WEBVTT

00:00:00.000 --> 00:00:06.780
 Good afternoon and welcome to the City of Denton's Planning and Zoning Commission meeting

00:00:06.780 --> 00:00:10.520
 for Wednesday, June 14th, 2023.

00:00:10.520 --> 00:00:15.760
 This is our work session and with the quorum present, I will call us to order at 530 p.m.

00:00:15.760 --> 00:00:20.800
 First item on our work session is citizen comment on consent agenda.

00:00:20.800 --> 00:00:27.680
 I do not see anyone here for that, so we will move to clarification on tonight's agenda

00:00:27.680 --> 00:00:30.400
 for our public meeting.

00:00:30.400 --> 00:00:36.440
 So Commission, any questions on the minutes for the 24th of May?

00:00:36.440 --> 00:00:43.120
 How about on the consent agenda?

00:00:43.120 --> 00:00:44.120
 Commissioner McDade?

00:00:44.120 --> 00:00:48.120
 Yes, I just, what number is that?

00:00:48.120 --> 00:00:49.120
 B.

00:00:49.120 --> 00:00:50.120
 3B?

00:00:50.120 --> 00:00:52.880
 Yeah, I just wanted to ask Julie.

00:00:52.880 --> 00:00:56.160
 We'll get Julie up here and she can take your question.

00:00:56.160 --> 00:00:57.160
 Hi, Julie.

00:00:57.160 --> 00:01:05.500
 Let me pull up the plat so we can take a look at it.

00:01:05.500 --> 00:01:06.500
 All right.

00:01:06.500 --> 00:01:07.500
 How can I help you?

00:01:07.500 --> 00:01:15.120
 Well, okay, now, some of the residents who live in that area, they were unsure about

00:01:15.120 --> 00:01:16.760
 what was being built on that property.

00:01:16.760 --> 00:01:21.200
 I know it pretty much happened during the pandemic, so they didn't get a lot of the

00:01:21.200 --> 00:01:24.680
 information and I think this is the one they brought to me.

00:01:24.680 --> 00:01:28.080
 They weren't sure, but then when I saw the mill in Johnson, I'm thinking this is the

00:01:28.080 --> 00:01:31.960
 one they were asking about and I told them I'd try to get all the information I could.

00:01:31.960 --> 00:01:32.960
 Absolutely.

00:01:32.960 --> 00:01:37.520
 So this is a property that has a single family dwelling on it.

00:01:37.520 --> 00:01:41.480
 It's actually two lots that they're just replatting into one lot.

00:01:41.480 --> 00:01:44.840
 The single family home that is on the property will remain.

00:01:44.840 --> 00:01:53.280
 They did build an accessory structure on that second lot, and so this replat will just put

00:01:53.280 --> 00:01:58.240
 it all into one lot so that that building that was recently constructed will just be

00:01:58.240 --> 00:02:00.720
 an accessory structure to that single family home.

00:02:00.720 --> 00:02:01.720
 Okay.

00:02:01.720 --> 00:02:03.040
 Use isn't changing on the property.

00:02:03.040 --> 00:02:04.040
 All righty.

00:02:04.040 --> 00:02:05.040
 Thank you.

00:02:05.040 --> 00:02:06.040
 You bet.

00:02:06.040 --> 00:02:07.040
 Thanks, Julie.

00:02:07.040 --> 00:02:09.840
 Any other questions on consent?

00:02:09.840 --> 00:02:12.040
 Okay.

00:02:12.040 --> 00:02:14.920
 Let's move to items for individual consideration.

00:02:14.920 --> 00:02:20.160
 We've got 4A, PP230014, which belongs to Sean.

00:02:20.160 --> 00:02:22.240
 How are you, Sean?

00:02:22.240 --> 00:02:23.400
 I'm doing well.

00:02:23.400 --> 00:02:26.640
 Good evening, Chair and members of the Commission.

00:02:26.640 --> 00:02:38.880
 This is a proposed preliminary plat for the Mayhill addition, which is off Mayhill.

00:02:38.880 --> 00:02:45.440
 They do not currently meet our standards for approval, and so therefore we are recommending

00:02:45.440 --> 00:02:51.400
 denial, but I have no objection to the request of 30-day extension to June 28th.

00:02:51.400 --> 00:02:54.480
 Questions for Sean on this one?

00:02:54.480 --> 00:02:55.480
 Thank you very much.

00:02:55.480 --> 00:02:56.480
 Mm-hmm.

00:02:56.480 --> 00:02:57.480
 You staying up here for 4B?

00:02:57.480 --> 00:02:58.480
 Yes, ma'am.

00:02:58.480 --> 00:02:59.480
 Okay.

00:02:59.480 --> 00:03:00.480
 You got it.

00:03:00.480 --> 00:03:01.480
 PP230012.

00:03:01.480 --> 00:03:02.480
 Yes.

00:03:02.480 --> 00:03:09.280
 So this is a proposed preliminary plat for the Sage Creek townhomes that is near Latimore.

00:03:09.280 --> 00:03:16.080
 They are also not yet meeting our criteria, recommending denial, but perfectly happy with

00:03:16.080 --> 00:03:21.480
 the 30-day extension.

00:03:21.480 --> 00:03:22.480
 Thank you, Sean.

00:03:22.480 --> 00:03:23.480
 Appreciate it, Chair.

00:03:23.480 --> 00:03:31.720
 That'll move us to 4C, PP230013, and that is Julie's item.

00:03:31.720 --> 00:03:34.240
 Good evening, Julie Wyatt.

00:03:34.240 --> 00:03:37.960
 This is a preliminary plat for a single-family residential neighborhood.

00:03:37.960 --> 00:03:43.660
 It's a second phase of a residential development that you may remember from a few years ago.

00:03:43.660 --> 00:03:46.100
 It is on the south side of McKinney.

00:03:46.100 --> 00:03:48.200
 As I mentioned, this is just phase two of it.

00:03:48.200 --> 00:03:53.500
 It had a preliminary plat that was approved in, I believe, 2019.

00:03:53.500 --> 00:03:59.880
 It has since expired, so they're just coming back with a new preliminary plat.

00:03:59.880 --> 00:04:05.080
 Oh, we are recommending denial, sorry.

00:04:05.080 --> 00:04:06.080
 We are recommending denial.

00:04:06.080 --> 00:04:09.660
 They still have a few more things that they need to correct.

00:04:09.660 --> 00:04:14.040
 We have no objection to their requested extension to June 28th.

00:04:14.040 --> 00:04:15.040
 Okay.

00:04:15.040 --> 00:04:16.800
 Any questions for Julie?

00:04:16.800 --> 00:04:17.800
 Okay.

00:04:17.800 --> 00:04:18.800
 Thank you.

00:04:18.800 --> 00:04:19.800
 Thank you.

00:04:19.800 --> 00:04:23.000
 That'll move us to 4D.

00:04:23.000 --> 00:04:27.320
 It's PE230003, Angie.

00:04:27.320 --> 00:04:28.320
 Hi.

00:04:28.320 --> 00:04:29.320
 Good evening.

00:04:29.320 --> 00:04:31.280
 Angie Mangler, Senior Planner.

00:04:31.280 --> 00:04:38.480
 Just a second, I'm going to switch over.

00:04:38.480 --> 00:04:45.580
 This is a plat extension request for a preliminary plat for Habitat Village.

00:04:45.580 --> 00:04:52.460
 This preliminary plat was originally approved for this project in July of 2021 per the DDC.

00:04:52.460 --> 00:04:55.680
 Our preliminary plots are valid for two years.

00:04:55.680 --> 00:05:01.560
 They are working towards platting or the civil engineering plans for phase one of their development,

00:05:01.560 --> 00:05:06.840
 which includes about 18 lots of the 35 total that were proposed as part of this plan development.

00:05:06.840 --> 00:05:11.440
 However, they're not quite there yet in advance of the preliminary plat expiring.

00:05:11.440 --> 00:05:16.080
 They are requesting their plat extension, which the DDC allows the Planning and Zoning

00:05:16.080 --> 00:05:19.220
 Commission to extend for up to a year.

00:05:19.220 --> 00:05:24.400
 So staff has no objections to the requested plat extension as the applicant's been making

00:05:24.400 --> 00:05:28.320
 progress forward on this and anticipates having the final plat submitted in the next couple

00:05:28.320 --> 00:05:34.400
 months following the approval of the CEPs.

00:05:34.400 --> 00:05:37.360
 Thank you, Angie.

00:05:37.360 --> 00:05:38.360
 Thank you so much.

00:05:38.360 --> 00:05:39.360
 Thank you.

00:05:39.360 --> 00:05:40.360
 All right.

00:05:40.360 --> 00:05:44.040
 Both of our public hearings tonight have been postponed, and I was informed we're taking

00:05:44.040 --> 00:05:47.080
 no action on either one, so we won't have to open either hearing.

00:05:47.080 --> 00:05:50.160
 They'll be re-noticed when they come back to us.

00:05:50.160 --> 00:05:51.160
 Okay.

00:05:51.160 --> 00:05:56.560
 So then that will take us to our work session report, which will be receive a report, hold

00:05:56.560 --> 00:06:01.480
 a discussion regarding the implementation of the Denton 2040 Comp Plan.

00:06:01.480 --> 00:06:02.480
 Hi, Ron.

00:06:02.480 --> 00:06:03.480
 Good afternoon.

00:06:03.480 --> 00:06:04.480
 Good afternoon.

00:06:04.480 --> 00:06:05.480
 Evening.

00:06:05.480 --> 00:06:06.480
 Chair, members of the Commission.

00:06:06.480 --> 00:06:13.240
 I'll pull up the presentation real quick.

00:06:13.240 --> 00:06:21.200
 All right, Ron Megiddo, Principal Planner with Development Services, excited to be here

00:06:21.200 --> 00:06:27.720
 to share with you some of the activities and results that we have been working on towards

00:06:27.720 --> 00:06:33.160
 the implementation of the Denton 2040 Comprehensive Plan.

00:06:33.160 --> 00:06:40.640
 So as you all know, about a year ago, roughly March of 2022, the city updated their Comprehensive

00:06:40.640 --> 00:06:45.500
 Plan, and it's the Denton 2040 Comprehensive Plan, and as part of that Comprehensive Plan,

00:06:45.500 --> 00:06:47.860
 there are a number of action items.

00:06:47.860 --> 00:06:55.680
 Those action items are compiled and put together under the action plan, which is in the back

00:06:55.680 --> 00:06:57.120
 of the Comprehensive Plan.

00:06:57.120 --> 00:07:01.960
 So for those that are familiar with the Comprehensive Plan, it's in the back, and it has all of

00:07:01.960 --> 00:07:07.840
 the actions that we will be discussing or part of what we will be discussing this evening.

00:07:07.840 --> 00:07:14.760
 So in the body of the Comprehensive Plan, there are 548 actions.

00:07:14.760 --> 00:07:21.200
 Those 548 actions are then further synthesized and included in the action plan, which is

00:07:21.200 --> 00:07:26.400
 now less to 253 key actions.

00:07:26.400 --> 00:07:32.920
 So if you can imagine, basically, if there are multiple actions that have very similar

00:07:32.920 --> 00:07:40.480
 goals, they're put into smaller action groupings, and that, again, that is the 253 key actions

00:07:40.480 --> 00:07:41.480
 that we have.

00:07:41.480 --> 00:07:48.380
 Now, those 253 actions are further categorized under the elements that we have in the Comprehensive

00:07:48.380 --> 00:07:58.400
 Plan, that is the land use, the parks, mobility, infrastructure, community, and economic as

00:07:58.400 --> 00:07:59.400
 well.

00:07:59.400 --> 00:08:05.920
 So those are elements, and so, again, they're further categorized under those elements.

00:08:05.920 --> 00:08:11.340
 Those key actions are given a timeframe for when they are to be implemented.

00:08:11.340 --> 00:08:18.000
 So we try to identify which key actions should occur during the short term, which is between

00:08:18.000 --> 00:08:23.640
 now and three years, midterm, which is three to five years, and then long term beyond five

00:08:23.640 --> 00:08:24.640
 years.

00:08:24.640 --> 00:08:28.080
 But we also identify that there are some key actions that are just ongoing.

00:08:28.080 --> 00:08:32.960
 So they don't have set timeframes, but we know that they're going to be ongoing throughout

00:08:32.960 --> 00:08:36.160
 the implementation of the Comprehensive Plan.

00:08:36.160 --> 00:08:42.140
 So the action plan or the Comprehensive Plan as a whole is our framework in which the decision

00:08:42.140 --> 00:08:47.720
 making body, you guys, as an example, will use the Comprehensive Plan as the basis for

00:08:47.720 --> 00:08:56.160
 making your decisions with regards to applications, either through development, but also budgetary

00:08:56.160 --> 00:08:57.440
 ones as well for city council.

00:08:57.440 --> 00:09:03.560
 So again, the framework in which the bodies of the city use for decision making.

00:09:03.560 --> 00:09:09.960
 It also provides a task list for the departments and other entities, public entities as well,

00:09:09.960 --> 00:09:16.140
 where they use the Comprehensive Plan to use to identify what tasks are needed to be accomplished.

00:09:16.140 --> 00:09:22.360
 And so the Comprehensive Plan is a very important document, which the community uses, again,

00:09:22.360 --> 00:09:28.220
 for a lot of what we're looking to do to implement for the future of DEN.

00:09:28.220 --> 00:09:32.400
 So I use that as a background to kind of give you an idea of what we are going to be going

00:09:32.400 --> 00:09:33.400
 over.

00:09:33.400 --> 00:09:38.320
 Again, the 253 key actions is what we have.

00:09:38.320 --> 00:09:43.520
 Those 253 actions, as I listed earlier or named earlier, these are the elements.

