 Okay, it is nine o'clock and we have a quorum for a call to order the City of Denton Public

00:00:09.920 --> 00:00:14.640
 Utilities Board meeting for Monday, January 9th, 2023.

00:00:14.640 --> 00:00:18.320
 The first item is presentations from members of the public.

00:00:18.320 --> 00:00:20.960
 Does anyone wish to speak?

00:00:20.960 --> 00:00:24.000
 Okay, I see none.

00:00:24.000 --> 00:00:25.640
 We're going to change the agenda slightly.

00:00:25.640 --> 00:00:30.920
 We're going to hop into item A for items for individual consideration.

00:00:30.920 --> 00:00:35.960
 So the first item is to receive nominations and hold an election for the chair, vice chair,

00:00:35.960 --> 00:00:37.040
 and secretary.

00:00:37.040 --> 00:00:38.720
 Do we have any nominations?

00:00:38.720 --> 00:00:42.600
 Madam Chairman, I have a question.

00:00:42.600 --> 00:00:43.600
 Yes.

00:00:43.600 --> 00:00:46.040
 How long are the terms for the officers?

00:00:46.040 --> 00:00:47.040
 One year.

00:00:47.040 --> 00:00:48.040
 One year?

00:00:48.040 --> 00:00:49.040
 Because every year we reelect.

00:00:49.040 --> 00:00:50.040
 Okay.

00:00:50.040 --> 00:00:51.040
 We didn't take care of that.

00:00:51.040 --> 00:00:52.040
 I don't remember doing this last year.

00:00:52.040 --> 00:00:53.040
 That's how it's like.

00:00:53.040 --> 00:00:54.040
 It's a term.

00:00:54.040 --> 00:00:56.040
 Didn't we just do this?

00:00:56.040 --> 00:00:59.720
 We have not been taking care of that properly for many years.

00:00:59.720 --> 00:01:02.880
 And I think we did it right last year, so we're going to continue.

00:01:02.880 --> 00:01:04.680
 And then the next item is the calendar.

00:01:04.680 --> 00:01:08.280
 We weren't approving the calendar, so now we're going to start approving the calendar.

00:01:08.280 --> 00:01:09.280
 Thank you.

00:01:09.280 --> 00:01:10.280
 So good question.

00:01:10.280 --> 00:01:11.280
 Okay.

00:01:11.280 --> 00:01:12.280
 Nominations.

00:01:12.280 --> 00:01:17.000
 Unless there's anything else, I propose we keep it the same for a year.

00:01:17.000 --> 00:01:18.000
 I'll second that.

00:01:18.000 --> 00:01:19.000
 I second.

00:01:19.000 --> 00:01:20.000
 Yeah.

00:01:20.000 --> 00:01:21.000
 Okay.

00:01:21.000 --> 00:01:22.000
 All in favor say aye.

00:01:22.000 --> 00:01:23.000
 Aye.

00:01:23.000 --> 00:01:24.000
 Thank you.

00:01:24.000 --> 00:01:26.720
 Now we'll go back to the consent agenda.

00:01:26.720 --> 00:01:30.400
 Does any board member wish to pull an item on the consent agenda?

00:01:30.400 --> 00:01:31.400
 Yes.

00:01:31.400 --> 00:01:32.400
 Item C.

00:01:32.400 --> 00:01:33.400
 Item C.

00:01:33.400 --> 00:01:34.400
 A.

00:01:34.400 --> 00:01:37.400
 And Barbara said A.

00:01:37.400 --> 00:01:38.400
 Any others?

00:01:38.400 --> 00:01:39.880
 All right.

00:01:39.880 --> 00:01:46.160
 So before we go into that, do we have a motion to approve Items B and D?

00:01:46.160 --> 00:01:47.160
 So move.

00:01:47.160 --> 00:01:48.160
 Second.

00:01:48.160 --> 00:01:49.160
 Okay.

00:01:49.160 --> 00:01:50.160
 All in favor say aye.

00:01:50.160 --> 00:01:51.160
 Aye.

00:01:51.160 --> 00:01:53.340
 Did you get who said that, Kim?

00:01:53.340 --> 00:01:55.320
 It was Barbara and then Devin.

00:01:55.320 --> 00:01:56.320
 Okay.

00:01:56.320 --> 00:01:58.280
 We'll take Item A first.

00:01:58.280 --> 00:02:01.280
 Good morning.

00:02:01.280 --> 00:02:08.160
 Good morning, Madam Chair, board members, Krista Foster, customer service.

