um task on that so we will not be 1198 01:56:51,080 --> 01:56:55,560 having that discussion with council on the 14th that's a decision that's been made by our director 1199 01:56:56,360 --> 01:56:59,960 instead council is going to be able to take all the feedback that we receive from the commission 1200 01:56:59,960 --> 01:57:03,720 and that's why we really wanted to focus and have this conversation with the commission because 1201 01:57:03,720 --> 01:57:08,680 to more the emphasis on the planning part of your planning and zoning commission title right 1202 01:57:08,680 --> 01:57:14,200 so i appreciate all your feedback and comments on that so we're going to be retooling our project 1203 01:57:14,200 --> 01:57:20,280 schedule we will not be having that discussion with council on the 14th the other aspect that 1204 01:57:20,280 --> 01:57:24,680 we've got is keep in mind is you know as i said earlier all of these tasks and efforts that we 1205 01:57:24,680 --> 01:57:29,000 work on they build upon each other based upon direction council's already given us so you know 1206 01:57:29,000 --> 01:57:34,280 ultimately council is the one that's going to be deciding whether or not this plan gets adopted so 1207 01:57:34,280 --> 01:57:38,520 these strategies really were to see and i appreciate getting your feedback on whether 1208 01:57:38,520 --> 01:57:43,400 you think that we're on target or if we were off base i thought we did pretty well we only 1209 01:57:43,400 --> 01:57:49,400 eliminated one strategy so um we will take these strategies we will continue working on this as a 1210 01:57:49,400 --> 01:57:54,920 project team on supplementing the action items some of those actions you already saw in this material 1211 01:57:54,920 --> 01:58:01,720 with all and you know if we had shy present that we'd be here till 11 o'clock this evening so we 1212 01:58:01,720 --> 01:58:05,480 we've got that information out to you in advance so you can see that's already formulating some of 1213 01:58:05,480 --> 01:58:10,280 those actions but the project team will refine those have those action items that support these 1214 01:58:10,280 --> 01:58:16,440 strategies and then we will update our discuss denton webpage as we always do when we make any 1215 01:58:16,440 --> 01:58:19,960 changes to the schedule associated with the project because i know we have several folks that are 1216 01:58:19,960 --> 01:58:25,240 interested in following this project along and be able to communicate that out so um that's our next 1217 01:58:25,240 --> 01:58:31,240 steps and we will again continue to push information out as well as to the steering committee 1218 01:58:31,240 --> 01:58:40,440 and as to what our next steps will be for the project awesome um christopher thank you chair i 1219 01:58:41,720 --> 01:58:48,120 i think there was a note about you know if there were any additional um strategies or goals yes i'm 1220 01:58:48,120 --> 01:58:53,800 sorry we should have asked was was there a strategy that you felt we left out so um 1221 01:58:53,800 --> 01:59:01,320 so based on some of the comments about the north area from other commissioners being kind of 1222 01:59:01,320 --> 01:59:06,440 separate and undetermined of when it will come in and very different from the area south of clear creek 1223 01:59:08,680 --> 01:59:15,960 i i understand that our our fiscal evaluation of this was included in the prior joint 1224 01:59:15,960 --> 01:59:25,240 session that we had with council um as i think through the implementation of of you know if 1225 01:59:25,240 --> 01:59:32,840 areas like this start to to develop uh and there are you know requests for rezoning to support 1226 01:59:32,840 --> 01:59:39,720 the plan and that sort of thing um i anticipate that we will get our fiscal evaluation for each 1227 01:59:39,720 --> 01:59:49,560 individual project and there may be comments of well this one doesn't pencil oh that's okay 1228 01:59:49,560 --> 01:59:56,680 because others will right and so i'm wondering whether it would be appropriate to kind of now 1229 01:59:56,680 --> 02:00:02,440 that the plan is a little bit more refined rerun that tool as a separate geographic section 1230 02:00:02,440 --> 02:00:12,520 south of clear creek from the north of clear creek future area in order to ensure that everybody's 1231 02:00:12,520 --> 02:00:21,960 kind of comfortable with um with the plan being fiscally sound as our comp plan asks does that 1232 02:00:21,960 --> 02:00:28,920 make sense i think i'm understanding your asks so basically you're wanting us to reevaluate the 1233 02:00:28,920 --> 02:00:34,760 fiscal impact analysis associated with the land use recommendations in the plan or did i miss that 1234 02:00:34,760 --> 02:00:41,800 yeah that's that's accurate and i think you know as we refine it through the