WEBVTT

00:00:00.000 --> 00:00:04.990
for Wednesday September 12th it is 5.03 we'll get started

00:00:04.990 --> 00:00:07.320
with the agenda the

00:00:07.320 --> 00:00:10.839
first items up for discussion would be a clarification of

00:00:10.839 --> 00:00:11.900
the agenda items

00:00:11.900 --> 00:00:18.230
Richard do you have anything to clarify yes just on on the

00:00:18.230 --> 00:00:19.879
consent item number

00:00:19.879 --> 00:00:27.719
2 2c this is the final plat it's the woodlands edition they

00:00:27.719 --> 00:00:28.399
requested that

00:00:28.399 --> 00:00:32.789
this item be postponed to a later date there's some my

00:00:32.789 --> 00:00:34.560
understanding is there's

00:00:34.560 --> 00:00:37.159
some issues with a leasehold interest in the property that

00:00:37.159 --> 00:00:37.960
they want to get

00:00:37.960 --> 00:00:42.039
worked out prior prior to this moving forward

00:00:44.840 --> 00:00:49.960
we're good the only other about moving the yeah go for it

00:00:49.960 --> 00:00:54.399
moving item 3b to 3a

00:00:54.399 --> 00:01:01.590
just a suggestion since it's a 3b to become 3a prior to the

00:01:01.590 --> 00:01:04.120
rezoning request

00:01:04.120 --> 00:01:13.159
since it's fairly they will go to be a to go to be perfect

00:01:13.159 --> 00:01:15.159
yeah that'll help

00:01:15.159 --> 00:01:20.379
those people maybe not have to wait next is the consent

00:01:20.379 --> 00:01:22.120
agenda does anyone have

00:01:22.120 --> 00:01:26.959
any questions on either one it's probably worth pointing

00:01:26.959 --> 00:01:30.920
out that item 2a is being

00:01:30.920 --> 00:01:33.510
discussed in length in the public hearing so we want to if

00:01:33.510 --> 00:01:34.079
you have any

00:01:34.079 --> 00:01:39.959
questions on that be prudent to have that squared away

00:01:40.920 --> 00:01:43.920
yep

00:01:45.120 --> 00:01:50.200
Mr. Ellis thank you chair yeah I guess my question yeah is

00:01:50.200 --> 00:01:50.840
relevant to that

00:01:50.840 --> 00:01:55.829
because with the preliminary plat in the write-up that that

00:01:55.829 --> 00:01:58.040
is with the a esa it

00:01:58.040 --> 00:02:01.519
talks about two entries off of Country Club Road but I only

00:02:01.519 --> 00:02:02.400
saw one on the

00:02:02.400 --> 00:02:07.519
prelim plat am I missing one am I just not seeing it no you

00:02:07.519 --> 00:02:09.280
are correct the

00:02:09.280 --> 00:02:12.000
preliminary plat it's been through sorry that's the

00:02:12.000 --> 00:02:14.080
incorrect one it has been

00:02:14.080 --> 00:02:16.639
through a couple of renditions we've settled on this one

00:02:16.639 --> 00:02:17.520
point of access on

00:02:17.520 --> 00:02:20.129
Country Club the second point of access for emergency

00:02:20.129 --> 00:02:21.240
services will be this

00:02:21.240 --> 00:02:25.240
connection to Meadowlands okay so it's just one access off

00:02:25.240 --> 00:02:26.039
of correct okay

00:02:26.039 --> 00:02:29.620
understood thank you no there will be a temporary

00:02:29.620 --> 00:02:30.879
construction access I believe

00:02:30.879 --> 00:02:34.060
here where the existing driveway is for phase one

00:02:34.060 --> 00:02:36.159
construction this phase two is

00:02:36.159 --> 00:02:39.400
pending the ultimate alignment of a Country Club Road with

00:02:39.400 --> 00:02:40.319
which text on is

00:02:40.319 --> 00:02:43.400
coordinating at this point in time

00:02:47.560 --> 00:02:49.259
is the only question to see for that does anyone have any

00:02:49.259 --> 00:02:51.280
questions on to be

00:02:51.280 --> 00:02:55.879
as that's also under Haley

00:02:59.919 --> 00:03:03.560
perfect thank you very much Haley that gets us going to the

00:03:03.560 --> 00:03:05.840
public hearings

00:03:05.840 --> 00:03:10.009
we'll start with the updated version starting with the new

00:03:10.009 --> 00:03:11.120
3a the final

00:03:11.120 --> 00:03:20.439
replat fr 18 0005 that is Cindy Jackson

00:03:33.560 --> 00:03:39.379
okay this is a request to replat a lot in into two lots the

00:03:39.379 --> 00:03:41.360
site is located in

00:03:41.360 --> 00:03:45.879
the city's extraterritorial jurisdiction or ETJ the purpose

00:03:45.879 --> 00:03:46.120
of the

00:03:46.120 --> 00:03:51.710
replat is to subdivide lot 1r into two lots this is one of

00:03:51.710 --> 00:03:52.919
the lots and the

00:03:52.919 --> 00:03:56.289
other one is the remainder of the site with this not

00:03:56.289 --> 00:03:58.120
connect this connects the

00:03:58.120 --> 00:04:05.129
two sides the site is located on the west side of Hilltop

00:04:05.129 --> 00:04:06.680
Road and it meets

00:04:06.680 --> 00:04:10.639
all the requirements of the subdivision plot subdivision

00:04:10.639 --> 00:04:11.360
requirements and we

00:04:11.360 --> 00:04:18.279
recommend approval any questions for Cindy

00:04:20.040 --> 00:04:26.990
perfect thank you very much Cindy that moves us to 3b the

00:04:26.990 --> 00:04:30.160
zoning item z 18 20a

00:04:30.160 --> 00:04:33.680
which is also Cindy Jackson

00:04:45.000 --> 00:04:53.970
okay this request is a city initiated zoning request I

00:04:53.970 --> 00:04:57.600
placed at your each of

00:04:57.600 --> 00:05:00.819
you received a copy of all the property owner responses

00:05:00.819 --> 00:05:02.040
that we received as a

00:05:02.040 --> 00:05:05.620
result of the notification one of them the very last one is

00:05:05.620 --> 00:05:06.639
not located within

00:05:06.639 --> 00:05:10.639
the 200 foot notification buffer it was not counted as a

00:05:10.639 --> 00:05:13.399
percentage against the

00:05:13.399 --> 00:05:18.829
request however I included it with your copies for

00:05:18.829 --> 00:05:22.279
information okay z 18 20

00:05:22.279 --> 00:05:26.689
Creekside is a request to make a recommendation to the City

00:05:26.689 --> 00:05:27.360
Council

00:05:27.360 --> 00:05:30.649
regarding an initial zoning designation of neighborhood

00:05:30.649 --> 00:05:32.079
residential 3 and our

00:05:32.079 --> 00:05:37.470
three on approximately 47.466 acres which you can see right

00:05:37.470 --> 00:05:39.160
here the property is

00:05:39.160 --> 00:05:44.579
located between Ryan Road to the north and Creekdale view

00:05:44.579 --> 00:05:45.879
down here to the

00:05:45.879 --> 00:05:52.839
south this site was the subject of a pre annexation

00:05:52.839 --> 00:05:54.439
development agreement that

00:05:54.439 --> 00:05:59.860
was approved by the City Council in 2016 its ordinance 2016

00:05:59.860 --> 00:06:02.560
- 215 this what I'm

00:06:02.560 --> 00:06:06.560
calling the Pata this govern the sequence of development

00:06:06.560 --> 00:06:08.680
for this site it

00:06:08.680 --> 00:06:13.029
contains in addition to containing a schedule for each each

00:06:13.029 --> 00:06:13.680
phase of

00:06:13.680 --> 00:06:17.240
entitlement it also contains land use and development

00:06:17.240 --> 00:06:22.639
standards the plot for

00:06:22.639 --> 00:06:27.050
the site was approved on March 21st 2018 and the site was

00:06:27.050 --> 00:06:28.399
recently annexed into

00:06:28.399 --> 00:06:34.800
the city just just a few weeks ago I think it was

00:06:34.800 --> 00:06:39.459
mr. Beck thank you chair Cindy it's just dawning on me we

00:06:39.459 --> 00:06:40.439
've dealt with this

00:06:40.439 --> 00:06:46.439
already and in the opposition to it so we approved a plan

00:06:46.439 --> 00:06:47.800
before it was zone

00:06:47.800 --> 00:06:55.480
yep I'll get to that okay the site has 137 residential lots

00:06:55.480 --> 00:06:56.839
with the density of

00:06:56.839 --> 00:07:00.629
2.9 dwelling units per acre which complies with the nr3

00:07:00.629 --> 00:07:01.600
zoning that is

00:07:01.600 --> 00:07:06.399
requested the Pata complaint contains robust development

00:07:06.399 --> 00:07:07.480
standards that exceed

00:07:07.480 --> 00:07:11.009
what we have currently in our dent and development code and

00:07:11.009 --> 00:07:12.560
our requirements

00:07:12.560 --> 00:07:16.079
with regards to such things as traffic impact fees

00:07:16.079 --> 00:07:17.600
typically a traffic impact

00:07:17.600 --> 00:07:20.069
fee for something this this size would be three thousand

00:07:20.069 --> 00:07:21.120
four hundred and twenty

00:07:21.120 --> 00:07:25.980
three thousand four hundred and two dollars and you can see

00:07:25.980 --> 00:07:26.839
it right now I'm

00:07:26.839 --> 00:07:31.430
sorry and we have tree preservation standards typical right

00:07:31.430 --> 00:07:32.560
now we require

00:07:32.560 --> 00:07:37.220
20% the as a result of the requirements of the Pata the

00:07:37.220 --> 00:07:38.680
applicant is actually

00:07:38.680 --> 00:07:44.490
preserving 76% is required to preserve 76% of the diameter

00:07:44.490 --> 00:07:48.439
inches and 82% of

00:07:48.439 --> 00:07:54.029
all trees is what is being preserved right now you can see

00:07:54.029 --> 00:07:55.480
the preservation

00:07:55.480 --> 00:08:01.639
areas right along here and along the southern boundary as

00:08:01.639 --> 00:08:03.399
well as this is not

00:08:03.399 --> 00:08:06.920
this is the boundary line and you can see that there's

00:08:06.920 --> 00:08:07.839
further tree

00:08:07.839 --> 00:08:12.529
preservation proposed for the remaining two tracts of land

00:08:12.529 --> 00:08:14.680
that are in included

00:08:14.680 --> 00:08:18.800
in the Pata however they are not the subject of tonight's

00:08:18.800 --> 00:08:22.879
discussion here is

00:08:22.879 --> 00:08:27.009
table showing the total trees that were required to be

00:08:27.009 --> 00:08:28.040
preserved trees

00:08:28.040 --> 00:08:33.120
preserved trees removed percent preserved is eighty one

00:08:33.120 --> 00:08:33.519
point nine

00:08:33.519 --> 00:08:38.230
percent total inches of trees on this side is ten thousand

00:08:38.230 --> 00:08:39.120
five hundred and

00:08:39.120 --> 00:08:42.399
twenty point eight they preserved eight thousand twenty

00:08:42.399 --> 00:08:43.679
seven point eight inches

00:08:43.679 --> 00:08:51.190
and removed twenty four hundred and ninety three percent

00:08:51.190 --> 00:08:55.279
preserved is seventy six point three percent

00:08:56.519 --> 00:09:00.539
now we'll get to your question the typical sequence of

00:09:00.539 --> 00:09:03.600
development is first

00:09:03.600 --> 00:09:07.980
we annex then we zone the property then we get site plan

00:09:07.980 --> 00:09:09.639
approval then we do

00:09:09.639 --> 00:09:13.919
preliminary and final plot per the Pata we did the pre

00:09:13.919 --> 00:09:15.399
annexation development

00:09:15.399 --> 00:09:20.019
agreement we did a concept plan a site plan a preliminary

00:09:20.019 --> 00:09:22.279
and final plot then

00:09:22.279 --> 00:09:25.059
annexation that were required to come in and apply for

00:09:25.059 --> 00:09:26.480
annexation within ten days

00:09:26.480 --> 00:09:30.200
after the approval of the final plot and the final step is

00:09:30.200 --> 00:09:31.960
zoning which is where

00:09:31.960 --> 00:09:39.919
we are tonight the current zoning is already 5x as you can

00:09:39.919 --> 00:09:40.679
see on this slide

00:09:40.679 --> 00:09:47.309
and the proposed zoning is nr3 the nr3 presents a effective

00:09:47.309 --> 00:09:48.240
transition and

00:09:48.240 --> 00:09:55.059
buffer between the nr4 to the south and west and the nr2 to

00:09:55.059 --> 00:09:58.039
the north staff sent

00:09:58.039 --> 00:10:01.379
legal notices has put a legal notice in the newspaper we

00:10:01.379 --> 00:10:03.200
sent out 96 notices

00:10:03.200 --> 00:10:08.169
via certified mail and 192 courtesy notices via regular

00:10:08.169 --> 00:10:10.000
mail we received six

00:10:10.000 --> 00:10:13.929
notices in response representing three percent of the

00:10:13.929 --> 00:10:15.440
property located within

00:10:15.440 --> 00:10:18.250
that the 200 foot boundary and you can see them in red here

00:10:18.250 --> 00:10:19.000
some of them are

00:10:19.000 --> 00:10:23.070
hard to see because they're just little slivers of land on

00:10:23.070 --> 00:10:24.480
the edge and we

00:10:24.480 --> 00:10:27.419
received one from outside the 200 foot boundary which I

00:10:27.419 --> 00:10:29.799
also included we posted

00:10:29.799 --> 00:10:34.529
three notification signs we recommend approval of this

00:10:34.529 --> 00:10:36.039
request as it is

00:10:36.039 --> 00:10:39.000
compatible with the surrounding property is consistent with

00:10:39.000 --> 00:10:39.960
the requirements set

00:10:39.960 --> 00:10:43.139
forth in and is consistent with the requirements set forth

00:10:43.139 --> 00:10:43.600
in the pre

00:10:43.600 --> 00:10:47.679
annexation agreement ordinance number 2016 - two one five

00:10:47.679 --> 00:10:49.320
and that concludes my

00:10:49.320 --> 00:10:58.440
presentation Chris are back make sure go back to the Google

00:10:58.440 --> 00:10:59.759
there the little

00:10:59.759 --> 00:11:03.990
extension that you called it a buffer this extent this

00:11:03.990 --> 00:11:06.559
right here yes there's

00:11:06.559 --> 00:11:09.740
no I've actually there's a buffer here and a buffer here

00:11:09.740 --> 00:11:10.480
you see the existing

00:11:10.480 --> 00:11:15.159
trees right this is if you if it has been planted as a

00:11:15.159 --> 00:11:16.600
street okay that's what

00:11:16.600 --> 00:11:20.389
I was and so there is going to be access out of that new

00:11:20.389 --> 00:11:21.960
subdivision to the south

00:11:21.960 --> 00:11:26.490
that will connect to okay not just on Ryan no yeah okay

00:11:26.490 --> 00:11:31.879
thank you any other

00:11:31.879 --> 00:11:36.990
questions so I have I have one question and maybe Richard

00:11:36.990 --> 00:11:38.200
or legal can help me

00:11:38.200 --> 00:11:44.080
process this the the reverse of procedures is that kind of

00:11:44.080 --> 00:11:44.639
neutering our

00:11:44.639 --> 00:11:47.320
ability to make a decision here is it a foregone conclusion

00:11:47.320 --> 00:11:48.039
that we have to

00:11:48.039 --> 00:11:50.899
approve this or what happens if we don't approve this if

00:11:50.899 --> 00:11:52.039
the Commission deems

00:11:52.039 --> 00:11:54.570
that it should be in our - not in our three as the

00:11:54.570 --> 00:11:56.600
neighboring neighborhood is

00:11:56.600 --> 00:11:59.490
directly to the West it's an inner to neighborhood at the

00:11:59.490 --> 00:12:01.480
north what happens

00:12:01.480 --> 00:12:04.340
here has there been a protection to the applicant of some

00:12:04.340 --> 00:12:05.919
sort of promise that

00:12:05.919 --> 00:12:08.870
they will get zoned this way or I'm just curious about our

00:12:08.870 --> 00:12:10.120
actual power and

00:12:10.120 --> 00:12:15.549
making a recommendation here yeah the only statement in the

00:12:15.549 --> 00:12:16.320
development

00:12:16.320 --> 00:12:21.539
agreement is that the city will pursue or initiate a rez

00:12:21.539 --> 00:12:22.879
oning for this

00:12:22.879 --> 00:12:29.309
particular zoning classification and that the applicant or

00:12:29.309 --> 00:12:30.720
the developer will

00:12:30.720 --> 00:12:36.309
not object to that as an initial zoning it doesn't say the

00:12:36.309 --> 00:12:37.840
the the city can't by

00:12:37.840 --> 00:12:41.769
contract establish any particular zoning classification it

00:12:41.769 --> 00:12:42.679
still has to go

00:12:42.679 --> 00:12:45.309
through the process it still has to receive a

00:12:45.309 --> 00:12:47.080
recommendation and it still

00:12:47.080 --> 00:12:50.679
has to go forward to counsel for approval just like any

00:12:50.679 --> 00:12:51.879
other zoning case

00:12:51.879 --> 00:12:57.799
and so that that I and I did have in here mark when it was

00:12:57.799 --> 00:12:59.120
referred to as a

00:12:59.120 --> 00:13:04.000
sequence of entitlements I you know I I don't think that a

00:13:04.000 --> 00:13:05.600
development agreement

00:13:05.600 --> 00:13:10.320
can properly create an entitlement to a particular zoning

00:13:10.320 --> 00:13:12.120
it promises that the

00:13:12.120 --> 00:13:16.129
city will initiate a case to rezone it to this particular

00:13:16.129 --> 00:13:17.480
zoning classification

00:13:17.480 --> 00:13:24.440
I appreciate that can you help me Cindy you might know or

00:13:24.440 --> 00:13:25.039
Richard might be

00:13:25.039 --> 00:13:27.629
shed light why they wouldn't go ahead and make sure his

00:13:27.629 --> 00:13:28.440
zoning gets approved

00:13:28.440 --> 00:13:31.299
before doing this was this an efficiency question it seems

00:13:31.299 --> 00:13:32.519
like they did a lot of

00:13:32.519 --> 00:13:35.889
work with a question still lingering that I'm not sure

00:13:35.889 --> 00:13:37.960
because it was it was 2016

00:13:37.960 --> 00:13:41.590
the only the only thing I could venture to guess is the the

00:13:41.590 --> 00:13:42.639
plat happened to be

00:13:42.639 --> 00:13:47.190
approved prior to annexation so that even if the zoning I

00:13:47.190 --> 00:13:48.419
guess is denied they

00:13:48.419 --> 00:13:51.659
do have a plot that was approved prior to annexing into the

00:13:51.659 --> 00:13:53.600
city right I was

00:13:53.600 --> 00:13:56.059
not the planner that worked on this I wasn't involved in

00:13:56.059 --> 00:13:58.759
the least I think what

00:13:58.759 --> 00:14:00.899
Richard said is correct it could be that when they

00:14:00.899 --> 00:14:02.279
submitted an application for a

00:14:02.279 --> 00:14:05.100
plot it was discovered they had a non annexation agreement

00:14:05.100 --> 00:14:06.000
on the site which

00:14:06.000 --> 00:14:09.409
it did and for the non annexation agreement when you

00:14:09.409 --> 00:14:11.080
develop the site you

00:14:11.080 --> 00:14:14.379
have to annex into the city prior to development so they

00:14:14.379 --> 00:14:16.440
worked out this this

00:14:16.440 --> 00:14:19.970
agreement this way and and the the pre annexation

00:14:19.970 --> 00:14:21.639
development agreement that is

00:14:21.639 --> 00:14:28.759
a codified like pathway actually a non annexation agreement

00:14:28.759 --> 00:14:30.759
okay I'm sorry the

00:14:30.759 --> 00:14:36.179
the pre annexation agreement is not codified there there is

00:14:36.179 --> 00:14:37.279
in the Texas

00:14:37.279 --> 00:14:39.440
local government code a provision for a non annexation

00:14:39.440 --> 00:14:40.399
agreement which what I

00:14:40.399 --> 00:14:43.809
thought you were asking about but I guess to put a little

00:14:43.809 --> 00:14:44.840
bit sharper point

00:14:44.840 --> 00:14:48.019
on the question about the sequencing the city actually

00:14:48.019 --> 00:14:49.240
cannot initiate zoning

00:14:49.240 --> 00:14:52.830
until the property is annexed because it has no

00:14:52.830 --> 00:14:55.919
jurisdiction for zoning until or

00:14:55.919 --> 00:14:58.809
unless the properties within the city limits and this was

00:14:58.809 --> 00:14:59.879
the majority of work

00:14:59.879 --> 00:15:03.480
was done prior to the annexation that's correct I got you I

00:15:03.480 --> 00:15:04.399
think commissioner

00:15:04.399 --> 00:15:07.580
Ellis and then Commissioner Beck thank you sure well it's

00:15:07.580 --> 00:15:08.240
along the same line

00:15:08.240 --> 00:15:12.169
of what we're discussing so who decide how did we get to a

00:15:12.169 --> 00:15:13.679
final plat before we

00:15:13.679 --> 00:15:18.200
had an annex property and how to what who decides a pre

00:15:18.200 --> 00:15:19.679
annexation development

00:15:19.679 --> 00:15:22.269
agreement I mean is that just how you got out of it because

00:15:22.269 --> 00:15:23.159
we had a final plat

00:15:23.159 --> 00:15:30.159
I'm confused how we go out of the typical sequence of

00:15:30.159 --> 00:15:30.159
development I

00:15:30.159 --> 00:15:34.240
understand and I really I'm not sure my thinking is since

00:15:34.240 --> 00:15:35.799
they had already had

00:15:35.799 --> 00:15:40.429
the site designed and they had a a plat submitted this is

00:15:40.429 --> 00:15:42.080
theoretical if they

00:15:42.080 --> 00:15:45.559
already had submitted what they what staff and the

00:15:45.559 --> 00:15:46.399
applicant might have done

00:15:46.399 --> 00:15:51.009
was work out a situation where we can get the a bigger

00:15:51.009 --> 00:15:53.200
bigger bang for this by

00:15:53.200 --> 00:15:58.620
having them agree to standards that are above and beyond

00:15:58.620 --> 00:16:00.080
what we require in

00:16:00.080 --> 00:16:02.759
exchange for okay we'll approve this plot but you need to

00:16:02.759 --> 00:16:03.919
go through these steps

00:16:03.919 --> 00:16:08.440
too in order for us to approve this plot right but I mean

00:16:08.440 --> 00:16:09.360
it wasn't a surprise

00:16:09.360 --> 00:16:14.470
that it wasn't you know in the city limits at the time so

00:16:14.470 --> 00:16:14.559
well you'd be

00:16:14.559 --> 00:16:20.149
surprised the the the property that has pre annexation I

00:16:20.149 --> 00:16:21.559
mean non annexation

00:16:21.559 --> 00:16:27.210
agreements we've had several instances where the somebody a

00:16:27.210 --> 00:16:28.360
developer comes

00:16:28.360 --> 00:16:31.250
forward and offers to purchase it and and they come to us

00:16:31.250 --> 00:16:32.360
and we're like well

00:16:32.360 --> 00:16:35.940
no you've got a there there is this non annexation

00:16:35.940 --> 00:16:37.840
agreement on here this is

00:16:37.840 --> 00:16:40.440
what you're gonna have to do and in this instance and I'm

00:16:40.440 --> 00:16:41.320
not sure why because I

00:16:41.320 --> 00:16:46.039
wouldn't involved they decided to do this development

00:16:46.039 --> 00:16:47.080
agreement which

00:16:47.080 --> 00:16:53.149
resulted in higher standards of design standards have we

00:16:53.149 --> 00:16:54.639
done pre annexation

00:16:54.639 --> 00:16:59.240
development agreements in the past does anyone know my

00:16:59.240 --> 00:17:00.080
understanding this is the

00:17:00.080 --> 00:17:04.079
only one that I'm aware of that was done in 2016 I know the

00:17:04.079 --> 00:17:04.920
applicant you know

00:17:04.920 --> 00:17:06.839
will be at the meeting that could address some of the

00:17:06.839 --> 00:17:07.519
questions as to how

00:17:07.519 --> 00:17:11.869
how it sort of developed at that time prior to the prior to

00:17:11.869 --> 00:17:12.759
the the non

00:17:12.759 --> 00:17:18.349
annexation agreement expiring it just is odd because as

00:17:18.349 --> 00:17:19.599
chair said it's almost

00:17:19.599 --> 00:17:23.039
like we kind of have to we've gotten this far we've got a

00:17:23.039 --> 00:17:24.200
final plat the only

00:17:24.200 --> 00:17:27.400
way the final plaque can be done is if we have this zoning

00:17:27.400 --> 00:17:28.160
I mean otherwise

00:17:28.160 --> 00:17:31.640
it's not gonna work yeah in this in this instance because

00:17:31.640 --> 00:17:33.720
we do have we do still

00:17:33.720 --> 00:17:38.039
have authority within the ETJ for final plat approval and

00:17:38.039 --> 00:17:39.720
so that's that's what

00:17:39.720 --> 00:17:42.970
I'm again venturing to guess was the premise behind having

00:17:42.970 --> 00:17:44.000
it go having it

00:17:44.000 --> 00:17:48.930
go before this if I if I could reword that if I understand

00:17:48.930 --> 00:17:49.480
what you're saying

00:17:49.480 --> 00:17:51.940
correctly is there was a non-exation agreement that needed

00:17:51.940 --> 00:17:52.680
to be expired but

00:17:52.680 --> 00:17:54.690
they were able to get some work done leading up to that

00:17:54.690 --> 00:17:56.079
expiration so they

00:17:56.079 --> 00:17:59.720
were kind of able to burn the candle while waiting for that

00:17:59.720 --> 00:18:00.319
annexation to

00:18:00.319 --> 00:18:04.980
happen this annexation agreement the the the the PADA was

00:18:04.980 --> 00:18:06.359
approved in September

00:18:06.359 --> 00:18:11.779
that same month September of 2016 that same month the non

00:18:11.779 --> 00:18:12.880
annexation agreement

00:18:12.880 --> 00:18:17.839
was set to expire okay okay Chris you're back thank you

00:18:17.839 --> 00:18:19.279
chair kind of back to your

00:18:19.279 --> 00:18:24.059
question if what option do we have here if I mean they

00:18:24.059 --> 00:18:25.640
obviously the preliminary

00:18:25.640 --> 00:18:28.859
and final class was set up for an NR3 but if we say do we

00:18:28.859 --> 00:18:29.759
have the option to

00:18:29.759 --> 00:18:34.079
say no we'll agree to an NR2 then they'd have to go back

00:18:34.079 --> 00:18:35.799
and do preliminary and

00:18:35.799 --> 00:18:39.730
final plants do we have that option that's one question and

00:18:39.730 --> 00:18:40.920
if we do and

00:18:40.920 --> 00:18:44.240
agree to do that then they'd have to go back through the

00:18:44.240 --> 00:18:47.200
process is that correct

00:18:47.240 --> 00:18:53.299
well I know that if they have a plat that doesn't do what

00:18:53.299 --> 00:18:55.240
they intend to do

00:18:55.240 --> 00:18:58.819
you know or what they can legally do under whatever zoning

00:18:58.819 --> 00:18:59.920
they ultimately

00:18:59.920 --> 00:19:03.670
wind up with then they're not going to be allowed to build

00:19:03.670 --> 00:19:05.720
under that plat but

00:19:05.720 --> 00:19:09.430
and they're going to have to pursue some other option but I

00:19:09.430 --> 00:19:10.799
think the whole point

00:19:10.799 --> 00:19:13.980
of the pre annexation development agreement and I wasn't

00:19:13.980 --> 00:19:14.799
involved in it

00:19:14.799 --> 00:19:17.759
either I and I don't know the history of it I'm kind of in

00:19:17.759 --> 00:19:18.839
the same position that

00:19:18.839 --> 00:19:22.849
the planning staff is in but looking at it just kind of

00:19:22.849 --> 00:19:24.559
from the outside in it

00:19:24.559 --> 00:19:29.450
looks like it was an effort to legally do what the

00:19:29.450 --> 00:19:32.240
expectations were a lot of

00:19:32.240 --> 00:19:36.309
people are saying you know gee can we can we zone this at

00:19:36.309 --> 00:19:37.200
the time of

00:19:37.200 --> 00:19:41.509
annexation well technically you can't you can't you can't

00:19:41.509 --> 00:19:42.759
zone until after the

00:19:42.759 --> 00:19:48.720
property is annexed but you know with with the idea of

00:19:48.720 --> 00:19:51.079
pursuing this you know

00:19:51.079 --> 00:19:56.200
it's at least one way of going after this again the city's

00:19:56.200 --> 00:19:56.920
obligation with

00:19:56.920 --> 00:20:00.420
regard to zoning is not to guarantee any particular zoning

00:20:00.420 --> 00:20:01.279
goes in but to

00:20:01.279 --> 00:20:06.170
initiate the case and if that causes problem well at least

00:20:06.170 --> 00:20:07.480
the city kept this

00:20:07.480 --> 00:20:12.900
end of the bargain but you know clearly you know all non

00:20:12.900 --> 00:20:14.079
annexation agreements

00:20:14.079 --> 00:20:17.000
are pre annexation development agreements I mean that's

00:20:17.000 --> 00:20:17.359
that's that's

00:20:17.359 --> 00:20:19.920
their structure they're all pre annexation development

00:20:19.920 --> 00:20:20.359
groups they were

00:20:20.359 --> 00:20:23.539
just pre annexation development agreements that provide

00:20:23.539 --> 00:20:24.000
that any

00:20:24.000 --> 00:20:27.180
development that you do was going to be agricultural in

00:20:27.180 --> 00:20:28.480
nature and that if you do

00:20:28.480 --> 00:20:33.039
anything other than agricultural you come in to the city as

00:20:33.039 --> 00:20:34.119
a voluntary

00:20:34.119 --> 00:20:37.910
annexation that's part of the terms you could you could

00:20:37.910 --> 00:20:39.559
prescribe uses of land

00:20:39.559 --> 00:20:43.759
in a pre annexation development agreement which this did

00:20:43.759 --> 00:20:45.140
but that you

00:20:45.140 --> 00:20:49.930
cannot promise by contract you cannot promise you know a

00:20:49.930 --> 00:20:51.640
particular zoning

00:20:51.640 --> 00:20:57.109
classification you know as the city seems like for good

00:20:57.109 --> 00:20:57.200
reason to me too

00:20:57.200 --> 00:21:01.640
because I'm not saying I have a problem with the nr3 they

00:21:01.640 --> 00:21:03.019
've got some good

00:21:03.019 --> 00:21:05.490
buffers here and everything but we've obviously got some

00:21:05.490 --> 00:21:06.079
concerns by the

00:21:06.079 --> 00:21:09.539
surrounding neighborhoods and I understand that but it's we

00:21:09.539 --> 00:21:10.359
come into

00:21:10.359 --> 00:21:13.160
this with our hands tied almost and that's unusual that's

00:21:13.160 --> 00:21:14.519
what bothers me

00:21:14.519 --> 00:21:18.839
you know so I don't want to go back and say no we're not

00:21:18.839 --> 00:21:19.000
gonna do anything in our two

00:21:19.000 --> 00:21:23.599
just to just to show them but hopefully we won't face this

00:21:23.599 --> 00:21:24.519
in the future I

00:21:24.519 --> 00:21:28.160
listen this is weird but I wanted to see what our options

00:21:28.160 --> 00:21:29.519
were there I said

00:21:29.519 --> 00:21:33.049
unless you said to that you know any non-accession

00:21:33.049 --> 00:21:34.640
agreement anticipates

00:21:34.640 --> 00:21:39.630
zoning and I agree but zoning first then plants you know

00:21:39.630 --> 00:21:40.319
and this has been

00:21:40.319 --> 00:21:44.079
reversed here so right yeah and I suspect that it was an

00:21:44.079 --> 00:21:45.720
effort to try to

00:21:45.720 --> 00:21:51.319
accommodate a desired development and use in a manner that

00:21:51.319 --> 00:21:52.920
that staff assumed

00:21:52.920 --> 00:21:57.349
would be non-controversial as proposed and so you know I

00:21:57.349 --> 00:21:58.519
doubt that there's any

00:21:58.519 --> 00:22:02.240
kind of intent to tying one's hands here again speaking

00:22:02.240 --> 00:22:03.559
from position of ignorance

00:22:03.559 --> 00:22:08.779
but it was it was an effort to put that into place it

00:22:08.779 --> 00:22:10.279
obviously was approved the

00:22:10.279 --> 00:22:17.099
City Council did approve the agreement and so you know by

00:22:17.099 --> 00:22:18.400
all appearances it

00:22:18.400 --> 00:22:23.000
appeared that the city had no problems with this

00:22:23.920 --> 00:22:27.910
Michelle's thank you chair well I guess I mean I guess just

00:22:27.910 --> 00:22:28.880
my final thought on

00:22:28.880 --> 00:22:32.180
that is I mean it does feel like our hands are tied with

00:22:32.180 --> 00:22:33.440
the typical order

00:22:33.440 --> 00:22:35.960
which is over there and the order we're dealing with over

00:22:35.960 --> 00:22:38.440
here and again I don't

00:22:38.440 --> 00:22:42.599
know that it's a terrible fit either it just feels wrong

00:22:42.599 --> 00:22:44.960
and it would be my hope

00:22:44.960 --> 00:22:49.769
that we don't do this again and we do an order that makes

00:22:49.769 --> 00:22:51.359
sense because this

00:22:51.359 --> 00:22:54.680
order doesn't make sense to me

00:22:56.920 --> 00:23:00.519
Christian back thank you sure one of the thing I guess too

00:23:00.519 --> 00:23:03.160
that the surrounding

00:23:03.160 --> 00:23:06.500
neighborhoods concerned about is the added traffic and we

00:23:06.500 --> 00:23:07.559
discussed that when

00:23:07.559 --> 00:23:10.859
we were dealing with the site plans and and understood

00:23:10.859 --> 00:23:13.359
their concerns so I could

00:23:13.359 --> 00:23:18.950
see why and I don't know if it would appease them but a

00:23:18.950 --> 00:23:20.319
less dense zoning

00:23:20.319 --> 00:23:23.269
district you know might all sit some of that traffic

00:23:23.269 --> 00:23:24.319
probably not enough to make

00:23:24.319 --> 00:23:27.799
a big difference but anyway that was just a thought I had

00:23:27.799 --> 00:23:29.240
out there throwing

00:23:29.240 --> 00:23:33.980
the mix I do want to point out that the applicant has

00:23:33.980 --> 00:23:35.960
actually

00:23:36.759 --> 00:23:41.609
anticipated that traffic is somewhat and the traffic impact

00:23:41.609 --> 00:23:43.200
fees that were paid

00:23:43.200 --> 00:23:48.619
for this property are forty three hundred dollars per unit

00:23:48.619 --> 00:23:49.519
this is greater

00:23:49.519 --> 00:23:53.839
than the twenty five hundred dollars per unit required by

00:23:53.839 --> 00:23:55.440
the DC and the impact

00:23:55.440 --> 00:23:59.640
fee ordinance the traffic engineering is in the process of

00:23:59.640 --> 00:24:00.920
conducting trip counts

00:24:00.920 --> 00:24:03.720
right now along Ryan Road because they are aware of the

00:24:03.720 --> 00:24:04.920
situation as well and

00:24:04.920 --> 00:24:08.730
we've got other developments coming in that will impact it

00:24:08.730 --> 00:24:10.079
and funding for the

00:24:10.079 --> 00:24:13.890
an update to the mobility plan so that we can pursue the

00:24:13.890 --> 00:24:15.359
improvements of Ryan

00:24:15.359 --> 00:24:18.309
Road was approved by council last night and they are

00:24:18.309 --> 00:24:19.880
actively working towards

00:24:19.880 --> 00:24:27.140
trying to alleviate the situation so senior final words

00:24:27.140 --> 00:24:29.400
from myself I'm glad

00:24:29.400 --> 00:24:31.859
you brought up traffic that's good to hear because I live

00:24:31.859 --> 00:24:32.599
in the general

00:24:32.599 --> 00:24:37.269
vicinity of the area and I got peppered with questions two

00:24:37.269 --> 00:24:39.359
of them namely one is

00:24:39.359 --> 00:24:42.859
when are we gonna get a light at Ryan Road in 1830 that

00:24:42.859 --> 00:24:43.880
seems to be a large

00:24:43.880 --> 00:24:47.809
concern of those residents and then traffic on on Ryan was

00:24:47.809 --> 00:24:48.759
concerned so

00:24:48.759 --> 00:24:52.450
hopefully the updated mobility plan can can allocate some

00:24:52.450 --> 00:24:53.799
resources there and

00:24:53.799 --> 00:24:57.019
then their impact fees can immediately go towards and I

00:24:57.019 --> 00:24:58.240
know the the light at

00:24:58.240 --> 00:25:01.720
1830 has text dot implications so I get that but but

00:25:01.720 --> 00:25:02.359
hopefully you can get that

00:25:02.359 --> 00:25:07.579
going the other question I got over and over a dozen times

00:25:07.579 --> 00:25:09.240
was how did someone

00:25:09.240 --> 00:25:12.420
start construction before his own and so we're talking here

00:25:12.420 --> 00:25:13.119
about kind of having

00:25:13.119 --> 00:25:15.809
our hands tied which I do get I'm not necessarily opposed

00:25:15.809 --> 00:25:16.640
the inner three

00:25:16.640 --> 00:25:19.529
either but the sequence is like it's a foregone conclusion

00:25:19.529 --> 00:25:20.680
here but moreover to

00:25:20.680 --> 00:25:24.160
the citizens they were highly confused how it's happening

00:25:24.160 --> 00:25:24.799
in our city that

00:25:24.799 --> 00:25:28.250
construction started before a zoning happened so I had a

00:25:28.250 --> 00:25:29.960
lot of questions say

00:25:29.960 --> 00:25:32.430
hey why are you just not doing zoning if it's already been

00:25:32.430 --> 00:25:33.279
approved and then my

00:25:33.279 --> 00:25:36.460
narrative back to them was equally confusing to say well it

00:25:36.460 --> 00:25:37.279
's it's already

00:25:37.279 --> 00:25:40.650
kind of predetermined that they will get a and so I didn't

00:25:40.650 --> 00:25:41.920
feel too confident in

00:25:41.920 --> 00:25:45.849
my response yeah so I kind of echo Commissioner Ellis's

00:25:45.849 --> 00:25:46.599
point that we

00:25:46.599 --> 00:25:50.400
should maybe not look to do these it seems rare but if we

00:25:50.400 --> 00:25:51.839
do maybe look to

00:25:51.839 --> 00:25:55.079
have special messaging or something because there's just a

00:25:55.079 --> 00:25:56.039
lot of confusion

00:25:56.039 --> 00:25:59.299
of how they could have excavators on property and then get

00:25:59.299 --> 00:25:59.880
a zoning

00:25:59.880 --> 00:26:02.769
notification you know three weeks later so that's just my

00:26:02.769 --> 00:26:03.799
two cents on that I

00:26:03.799 --> 00:26:06.430
can understand that and to my the best of my knowledge all

00:26:06.430 --> 00:26:07.319
they've got so far

00:26:07.319 --> 00:26:10.680
is a grading permit when that when a plot is improved

00:26:10.680 --> 00:26:11.680
approved they can they

00:26:11.680 --> 00:26:15.079
can grade the land sure and that's what they're working on

00:26:15.079 --> 00:26:16.279
right now

00:26:16.279 --> 00:26:20.210
Chris or back thank you sure one last question did we do a

00:26:20.210 --> 00:26:20.599
neighborhood

00:26:20.599 --> 00:26:24.210
meeting either for this or when they were doing that when

00:26:24.210 --> 00:26:25.359
the pre annexation

00:26:25.359 --> 00:26:30.789
development agreement was was going through the process the

00:26:30.789 --> 00:26:32.440
developer and

00:26:32.440 --> 00:26:36.579
and neighbors did meet the neighbors have actually

00:26:36.579 --> 00:26:38.079
contacted me and told me

00:26:38.079 --> 00:26:42.009
well they said this this and this so yeah there were aware

00:26:42.009 --> 00:26:42.440
of it so they

00:26:42.440 --> 00:26:48.519
didn't make an attempt to yes okay there is one other point

00:26:48.519 --> 00:26:49.200
I think that could be

00:26:49.200 --> 00:26:52.430
made that that might make it feel a little bit less like a

00:26:52.430 --> 00:26:53.200
hands-tieing

00:26:53.200 --> 00:26:56.099
situation is that if they are outside the city limits we

00:26:56.099 --> 00:26:57.319
have no zoning control

00:26:57.319 --> 00:27:02.910
of them at all period you know absent some kind of a

00:27:02.910 --> 00:27:04.279
development agreement and

00:27:04.279 --> 00:27:08.839
and so they can develop without any kind of annexation

00:27:08.839 --> 00:27:10.200
restrictions that are not

00:27:10.200 --> 00:27:14.000
placed on them by an agreement at least they had some

00:27:14.000 --> 00:27:15.279
restrictions that were

00:27:15.279 --> 00:27:19.500
placed on them that they voluntarily agreed to you know it

00:27:19.500 --> 00:27:20.680
's not some other

00:27:20.680 --> 00:27:24.359
use that could be a lot more intense that that's the city

00:27:24.359 --> 00:27:25.920
would be obligated

00:27:25.920 --> 00:27:31.990
to accept as an existing use upon annexation and and so to

00:27:31.990 --> 00:27:33.319
a certain

00:27:33.319 --> 00:27:37.460
extent you know what you're getting here is not so much a

00:27:37.460 --> 00:27:39.279
hand tying as it is the

00:27:39.279 --> 00:27:43.920
ability to plan and to provide for orderly growth and and

00:27:43.920 --> 00:27:45.319
the city had this

00:27:45.319 --> 00:27:50.920
opportunity presented to them when this pattern was brought

00:27:50.920 --> 00:27:53.720
forward that look

00:27:53.720 --> 00:27:56.990
this is this is what's proposed at least we're putting some

00:27:56.990 --> 00:27:58.319
restrictions in place

00:27:58.319 --> 00:28:01.940
on this that gives the neighboring properties some comfort

00:28:01.940 --> 00:28:03.839
some assurance of

00:28:03.839 --> 00:28:07.589
what's going to go in and how it's going to go in and that

00:28:07.589 --> 00:28:09.000
it's not going to be

00:28:09.000 --> 00:28:14.950
beyond that and and so to a certain extent it does provide

00:28:14.950 --> 00:28:16.279
some order you

00:28:16.279 --> 00:28:19.799
know in the process that you would not otherwise have

00:28:19.799 --> 00:28:22.359
absent an annexation

00:28:22.359 --> 00:28:29.309
development agreement. One point to Larry's comment and I

00:28:29.309 --> 00:28:30.000
believe this was

00:28:30.000 --> 00:28:33.180
done prior to the traffic impact fee ordinance being

00:28:33.180 --> 00:28:34.559
adopted and so that's

00:28:34.559 --> 00:28:37.380
always a challenge right when we're approving final plats

00:28:37.380 --> 00:28:38.319
in the ETJ we don't

00:28:38.319 --> 00:28:41.769
have so even if they are right within the within the you

00:28:41.769 --> 00:28:42.759
know surrounded by

00:28:42.759 --> 00:28:45.640
it by the city we can't necessarily assess that traffic

00:28:45.640 --> 00:28:47.119
impact fee and so at

00:28:47.119 --> 00:28:50.089
least with this agreement while they are providing it you

00:28:50.089 --> 00:28:51.200
know creating an impact

00:28:51.200 --> 00:28:54.920
we were able to actually secure almost double than what

00:28:54.920 --> 00:28:56.279
what the impact fee

00:28:56.279 --> 00:29:00.519
would have required. Okay that makes sense if I may okay

00:29:00.519 --> 00:29:01.799
and again to Larry's

00:29:01.799 --> 00:29:07.450
statement yeah I can see the benefit of that that but how

00:29:07.450 --> 00:29:09.519
often when we do annex

00:29:09.519 --> 00:29:12.730
property there usually nothing on it is that correct have

00:29:12.730 --> 00:29:14.079
we how often have we

00:29:14.079 --> 00:29:19.500
annex property where there's already a development in there

00:29:19.500 --> 00:29:23.440
? It varies even

00:29:23.440 --> 00:29:27.630
there's been some properties of the annex a long long time

00:29:27.630 --> 00:29:29.519
ago with with uses on

00:29:29.519 --> 00:29:33.039
them that are non-conforming and so we can tend now with

00:29:33.039 --> 00:29:34.640
you know tracing it

00:29:34.640 --> 00:29:38.079
all the way back so that they're actually able to continue

00:29:38.079 --> 00:29:38.799
that use we

00:29:38.799 --> 00:29:44.230
had one today in fact but but it does it does vary

00:29:44.230 --> 00:29:45.440
sometimes they're as simple as

00:29:45.440 --> 00:29:48.319
a single-family home. But it seems like the developer here

00:29:48.319 --> 00:29:49.119
at least was

00:29:49.119 --> 00:29:53.200
attempting to work with the city's 2030 plan you know the

00:29:53.200 --> 00:29:54.240
future land use and

00:29:54.240 --> 00:29:57.480
all that with the NR3. Correct and it wasn't like you know

00:29:57.480 --> 00:29:58.079
it wasn't a grab

00:29:58.079 --> 00:30:02.839
for NR4 NR6 which we see a lot so there is you know we

00:30:02.839 --> 00:30:04.480
actually look at it is

00:30:04.480 --> 00:30:07.460
compatible with with that area and serves as a buffer to

00:30:07.460 --> 00:30:08.160
the to the NR4

00:30:08.160 --> 00:30:12.630
and NR6 just to the east. And I wanted to add that we did

00:30:12.630 --> 00:30:14.240
annex some property in

00:30:14.240 --> 00:30:17.730
2010 when we did the big annexation in 2010 that was

00:30:17.730 --> 00:30:19.559
developed the one that I'm

00:30:19.559 --> 00:30:22.029
thinking in particular is off of Mosh Branch it was an

00:30:22.029 --> 00:30:24.559
industrial park and what

00:30:24.559 --> 00:30:28.299
they we had them do is provide us with an inventory of all

00:30:28.299 --> 00:30:29.440
the uses that were

00:30:29.440 --> 00:30:33.049
in that industrial park because the code states that when

00:30:33.049 --> 00:30:34.519
we have we annex uses

00:30:34.519 --> 00:30:38.039
they are non-conforming however they are allowed to

00:30:38.039 --> 00:30:40.000
continue with them so that

00:30:40.000 --> 00:30:42.960
way every time we got a CEO for that industrial park we had

00:30:42.960 --> 00:30:43.759
pull out that

00:30:43.759 --> 00:30:46.940
list and see okay yeah that that's on that list that you so

00:30:46.940 --> 00:30:48.200
they can go in

00:30:48.200 --> 00:30:58.720
there. Krishnapurna did you have a question? No. Okay.

00:30:58.720 --> 00:31:00.400
Thank you very much Cindy.

00:31:00.400 --> 00:31:10.000
Sure. That moves us to item 3C the AESA 16-3 and I'll call

00:31:10.000 --> 00:31:11.279
Haley to provide us

00:31:11.279 --> 00:31:14.279
some information on this one.

