1 00:00:00,000 --> 00:00:06,780 Good afternoon and welcome to the City of Denton's Planning and Zoning Commission meeting 2 00:00:06,780 --> 00:00:10,520 for Wednesday, June 14th, 2023. 3 00:00:10,520 --> 00:00:15,760 This is our work session and with the quorum present, I will call us to order at 530 p.m. 4 00:00:15,760 --> 00:00:20,800 First item on our work session is citizen comment on consent agenda. 5 00:00:20,800 --> 00:00:27,680 I do not see anyone here for that, so we will move to clarification on tonight's agenda 6 00:00:27,680 --> 00:00:30,400 for our public meeting. 7 00:00:30,400 --> 00:00:36,440 So Commission, any questions on the minutes for the 24th of May? 8 00:00:36,440 --> 00:00:43,120 How about on the consent agenda? 9 00:00:43,120 --> 00:00:44,120 Commissioner McDade? 10 00:00:44,120 --> 00:00:48,120 Yes, I just, what number is that? 11 00:00:48,120 --> 00:00:49,120 B. 12 00:00:49,120 --> 00:00:50,120 3B? 13 00:00:50,120 --> 00:00:52,880 Yeah, I just wanted to ask Julie. 14 00:00:52,880 --> 00:00:56,160 We'll get Julie up here and she can take your question. 15 00:00:56,160 --> 00:00:57,160 Hi, Julie. 16 00:00:57,160 --> 00:01:05,500 Let me pull up the plat so we can take a look at it. 17 00:01:05,500 --> 00:01:06,500 All right. 18 00:01:06,500 --> 00:01:07,500 How can I help you? 19 00:01:07,500 --> 00:01:15,120 Well, okay, now, some of the residents who live in that area, they were unsure about 20 00:01:15,120 --> 00:01:16,760 what was being built on that property. 21 00:01:16,760 --> 00:01:21,200 I know it pretty much happened during the pandemic, so they didn't get a lot of the 22 00:01:21,200 --> 00:01:24,680 information and I think this is the one they brought to me. 23 00:01:24,680 --> 00:01:28,080 They weren't sure, but then when I saw the mill in Johnson, I'm thinking this is the 24 00:01:28,080 --> 00:01:31,960 one they were asking about and I told them I'd try to get all the information I could. 25 00:01:31,960 --> 00:01:32,960 Absolutely. 26 00:01:32,960 --> 00:01:37,520 So this is a property that has a single family dwelling on it. 27 00:01:37,520 --> 00:01:41,480 It's actually two lots that they're just replatting into one lot. 28 00:01:41,480 --> 00:01:44,840 The single family home that is on the property will remain. 29 00:01:44,840 --> 00:01:53,280 They did build an accessory structure on that second lot, and so this replat will just put 30 00:01:53,280 --> 00:01:58,240 it all into one lot so that that building that was recently constructed will just be 31 00:01:58,240 --> 00:02:00,720 an accessory structure to that single family home. 32 00:02:00,720 --> 00:02:01,720 Okay. 33 00:02:01,720 --> 00:02:03,040 Use isn't changing on the property. 34 00:02:03,040 --> 00:02:04,040 All righty. 35 00:02:04,040 --> 00:02:05,040 Thank you. 36 00:02:05,040 --> 00:02:06,040 You bet. 37 00:02:06,040 --> 00:02:07,040 Thanks, Julie. 38 00:02:07,040 --> 00:02:09,840 Any other questions on consent? 39 00:02:09,840 --> 00:02:12,040 Okay. 40 00:02:12,040 --> 00:02:14,920 Let's move to items for individual consideration. 41 00:02:14,920 --> 00:02:20,160 We've got 4A, PP230014, which belongs to Sean. 42 00:02:20,160 --> 00:02:22,240 How are you, Sean? 43 00:02:22,240 --> 00:02:23,400 I'm doing well. 44 00:02:23,400 --> 00:02:26,640 Good evening, Chair and members of the Commission. 45 00:02:26,640 --> 00:02:38,880 This is a proposed preliminary plat for the Mayhill addition, which is off Mayhill. 46 00:02:38,880 --> 00:02:45,440 They do not currently meet our standards for approval, and so therefore we are recommending 47 00:02:45,440 --> 00:02:51,400 denial, but I have no objection to the request of 30-day extension to June 28th. 48 00:02:51,400 --> 00:02:54,480 Questions for Sean on this one? 49 00:02:54,480 --> 00:02:55,480 Thank you very much. 50 00:02:55,480 --> 00:02:56,480 Mm-hmm. 51 00:02:56,480 --> 00:02:57,480 You staying up here for 4B? 52 00:02:57,480 --> 00:02:58,480 Yes, ma'am. 53 00:02:58,480 --> 00:02:59,480 Okay. 54 00:02:59,480 --> 00:03:00,480 You got it. 55 00:03:00,480 --> 00:03:01,480 PP230012. 56 00:03:01,480 --> 00:03:02,480 Yes. 57 00:03:02,480 --> 00:03:09,280 So this is a proposed preliminary plat for the Sage Creek townhomes that is near Latimore. 58 00:03:09,280 --> 00:03:16,080 They are also not yet meeting our criteria, recommending denial, but perfectly happy with 59 00:03:16,080 --> 00:03:21,480 the 30-day extension. 60 00:03:21,480 --> 00:03:22,480 Thank you, Sean. 61 00:03:22,480 --> 00:03:23,480 Appreciate it, Chair. 62 00:03:23,480 --> 00:03:31,720 That'll move us to 4C, PP230013, and that is Julie's item. 63 00:03:31,720 --> 00:03:34,240 Good evening, Julie Wyatt. 64 00:03:34,240 --> 00:03:37,960 This is a preliminary plat for a single-family residential neighborhood. 65 00:03:37,960 --> 00:03:43,660 It's a second phase of a residential development that you may remember from a few years ago. 66 00:03:43,660 --> 00:03:46,100 It is on the south side of McKinney. 67 00:03:46,100 --> 00:03:48,200 As I mentioned, this is just phase two of it. 68 00:03:48,200 --> 00:03:53,500 It had a preliminary plat that was approved in, I believe, 2019. 69 00:03:53,500 --> 00:03:59,880 It has since expired, so they're just coming back with a new preliminary plat. 70 00:03:59,880 --> 00:04:05,080 Oh, we are recommending denial, sorry. 71 00:04:05,080 --> 00:04:06,080 We are recommending denial. 72 00:04:06,080 --> 00:04:09,660 They still have a few more things that they need to correct. 73 00:04:09,660 --> 00:04:14,040 We have no objection to their requested extension to June 28th. 74 00:04:14,040 --> 00:04:15,040 Okay. 75 00:04:15,040 --> 00:04:16,800 Any questions for Julie? 76 00:04:16,800 --> 00:04:17,800 Okay. 77 00:04:17,800 --> 00:04:18,800 Thank you. 78 00:04:18,800 --> 00:04:19,800 Thank you. 79 00:04:19,800 --> 00:04:23,000 That'll move us to 4D. 80 00:04:23,000 --> 00:04:27,320 It's PE230003, Angie. 81 00:04:27,320 --> 00:04:28,320 Hi. 82 00:04:28,320 --> 00:04:29,320 Good evening. 83 00:04:29,320 --> 00:04:31,280 Angie Mangler, Senior Planner. 84 00:04:31,280 --> 00:04:38,480 Just a second, I'm going to switch over. 85 00:04:38,480 --> 00:04:45,580 This is a plat extension request for a preliminary plat for Habitat Village. 86 00:04:45,580 --> 00:04:52,460 This preliminary plat was originally approved for this project in July of 2021 per the DDC. 87 00:04:52,460 --> 00:04:55,680 Our preliminary plots are valid for two years. 88 00:04:55,680 --> 00:05:01,560 They are working towards platting or the civil engineering plans for phase one of their development, 89 00:05:01,560 --> 00:05:06,840 which includes about 18 lots of the 35 total that were proposed as part of this plan development. 90 00:05:06,840 --> 00:05:11,440 However, they're not quite there yet in advance of the preliminary plat expiring. 91 00:05:11,440 --> 00:05:16,080 They are requesting their plat extension, which the DDC allows the Planning and Zoning 92 00:05:16,080 --> 00:05:19,220 Commission to extend for up to a year. 93 00:05:19,220 --> 00:05:24,400 So staff has no objections to the requested plat extension as the applicant's been making 94 00:05:24,400 --> 00:05:28,320 progress forward on this and anticipates having the final plat submitted in the next couple 95 00:05:28,320 --> 00:05:34,400 months following the approval of the CEPs. 96 00:05:34,400 --> 00:05:37,360 Thank you, Angie. 97 00:05:37,360 --> 00:05:38,360 Thank you so much. 98 00:05:38,360 --> 00:05:39,360 Thank you. 99 00:05:39,360 --> 00:05:40,360 All right. 100 00:05:40,360 --> 00:05:44,040 Both of our public hearings tonight have been postponed, and I was informed we're taking 101 00:05:44,040 --> 00:05:47,080 no action on either one, so we won't have to open either hearing. 102 00:05:47,080 --> 00:05:50,160 They'll be re-noticed when they come back to us. 103 00:05:50,160 --> 00:05:51,160 Okay. 104 00:05:51,160 --> 00:05:56,560 So then that will take us to our work session report, which will be receive a report, hold 105 00:05:56,560 --> 00:06:01,480 a discussion regarding the implementation of the Denton 2040 Comp Plan. 106 00:06:01,480 --> 00:06:02,480 Hi, Ron. 107 00:06:02,480 --> 00:06:03,480 Good afternoon. 108 00:06:03,480 --> 00:06:04,480 Good afternoon. 109 00:06:04,480 --> 00:06:05,480 Evening. 110 00:06:05,480 --> 00:06:06,480 Chair, members of the Commission. 111 00:06:06,480 --> 00:06:13,240 I'll pull up the presentation real quick. 112 00:06:13,240 --> 00:06:21,200 All right, Ron Megiddo, Principal Planner with Development Services, excited to be here 113 00:06:21,200 --> 00:06:27,720 to share with you some of the activities and results that we have been working on towards 114 00:06:27,720 --> 00:06:33,160 the implementation of the Denton 2040 Comprehensive Plan. 115 00:06:33,160 --> 00:06:40,640 So as you all know, about a year ago, roughly March of 2022, the city updated their Comprehensive 116 00:06:40,640 --> 00:06:45,500 Plan, and it's the Denton 2040 Comprehensive Plan, and as part of that Comprehensive Plan, 117 00:06:45,500 --> 00:06:47,860 there are a number of action items. 118 00:06:47,860 --> 00:06:55,680 Those action items are compiled and put together under the action plan, which is in the back 119 00:06:55,680 --> 00:06:57,120 of the Comprehensive Plan. 120 00:06:57,120 --> 00:07:01,960 So for those that are familiar with the Comprehensive Plan, it's in the back, and it has all of 121 00:07:01,960 --> 00:07:07,840 the actions that we will be discussing or part of what we will be discussing this evening. 122 00:07:07,840 --> 00:07:14,760 So in the body of the Comprehensive Plan, there are 548 actions. 123 00:07:14,760 --> 00:07:21,200 Those 548 actions are then further synthesized and included in the action plan, which is 124 00:07:21,200 --> 00:07:26,400 now less to 253 key actions. 125 00:07:26,400 --> 00:07:32,920 So if you can imagine, basically, if there are multiple actions that have very similar 126 00:07:32,920 --> 00:07:40,480 goals, they're put into smaller action groupings, and that, again, that is the 253 key actions 127 00:07:40,480 --> 00:07:41,480 that we have. 128 00:07:41,480 --> 00:07:48,380 Now, those 253 actions are further categorized under the elements that we have in the Comprehensive 129 00:07:48,380 --> 00:07:58,400 Plan, that is the land use, the parks, mobility, infrastructure, community, and economic as 130 00:07:58,400 --> 00:07:59,400 well. 131 00:07:59,400 --> 00:08:05,920 So those are elements, and so, again, they're further categorized under those elements. 132 00:08:05,920 --> 00:08:11,340 Those key actions are given a timeframe for when they are to be implemented. 133 00:08:11,340 --> 00:08:18,000 So we try to identify which key actions should occur during the short term, which is between 134 00:08:18,000 --> 00:08:23,640 now and three years, midterm, which is three to five years, and then long term beyond five 135 00:08:23,640 --> 00:08:24,640 years. 136 00:08:24,640 --> 00:08:28,080 But we also identify that there are some key actions that are just ongoing. 137 00:08:28,080 --> 00:08:32,960 So they don't have set timeframes, but we know that they're going to be ongoing throughout 138 00:08:32,960 --> 00:08:36,160 the implementation of the Comprehensive Plan. 139 00:08:36,160 --> 00:08:42,140 So the action plan or the Comprehensive Plan as a whole is our framework in which the decision 140 00:08:42,140 --> 00:08:47,720 making body, you guys, as an example, will use the Comprehensive Plan as the basis for 141 00:08:47,720 --> 00:08:56,160 making your decisions with regards to applications, either through development, but also budgetary 142 00:08:56,160 --> 00:08:57,440 ones as well for city council. 143 00:08:57,440 --> 00:09:03,560 So again, the framework in which the bodies of the city use for decision making. 144 00:09:03,560 --> 00:09:09,960 It also provides a task list for the departments and other entities, public entities as well, 145 00:09:09,960 --> 00:09:16,140 where they use the Comprehensive Plan to use to identify what tasks are needed to be accomplished. 146 00:09:16,140 --> 00:09:22,360 And so the Comprehensive Plan is a very important document, which the community uses, again, 147 00:09:22,360 --> 00:09:28,220 for a lot of what we're looking to do to implement for the future of DEN. 148 00:09:28,220 --> 00:09:32,400 So I use that as a background to kind of give you an idea of what we are going to be going 149 00:09:32,400 --> 00:09:33,400 over. 150 00:09:33,400 --> 00:09:38,320 Again, the 253 key actions is what we have. 151 00:09:38,320 --> 00:09:43,520 Those 253 actions, as I listed earlier or named earlier, these are the elements. 152 00:09:43,520 --> 00:09:50,360 And this table here illustrates how many key actions are included by the element. 153 00:09:50,360 --> 00:09:54,520 I just wanted to point out, I'm not going to go through all of this, but just community 154 00:09:54,520 --> 00:09:58,400 character has 45 key actions. 155 00:09:58,400 --> 00:10:02,200 It's the highest one, and it has a lot of them under that element. 156 00:10:02,200 --> 00:10:06,760 The second to that is parks, conservation, and environment. 157 00:10:06,760 --> 00:10:10,760 And then following that is infrastructure and utilities, which is down here. 158 00:10:10,760 --> 00:10:15,120 So I'm not to say that the other ones don't have important ones, but I just want to point 159 00:10:15,120 --> 00:10:21,400 out that those are the three elements that have the most key actions in them or under 160 00:10:21,400 --> 00:10:24,480 that category. 