1 00:00:00,000 --> 00:00:09,060 Okay, it is nine o'clock and we do have a quorum. 2 00:00:09,060 --> 00:00:13,720 So call to order the Public Utilities Board for the City of Denton from Monday, January 3 00:00:13,720 --> 00:00:16,120 23rd, 2023. 4 00:00:16,120 --> 00:00:19,180 The first item is presentations from members of the public. 5 00:00:19,180 --> 00:00:22,720 Is there anybody from the public who wishes to speak? 6 00:00:22,720 --> 00:00:26,020 Okay, I see none. 7 00:00:26,020 --> 00:00:31,360 Before we go into consent agenda, we're going to change up the timing of the closed session. 8 00:00:31,360 --> 00:00:34,400 We're moving it from the end to right before the work session. 9 00:00:34,400 --> 00:00:40,800 So we'll go into closed session and we'll reconvene and do the work sessions. 10 00:00:40,800 --> 00:00:45,680 Consent agenda, does any board member wish to pull anything from items A through F? 11 00:00:45,680 --> 00:00:51,760 All right, I am going to pull C. 12 00:00:51,760 --> 00:00:56,640 Do we have a motion to approve items A, B, D, E, and F? 13 00:00:56,640 --> 00:00:57,640 So moved. 14 00:00:57,640 --> 00:00:58,640 Moves. 15 00:00:58,640 --> 00:01:00,120 Do we have a second? 16 00:01:00,120 --> 00:01:01,120 Barbara seconds. 17 00:01:01,120 --> 00:01:02,120 All in favor say aye. 18 00:01:02,120 --> 00:01:03,120 Aye. 19 00:01:03,120 --> 00:01:10,480 Okay, item C. 20 00:01:10,480 --> 00:01:15,760 Billy had to recuse himself, so that's the reason why I pulled item C. So that's the 21 00:01:15,760 --> 00:01:17,640 only reason. 22 00:01:17,640 --> 00:01:20,000 Do we have a motion to approve item C? 23 00:01:20,000 --> 00:01:22,000 Moves. 24 00:01:22,000 --> 00:01:23,000 Do we have second? 25 00:01:23,000 --> 00:01:24,000 Please seconds. 26 00:01:24,000 --> 00:01:25,480 All in favor say aye. 27 00:01:25,480 --> 00:01:26,480 Aye. 28 00:01:26,480 --> 00:01:36,040 I will go and get -- Oh, thank you. 29 00:01:36,040 --> 00:01:39,480 Thanks staff. 30 00:01:39,480 --> 00:01:53,880 As we clear the room. 31 00:01:53,880 --> 00:02:10,080 That was quick. 32 00:02:10,080 --> 00:02:14,920 The next item is consider approval of the January 9th, 2023 minutes. 33 00:02:14,920 --> 00:02:17,520 Do we have any changes or corrections? 34 00:02:17,520 --> 00:02:18,520 All right. 35 00:02:18,520 --> 00:02:20,160 Do we have a motion to approve? 36 00:02:20,160 --> 00:02:21,160 Moves. 37 00:02:21,160 --> 00:02:25,280 Billy moves, Devin seconds, all in favor say aye. 38 00:02:25,280 --> 00:02:26,280 Aye. 39 00:02:26,280 --> 00:02:27,280 Management reports. 40 00:02:27,280 --> 00:02:33,680 Madam Chair, members of the PAB, in your management reports we did provide to you the deck reports 41 00:02:33,680 --> 00:02:36,400 for the month of September. 42 00:02:36,400 --> 00:02:41,280 The finance folks are here if you have any questions on that. 43 00:02:41,280 --> 00:02:46,400 For future agenda items, the only item that we have listed currently is an item for today's 44 00:02:46,400 --> 00:02:52,600 discussion, the finance will be doing a work session regarding DME's budget and rates. 45 00:02:52,600 --> 00:02:57,720 And then on the new business action item, today we also have a presentation of Greensense 46 00:02:57,720 --> 00:03:03,400 that we think will address items number one and number two regarding solar panels and 47 00:03:03,400 --> 00:03:06,280 installations and rebates. 48 00:03:06,280 --> 00:03:12,960 And if you recall, the last meeting we discussed the ERCOT lawsuit with you in closed session, 49 00:03:12,960 --> 00:03:15,040 and so that's been completed as well. 50 00:03:15,040 --> 00:03:18,440 So happy to answer any questions that you have, if there's anything that you'd like 51 00:03:18,440 --> 00:03:23,080 to add for future consideration, let us know. 52 00:03:23,080 --> 00:03:27,080 I have an item for future consideration. 53 00:03:27,080 --> 00:03:33,040 In our consent agenda was another change order for the Hickory Creek station project, and 54 00:03:33,040 --> 00:03:37,200 I wondered since we've had a number of them, it might be worthwhile for us to get an update 55 00:03:37,200 --> 00:03:43,720 and summary of the status of the project and maybe some background about how we've arrived 56 00:03:43,720 --> 00:03:46,320 at the project where we've required so many changes. 57 00:03:46,320 --> 00:03:52,440 Yeah, we'll add it to the list and we'll let Becky, our city engineer, know so she can 58 00:03:52,440 --> 00:03:54,440 get that back to you. 59 00:03:54,440 --> 00:03:59,800 No, I don't think he's talking about the Hickory GIS station. 60 00:03:59,800 --> 00:04:01,280 The sewer. 61 00:04:01,280 --> 00:04:02,280 Okay. 62 00:04:02,280 --> 00:04:03,280 Yeah. 63 00:04:03,280 --> 00:04:13,560 I just think it would be useful to get kind of an overview because we keep getting change 64 00:04:13,560 --> 00:04:14,560 orders on it. 65 00:04:14,560 --> 00:04:19,400 It's obviously the project's difficult, it's had problems, issues, change of scope or change 66 00:04:19,400 --> 00:04:20,400 of circumstances. 67 00:04:20,400 --> 00:04:26,880 I think it might be good for us and for others to get an idea of how we arrived at this situation. 68 00:04:26,880 --> 00:04:30,680 And don't get me wrong, I've worked on plenty of projects that have a lot of problems. 69 00:04:30,680 --> 00:04:32,600 A lot of change orders. 70 00:04:32,600 --> 00:04:33,600 Yes. 71 00:04:33,600 --> 00:04:36,840 We'll let Becky and her staff know and they'll get something back on the agenda for you. 72 00:04:36,840 --> 00:04:37,840 Thank you. 73 00:04:37,840 --> 00:04:38,840 Thank you. 74 00:04:38,840 --> 00:04:39,840 All right. 75 00:04:39,840 --> 00:04:40,840 Then we're into concluding items. 76 00:04:40,840 --> 00:04:42,720 You already added an item. 77 00:04:42,720 --> 00:04:48,840 Does any other board member wish to add items or have anything to say to the public? 78 00:04:48,840 --> 00:04:52,280 I would like to thank Ben Jumper for his service. 79 00:04:52,280 --> 00:04:58,520 He has resigned and there is a candidate that's going to the city council tomorrow for approval. 80 00:04:58,520 --> 00:05:03,680 He had conflicts with his work schedule that he just wasn't able to serve any longer. 81 00:05:03,680 --> 00:05:05,000 All right. 82 00:05:05,000 --> 00:05:09,560 So now it'll be time to go into closed session and the legal staff, our wonderful legal staff 83 00:05:09,560 --> 00:05:15,600 gives me this to say, the Public Utilities Board will now at 9.05 a.m. convene into a 84 00:05:15,600 --> 00:05:21,960 closed meeting to deliberate the closed meeting items set forth on the agenda, which include 85 00:05:21,960 --> 00:05:30,160 the following, A, PUB 23017, deliberations regarding certain public power utilities competitive 86 00:05:30,160 --> 00:05:37,080 matters under Texas government code section 551.086, consultation with attorneys under 87 00:05:37,080 --> 00:05:47,200 Texas government code section 551.071, and B, PUB 23018, deliberations regarding certain 88 00:05:47,200 --> 00:05:54,760 public power utilities competitive matters under Texas government code section 551.086, 89 00:05:54,760 --> 00:06:01,520 consultation with attorneys under Texas government code section 551.071. 90 00:06:01,520 --> 00:06:08,520 Thank you. 91 00:06:31,520 --> 00:06:38,520 Thank you. 92 00:06:38,520 --> 00:06:45,520 Thank you. 93 00:06:45,520 --> 00:06:52,520 Thank you. 94 00:06:52,520 --> 00:06:59,520 Thank you. 95 00:06:59,520 --> 00:07:06,520 All right. 96 00:07:06,520 --> 00:07:21,520 It is 9.48 and the Public Utilities Board has now reconvened from closed session and 97 00:07:21,520 --> 00:07:23,480 no official action was taken. 98 00:07:23,480 --> 00:07:27,760 We are on to our work session where we're going to receive a report, hold a discussion 99 00:07:27,760 --> 00:07:33,760 and give direction regarding the electric fiscal year 2022-2023 budget and rates. 100 00:07:33,760 --> 00:07:38,560 Good morning, Chair and PUB members, Nick Vincent, Interim Finance Director, let me 101 00:07:38,560 --> 00:07:39,720 get this pulled up. 102 00:07:39,720 --> 00:07:44,760 I like the way you put the estimated time in the discussion here. 103 00:07:44,760 --> 00:07:46,760 Yeah, Tony was taking bets I can get through it in five minutes. 104 00:07:46,760 --> 00:07:51,360 I said, okay, I'll see how fast I can get through it. 105 00:07:51,360 --> 00:07:52,360 Let me get this here. 106 00:07:52,360 --> 00:07:53,360 Hang on a second. 107 00:07:53,360 --> 00:07:56,120 Okay, so really let's just talk about an overview of why we're here today. 108 00:07:56,120 --> 00:08:01,080 We want to talk to you about the fiscal year 2022 end of year numbers, so the fiscal year 109 00:08:01,080 --> 00:08:04,920 that ended last September, September 2022. 110 00:08:04,920 --> 00:08:08,400 Talk to you about the financial assumptions included in the adopted budget. 111 00:08:08,400 --> 00:08:13,400 Talk to you about the updated forecast for fiscal year 2023 and we'll talk about recommendations 112 00:08:13,400 --> 00:08:17,960 and next steps. 113 00:08:17,960 --> 00:08:23,400 So this slide here is just take some numbers from the pro forma, really focus some attention 114 00:08:23,400 --> 00:08:24,400 to them. 115 00:08:24,400 --> 00:08:29,880 We're looking at some numbers that changed in fiscal year 2022, quite a bit from budget. 116 00:08:29,880 --> 00:08:32,200 So let me walk you through this really quick. 117 00:08:32,200 --> 00:08:37,680 So you can see actual sales forecast or revenue exceeded budget by 10 million. 118 00:08:37,680 --> 00:08:40,640 So there's two components to a residential customer's bill. 119 00:08:40,640 --> 00:08:43,800 Of course, you have the base revenue and you have the ECA revenue. 120 00:08:43,800 --> 00:08:47,520 We'll talk about that a little bit here in the forecast, but you can see base revenue 121 00:08:47,520 --> 00:08:50,080 exceeded forecast about $10 million. 122 00:08:50,080 --> 00:08:53,980 So we are continuing to see an increase in our sales of electricity in the community 123 00:08:53,980 --> 00:08:55,640 as we continue to grow. 124 00:08:55,640 --> 00:09:03,080 ECA about $1.5 million and then non-rate revenue actually increased about $50.9 million in the 125 00:09:03,080 --> 00:09:04,080 fiscal year 2022. 126 00:09:04,080 --> 00:09:06,640 There were a couple of big things that were included in that. 127 00:09:06,640 --> 00:09:12,360 So the city did receive revenue from the sale of the TMPA facility as about $15 million 128 00:09:12,360 --> 00:09:17,080 and we did have some increased revenue associated with the deck running more last fiscal year. 129 00:09:17,080 --> 00:09:21,120 So did have some increased run times for that facility. 130 00:09:21,120 --> 00:09:25,080 Purchase power, you can see down here we did purchase about $38 million more in purchase 131 00:09:25,080 --> 00:09:27,160 power than we originally budgeted. 132 00:09:27,160 --> 00:09:31,800 If you remember, we did take a budget amendment forward for electric last fiscal year to make 133 00:09:31,800 --> 00:09:33,860 sure we had plenty of expense authority. 134 00:09:33,860 --> 00:09:39,840 So it's a little bit higher energy prices and energy consumption. 135 00:09:39,840 --> 00:09:41,000 Then I will go to the next slide. 136 00:09:41,000 --> 00:09:42,760 If you have questions, just feel free to stop me. 137 00:09:42,760 --> 00:09:45,880 I'm not going to try to rush through it too fast here. 138 00:09:45,880 --> 00:09:49,960 So this slide really highlights at a really high level the assumptions that were included 139 00:09:49,960 --> 00:09:51,220 in the adopted budget. 140 00:09:51,220 --> 00:09:55,040 So you can see everything is based on megawatt hours. 