00:00:00.000 --> 00:00:05.000
 - Okay, it is nine o'clock and we do have a quorum,

00:00:05.000 --> 00:00:11.520
 so a call to order the public utility board meeting

00:00:11.520 --> 00:00:15.800
 for the city of Denton on Monday, October 24th, 2022.

00:00:15.800 --> 00:00:19.400
 The first item is presentations from members of the public.

00:00:19.400 --> 00:00:21.820
 Is anyone from the public wish to speak?

00:00:21.820 --> 00:00:25.880
 Seeing none, we'll move on to consent agenda.

00:00:25.880 --> 00:00:29.760
 Does any board member wish to pull agenda items A through F?

00:00:29.760 --> 00:00:30.720
 Mr. Rybeck.

00:00:30.720 --> 00:00:32.640
 - I would like to pull agenda item C

00:00:32.640 --> 00:00:35.880
 as it's related to item B in our regular order of business.

00:00:35.880 --> 00:00:37.500
 - Okay, any others?

00:00:37.500 --> 00:00:42.360
 Okay, seeing none, do we have approval of A, B, D, E,

00:00:42.360 --> 00:00:44.680
 and F or a motion for approval?

00:00:44.680 --> 00:00:45.680
 - So moved.

00:00:45.680 --> 00:00:48.520
 - Okay, Larry's gonna move, Lee's gonna second.

00:00:48.520 --> 00:00:50.160
 All in favor say aye.

00:00:50.160 --> 00:00:51.760
 - Aye. - Opposed?

00:00:51.760 --> 00:00:52.640
 Carries. - Aye.

00:00:52.640 --> 00:00:57.280
 - Next item is consider approval of the October 10th, 2022

00:00:57.280 --> 00:00:59.820
 minutes, were there any corrections or changes?

00:00:59.820 --> 00:01:03.160
 Do we have a motion to approve those minutes?

00:01:03.160 --> 00:01:05.640
 - So moved. - Barbara moves.

00:01:05.640 --> 00:01:07.880
 Then seconds, all in favor say aye.

00:01:07.880 --> 00:01:09.200
 - Aye. - Aye.

00:01:09.200 --> 00:01:14.200
 - And the third item, item B is to discuss with Kimley

00:01:14.200 --> 00:01:18.280
 Horner and Associates the design services for neighborhoods

00:01:18.280 --> 00:01:20.980
 two and six for capital projects and engineering.

00:01:20.980 --> 00:01:26.640
 In the amount of $5,726,000.

00:01:26.640 --> 00:01:28.440
 - Perfect, thank you.

00:01:28.440 --> 00:01:30.440
 Let me get this pulled up really quick.

00:01:30.440 --> 00:01:38.780
 - Oh, I'm sorry, I got out of order.

00:01:38.780 --> 00:01:42.120
 Marcella, you didn't keep me in order.

00:01:42.120 --> 00:01:42.960
 Item C.

00:01:42.960 --> 00:01:44.320
 - I just assumed you were doing it here,

00:01:44.320 --> 00:01:46.520
 the item B, item C.

00:01:46.520 --> 00:01:50.640
 - So is that okay for us to include this as item B?

00:01:50.640 --> 00:01:51.960
 - I was hoping that we would, thank you.

00:01:51.960 --> 00:01:53.560
 - Okay, all right, very good.

00:01:53.560 --> 00:01:55.520
 (laughing)

00:01:55.520 --> 00:01:56.960
 Very good, go ahead.

00:01:56.960 --> 00:01:58.320
 - I'll do the design phase contract

00:01:58.320 --> 00:01:59.760
 and then I do have a presentation

00:01:59.760 --> 00:02:02.320
 for the second contract as well.

00:02:02.320 --> 00:02:06.560
 So good morning board members, my name is Seth Garcia.

00:02:06.560 --> 00:02:09.040
 I'm a program manager in capital projects.

00:02:09.040 --> 00:02:10.840
 Today I have a brief presentation for you

00:02:10.840 --> 00:02:14.160
 for the design contract for neighborhoods two and six.

00:02:14.160 --> 00:02:16.600
 This project is associated with the 2019

00:02:16.600 --> 00:02:18.120
 street reconstruction bond.

00:02:18.120 --> 00:02:23.120
 So just a brief overview of the neighborhood.

00:02:23.120 --> 00:02:26.040
 So neighborhood two and six does contain 118

00:02:26.040 --> 00:02:27.640
 roadway segments.

00:02:27.640 --> 00:02:29.160
 It's kind of balanced by the limits

00:02:29.160 --> 00:02:32.720
 of Bonnie Bray on the West, University to the North,

00:02:32.720 --> 00:02:37.140
 Bolivar Street on the East and Interstate 35 to the South.

00:02:37.140 --> 00:02:39.400
 It is our largest package associated

00:02:39.400 --> 00:02:42.840
 with the 2019 street reconstruction bond program.

00:02:42.840 --> 00:02:45.800
 We're looking to do roughly 56,000 linear feet

00:02:45.800 --> 00:02:47.360
 of roadway improvements.

00:02:47.360 --> 00:02:49.940
 And then as you can see about 30,000 linear feet

00:02:49.940 --> 00:02:52.820
 of water and wastewater main replacements each.

00:02:52.820 --> 00:02:55.720
 We will be performing a sidewalk connectivity assessment

00:02:55.720 --> 00:02:57.160
 with this project as well.

00:02:57.160 --> 00:03:00.280
 So we're looking at gaps, correcting ADA ramps,

00:03:00.280 --> 00:03:02.920
 those sorts of things for the sidewalk connectivity.

00:03:02.920 --> 00:03:05.440
 And we're also performing a street lighting photometric

00:03:05.440 --> 00:03:07.760
 study to look at additional street lighting install

00:03:07.760 --> 00:03:09.560
 with this package as well.

00:03:09.560 --> 00:03:12.480
 And I did wanna highlight this is our second

00:03:12.480 --> 00:03:14.960
 construction manager at risk project that we'll be doing.

00:03:14.960 --> 00:03:15.880
 - That was my question.

00:03:15.880 --> 00:03:18.400
 So when you say second construction manager

00:03:18.400 --> 00:03:21.040
 at risk project, could you give us a little definition?

00:03:21.040 --> 00:03:24.320
 - Yeah, so historically the city of Denton

00:03:24.320 --> 00:03:27.760
 has done projects two ways either competitive seal proposal

00:03:27.760 --> 00:03:31.280
 or a invitation for bid and IFB a low bid process.

00:03:31.280 --> 00:03:34.020
 Construction manager at risk is actually a process

00:03:34.020 --> 00:03:37.240
 where we go through an RFP stage to where we bring

00:03:37.240 --> 00:03:41.080
 on our design consultant and our general contractor

00:03:41.080 --> 00:03:42.440
 at the same time.

00:03:42.440 --> 00:03:44.440
 Together through the design phase,

00:03:44.440 --> 00:03:46.840
 we work to design that project,

00:03:46.840 --> 00:03:49.320
 perform construction schedule sequencing,

00:03:49.320 --> 00:03:52.440
 and then we move towards a guaranteed maximum price.

00:03:52.440 --> 00:03:55.600
 So the construction manager at risk is still required

00:03:55.600 --> 00:03:59.040
 to competitive, excuse me, competitively bid the project

00:03:59.040 --> 00:04:02.700
 to subcontractors if they wish to self-perform the work.

00:04:02.700 --> 00:04:06.160
 They can choose to bid on that work as well.

00:04:06.160 --> 00:04:09.320
 And then it's a best value selection process

00:04:09.320 --> 00:04:11.080
 to award the different packages.

00:04:11.080 --> 00:04:12.520
 - I think that's gonna answer my question

00:04:12.520 --> 00:04:14.400
 on the prior consent agenda item,

00:04:14.400 --> 00:04:18.260
 which is the general contractor pre-construction services.

00:04:18.260 --> 00:04:19.100
 - Yes, sir.

00:04:19.100 --> 00:04:21.600
 - So that general contractor has been selected

00:04:21.600 --> 00:04:23.680
 as your construction manager at risk,

00:04:23.680 --> 00:04:26.000
 but not your general contractor.

00:04:26.000 --> 00:04:27.800
 - So they're one and the same.

00:04:27.800 --> 00:04:30.200
 So he is the construction manager at risk

00:04:30.200 --> 00:04:31.520
 and the general contractor,

00:04:31.520 --> 00:04:34.040
 so he will oversee all of the subcontracts.

00:04:34.040 --> 00:04:37.020
 He could perform different portions of the work

00:04:37.020 --> 00:04:40.760
 if he competitively wins those individual packages,

00:04:40.760 --> 00:04:42.360
 or he could win none of the work

00:04:42.360 --> 00:04:44.440
 and essentially just be the general contractor

00:04:44.440 --> 00:04:45.740
 and only receive the fee

00:04:45.740 --> 00:04:47.660
 from the construction phase contract.

00:04:47.660 --> 00:04:49.200
 - Okay, well, that answers my other question,

00:04:49.200 --> 00:04:52.440
 which is why were you hiring them before you had a design?

00:04:52.440 --> 00:04:53.900
 - So we bring them on together

00:04:53.900 --> 00:04:55.600
 because the idea behind CMAR

00:04:55.600 --> 00:04:57.360
 is they work together as a team.

00:04:57.360 --> 00:04:59.740
 So you're ultimately putting together a team

00:04:59.740 --> 00:05:02.160
 that's gonna work through construction sequencing.

00:05:02.160 --> 00:05:05.840
 We wanna get feedback on, we have 118 roadway segments.

00:05:05.840 --> 00:05:06.860
 Where do you wanna start?

00:05:06.860 --> 00:05:09.400
 What makes the most sense for the best place to start?

00:05:09.400 --> 00:05:11.180
 - So it's kind of an integrated design project

00:05:11.180 --> 00:05:12.080
 from that standpoint.

00:05:12.080 --> 00:05:12.960
 - Absolutely.

00:05:12.960 --> 00:05:16.960
 So it's really working with three brains is better than two,

00:05:16.960 --> 00:05:19.240
 especially bringing on the construction piece

00:05:19.240 --> 00:05:22.680
 to put together the best packages to construct.

00:05:22.680 --> 00:05:24.740
 And we also get open book cost modeling

00:05:24.740 --> 00:05:26.080
 from them through this.

00:05:26.080 --> 00:05:27.520
 - In a GMP project, right?

00:05:27.520 --> 00:05:28.400
 - Exactly.

00:05:28.400 --> 00:05:31.480
 So we're able, especially in all the market fluctuation

00:05:31.480 --> 00:05:33.440
 we're seeing, that's been a great tool to us

00:05:33.440 --> 00:05:37.080
 to see how we're actually gonna award this project

00:05:37.080 --> 00:05:38.320
 in different pieces.

00:05:38.320 --> 00:05:39.400
 - Okay, well, thank you very much.

00:05:39.400 --> 00:05:41.600
 I think that answers my questions on both pieces.

00:05:41.600 --> 00:05:42.840
 - Good, perfect.

00:05:42.840 --> 00:05:43.760
 - I have another question.

00:05:43.760 --> 00:05:44.740
 - Yes, sir.

00:05:44.740 --> 00:05:46.880
 - So you mentioned the sidewall connectivity assessment.

00:05:46.880 --> 00:05:51.720
 Is that to add ramps, repair existing?

00:05:51.720 --> 00:05:53.860
 Is it adding any new sidewalks?

00:05:53.860 --> 00:05:54.700
 - So it's both.

00:05:54.700 --> 00:05:55.520
 - What is it?

00:05:55.520 --> 00:05:56.360
 - It's both.

00:05:56.360 --> 00:05:57.960
 So we're looking at existing ramps,

00:05:57.960 --> 00:06:02.080
 correcting those with the actual intersections

00:06:02.080 --> 00:06:03.160
 where we're working.

00:06:03.160 --> 00:06:06.200
 We're looking at sidewalks running parallel to the roadways,

00:06:06.200 --> 00:06:08.760
 whether or not they have deficiencies and need replacement.

00:06:08.760 --> 00:06:11.600
 And then we're also doing a kind of a gap assessment.

00:06:11.600 --> 00:06:13.940
 Are there sections that don't have sidewalks

00:06:13.940 --> 00:06:15.680
 that need sidewalks?

00:06:15.680 --> 00:06:18.600
 This area encompasses a lot of University of North Texas.

00:06:18.600 --> 00:06:21.440
 So we will already have a lot of sidewalks identified

00:06:21.440 --> 00:06:26.200
 through our ADA plan that need sidewalks added to fill gaps.

00:06:26.200 --> 00:06:28.040
 So those will be done with this project

00:06:28.040 --> 00:06:29.740
 just through different funding sources.

00:06:29.740 --> 00:06:30.940
 - Okay.

00:06:30.940 --> 00:06:32.360
 - Barbara had a question too.

00:06:32.360 --> 00:06:37.360
 - Yeah, I wanted to ask, this is the 2019 bond issue.

00:06:37.360 --> 00:06:40.320
 And considering the prices of what they are now

00:06:40.320 --> 00:06:41.940
 are infinitely greater,

00:06:43.520 --> 00:06:45.620
 how do you reconcile things like that?

00:06:45.620 --> 00:06:49.560
 - So I may let finance speak to this a little bit too.

00:06:49.560 --> 00:06:51.320
 But one of the beauties of CMAR, like I said,

00:06:51.320 --> 00:06:52.960
 is there's open book cost modeling.

00:06:52.960 --> 00:06:55.580
 So we're looking at things such as value engineering.

00:06:55.580 --> 00:06:59.380
 One of the things we did on our first CM at risk project

00:06:59.380 --> 00:07:01.040
 in Southeast in package B

00:07:01.040 --> 00:07:03.480
 was we actually looked at a different subgrade section

00:07:03.480 --> 00:07:06.600
 than what the typical city standard was.

00:07:06.600 --> 00:07:09.840
 So our engineer performed an evaluation

00:07:09.840 --> 00:07:11.320
 and we are actually able to change

00:07:11.320 --> 00:07:13.800
 from 12 inches of lime treated subgrade

00:07:13.800 --> 00:07:15.720
 to eight inches of flake space.

00:07:15.720 --> 00:07:17.880
 It gave us the same roadway life

00:07:17.880 --> 00:07:20.760
 and decreased the cost by about $500,000

00:07:20.760 --> 00:07:22.360
 on that one package alone.

00:07:22.360 --> 00:07:24.080
 So we use different things like that

00:07:24.080 --> 00:07:26.140
 to find savings within the program.

00:07:26.140 --> 00:07:28.920
 That is one of the benefits of CMAR.

00:07:28.920 --> 00:07:31.120
 Like I said, we look at value engineering ideas

00:07:31.120 --> 00:07:32.940
 from the construction manager.

00:07:32.940 --> 00:07:35.680
 We vet those through our internal stakeholders

00:07:35.680 --> 00:07:37.840
 and through the design engineer

00:07:37.840 --> 00:07:40.200
 to make sure we have savings.

00:07:40.200 --> 00:07:42.460
 As far as overall project funding,

00:07:42.460 --> 00:07:45.640
 we're utilizing some funds from the street fund

00:07:45.640 --> 00:07:48.640
 to help supplement the 2019 bond program.

00:07:48.640 --> 00:07:50.880
 And so far that has been sufficient enough

00:07:50.880 --> 00:07:52.780
 to cover our costs to date.

00:07:52.780 --> 00:07:55.680
 - Thank you, Devin.

00:07:55.680 --> 00:08:00.320
 - A follow up regarding the sidewalk connectivity question.

00:08:00.320 --> 00:08:02.400
 Are you only evaluating the streets

00:08:02.400 --> 00:08:03.960
 where you're doing other work

00:08:03.960 --> 00:08:07.880
 or are you actually evaluating the entire neighborhood?

00:08:07.880 --> 00:08:09.940
 - So we're only working on the streets

00:08:09.940 --> 00:08:11.320
 where we're actually doing work.

00:08:11.320 --> 00:08:12.800
 If we were to go through

00:08:12.800 --> 00:08:15.960
 and identify all of the sidewalks within the neighborhood,

00:08:15.960 --> 00:08:17.240
 the entire neighborhood,

00:08:17.240 --> 00:08:19.480
 our scope would grow to a point

00:08:19.480 --> 00:08:21.920
 to where it wouldn't really make sense

00:08:21.920 --> 00:08:23.040
 with our projects to do this.

00:08:23.040 --> 00:08:25.760
 So we're really focusing on the streets that we're touching,

00:08:25.760 --> 00:08:29.080
 kind of that holistic overview of those segments

00:08:29.080 --> 00:08:32.520
 and then looking at different ADA and sidewalk packages

00:08:32.520 --> 00:08:34.840
 for the streets that we may not be impacting.

00:08:34.840 --> 00:08:37.960
 - Okay, and this area not only has the university,

00:08:37.960 --> 00:08:39.300
 which has a lot of pedestrian traffic,

00:08:39.300 --> 00:08:41.840
 but it also has several schools

00:08:41.840 --> 00:08:43.920
 that are moving in the next few years.

00:08:43.920 --> 00:08:45.280
 - Absolutely. - And that's gonna impact

00:08:45.280 --> 00:08:46.380
 where that foot traffic is.

00:08:46.380 --> 00:08:49.080
 Like right now, Newton Raiser is on Alice

00:08:49.080 --> 00:08:50.800
 and it will soon be on Fulton.

00:08:50.800 --> 00:08:51.640
 - Correct.

00:08:51.640 --> 00:08:54.840
 - There are lots and lots of ADA ramps on Alice,

00:08:54.840 --> 00:08:56.820
 but unfortunately Fulton is not,

00:08:56.820 --> 00:08:58.840
 not Alice, I'm sorry, Malone,

00:08:58.840 --> 00:09:01.160
 but unfortunately Fulton doesn't appear to be

00:09:01.160 --> 00:09:04.920
 on the plan here, so.

00:09:04.920 --> 00:09:07.520
 - And I'd just like to mention,

00:09:07.520 --> 00:09:09.400
 I'm Becky Davini, the city engineer.

00:09:09.400 --> 00:09:11.840
 We actually have a meeting today with DISD.

