1 00:00:00,000 --> 00:00:11,480 Good morning and welcome. I'd like to open the Public Utility Board meeting for the City 2 00:00:11,480 --> 00:00:21,880 of Denton on Monday July 2022. It is 9 a.m. First point of order, are there any members 3 00:00:21,880 --> 00:00:27,480 from the public that would like to speak or make any comments or ask any questions? Doesn't 4 00:00:27,480 --> 00:00:34,200 appear to be so. Is anybody on the phone? No? If not, we'll move on to the regular meeting. 5 00:00:34,200 --> 00:00:40,240 And the Consent Agenda. I've had some requests to pull some items. So far I've got A, B, 6 00:00:40,240 --> 00:00:50,280 and F. Anybody else? Ben? Item D is in Dog. D is in Dog. I think that's plenty. Would 7 00:00:50,280 --> 00:00:58,680 you like to consider items C and E? Oh, I'm sorry. I left the next page off. G is there 8 00:00:58,680 --> 00:01:06,480 also. C and E and G. We got three. Chair, who have you got down pulling B? I thought 9 00:01:06,480 --> 00:01:10,920 it was C. Well, I'm going to if somebody else didn't want to. I think you did, didn't you? 10 00:01:10,920 --> 00:01:16,320 Did you not? I will. You did. Okay. Okay. I did initially too. I was talking with Tony. 11 00:01:16,320 --> 00:01:24,280 I looked at the yeah. But I found out what I needed, so. I'd like to pull it. If we pull 12 00:01:24,280 --> 00:01:28,960 B, it has to be moved to closed session. Yes. Just making sure you know. Yeah. Okay. All 13 00:01:28,960 --> 00:01:35,240 right. Let's try this again. We're going to consider a motion for items C, E, and G. So 14 00:01:35,240 --> 00:01:43,440 moved. Second. The motion is second. All those in favor, please say aye. Aye. Any opposed? 15 00:01:43,440 --> 00:01:57,640 No. All right. Let's talk about item A. That was you, Lee, right? Can I say you? Yes, sir. 16 00:01:57,640 --> 00:02:08,900 I pulled that. I requested item A. He's coming. Okay. Here comes Brian. Good morning. Good 17 00:02:08,900 --> 00:02:17,560 morning. So just to restate your question or concern, this is a fairly thick document 18 00:02:17,560 --> 00:02:26,040 that we've got here and fairly robust in its plan looking at managing solid waste in the 19 00:02:26,040 --> 00:02:33,220 city of Denton over the next 40 plus years. Several of y'all have not been with us throughout 20 00:02:33,220 --> 00:02:37,840 this entire process. We started back October a couple of years ago. COVID slowed us down 21 00:02:37,840 --> 00:02:42,360 a little bit because we couldn't get together like we would normally do in a planning process. 22 00:02:42,360 --> 00:02:50,200 But we're here today to really sort of roll out and get the resolution passed to accept 23 00:02:50,200 --> 00:02:56,720 the strategy itself with a focus on diversion. Not transportation diversion, you know, moving 24 00:02:56,720 --> 00:03:01,880 waste from one point to another, but diverting waste from being ultimately disposed of. What 25 00:03:01,880 --> 00:03:07,920 the strategy outlines is the tools. It's kind of like, you know, the old movie Apollo 13. 26 00:03:07,920 --> 00:03:12,560 You know, they get up in space. There's an explosion. They got to get them back to Earth. 27 00:03:12,560 --> 00:03:17,400 And they only got so many resources and so many things that they can do. And there was 28 00:03:17,400 --> 00:03:21,840 the wonderful line said, well, it wasn't designed to do that. And that's really sort of where 29 00:03:21,840 --> 00:03:26,360 we're at now. It's, okay, what can it do? What can we do with the materials we have available 30 00:03:26,360 --> 00:03:33,480 to make the necessary elimination of the waste ultimate disposal? Whether it be through traditional 31 00:03:33,480 --> 00:03:39,340 recycling, whether it be through non-programmatic recycling, such as textiles, you know, whatever 32 00:03:39,340 --> 00:03:46,160 other material that might be out there. So and then looking and partnering with other 33 00:03:46,160 --> 00:03:51,500 cities that may be bringing their waste here to become more robust in their diversionary 34 00:03:51,500 --> 00:03:59,580 tactics also. Just a couple of minutes ago, y'all approved the new gen cost of service 35 00:03:59,580 --> 00:04:03,080 study. That's going to be important for us as we start trying to figure out how much 36 00:04:03,080 --> 00:04:06,640 this thing is going to cost. Because again, looking at specifically, you know, how much 37 00:04:06,640 --> 00:04:12,440 we have to spend every time we touch a piece of garbage is really important for us to do 38 00:04:12,440 --> 00:04:18,600 that. So, you know, going as we go through not only this budget planning session, but 39 00:04:18,600 --> 00:04:23,520 also future budget planning sessions that will help us define what these different costs 40 00:04:23,520 --> 00:04:30,640 are going to be. Ideally, in a best case scenario, best case world, third party partners throughout 41 00:04:30,640 --> 00:04:35,040 the city will be, whether we bring them in through some sort of economic development 42 00:04:35,040 --> 00:04:40,440 issues or existing providers here, we'll be managing some of this waste independent 43 00:04:40,440 --> 00:04:45,160 of the city of Denton so that we don't have to touch it. So it will be net zero to us 44 00:04:45,160 --> 00:04:52,200 at that end. And by doing that, we can keep control on the cost that our residents are 45 00:04:52,200 --> 00:04:56,500 having to pay curbside to manage their material. 46 00:04:56,500 --> 00:05:02,720 What kind of time frame do you think it's going to take to implement these new programmatic 47 00:05:02,720 --> 00:05:03,720 policies? 48 00:05:03,720 --> 00:05:09,360 Well, again, it's continual learning is what it is. And one of the good parts about 49 00:05:09,360 --> 00:05:14,040 having a strategy versus a plan, it allows us to be much more nimble and much more quick 50 00:05:14,040 --> 00:05:19,200 to respond to things such as market forces, designs and technology changes, changes in 51 00:05:19,200 --> 00:05:25,520 state law. I mean, currently, we cannot put a bag ban or a bottle deposit bill in place 52 00:05:25,520 --> 00:05:31,600 here in the city of Denton or across the state because the Texas State Charter says we can't. 53 00:05:31,600 --> 00:05:35,520 They've got privacy on that rule. So again, you know, given those two things that hobble 54 00:05:35,520 --> 00:05:39,720 us just a little bit, what are we going to have to do to manage that material moving 55 00:05:39,720 --> 00:05:44,480 forward? What kind of incentives might we have to do? How can we create value in this 56 00:05:44,480 --> 00:05:49,280 material so that somebody, maybe other than our current processor, Pratt, but somebody 57 00:05:49,280 --> 00:05:54,720 like film, Pratt can't take it. So, you know, who would be -- and when I talk about film, 58 00:05:54,720 --> 00:06:00,040 I'm talking about plastic sheeting, plastic things of that nature that are not rigid containers. 59 00:06:00,040 --> 00:06:04,360 So who can we get in town that will help us collect that, but more importantly process 60 00:06:04,360 --> 00:06:09,880 that for ultimate recycling and end use as opposed to disposal. 61 00:06:09,880 --> 00:06:13,600 >> Okay. Well, back to my question. Time frame? 