1 00:00:00,000 --> 00:00:07,000 >> Okay. It is 9 o'clock and we have a quorum so call to order the public utilities board 2 00:00:07,000 --> 00:00:14,680 for the City of Denton on Monday, February 27th, 2023. The first item is anybody from 3 00:00:14,680 --> 00:00:24,280 the public who wants to address the PUB board? Nope. Okay. Moving along. Consent agenda. 4 00:00:24,280 --> 00:00:30,600 Does any board member wish to pull an item A through D? Okay. Seeing none, do we have 5 00:00:30,600 --> 00:00:35,800 a motion to approve items A through D on the consent? 6 00:00:35,800 --> 00:00:37,160 >> Move approval. 7 00:00:37,160 --> 00:00:38,160 >> Second. 8 00:00:38,160 --> 00:00:40,520 >> Okay. All in favor say aye. 9 00:00:40,520 --> 00:00:41,520 >> Aye. 10 00:00:41,520 --> 00:00:48,720 >> All right. Consideration for approval of the February 13th, 2023 minutes. Do we have 11 00:00:48,720 --> 00:01:00,880 a motion to approve? Moves and a second? Okay. All in favor say aye. 12 00:01:00,880 --> 00:01:01,880 >> Aye. 13 00:01:01,880 --> 00:01:21,140 >> All right. The next item is PUB23046. 14 00:01:21,140 --> 00:01:24,880 >> All right. Good morning, Madam Chair, members of the board, Seth Garcia, program manager 15 00:01:24,880 --> 00:01:30,200 with capital projects. This morning I have a brief presentation for construction inspection 16 00:01:30,200 --> 00:01:37,240 services associated with the 2019 bond program. So for a quick little overview of the projects 17 00:01:37,240 --> 00:01:42,760 we're proposing for this bond program or for the inspection services, excuse me. So we 18 00:01:42,760 --> 00:01:48,120 have 14 projects within our street reconstruction. That's our neighborhood program. Roughly 10 19 00:01:48,120 --> 00:01:53,920 CSP projects and four CMAR projects. We're estimating it to be around $150 million in 20 00:01:53,920 --> 00:01:57,920 construction. And our goal is to complete all these neighborhood projects by the end 21 00:01:57,920 --> 00:02:03,460 of 2026. And on the right there you can see the different areas shaded and then the highlighted 22 00:02:03,460 --> 00:02:08,380 street segments associated with the street reconstruction of the bond program. The second 23 00:02:08,380 --> 00:02:13,640 main project we're proposing for these inspection services is Bonnie Bray Phase 6. So this is 24 00:02:13,640 --> 00:02:19,440 a local government-led project, which means we have FHWA or federal highway funds associated 25 00:02:19,440 --> 00:02:25,200 with the project. So it's a joint project with TxDOT. It is estimated to be 30 plus 26 00:02:25,200 --> 00:02:30,340 million in construction costs. And it is a two-year construction project. And for those 27 00:02:30,340 --> 00:02:35,000 who aren't familiar, Bonnie Bray Phase 6 is the section of two-lane and four-lane roadway 28 00:02:35,000 --> 00:02:41,480 right now in between US 380 and US 77. And we will be upgrading it to a four-lane divided 29 00:02:41,480 --> 00:02:50,240 roadway. So for the contract summary, you can see there our estimated cost for the street 30 00:02:50,240 --> 00:02:55,160 rehabilitation portion is just at $6 million. There's a little bit better breakdown in 31 00:02:55,160 --> 00:03:01,400 the AIS. And then for Bonnie Bray Phase 6, we've got a $2 million estimate on that. It 32 00:03:01,400 --> 00:03:06,120 will be funded through the 2019 bond funds and utility funds. And then as you can see 33 00:03:06,120 --> 00:03:11,680 there, Bonnie Bray Phase 6 does have those FHWA funds attached to it as well. For the 34 00:03:11,680 --> 00:03:17,640 summary of services, so we will expect construction inspection and full documentation from this 35 00:03:17,640 --> 00:03:23,560 firm. They will also be responsible for SW3P inspections to make sure they're in compliance 36 00:03:23,560 --> 00:03:29,340 with our watershed group as well. Pay application review, schedule review. Of course, public 37 00:03:29,340 --> 00:03:34,660 engagement for anybody who lives out there on the project sites. And then dispute support. 