 Alright, welcome everyone to the Sustainability Framework Advisory Committee.

00:00:07.440 --> 00:00:11.760
 We are meeting in the City Council Work Session Room at City Hall.

00:00:11.760 --> 00:00:16.400
 Today is February 25th and we are getting started at 1 of 2.

00:00:16.400 --> 00:00:22.240
 This is our first recording actually of our meeting and so we will need to speak up into

00:00:22.240 --> 00:00:25.040
 the mic to make sure that everyone can hear us.

00:00:25.040 --> 00:00:30.480
 We will go ahead, we do have a quorum, and we will go ahead and get started with items

00:00:30.480 --> 00:00:32.880
 for individual consideration.

00:00:32.880 --> 00:00:38.800
 A, consider approval of the December 17, 2021 minutes.

00:00:38.800 --> 00:00:46.720
 Did everyone get a chance to read over those, any changes?

00:00:46.720 --> 00:00:48.240
 Yes, Adam?

00:00:48.240 --> 00:00:55.920
 It says here, "Receive report, hold the discussion on the climate hazards and vulnerability assessment

00:00:55.920 --> 00:00:56.920
 tools."

00:00:56.920 --> 00:01:02.080
 We discussed it and it says, "Following discussion, there was no direction provided."

00:01:02.080 --> 00:01:09.360
 Maybe direction is a technical term, but I thought we did say something to the effect

00:01:09.360 --> 00:01:14.280
 of, "Well, let's keep pushing forward with the climate action plan," and that there was

00:01:14.280 --> 00:01:16.560
 in fact direction in that sense.

00:01:16.560 --> 00:01:21.840
 I'm just wondering, am I understanding this not in its technical sense?

00:01:21.840 --> 00:01:26.000
 It kind of makes it sound like we sat there and listened and just dropped it.

00:01:26.000 --> 00:01:27.000
 Right.

00:01:27.000 --> 00:01:28.240
 I feel like that's not what we did.

00:01:28.240 --> 00:01:29.240
 Okay.

00:01:29.240 --> 00:01:33.920
 Catherine, do you want to address that at all?

00:01:33.920 --> 00:01:40.720
 Is direction, is that an actual item for us to move forward on or does that mean there

00:01:40.720 --> 00:01:49.600
 wasn't any discussion or is there a better way to present that in the minutes?

00:01:49.600 --> 00:01:52.880
 I think that there's probably going to be a better way to present that in the minutes.

00:01:52.880 --> 00:02:00.080
 We can talk to Rosa about it, since it wasn't give feedback on climate hazards and not actual

00:02:00.080 --> 00:02:01.080
 direction.

00:02:01.080 --> 00:02:08.640
 I think that's why it's that term, but we can talk about how to better clarify that.

00:02:08.640 --> 00:02:12.200
 We'll just listen to it and say, "Okay."

00:02:12.200 --> 00:02:16.680
 There was a lot of discussion and it's still on the matrix.

00:02:16.680 --> 00:02:17.680
 Okay.

00:02:17.680 --> 00:02:19.680
 We know it's still moving forward.

00:02:19.680 --> 00:02:20.680
 Okay.

00:02:20.680 --> 00:02:27.520
 Should we make an amendment to these minutes to take out no direction and discussion to

00:02:27.520 --> 00:02:29.080
 keep moving forward?

00:02:29.080 --> 00:02:31.080
 I'm okay.

00:02:31.080 --> 00:02:35.080
 Is that a better term?

00:02:35.080 --> 00:02:37.560
 I feel like that's more accurate.

00:02:37.560 --> 00:02:38.560
 Okay.

00:02:38.560 --> 00:02:41.720
 In layman's terms, that's what happened, I feel like.

00:02:41.720 --> 00:02:42.720
 Okay.

00:02:42.720 --> 00:02:47.440
 Whoever wants to make a motion to approve, just approve without change?

00:02:47.440 --> 00:02:49.280
 I'll move to approve without change.

00:02:49.280 --> 00:02:50.280
 Okay.

00:02:50.280 --> 00:02:51.280
 Second.

00:02:51.280 --> 00:02:52.280
 All right.

00:02:52.280 --> 00:02:53.280
 Second.

00:02:53.280 --> 00:02:54.280
 All in favor?

00:02:54.280 --> 00:02:55.280
 Aye.

00:02:55.280 --> 00:02:56.280
 Aye.

00:02:56.280 --> 00:02:57.280
 All right.

00:02:57.280 --> 00:03:00.280
 Those minutes approve without one change.

00:03:00.280 --> 00:03:10.000
 We will move on to item B, stock report, update on SB 241 energy reporting.

00:03:10.000 --> 00:03:22.320
 JT couldn't be with us today, so if you have any questions, I will do my best.

00:03:22.320 --> 00:03:23.320
 What is this on?

00:03:23.320 --> 00:03:30.840
 This is the Senate Bill 241 local government energy reporting update.

00:03:30.840 --> 00:03:37.520
 We're required to report annually about our energy usage.

00:03:37.520 --> 00:03:53.280
 We saw a 3.6% reduction between 2019 and 2021 calendar year, with a 14% reduction in buildings.

00:03:53.280 --> 00:04:00.360
 Catherine, I did see that there was an agreement to reduce it by 5%.

00:04:00.360 --> 00:04:08.080
 The goal that the state sets is 5% annually for, it's usually a five-year term, to try

00:04:08.080 --> 00:04:12.720
 to get that 25%.

00:04:12.720 --> 00:04:20.760
 The reporting for the state is somewhat imperfect in that there's no weatherization normalization

00:04:20.760 --> 00:04:27.920
 included with it, and there's no accounting for new buildings coming online, buildings

00:04:27.920 --> 00:04:33.280
 going off, so 5% is the goal.

00:04:33.280 --> 00:04:37.840
 We've met the 5% some years, we don't some years.

00:04:37.840 --> 00:04:42.360
 Is there any repercussions for not meeting it, or is it just we just try harder next

00:04:42.360 --> 00:04:43.360
 time?

00:04:43.360 --> 00:04:44.360
 No.

00:04:44.360 --> 00:04:45.360
 No repercussions for not meeting it.

00:04:45.360 --> 00:04:48.360
 They did make a big push over the last few years to get everybody reporting, because

00:04:48.360 --> 00:04:51.240
 most people weren't even reporting.

00:04:51.240 --> 00:04:59.200
 We've been doing it since it started way back in the old days, but this is I think the fourth

00:04:59.200 --> 00:05:02.160
 iteration of the Senate bill to do that.

00:05:02.160 --> 00:05:04.800
 Adam, and then Brian.

00:05:04.800 --> 00:05:08.920
 Quick question, it's okay if you don't know it, it says this is a response to being a

00:05:08.920 --> 00:05:10.640
 non-attainment area.

00:05:10.640 --> 00:05:13.000
 I read that to mean air quality.

00:05:13.000 --> 00:05:14.000
 Correct.

00:05:14.000 --> 00:05:21.460
 It's only for jurisdictions that are located within non-attainment areas of the state.

00:05:21.460 --> 00:05:22.460
 Why?

00:05:22.460 --> 00:05:26.120
 It seems like a non sequitur to me to say you're in a non-attainment area and then target

00:05:26.120 --> 00:05:32.400
 the electricity sector when that's not driving our primary non-compliance with air quality,

00:05:32.400 --> 00:05:33.400
 I would say.

00:05:33.400 --> 00:05:38.400
 It would be better if they said you should have a 5% reduction in vehicle traffic, wouldn't

00:05:38.400 --> 00:05:39.400
 it?

00:05:39.400 --> 00:05:42.400
 Or am I misunderstanding the cause and effect of this?

00:05:42.400 --> 00:05:45.800
 That would make sense.

00:05:45.800 --> 00:05:50.000
 This is just how the state decided to tackle building energy usage.

00:05:50.000 --> 00:06:02.920
 It was noted that the 14% decrease in building electricity use, it was kind of noted that

00:06:02.920 --> 00:06:04.720
 that might have been due to COVID.

00:06:04.720 --> 00:06:11.160
 Can you account why the 70% increase in street and traffic lights might have occurred?

00:06:11.160 --> 00:06:19.000
 The street traffic is a very small portion, so the 70% doesn't account for a very many

00:06:19.000 --> 00:06:25.920
 kilowatt hours, but mostly that was new installations of lights and then re-identifying some from

00:06:25.920 --> 00:06:30.560
 the other sector as street or traffic lights.

00:06:30.560 --> 00:06:45.680
 Ed? Yeah, I was just curious as to whether or not the increased number of solar systems

00:06:45.680 --> 00:06:53.520
 in the city, photovoltaic systems, were taken into account in this reduction.

00:06:53.520 --> 00:07:01.600
 No, this is only for municipal consumption, so only municipal facilities are tracked with

00:07:01.600 --> 00:07:02.600
 this report.

00:07:02.600 --> 00:07:09.760
 Okay, well the only way I was making that connection was there seemed to be some sort

00:07:09.760 --> 00:07:21.640
 of relationship with this, with the electricity put back into the grid from residential and

00:07:21.640 --> 00:07:33.640
 commercial installations, and if, how, I don't see how that could have, how that could possibly

00:07:33.640 --> 00:07:41.440
 maybe influence the volume of electricity that's either being consumed or saved.

00:07:41.440 --> 00:07:44.040
 Does that make sense?

00:07:44.040 --> 00:07:49.760
 I understand where you're going with that, it does, this report doesn't take into account

00:07:49.760 --> 00:07:58.600
 that we are 100% renewable either, so it's strictly the usage for our facilities in trying

00:07:58.600 --> 00:08:03.600
 to reduce the usage.

00:08:03.600 --> 00:08:10.000
 So I would think that if the municipal buildings had solar on them, right, then it would account

00:08:10.000 --> 00:08:13.680
 for that if it was direct with the municipal buildings.

00:08:13.680 --> 00:08:14.680
 Right.

00:08:14.680 --> 00:08:15.680
 Yeah.

00:08:15.680 --> 00:08:18.360
 We would see the demand for the kilowatt hour reduction there.

00:08:18.360 --> 00:08:20.440
 So this is strictly municipal operations.

00:08:20.440 --> 00:08:21.440
 Yeah.

00:08:21.440 --> 00:08:22.440
 Yes, sir.

00:08:22.440 --> 00:08:23.440
 Mr. Stevens?

00:08:23.440 --> 00:08:24.440
 Yes.

00:08:24.440 --> 00:08:25.440
 Back to the streetlights.

00:08:25.440 --> 00:08:26.440
 Yes.

00:08:26.440 --> 00:08:36.280
 Is there any way to extrapolate out new lights in comparison to the base period of 2019?

00:08:36.280 --> 00:08:43.440
 Is there any way to determine if the initiatives that were put in place in 2019 to reduce the

00:08:43.440 --> 00:08:50.200
 kilowatt usage, was that effective at all, because looking at it like this with the 71%

00:08:50.200 --> 00:08:56.880
 increase, it could skew the overall bottom numbers if progress has been made.

00:08:56.880 --> 00:09:05.640
 So for example, the 3.6% that we're looking at as the achievement could possibly be higher

00:09:05.640 --> 00:09:13.880
 if we were able to separate the lights from the measured lights that established the 2019

00:09:13.880 --> 00:09:14.880
 data.

00:09:14.880 --> 00:09:15.880
 Does that make sense?

00:09:15.880 --> 00:09:16.880
 It does.

00:09:16.880 --> 00:09:24.800
 And we do have the total count of streetlights and traffic signals.

00:09:24.800 --> 00:09:32.360
 And as we change out to LED lights, we may be adding more lights, but they aren't using

00:09:32.360 --> 00:09:33.360
 as much energy.

00:09:33.360 --> 00:09:38.120
 So there's some trade-offs there, so we can look at the counts year over year and see

00:09:38.120 --> 00:09:40.120
 what that looks like.

00:09:40.120 --> 00:09:47.240
 We've been using primarily LED traffic signals for many years.

00:09:47.240 --> 00:09:52.360
 So I think a little bit of this could be some of those areas where Coast Guard and THU are

00:09:52.360 --> 00:09:56.720
 coming in with lighting, and we may not have as much direct control over what they're installing,

00:09:56.720 --> 00:10:00.720
 because we also have to account for those that are within our city limits.

00:10:00.720 --> 00:10:05.520
 But we can get the count of the streetlights, and we can look at that.

00:10:05.520 --> 00:10:12.240
 This seems like it'll improve what we're targeting to get to if we had relative data to look

00:10:12.240 --> 00:10:13.240
 at.

00:10:13.240 --> 00:10:18.240
 The usage on the lights, the streetlights and the traffic signals is still low.

00:10:18.240 --> 00:10:24.240
 Most of them are not metered, they're just assigned a value annually, because there's

00:10:24.240 --> 00:10:29.240
 not enough consumption to go out and have the meter and read it every month.

00:10:29.240 --> 00:10:33.240
 So we just get a count and an average.

00:10:33.240 --> 00:10:38.240
 A last question on the lights, because that's a good point, thank you for pointing that.

00:10:38.240 --> 00:10:44.240
 On the streetlights, is that also neighborhood residential or is it just main streets?

00:10:44.240 --> 00:10:45.240
 It's all.

00:10:45.240 --> 00:10:46.240
 All of them.

00:10:46.240 --> 00:10:52.240
 So some of that could account for a lot of the growth that we've seen all through the

00:10:52.240 --> 00:10:53.240
 city.

00:10:53.240 --> 00:10:54.240
 Okay.

00:10:54.240 --> 00:10:55.240
 All right.

00:10:55.240 --> 00:10:56.240
 Thank you.

00:10:56.240 --> 00:10:57.240
 Everybody okay on this item?

00:10:57.240 --> 00:10:58.240
 Good?

00:10:58.240 --> 00:10:59.240
 Okay.

00:10:59.240 --> 00:11:00.240
 All right.

00:11:00.240 --> 00:11:05.240
 So we will move on to, we're going to go ahead and talk about the Matrix.

00:11:05.240 --> 00:11:12.240
 We missed the Matrix last night, so we have a pretty full Matrix here.

00:11:12.240 --> 00:11:17.240
 Got some presentations put that we're going to plan on for March.

00:11:17.240 --> 00:11:22.240
 A couple that we'll take care of today.

00:11:22.240 --> 00:11:29.240
 Parks will be coming back probably in May after the growing season to talk about IPM

00:11:29.240 --> 00:11:33.240
 and then we'll probably bring the Urban Forester back at the same time.

00:11:33.240 --> 00:11:37.240
 I like that kind of view, park centric meeting.

00:11:37.240 --> 00:11:38.240
 Okay.

00:11:38.240 --> 00:11:44.240
 And since we have this here, if there's anything we want to add to the Matrix, we could go

00:11:44.240 --> 00:11:48.240
 ahead and talk about that today at this point.

00:11:48.240 --> 00:11:49.240
 Talk about it right now?

00:11:49.240 --> 00:11:50.240
 Okay.

00:11:50.240 --> 00:11:51.240
 Yeah, we can talk about it right now.

00:11:51.240 --> 00:11:52.240
 Okay.

00:11:52.240 --> 00:11:57.240
 Has everybody had a chance to review the Matrix and Adam?

00:11:57.240 --> 00:12:03.240
 This isn't an addition, but maybe just a contextual point on the update climate action plan I

00:12:03.240 --> 00:12:04.240
 see on here.

00:12:04.240 --> 00:12:09.240
 It would be, I think it would be really good if that could happen in the context of the

00:12:09.240 --> 00:12:10.240
 2040 plan.

00:12:10.240 --> 00:12:16.240
 I think it's really important to think about how all these plans are integrating, mobility

00:12:16.240 --> 00:12:18.240
 plan and all of this.

00:12:18.240 --> 00:12:21.240
 I don't know, that's not a new item.

00:12:21.240 --> 00:12:26.240
 It's just to say it'd be neat if that conversation could be self-consciously set in that context.

00:12:26.240 --> 00:12:30.240
 I think that might be the most useful for city council.

00:12:30.240 --> 00:12:31.240
 Okay.

00:12:31.240 --> 00:12:32.240
 Ed?

00:12:32.240 --> 00:12:33.240
 Pardon me.

00:12:33.240 --> 00:12:46.240
 Yeah, along the same lines, I would like to see more information about what the committee

00:12:46.240 --> 00:12:56.240
 is doing and what the city is doing in terms of net zero by 2050 on the Simply Sustainable

00:12:56.240 --> 00:12:57.240
 webpage.

00:12:57.240 --> 00:13:05.240
 There's really not much information there about what's going on with climate change.

00:13:05.240 --> 00:13:13.240
 I also think a simple tutorial on that website as to what climate change is and what can

00:13:13.240 --> 00:13:16.240
 be done about it would be advantageous.

00:13:16.240 --> 00:13:23.240
 Seeing as how we discussed earlier how important the educational aspect of this is so that

00:13:23.240 --> 00:13:30.240
 the public understands what the city is doing.

00:13:30.240 --> 00:13:40.240
 I think the debt and sustainable schools, it's either a Facebook page or webpage.

00:13:40.240 --> 00:13:44.240
 The schools should mention their solar installations.

00:13:44.240 --> 00:13:53.240
 They should mention their non-diesel propane fuel bus fleet, and they as well should have

00:13:53.240 --> 00:13:59.240
 an explanation of climate change.

00:13:59.240 --> 00:14:11.240
 I second Adam's idea of coordination and inter-departmental communications regarding

00:14:11.240 --> 00:14:20.240
 what we're doing and plugging that in with current plan drafts such as the 2040, which

00:14:20.240 --> 00:14:26.240
 makes absolutely no mention of net zero by 2050.

00:14:26.240 --> 00:14:43.240
 When the Parks Department was working on the IPM, we used Austin's plan as a template and

00:14:43.240 --> 00:14:48.240
 worked on putting the plan together for Denton.

00:14:48.240 --> 00:14:53.240
 Our philosophy being we're going to make it better than Austin's.

00:14:53.240 --> 00:15:03.240
 And I would suggest perhaps a similar approach with some of these educational initiatives

00:15:03.240 --> 00:15:05.240
 that I was just talking about.

00:15:05.240 --> 00:15:11.240
 Check out the Austin sustainability page, which I'm sure you have.

00:15:11.240 --> 00:15:15.240
 The public outreach is absolutely remarkable.

00:15:15.240 --> 00:15:21.240
 So I'd like to see discussion and action on that very near future.

00:15:21.240 --> 00:15:23.240
 Thank you.

00:15:23.240 --> 00:15:26.240
 So, Katherine, let me simple about what I think I just heard.