00:09:11.840 --> 00:09:13.880
 It's a three hour long work session

00:09:13.880 --> 00:09:17.140
 between planning, engineering, development services

00:09:17.140 --> 00:09:18.680
 to talk about these future projects,

00:09:18.680 --> 00:09:20.880
 but we meet monthly with the school district

00:09:20.880 --> 00:09:22.800
 and talk about where they're moving.

00:09:22.800 --> 00:09:25.280
 We know Newton Raiser moving, Calhoun's moving,

00:09:25.280 --> 00:09:26.920
 Denton High School's already moved.

00:09:26.920 --> 00:09:28.680
 So there's a lot of other things that go into it

00:09:28.680 --> 00:09:30.480
 besides just the sidewalks.

00:09:30.480 --> 00:09:32.640
 I mean, school zones need to be relocated.

00:09:32.640 --> 00:09:34.480
 There's multiple things that Brett Bouchois,

00:09:34.480 --> 00:09:36.380
 who's gonna make a presentation in a minute,

00:09:36.380 --> 00:09:38.420
 our deputy city engineer, his engineering team

00:09:38.420 --> 00:09:41.020
 is a part of making sure those things are happening.

00:09:41.020 --> 00:09:44.880
 - Yes, go ahead, Larry.

00:09:44.880 --> 00:09:45.840
 - Thanks, Chair.

00:09:45.840 --> 00:09:48.520
 I didn't hear you mention anything about cycling lanes.

00:09:48.520 --> 00:09:50.120
 Are they part of this project?

00:09:50.120 --> 00:09:52.560
 - So that is something that we evaluate.

00:09:52.560 --> 00:09:54.760
 There are a few roadway segments that we're touching

00:09:54.760 --> 00:09:56.280
 that do have existing bike lanes.

00:09:56.280 --> 00:10:00.460
 So Welch, I believe portions of Scripture

00:10:00.460 --> 00:10:03.080
 have some bike lanes further to the west

00:10:03.080 --> 00:10:04.640
 of where we're looking at.

00:10:04.640 --> 00:10:06.480
 That is something that we do evaluate.

00:10:06.480 --> 00:10:07.600
 - And these will be new lanes

00:10:07.600 --> 00:10:09.480
 or just upgrading existing lanes?

00:10:09.480 --> 00:10:11.020
 - So potentially both.

00:10:11.020 --> 00:10:12.920
 We kind of leave it as an open book

00:10:12.920 --> 00:10:15.960
 going into the project to see what funding we'll allow for

00:10:15.960 --> 00:10:19.240
 with the different funding sources that we can pull from.

00:10:19.240 --> 00:10:21.800
 Also making sure that we have the roadway with

00:10:21.800 --> 00:10:24.840
 to be able to accommodate a new bike lane

00:10:24.840 --> 00:10:26.280
 or making sure we're putting improvements

00:10:26.280 --> 00:10:28.640
 to protect the existing bike lanes.

00:10:28.640 --> 00:10:29.480
 - Okay, thank you.

00:10:29.480 --> 00:10:30.720
 - Yes, sir.

00:10:30.720 --> 00:10:31.560
 - All right.

00:10:31.560 --> 00:10:32.380
 - Okay.

00:10:34.240 --> 00:10:36.840
 So a quick breakdown of the design costs.

00:10:36.840 --> 00:10:39.480
 So we broke this into two kind of separate packages.

00:10:39.480 --> 00:10:41.460
 The first being a lump sum package.

00:10:41.460 --> 00:10:43.660
 That is our preliminary and final design

00:10:43.660 --> 00:10:46.160
 for the roadway and utilities.

00:10:46.160 --> 00:10:47.360
 Also our data collection.

00:10:47.360 --> 00:10:51.320
 So Topo survey, our geotechnical analysis

00:10:51.320 --> 00:10:53.840
 and our illumination art that photometric study

00:10:53.840 --> 00:10:56.040
 is also included as a lump sum cost.

00:10:56.040 --> 00:10:59.360
 Our hourly additional services include project management,

00:10:59.360 --> 00:11:01.240
 all those coordination meetings with the city

00:11:01.240 --> 00:11:03.700
 and the construction manager at risk.

00:11:04.720 --> 00:11:07.880
 Hours for our consultant to be at our public meetings

00:11:07.880 --> 00:11:09.220
 to answer questions.

00:11:09.220 --> 00:11:12.720
 Level B and Level A Sue, the actual illumination design

00:11:12.720 --> 00:11:15.580
 and then of course our construction phase services as well.

00:11:15.580 --> 00:11:18.880
 So this contract will take everything on the design side

00:11:18.880 --> 00:11:21.240
 through the entire portions of the project.

00:11:21.240 --> 00:11:24.040
 - A quick question.

00:11:24.040 --> 00:11:24.880
 - Yes, sir.

00:11:24.880 --> 00:11:28.120
 - In the hourly services, you're including record drawings?

00:11:28.120 --> 00:11:28.960
 - Correct.

00:11:28.960 --> 00:11:30.880
 - Isn't that part of design service?

00:11:30.880 --> 00:11:31.700
 - It is.

00:11:31.700 --> 00:11:35.000
 - So record drawings are actually a second piece to it.

00:11:35.000 --> 00:11:37.880
 So we'll receive red lines from the actual contractor

00:11:37.880 --> 00:11:42.080
 and then they will make those two conformed as bills.

00:11:42.080 --> 00:11:44.120
 Exactly, correct.

00:11:44.120 --> 00:11:44.960
 That is correct.

00:11:44.960 --> 00:11:46.720
 Good question.

00:11:46.720 --> 00:11:47.960
 - Yes, very good question.

00:11:47.960 --> 00:11:52.540
 - So in total, our contract value is just over 5.7 million.

00:11:52.540 --> 00:11:56.440
 So quickly for the project schedule,

00:11:56.440 --> 00:11:57.520
 with y'all's approval today,

00:11:57.520 --> 00:12:00.800
 we'll seek council approval for the design contract

00:12:00.800 --> 00:12:03.360
 and the CMAR contract on November 1st.

00:12:03.360 --> 00:12:06.880
 We are anticipating our first construction packages to GMP

00:12:06.880 --> 00:12:10.000
 and be ready sometime around quarter one, 2024.

00:12:10.000 --> 00:12:12.280
 And then of course we are trying to wrap up

00:12:12.280 --> 00:12:16.080
 all of the 2019 street reconstruction bond projects

00:12:16.080 --> 00:12:18.200
 by Q4 of 2026.

00:12:18.200 --> 00:12:19.680
 So this project being the biggest

00:12:19.680 --> 00:12:22.760
 is spanning the longest timeframe.

00:12:22.760 --> 00:12:24.880
 So we've got about four years to construct,

00:12:24.880 --> 00:12:28.400
 design and construct all 118 roadway segments.

00:12:31.120 --> 00:12:33.960
 So with that staff recommends adoption of the ordinance

00:12:33.960 --> 00:12:35.720
 with the city of Denton and Kimley horn

00:12:35.720 --> 00:12:38.120
 for a little over 5.7 million.

00:12:38.120 --> 00:12:39.080
 - Okay, thank you.

00:12:39.080 --> 00:12:39.920
 Other questions?

00:12:39.920 --> 00:12:41.720
 - I'm happy to answer any more questions.

00:12:41.720 --> 00:12:45.180
 - Yes, go ahead.

00:12:45.180 --> 00:12:47.880
 - I would like to move that we accept item B

00:12:47.880 --> 00:12:50.240
 from the individual agenda and item C

00:12:50.240 --> 00:12:51.580
 from the consent agenda.

00:12:51.580 --> 00:12:54.720
 - We have to do two different stuff.

00:12:54.720 --> 00:12:55.720
 - We cannot do them together?

00:12:55.720 --> 00:13:00.720
 - No, so you'd like to move to approve consent item C.

00:13:01.720 --> 00:13:03.120
 - And do we have a second?

00:13:03.120 --> 00:13:04.040
 Everybody's seconding?

00:13:04.040 --> 00:13:05.520
 All in favor say aye.

00:13:05.520 --> 00:13:06.840
 - Aye.

00:13:06.840 --> 00:13:09.080
 - Okay, do we have a motion to approve

00:13:09.080 --> 00:13:11.420
 the individual consideration item B?

00:13:11.420 --> 00:13:12.320
 - Move that.

00:13:12.320 --> 00:13:13.160
 - Second.

00:13:13.160 --> 00:13:15.260
 - And Lee seconds, Ben moved.

00:13:15.260 --> 00:13:18.280
 Larry second or Lee second, all in favor say aye.

00:13:18.280 --> 00:13:19.280
 - Aye.

00:13:19.280 --> 00:13:20.360
 - Carries.

00:13:20.360 --> 00:13:21.200
 - Thank y'all.

00:13:21.200 --> 00:13:22.160
 - Thank you.

00:13:22.160 --> 00:13:23.000
 Thank you, Marcel.

00:13:23.000 --> 00:13:29.800
 Next is item C, contract with Mountain Cascade of Texas LLC

00:13:30.160 --> 00:13:33.160
 for the construction of 35 E Mayhill Utility

00:13:33.160 --> 00:13:36.160
 Relocations Project in the amount of $15,897.15.

00:13:36.160 --> 00:13:42.640
 15 cents.

00:13:42.640 --> 00:13:44.960
 - Good morning council.

00:13:44.960 --> 00:13:45.800
 I'm Robin Davis.

00:13:45.800 --> 00:13:48.560
 I'm a project manager for Capital Projects.

00:13:48.560 --> 00:13:51.400
 And today we are asking you to approve the contract

00:13:51.400 --> 00:13:54.620
 with Mountain Cascade to relocate the water

00:13:54.620 --> 00:13:57.800
 and wastewater utilities along the I-35 corridor

00:13:57.800 --> 00:14:01.360
 between Mayhill and Loop 288.

00:14:01.360 --> 00:14:07.980
 So recently, TxDOT has acquired right away in the area

00:14:07.980 --> 00:14:10.840
 so they can expand and widen I-35.

00:14:10.840 --> 00:14:14.400
 So it is our responsibility to move our utilities

00:14:14.400 --> 00:14:15.400
 out of their way.

00:14:15.400 --> 00:14:18.040
 And so this is a reimbursement project

00:14:18.040 --> 00:14:20.640
 that they will be re-reimbursing us for as well.

00:14:20.640 --> 00:14:27.120
 We pre-qualified three bidders for the project

00:14:27.120 --> 00:14:30.140
 so we could meet their anticipated schedule.

00:14:30.140 --> 00:14:34.100
 And we submitted the project to these three bidders

00:14:34.100 --> 00:14:35.000
 that were pre-qualified

00:14:35.000 --> 00:14:37.000
 and the low bidder was Mountain Cascade.

00:14:37.000 --> 00:14:42.920
 So the project schedule would be,

00:14:42.920 --> 00:14:44.040
 if you guys approve this today,

00:14:44.040 --> 00:14:47.920
 we'll go to council for approval on November 1st.

00:14:47.920 --> 00:14:51.260
 We anticipate giving them a partial notice to proceed

00:14:51.260 --> 00:14:53.880
 so they can begin ordering materials.

00:14:53.880 --> 00:14:56.920
 That is allowed through the TxDOT reimbursement agreement

00:14:56.920 --> 00:14:59.120
 we just can't allow them to actually start construction

00:14:59.120 --> 00:15:03.720
 onsite until the standard utility agreement

00:15:03.720 --> 00:15:06.600
 is fully executed by both the city and TxDOT.

00:15:06.600 --> 00:15:10.080
 So we anticipate giving them a partial notice to proceed.

00:15:10.080 --> 00:15:12.520
 Once council approves it in November 1st

00:15:12.520 --> 00:15:14.280
 and then in December,

00:15:14.280 --> 00:15:17.040
 once it's fully executed with the city and TxDOT,

00:15:17.040 --> 00:15:19.040
 then we'll issue them a full notice to proceed

00:15:19.040 --> 00:15:21.880
 so they can begin construction in early January.

00:15:21.880 --> 00:15:23.880
 And we expect the project to be complete

00:15:23.880 --> 00:15:28.880
 in September of 2023, right in time for them to let I-35.

00:15:28.880 --> 00:15:32.560
 So with the 5% contingency,

00:15:32.560 --> 00:15:35.640
 we expect a total estimated construction costs

00:15:35.640 --> 00:15:36.880
 of right at 15 million.

00:15:36.880 --> 00:15:41.640
 And with that, we just hope that you guys

00:15:41.640 --> 00:15:43.120
 will approve this contract.

00:15:43.120 --> 00:15:44.600
 The staff recommends it.

00:15:44.600 --> 00:15:45.560
 - Questions?

00:15:45.560 --> 00:15:46.400
 Go ahead, Devin.

00:15:46.400 --> 00:15:51.040
 - So what portion of this is paid by TxDOT

00:15:51.040 --> 00:15:52.680
 and what portion is paid by--

00:15:52.680 --> 00:15:56.720
 - So all of it is paid by TxDOT except for the betterment,

00:15:56.720 --> 00:16:00.240
 which we are upgrading a portion of the 20-inch,

00:16:00.240 --> 00:16:02.200
 well, actually all of the 20-inch

00:16:02.200 --> 00:16:04.520
 to the 24-inch water line

00:16:04.520 --> 00:16:08.240
 in anticipation of our ever-growing city and needs.

00:16:08.240 --> 00:16:12.680
 And so the estimated cost of that is right around 747,000.

00:16:12.680 --> 00:16:14.480
 And that's the part that the portion

00:16:14.480 --> 00:16:16.960
 that the city will be responsible for.

00:16:16.960 --> 00:16:19.520
 - And we recently had some updates

00:16:19.520 --> 00:16:23.000
 on the upcoming sewer master plan.

00:16:23.000 --> 00:16:26.680
 Does this area have any of the sewer lines

00:16:26.680 --> 00:16:28.480
 that run over to the Hickory Creek area

00:16:28.480 --> 00:16:30.560
 or are they in a different location?

00:16:30.560 --> 00:16:31.720
 - I believe the Hickory Creek area

00:16:31.720 --> 00:16:32.720
 would be a different location.

00:16:32.720 --> 00:16:34.520
 This is between Mayhill and Loop 288.

00:16:34.520 --> 00:16:37.360
 I think Hickory Creek is further south.

00:16:37.360 --> 00:16:39.520
 - Right, from the lift station on Hickory Creek.

00:16:39.520 --> 00:16:41.640
 I mean, there's a line, a major line

00:16:41.640 --> 00:16:44.000
 that runs from the lift station on Hickory Creek

00:16:44.000 --> 00:16:47.440
 up to the current wastewater treatment plant.

00:16:47.440 --> 00:16:48.360
 I didn't know if that was--

00:16:48.360 --> 00:16:50.880
 - So what we're relocating is in the same area.

00:16:50.880 --> 00:16:53.200
 It would still feed and go to the same places,

00:16:53.200 --> 00:16:55.080
 except we're just replacing it with a new line.

00:16:55.080 --> 00:16:57.520
 So I don't know if that answers your question, but--

00:16:57.520 --> 00:17:00.120
 - Okay, so it doesn't sound like the sewer is impacted.

00:17:00.120 --> 00:17:02.080
 Thank you. - Okay.

00:17:02.080 --> 00:17:03.440
 - Go ahead, Lee. - Yes, sir.

00:17:03.440 --> 00:17:05.040
 - I just have a quick question.

00:17:05.040 --> 00:17:08.280
 So there's gonna be more expansion on I-35

00:17:08.280 --> 00:17:10.160
 or is this in relation to the expansion

00:17:10.160 --> 00:17:12.040
 that just was finished?

00:17:12.040 --> 00:17:13.320
 - No, there's more.

00:17:13.320 --> 00:17:15.400
 - More expansion, thank you.

00:17:15.400 --> 00:17:16.240
 - Always.

00:17:17.320 --> 00:17:19.920
 - I-35's been under construction for 40 years.

00:17:19.920 --> 00:17:21.240
 - Yeah. - Oh, longer.

00:17:21.240 --> 00:17:23.800
 Not since '69. - Okay, oh, okay.

00:17:23.800 --> 00:17:24.880
 (laughing)

00:17:24.880 --> 00:17:25.720
 Go ahead.

00:17:25.720 --> 00:17:29.880
 - Oh, just wanted to mention to that point,

00:17:29.880 --> 00:17:33.400
 this is only one of four contracts we'll be bringing forward.

00:17:33.400 --> 00:17:36.280
 I-35 is going to have expansion and widen

00:17:36.280 --> 00:17:37.680
 not only from Mayhill,

00:17:37.680 --> 00:17:39.400
 but all the way north to the county line.

00:17:39.400 --> 00:17:42.200
 So Robin's just delivering the first phase

00:17:42.200 --> 00:17:43.880
 of many phases of projects

00:17:43.880 --> 00:17:46.520
 that the utilities are going to be relocated.

00:17:46.520 --> 00:17:49.440
 We're going as far north as Milam Road.

00:17:49.440 --> 00:17:53.000
 - Wow, go ahead, Ben.

00:17:53.000 --> 00:17:55.960
 - Yeah, so I was wondering specifically

00:17:55.960 --> 00:17:57.240
 what side of the highway,

00:17:57.240 --> 00:18:02.200
 maybe businesses would be impacted, that sort of thing?

00:18:02.200 --> 00:18:04.520
 - So there were some businesses impacted.

00:18:04.520 --> 00:18:06.960
 We were going through parking lots like Chewy's,

00:18:06.960 --> 00:18:10.720
 places like that, but we've already acquired that right away

00:18:10.720 --> 00:18:12.160
 or the easements that was needed

00:18:12.160 --> 00:18:13.640
 and made those arrangements with them.

00:18:13.640 --> 00:18:14.920
 So that's all been taken care of

00:18:14.920 --> 00:18:19.400
 and TxDOT reimburses us for those costs as well.

00:18:19.400 --> 00:18:20.240
 - Okay.

00:18:20.240 --> 00:18:23.240
 - Are we experiencing the same

00:18:23.240 --> 00:18:28.640
 shortages of materials that we're seeing everywhere else?

