1 00:00:00,000 --> 00:00:07,200 Okay, it's 9 o'clock and we have a quorum so it's called to order the May 6, 2019 Public 2 00:00:07,200 --> 00:00:08,640 Utilities Board meeting. 3 00:00:08,640 --> 00:00:13,800 The first item on the agenda is to receive a report, hold a discussion and give staff 4 00:00:13,800 --> 00:00:20,120 direction regarding the customer service fiscal year 2019-2020 operating budget. 5 00:00:20,120 --> 00:00:24,320 Good morning Madam Chair, Board, Tiffany Thompson, Director of Customer Service. 6 00:00:24,320 --> 00:00:27,460 Happy to be here this morning to go over our budget presentation. 7 00:00:27,460 --> 00:00:31,260 So customer service mission is to help serve and educate our customers. 8 00:00:31,260 --> 00:00:35,560 Last year we calculated and produced over 641,000 bills. 9 00:00:35,560 --> 00:00:41,360 We filled at 195,000 phone calls, assisted 64,000 customers in our lobby and collected 10 00:00:41,360 --> 00:00:45,920 and reconciled over $287 million worth of revenue. 11 00:00:45,920 --> 00:00:50,280 So some of our accomplishments is we did launch the Page-You-Go prepaid metering program. 12 00:00:50,280 --> 00:00:53,640 We have about 130 customers on that program right now. 13 00:00:53,640 --> 00:00:58,280 We also launched an after-interaction survey with our lobby customers coming in. 14 00:00:58,280 --> 00:01:01,680 This is in addition to the survey that we offer over the phone. 15 00:01:01,680 --> 00:01:05,720 So anytime you interact with our customer service agents, you're given an opportunity 16 00:01:05,720 --> 00:01:10,440 to answer three short questions about your interaction and then also you can get a callback 17 00:01:10,440 --> 00:01:15,280 from a supervisor if you'd like to further discuss your interaction or have some concerns. 18 00:01:15,280 --> 00:01:20,720 We've had over 24,000 surveys completed through that and the customers that are wanting a 19 00:01:20,720 --> 00:01:26,080 callback, 75% of those customers are wanting a callback to give compliments on the experience 20 00:01:26,080 --> 00:01:29,640 that they receive from the customer service representative. 21 00:01:29,640 --> 00:01:33,960 So the other 25% has been opportunities on how we can improve. 22 00:01:33,960 --> 00:01:38,320 We also conducted the study of the credit and collection processes that we brought forth 23 00:01:38,320 --> 00:01:40,640 to you in March with that. 24 00:01:40,640 --> 00:01:45,720 And then we also did an audit, a stem to stern audit in our operation, spent about 400 hours 25 00:01:45,720 --> 00:01:50,720 with the internal auditor and did some process improvements with that. 26 00:01:50,720 --> 00:01:55,240 So our goals for this year is to continue to boost the adoption with our prepaid metering 27 00:01:55,240 --> 00:01:56,240 program. 28 00:01:56,240 --> 00:02:00,920 We're also adding an additional 18 locations to be able to pay your bill that's going to 29 00:02:00,920 --> 00:02:07,080 be at our 7-11 locations and also our family tree locations that we have in here. 30 00:02:07,080 --> 00:02:12,000 And then you'll be able to pay also multiple locations nationwide. 31 00:02:12,000 --> 00:02:16,360 We're also doing a study of our call center performance metrics with Navigant as well 32 00:02:16,360 --> 00:02:20,400 to make sure that we have the right performance metrics and that we're up to best industry 33 00:02:20,400 --> 00:02:23,120 standards with our metrics as well. 34 00:02:23,120 --> 00:02:28,160 And then we're also going to have some subject matter expert representatives that can help 35 00:02:28,160 --> 00:02:33,600 our customers that have sensitive and difficult situations that they're working through. 36 00:02:33,600 --> 00:02:37,920 So not only helping them know what programs the city offers, but also the community and 37 00:02:37,920 --> 00:02:42,800 home with it, so those are some of our goals that we have this year. 38 00:02:42,800 --> 00:02:48,160 So our budget emphasis is to maximize value while containing and limiting costs. 39 00:02:48,160 --> 00:02:51,600 So we do this by focusing on our performance measures. 40 00:02:51,600 --> 00:02:55,680 So some of the ones I want to point out is obviously bad debt is one that we want to 41 00:02:55,680 --> 00:02:57,160 continue to look at. 42 00:02:57,160 --> 00:03:01,720 Over the last several years that has been decreasing, but we did make some recent policy 43 00:03:01,720 --> 00:03:06,280 changes that is impacting that slightly with this last fiscal year and we're anticipating 44 00:03:06,280 --> 00:03:09,720 that to increase a little bit more as well. 45 00:03:09,720 --> 00:03:13,560 And so we also want to make sure our self-service adoption, so our customers are able to make 46 00:03:13,560 --> 00:03:19,200 payments online without contacting us or having other options to be able to do business online. 47 00:03:19,200 --> 00:03:22,800 And then first contact resolution, making sure we're offering that complete solution 48 00:03:22,800 --> 00:03:27,200 when the customer calls in and not creating duplication of effort on our part and also 49 00:03:27,200 --> 00:03:28,600 the customer's part. 50 00:03:28,600 --> 00:03:32,080 And then average speed of answer, how quickly we answer that phone call when they come in. 51 00:03:32,080 --> 00:03:36,040 We have a goal to answer that phone call within 60 seconds or less, right now we're answering 52 00:03:36,040 --> 00:03:39,200 that in about 29 seconds. 53 00:03:39,200 --> 00:03:43,880 So the key drivers of our budget is our customer volume, the behaviors of our customers and 54 00:03:43,880 --> 00:03:45,920 then how we respond to that volume. 55 00:03:45,920 --> 00:03:50,680 So we want to make sure we're looking at ways to reduce that volume and improve efficiency 56 00:03:50,680 --> 00:03:52,560 by increasing our customer satisfaction. 57 00:03:52,560 --> 00:03:55,760 So we do that by investing in self-service options. 58 00:03:55,760 --> 00:03:59,600 About a year and a half ago we launched the new payment portal that we have. 59 00:03:59,600 --> 00:04:04,640 We have 46% of our customer base is registered and using that payment portal. 60 00:04:04,640 --> 00:04:08,520 And then also 25% of our customer base is on electronic billing. 61 00:04:08,520 --> 00:04:12,480 So that saves us about 10 to 12 cents per bill per month with the customers that go 62 00:04:12,480 --> 00:04:15,200 on that electronic billing. 63 00:04:15,200 --> 00:04:16,360 And then approve efficiency. 64 00:04:16,360 --> 00:04:20,160 So we want to continue to leverage the feedback that we're getting from the survey. 65 00:04:20,160 --> 00:04:22,880 And I'm going to talk to you just a minute about some of the things that we implemented 66 00:04:22,880 --> 00:04:27,160 based off of that feedback that we received. 67 00:04:27,160 --> 00:04:31,480 So here's some of what has happened with our cost containment strategies and also just some 68 00:04:31,480 --> 00:04:33,560 changes in our customer behavior. 69 00:04:33,560 --> 00:04:35,880 So our customer base continues to go up. 70 00:04:35,880 --> 00:04:39,640 Our lobby volume has been decreasing over the last several years and that's directly 71 00:04:39,640 --> 00:04:43,800 impacted by based off of the self-service options that we've been offering. 72 00:04:43,800 --> 00:04:48,740 And so they've either transitioned to doing it themselves or they call us over the phone. 73 00:04:48,740 --> 00:04:53,440 So we are seeing an increase in our call center volume based off of customer base increase 74 00:04:53,440 --> 00:04:56,800 and that the calls that we're getting are the more complex calls that we do need to 75 00:04:56,800 --> 00:04:58,160 hear from. 76 00:04:58,160 --> 00:05:02,460 Our average handle time has also steadily increased over the last several years. 77 00:05:02,460 --> 00:05:06,800 And this is because, again, the calls that we're handling are more complex calls. 78 00:05:06,800 --> 00:05:08,480 So signing up for service. 79 00:05:08,480 --> 00:05:11,520 If they're needing to sign up for prepaid utilities, there's a lot of education that 80 00:05:11,520 --> 00:05:12,600 goes with that. 81 00:05:12,600 --> 00:05:15,560 So again, the customers we're hearing from are the ones that we need to talk to and spend 82 00:05:15,560 --> 00:05:17,280 a little bit of time with. 83 00:05:17,280 --> 00:05:20,720 And then our average speed of answer, this demonstrates how productive we're being. 84 00:05:20,720 --> 00:05:25,560 So even though our average handle time has increased, we're being efficient with our 85 00:05:25,560 --> 00:05:29,600 resources that we have deployed for our customers. 86 00:05:29,600 --> 00:05:34,160 So some of the process improvements that we've made this year, we've developed over 300 standard 87 00:05:34,160 --> 00:05:36,760 operating procedures that we previously didn't have. 88 00:05:36,760 --> 00:05:39,600 We have them in multiple different formats and places. 89 00:05:39,600 --> 00:05:44,000 And so this last year, we really focused on getting it in one central location to be able 90 00:05:44,000 --> 00:05:49,200 to know what is the process and really a source of truth for all the processes and methods 91 00:05:49,200 --> 00:05:51,040 that we have. 92 00:05:51,040 --> 00:05:54,240 We've also added a Spanish option to our payment portal. 93 00:05:54,240 --> 00:05:59,140 This was a feedback that we got from our Spanish representatives and also from the survey results. 94 00:05:59,140 --> 00:06:03,280 So now customers that were calling in needing to do business over the phone with the Spanish 95 00:06:03,280 --> 00:06:06,760 representatives now have that capability to do that online. 96 00:06:06,760 --> 00:06:11,200 So that's one example of one of the things we implemented based off the survey feedback. 97 00:06:11,200 --> 00:06:16,080 And then we also launched a self-service transfer and disconnection capability on our payment 98 00:06:16,080 --> 00:06:17,080 portal. 99 00:06:17,080 --> 00:06:20,800 So that's another way that customers don't need to reach out to us directly. 100 00:06:20,800 --> 00:06:26,500 They can do that online at any time to disconnect or transfer their service. 101 00:06:26,500 --> 00:06:31,160 So as an internal service fund, our cost allocation is divided among the utilities and general 102 00:06:31,160 --> 00:06:33,840 government that use our services. 103 00:06:33,840 --> 00:06:38,480 So that's based off of if they're represented on a bill or we take a phone call from them, 104 00:06:38,480 --> 00:06:42,480 they get a certain portion of our budget allocation back to them. 105 00:06:42,480 --> 00:06:47,200 And so based off of that, our budget is increasing and some of the changes I wanted to note with 106 00:06:47,200 --> 00:06:50,980 that we did have a mid-year change with an additional FTE this year. 107 00:06:50,980 --> 00:06:54,240 We have some plan changes in our supplemental packages. 108 00:06:54,240 --> 00:06:58,720 It's a 1.5 CSR and then also a quality control specialist that I'm going to talk about in 109 00:06:58,720 --> 00:07:00,220 just a couple of minutes. 110 00:07:00,220 --> 00:07:06,260 And then increased funding from $125,000 to $175,000 for the plus one program. 111 00:07:06,260 --> 00:07:09,600 And that was based off some direction that we got about a month ago from the board and 112 00:07:09,600 --> 00:07:11,240 also council. 113 00:07:11,240 --> 00:07:13,440 And then some contingency preparation. 114 00:07:13,440 --> 00:07:15,840 So currently we have a contract with Elevon. 115 00:07:15,840 --> 00:07:20,100 They're our merchant services provider for our online credit and debit card payment. 116 00:07:20,100 --> 00:07:23,360 We do need to shift over to Wells Fargo Merchant Services. 117 00:07:23,360 --> 00:07:27,340 There is some changes in the way that we're going to be able to charge the 2.7 commercial 118 00:07:27,340 --> 00:07:28,800 fee with that. 119 00:07:28,800 --> 00:07:33,720 So we're going to be coming forth to you with some direction, seeking direction on some 120 00:07:33,720 --> 00:07:37,840 options in the next couple of weeks because that will have some impacts on if we're going 121 00:07:37,840 --> 00:07:43,480 to absorb certain costs for our commercial customers and also impacts our electronic 122 00:07:43,480 --> 00:07:45,040 check payments as well. 123 00:07:45,040 --> 00:07:49,400 So we're vetting out some options and bringing forth to you again to seek direction. 124 00:07:49,400 --> 00:07:53,560 But we do need to plan for worst case scenario in our budget if we needed to absorb those 125 00:07:53,560 --> 00:07:54,560 costs. 126 00:07:54,560 --> 00:08:00,020 So this $200,000 is what that impact is. 127 00:08:00,020 --> 00:08:04,720 So some of our highlights, the personal services with the increase, additional FTEs. 128 00:08:04,720 --> 00:08:08,280 This is a fully loaded budget that you're seeing right here with the supplemental packages 129 00:08:08,280 --> 00:08:09,560 included. 130 00:08:09,560 --> 00:08:14,640 We are seeing an increase in our postage and printing due to the cost of paper. 131 00:08:14,640 --> 00:08:22,000 And then our merchant services fees is included, that additional $200,000 in that operations. 132 00:08:22,000 --> 00:08:26,560 So for our position summary, we currently have 43.5 FTEs. 133 00:08:26,560 --> 00:08:30,320 Over the last several years, we have been combining and eliminating positions. 134 00:08:30,320 --> 00:08:34,200 So this is going to be the first year that we're seeking to add some additional positions 135 00:08:34,200 --> 00:08:38,080 based off of our customer base and complexity of calls that we're servicing. 136 00:08:38,080 --> 00:08:45,480 We have the 30 staff that's dedicated just to our front line customer service support. 137 00:08:45,480 --> 00:08:50,000 So for our supplemental packages, we are seeking an additional 1.5 that's a full-time and a 138 00:08:50,000 --> 00:08:54,080 part-time customer service representative, again, based off of customer base, wanting 139 00:08:54,080 --> 00:08:58,240 to make sure that we meet our service level agreements, answering that phone call, first 140 00:08:58,240 --> 00:08:59,920 contact resolution. 141 00:08:59,920 --> 00:09:04,880 And then the quality control specialist, this was a recommendation during our audit process, 142 00:09:04,880 --> 00:09:08,580 is having someone that can do quality control on all of our billing. 143 00:09:08,580 --> 00:09:12,840 We do have some processes set in place, but there isn't a dedicated person that is looking 144 00:09:12,840 --> 00:09:18,960 over rate application and additional, again, just quality control for all of our billing 145 00:09:18,960 --> 00:09:19,960 processes. 146 00:09:19,960 --> 00:09:23,320 This person would also assist with quality control for our call center and cash, just 147 00:09:23,320 --> 00:09:27,480 based off of the number of calls that we do quality assurance on. 148 00:09:27,480 --> 00:09:31,480 And then we have a six-week training program for all of our new customer service representatives 149 00:09:31,480 --> 00:09:35,440 that start with our department, and we are almost always in some type of training program. 150 00:09:35,440 --> 00:09:41,360 So this is what this person would be, how they would be spending their time with that. 151 00:09:41,360 --> 00:09:45,240 And so with that, I'd like to thank the board for their continued support, and happy to 152 00:09:45,240 --> 00:09:47,240 answer any questions. 153 00:09:47,240 --> 00:09:48,240 Questions? 154 00:09:48,240 --> 00:09:58,520 The pay near me plan, did that contract come before us? 155 00:09:58,520 --> 00:10:03,680 It did not come before you, because it's just an addition to the prepay metering contract. 156 00:10:03,680 --> 00:10:07,840 With that, we're able to do that, and there is no cost to the city to do that. 157 00:10:07,840 --> 00:10:12,160 It's going to be passed through to the customers that are utilizing it. 158 00:10:12,160 --> 00:10:14,440 So there isn't any cost to the city with it. 159 00:10:14,440 --> 00:10:18,160 But once we go live with that, we're going to be bringing forth an informal staff report 160 00:10:18,160 --> 00:10:22,680 that will be put to the PUB so you're aware of what's going on, how it works, and then 161 00:10:22,680 --> 00:10:24,000 marketing to our customers. 