00:15:26.240 --> 00:15:32.240
 Maybe on the matrix of presentation on the sustainability and sustainable schools website

00:15:32.240 --> 00:15:38.240
 for us, and then that way we can have a meeting and all of us, we can all give you ideas on

00:15:38.240 --> 00:15:45.240
 public outreach, how we think it should change and maybe be better.

00:15:45.240 --> 00:15:47.240
 So website updates.

00:15:47.240 --> 00:15:51.240
 Website update and public outreach.

00:15:51.240 --> 00:15:55.240
 Is that good, Ed, for that item?

00:15:55.240 --> 00:16:01.240
 Yeah, I mean, I would think that it could probably be something done in a very timely

00:16:01.240 --> 00:16:10.240
 manner because there are certainly models out there that we can learn from.

00:16:10.240 --> 00:16:17.240
 In addition, I'd like to request a review of our current development code as it relates to

00:16:17.240 --> 00:16:25.240
 our parking minimums as well as on-street parking.

00:16:25.240 --> 00:16:27.240
 And then just a point of clarification.

00:16:27.240 --> 00:16:33.240
 I'm not sure how much it matters, but I believe that I had requested the item on here under

00:16:33.240 --> 00:16:40.240
 the tree code update, Ed, if you can remember correctly.

00:16:40.240 --> 00:16:43.240
 I'm not sure how much, so that's a stickler.

00:16:43.240 --> 00:16:44.240
 So the last item?

00:16:44.240 --> 00:16:48.240
 Yes, I believe so, if I'm remembering from December correctly.

00:16:48.240 --> 00:16:51.240
 Okay.

00:16:51.240 --> 00:16:57.240
 Yeah, so I thought at one time we were going to get a full kind of update brought about

00:16:57.240 --> 00:17:05.240
 the sustainability codes or how that can be intertwined.

00:17:05.240 --> 00:17:11.240
 So that would be a good place to put that and make sure we have the parking minimums.

00:17:11.240 --> 00:17:17.240
 I think there's a section here for blood covers and then tree codes.

00:17:17.240 --> 00:17:24.240
 So there's a lot of code discussions that we can have on how that integrates with sustainability.

00:17:24.240 --> 00:17:30.240
 I don't know if you want to do those individually or if we just want to have an overall development.

00:17:30.240 --> 00:17:37.240
 It might be best served if I have an overall discussion with someone from Scott's group.

00:17:37.240 --> 00:17:40.240
 Maybe even get Scott in over.

00:17:40.240 --> 00:17:43.240
 Okay.

00:17:43.240 --> 00:17:48.240
 Anyone else want to add to or see something you want to expand on?

00:17:48.240 --> 00:17:53.240
 Could we potentially add things at the end of our discussion today if other things come up?

00:17:53.240 --> 00:17:59.240
 Let's go ahead, since we have this item open now, we'll go ahead and add things to the matrix.

00:17:59.240 --> 00:18:04.240
 And we could table this and then bring it back if things come up?

00:18:04.240 --> 00:18:05.240
 Through the meeting?

00:18:05.240 --> 00:18:07.240
 Okay.

00:18:07.240 --> 00:18:09.240
 All right.

00:18:09.240 --> 00:18:10.240
 So we will do that.

00:18:10.240 --> 00:18:11.240
 We will table this.

00:18:11.240 --> 00:18:18.240
 And if something comes up through the meeting, we can reopen the item and add to the matrix at the end of the meeting.

00:18:18.240 --> 00:18:19.240
 Sounds good.

00:18:19.240 --> 00:18:21.240
 Thank you for that, Catherine.

00:18:21.240 --> 00:18:31.240
 We'll go ahead and move on to item C, receive an update, hold a discussion about the status of the landfill gas project.

00:18:31.240 --> 00:18:32.240
 Brian, welcome.

00:18:32.240 --> 00:18:34.240
 Thank you very much.

00:18:34.240 --> 00:18:38.240
 For those of you who do not know me or we haven't seen each other in a while, my name is Brian Berner.

00:18:38.240 --> 00:18:41.240
 I am the solid waste director for the city of Hennepin.

00:18:41.240 --> 00:18:48.240
 And I do appreciate the opportunity to come and talk a little bit about our landfill as well as our landfill gas collection system

00:18:48.240 --> 00:18:51.240
 and the exciting project that we're working on right now.

00:18:51.240 --> 00:18:58.240
 So just a little bit of education on the front end before we talk about the project on the back end here.

00:18:58.240 --> 00:19:07.240
 City of Denton has had a landfill at the 1527 South Mayhill site since about 1980.

00:19:07.240 --> 00:19:08.240
 Yes, ma'am?

00:19:08.240 --> 00:19:09.240
 Do you have a presentation?

00:19:09.240 --> 00:19:10.240
 I do not.

00:19:10.240 --> 00:19:11.240
 We're just going to talk a little bit.

00:19:11.240 --> 00:19:14.240
 And part of it has to do with the fact that we're still in negotiation with the company.

00:19:14.240 --> 00:19:15.240
 Okay.

00:19:15.240 --> 00:19:20.240
 And there's some things that we can talk about here, but I don't need to have, you know.

00:19:20.240 --> 00:19:28.240
 Can we click on the agenda sheet so that is online so that individuals who are watching this can see?

00:19:28.240 --> 00:19:35.240
 Just have that on their screen.

00:19:35.240 --> 00:19:36.240
 Thank you.

00:19:36.240 --> 00:19:37.240
 You're welcome.

00:19:37.240 --> 00:19:39.240
 So, okay.

00:19:39.240 --> 00:19:44.240
 As I stated earlier, the landfill that we currently have at 1527 South Mayhill,

00:19:44.240 --> 00:19:51.240
 we're collecting garbage for residents and commercial customers as well as outside waste in about 1980.

00:19:51.240 --> 00:19:57.240
 And we operate as a regional landfill, so we've never been for the exclusive use for the City of Denton.

00:19:57.240 --> 00:20:00.240
 We recognize that while we're there to serve the citizens of Denton,

00:20:00.240 --> 00:20:05.240
 the resident or the outside waste sort of acts as a little bit of a seed corn.

00:20:05.240 --> 00:20:11.240
 It provides us with some buffer and some rate reduction in helping us to operate the facility.

00:20:11.240 --> 00:20:15.240
 Originally, the original footprint was about 25 acres.

00:20:15.240 --> 00:20:18.240
 We've expanded the landfill twice.

00:20:18.240 --> 00:20:27.240
 The first time with permit 1590B, which took us from 25 acres to about 154 acres of actual fill space,

00:20:27.240 --> 00:20:29.240
 not including the aerial height.

00:20:29.240 --> 00:20:35.240
 And then here last August, we were awarded a permit through the TCEQ under 1590B,

00:20:35.240 --> 00:20:45.240
 so the second modification permit, for our total lateral space to be about 258 acres.

00:20:45.240 --> 00:20:55.240
 Again, this takes our life of the total disposal capacity right now at our current waste amount that we're taking in

00:20:55.240 --> 00:21:02.240
 about anywhere from about 50 to 60 years at our current volume and current recycling rates and things of that nature.

00:21:02.240 --> 00:21:07.240
 We are probably one of the top five growing areas in the region.

00:21:07.240 --> 00:21:14.240
 The DFW landfill waste management facility was in Louisville shut down fully about eight months ago,

00:21:14.240 --> 00:21:17.240
 and we are seeing a tremendous amount of waste coming into our facility.

00:21:17.240 --> 00:21:20.240
 So again, as part of our comprehensive solid waste management strategy,

00:21:20.240 --> 00:21:27.240
 we're going to be working to put into effect different programs that will help us increase diversion,

00:21:27.240 --> 00:21:30.240
 decrease the amount of material that's going in.

00:21:30.240 --> 00:21:35.240
 And while that's superfluous to what we're talking about, it's directly related to what we're talking about here too.

00:21:35.240 --> 00:21:42.240
 So again, we've got to recognize that we've got a lot of moving parts recognizing what we're doing here at the facility.

00:21:42.240 --> 00:21:47.240
 When we talk about landfill gas, it's not something that we put in the landfill,

00:21:47.240 --> 00:21:50.240
 but it results from the things that we put in the landfill.

00:21:50.240 --> 00:21:57.240
 Basically, the landfill, somebody described to me one time as a big compost pile, for lack of a better term.

00:21:57.240 --> 00:22:03.240
 We put organic materials in there, and through an anaerobic digestion process, we get methane,

00:22:03.240 --> 00:22:11.240
 we get a little bit of CO2, oxygen, nitrogen, what's called balanced gas, and then some other gases along with it.

00:22:11.240 --> 00:22:15.240
 So about 50% of what we get is methane, and 50% is this other stuff.

00:22:15.240 --> 00:22:21.240
 When we talk about the organic material, it's the residential trash that's in our carts at the curb side.

00:22:21.240 --> 00:22:26.240
 So anything that we get that can rot that goes in there, yard waste that may not be diverted,

00:22:26.240 --> 00:22:31.240
 construction demolition debris that may be able to decay.

00:22:31.240 --> 00:22:39.240
 So things like wood, paper backing on sheetrock, just any of that material that goes in there, that can decay,

00:22:39.240 --> 00:22:45.240
 and that is really what contributes to the management and the production of the landfill gas.

00:22:45.240 --> 00:22:51.240
 We are required by federal and state law to manage this gas. We can't just let it vent to the atmosphere.

00:22:51.240 --> 00:22:59.240
 First and foremost, it's not prudent, but secondarily, it actually has a benefit if you manage it correctly.

00:22:59.240 --> 00:23:06.240
 In our permit, volume four, it requires us to create what's called a landfill gas collection and control system.

00:23:06.240 --> 00:23:13.240
 So currently we have about 150 wells in the existing landfill, all connected by laterals.

00:23:13.240 --> 00:23:22.240
 The landfill gas is collected under vacuum, and then currently right now we are flaring the gas to the atmosphere.

00:23:22.240 --> 00:23:34.240
 By flaring the gas, it's the least emission intensive way to manage that gas for the complete destruction of the methane.

00:23:34.240 --> 00:23:39.240
 We're required to monitor. So right now we have 22 probes that surround the existing landfill.

00:23:39.240 --> 00:23:49.240
 As we go into the new permitted area, we're going to add approximately, let's see, 13, 14 more, so that we monitor these on a quarterly basis.

00:23:49.240 --> 00:23:54.240
 We're required to keep the methane levels down below five percent. Most of the time they read zero.

00:23:54.240 --> 00:24:00.240
 Sometimes they peak at one or two, but most of the time they're non-detectable in these areas.

00:24:00.240 --> 00:24:08.240
 Also, as we expand the landfill, some of the existing probes and wells that are in our growth area will be removed

00:24:08.240 --> 00:24:13.240
 and we'll put in additional wells to ensure that we completely encompass and surround the landfills,

00:24:13.240 --> 00:24:20.240
 so we know what's happening upstream, downstream. We know if there's problems and we can respond accordingly.

00:24:20.240 --> 00:24:33.240
 Brian, you just said we're going to add 13 to 14 more. Did you mean more wells or more flaring in your statement just a minute ago?

00:24:33.240 --> 00:24:39.240
 No probes to monitor. Currently we have one flare and it is sized to manage the existing landfill.

00:24:39.240 --> 00:24:48.240
 As we move into the new part that we've permitted, we may or may not be required to source an additional flare,

00:24:48.240 --> 00:24:56.240
 and that has to go back to the project. I hate to bait you that way, but give me just a minute to get to that point.

00:24:56.240 --> 00:25:07.240
 We are required to maintain this gas collection control system throughout the entire life of the site,

00:25:07.240 --> 00:25:13.240
 and actually our permit requires us to maintain it and monitor it 30 years beyond the point that we close it down.

00:25:13.240 --> 00:25:19.240
 Reason being is if you look at the growth curves and the way that natural gas or the landfill gas is produced,

00:25:19.240 --> 00:25:28.240
 it takes about 30 years for it to actually start producing significant amounts of gas due to the anaerobic digestion process.

00:25:28.240 --> 00:25:37.240
 It's without air, so it moves a whole lot slower, and basically we maximize the amount of material we put in at some point,

00:25:37.240 --> 00:25:45.240
 and then as we trail off, we still have to account for that gas that continues to be produced from the material we put in there after we close down.

00:25:45.240 --> 00:25:53.240
 So it may be 30 years, but again we have to have assurances from the state, from the TCEQ, that we've reached a level

00:25:53.240 --> 00:26:00.240
 that we're no longer producing gas so we can shut the system down. See, 30 years plus 50 years, that's at least 80 years.

00:26:00.240 --> 00:26:06.240
 I'm not going to be around at that time. If any of y'all are, y'all can check on the system. I'd appreciate that.

00:26:06.240 --> 00:26:10.240
 I'm not going to be anywhere, I'm not going to be walking face to face the earth in 80 years.

00:26:10.240 --> 00:26:18.240
 Anyway, there's a lot better things that we can do with this landfill gas than just burn it.

00:26:18.240 --> 00:26:29.240
 In 2008, we entered into a partnership with a company called DTE, where we actually set a generation unit out there.

00:26:29.240 --> 00:26:37.240
 A big 12-cylinder cat engine looked up to a gen set, spun it up, and was producing what was called renewable energy,

00:26:37.240 --> 00:26:42.240
 renewable electricity for about 1,500 homes in the city of Dent.

00:26:42.240 --> 00:26:48.240
 When that started, that's when natural gas, if y'all may remember, was about $10, $12 an MCF.

00:26:48.240 --> 00:26:51.240
 It was very expensive and it made a whole lot of sense.

00:26:51.240 --> 00:26:58.240
 As natural gas prices dropped, it actually became the highest price point of electricity in the city of Dent's portfolio.

00:26:58.240 --> 00:27:11.240
 As such, it was costing city of Denton ratepayers in excess of about a million dollars a year just to run that and produce energy from that plant.

00:27:11.240 --> 00:27:17.240
 As a result, in 2002, DNE actually bought the DTE plant and shut it down,

00:27:17.240 --> 00:27:21.240
 which is why we're required to burn all the gas now under a mitigation plan.

00:27:21.240 --> 00:27:26.240
 But recognizing that there are better ways to manage that material.

00:27:26.240 --> 00:27:32.240
 What we've decided to do, we actually had a consultant come in, look at our generation, look at our different options,

00:27:32.240 --> 00:27:41.240
 and we're currently in the process of negotiating with the company to come in and create what's called high BTU gas.

00:27:41.240 --> 00:27:45.240
 As I stated earlier, landfill gas is about 50% methane.

00:27:45.240 --> 00:27:52.240
 When you look at what Atmos has flowing in their line, it's about 99.98% methane.

00:27:52.240 --> 00:27:58.240
 So what we're proposing to do is actually take the landfill gas plus gases generated from our wastewater treatment plant,

00:27:58.240 --> 00:28:07.240
 the concrete facilities, anaerobic digesters, pull that gas off and actually treat it and concentrate it down to pipeline grade,

00:28:07.240 --> 00:28:13.240
 removing the balanced gas, removing the oxygen, removing other things that you don't want in the natural gas,

00:28:13.240 --> 00:28:25.240
 and feeding it to the local Atmos lines and basically providing additional sources of gas for people to use in their homes and businesses here in the City of Dent.

00:28:25.240 --> 00:28:32.240
 Once that molecule gets into the pipeline, it's really no different than any other molecule of gas that's flowing up and down that pipeline.

00:28:32.240 --> 00:28:36.240
 Benefit to the City of Dent, first and foremost, we're not flaring it.

00:28:36.240 --> 00:28:43.240
 Ideally, any time we've got the flare running, it means it's dollars out of our pocket, it's dollars out of our contractor's pocket.

00:28:43.240 --> 00:28:49.240
 So it shuts the flare down immediately, puts all that natural gas into the pipeline,

00:28:49.240 --> 00:28:56.240
 and it's used to create hot water, to cook, and then to do the other things that need to happen.

00:28:56.240 --> 00:29:10.240
 Additionally, there are green energy credits to what's called RINs and RECs that will actually pay us to manage this gas in such a way that it doesn't have to be produced at a natural gas wellhead.

00:29:10.240 --> 00:29:17.240
 So again, it becomes a cleaner and greener option to provide natural gas into the system.

00:29:17.240 --> 00:29:24.240
 As I said earlier, we are currently negotiating with a third-party contractor to come in and construct and operate this plant.

00:29:24.240 --> 00:29:32.240
 We've prepared the RFP, we've talked with the company, we actually had four respondents step up and want to do this for the City of Dent.

00:29:32.240 --> 00:29:40.240
 So we've selected the highest and best value consultant that we feel will bring benefit to the City of Dent.

00:29:40.240 --> 00:29:50.240
 What we're hoping to do is within the next 90 days actually come before the PEB and the Council with a contract to memorialize this contract and the pricing structure.

00:29:50.240 --> 00:30:04.240
 Following the acceptance of the contract, we'll spend the next 12 to 18 months permitting, designing, constructing, getting the pipeline to induct it into the Atmos facility, designing where the most appropriate place is.

00:30:04.240 --> 00:30:13.240
 And then in 18 months have that facility up and running and actually benefit in producing what's called renewable natural gas into the system.

00:30:13.240 --> 00:30:18.240
 So again, it's an exciting process, it's an exciting project that's on the ground.

00:30:18.240 --> 00:30:22.240
 There's considerable economic benefit to the City of Dent.

00:30:22.240 --> 00:30:39.240
 We're looking forward to helping not only support some rate relief for our customers, solid waste customers with it, but also help fund some of the exciting programs we're planning on implementing as a result of our comprehensive solid waste management strategy.

00:30:39.240 --> 00:30:47.240
 So with that, I'd be glad to answer any questions you might have about our natural gas system or the solid waste system in general.

00:30:47.240 --> 00:30:53.240
 Well, I have a few comments. Anybody else want to give up?

00:30:53.240 --> 00:30:57.240
 We'll just start. Do you have one? No. Okay. Adam?

00:30:57.240 --> 00:31:09.240
 Forgive me if I missed this. What percent would you say of material that goes in landfill is organic that decays and produces this gas?

00:31:09.240 --> 00:31:13.240
 That's a really good question.

00:31:13.240 --> 00:31:17.240
 We're currently trying to figure out exactly what that number is.

00:31:17.240 --> 00:31:23.240
 As part of the development of our style comprehensive solid waste management strategy, we did do a couple of waste characterization.

00:31:23.240 --> 00:31:28.240
 So we took basically your garbage bin off and we went through it and weighed things out.

00:31:28.240 --> 00:31:36.240
 Currently about 45% of what's thrown away is considered organic material.

00:31:36.240 --> 00:31:42.240
 So it's food waste, it's yard waste, it's wood, things of that nature.

00:31:42.240 --> 00:31:52.240
 So again, there's significant opportunities in not only the residential but in the commercial sector to divert additional organic material out of the landfill.