38 00:03:34,660 --> 00:03:39,920 And as you can see on Bonnie Bray Phase 6, we also will have some pretty intensive record 39 00:03:39,920 --> 00:03:47,160 keeping. TxDOT requires quite a few of their own forms to be filled out each month as well 40 00:03:47,160 --> 00:03:53,520 as the pay application to be done by the municipality and submitted for payment. So that is quite 41 00:03:53,520 --> 00:03:59,600 an effort. And so we will have a dedicated record keeper as well as multiple inspectors 42 00:03:59,600 --> 00:04:05,640 for that TxDOT procedure process. So in total, we're looking for just over an $8 million 43 00:04:05,640 --> 00:04:12,040 NTE. So with that, Steph recommends adoption of the ordinance with the City of Denton and 44 00:04:12,040 --> 00:04:17,920 consular engineers in the not to exceed amount of $8 million. And I'm happy to answer any 45 00:04:17,920 --> 00:04:18,920 questions. 46 00:04:18,920 --> 00:04:26,400 We've done projects like this before. I don't recall that we've ever hired someone to do 47 00:04:26,400 --> 00:04:30,120 inspections and things of this nature. What's different about this? 48 00:04:30,120 --> 00:04:34,600 Yes, ma'am. So right now the need is just the sheer volume of work that we're putting 49 00:04:34,600 --> 00:04:40,840 out. So right now we're going to have seven projects in construction. One of the larger 50 00:04:40,840 --> 00:04:47,000 projects that we brought forward was Southeast Denton Package B. It was $21 million over 51 00:04:47,000 --> 00:04:53,800 15 months. So that breaks down to a burn rate of about $1.3 million a month. And right now 52 00:04:53,800 --> 00:04:58,800 that contractor has eight crews working and we're taking down four streets at a time. 53 00:04:58,800 --> 00:05:04,080 So with that, our inspections group just doesn't have the capacity to handle the need right 54 00:05:04,080 --> 00:05:10,180 now. So by allowing us to use our pre-qualified construction inspection list, we can get them 55 00:05:10,180 --> 00:05:15,840 to focus on other CIP jobs as well as the development jobs and kind of sync up this 56 00:05:15,840 --> 00:05:20,160 firm with the bond program to give them some consistency with what we're needing. 57 00:05:20,160 --> 00:05:25,040 Would it be fair to say we're trying to double up and catch up? 58 00:05:25,040 --> 00:05:31,320 I would say yes, as well as provide the coverage needed just to support the city from a risk 59 00:05:31,320 --> 00:05:38,660 level, just to have people out there monitoring that it is being built to spec, watching testing 60 00:05:38,660 --> 00:05:42,720 being done. Of course, reviewing those pay applications and schedule. It's more of a 61 00:05:42,720 --> 00:05:45,960 protection on the city side to make sure we're not getting behind. 62 00:05:45,960 --> 00:05:53,520 Was there some reason to think that you needed this as was there some concern that things 63 00:05:53,520 --> 00:05:58,560 in the past maybe not have been done exactly as you wanted? 64 00:05:58,560 --> 00:06:03,280 There has always been that concern. And as well, I think this ties back more to staffing. 65 00:06:03,280 --> 00:06:08,760 So we actually pulled this firm from our pre-qualified list. So we pre-qualified five different firms 66 00:06:08,760 --> 00:06:13,560 and shortlisted them to do it. We saw this coming just with the amount of work that our 67 00:06:13,560 --> 00:06:18,080 group was pushing out for the bond program. It was simply just going to be too much for 68 00:06:18,080 --> 00:06:22,960 our internal inspections to handle. But yes, on the flip side of that as well, 69 00:06:22,960 --> 00:06:27,440 we have been burned by other contractors before and things not being built. So like I said, 70 00:06:27,440 --> 00:06:31,240 this provides more protection for the city to make sure we're getting what we're paying 71 00:06:31,240 --> 00:06:33,240 for out there. Thank you. 72 00:06:33,240 --> 00:06:39,160 Other questions? Yes, sir. 73 00:06:39,160 --> 00:06:47,520 Good morning. Just a couple of questions. Was this planned at the time of the 2019 bond 74 00:06:47,520 --> 00:06:52,760 or has this been realized as a necessity after the bond moved forward? 