161 00:10:24,480 --> 00:10:27,040 So we're going to start with land use. 162 00:10:27,040 --> 00:10:36,400 And before we get to land use, in your backup, we provided to you two groupings or two lists. 163 00:10:36,400 --> 00:10:42,880 The first list is the major accomplishments that the city has done since the adoption 164 00:10:42,880 --> 00:10:46,760 of the update, which is, again, March of 2022. 165 00:10:46,760 --> 00:10:51,040 That list is provided, I believe, as exhibit two. 166 00:10:51,040 --> 00:10:57,240 And then the other list is our ongoing projects and programs that the city is working on. 167 00:10:57,240 --> 00:11:02,800 And when I say city, I mean the entire city, city departments, from planning to police 168 00:11:02,800 --> 00:11:06,880 to community services, everyone involved in the implementation. 169 00:11:06,880 --> 00:11:08,160 And again, that's exhibit three. 170 00:11:08,160 --> 00:11:12,760 So I won't go through all of them because there's a lot of those actions. 171 00:11:12,760 --> 00:11:18,240 I wanted to, at this presentation, just highlight some of the major accomplishments, also some 172 00:11:18,240 --> 00:11:23,000 of the ongoing projects and programs that, again, the city is working on. 173 00:11:23,000 --> 00:11:28,480 So in this presentation, we will cover the major accomplishments and the ongoing programs 174 00:11:28,480 --> 00:11:30,480 and projects by elements. 175 00:11:30,480 --> 00:11:33,560 So the first element is land use. 176 00:11:33,560 --> 00:11:38,860 So starting off with land use, this slide here illustrates the two major accomplishments 177 00:11:38,860 --> 00:11:41,880 that the city accomplished since the adoption. 178 00:11:41,880 --> 00:11:43,400 I'll start with the first one. 179 00:11:43,400 --> 00:11:49,760 And the first one is the MUDs, which is this exhibit here that I am sure you all are familiar 180 00:11:49,760 --> 00:11:50,760 with. 181 00:11:50,760 --> 00:11:55,760 The city adopted a policy in which we are going to review MUDs. 182 00:11:55,760 --> 00:12:00,480 So that was one of the key actions that is listed in the comprehensive plan. 183 00:12:00,480 --> 00:12:05,800 And we accomplished that in October, I believe, of 2022. 184 00:12:05,800 --> 00:12:12,280 In addition to the MUD policy, we also started the implementation or the creation of the 185 00:12:12,280 --> 00:12:15,480 area plans that, again, was in our comprehensive plan. 186 00:12:15,480 --> 00:12:22,960 One of the major implementation strategies that we identified early in the update. 187 00:12:22,960 --> 00:12:29,880 So you see that we have three that we are looking at in the city council on April, I 188 00:12:29,880 --> 00:12:36,800 believe, of 2022, prioritized the three that you see up here, and those are the northeast, 189 00:12:36,800 --> 00:12:40,840 the southeast, and the downtown plan update. 190 00:12:40,840 --> 00:12:48,720 In regards to where they are currently, that is, the northeast is probably halfway through 191 00:12:48,720 --> 00:12:49,720 the process. 192 00:12:49,720 --> 00:12:54,120 We are in phase three of the process of creating the area plan. 193 00:12:54,120 --> 00:12:55,360 Southeast just got started. 194 00:12:55,360 --> 00:12:59,560 So they are in the initial stage of public engagement and public input. 195 00:12:59,560 --> 00:13:01,840 For downtown, we have not yet started that. 196 00:13:01,840 --> 00:13:03,080 That is coming up. 197 00:13:03,080 --> 00:13:09,440 In fact, the contract for that consultant to help with the downtown is set later this 198 00:13:09,440 --> 00:13:10,440 month. 199 00:13:10,440 --> 00:13:15,400 So hopefully when that occurs, we will then start the update of the downtown, which will 200 00:13:15,400 --> 00:13:21,640 go through the year up to, I believe, May is when we are looking at the actual completion 201 00:13:21,640 --> 00:13:22,640 of that. 202 00:13:22,640 --> 00:13:27,800 So there is a lot of work associated with that, as well as the others. 203 00:13:27,800 --> 00:13:34,360 You can see that the implementation of the comprehensive plan involves the creation of 204 00:13:34,360 --> 00:13:38,540 these area plans and others. 205 00:13:38,540 --> 00:13:40,920 This list here, I won't go through all of them. 206 00:13:40,920 --> 00:13:46,440 I already kind of mentioned the major accomplishments with regards to number two and three under 207 00:13:46,440 --> 00:13:48,060 major accomplishments. 208 00:13:48,060 --> 00:13:56,560 We also did a code amendment as well earlier of the previous year in which we amended the 209 00:13:56,560 --> 00:13:59,760 public own and manage drills section of the code. 210 00:13:59,760 --> 00:14:01,980 Again, that is a major accomplishment. 211 00:14:01,980 --> 00:14:06,480 The list below that are the projects and programs that we are currently working on. 212 00:14:06,480 --> 00:14:10,300 And again, I won't go through all of them, but again, we have highlighted some already 213 00:14:10,300 --> 00:14:13,620 with the update to the downtown master plan. 214 00:14:13,620 --> 00:14:18,380 The creation of the northeast and southeast area plans. 215 00:14:18,380 --> 00:14:23,640 We continue to work and coordinate with other departments in relationship to the development 216 00:14:23,640 --> 00:14:29,820 of the city in terms of land use applications and so forth. 217 00:14:29,820 --> 00:14:38,440 So there is a lot going on with the implementation in relationship to the land use element. 218 00:14:38,440 --> 00:14:42,540 The next element is the fiscal and economic vitality. 219 00:14:42,540 --> 00:14:48,500 I highlighted here the economic development strategic plan which is what our economic development 220 00:14:48,500 --> 00:14:55,300 department is using in terms of implementing certain programs and projects. 221 00:14:55,300 --> 00:15:02,320 The logos that you see to the right are our partners in this effort with the economic 222 00:15:02,320 --> 00:15:07,220 development partnership, the den chamber of commerce as well as discovered den all play 223 00:15:07,220 --> 00:15:14,480 an integral part in implementing the actions that are within the den 2040 comprehensive 224 00:15:14,480 --> 00:15:15,480 plan. 225 00:15:15,480 --> 00:15:21,060 And again, a lot of the information or key actions that are listed relate back to these 226 00:15:21,060 --> 00:15:26,660 individual groups, but also as it relates to the implementation or the work that is 227 00:15:26,660 --> 00:15:32,940 being done under the economic development strategic plan. 228 00:15:32,940 --> 00:15:38,460 All of the accomplishments I wanted to highlight is the first is the establishment of the physical 229 00:15:38,460 --> 00:15:39,740 impact analysis tool. 230 00:15:39,740 --> 00:15:45,060 I think this is something that the city wanted to have and I know that some of you may have 231 00:15:45,060 --> 00:15:47,300 already seen some of them. 232 00:15:47,300 --> 00:15:53,020 This tool was just created and we're using it as a way of providing additional information 233 00:15:53,020 --> 00:15:57,260 and data as you guys look over certain applications. 234 00:15:57,260 --> 00:16:05,900 SUP zoning cases, PDs, you'll see that there is an exhibit that provides the physical impact 235 00:16:05,900 --> 00:16:13,400 analysis results and that is again something that we implemented in 2022. 236 00:16:13,400 --> 00:16:19,260 Also completion of roadway funding strategy between the capital improvements, sorry capital 237 00:16:19,260 --> 00:16:26,060 projects and our finance department, they've developed the funding strategy in which they 238 00:16:26,060 --> 00:16:31,460 are looking at how to fund a lot of the work that is being done for the next 40 years, 239 00:16:31,460 --> 00:16:39,100 so that has been done and that is being applied in all the work that's being done under public 240 00:16:39,100 --> 00:16:41,980 works and capital projects. 241 00:16:41,980 --> 00:16:46,260 So in terms of the other projects and programs that the city is working on, again I won't 242 00:16:46,260 --> 00:16:50,540 go through all of them, but I just wanted to list those that are listed here that provide 243 00:16:50,540 --> 00:16:56,900 a little bit more detail, I think I would probably want to focus on the promotion of 244 00:16:56,900 --> 00:17:02,340 historic preservation, I think we always think of historic preservation as obviously preserving 245 00:17:02,340 --> 00:17:06,940 our historical resources, but it's also a form of economic development. 246 00:17:06,940 --> 00:17:15,100 So with Cameron's help in working with economic development, there's a lot of activities related 247 00:17:15,100 --> 00:17:20,700 to some of the key actions that are in the comprehensive plan that they're working towards 248 00:17:20,700 --> 00:17:21,780 implementing. 249 00:17:21,780 --> 00:17:28,260 I know that Cameron's work includes a couple of things and I think we'll highlight it in 250 00:17:28,260 --> 00:17:35,720 the next chapter or element, but I know that working with the downtown and the preservation 251 00:17:35,720 --> 00:17:42,220 of those buildings as well as the historic districts, all of which help in our efforts 252 00:17:42,220 --> 00:17:46,360 to strengthen the city's economy. 253 00:17:46,360 --> 00:17:55,180 Some of the other things I'd like to focus on as well is the utilization of catalyst 254 00:17:55,180 --> 00:18:01,860 fund for those that are not familiar, our director Wayne Emerson is working on this 255 00:18:01,860 --> 00:18:08,700 catalyst fund, it's a way of having funds available for promotion but also ways of incentivizing 256 00:18:08,700 --> 00:18:13,100 some of the strategies that they're using again under the strategic plan that they have, 257 00:18:13,100 --> 00:18:18,780 so that's something that's just started, so again, work being done again ultimately to 258 00:18:18,780 --> 00:18:22,940 help implement the key actions that are in our comprehensive plan. 259 00:18:22,940 --> 00:18:27,900 Community capture, so this is where I- Ron, hang on just a second please. 260 00:18:27,900 --> 00:18:28,900 Sure. 261 00:18:28,900 --> 00:18:29,900 Commissioner Anderson. 262 00:18:29,900 --> 00:18:31,380 I have a quick question, thank you Chair. 263 00:18:31,380 --> 00:18:35,980 About the roads, you said that there's money been set aside for certain roads, is that 264 00:18:35,980 --> 00:18:36,980 right? 265 00:18:36,980 --> 00:18:42,540 The roadway funding strategy, you said they've allocated funds or something like that? 266 00:18:42,540 --> 00:18:53,420 Oh yes, so all of the fundings that our capital projects has, they have funding through bond 267 00:18:53,420 --> 00:19:01,020 packages and those sorts, there's a strategy in which how they are allocated and funded. 268 00:19:01,020 --> 00:19:05,020 Can you tell me when they're going to fix South Locust and South town? 269 00:19:05,020 --> 00:19:08,180 You're talking about bringing businesses- I drive there every day. 270 00:19:08,180 --> 00:19:09,180 And economic development. 271 00:19:09,180 --> 00:19:10,180 It's horrible. 272 00:19:10,180 --> 00:19:11,180 It is horrible. 273 00:19:11,180 --> 00:19:12,180 And Eagle, let's add Eagle to that. 274 00:19:12,180 --> 00:19:15,660 I have friends in Lantana, I have friends in South Denton, they won't come into Denton 275 00:19:15,660 --> 00:19:17,220 because the streets are horrible. 276 00:19:17,220 --> 00:19:19,340 Well, we're probably getting off topic here. 277 00:19:19,340 --> 00:19:23,260 No, no, I just didn't know if that's part of the strategic funding. 278 00:19:23,260 --> 00:19:25,420 That's actually an easier question. 279 00:19:25,420 --> 00:19:29,540 It's a great question, those are text out roadways and we do have a plan in place and 280 00:19:29,540 --> 00:19:33,140 working with them to eventually have those turned over to the city, but we're working 281 00:19:33,140 --> 00:19:39,180 with text out on that, but this is, this complete roadway funding strategy was, if members source 282 00:19:39,180 --> 00:19:43,620 were correctly, as Ron pointed, related to all the available sources of funding that 283 00:19:43,620 --> 00:19:48,700 the city may have as it relates to roadway improvements and in text out may have been 284 00:19:48,700 --> 00:19:52,220 part of that conversation because we do have a fair amount of text out roadways within 285 00:19:52,220 --> 00:19:58,220 our community, but that also was to really to receive direction from council on the various 286 00:19:58,220 --> 00:20:03,900 funding sources that we could apply towards roadway construction. 287 00:20:03,900 --> 00:20:04,900 Great question. 288 00:20:04,900 --> 00:20:05,900 Great question. 289 00:20:05,900 --> 00:20:10,900 I wish I had an answer for you. 290 00:20:10,900 --> 00:20:11,900 Okay. 291 00:20:11,900 --> 00:20:18,380 So next element is community character and part of that community character is, again, 292 00:20:18,380 --> 00:20:24,340 our historic resources and the slide here that I provided, just going to highlight some 293 00:20:24,340 --> 00:20:30,700 of the things that the city's working towards, I know that again, Cameron is helping with 294 00:20:30,700 --> 00:20:35,140 a lot of the historic preservation actions. 295 00:20:35,140 --> 00:20:41,340 She's actually created an Instagram webpage. 