 Good morning. Welcome to the mobility committee meeting. Seeing that we have a quorum present,

00:00:07.900 --> 00:00:13.540
 we'll begin with considering approval of the minutes. I'll entertain a motion. After the

00:00:13.540 --> 00:00:25.980
 minutes of September 11th. Okay. Minutes are approved. I must confess to you that I've

00:00:25.980 --> 00:00:29.940
 been approached a couple of months in a row saying we don't really have any action items

00:00:29.940 --> 00:00:35.440
 is it okay if we don't meet and we're meeting if you're not happy about being here you can

00:00:35.440 --> 00:00:40.280
 blame me because I asked for the agenda items that we're talking about for when we don't

00:00:40.280 --> 00:00:45.420
 have action items that there are things that we can keep making progress on and I'm looking

00:00:45.420 --> 00:00:54.460
 forward to a good discussion. So one of the first ones is item B. Oh, you have to vote

00:00:54.460 --> 00:01:02.800
 on the minutes? Okay. All in favor of approval of the minutes? Aye. Approved. Now item B.

00:01:02.800 --> 00:01:07.440
 If you -- it's to receive a report, hold a discussion, provide direction on the metropolitan

00:01:07.440 --> 00:01:12.240
 transportation plan policy bundle, a program in which applicants can receive transportation

00:01:12.240 --> 00:01:17.020
 development credits. And you may recall that we had this item before and we gave direction

00:01:17.020 --> 00:01:23.360
 that this is a pretty good list of ideas and that we should first of all see if we can

00:01:23.360 --> 00:01:31.760
 meet the requirements, but also in general, you know, keep chipping away at it. Not stopping

00:01:31.760 --> 00:01:36.880
 ourselves necessarily at 10, but just seeing if there are other good ideas we might want

00:01:36.880 --> 00:01:44.320
 to adopt. So anyway, happy to move forward in here. Okay. So my name is -- traffic engineer

00:01:44.320 --> 00:01:50.800
 for the city. I'll be the new staff liaison for this particular committee and -- welcome

00:01:50.800 --> 00:01:56.900
 and congratulations. Thank you. And for this particular item, I would like Katie to present

00:01:56.900 --> 00:02:01.720
 the item and then if there are any discussions, questions, we're more than happy to answer

00:02:01.720 --> 00:02:19.600
 any questions. Can y'all hear me okay? Bring this up. Okay. So we've got -- okay. Good

00:02:19.600 --> 00:02:23.760
 morning, committee members. Thank you for being here today. My name is Katie Welch and

00:02:23.760 --> 00:02:28.120
 I'm from the capital projects department and I'm going to be giving an overview on the

00:02:28.120 --> 00:02:35.280
 metropolitan transportation plan policy bundle. So to begin with an overview of what the program

00:02:35.280 --> 00:02:40.000
 is, the north central Texas council of governments has a metropolitan transportation plan that

00:02:40.000 --> 00:02:46.360
 they call mobility 2045 that lays out a blueprint for how the region will meet the transportation

00:02:46.360 --> 00:02:53.000
 goals and needs over the next 20 plus years. And included in this metropolitan plan are

00:02:53.000 --> 00:02:58.440
 recommended policies, programs, and procedures that they encourage public entities within

00:02:58.440 --> 00:03:04.560
 the DFW area to pursue in order to help meet these needs. The council of governments however

00:03:04.560 --> 00:03:09.120
 knows that infrastructure projects alone are not going to help completely meet the needs

00:03:09.120 --> 00:03:13.480
 and the goals over the next 20 years. So they kind of came up with this program in order

00:03:13.480 --> 00:03:20.280
 to encourage cities to voluntarily adopt these recommended policies. So the way the program

00:03:20.280 --> 00:03:25.660
 works is that applicants who apply, if they meet at least 50% of the policies like you

00:03:25.660 --> 00:03:31.200
 were saying, then they get something called transportation development credits. And what

00:03:31.200 --> 00:03:36.960
 these credits are, are they can be used to help offset local funding matches whenever

00:03:36.960 --> 00:03:41.600
 we have transportation projects that require a local match that are federally funded. So

00:03:41.600 --> 00:03:45.040
 these credits will be used towards the local match and we'll end up saving the city some

00:03:45.040 --> 00:03:51.640
 money on the project throughout construction. So that's just an overview of the program.

00:03:51.640 --> 00:03:56.480
 But today we were going to go into the different policies, where we're at with them, and some

00:03:56.480 --> 00:04:03.040
 next steps on how this application process works. So there's a total of 21 policies in

00:04:03.040 --> 00:04:08.400
 the program. And in order for the city to qualify to get the credits, we have to meet

00:04:08.400 --> 00:04:12.280
 at least 10 of them. And as you can see up here in all of the different colors, these

00:04:12.280 --> 00:04:17.800
 are kind of the categories they span. There's 11 different topic areas that the policies

00:04:17.800 --> 00:04:23.280
 fall into. And the way that we've broken them up to present today are going to be policies

00:04:23.280 --> 00:04:29.120
 that we are currently satisfying in the city and that all we need to do is gather documentation,

00:04:29.120 --> 00:04:33.240
 but we'll be good to go for submission. We have a category of policies that we're most

00:04:33.240 --> 00:04:37.360
 likely satisfying. We need to confirm with the Council of Governments that what we're

00:04:37.360 --> 00:04:42.100
 doing will meet the criteria of what they're expecting, just to make sure when we submit

00:04:42.100 --> 00:04:46.000
 we're not missing anything and we end up not getting the credit for it. So those are ones

00:04:46.000 --> 00:04:50.440
 we have a couple questions on. And then we have a set of policies in this program that

00:04:50.440 --> 00:04:55.920
 we may or may not be already doing as a city and we need to do some further research into

00:04:55.920 --> 00:05:01.320
 in order to see what our next steps will be to fully check them off the list.

00:05:01.320 --> 00:05:06.160
 So we were going to start today with the five policies that we are currently meeting. All

00:05:06.160 --> 00:05:12.720
 we have to do is gather documentation but these are going to be ready to go. They include

00:05:12.720 --> 00:05:17.880
 having a clean fleet policy in place, which we do as a city. Engaging in school siting

00:05:17.880 --> 00:05:23.300
 coordination, which involves the city, local independent school districts, and then TextDOT

00:05:23.300 --> 00:05:27.440
 meeting together to talk about future growth plans, which the city has engaged in. So we've

00:05:27.440 --> 00:05:33.120
 got that one ready. Engaging in storm water management practices for sustainable storm

00:05:33.120 --> 00:05:38.400
 water management. Having transit funding, which means we're contributing to our local

00:05:38.400 --> 00:05:42.520
 transit authority. We do that. So we've got that one check marked. And then having an

00:05:42.520 --> 00:05:47.280
 idling restrictions policy in place, we've got that one good to go as well. And I'm kind

00:05:47.280 --> 00:05:51.440
 of briefly going through these, but if you have any questions about specifics or what

00:05:51.440 --> 00:05:56.680
 more information stop me and we can go into more detail.

00:05:56.680 --> 00:06:02.120
 So these next eight are ones that we're more than likely meeting, but we want to coordinate

00:06:02.120 --> 00:06:06.120
 and confirm with council of governments that what we're doing meets their requirements.

00:06:06.120 --> 00:06:11.960
 So I was going to briefly read through these. We've got copper theft, parking management,

00:06:11.960 --> 00:06:18.120
 safe access to schools, railroad safety, land use strategies, clean construction, complete

00:06:18.120 --> 00:06:24.060
 streets policy, and something they call transit funding level two. The good news is that if

00:06:24.060 --> 00:06:28.560
 we get confirmation that we're meeting these eight, that puts us at 13, which means we've

00:06:28.560 --> 00:06:35.800
 got the 10 required ones off check marked off and are above the 50% threshold. So next

00:06:35.800 --> 00:06:38.800
 steps are really going to be confirming that we've got these. And I think that will get

00:06:38.800 --> 00:06:42.720
 us through the finish line for the application.

00:06:42.720 --> 00:06:52.840
 So if we meet more than the 50%, say 13, say we end up getting 20, do we get any more funding?

00:06:52.840 --> 00:06:57.040
 I was wondering that too. That's something I need to confirm with council of governments

00:06:57.040 --> 00:07:00.640
 because I was thinking that would be good if it worked that way. So I can get back to

00:07:00.640 --> 00:07:07.960
 you on that. Any other questions on this slide in particular?

00:07:07.960 --> 00:07:14.560
 >> Seeing none.

00:07:14.560 --> 00:07:19.760
 >> And then these last eight policies are going to be ones that we're saying we may or may

00:07:19.760 --> 00:07:25.800
 not meet. Really what that means is we either have partial activities in place that are

00:07:25.800 --> 00:07:29.160
 going towards these policies or we don't have anything at all, but we need to do some more

00:07:29.160 --> 00:07:34.480
 internal research within the city to see what we're doing, work with cog to figure out what

00:07:34.480 --> 00:07:38.040
 our next steps are going to be and kind of get a timeline in place to see if we'll get

00:07:38.040 --> 00:07:43.400
 these before the April deadline, which I'll get to in the next slide. So these are going

00:07:43.400 --> 00:07:50.920
 to be urban thoroughfare revitalization, traffic integration, traffic incident management,

00:07:50.920 --> 00:07:56.760
 city oriented development, wrong way driving policies, securing transportation infrastructure,

00:07:56.760 --> 00:08:03.440
 employer trip reduction program and unmanned aircraft system policies. So these eight,

00:08:03.440 --> 00:08:08.180
 some of the next steps for these are going to be determining next steps for what will

00:08:08.180 --> 00:08:12.800
 make these whole and then kind of prioritizing which ones we want to pursue and working with

00:08:12.800 --> 00:08:17.360
 the committee to see which ones we're interested in, what we want to try to get on our application

00:08:17.360 --> 00:08:19.320
 for the spring deadline.

00:08:19.320 --> 00:08:23.760
 I thought I remember hearing in one or another legislative briefing that unmanned aircraft

00:08:23.760 --> 00:08:28.600
 systems are going to be regulated at other than local level.

00:08:28.600 --> 00:08:33.400
 You know, it's interesting you say that because someone had mentioned to me that this one

00:08:33.400 --> 00:08:40.500
 may or may not stay on this list for the 2019 policy bundle program. This is, they haven't

00:08:40.500 --> 00:08:44.160
 released the official application yet, so this is kind of information we have working

00:08:44.160 --> 00:08:50.280
 with them up until that point. So that actually may be why someone had said that. So that's

00:08:50.280 --> 00:08:55.440
 good to know. They said they should be releasing the official list in the next couple weeks

00:08:55.440 --> 00:09:01.240
 and that everything will stay the same except that one may or may not be on there.

00:09:01.240 --> 00:09:07.440
 So we can provide an update once we get the official list.

00:09:07.440 --> 00:09:15.520
 So going on to the schedule for this application process, so within sometime this month of

00:09:15.520 --> 00:09:20.000
 November we should be receiving the application. We've sent in our request, so as soon as they're

00:09:20.000 --> 00:09:25.680
 ready to release we'll be on the list to get the application. And it will be due in spring

00:09:25.680 --> 00:09:31.960
 of 2019. They haven't released the official due date yet, but they, in talking with Council

00:09:31.960 --> 00:09:37.000
 of Governments, they said that more than likely March 2019 will be the early deadline, April

00:09:37.000 --> 00:09:42.320
 will be the final deadline, so it gives us a month to submit and then have any questions

00:09:42.320 --> 00:09:48.960
 addressed if there's any problems with our application. So that's kind of what they're

00:09:48.960 --> 00:09:53.920
 saying is going to be the schedule as of now. And so in the meantime, what our next steps

00:09:53.920 --> 00:09:58.800
 are going to be between now and spring is finalizing the documentation on the five that

00:09:58.800 --> 00:10:04.040
 we know we're meeting, working with Council of Governments to confirm the eight that we're

00:10:04.040 --> 00:10:07.880
 pretty positive we're meeting, tying up any loose ends, if there's anything we may be

00:10:07.880 --> 00:10:13.920
 short on, gathering that documentation, and then those last eight that we have, determining

00:10:13.920 --> 00:10:17.560
 next steps and kind of prioritizing which ones we want to try to get on that application

00:10:17.560 --> 00:10:25.600
 as well. So we'll submit in spring. They said it'll take a couple of months to review applications,

00:10:25.600 --> 00:10:30.800
 determine funding levels, but around May of '19 we can start talking with the Council

00:10:30.800 --> 00:10:35.200
 of Governments about which transportation project or projects we want to use these credits

00:10:35.200 --> 00:10:42.760
 towards and start getting that on their radar. So that'll be the process. And that's what

00:10:42.760 --> 00:10:45.280
 I have for you.

00:10:45.280 --> 00:10:51.760
 On the process, because I do see, and I know that some of these items are from various

00:10:51.760 --> 00:10:59.520
 departments, so will the responsible department be the one that is going to reach out and

00:10:59.520 --> 00:11:04.200
 see if that qualifies, or is there going to be one person in charge of the application

00:11:04.200 --> 00:11:08.480
 doing all of these things, just for clarity?

00:11:08.480 --> 00:11:13.040
 It's going to be one person in charge of the overall application, coordinating with the

00:11:13.040 --> 00:11:18.160
 internal departments, coordinating with COG, and making sure all of our loose ends are

00:11:18.160 --> 00:11:23.160
 tied up and everything we have is together. So there'll be staff contacts, but one person

00:11:23.160 --> 00:11:24.160
 managing the information.