62 00:06:13,600 --> 00:06:19,520 >> Time frame. Again, this is, as I said earlier, this is a continual process. We've put a couple 63 00:06:19,520 --> 00:06:27,240 of really short-term goals and long-term goals. As we had stated earlier in our budget presentation 64 00:06:27,240 --> 00:06:31,440 here a couple, three weeks ago, we want to be able to divert, you know, over 30 percent 65 00:06:31,440 --> 00:06:39,640 by 2030, 40 percent by 2040, 75 percent by 2075. We feel that these are attainable just 66 00:06:39,640 --> 00:06:43,240 because of the time frame that they're in, but also it gives us the time to ramp up, 67 00:06:43,240 --> 00:06:49,640 you know, to get some of these programs in place. You know, we're not going to be putting 68 00:06:49,640 --> 00:06:54,320 any physical plans or physical programs in place in this next budget year. There's a 69 00:06:54,320 --> 00:06:57,600 lot of things administratively that we have to do. We're going to have to change our code 70 00:06:57,600 --> 00:07:02,200 of ordinances to help support what's in the plan here. We're going to have to go out with 71 00:07:02,200 --> 00:07:06,520 some economic development plans, try to identify third-party providers to come in and manage 72 00:07:06,520 --> 00:07:13,360 construction and demolition debris, rock, non-programmatic materials such as textiles, 73 00:07:13,360 --> 00:07:19,000 you know, the material that Pratt can't take, you know, glass. Currently, you know, Pratt 74 00:07:19,000 --> 00:07:22,560 is doing a wonderful job by managing our glass, but they have to transport it all the way 75 00:07:22,560 --> 00:07:27,780 down to Houston for it to be processed. If we can find enough glass here in the North 76 00:07:27,780 --> 00:07:32,160 Texas area so that we can get glass processor here in the city of Denton, not only have 77 00:07:32,160 --> 00:07:35,840 we reduced emissions from hauling that stuff all the way down to Houston, but we've created 78 00:07:35,840 --> 00:07:41,160 jobs, we've created a market, and so that's part of what all of next year will be. And 79 00:07:41,160 --> 00:07:46,280 then in 2023, '24, that's when we start putting physical things in place, such as, you know, 80 00:07:46,280 --> 00:07:53,360 additional recycling. We're looking at implementing a comprehensive diversion ordinance where everybody 81 00:07:53,360 --> 00:07:57,640 will have to recycle in some way, shape, or form. So from commercially, it's not going 82 00:07:57,640 --> 00:08:02,480 to be optional anymore, but you're going to tell us how you're going to do it and the 83 00:08:02,480 --> 00:08:05,880 material that you have to recycle. So it may be the programmatic stuff that we currently 84 00:08:05,880 --> 00:08:10,480 take, you know, bottles, containers, metal cans, things of that nature, or places like 85 00:08:10,480 --> 00:08:16,580 Tetrapak and Peterbilt, which, you know, currently have wonderful zero waste type of facilities. 86 00:08:16,580 --> 00:08:20,840 So managing that material themselves, they're the experts in what they manage. They can 87 00:08:20,840 --> 00:08:24,600 work within their supply chain to manage that, and that's really what we want to leverage 88 00:08:24,600 --> 00:08:29,520 through the implementation. You had mentioned about the transportation all the way to Houston 89 00:08:29,520 --> 00:08:35,560 for the glass. Yes. By getting something up here, does that also reduce the cost of the 90 00:08:35,560 --> 00:08:39,640 recycling? Yes, it does. Because again, you know, every time somebody touches this, every 91 00:08:39,640 --> 00:08:44,400 mile that we have to put it on the road, you know, increases the processing cost. Currently, 92 00:08:44,400 --> 00:08:49,160 you know, we're very fortunate with our contract with Pratt because currently we don't pay 93 00:08:49,160 --> 00:08:53,440 anything for the processing, but many of the cities around here are paying between $75 94 00:08:53,440 --> 00:09:00,640 and $90 a ton just to manage that material so that it can go into processing. So if we 95 00:09:00,640 --> 00:09:06,320 can get something here, it significantly reduces that processing cost. When we get out of this 96 00:09:06,320 --> 00:09:10,920 current contract with Pratt, I would imagine that we're going to be faced with increased 97 00:09:10,920 --> 00:09:15,720 processing charges instead of zero, like we're doing now. So we have to position ourselves 98 00:09:15,720 --> 00:09:19,720 right now to be able to manage that material at the lowest possible. In preparation for 99 00:09:19,720 --> 00:09:24,640 that. In preparation, correct. Well, thank you. That answers most of my questions, so 100 00:09:24,640 --> 00:09:32,240 I'll certainly let some others get a word in edgewise. Mr. Beck? Takes time. Good morning. 101 00:09:32,240 --> 00:09:37,440 Good morning. On your waste management hierarchy, you've got source reduction. You were talking 102 00:09:37,440 --> 00:09:42,040 about Tetra Pak and what they're doing. Would that be something that would fall into that 103 00:09:42,040 --> 00:09:48,720 category? I mean, can you give us kind of a broad? Yeah. I mean, source reduction is 104 00:09:48,720 --> 00:09:53,560 much bigger than just taking it off the top and not bringing it to us. I mean, source 105 00:09:53,560 --> 00:09:57,920 reduction can even be looking at our own households. So instead of just going through the grocery 106 00:09:57,920 --> 00:10:01,280 store, this looks good, this looks good, this looks good. You know, if you make a menu and 107 00:10:01,280 --> 00:10:05,620 buy only what you need, then you don't have that bag of salad or a bag of kale that looked 108 00:10:05,620 --> 00:10:09,880 really good, but now it's this green mushy thing sitting in the bottom of the refrigerator. 109 00:10:09,880 --> 00:10:15,160 So you buy what you need, you buy only what you need, and then you use it all completely. 110 00:10:15,160 --> 00:10:18,600 So that's the source reduction. Same thing, you know, as you scale up to something like 111 00:10:18,600 --> 00:10:22,760 a Tetra Pak, you know. Most of your things are first in, first out, buy only what you 112 00:10:22,760 --> 00:10:28,760 need, use it all, don't have anything else to throw away. Okay. So this is just a concept 113 00:10:28,760 --> 00:10:33,280 that can be put out there in the public. We've got to lay on the public that they have some 114 00:10:33,280 --> 00:10:37,760 obligations. Correct. You know, and it's not this, this is not the City of Denton's program 115 00:10:37,760 --> 00:10:45,000 as a unity. It is a City of Denton cooperative. It's going to be a partnership between residents, 116 00:10:45,000 --> 00:10:50,800 commercial businesses, visitors to the city, us as the city actually being the implementing 117 00:10:50,800 --> 00:11:02,160 agency to make this happen. Great. Thank you. Kevin. Thank you, Chair. So this, the plan 118 00:11:02,160 --> 00:11:10,040 is really thorough. It's amazing. I actually missed the, in April, I believe, we came before 119 00:11:10,040 --> 00:11:13,960 the board and I was not able to attend that meeting. And, you know, it's got a lot of 120 00:11:13,960 --> 00:11:22,800 great goals and a lot of information. The research depth of Burns and... Burns and McDonnell. 121 00:11:22,800 --> 00:11:29,280 Burns and McDonnell. They have amazing resources. And so I have to say, the plan looks beautiful. 