1 00:00:00,000 --> 00:00:07,040 now it is okay it is nine o'clock and we do have a quorum so a call to order the 2 00:00:07,040 --> 00:00:13,280 Monday March 14th 2022 City of Denton Public Utilities Board the first item is 3 00:00:13,280 --> 00:00:17,000 presentations from members of the public is there anyone from the public that 4 00:00:17,000 --> 00:00:24,440 wishes to speak I see none okay we'll move on into the consent agenda does any 5 00:00:24,440 --> 00:00:31,680 board member wish to pull an item from A through C I see none do we have a motion 6 00:00:31,680 --> 00:00:37,880 to approve the consent agenda move approved very moved Barbara seconded all 7 00:00:37,880 --> 00:00:44,300 in favor say aye aye opposed carries next item consider the approval of the 8 00:00:44,300 --> 00:00:51,640 February 28th 2022 minutes were there any changes or corrections to the minutes 9 00:00:54,440 --> 00:01:00,360 seeing none do we have a motion to approve the February 22 thank you and a 10 00:01:00,360 --> 00:01:08,400 second Larry's second all in favor say aye aye opposed all right item B consider 11 00:01:08,400 --> 00:01:12,560 recommending the adoption of ordinance with the City of Denton for Archer 12 00:01:12,560 --> 00:01:29,280 Western Construction LLC and the amount of 13 million five oh nine to 21 sure 13 00:01:43,440 --> 00:01:49,560 good morning my name is David Brown I am construction project manager for the 14 00:01:49,560 --> 00:01:54,680 City of Denton utilities today I'm here to can bring to you consideration of a 15 00:01:54,680 --> 00:02:00,320 project over at the Pecan Creek water reclamation plant this is called the 16 00:02:00,320 --> 00:02:05,960 salts handling project phase 1a and it is covering the effluent filters the 17 00:02:05,960 --> 00:02:13,680 aeration diffusers and the digester improvements we want to talk about today 18 00:02:13,680 --> 00:02:19,040 is basically the plant and what's out there today the current flows we'll talk 19 00:02:19,040 --> 00:02:23,600 about what tcq has as far as their recommendations and their requirements 20 00:02:23,600 --> 00:02:28,960 and then we'll go into what the phase 1a is and the selection process for a 21 00:02:28,960 --> 00:02:42,000 contractor let's look at the planet the plant is a is almost 60 years old so a 22 00:02:42,000 --> 00:02:47,240 lot of the key components there are at that age there's separate facilities 23 00:02:47,240 --> 00:02:53,920 there but it's all one big facility and and those extra things are getting old 24 00:02:53,920 --> 00:02:58,960 those facilities are getting old so there's a multitude of things we want to 25 00:02:58,960 --> 00:03:03,400 do and replace like the sand filters which are currently you sand media and 26 00:03:03,400 --> 00:03:09,000 then of course the diffusers that are in this project and the anaerobic digester 27 00:03:09,000 --> 00:03:15,000 lid so with this we're going to update it for the future with this starting of 28 00:03:15,000 --> 00:03:18,720 this phase so if we look at the plant just what's going on there right now 29 00:03:18,720 --> 00:03:25,200 it's a 21 mgd plant what's permitted through tcq and a peak factor of 46 mgd 30 00:03:25,200 --> 00:03:29,640 so that's the peak that's the most that it can take permitted wise our flows 31 00:03:29,640 --> 00:03:35,000 right now at 71 percent about 12 13 million gallons per day mr. Brown quick 32 00:03:35,000 --> 00:03:40,120 question yes mgd is a million gallons yes sir that's many gallons per day thank 33 00:03:40,120 --> 00:03:47,720 you yes sir you bet so the tcq talks about it's a 75 90 rule so it's 75 34 00:03:47,720 --> 00:03:53,000 percent we are required to start design on improvements at the plant so we can 35 00:03:53,000 --> 00:03:58,920 improve that capacity those permitted flows and at 90 percent we're need to be 36 00:03:58,920 --> 00:04:02,600 in construction for those so right now we're at 71 percent we're trying we're 37 00:04:02,600 --> 00:04:07,400 getting ahead of the curve one thing we're going to do is let's see here I'm 38 00:04:07,400 --> 00:04:11,120 gonna click that one thing we're going to do is a sand filter rehabilitation 39 00:04:11,120 --> 00:04:16,680 it's going to be replaced with what we call diamond cloth filters sit a new 40 00:04:16,680 --> 00:04:22,840 technology so with that improvement we'll