00:11:24.160 --> 00:11:28.320
 Yes, there will be one project manager that keeps tabs on everything. That way you're

00:11:28.320 --> 00:11:32.320
 not lost in translation pretty much.

00:11:32.320 --> 00:11:38.320
 Right. And so my follow-up question to that, if there is something within the eight that

00:11:38.320 --> 00:11:44.400
 we think we are, will there be plenty of time to get those documents or policies to Council

00:11:44.400 --> 00:11:51.920
 for update or amendments if there's something that we need to change?

00:11:51.920 --> 00:11:56.480
 That's a good question. There may be time. We're going to assess through December, so

00:11:56.480 --> 00:12:02.120
 we do have three months to get it on the agenda and see if there are some ordinances that

00:12:02.120 --> 00:12:07.200
 are required to put this in place, to get us across the line, at least for the first

00:12:07.200 --> 00:12:11.480
 hand. Definitely we'll make an effort to get it done.

00:12:11.480 --> 00:12:15.960
 I do think in the next couple of weeks we're really going to hit hard on working with Council

00:12:15.960 --> 00:12:20.440
 of Governments to determine next steps. So ordinances we have in place right now that

00:12:20.440 --> 00:12:25.440
 we think are from 2015, for example, that we think will get us there. If we find out

00:12:25.440 --> 00:12:32.960
 otherwise, we'll make sure to prioritize that as one of the first things we do.

00:12:32.960 --> 00:12:40.640
 So clearly to respond to the incentive, your priority is clearing the five and then the

00:12:40.640 --> 00:12:49.000
 eight, and we can lose three and still secure the credits. But what I hoped that we might

00:12:49.000 --> 00:12:58.520
 do in this session is to see among us, staff and the committee, see if the others that

00:12:58.520 --> 00:13:02.800
 are the ones that just on their own merits, we just think are good ideas worth pursuing,

00:13:02.800 --> 00:13:06.520
 and maybe if there's some that we feel more strongly about than others.

00:13:06.520 --> 00:13:09.800
 So you're talking about the last eight that we're talking about. Can you pull up the

00:13:09.800 --> 00:13:13.600
 slides so that we can... Because we've previously given direction

00:13:13.600 --> 00:13:18.720
 that yeah, if there's things we already meet and we can get money, we're in favor of that.

00:13:18.720 --> 00:13:25.560
 So this is beyond that. Are these good ideas that we would just like to take as suggestions?

00:13:25.560 --> 00:13:29.360
 We can go through these if you want and give you an update on where we're at with each

00:13:29.360 --> 00:13:35.920
 of these eight. We've got some notes on partial activities we're doing. So if we want to start

00:13:35.920 --> 00:13:40.600
 with the urban thoroughfare revitalization... Maybe if you wouldn't mind touching on sort

00:13:40.600 --> 00:13:45.240
 of what's the objective of each one? Of each one, yes. Okay. So for this first

00:13:45.240 --> 00:13:50.960
 one, it's implement land use and transportation programs and policies to revitalize and redevelop

00:13:50.960 --> 00:13:55.840
 aging infrastructure to provide context-sensitive solutions for urban thoroughfares on the state

00:13:55.840 --> 00:14:00.120
 roadway systems and other important community roadways is the description they give.

00:14:00.120 --> 00:14:01.880
 Yeah, what does that mean? I know.

00:14:01.880 --> 00:14:06.160
 Context-sensitive... So quick answer to that one. It's a pretty

00:14:06.160 --> 00:14:13.320
 long discussion, but are we communicating or integrating our transportation solutions

00:14:13.320 --> 00:14:19.880
 with the land use? That's the bigger picture. Are we working with the development community

00:14:19.880 --> 00:14:25.240
 and with our planning department so that we have the right type of mix of land uses that

00:14:25.240 --> 00:14:33.880
 contributes towards the transportation system that exists? In a sense, if you have a Elmond

00:14:33.880 --> 00:14:40.080
 Locust, in future, whenever development comes along that street, when we're planning Elmond

00:14:40.080 --> 00:14:45.600
 Locust, can we plan bike lanes or can we plan wider sidewalks with the new development and

00:14:45.600 --> 00:14:51.080
 land use coming in place? So that's... Are you taking big picture and making sure that

00:14:51.080 --> 00:14:56.920
 all your land uses and the transportation system lines up? That's the context-sensitive

00:14:56.920 --> 00:15:00.320
 nature of the design. So what would count as evidence of our doing

00:15:00.320 --> 00:15:03.080
 that? And so the reason this is one that we need

00:15:03.080 --> 00:15:08.320
 to do a little further research on is we have mention of context-sensitive solutions in our

00:15:08.320 --> 00:15:15.000
 comprehensive plan, the Denton 2030 plan, and then we also redevelop our aging infrastructure.

00:15:15.000 --> 00:15:18.900
 A lot of our capital projects are doing that right now. So what we need to do is work with

00:15:18.900 --> 00:15:23.560
 development services and see if we have any formal policies in place. I believe this is

00:15:23.560 --> 00:15:29.640
 one that needs governing body approval, so something that's been approved by our council,

00:15:29.640 --> 00:15:33.200
 our comprehensive plan has. So it's just going to be a little more coordination with development

00:15:33.200 --> 00:15:39.200
 services, determining what they're doing, working with council of governments to determine

00:15:39.200 --> 00:15:44.120
 does this meet the criteria? So a bit more research than that previous eight that you

00:15:44.120 --> 00:15:48.160
 had seen up there. So on the engineering side, we did take to

00:15:48.160 --> 00:15:54.240
 council our transportation criteria manuals, and that really ties the complete street portion

00:15:54.240 --> 00:16:00.480
 on the transportation side. So yes, we have some components on the development services

00:16:00.480 --> 00:16:05.760
 side and some components in the transportation side. All we have to do at this point is are

00:16:05.760 --> 00:16:10.960
 these enough and fit the CAWC criteria? That's the only thing that we're going to look into

00:16:10.960 --> 00:16:16.880
 and see if they're accepting that. If not, then if there is a formal ordinance or what

00:16:16.880 --> 00:16:21.040
 is required, and that's why this is on this list where we don't know yet. We don't have

00:16:21.040 --> 00:16:24.040
 enough information to make that decision. >> Any other questions?

00:16:24.040 --> 00:16:28.800
 >> Well, just more of a comment, that we are also working on the zoning map update, which

00:16:28.800 --> 00:16:33.560
 kind of when you see thoroughfare revitalization, it feels like that kind of hits on that a

00:16:33.560 --> 00:16:39.280
 little bit, and so I don't know if that would -- if that needs to be passed or not ahead

00:16:39.280 --> 00:16:41.880
 of time. >> Do you have a comment, Todd?

00:16:41.880 --> 00:16:46.480
 >> So to go in line with what you're saying, part of what goes with the zoning update is

00:16:46.480 --> 00:16:52.100
 the master thoroughfare plan that we're creating and updating this year. That would be a big

00:16:52.100 --> 00:16:55.680
 component of that, because that's really where you address the context-sensitive nature of

00:16:55.680 --> 00:17:00.720
 these corridors, as you specifically stated in that plan. This is the process we'll utilize

00:17:00.720 --> 00:17:04.960
 for design as we go through putting these projects in the ground, and you lay out the

00:17:04.960 --> 00:17:08.480
 groundwork for what does that look like. So we'll visit those cross-sections and what

00:17:08.480 --> 00:17:14.560
 do they look like, not from an engineering sense but from a true visual and contextual

00:17:14.560 --> 00:17:17.960
 sense, what are those elements, what are some examples, how does that get rolled in, and

00:17:17.960 --> 00:17:23.240
 then that would go back to council for approval. >> So it's kind of like the complete streets

00:17:23.240 --> 00:17:25.980
 objective? >> It is. It is absolutely the complete streets

00:17:25.980 --> 00:17:28.720
 objective. >> Okay. So part of what I'm listening for

00:17:28.720 --> 00:17:32.760
 is to describe these as, you know, will it actually lead us to -- like, we don't need

00:17:32.760 --> 00:17:36.680
 extra brownie points, but will it lead us to do something different that, you know,

00:17:36.680 --> 00:17:40.920
 is constructive and sounds like it would, and that's actually one of our eight things

00:17:40.920 --> 00:17:46.240
 we agreed to work on, you know, through a treat, so, okay.

00:17:46.240 --> 00:17:47.240
 >> Awesome. >> Carry on.

00:17:47.240 --> 00:17:52.200
 >> Okay. So the next one we have is called integration.

00:17:52.200 --> 00:17:57.400
 What this has to do with is integrating all of our traffic operation systems between public

00:17:57.400 --> 00:18:01.600
 sector entities, including the sharing of data and video is the description they give

00:18:01.600 --> 00:18:07.520
 for this particular policy. So the thing that we are currently doing that

00:18:07.520 --> 00:18:12.320
 we think may get us a check mark on this one is the Waze initiative.

00:18:12.320 --> 00:18:16.080
 We are currently right now with that kind of looking at the risk assessment of data

00:18:16.080 --> 00:18:20.200
 sharing with -- through this Waze program and are going to be working with our risk

00:18:20.200 --> 00:18:25.880
 management and legal team to kind of get a risk management plan in place, but we're thinking

00:18:25.880 --> 00:18:31.120
 that may be what we can end up pursuing to check this one off.

00:18:31.120 --> 00:18:36.040
 >> But again, not in terms of, like, the brownie points, because the checking off doesn't benefit

00:18:36.040 --> 00:18:45.320
 us anymore, but in terms of the substantive, you know, policy benefit, it's what this might

00:18:45.320 --> 00:18:50.280
 spark us to do. This is all a question, like, did I understand

00:18:50.280 --> 00:18:51.280
 you. The thing we might be doing is integrating

00:18:51.280 --> 00:18:52.280
 with Waze. >> Yes.

00:18:52.280 --> 00:18:57.240
 And sharing traffic data both ways. >> Some of the other things that we're doing

00:18:57.240 --> 00:19:01.400
 that would fall under the same category is we build out our fiber optic network with

00:19:01.400 --> 00:19:06.520
 IT. We integrate all of our signals with that.

00:19:06.520 --> 00:19:10.120
 That in and of itself wouldn't get you there, but what it does is the agreement we have

00:19:10.120 --> 00:19:14.800
 with TechStop where we'll integrate their system with our system so that they can see

00:19:14.800 --> 00:19:18.560
 the corridors along I-35. Most communities have some kind of arrangement

00:19:18.560 --> 00:19:21.520
 along the interstate system where they're already doing that.

00:19:21.520 --> 00:19:25.320
 So items of that nature would also come into play here.

00:19:25.320 --> 00:19:29.880
 We're also looking at, you know, another potential would be with the rail system as we put in

00:19:29.880 --> 00:19:35.000
 quiet zones, we also put in video and audio monitoring so that we can actively understand

00:19:35.000 --> 00:19:38.000
 when the horns are blown. That would be something we'd add into that

00:19:38.000 --> 00:19:41.840
 system as well. >> Okay.

00:19:41.840 --> 00:19:45.520
 So the next one is going to be traffic incident management.

00:19:45.520 --> 00:19:49.720
 This one is implementing comprehensive and coordinated approaches to traffic incident

00:19:49.720 --> 00:19:54.360
 management. And they say requiring a comprehensive coordinated

00:19:54.360 --> 00:19:59.520
 interagency approach to traffic incident management in the North Texas region, including tracking

00:19:59.520 --> 00:20:05.900
 performance measures based on regional definitions, collecting data and monitoring progress.

00:20:05.900 --> 00:20:10.240
 This applies to local governments, they say, that responds to freeway incidents.

00:20:10.240 --> 00:20:14.860
 >> So Todd started talking about this. This is coordinated with TechStop and making

00:20:14.860 --> 00:20:22.440
 sure us as a local government responding to emergency, you know, services or, you know,

00:20:22.440 --> 00:20:31.440
 accidents or any of the -- anything on the freeways or the TechStop highways, how prepared

00:20:31.440 --> 00:20:37.000
 are we and what is our plan and how do we communicate in an efficient way?

00:20:37.000 --> 00:20:42.400
 So putting that traffic management center, connecting it through fiber, monitoring it,

00:20:42.400 --> 00:20:46.440
 once we have that in place, we're already working towards it, and then we can better

00:20:46.440 --> 00:20:52.200
 communicate with TechStop and/or other cities that are responding to the same incident on

00:20:52.200 --> 00:20:59.280
 the border or somewhere in the whole region. So yeah, at some point we will address this,

00:20:59.280 --> 00:21:03.160
 but with the traffic management center not ready, we're not there yet, but definitely

00:21:03.160 --> 00:21:09.880
 we're working on this. >> The next one is freight-oriented development.

00:21:09.880 --> 00:21:16.080
 So this is in regards to enhancing freight-oriented land use sustainability by requiring local

00:21:16.080 --> 00:21:22.400
 governments to adopt compatible zoning requirements in properties adjacent to freight-oriented

00:21:22.400 --> 00:21:26.760
 development areas. >> And what is the goal of the freight, you

00:21:26.760 --> 00:21:34.680
 know, focus in this? >> So this is more in line of -- when you're

00:21:34.680 --> 00:21:40.800
 looking at a transportation system overall, one of the largest components is freight.

00:21:40.800 --> 00:21:46.000
 How do you deliver goods? Are you using rail, which is one of the major

00:21:46.000 --> 00:21:54.240
 ones, air, water, or the last one is roadways? So if you're really dependent on the roadway

00:21:54.240 --> 00:21:59.800
 system and truck traffic to deliver that kind of goods, that means you're not really better

00:21:59.800 --> 00:22:06.800
 planning or differentiating or making an effort to have a full, complete street segment in

00:22:06.800 --> 00:22:09.880
 there. So you're more focused on delivering goods

00:22:09.880 --> 00:22:17.080
 through a street network, but on our end, what they want to see, and most of these local

00:22:17.080 --> 00:22:22.080
 agencies do, is do they have a freight plan? Do they have different options for freight?

