00:00:00.000 --> 00:00:02.879
Welcome to the work session meeting of planning and zoning

00:00:02.879 --> 00:00:05.519
commission for October 10th 2018.

00:00:06.240 --> 00:00:11.039
It is 439. We'll open up the work session at this time.

00:00:11.039 --> 00:00:13.679
Start out with clarification of agenda items

00:00:13.679 --> 00:00:19.190
for the meeting. There is no consent agenda, is that

00:00:19.190 --> 00:00:21.120
correct? No.

00:00:22.640 --> 00:00:26.719
Perfect. So the first item 3a is actually being postponed

00:00:27.839 --> 00:00:31.469
to a future date not determined yet. So the first item we

00:00:31.469 --> 00:00:35.840
can walk through will be 3b which is Julie

00:00:38.479 --> 00:00:40.240
z 18-14.

00:00:47.679 --> 00:00:49.520
Good evening. Evening Julie.

00:00:53.280 --> 00:00:56.289
All right I'm Julie Wyatt senior planner with the city and

00:00:56.289 --> 00:00:58.719
I am presenting z 18-14. It's a commercial

00:00:58.719 --> 00:01:02.539
rezoning to you tonight. So request before you is to hold a

00:01:02.539 --> 00:01:04.719
public hearing and consider making a

00:01:05.280 --> 00:01:09.239
recommendation regarding the rezoning from a pd 115

00:01:09.239 --> 00:01:12.480
district to an rcc district. The subject property

00:01:12.480 --> 00:01:17.609
is in the vicinity of loop 288 highway 77 also known as

00:01:17.609 --> 00:01:20.400
north elm and then bonnie bray and it's

00:01:20.400 --> 00:01:27.000
about nine acres. More specifically pd 115 a detail plan

00:01:27.000 --> 00:01:31.359
was approved for this pd back in 2004 for a

00:01:32.319 --> 00:01:37.590
church as well as the accessory daycare or school and that

00:01:37.590 --> 00:01:40.640
was approved and but it was never built.

00:01:40.640 --> 00:01:44.859
So now the applicant is coming forward. They're requesting

00:01:44.859 --> 00:01:46.799
a rezoning to develop the site with a

00:01:46.799 --> 00:01:53.120
mixed use center. Commissioner Ellis. Thank you chair. Hey

00:01:53.120 --> 00:01:54.879
Julie was that like brought into the

00:01:54.879 --> 00:01:58.510
pd after the fact or with the pd at the time? It's just so

00:01:58.510 --> 00:02:00.640
weird that the pd is nicely kind of

00:02:00.640 --> 00:02:03.239
carved out and then you've got that little piece. I was

00:02:03.239 --> 00:02:06.000
just curious. That is a good question. The

00:02:06.000 --> 00:02:09.330
pd actually included a lot more property. I think the

00:02:09.330 --> 00:02:12.080
property as it's gone forward has been zoned

00:02:12.080 --> 00:02:17.930
out of the pd. So now that I say that I'm questioning

00:02:17.930 --> 00:02:18.719
myself.

00:02:22.159 --> 00:02:25.990
Yeah I do think that was the I think that was the and I can

00:02:25.990 --> 00:02:28.719
I could verify that before the

00:02:28.719 --> 00:02:31.620
the meeting because it's a good question but that that I

00:02:31.620 --> 00:02:34.080
believe that there it was larger but it has

00:02:34.080 --> 00:02:36.960
has zoned out. I've got those documents. I'll just have to

00:02:36.960 --> 00:02:39.039
reference them. So it's a good question.

00:02:39.039 --> 00:02:46.349
I'll find out for you. So as with. Commissioner Beck. I'm

00:02:46.349 --> 00:02:48.319
thoroughly confused and I think it was

00:02:48.319 --> 00:02:56.080
just a misprint. I've got this one that says z1814 and then

00:02:56.080 --> 00:02:59.759
the actual background information it says

00:02:59.759 --> 00:03:04.919
z180011. Was that a typo or something? It is a typo. I

00:03:04.919 --> 00:03:07.520
apologize. Okay all right so I've got the right stuff.

00:03:07.520 --> 00:03:10.129
You have the right thing. I have the wrong project number

00:03:10.129 --> 00:03:11.439
at the front. I got a little

00:03:11.439 --> 00:03:16.240
excited about a different project. So no you're correct. So

00:03:16.240 --> 00:03:18.159
it's z1814. Yes.

00:03:22.960 --> 00:03:25.110
So as with all rezoning cases we look at the criteria for

00:03:25.110 --> 00:03:27.280
approval in sub chapter 3 of the

00:03:27.280 --> 00:03:29.479
debt and development code. First does it comply with the

00:03:29.479 --> 00:03:31.599
future land use and then second does it

00:03:31.599 --> 00:03:34.270
is there adequate provision of the transportation water

00:03:34.270 --> 00:03:36.000
sewer those public infrastructure

00:03:36.800 --> 00:03:40.819
items. So first we'll look at the debt and plan 2030. This

00:03:40.819 --> 00:03:43.599
property is located in a business

00:03:43.599 --> 00:03:47.740
innovation designation future land use. As you know the

00:03:47.740 --> 00:03:50.479
intent is to provide for well-planned

00:03:50.479 --> 00:03:54.919
large scale employment parks as well as those accessory

00:03:54.919 --> 00:03:57.439
uses such as retail restaurant,

00:03:58.080 --> 00:04:02.139
higher density residential. RCCD in this instance is

00:04:02.139 --> 00:04:04.800
appropriate and in that business innovation

00:04:04.800 --> 00:04:08.699
because it would allow the property to develop with those

00:04:08.699 --> 00:04:11.919
complementary uses like those retail

00:04:11.919 --> 00:04:15.759
and and the commercial uses. RCC district is a primarily

00:04:15.759 --> 00:04:18.319
commercial district so it would allow

00:04:18.319 --> 00:04:22.899
those accessory use or those supporting uses. And that's

00:04:22.899 --> 00:04:25.680
important because this property is

00:04:25.680 --> 00:04:28.529
near more residential areas more institutional areas. You

00:04:28.529 --> 00:04:30.399
probably don't want to see large scale

00:04:30.399 --> 00:04:34.279
like industrial type uses so those supporting uses would be

00:04:34.279 --> 00:04:36.319
appropriate in this location.

00:04:36.319 --> 00:04:42.639
Additionally it's near the 377 or I'm sorry 77 and loop 288

00:04:42.639 --> 00:04:45.120
corridors so that those access

00:04:45.120 --> 00:04:48.750
and the roadways are the types of roadways you want to see

00:04:48.750 --> 00:04:50.639
near commercial areas to help them be

00:04:51.279 --> 00:04:56.759
successful. We also looked at the mobility for the area.

00:04:56.759 --> 00:04:59.759
Now on the screen is a concept plan. I just

00:04:59.759 --> 00:05:03.300
want to caution you that this is a straight rezoning. This

00:05:03.300 --> 00:05:05.199
is a concept plan that the applicant

00:05:05.199 --> 00:05:09.019
has provided as part of a trip generation analysis but this

00:05:09.019 --> 00:05:11.600
is an approval of this concept plan

00:05:11.600 --> 00:05:15.230
so that if if this zoning district was approved any of the

00:05:15.230 --> 00:05:17.920
uses that would be permitted in RCCD

00:05:17.920 --> 00:05:20.480
as well as the development scale would be permitted.

00:05:20.480 --> 00:05:22.480
Commissioner Ellis. Thank you chair.

00:05:22.480 --> 00:05:25.639
Julie that's for obviously outside of the scope of what we

00:05:25.639 --> 00:05:27.600
're looking at site wise right? Yes.

00:05:27.600 --> 00:05:30.629
Because they obviously own the land to the left. Yes yes

00:05:30.629 --> 00:05:32.399
and we'll talk about that. So

00:05:32.959 --> 00:05:36.269
so we did ask them to do a trip generation analysis as part

00:05:36.269 --> 00:05:39.279
of this request and and as part

00:05:39.279 --> 00:05:43.529
of that they actually looked at the entire 32 acres that is

00:05:43.529 --> 00:05:45.839
at this corner of loop 288

00:05:45.839 --> 00:05:51.459
and highway 77 because that is adjacent RCCD zoning so it

00:05:51.459 --> 00:05:54.879
would develop in a complementary way

00:05:54.879 --> 00:05:58.029
and I believe they are looking at developing that entire

00:05:58.029 --> 00:05:59.439
corner so they wanted to look at

00:05:59.439 --> 00:06:04.240
it comprehensively. However the request is only for this

00:06:04.240 --> 00:06:06.560
nine acres in in black so does that make

00:06:06.560 --> 00:06:12.189
sense? Okay. Commissioner Bec. Thank you chair. Just for

00:06:12.189 --> 00:06:14.720
fill me in a little bit I believe the new

00:06:14.720 --> 00:06:16.889
high school is going in this area too. We're gonna get

00:06:16.889 --> 00:06:19.759
there. Okay good thanks. If I don't answer

00:06:19.759 --> 00:06:22.980
your question let me know. Okay so so as part of a trip

00:06:22.980 --> 00:06:25.839
generation analysis they're they're using

00:06:25.839 --> 00:06:29.199
some land use assumptions and as part of that they they

00:06:29.199 --> 00:06:32.079
assumed 400 multifamily dwellings and

00:06:32.079 --> 00:06:37.050
122,000 square feet of retail. Based upon those assumptions

00:06:37.050 --> 00:06:39.600
the ITE trip generation manual

00:06:39.600 --> 00:06:44.160
anticipates a generated 9,800 trips for this property or

00:06:44.160 --> 00:06:46.959
for the entire 32 acres. The am peak

00:06:46.959 --> 00:06:51.769
hour trips of 391 and the pm peak hour of 833 and that's a

00:06:51.769 --> 00:06:55.600
lot of trips. When you combine that with

00:06:55.600 --> 00:06:59.639
Commissioner Beck's point about the Denton High School that

00:06:59.639 --> 00:07:01.839
is is anticipated to come in in this

00:07:01.839 --> 00:07:06.339
area and in about this location down here. You have the UNT

00:07:06.339 --> 00:07:09.040
Discovery Center already in place in

00:07:09.040 --> 00:07:13.069
this area. There is a townhome development coming in in

00:07:13.069 --> 00:07:16.079
this location. Multifamily. You have a

00:07:16.079 --> 00:07:19.709
regional park and then in in the near future you're also

00:07:19.709 --> 00:07:21.759
going to be seeing potentially a

00:07:21.759 --> 00:07:25.600
single-family development in this area. There's a lot going

00:07:25.600 --> 00:07:28.800
on and and because of that our city

00:07:28.800 --> 00:07:32.259
staff has already looked at some mobility improvements for

00:07:32.259 --> 00:07:34.720
for this general area and

00:07:34.720 --> 00:07:36.930
and particularly for Bonnie Bray. So you might be aware

00:07:36.930 --> 00:07:38.560
that Bonnie Bray is being improved on the

00:07:38.560 --> 00:07:42.379
south side of town between university and vintage. However

00:07:42.379 --> 00:07:44.560
because especially because of the Denton

00:07:44.560 --> 00:07:47.319
High School improvements it's now on the radar to go ahead

00:07:47.319 --> 00:07:49.920
and improve the north side of Bonnie Bray.

00:07:49.920 --> 00:07:53.740
So they are they are already working on the capacity and

00:07:53.740 --> 00:07:56.000
safety improvements storm water

00:07:56.000 --> 00:08:01.529
and utility locations for this area. The anticipated Bonnie

00:08:01.529 --> 00:08:03.120
Bray will be four lane

00:08:03.120 --> 00:08:07.029
divided arterial. Currently it's under design so the final

00:08:07.029 --> 00:08:09.920
alignment hasn't been determined. So

00:08:09.920 --> 00:08:13.740
you'll see there's a lot of green lines on this map. So

00:08:13.740 --> 00:08:17.680
here's Bonnie Bray now. The mobility plan

00:08:17.680 --> 00:08:21.889
shows it tracking in this location to the west. However

00:08:21.889 --> 00:08:24.959
after our engineering department has looked

00:08:24.959 --> 00:08:27.720
at it they feel like maybe tracking to the east is actually

00:08:27.720 --> 00:08:29.680
a better alignment. So they're they're

00:08:29.680 --> 00:08:33.500
actually looking at this. What they really want to do is

00:08:33.500 --> 00:08:36.159
hit three seven hit 77 at a right angle.

00:08:36.799 --> 00:08:39.809
Engineering doesn't like to see skews at intersections. It

00:08:39.809 --> 00:08:42.000
's less safe. So whatever the

00:08:42.000 --> 00:08:45.470
alignment it would need to hit 77 at a right angle and then

00:08:45.470 --> 00:08:48.399
and then track north. They're working

00:08:48.399 --> 00:08:51.519
with the North Central Texas Council of Governments. So COG

00:08:51.519 --> 00:08:53.519
is involved in this because it's a regional

00:08:53.519 --> 00:08:57.440
transportation issue. So it is on the radar and it is

00:08:57.440 --> 00:09:00.240
moving forward. We do anticipate that the

00:09:00.240 --> 00:09:02.779
alignment's going to go in this direction but we don't know

00:09:02.779 --> 00:09:04.480
for certain and we won't know until the

00:09:04.480 --> 00:09:08.679
beginning of next year. The target construction is to begin

00:09:08.679 --> 00:09:12.080
in late 2019 and then the completion is

00:09:12.080 --> 00:09:14.450
to coincide with the Denton High School. They really want

00:09:14.450 --> 00:09:16.240
to make sure that these are improvements are

00:09:16.240 --> 00:09:19.879
in place before that high school opens up and so that's

00:09:19.879 --> 00:09:23.759
anticipated for late 2021. Any questions

00:09:23.759 --> 00:09:28.559
on the mobility? Commissioner Smith. Thank you Chair. So

00:09:28.559 --> 00:09:30.879
the if engineering decides that the

00:09:30.879 --> 00:09:33.740
alignment needs to be off you know left or right or east or

00:09:33.740 --> 00:09:35.759
west however you want to look at this.

00:09:37.039 --> 00:09:39.610
They could essentially start using imminent domain to claim

00:09:39.610 --> 00:09:41.679
land that's outside of the right of way

00:09:41.679 --> 00:09:44.679
already to be able to realign the road. Is that what you're

00:09:44.679 --> 00:09:46.080
looking at and seeing?

00:09:46.080 --> 00:09:50.190
They might use several tools in their toolbox. So if

00:09:50.190 --> 00:09:53.759
properties along this alignment are platting

00:09:53.759 --> 00:09:56.549
there may be right of way dedication as part of a plat and

00:09:56.549 --> 00:09:58.559
as part of just the typical development

00:09:58.559 --> 00:10:03.070
process. This property here I believe is UNT property so

00:10:03.070 --> 00:10:05.200
they may work with UNT. To get a

00:10:05.200 --> 00:10:07.960
piece. And then and then Richard sounds like he wants to

00:10:07.960 --> 00:10:10.159
weigh in here. I guess I should ask not

00:10:10.159 --> 00:10:12.500
silly because I'm not really I don't really care about the

00:10:12.500 --> 00:10:14.080
I guess what I'm saying is that in

00:10:14.080 --> 00:10:17.080
in relation to specifically the case that we're hearing

00:10:17.080 --> 00:10:19.679
tonight we could be we could be voting

00:10:19.679 --> 00:10:23.320
on a zoning case that could end up having if the city

00:10:23.320 --> 00:10:25.919
engineers feel like the west alignment's

00:10:25.919 --> 00:10:28.039
better than the east alignment it could end up with a

00:10:28.039 --> 00:10:29.519
zoning case. We rezone this area

00:10:30.480 --> 00:10:32.379
but there's going to be a road through the middle of it and

00:10:32.379 --> 00:10:34.080
the applicant who's asking for this

00:10:34.080 --> 00:10:37.740
rezone their entire conceptual plan doesn't matter anymore

00:10:37.740 --> 00:10:40.000
and because now they got a road

00:10:40.000 --> 00:10:42.549
running right through the middle of there. I would say it's

00:10:42.549 --> 00:10:43.759
it's it's highly unlikely at

00:10:43.759 --> 00:10:47.789
at this point. We did have we did have a discussion earlier

00:10:47.789 --> 00:10:50.879
this week that I was in with with UNT on

00:10:50.879 --> 00:10:55.309
that on that coming through that parcel. In addition where

00:10:55.309 --> 00:10:58.320
that apartment complex is one of

00:10:58.320 --> 00:11:01.950
the meetings we had with UNT recently there was a concern

00:11:01.950 --> 00:11:04.480
from from their police department about the

00:11:05.519 --> 00:11:08.860
crossing of students back and forth from that apartment

00:11:08.860 --> 00:11:11.360
complex to to their facility there

00:11:11.360 --> 00:11:15.399
and the necessity for for a light. This would would help

00:11:15.399 --> 00:11:17.759
alleviate some of that. In addition

00:11:17.759 --> 00:11:20.570
if it was tracking west it was like we're talking about a

00:11:20.570 --> 00:11:24.240
hurricane there were there were two I

00:11:24.240 --> 00:11:26.950
believe there were two spots where they were going to have

00:11:26.950 --> 00:11:28.399
to install a bridge two different

00:11:28.399 --> 00:11:31.409
bridges. Okay so it's pretty stupid and and so the just the

00:11:31.409 --> 00:11:33.360
cost and maintenance associated with it

00:11:33.360 --> 00:11:35.809
so that's that's where it kind of shifted to this. I just I

00:11:35.809 --> 00:11:37.200
would hate to see us be like well we

00:11:37.200 --> 00:11:39.299
could go we can go east we can go west here it's like well

00:11:39.299 --> 00:11:41.840
why would we want to just go through and

00:11:41.840 --> 00:11:43.879
have this applicant go through all the trouble getting this

00:11:43.879 --> 00:11:45.519
rezone just for the city to say hey

00:11:45.519 --> 00:11:48.070
by the way we're gonna blow our road through the middle of

00:11:48.070 --> 00:11:49.679
your plot now. Yeah and we've kind of

00:11:49.679 --> 00:11:52.110
have have had this applicant bringing this forward we've

00:11:52.110 --> 00:11:54.000
kind of have it have had it on hold

00:11:54.000 --> 00:11:55.690
okay for that for that very reason we don't want to get

00:11:55.690 --> 00:11:56.799
down the line and all of a sudden

00:11:57.600 --> 00:12:00.879
got ruined their dream. Commissioner Beck. Thank you chair.

00:12:00.879 --> 00:12:03.600
The green line on the other side of 77

00:12:03.600 --> 00:12:06.789
that's supposed to be a continuation of body ground? Well I

00:12:06.789 --> 00:12:08.879
drew that so it's definitely very

00:12:08.879 --> 00:12:15.190
conceptual. Okay but the intent is to go is to go north and

00:12:15.190 --> 00:12:18.240
and and but it doesn't connect you'd

00:12:18.240 --> 00:12:22.639
have to go up and down. I don't know where they're okay got

00:12:22.639 --> 00:12:27.279
cha. Julie real fast can you go back to

00:12:27.279 --> 00:12:31.500
their site plan? Sure. Okay I I know it's conceptual but I

00:12:31.500 --> 00:12:33.840
just want to make sure that they weren't

00:12:33.840 --> 00:12:37.470
dependent on the Bonnie Bray access if it potentially gets

00:12:37.470 --> 00:12:38.799
moved but it looks like they're

00:12:38.799 --> 00:12:43.600
gonna have theoretically access directly from 77 so if that

00:12:43.600 --> 00:12:46.159
if Bonnie Bray gets shifted to the right

00:12:46.159 --> 00:12:49.789
they're not going to necessarily lose traffic to their

00:12:49.789 --> 00:12:52.159
their spot. They would have to work with

00:12:52.159 --> 00:12:55.200
engineering regarding but regarding any access but probably

00:12:55.200 --> 00:12:57.679
their main access would be from 77. I

00:12:57.679 --> 00:13:00.230
think that's probably the most logical place it's the

00:13:00.230 --> 00:13:02.320
largest road. And then back on the slide that

00:13:02.320 --> 00:13:05.809
you were you were on to the mobility plan none of the three

00:13:05.809 --> 00:13:08.080
I want to go with cone of uncertainty.

00:13:10.240 --> 00:13:13.240
None of those three options the west the existing or the

00:13:13.240 --> 00:13:15.840
east hit at a 90 degree so it seemed like

00:13:15.840 --> 00:13:19.129
you'd come up to the highway and and make it a 90 degree if

00:13:19.129 --> 00:13:21.440
that is the case for all three options

00:13:21.440 --> 00:13:24.169
why are we moving Bonnie Bray east or west why don't we

00:13:24.169 --> 00:13:27.759
just leave it where it is? Well I think

00:13:27.759 --> 00:13:32.000
they're trying to get it closer to that 90 degree. It may

00:13:32.000 --> 00:13:34.960
not be perfectly unskewed but to have to

00:13:34.960 --> 00:13:37.960
have it closer to that 90 degree right now if you've driven

00:13:37.960 --> 00:13:39.919
Bonnie Bray you pretty much have to turn

00:13:39.919 --> 00:13:42.759
around to look to see if cars are coming so I think they're

00:13:42.759 --> 00:13:44.320
trying to improve the safety

00:13:45.519 --> 00:13:50.100
at that intersection by getting it by getting it as close

00:13:50.100 --> 00:13:52.960
to that 90 degree as possible.

00:13:52.960 --> 00:13:57.200
Okay thank you. And I think that's also the case at loop 28

00:13:57.200 --> 00:13:59.600
8 that they want a 90 degree intersection

00:13:59.600 --> 00:14:06.220
there as well as it goes north. All right so we also looked

00:14:06.220 --> 00:14:10.000
as part of the analysis at the

00:14:10.000 --> 00:14:13.169
current zoning pattern as well as the development pattern.

00:14:13.169 --> 00:14:15.039
The development pattern is you know

00:14:15.039 --> 00:14:18.389
there's not a lot of development out here yet. It's coming

00:14:18.389 --> 00:14:19.840
but it's not out here yet.

00:14:20.960 --> 00:14:24.590
So we look mainly at the zoning pattern and RCCD is a

00:14:24.590 --> 00:14:26.559
logical extension of that existing

00:14:26.559 --> 00:14:30.990
zoning pattern. You can see along north loop 288 that there

00:14:30.990 --> 00:14:34.159
is that RCC. It's pretty consistent RCCD.

00:14:34.720 --> 00:14:37.610
So by approval of this of this request you could ensure

00:14:37.610 --> 00:14:40.559
consistent development both in permitted

00:14:40.559 --> 00:14:43.559
uses as well as development scale so that you'd have a

00:14:43.559 --> 00:14:46.080
harmonious development pattern along that

00:14:46.080 --> 00:14:50.309
area as the the parcels do develop. As it moves forward

00:14:50.309 --> 00:14:53.039
development would have to comply with all

00:14:53.039 --> 00:14:56.210
DDC requirements. That would include any tree preservation,

00:14:56.210 --> 00:14:58.000
buffer screening, tree canopy,

00:14:58.000 --> 00:15:01.230
site design, and lighting requirements. Right now this is

00:15:01.230 --> 00:15:03.200
this is kind of new frontier in the city

00:15:03.200 --> 00:15:06.350
of Denton so water and sewer aren't available so extensions

00:15:06.350 --> 00:15:08.559
would be required with any development.

00:15:10.559 --> 00:15:15.399
Notification was sent out. We haven't received any any

00:15:15.399 --> 00:15:16.399
responses.

00:15:18.399 --> 00:15:20.409
So based upon the criteria for approval and staff's

00:15:20.409 --> 00:15:22.320
analysis we do recommend

00:15:22.320 --> 00:15:25.120
approval of the request and I'll stand for any questions.

00:15:27.440 --> 00:15:30.480
I don't see any thank you Julie. All right thanks. Next

00:15:30.480 --> 00:15:35.519
item is 3C Z18-18A

00:15:36.240 --> 00:15:38.399
and Cindy Jackson will be presenting.

00:15:40.559 --> 00:15:52.960
Thank you. Let me bring up the presentation.

00:16:04.080 --> 00:16:10.399
Okay Z18-18 is a rezoning request. The applicant is

00:16:10.399 --> 00:16:13.759
requesting to rezone approximately 20.7

00:16:13.759 --> 00:16:18.049
acres of property from the NR4 zoning district to the NRMU

00:16:18.049 --> 00:16:21.759
12 zoning district. As you can see

00:16:21.759 --> 00:16:26.759
the property is actually south of McKinney and north of

00:16:26.759 --> 00:16:32.320
Trailhead and west of Lane.

00:16:33.919 --> 00:16:37.460
Just for reference here's the loop right here and here's

00:16:37.460 --> 00:16:38.320
McKinney right here.