296 00:20:41,340 --> 00:20:47,380 There's the Den Historic Preservation Plan that we're working on as well. 297 00:20:47,380 --> 00:20:53,080 Street sign toppers was a major accomplishment this past year. 298 00:20:53,080 --> 00:20:57,780 So that's in place and so we're actually working on that. 299 00:20:57,780 --> 00:21:06,540 And then overall, just the city in downtown in general, ensuring that we have the music 300 00:21:06,540 --> 00:21:13,540 and arts events continue and we hope that we can promote more and that we can, again, 301 00:21:13,540 --> 00:21:16,820 bring more folks to downtown, hopefully they can get here. 302 00:21:16,820 --> 00:21:22,180 But that's something that we have a lot towards and again, community character is one of those 303 00:21:22,180 --> 00:21:29,060 elements that has a lot of key actions and that reflects on what you see here. 304 00:21:29,060 --> 00:21:33,060 You see a lot of programs and projects that are being worked on. 305 00:21:33,060 --> 00:21:37,860 Not a whole lot of major accomplishments to date, but I'm sure that in the next coming 306 00:21:37,860 --> 00:21:43,180 years we'll see more and more of those key actions implemented or accomplished. 307 00:21:43,180 --> 00:21:45,180 But again, we have a lot going on. 308 00:21:45,180 --> 00:21:50,300 The Parks Department has a lot going on in terms of community character, of course. 309 00:21:50,300 --> 00:21:56,660 They're the individuals that are working on a lot of the public amenities or infrastructure 310 00:21:56,660 --> 00:21:57,660 that we have. 311 00:21:57,660 --> 00:22:02,900 So you see they're listed here a number of times. 312 00:22:02,900 --> 00:22:09,500 And I think if I were to highlight some of the major, you know, progress programs that 313 00:22:09,500 --> 00:22:14,300 are in progress that is, is basically what the parks is doing. 314 00:22:14,300 --> 00:22:20,020 I attended a parks board meeting not too long ago and they shared with the board some of 315 00:22:20,020 --> 00:22:23,380 the projects that they're working on and some of the programs they're working on. 316 00:22:23,380 --> 00:22:25,780 And it was a 60 slide presentation. 317 00:22:25,780 --> 00:22:33,780 So they have a lot going on between park master planning, between installing public art, that's 318 00:22:33,780 --> 00:22:42,900 under the Parks Department, acquiring additional park land, preserving, you know, natural areas, 319 00:22:42,900 --> 00:22:50,460 working with the CIP individuals to make sure that, you know, their trails and park system 320 00:22:50,460 --> 00:22:54,780 is in line with some of the developments that's going on but also with the city projects. 321 00:22:54,780 --> 00:22:59,820 So the Parks Department is very busy and have a lot to do with community character. 322 00:22:59,820 --> 00:23:02,980 So again, the list is long. 323 00:23:02,980 --> 00:23:07,980 The further detailed information is in the backup to all of these different categories 324 00:23:07,980 --> 00:23:09,540 or these different key actions. 325 00:23:09,540 --> 00:23:14,180 So hopefully you have an opportunity to read that because it goes a little bit more into 326 00:23:14,180 --> 00:23:21,100 detail as to what they're doing in their efforts to implement those key actions. 327 00:23:21,100 --> 00:23:28,180 All right, I talked about parks and conservation, obviously they're part of the community character 328 00:23:28,180 --> 00:23:38,380 but they also provide parks conservation and environment as well, efforts in that key actions. 329 00:23:38,380 --> 00:23:44,260 So the ones that I showed here, just to highlight some of the actions that they're working on, 330 00:23:44,260 --> 00:23:51,980 obviously the continuing preservation of key areas, either be it's natural heritage or 331 00:23:51,980 --> 00:24:00,540 natural resources or wildlife or other, you know, landscaping preservation as well. 332 00:24:00,540 --> 00:24:04,760 But we also have existing parks that they also have to maintain. 333 00:24:04,760 --> 00:24:11,900 So I showed a picture of Quaker Town and the Flash Park here which they also actually maintain. 334 00:24:11,900 --> 00:24:17,500 So a lot of the acquiring of new parks but also maintaining of existing parks as well 335 00:24:17,500 --> 00:24:23,980 is part of their day-to-day and ultimately part of this comprehensive plan. 336 00:24:23,980 --> 00:24:28,100 The map to the right just illustrates where those city parks are located throughout the 337 00:24:28,100 --> 00:24:32,580 city of Denton. 338 00:24:32,580 --> 00:24:37,580 So one of the major accomplishments is the update to the Parks Recreation and Trail System 339 00:24:37,580 --> 00:24:43,140 Master Plan that was done in early March of 2022. 340 00:24:43,140 --> 00:24:47,940 And then the list that you see here provide all the different actions or summary of those 341 00:24:47,940 --> 00:24:49,740 actions that they're working on. 342 00:24:49,740 --> 00:24:54,600 And one of the things that I want to highlight is the protection of agriculture land and 343 00:24:54,600 --> 00:24:59,260 heritage ranch lands as well as any natural features. 344 00:24:59,260 --> 00:25:03,340 I know that the Parks Department when I was at the Parks Board talked about acquiring 345 00:25:03,340 --> 00:25:09,220 property throughout the city, not just one area and preserving that for future use for 346 00:25:09,220 --> 00:25:10,380 recreation. 347 00:25:10,380 --> 00:25:13,300 So they have funds in which to do that. 348 00:25:13,300 --> 00:25:17,060 Not a lot but enough to be able to acquire some land. 349 00:25:17,060 --> 00:25:20,180 I know that they recently purchased some land to the north of the city. 350 00:25:20,180 --> 00:25:28,140 So as part of their ultimate effort in creating a regional park system in which we have multiple 351 00:25:28,140 --> 00:25:32,220 parks that are connected by natural trails. 352 00:25:32,220 --> 00:25:36,140 Yeah, parks are doing a lot of stuff. 353 00:25:36,140 --> 00:25:42,340 So again, the list that you have in the backup has again a little bit more detail into what 354 00:25:42,340 --> 00:25:43,860 they're working on. 355 00:25:43,860 --> 00:25:49,020 But if you have any questions, please let me know and I'll certainly try to answer those 356 00:25:49,020 --> 00:25:50,020 questions. 357 00:25:50,020 --> 00:25:51,020 Mobility. 358 00:25:51,020 --> 00:25:57,220 So this is a really important one I think to me after land use mobility is probably one 359 00:25:57,220 --> 00:26:01,700 of the biggest element in the comprehensive plan. 360 00:26:01,700 --> 00:26:09,780 This is in the exhibits or these graphics here, infographics are from the then 2020 mobility 361 00:26:09,780 --> 00:26:10,780 2022. 362 00:26:10,780 --> 00:26:12,700 Sorry, mobility plan. 363 00:26:12,700 --> 00:26:17,300 And you can see that we'll start with bicycle infrastructure per the plan. 364 00:26:17,300 --> 00:26:27,140 There are 24.4 miles of trails, 15.3 of shared roadways, 9.3 miles of bike lanes. 365 00:26:27,140 --> 00:26:31,900 And then there's urban shoulders which is 2.5 miles and then side paths. 366 00:26:31,900 --> 00:26:36,460 And I think side path is one of those new terms that you probably haven't heard. 367 00:26:36,460 --> 00:26:38,780 I think that's something that we'll see more and more. 368 00:26:38,780 --> 00:26:46,220 I know that our parks department as well as our CIP and our transportation planning staff 369 00:26:46,220 --> 00:26:51,980 is looking to extend or add more side paths as part of new developments that come in. 370 00:26:51,980 --> 00:26:58,220 So our bicycle infrastructure is a lot and one of the main things from the comprehensive 371 00:26:58,220 --> 00:27:02,020 plan is to increase that even more than what we have today. 372 00:27:02,020 --> 00:27:07,780 So those will come as development comes in but we can also be proactive in identifying 373 00:27:07,780 --> 00:27:12,300 areas that we can add more where it makes sense. 374 00:27:12,300 --> 00:27:19,500 In terms of pedestrian infrastructure, we have 451 miles of sidewalks. 375 00:27:19,500 --> 00:27:25,900 Some of them are better than others but we definitely have those that we need to help 376 00:27:25,900 --> 00:27:29,420 maintain but we also look to create more. 377 00:27:29,420 --> 00:27:35,740 So that's something that this comprehensive plan speaks to and this is what the den 2022 378 00:27:35,740 --> 00:27:42,080 mobility plan also speaks to and hopefully we can add that to our system. 379 00:27:42,080 --> 00:27:47,620 Daily migration, I thought this was a really cool infographic, shows that almost the same 380 00:27:47,620 --> 00:27:50,300 amount of people coming in is leaving. 381 00:27:50,300 --> 00:27:56,220 So that was an interesting number to see and then we have folks that just live and work 382 00:27:56,220 --> 00:28:02,660 in den which is I think important as well. 383 00:28:02,660 --> 00:28:11,300 In terms of the mobility major accomplishments, we continue to update our transportation criteria 384 00:28:11,300 --> 00:28:16,660 manual and other criteria manuals to include. 385 00:28:16,660 --> 00:28:23,000 We conducted a citywide speed study and that is exciting because after the speed study 386 00:28:23,000 --> 00:28:31,500 was adopted and approved, the city department, I'm trying to think of the department, I won't 387 00:28:31,500 --> 00:28:36,980 say streets but the department in charge of street signs updated the street, I'm sorry, 388 00:28:36,980 --> 00:28:43,820 the speed limit signs and I believe the number is 193 signs in total and they're also continuing 389 00:28:43,820 --> 00:28:51,020 to add more or work to add more of those updates working with Tech Start as well and getting 390 00:28:51,020 --> 00:28:56,580 those street signs, sorry, speed limit signs updated and ultimately as development comes 391 00:28:56,580 --> 00:29:01,060 in we will make sure that those signs are reflected as well per the speed study. 392 00:29:01,060 --> 00:29:06,260 So again, that's an exciting one that was done last year. 393 00:29:06,260 --> 00:29:12,340 In terms of other projects and programs that are ongoing, again, we talked about or I briefly 394 00:29:12,340 --> 00:29:16,180 discussed that pedestrian, bicycle and transit infrastructure. 395 00:29:16,180 --> 00:29:21,060 We hope to increase more and more as we continue to develop and grow as a city so that is part 396 00:29:21,060 --> 00:29:25,620 of what we will be or we are doing and will be doing in the future. 397 00:29:25,620 --> 00:29:30,340 I'm trying to think of another one here. 398 00:29:30,340 --> 00:29:35,260 I think this is a good one too, number seven is expand electric vehicle fleet and infrastructure. 399 00:29:35,260 --> 00:29:40,260 I know the city is looking at our fleet trucks and see there's ways that we can increase 400 00:29:40,260 --> 00:29:42,780 the number of electric vehicle. 401 00:29:42,780 --> 00:29:50,260 In terms of electric infrastructure, I know that in downtown there is a few electric vehicle 402 00:29:50,260 --> 00:29:51,800 charging stations. 403 00:29:51,800 --> 00:29:57,260 We certainly want to see more but we also have some over at Razor Ranch as well as at 404 00:29:57,260 --> 00:29:58,260 Buc-E's. 405 00:29:58,260 --> 00:30:02,020 I didn't know Buc-E's had some but apparently there are some electric charged vehicle stations 406 00:30:02,020 --> 00:30:05,080 at Buc-E's as well. 407 00:30:05,080 --> 00:30:06,080 Any questions on mobility? 408 00:30:06,080 --> 00:30:07,080 Commissioner Prudt. 409 00:30:07,080 --> 00:30:08,580 Thank you, Chair. 410 00:30:08,580 --> 00:30:15,800 Just real quick, I know we've had challenges in staffing and everything with Vision Zero 411 00:30:15,800 --> 00:30:20,320 moving forward. 412 00:30:20,320 --> 00:30:27,740 Do we envision future updates like this having some KPIs from that Vision Zero study and 413 00:30:27,740 --> 00:30:33,540 being able to track how the safety goals are being accomplished or not? 414 00:30:33,540 --> 00:30:37,460 I know that phase one is completed and there's a phase two and I'm looking to Tina to help 415 00:30:37,460 --> 00:30:39,220 me with that question. 416 00:30:39,220 --> 00:30:40,220 Right. 417 00:30:40,220 --> 00:30:42,620 So we have funded phase two. 418 00:30:42,620 --> 00:30:46,940 We have been delayed getting that started just because we've been trying to help supplement 419 00:30:46,940 --> 00:30:48,500 our transportation planning staff. 420 00:30:48,500 --> 00:30:50,940 So we're making some good headway on that. 421 00:30:50,940 --> 00:30:51,980 I'm happy to report. 422 00:30:51,980 --> 00:30:56,660 So hopefully we'll have some additional staff members next month that will be able to help 423 00:30:56,660 --> 00:30:58,220 supplement our efforts. 424 00:30:58,220 --> 00:31:01,400 But as it relates to Vision Zero, that's one of the key things that we need to move forward 425 00:31:01,400 --> 00:31:03,440 on developing that phase two action plan. 426 00:31:03,440 --> 00:31:07,320 I would anticipate as part of that action plan that there will probably be some key performance 427 00:31:07,320 --> 00:31:12,460 indicators that would be included within that to be able to help be able to understand from 428 00:31:12,460 --> 00:31:17,620 a data standpoint, are we getting closer to our goal of zero fatalities or significant 429 00:31:17,620 --> 00:31:19,380 injuries associated with that? 430 00:31:19,380 --> 00:31:20,380 Okay. 431 00:31:20,380 --> 00:31:21,380 Thank you. 432 00:31:21,380 --> 00:31:22,380 You're welcome. 433 00:31:22,380 --> 00:31:23,380 Great question. 434 00:31:23,380 --> 00:31:24,380 Okay. 435 00:31:24,380 --> 00:31:25,380 Thanks. 436 00:31:25,380 --> 00:31:31,220 Housing and neighborhoods, again, another important element. 