162 00:10:24,000 --> 00:10:28,880 Okay, so essentially, they can pay at 7-Eleven, but they have to pay the percentage fee. 163 00:10:28,880 --> 00:10:29,880 Any fee associated. 164 00:10:29,880 --> 00:10:32,440 And 27,000 other locations, that's all the same. 165 00:10:32,440 --> 00:10:35,440 It's the same thing that we have with MoneyGram and Fidelity Express. 166 00:10:35,440 --> 00:10:38,480 If you go to Kroger, same type of thing. 167 00:10:38,480 --> 00:10:43,960 We just wanted to continue to offer additional places to pay, but this also complements the 168 00:10:43,960 --> 00:10:48,480 pay as you go program, because we need real-time information to be able to get that. 169 00:10:48,480 --> 00:10:53,200 So it's important to us for our customers to be able to go and have alternate locations 170 00:10:53,200 --> 00:10:55,960 to pay, and us get that information immediately. 171 00:10:55,960 --> 00:10:57,960 Sure, sure, sure. 172 00:10:57,960 --> 00:10:59,120 One more question. 173 00:10:59,120 --> 00:11:06,440 With respect to the pay as you go program, I know those people can access their usage 174 00:11:06,440 --> 00:11:09,600 online through some kind of portal. 175 00:11:09,600 --> 00:11:13,200 When are the rest of our customers going to be able to use that? 176 00:11:13,200 --> 00:11:14,200 So we're looking at that now. 177 00:11:14,200 --> 00:11:18,280 Right now, we've been focusing on getting the prepaid customers with that, but that's 178 00:11:18,280 --> 00:11:19,280 going to be a game plan. 179 00:11:19,280 --> 00:11:22,920 I'm glad you brought that up, because we can definitely make sure that's an articulated 180 00:11:22,920 --> 00:11:26,200 goal for our post-pay customers to also be able to do that. 181 00:11:26,200 --> 00:11:31,480 So what we can do is once we're ready to implement that, we can come forward to the PUB and let 182 00:11:31,480 --> 00:11:33,960 you know this is ready to go, and here's the process to do that. 183 00:11:33,960 --> 00:11:36,920 I mean, that's something we've already budgeted for and paid for. 184 00:11:36,920 --> 00:11:37,920 Yes, sir. 185 00:11:37,920 --> 00:11:38,920 Okay. 186 00:11:38,920 --> 00:11:43,280 So as soon as we can get that online, it seems like that might be useful to everybody, especially 187 00:11:43,280 --> 00:11:44,280 if we've already paid for it. 188 00:11:44,280 --> 00:11:45,800 It's going to be sooner than later, so. 189 00:11:45,800 --> 00:11:48,480 And that'll be both electric and water? 190 00:11:48,480 --> 00:11:52,680 You have to have electric to be able to have the my usage, because that's the trigger. 191 00:11:52,680 --> 00:11:58,880 If you're a water-only customer, the data isn't there, because we're still estimating 192 00:11:58,880 --> 00:11:59,880 water usages. 193 00:11:59,880 --> 00:12:04,680 It's pulling data from the smart meters, and I don't think the water meters are smart. 194 00:12:04,680 --> 00:12:05,680 Yeah. 195 00:12:05,680 --> 00:12:06,680 Right. 196 00:12:06,680 --> 00:12:09,680 I'll let you say that, so. 197 00:12:09,680 --> 00:12:12,640 That's what you said. 198 00:12:12,640 --> 00:12:17,280 I just want to say your time to answer is an excellent -- you're doing excellent in 199 00:12:17,280 --> 00:12:18,280 that. 200 00:12:18,280 --> 00:12:19,280 Thank you. 201 00:12:19,280 --> 00:12:22,840 I think there's 43.5 people that make this happen. 202 00:12:22,840 --> 00:12:23,840 Yeah. 203 00:12:23,840 --> 00:12:25,680 I just get to be the mouthpiece. 204 00:12:25,680 --> 00:12:26,680 Yeah. 205 00:12:26,680 --> 00:12:27,680 Sorry. 206 00:12:27,680 --> 00:12:28,680 One more thing. 207 00:12:28,680 --> 00:12:29,680 Sure. 208 00:12:29,680 --> 00:12:32,160 With our merchant services agreements, you're going to bring that back to us to tell us the 209 00:12:32,160 --> 00:12:33,160 details of that? 210 00:12:33,160 --> 00:12:34,160 Yes. 211 00:12:34,160 --> 00:12:38,600 So right now, just high level, we charge a 2.7% fee on the commercial customers. 212 00:12:38,600 --> 00:12:43,440 Our contract that we need to go to with Wells Fargo Merchant Services does not support that. 213 00:12:43,440 --> 00:12:48,000 They say we need to have a flat fee, and so -- and we also would not be considered a general 214 00:12:48,000 --> 00:12:53,500 government mid, we'd be considered a utility mid, and so there's different complexities 215 00:12:53,500 --> 00:12:56,720 that go along with that, so there's going to be some costs associated. 216 00:12:56,720 --> 00:12:58,000 Do we want to absorb the fees? 217 00:12:58,000 --> 00:12:59,880 Do we want to pass on the fee? 218 00:12:59,880 --> 00:13:00,880 What should that fee be? 219 00:13:00,880 --> 00:13:01,880 It also -- 220 00:13:01,880 --> 00:13:06,000 Is there a do we even want to do business with Wells Fargo option? 221 00:13:06,000 --> 00:13:09,660 That's one of the options that I think we need to discuss is do we want to go out for 222 00:13:09,660 --> 00:13:13,080 a request for proposal for that one specific service. 223 00:13:13,080 --> 00:13:16,760 The contract that we're operating under now, which the PUB and council gave us a one-year 224 00:13:16,760 --> 00:13:22,680 extension just a couple of weeks ago, is up May of 2020, so we have to have a solution 225 00:13:22,680 --> 00:13:27,440 by that time, and that's a very aggressive goal, just to be able to do that with it. 226 00:13:27,440 --> 00:13:29,640 So we're vetting out all those options. 227 00:13:29,640 --> 00:13:32,800 It's going to be coming for you in the next couple of weeks, so we can get your direction 228 00:13:32,800 --> 00:13:35,440 on where would you like us to go with that. 229 00:13:35,440 --> 00:13:36,440 Okay. 230 00:13:36,440 --> 00:13:37,440 All right. 231 00:13:37,440 --> 00:13:38,440 Thank you. 232 00:13:38,440 --> 00:13:39,440 Any questions? 233 00:13:39,440 --> 00:13:40,440 Okay. 234 00:13:40,440 --> 00:13:41,440 All right. 235 00:13:41,440 --> 00:13:42,440 Thank you again. 236 00:13:42,440 --> 00:13:43,440 Thank you. 237 00:13:43,440 --> 00:13:44,440 All right. 238 00:13:44,440 --> 00:13:48,480 The next item is to receive a report, hold a discussion, and give staff direction regarding 239 00:13:48,480 --> 00:13:55,960 the water fiscal year 2019 and 2020 operating in capital budget. 240 00:13:55,960 --> 00:13:59,760 Okay. 241 00:13:59,760 --> 00:14:01,160 Good morning, Madam Chair, board members. 242 00:14:01,160 --> 00:14:03,920 I am Frank Pugsley, director of water utilities. 243 00:14:03,920 --> 00:14:08,680 First, just like to take a moment to recognize a few people who helped out a lot with this 244 00:14:08,680 --> 00:14:09,680 budget. 245 00:14:09,680 --> 00:14:10,920 Crystal Westbrook sitting over there. 246 00:14:10,920 --> 00:14:15,880 She put up with us and gave us a lot of options and revised the budget over and over for us, 247 00:14:15,880 --> 00:14:19,960 and you'll see what Nick Vinson is going to present after my operations piece. 248 00:14:19,960 --> 00:14:21,360 It's all come together pretty well. 249 00:14:21,360 --> 00:14:25,200 I'd also like to introduce our two superintendents in the water utility. 250 00:14:25,200 --> 00:14:26,400 We have Mr. Hector Ortiz. 251 00:14:26,400 --> 00:14:28,440 He joined the city in April. 252 00:14:28,440 --> 00:14:32,560 He is the water production superintendent, and to his left is Kent Conkle. 253 00:14:32,560 --> 00:14:34,880 He is our water and wastewater superintendent. 254 00:14:34,880 --> 00:14:37,920 He manages all the construction and maintenance crews you see around town. 255 00:14:37,920 --> 00:14:43,040 I just want to thank those guys for coming and watching today, and also I just want to 256 00:14:43,040 --> 00:14:44,680 also acknowledge Tim Fisher. 257 00:14:44,680 --> 00:14:50,680 Over the last 10 months since I've been at the city, since June, he's done a lot of mentorship 258 00:14:50,680 --> 00:14:54,000 with me, and I just will be eternally grateful for all the knowledge he's been able to give 259 00:14:54,000 --> 00:14:57,520 me, and I hope that we can continue to do a great job running the water utility like 260 00:14:57,520 --> 00:15:02,440 he's done for the past 20 plus years, so thank you, Tim. 261 00:15:02,440 --> 00:15:09,440 With that, let's get started. 262 00:15:09,440 --> 00:15:26,320 There we go. 263 00:15:26,320 --> 00:15:27,320 Goals and accomplishments. 264 00:15:27,320 --> 00:15:31,920 Over the last year, we've accomplished a lot, I think, in the organization. 265 00:15:31,920 --> 00:15:36,680 Number one on my list is back last fall around September timeframe, we began implementing 266 00:15:36,680 --> 00:15:42,320 a really detailed construction schedule for our water and wastewater construction crews. 267 00:15:42,320 --> 00:15:46,920 It's really helped our guys focus and achieve their projects on time within budget and make 268 00:15:46,920 --> 00:15:49,160 sure that we know where we're going down the road. 269 00:15:49,160 --> 00:15:54,160 We started out with just about a couple of months of planning out with other projects 270 00:15:54,160 --> 00:15:57,040 out kind of floating out there that we pick from as we go along. 271 00:15:57,040 --> 00:16:00,120 We've built that into about a two-year look ahead where we have all of our wastewater 272 00:16:00,120 --> 00:16:04,680 and water projects planned out for two years, and that has been adopted by both the streets 273 00:16:04,680 --> 00:16:08,680 department and the project management office, and that helps all three of those groups really 274 00:16:08,680 --> 00:16:13,960 work together so that we can manage our construction projects more seamlessly so that we don't 275 00:16:13,960 --> 00:16:18,100 have these long lag times between water and wastewater replacing utilities and streets 276 00:16:18,100 --> 00:16:20,280 coming out to replace the street. 277 00:16:20,280 --> 00:16:24,920 Sometimes months later, we want to bring that lag time down to weeks rather than months. 278 00:16:24,920 --> 00:16:29,320 We also updated our water distribution master plan, which is essentially our roadmap for 279 00:16:29,320 --> 00:16:35,440 where we expect our water distribution system to go in the next 10-plus years, and we also 280 00:16:35,440 --> 00:16:40,240 updated our five-year impact fee program, which is our roadmap for growth-related projects 281 00:16:40,240 --> 00:16:43,520 that we can fund with our impact fee revenue. 282 00:16:43,520 --> 00:16:49,320 We completed some critical repairs to the Lake Louisville 30-inch raw water pipeline. 283 00:16:49,320 --> 00:16:53,640 It has a parallel 27-inch pipeline that we'll get started on with an assessment and some 284 00:16:53,640 --> 00:16:56,480 repairs coming in the next couple of fiscal years. 285 00:16:56,480 --> 00:17:02,720 Our goals coming up were really just maintenance and growth-related issues at the two treatment 286 00:17:02,720 --> 00:17:07,480 plants, some upgrades for Lake Louisville, additionally adding some zebra mussel controls 287 00:17:07,480 --> 00:17:12,200 at our raw water intake structures, because both of our lakes do have zebra mussel infestations 288 00:17:12,200 --> 00:17:13,200 now. 289 00:17:13,200 --> 00:17:15,200 We need to be cognizant of controlling those. 290 00:17:15,200 --> 00:17:19,520 Ray Roberts Water Treatment Plant really hasn't had any major upgrades since it was constructed 291 00:17:19,520 --> 00:17:20,920 and brought online in 2002. 292 00:17:20,920 --> 00:17:24,160 We've done all the routine maintenance that we need to do, but now it's time to kind 293 00:17:24,160 --> 00:17:30,960 of do some heavier lifting and bring that plant back into full operating potential. 294 00:17:30,960 --> 00:17:35,480 We have several large transmission lines that are going to help us move water to the south 295 00:17:35,480 --> 00:17:39,880 and west sides of town, the north-south water transmission main along Bonnie Bray and the 296 00:17:39,880 --> 00:17:43,680 Allred and John Payne Road water transmission lines. 297 00:17:43,680 --> 00:17:48,200 We are very close to securing, I believe, our water reuse permit from the TCEQ, and 298 00:17:48,200 --> 00:17:54,040 that will get us up to 12 MGD of additional water right, claiming our wastewater effluent 299 00:17:54,040 --> 00:17:56,480 in the future. 300 00:17:56,480 --> 00:18:00,880 And we are currently working on our water distribution system asset management plan, 301 00:18:00,880 --> 00:18:06,080 and what that program is going to do is it's going to allow us to better target our water 302 00:18:06,080 --> 00:18:08,760 distribution replacement projects. 303 00:18:08,760 --> 00:18:12,160 We'll have a better risk-based scoring for those lines so that we're not just digging 304 00:18:12,160 --> 00:18:14,520 up good pipe and replacing it with new pipe. 305 00:18:14,520 --> 00:18:17,880 We want to make sure we're replacing the correct pipes and correct valves and infrastructure 306 00:18:17,880 --> 00:18:20,120 when we need to. 307 00:18:20,120 --> 00:18:25,640 That's going to help, I think, with our budget and operating expenses going forward. 308 00:18:25,640 --> 00:18:30,680 Between all of our departments, we've centralized on the City Works work order management system, 309 00:18:30,680 --> 00:18:33,840 so all of our water and wastewater field groups are now speaking the same language as far 310 00:18:33,840 --> 00:18:35,640 as work orders go. 311 00:18:35,640 --> 00:18:41,080 We went through a vehicle study to identify our less efficient heavy equipment and make 312 00:18:41,080 --> 00:18:45,560 sure we have the right equipment for the right jobs so we can be most productive and efficient. 313 00:18:45,560 --> 00:18:50,320 I mentioned the asset management program. 314 00:18:50,320 --> 00:18:52,320 Cost-containment strategies in our current budget. 315 00:18:52,320 --> 00:18:57,280 We have our current proposed budget salary savings of $500,000. 316 00:18:57,280 --> 00:19:01,680 The asset management program will again help us to reduce our capital expenditures where 317 00:19:01,680 --> 00:19:04,800 we don't need to be spending it, not that we'll reduce it overall, but we'll be putting 318 00:19:04,800 --> 00:19:07,720 our money to the best use possible. 319 00:19:07,720 --> 00:19:14,480 And this past summer, we had a really good summer for water sales, both retail and untreated 320 00:19:14,480 --> 00:19:19,840 raw water, and we were able to use that revenue to defer any bond sales this spring for the 321 00:19:19,840 --> 00:19:22,840 water utility. 322 00:19:22,840 --> 00:19:27,000 And we're currently working, as you probably have all heard, on the timing and size of 323 00:19:27,000 --> 00:19:32,320 the CIP project for our Ray Roberts water treatment plant expansion. 324 00:19:32,320 --> 00:19:35,800 As everybody's been doing, we're using a zero-based budget with our supplemental packages, which 325 00:19:35,800 --> 00:19:42,360 you'll see here shortly, and again, the heavy equipment study to help us improve our efficiency. 326 00:19:42,360 --> 00:19:45,120 Process improvements, I'm going to hit on that construction schedule a couple of times 327 00:19:45,120 --> 00:19:46,920 because it really has helped our process. 328 00:19:46,920 --> 00:19:52,040 I think we've seen a really high level of production from those crews, and I attribute 329 00:19:52,040 --> 00:19:53,240 it some to that. 330 00:19:53,240 --> 00:19:58,520 We're way ahead of our projected line replacements for this year. 331 00:19:58,520 --> 00:20:02,120 We've also started cross-training some of our staff on the various equipment that we 332 00:20:02,120 --> 00:20:04,760 have in the water and wastewater crews out in the field. 333 00:20:04,760 --> 00:20:10,280 We have various equipment from various manufacturers, and we want the staff to be comfortable switching 334 00:20:10,280 --> 00:20:14,600 between equipment so that in the event of an absence, they can see that they can take 335 00:20:14,600 --> 00:20:18,000 over when they're needed. 336 00:20:18,000 --> 00:20:21,960 We've also experimented this past year with dual-purpose crews. 337 00:20:21,960 --> 00:20:25,760 Typically, what we've done is we've had water crews and wastewater crews, and they construct 338 00:20:25,760 --> 00:20:27,760 water and wastewater respectively. 