00:16:42.320 --> 00:16:46.139
The request the the current site is zoned NR4 as you can

00:16:46.139 --> 00:16:49.440
see in this map. If the if this request

00:16:49.440 --> 00:16:53.740
is approved the proposed zoning NRMU 12 is an extension of

00:16:53.740 --> 00:16:55.919
the NRMU 12 that is located

00:16:55.919 --> 00:16:59.740
to the north of the site and you can also see there's NRMU

00:16:59.740 --> 00:17:02.159
12 located to the east of the site.

00:17:03.919 --> 00:17:09.150
The applicant has prepared a concept plan. The concept plan

00:17:09.150 --> 00:17:10.880
takes into account the topography

00:17:10.880 --> 00:17:16.039
as well as tree preservation on the site. The topography is

00:17:16.039 --> 00:17:17.839
this is kind of has some pretty

00:17:17.839 --> 00:17:22.740
interesting topography where there's a 28 foot difference

00:17:22.740 --> 00:17:25.680
between the area right in here and

00:17:25.680 --> 00:17:32.000
the perimeter area so it kind of goes up. The applicant is

00:17:32.000 --> 00:17:35.200
proposing townhouse development

00:17:35.200 --> 00:17:37.680
with a density of six dwelling units per acre that's

00:17:37.680 --> 00:17:40.079
approximately 120 townhouse units.

00:17:41.440 --> 00:17:45.869
The applicant is also proposing to preserve as many trees

00:17:45.869 --> 00:17:47.920
as possible. The minimum

00:17:47.920 --> 00:17:52.109
preservation requirement for the for this site is 12.5

00:17:52.109 --> 00:17:54.160
percent of protected trees.

00:17:54.160 --> 00:18:02.410
The purpose of the NRMU district is the the request is to

00:18:02.410 --> 00:18:02.720
facilitate the development of this

00:18:03.519 --> 00:18:06.880
townhouse. It's kind of different from regular townhouses

00:18:06.880 --> 00:18:09.200
that we you know other townhouses we've

00:18:09.200 --> 00:18:13.019
seen they're not platted on their own lot. This is going to

00:18:13.019 --> 00:18:15.119
be platted all on one lot. The units

00:18:15.119 --> 00:18:19.000
are going to be sold individually and the whole development

00:18:19.000 --> 00:18:21.119
will be considered common area.

00:18:21.119 --> 00:18:28.990
So it's kind of condo style. According to our code it's

00:18:28.990 --> 00:18:30.720
also multifamily so an SUP will be

00:18:30.720 --> 00:18:33.839
required after they have completed the zoning process.

00:18:33.839 --> 00:18:37.039
Cindy I realize this is the concept

00:18:37.039 --> 00:18:40.369
plan we're dealing with zoning but I did notice there's a

00:18:40.369 --> 00:18:43.359
contingency access to McKinney. Yes.

00:18:43.359 --> 00:18:49.269
That is being worked on or that is actually a concept plan.

00:18:49.269 --> 00:18:51.039
So the concept plan is going to be

00:18:51.039 --> 00:18:56.079
emergency service only EMS access only. The primary access

00:18:56.079 --> 00:18:57.920
will be from trailhead

00:18:58.880 --> 00:19:03.359
and then they would go down to Dutchess to get to the loop.

00:19:03.359 --> 00:19:07.200
And then just help me if you go back one

00:19:07.200 --> 00:19:11.019
slide if you went back yeah this later development here

00:19:11.019 --> 00:19:14.960
would that come back for separate SUP if they

00:19:14.960 --> 00:19:18.190
wanted to develop later on something down there. Right the

00:19:18.190 --> 00:19:20.400
applicant right now he's not he's not

00:19:20.400 --> 00:19:24.029
proposing anything on this this part of the property here.

00:19:24.029 --> 00:19:25.920
The applicant is waiting for the

00:19:27.279 --> 00:19:31.559
citywide rezoning and the new zoning code to see what's

00:19:31.559 --> 00:19:33.680
going to be permitted there and just then

00:19:33.680 --> 00:19:36.480
then we'll decide what to do there. Thank you.

00:19:41.279 --> 00:19:46.079
Okay. Mr. Cole. Quick question. Yeah. To the due north of

00:19:46.079 --> 00:19:49.359
that are those apartments being built?

00:19:49.920 --> 00:19:53.940
Yes. Right over here there are apartments are called I

00:19:53.940 --> 00:19:56.160
believe Majestic on McKinney

00:19:57.119 --> 00:20:00.940
and then over here is an electrical transmission site.

00:20:00.940 --> 00:20:04.000
Right here is a church and affiliated school

00:20:05.119 --> 00:20:09.150
and then over here are single family homes. This down here

00:20:09.150 --> 00:20:12.079
is a duplex subdivision

00:20:13.279 --> 00:20:18.150
and all of this over here is undeveloped. Just making sure

00:20:18.150 --> 00:20:20.400
I was at the right place. Okay.

00:20:22.000 --> 00:20:27.519
This is planning and zoning. Commissioner Sanchez. Yeah. On

00:20:27.519 --> 00:20:30.400
Lane Street what eventually is the city

00:20:30.400 --> 00:20:33.410
looking at to do with that particular street there? Well it

00:20:33.410 --> 00:20:35.200
's a private street so right now the city's

00:20:35.200 --> 00:20:41.829
not looking at doing anything to it. I mean as far as

00:20:41.829 --> 00:20:45.359
trying to utilize it in the future if it's a

00:20:45.359 --> 00:20:49.670
private street I mean I guess when I was looking at it I

00:20:49.670 --> 00:20:52.400
know okay so it's a private is there any

00:20:52.400 --> 00:20:56.029
way of the city getting access to that and trying to

00:20:56.029 --> 00:20:58.559
utilize it for eventual because you you don't

00:20:58.559 --> 00:21:02.190
have I just I was just wondering if you could extend that

00:21:02.190 --> 00:21:04.960
all the way into into this subdivision here

00:21:05.599 --> 00:21:09.779
so that you could be able to have more access or well exits

00:21:09.779 --> 00:21:12.960
out of that area. If you look at the

00:21:13.680 --> 00:21:16.930
concept plan we do have I mean the aerial map there is a

00:21:16.930 --> 00:21:20.319
dead end street right here that is city owned.

00:21:20.319 --> 00:21:23.329
Mockingbird? Yes. Is that going to be extended all the way

00:21:23.329 --> 00:21:25.920
too? I haven't I did not see anything on the

00:21:27.200 --> 00:21:32.349
the mobility plan for that to be extended. It is? Okay. But

00:21:32.349 --> 00:21:35.039
Lane it's been it's a private street

00:21:35.039 --> 00:21:37.380
it's always been a private street and it's privately

00:21:37.380 --> 00:21:39.200
maintained so the city does not have any

00:21:41.039 --> 00:21:44.670
vested interest in it right now. Okay okay. Commissioner

00:21:44.670 --> 00:21:47.279
Smith. Thank you chair. So you're

00:21:47.279 --> 00:21:50.369
just to go off what Commissioner Sanchez was saying a

00:21:50.369 --> 00:21:53.200
second ago. The uh he said is Trailhead

00:21:53.200 --> 00:21:55.779
there that's that's that's private or is that? No that's a

00:21:55.779 --> 00:21:57.599
public street. Okay so the connectivity

00:21:57.599 --> 00:22:00.690
the connectivity well so okay gotcha I know it's stubbed

00:22:00.690 --> 00:22:02.400
out I thought you were saying that that

00:22:02.400 --> 00:22:05.430
whole area down there is all private street. Oh no no no

00:22:05.430 --> 00:22:08.400
just Lane right here. You said if you

00:22:08.400 --> 00:22:11.279
want to go back one slide to the conceptual I'm not really

00:22:11.279 --> 00:22:13.440
looking at the no yeah there you go

00:22:13.440 --> 00:22:16.019
the I'm not really looking at the conceptual but the top

00:22:16.019 --> 00:22:19.359
left so the the northwest plot above it

00:22:19.359 --> 00:22:23.759
that's actually between the applicant and McKinney. What

00:22:23.759 --> 00:22:26.240
that plot of land is that happen to be owned

00:22:26.240 --> 00:22:30.809
by the applicant or is that just yeah? No this this is

00:22:30.809 --> 00:22:33.200
actually um this is actually going to be

00:22:33.200 --> 00:22:37.230
an apartment complex. It's almost done. Is it? Yeah. Okay I

00:22:37.230 --> 00:22:39.440
guess I yeah right and right here is

00:22:39.440 --> 00:22:42.250
the electrical transformer. Okay got it all right so there

00:22:42.250 --> 00:22:44.240
's apartment complex in front of it.

00:22:44.240 --> 00:22:46.640
Yep and and church right here. Church right there okay.

00:22:46.640 --> 00:22:48.880
That works thank you. We got a little bit of

00:22:48.880 --> 00:22:51.589
line but Commissioner Ellis. Thank you Chair real quick I

00:22:51.589 --> 00:22:53.680
assume there's plans to extend Dutchess at

00:22:53.680 --> 00:22:56.440
some point as well correct? Oh yes there that is on the

00:22:56.440 --> 00:22:59.920
mobility plan to extend. Commissioner Beck.

00:22:59.920 --> 00:23:04.119
Thank you Chair. So Lane isn't a part of this no project at

00:23:04.119 --> 00:23:06.240
all I got the indication even by

00:23:06.240 --> 00:23:09.880
his narrative that that was going to be so they're making a

00:23:09.880 --> 00:23:13.359
separate means of egress only between

00:23:13.359 --> 00:23:16.500
their development and McKinney and as an emergency. That's

00:23:16.500 --> 00:23:18.960
correct. That's it okay so otherwise the only

00:23:18.960 --> 00:23:21.529
way they can get in there is through Dutchess. That's

00:23:21.529 --> 00:23:23.759
correct. Until Mockingbird comes through.

00:23:23.759 --> 00:23:26.339
The applicant had a neighborhood meeting and at the

00:23:26.339 --> 00:23:28.480
neighborhood meeting there was concern

00:23:28.480 --> 00:23:33.839
expressed about the use of this area as a access way into

00:23:33.839 --> 00:23:37.279
the site by all of the residents because

00:23:37.279 --> 00:23:38.920
of the fact that it's going to go through the church

00:23:38.920 --> 00:23:43.279
parking lot. Therefore it is going to be

00:23:43.279 --> 00:23:47.970
EMS only. Say that again that last part. It's only going to

00:23:47.970 --> 00:23:50.319
be EMS emergency medical service.

00:23:51.119 --> 00:23:55.420
Okay thanks. Commissioner Sanchez. It was the same question

00:23:55.420 --> 00:23:58.319
she had about extending Dutchess so over

00:23:58.319 --> 00:24:02.730
the long period when Dutchess is extended they'll be able

00:24:02.730 --> 00:24:04.960
to go either east or west. That's correct.

00:24:04.960 --> 00:24:08.089
And that's that's basically where they'll be able to move

00:24:08.089 --> 00:24:09.759
more traffic out of that area.

00:24:13.279 --> 00:24:21.059
We're good. Okay as Julie mentioned we the criteria for

00:24:21.059 --> 00:24:22.799
approval of a zoning case

00:24:22.799 --> 00:24:25.880
is does the site request does the request conform to the

00:24:25.880 --> 00:24:27.839
future land use plan and would there be

00:24:27.839 --> 00:24:30.509
adequate provision of transportation water sewer

00:24:30.509 --> 00:24:34.240
infrastructure. The site is actually

00:24:35.519 --> 00:24:39.150
designated as moderate residential on the future land use

00:24:39.150 --> 00:24:42.240
map. The intent of moderate residential

00:24:42.240 --> 00:24:45.349
is to promote single family housing in small lots and it

00:24:45.349 --> 00:24:48.799
encourages town homes with a density of

00:24:48.799 --> 00:24:53.609
between four and twelve units per acre. As proposed the

00:24:53.609 --> 00:24:56.799
site does meet that requirement and it does

00:24:56.799 --> 00:25:01.859
comply with the future land use map. Here's a little bit of

00:25:01.859 --> 00:25:04.880
my analysis. It's consistent with

00:25:04.880 --> 00:25:09.680
the future land use element. The NRMU 12 district permits

00:25:09.680 --> 00:25:12.880
12 dwelling units per acre max which is

00:25:12.880 --> 00:25:17.559
also consistent with that element and the thing that the NR

00:25:17.559 --> 00:25:21.119
MU 12 also does is provide a transition

00:25:21.680 --> 00:25:27.039
between the single family duplexes to the south and the

00:25:27.039 --> 00:25:29.680
more commercial and institutional uses

00:25:29.680 --> 00:25:32.400
that are along McKinney street to the north.

00:25:35.200 --> 00:25:36.970
The requested NRMU 12 district as I mentioned earlier is a

00:25:36.970 --> 00:25:40.000
continuation of the NRMU 12 that is

00:25:40.000 --> 00:25:43.599
located to the north of the site. The use is permitted in

00:25:43.599 --> 00:25:45.920
the NRMU 12 district are consistent

00:25:45.920 --> 00:25:49.069
with the uses that are permitted in the area today. Moder

00:25:49.069 --> 00:25:51.599
ate density residential uses with some light

00:25:51.599 --> 00:25:55.640
commercial. The applicant is only proposing town homes with

00:25:55.640 --> 00:25:56.799
no commercial.

00:26:01.279 --> 00:26:06.309
Um I just covered that. We sent out notices to uh by

00:26:06.309 --> 00:26:11.519
certified mail to 52 property owners and uh

00:26:11.519 --> 00:26:15.089
we received one response back which I handed out if I put

00:26:15.089 --> 00:26:16.480
it at your place tonight

00:26:17.519 --> 00:26:20.710
in favor which represents a half of one percent of the

00:26:20.710 --> 00:26:23.920
property located in the 200 foot buffer.

00:26:24.960 --> 00:26:30.569
Three signs were posted on the site at trailhead right here

00:26:30.569 --> 00:26:31.680
and at lane.

00:26:34.880 --> 00:26:37.829
Staff recommends approval of this request with the

00:26:37.829 --> 00:26:40.799
condition that a mixed use overlay

00:26:41.920 --> 00:26:45.740
is placed on the site. The mixed use overlay would limit

00:26:45.740 --> 00:26:47.440
the use of the site to townhouse

00:26:47.440 --> 00:26:50.170
development with a maximum density of six dwelling units

00:26:50.170 --> 00:26:53.440
per acre and it would limit that proposed

00:26:53.440 --> 00:26:56.740
northern access to emergency medical service only.

00:26:56.740 --> 00:26:59.200
Commissioner Smith. Have you discussed those

00:26:59.200 --> 00:27:04.000
recommendations with applicant? Um well we we did discuss

00:27:04.000 --> 00:27:07.119
them yes. Okay so any applicant will be

00:27:07.119 --> 00:27:09.569
there tonight to ask let us ask. Oh the applicant's right

00:27:09.569 --> 00:27:11.279
here. Well I guess I know we're not going to

00:27:11.279 --> 00:27:14.400
ask the applicant. I saw you look at him. I just uh don't

00:27:14.400 --> 00:27:16.400
don't see it's how the sausages are made.

00:27:16.400 --> 00:27:19.109
You can't can't let it all go away. We don't like to we don

00:27:19.109 --> 00:27:20.799
't like to do this without okay we'll ask

00:27:20.799 --> 00:27:22.920
this. We don't want to surprise the applicant. I'll ask the

00:27:22.920 --> 00:27:24.400
applicant tonight to make sure that he's

00:27:24.400 --> 00:27:28.000
okay with that the recommendations before me. Thank you.

00:27:28.000 --> 00:27:29.920
That concludes my my presentation.

00:27:30.799 --> 00:27:34.170
Commissioner Sanchez. I've got a question. Um when we

00:27:34.170 --> 00:27:37.279
usually develop when there's a development

00:27:37.279 --> 00:27:41.099
there's usually two exits if I remember correctly we

00:27:41.099 --> 00:27:43.839
usually try to have two exits. Now one of them

00:27:43.839 --> 00:27:47.769
is being designated as an emergency so in reality they only

00:27:47.769 --> 00:27:50.079
have one exit. Well you need to remember

00:27:50.079 --> 00:27:53.990
this is a concept plan. Okay okay. It's not it's not a full

00:27:53.990 --> 00:27:56.640
blown site plan. Okay okay. Which we

00:27:56.640 --> 00:28:00.109
will have a full blown site plan when he comes forward with

00:28:00.109 --> 00:28:02.880
the SUP application. Okay okay okay.

00:28:02.880 --> 00:28:06.920
I see what you're saying but I guess I my my idea is using

00:28:06.920 --> 00:28:09.119
that to make sure that they have two

00:28:09.119 --> 00:28:12.309
exits rather than even if it's a concept plan I would

00:28:12.309 --> 00:28:15.519
imagine you you would consider your other

00:28:15.519 --> 00:28:18.599
exit not just a concept plan that okay we're going to use

00:28:18.599 --> 00:28:20.799
this in emergency when in reality we have

00:28:20.799 --> 00:28:26.420
to have two primary exits not one. Yes yes. I do not see

00:28:26.420 --> 00:28:32.000
any other questions. Thank you Cindy. Great.

00:28:33.440 --> 00:28:36.630
With that the agenda for the public hearing has been

00:28:36.630 --> 00:28:39.119
complete. Move on to work session reports.

00:28:39.839 --> 00:28:46.720
The first one is from Haley about tree preservation and

00:28:46.720 --> 00:28:49.440
landscape standards.

00:28:54.960 --> 00:28:57.970
All right I've actually made it through the hard part with

00:28:57.970 --> 00:28:59.920
tree preservation so very brief

00:28:59.920 --> 00:29:02.079
presentation now with the landscape code update.

00:29:05.119 --> 00:29:07.460
All right so I'm sure you're all familiar through the ADPs

00:29:07.460 --> 00:29:09.359
and site plans that you've seen that

00:29:09.359 --> 00:29:12.039
sub chapter 13 of the development code does have landscape

00:29:12.039 --> 00:29:13.119
standards that dictate

00:29:13.759 --> 00:29:16.140
new plantings and where those go on a site and what form

00:29:16.140 --> 00:29:17.279
they should take.

00:29:18.000 --> 00:29:20.950
So with the comprehensive landscape plan and kind of this

00:29:20.950 --> 00:29:22.720
conservation code that we're hoping to

00:29:22.720 --> 00:29:25.430
adopt with our new DDC we are rewriting those landscaping

00:29:25.430 --> 00:29:26.960
standards to try to provide more

00:29:26.960 --> 00:29:30.589
flexibility in how a site is designed. So what we've

00:29:30.589 --> 00:29:33.440
proposed are new standards for compatibility

00:29:33.440 --> 00:29:35.789
buffers right-of-way screening and parking lot landscaping

00:29:35.789 --> 00:29:36.960
which are the chief elements

00:29:36.960 --> 00:29:41.859
that our code dictates on a site. As part of this we are

00:29:41.859 --> 00:29:44.720
looking to maintain the minimum landscape

00:29:44.720 --> 00:29:47.519
area and tree canopy area requirements that are currently

00:29:47.519 --> 00:29:49.279
in the code. As we shift to the new

00:29:49.279 --> 00:29:52.289
DDC and adopt new zoning districts of course these numbers

00:29:52.289 --> 00:29:54.000
would be adjusted to fit those new

00:29:54.000 --> 00:29:57.630
districts. We are tweaking this a little bit to require

00:29:57.630 --> 00:29:59.920
some biodiversity within the plantings

00:29:59.920 --> 00:30:04.349
on a site. So for example if a site has to have 50% tree

00:30:04.349 --> 00:30:06.640
canopy that would be broken down into

00:30:06.640 --> 00:30:09.660
numerous plantings all over the site and we would encourage

00:30:09.660 --> 00:30:11.920
that if you're planting over 10 trees to

00:30:11.920 --> 00:30:14.769
meet that requirement that no more than 20% of them be from

00:30:14.769 --> 00:30:16.160
the same genus so that there is

00:30:16.160 --> 00:30:18.970
biodiversity within a site and if something such as the you

00:30:18.970 --> 00:30:20.559
know ash borer beetle comes in it

00:30:20.559 --> 00:30:24.380
wouldn't wipe out all of the landscaping on a site. So just

00:30:24.380 --> 00:30:27.279
yes. Commissioner Sanchez. Yeah

00:30:28.480 --> 00:30:32.920
when you say no 20% now is there is there anything asking

00:30:32.920 --> 00:30:35.279
that a certain percent of those be native

00:30:35.279 --> 00:30:39.390
trees or trees local to north central Texas? Currently

00:30:39.390 --> 00:30:42.240
there's not anything that would require

00:30:42.240 --> 00:30:45.680
that. There the site design criteria manual has a listing

00:30:45.680 --> 00:30:48.079
of approved trees and the majority of the

00:30:48.079 --> 00:30:50.960
trees on there are considered native. So those that's the

00:30:50.960 --> 00:30:52.799
kind of the list that you could pick

00:30:52.799 --> 00:30:55.019
from so just by nature of that we do have a requirement but

00:30:55.019 --> 00:30:56.319
there's nothing spelled out in

00:30:56.319 --> 00:30:58.380
the code. We could certainly add something like that if you

00:30:58.380 --> 00:30:59.839
all were interested. When you say

00:30:59.839 --> 00:31:03.470
native you're talking about Texas or are you talking about

00:31:03.470 --> 00:31:05.359
north central Texas this area? I'm

00:31:05.359 --> 00:31:07.890
not sure how that list was derived to know where those

00:31:07.890 --> 00:31:09.759
those trees came from but that's that's

00:31:09.759 --> 00:31:12.339
definitely something we could look into and if you all

00:31:12.339 --> 00:31:14.400
would like us to add something like that to the

00:31:14.400 --> 00:31:19.539
code we could. I mean we're always talking about um what do

00:31:19.539 --> 00:31:22.240
you call it this is you know we're in

00:31:22.240 --> 00:31:26.140
order to talk about uh excuse me cross timbers and and how

00:31:26.140 --> 00:31:28.720
we want to mimic that ecosystem or

00:31:28.720 --> 00:31:32.539
what what you know we're keeping areas uh protecting areas

00:31:32.539 --> 00:31:35.119
because of those particular type trees

00:31:35.119 --> 00:31:38.119
then we should also extend it to protect as many of those

00:31:38.119 --> 00:31:40.480
trees as possible for this central for

00:31:40.480 --> 00:31:43.630
cross timbers area at least that's my opinion. Okay yeah.