00:02:08.160 --> 00:02:11.320
 And how can I help?

00:02:11.320 --> 00:02:22.080
 I am aware of this program and know it really is quite helpful, but I will tell you that

00:02:22.080 --> 00:02:29.440
 in the summertime when it gets really hot and if a landlord is paying the utilities

00:02:29.440 --> 00:02:36.880
 and the tenant's supposed to be taking care of that and they don't, the landlord isn't

00:02:36.880 --> 00:02:41.560
 allowed to turn the utilities off, they just have to keep paying.

00:02:41.560 --> 00:02:44.320
 So help me out with that.

00:02:44.320 --> 00:02:45.320
 Sure.

00:02:45.320 --> 00:02:51.600
 And when a customer is setting up service at a new location, we're going to recommend

00:02:51.600 --> 00:02:57.200
 for the protection of all the different parties that the person who's receiving the service

00:02:57.200 --> 00:03:00.560
 is the person who signs for the service.

00:03:00.560 --> 00:03:06.360
 We know that some landlords prefer to keep those as a single bill, but if they're doing

00:03:06.360 --> 00:03:13.000
 that, they assume that risk of liability for creating an all bills paid situation.

00:03:13.000 --> 00:03:17.960
 If the person who's residing there has services in their name and they're having trouble paying

00:03:17.960 --> 00:03:22.460
 their bills, that would make them eligible for programs such as these.

00:03:22.460 --> 00:03:27.200
 So that's what we would always recommend because you cannot legally, and we can't allow them

00:03:27.200 --> 00:03:32.940
 to turn off because the state of Texas does not allow utilities to be shut off in order

00:03:32.940 --> 00:03:35.360
 to try to force an eviction.

00:03:35.360 --> 00:03:39.280
 They have to go through the legal process and get a judge's order.

00:03:39.280 --> 00:03:40.280
 Sure.

00:03:40.280 --> 00:03:41.280
 Okay.

00:03:41.280 --> 00:03:42.280
 Thank you very much.

00:03:42.280 --> 00:03:51.440
 I know that Interfaith Ministries does a really good job with this, and so I am very happy

00:03:51.440 --> 00:03:53.360
 that we work with them.

00:03:53.360 --> 00:03:57.720
 I'm very proud to be able to have a program that will assist all these things like this.

00:03:57.720 --> 00:03:58.720
 Thank you very much.

00:03:58.720 --> 00:03:59.720
 You're very welcome.

00:03:59.720 --> 00:04:00.720
 I move approval.

00:04:00.720 --> 00:04:01.720
 Okay.

00:04:01.720 --> 00:04:05.040
 Do we have a second?

00:04:05.040 --> 00:04:06.040
 Ben seconds.

00:04:06.040 --> 00:04:07.560
 All in favor say aye.

00:04:07.560 --> 00:04:08.560
 Aye.

00:04:08.560 --> 00:04:09.560
 Carried.

00:04:09.560 --> 00:04:10.560
 Item C.

00:04:10.560 --> 00:04:14.880
 I shall await our speaker's arrival.

00:04:14.880 --> 00:04:18.560
 Good morning, PUB Board.

00:04:18.560 --> 00:04:23.360
 Terry Daunty, EASIS and GM at Denton and New Swatley.

00:04:23.360 --> 00:04:28.640
 My question is, this was a fabulous idea and unfortunately we didn't have it in place two

00:04:28.640 --> 00:04:30.000
 years ago.

00:04:30.000 --> 00:04:36.120
 However, what I couldn't tell from the documentation we were provided is what the levels of coverage

00:04:36.120 --> 00:04:42.160
 are they're providing, and what would trigger the application of their covering of such

00:04:42.160 --> 00:04:44.120
 an outage.

00:04:44.120 --> 00:04:46.960
 Sure.

00:04:46.960 --> 00:04:52.840
 These quotes that we receive are based upon Ford prices that are in existence at the time,

00:04:52.840 --> 00:05:01.680
 so this particular quote is a little stale, and before we actually execute the insurance

00:05:01.680 --> 00:05:06.840
 binder, we'd get a refresh on it, hopefully we'd see the number go down, but the coverage

00:05:06.840 --> 00:05:10.560
 limits are still being negotiated.

00:05:10.560 --> 00:05:19.600
 Normally be 15 to 18 million dollars of total coverage for this premium, and the conditions

00:05:19.600 --> 00:05:22.720
 upon which we could draw upon it are very simple.