be able to with there's four basins 41 00:04:22,840 --> 00:04:28,760 out there right now with sand filters with when we've improved this we'll be 42 00:04:28,760 --> 00:04:33,560 able to go to a capacity of 46 mgd with one of the filters out and that's per 43 00:04:33,560 --> 00:04:42,640 tcq so 23 mgd per basin with that we gain through the use of these diamond 44 00:04:42,640 --> 00:04:46,960 cloth filters with that we have like I said a capacity increase and also 45 00:04:46,960 --> 00:04:51,220 automatic cleaning and we're just preparing for a next phase these are 46 00:04:51,220 --> 00:04:54,620 things that we're going to do to be prepared for the future improvements as 47 00:04:54,620 --> 00:05:00,120 well so they'll coincide also we're going to change out the aeration diffusers 48 00:05:00,120 --> 00:05:05,480 right now they are 20 plus years old these go in aeration basins feed 49 00:05:05,480 --> 00:05:10,520 oxygen to the process one of the things the new diffusers they resist fouling 50 00:05:10,520 --> 00:05:15,140 they're made out of a membrane of rubber latex type material instead of the old 51 00:05:15,140 --> 00:05:21,800 ceramic so we have a longer lifespan of these membranes and also the O&M 52 00:05:21,800 --> 00:05:29,400 operation maintenance costs are greatly reduced also with this phase 1a we're 53 00:05:29,400 --> 00:05:36,880 going to replace aerum anaerobic digester lid so the both of the anaerobic 54 00:05:36,880 --> 00:05:44,200 digesters will be cleaned and with that a new gas lid will be built on site and 55 00:05:44,200 --> 00:05:50,120 installed with this lid we'll be able to capture the gas from the anaerobic 56 00:05:50,120 --> 00:05:55,720 digester and we're going to put it into the gas line and eventually hook up to 57 00:05:55,720 --> 00:06:04,200 a landfill project for Atmos gas so it would be reclaimed gas we went to 58 00:06:04,200 --> 00:06:10,760 competitive seal proposal and two actually two only two construction 59 00:06:10,760 --> 00:06:16,760 firms a bid on it and we selected Archer Western 13 million dollars five hundred 60 00:06:16,760 --> 00:06:22,000 nine two two one three hundred ninety five days of construction so we would 61 00:06:22,000 --> 00:06:26,320 like to recommend the entry contract with for the effluent filter aeration 62 00:06:26,320 --> 00:06:31,640 diffuser digesting improvements for the pecan Creek water reclamation plant with 63 00:06:31,640 --> 00:06:37,800 the Archer Western construction LLC now if there any questions be glad to answer 64 00:06:37,800 --> 00:06:42,360 also have a couple of gentlemen here a lot of technical expertise we'll start 65 00:06:42,360 --> 00:06:46,240 off here with mr. back thanks for that presentation just a quick question how 66 00:06:46,240 --> 00:06:51,680 much gas that's getting regenerated that you're gonna pipe over the atmosphere are 67 00:06:51,680 --> 00:06:55,520 we looking at what is it what kind of rate do you know exactly what you're 68 00:06:55,520 --> 00:07:03,240 capturing right now this is a rusty Willard he is a superintendent of a 69 00:07:03,240 --> 00:07:15,760 wastewater treatment okay a rusty go ahead you're flaring that off okay so 70 00:07:15,760 --> 00:07:22,640 now you'll be actually capturing it okay so it's the same amount but we're 71 00:07:22,640 --> 00:07:31,080 capturing now gotcha okay thank you I don't know if it's rusty and I had a 72 00:07:31,080 --> 00:07:35,720 question about the selection on the bids yes sir so you said you only had two 73 00:07:35,720 --> 00:07:39,760 bidders yes sir so what was your selection criteria the criteria was 74 00:07:39,760 --> 00:07:45,240 based on a lot of it had to first 30% personnel 30% I'll have to get you the 75 00:07:45,240 --> 00:07:49,280 numbers but I'll just give us a high level of the high level was that Archer 76 00:07:49,280 --> 00:07:54,160 Western was there already over there on site they're doing currently doing our 77 00:07:54,160 --> 00:07:59,640 detention facility and our pump station pecan Creek pump station there we've 78 00:07:59,640 --> 00:08:04,000 worked with them that that exact management those guys over there and 79 00:08:04,000 --> 00:08:07,960 we've had nothing but good good rapport with those guys and they have lots of 80 00:08:07,960 --> 00:08:13,800 experience in doing slant sand filters and plant