1 00:00:00,000 --> 00:00:04,440 Okay, it is nine o'clock and we do have a quorum. 2 00:00:04,440 --> 00:00:09,040 So I'm going to call to order the public utilities board for the city of Denton on Monday, 3 00:00:09,040 --> 00:00:11,660 August 14th, 2023. 4 00:00:11,660 --> 00:00:18,260 The first item is addressing the public utility board by the public. 5 00:00:18,260 --> 00:00:21,700 Does anybody from the public wish to address the board? 6 00:00:21,700 --> 00:00:25,500 I see none. So we'll move into the regular meeting. 7 00:00:25,500 --> 00:00:32,240 Consent agenda, does any board member wish to pull an item A through N? 8 00:00:32,240 --> 00:00:37,840 Okay, I see none. Do we have a motion to approve the consent items A through N? 9 00:00:37,840 --> 00:00:39,440 Move approval. 10 00:00:39,440 --> 00:00:40,240 And a second? 11 00:00:40,240 --> 00:00:40,740 Second. 12 00:00:40,740 --> 00:00:42,840 Board of Seconds, all in favor say aye. 13 00:00:42,840 --> 00:00:44,340 Aye. 14 00:00:44,340 --> 00:00:53,240 Motion carries. Next item is consider the approval of the July 24th, 2023 minutes. 15 00:00:53,240 --> 00:00:55,800 Does anyone have any changes or corrections? 16 00:00:55,800 --> 00:00:58,300 Do we have a motion to approve the minutes? 17 00:00:58,300 --> 00:00:59,540 So moved. 18 00:00:59,540 --> 00:01:02,260 Thomas moves. Do we have a second? 19 00:01:02,260 --> 00:01:04,640 Barbara seconds. All in favor say aye. 20 00:01:04,640 --> 00:01:06,400 Aye. 21 00:01:06,400 --> 00:01:21,500 Okay, moving into PUB 2328, recommend the approval of the solid waste and recycling fiscal year budget 2023-2024. 22 00:01:21,500 --> 00:01:37,800 I was going to say who's coming next to you? 23 00:01:37,800 --> 00:01:41,060 Good morning, Amy Kaslik. I'm the city's interim finance director. 24 00:01:41,060 --> 00:01:51,460 I'm here this morning to seek the board's recommendation on approval of solid waste 2023-2024 budget and capital plan. 25 00:01:51,460 --> 00:02:00,600 Financial assumptions for solid waste and recycling include 2.5% growth rate and a 3% increase in role of customers. 26 00:02:00,600 --> 00:02:08,160 Revenue projections include wholesale agreements totaling a little over $4 million for next fiscal year. 27 00:02:08,160 --> 00:02:18,500 While expenditure projections include annual contributions to the closure/post closure fund as well as increases in personnel and operating costs. 28 00:02:18,500 --> 00:02:27,760 So looking at the performa for this fund, we anticipate ending the year with revenues coming in about $2 million under adopted budget. 29 00:02:27,760 --> 00:02:39,260 The primary driver of this is non-rate revenues, which includes the sale of scrap metal as well as the recycling program and other diversion efforts. 30 00:02:39,260 --> 00:02:51,860 While overall the expenditure budget is in line with last year's adopted budget, increases exist in personnel costs related to the class and comp study as well as a 2% merit increase. 31 00:02:51,860 --> 00:03:11,120 Cost of service transfers related in part to programs and related contracts being moved to environmental services to sustainability, debt service and the purchase of a cart washing truck that is set to be funded from capital. 32 00:03:11,120 --> 00:03:25,760 So then looking at their capital plan, solid waste has $10.7 million in capital expenses planned for fiscal year 2024 and a five-year capital plan of $54.4 million. 33 00:03:25,760 --> 00:03:34,320 Of that $45.8 million will be bond funded and $8.6 million will be revenue funded. 34 00:03:34,320 --> 00:03:46,000 This includes $7.1 million in bond funded capital and $3.6 million in revenue funded capital specific to fiscal year 2024. 35 00:03:46,000 --> 00:04:00,020 Key projects include cell five and six construction for $5.4 million, home chemical collection storage facility for $2 million, and then vehicle replacements for $5.6 million. 36 00:04:00,020 --> 00:04:13,920 Next steps for the solid waste and recycling budget, we'll be coming back to this board on August the 28th to look at changes in fees. 37 00:04:13,920 --> 00:04:31,320 There is not a rate increase planned at this point for 2024, so it will be limited to fees, and then we will move forward to public hearings and then budget adoption on September 26th. 38 00:04:31,320 --> 00:04:51,120 >> City Council? >> Yeah. >> Okay. Sorry. >> Oh, you know, I'm just moving way ahead. >> Goodness. We think so far in advance here that, you know, we've already got it planned. 