437 00:31:31,220 --> 00:31:36,060 This slide just helps illustrate some of the major things that we're working on or have 438 00:31:36,060 --> 00:31:37,940 accomplished. 439 00:31:37,940 --> 00:31:43,740 The affordable housing strategic toolkit is one that I know our community services department 440 00:31:43,740 --> 00:31:49,500 is working on and we'll be seeing some of what they're working on in the next, hopefully 441 00:31:49,500 --> 00:31:51,740 next couple of months. 442 00:31:51,740 --> 00:31:56,680 Of course, the famous illustration that I think everybody has seen already, the missing 443 00:31:56,680 --> 00:32:03,100 middle housing, our big strategic, I'm sorry, our big key action in the comprehensive plan 444 00:32:03,100 --> 00:32:11,460 is to increase our housing options, increase our housing types. 445 00:32:11,460 --> 00:32:19,020 That is something that you'll see in the comprehensive plan and you'll see as part of the key actions 446 00:32:19,020 --> 00:32:26,180 is to make sure that we provide those types of housing as well as those options available 447 00:32:26,180 --> 00:32:28,220 to our community. 448 00:32:28,220 --> 00:32:35,900 The other two illustrates here is a sample of what tiny homes could be, so just another 449 00:32:35,900 --> 00:32:38,820 example of another option. 450 00:32:38,820 --> 00:32:45,300 This photo over here is a model home over at Eagle Creek, that's a division just south 451 00:32:45,300 --> 00:32:46,300 of I-35. 452 00:32:46,300 --> 00:32:52,740 I thought it was a good representation of some of the housing that we're seeing. 453 00:32:52,740 --> 00:32:59,380 So in Den, obviously you all know that the city's growing, the housing demand is high 454 00:32:59,380 --> 00:33:03,500 not only for the DFW but for this city as well. 455 00:33:03,500 --> 00:33:10,300 Our comprehensive plan looks to add or is projecting to add roughly 37,000 more housing 456 00:33:10,300 --> 00:33:12,460 by 2040. 457 00:33:12,460 --> 00:33:18,360 I think with some of the big developments like coal and hunter, I think that can be 458 00:33:18,360 --> 00:33:23,460 quickly done but there's still obviously other areas of the city that we're seeing growth 459 00:33:23,460 --> 00:33:24,600 and housing as well. 460 00:33:24,600 --> 00:33:33,160 So again, housing in neighborhoods, some of the major accomplishments again is expanding 461 00:33:33,160 --> 00:33:34,340 our housing options. 462 00:33:34,340 --> 00:33:44,700 I know in the year 2022 we approved roughly close to 1,400 permits for housing and those 463 00:33:44,700 --> 00:33:50,860 range again from single family, there are some duplexes but mainly single family and 464 00:33:50,860 --> 00:33:54,340 those range in different sizes. 465 00:33:54,340 --> 00:33:59,620 Expand the availability of affordable housing, again with the affordable strategic toolkit 466 00:33:59,620 --> 00:34:01,740 that community services are working on. 467 00:34:01,740 --> 00:34:08,780 There are a number of examples that they're hoping to accomplish and so I know with multifamily 468 00:34:08,780 --> 00:34:14,140 I believe that number is around, I want to say there's 12 permits that were approved 469 00:34:14,140 --> 00:34:19,700 but 2,600 units associated with those 12 permits from what I recall. 470 00:34:19,700 --> 00:34:25,760 So again, housing is, we're continuing to see more housing develop but I think part 471 00:34:25,760 --> 00:34:32,660 of what we would like to see also is the types and the additional options that are available 472 00:34:32,660 --> 00:34:36,260 is expanded even more. 473 00:34:36,260 --> 00:34:43,140 In terms of the projects that are being worked on, you know, meeting the demands and diversity 474 00:34:43,140 --> 00:34:48,340 of housing choices, community services, I mentioned that, they're working on that as 475 00:34:48,340 --> 00:34:51,420 part of their strategic plan. 476 00:34:51,420 --> 00:34:57,020 As far as the other, establish a rental housing and multifamily inspection and registration 477 00:34:57,020 --> 00:35:02,340 program, I know some of that has started but part of that has not yet started so I believe 478 00:35:02,340 --> 00:35:08,780 the rental housing inspection has started but the registration program has not. 479 00:35:08,780 --> 00:35:12,060 But again, that's something that community services is working on. 480 00:35:12,060 --> 00:35:18,500 In addition, they are also working on the, addressing the needs for DEN's homeless population 481 00:35:18,500 --> 00:35:25,820 as well in a number of key tasks. 482 00:35:25,820 --> 00:35:31,940 Community health services and safety and services that is, I provided these photos here to kind 483 00:35:31,940 --> 00:35:36,140 of give you an idea of what we have been doing as a city. 484 00:35:36,140 --> 00:35:44,020 I'll start over here, the top left, and that is the DEN police substation on vintage. 485 00:35:44,020 --> 00:35:47,860 Hopefully some of you may have driven by it, I've seen it. 486 00:35:47,860 --> 00:35:54,980 That was recently opened, I believe it was April of this year. 487 00:35:54,980 --> 00:36:00,820 This is the, I'm going to blank on this one, I remember the name but it's on loop 288 is 488 00:36:00,820 --> 00:36:07,180 the homeless, maybe it's not the homeless. 489 00:36:07,180 --> 00:36:14,580 It's not our daily bread, it's called something else and I apologize, let me see if I. 490 00:36:14,580 --> 00:36:18,460 It's a city facility that assists people with needs and housing, I don't have the exact 491 00:36:18,460 --> 00:36:22,580 name but it is in partnership with our daily bread, they provide support. 492 00:36:22,580 --> 00:36:23,580 That's right, okay. 493 00:36:23,580 --> 00:36:26,580 When I find it, I'll let you all know. 494 00:36:26,580 --> 00:36:32,220 So yeah, that one just was late 2022, so that opened up and again, that's a great addition 495 00:36:32,220 --> 00:36:38,940 to the city and again, assisting our community that are in need. 496 00:36:38,940 --> 00:36:44,420 The bottom left here, just to just illustrate that our parks department is working on expanding 497 00:36:44,420 --> 00:36:49,100 the program of community gardens throughout the city. 498 00:36:49,100 --> 00:36:53,860 Bowling Green is another area that has a community garden, but Child Field is also part of that 499 00:36:53,860 --> 00:37:02,100 and part of the parks department's effort is also to help expand the use of community 500 00:37:02,100 --> 00:37:04,300 gardens throughout the city of Den. 501 00:37:04,300 --> 00:37:10,460 And then the bottom right here has not been built yet, or it's being built as we speak. 502 00:37:10,460 --> 00:37:17,220 It's the, let me ask a question, what number is our next fire station? 503 00:37:17,220 --> 00:37:18,220 Does anybody know? 504 00:37:18,220 --> 00:37:20,500 Is it number eight? 505 00:37:20,500 --> 00:37:21,500 No? 506 00:37:21,500 --> 00:37:22,500 Close. 507 00:37:22,500 --> 00:37:23,500 Is it nine? 508 00:37:23,500 --> 00:37:24,500 Okay. 509 00:37:24,500 --> 00:37:33,220 So number nine will be our, yeah, okay, there's no prize. 510 00:37:33,220 --> 00:37:38,240 Yeah, no prize, no prize. 511 00:37:38,240 --> 00:37:43,220 It's located at the Den Municipal Airport, Enterprise Airport, so that'll be exciting 512 00:37:43,220 --> 00:37:44,220 to have one there. 513 00:37:44,220 --> 00:37:48,820 Obviously, that's going to increase the protection of that area in terms of fire, but also have 514 00:37:48,820 --> 00:37:53,460 it available for the airport if for whatever reason there is a need. 515 00:37:53,460 --> 00:37:58,160 But that is scheduled to be completed in May or April or May of 2024. 516 00:37:58,160 --> 00:38:01,820 So I know they're working hard to get them, and it's right next to the terminal. 517 00:38:01,820 --> 00:38:06,940 So it's a great location and central to the airport area. 518 00:38:06,940 --> 00:38:10,500 It's called Denton's Community Shelter, operated by Our Daily Bread. 519 00:38:10,500 --> 00:38:11,500 Great. 520 00:38:11,500 --> 00:38:12,720 Thank you. 521 00:38:12,720 --> 00:38:15,180 Thank you, Dina. 522 00:38:15,180 --> 00:38:20,660 As far as community health safety, we do have a lot under major accomplishments. 523 00:38:20,660 --> 00:38:27,780 Obviously, the police and fire have received a number of accreditation, accreditation, 524 00:38:27,780 --> 00:38:28,780 accreditation, sorry. 525 00:38:28,780 --> 00:38:30,620 Yeah, there you go. 526 00:38:30,620 --> 00:38:37,180 Also, we talked about the services at Loop 288 that Tina just referenced. 527 00:38:37,180 --> 00:38:39,020 So that was accomplished. 528 00:38:39,020 --> 00:38:40,980 That's a major accomplishment. 529 00:38:40,980 --> 00:38:47,540 As far as projects and programs currently in progress, we have a number of activities. 530 00:38:47,540 --> 00:38:53,020 We talked about the gardens, community gardens, but also overall is really just making sure 531 00:38:53,020 --> 00:38:58,860 that our public service departments are being able to do what they do. 532 00:38:58,860 --> 00:39:06,780 And so they're continuing to make efforts to make sure that their services are available 533 00:39:06,780 --> 00:39:13,500 and within the framework of what needs to be done in terms of federal and state standards. 534 00:39:13,500 --> 00:39:18,740 So look, they're going. 535 00:39:18,740 --> 00:39:20,780 Infrastructure and utilities, this is the last element. 536 00:39:20,780 --> 00:39:24,780 So after this, we'll be done. 537 00:39:24,780 --> 00:39:29,460 So I wanted to share some of the major road work. 538 00:39:29,460 --> 00:39:32,380 Now there are a number of other road works throughout the city. 539 00:39:32,380 --> 00:39:38,540 And I encourage you to go to our city website under Improving Den and you'll see that there's 540 00:39:38,540 --> 00:39:43,860 a number of projects that the city is working on, not just the big projects like this, but 541 00:39:43,860 --> 00:39:48,060 also neighborhood projects throughout the city as well. 542 00:39:48,060 --> 00:39:51,940 So the first one is the Mayhill Road phase two. 543 00:39:51,940 --> 00:39:59,380 And for those that aren't familiar, phase one is basically between US 380 and just south 544 00:39:59,380 --> 00:40:00,380 of Spencer. 545 00:40:00,380 --> 00:40:03,140 So the landfill is off of this photo. 546 00:40:03,140 --> 00:40:08,340 So the landfill is over here and phase one ends roughly around here. 547 00:40:08,340 --> 00:40:18,620 Phase two is going to be the construction of a Mayhill extending over the railroad tracks 548 00:40:18,620 --> 00:40:24,820 and then down and then reconnecting to where, again, the existing phase one completion is 549 00:40:24,820 --> 00:40:25,820 located. 550 00:40:25,820 --> 00:40:26,820 So this is phase two. 551 00:40:26,820 --> 00:40:32,020 So this segment between where it currently ends here is just south of Spencer all the 552 00:40:32,020 --> 00:40:37,820 way through, I want to say Colorado, but I think they may extend all the way to I-35, 553 00:40:37,820 --> 00:40:39,540 but that might be a different project. 554 00:40:39,540 --> 00:40:43,460 But this project right here that you're seeing here is phase two. 555 00:40:43,460 --> 00:40:51,740 So again, that area where it currently is a four-way stop, no, a three-way stop, extends 556 00:40:51,740 --> 00:40:58,400 over again the railroad tracks and then again realigns back to the main Mayhill look alignment, 557 00:40:58,400 --> 00:40:59,400 that is phase two. 558 00:40:59,400 --> 00:41:02,860 So that is something that is upcoming and that is something that is being worked on 559 00:41:02,860 --> 00:41:04,980 as we speak. 560 00:41:04,980 --> 00:41:13,100 The other area that's on this side here which is will be the old Mayhill will be part of 561 00:41:13,100 --> 00:41:18,900 phase three and that will come in soon after phase two or right around the same time. 562 00:41:18,900 --> 00:41:25,700 So again, just to illustrate where that is, what is happening along this part of the city. 563 00:41:25,700 --> 00:41:30,780 The other part of the city is the Bonnie Bray widening project. 564 00:41:30,780 --> 00:41:37,380 Currently the phase one and two is complete, so the area here on Vintage and the part of 565 00:41:37,380 --> 00:41:42,380 Bonnie Bray through this area here, I think that was either Rose Lawn Drive, yeah, that's 566 00:41:42,380 --> 00:41:46,940 Rose Lawn Drive, that is where phase one and that is completed. 567 00:41:46,940 --> 00:41:50,420 Phase three and four, five and six are forthcoming. 568 00:41:50,420 --> 00:41:56,900 I know that the design and work on phase three is being drafted or being completed as we 569 00:41:56,900 --> 00:42:05,020 speak, so that will be the next phase for the capital projects team. 570 00:42:05,020 --> 00:42:10,940 Some of the major accomplishments include the work that the city as well as the county 571 00:42:10,940 --> 00:42:18,660 is doing in terms of roadway work, also the continuing road work widening, I talked about 572 00:42:18,660 --> 00:42:25,500 Bonnie Bray, I talked about Mayhill, Mayhill, the phase one that is, so that is all done. 573 00:42:25,500 --> 00:42:30,740 There are other capital projects that the city is working on, again, those are all provided 574 00:42:30,740 --> 00:42:37,260 under Improving Den, so that's a really good website to visit if you want to learn more 575 00:42:37,260 --> 00:42:42,660 about what's going on in terms of roadway widening projects. 