00:31:43.630 --> 00:31:47.039
For clarification these tree tend trees

00:31:47.039 --> 00:31:50.670
is that like landscape trees? Correct. We're not talking

00:31:50.670 --> 00:31:52.640
about like the tree preservation of like

00:31:52.640 --> 00:31:56.269
the massive oaks necessarily we're talking about like great

00:31:56.269 --> 00:31:58.000
murals putting putting in for like

00:31:58.000 --> 00:32:01.630
landscape type. Yeah not necessarily the preferred species

00:32:01.630 --> 00:32:04.000
but certainly yeah new plantings on a side

00:32:04.000 --> 00:32:08.450
within the development area. Okay I got you. Also different

00:32:08.450 --> 00:32:11.039
from any required um mitigation tree

00:32:11.039 --> 00:32:13.869
that would be. Correct in addition to mitigation trees. I

00:32:13.869 --> 00:32:18.480
got you. So uh one of the key pieces of

00:32:18.480 --> 00:32:22.299
our landscape code is the compatibility buffer between uses

00:32:22.299 --> 00:32:24.240
um so our code currently has four

00:32:24.240 --> 00:32:27.670
types of buffers type A, B, and C or I'm sorry A, B, C, and

00:32:27.670 --> 00:32:30.000
D um and it dictates where those apply

00:32:30.000 --> 00:32:32.519
and it has very strict requirements for how wide those buff

00:32:32.519 --> 00:32:34.240
ers are how many trees and shrubs have

00:32:34.240 --> 00:32:37.559
to be within those buffers. Um we we often get you know

00:32:37.559 --> 00:32:40.000
concerns expressed by developers who

00:32:40.000 --> 00:32:42.140
find that those requirements are just a little too strict

00:32:42.140 --> 00:32:44.079
sometimes they need to be able to uh

00:32:44.079 --> 00:32:47.519
to fluctuate what goes in that buffer space. So this table

00:32:47.519 --> 00:32:49.119
is intended to help provide that

00:32:49.119 --> 00:32:52.470
flexibility so we're maintaining the same um you know the

00:32:52.470 --> 00:32:54.480
same spirit of what we have now in the

00:32:54.480 --> 00:32:57.650
code where the uses are are separate or the the development

00:32:57.650 --> 00:32:59.519
is separated by what type of use is

00:32:59.519 --> 00:33:02.339
being developed and what use is adjoining and then if you

00:33:02.339 --> 00:33:04.079
follow the table it would tell you

00:33:04.079 --> 00:33:05.890
how many points you would have to attain within your buffer

00:33:05.890 --> 00:33:07.759
. So we're trying to go to a more

00:33:07.759 --> 00:33:10.589
flexible system where we say you need this number of points

00:33:10.589 --> 00:33:12.319
here's a menu of options that can get

00:33:12.319 --> 00:33:15.369
you to that number. Um and then in many cases we do still

00:33:15.369 --> 00:33:17.440
specify a minimum width to ensure that

00:33:17.440 --> 00:33:19.900
there's adequate spacing between say an industrial and a

00:33:19.900 --> 00:33:24.000
single family use. Hayley? Correct. Uh

00:33:24.799 --> 00:33:28.619
where the uses line up there's none so agriculture and

00:33:28.619 --> 00:33:31.759
agricultural none single family single finger

00:33:31.759 --> 00:33:35.390
none single family single family but multifamily multif

00:33:35.390 --> 00:33:39.599
amily we put a buffer in for the same use

00:33:39.599 --> 00:33:43.470
can you wouldn't I think logically it'd be none just like

00:33:43.470 --> 00:33:46.240
the diagonal would suggest on this bingo

00:33:46.240 --> 00:33:50.480
chart but um can you help why is there a required buffer

00:33:50.480 --> 00:33:53.680
for the same use? I I believe that is an

00:33:53.680 --> 00:33:56.250
error in the table um but we can look into that the intent

00:33:56.250 --> 00:33:57.920
may have been if it's multifamily

00:33:57.920 --> 00:34:00.650
versus townhome uh this was recommended by our consultant

00:34:00.650 --> 00:34:03.759
Clarion with our code update um but I

00:34:03.759 --> 00:34:06.470
I see your point there that that um seems a little counter

00:34:06.470 --> 00:34:08.719
intuitive as to the agricultural the intent

00:34:08.719 --> 00:34:11.440
there is to if someone's doing agriculture on their land to

00:34:11.440 --> 00:34:13.119
not require them to buffer. I totally

00:34:13.119 --> 00:34:15.150
understand that one I was more worried about the yeah

00:34:15.150 --> 00:34:16.960
certainly we can I'll make a note of that and

00:34:17.519 --> 00:34:19.550
and we can look into that a little bit more I'm I'm not

00:34:19.550 --> 00:34:21.840
sure what the logic was there may just be a

00:34:21.840 --> 00:34:26.000
an error on the table. Okay thanks. So uh speaking of the

00:34:26.000 --> 00:34:29.760
the required points here is that kind of

00:34:29.760 --> 00:34:32.769
menu of choices that um that you would have to to get you

00:34:32.769 --> 00:34:35.440
to that required number of buffer points

00:34:35.440 --> 00:34:37.599
um and like I said the intent here is to add more

00:34:37.599 --> 00:34:40.079
flexibility so if if a wall suits your site better

00:34:40.079 --> 00:34:42.650
than a you know a certain number of trees and shrubs you

00:34:42.650 --> 00:34:44.400
know that that could be worked in as

00:34:44.400 --> 00:34:47.550
well as providing options for different sizes of trees um

00:34:47.550 --> 00:34:49.599
different you know spacing of trees and

00:34:49.599 --> 00:34:53.239
things of that nature. Are there any questions on this

00:34:53.239 --> 00:34:56.079
before we jump? All right um so just give you

00:34:56.079 --> 00:34:58.590
an example um so a multifamily developing and joining

00:34:58.590 --> 00:35:00.719
single family current code would be a type

00:35:00.719 --> 00:35:03.590
b buffer which has to be a 10 foot wide area with five

00:35:03.590 --> 00:35:06.719
trees and 30 shrubs for every 100 linear feet.

00:35:07.440 --> 00:35:09.409
If you go back to that table and kind of play with the

00:35:09.409 --> 00:35:11.519
options there are multiple ways to get to

00:35:12.079 --> 00:35:14.090
the required number of points that we would like to see in

00:35:14.090 --> 00:35:15.360
that buffer moving forward

00:35:16.159 --> 00:35:18.659
so that could be a masonry wall it could be a double-sided

00:35:18.659 --> 00:35:20.800
wood fence with trees or it could

00:35:20.800 --> 00:35:23.139
be some combination of trees and shrubs similar to the

00:35:23.139 --> 00:35:24.800
current code requirements so again just

00:35:25.679 --> 00:35:28.800
the goal here is to provide more flexibility. Some of the

00:35:28.800 --> 00:35:31.679
other changes we're looking for or

00:35:31.679 --> 00:35:34.690
looking to make in the code are applying a similar point

00:35:34.690 --> 00:35:37.039
system to all required site landscaping.

00:35:37.039 --> 00:35:39.929
Again the goal being to provide flexibility but ensure that

00:35:39.929 --> 00:35:41.840
a minimum quality of landscaping and

00:35:41.840 --> 00:35:45.210
a minimum amount of landscaping is provided. So what we've

00:35:45.210 --> 00:35:47.119
developed is a similar table to what

00:35:47.119 --> 00:35:50.150
we just looked at for buffers. If you read through the

00:35:50.150 --> 00:35:52.480
draft code you see that we require a minimum

00:35:52.480 --> 00:35:56.300
of 30 points on every landscape plan so every site has to

00:35:56.300 --> 00:35:59.840
meet this minimum and that minimum

00:35:59.840 --> 00:36:02.630
is attained by selecting elements from different sections

00:36:02.630 --> 00:36:04.239
on the menu board so there would be

00:36:04.239 --> 00:36:06.840
right-of-way screening, parking lot landscaping, and then a

00:36:06.840 --> 00:36:08.320
variety of other elements that could

00:36:08.320 --> 00:36:10.679
be incorporated throughout the site wherever works for

00:36:10.679 --> 00:36:15.039
their development. So looking at that table

00:36:15.039 --> 00:36:17.409
the first section as I mentioned would be right-of-way

00:36:17.409 --> 00:36:19.039
screening so the goal here is if you

00:36:19.039 --> 00:36:21.380
have parking in front of your building you would choose two

00:36:21.380 --> 00:36:23.679
of these options. If you don't have

00:36:23.679 --> 00:36:25.909
front parking you just have say a drive aisle or something

00:36:25.909 --> 00:36:27.199
in front of your building and that could

00:36:27.199 --> 00:36:30.360
be reduced to one. So kind of keeping with the spirit of

00:36:30.360 --> 00:36:32.880
our current code the options include berms,

00:36:33.599 --> 00:36:36.369
combination of trees, and then shrubs as well as low walls

00:36:36.369 --> 00:36:38.000
that could provide screening for the

00:36:38.000 --> 00:36:41.630
parking lot. Commissioner Beck. Thank you. How high are

00:36:41.630 --> 00:36:45.199
those berms? Three feet? It's it's they can

00:36:45.199 --> 00:36:48.210
vary it's typically like a one to three side slope maximum

00:36:48.210 --> 00:36:50.320
but it would be whatever height that's as

00:36:50.320 --> 00:36:54.460
low as one foot high. Yeah some of them are very low but

00:36:54.460 --> 00:36:57.280
okay yeah and typically you'll see the

00:36:57.280 --> 00:36:59.940
the low berm with the landscaping shrubs or something like

00:36:59.940 --> 00:37:01.039
that on top of it that provides

00:37:01.039 --> 00:37:04.860
a little extra height there. The second component of the

00:37:04.860 --> 00:37:08.000
table would be internal parking lot elements

00:37:08.000 --> 00:37:11.039
so you see here where the current code has very minimal

00:37:11.039 --> 00:37:13.599
standards for that only if you have a

00:37:13.599 --> 00:37:15.710
large front parking lot does our current code require

00:37:15.710 --> 00:37:18.320
internal landscaping. We have a minimum

00:37:18.320 --> 00:37:20.170
percentage of parking lot landscaping but it doesn't

00:37:20.170 --> 00:37:21.760
dictate that that should be spread throughout

00:37:21.760 --> 00:37:24.559
to provide shade over the parking lot so we want to

00:37:24.559 --> 00:37:27.199
encourage that concept but provide options and

00:37:27.199 --> 00:37:30.199
how you can do that so it could be a combination of end

00:37:30.199 --> 00:37:32.559
caps and internal landscape islands it

00:37:32.559 --> 00:37:35.340
could be landscape medians between rows of parking allowing

00:37:35.340 --> 00:37:37.119
the developer to choose whatever works

00:37:37.119 --> 00:37:39.840
best for their site but still attain landscaping dispersed

00:37:39.840 --> 00:37:43.199
throughout a parking lot. And then

00:37:43.199 --> 00:37:46.280
finally the the other landscape elements that we're

00:37:46.280 --> 00:37:48.480
proposing could be used on a site does

00:37:48.480 --> 00:37:51.150
include some some things such as encouraging drought

00:37:51.150 --> 00:37:53.599
tolerant plants, encouraging a minimum of

00:37:53.599 --> 00:37:56.960
turf grass usage on a site. Some of the newer things that

00:37:56.960 --> 00:37:58.719
we've added based on the committee

00:37:58.719 --> 00:38:02.349
on the environment's recommendations were things such as

00:38:02.349 --> 00:38:04.960
living walls and green roofs which we

00:38:04.960 --> 00:38:07.050
currently don't have addressed in our code at all so when

00:38:07.050 --> 00:38:08.719
someone proposes that it's kind of

00:38:08.719 --> 00:38:12.000
hard to see how it would apply. So allowing that to be a

00:38:12.000 --> 00:38:14.480
use and then the newest we've added is this

00:38:15.039 --> 00:38:17.380
butterfly pollinator garden you may have noticed that Dent

00:38:17.380 --> 00:38:20.480
on became a monarch city USA designation

00:38:20.480 --> 00:38:23.369
so to try to encourage that we've worked that into the code

00:38:23.369 --> 00:38:24.480
is one of the options.

00:38:25.280 --> 00:38:29.400
Commissioner Beck. Thank you chair. On the grass swells for

00:38:29.400 --> 00:38:31.199
surface water is the grass

00:38:32.320 --> 00:38:35.489
going to be drought resistant type grass or can it be Berm

00:38:35.489 --> 00:38:37.920
uda? It could be any grass.

00:38:40.960 --> 00:38:42.969
Certainly if you wanted us to encourage one way or the

00:38:42.969 --> 00:38:45.840
other we could work something like that in.

00:38:45.840 --> 00:38:51.449
Okay thanks. Finally the last piece of landscaping that we

00:38:51.449 --> 00:38:52.960
're still working on

00:38:53.760 --> 00:38:57.920
is open space requirements. Our code currently has these

00:38:57.920 --> 00:39:00.719
for multifamily uses only so we're looking

00:39:00.719 --> 00:39:03.489
into as we move forward and try to encourage cluster

00:39:03.489 --> 00:39:05.920
development as an option minimum landscape

00:39:05.920 --> 00:39:09.099
or minimum open space areas for that as well as maintaining

00:39:09.099 --> 00:39:11.360
our minimum open space for multifamily

00:39:12.480 --> 00:39:15.510
and kind of the overarching piece of this as I mentioned is

00:39:15.510 --> 00:39:17.119
our end goal is a combined

00:39:17.119 --> 00:39:19.909
conservation code that would include tree preservation

00:39:19.909 --> 00:39:21.760
landscaping and ESA. So with

00:39:21.760 --> 00:39:24.260
this draft landscape code we're also still working through

00:39:24.260 --> 00:39:26.960
how to apply credits for tree preservation

00:39:27.599 --> 00:39:29.989
and things like that and as well as credits for ESA and see

00:39:29.989 --> 00:39:32.000
how all of these pieces work together.

00:39:32.639 --> 00:39:34.590
So the end goal is not to be overly onerous but to

00:39:34.590 --> 00:39:37.039
encourage a high quality development with

00:39:37.039 --> 00:39:41.340
a multi-age tree canopy throughout the city. But that's all

00:39:41.340 --> 00:39:43.199
I had for you. I promise this would be

00:39:43.199 --> 00:39:46.260
the brief portion so unless there's any other questions we

00:39:46.260 --> 00:39:47.920
can move on to the next item.

00:39:49.760 --> 00:39:51.679
I think we're good. Thank you very much Haley. Thank you.

00:39:53.119 --> 00:39:57.519
Next up is Julie with a presentation on the comprehensive

00:39:57.519 --> 00:39:58.480
planning.

00:40:07.920 --> 00:40:09.869
All right. Third time's a charm. That's right. All right I

00:40:09.869 --> 00:40:16.320
also brought show and tell items.

00:40:16.320 --> 00:40:18.469
We've got some old comp plans over here if anybody's

00:40:18.469 --> 00:40:19.760
interested in looking at them

00:40:20.559 --> 00:40:20.559
they're pretty funny to look at so but you have to give

00:40:20.559 --> 00:40:29.199
them back. Okay so continuing on with our

00:40:29.199 --> 00:40:29.199
planning boot camp. We're talking about comprehensive

00:40:29.199 --> 00:40:36.559
planning tonight. So on our agenda is to first talk

00:40:36.559 --> 00:40:39.199
about how the Texas Local Government Code treats

00:40:39.199 --> 00:40:42.880
comprehensive planning. What is a comprehensive

00:40:42.880 --> 00:40:45.429
plan? What does the planning literature say about

00:40:45.429 --> 00:40:48.400
comprehensive plans? A brief history of comprehensive

00:40:48.400 --> 00:40:51.480
planning in Denton and then we're gonna we're gonna get

00:40:51.480 --> 00:40:55.679
into the Denton plan 2030. The parts of it,

00:40:55.679 --> 00:41:00.300
how to read it, places to look for information. So here we

00:41:00.300 --> 00:41:02.559
go. First we're going to talk about

00:41:02.559 --> 00:41:06.989
the Texas Local Government Code. So chapter 213 outlines

00:41:06.989 --> 00:41:09.199
municipal comprehensive plans.

00:41:09.920 --> 00:41:12.920
They're intended to promote health safety and welfare. A

00:41:12.920 --> 00:41:16.079
municipality can adopt a comprehensive

00:41:16.079 --> 00:41:19.940
plan but they're not required to do so. The content and

00:41:19.940 --> 00:41:22.079
design are fairly open-ended.

00:41:23.840 --> 00:41:26.369
Cities can talk about land use, transportation, other

00:41:26.369 --> 00:41:29.280
public facilities. They can organize it by

00:41:29.280 --> 00:41:33.099
subject or by geographical area and it can be used to

00:41:33.099 --> 00:41:35.760
coordinate and guide regulations.

00:41:35.760 --> 00:41:38.469
A municipality may define the relationship between the

00:41:38.469 --> 00:41:40.159
comprehensive plan and development

00:41:40.159 --> 00:41:44.280
regulations and comprehensive plans are adopted and amended

00:41:44.280 --> 00:41:46.800
by ordinance. So as we talked the last

00:41:46.800 --> 00:41:50.139
time comprehensive plans are our comprehensive plan is

00:41:50.139 --> 00:41:52.320
amended in the same way a zoning case

00:41:52.320 --> 00:41:55.039
would be amended in that it would require the public

00:41:55.039 --> 00:41:57.199
hearing and then a recommendation by

00:41:57.199 --> 00:42:00.840
peonzy and approval by council. So what does the planning

00:42:00.840 --> 00:42:03.679
literature say about comprehensive plans?

00:42:05.519 --> 00:42:09.400
So a little bit of history. One of the the fathers of

00:42:09.400 --> 00:42:12.320
planning, Daniel Burnham, he was a Chicago

00:42:12.320 --> 00:42:18.780
architect. He was the one who designed the 1893 Colombian,

00:42:18.780 --> 00:42:21.760
World Colombian Exposition. If you've

00:42:21.760 --> 00:42:25.610
heard of the white city where the buildings were all white

00:42:25.610 --> 00:42:29.599
and the waterways. So he designed that

00:42:30.239 --> 00:42:35.119
and then he also did the first comprehensive plan. It was

00:42:35.119 --> 00:42:37.840
the Chicago, the 1909 Chicago plan. So this

00:42:37.840 --> 00:42:40.570
was his quote. It's a little cliched in the planning

00:42:40.570 --> 00:42:42.559
profession but I love it. I think it's

00:42:42.559 --> 00:42:46.380
inspiring. They don't know if he actually said it. They

00:42:46.380 --> 00:42:48.880
think maybe one of his associates said it but

00:42:48.880 --> 00:42:52.929
I'm gonna I'm gonna let him have it. So make no little

00:42:52.929 --> 00:42:56.320
plans. There's Mr. Burnham himself. He had

00:42:56.320 --> 00:43:00.519
quite the mustache and there is a photo of the white city.

00:43:00.519 --> 00:43:03.039
So you might want to google it. There's

00:43:03.039 --> 00:43:06.960
there's lots of photos on the internet. It's no longer

00:43:06.960 --> 00:43:09.119
there and then here is one of the

00:43:09.119 --> 00:43:15.429
plates from the 1909 plan of Chicago. It talked, it looked

00:43:15.429 --> 00:43:17.280
at the park lands, it looked at

00:43:17.280 --> 00:43:20.920
transportation. It actually was a plan that included the

00:43:20.920 --> 00:43:23.679
central part of Chicago and extended out 60

00:43:23.679 --> 00:43:27.719
miles. So it was it was quite something. It took years to

00:43:27.719 --> 00:43:30.320
develop and he became the toast of the

00:43:30.320 --> 00:43:33.329
town and it was internationally known after it was adopted

00:43:33.329 --> 00:43:35.760
and then he died three years later. So

00:43:35.760 --> 00:43:40.250
it killed him I guess but so so there it is. So generally

00:43:40.250 --> 00:43:43.840
what is a comprehensive plan?

00:43:44.639 --> 00:43:47.090
John Levy defines it as a guide to the development of a

00:43:47.090 --> 00:43:47.679
community.

00:43:48.480 --> 00:43:50.840
The citizen's guide to planning says it is a way for the

00:43:50.840 --> 00:43:52.880
community to find where it has been,

00:43:52.880 --> 00:43:56.920
where it is, and where it wants to go. The Texas APA has

00:43:56.920 --> 00:44:00.000
six purposes of comprehensive planning

00:44:00.000 --> 00:44:03.219
process. First to improve the physical environment of the

00:44:03.219 --> 00:44:05.679
community as a setting for human activities.

00:44:06.239 --> 00:44:09.590
Second to promote the public interest. So not just special

00:44:09.590 --> 00:44:11.599
interests but the entire public.

00:44:12.719 --> 00:44:15.510
Third to facilitate the democratic determination and

00:44:15.510 --> 00:44:17.840
implementation of community policies on

00:44:17.840 --> 00:44:21.059
physical development. Four to affect political and

00:44:21.059 --> 00:44:23.760
technical coordination of community development.

00:44:24.559 --> 00:44:27.449
Five to inject long-range considerations in the in the

00:44:27.449 --> 00:44:30.159
determination of short-range actions.

00:44:30.800 --> 00:44:34.159
And finally to prove to bring professional and technical

00:44:34.159 --> 00:44:35.760
knowledge to bear in the making of

00:44:35.760 --> 00:44:39.980
political decisions. So it's pretty good pretty good list

00:44:39.980 --> 00:44:42.960
there. The citizen's guide to planning

00:44:42.960 --> 00:44:45.739
outlines what the different parts are or the typical parts

00:44:45.739 --> 00:44:47.280
are in a comprehensive plan. As

00:44:47.280 --> 00:44:49.750
the Texas Local Government Code says it could really be

00:44:49.750 --> 00:44:51.440
anything you want it to be but the

00:44:51.440 --> 00:44:54.530
planning literature kind of has these general parts. Some

00:44:54.530 --> 00:44:56.400
of them have them some of them don't

00:44:56.400 --> 00:44:59.400
but we'll go over them briefly. First the vision. It's the

00:44:59.400 --> 00:45:01.599
community's description of its future.

00:45:02.480 --> 00:45:05.239
In the past the vision was just maybe a couple of sentences

00:45:05.239 --> 00:45:07.440
. Our current comp plan is two pages

00:45:07.440 --> 00:45:11.969
of vision. So they've they've run the gamut. Research and

00:45:11.969 --> 00:45:14.719
analysis. There's several data

00:45:14.719 --> 00:45:17.219
points that planners look at and that communities look at

00:45:17.219 --> 00:45:19.119
when planning their comprehensive plans.

00:45:19.760 --> 00:45:23.110
First of all to look at the population characteristics. Who

00:45:23.110 --> 00:45:24.239
lives in our city?

00:45:24.239 --> 00:45:27.610
How old are they? Or what is what are their education level

00:45:27.610 --> 00:45:29.199
? What how much money do people

00:45:29.199 --> 00:45:32.199
make? Where do they live? And then how do those

00:45:32.199 --> 00:45:35.199
demographics affect how do they relate to the

00:45:35.199 --> 00:45:37.599
built environment particularly the housing market? That's

00:45:37.599 --> 00:45:40.480
that's important. And then economic trends.

00:45:41.679 --> 00:45:45.840
You know how does the internet affect retail development

00:45:45.840 --> 00:45:47.679
and where should retail go? So all

00:45:47.679 --> 00:45:51.500
of those elements can go into a comprehensive plan. Growth

00:45:51.500 --> 00:45:53.840
forecasts. Where where where do we

00:45:53.840 --> 00:45:56.480
think we're going to grow and and and how many?

00:45:56.480 --> 00:45:59.679
Environmental analysis. Where are natural features?

00:45:59.679 --> 00:46:03.000
Public facilities and infrastructure. Where are our fire

00:46:03.000 --> 00:46:05.199
stations and our police stations in our

00:46:05.199 --> 00:46:08.059
schools? And if we grow the way we think we're going to

00:46:08.059 --> 00:46:10.000
grow how many will we need and where

00:46:10.000 --> 00:46:13.630
should we put them? Land use capacity. How much undeveloped

00:46:13.630 --> 00:46:15.360
land do we have and how many people

00:46:15.360 --> 00:46:18.489
do we think are going to live in it? Community character

00:46:18.489 --> 00:46:20.719
analysis. These are the intangibles.

00:46:20.719 --> 00:46:23.889
When we think of Denton we think of arts and culture, music

00:46:23.889 --> 00:46:26.400
, the square, those intangibles

00:46:26.400 --> 00:46:29.559
that define our community. And the fiscal analysis. What

00:46:29.559 --> 00:46:31.679
are the implications of new growth?

00:46:31.679 --> 00:46:36.000
If we plan a community 10 miles away from the city center

00:46:36.000 --> 00:46:38.880
what will it cost to maintain the roads to

00:46:38.880 --> 00:46:41.679
get there and the water and the sewer? So all of those

00:46:41.679 --> 00:46:46.400
factors come into play. Goals, objectives,

00:46:46.400 --> 00:46:50.429
and policies are discussed in comprehensive plans. We they

00:46:50.429 --> 00:46:54.000
're all these three elements are typically

00:46:54.000 --> 00:46:56.409
in comprehensive plans but they name them different things

00:46:56.409 --> 00:46:58.079
and in fact our plan names it something

00:46:58.079 --> 00:47:01.670
different. But but generally the goals. What is the desired

00:47:01.670 --> 00:47:03.760
end state? Where do we want to go?

00:47:03.760 --> 00:47:06.320
What what do we want to be? Objectives. What are the

00:47:06.320 --> 00:47:08.880
benchmarks? How do we know we're getting there?

00:47:08.880 --> 00:47:12.130
And then the policies. What what action items do we have to

00:47:12.130 --> 00:47:13.599
take to get to our goal?

00:47:14.639 --> 00:47:17.030
All comprehensive well not all comprehensive plans but most

00:47:17.030 --> 00:47:18.719
comprehensive plans we see today have

00:47:18.719 --> 00:47:22.539
lots of maps and those are my favorite parts. Particularly

00:47:22.539 --> 00:47:25.360
our future land use map. And then

00:47:25.360 --> 00:47:29.800
implementation and monitoring. Other factors to consider in

00:47:29.800 --> 00:47:32.159
comp plans typically or I'm sorry

00:47:32.159 --> 00:47:35.050
comprehensive plans are a policy document. They they are

00:47:35.050 --> 00:47:37.199
different than the zoning code. The

00:47:37.199 --> 00:47:41.289
zoning code is our regulations. Our comp plan is our policy

00:47:41.289 --> 00:47:43.760
document that that informs our zoning

00:47:43.760 --> 00:47:47.679
code. Typically there's a 20 year horizon. We we plan 20

00:47:47.679 --> 00:47:49.840
years out but they should be updated

00:47:49.840 --> 00:47:53.659
every five years. Plan effects on the ground change and you

00:47:53.659 --> 00:47:55.519
want to continually update it.

00:47:56.400 --> 00:47:58.239
Planning documents and I'm going to say this later but

00:47:58.239 --> 00:48:00.880
planning the comprehensive planning is

00:48:00.880 --> 00:48:03.829
is not only a document it's not only a product it is a

00:48:03.829 --> 00:48:06.159
process and it's a continuous process.

00:48:07.920 --> 00:48:09.760
A brief history of comprehensive planning in Denton this is

00:48:09.760 --> 00:48:11.440
where it's going to get fun.

