1 00:00:00,000 --> 00:00:09,760 Good morning. It's 9 o'clock. I'd like to call the Public Utility Board of Monday, March 2 00:00:09,760 --> 00:00:17,640 28th, 2022 to order. With that, we will accept any presentation from members of the public. 3 00:00:17,640 --> 00:00:24,200 Is there anyone out there that would like to address the Public Utility Board? Seeing 4 00:00:24,200 --> 00:00:31,720 none, we'll move on to the consent agenda. Would any member of the board like to move 5 00:00:31,720 --> 00:00:41,280 one of them out for discussion? Mr. Beck? Yes, I just want a little clarification on the 6 00:00:41,280 --> 00:00:49,600 wording in item A. Item A? Yes, sir. Okay. Any others? If not, we'll entertain a motion 7 00:00:49,600 --> 00:00:59,920 to approve item B. So moved. Second. We have a motion and a second. All those in favor, 8 00:00:59,920 --> 00:01:06,160 please say aye. Aye. Any opposed? There being none, we'll move on to consent agenda item 9 00:01:06,160 --> 00:01:11,800 A. Thank you, Chair. The wording in it just kind of caught my attention. It says that 10 00:01:11,800 --> 00:01:20,920 this energy market price data, ETERM, is the sole provider of this software, which provides 11 00:01:20,920 --> 00:01:25,120 that procurement of commodities and service that are available from one source are exempt 12 00:01:25,120 --> 00:01:32,040 from competitive bidding. So are we saying that there's no other source and therefore 13 00:01:32,040 --> 00:01:46,440 competitive bidding isn't a factor or what? I'm Smith Day. I'm the regulatory risk division 14 00:01:46,440 --> 00:01:54,480 manager with DME and I've got a little bit of knowledge on this item. Okay. We're actually 15 00:01:54,480 --> 00:02:01,200 not saying that this is the only source of this data. There are providers. However, given 16 00:02:01,200 --> 00:02:10,240 the procurement regulations, it can be treated as sole source if it's, as a practical matter, 17 00:02:10,240 --> 00:02:16,600 the only practical way to get the data that works for us. And the reason that this data 18 00:02:16,600 --> 00:02:21,840 is in that category, that unique category, is because the ETERM system, and I don't want 19 00:02:21,840 --> 00:02:26,800 to kill you with acronyms, but it's energy trading and risk management system. That's 20 00:02:26,800 --> 00:02:33,640 the actual software and that's where we put our power and energy portfolio in to gauge 21 00:02:33,640 --> 00:02:41,320 it against the market. The only way that tool works is if we feed it market data. And this 22 00:02:41,320 --> 00:02:46,720 market data provider provides us market data, and they're not the only one, but they provide 23 00:02:46,720 --> 00:02:53,580 us market data in a unique configuration that would match when we implemented the software. 24 00:02:53,580 --> 00:03:00,760 So to get a different vendor means we would have to tear out the current configuration 25 00:03:00,760 --> 00:03:07,360 and get a great expense to get a different vendor. You said the key element, great expense. 26 00:03:07,360 --> 00:03:15,720 Okay. All right. Thank you. If there's any more questions, I can... Thank you, Smith. 27 00:03:15,720 --> 00:03:20,840 All right. Thank you. You okay with that, Mr. Beck? Everything okay for you? Everything 28 00:03:20,840 --> 00:03:28,480 okay for you on that? Okay. All right. Well, if there is no further discussion, entertain 29 00:03:28,480 --> 00:03:39,080 a motion for item A. Motion? Second. And a second. Any further discussion? If not, all 30 00:03:39,080 --> 00:03:46,640 those in favor, please say aye. Aye. Any opposed? Passes unanimously. Now we'll move on to items 31 00:03:46,640 --> 00:03:51,440 for individual consideration, the first one being item A, which is the approval of March 32 00:03:51,440 --> 00:04:00,800 14th minutes. Any corrections or discussion on those? There being none, entertain a motion 33 00:04:00,800 --> 00:04:12,360 for item A. So moved. Motion to approve. We have a second. All