 >> Good afternoon and welcome to the city planning and zoning commission meeting for

00:00:07.440 --> 00:00:10.800
 Wednesday March 1, 2023.

00:00:10.800 --> 00:00:16.120
 This is our work session and with the quorum present I will call us to order at 5.01 p.m.

00:00:16.120 --> 00:00:20.440
 I'll let the record show Commissioner Anderson is absent at this time.

00:00:20.440 --> 00:00:25.680
 First item on the agenda for our work session is the clarification of our agenda for tonight's

00:00:25.680 --> 00:00:26.680
 meeting.

00:00:26.680 --> 00:00:28.000
 So let's move right into that.

00:00:28.000 --> 00:00:32.700
 We've got the minutes from February 15th.

00:00:32.700 --> 00:00:35.680
 Any questions or concerns on that?

00:00:35.680 --> 00:00:36.680
 Okay.

00:00:36.680 --> 00:00:40.280
 Then we'll go to individual consideration items.

00:00:40.280 --> 00:00:47.240
 I will invite Ron up to give us a quick little summary of 3A.

00:00:47.240 --> 00:00:53.480
 >> Yes, ma'am.

00:00:53.480 --> 00:01:00.880
 So this is a rezoning or initial rezoning to LI request from an applicant.

00:01:00.880 --> 00:01:08.400
 This was heard at your February 15th, 2023 meeting as you all recall, P and Z open and

00:01:08.400 --> 00:01:14.240
 close the public hearing and as a result of that there was a motion to deny.

00:01:14.240 --> 00:01:21.480
 The deny turned out to be a tie vote per our section of the code that speaks to a tie vote

00:01:21.480 --> 00:01:22.480
 at P and Z.

00:01:22.480 --> 00:01:28.940
 It is placed on the next planning zoning commission meeting where the P and Z would consider it

00:01:28.940 --> 00:01:33.400
 again as an individual consideration which is what's on the agenda.

00:01:33.400 --> 00:01:39.000
 If there happens to be a second tie vote just for if that happens, it would be a recommendation

00:01:39.000 --> 00:01:43.720
 of a denial to city council but the majority vote would not be required by city council

00:01:43.720 --> 00:01:44.800
 to approve it.

00:01:44.800 --> 00:01:49.840
 Just sort of lay out what would be next if that was the case.

00:01:49.840 --> 00:01:54.720
 For kind of reminder, this is again an initial zoning to LI for this property that's outlined

00:01:54.720 --> 00:01:58.720
 here in yellow on the corner of Thomas Egan and US 380.

00:01:58.720 --> 00:02:04.160
 It was annexed on January 10th of this year following the rezoning of the southern track

00:02:04.160 --> 00:02:08.040
 which is just directly to the south to LI.

00:02:08.040 --> 00:02:12.840
 The subject property that's being considered is 18.6 acres.

00:02:12.840 --> 00:02:18.600
 Currently agriculture, again, Thomas Egan and university is the major arterials.

00:02:18.600 --> 00:02:20.920
 The proposed use is light industrial.

00:02:20.920 --> 00:02:22.920
 So that's a quick summary.

00:02:22.920 --> 00:02:26.720
 We can go into more information at the public hearing but just if there are any questions

00:02:26.720 --> 00:02:27.720
 so far.

00:02:27.720 --> 00:02:28.720
 >> Any questions for Ron?

00:02:28.720 --> 00:02:34.920
 And Ron, you're going to give a full presentation obviously from what we had last meeting, right?

00:02:34.920 --> 00:02:35.920
 >> Yes.

00:02:35.920 --> 00:02:36.920
 >> Okay.

00:02:36.920 --> 00:02:37.920
 Sounds good.

00:02:37.920 --> 00:02:38.920
 If there's no questions, we'll go ahead and move on.

00:02:38.920 --> 00:02:39.920
 Okay.

00:02:39.920 --> 00:02:40.920
 Thanks, Ron.

00:02:40.920 --> 00:02:41.920
 >> Okay.

00:02:41.920 --> 00:02:42.920
 >> Let's go ahead to 3B.

00:02:42.920 --> 00:02:49.840
 And Cameron will give us a quick summary of that.

00:02:49.840 --> 00:02:50.840
 Hi, Cameron.

00:02:50.840 --> 00:02:51.840
 >> Hi.

00:02:51.840 --> 00:02:52.840
 It's been a while.

00:02:52.840 --> 00:02:53.840
 >> Yeah.

00:02:53.840 --> 00:02:54.840
 It has.

00:02:54.840 --> 00:02:55.840
 >> Okay.

00:02:55.840 --> 00:02:59.960
 So this is for preliminary plot for Denton Logistics Center.

00:02:59.960 --> 00:03:06.280
 It is located on FM 1173 just west of the railroad tracks.

00:03:06.280 --> 00:03:10.440
 Staff is recommending denial of the plot as it does not meet criteria for approval but

00:03:10.440 --> 00:03:14.840
 staff has no objection to the extension to March 29th.

00:03:14.840 --> 00:03:15.840
 Any questions?

00:03:15.840 --> 00:03:16.840
 >> Great.

00:03:16.840 --> 00:03:17.840
 Questions?

00:03:17.840 --> 00:03:18.840
 Okay.

00:03:18.840 --> 00:03:19.840
 Thanks, Cameron.

00:03:19.840 --> 00:03:22.960
 That will move us to 3C.

00:03:22.960 --> 00:03:27.240
 And Sean will present that.

00:03:27.240 --> 00:03:28.240
 >> Good.

00:03:28.240 --> 00:03:30.240
 >> Hi, Sean.

00:03:30.240 --> 00:03:31.600
 >> Howdy.

00:03:31.600 --> 00:03:35.560
 This is a plot FR23-0002.

00:03:35.560 --> 00:03:40.720
 It's a proposed final replat of the mid-state's realty addition.

00:03:40.720 --> 00:03:45.480
 So this is a five point, essentially a five acre site off loop 288.

00:03:45.480 --> 00:03:49.080
 That's where the tractor supply is, if you're familiar.

00:03:49.080 --> 00:03:53.160
 Currently they have not met our criteria for approval, recommended denial, but no objection

00:03:53.160 --> 00:03:54.880
 to the request for an extension.

00:03:54.880 --> 00:03:56.800
 Can I answer any questions?

00:03:56.800 --> 00:03:57.800
 >> Awesome.

00:03:57.800 --> 00:04:00.320
 Any questions for Sean on this one?

00:04:00.320 --> 00:04:01.320
 Okay.

00:04:01.320 --> 00:04:02.320
 Thank you very much.

00:04:02.320 --> 00:04:06.400
 That will take us to 3D.

00:04:06.400 --> 00:04:09.160
 And Mia, if you just want to say a couple of words, that would be great.

00:04:09.160 --> 00:04:19.640
 Thank you.

00:04:19.640 --> 00:04:26.920
 >> So this item is the, consider the reconsideration of the PD that was on the agenda for February

00:04:26.920 --> 00:04:28.620
 15th.

00:04:28.620 --> 00:04:33.280
 Just to give you an idea of whether or not, or however you decide to vote this evening,

00:04:33.280 --> 00:04:38.480
 if you decide to reconsider, or vote to reconsider this item, we would re-notice it for another

00:04:38.480 --> 00:04:42.640
 public hearing on March 29th before this body.

00:04:42.640 --> 00:04:46.480
 And then that would subsequently go to city council in April, most likely the first meeting

00:04:46.480 --> 00:04:47.720
 in April.

00:04:47.720 --> 00:04:54.440
 And then if you choose to, if you choose not to reconsider this item, then the original

00:04:54.440 --> 00:04:59.080
 recommendation of denial will be forwarded to the city council, excuse me, for the March

00:04:59.080 --> 00:05:02.480
 7th, which is next Tuesday's city council meeting.

00:05:02.480 --> 00:05:03.480
 Any questions?

00:05:03.480 --> 00:05:04.480
 >> Okay, great.

00:05:04.480 --> 00:05:07.040
 And I assume you're going to be presenting that exact thing at the meeting tonight?

00:05:07.040 --> 00:05:08.040
 >> Yes, ma'am.

00:05:08.040 --> 00:05:10.040
 And then ultimately, it's up to you all to discuss.

00:05:10.040 --> 00:05:11.040
 >> That's perfect.

00:05:11.040 --> 00:05:18.120
 And before, I'm going to read a statement just for clarity on what is happening prior

00:05:18.120 --> 00:05:22.760
 to calling you up for that, in case we have people who come tonight, because we're not

00:05:22.760 --> 00:05:25.960
 really hearing the item tonight, so there might be some confusion.

00:05:25.960 --> 00:05:27.900
 So I just want to set that straight.

00:05:27.900 --> 00:05:32.360
 So if there is somebody, while listening or here, I'm sure you've all seen, we've gotten

00:05:32.360 --> 00:05:33.560
 a lot of comments on that.

00:05:33.560 --> 00:05:38.000
 So it's leading to thinking that maybe they're thinking we're going to actually hear the

00:05:38.000 --> 00:05:40.080
 item tonight, which we're not.

00:05:40.080 --> 00:05:43.320
 We are just considering the reconsideration tonight.

00:05:43.320 --> 00:05:44.520
 Okay?

00:05:44.520 --> 00:05:45.520
 Any questions?

00:05:45.520 --> 00:05:46.520
 All right.

00:05:46.520 --> 00:05:47.520
 Okay.

00:05:47.520 --> 00:05:48.520
 Thanks, Mia.

00:05:48.520 --> 00:05:50.160
 But you are up for our public hearing tonight.

00:05:50.160 --> 00:05:56.320
 So we can be right there, and we'll get a summary of 4A.

00:05:56.320 --> 00:06:08.240
 >> Okay, 4A is an item, Z23-0001 is an item to rezone just under 30 acres from a Plan

00:06:08.240 --> 00:06:11.800
 Development 120 to the mixed-use neighborhood district.

00:06:11.800 --> 00:06:16.760
 I'll go into a little detail about the background of that PD more in the work session.

00:06:16.760 --> 00:06:24.580
 So for the site, it's located just south of Loop 288, a little west of West Locust.

00:06:24.580 --> 00:06:35.680
 The property's future land use designation is of moderate residential, and the request

00:06:35.680 --> 00:06:40.040
 would establish enforceable development standards for the subject property, and of course bring

00:06:40.040 --> 00:06:45.520
 them up to the current development code as opposed to the outdated PD, which was originally

00:06:45.520 --> 00:06:48.040
 established back in 1986.

00:06:48.040 --> 00:06:51.880
 So staff is recommending approval, and I will take any other questions or any questions

00:06:51.880 --> 00:06:53.000
 that you have at this time.

00:06:53.000 --> 00:06:54.000
 >> Okay.

00:06:54.000 --> 00:06:55.000
 Thank you.

00:06:55.000 --> 00:06:56.840
 Any questions for me on this item?

00:06:56.840 --> 00:07:02.120
 I mean, I was reading -- great backup, by the way, and you kept saying, like, illegible.

00:07:02.120 --> 00:07:05.640
 So are -- is there just parts of it that are just -- you cannot read?

00:07:05.640 --> 00:07:10.840
 >> Yeah, because the older -- you remember print and copy back in the '80s.

00:07:10.840 --> 00:07:13.160
 So those documents -- >> It's just kind of faded away, didn't it?

00:07:13.160 --> 00:07:14.160
 Okay.

00:07:14.160 --> 00:07:15.160
 You're not really sure what it says at this point.

00:07:15.160 --> 00:07:16.160
 >> I don't know it.

00:07:16.160 --> 00:07:17.160
 Okay.

00:07:17.160 --> 00:07:18.160
 Okay.

00:07:18.160 --> 00:07:19.160
 Good deal.

00:07:19.160 --> 00:07:20.160
 Okay.

00:07:20.160 --> 00:07:21.800
 I do not see any questions.

00:07:21.800 --> 00:07:22.800
 Thank you.

00:07:22.800 --> 00:07:23.800
 Look forward to the presentation.

00:07:23.800 --> 00:07:24.800
 Okay.

00:07:24.800 --> 00:07:29.360
 So that is our agenda discussion then for the work session.

00:07:29.360 --> 00:07:34.160
 So we'll go ahead and move into our work session report 2A, which is Receive a Report, Hold

00:07:34.160 --> 00:07:40.880
 a Discussion Regarding Protection and Preservation of Environmentally Sensitive Areas.

00:07:40.880 --> 00:07:43.520
 Christy is going to present for us.

00:07:43.520 --> 00:07:44.520
 Hello.

00:07:44.520 --> 00:07:45.520
 >> Hi.

