WEBVTT

00:00:00.000 --> 00:00:08.460
 good afternoon and welcome to the city of Denton's planning and zoning

00:00:08.460 --> 00:00:14.760
 Commission meeting for Wednesday April 27th 2022 this is our work session and

00:00:14.760 --> 00:00:19.320
 with a quorum present I will call us to order at 430 p.m. let their record show

00:00:19.320 --> 00:00:25.160
 at this time Commissioner Anderson is absent going through our agenda first

00:00:25.160 --> 00:00:29.600
 item is citizen comments on a consent agenda however we have no consent

00:00:29.600 --> 00:00:34.880
 agenda so we're gonna move on to our next work session item which is our work

00:00:34.880 --> 00:00:42.760
 session reports first one is 2a pz 22079 we'll bring up Charlie to present hi

00:00:42.760 --> 00:00:50.000
 Charlie hey glad to be back and able to present to the planning and zoning

00:00:50.000 --> 00:00:53.200
 Commission good evening my name is Charlie Rosendahl I'm the business

00:00:53.200 --> 00:00:59.180
 services manager for the development services department here I'm here to

00:00:59.180 --> 00:01:04.800
 talk to you today about a work session item that came before as a council

00:01:04.800 --> 00:01:10.760
 request about a weekly automated notification an opt-in notification for

00:01:10.760 --> 00:01:15.360
 development projects this started out as an item as you all know on the P&Z

00:01:15.360 --> 00:01:20.240
 matrix and then it came forward as a two-minute pitch with City Council in

00:01:20.240 --> 00:01:27.680
 January I just want to give a brief background on how we currently notify in

00:01:27.680 --> 00:01:33.280
 the city of Denton we send mailed notices to owners within 200 foot of the

00:01:33.280 --> 00:01:38.440
 development and then also publish a notice in the local paper and that's per

00:01:38.440 --> 00:01:43.960
 state law on top of that the city of Denton sends 500 foot postcards to

00:01:43.960 --> 00:01:48.720
 residents and then signs are posted on the property and we post public

00:01:48.720 --> 00:01:55.100
 hearings on the city's website as a reminder applicants pay the cost of the

00:01:55.100 --> 00:02:02.420
 mailings and newspaper notifications following that additionally we have some

00:02:02.420 --> 00:02:07.600
 online sources of information about development projects so we have an active

00:02:07.600 --> 00:02:11.640
 projects map that shows all of the current active projects in the city and

00:02:11.640 --> 00:02:17.560
 then we also have a separate weekly project map that shows just the the last

00:02:17.560 --> 00:02:24.520
 week submittals lastly we have a project information webpage which is a walk

00:02:24.520 --> 00:02:29.620
 through site on how somebody can look at a development in the city it'll it'll

00:02:29.620 --> 00:02:33.280
 tell them how to go to the active projects map what to click on how to go

00:02:33.280 --> 00:02:42.280
 on our public meeting site and and look at the background information there so

00:02:42.280 --> 00:02:48.480
 again the ask was for a opt-in notification system that citizens could

00:02:48.480 --> 00:02:54.000
 opt-in and be alerted of notification area of new developments so what staff

00:02:54.000 --> 00:03:00.240
 is proposing here is a solution based in our active projects map since that's the

00:03:00.240 --> 00:03:04.880
 one that currently holds all of our project data what we're proposing is an

00:03:04.880 --> 00:03:11.680
 online signup form and then our GIS staff would create a buffer distance

00:03:11.680 --> 00:03:16.800
 based on what people select in that signup form and then at the time that

00:03:16.800 --> 00:03:21.560
 we're creating these projects we would cross reference a new project in that

00:03:21.560 --> 00:03:26.040
 buffer distance and have a tailored notification that goes out to somebody

00:03:26.040 --> 00:03:30.440
 I'm telling them exactly what the project name is where it's at and then

00:03:30.440 --> 00:03:34.280
 in the email template that we send them out we would also provide where they can

00:03:34.280 --> 00:03:40.800
 find more information on that and then if you were just looking at the

00:03:40.800 --> 00:03:46.360
 screenshot here it's just asking for a name email address and address and then

00:03:46.360 --> 00:03:51.280
 the distance that they want to be notified so we could custom that to if

00:03:51.280 --> 00:03:57.200
 you want a 500 foot notice if you want quarter mile whatever a specific buffer

00:03:57.200 --> 00:04:01.280
 distance that somebody would want is yeah I guess I have a question with that

00:04:01.280 --> 00:04:08.000
 particular the way it's worded in feet is there any way to maybe alter that at

00:04:08.000 --> 00:04:14.040
 all sure I don't know if maybe something within so much distance to their address

00:04:14.040 --> 00:04:17.200
 that they put in I don't know it just would be for somebody who wants to be

00:04:17.200 --> 00:04:22.000
 informed of kind of projects all over I'm not sure what they would put there

00:04:22.000 --> 00:04:27.120
 okay I mean thousands of feet you know what I mean it just seems that seems odd

00:04:27.120 --> 00:04:32.160
 for the just kind of the regular person yeah I know it's seemingly how we do

00:04:32.160 --> 00:04:37.720
 notices but it seems like for like the general public that seems like we could

00:04:37.720 --> 00:04:41.920
 probably know I appreciate that we could probably do some type of a drop-down

00:04:41.920 --> 00:04:46.480
 system that gives maybe a few options and then another and yeah probably would

00:04:46.480 --> 00:04:51.040
 be ideal if for whatever address that they put in you know and then have it be

00:04:51.040 --> 00:04:57.160
 you know whatever a quarter mile or yeah and then go into a mile or five miles or

00:04:57.160 --> 00:05:01.240
 25 miles or something like that Commissioner Anderson

00:05:01.240 --> 00:05:08.720
 like that but is there a way y'all could have like a little map pop up with their

00:05:08.720 --> 00:05:12.120
 address when they put in their address it pins their address and they could type

00:05:12.120 --> 00:05:16.520
 in like if they selected a quarter mile or show a diameter circle does that

00:05:16.520 --> 00:05:20.880
 make sense because I've seen some applications online before where you can

00:05:20.880 --> 00:05:27.400
 go in and put an address and from your address you can put in a mileage or

00:05:27.400 --> 00:05:30.160
 something like this of distance and it'll show you that parameter around your

00:05:30.160 --> 00:05:33.480
 thing I don't know if that would be so yeah we have that feature on our

00:05:33.480 --> 00:05:37.800
 interactive map but we wouldn't be able to build like a buffer distance feature

00:05:37.800 --> 00:05:43.720
 into a form like this I think we would have the ability availability of somebody

00:05:43.720 --> 00:05:49.040
 to like pin a location within the form but not display a buffer distance from

00:05:49.040 --> 00:05:51.280
 there

00:05:51.280 --> 00:06:03.640
 so I just wanted to recognize a few of the benefits and a couple drawbacks of

00:06:03.640 --> 00:06:08.560
 the system that we're proposing when council discussed it they were looking

00:06:08.560 --> 00:06:14.560
 at more of a fully automated system that somebody would go on but what we feel

00:06:14.560 --> 00:06:18.520
 like a benefit in doing this is we utilize existing software we're not

00:06:18.520 --> 00:06:22.440
 going to have to purchase a separate solution there's no additional cost to

00:06:22.440 --> 00:06:26.840
 the city for doing this one of the benefits of this also is that

00:06:26.840 --> 00:06:32.680
 customizable buffer distance a lot of cities that we've seen that do this and

00:06:32.680 --> 00:06:38.760
 and we didn't find very many but most of them do zones a zone based system where

00:06:38.760 --> 00:06:43.520
 you want just notifications about you know northeast side of town or or

00:06:43.520 --> 00:06:48.240
 southwest side of town then you would pick that zone zone one or zone two this

00:06:48.240 --> 00:06:54.520
 allows us to have a very customizable solution to that person and then also

00:06:54.520 --> 00:06:57.880
 it's immediately deployable which is another benefit we're not gonna have to

00:06:57.880 --> 00:07:03.200
 go through implementation we can we can start this soon like I mentioned it is

00:07:03.200 --> 00:07:08.280
 not fully automated the piece that would not be automated is the email

00:07:08.280 --> 00:07:13.080
 notification system so we would have to pull down a list of the people to

00:07:13.080 --> 00:07:19.000
 notify that week and then send it through an email solution and then we

00:07:19.000 --> 00:07:24.280
 wouldn't send multiple requests or multiple updates about a development as

00:07:24.280 --> 00:07:28.920
 it's ongoing our thought is we would send a notice letting them know that the

00:07:28.920 --> 00:07:33.600
 developments occurring and then provide the solution to where they can go in and

00:07:33.600 --> 00:07:39.040
 keep following up on that as reviews happen and public hearing hearing dates

00:07:39.040 --> 00:07:45.360
 are coming up commissioner Smith so explain that again Charlie just more in

00:07:45.360 --> 00:07:50.500
 depth so I take for an example there's a zoning request it's on tonight that gets

00:07:50.500 --> 00:07:55.440
 publicly notified it's on the agenda for some reason or another that we table

00:07:55.440 --> 00:07:58.960
 that item for discussion for next time they would just get the notice for the

00:07:58.960 --> 00:08:02.200
 first time it's noticed or would how would that work in that system if you

00:08:02.200 --> 00:08:07.720
 can walk me through that yeah so the way we're imagining it is there would be a

00:08:07.720 --> 00:08:12.920
 trigger at a certain point and we say hey just to let you know that there's a

00:08:12.920 --> 00:08:19.640
 project project name project number at this location that has submitted an

00:08:19.640 --> 00:08:25.800
 application and then through our new land management software system they can go

00:08:25.800 --> 00:08:30.120
 online and see the information about that project or they can follow along

00:08:30.120 --> 00:08:35.080
 on the active projects map and get get details on that so it wouldn't be a

00:08:35.080 --> 00:08:40.280
 notice with every every change within that project it would just be a notice

00:08:40.280 --> 00:08:44.280
 one time hey it's out here just so you're aware of it and is it gonna be

00:08:44.280 --> 00:08:48.560
 just zoning changes or is it gonna be every type of notification that comes

00:08:48.560 --> 00:08:52.880
 along is it we do the zoning change and then they submit a preliminary plat and

00:08:52.880 --> 00:08:56.480
 then when it gets the final plan that's on a consent agenda item as it changes

00:08:56.480 --> 00:08:59.560
 agenda as it changes agenda item names is that gonna change through every

00:08:59.560 --> 00:09:04.000
 single time too or how's that gonna work so that actually it's coming up on the

00:09:04.000 --> 00:09:12.400
 next slide unless anybody else has any questions oh so types of projects thank

00:09:12.400 --> 00:09:17.520
 you for leading me into that what our staff recommendation would be is that we

00:09:17.520 --> 00:09:22.440
 notify for things that are coming before P and Z and City Council and not those

00:09:22.440 --> 00:09:26.200
 more administrative type projects a simple engineering plan because at that

00:09:26.200 --> 00:09:30.760
 point we feel like that somebody might be frustrated in the fact that they

00:09:30.760 --> 00:09:35.680
 don't have you know a way to voice their concerns to you all or to City Council

00:09:35.680 --> 00:09:39.440
 because that's already gone through that phase of the project and now it's more

00:09:39.440 --> 00:09:43.780
 administrative civil engineering and we're just reviewing to criteria and if

00:09:43.780 --> 00:09:49.520
 it meets the criteria then it would be approved so happy to take feedback on

00:09:49.520 --> 00:09:55.120
 that item Commissioner Smith thank you chair yes on that piece I think there's

00:09:55.120 --> 00:09:58.800
 items I would I wouldn't say all projects in middles I would definitely

00:09:58.800 --> 00:10:04.480
 say the items that we have not necessarily control but we have review

00:10:04.480 --> 00:10:09.560
 and the right to approve or disapprove which is a lot of items but take for

00:10:09.560 --> 00:10:15.720
 example items like final plats that are on a consent agenda item that we are

00:10:15.720 --> 00:10:19.280
 you know if we disagree with the project as long as it meets the development code

00:10:19.280 --> 00:10:24.440
 we have no we have no jurisdiction as a commission to deny it unless we can cite

00:10:24.440 --> 00:10:28.120
 where in the development code that it's fault and so I think those types of

00:10:28.120 --> 00:10:32.800
 items not being put out there not from a sense of we don't want to keep the

00:10:32.800 --> 00:10:36.840
 public informed but I've seen in the last five years in the commission that

00:10:36.840 --> 00:10:41.960
 sometimes we get some some citizen input and some items that get brought up on

00:10:41.960 --> 00:10:47.960
 concerns that they have that really can't be changed at the standpoint that

00:10:47.960 --> 00:10:53.240
 we're at at that point I think the items like SUPs and any type of zoning changes

00:10:53.240 --> 00:10:56.720
 should definitely be included within there and then any items that are on

00:10:56.720 --> 00:10:59.680
 there for an item for individual consideration but I think the problem

00:10:59.680 --> 00:11:03.960
 with that is that you can have items that end up on items for individual

00:11:03.960 --> 00:11:07.120
 consideration that are in a consent agenda item or in the items for an

00:11:07.120 --> 00:11:11.240
 individual consideration that same type of you know a preliminary plot for

00:11:11.240 --> 00:11:15.780
 example like we pull off consent agenda and put that that discussion and true

00:11:15.780 --> 00:11:19.960
 vote instead of being taken in one whole chunk so I don't know how you guys would

00:11:19.960 --> 00:11:23.720
 see it Charlie from that standpoint of how you delineate between those things

00:11:23.720 --> 00:11:29.000
 but it might create undo angst from community members who maybe don't

00:11:29.000 --> 00:11:32.000
 understand what's happening there they don't realize that they're developing by

00:11:32.000 --> 00:11:34.640
 right and they're submitting something that meets the development code and

00:11:34.640 --> 00:11:38.160
 therefore you get citizen outreach and we have folks coming up here and just to

00:11:38.160 --> 00:11:41.440
 find out that sadly there's nothing they can do even if they don't like the

00:11:41.440 --> 00:11:46.040
 project I think that might cause more issues than then it's probably being

00:11:46.040 --> 00:11:48.960
 asked for than this so

00:11:48.960 --> 00:11:57.560
 yes go ahead and talk to me great Tina sorry no I just wanted to clarify so

00:11:57.560 --> 00:12:02.960
 you were saying that you would like for residents to be notified for all items

00:12:02.960 --> 00:12:05.960
 that have the potential to be considered by the planning and zoning Commission

00:12:05.960 --> 00:12:11.480
 that catch that correctly all items that we actually have basically a decision to

00:12:11.480 --> 00:12:15.560
 say yes or no like a neighborhood input can make a decision of whether or not we

00:12:15.560 --> 00:12:19.040
 approve or not it's like a zoning change right that we can go through as a

00:12:19.040 --> 00:12:22.840
 commission and vote no on it whereas there's those items like final plots

00:12:22.840 --> 00:12:27.880
 that are really more of an administrative process that yes city city

00:12:27.880 --> 00:12:31.040
 staff has come and said it's a recommendation for approval because it

00:12:31.040 --> 00:12:36.400
 meets the DDC unless we say it doesn't okay we can't we can't we can't vote

00:12:36.400 --> 00:12:41.400
 no on it by by Texas Legislature tax law government code so I think it's more of

00:12:41.400 --> 00:12:45.540
 the zoning pieces there okay so notification on the zoning and the

00:12:45.540 --> 00:12:50.680
 specific use permits but not the plats that's what I'm sure that that's yeah

00:12:50.680 --> 00:12:53.160
 and that's what I was trying to say to Charlie's that there's times when it's

00:12:53.160 --> 00:12:56.680
 on a consent agenda item that we can pull its items to an individual

00:12:56.680 --> 00:12:59.920
 consideration where we actually have discussion on it rather than taking in

00:12:59.920 --> 00:13:05.400
 one large group but saying all items for individual consideration should be pulled

00:13:05.400 --> 00:13:09.640
 aside and they should be notified on is difficult to do because there are items

00:13:09.640 --> 00:13:14.320
 that upon individual consideration that are administrative in vote right so I'm

00:13:14.320 --> 00:13:17.100
 not sure how to make that clarification different it might be a baby with the

00:13:17.100 --> 00:13:21.040
 bathwater issue so in my recommendation if there's no way to delineate between

00:13:21.040 --> 00:13:25.240
 those then it would be it would be zoning and the SUPs okay thank you let's

00:13:25.240 --> 00:13:29.440
 let's try to clarify this where you have that recommendation Charlie where it

00:13:29.440 --> 00:13:33.760
 says notify for only projects coming before PNC and council what is your

00:13:33.760 --> 00:13:42.160
 definition of project so so for us a project would be those different ones so

00:13:42.160 --> 00:13:48.460
 if you have a SUP then it's separate from a zoning case so not not as a

00:13:48.460 --> 00:13:52.480
 project as maybe the general public would think about a project right they

00:13:52.480 --> 00:13:56.480
 just see the site and it's being developed all as one item when we talk

00:13:56.480 --> 00:13:59.600
 about projects here I'm talking about those individual ones that may come in

00:13:59.600 --> 00:14:03.500
 a line to you all right I'm assuming when you're saying project you're

00:14:03.500 --> 00:14:13.720
 probably not discussing plats correct thank you what we have noted here is

00:14:13.720 --> 00:14:18.120
 that those items that require a public hearing would be the items that we would

00:14:18.120 --> 00:14:23.160
 have the notification on so that's typically zoning requests the specific

00:14:23.160 --> 00:14:28.320
 use permits there are some one-offs like projects in the razor ranch overlay

00:14:28.320 --> 00:14:31.880
 district that I think technically require a public hearing we had one on

00:14:31.880 --> 00:14:36.320
 your agenda here not too long ago but our primary focus on this and Charlie

00:14:36.320 --> 00:14:39.520
 correct me if I'm wrong was on the public hearing items because those are

00:14:39.520 --> 00:14:44.160
 the ones that were sending out public notification to the the residents or

00:14:44.160 --> 00:14:48.000
 individuals where they would get some sort of notification and usually those

00:14:48.000 --> 00:14:51.960
 are the projects I think folks are most interested in and that's the area where

00:14:51.960 --> 00:14:55.400
 they have the opportunity to influence the decision of the planning and zoning

00:14:55.400 --> 00:14:59.160
 Commission and Council it's much more difficult as Commissioner Smith pointed

00:14:59.160 --> 00:15:04.320
 out when we have plats that are on the agenda or a site plan that's on the

00:15:04.320 --> 00:15:08.280
 agenda for whatever reason that our ministerial approval if it meets all the

00:15:08.280 --> 00:15:12.080
 technical requirements then you're obligated to approve it so that's where

00:15:12.080 --> 00:15:16.040
 we feel like homeowners or residents would have the would probably get more

00:15:16.040 --> 00:15:19.320
 frustrated and Commissioner Smith you picked up on that as well is that they'd

00:15:19.320 --> 00:15:22.880
 get more frustrated because why I spent all this time came down to City Hall

00:15:22.880 --> 00:15:26.440
 and you're telling me though that even though I don't like this project and you

00:15:26.440 --> 00:15:29.760
 all should vote no you're telling me you have to vote yes then why'd I come down

00:15:29.760 --> 00:15:34.560
 here right so so that's why we initially focused on just those items that are

00:15:34.560 --> 00:15:37.680
 triggering the public hearing so that have the public notification requirement

00:15:37.680 --> 00:15:41.880
 if anything they're getting a more advanced notice than the typical mailed

00:15:41.880 --> 00:15:45.200
 notice that we receive and I think that's one of the questions also that

00:15:45.200 --> 00:15:49.960
 Charlie's gonna be seeking feedback on is at what point in time do we notify

00:15:49.960 --> 00:15:55.880
 folks on this because the fact of applications changes they're working

00:15:55.880 --> 00:16:01.200
 their way through our review and in discussions with the applicant a great

00:16:01.200 --> 00:16:04.120
 example is that you know there's only case that's on your agenda this evening

00:16:04.120 --> 00:16:08.680
 Lisa and the applicant have been working on that for several months now and so

00:16:08.680 --> 00:16:11.640
 you know do we notify the applicant right when that application walks in our

00:16:11.640 --> 00:16:16.800
 door or do we wait till they get further in the process when we do the public

00:16:16.800 --> 00:16:20.000
 notification and mail notes so looking for I think some feedback and direction

00:16:20.000 --> 00:16:22.680
 from you on that as well and I think you're about to get that that part of

00:16:22.680 --> 00:16:26.400
 your presentation right yeah yeah Commissioner Smith did that help with

00:16:26.400 --> 00:16:30.480
 it did public being that it's public hearing only I think the only piece the

00:16:30.480 --> 00:16:32.800
 reason why I brought the items for individual consideration is that we've

00:16:32.800 --> 00:16:36.240
 had a precedent in the past on the Commission that even though items for

00:16:36.240 --> 00:16:39.760
 individual consideration don't warn a public hearing we've had chairs in the

00:16:39.760 --> 00:16:44.320
 past who've allowed for public comment on those projects and so it it would be

00:16:44.320 --> 00:16:48.200
 messy to say they were only gonna notify for public hearings then there's comes

00:16:48.200 --> 00:16:52.000
 up an item for individual consideration and you let this citizen talk about it at

00:16:52.000 --> 00:16:55.440
 that time I should have been notified so I'd rather keep it as public hearing

00:16:55.440 --> 00:16:59.600
 items and then possibly tighten down the individual for items for individual

00:16:59.600 --> 00:17:03.440
 consideration public discussion part but yeah so that works

00:17:03.440 --> 00:17:09.480
 Commissioner Perot thank you chair just a couple of process questions because I'm

00:17:09.480 --> 00:17:15.280
 not sure how the the projects go through especially the the ministerial ones that

00:17:15.280 --> 00:17:22.160
 you described are there ever applications where a developer will

00:17:22.160 --> 00:17:27.400
 hold a community input meeting even if their plan is to do a by right

00:17:27.400 --> 00:17:32.560
 development just to to see you know and be open with the community or is that

00:17:32.560 --> 00:17:39.680
 really out of the blue that never happens I know it's saying never is

00:17:39.680 --> 00:17:44.040
 dangerous but just in general have you seen that in the last two or three years

00:17:44.040 --> 00:17:48.840
 I was to say I'm gonna defer to the peanut gallery over there because some

00:17:48.840 --> 00:17:52.320
 have been here longer than I've been on whether or not we've had applicants do

00:17:52.320 --> 00:18:08.080
 those meetings on by right projects good afternoon Haley Sikorsky we in the

00:18:08.080 --> 00:18:11.320
 peanut gallery cannot think of any instance where someone has willingly done

00:18:11.320 --> 00:18:14.280
 a neighborhood meeting for a by right development but that's not say it

00:18:14.280 --> 00:18:18.040
 couldn't occur I don't know if that helps address the question yeah it does

00:18:18.040 --> 00:18:25.240
 thank you and then I guess on the other side of things once once we have the

00:18:25.240 --> 00:18:29.840
 pre-application conferences and all of the terms that I'm gonna forget the

00:18:29.840 --> 00:18:40.160
 specific terms of the meetings if it's by right does staff ever inform the

00:18:40.160 --> 00:18:44.900
 developers for a particular project about things that we know about the

00:18:44.900 --> 00:18:52.240
 neighborhood that would be appreciated even if we have no authority to to force

00:18:52.240 --> 00:18:55.520
 them since it's a by right development or is it purely just here's what the

00:18:55.520 --> 00:19:04.640
 code says here's the guidelines good luck if there are areas that we feel

00:19:04.640 --> 00:19:09.640
 might be able to offer suggestions or positive influence of development in

00:19:09.640 --> 00:19:13.800
 other way especially if it's improving the development layout you know we try

00:19:13.800 --> 00:19:18.840
 to offer those suggestions as part of our review if the plan meets the

00:19:18.840 --> 00:19:22.920
 technical requirements you know then the applicant can always tell us no right

00:19:22.920 --> 00:19:26.200
 but you know we can always make those suggestions you know if we happen to

00:19:26.200 --> 00:19:30.280
 know that this neighborhood over here is going to be concerned regarding what

00:19:30.280 --> 00:19:34.000
 type of screening that you install you know it might be in your best interest to

00:19:34.000 --> 00:19:38.360
 choose from these items on the list even though you have the the full gamut

00:19:38.360 --> 00:19:41.760
 available and ultimately is up to their decision as to as what they choose

00:19:41.760 --> 00:19:45.480
 because if it meets our code requirement we're obligated to approve it so okay so

00:19:45.480 --> 00:19:50.640
 and I don't want to say it depends but but you know I think there's when we

00:19:50.640 --> 00:19:54.320
 have the opportunity to potentially influence I mean we try to do so but

00:19:54.320 --> 00:19:58.580
 also in a reasonable manner yeah thank you that helps and I mean I'm just

00:19:58.580 --> 00:20:02.140
 trying to think through all the different types of projects I think it

00:20:02.140 --> 00:20:06.560
 makes sense to to focus on the items that still come before Council and P&Z I

00:20:06.560 --> 00:20:12.720
 would just put forth the idea that if if you see an increasing number of projects

00:20:12.720 --> 00:20:18.200
 that you wish you had more citizen input in even if they are by right maybe it

00:20:18.200 --> 00:20:22.800
 makes sense to revisit this you know a year or two down the line and then I

00:20:22.800 --> 00:20:31.560
 guess one other thing the the the broad city website right now I believe has a

00:20:31.560 --> 00:20:38.880
 subscription functionality to the public hearing news section yeah is that right

00:20:38.880 --> 00:20:43.800
 that's fair so I guess I would just wonder whether we could minimize staff