implementation the goal 1235 02:00:41,800 --> 02:00:54,680 would be to balance those needs with other needs in in the area um just so that we we do the 1236 02:00:54,680 --> 02:01:04,200 implementation in a way that is least uh puts the least upward pressure on tax rates for for people 1237 02:01:04,200 --> 02:01:11,880 in the city does that make sense i think i'm following you um my i think let me let me just 1238 02:01:11,880 --> 02:01:19,080 say like as an example if if different zoning change applications come to us and we hear 1239 02:01:19,080 --> 02:01:24,120 here's the fiscal report for this one here's the one for this one here's the one for that one 1240 02:01:24,120 --> 02:01:31,160 i mean i i can envision a a future where it says oh well don't worry about this one because we 1241 02:01:31,160 --> 02:01:39,320 have others coming that are going to offset it or something right and and so having a basis for that 1242 02:01:39,320 --> 02:01:47,160 sort of claim as part of the outcome of the plan i think would help explain that once that that time 1243 02:01:47,160 --> 02:01:54,600 comes does that make sense i i think so i i guess i would look at this from a standpoint then uh you 1244 02:01:54,600 --> 02:02:00,680 know keep in mind that fiscal impact analysis tool that we developed was to be used for informational 1245 02:02:00,680 --> 02:02:06,600 purposes and not the sole determinant of all of our decisions um you know with this plan we did an 1246 02:02:06,600 --> 02:02:12,600 extensive amount of fiscal analysis above and beyond what we had scoped as a result of some of 1247 02:02:12,600 --> 02:02:17,640 the questions that we had received previously were to the point where if we want to do any additional 1248 02:02:17,640 --> 02:02:24,760 fiscal analysis associated with it then that either needs to be a recommended action item that is 1249 02:02:24,760 --> 02:02:30,760 included associated with or possibly a strategy we'll have to ruminate over that a little bit more 1250 02:02:30,760 --> 02:02:37,000 but um with the the land development and or the economic section of the strategy but i'm i don't 1251 02:02:37,000 --> 02:02:41,720 have the ability financially at this time related for this project to do that additional fiscal 1252 02:02:41,720 --> 02:02:46,440 analysis associated with it but that's not to say that you know if you feel that that's something 1253 02:02:46,440 --> 02:02:51,480 important that we need to include as a strategy and our action item within the plan we can always 1254 02:02:51,480 --> 02:02:58,600 we can always put that in the plan um in including you know monitoring decisions that have been made 1255 02:02:58,600 --> 02:03:04,520 as it relates to land development applications and to rezonings within the area that might influence 1256 02:03:04,520 --> 02:03:10,360 the outcome of the the fiscal impact does it would does that help address your need yeah and 1257 02:03:10,360 --> 02:03:16,280 i understand you can't commit to something that's not funded um i just i don't have the means under 1258 02:03:16,280 --> 02:03:20,520 my existing contract either right so that i just want to make sure the commission is is aware of 1259 02:03:20,520 --> 02:03:29,160 that so i'm i'm aware of that i i just think including it helps us keep that front and center 1260 02:03:29,160 --> 02:03:35,400 okay so so we can look at um possibly adding that as a strategy and our action item um 1261 02:03:36,200 --> 02:03:43,640 within the plan itself yeah okay okay any other items any other strategies anything else want to 1262 02:03:43,640 --> 02:03:50,840 be included okay uh before we adjourn i just want to say thank you to uh shy and our consultants 1263 02:03:50,840 --> 02:03:55,320 as well as a big thank you to staff now this has been a huge project you guys have undertaken 1264 02:03:55,320 --> 02:03:59,480 greatly appreciate it really appreciate your hard work and i hope that doesn't just sound like 1265 02:03:59,480 --> 02:04:05,800 smoke being blown um i don't want to just don't you know prolong our meeting just to say thank you 1266 02:04:05,800 --> 02:04:09,640 but thank you and thank you to the steering committee and the steering committee being here 1267 02:04:09,640 --> 02:04:16,120 i know it's been a lot of sweat and uh tears and hopefully not a lot of blood but uh plenty of 1268 02:04:16,120 --> 02:04:20,840 sweat and tears so uh thank you guys for your help and your assistance and being able to get this plan 1269 02:04:20,840 --> 02:04:26,440 down uh we're very appreciative of it so and uh hopefully you guys are appreciative too so uh with 1270 02:04:26,440 --> 02:04:31,080 that said no other comments uh there is no concluding items on the agenda uh so therefore 1271 02:04:31,080 --> 02:04:37,400 at 6 20 i'll convene our meeting thank you very much