00:48:12.480 --> 00:48:15.489
So um in doing a little bit of research I don't know if

00:48:15.489 --> 00:48:17.280
this is a comprehensive list of

00:48:17.280 --> 00:48:20.369
comprehensive plans but it's what I could find. So the

00:48:20.369 --> 00:48:22.480
first one I found for the city of Denton was

00:48:22.480 --> 00:48:26.389
in 1960 and it's a pretty robust plan. Then there was

00:48:26.389 --> 00:48:31.199
another one in 1974. The 1999 plan was was

00:48:31.199 --> 00:48:33.989
what we used when I came to the city of Denton and then in

00:48:33.989 --> 00:48:36.960
2015 we adopted the Denton plan 2030.

00:48:38.320 --> 00:48:43.570
So in 1960 comprehensive plans are really good time caps

00:48:43.570 --> 00:48:46.320
ules of the zeitgeist of an area. They

00:48:46.320 --> 00:48:48.960
really talk about like how people feel about themselves and

00:48:48.960 --> 00:48:50.400
where they want to be so they're

00:48:50.400 --> 00:48:54.650
fascinating. This is a quote from the plan. "If some method

00:48:54.650 --> 00:48:56.960
of measuring intellectual level of

00:48:56.960 --> 00:49:00.510
a city were known Denton would be listed among the leaders

00:49:00.510 --> 00:49:04.079
in the nation." I love that. So um

00:49:04.880 --> 00:49:07.730
so that is the basis of that plan. So this is their land

00:49:07.730 --> 00:49:09.679
use plan. As you could see Denton was

00:49:09.679 --> 00:49:12.769
a lot smaller in 1960. There wasn't as much development on

00:49:12.769 --> 00:49:14.239
the south side of town and certainly

00:49:14.239 --> 00:49:18.829
the preserve wasn't there. The the um the zoning ordinance

00:49:18.829 --> 00:49:21.840
that followed that comprehensive plan

00:49:21.840 --> 00:49:26.719
was in 1963 and um and it it kind of followed the the the

00:49:26.719 --> 00:49:29.920
planning principles of the day. We we had

00:49:29.920 --> 00:49:33.119
fair very few zoning districts and they were um they weren

00:49:33.119 --> 00:49:35.199
't mixed use districts. They were

00:49:35.199 --> 00:49:38.510
pretty Euclidean and we'll talk about that in our next um

00:49:38.510 --> 00:49:41.280
our next boot camp session is uh they

00:49:41.280 --> 00:49:45.320
really separated a lot of the uses. They had a thoroughfare

00:49:45.320 --> 00:49:47.920
plan too. This is pretty interesting.

00:49:47.920 --> 00:49:51.980
Denton had it one had a planned inner loop and it was right

00:49:51.980 --> 00:49:55.519
here and then here was the proposed

00:49:55.519 --> 00:49:59.760
outer loop. 35W wasn't there and the plan talks about it is

00:49:59.760 --> 00:50:02.239
at the southern end of the brand new

00:50:02.239 --> 00:50:07.150
I-35. So um I think the highway the federal highway was in

00:50:07.150 --> 00:50:10.480
1956 am I right? The that act.

00:50:10.480 --> 00:50:14.360
So I would imagine that 35 was was just about finished then

00:50:14.360 --> 00:50:17.760
. So um and then here there was a

00:50:17.760 --> 00:50:23.369
1960 downtown plan and this is so cool. They they proposed

00:50:23.369 --> 00:50:26.960
a pedestrian um mall right here. So this

00:50:26.960 --> 00:50:32.510
was going to be the pedestrian loop. Um they uh so here's

00:50:32.510 --> 00:50:35.199
City Hall West if y'all if y'all are

00:50:35.199 --> 00:50:39.730
familiar with that. This seems to be the city buildings um

00:50:39.730 --> 00:50:42.400
McKinney was going to dead in here.

00:50:42.400 --> 00:50:45.409
I believe this is the inner loop from what I can tell and

00:50:45.409 --> 00:50:47.360
so McKinney was going to dead in here.

00:50:47.360 --> 00:50:49.869
There's going to be all the city offices. There's going to

00:50:49.869 --> 00:50:51.039
be the pedestrian center.

00:50:51.840 --> 00:50:55.469
They they advocated for a facelift of the architecture.

00:50:55.469 --> 00:50:56.480
They felt that the buildings

00:50:56.480 --> 00:51:00.300
were too drab so they thought they should be modernized. So

00:51:00.300 --> 00:51:02.079
just looking at some of those

00:51:02.079 --> 00:51:04.800
buildings on the square that got the facelift in the 60s

00:51:04.800 --> 00:51:06.239
you kind of see what they were

00:51:06.239 --> 00:51:09.440
talking about. They really wanted those modern facades.

00:51:12.159 --> 00:51:14.050
And um City Hall West according to that plan did not have

00:51:14.050 --> 00:51:16.480
air conditioning. So we could be having

00:51:16.480 --> 00:51:19.769
these meetings in an air conditioned environment. So

00:51:19.769 --> 00:51:22.000
luckily they did update some of it.

00:51:23.840 --> 00:51:26.519
The 1974 plan didn't have as many maps but I did want to

00:51:26.519 --> 00:51:28.400
pull a couple of the goals.

00:51:29.039 --> 00:51:31.840
I like the land use goal that wanted to provide adequate

00:51:31.840 --> 00:51:34.159
but not excessive amounts of all types

00:51:34.159 --> 00:51:38.650
of land for community needs. They they talked about the

00:51:38.650 --> 00:51:40.960
environment but they talked about they

00:51:40.960 --> 00:51:43.300
they defined it a little differently than we define it now.

00:51:43.300 --> 00:51:44.719
They talk about plan protect and

00:51:44.719 --> 00:51:47.510
preserve the natural and man-made environment. So they

00:51:47.510 --> 00:51:49.119
defined it a little differently.

00:51:50.239 --> 00:51:52.019
At that time they were still talking about affordable

00:51:52.019 --> 00:51:54.800
housing. So some of those deal issues

00:51:54.800 --> 00:51:57.400
that we deal with today were still were still things were

00:51:57.400 --> 00:51:59.119
things that we dealt with even back

00:51:59.119 --> 00:52:02.760
then. And and one phrase that I really liked in this one it

00:52:02.760 --> 00:52:05.039
talks about maintaining constant

00:52:05.039 --> 00:52:08.719
surveillance of different of different things. It's uh.

00:52:11.280 --> 00:52:15.099
Isn't that funny like that's an odd phrase to use but that

00:52:15.099 --> 00:52:16.239
's what they used.

00:52:20.719 --> 00:52:25.659
Once again Zeitgeist. Um and then 1999 uh we updated the

00:52:25.659 --> 00:52:27.679
plan. The plan won an award. It was

00:52:27.679 --> 00:52:30.949
it was um it it and there's a copy of it over there if you

00:52:30.949 --> 00:52:32.639
want to flip through it.

00:52:32.639 --> 00:52:36.280
It was adopted in December on December 7th of 1999. It's

00:52:36.280 --> 00:52:38.000
actually the basis of our current

00:52:38.000 --> 00:52:41.630
Denton Development Code. So um where we had those those

00:52:41.630 --> 00:52:44.320
just few zoning districts in 1963. We had

00:52:44.320 --> 00:52:46.539
the residential. We had apartment. We had business and we

00:52:46.539 --> 00:52:49.440
had industrial. Um that that new code

00:52:49.440 --> 00:52:51.780
brought in mixed use districts and we talked about

00:52:51.780 --> 00:52:53.840
development scale and neighborhood scale

00:52:53.840 --> 00:52:57.170
versus regional scale and you can see that reflected in our

00:52:57.170 --> 00:52:59.440
current code. So so this plan

00:52:59.440 --> 00:53:03.760
really informed our code that we see today. This was the

00:53:03.760 --> 00:53:07.119
land use plan by the way. I can you can

00:53:07.119 --> 00:53:11.150
see that it's um you know it's still it's still pretty

00:53:11.150 --> 00:53:14.159
compact in in in Denton. Denton didn't

00:53:14.159 --> 00:53:17.980
pushing those boundaries ever ever more every year. So now

00:53:17.980 --> 00:53:21.360
let's look at the current comprehensive

00:53:21.360 --> 00:53:25.599
plan that we use. So at a glance uh the the update was

00:53:25.599 --> 00:53:29.440
initiated in 2012 and it was an update of that

00:53:29.440 --> 00:53:33.079
1999 plan. It was developed in five phases. They had

00:53:33.079 --> 00:53:35.920
significant community involvement throughout.

00:53:35.920 --> 00:53:38.630
There were three guiding groups. The Citizens Advisory

00:53:38.630 --> 00:53:40.719
Committee, Technical Advisory Committee,

00:53:41.280 --> 00:53:46.159
Denton and then um Denton 2030. Then plan 2030 Ambassadors.

00:53:46.159 --> 00:53:48.800
Um they also did surveys. They had

00:53:48.800 --> 00:53:53.599
kickoff meetings. Um they did uh outreach to stakeholders.

00:53:53.599 --> 00:53:55.679
So there they they really worked

00:53:55.679 --> 00:53:59.500
on a robust um public outreach. It was adopted by ordinance

00:53:59.500 --> 00:54:02.800
in February of 2015 and just to give you

00:54:02.800 --> 00:54:07.710
a little um a little taste of of their projections. They

00:54:07.710 --> 00:54:10.480
they uh projected that the population in

00:54:10.480 --> 00:54:14.300
Denton would increase to over 200,000 people by 2030. So

00:54:14.300 --> 00:54:16.159
that that's a pretty substantial increase.

00:54:18.400 --> 00:54:21.590
So we've talked about the planning literature and what the

00:54:21.590 --> 00:54:23.679
what the standards are for comprehensive

00:54:23.679 --> 00:54:27.309
plans. But now let's talk about how to read our plan. So

00:54:27.309 --> 00:54:29.440
our community vision statement. Before I

00:54:29.440 --> 00:54:32.059
say that, does everyone here have a copy of the

00:54:32.059 --> 00:54:36.800
comprehensive plan? If you do not, we can get you

00:54:36.800 --> 00:54:41.199
one. Okay. How many have read the vision statement? All

00:54:41.199 --> 00:54:44.159
right. Good. If you haven't, if you haven't

00:54:44.159 --> 00:54:48.420
had an opportunity yet, it's on pages 14 and 15 of of the

00:54:48.420 --> 00:54:50.960
um comprehensive plan. The comprehensive

00:54:50.960 --> 00:54:54.590
plan also includes 10 elements. Those are chapters and

00:54:54.590 --> 00:54:56.800
those include things like the framework of the

00:54:56.800 --> 00:55:01.929
plan, the land use, housing, the mobility, infrastructure.

00:55:01.929 --> 00:55:03.840
So it it includes a lot of

00:55:03.840 --> 00:55:07.099
elements as it comes to to what the city is and what what

00:55:07.099 --> 00:55:10.639
we want it to be. Um each element

00:55:10.639 --> 00:55:14.460
contains some of those some of those points that we talked

00:55:14.460 --> 00:55:17.039
about earlier. The research and analysis,

00:55:17.039 --> 00:55:20.280
which are the basis for the conclusions. And then those

00:55:20.280 --> 00:55:22.960
goals, it has goals, policies, and actions.

00:55:23.599 --> 00:55:25.940
But those are those three elements we talked about earlier.

00:55:25.940 --> 00:55:27.119
The goals, objectives, and

00:55:28.000 --> 00:55:32.210
policies. So we call them goals, policies, and actions. And

00:55:32.210 --> 00:55:35.360
then earlier in the presentation,

00:55:35.360 --> 00:55:38.829
I called them goals, objectives, and policies. So they do

00:55:38.829 --> 00:55:41.920
the same thing. It also includes maps like

00:55:41.920 --> 00:55:45.070
the preferred growth map, existing land uses, future land

00:55:45.070 --> 00:55:47.360
use map. So let's talk about the vision

00:55:47.360 --> 00:55:51.019
first. So the vision statement, it was the result of all of

00:55:51.019 --> 00:55:53.119
that community outreach that I talked

00:55:53.119 --> 00:55:57.989
about. The surveys, the the meetings, the discussions with

00:55:57.989 --> 00:56:00.800
citizens, with policy makers, with with

00:56:01.440 --> 00:56:04.619
political leaders. And it's organized around four strategic

00:56:04.619 --> 00:56:06.719
directions, which include the character

00:56:06.719 --> 00:56:09.719
of Denton, our people, institutions, and government, the

00:56:09.719 --> 00:56:12.079
strength of the economy, and sound growth.

00:56:16.159 --> 00:56:19.980
Now we'll take at this is just a sample of of a chapter.

00:56:19.980 --> 00:56:22.719
What we'll talk about are the parts of

00:56:22.719 --> 00:56:25.739
the chapter. And this so this can go throughout the plan.

00:56:25.739 --> 00:56:28.000
As you read through it, you can you can

00:56:28.000 --> 00:56:30.639
pull out these these parts. So you kind of give you a

00:56:30.639 --> 00:56:33.360
roadmap to read it. So first of all, you

00:56:33.360 --> 00:56:35.800
know what chapter you're in, because it it talks about it

00:56:35.800 --> 00:56:37.599
here. So we're going to be looking at

00:56:37.599 --> 00:56:42.440
element two, which is land use. At the beginning of every

00:56:42.440 --> 00:56:45.360
chapter in this blue box will be the

00:56:45.360 --> 00:56:50.400
parts of the vision statement that are are reflected in the

00:56:50.400 --> 00:56:52.800
chapter. So in the land use

00:56:52.800 --> 00:56:55.619
chapter, of course, that those parts that the sound growth

00:56:55.619 --> 00:56:57.440
that that really is where that vision

00:56:57.440 --> 00:57:01.860
statement comes into play. There's research and analysis,

00:57:01.860 --> 00:57:04.639
there's tables and graphs throughout

00:57:04.639 --> 00:57:08.960
the the plan, which which give valuable information and

00:57:08.960 --> 00:57:12.480
also give you get wants to give you give you

00:57:12.480 --> 00:57:16.519
that supporting evidence for the conclusions. The goals are

00:57:16.519 --> 00:57:19.199
in the dark blue boxes. The plan

00:57:19.199 --> 00:57:22.289
states that they set a general direction and ideal future

00:57:22.289 --> 00:57:24.800
long range and comprehensive in nature

00:57:24.800 --> 00:57:28.619
and used to describe the desired result or outcome.

00:57:28.619 --> 00:57:34.079
policies are in the dark or in the bold.

00:57:34.960 --> 00:57:39.170
And they are a specific statement guiding decision makers a

00:57:39.170 --> 00:57:41.760
commitment to a particular course of

00:57:41.760 --> 00:57:45.789
action. They describe context and rationale of a desired

00:57:45.789 --> 00:57:47.920
outcome, and they're more specific than

00:57:47.920 --> 00:57:52.400
the goals. And then finally, the action statements are then

00:57:52.400 --> 00:57:55.199
underneath the policy statements.

00:57:55.840 --> 00:57:59.659
And those are those are specific steps to achieve those

00:57:59.659 --> 00:58:00.960
policy goals.

00:58:03.119 --> 00:58:06.940
So so as you're looking through through the comp plan, it

00:58:06.940 --> 00:58:09.760
flows first from the vision statement

00:58:09.760 --> 00:58:13.389
that sets the tone for every everything that we want to do

00:58:13.389 --> 00:58:16.400
within our community. Our goals relate

00:58:16.400 --> 00:58:19.500
to that vision statement in some capacity. And on this

00:58:19.500 --> 00:58:22.000
particular goal, it's to promote development,

00:58:22.000 --> 00:58:26.030
which enhances community character and functionality. The

00:58:26.030 --> 00:58:26.639
policies

00:58:28.880 --> 00:58:31.650
support the goals in this one, it's to set a high standard

00:58:31.650 --> 00:58:33.360
of quality design,

00:58:33.360 --> 00:58:36.000
equality in the design in the public realm to enhance the

00:58:36.000 --> 00:58:37.679
appearance and functionality.

00:58:37.679 --> 00:58:40.679
And then finally, those action items enhance design

00:58:40.679 --> 00:58:43.199
standards pertaining to aesthetics and

00:58:43.199 --> 00:58:46.210
complete streets for future construction of public rights

00:58:46.210 --> 00:58:47.519
of way and thoroughfares.

00:58:47.519 --> 00:58:51.340
So you can find this trail throughout our comprehensive

00:58:51.340 --> 00:58:52.719
plan in every element.

00:58:56.000 --> 00:58:57.380
One one part of the comp plan we look at a lot is the

00:58:57.380 --> 00:59:00.559
future land use map. But I thought we'd talk

00:59:00.559 --> 00:59:03.079
about how it was created because it didn't just spring from

00:59:03.079 --> 00:59:04.719
from nowhere, there was actually a

00:59:04.719 --> 00:59:08.079
process to create it. And it is the basis for the land use

00:59:08.079 --> 00:59:09.599
element for what we do.

00:59:10.559 --> 00:59:13.099
It was developed from public input, and it was derived from

00:59:13.099 --> 00:59:15.280
the preferred growth concept. So

00:59:15.920 --> 00:59:19.750
just to if you look on page 20 of your comprehensive plan,

00:59:19.750 --> 00:59:22.639
within part of the public outreach,

00:59:22.639 --> 00:59:27.050
they had they had alternative growth scenarios. One being

00:59:27.050 --> 00:59:29.760
if we did nothing, if we just kept going

00:59:29.760 --> 00:59:33.300
as usual, one if we only grew on the corridors, another if

00:59:33.300 --> 00:59:35.360
we grew at the centers, and then if

00:59:35.360 --> 00:59:39.449
we grew compactly. So as part of the public outreach, the

00:59:39.449 --> 00:59:41.840
public provided feedback on these

00:59:42.400 --> 00:59:45.199
on these gross scenarios. Richard and I were talking about

00:59:45.199 --> 00:59:47.599
it was interesting about what the

00:59:47.599 --> 00:59:51.420
land use assumptions were back in 2012. When this first

00:59:51.420 --> 00:59:53.760
started, was that the city was going to grow

00:59:53.760 --> 00:59:55.920
toward ropes and ranch, it was going to grow toward the

00:59:55.920 --> 00:59:58.480
southwest. And and really, that's not

00:59:58.480 --> 01:00:01.030
what we've seen. We've seen it really growing to the

01:00:01.030 --> 01:00:04.000
northeast and the east. So so even those

01:00:04.000 --> 01:00:07.820
assumptions that we used back then are have have changed.

01:00:07.820 --> 01:00:14.000
So so the this future land use map was

01:00:14.000 --> 01:00:17.010
derived from the preferred growth concept, which was based

01:00:17.010 --> 01:00:19.119
upon these alternative growth scenarios,

01:00:20.000 --> 01:00:23.150
the existing conditions, capacity studies, you know, where

01:00:23.150 --> 01:00:24.639
we had capacity to grow,

01:00:25.519 --> 01:00:28.360
community priorities, including things like walkability and

01:00:28.360 --> 01:00:29.760
trails that we wanted a mix

01:00:29.760 --> 01:00:33.400
of uses that we wanted jobs close to home, our community

01:00:33.400 --> 01:00:35.440
character, and then fiscal impact

01:00:35.440 --> 01:00:38.530
analysis, you know, compact growth is more fiscally sound

01:00:38.530 --> 01:00:40.639
because you have fewer roads and water and

01:00:40.639 --> 01:00:45.440
sewer to maintain. So so this is this is the future land

01:00:45.440 --> 01:00:48.800
use map that was created as as result of all

01:00:48.800 --> 01:00:51.679
of that input. I know we talk about a lot, we don't often

01:00:51.679 --> 01:00:53.599
see the entire future land use map.

01:00:53.599 --> 01:00:56.909
We usually just look at it in a more zoomed in point. But

01:00:56.909 --> 01:00:58.960
it's it's a it's a good exercise to

01:00:58.960 --> 01:01:01.300
kind of look at it because it really does reflect what that

01:01:01.300 --> 01:01:02.159
vision is of the city.

01:01:04.000 --> 01:01:06.059
Other items to keep in mind regarding comprehensive

01:01:06.059 --> 01:01:08.000
planning and our plan.

01:01:08.719 --> 01:01:11.980
The plan is comprehensive. So it is easy to get done all

01:01:11.980 --> 01:01:14.559
vision on that future land use map that

01:01:14.559 --> 01:01:17.809
is is really what we look at most on a day to day basis.

01:01:17.809 --> 01:01:20.480
But other goals, policies and actions can

01:01:20.480 --> 01:01:24.360
provide us direction. And it's in particularly when we're

01:01:24.360 --> 01:01:27.360
talking about design design items. So

01:01:27.360 --> 01:01:32.920
for instance, on page 183, it talks about it talks about to

01:01:32.920 --> 01:01:36.559
encourage new development to create

01:01:36.559 --> 01:01:39.929
pedestrian and bicycle friendly places. That's not

01:01:39.929 --> 01:01:42.480
necessarily a policy that we talk about when

01:01:42.480 --> 01:01:44.880
we're talking about straight zoning. But when you're

01:01:44.880 --> 01:01:47.039
talking about an SUP or an ADP, that

01:01:47.039 --> 01:01:49.380
certainly comes into play. So that's really vital

01:01:49.380 --> 01:01:51.199
information that we shouldn't ignore.

01:01:52.800 --> 01:01:55.139
And you know, Richard and I were talking about this. And

01:01:55.139 --> 01:01:57.280
when he first came, he got a copy of

01:01:57.280 --> 01:02:00.360
the comp plan, and he read through it, and he marked it up.

01:02:00.360 --> 01:02:02.000
And he teased out those policy

01:02:02.000 --> 01:02:06.039
directives, he teased out all that text, because that does,

01:02:06.039 --> 01:02:08.079
it does give context as to what we're

01:02:08.079 --> 01:02:12.280
doing. So it's important to, to look throughout to look at

01:02:12.280 --> 01:02:14.639
the plan as a whole and not just that

01:02:14.639 --> 01:02:18.670
future land use map. As I said before, comprehensive

01:02:18.670 --> 01:02:21.679
planning is as much a process as it is a product.

01:02:22.400 --> 01:02:25.989
Although we have these this document, we want to continue

01:02:25.989 --> 01:02:29.119
the process. And comp plans should be

01:02:29.119 --> 01:02:32.940
updated on a fairly regular basis. And just in terms of

01:02:32.940 --> 01:02:35.039
what we've seen in the in the city,

01:02:35.920 --> 01:02:38.719
Karen in our office did a land use analysis and rezoning

01:02:38.719 --> 01:02:42.159
cases from October 2016 to 2018

01:02:43.119 --> 01:02:47.170
could result top line if they if they developed at their

01:02:47.170 --> 01:02:49.679
maximum density with over 1400,

01:02:50.400 --> 01:02:54.030
or 14,000 new dwelling units within the city of Denton. But

01:02:54.030 --> 01:02:56.239
they're not always in the areas

01:02:56.239 --> 01:02:59.869
that we anticipated the growth in terms of that, those

01:02:59.869 --> 01:03:02.320
those future growth scenarios. So,

01:03:02.880 --> 01:03:06.510
so how do we address that? How do we address when the when

01:03:06.510 --> 01:03:09.280
the future land use map is not reflecting

01:03:09.280 --> 01:03:12.849
the the direction in which growth is going within the city

01:03:12.849 --> 01:03:17.039
of Denton? So and that's a question we'll

01:03:17.039 --> 01:03:21.590
we'll have to answer. Texas Local Government codes chapter

01:03:21.590 --> 01:03:24.639
211 says that zoning regulations

01:03:24.639 --> 01:03:27.650
must be adopted in accordance with the comprehensive plan.

01:03:27.650 --> 01:03:29.679
So how does that factor into that when we're

01:03:29.679 --> 01:03:33.309
seeing a lot of growth in areas we didn't anticipate and

01:03:33.309 --> 01:03:34.880
faster than we anticipated?

01:03:34.880 --> 01:03:37.699
Now how do how do we deal with that with our comprehensive

01:03:37.699 --> 01:03:39.519
plan? Julie, not that it applies

01:03:39.519 --> 01:03:42.789
to us. But if a comprehensive plan is optional, how does

01:03:42.789 --> 01:03:44.719
that code apply universally?

01:03:46.239 --> 01:03:49.909
If you adopt one, your zoning should follow your comp plan.

01:03:49.909 --> 01:03:51.440
If you don't adopt a comp plan,

01:03:52.719 --> 01:03:55.039
then free for all. Yep, whatever you want.

01:03:57.360 --> 01:04:03.710
Did you say Houston? So and Richard, I don't know if you

01:04:03.710 --> 01:04:05.840
want to add anything. No, one thing I just

01:04:05.840 --> 01:04:08.329
wanted to add because we've we've had this conversation as

01:04:08.329 --> 01:04:10.159
part of the the development code

01:04:10.159 --> 01:04:13.809
review committee. When we do have those inconsistencies

01:04:13.809 --> 01:04:15.360
with the with the rezone,

01:04:15.360 --> 01:04:17.699
you know, with the zoning and the land use. And where it

01:04:17.699 --> 01:04:19.599
gets particularly challenging is

01:04:19.599 --> 01:04:22.239
when we have a rural designation on the land use plan, you

01:04:22.239 --> 01:04:24.000
know, that's looked at it, you know,

01:04:24.000 --> 01:04:26.840
it's being planned at a density of one unit per five acres.