00:20:43.800 --> 00:20:49.160
 time by putting a big bold notice on this form and say hey if you want to get

00:20:49.160 --> 00:20:54.960
 all the public hearings please go sign up here right so that you don't have a

00:20:54.960 --> 00:21:00.040
 number of people who fill out their address and say you know 15,000 feet and

00:21:00.040 --> 00:21:05.080
 and it's more manual steps does that make sense yeah I see what you're saying

00:21:05.080 --> 00:21:10.240
 yeah we can definitely point people to that option I think it goes back to the

00:21:10.240 --> 00:21:16.960
 timing aspect of it because the public hearing notices go on the website at the

00:21:16.960 --> 00:21:19.880
 same time that we're sending the letters out and posting it in the newspaper

00:21:19.880 --> 00:21:24.760
 right which is kind of after the input community input meetings and that sort

00:21:24.760 --> 00:21:28.600
 of thing have typically taken place right yeah if they're gonna hold a

00:21:28.600 --> 00:21:33.600
 neighborhood meeting then that would have occurred before any type of public

00:21:33.600 --> 00:21:40.780
 hearing okay would have and then sorry last thing I promise I wonder if and I'm

00:21:40.780 --> 00:21:46.800
 not sure about privacy laws and that sort of thing would it be possible for

00:21:46.800 --> 00:21:55.240
 projects again that are a public hearing type of item to provide the development

00:21:55.240 --> 00:21:59.840
 community for that project a list of residents that had signed up to be

00:21:59.840 --> 00:22:02.920
 interested within a certain distance so that they could be added to the

00:22:02.920 --> 00:22:07.840
 developers list for a community input meeting yeah we could probably add that

00:22:07.840 --> 00:22:12.280
 step in there right now we're providing that 500 foot the same ones that we're

00:22:12.280 --> 00:22:15.880
 sending the postcard and letters out to you those get provided for neighborhood

00:22:15.880 --> 00:22:20.480
 meetings so that the developers can send out the notices to those

00:22:20.480 --> 00:22:24.800
 neighborhoods we could we could add in our process though the list of people

00:22:24.800 --> 00:22:31.320
 within that buffer zone okay that's all Commissioner Smith to answer your

00:22:31.320 --> 00:22:36.800
 question on timing I think the timing should be with Commissioner Smith yeah I

00:22:36.800 --> 00:22:41.960
 really want Charlie to get through his presentation I don't think he did right

00:22:41.960 --> 00:22:47.000
 did you get oh yeah I can walk over and then we'll get back to that I just feel

00:22:47.000 --> 00:23:04.000
 like we did quite tidy and so the second bullet is talking about the

00:23:04.000 --> 00:23:09.400
 project changes which Tina alluded to one of the the considerations that we

00:23:09.400 --> 00:23:14.720
 have is if we're noticing as soon as we receive a project application there could

00:23:14.720 --> 00:23:19.880
 be that month or a couple months timeframe before you all see it here

00:23:19.880 --> 00:23:25.920
 whereas a project may change significantly and then the other the

00:23:25.920 --> 00:23:32.240
 other item is that if we're noticing at the beginning of a project then someone

00:23:32.240 --> 00:23:37.360
 may have a bunch of questions that we may not have answers to just quite yet

00:23:37.360 --> 00:23:42.840
 we may have not dug into the project or completed our reviews so if we're

00:23:42.840 --> 00:23:48.960
 noticing you know day one hour one and then somebody gets that notice and then

00:23:48.960 --> 00:23:55.440
 they have instant questions that could be a lot on on city staff to need to

00:23:55.440 --> 00:24:00.040
 answer those questions so our our recommendation would be to notice before

00:24:00.040 --> 00:24:07.280
 any type of community meeting or public hearing so if if they do hold a

00:24:07.280 --> 00:24:16.440
 neighborhood meeting in advance then we can notify prior to that and that's it

00:24:16.440 --> 00:24:20.840
 all right and then this item I'm seeking feedback on these items we're going to

00:24:20.840 --> 00:24:30.560
 City Council on May 3rd Commissioner Smith thank you on timing that would I

00:24:30.560 --> 00:24:35.000
 know doing it before basically what you're saying is the staff recommendation

00:24:35.000 --> 00:24:39.840
 is doing doing the notifications but while community meetings are occurring

00:24:39.840 --> 00:24:44.680
 rather than doing it at public hearing notices is that correct right

00:24:44.680 --> 00:24:48.480
 traditionally how far those apart usually about two weeks is what I've

00:24:48.480 --> 00:24:51.680
 seen in the past when we've seen projects two three weeks and is that I

00:24:51.680 --> 00:24:54.760
 want to make sure what kind of like what Commissioner Prue was saying does that

00:24:54.760 --> 00:24:59.240
 create undue stress on staff by having to figure out for every single project

00:24:59.240 --> 00:25:01.600
 when are these neighborhood meetings occurring and then therefore how do we

00:25:01.600 --> 00:25:04.680
 need to push those out and when do we need to push those out because seems to

00:25:04.680 --> 00:25:09.720
 me that the less stress on staff but still giving notification still giving

00:25:09.720 --> 00:25:13.720
 public citizens the opportunity because a public agenda item to come and voice

00:25:13.720 --> 00:25:18.040
 their concerns and give their input doing it at the time of public notice

00:25:18.040 --> 00:25:21.480
 when stakes are in the ground and sign is up and that's and on the agenda and

00:25:21.480 --> 00:25:26.520
 it's posted seems like the more efficient for both staff city as well

00:25:26.520 --> 00:25:30.280
 citizens will give him that opportunity I get the neighborhood meeting piece but

00:25:30.280 --> 00:25:33.880
 it seems to be a more efficient method I don't know if that if there's an issue

00:25:33.880 --> 00:25:39.360
 with that in your opinion it would add a bit of complexity if we were going to do

00:25:39.360 --> 00:25:42.760
 it before any neighborhood meeting obviously if we're doing it at the time

00:25:42.760 --> 00:25:47.680
 of all the other notices there wouldn't be quite the complexity but you might

00:25:47.680 --> 00:25:51.040
 miss out also on the opportunity for somebody who wants to provide feedback

00:25:51.040 --> 00:25:55.040
 in a neighborhood meeting setting we are getting those neighborhood meetings

00:25:55.040 --> 00:26:01.480
 sometimes not as far in advance as we would like but we do send those out to

00:26:01.480 --> 00:26:05.200
 you all I think perceive the emails about neighborhood meetings that are

00:26:05.200 --> 00:26:13.360
 occurring and we could do something at the same time okay I think I made my

00:26:13.360 --> 00:26:17.600
 point now on timing but I think I think I think that it'll end up being sloppy

00:26:17.600 --> 00:26:25.120
 personally that if a developer gets it to you 48 hours in advance the developer

00:26:25.120 --> 00:26:29.000
 is not going to get the heat for not having notified everybody in time for

00:26:29.000 --> 00:26:31.760
 not knowing about the neighborhood meeting the city is going to catch it

00:26:31.760 --> 00:26:38.000
 and so it seems to be more efficient easier on you guys safer and still

00:26:38.000 --> 00:26:41.200
 provides the opportunity by saying at public notice but I'm open to hear

00:26:41.200 --> 00:26:45.960
 differences between there one item other question before I give it up the

00:26:45.960 --> 00:26:51.200
 integration of this process or those notifications with submission a public

00:26:51.200 --> 00:26:55.220
 comment is there going to be that type of integration where here's the

00:26:55.220 --> 00:27:01.100
 notification any type of response can be driven through here or do you want to

00:27:01.100 --> 00:27:03.560
 limit that just to those who are two hundred and five hundred even though

00:27:03.560 --> 00:27:09.160
 technically anybody who lives anywhere can make those those opinions known they

00:27:09.160 --> 00:27:13.040
 just don't necessarily get counted into the buffer rules yeah we would still

00:27:13.040 --> 00:27:18.320
 follow our same response process that we do now but I think you guys are

00:27:18.320 --> 00:27:23.400
 getting in your backups responses that we receive about any project so it would

00:27:23.400 --> 00:27:26.560
 be similar to that if we received a response from somebody who had been in

00:27:26.560 --> 00:27:31.560
 the opt-in we would provide that in your backup I'm just wondering about how you

00:27:31.560 --> 00:27:36.400
 integrate can you integrate that basically this is the simplistic stupid

00:27:36.400 --> 00:27:40.800
 way of my mind working in a link in there they said you want to provide

00:27:40.800 --> 00:27:43.800
 response click here and it pulls it up does the does the response and send

00:27:43.800 --> 00:27:46.640
 Smith's that in through the electronic submission system I don't know if you

00:27:46.640 --> 00:27:50.480
 guys have that integrated in there if there's a concern on that we hadn't

00:27:50.480 --> 00:27:55.280
 contemplated it it's something we can look into you okay that's all I got you

00:27:55.280 --> 00:28:03.160
 thank you Commissioner Smith other comments thoughts Commissioner Prout

00:28:03.160 --> 00:28:10.200
 thank you chair and I guess I understand that the goal is to keep effort light

00:28:10.200 --> 00:28:15.680
 but I do think that giving people that early opportunity at a neighborhood

00:28:15.680 --> 00:28:21.800
 meeting type setting is is crucial to get the input before the blood starts to

00:28:21.800 --> 00:28:28.120
 boil if you will I guess my question would be you know the signs that we put

00:28:28.120 --> 00:28:33.400
 up to physical signs at the site is the timing of the postings of that sign

00:28:33.400 --> 00:28:39.920
 something that we determine or is that something that's state law driven you

00:28:39.920 --> 00:28:44.040
 may take that state law does not require the posting of a sign on the property

00:28:44.040 --> 00:28:48.120
 okay all the state law requires is that we notify property owners within 200

00:28:48.120 --> 00:28:52.680
 feet the day before that I think it's the day before the 10th day preceding

00:28:52.680 --> 00:28:55.800
 the meeting is is think how that wording is but basically it's a 10-day mailed

00:28:55.800 --> 00:29:00.800
 notice and but signs are not required so and and then we require the stuff we

00:29:00.800 --> 00:29:08.800
 require so just just an idea to try to streamline it what if we were to amend

00:29:08.800 --> 00:29:14.000
 our sign posting requirements to say you must post the sign X number of days

00:29:14.000 --> 00:29:17.960
 before you have a neighborhood meeting and then you just use the the

00:29:17.960 --> 00:29:21.740
 notification from the developer that I've posted the sign now as the trigger

00:29:21.740 --> 00:29:26.600
 to send out the notices I think possibly the issue with that is a neighborhood

00:29:26.600 --> 00:29:32.280
 meeting is not required it's suggested so it's not a requirement that sure and

00:29:32.280 --> 00:29:35.800
 then it would fall back to our existing requirements of the timing of the sign

00:29:35.800 --> 00:29:45.720
 being posted for 30 days or whatever right being that we Charlie Haley do we

00:29:45.720 --> 00:29:48.880
 have specified in the ordinance the minimum number of days that the sign

00:29:48.880 --> 00:30:00.000
 has to be posted in the DDC it's not specified in the DDC it's a policy

00:30:00.000 --> 00:30:02.720
 document that we pass out to applicants that show them what the sign needs to

00:30:02.720 --> 00:30:06.160
 look like when it's going when it needs to be posted which I believe is 10 days

00:30:06.160 --> 00:30:10.680
 prior to the P&Z public hearing and then we have of course the affidavit that

00:30:10.680 --> 00:30:13.680
 they returned to us that we include in your backup that that verifies that they

00:30:13.680 --> 00:30:18.000
 have posted that in time okay so our policy is 10 the sign needs to be up 10

00:30:18.000 --> 00:30:21.760
 days prior correct so it's basically it syncs up with our mail notice

00:30:21.760 --> 00:30:24.840
 requirement yeah so if that timing doesn't work that's fine I was just

00:30:24.840 --> 00:30:28.800
 trying to think of some way to streamline it while still giving the

00:30:28.800 --> 00:30:34.200
 public the opportunity at those neighborhood meetings okay thanks

00:30:34.200 --> 00:30:44.280
 Commissioner Cole thank you chair all I really want to know is I'm worried about

00:30:44.280 --> 00:30:48.320
 you guys being overburdened because y'all your plate is full staff's plates

00:30:48.320 --> 00:30:55.800
 full so the only concern I have in your opinion would this be a burden is this

00:30:55.800 --> 00:31:01.800
 too much for you guys that's what I care about I mean you know y'all are under

00:31:01.800 --> 00:31:10.560
 enough is this add to that plate from from the noted notification process I

00:31:10.560 --> 00:31:15.720
 don't think it's gonna add that much to staffs plate but from the collection of

00:31:15.720 --> 00:31:20.840
 the need to respond to to people that have questions ever it's a result of the

00:31:20.840 --> 00:31:25.760
 opt-in it could be a lot on the planning staff you know it depending on how

00:31:25.760 --> 00:31:30.120
 many people opt-in for something like this if you're sending out hundreds of

00:31:30.120 --> 00:31:36.520
 notices a week in advance of a meeting then if we're having to collect those

00:31:36.520 --> 00:31:42.480
 responses and then analyze them respond and return it in your backup that's a

00:31:42.480 --> 00:31:47.960
 lot on the planning stuff I would concur and that's been one of our concerns as

00:31:47.960 --> 00:31:52.520
 we've developed this system and Charlie correct me if I'm wrong but because I

00:31:52.520 --> 00:31:55.600
 remember we've had we've had several discussions on this but I think we were

00:31:55.600 --> 00:32:01.560
 even discussing like limiting the number of times someone might be able to opt in

00:32:01.560 --> 00:32:08.000
 or a distance from a property because of for example if there's a project

00:32:08.000 --> 00:32:12.760
 happening in the southwest part of town but someone resides in the northeast

00:32:12.760 --> 00:32:16.960
 part of town you know would they the person in northeast part of town be able

00:32:16.960 --> 00:32:20.760
 to sign up for that project that's many miles away from where they live right

00:32:20.760 --> 00:32:25.160
 and so to try and help manage that because of being concerned of just us

00:32:25.160 --> 00:32:30.160
 getting inundated with with public comment but I can't recall where we

00:32:30.160 --> 00:32:35.440
 landed on that yeah I think that the buffer distance would be open the way

00:32:35.440 --> 00:32:40.080
 that we're looking at trying to decrease the possible in you know decrease the

00:32:40.080 --> 00:32:44.720
 possible increase but to do that would be to provide as much information as as

00:32:44.720 --> 00:32:50.720
 we can upfront to individuals so like I had mentioned before and I can pull this

00:32:50.720 --> 00:32:55.880
 up after the presentation to how somebody might go online search a project

00:32:55.880 --> 00:33:01.240
 and get information on where it's at and what kind of documents are attached to

00:33:01.240 --> 00:33:06.680
 it so that they have a little more information upfront and it's you know at

00:33:06.680 --> 00:33:10.640
 least then we don't have staff sending like here's here's the plans for this

00:33:10.640 --> 00:33:15.280
 one or it'll reduce some of those items

00:33:15.680 --> 00:33:22.000
 mr. Anderson thank you I wouldn't not like the idea of if somebody has a

00:33:22.000 --> 00:33:24.680
 property in the north side of town and not letting somebody on the south side

00:33:24.680 --> 00:33:30.880
 of town do that because you might have people who own rental properties that you

00:33:30.880 --> 00:33:33.520
 know want to know what's going on on their you know the rental properties they

00:33:33.520 --> 00:33:36.880
 have on the north side of town or the south or vice versa or you know on the

00:33:36.880 --> 00:33:45.040
 south side of town so I would advise against not allowing somebody to opt in

00:33:45.040 --> 00:33:50.080
 on just one section of area and because what if you know like I said property

00:33:50.080 --> 00:33:53.560
 owner a developer wants to know what's going on over there too because they

00:33:53.560 --> 00:33:56.720
 might have some property over there they want to develop and they don't want you

00:33:56.720 --> 00:34:00.720
 know you won't let them in because they don't live in that area you know what if

00:34:00.720 --> 00:34:05.440
 somebody out of town you know like a developer lives in Dallas that has some

00:34:05.440 --> 00:34:08.960
 property on that side of town that's that's near some property that's being

00:34:08.960 --> 00:34:12.520
 developed they want to know what's going on as well so I kind of I don't really

00:34:12.520 --> 00:34:18.600
 kind of like that idea to be honest so yeah and I guess I'll just add to this I

00:34:18.600 --> 00:34:22.600
 mean this what we're really talking about here is a notification right we're

00:34:22.600 --> 00:34:28.480
 not saying we've got to provide all of this information to these people all at

00:34:28.480 --> 00:34:33.720
 this time if they opt in for a project I would hope that they get a notification

00:34:33.720 --> 00:34:38.680
 of the project and then they get an idea of where they can go seek information on

00:34:38.680 --> 00:34:44.600
 it and put the onus on them to if they're interested this is the this is

00:34:44.600 --> 00:34:48.280
 the place you go here's the notification that it's happening here's the place

00:34:48.280 --> 00:34:55.120
 that you go and in that place that they go is the staff contact I assume if they

00:34:55.120 --> 00:35:00.880
 should have questions I mean is that am I following the logic and in how that how

00:35:00.880 --> 00:35:04.800
 this is gonna work yeah exactly that's that's the way we're visualizing it in

00:35:04.800 --> 00:35:10.080
 the email you know you would you would provide a link and then say here you can

00:35:10.080 --> 00:35:15.480
 you can go to view information about the project here you can find P&Z and city

00:35:15.480 --> 00:35:21.520
 council dates on this website too so included in this is redesign of our

00:35:21.520 --> 00:35:26.520
 active projects map and we've got a few items that we're gonna try to to clean

00:35:26.520 --> 00:35:32.880
 up there and make it a little more user friendly for the general public and then

00:35:32.880 --> 00:35:35.240
 that would include all of the information about the project as well

00:35:35.240 --> 00:35:42.520
 and then at what point Charlie are you thinking the notification of a project

00:35:42.520 --> 00:35:51.400
 would go out when it's set for an agenda already or at what point would you send

00:35:51.400 --> 00:35:56.600
 out that notification through this system before any type of community

00:35:56.600 --> 00:36:03.840
 meeting or public hearing is what what we're recommending how at the same time

00:36:03.840 --> 00:36:09.160
 of other notices okay so at the same time that you would be sending out

00:36:09.160 --> 00:36:16.240
 mailers you would be pinging this yep okay all right

00:36:16.240 --> 00:36:25.960
 anybody else with thoughts or comments okay did we help get you what you needed

00:36:25.960 --> 00:36:30.000
 to bring back to council yep I will provide the Commission's feedback to

00:36:30.000 --> 00:36:36.800
 City Council when we present on May 3rd okay and then real quickly I just wanted

00:36:36.800 --> 00:36:46.480
 to highlight the eTrackIt website so if you go on our land development page and

00:36:46.480 --> 00:36:52.960
 you go to eTrackIt you're able here to search for a project and you can search

00:36:52.960 --> 00:36:58.920
 project number here so this is what we would is this what you would point them

00:36:58.920 --> 00:37:04.520
 to yeah we would provide links out to the active projects map and in this page

00:37:04.520 --> 00:37:10.840
 and they would be integrated with the solution of the active projects map so

00:37:10.840 --> 00:37:15.160
 they can find some site info contact information mm-hmm that's great all right

00:37:15.160 --> 00:37:22.080
 thank you all thank you too okay that'll bring us to our next work

00:37:22.080 --> 00:37:35.760
 session report which is 2B PZ 22075 I believe Haley is presenting that good

00:37:35.760 --> 00:37:41.440
 evening again Haley Zagorski so this is just a quick update for you all last

00:37:41.440 --> 00:37:45.160
 year you know we went through a series of of planning boot camps or training

00:37:45.160 --> 00:37:50.120
 sessions we covered a variety of kind of high-level topics last year regarding

00:37:50.120 --> 00:37:55.160
 just planning in general zoning and variances the shot clock we covered a

00:37:55.160 --> 00:37:59.000
 couple of times so we don't want to repeat those topics necessarily unless

00:37:59.000 --> 00:38:02.960
 there's just a particular interest in them but we are looking to continue just

00:38:02.960 --> 00:38:06.560
 some some educational work sessions for you all to to give you a variety of

00:38:06.560 --> 00:38:10.160
 topics and discussions so this is the tentative list that we've pulled

00:38:10.160 --> 00:38:13.520
 together of things that we thought you all might be interested in or things

00:38:13.520 --> 00:38:17.000
 that you've indicated through the matrix that you would like a future discussion

00:38:17.000 --> 00:38:22.100
 on so some of these for example annexation parking drainage and

00:38:22.100 --> 00:38:25.700
 transportation topics we've heard through the matrix portion of the agenda

00:38:25.700 --> 00:38:28.880
 that you all have an interest in so we've slated those in for some tentative

00:38:28.880 --> 00:38:33.320
 dates over the coming months as well as some some additional topics for example

00:38:33.320 --> 00:38:37.720
 the city's municipal utility district policy will be going to City Council so

00:38:37.720 --> 00:38:40.440
 we thought that would be something that you all might also have an interest in

00:38:40.440 --> 00:38:44.720
 so we'd like to bring that forward so this is like I said our tentative work

00:38:44.720 --> 00:38:47.760
 schedule for the year we wanted to get some feedback to make sure that there's

00:38:47.760 --> 00:38:50.640
 not something that we've completely missed that you all are interested in a

00:38:50.640 --> 00:38:54.640
 discussion on or any of these that you might just say you know what we were not

00:38:54.640 --> 00:38:59.360
 interested in a discussion on that topic so simply just looking for feedback to

00:38:59.360 --> 00:39:02.760
 see if if we have a nod of approval to move forward with this or if there's

00:39:02.760 --> 00:39:09.480
 something else that you all would like slated on this agenda thoughts

00:39:09.480 --> 00:39:15.760
 Commissioner Pruitt thank you chair now I think this list looks fantastic I

00:39:15.760 --> 00:39:19.760
 really thank staff for putting thought and effort into this I think it

00:39:19.760 --> 00:39:25.960
 incorporates some of the things that we've heard in a lot of our time over

00:39:25.960 --> 00:39:35.400
 this last year only thing that I would ask is I know we talked a lot about we

00:39:35.400 --> 00:39:43.000
 had that one boot camp item about sustainable environmental impacts to

00:39:43.000 --> 00:39:50.200
 specific pieces of land right like riparian areas etc and and I don't know

00:39:50.200 --> 00:39:52.920
 that this is the direction that's going because I haven't been following the

00:39:52.920 --> 00:39:57.720
 sustainability framework committee all that closely but maybe as we get into

00:39:57.720 --> 00:40:04.000
 next year if there are goals through that sustainable framework that are

00:40:04.000 --> 00:40:10.060
 impacted by land use decisions as opposed to you know how a riparian area

00:40:10.060 --> 00:40:16.480
 changes but things that that may not effects that may not be an effect of the

00:40:16.480 --> 00:40:22.120
 land but an effect of air quality or other goals that that framework has and

00:40:22.120 --> 00:40:27.840
 is looking at I'd be interested to understand what impact the land use

00:40:27.840 --> 00:40:32.880
 decisions have on those things so that we can make sure we're aligned okay yeah

00:40:32.880 --> 00:40:41.040
 we can certainly look into that anybody else everybody like the upcoming topics

00:40:41.040 --> 00:40:49.000
 I'm sorry I'm gonna miss some of them be here for part of that anyway I'm

00:40:49.000 --> 00:40:51.440
 thinking about it I just say yeah there's some that you would like to see

00:40:51.440 --> 00:40:56.000
 before before August you can let us know okay that sounds good well and I think

00:40:56.000 --> 00:41:01.320
 we also tried to be strategic in what we calendared and when because of a couple

00:41:01.320 --> 00:41:06.480
 projects that we have going on but yeah we're open I mean if there's something

00:41:06.480 --> 00:41:10.440
 that you feel like you would like to have sooner than later I mean let us

00:41:10.440 --> 00:41:15.720
 know we were also trying to take into consideration if we have any new

00:41:15.720 --> 00:41:23.400
 appointees to the Planning Commission in the timing of that would occur so so

00:41:23.400 --> 00:41:27.160
 that kind of influenced our decision on some of those items but again we're here

00:41:27.160 --> 00:41:34.240
 to respond to requests that you all have made Commissioner Smith I know there's

00:41:34.240 --> 00:41:38.560
 gonna be a hot button discussion item on an affordable housing project that's

00:41:38.560 --> 00:41:44.760
 coming off of Sanders and Country Club I believe so I don't know I know housing

00:41:44.760 --> 00:41:48.640
 affordability is a 2023 item but I don't know if that's possibly discussion for

00:41:48.640 --> 00:41:51.280
 earlier if it gets that point or if there's been developments in that

00:41:51.280 --> 00:41:56.040
 project since the neighborhood was originally notified so I'm not sure

00:41:56.040 --> 00:41:58.920
 what's going on with that specific project other than it's still in

00:41:58.920 --> 00:42:02.560
 discussion and will likely come forward at some point in the future as a zoning

00:42:02.560 --> 00:42:06.000
 request but we can certainly look into moving that up we were thinking just

00:42:06.000 --> 00:42:10.440
 general topics that affect affordability like our development regulations parking

00:42:10.440 --> 00:42:13.880
 standards things of that nature and how they relate to affordable housing so if

00:42:13.880 --> 00:42:17.680
 that's of interest we can we can look at moving that up to get to it this year

00:42:17.680 --> 00:42:22.280
 that and then including in that project once again it's possible topic and maybe

00:42:22.280 --> 00:42:27.800
 that doesn't even come up maybe it's not even needed till 2023 but I think including the

