Sep 27, 2023 Planning and Zoning Commission on 2023-09-27 5:00 PM

September 27, 2023 Planning and Zoning Commission 272684

Meeting Details
Meeting Date: September 27, 2023
Board: Planning and Zoning Commission
Video ID: 272684
Has Transcript: Yes
Has Agenda: Yes
AI Summary by Dentron 3000

Meeting Summary: Planning and Zoning Commission Date: September 27, 2023 Time: 5:00 PM (Work Session) / 6:30 PM (Regular Meeting) Location: City Hall, Denton, TX

Key Topics and Discussions - Work session addressed agenda clarifications and two staff reports: progress on the Design Downtown Denton master plan update (project scope, public engagement strategy, boundary considerations, and Quaker Town Park concept development) and the proposed Streetlight Criteria Manual with corresponding Denton Development Code (DDC) amendments to resolve compliance issues and standardize lighting requirements. - Regular meeting covered consent agenda approvals, individual plat reviews, public hearings on street lighting code amendments and a specific use permit, and a project matrix update. - Public hearing for S23-0002 (Stuart Apartments) included community comments regarding traffic safety, building height, sunlight obstruction, and construction impacts. Staff and the applicant addressed questions regarding site access, road widening, buffering, and on-street parking. - Project matrix update covered recent DDC amendments approved by City Council, upcoming area plan activities, and acknowledgment of a departing commissioner.

Motions, Votes, and Outcomes - Approval of September 13, 2023 minutes: Passed 5-0. - Consent Agenda (FP23-0019d, PP23-0007b, FP23-0013a): Passed 5-0. - FP23-0022b (Townsend Green Phase 2 Final Plat): Approved without conditions. Passed 5-0. - FP23-0016b (Riney Elementary Final Plat): Approved with condition requiring civil engineering plan approval. Passed 5-0. - FP23-0024 (Oak Vista Preliminary Plat): Denied; extension granted to October 25, 2023. Passed 5-0. - FP23-0025 (Golden Point Industrial Final Plat): Denied; extension granted to October 25, 2023. Passed 5-0. - DCA23-0008 (Street Lighting Standards Code Amendment): Approved. Passed 5-0. - S23-0002 (Stuart Apartments Specific Use Permit): Recommended for approval to City Council. Passed 3-2.

Decisions Made - Commission approved the final plat for Townsend Green Phase 2 and the final plat for Riney Elementary School, contingent on civil engineering plan approval. - Commission denied plat requests for Oak Vista and Golden Point Industrial but approved extension requests for both until October 25, 2023. - Commission approved amendments to DDC Sections 7.11.6C and 7.11.6D to update street lighting standards and formally reference the new Streetlight Criteria Manual. - Commission voted to recommend approval of the Stuart Apartments Specific Use Permit to City Council, permitting increased building height up to 53 feet with required height transition buffering and off-site road improvements.

Action Items or Next Steps - Staff to coordinate with City Council on selection of compliant streetlight fixtures and implementation of the Streetlight Criteria Manual. - Design Downtown Denton team to continue Phase 1 public engagement, including an online survey, Quaker Town Park visioning workshop (October 7), and downtown visioning workshop (December 4). - Southeast Denton area plan intercept surveys scheduled for late October. - Northeast Denton area plan schedule to be revised and communicated, with a potential special PZC meeting anticipated for November 1. - Staff to follow up with public commenters regarding utility and construction coordination for the Stuart Apartments project. - Commission to monitor upcoming DDC implementation items and area plan progress per the project matrix.

Agenda Chapters
1. 2. Clarification of agenda items listed on the agenda for this meeting
0:27 - 15:20
2. B. Receive a report and hold a discussion regarding progress on the Design Downtown Denton plan.
15:20 - 41:41
3. A. Receive a report, hold a discussion and provide suggestions or recommendations regarding the creation of a City of Denton Streetlight Criteria Manual and proposed amendments to the Denton Development Code (DDC) regarding streetlights and said manual.
41:41 - 50:59
4. 1. PLEDGE OF ALLEGIANCE
50:59 - 51:35
5. 2. CONSIDER APPROVAL OF THE PLANNING AND ZONING COMMISSION MINUTES FOR:
51:35 - 52:08
6. 3. CONSENT AGENDA
52:08 - 52:41
7. A. Consider a request by Pulte Homes of Texas, L.P. for a Final Plat of the Townsend Green Phase 2 Addition. The 27.959-acre site is generally located on the south side of Pederson Creek Way, approximately 2,400 feet south of East McKinney Street, in the City of Denton, Denton County, Texas. (FP23-0022b, Townsend Green Phase 2, Julie Wyatt)
52:41 - 54:05
8. B. Consider a request by Denton Independent School District for a Final Plat of the Riney Road Elementary School Addition. The 15.135-acre site is generally located on the south side of Riney Road, approximately 560 feet east of Bonnie Brae Street, in the City of Denton, Denton County, Texas. (FP23-0016b, Riney Elementary, Julie Wyatt)
54:05 - 55:06
9. C. Consider a request by Linken Real Estate, LP, for a Preliminary Plat of Oak Vista Addition, Phase 1. The 21.802-acre site is generally located west Lane Street and Mockingbird Lane and north of the terminus of Trailhead Lane, in the City of Denton, Denton County, Texas. (FP23-0024, Oak Vista, Julie Wyatt)
55:06 - 56:12
10. D. Consider a request by Golden Point Industrial Investors, LLC. for a Final Plat of the Golden Point Industrial Addition, Lot 1, Block A. The 10.579-acre site is generally located just west of IH-35 and approximately 2,100 feet south of West University Drive (US-380) in the City of Denton, Denton County, Texas. (FP23-0025, Golden Point Industrial, Mia Hines).
56:12 - 57:24
11. A. Hold a public hearing and consider making a recommendation to City Council regarding amending the Denton Development Code, amendments include, but are not limited to, amendments to Sections 7.11.6C and 7.11.6D related to revising street lighting standards and adding a reference to the Streetlight Criteria Manual. (DCA23-0008, Street Lighting Standards Code Amendment, Aaron Bennion)
57:24 - 61:54
12. B. Hold a public hearing and consider making a recommendation to City Council regarding a request by Stuart Apartment Properties, LLC for a Specific Use Permit to allow for an increase in the maximum permitted height for a proposed multifamily dwelling use on an approximately 2.695-acre lot generally located at the southwest corner of Loop 288 and Stuart Road in the City of Denton, Denton County, Texas. (S23-0002, Stuart Apartments, Mia Hines).
61:54 - 91:54
13. 6. PLANNING & ZONING COMMISSION PROJECT MATRIX
91:54 - 96:45
14. 7. CONCLUDING ITEMS
96:45 - 98:23
Transcript
15885 words
Good evening and welcome to the work session for the Planning and Zoning Commission for September 27th. My name is Tim Smith, I'm the Vice Chair and I'll be calling meeting to order at 502. Let the record stand that Commissioner or Chair Ellis will be absent tonight. So with that said, we'll move forward to our work session item. I don't think we have any citizens here to comment on consent agenda items. So we will move forward. It's a clarification of agenda items listed on the agenda for this meeting. Starting with the consent agenda, do any commissioners have any questions for consent agenda items? Okay, seeing none, we'll move forward to items for individual consideration starting with FP23-0022B. There was a late email that was sent in, this is presented by Julie, changing this to approval without conditions. Does Julie have a presentation, anything you want to talk about there? I do, let me pull this up. Good evening, Julie Wyatt. This is FP23-0022B, this is phase two of Townsend Green, I know you all have seen this a couple of times before. Single family residential development on the south side of McKinney. Phase one is currently under construction and they are proposing phase two. If you recall your last meeting, you approved this with a condition regarding a development agreement associated with the park property that's going to be dedicated on the south side of the tract. That was approved by council last night, so that removes the condition, satisfies it, and staff has changed the recommendation to approval without any conditions. I'll be happy to answer any questions. Any questions for Julie? I'm just curious, I know McKinney Street, I'm not familiar with the other, Peterson Creekway, where exactly is this located? It is actually, it's east of Ryan High School, it's as you're going toward the lake. All righty, thank you very much. Any other questions for Julie? All righty, Julie, the next one is yours, FP23-0016B, Riney Elementary. All right, so this is a final plat for Riney Elementary. It is located on the north side of town, kind of northwest off of Bonnie Bray and south of Riney Road. They have satisfied all of the requirements for the final plat, but they still have a couple of items related to their civil engineering plans. That's not gonna change the easements on the property or the boundaries of the property, it's just working through a little outfall structure, a couple of things. So staff is recommending approval of this plat with a condition that the civil engineering plans need to be approved before final, final approval. Okay, any questions for Julie on this one? Commissioner Pruitt? Just to be a little bit new vocabulary, could you define outfall structure? That's just one I haven't heard before. It is the structure, and I'm gonna use layman's terms here, but it's the structure that kind of bridges that detention pond to our sewer system and kind of slows that water. Got it. Thank you. My understanding. It's an improvement associated with drainage, so storm sewer, not sanitary. Oh, did I say sanitary? I'm sorry. You just said sewer in general, so I wanted to make sure we were talking about that. Gross. Sounds good. I was kind of scratching my head, too. I was like, "Oh, didn't know." I know, right? I wanted to make sure I said that was... Sorry. Was it 1604? Got it. Okay, any other questions for Julie? Okay, seeing none, we'll keep on moving along with the Julie Train FP23-0024 Oak Vista. All right. So, this is another single family residence, or I'm sorry, it is a duplex development that you have seen a couple of times. It is located south of McKinney, west of Loop 288, kind of between the future Dutchess Extension and McKinney. They have a preliminary plat approved. They are now moving forward to the final plat stage. They do have some things that they need to correct in order to meet all of our requirements so staff is recommending denial. However, we have no objection to their requested extension to October 25th, and I'll be happy to answer any questions. Any questions for Julie? Okay. All right. Three for three, Julie. Thank you. Thank you. Batten Cleanup is Mia Hines with FP23-0025. It's not the first time that was said, Batten Cleanup. No, Mia Hines, Associate Planner. This is a final plat for Golden Point Industrial. One of the things that they need to fix on themselves is their name. Among other things, that this is not ready for staff's recommendation of approval. It doesn't meet our criteria for approval, but we have no objection to the requested extension which could be granted to October 25th, 2023. With that, I'll take any questions. They put the wrong name on there? They did. Yeah. They've used a preliminary plat, and then they're civil, so they changed the project name and they didn't go back to it. Understood. Any questions for Mia? Okay. Seeing none. Thanks, Mia. I appreciate it. Okay. With that, we'll conclude our items for individual consideration. Moving forward to our public hearing starting with 5A DCA 23-0008, as presented by Aaron. There he is. Binion? Binion. All right. Binion. Got it. Thank you. All right. Thank you. Let me get this pulled up for you. Again, thank you. I'm Aaron Binion with DME Engineering, and here to talk a little bit about street light requirements in the Denton Development Code. A little