122 00:11:29,280 --> 00:11:36,640 I think it's very important to reflect on Appendix B, which is the citizen input. Correct. 123 00:11:36,640 --> 00:11:43,160 The think tank. And, you know, this, the items in Appendix B, the goals that the citizens 124 00:11:43,160 --> 00:11:49,360 want, the vision the citizens like, you know, that's, that's been really consistent since 125 00:11:49,360 --> 00:11:57,400 I started participating in citizen stuff in Denton, maybe about 20 years ago, like the 126 00:11:57,400 --> 00:12:03,160 citywide comprehensive plan, the 2020 plan, the 2030 plan. Are we on the 2040 plan now? 127 00:12:03,160 --> 00:12:09,800 I think. 2040 plan now, yeah. Yeah. So like in 2020, the 2020 plan and the 2030 plan, 128 00:12:09,800 --> 00:12:16,520 and I assume the 2040 plan, there was a lot of focus on, we want to be innovators and 129 00:12:16,520 --> 00:12:25,040 leaders, you know, and, and I think in our, in our goals, we have to get the data collection 130 00:12:25,040 --> 00:12:28,300 put together where we can measure whether or not we're achieving our goals, whether 131 00:12:28,300 --> 00:12:34,480 or not we're improving, where we have to have, you have to have the administrative capability 132 00:12:34,480 --> 00:12:39,400 to launch new programs, evaluate them, terminate them if necessary, or support them if they're 133 00:12:39,400 --> 00:12:44,560 doing well. So there is a bunch of back office work, if you will. So I definitely understand. 134 00:12:44,560 --> 00:12:49,000 I think that's, that's great. And I hope we can, this board can support that back office 135 00:12:49,000 --> 00:12:56,640 and administrative work. And I do think though, the goals here in the plan will be a starting 136 00:12:56,640 --> 00:13:03,000 point to continue to follow the vision of the citizens that, that's been carried for 137 00:13:03,000 --> 00:13:08,640 at least 20 years of really innovating and trying to, you know, do the best thing for 138 00:13:08,640 --> 00:13:16,000 the citizens cost wise, environmental impact, neighborhood wise, you know, diversion wise, 139 00:13:16,000 --> 00:13:22,200 cost of permitting, you know, like when we fill up the landfill again, now we just expanded 140 00:13:22,200 --> 00:13:27,840 it, you know, at some point we, you know, we want, this is an important reason for diversion 141 00:13:27,840 --> 00:13:34,200 is to make that landfill last as long as possible. You know, at one point, you know, that we've 142 00:13:34,200 --> 00:13:40,040 talked about zero waste, and it's perhaps not fully feasible, but it's, I think it's 143 00:13:40,040 --> 00:13:44,840 an aspirational goal. We want to not have to keep making new landfills a hundred years 144 00:13:44,840 --> 00:13:50,520 from now. And I don't know if we'll get there even in a hundred years. So like I said, the 145 00:13:50,520 --> 00:13:55,240 content of this plan is really great. And I just want to make sure that we say this is, 146 00:13:55,240 --> 00:14:02,760 this is the starting point and that we can continue to find new ways to divert, to improve 147 00:14:02,760 --> 00:14:09,440 our efficiency, to improve our environmental footprint. And, you know, whether it's partnering 148 00:14:09,440 --> 00:14:14,840 with external partners or improving internal systems, you know, in the, within the solid 149 00:14:14,840 --> 00:14:15,840 waste department. 150 00:14:15,840 --> 00:14:18,960 Well, I think you hit the nail right on the head is this is a starting point. And again, 151 00:14:18,960 --> 00:14:23,160 it's the strategy, not a plan. Plans are very static. We're going to do, we're going to 152 00:14:23,160 --> 00:14:26,400 put this kind of collection in place. But what this allows us to do is look at that 153 00:14:26,400 --> 00:14:31,120 data and, and right as you said, be able to evaluate, be very nimble in how we approach 154 00:14:31,120 --> 00:14:35,080 the, you know, the, the reduction and the diversion of this material when also thank 155 00:14:35,080 --> 00:14:40,680 you for bringing up the comp plan. We went into this sort of arm in arm with the development 156 00:14:40,680 --> 00:14:45,760 department to ensure that it was consistent with the planning and the, and the timeframe 157 00:14:45,760 --> 00:14:49,720 of the comp plan. In previous comprehensive plans, you've had, you know, we're going 158 00:14:49,720 --> 00:14:53,960 to do these sustainability things and these solid waste things. I think one absence that 159 00:14:53,960 --> 00:14:58,960 you'll notice in this current comprehensive plan is it doesn't talk about specific solid 160 00:14:58,960 --> 00:15:03,240 waste goals, but what it does is it references our solid waste strategy. And just as you 161 00:15:03,240 --> 00:15:07,680 said, you know, it serves at that building, that building block, that spring point, spring 162 00:15:07,680 --> 00:15:13,560 board, you know, into to continual improvement and growth, you know, talking with the community 163 00:15:13,560 --> 00:15:20,160 about what needs to happen and then how we go about implementing some of those programs. 164 00:15:20,160 --> 00:15:21,160 Thank you. 165 00:15:21,160 --> 00:15:29,240 Very good input. It was a great program. Looks like a really good plan. Thank you. I was 166 00:15:29,240 --> 00:15:32,720 telling you that earlier. I really appreciate what you're doing. I appreciate the support 167 00:15:32,720 --> 00:15:41,600 that y'all give us here. So thank you. Mr. Rebek. I'd like to move we approve item A. 168 00:15:41,600 --> 00:15:47,360 The motion and a second. Any further discussion? If not, all those in favor, please say aye. 169 00:15:47,360 --> 00:15:54,800 Any opposed? Item A is passed. Thank you. Thank you. Okay, we're going to move on to 170 00:15:54,800 --> 00:16:08,480 item D. D is in dog. See why somebody might have a question on that. Ben. Good morning. 171 00:16:08,480 --> 00:16:13,440 Mark Zimmer, DME engineering. Happy to answer any questions you might have. Howdy. Okay. 172 00:16:13,440 --> 00:16:24,040 So kind of looking through this. So we've got a retainer for the company and then billable 173 00:16:24,040 --> 00:16:32,120 hours for work. It just kind of makes me wonder how does that compare to if we hired staff 174 00:16:32,120 --> 00:16:37,760 to do that as the as the city? What's the benefit to us? So staff does not have people 175 00:16:37,760 --> 00:16:41,440 capable of performing that type of work, nor do we have the equipment needed to work on 176 00:16:41,440 --> 00:16:48,760 the transmission lines. Okay. Just not even an option? Right. Okay. That's a good reason. 