75 00:06:52,760 --> 00:06:58,360 So the original plan was we were going to use our internal staff as much as we could. 76 00:06:58,360 --> 00:07:03,760 We provided to council many supplementals to try and beef up our internal inspection 77 00:07:03,760 --> 00:07:09,840 staff and we were granted a few positions. So that has got us by through the first three 78 00:07:09,840 --> 00:07:15,280 projects for that program. So we've had three CSPs go out that our internal crews 79 00:07:15,280 --> 00:07:20,120 have inspected. But like I said, now with these CMAR, these larger projects going out 80 00:07:20,120 --> 00:07:26,560 to where we've really rung out all the efficiencies in the schedule, it's just become too much. 81 00:07:26,560 --> 00:07:31,720 So budget wise, we have planned for that in our budget. We've carried 3.5% through all 82 00:07:31,720 --> 00:07:37,040 of our projects for these construction inspections. When I did the rough breakout, it looks like 83 00:07:37,040 --> 00:07:42,880 with what the firm is proposing, we're going to be right around 3.8%. So we're just a 84 00:07:42,880 --> 00:07:49,160 hair higher. But that is, of course, if we hit our projection, we use all of that. They 85 00:07:49,160 --> 00:07:56,160 will only bill as hours used against these contracts. So hopefully by the time we get 86 00:07:56,160 --> 00:07:59,920 to the end of 2026, we will come in right at our budget. 87 00:07:59,920 --> 00:08:07,920 And then the winners of the CMAR and CSP contracts, they have their own QC processes and they're 88 00:08:07,920 --> 00:08:17,680 like in this case, if all goes well, CONSOR will just be routing, doing final inspections 89 00:08:17,680 --> 00:08:21,720 and routing the as-builts and so forth, right? 90 00:08:21,720 --> 00:08:26,640 Yeah, that's correct. So our specifications lay out some pretty stringent QC processes. 91 00:08:26,640 --> 00:08:32,400 So they are there to observe and report to either the project manager or in this case, 92 00:08:32,400 --> 00:08:36,720 the manager of the inspections department is kind of the route, the organizational chart 93 00:08:36,720 --> 00:08:41,680 that it will flow through before it comes to the project manager. But you're absolutely 94 00:08:41,680 --> 00:08:47,360 correct. It's to catch things that we can, but more just observation through that period. 95 00:08:47,360 --> 00:08:55,240 Any more questions? All right. Do we have a motion to approve? 96 00:08:55,240 --> 00:08:56,240 I move approval. 97 00:08:56,240 --> 00:09:02,800 I'll second. I'm going to have just a couple of comments. So this is obviously a critical 98 00:09:02,800 --> 00:09:09,800 component of any major project. Having QC and it's great to have a second firm or us, 99 00:09:09,800 --> 00:09:21,080 you know, the city QC, the construction teams. So that, you know, what is it? Trust but verify, 100 00:09:21,080 --> 00:09:24,400 right? Classic one-liner. 101 00:09:24,400 --> 00:09:29,560 And I just want to make sure that going forward, these are either, you know, when we issue 102 00:09:29,560 --> 00:09:35,400 bonds, the 2019 bond isn't unique. We every three to five years have a new bond project 103 00:09:35,400 --> 00:09:42,520 and do major infrastructure work in town. So either we move this in house, which requires 104 00:09:42,520 --> 00:09:51,320 permanent staffing, $8 million over a couple of years, probably higher 30 or 40 headcount. 