576 00:42:42,660 --> 00:42:47,300 In terms of the other projects and programs that are currently being worked on, I know 577 00:42:47,300 --> 00:42:53,240 that I'm just going to pick a few here, street lighting standards, D&E will be bringing forward 578 00:42:53,240 --> 00:43:00,420 some of that recommendations to the DCRC and ultimately to PNZ and City Council. 579 00:43:00,420 --> 00:43:07,740 I know our water and waste water folks are working on master plans as we speak, the water 580 00:43:07,740 --> 00:43:13,020 utility department is working on a one water plan I believe is called, there's also a waste 581 00:43:13,020 --> 00:43:18,900 water master plan being drafted as well, I think it's just initially started, and then 582 00:43:18,900 --> 00:43:22,660 there's also the storm water master plan, so there's a lot of master plans being drafted 583 00:43:22,660 --> 00:43:28,700 as part, again, what was called out in the Den 24 Conference of Plan. 584 00:43:28,700 --> 00:43:32,820 And then I think the last one here, the last number nine, complete all remaining projects 585 00:43:32,820 --> 00:43:37,900 associated with the 2012 and 2014 bond capital projects, something that they wanted me to 586 00:43:37,900 --> 00:43:42,620 make sure that you all understood that they're working on that and they're actually doing 587 00:43:42,620 --> 00:43:50,660 a lot of work to get those projects completed, so a lot of work being done as we speak in 588 00:43:50,660 --> 00:43:55,780 terms of infrastructure and utilities. 589 00:43:55,780 --> 00:44:02,960 So in conclusion, I apologize for running really fast here, but major accomplishments, 590 00:44:02,960 --> 00:44:09,700 we looked at the Conference of Plan and we identified 23 key actions, about 9 percent 591 00:44:09,700 --> 00:44:14,820 of what we have completed so far, and that's just under the first year, so hopefully as 592 00:44:14,820 --> 00:44:20,620 the years progress, we'll continue to add more actions to that list. 593 00:44:20,620 --> 00:44:25,860 Projects and programs, approximately 150 key actions, about 60 percent are currently being 594 00:44:25,860 --> 00:44:26,860 worked on. 595 00:44:26,860 --> 00:44:33,300 The remaining actions are either not started or either ongoing or need a little bit more 596 00:44:33,300 --> 00:44:40,760 time to get going, either due to funding or staffing, but those are also being monitored 597 00:44:40,760 --> 00:44:46,580 and hopefully we can share with you at our next update a little bit more on what's happening 598 00:44:46,580 --> 00:44:51,820 with those actions that are not listed or was not listed in your backup. 599 00:44:51,820 --> 00:44:59,760 Last bullet here, last segment is the city has started a program or has a software program 600 00:44:59,760 --> 00:45:07,960 that monitors and allows the city departments to track where certain initiatives, key actions, 601 00:45:07,960 --> 00:45:15,540 city actions as well, where they are in terms of their progress. 602 00:45:15,540 --> 00:45:20,620 So Invisio is the software program that allows us to do that. 603 00:45:20,620 --> 00:45:28,100 What's really neat about Invisio is that we can include a number of key actions or strategies 604 00:45:28,100 --> 00:45:35,220 or initiatives from multiple plans and we're able to link them, so if there is an action 605 00:45:35,220 --> 00:45:42,820 or a strategy that's similar, we can have one, an ability to just enter one entry and 606 00:45:42,820 --> 00:45:49,020 that would then supplement or supply the answer to those strategies or in progress of those 607 00:45:49,020 --> 00:45:52,720 strategies at one time rather than having to do them multiple times. 608 00:45:52,720 --> 00:46:00,040 So I think when we come back next year, I know we will, we'll have Invisio up and running 609 00:46:00,040 --> 00:46:05,220 and we'll share with you some of the data and the results that come out of that exercise. 610 00:46:05,220 --> 00:46:10,180 It'll be a lot more easier way of presenting and understanding some of the key action because 611 00:46:10,180 --> 00:46:16,260 now we can also look at other plans and identify how those are doing in relationship to the 612 00:46:16,260 --> 00:46:19,760 key actions that are in our comprehensive plan. 613 00:46:19,760 --> 00:46:25,160 So with that, that concludes my presentation and I'll be happy to answer any questions. 614 00:46:25,160 --> 00:46:30,540 Thank you, Ron, Commissioner McDeid. 615 00:46:30,540 --> 00:46:31,540 Thank you, Chair. 616 00:46:31,540 --> 00:46:35,700 Ron, if you could go back to your first slide where you had the northeast, southeast and 617 00:46:35,700 --> 00:46:36,700 the downtown. 618 00:46:36,700 --> 00:46:37,700 Yes, sir. 619 00:46:37,700 --> 00:46:39,980 I just have a quick question about the downtown area. 620 00:46:39,980 --> 00:46:44,580 I know it's not, it hasn't started yet, but is there any way you could tell me like how 621 00:46:44,580 --> 00:46:49,620 far that stretches on all four sides as far as street name-wise, you know? 622 00:46:49,620 --> 00:46:50,620 For southeast? 623 00:46:50,620 --> 00:46:51,780 No, no, for the downtown. 624 00:46:51,780 --> 00:46:52,780 For downtown? 625 00:46:52,780 --> 00:46:53,780 We don't, we don't know. 626 00:46:53,780 --> 00:46:55,780 I think U.S. 380- That's to be determined. 627 00:46:55,780 --> 00:46:56,780 Yeah, yeah. 628 00:46:56,780 --> 00:47:04,420 I think if you're looking at the map, I think 380, U.S. University would be the most northern 629 00:47:04,420 --> 00:47:09,260 one, but as far as the east, west and south, it's still not known. 630 00:47:09,260 --> 00:47:10,260 Okay. 631 00:47:10,260 --> 00:47:11,260 Yeah. 632 00:47:11,260 --> 00:47:13,580 But I know 380 would probably be where we would cut it out there. 633 00:47:13,580 --> 00:47:14,580 All right. 634 00:47:14,580 --> 00:47:18,300 Well, and the reason why the boundaries are undetermined at this time, because we will 635 00:47:18,300 --> 00:47:23,760 have extensive public engagement that will be involved in helping us identify what the 636 00:47:23,760 --> 00:47:25,300 boundaries should be. 637 00:47:25,300 --> 00:47:29,820 Obviously, we have the existing downtown master plan, but there may be some conversation about 638 00:47:29,820 --> 00:47:34,580 whether or not that area needs to be grown, just like on southeast and on southeast with 639 00:47:34,580 --> 00:47:38,540 all of our public engagement activities, we're really listening to the community to understand 640 00:47:38,540 --> 00:47:42,420 with them as to what they consider the boundaries of Southeast Denton to be. 641 00:47:42,420 --> 00:47:46,260 So it's really going to be public engagement driven to help us with that answer. 642 00:47:46,260 --> 00:47:47,260 Okay. 643 00:47:47,260 --> 00:47:48,260 That's the answer I was looking for. 644 00:47:48,260 --> 00:47:49,260 Great. 645 00:47:49,260 --> 00:47:50,260 Thank you. 646 00:47:50,260 --> 00:47:51,260 All right. 647 00:47:51,260 --> 00:47:52,260 Anybody else? 648 00:47:52,260 --> 00:47:53,260 Commissioner Pruitt. 649 00:47:53,260 --> 00:47:54,260 Thank you, Chair. 650 00:47:54,260 --> 00:47:55,260 Hopefully two quick questions. 651 00:47:55,260 --> 00:48:04,020 One, I heard you talk about the stormwater master plan, which is ongoing. 652 00:48:04,020 --> 00:48:13,540 Are we investigating just having planning or development staff in those conversations 653 00:48:13,540 --> 00:48:25,540 to see whether allowing stormwater management in pooled areas or certain mitigation fees 654 00:48:25,540 --> 00:48:33,660 in lieu of things that are required would also aid our infill and redevelopment activities? 655 00:48:33,660 --> 00:48:38,380 Is that something that's ongoing or is that something that might not start until after 656 00:48:38,380 --> 00:48:40,340 the stormwater plan is complete? 657 00:48:40,340 --> 00:48:45,620 I think every opportunity we can provide input, I think, would be -- I'm just reading the 658 00:48:45,620 --> 00:48:54,500 notes here, states that engineering is currently managing the draft of the stormwater master 659 00:48:54,500 --> 00:48:55,500 plan. 660 00:48:55,500 --> 00:48:57,220 I can certainly follow up. 661 00:48:57,220 --> 00:49:02,140 I know that with regards to the water and wastewater master plan, we have been involved 662 00:49:02,140 --> 00:49:07,540 because actually part of their plan is to understand what the city's growth is and so 663 00:49:07,540 --> 00:49:08,780 they can plan ahead. 664 00:49:08,780 --> 00:49:13,540 I think similarly, the stormwater master plan should have something to that effect. 665 00:49:13,540 --> 00:49:18,500 But specifically to your question, we have not had that discussion, but we certainly 666 00:49:18,500 --> 00:49:21,700 can make that as part of the plan being drafted. 667 00:49:21,700 --> 00:49:29,140 Yeah, it's more just a question if staff feels like looking into that, just because I know 668 00:49:29,140 --> 00:49:35,660 sometimes that stormwater infrastructure can be nonlinear in cost as far as you get economies 669 00:49:35,660 --> 00:49:36,980 of scale and that sort of thing. 670 00:49:36,980 --> 00:49:42,660 If there's opportunities to take some steps forward and some other goals by looking at 671 00:49:42,660 --> 00:49:45,900 that, that may be helpful. 672 00:49:45,900 --> 00:49:52,280 Second question, and you're at the slide now, so thank you, Commissioner McDade, mud policy. 673 00:49:52,280 --> 00:49:58,160 So I will admit I didn't actually go back and find the past mud policy that was passed, 674 00:49:58,160 --> 00:50:08,120 but I know that we had a couple of confusing plat applications and conditional, reconditional 675 00:50:08,120 --> 00:50:14,900 approvals that happened because there was uncertainty in street design standards and 676 00:50:14,900 --> 00:50:18,500 county accepting and approving. 677 00:50:18,500 --> 00:50:27,860 I guess my question is, did that final mud policy account for those confusions so that 678 00:50:27,860 --> 00:50:32,260 we'll have fewer of them going forward, or is that something we still need to work through? 679 00:50:32,260 --> 00:50:37,460 So the policy is that, it's just a policy, it's not a technical design manual. 680 00:50:37,460 --> 00:50:43,380 But the policy does speak to, it encourages that development would occur in accordance 681 00:50:43,380 --> 00:50:46,020 with the city's design specifications and standards. 682 00:50:46,020 --> 00:50:52,100 So part of that conversation is whether or not the developments that are being done as 683 00:50:52,100 --> 00:50:55,780 municipal utility districts will eventually want to annex into the city. 684 00:50:55,780 --> 00:50:59,980 And if they are, then we're interested in understanding or providing some direction 685 00:50:59,980 --> 00:51:04,020 in terms of, at least with the infrastructure that they're being built in accordance with 686 00:51:04,020 --> 00:51:05,340 our city design requirements. 687 00:51:05,340 --> 00:51:11,120 So that way we know what we're inheriting at such point in time when they, if they do 688 00:51:11,120 --> 00:51:13,260 choose to move forward with annexation. 689 00:51:13,260 --> 00:51:19,320 So it's really that policy encourages the developments to develop consistent with our 690 00:51:19,320 --> 00:51:22,980 design requirements that we have in place. 691 00:51:22,980 --> 00:51:28,420 And I was trying to think what else we included in there, but it really provides the framework 692 00:51:28,420 --> 00:51:29,740 and in helping have the conversation. 693 00:51:29,740 --> 00:51:33,220 I don't know if you recall when we, I might have given a presentation to the commission 694 00:51:33,220 --> 00:51:38,140 probably last year when we were working on this and really the goal is eventually to 695 00:51:38,140 --> 00:51:42,140 work with the mud developers and to enter into development agreements. 696 00:51:42,140 --> 00:51:48,320 So it's very clear in terms of how the infrastructure is being designed and are they providing development 697 00:51:48,320 --> 00:51:51,540 aspects that are more in alignment with some of our conference of plan goals and some of 698 00:51:51,540 --> 00:51:53,940 our design goals. 699 00:51:53,940 --> 00:51:57,820 We've been very fortunate with some of the conversations that we've had with the mud 700 00:51:57,820 --> 00:52:00,940 developers that they're very open to that. 701 00:52:00,940 --> 00:52:07,340 And in such that we're also having conversations regarding with utilities that are B that they're 702 00:52:07,340 --> 00:52:13,060 having to construct, with those B utilities that the city is eventually inheriting. 703 00:52:13,060 --> 00:52:14,640 And if so, what that might look like. 704 00:52:14,640 --> 00:52:20,580 So it's really our goal is to help work with them and steer us to design requirements that 705 00:52:20,580 --> 00:52:25,180 are, or are having them build infrastructure that is consistent with our design requirements. 706 00:52:25,180 --> 00:52:28,980 Because at the end of the day, if we're ultimately going to be responsible for maintaining them, 707 00:52:28,980 --> 00:52:33,380 especially if they choose to annex into the city, we want to know what we're receiving. 708 00:52:33,380 --> 00:52:37,660 So did that answer your question, Mr. Prout? 709 00:52:37,660 --> 00:52:38,660 Okay. 710 00:52:38,660 --> 00:52:39,660 Okay. 711 00:52:39,660 --> 00:52:40,660 Commissioner Cole. 712 00:52:40,660 --> 00:52:41,660 Thank you, chair. 713 00:52:41,660 --> 00:52:45,620 So you hear a lot of, is this voluntary or is there teeth in this enforcement for these 714 00:52:45,620 --> 00:52:46,620 mud districts? 