141 00:09:55,040 --> 00:10:01,560 So MWH, you can see that right here, our sales forecast for customers. 142 00:10:01,560 --> 00:10:02,960 Return on investment, 6%. 143 00:10:02,960 --> 00:10:07,520 We did discuss this with the PB and City Council of increasing that from the three and a half 144 00:10:07,520 --> 00:10:09,920 to 6% and taking it forward. 145 00:10:09,920 --> 00:10:14,640 TMRS, so Texas Municipal Retirement System, that contribution to the retirement plan for 146 00:10:14,640 --> 00:10:20,760 city employees, increase from 17.65 to 18.15%. 147 00:10:20,760 --> 00:10:25,120 Moving over to the revised assumptions column, what we've done in an effort to really summarize 148 00:10:25,120 --> 00:10:29,680 what is updated in the forecast today is we've underlined the items that have changed. 149 00:10:29,680 --> 00:10:33,880 So we've updated our non-rate revenue, I think the question was asked earlier, we revised 150 00:10:33,880 --> 00:10:38,520 the data center revenue and then of course we revised the data center expenses and we'll 151 00:10:38,520 --> 00:10:44,800 talk about that in the forecast here in just a second. 152 00:10:44,800 --> 00:10:48,600 Okay, everybody has seen this before, I think everybody was here last budgeting cycle, but 153 00:10:48,600 --> 00:10:51,800 this is the five-year forecast with electric utility. 154 00:10:51,800 --> 00:10:55,600 So I'm going to take my time and go through it here and if you have any questions, definitely 155 00:10:55,600 --> 00:10:56,600 ask them. 156 00:10:56,600 --> 00:11:01,160 2021, so a couple of fiscal years ago, you can see how we finished the year, won't talk 157 00:11:01,160 --> 00:11:03,760 too much about that, that's been a couple of years ago. 158 00:11:03,760 --> 00:11:07,100 2022, so this is the fiscal year we just finished, right? 159 00:11:07,100 --> 00:11:11,140 Here's the adopted budget and here's where the preliminary actuals are. 160 00:11:11,140 --> 00:11:14,240 This does say preliminary actuals because we are still in the process of putting the 161 00:11:14,240 --> 00:11:19,260 annual comprehensive report together, also referred to as the ACFIR. 162 00:11:19,260 --> 00:11:23,660 So we don't anticipate these to change, but we did want to put that caveat in there. 163 00:11:23,660 --> 00:11:28,280 So the adopted 2022 budget contemplated we had finished the year about $5 million positive, 164 00:11:28,280 --> 00:11:30,800 you can see that number right here. 165 00:11:30,800 --> 00:11:35,660 Where we ended up finishing the year was about $22.7 million positive, so we did have a better 166 00:11:35,660 --> 00:11:38,780 fiscal year ending 2022. 167 00:11:38,780 --> 00:11:43,080 And that's important to note, right, because that helps us play into our recommendation 168 00:11:43,080 --> 00:11:45,000 today that we're fixing to talk to you about. 169 00:11:45,000 --> 00:11:47,920 So this is very important to understand that. 170 00:11:47,920 --> 00:11:53,420 2023 is circled here in this box, so you can see the adopted budget that was adopted last 171 00:11:53,420 --> 00:11:58,740 fall contemplated using about $15.5 million in reserves. 172 00:11:58,740 --> 00:12:05,320 What that did is it would leave us an ending fund balance about $125.2, as we originally 173 00:12:05,320 --> 00:12:06,540 were forecasting. 174 00:12:06,540 --> 00:12:11,340 So what's important, right, given the amount of money, the $22.7 million that DME brought 175 00:12:11,340 --> 00:12:16,660 in in fiscal year 2022, the fund balance actually finished better at the end of the year than 176 00:12:16,660 --> 00:12:18,260 we anticipated, right? 177 00:12:18,260 --> 00:12:24,500 So we originally are anticipating $127.7, we finished the year about $140.7. 178 00:12:24,500 --> 00:12:30,260 So we are anticipating using more reserves this fiscal year, so we have updated the non-rate 179 00:12:30,260 --> 00:12:31,560 revenue. 180 00:12:31,560 --> 00:12:37,220 What is included in non-rate revenue is just, it could be data center revenue, it could 181 00:12:37,220 --> 00:12:40,860 be data center, T-cost revenue, and some miscellaneous revenues. 182 00:12:40,860 --> 00:12:45,300 So I think even the DEC is included in there, so that has been updated. 183 00:12:45,300 --> 00:12:49,620 Now, moving to the expenses, everything for the end of your estimate that we're currently 184 00:12:49,620 --> 00:12:57,380 estimating is equal to budget, except data center expenses, T-cost, well, T-cost, I don't 185 00:12:57,380 --> 00:13:00,780 mean expenses, but anything to do with the data center mostly. 186 00:13:00,780 --> 00:13:04,480 So about $29 million in reserve usage. 187 00:13:04,480 --> 00:13:09,460 Moving down the page, we're forecasting to finish the year at about $111.7 million in 188 00:13:09,460 --> 00:13:10,460 reserves. 189 00:13:10,460 --> 00:13:15,180 Now, you know, practicality, right, how does that align with the reserve targets that the 190 00:13:15,180 --> 00:13:18,640 PV and City Council established a couple years ago? 191 00:13:18,640 --> 00:13:20,540 That is below the reserve targets. 192 00:13:20,540 --> 00:13:25,620 You may remember we set the reserve at 46 as a minimum and 69 as a max. 193 00:13:25,620 --> 00:13:27,860 And this was in response to Winter Storm URI, right? 194 00:13:27,860 --> 00:13:32,140 We realized that we needed to have more on hand, so we increased those reserve targets. 195 00:13:32,140 --> 00:13:34,140 So we're still below the reserve target. 196 00:13:34,140 --> 00:13:38,340 But, you know, one thing I want to note, right, there is a lot of uncertainty in this forecast. 197 00:13:38,340 --> 00:13:45,580 This forecast has not been updated for electric sales projections, have not been updated. 198 00:13:45,580 --> 00:13:49,560 So we do continue to see increased electric sales in the community. 199 00:13:49,560 --> 00:13:51,600 That will modify this pro forma. 200 00:13:51,600 --> 00:13:56,380 We have not updated our end of year estimate for O&M expenses, so operation and maintenance 201 00:13:56,380 --> 00:14:00,580 expenses, purchase power forecast needs to be updated, so there's a lot of things yet 202 00:14:00,580 --> 00:14:02,540 to be updated. 203 00:14:02,540 --> 00:14:05,900 Given those things that are still outstanding and coming into the summer months, we are 204 00:14:05,900 --> 00:14:08,220 currently not recommending a rate increase. 205 00:14:08,220 --> 00:14:10,740 Now, a couple things I want to say, right? 206 00:14:10,740 --> 00:14:11,740 Yes, sir. 207 00:14:11,740 --> 00:14:12,740 >> Yes. 208 00:14:12,740 --> 00:14:17,220 >> When do you anticipate those updates will be made in the forecast here? 209 00:14:17,220 --> 00:14:21,460 >> So we had that debate, Terry and I actually had the debate for a couple hours, I was joking, 210 00:14:21,460 --> 00:14:23,540 but it was a while, right? 211 00:14:23,540 --> 00:14:26,300 It is premature now to make that update. 212 00:14:26,300 --> 00:14:31,860 We do think those updates, or we know those updates will be included in the budget conversations. 213 00:14:31,860 --> 00:14:35,660 So starting, I'm looking at Danielle here, I think the first conversation we have is 214 00:14:35,660 --> 00:14:40,940 in May, so in May, those updates will be included in the forecast, yeah. 215 00:14:40,940 --> 00:14:42,740 >> I have a question also. 216 00:14:42,740 --> 00:14:45,620 We just approved that insurance policy last month, too. 217 00:14:45,620 --> 00:14:51,860 So what impact would having that mechanism have to maybe not needing as much working 218 00:14:51,860 --> 00:14:55,680 capital for the minimum reserves, or is it not at all? 219 00:14:55,680 --> 00:14:58,100 >> So I think it is the outage insurance? 220 00:14:58,100 --> 00:14:59,100 >> The outage insurance, yes. 221 00:14:59,100 --> 00:15:00,500 >> Do you want to speak to that, Tony? 222 00:15:00,500 --> 00:15:03,180 I don't know when it kicks in? 223 00:15:03,180 --> 00:15:09,020 >> So the outage insurance is just to cover the winter months in the event of an outage. 224 00:15:09,020 --> 00:15:16,700 So I think the new number is around 450,000, about 200,000, almost 200,000 less than what 225 00:15:16,700 --> 00:15:21,020 you approved once we settled that contract. 226 00:15:21,020 --> 00:15:29,740 So I think the impact is pretty minimal on this fund, yes, ma'am. 227 00:15:29,740 --> 00:15:34,700 >> Okay, I'm going to look down just for a second here, and if you have any questions, 228 00:15:34,700 --> 00:15:36,340 wave at me or yell. 229 00:15:36,340 --> 00:15:39,940 So 0% is what we're currently forecasting for this year. 230 00:15:39,940 --> 00:15:43,800 Now if things change, right, we can come back to the Public Utility Board, come back to 231 00:15:43,800 --> 00:15:47,140 City Council when we get there, talk about those rate increases. 232 00:15:47,140 --> 00:15:52,060 Moving into the future years, right, I think Ms. Russell had asked this question earlier, 233 00:15:52,060 --> 00:15:55,140 are we contemplating rate increases, and the answer is yes. 234 00:15:55,140 --> 00:15:59,980 Starting in fiscal year '24 through fiscal year 2026, you can see we have rate increases 235 00:15:59,980 --> 00:16:01,400 plugged in. 236 00:16:01,400 --> 00:16:06,820 This rate increase is just to the ECA rate, right, so the energy cost adjustment rate 237 00:16:06,820 --> 00:16:09,260 is what this is to currently. 238 00:16:09,260 --> 00:16:13,460 Our thought process is, right, is we have a cost of service study going on in the electric 239 00:16:13,460 --> 00:16:15,300 utility right now. 240 00:16:15,300 --> 00:16:19,820 We do anticipate finishing that within the next couple of months and bringing those recommendations 241 00:16:19,820 --> 00:16:22,420 forward to you as part of the budgeting process. 242 00:16:22,420 --> 00:16:25,940 So a couple of things need to happen, right, we do need to set the stage and talk to the 243 00:16:25,940 --> 00:16:30,620 Public Utility Board about the ECA rate fluctuating, moving forward. 244 00:16:30,620 --> 00:16:34,340 Currently it is flat, it does not adjust year to year with energy prices. 245 00:16:34,340 --> 00:16:37,940 That is something that needs to be addressed in this fund, right, it has vulnerability, 246 00:16:37,940 --> 00:16:40,800 it creates risk for this fund. 247 00:16:40,800 --> 00:16:44,880 So we do anticipate to talk to you about that here in the coming months. 248 00:16:44,880 --> 00:16:48,140 One other thing just really quick, so on the five-year forecast you can see the reserve 249 00:16:48,140 --> 00:16:51,380 dips down to about 91.7 million. 250 00:16:51,380 --> 00:16:55,580 So these rate increases may change, but our rate recommendation going forward to get that 251 00:16:55,580 --> 00:16:58,940 reserve above the reserve requirement in the fifth year. 252 00:16:58,940 --> 00:17:03,820 So it looks good from a bond rating agency perspective when we get ready to issue bonds. 253 00:17:03,820 --> 00:17:09,320 There is a lot of information, feel free to tell me to back up if you think of something 254 00:17:09,320 --> 00:17:10,840 else. 255 00:17:10,840 --> 00:17:14,820 So I have already said this multiple times, no mid-year rate increases is staff's recommendation 256 00:17:14,820 --> 00:17:16,500 currently. 257 00:17:16,500 --> 00:17:21,260 We do have the notice of intent for bond issuance coming forward to you, I believe the first 258 00:17:21,260 --> 00:17:26,940 one I got a note here, coming forward to you in March. 259 00:17:26,940 --> 00:17:32,360 So you will see what bond issuance we plan to issue this June for the electric utility. 