00:09:43.520 --> 00:09:50.360
 And this table here illustrates how many key actions are included by the element.

00:09:50.360 --> 00:09:54.520
 I just wanted to point out, I'm not going to go through all of this, but just community

00:09:54.520 --> 00:09:58.400
 character has 45 key actions.

00:09:58.400 --> 00:10:02.200
 It's the highest one, and it has a lot of them under that element.

00:10:02.200 --> 00:10:06.760
 The second to that is parks, conservation, and environment.

00:10:06.760 --> 00:10:10.760
 And then following that is infrastructure and utilities, which is down here.

00:10:10.760 --> 00:10:15.120
 So I'm not to say that the other ones don't have important ones, but I just want to point

00:10:15.120 --> 00:10:21.400
 out that those are the three elements that have the most key actions in them or under

00:10:21.400 --> 00:10:24.480
 that category.

00:10:24.480 --> 00:10:27.040
 So we're going to start with land use.

00:10:27.040 --> 00:10:36.400
 And before we get to land use, in your backup, we provided to you two groupings or two lists.

00:10:36.400 --> 00:10:42.880
 The first list is the major accomplishments that the city has done since the adoption

00:10:42.880 --> 00:10:46.760
 of the update, which is, again, March of 2022.

00:10:46.760 --> 00:10:51.040
 That list is provided, I believe, as exhibit two.

00:10:51.040 --> 00:10:57.240
 And then the other list is our ongoing projects and programs that the city is working on.

00:10:57.240 --> 00:11:02.800
 And when I say city, I mean the entire city, city departments, from planning to police

00:11:02.800 --> 00:11:06.880
 to community services, everyone involved in the implementation.

00:11:06.880 --> 00:11:08.160
 And again, that's exhibit three.

00:11:08.160 --> 00:11:12.760
 So I won't go through all of them because there's a lot of those actions.

00:11:12.760 --> 00:11:18.240
 I wanted to, at this presentation, just highlight some of the major accomplishments, also some

00:11:18.240 --> 00:11:23.000
 of the ongoing projects and programs that, again, the city is working on.

00:11:23.000 --> 00:11:28.480
 So in this presentation, we will cover the major accomplishments and the ongoing programs

00:11:28.480 --> 00:11:30.480
 and projects by elements.

00:11:30.480 --> 00:11:33.560
 So the first element is land use.

00:11:33.560 --> 00:11:38.860
 So starting off with land use, this slide here illustrates the two major accomplishments

00:11:38.860 --> 00:11:41.880
 that the city accomplished since the adoption.

00:11:41.880 --> 00:11:43.400
 I'll start with the first one.

00:11:43.400 --> 00:11:49.760
 And the first one is the MUDs, which is this exhibit here that I am sure you all are familiar

00:11:49.760 --> 00:11:50.760
 with.

00:11:50.760 --> 00:11:55.760
 The city adopted a policy in which we are going to review MUDs.

00:11:55.760 --> 00:12:00.480
 So that was one of the key actions that is listed in the comprehensive plan.

00:12:00.480 --> 00:12:05.800
 And we accomplished that in October, I believe, of 2022.

00:12:05.800 --> 00:12:12.280
 In addition to the MUD policy, we also started the implementation or the creation of the

00:12:12.280 --> 00:12:15.480
 area plans that, again, was in our comprehensive plan.

00:12:15.480 --> 00:12:22.960
 One of the major implementation strategies that we identified early in the update.

00:12:22.960 --> 00:12:29.880
 So you see that we have three that we are looking at in the city council on April, I

00:12:29.880 --> 00:12:36.800
 believe, of 2022, prioritized the three that you see up here, and those are the northeast,

00:12:36.800 --> 00:12:40.840
 the southeast, and the downtown plan update.

00:12:40.840 --> 00:12:48.720
 In regards to where they are currently, that is, the northeast is probably halfway through

00:12:48.720 --> 00:12:49.720
 the process.

00:12:49.720 --> 00:12:54.120
 We are in phase three of the process of creating the area plan.

00:12:54.120 --> 00:12:55.360
 Southeast just got started.

00:12:55.360 --> 00:12:59.560
 So they are in the initial stage of public engagement and public input.

00:12:59.560 --> 00:13:01.840
 For downtown, we have not yet started that.

00:13:01.840 --> 00:13:03.080
 That is coming up.

00:13:03.080 --> 00:13:09.440
 In fact, the contract for that consultant to help with the downtown is set later this

00:13:09.440 --> 00:13:10.440
 month.

00:13:10.440 --> 00:13:15.400
 So hopefully when that occurs, we will then start the update of the downtown, which will

00:13:15.400 --> 00:13:21.640
 go through the year up to, I believe, May is when we are looking at the actual completion

00:13:21.640 --> 00:13:22.640
 of that.

00:13:22.640 --> 00:13:27.800
 So there is a lot of work associated with that, as well as the others.

00:13:27.800 --> 00:13:34.360
 You can see that the implementation of the comprehensive plan involves the creation of

00:13:34.360 --> 00:13:38.540
 these area plans and others.

00:13:38.540 --> 00:13:40.920
 This list here, I won't go through all of them.

00:13:40.920 --> 00:13:46.440
 I already kind of mentioned the major accomplishments with regards to number two and three under

00:13:46.440 --> 00:13:48.060
 major accomplishments.

00:13:48.060 --> 00:13:56.560
 We also did a code amendment as well earlier of the previous year in which we amended the

00:13:56.560 --> 00:13:59.760
 public own and manage drills section of the code.

00:13:59.760 --> 00:14:01.980
 Again, that is a major accomplishment.

00:14:01.980 --> 00:14:06.480
 The list below that are the projects and programs that we are currently working on.

00:14:06.480 --> 00:14:10.300
 And again, I won't go through all of them, but again, we have highlighted some already

00:14:10.300 --> 00:14:13.620
 with the update to the downtown master plan.

00:14:13.620 --> 00:14:18.380
 The creation of the northeast and southeast area plans.

00:14:18.380 --> 00:14:23.640
 We continue to work and coordinate with other departments in relationship to the development

00:14:23.640 --> 00:14:29.820
 of the city in terms of land use applications and so forth.

00:14:29.820 --> 00:14:38.440
 So there is a lot going on with the implementation in relationship to the land use element.

00:14:38.440 --> 00:14:42.540
 The next element is the fiscal and economic vitality.

00:14:42.540 --> 00:14:48.500
 I highlighted here the economic development strategic plan which is what our economic development

00:14:48.500 --> 00:14:55.300
 department is using in terms of implementing certain programs and projects.

00:14:55.300 --> 00:15:02.320
 The logos that you see to the right are our partners in this effort with the economic

00:15:02.320 --> 00:15:07.220
 development partnership, the den chamber of commerce as well as discovered den all play

00:15:07.220 --> 00:15:14.480
 an integral part in implementing the actions that are within the den 2040 comprehensive

00:15:14.480 --> 00:15:15.480
 plan.

00:15:15.480 --> 00:15:21.060
 And again, a lot of the information or key actions that are listed relate back to these

00:15:21.060 --> 00:15:26.660
 individual groups, but also as it relates to the implementation or the work that is

00:15:26.660 --> 00:15:32.940
 being done under the economic development strategic plan.

00:15:32.940 --> 00:15:38.460
 All of the accomplishments I wanted to highlight is the first is the establishment of the physical

00:15:38.460 --> 00:15:39.740
 impact analysis tool.

00:15:39.740 --> 00:15:45.060
 I think this is something that the city wanted to have and I know that some of you may have

00:15:45.060 --> 00:15:47.300
 already seen some of them.

00:15:47.300 --> 00:15:53.020
 This tool was just created and we're using it as a way of providing additional information

00:15:53.020 --> 00:15:57.260
 and data as you guys look over certain applications.

00:15:57.260 --> 00:16:05.900
 SUP zoning cases, PDs, you'll see that there is an exhibit that provides the physical impact

00:16:05.900 --> 00:16:13.400
 analysis results and that is again something that we implemented in 2022.

00:16:13.400 --> 00:16:19.260
 Also completion of roadway funding strategy between the capital improvements, sorry capital

00:16:19.260 --> 00:16:26.060
 projects and our finance department, they've developed the funding strategy in which they

00:16:26.060 --> 00:16:31.460
 are looking at how to fund a lot of the work that is being done for the next 40 years,

00:16:31.460 --> 00:16:39.100
 so that has been done and that is being applied in all the work that's being done under public

00:16:39.100 --> 00:16:41.980
 works and capital projects.

00:16:41.980 --> 00:16:46.260
 So in terms of the other projects and programs that the city is working on, again I won't

00:16:46.260 --> 00:16:50.540
 go through all of them, but I just wanted to list those that are listed here that provide

00:16:50.540 --> 00:16:56.900
 a little bit more detail, I think I would probably want to focus on the promotion of

00:16:56.900 --> 00:17:02.340
 historic preservation, I think we always think of historic preservation as obviously preserving

00:17:02.340 --> 00:17:06.940
 our historical resources, but it's also a form of economic development.

00:17:06.940 --> 00:17:15.100
 So with Cameron's help in working with economic development, there's a lot of activities related

00:17:15.100 --> 00:17:20.700
 to some of the key actions that are in the comprehensive plan that they're working towards

00:17:20.700 --> 00:17:21.780
 implementing.

00:17:21.780 --> 00:17:28.260
 I know that Cameron's work includes a couple of things and I think we'll highlight it in

00:17:28.260 --> 00:17:35.720
 the next chapter or element, but I know that working with the downtown and the preservation

00:17:35.720 --> 00:17:42.220
 of those buildings as well as the historic districts, all of which help in our efforts

00:17:42.220 --> 00:17:46.360
 to strengthen the city's economy.

00:17:46.360 --> 00:17:55.180
 Some of the other things I'd like to focus on as well is the utilization of catalyst

00:17:55.180 --> 00:18:01.860
 fund for those that are not familiar, our director Wayne Emerson is working on this

00:18:01.860 --> 00:18:08.700
 catalyst fund, it's a way of having funds available for promotion but also ways of incentivizing

00:18:08.700 --> 00:18:13.100
 some of the strategies that they're using again under the strategic plan that they have,

00:18:13.100 --> 00:18:18.780
 so that's something that's just started, so again, work being done again ultimately to

00:18:18.780 --> 00:18:22.940
 help implement the key actions that are in our comprehensive plan.

00:18:22.940 --> 00:18:27.900
 Community capture, so this is where I- Ron, hang on just a second please.

00:18:27.900 --> 00:18:28.900
 Sure.

00:18:28.900 --> 00:18:29.900
 Commissioner Anderson.

00:18:29.900 --> 00:18:31.380
 I have a quick question, thank you Chair.

00:18:31.380 --> 00:18:35.980
 About the roads, you said that there's money been set aside for certain roads, is that

00:18:35.980 --> 00:18:36.980
 right?

00:18:36.980 --> 00:18:42.540
 The roadway funding strategy, you said they've allocated funds or something like that?

00:18:42.540 --> 00:18:53.420
 Oh yes, so all of the fundings that our capital projects has, they have funding through bond

00:18:53.420 --> 00:19:01.020
 packages and those sorts, there's a strategy in which how they are allocated and funded.

00:19:01.020 --> 00:19:05.020
 Can you tell me when they're going to fix South Locust and South town?

00:19:05.020 --> 00:19:08.180
 You're talking about bringing businesses- I drive there every day.

00:19:08.180 --> 00:19:09.180
 And economic development.

00:19:09.180 --> 00:19:10.180
 It's horrible.

00:19:10.180 --> 00:19:11.180
 It is horrible.

00:19:11.180 --> 00:19:12.180
 And Eagle, let's add Eagle to that.

00:19:12.180 --> 00:19:15.660
 I have friends in Lantana, I have friends in South Denton, they won't come into Denton

00:19:15.660 --> 00:19:17.220
 because the streets are horrible.

00:19:17.220 --> 00:19:19.340
 Well, we're probably getting off topic here.

00:19:19.340 --> 00:19:23.260
 No, no, I just didn't know if that's part of the strategic funding.

00:19:23.260 --> 00:19:25.420
 That's actually an easier question.

00:19:25.420 --> 00:19:29.540
 It's a great question, those are text out roadways and we do have a plan in place and

00:19:29.540 --> 00:19:33.140
 working with them to eventually have those turned over to the city, but we're working

00:19:33.140 --> 00:19:39.180
 with text out on that, but this is, this complete roadway funding strategy was, if members source

00:19:39.180 --> 00:19:43.620
 were correctly, as Ron pointed, related to all the available sources of funding that

00:19:43.620 --> 00:19:48.700
 the city may have as it relates to roadway improvements and in text out may have been

00:19:48.700 --> 00:19:52.220
 part of that conversation because we do have a fair amount of text out roadways within

00:19:52.220 --> 00:19:58.220
 our community, but that also was to really to receive direction from council on the various

00:19:58.220 --> 00:20:03.900
 funding sources that we could apply towards roadway construction.

00:20:03.900 --> 00:20:04.900
 Great question.

00:20:04.900 --> 00:20:05.900
 Great question.

00:20:05.900 --> 00:20:10.900
 I wish I had an answer for you.

00:20:10.900 --> 00:20:11.900
 Okay.

00:20:11.900 --> 00:20:18.380
 So next element is community character and part of that community character is, again,

00:20:18.380 --> 00:20:24.340
 our historic resources and the slide here that I provided, just going to highlight some

00:20:24.340 --> 00:20:30.700
 of the things that the city's working towards, I know that again, Cameron is helping with

00:20:30.700 --> 00:20:35.140
 a lot of the historic preservation actions.