00:07:45.520 --> 00:07:46.520
 It's been a while for me too.

00:07:46.520 --> 00:07:47.520
 >> It has.

00:07:47.520 --> 00:07:48.520
 >> No?

00:07:48.520 --> 00:07:49.520
 It's the wrong one.

00:07:49.520 --> 00:07:50.520
 Oh.

00:07:50.520 --> 00:07:51.520
 I found it.

00:07:51.520 --> 00:07:52.520
 Okay.

00:07:52.520 --> 00:07:53.520
 Okay.

00:07:53.520 --> 00:08:06.800
 So tonight I'm going to be providing you a summary of the Environmentally Sensitive Areas

00:08:06.800 --> 00:08:13.400
 Program anticipation of a couple of projects that we will be bringing to you in the next

00:08:13.400 --> 00:08:14.900
 couple of months.

00:08:14.900 --> 00:08:21.360
 So I just wanted to go over the outline of the program and how that works within the

00:08:21.360 --> 00:08:27.680
 City of Denton overall development framework.

00:08:27.680 --> 00:08:35.440
 So the purpose of the program is to protect our natural resources that -- and the reason

00:08:35.440 --> 00:08:40.080
 that we're looking to protect our natural resources is that we identify that there are

00:08:40.080 --> 00:08:48.720
 ecological benefits that both provide for the community's health as well as our overall

00:08:48.720 --> 00:08:50.260
 enjoyment.

00:08:50.260 --> 00:08:59.360
 And in some of those health benefits includes clean water, clean air, and cleaner soil.

00:08:59.360 --> 00:09:06.260
 And it's -- the adoption and the enforcement and the implementation of these programs is

00:09:06.260 --> 00:09:11.600
 also consistent with Denton's 2040 comprehensive plan.

00:09:11.600 --> 00:09:17.680
 I wanted to highlight here a couple of community benefits and the protection of these environmentally

00:09:17.680 --> 00:09:19.480
 sensitive areas.

00:09:19.480 --> 00:09:29.680
 There is -- there are some -- I want to say federal -- national and local studies that

00:09:29.680 --> 00:09:35.800
 have been performed looking at the economic benefits and the protection of these environmentally

00:09:35.800 --> 00:09:43.640
 sensitive areas and highlighting some of those economic values both for the protection of

00:09:43.640 --> 00:09:48.400
 the waterways and air with the protection of trees.

00:09:48.400 --> 00:09:55.200
 And then in addition to that, doing the opposite and highlighting where a riparian buffer was

00:09:55.200 --> 00:10:05.120
 not protected and was removed and the degradation of the stream system over time, as you can

00:10:05.120 --> 00:10:08.720
 see here in this series of pictures.

00:10:08.720 --> 00:10:12.920
 So that's the why and what are we protecting.

00:10:12.920 --> 00:10:14.800
 These are the four different types.

00:10:14.800 --> 00:10:19.640
 So in the development code, we identified four distinct types of environmentally sensitive

00:10:19.640 --> 00:10:26.600
 areas, going from our floodplains to riparian buffers and water-related habitats or floodplains

00:10:26.600 --> 00:10:32.960
 being the wider or the greater extent around those waterways and then getting closer to

00:10:32.960 --> 00:10:36.700
 the waterways with the riparian buffers and the water-related habitats.

00:10:36.700 --> 00:10:42.920
 And as we get closer to the waterways, the protection requirements are much more stringent

00:10:42.920 --> 00:10:49.640
 recognizing that there's a lot more vulnerability within -- as you get closer to the waterways.

00:10:49.640 --> 00:11:01.800
 And then retaining some of our historical context of this community and retaining the

00:11:01.800 --> 00:11:08.900
 protection of some of the important tree oak species, the post oaks.

00:11:08.900 --> 00:11:15.120
 We have the Crest Timbers upland habitats and the protection of those stands and that

00:11:15.120 --> 00:11:20.840
 specific type of -- a unique habitat type.

00:11:20.840 --> 00:11:29.200
 And so how do we go about identifying those areas that are environmentally sensitive areas?

00:11:29.200 --> 00:11:36.640
 So back in the early 2000s, maybe a little bit before then, there were researchers who

00:11:36.640 --> 00:11:46.400
 compiled a set of data, aerial photography and other data, and they came up with a map.

00:11:46.400 --> 00:11:52.160
 And this map was just a generally -- here's where we believe these environmentally sensitive

00:11:52.160 --> 00:11:54.240
 areas may be located.

00:11:54.240 --> 00:12:01.000
 And the city council at the time, recognizing that there was still quite a lot of information

00:12:01.000 --> 00:12:08.360
 that still needed to be gathered, put together or asked for what is called an ESA field assessment.

00:12:08.360 --> 00:12:14.820
 And through this procedure that's outlined in the development code, when applicants come

00:12:14.820 --> 00:12:21.580
 in and say we want to develop our private land, we then ask for them to identify and

00:12:21.580 --> 00:12:28.520
 confirm either the presence or identify the presence of any areas that are on their property.

00:12:28.520 --> 00:12:32.840
 And through that field assessment, we also update the location and the extent of those

00:12:32.840 --> 00:12:35.160
 areas.

00:12:35.160 --> 00:12:40.800
 And then every time that those projects come in and I update the map, we reflect it on

00:12:40.800 --> 00:12:43.920
 our interactive map.

00:12:43.920 --> 00:12:51.680
 So once we have established the location of those areas, then the development community

00:12:51.680 --> 00:12:57.960
 has general applicability standards in order to protect and preserve those environmentally

00:12:57.960 --> 00:12:59.620
 sensitive areas.

00:12:59.620 --> 00:13:08.460
 And then once they have designed their site, then staff is reviewing against the code protection

00:13:08.460 --> 00:13:14.840
 requirements for that criteria for approval.

00:13:14.840 --> 00:13:21.360
 For projects that cannot design their site to meet that criteria for approval, can seek

00:13:21.360 --> 00:13:28.960
 a relief through a flexible and discretionary process that is called the alternative ESA

00:13:28.960 --> 00:13:33.160
 plan, also established within the DIT and development code.

00:13:33.160 --> 00:13:40.540
 And we work with the developer to come up with a mitigation plan to offset for the ecological

00:13:40.540 --> 00:13:46.360
 benefits that are being lost through the encroachments that they are proposing.

00:13:46.360 --> 00:13:53.520
 And then with that plan, we are looking for them to meet those criteria for approval,

00:13:53.520 --> 00:14:00.760
 including restoring or replacing the ESAs, preserving what's remaining, maximizing community

00:14:00.760 --> 00:14:02.480
 access, things like that.

00:14:02.480 --> 00:14:07.600
 And then we present it to this body for a recommendation to the city council for seeking

00:14:07.600 --> 00:14:10.640
 their approval of that plan.

00:14:10.640 --> 00:14:16.280
 And lastly, I wanted to plug that we have a webpage that we have put together in order

00:14:16.280 --> 00:14:22.220
 to help explain some of the complexities of this program.

00:14:22.220 --> 00:14:28.040
 And on that site, we also have put together a guidance document that we affectionately

00:14:28.040 --> 00:14:33.960
 call the ESA primer, and within that ESA primer, we outline everything that we think that a

00:14:33.960 --> 00:14:41.000
 developer, a landowner, would want to know about what they have on their property, hoping

00:14:41.000 --> 00:14:46.480
 that we can kind of facilitate moving their project along.

00:14:46.480 --> 00:14:49.680
 And with that, I'll take any questions.

00:14:49.680 --> 00:14:50.680
 Thank you, Christy.

00:14:50.680 --> 00:14:51.680
 Questions for Christy?

00:14:51.680 --> 00:14:52.680
 Commissioner Pruitt?

00:14:52.680 --> 00:14:53.680
 Thank you, Chair.

00:14:53.680 --> 00:15:01.240
 I'll start off with what I think is the easier one, and then I have a second one that I just

00:15:01.240 --> 00:15:03.960
 am curious about.

00:15:03.960 --> 00:15:11.680
 My understanding is that when a developer comes in, if the ESA area is, as you described,

00:15:11.680 --> 00:15:18.880
 not up to date, hasn't been updated in a long time, they can hire a consultant to go redefine

00:15:18.880 --> 00:15:21.880
 where that is.

00:15:21.880 --> 00:15:22.880
 And that's at their cost.

00:15:22.880 --> 00:15:25.280
 Is that correct?

00:15:25.280 --> 00:15:26.400
 Yes.

00:15:26.400 --> 00:15:27.800
 Okay.

00:15:27.800 --> 00:15:33.840
 Do we have an opportunity in cases where it makes sense to work with the development community

00:15:33.840 --> 00:15:42.760
 to expand the scope of a particular reassessment of a riparian area, if it would add value to

00:15:42.760 --> 00:15:48.120
 plans that the city has for adjacent lands, does that make sense?

00:15:48.120 --> 00:15:50.320
 Or is that something that's out of scope of the process?

00:15:50.320 --> 00:15:51.320
 Yeah.

00:15:51.320 --> 00:15:52.320
 It's out of scope.

00:15:52.320 --> 00:15:53.320
 Okay.

00:15:53.320 --> 00:15:59.440
 For the short answer, the development code clearly states it's either 50 feet or 100

00:15:59.440 --> 00:16:02.800
 feet from the center line of the channel.

00:16:02.800 --> 00:16:05.280
 That is for the riparian buffers.

00:16:05.280 --> 00:16:10.720
 Sometimes we find wetlands or bottomland high-wood forests.

00:16:10.720 --> 00:16:15.920
 Sometimes we find these areas that were not on the map originally, and once the wetland

00:16:15.920 --> 00:16:21.520
 specialist is out there performing the work, they will identify these areas and they will

00:16:21.520 --> 00:16:23.000
 add it to the map.

00:16:23.000 --> 00:16:24.000
 Sure.

00:16:24.000 --> 00:16:25.000
 Yeah.

00:16:25.000 --> 00:16:27.520
 I guess I was more curious, and it's out of scope, that's fine.

00:16:27.520 --> 00:16:36.280
 But not necessarily of other regions on the land being surveyed, but potentially if the

00:16:36.280 --> 00:16:43.140
 existing knowledge of Anissa was very, very old and it's changed a lot, does it also change

00:16:43.140 --> 00:16:47.560
 a lot on the areas adjacent to the property of interest?

00:16:47.560 --> 00:16:48.560
 That sort of question.

00:16:48.560 --> 00:16:49.560
 But that's fine.

00:16:49.560 --> 00:16:51.560
 I was just curious.

00:16:51.560 --> 00:16:55.640
 Typically, consultants will limit their study to the property that's owned by the person

00:16:55.640 --> 00:16:58.480
 who is hiring them.

00:16:58.480 --> 00:17:03.800
 We also have in the code that east of field assessments expire after two years.

00:17:03.800 --> 00:17:12.000
 So, if the assessment is kind of older, then I also expire it on the map and indicating

00:17:12.000 --> 00:17:16.040
 to a future landowner that they'll have to redo that work.

00:17:16.040 --> 00:17:17.040
 Got it.

00:17:17.040 --> 00:17:18.040
 Okay.

00:17:18.040 --> 00:17:19.040
 No, that helps a lot to know that.

00:17:19.040 --> 00:17:23.960
 And then the second question is I saw on one of the slides toward the end, there was a

00:17:23.960 --> 00:17:30.600
 mention that the ESA requirements apply to properties in the ETJ.

00:17:30.600 --> 00:17:31.600
 Oh, yes.

00:17:31.600 --> 00:17:32.600
 I'm sorry.

00:17:32.600 --> 00:17:35.920
 I glossed over that because I kind of forgot to mention it.

00:17:35.920 --> 00:17:36.920
 Yes.

00:17:36.920 --> 00:17:37.920
 No, that's fine.

00:17:37.920 --> 00:17:47.480
 My familiarity with our ability to provide restrictions within the ETJ is it's basically

00:17:47.480 --> 00:17:49.360
 the subdivision requirements.

00:17:49.360 --> 00:17:53.840
 And so, can you help explain what our role is for that?

00:17:53.840 --> 00:17:54.840
 Sure.

00:17:54.840 --> 00:17:55.840
 Yes.

00:17:55.840 --> 00:18:03.000
 So, within the ETJ, there is a provision in the state code that says that cities have

00:18:03.000 --> 00:18:11.880
 regulatory authority over floodplains for the protection of the community's flood protection

00:18:11.880 --> 00:18:13.520
 purposes.

00:18:13.520 --> 00:18:17.640
 And we apply that to the environmentally sensitive areas as well.