bit of background, so street lighting requirements used to be covered by the City Code of Ordinances. When the Development Code was created, some of those requirements were transferred over. DME was tasked with reviewing that recently to see, basically to check on some compliance issues, we were notified by citizens that had caught that some of our lights were in compliant with the new Development Code requirements. We have Cobra Head lights throughout the city, and those meet our current requirements, but our Acorn post-top style lights do not meet requirement C, as shown here. In paragraph 7.11.6C, it talks about a light that does not emit any uplight. It's a full cutoff light, is how they describe it. Our current Acorns don't meet that, and so as part of our attempts to become compliant with this, we would like to be able to move forward, and at present, we are working with the City Council to select a light that does meet that requirement for residential developments, but rather than make that requirement retroactive to all existing lights, our recommendation is to slightly modify the wording and request that all new developments install this light, and moving forward, we can be compliant. And then also in the Denton Development Code, the last requirement, 7.11.6D, talks about a light that does not emit any light onto neighboring properties. Unfortunately, the physics of that, neighboring properties could be a foot away, depending on where the pole is placed, and so it's just not feasible to enforce that requirement. That said, DME has been tasked with creating a street lighting criteria manual, and this manual covers installation requirements, it covers the developer responsibilities and the city responsibilities, and it follows national standards for lighting, and so our recommendation is actually that we implement this street lighting criteria manual, and that that last requirement simply refer to the new street light criteria manual instead. So here's the recommended wording for each of those sections. Before I move on, any questions on that? We will be having a work session report on the street light criteria manual, so if you have any questions about that, not to say hold your questions for that at that time, but anything on 7.11.6C or D. Okay, seeing none. So our recommendation is simply that those changes be approved, and that's it for us. All right, any questions for Aaron? All good? Thank you, Aaron. Appreciate it. Thank you. Okay, it takes us to 5B, S23-0002, we'll be holding a public hearing, consider recommendations to the Council on Steward Apartment Properties, LLC, presented by Mia Hines. Good evening again, Mia Hines, Associate Planner, just a quick summary, I have a full presentation that I'm prepared to present in the regular session, but a quick summary. This is a request for an SUP for a multifamily building located on an MN property or proposed on an MN property, exceeding the height, exceeding 41 feet in height, essentially. The maximum building height within the MN district is actually 65 feet, but when it's adjacent to residential properties, anything proposed between 41 feet and 65 feet does require a specific use permit. One of their buildings has a 53-foot building height, and so they are requesting that that height be approved as a part of the specific use permit. The request is consistent with our criteria for approval, as well as our future land use map, so staff is recommending approval, and I did get a clarified version of their site plan, which shows direct connections directly to Stewart Road from the building, and we'll flesh out whether the ADA compliance and all that stuff with building permits and civil engineering plans as well. So with that, were there any questions? Yeah, I received an email from a citizen with concerns regarding potentially posing a hazard to drivers northbound on Stewart Road who were turning right on Loop 288, as well as drivers on Loop 288 turning left. Have you heard about these concerns at all by chance? So drivers on Loop 288 turning left? And drivers northbound on Stewart Road was the main concern, who were turning right onto Loop 288. Okay, so yeah, of course, we have those site visibility clearance requirements that will be or were checked with this site plan, as well as will be checked with our civil engineering plans to make sure that where that stopping point is for that intersection, that those buildings are set back enough and any landscaping is cut back enough to meet those requirements. And then you said left, left onto two, I'm sorry, I didn't. I think I was reading that wrong. Okay. Just that. Okay, yeah. Okay. And for clarification for this one, this is a sort of T intersections to a road doesn't continue through Loop 288. So it would just be that that right turn movement onto Loop 288 or right turn movement off of Loop 288 onto Stewart Road. Thank you. And just one additional question, did the applicant perhaps give a reason why they didn't host a public meeting considering this is in a well lived in single family neighborhood? They did not, but they are here if you want to pose that question either to now or they'll be prepared to speak during the regular session as well. I can ask them during the session. Okay. Thank you. We'll ask them during the session. Commissioner Colman. Thank you, Vice Chair. Mia is, would this property be included into the Northeast Denton Area Plan? It is just outside the bounds sort of to the southwest of that Northeast Denton Area Plan. Thank you. Any other questions for Mia? Mia, can you show me, I was looking at the site plan and it's hard to see on there. That left or that diagonal from left to right of the triangle, those are all parking lots. Those are all parking spaces, correct? And then the buildings are going to be pretty much along 288 and Stewart. So do we have measurements of essentially, obviously the site itself will not be set back from the neighbors, but do you have numbers of what the set the setback is from the building? Yeah. Thank you. There are dimensions on here specifically related to the buildings. This is an exhibit that I had to sort of show the building heights and transition zone requirements that we have, which requires that properties within, I'm sorry, buildings located within 50 feet of that residential property, maintain a maximum building height of 40 feet, buildings between 50 feet and 100 feet, cannot go over 55 feet and then beyond that is 65 feet. So what you see in that green area is beyond 100 feet. The site plan for building B, it looks like that one might be at like 61 feet and then that building A is of course further back from that, but I can get exact dimensions for you if you want to know that. And the screening and buffering within there, it is just along the residential section, correct? Correct. Okay, understood. And then on ingress and egress from 288 onto Stewart, will this property require a change, substantial change to Stewart for any type of traffic mitigation because of the property, I'm doubting that's going to require any type of traffic mitigation to a tech stock road of Luke 288. Correct. Yeah, so they did submit a TIA and that TIA came with recommendations of a center left turn lane within Stewart Road. So they are proposing that as part of this development, those offsite improvements, as well as of course those pedestrian assets, that 10 foot wide side path within Stewart Road as well. Okay. But there would be no slower speed up lanes on 288. No, the TIA didn't warrant that. Gotcha. Understood. Okay, understood. Okay. Any other questions for Mia? Okay. Cool. Thank you, Mia. Appreciate it. All right. With that, that concludes all of our agenda review items we have for tonight. Moving us to work session reports. We do, we are making a change to the work session reports in order. We will be addressing 3B first and then 3A second, so starting with 3B, PZ23-191, report and whole discussion regarding the design downtown Denton plan. Good evening, everyone. Cameron Robertson, Historic Preservation Officer. And with me, I have Sean Jacobson, Associate Planner. And we are really excited to be here with y'all tonight. We are going to just start to give you all kind of that insight into the design downtown Denton plan. So it was our, it's our downtown master plan update, which was done in 2002. So we're going to just kind of be walking you all through what we've done so far, the project team and all that. So let's get started. So the first kind of topics that we're going to be running through, as I say, is that project team, our consultant staff who are on this, as well as that project background as to why we're doing this right now, then we're going to be going into a project overview, which will be going over our scheduling and the current phases that we're in right now. Then we're going to be covering public engagement, what we're doing as you guys have the coasters and stickers thus far on in front of you. So that's a little bit of that public engagement. We're going to go into a little bit further and then our upcoming events that are part of our phase one. So starting off with our city of Denton team, we have Tina Fergens, our planning director, Gary Packin, who is our parks director, myself as the project manager, Sean Jacobson as the deputy project manager, and then Wayne Emerson, unfortunately, has left for the town of Addison as of two weeks ago. So we have Erica Sullivan, who's kind of stepping in for the economic development director role and will be helping us in the meantime. So our consultant, absolutely wonderful consultant that we have here is Men Collaborative. They are based both in Minneapolis and Austin, Texas. So the project manager for Men Collaborative is Zach Lockram. Todd Austin is one of the associate planners. He's been helping a lot with data and kind of that note taking and assistance on that public engagement that we've been having here as of late. Michelle Bright, she's the principal in charge. She is really focused in landscape architecture design, environmental design, natural resources and all that. We also have Sandy Molnars-Kolmstok. She is the lead landscape architect, so she's going to be really helping with the Quaker Town Park new plan. But in addition to the Men Collaborative team, we do have additional members. As Sean and I are going to kind of discuss through this presentation, we have a lot of key areas that we're focusing on here in downtown. But we did want to highlight those additional team members. We have Post Oak Preservation, who's specifically focused on historic preservation and that creating new policies perhaps. William Fulton Group, which is focused on economic development. Nelson Nygaard, which is looking more at that parking, mobility, that multimodal transportation that we need downtown. Then we have the Catalyst Group, which is looking at market research and that transit-oriented development strategies. So diving into the project background, so as I stated, the reason that we are starting on this design downtown Denton plan is we really need to update our master plan that was done in 2002. It's been over 20 years. We've seen a lot of growth in Denton, but also in the downtown area. And we need to kind of figure out what our different priorities are for the downtown neighborhood. So it's going to be looking at open space. It's going to be looking at mobility, new housing, affordable housing, preservation, as I stated, and connectivity to the surrounding areas and within downtown itself. So as the purpose is stated, we have that existing downtown plan. We have to respond to those development interests, especially to the south, where we're coming out of the floodplain along Elm and Locust. We really want to position downtown for long-term success. This is going to really guide how downtown develops over the next 20 years. So we want to do it right. And we want the community to be fully backing this plan and be really excited about what comes in the future. We're also addressing how downtown influences those nearby neighborhoods, as I stated. And then really develop a new plan