177 00:16:48,760 --> 00:16:57,800 I think that's all I had actually. It's a lot of money though, Ben. Yeah, yeah. Anybody 178 00:16:57,800 --> 00:17:11,620 else? I'm sorry. About how many events per year per 10 years require us to use transmission 179 00:17:11,620 --> 00:17:16,200 voltage repair services? Yes. And I've been here for almost 10 years and we've had to 180 00:17:16,200 --> 00:17:24,560 use it one time. And so this this $150,000 it's really insurance, right? Just it just 181 00:17:24,560 --> 00:17:29,200 ensures they're available in the event we need them. Even though we have contract with 182 00:17:29,200 --> 00:17:33,400 them now, it doesn't guarantee they'll be available for work and emergencies. It just 183 00:17:33,400 --> 00:17:39,000 kind of guarantees rates, right? So this retainer guarantees them to be available within eight 184 00:17:39,000 --> 00:17:53,120 hours with two crews and the equipment needed. Anyone else? Okay. Entertain a motion. Mr. 185 00:17:53,120 --> 00:18:02,320 Ryback. Mr. Ryback, second. Any more discussion? If not, all those in favor, please say aye. 186 00:18:02,320 --> 00:18:13,120 Aye. Opposed? Passes. Thank you very much. Okay. Item F, as in Frank. Is that was that 187 00:18:13,120 --> 00:18:24,520 you, Ben? No, I'm sorry. Good morning. I'm Jerry Field. I'm the engineering division 188 00:18:24,520 --> 00:18:31,080 manager for DME. What questions do you have regarding this project? Mr. Ryback. Yes, I 189 00:18:31,080 --> 00:18:34,960 was the one who asked to pull this. I was curious if you could just give us a little 190 00:18:34,960 --> 00:18:42,840 bit more information about this particular item. And I didn't have anything in specific, 191 00:18:42,840 --> 00:18:48,640 but you know, there are some dollars involved and there's a program implementation. I thought 192 00:18:48,640 --> 00:18:52,800 perhaps you could tell us a little bit more about it. You bet. I'll do my best without 193 00:18:52,800 --> 00:18:57,120 getting into too much ingenuity. Some of you guys may understand it, but we tend to come 194 00:18:57,120 --> 00:19:02,960 a little bit more in depth on conversation. But these items are items that we put at the 195 00:19:02,960 --> 00:19:06,760 end of all the, or we're going to eventually put at the end of a hundred feeders. And we 196 00:19:06,760 --> 00:19:11,120 call them, I'm calling them a bell weather meter. And what it does is it gives us a real 197 00:19:11,120 --> 00:19:16,440 time voltage response of what's happening at the end of feeder. Now, from a regulatory 198 00:19:16,440 --> 00:19:25,760 standpoint, I have to maintain 114 to 127 volts, but there is this process called conservation 199 00:19:25,760 --> 00:19:31,280 voltage reduction, which we artificially lower the voltage on the system. And what that does 200 00:19:31,280 --> 00:19:36,600 for us is that reduces actually the amount of power we have to purchase during that timeframe. 201 00:19:36,600 --> 00:19:41,960 So we like to keep our four CP days low. And so this is when we typically use this program 202 00:19:41,960 --> 00:19:50,440 is yes, sir. What is a CP day? Coincident peak day. Thank you. Yes. So this is an artificial 203 00:19:50,440 --> 00:19:56,240 lowering of the voltage during that time. And what this item likes allows us to do is 204 00:19:56,240 --> 00:20:03,260 have real time input coming in back to the system. So the folks in the operations operations 205 00:20:03,260 --> 00:20:07,680 area are watching the voltage constantly, making sure we don't violate anything. Now, 206 00:20:07,680 --> 00:20:12,120 even though I can go down to 114 volts, we keep it at 116. We had that safety factor 207 00:20:12,120 --> 00:20:16,680 in there. So what happens if they see anything going below 116, they'll actually jack the 208 00:20:16,680 --> 00:20:21,200 voltage back up at the substation. So what we want to do is we've, we put this on six 209 00:20:21,200 --> 00:20:26,960 feeders and we had a, um, we had a proof of concept and what we're based upon the savings 210 00:20:26,960 --> 00:20:32,680 that we saw with proof of concept, we're expecting that with this at $500 per megawatt hour, we 211 00:20:32,680 --> 00:20:37,960 could save about $383,000 per year. So within a couple of years, we've paid for this project 212 00:20:37,960 --> 00:20:43,360 just for that standpoint. Um, that number that you came up with is based on current 213 00:20:43,360 --> 00:20:50,120 rates. Yes. Based on current and project. Well, based on energy rates. Um, what I'm 214 00:20:50,120 --> 00:20:53,920 talking about is what we're being charged through the ERCOT system. It's not really 215 00:20:53,920 --> 00:20:59,600 based on the living sense average that we pay or customers pay for kilowatt hour. It's 216 00:20:59,600 --> 00:21:03,760 not based on that. That's, that's always going to be a variable, but that's a good point 217 00:21:03,760 --> 00:21:08,520 because that's something that we're working on right now, adding into the equation. Um, 218 00:21:08,520 --> 00:21:14,240 we're at 11 cents per kilowatt hour. That's about $110 per megawatt hour. So there's some 219 00:21:14,240 --> 00:21:18,840 logic that if you go above that $110, we're not making any more money. In fact, we're 220 00:21:18,840 --> 00:21:23,360 losing money. So you start lowering the voltage to start saving even more money. So our folks 221 00:21:23,360 --> 00:21:28,240 in our EMO are developing lack of a better term, a widget right now to make sure all 222 00:21:28,240 --> 00:21:31,720 the buys and sales and everything are equating. And hopefully there'll be a signal that'd 223 00:21:31,720 --> 00:21:37,440 be sent out to our folks in the operations center to turn the system on. Again, we've 224 00:21:37,440 --> 00:21:41,080 only got a small system in place right now. We're going to try to do it to a full system 225 00:21:41,080 --> 00:21:45,160 place. Uh, we've got it over the next three years. It looks like we're planning on spending 226 00:21:45,160 --> 00:21:49,560 about $62,000 over the next three years to implement these. So we're going to do about 227 00:21:49,560 --> 00:21:55,160 30 feeders or so a year, a hundred feeders maximum. Okay. So once you get to the hundred 228 00:21:55,160 --> 00:22:01,120 meters and you feel like you're going to have a pretty good, um, overview of current consumption 229 00:22:01,120 --> 00:22:05,880 and the rate of growth of consumption so that you can make that adjustment. Yeah. And, and 230 00:22:05,880 --> 00:22:09,280 the other thing that's going to be happening during this timeframe is we're, we're having 231 00:22:09,280 --> 00:22:13,960 RFP and you guys will see it pretty soon for a advanced distribution management system 232 00:22:13,960 --> 00:22:19,080 that will make the management of this system much more automated and keep a lot better 233 00:22:19,080 --> 00:22:23,120 detail and a record for us to understand what the actual savings is and everything else 234 00:22:23,120 --> 00:22:27,000 that we've got going on on the system out there. So it's a really good system. It's, 235 00:22:27,000 --> 00:22:31,600 I mean, people have been doing CVR for probably a couple of decades now, so it's not a new 236 00:22:31,600 --> 00:22:36,760 phenomenon. Uh, we're just now starting to introduce it here to DME. So first you're 237 00:22:36,760 --> 00:22:42,960 going to introduce it, implement it, introduce it and have an operating maybe manually and 238 00:22:42,960 --> 00:22:46,840 then down the road, you're intending to make it a more automated process that I understand 239 00:22:46,840 --> 00:22:50,920 that correctly. Yes, sir. Yes, sir. In other words, the ADMS system will watch all this 240 00:22:50,920 --> 00:22:55,520 stuff and hopefully have an input coming in from the EMO. And when that input comes in, 241 00:22:55,520 --> 00:23:00,520 it starts doing everything itself automatically to lower those, that power consumed. Very 242 00:23:00,520 --> 00:23:12,560 good. Thank you. If there's no further, we entertain a motion to approve this item. I'll 243 00:23:12,560 --> 