00:31:18.799 --> 00:31:22.059
All right good evening before I dive into this I wanted to

00:31:22.059 --> 00:31:24.640
point out a couple

00:31:24.640 --> 00:31:27.230
of things I left on the table some additional responses

00:31:27.230 --> 00:31:28.160
that were received

00:31:28.160 --> 00:31:33.380
for this case as well as a more clear ESA map that should

00:31:33.380 --> 00:31:35.319
replace exhibit 5

00:31:35.319 --> 00:31:38.140
that was in your backup that map came contain some errone

00:31:38.140 --> 00:31:39.160
ous data regarding

00:31:39.160 --> 00:31:41.339
the boundary of the developed floodplain so we corrected

00:31:41.339 --> 00:31:42.279
that and provided you a

00:31:42.279 --> 00:31:45.460
hopefully a clearer picture of the various ESA types that

00:31:45.460 --> 00:31:45.980
are on the

00:31:45.980 --> 00:31:49.160
property and just so you also know Deborah Vera will be

00:31:49.160 --> 00:31:50.299
joining me in this

00:31:50.299 --> 00:31:52.759
presentation so we'll kind of tag team and hopefully get

00:31:52.759 --> 00:31:53.319
you the best

00:31:53.319 --> 00:31:58.380
information we can on this case. So the request before you

00:31:58.380 --> 00:31:59.440
is for an alternative

00:31:59.440 --> 00:32:02.680
environmentally sensitive area plan outlined on the map in

00:32:02.680 --> 00:32:03.440
yellow is the

00:32:03.440 --> 00:32:06.299
boundaries of the Country Club Road Estates which is the

00:32:06.299 --> 00:32:07.359
property there was

00:32:07.359 --> 00:32:11.170
a preliminary plat on your consent agenda for this for this

00:32:11.170 --> 00:32:12.920
property it is

00:32:12.920 --> 00:32:16.329
approximately 32 or 35 and a half acres you can see it's

00:32:16.329 --> 00:32:17.359
located on the west

00:32:17.359 --> 00:32:20.539
side of Country Club Road Regency Court is just to the

00:32:20.539 --> 00:32:21.440
north of this for

00:32:21.440 --> 00:32:24.640
reference the particular type of ESA that we'll be

00:32:24.640 --> 00:32:26.359
discussing tonight is the

00:32:26.359 --> 00:32:30.400
undeveloped floodplain ESA and I also wanted to point out

00:32:30.400 --> 00:32:31.319
to you you may

00:32:31.319 --> 00:32:36.910
remember last or yes last year we had new ESA regulations

00:32:36.910 --> 00:32:38.279
approved this

00:32:38.279 --> 00:32:42.990
development and this ESA up in 2016 so it predates those

00:32:42.990 --> 00:32:44.680
new ESA regulations so

00:32:44.680 --> 00:32:48.609
this was examined under the the purview of those original

00:32:48.609 --> 00:32:49.720
or the older ESA

00:32:49.720 --> 00:32:54.259
regulations that were replaced last year. A little bit more

00:32:54.259 --> 00:32:55.160
background on the

00:32:55.160 --> 00:32:58.339
property it's currently zoned in R3 some of you may

00:32:58.339 --> 00:32:59.519
remember a couple of years

00:32:59.519 --> 00:33:04.390
ago an application came in it was approved early in 2017

00:33:04.390 --> 00:33:05.440
for a rezoning on

00:33:05.440 --> 00:33:09.970
this property so prior to 2017 it was a mixture of NR2 and

00:33:09.970 --> 00:33:11.599
NR4 zoning could

00:33:11.599 --> 00:33:15.529
have permitted a maximum of 111 lots at that time so with

00:33:15.529 --> 00:33:16.720
their application in

00:33:16.720 --> 00:33:21.250
2017 they applied to consolidate the zoning all under NR3

00:33:21.250 --> 00:33:21.880
so kind of split

00:33:21.880 --> 00:33:24.750
the difference with the NR4 and NR2 and give a consistent

00:33:24.750 --> 00:33:25.640
density throughout the

00:33:25.640 --> 00:33:29.920
property under NR3 they could develop a maximum of 124 lots

00:33:29.920 --> 00:33:31.160
the preliminary

00:33:31.160 --> 00:33:34.119
plat and the plans that you'll look at tonight show 73 lots

00:33:34.119 --> 00:33:35.200
so they are coming

00:33:35.200 --> 00:33:38.809
in significantly lower in density than what could be

00:33:38.809 --> 00:33:41.640
permitted so now to kind of

00:33:41.640 --> 00:33:46.230
look at the details of this preliminary plat. Commissioner

00:33:46.230 --> 00:33:47.839
Beck. Thank you chair. Go

00:33:47.839 --> 00:33:52.920
back that one if what are what are they giving up from

00:33:52.920 --> 00:33:56.440
going up from 124 to 73

00:33:56.440 --> 00:34:00.960
if they did 124 lots would they still negatively impacted

00:34:00.960 --> 00:34:02.480
that undeveloped

00:34:02.480 --> 00:34:07.789
floodplain? Yes that's due to the location of the flood

00:34:07.789 --> 00:34:08.400
plain kind of in the

00:34:08.400 --> 00:34:10.519
middle of the property it was likely no matter what they

00:34:10.519 --> 00:34:11.320
did they would have

00:34:11.320 --> 00:34:13.960
some impact on that just trying to get roads or lots or

00:34:13.960 --> 00:34:15.199
something in place on

00:34:15.199 --> 00:34:19.199
the property. But wouldn't our aren't there restrictions in

00:34:19.199 --> 00:34:20.000
place that would

00:34:20.000 --> 00:34:24.199
have prevented them from doing that kind of alteration to

00:34:24.199 --> 00:34:26.400
that? Well the the

00:34:26.400 --> 00:34:28.559
reason we're here tonight is to so you all can have a look

00:34:28.559 --> 00:34:29.519
at those alterations

00:34:29.519 --> 00:34:31.150
that they propose because you're correct there are

00:34:31.150 --> 00:34:32.260
limitations on what you can do

00:34:32.260 --> 00:34:35.440
within an ESA. Okay so they could have done 124 but they

00:34:35.440 --> 00:34:35.920
would have altered

00:34:35.920 --> 00:34:39.860
more significantly the undeveloped floodplain so by doing

00:34:39.860 --> 00:34:43.119
73. That is

00:34:43.119 --> 00:34:44.889
potential I haven't seen what the plan would have looked

00:34:44.889 --> 00:34:45.880
like with that maximum

00:34:45.880 --> 00:34:48.510
number of lots but since they came in for this their plan

00:34:48.510 --> 00:34:49.440
has always been to

00:34:49.440 --> 00:34:52.969
develop somewhere between 73 78 lots to have a larger lot

00:34:52.969 --> 00:34:53.840
more estate style

00:34:53.840 --> 00:35:00.699
development. Thanks. So looking at some of the details here

00:35:00.699 --> 00:35:01.199
you can see two

00:35:01.199 --> 00:35:04.380
phases of development so as I mentioned earlier there's

00:35:04.380 --> 00:35:05.599
still some uncertainty

00:35:05.599 --> 00:35:08.150
as to what the ultimate right-of-way will be for Country

00:35:08.150 --> 00:35:08.880
Club Road when

00:35:08.880 --> 00:35:11.670
TxDOT widens that so phase two is it's kind of a distant

00:35:11.670 --> 00:35:12.679
future maybe in a

00:35:12.679 --> 00:35:15.650
couple of years once TxDOT has those plans finalized but

00:35:15.650 --> 00:35:16.440
this is this is their

00:35:16.440 --> 00:35:19.750
hope for what that would look like and then phase one will

00:35:19.750 --> 00:35:20.480
be the more more

00:35:20.480 --> 00:35:23.659
immediately pending development once they get through this

00:35:23.659 --> 00:35:24.920
process and then

00:35:24.920 --> 00:35:27.679
assuming this is approved final platting and construction

00:35:27.679 --> 00:35:29.639
plans would follow. So

00:35:29.639 --> 00:35:32.460
we do have a few key things to point out Meadowlands Drive

00:35:32.460 --> 00:35:33.519
will extend from the

00:35:33.519 --> 00:35:36.340
existing stub out here on the east side of the property it

00:35:36.340 --> 00:35:37.159
will come into a

00:35:37.159 --> 00:35:39.619
cul-de-sac so there's no direct connectivity where someone

00:35:39.619 --> 00:35:40.119
can make just

00:35:40.119 --> 00:35:42.590
a straight shot through the subdivision. There would be

00:35:42.590 --> 00:35:43.500
several turns involved on

00:35:43.500 --> 00:35:46.719
these streets to get out to Country Club Road so that could

00:35:46.719 --> 00:35:47.440
hopefully you know

00:35:47.440 --> 00:35:50.400
slow down traffic and cause a slower pace to travel through

00:35:50.400 --> 00:35:51.360
the neighborhood.

00:35:51.360 --> 00:35:55.150
As I mentioned it is a total of 73 lots there are a couple

00:35:55.150 --> 00:35:56.159
of gas wells in

00:35:56.159 --> 00:35:59.739
proximity to this so you can see in hatched lines here and

00:35:59.739 --> 00:36:00.800
then with these

00:36:00.800 --> 00:36:03.409
boundary lines the lots that fall within a thousand feet of

00:36:03.409 --> 00:36:04.079
that so they've

00:36:04.079 --> 00:36:06.739
followed all of our regulations for property owner

00:36:06.739 --> 00:36:08.519
notifications there and

00:36:08.519 --> 00:36:11.469
then you can see through the middle of the lot two lots

00:36:11.469 --> 00:36:12.800
called out as a 1x and

00:36:12.800 --> 00:36:16.139
2x and that's the lots that would contain the floodplain

00:36:16.139 --> 00:36:17.719
and the ESA if

00:36:17.719 --> 00:36:22.460
this plan is approved. And at this point I'm gonna let

00:36:22.460 --> 00:36:24.400
Deborah kind of take over

00:36:24.400 --> 00:36:26.460
and walk you through the various types of ESA on the

00:36:26.460 --> 00:36:27.559
property and what the plan

00:36:27.559 --> 00:36:29.719
is.

00:36:30.800 --> 00:36:37.309
Thank you. Okay so they're not gonna do phase one or phase

00:36:37.309 --> 00:36:38.679
two for

00:36:38.679 --> 00:36:41.769
maybe another year or two. It's all possible it's depending

00:36:41.769 --> 00:36:42.239
on what text

00:36:42.239 --> 00:36:44.199
dots timing is on their plans. But they will go ahead and

00:36:44.199 --> 00:36:45.559
do the road completion as

00:36:45.559 --> 00:36:48.159
they're doing phase one. My understanding is they'd likely

00:36:48.159 --> 00:36:49.420
have a temporary access

00:36:49.420 --> 00:36:53.119
point here where that existing driveway is and then yeah

00:36:53.119 --> 00:36:54.159
this would be built

00:36:54.159 --> 00:36:59.199
later on once text dot sponsor finalized. Okay.

00:37:02.679 --> 00:37:04.500
Good evening Commission my name is Deborah Vieira I'm with

00:37:04.500 --> 00:37:06.000
Environmental

00:37:06.000 --> 00:37:08.010
Services and I'm going to walk you through the

00:37:08.010 --> 00:37:09.239
environmental sensitive

00:37:09.239 --> 00:37:13.880
areas component of it. On the screen we have a map that's

00:37:13.880 --> 00:37:16.039
showing the existing

00:37:16.039 --> 00:37:20.329
environmental sensitive area on site. I believe we have new

00:37:20.329 --> 00:37:21.400
members on the

00:37:21.400 --> 00:37:23.320
Commission so I'm going to walk them through what

00:37:23.320 --> 00:37:24.280
environmental sensitive

00:37:24.280 --> 00:37:27.170
areas are. So bear with me the rest of the Commission that

00:37:27.170 --> 00:37:27.820
you have got this

00:37:27.820 --> 00:37:31.440
training so many times. The city of Denton provides

00:37:31.440 --> 00:37:33.119
protection to four types

00:37:33.119 --> 00:37:36.760
of habitats. One of them being the floodplain, repair and

00:37:36.760 --> 00:37:38.000
buffers, water

00:37:38.000 --> 00:37:42.159
related habitats and cross timber open habitats. Those are

00:37:42.159 --> 00:37:43.360
habitats that

00:37:43.360 --> 00:37:47.119
we provide protections to it and require additional

00:37:47.119 --> 00:37:49.280
regulations when development

00:37:49.280 --> 00:37:53.840
comes in that has some some of that into their property.

00:37:53.840 --> 00:37:55.760
Tonight we're going

00:37:55.760 --> 00:37:58.969
to deal with undeveloped floodplain. An undeveloped flood

00:37:58.969 --> 00:38:00.840
plain pretty much is the

00:38:00.840 --> 00:38:05.269
boundaries are determined by what the FEMA determines to be

00:38:05.269 --> 00:38:06.960
the zone that have

00:38:06.960 --> 00:38:10.199
one percent chance of flood every year. It's also called

00:38:10.199 --> 00:38:11.199
the hundred year

00:38:11.199 --> 00:38:14.780
floodplain. So the two the two boundaries overlap they're

00:38:14.780 --> 00:38:16.639
the same. Even though FEMA

00:38:16.639 --> 00:38:19.820
the emphasis of FEMA protections is on the conveyance of

00:38:19.820 --> 00:38:20.960
water is making sure

00:38:20.960 --> 00:38:26.639
that the water is draining properly and that does not

00:38:26.639 --> 00:38:28.880
result in further flooding

00:38:28.880 --> 00:38:33.639
and hazard and damages to the property. The ESA floodplain

00:38:33.639 --> 00:38:34.920
deals more with the

00:38:34.920 --> 00:38:38.449
habitat that it has and the protection service the

00:38:38.449 --> 00:38:40.400
ecological services that

00:38:40.400 --> 00:38:44.849
they provide. So tonight we are going to deal mainly with

00:38:44.849 --> 00:38:45.920
the southern part of

00:38:45.920 --> 00:38:48.630
the property which is determined to be undeveloped flood

00:38:48.630 --> 00:38:50.239
plain. This is a point of

00:38:50.239 --> 00:38:54.170
clarification. The applicant have proposed all the impacts

00:38:54.170 --> 00:38:54.719
to be done

00:38:54.719 --> 00:38:57.949
along the flood fringes which is the outer edges of the

00:38:57.949 --> 00:38:59.519
floodplain and not to

00:38:59.519 --> 00:39:02.699
encroach into the repair and buffer which is the yellow

00:39:02.699 --> 00:39:04.480
area shown. So that's

00:39:04.480 --> 00:39:07.659
why we are not dealing with the repair and buffer at this

00:39:07.659 --> 00:39:09.159
point. The northern

00:39:09.159 --> 00:39:12.840
part of it it was determined through a field assessment

00:39:12.840 --> 00:39:15.000
done in 2015 that that

00:39:15.000 --> 00:39:19.639
area in purple seems to have characteristics of a developed

00:39:19.639 --> 00:39:20.079
floodplain

00:39:20.079 --> 00:39:23.349
meaning that that area have been heavily impacted that have

00:39:23.349 --> 00:39:24.400
been graded that have

00:39:24.400 --> 00:39:27.349
been filled and so on and there's and doesn't provide the

00:39:27.349 --> 00:39:28.440
habitat and the

00:39:28.440 --> 00:39:32.969
benefits that otherwise an undeveloped floodplain does. The

00:39:32.969 --> 00:39:33.719
same happened with

00:39:33.719 --> 00:39:37.360
the repair and buffer that area have been heavily graded. I

00:39:37.360 --> 00:39:38.960
suspect that that

00:39:38.960 --> 00:39:43.019
came as a part of the CLOMAR-LOHMAR process. CLOMAR stands

00:39:43.019 --> 00:39:43.800
for conditional

00:39:43.800 --> 00:39:46.639
letter of map revision. LOHMAR stands for letter of map

00:39:46.639 --> 00:39:48.199
revision. Then it was done

00:39:48.199 --> 00:39:51.380
as a part of Regency Oaks subdivision which is located on

00:39:51.380 --> 00:39:53.360
the north. Also here

00:39:53.360 --> 00:39:57.760
there is a long driveway that connects to Country Club.

00:39:57.760 --> 00:39:58.880
There is a culvert in

00:39:58.880 --> 00:40:05.119
that area to that provides the drainage in that area.

00:40:05.119 --> 00:40:06.719
Somebody have to put a

00:40:06.719 --> 00:40:12.139
culvert in and that and I suspect that some of the field

00:40:12.139 --> 00:40:13.280
and grading that was

00:40:13.280 --> 00:40:15.900
done in the past was also for the for the construction of

00:40:15.900 --> 00:40:16.900
that driveway. So

00:40:16.900 --> 00:40:21.179
there are multiple reasons why that area have been impacted

00:40:21.179 --> 00:40:25.280
in the past. So in

00:40:25.280 --> 00:40:28.710
2015 the staff did a field assessment to determine the

00:40:28.710 --> 00:40:30.760
condition of the floodplain

00:40:30.760 --> 00:40:34.340
and the repair and buffer. The northern part of the

00:40:34.340 --> 00:40:36.559
existing subdivision it was

00:40:36.559 --> 00:40:41.780
found that it was heavily impacted and graded. We are

00:40:41.780 --> 00:40:44.400
suspecting it was the

00:40:44.400 --> 00:40:48.590
result of the letter of map revisions for Regency Oaks that

00:40:48.590 --> 00:40:50.360
was done in 1999.

00:40:50.360 --> 00:40:56.039
Just to for your information, Regency Oaks came before the

00:40:56.039 --> 00:40:56.480
Denton

00:40:56.480 --> 00:41:00.559
Development Code was in place or any of the subchapter 17

00:41:00.559 --> 00:41:01.320
that provides

00:41:01.320 --> 00:41:04.639
protections to environmentally sensitive areas. Even though

00:41:04.639 --> 00:41:06.119
they did very similar

00:41:06.119 --> 00:41:09.309
to what this development is requesting to do tonight, they

00:41:09.309 --> 00:41:10.199
were not subject to

00:41:10.199 --> 00:41:15.059
the protection of the ESA at the time. On the repair and

00:41:15.059 --> 00:41:17.360
buffer pretty much one

00:41:17.360 --> 00:41:21.960
third of the of the repair and buffer the northern set have

00:41:21.960 --> 00:41:22.920
been heavily

00:41:22.920 --> 00:41:28.349
modified. There's not a defined channel anymore. It is more

00:41:28.349 --> 00:41:29.159
like a series of

00:41:29.159 --> 00:41:34.750
pools and that area is also been mowed, vegetated but have

00:41:34.750 --> 00:41:35.760
been mowed. So you

00:41:35.760 --> 00:41:39.690
don't have that typical repair and buffer. We also assess

00:41:39.690 --> 00:41:40.679
the vegetation

00:41:40.679 --> 00:41:44.920
present and they were not wetland related vegetation

00:41:44.920 --> 00:41:45.880
present either. It was

00:41:45.880 --> 00:41:51.880
more upland in character. The downstream two-thirds of the

00:41:51.880 --> 00:41:54.119
site it looks like I

00:41:54.119 --> 00:41:57.909
have not been touched and I will retain the characteristic

00:41:57.909 --> 00:41:58.840
of a more natural

00:41:58.840 --> 00:42:04.269
area and we maintain the repair and buffer designation for

00:42:04.269 --> 00:42:05.480
that segment.

00:42:06.039 --> 00:42:10.059
This table summarizes all the disturbances that are going

00:42:10.059 --> 00:42:10.880
to be done

00:42:10.880 --> 00:42:15.280
within the area and I did that just to give you a complete

00:42:15.280 --> 00:42:16.800
picture of it but I

00:42:16.800 --> 00:42:19.980
just wanted to bring to your attention that only the cells

00:42:19.980 --> 00:42:20.800
highlighted in

00:42:20.800 --> 00:42:25.000
yellow triggers an alternative ESA plan. The first the

00:42:25.000 --> 00:42:26.400
repair and buffer

00:42:26.400 --> 00:42:31.820
designation that was removed is no longer an ESA therefore

00:42:31.820 --> 00:42:33.000
a disturb in

00:42:33.000 --> 00:42:36.460
that area will not trigger an alternative ESA plan. The

00:42:36.460 --> 00:42:38.320
repair and buffer the

00:42:38.320 --> 00:42:42.679
applicant have agreed to keep all disturbances outside the

00:42:42.679 --> 00:42:43.280
repair and

00:42:43.280 --> 00:42:46.590
buffer therefore there are there's no encroachment no need

00:42:46.590 --> 00:42:47.679
to include that as

00:42:47.679 --> 00:42:51.059
a part of the alternative ESA plan. The developed flood

00:42:51.059 --> 00:42:52.000
plain there's no

00:42:52.000 --> 00:42:54.949
protection of the habitat when a floodplain have been

00:42:54.949 --> 00:42:55.920
heavily modified

00:42:55.920 --> 00:43:00.320
therefore will not trigger either the alternative ESA plan.

00:43:00.320 --> 00:43:01.800
Only the section

00:43:01.800 --> 00:43:07.760
that deals with the undeveloped floodplain matters for this

00:43:07.760 --> 00:43:10.280
application.

00:43:10.280 --> 00:43:14.239
This is a detail that the applicant provided to show where

00:43:14.239 --> 00:43:15.119
the field is

00:43:15.119 --> 00:43:20.760
going to be placed. The field area is right here okay and

00:43:20.760 --> 00:43:23.840
this is this seems

00:43:23.840 --> 00:43:28.090
to the purpose of this detail is just to show you what a

00:43:28.090 --> 00:43:30.079
crossing of that stream

00:43:30.079 --> 00:43:34.239
looks like. This is the center line of the stream and

00:43:34.239 --> 00:43:35.960
because it's a repair and

00:43:35.960 --> 00:43:40.880
buffer we provide protection 50 feet on both directions for

00:43:40.880 --> 00:43:43.000
a total of 100 feet.

00:43:43.000 --> 00:43:48.420
The applicant has also stated that they will put any fields

00:43:48.420 --> 00:43:50.239
any field outside any

00:43:50.239 --> 00:43:55.079
tree drip line so in case that there were a tree right at

00:43:55.079 --> 00:43:56.800
the edge of the

00:43:56.800 --> 00:44:02.869
repair and buffer they will push the field further out not

00:44:02.869 --> 00:44:05.400
to put any any

00:44:05.400 --> 00:44:09.340
hazard or stress on those trees so they are cognizant of

00:44:09.340 --> 00:44:10.780
the protection of the

00:44:10.780 --> 00:44:14.840
repair and buffer. So this is the area that we are

00:44:14.840 --> 00:44:16.440
considering which happens

00:44:16.440 --> 00:44:22.849
to be the fringes of the floodplain. This is an image of

00:44:22.849 --> 00:44:25.320
what the floodplain looks

00:44:25.320 --> 00:44:30.510
like in dark blue and if the reclamation work is done how

00:44:30.510 --> 00:44:31.800
the floodplain is going

00:44:31.800 --> 00:44:36.409
to looks like and it's pretty much is going to shrink in

00:44:36.409 --> 00:44:38.519
size. I have broken

00:44:38.519 --> 00:44:42.809
down the changes between the existing floodplain and what

00:44:42.809 --> 00:44:44.119
the proposed flood

00:44:44.119 --> 00:44:50.219
plan would be. Again the things that matter for the for the

00:44:50.219 --> 00:44:51.239
alternative ESA

00:44:51.239 --> 00:44:55.269
plan is highlighted in yellow and you see that they are

00:44:55.269 --> 00:44:57.760
going from almost 300,000

00:44:57.760 --> 00:45:02.880
square feet of floodplain 229 okay which is a difference of

00:45:02.880 --> 00:45:03.800
hundred and seventy

00:45:03.800 --> 00:45:08.880
thousand square feet which is a little bit almost 3.9 acres

00:45:08.880 --> 00:45:09.599
that they will be

00:45:09.599 --> 00:45:15.949
able to reclaim and developed as a part of this development

00:45:15.949 --> 00:45:19.639
. The applicants have

00:45:19.639 --> 00:45:24.110
proposed multiple strategies as a mitigation for the for

00:45:24.110 --> 00:45:24.880
the encroachment

00:45:24.880 --> 00:45:29.039
that they are causing within the undeveloped floodplain. We

00:45:29.039 --> 00:45:30.199
have mentioned

00:45:30.199 --> 00:45:32.659
this already a fill material will be placed outside the

00:45:32.659 --> 00:45:33.719
drip lines of existing

00:45:33.719 --> 00:45:37.159
trees along the creek or the boundary of the repair and

00:45:37.159 --> 00:45:39.760
buffer whichever is wider.

00:45:39.760 --> 00:45:43.550
Grading will be concentrated on the northern portion of the

00:45:43.550 --> 00:45:44.280
side where

00:45:44.280 --> 00:45:48.079
there's the repair and buffer designation have already

00:45:48.079 --> 00:45:49.519
removed or where the

00:45:49.519 --> 00:45:52.699
debate of where the floodplain is considered to be

00:45:52.699 --> 00:45:54.159
developed and less and

00:45:54.159 --> 00:45:58.909
having less value from a habitat standpoint. The street

00:45:58.909 --> 00:46:00.039
layout minimizes

00:46:00.039 --> 00:46:02.559
disturbances of the repair and buffer because they are

00:46:02.559 --> 00:46:03.559
putting that street

00:46:03.559 --> 00:46:09.719
along the northern side of the project. They are proposing

00:46:09.719 --> 00:46:11.840
to remove all invasive

00:46:11.840 --> 00:46:15.639
species found in the repair and buffer and floodplain and

00:46:15.639 --> 00:46:16.519
re vegetated with

00:46:16.519 --> 00:46:21.239
native species. They have us secure the services of tree

00:46:21.239 --> 00:46:26.210
Sherport as their consultant to this this work. They are

00:46:26.210 --> 00:46:27.920
instead of putting a

00:46:27.920 --> 00:46:31.110
pilot channel throughout the floodplain they are going to

00:46:31.110 --> 00:46:32.440
actually leave it as an

00:46:32.440 --> 00:46:36.369
earth and channel which allows for the for vegetation to

00:46:36.369 --> 00:46:37.480
grow and be more

00:46:37.480 --> 00:46:44.300
natural and they they use the lower density that they have

00:46:44.300 --> 00:46:46.320
agree on as a way

00:46:46.320 --> 00:46:50.250
for mitigating for additional runoff. Commissioner Beck.

00:46:50.250 --> 00:46:53.320
Thank you chair. Deborah

00:46:53.320 --> 00:46:58.739
would suit our purposes here to ask you or wait later and

00:46:58.739 --> 00:47:00.320
ask the developers

00:47:00.320 --> 00:47:03.539
on their method of removing the invasive species. They

00:47:03.539 --> 00:47:04.960
mentioned the possibility

00:47:04.960 --> 00:47:08.690
of using herbicide should you want to discuss that now or I

00:47:08.690 --> 00:47:10.239
can I can raise

00:47:10.239 --> 00:47:13.059
the question with them at the public hearing so I'm going

00:47:13.059 --> 00:47:14.280
to do my best but

00:47:14.280 --> 00:47:17.059
if you don't get satisfied with my answer I would say

00:47:17.059 --> 00:47:18.119
follow up with the

00:47:18.119 --> 00:47:24.199
applicant. Well Chinese privet is a bit invasive species

00:47:24.199 --> 00:47:25.239
and is very aggressive

00:47:25.239 --> 00:47:29.800
to get rid of them is is hard to do and most of the time is

00:47:29.800 --> 00:47:30.840
done mechanically

00:47:30.840 --> 00:47:35.639
but also they actually go and this is what the applicant is

00:47:35.639 --> 00:47:37.119
contemplating to

00:47:37.119 --> 00:47:40.409
do that if the mechanical removal is not sufficient they

00:47:40.409 --> 00:47:41.679
will actually go and

00:47:41.679 --> 00:47:46.800
paint the the stats of the of the plan with herbicide so in

00:47:46.800 --> 00:47:49.840
that way heals the

00:47:49.840 --> 00:47:53.769
the invasive species and give an opportunity for native to

00:47:53.769 --> 00:47:54.400
actually

00:47:54.400 --> 00:47:59.219
flourish and and take and thrive. I believe your concern is

00:47:59.219 --> 00:48:01.039
the use of herbicides

00:48:01.039 --> 00:48:04.239
there are different type of herbicides that they can use

00:48:04.239 --> 00:48:05.599
the application is

00:48:05.599 --> 00:48:09.880
meant to be on a on the stump of the plan no it's not like

00:48:09.880 --> 00:48:10.840
you are going to

00:48:10.840 --> 00:48:15.000
spray that area that's how the application should be done.

00:48:15.000 --> 00:48:15.719
If you want

00:48:15.719 --> 00:48:19.050
to pick the applicant's brain about what type of herbicides

00:48:19.050 --> 00:48:20.119
or the selections

00:48:20.119 --> 00:48:23.550
of their contemplated I would suggest that you follow up

00:48:23.550 --> 00:48:24.800
with the applicant.

00:48:36.800 --> 00:48:45.190
Well, when you apply with a brush to the stump itself you

00:48:45.190 --> 00:48:47.320
are reducing the chances.

00:48:47.320 --> 00:48:50.840
One concern that I will have watch the weather you know if

00:48:50.840 --> 00:48:52.159
it's raining next

00:48:52.159 --> 00:48:55.409
day don't do it because probably the rain will wash out

00:48:55.409 --> 00:48:56.239
that so there are

00:48:56.239 --> 00:48:59.989
precautions that you can that you can do it or you can take

00:48:59.989 --> 00:49:01.000
to prevent and

00:49:01.000 --> 00:49:04.760
minimize that type of situation. Yes sir.

00:49:04.760 --> 00:49:07.230
Christopher Sanchez. One of the things that you know

00:49:07.230 --> 00:49:10.570
looking at and I guess that's where you would come in make

00:49:10.570 --> 00:49:10.840
sure it's

00:49:10.840 --> 00:49:15.199
it's either soil active or soil inactive because if you put

00:49:15.199 --> 00:49:15.480
a soil

00:49:15.480 --> 00:49:19.530
actives it'll move through the soil as opposed to an in

00:49:19.530 --> 00:49:21.159
active one. Yeah. And that's

00:49:21.159 --> 00:49:24.769
I mean if you put it with a paintbrush it won't go from

00:49:24.769 --> 00:49:26.000
that spot if it's in

00:49:26.000 --> 00:49:33.510
actives it's soil inactive. Yeah so they are a wide variety

00:49:33.510 --> 00:49:35.000
of herbicides out there

00:49:35.000 --> 00:49:38.179
in the market and they are suitable for some specific

00:49:38.179 --> 00:49:39.519
conditions so I'm sure

00:49:39.519 --> 00:49:42.699
that the applicant would be you know the consultant that

00:49:42.699 --> 00:49:43.639
they do this for living

00:49:43.639 --> 00:49:47.159
will hopefully look into it but again staff is always

00:49:47.159 --> 00:49:48.719
available if they ever

00:49:48.719 --> 00:49:56.230
have a question. Any other questions? And at this point I

00:49:56.230 --> 00:49:58.119
will transition to Haley

00:49:58.119 --> 00:50:02.199
for discussion about the opposition.

00:50:07.840 --> 00:50:11.019
All right so to kind of wrap up and conclude the

00:50:11.019 --> 00:50:12.199
presentation here

00:50:12.199 --> 00:50:15.150
notification of this case was sent this alternative ESA

00:50:15.150 --> 00:50:16.239
plans do follow our

00:50:16.239 --> 00:50:19.829
zoning process so we followed all the same notification

00:50:19.829 --> 00:50:20.960
procedures so as

00:50:20.960 --> 00:50:23.510
replaced in the newspaper the applicant posted the required

00:50:23.510 --> 00:50:24.079
signs on the

00:50:24.079 --> 00:50:28.099
property and then we did mail the 200 and 500 foot

00:50:28.099 --> 00:50:30.360
notifications. Prior to this

00:50:30.360 --> 00:50:33.710
meeting I've received one in opposition and two actually I

00:50:33.710 --> 00:50:34.760
believe it may be

00:50:34.760 --> 00:50:38.059
three that were in favor now I got one at the last minute

00:50:38.059 --> 00:50:39.000
and provided it to

00:50:39.000 --> 00:50:42.480
you this evening and the primary concerns that were

00:50:42.480 --> 00:50:43.159
expressed were

00:50:43.159 --> 00:50:46.110
regarding the trees on the property and concerns that

00:50:46.110 --> 00:50:47.639
drainage could be impacted

00:50:47.639 --> 00:50:50.940
in the north the neighborhood to the north. The applicant

00:50:50.940 --> 00:50:51.320
did hold a

00:50:51.320 --> 00:50:53.340
neighborhood meeting and I believe they addressed quite a

00:50:53.340 --> 00:50:54.239
few of those concerns

00:50:54.239 --> 00:50:57.420
at that time they had a lengthy discussion with the

00:50:57.420 --> 00:50:58.519
neighbors about how

00:50:58.519 --> 00:51:00.539
they would be improving drainage conditions hopefully by

00:51:00.539 --> 00:51:01.239
kind of opening

00:51:01.239 --> 00:51:03.360
up the channel in places where it's been really narrowed

00:51:03.360 --> 00:51:04.280
down under that gravel

00:51:04.280 --> 00:51:07.460
driveway as well as alleviating some of their concerns

00:51:07.460 --> 00:51:08.519
about their plan to

00:51:08.519 --> 00:51:14.449
maintain as many trees on the side as possible. So with

00:51:14.449 --> 00:51:17.280
that a staff is

00:51:17.280 --> 00:51:20.079
recommending approval of the requests with four conditions

00:51:20.079 --> 00:51:21.320
the first being

00:51:21.320 --> 00:51:25.320
that disturbance of the ESA not exceed fill in excess of

00:51:25.320 --> 00:51:27.519
190,000 450 square feet

00:51:27.519 --> 00:51:30.469
within the undeveloped floodplain the second being that

00:51:30.469 --> 00:51:31.360
invasive species

00:51:31.360 --> 00:51:34.349
within the ESA area shall be removed as was indicated in

00:51:34.349 --> 00:51:36.039
their plan the third

00:51:36.039 --> 00:51:38.579
being that plants installed as part of the proposed native

00:51:38.579 --> 00:51:39.760
flora revegetation

00:51:39.760 --> 00:51:42.650
be installed and maintained by the current property owner

00:51:42.650 --> 00:51:43.920
or a developer for

00:51:43.920 --> 00:51:46.699
a period of three years following that installation any

00:51:46.699 --> 00:51:47.800
plants that are removed

00:51:47.800 --> 00:51:50.309
destroyed or die within the three-year period would be

00:51:50.309 --> 00:51:51.400
required to be replaced

00:51:51.400 --> 00:51:54.840
by that current property owner and then the fourth be just

00:51:54.840 --> 00:51:55.719
to solidify that no

00:51:55.719 --> 00:52:00.059
encroachment into areas designated as riparian buffer ESA.

00:52:00.059 --> 00:52:01.119
I'd be happy to

00:52:01.119 --> 00:52:03.210
answer any questions or we can have Deborah back up if

00:52:03.210 --> 00:52:04.199
needed to address any

00:52:04.199 --> 00:52:08.440
other concerns. Thank you Chair. Yeah Deborah did have one

00:52:08.440 --> 00:52:09.239
question one

00:52:09.239 --> 00:52:16.400
other question for you. In the applicant's narrative they

00:52:16.400 --> 00:52:17.519
mentioned that it was

00:52:17.519 --> 00:52:23.199
determined on April 2017 that three threatened and

00:52:23.199 --> 00:52:25.119
endangered species could

00:52:25.119 --> 00:52:27.610
be present inside here and I assume they're talking animal

00:52:27.610 --> 00:52:29.039
species? Yes. Okay

00:52:29.039 --> 00:52:33.360
they never did say what those species were and it also says

00:52:33.360 --> 00:52:34.079
upon a field

00:52:34.079 --> 00:52:37.829
investigation by Jones and Ridenhauer they concluded that

00:52:37.829 --> 00:52:39.000
there do not appear

00:52:39.000 --> 00:52:42.179
to be any federally listed threatened or endangered species

00:52:42.179 --> 00:52:43.320
. I was just curious

00:52:43.320 --> 00:52:46.269
they didn't state when that field investigation was done. I

00:52:46.269 --> 00:52:46.920
gave that April

00:52:46.920 --> 00:52:52.519
3rd. Correct and that information comes from the National

00:52:52.519 --> 00:52:53.159
Environmental

00:52:53.159 --> 00:52:57.389
Policy Act which is a federal law that requires any federal

00:52:57.389 --> 00:52:58.599
agency making a

00:52:58.599 --> 00:53:02.409
decision of a project to consider the environmental impacts

00:53:02.409 --> 00:53:03.519
that you will have.

00:53:03.519 --> 00:53:07.559
For for them to do this reclamation work they have to go

00:53:07.559 --> 00:53:09.159
through FEMA and submit

00:53:09.159 --> 00:53:12.340
a conditional letter of matte revision. Okay as a part of

00:53:12.340 --> 00:53:13.280
that that's what that

00:53:13.280 --> 00:53:17.400
tree is triggered and what they do they go to the site.

00:53:17.400 --> 00:53:19.400
Those three species that

00:53:19.400 --> 00:53:23.190
they're mentioned is because they are known to be in within

00:53:23.190 --> 00:53:24.400
this region and

00:53:24.400 --> 00:53:27.849
they have submitted they have contacted the Texas Park and

00:53:27.849 --> 00:53:29.920
Wildlife who pretty

00:53:29.920 --> 00:53:35.510
much oversee that part of information and they did a field

00:53:35.510 --> 00:53:36.079
assessment just to

00:53:36.079 --> 00:53:39.679
I'm sorry a field visit to determine if the habit that was

00:53:39.679 --> 00:53:40.599
present or if the

00:53:40.599 --> 00:53:44.289
species were there or they were nesting in that area and

00:53:44.289 --> 00:53:46.280
they provided that

00:53:46.280 --> 00:53:49.960
information to the Texas Park and Wildlife and they

00:53:49.960 --> 00:53:51.360
determined that that

00:53:51.360 --> 00:53:55.889
was sufficient. So we got a letter documentation from the

00:53:55.889 --> 00:53:56.800
Texas Park and

00:53:56.800 --> 00:53:59.750
Wildlife on that matter. There was a determination of no

00:53:59.750 --> 00:54:00.840
effect. Of no effect

00:54:00.840 --> 00:54:03.599
because they are not present. What just out of curiosity

00:54:03.599 --> 00:54:04.679
what three species are we

00:54:04.679 --> 00:54:11.269
talking about? Possum? No there's a crane one of them. Let

00:54:11.269 --> 00:54:12.760
me see if I can do it that

00:54:12.760 --> 00:54:16.199
research before the public hearing. Okay that's good thank

00:54:16.199 --> 00:54:17.840
you. You're welcome.

00:54:17.840 --> 00:54:23.880
It's talking it's also talking it talks about native floor

00:54:23.880 --> 00:54:25.159
vegetation is it is

00:54:25.159 --> 00:54:28.590
also and then but earlier on when I was reading through

00:54:28.590 --> 00:54:30.079
this information you

00:54:30.079 --> 00:54:32.550
know we're also talking about grasses and herbaceous

00:54:32.550 --> 00:54:33.920
vegetation. Correct. So

00:54:33.920 --> 00:54:37.869
that's also that'll also be under a three-year. Correct.

00:54:37.869 --> 00:54:38.559
Okay I just want to

00:54:38.559 --> 00:54:42.019
Is everything that will be installed. Okay. And as a part

00:54:42.019 --> 00:54:43.639
of the report that they put

00:54:43.639 --> 00:54:47.119
together they included the species that they're going to

00:54:47.119 --> 00:54:48.239
look from from the

00:54:48.239 --> 00:54:53.000
trees and from also the herbaceous material. Right.

00:54:54.280 --> 00:55:02.469
Any other questions? I think we're good. Thank you. Next on

00:55:02.469 --> 00:55:05.599
the agenda is Z 18 - 15

00:55:05.599 --> 00:55:10.199
it's also Haley this is a zoning case.

00:55:19.320 --> 00:55:25.809
Alright so this is case Z 18 - 15 for Audreau Oaks. The

00:55:25.809 --> 00:55:27.199
request before you is a

00:55:27.199 --> 00:55:30.469
rezoning from neighborhood residential 2 to neighborhood

00:55:30.469 --> 00:55:31.599
residential 4 district.

00:55:31.599 --> 00:55:35.099
The subject property again is outlined in yellow on the map

00:55:35.099 --> 00:55:36.440
it is just over 13

00:55:36.440 --> 00:55:39.929
acres and you can see here it is located on the south side

00:55:39.929 --> 00:55:41.579
of the east-west leg of

00:55:41.579 --> 00:55:45.900
Audreau Lane and is located just west of Barbara Street. So

00:55:45.900 --> 00:55:47.599
to look at what this

00:55:47.599 --> 00:55:50.420
rezoning would look like on our map you can see on the left

00:55:50.420 --> 00:55:51.360
the current zoning

00:55:51.360 --> 00:55:56.340
of NR 2 and then on the right the proposed zoning of NR 4.

00:55:56.340 --> 00:55:57.599
The applicant

00:55:57.599 --> 00:56:00.780
did provide a concept plan for your consideration. Due to

00:56:00.780 --> 00:56:01.599
the scale of it I

00:56:01.599 --> 00:56:04.130
couldn't get it to rotate the correct way so north is to

00:56:04.130 --> 00:56:04.880
the left on the

00:56:04.880 --> 00:56:08.670
screen but you can see here Audreau Lane so they would have

00:56:08.670 --> 00:56:10.159
one primary street

00:56:10.159 --> 00:56:12.170
connection through here that would tie into Oak Valley

00:56:12.170 --> 00:56:13.199
Street on the south side

00:56:13.199 --> 00:56:16.750
and then there is a proposed connection to a street that

00:56:16.750 --> 00:56:18.079
would be on the west

00:56:18.079 --> 00:56:21.730
side of the property. If you remember there were a couple

00:56:21.730 --> 00:56:22.639
of rezoning's in

00:56:22.639 --> 00:56:26.150
recent in the past year to NR 6 adjoining this. Those

00:56:26.150 --> 00:56:27.119
subdivisions are in

00:56:27.119 --> 00:56:29.269
the preliminary plotting process at this point so they know

00:56:29.269 --> 00:56:30.000
that that street

00:56:30.000 --> 00:56:33.630
connection would be a viable option for them. And then some

00:56:33.630 --> 00:56:34.800
of the key features

00:56:34.800 --> 00:56:38.849
to look at on this concept plan. The lots that are shown in

00:56:38.849 --> 00:56:40.199
orange here are where

00:56:40.199 --> 00:56:43.460
they would have a detached single-family homes proposed. In

00:56:43.460 --> 00:56:44.159
blue you can see

00:56:44.159 --> 00:56:48.329
areas where they would they've proposed duplexes and then

00:56:48.329 --> 00:56:49.920
this 5.3 acre parcel

00:56:49.920 --> 00:56:52.480
that I've outlined in green is proposed as either a

00:56:52.480 --> 00:56:53.920
dedication to the city in

00:56:53.920 --> 00:56:57.929
the form of a park or as an HOA maintained green space and

00:56:57.929 --> 00:56:58.840
they are in

00:56:58.840 --> 00:57:01.559
communications with our Parks Department to have those

00:57:01.559 --> 00:57:02.239
preliminary

00:57:02.239 --> 00:57:05.840
discussions about whether this would be a viable city park

00:57:05.840 --> 00:57:07.960
option. So as you were

00:57:07.960 --> 00:57:10.920
familiar with by now there are two criteria outlined in the

00:57:10.920 --> 00:57:11.360
DDC for a

00:57:11.360 --> 00:57:14.539
rezoning request. Does it conform to our future land use

00:57:14.539 --> 00:57:15.719
plan within the Denton

00:57:15.719 --> 00:57:19.510
Plan 2030 and is there adequate provision of infrastructure

00:57:19.510 --> 00:57:21.460
? So the

00:57:21.460 --> 00:57:24.099
future land use designation for this area is low

00:57:24.099 --> 00:57:26.320
residential. This designation

00:57:26.320 --> 00:57:29.599
is applied to areas where we intend residential development

00:57:29.599 --> 00:57:30.440
to occur between

00:57:30.440 --> 00:57:33.320
one and four dwelling units per acre. The comp plan does

00:57:33.320 --> 00:57:34.480
encourage a mixture of

00:57:34.480 --> 00:57:37.699
housing types and prices within these areas. It also

00:57:37.699 --> 00:57:38.699
encourages that

00:57:38.699 --> 00:57:41.170
development be consistent and compatible with what's

00:57:41.170 --> 00:57:43.280
surrounding. So in looking at

00:57:43.280 --> 00:57:46.159
this we found the NR4 district is consistent with this. It

00:57:46.159 --> 00:57:46.559
permits a

00:57:46.559 --> 00:57:49.320
maximum of one dwelling unit or I'm sorry that should be

00:57:49.320 --> 00:57:50.480
four dwelling units per

00:57:50.480 --> 00:57:53.769
acre. It permits single-family homes by right and duplexes

00:57:53.769 --> 00:57:54.639
are permitted with

00:57:54.639 --> 00:58:00.500
limitations. So to look at that in a little more depth, NR4

00:58:00.500 --> 00:58:01.840
is kind of

00:58:01.840 --> 00:58:03.940
surrounding the property on a couple of sides. So we have

00:58:03.940 --> 00:58:04.960
NR4 to the south and

00:58:04.960 --> 00:58:09.119
NR4 to the east. There's also NR2, NR6, and NR3 in this

00:58:09.119 --> 00:58:10.000
area. So it's kind of a

00:58:10.000 --> 00:58:14.079
mixed density area. So NR4 is consistent with this existing

00:58:14.079 --> 00:58:14.880
development pattern.

00:58:14.880 --> 00:58:17.349
The single-family use that's permitted by right would be

00:58:17.349 --> 00:58:18.519
directly compatible with

00:58:18.519 --> 00:58:23.159
other uses in the area. Duplexes as I mentioned are limited

00:58:23.159 --> 00:58:23.880
within the zoning

00:58:23.880 --> 00:58:28.630
district. So the code requires that duplexes be on lots

00:58:28.630 --> 00:58:30.079
that do not abut the

00:58:30.079 --> 00:58:32.210
perimeter of the subdivision. So you saw in their concept

00:58:32.210 --> 00:58:33.039
plan they have the park

00:58:33.039 --> 00:58:35.820
on one side, some single-family homes on the south side,

00:58:35.820 --> 00:58:36.840
and then some alleyways

00:58:36.840 --> 00:58:40.019
that would separate this from direct contact with the

00:58:40.019 --> 00:58:40.760
perimeter of the

00:58:40.760 --> 00:58:44.809
subdivision. It also requires that each unit within the du

00:58:44.809 --> 00:58:45.440
plex be on a

00:58:45.440 --> 00:58:48.280
separately platted lot that's designed to be individually

00:58:48.280 --> 00:58:49.840
sold. So as part of

00:58:49.840 --> 00:58:51.849
their preliminary plat they would be required to plait

00:58:51.849 --> 00:58:52.559
those duplexes on

00:58:52.559 --> 00:58:55.860
individual lots so that they could be owned as a

00:58:55.860 --> 00:58:58.039
traditional home. And then the

00:58:58.039 --> 00:59:01.219
limitation also requires compliance with subchapter 13,

00:59:01.219 --> 00:59:02.159
which specifically

00:59:02.159 --> 00:59:05.050
requires that duplexes within the city of Denton look like

00:59:05.050 --> 00:59:06.079
one single-family

00:59:06.079 --> 00:59:09.260
unit from the structures or from the street. So that would

00:59:09.260 --> 00:59:09.599
be, you know, only

00:59:09.599 --> 00:59:12.070
one front door could face the street for example. It would

00:59:12.070 --> 00:59:13.199
have to maintain the

00:59:13.199 --> 00:59:16.679
look and feel of a single-family home. Commissioner Beck.

00:59:16.679 --> 00:59:17.840
Thank you Chair. Let me ask

00:59:17.840 --> 00:59:21.199
something at this point. You've got two dwelling units in

00:59:21.199 --> 00:59:23.920
the duplex. So say one

00:59:23.920 --> 00:59:27.670
side doesn't sell for a while. The appearance of the other

00:59:27.670 --> 00:59:29.000
side, say the lawn,

00:59:29.000 --> 00:59:33.480
gets out of hand. How is that built with in this case? It

00:59:33.480 --> 00:59:34.039
would fall back on

00:59:34.039 --> 00:59:37.320
whoever owns the property at that time. So one side of the

00:59:37.320 --> 00:59:38.119
duplex could sell and

00:59:38.119 --> 00:59:41.300
say the developer or someone else could would still have

00:59:41.300 --> 00:59:42.280
the other half of that

00:59:42.280 --> 00:59:47.710
property and be responsible for it. And looking at the

00:59:47.710 --> 00:59:49.639
other criteria, there is

00:59:49.639 --> 00:59:52.559
infrastructure available to the site. So you can see Audre

00:59:52.559 --> 00:59:53.780
Lane is a collector at

00:59:53.780 --> 00:59:56.500
this point. So there would be access there as well as those

00:59:56.500 --> 00:59:57.000
other points of

00:59:57.000 --> 01:00:00.179
connectivity to the surrounding neighborhoods. Water and

01:00:00.179 --> 01:00:01.079
sewer service

01:00:01.079 --> 01:00:05.550
are also adequately available here to the site. Once again,

01:00:05.550 --> 01:00:06.679
notification was

01:00:06.679 --> 01:00:09.150
given about this case. The applicant did post the required

01:00:09.150 --> 01:00:10.599
signs on the property.

01:00:10.599 --> 01:00:13.210
Notifications were mailed to surrounding property owners

01:00:13.210 --> 01:00:13.840
and there was a

01:00:13.840 --> 01:00:17.469
neighborhood meeting held. So you can see here we did have

01:00:17.469 --> 01:00:18.440
a few responses in

01:00:18.440 --> 01:00:21.719
opposition, one of which was outside that 200-foot buffer.

01:00:21.719 --> 01:00:23.119
Those few additional

01:00:23.119 --> 01:00:25.650
responses were provided to you prior to this meeting. There

01:00:25.650 --> 01:00:26.880
were some responses in

01:00:26.880 --> 01:00:30.070
favor and I did attend the neighborhood meeting and there

01:00:30.070 --> 01:00:30.519
was some

01:00:30.519 --> 01:00:33.699
concern about traffic through the area, particularly on Oak

01:00:33.699 --> 01:00:34.519
Valley going up to

01:00:34.519 --> 01:00:39.239
Audre. But overall it seemed to be a rather positive field.

01:00:39.239 --> 01:00:39.599
The neighbors

01:00:39.599 --> 01:00:42.289
weren't not necessarily opposed to duplexes. They felt it

01:00:42.289 --> 01:00:43.000
was a new use that

01:00:43.000 --> 01:00:46.179
would be introduced to the area. But if those were owned,

01:00:46.179 --> 01:00:46.920
they seemed to be

01:00:46.920 --> 01:00:50.099
generally okay with the idea. Although some did have

01:00:50.099 --> 01:00:50.840
concerns about the

01:00:50.840 --> 01:00:55.940
high density. But with that, staff is recommending approval

01:00:55.940 --> 01:00:56.679
of the request. We

01:00:56.679 --> 01:00:59.139
found it to be consistent with our criteria for approval. I

01:00:59.139 --> 01:01:00.039
'd be happy to

01:01:00.039 --> 01:01:04.840
answer any questions. Thank you Chair. Haley, in the staff

01:01:04.840 --> 01:01:05.880
analysis it was

01:01:05.880 --> 01:01:08.489
mentioned that you had concern over the duplexes. You didn

01:01:08.489 --> 01:01:09.400
't really say what that

01:01:09.400 --> 01:01:12.280
those concerns were or how they were alleviated. So can you

01:01:12.280 --> 01:01:13.079
enlighten me on

01:01:13.079 --> 01:01:15.550
that? Certainly. You know, kind of like some of the

01:01:15.550 --> 01:01:16.480
neighbors, we felt that it

01:01:16.480 --> 01:01:19.920
would be a new use for this particular area. They're always

01:01:19.920 --> 01:01:21.039
as concerned with

01:01:21.039 --> 01:01:23.510
duplexes over it being a rental property. But with the

01:01:23.510 --> 01:01:24.800
limitations that our code

01:01:24.800 --> 01:01:27.980
already imposes on that use, it can be made more compatible

01:01:27.980 --> 01:01:29.000
. They are designed

01:01:29.000 --> 01:01:31.199
to be individually sold and maintained as a single-family

01:01:31.199 --> 01:01:32.079
home. So that would

01:01:32.079 --> 01:01:35.500
help. And then in addition to that, there is on the concept

01:01:35.500 --> 01:01:36.599
plan you can see some

01:01:36.599 --> 01:01:39.469
significant separation between the duplexes and the

01:01:39.469 --> 01:01:40.239
surrounding

01:01:40.239 --> 01:01:43.440
neighborhoods. So you know the park for example would

01:01:43.440 --> 01:01:44.559
greatly separate them

01:01:44.559 --> 01:01:48.309
from those homes to the east. But that was our general

01:01:48.309 --> 01:01:49.679
thought process on this.

01:01:49.679 --> 01:01:52.360
We felt that the limitations that are already in the code

01:01:52.360 --> 01:01:53.639
kind of address the

01:01:53.639 --> 01:01:57.679
concern of this being a new use introduced to the area.

01:01:57.679 --> 01:01:58.559
Commissioner

01:01:58.559 --> 01:02:01.760
Sanchez. Being that they're gonna have a homeowners

01:02:01.760 --> 01:02:03.360
association here, is there

01:02:03.360 --> 01:02:07.889
anything that would, I know a while back I heard where a

01:02:07.889 --> 01:02:08.480
homeowner's

01:02:08.480 --> 01:02:12.800
association had a percentage of that they would allow only

01:02:12.800 --> 01:02:13.760
a percentage of

01:02:13.760 --> 01:02:17.090
those houses to be rentals. Would something like that work?

01:02:17.090 --> 01:02:17.960
Because a lot of

01:02:17.960 --> 01:02:23.389
times those duplexes end up in investment property. But

01:02:23.389 --> 01:02:24.079
being that this

01:02:24.079 --> 01:02:27.519
is a homeowners association associated with these duplexes,

01:02:27.519 --> 01:02:28.360
I mean is there

01:02:28.360 --> 01:02:32.610
anything that I just I guess I was just throwing that out.