for Quaker Town Park. How is it going to be utilized? We have so many festivals here held all year round. Is it being used to the best of its capability, but also incorporating that history of Quaker Town Park, the O'Neill structures, and seeing where we find that balance. So project overview. Does anyone have questions thus far? Just wanted to-- OK. And we're good. Awesome. So this is our study area. As you can see, we don't have a boundary right now. As I talked about, we have that connectivity. We're really trying to figure out where downtown connects to those neighboring communities, both to the west-- those are historic districts, UNT campus, TWU to the north, northeast, and then southeastern to the southeast. So really trying to figure that out. So there's no set boundaries for this as of right now. And there potentially might not be any boundaries moving forward. But right now, we do have it highlighted by that darker brown of what we think it might be in terms of downtown. But I wanted to state that compared to the other area plans that you've seen, you've seen that really thick boundary of what is included. Right now, we don't know, because downtown connects to so many different areas. And it does have that impact on other areas. The project brand, as you guys got the stickers, we're really excited. We designed Downtown Denton. We talked with the consultant. And we really felt that downtown is great. When you talk to citizens of Denton, people love downtown. They want to see it thrive. So we have a good foundation. But how do we design it in such a way that it becomes better? Or even where we're able to feed economic development, historic preservation, all the different things. So in this design itself, this highlights our five key areas, which I'm going to touch on. But we did have a local artist who did this and was commissioned, Jude Landry. I'm excited about this. The consultant's proud of it. We're proud of it. And hopefully, you guys put that on a water bottle. I put it on my car already. So hopefully, you're excited. So the project branding, as I stated, these are split into five key categories. We have historic preservation, arts and culture, development and small businesses, mobility and parks. So those are really the main focus areas that we want to focus on in our design downtown Denton plan. So this gives a little bit more detail that development and small businesses really preserving what we have now and growing on those small businesses and giving other people opportunities to start new enterprises if they want. In terms of mobility, looking at walkability, but also multimodal, whether that includes bikes, transit, trains, buses, cars, as you can see. As we know, arts and culture is huge here. We have the Arts and Jazz Fest. We have the Blues Festival that was here this past weekend. We are known for our music here in Denton, but also in downtown. We have Dan Silverleaf, we have Rubber Gloves, we have a bunch of different businesses that cater to that. So, how does downtown help contribute and shape to arts and culture that currently exists? But how do we make that grow? And then historic preservation, obviously dear to my heart. How do we preserve those historical assets, but also build on that? How do we do infill properly? How do we look at the urban design aspects? How do we start to tell the story of Denton and where it started and where it all began? And then lastly, our parks and public spaces. Finding a fresh new look for Quaker Town Park, whether that is just adding new trails, adding new bridges, more connectivity, but also looking at adding additional parks in downtown, along Elm and Locust to the south or maybe it's to the north, finding pocket park areas options. So really starting to think of what does downtown need and what does it need in the future? And with that, I'm going to hand it over to Sean. He's going to be covering our schedule and going a little bit more in depth into our different phases. Any questions? Oh, yeah. Yeah. Just first off, I love a lot of what you're saying and it's great to see that historic preservation is such a key part of y'all's platform. Just a quick question on the philosophy of the map being kind of nebulous. I do have just slight concerns when it comes to Southeast Denton. And I know there have been concerns regarding gentrification in the area. Maybe if we do want to set some delineated lines between downtown Denton and Southeast Denton, just to make sure everyone feels as if their opinions are being included and we're not trying to step over the Southeast Denton toes and all that good stuff. No, of course. And as you can see, it's kind of delineated right now along South Bell Avenue. And that was actually due to feedback that we received during that Southeast Denton visioning workshop that was held a couple of weeks ago by Julie and Mia. So that's kind of where we're starting because that's what the community considered to be the boundary of Southeast Denton. Great. Thank you. Of course. One just, you know, I think we've been hearing this for a while of we're doing a downtown area plan. And I know it's designed, designed downtown, right? Designed downtown Denton. Sorry, I didn't want to script your grade branding that you got going on. When are we drawing borders? Because we've been talking about it as kind of like, we don't have borders for this yet. We don't have borders for this yet. We don't have borders for this yet. At some point in time, we have to, we have to draw a line in the sand with a terrible pun. So yeah. I don't want to take that. Sure. So great question. You know, part of, part of how we determine project area is through our public engagement efforts. And so I think Sean's going to talk about all of our public engagement associated with this project. But to Cameron's point earlier, you know, with this project happening simultaneously with the Southeast Denton project, you know, one of the things that we're trying to hear from the Southeast Denton community is really what do they consider Southeast Denton? And so taking that feedback and then partnering that with the other project that we're working on with downtown. Over time, it's possible we may draw more defined boundaries associated with downtown, but also, you know, downtown's the core of the city in many respects and serves many of the surrounding neighborhoods. And one of the things we actually talked about with the Southeast Denton Steering Committee is can downtown provide opportunities for residents within Southeast Denton? And I would say can downtown provide opportunities for residents within all of the other surrounding neighborhoods? You know, one of the key things is we want to make sure that all areas of our community are successful, right? And especially when you have two areas that are near each other or next to each other, then we want both areas to be successful and how can they support? So you know, we'll, as we go through the public engagement and continue that effort on Southeast, but also as this project, then that may help crystallize that area for both even more. We also might find that through the public engagement efforts that there are some areas that might be viewed as being shared between the two, but we don't know that yet. So we'll keep you updated as we continue to work on both projects. Great. Thank you, Tina. All right, Sean. All right. Fantastic. And just to that point, yeah, we are, as much as we are really moving along, we're actually still in phase one, we are very focused on gathering that data and feedback that will help to inform what's coming later, which at the end of that phase one will be what we call a case for action, which will be basically laying out what is the current state of downtown that necessitates some new ideas and what are the great things that we want to keep. But we have to really do a good job of gathering our information, our data first. But actually, prior to even phase one, we had a phase zero where we brought our consultants in, they got to meet with city staff to talk about concerns and priorities. We also were able to give them a tour of downtown, both driving and walking so they could really get a feel for what things are wonderful and what things could need some work. You know, if you've heard people talk about sidewalks that are difficult, we made them walk over some tough areas to make the point like, hey, this can be better, this can be great. And their response was, wow, Denton really loves Denton. You guys are at a point where a lot of places, we have to still get cities to there where they actually care about their downtown. Your downtown cares about it already. So they were very, they gave us kudos in terms of where we are already, gives us great foundation work from. We are now in the midst of phase one and you'll see those are not stock photos. Those are real photos of engagement we've been doing over the last few weeks here. We're out at arts and autos, we were out at Blues Fest, we were at parking day, really asking people, Denton, what do you love about downtown? What does downtown need? And even giving people a chance to put pins on a board to say, hey, I love this thing here. Don't mess with that. Or, hey, I have a great idea for this area or I have a concern about this area. Really getting some fantastic feedback. And again, that goes to understanding the needs in the area and helping to build that case for action for the future so that we can lay out a vision that we know actually reflects what the people of Denton consider important and what they need and not, you know, what we think or what the consultants think. Part of that, as you'll see there, what we call pop-up events, so that's being at arts and jazz, that's being at arts and autos, other events, we'll talk about coming up soon, but also, crucially, we have an online survey that is online now and that QR code on the coaster in front of you will get you there. That is really important. We want to hear from as many folks in Denton as possible. They can go on there and, again, talk about what they love about downtown, what it needs, give their ideas. There's even a photo contest as part of that. You can take a picture of downtown, people can vote on that, but we really, really want to get good engagement on that so that our case for action truly reflects the breadth of the ideas and thoughts of our Denton residents. So just note here, we had our first advisory group meeting. We have a fantastic team of 20 folks representing stakeholder groups across downtown. They were able to kind of get the full presentation and begin to give their feedback to the consultants and they'll be involved throughout this process, helping to connect with the community, make sure that what we're thinking is going out to the community and that the thoughts of the community are coming back to us through them. And then, as we noted, Parking Day, Blues Fest, got a ton of great engagement on us. It was really cool to hear from families, residents across the board. So with that, I'm going to hand things back to Cameron to talk about some of the public engagement we have coming up. So as Sean stated, we're doing a lot of public engagement, including our artwork that was done by Jude Landry. We also have the funds and the means to connect with other local artists as we move along through these phases to really engage that local economy and get people. Downtown as Sean was saying, downtown is so vibrant. We have a lot of artisans amongst us and it's something that we really want to highlight with this downtown plan. Also, as a QR code, we have that online social platform. So as Sean said, definitely use it, share it with family, share it with friends, share it with colleagues. The more feedback we get, the better, not only for the consultant to produce great policies and goals, but it will be what the community wants. We have been doing door-to-door business surveys. We've been going to business owners thus far and surveying why they want to be in downtown, what they like about it, if they're willing to assist with future marketing. And those