00:23:18,920 give you a second Lee. All those in favor, please say aye. Aye. Aye. Any opposed? Thank 244 00:23:18,920 --> 00:23:31,760 you. Okay. So do I need to go to closed now or do I? I believe we do because I think any 245 00:23:31,760 --> 00:23:37,040 questions related to those items will be confidential. So we would call the closed, um, under the 246 00:23:37,040 --> 00:23:41,880 competitive matters. We'll just pull it up ahead of the schedule. Okay. Uh, yes. And 247 00:23:41,880 --> 00:23:47,720 then to vote on the items, we'll have to come out of class. Okay. I will convene the closed 248 00:23:47,720 --> 00:23:52,480 session at nine 24. We will consider the following items deliberations regarding certain public 249 00:23:52,480 --> 00:24:00,280 power utilities, competitive matters under Texas government code section 551.086 consultation 250 00:24:00,280 --> 00:24:15,520 with attorneys under Texas government code section 551.071. Okay. We're back in open 251 00:24:15,520 --> 00:24:25,840 session. It is 1004 a.m. Um, first thing we need to do is vote on the consent item B that 252 00:24:25,840 --> 00:24:30,920 was pulled that we discussed in closed session. Anybody like to make a motion to approve motion 253 00:24:30,920 --> 00:24:37,800 to approve? Second. Okay. We have been and then Lee any further discussion? There doesn't 254 00:24:37,800 --> 00:24:47,060 appear to be any. So all those in favor, please say aye. Aye. Any opposed? Okay. Uh, we discussed 255 00:24:47,060 --> 00:24:54,760 do we need, we need to take action on item a from the closed meeting. We don't. Okay. 256 00:24:54,760 --> 00:25:04,680 Just discussion. Gotcha. Then we'll move into our work session. For individual consideration. 257 00:25:04,680 --> 00:25:10,240 Oh, yeah, I forgot about that. Sorry. Okay. That's that you, David today on items for 258 00:25:10,240 --> 00:25:20,240 individual other than consider approval of the minutes. June 27 2022. That's me. Move 259 00:25:20,240 --> 00:25:29,680 approval. Second. Please say aye. Aye. Okay. Management reports. Great. Good morning, board. 260 00:25:29,680 --> 00:25:33,840 We have the deck dashboard. You can see there for March 2022. I always have a number of 261 00:25:33,840 --> 00:25:37,600 me and me staff here to answer any questions you may have on the dashboard. You also see 262 00:25:37,600 --> 00:25:42,600 that future agenda items and the new business action items. So, um, are there any questions 263 00:25:42,600 --> 00:25:50,600 on the dashboard? Sure. Right back. I have one. It's this appears to only be for the 264 00:25:50,600 --> 00:25:56,960 first quarter, January through March. Correct. Yeah. Well, the second quarter of fiscal year, 265 00:25:56,960 --> 00:26:02,320 first quarter of the calendar year. Yes. However you want to put it, we are in July. I was 266 00:26:02,320 --> 00:26:08,120 surprised we didn't have second quarter or or we didn't have the next quarter's information. 267 00:26:08,120 --> 00:26:13,560 Right. It takes a little time for accounting to get everything finalized. So this is typical 268 00:26:13,560 --> 00:26:25,120 for our kind of lag timing. Okay. Thank you. Yeah. Here to anything further on that item. 269 00:26:25,120 --> 00:26:33,520 Future agenda items. Anyone? Doesn't appear to be there either. Lucky y'all new business 270 00:26:33,520 --> 00:26:39,160 action items. You can see the listed there. We still have number two listed. That was 271 00:26:39,160 --> 00:26:44,320 obviously complete with the procurement discussion at the last meeting, I believe. Um, we talked 272 00:26:44,320 --> 00:26:49,000 about the one meeting versus two meetings a month and we still have one outstanding item 273 00:26:49,000 --> 00:26:59,680 anything further doesn't appear to be. So under concluding items, we can now go into 274 00:26:59,680 --> 00:27:04,080 our work session. Receive a report, hold a discussion to give staff direction on proposed 275 00:27:04,080 --> 00:27:11,920 water, wastewater, solid waste and electric rates for FYI 20 22 23. Good morning, Chair 276 00:27:11,920 --> 00:27:16,040 P even members, Nick Vinson, assistant director of finance. I'm gonna do my best to speak 277 00:27:16,040 --> 00:27:23,920 up as loud as possible without yelling at you. So if I start yelling, just let me know. 278 00:27:23,920 --> 00:27:32,240 So. Okay. So before we get started, just kick it off. We have two presentations for you 279 00:27:32,240 --> 00:27:37,480 today. The first presentation will summarize the rate changes for the utilities, the ones 280 00:27:37,480 --> 00:27:42,680 that we are proposing this year. After this presentation, we will have a financial discussion 281 00:27:42,680 --> 00:27:47,680 for the electric fund. Uh, we'll talk to you about electric a little bit. So for the rate 282 00:27:47,680 --> 00:27:52,320 presentation, just a really quick overview. Um, you can see we'll talk about the rate 283 00:27:52,320 --> 00:27:57,120 change history. We'll look at some water wholesale rates that we adjust annually as part of the 284 00:27:57,120 --> 00:28:01,040 budgeting process. And then we'll look at some proposed wastewater and solid waste rate 285 00:28:01,040 --> 00:28:10,880 changes. Okay, so we show this each year as part of the budgeting process. We are proud 286 00:28:10,880 --> 00:28:15,560 of this. It shows some rate history. So for any new PB members that may not have seen 287 00:28:15,560 --> 00:28:21,960 it before, I'll walk you through it. Um, so you can see from fiscal year 2016 to 2023, 288 00:28:21,960 --> 00:28:27,700 any rate changes for the utilities. Um, you can see rate increases here and rate decreases. 289 00:28:27,700 --> 00:28:32,600 You can see the last year we had rate increases for residential or commercial customers and 290 00:28:32,600 --> 00:28:38,240 the utilities was fiscal year 2017. Uh, since 2017, we've actually had some rate decreases 291 00:28:38,240 --> 00:28:45,680 in 2018 through 2021. Um, last couple of years, we have kept rates the same. I know this was 292 00:28:45,680 --> 00:28:48,720 something we discussed during the last couple of meetings about possible rate changes in 293 00:28:48,720 --> 00:28:52,560 the future, but we're not looking to make any increases to residential or commercial 294 00:28:52,560 --> 00:29:01,000 rates this year. So I just want to make sure I pointed that out to the PB. So water wholesale 295 00:29:01,000 --> 00:29:05,600 rates, um, these are only two rates we're looking to change in the water utility. Uh, 296 00:29:05,600 --> 00:29:10,040 like I'd said earlier, these do update annually as part of the budgeting process. Uh, so the 297 00:29:10,040 --> 00:29:15,760 first one being our wholesale raw water rate. Uh, this is, it's set at 85% of the Dallas 298 00:29:15,760 --> 00:29:20,400 wholesale rate for water. Uh, so this is currently not available, but we did want to bring it 299 00:29:20,400 --> 00:29:24,440 to your attention that we will update this. And this is a contractual agreement that we 300 00:29:24,440 --> 00:29:29,040 have that this rate does change annually. Um, the next one is there are raw water pass 301 00:29:29,040 --> 00:29:32,960 through rate, uh, which is currently before you move on. I apologize. Oh, I'm sorry. I 302 00:29:32,960 --> 00:29:40,200 didn't. Um, so are we actually selling this raw water at these rates? And if so, in general 303 00:29:40,200 --> 00:29:47,120 terms to whom, um, probably asked Steven to speak to who we sell the water to. Um, I know 304 00:29:47,120 --> 00:29:57,800 we do sell some at these rates, but let me let him speak to the customers. Thank you. 305 00:29:57,800 --> 00:30:02,960 Good morning. Uh, Steven gay director of water utilities. Yes, we do sell water to the opportunity 306 00:30:02,960 --> 00:30:08,440 water, uh, regional water district, and we use these rates for the raw water. 