01:02:32.610 --> 01:02:33.480
Could the homeowners

01:02:33.480 --> 01:02:39.989
association state a what only a 1% of these duplexes can be

01:02:39.989 --> 01:02:41.119
investments or

01:02:41.119 --> 01:02:43.809
rentals? I believe that's certainly something they could

01:02:43.809 --> 01:02:45.000
willingly impose but

01:02:45.000 --> 01:02:47.550
the city wouldn't be involved in that process. Those would

01:02:47.550 --> 01:02:48.260
be kind of private

01:02:48.260 --> 01:02:50.730
deed restrictions imposed by the developer but but that

01:02:50.730 --> 01:02:51.159
could be an

01:02:51.159 --> 01:02:56.079
option that they could look into. Commissioner Beck. Thank

01:02:56.079 --> 01:02:57.320
you chair. I have

01:02:57.320 --> 01:03:03.130
several concerns here. In regards to Commissioner Sanchez's

01:03:03.130 --> 01:03:05.139
concern about the

01:03:05.139 --> 01:03:11.820
HOA. The HOA is the developers responsibility until the all

01:03:11.820 --> 01:03:12.239
the

01:03:12.239 --> 01:03:14.849
developments done. Is that correct? And then once that's

01:03:14.849 --> 01:03:15.840
done then homeowners

01:03:15.840 --> 01:03:19.199
take it over. I believe there's typically a trigger point

01:03:19.199 --> 01:03:19.599
in there once

01:03:19.599 --> 01:03:22.030
so many homes have been sold that it would transition from

01:03:22.030 --> 01:03:22.679
the developer to

01:03:22.679 --> 01:03:27.519
those homeowners. Okay. One concern I have about the it was

01:03:27.519 --> 01:03:29.840
mentioned that they

01:03:29.840 --> 01:03:34.420
would like to see that green area either taken over by the

01:03:34.420 --> 01:03:35.760
city as a part or

01:03:35.760 --> 01:03:38.480
maintained by a homeowners association and a homeowner

01:03:38.480 --> 01:03:40.480
association with 47

01:03:40.480 --> 01:03:43.800
dwellers units. I don't know your fees that have to be

01:03:43.800 --> 01:03:45.440
pretty high. I would

01:03:45.440 --> 01:03:48.269
think to maintain that as a part so I don't see that as a

01:03:48.269 --> 01:03:49.440
feasible option.

01:03:49.440 --> 01:03:52.909
Would love to see the city take it over but can we afford

01:03:52.909 --> 01:03:54.119
it as in the budget?

01:03:54.119 --> 01:03:57.510
So and I'm kind of throwing this out because I'm hoping the

01:03:57.510 --> 01:03:58.599
applicants in here

01:03:58.599 --> 01:04:02.219
now we can deal with it more detail when you get out in the

01:04:02.219 --> 01:04:03.480
public hearing. We're

01:04:03.480 --> 01:04:06.630
going from we want to go from an NR2 to an NR4 and there's

01:04:06.630 --> 01:04:09.159
NR4 surrounding it.

01:04:09.159 --> 01:04:15.239
The duplexes are a concern. I'm glad they're gonna be owned

01:04:15.239 --> 01:04:16.440
, sold and owned by

01:04:16.440 --> 01:04:19.920
individuals but my feeling and I discussed it with a couple

01:04:19.920 --> 01:04:20.400
commissioners

01:04:20.400 --> 01:04:24.929
earlier is that duplexes tend to have a higher turnover

01:04:24.929 --> 01:04:26.159
into rental property

01:04:26.159 --> 01:04:31.269
than single-family. So I think that concern is there. This

01:04:31.269 --> 01:04:32.039
whole area is

01:04:32.039 --> 01:04:36.809
surrounded by single-family residential dwellings bounded

01:04:36.809 --> 01:04:38.360
by Audra on the north

01:04:38.360 --> 01:04:42.800
and on the west, Mankenburg on the east and then as far

01:04:42.800 --> 01:04:44.880
down as Paisley on the

01:04:44.880 --> 01:04:49.420
south. What's the percentage of duplexes in those areas? Do

01:04:49.420 --> 01:04:51.480
we know? As far as a

01:04:51.480 --> 01:04:54.099
percentage I'm not certain I know. Just down Audra here

01:04:54.099 --> 01:04:55.239
there there is a street

01:04:55.239 --> 01:04:58.750
of duplexes I believe you all have seen a plat recently for

01:04:58.750 --> 01:04:59.960
a continuation of

01:04:59.960 --> 01:05:03.570
that neighborhood with more duplexes intended but you are

01:05:03.570 --> 01:05:04.440
correct that the

01:05:04.440 --> 01:05:07.789
majority of this area is single-family. I will say that the

01:05:07.789 --> 01:05:08.840
density of it if you

01:05:08.840 --> 01:05:11.280
look at it is not necessarily for example the neighborhood

01:05:11.280 --> 01:05:11.760
to the north

01:05:11.760 --> 01:05:14.909
exceeds three and a half dwelling units per acre as we kind

01:05:14.909 --> 01:05:15.760
of discussed with

01:05:15.760 --> 01:05:18.280
some of these cases there's an average of four to five

01:05:18.280 --> 01:05:19.400
units per acre in this

01:05:19.400 --> 01:05:24.199
area. And these duplexes they don't exceed the density

01:05:24.199 --> 01:05:26.000
requirement? No they

01:05:26.000 --> 01:05:29.460
would be within the density for NR4 as proposed. Now I will

01:05:29.460 --> 01:05:30.480
say there there is a

01:05:30.480 --> 01:05:33.769
you know potentially lot coverage issues and parking issues

01:05:33.769 --> 01:05:34.400
that could could

01:05:34.400 --> 01:05:36.590
impact the site design here the concept plan we've seen

01:05:36.590 --> 01:05:37.639
here is certainly not

01:05:37.639 --> 01:05:41.719
set in stone because NR4 does have a 60% lot coverage

01:05:41.719 --> 01:05:43.199
maximum that that may be

01:05:43.199 --> 01:05:46.150
hard to attain on some of these duplex lots as well as the

01:05:46.150 --> 01:05:47.079
required for parking

01:05:47.079 --> 01:05:49.670
spaces so the applicants aware of those challenges and

01:05:49.670 --> 01:05:50.760
still looking at it but

01:05:50.760 --> 01:05:53.230
this is kind of their their ultimate hope if they could

01:05:53.230 --> 01:05:54.039
achieve this number

01:05:54.039 --> 01:05:58.469
of lots. Okay and if you would go back to that site plan

01:05:58.469 --> 01:06:00.239
that shows right there

01:06:00.239 --> 01:06:05.130
okay now at the bottom there it indicates that proposed

01:06:05.130 --> 01:06:06.559
street by others

01:06:06.559 --> 01:06:10.150
I don't know what that means but when you look at the

01:06:10.150 --> 01:06:11.599
concept plan it looks

01:06:11.599 --> 01:06:16.710
like there is no street you can go into there so there's

01:06:16.710 --> 01:06:18.599
not at this time if

01:06:18.599 --> 01:06:21.409
there's a house actually there though isn't there? That so

01:06:21.409 --> 01:06:22.280
that the

01:06:22.280 --> 01:06:24.820
orientation of the concept plan had north to the left side

01:06:24.820 --> 01:06:25.920
of the screen so

01:06:25.920 --> 01:06:28.440
that would be this side the proposed street that it showed

01:06:28.440 --> 01:06:29.440
by others would be

01:06:29.440 --> 01:06:39.679
in this general area. Okay where does the east westbound

01:06:39.679 --> 01:06:40.880
proposed street in the

01:06:40.880 --> 01:06:43.639
conception plan leak up to the street in the adjoining

01:06:43.639 --> 01:06:44.920
subdivision then will it

01:06:44.920 --> 01:06:52.429
can you show us that? That proposed street. Correct I

01:06:52.429 --> 01:06:53.760
believe it would roughly align

01:06:53.760 --> 01:06:55.960
with this street like I said this this subdivision that was

01:06:55.960 --> 01:06:56.800
rezoned last year

01:06:56.800 --> 01:06:59.269
they do have a preliminary plot in and I believe there they

01:06:59.269 --> 01:07:00.119
would be continuing

01:07:00.119 --> 01:07:02.590
this roadway across. Okay but it wouldn't connect to the

01:07:02.590 --> 01:07:04.119
subdivision on the east.

01:07:04.119 --> 01:07:08.460
No the park would would kind of end the street in this area

01:07:08.460 --> 01:07:10.039
. Okay and then the

01:07:10.039 --> 01:07:12.500
only other thing I was concerned about was the idea that

01:07:12.500 --> 01:07:13.199
that green area is

01:07:13.199 --> 01:07:19.289
just with 47 residents is there an HOA fee to maintain that

01:07:19.289 --> 01:07:20.480
would be too high

01:07:20.480 --> 01:07:24.800
so the feasibility of that it's kind of out of the question

01:07:24.800 --> 01:07:26.159
for me and I would

01:07:26.159 --> 01:07:29.960
again I would be supportive of the city because that area

01:07:29.960 --> 01:07:30.920
could use a little

01:07:30.920 --> 01:07:33.699
park area over there. So yeah it is on the Parks Department

01:07:33.699 --> 01:07:34.820
's radar they've the

01:07:34.820 --> 01:07:37.329
applicants had that discussion with them I called parks a

01:07:37.329 --> 01:07:38.199
few days ago just to

01:07:38.199 --> 01:07:39.809
ask where they're at and they said it is something that

01:07:39.809 --> 01:07:40.840
they're considering but

01:07:40.840 --> 01:07:43.300
they're kind of weighing some options for this area of town

01:07:43.300 --> 01:07:43.920
right now. Okay

01:07:43.920 --> 01:07:48.119
okay thank you. Commissioner Ellis. Thank you chair so my

01:07:48.119 --> 01:07:51.559
concern is knowing this is a zoning change and that's a

01:07:51.559 --> 01:07:53.280
concept plan there's

01:07:53.280 --> 01:07:56.170
really no guarantee that the park space would be there so

01:07:56.170 --> 01:07:57.440
if this development

01:07:57.440 --> 01:08:01.440
doesn't happen we've got this whole area's NR4 it would

01:08:01.440 --> 01:08:02.039
certainly could

01:08:02.039 --> 01:08:04.639
develop differently right because we didn't put any kind of

01:08:04.639 --> 01:08:05.440
restriction that

01:08:05.440 --> 01:08:08.920
has to be a park. It could I will say there are some

01:08:08.920 --> 01:08:09.800
challenges with that side

01:08:09.800 --> 01:08:12.260
of the property I think the applicant will probably have

01:08:12.260 --> 01:08:12.960
some diagrams that

01:08:12.960 --> 01:08:16.140
can speak to it a little bit better but the hatched area

01:08:16.140 --> 01:08:17.239
here is a natural gas

01:08:17.239 --> 01:08:20.460
pipeline that they wouldn't be able to develop on top of

01:08:20.460 --> 01:08:21.279
there is also

01:08:21.279 --> 01:08:24.640
somewhere in this general area running north-south a siz

01:08:24.640 --> 01:08:26.079
able drainage easement

01:08:26.079 --> 01:08:28.970
that was put in place when the subdivision to the south

01:08:28.970 --> 01:08:30.199
developed so

01:08:30.199 --> 01:08:33.060
there would be very limited space on that side of the

01:08:33.060 --> 01:08:34.399
property that could be

01:08:34.399 --> 01:08:38.119
developed with residences regardless of the zoning on the

01:08:38.119 --> 01:08:38.960
property because of

01:08:38.960 --> 01:08:44.600
those easements. So there's no guarantee we could put in

01:08:44.600 --> 01:08:46.560
that it could must be a

01:08:46.560 --> 01:08:52.149
green space with whoever does it. You could probably you

01:08:52.149 --> 01:08:53.199
know I will defer to

01:08:53.199 --> 01:08:55.659
Jerry on whether that could be a condition of the zoning

01:08:55.659 --> 01:08:56.100
that that be a

01:08:56.100 --> 01:08:58.569
green space but I would say it's unlikely it would be

01:08:58.569 --> 01:08:59.279
anything else

01:08:59.279 --> 01:09:03.319
because of those easements that are there. Stranger things

01:09:03.319 --> 01:09:04.439
have happened so

01:09:04.439 --> 01:09:12.239
that's my concern. The only question I have is this is

01:09:12.239 --> 01:09:13.439
strictly a zoning case

01:09:13.439 --> 01:09:15.909
the concept plan was just given for our identification of

01:09:15.909 --> 01:09:17.279
what they think where

01:09:17.279 --> 01:09:20.569
to look at more if it's good for the neighborhood for it to

01:09:20.569 --> 01:09:22.199
be an NR4 full

01:09:22.199 --> 01:09:25.920
stop correct apart from what they're presenting here to

01:09:25.920 --> 01:09:26.479
Commissioner Ellsons

01:09:26.479 --> 01:09:29.659
point this entire block we need to look at is it good for

01:09:29.659 --> 01:09:31.560
to be an NR4 they

01:09:31.560 --> 01:09:36.439
might not develop duplexes that's yet to be seen correct

01:09:36.439 --> 01:09:38.000
correct yeah if NR4 were

01:09:38.000 --> 01:09:40.649
approved you know anything permitted within NR4 could go

01:09:40.649 --> 01:09:41.560
there the primary

01:09:41.560 --> 01:09:43.729
uses that would be permitted would be single-family or du

01:09:43.729 --> 01:09:44.439
plexes with that

01:09:44.439 --> 01:09:47.619
limitation. There's no more intensive housing type that

01:09:47.619 --> 01:09:48.079
could be developed

01:09:48.079 --> 01:09:55.739
under NR4. Any other questions for Haley? Thanks Haley. We

01:09:55.739 --> 01:09:56.439
'll go ahead and

01:09:56.439 --> 01:10:00.970
take a five-minute break to get some food and be back and

01:10:00.970 --> 01:10:02.239
get a presentation

01:10:02.239 --> 01:10:05.159
on project types.

01:10:16.439 --> 01:10:20.010
And we are back at 621 in the work session for planning and

01:10:20.010 --> 01:10:21.800
zoning I'll

01:10:21.800 --> 01:10:25.729
invite Julie Wyatt for presentation. Julie if you could in

01:10:25.729 --> 01:10:26.560
the next nine

01:10:26.560 --> 01:10:30.489
minutes or so it's give us an overview of this boot camp it

01:10:30.489 --> 01:10:33.000
looks like. Then we

01:10:33.000 --> 01:10:35.460
might table to the next meeting but let's kick it off now

01:10:35.460 --> 01:10:36.039
and get started.

01:10:36.039 --> 01:10:39.220
All right my name is Julie Wyatt I'm a senior planner with

01:10:39.220 --> 01:10:40.279
the City of Denton.

01:10:40.279 --> 01:10:44.750
Tonight I was tasked to talk to you about project types in

01:10:44.750 --> 01:10:46.079
the approval body

01:10:46.079 --> 01:10:50.630
and and those processes of project types. We have some new

01:10:50.630 --> 01:10:51.760
P&Z Commissioners so

01:10:51.760 --> 01:10:54.520
we thought this might be a really good opportunity to to

01:10:54.520 --> 01:10:55.479
maybe take a take a

01:10:55.479 --> 01:11:00.399
step back and start a broader conversation regarding some

01:11:00.399 --> 01:11:00.760
planning

01:11:00.760 --> 01:11:04.079
topics how those relate to the City of Denton some some

01:11:04.079 --> 01:11:05.439
planning efforts that

01:11:05.439 --> 01:11:07.640
going that are going on with the City of Denton. So so

01:11:07.640 --> 01:11:09.600
tonight's the first step

01:11:09.600 --> 01:11:15.430
and and and so so we'll get started. Tonight we're just

01:11:15.430 --> 01:11:16.920
gonna bite off a

01:11:16.920 --> 01:11:19.510
little bit of the piece and that is the project types and

01:11:19.510 --> 01:11:20.479
the approving body.

01:11:20.479 --> 01:11:23.800
We're also going to talk about public hearing requirements

01:11:23.800 --> 01:11:25.399
just broadly and

01:11:25.399 --> 01:11:28.699
then if we probably won't have time we can we can fold this

01:11:28.699 --> 01:11:29.600
in at the next

01:11:29.600 --> 01:11:33.720
meeting land development development review process and

01:11:33.720 --> 01:11:34.640
then the development

01:11:34.640 --> 01:11:37.109
review turnaround some of the improvements that the

01:11:37.109 --> 01:11:37.560
department has

01:11:37.560 --> 01:11:40.739
made in terms of processing projects and getting in through

01:11:40.739 --> 01:11:41.720
the review process

01:11:41.720 --> 01:11:45.770
and approval process. So that being said we'll get we'll

01:11:45.770 --> 01:11:48.359
get we'll dive in. I've

01:11:48.359 --> 01:11:51.680
arranged the project types and kind of how they they work

01:11:51.680 --> 01:11:52.399
within the

01:11:52.399 --> 01:11:58.340
development process. So we'll start off with with typically

01:11:58.340 --> 01:11:59.760
the very first

01:11:59.760 --> 01:12:03.689
concept plan that we look at within the city. So when a

01:12:03.689 --> 01:12:05.199
developer or property

01:12:05.199 --> 01:12:08.380
owner has an idea of what they would like to do they they

01:12:08.380 --> 01:12:09.640
often contact the

01:12:09.640 --> 01:12:13.760
city and start what's called a pre-development meeting and

01:12:13.760 --> 01:12:14.319
what that

01:12:14.319 --> 01:12:16.909
meeting is is they they submit a concept plan maybe a

01:12:16.909 --> 01:12:17.920
narrative and some

01:12:17.920 --> 01:12:21.710
questions to us and then we sit down with them for about an

01:12:21.710 --> 01:12:22.640
hour and talk

01:12:22.640 --> 01:12:26.369
through the city processes associated with what they would

01:12:26.369 --> 01:12:27.680
need to do maybe

01:12:27.680 --> 01:12:30.350
some regulations that they want to be aware of talk about

01:12:30.350 --> 01:12:31.359
some challenges that

01:12:31.359 --> 01:12:34.039
they may face with their development and just go through

01:12:34.039 --> 01:12:35.640
that. So we often sit

01:12:35.640 --> 01:12:38.010
down with the developer property owner sometimes they have

01:12:38.010 --> 01:12:38.600
an engineer or

01:12:38.600 --> 01:12:41.779
architect and then the city departments that are often

01:12:41.779 --> 01:12:42.520
involved in these

01:12:42.520 --> 01:12:45.760
pre-development meetings are planning building inspections

01:12:45.760 --> 01:12:47.760
engineering fire so

01:12:47.760 --> 01:12:50.420
we try to work through some of those those items that they

01:12:50.420 --> 01:12:51.180
're going to be

01:12:51.180 --> 01:12:54.829
faced with as they develop. There's no approval for it it

01:12:54.829 --> 01:12:55.960
really is just the

01:12:55.960 --> 01:12:59.140
beginning of a conversation with them so so it just it

01:12:59.140 --> 01:13:00.399
stops at the review

01:13:00.399 --> 01:13:06.760
process. The second project types type that we're gonna

01:13:06.760 --> 01:13:07.720
talk about is is the

01:13:07.720 --> 01:13:11.800
entitlement and and that's kind of the next step in the

01:13:11.800 --> 01:13:12.960
process. So if during

01:13:12.960 --> 01:13:16.779
the pre-development meeting we determine that the property

01:13:16.779 --> 01:13:17.960
is in the ETJ and they

01:13:17.960 --> 01:13:21.140
would like to come into the city then the next project type

01:13:21.140 --> 01:13:21.600
would be an

01:13:21.600 --> 01:13:26.779
annexation. This this Commission doesn't doesn't hear annex

01:13:26.779 --> 01:13:27.539
ation so it goes

01:13:27.539 --> 01:13:32.449
straight to City Council for approval. The the next project

01:13:32.449 --> 01:13:33.600
types comprehensive

01:13:33.600 --> 01:13:36.449
plan amendment zoning change master plan community specific

01:13:36.449 --> 01:13:37.279
use permit plan

01:13:37.279 --> 01:13:40.050
development amendment. If you've been on the planning and

01:13:40.050 --> 01:13:41.159
zoning Commission for

01:13:41.159 --> 01:13:44.529
a while you're very familiar with these and they follow a

01:13:44.529 --> 01:13:45.880
process of staff

01:13:45.880 --> 01:13:50.010
review public hearing P&Z as the recommending body will

01:13:50.010 --> 01:13:50.479
make a

01:13:50.479 --> 01:13:53.659
recommendation and then City Council will either approve

01:13:53.659 --> 01:13:55.199
deny or approve with

01:13:55.199 --> 01:13:59.130
conditions depending on the project type. There are a

01:13:59.130 --> 01:14:00.239
couple more slides and then we'll

01:14:00.239 --> 01:14:03.489
let y'all get get on to your next meeting. So once the

01:14:03.489 --> 01:14:04.880
entitlement is in

01:14:04.880 --> 01:14:07.770
place then you start looking at how the property is going

01:14:07.770 --> 01:14:08.859
to develop and so we

01:14:08.859 --> 01:14:11.579
look at things like platting and ESAs. So Deborah gave a

01:14:11.579 --> 01:14:12.960
really good overview of

01:14:12.960 --> 01:14:15.770
ESAs in this city and that we do have those environmentally

01:14:15.770 --> 01:14:17.439
sensitive areas. So

01:14:17.439 --> 01:14:22.659
if if a piece of property has what may be an

01:14:22.659 --> 01:14:24.359
environmentally sensitive area on

01:14:24.359 --> 01:14:28.439
it the applicant will put in a project to to the city and

01:14:28.439 --> 01:14:29.479
they can either hire

01:14:29.479 --> 01:14:33.130
a consultant or they can ask Deborah and her group to go

01:14:33.130 --> 01:14:34.760
out and and and do a

01:14:34.760 --> 01:14:38.489
field assessment of the property. Look at the biological

01:14:38.489 --> 01:14:40.000
markers to see if an ESA

01:14:40.000 --> 01:14:42.590
is present and what and then what the the limits of that ES

01:14:42.590 --> 01:14:44.319
A are. So that that

01:14:44.319 --> 01:14:48.279
ends with staff and it's either approved that or it's

01:14:48.279 --> 01:14:49.439
either determined that

01:14:49.439 --> 01:14:52.260
there's an ESA there and and what those limits are or it's

01:14:52.260 --> 01:14:53.239
or the ESA is removed

01:14:53.239 --> 01:14:56.000
if those biological markers aren't there. So y'all would

01:14:56.000 --> 01:14:56.760
never see that

01:14:56.760 --> 01:15:01.380
assessment. Items that you will see would be a subdivision

01:15:01.380 --> 01:15:02.319
variance those don't

01:15:02.319 --> 01:15:04.819
happen very often but if an applicant wants to vary from

01:15:04.819 --> 01:15:05.960
sub chapter 16 of the

01:15:05.960 --> 01:15:09.140
Denton Development Code y'all that would come before the

01:15:09.140 --> 01:15:09.880
Planning and Zoning

01:15:09.880 --> 01:15:13.119
Commission. Conveyance plats, general development plans and

01:15:13.119 --> 01:15:13.800
then preliminary

01:15:13.800 --> 01:15:17.949
plats. Amending and minor plots are approved at the staff

01:15:17.949 --> 01:15:19.199
level. They're

01:15:19.199 --> 01:15:22.140
typically either an amending plat it's a platted property

01:15:22.140 --> 01:15:23.159
that maybe they're

01:15:23.159 --> 01:15:27.109
either removing a lot line or they're or they're shifting a

01:15:27.109 --> 01:15:28.439
lot line or maybe

01:15:28.439 --> 01:15:31.869
they're correcting an error on the plat. That would be an

01:15:31.869 --> 01:15:33.199
amending plat that's

01:15:33.199 --> 01:15:36.399
administratively approved at the staff level. A minor plat

01:15:36.399 --> 01:15:37.159
is a plat that is

01:15:37.159 --> 01:15:40.340
fewer than four lots and no public improvements are

01:15:40.340 --> 01:15:41.720
required so because the

01:15:41.720 --> 01:15:44.310
impact is pretty low that is also a minor plat per the

01:15:44.310 --> 01:15:45.399
Texas Local Government

01:15:45.399 --> 01:15:48.350
Code and the Denton Development Code and once again that's

01:15:48.350 --> 01:15:50.039
approved at staff level.

01:15:50.039 --> 01:15:55.680
Do we wrap it up? Yes. Okay so I have several more slides

01:15:55.680 --> 01:15:56.279
but we'll finish

01:15:56.279 --> 01:16:00.359
that at an upcoming meeting. Sounds great. Thanks Julie for

01:16:00.359 --> 01:16:03.359
laying that down. At this

01:16:03.359 --> 01:16:09.710
time absolutely. I'm sorry I wanted to introduce Christy U

01:16:09.710 --> 01:16:11.840
pton. Kind of come up

01:16:11.840 --> 01:16:14.300
I guess and tell you a little bit about her. She's working

01:16:14.300 --> 01:16:14.560
with Debra.

01:16:14.560 --> 01:16:19.989
She's an environmental compliance coordinator specialist.

01:16:19.989 --> 01:16:22.039
So I think on a

01:16:22.039 --> 01:16:26.680
lot of the ESAs as all ESAs come in front of you I think we

01:16:26.680 --> 01:16:28.439
'll be seeing her

01:16:28.439 --> 01:16:32.500
and maybe Debra less I don't know but at least wanted to

01:16:32.500 --> 01:16:33.800
put a name with the face.

01:16:33.800 --> 01:16:39.439
As I transition out of the DRC process Cindy has taken my

01:16:39.439 --> 01:16:40.239
position as an

01:16:40.239 --> 01:16:43.880
environmental compliance coordinator. Anything related to

01:16:43.880 --> 01:16:46.800
stone water, ESAs,

01:16:46.800 --> 01:16:50.029
municipal setting designations, anything that falls under

01:16:50.029 --> 01:16:51.319
the big umbrella of

01:16:51.319 --> 01:16:54.039
environmental that will be something that she will handle.

01:16:54.039 --> 01:16:55.399
She's coming from

01:16:55.399 --> 01:17:01.210
the airport and prior to that over 13 years of experience

01:17:01.210 --> 01:17:01.560
working

01:17:01.560 --> 01:17:05.149
with municipalities in the Metroplex. So she comes with a

01:17:05.149 --> 01:17:05.600
very strong

01:17:05.600 --> 01:17:13.319
reputation and let's see. We wish them the best. Thank you.

01:17:13.319 --> 01:17:16.199
Awesome welcome.

01:17:18.319 --> 01:17:21.109
So thank you again Julie for starting that discussion

01:17:21.109 --> 01:17:22.640
hopefully in either next

01:17:22.640 --> 01:17:25.819
meeting or a meeting soon to come we'll have the rest of

01:17:25.819 --> 01:17:26.720
this which is super

01:17:26.720 --> 01:17:29.199
helpful. Thank you. At this time we'll close work session

01:17:29.199 --> 01:17:31.800
at 629. We will meet

01:17:31.800 --> 01:17:40.039
in council chambers and start our public hearing at 635.

01:17:40.039 --> 01:17:40.119
Thanks.

01:17:49.159 --> 01:17:49.300
Good evening and welcome to the Planning and Zoning

01:17:49.300 --> 01:17:53.560
Commission meeting for

01:17:53.560 --> 01:17:57.109
September 12th. I'll call this to order at 640. I apologize

01:17:57.109 --> 01:17:58.119
for the delay we're

01:17:58.119 --> 01:18:00.590
wrapping up items and work sessions so thank you for being

01:18:00.590 --> 01:18:01.399
patient. The first

01:18:01.399 --> 01:18:03.409
order of business is to stand and give a pledge allegiance

01:18:03.409 --> 01:18:04.199
to the United States

01:18:04.199 --> 01:18:06.800
and Texas flag.

01:18:18.319 --> 01:18:43.560
First item on our agenda is the consent agenda. The chair

01:18:43.560 --> 01:18:44.119
will stand for any

01:18:44.119 --> 01:18:52.039
discussion or motion and as a point of order item 3C of the

01:18:52.039 --> 01:18:53.079
consent agenda

01:18:53.079 --> 01:18:57.239
item FP 18-0017 has been postponed will not be on the

01:18:57.239 --> 01:18:58.439
consent agenda vote for

01:18:58.439 --> 01:19:00.880
this evening.

01:19:04.520 --> 01:19:07.699
Commissioner Ellis. Thank you chair motion to approve

01:19:07.699 --> 01:19:09.119
consent agenda items A

01:19:09.119 --> 01:19:13.640
and B. Thank you and Commissioner Beck. Second. First and

01:19:13.640 --> 01:19:16.039
second any discussion.

01:19:16.039 --> 01:19:30.210
Seeing none I call for a vote on the board. Motion passes 6

01:19:30.210 --> 01:19:35.000
-0 with one absent.

01:19:35.000 --> 01:19:38.750
Next is our public hearings. As a point of order we have

01:19:38.750 --> 01:19:41.239
moved agenda item 3B is

01:19:41.239 --> 01:19:46.670
in Bravo to 3A to hear the final replat first tonight so

01:19:46.670 --> 01:19:47.960
with that I'll invite

01:19:47.960 --> 01:19:53.550
Cindy Jackson for presentation on FR 18-005 and I'll open

01:19:53.550 --> 01:19:54.239
the public hearing

01:19:54.239 --> 01:19:56.680
for this item.

01:20:05.000 --> 01:20:14.670
Thank you. This is a request for approval of a final replat

01:20:14.670 --> 01:20:15.640
of lot 1R

01:20:15.640 --> 01:20:20.359
block A of the hilltop ranch addition. The 3.5 acre site is

01:20:20.359 --> 01:20:21.359
located on the west

01:20:21.359 --> 01:20:25.899
side of hilltop drive you can see it right here. It is

01:20:25.899 --> 01:20:28.239
located in the city's

01:20:28.239 --> 01:20:32.050
extraterritorial jurisdiction or ETJ. The site was

01:20:32.050 --> 01:20:34.239
originally plotted as lot one

01:20:34.239 --> 01:20:40.050
block A hilltop ranch addition in 2006. It was subdivided

01:20:40.050 --> 01:20:42.399
into two lots in 2007

01:20:42.399 --> 01:20:46.760
and now here we are again subdividing one of the lots. One

01:20:46.760 --> 01:20:47.760
of the lots was

01:20:47.760 --> 01:20:52.500
developed with a single-family home and it is being subd

01:20:52.500 --> 01:20:54.079
ivided into two lots

01:20:54.079 --> 01:20:57.260
which you can see here is this lot and this lot that

01:20:57.260 --> 01:21:02.039
continues on over here. The

01:21:02.039 --> 01:21:05.970
plot as shown meets the requirements of the subdivision

01:21:05.970 --> 01:21:07.279
ordinance and staff

01:21:07.279 --> 01:21:11.560
recommends approval. That concludes my presentation. Thank

01:21:11.560 --> 01:21:12.760
you Cindy. I don't see

01:21:12.760 --> 01:21:16.479
any questions at this time. Okay. This is a public hearing

01:21:16.479 --> 01:21:17.199
if anyone wishes to

01:21:17.199 --> 01:21:21.760
speak on this issue may more than welcome to do so.

01:21:24.039 --> 01:21:26.640
Seeing no one to speak I will close this public hearing and

01:21:26.640 --> 01:21:28.119
open it for discussion

01:21:28.119 --> 01:21:36.039
or motion. Commissioner Beck. I move we approve FR 18005.

01:21:36.039 --> 01:21:37.840
Commissioner Sanchez.

01:21:37.840 --> 01:21:42.039
We have a first and a second. Is there any discussion?

01:21:42.039 --> 01:21:43.960
Seeing none I'll call for a vote

01:21:43.960 --> 01:21:46.279
on the board.

01:21:50.560 --> 01:21:56.460
Motion carries 6-0 with one absent. The next agenda item

01:21:56.460 --> 01:21:58.960
will be the new 3B

01:21:58.960 --> 01:22:04.550
which is Z 18-20A and Cindy Jackson will be presenting. I

01:22:04.550 --> 01:22:05.399
will open the

01:22:05.399 --> 01:22:11.000
public hearing for the item. Thank you. This is a request

01:22:11.000 --> 01:22:12.159
to hold a public

01:22:12.159 --> 01:22:14.720
hearing and make a recommendation to the City Council

01:22:14.720 --> 01:22:16.119
regarding our request for

01:22:16.119 --> 01:22:20.050
an initial zoning designation of neighborhood residential 3

01:22:20.050 --> 01:22:20.840
and our 3 on

01:22:20.840 --> 01:22:27.000
approximately 47.466 acres. The site is generally located

01:22:27.000 --> 01:22:27.880
on the south side of

01:22:27.880 --> 01:22:32.319
Ryan Road you can see here north east of the intersection

01:22:32.319 --> 01:22:33.600
of Ryan and Andrew and

01:22:33.600 --> 01:22:39.560
north of Creekdale View. The site is the subject of a pre-

01:22:39.560 --> 01:22:41.439
annexation agreement or

01:22:41.439 --> 01:22:49.439
PADA ordinance number 2016-215. This site is referenced as

01:22:49.439 --> 01:22:50.560
track 1C in

01:22:50.560 --> 01:22:53.989
the PADA. Two other tracks are included but they are not

01:22:53.989 --> 01:22:54.840
the subject of this

01:22:54.840 --> 01:23:00.720
request. The PADA governs the sequence of development and

01:23:00.720 --> 01:23:02.079
contains land use and

01:23:02.079 --> 01:23:06.529
development standards. The site has been plotted it was

01:23:06.529 --> 01:23:08.560
approved in on March 21st

01:23:08.560 --> 01:23:14.720
2018 with 137 residential lots and a density of 2.9

01:23:14.720 --> 01:23:17.039
dwelling units per acre.

01:23:17.039 --> 01:23:23.119
The PADA has robust development standards and requirements

01:23:23.119 --> 01:23:23.880
which include

01:23:23.880 --> 01:23:27.060
the traffic impact fee. Typically for a development this

01:23:27.060 --> 01:23:28.520
size the city would

01:23:28.520 --> 01:23:34.880
require $342,500 in traffic impact fees. Instead the PADA

01:23:34.880 --> 01:23:43.100
required $589,100 in traffic impact fees which equates to $

01:23:43.100 --> 01:23:45.359
4,300 per unit.

01:23:45.359 --> 01:23:49.779
There's also stringent tree preservation requirements. The

01:23:49.779 --> 01:23:51.840
DDC requires 20% of

01:23:51.840 --> 01:24:00.109
the trees on the site to be preserved. The PADA requires 76

01:24:00.109 --> 01:24:02.699
% of the diameter

01:24:02.699 --> 01:24:07.069
inches of the trees which equates to 82% of all trees being

01:24:07.069 --> 01:24:10.039
preserved. Here's a

01:24:10.039 --> 01:24:14.920
bit of a breakdown. There are 720 trees on the total site

01:24:14.920 --> 01:24:17.199
and 590 of them were

01:24:17.199 --> 01:24:22.420
preserved coming to 81.9% and then you can see a breakdown

01:24:22.420 --> 01:24:23.039
according to

01:24:23.039 --> 01:24:28.159
diameter inches which is 76.3% of the diameter inches being

01:24:28.159 --> 01:24:29.960
preserved. You can

01:24:29.960 --> 01:24:35.380
see on this particular exhibit that trees are being

01:24:35.380 --> 01:24:35.840
preserved mainly

01:24:35.840 --> 01:24:42.550
along the west and south side of the site. The sequence of

01:24:42.550 --> 01:24:44.000
development for

01:24:44.000 --> 01:24:49.960
this property was not typical. The typical sequence is

01:24:49.960 --> 01:24:50.899
annexation

01:24:50.899 --> 01:24:54.159
zoning site plan, preliminary plat and final plat. Per the

01:24:54.159 --> 01:24:55.399
requirements of the

01:24:55.399 --> 01:25:00.520
PADA, the pre-annexation agreement came first, the concept

01:25:00.520 --> 01:25:01.920
plan, then the site

01:25:01.920 --> 01:25:06.079
plan, preliminary and final plat, annexation which occurred

01:25:06.079 --> 01:25:07.279
just last month,

01:25:07.279 --> 01:25:11.960
and then zoning which we are here tonight.

01:25:13.359 --> 01:25:19.039
Current zoning is RD5X as seen on the zoning map and the

01:25:19.039 --> 01:25:20.279
proposed zoning is

01:25:20.279 --> 01:25:25.720
NR3. The NR3 provides an excellent transition and buffer of

01:25:25.720 --> 01:25:28.199
the NR4 and NR6

01:25:28.199 --> 01:25:32.840
that is located to the south and east and to the NR2, a

01:25:32.840 --> 01:25:36.239
buffer to the NR2.

01:25:37.960 --> 01:25:42.920
Legal notices were sent out within 200 feet. We sent out 96

01:25:42.920 --> 01:25:44.079
via certified mail

01:25:44.079 --> 01:25:49.199
and we sent 192 courtesy notices via regular mail. We

01:25:49.199 --> 01:25:50.960
received six responses

01:25:50.960 --> 01:25:55.380
back which you received today. Those six responses you can

01:25:55.380 --> 01:25:56.800
see on the map in red

01:25:56.800 --> 01:26:01.640
and they equate to 3% of the property located within the

01:26:01.640 --> 01:26:02.600
200 foot buffer

01:26:02.600 --> 01:26:07.590
around the site. Three notification signs were also posted.

01:26:07.590 --> 01:26:09.000
Staff recommends

01:26:09.000 --> 01:26:11.890
approval of this request. It is compatible with the

01:26:11.890 --> 01:26:13.159
surrounding property

01:26:13.159 --> 01:26:15.880
and is consistent with the requirements set forth in the

01:26:15.880 --> 01:26:16.520
pre-annexation

01:26:16.520 --> 01:26:20.600
development agreement. That concludes my presentation.

01:26:20.600 --> 01:26:22.680
Thank you Cindy. For the

01:26:22.680 --> 01:26:26.159
edification of the commission and the audience, can you

01:26:26.159 --> 01:26:28.399
mention also the topic

01:26:28.399 --> 01:26:31.350
of road improvement that you mentioned in the work session

01:26:31.350 --> 01:26:33.880
please? Right now I know a

01:26:33.880 --> 01:26:37.319
lot of the residents surrounding residents are concerned

01:26:37.319 --> 01:26:38.920
about traffic,

01:26:38.920 --> 01:26:45.489
have traffic concerns for Ryan Road. The city staff is

01:26:45.489 --> 01:26:47.319
aware of the issue. They

01:26:47.319 --> 01:26:50.649
currently are doing traffic counts along Ryan Road to

01:26:50.649 --> 01:26:53.319
assess the situation. They

01:26:53.319 --> 01:26:57.109
are also, the City Council last night approved funding for

01:26:57.109 --> 01:26:57.960
an update of the

01:26:57.960 --> 01:27:01.890
mobility plan which is the first step in the road to

01:27:01.890 --> 01:27:04.520
getting Ryan Road improved.

01:27:04.520 --> 01:27:10.880
And then it is true that a light at Ryan Road and 1830 is a

01:27:10.880 --> 01:27:12.520
text on mutual

01:27:12.520 --> 01:27:16.470
issue. It's not a city. It's not a city issue. Okay. I don

01:27:16.470 --> 01:27:17.359
't see any other

01:27:17.359 --> 01:27:20.800
questions for you at this time. Okay thank you. Oh excuse

01:27:20.800 --> 01:27:20.960
me,

01:27:20.960 --> 01:27:30.439
Commissioner Pernitta. With the development sequence being

01:27:30.439 --> 01:27:31.439
irregular

01:27:31.439 --> 01:27:34.149
right now, the preliminary plan and the final plan have

01:27:34.149 --> 01:27:36.439
already been approved. I

01:27:36.439 --> 01:27:39.130
know a lot of the people that are here probably going to be

01:27:39.130 --> 01:27:40.319
expressing opinions

01:27:40.319 --> 01:27:43.920
about traffic and things like that. At this point we're

01:27:43.920 --> 01:27:45.359
simply approving the

01:27:45.359 --> 01:27:48.539
zoning, right? So there's, as far as everything else goes,

01:27:48.539 --> 01:27:49.479
there's not much we

01:27:49.479 --> 01:27:53.659
can do at this point. Is that correct? That's correct. The

01:27:53.659 --> 01:27:57.079
applicant, that's true.

01:27:57.079 --> 01:28:02.510
As I explained, the city is aware of the issue. They are

01:28:02.510 --> 01:28:03.000
working

01:28:03.000 --> 01:28:08.119
on getting traffic counts from the area right now and they

01:28:08.119 --> 01:28:09.479
are going to update

01:28:09.479 --> 01:28:12.420
the mobility plan which is the first step in improving Ryan

01:28:12.420 --> 01:28:16.520
Road. Thank you. I do

01:28:16.520 --> 01:28:19.840
not see any questions. Thank you Cindy. Do you have a card

01:28:19.840 --> 01:28:20.880
to speak on this? It's

01:28:20.880 --> 01:28:24.899
Thomas Fletcher, the applicant, who's in support. If you

01:28:24.899 --> 01:28:26.359
would, when you come to

01:28:26.359 --> 01:28:29.029
the mic say your name and address for the record and as the

01:28:29.029 --> 01:28:29.760
applicant you're

01:28:29.760 --> 01:28:36.350
provided 10 minutes. Thank you. Good evening commissioners.

01:28:36.350 --> 01:28:37.279
My name is Thomas

01:28:37.279 --> 01:28:41.479
Fletcher with Kinley Horne 5750 Genesis Court, Frisco,

01:28:41.479 --> 01:28:44.600
Texas 75034. I am the

01:28:44.600 --> 01:28:48.630
engineer for the landowner. Actually because of the PADA,

01:28:48.630 --> 01:28:49.560
the applicant is the

01:28:49.560 --> 01:28:53.210
city as part of the process, but we are here to provide

01:28:53.210 --> 01:28:54.800
information and answer

01:28:54.800 --> 01:28:57.770
any questions. I did want to, I sat in, I walked into the

01:28:57.770 --> 01:28:58.760
work session, I believe

01:28:58.760 --> 01:29:01.220
probably a couple minutes late into the presentation, but I

01:29:01.220 --> 01:29:02.079
did hear a lot of the

01:29:02.079 --> 01:29:05.260
questions. What I wanted to do is really just kind of talk

01:29:05.260 --> 01:29:06.640
about some of

01:29:06.640 --> 01:29:09.590
the questions that I heard and hopefully I can answer kind

01:29:09.590 --> 01:29:10.680
of the process. There

01:29:10.680 --> 01:29:12.800
were a lot of questions about the process and how did we

01:29:12.800 --> 01:29:13.319
get to that

01:29:13.319 --> 01:29:17.840
process. I have been on this project since its inception.

01:29:17.840 --> 01:29:19.220
The original

01:29:19.220 --> 01:29:22.180
landowners of the property had put their property up for

01:29:22.180 --> 01:29:23.720
sale. They were marketing

01:29:23.720 --> 01:29:27.470
it. A developer put it under contract. We had pre-develop

01:29:27.470 --> 01:29:28.479
ment meetings with the

01:29:28.479 --> 01:29:32.409
city. The landowners were concerned. They did not want to

01:29:32.409 --> 01:29:33.800
annex the property

01:29:33.800 --> 01:29:37.510
because the concern was if we annexed into the city and

01:29:37.510 --> 01:29:39.199
then the developer was

01:29:39.199 --> 01:29:42.050
not able to get the zoning he needed in order to do the

01:29:42.050 --> 01:29:43.800
development, then he

01:29:43.800 --> 01:29:46.319
would not purchase the property and now they're within the

01:29:46.319 --> 01:29:48.199
city. So when we met

01:29:48.199 --> 01:29:51.380
with the city, we talked about, okay how can we work

01:29:51.380 --> 01:29:53.039
through this process to come

01:29:53.039 --> 01:29:56.619
to some resolution that works best for the city and for the

01:29:56.619 --> 01:29:57.800
developer that we

01:29:57.800 --> 01:30:01.770
can both agree to. So as part of that process, the city was

01:30:01.770 --> 01:30:02.279
, there were several

01:30:02.279 --> 01:30:05.460
things. I'll talk about several things. One, the traffic

01:30:05.460 --> 01:30:06.920
impact fees. The city was

01:30:06.920 --> 01:30:11.279
in the process of looking at traffic impact based on

01:30:11.279 --> 01:30:12.399
development, what those

01:30:12.399 --> 01:30:16.079
roadway impact fees should be. There wasn't an adopted

01:30:16.079 --> 01:30:17.319
ordinance at the time.

01:30:17.319 --> 01:30:24.829
I think the initial thing that was looked at was a $3,000

01:30:24.829 --> 01:30:25.439
per lot when

01:30:25.439 --> 01:30:29.159
you look at single-family. I think $2,500 was what was

01:30:29.159 --> 01:30:30.880
adopted. That

01:30:30.880 --> 01:30:34.319
impact analysis actually had an analysis of what was the

01:30:34.319 --> 01:30:36.279
true impact. When

01:30:36.279 --> 01:30:40.109
we came through with this agreement, we said, okay well let

01:30:40.109 --> 01:30:41.479
's negotiate this true

01:30:41.479 --> 01:30:45.310
impact. So instead of us paying $3,000, which was kind of

01:30:45.310 --> 01:30:46.880
being talked about at

01:30:46.880 --> 01:30:51.680
the time, or $2,500, which is where the city ended, it was

01:30:51.680 --> 01:30:53.840
a $43,000 or roughly $4,300

01:30:53.840 --> 01:30:57.560
per lot. So this development, part of the agreement, was

01:30:57.560 --> 01:30:58.399
going to pay more in

01:30:58.399 --> 01:31:01.399
roadway impact fees. The other thing is, is we knew that it

01:31:01.399 --> 01:31:01.960
was going to be

01:31:01.960 --> 01:31:04.880
sensitive with the surrounding neighborhoods. The majority

01:31:04.880 --> 01:31:05.680
of the trees

01:31:05.680 --> 01:31:09.289
buffered the existing neighborhoods, so we decided, okay

01:31:09.289 --> 01:31:10.720
let's do a development

01:31:10.720 --> 01:31:13.899
that's internal to the main tree canopy. Let's preserve

01:31:13.899 --> 01:31:15.380
those trees. Let's create

01:31:15.380 --> 01:31:19.380
a high standard of tree preservation. So that was another

01:31:19.380 --> 01:31:20.840
item that was a part of

01:31:20.840 --> 01:31:24.500
that. And then one of the other items that I'll point out

01:31:24.500 --> 01:31:25.260
is the city has a

01:31:25.260 --> 01:31:29.079
lift station, the Granada lift station, that's just north

01:31:29.079 --> 01:31:30.739
of the track. So in the

01:31:30.739 --> 01:31:33.920
discussions with the city, one of the city's long-term

01:31:33.920 --> 01:31:35.159
goals was to get that

01:31:35.159 --> 01:31:37.869
lift station offline to save with the maintenance and

01:31:37.869 --> 01:31:39.199
development costs. So the

01:31:39.199 --> 01:31:44.489
developer agreed to extend a sanitary sewer line up north

01:31:44.489 --> 01:31:46.000
of Ryan Road so that

01:31:46.000 --> 01:31:50.149
the city could connect that system to that so that that

01:31:50.149 --> 01:31:51.640
would enable them to

01:31:51.640 --> 01:31:54.109
take that lift station offline, which would save on

01:31:54.109 --> 01:31:55.279
maintenance and operation

01:31:55.279 --> 01:31:58.630
costs long-term for the city. So we went through different

01:31:58.630 --> 01:31:59.960
planning iterations. We

01:31:59.960 --> 01:32:03.310
came up with different land plan layouts. City staff was a

01:32:03.310 --> 01:32:04.640
part of that. There's

01:32:04.640 --> 01:32:08.869
been a lot of changes in the city staff that from that time

01:32:08.869 --> 01:32:10.920
to now. So but you

01:32:10.920 --> 01:32:14.100
know we went through the iterations to come up with a land

01:32:14.100 --> 01:32:14.960
plan that tried to

01:32:14.960 --> 01:32:18.619
take advantage of the tree preservation, minimize the

01:32:18.619 --> 01:32:20.680
number of lots, minimize the

01:32:20.680 --> 01:32:24.899
impact, and just provide this natural development. The

01:32:24.899 --> 01:32:26.420
other thing it did is it

01:32:26.420 --> 01:32:29.670
created a preservation track 1B, which is the middle track,

01:32:29.670 --> 01:32:31.079
which is roughly 22

01:32:31.079 --> 01:32:35.329
acres, which has about 11 to 12 acres of floodplain. It

01:32:35.329 --> 01:32:37.119
limited that in the future

01:32:37.119 --> 01:32:39.819
to no more than three residential units. So that was

01:32:39.819 --> 01:32:41.239
another thing that the city

01:32:41.239 --> 01:32:45.420
saw as a benefit and then there was the remainder that was

01:32:45.420 --> 01:32:46.520
became part of the

01:32:46.520 --> 01:32:49.399
Good Samaritan piece that would eventually develop with

01:32:49.399 --> 01:32:50.720
that. So really

01:32:50.720 --> 01:32:54.119
I've got a updated aerial. I don't know if...

01:32:54.119 --> 01:32:57.880
Yeah, can we turn the camera on?

01:32:58.520 --> 01:33:05.340
So here's the development. So you can see the side has been

01:33:05.340 --> 01:33:05.880
cleared. So

01:33:05.880 --> 01:33:08.479
we've gone through the preliminary plat's been approved,

01:33:08.479 --> 01:33:09.720
the final plat's been

01:33:09.720 --> 01:33:15.529
approved, the construction plans have been approved. We've

01:33:15.529 --> 01:33:15.960
done all

01:33:15.960 --> 01:33:18.659
our clearing and grading. We've had our pre-construction

01:33:18.659 --> 01:33:20.239
meeting. The sanitary

01:33:20.239 --> 01:33:23.960
sewer has been started. The utilities are in process. So

01:33:23.960 --> 01:33:25.479
just to kind of give you

01:33:25.479 --> 01:33:31.439
an update where we're at in the process, we did an ESA

01:33:31.439 --> 01:33:32.399
analysis and

01:33:32.399 --> 01:33:35.979
went through that process with the city and had that

01:33:35.979 --> 01:33:37.399
reviewed and met. There

01:33:37.399 --> 01:33:41.479
were parameters with impacts to the ESA and the PADA. So

01:33:41.479 --> 01:33:43.000
all of those items have

01:33:43.000 --> 01:33:47.789
been followed according to the PADA. The PADA stated that

01:33:47.789 --> 01:33:49.079
10 days within the

01:33:49.079 --> 01:33:52.810
approval of the final plat, the owner shall submit for

01:33:52.810 --> 01:33:54.439
voluntary annexation.

01:33:54.439 --> 01:33:58.039
The owner has done that. I will say this, the current owner

01:33:58.039 --> 01:33:59.479
developer, Dickerson

01:33:59.479 --> 01:34:02.329
Development, they're not the one that actually negotiated

01:34:02.329 --> 01:34:04.279
the PADA with the

01:34:04.279 --> 01:34:09.319
city. That developer entitled the property and sold them

01:34:09.319 --> 01:34:09.960
this tract.

01:34:09.960 --> 01:34:13.750
They're developing this tract under the rules of the PADA.

01:34:13.750 --> 01:34:15.920
But with that, I know

01:34:15.920 --> 01:34:18.779
there was a lot of discussion in the work session. I wanted

01:34:18.779 --> 01:34:19.600
to get up and kind

01:34:19.600 --> 01:34:23.390
of provide a little bit of history, talk about a few items.

01:34:23.390 --> 01:34:24.560
Show the side. I mean,

01:34:24.560 --> 01:34:29.090
you can see from the updated aerial that the tree buffer

01:34:29.090 --> 01:34:29.520
along the

01:34:29.520 --> 01:34:33.449
south and the tree buffer along the west has been preserved

01:34:33.449 --> 01:34:38.319
as obligated and

01:34:38.319 --> 01:34:42.960
as negotiated as part of the PADA.

01:34:44.319 --> 01:34:49.909
Thank you, Mr. Fletcher. I do not see any questions for you

01:34:49.909 --> 01:34:53.680
at this time. This is a

01:34:53.680 --> 01:34:56.210
public hearing. Anyone is more than welcome to speak. I do

01:34:56.210 --> 01:34:57.880
have a card from

01:34:57.880 --> 01:35:01.239
a Jay Leak. There wasn't an agenda item posted. Is this

01:35:01.239 --> 01:35:02.119
item something you would

01:35:02.119 --> 01:35:04.640
like to speak on?