00:31:52.240 --> 00:31:59.240
 And it's probably one of our biggest and little hanging fruit from an impact standpoint and diversionary standpoint.

00:31:59.240 --> 00:32:02.240
 Can I follow up on that? That's where I was going with this.

00:32:02.240 --> 00:32:08.240
 Let's say we get operational with this and we're making renewable natural gas, which is a beneficial thing.

00:32:08.240 --> 00:32:14.240
 How do you weigh that benefit against the benefit of diverting this out of the landfill and doing something else with it?

00:32:14.240 --> 00:32:23.240
 In other words, you say to people in Denton, should you put your compostables in the brown bin or just chuck it in the green one because we're making gas out of it?

00:32:23.240 --> 00:32:26.240
 Well, and we win from both sides.

00:32:26.240 --> 00:32:32.240
 But at the end of the day, when you look at best practices that are across the nation, across the world,

00:32:32.240 --> 00:32:47.240
 regardless of what you're doing in the city of Denton, we would only be able to divert probably 73% of that 45% because the rest is things that are adhering or absorbed into other paper or other options.

00:32:47.240 --> 00:32:50.240
 So there will always be an organic sector going in.

00:32:50.240 --> 00:32:56.240
 So we may flatten that curve a little earlier than we thought we would, but we will always have organic material.

00:32:56.240 --> 00:33:09.240
 And again, we've had the landfill here since 1980. So we're really only realizing the gas from the material that we put in there in about 1990, 1995.

00:33:09.240 --> 00:33:15.240
 So we still have 20 years of stuff we've been putting in there before we realized that gas.

00:33:15.240 --> 00:33:21.240
 So we're kind of chasing our tail. We're lagging from the gas production standpoint.

00:33:21.240 --> 00:33:27.240
 So we're well within our contract defined terms, our ability to sell gas and to use this.

00:33:27.240 --> 00:33:37.240
 So by starting to divert that organic material now, it will have minimal impact on what this renewable energy plant, high BTU plant, will produce for the city of Denton.

00:33:37.240 --> 00:33:41.240
 Thank you.

00:33:41.240 --> 00:33:42.240
 Go ahead.

00:33:42.240 --> 00:33:47.240
 From a cost perspective, you mentioned that it has cost benefit to the city.

00:33:47.240 --> 00:33:48.240
 Correct.

00:33:48.240 --> 00:33:53.240
 Which could look like consumer reduction in their energy fields.

00:33:53.240 --> 00:33:55.240
 In their solid waste rates.

00:33:55.240 --> 00:33:56.240
 Solid waste rates.

00:33:56.240 --> 00:33:57.240
 Correct.

00:33:57.240 --> 00:33:59.240
 Okay.

00:33:59.240 --> 00:34:01.240
 That leads into my question even deeper.

00:34:01.240 --> 00:34:09.240
 The amount of the projected amount of gas that will be put into at most as an example.

00:34:09.240 --> 00:34:15.240
 Have you calculated out what that dollar benefit would look like coming back to us?

00:34:15.240 --> 00:34:30.240
 I know I'm probably stretching it somewhat, but with the annual cost of inflation, cost of operations, will there come a point where their net gain will be gone away and we end up with another million dollar cost to operate that system?

00:34:30.240 --> 00:34:31.240
 Does that make sense?

00:34:31.240 --> 00:34:35.240
 That is a very fair question and that was the first question we always asked going through this.

00:34:35.240 --> 00:34:39.240
 At what point in time is the city actually on the hook for paying something versus receiving it?

00:34:39.240 --> 00:34:40.240
 Correct.

00:34:40.240 --> 00:34:47.240
 And I can't share the prospectus with you right now because again we're still in contract negotiations and that's still going back and forth.

00:34:47.240 --> 00:34:59.240
 But based on our calculations, we're still net positive, including inflation and growth and everything else for at least the next 20 years.

00:34:59.240 --> 00:35:00.240
 Thank you.

00:35:00.240 --> 00:35:02.240
 Did you have any questions?

00:35:02.240 --> 00:35:21.240
 Yeah, I'm sort of conflicted about this from a long range point, I guess you could say, rather than short range.

00:35:21.240 --> 00:35:34.240
 Whether methane is fossil, methane, or whether it's renewable, it still has the global warming capacity, I assume.

00:35:34.240 --> 00:35:35.240
 Is that correct?

00:35:35.240 --> 00:35:36.240
 Yes.

00:35:36.240 --> 00:35:51.240
 Okay, so we know that methane leakage is a huge problem.

00:35:51.240 --> 00:36:15.240
 We're underestimated and new reports have come out, I'm sure you're aware of, that show massive methane leakage and how this is really reducing our chances to get climate change under control before it's too late.

00:36:15.240 --> 00:36:34.240
 Well, I don't understand in that respect, and just reading now about the health hazards of combustion of methane, ethanol, gas, whatever, in stoves.

00:36:34.240 --> 00:36:39.240
 And I'm sure you're aware of these reports that are coming out too.

00:36:39.240 --> 00:36:58.240
 And I assume that you're aware of the movement in many cities to revamp their building codes to keep natural gas connections out of new buildings.

00:36:58.240 --> 00:37:10.240
 And there are now grants available to retrofit existing gas heated buildings with electric heat pumps, et cetera, et cetera.

00:37:10.240 --> 00:37:35.240
 So I guess what I'm getting to is, does this really fit in with a net zero 2050 plan, and it just seems like a very limited investment, meaning the time that it's going to have to make money to the city.

00:37:35.240 --> 00:37:48.240
 In that we know that it's a system that needs to change for the benefit of the future.

00:37:48.240 --> 00:38:12.240
 And I have, like I say, conflicting feelings about this because in one way I can see it's a benefit to the city financially. We're not flaring anymore, yet we are prolonging a system that needs to change.

00:38:12.240 --> 00:38:24.240
 There's no question about that. We've got to do whatever we can to stop using methane except for essential purposes.

00:38:24.240 --> 00:38:42.240
 And in an area like this where we have so many options available to us, other things we can explore, which I don't know if you've explored yet, and that's one of my questions.

00:38:42.240 --> 00:38:50.240
 Instead of just jumping into this and making it sound like it's a done deal, I think we need to examine it more.

00:38:50.240 --> 00:38:57.240
 I think we need to look at it at a comprehensive waste management plan. Is that plan finished?

00:38:57.240 --> 00:39:05.240
 We're in the final stages. There is an actual presentation of PUB and Council on Monday and Tuesday regarding our final goals and metrics we'll be using.

00:39:05.240 --> 00:39:14.240
 And then we'll be buttoning it up and then starting the development of the administrative portion and then the implementation plan for the different projects.

00:39:14.240 --> 00:39:29.240
 I assume then that what you're talking about with this methane plan is something that is recommended in the waste management plan?

00:39:29.240 --> 00:39:38.240
 Regardless of whether it's recommended or not, it's required. If you have a type 1 landfill and state attaches, you are producing methane.

00:39:38.240 --> 00:39:48.240
 And your permit from a federal standpoint requires you to manage it. So we're going to have methane and we either burn it, run it in an engine, or we put it in a pipeline.

00:39:48.240 --> 00:39:59.240
 That's really our three options that then we have to manage it. So again, it's not an either/or or we can just turn a key and we're not going to produce methane anymore.

00:39:59.240 --> 00:40:09.240
 We have it and we have to manage it. Long term, I think that I understand and appreciate the fact that we're moving towards electrification.

00:40:09.240 --> 00:40:17.240
 But we still have a large amount of housing stock plus industrial sources in the city of Denton that will be using methane for quite a while.

00:40:17.240 --> 00:40:27.240
 If we can locally provide that methane, we're not looking at transporting at long distances. We're not looking at fresh fossil fuel sources.

00:40:27.240 --> 00:40:40.240
 It's a beneficial piece that helps us get to this point. Until we can get everybody converted over at some point in time that we're not needed anymore, then we can start flaring again.

00:40:40.240 --> 00:40:52.240
 Hopefully we're on the downside of the curve at that point. Through partnerships with local universities and other innovators, we can figure out other alternatives, things to do with methane.

00:40:52.240 --> 00:40:59.240
 But right now, heat and combustion is really the big thing that we can do with methane.

00:40:59.240 --> 00:41:22.240
 Have you thought about expanding the aerobic composting? Not the anaerobic, but the regular composting program?

00:41:22.240 --> 00:41:29.240
 We have. With food waste and methane producing materials.

00:41:29.240 --> 00:41:41.240
 We're looking at that also as part of the whole comprehensive management strategy. Part of our issue with doing just regular composting and windrowing is that we're space restricted.

00:41:41.240 --> 00:41:52.240
 So we're going to maximize that, looking at doing some anaerobic also to help make that process just a little bit quicker.

00:41:52.240 --> 00:41:56.240
 But again, with the anaerobic digesters, you still get methane on the back end.

00:41:56.240 --> 00:42:08.240
 There's also studies out there right now that if you're not maintaining your windrows correctly, you actually have significant methane emissions from a traditional aerobic type of composting facility.

00:42:08.240 --> 00:42:14.240
 There's a lot of moving variables, and we're looking at this from a holistic standpoint.

00:42:14.240 --> 00:42:24.240
 We're trying to keep an open mind and look at these things from a cost benefit standpoint, recognizing sustainability is an important part of that.

00:42:24.240 --> 00:42:41.240
 Okay, I know at some point, I was just looking at here, I had asked for a further report on a plan of composting for the city.

00:42:41.240 --> 00:42:48.240
 I think that's when you were sitting on the PUB that you had asked for something like that, and we were including that in the carbon subliminal strategy.

00:42:48.240 --> 00:43:02.240
 Okay, well those are my feelings about it, and I understand where you're coming from, and I just feel that it's a very short sighted decision.

00:43:02.240 --> 00:43:11.240
 And I have a problem with short term solutions for long term problems.

00:43:11.240 --> 00:43:17.240
 I really don't think that the long term is being looked at here.

00:43:17.240 --> 00:43:26.240
 I'm not saying that what you're doing is wrong or anything, I just feel like there needs to be more looking at this.

00:43:26.240 --> 00:43:28.240
 Thank you.

00:43:28.240 --> 00:43:35.240
 Hi, so I have been taking some notes, so bear with me while I try to go back through them.

00:43:35.240 --> 00:43:43.240
 One, you said there's the three options, and since this is the Sustainability Framework Committee, our concern is environment and emissions.

00:43:43.240 --> 00:44:00.240
 So have we looked at, I know one of the reasons we went from the electricity to flaring is because we were told that it would capture more methane and reduce those greenhouse emissions

00:44:00.240 --> 00:44:09.240
 because of the energy that we were using was that the machine was old and there was leakage and stuff, so we made that choice.

00:44:09.240 --> 00:44:15.240
 It wasn't the methane, we were still having complete methane destruction with the engine and the flare or the flare.

00:44:15.240 --> 00:44:18.240
 The issue is with the flare, we don't have any NOx emissions.

00:44:18.240 --> 00:44:30.240
 With the engine we were running, we were having significant NOx emissions, which again is the, I forget the exact term, but again it directly impacts our non-attainment.

00:44:30.240 --> 00:44:38.240
 So again, by removing the engine offline, we actually improved our air quality suit for lack of a better term.

00:44:38.240 --> 00:44:48.240
 Piggybacking on that, moving to this new gas capture, does it do the same thing as burning?

00:44:48.240 --> 00:45:03.240
 Because what I want to see is the data that this is going to not only be financial, but be better for our environment in a way that it helps our air quality, since we're in non-attainment.

00:45:03.240 --> 00:45:10.240
 Can you, I think that's what this committee would like to see, everything sounds good.

00:45:10.240 --> 00:45:24.240
 I know that I'd much rather not flare if we don't have to, but if moving to this new system is not going to be as good for our air quality or good for our city,

00:45:24.240 --> 00:45:33.240
 then that's the kind of, if it's going to have more leakage, those are the kind of things that I'm looking to see when you come back with this.

00:45:33.240 --> 00:45:43.240
 Well, and again, just quick, in talking molecule for molecule, right now we're burning everything that we're pulling out of the landfill.

00:45:43.240 --> 00:45:52.240
 So again, it destroys the methane, produces water, carbon dioxide, and some other trace chemicals.

00:45:52.240 --> 00:46:01.240
 When we have this plant up and running, the flare goes away, and that methane then goes to your house.

00:46:01.240 --> 00:46:06.240
 Currently you're cooking anyway. You've got a hot water heater running, if you've got natural gas, okay?

00:46:06.240 --> 00:46:10.240
 So what it's doing basically is, it's almost a net zero.

00:46:10.240 --> 00:46:20.240
 We're not increasing any emissions on the users end, but reducing the amount of burning and emissions that are happening at the landfill through the flare.

00:46:20.240 --> 00:46:27.240
 So we're seeing a reduction in what's at the flare because we're not using as much coming through the pipeline.

00:46:27.240 --> 00:46:36.240
 Okay. Well, just general overall, that would be good for us to see in a presentation, that data and those emissions.

00:46:36.240 --> 00:46:44.240
 For me, anyway, I'd like to see that in fracking versus this way,

00:46:44.240 --> 00:46:51.240
 because there's several different ways to get gas, and renewable natural gas is what we're calling this.

00:46:51.240 --> 00:46:53.240
 Correct.

00:46:53.240 --> 00:47:05.240
 Which is great if it works and it is better for our environment than the way that it's currently being received.

00:47:05.240 --> 00:47:10.240
 So are we going to sell it and use it?

00:47:10.240 --> 00:47:15.240
 I know that when we were producing our own electricity in our pie chart,

00:47:15.240 --> 00:47:23.240
 that I think it was 4% or 3% went directly to our residential usage.

00:47:23.240 --> 00:47:25.240
 We were able to capture that.

00:47:25.240 --> 00:47:38.240
 Is there a way when we move to this new utility that we'll be able to capture that direct benefit to the residents?

00:47:38.240 --> 00:47:43.240
 Or is it just going to all go in and we just won't know?

00:47:43.240 --> 00:47:52.240
 No, we'll be able to capture how much methane that we were actually putting in the pipeline,

00:47:52.240 --> 00:48:03.240
 and then we'll be able to, from an economic standpoint, show what the benefit is to the rate payers in the city of Denton at that point, if that makes sense.

00:48:03.240 --> 00:48:12.240
 It does, but for me, I'm an Atmos rate payer, and so I'm just confused about how that's going to translate to my electric bill.

00:48:12.240 --> 00:48:13.240
 It won't.

00:48:13.240 --> 00:48:14.240
 Okay.

00:48:14.240 --> 00:48:17.240
 But what it will transfer to is your solid waste bill.

00:48:17.240 --> 00:48:25.240
 You may pay the exact same, if you're at Atmos and you get your natural gas from Atmos, let's say your bill's $100.

00:48:25.240 --> 00:48:28.240
 $100 makes the math.

00:48:28.240 --> 00:48:33.240
 It's easy. It's $100.

00:48:33.240 --> 00:48:34.240
 I'm just going to throw this out.

00:48:34.240 --> 00:48:42.240
 A million dollars a year net from the sale of this natural gas to the city.

00:48:42.240 --> 00:48:54.240
 We could actually realize potentially a dollar or two rate reduction or cost avoidance to your solid waste bill as a result of this on a monthly basis.

00:48:54.240 --> 00:49:00.240
 So again, that's where you'll see the reduction is at your solid waste bill level, not at your natural gas level,

00:49:00.240 --> 00:49:07.240
 because you will always pay stock spot market price on what that natural gas is that's coming to your home,

00:49:07.240 --> 00:49:13.240
 regardless of whether it's renewable natural gas, regardless of where it comes from in the country.

00:49:13.240 --> 00:49:20.240
 As long as it gets into that pipeline, you're paying what the spot market price is on an average basis.

00:49:20.240 --> 00:49:23.240
 Now, to cure that just a little bit further,

00:49:23.240 --> 00:49:28.240
 we still have a few vehicles on our fleet that run off natural gas.

00:49:28.240 --> 00:49:35.240
 So we could use this gas in our fleet to power some of these natural gas vehicles,

00:49:35.240 --> 00:49:44.240
 but from a value standpoint, we can actually put it in the pipeline and then pull it out 100 foot down the pipeline

00:49:44.240 --> 00:49:53.240
 and buy it at a cheaper rate from a cost savings standpoint than it would be to buy it directly from before we put it into the pipeline.

00:49:53.240 --> 00:49:56.240
 And that goes back to the RINs and the RECs and the green energy credits.

00:49:56.240 --> 00:50:10.240
 We're getting almost 30, in today's market, close to $30 in MMBTU for every molecule that we put in or every amount that we put in.

00:50:10.240 --> 00:50:13.240
 We're losing that money if we take it directly from the plant.

00:50:13.240 --> 00:50:19.240
 But if we buy it in the pipeline, we're paying what the spot market price is, which is $2 or $3.

00:50:19.240 --> 00:50:25.240
 So again, we're making money even though we're pulling it out almost immediately when we put it back in.

00:50:25.240 --> 00:50:32.240
 So that's part of the valuation that we have to consider as we're going through the cost allocation on this.

00:50:32.240 --> 00:50:39.240
 But there will be a way, because I know for us, we go by the greenhouse gas emissions that it's reported.

00:50:39.240 --> 00:50:44.240
 We get that report, and solid waste is pretty high.

00:50:44.240 --> 00:50:46.240
 Yes, they are.

00:50:46.240 --> 00:50:57.240
 But again, as we continue to report back on this, that report is exclusive of any efforts we make to destroy those emissions.

00:50:57.240 --> 00:51:00.240
 So it's just what we've produced, not what we've controlled.

00:51:00.240 --> 00:51:05.240
 Again, if you put that control in there, it drops us way down to the bottom of the list.

00:51:05.240 --> 00:51:15.240
 So all of this is, I just bring that up because I'd like to see how all that translates into the data that we're going to see.

00:51:15.240 --> 00:51:22.240
 I think it would be very beneficial for us and the public, too, as we talk about it,

00:51:22.240 --> 00:51:29.240
 how these greenhouse gases and emissions and what they are, what they were, and what they will be.

00:51:29.240 --> 00:51:35.240
 It will be helpful for us to put that in a perspective.

00:51:35.240 --> 00:51:37.240
 I know you have a question, but just a quick follow-up.

00:51:37.240 --> 00:51:41.240
 So your statement that you just made, speaking of the statement that you just made,

00:51:41.240 --> 00:51:48.240
 that we examined our municipal and community emissions really early at the start of this committee's process.

00:51:48.240 --> 00:51:54.240
 Are you stating that the emission records that were in that were not reflective of what you controlled,

00:51:54.240 --> 00:51:56.240
 but as you said, what you were producing?

