1 00:00:00,000 --> 00:00:04,080 Okay. It is 9.02 and we do have a quorum, 2 00:00:04,080 --> 00:00:07,280 so I'll call to order the public utilities board for 3 00:00:07,280 --> 00:00:11,300 the city of Denton on Monday, October 23rd, 2023. 4 00:00:11,300 --> 00:00:14,320 The first item is presentations for members of the public, 5 00:00:14,320 --> 00:00:16,480 and we do have Mr. Don Murky, 6 00:00:16,480 --> 00:00:22,320 who's going to speak on POB 23192 with the contract with Blink. 7 00:00:22,320 --> 00:00:26,680 Is he here? Okay. You have three minutes. 8 00:00:30,280 --> 00:00:34,120 I'm Don Murky. I live at 2005 Hollyhill Denton. 9 00:00:34,120 --> 00:00:36,120 I've lived here since '69. 10 00:00:36,120 --> 00:00:40,360 I've been driving EVs for 10 years next month. 11 00:00:40,360 --> 00:00:47,240 Became aware of this and was looking at the different things in this. 12 00:00:47,240 --> 00:00:51,560 I think there's some emissions and some errors in this proposal. 13 00:00:51,560 --> 00:00:54,840 The 110 voltage that they have on there with 14 00:00:54,840 --> 00:00:58,280 all these different pieces of equipment to do that. 15 00:00:58,280 --> 00:01:01,360 I don't understand the necessity of the 110. 16 00:01:01,360 --> 00:01:04,760 It's not viable really for EVs. 17 00:01:04,760 --> 00:01:07,720 They require a much higher voltage to charge. 18 00:01:07,720 --> 00:01:09,760 240 will work. 19 00:01:09,760 --> 00:01:12,920 I charged a 240 at my house. 20 00:01:12,920 --> 00:01:15,680 It required a 1450 plug, 21 00:01:15,680 --> 00:01:18,720 which is RV-based plug. 22 00:01:18,720 --> 00:01:21,840 I have it at 60 amps protection and charge at 30 amps, 23 00:01:21,840 --> 00:01:23,720 and it charges my vehicles every night. 24 00:01:23,720 --> 00:01:26,040 Cost me less than $100 to put in. 25 00:01:26,040 --> 00:01:29,520 I don't need monitoring with software, anything like that. 26 00:01:29,520 --> 00:01:31,080 It works very well. 27 00:01:31,080 --> 00:01:35,880 In the proposal, I noticed that they don't list what the connectors are, 28 00:01:35,880 --> 00:01:37,800 that they're going to be using on the level 2, 29 00:01:37,800 --> 00:01:40,640 which is the 240 plugs. 30 00:01:40,640 --> 00:01:45,320 Those typically in the old days were CCS, 31 00:01:45,320 --> 00:01:48,880 which is what they list for their level 3, 32 00:01:48,880 --> 00:01:50,160 which are the superchargers, 33 00:01:50,160 --> 00:01:53,080 the 60 and 150 kilowatt ones. 34 00:01:53,080 --> 00:01:55,240 This is already obsolete. 35 00:01:55,240 --> 00:02:04,640 Every manufacturer that's making a car in North America has adopted the NACS Tesla adapter. 36 00:02:04,640 --> 00:02:06,760 It's simpler, it's smaller, 37 00:02:06,760 --> 00:02:08,640 it has no moving parts, 38 00:02:08,640 --> 00:02:11,520 no switches that frequently break. 39 00:02:11,520 --> 00:02:16,920 I tried to run a company here in town using Nissan Leafs, 40 00:02:16,920 --> 00:02:19,920 which required using the CCS charger, 41 00:02:19,920 --> 00:02:22,720 and I tried to use the blink charging system, 42 00:02:22,720 --> 00:02:26,640 and I frequently had issues with their equipment being broken. 43 00:02:26,640 --> 00:02:29,200 I've driven a Tesla for 10 years next month. 44 00:02:29,200 --> 00:02:30,360 I've got four of them. 45 00:02:30,360 --> 00:02:34,680 I have yet to be a Tesla charger that is not functioned. 46 00:02:34,680 --> 00:02:37,680 We have Tesla chargers here. 47 00:02:37,680 --> 00:02:39,760 They could be used. 48 00:02:39,760 --> 00:02:43,560 The level 3 chargers that they're talking about, 49 00:02:43,560 --> 00:02:50,120 those are basically used for people that are going from Denton to Austin, 50 00:02:50,120 --> 00:02:52,000 and we want to charge on the road. 51 00:02:52,000 --> 00:02:56,240 They charge 80 percent usually in 15 to 30 minutes. 52 00:02:56,240 --> 00:02:58,640 Being for a city fleet, 53 00:02:58,640 --> 00:03:01,520 it doesn't really seem practical for the money. 54 00:03:01,520 --> 00:03:03,640 For the amount of money that this is, 55 00:03:03,640 --> 00:03:09,440 we're trying to put on the table close to a million dollars for three years to do this, 56 00:03:09,440 --> 00:03:13,480 it's obsolete when you even start into the gate. 57 00:03:13,480 --> 00:03:18,720 Next year, every car is going to have a different adapter on it. 58 00:03:18,720 --> 00:03:24,080 So this needs to be pulled and it needs to be reevaluated. 59 00:03:24,080 --> 00:03:26,360 This technology is changing, 60 00:03:26,360 --> 00:03:28,480 and I know when this was brought up, 61 00:03:28,480 --> 00:03:35,560 it probably wasn't NACS as the prevalent adapter. 62 00:03:35,560 --> 00:03:41,740 Now it is, and every manufacturer including Toyota just last week adapted that. 63 00:03:41,740 --> 00:03:45,960 So I think there's some errors in this, 64 00:03:45,960 --> 00:03:48,200 and I think we're jumping the gun on this. 65 00:03:48,200 --> 00:03:49,480 I understand we need to do it. 66 00:03:49,480 --> 00:03:51,920 So that's about all I have to say. 67 00:03:51,920 --> 00:03:53,120 Thank you. 68 00:03:53,120 --> 00:03:57,320 All right. 69 00:03:57,320 --> 00:03:59,960 No, there's no one else from the public to speak, 70 00:03:59,960 --> 00:04:02,160 so we'll go into the consent agenda. 71 00:04:02,160 --> 00:04:06,000 Does any board member wish to pull an items A through G? 72 00:04:06,000 --> 00:04:09,120 I know Mr. Rybeck was pulling two. 73 00:04:09,120 --> 00:04:13,280 As soon as he gets his mic on. 74 00:04:13,280 --> 00:04:16,000 Okay. Yes, I would like to pull items E and G. 75 00:04:16,000 --> 00:04:19,560 Okay. Item E and G. 76 00:04:19,560 --> 00:04:24,720 Okay. So do we have a motion to approve items A, B, C, D, F? 77 00:04:24,720 --> 00:04:26,240 Second. 78 00:04:26,240 --> 00:04:30,160 All in favor say aye. 79 00:04:30,160 --> 00:04:31,320 Aye. 80 00:04:31,320 --> 00:04:38,720 Okay. Item E. That is the blink contract. 81 00:04:46,760 --> 00:04:49,680 Madam Chair, board members, Michael Gagne, 82 00:04:49,680 --> 00:04:52,080 Director of Environmental Services and Sustainability. 83 00:04:52,080 --> 00:04:53,680 I do not have a presentation, 84 00:04:53,680 --> 00:04:55,600 but I can answer any questions you have. 85 00:04:55,600 --> 00:04:58,400 The primary focus of this contract is to clarify, 86 00:04:58,400 --> 00:04:59,960 is for our city fleet, 87 00:04:59,960 --> 00:05:02,200 they're not to be made publicly available. 88 00:05:02,200 --> 00:05:04,480 It's to upgrade the existing locations. 89 00:05:04,480 --> 00:05:08,520 We have about five across the city and we have one location we need to add new. 90 00:05:08,520 --> 00:05:14,440 The contract right now, we've estimated roughly 228,000 over the first three years. 91 00:05:14,440 --> 00:05:18,040 It's just what we've projected, depending on the growth of the fleet, what's available. 92 00:05:18,040 --> 00:05:22,160 They have actually in the contract given us the option to change out connectors. 93 00:05:22,160 --> 00:05:27,000 So we have options for all different types of connectors within the proposal. 94 00:05:27,000 --> 00:05:30,360 To address the DC fast charger or the level three. 95 00:05:30,360 --> 00:05:34,640 One of the reasons there is if we start getting into PDs fleet, 96 00:05:34,640 --> 00:05:43,160 we will have to have the ability to charge quickly because those vehicles cannot be parked typically for 12 or 14 hours or even six hours. 