have been really good feedback thus far. Sean's been great. He's been coordinating a lot of that. As we stated, our community workshops. We have community workshops coming up, which we'll talk about a little bit later. But those are really going to be engaging the community in person so they can talk with the staff, talk with the consultant, and really voice their opinions and what they really want to see in the future in downtown. Those pop-ups and speak-outs that Sean was talking about. Also, stakeholder interviews and focus groups. We did have some initial stakeholder interviews when they officially kicked off in July. But also, we have focus groups coming up here in the future, one of which is going to be the descendants of our-- the descendants of Quaker Town residents. So that's going to be one of the focus groups that we really want to have that community engaged so that we can get feedback on what Quaker Town parks should be in the future. And then that advisory group team that Sean was talking about. So online survey and advertising materials. I know we are drilling this in so much, and you probably don't want to hear it. But it is such a great resource. We really just, like we said, really just share it. It's really fun. It's super interactive. There is a photo competition. You can get a $25 gift card to a local retail store if you win that photo competition. But if you're in and around downtown, you'll see coasters out at different restaurants and bars and even some shops. You'll start to see posters out and about. We have the stickers that are out. Sean and I just spent about two hours today putting up one sign. So you'll see those around downtown now as well when you're walking down the sidewalk. But we really, really, really want y'all's feedback. It's very important and it's vital to the success of this plan. Some of the upcoming phase one steps that we're doing. We have our Quaker Town Park Visioning Workshop. So that is going to be held during Arts and Jazz Fest on Saturday, October 7th. So next weekend, there's going to be three different booths. It's going to be set up on the -- what side of the park? It'll be the Tim Powers UNT stage adjacent to the Senior Center. There we go. So staff will be -- and the consultant will be out there from 9 a.m. till 9 p.m. So definitely stop by. Give us your feedback. Give us your thoughts. And there's going to be a lot of great kids activities. So if you have little kids with you, they will be very focused on that while you can give us your feedback. We're also going to be doing additional community surveys. So currently the website does have those surveys of what you want in downtown, what you love about downtown. But there are going to be additional surveys being added to that over time. As Sean said, we are going to have continuous public engagement. You'll see us out at Twilight Tunes. You're going to see us at Wausle Weekend. We're starting to look at certain speak out events that we want to be a part of so we can really have those more formal conversations with members of the public. Our second advisory group meeting, that's going to be held in late November. And then our downtown visioning workshop, which will include a bit about Quaker Town as well, will be in early December, Monday, December 4th is when it's planned for. So we're really looking forward to that as well. But that is all we have to share. If you guys have any questions. Commissioner Cole. Thank you, Vice Chair. Four years ago, we created what was called the downtown development district, right? Is this new thing? Yeah. It was just downtown centric though, just the square. Is this going to take place of that or is that still going to be in place? So there is the downtown PID, the Public Improvement District, so that's still in place. And it's a TIF district, if you will, tax increment financing zone. So that's still in place. And I know, I think council had conversations with our economic development team earlier this summer about whether or not the boundaries of that should be expanded. Keep in mind, that is a financial mechanism tool to be able to help with doing some of the improvements within downtown. There's some flexibility can be used also, I think, for some economic development opportunities. But it is one of the tools that we, the city, have in order to be able to implement items that could come out of our updated downtown plan. We're talking about two different things. I'm talking about where we restricted the heights to two stories. The square district. The square district. Oh, the square district. Yeah. So is this going to replace that? No, this isn't going to replace that. This is just going to be in addition. Okay. In addition to. Okay. Thank you. So once we finish this master planning effort, right, to update the downtown plan, it could have recommendations or recommended action items included as part of it, right? So like all three of these plans we're working on, we talk about the implementation action items. So this project will have that as well. But one of the action items coming out of this particular project could be to modify some of the zoning in downtown. And so, or make certain refinements to existing zoning district. And remember, because zoning is one of the tools that cities have in order to be able to implement some of the action items that come about as a result of master plan efforts. And I will say actually our folks with post stroke are specifically reviewing the Denton square district and with the desire to look at, Hey, are there additional helpful standards we can add to that ways we could refine that. So they're specifically reviewing that to give those recommendations. Thank you. If I could add one thing, I believe it was Cameron's portion of the presentation. She talked about Quaker Town Park. So one of the unique components associated with this master plan that we're working on is truly a master plan for Quaker Town Park and coming up with a concept for the Quaker Town Park. It'll take into consideration the existing historic assets that are there, but also the needs of the park and how the park is used. So one of the things that will come about associated with this is a fairly well refined concept plan for the park to be able to help support our parks department in especially some of the events that they have in addition to how do we address the events of Quaker Town from 100 plus years ago, right? So that is one unique aspect that is associated with this project. And then as part of our downtown master plan update efforts, then that concept plan for Quaker Town Park will then provide the foundation for the parks department to be able to move forward within doing additional improvements within the park itself. It'll have coordination with the Historic Landmark Commission because given that the park is designated, there's some work that we'll have to do there. But just know that that's, like I said, that's one of the kind of a unique aspect associated with this particular project that you're not seeing in some of the other area plan work that we're doing. Thank you, Tina. Commissioner Pruitt. Thank you, Chair. Or Vice Chair. You can just call me Tim, guys, it's all good. So I'm really excited about this. Thank you for all the work, it looks amazing. I guess I would just like to offer my encouragement that the rest of this body be patient with the whole question of boundaries. The way I see it, the downtown is unique in that it's not a neighborhood that is not a destination for people from around the city. It's a place that is an obvious destination as well. And by nature of that, several of the aspects that you talked about, housing, mobility, that some of -- I would envision some of the recommendations and thoughts would have implications outside of whatever boundaries we drew, just by nature of the type of updates and regulations that would be required to actualize the plans and the visions that the community reaches out with. And I'm also really excited that we get this in there because recent plans that we've done have been very good with identifying those action items and following through with that. And every time I come down here, I'm sad that we never codified the original DTIP cross street section requirements for Elm and Locust, and then tech stock came through and put in five foot sidewalks. So I'm looking forward to that, thank you. Only thing I'd add in there, can we get more of either of these? Yes. We have a lot. We don't have them with us, but we can get them for you. Okay. Great. Awesome. Love to take them. Take a whole stack of them. Okay. Perfect. Love to have them. So, okay. All right. Before we move on to work session item 3A, going through the street light criteria mantle, I want to take a recess here at 543 to allow us to go get dinner in the back. And then we will reconvene shortly. So I'll say about 10 minutes. It's 544 now. So try to be back by 555. We'll start eating dinner and go through the next item. And for the Planning and Zoning Commission, thank you for giving us a chance to do the recess. We will continue on our meeting, reconvening at 553 p.m. with Work Session Report 3A, PZ23-186. Give a report and discussion providing the City of Denton Street Light Criteria Manual as presented by Aaron Binion. Okay. So, this will be quite similar to what you just heard before, but again, as mentioned before, DME's been tasked with creating a street light criteria manual in an attempt to help unify and standardize the requirements for street lighting in the city. Originally in the Denton Development Code, there was basically one line that covered all street light requirements, and that's shown here. They should be installed at cul-de-sacs intersections and at 300-foot intervals in between. The Denton Development Code took that a little bit farther and provided the additional requirements that we've shown before. Now, as mentioned, requirements C and D of Section 7.11.6 do cause some problems for us the way lights are currently installed right now. So our acorn lights don't meet the requirement of C, and pretty much all of the lights in the city do cast some light on adjacent properties. It's just part of the physics of light, and so in order to both correct that, as well as to provide additional direction to developers and city staff as well, we have proposed these changes to the Development Code, first in Section C, that all new street lighting fixtures shall be cut off, full cut off, and as mentioned before, we're working with the City Council to select an appropriate light that will meet that requirement, and then in Paragraph D, that all other lighting requirements would be governed by a Street Light Criteria Manual. In developing that manual, we have chosen to follow a national standard, the ANSI Institute RP8, which governs street lights for roadways, as well as parking structures. It's a nationally recognized manual, and it is very well researched and put together, and so the City of Denton proposes that we apply that manual to all streets in the city and how we light them. Now that said, the manual provides guidance for how to light those streets with various lighting levels. Most of that has to be accomplished with computer software, but it does provide caveats that allow us to direct the placement in some situations where the speed limits are lower, and so taking that into account, we've provided guidance to developers on how to implement that, how to present their recommendations to the city, and also in residential developments, how they can actually place the lights and be compliant with this national standard. It provides guidance on the accepted materials and lighting standards that we have. There are a myriad of light fixtures out there. One of the challenges that we face is that we have to be able to supply and stock and maintain all of these lights, and so we've really tried to focus in on a standard that meets the city aesthetic, something that's pleasing, but also that we can feasibly manage and take care of, and so this manual addresses that and provides guidance to developers on how the