00:18:28.640 --> 00:18:31.480
 Okay, so allowing them to go ahead and acquire--

00:18:31.480 --> 00:18:33.520
 - That was the reason for the partial notice to proceed,

00:18:33.520 --> 00:18:35.120
 so they could go ahead and get a jumpstart

00:18:35.120 --> 00:18:36.280
 on ordering those materials.

00:18:36.280 --> 00:18:38.240
 - Good, that was my question.

00:18:38.240 --> 00:18:39.600
 All right, other questions?

00:18:39.600 --> 00:18:41.440
 - Yes, Barbara.

00:18:41.440 --> 00:18:45.320
 Do you have an idea that the county's got a bond thing

00:18:45.320 --> 00:18:48.920
 to vote on now for this election?

00:18:48.920 --> 00:18:53.720
 Where is the projected 288 coming into?

00:18:53.720 --> 00:18:57.200
 It's somehow along there.

00:18:57.200 --> 00:18:58.640
 - I believe, are you talking about

00:18:58.640 --> 00:19:00.600
 the north end of loop 288?

00:19:00.600 --> 00:19:02.200
 I believe that's gonna come out,

00:19:02.200 --> 00:19:04.840
 it's gonna just connect where loop 288 ends now

00:19:04.840 --> 00:19:06.600
 and I believe it's gonna come out over by

00:19:06.600 --> 00:19:08.880
 like the Ponder exit, is that right?

00:19:08.880 --> 00:19:09.720
 - Yeah. - Yeah.

00:19:09.720 --> 00:19:12.880
 - Okay, but there's not a further loop on that.

00:19:12.880 --> 00:19:14.040
 - Not that I'm aware of.

00:19:14.040 --> 00:19:15.320
 - Okay, thank you.

00:19:15.320 --> 00:19:17.480
 - All right.

00:19:17.480 --> 00:19:21.000
 Do we have a motion to approve item C?

00:19:21.000 --> 00:19:23.720
 Lee is moving.

00:19:23.720 --> 00:19:25.160
 - I'll second.

00:19:25.160 --> 00:19:27.160
 - Barbara second, all in favor say aye.

00:19:27.160 --> 00:19:28.720
 - Aye. - Aye.

00:19:28.720 --> 00:19:30.240
 - Thank you.

00:19:30.240 --> 00:19:31.080
 Item D.

00:19:31.080 --> 00:19:32.960
 - All right, I don't know how to get out of this.

00:19:32.960 --> 00:19:34.520
 - So Madam Chair and members of the PB,

00:19:34.520 --> 00:19:36.840
 so for your management reports,

00:19:36.840 --> 00:19:39.760
 we did include a dashboard, two dashboards

00:19:39.760 --> 00:19:42.200
 for June and July for the DEC.

00:19:42.200 --> 00:19:44.960
 Finance department is here, they've submitted that to you

00:19:44.960 --> 00:19:46.720
 if you have any questions on that.

00:19:46.720 --> 00:19:49.800
 - Questions?

00:19:49.800 --> 00:19:50.640
 - Nope. - Okay.

00:19:50.640 --> 00:19:54.040
 - All right, so going to your future agenda items

00:19:54.040 --> 00:19:55.680
 and also the new business items,

00:19:55.680 --> 00:19:58.760
 I did wanna point out that we have moved

00:19:58.760 --> 00:20:02.120
 the Green Sense program update to January

00:20:02.120 --> 00:20:05.000
 and the reason for that is that we did go

00:20:05.000 --> 00:20:06.480
 to the sustainability committee,

00:20:06.480 --> 00:20:08.440
 there was a number of questions that they had,

00:20:08.440 --> 00:20:09.760
 we are planning to go back to them,

00:20:09.760 --> 00:20:11.640
 I certainly wanna be respectful of the committee

00:20:11.640 --> 00:20:14.160
 and make sure that we kind of vet things out to them

00:20:14.160 --> 00:20:15.480
 before we come to you,

00:20:15.480 --> 00:20:16.960
 so that way when we come to you,

00:20:16.960 --> 00:20:18.520
 we'll have their recommendation,

00:20:18.520 --> 00:20:20.880
 we'll provide any backup that we provided to them to you,

00:20:20.880 --> 00:20:23.320
 I already sent the backup to you this morning,

00:20:23.320 --> 00:20:24.840
 or I will send it to you this morning,

00:20:24.840 --> 00:20:28.560
 what we sent to them in the initial presentation.

00:20:28.560 --> 00:20:30.440
 Within that presentation, there is an ISR

00:20:30.440 --> 00:20:33.760
 that does address some of the questions that you had,

00:20:33.760 --> 00:20:37.120
 certainly Mr. Beck and so if there's any questions on that,

00:20:37.120 --> 00:20:38.640
 please feel free to reach out to me,

00:20:38.640 --> 00:20:43.480
 but with that, no other changes to the items,

00:20:43.480 --> 00:20:45.480
 happy to answer any questions you may have.

00:20:45.480 --> 00:20:48.880
 - I don't see any questions.

00:20:48.880 --> 00:20:51.320
 All right, so concluding items,

00:20:51.320 --> 00:20:54.360
 does any board member wish to have anything

00:20:54.360 --> 00:20:55.720
 put on a future agenda item

00:20:55.720 --> 00:20:57.960
 or have anything to say to the public?

00:20:57.960 --> 00:20:59.240
 Mr. Rybak. - I have a question,

00:20:59.240 --> 00:21:01.160
 Madam Chairman. - Okay.

00:21:01.160 --> 00:21:03.840
 - I'm looking forward to those dates on the future agenda.

00:21:03.840 --> 00:21:07.800
 We have some dates upcoming in November and December.

00:21:07.800 --> 00:21:10.720
 The December meeting, second December meeting

00:21:10.720 --> 00:21:13.840
 would occur on the Monday following Christmas,

00:21:13.840 --> 00:21:16.320
 which is the observed holiday.

00:21:16.320 --> 00:21:19.800
 And next month, our meeting, fourth meeting,

00:21:19.800 --> 00:21:23.480
 or fourth Monday is the Monday after Thanksgiving.

00:21:23.480 --> 00:21:25.280
 Are we planning to have those meetings?

00:21:25.280 --> 00:21:29.120
 - We typically only have the second Monday

00:21:29.120 --> 00:21:30.680
 in November and December.

00:21:30.680 --> 00:21:31.520
 - Thank you. - That's what

00:21:31.520 --> 00:21:33.400
 our schedule is saying right now.

00:21:33.400 --> 00:21:34.240
 - Very good, thank you.

00:21:34.240 --> 00:21:35.440
 Well, this shows up on my calendar

00:21:35.440 --> 00:21:37.080
 that I saw that day that reminded me.

00:21:37.080 --> 00:21:37.920
 - Oh, okay. - Thank you.

00:21:37.920 --> 00:21:39.120
 - The second Monday?

00:21:39.120 --> 00:21:40.680
 - So it'll be the,

00:21:40.680 --> 00:21:46.200
 our next PUB board meeting is November 14th,

00:21:46.200 --> 00:21:48.880
 and then we have one on December 12th.

00:21:48.880 --> 00:21:51.880
 Did I, I said that right?

00:21:51.880 --> 00:21:53.800
 Yeah, it's the second Monday.

00:21:53.800 --> 00:21:55.560
 - We'll have, Kim will take a look at them

00:21:55.560 --> 00:21:57.520
 and if they're still on your calendar,

00:21:57.520 --> 00:21:58.720
 she'll get them removed.

00:22:00.200 --> 00:22:01.040
 - Okay.

00:22:01.040 --> 00:22:04.200
 All right, then we'll move into the work session.

00:22:04.200 --> 00:22:06.240
 The first one is receive a report,

00:22:06.240 --> 00:22:08.160
 hold a discussion and give staff direction

00:22:08.160 --> 00:22:12.080
 regarding the water and wastewater impact study fee,

00:22:12.080 --> 00:22:14.080
 impact fee study.

00:22:14.080 --> 00:22:15.760
 - It's kind of a tongue twister.

00:22:15.760 --> 00:22:17.520
 Good morning, Chair, PUB members,

00:22:17.520 --> 00:22:20.040
 Nick Benson, Assistant Director of Finance.

00:22:20.040 --> 00:22:21.440
 Wanted to do a really quick introduction.

00:22:21.440 --> 00:22:23.160
 I'll turn it over to our consultants

00:22:23.160 --> 00:22:25.080
 helping us update this study.

00:22:25.080 --> 00:22:27.560
 So we do have April here with us from Kimberly Horn.

00:22:27.560 --> 00:22:29.400
 - Good morning. - We have John here with us,

00:22:29.400 --> 00:22:31.960
 sitting right here, just wave your hand, John, there you go.

00:22:31.960 --> 00:22:34.160
 Then Trent, Trent's sitting over here also.

00:22:34.160 --> 00:22:36.520
 So great individuals to work with.

00:22:36.520 --> 00:22:37.960
 They've been working with us about a month

00:22:37.960 --> 00:22:39.440
 to update this study.

00:22:39.440 --> 00:22:41.600
 Definitely have a good presentation for you today.

00:22:41.600 --> 00:22:44.480
 So if you have questions, please let them know.

00:22:44.480 --> 00:22:45.600
 I can return to the podium

00:22:45.600 --> 00:22:47.000
 if there's something else you have a question on

00:22:47.000 --> 00:22:49.760
 or of course we have water people here also.

00:22:49.760 --> 00:22:52.880
 So let me get the presentation pulled up really quick.

00:22:59.640 --> 00:23:02.800
 Okay, April, come on up and I'll get it ready for you.

00:23:02.800 --> 00:23:07.000
 Okay, there's a keyboard here if you need it,

00:23:07.000 --> 00:23:08.320
 otherwise you can just click.

00:23:08.320 --> 00:23:09.160
 - Thank you.

00:23:09.160 --> 00:23:11.880
 Public utility board,

00:23:11.880 --> 00:23:14.280
 thank you for this opportunity to speak to you today.

00:23:14.280 --> 00:23:17.000
 We have a water and wastewater impact fee study update.

00:23:17.000 --> 00:23:18.960
 This is the very start.

00:23:18.960 --> 00:23:21.040
 From an outline perspective,

00:23:21.040 --> 00:23:23.800
 we will provide an objective,

00:23:23.800 --> 00:23:25.800
 run through some impact fee basics,

00:23:25.800 --> 00:23:28.200
 as well as the capital improvements advisory committee,

00:23:28.200 --> 00:23:31.560
 the service area update and a few next steps coming up.

00:23:31.560 --> 00:23:34.080
 So as far as our objective today,

00:23:34.080 --> 00:23:36.840
 we really want to provide an overview

00:23:36.840 --> 00:23:39.400
 of the capital improvements advisory committee,

00:23:39.400 --> 00:23:43.600
 as well as present upcoming updates to the impact fee study

00:23:43.600 --> 00:23:47.360
 related to the service areas for water and wastewater.

00:23:47.360 --> 00:23:48.880
 So some of the basics.

00:23:48.880 --> 00:23:50.720
 When it comes to an impact fee study,

00:23:50.720 --> 00:23:52.880
 some of the components that are included

00:23:52.880 --> 00:23:55.960
 include taking analysis of a service area,

00:23:55.960 --> 00:23:59.680
 then leading into land use assumptions related to growth,

00:23:59.680 --> 00:24:02.080
 then calculating service units,

00:24:02.080 --> 00:24:04.800
 as well as analyzing capital improvements plan

00:24:04.800 --> 00:24:07.640
 and identifying an impact fee capital improvements plan,

00:24:07.640 --> 00:24:10.920
 and finally concluding with an impact fee calculation.

00:24:10.920 --> 00:24:12.320
 For today's presentation,

00:24:12.320 --> 00:24:15.480
 we'll be focusing on the service areas alone.

00:24:15.480 --> 00:24:18.800
 Chapter 395's definition for an impact fee,

00:24:18.800 --> 00:24:21.640
 it is essentially a one-time fee for future development.

00:24:21.640 --> 00:24:25.600
 It is a mechanism to recover infrastructure costs

00:24:25.600 --> 00:24:28.120
 required to serve the future development.

00:24:28.120 --> 00:24:32.080
 From a general funding perspective,

00:24:32.080 --> 00:24:34.640
 impact fees is another mechanism

00:24:34.640 --> 00:24:37.520
 to recover costs related to infrastructure.

00:24:37.520 --> 00:24:39.200
 So you can have water and sewer rates,

00:24:39.200 --> 00:24:42.240
 private sector participation, and finally impact fees.

00:24:42.240 --> 00:24:46.360
 However, impact fees are associated with infrastructure

00:24:46.360 --> 00:24:48.360
 necessitated only by new growth,

00:24:48.360 --> 00:24:50.880
 and that's what it can be applied to.

00:24:50.880 --> 00:24:55.000
 So items that cannot be payable through impact fees.

00:24:55.000 --> 00:24:57.680
 What can be paid for through an impact fee program

00:24:57.680 --> 00:25:00.360
 include construction costs for the capital improvements plan

00:25:00.360 --> 00:25:02.160
 that's identified in the study,

00:25:02.160 --> 00:25:04.160
 and this can include, of course, on the roadway side,

00:25:04.160 --> 00:25:06.280
 any thoroughfare plans for water,

00:25:06.280 --> 00:25:09.680
 we're looking at up-sized water and wastewater lines,

00:25:09.680 --> 00:25:11.680
 as well as survey and engineering fees,

00:25:11.680 --> 00:25:14.280
 land acquisition costs, and even planning studies

00:25:14.280 --> 00:25:16.680
 such as the impact fee study itself.

00:25:16.680 --> 00:25:19.360
 What cannot be paid for through impact fees

00:25:19.360 --> 00:25:22.880
 are administrative costs such as staff time,

00:25:22.880 --> 00:25:25.400
 or if not, upgrades to serve existing development.

00:25:25.400 --> 00:25:27.760
 Once again, this is all related to new growth.

00:25:27.760 --> 00:25:32.680
 So benefits to developers when it comes to impact fees.

00:25:32.680 --> 00:25:34.720
 For one, it is equitable,

00:25:34.720 --> 00:25:38.040
 meaning barring existing ordinances that are in place,

00:25:38.040 --> 00:25:40.520
 the development itself pays an equal fee,

00:25:40.520 --> 00:25:44.200
 whether it's first to develop or last to develop.

00:25:44.200 --> 00:25:45.880
 It is also predictable.

00:25:45.880 --> 00:25:48.040
 The fee schedules are generally uploaded online,

00:25:48.040 --> 00:25:51.440
 so therefore, developers can also rely on the study itself

00:25:51.440 --> 00:25:55.680
 to make decisions about when, where, and what to build.

00:25:55.680 --> 00:25:57.880
 It also ensures the accountability.

00:25:57.880 --> 00:26:00.160
 State law requires that impact fees

00:26:00.160 --> 00:26:02.560
 are spent within a certain amount of time,

00:26:02.560 --> 00:26:04.480
 as well as, or if not, it will be refunded

00:26:04.480 --> 00:26:06.160
 to those property owners.

00:26:06.160 --> 00:26:07.800
 And it's also proportional.

00:26:07.800 --> 00:26:10.200
 It is directly related to the amount of demand

00:26:10.200 --> 00:26:13.280
 that's generated by that said development.

00:26:13.280 --> 00:26:18.000
 So the role of the Capital Improvements Advisory Committee

00:26:18.000 --> 00:26:21.120
 from Chapter 395 has a local government,

00:26:21.120 --> 00:26:24.480
 it's the local government code that requires the city

00:26:24.480 --> 00:26:27.280
 to establish the Capital Improvements Advisory Committee

00:26:27.280 --> 00:26:29.640
 when updating impact fees.

00:26:29.640 --> 00:26:31.680
 Since 2003, the city of Denton

00:26:31.680 --> 00:26:34.160
 has appointed the Planning and Zoning Commission

00:26:34.160 --> 00:26:37.040
 and one ad hoc member from the Extraterritorial,

00:26:37.040 --> 00:26:40.880
 if bless you, jurisdiction to serve as the CIAC.

00:26:40.880 --> 00:26:42.880
 So the Planning and Zoning Commission

00:26:42.880 --> 00:26:44.600
 may act as that advisory committee

00:26:44.600 --> 00:26:46.640
 if it meets these particular items.

00:26:46.640 --> 00:26:49.040
 So for one, the commission must include

00:26:49.040 --> 00:26:53.080
 at least one representative of the real estate development

00:26:53.080 --> 00:26:55.800
 or building industries who are not employees

00:26:55.800 --> 00:26:59.400
 of the political subdivision or the governmental entity,

00:26:59.400 --> 00:27:00.880
 as well as one representative

00:27:00.880 --> 00:27:04.000
 of the Extraterritorial jurisdiction, the ETJ.

00:27:04.000 --> 00:27:07.040
 So currently, the existing Planning and Zoning Commission

00:27:07.040 --> 00:27:09.160
 meets these requirements listed above,

00:27:09.160 --> 00:27:11.720
 except for one representative of the ETJ,

00:27:11.720 --> 00:27:13.720
 which we will discuss in our next steps.

00:27:13.720 --> 00:27:16.680
 So the Capital Improvements Advisory Committee

00:27:16.680 --> 00:27:20.680
 is tasked to review and provide comments to city council

00:27:20.680 --> 00:27:23.680
 and the public utility boards on the land use assumptions,

00:27:23.680 --> 00:27:25.400
 the Impact V Capital Improvements Plan,

00:27:25.400 --> 00:27:27.200
 as well as the impact fees.

00:27:27.200 --> 00:27:30.440
 And in between that time, during the future updates,

00:27:30.440 --> 00:27:33.720
 since the impact fee study is itself required by law

00:27:33.720 --> 00:27:36.640
 to be updated every five years, which is why we're here,

00:27:36.640 --> 00:27:40.840
 it is also tasked to monitor and evaluate the Impact VCIP,

00:27:40.840 --> 00:27:42.880
 as well as file semi-annual reports

00:27:42.880 --> 00:27:46.040
 and advise as needed on revisions.