339 00:20:27,760 --> 00:20:32,080 When we have the opportunity now on certain projects, we'll have the water distribution 340 00:20:32,080 --> 00:20:35,720 crew go in and replace both water and wastewater assets on the street. 341 00:20:35,720 --> 00:20:38,240 Same thing for water or the wastewater collections crews. 342 00:20:38,240 --> 00:20:41,880 It saves us immobilization, and it saves us some time switching out crews, and it helps 343 00:20:41,880 --> 00:20:48,720 us complete some of those projects a little bit faster. 344 00:20:48,720 --> 00:20:53,560 To go over our supplemental packages, we have six ranked on here. 345 00:20:53,560 --> 00:21:00,440 Water metering maintenance, we're asking for one FTE, and that is a water meter maintenance 346 00:21:00,440 --> 00:21:01,440 mechanic. 347 00:21:01,440 --> 00:21:08,300 The water metering group has only increased in full-time employees 2.5, so they've gone 348 00:21:08,300 --> 00:21:12,200 from 16 and a half FTEs to 18 in the last 20 years. 349 00:21:12,200 --> 00:21:15,640 We have a lot more meters out in the system than we have ever before, and it's continuing 350 00:21:15,640 --> 00:21:19,560 to grow, and our replacements are continuing to grow. 351 00:21:19,560 --> 00:21:28,680 We have a water metering administration, half an FTE, and I think this is rank out of water 352 00:21:28,680 --> 00:21:29,680 metering admin. 353 00:21:29,680 --> 00:21:30,680 Yes, sorry. 354 00:21:30,680 --> 00:21:36,080 Currently, one and a half admins in the water metering group, and again, their call volume 355 00:21:36,080 --> 00:21:37,440 continues to increase. 356 00:21:37,440 --> 00:21:41,200 We're asking to take our half-time employee to a full-time employee. 357 00:21:41,200 --> 00:21:45,720 The annual call volume in the water metering group that these two ladies pick up is over 358 00:21:45,720 --> 00:21:47,440 15,500 calls a year. 359 00:21:47,440 --> 00:21:53,240 That's about 65 a day, and those can take some time, and again, the half-time admins 360 00:21:53,240 --> 00:21:57,160 also volunteer some of her time in excess of when she's supposed to be there to help 361 00:21:57,160 --> 00:22:00,560 make sure work orders are closed out on a timely basis, and we can really use her help 362 00:22:00,560 --> 00:22:02,320 full-time. 363 00:22:02,320 --> 00:22:06,480 The water production operator one is for the Lake Louisville water treatment plant. 364 00:22:06,480 --> 00:22:12,680 It's shown as a full FTE, but that initial cost is low this year because we don't plan 365 00:22:12,680 --> 00:22:16,080 to bring on that employee until later in the fiscal year. 366 00:22:16,080 --> 00:22:19,880 As part of the Lake Louisville treatment plant upgrades, we'll be installing a solids handling 367 00:22:19,880 --> 00:22:25,220 system, which uses a belt filter press to help dewater our water sludge, and that piece 368 00:22:25,220 --> 00:22:29,680 of equipment really needs a full-time employee to make sure it's running at its optimal conditions 369 00:22:29,680 --> 00:22:31,760 and make sure its uptime is high. 370 00:22:31,760 --> 00:22:35,680 So we'll need that one full-time employee starting towards the end of the fiscal year 371 00:22:35,680 --> 00:22:38,880 once that project is commissioned and brought online. 372 00:22:38,880 --> 00:22:42,280 We have a utility admin assistant one and a utility admin intern. 373 00:22:42,280 --> 00:22:44,280 These are both for sustainability. 374 00:22:44,280 --> 00:22:49,360 The sustainability group will be leaving the service center for a new facility, and at 375 00:22:49,360 --> 00:22:54,680 that facility, they won't have admin support to run payroll and do the other admin functions, 376 00:22:54,680 --> 00:23:01,080 so they will need one FTE admin there, and the utility admin intern for sustainability 377 00:23:01,080 --> 00:23:06,900 is necessary due to the work we're seeing at the Clear Creek Nature Preserve, as well 378 00:23:06,900 --> 00:23:13,040 as to handle some of the after hours outreach events that the sustainability group are kind 379 00:23:13,040 --> 00:23:17,360 of volunteering their time after hours to complete, so that intern could help us accomplish 380 00:23:17,360 --> 00:23:19,760 a lot of those tasks. 381 00:23:19,760 --> 00:23:26,840 We have two asks in the water distribution group, an HEO2 and a maintenance crew truck. 382 00:23:26,840 --> 00:23:32,240 This is going to be targeted mostly towards hydrant painting and hydrant maintenance. 383 00:23:32,240 --> 00:23:35,840 As our construction load goes up and then we have emergencies, we're pulling our maintenance 384 00:23:35,840 --> 00:23:40,680 crews into construction occasionally, and by having this extra dedicated person, we 385 00:23:40,680 --> 00:23:44,920 can really focus their attention on making sure we're getting out there and maintaining 386 00:23:44,920 --> 00:23:45,920 our fire hydrants. 387 00:23:45,920 --> 00:23:50,240 We do operate every fire hydrant in the city every year through the maintenance or the 388 00:23:50,240 --> 00:23:55,040 metering shop, and whenever they identify an issue, they will submit a work order, and 389 00:23:55,040 --> 00:24:02,600 this employee would then go out and take care of the fire hydrant maintenance issues. 390 00:24:02,600 --> 00:24:08,440 This is our projection that kind of discusses when our new treatment plant will require 391 00:24:08,440 --> 00:24:10,540 to be online. 392 00:24:10,540 --> 00:24:17,800 Right now, we're showing that this is a typo here, not construction to begin in 2023. 393 00:24:17,800 --> 00:24:24,560 This is actually designed to begin in 2023, construction would begin in 2025 about, and 394 00:24:24,560 --> 00:24:28,400 then the plant needs to be online in 2028 based on our current projections. 395 00:24:28,400 --> 00:24:33,280 I mentioned we do have a study ongoing with a consultant to help us kind of narrow this 396 00:24:33,280 --> 00:24:40,080 down, and between our two estimates, we feel confident that beginning design in 2023 and 397 00:24:40,080 --> 00:24:45,960 then construction in 2025, we'll be able to have this plant online in time to beat our 398 00:24:45,960 --> 00:24:47,960 demands. 399 00:24:47,960 --> 00:24:52,520 The three lines on the graph, the red, blue, and green, we plan our treatment capacity 400 00:24:52,520 --> 00:24:55,760 based on the dry year, because that's the one that we're really concerned with. 401 00:24:55,760 --> 00:25:01,400 If we hit a dry year and we don't have capacity, then we would have to enter our draw contingency 402 00:25:01,400 --> 00:25:06,520 measures, and all the little black dots you can see are our actual pumpage. 403 00:25:06,520 --> 00:25:10,520 In the last few years, we've been a little bit fortunate that it's been wet for the last 404 00:25:10,520 --> 00:25:15,320 three, four, five years, so our actual demand has been low, but last summer we did hit a 405 00:25:15,320 --> 00:25:17,240 near peak record in July. 406 00:25:17,240 --> 00:25:22,680 We didn't hit our peak, our maximum record, but we do expect that variability to continue 407 00:25:22,680 --> 00:25:27,000 going forward. 408 00:25:27,000 --> 00:25:33,600 And with that, I'll turn it over to Nick to handle the financial side. 409 00:25:33,600 --> 00:25:35,040 Good morning, Chair, PB members. 410 00:25:35,040 --> 00:25:37,660 As Frank said, I'm Nick Vincent, the city's budget manager. 411 00:25:37,660 --> 00:25:41,880 I'll be presenting to you the financial portion of the proposed 19-20 water budget. 412 00:25:41,880 --> 00:25:43,680 Feel free to stop me throughout these slides. 413 00:25:43,680 --> 00:25:46,600 If you have any questions, I'd be happy to answer your questions. 414 00:25:46,600 --> 00:25:50,400 A few of the assumptions that went into putting the five-year forecast together, we are proposing 415 00:25:50,400 --> 00:25:54,280 to change the way that impact fee revenue is currently used in the water fund. 416 00:25:54,280 --> 00:25:56,720 I'll review that with you on the next slide. 417 00:25:56,720 --> 00:26:01,440 We are not forecasting any rate increases for the current proposed budget in 2020, but 418 00:26:01,440 --> 00:26:06,120 we do have some plugged in in '22 and '23 in anticipation of the water treatment plant 419 00:26:06,120 --> 00:26:08,040 that Frank talked about. 420 00:26:08,040 --> 00:26:11,160 We are projecting a 2% population growth. 421 00:26:11,160 --> 00:26:17,480 We do have a declining GPCD plugged in, going down to 152 in fiscal year 2024. 422 00:26:17,480 --> 00:26:24,400 And then the water treatment plan, it has moved from 24 to 25, as Frank had mentioned. 423 00:26:24,400 --> 00:26:28,320 So as I said, we are proposing to change the way that water impact fee revenue is currently 424 00:26:28,320 --> 00:26:30,240 used in the water fund. 425 00:26:30,240 --> 00:26:35,120 When we receive this revenue currently, we do apply it to eligible debt service. 426 00:26:35,120 --> 00:26:40,000 Moving forward, we are proposing to change this method to fund both debt service and 427 00:26:40,000 --> 00:26:43,200 upfront project cost of eligible projects. 428 00:26:43,200 --> 00:26:47,800 So you can see in the proposed columns, the eligible debt service portion would be 2.7 429 00:26:47,800 --> 00:26:48,800 million. 430 00:26:48,800 --> 00:26:51,600 The revenue component would be about 3.8 million. 431 00:26:51,600 --> 00:26:56,000 Over the five-year period, we would fund about $11.2 million worth of revenue funding of 432 00:26:56,000 --> 00:26:58,040 upfront project cost. 433 00:26:58,040 --> 00:27:02,600 This does save the fund money associated with interest of issuing bonds for these projects. 434 00:27:02,600 --> 00:27:08,940 And I'll show this to you in the five-year forecast also on a few slides. 435 00:27:08,940 --> 00:27:13,200 This slide summarizes how much revenue the water fund can recover through impact fees 436 00:27:13,200 --> 00:27:15,140 over a 10-year period. 437 00:27:15,140 --> 00:27:18,720 Last fall, the impact fee study was completed for the water fund. 438 00:27:18,720 --> 00:27:24,000 It did identify $66 million in total recoverable costs that we could recoup through impact 439 00:27:24,000 --> 00:27:25,320 fees. 440 00:27:25,320 --> 00:27:27,880 When that money does come in, we can apply it to two different things. 441 00:27:27,880 --> 00:27:33,080 We can pay debt service of eligible projects, or we can cash fund projects upfront. 442 00:27:33,080 --> 00:27:37,960 Our current project list identified about $17 million worth of projects we can revenue fund 443 00:27:37,960 --> 00:27:42,920 upfront, and then about $49 million worth of debt service that we can apply towards 444 00:27:42,920 --> 00:27:44,800 the debt service component. 445 00:27:44,800 --> 00:27:49,120 So when you look at these tables on the proceeding side, you can see over five-year periods, 446 00:27:49,120 --> 00:27:54,280 about $21 million towards debt service and about $11.2 million towards revenue funding. 447 00:27:54,280 --> 00:27:57,260 So we are within those requirements. 448 00:27:57,260 --> 00:27:58,560 This is the five-year forecast. 449 00:27:58,560 --> 00:28:04,340 You can see the adopted budget, 2019 in this column, we have $45.7 million in revenue. 450 00:28:04,340 --> 00:28:08,400 We did have about a drawdown of $4.4 million in reserves. 451 00:28:08,400 --> 00:28:11,400 The end-of-year projections, we do project to come in a little bit better, only using 452 00:28:11,400 --> 00:28:13,860 about $4 million in reserves. 453 00:28:13,860 --> 00:28:19,720 In the proposed budget, we have $47.6 million in rate revenue, a drawdown of about $2.3 454 00:28:19,720 --> 00:28:21,320 million in reserves. 455 00:28:21,320 --> 00:28:26,800 So total resource is about $50 million, expenses is $50 million, and as Frank had pointed out, 456 00:28:26,800 --> 00:28:29,760 we do have supplemental packages already included in the budget. 457 00:28:29,760 --> 00:28:33,560 You can see that amount here of $304,000. 458 00:28:33,560 --> 00:28:38,160 Moving down the page, we are not forecasting any rate increases in the current fiscal year 459 00:28:38,160 --> 00:28:39,160 or in 2021. 460 00:28:39,160 --> 00:28:45,360 We do have a 2% plugged in in '22 and '23, in anticipation of the plan coming online 461 00:28:45,360 --> 00:28:46,840 in '25. 462 00:28:46,840 --> 00:28:50,640 The reserves for this fund do stay above the minimum in each of the years. 463 00:28:50,640 --> 00:28:52,980 The current year is $19.2 million. 464 00:28:52,980 --> 00:28:56,640 It does increase to $41 million in the future years. 465 00:28:56,640 --> 00:29:00,320 I also want to point out, currently, we do have an impact fee reserve. 466 00:29:00,320 --> 00:29:03,640 In that reserve, we do have about $14.8 million. 467 00:29:03,640 --> 00:29:07,400 We do want to transition about $9 million of that to a capital reserve, that will be 468 00:29:07,400 --> 00:29:10,440 used as a future date to revenue fund another eligible project. 469 00:29:10,440 --> 00:29:16,080 So I just wanted to point that out to everybody also. 470 00:29:16,080 --> 00:29:17,920 This is the revenue detail for the water fund. 471 00:29:17,920 --> 00:29:21,840 A couple things I'd like to point out, as I mentioned a couple slides ago, we do want 472 00:29:21,840 --> 00:29:25,840 to change the way that impact fee revenue is currently used in the water fund. 473 00:29:25,840 --> 00:29:29,320 You can see, in the previous years, we brought it in and applied it towards the debt service 474 00:29:29,320 --> 00:29:30,320 of eligible projects. 475 00:29:30,320 --> 00:29:35,240 Moving forward, we're wanting to divide it into two components, applying about $2.72 476 00:29:35,240 --> 00:29:40,440 to debt service and about $3.8 million towards revenue funding of eligible projects. 477 00:29:40,440 --> 00:29:44,400 As I mentioned, this does save the fund interest money from issuing bonds over the 10-year 478 00:29:44,400 --> 00:29:47,120 term. 479 00:29:47,120 --> 00:29:50,400 This is the expense detail for the water fund. 480 00:29:50,400 --> 00:29:53,760 You can see the adopted budget here in this column of $50.1 million. 481 00:29:53,760 --> 00:29:59,040 The expenses are projected to come in about what was budgeted, about $49.9 and then the 482 00:29:59,040 --> 00:30:06,840 proposed column is about $15 million, including the supplemental package of $300,000. 483 00:30:06,840 --> 00:30:08,480 This is the five-year capital plan. 484 00:30:08,480 --> 00:30:10,640 So fiscal year 2020 is the first column. 485 00:30:10,640 --> 00:30:12,480 This is the proposed budget. 486 00:30:12,480 --> 00:30:16,880 We do have $29.2 million worth of projects that are currently planned. 487 00:30:16,880 --> 00:30:22,080 Of that amount, $15.9 million is planned to be bond funded, $9.2 million is planned to 488 00:30:22,080 --> 00:30:28,040 be revenue funded, and $3.8 would be funded with impact fee revenue at the initial project 489 00:30:28,040 --> 00:30:33,040 start. 490 00:30:33,040 --> 00:30:35,760 This is the FT summary for the water department. 491 00:30:35,760 --> 00:30:37,880 Currently there's 105.5 positions. 492 00:30:37,880 --> 00:30:39,520 You can see the number here. 493 00:30:39,520 --> 00:30:43,120 The supplemental packages that Frank just reviewed with you is five positions, which 494 00:30:43,120 --> 00:30:49,680 takes the total to 110.5. 495 00:30:49,680 --> 00:30:51,360 That's all for the water presentation. 496 00:30:51,360 --> 00:30:56,600 Can we go back to the 2% in the two future years? 497 00:30:56,600 --> 00:31:02,600 I'm sure you looked at it, but what would it look like if we had just smaller beginning 498 00:31:02,600 --> 00:31:05,700 this year? 499 00:31:05,700 --> 00:31:08,320 I do have a scenario that takes us out to a 10-year period. 500 00:31:08,320 --> 00:31:13,320 We can see it through 2030, but it does have the 2% built in. 501 00:31:13,320 --> 00:31:18,240 If we lowered it to 1%, when you get out there in the 10th year -- let me pull up another 502 00:31:18,240 --> 00:31:23,800 slide really quick and I'll address your question -- hang on just a second. 503 00:31:23,800 --> 00:31:30,840 What if we started it this year with 1% and just did 1% out instead of boom boom? 504 00:31:30,840 --> 00:31:31,840 We can look at that. 505 00:31:31,840 --> 00:31:32,840 We have not. 506 00:31:32,840 --> 00:31:34,000 I haven't brought that scenario forward today. 