97 00:05:43,160 --> 00:05:45,720 They're used to basically 24/7. 98 00:05:45,720 --> 00:05:47,040 So that's the reason that was included. 99 00:05:47,040 --> 00:05:52,080 Level one was included because there is a portion of our fleet that averages about 30 miles a day. 100 00:05:52,080 --> 00:05:59,440 Those actually at level one done correctly can stay at 100% every week on a regular basis without less demand. 101 00:05:59,440 --> 00:06:00,960 So it's just an option in there. 102 00:06:00,960 --> 00:06:02,800 Does it mean we're going to choose it? 103 00:06:02,800 --> 00:06:04,840 I'll leave it there. 104 00:06:04,840 --> 00:06:08,200 Thank you. Miraculously, my microphone is working. 105 00:06:08,200 --> 00:06:10,040 I don't know who fixed that, but thank you. 106 00:06:10,040 --> 00:06:11,280 Thank you, Mr. Fuente. 107 00:06:11,280 --> 00:06:18,680 So, board, just so you know, all the mics are on, so just know that. 108 00:06:18,680 --> 00:06:19,560 Interesting. 109 00:06:19,560 --> 00:06:21,000 Well, thank you very much. 110 00:06:21,000 --> 00:06:23,760 I answered one of my questions. 111 00:06:23,760 --> 00:06:28,640 I think our presenter from the public did a nice job of bringing up some things to consider, 112 00:06:28,640 --> 00:06:33,600 and I'm glad that this has already been undertaken as part of the plan for this. 113 00:06:33,600 --> 00:06:38,440 I'm curious about the total value of this EV installation project. 114 00:06:38,440 --> 00:06:41,400 I'm assuming the software is only a part of it? 115 00:06:41,400 --> 00:06:42,200 Correct. 116 00:06:42,200 --> 00:06:42,880 OK. 117 00:06:42,880 --> 00:06:51,960 So do we know what the overall value of this EV charger installation operation is? 118 00:06:51,960 --> 00:06:53,760 I'm not sure I'm following the question. 119 00:06:53,760 --> 00:06:59,280 This contract is to buy the actual charger itself, kind of like buying an ATM machine as well. 120 00:06:59,280 --> 00:07:01,720 It's the product itself with the charging cord. 121 00:07:01,720 --> 00:07:07,320 And then we have the option to use their software or their connectivity on a monthly basis as well. 122 00:07:07,320 --> 00:07:12,560 So that way our fleet drivers will know if a charging station is available, they can queue in, 123 00:07:12,560 --> 00:07:16,120 get alerted, they can be alerted when their car is actually charged, things like that. 124 00:07:16,120 --> 00:07:17,480 That's the benefit to the software. 125 00:07:17,480 --> 00:07:20,800 So how many chargers are involved in this project? 126 00:07:20,800 --> 00:07:22,960 It's built out each year differently. 127 00:07:22,960 --> 00:07:28,640 The first year, we're looking between five and seven in year one, mainly level two. 128 00:07:28,640 --> 00:07:30,440 Those are different sites we have. 129 00:07:30,440 --> 00:07:35,440 In year two, depending on how availability comes on fleet, was the first year we were looking 130 00:07:35,440 --> 00:07:39,680 at doing a DC fast charger or a level three charger. 131 00:07:39,680 --> 00:07:43,240 That year, we'd probably add in roughly the same five to seven level twos as well, 132 00:07:43,240 --> 00:07:45,120 if the fleet grows enough. 133 00:07:45,120 --> 00:07:47,040 If not, that would get delayed. 134 00:07:47,040 --> 00:07:52,040 And year three is primarily focused on adding an additional level two chargers across the fleet. 135 00:07:52,040 --> 00:07:58,240 Currently, we have six full EVs in our fleet, and we do have a few plug-in hybrids as well. 136 00:07:58,240 --> 00:08:00,920 But we actually only have six currently in our fleet. 137 00:08:00,920 --> 00:08:03,240 OK. But the plan is for that fleet to grow. 138 00:08:03,240 --> 00:08:06,880 And therefore, this is to accommodate that expansion? 139 00:08:06,880 --> 00:08:13,840 Correct. And to back up one piece, one of Council's priority is to look at EV across the city of Denton. 140 00:08:13,840 --> 00:08:18,600 So we're working on a plan to look at how we help out or what we do to assist multifamily. 141 00:08:18,600 --> 00:08:20,920 What do we do in the retail restaurant sector? 142 00:08:20,920 --> 00:08:22,960 How do we do that across all of Denton? 143 00:08:22,960 --> 00:08:24,400 What do we do within our city fleet? 144 00:08:24,400 --> 00:08:27,160 What's our five-year plan for upgrading, changing out? 145 00:08:27,160 --> 00:08:28,480 How do we make that happen? 146 00:08:28,480 --> 00:08:30,840 We're working on that, and that's one of Council priorities. 147 00:08:30,840 --> 00:08:34,440 It's out there on our strategic dashboard as well, if you're interested. 148 00:08:34,440 --> 00:08:36,160 OK. Well, I did not know that. 149 00:08:36,160 --> 00:08:39,200 So I guess that's something I can go look at. Thank you. 150 00:08:39,200 --> 00:08:44,920 So do we know overall what the cost of operation of these EV chargers are up to date? 151 00:08:44,920 --> 00:08:48,080 And then for the future, do we have any projection of what that's going to cost? 152 00:08:48,080 --> 00:08:52,760 Or does DME just provide the power and grant us because it's for the city? 153 00:08:52,760 --> 00:08:58,040 We pay DME for the power like we would pay for it for any other part of operating a building. 154 00:08:58,040 --> 00:09:01,200 So DME does not provide it for free. 155 00:09:01,200 --> 00:09:03,000 I don't have an overall demand on that. 156 00:09:03,000 --> 00:09:07,680 It depends on the size of the fleet and where that stands as far as that cost. 157 00:09:07,680 --> 00:09:17,080 Do we have a cost comparison between the EV and the charging cost and then the cost of operation of a normal vehicle? 158 00:09:17,080 --> 00:09:22,560 What I can say there is typically the payback on an EV can be paid back for the difference in cost, 159 00:09:22,560 --> 00:09:25,040 whether it be fuel cost, maintenance cost, everything else. 160 00:09:25,040 --> 00:09:29,680 It's usually within that three year period, sometimes as high as five, depending on what you're buying. 161 00:09:29,680 --> 00:09:37,120 OK, so after three years, five year period, you've retired the added cost of electric vehicle charging. 162 00:09:37,120 --> 00:09:44,360 Correct. Well, and the upcharge of the vehicle itself, because most EVs are slightly higher priced currently. 163 00:09:44,360 --> 00:09:48,840 They're projected to come down to be almost cost neutral closer to 2030. 164 00:09:48,840 --> 00:09:50,600 Just depends on the growth. 165 00:09:50,600 --> 00:09:52,400 Well, that's great. It's going to get some idea of this. 166 00:09:52,400 --> 00:09:56,720 You came to us and asked for money and I was looking at it, OK, where's the rest of it? 167 00:09:56,720 --> 00:10:02,200 And the reason we're here is, you know, we do have vehicles within solid waste fleet and within DME's fleet. 168 00:10:02,200 --> 00:10:05,360 So we want to make sure that the public utility board is aware of this action. 169 00:10:05,360 --> 00:10:16,480 OK, excellent. My last question has to do with the fact this is third party software that we'll be taking into the city, into its operations. 170 00:10:16,480 --> 00:10:18,360 Actually, no, they'll operate independently. 171 00:10:18,360 --> 00:10:22,760 We will have access to their cloud, so it won't actually integrate within our network system. 172 00:10:22,760 --> 00:10:28,480 It'll be similar to what currently we have some publicly facing chargers that are done through ChargePoint. 