00:51:56.240 --> 00:52:04.240
 Yeah, the way that the model works is it looks at the amount of waste that it brings in.

00:52:04.240 --> 00:52:09.240
 And correct me if I'm wrong, but it applies a standard reduction.

00:52:09.240 --> 00:52:13.240
 You've got this much waste, this is how much methane it can or could produce.

00:52:13.240 --> 00:52:19.240
 It does not take into account the controls that we have once we collect it,

00:52:19.240 --> 00:52:24.240
 so the destruction that we do through the flare, through the engine, through this process.

00:52:24.240 --> 00:52:30.240
 So are you stating that we were looking at perhaps not entirely comprehensive data

00:52:30.240 --> 00:52:33.240
 than what you may be able to provide in a future presentation?

00:52:33.240 --> 00:52:36.240
 That is correct. Excuse me, in my opinion, that is correct.

00:52:36.240 --> 00:52:42.240
 Okay, so off of the question she's raised in perhaps a future presentation,

00:52:42.240 --> 00:52:47.240
 could you bring us that data that's a little more reflective of what you say is actually being emitted

00:52:47.240 --> 00:52:51.240
 outside of the production of what you're actually able to control?

00:52:51.240 --> 00:52:54.240
 I think we could probably do that.

00:52:54.240 --> 00:52:55.240
 Go ahead, Adam.

00:52:55.240 --> 00:52:58.240
 I think on Keely's first question, I really appreciated that,

00:52:58.240 --> 00:53:01.240
 and I thought I was going here, but we didn't get there.

00:53:01.240 --> 00:53:10.240
 One of the very first things you said was that about 50% of the gas is methane and 50% is other stuff.

00:53:10.240 --> 00:53:11.240
 Didn't you say that?

00:53:11.240 --> 00:53:15.240
 In landfill gas, correct.

00:53:15.240 --> 00:53:19.240
 Then you talked about pipeline gas being almost pure methane.

00:53:19.240 --> 00:53:20.240
 Correct.

00:53:20.240 --> 00:53:23.240
 What I thought we were driving at, and I think it would be good to see,

00:53:23.240 --> 00:53:26.240
 is what happens to the other 50% of this stuff?

00:53:26.240 --> 00:53:30.240
 Because you said the flare has gone entirely, but they don't want that in the pipeline.

00:53:30.240 --> 00:53:31.240
 Correct.

00:53:31.240 --> 00:53:33.240
 Where does it go?

00:53:33.240 --> 00:53:39.240
 Things like the oxygen, carbon dioxide, things that can be emitted under the permit,

00:53:39.240 --> 00:53:41.240
 because again, this is a permanent process.

00:53:41.240 --> 00:53:45.240
 It's not just somebody coming in and setting up by the state and be allowed to do this.

00:53:45.240 --> 00:53:52.240
 There will be some releases, there are potentials of carbon sequestration of some of the gas,

00:53:52.240 --> 00:53:59.240
 but a lot of what we're seeing, there will be what we call scrubbing media.

00:53:59.240 --> 00:54:05.240
 Again, the ballast gas or the rest of the gas will flow through.

00:54:05.240 --> 00:54:13.240
 It will be absorbed onto different types of beads, and that material will react, will be neutralized,

00:54:13.240 --> 00:54:18.240
 and then that will go for disposal or treatment in some way, shape, or form.

00:54:18.240 --> 00:54:22.240
 There are different ways that we manage that other half of the material.

00:54:22.240 --> 00:54:26.240
 That's a good point, I will say. That's a good question.

00:54:26.240 --> 00:54:27.240
 Can I?

00:54:27.240 --> 00:54:29.240
 Yes, please. Go ahead, Mr. President.

00:54:29.240 --> 00:54:36.240
 In agreement with the -- I need to see a total comprehensive plan to in essence put our blessing on it.

00:54:36.240 --> 00:54:41.240
 If we're going to advise on this, there's a lot more information that we need.

00:54:41.240 --> 00:54:49.240
 And then I really would like to come alongside what Ed is saying is that how does it impact the overall master plan,

00:54:49.240 --> 00:54:54.240
 greenhouse gas reduction and so forth, the 2050 plan.

00:54:54.240 --> 00:55:02.240
 I'd like to see how does it integrate into that, how does it help us achieve that goal, if we can ask that.

00:55:02.240 --> 00:55:09.240
 Yeah, and I think that's things that we tend to bring forward in future greenhouse gas reports to the city.

00:55:09.240 --> 00:55:14.240
 We can show what we're reducing, net result of the reductions here,

00:55:14.240 --> 00:55:21.240
 and just get a much bigger and more comprehensive evaluation on what the total production is.

00:55:21.240 --> 00:55:27.240
 But to clarify, you watched your material before the approval of the facility, right?

00:55:27.240 --> 00:55:28.240
 Yes.

00:55:28.240 --> 00:55:32.240
 Well, again, part of that -- and again, we're asked to advise.

00:55:32.240 --> 00:55:38.240
 The purpose of this committee is to advise the council and put our blessing on our yay or nay.

00:55:38.240 --> 00:55:47.240
 Yes, I have to see that before I can agree or vote or whatever to say yay or nay.

00:55:47.240 --> 00:55:56.240
 And awesome plan, it sounds like, but it sounds like I need to see it documented and presented accordingly.

00:55:56.240 --> 00:56:06.240
 And then just an overall renewable gas percentage, what that would look like for our community.

00:56:06.240 --> 00:56:11.240
 So like what we get now, and then you get this process started,

00:56:11.240 --> 00:56:17.240
 what percent of our community's usage would now be renewable usage versus non.

00:56:17.240 --> 00:56:20.240
 I think that might be something I'm interested in.

00:56:20.240 --> 00:56:35.240
 Yeah, so really how much of the current pipeline gas would be supplanted by the induction of all renewable natural gas into the system.

00:56:35.240 --> 00:56:44.240
 Yeah, and I think that -- are we going to -- do we need to bring this up at the end when we reopen the matrix maybe?

00:56:44.240 --> 00:56:48.240
 Or is this good for now as like a direction to you?

00:56:48.240 --> 00:56:49.240
 I think it's good for now.

00:56:49.240 --> 00:56:50.240
 Okay, it is.

00:56:50.240 --> 00:56:52.240
 I'm not even captured in the picture.

00:56:52.240 --> 00:56:53.240
 Okay.

00:56:53.240 --> 00:56:54.240
 Okay.

00:56:54.240 --> 00:56:55.240
 All right.

00:56:55.240 --> 00:56:56.240
 Thank you all very much for your time.

00:56:56.240 --> 00:57:01.240
 Thank you for your time.

00:57:01.240 --> 00:57:12.240
 We will move on to Item B, Receiver Report, call to discussion on the Department and Capital Project Sidewalk Work Plan with Nathan George,

00:57:12.240 --> 00:57:17.240
 the City Senior Planner, Bicycle, Pedestrian, and ADA Coordinator.

00:57:17.240 --> 00:57:18.240
 I don't believe we've met yet.

00:57:18.240 --> 00:57:19.240
 Welcome.

00:57:19.240 --> 00:57:20.240
 Thank you.

00:57:20.240 --> 00:57:21.240
 Nice to meet you.

00:57:21.240 --> 00:57:24.240
 No, I don't believe we've met yet.

00:57:24.240 --> 00:57:29.240
 So yeah, I'm Nathan George, the City's new Mike Ped and ADA Coordinator.

00:57:29.240 --> 00:57:31.240
 I sit in the Capital Projects Division.

00:57:31.240 --> 00:57:41.240
 I heard you guys wanted to hear a little bit more about where I am and what I do because you've seen several different iterations of the position that I hold over the years.

00:57:41.240 --> 00:57:45.240
 So I'll be happy to entertain any questions you have towards the end.

00:57:45.240 --> 00:57:48.240
 I guess I can give a brief introduction of myself.

00:57:48.240 --> 00:57:51.240
 So I joined the city in July of last year.

00:57:51.240 --> 00:57:56.240
 I come from the Washington, D.C. area, previously working in consulting roles.

00:57:56.240 --> 00:58:11.240
 So I had been doing similar work, bike ped and ADA type work, with a consulting firm based out of Baltimore and doing a lot of designing facilities and supporting communities like the City of Denton with implementing those facilities,

00:58:11.240 --> 00:58:19.240
 either through planning or design phases, helping them get funding for those outside funding opportunities to accelerate programs.

00:58:19.240 --> 00:58:22.240
 So I did a lot of the same kind of work that I'm doing here today.

00:58:22.240 --> 00:58:33.240
 I just happen to now be admitted as a staff member at the City of Denton and looking forward to continuing to do the work that I have been doing the last seven months and delivering projects.

00:58:33.240 --> 00:58:38.240
 And hopefully you'll start to see some of my work in the ground very soon.

00:58:38.240 --> 00:58:41.240
 Are you familiar with our sustainability plan?

00:58:41.240 --> 00:58:45.240
 At a high level. I'm not very familiar with it yet.

00:58:45.240 --> 00:58:49.240
 I have had a lot of other stuff on my plate, but I'm sure we'll take a look at it.

00:58:49.240 --> 00:58:53.240
 And today I'm here to talk with you about the sidewalk work plan.

00:58:53.240 --> 00:58:56.240
 So this is one of, I'll call it one of our capital programs.

00:58:56.240 --> 00:58:59.240
 It's effectively, we have a lot of different capital programs.

00:58:59.240 --> 00:59:03.240
 Some of you on this side of the room refer to the mobility plan.

00:59:03.240 --> 00:59:10.240
 And then once we have those plans, we put together work plans that help us deliver those capital programs, in this case sidewalks.

00:59:10.240 --> 00:59:13.240
 We have a separate program for bicycle lanes or bicycle facilities.

00:59:13.240 --> 00:59:19.240
 Sometimes there's a little overlap between those bike and ped components of facilities that we implement around the city.

00:59:19.240 --> 00:59:24.240
 And then of course we have a lot of other programs that you see like waterline projects down by the gray.

00:59:24.240 --> 00:59:27.240
 There's a lot of other work the capital projects does.

00:59:27.240 --> 00:59:29.240
 So I'm going to walk you through the sidewalk work plan.

00:59:29.240 --> 00:59:33.240
 This is basically, it's a presentation that I've given now.

00:59:33.240 --> 00:59:40.240
 I think this is the fifth time to different various bodies, council, mobility committee, and so forth.

00:59:40.240 --> 00:59:52.240
 So I'll give you the presentation. It'll be a little bit different because we were presenting this more as a guiding sort of framework to help reshape how we're going to deliver sidewalk projects under our work plan.

00:59:52.240 --> 00:59:58.240
 So you'll see a little bit of that background and a little bit of information about how we're going to deliver the projects moving forward.

00:59:58.240 --> 01:00:07.240
 And the next critical step is to take a lot of this information out to the public and start talking about specific projects because this information is helpful background information.

01:00:07.240 --> 01:00:12.240
 But we still have to put a lot of additional application in place to use the information.

01:00:12.240 --> 01:00:14.240
 So I'll walk you through the presentation.

01:00:14.240 --> 01:00:19.240
 Hyperlink was included in AIS or the agenda information sheet.

01:00:19.240 --> 01:00:22.240
 So anybody who wants to can go and take a look at this on.

01:00:22.240 --> 01:00:24.240
 It's actually hosted online.

01:00:24.240 --> 01:00:31.240
 So all the information that I'm presenting today is available for members of the committee or the public to take a look at their lecture.

01:00:31.240 --> 01:00:39.240
 So the sidewalk work plan is a plan that helps us guide where we're going to make sidewalk investments.

01:00:39.240 --> 01:00:45.240
 The most important acknowledgement here is that pedestrians really do enjoy walking on a sidewalk.

01:00:45.240 --> 01:00:48.240
 They tend to not like walking in the street with cars or with big trucks.

01:00:48.240 --> 01:00:52.240
 So it's just an important acknowledgement that people really enjoy walking.

01:00:52.240 --> 01:01:04.240
 It's something we saw a lot of emphasis on as COVID emerged, stay at home orders were in place, people walked out the front doors and found out they were living in unwalkable communities.

01:01:04.240 --> 01:01:13.240
 So it really is a facility that makes your neighborhood an enjoyable place to walk as opposed to, say, a street that doesn't have sidewalks.

01:01:13.240 --> 01:01:16.240
 And I'll get into some caveats on that in a minute.

01:01:16.240 --> 01:01:21.240
 Our future is guided by that mobility plan, or at least I would say it was.

01:01:21.240 --> 01:01:33.240
 Now, I would say this process is helping us get a little bit ahead of that grand vision and it provides more specific detail where we're going to provide complete streets.

01:01:33.240 --> 01:01:40.240
 But the mobility plan that we're putting forward for adoption in a few weeks is really a true multimodal vision for the city.

01:01:40.240 --> 01:01:46.240
 So instead of just looking at cars and the thoroughfare plan, we have a bike plan, we have a PED plan.

01:01:46.240 --> 01:01:49.240
 This sidewalk work plan actually tells us how we're going to implement the PED plan.

01:01:49.240 --> 01:01:55.240
 So that's why I say it's a little bit more advanced, but we do have a true multimodal vision for the city that we're working to deliver.

01:01:55.240 --> 01:01:59.240
 And this is one part of that.

01:01:59.240 --> 01:02:06.240
 One of the acknowledgments that we wanted to make sure everybody recognized is just that we don't own all the streets in the city.

01:02:06.240 --> 01:02:10.240
 There are textile roads or state roads that we have.

01:02:10.240 --> 01:02:14.240
 We don't have control over them. We can encourage the state to make changes.

01:02:14.240 --> 01:02:22.240
 We can go in and make changes with their blessing, but there are streets within the city that are not -- they're not city streets.

01:02:22.240 --> 01:02:30.240
 And so we made this map just to give folks an idea of where we have city streets, where we have county streets, and where the streets are textile.

01:02:30.240 --> 01:02:38.240
 So there are three maps in the present -- or in this story map. I think it's not a true presentation.

01:02:38.240 --> 01:02:44.240
 They're interactive maps. They allow you to turn things on and off and play with the visualization.

01:02:44.240 --> 01:02:52.240
 So just to give you an idea, you can go in and search any address using the little search button on the upper left-hand corner.

01:02:52.240 --> 01:02:58.240
 You can turn layers on and off if you wish to. There's a little interactive legend.

01:02:58.240 --> 01:03:06.240
 So you can actually see what's a city street, what's a textile street, or what is a county roadway.

01:03:06.240 --> 01:03:13.240
 It really gives anybody who's viewing this information the opportunity to look in their neighborhood, look at a specific area of interest in the city.

01:03:13.240 --> 01:03:19.240
 So that's why we're not doing a PowerPoint presentation today. We're facilitating using this medium.

01:03:19.240 --> 01:03:25.240
 So just to highlight a few of those features.

01:03:25.240 --> 01:03:31.240
 Yeah, this thing is a little glitchy sometimes. I gotta make sure it loads up correctly.

01:03:31.240 --> 01:03:43.240
 So to inform development of the sidewalk park plan, when I came on board, we really started with a lot of robust data information that came out of our ADA transition plan.

01:03:43.240 --> 01:03:51.240
 So the ADA transition plan, the core of that plan is really to look at our existing assets and their condition.

01:03:51.240 --> 01:03:56.240
 Fortunately, our consultant also collected data on where we were missing sidewalks.

01:03:56.240 --> 01:04:05.240
 So we were able to use the information from the ADA transition plan not only to see conditions of existing sidewalks, ramps, any conflicts that we had in those facilities,

01:04:05.240 --> 01:04:11.240
 but we can also see where they're missing and then start to analyze all of that information on a citywide basis.

01:04:11.240 --> 01:04:19.240
 A lot of communities I work with don't have that much information, so it's actually really helpful to have all that information.

01:04:19.240 --> 01:04:26.240
 I did all the analysis myself, so to have it all at my disposal to run that analysis was really great.

01:04:26.240 --> 01:04:29.240
 I'll walk you through kind of how all that came together.

01:04:29.240 --> 01:04:39.240
 So to help us identify where to make sidewalk investments, historically the city has used a process that is called a pedestrian potential index.

01:04:39.240 --> 01:04:45.240
 That pedestrian potential index is really looking at, you know, we need a lot of sidewalks.

01:04:45.240 --> 01:04:50.240
 When you look at a citywide basis, where are the sidewalks going to be used if we make those investments?

01:04:50.240 --> 01:04:56.240
 Sometimes it's pretty easy to go out and make an investment where it doesn't pair well with where the users are located.

01:04:56.240 --> 01:05:05.240
 So it's really important for us to leverage data to understand where those dollars are going to translate to payment under people's feet.

01:05:05.240 --> 01:05:15.240
 So this pedestrian potential index is a way that we can assess that potential to meet needs where they are located.

01:05:15.240 --> 01:05:21.240
 So historically that had been a bit more of a focused effort.

01:05:21.240 --> 01:05:27.240
 I see needs. I see a ghost path or a worn path on the side of the road.

01:05:27.240 --> 01:05:36.240
 And it was less data driven and more driven by just a process of visual identification, if you will.

01:05:36.240 --> 01:05:40.240
 The process I'm presenting to you today was more of a data analysis.

01:05:40.240 --> 01:05:43.240
 So it's driven by different metrics.

01:05:43.240 --> 01:05:47.240
 I'll walk you through the metrics that feed into the resulting paths.

01:05:47.240 --> 01:05:52.240
 There are some limitations to that and we'll get into that a little bit later.

01:05:52.240 --> 01:06:01.240
 So basically what we did at a citywide level is analyzed every sidewalk segment that's missing and gave it a point for each of these criteria.

01:06:01.240 --> 01:06:05.240
 To summarize all the points, you get a PPI score or a pedestrian potential index.

01:06:05.240 --> 01:06:10.240
 First is major streets. Major streets are the roads that connect most places most directly.

01:06:10.240 --> 01:06:18.240
 They tend to be the easiest way for a pedestrian to make their trip because local streets might discontinue at the end of a project.

01:06:18.240 --> 01:06:22.240
 They may not connect through. It's called a SACS or something like that.

01:06:22.240 --> 01:06:28.240
 So major streets tend to be a very direct way for a pedestrian to get from point A to point B.

01:06:28.240 --> 01:06:33.240
 So each of those were given a point. There are some ways that we could play with that data to further refine it.

01:06:33.240 --> 01:06:40.240
 But for this level of analysis, we just gave each of what we call our thoroughfare or collector and arterial streets a point.

01:06:40.240 --> 01:06:46.240
 Another category is schools. Schools represent an area where pedestrian activity tends to be very high.