260 00:17:32,360 --> 00:17:36,740 We will continue to update the purchase power forecast, we mentioned that earlier, look 261 00:17:36,740 --> 00:17:41,660 at the retail sales forecast, and then the timing of potential data center completion, 262 00:17:41,660 --> 00:17:46,380 and then reevaluating those future rate increases. 263 00:17:46,380 --> 00:17:49,940 So upcoming discussions, this starts the budget calendar, we are in that time of the year 264 00:17:49,940 --> 00:17:55,860 again so you will see these dates start to pop up on your future rate work session matrix. 265 00:17:55,860 --> 00:17:58,460 So May 22nd is the first conversation. 266 00:17:58,460 --> 00:18:02,140 At that meeting we will have an updated end of year forecast for you and start talking 267 00:18:02,140 --> 00:18:08,140 about the preliminary 2024 budget and this takes us all the way through budget and rate 268 00:18:08,140 --> 00:18:17,100 approval which is on July 24th for the public utility board. 269 00:18:17,100 --> 00:18:18,100 Yes sir. 270 00:18:18,100 --> 00:18:25,900 I'm just curious, the bond issuance, what kinds of projects or expenses is that bond 271 00:18:25,900 --> 00:18:28,760 issuance looking to cover just at a high level? 272 00:18:28,760 --> 00:18:34,380 So great question, I can't remember off the top of my head, but I want to say $60-70 million 273 00:18:34,380 --> 00:18:40,140 in projects for the electric utility, it includes transmission, distribution, new construction 274 00:18:40,140 --> 00:18:46,380 for new developments, hopefully that answers your question, Tony did I miss something? 275 00:18:46,380 --> 00:18:50,820 I think the largest project for this year that we actually started and awarded contract 276 00:18:50,820 --> 00:18:56,780 earlier in the year or late last year was the Hickory GIS substation, that's a $40 million 277 00:18:56,780 --> 00:19:03,340 plus dollar construction project, but that's probably the single largest project that we 278 00:19:03,340 --> 00:19:05,340 have in the CIP. 279 00:19:05,340 --> 00:19:09,980 Going forward we're still looking at a couple of other needs, we're still kind of developing 280 00:19:09,980 --> 00:19:14,760 those now, but probably a couple of other substations within that next five year to 281 00:19:14,760 --> 00:19:20,700 ten year window, and so we'll be bringing that back to you, we're still in the development 282 00:19:20,700 --> 00:19:22,780 phase of that CIP. 283 00:19:22,780 --> 00:19:27,340 Thank you. 284 00:19:27,340 --> 00:19:28,580 Mr. Taylor go ahead. 285 00:19:28,580 --> 00:19:29,580 Thank you. 286 00:19:29,580 --> 00:19:37,740 Regarding DME's rates, the current residential retail rate is it approximately 10.8 cents? 287 00:19:37,740 --> 00:19:42,900 It's about 10.5, but then once you build in the fixed rates about 11. 288 00:19:42,900 --> 00:19:51,100 Okay, and the current ERCOT wide retail rate, like is, my understanding is like something 289 00:19:51,100 --> 00:19:53,020 like 15 or 16 cents? 290 00:19:53,020 --> 00:19:55,660 North of 17 cents. 291 00:19:55,660 --> 00:20:03,180 So I think we never want to raise rates, we want to have as efficient and cost effective 292 00:20:03,180 --> 00:20:12,780 and low cost as possible rates, but we don't exist independent of the oil and gas market 293 00:20:12,780 --> 00:20:16,140 or ERCOT or the rest of the grid. 294 00:20:16,140 --> 00:20:21,860 So you know I think it's pretty amazing that we are looking at holding our rates at 10.8 295 00:20:21,860 --> 00:20:32,220 whenever I see a lot of electrical invoices in my job from six different electrical providers, 296 00:20:32,220 --> 00:20:38,580 and we've typically seen two to four cents per kilowatt hour rate increases in the last 297 00:20:38,580 --> 00:20:39,820 year and a half. 298 00:20:39,820 --> 00:20:46,100 So that we are still level and there are challenges in the budget to do that, and there's challenges 299 00:20:46,100 --> 00:20:50,940 in operations to keep that efficiency, but it's pretty amazing that DME has been able 300 00:20:50,940 --> 00:20:58,660 to keep those rates level when everybody around us has been forced to increase their rates 301 00:20:58,660 --> 00:21:03,620 by 20 to 40 percent often in a year or less. 302 00:21:03,620 --> 00:21:11,020 So I just want to commend DME's management foresight 10 years ago and five years ago 303 00:21:11,020 --> 00:21:19,860 and last year that has allowed us to be in a position where we don't have an ECA that 304 00:21:19,860 --> 00:21:25,340 went up three cents last year, which I've experienced with other utilities. 305 00:21:25,340 --> 00:21:35,540 And so I think this is, and even with all of the challenges faced, T-costs and other 306 00:21:35,540 --> 00:21:40,740 things we've covered in the closed session, it's really great to see that we can hold 307 00:21:40,740 --> 00:21:48,420 our rates steady this year, and a five percent rate increase next year is pretty amazing 308 00:21:48,420 --> 00:21:51,000 compared to what's been going on in ERCOT. 309 00:21:51,000 --> 00:21:56,260 And we haven't had a rate increase for, what did you say Tony, six years? 310 00:21:56,260 --> 00:21:58,580 At the end of this year will be six years. 311 00:21:58,580 --> 00:22:03,500 We've actually decreased rates four and a half percent in that time frame. 312 00:22:03,500 --> 00:22:07,220 That's not just for the electric utility, all utilities, right, and some utilities actually 313 00:22:07,220 --> 00:22:12,220 had rate decreases like solid waste, yeah, exactly. 314 00:22:12,220 --> 00:22:20,280 What I'll point out, Nick, if you'll go back to the forecast really quick, if you look 315 00:22:20,280 --> 00:22:26,260 at that estimate column down in the ending fund balance, you know, $111 million and then, 316 00:22:26,260 --> 00:22:30,780 you know, the bottom line reserve is, you know, $128 million where we need to be kind 317 00:22:30,780 --> 00:22:34,140 of the, you know, that's the floor. 318 00:22:34,140 --> 00:22:39,740 If you remember in the previous slide, Nick showed that our sales, you know, our revenue 319 00:22:39,740 --> 00:22:43,140 increased $10 million, right, just from increased usage. 320 00:22:43,140 --> 00:22:47,900 If that happens again this year, just that one factor alone could get us back to at least 321 00:22:47,900 --> 00:22:51,700 the minimum, you know, and I think that's one of the reasons why we kind of want to 322 00:22:51,700 --> 00:22:56,220 take a wait and see approach and see how things develop, but just that one little factor there 323 00:22:56,220 --> 00:23:02,380 can change the picture to try to get out ahead of a mid-year rate increase at this point 324 00:23:02,380 --> 00:23:05,300 to probably still a little premature. 325 00:23:05,300 --> 00:23:11,740 Of course, that all comes in in the summertime when we're in the middle of budget, so. 326 00:23:11,740 --> 00:23:18,820 Yeah, it certainly has and certainly surprised us, although I think we still have maybe another 327 00:23:18,820 --> 00:23:25,260 one or two cold spells predicted here before it's all said and done. 328 00:23:25,260 --> 00:23:27,500 Okay, that's it. 329 00:23:27,500 --> 00:23:29,500 No more questions. 330 00:23:29,500 --> 00:23:30,500 Thank you. 331 00:23:30,500 --> 00:23:32,500 All right, the next item. 332 00:23:32,500 --> 00:23:37,020 That wasn't 30 minutes, wait a minute. 333 00:23:37,020 --> 00:23:41,780 Nick wins the bet. 334 00:23:41,780 --> 00:23:45,380 Receive a presentation, hold a discussion, and give staff direction regarding proposed 335 00:23:45,380 --> 00:23:50,060 rates to the Green Sense Incentive Program and rates related to distributive generation 336 00:23:50,060 --> 00:23:57,020 from renewable sources interconnected with DME service territory. 337 00:23:57,020 --> 00:24:11,620 Good morning, Madam Chair, PV members, I'm Bill Shepard with DME. 338 00:24:11,620 --> 00:24:17,980 Today, I'm going to talk to you about our Green Sense Program, our rebate program, and 339 00:24:17,980 --> 00:24:22,820 the relative impacts that we're seeing at DME from those, as well as talk about some 340 00:24:22,820 --> 00:24:28,860 options towards the end on how we can move forward and maybe address some of the impacts 341 00:24:28,860 --> 00:24:33,140 that we're seeing. 342 00:24:33,140 --> 00:24:40,140 So from a relative standpoint, our cost comparison on the programs, you can see the Green Sense 343 00:24:40,140 --> 00:24:44,920 Programs on the left and the solar rebate programs on the right. 344 00:24:44,920 --> 00:24:49,860 From a dollar effectiveness, a dollar effectiveness per kilowatt hour, you can see that the Green 345 00:24:49,860 --> 00:24:54,580 Sense Programs on the left are much more effective, about six times more effective on the amount 346 00:24:54,580 --> 00:24:58,940 of energy that they reduce from our system versus solar. 347 00:24:58,940 --> 00:25:04,060 Maybe you said this already, what length of time is this? 348 00:25:04,060 --> 00:25:07,140 This is since 2009, thank you. 349 00:25:07,140 --> 00:25:12,260 So yeah, the Green Sense Programs came on board a little bit earlier than the solar 350 00:25:12,260 --> 00:25:16,340 program, so bringing them back to parity at 2009. 351 00:25:16,340 --> 00:25:19,460 So another point of distinction I want to make, too, is that three kilowatt hours that 352 00:25:19,460 --> 00:25:24,980 you're seeing on the dollar spent on the solar rebate program, those are offsetting dollars. 353 00:25:24,980 --> 00:25:29,660 So those aren't reductions of energy, that's just replacing one form of energy with the 354 00:25:29,660 --> 00:25:34,980 other, which is solar rooftop, which as you know, DME being 100% renewable, it's really 355 00:25:34,980 --> 00:25:38,100 replacing one renewable for another. 356 00:25:38,100 --> 00:25:43,860 Also those amount of dollars spent on the Green Sense Programs have impacted 5,700 customers 357 00:25:43,860 --> 00:25:46,780 versus about 600 customers on the solar. 358 00:25:46,780 --> 00:25:56,940 So from a dollar standpoint, the Green Sense we feel is a much more effective program. 359 00:25:56,940 --> 00:26:01,780 So some of the financial impacts that we see, there's two primary impacts. 360 00:26:01,780 --> 00:26:06,620 One is the direct costs that we're spending on the rebate dollars, which is about $500,000 361 00:26:06,620 --> 00:26:07,820 per year. 362 00:26:07,820 --> 00:26:13,380 You can see the average rebate per system is about $5,700, so that's $5,700 per customer 363 00:26:13,380 --> 00:26:19,620 versus a few hundred in rebates across many, many more customers. 364 00:26:19,620 --> 00:26:26,340 But those rebate dollars could also be better spent sending those or redirecting those to 365 00:26:26,340 --> 00:26:33,180 the Green Sense Program and funding a little bit more of those more cost-effective programs. 366 00:26:33,180 --> 00:26:37,460 The other impact, which is a little bit more disturbing for us, is the amount of money 367 00:26:37,460 --> 00:26:40,100 that we're spending on the energy coming back to us. 368 00:26:40,100 --> 00:26:45,660 We're spending retail plus that we're giving those customers for energy they send back 369 00:26:45,660 --> 00:26:46,920 to us. 370 00:26:46,920 --> 00:26:50,620 So this past year, it was $1.7 million. 371 00:26:50,620 --> 00:26:53,340 That's a year ending FY22. 372 00:26:53,340 --> 00:26:56,940 That's since program inception of 2007. 373 00:26:56,940 --> 00:27:01,300 But also we're seeing that amount doubling each year. 374 00:27:01,300 --> 00:27:04,460 So this year, we're anticipating a little bit over a million dollars that we're going 375 00:27:04,460 --> 00:27:09,500 to be sending back to customers for the energy that they're giving us. 376 00:27:09,500 --> 00:27:14,300 So why that's disturbing to us is it's directly offsetting their fixed cost contribution or 377 00:27:14,300 --> 00:27:18,540 the fixed cost that they really should be paying for the system that's out there to 378 00:27:18,540 --> 00:27:23,040 provide energy regardless of how much they're using. 