173 00:10:28,480 --> 00:10:31,440 ChargePoint manages all that and then provides the data back to us. 174 00:10:31,440 --> 00:10:38,080 They don't actually integrate. OK, so there won't be any of the operator information, 175 00:10:38,080 --> 00:10:44,920 city information, city client information like us, the users of DME. 176 00:10:44,920 --> 00:10:47,160 No, they will not have access to anything on the city side. 177 00:10:47,160 --> 00:10:50,920 We would actually set up with them like any other account within it all. 178 00:10:50,920 --> 00:10:54,880 It would be for our users within the blank system. 179 00:10:54,880 --> 00:11:00,360 Once they get their log in, they'll be able to use that in our system as well as go outside the system. 180 00:11:00,360 --> 00:11:03,600 If we put basically a P card or a mechanism behind it. 181 00:11:03,600 --> 00:11:09,400 So if they go to Austin or if they go to Fort Worth or they go to Dallas, they can charge while they're there as well. 182 00:11:09,400 --> 00:11:13,960 Under one system, like a fuel card does right now for us under the fuel main gas cards. 183 00:11:13,960 --> 00:11:24,400 Well, one of the reasons I asked about this is every data breach that has occurred in our world has been third party software without failure, every one of them. 184 00:11:24,400 --> 00:11:32,600 So I saw this and I said, OK, we're going to have users, we're going to have data, we're going to have client information, we're going to have billing information. 185 00:11:32,600 --> 00:11:35,200 So hence my concern. 186 00:11:35,200 --> 00:11:36,800 This should be fairly simple. 187 00:11:36,800 --> 00:11:41,400 And since it would identify a unit and a user number, which would be unique to those two things, 188 00:11:41,400 --> 00:11:47,160 which would probably be meaningless to anybody in the public if I quoted off some vehicle numbers to y'all. 189 00:11:47,160 --> 00:11:51,280 I don't think y'all would know it probably wouldn't know our employee ID numbers either. 190 00:11:51,280 --> 00:11:52,960 That's really what will be in there. 191 00:11:52,960 --> 00:11:55,920 OK. Well, getting back to our guest's question. 192 00:11:55,920 --> 00:12:03,200 So how many charges do we currently have an operation for the city fleet for the city fleet? 193 00:12:03,200 --> 00:12:07,040 We have six locations. 194 00:12:07,040 --> 00:12:16,520 Most of those are dual port. One is a single port, two or single ports, meaning the plug connections to one has only two sites. 195 00:12:16,520 --> 00:12:19,400 You can connect one vehicle at a time for sites. 196 00:12:19,400 --> 00:12:26,640 You can connect up to two vehicles, dual port, dual outlets, dual whips, dual connections. 197 00:12:26,640 --> 00:12:28,600 I know, Mr. Oh, I'm sorry. Go ahead. 198 00:12:28,600 --> 00:12:31,880 No, please. No, no, no. I was just going to follow on this question. 199 00:12:31,880 --> 00:12:38,840 So what about this issue that you brought up about the connectors and the types of plugs and the within the contract? 200 00:12:38,840 --> 00:12:45,160 We have the ability to choose which ones we want to deploy and we have a cost in there to change those out if we ever need to as well. 201 00:12:45,160 --> 00:12:51,440 So they've given us a cost for repair. If one gets broken, cut damage, we have that ability within that. 202 00:12:51,440 --> 00:12:57,960 And they've said they can they can use all every universal port available is what they've told us we can choose from. 203 00:12:57,960 --> 00:13:07,400 OK, so the current half dozen locations that we have, what kinds of plugs are they currently using or do you know? 204 00:13:07,400 --> 00:13:14,200 I don't want to misspeak. They're all the older one. And I don't I don't remember which exact unit number it is. 205 00:13:14,200 --> 00:13:17,880 But we have a multitude of weird ones out there. I'll leave it at that. 206 00:13:17,880 --> 00:13:21,200 OK. Do you know what your newest ones are? OK. 207 00:13:21,200 --> 00:13:30,080 Well, it's it to our guest question then. So are there plans to update them, modernize them, make them more uniform and universal? 208 00:13:30,080 --> 00:13:34,320 That's what's phase one of the year. The first contract. Yes, yes. 209 00:13:34,320 --> 00:13:38,320 Is we're going to go in and change those because those are all some aren't in the best location anymore. 210 00:13:38,320 --> 00:13:41,680 We've done some facility upgrades, different things are not as accessible. 211 00:13:41,680 --> 00:13:45,480 We do have one site with a fleet that doesn't have a charger. 212 00:13:45,480 --> 00:13:48,600 We've done some upgrades over fleet services and that one's not as accessible. 213 00:13:48,600 --> 00:13:53,640 So we'll probably move that out towards more accessible to people going in and out of there as well. 214 00:13:53,640 --> 00:13:56,800 Well, I would like to thank our guests for coming and make presentation. 215 00:13:56,800 --> 00:13:59,920 Those are some things I certainly hadn't thought about or been aware of. 216 00:13:59,920 --> 00:14:02,640 If anybody else has any questions, feel free to dive in. 217 00:14:02,640 --> 00:14:07,880 I know Mr. Reiner had a couple and thank you for your time. 218 00:14:07,880 --> 00:14:10,360 Thank you for giving the same questions that I have. 219 00:14:10,360 --> 00:14:14,880 And I had a couple of others that came up as you talk about those six locations. 220 00:14:14,880 --> 00:14:19,720 Are those exclusive to the city of Denton for our fleet? 221 00:14:19,720 --> 00:14:23,120 Yes, they're only accessible by city of debt and fleet customers. 222 00:14:23,120 --> 00:14:30,040 We do have publicly accessible charge point sites that are generally only open to the public. 223 00:14:30,040 --> 00:14:34,040 So we have those at a couple of libraries, a couple of park sites as well as development services. 224 00:14:34,040 --> 00:14:44,240 So the stations that are on private properties, buckies or wherever, are those accessible to the city as well? 225 00:14:44,240 --> 00:14:49,160 I mean, do you have, when you said you had a charge card, could you go use those as well if needed be? 226 00:14:49,160 --> 00:14:53,280 If you're going to Austin, I would think you would have to use some kind of credit card. 227 00:14:53,280 --> 00:14:59,720 To clarify there, there are certain stations out there that are limited to the model or manufacturer you're driving. 228 00:14:59,720 --> 00:15:02,080 So the Teslas are driven for Teslas. 229 00:15:02,080 --> 00:15:02,680 Yes. 230 00:15:02,680 --> 00:15:06,160 Then we have limited use ones such as embassy suites. 231 00:15:06,160 --> 00:15:10,440 That site has a charger, but it's for their overnight guests. 232 00:15:10,440 --> 00:15:13,280 For their guests get to use that, it's not just for the general public. 233 00:15:13,280 --> 00:15:20,560 Whereas a lot of the ones over by Walmart, Kroger, those things on University or 380, anybody can use them. 234 00:15:20,560 --> 00:15:27,000 And within these networks, once you establish an account, you can basically use everybody else's sites, 235 00:15:27,000 --> 00:15:34,320 except for Tesla or if they're restricted to whether it be residents at the apartment complex or guests or things like that. 236 00:15:34,320 --> 00:15:42,480 And then the additional five to seven, the first year, are they specific? 237 00:15:42,480 --> 00:15:49,880 Seven or five different locations or just additional power towers, I'll call it, in the current locations. 