01:04:26.840 --> 01:04:29.519
Right. So that's point what point two

01:04:30.559 --> 01:04:33.840
units per per acre. And then we're, you know, we're rez

01:04:33.840 --> 01:04:36.880
oning those parcels, you know, four units an

01:04:36.880 --> 01:04:41.050
acre or six units an acre, which is a substantial increase.

01:04:41.050 --> 01:04:43.280
And so luckily, what we've done lately,

01:04:44.000 --> 01:04:47.840
as we're looking at at least some of these city initiated

01:04:47.840 --> 01:04:50.960
traffic studies, is still look at,

01:04:50.960 --> 01:04:53.460
you know, use that as the guide, but also step it back

01:04:53.460 --> 01:04:55.119
because we do have instances where

01:04:56.079 --> 01:04:59.119
there is that inconsistency. And so I think what's happened

01:04:59.119 --> 01:05:00.719
previously is, of course,

01:05:00.719 --> 01:05:03.059
everyone goes to the comp plan, because that's supposed to

01:05:03.059 --> 01:05:04.480
be your right, your guiding map.

01:05:04.480 --> 01:05:07.849
But the problem is, we have those we have those inconsisten

01:05:07.849 --> 01:05:10.159
cies. And so part of the discussion

01:05:10.159 --> 01:05:13.429
that we had is should we have those or should should the

01:05:13.429 --> 01:05:15.840
land use be consistent with the zoning

01:05:15.840 --> 01:05:19.710
prior? Should the land use change prior to the zoning? I

01:05:19.710 --> 01:05:21.679
know there are some cities in the

01:05:21.679 --> 01:05:26.090
Metroplex that require it. I think the example that we got

01:05:26.090 --> 01:05:28.960
as part of that meeting from from

01:05:28.960 --> 01:05:32.190
the outside our outside Land Use Council, she had

01:05:32.190 --> 01:05:35.199
referenced, I guess, a project she was involved

01:05:35.199 --> 01:05:38.500
with in Prosper, where they wanted to change the zoning on

01:05:38.500 --> 01:05:40.960
a parcel. However, the land use had it

01:05:40.960 --> 01:05:44.590
as rural. So prior to the, I guess it's a town, not the

01:05:44.590 --> 01:05:47.199
cities prior to the town, reviewing that

01:05:48.079 --> 01:05:50.550
rezoning application, they required them to change the land

01:05:50.550 --> 01:05:51.840
use plan and go and go through

01:05:51.840 --> 01:05:54.489
that process. And so I think that's just something to

01:05:54.489 --> 01:05:56.800
consider as we as we're, you know, thinking

01:05:56.800 --> 01:06:00.619
about all of this, as well as as how the new DDC functions,

01:06:00.619 --> 01:06:02.639
but again, also looking at this,

01:06:02.639 --> 01:06:05.960
because once once we move forward with that DDC, this will

01:06:05.960 --> 01:06:07.920
be right on its right on its heels,

01:06:07.920 --> 01:06:10.929
looking at sort of updating that, particularly the map, but

01:06:10.929 --> 01:06:12.400
also even some of the policies.

01:06:13.519 --> 01:06:17.340
Commissioner Smith. Thank you, Chair. So Richard and Julie

01:06:17.340 --> 01:06:19.599
as well, whenever we get cases that are

01:06:19.599 --> 01:06:21.679
like that, that is a I mean, I can't remember any off top

01:06:21.679 --> 01:06:23.440
my head. So I know they don't come often.

01:06:23.440 --> 01:06:26.449
But I think there's one I can think of specifically that

01:06:26.449 --> 01:06:28.400
was a part of the razor plot that was that

01:06:28.400 --> 01:06:32.219
was that was right there off Oak and 35 E and it was rez

01:06:32.219 --> 01:06:35.119
oning to build student housing, to build

01:06:35.119 --> 01:06:38.260
multifamily. I could see that in 2012, there could be a

01:06:38.260 --> 01:06:40.000
citizen who's involved in that in the

01:06:40.000 --> 01:06:43.010
comprehensive planning for the 2030 plan to see, well, that

01:06:43.010 --> 01:06:44.480
's all farmland, it's going to be

01:06:44.480 --> 01:06:46.699
farmland, there's not really a whole lot of thought that

01:06:46.699 --> 01:06:48.639
needs to be worried about multifamily going

01:06:48.639 --> 01:06:52.269
there. But then we rezone it. And it's, I guess the last

01:06:52.269 --> 01:06:54.159
time I saw I think we think we did the

01:06:54.159 --> 01:06:57.289
final plot already on it, it's built out there. You know,

01:06:57.289 --> 01:06:59.360
the concerns that are brought up of hey,

01:06:59.360 --> 01:07:03.210
this was thought of, and then the 30 plan, this was a rural

01:07:03.210 --> 01:07:05.440
district, this is a rural area.

01:07:05.440 --> 01:07:09.280
And we're going from drastic change and shift of use. I

01:07:09.280 --> 01:07:12.880
know that's brought up to say, this is not

01:07:12.880 --> 01:07:15.530
consistent with the didn't 2030 plan, it goes through, we

01:07:15.530 --> 01:07:17.199
have our presentations, because I've

01:07:17.199 --> 01:07:20.050
sat through enough of those. But I'd almost like to

01:07:20.050 --> 01:07:22.639
encourage as a commissioner to you, Julie,

01:07:22.639 --> 01:07:26.849
the rest of the planning staff of really making that a very

01:07:26.849 --> 01:07:29.519
strong point of saying that, no, no,

01:07:29.519 --> 01:07:32.539
not only is this not consistent, this is really not

01:07:32.539 --> 01:07:35.519
consistent. So do realize what you as a planning

01:07:35.519 --> 01:07:38.739
and zoning commission are about to do is going against

01:07:38.739 --> 01:07:41.199
something that we voted on, you know,

01:07:41.199 --> 01:07:44.780
three years ago, really, an idea that we put forth, because

01:07:44.780 --> 01:07:46.159
we sometimes may say, well,

01:07:46.159 --> 01:07:48.659
this seems like a good development, a good thing. And

01:07:48.659 --> 01:07:50.559
really, it's kind of goes back to I think what

01:07:50.559 --> 01:07:53.179
Andrew was asking, which was, how do we make sure that we

01:07:53.179 --> 01:07:55.199
don't, we as a commission, don't don't

01:07:55.199 --> 01:07:58.829
push the city to growing too fast, because cities can grow

01:07:58.829 --> 01:08:01.280
too fast, i.e. Houston, it can happen that

01:08:01.280 --> 01:08:04.289
way. And, and I think I think getting that getting almost

01:08:04.289 --> 01:08:06.400
that that that warning light that red flag

01:08:06.400 --> 01:08:09.519
saying, it's not that it's an inconsistent, you know, some

01:08:09.519 --> 01:08:11.280
mixed use and now it's residential

01:08:11.280 --> 01:08:13.769
or whatever else we're resigning it to, it's really

01:08:13.769 --> 01:08:15.760
inconsistent, just to really make sure

01:08:15.760 --> 01:08:18.109
it's being stressed to us, we know it's a big decision we

01:08:18.109 --> 01:08:19.600
're about to make. I'll get off my

01:08:19.600 --> 01:08:23.229
soapbox now. Yeah, supernata. Thanks. I just have a

01:08:23.229 --> 01:08:25.439
question on this. So when we talk about comprehensive

01:08:25.439 --> 01:08:27.609
planning, and everything and looking at the things that

01:08:27.609 --> 01:08:29.119
have come through in the last, you know, a

01:08:29.119 --> 01:08:32.239
couple of years, we see about, you know, you know, for over

01:08:32.239 --> 01:08:36.399
14,000 units possibly available. Yet one

01:08:36.399 --> 01:08:39.060
of the things that's becoming crisis in Denton is

01:08:39.060 --> 01:08:42.880
affordable housing. You know, increasingly, we have

01:08:42.880 --> 01:08:47.090
less housing that's available to a broad cross section of

01:08:47.090 --> 01:08:50.000
people. What, what is the city, what

01:08:50.000 --> 01:08:53.060
is it, you know, what do you what is, I guess, the approach

01:08:53.060 --> 01:08:55.680
in ensuring that as we grow, we create

01:08:55.680 --> 01:08:59.500
an environment in which we have a varied community that can

01:08:59.500 --> 01:09:01.600
live here and contribute to this.

01:09:02.399 --> 01:09:06.970
Well, we have a chapter for that. In our, in our

01:09:06.970 --> 01:09:10.880
comprehensive plan, in element seven talks about

01:09:10.880 --> 01:09:17.189
our housing policy and and and the the mix of housing that

01:09:17.189 --> 01:09:20.880
we need and then to make sure that

01:09:20.880 --> 01:09:23.699
not only we have the right mix, but that it's maintained

01:09:23.699 --> 01:09:25.840
and that we, you know, that and that

01:09:25.840 --> 01:09:28.729
our neighborhoods have good that we're any new

01:09:28.729 --> 01:09:32.239
neighborhoods are, you know, good quality. So

01:09:32.239 --> 01:09:34.430
you may want to take a look at that. I don't know if

01:09:34.430 --> 01:09:37.279
Richard wants to add to that. You know,

01:09:37.279 --> 01:09:41.100
it's a big discussion in the DCRC as well. No, and I think

01:09:41.100 --> 01:09:42.720
it just goes back to that,

01:09:42.720 --> 01:09:45.819
just not looking at the map in one chapter, really pulling

01:09:45.819 --> 01:09:48.079
out. And as we start to analyze this and

01:09:48.079 --> 01:09:51.710
talk about the, you know, is it consistent with the plan?

01:09:51.710 --> 01:09:53.840
Really looking at at the entire plan

01:09:53.840 --> 01:09:56.850
and how how it's either consistent or inconsistent, because

01:09:56.850 --> 01:09:58.479
there are there are a lot of other elements,

01:09:59.039 --> 01:10:03.439
particularly when we get into into utilities and level of

01:10:03.439 --> 01:10:06.880
service that that that starts to

01:10:06.880 --> 01:10:09.510
identify that and that's really what we what we should and

01:10:09.510 --> 01:10:11.279
how we should be using the plan, not

01:10:11.279 --> 01:10:14.810
just just one singular element, particularly particularly.

01:10:14.810 --> 01:10:16.800
It's different when there's a

01:10:16.800 --> 01:10:21.060
consistency. But when we have that that true inconsistency,

01:10:21.060 --> 01:10:22.880
I think that's where we really

01:10:22.880 --> 01:10:26.699
need to be a little bit more, you know, resourceful and

01:10:26.699 --> 01:10:30.880
staff and look at look at that whole that whole

01:10:30.880 --> 01:10:35.989
the whole plan, every element related to that. So I have a

01:10:35.989 --> 01:10:38.960
question that kind of piggybacks

01:10:38.960 --> 01:10:42.979
Commissioner Smith and Pernetta. We do a whole lot of

01:10:42.979 --> 01:10:46.239
zoning on the PNZ. We don't do a whole

01:10:46.239 --> 01:10:49.560
lot of planning, typically, just like the tasks that we're

01:10:49.560 --> 01:10:51.680
challenged with. It's more zoning than

01:10:51.680 --> 01:10:55.710
than planning. In the past, the two past comprehensive

01:10:55.710 --> 01:10:58.079
plans, there has been planning done.

01:10:59.039 --> 01:11:02.859
So I'm curious to know, in both iterations, it seems like

01:11:02.859 --> 01:11:05.199
the plan was or the forecast was to

01:11:05.199 --> 01:11:08.199
have growth to the southeast of town. Now it's in the

01:11:08.199 --> 01:11:12.159
northeast. Was there a disconnect in our

01:11:12.159 --> 01:11:15.010
our enforcement of the planning? Or is that a bad forecast?

01:11:15.010 --> 01:11:18.159
But it seems like if we planned in two

01:11:18.159 --> 01:11:22.760
comprehensive plans, that the growth would be southwest,

01:11:22.760 --> 01:11:25.199
don't we have some control over that

01:11:25.199 --> 01:11:29.250
to Commissioner Smith's point? Like what I don't want to

01:11:29.250 --> 01:11:32.159
ramble, but did we not encourage that? Or

01:11:32.159 --> 01:11:35.060
what happened to not know that where we planned growth to

01:11:35.060 --> 01:11:37.920
be, it's not happening? I think it's a

01:11:37.920 --> 01:11:40.930
I think it's a couple of things. I think part of it is, you

01:11:40.930 --> 01:11:42.880
know, a lot of the data that was used

01:11:42.880 --> 01:11:45.890
when and I'm not faulting it, it's just that point in time

01:11:45.890 --> 01:11:47.760
when we grab that data, and we came out of

01:11:47.760 --> 01:11:51.390
the recession. So the growth that we're having now, I don't

01:11:51.390 --> 01:11:53.279
think was ever anticipated back in

01:11:54.079 --> 01:11:58.479
2014. And so we had ropes and ranch and then there was a we

01:11:58.479 --> 01:12:01.439
had the one MPC I can't think of.

01:12:01.439 --> 01:12:05.260
Hunter? Is it Hunter Ranch? So we had some very large appro

01:12:05.260 --> 01:12:08.079
vals in that area. And so I think that's

01:12:08.079 --> 01:12:11.369
where it just kind of gravitated there, but also not not

01:12:11.369 --> 01:12:13.920
expecting the amount of growth that that

01:12:13.920 --> 01:12:17.449
that we're seeing. I mean, just a mere fact of 14, you know

01:12:17.449 --> 01:12:20.079
, the addition of 14,000 units just

01:12:20.079 --> 01:12:23.899
for rezoning, not saying they're going to be built over

01:12:23.899 --> 01:12:27.760
what was it? 2016? I mean, that is

01:12:29.680 --> 01:12:33.539
it's mind blowing, really. And just the amount of projects

01:12:33.539 --> 01:12:34.640
that we have ongoing,

01:12:35.279 --> 01:12:38.079
in addition to properties and annexing in. And so that's

01:12:38.079 --> 01:12:39.680
where it's kind of, hey, let's,

01:12:40.319 --> 01:12:42.409
let's make sure we're bringing as we bring this stuff

01:12:42.409 --> 01:12:44.720
forward. We're really, we're really analyzing

01:12:44.720 --> 01:12:48.079
this. Yeah. So I don't know if that answered the it

01:12:48.079 --> 01:12:49.840
certainly does. And I've brought it up before.

01:12:49.840 --> 01:12:53.470
And on other cases about how much do we look at the flume

01:12:53.470 --> 01:12:55.279
and stand by it. And it seems like

01:12:56.399 --> 01:13:00.560
conversations in the past couple years, it has been more of

01:13:00.560 --> 01:13:03.119
, I mean, it's pretty close to flume.

01:13:03.119 --> 01:13:07.149
But to Commissioner Smith's point, should it be hard and

01:13:07.149 --> 01:13:08.960
fast, like there was a vote, there was

01:13:08.960 --> 01:13:11.760
an approval, this is supposed to be low density, let's let

01:13:11.760 --> 01:13:14.239
's keep it rural or low density. And so

01:13:14.239 --> 01:13:18.350
that'd be my only thought throughout there. I got to piggy

01:13:18.350 --> 01:13:20.239
back off. Okay, Commissioner Smith.

01:13:22.880 --> 01:13:26.699
Just I didn't know if possibly there's a way for us to, as

01:13:26.699 --> 01:13:28.800
we are adding 14,000 dwellings, you know,

01:13:28.800 --> 01:13:33.210
14,000 units could sorry, could. And there was, we'll see,

01:13:33.210 --> 01:13:34.319
we'll go from there.

01:13:37.039 --> 01:13:40.960
Every two years building in some sort of parameter to just

01:13:40.960 --> 01:13:42.399
a benchmark, it doesn't seem like it's

01:13:42.399 --> 01:13:46.500
that hard to do just, but benchmarking, we project that by,

01:13:46.500 --> 01:13:48.800
I think it was, you know,

01:13:48.800 --> 01:13:51.579
they said project by 2030, we're gonna have, we're gonna be

01:13:51.579 --> 01:13:53.840
a population of 207,000 and change.

01:13:54.800 --> 01:13:57.329
But in the last two years, we've had four, we could add

01:13:57.329 --> 01:13:58.720
four, we've rezoned,

01:13:59.439 --> 01:14:04.479
Larry, don't punch me. We could add 14,000 new units, by

01:14:04.479 --> 01:14:06.800
the way, we rezoned it. Are we outpacing

01:14:06.800 --> 01:14:09.270
what their projection is? Because what I would hate to do

01:14:09.270 --> 01:14:10.880
as a planning and zoning commission,

01:14:10.880 --> 01:14:14.250
because we see it on such a microscopic level of does this

01:14:14.250 --> 01:14:16.399
make sense where it is now? Yeah,

01:14:16.399 --> 01:14:18.960
it's a little bit outside of the future land use map, but

01:14:18.960 --> 01:14:20.960
you know what? Seems like a good project.

01:14:20.960 --> 01:14:23.300
It's applicant seems like a nice guy. It's something we

01:14:23.300 --> 01:14:24.960
need. We need to get in there. Yeah,

01:14:24.960 --> 01:14:28.119
let's do it. But it's never, it's never the big things that

01:14:28.119 --> 01:14:31.119
kill you. It's the small hole in your

01:14:31.119 --> 01:14:34.260
boat that slowly drowns you and sinks you in your middle of

01:14:34.260 --> 01:14:36.640
the lake. And so I'd hate to be like,

01:14:36.640 --> 01:14:39.899
project by project, we start to outpace what our projected

01:14:39.899 --> 01:14:40.800
growth is. And then we

01:14:40.800 --> 01:14:44.619
have grown way too fast from what we projected or what we

01:14:44.619 --> 01:14:46.880
expected to. And we look back on it and

01:14:46.880 --> 01:14:50.510
we have a congested city and our utilities are, and it's

01:14:50.510 --> 01:14:53.039
not even the enjoyment of living, it's

01:14:53.680 --> 01:14:56.180
our utilities can't handle it. Our infrastructure hasn't

01:14:56.180 --> 01:14:58.000
caught up to it because our infrastructure

01:14:58.000 --> 01:15:00.850
and utilities are based off a 2030 plan. But the planning

01:15:00.850 --> 01:15:02.399
and zoning is in here looking at it and

01:15:02.399 --> 01:15:06.439
outpacing it by 30, 40%. That makes sense? It'd be nice to

01:15:06.439 --> 01:15:08.479
be able to get that benchmarking. So

01:15:08.479 --> 01:15:11.310
we know that we're not getting, and I'd hate to, once again

01:15:11.310 --> 01:15:13.039
, I have a soapbox, but I hate to get

01:15:13.039 --> 01:15:15.710
to the point where we're having to tell applicants, we're

01:15:15.710 --> 01:15:17.600
going to have to turn you down because we

01:15:17.600 --> 01:15:20.659
already approved somebody three weeks ago for something

01:15:20.659 --> 01:15:22.479
that could be really pushing us or

01:15:22.479 --> 01:15:24.939
pushing our dwellings. We should look at it on a case by

01:15:24.939 --> 01:15:26.880
case basis, but we as a planning and zoning

01:15:26.880 --> 01:15:30.699
commission need to be more abreast about this is, this

01:15:30.699 --> 01:15:33.520
could be pushing us faster growth than we need

01:15:33.520 --> 01:15:37.539
to go as a city because we're not truly able to settle into

01:15:37.539 --> 01:15:42.159
what we are. Sorry. Do you need a

01:15:42.159 --> 01:15:45.199
response or can we keep going? No, I don't need a response.

01:15:45.199 --> 01:15:49.199
I could, I could, Commissioner Sanchez.

01:15:49.920 --> 01:15:52.869
Commissioner Sanchez, you're up. I was just, I look at the

01:15:52.869 --> 01:15:55.840
comprehensive plan as a road map

01:15:55.840 --> 01:15:58.989
that doesn't necessarily have to be, you know, you're

01:15:58.989 --> 01:16:01.199
visiting every five years because you know

01:16:01.199 --> 01:16:04.350
there's things happening and things are changing and I don

01:16:04.350 --> 01:16:06.640
't see it as, you know, written in stone.

01:16:07.199 --> 01:16:10.829
You want to follow it as close as you can, but in the long

01:16:10.829 --> 01:16:12.720
term you have to be, that's why you go

01:16:12.720 --> 01:16:15.880
back to it every five years and maybe even every two years.

01:16:15.880 --> 01:16:18.079
I think at one time they said when we

01:16:18.079 --> 01:16:20.649
talked about the, you can't visit it as often as two years

01:16:20.649 --> 01:16:23.920
or something like that. It depends on

01:16:23.920 --> 01:16:26.930
the growth or what's happening in the city and I think that

01:16:26.930 --> 01:16:28.960
's the important thing is that it's,

01:16:28.960 --> 01:16:32.550
to me, it's a document that gives you direction but you don

01:16:32.550 --> 01:16:34.720
't hold it as a, you know, it's not

01:16:34.720 --> 01:16:37.939
written in stone. So based on what's going on in the city

01:16:37.939 --> 01:16:40.079
then you have to look at it and say okay

01:16:40.079 --> 01:16:43.119
this is, this is where the growth is going. This is where

01:16:43.119 --> 01:16:45.039
we have to look at it and not just say

01:16:45.039 --> 01:16:47.390
well this is where we should have grown and so we're going

01:16:47.390 --> 01:16:48.800
to force it this way because you're not,

01:16:48.800 --> 01:16:53.329
we're not going to force it. The developers and the people,

01:16:53.329 --> 01:16:55.760
the citizens are the ones that actually,

01:16:56.319 --> 01:16:59.609
you know, where they want to build is, so we have to take

01:16:59.609 --> 01:17:02.319
that into, if we become so rigid that this

01:17:02.319 --> 01:17:05.550
is what the comprehensive plan is and we don't adjust then

01:17:05.550 --> 01:17:08.079
we're going to find ourselves in a

01:17:08.079 --> 01:17:11.159
lot of trouble. I think we have to, it's something, it's a

01:17:11.159 --> 01:17:13.439
live document to me. It has to be looked at

01:17:13.439 --> 01:17:17.039
on a regular basis based on what's happening at that point

01:17:17.039 --> 01:17:19.199
and if you don't look at it constantly

01:17:20.000 --> 01:17:25.289
you're, you're up a creek. Just, I'm going to interject

01:17:25.289 --> 01:17:27.680
real fast so I know two commissioners

01:17:27.680 --> 01:17:30.390
are here. Commissioner Sanchez, I think at some point we as

01:17:30.390 --> 01:17:32.479
commission do need to force the issue.

01:17:32.479 --> 01:17:35.760
I understand it's a living document and, but at some point

01:17:35.760 --> 01:17:38.319
there were people before us that said

01:17:38.319 --> 01:17:40.270
this is the way we feel our city needs to go and we can't

01:17:40.270 --> 01:17:41.760
just override that and throw that out. We

01:17:41.760 --> 01:17:44.300
can't say yeah but a lot of developers wanting to build

01:17:44.300 --> 01:17:46.239
here so let's just go do that in stark

01:17:46.239 --> 01:17:48.649
contrast to what intelligent thoughtful people have put

01:17:48.649 --> 01:17:50.319
forth to begin with. So I think there

01:17:50.319 --> 01:17:53.949
is an ongoing conversation and it could be living but I

01:17:53.949 --> 01:17:57.520
think we're charged here to more often than

01:17:57.520 --> 01:18:02.029
not force what the city has has put forth as their plan.

01:18:02.029 --> 01:18:05.520
And I agree but the thing is that decision

01:18:05.520 --> 01:18:08.689
was made five, ten years ago. Things have changed and we

01:18:08.689 --> 01:18:10.880
have to be realized that things change

01:18:11.439 --> 01:18:13.890
and, and that's why I think it's a living document. You

01:18:13.890 --> 01:18:16.000
have to be looking at it constantly

01:18:16.000 --> 01:18:19.079
because decisions that were made just like they made fight

01:18:19.079 --> 01:18:20.880
made that decision that all the growth

01:18:20.880 --> 01:18:23.220
is going to be on the south side and all of a sudden you

01:18:23.220 --> 01:18:24.319
have it on the north side.