01:06:46.240 --> 01:06:52.240
 Students can't drive themselves until they get to be a certain age. So they're a very good user type to try and support.

01:06:52.240 --> 01:06:59.240
 There are also a lot of funding programs that are driven around supporting that walkability around schools.

01:06:59.240 --> 01:07:02.240
 So that's an important acknowledgement as well.

01:07:02.240 --> 01:07:09.240
 Government facilities. We have a duty from an ADA perspective to make sure that our facilities are accessible.

01:07:09.240 --> 01:07:19.240
 There are also places that our customers as a city need to get to. So each one of those locations is a potential generator or tractor of pedestrian trips.

01:07:19.240 --> 01:07:21.240
 We need to make sure that they're accessible.

01:07:21.240 --> 01:07:25.240
 So we gave a point to each of those. That's like the building we're sitting in right now.

01:07:25.240 --> 01:07:30.240
 But it's also things like libraries and parks and other park trails, buildings like that.

01:07:30.240 --> 01:07:36.240
 So those are all considered government facilities for the sake of this exercise.

01:07:36.240 --> 01:07:39.240
 And then points of interest is all that other stuff that people might walk to.

01:07:39.240 --> 01:07:45.240
 So this is restaurants, shopping, maybe going to the doctor's office or the dentist.

01:07:45.240 --> 01:07:48.240
 So places that people might need to get to by foot.

01:07:48.240 --> 01:07:57.240
 Maybe it's a place that's more based on the need to get from a transit stop to that essential service.

01:07:57.240 --> 01:08:03.240
 So we have a lot of information about where all these sort of central business district areas are located.

01:08:03.240 --> 01:08:10.240
 And that helps us hone in on where there's a lot of activity that's going to drive those pedestrian trips.

01:08:10.240 --> 01:08:13.240
 And then the last point is just safety.

01:08:13.240 --> 01:08:19.240
 So when we see pedestrian crashes, it doesn't mean that there is a missing facility necessarily.

01:08:19.240 --> 01:08:25.240
 That's a good indication that in some proximity of where that crash occurred, something's not working right.

01:08:25.240 --> 01:08:31.240
 And so giving a point to some proximity helps us focus that we have pedestrian activity.

01:08:31.240 --> 01:08:35.240
 We need to take a look at what's not working in that area and try to correct it.

01:08:35.240 --> 01:08:38.240
 So those are the five characteristics that we looked at.

01:08:38.240 --> 01:08:42.240
 Somewhere around a quarter mile of spacing in general had to play with the numbers.

01:08:42.240 --> 01:08:47.240
 So like trails, if you do a quarter mile, it covers the whole city.

01:08:47.240 --> 01:08:50.240
 With very few exceptions, it covers the entire city.

01:08:50.240 --> 01:08:58.240
 So some of it was a little tighter, but the majority, that's a quarter mile spacing of each of those points.

01:08:58.240 --> 01:09:07.240
 And then apply from a geospatial analysis to identify all the segments, add up all the points, and we get a PPI score.

01:09:07.240 --> 01:09:09.240
 So I'm going to show you two maps.

01:09:09.240 --> 01:09:14.240
 The first map is going to be what our existing sidewalk projects are.

01:09:14.240 --> 01:09:21.240
 And these were identified with the old system of more of that manual look at where we need to invest in sidewalks.

01:09:21.240 --> 01:09:25.240
 The second map will display the results of that PPI evaluation.

01:09:25.240 --> 01:09:33.240
 So we wanted to make sure that nobody lost sight of the fact that we do have an existing sidewalk program in the city.

01:09:33.240 --> 01:09:38.240
 It has been informed by staff evaluation of where needs were located.

01:09:38.240 --> 01:09:42.240
 The sidewalks are under construction in a variety of places.

01:09:42.240 --> 01:09:46.240
 Some of the sidewalks that show up on this map have actually been completed.

01:09:46.240 --> 01:09:52.240
 And then we broke them out by year, which is the approximate year that each sidewalk segment would be completed.

01:09:52.240 --> 01:09:57.240
 Just to show, here's where you might see a sidewalk under construction in the city.

01:09:57.240 --> 01:10:04.240
 I can tell you right now that we have some medical parkway or medical center drive.

01:10:04.240 --> 01:10:07.240
 I forget the exact name here, but Med Park Drive.

01:10:07.240 --> 01:10:11.240
 These sidewalks were just completed a week or two ago.

01:10:11.240 --> 01:10:14.240
 So these are projects that are actively ongoing throughout the city.

01:10:14.240 --> 01:10:16.240
 You can take a look and see where they are.

01:10:16.240 --> 01:10:21.240
 There are also projects listed in here that will deliver sidewalks out of our other capital programs.

01:10:21.240 --> 01:10:29.240
 So that's road projects like rebuilding Hickory Street, the main L extension, the new bridge that will go over the DCETA line.

01:10:29.240 --> 01:10:34.240
 So sidewalk projects may be delivered standalone independent of other projects.

01:10:34.240 --> 01:10:38.240
 So they may be a component of a larger project as well.

01:10:38.240 --> 01:10:43.240
 That's an important acknowledgement.

01:10:43.240 --> 01:10:45.240
 So here's the PPI score map.

01:10:45.240 --> 01:10:47.240
 It might take a minute to load.

01:10:47.240 --> 01:10:52.240
 I'm trying to pre-seat it before we start talking.

01:10:52.240 --> 01:10:58.240
 The main point of going through a PPI analysis, from my perspective especially,

01:10:58.240 --> 01:11:02.240
 is that it's really important to see where those hot spots are.

01:11:02.240 --> 01:11:08.240
 And I'll show you in a minute how all the data parsed out.

01:11:08.240 --> 01:11:16.240
 But what's really helpful is when you can see the needs based on where we have the highest density of users

01:11:16.240 --> 01:11:21.240
 and where we have the greatest potential for users, it's also good to see some dispersion.

01:11:21.240 --> 01:11:27.240
 So we don't want to see all of our highest scores being just in downtown, just around a certain place.

01:11:27.240 --> 01:11:36.240
 We want to see it spread out because that helps us recognize that the evaluation didn't point us to a preconceived idea.

01:11:36.240 --> 01:11:39.240
 I want to make sure that downtown is the highest ranked.

01:11:39.240 --> 01:11:46.240
 So I made sure that all of my factors that I put into that evaluation favor downtown and that I get that result.

01:11:46.240 --> 01:11:52.240
 We saw a pretty good spread of where those highest ranks are because it's based on all those factors that I said,

01:11:52.240 --> 01:11:54.240
 like government facilities and things.

01:11:54.240 --> 01:12:01.240
 The parks and the schools and things like that really did spread the results around the city.

01:12:01.240 --> 01:12:04.240
 So that's really good from my perspective.

01:12:04.240 --> 01:12:07.240
 A few acknowledgments here.

01:12:07.240 --> 01:12:12.240
 The PPI of one is every missing sidewalk at one point.

01:12:12.240 --> 01:12:16.240
 So in addition to those factors that I said, we also apply the point.

01:12:16.240 --> 01:12:22.240
 So no sidewalk in our ranking receives a PPI of zero.

01:12:22.240 --> 01:12:24.240
 The zero is existing.

01:12:24.240 --> 01:12:27.240
 If it doesn't have a point, it's an existing sidewalk.

01:12:27.240 --> 01:12:31.240
 Otherwise, we have these reds and purples that are our higher scores.

01:12:31.240 --> 01:12:41.240
 And then you get into the yellows and oranges, and as you get down lower and lower, those scores start to look more like a radar map.

01:12:41.240 --> 01:12:43.240
 They're not as significant.

01:12:43.240 --> 01:12:47.240
 And then our existing sidewalk projects are shown in the green solid line.

01:12:47.240 --> 01:12:57.240
 So how this information will be used is we have to look at where those highest ranks are and start to identify potential projects,

01:12:57.240 --> 01:13:06.240
 take that information to the public, because it's really important as we, as cabinet projects, are delivering projects,

01:13:06.240 --> 01:13:13.240
 going through the planning, design, and then actual construction process that we're communicating at a tent.

01:13:13.240 --> 01:13:20.240
 That's a necessary step to make sure that we go, just like we have to go through and clear all our design,

01:13:20.240 --> 01:13:25.240
 we have to make sure that the public is aware that we're about to show up and do work.

01:13:25.240 --> 01:13:29.240
 So the next step with this information that you see is that we'll have to identify the next round of projects,

01:13:29.240 --> 01:13:35.240
 go through a public process to indicate where we intend to do that work, identify any constraints,

01:13:35.240 --> 01:13:42.240
 make sure that we have put together a fiscal plan that's responsible and that we can deliver within the available budget.

01:13:42.240 --> 01:13:46.240
 And that's how we use this information.

01:13:46.240 --> 01:13:54.240
 All right, so walk through what's next and then let you guys ask any questions that you might have.

01:13:54.240 --> 01:13:57.240
 So like I said, the first step is just project selection.

01:13:57.240 --> 01:14:04.240
 So we have to identify what makes the most sense, and we're looking at that from a network connectivity perspective.

01:14:04.240 --> 01:14:15.240
 We might see that our highest PPI scores are important, but we see a few 2s and 3s that would make a connection to an existing sidewalk.

01:14:15.240 --> 01:14:22.240
 So we have to look at that very practically to make appropriate recommendations at a network basis.

01:14:22.240 --> 01:14:26.240
 People want to walk, they don't want to find the sidewalk stops 100 feet from the intersection.

01:14:26.240 --> 01:14:31.240
 So we have to think about the recommendations that we're making from a project basis.

01:14:31.240 --> 01:14:37.240
 Once we've identified those segments that we want to build, we still have to go through that feasibility process.

01:14:37.240 --> 01:14:43.240
 We need to look at what are the opportunities and constraints along that proposed sidewalk section.

01:14:43.240 --> 01:14:47.240
 There might be utilities, could be trees. Trees is a very important conversation.

01:14:47.240 --> 01:14:55.240
 I've had several times this week actually about tree removals, so we're looking very carefully at when we put in a sidewalk,

01:14:55.240 --> 01:15:09.240
 what would the impacts be, what alternatives might we need to assume in that design to make sure that we limit impacts to adjacent property owners, utilities, trees, whatever the potential impacts may be.

01:15:09.240 --> 01:15:18.240
 This picture is on Carroll Boulevard. I can think of a few streets that are more important to have sidewalk projects on than Carroll, but none of them.

01:15:18.240 --> 01:15:25.240
 So that's just an important acknowledgement. Another part of that process is stakeholder engagement.

01:15:25.240 --> 01:15:31.240
 So like I said, we've taken this presentation to a handful of our committees. We're going to see you guys today.

01:15:31.240 --> 01:15:38.240
 Making sure that we're receiving that input, making sure that this approach is comprehensive and that it's informed by the majority of the city.

01:15:38.240 --> 01:15:47.240
 And a big part of that was making sure that we have spoken with the committee on persons with disabilities

01:15:47.240 --> 01:15:55.240
 because ensuring equal access and that these improvements are designed appropriately is an important part of that process.

01:15:55.240 --> 01:15:58.240
 So we're going to make that acknowledgement as well.

01:15:58.240 --> 01:16:05.240
 Once we've gone through all of that background to identify the projects and tee them up and make sure we understand a feasible design,

01:16:05.240 --> 01:16:09.240
 we still have to do the design before we get into construction.

01:16:09.240 --> 01:16:15.240
 So that was just a quick acknowledgement of what that would look like.

01:16:15.240 --> 01:16:23.240
 Quick summary. So like I said, so if I isolate that, the result of the PPI evaluation,

01:16:23.240 --> 01:16:33.240
 what I wanted to see in this data was that as you go from that highest rank to the lowest rank, you see some graduation in the results.

01:16:33.240 --> 01:16:39.240
 So you wouldn't want to see equal distribution where your PPI 1 and your PPI 6 are equal numbers.

01:16:39.240 --> 01:16:46.240
 You want to see that number gradually get bigger until you get to the lowest rank and that was the outcome of this evaluation.

01:16:46.240 --> 01:16:53.240
 So our PPI 6 is only a half mile of missing sidewalk and then PPI 5 goes to about five miles.

01:16:53.240 --> 01:17:02.240
 So as those numbers get bigger, the rank gets lower. That means we've got manageable amounts of high PPI to low PPI.

01:17:02.240 --> 01:17:09.240
 So as we start to make those improvements and then rerun this evaluation, hopefully those numbers will stay sort of distributed like this.

01:17:09.240 --> 01:17:13.240
 So it's manageable and we're making those investments where they're needed the most.

01:17:13.240 --> 01:17:23.240
 So that was a good outcome. I was afraid it wouldn't turn out that way, but it actually did. That was great.

01:17:23.240 --> 01:17:30.240
 And then the last step before I turn it over to you all for discussion and questions is just community engagement.

01:17:30.240 --> 01:17:40.240
 So it's not uncontentious to make recommendations where to put sidewalks and how we're going to build those sidewalks.

01:17:40.240 --> 01:17:50.240
 So it's really important that out of any process, sidewalks, bike lanes, building a new road, that we engage with the community, engage with our stakeholders.

01:17:50.240 --> 01:18:03.240
 And we have a discussed end page that's linked here. And on that discussed end page, folks can ask questions, they can make recommendations, they can seek any clarity that they need.

01:18:03.240 --> 01:18:12.240
 But like I mentioned, a part of this process is that we have to identify the next round of projects and then get them out front of the public so they can see where we plan to work next.

01:18:12.240 --> 01:18:21.240
 Our projects are outlined from 2021 to 2024, give or take. So we're talking the next round of projects will be 2025 and later.

01:18:21.240 --> 01:18:27.240
 So that'll be an upcoming process that we'll go through as we identify that next round of projects.

01:18:27.240 --> 01:18:36.240
 And anybody who wants more information, they can go to Discuss Denton and communicate with us there or they can see this presentation.

01:18:36.240 --> 01:18:42.240
 And with that, I will stop talking and let you guys ask questions.

01:18:42.240 --> 01:18:46.240
 Do you have questions? Go ahead.

01:18:46.240 --> 01:18:53.240
 Yeah, so I noticed my road is in there and we're at PP level one.

01:18:53.240 --> 01:19:00.240
 And I know that there's been a bunch of people in my neighborhood who have talked about issues on my road and the need for sidewalks.

01:19:00.240 --> 01:19:09.240
 And so I just wonder how you weigh if there's like a neighborhood that's asking for sidewalks versus your rankings and how you make those determinations.

01:19:09.240 --> 01:19:16.240
 Yeah, because there's some subjectivity in this point of interest is how you're defining a point of interest.

01:19:16.240 --> 01:19:20.240
 But neighbors might define something else as a point of interest that you're not capturing.

01:19:20.240 --> 01:19:31.240
 Right. Exactly. And I would say that this is one way of taking data, evaluating it, and making recommendations. It's not project recommendations.

01:19:31.240 --> 01:19:37.240
 So there's, like you said, subjectivity to how we would apply the results of that evaluation.

01:19:37.240 --> 01:19:45.240
 I'd say we were not preparing this evaluation with the intent of deprioritizing anywhere.

01:19:45.240 --> 01:19:50.240
 We prepared it with the intent of identifying where the highest priorities are, because, you know,

01:19:50.240 --> 01:19:59.240
 if I have a community requesting a sidewalk in an area with a low potential for pedestrian activity

01:19:59.240 --> 01:20:06.240
 and I've got people walking in a worn grass path on the side of a major roadway,

01:20:06.240 --> 01:20:15.240
 this data suggests that I need to make the investment where I've got a lot of people in a worn grass path on the side of a busy roadway

01:20:15.240 --> 01:20:18.240
 before I make the investment in a neighborhood.

01:20:18.240 --> 01:20:24.240
 The folks who would make the decision whether we need to invest in that neighborhood above somewhere else

01:20:24.240 --> 01:20:36.240
 are department heads or my bosses or politically elected or appointed folks who would identify a different priority.

01:20:36.240 --> 01:20:43.240
 So we're going to make decisions based on that data-driven process and working with the public.

01:20:43.240 --> 01:20:51.240
 But we may not say we're going to go and we're not going to necessarily recommend a sidewalk improvement in a neighborhood

01:20:51.240 --> 01:21:00.240
 where there's not a park or a school or some other asset that would drive that need, if that answers your question.

01:21:00.240 --> 01:21:05.240
 Sort of, but it's still, I mean, like, we live near a school, but it's a university.

01:21:05.240 --> 01:21:08.240
 We live near a park, but it's part of the university.

01:21:08.240 --> 01:21:15.240
 So to me, I could see where you're not capturing certain things based on the route that you might be using.

01:21:15.240 --> 01:21:24.240
 The thing in the school maybe has something else. We live in an street that doesn't have actually an area where you can walk on and tread a trail.

01:21:24.240 --> 01:21:27.240
 So you have to walk on the street. So you wouldn't be able to see that.

01:21:27.240 --> 01:21:34.240
 Yeah, that was a limitation. I expressed this to other staff as I was working on the evaluation,

01:21:34.240 --> 01:21:41.240
 that we can't evaluate worn paths because I'd have to run some kind of,

01:21:41.240 --> 01:21:47.240
 take the aerials and run a raster analysis to identify what a worn path is.

01:21:47.240 --> 01:21:53.240
 So that is a factor that was considered previously that we can't do from a data-driven perspective

01:21:53.240 --> 01:21:59.240
 to identify where there's that kind of demand or evidence of demand, if you will.

01:21:59.240 --> 01:22:02.240
 But yeah, there are other metrics that could be used.

01:22:02.240 --> 01:22:10.240
 I mentioned I would acknowledge one that I forgot to circle back to, but transit is one that is not included in this evaluation.

01:22:10.240 --> 01:22:18.240
 Key reason with that being DCTA last year was still in the process of making their recommendations of how they would address transit.

01:22:18.240 --> 01:22:23.240
 So we didn't have an understanding of what transit looked like in the city at that time.

01:22:23.240 --> 01:22:29.240
 We do now, but it's still unclear what DCTA's plan is.

01:22:29.240 --> 01:22:38.240
 So that's another limitation of this evaluation is we don't have a full understanding of what that's going to be.

01:22:38.240 --> 01:22:44.240
 To me it's a little dissatisfying to hear that we'll run this whole plan,

01:22:44.240 --> 01:22:50.240
 but if a neighborhood has an issue, they shouldn't come talk to us, they should go talk to their councilman.

01:22:50.240 --> 01:22:52.240
 Oh no, you can absolutely talk to us.

01:22:52.240 --> 01:23:01.240
 I can tell you the response from a staff perspective is going to be that we're going to first look at this data to see what it suggests.