those in favor, please 34 00:04:12,360 --> 00:04:29,600 say aye. Aye. Okay. I'm going to recuse myself on item B. Good morning. Item B for individual 35 00:04:29,600 --> 00:04:35,520 consideration is to consider recommending adoption of an ordinance. The City of Denton, 36 00:04:35,520 --> 00:04:39,200 Texas Home-ruled Municipal Corporation authorizing the city manager to execute a contract with 37 00:04:39,200 --> 00:04:43,800 Texas Materials Group DBA tech spit for the construction of the Southeast Denton Package 38 00:04:43,800 --> 00:04:50,280 A project consisting of 22 roadway segments, including water and wastewater main replacement 39 00:04:50,280 --> 00:04:55,120 located in Southeast Denton in the Southeast Denton neighborhood. I believe we have a presentation. 40 00:04:55,120 --> 00:04:58,840 Yes, sir. Good morning, board members. My name is Seth Garcia. I'm a program manager 41 00:04:58,840 --> 00:05:03,080 with Capital Broadchecks. As he stated, I have a brief presentation for you for Southeast 42 00:05:03,080 --> 00:05:09,120 Denton Package A. So just quickly, this package is a part of our neighborhood rehabilitation 43 00:05:09,120 --> 00:05:13,280 program, which is associated with the 2019 bond program. And this is for the award of 44 00:05:13,280 --> 00:05:19,600 the construction contract. So for a brief project scope, Southeast Denton Package A 45 00:05:19,600 --> 00:05:24,320 is reconstruction of the first 22 segments of a total of 72 segments we're going to be 46 00:05:24,320 --> 00:05:30,160 doing in Southeast Denton. It includes full street reconstruction, replacement of aging 47 00:05:30,160 --> 00:05:34,520 water and wastewater mains. We also have some improved sidewalk connectivity. So we're going 48 00:05:34,520 --> 00:05:39,160 to be filling some gaps. We're correcting all noncompliant ADA ramps on the segments 49 00:05:39,160 --> 00:05:44,000 that we're touching, as well as some various traffic calming measures. So currently on 50 00:05:44,000 --> 00:05:48,680 that section of Mill and Moore Street that you can see, the width is about 40 feet. So 51 00:05:48,680 --> 00:05:53,200 we're instituting some bump outs that's actually going to narrow the roadway to about 30 feet 52 00:05:53,200 --> 00:05:57,320 at the intersections to give the appearance of a smaller roadway to kind of discourage 53 00:05:57,320 --> 00:06:07,840 speeding there. So with this project, we did receive five proposals. It was bid using CSP. 54 00:06:07,840 --> 00:06:16,720 The highest ranked firm was Texas BIT, and their total base proposal was just over $6.3 55 00:06:16,720 --> 00:06:22,640 million. So quickly to touch on the schedule of this project. So this is the first-- 56 00:06:22,640 --> 00:06:28,120 Excuse me, sir. Could you go back to the previous slide for a moment? Yes, sir. I just didn't 57 00:06:28,120 --> 00:06:36,120 see your scoring while you were talking. Yeah, I'm sorry. Thank you. Absolutely. So quickly 58 00:06:36,120 --> 00:06:40,600 just to touch on the schedule of this project. So the first 22 segments we began design in 59 00:06:40,600 --> 00:06:46,480 March of 2021. We had made a commitment to city council and to the representatives in 60 00:06:46,480 --> 00:06:50,800 district one that we were going to advertise this project by the end of the year. So we 61 00:06:50,800 --> 00:06:57,560 did meet that promise. It advertised in quarter four of 2021. We opened bids in January. We 62 00:06:57,560 --> 00:07:03,800 are anticipating that construction is going to begin in quarter two of 2022. It's a 365 63 00:07:03,800 --> 00:07:08,980 day project for substantial completion. And that would put us completing the project somewhere 64 00:07:08,980 --> 00:07:18,000 near quarter two of 2023, of course, pending weather. So with that staff recommends a contract 65 00:07:18,000 --> 00:07:23,560 between the city of Denton and Texas bit and just over $6.6 million. And this does include 66 00:07:23,560 --> 00:07:30,640 the 