01:35:06.640 --> 01:35:09.640
Perfect.

01:35:09.640 --> 01:35:13.159
Got it. Thank you.

01:35:14.319 --> 01:35:21.840
Happy to answer any other questions or concerns. I'm going

01:35:21.840 --> 01:35:22.720
to come forward and state

01:35:22.720 --> 01:35:27.800
your name and address for the record. My name is Eric Clark

01:35:27.800 --> 01:35:29.479
. I live at 3913

01:35:29.479 --> 01:35:33.720
Andrew Avenue. It's just a general question. I appreciate

01:35:33.720 --> 01:35:34.439
the

01:35:34.439 --> 01:35:37.619
thoughtfulness that's went into this development and the

01:35:37.619 --> 01:35:38.479
tree preservation.

01:35:38.479 --> 01:35:41.850
But as a home that backs up to that, I've noticed several

01:35:41.850 --> 01:35:42.760
of the trees have

01:35:42.760 --> 01:35:46.449
died due to the excavation and the road work that's been

01:35:46.449 --> 01:35:48.600
done. Is there a plan to

01:35:48.600 --> 01:35:52.529
go back and reassess those big mature trees that have died?

01:35:52.529 --> 01:35:53.039
It's a good

01:35:53.039 --> 01:35:57.239
question, Mr. Clark. And we actually received other input

01:35:57.239 --> 01:35:58.239
from residents about

01:35:58.239 --> 01:36:01.420
this concern. Cindy, could you speak to the oversight that

01:36:01.420 --> 01:36:02.319
happens on a project

01:36:02.319 --> 01:36:06.640
like this? I'm not sure where these trees are, but

01:36:06.640 --> 01:36:07.920
apparently they tried to

01:36:07.920 --> 01:36:12.090
save more trees, as many trees as possible. And what

01:36:12.090 --> 01:36:13.600
happened is the road

01:36:13.600 --> 01:36:17.989
cut through the drip line of some of the trees, cut off the

01:36:17.989 --> 01:36:20.359
roots. So any trees

01:36:20.359 --> 01:36:25.789
that are lost will have to be replaced. And I was also told

01:36:25.789 --> 01:36:27.180
that a lot of the

01:36:27.180 --> 01:36:31.460
trees were responding to drought conditions. And the urban

01:36:31.460 --> 01:36:32.939
forester, Haywood

01:36:32.939 --> 01:36:36.350
Morgan, went out just last week and he noticed that a lot

01:36:36.350 --> 01:36:37.560
of the trees that he

01:36:37.560 --> 01:36:41.359
thought were dead are actually relieving now. So he thinks

01:36:41.359 --> 01:36:42.319
that a lot of that was

01:36:42.319 --> 01:36:47.510
due to the drought. And going forward, is there a point of

01:36:47.510 --> 01:36:48.359
contact within the city

01:36:48.359 --> 01:36:51.890
that residents could communicate with regarding the project

01:36:51.890 --> 01:36:53.199
and the trees going

01:36:53.199 --> 01:36:55.659
forward? Well, they can contact me about the project. The

01:36:55.659 --> 01:36:56.600
trees specifically would

01:36:56.600 --> 01:37:01.239
be our urban forester, Haywood Morgan. Okay, perfect. Mr.

01:37:01.239 --> 01:37:03.760
Clark, are you good? Okay.

01:37:03.760 --> 01:37:07.960
Question? Oh, Commissioner Beck. Wait a minute, Cindy.

01:37:07.960 --> 01:37:09.279
Quick question for you.

01:37:09.279 --> 01:37:13.710
You mentioned that the trees that have died as a result of

01:37:13.710 --> 01:37:14.800
the street going

01:37:14.800 --> 01:37:18.979
through, they'll be replaced. Will they be replaced there

01:37:18.979 --> 01:37:20.560
or will there be

01:37:20.560 --> 01:37:24.039
room to do that? That I don't know. They're going to be

01:37:24.039 --> 01:37:25.399
replaced on the site. On the

01:37:25.399 --> 01:37:29.119
site somewhere. Okay, thank you. Sir, if you could state

01:37:29.119 --> 01:37:30.600
your name and address. One

01:37:30.600 --> 01:37:33.090
quick question for her. What size are these trees you

01:37:33.090 --> 01:37:34.319
talking about? I mean,

01:37:34.319 --> 01:37:36.489
we're talking about 100 year old trees. Are we going to put

01:37:36.489 --> 01:37:37.319
a two foot tree in?

01:37:37.319 --> 01:37:40.600
That I don't know. They have to replace any dead trees.

01:37:40.600 --> 01:37:45.600
They have to place two to one for inches.

01:37:45.600 --> 01:37:50.039
My name is Billy Carraway and I live on Andrew Avenue. Our

01:37:50.039 --> 01:37:52.199
concern is, what are

01:37:52.199 --> 01:37:55.000
the quality of these homes? We have not seen any sketches

01:37:55.000 --> 01:37:55.979
from the two meetings

01:37:55.979 --> 01:37:59.159
we've had. I mean, express homes is down the road and are $

01:37:59.159 --> 01:38:00.960
200,000. Our house is

01:38:00.960 --> 01:38:04.199
on Andrew Avenue. You can't touch them for under $400,000.

01:38:04.199 --> 01:38:05.159
So what kind of

01:38:05.159 --> 01:38:08.560
quality are we getting right next door to us? That's our

01:38:08.560 --> 01:38:10.079
concern.

01:38:11.840 --> 01:38:14.539
Could you speak to that developer? You can come in if you

01:38:14.539 --> 01:38:18.239
have an answer, Mr. Fletcher.

01:38:19.159 --> 01:38:24.750
So with the development cost and the cost of land, all that

01:38:24.750 --> 01:38:25.600
factors into

01:38:25.600 --> 01:38:29.100
really what a marketable home or what you can start a house

01:38:29.100 --> 01:38:30.159
. The house prices

01:38:30.159 --> 01:38:34.090
for this development will start no less than $350,000. They

01:38:34.090 --> 01:38:35.399
estimate that the

01:38:35.399 --> 01:38:39.640
houses will be $350,000 to $450,000. The two home builders

01:38:39.640 --> 01:38:40.319
that will be in this

01:38:40.319 --> 01:38:45.239
development are Perry Homes and Rendition Homes. So it's,

01:38:45.239 --> 01:38:45.880
we are, I mean,

01:38:45.880 --> 01:38:50.050
it's going to be a very high quality development, very high

01:38:50.050 --> 01:38:51.279
quality product,

01:38:51.279 --> 01:38:55.210
and it's going to be pricing in line with the adjacent

01:38:55.210 --> 01:38:56.479
subdivision.

01:38:56.479 --> 01:39:02.289
Thank you. If you can just explain the, maybe it might help

01:39:02.289 --> 01:39:04.279
give an idea of the lot sizes.

01:39:04.279 --> 01:39:09.399
So the lot sizes are, there's variable lot sizes. There's

01:39:09.399 --> 01:39:12.180
60 by 130 is a minimum,

01:39:12.180 --> 01:39:17.800
7,800 square feet. There are lots within the development

01:39:17.800 --> 01:39:18.840
that are extra wide.

01:39:18.840 --> 01:39:22.020
As part of the pre-annexation development agreement, one of

01:39:22.020 --> 01:39:22.920
the things that we

01:39:22.920 --> 01:39:26.970
heard from city staff is that there's not many homes or

01:39:26.970 --> 01:39:28.880
many lots within these

01:39:28.880 --> 01:39:32.479
newer neighborhoods that accommodate three-car garages. So

01:39:32.479 --> 01:39:33.800
what we try to do

01:39:33.800 --> 01:39:38.479
is provide some wider lots through the development. There's

01:39:38.479 --> 01:39:39.039
actually, I

01:39:39.039 --> 01:39:41.869
think it's a, I'd have to go back and look, but I believe

01:39:41.869 --> 01:39:43.760
there's 25 lots that

01:39:43.760 --> 01:39:47.729
have to be provided with the third-car garage. Now, you

01:39:47.729 --> 01:39:48.600
know, that can be a

01:39:48.600 --> 01:39:51.800
accomplished through a J swing front entry. It can be a

01:39:51.800 --> 01:39:53.600
traditional three-car

01:39:53.600 --> 01:39:57.140
front entry or it could be a tandem. So there's options

01:39:57.140 --> 01:39:58.079
from the builder,

01:39:58.079 --> 01:40:02.779
but what we try to do is build in lot sizes that would

01:40:02.779 --> 01:40:04.520
accommodate and allow

01:40:04.520 --> 01:40:07.939
for someone that wants to come in and be able to purchase

01:40:07.939 --> 01:40:09.479
and have that third-car

01:40:09.479 --> 01:40:13.489
garage and still have a nice lot, nice size house in the

01:40:13.489 --> 01:40:14.800
development.

01:40:14.800 --> 01:40:17.979
Christian Beck. Thank you, Chair. Mr. Fletcher, thanks for

01:40:17.979 --> 01:40:19.920
that information. Can you give us an

01:40:19.920 --> 01:40:24.479
idea of what exterior materials will be in use? So the, I

01:40:24.479 --> 01:40:26.000
mean, the exterior

01:40:26.000 --> 01:40:29.229
materials will have to meet all the requirements of the

01:40:29.229 --> 01:40:30.119
City of Denton's

01:40:30.119 --> 01:40:35.930
Code. Which are? I am not, I don't work a lot with the

01:40:35.930 --> 01:40:37.479
house plans themselves. I'm

01:40:37.479 --> 01:40:41.409
more on the horizontal infrastructure, doing the layout. So

01:40:41.409 --> 01:40:42.720
I don't know that.

01:40:42.720 --> 01:40:46.229
I'd hate to try and take a guess because I... You couldn't

01:40:46.229 --> 01:40:47.199
tell us if they were all

01:40:47.199 --> 01:40:51.449
brick and we had 40-year warranty roof shingles? Well, most

01:40:51.449 --> 01:40:52.920
builders have certain

01:40:52.920 --> 01:40:55.720
warranties that they, you know, that are standard in the

01:40:55.720 --> 01:40:57.520
industry. So I mean, all

01:40:57.520 --> 01:41:00.409
the homes will come with some type of warranty. I think

01:41:00.409 --> 01:41:01.840
usually the foundation

01:41:01.840 --> 01:41:04.930
is 10 years. I think there's a general one year. You know,

01:41:04.930 --> 01:41:06.439
I haven't seen what

01:41:06.439 --> 01:41:10.079
these two particular builders, what their warranties are.

01:41:10.079 --> 01:41:10.600
So I really, I

01:41:10.600 --> 01:41:14.199
wouldn't want to speak to that, but I know for them to be

01:41:14.199 --> 01:41:15.560
competitive in the

01:41:15.560 --> 01:41:20.000
market, they have to provide warranties on their product.

01:41:20.000 --> 01:41:21.439
Okay, thank you.

01:41:21.439 --> 01:41:25.239
Commissioner Ellis. Thank you, Chair. Mr. Fletcher, just so

01:41:25.239 --> 01:41:26.239
I can remember the

01:41:26.239 --> 01:41:30.260
plat, is the in and out just Ryan Road or Creekdale? That

01:41:30.260 --> 01:41:31.840
is correct. Is that, that's

01:41:31.840 --> 01:41:34.810
the only two connections? Yeah, there's the main entry is a

01:41:34.810 --> 01:41:35.920
divided entry off

01:41:35.920 --> 01:41:39.550
Ryan Road and then the secondary entry is off Creekdale.

01:41:39.550 --> 01:41:41.199
There's actually Thistle

01:41:41.199 --> 01:41:43.970
Hill, the development, if you were to pull their plat, they

01:41:43.970 --> 01:41:45.239
anticipated when

01:41:45.239 --> 01:41:47.779
they develop that there would be access from their

01:41:47.779 --> 01:41:48.880
development to this

01:41:48.880 --> 01:41:52.640
development and we... Thistle Ridge, right? Thistle Ridge,

01:41:52.640 --> 01:41:54.720
yeah. That street, Thistle Ridge, right?

01:41:54.720 --> 01:41:57.899
Oh yeah, it may be, yeah, absolutely. So when we went with

01:41:57.899 --> 01:41:59.439
city staff, initially we

01:41:59.439 --> 01:42:02.399
were looking at, okay, we need to make this connection. It

01:42:02.399 --> 01:42:03.720
was planned for and

01:42:03.720 --> 01:42:06.899
then as it was looked at because of the impacts to the

01:42:06.899 --> 01:42:08.159
development there,

01:42:08.159 --> 01:42:13.000
wanting to try and minimize that, create that buffer, that

01:42:13.000 --> 01:42:14.439
's when then it was

01:42:14.439 --> 01:42:17.430
decided between staff and the developer and based on

01:42:17.430 --> 01:42:18.880
feedback and input that

01:42:18.880 --> 01:42:22.060
let's do the two points connection because the the city of

01:42:22.060 --> 01:42:22.800
Denton has the

01:42:22.800 --> 01:42:26.270
remote access requirement for fire. You have to have two

01:42:26.270 --> 01:42:27.439
access points and they

01:42:27.439 --> 01:42:31.369
have to be a minimum separation of half the distance of the

01:42:31.369 --> 01:42:32.680
longest diagonal

01:42:32.680 --> 01:42:37.640
across the property. So with the two accesses provided that

01:42:37.640 --> 01:42:38.119
met that

01:42:38.119 --> 01:42:41.300
requirement, that additional connection to the adjacent

01:42:41.300 --> 01:42:42.319
neighborhood wasn't

01:42:42.319 --> 01:42:45.500
required and then we didn't have to go through the process

01:42:45.500 --> 01:42:46.039
of really

01:42:46.039 --> 01:42:51.470
interrupting them anymore or impacting them with that

01:42:51.470 --> 01:42:53.760
connection.

01:42:54.760 --> 01:42:59.000
I answer, Mr. Pletcher, thank you. Thank you.

01:42:59.000 --> 01:43:03.079
I could in response to the question regarding exterior

01:43:03.079 --> 01:43:07.039
materials, on page 22 of the PADA,

01:43:07.039 --> 01:43:10.970
that's in your backup, exterior sheathing materials that

01:43:10.970 --> 01:43:12.600
are permitted are brickstone,

01:43:12.600 --> 01:43:16.569
smooth stucco, and wood, hardy and equivalent siding. Mason

01:43:16.569 --> 01:43:17.880
ry, brickstone, or

01:43:17.880 --> 01:43:20.710
smooth stucco shall account for 90% of the exterior sheat

01:43:20.710 --> 01:43:22.800
hing materials.

01:43:22.800 --> 01:43:29.850
Can I play that last part again? Which part? The last part.

01:43:29.850 --> 01:43:32.279
Where 90%? Masonry, brickstone, or smooth stucco shall

01:43:32.279 --> 01:43:35.359
account for 90% of the exterior sheathing materials.

01:43:35.359 --> 01:43:38.159
Great, thank you.

01:43:40.960 --> 01:43:43.439
This is a public hearing if anyone wishes to speak on the

01:43:43.439 --> 01:43:44.560
item you know if I can do

01:43:44.560 --> 01:43:48.210
so. So I'm going to walk down. After you speak we just need

01:43:48.210 --> 01:43:49.680
you to fill out a blue card

01:43:49.680 --> 01:43:52.859
right outside the door. But if you could state your name

01:43:52.859 --> 01:43:56.399
and address for the record.

01:43:57.399 --> 01:44:01.560
I'm Bob Highly and I live at 3855 Leisure Lane which is a

01:44:01.560 --> 01:44:02.279
private road

01:44:02.279 --> 01:44:05.460
directly across the street from the development. And I've

01:44:05.460 --> 01:44:06.800
got two concerns.

01:44:06.800 --> 01:44:10.010
One is they keep building these large developments over

01:44:10.010 --> 01:44:11.359
Ryan Road and there

01:44:11.359 --> 01:44:17.199
really is no way to get from Ryan Road to any place else

01:44:17.199 --> 01:44:18.279
other than using Ryan

01:44:18.279 --> 01:44:21.029
Road. And they're dumping hundreds and hundreds of cars a

01:44:21.029 --> 01:44:22.119
day on Ryan Road and

01:44:22.119 --> 01:44:27.020
why are there no roads being put horizontally with these

01:44:27.020 --> 01:44:28.279
properties or

01:44:28.279 --> 01:44:31.039
something so people can get get places. I can't get out of

01:44:31.039 --> 01:44:31.720
my development in the

01:44:31.720 --> 01:44:34.189
morning when schools you know we're in between three

01:44:34.189 --> 01:44:35.479
elementary schools and it's

01:44:35.479 --> 01:44:40.319
you just can't get out. That's one concern and when they do

01:44:40.319 --> 01:44:41.600
make an in and

01:44:41.600 --> 01:44:45.399
then out they may make it so difficult to get through that

01:44:45.399 --> 01:44:46.600
development that you

01:44:46.600 --> 01:44:50.699
had to have a GPS to even find the in and the out. And so

01:44:50.699 --> 01:44:52.319
that's a major

01:44:52.319 --> 01:44:58.699
concern. The other concern is I couldn't tell from I've got

01:44:58.699 --> 01:44:59.159
a couple more

01:44:59.159 --> 01:45:03.270
concerns. I couldn't tell from the plant are there larger

01:45:03.270 --> 01:45:04.159
lots in the front of

01:45:04.159 --> 01:45:06.750
this development than there are in the back which is

01:45:06.750 --> 01:45:08.279
consistent with Hisohil

01:45:08.279 --> 01:45:11.229
Estates which was part of the agreement and also with

01:45:11.229 --> 01:45:12.640
Shadowbrook Estates which

01:45:12.640 --> 01:45:15.500
was part of the agreement of our surrounding developers

01:45:15.500 --> 01:45:16.560
that they would keep

01:45:16.560 --> 01:45:21.350
the lots similar to the size of our lots. So that's concern

01:45:21.350 --> 01:45:23.439
. And my last concern is

01:45:23.439 --> 01:45:26.869
we were fortunate enough to be annexed into the city of 10

01:45:26.869 --> 01:45:28.619
years ago with all

01:45:28.619 --> 01:45:33.359
these promises of you know getting services from the city.

01:45:33.359 --> 01:45:35.079
Today we still

01:45:35.079 --> 01:45:40.770
have wells, we have septic systems, we cannot get cable, we

01:45:40.770 --> 01:45:41.840
cannot get TXU

01:45:41.840 --> 01:45:48.079
electric and are there any utility advancements that's

01:45:48.079 --> 01:45:48.680
going to come down

01:45:48.680 --> 01:45:54.760
Ryan Road to help us out? Sure I appreciate your questions.

01:45:54.760 --> 01:45:56.960
The city, Cindy spoke

01:45:56.960 --> 01:45:59.779
to some road improvements going on so that's at the council

01:45:59.779 --> 01:46:00.479
level now to

01:46:00.479 --> 01:46:02.949
hopefully get the mobility plan moving towards the roads. I

01:46:02.949 --> 01:46:03.920
can ask Mr. Fletcher

01:46:03.920 --> 01:46:07.310
to come down and answer the question about is there gradi

01:46:07.310 --> 01:46:08.680
ating lot sizes from

01:46:08.680 --> 01:46:12.520
north to south or are they uniform lot size?

01:46:18.840 --> 01:46:22.989
They're relatively uniform lot sizes but what we did do if

01:46:22.989 --> 01:46:28.920
you look, so we we set

01:46:28.920 --> 01:46:32.359
the development off from Ryan Road so that there's buffers

01:46:32.359 --> 01:46:33.279
all around the

01:46:33.279 --> 01:46:37.210
development. So you've got approximately a 200 foot buffer

01:46:37.210 --> 01:46:38.479
so you will not have

01:46:38.479 --> 01:46:44.130
any homes in close proximity to Ryan Road. Then the buffer

01:46:44.130 --> 01:46:45.760
on the western edge

01:46:45.760 --> 01:46:48.979
I think down near the south I think it is as wide as a

01:46:48.979 --> 01:46:50.880
hundred feet or 120 and

01:46:50.880 --> 01:46:54.029
up towards the north I think it narrows up to about 80 feet

01:46:54.029 --> 01:46:56.079
. So the lot sizes

01:46:56.079 --> 01:46:58.680
are relatively uniform like I said there's some mixed in

01:46:58.680 --> 01:46:59.840
there that are 10

01:46:59.840 --> 01:47:03.210
feet wider to accommodate a third car garage but for the

01:47:03.210 --> 01:47:04.159
most part they're

01:47:04.159 --> 01:47:09.960
they're of relative same size. Thank you Mr. Fletcher.

01:47:09.960 --> 01:47:12.960
Your first homes will be located right there.

01:47:16.640 --> 01:47:21.199
Right to answer the comment about the entrance and the road

01:47:21.199 --> 01:47:23.039
so the city it was

01:47:23.039 --> 01:47:26.260
actually a discussion that they don't like straight through

01:47:26.260 --> 01:47:27.319
roads because what

01:47:27.319 --> 01:47:31.260
it does is it promotes cut through it promotes speeding and

01:47:31.260 --> 01:47:32.159
then when you have

01:47:32.159 --> 01:47:34.859
these residential neighborhoods where you have families and

01:47:34.859 --> 01:47:35.720
you have kids that

01:47:35.720 --> 01:47:39.439
are going to be crossing the street and playing you want to

01:47:39.439 --> 01:47:40.640
make them safe so

01:47:40.640 --> 01:47:43.590
you want to make it harder for people to use that as a

01:47:43.590 --> 01:47:45.119
speedway. So that was

01:47:45.119 --> 01:47:48.569
intentionally done and that was that was worked through

01:47:48.569 --> 01:47:50.000
when we went through the

01:47:50.000 --> 01:47:54.520
process of working out this land plan with the with the

01:47:54.520 --> 01:47:55.000
city.

01:47:59.000 --> 01:48:03.439
Can you set to the mic so make sure everyone hears? I like

01:48:03.439 --> 01:48:03.920
the fact that

01:48:03.920 --> 01:48:07.720
they're buffering the front of the development and I have

01:48:07.720 --> 01:48:08.520
no problem with

01:48:08.520 --> 01:48:11.890
the way the development is built but I think the city needs

01:48:11.890 --> 01:48:12.640
to take into

01:48:12.640 --> 01:48:15.869
consideration that people need to get from point A to point

01:48:15.869 --> 01:48:17.039
B without going

01:48:17.039 --> 01:48:21.619
you know three miles away and normally you have access

01:48:21.619 --> 01:48:23.359
routes and they need to

01:48:23.359 --> 01:48:25.819
take that consideration because the original plot I saw

01:48:25.819 --> 01:48:26.319
when they were

01:48:26.319 --> 01:48:29.920
going to develop Thistlehoe States is there was a road

01:48:29.920 --> 01:48:30.600
straight through

01:48:30.600 --> 01:48:33.779
Thistlehoe States all the way over to Hickory Creek and

01:48:33.779 --> 01:48:34.840
somewhere along the

01:48:34.840 --> 01:48:40.649
line that disappeared and I presume that this out in the

01:48:40.649 --> 01:48:40.960
back of this

01:48:40.960 --> 01:48:43.930
development is part of what was originally planned because

01:48:43.930 --> 01:48:44.199
that

01:48:44.199 --> 01:48:48.439
basically would go straight through but now they've turned

01:48:48.439 --> 01:48:50.640
the road into that's

01:48:50.640 --> 01:48:55.439
where all the trees are. Well your concerns have certainly

01:48:55.439 --> 01:48:56.079
been noted by

01:48:56.079 --> 01:48:58.920
city to make sure we look at the roads and the utilities.

01:48:58.920 --> 01:48:59.960
Commissioner Beck.

01:48:59.960 --> 01:49:06.050
Thank you Chair. Was it Hyrick? Hyatt? Hyatt? Hyatt-Lynk.

01:49:06.050 --> 01:49:11.359
Hyatt-Lynk. Okay thank you. I empathize with your

01:49:11.359 --> 01:49:15.539
concern about the traffic and then when we discuss the

01:49:15.539 --> 01:49:17.000
preliminary and the

01:49:17.000 --> 01:49:20.180
final plan that was a big issue with a lot of people how

01:49:20.180 --> 01:49:21.279
unfortunately sometimes

01:49:21.279 --> 01:49:23.739
we seem to put the horse before the carriage when it comes

01:49:23.739 --> 01:49:24.560
to developing and

01:49:24.560 --> 01:49:27.949
then put the roads in so I do empathize with you I wish it

01:49:27.949 --> 01:49:30.239
wasn't that way but

01:49:30.239 --> 01:49:32.989
what we're hearing now is there is some movement on

01:49:32.989 --> 01:49:34.520
expanding Bryan Road it'll

01:49:34.520 --> 01:49:37.359
be four lanes two lanes each way and I believe we'll have a

01:49:37.359 --> 01:49:39.039
medium in it as far

01:49:39.039 --> 01:49:42.800
as north-south roads go that depends on what's developed I

01:49:42.800 --> 01:49:43.640
understand if you go

01:49:43.640 --> 01:49:47.239
further on up you you get that kind of access going through

01:49:47.239 --> 01:49:48.479
Forest Ridge so

01:49:48.479 --> 01:49:53.590
those streets connect you to a northerly route as opposed

01:49:53.590 --> 01:49:55.159
to going all the way to

01:49:55.159 --> 01:49:58.630
the east for Teasley and all the way to the west so but we

01:49:58.630 --> 01:49:59.680
do empathize with you

01:49:59.680 --> 01:50:03.880
and I think every time these kind of developments come up

01:50:03.880 --> 01:50:05.920
most of some P&Z

01:50:05.920 --> 01:50:09.279
if not all of us are always kind of you know encouraging

01:50:09.279 --> 01:50:10.560
staff to be aware of

01:50:10.560 --> 01:50:13.430
the traffic conditions that they create when we do these

01:50:13.430 --> 01:50:14.720
kind of developments so

01:50:14.720 --> 01:50:17.409
and like I said I have no problem with developing

01:50:17.409 --> 01:50:19.119
developments like that but I

01:50:19.119 --> 01:50:21.899
think the city needs to take into consideration that they

01:50:21.899 --> 01:50:22.760
need to provide

01:50:22.760 --> 01:50:27.140
for some roads in the future I agree you're going they put

01:50:27.140 --> 01:50:27.760
all these drones

01:50:27.760 --> 01:50:32.119
side by side it's never gonna happen and that's on records

01:50:32.119 --> 01:50:33.079
on public record

01:50:33.079 --> 01:50:36.779
thanks and also where is the land going to come to why to

01:50:36.779 --> 01:50:37.840
widen Ryan River is

01:50:37.840 --> 01:50:41.100
it going to come off of our side of the street or the other

01:50:41.100 --> 01:50:41.359
side of it couldn't

01:50:41.359 --> 01:50:47.920
for you specifically but it's there it's there thank you

01:50:47.920 --> 01:50:47.920
sir

01:50:48.479 --> 01:50:53.439
is there anyone else who'd like to speak on this item more

01:50:53.439 --> 01:50:55.279
welcome to step on

01:50:55.279 --> 01:50:58.069
down once you're done speaking if you just fill out a blue

01:50:58.069 --> 01:50:59.239
card and then when

01:50:59.239 --> 01:51:03.680
he gets the mic state your name and mail-in address for the

01:51:03.680 --> 01:51:05.840
record my name

01:51:05.840 --> 01:51:11.949
is Betsy Casante I'm at 3933 Andrew Avenue regarding the P&

01:51:11.949 --> 01:51:14.359
Z agreement can

01:51:14.359 --> 01:51:19.199
you have explanation of what was previously approved versus

01:51:19.199 --> 01:51:19.920
what the

01:51:19.920 --> 01:51:23.609
discussions are today when it comes to the EDU's the lot

01:51:23.609 --> 01:51:24.800
size the home square

01:51:24.800 --> 01:51:30.460
footage for that particular area and then also regarding

01:51:30.460 --> 01:51:33.479
the trees so I am my

01:51:33.479 --> 01:51:36.449
house is to the back of the development that's going on

01:51:36.449 --> 01:51:38.279
orange temporary fences

01:51:38.279 --> 01:51:41.460
is kind of going to where it looks like maybe sidewalk

01:51:41.460 --> 01:51:42.760
material might be put

01:51:42.760 --> 01:51:45.229
down so I just would like to know what the orange temporary

01:51:45.229 --> 01:51:47.960
fence is meant for

01:51:51.760 --> 01:51:56.449
and then regarding the RD 5x current versus the NR3

01:51:56.449 --> 01:51:59.199
proposed that was up on

01:51:59.199 --> 01:52:03.260
the screen earlier a little explanation behind what those

01:52:03.260 --> 01:52:05.000
two mean from current

01:52:05.000 --> 01:52:09.039
to proposed and how that is affecting any changes that are

01:52:09.039 --> 01:52:10.359
going on right now

01:52:10.479 --> 01:52:13.960
yeah we can definitely get those answers the first one can

01:52:13.960 --> 01:52:15.960
I invite Cindy back up

01:52:15.960 --> 01:52:20.800
she mentioned an original approved to any changes was there

01:52:20.800 --> 01:52:22.039
anything previously

01:52:22.039 --> 01:52:26.159
approved on this property that was altered or changed

01:52:26.159 --> 01:52:27.279
coming forth today

01:52:27.279 --> 01:52:32.710
no this this property was not in the city previously when

01:52:32.710 --> 01:52:34.640
this before this

01:52:34.640 --> 01:52:38.069
started in 2016 the property actually had a non annexation

01:52:38.069 --> 01:52:38.920
agreement on it

01:52:38.920 --> 01:52:42.890
and there there were no previous agreements for what would

01:52:42.890 --> 01:52:43.800
be on there it

01:52:43.800 --> 01:52:47.880
had no zoning quite frankly until this is approved by

01:52:47.880 --> 01:52:48.640
council it still

01:52:48.640 --> 01:52:52.220
technically has no zoning the record the request about the

01:52:52.220 --> 01:52:53.420
RD 5x that's what we

01:52:53.420 --> 01:52:57.229
call a holding zoning we put the X after it to indicate

01:52:57.229 --> 01:52:58.880
that this is not it's a

01:52:58.880 --> 01:53:02.420
holding zoning it's not what the property is zoned it just

01:53:02.420 --> 01:53:03.079
if the

01:53:03.079 --> 01:53:09.439
property owner decides they want to develop without the

01:53:09.439 --> 01:53:11.520
benefit of zoning

01:53:11.520 --> 01:53:15.680
that they are restricted to whatever is permitted in the RD

01:53:15.680 --> 01:53:18.600
5 district and then

01:53:18.600 --> 01:53:21.119
are you aware or maybe mr. Fletcher be aware of any

01:53:21.119 --> 01:53:23.239
temporary fencing put up is

01:53:23.239 --> 01:53:26.420
there a sidewalk being constructed or can you speak to what

01:53:26.420 --> 01:53:27.359
those fences are

01:53:27.359 --> 01:53:31.079
glen orange the orange fencing that's protective fencing

01:53:31.079 --> 01:53:34.279
around trees and I

01:53:34.279 --> 01:53:40.239
can speak to that but the rest I can't yeah the the

01:53:40.239 --> 01:53:41.319
existing orange orange

01:53:41.319 --> 01:53:44.270
fencing is tree protection fencing but as part of the

01:53:44.270 --> 01:53:45.720
concept plan and part of

01:53:45.720 --> 01:53:49.239
what's been approved there will be a sidewalk that meanders

01:53:49.239 --> 01:53:50.000
through the trees

01:53:50.000 --> 01:53:53.930
one of the discussions during the early stages of the

01:53:53.930 --> 01:53:55.760
project was hey how can we

01:53:55.760 --> 01:53:59.050
how can we kind of incorporate this nice open areas let's

01:53:59.050 --> 01:54:00.119
do a nice meandering

01:54:00.119 --> 01:54:03.300
trail there's a lot of topography we've got open spaces

01:54:03.300 --> 01:54:04.880
that have trails that

01:54:04.880 --> 01:54:08.409
come up into those treat areas though there will be a

01:54:08.409 --> 01:54:09.920
sidewalk a concrete

01:54:09.920 --> 01:54:13.300
sidewalk that's constructed that will meander through there

01:54:13.300 --> 01:54:14.199
to the north and

01:54:14.199 --> 01:54:17.829
then it'll come down and and tie into the sidewalk that's

01:54:17.829 --> 01:54:19.000
on the street right

01:54:19.000 --> 01:54:22.289
there at the entry where the entry tees the sidewalk that's

01:54:22.289 --> 01:54:23.600
in the open space is

01:54:23.600 --> 01:54:27.039
is let me

01:54:34.399 --> 01:54:37.380
so right here through the middle there is a open space lot

01:54:37.380 --> 01:54:40.079
and that open space

01:54:40.079 --> 01:54:42.949
lot is there because there used to be a gas well on the

01:54:42.949 --> 01:54:44.319
site and as part of this

01:54:44.319 --> 01:54:48.659
development we coordinated and negotiated with the gas well

01:54:48.659 --> 01:54:49.399
operator

01:54:49.399 --> 01:54:53.500
purchased the the rights to the gas well had them cap it so

01:54:53.500 --> 01:54:55.079
that's another thing

01:54:55.079 --> 01:54:58.060
that was within the agreement I didn't mention early

01:54:58.060 --> 01:54:59.359
earlier but from this

01:54:59.359 --> 01:55:02.960
point here to the north that is where the sidewalk meanders

01:55:02.960 --> 01:55:04.119
through the trees

01:55:04.119 --> 01:55:09.550
from that point to the south it goes along it goes along

01:55:09.550 --> 01:55:11.760
the the curb or it's

01:55:11.760 --> 01:55:14.939
within the parkway in the normal location adjacent to the

01:55:14.939 --> 01:55:15.760
right of way and

01:55:15.760 --> 01:55:18.369
that had to do more with topography and width it's a little

01:55:18.369 --> 01:55:19.199
bit more reduced

01:55:19.199 --> 01:55:21.859
width and you had a little more topography but there will

01:55:21.859 --> 01:55:22.680
be a sidewalk

01:55:22.680 --> 01:55:26.640
through that portion of the open space perfect thank you

01:55:26.640 --> 01:55:33.590
Mr. Preneta to her question about the lot sizes so we have

01:55:33.590 --> 01:55:35.560
a two just to the

01:55:35.560 --> 01:55:37.739
north of this and a four to the south of this so these lot

01:55:37.739 --> 01:55:38.840
sizes will be kind of

01:55:38.840 --> 01:55:43.920
an intermediary size between what's above and below correct

01:55:43.920 --> 01:55:44.439
say that again I'm

01:55:44.439 --> 01:55:48.020
sorry she was asking about the lot sizes so based on what

01:55:48.020 --> 01:55:49.520
we're seeing there's a

01:55:49.520 --> 01:55:53.630
in our two to the north and our four to the south so these

01:55:53.630 --> 01:55:55.079
lot sizes for her

01:55:55.079 --> 01:55:59.069
visual would be kind of somewhere between kind of a that's

01:55:59.069 --> 01:56:00.159
correct I mean I

01:56:00.159 --> 01:56:03.380
would say that the southern part of Thistle Hill is the

01:56:03.380 --> 01:56:04.399
size of the lots

01:56:04.399 --> 01:56:07.789
themselves if you look at Thistle Hill as a whole on an

01:56:07.789 --> 01:56:09.279
aerial there's really

01:56:09.279 --> 01:56:12.890
no open space everything is put into the lots there's an

01:56:12.890 --> 01:56:14.380
open lot that's on the

01:56:14.380 --> 01:56:17.600
south end that's utilized for detention so our lots are

01:56:17.600 --> 01:56:19.039
more consistent probably

01:56:19.039 --> 01:56:21.750
in size or more similar in size with the southern portion

01:56:21.750 --> 01:56:23.159
of Thistle Hill but

01:56:23.159 --> 01:56:26.600
what we did is we took all that additional area and we

01:56:26.600 --> 01:56:27.680
preserved it in

01:56:27.680 --> 01:56:31.210
our open space so we have a much larger preservation area

01:56:31.210 --> 01:56:32.319
but the lots to the

01:56:32.319 --> 01:56:35.500
north there's if there are lots that are currently on sept

01:56:35.500 --> 01:56:36.760
ic generally that's a

01:56:36.760 --> 01:56:40.569
one acre lot or larger so that's going to be larger than

01:56:40.569 --> 01:56:41.960
what we've got here

01:56:41.960 --> 01:56:45.890
the lots that are just to our west that are the in our two

01:56:45.890 --> 01:56:47.479
section of Thistle

01:56:47.479 --> 01:56:50.250
Hill those are going to be larger the lots to the south

01:56:50.250 --> 01:56:51.359
that are in our four

01:56:51.359 --> 01:56:53.829
they're probably a little bit smaller but they're more

01:56:53.829 --> 01:56:55.560
comparable and then Ryan

01:56:55.560 --> 01:56:59.279
ranch that's to our south those are those lots are smaller

01:56:59.279 --> 01:57:00.359
than what we're

01:57:00.359 --> 01:57:03.189
proposing in the development so we're probably if you

01:57:03.189 --> 01:57:03.960
looked at the

01:57:03.960 --> 01:57:07.550
surrounding developments we're probably a mid-size lot

01:57:07.550 --> 01:57:09.000
compared to what's around

01:57:09.000 --> 01:57:15.239
us thank you very much thank you and miss Casante just as a

01:57:15.239 --> 01:57:16.039
follow-up you had a

01:57:16.039 --> 01:57:20.840
couple questions about specifics about was approved and

01:57:20.840 --> 01:57:23.560
then the RDX RD 5x

01:57:23.560 --> 01:57:26.739
those can be really confusing and so if you have any more

01:57:26.739 --> 01:57:27.960
questions happy answer

01:57:27.960 --> 01:57:31.140
or Cindy can certainly offline talk to you about all the

01:57:31.140 --> 01:57:32.399
requirements that the

01:57:32.399 --> 01:57:36.329
new zoning would have on the property what about the

01:57:36.329 --> 01:57:37.159
minimum square footage of

01:57:37.159 --> 01:57:42.750
the homes being built let me look in the PADA it's it's it

01:57:42.750 --> 01:57:44.119
's within the PADA I

01:57:44.119 --> 01:57:48.739
think there's a I think the minimum is 18,000 and then we

01:57:48.739 --> 01:57:48.960
have to order

01:57:48.960 --> 01:57:57.000
I'm sorry 1800 the home price would not be 350 I had

01:57:57.000 --> 01:57:58.880
another just keep you on

01:57:58.880 --> 01:58:08.600
your toes and then 45% are 2400 square feet and on the

01:58:08.600 --> 01:58:10.640
minimum lot size the the

01:58:10.640 --> 01:58:16.239
PDA specifies 7200 square feet okay yeah that would be 60

01:58:16.239 --> 01:58:17.720
by 120 I think I may

01:58:17.720 --> 01:58:24.279
have must spoke then if I think I said 60 by 130 thank you

01:58:24.279 --> 01:58:25.960
for the correction

01:58:27.359 --> 01:58:30.939
wouldn't yes please step forward again if you just fill out

01:58:30.939 --> 01:58:32.319
a blue card state

01:58:32.319 --> 01:58:35.300
your name and address for the record my name is Ken

01:58:35.300 --> 01:58:37.520
Benjamin I live at 1009

01:58:37.520 --> 01:58:41.949
Stoneway Drive on the south side of the deal I need to ask

01:58:41.949 --> 01:58:42.960
him about the he was

01:58:42.960 --> 01:58:46.750
putting a walkway around the property and he was showing

01:58:46.750 --> 01:58:47.960
one side I wanted to

01:58:47.960 --> 01:58:51.199
know about on the south side

01:58:59.159 --> 01:59:03.350
I live down here in this far corner down here there's there

01:59:03.350 --> 01:59:03.840
gonna be a walkway

01:59:03.840 --> 01:59:09.489
coming through this set of trees so is there gonna be fence

01:59:09.489 --> 01:59:11.720
line or a stuff

01:59:11.720 --> 01:59:15.649
fence going through there to block off a property or is it

01:59:15.649 --> 01:59:15.920
gonna be open no

01:59:15.920 --> 01:59:19.569
there so each individual lot will have the builder fence on

01:59:19.569 --> 01:59:20.720
the backside of the

01:59:20.720 --> 01:59:26.359
lot so with the open spaces I believe in the PDA all the

01:59:26.359 --> 01:59:27.560
lots that back to the

01:59:27.560 --> 01:59:31.090
open space have a wrought iron or tubular steel fence so

01:59:31.090 --> 01:59:32.239
that that because

01:59:32.239 --> 01:59:35.850
you've got that nice 80-foot buffer along that south end

01:59:35.850 --> 01:59:36.800
with those trees

01:59:36.800 --> 01:59:40.090
there will be fences but they're gonna be offset from the

01:59:40.090 --> 01:59:41.279
development to the

01:59:41.279 --> 01:59:44.890
south along the builder lots so that the views of those

01:59:44.890 --> 01:59:46.920
existing trees enjoyed

01:59:46.920 --> 01:59:49.760
hate to interrupt can you raise that sheet just a little

01:59:49.760 --> 01:59:50.640
bit and point to

01:59:50.640 --> 01:59:54.920
where you're specifically speaking of so down here in Ryan

01:59:54.920 --> 01:59:56.920
wrench he's asking if

01:59:56.920 --> 01:59:59.479
there's going to be a fence so if you look at the clearing

01:59:59.479 --> 02:00:00.399
area so basically

02:00:00.399 --> 02:00:05.840
what we did you can see the lots superimposed on the aerial

02:00:05.840 --> 02:00:06.600
and you can

02:00:06.600 --> 02:00:09.819
see that there's probably about 10 feet of clearing just

02:00:09.819 --> 02:00:11.159
past the lot line and

02:00:11.159 --> 02:00:14.659
that was for building retaining walls drainage wells and so

02:00:14.659 --> 02:00:15.439
forth to make

02:00:15.439 --> 02:00:18.779
everything work from an engineering standpoint these lots

02:00:18.779 --> 02:00:20.199
will have fences

02:00:20.199 --> 02:00:24.899
on them I believe in the PDA because they're backing to in

02:00:24.899 --> 02:00:26.560
the PDA was done

02:00:26.560 --> 02:00:30.000
back in 2016 so it's been a while since I've looked at it

02:00:30.000 --> 02:00:31.279
real closely in the

02:00:31.279 --> 02:00:34.979
exhibit but we had exhibits that showed where wrought iron

02:00:34.979 --> 02:00:35.619
or tubular steel

02:00:35.619 --> 02:00:39.550
fencing would have to be provided because of the open space

02:00:39.550 --> 02:00:40.479
and I believe

02:00:40.479 --> 02:00:44.199
all the open space lots if you back to an open space it's a

02:00:44.199 --> 02:00:44.880
it's a tubular

02:00:44.880 --> 02:00:49.020
steel fence so that you enjoy and get to to you know it's

02:00:49.020 --> 02:00:50.520
kind of creating that

02:00:50.520 --> 02:00:53.470
open space bring it into your backyard so there'll be a

02:00:53.470 --> 02:00:54.640
fence it's I believe

02:00:54.640 --> 02:00:57.539
it's likely to be a tubular steel fence that allows the

02:00:57.539 --> 02:00:58.800
view of the open space

02:00:58.800 --> 02:01:04.670
but this this separation along here with those trees there

02:01:04.670 --> 02:01:05.760
's not going to be any

02:01:05.760 --> 02:01:09.369
sidewalk and that is just going to remain a preservation

02:01:09.369 --> 02:01:10.520
area okay that's

02:01:10.520 --> 02:01:17.289
what I'm the sanitary sewer does come down and connect on

02:01:17.289 --> 02:01:18.399
this corner right

02:01:18.399 --> 02:01:22.439
but there's nothing along this back perimeter area yeah I

02:01:22.439 --> 02:01:22.840
was I was

02:01:22.840 --> 02:01:25.300
concerned with that so we wouldn't have to build a bigger

02:01:25.300 --> 02:01:26.039
fence in our backyard

02:01:26.039 --> 02:01:30.359
so we could enjoy these trees too right so okay what's the

02:01:30.359 --> 02:01:31.359
deal with the they

02:01:31.359 --> 02:01:34.840
gonna do anything with the pond the pond is to remain and

02:01:34.840 --> 02:01:36.279
there's a budget to put

02:01:36.279 --> 02:01:40.640
a fountain in it so they'll they'll once the development

02:01:40.640 --> 02:01:41.399
gets finished and they

02:01:41.399 --> 02:01:44.840
come in and start doing the the landscape and hardscape and

02:01:44.840 --> 02:01:45.420
amenity

02:01:45.420 --> 02:01:48.939
package there will be a fountain placed in the in the pod

02:01:48.939 --> 02:01:50.279
to aerate it and have

02:01:50.279 --> 02:01:56.239
it as a amenity to the development okay thanks thank you of

02:01:56.239 --> 02:01:56.880
course thank you

02:01:56.880 --> 02:02:01.210
mr. Fletcher more than welcome to come forward if you could

02:02:01.210 --> 02:02:02.319
just fill out a

02:02:02.319 --> 02:02:06.479
card set your name and address for the record Tracy Jenkins

02:02:06.479 --> 02:02:07.979
I lit 801 day

02:02:07.979 --> 02:02:11.560
spring and I have a question about the road that's coming

02:02:11.560 --> 02:02:12.920
through connecting to

02:02:12.920 --> 02:02:35.420
creak down so the track when Ryan ranch and when this will

02:02:35.420 --> 02:02:35.880
hill develop there

02:02:35.880 --> 02:02:39.239
was a 80 foot wide spike strip through there kind of

02:02:39.239 --> 02:02:41.920
created a flag lot and so

02:02:41.920 --> 02:02:45.500
the roadway that's going to be constructed it'll be the to

02:02:45.500 --> 02:02:46.119
the city

02:02:46.119 --> 02:02:50.050
standard it'll be a typical concrete curb and gutter road

02:02:50.050 --> 02:02:51.680
way if you so close

02:02:51.680 --> 02:02:55.939
we can turn the mic walking down where is Creekdale Creek

02:02:55.939 --> 02:02:57.479
dale is just here it's

02:02:57.479 --> 02:03:01.239
running across here east-west

02:03:02.199 --> 02:03:16.279
yeah I because it comes out do you have on your

02:03:16.279 --> 02:03:17.199
presentation so it's gonna come

02:03:17.199 --> 02:03:20.720
out here correct and dead end so you're gonna have all

02:03:20.720 --> 02:03:21.680
those people cutting

02:03:21.680 --> 02:03:25.149
through to a dead end and then they're gonna take a left

02:03:25.149 --> 02:03:26.359
and then be taken

02:03:26.359 --> 02:03:30.619
right all going down there well the traffic impact analysis

02:03:30.619 --> 02:03:31.279
has been done

02:03:31.279 --> 02:03:35.270
and we've looked at the traffic patterns most traffic will

02:03:35.270 --> 02:03:36.680
actually go to Ryan

02:03:36.680 --> 02:03:41.369
and then go east with a small percentage going west so even

02:03:41.369 --> 02:03:42.199
though the

02:03:42.199 --> 02:03:46.729
connections there because of the access because of the

02:03:46.729 --> 02:03:48.319
route to get I mean you

02:03:48.319 --> 02:03:51.180
may have you you certainly can't have traffic people are

02:03:51.180 --> 02:03:52.119
gonna typically

02:03:52.119 --> 02:03:56.649
choose the quickest route but you it does have connectivity

02:03:56.649 --> 02:03:58.319
to Creekdale where

02:03:58.319 --> 02:04:01.500
they can turn right and or turn left and then do a right

02:04:01.500 --> 02:04:03.180
and then go down to is

02:04:03.180 --> 02:04:05.960
it Hickory Creek or

02:04:05.960 --> 02:04:09.640
I think I'm trying right in Creekdale or that Creekdale

02:04:09.640 --> 02:04:11.600
area specifically no so

02:04:11.600 --> 02:04:15.180
Creekdale across our frontage is already improved Creekdale

02:04:15.180 --> 02:04:15.840
on the city's

02:04:15.840 --> 02:04:20.029
mobility plan is a collector roadway which is a 65 foot

02:04:20.029 --> 02:04:21.439
right of way at the

02:04:21.439 --> 02:04:24.319
time it was a 37 foot back-to-back roadway the city's

02:04:24.319 --> 02:04:25.079
updated their

02:04:25.079 --> 02:04:29.010
standards so new collectors would be I believe 39 or 41

02:04:29.010 --> 02:04:30.840
foot back-to-back but

02:04:30.840 --> 02:04:34.020
because it's improved in front of our frontage there's this

02:04:34.020 --> 02:04:34.800
tract has no

02:04:34.800 --> 02:04:39.159
obligation there's no improvements to the to the to Creek

02:04:39.159 --> 02:04:40.960
dale down here as

02:04:40.960 --> 02:04:44.890
these other tracks develop or if there is a city initiated

02:04:44.890 --> 02:04:45.920
project then

02:04:45.920 --> 02:04:49.500
Creekdale would eventually extend to the east and connect

02:04:49.500 --> 02:04:51.279
to where it's currently

02:04:51.279 --> 02:04:54.920
stopped with the I believe it's forest Meadows project but

02:04:54.920 --> 02:04:55.600
it may be a

02:04:55.600 --> 02:04:59.260
different subdivision but there is a gap currently right

02:04:59.260 --> 02:05:00.220
now that is

02:05:00.220 --> 02:05:03.829
undeveloped a portion of Creekdale and generally that would

02:05:03.829 --> 02:05:04.279
occur with

02:05:04.279 --> 02:05:08.800
development of those of those tracks of land

02:05:11.800 --> 02:05:16.079
I mean all the people that cut through thistle hills now

02:05:16.079 --> 02:05:17.800
you have all of them

02:05:17.800 --> 02:05:23.020
coming down where it dead ends around the corner 90 degrees

02:05:23.020 --> 02:05:24.199
and then you're

02:05:24.199 --> 02:05:27.720
gonna have all these people come into a T basically trying

02:05:27.720 --> 02:05:28.840
to cut around and

02:05:28.840 --> 02:05:32.949
sneak around and take a right down I don't know what the

02:05:32.949 --> 02:05:33.880
name of that road is

02:05:33.880 --> 02:05:39.029
down River Pass yeah down River Pass and I'm not sure if

02:05:39.029 --> 02:05:41.560
River Pass is a collector or not it looks it

02:05:41.560 --> 02:05:45.489
appears to be a big road I mean it's it can handle it but

02:05:45.489 --> 02:05:46.600
that that little

02:05:46.600 --> 02:05:49.899
intersection right there is gonna be well Creekdale should

02:05:49.899 --> 02:05:51.039
be constructed as

02:05:51.039 --> 02:05:54.300
a collector so it should be 37 foot back-to-back which

02:05:54.300 --> 02:05:55.600
which generally a

02:05:55.600 --> 02:06:00.710
collector allows about typically 10,000 to 12,000 vehicles

02:06:00.710 --> 02:06:02.520
per day so both

02:06:02.520 --> 02:06:09.119
Creekdale and River Pass are currently collectors I'm

02:06:09.119 --> 02:06:11.840
worried about that intersection and everyone trying to cut

02:06:11.840 --> 02:06:16.319
through there and then be trying to take that corner

02:06:16.319 --> 02:06:21.909
I'm gonna interject here Ms. Jenkins I think all your your

02:06:21.909 --> 02:06:23.439
points are valid for

02:06:23.439 --> 02:06:26.640
the sake of the audience I would ask if there's a sidebar

02:06:26.640 --> 02:06:27.319
conversation Mr.