work so they're mainly a group 81 00:08:13,800 --> 00:08:19,360 that does a lot of plant work okay so basically you've got a good working 82 00:08:19,360 --> 00:08:22,800 relationship with yes sir so what was the rest of the criteria you were kind 83 00:08:22,800 --> 00:08:27,560 of going criteria was on pricing they came in under bid on the main okay bid 84 00:08:27,560 --> 00:08:34,280 and then also on the so they were within 25,000 on the the alternate so 85 00:08:34,280 --> 00:08:38,720 Laurie Hill on the purchasing manager and it's an exhibit to list all the 86 00:08:38,720 --> 00:08:43,600 criteria and how they scored them but we had the key personnel was 20% quality 87 00:08:43,600 --> 00:08:47,840 reputation and ability to complete similar projects in on schedule and 88 00:08:47,840 --> 00:08:52,800 within budget was 30% detailed schedule and written plan was 15 their safety 89 00:08:52,800 --> 00:08:58,680 record was 5 and then the price was 30 okay I mean 25,000 on 13 million that's 90 00:08:58,680 --> 00:09:07,380 a push thank you we excuse me we usually get to see that because it's kind of 91 00:09:07,380 --> 00:09:14,040 hard to grasp I mean the confidence is sure is not questionable but we usually 92 00:09:14,040 --> 00:09:28,920 get to just look at it yeah it was okay I like my mistake that's okay any other 93 00:09:28,920 --> 00:09:33,840 questions I can help with are we gonna have any supply chain issues that you're 94 00:09:33,840 --> 00:09:40,240 aware of I can't guarantee that but they are we've had some questions come in on 95 00:09:40,240 --> 00:09:45,000 the pre-bid you know with questions like hey we need to jump on this and get some 96 00:09:45,000 --> 00:09:50,320 lead time so I think they're and I know that he has put in the lead time on 97 00:09:50,320 --> 00:09:54,240 there to get some equipment all right I know that's a problem it is just about 98 00:09:54,240 --> 00:09:57,720 everything we're doing a lot of things even was projects that are going on 99 00:09:57,720 --> 00:10:04,560 right now and can this postpone the next plant needing to be built can some of 100 00:10:04,560 --> 00:10:11,680 this we are that's one of we will have another project of course this is a this 101 00:10:11,680 --> 00:10:16,600 is a phased approach it's actually a solids handling and this is phase 1a of 102 00:10:16,600 --> 00:10:22,240 it the next phase of that will be coming up shortly will be a first first more 103 00:10:22,240 --> 00:10:26,640 solids handling for belt presses etc then there is going to be another project 104 00:10:26,640 --> 00:10:31,320 coming up with a head works in the plant which will help with expansion as well 105 00:10:31,320 --> 00:10:37,160 but this this is starts us off and will coincide with a technology coming forward 106 00:10:37,160 --> 00:10:46,640 okay thank you other questions go ahead so you're looking at this phase 1a it's 107 00:10:46,640 --> 00:10:51,800 13 and a half million dollars so what's your projection for the total refit of 108 00:10:51,800 --> 00:10:58,280 the plant over phase 1 a B and I presume phase 2 I mean just ballpark give it 109 00:10:58,280 --> 00:11:03,440 total first the total solids handling this is solids hanging project is around 110 00:11:03,440 --> 00:11:08,880 54 million dollars okay this is about a third of it down yes sir 111 00:11:08,880 --> 00:11:19,280 yeah I'm sorry that's also a small capacity upgrade for the plant yes we're 112 00:11:19,280 --> 00:11:24,600 currently working on a wastewater master plan and we'll be getting that to y'all 113 00:11:24,600 --> 00:11:29,040 the group soon and then also there's another project that will be coming on 114 00:11:29,040 --> 00:11:34,600 this is is to start off our capacity upgrades and certainly you're aware that 115 00:11:34,600 --> 00:11:39,440 this is going to be heading that way with all the growth so this is started 116 00:11:39,440 --> 00:11:45,840 off couldn't plan ahead we appreciate it thank you all right do we have a motion 117 00:11:45,840 --> 00:11:52,920 to approve item B motion so moved okay Lee moved Larry second all in favor say 118 00:11:52,920 --> 00:11:59,680 I think I motion carries thank you management reports 119 00:11:59,680 --> 00:12:06,780 madam chair and members of pub so a couple items on management report the 120 00:12:06,780 --> 00:12:11,060 first