00:05:22.720 --> 00:05:29.680
 If there's an outage for any reason, whether it's fuel supply or mechanical failure, the

00:05:29.680 --> 00:05:37.680
 first of the 12 units, so each unit's rated at 18.75 megawatts, that's a deductible amount,

00:05:37.680 --> 00:05:43.960
 so we have to have an outage that would be in excess of 18.75 in order to actually file

00:05:43.960 --> 00:05:45.640
 a claim.

00:05:45.640 --> 00:05:51.240
 So in the event of mechanical failure, how many units at the deck would that represent?

00:05:51.240 --> 00:05:56.440
 Well, let's just say we had a transmission issue, we couldn't get any power out of the

00:05:56.440 --> 00:05:59.840
 plant, and it would cover all but one.

00:05:59.840 --> 00:06:00.960
 Very good.

00:06:00.960 --> 00:06:01.960
 Thank you.

00:06:01.960 --> 00:06:02.960
 Yeah.

00:06:02.960 --> 00:06:03.960
 Thank you.

00:06:03.960 --> 00:06:04.960
 Thank you.

00:06:04.960 --> 00:06:05.960
 Any other questions?

00:06:05.960 --> 00:06:06.960
 No, ma'am.

00:06:06.960 --> 00:06:09.000
 Do we have a motion to approve item C?

00:06:09.000 --> 00:06:10.000
 So moved.

00:06:10.000 --> 00:06:11.000
 Okay.

00:06:11.000 --> 00:06:12.000
 And a second?

00:06:12.000 --> 00:06:13.000
 Second.

00:06:13.000 --> 00:06:14.400
 I don't know.

00:06:14.400 --> 00:06:15.400
 Somebody said it.

00:06:15.400 --> 00:06:16.400
 Okay.

00:06:16.400 --> 00:06:18.040
 All in favor say aye.

00:06:18.040 --> 00:06:19.040
 Aye.

00:06:19.040 --> 00:06:20.040
 Okay.

00:06:20.040 --> 00:06:21.040
 That carries.

00:06:21.040 --> 00:06:25.880
 The next item is receive a report, hold a discussion, and give staff direction regarding

00:06:25.880 --> 00:06:29.760
 the 2023 schedule.

00:06:29.760 --> 00:06:33.040
 We had a schedule that looks just fine.

00:06:33.040 --> 00:06:38.640
 It's every second and fourth Monday, except for November and December.

00:06:38.640 --> 00:06:42.680
 Do we have a motion to approve the schedule?

00:06:42.680 --> 00:06:43.960
 So moved.

00:06:43.960 --> 00:06:44.960
 Devin moved.

00:06:44.960 --> 00:06:45.960
 Second?

00:06:45.960 --> 00:06:46.960
 Ben, seconds?

00:06:46.960 --> 00:06:48.960
 All in favor say aye.

00:06:48.960 --> 00:06:49.960
 Aye.

00:06:49.960 --> 00:06:52.520
 Motion carries.

00:06:52.520 --> 00:07:01.040
 After approval of December 2nd, 2022 minutes, have we reviewed the minutes?

00:07:01.040 --> 00:07:04.280
 Do we have a motion to approve the December 12th minutes?

00:07:04.280 --> 00:07:05.280
 Second.

00:07:05.280 --> 00:07:06.280
 Okay.

00:07:06.280 --> 00:07:07.280
 Who seconded?

00:07:07.280 --> 00:07:08.280
 You moved.

00:07:08.280 --> 00:07:09.280
 Ben?

00:07:09.280 --> 00:07:10.280
 Lee seconded.

00:07:10.280 --> 00:07:11.280
 All in favor say aye.

00:07:11.280 --> 00:07:12.280
 Aye.

00:07:12.280 --> 00:07:13.280
 Motion carries.

00:07:13.280 --> 00:07:20.240
 Item D. I know Billy needs to recuse himself from this item.

00:07:20.240 --> 00:07:38.560
 Good morning PUB board members.

00:07:38.560 --> 00:07:39.560
 My name is Scott Fetig.

00:07:39.560 --> 00:07:43.520
 I'm a project manager with Capital Projects, and I'm here today for the consideration

00:07:43.520 --> 00:07:50.000
 of a construction contract award for Neighborhood 7A project.

00:07:50.000 --> 00:07:54.400
 This project is part of the 2019 bonding program, and a little bit of the overview for this

00:07:54.400 --> 00:08:00.240
 project, we will be reconstructing roadways, we'll be doing some sidewalk connectivity,

00:08:00.240 --> 00:08:04.040
 along with wastewater and water upgrades as well.