5% contingency. So it's the base bid of 6.3 plus the 5% contingency for a total NTE 67 00:07:30,640 --> 00:07:44,120 of 6.6. And with that, I can take any questions. Any questions? I do have one. I wasn't here 68 00:07:44,120 --> 00:07:53,260 for the initial project approval. I'm just curious on the very first map, first slide 69 00:07:53,260 --> 00:08:01,200 with the map, what are the red dotted lines? Yeah. So the red dotted lines represent wastewater 70 00:08:01,200 --> 00:08:04,680 lines that we're going to be replacing. So if you see a red dash line, that means the 71 00:08:04,680 --> 00:08:09,640 wastewater line was due for replacement. The blue lines represent the water main. So I 72 00:08:09,640 --> 00:08:14,800 believe of the 6.3 million, we had just over 1.7 million in water main replacement and 73 00:08:14,800 --> 00:08:20,480 1.6 million in wastewater main replacement. And then the bond segments, sidewalks, all 74 00:08:20,480 --> 00:08:27,680 that was just over $3 million of the total contract price. And on the sidewalk connectivity, 75 00:08:27,680 --> 00:08:32,260 is it only where existing sidewalks were or will all of the streets receive sidewalks? 76 00:08:32,260 --> 00:08:37,320 No. So it's only we're filling a couple gaps. One of the major gaps was on Robertson. So 77 00:08:37,320 --> 00:08:42,400 we have continuous sidewalk coming down Bell. We had an area of about 100 feet left out 78 00:08:42,400 --> 00:08:47,520 on Robertson. So we're proposing to connect that gap. It'll provide then continuous sidewalk 79 00:08:47,520 --> 00:08:52,040 kind of going over to the Fred Moore High School. One other piece of sidewalk that we're 80 00:08:52,040 --> 00:08:57,320 installing that is not currently there is the little triangle shape on Y Street. So 81 00:08:57,320 --> 00:09:02,680 that's actually owned by Parks and Recreation. So we're proposing to put in two legs of sidewalk 82 00:09:02,680 --> 00:09:07,520 there with the thought that there may be a future community garden or something that 83 00:09:07,520 --> 00:09:11,920 could go into that small area. And so since we're coming in with the project, we're going 84 00:09:11,920 --> 00:09:15,840 to utilize the economies of scale to go ahead and put in a couple legs of sidewalk there 85 00:09:15,840 --> 00:09:20,940 for them. And does Mill Street currently have sidewalks? Mill Street does not. So it does 86 00:09:20,940 --> 00:09:27,760 behind the Fred Moore School. So that's where we're instituting those bump outs. We are 87 00:09:27,760 --> 00:09:32,960 putting ramps on the bump outs. So there will be a potential for in the future to put an 88 00:09:32,960 --> 00:09:37,280 on street path that will be protected by those bump outs. 89 00:09:37,280 --> 00:09:47,400 Thank you. Yes, sir. If there are no further questions and entertain a motion. Motion to 90 00:09:47,400 --> 00:09:55,520 approve. Second. Second. Second. All in favor? Aye. Motion passes unanimously. Great. Thank 91 00:09:55,520 --> 00:10:17,520 you all. We'll take just a moment to get our acting chair back in the meeting. Okay. Next 92 00:10:17,520 --> 00:10:32,760 item for individual consideration is item number C. Randy? Oh, yes. I'm sorry. Yes. 93 00:10:32,760 --> 00:10:37,520 Item C and D need to be called together. Voted on separately. So Randy is going to present 94 00:10:37,520 --> 00:10:43,520 C and D together with one presentation. Yes, sir. Thank you. Randy Klingel, Treasury Manager 95 00:10:43,520 --> 00:10:48,280 within the Finance Department. I am going to speak a little bit about the notice of 96 00:10:48,280 --> 00:10:52,640 intent process for issuing CO debt for the city of Denton. This is a standard process 97 00:10:52,640 --> 00:11:00,080 we have for the CO sale anytime the city goes out for a bond sale. The purpose of a notice 98 00:11:00,080 --> 00:11:05,160 of intention is by the local government code chapter C of the Certificate of Obligation 99 00:11:05,160 --> 00:11:11,000 Act, which