507 00:31:34,000 --> 00:31:36,600 If that's something the PUB would like us to bring back, we can. 508 00:31:36,600 --> 00:31:38,840 We definitely have another meeting scheduled. 509 00:31:38,840 --> 00:31:40,160 Let me show you this really quick though. 510 00:31:40,160 --> 00:31:49,600 In 2020 -- I hope everybody can see this here. 511 00:31:49,600 --> 00:31:53,000 The rate increases are down here on the green line. 512 00:31:53,000 --> 00:31:55,040 You can see them right here. 513 00:31:55,040 --> 00:31:56,360 Currently it would be 0%. 514 00:31:56,360 --> 00:31:59,320 When you get on to '22 and '23, they're 2%. 515 00:31:59,320 --> 00:32:04,200 The reason we did choose 2% -- if you look at the reserve, the minimum reserve out here 516 00:32:04,200 --> 00:32:06,880 in 2031 is $20 million. 517 00:32:06,880 --> 00:32:09,480 That puts the reserve at 21.9. 518 00:32:09,480 --> 00:32:13,360 So we could do smaller increases, but this may not be above the minimum out here in the 519 00:32:13,360 --> 00:32:14,360 future years. 520 00:32:14,360 --> 00:32:15,360 Okay. 521 00:32:15,360 --> 00:32:19,040 Of course, the earlier you start, you get the compounding effect, but we just chose 522 00:32:19,040 --> 00:32:20,040 2%. 523 00:32:20,040 --> 00:32:21,040 Well, 2% isn't big. 524 00:32:21,040 --> 00:32:22,040 I was just curious. 525 00:32:22,040 --> 00:32:23,040 Thank you. 526 00:32:23,040 --> 00:32:24,840 We definitely look at it each year too. 527 00:32:24,840 --> 00:32:30,680 As we progress in '21, we come back to the '21 budget, it very well may be 2% still. 528 00:32:30,680 --> 00:32:33,720 It may be a smaller amount. 529 00:32:33,720 --> 00:32:34,720 Other questions? 530 00:32:34,720 --> 00:32:35,720 Sorry. 531 00:32:35,720 --> 00:32:36,720 I jumped in there. 532 00:32:36,720 --> 00:32:37,720 I know you always had -- no. 533 00:32:37,720 --> 00:32:38,720 Brendan doesn't have one. 534 00:32:38,720 --> 00:32:39,720 I had a question -- 535 00:32:39,720 --> 00:32:40,720 Yes, ma'am. 536 00:32:40,720 --> 00:32:41,720 -- with Frank. 537 00:32:41,720 --> 00:32:46,200 I was just curious about what you were doing for the zebra mussels. 538 00:32:46,200 --> 00:32:49,920 I'm very sad that they're down here. 539 00:32:49,920 --> 00:32:50,920 Yes. 540 00:32:50,920 --> 00:32:55,920 There -- we'll be adding some chemical addition systems at the intake structures to discourage 541 00:32:55,920 --> 00:32:57,680 growth. 542 00:32:57,680 --> 00:32:58,680 Does it work? 543 00:32:58,680 --> 00:32:59,680 Yes, it does. 544 00:32:59,680 --> 00:33:00,680 Yeah. 545 00:33:00,680 --> 00:33:01,680 Yeah. 546 00:33:01,680 --> 00:33:06,200 It provides -- it's an oxidant and a copper ion generator that will be operated in kind 547 00:33:06,200 --> 00:33:09,640 of a pulse fashion so that it discourages them from attaching. 548 00:33:09,640 --> 00:33:11,040 They'll find somewhere else to grow. 549 00:33:11,040 --> 00:33:12,040 Okay. 550 00:33:12,040 --> 00:33:14,880 Why don't you e-mail the city of Chicago because they're working on this too. 551 00:33:14,880 --> 00:33:15,880 Yeah. 552 00:33:15,880 --> 00:33:20,160 There's -- and a lot of cities in Texas are doing the exact same thing, proposing identical 553 00:33:20,160 --> 00:33:21,440 systems that we are too. 554 00:33:21,440 --> 00:33:22,440 It seems to be -- 555 00:33:22,440 --> 00:33:24,760 So it's just right at the pipe head? 556 00:33:24,760 --> 00:33:25,760 Yes. 557 00:33:25,760 --> 00:33:26,760 Yeah. 558 00:33:26,760 --> 00:33:27,760 It's right at the intake structure. 559 00:33:27,760 --> 00:33:30,480 It stops them from, you know, attaching to that intake. 560 00:33:30,480 --> 00:33:31,480 Okay. 561 00:33:31,480 --> 00:33:32,480 Good luck. 562 00:33:32,480 --> 00:33:33,480 Thank you. 563 00:33:33,480 --> 00:33:36,520 Well, no other questions. 564 00:33:36,520 --> 00:33:37,520 Thank you. 565 00:33:37,520 --> 00:33:38,520 Appreciate it. 566 00:33:38,520 --> 00:33:39,520 All right. 567 00:33:39,520 --> 00:33:43,480 Our next item is to receive a report and hold a discussion and give staff direction regarding 568 00:33:43,480 --> 00:33:49,800 the wastewater and drainage fiscal year 2019-2020 operating and capital budget. 569 00:33:49,800 --> 00:33:55,360 Good morning, Madam Chair, PV members. 570 00:33:55,360 --> 00:33:56,360 My name is Kenny Banks. 571 00:33:56,360 --> 00:33:58,080 I'm the general manager of utilities. 572 00:33:58,080 --> 00:34:02,840 I'll be handling the wastewater portion of this presentation. 573 00:34:02,840 --> 00:34:09,880 Before I start, I also want to echo the same sentiments that Frank had put out earlier, 574 00:34:09,880 --> 00:34:12,540 acknowledge Crystal, Nick, David. 575 00:34:12,540 --> 00:34:17,240 There's been a lot of work done on this budget and I really appreciate everyone's help to 576 00:34:17,240 --> 00:34:20,100 get us to the point where we're at right now. 577 00:34:20,100 --> 00:34:26,360 So in terms of our goals and accomplishments, we submitted the final, and I want to repeat 578 00:34:26,360 --> 00:34:29,320 final, annual report for the EPA administrative order. 579 00:34:29,320 --> 00:34:33,240 This has been a long, ongoing project. 580 00:34:33,240 --> 00:34:39,240 PS Aurora has been the lead on this and essentially we've been able to implement programs that 581 00:34:39,240 --> 00:34:45,200 allowed us to go through an administrative order instead of a consent decree and essentially 582 00:34:45,200 --> 00:34:52,000 has saved the utility a lot of money, plus been able to demonstrably reduce the amount 583 00:34:52,000 --> 00:34:55,260 of sanitary sewer overflows that we've had. 584 00:34:55,260 --> 00:34:59,160 We've updated the five-year impact fee, as Frank mentioned earlier, completed the 585 00:34:59,160 --> 00:35:02,440 construction of Cooper Creek Phase 1 and 2 interceptor projects. 586 00:35:02,440 --> 00:35:05,080 These are two very large projects. 587 00:35:05,080 --> 00:35:09,000 You've probably seen them at the intersection of 288 and 380. 588 00:35:09,000 --> 00:35:13,200 Some of the work that's going on there near the channel is related to this project. 589 00:35:13,200 --> 00:35:19,440 A very important interceptor project for the whole Cooper Creek Basin. 590 00:35:19,440 --> 00:35:25,360 We have bid the Hickory Creek and West Wetflow Detention Facility projects, so the Hickory 591 00:35:25,360 --> 00:35:31,720 Creek system is an approximately 3.5 million gallon storage system that is located in the 592 00:35:31,720 --> 00:35:33,680 Hickory Creek Basin. 593 00:35:33,680 --> 00:35:38,400 It will allow us to collect water at times of high flow and then feed that back in at 594 00:35:38,400 --> 00:35:39,400 times of lower flow. 595 00:35:39,400 --> 00:35:44,120 So it's just a mechanism to help us balance our system a little bit more effectively. 596 00:35:44,120 --> 00:35:49,480 The West Peak Flow Detention Facility is actually located on the Pecan Creek Wastewater Treatment 597 00:35:49,480 --> 00:35:51,760 Plant property. 598 00:35:51,760 --> 00:35:56,400 It is about a nine million gallon capacity storage system that has a 30 million gallon 599 00:35:56,400 --> 00:36:01,040 per day pumping system that allows us also to store waste and then basically move it 600 00:36:01,040 --> 00:36:02,040 into the system. 601 00:36:02,040 --> 00:36:07,040 So it's just a way of balancing out those peak flows that we see. 602 00:36:07,040 --> 00:36:13,200 We've completed the design of the sludge handling project at Pecan Creek and bid the solids 603 00:36:13,200 --> 00:36:16,080 handling equipment for procurement. 604 00:36:16,080 --> 00:36:20,600 The solids handling system at Pecan Creek is a fairly old system. 605 00:36:20,600 --> 00:36:25,400 This is a much more modern version that will help us dewater and more effectively deal 606 00:36:25,400 --> 00:36:27,080 with our sludge. 607 00:36:27,080 --> 00:36:33,160 I also want to acknowledge that we have a project that we've been working on that's 608 00:36:33,160 --> 00:36:39,560 been kind of spearheaded by PS to look at the ability of using enhanced treatment technologies 609 00:36:39,560 --> 00:36:44,720 to expand the capacity of the Pecan Creek wastewater system without actually increasing 610 00:36:44,720 --> 00:36:47,040 the footprint of that system. 611 00:36:47,040 --> 00:36:53,840 So I'll talk about that a little bit in just a few slides or just a few bullets. 612 00:36:53,840 --> 00:37:01,280 But that solids handling is a big component of that chemical feed system. 613 00:37:01,280 --> 00:37:05,060 So we kind of designed them and implemented them hand in hand. 614 00:37:05,060 --> 00:37:09,880 And then of course we updated the wastewater collection system master plan that was part 615 00:37:09,880 --> 00:37:15,920 of the overall impact fee study that we did earlier this year. 616 00:37:15,920 --> 00:37:22,320 So goals for 19-20, we want to complete the construction of the sludge handling project 617 00:37:22,320 --> 00:37:28,320 and complete construction of Hickory Creek and West Wet Flow detention facilities, bid 618 00:37:28,320 --> 00:37:32,660 and begin construction on Hickory Creek phase one and phase two interceptor projects. 619 00:37:32,660 --> 00:37:38,360 These are two very large interceptors that are in the Hickory Creek system that are going 620 00:37:38,360 --> 00:37:45,040 to help increase the capacity to convey wastewater into that area where we've got our storage 621 00:37:45,040 --> 00:37:46,120 system. 622 00:37:46,120 --> 00:37:52,920 We've also got the Hickory Creek pump station upgrade which will again allow us to just 623 00:37:52,920 --> 00:37:59,480 really modernize and enhance that whole side of the city and moving the waste through that 624 00:37:59,480 --> 00:38:01,080 system. 625 00:38:01,080 --> 00:38:07,720 We want to submit performance data to TCEQ to look at that capacity addition. 626 00:38:07,720 --> 00:38:13,860 We have to do a pilot study for the chemically enhanced primary treatment that we're looking 627 00:38:13,860 --> 00:38:20,160 at and demonstrate that that will work effectively and then we can move on to full scale. 628 00:38:20,160 --> 00:38:26,360 And then we want to also complete the construction of the Robeson wastewater diversion project. 629 00:38:26,360 --> 00:38:33,960 This came in front of you a few weeks ago and essentially what this is is it's a system 630 00:38:33,960 --> 00:38:38,160 that's going to be put in place that allows the current Robeson wastewater treatment plant 631 00:38:38,160 --> 00:38:39,160 to be taken offline. 632 00:38:39,160 --> 00:38:45,400 They've got a small batch plant there, that batch plant is going to have to be substantially 633 00:38:45,400 --> 00:38:49,700 expanded to be able to accommodate Robeson at full growth. 634 00:38:49,700 --> 00:38:54,440 So through discussions and negotiations we have come up with a deal to basically divert 635 00:38:54,440 --> 00:39:00,200 that wastewater flow from Robeson and then move it through the Hickory Creek system ultimately 636 00:39:00,200 --> 00:39:04,600 to the concrete for treatment. 637 00:39:04,600 --> 00:39:12,440 So in terms of budget emphasis on our operating expense side as we stated on water we fully 638 00:39:12,440 --> 00:39:17,160 implemented City Works through the field group to standardize our work orders. 639 00:39:17,160 --> 00:39:21,880 We've been really looking at our equipment and vehicles and identifying places where 640 00:39:21,880 --> 00:39:27,560 we can replace heavier equipment with more right size, more nimble equipment both in 641 00:39:27,560 --> 00:39:33,160 terms of equipment size and in terms of equipment type. 642 00:39:33,160 --> 00:39:37,440 Also one of the main goals that we're doing right now is phasing out a significant amount 643 00:39:37,440 --> 00:39:43,240 of our backhoe inventory and replacing it with excavators for doing linear pipe projects. 644 00:39:43,240 --> 00:39:45,520 The excavators are much more efficient. 645 00:39:45,520 --> 00:39:49,840 So that's one example of how we're trying to get smaller and more nimble machines out 646 00:39:49,840 --> 00:39:55,200 there to do a better and more efficient job. 647 00:39:55,200 --> 00:40:00,160 Basically are looking at our asset management data. 648 00:40:00,160 --> 00:40:07,240 We have an initiative that Frank spoke about a little bit on the water side about increasing 649 00:40:07,240 --> 00:40:09,160 our asset management capabilities. 650 00:40:09,160 --> 00:40:14,160 We've got a very good program for asset management in wastewater and we've been able to use that 651 00:40:14,160 --> 00:40:19,640 program to make sure that the way in which we're managing the system is efficient. 652 00:40:19,640 --> 00:40:22,760 We're not replacing pipes just because they've reached a certain age. 653 00:40:22,760 --> 00:40:30,040 We're replacing pipes because they have reached a certain level of inefficiency or degradation. 654 00:40:30,040 --> 00:40:37,000 So we're trying to get the maximum amount of time possible out of our system. 655 00:40:37,000 --> 00:40:44,920 Again, part of that is enacting infrastructure solutions to lower asset life cost and reduce 656 00:40:44,920 --> 00:40:46,560 environmental impacts. 657 00:40:46,560 --> 00:40:52,080 We continue to look at all different types of technologies, plant modeling processes, 658 00:40:52,080 --> 00:40:58,160 the chemical treatment that I mentioned earlier, our work order system, our GPS system, all 659 00:40:58,160 --> 00:41:02,520 of those things working together to help us be as efficient as possible. 660 00:41:02,520 --> 00:41:07,500 And then, of course, we've had a consistent theme under the administrative order that 661 00:41:07,500 --> 00:41:15,520 we will continue to perform proactive operations and management activities to basically improve 662 00:41:15,520 --> 00:41:20,700 our customer service by reducing those mainline service calls, sewer chokes, and sanitary 663 00:41:20,700 --> 00:41:22,320 sewer overflows. 664 00:41:22,320 --> 00:41:29,280 The overall goal there is to minimize the emergency response by maximizing our preventative 665 00:41:29,280 --> 00:41:31,920 maintenance. 666 00:41:31,920 --> 00:41:37,800 So cost containment strategies, we've got budgeted salary savings of about $400,000. 667 00:41:37,800 --> 00:41:41,440 There was a reorganization of the Beneficial Reuse Department that occurred earlier in 668 00:41:41,440 --> 00:41:50,120 this year and we've been able to save about $53,000 on an annual basis through that reorganization. 669 00:41:50,120 --> 00:41:54,360 We've reduced our revenue funded capital and FY20 by about $3 million. 670 00:41:54,360 --> 00:41:58,440 Nick will talk about this a little bit more, but it's an attempt to kind of normalize our 671 00:41:58,440 --> 00:42:02,920 capital expenditures over the five-year capital improvement plan. 672 00:42:02,920 --> 00:42:07,440 We continue to use asset management programs to improve our capital management and replacement 673 00:42:07,440 --> 00:42:09,240 scheduling. 674 00:42:09,240 --> 00:42:13,760 We enacted a feasibility study that we talked about a little earlier to get that increased 675 00:42:13,760 --> 00:42:15,840 capacity at the plant. 676 00:42:15,840 --> 00:42:22,760 And as everyone else says, we're using zero-based budgeting with supplemental packages and then 677 00:42:22,760 --> 00:42:29,160 we are, just as in water, looking at that heavy equipment and trying to right size it. 678 00:42:29,160 --> 00:42:35,320 So process improvements for '18-'19, you'll see some consistent themes overlapping with 679 00:42:35,320 --> 00:42:36,600 water. 680 00:42:36,600 --> 00:42:40,240 Water distribution and wastewater crews are looking at that dual purpose crew to be out 681 00:42:40,240 --> 00:42:44,840 there and be more efficient, not having to mobilize twice and be able to get both the 682 00:42:44,840 --> 00:42:50,360 water and wastewater side of the project taken care of by a single crew. 683 00:42:50,360 --> 00:42:55,200 We continue to use and explore trenchless technology for sewer line repairs, whether 684 00:42:55,200 --> 00:43:01,160 that's in-situ small point repairs or doing pipe bursting projects where we can basically 685 00:43:01,160 --> 00:43:05,920 replace an existing pipe by breaking that pipe apart and pulling a larger pipe through 686 00:43:05,920 --> 00:43:08,000 it or even a pipe of the same size through it. 687 00:43:08,000 --> 00:43:13,900 So it's less disruptive, it tends to be faster and it tends to be less expensive. 