39 00:04:51,120 --> 00:05:00,320 I'm going to bet you're going to see that throughout this presentation. We just are forward thinkers. >> Okay. >> Any questions? 40 00:05:00,320 --> 00:05:13,320 All right. Do we have a motion to approve the solid waste recycling budget for fiscal year 2023-24? 41 00:05:13,320 --> 00:05:23,320 >> Move approval. >> Okay. Billy moves approval. Do we have a second? >> Second. >> Thomas seconds. All in favor say aye. >> Aye. >> Thank you. >> Carries. Thank you. 42 00:05:23,320 --> 00:05:36,320 Next item is consider recommending the approval of the water fiscal year 2023-24 operating in capital budget. You're doing that one too, aren't you? >> I am. 43 00:05:36,320 --> 00:05:54,320 >> All right. So, again, looking at the water utilities, water budget for fiscal year 2024, financial assumptions for this fund as well as other utilities is a 2.5% increase in our population, our rate of growth. 44 00:05:54,320 --> 00:06:06,320 Expenditure projections include moderate increases in personnel and operating costs. And for this fund, there are no rate increases anticipated for fiscal year 2024. 45 00:06:06,320 --> 00:06:22,320 Both revenue and expenditures are expected to come in under budget for the current fiscal year. Looking at the preliminary fiscal year 2024, and I'm sorry, this actually proposed 2024 budget, you'll see that we are using more impact fees to fund capital projects and debt service. 46 00:06:22,320 --> 00:06:32,320 A 2% increase and six additional positions needed to support water treatment plant operations as well as needed vehicles are included in the proposed budget. 47 00:06:32,320 --> 00:06:45,320 These increased expenditures are offset by reductions in expenses related to the movement of personnel and related costs to environmental services and sustainability. 48 00:06:45,320 --> 00:07:03,320 So, while we are meeting reserve balances and debt ratio targets in fiscal year 2024, we are anticipating rate increases in the four years following that. 49 00:07:03,320 --> 00:07:18,320 And then in looking at the capital plan, it includes $96.5 million in fiscal year 2024, and a five year total of $377.7 million in capital projects. 50 00:07:18,320 --> 00:07:31,320 Of this $82.8 million is proposed to be bond funded and $8 million revenue funded, as well as $5 million funded by impact fees in fiscal year 2024. 51 00:07:31,320 --> 00:07:56,320 Key projects include the automated meter reading infrastructure for $14 million, the Lake Louisville plant raw water transmission line for $7.5 million, Ray Roberts plant expansion for $154 million, Ray Roberts plant upgrades for $33 million, and then $27 million that supports the 2019 bond election. 52 00:07:56,320 --> 00:08:05,320 Next steps on this one since we will not be bringing back any rate or fee changes will be the public hearing on September 19. 53 00:08:05,320 --> 00:08:08,320 Questions. 54 00:08:08,320 --> 00:08:30,320 Okay, if there's no questions, do we have a motion to approve the water fiscal year 2023, 2024 operating and capital budgets. 55 00:08:30,320 --> 00:08:38,320 It's easy. Good. Glad to hear that. 56 00:08:38,320 --> 00:08:46,320 All right, so next up we have the wastewater fund and looking at the 2024 budget and capital plan. 57 00:08:46,320 --> 00:08:58,320 As with the water fund we assume a 2.5% growth rate expenditures include moderate increases for personnel and operating costs. 58 00:08:58,320 --> 00:09:19,320 We're going to cover that in detail at our next meeting revenues and expenditures included in the proposed budget are below last year's adopted budget. 59 00:09:19,320 --> 00:09:39,320 This is due to revenues associated with cost participation not being expected until further years out, unless revenue funded capital included in the proposed budget is the 2% merit increase for water reclamation operators for pecan Creek, a project manager and an inspector. 60 00:09:39,320 --> 00:09:48,320 These increases are offset by again the movement of personnel and related costs to environmental services and sustainability. 