238 00:15:49,880 --> 00:15:52,680 It's actually kind of like we did in this room before you got here. 239 00:15:52,680 --> 00:15:54,680 We're going to refresh the current sites. 240 00:15:54,680 --> 00:15:59,320 We're only going to add one new charging site in year one, which would be development services. 241 00:15:59,320 --> 00:16:04,000 We have two vehicles there that do not have overnight access to a charger. 242 00:16:04,000 --> 00:16:05,600 They're going to other locations currently. 243 00:16:05,600 --> 00:16:09,840 And then one other question, I think. 244 00:16:09,840 --> 00:16:15,000 Presently, we have about six EV vehicles in the fleet, is that correct? 245 00:16:15,000 --> 00:16:22,120 And I did not realize this, but you're saying that the council wants us to expand that, which I can understand. 246 00:16:22,120 --> 00:16:26,360 Do you have a projection on what we're looking at as to what additional? 247 00:16:26,360 --> 00:16:29,680 How large is the fleet going to be next year, let's say, if that's possible? 248 00:16:29,680 --> 00:16:31,360 And what kind of vehicles are we? 249 00:16:31,360 --> 00:16:33,760 How big does it go as far as the vehicles? 250 00:16:33,760 --> 00:16:38,160 Is it just a sedan or does it go up to past pickups, whatever? 251 00:16:38,160 --> 00:16:40,480 And is it a question that I can ask in public? 252 00:16:40,480 --> 00:16:43,120 You can. We're not quite there yet. 253 00:16:43,120 --> 00:16:45,080 We've had some change outs, different things. 254 00:16:45,080 --> 00:16:48,240 We're working closely with fleet services to build that plan. 255 00:16:48,240 --> 00:16:50,080 That's part of that overall council direction. 256 00:16:50,080 --> 00:16:54,080 One piece of that is for us to be looking heavily at a five year cost replacement. 257 00:16:54,080 --> 00:16:57,720 And so how we can look at how we transition the fleet to EV. 258 00:16:57,720 --> 00:17:03,200 Currently on the market, you do have vehicles ranging anywhere from a small sedan up to at least a light duty pickup. 259 00:17:03,200 --> 00:17:05,360 There are some medium duties. They're just not quite there. 260 00:17:05,360 --> 00:17:10,240 There's very limited heavy duty, but our primary focus initially be the light duty fleet, 261 00:17:10,240 --> 00:17:14,600 which would be anything from a sedan up through a pickup truck, just depending on availability. 262 00:17:14,600 --> 00:17:17,440 Again, the supply chain issue has been part of our challenge. 263 00:17:17,440 --> 00:17:20,280 We try to do some orders a year and a half ago. 264 00:17:20,280 --> 00:17:24,200 They haven't processed. We're still trying to do five new orders currently. 265 00:17:24,200 --> 00:17:28,720 And I've been told now those may not go in go in until January. 266 00:17:28,720 --> 00:17:33,280 And if they go in in January, I don't know when they'll deliver. 267 00:17:33,280 --> 00:17:43,120 OK. So when the when the fleet is expanded, is that is that an issue that will be brought before us before it's done? 268 00:17:43,120 --> 00:17:45,840 Or is that already carte blanche done? 269 00:17:45,840 --> 00:17:49,120 I wouldn't say it's carte blanche. That's part of what fleet services works on. 270 00:17:49,120 --> 00:17:55,520 And depending on which purchases are going on and which funds are paying for those pieces of that may come back through. 271 00:17:55,520 --> 00:17:59,720 But again, if it's more general fund driven, those kind of things, it wouldn't come back to this board. 272 00:17:59,720 --> 00:18:04,040 So no. All right. Thank you. Thank you, Madam Chair. All right. 273 00:18:04,040 --> 00:18:07,720 Oh, go ahead. Go ahead. Good morning. How are you doing? 274 00:18:07,720 --> 00:18:10,640 I knew you had to have one. Yeah. 275 00:18:10,640 --> 00:18:15,160 So I think I have two questions in the price evaluation. 276 00:18:15,160 --> 00:18:18,320 The level three charger prices weren't included. 277 00:18:18,320 --> 00:18:25,480 And it seems like that could be a significant cost, like one might be 20 times as expensive as a level two charger. 278 00:18:25,480 --> 00:18:32,680 Funny you use that number. It's about it is about that procurement as we work through that, we've got prices on everything. 279 00:18:32,680 --> 00:18:39,360 The list in there, I'm looking, I don't know, I don't see Laurie in the room. 280 00:18:39,360 --> 00:18:44,520 We cleaned it up to make sure that we had a clear basis to make sure we were comparing apples to apples. 281 00:18:44,520 --> 00:18:50,800 So the primary cost comparison was focused in on the level two, which would be the primary use across the city. 282 00:18:50,800 --> 00:19:01,640 The level threes did come in. My memory on blink as a manufacturer, they were actually lower on the level DC fast chargers level threes. 283 00:19:01,640 --> 00:19:11,760 Now, the challenge there to speak to my predecessor speaking earlier, there's about seven or eight different tiers of DC fast charging out there. 284 00:19:11,760 --> 00:19:21,160 So I'd have to go back and look and each proposal to make sure that specifically they were cheaper on what we're what we tried to compare against within that. 285 00:19:21,160 --> 00:19:27,560 OK, and then I'm following on Commissioner Rybeck's question about cost. 286 00:19:27,560 --> 00:19:40,160 I know personally, I have an E.V. and, you know, two gas powered vehicles and the the cost to run it, the cost to operate and maintain it is like a small fraction. 287 00:19:40,160 --> 00:19:43,160 Ten or 20 percent of the cost of a conventional vehicle. 288 00:19:43,160 --> 00:19:55,920 But I know in a fleet, it's different. So I'd I'd love to see in a year or two just to kind of an update on, you know, what's the difference in fleet cost for maintenance and fueling effectively. 289 00:19:55,920 --> 00:19:59,000 And to add to that, that's one thing fleets really focused on. 290 00:19:59,000 --> 00:20:08,080 Currently, we're trying to put GPS units and all of our fleet to get really accurate information to know the use and demand on those vehicles to be able to do that comparison back. 291 00:20:08,080 --> 00:20:20,800 Thank you. Madam Chair, I'll just ask Devin if you could bring that up at our management when we get to our management section and then we can make sure that there's there's agreement that for us to do that and we can add it to our future agenda items. 292 00:20:20,800 --> 00:20:25,800 OK. All right. Any further questions? 293 00:20:25,800 --> 00:20:39,320 I move approval of agenda item. Thank you. You'd be twenty three one ninety two. Do we have a second second. All in favor say aye. 294 00:20:39,320 --> 00:20:55,880 Carries. Next is twenty three one ninety four contract with S.E.A. Towers Limited for some transmission. And Mr. Ryback pulled that one off. Yes, I'm the guilty party. 295 00:20:55,880 --> 00:21:00,240 More code, it's an already engineering answer. Any questions regarding still poles? 296 00:21:00,240 --> 00:21:08,360 Yes, sir. Thank you for joining us this morning. I appreciate it. I don't really have any problem with the purchase of this equipment, but it brought some questions to mind. 297 00:21:08,360 --> 00:21:21,080 Sure. Which are this is obviously part of a larger effort to put in this new service line. So I was curious if we at this time know the total project value. 