688 00:43:13,900 --> 00:43:19,400 We are working on emergency response plans for all lift stations and pump stations in 689 00:43:19,400 --> 00:43:20,400 the city. 690 00:43:20,400 --> 00:43:27,560 Each station is somewhat unique and so the opportunity is there to put together a station 691 00:43:27,560 --> 00:43:33,240 specific plan so that everybody understands if we have an emergency, this is what we do, 692 00:43:33,240 --> 00:43:38,800 this is how we mobilize, this is where we need to look at putting the waste, etc., etc. 693 00:43:38,800 --> 00:43:43,960 And then the collection system asset management plan is something that we are continuing to 694 00:43:43,960 --> 00:43:46,240 enhance as we move forward. 695 00:43:46,240 --> 00:43:50,360 So the future process improvement, I've already talked quite a bit about this, but this is 696 00:43:50,360 --> 00:43:57,360 basically the installing of the solids handling and the chemically enhanced primary treatment 697 00:43:57,360 --> 00:44:03,320 facilities at Pecan Creek and we're in process right now by setting that up to run it in 698 00:44:03,320 --> 00:44:09,120 test mode and see how it works and then provide that information to TCEQ. 699 00:44:09,120 --> 00:44:13,080 At that point, if everything looks good, we'll be looking for an increase of a plant capacity 700 00:44:13,080 --> 00:44:16,320 for that plant based on this technology. 701 00:44:16,320 --> 00:44:23,740 Right now, just to give you an idea, rough cost estimates, looking at the amount of expansion 702 00:44:23,740 --> 00:44:29,040 that we anticipate getting on this, which is about 5 million gallons per day of additional 703 00:44:29,040 --> 00:44:39,820 plant treatment capacity, the cost for using the CEPT system versus the building new traditional 704 00:44:39,820 --> 00:44:46,480 plant capacity, the CEPT is going to be about 20% of what we would normally pay for plant 705 00:44:46,480 --> 00:44:47,560 expansion. 706 00:44:47,560 --> 00:44:51,720 So very beneficial dollar-wise. 707 00:44:51,720 --> 00:44:57,880 In terms of the supplemental package, we've got a couple of them here. 708 00:44:57,880 --> 00:45:05,600 Basically the wastewater collections is looking at adding two FTEs or heavy equipment operator 709 00:45:05,600 --> 00:45:06,600 ones. 710 00:45:06,600 --> 00:45:14,720 Basically, right now, we have two two-person crews and one one-person crew and essentially 711 00:45:14,720 --> 00:45:20,040 what we're looking at is adding two positions to bring the one-person crew to a two-person 712 00:45:20,040 --> 00:45:25,500 crew and then to bring one of the crews that has currently got two people to three. 713 00:45:25,500 --> 00:45:32,900 It's better to have three people for confined space entry and it also gives us an opportunity 714 00:45:32,900 --> 00:45:40,060 to do a little better job from a workload standpoint and being able to have coverage 715 00:45:40,060 --> 00:45:48,200 when people are out or someone's in a training or someone is otherwise unable to be on the 716 00:45:48,200 --> 00:45:50,200 job site. 717 00:45:50,200 --> 00:45:58,120 What's more about coverage are, as Frank had mentioned, our amount of capital construction 718 00:45:58,120 --> 00:46:03,800 has continued to increase pretty dramatically and our maintenance activities are also increasing 719 00:46:03,800 --> 00:46:04,800 at the same time. 720 00:46:04,800 --> 00:46:09,360 So this is an opportunity to plug in a few of those gaps, reduce a little bit over time 721 00:46:09,360 --> 00:46:12,040 and get better coverage. 722 00:46:12,040 --> 00:46:16,140 The HEO2, right now, we have two crews. 723 00:46:16,140 --> 00:46:17,640 One of them has five members. 724 00:46:17,640 --> 00:46:19,440 One of them has six. 725 00:46:19,440 --> 00:46:25,740 The idea here is to balance out those crews with six members apiece and do it with a heavy 726 00:46:25,740 --> 00:46:31,280 equipment operator, too, which is a higher level, more skilled individual. 727 00:46:31,280 --> 00:46:34,160 Multiple pieces of equipment can be run. 728 00:46:34,160 --> 00:46:36,960 There's two main goals there. 729 00:46:36,960 --> 00:46:41,520 One is to balance out the size of the crews, which is an efficiency issue, and then the 730 00:46:41,520 --> 00:46:47,040 second is having that experienced personnel there to act as a, for lack of a better word, 731 00:46:47,040 --> 00:46:52,640 the floater position in case we need to have coverage somewhere else in the group. 732 00:46:52,640 --> 00:46:56,080 And then the flushing truck crew leader. 733 00:46:56,080 --> 00:47:04,600 Right now, the flushing truck crew is a fairly large portion of the organization and they're 734 00:47:04,600 --> 00:47:05,940 teams of two people. 735 00:47:05,940 --> 00:47:10,880 We have a total of five and they report into a field service supervisor in addition to 736 00:47:10,880 --> 00:47:16,320 three other crew leaders reporting into that field service supervisor. 737 00:47:16,320 --> 00:47:21,040 So things are spread pretty thin right now and the ability to make sure that we're documenting 738 00:47:21,040 --> 00:47:27,600 everything on the flushing crew side, to make sure that we're covering our permit requirements, 739 00:47:27,600 --> 00:47:31,760 that we're demonstrating, that we're continuing on with the activities of the administrative 740 00:47:31,760 --> 00:47:38,000 order, and then just being able to analyze all of that activity, the videos, et cetera, 741 00:47:38,000 --> 00:47:45,440 to determine better how to go out and replace our system, we're getting spread a little 742 00:47:45,440 --> 00:47:46,720 bit too thin. 743 00:47:46,720 --> 00:47:54,240 And so the idea there is to basically get a crew leader in there. 744 00:47:54,240 --> 00:48:00,720 That crew leader would be responsible for just the flushing crew section of the organization 745 00:48:00,720 --> 00:48:05,040 and then the existing crew leader would be over all those other three areas. 746 00:48:05,040 --> 00:48:06,840 It's a little confusing. 747 00:48:06,840 --> 00:48:11,920 I do have org charts if you want to see them, but yes. 748 00:48:11,920 --> 00:48:16,120 And coordinated between water and wastewater with all the heavy equipment operators, right? 749 00:48:16,120 --> 00:48:17,120 Absolutely. 750 00:48:17,120 --> 00:48:19,480 So that we, because you're trying to do this efficiency. 751 00:48:19,480 --> 00:48:20,480 Yes. 752 00:48:20,480 --> 00:48:21,480 Okay. 753 00:48:21,480 --> 00:48:22,480 Yes, yes. 754 00:48:22,480 --> 00:48:30,840 Both of those crews report to Mr. Conkle on the water and wastewater side. 755 00:48:30,840 --> 00:48:37,240 So real quickly, the plant flow versus treatment capacity graph, I know it wouldn't be a budget 756 00:48:37,240 --> 00:48:41,840 presentation if we didn't show you all these, so I didn't want to break theme. 757 00:48:41,840 --> 00:48:49,560 But we're looking at right now about 2026 time frame when we're going to get at 90% 758 00:48:49,560 --> 00:48:51,640 of capacity. 759 00:48:51,640 --> 00:48:58,520 The difference here is that now we have the ability to look at this chemically enhanced 760 00:48:58,520 --> 00:49:00,000 primary treatment. 761 00:49:00,000 --> 00:49:05,880 And so the opportunity exists here to actually go through that plant expansion, get it online 762 00:49:05,880 --> 00:49:16,840 probably easily by 2029 and basically be able to meet the expected future growth demands 763 00:49:16,840 --> 00:49:18,760 that we're looking at right now. 764 00:49:18,760 --> 00:49:25,160 So we're looking at about a 1.8% growth, that's been pretty standard for us. 765 00:49:25,160 --> 00:49:30,000 And we have noticed that our annual flows are going down a little bit, you can kind 766 00:49:30,000 --> 00:49:31,000 of see that. 767 00:49:31,000 --> 00:49:35,520 We only have a couple of years worth of data there. 768 00:49:35,520 --> 00:49:41,280 We are thinking that this could be related to some of the declining GPCD, gallons per 769 00:49:41,280 --> 00:49:45,920 capita per day that we've seen on the water side, but it's still a little bit early to 770 00:49:45,920 --> 00:49:46,920 tell. 771 00:49:46,920 --> 00:49:50,480 So we're watching that and it is a possibility as we reevaluate this every year that this 772 00:49:50,480 --> 00:49:53,680 could slide out a little bit further. 773 00:49:53,680 --> 00:49:57,120 And I believe that is the end of my portion of this. 774 00:49:57,120 --> 00:50:02,800 So any questions for me before I turn it over to Mr. Vincent? 775 00:50:02,800 --> 00:50:08,520 Okay, thank you for your time. 776 00:50:08,520 --> 00:50:12,480 Good morning Chair, PUB members, my name is Nick Vincent, the city's budget manager. 777 00:50:12,480 --> 00:50:17,280 I'll be reviewing with you the financial portion of the proposed 19-20 wastewater budget, similar 778 00:50:17,280 --> 00:50:18,280 to water. 779 00:50:18,280 --> 00:50:20,920 If you have any questions, please feel free to stop me throughout the presentation and 780 00:50:20,920 --> 00:50:22,840 I will address them. 781 00:50:22,840 --> 00:50:27,120 We are also recommended to change the way we use wastewater impact fees for this fund. 782 00:50:27,120 --> 00:50:30,240 I'll review that with you on a similar side here shortly. 783 00:50:30,240 --> 00:50:32,960 We're projecting a 2% population growth. 784 00:50:32,960 --> 00:50:38,360 And the fund does maintain a debt coverage ratio of 1.25% and a reserve fund above the 785 00:50:38,360 --> 00:50:41,760 minimum in each of the years and I'll review that with you also. 786 00:50:41,760 --> 00:50:45,520 And there are no rate increases in the 10-year forecast or five-year forecast of the wastewater 787 00:50:45,520 --> 00:50:46,520 fund. 788 00:50:46,520 --> 00:50:51,400 And I'll show that to you here shortly. 789 00:50:51,400 --> 00:50:56,400 So we are proposing to change the way the wastewater impact fees are currently used. 790 00:50:56,400 --> 00:51:00,560 In the current method, they are applied directly to eligible debt service. 791 00:51:00,560 --> 00:51:04,560 So you can see about $4.2 million is applied to debt service. 792 00:51:04,560 --> 00:51:09,280 Moving forward, we will want to apply it towards debt service and revenue funding of projects. 793 00:51:09,280 --> 00:51:14,120 So in the 2020 proposed budget, we have about $3.7 million going towards debt service and 794 00:51:14,120 --> 00:51:17,720 about $500,000 going towards revenue funding of projects. 795 00:51:17,720 --> 00:51:21,840 Over the five-year period, we would revenue fund about $1.3 million of upfront project 796 00:51:21,840 --> 00:51:29,120 cost and apply about $20 million towards debt service. 797 00:51:29,120 --> 00:51:33,520 This table summarizes the amount of impact fee revenue the wastewater fund can receive 798 00:51:33,520 --> 00:51:35,200 over a 10-year period. 799 00:51:35,200 --> 00:51:40,400 Similar to water, this was identified in the 2018 impact fee study that was recently completed. 800 00:51:40,400 --> 00:51:45,120 So you can see total, we can recover about $49 million in impact fee revenue through 801 00:51:45,120 --> 00:51:47,080 the wastewater side. 802 00:51:47,080 --> 00:51:53,000 Of that, we can apply about $19 million towards cash funding upfront project cost, and then 803 00:51:53,000 --> 00:52:01,000 we can apply about $30 million towards debt servicing of projects. 804 00:52:01,000 --> 00:52:02,000 This is the five-year forecast. 805 00:52:02,000 --> 00:52:07,040 So the 2019 adopted budget, we have $32.7 million in rate revenue. 806 00:52:07,040 --> 00:52:10,520 We were planning to use $4.7 million in reserve. 807 00:52:10,520 --> 00:52:15,180 If you recall, we did do the 5% rate reduction last year for wastewater customers. 808 00:52:15,180 --> 00:52:20,520 We are projecting to come in a little bit better using about $4.2 million in reserve, 809 00:52:20,520 --> 00:52:24,800 so about $500,000 less than the original budget anticipated. 810 00:52:24,800 --> 00:52:31,920 Moving forward into 2020, we got $36.4 million in rate revenue, you can see that number here, 811 00:52:31,920 --> 00:52:37,760 using about $1.5 million in reserves for a total resource of about $38 million. 812 00:52:37,760 --> 00:52:40,880 Expenses is also $38 million for a balanced budget. 813 00:52:40,880 --> 00:52:44,640 There are no rate increases or decreases in the current proposed budget or in the five-year 814 00:52:44,640 --> 00:52:46,480 forecast. 815 00:52:46,480 --> 00:52:49,600 As you move down the page, the reserve does stay above the minimum. 816 00:52:49,600 --> 00:52:55,640 So you can see it's $12.7 million in 2020, the minimum being 10.6. 817 00:52:55,640 --> 00:53:00,280 As you go out, it goes to 15.2, with the minimum being 10. 818 00:53:00,280 --> 00:53:02,640 I would like to point out Dr. Banks had made a comment earlier. 819 00:53:02,640 --> 00:53:07,700 We did reduce the amount of revenue-funded project money that we're setting aside. 820 00:53:07,700 --> 00:53:11,060 So you can see in 2019, it was actually $10 million. 821 00:53:11,060 --> 00:53:14,360 We have brought that down close to $7 million in the current year. 822 00:53:14,360 --> 00:53:19,760 But we are, at the same time, planning to revenue-fund that $500,000 in projects that 823 00:53:19,760 --> 00:53:22,400 I had pointed out earlier. 824 00:53:22,400 --> 00:53:28,040 I know we can deal with it in the future, but it looks like in 2023 and 2024, we could 825 00:53:28,040 --> 00:53:30,960 have a rate decrease again. 826 00:53:30,960 --> 00:53:31,960 But that's way out there. 827 00:53:31,960 --> 00:53:32,960 So let's not talk about it. 828 00:53:32,960 --> 00:53:33,960 It is. 829 00:53:33,960 --> 00:53:35,680 If you want to see the 10-year forecast, I'd be happy to pull it up for the Waste Water 830 00:53:35,680 --> 00:53:36,680 Fund also. 831 00:53:36,680 --> 00:53:56,600 When we get to that point, this will give you a better picture past that window. 832 00:53:56,600 --> 00:53:57,600 There we go. 833 00:53:57,600 --> 00:53:58,600 Now we got it. 834 00:53:58,600 --> 00:53:59,600 All right. 835 00:53:59,600 --> 00:54:00,600 So 2020. 836 00:54:00,600 --> 00:54:01,600 Let me scroll down a little bit here. 837 00:54:01,600 --> 00:54:04,440 So you're going to see the $12.7 million here. 838 00:54:04,440 --> 00:54:08,520 As you go out, it does go down some, and the majority of the reason for that is when the 839 00:54:08,520 --> 00:54:12,960 Waste Water Treatment Plan expansion comes online, the debt service does go back up. 840 00:54:12,960 --> 00:54:13,960 So to answer your question. 841 00:54:13,960 --> 00:54:14,960 Thank you. 842 00:54:14,960 --> 00:54:15,960 You answered me. 843 00:54:15,960 --> 00:54:16,960 Yeah. 844 00:54:16,960 --> 00:54:17,960 Thank you. 845 00:54:17,960 --> 00:54:18,960 All right. 846 00:54:18,960 --> 00:54:31,760 Anybody else got any questions on a five-year forecast? 847 00:54:31,760 --> 00:54:38,680 So this budget and the plan moving forward hinges on approval of, is it the cert system? 848 00:54:38,680 --> 00:54:41,680 Is that what it's called? 849 00:54:41,680 --> 00:54:49,920 But we haven't actually even implemented that test project yet, right? 850 00:54:49,920 --> 00:54:56,480 Let me ask Dr. Banks to come back up here because he's the expert on that and he can 851 00:54:56,480 --> 00:55:00,480 address it. 852 00:55:00,480 --> 00:55:01,480 You're correct. 853 00:55:01,480 --> 00:55:06,800 We haven't implemented it in full, but we've been undergoing a feasibility and modeling 854 00:55:06,800 --> 00:55:13,540 study now for a little over a year to determine that this would work in the system. 855 00:55:13,540 --> 00:55:16,880 So it's kind of a stepwise process because it involves the permit. 856 00:55:16,880 --> 00:55:20,720 You've got to first look at the feasibility of it to decide whether you want to spend 857 00:55:20,720 --> 00:55:23,680 any more money pursuing it further. 