61 00:09:48,320 --> 00:09:58,320 The anticipated rate increases we are projected to meet cash balance requirements in all years and debt coverage in two out of the five years. 62 00:09:58,320 --> 00:10:09,320 And then it's important to know when we're looking at utilities that the rating agencies look at coverage for all utilities combined rather than one by one. 63 00:10:09,320 --> 00:10:12,320 Thank you for that note. 64 00:10:12,320 --> 00:10:30,320 So here's a look at the drainage port pro forma, which was also included in the numbers you saw on the previous slide but we want to show it here separately revenues and expenditures are in line with current year estimates proposed budget again includes that 2% increase for merit, a 65 00:10:30,320 --> 00:10:42,320 subdivision truck for examining infrastructure, a flushing truck cost of service study and an asset condition assessment. 66 00:10:42,320 --> 00:11:00,320 The wastewater capital plan includes $61.3 million in fiscal year 2024 and 385.1 million over the next five years of this 56 million is proposed to be funded with debt 2.9 million with revenues. 67 00:11:00,320 --> 00:11:25,320 2.5 million for vehicle replacement for fiscal year 2024 key projects include the pecan Creek plan expansion to 26 mgd the pecan Creek plant 75 mgd headworks project oversized participation and funds and support again of that 2019 bond election. 68 00:11:25,320 --> 00:11:30,320 So sorry. 69 00:11:30,320 --> 00:11:44,320 Once again, here's that schedule of our next meetings to cover the wastewater funds needs and again that will include changes in the rates. 70 00:11:44,320 --> 00:11:57,320 Questions. 71 00:11:57,320 --> 00:12:14,320 Thomas seconds all in favor say aye. Aye. Carries next items consider recommending the approval of the electric electric fiscal year 2023 24 operating in capital budgets. 72 00:12:14,320 --> 00:12:30,320 We're looking at DMEs budget and capital plan for fiscal year 2024. Again we assume a with this one we're assuming a 2.5% low growth and purchase power forecast and moderate increases in personnel and operating costs. 73 00:12:30,320 --> 00:12:48,320 The proposed budget is in line with last year's actuals but does include an additional 6.9 million in cash funded capital. The budget also includes the 2% merit increase escape a network assessment and outage coordinator relay technician 74 00:12:48,320 --> 00:13:07,320 and construction standards for voltage voltage conversion and that was part of their supplemental requests that are now included in the proposed budget. In addition, three vehicles are proposed to be purchased from the existing vehicle replacement funds. 75 00:13:07,320 --> 00:13:29,320 Knowing no rate increase has been included for fiscal year 2024. We are anticipating 3% rate increases from 2025 through 2028. There is also an option to do a one time rate increase and ask next fiscal year 2025 for 12.5%. 76 00:13:29,320 --> 00:13:38,320 And that helps to support and maintain the required reserve balances for this fund. 77 00:13:38,320 --> 00:13:59,320 So here is a high level summary of the CIP for the electric fund. The total proposed for 2024 is $93.1 million and a total of $411.9 million for the next five years. 78 00:13:59,320 --> 00:14:14,320 In addition, the CIP for the electric fund is $1.5 million in bonds, 6.9 million as I mentioned in revenue funded capital as well as $3.7 million for cost participation in fiscal year 2024. 79 00:14:14,320 --> 00:14:33,320 So the CIP for the electric fund is $1.5 million going forward and again there are no fee or rate increases for fiscal year 2024 included in this budget. 80 00:14:33,320 --> 00:14:45,320 So we have additional items coming forward for D&E. 81 00:14:45,320 --> 00:14:51,320 So any other questions? Do we have a motion to approve the electric fiscal year 2023-24 operating in capital budget? 82 00:14:51,320 --> 00:14:59,320 Move approval. Thank you, Billy. Second? Second. All in favor say aye. Aye. Motion carries. 83 00:14:59,320 --> 00:15:09,320 I'm recommending the approval of the customer service fiscal year 2023-24 operating in capital budgets. 84 00:15:09,320 --> 00:15:14,320 All right. And this is the last one that we'll be looking at this morning. 