298 00:21:21,080 --> 00:21:27,800 And my other question is, so what's driving this upgrade to this particular service line? 299 00:21:27,800 --> 00:21:41,880 Well, as far as value, we have the cost. I'm not sure if that's what you're asking for. The total cost of the project. The total cost will be around five point six million dollars for this contract. 300 00:21:41,880 --> 00:21:54,200 For this contract, for just the material. Yes, sir. Just the material. That part I see. I'm asking no, sir. I do not know. I do not have that. OK, I can look into it and get back with you. 301 00:21:54,200 --> 00:22:04,120 I would appreciate that. That's kind of my question. I understand we're buying all this hardware to make this project possible to increase the size of the service line. I get that. 302 00:22:04,120 --> 00:22:12,520 So something's driving that and that total cost of the project. There must be some number out there. And I'd just like to know what it is. 303 00:22:12,520 --> 00:22:19,080 I think Jerry. Mark Zimmer is going to come up here and give you a response to that. Thank you. 304 00:22:19,080 --> 00:22:29,400 Yes, sir. Mark Zimmer, DME Engineering. Total project cost for this is about 14 million. About 14 million. And what is driving the upgrade to this service line? 305 00:22:29,400 --> 00:22:37,320 Our studies have shown that this line is overloaded. It's currently overloaded. By the year 2025. 306 00:22:37,320 --> 00:22:44,440 Could you tell us what area it currently serves? Well, it's part of the transmission system, so it generally serves a large area. 307 00:22:44,440 --> 00:22:52,840 I couldn't pinpoint an exact area, but it generally serves the industrial side of town. So the west side of 35. 308 00:22:52,840 --> 00:22:57,320 OK, so Peterbilt, Touchback, all those customers on the west. All right. 309 00:22:57,320 --> 00:23:02,920 And the good news, Mr. Rebecca and for the board, this is part of our transmission cost of service. 310 00:23:02,920 --> 00:23:14,360 So we do earn a rate of return on that as well. So we'll be seeing a large portion of that project will be basically reimbursed back to DME over the course of a number of years. 311 00:23:14,360 --> 00:23:21,400 As part of that uplift program that it's done through the ERCOT grid. Well, thank you. Appreciate that. 312 00:23:21,400 --> 00:23:28,440 OK, so got a rough total value of the project. Know where it's going. And those are my questions. Thank you very much. 313 00:23:28,440 --> 00:23:34,680 Do we have other questions? OK, seeing none, do we have a motion to approve? So moved. 314 00:23:34,680 --> 00:23:47,480 Moved. Do we have a second? Mr. Rayner, second. All in favor say aye. Aye. That carries. Next is approval of the October 9th, 2023 minute meeting. 315 00:23:47,480 --> 00:23:54,120 Meeting minutes. Did anybody see any changes or corrections? 316 00:23:54,120 --> 00:24:02,600 Seeing none, do we have a motion to approve the minutes? So moved. Mr. Rayner. I'll take second. OK, Mr. Black moved in. Mr. Rayner takes second. 317 00:24:02,600 --> 00:24:15,240 All in favor say aye. Aye. Next is item PUB 23135, General Capital Program Expenditures for Bonds. Certificates. 318 00:24:15,240 --> 00:24:22,440 See if I can get this out of my eyesight a little bit there. Good morning. Randy Klingle, Treasury Manager with the Finance Department. 319 00:24:22,440 --> 00:24:31,520 I have a short presentation today, maybe. There it goes for me. Ma'am, could you speak more into the microphone? Thank you. 320 00:24:31,520 --> 00:24:38,120 How's this? This better? Better. OK. Much. I'm a little height challenged here, but I'll make it work. 321 00:24:38,120 --> 00:24:44,200 I have an annual reimbursement ordinance that we bring to you every year before we start the bond process. 322 00:24:44,200 --> 00:24:48,480 And the reason for the reimbursement ordinance is because it's required by the IRS. 323 00:24:48,480 --> 00:24:56,240 It shows that our intent that we're going to reimburse ourselves later with bond proceeds that come through the bond sale later this summer. 324 00:24:56,240 --> 00:25:03,760 Normally we do the bond sale 12 months after this ordinance is executed. We do like to finish it by the end of the fiscal year. 325 00:25:03,760 --> 00:25:12,240 So we will have this done by by September always so we can receive the proceeds of the same fiscal year that we have this reimbursement ordinance. 326 00:25:12,240 --> 00:25:19,880 And our debt policy that governs our debt and our bond sale items do include the opportunity to have this ordinance. 327 00:25:19,880 --> 00:25:26,560 So today we are only covering the utility project items for this board to oversee, and I will not be going through the project items. 328 00:25:26,560 --> 00:25:30,360 They are exactly the same as you saw September 26 go through council. 329 00:25:30,360 --> 00:25:34,360 So nothing has changed there, but we will be just covering the utilities. 330 00:25:34,360 --> 00:25:44,720 So the first utility we have for today is solid waste, which their capital improvement plan project budget for this fiscal year is just a little bit over seven million dollars. 331 00:25:44,720 --> 00:25:54,240 And in your back up, you have a couple of little narrative sentences about each fund program that kind of gives you an overall narrative of what these projects will do for them this fiscal year. 332 00:25:54,240 --> 00:26:07,600 But you also have this presentation, which will give you the line item detail water project for the this fiscal year is eighty two point seven million dollars for their fund for the projects for this year. 333 00:26:07,600 --> 00:26:13,080 Wastewater's budget is fifty five point nine million dollars. 334 00:26:13,080 --> 00:26:20,520 And last, we have the electric fund with eighty two point five million dollars for their capital improvement, but budget for the reimbursement ordinance. 335 00:26:20,520 --> 00:26:33,160 So in summary, for just the utilities, solid waste water, wastewater, electric, we have two hundred and twenty eight million three hundred and forty one thousand one hundred and fifty seven dollars in their capital improvement plan budget. 336 00:26:33,160 --> 00:26:47,080 So our next steps, I'll come back to you guys in April for the notice of intent, which I'll bring the same list to you, possibly reduced depending on how things go as they look at their project timelines or cost and what their availability of projects are. 337 00:26:47,080 --> 00:26:56,600 And then in May, we'll come back with the bond parameter ordinance, which will be our our final push with our final numbers on this list, and they will have a projected sell in June. 338 00:26:56,600 --> 00:27:06,800 And then we'll receive our proceeds in July, and that's kind of the annual process that we have for this. And we kind of maintain that same timeline year over year. 339 00:27:06,800 --> 00:27:21,120 Yes, wrong way. There we go. Any questions? Yes, ma'am. So this is a bond obligation or bond sale for this year to cover the next two fiscal years. 340 00:27:21,120 --> 00:27:28,840 Well, we will get the proceeds this year and then they will allocate them and use them as it comes up and necessary for their contracts with the future. 