02:06:27.319 --> 02:06:29.859
Fletcher if you could hang out right after the item that'd

02:06:29.859 --> 02:06:30.840
be helpful I want

02:06:30.840 --> 02:06:34.920
to remind everyone here that this the plat is actually

02:06:34.920 --> 02:06:36.439
finalized that the

02:06:36.439 --> 02:06:40.619
road structure everything is has been approved by the city

02:06:40.619 --> 02:06:41.880
and so any impact

02:06:41.880 --> 02:06:45.810
to traffic is being assessed now and road improvements will

02:06:45.810 --> 02:06:46.840
be made from a city

02:06:46.840 --> 02:06:49.319
perspective on Ryan or Creekdale or however it's being

02:06:49.319 --> 02:06:50.319
impacted by the city

02:06:50.319 --> 02:06:52.779
what we're looking at specifically tonight is to go ahead

02:06:52.779 --> 02:06:53.399
and approve the

02:06:53.399 --> 02:06:57.750
actual zoning to go forward the project we're unable to

02:06:57.750 --> 02:06:59.560
look at a redirection of

02:06:59.560 --> 02:07:03.170
roads or or the actual platting that's been finalized by

02:07:03.170 --> 02:07:06.119
the city at this point

02:07:09.439 --> 02:07:14.659
with that said if anyone has anything about the zoning or

02:07:14.659 --> 02:07:16.199
density be happy to

02:07:16.199 --> 02:07:23.159
answer those those inquiries sir typically we have one

02:07:23.159 --> 02:07:24.640
allocation to speak

02:07:24.640 --> 02:07:28.880
if you'd like to come down that's one more question I'll

02:07:28.880 --> 02:07:35.920
allow it I just didn't

02:07:35.920 --> 02:07:38.460
get one of my questions answered from earlier is what

02:07:38.460 --> 02:07:39.520
happened to the road

02:07:39.520 --> 02:07:42.409
that was originally shown cutting all the way through which

02:07:42.409 --> 02:07:43.279
is what they were

02:07:43.279 --> 02:07:47.960
just talking about and they left they left that part on the

02:07:47.960 --> 02:07:48.359
back of the

02:07:48.359 --> 02:07:51.539
property and originally there was a road going all the way

02:07:51.539 --> 02:07:51.960
through on some

02:07:51.960 --> 02:07:56.020
plats I saw along not plats but I think they were just city

02:07:56.020 --> 02:07:57.399
projection drawings

02:07:57.399 --> 02:08:02.270
or something I can't speak to any concept plans what I know

02:08:02.270 --> 02:08:03.279
is the plenary plat

02:08:03.279 --> 02:08:05.750
that went through this Commission as well as the final plat

02:08:05.750 --> 02:08:06.399
had the the

02:08:06.399 --> 02:08:09.119
mazing of the road so I'm not sure if there's a concept

02:08:09.119 --> 02:08:10.199
planned in the past

02:08:10.199 --> 02:08:13.399
that certainly wasn't brought forward to the plotting stage

02:08:13.399 --> 02:08:14.800
and if Cindy you have

02:08:14.800 --> 02:08:18.199
any context to that I just like to say I think you need to

02:08:18.199 --> 02:08:18.920
take into

02:08:18.920 --> 02:08:21.539
consideration that it is going to be dangerous because

02:08:21.539 --> 02:08:22.560
people will be cutting

02:08:22.560 --> 02:08:25.739
through there everybody I know cuts through this all of the

02:08:25.739 --> 02:08:26.720
states now and

02:08:26.720 --> 02:08:29.600
it's it's a maze to get through there but everybody does it

02:08:29.600 --> 02:08:31.119
because otherwise

02:08:31.119 --> 02:08:33.899
you drive three or four miles out of your way understood so

02:08:33.899 --> 02:08:34.720
I think it's a

02:08:34.720 --> 02:08:39.079
problem needs to be the applicant in his presentation

02:08:39.079 --> 02:08:40.600
stated that the city asked

02:08:40.600 --> 02:08:44.649
him not to put a straight through because it could turn

02:08:44.649 --> 02:08:45.920
into a raceway to

02:08:45.920 --> 02:08:49.600
be honest with you we we asked to have it meander so that

02:08:49.600 --> 02:08:51.119
it couldn't gotcha

02:08:51.119 --> 02:09:05.680
thank you Cindy is this going to be an HOA and who's going

02:09:05.680 --> 02:09:06.479
to maintain these

02:09:06.479 --> 02:09:11.279
green belt areas and also the gas line running down is it

02:09:11.279 --> 02:09:13.000
still live or is it

02:09:13.000 --> 02:09:15.550
not the gas well they can't about the big major gas line

02:09:15.550 --> 02:09:16.800
that runs down along

02:09:16.800 --> 02:09:21.359
the west side over there I lost the applicant answer the

02:09:21.359 --> 02:09:22.000
first question

02:09:22.000 --> 02:09:25.630
there will be an HOA and the HOA will be responsible for

02:09:25.630 --> 02:09:26.880
maintaining all the open

02:09:26.880 --> 02:09:31.859
spaces second question the gas line is that is a gathering

02:09:31.859 --> 02:09:33.319
line that my

02:09:33.319 --> 02:09:37.050
understanding is that line is servicing several wells in

02:09:37.050 --> 02:09:38.399
the area and that line

02:09:38.399 --> 02:09:42.079
is active and it will remain so it runs along the western

02:09:42.079 --> 02:09:43.479
edge of the property

02:09:43.479 --> 02:09:46.970
and then turns back to the east on the on the north end

02:09:46.970 --> 02:09:48.359
just south of the of

02:09:48.359 --> 02:09:53.960
the right of way of Ryan Road thank you

02:09:54.520 --> 02:09:59.640
anyone else like to speak on this item well thank you

02:09:59.640 --> 02:10:01.199
everyone who was able to

02:10:01.199 --> 02:10:04.069
speak I'll go ahead and close the public session and open

02:10:04.069 --> 02:10:04.920
it to the commission

02:10:04.920 --> 02:10:08.079
for discussion or motion

02:10:14.479 --> 02:10:16.949
Commissioner Beck thank you chair and thank every one of

02:10:16.949 --> 02:10:19.600
you for coming out

02:10:19.600 --> 02:10:21.810
and speaking on this tonight we know this is important to

02:10:21.810 --> 02:10:22.319
you and as I

02:10:22.319 --> 02:10:27.260
mentioned to mr. highly I hope I said that right earlier we

02:10:27.260 --> 02:10:28.920
empathize with the

02:10:28.920 --> 02:10:33.770
impact that more homes in the area more cars and like you

02:10:33.770 --> 02:10:35.319
we wish that they

02:10:35.319 --> 02:10:35.319
would put the car before the horse but this is a

02:10:35.319 --> 02:10:41.960
development that that fits this

02:10:41.960 --> 02:10:46.840
area it's the city's growing it needs homes and needs homes

02:10:46.840 --> 02:10:49.199
of this nature so

02:10:49.199 --> 02:10:55.039
it's hard to negate what what's being provided here the

02:10:55.039 --> 02:10:56.600
thing is when you move

02:10:56.600 --> 02:10:59.779
into an area the first ones there it's always rough when

02:10:59.779 --> 02:11:01.239
new people come in and

02:11:01.239 --> 02:11:04.649
it changes and alters the patterns that you're used to so

02:11:04.649 --> 02:11:05.840
but I think in time

02:11:05.840 --> 02:11:08.300
you'll get used to it the roads hopefully will get fixed a

02:11:08.300 --> 02:11:08.760
lot quicker

02:11:08.760 --> 02:11:15.010
than we all would like to see them get fixed so I think in

02:11:15.010 --> 02:11:16.279
the long run this

02:11:16.279 --> 02:11:20.279
will be a positive development for you and with that said I

02:11:20.279 --> 02:11:21.159
'd like to make a

02:11:21.159 --> 02:11:27.279
motion to approve is the 18 oh oh 208

02:11:27.520 --> 02:11:30.760
mr. Cole

02:11:32.439 --> 02:11:36.960
second perfect thank you we have a first and second is

02:11:36.960 --> 02:11:38.840
there any discussion

02:11:38.840 --> 02:11:43.039
pressure Alice thank you chair I just I think this

02:11:43.039 --> 02:11:45.399
development as Commissioner

02:11:45.399 --> 02:11:48.699
Beck said does fit the area it's also brought about great

02:11:48.699 --> 02:11:49.920
discussion and thank

02:11:49.920 --> 02:11:53.010
you all for sharing your your thoughts and concerns and and

02:11:53.010 --> 02:11:53.880
and all along the

02:11:53.880 --> 02:11:59.729
way there's was an atypical development process for all of

02:11:59.729 --> 02:12:01.680
us but it has brought

02:12:01.680 --> 02:12:06.109
forth some discussion within staff it's brought about new

02:12:06.109 --> 02:12:07.840
process for looking at

02:12:07.840 --> 02:12:14.279
roads so all of that is is a definite positive thing thank

02:12:14.279 --> 02:12:15.560
you mr. Ellis

02:12:15.560 --> 02:12:18.149
before I call for but I just want to say and echo

02:12:18.149 --> 02:12:19.960
commissioner Ellis's points

02:12:19.960 --> 02:12:23.890
this is a very unique situation in which the order was kind

02:12:23.890 --> 02:12:25.159
of reversed and so I

02:12:25.159 --> 02:12:28.359
appreciate everyone's patience and trying to understand

02:12:28.359 --> 02:12:29.199
that as well as

02:12:29.199 --> 02:12:33.329
understand the the applicants property and agenda coming

02:12:33.329 --> 02:12:34.239
through I can see

02:12:34.239 --> 02:12:37.550
personally my younger brother lives in the neighborhood to

02:12:37.550 --> 02:12:38.119
the west just off

02:12:38.119 --> 02:12:41.920
Maggie's Meadow I live in Forest Ridge I take Ryan Road all

02:12:41.920 --> 02:12:42.399
the time and I

02:12:42.399 --> 02:12:45.720
understand the the impact that it potentially has and I

02:12:45.720 --> 02:12:46.880
certainly am an

02:12:46.880 --> 02:12:50.060
advocate to get Ryan Road more efficient in terms of

02:12:50.060 --> 02:12:51.960
managing traffic that being

02:12:51.960 --> 02:12:55.229
said the concessions made by the applicant to be annexed to

02:12:55.229 --> 02:12:56.000
come under the

02:12:56.000 --> 02:12:59.930
city to pay substantially more impact fees than would have

02:12:59.930 --> 02:13:01.079
been required as

02:13:01.079 --> 02:13:03.770
well as try to make the project as nice as possible I think

02:13:03.770 --> 02:13:04.760
is a good thing for

02:13:04.760 --> 02:13:09.460
the area and so I'm going ahead and vote for approval with

02:13:09.460 --> 02:13:10.840
this knowing and

02:13:10.840 --> 02:13:13.310
letting you know that I'm going to follow up on the the

02:13:13.310 --> 02:13:14.000
traffic impact in

02:13:14.000 --> 02:13:16.739
the roads going forward to make sure that congestion doesn

02:13:16.739 --> 02:13:17.600
't overtake that

02:13:17.600 --> 02:13:21.430
south part of town see another discussion I will call for a

02:13:21.430 --> 02:13:21.720
vote on the

02:13:21.720 --> 02:13:35.560
board motion carries six zero with one absent

02:13:38.119 --> 02:13:45.630
I'll move us to agenda item 3c which is a ESA 16 - 3 I'll

02:13:45.630 --> 02:13:46.319
call Haley for

02:13:46.319 --> 02:14:13.319
presentation and open the item for public hearing all right

02:14:13.319 --> 02:14:13.880
good evening

02:14:13.880 --> 02:14:19.100
this is item a ESA 16 - 3 for Country Club road estates so

02:14:19.100 --> 02:14:20.279
the request before

02:14:20.279 --> 02:14:23.460
you tonight is to hold this public hearing consider making

02:14:23.460 --> 02:14:24.159
a recommendation

02:14:24.159 --> 02:14:26.630
to the City Council regarding an alternative

02:14:26.630 --> 02:14:27.479
environmentally sensitive

02:14:27.479 --> 02:14:31.010
area plan the property in question is outlined in yellow on

02:14:31.010 --> 02:14:32.359
the map it's just

02:14:32.359 --> 02:14:35.640
over 35 acres total as you can see here it's located on the

02:14:35.640 --> 02:14:36.680
west side of country

02:14:36.680 --> 02:14:39.229
club I'm sorry the east side of Country Club Road south of

02:14:39.229 --> 02:14:40.760
Regency Court the

02:14:40.760 --> 02:14:44.189
particular type of ESA that is up for discussion tonight is

02:14:44.189 --> 02:14:45.039
the undeveloped

02:14:45.039 --> 02:14:48.220
floodplain ESA on this property there is also riparian

02:14:48.220 --> 02:14:49.600
buffer but as you'll see

02:14:49.600 --> 02:14:53.020
as we go through these slides that is not proposed to be

02:14:53.020 --> 02:14:54.399
impacted at this time

02:14:54.399 --> 02:14:58.329
it's also important to note that although we do have newly

02:14:58.329 --> 02:14:59.159
adopted ESA

02:14:59.159 --> 02:15:03.479
standards as of 2017 this particular application has been

02:15:03.479 --> 02:15:04.119
in the work since

02:15:04.119 --> 02:15:09.010
2016 so it predates that and would fall under the previous

02:15:09.010 --> 02:15:10.279
ESA regulations

02:15:10.279 --> 02:15:13.149
looking at the zoning for this property to give you a

02:15:13.149 --> 02:15:14.439
little bit of history

02:15:14.439 --> 02:15:18.640
prior to 2017 the property did have a split zoning of NR 2

02:15:18.640 --> 02:15:20.119
and NR 4 some of

02:15:20.119 --> 02:15:22.720
you may remember when this case came forward there was

02:15:22.720 --> 02:15:23.960
discussion over kind

02:15:23.960 --> 02:15:26.430
of balancing out the zoning to give a uniform density

02:15:26.430 --> 02:15:28.279
across the property so

02:15:28.279 --> 02:15:31.460
they did request a rezoning to NR 3 that was approved and

02:15:31.460 --> 02:15:32.640
although they they

02:15:32.640 --> 02:15:37.859
could have a maximum of 124 lots under this zoning the

02:15:37.859 --> 02:15:38.880
preliminary plot that

02:15:38.880 --> 02:15:42.609
was on your agenda earlier this evening reflected only 73

02:15:42.609 --> 02:15:44.399
lots so looking at

02:15:44.399 --> 02:15:47.640
that preliminary plot you can see kind of two phases of

02:15:47.640 --> 02:15:48.520
development proposed

02:15:48.520 --> 02:15:51.699
here the phase that's on the east side of the floodplain

02:15:51.699 --> 02:15:52.800
would be the first phase

02:15:52.800 --> 02:15:55.979
the second phase is kind of on hold if you will it's

02:15:55.979 --> 02:15:57.239
intended to occur but

02:15:57.239 --> 02:15:59.859
they're waiting to see how wide text dot intends to make

02:15:59.859 --> 02:16:00.800
Country Club Road

02:16:00.800 --> 02:16:04.380
eventually so with phase one we would have the extension of

02:16:04.380 --> 02:16:05.640
Meadowlands Drive

02:16:05.640 --> 02:16:08.300
into this property you can see the roads as we just

02:16:08.300 --> 02:16:10.079
discussed kind of meander to

02:16:10.079 --> 02:16:13.260
limit that direct cut through traffic from the subdivision

02:16:13.260 --> 02:16:15.000
to Country Club so

02:16:15.000 --> 02:16:17.159
the road would meander and at first there would be a

02:16:17.159 --> 02:16:18.279
temporary access point

02:16:18.279 --> 02:16:21.100
here on the north side where there's already an existing

02:16:21.100 --> 02:16:22.119
driveway over time

02:16:22.119 --> 02:16:25.300
as phase two develops that that would move further south to

02:16:25.300 --> 02:16:26.079
have one primary

02:16:26.079 --> 02:16:29.489
entrance off of Country Club Road as you can see here the E

02:16:29.489 --> 02:16:31.840
SA and the stream that

02:16:31.840 --> 02:16:34.309
runs through the property are contained entirely within

02:16:34.309 --> 02:16:35.479
lots 1x and 2x that you

02:16:35.479 --> 02:16:40.040
see here kind of in the central portion and I will call

02:16:40.040 --> 02:16:42.079
Deborah Vieira down to

02:16:42.079 --> 02:16:44.739
kind of walk you through the various types of ESA on the

02:16:44.739 --> 02:16:45.680
property and what

02:16:45.680 --> 02:16:49.399
these specific impacts would be

02:16:57.719 --> 02:17:00.629
good evening Commission my name is Deborah Vieira I'm with

02:17:00.629 --> 02:17:01.239
the Environmental

02:17:01.239 --> 02:17:06.659
Services before you tonight it is a consideration of an

02:17:06.659 --> 02:17:08.200
alternative ESA to

02:17:08.200 --> 02:17:12.559
encroach into the undeveloped floodplain which is color on

02:17:12.559 --> 02:17:17.040
the map as a blue just

02:17:17.040 --> 02:17:19.659
as a point of clarification even though there's a repair

02:17:19.659 --> 02:17:20.559
and buffing going

02:17:20.559 --> 02:17:23.409
through the middle of the floodplain no encroachment is

02:17:23.409 --> 02:17:25.200
proposed therefore that

02:17:25.200 --> 02:17:29.739
area is not included as a part of this alternative ESA plan

02:17:29.739 --> 02:17:31.920
in 2015 staff make

02:17:31.920 --> 02:17:36.459
a field assessment to assess the conditions of the repair

02:17:36.459 --> 02:17:37.680
and buffer and

02:17:37.680 --> 02:17:41.200
the floodplain on site it was found that the northern

02:17:41.200 --> 02:17:42.959
portion of the property

02:17:42.959 --> 02:17:47.180
have been heavily impacted by grading fill and removal of

02:17:47.180 --> 02:17:49.760
vegetation so due to

02:17:49.760 --> 02:17:53.079
that assessment we reclassify the northern portion of it as

02:17:53.079 --> 02:17:53.639
a developed

02:17:53.639 --> 02:17:57.389
and then we also remove the repair and buffer within that

02:17:57.389 --> 02:17:59.280
section the southern

02:17:59.280 --> 02:18:04.040
section stays as an undeveloped with a true repair and

02:18:04.040 --> 02:18:07.399
buffer the table here in

02:18:07.399 --> 02:18:11.719
front of you represents the different square footage of the

02:18:11.719 --> 02:18:12.639
areas and the

02:18:12.639 --> 02:18:17.340
disturbances that will be made to that area I just want to

02:18:17.340 --> 02:18:18.639
highlight that only

02:18:18.639 --> 02:18:22.629
the rows highlighted in yellow pertains to the scope of the

02:18:22.629 --> 02:18:24.000
alternative ESA

02:18:24.000 --> 02:18:27.090
plan the other information is additional information for

02:18:27.090 --> 02:18:28.079
you to understand the

02:18:28.079 --> 02:18:35.629
extent of the overall improvement in front of you is a

02:18:35.629 --> 02:18:38.180
detail that the

02:18:38.180 --> 02:18:41.430
applicant put together to explain where the field is going

02:18:41.430 --> 02:18:42.280
to be placed in

02:18:42.280 --> 02:18:46.360
relationship to the repair and buffer this area is where

02:18:46.360 --> 02:18:47.899
the field is going to

02:18:47.899 --> 02:18:52.719
be just to your attention the field is outside of the

02:18:52.719 --> 02:18:54.920
stream buffer maximum

02:18:54.920 --> 02:19:00.040
width which stops right here and what they're showing here

02:19:00.040 --> 02:19:01.280
that if by any

02:19:01.280 --> 02:19:03.979
chance there are trees would happen to be at the edge of

02:19:03.979 --> 02:19:05.120
the repair and buffer

02:19:05.120 --> 02:19:09.969
that proposed field will be pushed further out so in that

02:19:09.969 --> 02:19:11.319
way the root zone

02:19:11.319 --> 02:19:17.129
of the of those trees are protected here we are showing

02:19:17.129 --> 02:19:19.280
what the floodplain

02:19:19.280 --> 02:19:23.700
currently is based on FEMA maps and how the map is the

02:19:23.700 --> 02:19:25.520
floodplain is going to be

02:19:25.520 --> 02:19:31.120
after the after the reclamation work currently the unde

02:19:31.120 --> 02:19:32.440
veloped floodplain

02:19:32.440 --> 02:19:36.020
which is the southern half of the property is approximately

02:19:36.020 --> 02:19:38.120
300,000 square

02:19:38.120 --> 02:19:43.399
feet after the reclamation is done that footprints going to

02:19:43.399 --> 02:19:44.479
be reduced to

02:19:44.479 --> 02:19:47.659
hundred thirty nine thousand which is a different of

02:19:47.659 --> 02:19:48.840
approximately three point

02:19:48.840 --> 02:19:56.350
nine acres all together the applicant have proposed a

02:19:56.350 --> 02:19:58.000
series of mitigation to

02:19:58.000 --> 02:20:02.600
offset for the encroachment that they will be making on the

02:20:02.600 --> 02:20:03.200
undeveloped

02:20:03.200 --> 02:20:08.309
floodplain one of them is as we discussed is just to locate

02:20:08.309 --> 02:20:09.159
all feel

02:20:09.159 --> 02:20:13.090
outside the repair and buffer and on the outer edges of the

02:20:13.090 --> 02:20:14.479
existing drip lines

02:20:14.479 --> 02:20:19.899
for existing three sorry trees grading will be concentrated

02:20:19.899 --> 02:20:21.159
on the northern

02:20:21.159 --> 02:20:26.590
section of the lot where the floodplain is considered to be

02:20:26.590 --> 02:20:27.680
developed and having

02:20:27.680 --> 02:20:32.899
reduced ecological value and habitat value as well as where

02:20:32.899 --> 02:20:34.040
the repair and

02:20:34.040 --> 02:20:38.200
buffer has already been removed so they are trying to

02:20:38.200 --> 02:20:41.000
impact the less amount on

02:20:41.000 --> 02:20:45.379
the habitat that is further located further south the

02:20:45.379 --> 02:20:47.360
street layout minimizes

02:20:47.360 --> 02:20:50.139
the disturbances as that main corridor would be actually

02:20:50.139 --> 02:20:51.159
placed on the north

02:20:51.159 --> 02:20:55.500
side they are proposing to go in and remove invasive

02:20:55.500 --> 02:20:57.200
species present within

02:20:57.200 --> 02:21:00.469
the floodplain and repair and buffer and re vegetate we

02:21:00.469 --> 02:21:02.319
need a species we're not

02:21:02.319 --> 02:21:04.959
only talking about trees but we're also looking into herv

02:21:04.959 --> 02:21:07.639
aceous material and the

02:21:07.639 --> 02:21:12.290
channel that would be run through that spine will actually

02:21:12.290 --> 02:21:14.879
be kept earthen as

02:21:14.879 --> 02:21:20.799
Haley mentioned the amount of lots that they will be

02:21:20.799 --> 02:21:23.559
building is considerably

02:21:23.559 --> 02:21:26.739
less than what the maximum zoning allows them to do

02:21:26.739 --> 02:21:28.520
therefore reducing the amount

02:21:28.520 --> 02:21:35.010
of potential runoff coming through those a lot and at this

02:21:35.010 --> 02:21:37.000
point if you don't

02:21:37.000 --> 02:21:40.239
have any questions for me on the ESA matter I will

02:21:40.239 --> 02:21:41.639
transition back to Haley

02:21:41.639 --> 02:21:44.940
about the notification process and the percentage of

02:21:44.940 --> 02:21:46.840
opposition I think we're

02:21:46.840 --> 02:21:49.399
good things ever

02:21:54.559 --> 02:21:57.030
all right so to kind of wrap up here I wanted to review

02:21:57.030 --> 02:22:00.520
notifications for this

02:22:00.520 --> 02:22:02.600
did follow our zoning procedure so we did all the same

02:22:02.600 --> 02:22:03.520
notices that we would

02:22:03.520 --> 02:22:07.450
for a rezoning case which included the ad in the newspaper

02:22:07.450 --> 02:22:08.799
sign posting on the

02:22:08.799 --> 02:22:12.260
property as well as mailed notices with the 200 and 500

02:22:12.260 --> 02:22:13.280
foot buffer we did

02:22:13.280 --> 02:22:15.739
receive a few responses in writing to that you received

02:22:15.739 --> 02:22:16.559
some of those right

02:22:16.559 --> 02:22:16.559
before the work session this evening so there has been some

02:22:16.559 --> 02:22:20.799
opposition to the

02:22:20.799 --> 02:22:23.620
case primarily the concerns I've heard expressed related to

02:22:23.620 --> 02:22:24.600
the preservation of

02:22:24.600 --> 02:22:27.360
trees and concerns about drainage and some concerns that

02:22:27.360 --> 02:22:28.299
drainage could be

02:22:28.299 --> 02:22:31.479
backed up into the Regency Court area the applicant did

02:22:31.479 --> 02:22:32.520
hold a neighborhood

02:22:32.520 --> 02:22:36.020
meeting however and discussed a lot of this extensively and

02:22:36.020 --> 02:22:37.000
so they could speak

02:22:37.000 --> 02:22:39.180
a little bit more to how that meeting went but those were

02:22:39.180 --> 02:22:40.040
some of the primary

02:22:40.040 --> 02:22:43.309
concerns that I heard at that meeting so staff is

02:22:43.309 --> 02:22:45.280
recommending approval of the

02:22:45.280 --> 02:22:48.469
request with a few conditions the first condition being

02:22:48.469 --> 02:22:49.520
that disturbance of the

02:22:49.520 --> 02:22:54.629
ESA not exceed fill in excess of 190 thousand 450 square

02:22:54.629 --> 02:22:55.360
feet within the

02:22:55.360 --> 02:22:59.540
undeveloped floodplain second that invasive species within

02:22:59.540 --> 02:23:00.559
the ES areas be

02:23:00.559 --> 02:23:03.739
removed as the applicant is proposed third being that

02:23:03.739 --> 02:23:05.040
plants installed as part

02:23:05.040 --> 02:23:08.969
of the proposed native flora revegetation be installed and

02:23:08.969 --> 02:23:09.479
maintained by

02:23:09.479 --> 02:23:11.950
the current property owner and developer for a period of

02:23:11.950 --> 02:23:12.879
three years following

02:23:12.879 --> 02:23:16.159
their installation any time any plants that are removed

02:23:16.159 --> 02:23:17.200
destroyed or die within

02:23:17.200 --> 02:23:19.639
that three-year period should be required to be replaced by

02:23:19.639 --> 02:23:20.120
that current

02:23:20.120 --> 02:23:22.850
property owner and developer and then finally that

02:23:22.850 --> 02:23:24.319
following what the applicant

02:23:24.319 --> 02:23:26.790
has proposed no encroachment shall occur in the areas

02:23:26.790 --> 02:23:27.879
designated as riparian

02:23:27.879 --> 02:23:31.149
buffer ESA and with that I'd be happy to address any other

02:23:31.149 --> 02:23:31.760
questions you might

02:23:31.760 --> 02:23:33.959
have

02:23:34.520 --> 02:23:39.120
Christopher thank you chair Haley earlier I asked you if

02:23:39.120 --> 02:23:40.399
you would there was a 48

02:23:40.399 --> 02:23:44.739
inch storm drain would you show where that is it's gonna

02:23:44.739 --> 02:23:46.360
come out certainly so

02:23:46.360 --> 02:23:48.989
as part of this development to the east there was a storm

02:23:48.989 --> 02:23:49.920
drain stub to this

02:23:49.920 --> 02:23:54.079
point so that 48 inch pipe would be extended across the

02:23:54.079 --> 02:23:55.200
property under Meadow

02:23:55.200 --> 02:23:57.979
lands drive out falling here you can see there is a eas

02:23:57.979 --> 02:23:59.680
ement here for that to

02:23:59.680 --> 02:24:02.280
outfall into the floodplain and into the creek where it is

02:24:02.280 --> 02:24:03.239
intended and required

02:24:03.239 --> 02:24:07.200
by code to outfall okay so it'll remain a 48 inch concrete

02:24:07.200 --> 02:24:08.200
correct they'll be

02:24:08.200 --> 02:24:12.030
extending that existing 48 inch line okay I have a question

02:24:12.030 --> 02:24:12.799
for the app you

02:24:12.799 --> 02:24:15.270
know when comes out about the outlet I won't ask you about

02:24:15.270 --> 02:24:16.600
that though so thank you yes

02:24:16.600 --> 02:24:19.069
yes and the applicant is here and able to address any other

02:24:19.069 --> 02:24:19.799
concerns you may

02:24:19.799 --> 02:24:24.760
have I think that's it speaking of the applicant we do have

02:24:24.760 --> 02:24:25.520
a card for the

02:24:25.520 --> 02:24:31.200
applicant Lee Allison mr. Austin you have ten minutes or if

02:24:31.200 --> 02:24:32.799
you in Lance wanted

02:24:32.799 --> 02:24:35.579
to speak you would have a combined 20 minutes one

02:24:35.579 --> 02:24:37.399
clarification is I

02:24:37.399 --> 02:24:40.020
understood it if we have two people to speak we have a full

02:24:40.020 --> 02:24:41.120
20 minutes and we

02:24:41.120 --> 02:24:44.299
can divide it between ourselves any way we like that's fine

02:24:44.299 --> 02:24:45.319
mistaken that is

02:24:45.319 --> 02:24:49.209
that that is correct Haley's got me up but I got to figure

02:24:49.209 --> 02:24:51.319
out how to maximize

02:24:51.319 --> 02:25:00.879
this group that wasn't it pardon just like this one that's

02:25:00.879 --> 02:25:01.639
a funny looking

02:25:01.639 --> 02:25:05.739
icon good evening my name is Lee Allison with Allison

02:25:05.739 --> 02:25:07.399
engineering group once me

02:25:07.399 --> 02:25:11.329
this evening is Lance Holdorf our project manager Kent Key

02:25:11.329 --> 02:25:12.280
is the primary

02:25:12.280 --> 02:25:15.500
representative he extends his apologies but he had another

02:25:15.500 --> 02:25:16.319
engagement and

02:25:16.319 --> 02:25:21.750
thought we could handle this this evening the site

02:25:21.750 --> 02:25:23.120
generally the staff

02:25:23.120 --> 02:25:27.559
gave a good site location map what I'd like to point out on

02:25:27.559 --> 02:25:29.000
this while I'm here

02:25:29.000 --> 02:25:33.010
is that we are trying to transition from a very nice

02:25:33.010 --> 02:25:35.079
development here of good

02:25:35.079 --> 02:25:39.600
size lots of a state type development here very large lots

02:25:39.600 --> 02:25:42.040
into an nr3 zoning

02:25:42.040 --> 02:25:44.799
over here which has your typical lots that you see in the

02:25:44.799 --> 02:25:45.760
city so part of our

02:25:45.760 --> 02:25:49.180
idea was to work with that that stream as you can see comes

02:25:49.180 --> 02:25:50.280
through here where

02:25:50.280 --> 02:25:53.860
this tree line is and the stream buffer is there's a gravel

02:25:53.860 --> 02:25:54.959
road that goes to

02:25:54.959 --> 02:25:57.559
the back now already crossing the stream with culverts and

02:25:57.559 --> 02:25:58.559
goes to an existing

02:25:58.559 --> 02:26:03.319
home as mentioned before we rezoned this a couple of years

02:26:03.319 --> 02:26:04.879
ago at that time we

02:26:04.879 --> 02:26:08.299
were looking at going to an alternative the essay this

02:26:08.299 --> 02:26:09.840
particular zoning is

02:26:09.840 --> 02:26:13.450
backwards because you've got the high density zoning close

02:26:13.450 --> 02:26:14.520
to the larger lots

02:26:14.520 --> 02:26:18.559
and the low density zoning against where the nr3 was so we

02:26:18.559 --> 02:26:19.600
wanted to you know

02:26:19.600 --> 02:26:22.940
make this more uniform and we did that with the rezoning

02:26:22.940 --> 02:26:24.120
process trying to

02:26:24.120 --> 02:26:27.909
work the essay we had the essay going at the same time but

02:26:27.909 --> 02:26:29.319
we got caught into the

02:26:29.319 --> 02:26:34.200
chicken or egg to have an ESA you also have to have a plat

02:26:34.200 --> 02:26:35.799
already approved but

02:26:35.799 --> 02:26:37.530
how do you know how you're going to plant a property if you

02:26:37.530 --> 02:26:38.040
don't know if

02:26:38.040 --> 02:26:40.360
you're going to get the ESA or not and then to get the plat

02:26:40.360 --> 02:26:41.020
we had to have a

02:26:41.020 --> 02:26:45.090
clomer so we've spent a lot longer on this than we should

02:26:45.090 --> 02:26:46.680
have to help

02:26:46.680 --> 02:26:50.510
identify the ESA's we've prepared this exhibit the dark

02:26:50.510 --> 02:26:51.719
green lines on the

02:26:51.719 --> 02:26:55.670
outer side that's where the mapped floodplain is today this

02:26:55.670 --> 02:26:56.479
is a zone a

02:26:56.479 --> 02:27:01.129
floodplain it has not been studied therefore those are a

02:27:01.129 --> 02:27:02.680
bit subjective as

02:27:02.680 --> 02:27:05.860
to where those lines really are the blue air lines are

02:27:05.860 --> 02:27:07.239
where we're shrinking it

02:27:07.239 --> 02:27:11.200
to through the studies and the activities and the pink is

02:27:11.200 --> 02:27:12.159
showing where

02:27:12.159 --> 02:27:16.090
the stream buffer ESA is this is one ESA we have promised

02:27:16.090 --> 02:27:17.319
and all of our plans

02:27:17.319 --> 02:27:21.329
show we are absolutely not getting into except for this one

02:27:21.329 --> 02:27:22.639
little area right

02:27:22.639 --> 02:27:26.920
here this line on here is from the preliminary plat it's

02:27:26.920 --> 02:27:28.159
not a line we put

02:27:28.159 --> 02:27:32.280
on there this was established when this drainage was

02:27:32.280 --> 02:27:34.239
created in this storm sewer

02:27:34.239 --> 02:27:37.739
was established to bring this drainage all the way to the

02:27:37.739 --> 02:27:39.079
center of the stream

02:27:39.079 --> 02:27:41.879
and beyond so there's already an easement for that purpose

02:27:41.879 --> 02:27:42.920
there we are

02:27:42.920 --> 02:27:46.350
stopping our physical pipe here and transitioning from here

02:27:46.350 --> 02:27:47.840
into the channel

02:27:47.840 --> 02:27:51.979
so that when this does hit full force we're able to avoid

02:27:51.979 --> 02:27:53.479
the erosion issues

02:27:53.479 --> 02:27:56.659
with tearing that channel out but this shows the 50 foot

02:27:56.659 --> 02:27:58.520
stream buffer it takes

02:27:58.520 --> 02:28:02.920
up 52,000 square feet then we have the undeveloped flood

02:28:02.920 --> 02:28:04.280
plain which is all the

02:28:04.280 --> 02:28:10.090
green area 298,800 but that's inclusive of the stream

02:28:10.090 --> 02:28:11.440
buffer and yes we are

02:28:11.440 --> 02:28:15.959
encroaching upon this then we have the developed floodplain

02:28:15.959 --> 02:28:17.399
which is the blue

02:28:17.399 --> 02:28:21.000
area another 85,000 square feet and to answer one of your

02:28:21.000 --> 02:28:22.440
questions previously

02:28:22.440 --> 02:28:27.129
mr. Beck we're allowed to cross streams with roads and

02:28:27.129 --> 02:28:28.799
utilities at a reasonable

02:28:28.799 --> 02:28:32.280
number of locations doesn't matter if it's developed or

02:28:32.280 --> 02:28:32.840
undeveloped course

02:28:32.840 --> 02:28:35.770
FEMA doesn't recognize develop or undeveloped floodplain it

02:28:35.770 --> 02:28:36.319
's just flood

02:28:36.319 --> 02:28:39.500
plain and that's just part of the development development

02:28:39.500 --> 02:28:40.319
allowances that

02:28:40.319 --> 02:28:43.620
that we're capable of doing there was already a crossing

02:28:43.620 --> 02:28:44.319
here and we

02:28:44.319 --> 02:28:46.799
purposely brought the route up here to be within the

02:28:46.799 --> 02:28:48.200
developed floodplain for

02:28:48.200 --> 02:28:51.379
our crossing that was one of our considerations plus there

02:28:51.379 --> 02:28:52.040
's already a

02:28:52.040 --> 02:28:57.469
gravel road there this is all the combined existing ESA's

02:28:57.469 --> 02:28:58.559
on top of the

02:28:58.559 --> 02:29:05.510
map then we have the proposed ESA's with these gray areas

02:29:05.510 --> 02:29:06.600
the dark gray the

02:29:06.600 --> 02:29:09.920
floodplain develop undeveloped floodplain area we're

02:29:09.920 --> 02:29:11.799
recovering and the lighter

02:29:11.799 --> 02:29:16.329
gray above it the developed floodplain interestingly enough

02:29:16.329 --> 02:29:17.639
and again mr. Beck

02:29:17.639 --> 02:29:23.229
a discussion we've had in the past per the city code and

02:29:23.229 --> 02:29:24.840
not FEMA but per the

02:29:24.840 --> 02:29:28.770
Denton Development Code if you were to imagine this whole

02:29:28.770 --> 02:29:31.079
floodplain was a lake

02:29:31.079 --> 02:29:35.600
only 15% of the storage of that lake is in the area we're

02:29:35.600 --> 02:29:37.799
recovering 85% of the

02:29:37.799 --> 02:29:40.750
storage is in the area that's there in the blue and the

02:29:40.750 --> 02:29:42.079
green and the pink and

02:29:42.079 --> 02:29:46.799
really that's only used up during the hundred-year storm

02:29:46.799 --> 02:29:48.280
our water quality

02:29:48.280 --> 02:29:51.649
storms are not much wider than the red line that goes down

02:29:51.649 --> 02:29:52.799
the middle of this

02:29:52.799 --> 02:29:55.979
area so for water quality purposes we're not having an

02:29:55.979 --> 02:29:58.159
impact for flood control

02:29:58.159 --> 02:30:01.840
purposes we're really not having an impact because by recon

02:30:01.840 --> 02:30:03.180
figuring the

02:30:03.180 --> 02:30:07.120
stream we're able to make it more efficient more effective

02:30:07.120 --> 02:30:08.000
and put that

02:30:08.000 --> 02:30:12.280
land into productive use linger on this for just a second

02:30:12.280 --> 02:30:13.559
we've tried to provide

02:30:13.559 --> 02:30:17.110
some dimensions just to give perspective for example this

02:30:17.110 --> 02:30:18.239
portion of the stream

02:30:18.239 --> 02:30:26.239
existing map is 474 feet wide at this location it's 411 and

02:30:26.239 --> 02:30:29.879
260 it varies we

02:30:29.879 --> 02:30:37.389
are coming down to 183 here 176 at this location and looks

02:30:37.389 --> 02:30:39.899
like I can't read

02:30:39.899 --> 02:30:44.520
117 at that location another thing well I'll go on to these

02:30:44.520 --> 02:30:45.760
other signs we did

02:30:45.760 --> 02:30:48.940
have a neighborhood meeting we use the same notification

02:30:48.940 --> 02:30:49.959
limits that the city

02:30:49.959 --> 02:30:53.489
does the 500 foot distance the first thing we're asked is

02:30:53.489 --> 02:30:54.040
you put in

02:30:54.040 --> 02:30:58.399
apartments or condominiums no it's single-family only I see

02:30:58.399 --> 02:30:58.600
there's

02:30:58.600 --> 02:31:01.780
probably another number of neighbors out here this evening

02:31:01.780 --> 02:31:02.360
they may have some

02:31:02.360 --> 02:31:04.969
concerns that were not mentioned at the meeting one

02:31:04.969 --> 02:31:07.360
discussion was traffic this

02:31:07.360 --> 02:31:11.110
was at the corner lot of metal lines in Belmont let me go

02:31:11.110 --> 02:31:11.879
back to this

02:31:11.879 --> 02:31:19.000
slide this lot in particular where am I this lot in

02:31:19.000 --> 02:31:21.159
particular because metals

02:31:21.159 --> 02:31:25.090
comes through in dead ends understand they didn't want more

02:31:25.090 --> 02:31:25.799
traffic coming

02:31:25.799 --> 02:31:28.979
through there but at the same time we are going with a much

02:31:28.979 --> 02:31:29.959
lower density so

02:31:29.959 --> 02:31:33.600
the traffic through here going from this direction out

02:31:33.600 --> 02:31:35.159
would be less yes there's

02:31:35.159 --> 02:31:37.840
people in this neighborhood that would come through but in

02:31:37.840 --> 02:31:38.840
accordance with the

02:31:38.840 --> 02:31:41.399
mobility plan and the fact this road is stubbed out in the

02:31:41.399 --> 02:31:42.200
drainage it was

02:31:42.200 --> 02:31:45.399
stubbed out to provide that connectivity so while I

02:31:45.399 --> 02:31:47.040
appreciate their dilemma

02:31:47.040 --> 02:31:52.469
that's just unfortunate misunderstood part of the

02:31:52.469 --> 02:31:54.120
development of the city but

02:31:54.120 --> 02:31:56.870
it's lower density and planned Street extension concerns

02:31:56.870 --> 02:31:58.760
about drainage the

02:31:58.760 --> 02:32:01.940
primary concern was are we backing water up into the Royal

02:32:01.940 --> 02:32:03.799
Oaks addition and the

02:32:03.799 --> 02:32:06.979
answer is both the Denton Development Code and FEMA

02:32:06.979 --> 02:32:08.239
guidelines do not allow us

02:32:08.239 --> 02:32:11.420
to do that we've done extensive studies and modeling to

02:32:11.420 --> 02:32:12.319
show we're not doing

02:32:12.319 --> 02:32:15.139
that and not only that we're actually opening up the area

02:32:15.139 --> 02:32:15.840
immediately

02:32:15.840 --> 02:32:19.100
downstream and removing some of the inundations in the

02:32:19.100 --> 02:32:20.239
stream that would

02:32:20.239 --> 02:32:24.170
cause it to back up so we're avoiding that we're opening it

02:32:24.170 --> 02:32:24.879
up tree

02:32:24.879 --> 02:32:27.450
preservation particularly along the north and east

02:32:27.450 --> 02:32:29.440
perimeter we're exceeding

02:32:29.440 --> 02:32:33.680
the city requirements for tree preservation I'll show you

02:32:33.680 --> 02:32:34.280
our tree

02:32:34.280 --> 02:32:37.799
mitigation plan later there's very few trees identified

02:32:37.799 --> 02:32:39.120
against there we think

02:32:39.120 --> 02:32:41.319
they're really on if you look at a map an aerial you can

02:32:41.319 --> 02:32:42.200
see them but we think

02:32:42.200 --> 02:32:44.370
they're on the neighbors properties not ours the surveyor

02:32:44.370 --> 02:32:46.200
didn't pick them up and

02:32:46.200 --> 02:32:48.909
at the same time we're matching great at those locations so

02:32:48.909 --> 02:32:49.760
we don't have any

02:32:49.760 --> 02:32:52.940
reason to go in there and tear them out the developer is

02:32:52.940 --> 02:32:54.079
actually importing

02:32:54.079 --> 02:32:58.010
eighty thousand cubic yards of dirt in here to help

02:32:58.010 --> 02:32:59.799
minimize the impact on

02:32:59.799 --> 02:33:03.309
trees in fact I got embarrassed in front of my staff

02:33:03.309 --> 02:33:04.520
because they had a grading

02:33:04.520 --> 02:33:06.989
plan with all this grading in it I said there's no way he

02:33:06.989 --> 02:33:08.440
'll ever pay that they

02:33:08.440 --> 02:33:11.370
show it to Kent and he says no I got 80,000 yards coming in

02:33:11.370 --> 02:33:11.959
let's see what we

02:33:11.959 --> 02:33:15.440
can do to save those trees so he's not going to go in there

02:33:15.440 --> 02:33:16.760
and arbitrarily

02:33:16.760 --> 02:33:19.219
take trees out after he's spending this kind of money to do

02:33:19.219 --> 02:33:20.000
what he can to help

02:33:20.000 --> 02:33:24.989
save trees generally a lower lot density the original

02:33:24.989 --> 02:33:25.879
zoning we could have a

02:33:25.879 --> 02:33:30.159
hundred and eleven lots the zoning that we got in place

02:33:30.159 --> 02:33:31.000
allows a hundred and

02:33:31.000 --> 02:33:34.639
twenty four lots but because we were looking at this ESA

02:33:34.639 --> 02:33:35.239
from the very

02:33:35.239 --> 02:33:40.680
beginning we suggested with P&Z and council a maximum of 78

02:33:40.680 --> 02:33:41.680
I don't know if

02:33:41.680 --> 02:33:44.569
staff has record of it but that was what was agreed to and

02:33:44.569 --> 02:33:45.760
we understand as part

02:33:45.760 --> 02:33:50.120
of the ordinance we're coming in at 73 if I were to convert

02:33:50.120 --> 02:33:51.159
that to a zoning

02:33:51.159 --> 02:33:56.139
category to be something like an NR 2.1 we could take two

02:33:56.139 --> 02:33:57.479
lots off and develop

02:33:57.479 --> 02:34:01.649
this under an NR 2 zoning and be fine we're larger lots

02:34:01.649 --> 02:34:03.159
ranging in size from

02:34:03.159 --> 02:34:08.590
10,000 to 24,000 an average of about 15,000 square feet

02:34:08.590 --> 02:34:09.920
continuation of the

02:34:09.920 --> 02:34:12.389
surrounding neighborhoods to the north and east

02:34:12.389 --> 02:34:13.840
transitioning to the west as

02:34:13.840 --> 02:34:17.770
I mentioned earlier we're removing invasive species and

02:34:17.770 --> 02:34:18.520
honestly that was

02:34:18.520 --> 02:34:21.799
not our idea Deborah brought that to our attention and said

02:34:21.799 --> 02:34:22.520
can you get in there

02:34:22.520 --> 02:34:25.489
and pull them out and we say whatever you say so we're

02:34:25.489 --> 02:34:26.280
getting in there to

02:34:26.280 --> 02:34:31.040
accomplish that we're going to revegetate with native flora

02:34:31.040 --> 02:34:32.680
and that's

02:34:32.680 --> 02:34:36.879
in the undeveloped flood plain we're doing an earth and

02:34:36.879 --> 02:34:37.959
channel in the

02:34:37.959 --> 02:34:40.569
under in the developed flood plain which the drainage

02:34:40.569 --> 02:34:41.920
department would rather we

02:34:41.920 --> 02:34:45.200
do concrete because it's easier for them to maintain so but

02:34:45.200 --> 02:34:46.799
we have chosen to do

02:34:46.799 --> 02:34:49.680
the earth and channel for those reasons and in there we're

02:34:49.680 --> 02:34:50.680
gonna go back with a

02:34:50.680 --> 02:34:53.969
native floor instead of Bermuda grass or something of that

02:34:53.969 --> 02:34:55.760
nature the proposed

02:34:55.760 --> 02:34:58.840
development be high quality development

02:34:58.840 --> 02:35:01.500
it wasn't 20 minutes you can continue I'm gonna make it

02:35:01.500 --> 02:35:03.239
quick I can improve the

02:35:03.239 --> 02:35:06.959
drainage area no adverse in strength impacts upstream or

02:35:06.959 --> 02:35:07.760
downstream not

02:35:07.760 --> 02:35:11.190
allowed by code or modeling this shows our two phases and

02:35:11.190 --> 02:35:12.360
how the roads will

02:35:12.360 --> 02:35:16.290
come together that help shows how the first phase is going

02:35:16.290 --> 02:35:17.399
to be done we will

02:35:17.399 --> 02:35:20.579
have a sewer line in this easement which we hope lines up

02:35:20.579 --> 02:35:21.520
with what we're gonna

02:35:21.520 --> 02:35:24.840
do in the future when we call this a temporary road it's

02:35:24.840 --> 02:35:25.639
gonna be an asphalt

02:35:25.639 --> 02:35:28.920
road we're gonna need to be able to get emergency vehicles

02:35:28.920 --> 02:35:30.280
construction vehicles

02:35:30.280 --> 02:35:32.930
for the subdivision and construction vehicles for the home

02:35:32.930 --> 02:35:33.719
this way instead

02:35:33.719 --> 02:35:36.559
of going all through this neighborhood all the time so we

02:35:36.559 --> 02:35:37.280
are doing that in

02:35:37.280 --> 02:35:41.600
fact we've got plans for a text on permit back to this one

02:35:41.600 --> 02:35:42.440
this line right

02:35:42.440 --> 02:35:47.549
here that is where we anticipate the text on is gonna ask

02:35:47.549 --> 02:35:48.799
for right away in

02:35:48.799 --> 02:35:52.379
that case we're gonna lose six lots through here and shift

02:35:52.379 --> 02:35:53.440
all this over that

02:35:53.440 --> 02:35:56.620
direction that's why we're waiting on this area for phase

02:35:56.620 --> 02:35:57.319
two to get all that

02:35:57.319 --> 02:36:02.260
worked out with the text on there's the tree mitigation

02:36:02.260 --> 02:36:03.719
plan the ones in green

02:36:03.719 --> 02:36:07.909
we're keeping the ones in red will go again I think there's

02:36:07.909 --> 02:36:09.120
trees up here that

02:36:09.120 --> 02:36:11.950
have been questioned about because there may be under six

02:36:11.950 --> 02:36:12.799
inches they weren't

02:36:12.799 --> 02:36:15.979
picked up on our survey or on the neighbors property line

02:36:15.979 --> 02:36:16.920
but again with

02:36:16.920 --> 02:36:22.180
us matching grade along here and here whoops here and here

02:36:22.180 --> 02:36:22.920
there's no real

02:36:22.920 --> 02:36:26.850
reason to expect that we would take any trees out and I

02:36:26.850 --> 02:36:28.120
hope you can see what

02:36:28.120 --> 02:36:30.680
the developers intentions he's not gonna go in there and

02:36:30.680 --> 02:36:31.959
arbitrarily take a tree

02:36:31.959 --> 02:36:38.219
out I cannot say answer your questions mr. Beck that were

02:36:38.219 --> 02:36:39.639
brought up during

02:36:39.639 --> 02:36:47.760
workshop I don't do invasive species removal on a daily

02:36:47.760 --> 02:36:49.760
basis but we have we

02:36:49.760 --> 02:36:53.049
are working with tree shepherds of Denton we want an expert

02:36:53.049 --> 02:36:53.840
in there and

02:36:53.840 --> 02:36:57.770
somebody who's local and local accountable accountability

02:36:57.770 --> 02:36:58.399
to help us

02:36:58.399 --> 02:37:01.579
find the right methods we're gonna have to balance the

02:37:01.579 --> 02:37:06.920
concerns between whatever

02:37:06.920 --> 02:37:10.100
materials are used to remove the privet with leaving the

02:37:10.100 --> 02:37:11.399
privet itself there I

02:37:11.399 --> 02:37:14.579
mean the city wants the privet out because it's its own

02:37:14.579 --> 02:37:16.520
issue privets do

02:37:16.520 --> 02:37:20.100
affect the flood carrying capability you block the channel