00:42:27.800 --> 00:42:32.720
 the the process of going through City Council for the inspection of being able

00:42:32.720 --> 00:42:35.760
 to do that and how the housing credit or that the tax abatements work within that

00:42:35.760 --> 00:42:45.040
 would be helpful as well certainly great anything else looks great Haley thank

00:42:45.040 --> 00:42:50.920
 you all right thank you all appreciate it okay that is the end of our work

00:42:50.920 --> 00:42:55.480
 session report so we will get on to clarification of our agenda items for

00:42:55.480 --> 00:43:00.960
 this evening first one is our minutes for April 13th are there any

00:43:00.960 --> 00:43:10.680
 clarifications needed on the minutes okay we'll go into items for individual

00:43:10.680 --> 00:43:18.640
 consideration there's an election of chair and vice chair I'm gonna let maybe

00:43:18.640 --> 00:43:24.720
 Tina reference why we're doing that sure thing thank you you're welcome so it was

00:43:24.720 --> 00:43:27.400
 brought to our attention by the city secretary's office that apparently we

00:43:27.400 --> 00:43:31.360
 need to be doing this in January so we're playing catch-up with some of our

00:43:31.360 --> 00:43:36.200
 boards and commissions so this evening we will need to have nominations for

00:43:36.200 --> 00:43:39.640
 election of a chair and then following that we would do the vice chair but it's

00:43:39.640 --> 00:43:45.280
 just to get us in in compliance with the the city secretary's office if you don't

00:43:45.280 --> 00:43:55.120
 mind questions comments so your mission or call it just seems like we did this

00:43:55.120 --> 00:44:03.560
 just a couple months ago and and and understand your concern and and also we

00:44:03.560 --> 00:44:08.560
 actually staff the planning team tried to advocate for potentially doing this

00:44:08.560 --> 00:44:12.960
 later in the year because we know technically Commissioner Ellis is is

00:44:12.960 --> 00:44:18.360
 termed out come this August so so we'll yeah potentially be doing this again

00:44:18.360 --> 00:44:23.640
 depending upon what the results of tonight are but is but so we understand

00:44:23.640 --> 00:44:27.840
 like I said we understand we tried to advocate for a timing that we thought

00:44:27.840 --> 00:44:31.160
 would be in the better interest of the planning and zoning Commission but I was

00:44:31.160 --> 00:44:37.600
 told no so to me it seems like yeah this is we're doing this twice a year that's

00:44:37.600 --> 00:44:45.160
 what it seems like we're doing January and September so well and I'm happy to

00:44:45.160 --> 00:44:48.880
 have a conversation and with the city secretary's office also maybe in the

00:44:48.880 --> 00:44:52.440
 future about could we better align the timing associated with this because if

00:44:52.440 --> 00:44:57.800
 we are finding ourselves doing this twice a year then their office may not

00:44:57.800 --> 00:45:01.880
 be fully aware of that and keep in mind we have many boards and commissions that

00:45:01.880 --> 00:45:04.320
 are throughout the city and so I know they're trying to probably have a more

00:45:04.320 --> 00:45:09.080
 standardized process because they're trying to keep up with them all and so

00:45:09.080 --> 00:45:13.000
 but I know their their desires to have there should have happened in January so

00:45:13.000 --> 00:45:16.360
 but hence why we've got on the agenda tonight okay

00:45:16.360 --> 00:45:19.640
 Commissioner Smith I think in aligning with thank you chair I think in aligning

00:45:19.640 --> 00:45:24.880
 with terms for board for commission members makes more sense rather than

00:45:24.880 --> 00:45:28.240
 calendar year since essentially what will happen is that if there's ever a

00:45:28.240 --> 00:45:32.680
 time like what would happen in this September of this year then whoever is

00:45:32.680 --> 00:45:35.780
 elected chair and vice-chair at that time will then have to also do an

00:45:35.780 --> 00:45:40.840
 election January of 2023 so we're gonna and then and then depending upon it gets

00:45:40.840 --> 00:45:44.680
 elected there if their term ends and that next September then it's being done

00:45:44.680 --> 00:45:48.480
 again and so it might be a line it up with term limits that makes more sense

00:45:48.480 --> 00:45:54.800
 for those so yeah so here I think we're doing something the secretary says we

00:45:54.800 --> 00:45:57.720
 need to do so that's why it's on our agenda tonight and then Tina if you can

00:45:57.720 --> 00:46:01.680
 maybe have a future discussion down the road and see if this makes what makes

00:46:01.680 --> 00:46:10.200
 sense for future PNC's okay anything else on that okay let's move to item B

00:46:10.200 --> 00:46:16.340
 which is FP two two zero zero one two Julie did you want to come up and say a

00:46:16.340 --> 00:46:28.920
 few words about that item good evening Julie Wyatt senior planner let me pull

00:46:28.920 --> 00:46:36.880
 up the presentation all right this is a final plot within the Robeson ranch plan

00:46:36.880 --> 00:46:43.320
 development district they do have so it's for a new residential unit it is

00:46:43.320 --> 00:46:48.280
 consistent with the with the PD they do have some items that they need to

00:46:48.280 --> 00:46:53.240
 correct on that final plat so they have requested an extension to the May 5th PNC

00:46:53.240 --> 00:46:58.280
 meeting and I'll be happy to answer any questions thank you Julie any questions

00:46:58.280 --> 00:47:00.800
 on that item

00:47:00.800 --> 00:47:13.480
 commissioner Cole yes on my map I can't see property owners to the north do you

00:47:13.480 --> 00:47:21.720
 have I'm worried that this might be close to Coe Ranch okay I can pull up a

00:47:21.720 --> 00:47:29.640
 map absolutely yeah for me so I don't I want to do everything right so I'd like

00:47:29.640 --> 00:47:34.200
 to know where this is absolutely yes exactly if it's gonna be boarding our

00:47:34.200 --> 00:47:37.400
 fence lines I didn't know that absolutely I can do that yes thank you

00:47:37.400 --> 00:47:47.280
 so much anything else okay thanks Julie so you've got the next one anyway this

00:47:47.280 --> 00:47:53.440
 one is also Robeson ranch this is FP 22 13 it is just for a piece of that Robeson

00:47:53.440 --> 00:47:59.160
 Ranch Boulevard that's just extending that road a bit to the north once again

00:47:59.160 --> 00:48:03.760
 there was a preliminary plat approved on this they do have some items they do

00:48:03.760 --> 00:48:08.040
 need to correct on the final plat so they have requested an extension to the

00:48:08.040 --> 00:48:16.520
 May 25th PNC meeting any questions on this one thank you very much our next

00:48:16.520 --> 00:48:26.900
 item is PP 2 2 0 0 0 8 it is Lisa Payne's item preliminary plan I believe

00:48:26.900 --> 00:48:33.680
 we're got an extension request on but I will let her present hi Lisa good

00:48:33.680 --> 00:48:39.880
 evening Lisa pain and this is for a multifamily project that's east of I 35

00:48:39.880 --> 00:48:44.840
 it's a preliminary plot staff does recommend denial right now but the

00:48:44.840 --> 00:48:49.680
 applicant has requested an extension for 30 days to the May 25th meeting and

00:48:49.680 --> 00:48:55.080
 staff has no objection to that thanks Lisa any questions right now for Lisa on

00:48:55.080 --> 00:49:05.640
 this one thank you very much our next item on the agenda is ZCP 21 0 0 3 1

00:49:05.640 --> 00:49:17.560
 that is Karina's item hello let me just pull up my presentation

00:49:17.560 --> 00:49:30.080
 all right this will be an abbreviated presentation but I have additional

00:49:30.080 --> 00:49:33.880
 slides so if you have questions please feel free to ask me and I'll pull those

00:49:33.880 --> 00:49:38.980
 slides up so the request tonight is going to be for a site plan for razor

00:49:38.980 --> 00:49:47.360
 ranch retail center so ZCP 21 - 0 0 3 1 so just quick overview the request today

00:49:47.360 --> 00:49:51.880
 is to consider approval of a site plan for a fifty seven point seventy four

00:49:51.880 --> 00:49:59.200
 acre retail development located in the south campus of the razor ranch overlay

00:49:59.200 --> 00:50:05.080
 district specifically within the town center or our one sub area and these are

00:50:05.080 --> 00:50:12.820
 our two sub area so just to orient yourself on the screen the thoroughfare

00:50:12.820 --> 00:50:18.200
 that's going through the middle is West University on the north side is the

00:50:18.200 --> 00:50:23.040
 marketplace where y'all had that item for the Home Depot so this request is

00:50:23.040 --> 00:50:27.880
 actually on the south side of West University Drive so you'll see within

00:50:27.880 --> 00:50:33.280
 this buffered area it was it's a weird lot so I didn't want to specifically

00:50:33.280 --> 00:50:40.680
 outline it but it is located within the rr1 and south rr2 sub areas so the

00:50:40.680 --> 00:50:44.200
 reason that you're getting this request today is because the razor ranch overlay

00:50:44.200 --> 00:50:49.540
 district does require P&Z to approve all new development or site plans for all

00:50:49.540 --> 00:50:54.160
 new developments in the south campus so that's why the request is coming today

00:50:54.160 --> 00:50:58.560
 here is just a brief screenshot of what that looks like this is just the color

00:50:58.560 --> 00:51:02.720
 rendering all those specific site plans and landscape plans are in the in the

00:51:02.720 --> 00:51:08.200
 agenda packet so staff is recommending approval as it does comply with the

00:51:08.200 --> 00:51:14.440
 criteria for approval for site plans in the in the overlay district so with that

00:51:14.440 --> 00:51:18.080
 I can answer any specific questions related to the site plans landscape

00:51:18.080 --> 00:51:24.240
 plans concept plans any questions that y'all have thanks Karina do we have

00:51:24.240 --> 00:51:31.160
 questions for Karina on this item I do not see it and I know you've got the

00:51:31.160 --> 00:51:33.880
 full presentation that will say I do I won't give her the full presentation at

00:51:33.880 --> 00:51:38.280
 the regular meeting perfect thank you very much all right guys that takes us

00:51:38.280 --> 00:51:45.560
 to our public hearing item for the evening z 21 0 0 1 7 and I will bring

00:51:45.560 --> 00:51:53.040
 yep Lisa pain back up and we can get questions answered on this is recusing

00:51:53.040 --> 00:52:03.800
 himself from this item we'll see you after I'm also going to do an abbreviated

00:52:03.800 --> 00:52:07.800
 version of my presentation but y'all are welcome to ask me questions of course

00:52:07.800 --> 00:52:12.720
 about it and this is the arm squared track which is also known as Baker

00:52:12.720 --> 00:52:19.080
 Ranch and this is a property that they want to go from our art to Li the future

00:52:19.080 --> 00:52:25.760
 land use is light industrial as approved in the 2040 comprehensive plan and the

00:52:25.760 --> 00:52:32.160
 property around it as you can see in the this is the future land use map which

00:52:32.160 --> 00:52:38.520
 has light industrial all around it and light blue and the light yellow is for

00:52:38.520 --> 00:52:44.440
 low residential and then over here's the zoning map it's got rural residential

00:52:44.440 --> 00:52:48.240
 over here and the in the green light industrial here in the light blue and

00:52:48.240 --> 00:52:55.040
 this light greenish bluish color is a general office and I can take any

00:52:55.040 --> 00:53:01.080
 questions about anything the applicants also here what questions do we have for

00:53:01.080 --> 00:53:09.680
 Lisa on this I hit okay Commissioner Pruitt thank you chair I guess and maybe

00:53:09.680 --> 00:53:13.640
 the full presentation gets into this and if so that's fine I can wait until till

00:53:13.640 --> 00:53:23.760
 then looking at the map and it looks it's a the railroad track sort of on the

00:53:23.760 --> 00:53:29.120
 east side of it right and so I was trying to envision where the the mobility

00:53:29.120 --> 00:53:32.780
 of I'm assuming light industrial may have some truck traffic and that sort of

00:53:32.780 --> 00:53:35.840
 thing might might go so if that's something that we're already planning on

00:53:35.840 --> 00:53:40.080
 covering that's that's fine I'll wait if it's not do we have any information

00:53:40.080 --> 00:53:44.520
 about that so I was gonna let the applicant do a lot of that stuff because

00:53:44.520 --> 00:53:47.880
 okay you know the plan itself you know this is strictly for the zoning right

00:53:47.880 --> 00:53:50.400
 not actually planned they do have a concept plan that was included in your

00:53:50.400 --> 00:53:53.360
 packet but I didn't want to say any definite about what would actually

00:53:53.360 --> 00:54:00.000
 happen but their plan is to come off of mosh branch also have an entrance on

00:54:00.000 --> 00:54:05.920
 lovers Lane that future entrance on lovers Lane is supposed to 288 the

00:54:05.920 --> 00:54:11.920
 future 28 supposed to go across there to be the new access there but mosh branch

00:54:11.920 --> 00:54:17.600
 is supposed to be their main entrance exit they purposely are not having any

00:54:17.600 --> 00:54:25.240
 direct access to Hampton okay thank you yes but it's not like you can stop

00:54:25.240 --> 00:54:29.560
 people from using Hampton no of course any of the other streets off of

00:54:29.560 --> 00:54:35.800
 university to get that way to expand on that a little bit and the applicant has

00:54:35.800 --> 00:54:41.680
 spoken with the city and their their plan is to rather than it improving

00:54:41.680 --> 00:54:46.560
 Hampton with their impact these to improve mosh branch instead going down

00:54:46.560 --> 00:54:52.640
 to 380 to encourage the 18 wheelers to use that route to go directly from 380

00:54:52.640 --> 00:54:57.120
 to mosh branch directly into the development rather than going another

00:54:57.120 --> 00:55:07.680
 way through the neighborhood right other questions before I ask a few where where

00:55:07.680 --> 00:55:13.920
 do we stand with the parcel of land that is not being considered for rezoning do

00:55:13.920 --> 00:55:18.760
 you have any updates on that so the latest that that part that piece of

00:55:18.760 --> 00:55:24.720
 property originally the applicant proposed to the residents that he held

00:55:24.720 --> 00:55:30.040
 neighborhood meeting with that he would build a park there and then dedicated to

00:55:30.040 --> 00:55:36.360
 the city basically to do that as a way to create a permanent buffer so they'd

00:55:36.360 --> 00:55:42.520
 be that much further away from any warehouse use as the time has gone on

00:55:42.520 --> 00:55:48.720
 people have met the most recent is that the people that live around there are

00:55:48.720 --> 00:55:53.960
 not interested in a park they would rather have it just be ag land there is

00:55:53.960 --> 00:56:00.680
 someone who is willing to buy that property from the applicant and just

00:56:00.680 --> 00:56:06.160
 have it just ag with cows and that's it the applicant has said that they are

00:56:06.160 --> 00:56:11.800
 willing to do a deed restriction that would only allow our uses for 25 years

00:56:11.800 --> 00:56:17.520
 and so that's where that stands on that but the applicant is willing he's still

00:56:17.520 --> 00:56:23.680
 willing to do the park if that's what the city would like but he also wants to

00:56:23.680 --> 00:56:32.680
 protect the residents that live there um yeah the issue that I'm having the

00:56:32.680 --> 00:56:37.160
 biggest issue that I'm having here is why wouldn't pursue maybe like a PD with

00:56:37.160 --> 00:56:43.080
 this particular parcel I get how pretty it fits in with future land use and the

00:56:43.080 --> 00:56:48.280
 colors and all that and ally but you know we're dealing with a very special

00:56:48.280 --> 00:56:54.400
 community in our city that's been there for a very long time and and I'm

00:56:54.400 --> 00:56:58.640
 interested in in the protection that that they are getting and if we open

00:56:58.640 --> 00:57:05.240
 this up to just a straight rezoning to Li yes their concept plan looks very nice

00:57:05.240 --> 00:57:10.580
 we have no idea if that's actually going to develop or not or even if that

00:57:10.580 --> 00:57:14.680
 develop and down the road becomes something else I mean it opens it up to

00:57:14.680 --> 00:57:21.520
 everything that Li can allow so I guess I just want some feedback from you as

00:57:21.520 --> 00:57:26.400
 you were reviewing this why we didn't maybe consider that or maybe it was

00:57:26.400 --> 00:57:32.160
 considered and talked about I don't know and for this there we didn't find a

00:57:32.160 --> 00:57:37.640
 reason for that to go to PD as as you might have one or two reasons that that

00:57:37.640 --> 00:57:43.560
 maybe you want them sorry my words um basically there they don't have a whole

00:57:43.560 --> 00:57:46.800
 list of things that they're trying to change about the zoning like what they

00:57:46.800 --> 00:57:52.920
 want to do is going to comply with the zoning that they're requesting it's not

00:57:52.920 --> 00:57:56.400
 like they're going to change many things about the landscaping or the building

00:57:56.400 --> 00:58:02.480
 design or anything like that so what they want to do does comply with it I

00:58:02.480 --> 00:58:06.960
 think this is probably just coming up because of the that extra piece of

00:58:06.960 --> 00:58:11.600
 property that is it going to be parked is it going to be ag how much is it

00:58:11.600 --> 00:58:16.440
 going to actually protect the neighbors or not well for me it comes up because

00:58:16.440 --> 00:58:20.240
 with the zoning change I mean that a concept plan is not tied to a zoning

00:58:20.240 --> 00:58:24.040
 change the zoning changes is changed it really doesn't matter what kind of

00:58:24.040 --> 00:58:28.240
 presentation we get even tonight on the concept because it's not tied to what

00:58:28.240 --> 00:58:34.320
 we're doing that's that's why I'm bringing it up because if it doesn't

00:58:34.320 --> 00:58:40.360
 make for whatever reason and that happens all the time what could it

00:58:40.360 --> 00:58:46.560
 possibly be if it doesn't happen to be this concept plan so I'll leave it at

00:58:46.560 --> 00:58:54.520
 that Commissioner Villarreal I guess my question is about the the I know he

00:58:54.520 --> 00:59:00.400
 mentioned that they would rather have pasture over park but who did he speak

00:59:00.400 --> 00:59:05.240
 to how many neighbors responded and said they would rather have a pasture than a

00:59:05.240 --> 00:59:09.200
 park that's kind of confusing me a bit so and Smith who lives in the

00:59:09.200 --> 00:59:13.600
 neighborhood and I've been told is kind of the leader I've been told that she

00:59:13.600 --> 00:59:17.560
 went door-to-door and talked to 40 of the neighbors and 39 of them said that

00:59:17.560 --> 00:59:21.040
 they would rather have the pasture than the park they're the reason that at

00:59:21.040 --> 00:59:25.080
 first the park sounded good the more they thought about it the more that they

00:59:25.080 --> 00:59:30.720
 were concerned about possible homeless tent camps also parking they did not

00:59:30.720 --> 00:59:34.560
 want a parking lot at the park but they also did not want anyone parking along

00:59:34.560 --> 00:59:38.920
 Hampton or their neighborhood streets so basically that would make it where's a

00:59:38.920 --> 00:59:42.720
 park just for them to walk to which is fine that would make it within the 10

00:59:42.720 --> 00:59:49.280
 mile radius for the parks which is part of their plan but so that

00:59:49.280 --> 00:59:54.720
 eventually just became we don't want it to become a problem in one way or the

00:59:54.720 --> 01:00:00.560
 other so we'd rather just stay the way that it is I think the issue from how I

01:00:00.560 --> 01:00:04.480
 understand it is they didn't want a public park because that that's in it's

01:00:04.480 --> 01:00:07.880
 inviting more traffic through the neighborhood it's invite I mean it's it's

01:00:07.880 --> 01:00:13.960
 it's not really helping the rural way that they have been living yeah the

01:00:13.960 --> 01:00:18.800
 proposed part was simply a linear park that did not have gathering spaces but

01:00:18.800 --> 01:00:23.360
 it still could invite other people that don't live in the area to come there of

01:00:23.360 --> 01:00:31.140
 course anything else thank you Tina did you have something to add I think I

01:00:31.140 --> 01:00:35.680
 interrupted you I just was when you mentioned something and was wanting to

01:00:35.680 --> 01:00:39.560
 get some clarification on so I know you expressed concern or made a statement

01:00:39.560 --> 01:00:43.360
 regarding concern maybe some of the land uses that are allowed within the light

01:00:43.360 --> 01:00:48.680
 industrial district so are there uses in particular or just the the potential

01:00:48.680 --> 01:00:53.480
 intensity just was hoping to maybe learn a little more from you about that well I

01:00:53.480 --> 01:00:59.560
 mean there yeah there were several from yeah other I have a list where housing

01:00:59.560 --> 01:01:07.120
 and food processing and okay auto repair and gas stations and I mean there's

01:01:07.120 --> 01:01:11.520
 several I mean I I don't have them all in front of you no no no no no no well

01:01:11.520 --> 01:01:18.840
 and I want to make sure because my what I was reading between the lines was

01:01:18.840 --> 01:01:22.440
 concern regarding potential intensity of land uses because you're right and and I

01:01:22.440 --> 01:01:25.000
 appreciate you looking at this holistically because when we have a

01:01:25.000 --> 01:01:29.480
 request to rezone property to a certain district while the applicant may have a

01:01:29.480 --> 01:01:32.560
 desire of focusing on one particular land use to be able to develop in this

01:01:32.560 --> 01:01:36.040
 case potentially warehouses on the property the LA district does allow for

01:01:36.040 --> 01:01:40.560
 a wider variety of uses so you know as Lisa mentioned we did not consider plan

01:01:40.560 --> 01:01:43.940
 development district the applicant was requesting a straight zoning associated

01:01:43.940 --> 01:01:48.560
 with this the uses that are allowed within the light industrial district are

01:01:48.560 --> 01:01:53.300
 uses that that are you know commonly found when property their zone light

01:01:53.300 --> 01:01:58.000
 industrial the the proposed rezoning is consistent with our comprehensive plan

01:01:58.000 --> 01:02:03.320
 recommendations in that area but so we did not you know we did not consider

01:02:03.320 --> 01:02:10.000
 trying to limit the uses within that area the if the Commission is concerned

01:02:10.000 --> 01:02:13.260
 regarding the uses that are allowed within the light industrial zoning

01:02:13.260 --> 01:02:17.640
 district you know another option is to can consider a different zoning category

01:02:17.640 --> 01:02:21.680
 for that property one of the things that we were discussing today as a result of

01:02:21.680 --> 01:02:25.660
 some of the inquiries were receiving was the general office district the general

01:02:25.660 --> 01:02:28.540
 office district does allow for warehousing operations associated with

01:02:28.540 --> 01:02:33.760
 that it's considered of you know a more restrictive or lesser intensive uses I

01:02:33.760 --> 01:02:37.520
 don't know if we've had an opportunity to have a conversation with the

01:02:37.520 --> 01:02:40.680
 applicant to fully understand the uses that are allowed in geo whether or not

01:02:40.680 --> 01:02:46.760
 that would be meet their needs as well given that they've requested the LI the

01:02:46.760 --> 01:02:51.200
 general office district does have some more specific site design considerations

01:02:51.200 --> 01:02:54.000
 that would come into play which from what I understand in talking with the

01:02:54.000 --> 01:02:58.920
 team it's predominantly associated with landscaping greater tree coverage

01:02:58.920 --> 01:03:03.480
 associated with it and I think it's about a 10% increase if if member

01:03:03.480 --> 01:03:07.520
 searchman correctly associated with that but geo district does allow for

01:03:07.520 --> 01:03:12.880
 warehousing distribution type uses so I'm not sure if if that is something

01:03:12.880 --> 01:03:17.560
 that the that the Commission is deemed more favorable of I know we've had some

01:03:17.560 --> 01:03:20.240
 other light industrial zoning cases that have come before you where you've

01:03:20.240 --> 01:03:25.640
 requested consideration of the geo district and instead of the LI so the

01:03:25.640 --> 01:03:29.600
 you know again we evaluated this based upon what the applicant submitted it was

01:03:29.600 --> 01:03:34.160
 consistent with our comprehensive plan the the unique element associated with

01:03:34.160 --> 01:03:38.280
 this request was the fact that the applicant was proposing to include that

01:03:38.280 --> 01:03:42.400
 buffer on the south side but it was not being included as part of this zoning

01:03:42.400 --> 01:03:46.120
 request so ultimately being that it's not part of that you know it would

01:03:46.120 --> 01:03:50.440
 retain its existing zoning that's in place and until some future owner decided

01:03:50.440 --> 01:03:53.720
 to come through and do something with the property we thought we had a

01:03:53.720 --> 01:03:58.840
 potential solution with respect to a public park being there and and keep in

01:03:58.840 --> 01:04:02.560
 mind not necessarily all public parks are actively programmed for recreational

01:04:02.560 --> 01:04:06.240
 purposes this may have been something a little more linear in nature given the

01:04:06.240 --> 01:04:11.160
 the way the the strip of land was being left but obviously the residents have

01:04:11.160 --> 01:04:15.680
 expressed a concern associated with that so our our analysis is based upon what

01:04:15.680 --> 01:04:21.160
 is shown outlined in yellow on that aerial and the the buffer that was just

01:04:21.160 --> 01:04:24.120
 an additional benefit especially if it was going to be dedicated as a public

01:04:24.120 --> 01:04:27.480
 part but at the end of the day we focused our analysis on on the area of

01:04:27.480 --> 01:04:31.960
 the request and I'll add to that that I did speak with the applicant about the

01:04:31.960 --> 01:04:35.960
 possibility of going to a different zoning district if that came up tonight

01:04:35.960 --> 01:04:41.440
 and I'll let him expand on it later on but he did say that that's not something

01:04:41.440 --> 01:04:46.520
 that they would be interested in the developer needs their requirement is