00:27:46.040 --> 00:27:49.280
 Now, the Public Utilities Board, as well as the city council,

00:27:49.280 --> 00:27:51.720
 will then review the same documents

00:27:51.720 --> 00:27:53.600
 and also consider comments provided

00:27:53.600 --> 00:27:55.360
 by the advisory committee,

00:27:55.360 --> 00:27:57.320
 and finally consider any recommended updates

00:27:57.320 --> 00:27:59.680
 between those five-year updates in time.

00:27:59.680 --> 00:28:03.400
 So as part of our objective,

00:28:03.400 --> 00:28:05.000
 we're reviewing the service area breakdown,

00:28:05.000 --> 00:28:06.840
 and we're giving you a few updates.

00:28:06.840 --> 00:28:08.880
 A service area establishes the boundary

00:28:08.880 --> 00:28:11.840
 to which funds can be collected and specifies areas

00:28:11.840 --> 00:28:14.800
 to be served by the Impact VCIP.

00:28:14.800 --> 00:28:16.760
 Now, these funds are collected,

00:28:16.760 --> 00:28:20.000
 and they must be spent within that said service area

00:28:20.000 --> 00:28:21.760
 within 10 years.

00:28:21.760 --> 00:28:25.760
 In 2018, these are the existing service areas.

00:28:25.760 --> 00:28:28.320
 For wastewater, it's one single service area,

00:28:28.320 --> 00:28:30.560
 and for water, three separate service areas.

00:28:30.560 --> 00:28:33.880
 You had your inner city core area, the surrounding,

00:28:33.880 --> 00:28:35.320
 which is 1B, and then 2,

00:28:35.320 --> 00:28:38.280
 which is the southwest regional growth.

00:28:38.280 --> 00:28:41.560
 So updates that are coming through,

00:28:41.560 --> 00:28:43.600
 and we're gonna kind of walk through each of this.

00:28:43.600 --> 00:28:46.320
 Currently, what's shown here are the existing city limits,

00:28:46.320 --> 00:28:48.240
 as well as the existing ETJ.

00:28:48.240 --> 00:28:51.760
 What's shown here in black and black hatch mark

00:28:51.760 --> 00:28:54.600
 are the planned or probable developments

00:28:54.600 --> 00:28:57.280
 that are within the water CCN boundary,

00:28:57.280 --> 00:29:00.280
 as well as externally out towards the ETJ.

00:29:00.280 --> 00:29:04.240
 As part of the 2018 study,

00:29:04.240 --> 00:29:06.120
 you can see here that we have,

00:29:06.120 --> 00:29:08.920
 we're at least proposing to expand

00:29:08.920 --> 00:29:13.520
 for the 2020-2023 update out past the ETJ,

00:29:13.520 --> 00:29:16.080
 which chapter 395 does allow,

00:29:16.080 --> 00:29:18.560
 out to basically cover all the probable development

00:29:18.560 --> 00:29:19.880
 that will be coming in.

00:29:19.880 --> 00:29:22.400
 And so another component that we've been discussing

00:29:22.400 --> 00:29:25.120
 with staff, as far as even with capital projects

00:29:25.120 --> 00:29:26.520
 that will be coming in,

00:29:26.520 --> 00:29:30.440
 since water itself had three service areas,

00:29:30.440 --> 00:29:33.720
 we're proposing to both have the wastewater also equal,

00:29:33.720 --> 00:29:36.400
 mirror the water study as well,

00:29:36.400 --> 00:29:37.840
 in which both the water and wastewater

00:29:37.840 --> 00:29:40.120
 will have equal service areas, as shown here.

00:29:40.120 --> 00:29:42.640
 Yes.

00:29:42.640 --> 00:29:43.480
 Sorry.

00:29:43.480 --> 00:29:45.440
 - For me, it would be so much easier

00:29:45.440 --> 00:29:50.000
 if you would put the 2018 and the 2023 side by side.

00:29:50.000 --> 00:29:50.840
 - Absolutely.

00:29:50.840 --> 00:29:51.680
 - So that you could compare

00:29:51.680 --> 00:29:53.280
 because you're flipping back and forth,

00:29:53.280 --> 00:29:55.160
 trying to see the difference.

00:29:55.160 --> 00:29:56.000
 - Yeah.

00:29:56.000 --> 00:29:57.440
 - And it just be,

00:29:57.440 --> 00:30:00.600
 I would find it a lot easier,

00:30:00.600 --> 00:30:02.960
 I don't know if anyone else would, but I would.

00:30:02.960 --> 00:30:04.800
 - Yeah, would that be helpful?

00:30:04.800 --> 00:30:08.120
 - So on the--

00:30:08.120 --> 00:30:08.960
 - Go ahead.

00:30:08.960 --> 00:30:09.800
 - Yes.

00:30:12.760 --> 00:30:13.880
 So the wastewater,

00:30:13.880 --> 00:30:17.120
 I'm sorry, what are they, regions?

00:30:17.120 --> 00:30:17.960
 - Service areas.

00:30:17.960 --> 00:30:18.920
 - Service areas, okay.

00:30:18.920 --> 00:30:20.120
 So the wastewater service areas,

00:30:20.120 --> 00:30:22.860
 you've aligned them with the water service areas.

00:30:22.860 --> 00:30:25.920
 However, there will be different infrastructure

00:30:25.920 --> 00:30:28.320
 providing services to each of these zones.

00:30:28.320 --> 00:30:29.160
 - Correct.

00:30:29.160 --> 00:30:32.160
 - And I wonder if it wouldn't be more appropriate

00:30:32.160 --> 00:30:36.720
 to align that region two, zone two, excuse me,

00:30:36.720 --> 00:30:41.720
 with the Hickory Creek wastewater service area.

00:30:43.280 --> 00:30:46.240
 So that we don't have a development,

00:30:46.240 --> 00:30:49.320
 like there are all these little blue fingers of 1B

00:30:49.320 --> 00:30:51.960
 that reach down into the Hickory Creek watershed.

00:30:51.960 --> 00:30:55.840
 And those will be provided sewer service

00:30:55.840 --> 00:30:58.720
 by the future Hickory Creek infrastructure.

00:30:58.720 --> 00:31:00.480
 But they will be paying a fee

00:31:00.480 --> 00:31:05.140
 based on the Pecan Creek kind of service zone.

00:31:05.140 --> 00:31:08.120
 So I just think it might make more sense.

00:31:08.120 --> 00:31:11.380
 And I appreciate aligning water and wastewater,

00:31:11.380 --> 00:31:14.800
 but there really might be differences in incurred costs

00:31:14.800 --> 00:31:16.960
 based on the future infrastructure

00:31:16.960 --> 00:31:20.860
 for wastewater versus water.

00:31:20.860 --> 00:31:22.320
 - Yeah, so part of the study,

00:31:22.320 --> 00:31:25.960
 we do look at each of the capital projects that are proposed.

00:31:25.960 --> 00:31:27.160
 And if they do happen to cross, say,

00:31:27.160 --> 00:31:28.720
 two separate service areas,

00:31:28.720 --> 00:31:30.640
 there will be proportional percentages applied

00:31:30.640 --> 00:31:32.440
 to each one of those capital projects

00:31:32.440 --> 00:31:34.240
 to cover, say, if it were to be split

00:31:34.240 --> 00:31:37.200
 between service areas two, as well as 1B.

00:31:37.200 --> 00:31:40.360
 And that will be part of the analysis to confirm that.

00:31:40.360 --> 00:31:42.600
 - Right, I don't mean pieces of property

00:31:42.600 --> 00:31:43.420
 that cross the line.

00:31:43.420 --> 00:31:47.640
 I'm saying that it appears on this map

00:31:47.640 --> 00:31:51.920
 that there's an area near I-35W,

00:31:51.920 --> 00:31:55.340
 where the small blue section of 1B reaches down

00:31:55.340 --> 00:31:57.200
 into section two.

00:31:57.200 --> 00:32:00.000
 And that appears to be south of Hickory Creek.

00:32:00.000 --> 00:32:04.060
 So it will definitely be on the Hickory Creek sewer system.

00:32:04.060 --> 00:32:10.080
 But it's in the kind of Pecan Creek zone

00:32:11.120 --> 00:32:15.200
 so just, if we know that this certain corridor

00:32:15.200 --> 00:32:17.000
 is going to be provided services

00:32:17.000 --> 00:32:20.440
 by a large future capital project,

00:32:20.440 --> 00:32:23.200
 we might want to go ahead and align those zones now.

00:32:23.200 --> 00:32:26.720
 - Absolutely, and I believe John also wants to mention

00:32:26.720 --> 00:32:27.560
 some of the things.

00:32:27.560 --> 00:32:29.840
 (man speaking off mic)

00:32:29.840 --> 00:32:31.360
 Yeah, yes.

00:32:31.360 --> 00:32:32.200
 Come on through.

00:32:32.200 --> 00:32:40.280
 - First of all, you're making a very good point.

00:32:40.280 --> 00:32:41.640
 That's one thing that's unique

00:32:41.640 --> 00:32:44.440
 about wastewater infrastructure as compared to the water.

00:32:44.440 --> 00:32:47.160
 It is kind of basin-specific

00:32:47.160 --> 00:32:48.860
 as far as the infrastructure needs.

00:32:48.860 --> 00:32:51.280
 It's a discussion.

00:32:51.280 --> 00:32:53.920
 If you're making a very good suggestion,

00:32:53.920 --> 00:32:55.640
 I think we can take that back down,

00:32:55.640 --> 00:32:57.280
 to take that to city staff

00:32:57.280 --> 00:32:59.160
 and see if that is a suggestion

00:32:59.160 --> 00:33:02.000
 that they want to consider as far as the adjustments.

00:33:02.000 --> 00:33:04.920
 This is one proposal to just make water and sewer

00:33:04.920 --> 00:33:06.440
 consistent with each other

00:33:06.440 --> 00:33:08.960
 as compared to what was in the past.

00:33:08.960 --> 00:33:11.760
 So, if there needs to be further discussion

00:33:11.760 --> 00:33:13.260
 about what makes the most sense

00:33:13.260 --> 00:33:16.680
 as far as the significant amount of infrastructure,

00:33:16.680 --> 00:33:19.320
 you're right, if you think about south,

00:33:19.320 --> 00:33:22.100
 sorry, I won't step away, I'll just point here.

00:33:22.100 --> 00:33:25.840
 You're right, if you think about the area south,

00:33:25.840 --> 00:33:27.640
 just like the point you were making,

00:33:27.640 --> 00:33:32.840
 south of I-35, that's not in service area two,

00:33:32.840 --> 00:33:34.680
 but is in service area 1B,

00:33:34.680 --> 00:33:36.960
 that is in the Hickory Creek Basin,

00:33:36.960 --> 00:33:39.560
 you are talking about infrastructure

00:33:39.560 --> 00:33:41.540
 within the Hickory Creek Basin

00:33:41.540 --> 00:33:44.880
 that actually toggles between two.

00:33:44.880 --> 00:33:48.120
 And we know that a big portion of the infrastructure

00:33:48.120 --> 00:33:51.000
 from a growth perspective is related to the areas

00:33:51.000 --> 00:33:53.000
 you kind of see here in two, but also relate.

00:33:53.000 --> 00:33:56.640
 So, it is somewhat complicated, I guess,

00:33:56.640 --> 00:34:01.640
 if you could say, and we're taking that into account

00:34:01.640 --> 00:34:03.880
 with the basin boundaries you see here,

00:34:03.880 --> 00:34:06.540
 or the service area boundaries you see here.

00:34:06.540 --> 00:34:09.280
 But I think it's just, we hear you,

00:34:09.280 --> 00:34:11.940
 we take your comment under advisement,

00:34:11.940 --> 00:34:14.200
 and then I think we just go back to city staff

00:34:14.200 --> 00:34:15.500
 and talk to them about that,

00:34:15.500 --> 00:34:18.720
 and see if that's something they should bring forward.

00:34:18.720 --> 00:34:19.860
 - Thank you.

00:34:19.860 --> 00:34:21.960
 - Excellent, thank you, John.

00:34:21.960 --> 00:34:24.240
 - Awesome, real quick. - Thank you, absolutely.

00:34:24.240 --> 00:34:26.700
 - To Ms. Rosso's question, is it true

00:34:26.700 --> 00:34:31.120
 that the dotted line around is the 2018 boundary?

00:34:31.120 --> 00:34:33.240
 - So-- - Looking at the other map,

00:34:33.240 --> 00:34:35.080
 it looks like that, yes. - Yes, let me,

00:34:35.080 --> 00:34:38.560
 I'm gonna back up for a second, right over here.

00:34:38.560 --> 00:34:40.560
 So, what we're seeing here for 2018,

00:34:40.560 --> 00:34:43.380
 we took into account the CCN boundary,

00:34:43.380 --> 00:34:48.120
 and that did develop part of the impact fee service area.

00:34:48.120 --> 00:34:52.900
 There are portions that are outside of the CCNs themselves,

00:34:52.900 --> 00:34:54.320
 but that was considered as part of the study,

00:34:54.320 --> 00:34:58.160
 since Chapter 395 does allow us to go out towards the ETJ.

00:34:58.160 --> 00:35:00.880
 But for the most part, yes it does.

00:35:03.420 --> 00:35:06.680
 - All right, are there any more questions between that

00:35:06.680 --> 00:35:08.800
 and the proposed service area for 2022?

00:35:08.800 --> 00:35:14.320
 All right, we're gonna go ahead and continue.

00:35:14.320 --> 00:35:16.040
 So, some of the next steps.

00:35:16.040 --> 00:35:17.960
 We will also be presenting the same presentation.

00:35:17.960 --> 00:35:19.480
 We will take into account, of course,

00:35:19.480 --> 00:35:21.960
 we'll make that address, and we'll discuss that.

00:35:21.960 --> 00:35:25.280
 We'll also show the 2018 and 2022 proposed updates

00:35:25.280 --> 00:35:28.280
 side by side for the potential developer town hall meeting

00:35:28.280 --> 00:35:31.680
 that's coming up this Thursday that we'll be attending.

00:35:31.680 --> 00:35:36.240
 And then related through spring and fall 2023,

00:35:36.240 --> 00:35:39.200
 we will be coming forward to establish

00:35:39.200 --> 00:35:40.680
 the capital improvements advisory committee

00:35:40.680 --> 00:35:44.120
 that adopts the ordinance to identify the ad hoc ETJ member,

00:35:44.120 --> 00:35:47.360
 as well as come forward with the advisory committee meetings

00:35:47.360 --> 00:35:49.480
 to then, of course, receive some of their comments

00:35:49.480 --> 00:35:50.680
 and feedback.

00:35:50.680 --> 00:35:53.460
 We'll be also meeting again related

00:35:53.460 --> 00:35:54.920
 to the actual adoption process,

00:35:54.920 --> 00:35:57.320
 once we have all of our analysis completed

00:35:57.320 --> 00:35:58.800
 with the public utilities board,

00:35:58.800 --> 00:36:02.640
 and then, finally, complete the entire study process

00:36:02.640 --> 00:36:05.360
 and adopt through the city council meetings.

00:36:05.360 --> 00:36:07.920
 So, with that, are there any additional questions

00:36:07.920 --> 00:36:09.740
 related to these proposed updates?

00:36:09.740 --> 00:36:11.720
 - Go ahead.

00:36:11.720 --> 00:36:12.540
 - Yes.

00:36:12.540 --> 00:36:15.160
 - What's the date of the developer town hall meeting?

00:36:15.160 --> 00:36:16.160
 - This Thursday?

00:36:16.160 --> 00:36:19.520
 From 10 a.m.?

00:36:19.520 --> 00:36:22.120
 - 10 to 11. - 10 to 11 a.m.

00:36:22.120 --> 00:36:24.720
 - At the Development Services Center.

00:36:24.720 --> 00:36:27.600
 So, it's this Thursday from 10 to 11

00:36:27.600 --> 00:36:29.400
 at the Development Services Center,

00:36:29.400 --> 00:36:31.240
 if you want to attend that meeting.

00:36:31.240 --> 00:36:33.040
 - Yeah, can anyone attend those?

00:36:33.040 --> 00:36:35.160
 - Yeah, I think everybody's welcome to attend.

00:36:35.160 --> 00:36:37.360
 If you want to attend, we welcome you there,

00:36:37.360 --> 00:36:39.660
 anybody, or the entire board, if you'd like to.

00:36:39.660 --> 00:36:40.880
 Well, actually, if the entire board come,

00:36:40.880 --> 00:36:42.340
 I guess it may be a quorum, but--

00:36:42.340 --> 00:36:43.680
 (laughing)

00:36:43.680 --> 00:36:46.800
 Ms. Russell, you can attend the meeting, absolutely, yeah.

00:36:46.800 --> 00:36:50.740
 - Okay, is that the one off Mingo?

00:36:50.740 --> 00:36:52.640
 - It's actually just right down here.

00:36:52.640 --> 00:36:54.640
 I don't know exactly what the address is, but--

00:36:54.640 --> 00:36:55.800
 - 401 North Elm.

00:36:55.800 --> 00:36:57.360
 - 401 North Elm.

00:36:57.360 --> 00:36:59.440
 Is the address, the brand new building

00:36:59.440 --> 00:37:00.960
 we constructed a couple years ago.

00:37:00.960 --> 00:37:02.440
 - The old Kroger.

00:37:02.440 --> 00:37:03.840
 - Yes. (laughing)

00:37:03.840 --> 00:37:06.840
 - Right, well, safely before that.

00:37:06.840 --> 00:37:09.280
 - Mr. Taylor, oh. (laughing)

00:37:09.280 --> 00:37:10.880
 Mr. Taylor has another question.

00:37:10.880 --> 00:37:14.080
 - Thank you, yeah, I really, this is more of a comment,

00:37:14.080 --> 00:37:19.080
 I previously served on PNZ two impact fee updates ago,

00:37:19.080 --> 00:37:24.160
 and I understand that we are more recipients of the process,

00:37:24.160 --> 00:37:26.480
 we're a smaller approval in the chain

00:37:26.480 --> 00:37:29.640
 than I think PNZ kind of has the leading role there,

00:37:29.640 --> 00:37:33.760
 and as always comes up, this impact fees

00:37:33.760 --> 00:37:38.400
 are really important to be fair to new development

00:37:38.400 --> 00:37:40.560
 and to existing residents.