one is on the future agenda items so the things that we've listed on here 121 00:12:11,060 --> 00:12:14,440 is just to make you aware that we have budget presentations coming to you 122 00:12:14,440 --> 00:12:18,360 generally speaking we'll have a couple of those we'll go through the budget for 123 00:12:18,360 --> 00:12:22,400 each of the utilities the operating budget and the CIP budget as well and 124 00:12:22,400 --> 00:12:25,720 hopefully affords you the opportunity to have some good discussion on that and 125 00:12:25,720 --> 00:12:30,520 then around the 11th of July then we'll be asking you to to give a 126 00:12:30,520 --> 00:12:34,500 recommendation to the council on on those budgets and also any rate 127 00:12:34,500 --> 00:12:39,040 ordinances that may be applicable as as you may be aware we are required by 128 00:12:39,040 --> 00:12:44,640 state law to furnish the the the adopter the city manager proposed budget to the 129 00:12:44,640 --> 00:12:49,360 council by July 31st and so so that's kind of the time frame but our hope is 130 00:12:49,360 --> 00:12:53,200 that we'll have all the information to you well in advance that you can review 131 00:12:53,200 --> 00:12:56,400 it and we can go through those presentations it'll be a water 132 00:12:56,400 --> 00:13:01,360 wastewater solid waste electric and also customer service which is primarily 133 00:13:01,360 --> 00:13:05,960 funded by the utilities so that's what's kind of on your agenda over the next 134 00:13:05,960 --> 00:13:11,640 you know couple of couple of months and then on future agenda items we still 135 00:13:11,640 --> 00:13:16,640 have these two items we're still kind of actively working on those I can tell you 136 00:13:16,640 --> 00:13:20,000 that on the DME side we've kind of run into a little bit of hiccups here and 137 00:13:20,000 --> 00:13:23,060 trying to make sure that we get that information but but we are working on it 138 00:13:23,060 --> 00:13:26,740 hope to get that to you I've been also the sustainability committee before too 139 00:13:26,740 --> 00:13:30,800 long so with that happy to answer any questions that you may have on any of 140 00:13:30,800 --> 00:13:38,840 that any questions okay then concluding items does any board member wish to have 141 00:13:38,840 --> 00:13:45,400 something added to an agenda or have any public comments to be made looks like no 142 00:13:45,400 --> 00:13:49,400 all right then we're on to the work session receive a report hold a 143 00:13:49,400 --> 00:13:54,080 discussion and give staff direction regarding the audit project 0 to 5 energy 144 00:13:54,080 --> 00:14:00,560 portfolio management renewable energy offset goals and if we start going 145 00:14:00,560 --> 00:14:04,560 getting into an area where it's a competitive discussion we will go into 146 00:14:04,560 --> 00:14:12,800 closed session well after after after talking with the city attorney we we 147 00:14:12,800 --> 00:14:16,200 don't have the language in there but we oh we did to go into closed session but 148 00:14:16,200 --> 00:14:19,720 we don't think that we will so we'll we'll try to stay away from that but if 149 00:14:19,720 --> 00:14:22,700 but if something does come up we can always follow up through a legal status 150 00:14:22,700 --> 00:14:27,960 report for you but medicine Rorschach the city auditor is is on zoom she was 151 00:14:27,960 --> 00:14:30,840 unable to be here with us this morning but she'll be going through that 152 00:14:30,840 --> 00:14:35,080 presentation and Terry Nolte and myself are here to you know go into any 153 00:14:35,080 --> 00:14:40,540 questions that you may have that medicine is not able to respond to yes 154 00:14:40,540 --> 00:14:46,640 hello can y'all all hear me yes okay great awesome I'm sorry I couldn't be 155 00:14:46,640 --> 00:14:51,680 there I wish I could but it was unfortunate so as Tony said I'm 156 00:14:51,680 --> 00:14:55,560 Madison Rorschach the city auditor I'm gonna present our findings so let me 157 00:14:55,560 --> 00:15:04,240 just share my screen that way you all can see the presentation all right let's 158 00:15:04,240 --> 00:15:09,920 green I'm having a little bit of trouble hearing this presentation Madison he 159 00:15:09,920 --> 00:15:16,040 where he's having a little hard time hearing okay can you hear me better now 160 00:15:17,160 --> 