00:08:04.040 --> 00:08:09.000
 Some of the streets to be included in this project are Bernard, Leslie, Wisteria, and

00:08:09.000 --> 00:08:11.920
 Camellia.

00:08:11.920 --> 00:08:18.640
 So we advertise this project as a CSP, or competitive sealed proposal, once the evaluations

00:08:18.640 --> 00:08:25.360
 were completed, Mountain Cascade came out number one with 92.8 points and a total of

00:08:25.360 --> 00:08:30.080
 just over 7.6 million for cost.

00:08:30.080 --> 00:08:32.640
 So overview of the schedule.

00:08:32.640 --> 00:08:37.920
 We started design and completed it in August of 2022, and of course we're here today for

00:08:37.920 --> 00:08:41.440
 consideration from PUB.

00:08:41.440 --> 00:08:46.580
 And if so approved, we'll move forward with council on January 24th.

00:08:46.580 --> 00:08:51.800
 With approval there, we anticipate a notice to proceed quarter one of 2023.

00:08:51.800 --> 00:09:00.280
 And then we're estimating a final completion of quarter one 2024.

00:09:00.280 --> 00:09:05.520
 And with that, we recommend consideration approval for a construction contract for Neighborhood

00:09:05.520 --> 00:09:12.800
 7A in the not to exceed amount of just over 7.6 million, which does include the 5% project

00:09:12.800 --> 00:09:15.320
 contingency.

00:09:15.320 --> 00:09:17.440
 And with that, I'll open it up for any questions.

00:09:17.440 --> 00:09:18.920
 Yes, I have a question.

00:09:18.920 --> 00:09:24.400
 These streets do not seem to be related to one another, and it seemed a little bit far

00:09:24.400 --> 00:09:26.840
 removed from one another, at least on the map that you presented.

00:09:26.840 --> 00:09:30.400
 I wonder if you could go back to that?

00:09:30.400 --> 00:09:33.840
 Yes, sir.

00:09:33.840 --> 00:09:38.320
 I'm just curious, it doesn't have anything to do with the value of the contract or, you

00:09:38.320 --> 00:09:43.480
 know, the process you're on to go get approval, but I'm just curious why these particular

00:09:43.480 --> 00:09:47.680
 streets, which don't seem to be particularly connected to one another, are all included

00:09:47.680 --> 00:09:49.000
 in this particular package.

00:09:49.000 --> 00:09:50.000
 Right.

00:09:50.000 --> 00:09:56.440
 And so when they look at these, they're looking at OCMI report, of course, which is this OCMI,

00:09:56.440 --> 00:10:00.040
 which is the index, the street condition, the way that the condition that the street

00:10:00.040 --> 00:10:01.040
 is in.

00:10:01.040 --> 00:10:04.720
 So they gauge that they take samples, they look at the street, the subgrade, what the

00:10:04.720 --> 00:10:09.000
 condition looks like, and they value it that way and decide whether or not they want to

00:10:09.000 --> 00:10:11.480
 put it on the bond to be reconstructed.

00:10:11.480 --> 00:10:16.400
 And so they try to group it in areas so we stay in a closer area when we're doing a project.

00:10:16.400 --> 00:10:20.360
 And these, all these streets kind of fell in an area that's relatively close, that all

00:10:20.360 --> 00:10:22.400
 require them to be reconstructed.

00:10:22.400 --> 00:10:27.480
 Okay, so these streets were strictly selected based on their evaluated condition over some

00:10:27.480 --> 00:10:28.480
 period of time.

00:10:28.480 --> 00:10:31.280
 Was that by the designer or by previous?

00:10:31.280 --> 00:10:32.600
 By previous.

00:10:32.600 --> 00:10:37.600
 So they work with the streets department in their group, they send out a contracted company

00:10:37.600 --> 00:10:41.560
 that goes out and takes these samples, evaluates them, and gets that back to the street and

00:10:41.560 --> 00:10:45.520
 then they combine a list and provide that to us to which streets need to be reconstructed.

00:10:45.520 --> 00:10:46.520
 Okay.

00:10:46.520 --> 00:10:47.520
 Thank you.

00:10:47.520 --> 00:10:48.520
 You're welcome.

00:10:48.520 --> 00:10:49.520
 Devin?

00:10:49.520 --> 00:10:50.520
 Yes, sir.

00:10:50.520 --> 00:10:51.520
 Hello.

00:10:51.520 --> 00:10:52.520
 I have two questions.