00:37:40.560 --> 00:37:43.760
 Any infrastructure not paid for by impact fees

00:37:43.760 --> 00:37:47.000
 gets paid for by the existing tax base,

00:37:47.000 --> 00:37:49.080
 and we don't want to overcharge

00:37:49.080 --> 00:37:54.080
 or create unnecessarily hurdles for new neighborhoods,

00:37:55.160 --> 00:37:59.280
 but we also don't want to have existing neighborhoods

00:37:59.280 --> 00:38:03.320
 bear the burden of new development.

00:38:03.320 --> 00:38:06.800
 And so that's where I think if we can align the region

00:38:06.800 --> 00:38:11.120
 of the zones and the fees based on what infrastructure

00:38:11.120 --> 00:38:14.480
 they will use, that just creates greater fairness

00:38:14.480 --> 00:38:17.600
 for existing rate payers and for future developments.

00:38:17.600 --> 00:38:19.980
 You might have, well, I'm gonna be using

00:38:19.980 --> 00:38:22.440
 Hickory Creek water treatment plant that doesn't exist yet,

00:38:22.440 --> 00:38:25.400
 but I can pay the lower fee over here

00:38:25.400 --> 00:38:26.720
 'cause I'm on this side of the street

00:38:26.720 --> 00:38:30.040
 versus that development, that farm over there developing,

00:38:30.040 --> 00:38:31.120
 you know, might have a higher fee.

00:38:31.120 --> 00:38:33.680
 So I just wanna-- - Good point.

00:38:33.680 --> 00:38:37.680
 - As much for members of this board as for staff,

00:38:37.680 --> 00:38:40.760
 I'm sure is already aware and our consultants,

00:38:40.760 --> 00:38:42.920
 that we wanna make this process as fair as possible

00:38:42.920 --> 00:38:47.460
 to all development and all existing residents.

00:38:47.460 --> 00:38:50.120
 - Goodbye. - Yeah.

00:38:50.120 --> 00:38:52.440
 - Mr. Taylor, that's a great point.

00:38:52.440 --> 00:38:54.920
 At these future conversations that are noted on this slide,

00:38:54.920 --> 00:38:56.440
 that's the very conversation we can have

00:38:56.440 --> 00:38:58.880
 with the Public Utility Board and City Council.

00:38:58.880 --> 00:39:02.640
 In 2018, the City Council elected to adopt the max fee

00:39:02.640 --> 00:39:04.280
 or the full recovery fee.

00:39:04.280 --> 00:39:05.740
 That's currently what's in place now.

00:39:05.740 --> 00:39:08.160
 So as we continue the study and we work through it

00:39:08.160 --> 00:39:10.920
 and actually calculate the fee per SFE,

00:39:10.920 --> 00:39:12.160
 that we can have those conversations

00:39:12.160 --> 00:39:13.640
 that you're talking about, absolutely.

00:39:13.640 --> 00:39:14.960
 But the purpose of the study is to make sure

00:39:14.960 --> 00:39:16.560
 that it's fair across the city.

00:39:16.560 --> 00:39:21.020
 - Okay, other questions, Mr. Ryback.

00:39:21.020 --> 00:39:23.540
 - I don't have a question, but I do have a comment.

00:39:23.540 --> 00:39:26.560
 I wonder if it might be advisable for us to consider

00:39:26.560 --> 00:39:30.320
 once there is a Capital Improvement Advisory Committee,

00:39:30.320 --> 00:39:34.040
 some joint meetings between the PUB and CIAC.

00:39:34.040 --> 00:39:37.200
 That way, these things wouldn't be coming to us cold,

00:39:37.200 --> 00:39:39.200
 if you will, from the Advisory Committee.

00:39:39.200 --> 00:39:42.760
 So it might be something worth considering for the future.

00:39:42.760 --> 00:39:44.680
 - We can go ahead and take a look at that.

00:39:44.680 --> 00:39:48.000
 And if that's something we can do, we'll try to set it up.

00:39:48.000 --> 00:39:49.800
 - Yeah, I'm not suggesting we do it every time

00:39:49.800 --> 00:39:52.000
 they have a meeting, but it might be quarterly

00:39:52.000 --> 00:39:53.360
 or twice a year or something.

00:39:53.360 --> 00:39:54.480
 We can kind of catch up with what they're--

00:39:54.480 --> 00:39:55.560
 - Some check-in points.

00:39:55.560 --> 00:39:56.680
 - Yes, ma'am.

00:39:56.680 --> 00:39:58.520
 And I want to compliment you, Mr. Taylor,

00:39:58.520 --> 00:40:00.280
 on your questions, 'cause I had the same one

00:40:00.280 --> 00:40:04.400
 about that remote area that was separated from the rest.

00:40:04.400 --> 00:40:05.240
 So thank you.

00:40:05.240 --> 00:40:06.400
 - Absolutely.

00:40:06.400 --> 00:40:09.320
 All right, but not, thank you.

00:40:09.320 --> 00:40:10.540
 - Thank you.

00:40:10.540 --> 00:40:13.000
 All right, next we have receive a report,

00:40:13.000 --> 00:40:15.560
 hold a discussion, and provide suggestions

00:40:15.560 --> 00:40:17.300
 or recommendations regarding updates

00:40:17.300 --> 00:40:19.860
 to the City of Denton criteria manuals.

00:40:19.860 --> 00:40:36.720
 - Good morning, everybody.

00:40:36.720 --> 00:40:39.840
 Thank you for allowing me to come and present to you.

00:40:39.840 --> 00:40:40.920
 My name is Brett Bourgeois.

00:40:40.920 --> 00:40:43.280
 I am the Deputy City Engineer in the Capital Projects

00:40:43.280 --> 00:40:44.440
 Engineering Department.

00:40:44.440 --> 00:40:48.480
 And I'm here today to talk about our criteria manual updates.

00:40:48.480 --> 00:40:52.280
 The agenda is we're gonna go through our public outreach

00:40:52.280 --> 00:40:55.920
 plan that we have for this, including today's meeting,

00:40:55.920 --> 00:40:57.560
 background about the criteria manual

00:40:57.560 --> 00:40:59.960
 and the process that we went through this year,

00:40:59.960 --> 00:41:02.400
 run through some of the high-level updates

00:41:02.400 --> 00:41:04.240
 that we've had for the criteria manuals this year,

00:41:04.240 --> 00:41:06.400
 and then what our next steps are going forward.

00:41:06.400 --> 00:41:08.760
 I also have an attendance of technical experts

00:41:08.760 --> 00:41:11.640
 from every department and discipline

00:41:11.640 --> 00:41:12.800
 related to the criteria manual

00:41:12.800 --> 00:41:14.840
 for any detailed questions you may have.

00:41:14.840 --> 00:41:17.760
 So for our public outreach plan, as you can see,

00:41:17.760 --> 00:41:20.100
 we have a pretty extensive program in place.

00:41:20.100 --> 00:41:22.080
 We went to a planning and zoning commission

00:41:22.080 --> 00:41:23.400
 earlier this month.

00:41:23.400 --> 00:41:27.480
 We had a developer town hall as well a couple weeks ago.

00:41:27.480 --> 00:41:29.720
 We updated the criteria manuals online,

00:41:29.720 --> 00:41:32.400
 posted draft versions of them with the feedback form

00:41:32.400 --> 00:41:35.080
 for the community and the public to comment on.

00:41:35.080 --> 00:41:37.800
 We updated the city council via Friday report item,

00:41:37.800 --> 00:41:40.840
 and now we're here, basically in the middle of the process,

00:41:40.840 --> 00:41:42.560
 laying out our updates to you guys

00:41:42.560 --> 00:41:44.680
 and for your comments and feedback.

00:41:44.680 --> 00:41:46.920
 We also have several other meetings planned

00:41:46.920 --> 00:41:49.960
 to present to the Engineering Society,

00:41:49.960 --> 00:41:51.600
 do a further update to city council

00:41:51.600 --> 00:41:53.640
 after we receive comments from the public,

00:41:53.640 --> 00:41:55.360
 and then eventually bring this forward

00:41:55.360 --> 00:41:56.880
 to city council for adoption

00:41:56.880 --> 00:41:59.280
 and effective date of January 1st.

00:41:59.280 --> 00:42:02.980
 So a little bit of background on what we did.

00:42:02.980 --> 00:42:07.000
 Our criteria manuals are, it's a big process.

00:42:07.000 --> 00:42:09.180
 So we have a lot of different disciplines.

00:42:09.180 --> 00:42:10.760
 They cover different areas.

00:42:10.760 --> 00:42:13.360
 We started staff review of these documents

00:42:13.360 --> 00:42:15.820
 in April of last year, or of this year.

00:42:15.820 --> 00:42:19.800
 We met once a week, every Thursday from 10 a.m. to 12 p.m.

00:42:19.800 --> 00:42:22.500
 We had representatives, every department arrive.

00:42:22.500 --> 00:42:24.280
 We met from April all the way through July,

00:42:24.280 --> 00:42:26.560
 going through every criteria manual, every discipline,

00:42:26.560 --> 00:42:30.200
 every line by line to look at where we are.

00:42:30.200 --> 00:42:34.160
 We're now going out to do comments to the public

00:42:34.160 --> 00:42:35.960
 with what our recommendations are.

00:42:35.960 --> 00:42:37.000
 We're gonna make these updates.

00:42:37.000 --> 00:42:38.600
 We're gonna inform everybody

00:42:38.600 --> 00:42:40.280
 and bring it back for the council.

00:42:40.280 --> 00:42:41.720
 And one of the things that we realized

00:42:41.720 --> 00:42:43.560
 by going through these updates

00:42:43.560 --> 00:42:46.560
 is that we have four different criteria manuals,

00:42:46.560 --> 00:42:48.640
 which is not consistent with what we have

00:42:48.640 --> 00:42:52.520
 for our development code, where we have one code document.

00:42:52.520 --> 00:42:55.560
 And all of our criteria manuals are formatted differently.

00:42:55.560 --> 00:42:57.400
 It's a little bit structured differently.

00:42:57.400 --> 00:42:59.100
 And we have information that's repeated

00:42:59.100 --> 00:43:01.600
 across multiple manuals, and we have to keep that consistent

00:43:01.600 --> 00:43:02.940
 as we make changes.

00:43:02.940 --> 00:43:05.320
 So one of our future goals is to combine

00:43:05.320 --> 00:43:07.600
 all these manuals into one document

00:43:07.600 --> 00:43:10.360
 with different chapters and have the consistent information

00:43:10.360 --> 00:43:13.080
 in one place, be consistent with the development code,

00:43:13.080 --> 00:43:15.320
 and eliminate all the conflicts we have.

00:43:15.320 --> 00:43:16.600
 - Mr. Beck. - Thank you, Chair.

00:43:16.600 --> 00:43:18.920
 How do you break down those four criteria manuals?

00:43:18.920 --> 00:43:21.880
 You got subdivision development, streets,

00:43:21.880 --> 00:43:22.800
 how is that broken down?

00:43:22.800 --> 00:43:25.600
 - Actually, it's broken down on transportation-related topics

00:43:25.600 --> 00:43:27.560
 with the Transportation Criteria Manual.

00:43:27.560 --> 00:43:29.680
 We have a Water Wastewater Criteria Manual.

00:43:29.680 --> 00:43:32.400
 We have a Solid Waste Criteria Manual.

00:43:32.400 --> 00:43:35.240
 And then we also have a Storm Drain,

00:43:35.240 --> 00:43:36.920
 and Drain and Trigger Criteria Manual.

00:43:36.920 --> 00:43:37.840
 - Okay, thanks.

00:43:37.840 --> 00:43:44.840
 - So a little bit of guidance or background

00:43:44.840 --> 00:43:47.720
 on the governing documents of the city.

00:43:47.720 --> 00:43:49.380
 We have the Denton Development Code,

00:43:49.380 --> 00:43:51.060
 which sets the policy and the procedures

00:43:51.060 --> 00:43:52.440
 for all the developments.

00:43:52.440 --> 00:43:56.040
 That's basically the city's roadmap.

00:43:56.040 --> 00:43:58.380
 But the criteria manuals outline the technical

00:43:58.380 --> 00:44:01.040
 and the design criteria for these developments,

00:44:01.040 --> 00:44:02.520
 for these projects, for everything

00:44:02.520 --> 00:44:03.760
 that's being built within the city.

00:44:03.760 --> 00:44:06.120
 So we're making sure we're getting the right types of pipe,

00:44:06.120 --> 00:44:07.800
 we're having the right roadway sections,

00:44:07.800 --> 00:44:10.680
 we're having everything that we need

00:44:10.680 --> 00:44:12.640
 the way that we need it for the city.

00:44:12.640 --> 00:44:14.640
 Then we also have our standard details

00:44:14.640 --> 00:44:16.600
 and our construction specifications.

00:44:16.600 --> 00:44:18.480
 That outlines how to actually build it,

00:44:18.480 --> 00:44:19.720
 and then drawings of what it's supposed

00:44:19.720 --> 00:44:21.060
 to look like in the field.

00:44:21.060 --> 00:44:25.120
 And again, this is kind of another breakdown of it.

00:44:25.120 --> 00:44:27.640
 The Denton Development Code is overriding document,

00:44:27.640 --> 00:44:29.080
 guidance document.

00:44:29.080 --> 00:44:31.160
 Criteria manuals set the design requirements

00:44:31.160 --> 00:44:32.640
 for those documents.

00:44:32.640 --> 00:44:34.320
 The specifications of how you build it,

00:44:34.320 --> 00:44:35.960
 and then the standard details showing

00:44:35.960 --> 00:44:37.760
 what it's supposed to look like out in the field

00:44:37.760 --> 00:44:38.960
 to actually construct it.

00:44:38.960 --> 00:44:42.480
 So going into a little bit of the updates,

00:44:42.480 --> 00:44:44.080
 the solid waste criteria manual

00:44:44.080 --> 00:44:46.640
 actually has a complete rewrite done last year

00:44:46.640 --> 00:44:48.200
 as part of the update.

00:44:48.200 --> 00:44:51.080
 The previous version of it I believe was completed in 2008,

00:44:51.080 --> 00:44:54.280
 so it needed a pretty good revision, overhaul of it.

00:44:54.280 --> 00:44:58.280
 So this year, because we had a full rewrite of it last year,

00:44:58.280 --> 00:45:00.200
 had very minor updates to it.

00:45:00.200 --> 00:45:04.520
 One of the things that they took out from the 2008 update

00:45:04.520 --> 00:45:07.920
 to the 2021 update was they removed the opening paragraph,

00:45:07.920 --> 00:45:10.480
 which outlined that the city was the sole provider

00:45:10.480 --> 00:45:13.780
 of all solid waste and recycling in the city of Denton,

00:45:13.780 --> 00:45:16.080
 including construction activities.

00:45:16.080 --> 00:45:18.760
 And so they actually had questions about that,

00:45:18.760 --> 00:45:21.320
 so we added that opening paragraph back into this document

00:45:21.320 --> 00:45:25.160
 to make it clear that everything for solid waste

00:45:25.160 --> 00:45:27.120
 needs to go through the city of Denton.

00:45:27.120 --> 00:45:32.020
 As well as that, there's different enclosure requirements

00:45:32.020 --> 00:45:35.800
 for different types of dwellings, multifamily dwellings,

00:45:35.800 --> 00:45:37.640
 and it gives a couple of options for them.

00:45:37.640 --> 00:45:39.080
 And one of the ones they wanted to add

00:45:39.080 --> 00:45:43.320
 was add an additional roll-off compactor enclosure

00:45:43.320 --> 00:45:46.160
 as an option for one of the larger multifamilies.

00:45:46.160 --> 00:45:49.920
 That way, it gives more variety for them.

00:45:49.920 --> 00:45:54.400
 And then we also revised the minimum alley width.

00:45:54.400 --> 00:45:57.280
 And we actually reduced it down to 15 feet.

00:45:57.280 --> 00:46:00.680
 We're still requiring the 20 feet of right-of-way dedication,

00:46:00.680 --> 00:46:03.720
 but we reduced the minimum pavement section down to 15 feet

00:46:03.720 --> 00:46:05.600
 because that gives us space to actually go in

00:46:05.600 --> 00:46:07.920
 and do maintenance or replace the alleyway.

00:46:07.920 --> 00:46:09.360
 If you have a 20-foot alleyway,

00:46:09.360 --> 00:46:11.700
 paved section with a 20-foot right-of-way,

00:46:11.700 --> 00:46:13.520
 you have no room to actually do any work.

00:46:13.520 --> 00:46:15.200
 You're up against the boundaries

00:46:15.200 --> 00:46:16.200
 where your right-of-way limits are.

00:46:16.200 --> 00:46:17.800
 You have to get temporary access easements

00:46:17.800 --> 00:46:19.360
 and it makes it a lot more difficult.

00:46:19.360 --> 00:46:20.760
 So we actually reduced that down,

00:46:20.760 --> 00:46:23.960
 and that's consistent with our transportation criteria manual.

00:46:25.400 --> 00:46:26.760
 - Mr. Taylor, yes.

00:46:26.760 --> 00:46:33.600
 - So I had heard that the City of Denton

00:46:33.600 --> 00:46:37.600
 is the sole solid waste provider for years.

00:46:37.600 --> 00:46:41.680
 And I do see these usually construction roll-off dumpsters

00:46:41.680 --> 00:46:44.960
 that are branded yellow and black or red and white.

00:46:44.960 --> 00:46:50.080
 Is there any kind of enforcement mechanism to that rule?

00:46:50.080 --> 00:46:53.440
 - We actually have a representative from the solid waste here

00:46:53.440 --> 00:46:54.640
 to answer your question.

00:46:54.640 --> 00:47:01.600
 - Good morning.

00:47:01.600 --> 00:47:03.680
 I'm Adrian Hill, Operations Manager

00:47:03.680 --> 00:47:06.080
 for the Solid Waste and Recycling Department.