307 00:30:08,440 --> 00:30:30,720 Thank you. Yep. So do they like take from the lake directly or do we pump water to them? 308 00:30:30,720 --> 00:30:34,160 They have their own intake. Okay. And that would be all the raw water wholesale. Raw 309 00:30:34,160 --> 00:30:39,920 water would probably be somebody who buys just directly out of the lake or river. Okay. 310 00:30:39,920 --> 00:30:51,640 Thank you. Yes, sir. Any other questions? Okay. All right. Does anybody else have questions 311 00:30:51,640 --> 00:30:58,440 on water? If not, I will move forward. Okay. Um, so wastewater changes looking to make 312 00:30:58,440 --> 00:31:03,560 some changes to our dino dirt rates. Um, these are cost of service based adjustments. Just, 313 00:31:03,560 --> 00:31:08,200 um, the price of material using to produce this product has gone up. So we are looking 314 00:31:08,200 --> 00:31:14,560 to make some increases. The first one being for the pure cubic yard rates of bulk material 315 00:31:14,560 --> 00:31:20,480 would increase from 25 to 30 this coming year. And then also we sell bags material. We started 316 00:31:20,480 --> 00:31:23,920 this a couple of fiscal years ago. You may remember we are looking to increase those 317 00:31:23,920 --> 00:31:35,000 bags from four to $5. So solid waste, we have a few new rates we're looking to introduce 318 00:31:35,000 --> 00:31:40,400 and then increasing, uh, maybe an existing rate for unsecured load. So I'll start at 319 00:31:40,400 --> 00:31:44,660 the top here, walk you down the list. If you have questions, Eugene is here. He'll be happy 320 00:31:44,660 --> 00:31:48,880 to answer, but I definitely get us through the rates part of it. So the first one is 321 00:31:48,880 --> 00:31:54,680 an RFID replacement card. We are looking to implement this year. This is new. Uh, this 322 00:31:54,680 --> 00:31:58,160 would be issued to people that routinely visit the landfill and it would recognize their 323 00:31:58,160 --> 00:32:06,560 vehicle. So, um, that's what this rate is for. Um, the first one is, uh, sorry, go ahead. 324 00:32:06,560 --> 00:32:16,160 Um, it is, it's almost like a, I'm trying to think what that stands for. Yeah, absolutely. 325 00:32:16,160 --> 00:32:22,520 That's, did you hear that? Radio frequency identification. Yeah. Yeah. Yeah, we should 326 00:32:22,520 --> 00:32:27,320 have spelled that out here. Um, the, the next one is the unsecured load. So currently we 327 00:32:27,320 --> 00:32:32,880 do charge customers that come into the landfill facility without a cover, a $20 fee. We are 328 00:32:32,880 --> 00:32:37,360 looking to increase that to 25. Uh, when they do pay that fee, they would be issued a tarp 329 00:32:37,360 --> 00:32:42,320 and some bungee cords to secure their loads. So just wanted to point that out. Uh, we are 330 00:32:42,320 --> 00:32:47,860 looking to implement a second or a subsequent unsecured load fee of $30. I mean, you can't 331 00:32:47,860 --> 00:32:53,720 see that for you right here. And then looking to, um, implement a wait ticket rate. So for 332 00:32:53,720 --> 00:32:58,480 non-cited vehicles of $5. So someone wants their vehicle weighed, we would charge them 333 00:32:58,480 --> 00:33:05,440 a rate for that service. Um, the live load fee minimum of 15 minute charge is $75 an 334 00:33:05,440 --> 00:33:10,420 hour with a minimum of 15 minutes. Uh, we are looking to implement this year. If a driver 335 00:33:10,420 --> 00:33:15,360 has to wait for a customer to load a container, that's what this fee would be for. Then Barbara, 336 00:33:15,360 --> 00:33:20,600 did you have a question? No, I, you, you answered that. I was going to ask what a live load 337 00:33:20,600 --> 00:33:26,440 would be. And then, uh, construction and demolition rate is $65 a ton. I know Brian had talked 338 00:33:26,440 --> 00:33:30,600 to the solid waste comprehensive plan earlier. This does go hand in hand with this trying 339 00:33:30,600 --> 00:33:34,760 to divert that material. So I want to make sure we pointed that out. Um, the shingles 340 00:33:34,760 --> 00:33:40,240 rate is $125 a ton. We are looking to implement a shingles rate. It is a hard material to 341 00:33:40,240 --> 00:33:44,240 handle at the landfill. I know Eugene can talk to it more, but we are looking to get 342 00:33:44,240 --> 00:33:49,560 this in rate ordinance. Yeah. I have a question about that. Yeah. So is it, is it actually 343 00:33:49,560 --> 00:33:52,880 something you're processing there or you're hiring somebody to process or are you shipping 344 00:33:52,880 --> 00:34:07,040 that shingles, the shingles off? Let me ask Eugene to explain their current process. Good 345 00:34:07,040 --> 00:34:10,960 morning board members. My name is Eugene McKenna. I'm deputy director of solid waste recycling. 346 00:34:10,960 --> 00:34:15,840 I believe the question is, are we processing it there? Yeah. Are you processing it there 347 00:34:15,840 --> 00:34:22,440 or are you shipping it off or what? No, currently it comes in and it's landfilled. It's landfilled. 348 00:34:22,440 --> 00:34:28,200 Just raw like it comes in. And it's raw. And the strategy will help us identify processors 349 00:34:28,200 --> 00:34:34,840 for this. Um, you know, when you materials like shingles and C and D, you know, when 350 00:34:34,840 --> 00:34:39,800 you landfill it, you know, the byproduct is methane, right? This creates nothing. It just 351 00:34:39,800 --> 00:34:44,360 takes up space in the landfill. So we're talking about some diversion opportunities. 352 00:34:44,360 --> 00:34:48,960 So that's where we're at with that. Okay. And so these, these are any, these are always 353 00:34:48,960 --> 00:34:55,620 tear offs I would imagine, right? They're not, they're not rejects from the manufacturer. 354 00:34:55,620 --> 00:35:01,440 I've never seen that normally, you know, a roofing job and things come in like that, 355 00:35:01,440 --> 00:35:06,760 but I've never seen a load of more like rejects. Shingles are recycled into some other product, 356 00:35:06,760 --> 00:35:13,240 you know, asphalt and, and absolutely. And the plan will help us identify these companies 357 00:35:13,240 --> 00:35:19,360 that will possibly come here and we can find locally that'll help, you know, recycle it. 358 00:35:19,360 --> 00:35:22,120 So it gets another life somewhere other than just landfill. Another part of the strategy 359 00:35:22,120 --> 00:35:30,840 then. Okay. Absolutely. Okay. Cool. Thank you. This $75, I'm sorry, $125 a ton. Are we going 360 00:35:30,840 --> 00:35:36,080 to get that from site a single house? Is there a ton of shingles on one house torn off or 361 00:35:36,080 --> 00:35:40,760 is that just a minimum rate no matter what they bring in? Well, that's the minimum what 362 00:35:40,760 --> 00:35:48,440 they bring in. Okay. So it's under a ton. Okay. Yes. Thanks. Yes, sir. Since these are 363 00:35:48,440 --> 00:35:55,760 proposed for upcoming year, what kind of a total budget impact are we anticipating from 364 00:35:55,760 --> 00:36:03,480 these new fees? Well, not sure if that's a Nick question, that he's got all the money 365 00:36:03,480 --> 00:36:14,280 in his pocket. Yes, sir. Thank you. I don't have the exact number right now, Mr. Rybak. 