Oct 25, 2023 Mobility Committee on 2023-10-25 8:00 AM
October 25, 2023 Mobility Committee 277483
Meeting Details
| Meeting Date: | October 25, 2023 |
|---|---|
| Board: | Mobility Committee |
| Video ID: | 277483 |
| Has Transcript: | Yes |
|---|---|
| Has Agenda: | Yes |
AI Summary by Dentron 3000
Meeting Summary: Mobility Committee, October 25, 2023
Key Topics and Discussions: 1. Approval of Minutes: The minutes from the September 27, 2023 meeting were approved without dissent. 2. Staff Memorandum Updates: - Bonnie Bray Road: Phase 3 awarded to Sunk Construction; notice to proceed issued for October 16, 2023. Subgrade restoration and utility work underway. - Hickory Creek Phase 3: Active construction with coordination issues with Kansas City Southern and Canadian Pacific Railway. Encore electric line relocation in progress. - Bradshaw Street & East Prairie Street: Post-rain event repairs completed; trench failure addressed under warranty. - Downtown Back-in Parking: Accident data reviewed; three total crashes recorded since 2017, with no specific correlation to back-in parking identified. - Speeding on Morse Street: Driver feedback signs installed; DCTA funding for traffic calming project in development. Community meetings held to gather input on potential modifications. - Traffic Assumptions for Eagle/Bell/Locust Roundabout: HDR report indicates roundabout would be out of function by 2030 without additional funding; growth projections used from 2020 to 2024 and beyond. - Citywide Speed Study: TextDOT responses received; some speed limit changes approved, others declined or require further review. 17 mph reduction on North Locust north of Loop 288 limited to 15 mph reduction. 3. Transportation/Mobility Project Status Report: Received and discussed, focusing on funding, let dates, and project progress for various road segments (35 North, 35 West, 288 West, 380, 288 Frontage Road, FM 1515, FM 1173). 4. Future Items and Action Items: - Pedestrian and Bicycle Safety Audit: To be addressed in a future staff memo. - Spur Connector (Loop 288 to 380): Public feedback ongoing; future presentation by John Polster. - Downtown Parking Study: Additional updates forthcoming; GIS mapping of sidewalks and bike corridors in progress. - Alma Locust Road Transfer: Resolution to be presented to Council on November 14, 2023, for eventual city ownership and reconstruction. - Pep for Drainage Issues: Integration with road adoption timelines to be discussed in a future meeting. - Outer Loop Project: Environmental clearance and alignment discussions ongoing; 14 initial alignments reduced to 7, aiming for 2 final alignments by 2025.
Motions, Votes, and Outcomes: - Approval of September 27 minutes: Passed unanimously. - No formal motions were made regarding other agenda items; discussions led to action items and future planning.
Decisions Made: - Approve September 27 minutes. - Proceed with staff updates and future presentations as outlined. - Schedule resolution for Alma Locust transfer to Council on November 14, 2023. - Continue coordination with TextDOT and DCTA for speed study and project funding.
Action Items / Next Steps: 1. Staff: Prepare GIS maps of sidewalks and bike corridors; submit resolution for Alma Locust transfer to Council by November 14. 2. Mobility Committee: Review TextDOT responses on speed study; monitor utility coordination for 288 West project. 3. Transportation Services: Continue community meetings for Morse Street traffic calming; finalize traffic assumptions report for roundabout. 4. Future Meetings: Address pedestrian and bicycle safety audit, outer loop alignment finalization, and integration of Pep for drainage issues with road adoption timelines.
This summary captures the factual content of the meeting without editorial commentary.