105 00:09:51,320 --> 00:09:56,160 And I could see how that would seem like a massive expansion to city resources. But it 106 00:09:56,160 --> 00:10:02,400 might be more effective going forward than having contractors. Or if we're going to use 107 00:10:02,400 --> 00:10:10,640 contract labor as we go forward, then we just make sure that in the 2024 bond or whatever 108 00:10:10,640 --> 00:10:16,560 the next one's coming, that, you know, that's just budgeted and clear. And like I said, 109 00:10:16,560 --> 00:10:21,040 this is critical work. We have to make sure what we ask for gets built, that it's built 110 00:10:21,040 --> 00:10:26,160 to specification, that we track everything, that we as built and the, you know, whatever 111 00:10:26,160 --> 00:10:31,380 else, all that processing so that the next time we revisit these streets in 20 or 30 years, 112 00:10:31,380 --> 00:10:37,440 we have really good, accurate records and we know they're built to quality and so forth. 113 00:10:37,440 --> 00:10:41,560 And if I recall the 2019 reconstruction was fairly aggressive. 114 00:10:41,560 --> 00:10:47,920 It is. And we've even gotten more aggressive due to city management's direction. So it's 115 00:10:47,920 --> 00:10:48,920 very aggressive. 116 00:10:48,920 --> 00:10:56,800 All right. We had a motion and a second, right? Okay. Any further discussion? All in favor, 117 00:10:56,800 --> 00:10:57,800 say aye. 118 00:10:57,800 --> 00:10:58,800 Aye. 119 00:10:58,800 --> 00:11:01,960 Thank you. Thank you so much. 120 00:11:01,960 --> 00:11:04,040 Management reports. 121 00:11:04,040 --> 00:11:09,200 Madam Chair, so we have a couple of reports for you. The first one that we have is really 122 00:11:09,200 --> 00:11:13,920 a response to a question we have from member Ryback. I know he's not here, but David Brown's 123 00:11:13,920 --> 00:11:18,560 going to come up and just walk through a very quick couple of slides that he has to address 124 00:11:18,560 --> 00:11:22,480 these amendments associated with this project. 125 00:11:22,480 --> 00:11:30,400 Let me get this set up. 126 00:11:30,400 --> 00:11:57,760 Well, let me see here. Yeah, I had this lined out. Yeah. Yeah, I don't want the full. I'm 127 00:11:57,760 --> 00:12:00,600 twitching over here trying to go over there and help him. 128 00:12:00,600 --> 00:12:06,400 Oh, there you go. Hey, I appreciate it. Thank you. I'm David Brown. I'm project manager 129 00:12:06,400 --> 00:12:11,960 for water utilities. I want to go over Hicker Creek basin contract amendments. There's amendments 130 00:12:11,960 --> 00:12:16,920 to the contract that we want to discuss and kind of give you insight to it. So basically 131 00:12:16,920 --> 00:12:22,420 the original contract amendment one and two and three were for the design bid and construction 132 00:12:22,420 --> 00:12:26,840 phase services for the Hicker Creek detention facility, West Peak flow station and Hicker 133 00:12:26,840 --> 00:12:31,000 Creek lift station. So I'll just kind of tell you what those were. I don't know if you remember 134 00:12:31,000 --> 00:12:35,840 that or not, but the Hicker Creek detention facility, which is here on right here, it's 135 00:12:35,840 --> 00:12:43,540 a three million gallon tank. Basically it's a parking lot for the sewer system or a pantry. 136 00:12:43,540 --> 00:12:49,480 It's not used yet. And that's probably odd how to talk about a pantry, but it parks it 137 00:12:49,480 --> 00:12:56,800 there until the wastewater facility that pecan Creek can treat that. So basically it mitigates 138 00:12:56,800 --> 00:13:02,120 the high flows during rain, rain events. So that's what that's for. The second picture 139 00:13:02,120 --> 00:13:07,700 here is a Hicker Creek lift station. What it is, it is a 11 million gallon per day new 140 00:13:07,700 --> 00:13:12,320 lift station replaced a 40 year old lift station there. That is our largest lift station in 141 00:13:12,320 --> 00:13:17,080 the system at wastewater for the wastewater system in the city of Denton. And that's down 142 00:13:17,080 --> 00:13:21,420 there off of Teasley right across from Geyer high school in the back there. And then the 143 00:13:21,420 --> 00:13:28,920 last picture is our West peak flow pump station at pecan Creek. It's right there as you enter 144 00:13:28,920 --> 