00:18:17.640 --> 00:18:23.480
 So, just in the undeveloped floodplain portion of the code, we do apply that and require

00:18:23.480 --> 00:18:26.400
 the protection of the undeveloped floodplain.

00:18:26.400 --> 00:18:27.400
 Okay.

00:18:27.400 --> 00:18:28.400
 Thank you.

00:18:28.400 --> 00:18:29.400
 Other questions?

00:18:29.400 --> 00:18:36.480
 Christy, are we doing any proactive study or no?

00:18:36.480 --> 00:18:37.480
 Yes.

00:18:37.480 --> 00:18:38.480
 We have --

00:18:38.480 --> 00:18:41.480
 Can you talk about that?

00:18:41.480 --> 00:18:42.480
 Yeah.

00:18:42.480 --> 00:18:45.560
 Can you explain a little bit about the UNT?

00:18:45.560 --> 00:18:46.560
 Okay.

00:18:46.560 --> 00:18:53.000
 So, in the last few years, that map is old, and I know it's old.

00:18:53.000 --> 00:18:59.880
 And using data that's over 20 years old, it does lead for a lot of changes.

00:18:59.880 --> 00:19:00.880
 Sure.

00:19:00.880 --> 00:19:03.800
 And so, I'm hoping that we can work with UNT.

00:19:03.800 --> 00:19:12.920
 We have a contract in works with them to have some of their grad students use, hopefully,

00:19:12.920 --> 00:19:23.600
 some AI and newer technology to help us identify more concisely the environmentally sensitive

00:19:23.600 --> 00:19:26.480
 areas that are on the remaining properties.

00:19:26.480 --> 00:19:27.480
 Okay.

00:19:27.480 --> 00:19:28.480
 Yeah, that's great.

00:19:28.480 --> 00:19:30.120
 Is that something that's just been started, or --

00:19:30.120 --> 00:19:31.120
 Yes.

00:19:31.120 --> 00:19:32.120
 Yes.

00:19:32.120 --> 00:19:34.000
 It's just in the very beginning stages.

00:19:34.000 --> 00:19:40.120
 That sounds positive, though, because you're relying on old data, I know, and then we're

00:19:40.120 --> 00:19:41.120
 relying on --

00:19:41.120 --> 00:19:42.120
 Consultants.

00:19:42.120 --> 00:19:45.680
 Consultants that we don't know.

00:19:45.680 --> 00:19:51.240
 When a consultant -- I mean, the report comes to you, obviously, after it's done.

00:19:51.240 --> 00:19:52.240
 What is the procedure?

00:19:52.240 --> 00:19:55.880
 I mean, do you end up on the ground out there ever?

00:19:55.880 --> 00:19:56.880
 Sometimes, yes.

00:19:56.880 --> 00:19:57.880
 Okay.

00:19:57.880 --> 00:19:58.880
 And it's --

00:19:58.880 --> 00:19:59.880
 Depending?

00:19:59.880 --> 00:20:00.880
 The best moments for me.

00:20:00.880 --> 00:20:01.880
 Right.

00:20:01.880 --> 00:20:03.720
 I could imagine it is, yes.

00:20:03.720 --> 00:20:04.720
 Yes.

00:20:04.720 --> 00:20:08.040
 Sometimes we do go out there when we have questions.

00:20:08.040 --> 00:20:13.280
 There was a property off of I-35, west of 35, recently.

00:20:13.280 --> 00:20:18.840
 They had some beautiful wetlands, and they just -- there were so many questions, because

00:20:18.840 --> 00:20:26.200
 there was some really great areas, and so we walked the site with them to kind of help

00:20:26.200 --> 00:20:29.640
 make some decisions on what was and what wasn't.

00:20:29.640 --> 00:20:30.640
 Yeah.

00:20:30.640 --> 00:20:31.640
 Yeah, that's awesome.

00:20:31.640 --> 00:20:32.640
 That's awesome.

00:20:32.640 --> 00:20:33.640
 Well, good.

00:20:33.640 --> 00:20:34.640
 Any other questions?

00:20:34.640 --> 00:20:35.640
 Okay.

00:20:35.640 --> 00:20:37.640
 Thank you for the presentation.

00:20:37.640 --> 00:20:38.640
 Sure.

00:20:38.640 --> 00:20:41.360
 It would be great to get an update once that project starts.

00:20:41.360 --> 00:20:42.360
 Yes.

00:20:42.360 --> 00:20:43.360
 Okay.

00:20:43.360 --> 00:20:44.360
 You know, down the road.

00:20:44.360 --> 00:20:45.360
 Yes.

00:20:45.360 --> 00:20:48.960
 I think that would be a great future work session, down the road, to just hear how that's

00:20:48.960 --> 00:20:49.960
 going and all that.

00:20:49.960 --> 00:20:50.960
 Yeah.

00:20:50.960 --> 00:20:51.960
 It'll take a little bit of time.

00:20:51.960 --> 00:20:52.960
 Sure.

00:20:52.960 --> 00:20:53.960
 Of course.

00:20:53.960 --> 00:20:54.960
 Absolutely.

00:20:54.960 --> 00:20:55.960
 Yeah.

00:20:55.960 --> 00:20:56.960
 Okay.

00:20:56.960 --> 00:20:57.960
 Thank you very much.

00:20:57.960 --> 00:20:58.960
 Sure.

00:20:58.960 --> 00:20:59.960
 Okay.

00:20:59.960 --> 00:21:00.960
 With that, that concludes our work session, so I'll go ahead and close us at 522 p.m.

00:21:00.960 --> 00:21:12.040
 and we will reconvene in council chambers at 630.

00:21:12.040 --> 00:21:15.260
 Good evening and welcome to the City of Denton's Planning and Zoning Commission meeting for

00:21:15.260 --> 00:21:18.640
 Wednesday, March 1st, 2023.

00:21:18.640 --> 00:21:22.520
 With a quorum present, I will call us to order at 630 p.m.

00:21:22.520 --> 00:21:25.840
 The first item on our agenda this evening is the Pledge of Allegiance to the U.S. and

00:21:25.840 --> 00:21:31.000
 Texas Blacks.

00:21:31.000 --> 00:21:38.160
 I pledge allegiance to the Black of the United States of America and to the Republic for

00:21:38.160 --> 00:21:43.320
 which it stands, one nation, under God, indivisible, with liberty and justice for all.

00:21:43.320 --> 00:21:55.360
 With Texas Black, I pledge allegiance to thee, Texas, one state, under God, one and indivisible.

00:21:55.360 --> 00:21:57.060
 Thank you.

00:21:57.060 --> 00:22:03.920
 Next item on our agenda is the consideration of approval of our minutes for February 15th.

00:22:03.920 --> 00:22:04.920
 Commissioner Smith?

00:22:04.920 --> 00:22:06.320
 Make a motion to approve.

00:22:06.320 --> 00:22:07.320
 Commissioner Anderson?

00:22:07.320 --> 00:22:08.320
 Second.

00:22:08.320 --> 00:22:11.060
 We've got a first and a second for approval of the minutes.

00:22:11.060 --> 00:22:13.640
 Any discussion?

00:22:13.640 --> 00:22:21.740
 Seeing none, let's vote on the board, please.

00:22:21.740 --> 00:22:23.480
 That motion will carry 7-0.

00:22:23.480 --> 00:22:27.720
 That will bring us to our items for individual consideration.

00:22:27.720 --> 00:22:31.760
 3A is Z220019A.

00:22:31.760 --> 00:22:34.920
 I'll invite Ron up for presentation of this item.

00:22:34.920 --> 00:22:35.920
 Good evening, Ron.

00:22:35.920 --> 00:22:41.440
 Good evening, Mr. Chairman, Commissioner Brown, with Wellman Services, Principal Planner.

00:22:41.440 --> 00:22:58.160
 Should we get the right presentation here?

00:22:58.160 --> 00:23:03.680
 Just for background information, this item has been considered, was considered at our

00:23:03.680 --> 00:23:07.320
 February 15th, 2023 Planning Zoning Commission.

00:23:07.320 --> 00:23:14.360
 At that time, the item, the public hearing for that item, that is, was open and closed.

00:23:14.360 --> 00:23:19.360
 There was then a motion for denial, which resulted in a tally vote 3-3.

00:23:19.360 --> 00:23:24.880
 Per our development code, the process or procedure in which a tally vote happens at P&Z, it is

00:23:24.880 --> 00:23:29.680
 scheduled for the next meeting, and at the next meeting, it's reconsidered or considered

00:23:29.680 --> 00:23:34.080
 again for an IC item.

00:23:34.080 --> 00:23:37.480
 If there is a result of a tally vote, which I don't think will happen since we have seven

00:23:37.480 --> 00:23:41.880
 members here, so we won't go into those details.

00:23:41.880 --> 00:23:49.520
 So the request before you today is a zoning to an LI, Light Industrial Zoning District.

00:23:49.520 --> 00:23:53.880
 The subject property that you see outlined in yellow was annexed in January of this year,

00:23:53.880 --> 00:23:55.360
 on January.

00:23:55.360 --> 00:24:02.280
 This was following a rezoning of the southern track to LI, which was in September of 2022.

00:24:02.280 --> 00:24:04.560
 The site is approximately 18.6 acres.

00:24:04.560 --> 00:24:07.320
 You can see it's undeveloped.

00:24:07.320 --> 00:24:12.960
 Primary arterials are Thomas Egan to the west, University generally to the south, and again,

00:24:12.960 --> 00:24:19.780
 the application or the purpose for the zoning is to facilitate the proposed use of an industrial

00:24:19.780 --> 00:24:23.160
 use on the property.

00:24:23.160 --> 00:24:26.720
 Just wanted to show before and after of what the current zoning is.

00:24:26.720 --> 00:24:32.360
 You can see that the current zoning as of today has an RR designation just because it

00:24:32.360 --> 00:24:33.480
 was recently annexed.

00:24:33.480 --> 00:24:37.000
 That's that designation that we assigned for those properties.

00:24:37.000 --> 00:24:42.800
 The application or applicant is requesting an LI, which would make it the blue that you

00:24:42.800 --> 00:24:49.520
 see here, again, similar to what was rezoned back in September.

00:24:49.520 --> 00:24:54.920
 City Line Use shows the property as Light Industrial, and Light Industrial for this area

00:24:54.920 --> 00:25:05.120
 was updated back when the comprehensive plan was updated back in March of 2022.

00:25:05.120 --> 00:25:08.520
 I know at the last meeting there was a lot of discussion related to municipal utility

00:25:08.520 --> 00:25:09.520
 district.

00:25:09.520 --> 00:25:15.080
 I just wanted to show this slide where the municipal utility districts are shown.

00:25:15.080 --> 00:25:20.520
 You can see in the yellow circle here is where the site is generally located, and then to

00:25:20.520 --> 00:25:28.240
 the west of that property you can see in pink, all of those are identified as either existing

00:25:28.240 --> 00:25:31.840
 or proposed, or potential municipal utility district.

00:25:31.840 --> 00:25:38.780
 Again, the majority of them are located west of the subject property.

00:25:38.780 --> 00:25:46.160
 The one real close and adjacent to the subject property is the Legends Ranch MUD, M-U-D,

00:25:46.160 --> 00:25:47.760
 Municipal Utility District.

00:25:47.760 --> 00:25:53.600
 The subject site is shown here, generally this area to the southeast corner.

00:25:53.600 --> 00:25:59.320
 Directly across the street, across over to Thomas Egan, that is, is what is being proposed

00:25:59.320 --> 00:26:05.180
 as future commercial along University, and then you can see the rest of the development

00:26:05.180 --> 00:26:11.120
 has residential, single family, and then further to the west of that is, right in this general

00:26:11.120 --> 00:26:13.600
 location, is a future multi-family development.

00:26:13.600 --> 00:26:22.040
 So, again, this is the proposed land use for the Legends Ranch MUD.

00:26:22.040 --> 00:26:27.640
 We talked a little bit about how the future land use designation was assigned as slide

00:26:27.640 --> 00:26:28.640
 industrial.

00:26:28.640 --> 00:26:33.120
 I think one of my reasons, or one of the reasons I provided during that time was the extension

00:26:33.120 --> 00:26:34.120
 of Loop 288.

00:26:34.120 --> 00:26:39.520
 So, I wanted to just give some context of where that is, so the Loop 288 is just along

00:26:39.520 --> 00:26:45.520
 this alignment here, just going to be west of the airport, and the subject site is just

00:26:45.520 --> 00:26:49.120
 to the west of that future extension.