01:23:01.240 --> 01:23:08.240
 We're not ignoring the universities because as the bike, pet, and ADA coordinator for the city,

01:23:08.240 --> 01:23:15.240
 my primary focus, and I've been very clear about this from taking time that I took the job,

01:23:15.240 --> 01:23:21.240
 my primary focus is UNT, TWAU, and Downtown, and it branches out from there.

01:23:21.240 --> 01:23:29.240
 There are other big destinations outside of that that could potentially drive a lot of bike and pet activity,

01:23:29.240 --> 01:23:31.240
 but those are the three biggest areas.

01:23:31.240 --> 01:23:39.240
 If I heat map, that's my three hottest spots in the city, so I won't ever ignore those three areas.

01:23:39.240 --> 01:23:49.240
 That's not to say that there aren't barriers around those three areas that might limit the opportunity for somebody to travel.

01:23:49.240 --> 01:23:56.240
 We have to fix the barrier, like a major street crossing or something like that, or I-35.

01:23:56.240 --> 01:24:04.240
 We might have to figure out how to cross a major barrier with a very costly project before we look on the other side of the barrier.

01:24:04.240 --> 01:24:07.240
 That's another way we have to look at things.

01:24:07.240 --> 01:24:15.240
 The purpose of this Discuss Denton page is to have those conversations, to understand where there is demand.

01:24:15.240 --> 01:24:18.240
 There's also our broader capital projects.

01:24:18.240 --> 01:24:22.240
 There are streets that are not what we would call complete streets.

01:24:22.240 --> 01:24:30.240
 They're missing sidewalks, or they're missing bike lanes, or they're not up to the functional classes called for in our mobility plan.

01:24:30.240 --> 01:24:36.240
 Then those become separate projects where we have a handful of them that are still planned.

01:24:36.240 --> 01:24:44.240
 I'll just refer to Ryan Road, because that's one that we have, a capital project that's going through at least some level of design.

01:24:44.240 --> 01:24:46.240
 That's not a sidewalk project.

01:24:46.240 --> 01:24:51.240
 We're going to rebuild the road, and then the sidewalk will be part of that.

01:24:51.240 --> 01:24:56.240
 Teasley's Tech Stots Road, so I can use that as an example.

01:24:56.240 --> 01:24:59.240
 They're putting sidewalks in, maybe not the facility we'd like.

01:24:59.240 --> 01:25:03.240
 It's not what we're going to call for in the new mobility plan.

01:25:03.240 --> 01:25:06.240
 That project, they would never have come in and built a sidewalk.

01:25:06.240 --> 01:25:10.240
 They widened the road to six lanes and put sidewalks in.

01:25:10.240 --> 01:25:13.240
 This is a discussion.

01:25:13.240 --> 01:25:18.240
 It's kind of like to stimulate discussions.

01:25:18.240 --> 01:25:26.240
 It's because the projects are in place, so there's going to be no new sidewalks until after 2024 in terms of what this plan might do.

01:25:26.240 --> 01:25:28.240
 For those projects, yes.

01:25:28.240 --> 01:25:38.240
 I'll say one of the other ways we found this information really useful is when we're looking at our projects that are still in a planning or early in design.

01:25:38.240 --> 01:25:43.240
 We've been able to check, especially with ADA data.

01:25:43.240 --> 01:25:54.240
 We've been able to look at our projects and see if there are high rated, high ranking sidewalks that need to be replaced or maybe poor condition sidewalks and ramps that need to be repaired.

01:25:54.240 --> 01:26:05.240
 The data's actually been really helpful on the capital project side of helping identify ... I'm going to go off on a tangent for just a second.

01:26:05.240 --> 01:26:12.240
 Federal government only requires us, when we do a roadway project, to repair the ramps or put in ramps that are missing.

01:26:12.240 --> 01:26:23.240
 This data has helped to justify closing sidewalk gaps that are not required in a project, unless we institute a policy and we will construct those sidewalks.

01:26:23.240 --> 01:26:31.240
 It's a self-imposed requirement, but we're not mandated that we have to put in the sidewalk when we widen the roadway.

01:26:31.240 --> 01:26:36.240
 We only have to, or I shouldn't say widen, when we repair a roadway, when we go in and repave it.

01:26:36.240 --> 01:26:46.240
 This data has helped us to close some sidewalk gaps or to make repairs based on the assessment and the conditions.

01:26:46.240 --> 01:26:53.240
 That's been another really useful way that we've been able to use the data as staff.

01:26:53.240 --> 01:26:59.240
 It doesn't address the concerns you're raising about where we need to install sidewalks that are missing in the neighborhood.

01:26:59.240 --> 01:27:06.240
 We have a lot of those neighborhoods that are built without sidewalks anywhere.

01:27:06.240 --> 01:27:10.240
 The approach there has to be looking at it from a network perspective.

01:27:10.240 --> 01:27:18.240
 Where can we make the A to B connection through the neighborhood along the street that's going to capture the most pedestrian traffic?

01:27:18.240 --> 01:27:22.240
 Maybe on one side of the street instead of both.

01:27:22.240 --> 01:27:32.240
 That becomes a very qualitative assessment to identify where to make that sidewalk investment if we're not coming in and doing another project like a road or utility.

01:27:32.240 --> 01:27:37.240
 We have a number of projects like that where it's moving.

01:27:37.240 --> 01:27:39.240
 Let's go up here to one of them.

01:27:46.240 --> 01:27:55.240
 One of our streets that we're putting in a sidewalk on one side of Renard Street which is down in the Demian neighborhood.

01:27:55.240 --> 01:28:11.240
 If I could, say, go out and put sidewalks on both sides of the street because that's our preference, that's what we would build.

01:28:11.240 --> 01:28:13.240
 Sorry, it's just taking a second to load.

01:28:13.240 --> 01:28:18.240
 It would be ideal if every time we did a sidewalk project we were going to that gold standard.

01:28:18.240 --> 01:28:23.240
 That was one of the issues that many old persons with disabilities were really focused on.

01:28:23.240 --> 01:28:31.240
 Why can't we eliminate all the barriers, get rid of telephone poles and mailboxes that are in the sidewalk?

01:28:31.240 --> 01:28:34.240
 We can't always deliver the ideal project.

01:28:34.240 --> 01:28:36.240
 It all depends on the scope of the project.

01:28:36.240 --> 01:28:42.240
 If it's a sidewalk only project and we can only build it on one side of the street, maybe that's the best facility we can get in.

01:28:42.240 --> 01:28:45.240
 But at least we've got something there.

01:28:45.240 --> 01:28:57.240
 That's not the ideal answer, and I wish it was, but at least we're making a connection, if this thing was, between two points where there is a sidewalk.

01:28:57.240 --> 01:29:02.240
 I can tell you right now the sidewalk along the north side of Parvin is a very poor condition sidewalk.

01:29:02.240 --> 01:29:04.240
 It's probably about two or three feet wide.

01:29:04.240 --> 01:29:12.240
 So we put in to trip fund construction of a sidewalk on the south side that would make a link.

01:29:12.240 --> 01:29:17.240
 There's an elementary school over here, I forget the name of the school.

01:29:17.240 --> 01:29:30.240
 But there's an opportunity there to make an improvement on the other side of the street that makes a true ADA compliant facility that are connected with the Bernard sidewalk that we're constructing.

01:29:30.240 --> 01:29:35.240
 So then we'll start having more network connectivity in that part of the neighborhood.

01:29:35.240 --> 01:29:38.240
 One more question.

01:29:38.240 --> 01:29:41.240
 We do have other questions about other topics.

01:29:41.240 --> 01:29:45.240
 So how often will you update these PPI rankings?

01:29:45.240 --> 01:29:58.240
 Because even looking at this map, it's outdated because in that gray area to the left, that's a huge new development that I'm expecting is not being taken into consideration about.

01:29:58.240 --> 01:30:03.240
 Traffic and major roadways running through this neighborhood.

01:30:03.240 --> 01:30:07.240
 So the data is 2020.

01:30:07.240 --> 01:30:10.240
 Early 2020 was when it was all collected.

01:30:10.240 --> 01:30:19.240
 And I've been going through to clean up some of the, you know, where a new sidewalk has been constructed, that sort of thing.

01:30:19.240 --> 01:30:31.240
 The goal of staff is to have this map, which is GIS based, tied to our asset management software, which is how our streets department uses the data.

01:30:31.240 --> 01:30:39.240
 So then this doesn't answer the PPI score question, but just so we have a real time understanding of where we have sidewalks.

01:30:39.240 --> 01:30:43.240
 That's a process that we're building out, I would call a protocol.

01:30:43.240 --> 01:30:50.240
 So as sidewalks are constructed and accepted by the city, they'll populate into this map and into that software.

01:30:50.240 --> 01:30:55.240
 So then we'll have a real understanding of where we have sidewalks and when they were constructed.

01:30:55.240 --> 01:31:02.240
 A little better understanding so we can make sure that repairs can be tracked over time and we can assess need.

01:31:02.240 --> 01:31:11.240
 And that helps us from a fiscal impact analysis perspective understanding of where we might need to make improvements based on the age of the infrastructure.

01:31:11.240 --> 01:31:19.240
 How often we'll reevaluate the PPI scores, I don't have an answer for right now.

01:31:19.240 --> 01:31:26.240
 I would expect we'd do it each time we're looking at that capital program to make a new assessment.

01:31:26.240 --> 01:31:32.240
 So it might be, it could be annually because it only takes a couple of minutes to run the evaluation.

01:31:32.240 --> 01:31:42.240
 But it could also be semi-annually every three years, just really depends on how often we see the need to update those rankings.

01:31:42.240 --> 01:31:47.240
 There's no qualitative observations that go into the PPI score at all.

01:31:47.240 --> 01:31:51.240
 I mean it's basically you're just, everything is within GIS.

01:31:51.240 --> 01:31:58.240
 Yes, it's not a qualitative evaluation. It's really to give us just a, it's going to be a one-to-one.

01:31:58.240 --> 01:32:03.240
 I put in data, I get an output, and we can then tweak the factors.

01:32:03.240 --> 01:32:10.240
 So like I mentioned earlier, there are ways that we could tweak for speed limits, for width of a roadway, for number of lanes.

01:32:10.240 --> 01:32:13.240
 There are a lot of different ways that we could play with the data.

01:32:13.240 --> 01:32:26.240
 The goal wasn't to get too into that approach, but more so to focus on what are the outputs, do they make sense, start identifying projects out of that.

01:32:26.240 --> 01:32:31.240
 Because I'm always of the opinion data is great, but I want to do something.

01:32:31.240 --> 01:32:35.240
 So I don't think we need to have the perfect data.

01:32:35.240 --> 01:32:40.240
 I think we need to have a good enough data source to make strong decisions from.

01:32:40.240 --> 01:32:47.240
 And we're making recommendations that are out of line with elected appointed bodies or the public.

01:32:47.240 --> 01:32:51.240
 We'll hear that through the process.

01:32:51.240 --> 01:32:57.240
 Adam? Yeah, thank you for this. It's a really cool tool.

01:32:57.240 --> 01:33:07.240
 We've spent 70 years building a city for cars, not people, and I see you trying your best to rectify where you can.

01:33:07.240 --> 01:33:13.240
 All of that, and that's zoning and design, and it's a built environment that's a mess.

01:33:13.240 --> 01:33:19.240
 I'm really interested in going forward, how do we do better, and are we doing better?

01:33:19.240 --> 01:33:22.240
 Are we really now thinking about complete streets?

01:33:22.240 --> 01:33:25.240
 Are we really thinking about genuine walkability?

01:33:25.240 --> 01:33:30.240
 You know, sidewalk is an interesting term. It means it's on the side of something that's at the center.

01:33:30.240 --> 01:33:35.240
 Can we, and if so how, can we think about center walks?

01:33:35.240 --> 01:33:43.240
 In other words, how do we think about walking as the best way, not just to enjoy yourself, for a stroll, which is super important.

01:33:43.240 --> 01:33:49.240
 Like to actually go shopping, to actually get to school, to actually displace car trips.

01:33:49.240 --> 01:33:55.240
 Are we able to do that in the new developments? Can we do better?

01:33:55.240 --> 01:33:59.240
 And if so, how does your position weigh in on that?

01:33:59.240 --> 01:34:04.240
 Yeah, unfortunately a lot of that is out of my control because I'm in capital projects, not planning.

01:34:04.240 --> 01:34:14.240
 And you're asking questions that are very, very great questions because that's how we need to look at it.

01:34:14.240 --> 01:34:25.240
 So let me answer first how we're making improvements in how the city is delivering transportation projects and that complete streets aspect of things.

01:34:25.240 --> 01:34:35.240
 So earlier this year we adopted new transportation standards and that was a process that was done semi-infrequently.

01:34:35.240 --> 01:34:40.240
 And the process has been put in place to make those updates on an annual basis.

01:34:40.240 --> 01:34:47.240
 Part of that was as we were working on the mobility plan update and having those sort of what I'll call guiding principles,

01:34:47.240 --> 01:34:53.240
 what our vision is for what streets look like, we were able to make changes in the transportation standards

01:34:53.240 --> 01:35:01.240
 that say when you build this type of road, collector or arterial, whatever the road type is, this is the facility that goes along with it.

01:35:01.240 --> 01:35:08.240
 So if you build a Teasley Road today, the road that's currently under construction with sidewalks,

01:35:08.240 --> 01:35:11.240
 instead of having sidewalks it would have a side path.

01:35:11.240 --> 01:35:18.240
 So our standards have been updated to provide more robust facilities, greater separation from traffic.

01:35:18.240 --> 01:35:23.240
 So that term sidewalk that you referred to and how we get it more to the center,

01:35:23.240 --> 01:35:27.240
 we're actually not focusing on how to get it more to the center but how to make it more comfortable,

01:35:27.240 --> 01:35:32.240
 how to provide a better quality environment for anybody who wants to take those kinds of trips,

01:35:32.240 --> 01:35:39.240
 walk or bike or whatever it may be, transit, transits of what is really important.

01:35:39.240 --> 01:35:41.240
 So that's part of it.

01:35:41.240 --> 01:35:49.240
 But then the other part is the land use aspect which is that falls under planning and other planning and zoning board,

01:35:49.240 --> 01:35:57.240
 other folks who have the oversight because we can make a really great environment for somebody to walk on

01:35:57.240 --> 01:36:03.240
 but if the trip is too long, if you're trying to make a trip from outside the loop to downtown,

01:36:03.240 --> 01:36:06.240
 you're not going to make that trip in one foot, not likely.

01:36:06.240 --> 01:36:13.240
 There are some folks I've heard that walk that far but in general we have to acknowledge that trips have a certain distance

01:36:13.240 --> 01:36:18.240
 and outside of that distance most users are going to go get their car.

01:36:18.240 --> 01:36:20.240
 There are certainly limitations to that.

01:36:20.240 --> 01:36:24.240
 Somebody who doesn't have a car may choose to ride their bike.

01:36:24.240 --> 01:36:29.240
 Somebody who doesn't have a car or bike might walk and those trip distances would be outside the norms

01:36:29.240 --> 01:36:32.240
 but in general people are going to walk a half mile or less.

01:36:32.240 --> 01:36:35.240
 People might ride their bike two miles.

01:36:35.240 --> 01:36:42.240
 So part of that is really us as a city working to make sure that we want to have this walking and biking activity,

01:36:42.240 --> 01:36:47.240
 we're pairing that land use with it to make sure that those trips are within a reasonable distance.

01:36:47.240 --> 01:36:55.240
 And I'm looking at it, I'll scroll out of this thing because it didn't load up,

01:36:55.240 --> 01:37:03.240
 I'm looking at that same sort of principle as we look around the city for do we have a neighborhood shopping center,

01:37:03.240 --> 01:37:06.240
 there's a certain distance away from a neighborhood shopping center,

01:37:06.240 --> 01:37:10.240
 we can create the opportunity to take those trips by foot or by bike.

01:37:10.240 --> 01:37:15.240
 So that's not something that I've really been able to, I've only been here seven months,

01:37:15.240 --> 01:37:19.240
 I haven't had time to get that far into my approach yet.

01:37:19.240 --> 01:37:23.240
 But that is something that we'll look at is what a reasonable trip distance is

01:37:23.240 --> 01:37:27.240
 and how to make those trips accessible, walking or biking.

01:37:27.240 --> 01:37:34.240
 So that's part of our approach for the bike and bed program, I would say, is to look at that attraction generation

01:37:34.240 --> 01:37:37.240
 and start making investments that way.

01:37:37.240 --> 01:37:41.240
 Adam, did you have another follow-up, or Brian?

01:37:41.240 --> 01:37:43.240
 I just want to echo one more time what Matt was saying.

01:37:43.240 --> 01:37:45.240
 Make sure you do this every time.

01:37:45.240 --> 01:37:46.240
 Sorry.

01:37:46.240 --> 01:37:50.240
 What Matt was saying I feel like may be the most important component of this data.

01:37:50.240 --> 01:37:54.240
 If we really are using this to inform future projects,

01:37:54.240 --> 01:38:00.240
 I would sincerely hope we see a lot more community-driven and participatory functions down the line.

01:38:00.240 --> 01:38:06.240
 I know this just lives right now in your office and the avenue for people to engage with it is a discussion platform.

01:38:06.240 --> 01:38:09.240
 I just hope that if that's where this data is going,

01:38:09.240 --> 01:38:16.240
 you really want to see a lot more open contribution where people can make real place-based inputs

01:38:16.240 --> 01:38:21.240
 for what you're driving these capital investments to be.

01:38:21.240 --> 01:38:29.240
 And then two, to my opinion, a sidewalk is pretty much useless if the road I need to cross is a big barrier for me.

01:38:29.240 --> 01:38:36.240
 So we mentioned the loop, we mentioned 35, and I see on your data here that crosswalks really aren't a factor.

01:38:36.240 --> 01:38:44.240
 So how does that build into the connectivity argument of incorporating all these different dislocated links?

01:38:44.240 --> 01:38:54.240
 Okay. I would say crosswalks, the reason you don't see crosswalks as a factor here is because we're really looking at that node to node,

01:38:54.240 --> 01:38:57.240
 like what's the piece that needs to be built.

01:38:57.240 --> 01:39:02.240
 And to me the crosswalk is the natural outcrop of building that link.

01:39:02.240 --> 01:39:10.240
 I'm also, I bring a lot of background from industry best practices and I'm like in the focus,

01:39:10.240 --> 01:39:17.240
 so I'm typically fighting with the traffic engineers about what's the appropriate crossing treatment type,

01:39:17.240 --> 01:39:24.240
 not just the crosswalk but what should be at the crosswalk to help people safely get across the street.