00:22:22.080 --> 00:22:27.360
 How are they addressing that? So we do have some type of land use and freight

00:22:27.360 --> 00:22:32.520
 integration on our west side of the city by the airport where there are railroads coming

00:22:32.520 --> 00:22:36.800
 in, there are connections, nodes, as well as the airport is right there, and then our

00:22:36.800 --> 00:22:43.100
 land use lends to it as far as warehousing, manufacturing, industrial, that helps integrate

00:22:43.100 --> 00:22:48.800
 that piece, and we're planning in that direction. So that becomes our freight area and freight

00:22:48.800 --> 00:22:55.760
 corridor, and that's separate from our entire other operations and other use of our street

00:22:55.760 --> 00:22:58.880
 network. >> Take pressure off of the street network.

00:22:58.880 --> 00:23:05.680
 >> Correct. >> So the next one is wrongway driving.

00:23:05.680 --> 00:23:12.080
 This is basically having these policies in place that prevent wrongway driving accidents,

00:23:12.080 --> 00:23:16.840
 and one thing that we need to do further research on is work with our police department to kind

00:23:16.840 --> 00:23:21.120
 of get some data on the past eight to ten years, how many wrongway driving accidents

00:23:21.120 --> 00:23:25.360
 have we had? Do we have policies in place already that are preventing this? Mechanisms

00:23:25.360 --> 00:23:31.720
 in place that are preventing this? So that was going to be our next steps on this item.

00:23:31.720 --> 00:23:34.600
 >> Wouldn't getting rid of one-way streets fix that?

00:23:34.600 --> 00:23:44.680
 >> Actually, this policy is more focused on freeways and roadways, more so than local

00:23:44.680 --> 00:23:52.040
 streets. Our internal arterials are not so much the target. It's more of the crashes

00:23:52.040 --> 00:23:57.040
 that occur on highways and freeways, where the speeds are really high if you get in the

00:23:57.040 --> 00:24:02.120
 wrong direction, and what are the different things that you're doing to prevent that at

00:24:02.120 --> 00:24:08.880
 the ramps, on ramps, and that's the real focus of this particular one.

00:24:08.880 --> 00:24:15.920
 >> So not Oak Street? Okay.

00:24:15.920 --> 00:24:21.080
 >> The next policy is going to be securing transportation infrastructure. What this one

00:24:21.080 --> 00:24:27.440
 focuses on is are we participating regionally in the identification and development of a

00:24:27.440 --> 00:24:32.920
 security plan for the top ten regionally identified transportation infrastructure components is

00:24:32.920 --> 00:24:37.760
 the description they give. So basically, are we coordinating regionally in helping contribute

00:24:37.760 --> 00:24:46.960
 input to a plan for securing our major transportation mechanisms throughout the region? And so we

00:24:46.960 --> 00:24:50.800
 need to speak with council of governments and kind of see what opportunities are out

00:24:50.800 --> 00:24:55.520
 there. We haven't really had that conversation yet, so that's the next steps for that particular

00:24:55.520 --> 00:24:58.560
 item. Did you have anything to add on that one?

00:24:58.560 --> 00:25:04.480
 >> No, I think that's pretty simple. >> The next second to last is employer trip

00:25:04.480 --> 00:25:11.160
 reduction program. This is basically working with council of governments to have some education

00:25:11.160 --> 00:25:16.980
 programs here within the city to encourage employee trip sharing, ride sharing to work.

00:25:16.980 --> 00:25:20.080
 And so that's just another one that we need to reach out to council of governments and

00:25:20.080 --> 00:25:27.840
 see what opportunities are out there for us. >> I would also recommend our economic development

00:25:27.840 --> 00:25:35.440
 department and we also have the economic development board who has the chamber and the university

00:25:35.440 --> 00:25:40.800
 and a lot of the high employers sitting on the board, and so getting some information

00:25:40.800 --> 00:25:46.200
 out to them may be a good start as well, the way to get that out into the community.

00:25:46.200 --> 00:25:52.800
 >> Okay. Thank you. And then -- oh, yes. >> I was going to say on the employer trip

00:25:52.800 --> 00:25:58.120
 reduction program, I'm not sure if the program that DCTA has just recently started out by

00:25:58.120 --> 00:26:02.600
 the airport -- on airport road would qualify for that or not, but it's a possibility.

00:26:02.600 --> 00:26:09.000
 >> That's something that we are checking with Cog. I thought it did, but we'll see. It does

00:26:09.000 --> 00:26:13.120
 look into how can we reduce the number of people that are taking cars into that particular

00:26:13.120 --> 00:26:20.200
 area, so it does have some -- >> So of these -- we'll leave the last one

00:26:20.200 --> 00:26:23.520
 off, right, because we don't know if it's going to stay on.

00:26:23.520 --> 00:26:25.960
 >> Oh, yeah, that's true. >> But, you know, so these -- the ones that

00:26:25.960 --> 00:26:32.800
 -- how can we help you -- well, first of all, do we, you know, like this list? You know,

00:26:32.800 --> 00:26:36.720
 are these things that we actually want to work on? And then which of these actually

00:26:36.720 --> 00:26:42.200
 require some new policy development? From what I'm hearing, like, yes, the first one

00:26:42.200 --> 00:26:46.480
 is complete streets, integration is the ways thing, so you might need to be bringing that

00:26:46.480 --> 00:26:53.440
 back to us. And sounds like employer trip production program would be a new thing. The

00:26:53.440 --> 00:26:58.360
 others are -- this is all a question. The others, it sounds like it's more a question

00:26:58.360 --> 00:27:03.720
 of seeing if we happen to be aligning with what they're interested in anyway to get extra

00:27:03.720 --> 00:27:12.280
 points, but, you know, where can we help you by giving direction on policy for something

00:27:12.280 --> 00:27:15.320
 new that you weren't already doing? Is there anything?

00:27:15.320 --> 00:27:20.720
 >> I think the employer trip production program is something that we need to look into. Definitely

00:27:20.720 --> 00:27:27.000
 we need more research time to get -- understand what's required and what are the policy implications

00:27:27.000 --> 00:27:31.320
 so that we have better understanding out of these eight. There are five that really need

00:27:31.320 --> 00:27:36.480
 a council action or really need a policy in this initiative that's lacking within the

00:27:36.480 --> 00:27:44.240
 city. Once we get to that phase, I think at a later date, most likely around February

00:27:44.240 --> 00:27:49.240
 timeframe, we can have a better idea on these. Obviously we'll have a better idea of the

00:27:49.240 --> 00:27:53.880
 remaining eight and move forward with that part, but these will have a better idea and

00:27:53.880 --> 00:28:00.520
 research to complete it so that by the time we apply, we're already working on these.

00:28:00.520 --> 00:28:05.700
 Better idea would be bring it back and say these are the five that we need more direction

00:28:05.700 --> 00:28:09.840
 from the council. >> I just want to add here that a lot of these

00:28:09.840 --> 00:28:17.320
 that we see would make our air quality better. And so I am in favor and a proponent of that,

00:28:17.320 --> 00:28:22.280
 and I think it would just -- a lot of these implement in our key focus areas across the

00:28:22.280 --> 00:28:28.320
 city as well. >> There's double benefits to both reasons

00:28:28.320 --> 00:28:35.300
 to do the policy. >> To the extent that we're beyond the requirements

00:28:35.300 --> 00:28:42.320
 for the credits, you know, I personally wouldn't feel all that constrained to make sure that

00:28:42.320 --> 00:28:47.720
 it meets what NCT cog wants. That's a good thing, I guess. But if we want to do something

00:28:47.720 --> 00:28:53.080
 that we think is better or, you know, I don't feel we need to feel constrained by them,

00:28:53.080 --> 00:28:59.280
 it's just, you know, we can feel inspired by them by seeing their list. But, you know,

00:28:59.280 --> 00:29:03.520
 I think it's more important that we do what we think is great policy for Denton than that

00:29:03.520 --> 00:29:12.320
 we necessarily check the box on these. >> I would agree with that statement and I'd

00:29:12.320 --> 00:29:18.560
 say the other thing is there are more than just this policy bundle that these particular

00:29:18.560 --> 00:29:28.520
 items affect at cog. There are other recognitions that go out that we can apply for. It's not

00:29:28.520 --> 00:29:34.400
 just trying to get these transportation credits that these affect. They affect many things

00:29:34.400 --> 00:29:40.720
 across the board at that level. >> So have you gotten what's gettable today

00:29:40.720 --> 00:29:42.920
 that would be helpful in moving forward? >> Yeah, definitely.

00:29:42.920 --> 00:29:44.880
 >> We'll sit tight and wait for you to come back?

00:29:44.880 --> 00:29:47.240
 >> Definitely. >> Yeah, thanks so much for reviewing this.

00:29:47.240 --> 00:29:50.040
 Have you presented to us before? >> This is my first time.

00:29:50.040 --> 00:29:53.000
 >> This is your maiden voyage? >> Yes, thank you for your time today.

00:29:53.000 --> 00:29:55.520
 >> Congratulations. >> Thank you. I appreciate that.

00:29:55.520 --> 00:30:02.920
 >> I'm going to go ahead and escape out of this. Are you up next?

00:30:02.920 --> 00:30:12.080
 >> Okay. So we'll close out that item and move on to item C. And this is another one

00:30:12.080 --> 00:30:21.000
 where you're here because I've held you hostage. You know, my request to Preetam was that we

00:30:21.000 --> 00:30:26.400
 -- especially when we don't have other pressing matters, look quarter by quarter or six months

00:30:26.400 --> 00:30:33.400
 by six months at the confluence of text odd plan projects and our plan projects to see

00:30:33.400 --> 00:30:37.840
 where, you know, there might be problems that we should be communicating about or that we

00:30:37.840 --> 00:30:41.520
 might want to change. I don't want to end up in a situation where I'm knocking on people's

00:30:41.520 --> 00:30:46.160
 doors and they say I complain and they just tell me it's the other department. So let's

00:30:46.160 --> 00:30:51.320
 look forward. So with that, item C, receive a report, hold a discussion, provide direction

00:30:51.320 --> 00:30:58.080
 on the status of Texas Department of Transportation and city of Denton capital projects.

00:30:58.080 --> 00:31:08.860
 >> Thank you, Chair. And as Chair Meltzer mentioned that we had a brief discussion. What was -- what

00:31:08.860 --> 00:31:14.400
 conversation did he have with Mark Nelson who was the previous staff liaison about this

00:31:14.400 --> 00:31:22.360
 particular item. And what I got from the discussion I had was how do we overlay -- it's more of

00:31:22.360 --> 00:31:30.520
 a how do we present a big picture on the schedule of when these big capital projects that the

00:31:30.520 --> 00:31:36.400
 city has will be under construction along with all the big projects that text odd is

00:31:36.400 --> 00:31:43.640
 working on and kind of start laying out the timeline overlap, understand the traffic impacts

00:31:43.640 --> 00:31:48.960
 where would traffic be impacted and give a big picture. So I'm going to start with a

00:31:48.960 --> 00:31:54.320
 brief description of three of our projects that's a start, but we're going to expand

00:31:54.320 --> 00:31:59.560
 at some point and towards the end of the presentation, their next steps. But I'll talk about three

00:31:59.560 --> 00:32:04.200
 of our projects and then how they integrate or overlay with three of the big text odd

00:32:04.200 --> 00:32:09.960
 projects that are either under construction or will be soon in the next six months.

00:32:09.960 --> 00:32:14.960
 This project, this particular one is Hickory Creek Road. We've already completed design.

00:32:14.960 --> 00:32:22.440
 It's out to bid. And by February 2019, we'll go out to construction on this project. We

00:32:22.440 --> 00:32:28.320
 don't know currently how far our dollars will stretch. So depending on the alternate bids

00:32:28.320 --> 00:32:34.120
 that we have, we might end up -- the first segment would be green and then or some portion

00:32:34.120 --> 00:32:40.120
 all the way to River Pass. So there are different components. It may end at Montecito depending

00:32:40.120 --> 00:32:46.720
 on the bids that we get. But definitely this portion, the first segment on the east side

00:32:46.720 --> 00:32:54.160
 where it connects to 2181 will be under construction starting February 2019 and it's almost a two

00:32:54.160 --> 00:33:00.520
 and a half year project and it will be under construction. So that's the first one. Next

00:33:00.520 --> 00:33:07.560
 one, big one is vintage Boulevard. It's called Bonnie Bray Phase 2. The way the funding is

00:33:07.560 --> 00:33:12.200
 set up through RTR, it was connecting to Bonnie Bray and that's why it's called Bonnie Bray

00:33:12.200 --> 00:33:22.040
 Phase 2. But vintage between I-35W and 377 is another one that will be starting construction

00:33:22.040 --> 00:33:31.160
 in the fall of next year right around the end of or beginning in midsummer kind of deal.

00:33:31.160 --> 00:33:37.040
 And then the construction is another two years on this particular project too. And then these

00:33:37.040 --> 00:33:43.680
 are the small transportation projects. This is the third one, Dallas Drive at Teasley.