interaction takes place for installations, maintenance, and so forth. And then, of course, the manual will also incorporate this new light fixture that will be selected with council's guidance. And so, again, our recommendations are simply that the changes to the development code, paragraph C and D, be accepted, and then also that the street light criteria manual itself be approved. That manual was provided as an -- what's the word -- attachment, thank you -- as an attachment to the AIS, and so should be available to all of you if you have any questions about that. And with that, I open it up for questions. >> Any questions for Aaron? Commissioner Pruitt? >> Thank you, Vice Chair. Acting. Great work. Looks great. I did have one question just on the applicability of this, or if it's a different tool that we need to look toward. I noticed that in the placement section, there's recommendations of placing, you know, on one side or the other side of the sidewalk and that sort of thing. We've had several developments in the last five-plus years where the placement of poles has either been inside the sidewalk or guy wires into the sidewalk chipped out or something like that. I'm thinking about that Fire Star or something west of Hinkle, south of North Lakes Park area. >> Park area. >> Fireside, thank you. Does this help us clean that up because the street lighting plan is kind of the first plan of where are we going to put the poles, or are those situations handled by some other process? >> So ideally, the street lighting plan is addressed during the development review process. DME has representatives in that group, and so as they're laying out their electrical, one of the things that comes up is, well, how do we serve the street lights? And so in theory, everything's in theory, right, until we -- but in theory, those discussions will have taken place during the development review process, and the developer will understand their responsibilities to provide the civil work, to lay out where the conduit will go, where the street lights will need to be. This guide helps them understand that beforehand, and we can point them to that in terms of placement requirements and where street lights are expected. And then working with DME's representative on the development review committee, they'll be able to point out, you know, DME can serve this this way, here's where our wires are at, and so it makes sense to put the lights on this side of the street. You're going to want them behind the sidewalks over here. So again, in theory, it should alleviate that moving forward. >> Okay. Thank you. >> Any other questions for Erin? >> If I could just add one thing, so to Erin's point, I mean, the team works really hard. The development assistant team as a whole works really hard to try to prevent those kind of scenarios from happening, and I think Erin can probably attest to this, but one of the challenges is sometimes things happen out in the field. You know, we try to get it all right on the plans and have the plans perfect to address all requirements, right, but sometimes there are things that happen out in the field, and so they're having to adjust accordingly. I think our team works really hard to try to minimize any conflicts between, in this case, DME's utility poles and then also any sidewalk improvements that we do, but we do our best to try to mitigate that. >> Any other questions? So essentially, materially, the criteria manual, the street lighting criteria manual is just going to assist with cleaning up and codifying a little bit more of the development and planning process for street lighting, whereas before it's been a little bit, not going to say it's been loosey goosey, but it's been a little bit case by case, and we will build the street lighting plans as we go rather than being able to give criteria for what should be in your plan, develop it around your specific property, come with it at the development meeting process, and then it won't even be an issue, we just got to tell DME where we got to connect. >> Exactly. >> Okay. Understood. All right. Seeing nothing else. Thank you, Aaron. >> Okay. >> Appreciate it. >> Thank you. >> With that, that's the conclusion of our agenda for the work session items. I will end our meeting at 6.02, and we will reconvene in council chambers at 6.30. >> Good evening, and welcome to the Planning and Zoning Commission for the City of Denton, September 27th, and my name is Tim Smith, and I will go ahead and start our meeting tonight at 6.30. With the core in present, we will begin our agenda. First item, agenda item number one, the Pledge of Allegiance, the U.S. and Texas flag. If you're able, please stand and present with me. >> I pledge allegiance to the flag of the United States of America, and to the republic for which it stands, one nation under God, indivisible, with liberty and justice for all. >> Honor the Texas flag. I pledge allegiance to thee, Texas, one state under God, one and indivisible. >> Thank you. Our second item on the agenda is PZ 23-177, the approval of the September 13th, 2023 Planning and Zoning minutes. I have a motion from Commissioner Villarreal. >> Move approval. >> Commissioner Colle? >> Second. >> With a first and a second, let's go ahead and take a vote on the board. That motion passes 5-0. Before I continue, let me go ahead and first say, let the record show that Commissioner Ellis is absent. Moving on to our next agenda item, agenda item number 3A, just number 3, the consent agenda. Do I hear a motion and a second? >> So moved. >> Commissioner Villarreal? Commissioner Colle? Or Commissioner McDade? I'm sorry. >> Second. >> With a first and a second, I hear any discussion? Okay, seeing none, we'll take a vote on the board. That motion passes 5-0. Continuing on to agenda item number 4, beginning with item 4A, FP 23-0022B is presented, Townsend Green Phase 2, Julie Wyatt. >> Good evening, Julie Wyatt, principal planner. This is FP 23-0022B, the Townsend Green Phase 2 final plat. This is a single family subdivision, it's the second phase of a project that is already under development, the first phase. It's located south of McKinney on the east side of town. Your last planning and zoning commission meeting, it was approved with a condition that a development agreement associated with a park dedication would be approved by city council. It was approved last night at their meeting and so all conditions have been cleared and staff recommends approval of this plat. I'll be happy to answer any questions. >> Thank you, Julie, I don't see any questions from -- okay. I will take a motion and/or a second. Commissioner Cole? >> Make a motion to approve. >> Commissioner Pruitt? >> Second. >> Any discussion? Seeing none, I call for a vote on the board. Motion carries 5-0. Moving on to FP 23-0016B, Riney Elementary presented by Julie Wyatt again. >> Hi. So this is a final plat for an elementary school located on the south side of Riney Road just east of Bonnie Bray. Staff recommends approval of this final plat because the plat document does meet all criteria for approval except for one condition that we are proposing that the civil plans be unconditionally approved and I will be happy to answer any questions. >> I don't see any questions, Julie. Thank you. >> Commissioner Villarreal? >> Move approval of conditions. >> Commissioner Cole? >> Second. >> With a first and a second, no discussion? Okay, let's call for a vote on the board. My motion passes 5-0. Moving on to FP 23-0024, a new visitor to our dais, Oak Vista, Julie Wyatt. Last one. This is Oak Vista. It is a final plat for this project. It's a duplex project located on the south side of McKinney west of Loop 288 between the future duchess and McKinney. They do have some things that they need to correct on the final plat in order for it to meet all those technical requirements, so staff is recommending denial. However, we have no objection to the requested extension to October 25th and I will be happy to answer any questions. >> I don't see any, Julie. Thank you. >> Thank you. >> Commissioner Villarreal. >> Move approval of the extension request to a date certain of October 25th, 2023. >> Commissioner Pruitt? >> Second. >> With a first and a second, to postpone to date certain of October 25th, 2023. Any discussion? Okay, let's call for a vote on the board. Okay, that motion passes 5-0. We want to our last item of individual consideration, FP23-0025, as presented by Mia Hines. >> Good evening, Chair, members of the commission, Mia Hines, Associate Planner. This item is a final plat for Golden Point Industrial located just west of I-35, approximately 2100 feet south of University, so just on the opposite side of Razor Ranch to orient you. At this time, the plat does not meet all of our criteria for approval, so we are recommending denial. However, we have no objection to the requested extension, which could be granted to October 25th, 2023. And with that, I'll take any questions or comments. >> I don't see any questions, Mia. Thank you. Commissioner Cole? >> I make a motion to approve the extension to October 25th, 2023. >> Commissioner Villarreal? >> Second. >> With a first and a second, a motion to continue until October 25th, 2023. Any discussion? Okay, take a vote on the board. That motion passes 5-0. Take us on to our public hearing items of the night, start with 5A DCA 23-0008. Hear a discussion and make a recommendation regarding the development code amendments regarding street lighting standards code amendment, presented by Aaron Binion. And with that, I'll open up the public hearing. >> Thank you. I'm Aaron Binion with Dent Municipal Electric Engineering Department. This evening, just wanted to provide some information regarding our recommendations for changes to the Denton Development Code. As of 2020, street lights were governed by the city code of ordinances. That was moved to the Denton Development Code. However, it was brought to our attention that some of our existing street lights do not meet the Denton Development Code as it currently stands and so DME has been tasked with remedying that situation. In particular, section 7.11.6, item C requires street light fixtures that are full cutoff and designed to direct light below a 90-degree horizontal plane extending from the lowest point of the light source. In other words, there can be no up light. Our current Cobra Head light fixtures throughout the city meet this requirement, but the Acorn style do not. DME is working with the City Council right now to select an appropriate fixture that meets the city aesthetic and also meets this requirement. But to enable us to move forward, we request that a change be made to this, which we'll address here shortly. And also, item D requires that the lights be constructed to minimize or eliminate the direct visibility of the light source so they do not cast or reflect light on adjacent property areas. Given that the lights are placed in the right of way just a few feet from adjacent properties, that's as written physically infeasible, we'll say. And so DME actually has been tasked with creating a criteria manual to direct placement and installation of the lights. And so our recommendations to these code changes are that 7.11.6C, say all new street lighting fixtures, this will allow us to move forward with the appropriate street light that's been selected with the direction of City Council, allow us to become compliant with this code. And then for section D, we would like to amend the code so that it points to this new criteria manual. This criteria manual will give direction to developers, allow them to better understand the requirements and the placements of street lights, hopefully again creating uniformity for the city and streamlining that process so that developers and the citizens better know what to expect in terms of street lights and also allowing us to meet national standards in terms of how our streets should be lit. And this slide just talks a little bit about what's contained therein. Again, mostly dividing up responsibilities and helping to guide developers on how street lights should be designed