00:10:52.520 --> 00:10:58.800
 First, the project that was recently approved near Malone, I believe, was construction manager

00:10:58.800 --> 00:11:01.960
 at risk as opposed to the competitive seal bid.

00:11:01.960 --> 00:11:06.640
 Is there a reason why one was selected for that neighborhood and a different one was selected

00:11:06.640 --> 00:11:07.640
 for this neighborhood?

00:11:07.640 --> 00:11:15.080
 I may get Trevor to come up here and answer that one for me.

00:11:15.080 --> 00:11:16.080
 Good morning, everybody.

00:11:16.080 --> 00:11:18.660
 Trevor Crane, Director of Capital Projects.

00:11:18.660 --> 00:11:24.760
 So we evaluate each of those projects really based on complexity, how big they are.

00:11:24.760 --> 00:11:28.080
 Really what it comes down to is really the complexity of the project.

00:11:28.080 --> 00:11:32.400
 So the CMAR is usually a little more expensive on the front end, but you get some more benefits

00:11:32.400 --> 00:11:39.840
 on the back end, and so we really evaluate those and determine if using that CMAR process

00:11:39.840 --> 00:11:42.280
 is really going to be worth that money on the front end.

00:11:42.280 --> 00:11:46.760
 If it's really kind of a straightforward process, then we don't want to kind of spend that money

00:11:46.760 --> 00:11:48.480
 on the front end if we don't necessarily need it.

00:11:48.480 --> 00:11:52.880
 So we evaluate all these projects before we get to that point to determine which one's

00:11:52.880 --> 00:11:56.920
 going to be the best one going forward, whether it's a CSP or that CMAR.

00:11:56.920 --> 00:11:57.920
 Okay.

00:11:57.920 --> 00:12:02.120
 And so in this case, this is a more straightforward project, like I guess the wastewater and

00:12:02.120 --> 00:12:03.880
 water are under the roads is somewhere.

00:12:03.880 --> 00:12:04.880
 Correct, yeah.

00:12:04.880 --> 00:12:09.360
 And so we look at a whole lot of different things, so complexity of what the work is,

00:12:09.360 --> 00:12:16.240
 kind of coordination with different projects that are in the area, coordination with stakeholders,

00:12:16.240 --> 00:12:17.480
 really a lot of things that go in it.

00:12:17.480 --> 00:12:22.920
 So we felt this was a perfect project for a competitive sale proposal instead of the

00:12:22.920 --> 00:12:23.920
 CMAR.

00:12:23.920 --> 00:12:26.960
 And so going forward, we might see both depending on each neighborhood.

00:12:26.960 --> 00:12:27.960
 You will.

00:12:27.960 --> 00:12:28.960
 Yeah, you'll definitely see some.

00:12:28.960 --> 00:12:34.040
 We do have one coming up that's, I think it's 60 million south, or we have two projects

00:12:34.040 --> 00:12:38.640
 that we're going to bundle together because they're very similar work, a lot of coordination,

00:12:38.640 --> 00:12:40.000
 and you will see CMAR.

00:12:40.000 --> 00:12:43.640
 So you'll see both of those, both of those different styles coming forward.

00:12:43.640 --> 00:12:44.640
 Okay.

00:12:44.640 --> 00:12:45.640
 Thank you.

00:12:45.640 --> 00:12:46.640
 Yeah, no problem.

00:12:46.640 --> 00:12:51.000
 And my other question was regarding the project scope mentioned, sidewalk connectivity.

00:12:51.000 --> 00:12:52.220
 Yes, sir.

00:12:52.220 --> 00:12:55.000
 But it doesn't indicate kind of wear or scale.

00:12:55.000 --> 00:12:58.000
 Yeah, I can elaborate on it a little bit.

00:12:58.000 --> 00:13:00.980
 The major connectivity that we're going to see is on Bernard Street.

00:13:00.980 --> 00:13:07.480
 So right now from Parvin there at Edenia Park, it moves north there on the west side of Bernard.

00:13:07.480 --> 00:13:11.520
 We're going to connect that all the way up to Acme, or that there's a piece of it there

00:13:11.520 --> 00:13:16.720
 that just went anew on the east side of Bernard, and we're going to make that a complete connectivity

00:13:16.720 --> 00:13:20.480
 all the way down the park to give them a little safer area for people walking between the park

00:13:20.480 --> 00:13:21.480
 and that area.

00:13:21.480 --> 00:13:24.400
 And is that a one side of the street?

00:13:24.400 --> 00:13:30.760
 Okay, so everything will be on the west side of Bernard from Parvin all the way up to Acme.