02:37:20.100 --> 02:37:21.360
with them so we think

02:37:21.360 --> 02:37:24.540
removing the privets will be a great thing to do but at the

02:37:24.540 --> 02:37:25.399
same time there

02:37:25.399 --> 02:37:29.329
are considerations we need to work on as we move forward as

02:37:29.329 --> 02:37:32.120
far as the endangered

02:37:32.120 --> 02:37:36.340
species we checked the report actually there was four not

02:37:36.340 --> 02:37:37.959
three might have been

02:37:37.959 --> 02:37:41.139
a number transfer because the study was done on four three

02:37:41.139 --> 02:37:42.120
two thousand and

02:37:42.120 --> 02:37:47.549
seventeen the four species are the least turn which is a

02:37:47.549 --> 02:37:50.040
bird not real common in

02:37:50.040 --> 02:37:52.739
this area but still it's been seen here occasionally and

02:37:52.739 --> 02:37:53.799
needed to be checked

02:37:53.799 --> 02:37:57.790
out the piping plover which is primarily a coastal or a

02:37:57.790 --> 02:37:59.479
beach bird when seen in

02:37:59.479 --> 02:38:02.420
these areas it's usually among lakes but because it's here

02:38:02.420 --> 02:38:03.360
they specifically

02:38:03.360 --> 02:38:06.680
looked at it the red knot which is another bird medium-

02:38:06.680 --> 02:38:07.639
sized another shore

02:38:07.639 --> 02:38:10.819
bird but again it's been here occasionally I mean we've

02:38:10.819 --> 02:38:11.200
seen bald

02:38:11.200 --> 02:38:14.059
Eagles up at Lake Ray Roberts so you got to watch for what

02:38:14.059 --> 02:38:15.000
's out here in the

02:38:15.000 --> 02:38:18.799
whooping crane the study looked at each one of those

02:38:18.799 --> 02:38:21.520
specifically to look for

02:38:21.520 --> 02:38:25.450
evidence of their being there they found none and those

02:38:25.450 --> 02:38:26.920
reports were signed off

02:38:26.920 --> 02:38:31.149
on by the appropriate authorities at the federal level so

02:38:31.149 --> 02:38:32.719
hard to take so long I

02:38:32.719 --> 02:38:35.520
realize this is a public hearing somebody now may not be

02:38:35.520 --> 02:38:36.200
the time for

02:38:36.200 --> 02:38:38.819
questions but I'll take them now or later it's your

02:38:38.819 --> 02:38:40.159
pleasure we got at least

02:38:40.159 --> 02:38:43.520
one commissioner back thank you chair thank you Lee I do

02:38:43.520 --> 02:38:44.239
appreciate your

02:38:44.239 --> 02:38:47.889
presentation and I respect the fact that that this has been

02:38:47.889 --> 02:38:49.600
a hassle for you yet

02:38:49.600 --> 02:38:52.780
nonetheless I think we're coming up with a product that you

02:38:52.780 --> 02:38:53.280
know please

02:38:53.280 --> 02:38:55.840
everybody I think you and I you know we tend to be on

02:38:55.840 --> 02:38:57.319
opposite sides but for the

02:38:57.319 --> 02:39:00.639
most part we both have the general public's concern in mind

02:39:00.639 --> 02:39:01.159
and I

02:39:01.159 --> 02:39:03.909
appreciate what you're doing here thank you for let me know

02:39:03.909 --> 02:39:04.959
what the species are

02:39:04.959 --> 02:39:08.239
they're all birds so they can easily elope to some other

02:39:08.239 --> 02:39:09.079
area where we're not

02:39:09.079 --> 02:39:11.559
dealing with ground creatures so I appreciate that I had a

02:39:11.559 --> 02:39:12.920
pretty good email

02:39:12.920 --> 02:39:17.680
conversation with your engineer you calling Lance okay

02:39:17.680 --> 02:39:18.760
Lawrence is okay

02:39:18.760 --> 02:39:24.399
so it's okay to call him Lance he indicated said one way we

02:39:24.399 --> 02:39:25.239
're trying to

02:39:25.239 --> 02:39:28.840
preserve the ecosystem is by relocating a part of the

02:39:28.840 --> 02:39:30.159
landscape to the yards now

02:39:30.159 --> 02:39:33.760
am I to take that that you're gonna take soil in the area

02:39:33.760 --> 02:39:35.520
and relocate it to for

02:39:35.520 --> 02:39:39.680
that filler you need up against the you mentioned 80,000

02:39:39.680 --> 02:39:41.520
square feet of importing

02:39:41.520 --> 02:39:44.879
80,000 square feet of film I thought no I can elaborate

02:39:44.879 --> 02:39:47.079
though okay is because

02:39:47.079 --> 02:39:50.670
we're going to larger lots we're not going to have near as

02:39:50.670 --> 02:39:51.840
much coverage on

02:39:51.840 --> 02:39:54.569
those lots as you would if we had the real small ones and

02:39:54.569 --> 02:39:55.639
packed everything

02:39:55.639 --> 02:40:02.129
in as a result the grass area that's on the edges of the

02:40:02.129 --> 02:40:03.879
floodplain that collects

02:40:03.879 --> 02:40:09.469
water coming from the sides does give it some amount of

02:40:09.469 --> 02:40:11.600
water quality treatment

02:40:11.600 --> 02:40:15.850
at the same time when we've got larger lots now that the

02:40:15.850 --> 02:40:17.360
rain falls off the

02:40:17.360 --> 02:40:20.000
roofs and goes into the yards etc it's gonna have more

02:40:20.000 --> 02:40:21.479
grass area there to

02:40:21.479 --> 02:40:24.350
accommodate the water quality so we'll be getting some

02:40:24.350 --> 02:40:25.479
water quality in the

02:40:25.479 --> 02:40:29.270
yards of these much larger lots that we would not happen if

02:40:29.270 --> 02:40:30.079
we went to your

02:40:30.079 --> 02:40:35.219
typical pack density subdivision okay okay you've got that

02:40:35.219 --> 02:40:36.040
big old pile of

02:40:36.040 --> 02:40:40.360
dirt over there that's probably about 20 feet wide about 12

02:40:40.360 --> 02:40:41.760
15 feet high and

02:40:41.760 --> 02:40:45.520
about 30 yes sir so is that gonna be part of is that gonna

02:40:45.520 --> 02:40:46.319
be spread out over

02:40:46.319 --> 02:40:50.250
the development that is 20,000 yards of the 80,000 we need

02:40:50.250 --> 02:40:50.959
to bring in okay

02:40:50.959 --> 02:40:56.389
there's more to come okay can you put your tree mitigation

02:40:56.389 --> 02:40:58.639
okay now I don't

02:40:58.639 --> 02:41:01.459
see and I know a lot of those trees for the invasive trees

02:41:01.459 --> 02:41:02.559
we're gonna get rid

02:41:02.559 --> 02:41:06.200
of but the road that's coming in metal lands that right now

02:41:06.200 --> 02:41:07.360
is that stream we

02:41:07.360 --> 02:41:10.940
were talking about that's gonna feed into Hickory Creek

02:41:10.940 --> 02:41:12.639
that's bordered with

02:41:12.639 --> 02:41:15.340
you know some pretty healthy trees so you didn't count

02:41:15.340 --> 02:41:16.479
those trees as part of

02:41:16.479 --> 02:41:20.270
the tree mitigation plan our surveyor went out and we've

02:41:20.270 --> 02:41:21.520
only shown trees that

02:41:21.520 --> 02:41:24.280
are six inches in diameter and larger so a lot of times

02:41:24.280 --> 02:41:25.479
when you see trees in a

02:41:25.479 --> 02:41:28.799
long row like that they'll be smaller trunk trees so they

02:41:28.799 --> 02:41:29.239
didn't necessarily

02:41:29.239 --> 02:41:35.979
qualify but again pardon me by doing this one doesn't show

02:41:35.979 --> 02:41:36.760
it as well but

02:41:36.760 --> 02:41:39.940
there's our ESA that we're totally staying out of so other

02:41:39.940 --> 02:41:40.680
trees in that

02:41:40.680 --> 02:41:43.969
area will be avoided and again we're doing minimal grading

02:41:43.969 --> 02:41:46.719
in this area so

02:41:46.719 --> 02:41:49.809
I was out looking and I don't disagree that probably most

02:41:49.809 --> 02:41:50.520
of those are six

02:41:50.520 --> 02:41:52.989
inches or less but there was there was a few that never

02:41:52.989 --> 02:41:55.049
greater than six inches so I was just curious about that

02:41:55.049 --> 02:41:55.200
and

02:41:55.200 --> 02:42:00.790
lastly the drainage that comes out there at metal lands how

02:42:00.790 --> 02:42:02.760
far set back from the

02:42:02.760 --> 02:42:07.629
riparian stream is that it's gonna is it set up to hit well

02:42:07.629 --> 02:42:09.079
we have put our

02:42:09.079 --> 02:42:13.129
easement right here so we're we're bringing that pipe out

02:42:13.129 --> 02:42:14.040
at the end and

02:42:14.040 --> 02:42:17.770
battling it so that we can put some riprap in here so we're

02:42:17.770 --> 02:42:18.639
I don't think

02:42:18.639 --> 02:42:21.110
we're I know we're not getting into the stream buffer

02:42:21.110 --> 02:42:23.000
itself okay we will get

02:42:23.000 --> 02:42:27.239
into that floodplain good good one concern I had and I was

02:42:27.239 --> 02:42:27.600
gonna mention

02:42:27.600 --> 02:42:31.729
in some respect or another is and I think what you're doing

02:42:31.729 --> 02:42:32.760
here is gonna

02:42:32.760 --> 02:42:36.260
preserve what we want to preserve you know it's

02:42:36.260 --> 02:42:38.440
disappointing to see that we

02:42:38.440 --> 02:42:41.620
lost that northern section of the floodplain and the rip

02:42:41.620 --> 02:42:42.559
arian buffer up

02:42:42.559 --> 02:42:46.840
there you know from work that was done previously you know

02:42:46.840 --> 02:42:47.760
shame on us back

02:42:47.760 --> 02:42:50.229
then whoever it was we're not paying a little bit more

02:42:50.229 --> 02:42:51.319
attention so every time

02:42:51.319 --> 02:42:55.770
we come in and alter an ESA like you're doing here but for

02:42:55.770 --> 02:42:56.959
the good you know I

02:42:56.959 --> 02:42:59.610
always worry about the risk it's gonna have later down the

02:42:59.610 --> 02:43:00.200
road will it

02:43:00.200 --> 02:43:03.020
diminish it that much more and from what I can tell what

02:43:03.020 --> 02:43:03.920
you're doing I think

02:43:03.920 --> 02:43:07.340
you're making every effort to make sure it doesn't but I

02:43:07.340 --> 02:43:09.040
just I say this openly

02:43:09.040 --> 02:43:12.010
because you are a developer and any developer that might be

02:43:12.010 --> 02:43:12.760
listening in

02:43:12.760 --> 02:43:16.700
that how their development can impact these these hoes down

02:43:16.700 --> 02:43:18.000
the road if we're

02:43:18.000 --> 02:43:20.969
paying attention to them we can we can develop in a way

02:43:20.969 --> 02:43:21.799
that it won't

02:43:21.799 --> 02:43:25.270
negatively impact them so thank you Lee relative to that we

02:43:25.270 --> 02:43:26.079
also took into

02:43:26.079 --> 02:43:30.440
consideration that probably a hundred feet or more off of

02:43:30.440 --> 02:43:32.360
here I remember the

02:43:32.360 --> 02:43:34.520
name of the road earlier but there's an arterial road that

02:43:34.520 --> 02:43:35.239
will be extended

02:43:35.239 --> 02:43:37.870
through here it's on the city master thoroughfare plan also

02:43:37.870 --> 02:43:38.520
there's a gas

02:43:38.520 --> 02:43:42.309
well down here you saw the few lights lots that are within

02:43:42.309 --> 02:43:43.799
that distance so I

02:43:43.799 --> 02:43:48.040
don't know that much can no no that you know but I think

02:43:48.040 --> 02:43:49.879
north of Ryan there's a

02:43:49.879 --> 02:43:55.309
street called Sanders or something like that it's well

02:43:55.309 --> 02:43:57.040
south of your development

02:43:57.040 --> 02:43:59.040
there

02:44:01.000 --> 02:44:04.180
my map isn't big enough yeah it's Sanders it's it's it's

02:44:04.180 --> 02:44:05.239
south of there

02:44:05.239 --> 02:44:08.600
right and that doesn't go all the way through into Forest

02:44:08.600 --> 02:44:10.159
Ridge like Ryan does

02:44:10.159 --> 02:44:15.200
but is is that an area well this it's El Paso I remember

02:44:15.200 --> 02:44:17.000
down this street is our

02:44:17.000 --> 02:44:20.180
collector Street identified on the master thoroughfare

02:44:20.180 --> 02:44:20.680
played to come

02:44:20.680 --> 02:44:25.790
through so a lot of the traffic that may be winding through

02:44:25.790 --> 02:44:27.280
here initially in the

02:44:27.280 --> 02:44:31.520
future will come down that's El Paso yes that's El Paso

02:44:31.520 --> 02:44:32.280
okay of course that's

02:44:32.280 --> 02:44:36.799
going to impact this floodplain and stream as well is that

02:44:36.799 --> 02:44:37.399
on our is that on

02:44:37.399 --> 02:44:40.920
our mobility plan yes it is okay thank you I usually keep

02:44:40.920 --> 02:44:42.120
ahead of that didn't

02:44:42.120 --> 02:44:46.639
catch it okay great thanks Lee thank you I don't see any

02:44:46.639 --> 02:44:47.399
other questions mr.

02:44:47.399 --> 02:44:51.329
Allison thank you I do have one card to speak but it is a

02:44:51.329 --> 02:44:51.979
public hearing so

02:44:51.979 --> 02:44:57.399
others more welcome to the card I have is for Jim speck

02:44:57.399 --> 02:44:58.700
feed to state your name

02:44:58.700 --> 02:45:02.799
and address for the record

02:45:03.120 --> 02:45:08.719
hi I'm Jim speck 400 Regency Court I represent the Regency

02:45:08.719 --> 02:45:09.760
Corps Regency Oaks

02:45:09.760 --> 02:45:12.940
homeowners Association we're the homeowners Association

02:45:12.940 --> 02:45:13.879
that's just north

02:45:13.879 --> 02:45:17.549
of the proposed development as a whole well first I'd like

02:45:17.549 --> 02:45:18.540
to speak to the

02:45:18.540 --> 02:45:21.760
notices that was sent out only the homes that were along

02:45:21.760 --> 02:45:23.520
the south side of our

02:45:23.520 --> 02:45:26.700
community got any kind of notification nobody else within

02:45:26.700 --> 02:45:28.159
the 500 got any kind

02:45:28.159 --> 02:45:30.750
of communication so our reason why I even found out about

02:45:30.750 --> 02:45:31.360
it is because of

02:45:31.360 --> 02:45:34.540
one of the other neighbors spoke as a whole we're not

02:45:34.540 --> 02:45:35.239
opposed to the

02:45:35.239 --> 02:45:39.500
development what we are opposed to is the small opening

02:45:39.500 --> 02:45:41.159
that they have for the

02:45:41.159 --> 02:45:44.790
drainage we just don't feel that that's going to be enough

02:45:44.790 --> 02:45:45.639
it really needs to be

02:45:45.639 --> 02:45:49.430
at least half the size of the floodplain the one that is on

02:45:49.430 --> 02:45:50.799
our side is that way

02:45:50.799 --> 02:46:00.209
I have some pictures of it so ours is more open than what

02:46:00.209 --> 02:46:02.399
they have proposed

02:46:02.399 --> 02:46:04.920
and we're afraid it's gonna be a bottleneck if you look

02:46:04.920 --> 02:46:05.680
back on theirs

02:46:05.680 --> 02:46:10.899
you're gonna see that it's gonna basically right there we

02:46:10.899 --> 02:46:11.479
're just gonna

02:46:11.479 --> 02:46:16.260
bottleneck that it's gonna back up everything upstream I

02:46:16.260 --> 02:46:17.200
understand what

02:46:17.200 --> 02:46:19.930
mr. Lee was saying about you know the studies they've done

02:46:19.930 --> 02:46:20.639
or whatever but I

02:46:20.639 --> 02:46:24.430
live next door to it so I see it it's not a fair stream

02:46:24.430 --> 02:46:26.159
when it rains all that

02:46:26.159 --> 02:46:29.340
torrential rain that we get that that stream will rise

02:46:29.340 --> 02:46:30.600
almost up to the top of

02:46:30.600 --> 02:46:33.950
the picture that I just showed you guys so it's almost like

02:46:33.950 --> 02:46:34.879
the around it in

02:46:34.879 --> 02:46:37.350
high school and everything you guys have seen those cement

02:46:37.350 --> 02:46:38.360
things fill up that's

02:46:38.360 --> 02:46:41.940
the way it is if they put that small opening in there it's

02:46:41.940 --> 02:46:43.280
just gonna back up

02:46:43.280 --> 02:46:46.129
into our neighborhood and you know back upstream and all

02:46:46.129 --> 02:46:47.159
the way up back up to

02:46:47.159 --> 02:46:49.780
Hobson so that's our biggest concern so I'll invite the

02:46:49.780 --> 02:46:51.040
applicant to speak but

02:46:51.040 --> 02:46:55.239
before that Mr. Beck do you have a question? I do. Mr. Beck

02:46:55.239 --> 02:46:56.159
can you as best

02:46:56.159 --> 02:46:58.829
you can kind of pinpoint where you're talking about where

02:46:58.829 --> 02:46:59.719
that culvert is on

02:46:59.719 --> 02:47:03.170
your side of this development? Basically where this and

02:47:03.170 --> 02:47:04.479
that's another reason

02:47:04.479 --> 02:47:07.909
where these two homes are right here the floodplain splits

02:47:07.909 --> 02:47:09.280
these two homes and our

02:47:09.280 --> 02:47:12.780
bridge is basically right up here and as mr. Lee showed you

02:47:12.780 --> 02:47:13.920
I don't have a thing

02:47:13.920 --> 02:47:17.520
but we have you know one acre two acre lots so it's a wide

02:47:17.520 --> 02:47:18.639
area on our side

02:47:18.639 --> 02:47:21.100
that all that water is going to come down and basically you

02:47:21.100 --> 02:47:21.680
look on theirs

02:47:21.680 --> 02:47:24.610
they're trying to shrink the floodplain a little bit which

02:47:24.610 --> 02:47:25.600
I don't have a problem

02:47:25.600 --> 02:47:28.459
with that as long as they make the water go but where that

02:47:28.459 --> 02:47:30.159
road is it's got to be

02:47:30.159 --> 02:47:33.340
a wide opening otherwise it's just gonna back up into us.

02:47:33.340 --> 02:47:35.280
Can we get Lee Allison

02:47:35.280 --> 02:47:45.030
to come back down and address that? Good evening we've

02:47:45.030 --> 02:47:48.159
actually got four or five

02:47:48.159 --> 02:47:52.090
foot by ten foot box culverts planned there. Scale of the

02:47:52.090 --> 02:47:53.040
drawing may look it's

02:47:53.040 --> 02:47:56.420
make it look smaller but we've actually got a larger cross-

02:47:56.420 --> 02:47:57.479
sectional opening in

02:47:57.479 --> 02:48:00.659
our culverts than is what is upstream. We have the designs

02:48:00.659 --> 02:48:01.760
and the model of those

02:48:01.760 --> 02:48:05.690
and we looked at them very closely and then of course did

02:48:05.690 --> 02:48:07.159
the analysis here to

02:48:07.159 --> 02:48:09.809
make sure that would not over top those. We've turned that

02:48:09.809 --> 02:48:10.799
into the city those

02:48:10.799 --> 02:48:14.020
models have been analyzed by the city they've also been

02:48:14.020 --> 02:48:15.440
analyzed by FEMA and

02:48:15.440 --> 02:48:18.959
they have asked us to turn in the sign seal drawings to

02:48:18.959 --> 02:48:20.479
FEMA. They've accepted

02:48:20.479 --> 02:48:26.670
that model as well so that culvert that gentleman's

02:48:26.670 --> 02:48:28.280
referring to is probably

02:48:28.280 --> 02:48:31.739
about 200 feet away because it's under the road up here at

02:48:31.739 --> 02:48:33.600
Regency Court and

02:48:33.600 --> 02:48:37.229
granted these are large homes and it's a pretty wide open

02:48:37.229 --> 02:48:40.120
channel and I'm very

02:48:40.120 --> 02:48:42.760
confident that we're... So you can leave Mr. Speck's

02:48:42.760 --> 02:48:45.479
concern about bottle making and

02:48:45.479 --> 02:48:52.049
also we sized our culverts per the city criteria to

02:48:52.049 --> 02:48:54.040
accommodate the 100 year

02:48:54.040 --> 02:48:58.260
storm when all of the drainage area upstream is fully

02:48:58.260 --> 02:48:59.840
developed per city

02:48:59.840 --> 02:49:03.479
zoning and requirements so we've got it much larger we

02:49:03.479 --> 02:49:05.559
believe than it needs to

02:49:05.559 --> 02:49:08.739
be there and our culvert types well they've got box cul

02:49:08.739 --> 02:49:10.559
verts as well.

02:49:10.559 --> 02:49:17.559
Also we put theirs in the model as long as ours. How wide?

02:49:17.559 --> 02:49:19.639
410 foot that's at least 40

02:49:19.639 --> 02:49:24.079
feet wide. It's just the scale of the drawings it's a

02:49:24.079 --> 02:49:25.479
understandable concern

02:49:25.479 --> 02:49:29.829
and without seeing our detailed drawings I could look at

02:49:29.829 --> 02:49:31.159
that and that probably

02:49:31.159 --> 02:49:36.120
come to the same conclusion. Thank you. Thank you both.

02:49:36.120 --> 02:49:37.639
This is a public

02:49:37.639 --> 02:49:41.709
hearing anyone wishing to speak on the item can certainly

02:49:41.709 --> 02:49:46.239
do so. Sir. If you just fill out a

02:49:46.239 --> 02:49:49.739
card after speaking and then state your name and address

02:49:49.739 --> 02:49:51.479
for the record. Rick

02:49:51.479 --> 02:49:56.909
Wisenhunt and my address is 3306 Belmont and I on the tree

02:49:56.909 --> 02:49:57.920
mitigation I just don't

02:49:57.920 --> 02:50:01.709
I don't understand I guess so I'm trying to figure out does

02:50:01.709 --> 02:50:02.479
that mean that the

02:50:02.479 --> 02:50:05.139
trees it looked like almost all the trees are coming out is

02:50:05.139 --> 02:50:05.760
that what's going

02:50:05.760 --> 02:50:09.579
on is that what we're talking about? Mr. Alston can you

02:50:09.579 --> 02:50:11.120
speak to the tree

02:50:11.120 --> 02:50:23.829
mitigation? Per the drawing and if I can get it back up the

02:50:23.829 --> 02:50:24.840
trees identified

02:50:24.840 --> 02:50:27.540
here both red and green are all the trees the survey are

02:50:27.540 --> 02:50:28.600
identified that are

02:50:28.600 --> 02:50:32.969
six inches in diameter and larger. The green trees will be

02:50:32.969 --> 02:50:35.000
preserved and the

02:50:35.000 --> 02:50:39.549
red trees are scheduled to come out. If for some reason

02:50:39.549 --> 02:50:41.100
during grading we can

02:50:41.100 --> 02:50:43.879
preserve one we certainly will but those are scheduled to

02:50:43.879 --> 02:50:45.879
come out and this I

02:50:45.879 --> 02:50:49.809
don't have the exact number but this significantly or

02:50:49.809 --> 02:50:51.299
notably exceeds the

02:50:51.299 --> 02:50:54.450
city's minimum requirements for tree preservation. We're

02:50:54.450 --> 02:50:55.079
not having to

02:50:55.079 --> 02:50:58.329
mitigate any trees we're able to meet the preservation

02:50:58.329 --> 02:50:59.959
requirements. It looks

02:50:59.959 --> 02:51:03.139
like they're all congested in one area I mean the ones that

02:51:03.139 --> 02:51:04.200
are not along this

02:51:04.200 --> 02:51:07.879
entire side and along the side that we're on all the trees

02:51:07.879 --> 02:51:08.520
are coming out it

02:51:08.520 --> 02:51:12.120
looks like and I'm concerned about that both from aesthet

02:51:12.120 --> 02:51:13.079
ically but I'm also

02:51:13.079 --> 02:51:20.590
concerned about it in terms of any kind of water direction.

02:51:20.590 --> 02:51:22.959
All the water is

02:51:22.959 --> 02:51:26.110
going to drain towards the stream from either side it's not

02:51:26.110 --> 02:51:26.520
going to go back

02:51:26.520 --> 02:51:31.360
towards the lots. This has to do with the grading some of

02:51:31.360 --> 02:51:32.079
these are coming out

02:51:32.079 --> 02:51:35.780
because they're gonna end up being in TexDOT right away and

02:51:35.780 --> 02:51:37.280
as these houses

02:51:37.280 --> 02:51:42.709
are moved in the future and this is regraded is we haven't

02:51:42.709 --> 02:51:43.879
upfront identified

02:51:43.879 --> 02:51:49.000
a way to preserve and save those particular trees.

02:51:49.000 --> 02:51:50.079
Obviously when you got

02:51:50.079 --> 02:51:57.159
some in the middle of the street we can't save those and

02:51:57.159 --> 02:51:58.680
and this is going

02:51:58.680 --> 02:52:01.319
to save more. I guess another thing back to your question

02:52:01.319 --> 02:52:02.760
Mr. Beck in the

02:52:02.760 --> 02:52:13.549
workshop. Oh I wasn't thinking about the TV sorry. You know

02:52:13.549 --> 02:52:15.360
if if we were to

02:52:15.360 --> 02:52:22.309
develop and not get the ESA one consideration would be to

02:52:22.309 --> 02:52:23.639
not grade

02:52:23.639 --> 02:52:27.020
bring in dirt to save trees to cut the lots in half so we

02:52:27.020 --> 02:52:28.239
could double the

02:52:28.239 --> 02:52:30.799
number of lots and get it all in there so I mean from

02:52:30.799 --> 02:52:32.219
economic and Mr. Key is

02:52:32.219 --> 02:52:35.399
not that type of person but from economic perspective he

02:52:35.399 --> 02:52:36.719
could jam lots

02:52:36.719 --> 02:52:40.270
in here and get rid of those trees and not touch the flood

02:52:40.270 --> 02:52:41.600
plain at all and meet

02:52:41.600 --> 02:52:44.780
the counts even with the old zoning. So you're saying the

02:52:44.780 --> 02:52:47.000
if I may chair that

02:52:47.000 --> 02:52:53.899
all the green trees that are staying meet the minimum tree

02:52:53.899 --> 02:52:53.920
per tree

02:52:53.920 --> 02:52:57.209
preservation requirement or the mitigation? Yes if I

02:52:57.209 --> 02:52:58.440
remember correctly

02:52:58.440 --> 02:53:04.030
we're required to save or mitigate 25% of the trees and we

02:53:04.030 --> 02:53:06.040
could mitigate 12

02:53:06.040 --> 02:53:09.559
and a half percent but we're able to save I want to say 35-

02:53:09.559 --> 02:53:11.600
40% we're above

02:53:11.600 --> 02:53:15.559
the 25%. These red ones you're removing are some of these

02:53:15.559 --> 02:53:17.239
heritage and native

02:53:17.239 --> 02:53:22.940
trees? Our tree preservation plans typically go in with

02:53:22.940 --> 02:53:23.680
their plants and I

02:53:23.680 --> 02:53:27.610
don't have that information. I mean there's always

02:53:27.610 --> 02:53:28.959
unfortunately some

02:53:28.959 --> 02:53:32.639
pecans and nouns and not just hackberries and mesquites.

02:53:32.639 --> 02:53:33.559
But they're

02:53:33.559 --> 02:53:36.739
all the red ones or six inches in diameter or bigger? Yes

02:53:36.739 --> 02:53:37.639
all of the trees

02:53:37.639 --> 02:53:40.840
on this side are six inches in diameter and larger. Okay

02:53:40.840 --> 02:53:43.120
now as you build the

02:53:43.120 --> 02:53:47.440
homes there will you be putting trees in? Oh definitely

02:53:47.440 --> 02:53:48.440
that's part of the city

02:53:48.440 --> 02:53:52.709
code requirement street trees and residential trees. How

02:53:52.709 --> 02:53:53.479
many trees would

02:53:53.479 --> 02:53:58.899
you say per lot would you be? Two to three including the

02:53:58.899 --> 02:54:01.360
street tree?

02:54:03.000 --> 02:54:05.770
I expect these lots are definitely gonna have two trees per

02:54:05.770 --> 02:54:06.920
lot for the street

02:54:06.920 --> 02:54:10.909
trees and I expect there'll be two trees or so planted on

02:54:10.909 --> 02:54:12.760
each yard. You need to

02:54:12.760 --> 02:54:16.360
get the house plans. One thing we're not doing is we're not

02:54:16.360 --> 02:54:17.520
overgrading a lot of

02:54:17.520 --> 02:54:21.690
the lots so that Kent can come in with a custom home or

02:54:21.690 --> 02:54:22.879
whoever builder comes in

02:54:22.879 --> 02:54:26.680
with a custom home instead of building a big square pad

02:54:26.680 --> 02:54:28.079
just build a pad that

02:54:28.079 --> 02:54:30.159
meets the house and if you can save a tree you have more

02:54:30.159 --> 02:54:31.020
opportunity to do

02:54:31.020 --> 02:54:33.879
that. I wonder if I could ask too and I was gonna mention

02:54:33.879 --> 02:54:34.959
this at the end of our

02:54:34.959 --> 02:54:37.909
meeting but when you put your tree protection fence up that

02:54:37.909 --> 02:54:38.600
orange fence

02:54:38.600 --> 02:54:42.010
yes any chance you could put that out at the drip line so

02:54:42.010 --> 02:54:43.440
you don't when you're

02:54:43.440 --> 02:54:45.909
when you're developing your lot you don't cut into the root

02:54:45.909 --> 02:54:46.879
systems like. For

02:54:46.879 --> 02:54:51.479
the code it is supposed to be put at the drip line. Okay I

02:54:51.479 --> 02:54:52.360
kind of thought it was.

02:54:52.360 --> 02:54:56.680
The Kent key is perfect and they will be put there but okay

02:54:56.680 --> 02:54:57.079
knows they're

02:54:57.079 --> 02:55:01.280
supposed to be and he wants them there. Good enough.

02:55:01.280 --> 02:55:05.280
If you could just step up to the microphone.

02:55:05.280 --> 02:55:08.459
The plant that was shown at the first that had more of this

02:55:08.459 --> 02:55:11.909
drawn out in phase one, phase two, is there a way we can

02:55:11.909 --> 02:55:13.280
get a copy of that?

02:55:13.280 --> 02:55:18.700
It's available online currently but we can certainly yeah

02:55:18.700 --> 02:55:19.399
okay you can get with

02:55:19.399 --> 02:55:22.579
Haley and she can provide that to you. Okay so we're

02:55:22.579 --> 02:55:23.879
basically all the trees

02:55:23.879 --> 02:55:26.610
behind us are gonna be cut down is what we're looking at. I

02:55:26.610 --> 02:55:28.920
'm not able to I don't

02:55:28.920 --> 02:55:33.040
know what this the process is here we didn't fill out a

02:55:33.040 --> 02:55:34.639
plus or minus on

02:55:34.639 --> 02:55:36.569
whether to do it because we were coming to the meeting are

02:55:36.569 --> 02:55:37.319
we supposed to turn

02:55:37.319 --> 02:55:40.399
that in afterwards? On the blue card you can write support

02:55:40.399 --> 02:55:41.120
or opposition and be

02:55:41.120 --> 02:55:47.000
filed with us. Thanks. Christian Beck. Just to answer Mr.

02:55:47.000 --> 02:55:48.600
Weisenhut's concern about

02:55:48.600 --> 02:55:51.780
not getting a notice I don't think they sent notices out on

02:55:51.780 --> 02:55:53.879
it on this AESA

02:55:53.879 --> 02:55:57.290
right they would do that on the zoning but they all didn't

02:55:57.290 --> 02:55:58.319
send notices out for

02:55:58.319 --> 02:56:02.250
the you did okay my mistake. The same notification

02:56:02.250 --> 02:56:03.360
procedures followed for an

02:56:03.360 --> 02:56:06.920
alternative ESA plan. Okay I stand corrected thank you.

02:56:06.920 --> 02:56:10.500
Commissioner Ellis. Thank You Chair. Haley while you're up

02:56:10.500 --> 02:56:12.000
on on that topic can you

02:56:12.000 --> 02:56:18.569
address the gentleman's concern in the area to the north

02:56:18.569 --> 02:56:20.559
why perhaps that block

02:56:20.559 --> 02:56:27.860
did not get notification on regency? So the the 200 foot

02:56:27.860 --> 02:56:30.440
letter would have only

02:56:30.440 --> 02:56:33.290
hit these the homes on the south side all of these

02:56:33.290 --> 02:56:34.879
addresses would have had

02:56:34.879 --> 02:56:38.090
notices sent to them we use the county's current most

02:56:38.090 --> 02:56:39.879
recent you know tax roll to

02:56:39.879 --> 02:56:44.979
obtain our addresses so we have a receipt showing that all

02:56:44.979 --> 02:56:45.600
the postcards

02:56:45.600 --> 02:56:53.420
were sent. Okay. Is there anyone else who likes to speak on

02:56:53.420 --> 02:56:55.920
this item? Ma'am was

02:56:55.920 --> 02:56:59.309
first in the front and so forth. If you could state your

02:56:59.309 --> 02:57:00.680
name and address for the

02:57:00.680 --> 02:57:04.120
record. Okay I'm Stacey Beavers I'm at 121 Meadowlands

02:57:04.120 --> 02:57:06.399
Drive so I'm literally

02:57:06.399 --> 02:57:10.000
right next door to where all this is going to start. I

02:57:10.000 --> 02:57:11.479
missed the meeting on

02:57:11.479 --> 02:57:15.840
September 5th that I think the engineer addressed. I know

02:57:15.840 --> 02:57:17.079
some people said they

02:57:17.079 --> 02:57:20.420
got cards my card actually came on September 10th so I

02:57:20.420 --> 02:57:21.840
missed that meeting

02:57:21.840 --> 02:57:24.309
and so I wanted to address just real quickly a couple of

02:57:24.309 --> 02:57:25.079
questions that I

02:57:25.079 --> 02:57:28.170
might have been able to ask him at that time but didn't get

02:57:28.170 --> 02:57:29.239
an opportunity since

02:57:29.239 --> 02:57:34.629
I didn't get the card. I spoke with Kent Key last summer

02:57:34.629 --> 02:57:36.600
and asked him a little

02:57:36.600 --> 02:57:39.370
bit about this development because they started bringing in

02:57:39.370 --> 02:57:40.120
just trucks and

02:57:40.120 --> 02:57:43.879
trucks and trucks of dirt from 7 in the morning till 6 at

02:57:43.879 --> 02:57:45.440
night and they were

02:57:45.440 --> 02:57:49.370
literally every five minutes just coming in and out in and

02:57:49.370 --> 02:57:50.040
out in and out and

02:57:50.040 --> 02:57:52.790
everybody was in and up roars and then all of a sudden from

02:57:52.790 --> 02:57:54.079
what I heard they

02:57:54.079 --> 02:57:57.260
got a cease and desist I don't know if that's a fact or not

02:57:57.260 --> 02:57:58.680
but then I saw him

02:57:58.680 --> 02:58:01.360
one day and I asked him what was going on and he said he

02:58:01.360 --> 02:58:02.479
was working with the

02:58:02.479 --> 02:58:05.659
city to get that development going and I'm very curious

02:58:05.659 --> 02:58:06.799
because my husband and

02:58:06.799 --> 02:58:09.979
I are reaching a point where our kids are grown and we want

02:58:09.979 --> 02:58:11.879
to downsize so I

02:58:11.879 --> 02:58:15.809
asked him you know what the situation was and how soon that

02:58:15.809 --> 02:58:17.639
would be coming. He

02:58:17.639 --> 02:58:20.819
indicated that he would have was currently fighting with

02:58:20.819 --> 02:58:21.520
the city about

02:58:21.520 --> 02:58:25.959
making that an HOA so my first question is do you know if

02:58:25.959 --> 02:58:27.360
that subdivision is

02:58:27.360 --> 02:58:33.670
going to have an HOA? Yes, Mr. Allison. Because we

02:58:33.670 --> 02:58:35.200
currently do not and that is

02:58:35.200 --> 02:58:38.149
one really nice thing about our subdivision and it is a big

02:58:38.149 --> 02:58:38.840
attraction

02:58:38.840 --> 02:58:42.170
to people because so many of these subdivisions that are

02:58:42.170 --> 02:58:43.360
going in have

02:58:43.360 --> 02:58:46.540
HOAs and there are good things about them but there are

02:58:46.540 --> 02:58:47.319
also a lot of bad

02:58:47.319 --> 02:58:52.399
things about them so I'm curious. This development will not

02:58:52.399 --> 02:58:54.760
have an HOA. There are not any

02:58:54.760 --> 02:58:58.829
common lots. The drainage will be developed dedicated to

02:58:58.829 --> 02:58:59.559
the city for city

02:58:59.559 --> 02:59:03.920
maintenance. When Mr. Key was bringing in those loads of

02:59:03.920 --> 02:59:05.120
dirt that was about

02:59:05.120 --> 02:59:11.200
20,000 yards. He had a stockpiling permit. He was doing

02:59:11.200 --> 02:59:13.479
some mowing in the ESA so

02:59:13.479 --> 02:59:17.079
we got stopped for that momentarily but it wasn't but he

02:59:17.079 --> 02:59:17.719
didn't really get a

02:59:17.719 --> 02:59:21.770
cease and desist but there was an issue there and no that's

02:59:21.770 --> 02:59:22.879
all understandable

02:59:22.879 --> 02:59:25.719
probably. There is a certain amount of truth to every rumor

02:59:25.719 --> 02:59:27.079
unfortunately but

02:59:27.079 --> 02:59:31.399
that's what occurred and primarily with construction one of

02:59:31.399 --> 02:59:32.280
the reasons we're

02:59:32.280 --> 02:59:36.069
putting this temporary road where this is so we can do more

02:59:36.069 --> 02:59:36.879
access from this

02:59:36.879 --> 02:59:40.260
direction and not need to come. Believe me he remembers all

02:59:40.260 --> 02:59:41.600
the calls he got from

02:59:41.600 --> 02:59:45.319
that delivery. Okay so and to that maybe you can just stay

02:59:45.319 --> 02:59:46.440
and answer. Do you know

02:59:46.440 --> 02:59:49.620
yet what the minimum square footage of the homes in that

02:59:49.620 --> 02:59:50.799
subdivision are going

02:59:50.799 --> 02:59:54.729
to be required to be? There's no minimum being placed upon

02:59:54.729 --> 02:59:55.520
them but just because

02:59:55.520 --> 03:00:00.399
of the cost and the size of the lots. I think we're looking

03:00:00.399 --> 03:00:01.959
Kent has told me in

03:00:01.959 --> 03:00:05.639
the 500,000 a million dollar range on the home prices,

03:00:05.639 --> 03:00:08.000
values. Okay and will you be

03:00:08.000 --> 03:00:11.790
able to bring your own builder? Use your own builder or is

03:00:11.790 --> 03:00:12.799
he going to be the

03:00:12.799 --> 03:00:17.649
primary builder in the subdivision or? These lots he'll

03:00:17.649 --> 03:00:18.719
build some of them they

03:00:18.719 --> 03:00:21.600
will be for sale. I don't know if he has enough commitments

03:00:21.600 --> 03:00:22.520
to take them all or

03:00:22.520 --> 03:00:26.989
not but I'm sure he would entertain an offer. Okay and do

03:00:26.989 --> 03:00:29.120
we have any idea based

03:00:29.120 --> 03:00:33.319
on the size of the lots the price ranges of the lots? Oh

03:00:33.319 --> 03:00:36.360
the lots themselves I

03:00:36.360 --> 03:00:41.579
would like a starting range for the smallest lot to the I'm

03:00:41.579 --> 03:00:42.600
guessing but I

03:00:42.600 --> 03:00:44.790
would say you're in the hundred and fifty to four hundred

03:00:44.790 --> 03:00:45.520
thousand dollar

03:00:45.520 --> 03:00:47.670
range. I mean there's a house up a lot up here in the

03:00:47.670 --> 03:00:48.760
corner is gonna be thirty

03:00:48.760 --> 03:00:51.719
thousand square feet so you know there's a three hundred

03:00:51.719 --> 03:00:52.879
four hundred thousand

03:00:52.879 --> 03:00:55.360
dollar lot right there. Particularly if he's able to save

03:00:55.360 --> 03:00:56.760
those trees as he plans.

03:00:56.760 --> 03:01:00.739
Do you know based on where we stand today when those lots

03:01:00.739 --> 03:01:02.479
might start being

03:01:02.479 --> 03:01:07.239
sold and therefore some of us get an idea of when

03:01:07.239 --> 03:01:08.559
construction is going to

03:01:08.559 --> 03:01:11.030
start so that we have an idea of when the commercial

03:01:11.030 --> 03:01:12.200
vehicles are going to be

03:01:12.200 --> 03:01:15.350
coming in and out of there and you mentioned also that you

03:01:15.350 --> 03:01:15.920
're gonna be

03:01:15.920 --> 03:01:21.040
bringing in 60,000 yards of dirt. Yes. Is that going to

03:01:21.040 --> 03:01:22.719
come off of Country Club

03:01:22.719 --> 03:01:25.319
Road or is that gonna come through Meadowlands like that

03:01:25.319 --> 03:01:26.479
other dirt did or?

03:01:26.479 --> 03:01:29.309
Again he'll try and come down Country Club Road with it he

03:01:29.309 --> 03:01:30.319
's actually getting

03:01:30.319 --> 03:01:34.850
this from a road construction project. I would expect all

03:01:34.850 --> 03:01:36.620
the improvements to be

03:01:36.620 --> 03:01:40.870
completed and the plats filed and lots for sale sometime

03:01:40.870 --> 03:01:42.600
next summer. In the

03:01:42.600 --> 03:01:45.059
meantime though I'd say by the first of the year he might

03:01:45.059 --> 03:01:45.680
be able to take

03:01:45.680 --> 03:01:49.750
pre-sales but he can't officially sell a lot until it's a

03:01:49.750 --> 03:01:51.120
real lot. Okay.

03:01:51.120 --> 03:01:53.500
Okay. I think that was all of my questions. Thank you so

03:01:53.500 --> 03:01:53.600
much.

03:01:53.600 --> 03:01:56.959
Fantastic thank you both. Thank you.

03:01:57.639 --> 03:02:02.059
This is a public hearing sir what are you wanting to speak?

03:02:02.059 --> 03:02:03.520
I do just fill a

03:02:03.520 --> 03:02:06.489
card afterwards and state your name and address for the

03:02:06.489 --> 03:02:08.200
record. Yes my name is

03:02:08.200 --> 03:02:12.350
Chris Beggs and I'm at 401 Regency Court right across the

03:02:12.350 --> 03:02:15.159
street from Jim.

03:02:15.159 --> 03:02:20.750
We have the property that aligns actually where the

03:02:20.750 --> 03:02:21.479
development is

03:02:21.479 --> 03:02:25.309
going on. You can't let me see. If you use the mouse we can

03:02:25.309 --> 03:02:29.040
see that. We are right

03:02:29.040 --> 03:02:34.469
here. So what I'm looking at and I guess the concern is is

03:02:34.469 --> 03:02:35.879
that we have trees all

03:02:35.879 --> 03:02:38.559
of these trees and I know that they're going to be taking

03:02:38.559 --> 03:02:39.600
some of these trees

03:02:39.600 --> 03:02:44.129
out. Well miss I lost my pointer but to the back of the

03:02:44.129 --> 03:02:45.079
property there on the

03:02:45.079 --> 03:02:49.010
south side we've got a beautiful tree line that runs along

03:02:49.010 --> 03:02:49.520
right through

03:02:49.520 --> 03:02:53.799
there and I know that developers they like taking this

03:02:53.799 --> 03:02:55.159
stuff out and you had

03:02:55.159 --> 03:02:58.139
mentioned the gentleman here had mentioned about trees

03:02:58.139 --> 03:02:59.000
being taken out

03:02:59.000 --> 03:03:03.250
that I guess the ones that are tagged are over six inches I

03:03:03.250 --> 03:03:04.520
guess in diameter.

03:03:04.520 --> 03:03:08.569
Well there's some of them back there that are under you

03:03:08.569 --> 03:03:10.079
know about six inches

03:03:10.079 --> 03:03:13.899
or so that they they offer quite a bit of buffer for it. I

03:03:13.899 --> 03:03:15.159
think I speak for

03:03:15.159 --> 03:03:20.590
everyone that's on that that property line there that I

03:03:20.590 --> 03:03:22.440
guess the concern is

03:03:22.440 --> 03:03:25.950
we have trees that will be right on that property line and

03:03:25.950 --> 03:03:27.120
I'm trying to figure

03:03:27.120 --> 03:03:30.610
out is that are they planning on taking those trees out I

03:03:30.610 --> 03:03:31.680
mean if or is there

03:03:31.680 --> 03:03:34.510
going to be like a you know they're going to come off of

03:03:34.510 --> 03:03:35.600
that property line

03:03:35.600 --> 03:03:38.799
before they start taking trees out because that could wipe

03:03:38.799 --> 03:03:39.639
out quite a bit

03:03:39.639 --> 03:03:42.479
of that vegetation. Mr. Austin could certainly answer that

03:03:42.479 --> 03:03:43.920
I'd imagine Mr. Key

03:03:43.920 --> 03:03:47.420
would want to keep those for property value but if there's

03:03:47.420 --> 03:03:48.600
plans to remove

03:03:48.600 --> 03:03:54.680
them. Again a lot of these trees we're not even sure if

03:03:54.680 --> 03:03:55.879
they're on our lot or

03:03:55.879 --> 03:03:59.399
on the neighbors lot they could be under six inches but we

03:03:59.399 --> 03:04:00.799
have graded matching

03:04:00.799 --> 03:04:04.059
grade here so we can stay out here and protect the trees

03:04:04.059 --> 03:04:05.200
along here save and

03:04:05.200 --> 03:04:08.879
accept those in the immediate area of the channel where we

03:04:08.879 --> 03:04:09.959
might have to do

03:04:09.959 --> 03:04:13.889
some extensive grading but particularly I guess is this

03:04:13.889 --> 03:04:15.360
your lot am I pointing

03:04:15.360 --> 03:04:20.040
correctly? Yes. I'll be hard-pressed to see why we'd have

03:04:20.040 --> 03:04:20.600
to take any of

03:04:20.600 --> 03:04:23.879
those trees out. Because our property line actually goes

03:04:23.879 --> 03:04:25.920
just on the other side of

03:04:25.920 --> 03:04:31.030
the creek actually on the west side extends just right over

03:04:31.030 --> 03:04:31.959
on the west side.

03:04:31.959 --> 03:04:35.540
Okay so you're close to the trees. Yeah. But still these

03:04:35.540 --> 03:04:36.719
trees in particular

03:04:36.719 --> 03:04:39.899
those are based on our grading plan I don't yeah I can't

03:04:39.899 --> 03:04:41.280
imagine those

03:04:41.280 --> 03:04:46.920
leading to come out. And that's that's been the most

03:04:46.920 --> 03:04:47.000
question I guess. Sure.

03:04:47.000 --> 03:04:51.000
Understood. Okay. Thank you. Thank you. You just fill out a

03:04:51.000 --> 03:04:53.360
blue card.

03:05:02.319 --> 03:05:08.389
Christian Ellis. Thank you Chair. Mr. Beggs. Excuse me sir.

03:05:08.389 --> 03:05:11.639
I'm just curious did you get a notification

03:05:11.639 --> 03:05:17.719
card in the mail? You did? No. Where are you in? I think we

03:05:17.719 --> 03:05:20.239
're in the 200. Okay so you're in the

03:05:20.239 --> 03:05:23.600
within the red line? Oh within the red line yeah right

03:05:23.600 --> 03:05:26.079
there. So but as far as I

03:05:26.079 --> 03:05:29.319
know I think I did and Steve got one too.

03:05:32.360 --> 03:05:35.360
[inaudible]

03:05:35.360 --> 03:05:38.709
For what it's worth I'm in the 500 and I was I got notified

03:05:38.709 --> 03:05:40.200
. You did? By both the

03:05:40.200 --> 03:05:46.639
city and by Mr. Allison's. So I was I was caught.

03:05:47.200 --> 03:05:52.079
Is anyone else wanting to speak on this matter? Yes ma'am.

03:05:52.079 --> 03:05:54.159
Again if you could just

03:05:54.159 --> 03:05:56.079
fill out a card when you're done and just state your name

03:05:56.079 --> 03:05:56.799
and address for the

03:05:56.799 --> 03:06:06.930
record. Hi I am Stephanie Watley and I live at 801 Regency

03:06:06.930 --> 03:06:08.920
Court so this first

03:06:08.920 --> 03:06:14.879
lot here on the south side. I think my question probably

03:06:14.879 --> 03:06:19.200
for Mr. Allison is also

03:06:19.200 --> 03:06:22.379
about the tree line but I was concerned when you were

03:06:22.379 --> 03:06:23.239
saying there's gonna be a

03:06:23.239 --> 03:06:27.940
temporary entrance. Could you show me where that's gonna be

03:06:27.940 --> 03:06:29.040
? Is that where the

03:06:29.040 --> 03:06:33.969
current that is that where that current like a little

03:06:33.969 --> 03:06:35.399
driveway is? Is that where

03:06:35.399 --> 03:06:39.329
the road is gonna be? Yes. Okay just pardon me for the

03:06:39.329 --> 03:06:40.680
microphone and for everybody's

03:06:40.680 --> 03:06:44.440
benefit. This road this gravel road that's existing it's

03:06:44.440 --> 03:06:46.559
probably a 150 feet

03:06:46.559 --> 03:06:50.629
or so off the property line is where the permanent road

03:06:50.629 --> 03:06:52.159
will go here and the

03:06:52.159 --> 03:06:56.239
temporary road here. Okay so when the permanent road is

03:06:56.239 --> 03:06:58.000
completed it will no

03:06:58.000 --> 03:07:00.770
longer go to Country Club from here it's gonna come down

03:07:00.770 --> 03:07:01.840
this direction is that

03:07:01.840 --> 03:07:04.709
correct? Yes it'll come down here and then line up with

03:07:04.709 --> 03:07:06.040
this street. Okay. We

03:07:06.040 --> 03:07:08.500
just don't know where along here because we don't know how

03:07:08.500 --> 03:07:09.079
much text on it's

03:07:09.079 --> 03:07:13.040
gonna take at this time. So once this road is complete

03:07:13.040 --> 03:07:14.440
there are plans to develop

03:07:14.440 --> 03:07:18.190
between Regency there will be a row of houses right here

03:07:18.190 --> 03:07:19.680
between the road and

03:07:19.680 --> 03:07:24.069
the tree line. Is that correct? That is correct. Okay so I

03:07:24.069 --> 03:07:27.399
know we're at risk you know some of

03:07:27.399 --> 03:07:30.079
our property is at risk with the easement through text on

03:07:30.079 --> 03:07:32.319
also so I was

03:07:32.319 --> 03:07:37.459
just interested to know what's your theory right now about

03:07:37.459 --> 03:07:38.040
where you may

03:07:38.040 --> 03:07:42.459
start developing. We've got about one I mean I don't know

03:07:42.459 --> 03:07:43.979
exactly how far the

03:07:43.979 --> 03:07:49.129
property is crossed. I have one I think they'll help show

03:07:49.129 --> 03:07:49.520
that.