366 00:36:14,280 --> 00:36:18,880 These are included in the proposed budget that you saw already, but I would think the total 367 00:36:18,880 --> 00:36:22,800 impact would be minimal, but we can get that number to you. I don't, I don't have it today 368 00:36:22,800 --> 00:36:32,840 though. Thank you. Appreciate it. You're welcome. Okay. We will continue on. So won't go through 369 00:36:32,840 --> 00:36:36,680 the calendar again with you. You've seen it again. So next PV meeting, we will be seeking 370 00:36:36,680 --> 00:36:42,240 your approval for each of the operating budgets for the utilities and the rates. We are scheduled 371 00:36:42,240 --> 00:36:51,920 to present those to city council next Tuesday. So that concludes this presentation. Nick, 372 00:36:51,920 --> 00:36:55,480 if I could jump in real quick, I know Nick had that slide at the beginning talking about 373 00:36:55,480 --> 00:36:58,080 our rates over the past five years, and we talked about it a little bit in the budget 374 00:36:58,080 --> 00:37:02,480 presentations last year, but I just don't want it to be lost as we have these discussions, 375 00:37:02,480 --> 00:37:07,200 the fact that we don't have rate increases again this year across utilities. If you just 376 00:37:07,200 --> 00:37:12,920 look at articles right now, MOUs out in Texas, especially on the electric side, rates are 377 00:37:12,920 --> 00:37:17,160 just increasing for everyone. So it's a really achievement from the staff, from everyone that 378 00:37:17,160 --> 00:37:25,360 we have another year of rate increases. So just want to point that out again. All right. 379 00:37:25,360 --> 00:37:30,680 And then Billy, that's this item. You may want to call the next item if you don't mind 380 00:37:30,680 --> 00:37:37,520 for the electric presentation. Oh, it is another item. Sorry. Yes, sir. Okay. Item work session 381 00:37:37,520 --> 00:37:42,040 item B, receive a report, hold a discussion, and give staff direction regarding the electric 382 00:37:42,040 --> 00:37:48,440 FY 22-23 preliminary budget, capital improvement program, and five-year financial forecast. 383 00:37:48,440 --> 00:37:53,320 Okay. So Nick Vinson again, Assistant Director of Finance, walking through the electric budget 384 00:37:53,320 --> 00:37:57,920 presentation. We have removed the operational slides from this presentation. If you have 385 00:37:57,920 --> 00:38:01,560 an operational question, of course, there's plenty of DME people would be happy to speak 386 00:38:01,560 --> 00:38:05,320 to it. But we'll walk us through the financials, explain some updates that we've had since 387 00:38:05,320 --> 00:38:14,780 the last time we talked to you, and then answer any questions that you may have. So this is 388 00:38:14,780 --> 00:38:19,280 really just an overview of the presentation. We will talk about the pro forma. We'll look 389 00:38:19,280 --> 00:38:23,060 at the pro forma together. I'll point out some changes. We'll look at that fund balance 390 00:38:23,060 --> 00:38:29,320 and look at some operating expenses. The capital budget, we did talk in great detail last meeting. 391 00:38:29,320 --> 00:38:32,660 If you remember about the capital budget, we'll just hit on it in this presentation 392 00:38:32,660 --> 00:38:38,700 with one slide. So if you have questions or want to see a more detailed capital budget, 393 00:38:38,700 --> 00:38:41,960 please refer to that book that was submitted to you last time, and we're happy to provide 394 00:38:41,960 --> 00:38:49,000 it again if you can't find it. So financial assumptions, we saw this at the last meeting, 395 00:38:49,000 --> 00:38:52,760 but just walk you through really quick. So the forecast is based on retail sales, which 396 00:38:52,760 --> 00:38:59,080 is megawatt hours. You can see the MWH. Revenue projections of 2 to 3 percent increase, which 397 00:38:59,080 --> 00:39:03,120 is consistent across the utilities, something we talked about several times over the last 398 00:39:03,120 --> 00:39:07,920 couple meetings. Expenses, we do have the ROI, so the return on investment going to 399 00:39:07,920 --> 00:39:12,000 the general fund remaining at 6 percent. I believe we discussed that last time, but I 400 00:39:12,000 --> 00:39:17,200 wanted to point that out just in case. The TMRS rate, which is the Texas Municipal Retirement 401 00:39:17,200 --> 00:39:24,520 System, that rate increasing from 17.65 to 18.15. So that's something we were notified 402 00:39:24,520 --> 00:39:29,160 through our last meeting that we updated on this pro forma. The capital budget, we did 403 00:39:29,160 --> 00:39:34,160 change one project that was previously submitted to you. We removed the DME backup center from 404 00:39:34,160 --> 00:39:39,880 the capital budget. So that is no longer reflected in here. And then the summer and winter outage 405 00:39:39,880 --> 00:39:45,320 insurance premium increase of 900,000. So that was a pretty fairly large increase. We 406 00:39:45,320 --> 00:39:50,600 wanted to make sure we pointed that out to you. Mr. Ryback, yes, sir? 407 00:39:50,600 --> 00:39:55,920 Yes, I was curious about removing the DME backup center. Is it something that's going 408 00:39:55,920 --> 00:40:00,880 to come up then in the future year? So let me ask Mr. Filder, probably the best 409 00:40:00,880 --> 00:40:11,080 one to talk about that. Yes, sir. Excuse me. Yes, sir, we did remove 410 00:40:11,080 --> 00:40:20,560 it. Other options came out, like maybe spreading this out to kind of an offsite deal or contracting 411 00:40:20,560 --> 00:40:26,000 this service out to other folks. That way we can have a little bit of geographical distance 412 00:40:26,000 --> 00:40:29,640 between Ditten and wherever the backup data center is. So we're going to hand it back 413 00:40:29,640 --> 00:40:32,080 to the budget at this time. Thank you. 414 00:40:32,080 --> 00:40:36,720 I would also add to that DME has worked closely with tech services on thinking through the 415 00:40:36,720 --> 00:40:41,160 best options, as you already mentioned. So really worked together to come up with different 416 00:40:41,160 --> 00:40:46,640 ways to provide the service. Provide that. Gotcha. Thank you. 417 00:40:46,640 --> 00:40:52,640 Okay, I will keep going. So supplemental requests, those new initiatives or new positions being 418 00:40:52,640 --> 00:40:57,840 requested by this utility, 1.8 million, and I'll point those out to you on the pro forma 419 00:40:57,840 --> 00:41:02,760 here shortly. And then you can see the positions that make up the majority of that amount, 420 00:41:02,760 --> 00:41:06,240 11 FTEs this coming fiscal year, and you can see them listed out here at the bottom of 421 00:41:06,240 --> 00:41:13,080 the slide. Okay, so the five-year forecast for the electric 422 00:41:13,080 --> 00:41:17,480 utility, as I mentioned last time, we do plan in a 10-year window. We are showing you five 423 00:41:17,480 --> 00:41:21,360 years here. Just with those purchase power expenses, the further you get out, the less 424 00:41:21,360 --> 00:41:24,440 accurate it becomes. So we're showing you five years here, but just want to point out 425 00:41:24,440 --> 00:41:28,400 that we do have a 10-year pro forma. So the adopted budget, so the current fiscal year 426 00:41:28,400 --> 00:41:35,600 that we are in here, you can see the revenues that we included in the budget of 245.7 million. 