00:26:49.120 --> 00:26:54.880
 Also, the other reason that was provided is because, for slide industrial, is the area

00:26:54.880 --> 00:27:01.140
 that we see dotted here are all the gas wells that we have documented within the city.

00:27:01.140 --> 00:27:07.100
 Most of it, of course, is on the west side of I-35W and I-35 North.

00:27:07.100 --> 00:27:13.640
 The subject property is shown here in the yellow circle, and also the gas wells, again,

00:27:13.640 --> 00:27:19.760
 are west of the subject property, or in and around the subject property.

00:27:19.760 --> 00:27:25.040
 Staff did look at the criteria of approval for a zoning case, a zoning request that is,

00:27:25.040 --> 00:27:29.080
 and per the development code, staff reviewed those criteria.

00:27:29.080 --> 00:27:34.160
 It is consistent with the future land use map, which is in the DEN Development Code,

00:27:34.160 --> 00:27:39.400
 I'm sorry, the DEN 2040 comprehensive plan, consistent with the future land, the allied

00:27:39.400 --> 00:27:42.000
 purpose statement in the development code.

00:27:42.000 --> 00:27:45.800
 Zoning is not expected to generate significant adverse as far as environmental, infrastructure,

00:27:45.800 --> 00:27:53.640
 or fiscal impacts, and the utilities will be extended as the property is developed.

00:27:53.640 --> 00:27:56.000
 Notifications were sent out for this item.

00:27:56.000 --> 00:28:02.880
 As of this afternoon, this evening, staff has not received any in opposition or in favor.

00:28:02.880 --> 00:28:09.120
 Lastly, staff's recommending approval of this initial zoning district to ally as it meets

00:28:09.120 --> 00:28:14.500
 the criteria of the outline in the development code.

00:28:14.500 --> 00:28:16.280
 With that, I'll stand for any questions.

00:28:16.280 --> 00:28:20.280
 The applicant also has a presentation and is available for any questions that the commission

00:28:20.280 --> 00:28:21.280
 may have.

00:28:21.280 --> 00:28:22.280
 Great.

00:28:22.280 --> 00:28:23.280
 Thank you, Ron.

00:28:23.280 --> 00:28:26.340
 Are there any questions right now for Ron?

00:28:26.340 --> 00:28:27.720
 Okay.

00:28:27.720 --> 00:28:28.720
 I do not see any.

00:28:28.720 --> 00:28:29.720
 Oh, Commissioner Smith.

00:28:29.720 --> 00:28:30.720
 Thank you, Chair.

00:28:30.720 --> 00:28:36.040
 The lower part of the subject property, Ron, that was zoned ally back in September 2022,

00:28:36.040 --> 00:28:39.080
 that was the same applicant, correct, and the requestant?

00:28:39.080 --> 00:28:40.920
 Thank you.

00:28:40.920 --> 00:28:41.920
 Okay.

00:28:41.920 --> 00:28:44.980
 Thanks, Ron.

00:28:44.980 --> 00:28:49.820
 This is not a public hearing, but we do allow comments from the public on our individual

00:28:49.820 --> 00:28:51.840
 consideration items.

00:28:51.840 --> 00:28:55.000
 So Clint, I believe, are you the applicant on it?

00:28:55.000 --> 00:28:56.000
 Yes.

00:28:56.000 --> 00:28:58.840
 I'll go ahead and invite you up, and then I've got a couple other cards wishing to speak.

00:28:58.840 --> 00:29:00.720
 If you'll state your name and address your time, we'll begin.

00:29:00.720 --> 00:29:01.720
 Thank you.

00:29:01.720 --> 00:29:02.720
 Great.

00:29:02.720 --> 00:29:08.920
 Yeah, I'm Clint Riley on behalf of the property owner and developer.

00:29:08.920 --> 00:29:11.240
 We've been dealing with this for quite some time, and I really just wanted to show up

00:29:11.240 --> 00:29:16.280
 today and just kind of explain to be sure you all are clear on kind of what the process

00:29:16.280 --> 00:29:18.280
 looked like.

00:29:18.280 --> 00:29:24.200
 We've been having dialogue with you guys since September of '21, well in advance when we

00:29:24.200 --> 00:29:27.320
 bought this tract.

00:29:27.320 --> 00:29:31.200
 We were really clear with your staff, hey, we think this is an industrial site.

00:29:31.200 --> 00:29:35.200
 Do you think it's an industrial site?

00:29:35.200 --> 00:29:44.680
 And we got positive feedback, and so we went through a process at that time to try to get

00:29:44.680 --> 00:29:50.200
 this, because it was already split zone, actually part was in the county and part was zone,

00:29:50.200 --> 00:29:53.000
 what was the first part, sir?

00:29:53.000 --> 00:29:54.000
 Rural residential.

00:29:54.000 --> 00:29:56.620
 Rural residential, so it was kind of like a mixed bag.

00:29:56.620 --> 00:30:03.600
 So the way we understood y'all's process is that it would make more sense for us for this

00:30:03.600 --> 00:30:08.320
 to all happen at one, because buying something that's part residential and part commercial

00:30:08.320 --> 00:30:09.320
 doesn't make a lot of sense.

00:30:09.320 --> 00:30:13.740
 Buying something that's part city of Denver and part county doesn't make a lot of sense.

00:30:13.740 --> 00:30:21.060
 So we embarked on this really long consuming process to try to get what we thought we were

00:30:21.060 --> 00:30:28.080
 going to get at the beginning, which was 28 acre tract for one high quality institutional

00:30:28.080 --> 00:30:29.080
 industrial development.

00:30:29.080 --> 00:30:36.160
 But instead, we had to get a partial zoning, which we got, understand we got unanimous

00:30:36.160 --> 00:30:42.960
 support from this group, and our next step was, okay, we need to annex this, and part

00:30:42.960 --> 00:30:43.960
 was annexation.

00:30:43.960 --> 00:30:50.920
 We asked for a conditional annex to get the industrial, so the whole tract has the industrial

00:30:50.920 --> 00:30:51.920
 nature.

00:30:51.920 --> 00:30:53.640
 I've been an industrial broker for 20 years.

00:30:53.640 --> 00:30:56.800
 I think this has attributes that you would look for for industrial.

00:30:56.800 --> 00:31:01.120
 I mean, it's not great to put your house, some kind of residential component, right

00:31:01.120 --> 00:31:04.360
 on 380, with as much frontage and noise and things that are going on right there.

00:31:04.360 --> 00:31:09.320
 So we've got a big drainage basin to the back, we've got a lot of frontage on 380,

00:31:09.320 --> 00:31:15.800
 and I think this property lends itself to a low impact, you know, high tax generating

00:31:15.800 --> 00:31:17.120
 component for the city.

00:31:17.120 --> 00:31:20.160
 So that's kind of what we've been through.

00:31:20.160 --> 00:31:25.600
 So anyway, I love answering questions you guys may have if y'all don't understand what

00:31:25.600 --> 00:31:29.640
 we're trying to do or why we did what we did, but I think we've been really great stewards

00:31:29.640 --> 00:31:30.640
 of this process.

00:31:30.640 --> 00:31:34.400
 We've been really clear in telegraphing what we've been trying to do since well before

00:31:34.400 --> 00:31:37.400
 we made a multi-million dollar commitment to buy this.

00:31:37.400 --> 00:31:41.160
 And I love to answer any questions that you guys may have because it feels like a couple

00:31:41.160 --> 00:31:47.000
 weeks ago we went from having, you know, unlimited support to a mixed bag and nothing's changed

00:31:47.000 --> 00:31:48.440
 in 18 months on our end.

00:31:48.440 --> 00:31:52.040
 So a far way.

00:31:52.040 --> 00:31:53.040
 Thank you, Mr. Riley.

00:31:53.040 --> 00:31:56.320
 Any questions at this point?

00:31:56.320 --> 00:31:57.320
 Commissioner Cole.

00:31:57.320 --> 00:31:58.320
 Thank you, Chair.

00:31:58.320 --> 00:32:04.280
 I think what popped up between now and then is the realization of all the single family

00:32:04.280 --> 00:32:11.040
 homes that are going in next to it to the west and to the southwest.

00:32:11.040 --> 00:32:15.480
 That's all going to be single family, yeah, there's going to be some commercial, sure.

00:32:15.480 --> 00:32:22.760
 But LI is, I still, I'm not going to support this, but it's too, in my opinion, too invasive

00:32:22.760 --> 00:32:26.920
 next and too intensive next to single family homes.

00:32:26.920 --> 00:32:30.680
 LI, you won't, I mean, you generally don't see that right next to these developments.

00:32:30.680 --> 00:32:36.920
 So there's a giant river basin on one side of the property, 380 on the other side of

00:32:36.920 --> 00:32:40.920
 the property, and the back end of a development that's not even in y'all's jurisdiction as

00:32:40.920 --> 00:32:43.640
 it's currently constituted, the way I understand it.

00:32:43.640 --> 00:32:46.800
 We've actually been working with that developer, we granted them an easement, they've been

00:32:46.800 --> 00:32:51.200
 in our office several times, like we're trying to help them get what they need.

00:32:51.200 --> 00:32:58.800
 LI, I mean, that's, I live in Coppell, they love LI, it's generally favorable, there's

00:32:58.800 --> 00:33:03.120
 really no fumes, dust, I mean, it's an institutional warehouse.

00:33:03.120 --> 00:33:07.600
 You've got them up and down 380 that are done really well, they're really high quality and

00:33:07.600 --> 00:33:13.560
 I understand your concern, but put yourself in my shoes, I've been trying to get this

00:33:13.560 --> 00:33:19.760
 done for 18 months, I've voluntarily annexed, based on the support of recommendations and

00:33:19.760 --> 00:33:23.240
 support of this city, and I made a multi-million dollar commitment based on that.

00:33:23.240 --> 00:33:27.760
 So I understand, put yourself in my shoes if you don't mind.

00:33:27.760 --> 00:33:33.120
 And I am, but I mean, something less intensive, I would be happy with.

00:33:33.120 --> 00:33:37.680
 There's nothing less intensive, there's no school, you don't have to provide school to

00:33:37.680 --> 00:33:43.960
 industrial users, we bring in a ton of infrastructure, again, there's no noise, there's a big tax

00:33:43.960 --> 00:33:48.520
 base, it looks like you're going to get a big institutional name, and you're going to

00:33:48.520 --> 00:33:51.200
 get your residential neighborhood right next door to it.

00:33:51.200 --> 00:33:59.600
 So I live out there, all my life, and this was a rural area, rural homes, now we're all

00:33:59.600 --> 00:34:08.400
 surrounded by LI, and I can tell you from experience, it's rocky, it hadn't been smooth,

00:34:08.400 --> 00:34:15.240
 and it's, you know, dropped the quality of life of people that live around there, and

00:34:15.240 --> 00:34:25.320
 on the 380, I mean, I appreciate what you're doing, you know, but still, I mean, one thing

00:34:25.320 --> 00:34:29.680
 we're not still, I mean, we're kind of under the thing, what else is an ETJ, so who cares,

00:34:29.680 --> 00:34:32.160
 you know, but there's something about being a good neighbor.

00:34:32.160 --> 00:34:39.600
 I've known this before I annexed, that y'all weren't going to support it, you know, we've

00:34:39.600 --> 00:34:49.120
 been all ears on this process for well over a year now, and the industrial in the back

00:34:49.120 --> 00:34:53.160
 of Mosh Branch is not the same industrial that we're talking about for LI, I mean, you

00:34:53.160 --> 00:34:57.520
 see, you've got brand new development up and down 380 that is high quality industrial,

00:34:57.520 --> 00:34:58.520
 and that's what you build.

00:34:58.520 --> 00:35:01.520
 So in your mind, what are you thinking?

00:35:01.520 --> 00:35:07.960
 200,000 square foot, tilt wall warehouse, front park rear load, 32 clear, ESFR, I mean,

00:35:07.960 --> 00:35:12.840
 we do this, do this for a living, I'm building about a million square feet roundup industrial,

00:35:12.840 --> 00:35:18.160
 some of it's built to suit, I do it around the country for publicly traded national credit

00:35:18.160 --> 00:35:21.600
 tenants, so you're not going to have metal warehouse like you have on the back of Mosh

00:35:21.600 --> 00:35:24.320
 Branch, you're just not going to.

00:35:24.320 --> 00:35:25.320
 But you could.

00:35:25.320 --> 00:35:26.320
 You could.

00:35:26.320 --> 00:35:27.320
 Right?

00:35:27.320 --> 00:35:28.320
 Yeah.

00:35:28.320 --> 00:35:29.320
 But you could.