00:20:35.140 --> 00:20:41.340
 She's actually created an Instagram webpage.

00:20:41.340 --> 00:20:47.380
 There's the Den Historic Preservation Plan that we're working on as well.

00:20:47.380 --> 00:20:53.080
 Street sign toppers was a major accomplishment this past year.

00:20:53.080 --> 00:20:57.780
 So that's in place and so we're actually working on that.

00:20:57.780 --> 00:21:06.540
 And then overall, just the city in downtown in general, ensuring that we have the music

00:21:06.540 --> 00:21:13.540
 and arts events continue and we hope that we can promote more and that we can, again,

00:21:13.540 --> 00:21:16.820
 bring more folks to downtown, hopefully they can get here.

00:21:16.820 --> 00:21:22.180
 But that's something that we have a lot towards and again, community character is one of those

00:21:22.180 --> 00:21:29.060
 elements that has a lot of key actions and that reflects on what you see here.

00:21:29.060 --> 00:21:33.060
 You see a lot of programs and projects that are being worked on.

00:21:33.060 --> 00:21:37.860
 Not a whole lot of major accomplishments to date, but I'm sure that in the next coming

00:21:37.860 --> 00:21:43.180
 years we'll see more and more of those key actions implemented or accomplished.

00:21:43.180 --> 00:21:45.180
 But again, we have a lot going on.

00:21:45.180 --> 00:21:50.300
 The Parks Department has a lot going on in terms of community character, of course.

00:21:50.300 --> 00:21:56.660
 They're the individuals that are working on a lot of the public amenities or infrastructure

00:21:56.660 --> 00:21:57.660
 that we have.

00:21:57.660 --> 00:22:02.900
 So you see they're listed here a number of times.

00:22:02.900 --> 00:22:09.500
 And I think if I were to highlight some of the major, you know, progress programs that

00:22:09.500 --> 00:22:14.300
 are in progress that is, is basically what the parks is doing.

00:22:14.300 --> 00:22:20.020
 I attended a parks board meeting not too long ago and they shared with the board some of

00:22:20.020 --> 00:22:23.380
 the projects that they're working on and some of the programs they're working on.

00:22:23.380 --> 00:22:25.780
 And it was a 60 slide presentation.

00:22:25.780 --> 00:22:33.780
 So they have a lot going on between park master planning, between installing public art, that's

00:22:33.780 --> 00:22:42.900
 under the Parks Department, acquiring additional park land, preserving, you know, natural areas,

00:22:42.900 --> 00:22:50.460
 working with the CIP individuals to make sure that, you know, their trails and park system

00:22:50.460 --> 00:22:54.780
 is in line with some of the developments that's going on but also with the city projects.

00:22:54.780 --> 00:22:59.820
 So the Parks Department is very busy and have a lot to do with community character.

00:22:59.820 --> 00:23:02.980
 So again, the list is long.

00:23:02.980 --> 00:23:07.980
 The further detailed information is in the backup to all of these different categories

00:23:07.980 --> 00:23:09.540
 or these different key actions.

00:23:09.540 --> 00:23:14.180
 So hopefully you have an opportunity to read that because it goes a little bit more into

00:23:14.180 --> 00:23:21.100
 detail as to what they're doing in their efforts to implement those key actions.

00:23:21.100 --> 00:23:28.180
 All right, I talked about parks and conservation, obviously they're part of the community character

00:23:28.180 --> 00:23:38.380
 but they also provide parks conservation and environment as well, efforts in that key actions.

00:23:38.380 --> 00:23:44.260
 So the ones that I showed here, just to highlight some of the actions that they're working on,

00:23:44.260 --> 00:23:51.980
 obviously the continuing preservation of key areas, either be it's natural heritage or

00:23:51.980 --> 00:24:00.540
 natural resources or wildlife or other, you know, landscaping preservation as well.

00:24:00.540 --> 00:24:04.760
 But we also have existing parks that they also have to maintain.

00:24:04.760 --> 00:24:11.900
 So I showed a picture of Quaker Town and the Flash Park here which they also actually maintain.

00:24:11.900 --> 00:24:17.500
 So a lot of the acquiring of new parks but also maintaining of existing parks as well

00:24:17.500 --> 00:24:23.980
 is part of their day-to-day and ultimately part of this comprehensive plan.

00:24:23.980 --> 00:24:28.100
 The map to the right just illustrates where those city parks are located throughout the

00:24:28.100 --> 00:24:32.580
 city of Denton.

00:24:32.580 --> 00:24:37.580
 So one of the major accomplishments is the update to the Parks Recreation and Trail System

00:24:37.580 --> 00:24:43.140
 Master Plan that was done in early March of 2022.

00:24:43.140 --> 00:24:47.940
 And then the list that you see here provide all the different actions or summary of those

00:24:47.940 --> 00:24:49.740
 actions that they're working on.

00:24:49.740 --> 00:24:54.600
 And one of the things that I want to highlight is the protection of agriculture land and

00:24:54.600 --> 00:24:59.260
 heritage ranch lands as well as any natural features.

00:24:59.260 --> 00:25:03.340
 I know that the Parks Department when I was at the Parks Board talked about acquiring

00:25:03.340 --> 00:25:09.220
 property throughout the city, not just one area and preserving that for future use for

00:25:09.220 --> 00:25:10.380
 recreation.

00:25:10.380 --> 00:25:13.300
 So they have funds in which to do that.

00:25:13.300 --> 00:25:17.060
 Not a lot but enough to be able to acquire some land.

00:25:17.060 --> 00:25:20.180
 I know that they recently purchased some land to the north of the city.

00:25:20.180 --> 00:25:28.140
 So as part of their ultimate effort in creating a regional park system in which we have multiple

00:25:28.140 --> 00:25:32.220
 parks that are connected by natural trails.

00:25:32.220 --> 00:25:36.140
 Yeah, parks are doing a lot of stuff.

00:25:36.140 --> 00:25:42.340
 So again, the list that you have in the backup has again a little bit more detail into what

00:25:42.340 --> 00:25:43.860
 they're working on.

00:25:43.860 --> 00:25:49.020
 But if you have any questions, please let me know and I'll certainly try to answer those

00:25:49.020 --> 00:25:50.020
 questions.

00:25:50.020 --> 00:25:51.020
 Mobility.

00:25:51.020 --> 00:25:57.220
 So this is a really important one I think to me after land use mobility is probably one

00:25:57.220 --> 00:26:01.700
 of the biggest element in the comprehensive plan.

00:26:01.700 --> 00:26:09.780
 This is in the exhibits or these graphics here, infographics are from the then 2020 mobility

00:26:09.780 --> 00:26:10.780
 2022.

00:26:10.780 --> 00:26:12.700
 Sorry, mobility plan.

00:26:12.700 --> 00:26:17.300
 And you can see that we'll start with bicycle infrastructure per the plan.

00:26:17.300 --> 00:26:27.140
 There are 24.4 miles of trails, 15.3 of shared roadways, 9.3 miles of bike lanes.

00:26:27.140 --> 00:26:31.900
 And then there's urban shoulders which is 2.5 miles and then side paths.

00:26:31.900 --> 00:26:36.460
 And I think side path is one of those new terms that you probably haven't heard.

00:26:36.460 --> 00:26:38.780
 I think that's something that we'll see more and more.

00:26:38.780 --> 00:26:46.220
 I know that our parks department as well as our CIP and our transportation planning staff

00:26:46.220 --> 00:26:51.980
 is looking to extend or add more side paths as part of new developments that come in.

00:26:51.980 --> 00:26:58.220
 So our bicycle infrastructure is a lot and one of the main things from the comprehensive

00:26:58.220 --> 00:27:02.020
 plan is to increase that even more than what we have today.

00:27:02.020 --> 00:27:07.780
 So those will come as development comes in but we can also be proactive in identifying

00:27:07.780 --> 00:27:12.300
 areas that we can add more where it makes sense.

00:27:12.300 --> 00:27:19.500
 In terms of pedestrian infrastructure, we have 451 miles of sidewalks.

00:27:19.500 --> 00:27:25.900
 Some of them are better than others but we definitely have those that we need to help

00:27:25.900 --> 00:27:29.420
 maintain but we also look to create more.

00:27:29.420 --> 00:27:35.740
 So that's something that this comprehensive plan speaks to and this is what the den 2022

00:27:35.740 --> 00:27:42.080
 mobility plan also speaks to and hopefully we can add that to our system.

00:27:42.080 --> 00:27:47.620
 Daily migration, I thought this was a really cool infographic, shows that almost the same

00:27:47.620 --> 00:27:50.300
 amount of people coming in is leaving.

00:27:50.300 --> 00:27:56.220
 So that was an interesting number to see and then we have folks that just live and work

00:27:56.220 --> 00:28:02.660
 in den which is I think important as well.

00:28:02.660 --> 00:28:11.300
 In terms of the mobility major accomplishments, we continue to update our transportation criteria

00:28:11.300 --> 00:28:16.660
 manual and other criteria manuals to include.

00:28:16.660 --> 00:28:23.000
 We conducted a citywide speed study and that is exciting because after the speed study

00:28:23.000 --> 00:28:31.500
 was adopted and approved, the city department, I'm trying to think of the department, I won't

00:28:31.500 --> 00:28:36.980
 say streets but the department in charge of street signs updated the street, I'm sorry,

00:28:36.980 --> 00:28:43.820
 the speed limit signs and I believe the number is 193 signs in total and they're also continuing

00:28:43.820 --> 00:28:51.020
 to add more or work to add more of those updates working with Tech Start as well and getting

00:28:51.020 --> 00:28:56.580
 those street signs, sorry, speed limit signs updated and ultimately as development comes

00:28:56.580 --> 00:29:01.060
 in we will make sure that those signs are reflected as well per the speed study.

00:29:01.060 --> 00:29:06.260
 So again, that's an exciting one that was done last year.

00:29:06.260 --> 00:29:12.340
 In terms of other projects and programs that are ongoing, again, we talked about or I briefly

00:29:12.340 --> 00:29:16.180
 discussed that pedestrian, bicycle and transit infrastructure.

00:29:16.180 --> 00:29:21.060
 We hope to increase more and more as we continue to develop and grow as a city so that is part

00:29:21.060 --> 00:29:25.620
 of what we will be or we are doing and will be doing in the future.

00:29:25.620 --> 00:29:30.340
 I'm trying to think of another one here.

00:29:30.340 --> 00:29:35.260
 I think this is a good one too, number seven is expand electric vehicle fleet and infrastructure.

00:29:35.260 --> 00:29:40.260
 I know the city is looking at our fleet trucks and see there's ways that we can increase

00:29:40.260 --> 00:29:42.780
 the number of electric vehicle.

00:29:42.780 --> 00:29:50.260
 In terms of electric infrastructure, I know that in downtown there is a few electric vehicle

00:29:50.260 --> 00:29:51.800
 charging stations.

00:29:51.800 --> 00:29:57.260
 We certainly want to see more but we also have some over at Razor Ranch as well as at

00:29:57.260 --> 00:29:58.260
 Buc-E's.

00:29:58.260 --> 00:30:02.020
 I didn't know Buc-E's had some but apparently there are some electric charged vehicle stations

00:30:02.020 --> 00:30:05.080
 at Buc-E's as well.

00:30:05.080 --> 00:30:06.080
 Any questions on mobility?

00:30:06.080 --> 00:30:07.080
 Commissioner Prudt.

00:30:07.080 --> 00:30:08.580
 Thank you, Chair.

00:30:08.580 --> 00:30:15.800
 Just real quick, I know we've had challenges in staffing and everything with Vision Zero

00:30:15.800 --> 00:30:20.320
 moving forward.

00:30:20.320 --> 00:30:27.740
 Do we envision future updates like this having some KPIs from that Vision Zero study and

00:30:27.740 --> 00:30:33.540
 being able to track how the safety goals are being accomplished or not?

00:30:33.540 --> 00:30:37.460
 I know that phase one is completed and there's a phase two and I'm looking to Tina to help

00:30:37.460 --> 00:30:39.220
 me with that question.

00:30:39.220 --> 00:30:40.220
 Right.

00:30:40.220 --> 00:30:42.620
 So we have funded phase two.

00:30:42.620 --> 00:30:46.940
 We have been delayed getting that started just because we've been trying to help supplement

00:30:46.940 --> 00:30:48.500
 our transportation planning staff.

00:30:48.500 --> 00:30:50.940
 So we're making some good headway on that.

00:30:50.940 --> 00:30:51.980
 I'm happy to report.

00:30:51.980 --> 00:30:56.660
 So hopefully we'll have some additional staff members next month that will be able to help

00:30:56.660 --> 00:30:58.220
 supplement our efforts.

00:30:58.220 --> 00:31:01.400
 But as it relates to Vision Zero, that's one of the key things that we need to move forward

00:31:01.400 --> 00:31:03.440
 on developing that phase two action plan.

00:31:03.440 --> 00:31:07.320
 I would anticipate as part of that action plan that there will probably be some key performance

00:31:07.320 --> 00:31:12.460
 indicators that would be included within that to be able to help be able to understand from

00:31:12.460 --> 00:31:17.620
 a data standpoint, are we getting closer to our goal of zero fatalities or significant

00:31:17.620 --> 00:31:19.380
 injuries associated with that?

00:31:19.380 --> 00:31:20.380
 Okay.

00:31:20.380 --> 00:31:21.380
 Thank you.

00:31:21.380 --> 00:31:22.380
 You're welcome.

00:31:22.380 --> 00:31:23.380
 Great question.

00:31:23.380 --> 00:31:24.380
 Okay.

00:31:24.380 --> 00:31:25.380
 Thanks.

00:31:25.380 --> 00:31:31.220
 Housing and neighborhoods, again, another important element.