858 00:55:23,680 --> 00:55:24,680 We've done that. 859 00:55:24,680 --> 00:55:28,320 The feasibility, which involves both testing and modeling of the plant, has indicated that 860 00:55:28,320 --> 00:55:29,860 it will work. 861 00:55:29,860 --> 00:55:37,160 We then move to the next stage, which is essentially doing a test case study to demonstrate to 862 00:55:37,160 --> 00:55:43,360 the TCEQ that we can meet all of our permitting conditions by using this particular type of 863 00:55:43,360 --> 00:55:44,920 technology. 864 00:55:44,920 --> 00:55:49,480 Once we've done that, we've got to then approach the state, and the state will have to review 865 00:55:49,480 --> 00:55:56,480 to grant us the additional capacity to discharge by studying all of that information. 866 00:55:56,480 --> 00:56:04,360 Once they do that and we've got the permit in hand, we then move to full-scale implementation. 867 00:56:04,360 --> 00:56:09,200 So we've got a feasibility study that indicates that it will work. 868 00:56:09,200 --> 00:56:15,120 We're right now on an actual test case study to demonstrate it in practice, and then if 869 00:56:15,120 --> 00:56:20,120 everything turns out as anticipated, we'll then move to the next phases, which is actual 870 00:56:20,120 --> 00:56:22,760 permit modification. 871 00:56:22,760 --> 00:56:28,360 And so we don't feel like there's the need for a contingency budget to switch gears to 872 00:56:28,360 --> 00:56:32,360 actually build a plant instead of doing the chemical treatment system. 873 00:56:32,360 --> 00:56:35,000 At this point, no. 874 00:56:35,000 --> 00:56:38,880 As we move forward, things could change. 875 00:56:38,880 --> 00:56:43,280 I think it's unlikely, given the results of the feasibility study, but that's definitely 876 00:56:43,280 --> 00:56:45,240 something that we're looking at. 877 00:56:45,240 --> 00:56:48,920 Either way, we're going to have to approach the state for a permit expansion, it's just 878 00:56:48,920 --> 00:56:53,680 how do we want to do it, through a traditional system or through this CEPT. 879 00:56:53,680 --> 00:56:58,680 Right, but if we have to use a traditional system, we're seeing a significant increase 880 00:56:58,680 --> 00:57:02,880 in how much money we have to spend, and it's going to take longer, I would imagine, to 881 00:57:02,880 --> 00:57:04,400 build it and get it in place. 882 00:57:04,400 --> 00:57:05,400 That's correct. 883 00:57:05,400 --> 00:57:08,320 So it would be a scramble mode at that point, kind of. 884 00:57:08,320 --> 00:57:14,080 Yeah, I think that at this point, I mean, we are fully aware of the timeframe associated 885 00:57:14,080 --> 00:57:21,640 with it, unless something just completely unexpected happens, we anticipate that the 886 00:57:21,640 --> 00:57:26,560 testing will be done and we'll be able to apply for the permit. 887 00:57:26,560 --> 00:57:32,240 To be honest with you, I'm much more concerned about the permit getting through than I am 888 00:57:32,240 --> 00:57:37,560 in terms of the review time for the TCEQ than I am of what we're going to have to face proving 889 00:57:37,560 --> 00:57:40,480 up this concept. 890 00:57:40,480 --> 00:57:48,300 But all that being said, yeah, the fallback position is to just do standard increase, 891 00:57:48,300 --> 00:57:57,160 but keep in mind, we're required by permit to hit these analytical points at a particular 892 00:57:57,160 --> 00:57:59,840 level of plant capacity. 893 00:57:59,840 --> 00:58:07,800 So that amount of time is kind of built into it, and as a result, we shouldn't have a 894 00:58:07,800 --> 00:58:13,120 problem that if something comes up, we are looking at it every year and we will have 895 00:58:13,120 --> 00:58:18,520 a fallback contingency of just standard construction, which is what we were intending to do until 896 00:58:18,520 --> 00:58:20,760 we hit on this new technology. 897 00:58:20,760 --> 00:58:21,760 Okay. 898 00:58:21,760 --> 00:58:22,760 Thank you. 899 00:58:22,760 --> 00:58:23,760 Sure. 900 00:58:23,760 --> 00:58:24,760 All right. 901 00:58:24,760 --> 00:58:28,480 Keep moving forward here. 902 00:58:28,480 --> 00:58:30,680 This is the revenue detail for the wastewater fund. 903 00:58:30,680 --> 00:58:35,440 A couple things I'd like to point out, similar on the water presentation, you can see we were 904 00:58:35,440 --> 00:58:39,580 bringing impact fee revenue in and applying it directly to debt service. 905 00:58:39,580 --> 00:58:43,920 Moving forward, we were breaking it up into two components, applying about $3.7 million 906 00:58:43,920 --> 00:58:51,480 towards debt service and about $500,000 towards revenue-funded eligible projects upfront cost. 907 00:58:51,480 --> 00:58:53,640 This is the expense detail for the wastewater department. 908 00:58:53,640 --> 00:58:56,760 You can see expenses by department within wastewater. 909 00:58:56,760 --> 00:59:01,480 A couple of the important things on this slide, you can see us transferring out the $500,000 910 00:59:01,480 --> 00:59:05,600 in revenue to cash fund those projects, and you can see the supplemental packages that 911 00:59:05,600 --> 00:59:09,840 Dr. Banks explained a few slides ago. 912 00:59:09,840 --> 00:59:13,240 This is a five-year capital plan. 913 00:59:13,240 --> 00:59:18,920 In the five-year window, there are a total of $69.8 million in projects. 914 00:59:18,920 --> 00:59:22,880 In 2020, the proposed budget, there's 23.1. 915 00:59:22,880 --> 00:59:28,040 Of that amount, there's 15.7 million proposed to be bond-funded, 6.7 million proposed to 916 00:59:28,040 --> 00:59:33,940 be revenue-funded, and then the $500,000 for impact fee revenue-funded projects. 917 00:59:33,940 --> 00:59:38,640 This is the FTE summary for the wastewater department. 918 00:59:38,640 --> 00:59:41,160 So currently, there's 113.5 positions. 919 00:59:41,160 --> 00:59:50,700 If the four supplementals are approved, you can see those here, we get a 117.5. 920 00:59:50,700 --> 00:59:52,860 That concludes this presentation. 921 00:59:52,860 --> 00:59:54,960 Drainage is a separate presentation. 922 00:59:54,960 --> 00:59:58,240 Daniel Kramer will come up here in just a second to do drainage. 923 00:59:58,240 --> 01:00:02,320 If anybody has any more questions about wastewater, we'd be happy to address them. 924 01:00:02,320 --> 01:00:05,320 Thank you, Nick. 925 01:00:05,320 --> 01:00:11,880 Good morning, Chair, PUP members. 926 01:00:11,880 --> 01:00:18,640 Apologize, I'm a little stuffed up. 927 01:00:18,640 --> 01:00:23,200 Apparently, I caught something for my kids this weekend. 928 01:00:23,200 --> 01:00:27,360 So I'm the Deputy Director of Operations, Streets and Drainage, Department's report 929 01:00:27,360 --> 01:00:29,040 to me. 930 01:00:29,040 --> 01:00:32,800 So some of the goals and accomplishments that we've gone through with drainage this year, 931 01:00:32,800 --> 01:00:37,040 Rockwood Lane and Mistywood, we installed a neighborhood storm drain system to help with 932 01:00:37,040 --> 01:00:38,400 some of the localized flood in the area. 933 01:00:38,400 --> 01:00:41,320 It's about 1,300 linear feet of storm drain. 934 01:00:41,320 --> 01:00:46,080 Currently, right now, we're working on the McKinney Street widening project in conjunction 935 01:00:46,080 --> 01:00:47,080 with engineering. 936 01:00:47,080 --> 01:00:50,880 We're doing a section of that right now, and then we'll be going in and doing some paving 937 01:00:50,880 --> 01:00:53,840 over the top of that, coming up with that. 938 01:00:53,840 --> 01:00:54,840 Excuse me. 939 01:00:54,840 --> 01:01:00,000 Also, Hercules storm drain system is actually going to be going on later this year, as we're 940 01:01:00,000 --> 01:01:05,520 looking for a water relocation from a developer as we put in that storm drain system for that. 941 01:01:05,520 --> 01:01:10,920 Going forward for the next year, we're looking at oak tree and Choctaw storm drain improvements. 942 01:01:10,920 --> 01:01:14,640 Both of those are currently in design right now, going through our internal engineering 943 01:01:14,640 --> 01:01:17,520 department to get ready for construction. 944 01:01:17,520 --> 01:01:22,540 We're also going to complete our mapping system for the storm drainage master plan. 945 01:01:22,540 --> 01:01:27,080 Currently, right now, we're missing a few sections here and there as we go through. 946 01:01:27,080 --> 01:01:30,120 Most of it's different inlets, different pipe sizes. 947 01:01:30,120 --> 01:01:32,200 We may have the locations, but we're missing the full depth. 948 01:01:32,200 --> 01:01:35,080 We're missing the diameter and stuff, so we're going out and getting that information so 949 01:01:35,080 --> 01:01:39,160 that we can make a full storm water plan for the whole city. 950 01:01:39,160 --> 01:01:43,600 Also, our goal is to increase the storm drain inspections. 951 01:01:43,600 --> 01:01:48,640 Currently, right now, we're somewhere around 5% is what we're able to inspect. 952 01:01:48,640 --> 01:01:53,040 Most of those are some of the troubled areas we know and calls that come in. 953 01:01:53,040 --> 01:02:03,880 Our goal is to start moving more towards maintenance to be proactive instead of reactive. 954 01:02:03,880 --> 01:02:08,200 As I said, we're looking at to increase the mapping productivity for the storm water master 955 01:02:08,200 --> 01:02:09,200 plan. 956 01:02:09,200 --> 01:02:12,480 We're working very closely with engineering on that so we can get all the information 957 01:02:12,480 --> 01:02:16,400 to do our full mapping systems on those. 958 01:02:16,400 --> 01:02:24,240 Upgrade, our systems for the current FEMA flood maps, they did put out some new maps 959 01:02:24,240 --> 01:02:25,360 here recently. 960 01:02:25,360 --> 01:02:29,840 We're working with engineering also to help them out to get our rating score back off 961 01:02:29,840 --> 01:02:31,360 the extra two points. 962 01:02:31,360 --> 01:02:34,200 With all the information we have, we're looking we should be able to raise it a couple more 963 01:02:34,200 --> 01:02:37,680 points past that to help our citizens. 964 01:02:37,680 --> 01:02:41,880 Also, to maintain our existing system, reduce the amount of trash and sediment in our waterways 965 01:02:41,880 --> 01:02:46,040 and do more maintenance. 966 01:02:46,040 --> 01:02:51,720 Some of our inefficiencies that we worked on for our -- we talked last year about street 967 01:02:51,720 --> 01:02:55,160 sweepers, seeing if we needed a third one, and we were looking at that in the budget. 968 01:02:55,160 --> 01:02:57,360 Currently right now, we don't see one. 969 01:02:57,360 --> 01:03:00,320 Next probably three to five years, we probably will need another sweeper. 970 01:03:00,320 --> 01:03:07,960 What we're looking at is about 18, 19, we're doing about 850 miles per cycle on our sweepers, 971 01:03:07,960 --> 01:03:12,280 and that's about eight and a half cycles per year for the average residential area, and 972 01:03:12,280 --> 01:03:19,160 24 cycles on our north and south thoroughfares and downtown is what we try to run on those. 973 01:03:19,160 --> 01:03:22,160 We've upped that to about 870 with the new development and looking at more efficient 974 01:03:22,160 --> 01:03:26,880 ways to run it, so that adds about 300 miles, 600 curved miles of sweeping that we've been 975 01:03:26,880 --> 01:03:31,720 able to add with very minimal on there. 976 01:03:31,720 --> 01:03:34,700 We're also working on our 24-hour response time. 977 01:03:34,700 --> 01:03:39,520 This last week or so with all the rain, we've had quite a bit more calls that come in as 978 01:03:39,520 --> 01:03:43,760 normal, but we do try to get out there 24 to 48 hours to talk with the residents to 979 01:03:43,760 --> 01:03:47,880 look at the area and see what we can do to help address their issues as they come up. 980 01:03:47,880 --> 01:03:52,760 A couple different ones, we do a lot of mowing of our channels. 981 01:03:52,760 --> 01:03:56,220 We are better situated for the big mowing of the channels. 982 01:03:56,220 --> 01:03:58,640 We have a couple small areas that we take care of. 983 01:03:58,640 --> 01:04:02,720 Currently CIS uses a small mowing contract, so we're working with them to try to get some 984 01:04:02,720 --> 01:04:06,360 of the smaller areas on there so we don't have to use our forces to do that so we can 985 01:04:06,360 --> 01:04:09,840 more efficiently work on some of the bigger ones. 986 01:04:09,840 --> 01:04:14,160 We've also been working on our inlet inspections. 987 01:04:14,160 --> 01:04:18,760 As we go out and do cleanings and everything as they come up, we got reports that are coming 988 01:04:18,760 --> 01:04:23,360 out telling us exactly what information is missing and from all of it so that we can 989 01:04:23,360 --> 01:04:26,760 actually see it on the iPads and the guys can go out there and log it into our system 990 01:04:26,760 --> 01:04:30,180 so we know all the information of every inlet we have. 991 01:04:30,180 --> 01:04:33,920 Last year we did ask for a half a person increase. 992 01:04:33,920 --> 01:04:39,640 We had a seasonal person, we added another half FTE and took one of our actually interns 993 01:04:39,640 --> 01:04:43,860 who had been working at the city and they're our full time GIS analysts right now making 994 01:04:43,860 --> 01:04:47,280 sure all of our information is up to date in our system and getting everything in there 995 01:04:47,280 --> 01:04:55,120 so we can track it more efficiently. 996 01:04:55,120 --> 01:05:00,480 As we're moving forward, we've been working for the standardization of all of our work 997 01:05:00,480 --> 01:05:02,680 orders and everything we go across the board. 998 01:05:02,680 --> 01:05:08,680 We use internally for street strainage and traffic, we use a system called Cartograph. 999 01:05:08,680 --> 01:05:11,200 We're putting all of our work orders and all of our systems in there so we can plan out 1000 01:05:11,200 --> 01:05:16,680 our work going ahead so that we can actually see it and everything in there. 1001 01:05:16,680 --> 01:05:21,320 Making sure that all the groups have the correct equipment so that they can log them in the 1002 01:05:21,320 --> 01:05:25,580 fields and we're not doing double work as they come back in and get them back into the 1003 01:05:25,580 --> 01:05:26,580 system. 1004 01:05:26,580 --> 01:05:33,360 For future use, we're working right now on use of an aerial impervious surface mapping. 1005 01:05:33,360 --> 01:05:36,880 Currently right now when any of these new businesses come up, we take the plats, we 1006 01:05:36,880 --> 01:05:40,400 see how much they have so we can estimate their drainage fee. 1007 01:05:40,400 --> 01:05:44,480 So what this system does is they fly over, use LIDAR and they can actually send back 1008 01:05:44,480 --> 01:05:45,480 a report. 1009 01:05:45,480 --> 01:05:50,720 We're looking at a pilot program over towards the Rager Ranch area to see what we're missing, 1010 01:05:50,720 --> 01:05:54,080 what it shows that it's coming up and then we will look at the data there and see if 1011 01:05:54,080 --> 01:05:58,340 it's worth doing it across the whole city on that. 1012 01:05:58,340 --> 01:06:02,080 So with one of our supplementals we are looking at, and I'll get to that here in the next 1013 01:06:02,080 --> 01:06:06,480 slide, so we're looking at 100% inspection of our channels and ditches. 1014 01:06:06,480 --> 01:06:12,000 Currently we're only at about 20% and also bringing our current inlet inspection up from 1015 01:06:12,000 --> 01:06:16,500 20% which we are currently 5%. 1016 01:06:16,500 --> 01:06:22,920 So what we're asking for in a supplemental package is one crew with 4 FTEs and one vehicle. 1017 01:06:22,920 --> 01:06:27,440 What this crew's main goal is is to get the rest of our mapping up and they'll be our 1018 01:06:27,440 --> 01:06:28,440 inspection crews. 1019 01:06:28,440 --> 01:06:31,360 We'll be able to get out there and get all the inlets inspected, do any maintenance that 1020 01:06:31,360 --> 01:06:37,360 needs to be done on those as it comes up and also for all of our ditches. 1021 01:06:37,360 --> 01:06:42,200 I wanted to just show you this, kind of our numbers and what we're looking at. 1022 01:06:42,200 --> 01:06:51,520 So right now we have 154, almost 155 miles of drainage ditch right now. 1023 01:06:51,520 --> 01:06:57,920 We hit roughly 30, 31 miles, those are all of our concrete channels and all of our small 1024 01:06:57,920 --> 01:07:00,520 ditches that we know we have issues with, the ones that we mow and they're out there 1025 01:07:00,520 --> 01:07:04,000 all the time, that's what we hit on a yearly basis. 