requires us to give the public notice of our intent to issue COs. We must 100 00:11:11,000 --> 00:11:15,000 publish this in the newspaper, our journal newspaper, the city of Denton will be published 101 00:11:15,000 --> 00:11:22,320 there along with our city website. The publication must be put out once a week in two consecutive 102 00:11:22,320 --> 00:11:27,840 weeks, which will start that around April 14th of next month, which we're almost on 103 00:11:27,840 --> 00:11:32,520 top of April. A passage of a bond ordinance, or sometimes we call it a parameter ordinance, 104 00:11:32,520 --> 00:11:38,640 it's kind of an interchangeable term, will be authorized in the sale of the COs for at 105 00:11:38,640 --> 00:11:44,000 least 46 days after the date of the first publication. So most of the slide presentation 106 00:11:44,000 --> 00:11:48,480 you'll see here are the list of projects for these CO sales. They are also listed in your 107 00:11:48,480 --> 00:11:55,240 AIS independently, depending on which utility that we're looking at. So the first one is 108 00:11:55,240 --> 00:12:00,920 the solid waste project list totaling $6.9 million, which is in your list. And these 109 00:12:00,920 --> 00:12:05,680 were also part of the CIP budget process. So it's not any new projects that you're seeing 110 00:12:05,680 --> 00:12:09,160 here, they are part of the process that you've seen throughout the year. So the solid waste 111 00:12:09,160 --> 00:12:24,200 total is at 6.9. There we go. Water is at 23.4 million. The wastewater projects usually 112 00:12:24,200 --> 00:12:29,320 take two slides, they're very detail oriented, so they have a lot going on over wastewater. 113 00:12:29,320 --> 00:12:35,720 They have $44.2 million coming up for the CO sale and rounding out with electric at 114 00:12:35,720 --> 00:12:43,640 52.9, bringing the total of the three utilities at $120.6 million. And these are pretty close 115 00:12:43,640 --> 00:12:48,100 to budgeted items. They have a couple of months to tweak their process and see what they still 116 00:12:48,100 --> 00:12:51,160 need to come up in the bond sale that won't happen until June. So these numbers are most 117 00:12:51,160 --> 00:12:58,360 likely to reduce. So my next step is I'll come back in May to this board to do the parameters 118 00:12:58,360 --> 00:13:02,640 or bond ordinance. Well, you'll see a final project list to go out for the CO sale. Then 119 00:13:02,640 --> 00:13:07,040 we'll take that recommendation following to council. We'll look at a preliminary date 120 00:13:07,040 --> 00:13:12,080 for the bond sale in June and then actually close the sale and receive the bond proceeds 121 00:13:12,080 --> 00:13:20,800 in late July. And that is my presentation today. Open for any questions. And we do have 122 00:13:20,800 --> 00:13:23,120 the department here as well if you have any project specific. 123 00:13:23,120 --> 00:13:25,800 Yes, ma'am. What are the terms of these bonds? 124 00:13:25,800 --> 00:13:30,940 The terms, it depends on the project, anywhere from five years to 30 years. 125 00:13:30,940 --> 00:13:34,840 So even though we're authorizing a pool for sale, they vary in length. 126 00:13:34,840 --> 00:13:38,000 Yes, sir. Thank you. 127 00:13:38,000 --> 00:13:44,960 So just to clarify, the PUB has already approved all these things and this is now how to pay 128 00:13:44,960 --> 00:13:48,240 for it. Is that correct? Correct. The notice of intent is to show out what 129 00:13:48,240 --> 00:13:53,840 we can go out and get in the bond sale. But again, we'll come back with a hard number 130 00:13:53,840 --> 00:13:56,880 in June. Thank you. 131 00:13:56,880 --> 00:14:05,520 Any further questions? That should be good. So we're going to take item C for consideration 132 00:14:05,520 --> 00:14:08,760 or consideration for a motion. If anyone would like to make a motion. 