379 00:27:23,040 --> 00:27:29,300 So and just to put that also into context, for every $1.5 million of expenditures on 380 00:27:29,300 --> 00:27:35,520 DME side, it provides about a 1 percent impact upward pressure on rates. 381 00:27:35,520 --> 00:27:40,420 So again, with that compounding the way it is every year, and I do have a chart that'll 382 00:27:40,420 --> 00:27:43,840 show that out in the future years. 383 00:27:43,840 --> 00:27:48,780 It's pretty scary, but that'll definitely start having some direct impact on the rates 384 00:27:48,780 --> 00:27:53,700 that our other customers are seeing. 385 00:27:53,700 --> 00:27:57,380 So in that sense, I'm going to give you a comparison here. 386 00:27:57,380 --> 00:28:02,140 So the customer on the left is just a regular DME customer with no solar, and the one on 387 00:28:02,140 --> 00:28:04,760 the right is a solar customer. 388 00:28:04,760 --> 00:28:08,420 You can see that they pay -- there's three primary components of their bill. 389 00:28:08,420 --> 00:28:09,660 There's the facility charge. 390 00:28:09,660 --> 00:28:10,660 It's a fixed cost. 391 00:28:10,660 --> 00:28:15,300 There's a consumption charge, which is based on the energy that they're using. 392 00:28:15,300 --> 00:28:18,620 And then there's also the energy charge, which is a direct pass through. 393 00:28:18,620 --> 00:28:24,140 So it's what DME spends in the market to get them energy to their meter. 394 00:28:24,140 --> 00:28:28,920 So that total bill on the customer on the left for 1,000 kilowatt hours is $111. 395 00:28:28,920 --> 00:28:33,540 Now again, one more point of distinction is these customers have the identical impact 396 00:28:33,540 --> 00:28:34,960 to our system. 397 00:28:34,960 --> 00:28:42,500 So in terms of poles, wires, equipment, customer service, billing, all that kind of stuff, 398 00:28:42,500 --> 00:28:48,780 no matter what energy they use, they have the identical impact to our system in terms 399 00:28:48,780 --> 00:28:51,020 of fixed costs. 400 00:28:51,020 --> 00:28:53,180 So that bill on the left is $111. 401 00:28:53,180 --> 00:28:56,020 Same customer on the right has a solar system. 402 00:28:56,020 --> 00:28:59,700 They're sending 1,000 kilowatt hours back to us. 403 00:28:59,700 --> 00:29:04,260 You can see that we're paying them a full usage credit for that energy coming back to 404 00:29:04,260 --> 00:29:05,260 us. 405 00:29:05,260 --> 00:29:08,300 So the 6840 offsets the 6840 we just billed. 406 00:29:08,300 --> 00:29:15,140 And we're also paying a premium on top of the energy, which we call an RCA, or renewable 407 00:29:15,140 --> 00:29:18,100 cost adjustment, going back to that customer. 408 00:29:18,100 --> 00:29:21,020 So their net bill is about $5. 409 00:29:21,020 --> 00:29:27,100 Obviously they're not paying anywhere near their fixed cost contribution because the fixed 410 00:29:27,100 --> 00:29:32,780 cost contribution for our typical residential customer is about $62.55 a month. 411 00:29:32,780 --> 00:29:37,580 So a customer on the left offsetting, well, a little bit more than half of their bill 412 00:29:37,580 --> 00:29:39,580 is going towards that fixed cost. 413 00:29:39,580 --> 00:29:41,820 The one on the left is short. 414 00:29:41,820 --> 00:29:47,700 And quite honestly, the one on the -- our normal solar -- or our normal non-solar customers 415 00:29:47,700 --> 00:29:53,540 are subsidizing our PV customers because it's going to result in further and further rate 416 00:29:53,540 --> 00:29:55,940 pressure on their rates. 417 00:29:55,940 --> 00:29:58,980 So there's two main ways to address that. 418 00:29:58,980 --> 00:30:02,540 One is by paying a more appropriate cost for that energy coming back to us. 419 00:30:02,540 --> 00:30:06,660 So instead of -- let's see, can you see my -- yeah. 420 00:30:06,660 --> 00:30:12,140 Instead of paying this amount, just pay an energy equivalent amount for that energy coming 421 00:30:12,140 --> 00:30:13,140 back to us. 422 00:30:13,140 --> 00:30:16,940 Not a premium, but just like an ECA type amount. 423 00:30:16,940 --> 00:30:18,980 And then the other -- I'm sorry. 424 00:30:18,980 --> 00:30:23,700 Where does that go on your income statement, the return? 425 00:30:23,700 --> 00:30:27,620 The return -- the credit that we're paying back? 426 00:30:27,620 --> 00:30:28,620 >> Yeah. 427 00:30:28,620 --> 00:30:31,420 It's just an expense. 428 00:30:31,420 --> 00:30:36,420 >> So that -- so that the credit, if there is one in this one, there wouldn't be a credit, 429 00:30:36,420 --> 00:30:37,420 right? 430 00:30:37,420 --> 00:30:40,580 But if there is a credit, it goes into their bill and it just carries over. 431 00:30:40,580 --> 00:30:43,180 If in that particular month it generated excess power. 432 00:30:43,180 --> 00:30:51,260 >> And that -- on the income statement of ours, of the cities, it's an expense? 433 00:30:51,260 --> 00:30:52,260 >> Yeah. 434 00:30:52,260 --> 00:30:54,180 >> Just an offsetting expense? 435 00:30:54,180 --> 00:30:55,180 >> Yes. 436 00:30:55,180 --> 00:30:56,660 It's actually a reduction in revenue. 437 00:30:56,660 --> 00:30:57,660 >> Reduction in revenue. 438 00:30:57,660 --> 00:30:58,660 >> Yeah. 439 00:30:58,660 --> 00:30:59,660 >> Yeah. 440 00:30:59,660 --> 00:31:00,660 Okay. 441 00:31:00,660 --> 00:31:01,660 >> Yes. 442 00:31:01,660 --> 00:31:02,660 Member Ryback. 443 00:31:02,660 --> 00:31:09,180 >> So are we -- is DME actually getting the use of that power back or are we simply issuing 444 00:31:09,180 --> 00:31:10,180 a credit? 445 00:31:10,180 --> 00:31:13,540 The meters don't spin both ways, do they? 446 00:31:13,540 --> 00:31:18,220 >> So we're issuing a credit, but essentially that energy is flowing into our system. 447 00:31:18,220 --> 00:31:23,100 It goes into the big bucket of energy that we provide for our customers. 448 00:31:23,100 --> 00:31:28,100 Obviously we can't track it from one customer to the next, but it is -- it is flowing into 449 00:31:28,100 --> 00:31:29,100 our system. 450 00:31:29,100 --> 00:31:31,560 We're essentially the battery for that customer. 451 00:31:31,560 --> 00:31:35,980 So when it's nighttime, when it's raining, when it's cloudy, when their system's down, 452 00:31:35,980 --> 00:31:40,140 when their house is using more than the capability of their system, DME is there and we have 453 00:31:40,140 --> 00:31:41,620 to be there to provide their load. 454 00:31:41,620 --> 00:31:42,620 >> Okay. 455 00:31:42,620 --> 00:31:47,140 But technically, if my next door neighbor has solar and I don't, and they're producing 456 00:31:47,140 --> 00:31:51,960 more than they're consuming, we're actually consuming some of their excess power? 457 00:31:51,960 --> 00:31:53,300 >> It's going in the bucket. 458 00:31:53,300 --> 00:31:54,300 Yep. 459 00:31:54,300 --> 00:31:55,300 >> It's going right there. 460 00:31:55,300 --> 00:31:56,300 Into the bucket. 461 00:31:56,300 --> 00:31:57,300 >> That's right. 462 00:31:57,300 --> 00:31:58,300 That's right. 463 00:31:58,300 --> 00:31:59,300 >> Yeah. 464 00:31:59,300 --> 00:32:00,300 Okay. 465 00:32:00,300 --> 00:32:03,340 >> I'm not an engineer, so I'm not going to pretend to know the physics here, but yeah, 466 00:32:03,340 --> 00:32:06,620 I think in plain language that's correct. 467 00:32:06,620 --> 00:32:11,460 It's about one megawatt, maybe a little bit more right now total. 468 00:32:11,460 --> 00:32:18,700 That does interplay into our forecast on what we purchase, but because this is intermittent 469 00:32:18,700 --> 00:32:24,740 energy, the reality is we're filling the total load of the city, regardless of what happens, 470 00:32:24,740 --> 00:32:30,420 because at the end of the day, if a customer's solar power does not generate anything, they 471 00:32:30,420 --> 00:32:32,420 still expect DME to be there, right? 472 00:32:32,420 --> 00:32:37,680 So we have to be able to purchase enough load to be able to meet everybody's needs, regardless 473 00:32:37,680 --> 00:32:41,180 of whether it's the customer on the right or the customer on the left. 474 00:32:41,180 --> 00:32:47,420 Do you do some -- I mean, you can put an educated guess together, I bet, of what they're consuming 475 00:32:47,420 --> 00:32:49,860 to the meter, right? 476 00:32:49,860 --> 00:32:50,860 >> Yes, correct. 477 00:32:50,860 --> 00:32:58,300 And so if this customer generated one kilowatt above the thousand that they consumed, then 478 00:32:58,300 --> 00:33:01,740 we see that, and that's the credit that we then give them. 479 00:33:01,740 --> 00:33:02,740 >> Okay. 480 00:33:02,740 --> 00:33:03,740 Okay. 481 00:33:03,740 --> 00:33:10,060 >> And we have access to some customers' inverters where we can actually see how much they generated, 482 00:33:10,060 --> 00:33:12,580 but not all the customers. 483 00:33:12,580 --> 00:33:16,020 >> So we're giving them money back. 484 00:33:16,020 --> 00:33:19,360 Is that the incentive to have solar power? 485 00:33:19,360 --> 00:33:22,500 >> So there's a couple ways to incentivize solar. 486 00:33:22,500 --> 00:33:26,940 One of them is through having a very generous net metering, or in our case, it's a net billing 487 00:33:26,940 --> 00:33:27,940 structure. 488 00:33:27,940 --> 00:33:30,740 And then another way is through rebates. 489 00:33:30,740 --> 00:33:34,060 So we're going to try to address both of those with some of our options moving forward. 490 00:33:34,060 --> 00:33:36,300 But yes, it is a very good incentive. 491 00:33:36,300 --> 00:33:42,320 We're -- of our peer utilities across the state, we're probably one of the most generous 492 00:33:42,320 --> 00:33:45,500 paying utilities back to PV customers. 493 00:33:45,500 --> 00:33:51,120 >> Do they get any incentive to use solar panels when they purchase? 494 00:33:51,120 --> 00:33:52,120 Is there -- 495 00:33:52,120 --> 00:33:56,500 >> So along with our rebate, they can get a solar -- I mean, a federal tax credit for 496 00:33:56,500 --> 00:33:57,500 their system. 497 00:33:57,500 --> 00:33:59,820 Right now, it's 30%. 498 00:33:59,820 --> 00:34:03,420 And also, systems have been coming down in price substantially. 499 00:34:03,420 --> 00:34:08,780 So that's one reason why we don't feel that rebates necessary, and you'll see that in 500 00:34:08,780 --> 00:34:10,580 some of our options moving forward. 501 00:34:10,580 --> 00:34:11,580 >> Okay. 502 00:34:11,580 --> 00:34:12,580 Thank you. 503 00:34:12,580 --> 00:34:13,580 >> All right. 504 00:34:13,580 --> 00:34:20,460 So speaking of options, here's some of the options that we're looking at moving forward. 505 00:34:20,460 --> 00:34:24,800 Option one is pretty much status quo, just leave everything the same. 506 00:34:24,800 --> 00:34:29,980 It would be not a sustainable option for us because of the compounding effect that we're 507 00:34:29,980 --> 00:34:36,860 seeing year and year as more and more systems get brought on to our service territory. 508 00:34:36,860 --> 00:34:41,460 Option two is to sunset the solar rebate, leave everything else the same, but sunset 509 00:34:41,460 --> 00:34:46,860 the solar rebate and instead redirect those funds to our Greensense programs, and we have 510 00:34:46,860 --> 00:34:53,520 Michael Gagne and Catherine Barnett here from our sustainability group, and they can give 511 00:34:53,520 --> 00:34:57,980 you more detail if you'd like on what they have in mind for those dollars, but it would 512 00:34:57,980 --> 00:35:02,980 increase their funding from $500,000 a year to a million dollars a year for those. 