00:33:43.680 --> 00:33:48.640
 We have started construction, some part of it. Initial message boards are already out

00:33:48.640 --> 00:33:54.840
 there. And then it's a smaller project, three month construction period. The next one that's

00:33:54.840 --> 00:34:00.800
 right at the tail end of it and that does affect other projects that are going on on

00:34:00.800 --> 00:34:06.640
 tech stock is Colorado and the Loop. We're currently working with the bank to make sure

00:34:06.640 --> 00:34:12.680
 their accesses are restored by the time we're done with this project and they get enough

00:34:12.680 --> 00:34:20.480
 access. So that's scheduled to begin in February and in April. It's a two month project. These

00:34:20.480 --> 00:34:24.960
 particular projects are capacity enhancement, adding turn lanes at each of these intersections,

00:34:24.960 --> 00:34:32.920
 making it better, improving traffic flow. So the overlay, this is the first project,

00:34:32.920 --> 00:34:36.360
 Hickory Creek. >> Can you go back to the --

00:34:36.360 --> 00:34:41.240
 >> Absolutely. >> So the Dallas Drive Teasley Lane, I'm pretty

00:34:41.240 --> 00:34:44.520
 excited about that. I think it's going to be great when it's done. But of course you

00:34:44.520 --> 00:34:48.380
 hear comments and you listen. I don't know if you're aware of those. If you could just

00:34:48.380 --> 00:34:54.280
 address, because some people say right now that they wish that the I-35 project could

00:34:54.280 --> 00:35:00.360
 be done first and then I've also heard this is the only way out of town right now or that

00:35:00.360 --> 00:35:05.200
 the timing just doesn't seem right. Can you address that? Because from what I understand,

00:35:05.200 --> 00:35:09.760
 there's another timing aspect where this needs to be complete before something else opens

00:35:09.760 --> 00:35:13.360
 to help the traffic flow. So if you could just --

00:35:13.360 --> 00:35:19.600
 >> Correct. So there are a couple things. Interchanges, if you look at the big picture

00:35:19.600 --> 00:35:25.840
 here, there are -- I can open up a -- just for discussion purposes, I can open up a map

00:35:25.840 --> 00:35:41.360
 because that's always a better way. So if you look at the overall big picture, currently

00:35:41.360 --> 00:35:47.520
 there is construction on Brinker interchange way down here. The Loop 288 interchange is

00:35:47.520 --> 00:35:55.960
 under construction. This ramp, particular on ramp is closed. That's why all this traffic

00:35:55.960 --> 00:36:04.440
 is now almost diverted to this one interchange. People have learned over the last few months

00:36:04.440 --> 00:36:10.840
 that 377 is an alternative. So a lot of them go down 377 and get onto the freeway as much

00:36:10.840 --> 00:36:18.540
 as they can. So these two currently are working as the main interchanges for the city, especially

00:36:18.540 --> 00:36:25.680
 on the south side. It's very congested. The next thing that is -- so this particular textile

00:36:25.680 --> 00:36:31.440
 project is going to go on almost -- current schedule, they're saying is July 2019, which

00:36:31.440 --> 00:36:36.760
 we don't think is realistic. It's most likely going to be towards the end of next year,

00:36:36.760 --> 00:36:43.760
 which puts us in a whole construction mode for another year for this particular area.

00:36:43.760 --> 00:36:51.560
 The other thing that is also happening is U.S. 377 south of 35 will be soon under construction.

00:36:51.560 --> 00:36:57.800
 They have led the contract. There is a pre-construction meeting this month. They're going to start

00:36:57.800 --> 00:37:02.120
 with the utilities portion of it, which means they're not going to touch the lanes. They're

00:37:02.120 --> 00:37:07.600
 going to work on the side, similar to what they did on FM 2181. They're working on the

00:37:07.600 --> 00:37:13.500
 side on the ditches. They're not really touching the main lanes of travel. So this is not really

00:37:13.500 --> 00:37:19.000
 going to impact the traffic initially when they're working on the utilities. But in the

00:37:19.000 --> 00:37:23.560
 next three to four months, once they're done with the utilities, they will start working

00:37:23.560 --> 00:37:30.040
 on some of the lanes. And once that happens, then we've lost the window to do anything

00:37:30.040 --> 00:37:35.080
 at this intersection because that was our window where this is not going to happen for

00:37:35.080 --> 00:37:40.160
 end another year. This is starting soon in the next few months. So this is our right

00:37:40.160 --> 00:37:46.440
 window where we just get in and get this thing done or go through the pain. I mean, I understand.

00:37:46.440 --> 00:37:52.720
 I'm in the same boat getting in and out. I use this intersection every day. So it's a

00:37:52.720 --> 00:37:58.040
 matter of we have to go through the growing pains, and it's going to be better. But we

00:37:58.040 --> 00:38:05.120
 have this really slim window. This project is two years far. And so that's why we are

00:38:05.120 --> 00:38:10.280
 trying to push. And we understand that there will be some congestion to that end. What

00:38:10.280 --> 00:38:18.200
 we're doing is if you look at the construction plans, there is a lot of curb work here, which

00:38:18.200 --> 00:38:24.200
 won't really impact any of the through lanes. So we're making sure that all the curb work

00:38:24.200 --> 00:38:31.160
 is outside and not really impacting the capacity or the ability for motorists to make the turns.

00:38:31.160 --> 00:38:36.440
 So that's one area that we'll be focusing on initially, phase one. Phase two is working

00:38:36.440 --> 00:38:42.640
 inside. And we are trying to make sure that that happens off peak hours when there is

00:38:42.640 --> 00:38:48.680
 not that much traffic or if required, some night closures. So that's the direction we're

00:38:48.680 --> 00:38:54.760
 taking to make sure we alleviate construction pains while they're going.

00:38:54.760 --> 00:38:59.880
 I'm sorry to be a little dense, but it would help me if you spelled it out. Why is it important

00:38:59.880 --> 00:39:06.440
 that this not be done at the same time as 377 or the 35, that segment of 35?

00:39:06.440 --> 00:39:12.640
 So what is happening today is this interchange is experiencing all the traffic.

00:39:12.640 --> 00:39:14.800
 Yeah, I get why that needs to be done. It's horrible.

00:39:14.800 --> 00:39:20.360
 So this backs up all the way to this intersection. And at this particular intersection, there's

00:39:20.360 --> 00:39:27.280
 traffic from all directions trying to go to the freeway. And one of the issues is as a

00:39:27.280 --> 00:39:33.920
 relief for this interchange, this functions a relief wealth. So people when they really

00:39:33.920 --> 00:39:39.200
 are making a decision right at Bell and Eagle, some of them do use that route to get under

00:39:39.200 --> 00:39:46.240
 the freeway and some of them continue using that. So if this is also under construction,

00:39:46.240 --> 00:39:50.520
 that relief wealth is gone at that point. And we're only focusing on one interchange.

00:39:50.520 --> 00:39:56.080
 That made it much easier for me. Now I understand. But people bring it up. I can say for now,

00:39:56.080 --> 00:40:01.880
 consider going out 377. That's great.

00:40:01.880 --> 00:40:09.120
 Any other questions? I can go back. I think that covers a lot of the points in the presentation.

00:40:09.120 --> 00:40:18.920
 So let's go back to Hickory Creek and FM2181. They are going to overlap. FM2181 is currently

00:40:18.920 --> 00:40:24.560
 under construction. And they're barely wrapping up the utility. So it will be under construction,

00:40:24.560 --> 00:40:29.860
 lane widening in this particular area by Hickory Creek. At the same time, we're starting construction

00:40:29.860 --> 00:40:38.640
 early next year on Hickory Creek. So this is an access or a major connection for all these

00:40:38.640 --> 00:40:46.480
 residential areas and neighborhoods. So there will be traffic impacts associated with it.

00:40:46.480 --> 00:40:54.420
 We are trying to make sure our traffic control plans and plans for shifting lane traffic

00:40:54.420 --> 00:40:59.000
 and making sure that our Hickory Creek is accessible throughout the construction. So

00:40:59.000 --> 00:41:04.160
 making sure that traffic flows through this particular area during construction. But at

00:41:04.160 --> 00:41:11.160
 the same time, when these two projects are going in, there will be some traffic bleeding

00:41:11.160 --> 00:41:18.320
 into the neighborhoods and using the streets. Is there a sort of best alternate route that

00:41:18.320 --> 00:41:23.720
 we would recommend to people living north and south of the Blue Line?

00:41:23.720 --> 00:41:28.280
 Todd has an answer. So part of what we develop with every one

00:41:28.280 --> 00:41:36.680
 of these projects is a detour route. Now, no detour map is foolproof until traffic actually

00:41:36.680 --> 00:41:41.300
 hits it and people will try to find alternative routes. One of the things we would encourage

00:41:41.300 --> 00:41:47.720
 anybody to do, because I can't control a person's mind and where they want to go, what we can

00:41:47.720 --> 00:41:52.640
 do is try to encourage that behavior as best as we can. And then we are actively engaged

00:41:52.640 --> 00:41:57.920
 in the construction phase. Please contact the project manager, contact Pre-Tamari, and

00:41:57.920 --> 00:42:02.680
 we'll get the right people out there. We'll go look at it. Usually these construction

00:42:02.680 --> 00:42:07.960
 detour maps and phasing, they become very fluid because things you just don't think

00:42:07.960 --> 00:42:14.080
 of, they occur during construction as people start to divert around it. We try very hard

00:42:14.080 --> 00:42:19.400
 to plan for that up front. We give maps and signs and try to route that traffic around

00:42:19.400 --> 00:42:24.920
 to the most logical place, but people do find alternatives on their own. As soon as we hear

00:42:24.920 --> 00:42:28.960
 about them, we get engaged with the police department if it's necessary, or we get out

00:42:28.960 --> 00:42:33.200
 there and we start making shifts to signs, add signage, do some other things that we

00:42:33.200 --> 00:42:38.240
 need to to make sure that we can lessen the impact on those neighborhoods. But it is something

00:42:38.240 --> 00:42:42.080
 that we are actively engaged on construction projects. We just don't let them go and go

00:42:42.080 --> 00:42:43.080
 tough.

00:42:43.080 --> 00:42:50.280
 >> Yeah. And I get that. And, you know, I've experienced many of your clever detours. But,

00:42:50.280 --> 00:42:55.700
 you know, just as in the previous example where, you know, it wasn't obvious to me,

00:42:55.700 --> 00:43:00.880
 but that, like, maybe through social media it was just the suggestion we put out, like,

00:43:00.880 --> 00:43:08.000
 hey, think of going 377, you know, instead of Teasley right now, like a kind of plan

00:43:08.000 --> 00:43:13.760
 ahead kind of thought. You know, I wonder if there can be part of public engagement where

00:43:13.760 --> 00:43:20.360
 we just communicate. In other words, you're sort of at the last opportunity to make a

00:43:20.360 --> 00:43:22.840
 different choice when you get to the detour, right?

00:43:22.840 --> 00:43:29.080
 >> So part of what we're dealing with is could we have done these things earlier? Yes. If

00:43:29.080 --> 00:43:34.560
 we had been engaged in a lot of this earlier, your conversations with the public would have

00:43:34.560 --> 00:43:38.560
 been a lot more often, a lot more frequent, and we would have gotten some of these comments

00:43:38.560 --> 00:43:43.200
 that way. A lot of these projects are going to construction and hadn't had that put into

00:43:43.200 --> 00:43:47.240
 it. So projects going forward, we'll have a conversation all the way throughout the

00:43:47.240 --> 00:43:51.920
 design process, much less right here, right before we go to construction. We do have on

00:43:51.920 --> 00:43:55.400
 all these projects public meetings that we will be going out to the public to address

00:43:55.400 --> 00:44:01.320
 what is our -- what do we have currently for our detour routes, our maps, looking at them,

00:44:01.320 --> 00:44:06.640
 get feedback from folks. We can accommodate where we can and we absolutely want to because

00:44:06.640 --> 00:44:10.520
 these folks do know where their routes are. I mean, I know my neighborhood and the way

00:44:10.520 --> 00:44:15.480
 I get to work, I know that very well and I know the side streets. Some of the folks that

00:44:15.480 --> 00:44:20.840
 drive through the area don't. So that's where the routes, these detour routes, these detour

00:44:20.840 --> 00:44:24.880
 maps and the signs that go with them, yes, we want that feedback. We haven't had the

00:44:24.880 --> 00:44:30.880
 lead up time on some of these projects in an effort to get them out the door that we

00:44:30.880 --> 00:44:35.920
 would have liked to have had. Going forward, we've learned we have to talk more frequently,

00:44:35.920 --> 00:44:41.000
 we have to communicate back and forth more frequently where those issues and pinch points

00:44:41.000 --> 00:44:46.760
 for you, but we also have to understand that it's not going to be free flowing like it

00:44:46.760 --> 00:44:50.800
 is today when going to construction. It is going to be difficult for a while, but we

00:44:50.800 --> 00:44:55.400
 will do everything we can to absolutely try to make some kind of accommodation where we

00:44:55.400 --> 00:45:00.280
 can. I think I'm saying a different and easier thing because you're talking about hearing

00:45:00.280 --> 00:45:05.200
 the input, which is very good and very important and all four. I'm just saying even when you're

00:45:05.200 --> 00:45:12.320
 right on the brink of it, just for messaging out helpful tips on plan ahead, alternate

00:45:12.320 --> 00:45:20.360
 routes, you could tell them that day, you know, just as a kind of -- that's what I'm

00:45:20.360 --> 00:45:26.000
 teeing up as a suggestion. And, yeah, like, could we -- you're looking at me like I'm

00:45:26.000 --> 00:45:32.800
 from another planet. Is that sort of reasonable? And I think that is something that I know

00:45:32.800 --> 00:45:40.920
 we're working with PIO on. I know we're working with our public information office with is

00:45:40.920 --> 00:45:46.160
 exactly that, where we can have something that does come up more on a -- hey, I know

00:45:46.160 --> 00:45:49.920
 we're going to have some construction impacts today that weren't there yesterday so we can

00:45:49.920 --> 00:45:54.520
 release that information as early as possible or even better two or three days ahead of

00:45:54.520 --> 00:45:59.760
 time so folks are aware of them. It's coming. It's just tougher to get to immediately.