85 00:15:14,320 --> 00:15:31,320 In looking at the FORMA customer service is fully funded by the departments that it serves with the largest contributor being D&E. Costs are allocated based on call volume, bills processed as well as revenues collected from each of the contributing departments. 86 00:15:31,320 --> 00:15:43,320 At the end of the year, we do a true up to ensure that expenses have been correctly allocated and then actual expenditures and support each of the departments again that have been served. 87 00:15:43,320 --> 00:15:48,320 Preliminary expenditures show an increase of approximately $1.8 million. 88 00:15:48,320 --> 00:15:59,320 This is due to increases in personnel costs related to comp and class as well as a baseline adjustment of $700,000 for banking related to credit card usage. 89 00:15:59,320 --> 00:16:05,320 These increases are also reflected in the current year budget for customer service. 90 00:16:05,320 --> 00:16:18,320 An adjustment has been included for the plus one program increasing that program by $50,000 for a total program budget for plus one of $225,000. 91 00:16:18,320 --> 00:16:36,320 And this is just really based on an increased need for that assistance proposed budget also includes the 2% merit increase as well as additional staffing due to the implementation of the customer relationship system. 92 00:16:36,320 --> 00:16:48,320 Next steps are public hearing on September 19th and then budget adoption on September 26th. Okay. Any further questions. 93 00:16:48,320 --> 00:16:55,320 All right. Do we have a motion to approve the customer service fiscal year 2023 24 operating and capital budgets. 94 00:16:55,320 --> 00:17:15,320 So moved. Thomas moose. Do we have a second or seconds. All in favor say aye. Aye. Carries. Thank you. Thank you. Next item is P you be 23 140 contract with Oscar render come contracting ink for $18,064,385 and 85 cents. 95 00:17:26,320 --> 00:17:35,320 Good morning. This is going to be a I 35 quarter relocation utility another project that we've been doing continuation. 96 00:17:35,320 --> 00:17:43,320 This project will be from the split merge to us 380 that's that small portion there. 97 00:17:43,320 --> 00:17:56,320 The overview of the project. As I mentioned, it goes from the split up to the university 380 area and it crosses it a little bit, but this is the main section of construction and we'll be doing wastewater and water utility relocations. 98 00:17:56,320 --> 00:18:13,320 Like I said, this is in support of the wide end of the I 35 and this is 100% reimbursable project from text on excuse me. So that's that's schematic doesn't look like it's just showing the existing highway with where the new utilities will go. 99 00:18:13,320 --> 00:18:20,320 It's not showing the new highway. No, this is just the existing service not showing the flyovers and no sir. Okay. 100 00:18:20,320 --> 00:18:30,320 This is just what when we're done. This is what it'll look like. Okay. And then textile will come in with their whiting and the changes they have. Okay, that's good. 101 00:18:30,320 --> 00:18:36,320 Yeah, you look at it and it looks like the same thing. 102 00:18:36,320 --> 00:18:44,320 Yeah, it's a pretty good extensive projects about 10,000 linear feet, give or take with between the wastewater and water. 103 00:18:44,320 --> 00:18:50,320 And there'll be some abandonments and some and some removals as well. 104 00:18:50,320 --> 00:18:53,320 Any further questions in the slide. 105 00:18:53,320 --> 00:18:56,320 We had, this is a. 106 00:18:56,320 --> 00:18:59,320 It was an invitation for been IFP. 107 00:18:59,320 --> 00:19:06,320 These are the two companies out of the three we had pre qualified previously to do these projects. 108 00:19:06,320 --> 00:19:21,320 Only two applied this time, and it's Oscar Renda contracting a mountain cascade. They're pretty close in bed and Oscar Renda came in less with the 17 million. 109 00:19:21,320 --> 00:19:28,320 We've completed design in this around May, and we're going to public utility board today and we're going to counsel tomorrow. 110 00:19:28,320 --> 00:19:33,320 The reason for the short timeline is just because of text dots rush to get these projects done. 111 00:19:33,320 --> 00:19:49,320 The notice proceed will be after today or tomorrow if it gets approved today and tomorrow then I'll give a partial notice to proceed to purchase material, the following day on the 16th and then I anticipate the actual notice to proceed sometime in September. 