00:47:06.080 --> 00:47:07.840
 Actually, we're working on Chapter 24

00:47:07.840 --> 00:47:09.760
 to update that process.

00:47:09.760 --> 00:47:11.960
 Right now, there's nothing we can enforce

00:47:11.960 --> 00:47:14.080
 an outside vendor coming in,

00:47:14.080 --> 00:47:15.400
 but we're in the process of,

00:47:15.400 --> 00:47:17.880
 I think it starts here with having that wording

00:47:17.880 --> 00:47:19.520
 in our site criteria manual.

00:47:19.520 --> 00:47:24.280
 - So Chapter 24, is that part of the solid waste guide?

00:47:24.280 --> 00:47:26.400
 - It's not part of the criteria manual at all.

00:47:26.400 --> 00:47:28.280
 - Okay, okay.

00:47:28.280 --> 00:47:31.280
 Yeah, like I said, I've heard that for a decade or more

00:47:31.280 --> 00:47:35.240
 and see these branded dumpsters and stuff like that.

00:47:35.240 --> 00:47:37.480
 So I was always curious,

00:47:37.480 --> 00:47:39.880
 why aren't they getting, I don't know,

00:47:39.880 --> 00:47:42.040
 worn or sited or something? - We're in that process.

00:47:42.040 --> 00:47:43.480
 - Okay, thank you. - Thank you.

00:47:43.480 --> 00:47:45.600
 - Question?

00:47:45.600 --> 00:47:47.520
 Yeah, oh, Barbara, oh, you didn't.

00:47:48.960 --> 00:47:53.120
 What do you do for areas that there is not a,

00:47:53.120 --> 00:47:57.640
 that they weren't required to have a dumpster enclosed?

00:47:57.640 --> 00:47:58.800
 - In the past?

00:47:58.800 --> 00:48:03.800
 - Yes, and now they decide to make a change.

00:48:03.800 --> 00:48:08.080
 You require them to put an enclosure,

00:48:08.080 --> 00:48:10.160
 but there's no room for an enclosure.

00:48:10.160 --> 00:48:11.280
 How do you handle that?

00:48:11.280 --> 00:48:13.560
 - So in the site criteria manual,

00:48:13.560 --> 00:48:16.960
 it states that anything that's 50% or greater

00:48:16.960 --> 00:48:19.160
 of the existing square footage of the building,

00:48:19.160 --> 00:48:20.520
 they'll have to redesign it

00:48:20.520 --> 00:48:22.840
 where they have to include an enclosure.

00:48:22.840 --> 00:48:24.680
 But everything that's done in the past,

00:48:24.680 --> 00:48:28.920
 if there's not any remodeling done 50% or more,

00:48:28.920 --> 00:48:30.240
 they keep what they have.

00:48:30.240 --> 00:48:31.760
 - So it'll be grandfathered? - Correct.

00:48:31.760 --> 00:48:33.080
 - Yeah, okay. - Yeah.

00:48:33.080 --> 00:48:39.640
 - Oh, I'm gonna ask, go ahead, Barbara.

00:48:39.640 --> 00:48:42.320
 I have one more question, so you go first.

00:48:42.320 --> 00:48:44.720
 - I was thinking about paved alleys.

00:48:44.720 --> 00:48:48.160
 There are areas in Denton that they used to use

00:48:48.160 --> 00:48:51.160
 to collect the trash coming down the alleys,

00:48:51.160 --> 00:48:54.600
 and then they decided they wouldn't do that anymore.

00:48:54.600 --> 00:48:56.280
 They go down the streets.

00:48:56.280 --> 00:48:57.760
 But the alleys are still there.

00:48:57.760 --> 00:49:01.000
 Who's responsible for taking care of those?

00:49:01.000 --> 00:49:04.240
 - Go ahead. - Yeah.

00:49:04.240 --> 00:49:07.160
 - So the alleyways is actually a pretty complicated topic,

00:49:07.160 --> 00:49:09.480
 and mainly it's because there's private alleys,

00:49:09.480 --> 00:49:11.080
 and then there's public alleys.

00:49:11.080 --> 00:49:13.200
 So it depends on the development of the location

00:49:13.200 --> 00:49:15.600
 in terms of who's supposed to maintain those.

00:49:15.600 --> 00:49:18.200
 And that's something that's a bigger conversation

00:49:18.200 --> 00:49:20.680
 that is an ongoing one with the new development

00:49:20.680 --> 00:49:21.600
 in the coal ranch area,

00:49:21.600 --> 00:49:24.440
 because they are wanting to put alleyways in there as well.

00:49:24.440 --> 00:49:26.760
 So it's a city-wide conversation

00:49:26.760 --> 00:49:28.200
 that we're having on that right now.

00:49:28.200 --> 00:49:31.120
 - Yeah, because if the city was using them,

00:49:31.120 --> 00:49:32.160
 and then they're not.

00:49:32.160 --> 00:49:35.520
 - Yeah, and that's basically the conversation

00:49:35.520 --> 00:49:38.960
 is that a lot of the private developments put alleyways in,

00:49:38.960 --> 00:49:41.280
 and they're identified as a private street.

00:49:41.280 --> 00:49:43.240
 So they're not designed and constructed necessarily

00:49:43.240 --> 00:49:44.880
 to the city standard.

00:49:44.880 --> 00:49:47.320
 At the same time, we have heavy vehicles,

00:49:47.320 --> 00:49:48.960
 service vehicles driving on those alleyways,

00:49:48.960 --> 00:49:51.280
 which are the ones causing the most wear and tear.

00:49:51.280 --> 00:49:53.760
 So then is it the city's responsibility to maintain those

00:49:53.760 --> 00:49:55.800
 and replace those, and if that's the case,

00:49:55.800 --> 00:49:58.880
 the city now inherits hundreds of miles

00:49:58.880 --> 00:50:01.440
 of additional roadway, which we need to account for

00:50:01.440 --> 00:50:03.080
 and pay for and maintain.

00:50:03.080 --> 00:50:05.560
 So like I said, it's a much bigger conversation

00:50:05.560 --> 00:50:08.360
 that's kind of beyond the scope of this conversation.

00:50:08.360 --> 00:50:11.920
 It's more of a policy-level discussion.

00:50:11.920 --> 00:50:12.960
 - Thank you.

00:50:12.960 --> 00:50:14.200
 - And my question is simple.

00:50:14.200 --> 00:50:16.480
 So the second bullet, that's an option.

00:50:16.480 --> 00:50:18.000
 That's not a requirement.

00:50:18.000 --> 00:50:20.360
 - Well, so that's where we messed up last year

00:50:20.360 --> 00:50:23.480
 when we were rewriting the criteria manual.

00:50:23.480 --> 00:50:26.160
 We added an enclosure or a compactor,

00:50:26.160 --> 00:50:28.840
 but we forgot to add a single enclosure for recycling.

00:50:28.840 --> 00:50:29.680
 - Oh, okay.

00:50:29.680 --> 00:50:33.000
 - So that's just a minor mistake that was on our part

00:50:33.000 --> 00:50:34.280
 that we're trying to correct this year.

00:50:34.280 --> 00:50:38.640
 But if they elect to get a compactor,

00:50:38.640 --> 00:50:40.680
 then that gives them the option to recycle in the future.

00:50:40.680 --> 00:50:44.280
 So we're not running into that same issue

00:50:44.280 --> 00:50:45.880
 with dumpsters sitting out in the parking lot.

00:50:45.880 --> 00:50:47.840
 - Okay, thank you.

00:50:47.840 --> 00:50:48.680
 - I will tell you,

00:50:48.680 --> 00:50:51.080
 this may not be the place to bring it up,

00:50:51.080 --> 00:50:52.720
 but I'm going to anyway.

00:50:52.720 --> 00:50:57.280
 If you can ever solve the problem of people

00:50:57.280 --> 00:51:02.280
 stopping and filling your dumpsters up,

00:51:02.280 --> 00:51:04.400
 I mean, off of the street.

00:51:04.400 --> 00:51:09.400
 That is a, you know, we've tried taking pictures

00:51:09.400 --> 00:51:13.720
 and basically that hasn't worked.

00:51:13.720 --> 00:51:17.200
 But that is a, and I don't know how to solve it.

00:51:17.200 --> 00:51:19.520
 It's a conversation I've had in a lot

00:51:19.520 --> 00:51:20.960
 of different committees.

00:51:20.960 --> 00:51:22.360
 But how do you solve?

00:51:22.360 --> 00:51:24.760
 Can we do something to educate?

00:51:24.760 --> 00:51:26.880
 That's a crime.

00:51:26.880 --> 00:51:27.840
 - Yeah, it's illegal.

00:51:27.840 --> 00:51:31.920
 But we do offer a lock and device for that dumpster

00:51:31.920 --> 00:51:33.600
 that it's a key that, you know,

00:51:33.600 --> 00:51:35.440
 we provide the lock for $20.

00:51:35.440 --> 00:51:37.960
 It's a lock and device with the lids on there.

00:51:37.960 --> 00:51:41.240
 So if you need access to it, you have a key lock to it.

00:51:41.240 --> 00:51:44.040
 We don't require that key or that lock

00:51:44.040 --> 00:51:46.480
 because it's a gravity unlocking system

00:51:46.480 --> 00:51:49.120
 where the truck picks up the dumpster, it locks it.

00:51:49.120 --> 00:51:51.640
 And then when it sets it back down, it relocks it.

00:51:51.640 --> 00:51:54.040
 But it's a $20 fee.

00:51:54.040 --> 00:51:57.400
 So if you're interested in that, one time fee.

00:51:57.400 --> 00:51:59.920
 - Thank you.

00:51:59.920 --> 00:52:02.160
 And I'm not sure, is it a misdemeanor here

00:52:02.160 --> 00:52:03.360
 for illegal dumping?

00:52:03.360 --> 00:52:06.280
 - I wouldn't know.

00:52:06.280 --> 00:52:08.720
 I don't think anybody on this knows.

00:52:08.720 --> 00:52:09.560
 - I'm just curious.

00:52:09.560 --> 00:52:11.520
 You don't have to answer that one.

00:52:11.520 --> 00:52:13.320
 - I would like it to be a felony.

00:52:13.320 --> 00:52:15.580
 (laughing)

00:52:15.580 --> 00:52:22.880
 - Yeah, yeah, it's a misdemeanor, yeah.

00:52:22.880 --> 00:52:25.360
 - All right.

00:52:25.360 --> 00:52:29.600
 Moving on to our stormwater and our drainage criteria manual.

00:52:29.600 --> 00:52:32.640
 So when going through this manual, we realized

00:52:32.640 --> 00:52:34.320
 there's lots of terms that we were using

00:52:34.320 --> 00:52:35.560
 throughout the manual.

00:52:35.560 --> 00:52:38.040
 And this manual actually has a definition

00:52:38.040 --> 00:52:39.280
 in the beginning of it.

00:52:39.280 --> 00:52:41.400
 And some of the terms that we were using throughout it

00:52:41.400 --> 00:52:42.280
 were unclear.

00:52:42.280 --> 00:52:44.440
 So we went through and redefined those terms

00:52:44.440 --> 00:52:46.520
 in the definition manual so that way everybody knew

00:52:46.520 --> 00:52:49.000
 what we were talking about and referring to.

00:52:49.000 --> 00:52:50.600
 And one of the things that we also looked at

00:52:50.600 --> 00:52:53.620
 is that for all developments in our city,

00:52:53.620 --> 00:52:56.040
 require everything to be designed

00:52:56.040 --> 00:52:57.280
 to the flood mitigation level,

00:52:57.280 --> 00:53:01.200
 which is the 100 year storm, which is great and all,

00:53:01.200 --> 00:53:04.240
 but the problem is that any time we have an infill project

00:53:04.240 --> 00:53:07.160
 or a redevelopment of like a downtown urban area

00:53:07.160 --> 00:53:10.480
 or a city project, the costs are redesigned

00:53:10.480 --> 00:53:13.280
 to 100 year flood and all the downstream impacts

00:53:13.280 --> 00:53:14.240
 are associated with that.

00:53:14.240 --> 00:53:15.840
 'Cause once you design your system

00:53:15.840 --> 00:53:17.640
 to be a higher flood standard,

00:53:17.640 --> 00:53:19.040
 you're basically just pushing the water

00:53:19.040 --> 00:53:20.160
 downstream to your neighbor.

00:53:20.160 --> 00:53:22.520
 So the way the criteria is written is that

00:53:22.520 --> 00:53:24.600
 you have to upgrade everything downstream

00:53:24.600 --> 00:53:26.560
 until you have no more impact.

00:53:26.560 --> 00:53:30.080
 Well, that becomes so restrictive and cost prohibitive

00:53:30.080 --> 00:53:33.080
 that projects just don't get built and can't get designed.

00:53:33.080 --> 00:53:35.800
 So we realized that was a problem.

00:53:35.800 --> 00:53:37.360
 We actually included a language in there

00:53:37.360 --> 00:53:40.040
 to allow us to say for all new developments

00:53:40.040 --> 00:53:41.500
 that are green field projects,

00:53:41.500 --> 00:53:43.200
 it's pretty simple to design to the 100 year

00:53:43.200 --> 00:53:44.840
 because you've just put a tension basin in,

00:53:44.840 --> 00:53:47.320
 you put bigger pipes in, whatever the case is.

00:53:47.320 --> 00:53:51.040
 But for redevelopment and urbanization

00:53:51.040 --> 00:53:54.880
 or internal projects where that cost becomes so prohibitive

00:53:54.880 --> 00:53:56.980
 that it stops projects in our tracks,

00:53:56.980 --> 00:54:00.760
 we allow us to go back and say, okay, for this project,

00:54:00.760 --> 00:54:02.960
 an incremental improvement is better than no improvement.

00:54:02.960 --> 00:54:04.880
 So we're okay with designing, upgrading,

00:54:04.880 --> 00:54:06.880
 us doing a smaller upgrade now

00:54:06.880 --> 00:54:09.400
 so that way we can start getting some

00:54:09.400 --> 00:54:11.400
 progressive improvements going on.

00:54:11.400 --> 00:54:13.560
 So we have added that to this criteria manual.

00:54:13.560 --> 00:54:15.840
 And one of the things also that we notice is that

00:54:15.840 --> 00:54:19.080
 in the standard specifications, we outlaw the use

00:54:19.080 --> 00:54:21.280
 or we do not allow the use of corrugated metal pipes

00:54:21.280 --> 00:54:23.880
 for drainage culverts and driveways.

00:54:23.880 --> 00:54:25.920
 However, our criteria manual still allowed that.

00:54:25.920 --> 00:54:27.700
 So this kind of goes back to the whole conversation

00:54:27.700 --> 00:54:30.080
 of finding conflict within the document itself.

00:54:30.080 --> 00:54:31.400
 So we found those references,

00:54:31.400 --> 00:54:33.040
 removed them out of our criteria manual

00:54:33.040 --> 00:54:34.200
 because we're getting questions as,

00:54:34.200 --> 00:54:36.400
 hey, your criteria manual says we can use

00:54:36.400 --> 00:54:37.640
 corrugated metal pipe,

00:54:37.640 --> 00:54:39.960
 your specifications say you can't use it.

00:54:39.960 --> 00:54:41.560
 So we ended up taking that out.

00:54:41.560 --> 00:54:45.800
 For the transportation criteria manual,

00:54:45.800 --> 00:54:48.040
 as you're probably all aware, we have the mobility plan.

00:54:48.040 --> 00:54:49.640
 - Oh, okay, Mr. T.

00:54:49.640 --> 00:54:51.480
 - Back to the storm water.

00:54:51.480 --> 00:54:56.480
 So I did notice that we're now using the I-swim standards.

00:54:56.480 --> 00:54:58.400
 - We have, yes, we have been.

00:54:58.400 --> 00:55:03.400
 - Okay, and so that's a wide variety of standards

00:55:03.400 --> 00:55:07.420
 that include everything from the concrete,

00:55:07.420 --> 00:55:13.160
 trapezoidal water flow to riprap

00:55:13.160 --> 00:55:16.440
 or kind of more natural structures.

00:55:16.440 --> 00:55:18.640
 And even talking about like on a green field,

00:55:18.640 --> 00:55:22.120
 they can put in a detention pond and pipes the right size.

00:55:22.120 --> 00:55:25.280
 And that's, and like that most basic design

00:55:25.280 --> 00:55:28.080
 is heavily concreted,

00:55:28.080 --> 00:55:29.680
 no, a little or no vegetation,

00:55:29.680 --> 00:55:31.000
 maybe a little green around the outside,

00:55:31.000 --> 00:55:33.080
 but a lot of times it's actually concrete bottoms

00:55:33.080 --> 00:55:35.440
 in the detention ponds to prevent erosion

00:55:35.440 --> 00:55:37.440
 and a concrete drainage structure,

00:55:37.440 --> 00:55:41.000
 which, and that is, that's the minimum,

00:55:41.000 --> 00:55:43.480
 but there are a lot of more creative options,

00:55:43.480 --> 00:55:48.480
 kind of like what you see behind Razor Ranch isn't bad.

00:55:49.480 --> 00:55:51.120
 The parking lots of Razor Ranch are kind of interesting.

00:55:51.120 --> 00:55:54.400
 And then if going down to behind

00:55:54.400 --> 00:55:59.840
 the shopping center near the mall,

00:55:59.840 --> 00:56:01.120
 I don't remember the name of it,

00:56:01.120 --> 00:56:03.640
 where like the Best Buy is,

00:56:03.640 --> 00:56:07.360
 they have some of those more like wetlands

00:56:07.360 --> 00:56:09.520
 with vegetation, heavily vegetated,

00:56:09.520 --> 00:56:13.600
 and using riprap and revetments instead of concrete,

00:56:13.600 --> 00:56:16.600
 which has all kinds of environmental benefits,

00:56:16.600 --> 00:56:18.720
 like increased soil, you know,

00:56:18.720 --> 00:56:20.680
 water is absorbed into the soil

00:56:20.680 --> 00:56:22.800
 as opposed to just flowing to the lake,

00:56:22.800 --> 00:56:24.400
 decreases your flood flows,

00:56:24.400 --> 00:56:26.280
 increases the friction on the flow, et cetera,

00:56:26.280 --> 00:56:30.280
 all these benefits, environmental, aesthetic, and otherwise.