01:04:46.520 --> 01:04:50.400
 that they have at least an industrial zoning or they're not their company does

01:04:50.400 --> 01:04:54.600
 not allow them to construct on that property okay so not that this is tied

01:04:54.600 --> 01:04:58.960
 to a specific developer it's just the land but the one that's planning to come

01:04:58.960 --> 01:05:02.840
 in again who's requesting it sure yeah that makes sense and obviously they will

01:05:02.840 --> 01:05:07.680
 be here with a presentation and you will have a fuller presentation okay for work

01:05:07.680 --> 01:05:12.040
 session do we have any other questions to work out Commissioner Perrett thank

01:05:12.040 --> 01:05:18.480
 you I guess coming going back to what chair Ellis mentioned before about how

01:05:18.480 --> 01:05:23.560
 this is just the zoning and then there's the strip to the south that's separate

01:05:23.560 --> 01:05:29.480
 right it may help our discussions go a little bit smoother if we understand

01:05:29.480 --> 01:05:36.760
 what the options are in order to ensure both of those pieces happen options for

01:05:36.760 --> 01:05:43.560
 what Commissioner Perrett well for for our direction going forward right it in

01:05:43.560 --> 01:05:47.560
 other words right now it's it's a concept that it sounds like the the

01:05:47.560 --> 01:05:51.280
 applicant would be amenable to a deed restriction and then there's some plans

01:05:51.280 --> 01:05:58.080
 in place like we're not really discussing the parcel to the southeast in

01:05:58.080 --> 01:06:02.920
 this in what we're talking in what we're voting on today I just wondered I just

01:06:02.920 --> 01:06:07.480
 wanted to know where we stood but that's not anything that's going to be handled

01:06:07.480 --> 01:06:17.800
 in our decision today okay understood thank you anything else okay thanks Lisa

01:06:17.800 --> 01:06:22.480
 thank you we'll see you at the meeting okay okay that takes us to the end of

01:06:22.480 --> 01:06:27.560
 our agenda so I will close our work session at 5 36 p.m. and we will be in

01:06:27.560 --> 01:06:34.560
 council chambers at 630 thanks good evening and welcome to the city of

01:06:34.560 --> 01:06:40.280
 Denton's planning and zoning Commission meeting for Wednesday April 27th 2022 I

01:06:40.280 --> 01:06:46.400
 will call us with a quorum present to order at 630 p.m. our first item of

01:06:46.400 --> 01:06:52.160
 business is say the Pledge of Allegiance to the US and Texas flags

01:06:57.560 --> 01:07:04.480
 Republic for which it stands one nation under God indivisible with liberty and

01:07:04.480 --> 01:07:24.440
 justice for all our next item on the agenda is the approval of the planning

01:07:24.440 --> 01:07:29.080
 zoning mission minutes from April 13th Commissioner Smith make a motion to

01:07:29.080 --> 01:07:34.100
 approve Commissioner Villarreal we have a first and a second for approval of the

01:07:34.100 --> 01:07:44.720
 minutes from April 13th any discussion okay let's vote on the board please that

01:07:44.720 --> 01:07:50.400
 motion carries seven zero that takes us to our individual consideration items

01:07:50.400 --> 01:07:56.960
 taking us to 3a and that is the election of chair and vice chair for the planning

01:07:56.960 --> 01:08:00.840
 and zoning Commissioner Commissioner Smith make a motion to appoint Margie

01:08:00.840 --> 01:08:05.240
 Ellis chair for the plan zoning Commission thank you Commissioner

01:08:05.240 --> 01:08:09.800
 Smith Commissioner Anderson I second we have a first and a second any other

01:08:09.800 --> 01:08:24.840
 nominations any discussion okay we can vote on the board please motion carries

01:08:24.840 --> 01:08:33.280
 seven zero thank you Commissioner Pruitt move to appoint Tim Smith as vice chair

01:08:33.280 --> 01:08:39.280
 Commissioner Cole second we have a first and a second to appoint Commissioner

01:08:39.280 --> 01:08:47.320
 Smith vice chair of PNC any discussion other nominations okay let's vote on the

01:08:47.320 --> 01:08:59.800
 board please motion carries seven zero our next item is FP 2 2 0 0 1 2 and I

01:08:59.800 --> 01:09:09.400
 will invite Julie Wyatt up to the podium hi Julie all right hi I'm Julie Wyatt

01:09:09.400 --> 01:09:15.840
 senior planner with the City of Denton and I am presenting FP 22 - 0 0 1 2 this

01:09:15.840 --> 01:09:20.060
 is a single-family residential phase within the ropes and ranch plan

01:09:20.060 --> 01:09:25.120
 development they do have some items they still need to work through and so they

01:09:25.120 --> 01:09:29.600
 have requested an extension to the May 25th meeting and staff has no objection

01:09:29.600 --> 01:09:36.640
 thank you Julie any questions for Julie Commissioner Smith make a motion to

01:09:36.640 --> 01:09:41.200
 approve the extension to date certain of May 25th 2022 Commissioner Cole second

01:09:41.200 --> 01:09:45.080
 okay we've got a first and a second to approve that extension request to a date

01:09:45.080 --> 01:09:55.800
 certain of May 25th any discussion okay let's vote on the board please that

01:09:55.800 --> 01:10:03.320
 motion carries seven zero taking us to FP 2 2 0 0 1 3 hello Julie all right

01:10:03.320 --> 01:10:07.800
 we're gonna stay in the ropes and ranch community this is for a final plat for a

01:10:07.800 --> 01:10:14.040
 section of the Robeson Boulevard roadway this is a private street within the plan

01:10:14.040 --> 01:10:18.200
 development once again they have some items they still need to correct on this

01:10:18.200 --> 01:10:22.920
 final plat and so staff they have requested an extension to the May 25th

01:10:22.920 --> 01:10:28.760
 meeting and staff has no objection thank you Julie any questions for Julie

01:10:28.760 --> 01:10:33.480
 thank you Commissioner Villarreal I move to approve the extension to a date

01:10:33.480 --> 01:10:38.160
 certain of May 25th 2022 okay we've got a first to approve that extension request

01:10:38.160 --> 01:10:41.560
 Commissioner Anderson second we've got a first and a second to approve the

01:10:41.560 --> 01:10:47.600
 extension request to a date certain of May 25th any discussion okay let's vote

01:10:47.600 --> 01:10:57.200
 on the board please that motion carries seven zero that will take us to 3d PP 2

01:10:57.200 --> 01:11:04.800
 2 0 0 0 8 I'll invite Lisa pain up for a presentation hi Lisa good evening

01:11:04.800 --> 01:11:09.880
 commissioners Lisa pain principal player for the city of Denton this is for a

01:11:09.880 --> 01:11:14.960
 preliminary plat for a multifamily development that's east I'm sorry west

01:11:14.960 --> 01:11:21.800
 of I 35 e the staff recommends denial on this plot as it has not yet met the

01:11:21.800 --> 01:11:27.120
 criteria for approval but the applicant has requested an extension to May 25th

01:11:27.120 --> 01:11:35.760
 PNZ meeting and stuff has no objection any questions for Lisa on this item do

01:11:35.760 --> 01:11:39.200
 not see any Lisa thank you Commissioner Villarreal I move to approve the

01:11:39.200 --> 01:11:44.400
 extension to a date certain of May 25th 2022 Commissioner Smith second okay we've

01:11:44.400 --> 01:11:47.880
 got a first and a second to approve the extension request to a date certain of

01:11:47.880 --> 01:11:57.880
 May 25th any discussion okay seeing none let's vote on the board please that

01:11:57.880 --> 01:12:07.520
 motion carries seven zero that will take us to 3e ZCP 2 1 0 0 31 hi Karina

01:12:07.520 --> 01:12:12.720
 right good evening Karina Maldonado transportation planner let me just pull

01:12:12.720 --> 01:12:21.160
 up my presentation thank you all right good evening the request today is for

01:12:21.160 --> 01:12:28.160
 ZCP 2 1 dash 0 0 3 1 this is for the razor ranch retail center so just very

01:12:28.160 --> 01:12:32.560
 briefly a summary the request the request today is to consider approval of

01:12:32.560 --> 01:12:37.120
 a site plan for a fifty seven point seven four acre retail development

01:12:37.120 --> 01:12:42.200
 located in the south campus of the razor ranch overlay district specifically the

01:12:42.200 --> 01:12:49.640
 town center rr1 sub area and south rr2 sub areas of the overlay district this

01:12:49.640 --> 01:12:53.440
 is coming before you today because the razor ranch overlay district requires P&Z

01:12:53.440 --> 01:12:59.120
 approval for all new developments in the south campus so that is here located on

01:12:59.120 --> 01:13:06.120
 the south side of West University Drive so just going over the site very quickly

01:13:06.120 --> 01:13:13.320
 it is currently approximately a 57 point fifty seven point seventy four acre lot

01:13:13.320 --> 01:13:19.840
 so that is lot 10 r2 of the razor ranch town center addition it's located within

01:13:19.840 --> 01:13:25.920
 two sub areas as you can see on the screen that is this general location at

01:13:25.920 --> 01:13:32.680
 the southeast corner of I-35 and West University Drive the specific lot is kind

01:13:32.680 --> 01:13:37.320
 of located here I kind of like to refer to it as a stingray lot and it looks

01:13:37.320 --> 01:13:42.840
 sort of like a little stingray it does have a base zoning based in the 2002

01:13:42.840 --> 01:13:49.080
 Denton Development Code and zoning which is the RCCD district that district does

01:13:49.080 --> 01:13:55.160
 permit retail restaurant professional services within this area of the the

01:13:55.160 --> 01:14:01.720
 overlay district per the razor ranch ordinances specifically ordinance 2016

01:14:01.720 --> 01:14:09.400
 - zero one seven the subject site must comply with exhibits c1 d1 and e1 of the

01:14:09.400 --> 01:14:15.280
 razor ranch overlay district this site plan consideration does include elements

01:14:15.280 --> 01:14:23.800
 including a site plan a landscape plan as well as four sited elevations so just

01:14:23.800 --> 01:14:27.960
 going over the site plan very briefly on the screen you'll see the actual

01:14:27.960 --> 01:14:34.880
 entirety of lot 10 r2 however the proposal currently is for phase one of

01:14:34.880 --> 01:14:42.560
 that development so as you can see the two sub areas are shown the south rr2

01:14:42.560 --> 01:14:48.760
 sub areas is that which is shown in yellow in pink would be the town center

01:14:48.760 --> 01:14:54.360
 sub area and then the subject site or phase one of the subject site is located

01:14:54.360 --> 01:15:02.320
 within that dashed area so phase one does propose or it does encompass 31.44

01:15:02.320 --> 01:15:06.600
 acres of the entire lot so it's not the entirety of the law but just a portion of

01:15:06.600 --> 01:15:11.440
 it on the northern side it does include eight buildings totaling a maximum

01:15:11.440 --> 01:15:15.440
 building footprint of two hundred and ninety nine thousand eight hundred and

01:15:15.440 --> 01:15:20.320
 ninety four square feet that is the maximum square footage so you'll see

01:15:20.320 --> 01:15:23.760
 there's kind of a dashed line the buildings that are shown look slightly

01:15:23.760 --> 01:15:27.440
 smaller but they intend to have some sort of expansion so that square footage

01:15:27.440 --> 01:15:32.680
 is related to the maximum square footage all buildings would have would be less

01:15:32.680 --> 01:15:36.960
 than 46 feet maximum height the overlay district allows a hundred feet so

01:15:36.960 --> 01:15:42.880
 they're well below those requirements to serve the development they're proposing

01:15:42.880 --> 01:15:47.120
 one thousand two hundred ninety nine vehicular spaces to accommodate the

01:15:47.120 --> 01:15:51.720
 retail or other permitted uses which would include restaurant and professional

01:15:51.720 --> 01:15:55.680
 services the reason why you're seeing that listed even though this is a retail

01:15:55.680 --> 01:16:01.240
 development is just to let you know that you know in the future if this develops

01:16:01.240 --> 01:16:04.200
 and they have their tenants there's always the possibility that the tenants

01:16:04.200 --> 01:16:08.760
 would change and these are the permitted uses and it would not affect to their

01:16:08.760 --> 01:16:14.760
 total proposed parking so just wanted to make that clarification the razor ranch

01:16:14.760 --> 01:16:19.040
 overlay district does permit the minimum parking to be exceeded so there's no

01:16:19.040 --> 01:16:22.960
 maximum and so you'll see that what they're proposing is above the minimum

01:16:22.960 --> 01:16:30.800
 requirement last they are taking access from I-35 from the frontage road of I-35

01:16:30.800 --> 01:16:35.320
 that's an existing driveway as well as an existing driveways off of West

01:16:35.320 --> 01:16:40.200
 University Drive and so as you can see on here there's one two and three

01:16:40.200 --> 01:16:46.240
 driveway accesses that are currently existing this is the town center signal

01:16:46.240 --> 01:16:49.960
 that currently exists today so that would be their main drive going into the

01:16:49.960 --> 01:16:55.960
 site other things to consider the overlay district for this area does

01:16:55.960 --> 01:17:01.960
 require bike-ped connectivity within the site so what you'll see here I should

01:17:01.960 --> 01:17:06.200
 have highlighted it better but I'll kind of show you with my mouse through the

01:17:06.200 --> 01:17:12.200
 center of the site is the main drive there is an east-west main drive as well

01:17:12.200 --> 01:17:16.240
 as one on the the western side those have all been widened to 30 feet to

01:17:16.240 --> 01:17:21.480
 accommodate cyclists in that area as well as signage there's additional

01:17:21.480 --> 01:17:27.960
 pedestrian connections within the retail site and it stubs out to the south so

01:17:27.960 --> 01:17:32.760
 that future phase two would continue that connectivity and eventually serve

01:17:32.760 --> 01:17:37.800
 the multifamily developments that are existing in the razor ranch overlay area

01:17:37.800 --> 01:17:43.440
 so another key thing to note is phase two will submit a separate zoning

01:17:43.440 --> 01:17:47.880
 compliance plan so you'll see that in the future once they submit for for that

01:17:47.880 --> 01:17:53.400
 application and a key thing to note is that lot coverage this is following the

01:17:53.400 --> 01:18:00.200
 2002 code lot coverage would be combined for phase one and phase two so you'll

01:18:00.200 --> 01:18:06.360
 see that the maximum lot coverage is 90% and they're not exceeding that

01:18:06.360 --> 01:18:09.600
 currently but the two phases would combine to make sure that they don't

01:18:09.600 --> 01:18:15.600
 exceed that so jumping into the landscape plan I've just provided you

01:18:15.600 --> 01:18:19.880
 the color rendering because it was easier to show than the multiple plan

01:18:19.880 --> 01:18:26.760
 sheets but they are proposing 31% landscape area 13% tree canopy coverage

01:18:26.760 --> 01:18:33.280
 so far on the entire lot again these are these are based on the lot area versus

01:18:33.280 --> 01:18:38.800
 the phase area so one thing to note is that the minimum tree canopy required is

01:18:38.800 --> 01:18:45.040
 25% and they'll be required to meet that minimum with phase one and phase two so

01:18:45.040 --> 01:18:50.040
 you'll see that it's less than 25 percent however combined they would they

01:18:50.040 --> 01:18:54.800
 would be required to meet that additionally they're providing as

01:18:54.800 --> 01:18:58.400
 required by the ordinance at least they're providing nineteen point five

01:18:58.400 --> 01:19:03.840
 percent patio and open space these are kind of spaces located between the

01:19:03.840 --> 01:19:09.360
 buildings so there would be seating areas the pedestrian areas count towards

01:19:09.360 --> 01:19:15.920
 their open space eight foot sidewalks with kind of benches and seating so

01:19:15.920 --> 01:19:20.520
 you'll see that each building has a kind of a wider pedestrian area and that

01:19:20.520 --> 01:19:25.520
 counts towards our open space as with the other requirements phase one and

01:19:25.520 --> 01:19:31.280
 phase two will need to maintain a minimum of 15% so you'll see while

01:19:31.280 --> 01:19:35.360
 they're showing nineteen point five percent when phase two comes in they'll

01:19:35.360 --> 01:19:40.680
 show you an updated percentage that needs to maintain the minimum phase one

01:19:40.680 --> 01:19:44.920
 does comply with all other requirements of the landscape ordinance or design

01:19:44.920 --> 01:19:49.000
 standards which includes that eight eleven percent of the parking lot is

01:19:49.000 --> 01:19:54.560
 landscaped they're exceeding parking lot canopy and that 21% of the parking lot

01:19:54.560 --> 01:20:00.480
 has tree canopy and street trees are provided as required so this is just a

01:20:00.480 --> 01:20:04.480
 couple elevations of the proposed development of the eight buildings I

01:20:04.480 --> 01:20:10.680
 didn't provide all of them but they're fairly similar in style so the main

01:20:10.680 --> 01:20:15.800
 area that key kind of once you go into the main drive what you'll see is is

01:20:15.800 --> 01:20:22.720
 this portion here the main drive cuts through between the proposed Macy's and

01:20:22.720 --> 01:20:27.160
 at home and again this is just for conceptual elevations the tenants may

01:20:27.160 --> 01:20:31.240
 change in the future so don't don't want anybody to get hung up on the the

01:20:31.240 --> 01:20:35.640
 tenants but this is what the proposed elevations would look like coming into

01:20:35.640 --> 01:20:42.160
 the site and so with that there is criteria for approval for site plans for

01:20:42.160 --> 01:20:45.680
 the razor ranch overlay district are shown on this on the screen I won't go

01:20:45.680 --> 01:20:50.040
 through them specifically but the site plan does comply with the zoning for

01:20:50.040 --> 01:20:55.520
 this area which is exhibit b1 it meets all lot dimension requirements of the

01:20:55.520 --> 01:21:00.000
 overlay district the site plan and landscape plan do not adversely affect

01:21:00.000 --> 01:21:03.960
 adjacent neighborhoods since it's central to the overlay district there

01:21:03.960 --> 01:21:07.440
 it's already built out with retail and restaurants they're not actually

01:21:07.440 --> 01:21:12.200
 impacting them they are providing vehicular pedestrian bicycle connection

01:21:12.200 --> 01:21:17.480
 to West University Drive where there's existing facilities as well as into the

01:21:17.480 --> 01:21:22.620
 razor ranch district as a whole and so the site and landscape plans also meet

01:21:22.620 --> 01:21:29.420
 all the landscape architectural design standards of the overlay district so

01:21:29.420 --> 01:21:33.760
 there is no public notification required for razor ranch overlay district site

01:21:33.760 --> 01:21:38.320
 plans so you didn't see that in your packet but staff does recommend

01:21:38.320 --> 01:21:42.080
 approval of this request as it does meet all the requirements of the overlay

01:21:42.080 --> 01:21:47.040
 district and with that I can answer any questions that you have thank you Karina

01:21:47.040 --> 01:21:59.120
 any questions I do not see any thank you we did receive one e-comment form filled

01:21:59.120 --> 01:22:06.960
 out on our website in support of this project and I also do have a card wishing

01:22:06.960 --> 01:22:14.640
 to speak on this item and I believe that is the applicant Amy how are you

01:22:17.080 --> 01:22:23.000
 good evening commissioners Amy Bissette 97 land company 109 North Elm Denton 76

01:22:23.000 --> 01:22:28.280
 201 I have quite a bit of detail prepared in these slides but I'm just

01:22:28.280 --> 01:22:31.880
 gonna kind of just walk you through them very quickly and then if you do have

01:22:31.880 --> 01:22:36.720
 questions or would like to go into detail on any of them I'd be happy to do

01:22:36.720 --> 01:22:41.600
 so I also want to note that Rick Coe is sitting behind me here he represents

01:22:41.600 --> 01:22:46.200
 Fidelis who is the property owner and developer of this site and the remainder

01:22:46.200 --> 01:22:53.640
 of the town center portion that will come in in phase 2 so as you know razor

01:22:53.640 --> 01:22:58.320
 ranch is its own animal in terms of zoning it's got an old overlay district

01:22:58.320 --> 01:23:04.080
 that was established in 2008 and encompasses 400 acres and the majority

01:23:04.080 --> 01:23:08.600
 of the 400 acres at this point I would say is developed or is pending

01:23:08.600 --> 01:23:13.200
 development at this point in time the majority of what's left is on the south

01:23:13.200 --> 01:23:19.560
 side of University Drive and the two main property owners and developers

01:23:19.560 --> 01:23:24.040
 within that that south portion are Fidelis and Allegiance Hillview and we

01:23:24.040 --> 01:23:29.760
 are focused today on the property that Fidelis owns and Karina went through

01:23:29.760 --> 01:23:32.760
 this but I just kind of wanted to highlight where this is located in

01:23:32.760 --> 01:23:37.360
 relation to the rest of the razor ranch development along University you've got

01:23:37.360 --> 01:23:42.000
 the in-and-out up here and some retail strip center development and then south

01:23:42.000 --> 01:23:46.280
 of the site you've got the convention center you've got I-35 on the west

01:23:46.280 --> 01:23:50.880
 Karina walked through the site plan but just kind of wanted to show you how that

01:23:50.880 --> 01:23:57.520
 that overlays with the aerial that you were just viewing and just briefly want

01:23:57.520 --> 01:24:01.560
 to talk about the areas of the razor ranch overlay that govern this site and

01:24:01.560 --> 01:24:06.400
 specifically the the consideration of the site plan and the specifics

01:24:06.400 --> 01:24:11.120
 associated with it and the overlay ordinance itself provides the criteria

01:24:11.120 --> 01:24:16.840
 to approve the site plan and also the the dimensional and development standards

01:24:16.840 --> 01:24:24.640
 for the rr1 and rr2 sub areas and the exhibit B1 concept plan goes into detail

01:24:24.640 --> 01:24:31.280
 of what the allowable land uses are for each area and exhibit C1 is really where

01:24:31.280 --> 01:24:36.200
 the detail and the meat comes in which is the the expectations of the site plan

01:24:36.200 --> 01:24:43.360
 orientation and the architectural architectural elements so Karina

01:24:43.360 --> 01:24:48.360
 already walked through the criteria for site plan approval and the development

01:24:48.360 --> 01:24:53.000
 standards we do meet or exceed all of those and I do want to point out as

01:24:53.000 --> 01:24:57.720
 Karina did that the 25% minimum tree canopy is for the entire lot and we're

01:24:57.720 --> 01:25:02.960
 only developing 30 of the 57 acres today so that is a cumulative total that will

01:25:02.960 --> 01:25:09.000
 have to be met and the remainder of in phase two the exhibit C1 architectural

01:25:09.000 --> 01:25:11.640
 standards there's a couple of main elements that I just want to point out

01:25:11.640 --> 01:25:16.520
 that we've spent a lot of time really working on demonstrating compliance and

01:25:16.520 --> 01:25:20.640
 a superior development for this project and the first are related to site

01:25:20.640 --> 01:25:25.600
 orientation and circulation specifically not just vehicular but pedestrian and

01:25:25.600 --> 01:25:30.560
 bike circulation and that the the development is oriented around a central

01:25:30.560 --> 01:25:37.640
 spine element and which I'll show you momentarily this that this does this

01:25:37.640 --> 01:25:42.320
 this particular slide highlights the vehicular circulation and as Karina

01:25:42.320 --> 01:25:47.960
 mentioned we do have widened main drives to accommodate bicyclists and

01:25:47.960 --> 01:25:53.520
 pedestrians in addition to vehicles this which was included in your backup shows

01:25:53.520 --> 01:26:01.600
 the the bike paths that provide access to all all aspects of the development as

01:26:01.600 --> 01:26:08.640
 well as connectivity to University Drive and provide bike bike parking bike racks

01:26:08.640 --> 01:26:15.720
 throughout the development as well this exhibit is specific to pedestrian

01:26:15.720 --> 01:26:20.600
 circulation and runs concurrent with with the bicycle circulation and the

01:26:20.600 --> 01:26:28.720
 widened facilities to accommodate both the spine element that is a key focus of

01:26:28.720 --> 01:26:35.520
 this development is the main drive that comes in off of University Drive includes

01:26:35.520 --> 01:26:44.520
 enhanced green space with multi-use trails benches and patterned concrete a

01:26:44.520 --> 01:26:50.280
 number of elements that really enhanced that main entryway coming in to the

01:26:50.280 --> 01:26:55.480
 to the development in the site and I've even got a 3d rendering here to show you

01:26:55.480 --> 01:26:58.800
 kind of what that looks like coming in approaching the main from the main

01:26:58.800 --> 01:27:08.280
 entrance the other main part of exhibit see one that we've we've worked hard to

01:27:08.280 --> 01:27:13.000
 comply with is related to the building design as you all know there's a lot of

01:27:13.000 --> 01:27:16.480
 there are a lot of elements in this ordinance about building materials which

01:27:16.480 --> 01:27:22.640
 we also comply with but are is not as important at this point in time since

01:27:22.640 --> 01:27:27.320
 it's not enforceable so we really worked hard to comply with the other

01:27:27.320 --> 01:27:31.960
 architectural elements and specifically just to make sure that we're providing

01:27:31.960 --> 01:27:38.480
 relief architecturally across all sides of the facade and material changes and

01:27:38.480 --> 01:27:45.160
 color changes and both vertical and horizontal articulation and that is all

01:27:45.160 --> 01:27:50.020
 I have at this time I'm happy to answer questions and Rick is also available to

01:27:50.020 --> 01:27:57.760
 answer questions thank you thank you Amy I do not see any questions thank you

01:27:57.760 --> 01:28:03.640
 thank you very much Commissioner Cole thank you chair I make a motion to