112 00:19:49,320 --> 00:20:04,320 This is also a rush projects 180 day project so you can see right here, that's a very short timeline. And that's, you know, that's in line with what we've been doing just to meet text on. 113 00:20:04,320 --> 00:20:10,320 And we finished final completion will be sometime in the second quarter of 2024. 114 00:20:10,320 --> 00:20:24,320 It is very fast. As I mentioned before, they came in at seven logistics under over 17 million, and with a 5% contingency it'll bring it right over 18 million for total construction costs. 115 00:20:24,320 --> 00:20:30,320 But you remember this is going to be 100% reimbursable through text off. So we will get this money back. 116 00:20:30,320 --> 00:20:32,320 Any questions. 117 00:20:32,320 --> 00:20:34,320 Questions. 118 00:20:34,320 --> 00:20:43,320 Yes, ma'am. Thank you. Do we have a motion to approve pb 23 140. 119 00:20:43,320 --> 00:20:49,320 And a second second. All in favor say aye. Aye. Thank you. Motion carries. Thank you. 120 00:20:49,320 --> 00:20:51,320 Next item. 121 00:20:51,320 --> 00:21:12,320 Next item is pb 23 151 consider recommending an ordinance to approve contract with some construction for the bonnie bray three widening and reconstruction, and the amount of $40,318, $18,845 and 47 cents. 122 00:21:12,320 --> 00:21:20,320 Good morning everyone I'm Robin Davis with capital projects, and I'm here to present the bonnie bray phase three project. 123 00:21:20,320 --> 00:21:42,320 So this is the project that we've been working on for a long time, and we've been working on it for a long time, and we've been working on it for a long time, and we've been working on it for a long time, and we've been working on it for a long time, and we've been working on it for a long time, and we've been working on it for a long time, and we've been working on it for a long time, and we've been working on it for a long time. 124 00:21:42,320 --> 00:22:00,320 So we put these out for contractor so proposals, and we received three beds, so it was the lowest bid, but we also did the evaluations, based on their. 125 00:22:00,320 --> 00:22:15,320 The key personnel and these different scoring criteria, they were evaluated as the, as the best contractor, not just for price but on the other evaluation criteria as well. 126 00:22:15,320 --> 00:22:30,320 So you weren't required to do that, if you did the sealed bid but it's good to know that they also were the most qualified is that that's a correct statement, it was part of the, of the evaluation process for the CSP. 127 00:22:30,320 --> 00:22:35,320 Okay, so every one of those criteria were actually given a score. 128 00:22:35,320 --> 00:22:39,320 And we did include pricing as one of those criteria that were scored. 129 00:22:39,320 --> 00:22:42,320 Okay. 130 00:22:42,320 --> 00:22:49,320 Any other question on this slide. 131 00:22:49,320 --> 00:23:08,320 So, based on today and tomorrow, we anticipate Council award the project to the contractor, and we'll issue a notice to proceed will probably do that on September 5, since we have a holiday, and we're planning to host a public meeting prior to construction 132 00:23:08,320 --> 00:23:12,320 day, so that'll give us time to get all that done. 133 00:23:12,320 --> 00:23:24,320 We did put in there a substantial completion goal of 24 months with a final completion of 30 months. 134 00:23:24,320 --> 00:23:31,320 So we expect it to be finished in March of 2026 with that final completion. 135 00:23:31,320 --> 00:23:36,320 I'm curious, are there utility relocate you're waiting on out there still. 136 00:23:36,320 --> 00:23:44,320 No utilities we do have in like what we're working with right now that I'm sorry in link gas, oh gas. 137 00:23:44,320 --> 00:23:52,320 But everything else has been relocated. 138 00:23:52,320 --> 00:23:59,320 So with that, staff recommends approving the contract with site construction for the reconstruction and widening of Bonnie break phase three. 139 00:23:59,320 --> 00:24:02,320 And this was in the 2019 bond. 140 00:24:02,320 --> 00:24:13,320 I know. No, actually this project is funded from some RTR funds that we have for binary south, along with some other funding sources, we have some county funds. 