00:35:29.320 --> 00:35:30.320
 You could.

00:35:30.320 --> 00:35:31.320
 Okay.

00:35:31.320 --> 00:35:32.320
 Thanks.

00:35:32.320 --> 00:35:33.320
 Appreciate it.

00:35:33.320 --> 00:35:34.320
 Yeah.

00:35:34.320 --> 00:35:38.560
 I don't see any other questions at this time, Mr. Olley, thank you so much.

00:35:38.560 --> 00:35:42.280
 I do have another card here, Sylvia Phillips.

00:35:42.280 --> 00:35:48.520
 Hi, Ms. Phillips, if you could give your name and address, your time will begin.

00:35:48.520 --> 00:35:52.200
 My name is Sylvia Phillips, and I'm not that tall.

00:35:52.200 --> 00:36:02.640
 I live at 2801 South Highway 377 and Crossroads, and my home is located two-tenths of a mile

00:36:02.640 --> 00:36:05.840
 north of Highway 380.

00:36:05.840 --> 00:36:11.000
 So I feel that I'm qualified to speak to you about the quality of life in a single family

00:36:11.000 --> 00:36:14.560
 community adjacent to 380.

00:36:14.560 --> 00:36:22.120
 When I moved here in 2004, we had about 30,000 cars per day moving on 380.

00:36:22.120 --> 00:36:29.080
 Some 19 years later, we now have 70,000 cars per day on 380.

00:36:29.080 --> 00:36:34.600
 Scott has already announced, yet, the next expansion plans for 380.

00:36:34.600 --> 00:36:41.960
 It's to be doubled in width, and it is still under construction from this round of 380.

00:36:41.960 --> 00:36:51.120
 So what I want to say to you is living adjacent to or in the vicinity of sound traffic from

00:36:51.120 --> 00:36:53.460
 380 is very intrusive.

00:36:53.460 --> 00:36:56.160
 There's a constant roar.

00:36:56.160 --> 00:37:00.040
 It can be heard easily a half-mile north of 380.

00:37:00.040 --> 00:37:05.520
 And when the ambulance runs through, all the neighborhood dogs set off howling.

00:37:05.520 --> 00:37:14.080
 So I wonder if any of you all have ever noticed driving from Dallas, North Dallas tollway,

00:37:14.080 --> 00:37:18.400
 out this direction, that there's some areas of depressed roadway.

00:37:18.400 --> 00:37:22.760
 The purpose of depressing that roadway, well, first of all, the only places I've seen that's

00:37:22.760 --> 00:37:28.840
 in Highland Park, but the purpose of depressing the roadway is that the sidewalls provide

00:37:28.840 --> 00:37:31.160
 sound attenuation.

00:37:31.160 --> 00:37:38.580
 They're baffling to deflect that road noise away from existing residents.

00:37:38.580 --> 00:37:43.680
 When an industrial or a business park is built, the walls that are constructed are typically

00:37:43.680 --> 00:37:51.520
 taller than a single-story residence, and they, in and of themselves, will provide sound

00:37:51.520 --> 00:37:55.800
 attenuation, baffling to deflect that sound away from there.

00:37:55.800 --> 00:38:01.460
 So I am stating to you that without a doubt, houses that are already in that community

00:38:01.460 --> 00:38:08.720
 that will be in the sound shed of this road will ultimately be protected from sound noise

00:38:08.720 --> 00:38:15.360
 because there is a project and a development built that serves to quiet and attenuate the

00:38:15.360 --> 00:38:17.560
 noise from their quality of lifestyle.

00:38:17.560 --> 00:38:22.040
 So this I'm saying to you from my personal experience and my observations.

00:38:22.040 --> 00:38:30.520
 I also think that in this particular application, there's a creek bed that buffers the natural

00:38:30.520 --> 00:38:38.000
 vegetation, the natural creek bed buffers the site and the sound from this project and

00:38:38.000 --> 00:38:40.000
 also further from the roadway.

00:38:40.000 --> 00:38:46.560
 So they are, in fact, in a much better situation on this site for it to have the light industrial

00:38:46.560 --> 00:38:50.160
 use and to have a business park granted.

00:38:50.160 --> 00:38:57.600
 So in addition to the business park being an asset, is that my time?

00:38:57.600 --> 00:38:58.600
 That is your time, but I'll let you wrap up.

00:38:58.600 --> 00:38:59.920
 Well, let me just sum up really quickly.

00:38:59.920 --> 00:39:00.920
 Sure.

00:39:00.920 --> 00:39:06.600
 This is very important for the School District of Crum to balance their tax revenue.

00:39:06.600 --> 00:39:10.760
 It will not generate one child who needs an education, but it will provide much, much

00:39:10.760 --> 00:39:14.320
 tax need and revenue to the School District of Crum.

00:39:14.320 --> 00:39:20.000
 And that will save and help the little man, the individual homeowner will appreciate this

00:39:20.000 --> 00:39:23.960
 more so than anybody will ever appreciate.

00:39:23.960 --> 00:39:24.960
 Thanks for sharing your thoughts.

00:39:24.960 --> 00:39:27.960
 Appreciate it.

00:39:27.960 --> 00:39:35.240
 I do have another card here, Sidney Evans.

00:39:35.240 --> 00:39:36.240
 You'll state your name and address.

00:39:36.240 --> 00:39:37.240
 Your time will begin.

00:39:37.240 --> 00:39:38.240
 Hello.

00:39:38.240 --> 00:39:39.240
 Yes, I'm Sidney Evans.

00:39:39.240 --> 00:39:40.240
 I live at 2209 High Meadow Drive.

00:39:40.240 --> 00:39:43.240
 I won't probably be quite as long-winded as my predecessors.

00:39:43.240 --> 00:39:48.680
 As a resident of Denton County now for about 20 years, and a homeowner in the city of Denton

00:39:48.680 --> 00:39:54.200
 for 10 years of that, I've lived in the city of limits and I've commuted past this property

00:39:54.200 --> 00:39:56.000
 for five years over at Airport Road.

00:39:56.000 --> 00:40:01.480
 I work for one of the larger manufacturers over there and have been privy to a lot of

00:40:01.480 --> 00:40:03.640
 the construction and things that have taken place.

00:40:03.640 --> 00:40:08.200
 That being said, I'm here to express my interest in favor of approving the request of light

00:40:08.200 --> 00:40:09.720
 industrial zoning.

00:40:09.720 --> 00:40:14.840
 The light industrial zoning not only complies with the precedented Denton 2040 comprehensive

00:40:14.840 --> 00:40:18.640
 plan, but it also coincides with surrounding property's approved usage.

00:40:18.640 --> 00:40:23.080
 But first and foremost, it serves a need in the community.

00:40:23.080 --> 00:40:26.400
 Many large manufacturing and distribution centers are located in the near vicinity.

00:40:26.400 --> 00:40:30.640
 My organization, as well as others along Airport Road and surrounding areas, continue to demand

00:40:30.640 --> 00:40:34.660
 overflow storage and staging zones for both raw materials and finished goods.

00:40:34.660 --> 00:40:37.000
 If you're aware of what's there, it's mostly food and beverage.

00:40:37.000 --> 00:40:42.560
 It's mostly very light industrial usage items that most of you probably have in your home

00:40:42.560 --> 00:40:43.560
 today.

00:40:43.560 --> 00:40:46.960
 We must be cognizant of our local manufacturers' needs, as well as the supply chain challenges

00:40:46.960 --> 00:40:50.880
 that we're all continuing to face that we really don't have a resolution to today.

00:40:50.880 --> 00:40:54.760
 By approving the subject property for light industrial use, you are supporting the immediate

00:40:54.760 --> 00:40:59.320
 need of local businesses and I ask that you vote yes in favor of supporting the zoning

00:40:59.320 --> 00:41:00.320
 request.

00:41:00.320 --> 00:41:01.320
 Thank you.

00:41:01.320 --> 00:41:04.440
 Thank you for sharing your thoughts.

00:41:04.440 --> 00:41:06.480
 I don't have any other cards in front of me.

00:41:06.480 --> 00:41:09.520
 Is there anyone else wishing to speak on this item?

00:41:09.520 --> 00:41:12.000
 In the audience?

00:41:12.000 --> 00:41:13.000
 Okay.

00:41:13.000 --> 00:41:17.520
 I can open up the floor here for further discussion or a motion.

00:41:17.520 --> 00:41:18.520
 Commissioner Smith?

00:41:18.520 --> 00:41:23.240
 I'm going to make a motion to approve this project as presented.

00:41:23.240 --> 00:41:28.320
 I hear Commissioner Cole's concerns and I would agree with you that if it wasn't, if

00:41:28.320 --> 00:41:33.800
 there weren't muds already out there, that you could possibly see overarching encroachment

00:41:33.800 --> 00:41:38.880
 of industrial further and further down, 380, but this does feel like it is going to be

00:41:38.880 --> 00:41:45.160
 a self-contained project and then to add to this even more, this commission voted to approve

00:41:45.160 --> 00:41:48.480
 the LI zoning there in September of 2022.

00:41:48.480 --> 00:41:52.040
 It's not that we should automatically say if we did something in the past, we should

00:41:52.040 --> 00:41:56.300
 approve and keep going forward in the future, but it meets the flume.

00:41:56.300 --> 00:41:58.320
 It makes sense for the area.

00:41:58.320 --> 00:42:01.760
 The single family residential that exists out there now is across the street from a record

00:42:01.760 --> 00:42:07.360
 service and other light industrial type of uses and so for us to walk away and say that

00:42:07.360 --> 00:42:11.280
 this project cannot move forward, it just doesn't make sense to me.

00:42:11.280 --> 00:42:13.480
 For that, I'll make the motion to approve as presented.

00:42:13.480 --> 00:42:14.480
 Thank you.

00:42:14.480 --> 00:42:15.480
 Commissioner Pruitt?

00:42:15.480 --> 00:42:17.720
 Yeah, I'll second.

00:42:17.720 --> 00:42:24.480
 For many of the same reasons, I'll just add that we're going to have to work through what

00:42:24.480 --> 00:42:34.880
 this area means in the future and for reasons of consistency and just what makes sense,

00:42:34.880 --> 00:42:43.200
 I think any other use here in the future would be very likely more intrusive.

00:42:43.200 --> 00:42:51.600
 We recently worked through some outdoor storage and other provisions in our code that I think

00:42:51.600 --> 00:42:59.200
 are well suited to mitigate issues that might arise and so for those reasons, I'm comfortable

00:42:59.200 --> 00:43:00.200
 with it.

00:43:00.200 --> 00:43:01.200
 Thank you.

00:43:01.200 --> 00:43:03.840
 We've got a first and a second for approval.

00:43:03.840 --> 00:43:06.760
 Any discussion?

00:43:06.760 --> 00:43:07.760
 Commissioner Villarreal?

00:43:07.760 --> 00:43:15.280
 I'm going to once again vote in denial of this motion.

00:43:15.280 --> 00:43:21.640
 I respect the fact that you all were able to come and speak tonight, fully understand

00:43:21.640 --> 00:43:29.560
 the reasoning for supporting this project, however, just because we have a good project

00:43:29.560 --> 00:43:34.720
 lined up at this current moment doesn't mean that that's going to be the project that goes

00:43:34.720 --> 00:43:38.960
 onto this property in the future.

00:43:38.960 --> 00:43:44.600
 I am hesitant to rezone this area light industrial with that fact in mind.

00:43:44.600 --> 00:43:47.320
 We don't control what is built there.

00:43:47.320 --> 00:43:53.280
 All we can control is the zoning of the land and with the single family development right

00:43:53.280 --> 00:44:00.360
 across the street, with more folks moving into this area, I am just not willing to say,

00:44:00.360 --> 00:44:08.000
 you know what, let's make their quality of life worse by putting in more light industrial

00:44:08.000 --> 00:44:10.460
 right across the way from them.

00:44:10.460 --> 00:44:14.920
 So I'm once again voting against this project and yeah.

00:44:14.920 --> 00:44:17.320
 Thank you.

00:44:17.320 --> 00:44:20.080
 Any other discussion before we vote?

00:44:20.080 --> 00:44:28.120
 Okay, I'll just add kind of what I said last time we heard this, you know, this area many

00:44:28.120 --> 00:44:33.120
 years ago, I stated this, needed some kind of a small area plan and to really decide

00:44:33.120 --> 00:44:38.760
 what we wanted this to become and grow and we didn't do that as a city, unfortunately.

00:44:38.760 --> 00:44:45.480
 So development kind of took place and it kind of made its way in light industrial.