in the City of Denton. And so with that, staff recommends that the amendments be accepted and approved. Any questions? I don't see any questions there. Thank you. Thank you. I don't have any cards wishing to speak on this item, but as a public hearing, so anybody who is wishing to do so may come forward now and then you can fill out a card afterwards. Okay. Seeing none, I'll close the public hearing and move discussion or a motion to the dais. Commissioner Villarreal. I move approval of the recommendation for the following development codes. Okay. Commissioner McDade? Second. With a first and a second, do we have any discussion? Okay. Seeing none on the board, I will move us to the board for a vote. The motion carries five zero. Moving forward, I'll go on to 5B, S23-0002, Steward Apartments presented by Mia Hine, and I will open up the public hearing. Mia Hines, by the way, not Mia Hines. There's multiple Hines in this. It's a good one, huh? That was better. Than the clean up? Than that one, yeah. I gotcha. Okay. Quiet of the dais, please, thank you. All right. Mia Hines, Associate Planner. This item is a specific use permit for Steward Apartments. The site is 2.695 acres located at the southwest corner of Loop 288 and Steward Road. The current zoning is a mixed use neighborhood, which requires a maximum building height of 65 feet, but when the mixed use neighborhood district is adjacent to a single family residential zone, or land use, anything above or between 41 feet and 65 feet requires a specific use permit, and so that is why this request is before you this evening. The multifamily use is permitted by right. Again, this request is specific to the additional height within this, specific to this area. Again, Loop 288 is the roadway that borders this property to the north. It is a four lane or freeway with four travel lanes currently divided, and then Steward Road is to the east, which is a collector with two vehicular travel lanes and an eight foot wide side path on the east side adjacent to this property. Beyond this property, you have adjacent single family residential uses, and then on the opposite side of Steward Road is an existing multifamily development, which also came before this body to request a specific use permit for additional height. With this site plan, what we have are two buildings and a total of 78 multifamily dwelling units. One of the buildings is a three story building with a maximum building height of 40 feet. The building that we are mostly focused on this evening with this request at hand is a four story building with a maximum building height of 53 feet. As far as total parking for this site, the applicant is proposing 146 in compliance with our code, 12 bicycle spaces, which is, I think, I believe four more than what they would need in our code. On-site amenities include a dog park and an outdoor pool, and then off-site improvements associated with this development would be a 10 foot wide side path within Steward Road, a two way left turn lane as decided, recommended by the traffic impact analysis that was done for this site, again, within Steward Road, and then a sidewalk along loop 288 per text dots review and their standards. There was a question about the access directly onto Steward Road. I did confirm with the applicant that there is going to be a direct access from an entrance along Steward Road for both building A and B, and I wanted to point that out. It's not shown clearly. It didn't really translate between the elevations and the site plan with what was presented, but those entrances and those connections will be made. I did get an updated site plan, so that will be clearly shown with the ordinance. Gable elevation, so again, this is the building A that we are mostly focused on this evening. The code for a building of this type really refers to the building height, or measures the building height at the midpoint of the highest gable of the pitched roof, so if you look at the elevations, you'll see that the overall building height is just under 59 feet. The way we usually understand building height is just under 59 feet, but because of that gable roof, the maximum building height that they're requesting is actually 53 feet, and they can't go above that maximum building height. That just shows what I was pointing out. The applicant also did include some architectural renderings just to show basically from the adjacent neighborhood what the view of that building would look like. You can't really actually see it from the streets, the internal streets of that neighborhood due to the sort of existing tree canopy coverage, and the building is set back significantly from those existing single-family residential units as well. As far as landscaping, they are meeting all of our criteria, providing a minimum landscape coverage of 31% and a minimum tree canopy coverage of 42%. They are providing street trees along Stewart Road and Loop 288, and they are providing open space at 9%. Standing along the right-of-way, they have a continuous row of shrubs as well as a masonry and wrought iron gate in some areas that masonry is going to be used for a sort of retaining wall, and the wrought iron would be on top of that. And then as far as the compatibility buffer for the adjacent single-family residential use to the south and southwest, they are proposing a six-foot tall masonry screening wall, so a solid wall, as well as a 10-foot wide landscape buffer on the interior of the site. This is in keeping with the Denton 2040 comprehensive plan that has this as a future land use designation of neighborhood mixed use. It also helps us achieve one of our housing goals, which is meeting the needs of our residents with a diverse array of housing choice type and cost by allowing that additional height. What we are getting with this development is that density and those additional units, of course, with that level, at that level. Mitigating adverse impacts, so DDC 7.10.6 has a requirement that building heights transition, so that we aren't really looking at a residential zoning district with a maximum building height of 40 feet, and then a multi-family building, of course, setting it right back up to that, is much higher than what would be permitted within that residential district. That's pretty much described here. What you see in the red area is the 50-foot buffer, or 50-foot setback, where a building could not exceed 40 feet. Between that and the little orange area is 50 feet to 100 feet, where a building cannot exceed 55 feet, and then beyond that in the green is the maximum building height must meet what is required within the inmate district, which is 65 feet. Again, what I said earlier, between 41 feet and 65 feet, an SUP is required, and that's why this request is here before you today. We did send out the proper notices for this. We did receive one in opposition of that notice, in opposition of this request. The applicants did not hold a neighborhood meeting, and I think that question was posed. The applicant is here to speak to that, if that is still the question of the commissioner, and no responses in favor or neutral to this request. With that, staff is recommending approval. Of course, the full justification for that recommendation is provided within your backup, but again, this does meet all of our criteria for approval, and so that is our recommendation. With that, I'll take any questions or comments that you have at this time, and again, the applicant is here prepared to answer any of your questions as well. Okay. Thank you, Bian. I don't see anybody with a question to speak. I don't have a card for the applicant, but if the applicant is willing, is wanting to speak at all ... We'll get to you in a second. We'll get to public comment in a second, so no presentation from the applicant. No presentation, just to hear the answer to questions, if you have them. Okay. Commissioner Villarreal. Yes. I do have a question for the applicant. What was the reasoning to not hold that public meeting? We did have some questions come in regards to this project. You are coming into a single-family established neighborhood. I'm just curious as to why that public meeting was decided as not being necessary. If you can just state your name and address, and then you can answer the question. Work address? Yeah. Work address is fine. Nicholas Erringer, 1720 West Virginia Street in McKinney, I think. Street or Parkway, one of the two. Okay. We sent out the notices. We posted the signs. With us only getting the one in opposition, we figured we weren't going to get a whole lot of additional pushback beyond that, so we thought we kind of did adequate reach out. Do you usually host public meetings when you're proposing projects of this nature in single-family neighborhoods by chance? Not usually, unless there's a request. Gotcha. Thank you. Okay. Is there any other questions? Any other questions for Matkin? Mia, I have two questions for you myself. Thank you. Yeah. Matthew, correct? Ned. Ned. All right. Gotcha. The current zoning right now, they can currently develop multi-family in that with the height standards that currently stand. That's why it's going for an SUP. They're just trying to raise the height. Correct. Current setback for multi-family in that zoning right now is I'm assuming 10 feet, or is it 50? From the ... From the adjacent single-family residential zoning, is it 50 feet or is it 10 feet? So just structures, I'm not sure what that south or southwest setback is immediately. The building height in transition is more related to the height than the proximity. Sure. We've seen a project in the past that's similar to this, a multi-family, a budding right up next to a single-family residential. By right, they could've ... I mean, this is almost an exact carbon copy of what we had over off 35 between Buckees and the old Goodwill, requesting an SUP for a change of height. They could, by right, develop multi-family up to 10 feet setback from the neighborhood property line, but they're asking for the SUP to increase the height, to make up for topography on the land, and by doing so, they're enforcing on themselves a 100-foot buffer. What I'm wanting to know is that if this SUP was not approved tonight, could the applicant still move forward and develop a multi-family within a 10-foot setback, and then abiding by the height transitioning, which as you put it, within that 50-foot zone of the single-family residential, could be a maximum height of 40 feet. And 40 feet, if I believe correctly, equates to, I think, essentially about a two-story building, correct, usually? You can't really get three stories in 40 feet, correct? So a two-story building could be 10 feet from the backyard. So, yeah, so the MN district does have no actual minimum side yard or rear yard setback. Because of the use, there is still that landscape buffer, so you're correct. It would be 10 feet. 10 feet. Yes. OK. All right. Thank you, Mia. OK. All right. I do not have any cards. I know we have one citizen from the public who does want to speak, so if you'd like to come on up, you could fill out a card afterwards. But if you can just state your name and your address, and then you'll have four minutes to speak. Mia, you mind? You're good. I'd come down there and help you myself if I could. I'm the only protest. And I only did it because-- If you could state your name and address real quick. I'm so sorry. You're OK, Janice. Go ahead. You're OK, Janice. My name's Janice Rogers. I live at 4204 Saline Drive. On that map, I am the last house that shows. I came because I didn't know where the building was going to sit, because that's 2.6 acres. And you're showing it's going to be in the far corner where we have to turn and come down the street. There is no turn lane off of Loop 288. We're at our-- to get in and out of that area, you take your life in your hands, because even though it's got a sign posted, nobody slows down past 60, 65. My main problem was when they put in the three-story at the end of our street on Stewart, in the loop, it blocked an hour's worth of sunshine every morning. And I just like-- I can live with losing