01:28:03.640 --> 01:28:09.640
 approve Commissioner Anderson we've got a first and a second for approval any

01:28:09.640 --> 01:28:16.280
 discussion okay I'll just say it's nice to see this part of Razor Ranch getting

01:28:16.280 --> 01:28:26.440
 developed finally so let's vote on the board please that motion carries seven

01:28:26.440 --> 01:28:32.520
 zero that takes us to our public hearing item item for the evening it is for a Z

01:28:32.520 --> 01:28:40.320
 210017 I'll invite Lisa Payne up to the podium for presentation and I will open

01:28:40.320 --> 01:28:43.160
 the public hearing

01:28:43.160 --> 01:29:02.360
 all right good evening everyone again Lisa Payne and this property and this is

01:29:02.360 --> 01:29:08.360
 a rezoning request that's for 311.5 acres on a rural residential property

01:29:08.360 --> 01:29:13.400
 and they would like to become a light industrial LI district the future land

01:29:13.400 --> 01:29:18.040
 use designation for this is light industrial in the Denton 2040

01:29:18.040 --> 01:29:22.160
 comprehensive plan and it's generally located on the northeast corner of

01:29:22.160 --> 01:29:27.720
 Hampton and Mosh Branch Road the property is currently has four active

01:29:27.720 --> 01:29:31.920
 gas wells three of which are being plugged but other than that it's vacant

01:29:31.920 --> 01:29:38.600
 except for agricultural uses and to the zoning is surrounded by residential to

01:29:38.600 --> 01:29:43.800
 the northwest and south but on the northeast there's some LI and on the

01:29:43.800 --> 01:29:51.240
 east is geo the Denton development code has general approval criteria and zoning

01:29:51.240 --> 01:29:56.920
 criteria which is listed on the slide to summarize LI zoning is consistent with

01:29:56.920 --> 01:30:01.120
 the Denton 2040 comprehensive plan as a subject properties feature land use

01:30:01.120 --> 01:30:05.360
 designation is light industrial in addition all the surrounding property is

01:30:05.360 --> 01:30:08.840
 designated as light industrial except for the single-family neighborhood to

01:30:08.840 --> 01:30:13.800
 the south as shown on the future land use map the development shall comply with

01:30:13.800 --> 01:30:18.720
 DDC requirements when it develops such as landscape buffer site and building

01:30:18.720 --> 01:30:25.800
 designs and exterior lighting and the proposed rezoning from our to LI will

01:30:25.800 --> 01:30:29.760
 make this property consistent with the future land use map designation of light

01:30:29.760 --> 01:30:35.920
 industrial public notices were sent out in the newspaper it was April 10th

01:30:35.920 --> 01:30:42.160
 website April 7th and property signs are posted on April 15th notices were mailed

01:30:42.160 --> 01:30:48.040
 out to 22 of them were sent to those within 200 feet of the property and 26

01:30:48.040 --> 01:30:54.000
 were sent to those within 500 feet responses as for formal responses we got

01:30:54.000 --> 01:31:00.000
 three in opposition and one in favor and the applicant held two neighborhood

01:31:00.000 --> 01:31:07.040
 meetings on March 17th and April 13th staff recommends approval of the

01:31:07.040 --> 01:31:12.320
 requested rezoning as it does comply with the DDC and I'm available for

01:31:12.320 --> 01:31:19.560
 questions and the applicant is also here it has a presentation thank you Lisa any

01:31:19.560 --> 01:31:28.480
 questions at this time commissioner Anderson thank you sure can you go back

01:31:28.480 --> 01:31:33.360
 a slide for me I want to look at something real quick go to slide three

01:31:33.360 --> 01:31:47.400
 please this one three yes okay thank you okay okay any other questions for Lisa

01:31:47.400 --> 01:31:53.400
 at this time okay thanks Lisa did you say the applicant does have a

01:31:53.400 --> 01:31:58.160
 presentation yes I don't have a card from them but whoever would like to come

01:31:58.160 --> 01:32:03.180
 down I won't let you have the podium I will say also for the record that I did

01:32:03.180 --> 01:32:10.880
 not mention before is Commissioner Cole is recused himself from this item hi if

01:32:10.880 --> 01:32:14.280
 you'll just state your name and address you will have 10 minutes for your

01:32:14.280 --> 01:32:19.400
 presentation yes I'm Lee Ramsey with Orson Holdings 525 South Loop 288 here

01:32:19.400 --> 01:32:23.560
 in Denton and thank you guys for serving and spending time away from your

01:32:23.560 --> 01:32:27.800
 families tonight we are presenting the zoning case a lot of what we're going to

01:32:27.800 --> 01:32:31.600
 go over I'll move through quickly because Lisa already covered so I'll get

01:32:31.600 --> 01:32:36.920
 to the points that that matter so I'm Lee Ramsey and Brandon Martino is my

01:32:36.920 --> 01:32:40.720
 business partner we are based here in Denton our businesses are based here in

01:32:40.720 --> 01:32:46.040
 Denton we're actually from here so we do have done lots of development around

01:32:46.040 --> 01:32:51.040
 town as far as industrial and infield development so we've worked with the

01:32:51.040 --> 01:32:58.840
 city very very closely since 2006-7 on doing projects throughout the city so

01:32:58.840 --> 01:33:04.560
 we're very familiar with the city processes and and and applications a

01:33:04.560 --> 01:33:08.840
 little bit about us if you look at our developments from our infield to

01:33:08.840 --> 01:33:13.760
 industrial when industrial was needed in town we were one of the first ones to

01:33:13.760 --> 01:33:17.800
 step up and when there was not any anything available to build spec

01:33:17.800 --> 01:33:22.320
 buildings here in town the first ones on Western on the other side also

01:33:22.320 --> 01:33:27.240
 downtown when there was housing needed we were some of the first ones to enter

01:33:27.240 --> 01:33:32.080
 downtown and create housing for downtown so we've worked closely throughout

01:33:32.080 --> 01:33:36.960
 different aspects of the city from industrial and multifamily to retail and

01:33:36.960 --> 01:33:41.880
 infield to greenfield so we understand when it talks about integrity of about

01:33:41.880 --> 01:33:46.920
 which parts of the city need need what uses thinking about the community which

01:33:46.920 --> 01:33:49.880
 we'll talk a little bit about some of the steps we've taken here today and

01:33:49.880 --> 01:33:53.800
 thinking forward about you know what does our city need in the future for

01:33:53.800 --> 01:34:01.880
 jobs for for whatever uses that the city needs long term these are some local

01:34:01.880 --> 01:34:07.320
 charities that we support we are very involved in our community so this

01:34:07.320 --> 01:34:12.240
 throughout the years these are different things from the the editor to UNT to

01:34:12.240 --> 01:34:19.120
 current my partner and I both serve on the the Casa board so we've done that

01:34:19.120 --> 01:34:24.880
 for many years I won't belabor the site I think everybody's familiar where the

01:34:24.880 --> 01:34:29.760
 site is and what part of town but it did have an exhibit to show that we also had

01:34:29.760 --> 01:34:32.920
 two neighborhood meetings and at the neighborhood meetings we offered for any

01:34:32.920 --> 01:34:36.560
 residents to come meet with us one-on-one in our office and we did have

01:34:36.560 --> 01:34:42.320
 a few take us up on that which was which we enjoyed because it whether they agree

01:34:42.320 --> 01:34:46.080
 or disagree it gave us a chance to at least communicate at a higher level so

01:34:46.080 --> 01:34:51.020
 I was thankful we did have a few residents take us up on that this this

01:34:51.020 --> 01:34:56.440
 exhibit I think is important so as we looked at putting this LI zoning which

01:34:56.440 --> 01:35:01.440
 is which is in accordance with the comprehensive plan the 20 40 plan that

01:35:01.440 --> 01:35:07.300
 was just accepted and the 2030 plan that had business innovation that transitioned

01:35:07.300 --> 01:35:10.720
 to LI we thought to ourselves how do we protect this neighborhood because we

01:35:10.720 --> 01:35:14.720
 looked at is as if we did live in this neighborhood and and we know an LI

01:35:14.720 --> 01:35:20.000
 zoning is a industrial use and ranch estates and some of the other residents

01:35:20.000 --> 01:35:24.320
 have been there a while so that's why if you wonder how why we picked and what we

01:35:24.320 --> 01:35:30.080
 did there that we were trying to figure out how in long-term future that that

01:35:30.080 --> 01:35:33.680
 would protect a buffer forever and we came up with a few other ideas which

01:35:33.680 --> 01:35:38.920
 I'll get to in a minute but ultimately it's 34 acres as a as a buffer but part

01:35:38.920 --> 01:35:42.560
 of that six acres or so is going to end up being a city right away that we have

01:35:42.560 --> 01:35:47.440
 to dedicate for future right away and then about 27 and a half acres will

01:35:47.440 --> 01:35:54.300
 still be in 35 acres or 34 acres will be in our total but 27 of it will be

01:35:54.300 --> 01:36:00.840
 left after so this is a concept plan this is what the future mobility plan

01:36:00.840 --> 01:36:05.080
 shows if you notice on the bottom it shows a road connecting all the way to

01:36:05.080 --> 01:36:09.800
 Windsor Drive all the way back through the future Luke 288 so we do have to

01:36:09.800 --> 01:36:13.640
 dedicate that right away but what we tried to do we tried to say how do we

01:36:13.640 --> 01:36:18.520
 limit access so that the northwest roads through the neighborhood can never

01:36:18.520 --> 01:36:24.280
 connect so we had our original idea was to possibly provide a park land

01:36:24.280 --> 01:36:28.680
 dedication there and debt and build that park and dedicate it but you know we

01:36:28.680 --> 01:36:31.960
 have neighborhood meetings for a reason so as we met with the neighborhood there

01:36:31.960 --> 01:36:35.160
 were some things that they had concerns about which I'll get to those comments

01:36:35.160 --> 01:36:40.680
 in a minute as a park being there it would never allow any access through

01:36:40.680 --> 01:36:45.160
 that I'm just kind of staging our train of thought and why we would do that it

01:36:45.160 --> 01:36:50.320
 would control what could ever be built there nothing and it would never allow

01:36:50.320 --> 01:36:54.920
 any connectivity so and it'd be maintained by the city long term but as

01:36:54.920 --> 01:36:59.360
 we met with the city I agree with some of their concerns about those things

01:36:59.360 --> 01:37:04.080
 which I'll get to in a minute if you notice our access future Luke 288 will

01:37:04.080 --> 01:37:10.280
 be coming through on the north side I believe they're gonna start in 2026 with

01:37:10.280 --> 01:37:13.480
 their land acquisition or construction I don't remember the exact dates on that

01:37:13.480 --> 01:37:18.440
 but somewhere in that area and if you also notice we're going to connect to

01:37:18.440 --> 01:37:22.480
 our only connect point and connectivity is coming down Mosh Branch there's not

01:37:22.480 --> 01:37:33.760
 any connectivity into the neighborhood this is a concept plan that we just did

01:37:33.760 --> 01:37:37.880
 if if that right of way isn't constructed through there so leaving

01:37:37.880 --> 01:37:42.880
 Hampton Road just as it is now the ultimate connection is probably going to

01:37:42.880 --> 01:37:48.600
 be different at at where it comes off of Mosh Branch into the subdivision that's

01:37:48.600 --> 01:37:53.840
 probably going to end up at a little u-shape or an s-curve tying that in so

01:37:53.840 --> 01:37:56.280
 it's probably going to be a little different that's going to be through the

01:37:56.280 --> 01:38:00.520
 platting working through with engineering on how that connection

01:38:00.520 --> 01:38:04.640
 point is made so that may change up a little bit just on how that connection

01:38:04.640 --> 01:38:09.040
 point but it will not be along Hampton Road per our current plans this is a

01:38:09.040 --> 01:38:14.760
 cross-section to show the open space that whether it is just open space or

01:38:14.760 --> 01:38:19.360
 it's whether it's a park if you notice it comes across that's a current stand

01:38:19.360 --> 01:38:23.360
 of trees between the neighborhood and our development and then after the 200

01:38:23.360 --> 01:38:26.800
 feet which is actually closer to 300 feet once you have the right of way

01:38:26.800 --> 01:38:29.960
 dedication so you have the right of way dedication and then 200 feet open space

01:38:29.960 --> 01:38:34.800
 and then on the property side of that there's another 35 feet which is

01:38:34.800 --> 01:38:41.040
 required from RR to LI so that's another reason we left that RR so that

01:38:41.040 --> 01:38:45.660
 would buffer would be required and another reason a building facing the

01:38:45.660 --> 01:38:49.440
 public space or RR that it can't be a back of a building it's got to be a

01:38:49.440 --> 01:38:54.340
 front of a building so that was another reason we decided to leave that as an RR

01:38:54.340 --> 01:38:57.680
 zoning so if you notice here this just is a little bit of a cross-section to

01:38:57.680 --> 01:39:03.440
 show what that buffer could look like this is just an exhibit to show we are

01:39:03.440 --> 01:39:08.400
 going to close in three gas wells we're going to leave the one it's kind of hard

01:39:08.400 --> 01:39:12.560
 to read but the two to the far north and then the one to the southwest the the

01:39:12.560 --> 01:39:16.960
 one to the southeast will be staying an existing gas well and we're relocate

01:39:16.960 --> 01:39:21.200
 getting rid of all the flow lines and putting it in the one flow line going to

01:39:21.200 --> 01:39:27.480
 the toward the west to connect in the Targa's line this is a final section of

01:39:27.480 --> 01:39:33.240
 what will be required at the corner of 380 and Mosh Branch with the turn lanes

01:39:33.240 --> 01:39:38.520
 there Mosh Branch will be worked out throughout as we get in the platting and

01:39:38.520 --> 01:39:43.720
 there's a staging phase of the buildings it will be worked out to what parts of

01:39:43.720 --> 01:39:50.700
 that are improved but the goal is the goal is to be not build what would be

01:39:50.700 --> 01:39:57.200
 normally required of Hampton Road to be able to use those funds to Mosh Branch

01:39:57.200 --> 01:40:01.960
 so whatever improvements need to be on Mosh Branch we can we can allocate those

01:40:01.960 --> 01:40:06.240
 funds there's been preliminary meetings with the city engineering on that to be

01:40:06.240 --> 01:40:09.920
 able to decide how we allocate that to improve that instead because there's

01:40:09.920 --> 01:40:13.760
 really not a reason to improve Hampton Road today it doesn't benefit the

01:40:13.760 --> 01:40:17.440
 neighborhood it doesn't benefit the development so any of those dollars we

01:40:17.440 --> 01:40:22.480
 need to allocate over there and that's not been agreed on by the city that is

01:40:22.480 --> 01:40:26.640
 that'll be worked through during platting but it's our intention and the

01:40:26.640 --> 01:40:31.480
 meetings have been positive so far with the city on that but that still needs to

01:40:31.480 --> 01:40:35.080
 can continue to work through on the stages of that with what right-of-way

01:40:35.080 --> 01:40:39.680
 acquisitions are needed and other things there I didn't know if you guys had seen

01:40:39.680 --> 01:40:43.480
 this but this is the future plan for the total loop 288 I just thought I would

01:40:43.480 --> 01:40:48.440
 include it so for informational purposes so as we met they had our city meetings

01:40:48.440 --> 01:40:52.720
 there was lots of topics about we just listed a few of them here the park area

01:40:52.720 --> 01:40:59.000
 sorry the park area and as we talked through it I thought it was a really good

01:40:59.000 --> 01:41:02.440
 idea in the beginning but then I understood some of the city's concerns I

01:41:02.440 --> 01:41:07.160
 think it is the ultimate way to protect the neighborhood as far as the city

01:41:07.160 --> 01:41:11.120
 controlling that but as I visited with them I understood some concerns about

01:41:11.120 --> 01:41:16.800
 parking and homelessness and more traffic so we worked through that with

01:41:16.800 --> 01:41:21.960
 them and came up with some other options there is a neighbor within the community

01:41:21.960 --> 01:41:25.800
 that's willing to buy the parkland area and obviously we will come to an

01:41:25.800 --> 01:41:30.720
 agreement on that and as long as we put a 25 year deed restriction on that that

01:41:30.720 --> 01:41:34.080
 it can only be agriculture because I think the neighborhood likes the the

01:41:34.080 --> 01:41:38.600
 country feel and I believe that buffer leaving an act could could still help

01:41:38.600 --> 01:41:41.840
 with that and we're in agreement with that and one of the neighbors is in

01:41:41.840 --> 01:41:45.720
 agreement with that as a matter of fact I met with him this morning if that

01:41:45.720 --> 01:41:49.880
 doesn't work we'll happily hold that land and put a deed restriction on

01:41:49.880 --> 01:41:54.960
 ourself because you know we're okay to dedicate that as a park put a deed

01:41:54.960 --> 01:41:59.700
 restriction for 25 years or sell it with a deed restriction of 25 years so we're

01:41:59.700 --> 01:42:03.840
 really trying to communicate look guys we care about this buffer we understand

01:42:03.840 --> 01:42:07.640
 it's an industrial development but what can we do to protect the neighborhood as

01:42:07.640 --> 01:42:11.240
 long as we can and still make the neighborhood happy and make make the

01:42:11.240 --> 01:42:17.560
 city happy to be able to get our zoning done we talked about the park do I have

01:42:17.560 --> 01:42:24.760
 any more time could I have yeah just I'll move quickly just I just wanted to

01:42:24.760 --> 01:42:27.680
 list some neighborhood comments that we addressed and walked through which I

01:42:27.680 --> 01:42:31.280
 think are important so we talked about the park at night and homelessness and

01:42:31.280 --> 01:42:34.600
 some of those things so we gave some ordinances about what how the city can

01:42:34.600 --> 01:42:38.000
 control that it doesn't look like that's the way we're going to end up so I won't

01:42:38.000 --> 01:42:42.600
 waste our time too much on this talked about drainage that those things will be

01:42:42.600 --> 01:42:47.520
 engineered at the platting fencing we talked about you know what type of

01:42:47.520 --> 01:42:50.520
 fencing would be if there was a park how would we connect that we worked with

01:42:50.520 --> 01:42:53.760
 some neighbors that if there was a park we would provide an extra fence but

01:42:53.760 --> 01:42:57.960
 again that doesn't look like the consensus of the way we're going this is

01:42:57.960 --> 01:43:01.760
 just another exhibit showing the parkland dedication and what the what the

01:43:01.760 --> 01:43:06.820
 right-of-way would look like or if we just left it open space ultimately this

01:43:06.820 --> 01:43:11.480
 would be mosh branch and this road would just be dedicated so all this would still

01:43:11.480 --> 01:43:18.240
 be open space concerns along traffic along Hampton again I've kind of visited

01:43:18.240 --> 01:43:21.320
 about that we've had preliminary means we're trying to get as much traffic as

01:43:21.320 --> 01:43:25.240
 we can to mosh branch and to loop 280 are to lovers Lane in the future loop

01:43:25.240 --> 01:43:32.920
 288 as as its comes in there's some things about when when was the

01:43:32.920 --> 01:43:36.320
 neighborhood going to be informed about the roadway and that was part of the

01:43:36.320 --> 01:43:40.160
 2040 plan we just had some discussion around that in our neighborhood meetings

01:43:40.160 --> 01:43:47.560
 and the mobility plan we had some discussions with a few residents about

01:43:47.560 --> 01:43:50.680
 what are the ultimate concerns the some of the biggest concerns are obviously

01:43:50.680 --> 01:43:56.560
 traffic and I've discussed what we're doing that we've met with the

01:43:56.560 --> 01:43:59.080
 neighborhood and also said we will advocate which we've got a letter

01:43:59.080 --> 01:44:03.760
 prepared to send to the city to advocate to say okay can we get no truck signs on

01:44:03.760 --> 01:44:08.040
 380 like Lakeview has on east of town when you go by that there's no truck

01:44:08.040 --> 01:44:13.420
 signs going through Lake Lakeview can we get speed limit signs up leaving the RR

01:44:13.420 --> 01:44:20.660
 portion so it can't come through and I can go through these if I can have just

01:44:20.660 --> 01:44:24.040
 one more minute these are some comments that so there's some comments about

01:44:24.040 --> 01:44:28.000
 light pollution and that's another reason we left it RR because that makes

01:44:28.000 --> 01:44:31.960
 it will plot that lot separately so that makes the property line further away

01:44:31.960 --> 01:44:36.400
 from the residents and by city ordinance the foot candle at the property line so

01:44:36.400 --> 01:44:39.980
 if we plot that as a separate lot it pushes that foot candle further away

01:44:39.980 --> 01:44:44.600
 from the residents so something we tried to work through and quoted some exterior

01:44:44.600 --> 01:44:49.240
 lighting standards that says what we have to do at building permit noise

01:44:49.240 --> 01:44:55.280
 pollution again that's why we put the buffer in there this is just a quick

01:44:55.280 --> 01:45:00.800
 measurement to show how far we are away from residents and structures so here's

01:45:00.800 --> 01:45:04.840
 the resident on this side this is over a quarter mile on this side as you come

01:45:04.840 --> 01:45:09.560
 down to this road it's about with the right away and the buffers about 350

01:45:09.560 --> 01:45:14.480
 feet we showed it from here to here to the edge of the parking lot about 302

01:45:14.480 --> 01:45:19.880
 and then to the back of the first building I know I'm moving quickly and I've

01:45:19.880 --> 01:45:26.680
 got more but we'll stop there if there's any questions commissioner Smith thank

01:45:26.680 --> 01:45:32.480
 you chair mr. Rimsky go back two slides yes sir thank you just weird you're

01:45:32.480 --> 01:45:38.360
 moving fast I just wanted to look at real quick okay can you go back to the

01:45:38.360 --> 01:45:42.560
 slide that you had that had the gas wells on it

01:45:44.480 --> 01:45:58.960
 I must have missed it I'm sorry couple forward you said there's one that's not

01:45:58.960 --> 01:46:02.240
 gonna be covered to the southeast key point that out the mouse yeah this one

01:46:02.240 --> 01:46:07.520
 is gonna stay in further Lee it was a producing well still at a high level so

01:46:07.520 --> 01:46:11.720
 the oil and gas company wasn't willing to work with me on closing that one they

01:46:11.720 --> 01:46:15.480
 were willing to work with me on closing these three well can you go and show

01:46:15.480 --> 01:46:19.360
 that on the concept map again then where now that I saw that you're kind of

01:46:19.360 --> 01:46:22.840
 flying through it earlier so go to your concept map so it's gonna be right there

01:46:22.840 --> 01:46:27.120
 yeah so it's gonna actually be here so this is the buffer area that kind of

01:46:27.120 --> 01:46:31.320
 comes up through here whether it's you know left open as acreage and this is

01:46:31.320 --> 01:46:36.440
 where the car the pad site and the access will still come through here to

01:46:36.440 --> 01:46:41.800
 access that well okay understood on the deed restricted sure structure you said

01:46:41.800 --> 01:46:47.240
 that if the neighbor and you do not come to an agreement on the land and put a

01:46:47.240 --> 01:46:50.560
 deed restriction on that you said your alternative you kind of move through

01:46:50.560 --> 01:46:53.360
 that quickly so you said your alternative was gonna be you guys would

01:46:53.360 --> 01:46:56.880
 keep the land and put the deed restrict on yourself to keep it agricultural yes

01:46:56.880 --> 01:47:00.680
 five years we will we will do that now that the risk to the neighborhood is that

01:47:00.680 --> 01:47:04.760
 if for some crazy reason you know I kicked the bucket I'll have to go to my

01:47:04.760 --> 01:47:07.760
 trustees that will continue that deed restriction then they have to trust me

01:47:07.760 --> 01:47:13.840
 that I'll keep it at that point right and so again our offices here in town

01:47:13.840 --> 01:47:20.440
 and we do multiple developments in this town so we're gonna honor that and I

01:47:20.440 --> 01:47:25.160
 understand that that's my word saying here we're gonna honor it but the only

01:47:25.160 --> 01:47:29.800
 the first option I brought was to look at a park and because that would forever

01:47:29.800 --> 01:47:33.320
 lock it in but I understand the neighborhood like that why they

01:47:33.320 --> 01:47:36.040
 wouldn't want that right because of the things that could come with that so

01:47:36.040 --> 01:47:41.080
 that's why we came up with this option to do this and so whether Austin Baker

01:47:41.080 --> 01:47:45.440
 buys it and I'll hold the deed restriction or I keep it with my own

01:47:45.440 --> 01:47:50.120
 deed restriction for 25 years either way possible Lisa can ask you a quick

01:47:50.120 --> 01:47:58.520
 question two things one by not having Parkland dedication within there is

01:47:58.520 --> 01:48:01.640
 there an impact fee that they have to pay instead by not including that or is

01:48:01.640 --> 01:48:05.660
 that just something that with industrial developments there's no requirement for

01:48:05.660 --> 01:48:15.040
 any Parkland or fee at all so this is just completely separate and then play

01:48:15.040 --> 01:48:19.560
 it play a hypothetical game for me they put a deed restriction on it neighbor or

01:48:19.560 --> 01:48:22.720
 somebody else buys it and has there for 25 years 25 years from now that deed

01:48:22.720 --> 01:48:27.760
 restriction comes up what then it re it goes back to being free open land that's

01:48:27.760 --> 01:48:32.960
 designated as RR that can be rezoned for whatever use the the individual owner

01:48:32.960 --> 01:48:36.000
 can do with at that point in time whether it's in the zoning piece I mean

01:48:36.000 --> 01:48:40.560
 what's the what's kind of the hypothetical 25 years from now right it