513 00:35:02,980 --> 00:35:09,420 Now, it would not address our fixed cost problem that we're having, but it would spend those 514 00:35:09,420 --> 00:35:12,560 dollars more appropriately. 515 00:35:12,560 --> 00:35:17,580 Option three and option four both do the same with the solar rebate, they sunset the solar 516 00:35:17,580 --> 00:35:23,180 rebate, but option three addresses that fixed cost through paying a lower amount for the 517 00:35:23,180 --> 00:35:24,420 energy coming back to us. 518 00:35:24,420 --> 00:35:30,260 So instead of paying our retail 10.6 cents a kilowatt hour, we'd pay our ECA equivalent 519 00:35:30,260 --> 00:35:32,780 or 3.41 cents a kilowatt hour. 520 00:35:32,780 --> 00:35:37,680 So that would help because then we would be paying appropriate amount for the energy coming 521 00:35:37,680 --> 00:35:39,640 back to us. 522 00:35:39,640 --> 00:35:44,860 Option four, which we'll go into a little bit more detail in the next slide too, addresses 523 00:35:44,860 --> 00:35:45,860 it a different way. 524 00:35:45,860 --> 00:35:47,500 It addresses it through the facility charge. 525 00:35:47,500 --> 00:35:54,160 So we'll leave the net billing structure the same, so we'll still pay that retail amount. 526 00:35:54,160 --> 00:35:59,380 We will get rid of the renewable cost adjustment and make it an energy cost adjustment. 527 00:35:59,380 --> 00:36:06,260 So it eliminates that premium that we used to pay or that we currently pay for solar. 528 00:36:06,260 --> 00:36:10,460 But instead ratchets up the facility charge and starts recovering those fixed costs through 529 00:36:10,460 --> 00:36:11,460 the facility charge. 530 00:36:11,460 --> 00:36:17,500 So if I may go to the next slide, you can see that last bullet there. 531 00:36:17,500 --> 00:36:27,420 So starting in FY24, we'll go from 867 to 1945, we'll go another bump in '25 and essentially 532 00:36:27,420 --> 00:36:34,940 get us up to our equivalent fixed cost recovery in FY28 of $62.55. 533 00:36:34,940 --> 00:36:41,020 So regardless of the energy that PV customer uses, that facility charge is going to kick 534 00:36:41,020 --> 00:36:47,500 in and we'll be more apt to recover those fixed costs. 535 00:36:47,500 --> 00:36:52,460 And again, that's paying for the fixed costs of our entire system that right now they're 536 00:36:52,460 --> 00:36:59,980 not paying for the system, basically, that's there to support them when it's cloudy. 537 00:36:59,980 --> 00:37:00,980 Exactly. 538 00:37:00,980 --> 00:37:01,980 Exactly. 539 00:37:01,980 --> 00:37:06,580 We have a fixed cost of our system that we spread across all of our customers, but it's 540 00:37:06,580 --> 00:37:11,540 the customers that typically use energy, the PV customers, that oddity out there that is 541 00:37:11,540 --> 00:37:13,660 actually selling energy back to us. 542 00:37:13,660 --> 00:37:17,100 So they're not paying their fair share. 543 00:37:17,100 --> 00:37:22,300 So Madam Chair, just really quick on the $500,000, a couple of things. 544 00:37:22,300 --> 00:37:30,620 As you may know, the cost of solar panels in the last 10 years has drastically decreased. 545 00:37:30,620 --> 00:37:38,140 So the free market out there has done a much better job than the $500,000 that we offer. 546 00:37:38,140 --> 00:37:42,300 And then the federal government has also increased its credit. 547 00:37:42,300 --> 00:37:45,100 This $500,000 is an annual expenditure to DME. 548 00:37:45,100 --> 00:37:52,900 When we say sunset, all we mean is we discontinue the rebate and we shift those dollars to what 549 00:37:52,900 --> 00:37:55,660 we believe are more effective programs. 550 00:37:55,660 --> 00:38:00,860 The other thing too, roughly in the last two years, we have as many customers that install 551 00:38:00,860 --> 00:38:05,620 rooftop solar without the rebate as we do with the rebate. 552 00:38:05,620 --> 00:38:10,420 And I can tell you, every single one of those customers that does not get a rebate calls 553 00:38:10,420 --> 00:38:15,860 us and complains about the fact that they didn't get the rebate, which is understandable. 554 00:38:15,860 --> 00:38:22,780 But again, I think that the market coupled with what the federal government has done has 555 00:38:22,780 --> 00:38:28,220 certainly had a much bigger impact in people being able to install rooftop solar. 556 00:38:28,220 --> 00:38:34,860 Obviously our very generous payment of that power has also been a huge incentive. 557 00:38:34,860 --> 00:38:41,540 And that's why we're proposing to step into that over a period of time. 558 00:38:41,540 --> 00:38:46,300 And certainly those will be decision points going forward. 559 00:38:46,300 --> 00:38:52,540 We looked at solar energy for a long time because it was so expensive. 560 00:38:52,540 --> 00:39:05,700 And finally got to be what was deemed an acceptable price range when the city got into it. 561 00:39:05,700 --> 00:39:11,580 What amount of non-solar energy rebates are issued every year? 562 00:39:11,580 --> 00:39:14,900 Do we max out that fund every year? 563 00:39:14,900 --> 00:39:15,900 The green sense. 564 00:39:15,900 --> 00:39:22,500 So it's not quite maxed out every year, but I know that they're looking at focusing more 565 00:39:22,500 --> 00:39:27,540 on some of the programs that are more readily taken up by customers. 566 00:39:27,540 --> 00:39:33,420 But Mr. Gagne is here and he can answer anything specifically if you'd like. 567 00:39:33,420 --> 00:39:39,060 So I'm just wondering if we move the half million dollars from solar to green sense 568 00:39:39,060 --> 00:39:48,380 efficiency, if we're only giving out $400,000 in green sense rebates, then increasing the 569 00:39:48,380 --> 00:39:53,700 budget line doesn't increase uptake of energy efficiency? 570 00:39:53,700 --> 00:39:56,700 Well I think he has some ideas in mind. 571 00:39:56,700 --> 00:40:02,820 One is making a bigger impact on low income customers through some new programs. 572 00:40:02,820 --> 00:40:06,980 So but I don't want to steal any of Michael's thunder. 573 00:40:06,980 --> 00:40:08,700 Could you tell us a little bit about that? 574 00:40:08,700 --> 00:40:09,700 Is that another slide? 575 00:40:09,700 --> 00:40:10,700 Yes. 576 00:40:10,700 --> 00:40:11,700 Yeah, I've got some backup slides here. 577 00:40:11,700 --> 00:40:12,700 Okay. 578 00:40:12,700 --> 00:40:13,700 I'll let you get to it. 579 00:40:13,700 --> 00:40:17,100 Well and as Michael's coming up, you know, remember too that, you know, Catherine's coming 580 00:40:17,100 --> 00:40:18,100 up. 581 00:40:18,100 --> 00:40:24,780 But if you remember, we, you know, the city purposely went out and hired a director specific 582 00:40:24,780 --> 00:40:30,500 for environmental service and sustainability to have that renewed focus on that. 583 00:40:30,500 --> 00:40:34,700 What we're planning to do, you know, the green sense, these incentives, even though we've 584 00:40:34,700 --> 00:40:40,700 worked with Catherine and those folks, the idea here is to shift all of that responsibility 585 00:40:40,700 --> 00:40:44,660 for the green sense program over to Michael's group so that they can give it the attention 586 00:40:44,660 --> 00:40:48,140 that it needs because frankly, I think it'd be in a DME. 587 00:40:48,140 --> 00:40:51,260 There's probably a little bit of incentive to not spend some of those dollars to get 588 00:40:51,260 --> 00:40:55,860 the budgetary benefits and so again, we want to shift it to where there's the appropriate 589 00:40:55,860 --> 00:40:59,060 level of attention and I think that's what they're proposing so. 590 00:40:59,060 --> 00:41:02,100 I've got three of your slides loaded. 591 00:41:02,100 --> 00:41:08,340 Catherine, is this your first time you've ever stood in front of the PUB and presented 592 00:41:08,340 --> 00:41:09,340 something? 593 00:41:09,340 --> 00:41:10,340 I believe so. 594 00:41:10,340 --> 00:41:11,340 Probably not in the last 20 years. 595 00:41:11,340 --> 00:41:14,940 I don't think I've presented in the last 20 years maybe. 596 00:41:14,940 --> 00:41:15,940 Maybe 15. 597 00:41:15,940 --> 00:41:16,940 We all know you, of course. 598 00:41:16,940 --> 00:41:19,460 I managed to stay away from it for that long. 599 00:41:19,460 --> 00:41:25,180 No, on the green sense program, we know that there's some room to increase our rebates. 600 00:41:25,180 --> 00:41:30,540 We were expending all of the funds so we ratcheted down the dollar amounts several years ago, 601 00:41:30,540 --> 00:41:35,100 probably four or five years ago now, but we know that we can make some gains there because 602 00:41:35,100 --> 00:41:36,100 of inflation. 603 00:41:36,100 --> 00:41:40,740 We need to increase those numbers so that we're paying a relative percent the same as 604 00:41:40,740 --> 00:41:42,820 we were four years ago. 605 00:41:42,820 --> 00:41:46,820 With the new energy efficiency ratings on the HVAC systems that have just gone into 606 00:41:46,820 --> 00:41:51,300 effect in January, I think that we're going to see some increased costs there as well. 607 00:41:51,300 --> 00:42:02,480 So expanding the HVAC, offering a higher level for a heat pump rebate, windows, insulation. 608 00:42:02,480 --> 00:42:08,380 We were looking at the electric hot water heaters, adding some more rebates that we 609 00:42:08,380 --> 00:42:12,780 haven't had in the past so that we can expend those dollars. 610 00:42:12,780 --> 00:42:15,240 So I'm trying to read that over there. 611 00:42:15,240 --> 00:42:17,140 That's not in the slide deck that I have. 612 00:42:17,140 --> 00:42:24,980 So that's future, I guess, basically it goes up like $100, like 30% up to $500 now, like 613 00:42:24,980 --> 00:42:30,020 30% up to $600, or am I seeing that correctly? 614 00:42:30,020 --> 00:42:35,060 So the energy efficiency is really great. 615 00:42:35,060 --> 00:42:39,780 The cheapest kilowatt is the kilowatt you never have to buy, right? 616 00:42:39,780 --> 00:42:47,020 Lowers our demand, lowers our transmission charges, lowers the median and 90th percentile 617 00:42:47,020 --> 00:42:51,020 load on our distribution transmission equipment, et cetera. 618 00:42:51,020 --> 00:42:54,260 So it's really, really great. 619 00:42:54,260 --> 00:43:00,900 I think my biggest mental challenge I'm having is, so in solar, people are installing systems 620 00:43:00,900 --> 00:43:04,100 for 250 a watt, they're getting 50 cents back or something like that. 621 00:43:04,100 --> 00:43:10,900 They were getting 25% of the value up to a pretty big dollar amount. 622 00:43:10,900 --> 00:43:18,860 Like on windows, I did the arithmetic on the $500 figure, now looking at a $600 figure. 623 00:43:18,860 --> 00:43:20,500 My house has 23 windows. 624 00:43:20,500 --> 00:43:28,900 I got a quote to go to low-E vinyl, modern, efficient windows, and it was basically $800 625 00:43:28,900 --> 00:43:30,120 a window. 626 00:43:30,120 --> 00:43:36,620 So if I replace two windows, I have more than maxed out the rebate. 627 00:43:36,620 --> 00:43:45,260 And so it would take me 11 years to get the full, take full advantage of the rebate, or 628 00:43:45,260 --> 00:43:50,900 I get about a 3% discount on my $16,000 window upgrade. 629 00:43:50,900 --> 00:43:58,380 Air conditioning system, if I'm looking at like an 18 sear heat pump to replace my three 630 00:43:58,380 --> 00:44:03,780 ton, I have two, a three ton and a four ton, but like three tons is really old. 631 00:44:03,780 --> 00:44:10,700 It's $11,000, and I get like a $300, or maybe it's a $400 rebate. 632 00:44:10,700 --> 00:44:20,380 That's 2%, or it's not making me go, gee, I'm going to go from a 13 sear to an 18 sear, 633 00:44:20,380 --> 00:44:21,620 because it's such a tiny amount. 