00:44:45.480 --> 00:44:50.680
 So well, I don't love that fact if we just take what's in front of us today with this

00:44:50.680 --> 00:44:52.720
 particular site.

00:44:52.720 --> 00:44:59.360
 As Commissioner Smith mentioned, we rezone the front of this property, L.I., the back

00:44:59.360 --> 00:45:05.760
 of this property that we are looking at tonight is encumbered greatly by the environmentally

00:45:05.760 --> 00:45:12.240
 sensitive area on the east side of it.

00:45:12.240 --> 00:45:19.460
 The request as it is tonight makes sense for this particular piece of property.

00:45:19.460 --> 00:45:24.400
 So I will say that if there's any other discussion and if not, let's go ahead and vote on the

00:45:24.400 --> 00:45:36.240
 board.

00:45:36.240 --> 00:45:44.440
 That motion will carry four, three.

00:45:44.440 --> 00:45:53.040
 That will move us to item 3B tonight, that's PP23-0004 and I believe Cameron is coming

00:45:53.040 --> 00:45:55.340
 up for presentation of that item.

00:45:55.340 --> 00:45:57.000
 Good evening.

00:45:57.000 --> 00:46:06.080
 Good evening Chair and Commissioners, Cameron Robertson, principal planner.

00:46:06.080 --> 00:46:09.640
 So this is PP23-0004.

00:46:09.640 --> 00:46:16.400
 This is a preliminary plot for Denton Logistics Center located along FM 1173, just east of

00:46:16.400 --> 00:46:19.160
 the railroad line right there.

00:46:19.160 --> 00:46:23.320
 Staff is recommending denial of the plot as it does not meet the criteria for approval,

00:46:23.320 --> 00:46:28.320
 but staff has no objection to the request and extension to March 29th.

00:46:28.320 --> 00:46:29.320
 Any questions?

00:46:29.320 --> 00:46:30.320
 Thank you, Cameron.

00:46:30.320 --> 00:46:31.320
 Any questions for Cameron?

00:46:31.320 --> 00:46:32.320
 I do not see any.

00:46:32.320 --> 00:46:33.320
 Thank you so much.

00:46:33.320 --> 00:46:34.320
 Commissioner Villarreal.

00:46:34.320 --> 00:46:36.320
 I move approval of the extension to the date certain of March 29th, 2023.

00:46:36.320 --> 00:46:37.320
 Commissioner Smith?

00:46:37.320 --> 00:46:38.320
 Second.

00:46:38.320 --> 00:46:39.320
 Okay.

00:46:39.320 --> 00:46:48.440
 We've got a first and a second to approve the extension request to a date certain of

00:46:48.440 --> 00:46:51.040
 March 29th, 2023.

00:46:51.040 --> 00:46:53.360
 Any discussion?

00:46:53.360 --> 00:47:02.120
 Let's vote on the board, please.

00:47:02.120 --> 00:47:04.200
 That motion carries 7-0.

00:47:04.200 --> 00:47:06.760
 That will take us to 3C.

00:47:06.760 --> 00:47:07.760
 That's FR23-0002.

00:47:07.760 --> 00:47:08.760
 Hello, Sean.

00:47:08.760 --> 00:47:09.760
 Good evening Chair.

00:47:09.760 --> 00:47:10.760
 Members of the commission, Sean Jacobson, associate planner.

00:47:10.760 --> 00:47:19.040
 I'm just pulling up my item here.

00:47:19.040 --> 00:47:23.120
 All right.

00:47:23.120 --> 00:47:29.080
 Presenting FR23-0002, a replat of the mid-state's realty addition.

00:47:29.080 --> 00:47:35.080
 This is an approximately five-acre property just off Loop 288 north of the intersection

00:47:35.080 --> 00:47:37.960
 of Loop 288 and Spencer.

00:47:37.960 --> 00:47:43.160
 And right now, it does not meet our criteria for approval, so staff is recommending denial.

00:47:43.160 --> 00:47:47.240
 But staff does not object to the request at extension, which could be granted to a date

00:47:47.240 --> 00:47:49.040
 certain of March 29th.

00:47:49.040 --> 00:47:52.280
 With that, happy to answer any questions.

00:47:52.280 --> 00:47:53.280
 Thank you, Sean.

00:47:53.280 --> 00:47:54.280
 Any questions?

00:47:54.280 --> 00:47:57.160
 I do not see any, sir.

00:47:57.160 --> 00:47:58.160
 Thank you.

00:47:58.160 --> 00:47:59.160
 Commissioner Anderson?

00:47:59.160 --> 00:48:04.640
 I make a motion to approve the extension to date certain of March 29th.

00:48:04.640 --> 00:48:05.640
 Commissioner Villarreal?

00:48:05.640 --> 00:48:06.640
 Second.

00:48:06.640 --> 00:48:09.280
 Commissioner Villarreal has got a first and a second to approve the extension request

00:48:09.280 --> 00:48:14.880
 to a date certain of March 29th, 2023.

00:48:14.880 --> 00:48:23.920
 Seeing no discussion, let's go ahead and vote, please.

00:48:23.920 --> 00:48:26.520
 That motion carries 7-0.

00:48:26.520 --> 00:48:32.920
 That will take us to 3-D, PD 22-0010B.

00:48:32.920 --> 00:48:37.040
 Before I invite Mia up for this item, I'm just going to read a statement.

00:48:37.040 --> 00:48:41.120
 We've had a lot of comments through our online system on this, so I just want to make sure

00:48:41.120 --> 00:48:45.560
 people understand what it is we are reviewing tonight.

00:48:45.560 --> 00:48:50.640
 So the agenda posting for tonight is a motion to reconsider the vote that we made February

00:48:50.640 --> 00:48:57.360
 15th, 2023, on a requested rezoning of a PD overlay for property at the intersection

00:48:57.360 --> 00:49:00.560
 of Hunters Creek and Teasley Lane.

00:49:00.560 --> 00:49:05.920
 As the public hearing was closed and the item was voted on at that February 15th meeting,

00:49:05.920 --> 00:49:10.520
 the commission is not able to discuss and deliberate the actual rezoning request at

00:49:10.520 --> 00:49:15.280
 this meeting because the commission does not have legal authority to do so.

00:49:15.280 --> 00:49:21.480
 The commission is only able to discuss whether or not the requested rezoning should be reconsidered

00:49:21.480 --> 00:49:22.480
 at a future date.

00:49:22.480 --> 00:49:26.560
 So in other words, the commission is only able to discuss tonight whether or not they

00:49:26.560 --> 00:49:31.040
 want to have a second attempt at this item.

00:49:31.040 --> 00:49:34.880
 If the commission votes to reconsider the zoning case, the public hearing will be scheduled

00:49:34.880 --> 00:49:42.960
 for March 29th, 2023, of which then public comment related to it can be discussed at

00:49:42.960 --> 00:49:44.360
 that time.

00:49:44.360 --> 00:49:49.240
 If the commission votes to not reconsider the zoning case, then the zoning case will

00:49:49.240 --> 00:49:52.120
 move forward as a denial to city council.

00:49:52.120 --> 00:49:59.400
 They will hear it on March 7th and they would need a super majority in that case.

00:49:59.400 --> 00:50:05.200
 So with that statement read, I will go ahead and invite Mia up for a little brief overview

00:50:05.200 --> 00:50:08.200
 of what we're discussing.

00:50:08.200 --> 00:50:14.800
 Hi, good evening, commission, Mia Hines, associate planner.

00:50:14.800 --> 00:50:15.800
 I don't have much to add.

00:50:15.800 --> 00:50:24.240
 I was just going to talk through the what ifs, what would happen if you do decide to

00:50:24.240 --> 00:50:25.240
 reconsider.

00:50:25.240 --> 00:50:30.760
 So if you decide to reconsider this item this evening, we would re-notice it for a public

00:50:30.760 --> 00:50:32.920
 hearing on March 29th.

00:50:32.920 --> 00:50:38.760
 If not, then it will move forward to the March 7th, 2023 city council meeting with a recommendation

00:50:38.760 --> 00:50:44.600
 of denial and require a super majority vote and I'll answer any questions that you have.

00:50:44.600 --> 00:50:46.040
 Any questions for Mia?

00:50:46.040 --> 00:50:50.400
 Thanks, Mia, I don't see any.

00:50:50.400 --> 00:50:56.320
 So I'm going to go ahead and motion for the reconsideration and I will state that I believe

00:50:56.320 --> 00:51:02.640
 some things when we heard it originally were just not super clear, at least to me, when

00:51:02.640 --> 00:51:12.400
 we were discussing the item, namely that we've got NRMEU uses with MN development standards.

00:51:12.400 --> 00:51:17.480
 After further researching what that actually means, it means we have a really messy and

00:51:17.480 --> 00:51:26.000
 complicated development happening and so after studying further the backup, after visiting

00:51:26.000 --> 00:51:31.240
 the site multiple times, I just felt that it was necessary for us to have further discussion

00:51:31.240 --> 00:51:39.680
 on this item and that is why I would like this board to hear it again at another public

00:51:39.680 --> 00:51:40.680
 hearing.

00:51:40.680 --> 00:51:45.240
 So with that, I will move to reconsider this item.

00:51:45.240 --> 00:51:46.240
 Commissioner Anderson?

00:51:46.240 --> 00:51:47.240
 Second your motion.

00:51:47.240 --> 00:51:48.240
 Okay.

00:51:48.240 --> 00:51:50.880
 We've got a first and a second for the reconsideration.

00:51:50.880 --> 00:51:53.880
 Is there any discussion?

00:51:53.880 --> 00:51:54.880
 Commissioner Villarreal?

00:51:54.880 --> 00:51:55.880
 Yes.

00:51:55.880 --> 00:52:00.680
 I fully appreciate your explanation as to why you're requesting the reconsideration.

00:52:00.680 --> 00:52:04.200
 At this time, I don't believe there is a need for a reconsideration.

00:52:04.200 --> 00:52:10.400
 I believe everything was discussed as needed, the backup had enough material for us to do

00:52:10.400 --> 00:52:15.400
 our own research and with that in mind, I'm going to vote no against this motion.

00:52:15.400 --> 00:52:16.400
 Okay.

00:52:16.400 --> 00:52:23.160
 Well, and I feel like some of our discussion was perhaps just that we didn't have all the

00:52:23.160 --> 00:52:28.680
 facts, that we were not discussing all the facts correctly, so that's the biggest reason

00:52:28.680 --> 00:52:34.840
 why I want to have all of us have that discussion again, but I appreciate your thoughts.

00:52:34.840 --> 00:52:35.840
 Commissioner Pruitt?

00:52:35.840 --> 00:52:36.840
 Thank you, Chair.

00:52:36.840 --> 00:52:44.640
 I guess if you could provide more details about the facts that you feel like you've

00:52:44.640 --> 00:52:49.120
 learned, is it just the uses and the development standards?

00:52:49.120 --> 00:52:50.120
 Was it a specific use?

00:52:50.120 --> 00:52:51.120
 Yeah.

00:52:51.120 --> 00:52:52.120
 That is correct.

00:52:52.120 --> 00:52:55.480
 That is the most glaring thing to me that I don't think we were discussing correctly,

00:52:55.480 --> 00:53:02.560
 or at least I was not, with some of the thoughts that I had, because I don't, I thought that

00:53:02.560 --> 00:53:06.000
 we were truly dealing with PDMN, and we're really not.

00:53:06.000 --> 00:53:14.000
 We're dealing with PDMN, but only in MN development standards, and that changed, that for whatever

00:53:14.000 --> 00:53:19.680
 reason was not very clear in my head, and it became clear after the fact.

00:53:19.680 --> 00:53:26.640
 So that's why I would like to have further discussion of what the applicant is proposing,

00:53:26.640 --> 00:53:32.040
 and I just would like to reopen that so we can have thoughtful discussion again.

00:53:32.040 --> 00:53:33.040
 Okay.

00:53:33.040 --> 00:53:34.160
 Thank you.

00:53:34.160 --> 00:53:41.360
 I think in light of the fact that we didn't have full attendance at that meeting, and

00:53:41.360 --> 00:53:53.480
 the fact that I think we can come to unpack some of the concerns that we voiced, and staff,

00:53:53.480 --> 00:53:58.080
 I think, is great at understanding those and finding resolutions to those things.

00:53:58.080 --> 00:54:01.840
 I'm willing to have the conversation again.

00:54:01.840 --> 00:54:07.080
 I'll couch that with, in general, I don't like our reconsideration process in the sense

00:54:07.080 --> 00:54:12.720
 that if overused, it can be muddy.

00:54:12.720 --> 00:54:16.400
 So this is not something I take lightly.