00:31:31.220 --> 00:31:36.060
 This slide just helps illustrate some of the major things that we're working on or have

00:31:36.060 --> 00:31:37.940
 accomplished.

00:31:37.940 --> 00:31:43.740
 The affordable housing strategic toolkit is one that I know our community services department

00:31:43.740 --> 00:31:49.500
 is working on and we'll be seeing some of what they're working on in the next, hopefully

00:31:49.500 --> 00:31:51.740
 next couple of months.

00:31:51.740 --> 00:31:56.680
 Of course, the famous illustration that I think everybody has seen already, the missing

00:31:56.680 --> 00:32:03.100
 middle housing, our big strategic, I'm sorry, our big key action in the comprehensive plan

00:32:03.100 --> 00:32:11.460
 is to increase our housing options, increase our housing types.

00:32:11.460 --> 00:32:19.020
 That is something that you'll see in the comprehensive plan and you'll see as part of the key actions

00:32:19.020 --> 00:32:26.180
 is to make sure that we provide those types of housing as well as those options available

00:32:26.180 --> 00:32:28.220
 to our community.

00:32:28.220 --> 00:32:35.900
 The other two illustrates here is a sample of what tiny homes could be, so just another

00:32:35.900 --> 00:32:38.820
 example of another option.

00:32:38.820 --> 00:32:45.300
 This photo over here is a model home over at Eagle Creek, that's a division just south

00:32:45.300 --> 00:32:46.300
 of I-35.

00:32:46.300 --> 00:32:52.740
 I thought it was a good representation of some of the housing that we're seeing.

00:32:52.740 --> 00:32:59.380
 So in Den, obviously you all know that the city's growing, the housing demand is high

00:32:59.380 --> 00:33:03.500
 not only for the DFW but for this city as well.

00:33:03.500 --> 00:33:10.300
 Our comprehensive plan looks to add or is projecting to add roughly 37,000 more housing

00:33:10.300 --> 00:33:12.460
 by 2040.

00:33:12.460 --> 00:33:18.360
 I think with some of the big developments like coal and hunter, I think that can be

00:33:18.360 --> 00:33:23.460
 quickly done but there's still obviously other areas of the city that we're seeing growth

00:33:23.460 --> 00:33:24.600
 and housing as well.

00:33:24.600 --> 00:33:33.160
 So again, housing in neighborhoods, some of the major accomplishments again is expanding

00:33:33.160 --> 00:33:34.340
 our housing options.

00:33:34.340 --> 00:33:44.700
 I know in the year 2022 we approved roughly close to 1,400 permits for housing and those

00:33:44.700 --> 00:33:50.860
 range again from single family, there are some duplexes but mainly single family and

00:33:50.860 --> 00:33:54.340
 those range in different sizes.

00:33:54.340 --> 00:33:59.620
 Expand the availability of affordable housing, again with the affordable strategic toolkit

00:33:59.620 --> 00:34:01.740
 that community services are working on.

00:34:01.740 --> 00:34:08.780
 There are a number of examples that they're hoping to accomplish and so I know with multifamily

00:34:08.780 --> 00:34:14.140
 I believe that number is around, I want to say there's 12 permits that were approved

00:34:14.140 --> 00:34:19.700
 but 2,600 units associated with those 12 permits from what I recall.

00:34:19.700 --> 00:34:25.760
 So again, housing is, we're continuing to see more housing develop but I think part

00:34:25.760 --> 00:34:32.660
 of what we would like to see also is the types and the additional options that are available

00:34:32.660 --> 00:34:36.260
 is expanded even more.

00:34:36.260 --> 00:34:43.140
 In terms of the projects that are being worked on, you know, meeting the demands and diversity

00:34:43.140 --> 00:34:48.340
 of housing choices, community services, I mentioned that, they're working on that as

00:34:48.340 --> 00:34:51.420
 part of their strategic plan.

00:34:51.420 --> 00:34:57.020
 As far as the other, establish a rental housing and multifamily inspection and registration

00:34:57.020 --> 00:35:02.340
 program, I know some of that has started but part of that has not yet started so I believe

00:35:02.340 --> 00:35:08.780
 the rental housing inspection has started but the registration program has not.

00:35:08.780 --> 00:35:12.060
 But again, that's something that community services is working on.

00:35:12.060 --> 00:35:18.500
 In addition, they are also working on the, addressing the needs for DEN's homeless population

00:35:18.500 --> 00:35:25.820
 as well in a number of key tasks.

00:35:25.820 --> 00:35:31.940
 Community health services and safety and services that is, I provided these photos here to kind

00:35:31.940 --> 00:35:36.140
 of give you an idea of what we have been doing as a city.

00:35:36.140 --> 00:35:44.020
 I'll start over here, the top left, and that is the DEN police substation on vintage.

00:35:44.020 --> 00:35:47.860
 Hopefully some of you may have driven by it, I've seen it.

00:35:47.860 --> 00:35:54.980
 That was recently opened, I believe it was April of this year.

00:35:54.980 --> 00:36:00.820
 This is the, I'm going to blank on this one, I remember the name but it's on loop 288 is

00:36:00.820 --> 00:36:07.180
 the homeless, maybe it's not the homeless.

00:36:07.180 --> 00:36:14.580
 It's not our daily bread, it's called something else and I apologize, let me see if I.

00:36:14.580 --> 00:36:18.460
 It's a city facility that assists people with needs and housing, I don't have the exact

00:36:18.460 --> 00:36:22.580
 name but it is in partnership with our daily bread, they provide support.

00:36:22.580 --> 00:36:23.580
 That's right, okay.

00:36:23.580 --> 00:36:26.580
 When I find it, I'll let you all know.

00:36:26.580 --> 00:36:32.220
 So yeah, that one just was late 2022, so that opened up and again, that's a great addition

00:36:32.220 --> 00:36:38.940
 to the city and again, assisting our community that are in need.

00:36:38.940 --> 00:36:44.420
 The bottom left here, just to just illustrate that our parks department is working on expanding

00:36:44.420 --> 00:36:49.100
 the program of community gardens throughout the city.

00:36:49.100 --> 00:36:53.860
 Bowling Green is another area that has a community garden, but Child Field is also part of that

00:36:53.860 --> 00:37:02.100
 and part of the parks department's effort is also to help expand the use of community

00:37:02.100 --> 00:37:04.300
 gardens throughout the city of Den.

00:37:04.300 --> 00:37:10.460
 And then the bottom right here has not been built yet, or it's being built as we speak.

00:37:10.460 --> 00:37:17.220
 It's the, let me ask a question, what number is our next fire station?

00:37:17.220 --> 00:37:18.220
 Does anybody know?

00:37:18.220 --> 00:37:20.500
 Is it number eight?

00:37:20.500 --> 00:37:21.500
 No?

00:37:21.500 --> 00:37:22.500
 Close.

00:37:22.500 --> 00:37:23.500
 Is it nine?

00:37:23.500 --> 00:37:24.500
 Okay.

00:37:24.500 --> 00:37:33.220
 So number nine will be our, yeah, okay, there's no prize.

00:37:33.220 --> 00:37:38.240
 Yeah, no prize, no prize.

00:37:38.240 --> 00:37:43.220
 It's located at the Den Municipal Airport, Enterprise Airport, so that'll be exciting

00:37:43.220 --> 00:37:44.220
 to have one there.

00:37:44.220 --> 00:37:48.820
 Obviously, that's going to increase the protection of that area in terms of fire, but also have

00:37:48.820 --> 00:37:53.460
 it available for the airport if for whatever reason there is a need.

00:37:53.460 --> 00:37:58.160
 But that is scheduled to be completed in May or April or May of 2024.

00:37:58.160 --> 00:38:01.820
 So I know they're working hard to get them, and it's right next to the terminal.

00:38:01.820 --> 00:38:06.940
 So it's a great location and central to the airport area.

00:38:06.940 --> 00:38:10.500
 It's called Denton's Community Shelter, operated by Our Daily Bread.

00:38:10.500 --> 00:38:11.500
 Great.

00:38:11.500 --> 00:38:12.720
 Thank you.

00:38:12.720 --> 00:38:15.180
 Thank you, Dina.

00:38:15.180 --> 00:38:20.660
 As far as community health safety, we do have a lot under major accomplishments.

00:38:20.660 --> 00:38:27.780
 Obviously, the police and fire have received a number of accreditation, accreditation,

00:38:27.780 --> 00:38:28.780
 accreditation, sorry.

00:38:28.780 --> 00:38:30.620
 Yeah, there you go.

00:38:30.620 --> 00:38:37.180
 Also, we talked about the services at Loop 288 that Tina just referenced.

00:38:37.180 --> 00:38:39.020
 So that was accomplished.

00:38:39.020 --> 00:38:40.980
 That's a major accomplishment.

00:38:40.980 --> 00:38:47.540
 As far as projects and programs currently in progress, we have a number of activities.

00:38:47.540 --> 00:38:53.020
 We talked about the gardens, community gardens, but also overall is really just making sure

00:38:53.020 --> 00:38:58.860
 that our public service departments are being able to do what they do.

00:38:58.860 --> 00:39:06.780
 And so they're continuing to make efforts to make sure that their services are available

00:39:06.780 --> 00:39:13.500
 and within the framework of what needs to be done in terms of federal and state standards.

00:39:13.500 --> 00:39:18.740
 So look, they're going.

00:39:18.740 --> 00:39:20.780
 Infrastructure and utilities, this is the last element.

00:39:20.780 --> 00:39:24.780
 So after this, we'll be done.

00:39:24.780 --> 00:39:29.460
 So I wanted to share some of the major road work.

00:39:29.460 --> 00:39:32.380
 Now there are a number of other road works throughout the city.

00:39:32.380 --> 00:39:38.540
 And I encourage you to go to our city website under Improving Den and you'll see that there's

00:39:38.540 --> 00:39:43.860
 a number of projects that the city is working on, not just the big projects like this, but

00:39:43.860 --> 00:39:48.060
 also neighborhood projects throughout the city as well.

00:39:48.060 --> 00:39:51.940
 So the first one is the Mayhill Road phase two.

00:39:51.940 --> 00:39:59.380
 And for those that aren't familiar, phase one is basically between US 380 and just south

00:39:59.380 --> 00:40:00.380
 of Spencer.

00:40:00.380 --> 00:40:03.140
 So the landfill is off of this photo.

00:40:03.140 --> 00:40:08.340
 So the landfill is over here and phase one ends roughly around here.

00:40:08.340 --> 00:40:18.620
 Phase two is going to be the construction of a Mayhill extending over the railroad tracks

00:40:18.620 --> 00:40:24.820
 and then down and then reconnecting to where, again, the existing phase one completion is

00:40:24.820 --> 00:40:25.820
 located.

00:40:25.820 --> 00:40:26.820
 So this is phase two.

00:40:26.820 --> 00:40:32.020
 So this segment between where it currently ends here is just south of Spencer all the

00:40:32.020 --> 00:40:37.820
 way through, I want to say Colorado, but I think they may extend all the way to I-35,

00:40:37.820 --> 00:40:39.540
 but that might be a different project.

00:40:39.540 --> 00:40:43.460
 But this project right here that you're seeing here is phase two.

00:40:43.460 --> 00:40:51.740
 So again, that area where it currently is a four-way stop, no, a three-way stop, extends

00:40:51.740 --> 00:40:58.400
 over again the railroad tracks and then again realigns back to the main Mayhill look alignment,

00:40:58.400 --> 00:40:59.400
 that is phase two.

00:40:59.400 --> 00:41:02.860
 So that is something that is upcoming and that is something that is being worked on

00:41:02.860 --> 00:41:04.980
 as we speak.

00:41:04.980 --> 00:41:13.100
 The other area that's on this side here which is will be the old Mayhill will be part of

00:41:13.100 --> 00:41:18.900
 phase three and that will come in soon after phase two or right around the same time.

00:41:18.900 --> 00:41:25.700
 So again, just to illustrate where that is, what is happening along this part of the city.

00:41:25.700 --> 00:41:30.780
 The other part of the city is the Bonnie Bray widening project.

00:41:30.780 --> 00:41:37.380
 Currently the phase one and two is complete, so the area here on Vintage and the part of

00:41:37.380 --> 00:41:42.380
 Bonnie Bray through this area here, I think that was either Rose Lawn Drive, yeah, that's

00:41:42.380 --> 00:41:46.940
 Rose Lawn Drive, that is where phase one and that is completed.

00:41:46.940 --> 00:41:50.420
 Phase three and four, five and six are forthcoming.

00:41:50.420 --> 00:41:56.900
 I know that the design and work on phase three is being drafted or being completed as we

00:41:56.900 --> 00:42:05.020
 speak, so that will be the next phase for the capital projects team.

00:42:05.020 --> 00:42:10.940
 Some of the major accomplishments include the work that the city as well as the county

00:42:10.940 --> 00:42:18.660
 is doing in terms of roadway work, also the continuing road work widening, I talked about

00:42:18.660 --> 00:42:25.500
 Bonnie Bray, I talked about Mayhill, Mayhill, the phase one that is, so that is all done.

00:42:25.500 --> 00:42:30.740
 There are other capital projects that the city is working on, again, those are all provided

00:42:30.740 --> 00:42:37.260
 under Improving Den, so that's a really good website to visit if you want to learn more

00:42:37.260 --> 00:42:42.660
 about what's going on in terms of roadway widening projects.

00:42:42.660 --> 00:42:47.300
 In terms of the other projects and programs that are currently being worked on, I know

00:42:47.300 --> 00:42:53.240
 that I'm just going to pick a few here, street lighting standards, D&E will be bringing forward

00:42:53.240 --> 00:43:00.420
 some of that recommendations to the DCRC and ultimately to PNZ and City Council.