01:39:24.240 --> 01:39:28.240
 I think that's more where we're going to make standards into, you know,

01:39:28.240 --> 01:39:35.240
 we'll incorporate or refer or by inference provide guidance that points to industry best practices.

01:39:35.240 --> 01:39:43.240
 And the transportation criteria manual is sort of our guiding document and our standard details, investigations.

01:39:43.240 --> 01:39:49.240
 So all that stuff that we say, this is what we expect to be provided based on certain parameters.

01:39:49.240 --> 01:39:53.240
 We couldn't get that into the documents this year.

01:39:53.240 --> 01:39:57.240
 I got here late enough that we couldn't go through that process.

01:39:57.240 --> 01:40:04.240
 So like I said, that's an annual update that we'll be doing and we've made notes of all of those things that I want to include.

01:40:04.240 --> 01:40:10.240
 So it'll be references to MACTO, references to ITE, walkable urban thoroughfares,

01:40:10.240 --> 01:40:18.240
 all these different standards and best practices that we can refer to will help us then have that resolution

01:40:18.240 --> 01:40:25.240
 that this is what we expect and what we're going to not only expect of developers but of ourselves.

01:40:25.240 --> 01:40:33.240
 We deliver projects and I'm informing our capital projects as we're going through those to say,

01:40:33.240 --> 01:40:39.240
 here are the facilities that I expect to be included in the projects that I at least have influence on.

01:40:39.240 --> 01:40:41.240
 So you'll see things that are being constructed right now.

01:40:41.240 --> 01:40:49.240
 I have no influence on anything that I take a look at, the design, providing that input as of six months ago.

01:40:49.240 --> 01:40:50.240
 Do you have a thought on that?

01:40:50.240 --> 01:40:56.240
 Yeah, I mean, I respect the weight of your experience and that's why I'm so happy that you're in the room arguing

01:40:56.240 --> 01:41:00.240
 for the pedestrian qualities that we are really lacking in the city.

01:41:00.240 --> 01:41:05.240
 I suppose just a counterpoint, because it's not represented as a need and to your point,

01:41:05.240 --> 01:41:10.240
 you were able to influence discussions about what could be built in the future,

01:41:10.240 --> 01:41:15.240
 not necessarily looking at what gaps exist right now but what had been built.

01:41:15.240 --> 01:41:22.240
 So I'm just curious if there's a way to incorporate similar data sets of what you've done with the PPI maps

01:41:22.240 --> 01:41:27.240
 that also contributes to real areas of need where there might not be the same connectivity

01:41:27.240 --> 01:41:30.240
 even within block to block.

01:41:30.240 --> 01:41:37.240
 Yeah, that's a really important point because, like I said, this is really focused on how do we close gaps

01:41:37.240 --> 01:41:43.240
 and we have a tandem process, our ADA transition plan, which is also adopted in January.

01:41:43.240 --> 01:41:48.240
 So our ADA transition plan is all those existing assets and making improvements to those.

01:41:48.240 --> 01:41:50.240
 We have to look at the two programs together.

01:41:50.240 --> 01:42:00.240
 So it's not like we're saying one's a gap project and one's a repair project and we don't see any overlap between the two.

01:42:00.240 --> 01:42:08.240
 But we have to go through a similar evaluation of our ADA needs and there's a ton more subjectivity

01:42:08.240 --> 01:42:15.240
 in what do we do about our existing infrastructure because the federal government gets a lot of latitude

01:42:15.240 --> 01:42:22.240
 how we are going to prioritize improvements. Do we prioritize missing ramps and non-compliant ramps?

01:42:22.240 --> 01:42:26.240
 Do we prioritize removing point conflicts like utility goals?

01:42:26.240 --> 01:42:29.240
 So we have a lot of flexibility, which is good.

01:42:29.240 --> 01:42:34.240
 It just makes it a little bit of a challenge to say where we need to make the improvements.

01:42:34.240 --> 01:42:38.240
 What's the timeline and prioritization of that?

01:42:38.240 --> 01:42:46.240
 My at least initial focus had been to use PPI, the same sort of PPI ranking that gives us sort of our hot spots

01:42:46.240 --> 01:42:50.240
 of pedestrian activity around the city and then look at some of the greatest needs.

01:42:50.240 --> 01:42:55.240
 So like missing ramps is the biggest because people can't get across a curb.

01:42:55.240 --> 01:42:57.240
 So putting those in is certainly one of our highest priorities.

01:42:57.240 --> 01:43:04.240
 But there are other factors that we have to look at to identify what we're going to fix first.

01:43:04.240 --> 01:43:11.240
 And I've done a lot of work on that ADA side of like what is a true barrier versus what is something

01:43:11.240 --> 01:43:15.240
 that's a pretty tough barrier that most people can get through.

01:43:15.240 --> 01:43:20.240
 So very few people can get their wheelchair over a curb.

01:43:20.240 --> 01:43:25.240
 I've seen a few people do it, but that is one of the biggest barriers that there is out there.

01:43:25.240 --> 01:43:30.240
 But as a non-compliant sidewalk that's got a cross slip of 2.5%, there are a lot of them too.

01:43:30.240 --> 01:43:37.240
 Is that a true barrier and should you focus your attention on making it fully compliant?

01:43:37.240 --> 01:43:42.240
 My answer is always going to be if it's passable, if it means all the general geometry

01:43:42.240 --> 01:43:45.240
 and it's just slightly out of compliance, I'm not going to focus on it.

01:43:45.240 --> 01:43:47.240
 I need to put that attention somewhere else.

01:43:47.240 --> 01:43:50.240
 So hopefully that answers your question.

01:43:50.240 --> 01:43:53.240
 We have to do more work to get to that point.

01:43:53.240 --> 01:43:59.240
 Our streets department does most of those repairs, so we're working with them to make those improvements.

01:43:59.240 --> 01:44:04.240
 Some of that has been very driven by citizen input.

01:44:04.240 --> 01:44:10.240
 We've put in at least one crosswalk in the city since I got here that was missing.

01:44:10.240 --> 01:44:13.240
 We're looking at another one right now that's right next to UNT.

01:44:13.240 --> 01:44:20.240
 So some of those are just an outcome of hearing from the community of where we have some challenges

01:44:20.240 --> 01:44:22.240
 in getting out and making the corrections.

01:44:22.240 --> 01:44:27.240
 But hopefully we'll have a more data-driven process for that this spring.

01:44:27.240 --> 01:44:31.240
 One final question, Ken.

01:44:31.240 --> 01:44:37.240
 So I know obviously a PPI is one method to evaluate our sidewalk qualities.

01:44:37.240 --> 01:44:39.240
 I just wonder, is this available somewhere?

01:44:39.240 --> 01:44:41.240
 You said we've been using it for quite some time.

01:44:41.240 --> 01:44:47.240
 Yeah, all the information that you see on the screen is on a web-based platform.

01:44:47.240 --> 01:44:48.240
 So everything that you see here.

01:44:48.240 --> 01:44:50.240
 Finding the protocols for what's your PPI.

01:44:50.240 --> 01:44:52.240
 It was difficult to read in the fields.

01:44:52.240 --> 01:44:56.240
 If you open it up within your embedded maps, what the field actually meant

01:44:56.240 --> 01:44:59.240
 and how you collected that.

01:44:59.240 --> 01:45:05.240
 I'm just interested if you had a protocol breakdown of what you did to give these scores.

01:45:05.240 --> 01:45:10.240
 Yeah, it's basically this portion of the presentation if I go back here.

01:45:10.240 --> 01:45:13.240
 So there are major streets.

01:45:13.240 --> 01:45:17.240
 And you're saying you want to look at the attribute table and see what all the points are.

01:45:17.240 --> 01:45:22.240
 So each of these has an attribute in a table that gets a point.

01:45:22.240 --> 01:45:27.240
 The only one that's broken out separately, because I wasn't sure if I applied points differently

01:45:27.240 --> 01:45:31.240
 to six-lane versus four-lane versus two-lane streets, is the major streets.

01:45:31.240 --> 01:45:38.240
 So we ran a geospatial analysis that basically just says I can capture anything

01:45:38.240 --> 01:45:41.240
 within a certain distance of whatever the factor is.

01:45:41.240 --> 01:45:44.240
 So the factors were streets, schools.

01:45:44.240 --> 01:45:50.240
 Schools, I think, were based on the center line, like a point at the school location.

01:45:50.240 --> 01:45:53.240
 Same for government facilities.

01:45:53.240 --> 01:45:57.240
 Points of interest was we have like 4,000 points of interest in the city.

01:45:57.240 --> 01:46:02.240
 So that's everything from home-based businesses, which was a little bit of a challenge,

01:46:02.240 --> 01:46:06.240
 home-based businesses to everything that's inside the mall.

01:46:06.240 --> 01:46:10.240
 And then running that same sort of distance-based analysis.

01:46:10.240 --> 01:46:14.240
 And then crashes, this was all of our pedestrian crashes around the city.

01:46:14.240 --> 01:46:19.240
 And then each one of those, I ran the analysis and it picked up the line.

01:46:19.240 --> 01:46:26.240
 It would then, once it selected at a point, accumulate all the points, gives you the PPI score.

01:46:26.240 --> 01:46:30.240
 And each of them, the names are a little bit wonky

01:46:30.240 --> 01:46:35.240
 because you can't have spaces in the attribute table or in GIS.

01:46:35.240 --> 01:46:43.240
 So they might say something like MJR_RD_2_LN, something like that.

01:46:43.240 --> 01:46:50.240
 So there's a little bit of, you kind of have to figure those fields out,

01:46:50.240 --> 01:46:55.240
 but they sort of make sense if you pair the name with these fields right here.

01:46:55.240 --> 01:46:57.240
 Thank you so much.

01:46:57.240 --> 01:46:58.240
 Mr. Saban?

01:46:58.240 --> 01:47:00.240
 Yeah, just a suggestion.

01:47:00.240 --> 01:47:02.240
 Yes, sir.

01:47:02.240 --> 01:47:08.240
 The quality of the information that's going into the PPI index,

01:47:08.240 --> 01:47:16.240
 it is imperative that we hear and consider the needs of the taxpaying community.

01:47:16.240 --> 01:47:25.240
 You know, being a taxpayer in the city and the projection of tax rates to continue to increase on our homes,

01:47:25.240 --> 01:47:31.240
 we need a sidewalk and I'm paying towards sidewalks and I can't get a sidewalk.

01:47:31.240 --> 01:47:39.240
 The PPI needs to include, it needs to factor in that consumer concern such as that.

01:47:39.240 --> 01:47:44.240
 And then forward thinking, with the aging of the community,

01:47:44.240 --> 01:47:48.240
 walking is a very important part of our future health.

01:47:48.240 --> 01:47:53.240
 So I would just want to suggest that that become part of the factor, you know,

01:47:53.240 --> 01:48:00.240
 the aging of the community and the accessibility to take a good walk

01:48:00.240 --> 01:48:02.240
 in your immediate community.

01:48:02.240 --> 01:48:06.240
 I like to talk to Parks about beautifying it and so forth,

01:48:06.240 --> 01:48:08.240
 but the point I want to make here is, yeah,

01:48:08.240 --> 01:48:17.240
 we want to make this information more qualitative in terms of what is the taxpayer desire and need.

01:48:17.240 --> 01:48:21.240
 And I think it's been spoken to well so far.

01:48:21.240 --> 01:48:27.240
 So my part is just I highly recommend, however we can fit that into the PPI index,

01:48:27.240 --> 01:48:31.240
 the calculator would help us from a sustainability perspective.

01:48:31.240 --> 01:48:35.240
 And I'll say thank you for the comment because it does remind me

01:48:35.240 --> 01:48:39.240
 that there were another limitation of when we ran this evaluation

01:48:39.240 --> 01:48:41.240
 and I think it's still true today.

01:48:41.240 --> 01:48:44.240
 I don't think the data is going to come out until at least next month.

01:48:44.240 --> 01:48:48.240
 But one of the ways that I did hope to look at this data was through the new census

01:48:48.240 --> 01:48:53.240
 because that will provide some really good information about aging in place

01:48:53.240 --> 01:48:58.240
 or, you know, there are a lot of metrics that get put into the census data

01:48:58.240 --> 01:49:00.240
 and then we can run an evaluation against that.

01:49:00.240 --> 01:49:06.240
 And if that data hasn't published yet, to my knowledge at least, it should be out soon.

01:49:06.240 --> 01:49:09.240
 So as that data becomes available, I think that will be really helpful.

01:49:09.240 --> 01:49:13.240
 We'll be able to start running an evaluation against some of those metrics

01:49:13.240 --> 01:49:19.240
 that, you know, socioeconomic based evaluation will give us some really interesting ways

01:49:19.240 --> 01:49:24.240
 to reevaluate PPI and make it a more robust evaluation.

01:49:24.240 --> 01:49:26.240
 Like I said, this is a good starting point.

01:49:26.240 --> 01:49:33.240
 But we by no means consider this PPI score to be the final result or the final evaluation approach.

01:49:33.240 --> 01:49:38.240
 I appreciate your comments because I agree that those are very important variables.

01:49:38.240 --> 01:49:39.240
 And just a follow-up.

01:49:39.240 --> 01:49:40.240
 Go ahead.

01:49:40.240 --> 01:49:50.240
 I heard you say TWU, UNT, and downtown drives your prioritizing repairs, replacements, and so forth.

01:49:50.240 --> 01:49:57.240
 And yet I don't know how much those institutions were not downtown businessmen.

01:49:57.240 --> 01:49:59.240
 I understand they pay taxes and so forth.

01:49:59.240 --> 01:50:06.240
 But that community or the lifeline to the revenue stream to the city

01:50:06.240 --> 01:50:10.240
 and the community needs to be factored in there.

01:50:10.240 --> 01:50:18.240
 When I think about the UNTs and the TWUs, you're catering to a lot of people, absolutely necessary.

01:50:18.240 --> 01:50:20.240
 You're catering to a lot of transient people.

01:50:20.240 --> 01:50:21.240
 They come and go.

01:50:21.240 --> 01:50:24.240
 They walk on great sidewalks while they were at the university.

01:50:24.240 --> 01:50:28.240
 But the everyday citizen, kind of getting the short end of the stick.

01:50:28.240 --> 01:50:29.240
 I'm done.

01:50:29.240 --> 01:50:30.240
 That's my situation.

01:50:30.240 --> 01:50:33.240
 Yeah, I by no means mean we're only focused in those areas.

01:50:33.240 --> 01:50:34.240
 Perfect.

01:50:34.240 --> 01:50:41.240
 But from where we have the highest potential to change trips from cars to other modes,

01:50:41.240 --> 01:50:43.240
 those are the areas where we have the highest potential.

01:50:43.240 --> 01:50:47.240
 And I'm looking at other, like I mentioned a little while ago at least,

01:50:47.240 --> 01:50:53.240
 I'm trying to find ways to look at those other areas outside of those three places.

01:50:53.240 --> 01:51:00.240
 The big challenge that I would suggest outside of those three key areas within the city

01:51:00.240 --> 01:51:05.240
 is just the barriers that we've got, mostly 35, which is an area we've focused on a lot

01:51:05.240 --> 01:51:11.240
 as part of our bike program work and working with Gary and Parks on trails connectivity

01:51:11.240 --> 01:51:13.240
 because 35 is a major barrier.

01:51:13.240 --> 01:51:16.240
 We've had a lot of conversations and texts out about that as well.

01:51:16.240 --> 01:51:21.240
 But I don't want to misinterpret the work that we're doing.

01:51:21.240 --> 01:51:23.240
 We're not just focused in those three areas.

01:51:23.240 --> 01:51:29.240
 Those just happen to be the areas from a pedestrian perspective that are going to drive the most trips.

01:51:29.240 --> 01:51:32.240
 Thank you.

01:51:32.240 --> 01:51:35.240
 I have some questions and comments, but I think Ed?

01:51:35.240 --> 01:51:37.240
 Yeah, just a very short observation.

01:51:37.240 --> 01:51:42.240
 This sidewalk was put in on Nauticam Drive.

01:51:42.240 --> 01:51:44.240
 That's an area where I live.

01:51:44.240 --> 01:51:55.240
 And I was pleasantly amazed at how that one strip is unified in that neighborhood

01:51:55.240 --> 01:52:03.240
 and increased socialization amongst people because we walk on that, people walk on their dogs, whatever.

01:52:03.240 --> 01:52:07.240
 I mean, it's amazing how many people are coming out now and walking.

01:52:07.240 --> 01:52:10.240
 And you meet new people, you meet neighbors you didn't know you had.

01:52:10.240 --> 01:52:18.240
 So I mean, the social aspect of sidewalks is absolutely incredible in that respect.

01:52:18.240 --> 01:52:24.240
 And I think that should be taken into consideration as well, if it isn't already.

01:52:24.240 --> 01:52:29.240
 Yeah, I tried to refer to that a little bit in how the projects will have to be delivered.

01:52:29.240 --> 01:52:34.240
 But basically, we can't just look at a project and say we're going to build all the BPI 6 and 5s.

01:52:34.240 --> 01:52:38.240
 We have to look at every investment we make from a network perspective.

01:52:38.240 --> 01:52:48.240
 So the project you're Nauticam sidewalk that you're referring to makes the connection that goes north of university, it goes up.

01:52:48.240 --> 01:52:55.240
 So having those connections fill in gaps in the sidewalk network and not stop short

01:52:55.240 --> 01:52:58.240
 so somebody can't get to where they want to go to.

01:52:58.240 --> 01:53:02.240
 I mentioned a lot of people there using the trail once they get on the sidewalk.

01:53:02.240 --> 01:53:12.240
 So it is important to acknowledge that these projects have to deliver a complete link from one sidewalk to the next.

01:53:12.240 --> 01:53:22.240
 They can't just be we extended the sidewalk a few hundred feet because they're probably not going to drive that sort of engaging socialization.

01:53:22.240 --> 01:53:26.240
 It won't have that benefit if we don't create those complete networks.

01:53:26.240 --> 01:53:29.240
 So Paul, piggybacking on that, because that's my neighborhood too.

01:53:29.240 --> 01:53:35.240
 And we worked on there was originally supposed to be two sidewalks on a north.

01:53:35.240 --> 01:53:40.240
 And then we had a community member who lives there, Brian Beck, who's now a council member, suggest,

01:53:40.240 --> 01:53:46.240
 well, why don't we divide those up, do one on Old North and one on Nottingham because we have the money for it.

01:53:46.240 --> 01:53:49.240
 But Nottingham still didn't go all the way to Windsor.

01:53:49.240 --> 01:53:52.240
 Although it was supposed to, it stopped a block short.

01:53:52.240 --> 01:53:55.240
 So there's not that connectivity to the bike lane that's on Windsor.