00:13:35,360 into the wastewater reclamation plant on the left. It is a new pump station, which is similar 145 00:13:35,360 --> 00:13:39,860 to the Hicker Creek detention facility. What it does, it takes flows off of our Cooper 146 00:13:39,860 --> 00:13:47,000 and pecan Creek interceptors. And what it does, it says, you know, basically, it allows 147 00:13:47,000 --> 00:13:52,680 us to pump additional flows during wet weather over to our basin. So basically it parks it 148 00:13:52,680 --> 00:13:57,520 there when the plant can handle it. Then we push through and go ahead and treat the water 149 00:13:57,520 --> 00:14:02,280 there. So it adds capacity. Both of those, the detention facility and the West peak flow 150 00:14:02,280 --> 00:14:09,880 adds capacity without a big cost on the as far as the plant. The plant's able to treat 151 00:14:09,880 --> 00:14:14,600 a lot of stuff, a lot of wastewater throughout the day, just at certain times and then peak 152 00:14:14,600 --> 00:14:21,160 flows, we need to hold it till a time that we can do it. So that's what the regional 153 00:14:21,160 --> 00:14:26,920 contract amendment one, two, and three were. So then we went to amendment four over at 154 00:14:26,920 --> 00:14:32,560 the Hicker Creek detention facility, which is over at off a country club road there. 155 00:14:32,560 --> 00:14:37,000 Right for right after you get to the railroad tracks, there was a crossing that we need 156 00:14:37,000 --> 00:14:42,960 to do with a water line coming from the neighborhood just to the north of there where we tied into 157 00:14:42,960 --> 00:14:49,440 potable water. We needed water over at the detention facility. So originally this contract 158 00:14:49,440 --> 00:14:57,800 or this design was in 2015. And when it started KCS, they upgraded some of their design standards. 159 00:14:57,800 --> 00:15:05,720 So we needed to do an amendment to meet their design standards. Amendment four, of course, 160 00:15:05,720 --> 00:15:11,320 these were handling also Hicker Creek lift station was on this contract as well. So we 161 00:15:11,320 --> 00:15:20,040 had some delays out there at the Hicker Creek lift station. One of them was a catastrophe 162 00:15:20,040 --> 00:15:27,040 event. Let me get this right catastrophic event. There you go. I got the English working 163 00:15:27,040 --> 00:15:35,200 today. So it was an event in 2019, which filled in the excavation delayed our lift station. 164 00:15:35,200 --> 00:15:41,680 You're shaking your head. You understand that that time. So we good news is the lift station 165 00:15:41,680 --> 00:15:47,440 is in service. It is working. And, you know, we have believed a lot of issues over there. 166 00:15:47,440 --> 00:15:54,880 So it's these are substantially complete all three of these. Amendment six. Basically, 167 00:15:54,880 --> 00:16:00,320 we needed to redesign odor control pad over at the Hicker Creek detention facility. We 168 00:16:00,320 --> 00:16:05,920 had an excavation when they excavated for the lift station there. They use a different alternate 169 00:16:05,920 --> 00:16:10,880 method. So we had to go back and do some peers, basically. And then also a retaining wall 170 00:16:10,880 --> 00:16:16,080 over at Pecan Creek, West Peak flow. So we didn't have to build inside the floodplain. 171 00:16:16,080 --> 00:16:20,120 We built a retaining wall so we didn't get into that floodplain. With that came some 172 00:16:20,120 --> 00:16:25,280 additional construction meetings. And then, like I said, this project is complete and 173 00:16:25,280 --> 00:16:29,480 all the facilities are in service. We're just waiting to close it out. So if anybody has 174 00:16:29,480 --> 00:16:36,080 any questions, be glad to help you make sure. Yes, sir. We should make sure I understand 175 00:16:36,080 --> 00:16:41,280 because I live over in that area and I work over in that area that is just north of the 176 00:16:41,280 --> 00:16:50,120 railroad tracks there at Country Club and