634 00:44:21,620 --> 00:44:26,620 And it's not a homeowner going, man, I can take advantage of this, and over the next 635 00:44:26,620 --> 00:44:31,980 five years, my power bill will be lower, and this rebate will help offset it, especially 636 00:44:31,980 --> 00:44:34,240 lower income. 637 00:44:34,240 --> 00:44:38,380 If you can afford the efficiency, you are going to buy the efficiency anyway. 638 00:44:38,380 --> 00:44:45,380 I wonder if there's, and I realize we don't want to run out of all of the funds in the 639 00:44:45,380 --> 00:44:52,980 first month of the year, but make this more significant, where it might cover 10% or 15% 640 00:44:52,980 --> 00:44:59,380 of these efficiency projects that are the best thing possible for DME and for Denton. 641 00:44:59,380 --> 00:45:03,460 I think we can run some numbers and see what the budget looks like and what we would expend 642 00:45:03,460 --> 00:45:05,460 if we increase those. 643 00:45:05,460 --> 00:45:12,180 And was there, you mentioned, I believe you mentioned targeting for lower income folks 644 00:45:12,180 --> 00:45:17,180 or maybe inefficient, I don't know if there's a way to say like inefficient homes get a 645 00:45:17,180 --> 00:45:21,700 better benefit, or if that's too hard to prove and audit? 646 00:45:21,700 --> 00:45:28,060 Well, we've had some success working with some multifamily properties and doing full 647 00:45:28,060 --> 00:45:36,540 scale insulation, maybe solar screens, not windows, insulation, HVAC rebates, and we've 648 00:45:36,540 --> 00:45:41,580 been earmarking some for multifamily, and we've been expending most of that through 649 00:45:41,580 --> 00:45:42,580 the years. 650 00:45:42,580 --> 00:45:49,100 So I think if we target some of those projects and some low income, and maybe we've looked 651 00:45:49,100 --> 00:45:54,500 at the tiered program based on income, we just have to have staff to verify income, 652 00:45:54,500 --> 00:45:58,220 and that's the hard part, is building those programs and being able to administer every 653 00:45:58,220 --> 00:46:00,500 step of it. 654 00:46:00,500 --> 00:46:03,980 Going forward, you know, if that's what the program looks like, if we have the additional 655 00:46:03,980 --> 00:46:11,460 funding, then we're committed to making that work, but I think there's ways to do it. 656 00:46:11,460 --> 00:46:17,220 We know the areas where we have more inefficient housing in town through our audit program. 657 00:46:17,220 --> 00:46:22,980 We've identified a lot, so there's some communication we can do at the neighborhood level to let 658 00:46:22,980 --> 00:46:25,940 folks know that these programs exist. 659 00:46:25,940 --> 00:46:30,620 Maybe it's landlords that we're reaching out to and letting them know, you know, whenever 660 00:46:30,620 --> 00:46:37,420 I go to a house that has no insulation and a nine sear four ton unit that's on its last 661 00:46:37,420 --> 00:46:41,740 leg and has been for the last three years, you know, there's ways that we can reach out 662 00:46:41,740 --> 00:46:45,940 to those landlords and, you know, make the program available. 663 00:46:45,940 --> 00:46:48,060 I think a couple of things. 664 00:46:48,060 --> 00:46:54,380 What this does is one, if in fact we go this direction, again, this is a summary of some 665 00:46:54,380 --> 00:47:00,420 ideas that this group has, certainly between now and October 1st, when the budget goes 666 00:47:00,420 --> 00:47:04,340 into effect, they would bring forward kind of the specifics about what these programs 667 00:47:04,340 --> 00:47:05,340 may be. 668 00:47:05,340 --> 00:47:09,120 You would have an opportunity to make those kind of, you know, recommendations and changes 669 00:47:09,120 --> 00:47:15,780 to the program, but what this $500,000 does by shifting it here, there's a much broader 670 00:47:15,780 --> 00:47:22,780 number of customers that will have access to this versus somebody being able to install 671 00:47:22,780 --> 00:47:27,940 a $20,000 or $30,000 system on their home. 672 00:47:27,940 --> 00:47:33,660 And let's be honest, some homes in Denton without modifications to their roof are not 673 00:47:33,660 --> 00:47:38,100 going to be able to install a $20,000 or $30,000 system. 674 00:47:38,100 --> 00:47:41,940 The other thing that I'll mention to you is that, you know, many of our customers that 675 00:47:41,940 --> 00:47:46,020 are doing these solar systems, I mean, they're issuing a second mortgage, right? 676 00:47:46,020 --> 00:47:50,540 I mean, they're financing these systems for 20 or 30 years, right? 677 00:47:50,540 --> 00:47:57,180 And so you talk about a 10-year, 11-year payback, I mean, you know, so there's some issues with 678 00:47:57,180 --> 00:48:04,060 that too, but again, by putting it here, it gives access to a much broader base of customers. 679 00:48:04,060 --> 00:48:08,980 And so from a subsidy standpoint, it kind of takes that subsidy issue away because, again, 680 00:48:08,980 --> 00:48:12,460 the same people that are paying for it are the same people that are now have access to 681 00:48:12,460 --> 00:48:14,060 the system versus what we have today. 682 00:48:14,060 --> 00:48:15,060 Yeah. 683 00:48:15,060 --> 00:48:19,940 And I definitely think that this is more democratic and it does incentive, like you said, solar 684 00:48:19,940 --> 00:48:22,960 sells itself already. 685 00:48:22,960 --> 00:48:29,340 The challenge is on the energy efficiency, $300 back on a $10,000 upgrade, which probably 686 00:48:29,340 --> 00:48:33,940 requires a home improvement loan, is not really an incentive. 687 00:48:33,940 --> 00:48:35,340 The people are already making that decision. 688 00:48:35,340 --> 00:48:39,700 So again, you're just giving a little bit of money to the person who's already willing 689 00:48:39,700 --> 00:48:41,280 to do that upgrade. 690 00:48:41,280 --> 00:48:44,460 So I think, I don't know what it would look like, but I would love to see something that 691 00:48:44,460 --> 00:48:52,620 was 10% of, you know, this broad category, 15% up to a total cost of $5,000. 692 00:48:52,620 --> 00:48:55,900 And so if you're, whether you're, or something along those lines, you're doing windows, you're 693 00:48:55,900 --> 00:48:58,140 doing air conditioning, you're doing whatever. 694 00:48:58,140 --> 00:49:02,980 And those have to be efficient, not CER 14, but I don't know, whatever the energy star 695 00:49:02,980 --> 00:49:06,240 for CER 18 or something like that. 696 00:49:06,240 --> 00:49:11,580 And I totally agree that solar has its own economics and doesn't need the subsidy that 697 00:49:11,580 --> 00:49:13,940 it needed whenever it was $8 a lot. 698 00:49:13,940 --> 00:49:14,940 Right. 699 00:49:14,940 --> 00:49:15,940 Right. 700 00:49:15,940 --> 00:49:16,940 So do you have a question? 701 00:49:16,940 --> 00:49:24,260 Well, I don't have a question so much as a comment, but one of the reasons the HVAC 702 00:49:24,260 --> 00:49:29,260 costs so much today is that we can't use the old refrigerants anymore. 703 00:49:29,260 --> 00:49:35,140 So the indoor and the outdoor unit and all the interconnecting piping all out of go. 704 00:49:35,140 --> 00:49:38,780 So it's not an apples and oranges thing. 705 00:49:38,780 --> 00:49:39,780 You're replacing your windows. 706 00:49:39,780 --> 00:49:40,780 It's just the windows. 707 00:49:40,780 --> 00:49:44,060 Well, when you replace your air conditioning system, you have to replace everything having 708 00:49:44,060 --> 00:49:49,620 to do with it, where you could choose to do two windows or seven windows or just the windows 709 00:49:49,620 --> 00:49:53,100 upstairs of the bedroom or, you know, whatever permutation, but you're going to replace the 710 00:49:53,100 --> 00:50:00,500 19-year-old seven and a half unit that's been on its last leg for three years, you're going 711 00:50:00,500 --> 00:50:04,020 to spend $11,000 or $12,000 because you've got to do the whole shooting match. 712 00:50:04,020 --> 00:50:12,300 So maybe the HVAC rebate really isn't much of an incentive, I think, to your point. 713 00:50:12,300 --> 00:50:13,300 Whereas the windows, you've got some flexibility. 714 00:50:13,300 --> 00:50:17,540 You could say, well, I'll just do the windows here or the windows there. 715 00:50:17,540 --> 00:50:18,540 That's right. 716 00:50:18,540 --> 00:50:23,580 The HVAC system, you're kind of -- you're stuck, so it's a real problem. 717 00:50:23,580 --> 00:50:27,700 I don't know about the other programs, the radiant barrier and duct cleaning or duct work 718 00:50:27,700 --> 00:50:33,300 insulation or whatnot, but I know with the units that the cost of replacement has gone 719 00:50:33,300 --> 00:50:36,860 way up because of the requirement to come change out the refrigerants. 720 00:50:36,860 --> 00:50:38,500 So it's had a huge impact. 721 00:50:38,500 --> 00:50:43,940 So as you consider changes to the program and if this money gets shifted over, I would 722 00:50:43,940 --> 00:50:47,780 personally recommend you look at something a little more financially beneficial, maybe 723 00:50:47,780 --> 00:50:50,440 based on Asian sear difference or something. 724 00:50:50,440 --> 00:50:53,380 Like a swimming pool? 725 00:50:53,380 --> 00:50:54,380 Swimming pool. 726 00:50:54,380 --> 00:50:55,380 That'll cool you down. 727 00:50:55,380 --> 00:50:56,380 Oh, yes, sir. 728 00:50:56,380 --> 00:50:57,380 It will. 729 00:50:57,380 --> 00:51:02,620 But if it's a heat pump replacement, it won't heat me up. 730 00:51:02,620 --> 00:51:05,260 And you mentioned about the income verification. 731 00:51:05,260 --> 00:51:11,340 We're already using what's -- the name is escaping me for people who need help with their 732 00:51:11,340 --> 00:51:17,700 bills and they're doing the income -- is there another partnership that we could do there? 733 00:51:17,700 --> 00:51:24,020 There is and I've had talks with Krista Foster about borrowing her list of customers and 734 00:51:24,020 --> 00:51:28,340 taking a look at those bills and seeing where we might be able to do energy efficiency improvements. 735 00:51:28,340 --> 00:51:35,380 So yes, definitely partnership and crossover there. 736 00:51:35,380 --> 00:51:38,740 It always seems like the people who need it the most are the ones who can't afford it. 737 00:51:38,740 --> 00:51:39,740 Right. 738 00:51:39,740 --> 00:51:40,740 Exactly. 739 00:51:40,740 --> 00:51:45,660 If we could somehow get a little balance to that, that would be wonderful. 740 00:51:45,660 --> 00:51:48,220 The other thing too -- Bill's going to come back up here, but the other thing that I'll 741 00:51:48,220 --> 00:51:54,580 mention to the PAB is that we are also taking this same item through the Sustainability 742 00:51:54,580 --> 00:51:56,140 Framework Advisory Committee. 743 00:51:56,140 --> 00:51:57,220 We had one meeting with them. 744 00:51:57,220 --> 00:52:01,500 They asked us questions and we're scheduled to go back to them with this. 745 00:52:01,500 --> 00:52:02,860 So we're kind of running a parallel. 746 00:52:02,860 --> 00:52:07,180 Obviously, these are two independent bodies and so ultimately, whatever recommendation 747 00:52:07,180 --> 00:52:11,060 comes from the PAB, the Sustainability Committee, we will take those and let the council know 748 00:52:11,060 --> 00:52:12,540 what you recommended. 749 00:52:12,540 --> 00:52:13,540 Okay. 750 00:52:13,540 --> 00:52:24,260 Yeah, but to Member Taylor's point, you know, the free ridership is always a tricky thing 751 00:52:24,260 --> 00:52:29,660 to deal with when you're talking about incentives and folks, we have to walk the line between 752 00:52:29,660 --> 00:52:34,880 who's really going to make that decision anyway or who is going to be steered into a more 753 00:52:34,880 --> 00:52:38,980 efficient decision by a few hundred bucks or $1,000. 