01:48:40.560 --> 01:48:46.200
 could stay the same or zoning wise you know cities don't have authority to

01:48:46.200 --> 01:48:52.400
 control deed restrictions so you know maybe it gets rezoned but that deed

01:48:52.400 --> 01:48:57.000
 restriction would just still be in place where legally somebody can take care of

01:48:57.000 --> 01:49:00.960
 that outside of the city and go to a district court and keep that deed

01:49:00.960 --> 01:49:05.840
 restriction for the ag use in place so let's just pretend for easy number 20

01:49:05.840 --> 01:49:11.160
 2047 this this this key restriction gets lifted it's not our agricultural

01:49:11.160 --> 01:49:14.120
 somebody else comes forward and puts up a project they can rezone at that point

01:49:14.120 --> 01:49:19.360
 in time probably to whatever yes that makes sense for our future land use that

01:49:19.360 --> 01:49:23.560
 kind of thing okay all right got it if someone tries to sell that land but it

01:49:23.560 --> 01:49:28.220
 has that 25-year deed restriction let's say that as Mr. Ramsey mentioned earlier

01:49:28.220 --> 01:49:31.880
 he kicks the bucket his trustees take it over they don't they don't honor or look

01:49:31.880 --> 01:49:35.240
 at it they just they sell it to somebody else even though the dedistrictions out

01:49:35.240 --> 01:49:38.160
 there they ignore that piece they sell it to somebody else are you saying then

01:49:38.160 --> 01:49:40.660
 that the city doesn't have any jurisdiction or doesn't see those deed

01:49:40.660 --> 01:49:44.320
 restrictions so there's a possibility that zoning could happen there but

01:49:44.320 --> 01:49:47.360
 there's some conflict there walk me through what you said there a second ago

01:49:47.360 --> 01:49:52.080
 there is a little conflict between zoning and dedistrictions but the state

01:49:52.080 --> 01:49:56.280
 law is that you cannot enforce deed restrictions and zoning that's why he

01:49:56.280 --> 01:50:01.680
 said has deed restrictions and the rest of the city or the state has zoning so

01:50:01.680 --> 01:50:05.760
 it's up to usually the individuals or the neighborhood to make sure that the

01:50:05.760 --> 01:50:11.080
 deed restrictions are enforced okay so while this could come before PNZ and

01:50:11.080 --> 01:50:15.120
 council at any time for a zoning change approved and everything else and nobody

01:50:15.120 --> 01:50:18.080
 would know because the deed restriction has to be really enforced by either the

01:50:18.080 --> 01:50:22.760
 individual or the other people who know about the deed restriction yes our

01:50:22.760 --> 01:50:26.800
 audience would know okay all right just want to make it I want to make it clear

01:50:26.800 --> 01:50:33.520
 yes thank you other questions for the applicant and I just want to remind

01:50:33.520 --> 01:50:38.200
 everybody we're not really talking about that piece of land that's been cut out

01:50:38.200 --> 01:50:44.320
 of this zoning request yeah so keep that at a high level anything that we decide

01:50:44.320 --> 01:50:48.520
 tonight it has nothing to do with that land that is something that they still

01:50:48.520 --> 01:50:55.040
 need to figure out so couple questions that I have while we see if anyone else

01:50:55.040 --> 01:51:03.480
 has do you have a decision on that tract I mean do you have a plan for when

01:51:03.480 --> 01:51:07.520
 you're making that decision and what you're doing so what our intention is

01:51:07.520 --> 01:51:11.560
 is after if we were going to sign a contract with whoever is going to

01:51:11.560 --> 01:51:15.240
 purchase it we would do it now but it would be contingent upon once we get our

01:51:15.240 --> 01:51:18.160
 final plat approved and the only reason why that is is because we're gonna have

01:51:18.160 --> 01:51:22.160
 to put some water line and sewer line easements and drainage easements through

01:51:22.160 --> 01:51:26.280
 that tract and I would want to make sure all those were in place before that was

01:51:26.280 --> 01:51:31.520
 transacted so that the plan would be as of my meeting this morning to obviously

01:51:31.520 --> 01:51:34.680
 we want to leave it RR for the first level of protection would to be

01:51:34.680 --> 01:51:38.560
 transacted to Austin Baker for our meeting this morning he has interest in

01:51:38.560 --> 01:51:45.120
 that what is your time frame if you do get the zoning change approved what is

01:51:45.120 --> 01:51:49.180
 your time frame for the development that you gave us this concept plan so it

01:51:49.180 --> 01:51:52.880
 would be a phase development we have chosen Exeter to be the final developer

01:51:52.880 --> 01:51:57.480
 of the project and Exeter is actually the guys building the million one or a

01:51:57.480 --> 01:52:01.280
 million two square feet maybe right now in Western Boulevard and actually

01:52:01.280 --> 01:52:04.960
 building the other half of Western Boulevard through development agreement

01:52:04.960 --> 01:52:09.560
 and so the reason we picked those guys is because one well they also built the

01:52:09.560 --> 01:52:13.280
 600,000 foot spec the biggest building I ever built and didn't that Lowe's went

01:52:13.280 --> 01:52:18.000
 into I sold them the 104 acres they're developing on now so I have a

01:52:18.000 --> 01:52:21.080
 relationship with these guys and they've done everything they said they would do

01:52:21.080 --> 01:52:27.480
 with me and they are very a class a product very well funded so that's the

01:52:27.480 --> 01:52:31.080
 reason I've chosen this group we have lots of people interested in this

01:52:31.080 --> 01:52:37.360
 property after we purchased it but we chose them specifically we never put it

01:52:37.360 --> 01:52:41.000
 on the market we we've worked hand-in-hand with them because they are

01:52:41.000 --> 01:52:44.880
 responsible they understand the city processes they've done development

01:52:44.880 --> 01:52:49.520
 agreements with the city to build roads so there's a reason I handpicked those

01:52:49.520 --> 01:52:59.520
 guys to be the end developer yes so they will start platting immediately I'm sorry

01:52:59.520 --> 01:53:02.960
 I didn't get to your question start plotting immediately and then it will be

01:53:02.960 --> 01:53:07.080
 a phased project they would build building one or building two at the

01:53:07.080 --> 01:53:11.040
 beginning and then as they lease up they would continue the project so it'd be

01:53:11.040 --> 01:53:16.440
 started in the near future probably 12 months by the 8 to 12 months that helps

01:53:16.440 --> 01:53:22.800
 with the start so I'll ask you what I brought up at the work session which was

01:53:22.800 --> 01:53:25.600
 when you're talking about all the neighborhood protections that you want

01:53:25.600 --> 01:53:30.080
 to have in place and you mentioned that countless time in your presentation why

01:53:30.080 --> 01:53:35.600
 did you not go down a PD route with this request when we could actually could be

01:53:35.600 --> 01:53:41.200
 discussing all of those protections and actually have them codified with what we

01:53:41.200 --> 01:53:45.880
 would be voting on today because everything that you mentioned and

01:53:45.880 --> 01:53:50.360
 everything we're really talking about is just conceptual at this point there's

01:53:50.360 --> 01:53:56.360
 nothing that would tie anything to the zoning change if we approve it to Li and

01:53:56.360 --> 01:54:03.280
 ultimately City Council does but so question sure so most of what we needed

01:54:03.280 --> 01:54:09.520
 we was within the Li zoning and really the PD is for extenuating circumstances

01:54:09.520 --> 01:54:14.000
 like if a site has certain things that you can't meet the code or you're trying

01:54:14.000 --> 01:54:19.040
 to do more density and then give extra green space in this project we knew we

01:54:19.040 --> 01:54:21.960
 were given that much green space and then throughout the project with the

01:54:21.960 --> 01:54:26.480
 floodplain areas and that was gonna sit you can't count it as green space but

01:54:26.480 --> 01:54:31.560
 it's still open space so we really didn't see a reason for the city didn't

01:54:31.560 --> 01:54:34.760
 code that we needed to because most of our uses were in line we were meeting

01:54:34.760 --> 01:54:39.080
 our green space requirements we were giving more open space than what the

01:54:39.080 --> 01:54:43.280
 code allowed so we really didn't see and it's always supposed to be really used

01:54:43.280 --> 01:54:47.440
 for special circumstances and it would be hard for me to say yeah we need a PD

01:54:47.440 --> 01:54:52.060
 for these special circumstances and I don't have a lot of those things so

01:54:52.060 --> 01:54:55.680
 that's the reason we went with straight allies only well to me I think you do

01:54:55.680 --> 01:54:59.760
 have some special circumstances here you've got a as you know I mean how

01:54:59.760 --> 01:55:03.680
 special that community is and has been here and is well established you've got

01:55:03.680 --> 01:55:07.600
 special circumstances of roads being highly inadequate for the kinds of

01:55:07.600 --> 01:55:12.960
 trucks that you are going to be bringing into that site that we could you know

01:55:12.960 --> 01:55:18.000
 you talked about you know allocating money and only improving you know I mean

01:55:18.000 --> 01:55:23.680
 all of that the signs I mean all of that could have been done within a PD I mean

01:55:23.680 --> 01:55:27.620
 those are the special circumstances that I think do exist so well we can just

01:55:27.620 --> 01:55:31.680
 agree to disagree on that but thank you for answering the question any other

01:55:31.680 --> 01:55:38.400
 questions right now for the applicant okay thank you very much we may call

01:55:38.400 --> 01:55:45.280
 you up again thank you evening goes I do have some cards people wishing to speak

01:55:45.280 --> 01:55:51.000
 so a Rebecca height is the first one I have if you'll come to the podium and

01:55:51.000 --> 01:55:55.200
 set your name and address you will have your time will begin you'll have four

01:55:55.200 --> 01:55:57.440
 minutes

01:55:57.440 --> 01:56:05.560
 thank you for hearing me I appreciate it I'm Rebecca height I'm at 3800 Hampton

01:56:05.560 --> 01:56:12.560
 Road so we are on the corner where you see the corner on the what is that on

01:56:12.560 --> 01:56:16.360
 the west side or east side there the corner on the east side there's a house

01:56:16.360 --> 01:56:21.720
 there and then we're right beside that our property line is at that corner part

01:56:21.720 --> 01:56:27.680
 that meets so first of all of course we don't want the industrial park we don't

01:56:27.680 --> 01:56:34.520
 want to see that through our backyard we also had concerns about the traffic the

01:56:34.520 --> 01:56:38.040
 trucks that are driving through there we also have concerns about traffic

01:56:38.040 --> 01:56:42.600
 driving through our residential area currently it's a very safe locked-in

01:56:42.600 --> 01:56:48.480
 residential area where people walk and enjoy kids walk their dogs elderly walk

01:56:48.480 --> 01:56:53.960
 their dogs it's just a nice safe community so we do have concerns about

01:56:53.960 --> 01:56:58.080
 traffic and it has been discussed with signage and so forth so I'm not sure

01:56:58.080 --> 01:57:05.040
 where we'll end up with that but we would really not we would really prefer

01:57:05.040 --> 01:57:09.280
 it not to go to IL we really would if that's at all an option if we could keep

01:57:09.280 --> 01:57:14.000
 it residential we had actually spoken about having it being residential at one

01:57:14.000 --> 01:57:18.600
 point with an overlay for two acre lots or five acre five acre lots I don't

01:57:18.600 --> 01:57:22.200
 think that ever was approved but that was something that we had discussed at

01:57:22.200 --> 01:57:27.800
 one point in our community meetings we also understand that it is most of that

01:57:27.800 --> 01:57:32.160
 is industrial but we would really appreciate your consideration because

01:57:32.160 --> 01:57:37.000
 this is going right in our backyards and and some people they're going to be

01:57:37.000 --> 01:57:42.880
 looking at it directly straight on so thank you for your time

01:57:42.880 --> 01:57:57.480
 state your name and address and your time will begin hi hi I'm Anne Smith I

01:57:57.480 --> 01:58:05.360
 live at 2013 Cindy Lane and thank you for being here and taking your time we

01:58:05.360 --> 01:58:10.480
 appreciate your work that you do for the city of Denton Denton is characterized

01:58:10.480 --> 01:58:16.000
 by exceptional livability the diversity of choices available to all people in

01:58:16.000 --> 01:58:20.320
 employment lifestyle neighborhood settings and our North Texas values and

01:58:20.320 --> 01:58:26.120
 cultures to find what didn't is and what we have to offer we have four strategic

01:58:26.120 --> 01:58:32.280
 directions the character of Denton our people our institutions our government

01:58:32.280 --> 01:58:39.120
 the strength of our economy sound growth our form and function Denton is a city

01:58:39.120 --> 01:58:44.480
 built on character and the preservation of that character creating new

01:58:44.480 --> 01:58:49.320
 complementary development is central to the committee's goals as it moves

01:58:49.320 --> 01:58:54.960
 forward Denton is consciously green we are a leader in our commitment to

01:58:54.960 --> 01:59:01.500
 sustainability and we have a significant urban tree canopy we also have seven

01:59:01.500 --> 01:59:06.600
 hundred and fifty three thousand dollars 100 in the tree mitigation fund which we

01:59:06.600 --> 01:59:10.680
 do hope that that fund is used for replacement of trees when development

01:59:10.680 --> 01:59:16.520
 comes in and takes trees out the above statements were found in the Denton 2040

01:59:16.520 --> 01:59:22.120
 comprehensive plan when you find a bird's nest in a tree or you find a

01:59:22.120 --> 01:59:26.280
 little rabbit's nest under a bush and somebody wants to come and cut the tree

01:59:26.280 --> 01:59:31.800
 down or cut the bush down or move the bush or whatever somebody could justify

01:59:31.800 --> 01:59:36.920
 it by saying well the bird or the rabbit will find another place to live an

01:59:36.920 --> 01:59:44.920
 industrial complex or a multifamily rural or residential complex developer

01:59:44.920 --> 01:59:50.680
 can see land that they want they have a vision what is next to the land is

01:59:50.680 --> 01:59:55.440
 secondary in that vision just like the birds and the rabbits because the

01:59:55.440 --> 01:59:59.880
 developers have a desire to create something on the land they may not have

01:59:59.880 --> 02:00:06.560
 a desire to respect their soon-to-be neighbors ranch estates is not new we're

02:00:06.560 --> 02:00:13.200
 old our covenants were recorded with this Denton County in 1963 that was 59

02:00:13.200 --> 02:00:19.240
 years ago you are the gatekeepers you look at each organization that comes in

02:00:19.240 --> 02:00:24.880
 here and to Denton that wants to build something move something or replace

02:00:24.880 --> 02:00:30.680
 something it is you the board who does not wear a political color of red or

02:00:30.680 --> 02:00:36.400
 blue or does not see you with a biased eye it is the board who should have the

02:00:36.400 --> 02:00:42.120
 backs of each and every citizen of Denton the current organizational chart

02:00:42.120 --> 02:00:48.480
 updated October 27th 2021 says that the board commissioners and committees are

02:00:48.480 --> 02:00:55.080
 on the same line as a city auditor both are under the City Council and the City

02:00:55.080 --> 02:01:00.340
 Council is underneath the citizens of Denton we have a hundred and fifty one

02:01:00.340 --> 02:01:06.160
 thousand two hundred and nineteen souls in Denton we need strong leaders with

02:01:06.160 --> 02:01:12.560
 strong vision who will identify the quality of life for their citizens to

02:01:12.560 --> 02:01:17.760
 have a meaningful vision for all of us here if you're from Ranch Estates would

02:01:17.760 --> 02:01:24.800
 you hold up your hand please we have 60 households in Ranch Estates I was able

02:01:24.800 --> 02:01:34.880
 to contact 50 households of the 50 all 50 but one wants the if this zoning is

02:01:34.880 --> 02:01:42.480
 goes to light industrial and if that park strip the 34 acres is available to

02:01:42.480 --> 02:01:50.520
 be purchased and to stay our are that's what we wish everybody wanted the 50 49

02:01:50.520 --> 02:01:58.240
 wanted that option I do think that the city that Ranch Estates feels that we

02:01:58.240 --> 02:02:06.000
 would like the section of land to stay our are because it is beautiful rural

02:02:06.000 --> 02:02:16.440
 residential land thank you thank you Smith the next card I have is Julie

02:02:16.440 --> 02:02:27.540
 Kleinkopf you'll say your name and address your time will begin Julie

02:02:27.540 --> 02:02:32.400
 Kleinkopf and I'm from Ranch Estates too and I didn't prepare anything I just

02:02:32.400 --> 02:02:37.400
 wanted to show up and say that everyone in our neighborhood that I've spoken to

02:02:37.400 --> 02:02:43.400
 does not want it to turn to light residential until it absolutely has to

02:02:43.400 --> 02:02:47.480
 so according to the plan that would be 2040 for Denton's vision and if we could

02:02:47.480 --> 02:02:51.000
 come up with something else at that point that would be what I would vote

02:02:51.000 --> 02:02:57.320
 for and we just love all the green and I think and did a really good job of you

02:02:57.320 --> 02:03:03.800
 know explaining that some things just need to stay country and maybe large

02:03:03.800 --> 02:03:07.680
 lots or something else would be preferable for my husband and I so

02:03:07.680 --> 02:03:11.920
 that's all I wanted to say thank you

02:03:11.920 --> 02:03:19.520
 next card I have is Jim and Jim I am sorry I do not know how to say your last

02:03:19.520 --> 02:03:37.120
 name Poi raw if you'll say it for me I apologize the parole sounds like a cross

02:03:37.120 --> 02:03:44.920
 but I'd like to join those saying thank you for being on the planning and zoning

02:03:44.920 --> 02:03:52.960
 we understand how much time it takes to do your job Peggy and I have lived on

02:03:52.960 --> 02:04:02.460
 Hampton Road for 46 years we came a long time ago and it is a delightful

02:04:02.460 --> 02:04:09.440
 community if you come out and take a look there's chances are you'll see

02:04:09.440 --> 02:04:17.920
 people riding horses and they'll have donkeys and goats and whatever they love

02:04:17.920 --> 02:04:26.280
 animals and so when we heard of the change in zoning the first reaction was

02:04:26.280 --> 02:04:32.120
 how is that going to affect us and I'd like to compliment the developers

02:04:32.120 --> 02:04:38.720
 because as we read through what the developers were proposing it was clear

02:04:38.720 --> 02:04:47.960
 that they were looking at the residents and trying to do a job that would

02:04:47.960 --> 02:04:53.560
 satisfy us we know that that land sometime is going to be developed is

02:04:53.560 --> 02:05:00.480
 what going to be right in the middle of Denton before too long and so our

02:05:00.480 --> 02:05:08.240
 assumptions were it's going to change and then the other is how do we support a

02:05:08.240 --> 02:05:13.640
 change that's going to live leave our community alone and I I think the idea

02:05:13.640 --> 02:05:22.560
 of the park originally had all of us not excited but certainly pleased and now

02:05:22.560 --> 02:05:30.840
 that there's the possibility that a resident will buy that and keep it as

02:05:30.840 --> 02:05:38.580
 as ranch and I don't know if it was clear but this individual is going to

02:05:38.580 --> 02:05:44.560
 sign that he or his family would not sell that land for another change the

02:05:44.560 --> 02:05:51.920
 zoning in the land for 25 years and I don't imagine I'll be around to see if

02:05:51.920 --> 02:05:57.320
 what happens at the end of that 25 years but that was a significant commitment

02:05:57.320 --> 02:06:05.000
 that the buyer made so thank you for everything you're doing we support the

02:06:05.000 --> 02:06:11.520
 development and we thank you again

02:06:11.520 --> 02:06:18.520
 I don't have any other cards wishing to speak but this is a public hearing you

02:06:18.520 --> 02:06:29.960
 certainly can come down to the podium hello then thank you very much

02:06:29.960 --> 02:06:37.640
 I'm Gary Hellman live at 3900 Lariat Road and I guess really as this goes on

02:06:37.640 --> 02:06:41.920
 there's more and more questions as I heard you talking to the gentleman from

02:06:41.920 --> 02:06:48.640
 we're in about what needs to be planned as a visit with neighbors and I emailed

02:06:48.640 --> 02:06:53.000
 and and I don't know whether any of the copied people read it we got to talking

02:06:53.000 --> 02:06:57.880
 about employees there how many employees are going to be in this area and how

02:06:57.880 --> 02:07:01.400
 many personal vehicles because we've been talking about trucks trucks trucks

02:07:01.400 --> 02:07:05.280
 but how many personal vehicles will be going in and out of there that was one

02:07:05.280 --> 02:07:11.060
 of the questions and and I think they tried to answer when loop 288 would be

02:07:11.060 --> 02:07:17.120
 finished because that could really relieve a lot of pressure to the area so

02:07:17.120 --> 02:07:22.880
 as this goes on it seems more and more thoughts given to other things besides

02:07:22.880 --> 02:07:28.600
 trucks in the warehouse I saw some emails and I guess we're beginning to

02:07:28.600 --> 02:07:34.760
 accept the fact that of everything that could be put in there even if it was

02:07:34.760 --> 02:07:40.960
 houses us even close to the acreage that we have that the traffic is going to be

02:07:40.960 --> 02:07:48.720
 more and this is probably the lesser of all the evils that could go in there

02:07:48.720 --> 02:07:56.680
 because industrial would you know heavy industrial manufacturing that wouldn't

02:07:56.680 --> 02:08:04.880
 be a great thing my grandparents old home and in Taylor's got Samsung moving

02:08:04.880 --> 02:08:10.320
 in two miles from them that's it's just what could happen is going to happen

02:08:10.320 --> 02:08:16.800
 because it's property the Bakers have the right to do what they shall with it

02:08:16.800 --> 02:08:27.200
 but it just it just bothers me that the fact that there's still questions popping

02:08:27.200 --> 02:08:36.720
 up that seem to address things like the egress to the property still need to be

02:08:36.720 --> 02:08:42.200
 answered I'm not really for it but what can you

02:08:42.200 --> 02:08:49.920
 do the I have to agree with questions I think the P&Z has brought up that there

02:08:49.920 --> 02:08:58.560
 needs to be more questions answered thank you for your time is there anyone

02:08:58.560 --> 02:09:04.080
 else wishing to speak on this item did you already speak you did not yet okay

02:09:04.080 --> 02:09:14.600
 sure come on it please no you're fine thank you and my name is

02:09:14.600 --> 02:09:20.800
 Toby carconia I'm at four one one five Hampton Road which is the furthest West

02:09:20.800 --> 02:09:26.400
 house on one on Hampton so I will be three hundred and two feet away from the

02:09:26.400 --> 02:09:32.800
 back or the front of the first building for 20 years I've woken up and been able

02:09:32.800 --> 02:09:38.800
 to look at my specifically large window in my dining room and and to see the

02:09:38.800 --> 02:09:44.640
 trees and the cows and the donkeys that somebody mentioned and so I really don't

02:09:44.640 --> 02:09:50.800
 want that to end I don't want that to go away so I very much appreciate the fact

02:09:50.800 --> 02:09:56.280
 that the park was proposed and now the Baker's potentially taking over that to

02:09:56.280 --> 02:10:02.960
 preserve what I see every day I would just ask and I don't even know if this

02:10:02.960 --> 02:10:08.120
 is the right forum but I wanted it to be heard that something's gonna happen just

02:10:08.120 --> 02:10:13.080
 like the gentleman said we know it's gonna happen if we can protect as much

02:10:13.080 --> 02:10:19.840
 as what we deal with every day meaning we want to see the agriculture we don't

02:10:19.840 --> 02:10:26.480
 want excessive traffic on our road our kids play out there our horses walk on

02:10:26.480 --> 02:10:35.440
 the streets we ride our golf carts and if we could protect that that's that's

02:10:35.440 --> 02:10:39.720
 certainly the goal I was one of the ones that met with Lee and Lee thank you for

02:10:39.720 --> 02:10:45.280
 allowing that I had asked him if we could if we could potentially move

02:10:45.280 --> 02:10:51.160
 building one and then the subsequent buildings back even just a little bit so

02:10:51.160 --> 02:10:55.800
 I would like that to be considered it gets a little bit further away from us

02:10:55.800 --> 02:11:03.720
 maybe a higher wall before the property starts would even or a thicker wall would

02:11:03.720 --> 02:11:11.320
 would even be better the last thing I will ask for is and and Rancher States

02:11:11.320 --> 02:11:17.240
 has come up against this battle a lot with the traffic and what he just said

02:11:17.240 --> 02:11:23.480
 was you know if if this light industrial becomes leased warehouses with employees

02:11:23.480 --> 02:11:27.880
 just like it is on Western you're going to have you're gonna have employee

02:11:27.880 --> 02:11:32.520
 traffic and those employees will find that way through Rancher States there's

02:11:32.520 --> 02:11:35.440
 no doubt that's what happened when there's a wreck on 380 they come through

02:11:35.440 --> 02:11:38.200
 Rancher States we can always we can always tell when there's a wreck out

02:11:38.200 --> 02:11:44.840
 there so I would like to ask for some type of formal protection for the Ranch

02:11:44.840 --> 02:11:52.480
 of States entrances on on Marsh Branch and on Cindy and on Marshall to keep the

02:11:52.480 --> 02:11:57.880
 north the you know the outside public out and and protect our streets and the

02:11:57.880 --> 02:12:16.560
 safety of our streets thank you else wishing to speak hi thank you

02:12:16.560 --> 02:12:23.760
 hi thank you guys also for listening to all of us tonight appreciate your

02:12:23.760 --> 02:12:29.280
 service my name is Charles C. Wildman my husband Keith Wildman and we live at

02:12:29.280 --> 02:12:35.400
 3818 Lariat Road in Ranch of States and I would just like to say that you know I