00:15:26,680 okay was that yes or no sorry that's a yes okay great all right so this this 161 00:15:26,680 --> 00:15:30,840 report details our findings from the second phase of this project phase one 162 00:15:30,840 --> 00:15:35,280 one which we presented to you earlier covered energy portfolio transaction 163 00:15:35,280 --> 00:15:42,600 administration and so this one covers renewable energy offset goal so it as I 164 00:15:42,600 --> 00:15:46,040 said we've generally evaluated compliance cities renewable energy offset 165 00:15:46,040 --> 00:15:52,320 goal so historically city has issued have adopted a series of plans to achieve 166 00:15:52,320 --> 00:15:58,360 that have been aimed at achieving a 100% renewable energy goal of achieving a 167 00:15:58,360 --> 00:16:03,200 hundred percent renewable energy for all DME ratepayers achievement of which is 168 00:16:03,200 --> 00:16:07,760 primarily the responsibility of DMEs energy management organization through 169 00:16:07,760 --> 00:16:13,960 the management of the city's energy portfolio since the most recent plan the 170 00:16:13,960 --> 00:16:17,320 Denton renewable resource plan was adopted the city has increased its 171 00:16:17,320 --> 00:16:23,520 renewable energy production by almost 30% and so as part of this review we 172 00:16:23,520 --> 00:16:28,800 evaluated how the room renewable energy goal energy goal is progress is 173 00:16:28,800 --> 00:16:34,480 calculated monitored and reported so to begin we found that in general there's 174 00:16:34,480 --> 00:16:40,720 no formal definition in a city policy or internal DME procedure for how renewable 175 00:16:40,720 --> 00:16:44,080 energy off for how the renewable energy offset goal progress should be 176 00:16:44,080 --> 00:16:49,280 calculated in addition DME has not established any standard operating 177 00:16:49,280 --> 00:16:53,120 procedures outlining how the renewable energy offset goal should be monitored or 178 00:16:53,120 --> 00:16:58,200 reported and so we recommended that they should define how the renewable energy 179 00:16:58,200 --> 00:17:01,280 offset goal is calculated because it will help promote transparency and 180 00:17:01,280 --> 00:17:06,120 simplify the monitoring and reporting process for DME staff in addition we 181 00:17:06,120 --> 00:17:09,520 found that the Denton renewable resource plan should be updated to reflect 182 00:17:09,520 --> 00:17:15,880 expected load increases and regulatory changes that for the future and then 183 00:17:15,880 --> 00:17:20,920 finally we found that in the general electric industry renewable energy 184 00:17:20,920 --> 00:17:24,760 certificates are generally used to account for and make renewable energy 185 00:17:24,760 --> 00:17:30,440 power claims according to industry best practices institutions or companies 186 00:17:30,440 --> 00:17:35,440 should retire recs or which means to formally remove them from the market in 187 00:17:35,440 --> 00:17:39,080 order to ensure their renewable power usage claims are being properly 188 00:17:39,080 --> 00:17:44,280 supported that being said the city of Denton is not required to retire recs as 189 00:17:44,280 --> 00:17:48,760 part of the state's state of Texas's recs program and as a utility has 190 00:17:48,760 --> 00:17:52,640 different reasons for making renewable power usage claims than a company would 191 00:17:52,640 --> 00:17:57,960 for example and so for that reason we're recommending that the city evaluate the 192 00:17:57,960 --> 00:18:03,480 costs and benefits of retiring recs specifically retirement of recs would 193 00:18:03,480 --> 00:18:07,720 likely simplify the reporting process and increase transparency as annual 194 00:18:07,720 --> 00:18:16,760 retirements would be publicly reported by ERCOT okay and maybe this isn't time 195 00:18:16,760 --> 00:18:24,600 to ask but I don't understand retiring recs can you elaborate on that just a 196 00:18:24,600 --> 00:18:29,560 little bit because my understanding is once we purchased them they're in motion 197 00:18:29,560 --> 00:18:39,560 and to retire them did we did we not fully use them or yeah so the rec 198 00:18:39,560 --> 00:18:44,640 program is essentially accounting system that the state of Texas's 199 00:18:44,640 --> 00:18:54,120 uses to require most energy providers to support renewable energy production so 200 00:18:54,120 --> 00:19:01,320 most people in on in most market participants in ERCOT's market are 201 00:19:01,320 --> 00:19:06,560 required to purchase and retire which is basically to tell ERCOT hey we purchase 202 00:19:06,560 --> 00:19:12,040 these and we were saying we're using them and nobody else can use them so when 203 00:19:12,040 --> 00:19:15,240 you retire a rec it takes it out of circulation so that it can't be 204 00:19:15,240 --> 00:19:19,040 purchased by anybody else and they can't make a claim that that's it's been used 205 00:19:19,040 --> 00:19:26,400 by them but it's still a functional item that can be used by the person who 206 00:19:26,400 --> 00:19:33,400 purchased it it's so it's kind of Tony or Terry step in please if you would like 207 00:19:33,400 --> 00:19:38,320 to but it's it's kind of like a receipt that just says okay I'm sorry it's like 208 00:19:38,320 --> 00:19:42,320 it's like math to me I always had a hard time with that good morning at Terry 209 00:19:42,320 --> 00:19:49,920 and all thesis at DME so the rec program was established as part of the the 210 00:19:49,920 --> 00:19:55,400 competitive retail market in Texas we don't participate in the competitive 211 00:19:55,400 --> 00:20:01,040 retail market work what's called a non opt-in entity so we don't participate 212 00:20:01,040 --> 00:20:07,920 in competitive retail but in competitive retail markets they are required to have 213 00:20:07,920 --> 00:20:12,000 a certain percentage of the energy that they supply to their customers to be 214 00:20:12,000 --> 00:20:21,520 renewable and so the rec program is the mechanism that ERCOT uses to certify 215 00:20:21,520 --> 00:20:28,480 compliance with that renewable percentage so when a rec is awarded to a 216 00:20:28,480 --> 00:20:33,600 renewable resource for each megawatt of generation from that resource it's 217 00:20:33,600 --> 00:20:42,120 deposited into an account for that resource in our case they're they're 218 00:20:42,120 --> 00:20:49,600 into the generators resource account and then transferred to us as we take power 219 00:20:49,600 --> 00:20:56,920 off the resource and actually happens quarterly those are awarded by ERCOT 220 00:20:56,920 --> 00:21:05,600 based upon the actual generation of the renewable resource so the rec once it's 221 00:21:05,600 --> 00:21:12,520 in the once it's issued has a three-year life and for those competitive retailers 222 00:21:12,520 --> 00:21:17,360 because they have a compliance requirement every year they must retire 223 00:21:17,360 --> 00:21:23,520 them in the year or after the year that they serve the load that they served 224 00:21:23,520 --> 00:21:27,840 because we don't participate in that competitive retail market there is no 225 00:21:27,840 --> 00:21:35,160 such requirement for us to retire the rec so we have traditionally just let 226 00:21:35,160 --> 00:21:40,820 them expire at the end of three years rather than to make the actual 227 00:21:40,820 --> 00:21:45,080 retirement request so if they're retired does that mean we can't count them in as 228 00:21:45,080 --> 00:21:52,160 part of our energy offset we do count them as part of our energy or offset we 229 00:21:52,160 --> 00:21:56,880 just internally track them to make sure that in the year they were generated 230 00:21:56,880 --> 00:22:01,960 they're counted against the energy that we actually consumed in that year okay 231 00:22:01,960 --> 00:22:08,120 and mr. Beck what I'll what I'll what I'll say is too so in in this rewriter 232 00:22:08,120 --> 00:22:12,560 or this update to the dental renewable resource plan we do plan to make that a 233 00:22:12,560 --> 00:22:18,760 topic of discussion and so I want to be clear that DME has not sold any of the 234 00:22:18,760 --> 00:22:23,520 wrecks that it owns as part of our PPAs right we retain them and we hold them 235 00:22:23,520 --> 00:22:28,920 until they expire we do not actually go in and physically retire them in this 236 00:22:28,920 --> 00:22:32,200 account right and so I wanted to make sure that that you're clear about that 237 00:22:32,200 --> 00:22:38,440 what I will tell you is that there is a monetary value to those wrecks right as 238 00:22:38,440 --> 00:22:43,360 Terry has mentioned we are not required by Urquhart to retire them so in the 239 00:22:43,360 --> 00:22:47,120 event that we wanted to monetize