00:13:30.760 --> 00:13:31.760
 Okay.

00:13:31.760 --> 00:13:32.760
 Thank you.

00:13:32.760 --> 00:13:33.760
 You're welcome.

00:13:33.760 --> 00:13:34.760
 Other questions?

00:13:34.760 --> 00:13:35.760
 All right.

00:13:35.760 --> 00:13:38.380
 Do we have a motion to approve?

00:13:38.380 --> 00:13:39.380
 So move.

00:13:39.380 --> 00:13:40.380
 Devin moves.

00:13:40.380 --> 00:13:41.380
 Do we have second?

00:13:41.380 --> 00:13:42.380
 Lee seconds.

00:13:42.380 --> 00:13:43.380
 All in favor say aye.

00:13:43.380 --> 00:13:44.380
 Aye.

00:13:44.380 --> 00:13:58.440
 And I'll go find Billy, hang on.

00:13:58.440 --> 00:14:04.520
 The next item is to consider recommending the adoption of an ordinance for the construction

00:14:04.520 --> 00:14:10.800
 of Hickory Creek Interceptor 3 project.

00:14:10.800 --> 00:14:15.400
 Good morning, bird members.

00:14:15.400 --> 00:14:16.400
 My name is Tracy Beck.

00:14:16.400 --> 00:14:20.920
 I'm a project manager with Capital Projects, and today I'd like to discuss a little bit

00:14:20.920 --> 00:14:24.160
 about the Hickory Creek Interceptor Phase 3 with you.

00:14:24.160 --> 00:14:28.040
 Excuse me, ma'am, could you speak up a little bit?

00:14:28.040 --> 00:14:29.040
 I sure can.

00:14:29.040 --> 00:14:30.040
 Thank you.

00:14:30.040 --> 00:14:31.040
 I'll speak in a little bit.

00:14:31.040 --> 00:14:34.480
 Hickory Creek Interceptor Phase 3 is Phase 3.

00:14:34.480 --> 00:14:41.240
 It is continuation of the Phase 1 and 2 on the south end near I-35W, extends approximately

00:14:41.240 --> 00:14:45.080
 9,700 feet, about 1.8 miles to the north.

00:14:45.080 --> 00:14:50.120
 The project is going to be a 30-inch replacement of an existing 12-inch main.

00:14:50.120 --> 00:14:54.640
 The purpose is because the 12-inch is undersized and a little bit aging.

00:14:54.640 --> 00:14:56.760
 The project was designed in-house.

00:14:56.760 --> 00:15:00.240
 We went out for competitive sealed proposals for this project.

00:15:00.240 --> 00:15:06.600
 The recipients were approximately seven of our bidders, and Wilson Contracting was the

00:15:06.600 --> 00:15:12.640
 lowest on scoring, and they were very close on the lowest of overall price as well.

00:15:12.640 --> 00:15:17.240
 The scoring was 88.2 out of 100.

00:15:17.240 --> 00:15:22.440
 The final dollar amount that they presented was 5.7 million and some change, and that

00:15:22.440 --> 00:15:25.920
 includes the 5% contingency.

00:15:25.920 --> 00:15:30.480
 The project's been underway for some years, and we're finally getting it to construction.

00:15:30.480 --> 00:15:31.760
 We have completed the design.

00:15:31.760 --> 00:15:33.520
 We've completed the background work.

00:15:33.520 --> 00:15:37.280
 Today is awarding as well as going to council at the end of the month, and then we look

00:15:37.280 --> 00:15:40.200
 to doing notice of proceed in the first quarter of this year.

00:15:40.200 --> 00:15:44.920
 The project's approximately 13 months long, so we look for having that completed about

00:15:44.920 --> 00:15:49.720
 this time next year, say second quarter of 2024.

00:15:49.720 --> 00:15:55.280
 With that, I'm recommending the award to Wilson Contracting for a bid amount of 5.5 million

00:15:55.280 --> 00:15:56.840
 and some change.

00:15:56.840 --> 00:16:00.040
 That includes the contingency of 5%.

00:16:00.040 --> 00:16:01.040
 Any questions?

00:16:01.040 --> 00:16:02.040
 Questions?

00:16:02.040 --> 00:16:03.040
 Yes.

00:16:03.040 --> 00:16:04.040
 Go ahead, Lee.

00:16:04.040 --> 00:16:08.560
 Why did you decide to do this particular project in-house on design?

00:16:08.560 --> 00:16:14.240
 This was actually designed prior to when I took over, and it's just a legacy project

00:16:14.240 --> 00:16:15.240
 that we're moving out.