00:54:16.400 --> 00:54:22.360
 And I would agree with you, and in my six-plus years sitting here, this is the first reconsideration

00:54:22.360 --> 00:54:25.100
 item that I have ever requested.

00:54:25.100 --> 00:54:31.400
 And also to your point, Commissioner Smith was absent at that meeting, and I think his

00:54:31.400 --> 00:54:38.360
 thoughts as the season commissioner that he is would certainly be welcome in that discussion.

00:54:38.360 --> 00:54:40.720
 Any other discussion?

00:54:40.720 --> 00:54:42.240
 Okay.

00:54:42.240 --> 00:54:52.920
 With that, let's go ahead and vote on the board.

00:54:52.920 --> 00:54:58.720
 That motion will carry 6-1, so that will be on a future agenda public hearing item.

00:54:58.720 --> 00:54:59.840
 Thank you.

00:54:59.840 --> 00:55:06.800
 That will move us to our public hearing item for this evening, and that is 4A-Z23-0001.

00:55:06.800 --> 00:55:13.000
 I will open the public hearing and invite Mia up for presentation.

00:55:13.000 --> 00:55:17.640
 Excuse me.

00:55:17.640 --> 00:55:28.320
 Good evening again, Chair, members of the commission, Mia Hines, Associate Planner.

00:55:28.320 --> 00:55:36.240
 This item, Z23-0001, is a request to rezone approximately 30 acres from Plan Development

00:55:36.240 --> 00:55:41.760
 120 to the mixed-use neighborhood district under our current debt and development code.

00:55:41.760 --> 00:55:47.000
 The site itself is generally located just south of Loop 288, approximately 1,600 feet

00:55:47.000 --> 00:55:56.520
 west of North Locust Street, and directly adjacent to Beale Street, surrounding the

00:55:56.520 --> 00:56:02.560
 property to the south and to the west are single-family residential developments currently

00:56:02.560 --> 00:56:04.160
 under construction.

00:56:04.160 --> 00:56:11.440
 They were also originally a part of the PD-120, but have since been rezoned to R6 to the south

00:56:11.440 --> 00:56:13.880
 and R4 to the southwest.

00:56:13.880 --> 00:56:18.840
 To the east of the subject property is an existing multifamily development currently

00:56:18.840 --> 00:56:24.360
 zoned within the existing PD-120, and then to the north on the opposite side of Loop

00:56:24.360 --> 00:56:30.360
 288 is the Hills of Denton Master Plan community, currently undeveloped, but the planned land

00:56:30.360 --> 00:56:36.040
 use for that area is some type of commercial land use within that Master Plan community.

00:56:36.040 --> 00:56:40.200
 The future land use map designation for this site is moderate residential per the Denton

00:56:40.200 --> 00:56:44.400
 2040 Comprehensive Plan, and the site itself is currently undeveloped.

00:56:44.400 --> 00:56:48.760
 Just to provide you with a little background information, the existing zoning PD-120 was

00:56:48.760 --> 00:56:54.520
 established in 1986, and the land use that was conceptually planned for this site was

00:56:54.520 --> 00:56:59.880
 multifamily and multifamily restricted, which at that time is similar to what we have as

00:56:59.880 --> 00:57:03.380
 townhomes, or what we call townhome these days.

00:57:03.380 --> 00:57:11.900
 The base zoning for that district was the MF1, and that is per the 1969 zoning ordinance,

00:57:11.900 --> 00:57:14.040
 and so that was the original establishment of this PD.

00:57:14.040 --> 00:57:20.240
 That PD was later amended in 1998, and the conceptual land use was still multifamily

00:57:20.240 --> 00:57:21.700
 for this site.

00:57:21.700 --> 00:57:25.920
 They removed the fact that some of it had to be that multifamily restricted townhome

00:57:25.920 --> 00:57:29.240
 element, and so it was just multifamily permitted on this site.

00:57:29.240 --> 00:57:36.400
 Additionally, they added a cap of density at 18 units per acre and a total of 800 total

00:57:36.400 --> 00:57:42.200
 units for both this site and the existing multifamily site that is there to the east

00:57:42.200 --> 00:57:45.120
 that was developed in 2010.

00:57:45.120 --> 00:57:52.160
 That ordinance in 2010 came just before the development of that multifamily project, and

00:57:52.160 --> 00:57:56.440
 it basically cleaned some stuff up, but even if you look at the detailed plan that was

00:57:56.440 --> 00:58:00.520
 established for that development, it's still sort of unclear because we were pulling from

00:58:00.520 --> 00:58:05.640
 1969 standards and 2002 didn't development code standards.

00:58:05.640 --> 00:58:10.360
 There's a lot going on with this history of this site, and ultimately this particular

00:58:10.360 --> 00:58:15.480
 zoning case would remove the subject site from this PD and allow it to adhere to our

00:58:15.480 --> 00:58:20.040
 existing mixed-use neighborhood development standards.

00:58:20.040 --> 00:58:26.520
 Just a quick comparison, the PD 120 MF1 and the 1969 development code were silent to a

00:58:26.520 --> 00:58:28.320
 lot of the things that we currently regulate.

00:58:28.320 --> 00:58:31.880
 Just wanted to show you a side-by-side comparison of some of those things.

00:58:31.880 --> 00:58:37.560
 For example, we have currently in our MN district, we require a minimum of 20% landscape area

00:58:37.560 --> 00:58:45.080
 coverage, 40% tree canopy coverage, and one street tree per 45 feet of street frontage,

00:58:45.080 --> 00:58:51.600
 and none of that was mentioned in the existing or under the existing PD.

00:58:51.600 --> 00:58:58.200
 Additionally, there are some arbitrary maximum building height requirements, and the permitted

00:58:58.200 --> 00:59:03.800
 use for the site is multifamily only, whereas, of course, if this were rezoned to MN, it

00:59:03.800 --> 00:59:08.920
 would open it up to multifamily as well, but also some of those commercial uses that are

00:59:08.920 --> 00:59:13.240
 appropriate for the mixed-use neighborhood setting.

00:59:13.240 --> 00:59:17.920
 We did review this request up against the criteria for approval in subchapter two.

00:59:17.920 --> 00:59:23.000
 Specifically, the MN zoning is consistent with the Denton 2040 comprehensive plans future

00:59:23.000 --> 00:59:28.560
 land use map designation of moderate residential, as it would allow for the development of residential

00:59:28.560 --> 00:59:31.560
 dwellings of various density and scale.

00:59:31.560 --> 00:59:36.280
 Additionally, that MN zoning is intended to support compatibility between higher-intensity

00:59:36.280 --> 00:59:42.320
 mixed uses and adjacent residential, which we would have here, the higher-intensity mixed

00:59:42.320 --> 00:59:49.360
 uses being the multifamily to the east commercial across loop 288 and then loop 288 itself,

00:59:49.360 --> 00:59:54.240
 and then the lower intense would be the single-family to the south and to the west that's currently

00:59:54.240 --> 00:59:55.920
 being developed.

00:59:55.920 --> 00:59:59.720
 Under the current zoning, applicable development standards are a bit unclear.

00:59:59.720 --> 01:00:05.280
 We have that sort of history that I just went through, and by this going from a PD to the

01:00:05.280 --> 01:00:09.960
 MN standards, this would allow staff to enforce those standards of our current Denton development

01:00:09.960 --> 01:00:10.960
 code.

01:00:10.960 --> 01:00:16.640
 So, we did perform public outreach per our requirements and state requirement.

01:00:16.640 --> 01:00:20.120
 As of the time of this report and the preparation of this presentation, I had not yet received

01:00:20.120 --> 01:00:21.240
 a response.

01:00:21.240 --> 01:00:25.800
 Late this afternoon, I did receive one response in support of the request from a property

01:00:25.800 --> 01:00:30.720
 owner along Bill Street, and so we will make sure that that map is updated, of course,

01:00:30.720 --> 01:00:32.200
 as we move forward.

01:00:32.200 --> 01:00:37.120
 But other than that, no other contacts, no other inquiries about this project that I've

01:00:37.120 --> 01:00:38.120
 received.

01:00:38.120 --> 01:00:43.080
 The applicant did schedule two virtual neighborhood meetings that they ended up canceling because

01:00:43.080 --> 01:00:49.000
 they had not received an RSVP from anyone in the community, and the applicant is here

01:00:49.000 --> 01:00:51.920
 if you have any questions for them about those efforts as well.

01:00:51.920 --> 01:00:56.280
 So with that, staff is recommending approval of the requested rezoning as it meets the

01:00:56.280 --> 01:01:01.400
 criteria as I've described, and the next steps for this case would be a public hearing

01:01:01.400 --> 01:01:05.240
 at City Council with this body's recommendation.

01:01:05.240 --> 01:01:07.800
 With that, I will take any questions you have at this time.

01:01:07.800 --> 01:01:08.800
 Awesome.

01:01:08.800 --> 01:01:10.080
 Thank you, Mia, very much.

01:01:10.080 --> 01:01:13.880
 Any questions for me at this time?

01:01:13.880 --> 01:01:14.880
 I do not...

01:01:14.880 --> 01:01:15.880
 Oh, yes, I do.

01:01:15.880 --> 01:01:16.880
 Commissioner Pruitt.

01:01:16.880 --> 01:01:17.880
 Thank you, Chair.

01:01:17.880 --> 01:01:20.780
 Sorry, I had a slow draw on this monitor.

01:01:20.780 --> 01:01:26.880
 Just one question, make sure I understand the connectivity development requirements for

01:01:26.880 --> 01:01:31.360
 the MN zone and compatibility to the neighborhood.

01:01:31.360 --> 01:01:36.400
 On the southeast portion of this property, it appears to border City of Denton right

01:01:36.400 --> 01:01:43.800
 away in the vicinity of the intersection between Beale and Abrams.

01:01:43.800 --> 01:01:50.280
 Are there any developments, and if so, what types of uses or that sort of thing where

01:01:50.280 --> 01:01:53.920
 connectivity to that intersection would not be provided?

01:01:53.920 --> 01:01:58.360
 Sorry, maybe I'm phrasing it.

01:01:58.360 --> 01:02:04.260
 I'm trying to understand what types of uses, and if the answer is none, that's fine too.

01:02:04.260 --> 01:02:09.040
 Would connectivity to that current three-way intersection not be required of the developer?

01:02:09.040 --> 01:02:10.040
 Not be required?

01:02:10.040 --> 01:02:11.040
 Yeah.

01:02:11.040 --> 01:02:18.280
 Well, I think the development would have to have two points of access, so it will pull

01:02:18.280 --> 01:02:28.240
 from that street either extending Abram up into the development or just making a direct

01:02:28.240 --> 01:02:31.640
 access and a private drive or something along those lines, and then the other connection

01:02:31.640 --> 01:02:36.280
 would be the service road to loop 288 on the north side of the property.

01:02:36.280 --> 01:02:38.720
 Off the top of my head, I think just to answer your question, off the top of my head, I can't

01:02:38.720 --> 01:02:43.560
 think of any uses that wouldn't be required to...

01:02:43.560 --> 01:02:45.780
 Within the MN district that wouldn't be required to...

01:02:45.780 --> 01:02:50.520
 To have that access to the southeast corner, okay, thank you.

01:02:50.520 --> 01:02:53.800
 Thanks, Mia.

01:02:53.800 --> 01:02:56.640
 I do not see any other questions at this time, thank you.

01:02:56.640 --> 01:03:01.120
 I do have a card in front of me, and it is the applicant, I believe, so I will invite

01:03:01.120 --> 01:03:02.920
 Amy Bissett up for the podium.

01:03:02.920 --> 01:03:03.920
 Hello.

01:03:03.920 --> 01:03:08.520
 Thank you, Amy Bissett, 109 North Elm, Denton 76201.

01:03:08.520 --> 01:03:12.560
 I brought a brief presentation, but I'm not going to make it unless you ask me to.

01:03:12.560 --> 01:03:15.440
 I'm just going to provide a couple of points of clarification.

01:03:15.440 --> 01:03:22.160
 I will say that I have done a PD amendment in the 1969 code before, you all might remember

01:03:22.160 --> 01:03:23.160
 it.

01:03:23.160 --> 01:03:28.080
 It was in the Stonehill shopping center up off of loop 288 and 35.

01:03:28.080 --> 01:03:33.120
 It was a nightmare to try to, one, understand the requirements, and two, comply with them,

01:03:33.120 --> 01:03:38.920
 because even the definitions didn't exist for some of the requirements that were there.

01:03:38.920 --> 01:03:44.320
 Certainly bringing this into the current code is the more logical choice.