133 00:14:08,760 --> 00:14:11,560 Move to approve. Pardon me? 134 00:14:11,560 --> 00:14:15,480 Move to approve. Okay. Mr. Ryback second. All those in favor, 135 00:14:15,480 --> 00:14:17,520 please say aye. Aye. 136 00:14:17,520 --> 00:14:23,480 Any opposed? There being no, we'll move on to item D, consider a motion to approve this. 137 00:14:23,480 --> 00:14:28,760 So moved. So moved, Mr. Jumper. Mr. Beck seconds. 138 00:14:28,760 --> 00:14:31,540 All those in favor, please say aye. Aye. 139 00:14:31,540 --> 00:14:36,520 Any opposed? Item D and C, both passed unanimously. 140 00:14:36,520 --> 00:14:42,240 Okay, item E, management reports. So Mr. Chair, members of the committee, of 141 00:14:42,240 --> 00:14:47,200 the board, so we have a couple items for you. The first item, and members of the finance 142 00:14:47,200 --> 00:14:51,920 department are here if you have any questions. We've provided to you the deck update for 143 00:14:51,920 --> 00:14:58,280 the month of September. I will tell you that they are working on getting the most current 144 00:14:58,280 --> 00:15:02,680 months completed and out to you guys here in the next couple of weeks. But they're here 145 00:15:02,680 --> 00:15:09,320 if you have any questions on that item. The next item is just future agenda items. Of 146 00:15:09,320 --> 00:15:14,880 course, what we have on here is just some dates for budget presentations. And again, 147 00:15:14,880 --> 00:15:19,760 that'll include water, wastewater, electric, solid waste, and also utility customer service 148 00:15:19,760 --> 00:15:26,400 that will be coming to you over a series of meetings with ultimate requests to approve 149 00:15:26,400 --> 00:15:32,520 or make a recommendation to council on July 11th. And just for your information, the city 150 00:15:32,520 --> 00:15:39,280 manager's proposed budget is due to the city council by July 31st. And so those are the 151 00:15:39,280 --> 00:15:44,320 hard dates that we're kind of looking at. And then the final item is just new action 152 00:15:44,320 --> 00:15:48,000 items. Again, these are items that have been on here for a little while that we're working 153 00:15:48,000 --> 00:15:53,200 on. I will let you know that there is one additional item that we didn't put on here 154 00:15:53,200 --> 00:15:59,160 that we will be putting on here. And the chair has asked DME to come back to the board with 155 00:15:59,160 --> 00:16:05,440 a presentation on renewable energy, kind of a 101 on what a rec is and how recs operate 156 00:16:05,440 --> 00:16:09,600 and how that impacts our portfolio. So we are going to be working on that. We're going 157 00:16:09,600 --> 00:16:15,360 to shoot for the next meeting to have that for you. Really meant for your information 158 00:16:15,360 --> 00:16:20,360 only, but hopefully that gets you some good background and knowledge as we're preparing 159 00:16:20,360 --> 00:16:25,600 to eventually come back to you with a revision to the then renewable resource plan. So those 160 00:16:25,600 --> 00:16:28,720 are the management items. If you have any questions on any of them, we've got a number 161 00:16:28,720 --> 00:16:36,560 of staff people here that can address that. Okay. Anything for Mr. Puente? If not, item 162 00:16:36,560 --> 00:16:41,600 number two is future agenda items. Is there any future agenda items any of the board members 163 00:16:41,600 --> 00:16:57,340 would like to put on? No? There's none there. So new business action items. It appears we're 164 00:16:57,340 --> 00:17:00,800 going to move right along. I'm going to be -- Susan is going to be jealous how fast I 165 00:17:00,800 --> 00:17:08,320 can get these things done. So we'll move on to concluding items. I don't think there's 166 00:17:08,320 --> 00:17:14,640 any of that. Those should have been covered in the future agenda items. If not, take that 167 00:17:14,640 --> 00:17:20,880 motion to conclude this meeting. Way to go, Lee. Second? All those in favor, please say 168 00:17:20,880 --> 00:17:27,120 aye. Aye. Thank you. Thank you. A lot of y'all here got you out here quick.