00:45:59.760 --> 00:46:06.280
 But I'm just saying just to go one more step, not just this is happening, but here's some

00:46:06.280 --> 00:46:11.200
 suggestions. What suggestions are you talking about?

00:46:11.200 --> 00:46:17.980
 Like go through 377 instead of Teasley or whatever you suggest people here do. Consider

00:46:17.980 --> 00:46:23.160
 planning your trip -- trip planning. Consider planning going whatever way to the west.

00:46:23.160 --> 00:46:26.360
 We probably are saying the same thing. To me, when I'm talking about a detour route

00:46:26.360 --> 00:46:31.240
 and detour maps and doing them up front, it's exactly that. It's looking at it from a regional

00:46:31.240 --> 00:46:36.800
 basis and not just, hey, by the way, there's a road you got to turn left here. It's getting

00:46:36.800 --> 00:46:40.400
 broader. We haven't done that in the past really well. I mean, you look at that in some

00:46:40.400 --> 00:46:45.000
 of the areas where we have some signs out today for maintenance work, they show up all

00:46:45.000 --> 00:46:50.200
 of a sudden and then, you know, if we had known eight blocks ahead of time, we could

00:46:50.200 --> 00:46:54.560
 have pushed somebody this way instead of oh, my goodness, you're right on it now.

00:46:54.560 --> 00:46:58.360
 But I think what we can do, in addition to what Ty is doing, they're creating those detour

00:46:58.360 --> 00:47:02.920
 maps way ahead of time. It's working directly with PIO because a lot of it is based on -- could

00:47:02.920 --> 00:47:07.720
 be weather related. If the project was going to start on a Monday, but it's rained and

00:47:07.720 --> 00:47:12.000
 so they're not going to close the street until maybe Wednesday, then it's more about pushing

00:47:12.000 --> 00:47:16.600
 those detour maps out literally right on the brink of when the road is going to be closed.

00:47:16.600 --> 00:47:21.320
 So it's kind of front of mind to the user, whether it's on social media or the website

00:47:21.320 --> 00:47:26.160
 or whatever the case may be, a blast, an email. So I think we can do a little bit better in

00:47:26.160 --> 00:47:30.560
 getting the word out right up to the brink of the project or the road being closed so

00:47:30.560 --> 00:47:34.360
 that the traffic, the community public is alerted.

00:47:34.360 --> 00:47:38.920
 >> I think we'll sort of stand or fall on the public size based entirely on this.

00:47:38.920 --> 00:47:39.920
 >> Right.

00:47:39.920 --> 00:47:42.560
 >> During this period. There's so much going on.

00:47:42.560 --> 00:47:47.040
 >> And it is good conversation. We're coming back to council, the entire council, on the

00:47:47.040 --> 00:47:53.160
 7th, to fold in all these city projects that are folded in with the TechStop projects and

00:47:53.160 --> 00:48:00.580
 our overall communications plan is we're looking at doing a special citizens newsletter that's

00:48:00.580 --> 00:48:06.120
 outside of the norm that highlights all of these projects and gives a little bit of descriptor

00:48:06.120 --> 00:48:13.520
 with the map that will be mailed out to the community and again continue to reinforce

00:48:13.520 --> 00:48:18.320
 those communication efforts because things will change. Once that thing is printed, if

00:48:18.320 --> 00:48:22.520
 we have a lot of rain, it's already outdated. So we're going to have to continually update

00:48:22.520 --> 00:48:25.860
 that in a digital format.

00:48:25.860 --> 00:48:31.880
 >> Just a comment that I think the waste thing we were talking about earlier is kind of what

00:48:31.880 --> 00:48:39.320
 the solution would be for this type of last minute redirection. So just a comment there

00:48:39.320 --> 00:48:44.620
 that, you know, there are tools available that once we start using them will definitely

00:48:44.620 --> 00:48:45.620
 help.

00:48:45.620 --> 00:48:49.040
 >> And it may be just as easy as just encouraging people to download the Waze app just so you

00:48:49.040 --> 00:48:50.040
 have the latest and greatest.

00:48:50.040 --> 00:48:51.040
 >> Yeah.

00:48:51.040 --> 00:48:53.440
 >> Again, not to endorse something, but that is something that the COG I know is working

00:48:53.440 --> 00:48:59.600
 pretty closely with to get that information real time. So those detours and those notifications

00:48:59.600 --> 00:49:03.640
 online or excuse me, on your phone are done while you're driving and in a safe manner,

00:49:03.640 --> 00:49:06.360
 of course, but while you're in route.

00:49:06.360 --> 00:49:09.720
 >> Can you go back one slide?

00:49:09.720 --> 00:49:10.720
 >> Yep.

00:49:10.720 --> 00:49:17.640
 >> Because I travel this area very frequently. And have we looked at -- I know it's part

00:49:17.640 --> 00:49:25.600
 of the future construction project between 2181 and 2499, a stop light at Hickory Creek

00:49:25.600 --> 00:49:30.400
 and I know it's part of that project, but right now that would create a huge relief

00:49:30.400 --> 00:49:35.200
 because that traffic gets back to -- that's a turn I don't make intentionally. I will

00:49:35.200 --> 00:49:40.640
 find a way around that, that it would route people away from the 2181 and give them an

00:49:40.640 --> 00:49:43.600
 easy way to get back out to 35.

00:49:43.600 --> 00:49:50.240
 >> Correct. So that's a separate project, Hickory Creek East, and we are including a

00:49:50.240 --> 00:49:55.400
 traffic signal design. We're looking at that particular -- as part of the design. So once

00:49:55.400 --> 00:50:00.760
 this design is completed and it goes to construction, that signal will be implemented at 2499 and

00:50:00.760 --> 00:50:01.760
 Hickory Creek.

00:50:01.760 --> 00:50:06.480
 >> And have we looked at potentially trying to get that in place sooner rather than waiting

00:50:06.480 --> 00:50:13.960
 until that construction to allow 2499 to become the relief for 2181? Because right now there's

00:50:13.960 --> 00:50:18.000
 not -- you've got Robinson that goes across or you've got to go all the way down to the

00:50:18.000 --> 00:50:20.880
 bottom that's right now under construction.

00:50:20.880 --> 00:50:25.200
 >> So that is a possibility. They're working on the warrants analysis. Once we have that,

00:50:25.200 --> 00:50:30.720
 we'll send it to TechStat. And TechStat needs to approve that. But we can expedite to an

00:50:30.720 --> 00:50:34.160
 earlier stage the signal. So signal can be a starting point.

00:50:34.160 --> 00:50:44.160
 >> Last I heard there had been 15 accidents at that intersection already. So it's warranted.

00:50:44.160 --> 00:50:45.160
 >> Wow.

00:50:45.160 --> 00:50:51.320
 >> And since that road only opened in April, that's not a very long time period to have

00:50:51.320 --> 00:50:52.320
 that many accidents.

00:50:52.320 --> 00:50:56.400
 >> Yes, and that's why that lane collider is in place. We've worked with TechStat to

00:50:56.400 --> 00:51:00.760
 put that in place so that they get out safely.

00:51:00.760 --> 00:51:07.880
 >> How far away are we from, you know, from being able to consider executing a Waze partnership?

00:51:07.880 --> 00:51:17.280
 >> We're at least three to four months out. One of the biggest challenges is how are softwares

00:51:17.280 --> 00:51:23.440
 that are integrated. Towards the end of the presentation, I'll show you a map. We have

00:51:23.440 --> 00:51:30.300
 some type of database and software that projects on a map. It's GIS based. Translating that

00:51:30.300 --> 00:51:35.920
 into what Waze requires as far as their data and pulling that into their system. So IT

00:51:35.920 --> 00:51:41.880
 is looking at what kind of information we share, what is the risk associated with it,

00:51:41.880 --> 00:51:45.680
 and then what kind of information we get back and what is the risk associated with that.

00:51:45.680 --> 00:51:50.400
 So IT is looking at the risk and the legal component. So I'm thinking it's going to be

00:51:50.400 --> 00:51:55.500
 more than three to four months before we can actually say, yes, we're ready to launch this

00:51:55.500 --> 00:52:00.400
 app immediately. In the meantime, we're working on this map and we're thinking of launching

00:52:00.400 --> 00:52:07.440
 this on our website so that way it's more helpful to have some kind of picture or create

00:52:07.440 --> 00:52:13.520
 some newsletter. So we have our own steps, but the ultimate goal is Waze.

00:52:13.520 --> 00:52:19.360
 >> Is there anything that we can do to create more resources or, you know, anything that

00:52:19.360 --> 00:52:25.040
 would make that happen faster? I think it's a very exciting, you know, kind of silver

00:52:25.040 --> 00:52:30.480
 bullet. I really appreciate Councilmember Briggs pointing out, you know, maybe the obvious,

00:52:30.480 --> 00:52:36.160
 you know, that if that were a formal partnership and we're communicating to the public, that

00:52:36.160 --> 00:52:43.320
 we're going into a historic, never quite seen before period of road construction activity

00:52:43.320 --> 00:52:47.320
 and we want to get everyone through it, you know, and here's something simple you can

00:52:47.320 --> 00:52:52.040
 do and it answers all of these things, right? You don't have to have a separate communication

00:52:52.040 --> 00:52:58.680
 effort about each one. You know, that sounds like a really easy thing to communicate. So,

00:52:58.680 --> 00:53:07.160
 yeah, what can we do to help? >> Let us check. Let us check and we'll work

00:53:07.160 --> 00:53:11.600
 on that. Let staff work on that and we'll see what we can do to expedite that.

00:53:11.600 --> 00:53:17.240
 >> Okay, very exciting. So, yeah, carry on. >> Yeah, I think I have a couple more integrations.

00:53:17.240 --> 00:53:22.520
 This is Vintage and this is in the later part of next year that Vintage Boulevard will be

00:53:22.520 --> 00:53:29.320
 under construction, but US 377 is already under construction. The reason these are connected

00:53:29.320 --> 00:53:37.360
 is Vintage is the last connection between I-35W and 377 to get in town. Else you have

00:53:37.360 --> 00:53:44.900
 to go through the Y and then go back south. So Vintage is a connector and definitely the

00:53:44.900 --> 00:53:53.960
 traffic on Vintage as well as 377 is somehow connected where it provides a route for people

00:53:53.960 --> 00:53:59.360
 coming from the south using 35W. So, both of these will be under construction and there

00:53:59.360 --> 00:54:03.880
 will be certain impacts. We will definitely have detour routes and we'll make sure that,

00:54:03.880 --> 00:54:08.320
 I think there is a Crawford Road on the south and there are a couple earlier exits work

00:54:08.320 --> 00:54:15.360
 with TXDOT to make sure we have the right detour plans in place. The last one, I think

00:54:15.360 --> 00:54:20.360
 we already talked about this in pretty detail. This is the small transportation projects

00:54:20.360 --> 00:54:25.560
 and the I-35 interchange project. So, if you have any questions, I want to really get to

00:54:25.560 --> 00:54:33.760
 the next steps. All right, so what we're not looking at and there are certain other CIP

00:54:33.760 --> 00:54:39.320
 projects, if you focus on this particular area, there is a FM 1515 project which is

00:54:39.320 --> 00:54:44.760
 currently under design. We don't know the schedule as far as construction goes. It's

00:54:44.760 --> 00:54:51.160
 a TXDOT project, but we're working with TXDOT to make sure that the alignment, the facility,

00:54:51.160 --> 00:54:56.840
 everything aligns with what the city wants. Better connection in this area as far as connection

00:54:56.840 --> 00:55:02.600
 to all the businesses Peter built and obviously the airport at the end. And then along the

00:55:02.600 --> 00:55:09.880
 same line we have Bonnie Bray which is a multi-stage project. Currently it will start, the work

00:55:09.880 --> 00:55:14.800
 will start on the utility side. It's a north-south water main and then after that it will be

00:55:14.800 --> 00:55:24.760
 followed by the roadway project. So, this is coming soon. McKinney will be under construction

00:55:24.760 --> 00:55:31.160
 pretty soon, early next year and Mayhill is already under construction. So, I wanted to

00:55:31.160 --> 00:55:37.440
 bring this to light that there are other projects going on in the city. On top of all the street

00:55:37.440 --> 00:55:43.080
 maintenance projects, these are smaller street maintenance projects where it's either reconstruction,

00:55:43.080 --> 00:55:48.920
 rehab, mill and overlay. So, there is some construction going on where the traffic will

00:55:48.920 --> 00:55:55.560
 be detoured, traffic will have other routes that they need to follow. So, in the big picture

00:55:55.560 --> 00:56:02.260
 what we're trying to focus on, I'm sorry, you have a question. Yes, on the next six

00:56:02.260 --> 00:56:09.040
 months it says, so from Hinkle and University on up, that's all in my district. So, except

00:56:09.040 --> 00:56:16.160
 for just that one little area over off of Westway is District 2. My question is, have

00:56:16.160 --> 00:56:20.600
 all of these already had the utilities moved and wastewater and water and they're just

00:56:20.600 --> 00:56:29.640
 waiting, they're on a list for the streets? By and large, yes. Windsor is a little different

00:56:29.640 --> 00:56:34.240
 because we have put both the water, wastewater and streets bundle into a, we've bundled

00:56:34.240 --> 00:56:39.800
 them into one overall project. That will get bid out to a contractor who will then do all