03:07:49.520 --> 03:07:55.239
Oh that was easy.

03:08:00.120 --> 03:08:04.239
This shows our phase one and there's where the creek comes

03:08:04.239 --> 03:08:06.079
through there's

03:08:06.079 --> 03:08:10.149
Country Club Road it looks like there's probably three lots

03:08:10.149 --> 03:08:11.479
in here that we're

03:08:11.479 --> 03:08:15.270
not developing now but we will have a row of lots along

03:08:15.270 --> 03:08:16.799
here. Okay. And then in

03:08:16.799 --> 03:08:19.270
the future depending on text dot there could be two or

03:08:19.270 --> 03:08:20.280
three lots back here.

03:08:20.280 --> 03:08:23.639
Okay I gotcha and then again my concern is just for the

03:08:23.639 --> 03:08:25.600
tree line you know I

03:08:25.600 --> 03:08:29.000
know just because ever since this has become an issue I've

03:08:29.000 --> 03:08:30.159
gone to the back to

03:08:30.159 --> 03:08:33.639
try to look at where my trees end versus where the other

03:08:33.639 --> 03:08:35.000
ones begin you know and

03:08:35.000 --> 03:08:37.889
I can see that our tree line is nice and thick you know and

03:08:37.889 --> 03:08:38.879
there was so much

03:08:38.879 --> 03:08:42.059
talk before about the previous development about

03:08:42.059 --> 03:08:43.040
maintaining the

03:08:43.040 --> 03:08:45.930
buffers to help with the value of the homes. I mean you

03:08:45.930 --> 03:08:47.120
know we're really in

03:08:47.120 --> 03:08:51.409
this you know this neighborhood is bordering you know two

03:08:51.409 --> 03:08:52.399
nice neighborhoods

03:08:52.399 --> 03:08:55.049
obviously and it's in our best interest for everybody to

03:08:55.049 --> 03:08:56.079
keep as many trees as

03:08:56.079 --> 03:08:59.629
we can so I was just it makes me nervous that they don't

03:08:59.629 --> 03:09:00.319
show up on the map

03:09:00.319 --> 03:09:04.479
because then you know when we see the tree mitigation it

03:09:04.479 --> 03:09:05.520
doesn't address the

03:09:05.520 --> 03:09:08.889
south side of it at all so I was just curious is there any

03:09:08.889 --> 03:09:10.000
further information

03:09:10.000 --> 03:09:15.430
we'll get that maybe shows our tree line? To be honest no

03:09:15.430 --> 03:09:18.920
that's uh we are done

03:09:18.920 --> 03:09:23.190
this to meet city requirements and I'm trying to get back

03:09:23.190 --> 03:09:24.040
to another other than

03:09:24.040 --> 03:09:27.969
an aerial that shows these trees along here and the fact

03:09:27.969 --> 03:09:28.920
that Mr. Key is

03:09:28.920 --> 03:09:33.450
bringing in 80,000 and it costs money to remove a tree and

03:09:33.450 --> 03:09:34.719
we've graded so those

03:09:34.719 --> 03:09:37.940
wouldn't have to be removed that's about the best assur

03:09:37.940 --> 03:09:39.280
ances I can give you at

03:09:39.280 --> 03:09:42.719
this time. Okay so from this perspective when you were

03:09:42.719 --> 03:09:43.719
talking about two or three

03:09:43.719 --> 03:09:47.680
lots about where do you think is this is my lot right here

03:09:47.680 --> 03:09:48.639
so where are you

03:09:48.639 --> 03:09:51.100
thinking right now for the TexDOT allotment where do you

03:09:51.100 --> 03:09:51.399
think you'll begin?

03:09:51.399 --> 03:09:55.729
Well we're gonna stop here and we think TexDOT is probably

03:09:55.729 --> 03:09:56.719
trying to come

03:09:56.719 --> 03:10:02.409
through here I'm guessing they might do a little bit of

03:10:02.409 --> 03:10:04.479
geometrical creativity

03:10:04.479 --> 03:10:09.389
through here to avoid as much as possible but you know with

03:10:09.389 --> 03:10:10.360
here because

03:10:10.360 --> 03:10:14.290
of these homes and the big front yards there we think they

03:10:14.290 --> 03:10:15.399
'll maximize their

03:10:15.399 --> 03:10:19.920
right-of-way taking in our area. Okay do you know a date on

03:10:19.920 --> 03:10:21.239
like phase one and

03:10:21.239 --> 03:10:25.520
phase two? Again phase one we hope to break ground right

03:10:25.520 --> 03:10:26.319
after the first of

03:10:26.319 --> 03:10:29.840
the year and be completed next summer sometime. You'll be

03:10:29.840 --> 03:10:31.200
completed with the

03:10:31.200 --> 03:10:33.719
lots will become available? With all the streets yes then

03:10:33.719 --> 03:10:34.760
they can start building

03:10:34.760 --> 03:10:38.479
homes I can't predict when the homes will be completed if

03:10:38.479 --> 03:10:39.360
the economy stays

03:10:39.360 --> 03:10:42.870
the way it is I wouldn't be surprised if it's built out in

03:10:42.870 --> 03:10:44.319
two years. And then is

03:10:44.319 --> 03:10:47.500
there a plan for the beginning of phase two? That's all up

03:10:47.500 --> 03:10:49.079
to TexDOT until that

03:10:49.079 --> 03:10:53.440
road gets taken care of so when you sell your right-of-way

03:10:53.440 --> 03:10:54.680
to TexDOT we're

03:10:54.680 --> 03:11:01.399
probably right behind you. Okay thank you both. Yes ma'am.

03:11:01.399 --> 03:11:06.069
State your name and address for the record. My name is Man

03:11:06.069 --> 03:11:07.520
al Omari I live in

03:11:07.520 --> 03:11:15.079
201 Meduland which is here basically and we did not receive

03:11:15.079 --> 03:11:16.520
a card about

03:11:16.520 --> 03:11:23.479
anything. I don't know if we were exactly 200 or a little

03:11:23.479 --> 03:11:24.479
bit more but we

03:11:24.479 --> 03:11:29.139
didn't receive either 500 or 200 and I was worried about

03:11:29.139 --> 03:11:30.520
the traffic because

03:11:30.520 --> 03:11:35.329
where we our house is here so that big pile of dirt is

03:11:35.329 --> 03:11:37.280
right here and that

03:11:37.280 --> 03:11:41.000
means and there's nothing right now this is an empty space

03:11:41.000 --> 03:11:42.280
so you can imagine

03:11:42.280 --> 03:11:48.440
how it's gonna be from now on I'm just a little bit scared

03:11:48.440 --> 03:11:49.719
about the amount of

03:11:49.719 --> 03:11:54.670
traffic the amount of construction also all of a sudden the

03:11:54.670 --> 03:11:56.079
value of our house

03:11:56.079 --> 03:12:00.129
because our house is from those houses the big you know the

03:12:00.129 --> 03:12:01.399
bigger houses so

03:12:01.399 --> 03:12:04.639
how is that that new construction how is that gonna impact

03:12:04.639 --> 03:12:05.879
the value of our house

03:12:05.879 --> 03:12:09.690
in addition to the traffic and the construction some of

03:12:09.690 --> 03:12:10.920
course the trees

03:12:10.920 --> 03:12:14.100
all of them are gonna be gone and no empty space which is I

03:12:14.100 --> 03:12:14.920
mean I know I

03:12:14.920 --> 03:12:18.989
understand there will be no construction but is that gonna

03:12:18.989 --> 03:12:20.479
impact our the value

03:12:20.479 --> 03:12:23.290
of our houses because you know the value for all of those

03:12:23.290 --> 03:12:24.239
houses they have

03:12:24.239 --> 03:12:28.229
certain value so how is that gonna impact I can invite mr.

03:12:28.229 --> 03:12:29.000
Allison up to speak

03:12:29.000 --> 03:12:32.709
about the traffic flow for construction are they using

03:12:32.709 --> 03:12:33.879
metal lands to access

03:12:33.879 --> 03:12:36.649
construction and I don't know if you're an authority to

03:12:36.649 --> 03:12:37.879
speak on property values

03:12:37.879 --> 03:12:46.020
per se but if you have any insight to that when it comes to

03:12:46.020 --> 03:12:47.920
traffic for

03:12:47.920 --> 03:12:51.159
construction that traffic that's under Kent Keys control

03:12:51.159 --> 03:12:52.639
will be coming off

03:12:52.639 --> 03:12:55.399
Country Club Road primarily the traffic for the

03:12:55.399 --> 03:12:56.879
construction of the subdivision

03:12:56.879 --> 03:13:00.809
when it gets to the traffic for home construction these

03:13:00.809 --> 03:13:01.799
streets will be

03:13:01.799 --> 03:13:04.649
opened up so more likely they would come I keep pointing

03:13:04.649 --> 03:13:06.000
with my finger I'm sorry

03:13:06.000 --> 03:13:09.180
more likely they would come down Country Club Road because

03:13:09.180 --> 03:13:10.000
that's going to be a

03:13:10.000 --> 03:13:12.590
faster easier access instead of trying to be entered

03:13:12.590 --> 03:13:13.959
through this development

03:13:13.959 --> 03:13:16.790
but I can't say there wouldn't be a plumber or a roofer

03:13:16.790 --> 03:13:17.879
somebody that might

03:13:17.879 --> 03:13:20.750
come through here on the individual home constructions as

03:13:20.750 --> 03:13:22.200
far as home values

03:13:22.200 --> 03:13:25.379
we're looking at homes equal to or greater than these in

03:13:25.379 --> 03:13:26.319
values I think the

03:13:26.319 --> 03:13:31.299
comps would stay up if we were to go with an alternative

03:13:31.299 --> 03:13:32.319
development that

03:13:32.319 --> 03:13:34.909
could be allowed with the zoning with smaller homes the

03:13:34.909 --> 03:13:35.959
comps would tend to go

03:13:35.959 --> 03:13:39.360
down so I think what's being planned here will certainly

03:13:39.360 --> 03:13:40.639
not hurt if possibly

03:13:40.639 --> 03:13:44.270
help but that is the absolute limit of my expertise when it

03:13:44.270 --> 03:13:45.399
comes to appraisals

03:13:45.399 --> 03:13:52.629
thank you very much any other individuals want to speak on

03:13:52.629 --> 03:13:54.920
this item

03:13:57.600 --> 03:14:00.829
seeing none I will close the public hearing and open it for

03:14:00.829 --> 03:14:02.399
discussion or

03:14:02.399 --> 03:14:12.639
motion on the board commissioner Ellis I'm gonna make a

03:14:12.639 --> 03:14:13.600
motion to approve with

03:14:13.600 --> 03:14:16.979
just a couple comments thank you staff and Allison

03:14:16.979 --> 03:14:18.760
engineering group for doing

03:14:18.760 --> 03:14:21.280
great presentation it could have been a very complicated

03:14:21.280 --> 03:14:22.399
subject and you made it

03:14:22.399 --> 03:14:25.579
easy to assess and look into and understand exactly what we

03:14:25.579 --> 03:14:26.360
're voting on

03:14:26.360 --> 03:14:30.489
here today so thank you very much and with that I will move

03:14:30.489 --> 03:14:31.079
to approve

03:14:31.079 --> 03:14:39.940
Commissioner Sanchez I'd like to say you made a great

03:14:39.940 --> 03:14:43.760
presentation I think it

03:14:43.760 --> 03:14:46.940
helped a lot of people understand what was going on and

03:14:46.940 --> 03:14:49.200
they're on the grounds

03:14:49.200 --> 03:14:58.090
I'm gonna vote for it we are first in a second any

03:14:58.090 --> 03:15:02.879
discussion yes Haley with the

03:15:02.879 --> 03:15:09.559
four conditions okay thank you thank you Haley we have a

03:15:09.559 --> 03:15:11.040
motion and a second to

03:15:11.040 --> 03:15:14.719
approve with the four conditions seeing no discussion we'll

03:15:14.719 --> 03:15:15.600
call for a vote on

03:15:15.600 --> 03:15:28.139
the board the motion carries six zero with one absent that

03:15:28.139 --> 03:15:29.360
'll move us to our

03:15:29.360 --> 03:15:32.309
final hearing item for the evening thank you for everyone

03:15:32.309 --> 03:15:33.559
waiting on that item I

03:15:33.559 --> 03:15:37.540
know we have even a little kid waiting on us so we'll move

03:15:37.540 --> 03:15:38.760
on with haste to

03:15:38.760 --> 03:15:44.569
item 3d z 18 - 15 I'll open the public hearing and invite H

03:15:44.569 --> 03:15:45.000
aley for

03:15:45.000 --> 03:15:47.399
presentation

03:15:56.239 --> 03:16:01.670
all right good evening this is case as the 1815 for Audra O

03:16:01.670 --> 03:16:03.959
aks the request

03:16:03.959 --> 03:16:07.239
before you is to hold public hearing and consider making a

03:16:07.239 --> 03:16:07.920
recommendation to

03:16:07.920 --> 03:16:10.389
council regarding a request for a rezoning from

03:16:10.389 --> 03:16:11.760
neighborhood residential

03:16:11.760 --> 03:16:15.079
two districts to neighborhood residential for the site you

03:16:15.079 --> 03:16:15.520
can see

03:16:15.520 --> 03:16:18.989
outlined in yellow is just over 13 acres located on the

03:16:18.989 --> 03:16:20.120
south side of Audre

03:16:20.120 --> 03:16:24.209
Lane just west of Barbara Lane again the current zoning on

03:16:24.209 --> 03:16:25.479
the property you see

03:16:25.479 --> 03:16:27.950
here on the left is a neighborhood residential - so that

03:16:27.950 --> 03:16:28.600
would permit a

03:16:28.600 --> 03:16:31.239
maximum of two dwelling units per acre on the right you can

03:16:31.239 --> 03:16:32.040
see what the map

03:16:32.040 --> 03:16:34.500
would look like with the proposed zoning of NR for which

03:16:34.500 --> 03:16:35.360
would permit up to four

03:16:35.360 --> 03:16:40.000
units per acre the applicant did preside it provide a

03:16:40.000 --> 03:16:41.079
concept plan so although

03:16:41.079 --> 03:16:43.129
the zoning wouldn't be tied to this it does give you an

03:16:43.129 --> 03:16:44.159
idea of what they would

03:16:44.159 --> 03:16:46.909
hope to develop on the property should the rezoning be

03:16:46.909 --> 03:16:48.100
approved and I want to

03:16:48.100 --> 03:16:50.569
point out that north is oriented to the left side of the

03:16:50.569 --> 03:16:51.639
screen here the map

03:16:51.639 --> 03:16:54.819
didn't fit very well oriented the other way so what you can

03:16:54.819 --> 03:16:55.840
see here is Audre

03:16:55.840 --> 03:16:58.540
Lane on the north side of the property they do intend to

03:16:58.540 --> 03:16:59.479
extend Oak Valley

03:16:59.479 --> 03:17:02.360
Street through the property up to Audre as well as have a

03:17:02.360 --> 03:17:03.440
connection to another

03:17:03.440 --> 03:17:06.620
future neighborhood that is currently under preliminary

03:17:06.620 --> 03:17:07.840
platting adjoining

03:17:07.840 --> 03:17:11.229
them to the west they do have as you can see outlined in

03:17:11.229 --> 03:17:12.399
orange a number of

03:17:12.399 --> 03:17:15.629
single-family homes proposed the out lots outlined in blue

03:17:15.629 --> 03:17:16.479
would be proposed

03:17:16.479 --> 03:17:19.200
for duplexes and then there is a sizable portion of the

03:17:19.200 --> 03:17:20.399
property that would be

03:17:20.399 --> 03:17:23.329
that is proposed to our Parks Department currently to be a

03:17:23.329 --> 03:17:24.360
city park but could

03:17:24.360 --> 03:17:27.350
also be HOA maintained green space if for some reason the

03:17:27.350 --> 03:17:28.319
city is unable to

03:17:28.319 --> 03:17:32.989
accept that park property the code does outline two

03:17:32.989 --> 03:17:34.520
criteria for approval of a

03:17:34.520 --> 03:17:37.319
rezoning the first being does it conform to the future land

03:17:37.319 --> 03:17:38.159
use element of the

03:17:38.159 --> 03:17:40.959
Denton plan 2030 and second being is there adequate

03:17:40.959 --> 03:17:41.399
provision of

03:17:41.399 --> 03:17:45.379
infrastructure so looking at that first component the

03:17:45.379 --> 03:17:46.879
future land use designation

03:17:46.879 --> 03:17:51.120
for this area is low residential the intent of these areas

03:17:51.120 --> 03:17:51.680
is to have a

03:17:51.680 --> 03:17:54.299
maximum of four dwelling units per acre but to also

03:17:54.299 --> 03:17:55.680
accommodate a mixture of

03:17:55.680 --> 03:17:59.120
housing types and housing prices and to respect the you

03:17:59.120 --> 03:18:00.239
know the current

03:18:00.239 --> 03:18:03.420
development patterns in the area in our four we did find to

03:18:03.420 --> 03:18:04.440
be consistent with

03:18:04.440 --> 03:18:07.850
this it primarily permits single-family homes duplexes are

03:18:07.850 --> 03:18:08.680
permitted with a

03:18:08.680 --> 03:18:11.309
limitation that will look at a little more closely in the

03:18:11.309 --> 03:18:12.239
second and then it

03:18:12.239 --> 03:18:15.069
does fit within that maximum and I apologize this last line

03:18:15.069 --> 03:18:15.920
should say four

03:18:15.920 --> 03:18:20.500
dwelling units per acre within NR for so looking a little

03:18:20.500 --> 03:18:21.639
bit more about the

03:18:21.639 --> 03:18:24.389
zoning compatibility there is existing in our four both to

03:18:24.389 --> 03:18:25.200
the east and the

03:18:25.200 --> 03:18:27.909
south of this this development so this would be a

03:18:27.909 --> 03:18:29.680
continuation of that existing

03:18:29.680 --> 03:18:32.629
zoning pattern and our four as I mentioned is not only

03:18:32.629 --> 03:18:33.600
consistent with

03:18:33.600 --> 03:18:36.069
the future land use plan but also with the existing

03:18:36.069 --> 03:18:37.159
development pattern in this

03:18:37.159 --> 03:18:40.840
area in terms of use and the scale of use that's permitted

03:18:40.840 --> 03:18:42.200
so as I mentioned

03:18:42.200 --> 03:18:45.379
single-family is permitted by right duplexes do have a

03:18:45.379 --> 03:18:47.079
limitation that

03:18:47.079 --> 03:18:50.440
limitation has several criteria the first being that the

03:18:50.440 --> 03:18:51.479
lots containing

03:18:51.479 --> 03:18:53.979
those duplexes not immediately about the perimeter of the

03:18:53.979 --> 03:18:54.920
subdivision so as we

03:18:54.920 --> 03:18:57.579
saw in the concept plan the park the single-family homes on

03:18:57.579 --> 03:18:58.520
the south side and

03:18:58.520 --> 03:19:01.489
then the alleyway on the west side would prevent that

03:19:01.489 --> 03:19:02.840
immediate vicinity of

03:19:02.840 --> 03:19:06.770
duplexes abutting single-family it also requires that each

03:19:06.770 --> 03:19:07.879
duplex each half of

03:19:07.879 --> 03:19:10.500
the unit be on a separately platted lot so that they can be

03:19:10.500 --> 03:19:11.639
sold individually as

03:19:11.639 --> 03:19:15.040
a single-family residence and then it also requires conform

03:19:15.040 --> 03:19:15.760
ance with our

03:19:15.760 --> 03:19:19.340
single-family design standards in sub chapter 13 so each du

03:19:19.340 --> 03:19:20.719
plex is required to

03:19:20.719 --> 03:19:25.940
appear from the street as one unit the second criteria as I

03:19:25.940 --> 03:19:27.319
mentioned was the

03:19:27.319 --> 03:19:30.649
provision of infrastructure so there is access to the site

03:19:30.649 --> 03:19:32.000
provided off of Audre

03:19:32.000 --> 03:19:35.450
as well as the possibility of this connection at Oak Valley

03:19:35.450 --> 03:19:36.280
water and sewer

03:19:36.280 --> 03:19:38.750
which you can see here in a blue and red on the map

03:19:38.750 --> 03:19:40.360
respectively are available to

03:19:40.360 --> 03:19:45.200
the site off of Audre Lane notification was sent regarding

03:19:45.200 --> 03:19:46.280
this request through

03:19:46.280 --> 03:19:48.750
all of the required means in the newspaper signs were

03:19:48.750 --> 03:19:49.559
posted as well as

03:19:49.559 --> 03:19:52.840
the postcards and the 200-foot mailings we did receive

03:19:52.840 --> 03:19:54.559
several responses to this

03:19:54.559 --> 03:19:57.399
as you can see here and as provided to you in your backup

03:19:57.399 --> 03:19:58.639
the applicant did

03:19:58.639 --> 03:20:01.159
hold a neighborhood meeting on September 4th at the Civic

03:20:01.159 --> 03:20:01.879
Center there were

03:20:01.879 --> 03:20:04.649
multiple neighbors in attendance at that meeting some of

03:20:04.649 --> 03:20:06.079
the primary concerns I

03:20:06.079 --> 03:20:09.049
heard were over traffic cutting through on Oak Valley up to

03:20:09.049 --> 03:20:10.239
Audre as well as a

03:20:10.239 --> 03:20:15.360
duplex as being a new use introduced to the area staff is

03:20:15.360 --> 03:20:16.840
recommending approval

03:20:16.840 --> 03:20:19.219
of this request because we found it to be consistent with

03:20:19.219 --> 03:20:20.000
our two criteria for

03:20:20.000 --> 03:20:25.110
approval and I'd be happy to stand for any questions I do

03:20:25.110 --> 03:20:26.559
not see any questions

03:20:26.559 --> 03:20:30.760
of us right now of you Haley thank you for the presentation

03:20:30.760 --> 03:20:32.239
I believe the

03:20:32.239 --> 03:20:38.799
applicant is here and also has a presentation perfect is

03:20:38.799 --> 03:20:40.840
the applicant

03:20:40.840 --> 03:20:46.920
Sean Faulkner correct if you just state your name and your

03:20:46.920 --> 03:20:48.479
address you have 10

03:20:48.479 --> 03:20:51.319
minutes to present I won't need that long thank you very

03:20:51.319 --> 03:20:52.719
much my name is Sean

03:20:52.719 --> 03:20:57.079
Faulkner I reside here in Denton at 2713 Bissonnette Drive

03:20:57.079 --> 03:20:58.680
on the south side of

03:20:58.680 --> 03:21:03.500
town and I'm here to you know talk about our proper our

03:21:03.500 --> 03:21:05.479
project here in front of

03:21:05.479 --> 03:21:09.219
you you see the results of our neighborhood mean that we

03:21:09.219 --> 03:21:10.639
had most of

03:21:10.639 --> 03:21:14.569
the concerns that we had probably number one was you know

03:21:14.569 --> 03:21:15.180
parking along the

03:21:15.180 --> 03:21:19.239
street and bail would get fire access through and I believe

03:21:19.239 --> 03:21:20.360
the city back in

03:21:20.360 --> 03:21:24.799
March revised the standard roadway standards to widen out

03:21:24.799 --> 03:21:25.959
the street and we

03:21:25.959 --> 03:21:29.889
are planning to you know have those standards in our

03:21:29.889 --> 03:21:31.440
development to help

03:21:31.440 --> 03:21:35.879
that of course we also want you know fire protection and

03:21:35.879 --> 03:21:37.040
and and normal

03:21:37.040 --> 03:21:41.569
traffic to flow by and not feel crunched another concern of

03:21:41.569 --> 03:21:43.280
course with duplexes

03:21:43.280 --> 03:21:47.809
is rental property right now it's the intent that you know

03:21:47.809 --> 03:21:49.440
all the units will

03:21:49.440 --> 03:21:52.760
be owner occupied I know there's a development further down

03:21:52.760 --> 03:21:53.680
Audreau closer

03:21:53.680 --> 03:21:59.120
to 88 that is considered duplex but is 100% rental that is

03:21:59.120 --> 03:21:59.879
not what we're

03:21:59.879 --> 03:22:03.840
looking to do matter of fact you know for the duplex units

03:22:03.840 --> 03:22:04.520
we're looking at

03:22:04.520 --> 03:22:08.319
starting prices for each unit to be you know around 230 to

03:22:08.319 --> 03:22:09.479
140 thousand dollars

03:22:09.479 --> 03:22:12.879
you know and that's per unit that's not for both of us that

03:22:12.879 --> 03:22:15.239
's each side so we

03:22:15.239 --> 03:22:17.709
know we're looking for a little bit higher class you know

03:22:17.709 --> 03:22:18.319
development rather

03:22:18.319 --> 03:22:22.430
than just rental property and then a lot of people really

03:22:22.430 --> 03:22:23.799
can you know talk about

03:22:23.799 --> 03:22:28.559
the open space park you know as Haley mentioned you know we

03:22:28.559 --> 03:22:29.239
have approached the

03:22:29.239 --> 03:22:32.600
Parks Department about you know dedicating those to them

03:22:32.600 --> 03:22:32.879
they're

03:22:32.879 --> 03:22:34.959
currently evaluating at our site and I believe there's

03:22:34.959 --> 03:22:36.000
another site further down

03:22:36.000 --> 03:22:38.780
at the east that they're also looking at of course we're

03:22:38.780 --> 03:22:40.079
hoping that they'll take

03:22:40.079 --> 03:22:43.510
our site because I think it'll be a great addition to this

03:22:43.510 --> 03:22:44.399
side of town I

03:22:44.399 --> 03:22:48.069
know the neighbors around there would definitely love a

03:22:48.069 --> 03:22:50.959
park the trail master

03:22:50.959 --> 03:22:55.879
plan does call for you know widen sidewalks to go up and

03:22:55.879 --> 03:22:56.479
down Oak Valley

03:22:56.479 --> 03:23:00.409
and across Audreau so they'll be provide great access not

03:23:00.409 --> 03:23:02.040
only for our neighborhood

03:23:02.040 --> 03:23:05.450
but the neighbors that we're connecting to to get to it and

03:23:05.450 --> 03:23:07.479
then also minor

03:23:07.479 --> 03:23:11.829
concern was you know our duplexes were concerning actually

03:23:11.829 --> 03:23:12.680
we want them to be

03:23:12.680 --> 03:23:16.739
rear entry because you do duplex lots you know all you'll

03:23:16.739 --> 03:23:18.639
see is cars we want

03:23:18.639 --> 03:23:22.030
to keep that front area as nice and neat as we possibly can

03:23:22.030 --> 03:23:23.559
so we want to move you

03:23:23.559 --> 03:23:26.739
know the cars back into the back and in that case you know

03:23:26.739 --> 03:23:27.639
we'll have two car

03:23:27.639 --> 03:23:31.090
garages you know providing you know the four spaces that's

03:23:31.090 --> 03:23:32.479
required by the zoning

03:23:32.479 --> 03:23:36.000
ordinance is one of the concerns was you know putting a

03:23:36.000 --> 03:23:36.920
fence on the alley

03:23:36.920 --> 03:23:40.149
especially you know on the park and you know we want that

03:23:40.149 --> 03:23:41.360
to be oh feels open as

03:23:41.360 --> 03:23:44.889
possible you know you know not only for our residents but

03:23:44.889 --> 03:23:45.840
you know for other

03:23:45.840 --> 03:23:51.430
neighbors as well you know just kind of go through some of

03:23:51.430 --> 03:23:52.319
the you know

03:23:52.319 --> 03:23:55.290
requirements of in our four go a little bit a little bit

03:23:55.290 --> 03:23:56.479
further than what Haley

03:23:56.479 --> 03:23:59.219
mentioned you know it's typically so 20 foot setback you

03:23:59.219 --> 03:24:00.120
know we're planning on

03:24:00.120 --> 03:24:05.069
meeting that requirement lot coverage we're limited to 60%

03:24:05.069 --> 03:24:06.520
that includes the

03:24:06.520 --> 03:24:10.120
house and driveway so we're not going to be filling up a

03:24:10.120 --> 03:24:11.120
whole lot with with

03:24:11.120 --> 03:24:14.559
house and concrete so we'll be you know meeting that

03:24:14.559 --> 03:24:17.159
requirement again like Haley

03:24:17.159 --> 03:24:20.479
said you know duplex lots you know can't but the property

03:24:20.479 --> 03:24:22.360
lines we're gonna be

03:24:22.360 --> 03:24:27.780
separating either by an open space or an alley to provide

03:24:27.780 --> 03:24:30.159
that buffer and then

03:24:30.159 --> 03:24:32.620
you know more than four units right now we're looking at

03:24:32.620 --> 03:24:33.280
about three and a half

03:24:33.280 --> 03:24:38.959
units so we're not even maxing out you know what we can you

03:24:38.959 --> 03:24:40.239
know except parking

03:24:40.239 --> 03:24:43.889
you know required to have four spaces right now we're gonna

03:24:43.889 --> 03:24:44.680
have two car

03:24:44.680 --> 03:24:49.659
garages and provide two in a driveway and then propose var

03:24:49.659 --> 03:24:51.280
iances right now we

03:24:51.280 --> 03:24:56.940
have no variances that we're proposing in the pre meeting H

03:24:56.940 --> 03:24:57.959
aley mentioned that

03:24:57.959 --> 03:24:59.879
you know we had some side constraints and you know why

03:24:59.879 --> 03:25:00.920
weren't we developing

03:25:00.920 --> 03:25:04.370
the park area well one of the biggest reasons is there's an

03:25:04.370 --> 03:25:05.319
Explorer pipeline

03:25:05.319 --> 03:25:08.600
that goes through the site it's an eight-inch high-pressure

03:25:08.600 --> 03:25:09.399
line it's

03:25:09.399 --> 03:25:12.319
currently inactive so there's no product being moved

03:25:12.319 --> 03:25:13.799
through that right now but

03:25:13.799 --> 03:25:17.170
again in order to cross that property with road or any

03:25:17.170 --> 03:25:18.360
utility it's it's very

03:25:18.360 --> 03:25:23.090
difficult and so of course we can't build you know any

03:25:23.090 --> 03:25:23.959
houses or put lots

03:25:23.959 --> 03:25:27.889
across that so you know this kind of impediment to that

03:25:27.889 --> 03:25:29.319
another concern is

03:25:29.319 --> 03:25:34.750
along our West line there's a 54 foot electric easement

03:25:34.750 --> 03:25:36.079
that's been put in

03:25:36.079 --> 03:25:38.549
place there's overhead power lines along there as well so

03:25:38.549 --> 03:25:39.360
that's another

03:25:39.360 --> 03:25:44.790
constraint that you know we have to deal with and there's

03:25:44.790 --> 03:25:46.120
also underground

03:25:46.120 --> 03:25:48.590
drainage pipe coming from the subdivision to the south that

03:25:48.590 --> 03:25:49.239
cuts across our

03:25:49.239 --> 03:25:52.420
property and ties into the system in Audra and from there

03:25:52.420 --> 03:25:53.479
it goes north and

03:25:53.479 --> 03:25:57.159
up to an open channel so that's another constraint so as

03:25:57.159 --> 03:25:58.200
you can see on the East

03:25:58.200 --> 03:26:02.920
side there's quite a bit of constraints that are you know

03:26:02.920 --> 03:26:04.059
put impediments to

03:26:04.059 --> 03:26:09.020
developing you know residential lots and of course you know

03:26:09.020 --> 03:26:09.840
at the top we're

03:26:09.840 --> 03:26:13.020
gonna have to you know do our part to improve Audra that's

03:26:13.020 --> 03:26:14.319
not necessarily

03:26:14.319 --> 03:26:17.209
an impediment but it's still a cause that we have to you

03:26:17.209 --> 03:26:18.280
know bear with our

03:26:18.280 --> 03:26:22.399
project and you know this is something what Haley you know

03:26:22.399 --> 03:26:23.680
showed as well but

03:26:23.680 --> 03:26:26.860
you know here's our street extensions that we're planning

03:26:26.860 --> 03:26:28.879
on putting in our

03:26:28.879 --> 03:26:31.829
single-family detached houses that we're planning on

03:26:31.829 --> 03:26:34.280
putting in as well our duplex

03:26:34.280 --> 03:26:37.959
again it's we're buffered I guess the adjacent

03:26:37.959 --> 03:26:40.079
neighborhoods and again our

03:26:40.079 --> 03:26:44.469
rear entry alleys that we put in to keep the streets cars

03:26:44.469 --> 03:26:47.000
off the street and the

03:26:47.000 --> 03:26:50.930
rest of the property we're putting an open space again we

03:26:50.930 --> 03:26:52.040
hope that this you

03:26:52.040 --> 03:26:56.120
know Parks Department will we'll see this as a benefit and

03:26:56.120 --> 03:26:57.159
we'll be able to

03:26:57.159 --> 03:27:02.590
dedicate this to the city for for park development now

03:27:02.590 --> 03:27:04.319
these are some examples

03:27:04.319 --> 03:27:08.290
of other projects that are in Denton some of them are

03:27:08.290 --> 03:27:10.920
actually townhomes but

03:27:10.920 --> 03:27:14.100
you know this is the kind of feel that we're getting on the

03:27:14.100 --> 03:27:15.520
upper left this is

03:27:15.520 --> 03:27:19.989
up in Discovery Park you can see you know it's rear entry

03:27:19.989 --> 03:27:22.020
houses so the

03:27:22.020 --> 03:27:26.069
fronts are kept nice and clean this is actually a new build

03:27:26.069 --> 03:27:28.559
out there so that's

03:27:28.559 --> 03:27:32.100
why it's still the grass is still you know trying to grow

03:27:32.100 --> 03:27:33.680
in on the bottom and

03:27:33.680 --> 03:27:37.959
on the upper right corner those are along poinsettia Drive

03:27:37.959 --> 03:27:39.719
up up along at

03:27:39.719 --> 03:27:44.329
288 a little bit further north you know these lawns are

03:27:44.329 --> 03:27:46.840
very well maintained you

03:27:46.840 --> 03:27:49.760
know we are going to have an HOA and we're even kicking the

03:27:49.760 --> 03:27:50.440
idea of having

03:27:50.440 --> 03:27:55.870
HOA maintain the front yards so they can stay as consistent

03:27:55.870 --> 03:27:57.139
and a picture up

03:27:57.139 --> 03:28:01.739
right that's a picture of the alley back on behind the po

03:28:01.739 --> 03:28:03.799
insettia development again

03:28:03.799 --> 03:28:07.530
kept nice and clean they even have power lines similar to

03:28:07.530 --> 03:28:08.200
what we're going to

03:28:08.200 --> 03:28:14.709
have going back there so with that I'm happy to answer any

03:28:14.709 --> 03:28:15.360
questions that you

03:28:15.360 --> 03:28:20.799
have we do have one question to mr. Beck thank you chair

03:28:20.799 --> 03:28:22.040
thank you miss Sean

03:28:22.040 --> 03:28:27.459
yes sir yeah thank you for your presentation so it appears

03:28:27.459 --> 03:28:28.399
that all the

03:28:28.399 --> 03:28:32.209
duplexes will have rear entry parking correct and single-

03:28:32.209 --> 03:28:33.120
family homes will have

03:28:33.120 --> 03:28:35.680
front entry park most of the single-family actually will

03:28:35.680 --> 03:28:36.239
have rear end

03:28:36.239 --> 03:28:39.440
I think we have one or two the way that the allies of work

03:28:39.440 --> 03:28:40.319
okay that will be

03:28:40.319 --> 03:28:43.959
front entry okay but it's you know we prefer to have them

03:28:43.959 --> 03:28:45.600
all rear entry but

03:28:45.600 --> 03:28:49.579
there's you know one or two out lots that may be difficult

03:28:49.579 --> 03:28:50.479
to serve with an

03:28:50.479 --> 03:28:55.360
out sure sure and I understand and I appreciate the fact

03:28:55.360 --> 03:28:57.520
that I guess because

03:28:57.520 --> 03:28:59.989
you're pricing these houses as high as you are that

03:28:59.989 --> 03:29:01.120
hopefully they will be owner

03:29:01.120 --> 03:29:04.770
occupied but you know once these are developed and on down

03:29:04.770 --> 03:29:06.479
the road I mean

03:29:06.479 --> 03:29:09.750
what's to prevent that duplex owner from renting out there

03:29:09.750 --> 03:29:11.280
is yeah it's you know

03:29:11.280 --> 03:29:17.120
it's it's you know I'm in my neighborhood myself you know

03:29:17.120 --> 03:29:18.120
my

03:29:18.120 --> 03:29:20.629
neighborhood I think right now it's about 15% of rental

03:29:20.629 --> 03:29:21.840
properties it was an

03:29:21.840 --> 03:29:24.299
old starter you know house community I was developed in the

03:29:24.299 --> 03:29:26.120
late 90s and you

03:29:26.120 --> 03:29:30.209
know I'm a 16 year 16 year resident of Denton so I've seen

03:29:30.209 --> 03:29:31.399
a lot of development

03:29:31.399 --> 03:29:35.229
come in you know there's not much that we can do you know

03:29:35.229 --> 03:29:36.200
once someone buys the

03:29:36.200 --> 03:29:39.090
property for them to turn into a rental I understand that

03:29:39.090 --> 03:29:40.239
my concern and just my

03:29:40.239 --> 03:29:47.399
feeling it's not an absolute but it seems like duplexes

03:29:47.399 --> 03:29:49.479
tend to convert

03:29:49.479 --> 03:29:53.680
easily more easily oh yes our property I did have one

03:29:53.680 --> 03:29:55.479
discussion with a lady a

03:29:55.479 --> 03:30:00.459
couple weeks ago she called up and she was a more mature

03:30:00.459 --> 03:30:02.760
and she was looking at

03:30:02.760 --> 03:30:06.340
buying one the units and having a younger relative you know

03:30:06.340 --> 03:30:06.760
have the other

03:30:06.760 --> 03:30:10.079
half so that way you know she could still have her

03:30:10.079 --> 03:30:11.440
independence and and

03:30:11.440 --> 03:30:15.200
freedom but still be close to family that would be ideal

03:30:15.200 --> 03:30:15.840
yeah you know

03:30:15.840 --> 03:30:19.020
typically what what we're predicting will happen is gonna

03:30:19.020 --> 03:30:20.280
be empty nesters or

03:30:20.280 --> 03:30:26.989
you know families just starting off let me going on to the

03:30:26.989 --> 03:30:29.639
subject with the park

03:30:29.639 --> 03:30:34.450
hopefully the city will pick it up correct me if I'm wrong

03:30:34.450 --> 03:30:35.280
here if you're

03:30:35.280 --> 03:30:39.700
gonna have essentially 47 residences will you be able to

03:30:39.700 --> 03:30:41.799
have an HOA with fees

03:30:41.799 --> 03:30:45.129
that can afford to sustain a park if you if that's forced

03:30:45.129 --> 03:30:47.680
upon you well if if the

03:30:47.680 --> 03:30:52.139
Park Department does not pick it up you'll be something you

03:30:52.139 --> 03:30:53.280
know it with the

03:30:53.280 --> 03:30:56.760
fees that are out there they'd be able to do made no

03:30:56.760 --> 03:30:58.799
minimum maintenance probably

03:30:58.799 --> 03:31:01.430
won't be you know any trails or anything like that put in

03:31:01.430 --> 03:31:02.440
just a green space

03:31:02.440 --> 03:31:06.579
yeah so you'll be mostly edge like it's a green space you

03:31:06.579 --> 03:31:07.280
know if you go out

03:31:07.280 --> 03:31:09.459
there now you'll see you know four wheeler tracks going

03:31:09.459 --> 03:31:10.360
through there right

03:31:10.360 --> 03:31:15.180
now you know that's stuff that you won't want in the future

03:31:15.180 --> 03:31:16.159
and hopefully an HOA

03:31:16.159 --> 03:31:20.379
will be able to enforce you know the non recreational

03:31:20.379 --> 03:31:21.399
vehicles going back through

03:31:21.399 --> 03:31:25.120
there okay one last thing the concern about traffic barre

03:31:25.120 --> 03:31:25.799
ling through there

03:31:25.799 --> 03:31:31.790
once you open up oak valley any chance I mean you're not

03:31:31.790 --> 03:31:33.680
obligated to but any

03:31:33.680 --> 03:31:37.040
chance to minimize that by maybe putting a couple of speed

03:31:37.040 --> 03:31:38.280
bumps in there near

03:31:38.280 --> 03:31:42.450
Audreau and down the word connects yes sir the

03:31:42.450 --> 03:31:46.000
transportation code requires us

03:31:46.000 --> 03:31:50.219
to put in traffic calming devices okay and so that was the

03:31:50.219 --> 03:31:51.120
sense that we

03:31:51.120 --> 03:31:55.069
definitely will be putting in okay good deal good deal

03:31:55.069 --> 03:31:57.120
thank you sir thank you

03:31:57.120 --> 03:31:59.879
mr. Faulkner we have no other questions right now thank you

03:31:59.879 --> 03:32:00.440
we do have a couple

03:32:00.440 --> 03:32:03.200
cards so we'll go through these but it isn't a public

03:32:03.200 --> 03:32:04.440
hearing it is a public

03:32:04.440 --> 03:32:07.829
hearing so anyone who wishes to be can the first card I

03:32:07.829 --> 03:32:09.000
have here is John

03:32:09.000 --> 03:32:11.760
Maxwell

03:32:13.239 --> 03:32:17.770
so you just state your name and address okay John Maxwell I

03:32:17.770 --> 03:32:20.040
live at 2807 Howard

03:32:20.040 --> 03:32:29.100
Court I am just to the east of the subject property I don't

03:32:29.100 --> 03:32:29.520
think there's a

03:32:29.520 --> 03:32:36.610
pointer okay so I'm in this lot right here so I'm opposed

03:32:36.610 --> 03:32:38.120
to the proposed

03:32:38.120 --> 03:32:44.590
zoning based on the increased density I know the zoning has

03:32:44.590 --> 03:32:45.840
been recently

03:32:45.840 --> 03:32:52.260
changed to the properties to the West and I'd like to see a

03:32:52.260 --> 03:32:54.040
better buffer a

03:32:54.040 --> 03:33:00.530
better better transition between the high density and our

03:33:00.530 --> 03:33:03.959
properties I think

03:33:03.959 --> 03:33:09.389
the duplexes would not fit in with the existing

03:33:09.389 --> 03:33:13.840
neighborhoods again you know

03:33:13.840 --> 03:33:17.180
traffic I know that's going to be a big concern with the

03:33:17.180 --> 03:33:18.600
higher density homes

03:33:18.600 --> 03:33:22.659
that are going to be or apartments or whatever is going to

03:33:22.659 --> 03:33:23.760
be going in along

03:33:23.760 --> 03:33:33.059
Audra on to the west of this subject property see I have a

03:33:33.059 --> 03:33:34.520
question regarding

03:33:34.520 --> 03:33:40.129
the fences that would be put up on the east side of the du

03:33:40.129 --> 03:33:42.000
plexes are they going

03:33:42.000 --> 03:33:46.780
to be on the alley side or are they going to be right up

03:33:46.780 --> 03:33:48.559
against the homes

03:33:48.680 --> 03:33:51.860
yeah I'm concerned to speak to this but I want to make note

03:33:51.860 --> 03:33:52.760
you want to provide

03:33:52.760 --> 03:33:56.459
him an answer but the concept plan presented here has will

03:33:56.459 --> 03:33:57.600
not be tied to

03:33:57.600 --> 03:34:00.860
the approval of the rezoning okay so if if he has some

03:34:00.860 --> 03:34:02.000
thoughts and then wants

03:34:02.000 --> 03:34:04.559
to let you know about those we definitely want to provide

03:34:04.559 --> 03:34:04.840
that

03:34:04.840 --> 03:34:09.280
opportunity but it we're not holding him to this concept

03:34:09.280 --> 03:34:10.520
plan okay it could

03:34:10.520 --> 03:34:13.739
change he could not put duplexes there's a lot of things

03:34:13.739 --> 03:34:15.040
that could happen once

03:34:15.040 --> 03:34:17.750
we approve just the zoning aspect of it right he can

03:34:17.750 --> 03:34:19.280
certainly talk about the

03:34:19.280 --> 03:34:22.860
duplexes but I just want to ensure that we're not believing

03:34:22.860 --> 03:34:24.000
that the concept

03:34:24.000 --> 03:34:26.559
plan is gonna it's not what's being approved this evening

03:34:26.559 --> 03:34:27.559
right I understand

03:34:27.559 --> 03:34:31.079
that okay that's one of my concerns also is that you know I

03:34:31.079 --> 03:34:32.840
understand this is

03:34:32.840 --> 03:34:37.239
just a concept so he could come back and have more duplexes

03:34:37.239 --> 03:34:38.959
that are shown on on

03:34:38.959 --> 03:34:49.000
this concept plan potentially be tough yeah miss Fonder can

03:34:49.000 --> 03:34:49.719
you talk about the

03:34:49.719 --> 03:34:55.600
fencing you know typically with the duplex lot we won't

03:34:55.600 --> 03:34:56.200
really have any

03:34:56.200 --> 03:34:59.899
fencing along the backside of those houses there's just

03:34:59.899 --> 03:35:01.000
tends to be not a

03:35:01.000 --> 03:35:05.280
whole lot of space back there now in regards to you know

03:35:05.280 --> 03:35:08.040
more duplexes you

03:35:08.040 --> 03:35:11.239
know that's we're pretty much maxed out with this plan

03:35:11.239 --> 03:35:12.799
considering where the gas

03:35:12.799 --> 03:35:16.239
line is and stuff like that so we're not going to be

03:35:16.239 --> 03:35:19.319
putting more in this you

03:35:19.319 --> 03:35:21.790
know with a single you know we're still going with some

03:35:21.790 --> 03:35:23.000
single families in there

03:35:23.000 --> 03:35:26.750
you know to fill not only to fill the fire fulfill the city

03:35:26.750 --> 03:35:28.440
requirements but

03:35:28.440 --> 03:35:31.840
to provide little variety and not necessarily have all du

03:35:31.840 --> 03:35:32.920
plexes you know

03:35:32.920 --> 03:35:35.379
that's that's not what we're that's not what we're looking

03:35:35.379 --> 03:35:36.280
to do you know I

03:35:36.280 --> 03:35:38.870
guess you know repeat you know this developer is on this

03:35:38.870 --> 03:35:39.879
land for over 10

03:35:39.879 --> 03:35:43.479
years and now he built the houses along Barbara Street

03:35:43.479 --> 03:35:44.920
which is on the other

03:35:44.920 --> 03:35:47.790
side of this and you know as far as density we're looking

03:35:47.790 --> 03:35:48.600
about three and

03:35:48.600 --> 03:35:51.780
a half units to the acre you know other stuff you know and

03:35:51.780 --> 03:35:52.360
hey we could probably

03:35:52.360 --> 03:35:54.870
correct me if I'm wrong on this but the properties that

03:35:54.870 --> 03:35:56.000
recently got developed

03:35:56.000 --> 03:35:59.430
you know zone to the west of us there you know four to four

03:35:59.430 --> 03:36:00.479
and a half units

03:36:00.479 --> 03:36:04.409
to the acre and other developments there you know four to

03:36:04.409 --> 03:36:04.840
four and a half

03:36:04.840 --> 03:36:08.440
themselves so we're you know we're at three and a half

03:36:08.440 --> 03:36:11.440
maximum so we're you

03:36:11.440 --> 03:36:15.479
know we're not maxing out what we can do with it within our

03:36:15.479 --> 03:36:16.840
foreign district

03:36:17.360 --> 03:36:20.629
okay that's all the questions I have thank you thank you

03:36:20.629 --> 03:36:21.479
very much mr. Roswell

03:36:21.479 --> 03:36:26.840
the other card I have here is for Jay leak

03:36:28.879 --> 03:36:31.340
so you just state your name and address my name is Jay leak

03:36:31.340 --> 03:36:33.399
I live at 1216 Oak

03:36:33.399 --> 03:36:39.969
Valley which right around there so I was just gonna say

03:36:39.969 --> 03:36:41.799
simply I've lived in

03:36:41.799 --> 03:36:46.879
Denton for 23 years I own my home we've lived in the home

03:36:46.879 --> 03:36:49.879
for 21 years I don't

03:36:49.879 --> 03:36:53.059
own the field to the north of us I've enjoyed it I've

03:36:53.059 --> 03:36:54.479
enjoyed the blackberries

03:36:54.479 --> 03:36:58.719
I told mr. Johnson every spring there's frogs there because

03:36:58.719 --> 03:36:59.639
it's on a flood

03:36:59.639 --> 03:37:02.170
plain I knew when I moved in there we live we're moving

03:37:02.170 --> 03:37:03.280
into a hundred-year

03:37:03.280 --> 03:37:06.639
floodplain there's been issues with storm drainage I have a

03:37:06.639 --> 03:37:07.440
storm drain that

03:37:07.440 --> 03:37:13.659
runs along my property and then up this way that's not

03:37:13.659 --> 03:37:15.440
really a creek where the

03:37:15.440 --> 03:37:19.190
tree line is and I know we're talking we're not talking

03:37:19.190 --> 03:37:20.399
about drainage but if

03:37:20.399 --> 03:37:24.329
I had my choice I would say can you put put homes there

03:37:24.329 --> 03:37:26.360
versus duplexes I I

03:37:26.360 --> 03:37:29.329
travel around Dent a little bit and I know there's duplexes

03:37:29.329 --> 03:37:30.079
other places I

03:37:30.079 --> 03:37:33.690
would rather see homes it's going to devalue our property

03:37:33.690 --> 03:37:35.479
to the south they've

03:37:35.479 --> 03:37:38.659
recently it's not on this map but they've recently built

03:37:38.659 --> 03:37:39.760
successful homes

03:37:39.760 --> 03:37:42.940
to the south a whole new subdivision where there was a

03:37:42.940 --> 03:37:43.959
field when we moved

03:37:43.959 --> 03:37:48.549
there Bobcats have come and gone coyotes are leaving like I

03:37:48.549 --> 03:37:50.079
said I know it's it's

03:37:50.079 --> 03:37:52.159
only a matter of time before that's all developed the

03:37:52.159 --> 03:37:53.479
horses are gone but if I

03:37:53.479 --> 03:37:57.059
had my choice I would say leave it zoned like it originally

03:37:57.059 --> 03:37:58.559
was instead of

03:37:58.559 --> 03:38:02.610
switching it over and saying let's put one and a half times

03:38:02.610 --> 03:38:03.719
to two times as

03:38:03.719 --> 03:38:07.959
many and that's that's pretty much all I had so I

03:38:07.959 --> 03:38:08.920
appreciate I talked to mr.