02:12:35.400 --> 02:12:41.280
 agree with what's been spoken that I would prefer to see this day our are as

02:12:41.280 --> 02:12:48.920
 long as we can and then if that cannot you know to you know push back what's

02:12:48.920 --> 02:12:52.880
 been asked like the building one to give more of a buffer and what we have in

02:12:52.880 --> 02:12:59.040
 Ranch of States again has been there for a long time we enjoy just the space of

02:12:59.040 --> 02:13:05.440
 and the camaraderie in the neighborhood but also the space and having you know

02:13:05.440 --> 02:13:10.600
 the freedom to be outside move around not worry about the traffic and all of

02:13:10.600 --> 02:13:17.480
 that and but it just seems like having an industrial just right outside of us

02:13:17.480 --> 02:13:24.720
 is in great contrast to a neighborhood setting like that and just real quickly

02:13:24.720 --> 02:13:31.600
 of course I'm against it as well we are an established neighborhood I work from

02:13:31.600 --> 02:13:36.400
 home that's why I'm dressed like I am sorry about that but yeah you know I

02:13:36.400 --> 02:13:41.600
 work from home I see most of my neighbors pets come by my window every

02:13:41.600 --> 02:13:47.400
 day I look out I have two windows that I can look out one on to Lariat one on to

02:13:47.400 --> 02:13:53.240
 Cindy and so I can see traffic which is never there which is great because our

02:13:53.240 --> 02:13:59.040
 streets are not that good the city did come through and put another layer on

02:13:59.040 --> 02:14:03.600
 top of what was there but those are cracking and giving way so absolutely no

02:14:03.600 --> 02:14:08.400
 heavy trucks should be on our streets cutting through the neighborhood so I

02:14:08.400 --> 02:14:13.800
 think everyone else has spoken to the points I would have brought up we love

02:14:13.800 --> 02:14:19.920
 it we've been there for about what 15 years we bought it to raise our children

02:14:19.920 --> 02:14:24.680
 which we've done and just to be able to enjoy it in retirement so I'm really

02:14:24.680 --> 02:14:33.720
 hoping that we can keep it the way it is thank you anyone else wishing to speak

02:14:41.120 --> 02:14:47.040
 hello my name is Jessica far I'm one of the owners of 1990 North Lariat Drive

02:14:47.040 --> 02:14:51.000
 I'm not gonna be saying anything really different than everybody else is saying

02:14:51.000 --> 02:14:54.800
 here but this is an important issue and I wanted as many people to speak on as

02:14:54.800 --> 02:15:00.100
 possible but you know I second a lot of what a lot of the people up here have

02:15:00.100 --> 02:15:04.760
 said tonight I think if everybody could keep it the same we all would we like

02:15:04.760 --> 02:15:08.680
 kind of the way the neighborhood is as it stands but I did want to recognize

02:15:08.680 --> 02:15:12.200
 the work that the developers have done here they've really tried to hear all of

02:15:12.200 --> 02:15:17.760
 us and recognize you know our points of view I second that I think Austin Baker

02:15:17.760 --> 02:15:21.920
 should buy the tract protecting the neighborhood from any kind of bill that

02:15:21.920 --> 02:15:27.600
 goes there as far as light industrial is concerned what I love it if it wasn't

02:15:27.600 --> 02:15:31.880
 absolutely but I would absolutely prefer light industrial to multifamily homes

02:15:31.880 --> 02:15:36.400
 and kind of local people kind of living in that space so I support the plan as

02:15:36.400 --> 02:15:40.040
 is but do you think that there should be protections in place as far as heavy

02:15:40.040 --> 02:15:45.480
 trucks and as much as those buildings could be covered or the developers could

02:15:45.480 --> 02:15:48.600
 work with us to kind of conceal and make sure that you know the neighborhood sees

02:15:48.600 --> 02:15:53.200
 you know as beautiful of a spot as they could I hope that that's what we see in

02:15:53.200 --> 02:15:57.840
 the future but I do support this so thank you thank you

02:15:57.840 --> 02:16:01.920
 anyone else wishing to speak

02:16:06.440 --> 02:16:09.440
 thank you

02:16:09.440 --> 02:16:15.400
 I'm Julie's roll on I live on 1912 lariat with my husband and three boys

02:16:15.400 --> 02:16:19.720
 we're newer to the neighborhood but we move there specifically because my

02:16:19.720 --> 02:16:25.960
 husband's prior military PTSD the works we wanted somewhere that he would feel

02:16:25.960 --> 02:16:29.440
 at peace we saw that house fell in love with the house fell in love with the

02:16:29.440 --> 02:16:34.440
 neighborhood and to have this there is going to ruin that quite a bit

02:16:34.440 --> 02:16:39.200
 especially having all that traffic coming through I'm against it if that

02:16:39.200 --> 02:16:43.240
 building one could at least be put back more trees anything to preserve the

02:16:43.240 --> 02:16:49.320
 greenery and the piece that we currently have I would prefer that I don't think

02:16:49.320 --> 02:16:52.440
 you're gonna find property like that anywhere in Denton we've looked and

02:16:52.440 --> 02:16:56.440
 looked and looked and this one kind of God placed it in our path and it worked

02:16:56.440 --> 02:17:02.200
 out and I'm with everybody else in the community we oppose it it's probably

02:17:02.200 --> 02:17:05.240
 gonna happen but at least push that building back and put some trees and try

02:17:05.240 --> 02:17:10.920
 to preserve it just a little bit would be great thank you thank you

02:17:10.920 --> 02:17:20.240
 anyone else wishing to speak I do have two people who did fill out cards not

02:17:20.240 --> 02:17:30.720
 wishing to speak but both in opposition that we will put into the record anyone

02:17:30.720 --> 02:17:36.840
 else wishing to speak okay seeing none and I don't have anyone on the phone I'm

02:17:36.840 --> 02:17:41.880
 gonna go ahead and close the public hearing and open the floor for a motion

02:17:41.880 --> 02:17:49.720
 or discussion commissioner Anderson thank you chair mr. Ramsey can I ask a

02:17:49.720 --> 02:17:53.640
 question I mean you might come back down for a second

02:17:57.280 --> 02:18:02.640
 hearing all the people speak I mean you get the hint that there's mostly

02:18:02.640 --> 02:18:06.920
 opposition against this but they are willing to compromise it sounds like a

02:18:06.920 --> 02:18:11.920
 little bit if but would you guys be willing to move buildings back a little

02:18:11.920 --> 02:18:16.400
 bit to add more green more trees there to help protect the environment that

02:18:16.400 --> 02:18:19.920
 they currently have that they do see is that something that y'all would be

02:18:19.920 --> 02:18:23.560
 willing to entertain yeah we would have there we feel like we've done that

02:18:23.560 --> 02:18:28.360
 because if you look at what we're ever we're giving up 14.4 percent of our

02:18:28.360 --> 02:18:33.560
 entire site already and then on the backs because if you total up all the

02:18:33.560 --> 02:18:40.040
 land that we're either dedicating to selling to open space or which or

02:18:40.040 --> 02:18:45.160
 dedicating the park whatever whatever happens there it's about 14.4 percent of

02:18:45.160 --> 02:18:51.560
 our site so you know are we talking in 10 feet 50 feet you know we also have a

02:18:51.560 --> 02:18:57.440
 landscape berm of 35 feet on the inside of our property after the park or after

02:18:57.440 --> 02:19:03.800
 the open space it's got a berm and a and a fence let me see here if I can find

02:19:03.800 --> 02:19:09.480
 that right there so if you notice notice on that the the open space would end

02:19:09.480 --> 02:19:14.280
 here it would have a berm and then a masonry wall and on top of that berm

02:19:14.280 --> 02:19:18.320
 that's approximately three feet tall it's going to have a landscaping and a

02:19:18.320 --> 02:19:22.900
 buffer big and that's again that's one reason we left this is rr because it

02:19:22.900 --> 02:19:28.480
 would force a buffer between rr and the Li so we feel like we've really tried

02:19:28.480 --> 02:19:33.680
 that but I mean you know every you know every square foot we give up to that

02:19:33.680 --> 02:19:36.680
 development we feel like we've tried very hard to do what I mean what is that

02:19:36.680 --> 02:19:40.840
 are we talking 100 feet 200 feet 10 feet you know I don't I don't really know

02:19:40.840 --> 02:19:44.000
 what that looks like I think showing the slide again may help a little bit

02:19:44.000 --> 02:19:46.160
 because you know going through it a minute ago it's kind of you know we're

02:19:46.160 --> 02:19:49.960
 running out of time you're speaking a little bit but also if you put the road

02:19:49.960 --> 02:19:54.520
 there to widen Hampton right that's because on one of the sides isn't that

02:19:54.520 --> 02:19:59.480
 where you're gonna put the road part of this right there on the side of the

02:19:59.480 --> 02:20:03.040
 south side of the building one on the south side of building what there you

02:20:03.040 --> 02:20:06.280
 have next slide that one right there that's going to take up some of the

02:20:06.280 --> 02:20:10.240
 greenery right that if you know that road that's the southern road so that

02:20:10.240 --> 02:20:14.920
 park actually stopped so what we did we tried to run it as we passed this house

02:20:14.920 --> 02:20:20.320
 if you notice right here all to the edge of this gas well pad we tried to bring

02:20:20.320 --> 02:20:24.580
 that buffer as far as we could down this way this is probably more like what the

02:20:24.580 --> 02:20:29.800
 entrance is going to end up looking like going in without these sections here and

02:20:29.800 --> 02:20:36.440
 then tying back in to moss branch here but so this won't be here this will

02:20:36.440 --> 02:20:40.920
 actually be open space this is kind of dead spot to our development so what

02:20:40.920 --> 02:20:44.520
 we're talking about you know we're giving up this land but then also this

02:20:44.520 --> 02:20:48.400
 is not going to be developed either it's just not dedicated because it's kind of

02:20:48.400 --> 02:20:52.920
 a dead spot so that's actually going to end up being a buffer because we've got

02:20:52.920 --> 02:20:58.120
 to give this piece to the city for right away so I didn't even allocate that in

02:20:58.120 --> 02:21:03.160
 my buffer numbers because it's just kind of dead right it's not really big enough

02:21:03.160 --> 02:21:09.000
 to put any buildings on because once that road comes through so it's still

02:21:09.000 --> 02:21:12.920
 going to be zoned but in all reality it's going to be hard to build to build

02:21:12.920 --> 02:21:18.020
 something there okay and my last question I think is you think mr.

02:21:18.020 --> 02:21:22.360
 Baker is open to purchasing that property back to keep it that way yeah

02:21:22.360 --> 02:21:26.960
 I met with him this morning actually and you know I explained to him about the

02:21:26.960 --> 02:21:30.560
 easements that needed to be on it and we would go ahead and get a contract in

02:21:30.560 --> 02:21:34.480
 place now but it wouldn't close until the plat was approved just to make sure

02:21:34.480 --> 02:21:38.800
 that we had all the easements that we need for the platting piece of it and

02:21:38.800 --> 02:21:43.840
 yeah we he was agreeable this morning exactly because I think that's another

02:21:43.840 --> 02:21:47.520
 concern of theirs is eventually after that's over somebody comes in buys it

02:21:47.520 --> 02:21:51.440
 tries to develop something else on it okay I appreciate it thank you very much

02:21:51.440 --> 02:21:55.120
 thank you and Commissioner Anderson I just want to remind you I mean what

02:21:55.120 --> 02:22:01.800
 we're voting on today is simply zoning this parcel not that little corner but

02:22:01.800 --> 02:22:07.920
 to ally which opens to anything that that that allows and it has nothing to

02:22:07.920 --> 02:22:11.780
 do with this concept plan there's nothing that that he could promise

02:22:11.780 --> 02:22:15.920
 everything to you and in your question right there it does not gonna I mean

02:22:15.920 --> 02:22:19.400
 there's there's no teeth in that so that's not at all what we're voting on

02:22:19.400 --> 02:22:24.120
 the cut it's just a concept plan it's what they want to do if given the zoning

02:22:24.120 --> 02:22:28.160
 change but there's nothing that we're doing tonight that has anything to do

02:22:28.160 --> 02:22:34.640
 with moving around the concept plan that what we're voting on tonight so just

02:22:34.640 --> 02:22:40.960
 wanted to clarify that with you Commissioner Smith thank you chair I like

02:22:40.960 --> 02:22:47.140
 the project I think the projects good the I think it makes sense for that that

02:22:47.140 --> 02:22:53.400
 area just with the expansion of 288 coming in at some point but I did have a

02:22:53.400 --> 02:22:58.360
 couple questions Lisa on specifically going back to the PD and I was asking

02:22:58.360 --> 02:23:02.160
 questions after the applicants have a presentation primarily about those deed

02:23:02.160 --> 02:23:05.640
 restrictions because the way I understand it legally from my experiences

02:23:05.640 --> 02:23:08.720
 that those deed restrictions and when it comes to zoning as you expressed

02:23:08.720 --> 02:23:14.400
 publicly they're pretty flimsy and so walk me through the differences if this

02:23:14.400 --> 02:23:21.200
 was a PD instead of being an ally zoning case with a possible buyer deed

02:23:21.200 --> 02:23:25.600
 restriction so on and so forth all things that this governing body council

02:23:25.600 --> 02:23:30.960
 have no impact on whatsoever we do have impacts control PD and going forward in

02:23:30.960 --> 02:23:35.360
 the future I think within my understanding that the PD could protect

02:23:35.360 --> 02:23:39.280
 some of those things and that let that be governed and seen from our level the

02:23:39.280 --> 02:23:44.960
 local level so walk me through that okay so since this is a straight zoning case

02:23:44.960 --> 02:23:51.360
 and it does not include that piece of property that could be the AG slash Park

02:23:51.360 --> 02:23:58.600
 sounds like AG property we've had that same boundaries and the straight

02:23:58.600 --> 02:24:01.160
 zoning it meets that that's why they went with it and did not know with the

02:24:01.160 --> 02:24:04.960
 PD because there's nothing to deviate from because they can meet the code with

02:24:04.960 --> 02:24:11.280
 that it with the if they included that lower piece that's that AG area then

02:24:11.280 --> 02:24:16.560
 they can include that in a PD and make it where you all can require that that

02:24:16.560 --> 02:24:22.600
 is a park AG whatever you want it to be and that's documented and it has to be

02:24:22.600 --> 02:24:27.280
 like that until somebody if anybody ever comes back to amend the PD they'd have

02:24:27.280 --> 02:24:32.360
 to come back before you so pushing back a building has some of them have

02:24:32.360 --> 02:24:36.520
 requested you could do that in a PD and say yes this building has to be pushed

02:24:36.520 --> 02:24:41.160
 back this many more feet as part of straight zoning because yes this concept

02:24:41.160 --> 02:24:45.240
 plan is just a concept it's not an actual plan then that was a second part of my

02:24:45.240 --> 02:24:48.280
 conversation on that was gonna be about the site plan that comes along with the

02:24:48.280 --> 02:24:51.920
 PD but let me ask you one question you can finish your statement so on the

02:24:51.920 --> 02:24:56.760
 let's say goes through it we were to table this see if applicants willing to

02:24:56.760 --> 02:25:00.840
 even look at a PD whatever I'm making hypotheticals here but on the on the PD

02:25:00.840 --> 02:25:04.440
 side of things if in the future they ever wanted to sell off that land it's

02:25:04.440 --> 02:25:07.480
 parceled out and the plan development that this is rural has to use for

02:25:07.480 --> 02:25:10.480
 agricultural use all things the neighborhood wants the items that the

02:25:10.480 --> 02:25:15.560
 that the applicants are amenable to they want to sell off that land it would

02:25:15.560 --> 02:25:18.520
 still take or that someone wants to develop that piece of land it come back

02:25:18.520 --> 02:25:22.880
 you don't take a PD amendment to do that correct if you're talking about that AG

02:25:22.880 --> 02:25:27.800
 piece of property with that that's not part of the actual zoning request and

02:25:27.800 --> 02:25:33.080
 so it's going to stay RR regardless of what happens tonight and so that can be

02:25:33.080 --> 02:25:37.440
 bought and sold of course if somebody ever wanted to rezone it if they wanted

02:25:37.440 --> 02:25:41.320
 to request that they would have to come before this board as well as council as

02:25:41.320 --> 02:25:48.680
 it stands RR only allows AG uses and homesteads and any kind of uses that go

02:25:48.680 --> 02:25:53.300
 along with farming and ranching I'm asking I'm asking from the standpoint of

02:25:53.300 --> 02:25:58.400
 if it was included in a zoning request that AG strip land was including in a

02:25:58.400 --> 02:26:02.720
 zoning request but in that in that PD zoning request it was designated as being

02:26:02.720 --> 02:26:06.080
 agriculture later on the property owner wants to do something with that

02:26:06.080 --> 02:26:09.600
 agricultural land they've defined within there it would take a PD amendment

02:26:09.600 --> 02:26:13.200
 yes if it was included in the PD then yes you would have to come back and amend

02:26:13.200 --> 02:26:17.880
 the PD if they sold it off and then somebody else wanted to do that they'd

02:26:17.880 --> 02:26:20.560
 have to come back and do the PD amendment there as well same thing right

02:26:20.560 --> 02:26:25.080
 PD runs with the land not the owner on the site plan of course the doing the

02:26:25.080 --> 02:26:28.000
 site plan would allow for the codification of something like this

02:26:28.000 --> 02:26:32.960
 concept plan whereas as chair Ellis has mentioned that this concept plan is just

02:26:32.960 --> 02:26:37.840
 that it's conceptual that it's what is intended the setbacks and the things

02:26:37.840 --> 02:26:42.960
 that trust the developer and the applicant are truthful honest people you

02:26:42.960 --> 02:26:46.040
 know good small business owners here in Denton will honor those things you're

02:26:46.040 --> 02:26:49.880
 saying but there technically is nothing that holds them that holds them to this

02:26:49.880 --> 02:26:54.160
 after the zoning goes through is that correct as well to this exact plan but

02:26:54.160 --> 02:26:57.960
 they do still have to meet everything in the PD as far as the uses and design

02:26:57.960 --> 02:27:05.520
 details they're 35 foot it's actually 30 foot between plus the right of way

02:27:05.520 --> 02:27:11.240
 there at Hamilton yes so it'd be another call it call it 45 feet yes including

02:27:11.240 --> 02:27:23.640
 the right away there got it understood mr. Ramsey can I ask you a question I

02:27:23.640 --> 02:27:28.640
 think the intent of the strip of land makes a lot of sense and I appreciate

02:27:28.640 --> 02:27:31.560
 you guys finding a buyer and having some good things there I think my only

02:27:31.560 --> 02:27:36.720
 concern is just that it's not there's not a formal agreement to it and I know

02:27:36.720 --> 02:27:40.360
 that you got backup plans it doesn't provide a lot of protections but that's

02:27:40.360 --> 02:27:45.440
 not really my question I was gonna ask you down here the how inhibitive would

02:27:45.440 --> 02:27:49.440
 it be for you as an applicant to coming back with a site plan if this was to

02:27:49.440 --> 02:27:55.000
 come back as a plant as a PD well you know I think I don't know that we're a

02:27:55.000 --> 02:27:58.960
 hundred percent against it but our time is gonna start over basically again so

02:27:58.960 --> 02:28:01.600
 we're probably you know we've been working on this thing with neighborhood

02:28:01.600 --> 02:28:06.160
 meetings for months and so it's gonna add another you know months to our

02:28:06.160 --> 02:28:12.000
 project so I mean if that's my only option I mean I think we look at that

02:28:12.000 --> 02:28:15.920
 there is an option we could possibly do and Tina we thought about while setting

02:28:15.920 --> 02:28:24.800
 up there was on the plat could we dedicate a no build easement yes and one

02:28:24.800 --> 02:28:27.560
 of the thoughts I had was Commissioner Smith when you were going through your

02:28:27.560 --> 02:28:31.520
 line of questioning with Lisa is that if this southern portion of property was

02:28:31.520 --> 02:28:36.240
 included as part of the a plan development district request we would

02:28:36.240 --> 02:28:40.040
 want to establish some requirements within the plan development district to

02:28:40.040 --> 02:28:44.000
 ensure that it remains open space but then we would could reaffirm that also

02:28:44.000 --> 02:28:51.040
 on a plat and have it designated as a no build easement so therefore if that

02:28:51.040 --> 02:28:56.440
 easement is ever removed it has to come back through this city but we in order

02:28:56.440 --> 02:29:00.440
 to make that easement more enforceable we would need to have provisions within

02:29:00.440 --> 02:29:05.720
 the zoning for us to be able to enforce it because otherwise if I don't have

02:29:05.720 --> 02:29:09.160
 anything to hold the property owner accountable for providing that easement

02:29:09.160 --> 02:29:14.680
 they could submit a plat and request to be removed so I'm sorry no I was I say

02:29:14.680 --> 02:29:20.720
 excuse me so you know if if the if the applicant and the Commission are

02:29:20.720 --> 02:29:24.960
 interested in trying to establish some sort of plan development district while

02:29:24.960 --> 02:29:29.800
 the while the Denton Development Code says that if a development can be

02:29:29.800 --> 02:29:33.640
 accomplished under straight zoning it should be pursued in that manner given

02:29:33.640 --> 02:29:37.240
 some of these unique constraints or circumstances surrounding this property

02:29:37.240 --> 02:29:41.840
 with the residential adjacency you know we could explore the concept of a plan

02:29:41.840 --> 02:29:45.800
 development district further with the applicant if there was interest in how

02:29:45.800 --> 02:29:51.080
 better to restrict the development of the property on the south side if

02:29:51.080 --> 02:29:56.120
 there's interest in establishing some sort of minimum setback so with respect

02:29:56.120 --> 02:30:00.440
 to building number one that is amenable for the developer and that the

02:30:00.440 --> 02:30:05.280
 Commission is comfortable with and ultimately City Council and then also

02:30:05.280 --> 02:30:10.220
 addressing the plan that's being attached you know if there's concern that

02:30:10.220 --> 02:30:15.400
 the plan could evolve then what's shown here I mean technically that plan could

02:30:15.400 --> 02:30:19.360
 be attached to the plan development district coordinates and then it would

02:30:19.360 --> 02:30:24.160
 require an amendment to the plan development district if that plan ever

02:30:24.160 --> 02:30:28.480
 wanted to be modified we would probably put language I would recommend that we

02:30:28.480 --> 02:30:31.680
 would include language though within the plan development district that provides

02:30:31.680 --> 02:30:35.120
 some level of flexibility because we realize issues come up in the

02:30:35.120 --> 02:30:38.960
 development of engineering plans but you know if that's the direction the

02:30:38.960 --> 02:30:44.280
 Commission is heading down and if the applicant is amenable happy to work

02:30:44.280 --> 02:30:48.880
 through those items I would request that the Commission consider tabling this

02:30:48.880 --> 02:30:52.040
 request we would likely have to re-notice this application if we're

02:30:52.040 --> 02:30:55.440
 going to expand the area of consideration it does cause additional

02:30:55.440 --> 02:30:59.920
 delay though to the applicant sure so two things in your point or your

02:30:59.920 --> 02:31:06.280
 question Tina or the things you brought up one the I totally understand if it

02:31:06.280 --> 02:31:09.880
 seemed it can seem like from the very surface level of this is a straight

02:31:09.880 --> 02:31:15.360
 zoning case the fact that we're giving we're giving up land extra land you

02:31:15.360 --> 02:31:21.120
 know as a buffer that's not required per the zoning to me screams it's not a

02:31:21.120 --> 02:31:29.000
 straight zoning case in that scenario and so we're looking at a boundary piece

02:31:29.000 --> 02:31:35.040
 of land I understand yeah I understand I understand the can you go into the the

02:31:35.040 --> 02:31:40.640
 no-build easement a little bit more Tina right so a no-build easement typically

02:31:40.640 --> 02:31:44.760
 when established on the plat restricts any buildings from being developed

02:31:44.760 --> 02:31:49.800
 within that area so it's it essentially prohibits any construction of any

02:31:49.800 --> 02:31:53.920
 structures in that area and then it gets that that goes through that wouldn't be

02:31:53.920 --> 02:31:56.560
 it's that wouldn't be at this step of zoning they would be at the step of

02:31:56.560 --> 02:32:00.200
 plotting correct I just want to make sure we could possibly make it a

02:32:00.200 --> 02:32:04.760
 requirement of zoning that that becomes a no no-build easement on plaque correct

02:32:04.760 --> 02:32:09.000
 when that condition gets attached to a straight zoning request it essentially

02:32:09.000 --> 02:32:14.120
 makes it a plan development district request so so in order for us to be able

02:32:14.120 --> 02:32:18.540
 to enforce that no-build easement we would need to establish it through the

02:32:18.540 --> 02:32:23.600
 zoning process but ultimately it's it's also put on the plat to acknowledge that

02:32:23.600 --> 02:32:27.640
 that exists but the zoning is where the greater enforcement is from the city's

02:32:27.640 --> 02:32:32.920
 perspective to ensure that there's no construction or no development happening

02:32:32.920 --> 02:32:37.520
 within that that that no-build zone so what you're saying to make sure I

02:32:37.520 --> 02:32:40.680
 understand you is that the no-build easement could be a possible to it but

02:32:40.680 --> 02:32:43.680
 attaching at this point in time would kick it into PD which would basically

02:32:43.680 --> 02:32:46.320
 mean that we don't need to re-notice is that what you're saying is that gonna go

02:32:46.320 --> 02:32:49.960
 that is correct okay guys make sure that's all questions I have I guess a

02:32:49.960 --> 02:32:54.200
 question that I would just have is what kind of concerns and things would we