near Ryan Road. Yes, sir. We off to the west. 177 00:16:50,120 --> 00:16:55,220 Yes, sir. Okay. Been watching a lot of cranes out there for one. Yeah, we're we're complete 178 00:16:55,220 --> 00:17:00,920 out there. So that's one thing. So that's also just north of that other area that we're 179 00:17:00,920 --> 00:17:11,720 looking at. Okay. All right. That's it. No questions. You always have the good ones. 180 00:17:11,720 --> 00:17:16,280 Thank you. Thank you very much. I appreciate y'all. Thanks, David. So that really was in 181 00:17:16,280 --> 00:17:21,160 response to a couple of questions that member Rybak had. I know he's likely going to watch 182 00:17:21,160 --> 00:17:24,760 this. And so if anyone has any additional questions, certainly let us know. We'll be 183 00:17:24,760 --> 00:17:29,920 happy to address those the next time on the management report. Deme did recently receive 184 00:17:29,920 --> 00:17:34,880 recognition from from the Arbor Day Foundation is a process that we've been working through 185 00:17:34,880 --> 00:17:38,480 for for a couple of years now. We're happy to report that we're finally being recognized 186 00:17:38,480 --> 00:17:46,760 as a tree line city, a utility USA utility, kind of in line with what other utilities 187 00:17:46,760 --> 00:17:52,720 across the state and across the country are doing really good partnership with the Parks 188 00:17:52,720 --> 00:17:57,020 Department's efforts with with the city's recognition as well for being a tree a tree 189 00:17:57,020 --> 00:18:05,000 city USA. They really recognizes the the practices that we have a DME regarding tree trimming 190 00:18:05,000 --> 00:18:11,640 around utility lines. And certainly, after after what's happened down in Austin, San 191 00:18:11,640 --> 00:18:17,600 Antonio, I think really shows the resiliency and the reliability that we have here in Denton. 192 00:18:17,600 --> 00:18:23,120 Now through that through that activity, we've also, you know, identified a couple of areas 193 00:18:23,120 --> 00:18:26,720 that we may want to improve. And so we're going to be working on those, trying to get 194 00:18:26,720 --> 00:18:32,200 some additional contracts, looking at how our telecom and communication providers also 195 00:18:32,200 --> 00:18:36,160 trim around our utility poles. And there's a number of things that we're looking at. 196 00:18:36,160 --> 00:18:40,320 We may be bringing back some recommendations in the future, but happy to answer any questions 197 00:18:40,320 --> 00:18:49,840 that you may have on that particular item. Just a comment when up when Austin was without 198 00:18:49,840 --> 00:18:57,400 for what two weeks, three weeks. And we saw the branches laying around. I was so grateful 199 00:18:57,400 --> 00:19:02,700 for those trucks that go around the neighborhoods and trim trees, because if we hadn't been 200 00:19:02,700 --> 00:19:09,600 doing that, we've been having the same thing. And I'm great job. We appreciate that. Certainly, 201 00:19:09,600 --> 00:19:14,960 we sympathize with, you know, the customers there in Austin. There's certainly a lot of 202 00:19:14,960 --> 00:19:22,160 issues that we don't face here geographically. Certainly, there's a lot of hills in Austin 203 00:19:22,160 --> 00:19:27,760 and a lot of other issues as well that kind of contributed to many of the outages and durations. 204 00:19:27,760 --> 00:19:30,640 So we're thankful that here in Denton, we haven't had to face that. 205 00:19:30,640 --> 00:19:42,600 Well, we've got the old alleyways. Yeah. This is true. Most of the northern developments. 