them we could but you could be in a situation 240 00:22:47,120 --> 00:22:50,920 potentially where we've counted them towards our hundred percent goal and 241 00:22:50,920 --> 00:22:56,280 then we sell them to company X or entity X and then they also count them so 242 00:22:56,280 --> 00:23:00,200 there's a potential for double counting of those wrecks right and so that's part 243 00:23:00,200 --> 00:23:03,740 of the consideration is that you know there's a there's a monetary value to 244 00:23:03,740 --> 00:23:08,200 them that could potentially be beneficial to to our ratepayers and but 245 00:23:08,200 --> 00:23:13,120 once you retire them that you no longer have that opportunity so that's what 246 00:23:13,120 --> 00:23:16,320 we're saying is we're gonna bring that up bring that back for discussion and 247 00:23:16,320 --> 00:23:20,880 get direction and certainly if it's the policy makers decision for us to retire 248 00:23:20,880 --> 00:23:24,400 them and no longer do what we've been doing then we will certainly do that just 249 00:23:24,400 --> 00:23:29,720 understand that now you've taken potentially one more tool budgetary tool 250 00:23:29,720 --> 00:23:37,480 out of that toolbox for us the policy maker being being the PB and City 251 00:23:37,480 --> 00:23:50,200 Council ultimately I am presuming that an REC or REC is a renewable energy credit 252 00:23:50,200 --> 00:23:55,040 correct okay and that renewable energy credit is issued by Urquhart yes sir 253 00:23:55,040 --> 00:24:03,820 okay thank you yep okay go ahead Madison okay and I just want to say we're we 254 00:24:03,820 --> 00:24:07,120 brought this up as part of our audit report because in the industry most 255 00:24:07,120 --> 00:24:10,880 people are required to retire RECs in order to count them towards their 256 00:24:10,880 --> 00:24:15,960 renewable energy goal offset goal but that's not true for the city so I just 257 00:24:15,960 --> 00:24:19,840 wanted to make that clear but we also found the same costs and benefits that 258 00:24:19,840 --> 00:24:24,640 Tony just outlined and so that's why it's not our recommend it is not our 259 00:24:24,640 --> 00:24:29,340 recommendation at the city retire RECs only that we evaluate the cost and 260 00:24:29,340 --> 00:24:33,880 benefits because there are some transparency benefits and simplify 261 00:24:33,880 --> 00:24:38,400 potential simplification of the reporting process if we do retire RECs 262 00:24:38,400 --> 00:24:48,360 I'll share my thank you for that clarification all right okay so just 263 00:24:48,360 --> 00:24:52,080 moving on to the next slide due to kind of this lack of clarity in the policy 264 00:24:52,080 --> 00:24:57,160 about how the renewable energy offset goal progress is calculated we 265 00:24:57,160 --> 00:25:01,360 calculated it in three different ways and compared it to D&E's total load as 266 00:25:01,360 --> 00:25:07,760 shown in the figure on the slide so the direct generation line which you can see 267 00:25:07,760 --> 00:25:13,720 my mouse is this red line down here the bottom line it was based on all of the 268 00:25:13,720 --> 00:25:18,880 megawatt hours that the city paid its renewable PPA generators so that line 269 00:25:18,880 --> 00:25:24,520 captures only energy delivered to the grid are really purchased by us from 270 00:25:24,520 --> 00:25:29,240 pure renewable energy providers the second line the all RECs line which is 271 00:25:29,240 --> 00:25:35,320 this kind of gray line that is right here if you can see it was calculated 272 00:25:35,320 --> 00:25:39,560 based on the total number of RECs in the city's ERCOT REC account so that line 273 00:25:39,560 --> 00:25:44,000 captures all of the RECs transferred to the city from his PPA generators 274 00:25:44,000 --> 00:25:48,560 including RECs that the city did not actually receive physical energy from 275 00:25:48,560 --> 00:25:56,440 and then finally the D&E's calculation line which is this yellow line that's 276 00:25:56,440 --> 00:26:00,640 kind of you can see those follows the blue line which is the load and is a 277 00:26:00,640 --> 00:26:09,000 little bit above at the end is how D&E calculates its renewable energy offset 278 00:26:09,000 --> 00:26:14,440 is there a question yes there's another question Madison go ahead Lee so I'm 279 00:26:14,440 --> 00:26:19,560 assuming from this