01:03:44.320 --> 01:03:50.240
 On an aside, I listened to the work session and you all's discussion on environmentally

01:03:50.240 --> 01:03:55.260
 sensitive areas, and we did do an ESA field assessment on this site.

01:03:55.260 --> 01:04:01.440
 No ESAs were shown on the map, on the existing map, but we did one just to confirm, and there

01:04:01.440 --> 01:04:02.440
 are none.

01:04:02.440 --> 01:04:04.840
 However, there is a drainage easement.

01:04:04.840 --> 01:04:10.960
 There is quite a bit of quality protected trees, and coming into the new code will require

01:04:10.960 --> 01:04:14.080
 us to meet those preservation requirements.

01:04:14.080 --> 01:04:20.760
 On the neighborhood engagement side of things, the single family homes that are along Beale

01:04:20.760 --> 01:04:26.960
 today, they're under construction or have just finished construction, and the notification

01:04:26.960 --> 01:04:32.480
 lists that we were provided by the city didn't have any utility addresses associated with

01:04:32.480 --> 01:04:36.840
 any of those, but I went out and drove it and confirmed that people actually occupied

01:04:36.840 --> 01:04:41.720
 those homes, so we went and pulled all of the addresses on both sides of Beale that

01:04:41.720 --> 01:04:46.360
 came close to the development, just to cover our bases and make sure that anybody that

01:04:46.360 --> 01:04:52.320
 had actually moved into their home was notified ahead of time, and we just didn't have any

01:04:52.320 --> 01:04:58.920
 response whatsoever from anyone, even asking questions about the proposed development.

01:04:58.920 --> 01:05:04.760
 We try to be sensitive to that, especially when it's multi-family, abutting single family

01:05:04.760 --> 01:05:09.720
 and people's backyards, and we'll continue to be sensitive to that as we move through

01:05:09.720 --> 01:05:14.880
 the development process, assuming the zoning gets approved.

01:05:14.880 --> 01:05:18.160
 Commissioner Pruitt, to your question about the concept plan and connectivity, I'm happy

01:05:18.160 --> 01:05:22.720
 to show you the concept plan, if you would like, but we do plan to connect through to

01:05:22.720 --> 01:05:29.240
 Locust as well as will be required to construct service lanes along Loop 288 to provide connectivity

01:05:29.240 --> 01:05:30.240
 there.

01:05:30.240 --> 01:05:33.160
 I'm happy to answer any questions that you have.

01:05:33.160 --> 01:05:34.160
 Thank you.

01:05:34.160 --> 01:05:35.160
 Thank you, Amy.

01:05:35.160 --> 01:05:36.160
 Commissioner Smith.

01:05:36.160 --> 01:05:37.160
 Thank you, Chair.

01:05:37.160 --> 01:05:39.720
 And this might be more of a Mia question as well.

01:05:39.720 --> 01:05:45.040
 Is that area where Beale and all that neighborhood south of you, is that an HOA, or is that HOA

01:05:45.040 --> 01:05:48.440
 controlled by any way?

01:05:48.440 --> 01:05:54.760
 I don't want to misstate here, but we typically look for HOA evidence when we start neighborhood

01:05:54.760 --> 01:05:58.200
 engagement and could not find any on that site.

01:05:58.200 --> 01:06:00.200
 The builder is still constructing.

01:06:00.200 --> 01:06:01.200
 Who is the builder?

01:06:01.200 --> 01:06:03.760
 I believe that it's Jim Strange.

01:06:03.760 --> 01:06:04.760
 Have you talked to Jim?

01:06:04.760 --> 01:06:08.440
 I have not spoken with him directly, but I'd be happy to give him a call.

01:06:08.440 --> 01:06:12.960
 I think it'd just be good because I could just, and this is more of just a look into

01:06:12.960 --> 01:06:19.160
 the future and having seen this problem before, site gets rezoned.

01:06:19.160 --> 01:06:23.440
 The zoning sits maybe for longer than expected, you know, change of hands or whatever it is,

01:06:23.440 --> 01:06:30.320
 but somebody comes in and submits a preliminary plot and somehow one way or another, a bunch

01:06:30.320 --> 01:06:34.160
 of neighborhood citizens, even though they get notified of a preliminary plot, they find

01:06:34.160 --> 01:06:37.160
 out that that's coming.

01:06:37.160 --> 01:06:41.360
 And then there's an uproar afterwards because a lot of times they get told, yes, you should

01:06:41.360 --> 01:06:42.360
 buy a house here.

01:06:42.360 --> 01:06:45.280
 That vacant lot behind you is going to stay vacant for many, many years.

01:06:45.280 --> 01:06:50.840
 So I don't know, I mean, if this gets approved and moves forward, I don't know what you as

01:06:50.840 --> 01:06:56.760
 the developer or if this, after this gets zoned, if your client or whoever it is is

01:06:56.760 --> 01:07:00.640
 going to take it and move that on to somebody else who's going to develop it, but probably

01:07:00.640 --> 01:07:04.680
 this should be something that is a conversation with the builder, make sure the builder knows

01:07:04.680 --> 01:07:08.240
 that as people are buying it, that yes, this has been rezoned and there is a development

01:07:08.240 --> 01:07:12.160
 coming and that if there is a concept for what that development will be, that it's

01:07:12.160 --> 01:07:16.200
 aware, just so that basically to save the future version of the commission a little

01:07:16.200 --> 01:07:18.840
 bit of heartache because we start talking to people there in a preliminary plot saying

01:07:18.840 --> 01:07:23.080
 that we can't do anything about it because we're ministerial at this point in time.

01:07:23.080 --> 01:07:25.600
 We're just sad that somebody told you something wrong back then.

01:07:25.600 --> 01:07:30.760
 Well, and I hope to be on that project still when it comes back with preliminary plat and

01:07:30.760 --> 01:07:32.160
 it would save me the heartache as well.

01:07:32.160 --> 01:07:33.160
 Cool.

01:07:33.160 --> 01:07:34.160
 Awesome.

01:07:34.160 --> 01:07:35.160
 Thank you, Amy.

01:07:35.160 --> 01:07:36.160
 Absolutely.

01:07:36.160 --> 01:07:37.160
 Thank you.

01:07:37.160 --> 01:07:38.160
 Thanks, Commissioner Smith.

01:07:38.160 --> 01:07:39.160
 Any other questions?

01:07:39.160 --> 01:07:40.160
 Thank you.

01:07:40.160 --> 01:07:41.160
 Thank you.

01:07:41.160 --> 01:07:42.160
 Okay.

01:07:42.160 --> 01:07:43.160
 This is a public hearing.

01:07:43.160 --> 01:07:46.080
 I don't have any other cards in front of me, but is there anyone else wishing to speak

01:07:46.080 --> 01:07:48.520
 on this item?

01:07:48.520 --> 01:07:50.720
 Okay.

01:07:50.720 --> 01:07:55.480
 Seeing none, I will go ahead and close the public hearing and open the floor for a moment.

01:07:55.480 --> 01:07:58.000
 Make a motion or discussion.

01:07:58.000 --> 01:07:59.000
 Commissioner Smith?

01:07:59.000 --> 01:08:01.440
 Make a motion to approve as presented.

01:08:01.440 --> 01:08:02.440
 Commissioner McDade?

01:08:02.440 --> 01:08:03.440
 Second.

01:08:03.440 --> 01:08:04.440
 Okay.

01:08:04.440 --> 01:08:06.480
 We've got a first and a second for approval of the request.

01:08:06.480 --> 01:08:07.720
 Any discussion?

01:08:07.720 --> 01:08:08.720
 Okay.

01:08:08.720 --> 01:08:16.080
 I'll just say that I think it'll be great to bring this into 2023 and deal with today's

01:08:16.080 --> 01:08:17.080
 code.

01:08:17.080 --> 01:08:20.920
 So I think that's a definite win.

01:08:20.920 --> 01:08:22.200
 I don't see any other discussion.

01:08:22.200 --> 01:08:30.360
 Let's go ahead and vote, please.

01:08:30.360 --> 01:08:32.720
 That motion carries 7-0.

01:08:32.720 --> 01:08:36.920
 That will take us to our Planning and Zoning Commission project matrix, and I will turn

01:08:36.920 --> 01:08:39.280
 the floor over to Tina.

01:08:39.280 --> 01:08:41.400
 Thank you, Chair Ellis.

01:08:41.400 --> 01:08:45.760
 With respect to, I know I typically give you a report on recent City Council action on

01:08:45.760 --> 01:08:50.920
 development projects, so since the last time the commission has met, the City Council meeting

01:08:50.920 --> 01:08:56.320
 on February 21st, we really only had one item on that agenda, and that was actually contract

01:08:56.320 --> 01:09:01.720
 for approval for the Southeast Denton area plan consultant.

01:09:01.720 --> 01:09:05.740
 So happy to report that the contract has been approved.

01:09:05.740 --> 01:09:08.600
 So the city has retained HDR.

01:09:08.600 --> 01:09:13.600
 If that sounds familiar, HDR is also working with us on Northeast Denton.

01:09:13.600 --> 01:09:18.760
 However, the entire team is not the same, so the project manager built a team to make

01:09:18.760 --> 01:09:23.680
 sure that it was appropriate for Southeast Denton to bring people with strengths for

01:09:23.680 --> 01:09:28.400
 some of the challenges and opportunities that we'll be working on for Southeast Denton,

01:09:28.400 --> 01:09:30.420
 and so that contract was approved.

01:09:30.420 --> 01:09:35.600
 We will be working on kicking off that project formally in March.

01:09:35.600 --> 01:09:41.640
 There will be robust public engagement associated with that project, and so we anticipate some

01:09:41.640 --> 01:09:45.760
 public engagement activities happening early in April, but we'll definitely keep the commission

01:09:45.760 --> 01:09:47.880
 informed as we work on that project.

01:09:47.880 --> 01:09:54.120
 You all will have a role in that project as well, and so know that we will be starting

01:09:54.120 --> 01:09:55.680
 on those efforts as well.

01:09:55.680 --> 01:10:01.020
 So that's the only item to report from Council's February 21st agenda.

01:10:01.020 --> 01:10:03.840
 We do not have any development cases on that agenda.

01:10:03.840 --> 01:10:08.200
 And then with respect to the matrix, we have not made any changes to the matrix since it

01:10:08.200 --> 01:10:13.280
 was last presented two weeks ago, so happy to receive any additional requests if you

01:10:13.280 --> 01:10:14.280
 want anything added.

01:10:14.280 --> 01:10:15.280
 Great.

01:10:15.280 --> 01:10:16.340
 Thank you.

01:10:16.340 --> 01:10:19.240
 Anything to be added to the matrix?

01:10:19.240 --> 01:10:20.240
 Commissioner Pruitt?

01:10:20.240 --> 01:10:21.240
 Thank you, Chair.

01:10:21.240 --> 01:10:25.920
 I was hoping somebody else would say this, but I'll go for it.

01:10:25.920 --> 01:10:31.440
 As a much longer term thing, because I think it will be contingent on one of the items

01:10:31.440 --> 01:10:40.200
 that's already on our matrix from ... I think it was Chair, about some of the legislative

01:10:40.200 --> 01:10:46.560
 issues going on, we've had a lot of discussions about MUDs that that was almost, will be a

01:10:46.560 --> 01:10:51.840
 year and a half ago soon with the 2040 plan update.

01:10:51.840 --> 01:10:57.240
 And I just think once the current legislative session is over and we get a little bit more

01:10:57.240 --> 01:11:03.640
 clarity about what's happening in the ETJ on the western side of our city, it might

01:11:03.640 --> 01:11:10.200
 help us to give staff some clarity on the direction of P&Z, at least, to have a discussion

01:11:10.200 --> 01:11:14.640
 about what that side of the town looks like.

01:11:14.640 --> 01:11:18.400
 I'm not envisioning something that looks like another area plan yet.

01:11:18.400 --> 01:11:23.180
 It's just let's have a heart to heart, if that makes sense, once the legislative issues

01:11:23.180 --> 01:11:26.040
 get settled down.

01:11:26.040 --> 01:11:28.360
 Great.

01:11:28.360 --> 01:11:29.720
 Thank you.

01:11:29.720 --> 01:11:31.600
 Anything else for the matrix?

01:11:31.600 --> 01:11:34.960
 Okay, any concluding items?

01:11:34.960 --> 01:11:37.160
 Okay.

01:11:37.160 --> 01:11:38.160
 Thank you all.

01:11:38.160 --> 01:11:42.640
 And with that, I will adjourn us at 720 PM.