715 00:52:46,620 --> 00:52:55,140 Um, could that, so, I mean- They, so, um, we, we encourage them to enter 716 00:52:55,140 --> 00:52:57,740 into development agreement, but that doesn't necessarily mean they have to. 717 00:52:57,740 --> 00:52:58,740 They have to. 718 00:52:58,740 --> 00:52:59,740 So, right. 719 00:52:59,740 --> 00:53:00,740 It's, it's a negotiation, right? 720 00:53:00,740 --> 00:53:02,320 We kind of know what we're getting with these mud districts. 721 00:53:02,320 --> 00:53:08,100 We're getting water wells, septic, propane, that's what we're getting. 722 00:53:08,100 --> 00:53:11,540 And that's if, and you're right, they have the ability to be able to develop in that 723 00:53:11,540 --> 00:53:12,540 nature. 724 00:53:12,540 --> 00:53:17,500 Um, but we have been very fortunate with some of the mud developers, um, the Legends development 725 00:53:17,500 --> 00:53:21,980 is a great example where they entered into development agreement with the city and committed 726 00:53:21,980 --> 00:53:25,300 to building infrastructure in accordance with some of our design requirements. 727 00:53:25,300 --> 00:53:30,940 So because they do have an interest in eventually having that neighborhood annex into the city. 728 00:53:30,940 --> 00:53:35,380 So, um, we were able to work with them and put together a development agreement, um, 729 00:53:35,380 --> 00:53:38,820 so that it outlines how their utilities will be provided. 730 00:53:38,820 --> 00:53:43,300 Because in some cases, you know, they, they may be building their own package systems, 731 00:53:43,300 --> 00:53:48,940 but ultimately they see the benefit of being a part of the city's waters, especially the 732 00:53:48,940 --> 00:53:54,220 city's water system, because if their water source is otherwise groundwater or they're 733 00:53:54,220 --> 00:53:59,780 drilling wells, then they're, they also recognize that longer term, that water source may not 734 00:53:59,780 --> 00:54:00,780 be guaranteed. 735 00:54:00,780 --> 00:54:04,740 So hence why they're interested in, in how they can set up their system to be able to 736 00:54:04,740 --> 00:54:06,260 connect to the city's water system. 737 00:54:06,260 --> 00:54:11,700 Okay. That's the, that's the key thing because these are all these mud districts are drilling 738 00:54:11,700 --> 00:54:12,700 into the plexi. 739 00:54:12,700 --> 00:54:14,820 That's where they're all getting their water. 740 00:54:14,820 --> 00:54:21,180 I get my water from the plexi and all the well people that have been digging wells in 741 00:54:21,180 --> 00:54:28,060 this county for 60 years, I'll tell you, I may see the plexi drop in my lifetime. 742 00:54:28,060 --> 00:54:29,980 Never thought I would before. 743 00:54:29,980 --> 00:54:38,060 So a transition from their well system to the city water is what you're saying. 744 00:54:38,060 --> 00:54:39,060 Right. 745 00:54:39,060 --> 00:54:44,060 So with these developments, we work with them to understand how they're designing their 746 00:54:44,060 --> 00:54:49,860 utility system, because ultimately if their goal is to tie into our water system for a 747 00:54:49,860 --> 00:54:54,660 much more reliable source of water being provided for them for the longer term, then we want 748 00:54:54,660 --> 00:54:56,300 to be part of that conversation. 749 00:54:56,300 --> 00:55:01,500 And so, so far we've, we've benefited from MED developers coming and meeting with us 750 00:55:01,500 --> 00:55:05,820 and, and having those bigger picture conversations, right. 751 00:55:05,820 --> 00:55:09,060 They're going to make investments in infrastructure anyway. 752 00:55:09,060 --> 00:55:14,540 So what does that look like and is there an opportunity for, especially if they're wanting 753 00:55:14,540 --> 00:55:19,980 to tie into the city system, how, how does that occur, right? 754 00:55:19,980 --> 00:55:24,340 Putting a plan in place so we know how that occurs and then also so that their utility 755 00:55:24,340 --> 00:55:25,860 system syncs up with ours. 756 00:55:25,860 --> 00:55:30,340 So, but that, that, that will theoretically be on their dime, not ours. 757 00:55:30,340 --> 00:55:31,340 Correct. 758 00:55:31,340 --> 00:55:32,340 Right. 759 00:55:32,340 --> 00:55:33,340 I mean, presumably, yes. 760 00:55:33,340 --> 00:55:37,300 So it is, you know, they're having to make infrastructure investments, right? 761 00:55:37,300 --> 00:55:42,140 So it's, it's part of that conversation is, is how do we leverage that infrastructure 762 00:55:42,140 --> 00:55:43,540 investment that they're making? 763 00:55:43,540 --> 00:55:48,380 So and, and it's just, you know, and then it goes from there. 764 00:55:48,380 --> 00:55:49,380 Thank you. 765 00:55:49,380 --> 00:55:54,300 Anybody else, Ron, thank you for putting all this together. 766 00:55:54,300 --> 00:55:55,300 It's a lot of information. 767 00:55:55,300 --> 00:55:56,300 Thank you. 768 00:55:56,300 --> 00:56:00,380 It is a great presentation and I'm glad this is being done annually. 769 00:56:00,380 --> 00:56:01,380 I think it's super important. 770 00:56:01,380 --> 00:56:02,380 Yeah. 771 00:56:02,380 --> 00:56:05,120 I think that's something that we established, you know, when we updated the conference plans 772 00:56:05,120 --> 00:56:08,220 that we come back to the planning zoning commission as the sounding board. 773 00:56:08,220 --> 00:56:13,540 So there's something that, you know, you guys see or want more information on, we certainly 774 00:56:13,540 --> 00:56:14,540 can bring it forward. 775 00:56:14,540 --> 00:56:15,540 Excellent. 776 00:56:15,540 --> 00:56:16,540 Thank you so much. 777 00:56:16,540 --> 00:56:17,540 If I can add to that, sure. 778 00:56:17,540 --> 00:56:18,540 I'll add so. 779 00:56:18,540 --> 00:56:19,540 If it's quickly because it's 626. 780 00:56:19,540 --> 00:56:20,540 Absolutely. 781 00:56:20,540 --> 00:56:24,580 So I know there's food waiting for us also and Ron touched on this in his presentation, 782 00:56:24,580 --> 00:56:28,580 but once we get all of this uploaded into the Invisio software, then you can, you can 783 00:56:28,580 --> 00:56:30,020 check this at any time, right? 784 00:56:30,020 --> 00:56:34,220 You don't have to wait for annual updates from us and, and yes, kudos to Ron. 785 00:56:34,220 --> 00:56:37,660 He did a tremendous job on pulling all this information together. 786 00:56:37,660 --> 00:56:41,220 Working with the other departments, we thank them also because we know it, it took some 787 00:56:41,220 --> 00:56:44,200 time for them to be able to provide us all this information. 788 00:56:44,200 --> 00:56:46,180 So he's done a fabulous job on this. 789 00:56:46,180 --> 00:56:47,780 I absolutely agree. 790 00:56:47,780 --> 00:56:48,780 Thank you. 791 00:56:48,780 --> 00:56:49,780 Thank you very much. 792 00:56:49,780 --> 00:56:55,540 With that, I'll adjourn our work session at 627 and we will reconvene as soon as we can 793 00:56:55,540 --> 00:56:58,780 get to city hall and open the public meeting. 794 00:56:58,780 --> 00:57:05,660 Good evening and welcome to the city of Denton's planning and zoning commission meeting for 795 00:57:05,660 --> 00:57:09,220 Wednesday, June 14th, 2023. 796 00:57:09,220 --> 00:57:13,000 With a quorum present, I will call us to order at 650 PM. 797 00:57:13,000 --> 00:57:14,180 Thank you for your patience. 798 00:57:14,180 --> 00:57:17,580 Sorry, we are delayed in getting our meeting started. 799 00:57:17,580 --> 00:57:24,140 First item on our agenda is the pledge to the U.S. and Texas Flags. 800 00:57:24,140 --> 00:57:30,180 I pledge allegiance to the flag of the United States of America and to the republic for 801 00:57:30,180 --> 00:57:38,300 which it stands, one nation, under God, indivisible, with liberty and justice for all. 802 00:57:38,300 --> 00:57:48,540 Under the Texas flag, I pledge allegiance to the Texas one state, under God, one and indivisible. 803 00:57:48,540 --> 00:57:49,540 Thank you. 804 00:57:49,540 --> 00:57:54,940 And before we get started with our agenda, I just wanted to let everyone who's here and 805 00:57:54,940 --> 00:58:03,140 also watching that our two public hearing items for this evening, 5A and 5B, are both 806 00:58:03,140 --> 00:58:09,140 being postponed, so we will not be taking action on those items this evening. 807 00:58:09,140 --> 00:58:15,260 And with that, our first item we are taking action on is 2A, approval of our May 24th 808 00:58:15,260 --> 00:58:16,900 planning and zoning minutes. 809 00:58:16,900 --> 00:58:17,900 Commissioner Smith. 810 00:58:17,900 --> 00:58:19,260 Make a motion to approve. 811 00:58:19,260 --> 00:58:20,260 Commissioner Villarreal. 812 00:58:20,260 --> 00:58:21,260 Second. 813 00:58:21,260 --> 00:58:23,100 We've got a first and a second for approval. 814 00:58:23,100 --> 00:58:26,340 Any discussion? 815 00:58:26,340 --> 00:58:34,220 Let's vote on the board, please. 816 00:58:34,220 --> 00:58:36,100 That motion carries 7-0. 817 00:58:36,100 --> 00:58:39,740 That will move us to our consent agenda for this evening. 818 00:58:39,740 --> 00:58:40,860 Commissioner Villarreal. 819 00:58:40,860 --> 00:58:42,900 I move approval. 820 00:58:42,900 --> 00:58:43,900 Commissioner Anderson. 821 00:58:43,900 --> 00:58:44,900 Second. 822 00:58:44,900 --> 00:58:48,100 We've got a first and a second for approval of the consent agenda. 823 00:58:48,100 --> 00:58:49,100 Any discussion? 824 00:58:49,100 --> 00:58:57,380 Okay, let's vote on the board, please. 825 00:58:57,380 --> 00:58:59,060 That motion carries 7-0. 826 00:58:59,060 --> 00:59:05,460 That will take us to items for individual consideration for ASPP 230014. 827 00:59:05,460 --> 00:59:08,660 I'll invite Sean Jacobson up for presentation. 828 00:59:08,660 --> 00:59:09,660 Hi, Sean. 829 00:59:09,660 --> 00:59:19,460 Members of the commission, let's pull up presentation here. 830 00:59:19,460 --> 00:59:21,460 Okay. 831 00:59:21,460 --> 00:59:25,220 There we go. 832 00:59:25,220 --> 00:59:26,220 All right. 833 00:59:26,220 --> 00:59:31,500 This is a proposed preliminary plat for the Mayhill addition. 834 00:59:31,500 --> 00:59:37,100 This is an approximately 32-acre site off Mayhill Road, north of the intersection of 835 00:59:37,100 --> 00:59:39,620 Mayhill and Quail Creek. 836 00:59:39,620 --> 00:59:43,300 Currently, staff is recommending denial of this plat because it does not meet the approval 837 00:59:43,300 --> 00:59:44,300 criteria. 838 00:59:44,300 --> 00:59:50,100 However, staff has no objection to the request of 30-day extension to June 28, 2023, and 839 00:59:50,100 --> 00:59:53,540 I'm happy to answer any questions about this plat. 840 00:59:53,540 --> 00:59:54,540 Thank you, Sean. 841 00:59:54,540 --> 00:59:55,540 Any questions? 842 00:59:55,540 --> 00:59:57,620 I don't see any. 843 00:59:57,620 --> 00:59:58,620 Thank you so much. 844 00:59:58,620 --> 00:59:59,620 Commissioner Villarreal. 845 00:59:59,620 --> 01:00:04,980 I move approval of the extension request to a date certain of June 28, 2023. 846 01:00:04,980 --> 01:00:05,980 Commissioner Cole. 847 01:00:05,980 --> 01:00:06,980 Second. 848 01:00:06,980 --> 01:00:13,820 We have a second for approval of the extension request to June 28, 2023. 849 01:00:13,820 --> 01:00:22,180 Seeing no discussion, let's vote on the board please. 850 01:00:22,180 --> 01:00:28,500 The motion carries 7-0, moving us to 4-B, PP 230012. 851 01:00:28,500 --> 01:00:33,540 Sean has remained at the podium for a presentation here. 852 01:00:33,540 --> 01:00:34,540 Thank you, Chair. 853 01:00:34,540 --> 01:00:40,340 I'm Sean Jacobson, here to present a proposed preliminary plat for the Sage Creek Town Homes 854 01:00:40,340 --> 01:00:42,180 edition. 855 01:00:42,180 --> 01:00:49,180 This is off Lattimore and Audre, approximately 23-acre site, and again, this plat has not 856 01:00:49,180 --> 01:00:53,900 yet met our criteria for approval, so staff is recommending denial, but has no objection 857 01:00:53,900 --> 01:00:57,580 to the request of 30-day extension to June 28. 858 01:00:57,580 --> 01:00:58,580 Happy to answer any questions. 859 01:00:58,580 --> 01:00:59,580 Thank you, Sean. 860 01:00:59,580 --> 01:01:06,820 I do not see any questions, thank you. 861 01:01:06,820 --> 01:01:09,340 Chair can entertain a discussion or a motion. 862 01:01:09,340 --> 01:01:10,340 Commissioner Smith. 863 01:01:10,340 --> 01:01:14,260 Make a motion to approve the extension of date certain to June 28, 2023. 864 01:01:14,260 --> 01:01:15,260 Commissioner Cole. 865 01:01:15,260 --> 01:01:16,260 Second. 866 01:01:16,260 --> 01:01:19,620 We've got a first and a second for approval of the extension request to a date certain 867 01:01:19,620 --> 01:01:23,780 of June 28, 2023. 868 01:01:23,780 --> 01:01:27,740 Seeing no discussion, let's vote on the board please. 869 01:01:27,740 --> 01:01:32,940 Motion carries 7-0. 870 01:01:32,940 --> 01:01:36,900 That will take us to 4C, PP230013. 871 01:01:36,900 --> 01:01:40,740 Julie Wyatt is here to present that item. 872 01:01:40,740 --> 01:01:44,660 Good evening, Julie Wyatt, principal planner. 873 01:01:44,660 --> 01:01:49,460 This is a preliminary plat for a single family residential subdivision located in the east 874 01:01:49,460 --> 01:01:52,260 part of town, south of McKinney. 875 01:01:52,260 --> 01:01:56,940 They do have a few items that they need to correct in order to meet the criteria for 876 01:01:56,940 --> 01:01:57,940 approval. 