341 00:27:28,840 --> 00:27:34,000 OK, so this is for this year. Do we do this essentially every year? 342 00:27:34,000 --> 00:27:41,440 Essentially every year. Yes, we have a lot of capital projects. So we do do this becomes an annual annual annual chunks, if you will. 343 00:27:41,440 --> 00:27:45,800 Yes. OK, thank you. And this isn't actually the bond sale. 344 00:27:45,800 --> 00:27:54,000 It's just authorizing us to go ahead and go ahead and do the reimbursement right and then reimburse ourselves when we get the proceeds. 345 00:27:54,000 --> 00:28:02,360 Just want to clear that up. Yes, ma'am. Other questions? Do we have a motion to approve this item? 346 00:28:02,360 --> 00:28:16,160 So, Mr. Do we have a second second and seconds? All in favor say aye. Aye. Next item is P.B. twenty three one eighty three wholesale transmission charges. 347 00:28:32,360 --> 00:28:51,520 Where'd it go? That's what he's thinking. 348 00:28:51,520 --> 00:28:57,200 You're just trying to make us feel good. Yeah, I don't see my presentation. 349 00:28:57,200 --> 00:29:12,040 In my packet, it's called presentation dash five, if that helps you. 350 00:29:12,040 --> 00:29:18,240 You may want to go to the Web site and just pull it off of there. OK, yeah, that might be quicker. 351 00:29:18,240 --> 00:29:39,240 Apologize. No, no problem. 352 00:29:39,240 --> 00:30:08,400 Need some help is yes, sir. Is it over here? 353 00:30:08,400 --> 00:30:15,000 All right. Yes. Good morning, Madam Chairman and board member of P.B. 354 00:30:15,000 --> 00:30:20,520 I'm here today to discuss transmission cost of service expense. 355 00:30:20,520 --> 00:30:27,080 These are routine expenses that the electric fund incurs every single year, basically. 356 00:30:27,080 --> 00:30:38,280 We're bringing this to the board for transparency purposes, and these expenses has already been approved in the budget. 357 00:30:38,280 --> 00:30:52,520 So this slide right here just represents some of the external vendors that will be paying or external providers that will be paying. 358 00:30:52,520 --> 00:30:57,240 And this is going to come around about seven point one million dollars. 359 00:30:57,240 --> 00:31:07,160 So this is the cost that the city will pay for using other providers transmission assets pretty much. 360 00:31:07,160 --> 00:31:21,840 And this next slide is just we're just listing some of the other providers that will be using that is basically under the fifty thousand dollars just for transparency purposes. 361 00:31:21,840 --> 00:31:26,120 Any questions or comments? Go ahead. 362 00:31:26,120 --> 00:31:32,440 Thank you, Madam Chair. So I have I have a general understanding of transmission cost of service. 363 00:31:32,440 --> 00:31:37,720 We and this is just a kind of required payment within our code. 364 00:31:37,720 --> 00:31:48,160 Everybody pays to use the shared grid that moves power from the various generators to the various consumers. 365 00:31:48,160 --> 00:31:56,880 But I'd like to just understand a little bit more about these the individual transactions here are. 366 00:31:56,880 --> 00:32:07,080 I've always seen transmission cost of service just kind of summed up as kind of a fee based on four CP peak. 367 00:32:07,080 --> 00:32:21,800 Is that then just allocated out based on some other factor and every load serving entity in ERCOT pays the same kind of fractions out to the various vendors? 368 00:32:21,800 --> 00:32:28,320 Or are these like individual kind of bilateral transactions for the different vendors? 369 00:32:28,320 --> 00:32:33,560 Kind of a technical question, but I'm just trying to understand how this works in a little more detail. 370 00:32:33,560 --> 00:32:39,840 Yes. So let me summarize. So basically all these all these service providers. 371 00:32:39,840 --> 00:32:43,560 This is a dollar amount that is calculated, like you said, from the four CPs. 372 00:32:43,560 --> 00:32:49,400 And then basically this is our cost to using basically their transmission assets. 373 00:32:49,400 --> 00:32:52,360 And this is for the new fiscal year that's coming up. 374 00:32:52,360 --> 00:32:57,000 So I hope that answer your questions or maybe Tony can help. 375 00:32:57,000 --> 00:32:59,640 It looks like yes. So so you're exactly right. 376 00:32:59,640 --> 00:33:03,800 It's based on your load ratio share. Right. 377 00:33:03,800 --> 00:33:08,800 Both in how you charge other providers and in how you pay other providers as well. 378 00:33:08,800 --> 00:33:16,840 So it's all distributed based on that four CP is calculated every year, June, July, August and September. 379 00:33:16,840 --> 00:33:21,560 It's kind of it's the average of that. And so that applies to every utility out there. 380 00:33:21,560 --> 00:33:24,280 And so there's some utilities where we net out. 381 00:33:24,280 --> 00:33:31,400 And so we ended up having to pay because because we owe them more that they owe us or or they owe us more than than we owe them. 382 00:33:31,400 --> 00:33:38,720 And so so that's how that's done across across all the TSP's transmission service providers in the state. 383 00:33:38,720 --> 00:33:42,960 That was my other question. These are already netted of our transmission. 384 00:33:42,960 --> 00:33:50,360 Yes. And going back to that transmission ROI from that transmission project that was being discussed earlier, 385 00:33:50,360 --> 00:33:59,120 that transmission ROI would would lower these net outs in the future in future years. 386 00:33:59,120 --> 00:34:09,960 Yes, correct. And so a high level currently we pay out in a single fiscal year about twenty five, twenty eight million dollars total. 387 00:34:09,960 --> 00:34:14,800 This is only a portion of that. There'll be others that will come to you. 388 00:34:14,800 --> 00:34:23,200 What we've been earning prior to our latest TCO case was over 60 million dollars just for comparison purposes. 389 00:34:23,200 --> 00:34:27,520 As you know, we recently had a filing. There was a final order. 390 00:34:27,520 --> 00:34:32,400 We anticipate that that revenue that we get is going to come down to about 30 million dollars a year. 391 00:34:32,400 --> 00:34:37,200 So we're still we're still getting a little bit more than what we're paying out. 392 00:34:37,200 --> 00:34:41,400 Not quite the calculation, right. But but just for comparison purposes. 393 00:34:41,400 --> 00:34:45,000 So you have all the information. Thank you for that question. 394 00:34:45,000 --> 00:34:48,200 Oh, go ahead, sir. You're closer. You go. Oh, you're too kind. 395 00:34:48,200 --> 00:34:52,640 Could you go back a slide or two? I was just curious. Another one. 396 00:34:52,640 --> 00:34:54,800 The first one. No, go back to go back where you were. 397 00:34:54,800 --> 00:34:58,240 Yes. Yes. It's just like I'm at my house and they don't. 398 00:34:58,240 --> 00:35:04,120 It's OK. It works. So all of these description, is this what we're paying or is this what they're paying? 399 00:35:04,120 --> 00:35:07,120 Is this where we're getting additional? So what is that? 400 00:35:07,120 --> 00:35:11,720 So basically, these are the dollar amounts that the city is paying out. 401 00:35:11,720 --> 00:35:16,480 So this is our cost for using transmission assets from other providers. 402 00:35:16,480 --> 00:35:23,240 And these are all. Now, is this a is this generally the same characters that we use? 403 00:35:23,240 --> 00:35:27,640 Pardon the pun throughout the history of it? Yes, exactly. 404 00:35:27,640 --> 00:35:31,560 And so if I understand then, Madam Chair, this was approved by the budget. Yes. 405 00:35:31,560 --> 00:35:36,640 So the city council's already approved this. So is this just more or less this is what we're doing and hope you like it? 406 00:35:36,640 --> 00:35:41,040 Because there's not really any changes we're making, is it? Just for transparency. Exactly. 