00:56:30.280 --> 00:56:35.120
 Is there anything that we can do to encourage those options

00:56:35.120 --> 00:56:39.760
 as versus the lowest cost trapezoidal concrete channel?

00:56:39.760 --> 00:56:43.120
 - Yes, there is, and actually we have Mr. Mike Linder here,

00:56:43.120 --> 00:56:45.640
 which is our new drainage engineer.

00:56:46.880 --> 00:56:48.000
 - Hey, good morning.

00:56:48.000 --> 00:56:50.520
 I'm Mike Linder, the senior drainage engineer.

00:56:50.520 --> 00:56:54.000
 To address that, there are incentives, I believe,

00:56:54.000 --> 00:56:55.200
 in the Ditten Development Code,

00:56:55.200 --> 00:56:57.920
 more akin to the landscaping requirements

00:56:57.920 --> 00:56:59.840
 that go into a site.

00:56:59.840 --> 00:57:02.120
 That type of information really wouldn't be housed

00:57:02.120 --> 00:57:05.240
 in what is a technical design manual.

00:57:05.240 --> 00:57:08.920
 But I think as we go through the Ditten Development Code,

00:57:08.920 --> 00:57:11.640
 I know there's a section in here that lines out

00:57:11.640 --> 00:57:16.640
 low-impact development designs like you're discussing,

00:57:16.640 --> 00:57:18.760
 and kind of encourages people to do that,

00:57:18.760 --> 00:57:22.760
 and maybe we can look in other ways to, you know,

00:57:22.760 --> 00:57:24.680
 require a minimum level of that,

00:57:24.680 --> 00:57:27.080
 or more greatly encourage that,

00:57:27.080 --> 00:57:28.840
 but that's really something that would be

00:57:28.840 --> 00:57:32.880
 in the development code and not in a technical manual.

00:57:32.880 --> 00:57:35.400
 - Right, yeah, I just wanna make sure we do encourage that,

00:57:35.400 --> 00:57:37.720
 because it becomes an amenity to the city,

00:57:37.720 --> 00:57:39.680
 it benefits the landowners,

00:57:39.680 --> 00:57:42.240
 and the city benefits the landowner,

00:57:42.240 --> 00:57:44.360
 and everybody downstream.

00:57:44.360 --> 00:57:45.720
 - Absolutely. - Thank you.

00:57:45.720 --> 00:57:55.520
 - All right, moving on to our transportation criteria manual.

00:57:55.520 --> 00:57:59.080
 As you're probably all aware, we had the mobility plan

00:57:59.080 --> 00:58:02.040
 got updated, or adopted this March,

00:58:02.040 --> 00:58:04.320
 and so we actually went through our criteria manual

00:58:04.320 --> 00:58:06.120
 and made sure that all of our geometric standards

00:58:06.120 --> 00:58:07.520
 for all the roadway classifications

00:58:07.520 --> 00:58:09.760
 are consistent across both documents.

00:58:09.760 --> 00:58:10.720
 There are some slight tweaks,

00:58:10.720 --> 00:58:12.880
 so we updated those tables as well.

00:58:12.880 --> 00:58:16.200
 We added some discussion on turn lane warrants,

00:58:16.200 --> 00:58:19.280
 so we did have people requesting turn lanes.

00:58:19.280 --> 00:58:22.280
 We had no standard way to identify the stacking length,

00:58:22.280 --> 00:58:25.240
 the turn criteria to justify the installation

00:58:25.240 --> 00:58:27.040
 of a turn lane, and how big those openings

00:58:27.040 --> 00:58:28.160
 of those turn lanes need to be,

00:58:28.160 --> 00:58:30.240
 so we included all that.

00:58:30.240 --> 00:58:32.080
 We updated our on-street parking,

00:58:32.080 --> 00:58:34.000
 so our on-street parking was designed

00:58:34.000 --> 00:58:36.240
 to ADA and PRO Act standards.

00:58:36.240 --> 00:58:38.120
 We never discussed it and outlined

00:58:38.120 --> 00:58:39.640
 why they're designed the way it was.

00:58:39.640 --> 00:58:42.680
 We added several paragraphs in the prologue

00:58:42.680 --> 00:58:45.960
 of the parking section to talk about where design,

00:58:45.960 --> 00:58:48.760
 these are all laid out for ADA and PRO Act requirements,

00:58:48.760 --> 00:58:50.960
 the spacing, the slopes, and so it kind of lays out

00:58:50.960 --> 00:58:53.560
 why it was drawn the way it was.

00:58:53.560 --> 00:58:57.080
 As part of our traffic safety impact analysis,

00:58:57.080 --> 00:58:59.920
 our TIAs, is that we've included a discussion

00:58:59.920 --> 00:59:01.000
 in there for safety.

00:59:01.000 --> 00:59:05.440
 So before, it was all just based on traffic volume,

00:59:05.440 --> 00:59:07.160
 turning radius is turning,

00:59:07.160 --> 00:59:08.520
 so we actually put a discussion that says,

00:59:08.520 --> 00:59:10.920
 okay, well, in addition to the amount of volume of traffic

00:59:10.920 --> 00:59:12.560
 and how much traffic you're having,

00:59:12.560 --> 00:59:14.640
 we need to look at it from a safety standpoint as well,

00:59:14.640 --> 00:59:16.120
 'cause we do have some intersections

00:59:16.120 --> 00:59:19.320
 and roadways where we do have safety issues.

00:59:19.320 --> 00:59:21.000
 By the way, it was written before

00:59:21.000 --> 00:59:22.920
 that the safety portion wasn't,

00:59:22.920 --> 00:59:25.000
 we weren't able to enforce that,

00:59:25.000 --> 00:59:26.040
 so now we, by putting it in here,

00:59:26.040 --> 00:59:27.920
 we can say, hey, go back and look at this again.

00:59:27.920 --> 00:59:30.600
 You're having site issues, you're having other problems.

00:59:30.600 --> 00:59:33.240
 You can look at it from a safety standpoint as well.

00:59:33.240 --> 00:59:34.080
 Yes, go ahead.

00:59:34.080 --> 00:59:35.320
 - Thank you, Chair.

00:59:35.320 --> 00:59:37.440
 On your on-street parking,

00:59:37.440 --> 00:59:41.680
 Section 1.6 in the Criterion Manual,

00:59:41.680 --> 00:59:44.600
 am I, it's saying,

00:59:44.600 --> 00:59:49.640
 one on-street parking,

00:59:49.640 --> 00:59:52.320
 where on-street parking is designated,

00:59:52.320 --> 00:59:53.720
 one on-street parking space

00:59:53.720 --> 00:59:57.360
 for each single family unit or block is required.

00:59:57.360 --> 00:59:59.400
 So what's that first part saying,

00:59:59.400 --> 01:00:01.760
 where on-street parking is designated?

01:00:01.760 --> 01:00:04.040
 Does there have to be a sign there saying no parking

01:00:04.040 --> 01:00:06.800
 or some parking? - Yeah, so there has to be

01:00:06.800 --> 01:00:08.840
 some sort of marking for on-street parking.

01:00:08.840 --> 01:00:10.800
 If it's just like a wide shoulder,

01:00:10.800 --> 01:00:11.920
 it's open to parking,

01:00:11.920 --> 01:00:13.880
 but if you have a designated marking spot,

01:00:13.880 --> 01:00:15.400
 it's considered on-street parking then.

01:00:15.400 --> 01:00:19.720
 - Okay, so if there's no designation of on-street parking,

01:00:19.720 --> 01:00:24.720
 is it still just one vehicle per unit, single family unit?

01:00:24.720 --> 01:00:30.360
 - I believe, I don't think, I don't think so.

01:00:30.360 --> 01:00:31.920
 - Used to be though, didn't it?

01:00:34.160 --> 01:00:36.320
 - If I remember right, yeah, hi.

01:00:36.320 --> 01:00:40.520
 - Hi, Carina Maldonado,

01:00:40.520 --> 01:00:42.440
 Transportation Planner with Development Services.

01:00:42.440 --> 01:00:43.880
 Could you repeat the question?

01:00:43.880 --> 01:00:47.200
 - Well, it's indicating here that there's allowed

01:00:47.200 --> 01:00:49.800
 one vehicle in single family developments,

01:00:49.800 --> 01:00:52.560
 one vehicle per unit,

01:00:52.560 --> 01:00:56.440
 but the stipulation is where it's designated.

01:00:56.440 --> 01:00:59.880
 So I'm living, I'm in a newer development, an HOA,

01:00:59.880 --> 01:01:01.000
 and we've got no signs there,

01:01:01.000 --> 01:01:02.920
 but we've got some street parking issues

01:01:02.920 --> 01:01:07.240
 where there's four cars to one household,

01:01:07.240 --> 01:01:08.600
 two of them are in the driveway.

01:01:08.600 --> 01:01:11.120
 - Yeah, so going back to the development code,

01:01:11.120 --> 01:01:13.200
 our development code is what sets the standards

01:01:13.200 --> 01:01:14.600
 for minimum parking.

01:01:14.600 --> 01:01:16.840
 So single family residential would have to provide

01:01:16.840 --> 01:01:19.160
 four spaces on the property.

01:01:19.160 --> 01:01:22.640
 - Now on the property, off the street, right?

01:01:22.640 --> 01:01:24.960
 - And going back to the criteria manual,

01:01:24.960 --> 01:01:27.840
 there is a table that indicates whether parking is allowed

01:01:27.840 --> 01:01:29.960
 or not, so prohibited or not.

01:01:29.960 --> 01:01:33.200
 If it is prohibited, then that's where you wouldn't see

01:01:33.200 --> 01:01:34.560
 on street parking.

01:01:34.560 --> 01:01:39.560
 If it is permitted, it's based within the right-of-way

01:01:39.560 --> 01:01:42.960
 for that street, so residential street sections

01:01:42.960 --> 01:01:45.160
 typically allow for parking,

01:01:45.160 --> 01:01:49.520
 but there is no minimum requirement.

01:01:49.520 --> 01:01:51.400
 It doesn't say you have to provide one,

01:01:51.400 --> 01:01:52.760
 you have to provide two.

01:01:52.760 --> 01:01:54.320
 You just have to meet the requirements

01:01:54.320 --> 01:01:56.840
 in the criteria manual, which says, you know,

01:01:56.840 --> 01:01:59.440
 no parking within so many feet of an intersection,

01:01:59.440 --> 01:02:04.280
 of a driveway, so it's not specifically mentioned in there.

01:02:04.280 --> 01:02:06.400
 - Okay, and there's one other part, 1.6,

01:02:06.400 --> 01:02:10.720
 it says areas in front of or within five feet of a driveway,

01:02:10.720 --> 01:02:12.600
 within 20 feet of a street intersection,

01:02:12.600 --> 01:02:16.440
 within 15 feet of our fire habit shall not be counted

01:02:16.440 --> 01:02:18.840
 toward the required on-street parking.

01:02:18.840 --> 01:02:22.080
 - So the on-street parking comment is mostly related to,

01:02:22.080 --> 01:02:24.800
 let's say a multifamily development that were to come in,

01:02:24.800 --> 01:02:28.840
 and they were adjacent to a roadway that would permit

01:02:28.840 --> 01:02:30.800
 on-street parking, they would have to meet

01:02:30.800 --> 01:02:32.200
 those requirements.

01:02:32.200 --> 01:02:33.600
 - Okay, gotcha.

01:02:33.600 --> 01:02:34.880
 Can I meet with you after the meeting

01:02:34.880 --> 01:02:36.880
 just to get some clarification from my first--

01:02:36.880 --> 01:02:37.880
 - Sure. - Thank you.

01:02:37.880 --> 01:02:48.880
 - So reviewing the transportation criteria manual,

01:02:48.880 --> 01:02:55.160
 I'm trying to understand the bike lane

01:02:55.160 --> 01:03:00.120
 and bike amenities in geometric standards 1.3.

01:03:00.120 --> 01:03:02.160
 It seems like that's where that's really the only portion

01:03:02.160 --> 01:03:04.280
 that really covers kind of the bike lanes.

01:03:04.280 --> 01:03:06.080
 There's some definitions elsewhere.

01:03:06.080 --> 01:03:09.560
 And there's a bike accommodation required

01:03:09.560 --> 01:03:13.280
 and it's either parentheses seven or 10.

01:03:13.280 --> 01:03:17.660
 And parentheses seven has a footnote about sidewalks.

01:03:17.660 --> 01:03:20.560
 What is the number 10?

01:03:20.560 --> 01:03:24.080
 - There should be a subnote 10 in there, I believe.

01:03:24.080 --> 01:03:25.360
 - Well, yeah, the seven is a footnote,

01:03:25.360 --> 01:03:27.720
 but then the 10 looks like a size, maybe?

01:03:27.720 --> 01:03:29.760
 - Yeah, I think it's 10 foot width, the 10 foot width.

01:03:29.760 --> 01:03:30.920
 - 10 foot width.

01:03:30.920 --> 01:03:33.920
 - And is that an on-street accommodation?

01:03:33.920 --> 01:03:38.360
 What is it, is that a shared lane, bike lane?

01:03:38.360 --> 01:03:42.880
 - Yes, just stay.

01:03:42.880 --> 01:03:49.000
 - So the table is there for reference

01:03:49.000 --> 01:03:50.880
 to let you know whether or not,

01:03:50.880 --> 01:03:54.120
 based on the classification of the roadway,

01:03:54.120 --> 01:03:57.960
 what the minimum width of a facility would be.

01:03:57.960 --> 01:03:59.200
 When a development comes in,

01:03:59.200 --> 01:04:01.520
 they would have to look to our standard details,

01:04:01.520 --> 01:04:05.920
 which would identify the urban roadway section

01:04:05.920 --> 01:04:07.960
 and sidewalk section.

01:04:07.960 --> 01:04:10.920
 And then on top of that, our developers,

01:04:10.920 --> 01:04:13.400
 when they come in for a site plan,

01:04:13.400 --> 01:04:15.600
 they would also need to reference our mobility plan

01:04:15.600 --> 01:04:17.520
 and the bike plan element.

01:04:17.520 --> 01:04:21.040
 So if there's no bicycle facilities called out

01:04:21.040 --> 01:04:23.160
 on that specific roadway,

01:04:23.160 --> 01:04:26.600
 they would not need to provide that facility there.

01:04:26.600 --> 01:04:28.840
 So there's several places that a developer

01:04:28.840 --> 01:04:30.160
 would need to go back and reference.

01:04:30.160 --> 01:04:32.000
 So first, our mobility plan.

01:04:32.000 --> 01:04:33.560
 And when they come in for developments,

01:04:33.560 --> 01:04:34.760
 that's usually where we tell them,

01:04:34.760 --> 01:04:37.000
 "Hey, you're located next to a collector.

01:04:37.000 --> 01:04:40.800
 "This collector calls for bicycle facilities."

01:04:40.800 --> 01:04:45.880
 Our bike plan does say whether it's a shared street,

01:04:45.880 --> 01:04:48.600
 shared path, or otherwise,

01:04:48.600 --> 01:04:51.040
 so that it's kind of a combination of several things.

01:04:51.040 --> 01:04:54.760
 So for the criteria manual, it's just a basic reference.

01:04:54.760 --> 01:04:58.040
 They would still need to go back to our mobility plan

01:04:58.040 --> 01:04:59.760
 and to the standard details.

01:04:59.760 --> 01:05:04.760
 - Okay, and this raises some concerns on new development,

01:05:04.760 --> 01:05:07.160
 green field development,

01:05:07.160 --> 01:05:10.440
 where if it's not in the bike plan,

01:05:10.440 --> 01:05:13.880
 then you're not required to allocate footage to it.

01:05:14.920 --> 01:05:17.280
 And then you build the road,

01:05:17.280 --> 01:05:19.320
 and now we say five or 10 years later,

01:05:19.320 --> 01:05:22.280
 "Oh, there's an elementary school or something."

01:05:22.280 --> 01:05:23.120
 There's more development.

01:05:23.120 --> 01:05:27.840
 Now, this residential collector becomes a bike path,

01:05:27.840 --> 01:05:30.880
 but the road's too narrow and the right-of-way is narrow.

01:05:30.880 --> 01:05:34.440
 And now, if you want a bike path,

01:05:34.440 --> 01:05:39.440
 you have to remove parking or the front of somebody's yard

01:05:39.440 --> 01:05:41.680
 or something like that in order to get those in.

01:05:41.680 --> 01:05:46.240
 And so, and it might be addressed in the bike plan,

01:05:46.240 --> 01:05:51.000
 but I do worry that there is a table

01:05:51.000 --> 01:05:54.480
 and it's just unclear what it means.

01:05:54.480 --> 01:05:58.380
 And not so much on where the bike plan exists

01:05:58.380 --> 01:06:01.680
 in existing neighborhoods, but in the--

01:06:01.680 --> 01:06:02.520
 - Brand new.

01:06:02.520 --> 01:06:05.800
 - 200 square miles of planned development

01:06:05.800 --> 01:06:08.840
 we have around the outside of town

01:06:08.840 --> 01:06:11.760
 that I think we can have some generic requirements

01:06:11.760 --> 01:06:13.840
 about arterials and collectors and so forth,

01:06:13.840 --> 01:06:17.200
 must have this amount of accommodation,

01:06:17.200 --> 01:06:19.480
 even if they're not in the bike plan yet.

01:06:19.480 --> 01:06:23.600
 And I think that would belong in the criteria manual,

01:06:23.600 --> 01:06:26.240
 but it might belong somewhere else.

01:06:26.240 --> 01:06:27.200
 And if a developer says,

01:06:27.200 --> 01:06:29.040
 "Well, there's a reason why this arterial

01:06:29.040 --> 01:06:30.720
 "doesn't need any bike accommodation,"

01:06:30.720 --> 01:06:32.880
 or, "There's a reason why this collector doesn't,"

01:06:32.880 --> 01:06:35.920
 then they can deviate from the manual.