01:53:55.240 --> 01:54:01.240
 It just is another sidewalk we have in our community that just stops.

01:54:01.240 --> 01:54:04.240
 But that's that's another topic.

01:54:04.240 --> 01:54:07.240
 So I wanted to thank you for being here.

01:54:07.240 --> 01:54:11.240
 We were given a budget, this sustainability.

01:54:11.240 --> 01:54:17.240
 And part of that is since our transportation is the highest polluter,

01:54:17.240 --> 01:54:26.240
 some of that funding we were looking to to go into marketing to get people off, you know, out of cars and into the community on bikes and walking.

01:54:26.240 --> 01:54:32.240
 And we wanted to make sure that before we recommended that that we had a safe place to recommend that they go.

01:54:32.240 --> 01:54:37.240
 And so we wanted to come here to see I wanted you to come here to present.

01:54:37.240 --> 01:54:40.240
 So we know what's in store.

01:54:40.240 --> 01:54:46.240
 I know this is just the sidewalk part of it and not necessarily the bike lane part of it.

01:54:46.240 --> 01:54:52.240
 But that's all included and it's all important for us as we look to reduce those emissions and, you know,

01:54:52.240 --> 01:55:00.240
 make sure that people are safe and healthy as they're getting out of cars and mobility.

01:55:00.240 --> 01:55:05.240
 And part of that is, like you said, code and planning.

01:55:05.240 --> 01:55:13.240
 And I know that we have a developmental code committee that is that is meeting and they make recommendations.

01:55:13.240 --> 01:55:23.240
 Have you presented to them some of your ideas as far as what you have to to help to help with these going forward?

01:55:23.240 --> 01:55:35.240
 Like for the built community? Yeah, I would say I haven't met with code. Now, the city's code refers to the transportation criteria manual and transportation standards in our specs.

01:55:35.240 --> 01:55:46.240
 So Capital Projects has the we lead the charge on what are the standards and how how would they do the work.

01:55:46.240 --> 01:55:56.240
 Development just refers over to what we say and then requires that of the developer or anybody who's doing some kind of improvement on the street.

01:55:56.240 --> 01:56:01.240
 So like DCTA is an example, but not developers working on our streets or our utility companies.

01:56:01.240 --> 01:56:10.240
 Well, there's a city council code, development code committee that needs to talk about ways to improve our code.

01:56:10.240 --> 01:56:18.240
 And so maybe, you know, if you had some ideas for our built community. Yeah, I've not met with them. I was not even aware that was.

01:56:18.240 --> 01:56:30.240
 Well, that's that might be something because for us, as we talk about existing codes and, you know, our goal is to get people out of cars and into the community safely.

01:56:30.240 --> 01:56:41.240
 That might be just a suggestion, something that you to make me with. So is there on for the for the data?

01:56:41.240 --> 01:56:51.240
 Is there data out there for every sidewalk or every section of sidewalk built that there's a reduced emission correlated to it?

01:56:51.240 --> 01:57:06.240
 Is that possible? Probably the best data to look at in that regard is like mode share. So, you know, how many people are walking or biking and then cities or states look at that data over time.

01:57:06.240 --> 01:57:23.240
 Brad advisor actually is one of the leading researchers in bike mode share and looking at that data over time. I can't point to anything that says you build a sidewalk and it will reduce carbon emissions or increase that mode share by a significant variable.

01:57:23.240 --> 01:57:43.240
 That's usually I would say anecdotally the communities that invest in making biking and walking improvements that truly make safety enhancements. So the crosswalks example that say we're going to prioritize walking and biking and make it safe and comfortable.

01:57:43.240 --> 01:57:58.240
 Tend to increase their mode shares the most because they're they're making those significant investments and they're changing behavior. Come from Washington, D.C. They had a huge investment in biking and they now have a huge bike mode share.

01:57:58.240 --> 01:58:15.240
 It continues to increase every year and they make more investments every year. So I just see that as an outcome of the work, but it has to be sustained. It needs to be driven by all of those goals and making sure that we're not investing.

01:58:15.240 --> 01:58:29.240
 The reason I was talking about the loop a little bit and you know some of this needing to look at demand is that if we're saying we're going to be a bike friendly community and we're going to focus on doing all these things that improve biking and walking,

01:58:29.240 --> 01:58:39.240
 but we only look outside the loop in new developed areas and we're not looking inside our core is those places might be walkable, but they may not have a lot of demand to walk or bike.

01:58:39.240 --> 01:58:52.240
 So we have to make very intentional change in the character of our city in the core or we're not going to really sort of it's not a genuine investment. It's not a genuine goal.

01:58:52.240 --> 01:58:57.240
 So we have to be very intentional if we're going to make those changes.

01:58:57.240 --> 01:59:11.240
 And on on those so I saw that in your PBI one of the main thing or the first thing that came up is major streets and one thing you probably notice of being new or not all of the streets here in Denton are Denton streets.

01:59:11.240 --> 01:59:19.240
 We have a lot of textile streets and then there's some, you know, the universities who have streets, but they're still, they're not private streets.

01:59:19.240 --> 01:59:36.240
 They're Denton streets. Have you when we talk about sidewalks on those, is that a like a special relationship where you have communication with textile or is it so like when I'm thinking right now thinking of University East.

01:59:36.240 --> 01:59:52.240
 So as you're heading out, there's, you know, we talked about the people walking all the time on there. There's not sidewalks on either side. So going back in, if we were to build sidewalks there, that would be a text that issue, right?

01:59:52.240 --> 02:00:06.240
 Not a, not a city, not a city build. Is that correct? Correct. Yeah. So we've had ongoing conversations with text. They've changed their standards. Like I mentioned today they would build a side path. 15 years ago they wouldn't even build a sidewalk.

02:00:06.240 --> 02:00:20.240
 We're having those conversations with them on roads that they're turning over for city maintenance. So, yeah, there, there are a lot of mixed conditions of those facilities throughout the city and text.

02:00:20.240 --> 02:00:34.240
 There's a lot on a lot of the roadways. Loop 288 is a big one that we're actually looking to make some sidewalk investments because of the junction relocating, relocating downtown the, our daily bread, I think it is.

02:00:34.240 --> 02:00:42.240
 So, we are looking at some sidewalk investments like that, but the need is still a lot greater than, you know, what we're looking at right now.

02:00:42.240 --> 02:00:55.240
 And there are people who are walking on those major roads. That's why I made that the first point in the presentation that, you know, somebody who needs to get along university, they're not going to find a connected network that parallels university.

02:00:55.240 --> 02:01:05.240
 You can parallel portions of McKinney, but certainly those major roads are a way that people have to get around and we have to make them accessible.

02:01:05.240 --> 02:01:16.240
 Would that be like a cost sharing situation, maybe? Right now, no. If we want to make those connectivity improvements, we can pay for them.

02:01:16.240 --> 02:01:25.240
 If TxDOT has funding, then they will pay for them and we could look to do cost sharing, but I haven't seen any emphasis from TxDOT on those existing roads.

02:01:25.240 --> 02:01:29.240
 When they would come back to do something else, they would make the investment.

02:01:29.240 --> 02:01:43.240
 And then another one of your PPI calculations was safety. And I noticed that you had pedestrian crashes, but I didn't notice any bicycle crashes. Was that separate or is that still kind of included in that?

02:01:43.240 --> 02:01:59.240
 It's not included because we were specifically looking at pedestrian. I would say we didn't have a lot of bicycle crashes as opposed to there's more pedestrian crash data than there is bicycle crash data. That's a trend that's typical.

02:01:59.240 --> 02:02:13.240
 We look at bicycle crash data and I'll be looking at that as part of our bike program work. But even then, I would point out that outcome-based data, so where the crashes occurred, is just one indication of safety.

02:02:13.240 --> 02:02:21.240
 There are a lot of other ways that we can look at safety and that gets somewhat to the questions about those crosswalks.

02:02:21.240 --> 02:02:29.240
 Looking at the potential threat for somebody to have a crash or even, like I said, where the crash occurs may not be where the safety challenge is.

02:02:29.240 --> 02:02:41.240
 So sometimes you have to acknowledge that somebody took a risk away from where they perceived a threat and they got hit. So there's a lot of different ways we have to look at safety, not just the crashes.

02:02:41.240 --> 02:02:50.240
 And again, for this committee, if we're recommending people walk and bike, we want to make sure that those areas are addressed with the safety issues.

02:02:50.240 --> 02:03:10.240
 I have just a couple more. So when we, the citizens voted in a bond, there was a section of sidewalks, like a list of sidewalks. Is that what you're going off of still or have you changed any of those with the new information that you have come up with?

02:03:10.240 --> 02:03:23.240
 I can't speak robustly to the bond program and the sidewalk segments. I know a lot of the projects that you see in that project list or the map that's here has listed or discussed it.

02:03:23.240 --> 02:03:32.240
 A fair amount of those were out of the bond program list. I don't know how many, so I'd be speculating to say anything beyond that.

02:03:32.240 --> 02:03:41.240
 And on the, seeing the PPI calculation, when I saw it, it kind of reminds me of the OCI when you're talking about streets, but you're talking about sidewalks.

02:03:41.240 --> 02:03:49.240
 And I know for us as a community, we invest a lot in our streets. We look at repair and maintenance and there's a budget for that.

02:03:49.240 --> 02:04:03.240
 And I know at one time there wasn't a specific budget for sidewalks, but there needs to be one for repair and maintenance. Is that something that you have now or you're looking into?

02:04:03.240 --> 02:04:19.240
 I would say the bonds previously, the theme that I heard entering capital projects is the bonds were street bonds that didn't consider bike or pedestrian connectivity. If those elements could be addressed, they might have been like a resurfacing project might have been a bike lane.

02:04:19.240 --> 02:04:29.240
 But in general, those funds did not address other modes. That is something that needs to be reevaluated when future bonds are issued.

02:04:29.240 --> 02:04:42.240
 I've also been sure to pass along that we have a requirement, a federal requirement that as we do road improvements, we at least address that missing or non-compliant ramp issue.

02:04:42.240 --> 02:04:53.240
 So that's something that I was sure to pass along as well. We can't go in and fix the street and leave out the ramps. If we've got sidewalks, at least the ramps need to be compliant, even if what's behind it is not.

02:04:53.240 --> 02:05:00.240
 That doesn't mean we build ramps to nowhere. It just means if there's a sidewalk and the ramp is missing or not compliant, it needs to be repaired.

02:05:00.240 --> 02:05:27.240
 Last two, last two. So in there, I know that for the community and for me personally, equity is a big thing in the community and sometimes it doesn't seem like it's applied in every aspect. And so I heard you mention it just in the conversation, but I didn't see it addressed anywhere in here.

02:05:27.240 --> 02:05:47.240
 So how do you make sure that when you look at these three main areas that you talked about, that we look at providing equal equality among the neighborhoods that need it rather than the university area?

02:05:47.240 --> 02:06:04.240
 Where you may have heard me somewhat refer to equity was when I was talking about the census data, because that's where I think we'll probably see the best data to look from an equity perspective and also from a health perspective.

02:06:04.240 --> 02:06:19.240
 And the data has just not been released yet. Census hasn't published. So some census data has been published, but like overall population and those other factors that will be really beneficial in those areas have not been put out yet.

02:06:19.240 --> 02:06:34.240
 We've still been looking at equity in other aspects of our work, so you don't see it in the sidewalk plan, but it's certainly we're looking at it from other project bases, if you will.

02:06:34.240 --> 02:06:41.240
 So it's not something that's being ignored. We did hear that in some of the earlier presentations as well. It's not a point that's lost.

02:06:41.240 --> 02:06:51.240
 We're not going to make project selections based on the overall data, and there will be an equity aspect that's applied, especially as we get our hands on that data to take a look at it as well.

02:06:51.240 --> 02:07:14.240
 And one of the challenges that I, when you mentioned the universities, one of the challenges I think we'll see in the data is that university students trigger some of the metrics like low income that could potentially skew the data as well and point us towards student housing areas where folks don't have higher incomes because they're students and they don't have a job.

02:07:14.240 --> 02:07:32.240
 So I would be interested to see if the data has any of those correlations to make sure that we're not, by default, biasing our recommendations into those areas based on household incomes. We'll be looking at factors that help to avoid that sort of potential.

02:07:32.240 --> 02:08:00.240
 I'm really glad to hear that. That's really important for us here on this committee, too. Last question. I heard you talk about ADA compliance and the federal, the regulations are kind of free, but I've also heard once you start work on, say you want to fix this ramp, then it triggers something and you have to completely upgrade that whole intersection to compliance.

02:08:00.240 --> 02:08:28.240
 And so that is why, you know, you'll see more intersections not completed ADA wise. Is that a fair statement? Like, the funding has to be completely there to completely upgrade it if you're going to say, you know, if there's a hole in the ramp or something, you can't just go in and fill that hole without making everything else in compliance.

02:08:28.240 --> 02:08:40.240
 Yeah, so the Justice Department defines compliance from an ADA perspective based on the ramps. So that's why the focus on intersections and not on anything around the intersections.

02:08:40.240 --> 02:09:04.240
 So when we have a project that touches a ramp at an intersection, it triggers a requirement to make the intersection fully compliant. So like, we're working on a Sycamore Side Path project that goes from the A train station over to UNT, and that project goes through several intersections where because we touched one part of the intersection to put a trail through, we have to make the entire intersection compliant.

02:09:04.240 --> 02:09:15.240
 That's just to make sure that we're not ignoring the needs of people passing through an intersection just because our project only touched one part and not the other.

02:09:15.240 --> 02:09:36.240
 So that's where that criteria lies, and that's why we go in and resurface a road. Anything along the road at each intersection, the ramps have to be compliant. That's really the only criteria that the federal government has been very specific about. Then they give us the leeway of those other issues.

02:09:36.240 --> 02:09:59.240
 If those crossroads or point conflict or things like that are in the sidewalk, we have more flexibility to determine what are our priorities and what we need to fix along a corridor first. So we have a lot more flexibility in that regard, but the intersection is sort of the main thing that needs to be fixed from a federal standard.

02:09:59.240 --> 02:10:17.240
 And just last, I'd like your opinion because for us, this committee, as we go and we look at the funds, we want to make sure that we reduce pollution and we get cars off the road and we want to make sure that our community is safe and walkable and sustainable.

02:10:17.240 --> 02:10:39.240
 Are we, how far away do you think we are? Are we at a good point right now where we can start spending those dollars to advertise to our community and market to our community to make those trips out of your vehicle and walking and biking when we're in regards to safety?

02:10:39.240 --> 02:10:55.240
 Yeah, I'd say we have a lot of work to do in the sidewalk department. Especially, there were a lot of sidewalk deficiencies in downtown even, and that's one of our more walkable places outside of the campus, like on-campus areas.

02:10:55.240 --> 02:11:13.240
 So, and I feel like we've heard a theme that a lot of our neighborhoods don't have sidewalks in them, or there are not a lot of sidewalks in the neighborhoods. There's still a lot of work to be done to make our city more walkable, more bikeable, and that's what our team and others around the city are working on every day.

02:11:13.240 --> 02:11:30.240
 And I've heard it consistently as a priority of our current council and across the city, it's a big priority. Well, thank you, I think. Is everybody good? I have to add to the matrix, so not necessarily.

02:11:30.240 --> 02:11:43.240
 Yeah, we're going to open that back up right after this. So I just want to thank you for coming to present to us, and I appreciate all the work you're doing. We know that there's a lot. There's a lot.

02:11:43.240 --> 02:11:59.240
 Well, thank you for listening and sharing your comments. We'll go back and take a look at them and take them to heart. Rest assured, everything you said will be re-reviewed and we'll consider how we can improve this plan. We appreciate your comments. Thanks for having us here.

02:11:59.240 --> 02:12:19.240
 You're welcome back anytime. Thank you. Alright, so we will go ahead and reopen our item for the matrix because of the things that we heard today. Go ahead. Yeah, so I was the one that asked for the transportation overview, and I really appreciate the overview of the sidewalks plan.

02:12:19.240 --> 02:12:34.240
 The transportation is the kind of gorilla in the room for emissions and other things. So Nathan mentioned the new transportation standards. I'd love to hear about that. I'd love to hear about the broader mobility plan as well.

02:12:34.240 --> 02:12:51.240
 I'd like to hear more about bike lanes and the bike program because we didn't hear about that today. I'd also like to hear more about vehicle idling standards because that's a low-hanging fruit that we could actually target for reducing emissions from the transportation sector.

02:12:51.240 --> 02:13:07.240
 I'd also like to know what the plans are for slow streets. So fitting in with this presentation on sidewalks, those places where we can't put sidewalks, how do we enforce slower traffic where people have to walk on the road?

02:13:07.240 --> 02:13:30.240
 And then I had a side thought that we know that there is this new infrastructure bill that's coming out. Does the city get some of that money? I mean, do we know what the plan is for that? So that's more just kind of a question about the infrastructure bill and what we might be in store for debt and what the plan is to do with that money.

02:13:30.240 --> 02:13:47.240
 So I would like to hear more on transportation on a couple of those points because I think, as we all recognize in the climate, that is the biggest emitter and the biggest issue I think for a truly sustainable city. So I would like to hear a lot more.

02:13:47.240 --> 02:14:02.240
 So we'll just add that to the matrix of presentation, more engineering probably, just transportation overall, biking streets. And then just I think on the transportation, the question on funding may be an update.

02:14:02.240 --> 02:14:17.240
 We may want to pull somebody from development services in to talk about standards in new development. Okay. Anyone else? Matrix? We talked a little bit earlier, Ed?

02:14:17.240 --> 02:14:46.240
 Yeah, I had a thing on the TUV matrix that's been on for over a year and I'd like to put it on our matrix in hopes of bringing it to fruition. And what that request was was to know the amount of electricity generated in both residential and commercial

02:14:46.240 --> 02:15:00.240
 PV installations over a designated amount of time and the amount of that electricity that was returned to the grid.

02:15:00.240 --> 02:15:17.240
 Thank you.

02:15:17.240 --> 02:15:40.240
 I just want to reiterate, I think what I've heard different members say about all the different plans in the city. If we can have just an update on those and pull the sustainability parts out of each of those plans and make sure that they're

02:15:40.240 --> 02:15:53.240
 all correlated or that they're working together and not against each other and that there is specific sustainability parts in each of the plans going forward.

02:15:53.240 --> 02:16:10.240
 I think that was mentioned earlier, I just want to make sure that that's as an item.

02:16:10.240 --> 02:16:28.240
 And I think we will move on to concluding items, but we pretty much did that I think under the matrix. If anybody has anything at this point that they want to say, if not, we will close the meeting.

02:16:28.240 --> 02:16:32.240
 319. Thank you everyone.