01:18:25.119 --> 01:18:28.949
People had no clue what was going on so I mean they had a

01:18:28.949 --> 01:18:31.439
clue but it wasn't it wasn't what they

01:18:31.439 --> 01:18:34.449
thought it was going to happen. So now you have to readjust

01:18:34.449 --> 01:18:36.479
and say this is what's happening out there

01:18:36.479 --> 01:18:39.560
it's growing outside there's a lot of growth outside the

01:18:39.560 --> 01:18:41.680
loop something that wasn't probably

01:18:45.199 --> 01:18:47.979
thought of and now we have to readjust and that's what

01:18:47.979 --> 01:18:51.279
happens is as a city grows yes we you have

01:18:51.279 --> 01:18:54.170
certain things going on but at the same it's but at the

01:18:54.170 --> 01:18:56.079
same you have to adjust and I think

01:18:56.079 --> 01:18:59.359
I think you can't be I guess and the reason I say I'm in

01:18:59.359 --> 01:19:02.159
the middle of building some apartments

01:19:02.159 --> 01:19:04.920
and I've had to make some changes hey these were my plans

01:19:04.920 --> 01:19:07.119
when I started but then all of a sudden

01:19:07.119 --> 01:19:09.539
we get here and we say okay I got to make these adjustments

01:19:09.539 --> 01:19:11.199
these adjustments these adjustments

01:19:11.840 --> 01:19:14.899
or it's not going to work and I think one tool that the

01:19:14.899 --> 01:19:18.479
city has used we don't use it often but

01:19:18.479 --> 01:19:22.880
it is but it can be helpful is is things like small area

01:19:22.880 --> 01:19:25.279
plans as as an appendix to the

01:19:25.279 --> 01:19:29.100
comprehensive plans to allow you to look more deeply at

01:19:29.100 --> 01:19:32.720
specific areas to determine determine

01:19:32.720 --> 01:19:36.829
you know what the vision you know a smaller vision for a

01:19:36.829 --> 01:19:39.359
very localized area to take in the

01:19:39.359 --> 01:19:44.159
benchmarking and and and and and the the surrounding

01:19:44.159 --> 01:19:47.439
property owners and and and the community leaders

01:19:47.439 --> 01:19:50.449
and how that's going to move in that direction so I think I

01:19:50.449 --> 01:19:52.399
think we could use all of these tools

01:19:52.399 --> 01:19:55.579
to help us make really good decisions within the city I'm

01:19:55.579 --> 01:19:57.920
just going to point out also that our

01:19:57.920 --> 01:20:02.319
code already has a procedure for making amendments to the

01:20:02.319 --> 01:20:04.640
comprehensive plan if needed

01:20:05.600 --> 01:20:09.420
it kind of contains an internal governor to keep it from

01:20:09.420 --> 01:20:13.920
being abused I contemplates that that

01:20:14.479 --> 01:20:17.479
you know like say if a property owner initiates a plan

01:20:17.479 --> 01:20:20.239
amendment that it would be submitted 90

01:20:20.239 --> 01:20:23.869
days prior to the first meeting of pnz in January April

01:20:23.869 --> 01:20:28.880
July or October and so I think kind of the

01:20:28.880 --> 01:20:31.789
intent of that is to keep it from being an ad hoc gee this

01:20:31.789 --> 01:20:34.239
is inconsistent with the future land use

01:20:34.239 --> 01:20:37.250
map let's let's quick amend it and run that simultaneously

01:20:37.250 --> 01:20:38.479
with a zoning amendment

01:20:39.359 --> 01:20:42.550
I I think that the intent here is to try to give some

01:20:42.550 --> 01:20:45.920
legitimacy because I think uh Commissioner

01:20:45.920 --> 01:20:49.140
Sanchez is absolutely right you know if if five years is an

01:20:49.140 --> 01:20:51.279
average if you're a fast growing city

01:20:51.279 --> 01:20:54.470
it might be more often than five years if you're a slow

01:20:54.470 --> 01:20:56.960
growing landlocked city then it may be

01:20:58.000 --> 01:21:03.430
that that could drag out even further but uh you know as an

01:21:03.430 --> 01:21:06.079
interim measure there is an

01:21:06.079 --> 01:21:09.380
there is an option to do that and we have done that before

01:21:09.380 --> 01:21:12.319
where necessary and I know that

01:21:12.319 --> 01:21:16.239
somebody mentioned uh master plan communities before I know

01:21:16.239 --> 01:21:18.000
that at least in a previous

01:21:18.000 --> 01:21:21.069
comprehensive plan we inserted a provision in there that

01:21:21.069 --> 01:21:23.760
said that because a master plan really

01:21:23.760 --> 01:21:28.029
is master planned it's like a mini comprehensive plan in

01:21:28.029 --> 01:21:32.319
and of itself and in in providing a variety

01:21:32.319 --> 01:21:37.489
of different uses that uh that that we will allow for that

01:21:37.489 --> 01:21:40.960
as as as part of our comprehensive plan

01:21:42.000 --> 01:21:45.819
uh great points jerry per now you've been waiting kusher um

01:21:45.819 --> 01:21:48.560
yeah so uh kind of uh along the lines of

01:21:49.279 --> 01:21:51.779
kind of combining both of what you guys said you know the

01:21:51.779 --> 01:21:53.600
point was raised at the uh you know

01:21:53.600 --> 01:21:56.689
the last plan saw greater you know uh growth out heading

01:21:56.689 --> 01:21:58.720
towards ropes and ranch and why didn't

01:21:58.720 --> 01:22:02.079
that happen and the first thing in my mind was uh because

01:22:02.079 --> 01:22:04.720
of 35 and the way it um basically clogs

01:22:04.720 --> 01:22:07.729
if you ever want to go to Dallas from there I wouldn't want

01:22:07.729 --> 01:22:09.199
to live that far out um I I know

01:22:09.199 --> 01:22:12.100
that we have some expansion on 35 uh you know which may

01:22:12.100 --> 01:22:14.079
provide a little bit of relief before

01:22:14.079 --> 01:22:17.579
bucky's gets here um but when it comes to the growth that

01:22:17.579 --> 01:22:20.560
we're going to see 200 000 people and

01:22:20.560 --> 01:22:24.800
everything and and I still see just 35 35 and everything um

01:22:24.800 --> 01:22:27.600
how much of this plan uh accommodates

01:22:27.600 --> 01:22:31.029
for you know high flow arteries to kind of help people get

01:22:31.029 --> 01:22:33.119
in and out and and make dent in a place

01:22:33.119 --> 01:22:37.520
that you know people don't get stuck in well in a mobility

01:22:37.520 --> 01:22:41.119
element it talks about um multimodal

01:22:41.119 --> 01:22:43.729
transportation so probably not going to out you're never

01:22:43.729 --> 01:22:45.520
going to build enough roads to not have

01:22:45.520 --> 01:22:48.340
traffic jams so what you have to do is ensure that there's

01:22:48.340 --> 01:22:50.479
multimodal and that and that there's a

01:22:50.479 --> 01:22:55.319
mix of uses and so you look at land use um in addition to

01:22:55.319 --> 01:22:58.479
roads land use can drive um can drive

01:22:58.479 --> 01:23:01.489
trips vehicle trips so you so part of the plan and part of

01:23:01.489 --> 01:23:03.680
our comprehensive development code is

01:23:03.680 --> 01:23:06.960
looking at a mix of uses and and um and the community said

01:23:06.960 --> 01:23:08.960
they wanted to live near jobs and

01:23:08.960 --> 01:23:13.760
have have um have more compact growth so but yes the growth

01:23:13.760 --> 01:23:16.560
is coming and then what road where are

01:23:16.560 --> 01:23:18.670
those roads and where are they where are they going to go

01:23:18.670 --> 01:23:20.479
and how are they going to move people around

01:23:21.199 --> 01:23:25.279
our comprehensive plan doesn't is not a full thoroughfare

01:23:25.279 --> 01:23:27.600
plan um I know our engineering

01:23:27.600 --> 01:23:30.159
department and I think we're going to have them come talk

01:23:30.159 --> 01:23:32.319
to you guys soon about the planning

01:23:32.319 --> 01:23:35.479
they're doing and in fact um they're and Richard may want

01:23:35.479 --> 01:23:37.520
to chime in here they're actually looking

01:23:37.520 --> 01:23:40.850
at some studies for very specific areas within the city

01:23:40.850 --> 01:23:43.760
particularly on the northeast and then also

01:23:43.760 --> 01:23:46.939
in I believe the Ryan road area because of so many

01:23:46.939 --> 01:23:49.840
developments coming in how are they going to move

01:23:49.840 --> 01:23:53.470
people through so they're they're they're trying to get

01:23:53.470 --> 01:23:55.600
ahead of that um it's it's not really

01:23:55.600 --> 01:23:59.909
addressed fully in this but with those smaller plans and

01:23:59.909 --> 01:24:03.359
the more local plans hopefully um we

01:24:03.359 --> 01:24:07.810
can address some of those mobility issues. Commissioner

01:24:07.810 --> 01:24:10.239
Smith. Thank you chair and to

01:24:10.239 --> 01:24:13.250
you know to commissioner Sanchez's point plans change you

01:24:13.250 --> 01:24:16.079
know you don't uh I'm I'm in the

01:24:16.079 --> 01:24:18.590
business world so you know any any business which should

01:24:18.590 --> 01:24:20.640
have a five-year vision a five-year plan

01:24:20.640 --> 01:24:23.060
put ahead of them if not longer but publicly traded

01:24:23.060 --> 01:24:24.960
companies get bought up in mergers and

01:24:24.960 --> 01:24:27.600
acquisitions all the time no one ever plans for those

01:24:27.600 --> 01:24:29.760
things and so you're right big things happen

01:24:29.760 --> 01:24:32.100
we can't predict that two years from now there might be

01:24:32.100 --> 01:24:33.760
another economic recession and if that

01:24:33.760 --> 01:24:36.890
happens our 2030 plan can be easily thrown out the window

01:24:36.890 --> 01:24:39.119
because every developer who went through and

01:24:39.119 --> 01:24:42.170
rezoned for those 14,000 units could say well I just went

01:24:42.170 --> 01:24:43.840
bankrupt or I'm not building right now

01:24:43.840 --> 01:24:46.909
because it doesn't economically make sense for me so you're

01:24:46.909 --> 01:24:49.119
right the plan has to be nimble it has

01:24:49.119 --> 01:24:51.829
to be living because it has to pivot but at the same time

01:24:51.829 --> 01:24:53.600
there are a lot of big projects in the

01:24:53.600 --> 01:24:55.770
city they get started and I'm not talking just to you

01:24:55.770 --> 01:24:58.800
commissioner Sanchez but the the the city

01:24:58.800 --> 01:25:01.239
seems like from what we've seen in planning and zoning is

01:25:01.239 --> 01:25:02.880
that the city comes in and says you know

01:25:02.880 --> 01:25:06.810
we're we're basing a lot of our 20 you know our our ideas

01:25:06.810 --> 01:25:09.520
for uh development of infrastructure

01:25:09.520 --> 01:25:12.810
development of utilities where we're diverting our tax our

01:25:12.810 --> 01:25:14.720
taxpayers money to be able to grow

01:25:14.720 --> 01:25:18.020
is based off the 2030 plan and so it's it's scary because

01:25:18.020 --> 01:25:20.640
there's these big long-term projects that

01:25:20.640 --> 01:25:25.439
are dependent upon this document that should be living but

01:25:25.439 --> 01:25:28.000
this is based off a static one point

01:25:28.000 --> 01:25:32.039
in time idea plan and so it's like if we don't if we almost

01:25:32.039 --> 01:25:34.640
don't allow for both the long-term

01:25:34.640 --> 01:25:37.750
projects and the plan itself to both be nimble enough to be

01:25:37.750 --> 01:25:39.520
moved we could get to the end where

01:25:39.520 --> 01:25:42.119
it's like well we were able to move around as a commission

01:25:42.119 --> 01:25:43.840
we were able to move around as a city

01:25:43.840 --> 01:25:46.939
council but the long-term plans and the funding and the

01:25:46.939 --> 01:25:49.359
money where that was all directed whenever

01:25:49.359 --> 01:25:52.989
was and and it could be a little bit scary of a deal but I

01:25:52.989 --> 01:25:56.079
just really wish you could push and

01:25:56.079 --> 01:26:00.109
encourage you know after the after the ddc update gets done

01:26:00.109 --> 01:26:02.479
that seeing a comprehensive plan in the

01:26:02.479 --> 01:26:05.260
future that has some sort of benchmarking provision in

01:26:05.260 --> 01:26:07.439
there I know jerry just mentioned that we can

01:26:07.439 --> 01:26:10.779
make edits to it within the code but some sort of you know

01:26:10.779 --> 01:26:12.880
some macro data some things like

01:26:12.880 --> 01:26:16.060
population growth dwelling growth city size some of these

01:26:16.060 --> 01:26:18.079
things that we can have as macro data

01:26:18.079 --> 01:26:20.989
and having two-year benchmarking that that not necessarily

01:26:20.989 --> 01:26:22.960
we're updating the comprehensive plan

01:26:22.960 --> 01:26:26.550
but planning and zoning and all the important commissions

01:26:26.550 --> 01:26:28.399
are being updated to say we're out

01:26:28.399 --> 01:26:31.060
pacing in these areas we're under pacing in these areas and

01:26:31.060 --> 01:26:32.960
so just because we don't want to get 10

01:26:32.960 --> 01:26:35.300
years down the road and be looking at so we never did

01:26:35.300 --> 01:26:37.600
development in that area why well the 2030

01:26:37.600 --> 01:26:40.000
plan said that we were going to be developing in the

01:26:40.000 --> 01:26:42.239
southwest but really you're the planning and

01:26:42.239 --> 01:26:45.500
zoning you guys developed it all in the northeast because

01:26:45.500 --> 01:26:47.840
plans came forward people had money and

01:26:47.840 --> 01:26:50.840
it's been it you know we we sort of deviated away from the

01:26:50.840 --> 01:26:53.439
future land use map it's like well I

01:26:53.439 --> 01:26:56.810
wish we would have known who wouldn't have done that so one

01:26:56.810 --> 01:27:00.159
thing I just wanted to add sort of the

01:27:00.159 --> 01:27:03.800
kind of a a preview what I've had Karen start to do is

01:27:03.800 --> 01:27:06.560
start to try to assemble these numbers of

01:27:06.560 --> 01:27:10.199
what exactly what are we doing and how do we look at this

01:27:10.199 --> 01:27:12.399
comprehensively and so what we've talked

01:27:12.399 --> 01:27:15.500
about is is putting out what I was calling it dentin by the

01:27:15.500 --> 01:27:17.439
numbers so almost exactly what what

01:27:17.439 --> 01:27:20.590
you're what you're speaking about is how many how many re

01:27:20.590 --> 01:27:22.800
zonings have have we've approved during

01:27:22.800 --> 01:27:25.510
this period of time of the projects that were approved what

01:27:25.510 --> 01:27:27.840
's been built sort of what's what's

01:27:27.840 --> 01:27:30.569
kind of the state of the city in in in that regard and so

01:27:30.569 --> 01:27:32.880
maybe that's something that then we can

01:27:32.880 --> 01:27:36.520
just bring here also quarterly discuss but then put in as

01:27:36.520 --> 01:27:38.640
part of a work program is you know maybe

01:27:38.640 --> 01:27:41.000
it's just an annual you know maybe we start off at annual

01:27:41.000 --> 01:27:42.800
or even six months of hey let's take a look

01:27:42.800 --> 01:27:45.229
at here's the trends that we've seen and at least the

01:27:45.229 --> 01:27:47.119
projects that where things are moving

01:27:47.439 --> 01:27:49.529
let's take a look let's do our annual review of the comp

01:27:49.529 --> 01:27:51.119
plan and what and what what makes sense

01:27:51.119 --> 01:27:54.439
at least from from a future future land use map perspective

01:27:54.439 --> 01:27:56.640
yeah no no no marathon runner ever runs

01:27:56.640 --> 01:28:00.670
the race and doesn't know what their average mile time is

01:28:00.670 --> 01:28:03.039
that makes sense you know if we're

01:28:03.039 --> 01:28:05.659
saying i want to run i want 26 mile marathon i want to do

01:28:05.659 --> 01:28:07.119
it in two and a half hours which i don't

01:28:07.119 --> 01:28:11.279
think i'd make it 2.6 miles in 26 in two hours but whatever

01:28:11.279 --> 01:28:13.920
so you want to run this 26 mile race but

01:28:13.920 --> 01:28:16.800
you know what every single mile your time should be that's

01:28:16.800 --> 01:28:18.800
really important benchmarking and so

01:28:18.800 --> 01:28:21.439
even coming back saying didn't buy the numbers based off

01:28:21.439 --> 01:28:23.680
the 2030 plan we should be trending

01:28:23.680 --> 01:28:27.149
in these ways this year our trend was above or below or out

01:28:27.149 --> 01:28:29.760
of whack in these areas just so we

01:28:29.760 --> 01:28:32.300
get a pulse because otherwise we're just taking on a case-

01:28:32.300 --> 01:28:34.079
by-case basis and that's that can be

01:28:34.960 --> 01:28:37.569
it gives it lets us be nimble but also could be really

01:28:37.569 --> 01:28:41.520
dangerous so commissioner cole yeah some

01:28:41.520 --> 01:28:46.119
of this you know like 2006 southwest didn't was supposed to

01:28:46.119 --> 01:28:48.479
be developed but guess what happened

01:28:48.479 --> 01:28:52.300
the recession so all these moving parts that's why i like

01:28:52.300 --> 01:28:54.880
the living breathing part of this is

01:28:54.880 --> 01:28:58.229
because you don't know when the next one's going to be you

01:28:58.229 --> 01:29:00.640
know so what restricts west of 35

01:29:00.640 --> 01:29:03.819
development where it all happened northeast well there's no

01:29:03.819 --> 01:29:05.920
services infrastructure west of 35

01:29:05.920 --> 01:29:10.149
there's no sewer robson ranch has their own sewer system

01:29:10.149 --> 01:29:12.720
you know there's there's no sewer

01:29:12.720 --> 01:29:15.729
so there's not going to be any growth so where did it all

01:29:15.729 --> 01:29:17.439
have to go i had to go northeast

01:29:18.159 --> 01:29:22.739
because also all the developers out southwest got locked

01:29:22.739 --> 01:29:25.439
out in the recession i guess except

01:29:25.439 --> 01:29:29.689
he would you know but i'm sure you know we don't know when

01:29:29.689 --> 01:29:32.479
they're going to be ready to go but i'm

01:29:32.479 --> 01:29:38.270
sure that's that's not far i'm sure hunter ranch you know

01:29:38.270 --> 01:29:43.039
first phase is not that far away but what

01:29:43.039 --> 01:29:46.670
happens in two years if the we have another recession you

01:29:46.670 --> 01:29:49.680
know i mean that's because if 2006

01:29:49.680 --> 01:29:54.689
seven eight hadn't happened southwest didn't probably be

01:29:54.689 --> 01:29:58.479
right now developed somewhat you know

01:29:58.479 --> 01:30:02.300
but there's all these unforeseen circumstances that happen

01:30:02.300 --> 01:30:04.319
and conditions you know like i said

01:30:04.319 --> 01:30:07.630
there's you know there's just the infrastructure doesn't

01:30:07.630 --> 01:30:10.880
exist out there so but it does up to the

01:30:10.880 --> 01:30:15.680
east but you know i do like revisiting it ever so often

01:30:15.680 --> 01:30:19.119
because you don't know what's coming around

01:30:19.119 --> 01:30:22.149
the corner you know because two years can be another

01:30:22.149 --> 01:30:24.960
recession we don't know that you know

01:30:24.960 --> 01:30:28.880
and that's going to scramble everything

01:30:30.560 --> 01:30:33.140
julie i don't know if your presentation was done but we

01:30:33.140 --> 01:30:36.000
went you were good awesome i have one more

01:30:37.039 --> 01:30:40.680
all right i don't have any cool further reading or blogs or

01:30:40.680 --> 01:30:43.279
podcasts for you but my homework is

01:30:43.279 --> 01:30:46.359
to read your debt and plan 2030 um you'll have some great

01:30:46.359 --> 01:30:48.239
questions particular questions about

01:30:48.239 --> 01:30:51.880
mobility and affordable housing if you'll have any other

01:30:51.880 --> 01:30:54.159
questions um boot camp topics that you

01:30:54.159 --> 01:30:57.979
want to go over in detail let us know and i'll i'm just i'm

01:30:57.979 --> 01:31:00.640
just throwing them in there so um feel

01:31:00.640 --> 01:31:02.520
free and then i could come back with a more robust

01:31:02.520 --> 01:31:04.239
presentation regarding those questions

01:31:05.600 --> 01:31:09.420
julie thank you so much presentation was awesome and thanks

01:31:09.420 --> 01:31:11.760
for city staff getting us in time to

01:31:11.760 --> 01:31:14.250
let us talk and breathe and not feel rushed so uh i

01:31:14.250 --> 01:31:16.720
appreciate everyone being here early and

01:31:16.720 --> 01:31:20.970
letting us do that tonight uh the last thing we have is the

01:31:20.970 --> 01:31:23.279
october 24th uh planning zoning

01:31:23.279 --> 01:31:25.989
commission is going to be a full schedule it looks like

01:31:25.989 --> 01:31:28.000
with uh potentially a lot on the agenda

01:31:28.560 --> 01:31:32.189
and for those who don't know the planning zoning commission

01:31:32.189 --> 01:31:34.399
uh members also serve on the capital

01:31:34.399 --> 01:31:38.220
improvements advisory committee that meets twice a year and

01:31:38.220 --> 01:31:40.159
we need to have a meeting so we need

01:31:40.159 --> 01:31:43.270
to talk about start time for the work session because we

01:31:43.270 --> 01:31:45.439
also have ps wanting to give a traffic

01:31:45.439 --> 01:31:49.479
transportation update so richard right now correctly wrong

01:31:49.479 --> 01:31:52.319
we're going to try to start at 4 30 but we're

01:31:52.319 --> 01:31:56.140
needing to see if four clocks possible for the ciac meeting

01:31:56.140 --> 01:31:58.800
correct and then also we have we have

01:31:58.800 --> 01:32:03.770
i think right now um 11 applications uh that would be under

01:32:03.770 --> 01:32:07.359
review um some of those are on on consent

01:32:07.359 --> 01:32:10.189
um but there is there is some there are some heavy lifting

01:32:10.189 --> 01:32:12.319
items uh with respect to some uh some of

01:32:12.319 --> 01:32:15.949
the rezoning's that are that are coming forward and sups on

01:32:15.949 --> 01:32:20.319
that on that agenda and so could start at

01:32:20.319 --> 01:32:23.489
three um but given that we we have to have that capital

01:32:23.489 --> 01:32:26.239
improvements advisory committee meeting

01:32:26.239 --> 01:32:29.869
does it make sense to move the discussion on traffic to the

01:32:29.869 --> 01:32:31.520
note to the first meeting in

01:32:31.520 --> 01:32:34.079
november so that that gives a little bit more time

01:32:37.680 --> 01:32:39.090
because i know we've been talking about it and i've i just

01:32:39.090 --> 01:32:41.520
didn't want to not have it on there and

01:32:41.520 --> 01:32:44.079
then you guys you know i just wanted to bring it bring it

01:32:44.079 --> 01:32:47.760
to everyone's attention yeah kishorel's

01:32:47.760 --> 01:32:50.840
thank you chair yeah i i'd be for moving it because we've

01:32:50.840 --> 01:32:52.880
waited a long time for that discussion

01:32:53.520 --> 01:32:56.560
it's going to end up being seven minutes long if that with

01:32:56.560 --> 01:32:58.560
an agenda like like what we have ahead

01:32:58.560 --> 01:33:01.630
of us so i think to be a worthy true work session

01:33:01.630 --> 01:33:05.600
discussion i think we need to move it so for for

01:33:05.600 --> 01:33:08.890
just helping get this done by a show of hands can everyone

01:33:08.890 --> 01:33:11.039
raise their hand if they're okay with

01:33:11.039 --> 01:33:15.079
pushing the transportation meeting from 1024 on the nove

01:33:15.079 --> 01:33:17.279
mber schedule is everyone okay with that

01:33:18.560 --> 01:33:22.189
pushing transportation update that was on the 24th to the

01:33:22.189 --> 01:33:24.800
first meeting in november if you're

01:33:24.800 --> 01:33:27.890
okay with that if you could raise your hand if not in nove

01:33:27.890 --> 01:33:29.760
mber first meeting in november

01:33:32.239 --> 01:33:35.880
14th i'm good with 14 so are we okay so we'll push

01:33:35.880 --> 01:33:40.720
transportation to the next meeting and then

01:33:40.720 --> 01:33:44.539
with the ciac is it possible for p and z to start our

01:33:44.539 --> 01:33:47.600
meeting at four o'clock on the 24th

01:33:50.479 --> 01:33:54.300
so i'm getting nods four o'clock is doable fine with me

01:33:54.300 --> 01:33:56.640
would buy me too so if we can do it for

01:33:56.640 --> 01:34:02.000
perfect uh does that work on that item yep perfect uh so

01:34:02.000 --> 01:34:02.880
with that we will close the

01:34:02.880 --> 01:34:17.920
work session at 6 14 we'll meet in council chambers at 6 30

01:34:22.319 --> 01:34:23.689
good evening and welcome to the planning zoning commission

01:34:23.689 --> 01:34:28.000
for october 10th 2018 we will start

01:34:28.000 --> 01:34:31.630
the meeting at 6 36 first order of business is to stand and

01:34:31.630 --> 01:34:33.760
give a pledge of allegiance to the u.s.