1026 01:07:04,000 --> 01:07:09,720 Our goal would be to get up to 100%, that's an extra 124 miles of actually most of our 1027 01:07:09,720 --> 01:07:10,720 bar ditches. 1028 01:07:10,720 --> 01:07:14,640 Now not everyone needs to be maintained every year, but we do need to lay eyes on it and 1029 01:07:14,640 --> 01:07:17,800 verify that the culverts are clear and all the water when we do have these rain events 1030 01:07:17,800 --> 01:07:22,320 that it's actually draining where it's supposed to be and be able to look at them yearly. 1031 01:07:22,320 --> 01:07:27,960 As for our curb inlet inspection, currently we have 7,800 inlets, we're roughly doing 1032 01:07:27,960 --> 01:07:33,520 about 390 and as those come up, one of the issues that we had this past year was Welp 1033 01:07:33,520 --> 01:07:34,520 Street. 1034 01:07:34,520 --> 01:07:38,000 If you know, we had to take that street down and replace the culvert underneath. 1035 01:07:38,000 --> 01:07:40,920 One of those, the only reason that we found that is because a truck made the corner and 1036 01:07:40,920 --> 01:07:44,560 broke the inlet so we had to go out there and look at it and looking up underneath we 1037 01:07:44,560 --> 01:07:48,160 did see that there were some cracks and that we needed to shut that down and get to it. 1038 01:07:48,160 --> 01:07:52,120 So with this, this will allow us to hit everything within 5 years and be able to go through our 1039 01:07:52,120 --> 01:07:57,320 whole system and actually know what we need to do and make better plans going forward. 1040 01:07:57,320 --> 01:08:03,600 So, any questions on that before I hand it over to Nick? 1041 01:08:03,600 --> 01:08:05,640 Questions? 1042 01:08:05,640 --> 01:08:09,320 Thank you. 1043 01:08:09,320 --> 01:08:10,320 Thank you. 1044 01:08:10,320 --> 01:08:14,000 Good morning Chair, PB members, my name is Nick Vinson, the City's Budget Manager. 1045 01:08:14,000 --> 01:08:19,320 I'll be reviewing with you the financial portion of the proposed 19-20 drainage budget. 1046 01:08:19,320 --> 01:08:21,840 Feel free to stop me if you have any questions throughout the presentation, I'd be happy 1047 01:08:21,840 --> 01:08:23,280 to address them. 1048 01:08:23,280 --> 01:08:27,960 The proposed budget does maintain existing drainage fees or rates. 1049 01:08:27,960 --> 01:08:33,480 The drainage fee is calculated based off the square feet of impermeable surface and then 1050 01:08:33,480 --> 01:08:37,720 also the fund does maintain a fund balance of $1 million each of the five-year forecast 1051 01:08:37,720 --> 01:08:40,120 and I'll show that to you here shortly. 1052 01:08:40,120 --> 01:08:43,640 And ultimately the drainage budget does include watershed department. 1053 01:08:43,640 --> 01:08:47,080 Both of those departments ultimately roll up into the wastewater fund so we are presented 1054 01:08:47,080 --> 01:08:52,280 to you separate today but ultimately it's part of the wastewater department. 1055 01:08:52,280 --> 01:08:53,540 This is the five-year forecast. 1056 01:08:53,540 --> 01:08:58,040 You can see the adopted budget in this column here so we have about $5 million in adopted 1057 01:08:58,040 --> 01:08:59,040 revenues. 1058 01:08:59,040 --> 01:09:01,640 Same thing in expenses, they had a balanced budget. 1059 01:09:01,640 --> 01:09:07,000 In the proposed column we have revenues increased to $5.2 million based on new development. 1060 01:09:07,000 --> 01:09:10,000 Expenses are $5.2 million also. 1061 01:09:10,000 --> 01:09:14,000 As I'd said, we're proposing no rate increases to drainage fees so it's staying flat in 1062 01:09:14,000 --> 01:09:18,440 the five-year forecast and the drainage reserve is maintained in a million dollars in each 1063 01:09:18,440 --> 01:09:21,440 of the years. 1064 01:09:21,440 --> 01:09:26,120 This is the revenue detail for the drainage department. 1065 01:09:26,120 --> 01:09:29,640 So in the proposed 20-20 budget column you can see we have a little bit of transfers 1066 01:09:29,640 --> 01:09:32,080 in about $340,000 from the general fund. 1067 01:09:32,080 --> 01:09:36,760 We have about $4.8 million in drainage fees, these are residential and non-residential 1068 01:09:36,760 --> 01:09:37,760 fees. 1069 01:09:37,760 --> 01:09:45,840 And a little bit of auction proceeds for a total of $5.2 million. 1070 01:09:45,840 --> 01:09:50,280 This is the expense detail for, sorry there's a typo right here, this is actually expenses. 1071 01:09:50,280 --> 01:09:52,320 This is the expense detail for the drainage department. 1072 01:09:52,320 --> 01:09:56,200 You can see the proposed 20-20 budget column to the far right. 1073 01:09:56,200 --> 01:09:59,920 One of the things I wanted to point out is the supplemental package that Daniel did touch 1074 01:09:59,920 --> 01:10:02,320 on is included in the proposed budget. 1075 01:10:02,320 --> 01:10:03,560 It's $300,000. 1076 01:10:03,560 --> 01:10:05,880 You can see that amount listed here. 1077 01:10:05,880 --> 01:10:08,680 So total expenses of $5.2 million. 1078 01:10:08,680 --> 01:10:14,080 They do have a balanced budget this year. 1079 01:10:14,080 --> 01:10:16,200 This is the drainage five-year capital plan. 1080 01:10:16,200 --> 01:10:20,680 You can see in the five-year period there is about a million dollars in projects or 1081 01:10:20,680 --> 01:10:22,920 excuse me that's 20-24 is a million. 1082 01:10:22,920 --> 01:10:29,400 In 2020 the proposed budget column is about $630,000 in projects planned, $385,000 goes 1083 01:10:29,400 --> 01:10:34,640 to our channels rehab, $100,000 towards Choctaw drainage and a little bit of vehicle replacement 1084 01:10:34,640 --> 01:10:40,920 money in there. 1085 01:10:40,920 --> 01:10:44,080 This is the FT summary for the drainage department. 1086 01:10:44,080 --> 01:10:47,200 Currently there is 24 positions, you can see the number out here. 1087 01:10:47,200 --> 01:10:52,720 If the supplementals are approved, the four people, it would take the total to 28 positions. 1088 01:10:52,720 --> 01:10:58,520 That wraps up the drainage presentation. 1089 01:10:58,520 --> 01:11:02,520 Questions? 1090 01:11:02,520 --> 01:11:05,520 Thank you. 1091 01:11:05,520 --> 01:11:08,400 All right. 1092 01:11:08,400 --> 01:11:11,160 Next is the consent agenda. 1093 01:11:11,160 --> 01:11:16,920 Does any board member wish to pull an item off of the consent agenda? 1094 01:11:16,920 --> 01:11:21,040 Pull item B as in boy. 1095 01:11:21,040 --> 01:11:23,520 Any others? 1096 01:11:23,520 --> 01:11:28,680 Do we have a motion to approve items A, C and D? 1097 01:11:28,680 --> 01:11:29,680 Second. 1098 01:11:29,680 --> 01:11:33,080 All in favor say aye. 1099 01:11:33,080 --> 01:11:34,080 Aye. 1100 01:11:34,080 --> 01:11:35,080 Opposed? 1101 01:11:35,080 --> 01:11:36,080 Okay. 1102 01:11:36,080 --> 01:11:37,080 Item B. 1103 01:11:37,080 --> 01:12:00,560 I don't really need any additional details. 1104 01:12:00,560 --> 01:12:04,280 We just had a conflict of interest so she had to step out of the room and I guess I 1105 01:12:04,280 --> 01:12:07,360 had to pull it so that's why we did that. 1106 01:12:07,360 --> 01:12:08,360 Yes sir. 1107 01:12:08,360 --> 01:12:09,360 Thank you. 1108 01:12:09,360 --> 01:12:13,480 Anyway, if that's it, that's it. 1109 01:12:13,480 --> 01:12:14,480 That's it. 1110 01:12:14,480 --> 01:12:15,480 That is it. 1111 01:12:15,480 --> 01:12:16,720 Do we have a motion to approve item B? 1112 01:12:16,720 --> 01:12:18,360 Move to approve item B. 1113 01:12:18,360 --> 01:12:19,360 Second. 1114 01:12:19,360 --> 01:12:21,240 All in favor say aye. 1115 01:12:21,240 --> 01:12:22,240 Aye. 1116 01:12:22,240 --> 01:12:23,240 Opposed? 1117 01:12:23,240 --> 01:12:24,240 Motion carries. 1118 01:12:24,240 --> 01:12:25,680 Will you tell her she can come back in? 1119 01:12:25,680 --> 01:12:28,680 Tell her she can come back in. 1120 01:12:28,680 --> 01:12:29,680 Oh yeah. 1121 01:12:29,680 --> 01:12:30,680 Oh yeah. 1122 01:12:30,680 --> 01:12:31,680 That's right. 1123 01:12:31,680 --> 01:12:32,680 You have to leave now. 1124 01:12:32,680 --> 01:12:33,680 Okay. 1125 01:12:33,680 --> 01:12:34,680 Okay. 1126 01:12:34,680 --> 01:12:47,040 Do we'll recluse q zeroes today, I can't say that word. 1127 01:12:47,040 --> 01:12:48,040 All right. 1128 01:12:48,040 --> 01:12:53,960 Next item is consider, oh he didn't need to step out quite yet, but consider approval 1129 01:12:53,960 --> 01:12:58,320 of public utility board meetings of April 22, 2019. 1130 01:12:58,320 --> 01:13:02,040 Were there any changes or corrections? 1131 01:13:02,040 --> 01:13:04,800 And they'll stand approved as presented. 1132 01:13:04,800 --> 01:13:09,960 And now item B, consider recommending the adoption of an ordinance for the city of Denton, 1133 01:13:09,960 --> 01:13:16,240 a Texas home rule municipal corporation, authorizing the city manager to execute a contract with, 1134 01:13:16,240 --> 01:13:22,240 I can never say that, JAGO, public company Inc. for the construction of PEC for drainage 1135 01:13:22,240 --> 01:13:27,320 improvements phase one and two and Elm and Locust street water improvements phase one 1136 01:13:27,320 --> 01:13:33,040 for the city of Denton. 1137 01:13:33,040 --> 01:13:34,040 Good morning. 1138 01:13:34,040 --> 01:13:35,040 Good morning. 1139 01:13:35,040 --> 01:13:36,600 Board chair and board members. 1140 01:13:36,600 --> 01:13:37,760 My name is Jim Jenks. 1141 01:13:37,760 --> 01:13:40,280 I'm with the city's engineering department. 1142 01:13:40,280 --> 01:13:43,800 I'm the project manager on this particular project. 1143 01:13:43,800 --> 01:13:51,040 Sorry, I'm going to need a little help just for a moment getting their presentation up 1144 01:13:51,040 --> 01:13:59,080 and running here. 1145 01:13:59,080 --> 01:14:07,160 Is it not there? 1146 01:14:07,160 --> 01:14:14,240 Is it hiding underneath the little menu there? 1147 01:14:14,240 --> 01:14:17,520 I think it's in the corner. 1148 01:14:17,520 --> 01:14:29,200 Click there so we can get rid of the box. 1149 01:14:29,200 --> 01:14:38,560 And there it is in the corner. 1150 01:14:38,560 --> 01:14:39,560 Thank you. 1151 01:14:39,560 --> 01:14:40,560 Sorry about that. 1152 01:14:40,560 --> 01:14:46,240 I have a very brief presentation this morning just to go over the basics of this project. 1153 01:14:46,240 --> 01:14:52,920 But basically, this is again the PEC for phase one and two drainage improvements project 1154 01:14:52,920 --> 01:15:03,120 that includes the Elm and Locust water and sewer improvements from Hickory to Eagle. 1155 01:15:03,120 --> 01:15:08,960 Basically the scope of the project is illustrated in this map here. 1156 01:15:08,960 --> 01:15:14,400 The major portion of the drainage is what's shown in red. 1157 01:15:14,400 --> 01:15:22,480 That is our box culvert that's an 18 foot wide by 8 foot tall reinforced box culvert. 1158 01:15:22,480 --> 01:15:29,920 There are also some drainage pipes that extend northward along Elm and Locust streets also. 1159 01:15:29,920 --> 01:15:36,360 And what's shown in blue here is the public water and wastewater improvement projects 1160 01:15:36,360 --> 01:15:45,080 or portions of this project going along Elm and Locust from Eagle up to Hickory. 1161 01:15:45,080 --> 01:15:52,960 All in all, there's about 1,500 feet of this large 18 by 8 foot box culvert, about 3,100 1162 01:15:52,960 --> 01:16:02,640 feet of the drainage concrete pipe, 18 inch to 48 inch in diameter, about 5,900 feet of 1163 01:16:02,640 --> 01:16:10,960 water lines ranging from 8 inch to 20 inch and about 7,800 feet of sewer lines, sanitary 1164 01:16:10,960 --> 01:16:15,520 sewer ranging from 8 inch to 24 inch. 1165 01:16:15,520 --> 01:16:24,600 It's with the scope of the project and the sequencing issues involved, the contract construction 1166 01:16:24,600 --> 01:16:32,780 timeframe is 730 calendar days. 1167 01:16:32,780 --> 01:16:39,200 This project was bid and this was actually the re-bid following the initial bid last 1168 01:16:39,200 --> 01:16:47,520 fall which was ultimately rejected due to the price from the one bid being higher than 1169 01:16:47,520 --> 01:16:51,520 staff thought it should be for this project. 1170 01:16:51,520 --> 01:17:01,040 We went back, valued engineered, added some options in design and bidding, pardon me, 1171 01:17:01,040 --> 01:17:05,760 and here are the results that came from the re-bid. 1172 01:17:05,760 --> 01:17:11,680 You'll see there was three bidders, the lowest being Jago Public Company. 1173 01:17:11,680 --> 01:17:24,240 What is shown here is we have a base bid and an alternate bid and those total to the scope 1174 01:17:24,240 --> 01:17:32,880 of work that I had shown you in the previous slide with the map, basically to get the award 1175 01:17:32,880 --> 01:17:38,120 amount under what was funded for this project. 1176 01:17:38,120 --> 01:17:44,240 We found that we would need to delete the fiber optic and traffic items. 1177 01:17:44,240 --> 01:17:51,360 Basically what I'm talking about there is there's two 2 inch conduits along Elm and 1178 01:17:51,360 --> 01:18:00,740 Locust, kind of similar to what is shown in blue here as far as extents. 1179 01:18:00,740 --> 01:18:07,040 Those were to facilitate the future installation of fiber optic lines there. 1180 01:18:07,040 --> 01:18:12,920 Division of those items, we consulted with purchasing, make sure it was okay to do that. 1181 01:18:12,920 --> 01:18:16,600 It did not change the order of the bidders and so it was determined that that would be 1182 01:18:16,600 --> 01:18:17,600 fine. 1183 01:18:17,600 --> 01:18:18,600 That was going to be my question. 1184 01:18:18,600 --> 01:18:21,600 You took it out of all of them. 1185 01:18:21,600 --> 01:18:22,600 Right. 1186 01:18:22,600 --> 01:18:29,720 The amounts that you see here reflect that deletion. 1187 01:18:29,720 --> 01:18:39,840 Basically the low bid amount with Jago Public is about 10.96 million. 1188 01:18:39,840 --> 01:18:52,440 What we have found in your AIS, I mentioned towards the end of the information for bidder 1189 01:18:52,440 --> 01:19:01,000 background section, there was a funding gap still, although the re-bidding process knocked 1190 01:19:01,000 --> 01:19:05,300 a couple million dollars off the bid amounts, there was still a funding gap that we had. 1191 01:19:05,300 --> 01:19:13,200 So we worked with the drainage department to identify funds that could be transferred 1192 01:19:13,200 --> 01:19:18,060 and so that's what I'm speaking to in that part of the AIS. 1193 01:19:18,060 --> 01:19:23,440 There was funds transferred from the oak tree project, from the Choctaw project, and from 1194 01:19:23,440 --> 01:19:27,240 the channel rehab account. 1195 01:19:27,240 --> 01:19:33,600 In the oak tree project and the Choctaw project, there is still money left in those projects 1196 01:19:33,600 --> 01:19:38,040 to complete design. 1197 01:19:38,040 --> 01:19:42,960 The last slide I have here is just the formal recommendation. 1198 01:19:42,960 --> 01:19:49,000 RF is recommending that the city approve an ordinance to execute the construction contract 1199 01:19:49,000 --> 01:20:00,160 between the city and Jago Public Company in the amount of $10,960,623.19 for the PEK-4 1200 01:20:00,160 --> 01:20:04,520 phase 1 and 2 drainage improvements and elm and locust water and sewer improvements from 1201 01:20:04,520 --> 01:20:06,120 Hickory to Eagle. 1202 01:20:06,120 --> 01:20:10,220 And again, this would correspond to the award of the base bid plus the alternate bid minus 1203 01:20:10,220 --> 01:20:13,200 the fiber optic and traffic improvements. 1204 01:20:13,200 --> 01:20:15,440 And that is the extent of my presentation. 1205 01:20:15,440 --> 01:20:17,360 I'd be happy to stand for any questions. 1206 01:20:17,360 --> 01:20:18,360 Questions? 1207 01:20:18,360 --> 01:20:25,960 I just had a quick question, I need some education on how bond money works with this. 1208 01:20:25,960 --> 01:20:31,760 There was, in the 2014 bond, there was $2.4 million for PEK-4. 1209 01:20:31,760 --> 01:20:37,000 Is that being folded into this $10 million or has that already been spent for design 1210 01:20:37,000 --> 01:20:41,880 or what happened with the bond money that was going towards this? 1211 01:20:41,880 --> 01:20:44,680 Do we have any idea? 1212 01:20:44,680 --> 01:20:45,680 Yeah, here it comes. 