427 00:41:35,600 --> 00:41:42,080 Expenses of 240.7, so net income of 5 million or 4.9. Going into the end of your estimate, 428 00:41:42,080 --> 00:41:48,560 you can see revenues of 308.5 and expenses of 291 million. So one thing I did want to 429 00:41:48,560 --> 00:41:52,760 point out, I know there's been a lot of conversation with Terry today about the energy market today 430 00:41:52,760 --> 00:41:57,800 and the pricing of such. This pro forma does not reflect those prices, so we will update 431 00:41:57,800 --> 00:42:00,680 this and we can always bring it back to you in the future to update you for the end of 432 00:42:00,680 --> 00:42:04,840 your estimate. So there is a good possibility that the electric utility will need a budget 433 00:42:04,840 --> 00:42:09,280 amendment this fiscal year to accommodate those energy purchases, so just wanted to make 434 00:42:09,280 --> 00:42:17,440 sure I said that. Fiscal year 2023, you can see here what we're proposing, so 399.9 million 435 00:42:17,440 --> 00:42:25,760 in revenue, that makes that number right here. Expenses of 415.9, so showing the increase 436 00:42:25,760 --> 00:42:30,840 in energy purchases, also associated with the data center. So we talked about the data 437 00:42:30,840 --> 00:42:34,560 center last time being included, which has increased the revenue and expenses for this 438 00:42:34,560 --> 00:42:46,200 upcoming fiscal year. Yes, sir. So what's our current requirement for operating reserve? 439 00:42:46,200 --> 00:42:50,440 What percentage are we supposed to be keeping? Great question. So we looked at it last year 440 00:42:50,440 --> 00:42:55,640 and actually revised it. I'm sure you remember that the 46% is the minimum and 69% is the 441 00:42:55,640 --> 00:43:00,640 max that we'd like to see in there. And then it's down here, Billy, to answer your question. 442 00:43:00,640 --> 00:43:08,160 So what does 46% equate to? It's 126.2 and then 189 million for the top. So you can see 443 00:43:08,160 --> 00:43:19,680 we're currently at 120.9, is what we're forecasting. Good. That's great. And of course, Mr. Rybeck. 444 00:43:19,680 --> 00:43:24,720 You anticipated. Well, I kind of got the side view, I thought you were reaching for it. 445 00:43:24,720 --> 00:43:28,560 Well thank you for that. I'm having a little trouble trying to look at the numbers here 446 00:43:28,560 --> 00:43:38,640 on my iPad. So is the non-debt service the $37 million number from '21? And the debt 447 00:43:38,640 --> 00:43:47,320 is the $17 million or is the debt the no cost? No, the debt service is 17.2 in 2021. And 448 00:43:47,320 --> 00:43:52,840 then non-debt, so for those other infrastructure assets that we have, is 37. Yeah. Well, my 449 00:43:52,840 --> 00:43:58,480 question actually is about the debt. It appears to be fairly static over the pro forma form. 450 00:43:58,480 --> 00:44:03,960 Is there a time frame at which that's going to run out or will we be done paying for it 451 00:44:03,960 --> 00:44:12,360 in 10 years, 20 years, seven years, or does anyone know for sure? Do you know the? There 452 00:44:12,360 --> 00:44:18,080 was 30 year debt. I'm not so exact. Probably about 28 years left or 27. I'm at the top 453 00:44:18,080 --> 00:44:23,120 of my head. Thank you. Yeah. We can get that date to you. Not terribly important. I was 454 00:44:23,120 --> 00:44:28,040 just captured by curiosity that it seemed to be pretty static. I was like, okay, that's 455 00:44:28,040 --> 00:44:33,000 long term debt. So I wondered what the time frame. It actually is 20 year debt because 456 00:44:33,000 --> 00:44:38,240 we did revenue bonds for that. So it's about 17 years, I would guess, left on that. Okay. 457 00:44:38,240 --> 00:44:43,400 So that's from, that's the debt repayment for the bond. Correct. Thank you. Yeah. For 458 00:44:43,400 --> 00:44:55,080 the construction of that facility. Yeah. Okay. Perfect. So the T cost is still based on 30 459 00:44:55,080 --> 00:45:00,320 year debt no matter how we structure our own debt, right? Well, that's part of the discussion 460 00:45:00,320 --> 00:45:06,120 we're having right now as we go through the rate case, but it is tied to that. Okay. That's 461 00:45:06,120 --> 00:45:12,400 probably closed session. Yeah. Sorry. Yeah. I was looking at David for that one. I was 462 00:45:12,400 --> 00:45:19,120 like, I don't know how you want to answer it. Okay. So the forecast here, so 0% rate increases 463 00:45:19,120 --> 00:45:23,400 for this year. I just wanted to mention, you know, in the future if purchase power expenses 464 00:45:23,400 --> 00:45:27,120 do stay the way we're seeing them currently, we may have to talk about the rate structure 465 00:45:27,120 --> 00:45:31,720 with the PV next year and that ECA rate. So just wanted to mention that it is reflected 466 00:45:31,720 --> 00:45:36,440 on the pro forma here, but just wanted to put that out there for you. So I'll move on 467 00:45:36,440 --> 00:45:42,200 unless you have questions. So the capital budget really high level here. Like I said, 468 00:45:42,200 --> 00:45:46,460 we got into the detail of it last meeting, but just wanted to recap it really quick since 469 00:45:46,460 --> 00:45:53,000 we removed that data center project. So 72.9 million in debt funded projects, revenue funding 470 00:45:53,000 --> 00:45:57,760 about 1.1, aid in construction. So from some contributions from different projects around 471 00:45:57,760 --> 00:46:08,240 the city for 79.7 million in 2023. And here is a summary and how it breaks out into the 472 00:46:08,240 --> 00:46:13,640 different categories. So we do put it into categories to help us with tracking and some 473 00:46:13,640 --> 00:46:18,380 of our T cost return items. So we just wanted to be sure to point it out. So you can see 474 00:46:18,380 --> 00:46:24,600 we do have several different things here. Distribution substations, distribution transformers, 475 00:46:24,600 --> 00:46:28,600 some new residential commercial budgeted and then you can see transmission down here at 476 00:46:28,600 --> 00:46:37,800 the second portion of the table for 28.2. And this is the table or the calendar. I won't 477 00:46:37,800 --> 00:46:41,120 go through it again with you, but it is here for your reference. And that is the end of 478 00:46:41,120 --> 00:46:52,080 the presentation. Any questions on electric? >> Do you have a question, Barbara? Your lights 479 00:46:52,080 --> 00:46:58,440 on. That's why I'm asking. No? Okay. Anyone? I think we got them all out. Thank you. 480 00:46:58,440 --> 00:47:02,800 >> Perfect. Thank you. >> That's all we have today. And for the first 481 00:47:02,800 --> 00:47:09,120 time I'm going to let somebody else make the motion to adjourn. Mr. Beck, we're all in. 482 00:47:09,120 --> 00:47:13,600 I think that's all it requires anyway.