graph that this is where D&E is using the RECs is in these 280 00:26:19,560 --> 00:26:25,240 calculations and this is pretty much your only utilization of them well so so 281 00:26:25,240 --> 00:26:30,160 the the REC is is in essence the evidence of the renewable energy that 282 00:26:30,160 --> 00:26:34,960 was producing what we state is that you know for every one megawatt of renewable 283 00:26:34,960 --> 00:26:39,640 energy we get one REC right I think what what's important in this graph to 284 00:26:39,640 --> 00:26:43,400 understand is that that red line the actual generation the difference between 285 00:26:43,400 --> 00:26:48,480 the actual generation and the RECs and this was likely before before you came 286 00:26:48,480 --> 00:26:53,400 on but back in 2019 we had a discussion with the council that we have 30 287 00:26:53,400 --> 00:27:00,020 megawatts in a in a PPA where we where it's not tied to energy that we've 288 00:27:00,020 --> 00:27:05,360 contracted for right and so so we asked the council to allow us to count that 289 00:27:05,360 --> 00:27:10,120 towards our energy towards our renewable energy goal and in essence that 290 00:27:10,120 --> 00:27:14,160 difference between the generation and the REC is those 30 megawatts about 300 291 00:27:14,160 --> 00:27:21,440 megawatt hours right Terry a year that that we're counting currently because of 292 00:27:21,440 --> 00:27:25,240 that contract and in essence what we told the council is we can go out there 293 00:27:25,240 --> 00:27:30,080 and we can contract for it for direct energy but we've already paid for these 294 00:27:30,080 --> 00:27:34,560 30 megawatts of RECs right so that's about a two million dollar if I recall 295 00:27:34,560 --> 00:27:38,520 of additional cost that we would be incurring for rate payers as the 296 00:27:38,520 --> 00:27:42,760 council was good with us counting that towards our goal understanding that that 297 00:27:42,760 --> 00:27:48,760 contract is going to expire probably in 2023 and 2023 and so we're already 298 00:27:48,760 --> 00:27:54,760 actively looking to replace that with actual energy that's tied to RECs all 299 00:27:54,760 --> 00:28:00,040 right thank you yes sir go ahead 300 00:28:14,640 --> 00:28:24,000 Madison you may be on mute sorry about that as Tony mentioned some of the the 301 00:28:24,000 --> 00:28:28,880 yellow line accounts for PPA generators differently their generation so some of 302 00:28:28,880 --> 00:28:32,700 them are measuring direct generation from the red line and then some of them 303 00:28:32,700 --> 00:28:38,080 are measuring are measured using RECs from the city's account because some of 304 00:28:38,080 --> 00:28:41,080 them don't actually have generation direct generation associated with those 305 00:28:41,080 --> 00:28:48,360 RECs and so actually based on our assessment of DME's calculation it 306 00:28:48,360 --> 00:28:52,520 ensures that megawatt hours of electricity are not double counted and 307 00:28:52,520 --> 00:28:56,360 it is likely the most accurate method given this the structure of the city's 308 00:28:56,360 --> 00:29:00,960 current PPA agreements that Tony mentioned and then and including some 309 00:29:00,960 --> 00:29:04,240 potential data discrepancies that we noticed noted in our previous 310 00:29:04,240 --> 00:29:10,360 presentation to you all and so using DME's calculation practice to measure 311 00:29:10,360 --> 00:29:14,440 renewable offset the city's offset offset a hundred and one percent of their of 312 00:29:14,440 --> 00:29:21,140 its total load during calendar year 2021 so in summary we issued a total of four 313 00:29:21,140 --> 00:29:25,560 recommendations to DME all of which were concurred and based on their responses 314 00:29:25,560 --> 00:29:29,440 we believe the identified risk will be appropriately addressed and we're 315 00:29:29,440 --> 00:29:34,160 planning to conduct a follow-up review in 18 to 36 months in conjunction with 316 00:29:34,160 --> 00:29:37,120 the first phase of this audit project so we'll have one follow-up report at the 317 00:29:37,120 --> 00:29:48,600 end of this and that is the end of my presentation other questions all right 318 00:29:48,600 --> 00:29:56,160 thank you all right thank you so much well that is it do we have a motion to 319 00:29:56,160 --> 00:30:03,920 adjourn 931 oh very good thank you