00:16:15.240 --> 00:16:19.280
 At some point, I believe that when we look at our staff load, we do like using our internal

00:16:19.280 --> 00:16:20.280
 staff.

00:16:20.280 --> 00:16:22.920
 There's benefits to using internal staff as well.

00:16:22.920 --> 00:16:25.960
 Oh, certainly, I don't have a problem with it.

00:16:25.960 --> 00:16:27.280
 I was just curious.

00:16:27.280 --> 00:16:31.040
 We approved so many design and engineering evaluation contracts.

00:16:31.040 --> 00:16:34.680
 It was just interesting this one was designed in-house, so it's a curiosity question.

00:16:34.680 --> 00:16:37.760
 Trevor Crane, Director of Capital Projects.

00:16:37.760 --> 00:16:42.040
 As these projects come forward from the different stakeholders, we have a process set up where

00:16:42.040 --> 00:16:46.960
 myself and our Deputy City Engineer will evaluate those projects.

00:16:46.960 --> 00:16:51.480
 He runs our in-house engineering department, so depending on what that project looks like,

00:16:51.480 --> 00:16:56.040
 the complexity, whether they have the workload availability, or anything like that, we evaluate

00:16:56.040 --> 00:17:01.440
 those projects and determine, one, we'll make a recommendation to the stakeholder, "Hey,

00:17:01.440 --> 00:17:04.520
 we think this is going to be better for an external project."

00:17:04.520 --> 00:17:09.480
 We look at the schedule that they need, the pricing that is available, funding, those

00:17:09.480 --> 00:17:14.640
 types of things, and whether his team has the availability to do it in-house or not.

00:17:14.640 --> 00:17:18.760
 We evaluate all those projects as they come through from the stakeholders to determine

00:17:18.760 --> 00:17:19.760
 the best path forward.

00:17:19.760 --> 00:17:23.920
 Oh, is it the fact that you are basically improving existing infrastructure, make it

00:17:23.920 --> 00:17:26.160
 a little easier lift in the in-house town?

00:17:26.160 --> 00:17:30.480
 Yeah, this project is really just that 30-inch line.

00:17:30.480 --> 00:17:37.000
 Our engineering team has a lot of experience in designing those types of things.

00:17:37.000 --> 00:17:43.360
 They designed some of the previous ones before, and they had the availability to be able to

00:17:43.360 --> 00:17:48.960
 design it rather quickly, so it just made sense to allow them to do that in-house.

00:17:48.960 --> 00:17:49.960
 Thank you.

00:17:49.960 --> 00:17:50.960
 Yes, sir?

00:17:50.960 --> 00:17:53.760
 I have just one quick, I see we had seven bidders.

00:17:53.760 --> 00:17:59.640
 There was a time when we would not be able to get people to bid, so are things finally

00:17:59.640 --> 00:18:01.960
 loosening up a little bit, where we're getting more ...

00:18:01.960 --> 00:18:09.480
 Yeah, I would say we are seeing a lot of different contractors coming in to bid.

00:18:09.480 --> 00:18:15.140
 This one was, since it was just mainly that one type of work, so you'll see when we bundle

00:18:15.140 --> 00:18:20.640
 a lot of these projects and we have a lot of different types of work in those, then

00:18:20.640 --> 00:18:24.920
 sometimes we don't get as many because they'll have to sub some of those things out.

00:18:24.920 --> 00:18:28.440
 I would say just the complexity of this work is one of the things that allowed it to have

00:18:28.440 --> 00:18:29.440
 that many.

00:18:29.440 --> 00:18:34.940
 I would also say that just the changes that have been made in the last couple of years

00:18:34.940 --> 00:18:39.760
 with the city of Denton, I think a lot of contractors are wanting to get in town and

00:18:39.760 --> 00:18:43.400
 do a lot of work with us just because of some of the things that we've done, the way we

00:18:43.400 --> 00:18:47.000
 deliver projects, and just been a lot easier to work with.

00:18:47.000 --> 00:18:48.000
 Oh, good.

00:18:48.000 --> 00:18:49.000
 That's good for the citizens.

00:18:49.000 --> 00:18:50.000
 Definitely, definitely.

00:18:50.000 --> 00:18:51.000
 Yeah.

00:18:51.000 --> 00:18:52.000
 All right.

00:18:52.000 --> 00:18:53.000
 Any other questions?

00:18:53.000 --> 00:18:54.000
 All right.