02:32:54.200 --> 02:32:58.720
 want to see in a PD from from this council I mean we've heard a setback you

02:32:58.720 --> 02:33:02.560
 know allowance because if we say okay these buildings of these sizes need to

02:33:02.560 --> 02:33:06.840
 go here that really limits when we're leasing or building these buildings of

02:33:06.840 --> 02:33:10.520
 what tenants we get in out we haven't had any discussion about jobs to our

02:33:10.520 --> 02:33:14.360
 city about the economic impact to our city and those are things that we really

02:33:14.360 --> 02:33:18.320
 need to consider so if we go in and lock this thing down on a PD and say your

02:33:18.320 --> 02:33:21.920
 buildings can only be this size or that I mean you guys have an also

02:33:21.920 --> 02:33:26.680
 responsibility to the business community of here too to say look we're trying to

02:33:26.680 --> 02:33:31.480
 be to work with give buffers but these are our also jobs and it's part of the

02:33:31.480 --> 02:33:35.620
 2040 plan and we're lining up with everything that you guys just voted on

02:33:35.620 --> 02:33:41.240
 yeah we're gonna go on that we've got a couple other commissioners who are

02:33:41.240 --> 02:33:48.640
 wishing to speak so we're gonna we're gonna somebody else has questions we

02:33:48.640 --> 02:33:53.320
 hang on Commissioner Villarreal just have a quick clarifying question for

02:33:53.320 --> 02:33:59.800
 Lisa I know you mentioned briefly during the work session that GEO was considered

02:33:59.800 --> 02:34:04.560
 is that correct it was considered earlier today as a possibility but the

02:34:04.560 --> 02:34:09.800
 applicant his developer won't they have they need something that is at least

02:34:09.800 --> 02:34:15.360
 done industrial in order to move forward but another developer might use that sure

02:34:15.360 --> 02:34:22.560
 is there a reason for that yeah so actually I went through since we talked

02:34:22.560 --> 02:34:25.880
 about that and went through each line item of what was approved in GEO and

02:34:25.880 --> 02:34:30.800
 what was improved in Li and there is not a ton of difference there's actually

02:34:30.800 --> 02:34:35.440
 some things that I think would be less attractive to the neighborhood in a GEO

02:34:35.440 --> 02:34:38.400
 zoning because they're really similar but I think there's a little more

02:34:38.400 --> 02:34:43.400
 landscaping required which we're gonna have anyway but I think there are some

02:34:43.400 --> 02:34:47.600
 things in that GEO that would be worse for the neighborhood than be better

02:34:47.600 --> 02:34:50.880
 once I really went through them because between our work session I actually went

02:34:50.880 --> 02:34:54.200
 through and highlighted each one of them and I can get my notes if you'd like but

02:34:54.200 --> 02:34:59.000
 I really don't think that would be better overall for the neighborhood after

02:34:59.000 --> 02:35:03.880
 I took a look at it and plus if we want the type of developer we want they need

02:35:03.880 --> 02:35:10.240
 in Li zoning for their for their industrial developments. Commissioner

02:35:10.240 --> 02:35:22.520
 Pruitt. Thank you chair question for Lisa I think or yeah sorry in just a

02:35:22.520 --> 02:35:27.040
 second perhaps for Tina just to make sure I understand this concept of the

02:35:27.040 --> 02:35:33.760
 no-build easement I believe in some other cases in town although those are

02:35:33.760 --> 02:35:39.040
 in special agreements we've had some conservation easements as opposed to

02:35:39.040 --> 02:35:43.920
 no-build easements is that at all enforceable without a PD type zoning

02:35:43.920 --> 02:35:49.800
 regulation independent of of that or is that no different than a no-build

02:35:49.800 --> 02:35:54.080
 easement from the enforceability that you would need? So it's my understanding

02:35:54.080 --> 02:35:58.720
 and I'm gonna look to my team that the conservation easement I believe is

02:35:58.720 --> 02:36:02.080
 applicable to items potentially with respect to our environmentally sensitive

02:36:02.080 --> 02:36:07.560
 areas I'm getting some affirmative nods I think I'm speaking correctly so and so

02:36:07.560 --> 02:36:11.880
 it's more tied to the environmentally sensitive areas so in in this case

02:36:11.880 --> 02:36:16.400
 because this is not that there's not an ESA on the south side of this property

02:36:16.400 --> 02:36:21.160
 the conservation easement would not be an appropriate mechanism. Thank you that

02:36:21.160 --> 02:36:31.720
 answers that. Good question. Lisa I get the sense that a lot of the concern could

02:36:31.720 --> 02:36:38.080
 be because it's a concept plan we don't know all the possibilities that could

02:36:38.080 --> 02:36:45.040
 happen to it with respect to setbacks from the parcel that's not in this

02:36:45.040 --> 02:36:50.320
 straight zoning case right from the from the border of the parcel in question

02:36:50.320 --> 02:36:58.400
 essentially. Can you tell us basically if someone else were to come in say the

02:36:58.400 --> 02:37:03.000
 land got sold off somebody else came in and were to to do a different concept

02:37:03.000 --> 02:37:09.760
 plan right and they had the LI zoning would it be possible to move that

02:37:09.760 --> 02:37:14.400
 southern building appreciably closer to the southern border or is this shown

02:37:14.400 --> 02:37:21.720
 basically where that setback requirement would limit that building's southward

02:37:21.720 --> 02:37:27.720
 motion does that make sense I'm trying to bound you know if it changed could

02:37:27.720 --> 02:37:33.000
 it just kind of reformat in the northern portion or could it actually become more

02:37:33.000 --> 02:37:39.040
 encroaching to the community to the south. Right yes if the portion that is

02:37:39.040 --> 02:37:42.160
 up for the zoning request was sold to somebody else and they decide to do

02:37:42.160 --> 02:37:47.680
 something else they would still have to go according to the DDC setbacks and the

02:37:47.680 --> 02:37:53.040
 landscape buffer that would be required because that property would still be

02:37:53.040 --> 02:38:01.720
 zoned RR I don't know offhand what the setback is but and I don't know offhand

02:38:01.720 --> 02:38:06.400
 what the setback they're proposing is if they even have an exact setback yet but

02:38:06.400 --> 02:38:10.600
 there would still be a setback with the landscape buffer. So it's it's within the

02:38:10.600 --> 02:38:15.120
 realm of how it's shown it's not gonna be half a building width closer or

02:38:15.120 --> 02:38:21.280
 something like that right okay. And I want to bring up again I know Tina did

02:38:21.280 --> 02:38:27.840
 before but if y'all decide that this would be best to consider this as a PD

02:38:27.840 --> 02:38:34.600
 that we would have to re-notice if we want to include the ag tract in it and

02:38:34.600 --> 02:38:40.240
 in addition the PD does require full ZCP plans so a site plan and landscape plan

02:38:40.240 --> 02:38:44.360
 and tree plans and so all of that takes a lot of time to put together because

02:38:44.360 --> 02:38:50.440
 they have not had to put have had to do that yet this is a concept plan so just

02:38:50.440 --> 02:38:52.760
 so you know that that would not be coming back at the next meeting or

02:38:52.760 --> 02:39:01.520
 anything like that so make sure y'all are aware. Yeah so I don't know which

02:39:01.520 --> 02:39:09.560
 direction we're leaning but I'm I'm thankful that it was brought as a

02:39:09.560 --> 02:39:17.060
 straight zoning to consider it that way because I think the things that the

02:39:17.060 --> 02:39:22.000
 community is really concerned about are a very very small subset of what a PD

02:39:22.000 --> 02:39:31.400
 would codify right and we just have to be very careful to over constrain the

02:39:31.400 --> 02:39:38.000
 uses and and site details that would be perfectly fine right because all

02:39:38.000 --> 02:39:46.080
 essentially that just adds time and cost so you know we'll see what happens. Well

02:39:46.080 --> 02:39:49.480
 and I just wanted to make a point to what you were questioning about with

02:39:49.480 --> 02:39:52.160
 this concept plan you know it's not a matter of like just building one

02:39:52.160 --> 02:39:56.600
 getting moved if they sold the land it it doesn't have to be this doesn't have

02:39:56.600 --> 02:40:02.160
 to be warehouse it could be anything that's in LI period you know so it's not

02:40:02.160 --> 02:40:07.120
 a matter of looking at this plan and and and it getting changed because this plan

02:40:07.120 --> 02:40:13.280
 doesn't exist it's just a concept and it's the use doesn't exist nothing there

02:40:13.280 --> 02:40:19.120
 is no use that exists yet and there won't be a use that exists yet if this

02:40:19.120 --> 02:40:24.440
 gets changed to LI it'll be whatever's allowed in LI that's that's the uses

02:40:24.440 --> 02:40:29.760
 available. Yeah and to be fair I wasn't trying to ascertain the use I was trying

02:40:29.760 --> 02:40:36.600
 to ascertain the the geographical freedom with which a building that would

02:40:36.600 --> 02:40:41.400
 be developed on this site could move if if the approximate location that this is

02:40:41.400 --> 02:40:47.280
 shown is pretty much as as far south as it could go given the the RR piece just

02:40:47.280 --> 02:40:54.040
 south of there. Okay understood. Any other discussion we can entertain a

02:40:54.040 --> 02:40:57.080
 motion more questions?

02:41:02.440 --> 02:41:12.280
 Okay, no one wants to do anything. Commissioner Pruitt. I'm gonna move approval as presented I

02:41:12.280 --> 02:41:21.920
 think you know change is hard and as we as we go forward like I said earlier we

02:41:21.920 --> 02:41:30.280
 just we need to be very careful that we have confidence in in how things are

02:41:30.280 --> 02:41:36.760
 being handled and protected and staff to to do their diligence but we need to not

02:41:36.760 --> 02:41:45.760
 put so many handcuffs on things that that we inadvertently hamper the the

02:41:45.760 --> 02:41:52.600
 development of the area in other ways so thank you. Thank you Commissioner

02:41:52.600 --> 02:41:59.680
 Commissioner Smith. Thank you Chair. More thought about it the more that the

02:41:59.680 --> 02:42:06.720
 restrictions that will come with the PD would I think it would basically be

02:42:06.720 --> 02:42:12.000
 cutting off the nose despite the face if we did it that we'd be restricting the

02:42:12.000 --> 02:42:17.040
 piece of land to specific uses without specific buyers on the inside of it it

02:42:17.040 --> 02:42:23.640
 would cause a lot of undue returns back to make amendments to the PDs while the

02:42:23.640 --> 02:42:28.920
 deed restriction and leaving that section as RR isn't in my opinion the

02:42:28.920 --> 02:42:34.440
 most beneficial and most protective way for the neighborhood the fact that

02:42:34.440 --> 02:42:39.560
 there's I'm not good at numbers even though I'm in finance 40 50 people in

02:42:39.560 --> 02:42:43.760
 this room right now who are hearing us have this conversation I'm just gonna

02:42:43.760 --> 02:42:47.880
 tell you that you're the you're the check-in balance in this one so the the

02:42:47.880 --> 02:42:52.480
 city and this council this Commission won't be there to hold that piece of

02:42:52.480 --> 02:42:58.440
 land to agriculture if it comes back and wants to be rezoned so without it I

02:42:58.440 --> 02:43:00.960
 think that it's a it's a tough decision and I'm just gonna trust staff on this

02:43:00.960 --> 02:43:08.040
 one so I'll second okay we have a first and a second for approval of the request

02:43:08.040 --> 02:43:34.960
 any discussion okay okay just for the homeowners I know some of the projects

02:43:34.960 --> 02:43:38.580
 mr. Ramsey and his group have done in the past and they do good they do really

02:43:38.580 --> 02:43:42.680
 good work they are their group of integrity that's a slide show said

02:43:42.680 --> 02:43:46.680
 they're integrity you know they have integrity and they're honest people I do

02:43:46.680 --> 02:43:52.600
 find that truthful they are good people with that being said I think they're

02:43:52.600 --> 02:43:56.440
 gonna do what you're gonna ask them to do I think they're gonna be honest and

02:43:56.440 --> 02:44:02.240
 uphold their end of that bargain so you know I'm gonna vote for this thing I do

02:44:02.240 --> 02:44:06.680
 want didn't do stay rural I totally understand your concerns I lived in a

02:44:06.680 --> 02:44:12.080
 rural neighborhood in pilot point myself had to move away but we'd like to keep

02:44:12.080 --> 02:44:17.480
 it as as well as it has been for the past 59 years that you know that the

02:44:17.480 --> 02:44:21.800
 neighborhoods have been there but change is coming I mean loop treated it's

02:44:21.800 --> 02:44:26.600
 coming around there things are going to happen as many of you said we'd rather

02:44:26.600 --> 02:44:32.920
 have it light industrial and have it some warehousing there instead of

02:44:32.920 --> 02:44:36.200
 businesses they're gonna have you know four or five hundred cars coming through

02:44:36.200 --> 02:44:40.760
 there a day you know cars and not not 18-wheelers 18-wheelers aren't I have a

02:44:40.760 --> 02:44:45.880
 feeling that 18-wheelers are not gonna come through your neighborhood if it was

02:44:45.880 --> 02:44:52.160
 multifamily more housing you're gonna have people in their cars cutting

02:44:52.160 --> 02:44:56.560
 through your neighborhoods a lot faster than 18-wheelers are and with this with

02:44:56.560 --> 02:45:00.920
 that being said they're gonna try to divert I think they're traffic is gonna

02:45:00.920 --> 02:45:05.880
 be trying to be diverted around your neighborhoods and but anyway I think

02:45:05.880 --> 02:45:10.920
 this is the lesser two of lesser of two evils to be honest with you and with

02:45:10.920 --> 02:45:15.160
 that being said I think they are gonna keep their word and do what they said

02:45:15.160 --> 02:45:19.800
 and try to put as much green space between your neighborhood and their

02:45:19.800 --> 02:45:24.520
 development and anyway I just want to let you know about that and but they

02:45:24.520 --> 02:45:28.320
 they are they are a good company there they do keep their word so thank you

02:45:28.320 --> 02:45:38.160
 chair anybody else with discussion we vote so I'll just say a few words thank

02:45:38.160 --> 02:45:46.280
 you everyone for coming out and sharing your thoughts you know it is I've

02:45:46.280 --> 02:45:52.440
 struggled with this as you heard me talk in work session because I think staff

02:45:52.440 --> 02:45:56.360
 unfortunately in my opinion missed the boat on this and should have steered

02:45:56.360 --> 02:46:02.880
 this developer toward a planned development because of the safety

02:46:02.880 --> 02:46:06.480
 measures that we should be able to put in place for this established

02:46:06.480 --> 02:46:14.280
 neighborhood this is a special part of our community and this is a highly

02:46:14.280 --> 02:46:20.440
 respected group of developers Brandon Lee Jen I see Thomas up there this is a

02:46:20.440 --> 02:46:26.400
 great group of people in town so it is nothing against this group but I don't

02:46:26.400 --> 02:46:34.360
 ever consider a straight zoning change without thinking about all the

02:46:34.360 --> 02:46:38.080
 ramifications and I can't just say because you're great people here you're

02:46:38.080 --> 02:46:41.480
 gonna keep your word I just don't work like that sitting on this commission and

02:46:41.480 --> 02:46:46.400
 I never have in the almost six years that I've been here so I think we missed

02:46:46.400 --> 02:46:51.400
 the boat on this as a city because I think yes change is coming and yes a

02:46:51.400 --> 02:46:56.800
 development is gonna happen but it could have been a better development and we

02:46:56.800 --> 02:47:00.400
 could have had safeguards in place to where these homeowners who have been

02:47:00.400 --> 02:47:06.120
 here living in this little rural spot that we have up there that have gone

02:47:06.120 --> 02:47:10.360
 unprotected and unplanned through the years they could have had some

02:47:10.360 --> 02:47:15.320
 safeguards in place and left you know feeling a little bit more protected not

02:47:15.320 --> 02:47:19.160
 that they think nothing is going to happen with this land that's north of

02:47:19.160 --> 02:47:27.200
 them but that it could happen with safeguards in place so that being said I

02:47:27.200 --> 02:47:31.000
 don't see any other people wishing to speak let's go ahead and vote on the

02:47:31.000 --> 02:47:33.120
 board

02:47:46.080 --> 02:47:53.160
 that is a tie vote and motion fails three three Commissioner Smith

02:47:53.160 --> 02:48:04.160
 Commissioner Smith make a motion to cut the tide if it's a tie so that goes the

02:48:04.160 --> 02:48:08.200
 tire vote fails correct cuz we didn't get four or does it does it fault does

02:48:08.200 --> 02:48:11.600
 it fail to a denial or is it failed to it fails to pass therefore you know the

02:48:11.600 --> 02:48:16.920
 motion correct for affirmative votes right it failed was this oh it I think

02:48:16.920 --> 02:48:20.160
 we're both on the same page go for it actually in this instance because it's a

02:48:20.160 --> 02:48:24.200
 tie vote the code says that it would come back at the next meeting as an

02:48:24.200 --> 02:48:29.360
 individual consideration item in the in the essence of the code the ordinance

02:48:29.360 --> 02:48:34.560
 that we passed previously when it's a tie due to recusal there was a we had a

02:48:34.560 --> 02:48:38.320
 piece on that in PNC for that bar G you want to correct you want to correct me

02:48:38.320 --> 02:48:41.520
 on that one is a tie for recusal knowing that it's gonna come back next meeting

02:48:41.520 --> 02:48:45.240
 but Commissioner Cole will have to recuse again here by me what the rules

02:48:45.240 --> 02:48:47.640
 are on that

02:48:47.640 --> 02:48:55.800
 rezoning procedures in the DDC actually specify exactly what Hillary said it

02:48:55.800 --> 02:48:58.640
 has to come back as an individual consideration at our next meeting I

02:48:58.640 --> 02:49:02.920
 made if it ties again at that point it would move forward to City Council as a

02:49:02.920 --> 02:49:06.120
 recommendation of denial but would not trigger the supermajority vote okay I

02:49:06.120 --> 02:49:08.960
 couldn't remember I could remember what our changes the rule but we what we've

02:49:08.960 --> 02:49:11.560
 made on that one when that happened when this happened before when it's been tied

02:49:11.560 --> 02:49:16.720
 due to a recusal so not an absence so thank you then we will see this again at

02:49:16.720 --> 02:49:26.440
 our next meeting okay so we will move on on our agenda and so Commissioner

02:49:26.440 --> 02:49:40.840
 McDade it will not be a public hearing it but people can speak at an individual

02:49:40.840 --> 02:49:49.040
 consideration item yes Tina did you have something to say or no yeah I was just

02:49:49.040 --> 02:49:53.400
 gonna add to that that you're correct it's it's not advertised as a public

02:49:53.400 --> 02:49:56.760
 hearing but since it is individual consideration the Commission is allowed

02:49:56.760 --> 02:50:00.960
 to receive comment the other thing I will note to folks that are in the

02:50:00.960 --> 02:50:05.440
 audience is again you would not receive any notice from the city no mail notices

02:50:05.440 --> 02:50:08.800
 like you did in advance at this meeting so if you're interested in the outcome

02:50:08.800 --> 02:50:12.400
 that occurs at the Planning and Zoning Commission's next meeting then I would

02:50:12.400 --> 02:50:19.720
 encourage you to to come and attend the meeting so the in the next Planning and

02:50:19.720 --> 02:50:23.520
 Zoning Commission meeting is two weeks from tonight and my apologies that let

02:50:23.520 --> 02:50:34.960
 me look at the date thank you May 11th okay that takes us to our Planning and

02:50:34.960 --> 02:50:45.320
 Zoning matrix Tina I will give the floor to you thank you so included within your

02:50:45.320 --> 02:50:50.800
 packet was our matrix and some of these items given the work session discussion

02:50:50.800 --> 02:50:55.700
 that we had earlier this afternoon as Haley pointed out there are several

02:50:55.700 --> 02:51:00.040
 items that we are working through to be able to address since some of these have

02:51:00.040 --> 02:51:03.960
 been riding on the matrix for a while but obviously the the first item on the

02:51:03.960 --> 02:51:07.640
 list was our discussion about the opt-in system for the notification so I believe

02:51:07.640 --> 02:51:12.320
 we've we've checked the box on that one and so that would be coming off in that

02:51:12.320 --> 02:51:17.920
 regard but it's you know can you give it a minute oh yeah absolutely

02:51:17.920 --> 02:51:30.040
 sorry I just couldn't even hear you so that's all right thank you

02:51:42.320 --> 02:51:51.560
 okay I'll let folks get down the stairs also just a little bit since that carries

02:51:51.560 --> 02:52:04.520
 to okay can you all hear me okay great okay so what I was saying is with the

02:52:04.520 --> 02:52:08.200
 matrix that's included in your packet and Haley's presentation that she gave

02:52:08.200 --> 02:52:12.200
 earlier this evening or afternoon in our work session I think we've got a plan

02:52:12.200 --> 02:52:16.400
 in place to address several of the items that are on this matrix and I know some

02:52:16.400 --> 02:52:19.280
 of them been on here for a little bit of time and so hence why we wanted to put a

02:52:19.280 --> 02:52:23.800
 plan in place to knock some of these items off and be responsive to you the

02:52:23.800 --> 02:52:27.840
 very first item on the list though with respect to the opt-in system for

02:52:27.840 --> 02:52:31.240
 notifications on projects I feel like we've accomplished that tonight so if

02:52:31.240 --> 02:52:33.680
 it's with the concurrence of the Commission we'll go ahead and remove that

02:52:33.680 --> 02:52:39.920
 item from the matrix in addition just to give the Commission an update on some

02:52:39.920 --> 02:52:45.120
 items that went to City Council back on April 19th we had three requests that

02:52:45.120 --> 02:52:49.960
 were on the agenda the first one was a request to reason property from rural

02:52:49.960 --> 02:52:55.880
 residential to our excuse me R1 this was roughly two acres of property over off

02:52:55.880 --> 02:53:01.640
 of Mosh Branch Road about 2100 feet south of FM 1173 if you recall the

02:53:01.640 --> 02:53:04.960
 property owner was requesting to rezone that property so that they can meet

02:53:04.960 --> 02:53:08.120
 minimum lot size requirements in order to plot the property to get a building

02:53:08.120 --> 02:53:11.920
 permit for a single-family resident so City Council did approve that unanimously

02:53:11.920 --> 02:53:16.720
 seven with a 7-0 vote we also had another item which was a specific use

02:53:16.720 --> 02:53:21.060
 permit for a townhome development on roughly an eight acre track near May

02:53:21.060 --> 02:53:27.080
 Hill and prominence Parkway that was also approved 7-0 by council and then

02:53:27.080 --> 02:53:30.720
 the third item we had on the agenda that night was the razor ranch landscape

02:53:30.720 --> 02:53:35.000
 plan amendment on the north side of 380 associated with the Home Depot

02:53:35.000 --> 02:53:39.620
 development and there was much discussion on that particular item

02:53:39.620 --> 02:53:43.920
 particularly as it relates to vehicle connectivity and bicycle and pedestrian

02:53:43.920 --> 02:53:46.880
 connectivity and how that can be achieved in the area and what's the

02:53:46.880 --> 02:53:53.840
 safer means of accomplishing that and ultimately with the City Council

02:53:53.840 --> 02:53:59.680
 approved that request 6-1 and so just you know we did work with the applicant

02:53:59.680 --> 02:54:04.400
 on the connectivity issues there is existing north-south connectivity that's

02:54:04.400 --> 02:54:07.720
 a result of some properties that are currently under development more towards

02:54:07.720 --> 02:54:14.200
 the north and east and then also opportunities for better pedestrian and

02:54:14.200 --> 02:54:18.160
 bicycle connectivity from the residential areas to the north back down into that

02:54:18.160 --> 02:54:21.600
 overall development there was discussion about trying to have all that

02:54:21.600 --> 02:54:25.560
 connectivity occur more closer to the Home Depot development there's some great

02:54:25.560 --> 02:54:29.160
 changes there we did not want to introduce pedestrians and bicyclists in

02:54:29.160 --> 02:54:33.820
 an area that's predominantly truck in loading zone areas so in the end the

02:54:33.820 --> 02:54:39.080
 connectivity happened and as a result of also past efforts thanks to those three

02:54:39.080 --> 02:54:43.440
 individuals sitting over there and but nonetheless that project ended up being

02:54:43.440 --> 02:54:49.360
 approved so and that's all we had on the council agenda for that evening

02:54:49.360 --> 02:54:54.400
 Commissioner Anderson thanks here I was just somebody on council was worried

02:54:54.400 --> 02:55:00.160
 about bicycle connectivity to Home Depot I've never seen anybody ride a bicycle

02:55:00.160 --> 02:55:05.960
 to buy something Home Depot well some of us have had similar observations but

02:55:05.960 --> 02:55:10.120
 there was one or two people in the neighborhood to the north that were

02:55:10.120 --> 02:55:15.320
 interested in having that connectivity to be able to really I think more to be

02:55:15.320 --> 02:55:19.720
 able to go south just because of some of the other vehicular child or circulation

02:55:19.720 --> 02:55:24.000
 challenges within that overall area with the the traffic that's along 380 Bonnie

02:55:24.000 --> 02:55:29.160
 Bray and so just wanting that ability to be able to get to the the uses that are

02:55:29.160 --> 02:55:31.920
 further south within that development I think not just the Home Depot but some

02:55:31.920 --> 02:55:41.280
 of the other businesses that are there anything for the matrix any concluding

02:55:41.280 --> 02:55:49.280
 items okay see none I will close our meeting at 819 p.m. thank you everyone

02:55:49.280 --> 02:55:51.920
 congratulations