141 00:24:13,320 --> 00:24:22,320 Additional county funds. We have trip funding that we've applied to it for the section from 35 to Woodrow. I mean, I'm sorry. 142 00:24:22,320 --> 00:24:35,320 Wood for the sidewalk and the side path completion. There's actually several DCT a stops in that area. So it qualified for the for some trip funding as well. 143 00:24:35,320 --> 00:24:38,320 Other questions. 144 00:24:38,320 --> 00:24:46,320 We have a motion to approve this contract with construction for 40 million three hundred and eighteen thousand four hundred and eighty five dollars and 47 cents. 145 00:24:46,320 --> 00:24:48,320 So moved. 146 00:24:48,320 --> 00:24:52,320 Seconds. All in favor say aye. Aye. I just want to make one statement. 147 00:24:52,320 --> 00:24:57,320 Laurie Hill purchasing manager with any competitive sale proposals we have to evaluate no matter what. 148 00:24:57,320 --> 00:25:03,320 Even if they want to go with low price, they just need to check references and go through the normal process, which is evaluating everything. 149 00:25:03,320 --> 00:25:07,320 I think that's a good practice. 150 00:25:07,320 --> 00:25:09,320 All right. Thank you. 151 00:25:09,320 --> 00:25:18,320 Okay. Management reports, Mr. Dixon. All right. Good morning, Madam Chair and committee. 152 00:25:18,320 --> 00:25:24,320 So the two first to the electric deck dashboard and the winter storm your update both have been published. 153 00:25:24,320 --> 00:25:32,320 We do have staff here to answer any questions you may have any questions. 154 00:25:32,320 --> 00:25:40,320 All right. And then we'll be coming back with any future agenda items and new business action items. But we have no none for today. 155 00:25:40,320 --> 00:25:43,320 Okay. 156 00:25:43,320 --> 00:25:52,320 That brings us to concluding items. Does any board member wish to say anything to the public or have something added to a future agenda item? 157 00:25:52,320 --> 00:26:06,320 Go ahead. Yes, I would like to see if there's something we can do about on the electrical lines, the poles that are used when other people attach to them. 158 00:26:06,320 --> 00:26:22,320 Can we and they leave excess wiring hanging sometimes on the ground and in the ground, the boxes that have wires that have no lids on them. 159 00:26:22,320 --> 00:26:30,320 And sometimes wires outside the public doesn't know if those are live or not. 160 00:26:30,320 --> 00:26:40,320 And it's usually not an electric line. It's somebody else that's attaching to our pole. Yes. 161 00:26:40,320 --> 00:26:45,320 It's been there since she moved in four years ago. 162 00:26:45,320 --> 00:26:51,320 It's not ours, but we're in control of that. We're the only people who can enforce it. 163 00:26:51,320 --> 00:26:58,320 The public doesn't know if those are live or not. 164 00:26:58,320 --> 00:27:04,320 So we we have a kind of an ongoing issue with pole attachments. 165 00:27:04,320 --> 00:27:16,320 You know, we any of the telecommunications companies or anybody else that wants to attach to our poles goes through a process to get authority to attach to the poles. 166 00:27:16,320 --> 00:27:20,320 We have had issues. We continue to have issues with both stub poles. 167 00:27:20,320 --> 00:27:28,320 These would be the poles that are cut off after we've moved electric lines to another pole structure. 168 00:27:28,320 --> 00:27:34,320 And then the telecommunications companies have not moved their lines over. 169 00:27:34,320 --> 00:27:44,320 We also have issues, as you mentioned, Miss Russell, with telecom drops and the boxes themselves. 170 00:27:44,320 --> 00:27:54,320 So we are we are reviewing that. I think one of the things that you approved earlier today was a vegetation management program that gives us the teeth. 171 00:27:54,320 --> 00:27:59,320 We need to go in and enforce some of the issues associated with the problem that you're describing. 172 00:27:59,320 --> 00:28:10,320 But we'll be glad to bring back to you a further detailed discussion about our what we're doing on these matters. 173 00:28:10,320 --> 00:28:16,320 Any other? All right. It is nine twenty eight. Do we have a motion to adjourn, Billy?