01:34:33.760 --> 01:34:36.399
and texas flag

01:34:44.720 --> 01:34:50.399
one nation

01:34:55.520 --> 01:34:59.840
texas one state

01:35:06.800 --> 01:35:07.720
the next item on the agenda will be consider approval of

01:35:07.720 --> 01:35:10.560
the planning and zoning minutes i

01:35:10.560 --> 01:35:13.819
open the floor to discussion or motion commissioner prun

01:35:13.819 --> 01:35:14.159
etta

01:35:16.960 --> 01:35:20.079
i'd like to request an adjustment to the meeting minutes on

01:35:20.079 --> 01:35:23.119
uh page six with regard to item five b

01:35:23.920 --> 01:35:27.199
my vote was actually an i and it's listed as a recused

01:35:31.359 --> 01:35:34.550
thank you for the notation is there any discussion or

01:35:34.550 --> 01:35:35.520
motion

01:35:38.880 --> 01:35:41.449
commissioner smith motion approved with uh commissioner pr

01:35:41.449 --> 01:35:44.319
unettas uh edits thank you

01:35:44.319 --> 01:35:47.329
commissioner beck second we have a first and a second any

01:35:47.329 --> 01:35:50.640
other discussion we'll call for a

01:35:50.640 --> 01:35:55.039
vote on the board

01:36:02.159 --> 01:36:04.350
motion passes seven zero that'll move us directly into our

01:36:04.350 --> 01:36:08.000
public hearings as a point of order

01:36:08.800 --> 01:36:16.560
item 3a s 18-008 b has been postponed the staff is working

01:36:16.560 --> 01:36:18.000
through some issues that have come up

01:36:18.000 --> 01:36:22.039
and so that will be reposted and brought before the p and z

01:36:22.039 --> 01:36:23.600
at a date in the future

01:36:24.880 --> 01:36:32.159
continuing on we'll move to item 3b item is z 18-0014

01:36:33.119 --> 01:36:35.250
we can call upon julie for presentation i'll open the

01:36:35.250 --> 01:36:36.239
public hearing

01:36:42.000 --> 01:36:43.079
good evening i'm julie wyatt senior planner with the city

01:36:43.079 --> 01:36:46.800
of denton and i'm presenting z 18-14

01:36:46.800 --> 01:36:50.619
commercial rezoning the request before you is to hold a

01:36:50.619 --> 01:36:52.479
public hearing and consider a

01:36:52.479 --> 01:36:57.449
recommendation regarding a rezoning from pd 115 district to

01:36:57.449 --> 01:36:59.600
rcc district on approximately nine

01:36:59.600 --> 01:37:02.689
acres the subject property is located on the north side of

01:37:02.689 --> 01:37:06.000
the city in the general area of

01:37:06.000 --> 01:37:15.210
loop 288 highway 77 and bonnie bray more specifically the

01:37:15.210 --> 01:37:17.439
request is to um well more

01:37:17.439 --> 01:37:20.760
specifically regarding the pd i guess i should say is is

01:37:20.760 --> 01:37:23.199
that it was uh the detail plan for the pd

01:37:23.199 --> 01:37:27.489
was approved in 2004 and that included a 10 000 square foot

01:37:27.489 --> 01:37:29.680
church along with the accessory school

01:37:29.680 --> 01:37:33.260
or daycare uses the applicant that it was never developed

01:37:33.260 --> 01:37:35.600
so the applicant would like to rezone

01:37:35.600 --> 01:37:39.229
the property in order to develop the site with a uh a mixed

01:37:39.229 --> 01:37:41.600
use development a question came up at

01:37:41.600 --> 01:37:45.850
work session is you know how did this small area of pd how

01:37:45.850 --> 01:37:48.479
is it still here i did a little a little

01:37:48.479 --> 01:37:52.300
looking around and this actually is is a part of the pd to

01:37:52.300 --> 01:37:54.720
the south so it was the northern most

01:37:54.720 --> 01:37:59.140
part of tracked of this pd and pd 115 then goes further to

01:37:59.140 --> 01:38:04.239
the south so as you can see here if if

01:38:04.239 --> 01:38:07.250
the rezoning was it would was approved then the map would

01:38:07.250 --> 01:38:08.880
be modified to look like this

01:38:10.000 --> 01:38:11.949
so our criteria for approval are in sub chapter three of

01:38:11.949 --> 01:38:14.000
the denton development code first does

01:38:14.000 --> 01:38:17.640
it comply with the future land use plan and then is their

01:38:17.640 --> 01:38:19.920
adequate provision of water sewer

01:38:19.920 --> 01:38:23.770
transportation and other public infrastructure so first we

01:38:23.770 --> 01:38:26.399
'll look at the denton plan 2030

01:38:26.399 --> 01:38:30.220
the subject property is located in the business innovation

01:38:30.220 --> 01:38:32.560
designation of the future land use map

01:38:32.560 --> 01:38:36.189
the intent is to provide for large employment centers and

01:38:36.189 --> 01:38:38.640
also supporting uses such as retail

01:38:38.640 --> 01:38:41.880
restaurant hotel and then higher density residential the

01:38:41.880 --> 01:38:45.600
the future land use is is intended to provide

01:38:45.600 --> 01:38:49.229
broad policy goals so that several zoning districts could

01:38:49.229 --> 01:38:52.960
fit within those and meet those goals rcc

01:38:52.960 --> 01:38:56.250
district in this instance and this location does beat it

01:38:56.250 --> 01:38:58.880
particularly because it's close to areas

01:38:58.880 --> 01:39:01.500
that will eventually develop with more lower density

01:39:01.500 --> 01:39:03.439
residential here to the south there's

01:39:03.439 --> 01:39:07.069
also some institutional uses around so it makes sense to

01:39:07.069 --> 01:39:09.279
have those supporting uses like

01:39:09.279 --> 01:39:12.159
retail and commercial uses less of those industrial type

01:39:12.159 --> 01:39:14.239
uses that you might typically see

01:39:14.239 --> 01:39:16.880
in a business innovation zone uh future land use

01:39:16.880 --> 01:39:20.079
designation so rccd does meet the intent of it

01:39:20.720 --> 01:39:23.750
also in addition that the access to the site the loop 288

01:39:23.750 --> 01:39:25.359
as well as highway 77

01:39:25.359 --> 01:39:28.310
provides the access and visibility necessary for retail

01:39:28.310 --> 01:39:31.920
development the concept plan in front of

01:39:31.920 --> 01:39:34.789
you was provided by the applicant as part of a trip

01:39:34.789 --> 01:39:38.399
generation analysis the the request tonight

01:39:38.399 --> 01:39:41.529
is not an approval of this concept plan to really approve

01:39:41.529 --> 01:39:43.760
or a recommendation for approval of the

01:39:43.760 --> 01:39:46.949
zoning district and the uses and development scale

01:39:46.949 --> 01:39:49.840
associated with it this concept plan really is

01:39:49.840 --> 01:39:54.069
a more of a discussion item to talk about trip generation

01:39:54.069 --> 01:39:57.039
so the subject property they looked

01:39:57.039 --> 01:40:00.670
at that as well as the adjacent property so an entire 32

01:40:00.670 --> 01:40:02.800
acre that entire corner there at loop

01:40:02.800 --> 01:40:07.479
288 and highway 77 and they developed some land use

01:40:07.479 --> 01:40:10.880
assumptions in which to base the trips on

01:40:10.880 --> 01:40:13.890
and that would include that included 400 multi-family dwell

01:40:13.890 --> 01:40:15.359
ings as well as 122 000

01:40:15.359 --> 01:40:19.380
square feet of retail the it trip generation manual

01:40:19.380 --> 01:40:22.319
indicated that that would generate about

01:40:22.319 --> 01:40:27.770
9800 trips 391 being in the am peak and then 833 in the

01:40:27.770 --> 01:40:30.399
evening peak which is a lot of trips

01:40:31.119 --> 01:40:35.039
in addition to future development in the area there's

01:40:35.039 --> 01:40:38.319
significant proposed and also in

01:40:38.319 --> 01:40:41.409
construction development in this general area just to look

01:40:41.409 --> 01:40:43.600
at those briefly first of all you may be

01:40:43.600 --> 01:40:46.699
aware that the the new dent in high school is proposed to

01:40:46.699 --> 01:40:48.640
be located in this general area

01:40:49.279 --> 01:40:52.920
you've got the unt discovery park here that's that's

01:40:52.920 --> 01:40:56.000
operational townhome development we've

01:40:56.000 --> 01:40:59.630
got multi-family development and a regional park there's

01:40:59.630 --> 01:41:01.439
also a single-family residential

01:41:01.439 --> 01:41:04.449
development that is is anticipated to come before you soon

01:41:04.449 --> 01:41:05.680
so there's a lot going on

01:41:06.239 --> 01:41:09.079
and and a lot of trips being generated by all of these uses

01:41:09.079 --> 01:41:11.600
and so our engineering department

01:41:11.600 --> 01:41:13.939
looked at that and felt like we we needed to get ahead of

01:41:13.939 --> 01:41:15.840
some of the mobility issues in this area

01:41:16.399 --> 01:41:19.420
and because of that they've they've determined they're

01:41:19.420 --> 01:41:22.079
going to extend some bonnie bray

01:41:22.079 --> 01:41:25.979
improvements north of university to this area and that

01:41:25.979 --> 01:41:28.399
would include capacity and safety

01:41:28.399 --> 01:41:32.439
improvements stormwater and utility relocations the intent

01:41:32.439 --> 01:41:34.479
is to to provide a four-lane divided

01:41:34.479 --> 01:41:38.109
arterial in this location and the it's currently under

01:41:38.109 --> 01:41:40.720
design the final alignment has not been

01:41:40.720 --> 01:41:45.609
determined but it is it is being studied and we'll know it

01:41:45.609 --> 01:41:48.640
in the beginning part of next year

01:41:48.640 --> 01:41:52.869
so it's either going to track to the west here shown here

01:41:52.869 --> 01:41:55.520
or it would track to the east so we

01:41:55.520 --> 01:41:57.739
just we just don't know what's going to be target

01:41:57.739 --> 01:42:00.000
construction is to begin in late 2019

01:42:00.640 --> 01:42:03.289
and it's supposed to be completed in time for the high

01:42:03.289 --> 01:42:04.239
school to open

01:42:05.920 --> 01:42:09.550
sorry in addition to mobility and the future land use we

01:42:09.550 --> 01:42:11.279
also looked at the compatibility

01:42:11.279 --> 01:42:14.479
of the zoning request there's not a lot of development out

01:42:14.479 --> 01:42:15.920
here yet but there there is

01:42:15.920 --> 01:42:19.550
zoning that affects it and in particular the rccd there's

01:42:19.550 --> 01:42:22.479
quite a bit of it along north loop 288 so

01:42:23.199 --> 01:42:25.739
if this zoning is approved it would be a logical extension

01:42:25.739 --> 01:42:27.920
of that existing zoning pattern

01:42:27.920 --> 01:42:31.550
any development that then moves forward in this general

01:42:31.550 --> 01:42:33.760
area and on these corridors would be

01:42:33.760 --> 01:42:37.390
compatible both in use and development scale as they would

01:42:37.390 --> 01:42:38.880
all be in that same governing

01:42:38.880 --> 01:42:41.600
zoning district development must comply with all ddc

01:42:41.600 --> 01:42:43.920
requirements that includes tree preservation

01:42:43.920 --> 01:42:48.060
site design lighting tree canopy and screening water and

01:42:48.060 --> 01:42:50.800
sewer are not currently available so

01:42:51.600 --> 01:42:54.270
so this they'll have to be extended as part of any

01:42:54.270 --> 01:42:58.159
development here a notification was sent out of

01:42:58.159 --> 01:43:01.420
the property we haven't received any responses and based

01:43:01.420 --> 01:43:03.359
upon the criteria for approval and

01:43:03.359 --> 01:43:06.369
staff's analysis we do recommend approval of the request

01:43:06.369 --> 01:43:07.840
the applicant is here if you have

01:43:07.840 --> 01:43:11.659
any questions and i will stand for any questions christ

01:43:11.659 --> 01:43:14.000
opher beck thank you chair thanks julie i

01:43:14.000 --> 01:43:19.149
noticed that uh rccd on residential uses it does allow

01:43:19.149 --> 01:43:23.039
attached single-family dwellings does not

01:43:23.039 --> 01:43:26.159
allow single-family building so attached would be talking

01:43:26.159 --> 01:43:27.920
about like town homes things of that

01:43:27.920 --> 01:43:31.550
nature yes sir okay and it doesn't allow any manufacturing

01:43:31.550 --> 01:43:33.520
housing building but cedar okay the

01:43:33.520 --> 01:43:36.810
only reason i asked because this was a specific area i was

01:43:36.810 --> 01:43:38.960
looking at for tiny homes so that was

01:43:38.960 --> 01:43:42.800
my concern about that anyway thank you i don't see any

01:43:42.800 --> 01:43:46.800
other questions for you julie thank you

01:43:46.800 --> 01:43:49.710
for your presentation this is a public hearing anyone

01:43:49.710 --> 01:43:51.119
wishing to speak may do so

01:43:54.640 --> 01:43:57.279
if you do you just need to come down state your name and

01:43:57.279 --> 01:43:59.039
your address we can fill out a card later

01:44:04.640 --> 01:44:05.850
what i would ask the commission if you have questions for

01:44:05.850 --> 01:44:08.319
the applicant let's do that

01:44:08.319 --> 01:44:10.699
in the public hearing before i close it out so if there's

01:44:10.699 --> 01:44:12.159
anything that needs to be brought up from

01:44:12.159 --> 01:44:14.649
the public questioning that so if you have questions for

01:44:14.649 --> 01:44:16.800
the applicant let's do that before we close

01:44:16.800 --> 01:44:23.119
public hearing and i don't see any so with that i'll go

01:44:23.119 --> 01:44:26.159
ahead and close the public hearing open

01:44:26.159 --> 01:44:30.960
this for discussion or motion commissioner smith motion for

01:44:30.960 --> 01:44:33.359
approval commissioner sanchez

01:44:36.800 --> 01:44:38.560
we have a first and a second any discussion

01:44:40.640 --> 01:44:42.319
seeing none we call for a vote on the board

01:44:46.800 --> 01:44:51.359
okay motion carries seven zero

01:44:54.479 --> 01:44:58.300
that moves us to our last item for the public hearing item

01:44:58.300 --> 01:45:02.000
three c z 18 dash zero zero

01:45:02.000 --> 01:45:05.930
18 a i will open the public hearing and call cindy jackson

01:45:05.930 --> 01:45:09.039
for presentation thank you

01:45:16.960 --> 01:45:23.039
so

01:45:27.279 --> 01:45:30.630
z 18 dash zero zero one eight is a request for approval of

01:45:30.630 --> 01:45:35.600
a rezoning of a 20.7 acre site

01:45:35.600 --> 01:45:35.600
from the nr4 neighborhood residential district to the nrmu

01:45:35.600 --> 01:45:44.000
neighborhood mixed use 12 zoning district

01:45:44.640 --> 01:45:48.270
site is located north of mckinney street which you can see

01:45:48.270 --> 01:45:51.279
along here east of the loop which is here

01:45:51.840 --> 01:45:54.159
and north of duchess which is along here

01:45:56.239 --> 01:45:59.880
current zoning as you can see is nr4 the request the

01:45:59.880 --> 01:46:03.760
proposed zoning nrmu 12 is an extension

01:46:03.760 --> 01:46:07.579
of the existing nrmu 12 that is located to the north of the

01:46:07.579 --> 01:46:07.840
site

01:46:10.399 --> 01:46:14.609
the applicant's proposed concept plan can be seen here the

01:46:14.609 --> 01:46:16.560
applicant is proposing a

01:46:19.039 --> 01:46:22.189
townhouse development that will be developed as a multi-

01:46:22.189 --> 01:46:22.960
family

01:46:24.239 --> 01:46:27.880
development in that the townhouses won't be on their own

01:46:27.880 --> 01:46:30.479
individual lots they'll be on one single

01:46:30.479 --> 01:46:34.439
lot and but however they will be sold a condo style the

01:46:34.439 --> 01:46:37.039
applicant is proposing no more than six

01:46:37.039 --> 01:46:41.579
dwelling units per acre and the development respects the

01:46:41.579 --> 01:46:44.800
topography of the area which is

01:46:45.680 --> 01:46:48.949
very high in the middle of the site and then goes down 28

01:46:48.949 --> 01:46:53.279
feet around the perimeter as well as

01:46:53.279 --> 01:46:56.109
preserving as many trees as possible and i just want to

01:46:56.109 --> 01:46:58.000
note that the minimum preservation

01:46:58.000 --> 01:47:01.819
requirement for the site would be 12.5 percent of the

01:47:01.819 --> 01:47:03.119
existing tree canopy

01:47:06.239 --> 01:47:09.420
the purpose of the nr as i noted earlier the purpose for

01:47:09.420 --> 01:47:12.560
the nrmu 12 is to facilitate this

01:47:12.560 --> 01:47:17.920
development as well as a on one lot instead of them being

01:47:17.920 --> 01:47:21.359
on separate lots even though the

01:47:21.359 --> 01:47:25.460
proposed density is nr6 excuse me is six dwelling units per

01:47:25.460 --> 01:47:28.960
acre the multi-family concept would not

01:47:28.960 --> 01:47:37.039
be permitted in the nr4 nr6 zoning district an xup will be

01:47:37.039 --> 01:47:40.720
required once if the zoning is approved to

01:47:40.720 --> 01:47:45.850
move forward with this development when looking at rezon

01:47:45.850 --> 01:47:50.079
ings we we have some criteria that we need

01:47:50.079 --> 01:47:53.359
to follow per the dent development code the first question

01:47:53.359 --> 01:47:55.600
is does the request conform to the future

01:47:55.600 --> 01:47:58.750
land use plan and would there be adequate provision of

01:47:58.750 --> 01:48:01.840
transportation water sewer schools parks etc

01:48:04.000 --> 01:48:08.159
the the future land use designation of the site is moderate

01:48:08.159 --> 01:48:11.439
residential which promotes single family

01:48:11.439 --> 01:48:14.550
housing on small lots with a density of between four and

01:48:14.550 --> 01:48:17.680
twelve dwelling units per acre the types

01:48:17.680 --> 01:48:21.020
and uses and scale of development permitted in the nrmu 12

01:48:21.020 --> 01:48:23.439
district do conform with the goals of the

01:48:23.439 --> 01:48:27.970
moderate residential designation and with regards to

01:48:27.970 --> 01:48:31.760
density use town homes are encouraged in this

01:48:31.760 --> 01:48:37.039
in this designation and it's also encouraged to be used as

01:48:37.039 --> 01:48:40.720
a buffer between residential

01:48:41.680 --> 01:48:45.600
which this is single family attached duplexes to the south

01:48:45.600 --> 01:48:49.600
and the more intense uses along mckinney

01:48:49.600 --> 01:48:53.770
street specifically a church a multi-proposed multi-family

01:48:53.770 --> 01:48:57.119
development and an electrical transformer

01:48:57.119 --> 01:49:03.880
site i already did that the requested nrmu 12 district is a

01:49:03.880 --> 01:49:07.279
continuation of the nrmu 12 district

01:49:07.279 --> 01:49:11.100
to the north as previously noted the use is permitted in

01:49:11.100 --> 01:49:13.279
the nrmu 12 district would be

01:49:13.279 --> 01:49:16.399
consistent with the uses that exist today which are

01:49:16.399 --> 01:49:19.439
moderate density residential uses the nrmu

01:49:19.439 --> 01:49:23.670
12 district also permits some neighborhood scale commercial

01:49:23.670 --> 01:49:26.239
uses however we're proposing an overlay

01:49:26.239 --> 01:49:32.630
to restrict that those uses the development must comply

01:49:32.630 --> 01:49:38.479
with all esa tree vet preservation buffer

01:49:38.479 --> 01:49:42.119
screening tree canopy and lighting requirements water and

01:49:42.119 --> 01:49:44.159
wastewater are available to the site

01:49:44.159 --> 01:49:48.720
from trailhead lane and then there's also water available

01:49:48.720 --> 01:49:54.560
from lane lane drive and from muckingbird

01:49:57.439 --> 01:50:01.079
we sent out notices within 200 feet of the site via

01:50:01.079 --> 01:50:04.640
certified mail and postcard notices

01:50:04.640 --> 01:50:07.880
courtesy notices within 500 feet of the site we received

01:50:07.880 --> 01:50:11.520
one response back in favor which is just

01:50:11.520 --> 01:50:15.689
this right here this corner right here it's hard to see

01:50:15.689 --> 01:50:19.680
that little corner represents 0.5 percent

01:50:19.680 --> 01:50:23.500
of the land area within the 200 foot buffer three signs

01:50:23.500 --> 01:50:25.359
were also posted on the site and there's

01:50:25.359 --> 01:50:29.180
pictures of them in your backup staff recommends approval

01:50:29.180 --> 01:50:31.680
of this request with a mixed use protection

01:50:31.680 --> 01:50:34.869
overlay including the following conditions the use of the

01:50:34.869 --> 01:50:37.119
site is limited to multi-family townhouse

01:50:37.119 --> 01:50:40.359
to style style development with a maximum permitted density

01:50:40.359 --> 01:50:42.079
of six dwelling units per acre

01:50:42.800 --> 01:50:45.630
and the proposed northern access drive to mckinney street

01:50:45.630 --> 01:50:48.239
shall be utilized as an ems emergency

01:50:48.239 --> 01:50:51.239
medical service access only and that concludes my

01:50:51.239 --> 01:50:54.159
presentation and the applicant is present as well

01:50:55.920 --> 01:50:57.350
thank you cindy for the presentation i don't see any

01:50:57.350 --> 01:50:58.880
questions at this time

01:51:00.960 --> 01:51:02.079
oh commissioner sanchez

01:51:07.119 --> 01:51:12.229
are you okay let's see yeah right there okay you have

01:51:12.229 --> 01:51:15.279
mockingbird which is going to you said that

01:51:15.279 --> 01:51:18.010
earlier we were told that that was going to be extended all

01:51:18.010 --> 01:51:21.520
the way to mckinney mckinney has any

01:51:21.520 --> 01:51:25.159
discussion been talked about that in the future maybe

01:51:25.159 --> 01:51:28.000
having a road coming off mckinney and into

01:51:28.000 --> 01:51:33.039
that development as a second access to to that not yet not

01:51:33.039 --> 01:51:36.159
yet again as i noted previously this

01:51:36.159 --> 01:51:39.319
is a concept plan and we are still we're going to work out

01:51:39.319 --> 01:51:41.279
site details with the applicant when

01:51:41.279 --> 01:51:44.289
he comes forward with the specific use permit application

01:51:44.289 --> 01:51:46.079
and i know it's a concept plan but i

01:51:46.079 --> 01:51:50.109
was just throwing that out that might be a consideration

01:51:50.109 --> 01:51:52.159
because as at our work session

01:51:52.159 --> 01:51:55.800
i did mention that that was only one access that's correct

01:51:55.800 --> 01:51:57.920
right now and and the one that has been

01:51:57.920 --> 01:52:02.319
proposed which is the one uh by the church well that's just

01:52:02.319 --> 01:52:05.279
going to be an emergency so long term

01:52:05.279 --> 01:52:07.869
i'm just saying long term and that area will be developed

01:52:07.869 --> 01:52:09.680
and mockingbird will be developed all

01:52:09.680 --> 01:52:13.710
the way maybe provide that as a look plan a road there that

01:52:13.710 --> 01:52:16.800
will provide access sure the the

01:52:16.800 --> 01:52:19.810
applicant can probably speak to that right now better than

01:52:19.810 --> 01:52:21.279
i can as i said we're still in the

01:52:21.279 --> 01:52:25.970
conceptual stage okay thank you cindy i don't see any other

01:52:25.970 --> 01:52:27.439
questions okay

01:52:29.680 --> 01:52:31.319
this is a public hearing if you're wishing to speak you may

01:52:31.319 --> 01:52:32.960
do so by coming forward

01:52:35.279 --> 01:52:36.960
okay

01:52:43.039 --> 01:52:46.859
commissioner beck i'm hoping that the owner will come

01:52:46.859 --> 01:52:48.800
forward and i do have a few questions for you

01:52:52.239 --> 01:52:54.579
please just state your name and address for the record my