754 00:52:38,980 --> 00:52:43,180 So it's a tough one because you don't technically want to pay free riders. 755 00:52:43,180 --> 00:52:48,580 You want to pay the folks that are on the fence, so, but I have faith that the sustainability 756 00:52:48,580 --> 00:52:52,860 group will come back with some really good options for those added dollars if they were 757 00:52:52,860 --> 00:52:53,860 to get them. 758 00:52:53,860 --> 00:53:00,820 So with that, you see staff's recommendation as option four is that phased in facility 759 00:53:00,820 --> 00:53:06,540 charge approach and we'd love to get some direction from this board on what you would 760 00:53:06,540 --> 00:53:12,300 like us to bring forward to City Council and have I answered all your questions? 761 00:53:12,300 --> 00:53:13,300 I think so. 762 00:53:13,300 --> 00:53:14,740 Do you have any other questions? 763 00:53:14,740 --> 00:53:15,740 Yeah. 764 00:53:15,740 --> 00:53:24,460 So I was going through the staff report and you were talking about moving to the ECA for 765 00:53:24,460 --> 00:53:25,460 purchase value. 766 00:53:25,460 --> 00:53:26,460 What is it? 767 00:53:26,460 --> 00:53:30,300 Offset value or whatever you want to call it for solar arrays. 768 00:53:30,300 --> 00:53:34,480 I think I have two big concerns about that. 769 00:53:34,480 --> 00:53:37,780 First is some people have taken out 10 or 20 year loans. 770 00:53:37,780 --> 00:53:47,180 They made large financial decisions based on these rates and an expectation of being 771 00:53:47,180 --> 00:53:49,140 able to cover their cost. 772 00:53:49,140 --> 00:53:55,700 So it's a huge shock to say to somebody who took out a home improvement loan last year 773 00:53:55,700 --> 00:54:00,800 and balanced their electric bill and their loan payment to be the same or five percent 774 00:54:00,800 --> 00:54:09,140 cheaper or whatever that okay now we're going to only give you a third of what we said we 775 00:54:09,140 --> 00:54:11,140 were going to give you in credit. 776 00:54:11,140 --> 00:54:16,880 So I think any program that does this would have to have a grace period and a long phase 777 00:54:16,880 --> 00:54:18,260 out for existing customers. 778 00:54:18,260 --> 00:54:24,480 I think maybe not 20 years but it has to be enough where they can see it coming and not 779 00:54:24,480 --> 00:54:30,160 everybody is a wealthy individual in Forest Ridge putting a 20kW array up. 780 00:54:30,160 --> 00:54:36,020 Some people are it was a stretch for them to get the loan and they did it because it 781 00:54:36,020 --> 00:54:38,020 would lower their electric bill. 782 00:54:38,020 --> 00:54:46,580 And so then to be like okay now your electric bill is going up by 30% or 50% or 60%. 783 00:54:46,580 --> 00:54:48,300 That smacks of unfairness to me. 784 00:54:48,300 --> 00:54:58,860 So if we phase out the RCA it has to have some kind of long phase out for existing customers 785 00:54:58,860 --> 00:55:05,820 second on the ECA value is like three cents a kilowatt something like three and a half 786 00:55:05,820 --> 00:55:14,620 or whatever 3.41 per kilowatt hour yeah 3.4 per kilowatt and I you know that that represents 787 00:55:14,620 --> 00:55:20,380 our West Texas wind power and our coastal wind power and solar and that we purchased 788 00:55:20,380 --> 00:55:30,220 and some transmission costs there but whenever I just took the what is it called PV watts 789 00:55:30,220 --> 00:55:38,140 online average output average monthly output for Denton 76201 you know south facing and 790 00:55:38,140 --> 00:55:47,320 I multiplied that times the real-time settlement price in our cot for 2022 and it it was seven 791 00:55:47,320 --> 00:55:54,540 cents a kilowatt hour last year just in what somebody's south-facing rooftop array would 792 00:55:54,540 --> 00:55:57,800 have sold for in the real-time. 793 00:55:57,800 --> 00:56:05,060 So we are undervaluing now 2022 might be an expensive year but want to look at 2021 let's 794 00:56:05,060 --> 00:56:18,580 look at all of 2021 and if we are moving to a paying the actual with the value we need 795 00:56:18,580 --> 00:56:26,340 to pay the actual value so that RTSPP offset is one piece and it's like well maybe we we 796 00:56:26,340 --> 00:56:30,740 already bought solar from West Texas for that house well now we can sell that solar on the 797 00:56:30,740 --> 00:56:37,700 real-time market for that price additionally you mentioned like you don't design for the 798 00:56:37,700 --> 00:56:43,860 for the production of solar in the distribution you design for the maximum load that that 799 00:56:43,860 --> 00:56:49,220 house might have if that systems off but you're all already modeling for about a megawatt 800 00:56:49,220 --> 00:56:55,820 of distributed generation and that does lower distribution costs that doesn't mean you have 801 00:56:55,820 --> 00:57:02,140 less wires and poles and it doesn't mean the one-hour peak hour a year is lower but it 802 00:57:02,140 --> 00:57:07,780 does mean the median the average the 90th percentile hour the 99th percentile hour those 803 00:57:07,780 --> 00:57:12,820 are all lower load and lower wear and tear and less heat on your transformers and so 804 00:57:12,820 --> 00:57:19,660 forth so and there is some t-cost benefit even though it might be minor so I don't feel 805 00:57:19,660 --> 00:57:25,940 it's fair to just say we're going to go with this 3.4 cents because it wouldn't take a 806 00:57:25,940 --> 00:57:33,040 lot of effort to come up with a more reasonable number that really does represent the benefit 807 00:57:33,040 --> 00:57:44,580 to DME in the cost cost have to have a certain amount of remembering that it's a lot cheaper 808 00:57:44,580 --> 00:57:52,820 to produce 400 megawatts than it is to produce one megawatt yeah just the cost of the major 809 00:57:52,820 --> 00:57:57,460 production too I don't know how I don't know how to account for the difference of those 810 00:57:57,460 --> 00:58:03,060 costs but I mean it's a lot like I said it's a lot cheaper you know in my business a lot 811 00:58:03,060 --> 00:58:09,300 cheaper to produce 400,000 tons of hot mix than it is to produce 40,000 tons of hot mix 812 00:58:09,300 --> 00:58:15,380 I had that argument with the city before. So before I before I let Terry come up here 813 00:58:15,380 --> 00:58:18,980 because I think he's chomping at the bit to talk to you about the our renewable market 814 00:58:18,980 --> 00:58:24,780 that we're seeing and how it relates to our customers rooftop so getting back to the customers 815 00:58:24,780 --> 00:58:29,900 that have already made the investment so there was no guarantee when they made that investment 816 00:58:29,900 --> 00:58:33,740 that rate structure would be the same as a matter of fact their interconnection agreement 817 00:58:33,740 --> 00:58:43,060 does state something to that effect but to to look at grandfathering is essentially what 818 00:58:43,060 --> 00:58:48,960 you're saying it's a very tricky thing to do from a billing standpoint and a consistency 819 00:58:48,960 --> 00:58:57,340 standpoint across the the rest of the rate so it's it is something that we need to look 820 00:58:57,340 --> 00:59:05,140 at but I could tell you from a technical standpoint it'd be very very tough to to do from a billing 821 00:59:05,140 --> 00:59:14,740 standpoint. I just wanted to chime in that it might be easier to sell option three to 822 00:59:14,740 --> 00:59:20,020 the general public in so much as it's a wee bit less confusing than option four because 823 00:59:20,020 --> 00:59:25,620 I your your rate ratcheting and you're doing so you know successor generation charge so 824 00:59:25,620 --> 00:59:32,540 forth I think that the phase three although it's less beneficial to DME you know overall 825 00:59:32,540 --> 00:59:36,380 would be a lot easier sell to the public you're just saying okay we're gonna sunset this we're 826 00:59:36,380 --> 00:59:42,460 gonna sunset that and shift that money over a different direction you know over time whatever 827 00:59:42,460 --> 00:59:48,300 that time frame is you know 22 through 23 through 27 or whatever numbers you come up 828 00:59:48,300 --> 00:59:52,700 with but if you tell people you're gonna sunset something and it's just going to end at a 829 00:59:52,700 --> 00:59:58,540 given time or be phased out in a given ramped down rate I think that's a lot easier sell 830 00:59:58,540 --> 01:00:05,980 than option four I think option four is shifting not only shifting burden cost burden but also 831 01:00:05,980 --> 01:00:11,100 shifting it in a way that may be more difficult for average homeowner to understand the benefit 832 01:00:11,100 --> 01:00:17,660 thereof so just suggestion on my part I mean there's a lot of details to this and not really 833 01:00:17,660 --> 01:00:22,380 a bad idea shifting from where the money's going now to where you'd like it to go but 834 01:00:22,380 --> 01:00:26,440 I think it would be an easier sell in option three than it is in option four so that'd 835 01:00:26,440 --> 01:00:31,460 be my okay I have a question then on option four those people being impacted by the phased 836 01:00:31,460 --> 01:00:39,940 in was just the people who have currently who have solar who are not paying their fixed 837 01:00:39,940 --> 01:00:46,940 costs is that correct right we're talking about how many customers there's a little 838 01:00:46,940 --> 01:00:50,740 over a thousand customers that have solar some have varying degrees of what they send 839 01:00:50,740 --> 01:00:57,940 back to us so those thousand customers the low income people who still can't pay their 840 01:00:57,940 --> 01:01:06,180 bills are subsidizing that because they're not paying the fixed costs of the system correct 841 01:01:06,180 --> 01:01:11,460 correct and I think Terry still wants to address member Taylor's comments about the market 842 01:01:11,460 --> 01:01:23,780 yes Terry Nalti assistant general manager so mr. Taylor your your I don't quibble with 843 01:01:23,780 --> 01:01:31,300 your numbers but I do want to take a different perspective because if I were to install a 844 01:01:31,300 --> 01:01:38,360 rooftop solar system on my home I'm installing it primarily to offset the utility expense 845 01:01:38,360 --> 01:01:47,740 that I would pay DME which at 10.8 cents is more than the seven cents that you you stated 846 01:01:47,740 --> 01:01:54,020 so if we're sizing these things correctly to meet our our home peak demands or average 847 01:01:54,020 --> 01:02:00,200 peak demands then the benefits still accrues to the to the homeowner because they're offsetting 848 01:02:00,200 --> 01:02:09,740 their utility bill the other point is that I would make is that in the ECA not only are 849 01:02:09,740 --> 01:02:15,740 you paying the real are we trying to recover our real-time cost of purchase power but we're 850 01:02:15,740 --> 01:02:21,900 also trying to recover the losses that we that we experience from the off-peak wind 851 01:02:21,900 --> 01:02:29,080 energy that we're selling at a loss so if we're buying wind energy for thirty dollars 852 01:02:29,080 --> 01:02:34,780 a megawatt hour under a long-term contract and at two o'clock in the morning the price 853 01:02:34,780 --> 01:02:41,300 is negative five dollars and it's running that's $25 that we have to collect from someone 854 01:02:41,300 --> 01:02:50,900 to cover that expense so the ECA itself is not a a true indicator of what the spot market 855 01:02:50,900 --> 01:03:01,080 price is for electricity also that seven cents that you quoted includes a lot of you know 856 01:03:01,080 --> 01:03:06,380 hours that are high-priced and our studies have shown that and I think Bill included 857 01:03:06,380 --> 01:03:15,300 in in the backup of large long paper on