00:43:00.420 --> 00:43:07.740
 I know our water and waste water folks are working on master plans as we speak, the water

00:43:07.740 --> 00:43:13.020
 utility department is working on a one water plan I believe is called, there's also a waste

00:43:13.020 --> 00:43:18.900
 water master plan being drafted as well, I think it's just initially started, and then

00:43:18.900 --> 00:43:22.660
 there's also the storm water master plan, so there's a lot of master plans being drafted

00:43:22.660 --> 00:43:28.700
 as part, again, what was called out in the Den 24 Conference of Plan.

00:43:28.700 --> 00:43:32.820
 And then I think the last one here, the last number nine, complete all remaining projects

00:43:32.820 --> 00:43:37.900
 associated with the 2012 and 2014 bond capital projects, something that they wanted me to

00:43:37.900 --> 00:43:42.620
 make sure that you all understood that they're working on that and they're actually doing

00:43:42.620 --> 00:43:50.660
 a lot of work to get those projects completed, so a lot of work being done as we speak in

00:43:50.660 --> 00:43:55.780
 terms of infrastructure and utilities.

00:43:55.780 --> 00:44:02.960
 So in conclusion, I apologize for running really fast here, but major accomplishments,

00:44:02.960 --> 00:44:09.700
 we looked at the Conference of Plan and we identified 23 key actions, about 9 percent

00:44:09.700 --> 00:44:14.820
 of what we have completed so far, and that's just under the first year, so hopefully as

00:44:14.820 --> 00:44:20.620
 the years progress, we'll continue to add more actions to that list.

00:44:20.620 --> 00:44:25.860
 Projects and programs, approximately 150 key actions, about 60 percent are currently being

00:44:25.860 --> 00:44:26.860
 worked on.

00:44:26.860 --> 00:44:33.300
 The remaining actions are either not started or either ongoing or need a little bit more

00:44:33.300 --> 00:44:40.760
 time to get going, either due to funding or staffing, but those are also being monitored

00:44:40.760 --> 00:44:46.580
 and hopefully we can share with you at our next update a little bit more on what's happening

00:44:46.580 --> 00:44:51.820
 with those actions that are not listed or was not listed in your backup.

00:44:51.820 --> 00:44:59.760
 Last bullet here, last segment is the city has started a program or has a software program

00:44:59.760 --> 00:45:07.960
 that monitors and allows the city departments to track where certain initiatives, key actions,

00:45:07.960 --> 00:45:15.540
 city actions as well, where they are in terms of their progress.

00:45:15.540 --> 00:45:20.620
 So Invisio is the software program that allows us to do that.

00:45:20.620 --> 00:45:28.100
 What's really neat about Invisio is that we can include a number of key actions or strategies

00:45:28.100 --> 00:45:35.220
 or initiatives from multiple plans and we're able to link them, so if there is an action

00:45:35.220 --> 00:45:42.820
 or a strategy that's similar, we can have one, an ability to just enter one entry and

00:45:42.820 --> 00:45:49.020
 that would then supplement or supply the answer to those strategies or in progress of those

00:45:49.020 --> 00:45:52.720
 strategies at one time rather than having to do them multiple times.

00:45:52.720 --> 00:46:00.040
 So I think when we come back next year, I know we will, we'll have Invisio up and running

00:46:00.040 --> 00:46:05.220
 and we'll share with you some of the data and the results that come out of that exercise.

00:46:05.220 --> 00:46:10.180
 It'll be a lot more easier way of presenting and understanding some of the key action because

00:46:10.180 --> 00:46:16.260
 now we can also look at other plans and identify how those are doing in relationship to the

00:46:16.260 --> 00:46:19.760
 key actions that are in our comprehensive plan.

00:46:19.760 --> 00:46:25.160
 So with that, that concludes my presentation and I'll be happy to answer any questions.

00:46:25.160 --> 00:46:30.540
 Thank you, Ron, Commissioner McDeid.

00:46:30.540 --> 00:46:31.540
 Thank you, Chair.

00:46:31.540 --> 00:46:35.700
 Ron, if you could go back to your first slide where you had the northeast, southeast and

00:46:35.700 --> 00:46:36.700
 the downtown.

00:46:36.700 --> 00:46:37.700
 Yes, sir.

00:46:37.700 --> 00:46:39.980
 I just have a quick question about the downtown area.

00:46:39.980 --> 00:46:44.580
 I know it's not, it hasn't started yet, but is there any way you could tell me like how

00:46:44.580 --> 00:46:49.620
 far that stretches on all four sides as far as street name-wise, you know?

00:46:49.620 --> 00:46:50.620
 For southeast?

00:46:50.620 --> 00:46:51.780
 No, no, for the downtown.

00:46:51.780 --> 00:46:52.780
 For downtown?

00:46:52.780 --> 00:46:53.780
 We don't, we don't know.

00:46:53.780 --> 00:46:55.780
 I think U.S. 380- That's to be determined.

00:46:55.780 --> 00:46:56.780
 Yeah, yeah.

00:46:56.780 --> 00:47:04.420
 I think if you're looking at the map, I think 380, U.S. University would be the most northern

00:47:04.420 --> 00:47:09.260
 one, but as far as the east, west and south, it's still not known.

00:47:09.260 --> 00:47:10.260
 Okay.

00:47:10.260 --> 00:47:11.260
 Yeah.

00:47:11.260 --> 00:47:13.580
 But I know 380 would probably be where we would cut it out there.

00:47:13.580 --> 00:47:14.580
 All right.

00:47:14.580 --> 00:47:18.300
 Well, and the reason why the boundaries are undetermined at this time, because we will

00:47:18.300 --> 00:47:23.760
 have extensive public engagement that will be involved in helping us identify what the

00:47:23.760 --> 00:47:25.300
 boundaries should be.

00:47:25.300 --> 00:47:29.820
 Obviously, we have the existing downtown master plan, but there may be some conversation about

00:47:29.820 --> 00:47:34.580
 whether or not that area needs to be grown, just like on southeast and on southeast with

00:47:34.580 --> 00:47:38.540
 all of our public engagement activities, we're really listening to the community to understand

00:47:38.540 --> 00:47:42.420
 with them as to what they consider the boundaries of Southeast Denton to be.

00:47:42.420 --> 00:47:46.260
 So it's really going to be public engagement driven to help us with that answer.

00:47:46.260 --> 00:47:47.260
 Okay.

00:47:47.260 --> 00:47:48.260
 That's the answer I was looking for.

00:47:48.260 --> 00:47:49.260
 Great.

00:47:49.260 --> 00:47:50.260
 Thank you.

00:47:50.260 --> 00:47:51.260
 All right.

00:47:51.260 --> 00:47:52.260
 Anybody else?

00:47:52.260 --> 00:47:53.260
 Commissioner Pruitt.

00:47:53.260 --> 00:47:54.260
 Thank you, Chair.

00:47:54.260 --> 00:47:55.260
 Hopefully two quick questions.

00:47:55.260 --> 00:48:04.020
 One, I heard you talk about the stormwater master plan, which is ongoing.

00:48:04.020 --> 00:48:13.540
 Are we investigating just having planning or development staff in those conversations

00:48:13.540 --> 00:48:25.540
 to see whether allowing stormwater management in pooled areas or certain mitigation fees

00:48:25.540 --> 00:48:33.660
 in lieu of things that are required would also aid our infill and redevelopment activities?

00:48:33.660 --> 00:48:38.380
 Is that something that's ongoing or is that something that might not start until after

00:48:38.380 --> 00:48:40.340
 the stormwater plan is complete?

00:48:40.340 --> 00:48:45.620
 I think every opportunity we can provide input, I think, would be -- I'm just reading the

00:48:45.620 --> 00:48:54.500
 notes here, states that engineering is currently managing the draft of the stormwater master

00:48:54.500 --> 00:48:55.500
 plan.

00:48:55.500 --> 00:48:57.220
 I can certainly follow up.

00:48:57.220 --> 00:49:02.140
 I know that with regards to the water and wastewater master plan, we have been involved

00:49:02.140 --> 00:49:07.540
 because actually part of their plan is to understand what the city's growth is and so

00:49:07.540 --> 00:49:08.780
 they can plan ahead.

00:49:08.780 --> 00:49:13.540
 I think similarly, the stormwater master plan should have something to that effect.

00:49:13.540 --> 00:49:18.500
 But specifically to your question, we have not had that discussion, but we certainly

00:49:18.500 --> 00:49:21.700
 can make that as part of the plan being drafted.

00:49:21.700 --> 00:49:29.140
 Yeah, it's more just a question if staff feels like looking into that, just because I know

00:49:29.140 --> 00:49:35.660
 sometimes that stormwater infrastructure can be nonlinear in cost as far as you get economies

00:49:35.660 --> 00:49:36.980
 of scale and that sort of thing.

00:49:36.980 --> 00:49:42.660
 If there's opportunities to take some steps forward and some other goals by looking at

00:49:42.660 --> 00:49:45.900
 that, that may be helpful.

00:49:45.900 --> 00:49:52.280
 Second question, and you're at the slide now, so thank you, Commissioner McDade, mud policy.

00:49:52.280 --> 00:49:58.160
 So I will admit I didn't actually go back and find the past mud policy that was passed,

00:49:58.160 --> 00:50:08.120
 but I know that we had a couple of confusing plat applications and conditional, reconditional

00:50:08.120 --> 00:50:14.900
 approvals that happened because there was uncertainty in street design standards and

00:50:14.900 --> 00:50:18.500
 county accepting and approving.

00:50:18.500 --> 00:50:27.860
 I guess my question is, did that final mud policy account for those confusions so that

00:50:27.860 --> 00:50:32.260
 we'll have fewer of them going forward, or is that something we still need to work through?

00:50:32.260 --> 00:50:37.460
 So the policy is that, it's just a policy, it's not a technical design manual.

00:50:37.460 --> 00:50:43.380
 But the policy does speak to, it encourages that development would occur in accordance

00:50:43.380 --> 00:50:46.020
 with the city's design specifications and standards.

00:50:46.020 --> 00:50:52.100
 So part of that conversation is whether or not the developments that are being done as

00:50:52.100 --> 00:50:55.780
 municipal utility districts will eventually want to annex into the city.

00:50:55.780 --> 00:50:59.980
 And if they are, then we're interested in understanding or providing some direction

00:50:59.980 --> 00:51:04.020
 in terms of, at least with the infrastructure that they're being built in accordance with

00:51:04.020 --> 00:51:05.340
 our city design requirements.

00:51:05.340 --> 00:51:11.120
 So that way we know what we're inheriting at such point in time when they, if they do

00:51:11.120 --> 00:51:13.260
 choose to move forward with annexation.

00:51:13.260 --> 00:51:19.320
 So it's really that policy encourages the developments to develop consistent with our

00:51:19.320 --> 00:51:22.980
 design requirements that we have in place.

00:51:22.980 --> 00:51:28.420
 And I was trying to think what else we included in there, but it really provides the framework

00:51:28.420 --> 00:51:29.740
 and in helping have the conversation.

00:51:29.740 --> 00:51:33.220
 I don't know if you recall when we, I might have given a presentation to the commission

00:51:33.220 --> 00:51:38.140
 probably last year when we were working on this and really the goal is eventually to

00:51:38.140 --> 00:51:42.140
 work with the mud developers and to enter into development agreements.

00:51:42.140 --> 00:51:48.320
 So it's very clear in terms of how the infrastructure is being designed and are they providing development

00:51:48.320 --> 00:51:51.540
 aspects that are more in alignment with some of our conference of plan goals and some of

00:51:51.540 --> 00:51:53.940
 our design goals.

00:51:53.940 --> 00:51:57.820
 We've been very fortunate with some of the conversations that we've had with the mud

00:51:57.820 --> 00:52:00.940
 developers that they're very open to that.

00:52:00.940 --> 00:52:07.340
 And in such that we're also having conversations regarding with utilities that are B that they're

00:52:07.340 --> 00:52:13.060
 having to construct, with those B utilities that the city is eventually inheriting.

00:52:13.060 --> 00:52:14.640
 And if so, what that might look like.

00:52:14.640 --> 00:52:20.580
 So it's really our goal is to help work with them and steer us to design requirements that

00:52:20.580 --> 00:52:25.180
 are, or are having them build infrastructure that is consistent with our design requirements.

00:52:25.180 --> 00:52:28.980
 Because at the end of the day, if we're ultimately going to be responsible for maintaining them,

00:52:28.980 --> 00:52:33.380
 especially if they choose to annex into the city, we want to know what we're receiving.

00:52:33.380 --> 00:52:37.660
 So did that answer your question, Mr. Prout?

00:52:37.660 --> 00:52:38.660
 Okay.

00:52:38.660 --> 00:52:39.660
 Okay.

00:52:39.660 --> 00:52:40.660
 Commissioner Cole.

00:52:40.660 --> 00:52:41.660
 Thank you, chair.

00:52:41.660 --> 00:52:45.620
 So you hear a lot of, is this voluntary or is there teeth in this enforcement for these

00:52:45.620 --> 00:52:46.620
 mud districts?

00:52:46.620 --> 00:52:55.140
 Um, could that, so, I mean- They, so, um, we, we encourage them to enter

00:52:55.140 --> 00:52:57.740
 into development agreement, but that doesn't necessarily mean they have to.

00:52:57.740 --> 00:52:58.740
 They have to.

00:52:58.740 --> 00:52:59.740
 So, right.

00:52:59.740 --> 00:53:00.740
 It's, it's a negotiation, right?

00:53:00.740 --> 00:53:02.320
 We kind of know what we're getting with these mud districts.