877 01:01:57,940 --> 01:02:03,860 So while staff is recommending denial of the request, we have no objection to the requested 878 01:02:03,860 --> 01:02:08,580 30-day extension and I'll be happy to answer any questions. 879 01:02:08,580 --> 01:02:09,580 Thanks, Julie. 880 01:02:09,580 --> 01:02:11,660 I do not see any questions for you. 881 01:02:11,660 --> 01:02:12,660 Thank you. 882 01:02:12,660 --> 01:02:15,660 Commissioner Villarreal. 883 01:02:15,660 --> 01:02:20,380 I move approval of the extension request to a date certain of June 28, 2023. 884 01:02:20,380 --> 01:02:21,380 Commissioner Cole. 885 01:02:21,380 --> 01:02:22,380 Second. 886 01:02:22,380 --> 01:02:25,300 Got a first and a second for approval of the extension request to a date certain of June 887 01:02:25,300 --> 01:02:27,740 28, 2023. 888 01:02:27,740 --> 01:02:37,400 Seeing no speakers, let's vote on the board please. 889 01:02:37,400 --> 01:02:39,060 That motion carries 7-0. 890 01:02:39,060 --> 01:02:43,980 That will take us to 4D, PE230003. 891 01:02:43,980 --> 01:02:44,980 Angie is here for that item. 892 01:02:44,980 --> 01:02:48,220 Good evening, Chair and members of the commission. 893 01:02:48,220 --> 01:02:49,700 Angie Megler, senior planner. 894 01:02:49,700 --> 01:02:59,460 Just a moment here. 895 01:02:59,460 --> 01:03:04,060 This is PE230003. 896 01:03:04,060 --> 01:03:06,980 It's a plat extension request for Habitat Village. 897 01:03:06,980 --> 01:03:08,260 Just a little bit of background on this. 898 01:03:08,260 --> 01:03:11,620 This is a plan development for Habitat for Humanity. 899 01:03:11,620 --> 01:03:13,900 It is called Habitat Village. 900 01:03:13,900 --> 01:03:20,020 The original preliminary plat was approved back in July of 2021 per our DDC. 901 01:03:20,020 --> 01:03:27,220 Plats do expire after two years if part or all of the final plat is not filed by that 902 01:03:27,220 --> 01:03:28,420 time. 903 01:03:28,420 --> 01:03:33,300 This plat is set to expire in July of 2023, so the applicant did submit a plat extension 904 01:03:33,300 --> 01:03:34,300 request. 905 01:03:34,300 --> 01:03:36,180 We do have some criteria for approval. 906 01:03:36,180 --> 01:03:41,900 The applicant did submit this request prior to the expiration of the preliminary plat. 907 01:03:41,900 --> 01:03:46,780 Plans for the requested extension or for the delay in the final plat were included in the 908 01:03:46,780 --> 01:03:47,780 applicant's narrative. 909 01:03:47,780 --> 01:03:51,940 However, they have been making progress towards the civil engineering plans for phase one, 910 01:03:51,940 --> 01:03:54,620 which consists of approximately 16 residential lots. 911 01:03:54,620 --> 01:03:59,100 It is anticipated that the civil engineering plans are approved within the next month or 912 01:03:59,100 --> 01:04:04,620 so and following that would be the final plat for phase one of the development. 913 01:04:04,620 --> 01:04:10,620 In order to avoid possible lapse of the approval of that original preliminary plat, they are 914 01:04:10,620 --> 01:04:15,980 seeking an extension, which the Commission has the authority to grant for up to one year. 915 01:04:15,980 --> 01:04:19,140 With that, I'm happy to answer any questions you may have. 916 01:04:19,140 --> 01:04:20,140 Thank you, Angie. 917 01:04:20,140 --> 01:04:23,980 Any questions for Angie? 918 01:04:23,980 --> 01:04:26,180 Thank you very much. 919 01:04:26,180 --> 01:04:27,180 Commissioner Smith. 920 01:04:27,180 --> 01:04:29,380 Make a motion to approve. 921 01:04:29,380 --> 01:04:30,380 Commissioner Cole. 922 01:04:30,380 --> 01:04:31,380 Second. 923 01:04:31,380 --> 01:04:32,380 Okay. 924 01:04:32,380 --> 01:04:36,220 We've got a first and a second for approval of this plat extension. 925 01:04:36,220 --> 01:04:37,220 Any discussion? 926 01:04:37,220 --> 01:04:38,220 Okay. 927 01:04:38,220 --> 01:04:48,580 Seeing none, let's vote on the board, please. 928 01:04:48,580 --> 01:04:51,380 That motion carries 7-0. 929 01:04:51,380 --> 01:04:57,380 As I mentioned at the start of our meeting, our public hearing item 5ADCA230001 is being 930 01:04:57,380 --> 01:04:59,300 postponed and will be re-noticed. 931 01:04:59,300 --> 01:05:07,820 We will not be taking action on that item today, and 5BZ220022 as well will be re-noticed 932 01:05:07,820 --> 01:05:08,820 on a future date. 933 01:05:08,820 --> 01:05:11,540 We will not be taking action on that item this evening. 934 01:05:11,540 --> 01:05:21,180 So that will move us to our planning and zoning matrix, and I will let Tina have the floor. 935 01:05:21,180 --> 01:05:23,340 Thank you, Chair Ellis. 936 01:05:23,340 --> 01:05:25,220 Looks like I have the longer report this evening. 937 01:05:25,220 --> 01:05:30,860 No, actually, just real quick, a few items, projects you're aware of that we're working 938 01:05:30,860 --> 01:05:31,860 on. 939 01:05:31,860 --> 01:05:36,880 So the downtown area plan project, as Ron mentioned earlier this evening in his presentation, 940 01:05:36,880 --> 01:05:42,580 we do have the contract slated to go to council at the end of this month on June 27th. 941 01:05:42,580 --> 01:05:47,060 And so once we get that contract approved by city council, then we will take the next 942 01:05:47,060 --> 01:05:51,980 steps and start working with our consultant to our kickoff meeting and roll out into some 943 01:05:51,980 --> 01:05:55,620 extensive public engagement with that particular project. 944 01:05:55,620 --> 01:05:59,500 Southeast Denton, recent activities related to that project, or we've added a few more 945 01:05:59,500 --> 01:06:04,380 members to the steering committee, and so council took action at their previous meeting 946 01:06:04,380 --> 01:06:06,180 as it relates to that. 947 01:06:06,180 --> 01:06:12,140 We do have another round of listening sessions that we are hosting next week on June 21st 948 01:06:12,140 --> 01:06:18,580 from 6 to 8, as well as June 22nd from 6 to 8 p.m. at the Martin Luther King Junior Recreation 949 01:06:18,580 --> 01:06:19,900 Center here in Denton. 950 01:06:19,900 --> 01:06:24,340 And so with folks missed out on getting to meet with our consultant team back in April, 951 01:06:24,340 --> 01:06:27,300 then they have another opportunity to meet with them next week. 952 01:06:27,300 --> 01:06:34,020 And so we've done some additional extensive public engagement and outreach to obtain that 953 01:06:34,020 --> 01:06:36,540 event, we'll have folks come and participate. 954 01:06:36,540 --> 01:06:41,260 We also have, with the Juneteenth festivities that are happening this weekend, so we're 955 01:06:41,260 --> 01:06:42,540 going to have a presence. 956 01:06:42,540 --> 01:06:46,980 Our team will, I know Julie and Mia have been working hard preparing for this event, along 957 01:06:46,980 --> 01:06:50,940 with our consultant team, we will have a booth there at the Juneteenth event. 958 01:06:50,940 --> 01:06:56,080 So we'll have staff present on Friday evening and on Saturday. 959 01:06:56,080 --> 01:07:00,460 If folks have questions, want to talk with us so we can promote the project and hopefully 960 01:07:00,460 --> 01:07:03,660 gain some additional feedback from the community that way. 961 01:07:03,660 --> 01:07:09,940 I know the team is also meeting with representatives from LULAC on Saturday as well, because they 962 01:07:09,940 --> 01:07:12,540 obviously have an interest within the project area. 963 01:07:12,540 --> 01:07:18,220 The team will also be doing some intercept surveys next week, being out in the community 964 01:07:18,220 --> 01:07:22,300 as well, again, trying to receive feedback from folks as it relates to the future of 965 01:07:22,300 --> 01:07:24,060 Southeast Denton. 966 01:07:24,060 --> 01:07:29,700 And then we will have our first steering committee meeting also next Friday, and I know the team's 967 01:07:29,700 --> 01:07:35,860 going to be at the Sedna meeting on June 26th, so again, really pushing that public engagement, 968 01:07:35,860 --> 01:07:39,900 really trying to have folks come and talk with us, learn more about the project, and 969 01:07:39,900 --> 01:07:45,060 truly be involved in this plan that we're working on, because it is truly a community-driven 970 01:07:45,060 --> 01:07:47,400 plan from that perspective. 971 01:07:47,400 --> 01:07:50,140 Northeast, really no updates as it relates to that. 972 01:07:50,140 --> 01:07:54,340 We're working on more of the analysis, starting to develop strategies. 973 01:07:54,340 --> 01:07:58,700 The steering committee did meet here recently, and my apologies, I forgot to write the date 974 01:07:58,700 --> 01:08:03,120 down, but we have been working with them in that regard. 975 01:08:03,120 --> 01:08:07,700 And then lastly, I know the DCRC, some of you serve on the DCRC, and then the rest of 976 01:08:07,700 --> 01:08:10,740 you are interested in what they're working on in their calendar. 977 01:08:10,740 --> 01:08:14,660 They're actually going to take a short hiatus this summer, a couple of reasons why. 978 01:08:14,660 --> 01:08:20,620 One allows folks to be able to take vacations and get trips planned, or be able to address 979 01:08:20,620 --> 01:08:22,860 their trips that they may have planned. 980 01:08:22,860 --> 01:08:26,740 Also gives us a little more time to be able to prepare some materials as we bring back, 981 01:08:26,740 --> 01:08:30,340 as parking is going to be one of those items that we hit the ground running with. 982 01:08:30,340 --> 01:08:36,980 And then also, we have, hopefully we'll get an additional council appointee to the committee 983 01:08:36,980 --> 01:08:40,420 as well, that ideally will happen this summer. 984 01:08:40,420 --> 01:08:44,580 So want to be able to start with a full slate, if at all possible. 985 01:08:44,580 --> 01:08:47,060 We look to resume on August 14th. 986 01:08:47,060 --> 01:08:50,580 So for those of you that are on that committee, I know there was some discussion about possibly 987 01:08:50,580 --> 01:08:57,320 getting together in late July, but our topic that we were anticipating, they have a conflict 988 01:08:57,320 --> 01:08:58,320 with DME. 989 01:08:58,320 --> 01:09:01,100 And so we'll just start again in mid-August on that. 990 01:09:01,100 --> 01:09:08,500 So but nonetheless, so they remain busy, and I should mention we did provide an update 991 01:09:08,500 --> 01:09:12,900 on our public engagement plan as it relates to short-term rentals. 992 01:09:12,900 --> 01:09:18,180 And so we'll be working on that because the DCRC wanted to make sure that we get out into 993 01:09:18,180 --> 01:09:22,740 the community, receive feedback from the community, because they wanted to get that feedback first 994 01:09:22,740 --> 01:09:26,540 before being able to make any additional decisions as it relates on code amendments. 995 01:09:26,540 --> 01:09:29,180 So we have that going on as well. 996 01:09:29,180 --> 01:09:31,540 So that concludes my report. 997 01:09:31,540 --> 01:09:38,140 Other than we will note the comprehensive plan annual update item as, or having that 998 01:09:38,140 --> 01:09:42,060 noted that we provided an update this evening for the commission's benefit. 999 01:09:42,060 --> 01:09:46,540 And also, we are going to provide similar information to city council so that they're 1000 01:09:46,540 --> 01:09:50,500 aware of all the work that has been accomplished by the city organization as a whole as it 1001 01:09:50,500 --> 01:09:52,960 relates to our comprehensive plan implementation. 1002 01:09:52,960 --> 01:09:53,980 That concludes my report. 1003 01:09:53,980 --> 01:09:54,980 Thank you. 1004 01:09:54,980 --> 01:09:55,980 Thank you, Tina. 1005 01:09:55,980 --> 01:09:57,380 Anything for the matrix? 1006 01:09:57,380 --> 01:09:58,380 Commissioner Villarreal. 1007 01:09:58,380 --> 01:10:02,460 Just a quick question in regards to the Southeast Denton area plan preparation. 1008 01:10:02,460 --> 01:10:07,020 I understand that attendance may have been lower than expected. 1009 01:10:07,020 --> 01:10:11,180 Was that staff's expectations in terms of the amount of folks that ended up coming out 1010 01:10:11,180 --> 01:10:12,980 to the listening sessions? 1011 01:10:12,980 --> 01:10:14,100 Yes. 1012 01:10:14,100 --> 01:10:18,400 So it does not surprise us that our numbers were lower compared to, I know it gets compared 1013 01:10:18,400 --> 01:10:22,140 a lot with the Northeast Denton plan because of the numbers that we've had at the, some 1014 01:10:22,140 --> 01:10:23,860 of the public engagement. 1015 01:10:23,860 --> 01:10:29,100 But when we're working with a community that has experienced past harm by an organization 1016 01:10:29,100 --> 01:10:35,260 who feels that they're not heard from the city as an organization, then it does not 1017 01:10:35,260 --> 01:10:37,980 surprise me that folks are not wanting to be engaged. 1018 01:10:37,980 --> 01:10:44,680 And so hence why I can't tell you how much my team has really been trying to work on 1019 01:10:44,680 --> 01:10:49,060 maximizing relationships and, you know, they talk to one individual, you know, do you know 1020 01:10:49,060 --> 01:10:52,940 of anybody else that would be interested in this project and they reach out to them and 1021 01:10:52,940 --> 01:10:55,220 do you know anybody else that'll be reached out in this project. 1022 01:10:55,220 --> 01:11:00,220 So hence why they've been working really hard and really having a presence and getting information 1023 01:11:00,220 --> 01:11:03,180 out especially this next round of listening sessions. 