407 00:35:41,040 --> 00:35:44,960 Thank you. Transparency important. Transparency purpose. Thank you for your time. 408 00:35:44,960 --> 00:35:48,360 My question is, you mentioned these ratios that we pay out on. 409 00:35:48,360 --> 00:35:52,600 Where do those come from? Are those from the PUCT or? 410 00:35:52,600 --> 00:35:57,840 Yeah. So so they're calculated based on what's called the four CP of the four coincident peaks. 411 00:35:57,840 --> 00:36:01,240 It's the highest use in June, July, August and September. 412 00:36:01,240 --> 00:36:10,360 That's average. And that that load share is what's what all these are based off of for everybody in the ERCOT market. 413 00:36:10,360 --> 00:36:13,200 Thank you. All right. 414 00:36:13,200 --> 00:36:21,320 Further questions. Do we have a motion to approve? So move seconded. 415 00:36:21,320 --> 00:36:25,120 All in favor say aye. Aye. 416 00:36:25,120 --> 00:36:35,760 OK. Next item is PUB one ninety five. Consider a contract with Felix Felix Construction Company for the ropes and ranch water reclamation plant lift station. 417 00:36:35,760 --> 00:36:56,280 Oh, excuse me. Good morning. How are y'all? 418 00:36:56,280 --> 00:36:59,160 My name is David Brown. I'm water utilities project manager. 419 00:36:59,160 --> 00:37:03,880 Today, I'm going to bring to you ropes and ranch plant lift station improvement. 420 00:37:03,880 --> 00:37:07,080 This is a phase one of the improvements out there. 421 00:37:07,080 --> 00:37:12,320 As you know, ropes and ranch community south on 35 going towards Fort Worth. 422 00:37:12,320 --> 00:37:22,120 So 20 years ago, they actually installed a wastewater plant out there that actually treats water on site, the wastewater. 423 00:37:22,120 --> 00:37:26,760 And so they have a permit out there. And this was put in in play about 20 years ago. 424 00:37:26,760 --> 00:37:34,680 They have permit out there of close to one M.G.D. per day. And right now they have reached 90 percent of that T.C.Q. permitted flows. 425 00:37:34,680 --> 00:37:40,680 So T.C.Q. has a rule 75 90 rule at 75 percent of the permitted flows. 426 00:37:40,680 --> 00:37:45,720 You're being designed and at 90 percent, we're being construction. 427 00:37:45,720 --> 00:37:56,120 So with this, this plan of action is to convert the existing east lift station over to convert it over to it's going to be a lift station, 428 00:37:56,120 --> 00:38:05,040 but it's going to pump into directly into connection that capital projects delivered that actually go into our Pecan Creek water reclamation plant. 429 00:38:05,040 --> 00:38:09,560 So we're utilizing a new gravity and a force made that's been recently put in. 430 00:38:09,560 --> 00:38:14,000 We're going to connect that over. What this does is it relieves 40 percent of those flows. 431 00:38:14,000 --> 00:38:19,320 We're going to take 40 percent of those flows and put it into our regular treatment over at Pecan Creek. 432 00:38:19,320 --> 00:38:24,640 Like I said, the east lift station pumps will be upgraded and also the piping will be upgraded. 433 00:38:24,640 --> 00:38:30,400 What this does is twofold. It splits the flows up basically east and west. 434 00:38:30,400 --> 00:38:33,200 On the west side, it'll go over to the plant like we do now. 435 00:38:33,200 --> 00:38:40,600 There'll be a little bit of improvements on the SBR plant with disinfection. 436 00:38:40,600 --> 00:38:44,360 At the same time, we'll split our flows and go east, we'll go over to our Pecan Creek. 437 00:38:44,360 --> 00:38:48,640 So that'll increase the capacity over there at ropes and at this time. 438 00:38:48,640 --> 00:38:52,640 And like I said, this is phase one. There are other opportunities. We'll go into phase two. 439 00:38:52,640 --> 00:38:58,800 There's other opportunities which may be upgrading the plant or making a lift station connected to a gravity. 440 00:38:58,800 --> 00:39:05,080 Of course, we want to try to get away from lift stations and plants. We want to go to gravity on that. 441 00:39:05,080 --> 00:39:08,760 So with that, we have a contract. 442 00:39:08,760 --> 00:39:16,280 We'd like to have approved for contract with Felix Construction at two point nine million dollars, three hundred ten days for construction. 443 00:39:16,280 --> 00:39:23,400 Like I said, this is phase one and ropes and has we entered an agreement with ropes in the 2019 to help fund this. 444 00:39:23,400 --> 00:39:30,800 So a lot of the funding is coming from ropes and community be glad to answer any questions. 445 00:39:30,800 --> 00:39:38,360 Yes. So the current water treatment plant on the west side of the community that was built by the community. 446 00:39:38,360 --> 00:39:42,120 Yes, sir. It's owned, owned, operated by the city. 447 00:39:42,120 --> 00:39:50,200 That's all it is. So it is a city. We do have an operator over there. The city operates it, but ropes and community built it. 448 00:39:50,200 --> 00:39:52,560 Yes. OK. So the city operates it. 449 00:39:52,560 --> 00:40:11,280 So the city, in order to meet these T.E.C.Q. requirements is going to put this project, take a large percentage of the effluent flow and move it over towards the new Concrete treatment facility. 450 00:40:11,280 --> 00:40:15,240 Well, it's not the new. It's our existing concrete so upgraded. 451 00:40:15,240 --> 00:40:28,400 I apologize. What they the CIP group delivered a project as far as a force main to this lift station and then gravity along ropes and when under thirty five and connects over to the country lakes addition. 452 00:40:28,400 --> 00:40:33,360 And then, of course, that actually leads into our concrete plant over there off of Mayhill. 453 00:40:33,360 --> 00:40:37,040 Yes, sir. OK. Makes perfectly good sense. Thank you. 454 00:40:37,040 --> 00:40:39,560 So I have a question. Thank you. 455 00:40:39,560 --> 00:40:44,040 Obviously, we realize there's so much growth out there and more houses coming and such. 456 00:40:44,040 --> 00:40:52,120 I was curious with that last comment you made as that gravity fed goes underneath thirty five and is connected to that other large subdivision. 457 00:40:52,120 --> 00:41:04,240 Is this line going to be potentially being connected with other are you planning on having being connected with other subdivision developments going on or will they be parallel? 458 00:41:04,240 --> 00:41:16,040 When you said phase one, do you see another potential lift station or such on that side of the west of thirty five for covering all of these? 459 00:41:16,040 --> 00:41:23,200 The thought process with the initial project was to make that plant into a lift station, which can be converted. 460 00:41:23,200 --> 00:41:28,520 The plant right now actually treats wastewater, just doesn't pump it, treats and discharges into a creek. 461 00:41:28,520 --> 00:41:46,880 The plan is is to be able to make that a lift station because you already have the capacity, their lift station and float and actually pump reverse flow to this lift station that we're going to convert right now and and basically pump it into our conventional system that we have now. 462 00:41:46,880 --> 00:41:51,480 And it's a boy. Sorry. Avoid running a plant out there at Robson. 