more sunshine, but I want to know if it's going to be up close to my house, but it's going to be on the far edge of it. So I have no problems if it's not up against the-- my backyard is it. And they showed me that the parking was probably going to be in front of my backyard, which is-- that's really what I was here for, because you couldn't tell by this. And I filled out the card, but I appreciate y'all, because I just didn't know where it's going to be built. And my only problem is I want to know when it comes time to build, I work from home. So if they start messing with power lines and cable lines, I'm going to lose my-- I can't work. I just need to know who to call when things get shut off or broken or, you know, cut. And we had that when they were building those apartments, and then they're usually pretty, pretty good. We only lost internet one time. I appreciate y'all. Thank you. I appreciate it. Mia, if you can get with Janice afterwards and talk to her about getting in contact for power and that kind of stuff. So great. Awesome. All right. Have any other-- anybody else wishing to speak? If so, come on down. Yep. You can fill out a card afterwards. You can grab one of the blue cards out there in the hallway and speak afterwards, but come on down to the mic and state your name and address, and then you'll have four minutes to speak. Oh, yes. My name is Alan Moreno. Wait until you get down to the mic. We broadcast this. They're at DTV, and they can't hear you. Sorry about that. You're OK. My name is Alan Moreno. I live at 705 Jupiter Drive. I am the far left house on that picture, like right there on that corner. My issue is all the same as the last person against us, as when they were doing construction and that turn going in on Stewart and connecting to Celine, there is a high traffic whenever you come in and cut across. They have been-- the other apartments that are put there, they have side parking now. And when you come in, my issue is how are they going to accommodate their side street parking, because even when you come in, it narrows that road. And my understanding from what they explained is they were going to try to expand it in some way. My question is where, because in the other side of the apartments, they haven't expanded it at all, it's still up against the street. So are they going to do something similar? Is it going to be like a copy paste over, or how is it going to affect us just in traffic and-- I work 5 o'clock in the morning, so when I leave, people are parked here. You take that corner, it's a blind corner, basically, along with, of course, the whole height issue and losing sunlight, I feel like it's going to be kind of more of an eyesore, because on that side, there's not as high of a tree line as the other developed development across the street. So I guess what I'm saying is I'm here to be another opposition. Yes. All right. Thank you very much. We'll address the question that you have about side street parking in a second, if there's no other public speakers who have any other questions for the applicant. We'll ask them all at the same time. So thank you for coming out and speaking. Thank you. If you can, just remember to fill out a card and get it over to us. So I appreciate it. OK. This is a public hearing. If there's any other way for us to speak, please come on down. Just state your name and your address, and you'll have four minutes to speak. My name is Brittany Boss. You can address it if you'd like to. Yeah, go ahead. Oh, cool. Short people problems. I'm Brittany Boss, and I live on 704 Jupiter Drive right across the street from him, and I'm in opposition of this, mostly for the traffic. It's already-- I leave at 4, compared to him moving at 5. We usually see each other sometimes. Whenever we're trying to leave-- at least, I know for me, I get caught in the traffic in the morning, because there are other early risers, we get caught in the traffic. And whenever we see cars coming in to get onto Stewart from Loop 288, they're not the best of drivers, especially not that early in the morning. And sometimes they veer into the already opposing lane. So there are times when the parked vehicles are there, and they're oncoming. We do have to slow down a little bit more, because they go at such high speeds, already curving. And I saw on the map the entrance was going to be on Stewart for the two-way left lane. And I was wondering, kind of like, why they would do that? Because already-- and just today, when I was coming home, I take Loop 288 and get onto Stewart to get onto Selene and get onto Jupiter. The people already going into the Xer stop to get into the left, but everyone else on the Loop going off that is still going at high speeds, because there's no way to really safely slow down and turn. Nobody wants to slow down. And then seeing someone already there, we can't slow down, because they're not slowing down. And we try to be as safe as possible. We're already-- I saw someone almost get hit today on my way home, because they were trying to get into the apartments, and no one was slowing down. My question is, why would the entrance be on Stewart, adding to more of the traffic stops, people getting stuck in the endless, the high traffic hours of trying to turn left or right, or to get to where they need to go? Instead of, I guess, creating a bit more of another lane entering into the apartments off Loop 288, where it's dedicated, where they can safely enter and not contribute to possible traffic jams during the high hours of traffic, like 5 o'clock, 7 in the morning. So I'm in opposition of this, solely because of the existing traffic issues I've been experiencing since the current apartments have come into play. And then seeing the addition of another possible traffic problem. OK. If I can ask you a quick question, would you reference parking along the street of Stewart? You mean along the east side, which is the side of the already existing apartment complex? Yes. They park along that street there? Are they parked along the shoulder? My understanding, I was looking at the map on Stewart, doesn't look like there's much of a shoulder there. So they just park? It's barely. It's like a hint of a shoulder. You could park there, and your rear view mirrors are right there above the line. Or if you're able to get a little closer to the curb, it's just a smidge more. I know when the construction was happening during that time, and it was raining, I did almost hit one of the vehicles there, because there was a little bit of a bump there. So that is an existing issue. Thank you. Appreciate it. This is a public hearing. Anybody who is wishing to speak may do so. OK. Seeing none, I will close the public hearing. Mia, I do have a couple of questions I'd like to address, and then if the applicant wants to address anything on public comment. Two things. Is Stewart Road wide enough, and does our parking allow for us to allow for on-street parking on Stewart Road? It doesn't look like when I look at the map that on-street parking would be allowed there. Yeah, with the construction of Quincy Road, they did stripe that shoulder or that side of the street for allow for on-street parking. It is kind of-- it's kind of reflect-- it's kind of cut off here. It's kind of reflected in the site plan that we're considering this evening that shows some of those spaces and that dedication. I will say that this-- as a part of this development, there is some additional dedication for that area of Stewart Road as well. OK. Gotcha. We can address the applicant about that in a second. Can you help us visualize on the site plan the left-- the two-way middle turn lane that you're talking about that'll be required due to the TIA? Is there a best way to visualize that? This is-- this is the best exhibit that I have for it, unfortunately, and it's-- it's-- it would be here-- I'm sorry, here in the center. You can see where my mouse is. Again, with the-- with the dedication that is being proposed as a part of this, it would be wide enough to add a-- so there-- there would be that-- that-- that area of parking that's over there to the east, then that the lane-- that one lane that would be going north on Stewart, and then there would be a center turn lane there within this area here, and then there would be the southbound lane on Stewart. So essentially, it will be re-striped to create-- well, yes, it's a middle turn lane, but it will be a buffering-- a striped buffering within there, at least for the north and southbound traffic, because that's how that's-- and that's going to go all the way to the intersection at 288. No, just-- just to the entrance to the north entrance. So that-- that will narrow back out as it gets closer to 288. So, okay. Understood. Okay. Thank you. If the applicant wants to come on down and address any-- anything about the on-street parking that was brought up during public comment. Hi, Alden. Yeah, so just to clarify a couple of things, it-- the road never narrows back down. As it gets close to loop 288, we're-- we're building the full half section. I think the entire width of our property, it does taper down towards the south side. But for the-- kind of the-- the length of our property, we're building the full section. Okay. The existing parking for the adjacent development, we are maintaining that and we'll be re-striping it. We've got the full northbound lane. We've got the center lane, which varies, and if-- if this would be helpful, I can pass out the actual-- I've only got one copy, but I can pass out the printed copy of the site plan if you want a more detailed look at it. And that center lane is, again, it varies from strike buffer to two-way left turn lanes, and then we've got the full southbound lane as well. I'm here to answer any other questions. I don't know if the eye in the-- oh, I'm looking up at God for this, but I don't know if the eye in the sky can see that, what he has laid out on the sheet, but if we could put that up on the screen, that'd be great. Lord Jesus, do you hear me? Okay. Can you-- would you mind-- I don't know if we could see-- if you want to shift it to get into view, over the felt square there. Okay. So I guess that-- well, you want me to talk and come back? Yeah. You could just point-- you could point the mic back over to yourself, and you'd be able to speak. Perfect. This better? Yep. Okay. And there, if we could get around so we could see it on there. So I guess-- oh, perfect. Never mind. I'll move over here then. But I-- hopefully that's helpful, and we can zoom in and talk about-- Can you zoom-- can we zoom in a little bit onto the road, Stuart Road, on-- on the-- on the site plan there? I wish I had my little joystick. That'd be great. There we go. Perfect. Okay. Go ahead. Well, I-- I don't have any more to add unless I'm answering any other specific questions, or if you want to talk about any areas in-- in-- specifically. So specifically where you're seeing that striped section on top of the-- the word Stuart Road, that-- that's gonna be-- that's not gonna be the turn lane, obviously, but you can see to where that-- the hatch marking over on the west side of the road there, right? That's gonna be-- that's gonna be actual landscape buffering, and then the road-- you guys will essentially be building out a section of road there, correct, to make almost-- almost make Stuart Road wider. Yes, sir. Is that my understanding? Okay. Yes, sir. Gotcha. So it'd be widening Stuart Road to a degree. I don't want to say that when traffic engineers get-- get mad at us when I say that stuff. So-- but that's essentially what's gonna happen. Yes, sir. Yeah, that's correct. Okay. Understood. Okay. Thank you. Do we have any other questions for the applicant? Okay. Seeing none. I think none. Appreciate it. Awesome. Thanks, y'all. Okay. Public hearing has been closed, so I'll move to the dais for discussion and/or motion. Commissioner Pruitt? I'll move approval as presented. Okay. Okay. With-- with staff conditions? Yes. Okay. Well, as presented to. Commissioner Cole? Second. Okay. With the first in discussion-- second, do we have any discussion? Commissioner