00:53:02.320 --> 00:53:08.100
 We're getting water wells, septic, propane, that's what we're getting.

00:53:08.100 --> 00:53:11.540
 And that's if, and you're right, they have the ability to be able to develop in that

00:53:11.540 --> 00:53:12.540
 nature.

00:53:12.540 --> 00:53:17.500
 Um, but we have been very fortunate with some of the mud developers, um, the Legends development

00:53:17.500 --> 00:53:21.980
 is a great example where they entered into development agreement with the city and committed

00:53:21.980 --> 00:53:25.300
 to building infrastructure in accordance with some of our design requirements.

00:53:25.300 --> 00:53:30.940
 So because they do have an interest in eventually having that neighborhood annex into the city.

00:53:30.940 --> 00:53:35.380
 So, um, we were able to work with them and put together a development agreement, um,

00:53:35.380 --> 00:53:38.820
 so that it outlines how their utilities will be provided.

00:53:38.820 --> 00:53:43.300
 Because in some cases, you know, they, they may be building their own package systems,

00:53:43.300 --> 00:53:48.940
 but ultimately they see the benefit of being a part of the city's waters, especially the

00:53:48.940 --> 00:53:54.220
 city's water system, because if their water source is otherwise groundwater or they're

00:53:54.220 --> 00:53:59.780
 drilling wells, then they're, they also recognize that longer term, that water source may not

00:53:59.780 --> 00:54:00.780
 be guaranteed.

00:54:00.780 --> 00:54:04.740
 So hence why they're interested in, in how they can set up their system to be able to

00:54:04.740 --> 00:54:06.260
 connect to the city's water system.

00:54:06.260 --> 00:54:11.700
 Okay. That's the, that's the key thing because these are all these mud districts are drilling

00:54:11.700 --> 00:54:12.700
 into the plexi.

00:54:12.700 --> 00:54:14.820
 That's where they're all getting their water.

00:54:14.820 --> 00:54:21.180
 I get my water from the plexi and all the well people that have been digging wells in

00:54:21.180 --> 00:54:28.060
 this county for 60 years, I'll tell you, I may see the plexi drop in my lifetime.

00:54:28.060 --> 00:54:29.980
 Never thought I would before.

00:54:29.980 --> 00:54:38.060
 So a transition from their well system to the city water is what you're saying.

00:54:38.060 --> 00:54:39.060
 Right.

00:54:39.060 --> 00:54:44.060
 So with these developments, we work with them to understand how they're designing their

00:54:44.060 --> 00:54:49.860
 utility system, because ultimately if their goal is to tie into our water system for a

00:54:49.860 --> 00:54:54.660
 much more reliable source of water being provided for them for the longer term, then we want

00:54:54.660 --> 00:54:56.300
 to be part of that conversation.

00:54:56.300 --> 00:55:01.500
 And so, so far we've, we've benefited from MED developers coming and meeting with us

00:55:01.500 --> 00:55:05.820
 and, and having those bigger picture conversations, right.

00:55:05.820 --> 00:55:09.060
 They're going to make investments in infrastructure anyway.

00:55:09.060 --> 00:55:14.540
 So what does that look like and is there an opportunity for, especially if they're wanting

00:55:14.540 --> 00:55:19.980
 to tie into the city system, how, how does that occur, right?

00:55:19.980 --> 00:55:24.340
 Putting a plan in place so we know how that occurs and then also so that their utility

00:55:24.340 --> 00:55:25.860
 system syncs up with ours.

00:55:25.860 --> 00:55:30.340
 So, but that, that, that will theoretically be on their dime, not ours.

00:55:30.340 --> 00:55:31.340
 Correct.

00:55:31.340 --> 00:55:32.340
 Right.

00:55:32.340 --> 00:55:33.340
 I mean, presumably, yes.

00:55:33.340 --> 00:55:37.300
 So it is, you know, they're having to make infrastructure investments, right?

00:55:37.300 --> 00:55:42.140
 So it's, it's part of that conversation is, is how do we leverage that infrastructure

00:55:42.140 --> 00:55:43.540
 investment that they're making?

00:55:43.540 --> 00:55:48.380
 So and, and it's just, you know, and then it goes from there.

00:55:48.380 --> 00:55:49.380
 Thank you.

00:55:49.380 --> 00:55:54.300
 Anybody else, Ron, thank you for putting all this together.

00:55:54.300 --> 00:55:55.300
 It's a lot of information.

00:55:55.300 --> 00:55:56.300
 Thank you.

00:55:56.300 --> 00:56:00.380
 It is a great presentation and I'm glad this is being done annually.

00:56:00.380 --> 00:56:01.380
 I think it's super important.

00:56:01.380 --> 00:56:02.380
 Yeah.

00:56:02.380 --> 00:56:05.120
 I think that's something that we established, you know, when we updated the conference plans

00:56:05.120 --> 00:56:08.220
 that we come back to the planning zoning commission as the sounding board.

00:56:08.220 --> 00:56:13.540
 So there's something that, you know, you guys see or want more information on, we certainly

00:56:13.540 --> 00:56:14.540
 can bring it forward.

00:56:14.540 --> 00:56:15.540
 Excellent.

00:56:15.540 --> 00:56:16.540
 Thank you so much.

00:56:16.540 --> 00:56:17.540
 If I can add to that, sure.

00:56:17.540 --> 00:56:18.540
 I'll add so.

00:56:18.540 --> 00:56:19.540
 If it's quickly because it's 626.

00:56:19.540 --> 00:56:20.540
 Absolutely.

00:56:20.540 --> 00:56:24.580
 So I know there's food waiting for us also and Ron touched on this in his presentation,

00:56:24.580 --> 00:56:28.580
 but once we get all of this uploaded into the Invisio software, then you can, you can

00:56:28.580 --> 00:56:30.020
 check this at any time, right?

00:56:30.020 --> 00:56:34.220
 You don't have to wait for annual updates from us and, and yes, kudos to Ron.

00:56:34.220 --> 00:56:37.660
 He did a tremendous job on pulling all this information together.

00:56:37.660 --> 00:56:41.220
 Working with the other departments, we thank them also because we know it, it took some

00:56:41.220 --> 00:56:44.200
 time for them to be able to provide us all this information.

00:56:44.200 --> 00:56:46.180
 So he's done a fabulous job on this.

00:56:46.180 --> 00:56:47.780
 I absolutely agree.

00:56:47.780 --> 00:56:48.780
 Thank you.

00:56:48.780 --> 00:56:49.780
 Thank you very much.

00:56:49.780 --> 00:56:55.540
 With that, I'll adjourn our work session at 627 and we will reconvene as soon as we can

00:56:55.540 --> 00:56:58.780
 get to city hall and open the public meeting.

00:56:58.780 --> 00:57:05.660
 Good evening and welcome to the city of Denton's planning and zoning commission meeting for

00:57:05.660 --> 00:57:09.220
 Wednesday, June 14th, 2023.

00:57:09.220 --> 00:57:13.000
 With a quorum present, I will call us to order at 650 PM.

00:57:13.000 --> 00:57:14.180
 Thank you for your patience.

00:57:14.180 --> 00:57:17.580
 Sorry, we are delayed in getting our meeting started.

00:57:17.580 --> 00:57:24.140
 First item on our agenda is the pledge to the U.S. and Texas Flags.

00:57:24.140 --> 00:57:30.180
 I pledge allegiance to the flag of the United States of America and to the republic for

00:57:30.180 --> 00:57:38.300
 which it stands, one nation, under God, indivisible, with liberty and justice for all.

00:57:38.300 --> 00:57:48.540
 Under the Texas flag, I pledge allegiance to the Texas one state, under God, one and indivisible.

00:57:48.540 --> 00:57:49.540
 Thank you.

00:57:49.540 --> 00:57:54.940
 And before we get started with our agenda, I just wanted to let everyone who's here and

00:57:54.940 --> 00:58:03.140
 also watching that our two public hearing items for this evening, 5A and 5B, are both

00:58:03.140 --> 00:58:09.140
 being postponed, so we will not be taking action on those items this evening.

00:58:09.140 --> 00:58:15.260
 And with that, our first item we are taking action on is 2A, approval of our May 24th

00:58:15.260 --> 00:58:16.900
 planning and zoning minutes.

00:58:16.900 --> 00:58:17.900
 Commissioner Smith.

00:58:17.900 --> 00:58:19.260
 Make a motion to approve.

00:58:19.260 --> 00:58:20.260
 Commissioner Villarreal.

00:58:20.260 --> 00:58:21.260
 Second.

00:58:21.260 --> 00:58:23.100
 We've got a first and a second for approval.

00:58:23.100 --> 00:58:26.340
 Any discussion?

00:58:26.340 --> 00:58:34.220
 Let's vote on the board, please.

00:58:34.220 --> 00:58:36.100
 That motion carries 7-0.

00:58:36.100 --> 00:58:39.740
 That will move us to our consent agenda for this evening.

00:58:39.740 --> 00:58:40.860
 Commissioner Villarreal.

00:58:40.860 --> 00:58:42.900
 I move approval.

00:58:42.900 --> 00:58:43.900
 Commissioner Anderson.

00:58:43.900 --> 00:58:44.900
 Second.

00:58:44.900 --> 00:58:48.100
 We've got a first and a second for approval of the consent agenda.

00:58:48.100 --> 00:58:49.100
 Any discussion?

00:58:49.100 --> 00:58:57.380
 Okay, let's vote on the board, please.

00:58:57.380 --> 00:58:59.060
 That motion carries 7-0.

00:58:59.060 --> 00:59:05.460
 That will take us to items for individual consideration for ASPP 230014.

00:59:05.460 --> 00:59:08.660
 I'll invite Sean Jacobson up for presentation.

00:59:08.660 --> 00:59:09.660
 Hi, Sean.

00:59:09.660 --> 00:59:19.460
 Members of the commission, let's pull up presentation here.

00:59:19.460 --> 00:59:21.460
 Okay.

00:59:21.460 --> 00:59:25.220
 There we go.

00:59:25.220 --> 00:59:26.220
 All right.

00:59:26.220 --> 00:59:31.500
 This is a proposed preliminary plat for the Mayhill addition.

00:59:31.500 --> 00:59:37.100
 This is an approximately 32-acre site off Mayhill Road, north of the intersection of

00:59:37.100 --> 00:59:39.620
 Mayhill and Quail Creek.

00:59:39.620 --> 00:59:43.300
 Currently, staff is recommending denial of this plat because it does not meet the approval

00:59:43.300 --> 00:59:44.300
 criteria.

00:59:44.300 --> 00:59:50.100
 However, staff has no objection to the request of 30-day extension to June 28, 2023, and

00:59:50.100 --> 00:59:53.540
 I'm happy to answer any questions about this plat.

00:59:53.540 --> 00:59:54.540
 Thank you, Sean.

00:59:54.540 --> 00:59:55.540
 Any questions?

00:59:55.540 --> 00:59:57.620
 I don't see any.

00:59:57.620 --> 00:59:58.620
 Thank you so much.

00:59:58.620 --> 00:59:59.620
 Commissioner Villarreal.

00:59:59.620 --> 01:00:04.980
 I move approval of the extension request to a date certain of June 28, 2023.

01:00:04.980 --> 01:00:05.980
 Commissioner Cole.

01:00:05.980 --> 01:00:06.980
 Second.

01:00:06.980 --> 01:00:13.820
 We have a second for approval of the extension request to June 28, 2023.

01:00:13.820 --> 01:00:22.180
 Seeing no discussion, let's vote on the board please.

01:00:22.180 --> 01:00:28.500
 The motion carries 7-0, moving us to 4-B, PP 230012.

01:00:28.500 --> 01:00:33.540
 Sean has remained at the podium for a presentation here.

01:00:33.540 --> 01:00:34.540
 Thank you, Chair.

01:00:34.540 --> 01:00:40.340
 I'm Sean Jacobson, here to present a proposed preliminary plat for the Sage Creek Town Homes

01:00:40.340 --> 01:00:42.180
 edition.

01:00:42.180 --> 01:00:49.180
 This is off Lattimore and Audre, approximately 23-acre site, and again, this plat has not

01:00:49.180 --> 01:00:53.900
 yet met our criteria for approval, so staff is recommending denial, but has no objection

01:00:53.900 --> 01:00:57.580
 to the request of 30-day extension to June 28.

01:00:57.580 --> 01:00:58.580
 Happy to answer any questions.

01:00:58.580 --> 01:00:59.580
 Thank you, Sean.

01:00:59.580 --> 01:01:06.820
 I do not see any questions, thank you.

01:01:06.820 --> 01:01:09.340
 Chair can entertain a discussion or a motion.

01:01:09.340 --> 01:01:10.340
 Commissioner Smith.

01:01:10.340 --> 01:01:14.260
 Make a motion to approve the extension of date certain to June 28, 2023.

01:01:14.260 --> 01:01:15.260
 Commissioner Cole.

01:01:15.260 --> 01:01:16.260
 Second.

01:01:16.260 --> 01:01:19.620
 We've got a first and a second for approval of the extension request to a date certain

01:01:19.620 --> 01:01:23.780
 of June 28, 2023.

01:01:23.780 --> 01:01:27.740
 Seeing no discussion, let's vote on the board please.

01:01:27.740 --> 01:01:32.940
 Motion carries 7-0.

01:01:32.940 --> 01:01:36.900
 That will take us to 4C, PP230013.

01:01:36.900 --> 01:01:40.740
 Julie Wyatt is here to present that item.

01:01:40.740 --> 01:01:44.660
 Good evening, Julie Wyatt, principal planner.

01:01:44.660 --> 01:01:49.460
 This is a preliminary plat for a single family residential subdivision located in the east

01:01:49.460 --> 01:01:52.260
 part of town, south of McKinney.