03:38:08.920 --> 03:38:12.530
Johnson he talked about the park which is although that's

03:38:12.530 --> 03:38:13.639
nice that's a pig and

03:38:13.639 --> 03:38:16.350
a poke because number one I didn't sounds like you're not

03:38:16.350 --> 03:38:17.280
allowed to build

03:38:17.280 --> 03:38:20.229
homes on top of the gas line anyway so we can call it a

03:38:20.229 --> 03:38:21.520
park or we can call it

03:38:21.520 --> 03:38:25.600
a field the advantage for me is going to be there's not

03:38:25.600 --> 03:38:27.280
gonna be any meth heads

03:38:27.280 --> 03:38:31.559
camping to 200 yards or a hundred yards from my house which

03:38:31.559 --> 03:38:32.360
we've had problems

03:38:32.360 --> 03:38:35.940
with that some area named the motorcycle tracks and stuff

03:38:35.940 --> 03:38:37.600
like that but I you

03:38:37.600 --> 03:38:40.190
know I don't have any problems seeing developed but if I

03:38:40.190 --> 03:38:41.879
had a choice and I

03:38:41.879 --> 03:38:45.059
had say any say I would say please leave it zone for single

03:38:45.059 --> 03:38:47.520
residences so or and

03:38:47.520 --> 03:38:51.500
I don't know what all the codes are but I'm opposed to the

03:38:51.500 --> 03:38:52.799
new plan so yeah I

03:38:52.799 --> 03:38:55.639
appreciate you coming out and your family staying up late

03:38:55.639 --> 03:38:57.639
it's impactful I

03:38:57.639 --> 03:39:01.329
will say I'm hoping that this if this goes through the city

03:39:01.329 --> 03:39:02.399
takes it over so

03:39:02.399 --> 03:39:05.579
it's not a field it actually can be groomed and sidewalks

03:39:05.579 --> 03:39:06.319
and actually

03:39:06.319 --> 03:39:09.520
become a legit part about the development because we're not

03:39:09.520 --> 03:39:09.799
approving

03:39:09.799 --> 03:39:12.600
that tonight there's going to be other opportunities to

03:39:12.600 --> 03:39:13.879
speak into the plotting

03:39:13.879 --> 03:39:18.329
and the development process so we'd certainly hear it the

03:39:18.329 --> 03:39:18.920
developers

03:39:18.920 --> 03:39:21.639
obviously hearing your feedback but there is still

03:39:21.639 --> 03:39:23.040
iterations to come forward

03:39:23.040 --> 03:39:25.680
to see what's most economical for the developer it could be

03:39:25.680 --> 03:39:26.479
homes going

03:39:26.479 --> 03:39:30.760
forward so that that's not a dead end yet to see what what

03:39:30.760 --> 03:39:31.600
gets developed there

03:39:31.600 --> 03:39:35.010
so just I would say stay tuned in terms of the our agendas

03:39:35.010 --> 03:39:36.600
coming back and then

03:39:36.600 --> 03:39:41.360
come back and speak to those plans you're more than welcome

03:39:41.360 --> 03:39:42.000
to come down if

03:39:42.000 --> 03:39:44.360
able

03:39:54.520 --> 03:40:00.159
and I live at 2409 whispering Oaks and that street is

03:40:00.159 --> 03:40:01.920
parallel to what where

03:40:01.920 --> 03:40:06.180
you will be developing and right before the that your

03:40:06.180 --> 03:40:08.680
property is so how much

03:40:08.680 --> 03:40:13.600
distance will there be between my street my house and my

03:40:13.600 --> 03:40:14.959
fence and your

03:40:14.959 --> 03:40:19.680
development I've just wondered in what kind of division

03:40:19.680 --> 03:40:21.719
will there be a

03:40:21.719 --> 03:40:24.899
whether be a street there can Haley can you speak to that

03:40:24.899 --> 03:40:25.840
because we won't know

03:40:25.840 --> 03:40:28.530
what's being developed there but you can speak to any buff

03:40:28.530 --> 03:40:29.520
ering that would be

03:40:29.520 --> 03:40:32.329
required or if it just could be a house behind there can

03:40:32.329 --> 03:40:34.479
you speak to what

03:40:34.479 --> 03:40:40.069
potentially could border an NR for to an NR for

03:40:40.069 --> 03:40:43.120
neighborhood certainly so a

03:40:43.120 --> 03:40:46.590
whispering Oaks is here just south of the property so you

03:40:46.590 --> 03:40:47.840
would have this

03:40:47.840 --> 03:40:51.280
existing line of homes in between as well as there would be

03:40:51.280 --> 03:40:52.200
potentially a

03:40:52.200 --> 03:40:54.700
single-family home or an alley directly budding that

03:40:54.700 --> 03:40:55.659
property and there

03:40:55.659 --> 03:40:58.319
wouldn't be any landscape buffer requirements between

03:40:58.319 --> 03:40:59.040
single-family

03:40:59.040 --> 03:41:06.979
zoning so the park would be here on the east side of the

03:41:06.979 --> 03:41:09.479
property so the homes

03:41:09.479 --> 03:41:15.290
would be clustered in this area this is currently zoned for

03:41:15.290 --> 03:41:16.020
single-family and

03:41:16.020 --> 03:41:19.319
there's a flat under review by the city for single-family

03:41:19.319 --> 03:41:21.879
homes on that property

03:41:25.200 --> 03:41:31.670
Commissioner for netta and her concern based on what I'm

03:41:31.670 --> 03:41:32.239
looking at we're

03:41:32.239 --> 03:41:36.049
planning on zoning to match where her home actually is

03:41:36.049 --> 03:41:37.760
right now right going to

03:41:37.760 --> 03:41:40.219
enter for she's there only in it you're currently in an NR

03:41:40.219 --> 03:41:41.040
for so basically the

03:41:41.040 --> 03:41:44.219
the outline would potentially be you know pretty much

03:41:44.219 --> 03:41:45.559
matching what you already

03:41:45.559 --> 03:41:48.399
where you already living

03:41:53.040 --> 03:41:57.120
is there anyone else who wish to speak yes ma'am

03:42:00.680 --> 03:42:06.110
if you just state your name and address for the record my

03:42:06.110 --> 03:42:13.360
name is Nancy Carson I

03:42:13.360 --> 03:42:23.319
live at 2908 Oakshire I am within the 500 mile 500 feet

03:42:23.319 --> 03:42:24.639
neighborhood from

03:42:24.639 --> 03:42:32.149
this new development I'm very much against having duplexes

03:42:32.149 --> 03:42:33.280
in the area due

03:42:33.280 --> 03:42:37.479
to what we've seen with those that are already there

03:42:37.479 --> 03:42:40.559
although they are planning

03:42:40.559 --> 03:42:46.149
they say to put rear entry garages that's still not

03:42:46.149 --> 03:42:48.399
necessarily going to

03:42:48.399 --> 03:42:51.989
keep people from parking on the streets I mean I live on

03:42:51.989 --> 03:42:54.559
Oakshire cars are all up

03:42:54.559 --> 03:42:57.920
and down the street you don't stop that because you've got

03:42:57.920 --> 03:42:59.000
a garage or you've

03:42:59.000 --> 03:43:06.239
got a driveway also I would like to know what size these

03:43:06.239 --> 03:43:10.280
lots are going to be

03:43:10.280 --> 03:43:14.239
that the duplexes will be out

03:43:18.200 --> 03:43:22.840
right now yes we're still at the conceptual stage you know

03:43:22.840 --> 03:43:23.360
well you know

03:43:23.360 --> 03:43:27.559
for duplex so for one building well so the two lots

03:43:27.559 --> 03:43:29.479
combined we're looking you

03:43:29.479 --> 03:43:33.639
know between 60 to 70 feet wide typically some of them are

03:43:33.639 --> 03:43:34.159
will be

03:43:34.159 --> 03:43:41.149
wider some losses if you remember the concept plan you know

03:43:41.149 --> 03:43:42.719
on those on the

03:43:42.719 --> 03:43:46.809
south end they get extremely deep matter of fact you know

03:43:46.809 --> 03:43:47.360
we're even talking

03:43:47.360 --> 03:43:50.540
about having some detached garages from there just prevent

03:43:50.540 --> 03:43:51.520
you know the driveways

03:43:51.520 --> 03:43:54.879
from being so long and to provide those you know people

03:43:54.879 --> 03:43:56.159
with backyards that

03:43:56.159 --> 03:43:59.559
they'll be able to use well you must have figured something

03:43:59.559 --> 03:44:00.239
when you drew this

03:44:00.239 --> 03:44:09.100
out yeah they're typically I think I put them in about 120

03:44:09.100 --> 03:44:10.159
feet deep you know

03:44:10.159 --> 03:44:12.989
yeah you know we're all going to be able to you know cover

03:44:12.989 --> 03:44:14.719
60% of a lot so it's

03:44:14.719 --> 03:44:18.819
still gonna be a lot of green space you know on the lot you

03:44:18.819 --> 03:44:21.200
know from from what

03:44:21.200 --> 03:44:24.809
will be able to build out what do you mean you can only

03:44:24.809 --> 03:44:25.680
cover 60% of the lot

03:44:25.680 --> 03:44:30.510
are you talking the whole area on each lot each lot will

03:44:30.510 --> 03:44:32.040
only be able to cover

03:44:32.040 --> 03:44:36.180
60% of a lot with either building or driveway so if you

03:44:36.180 --> 03:44:37.079
combine those

03:44:37.079 --> 03:44:41.040
together so you know 40% a lot will still be you know

03:44:41.040 --> 03:44:43.760
landscape area so

03:44:43.760 --> 03:44:46.250
there's still be you know good bit of landscape area on

03:44:46.250 --> 03:44:47.879
each lot well also

03:44:47.879 --> 03:44:53.469
thank you for answering that I would like to say that

03:44:53.469 --> 03:44:55.639
builders are going to

03:44:55.639 --> 03:45:00.159
have absolutely no control over whether the owner is an

03:45:00.159 --> 03:45:02.600
occupant or not I live

03:45:02.600 --> 03:45:09.899
in a over 1800 square foot home and each side of the houses

03:45:09.899 --> 03:45:11.680
on each side of me

03:45:11.680 --> 03:45:18.629
are rented in fact five houses on my side of the street out

03:45:18.629 --> 03:45:20.239
of the five three

03:45:20.239 --> 03:45:26.590
are rentals and one of them on one side of the street an

03:45:26.590 --> 03:45:29.440
investor came in from

03:45:29.440 --> 03:45:35.250
San Francisco and he bought that house and I heard many

03:45:35.250 --> 03:45:37.440
others here in the city

03:45:37.440 --> 03:45:42.559
and he never sees how those people live or they let their

03:45:42.559 --> 03:45:44.200
grass grow up knee-deep

03:45:44.200 --> 03:45:49.620
or you know just all kinds of things very undesirable so

03:45:49.620 --> 03:45:51.479
you really have no

03:45:51.479 --> 03:45:57.069
control over that so I understand and and just as a point

03:45:57.069 --> 03:45:58.719
because the concept

03:45:58.719 --> 03:46:02.680
plan is not something we're being tied to in our four

03:46:02.680 --> 03:46:04.680
allows for a density of

03:46:04.680 --> 03:46:08.379
up to four units per acre so if we look more holistically

03:46:08.379 --> 03:46:10.000
about what potentially

03:46:10.000 --> 03:46:13.180
could be done after a rezone it'd be up to four units per

03:46:13.180 --> 03:46:14.520
acre across the entire

03:46:14.520 --> 03:46:23.379
plot does anyone else want to speak on this item yes and if

03:46:23.379 --> 03:46:27.319
you just state your

03:46:27.319 --> 03:46:34.030
name and address for the record Linda Bleece I live at 2805

03:46:34.030 --> 03:46:35.600
Howard Court

03:46:35.600 --> 03:46:43.989
Denton Texas I had no idea to speak but I am what we are

03:46:43.989 --> 03:46:47.200
trying to dis discern is

03:46:47.200 --> 03:46:54.920
to whether for to rezone it from a and and our two to a

03:46:54.920 --> 03:46:58.600
four yes ma'am I'm opposed to that I would not be opposed

03:46:58.600 --> 03:47:04.959
so much as to family single-family dwelling but I am

03:47:04.959 --> 03:47:13.920
concerned over them more in a smaller space and the I was

03:47:13.920 --> 03:47:19.030
told when we bought our house 14 15 years ago that we were

03:47:19.030 --> 03:47:21.120
in a floodplain and

03:47:21.120 --> 03:47:25.879
because of that pipeline or something that was behind us

03:47:25.879 --> 03:47:27.719
that they wouldn't be

03:47:27.719 --> 03:47:33.979
building there and now they're building or want to I our

03:47:33.979 --> 03:47:37.639
house is is very low

03:47:37.639 --> 03:47:44.209
and when it rains I have never we have never been flooded

03:47:44.209 --> 03:47:45.840
but it goes out our

03:47:45.840 --> 03:47:50.360
backyard and all the way down I'm sure where it goes I don

03:47:50.360 --> 03:47:51.319
't know because I

03:47:51.319 --> 03:47:55.909
don't go and look for it but anyway I I really hope that

03:47:55.909 --> 03:47:57.040
you take into

03:47:57.040 --> 03:48:01.770
consideration to leave it at - thank you appreciate that we

03:48:01.770 --> 03:48:02.959
have one question for

03:48:02.959 --> 03:48:08.329
you Mr. Beck thank you chair and miss please is it thank

03:48:08.329 --> 03:48:09.319
you for coming up and

03:48:09.319 --> 03:48:14.739
speaking you were opposed to changing this from an NR two

03:48:14.739 --> 03:48:15.840
to an NR four but

03:48:15.840 --> 03:48:23.350
are you aware that Howard Court is an NR four district it

03:48:23.350 --> 03:48:26.360
is so it's gonna be

03:48:26.360 --> 03:48:31.950
similar in size what's the difference and the term concern

03:48:31.950 --> 03:48:33.360
everybody has is

03:48:33.360 --> 03:48:43.319
the duplex thing but the sizes are gonna be the same but I

03:48:43.319 --> 03:48:45.959
think I would I would

03:48:45.959 --> 03:48:51.379
not be opposed to it coming in the back single-family and I

03:48:51.379 --> 03:48:52.840
understand it as to

03:48:52.840 --> 03:48:55.430
the drainage and I can't speak to this with any great

03:48:55.430 --> 03:48:56.399
authority but any

03:48:56.399 --> 03:49:00.110
development and development come in that comes in you know

03:49:00.110 --> 03:49:01.760
the city they have to

03:49:01.760 --> 03:49:04.459
make sure that they're not negatively impacting your

03:49:04.459 --> 03:49:05.920
property so actually

03:49:05.920 --> 03:49:08.870
drainage could conceivably improve when they get through

03:49:08.870 --> 03:49:10.159
with their development

03:49:10.159 --> 03:49:14.840
or if you were experiencing some minor flooding

03:49:16.840 --> 03:49:22.909
thank you thank you the system I see okay thank you we had

03:49:22.909 --> 03:49:27.000
one here first and

03:49:30.959 --> 03:49:36.549
serve you to state your name and address good evening my

03:49:36.549 --> 03:49:37.120
name is Charlie

03:49:37.120 --> 03:49:42.930
Rosendahl live at 1001 Barbara Street I'm opposed to the

03:49:42.930 --> 03:49:44.559
rezoning I understand

03:49:44.559 --> 03:49:50.149
that the concept plan is has been presented and today we're

03:49:50.149 --> 03:49:50.520
just talking

03:49:50.520 --> 03:49:54.250
about the zoning but once the zoning is changed they would

03:49:54.250 --> 03:49:55.440
be allowed to build

03:49:55.440 --> 03:49:58.620
duplexes in that property and there wouldn't be anything we

03:49:58.620 --> 03:49:59.200
could do at that

03:49:59.200 --> 03:50:05.299
point I will say here there was a question earlier at the

03:50:05.299 --> 03:50:05.799
work session

03:50:05.799 --> 03:50:10.920
about are there any duplexes in the area there's one street

03:50:10.920 --> 03:50:12.799
of duplexes here and

03:50:12.799 --> 03:50:17.239
then there's a row of duplexes here and in the entire map

03:50:17.239 --> 03:50:18.079
that's the only

03:50:18.079 --> 03:50:24.209
duplexes that I believe are in this this whole area as far

03:50:24.209 --> 03:50:25.479
as the rental

03:50:25.479 --> 03:50:29.850
properties that one row of duplexes here is a majority

03:50:29.850 --> 03:50:32.559
rental properties so I

03:50:32.559 --> 03:50:36.280
think it's conceivable to to assume that that would happen

03:50:36.280 --> 03:50:38.680
once this the duplexes

03:50:38.680 --> 03:50:45.250
are allowed to be built here also there is the NR6 zoning

03:50:45.250 --> 03:50:46.319
that we've talked

03:50:46.319 --> 03:50:50.530
about that was approved to the West here I believe council

03:50:50.530 --> 03:50:52.079
set the precedent in

03:50:52.079 --> 03:50:54.899
December when they approved that in our six zoning by

03:50:54.899 --> 03:50:56.100
allowing only single

03:50:56.100 --> 03:51:00.110
families in there and I think that this this body should

03:51:00.110 --> 03:51:01.760
abide by that precedent

03:51:01.760 --> 03:51:05.239
said not even a year ago that if you do allow the increase

03:51:05.239 --> 03:51:06.280
in densities it

03:51:06.280 --> 03:51:11.399
should be under the condition that it only be single-family

03:51:11.399 --> 03:51:15.120
homes I appreciate

03:51:15.120 --> 03:51:17.319
that

03:51:20.440 --> 03:51:27.010
yes mr. Walker one thing I would like to point out doesn't

03:51:27.010 --> 03:51:27.959
quite reach up here

03:51:27.959 --> 03:51:31.250
but I just want to point out you know that you know there's

03:51:31.250 --> 03:51:32.319
other areas in the

03:51:32.319 --> 03:51:36.959
city like up here it's in our mixed use 12 this is you know

03:51:36.959 --> 03:51:38.040
currently apartments

03:51:38.040 --> 03:51:43.420
this is undeveloped is also in our you me you 12 these are

03:51:43.420 --> 03:51:44.319
you know properties

03:51:44.319 --> 03:51:48.250
in the area that currently could be developed as multif

03:51:48.250 --> 03:51:49.840
amily without any

03:51:49.840 --> 03:51:53.600
zoning change I appreciate that because you're all said you

03:51:53.600 --> 03:51:54.159
want to speak and

03:51:54.159 --> 03:51:57.129
then I was gonna recognize thank you chair mr. Faulkner my

03:51:57.129 --> 03:51:57.760
questions for you

03:51:57.760 --> 03:52:00.940
actually just wondering if you looked in the feasibility of

03:52:00.940 --> 03:52:02.040
developing this with

03:52:02.040 --> 03:52:05.840
all single-family homes or garden style homes even yes we

03:52:05.840 --> 03:52:08.159
have and you know the

03:52:08.159 --> 03:52:12.969
amount of loss that we were able to get does not meet our

03:52:12.969 --> 03:52:15.360
financial needs I hate

03:52:15.360 --> 03:52:21.319
to be talk about money but that's what it's all about the

03:52:21.319 --> 03:52:21.840
amount of loss that

03:52:21.840 --> 03:52:25.040
we will have does not make the project economically

03:52:25.040 --> 03:52:27.360
feasible

03:52:33.000 --> 03:52:37.260
sir if you just state your name and you need to fill out a

03:52:37.260 --> 03:52:40.440
new card for this

03:52:40.440 --> 03:52:45.879
agenda item again it's Bob highly and I live at 3855 Le

03:52:45.879 --> 03:52:47.920
isure Lane I live on the

03:52:47.920 --> 03:52:50.909
other side of town but I have a dear friend that lives on

03:52:50.909 --> 03:52:52.000
barber Street who

03:52:52.000 --> 03:52:55.930
can't get out and she asked me since I was coming to look

03:52:55.930 --> 03:52:57.479
out for it but Michael

03:52:57.479 --> 03:53:02.299
my question is if the city takes over a big chunk of that

03:53:02.299 --> 03:53:06.120
property as City Park

03:53:06.120 --> 03:53:09.799
that you were mentioning on the east side which is directly

03:53:09.799 --> 03:53:10.920
behind our house

03:53:10.920 --> 03:53:17.079
which would be great but how does that figure into the are

03:53:17.079 --> 03:53:20.200
the are for is the

03:53:20.200 --> 03:53:24.860
track then reduced by the park line from separated from the

03:53:24.860 --> 03:53:26.360
parkland which would

03:53:26.360 --> 03:53:31.950
then mean that the actual density would would be less one

03:53:31.950 --> 03:53:33.920
the remaining property

03:53:33.920 --> 03:53:36.809
I'll ask Haley for clarification but I assume they can use

03:53:36.809 --> 03:53:37.719
that as a density

03:53:37.719 --> 03:53:44.780
credit certainly since it would all be platted together the

03:53:44.780 --> 03:53:46.079
entire 13 and a

03:53:46.079 --> 03:53:49.260
half acres would count for their density but it would be

03:53:49.260 --> 03:53:50.520
subdivided in the park

03:53:50.520 --> 03:53:53.889
would be dedicated as a separate lot to the city after that

03:53:53.889 --> 03:53:55.079
point but they they

03:53:55.079 --> 03:53:59.010
could get credit for that density does that answer your

03:53:59.010 --> 03:54:03.959
question yes well it's

03:54:03.959 --> 03:54:06.489
not being proposed but it could happen is actually greater

03:54:06.489 --> 03:54:07.479
than four per acre

03:54:07.479 --> 03:54:12.120
that's Chris yeah it would it would be any ways when you

03:54:12.120 --> 03:54:12.600
take in road

03:54:12.600 --> 03:54:15.959
consideration so any property it varies once you take road

03:54:15.959 --> 03:54:17.719
any tree mitigation

03:54:17.719 --> 03:54:21.690
any of that that provides density credit so it's not

03:54:21.690 --> 03:54:23.559
typically once the project's

03:54:23.559 --> 03:54:26.780
done it's not four acre four houses per that individual

03:54:26.780 --> 03:54:27.879
acre it's across the

03:54:27.879 --> 03:54:31.239
entire plot okay I just

03:54:37.959 --> 03:54:45.469
anyone else like to speak on this item I appreciate you all

03:54:45.469 --> 03:54:46.600
coming out and

03:54:46.600 --> 03:54:54.110
staying up late with us oh yes ma'am thank you miss that

03:54:54.110 --> 03:54:54.280
one

03:54:54.280 --> 03:54:57.459
there you just state your name and address please Lynette

03:54:57.459 --> 03:54:58.520
leak and I live

03:54:58.520 --> 03:55:03.239
at 1216 Oak Valley and I just wanted to say I was I'm

03:55:03.239 --> 03:55:04.680
opposed to that change

03:55:04.680 --> 03:55:10.909
zoning to NR4 but what is NR6 what did what does that

03:55:10.909 --> 03:55:11.799
address to what's the

03:55:11.799 --> 03:55:15.590
inner six so the inner six on this is the orange directly

03:55:15.590 --> 03:55:16.799
to the west of the

03:55:16.799 --> 03:55:21.639
subject property and it was approved last year as a rezone

03:55:21.639 --> 03:55:22.360
and there's a

03:55:22.360 --> 03:55:25.780
plot on file if you if you wanted to see how those houses

03:55:25.780 --> 03:55:26.879
will be constructed

03:55:26.879 --> 03:55:29.639
there already in the platting stage so you can see it's

03:55:29.639 --> 03:55:30.920
publicly available to

03:55:30.920 --> 03:55:33.780
know the roads and housing that's going on in that orange

03:55:33.780 --> 03:55:34.719
block it's being

03:55:34.719 --> 03:55:38.760
constructed now yeah just I mean similar concerns I mean

03:55:38.760 --> 03:55:40.920
just the same thing just

03:55:40.920 --> 03:55:45.760
that there would be the multifamily homes and just the

03:55:45.760 --> 03:55:47.399
density that it would

03:55:47.399 --> 03:55:50.719
be an issue or just be a problem and changing the

03:55:50.719 --> 03:55:52.840
neighborhood so that's it

03:55:52.840 --> 03:55:56.239
thank you for your feedback

03:56:01.879 --> 03:56:03.120
ma'am if you could if you could come down for I'm sure

03:56:03.120 --> 03:56:06.079
there's thousands of

03:56:06.079 --> 03:56:13.069
people watching this on TV right now my wife is apparently

03:56:13.069 --> 03:56:19.879
so there's one no I

03:56:19.879 --> 03:56:28.739
just want to ask about the NR6 does that mean what does

03:56:28.739 --> 03:56:31.360
that mean I mean

03:56:31.360 --> 03:56:34.540
fundamentally it's just a higher density area than in our

03:56:34.540 --> 03:56:35.440
six they can they can

03:56:35.440 --> 03:56:38.889
go up to six units per acre that specific property we ca

03:56:38.889 --> 03:56:39.719
pped them so

03:56:39.719 --> 03:56:42.899
they're not going to be above I believe it's five per acre

03:56:42.899 --> 03:56:43.639
they had a provision

03:56:43.639 --> 03:56:47.850
on it but there are uses identified in each zoning category

03:56:47.850 --> 03:56:48.600
of what can be

03:56:48.600 --> 03:56:53.219
placed in each zone and so it's it's actually a pretty long

03:56:53.219 --> 03:56:54.360
list but it's

03:56:54.360 --> 03:56:58.159
just a higher density residential zone in classification

03:56:58.159 --> 03:56:59.000
yeah that's really

03:56:59.000 --> 03:57:11.469
high okay thank you if I may add just a little bit of the

03:57:11.469 --> 03:57:12.040
explanation between

03:57:12.040 --> 03:57:16.399
NR6 and our four NR6 permits duplex by right regardless of

03:57:16.399 --> 03:57:17.399
where they are NR4

03:57:17.399 --> 03:57:21.079
restricts it to essentially interior lots so they can't a

03:57:21.079 --> 03:57:22.319
duplex could not

03:57:22.319 --> 03:57:26.319
a but a single-family lot property line to property line

03:57:26.319 --> 03:57:28.360
within NR4 and so this

03:57:28.360 --> 03:57:32.329
this this site is sort of unique given that that that

03:57:32.329 --> 03:57:34.079
pipeline and open space

03:57:34.079 --> 03:57:36.879
and so they're as a result they're able to to sort of

03:57:36.879 --> 03:57:38.280
arrange it in a way that

03:57:38.280 --> 03:57:41.860
internalizes the duplexes so that's how it's permitted in

03:57:41.860 --> 03:57:42.760
NR4 which is really

03:57:42.760 --> 03:57:46.340
the the distinction from from NR6 with those overlays if

03:57:46.340 --> 03:57:48.159
that helps thank you

03:57:48.159 --> 03:57:54.469
Richard mr. Beck thank you chair Haley did what was the

03:57:54.469 --> 03:57:55.799
opposition percentage

03:57:55.799 --> 03:58:00.909
here I just going forward if if if we do approve this does

03:58:00.909 --> 03:58:02.120
it meet the criteria

03:58:02.120 --> 03:58:06.639
for the super majority at City Council because this is not

03:58:06.639 --> 03:58:07.200
the final stop by

03:58:07.200 --> 03:58:15.200
the way folks we'd have to recalculate with that prior to

03:58:15.200 --> 03:58:15.879
the meeting I had our

03:58:15.879 --> 03:58:18.649
GIS team right and we were only at about 3% with with the

03:58:18.649 --> 03:58:19.680
ones reflected here on

03:58:19.680 --> 03:58:23.909
the map certainly these responses would also go into that

03:58:23.909 --> 03:58:25.219
but I'm not sure if it

03:58:25.219 --> 03:58:28.600
would hit that 20% because there there are these large

03:58:28.600 --> 03:58:30.040
tracks to the the west

03:58:30.040 --> 03:58:36.030
of the site that would make up a sizable amount okay thank

03:58:36.030 --> 03:58:36.079
you

03:58:36.840 --> 03:58:43.299
anyone else like to speak on this item seeing none I'll

03:58:43.299 --> 03:58:45.559
close the public hearing

03:58:45.559 --> 03:58:49.360
and open for discussion or motion

03:58:53.479 --> 03:58:57.819
Christian Beck thank you chair and thank all of you for

03:58:57.819 --> 03:58:58.479
coming down and staying

03:58:58.479 --> 03:59:01.420
as long as you have I know it's it's been a long night for

03:59:01.420 --> 03:59:02.520
you and I realize

03:59:02.520 --> 03:59:07.629
this is a frustrating development for you I empathize with

03:59:07.629 --> 03:59:08.719
you really I've

03:59:08.719 --> 03:59:12.920
stated my concerns I think duplexes turn to tend to turn

03:59:12.920 --> 03:59:14.040
over quicker as rental

03:59:14.040 --> 03:59:17.299
property but as rental property goes every neighborhood is

03:59:17.299 --> 03:59:18.399
going to have some

03:59:18.399 --> 03:59:24.000
I believe mr. Faulkner stated that at least the initial

03:59:24.000 --> 03:59:26.159
buyer had to be had to

03:59:26.159 --> 03:59:29.399
reside in the home what happens after somebody sells a

03:59:29.399 --> 03:59:30.639
house nobody has any

03:59:30.639 --> 03:59:37.200
control over that either so but what we're looking at here

03:59:37.200 --> 03:59:37.719
is a piece of

03:59:37.719 --> 03:59:41.510
property that's been here for a while mr. Faulkner feels

03:59:41.510 --> 03:59:42.719
that if it was all

03:59:42.719 --> 03:59:46.979
single-family that he wouldn't get the bang for his buck

03:59:46.979 --> 03:59:48.520
and I understand that

03:59:48.520 --> 03:59:53.120
you know money is an issue here that bothers some people

03:59:53.120 --> 03:59:54.360
bothers me some of

03:59:54.360 --> 04:00:00.489
the times but eventually this property will sit there for a

04:00:00.489 --> 04:00:01.120
long period of time

04:00:01.120 --> 04:00:05.069
we won't gain any tax revenue from it if we don't do

04:00:05.069 --> 04:00:07.559
something and this is this

04:00:07.559 --> 04:00:11.530
isn't a real is reasonable in the sense that it's he's

04:00:11.530 --> 04:00:13.399
willing to work with you

04:00:13.399 --> 04:00:16.350
on the traffic issue putting speed bumps in hopefully it'll

04:00:16.350 --> 04:00:17.680
occur the buffers

04:00:17.680 --> 04:00:22.260
seem adequate more than adequate and if you get a green

04:00:22.260 --> 04:00:23.379
zone there maybe even a

04:00:23.379 --> 04:00:26.559
city park you've got a little extra benefit that you didn't

04:00:26.559 --> 04:00:30.000
have so there is

04:00:30.000 --> 04:00:34.159
some reluctance on my part to to approve this but it does

04:00:34.159 --> 04:00:36.000
meet the criteria that

04:00:36.000 --> 04:00:40.639
the city establishes so that being said even reluctantly I

04:00:40.639 --> 04:00:41.879
'm gonna make a motion

04:00:41.879 --> 04:00:49.879
to approve the 1815 with any conditions we had no okay

04:00:49.879 --> 04:00:51.319
thank you

04:00:51.319 --> 04:00:58.290
Commissioner Beck we have a motion Chris your Sanchez is

04:00:58.290 --> 04:01:00.639
that look look around

04:01:00.639 --> 04:01:04.399
in the neighborhood you know you have an R6 and quite a bit

04:01:04.399 --> 04:01:05.920
of NR for there you

04:01:05.920 --> 04:01:11.799
have a few areas that are NR to and I'm you know if you

04:01:11.799 --> 04:01:13.559
want to stay with with I

04:01:13.559 --> 04:01:18.329
don't think in our floor is contradictory what he's asking

04:01:18.329 --> 04:01:18.920
for for

04:01:18.920 --> 04:01:24.729
what it's in the area and that you know I guess we look at

04:01:24.729 --> 04:01:26.120
duplexes but that's

04:01:26.120 --> 04:01:29.600
not what we're here talking about we're here to talk about

04:01:29.600 --> 04:01:32.200
the zoning you know

04:01:32.200 --> 04:01:36.840
is there a good possibility of there being

04:01:36.840 --> 04:01:41.040
duplexes there there probably is that's probably the most

04:01:41.040 --> 04:01:42.040
feasible like you

04:01:42.040 --> 04:01:47.629
mentioned this what can you build there and still make a

04:01:47.629 --> 04:01:48.239
little bit of money

04:01:48.239 --> 04:01:50.629
that's somewhat it's a that's what it's all about people

04:01:50.629 --> 04:01:51.159
have to make a little

04:01:51.159 --> 04:01:54.549
bit a little bit of money they just can't leave that

04:01:54.549 --> 04:01:57.479
property vacant so you

04:01:57.479 --> 04:02:04.110
know I think looking at the area the whole area I'm gonna

04:02:04.110 --> 04:02:06.120
vote for it and

04:02:06.120 --> 04:02:08.219
Christians like chances are you are you second in the

04:02:08.219 --> 04:02:11.639
motion yes okay any other

04:02:11.639 --> 04:02:17.879
discussion yes Commissioner Ellis thank you chair I just a

04:02:17.879 --> 04:02:18.959
couple thoughts thank

04:02:18.959 --> 04:02:21.819
you all for coming out to share yours I struggle with this

04:02:21.819 --> 04:02:23.200
a little bit for for

04:02:23.200 --> 04:02:26.780
similar reasons that you mentioned when I saw a duplexes is

04:02:26.780 --> 04:02:27.680
going in here

04:02:27.680 --> 04:02:33.270
however with the limitations I think for what can be built

04:02:33.270 --> 04:02:35.159
on the lot with

04:02:35.159 --> 04:02:40.270
hopefully the the forward progress made with the city for

04:02:40.270 --> 04:02:42.239
the park as well as

04:02:42.239 --> 04:02:45.590
the limitations that the development code puts on where the

04:02:45.590 --> 04:02:46.520
duplexes can be

04:02:46.520 --> 04:02:51.739
on the lot I think this can be a very nice development

04:02:51.739 --> 04:02:53.879
going forward if if

04:02:53.879 --> 04:02:56.500
this concept plan actually makes it in their two hundred

04:02:56.500 --> 04:02:57.600
fifty thousand dollars

04:02:57.600 --> 04:03:03.219
a side that will speak to more owner occupants than it does

04:03:03.219 --> 04:03:04.000
to rentals

04:03:04.000 --> 04:03:07.180
because the money factor is not going to make any sense for

04:03:07.180 --> 04:03:08.280
the landlord if they

04:03:08.280 --> 04:03:11.170
spend that kind of money they're not going to make any

04:03:11.170 --> 04:03:13.719
money on a rent so

04:03:13.719 --> 04:03:17.639
those are my thoughts and I will support the motion

04:03:17.639 --> 04:03:21.610
Christian back thank you chair and this is for the people

04:03:21.610 --> 04:03:23.040
who live in the area

04:03:23.040 --> 04:03:26.620
mr. Faulkner don't take it personal but this isn't the last

04:03:26.620 --> 04:03:27.559
step this has to go

04:03:27.559 --> 04:03:31.200
to City Council it has to be approved I mentioned the 20%

04:03:31.200 --> 04:03:34.200
ratio that if you know

04:03:34.200 --> 04:03:37.030
there's strong enough opposition in the surrounding areas

04:03:37.030 --> 04:03:38.920
within the 200 feet if

04:03:38.920 --> 04:03:42.100
you can get them at City Council and amounts to 20% of the

04:03:42.100 --> 04:03:43.440
population they can

04:03:43.440 --> 04:03:48.239
only approve by a super majority vote which would be a six

04:03:48.239 --> 04:03:50.280
to one if so it

04:03:50.280 --> 04:03:57.979
means that it works in your favor if you get six to one no

04:03:57.979 --> 04:04:00.680
no we're talking about

04:04:00.680 --> 04:04:06.569
the area within 200 feet of the area you have to have I'm

04:04:06.569 --> 04:04:08.639
not sure it's 20%

04:04:08.639 --> 04:04:18.399
Haley can you help with that you need a few more yes yeah

04:04:18.399 --> 04:04:19.719
the the 20% is

04:04:19.719 --> 04:04:23.090
calculated based on the land area within this 200 foot

04:04:23.090 --> 04:04:24.319
buffer so within the red

04:04:24.319 --> 04:04:28.690
circle so it would be a large number of properties that

04:04:28.690 --> 04:04:29.719
would have to voice

04:04:29.719 --> 04:04:33.649
opposition either by submitting that in writing to us or

04:04:33.649 --> 04:04:34.319
attending one of the

04:04:34.319 --> 04:04:39.909
meetings to trigger that but even still yeah there's coming

04:04:39.909 --> 04:04:40.360
before the City

04:04:40.360 --> 04:04:45.500
Council again it would be the final now or approval of it

04:04:45.500 --> 04:04:46.879
denial of it so there

04:04:46.879 --> 04:04:55.319
is still one more opportunity so I wanted to before I call

04:04:55.319 --> 04:04:57.000
us to a vote is

04:04:57.000 --> 04:05:01.680
is again thank you all for staying late I wanted to echo

04:05:01.680 --> 04:05:04.860
Commissioner Becks points and what I said earlier there is

04:05:04.860 --> 04:05:05.680
more to this process

04:05:05.680 --> 04:05:10.489
and so stay active and even if the zoning goes through

04:05:10.489 --> 04:05:11.840
council has to

04:05:11.840 --> 04:05:15.020
approve it and then once that's approved then there has to

04:05:15.020 --> 04:05:16.159
be a platting stage

04:05:16.159 --> 04:05:19.950
that that people can articulate into it in terms of my

04:05:19.950 --> 04:05:22.280
opinion on the rezoning I

04:05:22.280 --> 04:05:26.809
think as it stands as an inner to that land is and has not

04:05:26.809 --> 04:05:28.000
been able to be

04:05:28.000 --> 04:05:33.219
developed and I'm for the infill development of this land

04:05:33.219 --> 04:05:34.680
and so I'm in

04:05:34.680 --> 04:05:37.319
support of it in our four because I think it does provide

04:05:37.319 --> 04:05:38.200
the residents in

04:05:38.200 --> 04:05:40.659
that inner four neighborhood a little bit of buffer going

04:05:40.659 --> 04:05:42.200
to that in our six to

04:05:42.200 --> 04:05:46.200
the west I would stay based on the feedback I heard I would

04:05:46.200 --> 04:05:47.120
encourage the

04:05:47.120 --> 04:05:51.049
applicant to see what economic feasibilities you have with

04:05:51.049 --> 04:05:51.600
the density

04:05:51.600 --> 04:05:54.780
credit from the east side property you could you could do

04:05:54.780 --> 04:05:55.920
to give single-family

04:05:55.920 --> 04:05:59.940
homes and hear the feedback of the residents to see if that

04:05:59.940 --> 04:06:00.840
if there is a

04:06:00.840 --> 04:06:03.709
breakeven point that makes sense there but I can appreciate

04:06:03.709 --> 04:06:04.440
the economic

04:06:04.440 --> 04:06:07.809
feasibility of the property in a whole with that said

04:06:07.809 --> 04:06:09.479
though I'd be interested

04:06:09.479 --> 04:06:11.639
to see if there's there's other projects that are feasible

04:06:11.639 --> 04:06:13.079
on that property that

04:06:13.079 --> 04:06:17.809
would fit more in line with what the residents have has a

04:06:17.809 --> 04:06:18.280
how articulated

04:06:18.280 --> 04:06:21.459
tonight but with that I don't see any other discussion so I

04:06:21.459 --> 04:06:22.120
will call for this

04:06:22.120 --> 04:06:39.799
vote on the board motion carries six zero with one absent

04:06:39.799 --> 04:06:42.239
next on the agenda

04:06:42.239 --> 04:06:46.770
is our planning zoning Commission project matrix and I will

04:06:46.770 --> 04:06:47.479
start off

04:06:47.479 --> 04:06:52.340
asking Richard if there's any updates wanted to provide

04:06:52.340 --> 04:06:54.000
just a quick update on

04:06:54.000 --> 04:06:57.180
on the tree code I know we originally talked about bringing

04:06:57.180 --> 04:06:59.799
it back earlier

04:06:59.799 --> 04:07:04.639
for this evening we're still working on those on those

04:07:04.639 --> 04:07:06.239
changes we're going back

04:07:06.239 --> 04:07:09.659
to the Committee on the Environment what had happened as a

04:07:09.659 --> 04:07:10.920
result of the holiday

04:07:10.920 --> 04:07:15.120
that meeting got got moved so we're going back this coming

04:07:15.120 --> 04:07:16.340
Monday and so we

04:07:16.340 --> 04:07:19.520
have made made some revisions some updates based upon the

04:07:19.520 --> 04:07:20.319
input but again

04:07:20.319 --> 04:07:25.540
we still are in the in the drafting stage and we're

04:07:25.540 --> 04:07:26.899
certainly open to open

04:07:26.899 --> 04:07:30.690
to discussion but we are we're moving as swiftly as we can

04:07:30.690 --> 04:07:32.319
on it I think part of

04:07:32.319 --> 04:07:34.790
it when we do come back we didn't get really a chance to

04:07:34.790 --> 04:07:35.479
talk about the

04:07:35.479 --> 04:07:39.059
landscape code and so as we look at canopy and talk about

04:07:39.059 --> 04:07:40.159
canopy there's

04:07:40.159 --> 04:07:42.620
there's multiple components to it that I want to make sure

04:07:42.620 --> 04:07:43.239
that we it doesn't

04:07:43.239 --> 04:07:47.379
just get lost in in with the preservation component

04:07:47.379 --> 04:07:52.239
Christopher Beck thank you chair question I guess first for

04:07:52.239 --> 04:07:53.120
I make a

04:07:53.120 --> 04:07:57.870
second what is the requirement for the orange fencing on

04:07:57.870 --> 04:07:59.079
trees is it supposed

04:07:59.079 --> 04:08:02.870
to be at the drip line tree drip line because if it's not I

04:08:02.870 --> 04:08:04.360
want I've got a

04:08:04.360 --> 04:08:06.440
pull I've got to pull it up but I'll give that I want to

04:08:06.440 --> 04:08:07.280
talk to Haywood but

04:08:07.280 --> 04:08:09.959
I will give that answer okay I'll send it to everybody

04:08:09.959 --> 04:08:11.840
tomorrow if it's not

04:08:11.840 --> 04:08:16.079
my suggestion would be that we push for that because that

04:08:16.079 --> 04:08:18.079
makes sense the loss

04:08:18.079 --> 04:08:21.260
of trees is needless if we get in some right and if it is

04:08:21.260 --> 04:08:22.399
identified on that

04:08:22.399 --> 04:08:26.520
approved tree preservation plan if it is lost they are

04:08:26.520 --> 04:08:28.020
required to right they

04:08:28.020 --> 04:08:33.409
are required to replace it I curse your Alice thank you

04:08:33.409 --> 04:08:34.840
chair bear with me I

04:08:34.840 --> 04:08:39.840
just have a couple here so recently I read an editorial I

04:08:39.840 --> 04:08:41.520
guess it was over

04:08:41.520 --> 04:08:45.059
the weekend about a small business owner who was impacted

04:08:45.059 --> 04:08:46.280
by some construction

04:08:46.280 --> 04:08:48.979
that was happening in front of her business and she got no

04:08:48.979 --> 04:08:49.920
notification of

04:08:49.920 --> 04:08:54.350
that I don't have specifics again it was just an editorial

04:08:54.350 --> 04:08:54.920
she didn't say

04:08:54.920 --> 04:08:58.590
exactly where this was but she mentioned the city and a

04:08:58.590 --> 04:09:00.600
certain developer who

04:09:00.600 --> 04:09:03.690
tore up the sidewalk in front of her business took up most

04:09:03.690 --> 04:09:04.680
of her parking and

04:09:04.680 --> 04:09:08.139
she did not know anything about it so can you get us info

04:09:08.139 --> 04:09:09.239
on what that process

04:09:09.239 --> 04:09:13.290
is for notifying I would hope that we have one and if a

04:09:13.290 --> 04:09:14.719
small business owner

04:09:14.719 --> 04:09:17.500
like that is gonna be impacted they certainly need to be

04:09:17.500 --> 04:09:18.159
able to make

04:09:18.159 --> 04:09:20.690
accommodations for their customers in there or even

04:09:20.690 --> 04:09:22.200
somebody to call right

04:09:22.200 --> 04:09:28.219
right another one is can we address the concerns about the

04:09:28.219 --> 04:09:29.760
notifications today I

04:09:29.760 --> 04:09:34.200
I don't understand why everybody in Regency wouldn't have

04:09:34.200 --> 04:09:35.159
received that

04:09:35.159 --> 04:09:38.770
doesn't make any sense to me but I also I saw a response I

04:09:38.770 --> 04:09:39.879
think it was on one

04:09:39.879 --> 04:09:43.260
of the creek side notifications that they didn't live there

04:09:43.260 --> 04:09:44.280
anymore and they

04:09:44.280 --> 04:09:49.610
hadn't for a year and we sent them a notice so I'm confused

04:09:49.610 --> 04:09:50.639
on that as well

04:09:50.639 --> 04:09:53.590
because we shouldn't have your own I mean they sold their

04:09:53.590 --> 04:09:54.559
property she said

04:09:54.559 --> 04:09:59.620
July of 17 this is August of 18 or September of 18 excuse

04:09:59.620 --> 04:10:01.020
me I'm thinking we

04:10:01.020 --> 04:10:04.750
should have more updated roles than that yeah because we're

04:10:04.750 --> 04:10:05.680
pulling right from

04:10:05.680 --> 04:10:09.200
the from from the crazy and I don't know if there's an easy

04:10:09.200 --> 04:10:12.000
answer to that but

04:10:12.000 --> 04:10:15.719
we've come across the past the county sends over their

04:10:15.719 --> 04:10:16.600
certified tax roll

04:10:16.600 --> 04:10:20.739
once a year in the past it's taken our GIS team a while to

04:10:20.739 --> 04:10:21.479
get our entire

04:10:21.479 --> 04:10:24.659
database updated with that new information so there

04:10:24.659 --> 04:10:25.559
typically is at

04:10:25.559 --> 04:10:30.360
least a year lag time in our addressing which which is an

04:10:30.360 --> 04:10:32.159
issue but it's my

04:10:32.159 --> 04:10:34.780
understanding and maybe Jerry could help with that that we

04:10:34.780 --> 04:10:35.719
are required to use

04:10:35.719 --> 04:10:39.250
the certified tax roll I believe that is a local government

04:10:39.250 --> 04:10:40.520
code requirement so

04:10:40.520 --> 04:10:44.649
so he's not necessarily aware rounded yeah and the 500 foot

04:10:44.649 --> 04:10:45.639
is based on the

04:10:45.639 --> 04:10:48.819
more updated addresses so I'm not sure what the issue was

04:10:48.819 --> 04:10:50.399
with those but we we

04:10:50.399 --> 04:10:52.860
did get the receipt from our mailing service that showed

04:10:52.860 --> 04:10:53.680
they were all mailed

04:10:53.680 --> 04:10:57.340
and it's supposed to go to every current residents not not

04:10:57.340 --> 04:10:58.319
to a certified

04:10:58.319 --> 04:11:04.629
property owner what it's worth Michelle's I this is the

04:11:04.629 --> 04:11:05.079
first time that

04:11:05.079 --> 04:11:09.610
I was in a 500 foot boundary and I don't want to project

04:11:09.610 --> 04:11:11.000
this as anyone else in

04:11:11.000 --> 04:11:13.879
the audience this is just me but when I went to the mail

04:11:13.879 --> 04:11:15.479
and I had two

04:11:15.479 --> 04:11:19.709
periodicals and a lot of junk mail it was very easy to have

04:11:19.709 --> 04:11:20.760
been slipped

04:11:20.760 --> 04:11:23.709
through and so that's not to say we send out a massive one

04:11:23.709 --> 04:11:25.239
or anything but I will

04:11:25.239 --> 04:11:29.040
say if you're not diligently going through your mail I mean

04:11:29.040 --> 04:11:30.680
it's it's

04:11:30.680 --> 04:11:35.540
possible especially if it's not certified I've just got one

04:11:35.540 --> 04:11:36.520
more and that

04:11:36.520 --> 04:11:40.319
is I don't know if the gentleman who he's not here anymore

04:11:40.319 --> 04:11:41.360
but he was annexed

04:11:41.360 --> 04:11:45.549
into the city said and promised services what what what is

04:11:45.549 --> 04:11:46.799
the what I want to know

04:11:46.799 --> 04:11:52.389
is yeah the process on that because he said that was quite

04:11:52.389 --> 04:11:53.159
quite a long time

04:11:53.159 --> 04:11:57.200
ago and I don't think anything's changed on his property

04:11:57.200 --> 04:11:57.959
and I have it I made a

04:11:57.959 --> 04:12:03.000
note to myself to check into that

04:12:07.159 --> 04:12:11.879
definitely like I'll just confirm what Haley said about the

04:12:11.879 --> 04:12:13.159
most recently

04:12:13.159 --> 04:12:19.739
approved tax roll it's in the section 211 007 C of the

04:12:19.739 --> 04:12:20.840
Texas local government

04:12:20.840 --> 04:12:25.219
code and for the purposes of tracking the super majority

04:12:25.219 --> 04:12:26.879
requirement and

04:12:26.879 --> 04:12:30.059
sending out notifications and counting the opposition for

04:12:30.059 --> 04:12:30.799
creating a super

04:12:30.799 --> 04:12:37.479
majority that's what's required but that can only be

04:12:37.479 --> 04:12:40.479
updated just once a year

04:12:40.479 --> 04:12:43.840
yeah well it's whenever they do it it says the most

04:12:43.840 --> 04:12:45.239
recently approved

04:12:45.239 --> 04:12:49.049
municipal tax roll of real property within 200 feet of the

04:12:49.049 --> 04:12:50.920
property and I

04:12:50.920 --> 04:12:56.510
don't I assume that they would do that once a year if I

04:12:56.510 --> 04:12:59.520
could just add one more

04:12:59.520 --> 04:13:02.879
I don't want to take Julie's thunder for her her boot camp

04:13:02.879 --> 04:13:03.879
slide when we when we

04:13:03.879 --> 04:13:08.079
get to it on notifications with it with the 200 foot

04:13:08.079 --> 04:13:10.360
notification we have again

04:13:10.360 --> 04:13:13.959
like a lot of things in our department we're continuing to

04:13:13.959 --> 04:13:16.120
evolve and we have

04:13:16.120 --> 04:13:19.719
changed those notices at least the information that's going

04:13:19.719 --> 04:13:20.159
out we're

04:13:20.159 --> 04:13:23.149
obviously still providing what's being done but also being

04:13:23.149 --> 04:13:24.120
a little bit more

04:13:24.120 --> 04:13:29.540
explicit about exactly what's being done not so so there's

04:13:29.540 --> 04:13:31.200
been a concern as you

04:13:31.200 --> 04:13:34.670
see saw with I think with the car wash where people are

04:13:34.670 --> 04:13:35.680
invited to come to a

04:13:35.680 --> 04:13:38.299
public hearing and in their mind they have an idea of what

04:13:38.299 --> 04:13:39.120
that what can be

04:13:39.120 --> 04:13:42.879
voted on but in turn it's something different and so we're

04:13:42.879 --> 04:13:44.200
in the process of

04:13:44.200 --> 04:13:47.930
that was something that that that was requested at council

04:13:47.930 --> 04:13:49.000
and it was a good

04:13:49.000 --> 04:13:52.579
idea so we are continually to adjust that and better inform

04:13:52.579 --> 04:13:54.440
the citizens just

04:13:54.440 --> 04:13:57.399
wanted to provide that update

04:13:59.840 --> 04:14:04.819
anyone else fantastic with that I will close the public

04:14:04.819 --> 04:14:05.559
hearing or the work

04:14:05.559 --> 04:14:08.889
session whatever this planning and zoning Commission

04:14:08.889 --> 04:14:10.440
meeting at 936 thank

04:14:10.440 --> 04:14:12.479
you