00:56:39.800 --> 00:56:44.080
 three components, but they'll do it continuously as they move through the neighborhood. And

00:56:44.080 --> 00:56:48.880
 so when it says next six months, that just means a start within the next six months and

00:56:48.880 --> 00:56:56.480
 not completed. Correct. Correct. Alright, thank you. So then looking at the big picture,

00:56:56.480 --> 00:57:01.920
 if we start overlaying some of these projects, almost every entry point to the city is under

00:57:01.920 --> 00:57:08.080
 construction. Yeah, so that's kind of a big deal, right? That is a big deal. And our ultimate

00:57:08.080 --> 00:57:15.320
 goal is to have something like this with individual name tags, meaning this will be under construction

00:57:15.320 --> 00:57:21.840
 from this point to this point, understanding what overlaps each other, and then also creating

00:57:21.840 --> 00:57:28.640
 some sort of detours or understanding what are the options that residents should start

00:57:28.640 --> 00:57:34.520
 using in particular areas, focusing on single areas. Are any of these things, like when

00:57:34.520 --> 00:57:42.800
 you look at it with the overlay, does it suggest that we ought to sequence some of this a little

00:57:42.800 --> 00:57:53.120
 differently or are we just grinding the city to a halt? That's a careful balancing act

00:57:53.120 --> 00:57:56.400
 because what you're seeing here is what's going under construction in the next six months

00:57:56.400 --> 00:57:59.800
 and not what we're looking at going under construction in the next 24 months. Yes, that

00:57:59.800 --> 00:58:04.320
 is something we're evaluating, but it's a much bigger task than just what you see on

00:58:04.320 --> 00:58:08.640
 these maps. That's what I wanted to look at each quarter by quarter. So we're looking

00:58:08.640 --> 00:58:14.640
 at it, we meet weekly to have exactly that discussion. What goes out when, because there's

00:58:14.640 --> 00:58:20.720
 so many other factors that go into it than just purely construction itself. It's right

00:58:20.720 --> 00:58:28.000
 away acquisition, the utilities being in or out of the way. This is an interesting mix

00:58:28.000 --> 00:58:34.100
 of priorities to try to juggle constantly. So yes, we absolutely evaluate construction

00:58:34.100 --> 00:58:38.800
 schedules as the idealistic priority one when we want everything to go, but then there's

00:58:38.800 --> 00:58:43.880
 always something that comes in next. Oh, TxDOT is now slid their schedule back six months.

00:58:43.880 --> 00:58:51.000
 Okay, now we're pushing everything. So it's a constant menagerie of things. We're struggling

00:58:51.000 --> 00:58:57.440
 really hard to pull all this together, but it's something we'll be doing and we can bring

00:58:57.440 --> 00:59:09.520
 as a quarterly update. What does it look like now? That's problem identification. Okay,

00:59:09.520 --> 00:59:18.440
 we're sealing off the city. Good thing, bad thing. You decide. What do we do? That looks

00:59:18.440 --> 00:59:26.160
 hellish and basically where the lines cross. What do you do? Absolutely. We're working

00:59:26.160 --> 00:59:32.220
 through that. It's not easy. I mean, we have spent quite a bit of time and I do not want

00:59:32.220 --> 00:59:36.240
 to- It's an ambitious plan. It's an ambitious plan and I don't want to lose sight of just

00:59:36.240 --> 00:59:41.760
 where we started a year and a half ago where we had no plans. We had nothing. We weren't

00:59:41.760 --> 00:59:46.960
 going anywhere. We didn't even know how much this was going to cost. So we are there and

00:59:46.960 --> 00:59:50.600
 you're asking exactly the right questions, which are also the same questions we're asking

00:59:50.600 --> 00:59:56.160
 questions. How do you do this in a way that one, we're going to make people mad. Absolutely.

00:59:56.160 --> 01:00:01.440
 But two, how do we kind of mitigate that as much as possible? We are also seeing on here

01:00:01.440 --> 01:00:06.800
 what you don't see on here is what are we trying to get ahead of? TechStat is not going

01:00:06.800 --> 01:00:11.240
 to be done in a year and move out. They're going to be done with what you see on the

01:00:11.240 --> 01:00:14.960
 books right now in a year or two years and then they're going to move into the next phase

01:00:14.960 --> 01:00:22.000
 of I-35 construction, on the next phase of 380. So they're going to be here in our pocket,

01:00:22.000 --> 01:00:27.640
 in our back door for the next five to 10 years working on these things. What we're doing

01:00:27.640 --> 01:00:32.560
 now, yes, is painful, but we're trying to get ahead of the curve and not go through

01:00:32.560 --> 01:00:37.120
 what you've seen other communities much larger than us, like a Fort Worth or Dallas, constantly

01:00:37.120 --> 01:00:42.380
 go through right now where I got to catch up with these major expansions as TechStat's

01:00:42.380 --> 01:00:46.600
 doing the work. And then we don't have any relief routes. So the city then engages in

01:00:46.600 --> 01:00:51.920
 after they're already in construction on these major interstates in that construction even

01:00:51.920 --> 01:00:56.560
 worse than what we're dealing with right now. So it's not going to be fun. You're asking

01:00:56.560 --> 01:01:00.860
 exactly the right question and I appreciate you making us ensuring and holding us accountable

01:01:00.860 --> 01:01:06.000
 to toe the line, to really reach out to the public, make sure they understand it's not

01:01:06.000 --> 01:01:10.760
 fun for us either to try to balance all these things, but it is a challenge and we welcome

01:01:10.760 --> 01:01:16.360
 the opportunity to make that happen as a team working with the community, not against each

01:01:16.360 --> 01:01:17.360
 other.

01:01:17.360 --> 01:01:22.520
 I can tell you what people usually say. You're talking to someone who really agitated to

01:01:22.520 --> 01:01:32.080
 get a lot of stuff going. So I get the irony. But I know what people say is how about finish

01:01:32.080 --> 01:01:38.760
 one thing and then do the next, right? That's what they say to me. But part of what I'm

01:01:38.760 --> 01:01:41.800
 hearing you say is yeah, but there's eight things behind this.

01:01:41.800 --> 01:01:42.800
 Exactly.

01:01:42.800 --> 01:01:47.360
 We are catching up a lot of things that have been in the backlog. So it's more of we have

01:01:47.360 --> 01:01:52.520
 a crunch timeline. We have a specific timeline for delivering all our bond projects. So it's

01:01:52.520 --> 01:01:58.840
 more of we are trying to sequence it more appropriately in different parts of the city

01:01:58.840 --> 01:02:05.840
 and in concert with whatever's happening with take stop facilities. So yes, a lot of stuff.

01:02:05.840 --> 01:02:11.520
 And as Todd alluded to, there was a lot more projects coming in. There was a Mayhill interchange

01:02:11.520 --> 01:02:19.000
 and the bridge project coming in pretty soon. And it will be under design. So a lot more

01:02:19.000 --> 01:02:24.560
 take stop projects will continue in this area. And we're trying to make sure that we have

01:02:24.560 --> 01:02:30.200
 other routes that would relieve or provide a relief already constructed in place, example

01:02:30.200 --> 01:02:34.520
 Bonnie Bray when the 35 goes in.

01:02:34.520 --> 01:02:41.140
 So I just want to say that I really like seeing all the blue because I do hear, you know,

01:02:41.140 --> 01:02:46.640
 I know that it's going to be frustrating, but I hear a lot of my car is broken thanks

01:02:46.640 --> 01:02:51.320
 to your streets. There's too many potholes. My street has been, you know, looks like a

01:02:51.320 --> 01:02:55.640
 third world country for, you know, years. Why aren't you doing this? And I mean, I see

01:02:55.640 --> 01:02:59.400
 on there, you know, I know that the Kings Row section is going to be there. I mean,

01:02:59.400 --> 01:03:05.880
 I see things that are actually getting done. And for me, I mean, I appreciate that. Four

01:03:05.880 --> 01:03:10.160
 years on council hearing the same thing over and over again, you know, finally being able

01:03:10.160 --> 01:03:14.600
 to say, you know, look, here is our plan. And this is what we're going to do. And it's

01:03:14.600 --> 01:03:20.800
 going to be painful for a little while. But, you know, so I just wanted to say thank you

01:03:20.800 --> 01:03:28.120
 for doing this. I know we're going to have some issues with traffic, but I do think that,

01:03:28.120 --> 01:03:34.720
 you know, taking care of a lot of the streets within the city is a really big deal.

01:03:34.720 --> 01:03:39.080
 And I think the other thing too, and appreciate the statements and comments and everything

01:03:39.080 --> 01:03:47.080
 is taken to heart. What you're seeing here is a different team of folks in a different

01:03:47.080 --> 01:03:50.720
 approach. And so working that in working in a collaborative fashion with not only the

01:03:50.720 --> 01:03:54.880
 engineering, the folks on the boots on the ground, the operations, the community, the

01:03:54.880 --> 01:04:01.280
 folks that communicate, working with the public and the businesses. I mean, it's a full effort.

01:04:01.280 --> 01:04:07.760
 And again, it's we're making so many more strides today than we did just 18 months ago.

01:04:07.760 --> 01:04:13.560
 And so some of that is, I mean, I commute through these streets as well and those alternate

01:04:13.560 --> 01:04:18.880
 routes, you know, luckily I've got a, you know, kind of the hotline to this guy. Like,

01:04:18.880 --> 01:04:25.360
 why is the street closed at 8 o'clock or this lane of traffic? And so he hears it from me

01:04:25.360 --> 01:04:31.880
 on a very frequent basis, but it is we're so much further along. And because we were

01:04:31.880 --> 01:04:36.840
 behind and have been behind, it is about playing catch up. And so, you know, when we came to

01:04:36.840 --> 01:04:41.600
 council back during the budget process to need the additional monies to make, to finish

01:04:41.600 --> 01:04:47.080
 out the bond program and it's, you know, city manager said, we're going to make everybody

01:04:47.080 --> 01:04:55.160
 mad. And that's unfortunate, but that's the only way we're going to be able to get those

01:04:55.160 --> 01:05:02.760
 projects completed as timely as we can because time is money. The longer we wait, it's going

01:05:02.760 --> 01:05:06.720
 to cost us more. And we don't want to come back to the well, to the council. So we've

01:05:06.720 --> 01:05:09.960
 got to get these projects out. I know they're being very aggressive, getting these things

01:05:09.960 --> 01:05:15.840
 bundled out. So all the suggestions are great. And again, those detour maps, the getting

01:05:15.840 --> 01:05:20.600
 with PCO and make sure that those things are communicated as frequently as we can get those

01:05:20.600 --> 01:05:24.120
 out. And because these guys need to be working on project management and we need to let the

01:05:24.120 --> 01:05:27.720
 experts communicate and work hand in glove with those efforts.

01:05:27.720 --> 01:05:32.920
 >> I was going to suggest, what would you think about just, you know, providing with

01:05:32.920 --> 01:05:38.320
 a little bit of presentation this map to the public engagement committee? Here's what's

01:05:38.320 --> 01:05:49.360
 coming. I can tell you why. Help. >> Like I said, we'll be bringing this along

01:05:49.360 --> 01:05:53.840
 with what Jessica and her team is working on for communications to this next -- obviously

01:05:53.840 --> 01:06:00.320
 not today, but the following is the 27th of November. And then if we need to bring it

01:06:00.320 --> 01:06:04.000
 to the committee on citizen engagement, that's absolutely possible. We certainly can do that

01:06:04.000 --> 01:06:08.520
 with the same presentation. >> Yeah, I'm sure they feel happy to be included.

01:06:08.520 --> 01:06:10.680
 >> Absolutely. >> By the way, who's the room manager here?

01:06:10.680 --> 01:06:14.400
 Just want to know, when do we need to clear so they can change up the --

01:06:14.400 --> 01:06:17.880
 >> I think it's probably before 1130, right? Or 1115?

01:06:17.880 --> 01:06:21.320
 >> Yeah, okay. I mean, I don't think we have a lot more to cover.

01:06:21.320 --> 01:06:22.560
 >> No, I don't. >> Okay.

01:06:22.560 --> 01:06:28.280
 >> Yeah, well, just kind of a question or comment on this, because the title says projects

01:06:28.280 --> 01:06:33.320
 under construction and several of those aren't under construction yet or they'll be starting

01:06:33.320 --> 01:06:40.520
 in the next six months, I guess. One project I don't see on there is Forest Ridge, which

01:06:40.520 --> 01:06:49.720
 was supposed to be spring of 2019. >> Okay. I can check on that one. I'll make

01:06:49.720 --> 01:06:54.480
 sure it gets on the map. >> Okay.

01:06:54.480 --> 01:07:00.320
 >> Yeah, I think what we're trying to do, this is a GIS-based map, which feeds actively

01:07:00.320 --> 01:07:05.200
 every single project that goes to construction through our software system that tracks these

01:07:05.200 --> 01:07:09.240
 projects. So we're trying to get better in presenting the information that we already

01:07:09.240 --> 01:07:15.640
 had and staff knew at the staff level, but it was hard to present it on a map. So we've

01:07:15.640 --> 01:07:20.880
 gotten this far and there might be some glitches and some of the projects may be dropped. But

01:07:20.880 --> 01:07:26.580
 this is something that will form a platform that we push forward to Waze. And once Waze

01:07:26.580 --> 01:07:31.320
 understands each of these projects and what is the timeline associated, construction started

01:07:31.320 --> 01:07:36.560
 here, phase 1 completed here, phase 2, all the different elements, then that's the information

01:07:36.560 --> 01:07:42.120
 that they can communicate with all the motorists and drivers in the area. So I apologize. I

01:07:42.120 --> 01:07:48.200
 mean, we're still working through the kinks. >> All right. Can we agree to have as our

01:07:48.200 --> 01:07:55.120
 goal rather than to make everyone mad, to take this unusual circumstance to impress

01:07:55.120 --> 01:08:03.200
 the citizens with how well we manage this historic level effort? That's a goal. They

01:08:03.200 --> 01:08:07.880
 know it's a huge thing we're undertaking, but let's make sure they do and let's impress

01:08:07.880 --> 01:08:12.800
 them with how well we communicate. >> One last question, a follow-up question.