01:01:52.260 --> 01:01:56.940
 They do have a few items that they need to correct in order to meet the criteria for

01:01:56.940 --> 01:01:57.940
 approval.

01:01:57.940 --> 01:02:03.860
 So while staff is recommending denial of the request, we have no objection to the requested

01:02:03.860 --> 01:02:08.580
 30-day extension and I'll be happy to answer any questions.

01:02:08.580 --> 01:02:09.580
 Thanks, Julie.

01:02:09.580 --> 01:02:11.660
 I do not see any questions for you.

01:02:11.660 --> 01:02:12.660
 Thank you.

01:02:12.660 --> 01:02:15.660
 Commissioner Villarreal.

01:02:15.660 --> 01:02:20.380
 I move approval of the extension request to a date certain of June 28, 2023.

01:02:20.380 --> 01:02:21.380
 Commissioner Cole.

01:02:21.380 --> 01:02:22.380
 Second.

01:02:22.380 --> 01:02:25.300
 Got a first and a second for approval of the extension request to a date certain of June

01:02:25.300 --> 01:02:27.740
 28, 2023.

01:02:27.740 --> 01:02:37.400
 Seeing no speakers, let's vote on the board please.

01:02:37.400 --> 01:02:39.060
 That motion carries 7-0.

01:02:39.060 --> 01:02:43.980
 That will take us to 4D, PE230003.

01:02:43.980 --> 01:02:44.980
 Angie is here for that item.

01:02:44.980 --> 01:02:48.220
 Good evening, Chair and members of the commission.

01:02:48.220 --> 01:02:49.700
 Angie Megler, senior planner.

01:02:49.700 --> 01:02:59.460
 Just a moment here.

01:02:59.460 --> 01:03:04.060
 This is PE230003.

01:03:04.060 --> 01:03:06.980
 It's a plat extension request for Habitat Village.

01:03:06.980 --> 01:03:08.260
 Just a little bit of background on this.

01:03:08.260 --> 01:03:11.620
 This is a plan development for Habitat for Humanity.

01:03:11.620 --> 01:03:13.900
 It is called Habitat Village.

01:03:13.900 --> 01:03:20.020
 The original preliminary plat was approved back in July of 2021 per our DDC.

01:03:20.020 --> 01:03:27.220
 Plats do expire after two years if part or all of the final plat is not filed by that

01:03:27.220 --> 01:03:28.420
 time.

01:03:28.420 --> 01:03:33.300
 This plat is set to expire in July of 2023, so the applicant did submit a plat extension

01:03:33.300 --> 01:03:34.300
 request.

01:03:34.300 --> 01:03:36.180
 We do have some criteria for approval.

01:03:36.180 --> 01:03:41.900
 The applicant did submit this request prior to the expiration of the preliminary plat.

01:03:41.900 --> 01:03:46.780
 Plans for the requested extension or for the delay in the final plat were included in the

01:03:46.780 --> 01:03:47.780
 applicant's narrative.

01:03:47.780 --> 01:03:51.940
 However, they have been making progress towards the civil engineering plans for phase one,

01:03:51.940 --> 01:03:54.620
 which consists of approximately 16 residential lots.

01:03:54.620 --> 01:03:59.100
 It is anticipated that the civil engineering plans are approved within the next month or

01:03:59.100 --> 01:04:04.620
 so and following that would be the final plat for phase one of the development.

01:04:04.620 --> 01:04:10.620
 In order to avoid possible lapse of the approval of that original preliminary plat, they are

01:04:10.620 --> 01:04:15.980
 seeking an extension, which the Commission has the authority to grant for up to one year.

01:04:15.980 --> 01:04:19.140
 With that, I'm happy to answer any questions you may have.

01:04:19.140 --> 01:04:20.140
 Thank you, Angie.

01:04:20.140 --> 01:04:23.980
 Any questions for Angie?

01:04:23.980 --> 01:04:26.180
 Thank you very much.

01:04:26.180 --> 01:04:27.180
 Commissioner Smith.

01:04:27.180 --> 01:04:29.380
 Make a motion to approve.

01:04:29.380 --> 01:04:30.380
 Commissioner Cole.

01:04:30.380 --> 01:04:31.380
 Second.

01:04:31.380 --> 01:04:32.380
 Okay.

01:04:32.380 --> 01:04:36.220
 We've got a first and a second for approval of this plat extension.

01:04:36.220 --> 01:04:37.220
 Any discussion?

01:04:37.220 --> 01:04:38.220
 Okay.

01:04:38.220 --> 01:04:48.580
 Seeing none, let's vote on the board, please.

01:04:48.580 --> 01:04:51.380
 That motion carries 7-0.

01:04:51.380 --> 01:04:57.380
 As I mentioned at the start of our meeting, our public hearing item 5ADCA230001 is being

01:04:57.380 --> 01:04:59.300
 postponed and will be re-noticed.

01:04:59.300 --> 01:05:07.820
 We will not be taking action on that item today, and 5BZ220022 as well will be re-noticed

01:05:07.820 --> 01:05:08.820
 on a future date.

01:05:08.820 --> 01:05:11.540
 We will not be taking action on that item this evening.

01:05:11.540 --> 01:05:21.180
 So that will move us to our planning and zoning matrix, and I will let Tina have the floor.

01:05:21.180 --> 01:05:23.340
 Thank you, Chair Ellis.

01:05:23.340 --> 01:05:25.220
 Looks like I have the longer report this evening.

01:05:25.220 --> 01:05:30.860
 No, actually, just real quick, a few items, projects you're aware of that we're working

01:05:30.860 --> 01:05:31.860
 on.

01:05:31.860 --> 01:05:36.880
 So the downtown area plan project, as Ron mentioned earlier this evening in his presentation,

01:05:36.880 --> 01:05:42.580
 we do have the contract slated to go to council at the end of this month on June 27th.

01:05:42.580 --> 01:05:47.060
 And so once we get that contract approved by city council, then we will take the next

01:05:47.060 --> 01:05:51.980
 steps and start working with our consultant to our kickoff meeting and roll out into some

01:05:51.980 --> 01:05:55.620
 extensive public engagement with that particular project.

01:05:55.620 --> 01:05:59.500
 Southeast Denton, recent activities related to that project, or we've added a few more

01:05:59.500 --> 01:06:04.380
 members to the steering committee, and so council took action at their previous meeting

01:06:04.380 --> 01:06:06.180
 as it relates to that.

01:06:06.180 --> 01:06:12.140
 We do have another round of listening sessions that we are hosting next week on June 21st

01:06:12.140 --> 01:06:18.580
 from 6 to 8, as well as June 22nd from 6 to 8 p.m. at the Martin Luther King Junior Recreation

01:06:18.580 --> 01:06:19.900
 Center here in Denton.

01:06:19.900 --> 01:06:24.340
 And so with folks missed out on getting to meet with our consultant team back in April,

01:06:24.340 --> 01:06:27.300
 then they have another opportunity to meet with them next week.

01:06:27.300 --> 01:06:34.020
 And so we've done some additional extensive public engagement and outreach to obtain that

01:06:34.020 --> 01:06:36.540
 event, we'll have folks come and participate.

01:06:36.540 --> 01:06:41.260
 We also have, with the Juneteenth festivities that are happening this weekend, so we're

01:06:41.260 --> 01:06:42.540
 going to have a presence.

01:06:42.540 --> 01:06:46.980
 Our team will, I know Julie and Mia have been working hard preparing for this event, along

01:06:46.980 --> 01:06:50.940
 with our consultant team, we will have a booth there at the Juneteenth event.

01:06:50.940 --> 01:06:56.080
 So we'll have staff present on Friday evening and on Saturday.

01:06:56.080 --> 01:07:00.460
 If folks have questions, want to talk with us so we can promote the project and hopefully

01:07:00.460 --> 01:07:03.660
 gain some additional feedback from the community that way.

01:07:03.660 --> 01:07:09.940
 I know the team is also meeting with representatives from LULAC on Saturday as well, because they

01:07:09.940 --> 01:07:12.540
 obviously have an interest within the project area.

01:07:12.540 --> 01:07:18.220
 The team will also be doing some intercept surveys next week, being out in the community

01:07:18.220 --> 01:07:22.300
 as well, again, trying to receive feedback from folks as it relates to the future of

01:07:22.300 --> 01:07:24.060
 Southeast Denton.

01:07:24.060 --> 01:07:29.700
 And then we will have our first steering committee meeting also next Friday, and I know the team's

01:07:29.700 --> 01:07:35.860
 going to be at the Sedna meeting on June 26th, so again, really pushing that public engagement,

01:07:35.860 --> 01:07:39.900
 really trying to have folks come and talk with us, learn more about the project, and

01:07:39.900 --> 01:07:45.060
 truly be involved in this plan that we're working on, because it is truly a community-driven

01:07:45.060 --> 01:07:47.400
 plan from that perspective.

01:07:47.400 --> 01:07:50.140
 Northeast, really no updates as it relates to that.

01:07:50.140 --> 01:07:54.340
 We're working on more of the analysis, starting to develop strategies.

01:07:54.340 --> 01:07:58.700
 The steering committee did meet here recently, and my apologies, I forgot to write the date

01:07:58.700 --> 01:08:03.120
 down, but we have been working with them in that regard.

01:08:03.120 --> 01:08:07.700
 And then lastly, I know the DCRC, some of you serve on the DCRC, and then the rest of

01:08:07.700 --> 01:08:10.740
 you are interested in what they're working on in their calendar.

01:08:10.740 --> 01:08:14.660
 They're actually going to take a short hiatus this summer, a couple of reasons why.

01:08:14.660 --> 01:08:20.620
 One allows folks to be able to take vacations and get trips planned, or be able to address

01:08:20.620 --> 01:08:22.860
 their trips that they may have planned.

01:08:22.860 --> 01:08:26.740
 Also gives us a little more time to be able to prepare some materials as we bring back,

01:08:26.740 --> 01:08:30.340
 as parking is going to be one of those items that we hit the ground running with.

01:08:30.340 --> 01:08:36.980
 And then also, we have, hopefully we'll get an additional council appointee to the committee

01:08:36.980 --> 01:08:40.420
 as well, that ideally will happen this summer.

01:08:40.420 --> 01:08:44.580
 So want to be able to start with a full slate, if at all possible.

01:08:44.580 --> 01:08:47.060
 We look to resume on August 14th.

01:08:47.060 --> 01:08:50.580
 So for those of you that are on that committee, I know there was some discussion about possibly

01:08:50.580 --> 01:08:57.320
 getting together in late July, but our topic that we were anticipating, they have a conflict

01:08:57.320 --> 01:08:58.320
 with DME.

01:08:58.320 --> 01:09:01.100
 And so we'll just start again in mid-August on that.

01:09:01.100 --> 01:09:08.500
 So but nonetheless, so they remain busy, and I should mention we did provide an update

01:09:08.500 --> 01:09:12.900
 on our public engagement plan as it relates to short-term rentals.

01:09:12.900 --> 01:09:18.180
 And so we'll be working on that because the DCRC wanted to make sure that we get out into

01:09:18.180 --> 01:09:22.740
 the community, receive feedback from the community, because they wanted to get that feedback first

01:09:22.740 --> 01:09:26.540
 before being able to make any additional decisions as it relates on code amendments.

01:09:26.540 --> 01:09:29.180
 So we have that going on as well.

01:09:29.180 --> 01:09:31.540
 So that concludes my report.

01:09:31.540 --> 01:09:38.140
 Other than we will note the comprehensive plan annual update item as, or having that

01:09:38.140 --> 01:09:42.060
 noted that we provided an update this evening for the commission's benefit.

01:09:42.060 --> 01:09:46.540
 And also, we are going to provide similar information to city council so that they're

01:09:46.540 --> 01:09:50.500
 aware of all the work that has been accomplished by the city organization as a whole as it

01:09:50.500 --> 01:09:52.960
 relates to our comprehensive plan implementation.

01:09:52.960 --> 01:09:53.980
 That concludes my report.

01:09:53.980 --> 01:09:54.980
 Thank you.

01:09:54.980 --> 01:09:55.980
 Thank you, Tina.

01:09:55.980 --> 01:09:57.380
 Anything for the matrix?

01:09:57.380 --> 01:09:58.380
 Commissioner Villarreal.

01:09:58.380 --> 01:10:02.460
 Just a quick question in regards to the Southeast Denton area plan preparation.

01:10:02.460 --> 01:10:07.020
 I understand that attendance may have been lower than expected.

01:10:07.020 --> 01:10:11.180
 Was that staff's expectations in terms of the amount of folks that ended up coming out

01:10:11.180 --> 01:10:12.980
 to the listening sessions?

01:10:12.980 --> 01:10:14.100
 Yes.

01:10:14.100 --> 01:10:18.400
 So it does not surprise us that our numbers were lower compared to, I know it gets compared

01:10:18.400 --> 01:10:22.140
 a lot with the Northeast Denton plan because of the numbers that we've had at the, some

01:10:22.140 --> 01:10:23.860
 of the public engagement.

01:10:23.860 --> 01:10:29.100
 But when we're working with a community that has experienced past harm by an organization

01:10:29.100 --> 01:10:35.260
 who feels that they're not heard from the city as an organization, then it does not

01:10:35.260 --> 01:10:37.980
 surprise me that folks are not wanting to be engaged.

01:10:37.980 --> 01:10:44.680
 And so hence why I can't tell you how much my team has really been trying to work on

01:10:44.680 --> 01:10:49.060
 maximizing relationships and, you know, they talk to one individual, you know, do you know

01:10:49.060 --> 01:10:52.940
 of anybody else that would be interested in this project and they reach out to them and

01:10:52.940 --> 01:10:55.220
 do you know anybody else that'll be reached out in this project.