01:52:54.579 --> 01:52:57.840
name is rick barria i live here in

01:52:57.840 --> 01:53:02.310
denton at 51 12 edwards road okay did you have a

01:53:02.310 --> 01:53:06.399
presentation you wanted to give us or yes i do

01:53:06.399 --> 01:53:10.029
uh i didn't uh register i guess out front for it okay why

01:53:10.029 --> 01:53:12.800
don't you go ahead and do that and if

01:53:12.800 --> 01:53:16.649
my questions haven't been answered then i'll okay i'll do

01:53:16.649 --> 01:53:19.119
that uh let's see if i yeah

01:53:20.960 --> 01:53:23.039
i don't want to touch anyone else's presentation

01:53:27.359 --> 01:53:28.560
there you go thank you

01:53:33.039 --> 01:53:34.640
if i can just find that icon

01:53:38.079 --> 01:53:40.560
okay i want to talk about clustering because that's really

01:53:40.560 --> 01:53:44.800
the essence of this uh development i do

01:53:44.800 --> 01:53:49.600
want to mention that um i'm here with uh jack medcalf who

01:53:49.600 --> 01:53:52.720
was our engineer and also uh with

01:53:52.720 --> 01:53:56.609
nathan olson he's our engineer as well now what is cl

01:53:56.609 --> 01:53:59.520
ustering well i'll make a comment here

01:54:00.720 --> 01:54:03.489
if i can hit one of these buttons there we go it's more

01:54:03.489 --> 01:54:06.079
than just a better view that's one of the

01:54:06.079 --> 01:54:09.409
reasons why people do it now this is a typical linear

01:54:09.409 --> 01:54:12.720
development solution or dentons in our six

01:54:12.720 --> 01:54:16.079
rules and i believe these are four or five plexus i didn't

01:54:16.079 --> 01:54:19.359
count them all uh and the front facade

01:54:19.359 --> 01:54:23.289
looks pretty good there's no garage and but you have to

01:54:23.289 --> 01:54:25.920
have alleys with that and it requires quite

01:54:25.920 --> 01:54:29.020
a bit more concrete and generally unless somebody plants

01:54:29.020 --> 01:54:32.640
trees in the back there's no trees this uh

01:54:32.640 --> 01:54:36.270
five in a row uh concept requires that you have a straight

01:54:36.270 --> 01:54:38.800
street and a flat grade and i think that

01:54:38.800 --> 01:54:42.140
building is about 180 feet long now with the slope that we

01:54:42.140 --> 01:54:44.000
have on our site that doesn't work

01:54:45.279 --> 01:54:48.579
no trees here either maybe now and forever i don't really

01:54:48.579 --> 01:54:50.960
see a place to plant them and sometimes

01:54:50.960 --> 01:54:54.590
people don't do that now this is uh another configuration

01:54:54.590 --> 01:54:56.800
where you've got front driveways

01:54:56.800 --> 01:54:59.810
there's less concrete but there's more cars and then i

01:54:59.810 --> 01:55:01.840
asked the question can you count them all

01:55:01.840 --> 01:55:05.659
well i did there's 20 of them not counting the hood of my

01:55:05.659 --> 01:55:08.319
car now this is another linear concept

01:55:08.319 --> 01:55:11.119
it's in a row and it follows the roadway centerline whether

01:55:11.119 --> 01:55:12.399
it's curved or straight

01:55:14.560 --> 01:55:18.600
and there's no green space there's no commons and i ask the

01:55:18.600 --> 01:55:20.479
question what kind of community do you

01:55:20.479 --> 01:55:22.819
really have you're only going to meet somebody if you walk

01:55:22.819 --> 01:55:26.239
on the sidewalk this is the same property

01:55:26.239 --> 01:55:29.079
a little different configuration which i think is much more

01:55:29.079 --> 01:55:31.039
pleasing i did this in a seminar with

01:55:31.039 --> 01:55:34.670
rick harrison who i think is the greatest designer in the

01:55:34.670 --> 01:55:36.720
world by the way i hope to one day get as

01:55:36.720 --> 01:55:39.810
good as him uh these bedrooms there were two bedroom units

01:55:39.810 --> 01:55:42.159
that's what we thought these would be

01:55:42.159 --> 01:55:45.060
the walkways are pleasant and they're separated from the

01:55:45.060 --> 01:55:47.600
street it's much safer it's more fun to

01:55:47.600 --> 01:55:51.489
walk down and uh it's definitely an improvement for

01:55:51.489 --> 01:55:54.960
children and their safety now this is in houston

01:55:55.680 --> 01:55:59.050
there are row houses with alleys gee they almost look like

01:55:59.050 --> 01:56:01.119
dominoes now i don't know how many were

01:56:01.119 --> 01:56:03.460
in the row i had an area that looked like they were eight

01:56:03.460 --> 01:56:05.600
in a row generally and then there's

01:56:05.600 --> 01:56:10.399
some houses behind others in the cul-de-sac now in grape

01:56:10.399 --> 01:56:13.600
vine clustering here did save some trees

01:56:13.600 --> 01:56:16.779
and their units are smaller and they stair step them down

01:56:16.779 --> 01:56:19.520
the grade the grade drops going uh from

01:56:19.520 --> 01:56:23.359
top to bottom and on this site and this is spencer road in

01:56:23.359 --> 01:56:26.239
denton and this is a type of clustering

01:56:26.239 --> 01:56:29.239
and the units are pretty small i think it's one of the

01:56:29.239 --> 01:56:33.119
better looking rentals in denton now this is

01:56:33.119 --> 01:56:37.039
oak vista and the blue section is our residential part and

01:56:37.039 --> 01:56:39.600
then the other section where it says

01:56:39.600 --> 01:56:42.960
office park that's what we plan to do sometime later when d

01:56:42.960 --> 01:56:45.119
uchess is extended and we'll of course

01:56:45.119 --> 01:56:48.489
pay for part of that you'll notice the red line it's

01:56:48.489 --> 01:56:50.720
vertical uh that all of a sudden

01:56:52.000 --> 01:56:57.060
departs uh where we got the section that is divergent and

01:56:57.060 --> 01:57:00.000
it's a wider area that's bounded

01:57:00.000 --> 01:57:04.029
by the blue green that is the drainage ditch we made it

01:57:04.029 --> 01:57:06.640
wider in fact i did this long before

01:57:06.640 --> 01:57:10.529
we had this am i running out of time let me go back you're

01:57:10.529 --> 01:57:13.199
because you have 10 minutes okay

01:57:14.239 --> 01:57:19.369
all right that's why we widen the channel what would you

01:57:19.369 --> 01:57:21.359
put for the value here

01:57:22.239 --> 01:57:26.380
or this or that i'm a believer in saving trees that's my

01:57:26.380 --> 01:57:27.359
driveway

01:57:28.720 --> 01:57:31.199
this i'm not the only guy that wants to save trees another

01:57:31.199 --> 01:57:33.680
developer did it sometimes we have

01:57:33.680 --> 01:57:38.510
damage sometimes you have surprises like bees this is how

01:57:38.510 --> 01:57:41.840
it was developed we've got

01:57:43.199 --> 01:57:46.829
problem if we try to excavate like this the topography

01:57:46.829 --> 01:57:49.439
would hurt us we would have to dig a lot

01:57:50.319 --> 01:57:55.229
so in this version we made the drawing to where we followed

01:57:55.229 --> 01:57:58.479
the contours as same as this one

01:57:58.720 --> 01:58:01.119
is a little closer look in case you have questions later

01:58:01.119 --> 01:58:04.000
and we've done some floor plans they're

01:58:04.000 --> 01:58:07.829
pretty small have one for empty nesters this one you can

01:58:07.829 --> 01:58:10.079
come in the drive the garage in

01:58:10.079 --> 01:58:15.149
either direction this one is very small and this one is for

01:58:15.149 --> 01:58:18.159
singles so we know that we're going to

01:58:19.039 --> 01:58:21.890
observe the building code and fire code by the type of

01:58:21.890 --> 01:58:23.920
structure and that's one and two family

01:58:23.920 --> 01:58:28.109
building code if there's three it's a separate code so here

01:58:28.109 --> 01:58:30.560
's what we need we we've got a density

01:58:30.560 --> 01:58:34.380
of nr6 the present design density is a little less than

01:58:34.380 --> 01:58:36.479
that we are looking at a gated with

01:58:36.479 --> 01:58:40.399
emergency only on the north now there's a little different

01:58:40.399 --> 01:58:44.079
some of definition there the open layout

01:58:44.079 --> 01:58:48.319
is multi-family the travel lanes radii is multi-family we

01:58:48.319 --> 01:58:50.880
're going to have an hoa for maintenance and

01:58:50.880 --> 01:58:55.109
order but we need one thing more and i talked to cindy jack

01:58:55.109 --> 01:58:57.840
son earlier and i think we're of the same

01:58:57.840 --> 01:59:00.369
mind on this the parking rules would be multi-family

01:59:00.369 --> 01:59:03.119
because it is a multi-family arrangement i just

01:59:03.119 --> 01:59:06.489
want to make sure and that would be uh one parking space

01:59:06.489 --> 01:59:08.800
for each bedroom plus 10 percent

01:59:11.680 --> 01:59:16.479
okay did i make the 10 minutes or close you're good it was

01:59:16.479 --> 01:59:18.159
dinged on you if you went over

01:59:20.079 --> 01:59:22.300
thank you for the presentation thank you see if we have any

01:59:22.300 --> 01:59:23.680
questions for you christian or beck

01:59:24.560 --> 01:59:26.779
thank you chair thank you mr bria you did answer one

01:59:26.779 --> 01:59:29.039
question i think uh how are you going to

01:59:29.039 --> 01:59:32.859
control that emergency lane i believe you're going to put a

01:59:32.859 --> 01:59:35.199
gate a gate there yes there'll be a gate

01:59:35.199 --> 01:59:38.550
there and it'll have an opticon opener so that the fire

01:59:38.550 --> 01:59:41.119
department from the north which is naturally

01:59:41.119 --> 01:59:44.939
where they would come from uh they can get in that way now

01:59:44.939 --> 01:59:48.079
we would like to have an emergency opening

01:59:48.079 --> 01:59:51.899
if we have some type of fire if somebody uh maybe they have

01:59:51.899 --> 01:59:54.239
a car fire at the south gate or something

01:59:54.239 --> 01:59:56.949
so that we can get out that way but it would i would

01:59:56.949 --> 01:59:59.520
imagine almost never be used that way right

02:00:00.079 --> 02:00:05.100
okay good um i was pleased to read uh that you're looking

02:00:05.100 --> 02:00:08.239
for an opportunity to build affordable

02:00:08.880 --> 02:00:11.369
smaller homes uh and that's what it looks like you've got

02:00:11.369 --> 02:00:13.199
here because we were talking earlier

02:00:13.199 --> 02:00:17.020
the need for more affordable homes and so could you give us

02:00:17.020 --> 02:00:18.560
an idea what kind of price

02:00:18.560 --> 02:00:22.000
frames we're looking at it would that be two percent of me

02:00:22.000 --> 02:00:24.640
to certainly i'll tackle that now

02:00:24.640 --> 02:00:26.979
i'm not a builder and i don't know what current building

02:00:26.979 --> 02:00:28.640
prices are but i can tell you the size

02:00:28.640 --> 02:00:34.960
of the units the smallest one is about 1050 square feet

02:00:34.960 --> 02:00:38.319
okay and it does not have a garage

02:00:38.880 --> 02:00:41.789
some of the garages will be detached a garage costs more

02:00:41.789 --> 02:00:43.760
money and of course it seems that most

02:00:43.760 --> 02:00:46.369
people today don't use their garages as garages they just

02:00:46.369 --> 02:00:49.199
store things in them so we decided that

02:00:49.199 --> 02:00:52.539
you know if we put a little more storage in the units and

02:00:52.539 --> 02:00:54.640
we uh and we have carports that are

02:00:54.640 --> 02:00:58.229
covered that would probably work especially at the lower

02:00:58.229 --> 02:01:00.640
end of the market uh our largest unit would

02:01:00.640 --> 02:01:05.439
be 1700 square feet uh we have one unit that's 1300 square

02:01:05.439 --> 02:01:07.680
feet and that one is uh for empty nesters

02:01:07.680 --> 02:01:10.909
that's about the size that they prefer most of them will be

02:01:10.909 --> 02:01:12.640
two bedrooms a few will be three

02:01:12.640 --> 02:01:15.680
bedrooms uh we won't have any one bedrooms because i don't

02:01:15.680 --> 02:01:18.000
think we can get anyone to build one or

02:01:18.000 --> 02:01:22.439
buy one but as far as the pricing goes i guess you could

02:01:22.439 --> 02:01:25.680
multiply though that square footage by

02:01:25.680 --> 02:01:31.239
the price of what it costs to build today did i answer your

02:01:31.239 --> 02:01:34.159
question i think you did

02:01:35.359 --> 02:01:38.680
between you and commissioner smith here um i assume too to

02:01:38.680 --> 02:01:40.079
keep the price down there won't

02:01:40.079 --> 02:01:42.630
be a lot of bells and whistles in there as far as

02:01:42.630 --> 02:01:45.760
appliances and uh flooring and stuff like that or

02:01:45.760 --> 02:01:49.390
is that well i would i would think and and this is not my

02:01:49.390 --> 02:01:51.279
part of the project but it would seem

02:01:51.279 --> 02:01:54.539
logical to me that if you had uh folks that were retired

02:01:54.539 --> 02:01:56.880
and they wanted to retire there and it was

02:01:56.880 --> 02:01:59.659
their last home they might pick granite counters or

02:01:59.659 --> 02:02:02.479
something like that and expensive accoutrements

02:02:03.199 --> 02:02:06.829
but a lot of people who are single who we want to sell to

02:02:06.829 --> 02:02:10.319
uh because there's really no place to get

02:02:10.319 --> 02:02:13.329
anything buy anything like this in denton i think they

02:02:13.329 --> 02:02:15.840
would opt for something less expensive and i

02:02:15.840 --> 02:02:19.470
did talk to a local builder who builds uh houses that aren

02:02:19.470 --> 02:02:21.920
't expensive to pick his brain a little

02:02:21.920 --> 02:02:26.050
and we'll try to follow his advice if we can okay okay i

02:02:26.050 --> 02:02:28.800
didn't mean to corny you there okay

02:02:29.600 --> 02:02:33.039
you also mentioned a shared backyard arrangement structure

02:02:33.039 --> 02:02:35.520
so no fencing at all or just no

02:02:36.720 --> 02:02:40.529
okay just just fences along the back line of the property

02:02:40.529 --> 02:02:42.880
we decided that with what we were trying

02:02:42.880 --> 02:02:47.369
to create that six foot wooden fences would not work but

02:02:47.369 --> 02:02:50.159
people need to feel that part of that

02:02:50.159 --> 02:02:53.819
space is theirs and it's defined so we thought of basically

02:02:53.819 --> 02:02:56.239
a white picket fence or something like

02:02:56.239 --> 02:03:00.380
that and at the corners where we would have a division we

02:03:00.380 --> 02:03:03.279
would probably put some type of marker

02:03:03.279 --> 02:03:06.909
on the ground as long as someone has a feeling of hey this

02:03:06.909 --> 02:03:09.279
space is mine and you're not going to come

02:03:09.279 --> 02:03:12.300
in and you're walking in through our backyard most people

02:03:12.300 --> 02:03:14.239
can live with that especially if your

02:03:14.239 --> 02:03:16.800
neighbors are okay i don't know what you would do in the

02:03:16.800 --> 02:03:19.520
case of a really cranky neighbor but i guess

02:03:19.520 --> 02:03:23.340
that would be for the hoa to handle later okay well i am

02:03:23.340 --> 02:03:25.840
please really based on your narrative

02:03:25.840 --> 02:03:28.890
you know your desire to observe trees keep open spaces

02:03:28.890 --> 02:03:30.800
green areas so this looks like a real good

02:03:30.800 --> 02:03:33.270
development to me thank you for answering my questions

02:03:33.270 --> 02:03:37.279
thank you any other questions yeah

02:03:37.279 --> 02:03:39.199
commissioner sanchez i have a question

02:03:42.239 --> 02:03:45.350
i just wanted to say it's sounds like a pretty interesting

02:03:45.350 --> 02:03:48.000
concept when i was reading the

02:03:48.000 --> 02:03:50.899
information here and you had biplex i was wondering what a

02:03:50.899 --> 02:03:55.199
biplex was well duplexes are usually are

02:03:55.199 --> 02:03:59.020
usually rented right and that's why i coined this other

02:03:59.020 --> 02:04:01.439
word biplex of course then if i try to use

02:04:01.439 --> 02:04:04.670
triplex it doesn't really work out i guess officially you

02:04:04.670 --> 02:04:06.960
might call them single family units

02:04:06.960 --> 02:04:12.069
right right but as i was looking at uh you know uh long-

02:04:12.069 --> 02:04:15.600
term access and and into that area i was

02:04:15.600 --> 02:04:19.420
just curious and i i've mentioned it before is that uh

02:04:19.420 --> 02:04:22.319
using um what is it mockingbird is there any

02:04:22.319 --> 02:04:25.350
long-term planning on maybe coming in through mockingbird

02:04:25.350 --> 02:04:27.279
as opposed to just having one exit

02:04:27.920 --> 02:04:31.520
for that for that area well we had oh because i was gonna i

02:04:31.520 --> 02:04:34.479
was just gonna say that emergency is

02:04:35.279 --> 02:04:39.109
is only for emergency so really you just have one exit that

02:04:39.109 --> 02:04:42.479
's correct yes and what we've tried to do

02:04:42.479 --> 02:04:46.380
to mitigate that circumstance is we have chosen

02:04:46.380 --> 02:04:50.239
deliberately a lesser number of units we're not

02:04:50.239 --> 02:04:53.609
trying to put apartments there so that lessens the number

02:04:53.609 --> 02:04:56.159
of trips also we decided that if we had some

02:04:56.159 --> 02:05:00.079
people who are retired and we're trying to sell maybe 25 of

02:05:00.079 --> 02:05:02.079
the units to retirees or people who

02:05:02.079 --> 02:05:06.109
are 55 plus at least that they tend to get up a little

02:05:06.109 --> 02:05:09.279
later they don't go to work and they

02:05:10.079 --> 02:05:13.710
try to avoid traffic i remember my father's habits before

02:05:13.710 --> 02:05:16.800
he died he would leave about 10 and if he

02:05:16.800 --> 02:05:19.220
had to do something in the afternoon it was always in the

02:05:19.220 --> 02:05:21.119
mid-afternoon and he said i don't need the

02:05:21.119 --> 02:05:25.310
grief of being in the traffic so we think that will shave

02:05:25.310 --> 02:05:27.600
off the peak demand that you might

02:05:27.600 --> 02:05:32.539
normally have now as far as the access uh to the east we

02:05:32.539 --> 02:05:35.920
tried for years i've got a letter that

02:05:35.920 --> 02:05:40.170
goes back to i think 2010 where we tried to talk to uh the

02:05:40.170 --> 02:05:43.359
people who own that land now it's owned

02:05:43.359 --> 02:05:47.180
by trust and the trust does not want to sell just access

02:05:47.180 --> 02:05:49.680
they want to sell the whole piece which is

02:05:49.680 --> 02:05:52.020
not very usable and it snakes all around it's it's

02:05:52.020 --> 02:05:56.239
something that you really can't use we have heard

02:05:56.239 --> 02:06:00.279
though that in that area that there is a local investor who

02:06:00.279 --> 02:06:02.640
builds apartments and was looking to

02:06:02.640 --> 02:06:06.680
buy some of that property on lane street and also further

02:06:06.680 --> 02:06:09.920
to the east and to the south if he did that

02:06:09.920 --> 02:06:13.750
then he obviously could build something that would you know

02:06:13.750 --> 02:06:16.960
be worth his time and then uh with a simple

02:06:16.960 --> 02:06:20.229
s turn you would make mockingbird connect with mockingbird

02:06:20.229 --> 02:06:22.479
but that would run through mr tonic

02:06:22.479 --> 02:06:25.670
less property right through the middle so he would have to

02:06:25.670 --> 02:06:27.439
sell i think he probably would

02:06:28.319 --> 02:06:32.189
maybe that's why he favors this uh this development i don't

02:06:32.189 --> 02:06:33.840
know his reasons but i'll just say yes

02:06:33.840 --> 02:06:41.159
thank you very much okay okay thank you all right i do not

02:06:41.159 --> 02:06:44.720
see any other questions thank you mr

02:06:44.720 --> 02:06:48.539
barrio this is a public hearing anyone else wishing to

02:06:48.539 --> 02:06:50.319
speak we certainly do so

02:06:54.720 --> 02:06:55.729
seeing none i will close the public hearing and open up for

02:06:55.729 --> 02:06:57.840
discussion or motion

02:06:59.920 --> 02:07:04.840
commissioner beck i moved to approve this uh z 18018 i

02:07:04.840 --> 02:07:07.119
think it's an excellent plan i think it

02:07:07.119 --> 02:07:10.760
works well over in this area so i motion to approve and

02:07:10.760 --> 02:07:13.279
commissioner beck for clarification

02:07:13.279 --> 02:07:16.430
are you approving with the two conditions i'm sorry yes i

02:07:16.430 --> 02:07:18.960
am thank you commissioner smith second

02:07:20.399 --> 02:07:23.409
we have a first and a second any discussion seeing none i

02:07:23.409 --> 02:07:25.439
'll call for a vote on the board

02:07:30.159 --> 02:07:35.439
okay motion carries seven zero congratulations

02:07:38.479 --> 02:07:40.520
that concludes the public hearing items for this evening we

02:07:40.520 --> 02:07:43.359
'll move on to the plan and zoning

02:07:43.359 --> 02:07:47.760
project matrix and richard i'll let you take lead initially

02:07:47.760 --> 02:07:49.279
again just wanted to

02:07:50.079 --> 02:07:54.109
highlight some items that we had discussed in work session

02:07:54.109 --> 02:07:56.159
the item with respect to

02:07:56.159 --> 02:07:59.979
traffic engineering items instead of having that on the 10

02:07:59.979 --> 02:08:02.479
24 work session we'll be moving that to

02:08:02.479 --> 02:08:06.960
1114 we also had at the same time a discussion regarding

02:08:06.960 --> 02:08:09.840
the process for infrastructure updates

02:08:10.560 --> 02:08:14.789
since we will we will have water and sewer staff members at

02:08:14.789 --> 02:08:17.039
the next meeting with respect to the

02:08:17.039 --> 02:08:19.750
capital improvements i think we can also still have them

02:08:19.750 --> 02:08:22.159
address some of those concerns with respect to

02:08:23.279 --> 02:08:26.409
to those utilities and then but still have the same

02:08:26.409 --> 02:08:27.840
discussion as part of

02:08:29.680 --> 02:08:33.500
pre-tambing the traffic engineers on on the 14th on the

02:08:33.500 --> 02:08:37.199
historic preservation incentives we are

02:08:37.199 --> 02:08:40.829
working on that i also wanted to let everyone know that

02:08:40.829 --> 02:08:43.680
that the locota group has been in town

02:08:43.680 --> 02:08:47.760
they were at hlc on monday they're the consultant assisting

02:08:47.760 --> 02:08:50.319
with the historic preservation plan

02:08:50.319 --> 02:08:52.880
and so i think right around that time so that that'll be

02:08:52.880 --> 02:08:54.319
also an update on where we are with

02:08:54.319 --> 02:08:57.569
the historic preservation plan but i know that plan was

02:08:57.569 --> 02:08:59.680
also looking at including some of those

02:08:59.680 --> 02:09:04.649
incentives just to give a quick update tree code we are

02:09:04.649 --> 02:09:08.079
working as hailey mentioned earlier and

02:09:08.079 --> 02:09:10.750
kind of pulling pulling it all together we're just we're

02:09:10.750 --> 02:09:12.800
just going through kind of the refining

02:09:12.800 --> 02:09:16.430
process right now we're going back to the committee on the

02:09:16.430 --> 02:09:19.359
environment scheduled to go back on 11-5

02:09:20.319 --> 02:09:22.489
and then we are going to have a work session with the city

02:09:22.489 --> 02:09:24.479
council i believe it's on 11-13

02:09:25.199 --> 02:09:27.149
and so as soon as we get that draft i'll make sure that

02:09:27.149 --> 02:09:28.560
that everyone gets a copy

02:09:29.439 --> 02:09:32.000
and depending where we are on the on the 14th i'll be back

02:09:32.000 --> 02:09:35.279
just giving an update again keep just

02:09:35.279 --> 02:09:37.619
making sure everyone's in the loop and how we're

02:09:37.619 --> 02:09:39.840
progressing how we're progressing with that

02:09:40.880 --> 02:09:45.319
otherwise i think that was it thank you thank you for that

02:09:45.319 --> 02:09:47.439
update anyone have anything to add or

02:09:49.840 --> 02:09:53.029
all right nothing to be added with that we will close the

02:09:53.029 --> 02:10:03.520
planning zoning commission meeting at 7-12