01:06:35.920 --> 01:06:40.640
 But to have it where the manual doesn't require it

01:06:40.640 --> 01:06:44.640
 unless it's in the bike plan, we got to catch 22.

01:06:44.640 --> 01:06:47.600
 Like the plan then comes back later and says,

01:06:47.600 --> 01:06:49.680
 "Oh, you should have built it, but it's too late now."

01:06:49.680 --> 01:06:52.000
 - Yeah, so that's a really great question,

01:06:52.000 --> 01:06:52.880
 really great point.

01:06:52.880 --> 01:06:57.640
 I think one of the ways that we're trying to plan

01:06:57.640 --> 01:07:00.640
 for those future improvements is in our roadway sections

01:07:00.640 --> 01:07:03.060
 and our classifications in the mobility plan.

01:07:03.060 --> 01:07:04.740
 So based on that classification,

01:07:04.740 --> 01:07:06.280
 there's certain right-of-way

01:07:06.280 --> 01:07:08.680
 that a development would need to provide.

01:07:08.680 --> 01:07:12.200
 In the development process, that's where we look at,

01:07:12.200 --> 01:07:13.680
 is there future connectivity?

01:07:13.680 --> 01:07:15.680
 Is there something that's warranting

01:07:15.680 --> 01:07:17.680
 that our TIA would be another way

01:07:17.680 --> 01:07:20.640
 for that connectivity to be called out?

01:07:20.640 --> 01:07:23.780
 So there's probably ways that we could improve

01:07:23.780 --> 01:07:25.880
 our criteria manual, maybe with a note.

01:07:25.880 --> 01:07:29.820
 I believe there is language that calls references back

01:07:29.820 --> 01:07:31.840
 to the mobility plan.

01:07:31.840 --> 01:07:35.080
 So there's things in place to capture that

01:07:35.080 --> 01:07:38.280
 where we would come back and make those improvements

01:07:38.280 --> 01:07:40.720
 if the development didn't put it in first

01:07:40.720 --> 01:07:42.720
 is through our capital improvements plan.

01:07:42.720 --> 01:07:44.320
 So going back to the mobility plan,

01:07:44.320 --> 01:07:46.640
 going back to the roadway or the right-of-way

01:07:46.640 --> 01:07:49.980
 that's available, our CIP can capture that.

01:07:49.980 --> 01:07:54.140
 - Yeah, and actually, so are the standard roadway designs,

01:07:54.140 --> 01:07:56.640
 are they part of the, are they going to be part

01:07:56.640 --> 01:07:59.080
 of this manual or are they a separate document

01:07:59.080 --> 01:08:00.680
 that's got its own update cycle?

01:08:01.520 --> 01:08:04.880
 - Yeah, for the standard details,

01:08:04.880 --> 01:08:07.120
 those are a separate document,

01:08:07.120 --> 01:08:09.880
 and those don't need to get council approval

01:08:09.880 --> 01:08:11.880
 with the same process, the different process.

01:08:11.880 --> 01:08:13.920
 It's more of a technical process,

01:08:13.920 --> 01:08:15.760
 but we are in the process of updating those

01:08:15.760 --> 01:08:16.960
 right now as well.

01:08:16.960 --> 01:08:18.360
 And one of the things I also want to point out

01:08:18.360 --> 01:08:19.920
 is that our mobility plan outlines

01:08:19.920 --> 01:08:23.040
 that we need to have 10-foot side paths for streets,

01:08:23.040 --> 01:08:26.420
 and those 10-foot side paths are the bike/pet facility,

01:08:26.420 --> 01:08:29.680
 so you don't have to have an on-street bike route anymore

01:08:29.680 --> 01:08:32.400
 'cause we're putting the bike, the 10-foot side path

01:08:32.400 --> 01:08:35.120
 on the roadways to get the vehicles

01:08:35.120 --> 01:08:37.400
 and the pedestrians separated.

01:08:37.400 --> 01:08:40.240
 - Yeah, and I think that's actually one of the,

01:08:40.240 --> 01:08:41.640
 I saw that in here and I wasn't sure

01:08:41.640 --> 01:08:43.660
 if that was what the design was.

01:08:43.660 --> 01:08:45.860
 So I have a couple of concerns.

01:08:45.860 --> 01:08:50.860
 First, we have a lack of citizen oversight.

01:08:50.860 --> 01:08:57.600
 If we have, if the manual says refer

01:08:57.600 --> 01:09:00.780
 to the engineering drawings, and the engineering drawings

01:09:00.780 --> 01:09:05.600
 are changed and approved without a board

01:09:05.600 --> 01:09:09.480
 or city council approval, usually you would have

01:09:09.480 --> 01:09:12.760
 your design drawings meet the requirements

01:09:12.760 --> 01:09:17.760
 of the manuals, and also, you know,

01:09:17.760 --> 01:09:19.960
 engineers would bring their engineering knowledge

01:09:19.960 --> 01:09:22.480
 and make sure they're technically correct.

01:09:22.480 --> 01:09:26.360
 To have this where the design manual

01:09:26.360 --> 01:09:28.560
 defers to whatever the drawings are

01:09:28.560 --> 01:09:32.320
 creates a lack of oversight.

01:09:32.320 --> 01:09:38.240
 And second, side paths are one of the best ways

01:09:38.240 --> 01:09:45.520
 to discourage cycling because they create

01:09:45.520 --> 01:09:47.880
 lots of friction points, because every time

01:09:47.880 --> 01:09:52.880
 a sidewalk reaches a road, you have multiple points

01:09:53.680 --> 01:09:57.000
 of friction where, they're great for children,

01:09:57.000 --> 01:09:58.400
 or somebody learning to ride a bike,

01:09:58.400 --> 01:10:00.600
 or somebody who's moving very slowly,

01:10:00.600 --> 01:10:04.640
 but if you're trying to ride through your neighborhood

01:10:04.640 --> 01:10:09.640
 to somewhere, a store or an event or a night out or work,

01:10:09.640 --> 01:10:13.080
 to have to stop at every intersection,

01:10:13.080 --> 01:10:16.140
 become a pedestrian, basically, cars aren't looking

01:10:16.140 --> 01:10:19.740
 at the sidewalk for a moving vehicle,

01:10:19.740 --> 01:10:21.880
 where if you're riding in the street,

01:10:21.880 --> 01:10:26.720
 then you, then cars see you, you don't have to yield

01:10:26.720 --> 01:10:29.240
 to the cross streets, if you, you know,

01:10:29.240 --> 01:10:30.880
 where you do have to yield to a cross street

01:10:30.880 --> 01:10:33.280
 if you're on the sidewalk and hitting the cross street

01:10:33.280 --> 01:10:34.980
 and then crossing the cross street.

01:10:34.980 --> 01:10:40.400
 - I have a question for Mr. Taylor.

01:10:40.400 --> 01:10:41.280
 - Okay. - Before you answer

01:10:41.280 --> 01:10:43.360
 his question. - Sure.

01:10:43.360 --> 01:10:47.040
 - This presupposes that bike paths should be included

01:10:47.040 --> 01:10:49.820
 with roadway construction, is that your point?

01:10:51.140 --> 01:10:54.560
 - Yes, and that the, well, they should be included

01:10:54.560 --> 01:10:55.860
 where they are appropriate.

01:10:55.860 --> 01:11:00.040
 And what neighborhoods do we want to declare

01:11:00.040 --> 01:11:02.200
 should not be bikeable?

01:11:02.200 --> 01:11:05.840
 - That'd be a discussion for another meeting.

01:11:05.840 --> 01:11:07.640
 - Yes, sir, that's actually what I was gonna ask,

01:11:07.640 --> 01:11:10.240
 Mr. Taylor, actually, the Public Utility Board

01:11:10.240 --> 01:11:12.280
 only has the ability to make comment

01:11:12.280 --> 01:11:14.480
 over the water, wastewater and drainage,

01:11:14.480 --> 01:11:16.440
 so we are more than happy to listen

01:11:16.440 --> 01:11:19.000
 to any of the questions or concerns that you have.

01:11:19.000 --> 01:11:21.360
 These are actually posted on our website.

01:11:21.360 --> 01:11:23.040
 Our team is more than happy to listen

01:11:23.040 --> 01:11:24.240
 to any of those concerns,

01:11:24.240 --> 01:11:26.280
 and they won't go to council 'til December,

01:11:26.280 --> 01:11:28.280
 so we've got plenty of time to meet with you.

01:11:28.280 --> 01:11:31.360
 But in respect for everyone else that's here,

01:11:31.360 --> 01:11:33.060
 I'd like to ask if we could take

01:11:33.060 --> 01:11:34.680
 the transportation-related questions

01:11:34.680 --> 01:11:35.840
 and meet with you separately, sir,

01:11:35.840 --> 01:11:36.880
 if that would be okay with you.

01:11:36.880 --> 01:11:40.080
 - Okay, thank you. - That's not our purview, yeah.

01:11:40.080 --> 01:11:40.920
 Thank you, Becky.

01:11:47.400 --> 01:11:49.800
 And then also we added discussion about

01:11:49.800 --> 01:11:52.280
 pedestrian access as well for the TIA,

01:11:52.280 --> 01:11:54.520
 so look at getting it from points of interest

01:11:54.520 --> 01:11:55.680
 to points of interest to include that

01:11:55.680 --> 01:11:57.240
 as part of the development process as well.

01:11:57.240 --> 01:12:00.680
 So we are trying to build those pedestrian facilities

01:12:00.680 --> 01:12:03.340
 in all of development, so kind of all related.

01:12:03.340 --> 01:12:06.600
 And then the last update,

01:12:06.600 --> 01:12:07.840
 last criteria manual we had to update

01:12:07.840 --> 01:12:10.480
 was our water, wastewater criteria manual.

01:12:10.480 --> 01:12:11.560
 We actually went through and looked

01:12:11.560 --> 01:12:13.080
 at some of the language in there.

01:12:13.080 --> 01:12:16.200
 Our language was a little bit misleading

01:12:16.200 --> 01:12:18.000
 in terms of the number of water meters

01:12:18.000 --> 01:12:20.320
 for multifamily developments.

01:12:20.320 --> 01:12:22.280
 Per state law, supposed to have a master meter

01:12:22.280 --> 01:12:23.520
 for multifamily developments,

01:12:23.520 --> 01:12:27.400
 with the development to have sub-meters to that,

01:12:27.400 --> 01:12:30.280
 so we clarified that to be consistent with the law.

01:12:30.280 --> 01:12:33.760
 We added discussion on backflow prevention, yes.

01:12:33.760 --> 01:12:37.120
 - So you're allowing sub-meters on a multi?

01:12:37.120 --> 01:12:40.440
 - Yes. - Okay.

01:12:40.440 --> 01:12:41.920
 That's it. - More comment?

01:12:41.920 --> 01:12:44.120
 - No, that answers it. - No, that's it, yes.

01:12:44.120 --> 01:12:45.720
 - We're all good. (laughs)

01:12:45.720 --> 01:12:47.920
 And then we also added discussion on backflow prevention,

01:12:47.920 --> 01:12:50.000
 which is also another requirement,

01:12:50.000 --> 01:12:51.240
 something that we were doing,

01:12:51.240 --> 01:12:54.200
 but we didn't outline it and have formal discussion on it,

01:12:54.200 --> 01:12:56.200
 so we included that.

01:12:56.200 --> 01:12:58.480
 We had a table within that document

01:12:58.480 --> 01:13:00.960
 that discussed separation of utilities.

01:13:00.960 --> 01:13:04.480
 It primarily dealt with crossing utilities,

01:13:04.480 --> 01:13:07.000
 so when you had private franchise utilities,

01:13:07.000 --> 01:13:09.840
 such as gas and whatever else,

01:13:09.840 --> 01:13:12.480
 crossing our public facilities,

01:13:12.480 --> 01:13:14.720
 the table was being misused and misinterpreted,

01:13:14.720 --> 01:13:17.120
 so we went through and tried to clarify that table

01:13:17.120 --> 01:13:18.640
 to make it easier to understand,

01:13:18.640 --> 01:13:20.840
 so we got fewer questions on it.

01:13:20.840 --> 01:13:24.040
 And we also added a discussion on grease traps

01:13:24.040 --> 01:13:26.720
 and grit traps, which kinda seems like a weird location

01:13:26.720 --> 01:13:29.560
 to have it in the Wastewater Criteria Manual.

01:13:29.560 --> 01:13:30.880
 We talked about this a little bit.

01:13:30.880 --> 01:13:33.520
 We talked about do we need to put it into a health code

01:13:33.520 --> 01:13:34.960
 because it relates to restaurants

01:13:34.960 --> 01:13:39.520
 and places that are food processing facilities,

01:13:39.520 --> 01:13:42.320
 and the decision was we need to discuss it somewhere,

01:13:42.320 --> 01:13:44.880
 and because if anything of those overflow,

01:13:44.880 --> 01:13:46.720
 they flow into our wastewater system,

01:13:46.720 --> 01:13:48.560
 and so we thought the best place to put it

01:13:48.560 --> 01:13:49.440
 would be to have it here,

01:13:49.440 --> 01:13:50.840
 to have some sort of discussion

01:13:50.840 --> 01:13:53.480
 to capture the requirements related to that.

01:13:53.480 --> 01:13:54.960
 - It impacts your wastewater,

01:13:54.960 --> 01:13:57.120
 so it's appropriate to be in there.

01:13:57.120 --> 01:13:58.520
 - Yep.

01:13:58.520 --> 01:13:59.520
 When we first talked about it,

01:13:59.520 --> 01:14:01.080
 we were like, does it really need to go here?

01:14:01.080 --> 01:14:03.240
 So we had a little bit of discussion on that.

01:14:03.240 --> 01:14:06.400
 So for our next steps,

01:14:06.400 --> 01:14:07.800
 our next presentation is gonna be

01:14:07.800 --> 01:14:11.280
 to the Texas Society of Professional Engineers in November.

01:14:11.280 --> 01:14:13.240
 We will do another update to City Council

01:14:13.240 --> 01:14:15.120
 via Friday report.

01:14:15.120 --> 01:14:16.800
 We will eventually advertise this

01:14:16.800 --> 01:14:20.040
 to Denton Record Chronicle that we are making the updates.

01:14:20.040 --> 01:14:22.240
 We do have everything posted online

01:14:22.240 --> 01:14:25.320
 for comment and feedback from the public.

01:14:25.320 --> 01:14:26.720
 All those comments will be reviewed

01:14:26.720 --> 01:14:30.440
 and either analyzed and added to the criteria manuals

01:14:30.440 --> 01:14:32.840
 before it goes to Council in December.

01:14:32.840 --> 01:14:35.720
 Again, here's our layout.

01:14:35.720 --> 01:14:38.600
 So we have about halfway through our public output,

01:14:38.600 --> 01:14:41.920
 public outreach.

01:14:41.920 --> 01:14:43.760
 And do you have any questions?

01:14:43.760 --> 01:14:46.040
 Mr. Beck.

01:14:46.040 --> 01:14:47.320
 - Just one real quick.

01:14:47.320 --> 01:14:48.800
 For my own personal edification,

01:14:48.800 --> 01:14:51.320
 criteria manuals are just informational

01:14:51.320 --> 01:14:54.240
 for developers, concerns and stuff like that.

01:14:54.240 --> 01:14:58.400
 As far as what's required by ordinance or law,

01:14:58.400 --> 01:15:00.600
 that's gonna be in the development code, is that right?

01:15:00.600 --> 01:15:03.040
 - So the criteria manuals we actually,

01:15:03.040 --> 01:15:04.800
 we hold the developers.

01:15:04.800 --> 01:15:07.640
 Those are like a guiding document for the city.

01:15:07.640 --> 01:15:08.880
 - Do they have enforcement power?

01:15:08.880 --> 01:15:10.440
 - Yes, yes they do, yes.

01:15:10.440 --> 01:15:13.680
 - Okay, so if somebody had a particular issue

01:15:13.680 --> 01:15:16.560
 within these criteria manuals, they could cite that.

01:15:16.560 --> 01:15:17.560
 - Correct. - Okay.

01:15:17.560 --> 01:15:19.480
 - So we actually do have a process.

01:15:19.480 --> 01:15:21.880
 We have a Monday meeting every Monday afternoon

01:15:21.880 --> 01:15:24.960
 where developments or projects that are unable

01:15:24.960 --> 01:15:27.360
 to meet certain criteria within the manual,

01:15:27.360 --> 01:15:28.520
 they request a variance.

01:15:28.520 --> 01:15:29.960
 We're kind of working on the language,

01:15:29.960 --> 01:15:31.720
 but for now it's called a variance.

01:15:31.720 --> 01:15:35.440
 And the language conflicts with the development codes

01:15:35.440 --> 01:15:38.560
 are looking at different terms instead of the word variance.

01:15:38.560 --> 01:15:41.240
 But they request a variance from the city engineer,

01:15:41.240 --> 01:15:42.080
 from Becky.

01:15:42.080 --> 01:15:45.480
 We meet internally, discuss the proposed change.

01:15:45.480 --> 01:15:46.840
 Why can't they meet the change?

01:15:46.840 --> 01:15:50.520
 We analyze and determine if it's an acceptable reason

01:15:50.520 --> 01:15:53.720
 to not design to our city standard.

01:15:53.720 --> 01:15:56.880
 And then we sign off on if it's acceptable or not.

01:15:56.880 --> 01:15:57.920
 - Okay, thanks.

01:15:57.920 --> 01:16:00.120
 - Other questions?

01:16:00.120 --> 01:16:04.760
 - Thank you. - All right, thank you.

01:16:06.080 --> 01:16:09.760
 - All right, it is 10/17.

01:16:09.760 --> 01:16:12.440
 Do we have a motion to adjourn?

01:16:12.440 --> 01:16:14.560
 Okay, we got two over here.

01:16:14.560 --> 01:16:15.840
 Lee and Larry are fighting.

01:16:15.840 --> 01:16:16.920
 We have our adjourn.