01:10:55.220 --> 01:11:00.220
 So hence why they've been working really hard and really having a presence and getting information

01:11:00.220 --> 01:11:03.180
 out especially this next round of listening sessions.

01:11:03.180 --> 01:11:07.900
 We had our invitations translated into Spanish because we know that we have residents that

01:11:07.900 --> 01:11:11.060
 are Spanish speaking that are in this area of the community.

01:11:11.060 --> 01:11:18.100
 And so we were concerned that maybe that's why that particular demographic did not participate

01:11:18.100 --> 01:11:19.980
 in our listening sessions previously.

01:11:19.980 --> 01:11:23.940
 We intend to have a translator on site as well to be able to help so that hopefully

01:11:23.940 --> 01:11:27.860
 language is not a barrier of communication as it relates to this project.

01:11:27.860 --> 01:11:32.940
 But it doesn't surprise me that we've had low numbers on these kind of projects.

01:11:32.940 --> 01:11:34.700
 It's kind of hit or miss.

01:11:34.700 --> 01:11:37.780
 Mostly northeast, very engaged community, right.

01:11:37.780 --> 01:11:45.580
 And so they've got a strong network that they utilize in being able to communicate to folks

01:11:45.580 --> 01:11:47.660
 that have an interest in that project area.

01:11:47.660 --> 01:11:53.780
 So it's I would say don't compare the two areas and hold one against the other because

01:11:53.780 --> 01:11:56.620
 they're completely different situations that we're dealing with.

01:11:56.620 --> 01:11:57.620
 Right.

01:11:57.620 --> 01:12:02.580
 And my next question and your part probably answered it fully was did we change anything

01:12:02.580 --> 01:12:06.900
 between the first round of listening sessions in terms of reaching out to the community

01:12:06.900 --> 01:12:08.420
 to the summer listening sessions.

01:12:08.420 --> 01:12:12.700
 It sounds like we are doing a better job of reaching out to the Hispanic community in

01:12:12.700 --> 01:12:16.940
 southeastern which it's about half the population there.

01:12:16.940 --> 01:12:17.940
 Absolutely.

01:12:17.940 --> 01:12:25.700
 So we're trying to leverage all forms of communication that we can to get folks to participate.

01:12:25.700 --> 01:12:32.380
 Also trying to get a certain age of demographic as well as it relates to that project.

01:12:32.380 --> 01:12:37.380
 And so yes, we we've been working with our consultant to see what could we do to retool

01:12:37.380 --> 01:12:39.900
 as it relates to those public engagement sessions.

01:12:39.900 --> 01:12:40.900
 Fantastic.

01:12:40.900 --> 01:12:41.900
 Thank you.

01:12:41.900 --> 01:12:42.900
 You're welcome.

01:12:42.900 --> 01:12:43.900
 Commissioner Cole.

01:12:43.900 --> 01:12:44.900
 Yeah.

01:12:44.900 --> 01:12:53.060
 On the same frequency are the two smaller plans the same size as committee as far as people

01:12:53.060 --> 01:12:55.580
 or.

01:12:55.580 --> 01:12:56.580
 Right now?

01:12:56.580 --> 01:12:57.580
 No.

01:12:57.580 --> 01:13:04.780
 And so the again we just Julie how many total are we up to for southeast on the steering

01:13:04.780 --> 01:13:05.780
 committee.

01:13:05.780 --> 01:13:09.620
 Are we at eight now.

01:13:09.620 --> 01:13:12.300
 We have nine on the steering committee.

01:13:12.300 --> 01:13:14.300
 We could go up to a maximum of 15.

01:13:14.300 --> 01:13:18.100
 So we wanted to keep it around the 10 to 15.

01:13:18.100 --> 01:13:20.340
 We think that's probably the best.

01:13:20.340 --> 01:13:25.460
 Seems the lower end probably would be more beneficial to get a quorum you know if you're

01:13:25.460 --> 01:13:27.780
 if you're comparing right.

01:13:27.780 --> 01:13:35.540
 So it's we again trying to maximize those relationships we just received additional

01:13:35.540 --> 01:13:40.500
 names that we got added to the steering committee here at the last council meeting.

01:13:40.500 --> 01:13:45.100
 And so as as we continue to work on these projects if more people get interested there

01:13:45.100 --> 01:13:47.420
 may be some that will be willing to serve.

01:13:47.420 --> 01:13:51.900
 I think there's a misnomer out there that we're meeting every single week or that they

01:13:51.900 --> 01:13:55.700
 would have to meet every single week and that and that's not the case.

01:13:55.700 --> 01:14:00.780
 I know that comment was made by an individual and so we want to try to make sure that that

01:14:00.780 --> 01:14:05.020
 message was out there is that you're only meeting four times as it relates to the project.

01:14:05.020 --> 01:14:09.580
 You know it could be that that number expands but really we've got a schedule put in place

01:14:09.580 --> 01:14:16.260
 where they would meet potentially four times and we do a really good job of trying to use

01:14:16.260 --> 01:14:20.580
 their time wisely and obtain their feedback when we need it on the project.

01:14:20.580 --> 01:14:22.940
 So even with both groups right.

01:14:22.940 --> 01:14:27.060
 So the Northeast Denton plan obviously it's a little bit larger steering committee.

01:14:27.060 --> 01:14:32.060
 We just had many more people that are willing and interested in participating and you know

01:14:32.060 --> 01:14:34.940
 met several of the categories that we were interested in having feedback on.

01:14:34.940 --> 01:14:39.620
 So hopefully we'll have hopefully have a similar challenge with downtown where we have more

01:14:39.620 --> 01:14:43.700
 people wanting to serve on the steering committee than then ideally we have positions for that.

01:14:43.700 --> 01:14:44.700
 So Commissioner McDade.

01:14:44.700 --> 01:14:45.700
 Thank you.

01:14:45.700 --> 01:14:52.620
 Tina I am I need you to go back you said the steering the South East End steering committee

01:14:52.620 --> 01:15:00.340
 was going to go into me when we have them scheduled for next Friday June 23rd.

01:15:00.340 --> 01:15:08.340
 What time one thirty one thirty is when they're meeting at the Martin Luther King Center or

01:15:08.340 --> 01:15:15.020
 where I have a question is that is that going to be like a closed session or technically

01:15:15.020 --> 01:15:16.940
 it is an open meeting.

01:15:16.940 --> 01:15:21.180
 All of the conversations and discussion would be limited to the steering committee.

01:15:21.180 --> 01:15:25.780
 If we had time remaining then there could be an opportunity to receive any comments

01:15:25.780 --> 01:15:26.780
 at that time.

01:15:26.780 --> 01:15:30.780
 I know we had that happen with the Northeast steering committee here recently.

01:15:30.780 --> 01:15:34.960
 So in their case we use the full allotted time and then some.

01:15:34.960 --> 01:15:36.900
 So but it is an open meeting.

01:15:36.900 --> 01:15:40.100
 People are welcome to attend but the discussion will be limited to the steering committee

01:15:40.100 --> 01:15:41.400
 and where is the meeting.

01:15:41.400 --> 01:15:45.200
 It will be at the Development Services Center at 401 North Elm.

01:15:45.200 --> 01:15:46.200
 Okay.

01:15:46.200 --> 01:15:47.200
 All right.

01:15:47.200 --> 01:15:48.200
 Thank you.

01:15:48.200 --> 01:15:49.200
 You bet.

01:15:49.200 --> 01:15:50.200
 Okay.

01:15:50.200 --> 01:15:51.200
 Great.

01:15:51.200 --> 01:15:52.200
 Other things for the matrix.

01:15:52.200 --> 01:15:53.200
 Yeah.

01:15:53.200 --> 01:15:56.460
 And thank you to staff for I mean working so hard on both these area plans and it definitely

01:15:56.460 --> 01:16:00.220
 shouldn't be compared and attended and none of that should be compared.

01:16:00.220 --> 01:16:02.460
 That's just because they happen to be running at the same time.

01:16:02.460 --> 01:16:06.900
 They're two vastly different areas with vastly different problems.

01:16:06.900 --> 01:16:14.260
 So the issue is it's so great that we have both of these in place and momentum will get

01:16:14.260 --> 01:16:20.300
 going and as you all stay on it and people will get involved and we'll have positive

01:16:20.300 --> 01:16:24.100
 things come out of both of them I am certain.

01:16:24.100 --> 01:16:28.860
 Tina one thing to add to the matrix if you could and you know this is just coming out

01:16:28.860 --> 01:16:33.700
 of the work session discussion today but could we get some kind somebody here from Rhodes

01:16:33.700 --> 01:16:36.940
 to talk about our text dot Rhodes.

01:16:36.940 --> 01:16:37.940
 What is happening.

01:16:37.940 --> 01:16:45.020
 You said a few words today that you know were interesting about maybe take back or what.

01:16:45.020 --> 01:16:50.500
 I mean I would love a synopsis in a work session report by someone I think that would do all

01:16:50.500 --> 01:16:55.460
 of us good to to yeah to get a yes.

01:16:55.460 --> 01:16:56.460
 Absolutely.

01:16:56.460 --> 01:17:00.960
 So just what's happening just so a discussion regarding all of our text out roadways or

01:17:00.960 --> 01:17:04.900
 just particularly Almond Locus.

01:17:04.900 --> 01:17:12.860
 Well I suppose Almond Locus would probably be a great discussion wouldn't it.

01:17:12.860 --> 01:17:14.100
 I guess let's start there.

01:17:14.100 --> 01:17:15.780
 Why don't we do that.

01:17:15.780 --> 01:17:22.020
 That way we can get a lot of information and make it not be quite so broad.

01:17:22.020 --> 01:17:27.980
 So we get some specific questions answered that commissioners brought up and I know that

01:17:27.980 --> 01:17:32.020
 all of us are getting questions on from citizens.

01:17:32.020 --> 01:17:33.020
 OK.

01:17:33.020 --> 01:17:34.020
 Yes.

01:17:34.020 --> 01:17:35.020
 We can add that.

01:17:35.020 --> 01:17:39.180
 And to that point I mean if you are interested in other text out roadways that we have here

01:17:39.180 --> 01:17:45.700
 in the city the mobility committee receives I believe it's a monthly report or quarterly

01:17:45.700 --> 01:17:53.180
 report but if you go to like city of Denton public meetings it takes you to our public

01:17:53.180 --> 01:17:57.580
 meeting page that has all of the various boards of commissions and committees that meet click

01:17:57.580 --> 01:18:01.100
 on mobility committee and then you can look at their meeting dates.

01:18:01.100 --> 01:18:04.820
 One of the things like I said they get a it's either a monthly or quarterly report from

01:18:04.820 --> 01:18:10.340
 a consultant that we work with I.T.S. they provide a report as it relates to all of the

01:18:10.340 --> 01:18:17.540
 text our roadways projects that are happening within our city and it includes timelines

01:18:17.540 --> 01:18:21.220
 associated with the project the latest status as it relates to that and if members serves

01:18:21.220 --> 01:18:25.060
 me correctly they even highlight in yellow what's changed since the previous meeting

01:18:25.060 --> 01:18:30.740
 but it's a great summary it's a tool that I have a tendency to utilize to see where

01:18:30.740 --> 01:18:35.860
 we are on on certain projects but just given our sheer number of text out roadways that

01:18:35.860 --> 01:18:37.340
 we have within our community.

01:18:37.340 --> 01:18:41.020
 But but as it relates to that matrix request we can definitely get a presentation regarding

01:18:41.020 --> 01:18:45.660
 element locus appreciate it Commissioner Pruitt yeah I just wanted to second the request from

01:18:45.660 --> 01:18:48.420
 chair Ellis I think that'll be very helpful.

01:18:48.420 --> 01:18:53.540
 What I would like to hear is specifically element locusts with take back concerning

01:18:53.540 --> 01:18:57.540
 how that integrates with the downtown plan as well.

01:18:57.540 --> 01:19:02.460
 And then maybe just a brief update of how the scheduling is looking for the remaining

01:19:02.460 --> 01:19:07.720
 phases of Bonnie Brae versus the thirty five why project there's just a lot of stuff going

01:19:07.720 --> 01:19:13.780
 on over there there's a lot of things breaking ground for industrial stuff west of their

01:19:13.780 --> 01:19:18.420
 just kind of how how that mess is going to play out over the next five years would be

01:19:18.420 --> 01:19:19.420
 helpful.

01:19:19.420 --> 01:19:25.380
 Okay so I heard Bonnie Brae project and I'm sorry what in relationship to thirty five.

01:19:25.380 --> 01:19:32.020
 So the messaging I've heard from staff before was that one of the main goals with the Bonnie

01:19:32.020 --> 01:19:37.220
 Brae project and getting it funded earlier with the twenty nineteen bond and previously

01:19:37.220 --> 01:19:43.100
 was to get that project completed before text comes through and rips up thirty five with

01:19:43.100 --> 01:19:49.920
 the interchange between E and W to be able to handle some of the overflow traffic.

01:19:49.920 --> 01:19:54.780
 So just it doesn't have to be a long update I would say let's focus on on element locusts

01:19:54.780 --> 01:20:02.140
 but if there's information that would be pertinent to our you know decisions in that area with

01:20:02.140 --> 01:20:07.060
 what's happening there it may help answer some questions on the front end if that makes

01:20:07.060 --> 01:20:08.060
 sense.

01:20:08.060 --> 01:20:19.900
 Okay thank you okay any concluding items okay well with that I wish everybody a happy flag

01:20:19.900 --> 01:20:24.940
 day enjoy the rest of your evening and I will adjourn us at seven thirteen p.m. Thank you.