1024 01:11:03,180 --> 01:11:07,900 We had our invitations translated into Spanish because we know that we have residents that 1025 01:11:07,900 --> 01:11:11,060 are Spanish speaking that are in this area of the community. 1026 01:11:11,060 --> 01:11:18,100 And so we were concerned that maybe that's why that particular demographic did not participate 1027 01:11:18,100 --> 01:11:19,980 in our listening sessions previously. 1028 01:11:19,980 --> 01:11:23,940 We intend to have a translator on site as well to be able to help so that hopefully 1029 01:11:23,940 --> 01:11:27,860 language is not a barrier of communication as it relates to this project. 1030 01:11:27,860 --> 01:11:32,940 But it doesn't surprise me that we've had low numbers on these kind of projects. 1031 01:11:32,940 --> 01:11:34,700 It's kind of hit or miss. 1032 01:11:34,700 --> 01:11:37,780 Mostly northeast, very engaged community, right. 1033 01:11:37,780 --> 01:11:45,580 And so they've got a strong network that they utilize in being able to communicate to folks 1034 01:11:45,580 --> 01:11:47,660 that have an interest in that project area. 1035 01:11:47,660 --> 01:11:53,780 So it's I would say don't compare the two areas and hold one against the other because 1036 01:11:53,780 --> 01:11:56,620 they're completely different situations that we're dealing with. 1037 01:11:56,620 --> 01:11:57,620 Right. 1038 01:11:57,620 --> 01:12:02,580 And my next question and your part probably answered it fully was did we change anything 1039 01:12:02,580 --> 01:12:06,900 between the first round of listening sessions in terms of reaching out to the community 1040 01:12:06,900 --> 01:12:08,420 to the summer listening sessions. 1041 01:12:08,420 --> 01:12:12,700 It sounds like we are doing a better job of reaching out to the Hispanic community in 1042 01:12:12,700 --> 01:12:16,940 southeastern which it's about half the population there. 1043 01:12:16,940 --> 01:12:17,940 Absolutely. 1044 01:12:17,940 --> 01:12:25,700 So we're trying to leverage all forms of communication that we can to get folks to participate. 1045 01:12:25,700 --> 01:12:32,380 Also trying to get a certain age of demographic as well as it relates to that project. 1046 01:12:32,380 --> 01:12:37,380 And so yes, we we've been working with our consultant to see what could we do to retool 1047 01:12:37,380 --> 01:12:39,900 as it relates to those public engagement sessions. 1048 01:12:39,900 --> 01:12:40,900 Fantastic. 1049 01:12:40,900 --> 01:12:41,900 Thank you. 1050 01:12:41,900 --> 01:12:42,900 You're welcome. 1051 01:12:42,900 --> 01:12:43,900 Commissioner Cole. 1052 01:12:43,900 --> 01:12:44,900 Yeah. 1053 01:12:44,900 --> 01:12:53,060 On the same frequency are the two smaller plans the same size as committee as far as people 1054 01:12:53,060 --> 01:12:55,580 or. 1055 01:12:55,580 --> 01:12:56,580 Right now? 1056 01:12:56,580 --> 01:12:57,580 No. 1057 01:12:57,580 --> 01:13:04,780 And so the again we just Julie how many total are we up to for southeast on the steering 1058 01:13:04,780 --> 01:13:05,780 committee. 1059 01:13:05,780 --> 01:13:09,620 Are we at eight now. 1060 01:13:09,620 --> 01:13:12,300 We have nine on the steering committee. 1061 01:13:12,300 --> 01:13:14,300 We could go up to a maximum of 15. 1062 01:13:14,300 --> 01:13:18,100 So we wanted to keep it around the 10 to 15. 1063 01:13:18,100 --> 01:13:20,340 We think that's probably the best. 1064 01:13:20,340 --> 01:13:25,460 Seems the lower end probably would be more beneficial to get a quorum you know if you're 1065 01:13:25,460 --> 01:13:27,780 if you're comparing right. 1066 01:13:27,780 --> 01:13:35,540 So it's we again trying to maximize those relationships we just received additional 1067 01:13:35,540 --> 01:13:40,500 names that we got added to the steering committee here at the last council meeting. 1068 01:13:40,500 --> 01:13:45,100 And so as as we continue to work on these projects if more people get interested there 1069 01:13:45,100 --> 01:13:47,420 may be some that will be willing to serve. 1070 01:13:47,420 --> 01:13:51,900 I think there's a misnomer out there that we're meeting every single week or that they 1071 01:13:51,900 --> 01:13:55,700 would have to meet every single week and that and that's not the case. 1072 01:13:55,700 --> 01:14:00,780 I know that comment was made by an individual and so we want to try to make sure that that 1073 01:14:00,780 --> 01:14:05,020 message was out there is that you're only meeting four times as it relates to the project. 1074 01:14:05,020 --> 01:14:09,580 You know it could be that that number expands but really we've got a schedule put in place 1075 01:14:09,580 --> 01:14:16,260 where they would meet potentially four times and we do a really good job of trying to use 1076 01:14:16,260 --> 01:14:20,580 their time wisely and obtain their feedback when we need it on the project. 1077 01:14:20,580 --> 01:14:22,940 So even with both groups right. 1078 01:14:22,940 --> 01:14:27,060 So the Northeast Denton plan obviously it's a little bit larger steering committee. 1079 01:14:27,060 --> 01:14:32,060 We just had many more people that are willing and interested in participating and you know 1080 01:14:32,060 --> 01:14:34,940 met several of the categories that we were interested in having feedback on. 1081 01:14:34,940 --> 01:14:39,620 So hopefully we'll have hopefully have a similar challenge with downtown where we have more 1082 01:14:39,620 --> 01:14:43,700 people wanting to serve on the steering committee than then ideally we have positions for that. 1083 01:14:43,700 --> 01:14:44,700 So Commissioner McDade. 1084 01:14:44,700 --> 01:14:45,700 Thank you. 1085 01:14:45,700 --> 01:14:52,620 Tina I am I need you to go back you said the steering the South East End steering committee 1086 01:14:52,620 --> 01:15:00,340 was going to go into me when we have them scheduled for next Friday June 23rd. 1087 01:15:00,340 --> 01:15:08,340 What time one thirty one thirty is when they're meeting at the Martin Luther King Center or 1088 01:15:08,340 --> 01:15:15,020 where I have a question is that is that going to be like a closed session or technically 1089 01:15:15,020 --> 01:15:16,940 it is an open meeting. 1090 01:15:16,940 --> 01:15:21,180 All of the conversations and discussion would be limited to the steering committee. 1091 01:15:21,180 --> 01:15:25,780 If we had time remaining then there could be an opportunity to receive any comments 1092 01:15:25,780 --> 01:15:26,780 at that time. 1093 01:15:26,780 --> 01:15:30,780 I know we had that happen with the Northeast steering committee here recently. 1094 01:15:30,780 --> 01:15:34,960 So in their case we use the full allotted time and then some. 1095 01:15:34,960 --> 01:15:36,900 So but it is an open meeting. 1096 01:15:36,900 --> 01:15:40,100 People are welcome to attend but the discussion will be limited to the steering committee 1097 01:15:40,100 --> 01:15:41,400 and where is the meeting. 1098 01:15:41,400 --> 01:15:45,200 It will be at the Development Services Center at 401 North Elm. 1099 01:15:45,200 --> 01:15:46,200 Okay. 1100 01:15:46,200 --> 01:15:47,200 All right. 1101 01:15:47,200 --> 01:15:48,200 Thank you. 1102 01:15:48,200 --> 01:15:49,200 You bet. 1103 01:15:49,200 --> 01:15:50,200 Okay. 1104 01:15:50,200 --> 01:15:51,200 Great. 1105 01:15:51,200 --> 01:15:52,200 Other things for the matrix. 1106 01:15:52,200 --> 01:15:53,200 Yeah. 1107 01:15:53,200 --> 01:15:56,460 And thank you to staff for I mean working so hard on both these area plans and it definitely 1108 01:15:56,460 --> 01:16:00,220 shouldn't be compared and attended and none of that should be compared. 1109 01:16:00,220 --> 01:16:02,460 That's just because they happen to be running at the same time. 1110 01:16:02,460 --> 01:16:06,900 They're two vastly different areas with vastly different problems. 1111 01:16:06,900 --> 01:16:14,260 So the issue is it's so great that we have both of these in place and momentum will get 1112 01:16:14,260 --> 01:16:20,300 going and as you all stay on it and people will get involved and we'll have positive 1113 01:16:20,300 --> 01:16:24,100 things come out of both of them I am certain. 1114 01:16:24,100 --> 01:16:28,860 Tina one thing to add to the matrix if you could and you know this is just coming out 1115 01:16:28,860 --> 01:16:33,700 of the work session discussion today but could we get some kind somebody here from Rhodes 1116 01:16:33,700 --> 01:16:36,940 to talk about our text dot Rhodes. 1117 01:16:36,940 --> 01:16:37,940 What is happening. 1118 01:16:37,940 --> 01:16:45,020 You said a few words today that you know were interesting about maybe take back or what. 1119 01:16:45,020 --> 01:16:50,500 I mean I would love a synopsis in a work session report by someone I think that would do all 1120 01:16:50,500 --> 01:16:55,460 of us good to to yeah to get a yes. 1121 01:16:55,460 --> 01:16:56,460 Absolutely. 1122 01:16:56,460 --> 01:17:00,960 So just what's happening just so a discussion regarding all of our text out roadways or 1123 01:17:00,960 --> 01:17:04,900 just particularly Almond Locus. 1124 01:17:04,900 --> 01:17:12,860 Well I suppose Almond Locus would probably be a great discussion wouldn't it. 1125 01:17:12,860 --> 01:17:14,100 I guess let's start there. 1126 01:17:14,100 --> 01:17:15,780 Why don't we do that. 1127 01:17:15,780 --> 01:17:22,020 That way we can get a lot of information and make it not be quite so broad. 1128 01:17:22,020 --> 01:17:27,980 So we get some specific questions answered that commissioners brought up and I know that 1129 01:17:27,980 --> 01:17:32,020 all of us are getting questions on from citizens. 1130 01:17:32,020 --> 01:17:33,020 OK. 1131 01:17:33,020 --> 01:17:34,020 Yes. 1132 01:17:34,020 --> 01:17:35,020 We can add that. 1133 01:17:35,020 --> 01:17:39,180 And to that point I mean if you are interested in other text out roadways that we have here 1134 01:17:39,180 --> 01:17:45,700 in the city the mobility committee receives I believe it's a monthly report or quarterly 1135 01:17:45,700 --> 01:17:53,180 report but if you go to like city of Denton public meetings it takes you to our public 1136 01:17:53,180 --> 01:17:57,580 meeting page that has all of the various boards of commissions and committees that meet click 1137 01:17:57,580 --> 01:18:01,100 on mobility committee and then you can look at their meeting dates. 1138 01:18:01,100 --> 01:18:04,820 One of the things like I said they get a it's either a monthly or quarterly report from 1139 01:18:04,820 --> 01:18:10,340 a consultant that we work with I.T.S. they provide a report as it relates to all of the 1140 01:18:10,340 --> 01:18:17,540 text our roadways projects that are happening within our city and it includes timelines 1141 01:18:17,540 --> 01:18:21,220 associated with the project the latest status as it relates to that and if members serves 1142 01:18:21,220 --> 01:18:25,060 me correctly they even highlight in yellow what's changed since the previous meeting 1143 01:18:25,060 --> 01:18:30,740 but it's a great summary it's a tool that I have a tendency to utilize to see where 1144 01:18:30,740 --> 01:18:35,860 we are on on certain projects but just given our sheer number of text out roadways that 1145 01:18:35,860 --> 01:18:37,340 we have within our community. 1146 01:18:37,340 --> 01:18:41,020 But but as it relates to that matrix request we can definitely get a presentation regarding 1147 01:18:41,020 --> 01:18:45,660 element locus appreciate it Commissioner Pruitt yeah I just wanted to second the request from 1148 01:18:45,660 --> 01:18:48,420 chair Ellis I think that'll be very helpful. 1149 01:18:48,420 --> 01:18:53,540 What I would like to hear is specifically element locusts with take back concerning 1150 01:18:53,540 --> 01:18:57,540 how that integrates with the downtown plan as well. 1151 01:18:57,540 --> 01:19:02,460 And then maybe just a brief update of how the scheduling is looking for the remaining 1152 01:19:02,460 --> 01:19:07,720 phases of Bonnie Brae versus the thirty five why project there's just a lot of stuff going 1153 01:19:07,720 --> 01:19:13,780 on over there there's a lot of things breaking ground for industrial stuff west of their 1154 01:19:13,780 --> 01:19:18,420 just kind of how how that mess is going to play out over the next five years would be 1155 01:19:18,420 --> 01:19:19,420 helpful. 1156 01:19:19,420 --> 01:19:25,380 Okay so I heard Bonnie Brae project and I'm sorry what in relationship to thirty five. 1157 01:19:25,380 --> 01:19:32,020 So the messaging I've heard from staff before was that one of the main goals with the Bonnie 1158 01:19:32,020 --> 01:19:37,220 Brae project and getting it funded earlier with the twenty nineteen bond and previously 1159 01:19:37,220 --> 01:19:43,100 was to get that project completed before text comes through and rips up thirty five with 1160 01:19:43,100 --> 01:19:49,920 the interchange between E and W to be able to handle some of the overflow traffic. 1161 01:19:49,920 --> 01:19:54,780 So just it doesn't have to be a long update I would say let's focus on on element locusts 1162 01:19:54,780 --> 01:20:02,140 but if there's information that would be pertinent to our you know decisions in that area with 1163 01:20:02,140 --> 01:20:07,060 what's happening there it may help answer some questions on the front end if that makes 1164 01:20:07,060 --> 01:20:08,060 sense. 1165 01:20:08,060 --> 01:20:19,900 Okay thank you okay any concluding items okay well with that I wish everybody a happy flag 1166 01:20:19,900 --> 01:20:24,940 day enjoy the rest of your evening and I will adjourn us at seven thirteen p.m. Thank you.