01:08:12.800 --> 01:08:21.440
 Will this map or one like it be on the streets webpage? Because I know that there is a map

01:08:21.440 --> 01:08:26.120
 on there, but you have to kind of know where you want and you click. And they're not all

01:08:26.120 --> 01:08:32.360
 on there at once. There's just a few. And so I'm just curious, because the way that

01:08:32.360 --> 01:08:36.160
 it is now, if you type in something and it shows you the start date and the end date,

01:08:36.160 --> 01:08:41.640
 it's very helpful. But if you have future ones on there, too, so that people know that,

01:08:41.640 --> 01:08:46.240
 you know, oh, my street is going to be, you know, in a few months. And then it just kind

01:08:46.240 --> 01:08:51.400
 of calms them down and they're more prepared for it than a door hanger the night before.

01:08:51.400 --> 01:08:57.560
 >> I think what might be helpful in that vein, because I know some folks are -- the GIS doesn't

01:08:57.560 --> 01:09:00.740
 scare them and they'll go click on the different layers and they can play with it. Some folks

01:09:00.740 --> 01:09:05.960
 it does and it's like, what is all this? So I think the intent, part of what Preetam was

01:09:05.960 --> 01:09:10.080
 alluding to is we wanted to have more of a PDF version that you could double click and

01:09:10.080 --> 01:09:14.540
 just see it. That gets updated periodically. And then some folks would go to GIS and see

01:09:14.540 --> 01:09:19.080
 all that information. Some folks just -- I want the whole map because I don't want to

01:09:19.080 --> 01:09:25.120
 go through all that. So yes, we'll do that. >> All right. So I look forward to seeing

01:09:25.120 --> 01:09:30.740
 you all on the cover of Infrastructure Communication Magazine. Let's carry on. We've got a little

01:09:30.740 --> 01:09:33.720
 bit more to go. Is there more on this? >> That's it.

01:09:33.720 --> 01:09:39.480
 >> All right. You don't want any more questions. So item D, receiver report, hold the discussion

01:09:39.480 --> 01:09:44.680
 and provide direction regarding Texas Department of Transportation on system projects in the

01:09:44.680 --> 01:09:51.120
 Denton area to include the 35 express project. >> So this is a lot of the projects are covered

01:09:51.120 --> 01:10:08.640
 under what we talked about. Let me see if I can -- there we go.

01:10:08.640 --> 01:10:16.640
 So as you can see, there's several projects that TxOTR is working within the city. Let

01:10:16.640 --> 01:10:27.240
 me just go one at a time. FM 2181. Currently, their schedule says February 20 construction

01:10:27.240 --> 01:10:34.480
 is -- wow, they updated that. It used to be -- well, no. FM 2181 will be constructed and

01:10:34.480 --> 01:10:45.520
 completed by 2020. They almost -- as far as utilities, there is at most conflict relocation

01:10:45.520 --> 01:10:52.840
 has been completed. So that was one of the items that was remaining. I don't see any

01:10:52.840 --> 01:11:01.400
 updates on this one. This construction is moving forward. And I think there is some

01:11:01.400 --> 01:11:05.400
 concerns from the contractor. >> There is one concern that may impact the

01:11:05.400 --> 01:11:11.840
 schedule of this project. Even more than it has. The general contractor that this contract

01:11:11.840 --> 01:11:19.080
 was awarded to, MCM construction, it appears that they are in danger of not being able

01:11:19.080 --> 01:11:27.040
 to complete this project. They may be insolvent before too long. So conversations have already

01:11:27.040 --> 01:11:32.040
 been initiated between TxOTR and their bonding company. So the bonding company is starting

01:11:32.040 --> 01:11:35.920
 to look into the pathway of them taking over the project. Now, the thing I would tell you

01:11:35.920 --> 01:11:42.480
 is anytime a bonding company gets into management of the project, it takes time. Because they

01:11:42.480 --> 01:11:46.240
 work through the legal issues, then who is doing what, holding certain folks' feet to

01:11:46.240 --> 01:11:51.400
 the fire, who do they find bringing to the table to do other things, and then it's just

01:11:51.400 --> 01:11:57.400
 a much more convoluted process. The potential here is that this could push out longer than

01:11:57.400 --> 01:12:03.820
 February of 2020 just because now we had an underperforming contractor. It is not getting

01:12:03.820 --> 01:12:08.920
 any better. The contractor themselves is having some financial issues. And it could present

01:12:08.920 --> 01:12:15.460
 itself in a much bigger delay than just what we're seeing right now.

01:12:15.460 --> 01:12:21.680
 And does this have to do with the issue that TxOTR has to choose the low-bid contractor?

01:12:21.680 --> 01:12:22.680
 Yes.

01:12:22.680 --> 01:12:28.060
 Okay. So yeah, I just want you guys to know that that is on the legislative agenda for

01:12:28.060 --> 01:12:32.320
 the Dallas Regional Committee. I think it is also...

01:12:32.320 --> 01:12:34.840
 It hasn't come to RTC yet.

01:12:34.840 --> 01:12:40.720
 Okay. So that is something that we are going to be looking and asking to change because

01:12:40.720 --> 01:12:47.520
 of the issues that it causes.

01:12:47.520 --> 01:12:56.000
 Okay. So this is US377. I started talking about this earlier. As mentioned, it's under

01:12:56.000 --> 01:13:00.680
 construction. We'll have a pre-construction meeting this month. And utilities will start

01:13:00.680 --> 01:13:07.440
 soon either end of this year or the next year. And then the construction will go all the

01:13:07.440 --> 01:13:19.920
 way through... It doesn't have a date here, but I mentioned it was 2021 in the presentation.

01:13:19.920 --> 01:13:25.760
 Moving on to the next... We did have a open house just to inform public in October for

01:13:25.760 --> 01:13:31.000
 this particular project. We did receive some comments. We're following up with responses.

01:13:31.000 --> 01:13:37.320
 And most of the comments were addressed by TxOT.

01:13:37.320 --> 01:13:41.460
 One of the comments that was not addressed by TxOT at that meeting is what their detour

01:13:41.460 --> 01:13:45.640
 routes are. So they can get that information out.

01:13:45.640 --> 01:13:51.240
 We have asked them and they've not provided the detour route. But typically what they

01:13:51.240 --> 01:13:58.640
 do is they do leave the lanes open for traffic. There is no full closures unless it's a few

01:13:58.640 --> 01:14:06.220
 hours to transfer. But they have flagging operations typically. They have one lane operations.

01:14:06.220 --> 01:14:10.600
 They don't fully... They will have to on that project at least

01:14:10.600 --> 01:14:14.360
 a couple of times shut down completely because of the railroad bridge.

01:14:14.360 --> 01:14:23.680
 And we've asked for the detour for the railroad bridge particularly. We'll get that to you.

01:14:23.680 --> 01:14:47.600
 I-35 Mayhill improvements. This is part of the... I'm not sure what...

01:14:47.600 --> 01:14:52.920
 This is the interchange improvement project. It's not even started. It will start under

01:14:52.920 --> 01:14:59.200
 design. So they're probably letting for design in December of 2019. They're going through

01:14:59.200 --> 01:15:06.480
 the process of getting the plans completed by fall of next year.

01:15:06.480 --> 01:15:13.280
 And then after that they'll go to construction. So it's currently under design. They've hired

01:15:13.280 --> 01:15:17.800
 LTRA to do the design. And this is a full interchange upgrade.

01:15:17.800 --> 01:15:24.920
 So this particular project will put this interchange in the final configuration. So they don't

01:15:24.920 --> 01:15:28.360
 have to go back and do it when they come back on phase two.

01:15:28.360 --> 01:15:33.920
 This is similar to what's currently happening at the Loop 288. It's going to the final configuration.

01:15:33.920 --> 01:15:38.600
 The frontage roads will be in their final location. And then when they come back with

01:15:38.600 --> 01:15:44.720
 35 next phase widening project, they don't have to update these interchanges. So it's

01:15:44.720 --> 01:15:50.880
 currently under design. Loop 288 Brinker Mayhill, I mentioned about

01:15:50.880 --> 01:15:59.000
 this project. This is... They're still claiming July 2019. But it's not going to likely happen.

01:15:59.000 --> 01:16:05.080
 We're thinking more towards the end of next year. We'll keep you posted as TxDOT releases

01:16:05.080 --> 01:16:10.000
 more information. But at this point they're still saying July 2019.

01:16:10.000 --> 01:16:15.800
 Can you remind me when the original completion date was supposed to be?

01:16:15.800 --> 01:16:21.240
 It was November 2018. Or even before that, it was June or July of 2018.

01:16:21.240 --> 01:16:22.240
 This past summer? Correct.

01:16:22.240 --> 01:16:25.820
 And now you're saying the end of next year?

01:16:25.820 --> 01:16:29.840
 Towards the end of next year is the most likely.

01:16:29.840 --> 01:16:39.440
 Yeah, the bucky's already open. It was supposed to coincide with bucky's.

01:16:39.440 --> 01:16:44.460
 This is I-35 North. This is north of 380. They're currently going through the environmental

01:16:44.460 --> 01:16:52.120
 phase. They're considering getting the environmental clearance by March of 2019. And they don't

01:16:52.120 --> 01:16:56.320
 intend to start any construction until September 2022.

01:16:56.320 --> 01:17:00.400
 So that's the plan. This is just the north of the city all the way to the boundary of

01:17:00.400 --> 01:17:09.240
 the county. I-35W Main Lanes, they're barely starting

01:17:09.240 --> 01:17:16.120
 -- there are no deadlines at this point. As you can see, this has just been dreamed

01:17:16.120 --> 01:17:20.020
 up as a project. And they're barely starting on this.

01:17:20.020 --> 01:17:26.380
 They have HNTP online. And they have completed 30% schematics.

01:17:26.380 --> 01:17:32.480
 So the next phase is getting into design phase and then into construction after that.

01:17:32.480 --> 01:17:40.340
 The limits of this project is all the way to -- I would say it's killer, almost killer.

01:17:40.340 --> 01:17:52.120
 And then starting at Denton. US-380 East. This project is currently -- I'm sorry.

01:17:52.120 --> 01:17:55.160
 It received the environmental clearances last year.

01:17:55.160 --> 01:18:02.500
 It's under the right of way acquisition phase. I think that was completed in 2019.

01:18:02.500 --> 01:18:06.880
 They don't intend to start construction until 2021.

01:18:06.880 --> 01:18:12.720
 It is currently -- this particular segment is currently getting -- it's under design.

01:18:12.720 --> 01:18:15.520
 And they're working with the city. They've contacted us.

01:18:15.520 --> 01:18:20.600
 And we're dealing with some of these connections at this particular end, talking about how

01:18:20.600 --> 01:18:28.840
 the city envisions this particular street. Loop 28 West.

01:18:28.840 --> 01:18:34.800
 This is -- this is a long-term project. It doesn't really go into construction all

01:18:34.800 --> 01:18:40.600
 the way in another 20 years. But the schematic will be approved early next

01:18:40.600 --> 01:18:41.960
 year. 30% schematic.

01:18:41.960 --> 01:18:48.880
 We're working with TxDOT, identifying the interchanges that we anticipate with all our

01:18:48.880 --> 01:18:54.240
 arterials going through in this particular area. I know this map is turned a little bit.

01:18:54.240 --> 01:18:59.280
 But if you can imagine, this is 35 on the north side and 35W on the south side.

01:18:59.280 --> 01:19:06.080
 We are anticipating different streets to cross, especially Jim Crystal and some of the others.

01:19:06.080 --> 01:19:11.640
 So we're making sure all our interchanges get into the schematics, that way when TxDOT

01:19:11.640 --> 01:19:16.240
 goes for design, they're all reincorporated. Yes.

01:19:16.240 --> 01:19:21.000
 Have we looked at trying to push the date up on this at all?

01:19:21.000 --> 01:19:25.640
 I mean, because this is just service roads only. And the let date right now is scheduled

01:19:25.640 --> 01:19:29.120
 for 2026. Correct.

01:19:29.120 --> 01:19:34.960
 Which means it's probably going to be closer to 2030.

01:19:34.960 --> 01:19:42.640
 This is very important for when they actually do the interchange of 35W, 35E, when they

01:19:42.640 --> 01:19:50.600
 do that, as well as routing traffic around that area when 35 north starts.

01:19:50.600 --> 01:19:55.600
 So I can't start and Todd can end, but we're working with John Polsker.

01:19:55.600 --> 01:20:02.680
 And as he has informed us, we can start working on this particular piece earlier.

01:20:02.680 --> 01:20:09.040
 There are some funds that can be obligated. We're going to start with furnitures, definitely.

01:20:09.040 --> 01:20:15.000
 But working with him, he doesn't see why we cannot move forward earlier on this project.

01:20:15.000 --> 01:20:19.480
 But I think if Todd can end. I think so much of this comes down to a funding

01:20:19.480 --> 01:20:23.320
 structure for TxDOT and when they can put the funds to it.