Villarreal. Yeah. First off, thank you, staff and the applicant for what you presented today. I fully understand you can build an apartment here by right, fully respect that. However, I don't believe a four-story complex in this neighborhood makes too much sense. I believe that a lot of these questions could have been answered earlier if a public meeting was had. With that in mind, I'm going to vote no. Okay. Commissioner McDean? Thank you, Chair. I'm also in agreement with Commissioner Villarreal. My biggest concern is the traffic. Although I don't live in that area, I actually work in that area on Hay Street. So the traffic that you see every morning, I see it also. I have a big concern with the traffic, and for that reason, I'm also in opposition of this. Okay. Thank you. All right. Any other discussion? Commissioner Pruitt? Thank you, Chair. I'm sensitive to the access and traffic issues because this is another case where we're butted up against to a tech stop road and their priorities is moving people and cars as fast as possible, and our priority is trying to make a neighborhood that people enjoy living in, and those conflict. At the same time, the proposed schematic here does improve the current situation. It gives you basically 30 feet of roadway where you can miss before hitting a parked car. Right now, I think they have about 15 feet. To me, it looks like this can only be an improvement from a traffic perspective. Where does this kind of thing go, perspective? We've been talking about being reticent about large clumps of housing outside of the loop, outside of our core. This one's inside. Right? So this gives people an opportunity to move here and be able to travel through a neighborhood to get downtown or ride their bike somewhere or et cetera, and I think we need to recognize when we see projects that fulfill that vision of seeing more infill, not outside the loop, then we need to reward them with support, so thank you. While I have Hilary looking up something real quick, I just want to say a few words myself. I totally hear the neighborhood on this, and thank you very much for coming out and speaking for those who've done it for the first time, did a great job. I agree with Commissioner Pruitt that while having the multifamily there may not be what is desired, I think it's also very hard to look at this plot of land being only 2.6 acres and seeing it be really anything else other than a very small multifamily development. Having a commercial development there could be very difficult. I also don't think it'd be something that'd be necessarily useful to the neighborhood and might end up being something like a gas station or a convenience store, which I think would be less desirable to folks there because of the noise pollution and light pollution that goes along there, and with it being able to be built by right and really the only change is, yes, I agree with Commissioner Villarreal, I think the height is not the greatest, but in my opinion, if it isn't something like this, an amenable project that creates a lot of buffer with a street improvement added into it to hopefully alleviate some of the traffic issues, and I say hopefully because no one can tell the future and speak to it. I've driven down Stewart before, and that's why I was asking those questions there because I was concerned about really how much actual street parking should be happening there, but now I know there's street parking there already, so I am concerned by that as well, but with it being said, I think the project is something that makes sense in this area, so. [inaudible] Understood. Okay. Any other discussion? Okay. Seeing none, I call for a vote on the board. That motion passes three, two. Okay. Moving on, we'll move on to item 6A, Planning and Zoning Commission Project Matrix, PZ23-170, and I will throw this over to Tina Fergens. Thank you. Just close that and get that out of the way. So just a couple quick things with respect to the matrix. So staff is working on programming, and when I say staff, Haley really is carrying the lion's share on this, but is working with various teams so that we can start programming responses to the items that have been on your matrix. As you know, we've been really busy with the area plans and all of our public engagement efforts, but that's no good excuse, in my opinion. We do need to bring these items back. So you will start seeing us bringing some of these items back on your agenda, and we're coordinating with the various supporting staff who will be providing those updates to the commission. So know that that's forthcoming. You probably noticed we have vacant seat. Just wanted to thank Commissioner Anderson for his service on the Planning and Zoning Commission. Also giving council's action some items that I know you all will be interested in. We've done some amendments here to the Debt and Development Code, of which you all have seen since they were presented as zoning cases. Having preliminary plots optional, that was approved by city council. Keep in mind, we will still have some projects, like projects that are within the Hunter and Cole MPCs, because of the way their zoning ordinances are structured. The preliminary plots are still a requirement of that, but otherwise, you'll start seeing fewer preliminary plots on your agenda as a result of the amendment that we made at least to the Debt and Development Code. The agriculture and animal-related uses, I know Angie worked hard on that. Those were also approved by council, and so if you recall, that one also has what we refer to as 11 or 12 items of dangerous things that are provided for in the state statute. So we'll continue to monitor uses that would need to be addressed with that, but also once that Texas A&M AgriLife Extension Service Manual is published, then we'll make sure that we review our regulations in accordance with that to see if there's any adjustments we need to make. Animal accommodations, I know Julie worked hard on this with group homes, community homes as well. That was approved just last night at the city council, so that is a significant improvement to our Debt and Development Code, so was glad to see that that was also able to be approved. Other items that were approved also were the alternative ESA plan for Cyrene at Hickory Creek. If you recall, they were making the adjustment in order to be able to accommodate the drainage improvements associated with that project. So that takes care of those items. With respect to the area plans, great presentation by the team this evening on downtown, so I won't address that since you got a thorough update there. Southeast, we will be doing some visual preference intercept surveys for the community in late October. So we'll do a social media and flyer advertising push to let folks know of that. Those intercept surveys will likely be happening the last two weeks in October, so stay tuned for more information on that. And then also with northeast end area plan, we will be, we're working on revising our project schedule and some of the meeting dates. I know we've had some inquiries on that, so just wanted to make sure I address that here. But once we get that all solidified and confirm some of the dates, then we will start making sure that we get that information published. I know we have several residents within the community that are interested in that. That will include dates that we've identified for Planning and Zoning Commission as well as City Council, the online survey, the community open house/workshop, and then also there's a third steering committee. And then we would also have subsequent PNZ and council meetings that we can start identifying. Know that in all likelihood because of how our commission and council schedules are presenting themselves and then also some other work priorities and staff availability, we will likely have a special called meeting for the Planning and Zoning Commission. I think we're looking at possibly November 1st, but we'll definitely, once we get our dates confirmed, we'll definitely be looking for the email from Kathy. She'll get that sent out to you all so we can confirm that we've got quorum for that as well. So a few moving parts, but again, once we get some of our other dates confirmed, then we can start making things a little bit more firm and getting that information communicated out not only to you all as commissioners, but also we'll make that information available and discuss it and of course we'll communicate that out to our steering committee as well. So that's just a quick update with Northeast and otherwise, that concludes my report. So thank you. Anybody from the commission? Anything you want to add to the matrix? I want to second Tina's thoughts and say thank you to Ronnie Anderson for his service and his time. He's been greatly appreciated. So okay, with that, we'll move on to concluding items. Anything I'll add in on concluding items, myself will just be, we were asked by Ryan Cotton to say that if anybody who's listening out there is or has any desire to be filmed by DTV for setting up their Halloween decorations, they would like to have you featured on the widely viewed and watched DTV. You can contact Ryan Cotton, Ryan, ryan.cotton, c-o-t-t-e-n at cityofdenton.com to do so. So Commissioner Pruitt. Thank you, Chair. Yeah, I just wanted to give a plug to the combined city block party national night out kickoff tomorrow night, as well as they're pulling in, the city is pulling in the state of the city event that they usually do in the late winter, I don't know what seasons are here, but and really just wanted to thank staff. I think that's an excellent way to combine two events in a way that gets a broader cross section of Denton residents that love our town in proximity to some of our city departments so they can learn more about how things run. I don't know if planning staff had any influence on that, but I see it as a positive move forward that that we've learned from some of our area plans in how to do that reach out. So thank you. Okay, see nothing else. I'll go ahead and adjourn our meeting at 717. Thank you all very much.
Agenda
7 pages
City of Denton City Hall 215 E. McKinney St. Denton, Texas 76201 www.cityofdenton.com Meeting Agenda Planning and Zoning Commission Wednesday, September 27, 2023 5:00 PM Council Work Session Room & Council Chambers WORK SESSION BEGINS AT 5:00 P.M. IN THE COUNCIL WORK SESSION ROOM REGULAR MEETING BEGINS AT 6:30 P.M. IN THE COUNCIL CHAMBERS REGISTRATION GUIDELINES FOR ADDRESSING THE PLANNING AND ZONING COMMISSION Individuals may speak during a Planning and Zoning Commission meeting under one of the following categories: Comments on Agenda Items: Public comments can be given for any item considered by the Planning and Zoning Commission, EXCEPT work session reports or closed meetings. Individuals are only able to comment one time per agenda item and cannot use more than one method to comment on a single agenda item. Public comments are limited to three (3) minutes per citizen. Public Hearing Items: Individuals are limited to four (4) minutes per public hearing item. _________________________________________________________________________________ Individuals may participate by using one of the following methods: 1. In Person for Regular or Consent Agenda Items: To provide in-person comments regular or consent agenda items (excluding public hearing items), Individuals must be present at the meeting and submit a speaker card (available at the meeting location) to the Secretary prior to the item being called. 2. In Person for Public Hearing Items: For public hearing items, speaker cards are encouraged but not required. 3. eComment: The agenda is posted online at https://tx-denton.civicplus.com/242/Public-Meetings-Agendas. Once the agenda is posted, a link to make virtual comments using the eComment module will be made available next to the meeting listing on the Upcoming Events Calendar. Using eComment, Individuals may indicate support or opposition and submit a brief comment about a specific agenda item. eComments may be submitted up until the start of the meeting at whi…