206 00:19:42,600 --> 00:19:48,640 So the next item is regarding future agenda items. We did have a request from at the last 207 00:19:48,640 --> 00:19:55,560 meeting to move up the comprehensive diversion ordinance update. And so we did do that. It's 208 00:19:55,560 --> 00:20:00,440 now scheduled for March the 13th. And our folks in solid waste will be ready to present 209 00:20:00,440 --> 00:20:05,760 all that, have a wastewater master plan that will be coming to you in April. And then after 210 00:20:05,760 --> 00:20:09,680 that, it's budget, budget, budget, right? And so we'll be full steam ahead with you 211 00:20:09,680 --> 00:20:16,920 on budget presentations. And Nick can't wait to be able to do that. And then for new action 212 00:20:16,920 --> 00:20:22,360 items, I already mentioned, you know, the diversion ordinance, we've moved that up in 213 00:20:22,360 --> 00:20:27,200 the timeline. We responded today to the other request, and we don't have any additional 214 00:20:27,200 --> 00:20:31,280 requests at this time for new business, but certainly happy to add additional ones if 215 00:20:31,280 --> 00:20:35,480 you have any. So that's all I have. Are we going to, are we going to see, you know, like 216 00:20:35,480 --> 00:20:40,480 right now, the state of Texas is big problem is how to spend all the extra money they have. 217 00:20:40,480 --> 00:20:48,480 And 26 billion, I think is the number. I think it's closer to 31 billion. 31 billion. Mr. 218 00:20:48,480 --> 00:20:54,120 Comptroller keeps pushing it up. Do we have anything going on like that? Nick, I don't 219 00:20:54,120 --> 00:20:57,920 know if there's anything you want to comment on that. I, you know, I certainly have a lot 220 00:20:57,920 --> 00:21:03,040 of projects that they can fund if they want, but no, to answer your question. So Nick Vincent 221 00:21:03,040 --> 00:21:07,760 interim finance director, I'm not aware of that situation. I do know that general fund 222 00:21:07,760 --> 00:21:11,320 finished about 8 million positive this last fiscal year. So we will have a conversation 223 00:21:11,320 --> 00:21:15,280 with city council regarding that and some funding opportunities that we've identified. 224 00:21:15,280 --> 00:21:20,120 So yeah, are there any opportunities with the state? I mean, I know they're talking, 225 00:21:20,120 --> 00:21:27,240 I mean, I was down there two weeks ago and they were talking a lot about property tax 226 00:21:27,240 --> 00:21:34,560 relief, school funding, one time, one time school funding type things. So, um, good question 227 00:21:34,560 --> 00:21:39,600 and try to stay in the purview of the pub. Um, but there are a lot of bills going through 228 00:21:39,600 --> 00:21:44,180 the state legislature right now. Most of them are focused on limiting, um, ad valorem taxes 229 00:21:44,180 --> 00:21:49,280 for residents. So how much property taxes can increase on residential and non-residential 230 00:21:49,280 --> 00:21:53,000 properties? So we're seeing a bunch of that stuff come through that we're monitoring, 231 00:21:53,000 --> 00:21:56,680 but nothing as far as funding opportunities. But, you know, we're always looking for grant 232 00:21:56,680 --> 00:22:00,640 opportunities if they're out there. I mean, there's ARP funds that the city still has. 233 00:22:00,640 --> 00:22:05,840 We're working to spend, we've identified projects with those proceeds, but massive spending 234 00:22:05,840 --> 00:22:10,440 amounts that are available to city. I haven't seen them yet. Okay. Okay. Well, we'll see. 235 00:22:10,440 --> 00:22:17,480 Well, we'll go. Who's going down to Denton county days? You? Yeah, I don't know who's 236 00:22:17,480 --> 00:22:22,440 going. I'm likely Brian Adams and maybe a contingent of our, our city council is likely 237 00:22:22,440 --> 00:22:30,120 going to be going these normal practices we do every year. Yeah, I'm going to. So realtor 238 00:22:30,120 --> 00:22:38,200 days today. Okay. Okay. I went to associate a general contractor days two weeks ago. Okay. 239 00:22:38,200 --> 00:22:44,000 Um, last item is concluding items. Does the board member wish to have something added 240 00:22:44,000 --> 00:22:51,560 to a future agenda or have anything to say to the public? Okay. Seeing none. It is nine 241 00:22:51,560 --> 00:23:00,720 25. Do you want to make a motion to adjourn? Okay. We are adjourned.