01:20:23.320 --> 01:20:26.520
 They're always willing to accelerate something if we're willing to put some of the funds

01:20:26.520 --> 01:20:30.720
 to it or all of the funds. But it really does come into where does it lay

01:20:30.720 --> 01:20:37.080
 out for them as well. But we do meet with them on a bi-weekly basis.

01:20:37.080 --> 01:20:40.480
 TxDOT and a larger group with John Polsker, our representative.

01:20:40.480 --> 01:20:45.000
 And we push these items, you know, what are the time frames here, we're constantly throwing

01:20:45.000 --> 01:20:48.800
 those things at them. And them talking to us as well about what

01:20:48.800 --> 01:20:53.040
 are the items and concerns they have. So it's a much more collaborative group than

01:20:53.040 --> 01:20:59.760
 what I had seen in the past in other cities. TxDOT does have a schedule just like us and

01:20:59.760 --> 01:21:07.040
 they got some financial restraints as well. Well, thinking of our previous presentation

01:21:07.040 --> 01:21:13.280
 on COG funding for projects, this may be, I don't know if this would be something that

01:21:13.280 --> 01:21:18.960
 we could qualify for, for extra funding through them to help get the project along because

01:21:18.960 --> 01:21:24.800
 I do know that this would relieve some of the internal city traffic and put some of

01:21:24.800 --> 01:21:29.240
 the freight in the trucks to keep them moving around rather than causing those backups.

01:21:29.240 --> 01:21:36.200
 So just something to maybe a project we could think about using those funds for.

01:21:36.200 --> 01:21:48.160
 FM1515, I mentioned earlier, it's under design currently and it's under 30 percent schematic,

01:21:48.160 --> 01:21:53.520
 which is a great phase for us to, you know, move it, make recommendations.

01:21:53.520 --> 01:21:58.960
 Once the 30 percent schematic is locked for TxDOT, it typically becomes a real big issue

01:21:58.960 --> 01:22:02.600
 to get it through environmental again. So this is a good time, we're working with

01:22:02.600 --> 01:22:14.120
 them, we have some alternatives we're looking at realigning Airport Road 1515. So the schedule

01:22:14.120 --> 01:22:20.840
 on this one is environmental clearance by December of 2020.

01:22:20.840 --> 01:22:33.880
 FM1173, this is on the north side of the city where it meets or intersects 35E and majority

01:22:33.880 --> 01:22:43.240
 of this project is in crumb area but we have this eastern end that connects and ultimately

01:22:43.240 --> 01:22:51.640
 this particular end will be realigned to match up to 77, US 77 here. Currently what is happening

01:22:51.640 --> 01:22:57.520
 is people go south and then connect through and then get on to 77 but this will be realigned

01:22:57.520 --> 01:23:05.800
 as part of that project to connect to US 77. Schematic approval, it is, I mean, they're

01:23:05.800 --> 01:23:10.000
 working on it, they most likely will get things racked up. Currently the schedule says end

01:23:10.000 --> 01:23:22.840
 of this year or so. I mean, we'll see. And I think that's the last one. I think that's

01:23:22.840 --> 01:23:27.080
 the last one. Actually, I suppose formally I would have

01:23:27.080 --> 01:23:31.280
 to close this item and then reopen the other item. I had a question back on the policy

01:23:31.280 --> 01:23:36.080
 bundles. I don't know if we've ever covered, how much do we stand to get in credits if

01:23:36.080 --> 01:23:44.720
 we hit the, you know, minimum 10? So part of it is unclear but it is transportation

01:23:44.720 --> 01:23:51.040
 development credits that can be used towards our 20% local match. So how much per policy

01:23:51.040 --> 01:23:55.520
 - But is it like a dollar or? It is just credit. It's credit. It's not really

01:23:55.520 --> 01:24:02.640
 a dollar amount but the way it works is they can use, we can use those credits as cash

01:24:02.640 --> 01:24:09.840
 or our share of 20% match for any project. So that boosts our share in terms of if we

01:24:09.840 --> 01:24:14.600
 have a project that's 100 million instead of putting in 20 million, we can just come

01:24:14.600 --> 01:24:18.680
 up with 10 and then the other 10 it'll be matched. So that's the whole program.

01:24:18.680 --> 01:24:21.920
 But with no limit, with anything that has a match?

01:24:21.920 --> 01:24:27.360
 Yes, anything, any project. The way it's set up, any project that has a local match, the

01:24:27.360 --> 01:24:32.920
 transportation development, any transportation projects. Okay, I'd be curious to know like

01:24:32.920 --> 01:24:36.880
 how much that might mean at some future meeting. Yes, we'll get a value amount.

01:24:36.880 --> 01:24:45.600
 Or maybe in a note back to us. Okay, so we're done with item D. We're on to staff reports,

01:24:45.600 --> 01:24:53.360
 matrix. Anything for the matrix? This is the matrix and I think there are, we're still

01:24:53.360 --> 01:25:01.480
 working on this old gateway plan but I think Todd can talk about the two items here, the

01:25:01.480 --> 01:25:07.240
 ELM and LOCUS turned back. Go ahead and I'm going to cover three.

01:25:07.240 --> 01:25:13.600
 So on the ELM/LOCUS turn back, we did have a minor setback that we're working through.

01:25:13.600 --> 01:25:21.360
 So PEC 4 was the lead up to the ELM/LOCUS turn back, phases 1 and 2. That bid came in

01:25:21.360 --> 01:25:28.180
 higher than we anticipated. So we will have a piece of that that we're looking at multiple

01:25:28.180 --> 01:25:33.000
 alternatives to recover. We'll have to re-bid the project to get better pricing. We've identified

01:25:33.000 --> 01:25:39.480
 several places where we believe that impacted it. But we are looking at a schedule recovery

01:25:39.480 --> 01:25:45.240
 potential in that we may have internal crews just do the crossing at Locust so that TxDOT

01:25:45.240 --> 01:25:52.680
 is, their timeline to start doing the reconstruction of Locust itself isn't impacted. We continue

01:25:52.680 --> 01:25:58.920
 with the Locust reconstruction beginning next summer. Then the summer following that would

01:25:58.920 --> 01:26:07.000
 still be ELM. Questions?

01:26:07.000 --> 01:26:12.760
 And then on number three, city council back in October, on October the 16th approved the

01:26:12.760 --> 01:26:21.920
 change order to design the improvements along Hickory, the sidewalk improvements along with

01:26:21.920 --> 01:26:26.320
 the lighting and some drainage improvements. My request is that that could come off the

01:26:26.320 --> 01:26:34.120
 matrix since it's being worked on. Any objections? Seeing, yes, Pat?

01:26:34.120 --> 01:26:41.480
 I just have a question about the matrix. Because I recall several times I asked about and it

01:26:41.480 --> 01:26:46.840
 may have come up and then fallen back off and came up but with the last Tuesday meeting

01:26:46.840 --> 01:26:53.120
 there were some citizens that spoke on protected bike lanes and I had asked for a presentation

01:26:53.120 --> 01:26:59.280
 on protected bike lanes for a while and I'd like to request that again, especially now

01:26:59.280 --> 01:27:04.440
 that we're doing our mobility plan and complete streets and because there are several different

01:27:04.440 --> 01:27:12.060
 options that we can talk about when it comes to that and I would like to have that added

01:27:12.060 --> 01:27:15.360
 back to the matrix.

01:27:15.360 --> 01:27:20.000
 So quick clarification, do you want it as an agenda item so that the presentation we

01:27:20.000 --> 01:27:25.200
 can talk about and present it or do you want it as a matrix item?

01:27:25.200 --> 01:27:27.000
 A presentation.

01:27:27.000 --> 01:27:41.320
 Okay. We all concur. Anything else on the matrix? Going once, going twice. Okay. Concluding

01:27:41.320 --> 01:27:47.760
 items, speeches or anything? Public oratory of any kind.

01:27:47.760 --> 01:27:53.880
 On the road work, it says that Spencer is going to be done on 11/28 and I'm just going

01:27:53.880 --> 01:28:00.980
 to ask for clarification that that's still the finish date. If anybody knows or can get

01:28:00.980 --> 01:28:11.040
 back to me on that, Spencer Road, it says the complete date is 11/28 which is coming

01:28:11.040 --> 01:28:12.800
 up really soon.

01:28:12.800 --> 01:28:16.640
 That is still a goal to turn it back to two-way traffic. We'll still be doing some auxiliary

01:28:16.640 --> 01:28:21.520
 stuff off on the parkway to clean up and then make some connections at the end but yes it'll

01:28:21.520 --> 01:28:25.840
 be open to two-way traffic by the end of the month.

01:28:25.840 --> 01:28:32.880
 Okay. And there's still some issues being reported downtown with the walk signals and

01:28:32.880 --> 01:28:40.000
 I just I would still I would like to request that our group take a walk downtown and see

01:28:40.000 --> 01:28:46.080
 how those are implemented at some point.

01:28:46.080 --> 01:28:55.320
 Maybe when it's not 20 degrees. When it's a little warmer but not a whole lot warmer.

01:28:55.320 --> 01:29:07.640
 Minimum 40 degrees, should we say? I have a question. I've got one and I don't know

01:29:07.640 --> 01:29:12.880
 if it's necessary to put it on this or if I can meet with you all separately on it but

01:29:12.880 --> 01:29:18.240
 I know most of the signals along 35 are kind of interlocked between the two sides of the

01:29:18.240 --> 01:29:24.560
 road. Bonnie Bray does not appear to be that way and I'm just questioning whether it's

01:29:24.560 --> 01:29:29.360
 it is that way and just poorly set up or if we can just take a look at what Bonnie Bray

01:29:29.360 --> 01:29:34.200
 and 35 does how those stop lights interconnect.

01:29:34.200 --> 01:29:45.640
 I just have a kind of general question. What list is it that contains these sort of little

01:29:45.640 --> 01:29:53.320
 things that I and I'm sure others throw your way like the question about whether the lane

01:29:53.320 --> 01:30:04.000
 alignment is right going south of the square and then and they request to look at a bump

01:30:04.000 --> 01:30:12.160
 out on Hickory and Miller for visibility when making a left there. You know, too small for

01:30:12.160 --> 01:30:21.520
 the matrix. It's not a road construction list. Is there a list of little requests?

01:30:21.520 --> 01:30:29.240
 Yes. Which is a great segue. We have a few members of our expanded traffic engineering

01:30:29.240 --> 01:30:33.600
 section here and that is part of what they're charged with doing is keeping up with that

01:30:33.600 --> 01:30:41.900
 running list and giving Preetam was our only traffic section. As you can imagine him trying

01:30:41.900 --> 01:30:46.400
 to keep tabs on that and everything else we're doing was very difficult. It's still a challenging

01:30:46.400 --> 01:30:51.460
 job even when you have four people trying to work on that now. Just for the city our

01:30:51.460 --> 01:30:58.760
 size there's so many of those. This group that we have here today they do that for us.

01:30:58.760 --> 01:31:05.020
 It's ongoing and we're just getting into a rhythm. We've not had this group put together

01:31:05.020 --> 01:31:08.520
 but for about two or three weeks now. Want to make some quick introductions?

01:31:08.520 --> 01:31:19.960
 Sure. We absolutely could. When I call your name. The first one is Becky and she is transitioning.

01:31:19.960 --> 01:31:25.760
 She will be soon transitioning to taking over what Kim is doing right now to be the admin

01:31:25.760 --> 01:31:31.720
 person for the minutes and everything for this particular committee as well as she will

01:31:31.720 --> 01:31:37.280
 be logging all the information that we're currently talking about. We're first starting

01:31:37.280 --> 01:31:39.720
 with a spreadsheet. You have to wave because I can't tell which

01:31:39.720 --> 01:31:43.440
 person was Becky. Okay. Thanks.

01:31:43.440 --> 01:31:50.560
 So currently we're starting with a list in Excel but ultimately we want to tie it down

01:31:50.560 --> 01:31:55.760
 to a map similar to this where you can pull it up and say well we received 50 complaints

01:31:55.760 --> 01:32:01.760
 in this in the last year or whatever it is. She's tasked to do that and track it and make

01:32:01.760 --> 01:32:07.160
 sure we're responding, make sure we're following up on some of these requests.

01:32:07.160 --> 01:32:15.280
 The next one back is Tracy Beck and she is a senior engineer there. She used to work

01:32:15.280 --> 01:32:20.920
 for development review in the development review department. She has text out background

01:32:20.920 --> 01:32:26.520
 so she's been working with text out for quite a while, has enough knowledge of all the text

01:32:26.520 --> 01:32:31.360
 out projects that have been in place. She will be addressing some of these concerns

01:32:31.360 --> 01:32:37.520
 as well as running some of the projects. Our new traffic person, traffic engineer is

01:32:37.520 --> 01:32:45.600
 Pam and she will be more focused on the signal timing parts, signal design, timing, operations,

01:32:45.600 --> 01:32:52.760
 signage and a lot of that. And yes, she was tasked to look at ADA wise what do we do with

01:32:52.760 --> 01:32:58.280
 the signals and walk signals in downtown. So it may be fixed even before we get there

01:32:58.280 --> 01:33:03.120
 with the temperatures. And then yes, Mark Oliphant who's not here

01:33:03.120 --> 01:33:08.640
 currently, that's another addition. And Mike and Betty have all seen him and probably met

01:33:08.640 --> 01:33:10.960
 him. He's great.

01:33:10.960 --> 01:33:15.080
 Welcome everyone. Yeah, and really glad to have you, so appreciate

01:33:15.080 --> 01:33:23.680
 your contributions. I think that's it. So at 1134 we will stand

01:33:23.680 --> 01:33:25.000
 adjourned. Great.