00:18:54.000 --> 00:18:55.720
 Do we have a motion to approve item E?

00:18:55.720 --> 00:18:56.720
 Yes.

00:18:56.720 --> 00:18:57.720
 Ben moved.

00:18:57.720 --> 00:18:58.720
 Lee seconded.

00:18:58.720 --> 00:19:00.720
 All in favor, say aye.

00:19:00.720 --> 00:19:01.720
 Aye.

00:19:01.720 --> 00:19:02.720
 Aye.

00:19:02.720 --> 00:19:03.720
 Thank you very much.

00:19:03.720 --> 00:19:04.720
 Management reports.

00:19:04.720 --> 00:19:11.800
 Madam Chair, members of the POB, just to go over future agenda items, obviously we had

00:19:11.800 --> 00:19:14.440
 the officer elections, appreciate that.

00:19:14.440 --> 00:19:18.480
 There was a couple of items listed for today that did not make today's agenda.

00:19:18.480 --> 00:19:24.000
 We are working to get those back to you likely for the next meeting or early February, but

00:19:24.000 --> 00:19:29.440
 on the Lyft station and also the budget and rates for electric, it'll be more of a financial

00:19:29.440 --> 00:19:30.440
 update.

00:19:30.440 --> 00:19:35.440
 And then on the 23rd, we still have scheduled the Greensense program update.

00:19:35.440 --> 00:19:37.120
 We are kind of working through that still.

00:19:37.120 --> 00:19:42.320
 We're still planning to go back to the sustainability committee as a follow up.

00:19:42.320 --> 00:19:46.320
 Our plan is to bring kind of the two presentations that we planned for them and single presentation

00:19:46.320 --> 00:19:47.320
 to you.

00:19:47.320 --> 00:19:53.240
 At the end of the day, we're going to be seeking a recommendation from both the POB and sustainability

00:19:53.240 --> 00:19:59.300
 committee on the Greensense program to go to the council, probably likely in May now

00:19:59.300 --> 00:20:01.440
 or after May.

00:20:01.440 --> 00:20:05.440
 So we'll have plenty of time if there's a need for us to come back and do additional

00:20:05.440 --> 00:20:07.840
 discussions with you, we'll have time to do that.

00:20:07.840 --> 00:20:09.440
 But those are the items on the agenda.

00:20:09.440 --> 00:20:13.720
 Obviously, what's not listed on here is the various budgets for you.

00:20:13.720 --> 00:20:18.880
 We'll be listing those out for the next meeting, but we have kick started some of those processes

00:20:18.880 --> 00:20:21.360
 already internally for all the utilities.

00:20:21.360 --> 00:20:26.000
 So that's on the future agendas and the new business, we still have the first two items

00:20:26.000 --> 00:20:27.520
 that are related to the Greensense program.

00:20:27.520 --> 00:20:31.360
 We hope to be able to address those with you through that process.

00:20:31.360 --> 00:20:37.400
 And there was a request at the last meeting for an update on the ERCOT lawsuit.

00:20:37.400 --> 00:20:41.400
 And we're arguing that the day in closed session after we do this meeting, we'll be meeting

00:20:41.400 --> 00:20:43.920
 downstairs with the city attorney's office.

00:20:43.920 --> 00:20:47.400
 So with that, I'll be happy to answer any questions or there's something else that you'd

00:20:47.400 --> 00:20:49.400
 like to see on a future agenda.

00:20:49.400 --> 00:20:52.640
 Please let us know.

00:20:52.640 --> 00:20:54.120
 Okay.

00:20:54.120 --> 00:20:55.720
 That brings us to concluding items.

00:20:55.720 --> 00:21:02.560
 Does any board member wish to add a future agenda item or have anything to say?

00:21:02.560 --> 00:21:04.440
 Seeing none.

00:21:04.440 --> 00:21:05.440
 Okay.

00:21:05.440 --> 00:21:12.400
 And we'll go into the closed meeting and legal gave me a nice little thing that I can say.

00:21:12.400 --> 00:21:18.680
 The Public Utilities Board will now at 921 a.m. convene into a closed meeting to deliberate

00:21:18.680 --> 00:21:23.080
 the closed meeting item set forth on the agenda, which include the following.

00:21:23.080 --> 00:21:30.160
 APUB 23008, deliberations regarding certain public power utilities competitive matters

00:21:30.160 --> 00:21:37.360
 under Texas government code section 551.086, consultation with attorneys under U.S. Texas

00:21:37.360 --> 00:21:41.400
 government code section 551.071.