463 00:41:51,480 --> 00:42:02,760 So it is you have and I'm thinking phase two, phase three and such that will just be further expansion of that plan to take care of the additional demands that will be coming on that side. 464 00:42:02,760 --> 00:42:12,080 Yes, sir. Right now, this is kind of this is a alleviate and helps right now to be able to split that flow so you can have more capacity on that west side. 465 00:42:12,080 --> 00:42:27,080 And then it gives us some time in order to plan. If a developer comes in and puts in a gravity line on that north side of that plant, you know, a hundred coal addition can put a gravity line and then we can tie into that. 466 00:42:27,080 --> 00:42:35,240 So and with that effect, the capacity where we would need to come back to do another seventy ninety that you were talking about, not that we know of. 467 00:42:35,240 --> 00:42:43,840 It's been studied that not we know of that gravity line will alleviate a lot of that course. There's plans for another plant. 468 00:42:43,840 --> 00:42:51,320 So we have, you know, that that wastewater mass plant spells out a lot of that to take care of those that growth on that west side of thirty five. 469 00:42:51,320 --> 00:42:54,960 Thank you for your time. Thank you, Madam Chair. The question. Go ahead. 470 00:42:54,960 --> 00:43:11,560 Well, I have another question for me. It's curiosity. It's outside the scope of this project. I recognize. But we have those two new Hunter and coal ranch developments going in basically between ropes and ranch and the thirty five W. 471 00:43:11,560 --> 00:43:17,440 So are they also going to tie into this new east connector that you're building? 472 00:43:17,440 --> 00:43:23,240 Not that we know of there. They're as far as I know, they're going to build their own interceptors on that side. 473 00:43:23,240 --> 00:43:27,520 And they're also going to flow to Pecan Creek as of now, as of now. 474 00:43:27,520 --> 00:43:33,480 OK, thank you. Oh, I don't want to think the master plan for the wastewater can test somewhere. 475 00:43:33,480 --> 00:43:40,920 We can see that on the city website. I don't know if it's all been if it's been we haven't approved it yet. 476 00:43:40,920 --> 00:43:49,840 It's under review. The wastewater plants will see that coming to us coming to us at a future date soon. 477 00:43:49,840 --> 00:43:52,200 Thank you very much. All right. 478 00:43:52,200 --> 00:43:59,440 Other questions. Or do we have a motion to approve? 479 00:43:59,440 --> 00:44:01,400 So moved. Thank you, Mr. Pluck. 480 00:44:01,400 --> 00:44:05,600 And do we have a second, Mr. Rybeck? 481 00:44:05,600 --> 00:44:10,520 I'm going to abstain from voting since I'm employed by ropes and ranch HOA. 482 00:44:10,520 --> 00:44:15,840 So. All in favor, I'm abstaining. 483 00:44:15,840 --> 00:44:21,640 Thank you. Last item is management reports. 484 00:44:21,640 --> 00:44:25,840 Madam Chair, members of the board, a couple of few items that we have for you. 485 00:44:25,840 --> 00:44:32,360 One, we had a response to a question Mr. Rybeck had asked regarding the Spencer generation station. 486 00:44:32,360 --> 00:44:37,960 And what I'll say about this is that just remember that the Spencer generation station, 487 00:44:37,960 --> 00:44:43,960 even though it's next door to DME's campus, is not owned owned by DME nor the city of Denton, 488 00:44:43,960 --> 00:44:46,600 actually owned by Garland Power and Light. 489 00:44:46,600 --> 00:44:50,960 But we did provide some information back to Mr. Rybeck, hopefully, to answer your question. 490 00:44:50,960 --> 00:44:54,520 If not, I'm happy to answer anything else you may have on that. 491 00:44:54,520 --> 00:44:57,360 No, I thank you. I did read this prior to coming to the meeting. 492 00:44:57,360 --> 00:45:00,200 So thank you very much. Appreciate it. 493 00:45:00,200 --> 00:45:03,520 It was just curiosity. Obviously, it used to be our asset. 494 00:45:03,520 --> 00:45:06,280 It's right next to our op center. 495 00:45:06,280 --> 00:45:13,040 See, we have this big resource here and it's obviously in close proximity to our transmission system. 496 00:45:13,040 --> 00:45:17,040 So it seemed like something would be good to know about. So thank you. 497 00:45:17,040 --> 00:45:25,880 And feature agenda items. So December 11th, we have on schedule the Wastewater Master Plan 498 00:45:25,880 --> 00:45:30,880 that will be coming to you by that department. They're still working on that. 499 00:45:30,880 --> 00:45:35,760 And we'll begin that over to you and certainly be a work session with you. 500 00:45:35,760 --> 00:45:38,400 And then new business action items. 501 00:45:38,400 --> 00:45:42,320 The one item that we had was a request from Mr. Rybeck on the Spencer station. 502 00:45:42,320 --> 00:45:48,640 So we've provided a response to that. Happy to answer any other questions or if there's any other requests. 503 00:45:48,640 --> 00:45:58,560 I would like to make a request, as I stated earlier, regarding what information the fleet fleet has on 504 00:45:58,560 --> 00:46:03,520 EV operation versus conventional ICE vehicles. 505 00:46:03,520 --> 00:46:06,400 And I understand that it might take a while to gather data. 506 00:46:06,400 --> 00:46:10,560 So if this is appropriate in six months or a year, that's fine. 507 00:46:10,560 --> 00:46:19,680 I just wanted to just kind of begin to get an understanding for fleet at the fleet level, what the cost difference is. 508 00:46:19,680 --> 00:46:25,720 Yeah, well, we'll get it added. And I'll talk to Tom Gremer, who's the director of fleet operations and make him aware of it. 509 00:46:25,720 --> 00:46:32,000 Thank you. I do have a question for a future agenda, which is my third party software question. 510 00:46:32,000 --> 00:46:39,120 It really occurred to me that we've talked a lot about various and sundry software systems and automated billing and things of that nature. 511 00:46:39,120 --> 00:46:49,280 So I'd like to know what steps the city is taking to protect our information from data breach from via third party software vendors. 512 00:46:49,280 --> 00:46:53,360 Yeah, let me let me visit with our technology department about that. 513 00:46:53,360 --> 00:47:00,200 Also, our legal department to make sure that that's something that can come to the border and how how it would come to the board. 514 00:47:00,200 --> 00:47:03,240 But certainly, I'll get back to you in response to that. 515 00:47:03,240 --> 00:47:13,000 Thank you. And again, this blink system and then the software and I got to thinking about all the third party software breaches that our data has suffered. 516 00:47:13,000 --> 00:47:21,840 So I would be curious to know what steps the city is taking since we're obviously in the business of adding more vendor software to our universal systems. 517 00:47:21,840 --> 00:47:29,760 Yeah, certainly a high priority item for us as a matter of fact, that tomorrow several of us are attending a cybersecurity training down in Rowlett. 518 00:47:29,760 --> 00:47:38,360 So it is something that is high on everybody's mind as we deal with a multitude of data and information. 519 00:47:38,360 --> 00:47:43,640 So. And we're on to concluding items. 520 00:47:43,640 --> 00:47:51,320 Does any board member wish to say anything to the public or have something put on a future agenda? 521 00:47:51,320 --> 00:47:56,520 OK, seeing none, do we have a motion to adjourn? 522 00:47:56,520 --> 00:47:59,400 Thank you. Thank you, Mr. Taylor. We're adjourned.