how we see these things perform generally during 858 01:03:15,300 --> 01:03:22,060 those high price periods people are pulling energy to support their their home use air 859 01:03:22,060 --> 01:03:28,060 conditioner cycling on refrigerators whatever and despite the fact that they size the units 860 01:03:28,060 --> 01:03:36,180 to to meet an average household demand during those peak periods they're pulling energy 861 01:03:36,180 --> 01:03:42,800 and I think you know our cost to serve that customer to enable him to to pull that energy 862 01:03:42,800 --> 01:03:52,360 is still sixty two fifty five per month for fixed costs and and so I'm not sure a program 863 01:03:52,360 --> 01:03:58,440 as you had mentioned number one it'd be extremely difficult to administrate as Bill has mentioned 864 01:03:58,440 --> 01:04:04,520 from a billing perspective and number two it doesn't really reflect what our true costs 865 01:04:04,520 --> 01:04:10,180 are with the true value of that surplus energy that's being pushed back into the system really 866 01:04:10,180 --> 01:04:21,020 is it you know theoretically on this side of the room yeah they're they're looking 867 01:04:21,020 --> 01:04:26,900 for some direction oh yeah I don't like I like to that like the simplicity of number 868 01:04:26,900 --> 01:04:34,280 two honestly but threes well my comment would be on the difference thing like option four 869 01:04:34,280 --> 01:04:39,660 and option three if we get sunset out this net billing structure and sunset out the rebate 870 01:04:39,660 --> 01:04:46,260 so we can ship the money we're going to stop having the if we're not paying the net billing 871 01:04:46,260 --> 01:04:51,100 thing then we're going to get back a lot of that revenue we're currently losing if I understood 872 01:04:51,100 --> 01:04:58,140 the thing correctly and that to me is a benefit of two ways one it's easy to understand and 873 01:04:58,140 --> 01:05:03,260 two it's going to increase the revenue that DME receives which will help pay for some 874 01:05:03,260 --> 01:05:08,100 of this fixed costs we're currently not recovering so to me it's a win-win but that's just my 875 01:05:08,100 --> 01:05:14,820 viewpoint on the matter yeah I mean member Ryback makes a great point as a matter of 876 01:05:14,820 --> 01:05:21,100 fact option three was the option we went forward to the sustainability framework advisory committee 877 01:05:21,100 --> 01:05:26,500 to just pay a more appropriate rate for the energy coming back to us that is a rip the 878 01:05:26,500 --> 01:05:32,780 band-aid off approach it ironically doesn't sound like that but it is because what it 879 01:05:32,780 --> 01:05:42,820 does is it directly let me see if I can get to that slide so it directly reduces those 880 01:05:42,820 --> 01:05:49,220 golden bars that you see those that's the net metering credits that we project are going 881 01:05:49,220 --> 01:05:55,420 to happen over the next several years and those are substantial dollars and if we did 882 01:05:55,420 --> 01:06:02,520 pay that 3.4 cents that would go down instantly we would think it's about a $700,000 a year 883 01:06:02,520 --> 01:06:08,300 savings to DME now it's a savings that's that's not a redirecting of funds to green 884 01:06:08,300 --> 01:06:14,300 cents or whatnot that's a savings so yes that is a very effective approach the only caveat 885 01:06:14,300 --> 01:06:20,180 there is as these systems get cheaper as batteries get cheaper more and more folks are going 886 01:06:20,180 --> 01:06:24,820 to go towards the Tesla walls and whatnot and then we won't see any energy coming back 887 01:06:24,820 --> 01:06:32,420 to us so yeah well and again that's that's why we're here is to try to to try to impact 888 01:06:32,420 --> 01:06:39,620 it where's my mouse down here instead of really having a big problem to worry about up there 889 01:06:39,620 --> 01:06:46,580 but if we don't see any energy coming back to us or flowing from us if they get the batteries 890 01:06:46,580 --> 01:06:54,300 then all we have to lean back on then is the facility charge so from a more long-term perspective 891 01:06:54,300 --> 01:07:00,780 it might be a better move well we feel it is a better move to to start impacting that 892 01:07:00,780 --> 01:07:05,500 facility charge and in a phased approach and and this is really you know one of the one 893 01:07:05,500 --> 01:07:09,820 of the reasons why we're addressing this with you is that you know while a million dollars 894 01:07:09,820 --> 01:07:14,940 a day you know you know we could we could probably you know work through that through 895 01:07:14,940 --> 01:07:20,800 our financial processes the reality is by 2028 when it's seven million dollars or potentially 896 01:07:20,800 --> 01:07:27,220 more depending on where this is if there is no change to to the program it'll it'll pose 897 01:07:27,220 --> 01:07:33,820 a real significant financial impact to the fund and again if there is no change that's 898 01:07:33,820 --> 01:07:37,940 okay we just want to make sure that the what the board and the council understand that 899 01:07:37,940 --> 01:07:42,620 by 2028 you know we're talking a significant impact you know and we're talking a rate increase 900 01:07:42,620 --> 01:07:47,620 and the rate increase would be to everybody that does not have rooftop solar under the 901 01:07:47,620 --> 01:07:52,260 current configuration right because any increase that I do yes they're paying more for the 902 01:07:52,260 --> 01:07:57,060 power but they're also getting rebated more as well right and so so if you have rooftop 903 01:07:57,060 --> 01:08:02,360 solar you're you're naturally hedged right you're you're insulated for any rate increases 904 01:08:02,360 --> 01:08:14,580 in the future the way that it's structured today right I could live with three or four 905 01:08:14,580 --> 01:08:26,460 I'm good with that my opinion is four but I I'll live with three I just look at the 906 01:08:26,460 --> 01:08:33,500 longer yeah and and I know the fixed costs of a utility right right now that impact to 907 01:08:33,500 --> 01:08:40,260 the customers and yes it it does feel a little unfair to to your point but there's only a 908 01:08:40,260 --> 01:08:47,260 handful of them now versus four or five years again from here if we kick the can it'll be 909 01:08:47,260 --> 01:08:52,300 several thousand or more that we'll have to deal with pulling that band-aid or starting 910 01:08:52,300 --> 01:08:57,260 a corrective measure yeah I think there's something needs to be done I think but I'm 911 01:08:57,260 --> 01:09:06,020 curious is it a net real-time or net monthly on the it's a net monthly net monthly yeah 912 01:09:06,020 --> 01:09:10,940 so it ebbs and flows throughout the month I mean so the phase four option four is a net 913 01:09:10,940 --> 01:09:17,860 monthly like they can take their power bill to zero their their energy charge to zero 914 01:09:17,860 --> 01:09:22,820 yes they're their energy charge can be zero but then we'll be recovering the facility 915 01:09:22,820 --> 01:09:27,580 charge which will stage up and so this is another interesting question if it costs sixty 916 01:09:27,580 --> 01:09:37,460 dollars sixty-two dollars whatever it was per house then why are the high-use houses subsidizing 917 01:09:37,460 --> 01:09:43,940 the low-use houses like energy-efficient homes are more expensive so a cheap rent house with 918 01:09:43,940 --> 01:09:48,660 no insulation where they've got a three dollar a month electric bill they're subsidizing 919 01:09:48,660 --> 01:09:53,860 the very nice brand-new efficient home on the facility charges because that efficient 920 01:09:53,860 --> 01:09:58,460 home is only paying fifty dollars a month eight nine months of the year all right so 921 01:09:58,460 --> 01:10:03,740 I think if we if we look at if we want to make this fair then and if that is our facility 922 01:10:03,740 --> 01:10:11,620 charge then perhaps our bill is not nine dollars and ten and a half cents it should be sixty 923 01:10:11,620 --> 01:10:18,620 dollars and four cents or whatever whatever that number is would also be like instead 924 01:10:18,620 --> 01:10:23,500 of just saying well solar has to pay all of their facility charges small use high-efficiency 925 01:10:23,500 --> 01:10:30,140 homes you get a pass you know like if that if we want to make our our facility charges 926 01:10:30,140 --> 01:10:37,340 cover all of our infrastructure and then you know incremental incremental energy use is 927 01:10:37,340 --> 01:10:44,700 paid for it because energy is cheap most of the time you know that then that would also 928 01:10:44,700 --> 01:10:50,220 be more fair than you know you did you made a decision five years ago to put solar two 929 01:10:50,220 --> 01:10:54,660 years ago to put solar on your house well now we're gonna we're gonna add fifty dollars 930 01:10:54,660 --> 01:11:00,620 a month to your bill and we're not gonna do the same financial thing that you made the 931 01:11:00,620 --> 01:11:05,660 decision to put solar on your house like well you're touching on a rate maker's nirvana 932 01:11:05,660 --> 01:11:11,820 is to you know actually charge true cost of service and it would be wonderful if if that 933 01:11:11,820 --> 01:11:17,020 facility property taxes than you do right so there's there's cross subsidies that happen 934 01:11:17,020 --> 01:11:21,460 everywhere I mean of course our our business customers are subsidizing our residential 935 01:11:21,460 --> 01:11:25,780 customers they're not quite paying their cost of service either so but those are things 936 01:11:25,780 --> 01:11:32,620 that as rate makers we try to to make little tweaks here and there and adjust but it's 937 01:11:32,620 --> 01:11:37,940 the way the rate structures have been built along the years with utilities and I'm not 938 01:11:37,940 --> 01:11:42,980 gonna I'm gonna say everything but it's the way it's always been done but it's sort of 939 01:11:42,980 --> 01:11:47,660 the way it's always been done there's an assumed load factor by a residential customer class 940 01:11:47,660 --> 01:11:53,020 that that's how we recover some of those fixed costs is through the energy assumptions that 941 01:11:53,020 --> 01:11:58,340 they're gonna be using throughout the year so this is a way to true up the solar piece 942 01:11:58,340 --> 01:12:03,580 but yeah there's still work to be done on the regular rates as well and that and that 943 01:12:03,580 --> 01:12:07,820 discussion regarding all the other customers again we're not picking on solar customers 944 01:12:07,820 --> 01:12:13,380 is this this is just the focus today will be part of that wider rates discussion that 945 01:12:13,380 --> 01:12:19,260 Nick referred to earlier the reality is is that our fixed charge is is too low certainly 946 01:12:19,260 --> 01:12:26,860 comparative to other utilities but certainly compared to what our cost of service is did 947 01:12:26,860 --> 01:12:32,220 you get what you need I think so it sounds like you all are supportive of three or four 948 01:12:32,220 --> 01:12:38,260 essentially trying to address the fixed cost shortfall that we're seeing and in those two 949 01:12:38,260 --> 01:12:44,420 helped to do that and I anticipate I mean obviously we have a another presentation to 950 01:12:44,420 --> 01:12:52,020 make to FSAC and let them know sort of where we're headed but then the ultimate discussion 951 01:12:52,020 --> 01:12:56,220 and decisions could be made by the City Council and you know they'll probably see these same 952 01:12:56,220 --> 01:13:12,180 options and and weigh in all right thank you all right 1054 we are adjourned see when you're 953 01:13:12,180 --> 01:13:26,980 not here I don't get to do