1213 01:20:45,680 --> 01:20:51,880 I have the breakdown of the accounts that maybe what she's referring to perhaps. 1214 01:20:51,880 --> 01:20:52,880 Hi. 1215 01:20:52,880 --> 01:20:53,880 Hi. 1216 01:20:53,880 --> 01:20:54,880 Lee Perry, Assistant City Engineer. 1217 01:20:54,880 --> 01:20:59,520 So PEK-4, yeah, phase 1 and phase 2 both had bond money and that's a part of this. 1218 01:20:59,520 --> 01:21:03,240 And that's just been folded in, those bonds have already been sold? 1219 01:21:03,240 --> 01:21:04,240 Yes. 1220 01:21:04,240 --> 01:21:05,240 Okay. 1221 01:21:05,240 --> 01:21:07,160 I wasn't sure how that worked. 1222 01:21:07,160 --> 01:21:08,160 Other question? 1223 01:21:08,160 --> 01:21:09,160 Thank you. 1224 01:21:09,160 --> 01:21:11,600 I have a question about the fiber optic and the traffic improvements. 1225 01:21:11,600 --> 01:21:16,720 I know they're not going to be done here, but is that something that is needed and are 1226 01:21:16,720 --> 01:21:23,160 we looking at doing that later on or are we looking at having that funded in some other 1227 01:21:23,160 --> 01:21:24,160 way or? 1228 01:21:24,160 --> 01:21:27,880 We'll be looking at that with our traffic department as far as other options to make 1229 01:21:27,880 --> 01:21:28,880 that happen. 1230 01:21:28,880 --> 01:21:29,880 Okay. 1231 01:21:29,880 --> 01:21:30,880 All right, great. 1232 01:21:30,880 --> 01:21:31,880 All right. 1233 01:21:31,880 --> 01:21:32,880 Just wanted to make sure. 1234 01:21:32,880 --> 01:21:33,880 And then I have a question. 1235 01:21:33,880 --> 01:21:38,880 With the bids, there's about a $2 million difference between bidders. 1236 01:21:38,880 --> 01:21:43,880 How confident are we that something didn't get missed by JAGO that's going to come back 1237 01:21:43,880 --> 01:21:47,200 as a change order or something like that? 1238 01:21:47,200 --> 01:21:55,600 Well, we have about a $1.2 million difference there between them and the second low bidder. 1239 01:21:55,600 --> 01:22:01,840 JAGO was the, in the fall when we bid it the first time and got the one bid, they were 1240 01:22:01,840 --> 01:22:04,400 the one bidder. 1241 01:22:04,400 --> 01:22:11,120 So they have, they're, they've been looking at the project for a while. 1242 01:22:11,120 --> 01:22:12,120 Sorry. 1243 01:22:12,120 --> 01:22:14,280 Go ahead. 1244 01:22:14,280 --> 01:22:17,440 And they're also currently mobilized at the Eagle Drainage Project. 1245 01:22:17,440 --> 01:22:18,440 Gotcha. 1246 01:22:18,440 --> 01:22:19,440 That makes a difference. 1247 01:22:19,440 --> 01:22:20,440 Okay. 1248 01:22:20,440 --> 01:22:24,120 And so they're, they'll be ready to start this project right once they're wrapping 1249 01:22:24,120 --> 01:22:25,120 it up. 1250 01:22:25,120 --> 01:22:26,120 That makes a difference. 1251 01:22:26,120 --> 01:22:27,120 Thank you. 1252 01:22:27,120 --> 01:22:28,120 Okay. 1253 01:22:28,120 --> 01:22:34,440 Do we have a motion to approve? 1254 01:22:34,440 --> 01:22:35,440 So moved. 1255 01:22:35,440 --> 01:22:36,440 I second. 1256 01:22:36,440 --> 01:22:37,440 All in favor say aye. 1257 01:22:37,440 --> 01:22:38,440 Aye. 1258 01:22:38,440 --> 01:22:39,440 Opposed? 1259 01:22:39,440 --> 01:22:40,440 Okay. 1260 01:22:40,440 --> 01:22:41,440 That carries. 1261 01:22:41,440 --> 01:22:42,440 Next item. 1262 01:22:42,440 --> 01:22:46,080 Consider recommending adoption of an ordinance of the City of Denton, Texas, a Texas Home 1263 01:22:46,080 --> 01:22:52,080 Rule Municipal Corporation, authorizing the city manager to execute a public works contract 1264 01:22:52,080 --> 01:22:56,960 with Raymar Construction for the construction of Hickory Creek Lift Station for the City 1265 01:22:56,960 --> 01:23:01,560 of Denton, providing for the expenditure of funds, therefore, and providing an effective 1266 01:23:01,560 --> 01:23:10,720 date, and the contract is not to exceed $3,418,000. 1267 01:23:10,720 --> 01:23:15,280 Good morning again. 1268 01:23:15,280 --> 01:23:18,560 Ken Banks, General Manager of Utilities. 1269 01:23:18,560 --> 01:23:26,520 This project is one that we had spoke about a little bit earlier in the, in the budget. 1270 01:23:26,520 --> 01:23:31,320 The existing Hickory Creek Lift Station pumps all the wastewater flows from the entire Hickory 1271 01:23:31,320 --> 01:23:37,320 Creek sewer sub-base into the concrete plant, and that station's getting pretty, pretty 1272 01:23:37,320 --> 01:23:39,000 old. 1273 01:23:39,000 --> 01:23:47,100 If you recall, there was a failure of this station back in February of 2018. 1274 01:23:47,100 --> 01:23:53,640 We had a pump that appears to have been trained a piece of material and caused a catastrophic 1275 01:23:53,640 --> 01:23:55,920 failure at the pump station. 1276 01:23:55,920 --> 01:24:00,880 Essentially, the electronics are getting outdated. 1277 01:24:00,880 --> 01:24:07,360 The initial design is starting to create a backup in the interceptor itself, and that's 1278 01:24:07,360 --> 01:24:13,440 just under normal conditions, so it's time to basically go in and put a more modern version 1279 01:24:13,440 --> 01:24:16,520 of a pump station in there. 1280 01:24:16,520 --> 01:24:23,440 There have been a few service interruptions, as I spoke about, and this was actually authorized 1281 01:24:23,440 --> 01:24:28,600 in terms of the design contract by the City Council back in February 7th of 2017, so we've 1282 01:24:28,600 --> 01:24:31,360 had this on our radar screen for a little while. 1283 01:24:31,360 --> 01:24:37,200 Funding for construction was included in the FY19 budget at about $3.7 million. 1284 01:24:37,200 --> 01:24:41,200 Just to give you a rough idea, and it's not a, not a great map, but you can see kind of 1285 01:24:41,200 --> 01:24:44,400 where, where we're talking about. 1286 01:24:44,400 --> 01:24:50,600 This is the Hickory Creek interceptor right here, and this is the pump station that we're 1287 01:24:50,600 --> 01:24:54,920 referring to that pumps into a force main here, and then gravity feeds onto the concrete 1288 01:24:54,920 --> 01:24:56,280 plant. 1289 01:24:56,280 --> 01:25:02,480 So this is Teasley where it turns, and this is where old Alton comes across and goes over 1290 01:25:02,480 --> 01:25:06,160 Hickory Creek, so kind of give you an idea of where this thing is. 1291 01:25:06,160 --> 01:25:11,840 So you can see it's collecting from a pretty sizable area of that portion of the basin. 1292 01:25:11,840 --> 01:25:17,240 So it was advertised for bid in November of 2018 after the final plans were completed. 1293 01:25:17,240 --> 01:25:19,160 We got two bids. 1294 01:25:19,160 --> 01:25:28,480 The lowest bidder was Raymar Construction, and their experience was evaluated, and they 1295 01:25:28,480 --> 01:25:32,000 have the qualifications to be able to complete this job. 1296 01:25:32,000 --> 01:25:34,100 Bid came in at $3.4 million. 1297 01:25:34,100 --> 01:25:40,600 We had budgeted around $3.7, so came in a little bit under budget, and that's pretty 1298 01:25:40,600 --> 01:25:42,680 much the extent of the project. 1299 01:25:42,680 --> 01:25:46,880 Staff is recommending approval of this contract with Raymar so we can progress on the Hickory 1300 01:25:46,880 --> 01:25:47,880 Creek station. 1301 01:25:47,880 --> 01:25:51,280 And I'd be glad to answer any questions. 1302 01:25:51,280 --> 01:25:52,280 Questions? 1303 01:25:52,280 --> 01:25:53,280 No? 1304 01:25:53,280 --> 01:25:57,720 Do we have a motion to approve? 1305 01:25:57,720 --> 01:25:58,720 Motion to approve. 1306 01:25:58,720 --> 01:25:59,720 Second. 1307 01:25:59,720 --> 01:26:01,320 All in favor say aye. 1308 01:26:01,320 --> 01:26:02,320 Aye. 1309 01:26:02,320 --> 01:26:03,320 Thank you. 1310 01:26:03,320 --> 01:26:04,320 Motion carries. 1311 01:26:04,320 --> 01:26:05,320 Let's see. 1312 01:26:05,320 --> 01:26:06,800 Next item. 1313 01:26:06,800 --> 01:26:10,920 Consider recommending adoption of an ordinance of the City of Denton authorizing the City 1314 01:26:10,920 --> 01:26:17,040 Manager or is designated to execute a purchase agreement by and between MD Massoud Rizab 1315 01:26:17,040 --> 01:26:24,140 and the City regarding the sale and purchase of a fee simple to an approximate 1.656 acre 1316 01:26:24,140 --> 01:26:28,280 track more or less situated in the Alexander Hill survey area. 1317 01:26:28,280 --> 01:26:32,440 I'm going to skip through. 1318 01:26:32,440 --> 01:26:39,000 For the amount of $2,999,750. 1319 01:26:39,000 --> 01:26:40,000 Good morning. 1320 01:26:40,000 --> 01:26:43,620 Paul Williamson, Real Estate Manager. 1321 01:26:43,620 --> 01:26:49,840 Today before you for your consideration is a purchase agreement for the proposed Eagle 1322 01:26:49,840 --> 01:26:59,600 Drive substation site, electric substation, location map showing it at the corner of Bernard 1323 01:26:59,600 --> 01:27:08,400 and Eagle Drive. 1324 01:27:08,400 --> 01:27:13,440 Things to consider, this track's been in play for quite a long time now so we're 1325 01:27:13,440 --> 01:27:18,760 kind of toward the end, the culmination of an actual acquisition. 1326 01:27:18,760 --> 01:27:26,160 We've got a counteroffer for settlement by the owner that's been delivered to us and 1327 01:27:26,160 --> 01:27:30,800 for y'all's consideration for a potential recommendation and I stand for any questions 1328 01:27:30,800 --> 01:27:33,440 y'all might have. 1329 01:27:33,440 --> 01:27:34,440 Questions? 1330 01:27:34,440 --> 01:27:35,440 Paul. 1331 01:27:35,440 --> 01:27:36,440 Good morning. 1332 01:27:36,440 --> 01:27:37,440 Good morning. 1333 01:27:37,440 --> 01:27:42,040 Is there any other expenses that are associated with this or relocations or? 1334 01:27:42,040 --> 01:27:47,320 Yeah, there are relocation entitlements for not only the tenants, any tenants that may 1335 01:27:47,320 --> 01:27:48,920 be there. 1336 01:27:48,920 --> 01:27:50,120 It's somewhat vacant now. 1337 01:27:50,120 --> 01:27:54,640 I think there's the tenant in the convenience store and there may be one additional tenant 1338 01:27:54,640 --> 01:28:02,960 but the tenants, those entitlements are there and so they're due by law for those and even 1339 01:28:02,960 --> 01:28:09,160 the business, the owner of the land himself, he may be entitled to some relocation benefits 1340 01:28:09,160 --> 01:28:10,160 as well. 1341 01:28:10,160 --> 01:28:11,600 That's not in this budget. 1342 01:28:11,600 --> 01:28:15,040 No, they're considered as a separate matter. 1343 01:28:15,040 --> 01:28:22,560 Well, we've been talking about this for a while so do we have a motion to approve? 1344 01:28:22,560 --> 01:28:23,560 Motion to approve. 1345 01:28:23,560 --> 01:28:24,560 I second it. 1346 01:28:24,560 --> 01:28:26,040 All in favor say aye. 1347 01:28:26,040 --> 01:28:27,040 Aye. 1348 01:28:27,040 --> 01:28:28,040 Thank you. 1349 01:28:28,040 --> 01:28:29,040 Motion carries. 1350 01:28:29,040 --> 01:28:30,040 ACM update. 1351 01:28:30,040 --> 01:28:31,040 Thank you. 1352 01:28:31,040 --> 01:28:32,040 I just have two items. 1353 01:28:32,040 --> 01:28:33,040 You've got the new business action items. 1354 01:28:33,040 --> 01:28:41,840 We've got the one pending item to discuss the meeting time. 1355 01:28:41,840 --> 01:28:47,720 I'm going to work with the city manager's office before I get that scheduled here, upcoming 1356 01:28:47,720 --> 01:28:48,720 meeting here shortly. 1357 01:28:48,720 --> 01:28:55,720 And then the future public utility board agenda items, predominantly you can see that we're 1358 01:28:55,720 --> 01:29:00,720 in budget time. 1359 01:29:00,720 --> 01:29:05,640 You can see that we're in budget time right now, so we've got a lot of upcoming budget 1360 01:29:05,640 --> 01:29:06,640 presentations. 1361 01:29:06,640 --> 01:29:13,720 So that's all I have and oh, I didn't want to acknowledge, I'm sorry. 1362 01:29:13,720 --> 01:29:18,520 We do have a tour scheduled for the water, wastewater and solid waste facilities that 1363 01:29:18,520 --> 01:29:23,720 is going to occur on May the 17th. 1364 01:29:23,720 --> 01:29:27,080 It's going to be from 830 till approximately noon. 1365 01:29:27,080 --> 01:29:35,160 We have three takers so far, so I'm looking forward to all of y'all seeing the plans. 1366 01:29:35,160 --> 01:29:38,600 I think you'll enjoy the tour. 1367 01:29:38,600 --> 01:29:43,080 If another PUD member is interested, you're more than welcome, but keep in mind we have 1368 01:29:43,080 --> 01:29:45,320 to post if we go above three. 1369 01:29:45,320 --> 01:29:49,880 So just if you could let us know. 1370 01:29:49,880 --> 01:29:50,880 That's all I have. 1371 01:29:50,880 --> 01:29:52,440 All right. 1372 01:29:52,440 --> 01:29:58,120 Boarding items, is there any item that a board member would like placed on the agenda in 1373 01:29:58,120 --> 01:29:59,120 the future? 1374 01:29:59,120 --> 01:30:08,080 I don't have an agenda item, but through email we received information about attendance. 1375 01:30:08,080 --> 01:30:09,080 Yes. 1376 01:30:09,080 --> 01:30:14,320 And I wanted to know, was that a change in the current attendance policy or was that 1377 01:30:14,320 --> 01:30:18,960 just a reminder or how come we got sent the attendance policy? 1378 01:30:18,960 --> 01:30:22,840 Oh, that's been a policy forever. 1379 01:30:22,840 --> 01:30:28,240 I think we were just not enforcing it maybe. 1380 01:30:28,240 --> 01:30:31,640 It came up with city council. 1381 01:30:31,640 --> 01:30:32,640 Say that again. 1382 01:30:32,640 --> 01:30:35,680 It came up with city council, but this is a trickle down. 1383 01:30:35,680 --> 01:30:41,880 So no one wants to own up to why we got sent that particular email. 1384 01:30:41,880 --> 01:30:42,880 Kim sent it. 1385 01:30:42,880 --> 01:30:43,880 I don't know who told you to send it. 1386 01:30:43,880 --> 01:30:44,880 You're the messenger. 1387 01:30:44,880 --> 01:30:51,880 You're not going to tell us who told you? 1388 01:30:51,880 --> 01:30:54,640 I actually thought it was two, not three. 1389 01:30:54,640 --> 01:30:55,640 It said three, right? 1390 01:30:55,640 --> 01:30:56,640 And I thought it was two. 1391 01:30:56,640 --> 01:31:01,320 I swear my handbook says two, so at any rate. 1392 01:31:01,320 --> 01:31:02,320 Can I make a suggestion? 1393 01:31:02,320 --> 01:31:03,320 Sure. 1394 01:31:03,320 --> 01:31:08,720 Let me follow up with that and we'll provide a small informal staff report and send it 1395 01:31:08,720 --> 01:31:10,080 out to the board. 1396 01:31:10,080 --> 01:31:11,080 That would be wonderful. 1397 01:31:11,080 --> 01:31:14,680 I'm curious if that's the same for all boards and commissions, because some only meet like 1398 01:31:14,680 --> 01:31:20,760 four times a year, and some of us meet 12 times a year, and it seems like attendance. 1399 01:31:20,760 --> 01:31:21,760 Hospital 24. 1400 01:31:21,760 --> 01:31:22,760 What's that? 1401 01:31:22,760 --> 01:31:23,760 Hospital 24. 1402 01:31:23,760 --> 01:31:24,760 Indeed. 1403 01:31:24,760 --> 01:31:27,560 I was just throwing out some numbers there, you know, because I know some only meet when 1404 01:31:27,560 --> 01:31:28,560 they have to. 1405 01:31:28,560 --> 01:31:34,920 But really we're just going to let it be us that discusses this, and you, nobody's got 1406 01:31:34,920 --> 01:31:35,920 it. 1407 01:31:35,920 --> 01:31:36,920 Okay. 1408 01:31:36,920 --> 01:31:37,920 All right. 1409 01:31:37,920 --> 01:31:38,920 Well, it was always the policy. 1410 01:31:38,920 --> 01:31:39,920 Yeah, yeah, yeah. 1411 01:31:39,920 --> 01:31:40,920 I understand that. 1412 01:31:40,920 --> 01:31:41,920 I read the policy. 1413 01:31:41,920 --> 01:31:46,040 And Kim sent us a reminder of the policy, I guess. 1414 01:31:46,040 --> 01:31:47,040 Yeah. 1415 01:31:47,040 --> 01:31:48,040 No problem. 1416 01:31:48,040 --> 01:31:49,040 Thank you. 1417 01:31:49,040 --> 01:31:50,040 All right. 1418 01:31:50,040 --> 01:31:52,480 Any other items? 1419 01:31:52,480 --> 01:31:53,480 Motion to adjourn? 1420 01:31:53,480 --> 01:31:54,480 It's a high move. 1421 01:31:54,480 --> 01:31:55,480 We adjourn. 1422 01:31:55,480 --> 01:31:56,480 We're adjourned. 1423 01:31:56,480 --> 01:31:56,480 Without my answer about attendance.